item 24 Award a contract to Tiger Construction LLC., for on-call concrete construction services, IFB No. S-1389. (Cost: Not to exceed $900,000/year)(Action Item)

Garden Grove City Council
June 23, 2026

Document
item 24 Award a contract to Tiger Construction LLC., for on-call concrete construction services, IFB No. S-1389. (Cost: Not to exceed $900,000/year)(Action Item)
Meeting
June 23, 2026
Body
Garden Grove City Council
Original file
122 KB
Text extracted from the city's file for reading and search. Open the original on agendasuite.org. That file is the official record.

CT&T Concrete
Van Engineering, Tiger Construction, Tiger CT&T Concrete Paving Paving Inc. - Line Section Description UOM QTY Van Engineering, Inc. Inc. LLC Construction, LLC Inc. - Unit Price Total OPTION A Replace Sidewalk SQFT 25000 $12.00 $300,000.00 $9.14 $228,500.00 $14.80 $370,000.00 Replace Curb and Gutter in
2 OPTION A place (18" wide gutter) LN FT 8000 $45.00 $360,000.00 $45.73 $365,840.00 $58.80 $470,400.00 Replace Curb and Gutter in
OPTION A lace (24" wide gutter LN FT 8000 $45.00 $360,000.00 $48.78 $390,240.00 $63.20 $505,600.00 eplace Standard Cross-Gutte
4 OPTION A as required SQFT 8000 $20.00 $160,000.00 $17.28 $138,240.00 $23.00 $184,000.00 Replace Driveway Approach
5 OPTIONA excluding curb & gutter SQ FT 8000 $12.00 $96,000.00 $14.17 $113,360.00 $17.00 $136,000.00 Replace Wheelchair Ramp
excluding curb & gutter (6"
6 OPTION A SQ FT 10000 $20.00 $200,000.00 $29.47 53900000- $18.00 $180,000.00 OPTION A-SUB-TOTAL $1,476,000.00 $1,846,000.00
7 OPTION B Replace Sidewalk in Place SQ FT 25000 $8.00 $200,000.00 $10.80 $270,000.00 $14.80 $370,000.00 Replace Curb and Gutter in
8 OPTION B place (18" wide gutter) LN FT 8000 $43.00 $344,000.00 $49.20 $393,600.00 $58.80 $470,400.00 Replace Curb and Gutter in
OPTION B place (24" wide gutter) LN FT 8000 $45.00 $360,000.00 $52.45 $419,600.00 $63.20 $505,600.00 Replace Standard Cross-Gutter
10 OPTION B as required SQFT 8000 $20.00 $160,000.00 $18.55 $148,400.00 $23.00 $184,000.00 Replace Driveway Approach
11 OPTION B excluding curb & gutter SQ FT 8000 $12.00 $96,000.00 $15.85 $126,800.00 $17.00 $136,000.00 Replace Wheelchair Ramp
excluding curb & gutter (6"
12 OPTION B thick) SQ FT| 10000| $27.00 $270,000.00 $32.75 $327,500.00 $18.00 $180,000.00 13 • OPTION B Replace "A" Curb LN FT | 4000 $45.00 $180,000.00 $49.20 $196,800.00 $55.00 $220,000.00 Over-Excavate, Remove and
Replace Existing Asphalt per
14 OPTION B Specs as necessary SQ. FT 1 $3,000.00 $3,000.00 $27.30 $27.30 $7.00 $7.00 Place, Grade, and Compact
Crushed Aggregate Base (CAB)
at Over-Excavated Asphalt
15 OPTION B Areas as necessary TON 1 $3,000.00 $3,000.00 $251.00 $251.00 $30.00 $30.00 Catch Basin Small-up to 8 feet-
16 OPTION B as necessary SQFT 1 $1,000.00 $1,000.00 $740.00 $740.00 $110.00 $110.00 17 OPTION B Catch Basin Large-as necessary SQFT 1 $1,000.00 $1,000.00 $740.00 $740.00 $88.00 $88.00 18 OPTION B Parkway Culvert-as necessary SQFT 1 $1,000.00 $1,000.00 $221.50 $221.50 $80.00 $80.00 OPTION B-SUB-TOTAL $1,619,000.00 $1,884,679.80 $2,066,315.00 BID TOTALS $3,095,000.00 $3,415,559.80 $3,912,315.00
IFB S-1281
On-Call Concrete
Bid Results