CT&T Concrete
Van Engineering, Tiger Construction, Tiger CT&T Concrete Paving Paving Inc. - Line Section Description UOM QTY Van Engineering, Inc. Inc. LLC Construction, LLC Inc. - Unit Price Total OPTION A Replace Sidewalk SQFT 25000 $12.00 $300,000.00 $9.14 $228,500.00 $14.80 $370,000.00 Replace Curb and Gutter in
2 OPTION A place (18" wide gutter) LN FT 8000 $45.00 $360,000.00 $45.73 $365,840.00 $58.80 $470,400.00 Replace Curb and Gutter in
OPTION A lace (24" wide gutter LN FT 8000 $45.00 $360,000.00 $48.78 $390,240.00 $63.20 $505,600.00 eplace Standard Cross-Gutte
4 OPTION A as required SQFT 8000 $20.00 $160,000.00 $17.28 $138,240.00 $23.00 $184,000.00 Replace Driveway Approach
5 OPTIONA excluding curb & gutter SQ FT 8000 $12.00 $96,000.00 $14.17 $113,360.00 $17.00 $136,000.00 Replace Wheelchair Ramp
excluding curb & gutter (6"
6 OPTION A SQ FT 10000 $20.00 $200,000.00 $29.47 53900000- $18.00 $180,000.00 OPTION A-SUB-TOTAL $1,476,000.00 $1,846,000.00
7 OPTION B Replace Sidewalk in Place SQ FT 25000 $8.00 $200,000.00 $10.80 $270,000.00 $14.80 $370,000.00 Replace Curb and Gutter in
8 OPTION B place (18" wide gutter) LN FT 8000 $43.00 $344,000.00 $49.20 $393,600.00 $58.80 $470,400.00 Replace Curb and Gutter in
OPTION B place (24" wide gutter) LN FT 8000 $45.00 $360,000.00 $52.45 $419,600.00 $63.20 $505,600.00 Replace Standard Cross-Gutter
10 OPTION B as required SQFT 8000 $20.00 $160,000.00 $18.55 $148,400.00 $23.00 $184,000.00 Replace Driveway Approach
11 OPTION B excluding curb & gutter SQ FT 8000 $12.00 $96,000.00 $15.85 $126,800.00 $17.00 $136,000.00 Replace Wheelchair Ramp
excluding curb & gutter (6"
12 OPTION B thick) SQ FT| 10000| $27.00 $270,000.00 $32.75 $327,500.00 $18.00 $180,000.00 13 • OPTION B Replace "A" Curb LN FT | 4000 $45.00 $180,000.00 $49.20 $196,800.00 $55.00 $220,000.00 Over-Excavate, Remove and
Replace Existing Asphalt per
14 OPTION B Specs as necessary SQ. FT 1 $3,000.00 $3,000.00 $27.30 $27.30 $7.00 $7.00 Place, Grade, and Compact
Crushed Aggregate Base (CAB)
at Over-Excavated Asphalt
15 OPTION B Areas as necessary TON 1 $3,000.00 $3,000.00 $251.00 $251.00 $30.00 $30.00 Catch Basin Small-up to 8 feet-
16 OPTION B as necessary SQFT 1 $1,000.00 $1,000.00 $740.00 $740.00 $110.00 $110.00 17 OPTION B Catch Basin Large-as necessary SQFT 1 $1,000.00 $1,000.00 $740.00 $740.00 $88.00 $88.00 18 OPTION B Parkway Culvert-as necessary SQFT 1 $1,000.00 $1,000.00 $221.50 $221.50 $80.00 $80.00 OPTION B-SUB-TOTAL $1,619,000.00 $1,884,679.80 $2,066,315.00 BID TOTALS $3,095,000.00 $3,415,559.80 $3,912,315.00
IFB S-1281
On-Call Concrete
Bid Results
item 24 Award a contract to Tiger Construction LLC., for on-call concrete construction services, IFB No. S-1389. (Cost: Not to exceed $900,000/year)(Action Item)
Garden Grove City Council
June 23, 2026
- Document
- item 24 Award a contract to Tiger Construction LLC., for on-call concrete construction services, IFB No. S-1389. (Cost: Not to exceed $900,000/year)(Action Item)
- Meeting
- June 23, 2026
- Body
- Garden Grove City Council
- Original file
- 122 KB
Text extracted from the city's file for reading and search. Open the original on agendasuite.org. That file is the official record.