Cities Index.
Agenda packet

Gardena City Council
July 26, 2022

Document
Agenda packet
Meeting
July 26, 2022
Body
Gardena City Council
Pages
54
Original file
104.8 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

The DVR shall be capable of recording in multiple formats including JPEG and in H.264 compression with up to D1 resolution to avoid loss of detail on zoomed images. The D VR must be able to switch record rate, 135
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 compression and resolution seamlessly without loss of video during transition. System shall be capable of accepting both analog NTSC and high definition wide dynamic range IP cameras.

All image requests and subsequent downloaded files shall have the capability to be stored on a hard drive. The hard drive shall be easily removed and video files viewed at a separate location equipped with the same drive mechanism.

System Management Tool
Central Processor shall utilize G PS data to synchronize system time and tag video files with location coordinates allowing files to be searched on a geographic location basis using the System Management Tool .

Camera Surveillance System shall utilize a WLAN compatible with wireless network s in use at LACMTA divisions and shall incorporate a system management tool for; wireless download of video files in a timely manner, software upgrades, camera checks, configuration changes and health reports as required. Final configuration is subject to LACMTA approval in Pre-Production meetings.

System management tool shall be a virtual implementation and provide expansion capability including compatibility with existing video management applications at LACMTA.

In addition, System Management Tool shall:
• Be configured to run in Master-Slave mode under Virtual Box. • Provide the ability to replicate user accounts and passwords from Master to Slave. • Include provisions for future application authentication to Metro Microsoft Active Directory. • Allow user management at Master server and all Slave servers with inherent accounts from Master. • Backup the restore virtual image via the host operating system to last backup state. • Support Metro Enterprise backup and archive management tools such as IBM Tivoli. • Support use of Metro’s MS Windows 2008 R2 approval image on host servers with Metro dom ain and security policies.
• Allow NAS storage at remote sites.
• Include OS and application security and patch management process. • Be optimized for hardware utilization in shared computing resources with Orbital DIS.

Given the current Metro wireless specification, Camera Surveillance System shall be able to wirelessly download 30 minutes of video in less than 30 minutes.

WLAN shall also be capable of transmitting encrypted video images or files on a real-time basis to a laptop PC held by law enforcement personal adjacent to or behind the bus. DVR status and event data shall also be made available through J1708/1587 interfa ce to ATMS VAN. DVR shall be individually programmable to record each camera sequentially.

The system management tool for use at up to 13 LACMTA operating divisions shall be provided , subject to LACMTA approval in Pre-production meetings.

Enhanced Video Recording System Option
Pricing for optional features to enhance the video recording system shall be provided on Price Form PF-1, Schedule of Optional Vehicle Configuration. The features shall include items listed below along with any other enhancements that Contractor believes would improve functionality and ease of use for the video recording system.
• Ability of video system to analyze and discern events such as wheelchair passengers and generate report information with summary data such as wheelchair passenger count and boarding/alighting locations, subject to LACMTA approval.
• The ability to utilize the dash mounted display for diagnostic work or configuration changes on the DVR. • Incorporation of a 360 degree camera(s) for better surveillance of bus interior. 136
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 TS 86.2 Public Address System
Contractor shall install a public address (PA) system which enables the Operator to perform audible announcements. A switch shall be provided to allow the Operator to select announcements either inside, outside, or both. The location of the gooseneck microphone is subject to LACMTA approval in Pre-Production meetings.

PA Amplifier
The PA amplifier shall be supplied in the ITS compartment convenient for adjust ments (Refer to Section TS

88.1 Approved Equals ). The amplifier shall be supplied with a 12 -volt DC switched service. The amplifying system shall be balanced such that no adjustment of volume is necessary when switching from inside to outside. The system shall automatically mute when not in use.

Gooseneck Microphone
A microphone shall be mounted on a heavy -duty black anti-glare gooseneck with quick release input jack. The gooseneck microphone shall be mounted in a position to allow the operators’ to comfort ably speak without using their hands. The microphone, when deployed, shall remain stable in it s’ position and be easily adjusted by the Operator to reach approximately four inches from their mouth, in all normal seat adjustment positions. A strain relief ( p-clip or equal) shall be installed near the base as needed to prevent a gooseneck failure when the microphone is pulled to its adjustment limit. A padded bracket shall be provided to support the gooseneck when not in use.

TS 86.2.1 Speakers
Interior and exterior sp eakers shall be of sufficient capacity to ensure that they are not damaged when full amplified power is applied. Inside speakers shall broadcast, in a clear tone, announcements that are clearly perceived from all seat positions at approximately the same volume level. Speakers shall be located in the light panel/HVAC duct to deter vandalism. The speakers shall not be mounted directly on the surface of the ceiling panels. A weather -proof speaker(s) shall be provided outside the bus so that announcements can be clearly heard by passengers standing near the door equipped with the wheelchair access. Interior loudspeakers shall be installed with proper phasing. Total impedance seen at the input connecting end shall be 4 to 8 Ohms.

Mounting shall be accomplished with riv-nuts and machine screws.

Speaker wires from each individual speaker (inside and outside) shall terminate in the ITS enclosure.

TS 86.3 Automatic Passenger Counter (APC)
Provisions and necessary cables for installation of door s ensors and analyzer(s) for IRMA -Matrix with J1708 infrared APC system ; including software integration, testing, first article acceptance and any other items necessary for proper operation shall be provided, subject to LACMTA approval in Pre-Production meetings.

TS 86.4 Radio Handset and Control System
Make Ready Provisions
The Contractor shall provide “Make Ready Provisions” that will accommodate post -delivery installation of LACMTA provided equipment such as radio and future Intelligent Transportation System (ITS) equipment.

Detail design of the ITS Make Ready Provisions shall be finalized during Pre -Production meetings and Pilot Bus build. Make Ready Provisions shall be approved by the LACMTA prior to start of production. The provisions shall include specified equipment, (such as antennas and preinstalled cabling), space for LACMTA provided ITS equipment, power supply circuits, conduit system, and structural mounting provisions.

The following devices are to be included in the LACMTA’s ITS system for installation by the LACMTA after delivery of the bus:
a) Voice Radio.
b) Data Radio.
137
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 c) AVA System Processor (Part of In Vehicle Unit (IVU)). d) Automatic Passenger Counting (APC) Processor.
e) Automatic Passenger Counting (APC) Door Sensors.
f) J1708 Vehicle Area Network Controller (Part of IVU)
g) Driver Control Module (DCM).
h) Automatic Vehicle Locator (AVL) Processor (Part of IVU).

TS 86.4.1 Drivers Speaker
Not applicable.

TS 86.4.2 Handset
Contractor will supply and install a handset for driver use. (Refer to Section TS 88.1 Approved Equals).

TS 86.4.3 Driver Control Module (DCM)
Space and mounting provisions shall be provided for an ATMS Driver Control Module (DCM) (Orbital Sciences 111240-1DCM). The DCM installation provisions shall appear as an integral part of the operator area design.

The location of the DCM shall provide the Operator with a free and unobstructed view of the DCM controls/display and be within easy reach of the Operator. The DCM shall be positioned to minimize glare and maximize readability in all lighting conditions and Operator seat positions.

Provisions for the DCM shall accommodate the following specifications:

TABLE 12
DCM Specifications
Property Specification
Maximum height: 8 inches
Maximum width: 8.7 inches
Maximum depth: 3.1 inches
Housing: Splash proof and UV resistant
Shock tolerance: 18g for 3 ms
Vibration tolerance: 4g peak rms @ 5 to 150 Hz
Contractor shall install a driver display unit as close to the driver’s instrument panel as possible.

TS 86.4.4 Emergency Alarm
Contractor shall install an emergency alarm that is accessible to the driver but hidden from view. The guarded Silent Alarm System (SAS) switch shall be mounted on control panel located to the left of seated Operator, (Refer to Section TS 88.1 Approved Equals ). The four -corner clearance lamps shall flash when the SAS is activated. Two 16ga leads, (color to be determined during Pre-Production meetings), shall be wired to the normally closed SAS switch terminals and routed to the ITS Equipment enclosure. SAS switch location and lead wire routing is subject to LACMTA approval in Pre-Production meetings.

TS 86.5 ITS Provisions Power Supply
The ITS enclosure shall be provided with protected power buss circuits for the future LACMTA installed ITS equipment. These power requirements are in addition to Contractor provided equipment power requirements.

Each power buss will include mounting provisions for up to six individual manual resetting circuit breakers for branch circuits feeding equipment located within the enclosure. 138
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 TABLE 13
ITS Power Provisions
Source Volt Circuit Quantity
Through Battery
Disconnect Switch(es)
12 a) 20-amp, DC 1
24 b) 20-amp, DC 1
Gnd Return for 20 amp circuits 1
Ignition 12 a) 10-amp, DC multiplex controlled circuit. 2 24 b) 10-amp, DC multiplex controlled circuit. 2
Gnd Return for switched circuits 2
TS 86.6 ITS Provisions Conduits
A system of pre -installed “ITS conduits” will be provided to assist with future installation and replacement of wiring and cabling associated with the LACMTA’s ITS equipment listed in TS 8 6.4. ITS Conduits, in conjunction with existing bus wire ways, will be required where future LACMTA installation and replacement of cabling is not practical due to obstructions from items such as interior paneling, bus structure or other assemblies. In general, conduits exposed to the interior of the bus shall be water tight and have a minimum

1.5 inch inside diameter and be routed to permit pulling cables, includin g connectors, through the conduits using a preinstalled “pull wire”. Conduits will be terminated at the ITS enclosure using suitable reusable water tight fittings. Conduit installation shall follow best commercial practices with regard to drip loops and ro uting to avoid moisture problems.

Conduits, in conjunction with existing bus wire ways, shall permit interconnection of ITS sub -systems and devices as follows:

TABLE 14
ITS Conduits
From Termination
Antenna, Data Radio Transceiver ITS Enclosure
Antenna, GPS Receiver ITS Enclosure
Antenna, Voice Radio Transceiver ITS Enclosure
Antenna, Wireless LAN ITS Enclosure
Antenna, Two spare positions ITS Enclosure
APC Door Sensors, Front Door ITS Enclosure
APC Door Sensors, Rear Door ITS Enclosure
Engine Control Processor ITS Enclosure
Exterior Speaker ITS Enclosure
Farebox ITS Enclosure, 1” ID
Front Dash ITS Enclosure
Head sign Compartment Front Dash
Interior Information Sign, Front ITS Enclosure
Interior Information Sign, Rear ITS Enclosure
Interior Speakers ITS Enclosure
139
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Operator Control Unit, Operator Dash ITS Enclosure
PLC Compartment ITS Enclosure
Radio Control Head ITS Enclosure, 2 ¼ “ ID
Security System Processor ITS Enclosure
Transmission Control Processor ITS Enclosure
Upper Center Windshield ITS Enclosure, 1-1/2” ID
TS 86.7 Provisions, Automated Vehicle Announcement (AVA) System Structural provisions and necessary cables shall be provided in the ceiling to install two AVA signs constructed to withstand the heavy -duty environmental and service conditions found in transit operations. The front sign shall be located near the standee line. The rear double -sided sign shall be positioned adjacent to the exit door and forward of the interior steps.

Both the front and rear double-sided signs shall be installed by Contractor.

TS 86.8 ITS Provisions, Wireless Local Area Network (WLAN) WLAN antenna, including five leads; two Cellular, two Wi-Fi and one GPS and an additional Wi-Fi antenn a inside the bus for passenger. Sierra Wireless, InMotion MG90 or an approved equal wireless router/switch and feedline shall be installed, subject to LACMTA approval in Pre-Production meetings. (Refer to Section TS 88.1 Approved Equals ). Router shall include gateway activation and client license fees as well a s preferred AS, AMM with 3 -year and group 2 per gateway. Power for wireless router/switch shall be independently timed by the router to allow automatic turn -off one hour or more after bus is parked as a configurable feature of the router.

TS 86.9 ITS Provisions, Radio Antennas
Provide two Antenna Specialists (508 MHz and 900 MHz) radio antennas for voice and data radios. The antennas should have a feedline of RG -142 signal loss and physical quality specifications or better. The antennas shall be attached to the roof wit h antenna leads routed through 3/4 -inch inside diameter conduits to the ITS enclosure. Antenna leads shall be type RG142 coaxial cable connected at the antenna by a soldered type N connector and 90 -degree type N adapter with a minimum four-inch service loo p. A type N soldered connector and a RG142 reducer shall be supplied for the radio connections in the ITS enclosure. The antenna mounting and lead termination shall be accessible from the Bus interior, subject to LACMTA approval in Pre- Production meetings. Antennas shall not be painted. (Refer to Section TS 88.1 Approved Equals).

TS 86.10 ITS Provisions, Global Positioning System (GPS) A Global Positioning Satellite (GPS) Antenna and feedline shall be provided. The GPS Antenna shall be mounted on the centerline of the roof of the bus near the front , with a quick connector, within two feet from the antenna, for future replacement, subject to LACMTA approval in Pre-Production meetings. Refer to Section TS

88.1 Approved Equals.

TS 86.11 ITS Provisions, Incident Based Surveillance System (IBSS) Complete mounting provisions, modules and necessary cables for the most current LACMTA IBSS, (SmartDrive), shall be provided running from the center windshield area to the ITS enclosure, permitting installation of EDR and completion of s ystem by the bus manufacturer. All modules including SmartDrive SR3 for EDR shall be supplied by Contractor through existing SmartDrive Contract for installation by Bus manufacturer. Battery and ignition power and a separate J1939 communication connection shall be supplied in the ITS enclosure, subject to LACMTA approval in Pre-Production meetings. 140
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 TS 87. Event Data Recorder (EDR)
EDR shall be installed on the bus. The unit shall be installed as low as possible. The EDR shall be able to communicate over the Jl939 CAN line and shall be equipped with three -axis accelerometer. The system shall be capable of recording available fault codes including DM1 messages. Settings are to be finalized with the LACMTA during Pre-Production. The EDR shall broadcast via the Jl939 data communication link severe impact events to the vehicle monitoring system and also trigger an event in the camera system. The EDR shall also tag an event from a signal received over the Jl939 CAN line from the silent alarm switch signal and the camera event button and in turn broadcast these events to the vehicle monitoring system. The EDR shall also record the following operational data:
• Head lights on or off.
• Turn signals and hazard lights on or off.
• Ignition on or off.
• Low air pressure warning.
• Whether moving in forward or reverse or idling.
• Parking brake is on or off.
• Retarder switch on or off
TS 88. Appendix
TS 88.1 Approved Equals
The following table lists products which have been approved for the bus procurement. The list only contains products which are of interest to the LACMTA and is not intended to be a comprehensive listing of every product which is required for the manufacture of the subject buses. Product categories not listed are left to the discretion of the Contractor so long as the product complies with the specifications. Product specification information is for reference only and may not reflect the latest or future improvements by manufacturers. Any change, revision, or substitution of specified products requires approval of the LACMTA. To add to or revise this list, Contractor must submit a written request per the Specification by the due date found in the RFP for approved equals.

TABLE 15
Approved Products

PRODUCT MANUFACTURER PRODUCT SPECIFICATION

Air Coupling AMFLO CP1, CP2, C1, C2
Air Coupling Tru Flate 12-124, 13-124, 12-134, 13-134
Air Coupling Parker 2C, 3C, B12, B13
Amplifier, PA Motorola Solutions Inc. 120039-2
Antenna, Data Radio Antenna Specialty Co. ASPRC-572MOT, 508 MHz Antenna, GPS ACS Transport 120076-4
Antenna, Voice Radio Antenna Specialty Co. ASPG931MOT, 900 MHz Antenna, WLAN Mobile Mark RM3-2400
Drain Plug, Dry Brake FEMCO As needed
Farebox – Reference only GFI Odyssey C24003-0501FB
Farebox Baseplate GFI Odyssey D22581-0003
Fluid, Rear Axle Full Synthetic
Fluid, Transmission Full Synthetic
Fuel Receptacle, fast fill OPW CL50
141
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18

PRODUCT MANUFACTURER PRODUCT SPECIFICATION
Fuel Receptacle, slow fill OPW LB36
Jumper Receptacle-24 Volt Whitaker 3298
Microphone REI
Radio Handset Motorola P/N12004-8
Registration Holder Truck-Lite 97960
Seat Insert Fabric Holdsworth Sunrise/Sunset
Seat Insert Fabric LaFranch King’s Plus
Fabric
Sunrise/Sunset
Seat Insert Fabric Blue
Silent Alarm Switch Microswitch Part No. 4TL 1-3 with spring loaded black Take-One Box Beemak Plastic BP-750-CT
Minimum Take-Twelve Box Transit Information
Products
407160
Trip Recorder (Replaces Hubodometer) FleetWatch JX55
Wireless Router (Wi-Fi System) Sierra Wireless InMotion, MG90 Wireless Router AMM Sierra Wireless 9010230
Wireless Router Gateway activation Sierra Wireless IMTSER524 Wireless Router Client License Sierra Wireless 9010208
TS 88.2 Maintainability Requirements
Mean Time to Fix
Maintenance requirements stated in mean time to fix (MTTF) are established below in Table 16. Unless otherwise indicated, these figures represent the total elapsed labor time (hours/minutes) required to complete the maintenance task by one mechanic. The fi gures do not include time required to prepare the bus such as bringing the bus to the hoist, raising it, etc.

The Contractor shall be required to demonstrate these maintenance tasks using the information as contained in the Service and Parts manuals. The demonstrations shall be conducted on the Pilot Bus and may occur at LACMTA facilities. Should a failure of a demonstration occur, the Manufacturer m ay be required to modify its bus design or service manual information as necessary and re -demonstrate the procedure on the Pilot Bus.

The purpose of these demonstrations is to validate the maintenance manual, speci al tool requirements, and MTTF.

TABLE 16
MTTF

SERVICE TASK MTTF
(hrs./min.)
INSPECTION:
6,000 Mile Inspection 7.5 hr.

Daily Inspections 10 min.

Brake Inspection 15 min.

REMOVE AND REPLACE:

A/C Blower Motor 1 hr.

A/C Condenser Motor 1 hr.
142
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18

SERVICE TASK MTTF
(hrs./min.)
Alternator 2 hr.

Access for Door Motor Adjustment < 2 min.

Air Compressor 2 hr.

Air Dryer Desiccant 15 min.

Batteries Set 45 min.

Brake Application Valve 1 hr.

Engine/Transmission PPA (2 mechanics) 6 hr.

Engine ECM 2 hr.

Exterior Mirror Glass < 5 min.

Headlining Panels, Interior individual (less handrails) < 30 min.

Power Steering Gear Box Assembly 2 hr.

PPA mounts, complete set 2 hr.

Radiator ( 2 mechanics) 3 hr.

Seat Insert < 1 min.

Shocks, Each 45 min.

Starter 1.5 hr
Transmission unit 8 hr.

Wheel Change, Front 45 min.

Wheel Change, Rear Dual 60 min.

Window glazing, Passenger 60 min.

Window guard, Passenger and Door 6 min.

Wiper Motor 20 min.

Operators Seat 30 min.

Electronic Unit (Regulator, PLC Module, Relay, Fuse, etc.) 15 min.

Lamps, Passenger Lights 15 min.

Mean Miles Between Failures
Table 17 lists minimum design goals for mean miles between failures (MMBF) on critical areas of bus.

TABLE 17
MMBF Goals
Type Description Design Goal
Class 1: Physical Safety
Mean distance greater than 1,000,000
miles
Class 2: Road Call Mean distance greater than 10,000 miles Class 2:

Stalling
Mean distance greater than 50,000 miles
Interlock, F/R Doors
No Start

SEL/CEL
Diagnostic Light
143
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Electrical failure
Stalling
Low Air
Suspension
HVAC
Charging System
Pneumatic System
Class 2:

ADA- Ramp,
Securement Mean distance greater than 75,000 miles
TS 88.3 Technical Contract Deliverables
Contractor shall provide a table of contract deliverables, documentation and/or demonstrations as scheduled in the Contract documents during the proposal period . See Table 20 attachment for reference on technical submittal items.

Test Procedures
Contractor shall submit an overall test procedure for each design qualification and conformance /acceptance testing for approval to LACMTA at least 30 days prior to the sch eduled date of the test. The Contractor shall provide all equipment and instrumentation required to conduct the tests. Along with the title referencing the specification requirement, the test procedure shall include at a minimum the following:
• Test objective
• Description of the type of report to be submitted
• Success/failure criteria
• Sequence of testing
• Equipment/instrumentation list with calibration dates • Description of test setup including necessary diagrams • Test methodology
• Procedure for data evaluation
The report shall be submitted within 30 days after completion of testing and shall follow industry standard format for submittal of technical papers. The reports shall include analysis along with necessary; photographs, charts and measured/accumulated data to support conclusions. Reports shall include a statement certifying compliance to specification requirements along with a list of any deficiencies.

TS 88.4 Decals/Signs
TABLE 18a
Exterior – Metro Local (Poppy)

DRAWING
REFERENCE QTY DESCRIPTION CS CATALOG # DIMENSION
A 3 Vehicle ID_4.5” White CS0130 N/A
B 1 CNG Large_7.75” CS0140 1-11/16” x 7-
3/4”
C 1 SHUT OFF VALVE_1”(H) CS0144 N/A
D 2 Battery Disconnect CS55486 6-1/2” x 6-1/2”
E 4 Jack Points_3.75”(H) CS5489 2” x 3-3/4”
F 2 Metro Local_7”(H) CS0204 N/A
144
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18

DRAWING
REFERENCE QTY DESCRIPTION CS CATALOG # DIMENSION
G 2 Nation’s Largest Clean-Air Fleet_ 3.5” (H) CS0131 N/A H 2 Metro_17. 5”(H) CS0185 N/A
I 2 Local_16.25”(H) CS0196 N/A
J 2 CA LICENSE ID_1.5”(H) CS0129 N/A
K 2 Metro Local_5.5” (H) CS0202 N/A
L 1 Circle M_7.5”(H) CS0133 N/A
M 1 Welcome Aboard_1”,3/4”(H)
Bienvenidos
Exact Fare Please
Tenga Pasaje Exacto Per Favor
CS0127 N/A
N 3 323.GO.METRO_7/8”(H)
metro.net_11/16”(H)
CS0148 N/A
O 1 American Flag_Boarding CS0125 6-3/4” x 3-1/2”
P 1 ISA Wheelchair CS1000 6” x 6”
Q 1 ADA Kneeling Bus CS0143 5-1/2” x 7”
R 2 Local_12”(H) CS0198 N/A
S 1 Metro Local_1.5”(H) CS0135 N/A
T 2 Circle M_4.5”(H) CS0132 4-1/2” Dia.

U 1 Vehicle ID_2.625”(H)_White CS0351 N/A
V 1 American Flag_Driver CS0126 6-3/4” x 3-1/2”
W 1 Circle M_10”(H) CS0134 10” Dia.

X 1 Danger-Do Not Turn In Front Of Bus_8.5”(H) CS0146 N/A Y 1 CNG Small_4”(H) CS0141 6-1/2” x 4”
TABLE 18b
Exterior - Metro Rapid (Red)

DRAWING
REFERENCE QTY DESCRIPTION CS CATALOG # DIMENSION
A 3 Vehicle ID_4.5” White CS0130 N/A
B 1 CNG Large_7.75” CS0140 1-11/16” x 7-
3/4”
C 1 SHUT OFF VALVE_1”(H) CS0144 N/A
D 1 Battery Disconnect CS55486 6-1/2” x 6-1/2”
E 4 Jack Points_3.75”(H) CS5489 2” x 3-3/4”
F 2 Metro Rapid_7”(H) CS0210 N/A
G 2 Nation’s Largest Clean-Air Fleet_ 3.5” (H) CS0131 N/A H 2 Metro_17.5”(H) CS0185 N/A
I 2 Rapid_16.25”(H) CS0197 N/A
J 2 CA LICENSE ID_1.5”(H) CS0129 N/A
K 2 Metro Rapid_5.5” (H) CS0208 N/A
145
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18

DRAWING
REFERENCE QTY DESCRIPTION CS CATALOG # DIMENSION
L 1 Circle M_7.5”(H) CS0133 N/A
M 1 Welcome Aboard_1”,3/4”(H)
Bienvenidos
Exact Fare Please
Tenga Pasaje Exacto Per Favor
CS0127 N/A
N 3 323.GO.METRO_7/8”(H)
metro.net_11/16”(H)
CS0148 N/A
O 1 American Flag Boarding CS0125 6-3/4” x 3-1/2”
P 1 ISA Wheelchair CS1000 6” x 6”
Q 1 ADA Kneeling Bus CS0143 5-1/2” x 7”
R 2 Rapid_12”(H) CS0199 N/A
S 1 Metro Rapid_1.5”(H) CS0157 N/A
T 2 Circle M_4.5”(H) CS0132 4-1/2” Dia.

U 1 Vehicle ID_2.625”(H)_White CS0351 N/A
V 1 American Flag Driver CS0126 6-3/4” x 3-1/2”
W 1 Circle M_10”(H) CS0134 10” Dia.

X 1 Danger-Do Not Turn In Front Of Bus_8.5”(H) CS0146 N/A Y 1 CNG Small_4”(H) CS0141 6-1/2” x 4”
TABLE 19a
Interior – Metro All

DRAWING
REFERENCE QTY DESCRIPTION CS CATALOG # DIMENSION
A 4 Security Camera in Operation CS5382 1’-0”x3-1/4”
B 2 Reserved for Seniors CS5382 1’-7”x4”
C 3 Reserved for Mobility Devices CS5401 1’-7”x4”
D 2 Please Remain in Securement CS0230 10”x5-1/4”
E 3 Watch Your Step CS5421 1’-4-1/4”x3”
F 1 Bus Maximum Height CS0234 4-1/4”x2-1/8”
G 1 Bus Drivers Carry No Cash CS5508 1’-1/4”x4-1/4”
H 1 PC640 CS5814 1’-4-3/4”x4-1/4”
I 1 Unnecessary Conversation CS0155 4-1/4”x4-1/4”
J 1 Financial Responsibility CS0162 3-3/4”x3-3/4”
K 1 Welcome to Metro CS0152 5/8”x3-1/2”
L 1 Exit Rear Door CS5505 11”x3-1/4”
M 1 Reserved for Mobility Devices CS5505 11”x3-1/4”
N 2 Caution Door Opens Automatically CS5511 3-3/8”x7”
TABLE 19b
High Voltage – Metro ZE Bus
146
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Note: Table 19b applies to zero emission bus decals. Location and quantity of these decals will vary depending on the individual bus configuration. Final layout will be determined during Pre-Production meetings.

Area Description Size -
Inches
Location Qty Total

1. Lock Out Compartment

4 x 6 Inside the compartment -
Next to the switch
1 AR

4 x 6 Inside the compartment -
Next to the switch
1 AR

2. Battery Compartment(s)

6 x 4 Inside the compartment -
On the battery box
1 AR

4 x 6 Inside the compartment -
On the battery box
1 AR
XXX VOLTS 1 x 4 Inside the compartment -
On the battery box
1 AR

2 x 3 On the battery enclosure
door, visible from outside
1 AR

3. Automatic Start Equipment

2 x 4 On the equipment 1 AR

2 x 4 On the compressor 1 AR
XXX VOLTS AC 3 PHASE 1 x 6 On the equipment and
control boxes
1 AR
XXX VOLTS 1 x 4 On the equipment and
control boxes
1 AR

4. Auxiliary Motor Controller(s)
XXX VOLTS AC 3 PHASE 1 x 6 On the control box(es)
and motor(s)
1 AR

5. PPU and Hazardous Voltage
Area(s)
2 x 3 On the enclosure door,
visible from outside
1 AR

6 x 4 On the enclosure door,
visible from inside
1 AR
XXX VOLTS 1 x 4 Inside the compartment 1 AR

4 x 6 On the enclosure door,
visible from inside
1 AR

147
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Area Description Size -
Inches
Location Qty Total

6. Charging Connector
(Bus Side)
2 x 3 On the enclosure door,
visible from inside
1 AR

7. Charging Connector (Station
Side)
2 x 3 Next to each charging
connector
1 AR
TS 88.5 References
SAE # Title Date
Published
J10 Air Brake Reservoir Performance and Identification Requirements. Dec 04, 2013 J211 Instrumentation for Impact Test—Part 2: Photographic Instrumentation June 16, 2014 J287 Driver Hand Control Reach March 11, 2016
J366 Exterior Sound Level for Heavy Trucks and Buses Sept 12, 2011 J381 Windshield Defrosting Systems Test Procedure and Performance Requirements - Trucks, Buses, and Multipurpose Vehicles.

Jan 27, 2009
J534 Lubrication Fittings Aug 11, 2015
J537 Storage Batteries May 23, 2011
J541 Voltage Drop for Starting Motor Circuits July 16, 2013 J587 License Plate Illumination Devices (Rear Registration Plate Illumination Devices) Aug 21, 2012 J593 Backup Lamps (Reversing Lamps) Aug 26, 2010
J673 Automotive Safety Glasses July 6, 2015
J680 Location and Operation of Instruments and Controls in Motor Truck Cabs, Recommended Practice
Sep 1, 1988
J686 Motor Vehicle License Plates Aug 7, 2012
J689 Curbstone Clearance, Approach, Departure, and Ramp Break over Angles—Passenger Car and Light Truck
Aug 26, 2009
J726 Air Cleaner Test Code June 27, 2002
J833 Human Physical Dimensions May 29, 2003
J844 Nonmetallic Air Brake System Tubing Dec 19, 2012
J941 Motor Vehicle Drivers’ Eye Locations Mar 3, 2010
J994 Alarm—Backup—Electric Laboratory Performance Testing Sept 17, 2014 J1050 Describing and Measuring the Driver's Field of View Feb 13, 2009 J1113 Electromagnetic Compatibility Component Test Procedure Part 42, Conducted Transient Emissions
Dec 8, 2010
J1127 Low Voltage Battery Cable Dec 3, 2015
J1128 Low Voltage Primary Cable Dec 3, 2015
J1149 Metallic Air Brake System Tubing and Pipe Oct 21, 2015 J1211 Handbook for Robustness Validation of Automotive Electronic Modules Nov 19, 2012 J1292 Automobile and Motor Bus Wiring Jan 1, 2008
J1308 Fan Guard for Off-Road Machines Dec 17, 2013
J1455 Recommended Environmental Practices for Electronic Equipment Design in Heavy-Duty Vehicle Applications
Aug 24, 2012
J1587 Electronic Data Interchange Between Microcomputer Systems in Heavy-Duty Vehicle Applications, Recommended Practice
Jan 4, 2013
J1708 Serial Data Communications Between Microcomputer Systems in Heavy-Duty Vehicle Applications
Dec 12, 2010
J1908 Electrical Grounding Practice Jan 1, 1996
J1986 Balance Weight and Rim Flange Design Specifications, Test Procedures, and Performance Recommendations
March 18, 2016

148
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 J1939 Data Link Layer March 3, 2016
J1995 Engine Power Test Code - Spark Ignition and Compression Ignition - Gross Power Rating, Standard;
Jan 10, 2014
J2249 Wheelchair Tiedown and Occupant Restraint Systems for Use in Motor Vehicles Jan 29, 1999 J2402 Road Vehicles—Symbols for Controls, Indicators, and Tell-tales Jan 7, 2010 J2711 Recommended Practice for Measuring Fuel Economy and Emissions of Hybrid-Electric and Conventional Heavy-Duty Vehicles
Sept 20, 2002
J2805 Measurement of Noise Emitted by Accelerating Road Vehicle Nov 10, 2015 J2808 Lane Departure Warning Systems Minimum Performance Requirements March 9, 2015

TS 88.6 Holders

FIGURE 9
Bad Order (B.O.) Card Holder

FIGURE 10
Typical Trash Bag Hooks
149
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18

150
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 FIGURE 11
Metro Tow Device

151
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Technical Contract Deliverables
Contractor shall provide a table of contract deliverables, documentation, samples and/or demonstrations as scheduled in the Contract documents.

Table 20, provided as reference for Technical submittal items, is representative and not intended to be all inclusive.

TABLE 20
Contract Deliverable Items
Item Section Title Deliverable Schedule Requirement
1 TS 4 Legal Requirements Certification Pre-production Meetings
The Contractor shall comply with all applicable federal, state and local regulations. These shall include but not be limited to ADA, as well as state and local accessibility, safety and security requirements. Local regulations are defined as those below the state level.
2 TS 5 Overall Requirements Documentation
With Pilot Bus
and First Article
Bus
Contractor and LACMTA shall identify subcomponent vendors that shall submit installation/application approval documents , (including necessary documents and/or diagrams to verify configuration),with the completion of a Pilot Bus and First Article Bus.
3 3 TS 5.4 Maintenance and
Inspection Documents Proposal Period
Contractor shall provide a list of all special tools and pricing required for maintaining this equipment. Said list shall be submitted as a supplement to Form PF-3 Schedule B of Prices Special Tools.
4 4 TS 5.6 Training Documents Proposal Period
The Contractor shall provide pricing for up to 1,000 Instructor class-room hours with the Bus order. For each Option order, Contractor shall also be required to provide Instructor training.

The quantity of training hours shall be determined by the quantity of Option Buses ordered and shall be equal to five hours of training per Option bus up to a maximum of 500 instructor class-room hours for each Option order.
5 5 TS 5.6 Training, Base Order
Buses Documentation 30 days after pilot
bus delivery
The LACMTA shall approve the proposed trainers and their qualifications, proposed subjects and scheduling of the classes conducted by the Contractor at the time of pilot bus review. 6 TS 5.6 Training, Option Order
Buses Documentation
30 days prior to
delivery of Option
pilot bus
The LACMTA shall approve the proposed trainers and their qualifications, proposed subjects and scheduling of the classes conducted by the Contractor.
7 6 TS 5.6.1 Training Curriculum Documents
30 days prior to
delivery of pilot
bus
The Contractor shall develop and submit a training curriculum using the most current version Microsoft Office Word and/or Power Point, subject to LACMTA approval.
152
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
8 7 TS 5.6.2 Teaching Materials Documents,
materials
30 days prior to
training
The Contractor shall provide to the LACMTA Maintenance
Instruction Department visual and other teaching materials as needed during classroom instruction.
9 8 TS 5.6.3 Optional Training Aids Documents Proposal Period The Contractor shall supply pricing for items a – k, special training aids, as listed below for use by LACMTA training staff.

Pricing for these aids is to be provided to the LACMTA on Form PF-5-Schedule D of Prices Training Aids.
10 TS 5.6.3
Optional Training Aids, E-
Learning/Interactive
Training Media
Documents Proposal Period
The Contractor shall provide pricing for 25 hours of
CNG/Electric Bus interactive learning seat time on Form PF-5- Schedule D of Prices Training Aids. The media shall provide a high level of student interactivity, including but not limited to:
questions review, component identification, tool use, circuit building, component testing.

All content shall be navigated through an industry standard e- learning programs graphical user interface (GUI) subject to LACMTA approval.
11 TS 5.6.4 Manuals, Manual Review
and Approval Documents After NTP
The Contractor will be required to participate in Manual Review and Approval process and attend one service manual review meeting held at the LACMTA shortly following LACMTA Notice to Proceed.
12 9 TS 5.6.4
Manuals, Draft Manuals,
Manual Review and
Approval
Documents With pilot bus
The Contractor shall provide the LACMTA with:

Ten draft hardcopies each of the Service, Parts and Operator’s manuals plus a list of all proposed OEM Component Repair manuals, simultaneously to the shipping of the first Pilot Bus. 13 TS 5.6.4 Manuals, Draft Manuals,
Parts Index
Hardcopy,
Spreadsheet
60 days prior to
production 60
A part number index shall be submitted for review at least 60 days prior to the scheduled ship date of the first production Bus.
14 1
0 TS 5.6.4 Manuals, Final Manuals Documents 90 days after start of production
Ten final hardcopy sets of Service and Parts manuals, shall be provided for each 100 Buses and twelve 12 total sets of Subsystem OEM manuals.
15 TS 5.6.4 Manuals, Final Manuals Documents 90 days after start of production
Contractor shall supply a listing of diagnostic codes with final service manuals delivered that covers trouble shooting fault trees/codes related to the PPU.
16 1
1 TS 5.6.4 Manuals, Final Manuals Documents 90 days after start of production
Final DVD editions of Service, Parts and Operator’s manuals must be delivered within 90 days after the start date for production Buses.
153
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
17 1
5 TS 5.6.4 Manuals, Component
Repair/Service Section Documents 90 days after start
of production
Fourteen sets of Repair Manuals necessary to rebuild all Contractor supplied Units including: PPU, transmission/electric drive, HVAC system, starter, alternator, air compressor, etc., shall be provided.
18 TS 5.6.4 Manuals, Component
Repair/Service Section Hardware 90 days after start
of production
Each set shall be organized and mounted onto a suitable table top holding rack subject to LACMTA approval
19 1
6 TS 5.6.4 Manuals, Price List Hardcopy,
Spreadsheet
90 days after start
of production and
updated annually
Ten copies of the current price list shall be provided separately as a supplement to the final parts manuals. Price lists shall be updated at least annually and provided for the life of the Bus as they are updated.
20 5.6.5
Special Equipment,
Option, Special Service
Equipment
Documents Proposal Period
The LACMTA is aware that diagnostic equipment and/or
software has been developed or is being developed by many of the OEMs to assist in the maintenance of the Buses.

Proposer is required to submit a list of recommended special equipment, software and/or diagnostic tools deemed
necessary to provide state-of-the-art service for the bus systems. Depending on the type of available equipment and/or software, the LACMTA may wish to obtain complete sets of such Special Service Equipment and/or software, plus any additional tools identified by the OEM manufacturer required to diagnose, calibrate, or remove-and-replace, all equipment provided with this Bus order.
21 TS 5.6.6 Diagnostic Laptop PC
Specifications Laptops Delivery of first
production bus
Because of the time delay between the procurement process and receipt of computer equipment, the final laptop computer configuration shall be subject to approval by the LACMTA at delivery…
22 1
7 TS 5.6.8 In-Process and As-Built
Drawings Scale Drawings 30 days prior to
production
The Contractor shall, no later than 30 days prior to
commencing production, supply the LACMTA with two sets of harcopy scale drawings suitable for conducting repairs on every area of the vehicle, including all major systems and sub- system installations. Electrical and air schematics shall also be provided. In addition, the Contractor shall provide a description of the electronic configuration, layout and functionality of the Bus including communication paths and power distribution. 23 1
8 TS 5.6.8 In-Process and As-Built
Drawings Scale Drawings 60 days after final
bus delivery
Five sets of Conforming drawings shall be delivered to the LACMTA within 60 days after final Bus delivery.
154
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
24 TS 5.7 Operating Environment Test
Documentation
Pre-Production
Meetings
The bus shall achieve normal operation in ambient
temperature ranges of 0º F to 120º F, at relative humidity between 5 percent and 100 percent, and at altitudes up to 3,000 feet above sea level. Degradation of performance due to atmospheric conditions shall be minimized at temperatures below 0 °F, above 120° F or at altitudes above 3,000 feet. 25 1
9 TS 5.8 Noise Demonstration Pilot Vehicle at
Factory
The Contractor shall be required to demonstrate that vehicle- generated sound levels do not exceed the maximum interior and exterior values.
26 2
0 TS 5.8.1 Interior Noise Test
Documentation
Pilot Vehicle Prior
to Production
The Contractor shall provide test documentation that vehicle has sufficient sound insulation to achieve 65 dBA or lower at any point inside the bus with an 80 dBA sound source at outside skin of the bus.
27 2
2 TS 5.9 Fire Safety Certification Pre-Production
Meetings
Contractor must provide required certificates of compliance prior to manufacture of the Pilot Bus.
28 TS 5.10 Fire Suppression Documentation Proposal Period The AFSS system shall meet or exceed the environmental requirements of SAE J1211.
29 TS 5.10 Fire Suppression Documents Proposal Period
At a minimum, the engine compartment, HVAC compartment, exhaust area and high current electrical areas (except the battery compartment) at rear of bus shall be equipped with an automatic fire sensing and suppression (AFSS) system
product, subject to LACMTA approval during proposal period. 30 TS 5.10 Fire Suppression, AFSS
Monitor Panel Documenst Pre-Production
Meetings
The system shall have a supervision monitoring panel located above the operators’ side console subject to LACMTA
approval…
31 TS 5.10 Fire Suppression System,
AFSS Agent Documentation Pre-Production
Meetings
The agent shall be approved by Underwriters Laboratory or Factory Mutual Research Corporation and have no ozone
depleting property and no global warming potential per USA EPA guidelines.
32 TS 5.10 Fire Suppression System
(AFSS Cylinders) Documentation Pre-Production
Meetings
The AFSS agent cylinders shall use DOT shippable linear actuators or electric solenoid valves (squibs are prohibited) attached to DOT certified bottles which do not require
hydrostatic retest for a minimum of twelve (12) years.

Cylinder(s) shall be compatible with suppression agents. Each cylinder shall have a pressure gauge with easy to read "Go- NoGo" type indicator which is visible when the cylinder(s) is installed on the Bus.
155
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
33 TS 5.11 Gas Detection System
(GDS) Documents Proposal Period
GDS system shall be provided to monitor the engine
compartment and each separate fuel storage area(s) and shall automatically activate…
34 TS 5.11
Gas Detection System
(GDS), GDS Monitor
Panel
Documents Pre-production
Meetings
The system shall have a supervision monitoring panel located above the operators’ side console area subject to LACMTA approval
35 2
3 TS 5.13 Water Leak Testing Test All buses
The roof, windows, windshields, and all doors of all Vehicles shall be water tested for a minimum of 30 continuous minutes in order that leaks may be detected and corrected. The HVAC shall be turned on only for the first 15 minutes of the test. 36 2
4 TS 5.14 Fasteners and
Securements
Documentation,
Samples Proposal Period
Supports for all electrical cables, harnesses and bundles will be subject to LACMTA approval and shall be of premium
quality.
37 2
5 TS 6 Physical Size Test
Documentation
Pilot Vehicle at
Factory
Vehicles furnished under these specifications shall comply with physical size.
38 TS 7. Vehicle Performance,
Power Requirements Documentation Proposal Period
The propulsion system shall be sized to provide sufficient power to enable the bus to meet the defined acceleration, top speed, and gradability requirements, and operate all
propulsion-driven accessories using actual road test or dynamometer results and computerized vehicle performance data.
39 2
6 TS 7 Vehicle Performance Demonstration Pilot Vehicle at Factory
The Contractor shall be required to demonstrate acceleration, top speed, and gradeability requirements.
40 2
8 TS 7.4.3 Operating Range, CNG Documentation Proposal Period The Contractor shall provide sufficient fuel capacity to give the bus a 400 mile range before the low fuel warning light comes on.

The Contractor shall provide the LACMTA with a technical analysis which supports the proposed CNG fuel system design compliance to the LACMTA’s range of operation requirement including the proposed fuel capacity.
41 TS 7.4.4 Operation Range, Electric
(Zero Emission) Documenation Proposal Period
The Contractor shall provide sufficient energy storage and changer charging systems to give the bus a cumulative 300 mile daily operating range before the low energy warning light comes on.

The Contractor shall provide the LACMTA with a technical analysis which supports the proposed energy storage and charger systems design compliance to the MTA’s range of operation requirement including the proposed energy storage system capacity.
156
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
42 2
9 TS 9. Engine Meeting and
Documentation
Pre-production
Meetings
Prior to manufacturing the Pilot bus, the Contractor shall coordinate a technical review with the LACMTA and engine and transmission suppliers covering integration and installation design. As part of the technical review, the Contractor shall advise the LACMTA concerning engine and transmission
features and control system options, and accessories, and shall conform, to the degree possible, to those already in use at the LACMTA in an effort to increase component and system commonality.
43 TS 9 Engine Certificate Prior to start of
production
Prior to start of production, the Contractor shall provide documentation from the Subsuppliers, which supports their approval, that the engine and transmission installation, support system design, and components used specifically for the LACMTA’s contract meet the OEM requirements and
recommendations.
44 3
0 TS 9.1 Engine (CNG Documentation Pre-production
Meetings
Oil filtration systems shall be approved by the engine and transmission OEM and be designed with by-pass circuits, as needed, in the event that a filter becomes plugged.
45 TS 9.1.1
Engine, Compartment
Control Panel Gauges
and Indicators
Documents Proposal Period
The following mechanical, electrical dial gauges, or digital display, subject to LACMTA approval during proposal period, shall be mounted on, or adjacent to, the engine compartment control panel:
 Oil Pressure Gauge,
 Temperature Gauge,
 Air Filter Restriction Gauge,
 Voltage Gauge(s).
46 TS 9.2.2 Propulsion System
Service
Documents,
Drawings Proposal Period
The propulsion system shall be arranged so that accessibility for all routine maintenance is ensured. No special tools, other than dollies and hoists, shall be required to remove the propulsion system or any subsystems.
47 TS 9.2.4
Energy Storage,
Controller and Charging
Systems
Documents,
Drawings Proposal Period Energy storage shall be of a commercial design capable of operating in the LACMTA transit environment.
48 TS 9.2.5
Electric System Controller
(ESC), Primary Power
Unit (PPU)
Documents,
Drawings Proposal Period
The PPU shall have on -board diagnostic capabilities, able to monitor vital functions, store out -of-parameter conditions in memory, and communicate faults and vital conditions to
service personnel. Diagnostic reader device connector ports, suitably protected against dirt and moisture, shall be provided in operator’s area and inside PPU compartment.
157
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
49 3
5 TS 10. Cooling Systems Test or
Certification
Pre-Production
Meetings
The cooling systems shall be of sufficient size and designed to maintain fluids and engine intake air at safe, continuous operating temperatures during the most severe operations possible with the bus loaded to GVWR and with conditions as listed in Section TS 5.7 with a 10 percent minimum reserve capacity in accordance with engine and transmission
manufacturer’s cooling system requirements. The cooling system fan controls should sense the temperatur es of the operating fluids and the intake air, and if either is above safe operating conditions the cooling fan should be engaged. The fan control system shall be designed with a fail -safe mode of “fan on.” The cooling system shall provide functional servi ce while operating in the design operating profile environment.

50 TS 10 Cooling Systems Demonstration Pilot Vehicle
Delivery in LA
The cooling system shall be self purging requiring no special procedures to remove air from the system when coolant is installed or added.
51 TS 10.1 Engine Cooling Documents Pre-Production
Meetings
Surge tank filler cap shall have a safety lock. A 1/4 inch NPT port shall be provided in a convenient location in the surge tank for the LACMTA's pressure testing equipment, subject to LACMTA approval..
52 TS 12 Retarder (Transit Bus),
Retarder Disable Switch
Documents,
Drawings
Pre-Production
Meetings
The retarder disable switch shall be located behind the destination sign door, subject to LACMTA approval
53 TS 14.1 Service Documents,
Drawings Proposal Period
No special tools, other than dollies and hoists, shall be required to remove the PPA/PPU Two LACMTA mechanics
shall be able to remove, replace, and prepare the complete PPA/PPU assembly for service within a MTTF of 12-man
hours.
54 TS 14.1 Service Approval
Within 60 days
after final bus
delivery
The Contractor shall provide two suitable PPA/PPU dollies for each spare PPA/PPU purchased under this Contract.
55 TS 14.1 Service Documents.

Drawings
Pre-production
Meetings
The PPA/PPU dollies shall be designed, subject to LACMTA approval in pre-production meetings…
56 3
6 TS 14.1 Service Drawings Last Vehicle
Delivery
The Contractor shall provide the LACMTA with sufficient fabrication drawings needed to manufacture additional dollies. 57 TS 14.1 Service Documents,
Drawings
Pre-production
Meetings
Belt drives that require manual tensioning shall be designed to facilitate easy service/maintenance, subject to LACMTA
approval
158
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
58 3
7 TS 14.1 Service Certificate Pre-production
Meetings
Accessory drive belts shall be guarded in accordance with CAL OSHA article 45, Belt and Pulley Drives, Section 4070
"Guarding".
59 TS 14.1 Service, Engine Air
Cleaner Drawings Proposal Period The air filter shall be positioned for easy access and service, subject to LACMTA approval…
60 TS 15 Hydraulic Systems Demonstration Pilot Vehicle at Factory
Any hydraulically driven system shall be subject to LACMTA approval at the Pilot Bus.
61 TS 15 Hydraulic Systems Demonstration Pilot Vehicle at Factory
The hydraulic system (steering) shall be located to
accommodate easy service. The hydraulic system filter shall be located in the return, low pressure, circuit to the oil reservoir, or internal to the oil reservoir, subject to LACMTA approval at the Pilot Bus.
62 TS 15.1 Fluid Lines Documents,
Drawings
Pre-production
Meetings
Rigid and flexible lines shall be individually supported and readily accessible for inspection and service, including interior lines inside the bus,…
63 3
9 TS 18.1.2 Fuel Lines, CNG Documentation Pre-production Meetings
Fuel lines shall comply with NFPA-52. All tubing shall be a minimum of seamless Type 304 stainless steel (ASTM A269 or equivalent).

Fuel lines shall be identifiable as fuel lines only. Fuel lines shall be bent using computer numeric machines (CNC) to assure consistency, no hand bending will be permitted.

The bus manufacturer shall have a documented procedure for testing the high pressure line assembly
64 TS 18.1.2 Fuel Lines, CNG Documentation Pre-production Meetings
Hose support in-between the bus frame and the engine that exceed 12 inches is subject to LACMTA approval…
65 4
0 TS 18.2.2
Design and Construction,
CNG, Fuel
Containers/Cylinders
Documentation Pre-production
Meetings
Fuel cylinder construction shall be in accordance with DOT Standard 304, ANSI NGV2, latest revision, design and test criteria. Cylinder shall be designed for the lightest weight possible which does not require a hydrostatic re-qualification.

Cylinders shall be certified for refueling pressures to 125 percent of working pressure during temperature compensated fueling.
66 TS 18.2.2
Design and Construction,
CNG, Pressure Relief
Devices (PRDs)
Documents,
Drawings Proposal Period
PRDs shall be vented to the roof area of the Bus with minimum protrusion above the roof line and shall be protected with a suitable cap which shall withstand daily bus wash activity, subject to LACMTA approval…
159
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
67 TS 18.2.2 Design and Construction,
CNG, Valves
Documents,
Drawings Proposal Period
An additional minimum 1/2 inch valve shall be provided for draining the high pressure manifold and any fuel cylinder(s) through a service port. Type and location of the service port shall be subject to LACMTA approval…
68 4
1 TS 18.2.2 Design and Construction,
CNG, Gauges Documentation Pre-production
Meetings
Glycerin filled gauges which meet NFPA 52 requirements shall be located in the high and low pressure manifolds which shall indicate fuel system pressure.
69 TS 18.2.2 Design and Construction,
CNG, Fuel Filler
Documents,
Drawings Proposal Period The fuel filler shall be located 30 to 38 feet measure behind the centerline of the front door, subject to LACMTA approval… 70 TS 18.2.2 Design and Construction,
CNG, Defueling System
Documents,
Drawings Proposal Period The CNG defueling port shall be an NGV-3.1/CGA-12.3 certified receptacle subject to LACMTA approval…
71 4
2 TS 21 Altoona Testing Documentation Proposal or First Article Bus
A report clearly describing and explaining the failures and corrective actions taken to ensure any and all such failures will not occur shall be submitted to the LACMTA.
72 4
3 TS 23.2 Crashworthiness, (Transit
Bus) Certification Pre-Award Audit
Contractor shall be required to provide FEA software analysis or other evidence of compliance with this section during the Pre-Award Audit.
73 4
4 TS 24. Corrosion Certification Pre-production
Meetings
Representative samples of all materials and connections shall withstand a two-week (336-hour) salt spray test in accordance with ASTM Procedure B-117 with no structural detrimental effects to normally visible surfaces and no weight loss of over 1 percent.
74 4
5 TS 24. Corrosion Documentation Pre-production
Meetings
The Contractor shall provide a copy of its proposed
undercoating system program…
75 4
7 TS 25. Towing Demonstration Pilot Vehicle
Delivery in LA
Contractor shall provide fifteen (15) sets of any special towing equipment adapters, if required, so that the LACMTA is able to flat tow the Bus.
76 TS 25 Towing Demonstration Pilot Vehicle
Delivery in LA
Contractor shall demonstrate compliance with these provisions using the Pilot Vehicle.
77 TS 25 Towing Documents,
Samples
Pre-production
Meetings
All male fittings shall have an additional quarter turn manual shut off valve provided near the front bumper for use only during towing, subject to LACMTA approval
78 TS 25. Towing Demonstration Pilot Vehicle
Delivery in LA
Two rear recovery devices/tie downs shall permit lifting and towing of the bus for a short distance, such as in cases of an emergency, to allow access to provisions for front towing of bus.
79 4
8 TS 26. Jacking Demonstration Pilot Vehicle
Delivery in LA
Jacking and changing any one tire/wheel assembly shall be completed by one LACMTA mechanic.
160
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
80 4
9 TS 27. Hoisting Demonstration Pilot Vehicle
Delivery in LA
The Contractor may be required to demonstrate compatibility with LACMTA hoists as part of the towing demonstration... 81 TS 27 Hoisting Samples Pre-production
Meetings
A model or sample jacking plate shall be provided during Pre- Production meetings for approval by LACMTA.
82 TS 28.1 Floor, Design (Transit
Bus)
Documents,
Drawings Proposal Period Floor installation, repair, and replacement method shall be subject to LACMTA approval…
83 5
0 TS 28.5 Floor, Construction Documentation Proposal Period The floor shall be constructed using composite flooring material approved by the LACMTA during proposal period. 84 TS 29.3 Farebox, Stanchions Documents,
Drawings Proposal Period Stanchions shall be located around the farebox in accordance with ADA requirements and subject to LACMTA approval…
85 5
1 TS 30.1 Wheel Housing, Design &
Construction
Certification
Documentation
Pre-production
Meetings
Wheel housings shall be constructed of corrosion-resistant and fire-resistant material. Sufficient clearance and air circulation shall be provided around the tires, wheels and brakes to prevent overheating when the bus is operated in revenue service.

Wheel housings, as installed and trimmed, shall
withstand impacts of a two - inch steel ball with at least 200 foot-pounds of energy without penetration.
86 5
2 TS 31.3.3 Suspension, Lubrication,
Standard Grease Fittings Demonstration Pilot Vehicle at Factory
All elements of steering, suspension and drive systems
requiring scheduled lubrication shall be provided with grease fittings conforming to SAE Standard J534 (Zerk Fitting). 87 5
3 TS 31.3.4
Suspension, Springs and
Shock Absorbers,
Kneeling
Demonstration Pilot Vehicle at
Factory
A kneeling system shall lower the entrance(s) of the bus a minimum of 2.75 in. during loading or unloading operations regardless of load up to GVWR, measured at the longitudinal centerline of the entrance door(s) by the driver.

The bus shall kneel at a maximum rate of 1.25 inches per second at essentially a constant rate reaching fully kneeled position within 4.5 seconds. After kneeling, the bus shall rise within 3 seconds to a height permitting the bus to resume service and shall rise to the correct operating height within 7 seconds regardless of load up to GVWR. During the lowering and raising operation, the maximum vertical acceleration shall not exceed 0.2g, and the jerk shall not exceed 0.3g/second. 161
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
88 5
4 TS 31.3.4 Suspension, Springs and
Shock Absorbers, Raising Demonstration Pilot Vehicle at Factory
The Bus shall incorporate a system controlled by the operator that permits the Bus to raise ( to account for high curbs) 2.75 inches, measured from normal ride height at the center of the bottom front step regardless of passenger load up to GVWR.

The Bus shall raise at a maximum rate of 1.25 inches per second at essentially a constant rate reaching fully raised position within 4.5 seconds. After rising the Bus shall recover (lower) within 3.5 seconds to a ride height permitting the Bus to resume service and shall fully recover to the correct operating ride height within 10 seconds. During the lowering operation, the maximum acceleration shall not exceed 0.2g and the jerk shall not exceed 0.3g/sec. measured on the front door step tread.
89 5
5 TS 32.2 Tires Documentation With Each
Vehicle
Contractor shall provide the LACMTA with a record listing tires installed for each Bus delivered. The information shall include the LACMTA brand serial number and mounting location on the Bus. Contractor shall conform to tire manufacturer
specifications for maximum road speed and duty cycle during Bus delivery.
90 5
6 TS 33. Steering
Test
Documentation,
or Demonstration
Pilot Vehicle at
Factory
Electrically driven hydraulic assisted, or electrically assisted steering shall be provided. The steering gear shall be an integral type with the number and length of flexible lines minimized or eliminated. Steering torque applied by the operator shall not exceed 10 foot-pounds with the front wheels straight ahead. Steering torque may increase to 70 foot- pounds when the wheels are approaching the steering stops.

Steering effort shall be measured with the Bus at Seated Load Weight (SLW), stopped with the brakes released and the
engine at normal idling speed on clean, dry, level, commercial asphalt pavement with the tires inflated to recommended pressure. Power steering failure shall not result in loss of steering control. While the Bus is in operation, the steering effort shall not exceed 55 pounds at the steering wheel rim and perceived free play in the steering system shall not materially increase as a result of power assist failure. Gearing shall require no more than seven turns of the steering wheel
lock-to-lock.
162
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
91 5
7 TS 33.3.3 Steering Wheel, Steering
Column Tilt Demonstration Pilot Vehicle at
Factory
Steering column shall be a tilt and telescopic model.

The steering column shall have full tilt capability with an adjustment range of no less than 35 degrees and be easily adjustable by the driver.

The mechanism for adjustments shall be designed for ease of use, durability, utilize detents to position and lock the steering column and not require tightening by hand to apply a clamping force.
92 5
8 TS 33.3.4 Steering Wheel
Telescopic Adjustment Demonstration Pilot Vehicle at
Factory
The steering wheel shall have full telescoping capability and have a minimum telescopic range of 2 inches but no more than 5 inches and a minimum low-end adjustment of 32 in.,
measured from the top of the steering wheel rim in the
horizontal position, (zero degrees’ slope), to the cab floor at the heel point.
93 5
9 TS 37.1 Service Brake Certification, Test
Documentation
Pre-Production
Meetings
The entire service brake system, including ABS controls, friction material, shall meet applicable FMVSS standards. The entire brake system, including friction material, shall have overhaul or replacement life goal of at least 45,000 miles when operated under LACMTA service. Brakes shall be self-
adjusting. Mechanical brake wear indicators, (visible brake sensors), shall utilize stainless steel exposed push rods. 94 TS 37.6 Parking/Emergency
Brake, Air Brakes
Documents,
Drawings
Pre-Poduction
Meetings
The parking brake shall be actuated by a valve mounted
convenient to the operator, subject to LACMTA approval… 95 TS 39.1 Pneumatic System,
General
Documents,
Samples
Pre-Production
Meetings
A quarter turn manual shut-off valve with quick disconnect fitting shall be easily accessible and located in the engine compartment and shall supply air prior to the air dryer, subject to LACMTA approval…
96 6
0 TS 39.2 Pnuematic System, Air
Compressor Demonstration Pilot Vehicle at
Factory
The electrically-driven air compressor shall be sized
(designed) to charge the entire air system on new buses from 0 psi to 120 psi in less than five minutes for a single unit and bus not exceeding the fast idle speed (~1000 rpm) setting of the engine.
163
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
97 6
1 TS 39.2 Pnuematic System, Air
Compressor Documention Pilot Vehicle Prior
To Production
The electrically-driven air compressor shall be designed to supply air operating under the Air System Design Operating Profile while remaining within the manufactures air compressor specifications. The discharge temperature (measured at the compressor outlet using a probe thermocouple) shall not exceed 360ºF, excluding temperature spikes of durations less than two seconds and two percent of compressor charge time.

Air compressor duty-cycle shall not exceed 30 percent in any 10 minute period under the Manhattan Operating Profile. 98 6
2 TS 39.4 Pneumatic System, Air
Reservoirs Documentation
Pre-proPuction
Meetings & Pilot
Vehicle at Factory
All air reservoirs shall meet the requirements of FMVSS Standard 121 and SAE Standard J10 and shall be equipped with drain plugs and guarded or flush type drain valves below floor level. Major structural members shall protect these valves and any automatic moisture ejector valves from road hazards.

Reservoirs shall be sloped toward the drain valve. All air reservoirs shall have drain valves mounted below floor level with lines routed to eliminate the possibility of water traps and/or freezing in the drain line. All air tanks shall have check valves at the inlet side for isolation.
99 6
3 TS 40
Electrical, Electronic and
Data Communications,
Overview
Approval Prior to Pilot Bus
completion
The Contractor shall coordinate a technical review with the LACMTA covering control system integration, installation, and design. As part of the technical review, the Contractor shall advise the LACMTA concerning control system features,
options, and accessories, and shall conform, to the degree possible, to those already in use at the LACMTA in an effort to increase component and system commonality. The Contractor shall provide documentation including a description of control system operation and system schematics.
100 6
4 TS 40
Electrical, Electronic and
Data Communications,
Overview
Deliverable Pilot Vehicle at
Factory
A listing of the software part number and revision number and procedure for obtaining new releases shall be identified for each component which is software controlled.
101 TS 40.1
Electrical, Electronic and
Data Communications,
Modular Design
Demonstration Pilot Vehicle at
Factory
Replacement of the engine/propulsion compartment wiring harness(es) shall not require pulling wires through any bulkhead or removing any terminals from the wires.
102 6
5 TS 41 Environmental and
Mounting Requirements
Test
Documentation
Pilot Vehicle Prior
To Production
The electrical system and its electronic components shall be capable of operating in the area of the vehicle in which they will be installed, as recommended in SAE J1455.
164
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
103 6
6 TS 41 Environmental and
Mounting Requirements Certification Pilot Vehicle Prior To Production
No vehicle component shall generate, or be affected by, electromagnetic interference or radio frequency interference (EMI/RFI) that can disturb the performance of
electrical/electronic equipment as defined in SAE J1113 and UNECE Council Directive 95/54 (R 10).
104 TS 42.1.1
General Electrical
Requirements, Low
Voltage Batteries (24V)
Documents Proposal Period
Batteries shall be a minimum of four absorbed glass mat thin plate pure lead technology group 31 series, heavy-duty, lead- acid, sealed top battery units for: a) engine starting (including fuel controls, electronic control units and ignition system), and b) other bus loads as needed, subject to LACMTA approval… 105 TS 42.1.1
General Electrical
Requirements, Low-
Voltage Batteries
Demonstration
Test
Pilot Vehicle Prior
To Production
Starting with a full charge, starting batteries shall have sufficient energy to provide adequate power after a minimum of five continuous days (Master Run switch “Off”, Master Battery switch “On”, all lights off, LACMTA installed ITS equipment operating) without charging or engine operation to then properly start the bus.
106 TS 42.1.3 General Electrical
Requirements, Jump Start
Documents,
Samples
Pre-Production
Meetings
Female receptacles equipped with approximately one-foot 2/0 pigtail cables shall be provided.

The receptacle(s) shall be located on the curbside rear corner of the Bus for convenient jumper cable connection, subject to LACMTA approval…
107 6
7 TS 42.1.7
General Electrical
Requirements, Low-
Voltage Generation and
Distribution
Documentation Pre-Production
Meetings
The Contractor shall estimate the parasitic loads during the initial stage of the bus design and shall submit a draft report to LACMTA at the Pre-Production meetings.
108 TS 42.1.7
General Electrical
Requirements, Low-
Voltage Generation and
Distribution
Documentation Pilot Vehicle Prior
To Production
The Contractor shall estimate the parasitic loads during the initial stage of the bus design and shall submit a draft report to LACMTA at the Pre-Production meetings. A final report shall be submitted during the Pilot Bus configuration audit.
109 6
8 TS 42.4
General Electrical
Requirements, Electrical
Components
Certification Pre-Production
Meetings
Location of electronic modules shall be reviewed for
environmental suitability such as heat, water, vibrations, contamination from dust and debris, and other electrical equipment. The system including modules, external wire, connectors, and data Bus wiring shall be designed to operate under LACMTA’s Design Operating Profile. All electrical components including relays and circuit breakers must remain unaffected while bus is operated in up to 15 inches of standing water.
165
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
110 6
9 TS 43.1.3
General Electronic
Requirements,
Communications
Documents,
Drawings Proposal Period
Mounting and electrical provisions shall be provided to allow LACMTA installation of existing Fleetwatch JX-55 Vehicle Interface Module in the Operator’s area, subject to LACMTA approval…
111 TS 45.2.1
Data Communications,
Diagnostics, Fault
Detection and Data
Access
Documents,
Drawings
Pre-Production
Meetings
The communication port(s) shall be located in the Operator’s area, Engine Compartment Control Panel, and ITS Enclosure area, subject to LACMTA approval…
112 TS 45.3.1 Multiplex Level, Data
Access
Documents,
Drawings
Pre-Production
Meetings
Diagnostic and status information shall be made available via a communication port on the multiplex system. The location of the communication port shall be easily accessible inside or adjacent to the ITS Enclosure subject to LACMTA approval… 113 7
0 TS 46.1 Driver’s Area Controls,
General Documentation Pre-Production
Meetings
Switches and controls shall be divided into basic groups and assigned to specific areas, (Refer to Table 9) in conformance with SAE Recommended Practice J680, Revised 1988,
“Location and Operation of Instruments and Controls in Motor Truck Cabs,” and be essentially within the hand reach
envelope described in SAE Recommended Practice J287,
“Driver Hand Control Reach.
114 7
1 TS 46.2 Driver’s Area Controls,
Glare Inspection Pilot Vehicle at
Factory
The driver’s work area shall be designed to minimize glare to the extent possible. Objects within and adjacent to this area shall be matte black or dark gray in color wherever possible to reduce the reflection of light onto the windshield. The use of polished metal and light-colored surfaces within and adjacent to the driver’s area shall be avoided.
115 TS 46.8
Driver Foot Switches,
Solid state Foot Switch
Control
Documents,
Drawings
Pre-Production
Meetings
The inclined mounting surface shall be skid-resistant. All other controls, including high beam shall be in a location approved… 116 TS 47.1 Driver’s Amenities, Coat
Hanger
Documents,
Samples
Pre-Production
Meetings
A stainless steel, aluminum, or approved equal, coat hook shall be furnished and installed, subject to LACMTA approval. 117 TS 47.4 Repair Card Holder Documents,
Drawings
Pre-Production
Meetings
A card holder shall be provided in the operators’ area at a location accessible to mechanics standing in the front entry area with the passenger door open, subject to LACMTA
approval…
166
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
118 TS 47.5 Safety Equipment Documents,
Drawings
Pre-Production
Meetings
The following items shall be provided and installed within seven feet of the Operator’s seat in a location that is easy reach, subject to LACMTA approval…
a) DOT approved heavy-duty emergency reflector kit
stored in a storage box.
b) 5-pound (5 lb.) multipurpose fire extinguisher
mounted with universal bracket.
119 TS 47.6 Bus Registration Holders Documents,
Drawings
Pre-Production
Meetings
A Bus registration holder shall be installed above the operator near the ceiling, subject to LACMTA approval…
120 TS 47.7 Trash Hooks Demonstration Pilot Vehicle at Factory
Placement and selection of the hooks shall be reviewed on the Pilot Bus and are subject to LACMTA approval.
121 7
2 TS 49.1 Driver’s Seat, Dimensions Certification Pre-pPoduction Meetings
The driver’s seat shall be comfortable and adjustable so that people ranging in size from a 95th-percentile male to a 5th- percentile female may operate the bus. The heavy-duty
Operator's seat shall support Operators’ in the orthopedically correct seating position.
122 TS 49.8.1 Exterior Mirrors Documents,
Drawings Proposal Period Mirrors shall be made of tempered plate glass or have safety backing to prevent shattering subject to approval…
123 TS 49.8.1 Exterior Mirrors Documents,
Drawings Proposal Period
Adjustment of the mirrors shall be provided by two nubbin switches located to the left of the Operator, subject to LACMTA approval…
124 TS 49.8.1 Exterior Mirrors, Street
Side Mirrors
Documents,
Drawings Proposal Period
Street side mirror shall be overhead mounted in a position to minimize potential contact with vehicles or cyclists, subject to LACMTA approval…
125 TS 49.8.2 Interior Mirrors Documents,
Drawings
Pre-Production
Meetings
Mirrors shall be provided to permit the operator to observe passengers throughout the Bus, including entrances and exits, and directly in front of the bus during bicycle loading and unloading activities without leaving his seat and without shoulder movement, subject to LACMTA approval…
167
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
126 7
3 TS 51. Windshield Certification Pre-Production
Meetings
The windshield shall permit an operator’s field of view as referenced in SAE Recommended Practice J1050. The
vertically upward view shall be a minimum of 15 degrees, measured above the horizontal and excluding any shaded
band. The vertically downward view shall permit detection of an object 3.5 feet high no more than two) feet in front of the bus. The horizontal view shall be a minimum of 90 degrees above the line of sight. Any binocular obscuration due to a center divider may be ignored when determining the 90-degree requirement, provided that the divider does not exceed a three- - degree angle in the operator’s field of view. Windshield pillars shall not exceed 10 degrees of binocular obscuration.
127 7
4 TS 51. Windshield Inspection
Prior to Pilot
Vehicle
Acceptance
The windshield shall be designed and installed to minimize external glare as well as reflections from inside the bus.

Windshield shall be two-piece design
128 7
5 TS 52. Driver's Side Window Certification Pre-production Meetings
The driver’s side window glazing material shall have a ¼ in. nominal thickness laminated safety glass conforming with the requirements of ANSI Z26.1-1996 Test Grouping 2 and the Recommended Practices defined in SAE J673. Light
transmittance shall be maximum 75 percent on the glass area below 53 in. from the operator platform floor. On the top fixed over bottom slider configuration, the top fixed area above 53 inches may have a maximum one percent light transmittance. 129 TS 53.3 Side Windows,
Configuration
Documents,
Drawings Proposal Period
Rearmost windows which are lower than shoulder height for seated passengers shall not be opened or equipped with
emergency escape provisions, subject to LACMTA approval… 130 7
6 TS 53.4
Side Windows, Materials,
Safety Glass Glazing
Panels
Certification Pre-production
Meetings
Side windows glazing material shall have a minimum of 3/16 in. nominal thickness tempered safety glass. The material shall conform to the requirements of ANSI Z26.1-1996 Test
Grouping 2 and the Recommended Practices defined in SAE J673. Windows on the bus sides and in the rear door shall be grey tint (13-50 percent) luminous transmittance as measured by ASTM D-1003), complementary to the bus exterior. The maximum solar energy transmittance shall not exceed 37
percent, as measured by ASTM E-424.
168
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
131 TS 53.4
Side Windows, Materials,
Anti-Vandalism Sacrificial
Film
Certification Proposal Period
All glazing material that is aft of the front standee line, and in front of the exit door, shall be equipped with an interior single layer 6 mil minimum laminated film. All glazing material that is aft of, and including, the exit door shall be equipped with an interior four layer laminated film. Both types of window film installations are subject to LACMTA approval…
132 7
7 TS 54 HVAC, Capacity and
Performance
Test
Documentation
Prior to Pilot
Vehicle
Acceptance
The HVAC climate control system shall be modular design and capable of controlling the temperature and maintaining the humidity levels of the interior of the bus as defined in the following paragraphs.

With the bus running at the design operating profile with corresponding door opening cycle, and carrying a number of passengers equal to 150 percent of the seated load, the HVAC system shall control the average passenger compartment
temperature within a range between 65 º and 80°F, while maintaining the relative humidity to a value of 50 percent or less. The system shall maintain these conditions while
subjected to any outside ambient temperatures within a range of 10 º to 95 °F and at any ambient relative humidity levels between 5 and 50 percent.

System capacity testing, including pull-down/warm-up,
stabilization and profile, shall be conducted in accordance to the APTA’s “Recommended Instrumentation and Performance Testing for Transit Bus Air Conditioning System.
133 7
8 TS 56.2 HVAC, Driver's Area Test
Documentation
Prior to Pilot
Vehicle
Acceptance
The windshield defroster unit shall meet the requirements of SAE Recommended Practice J381, “Windshield Defrosting
Systems Performance Requirements,” and shall have the
capability of diverting heated air to the driver’s feet and legs.

The defroster or interior climate control system shall maintain visibility through the driver’s side window.
134 TS 56.3 HVAC, Controls for the
Climate Control System
Documents,
Drawings Proposal Period
Heater water control valves shall be “positive” type, when closed. The method of operating remote valves shall be
subject to LACMTA approval…
135 7
9 TS 57 HVAC, Air Filtration Certification Pre-production Meetings
Air shall be filtered before discharge into the passenger compartment. The filter shall meet the ANSI/ASHRAE 52.2 requirement for 5 percent or better atmospheric dust spot efficiency, 50 percent weight arrestance, and a minimum dust holding capacity of 120 g per 1000 cfm cell. Air filters shall be easily removable for service.
169
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
136 TS 62.3 Design, Curb Feelers Sample Upon Request Curb feeler sample shall be provided to Contractor upon request.
137 TS 62.3 Design, Curb Feelers Demonstration Pilot Vehicle at Factory
Installation of curb feeler shall be subject to LACMTA
approval…
138 TS 66 License Plate Provisions Documents,
Drawings
Pre-production
Meetings
These provisions shall direct-mount or recess the license plates so that they can be cleaned by automatic bus-washing equipment without being caught by the brushes, subject to LACMTA approval…
139 TS 69.1
Service Compartments &
Access Doors, Access
Doors
Documents,
Drawings
Pre-production
Meetings
The fuel fill/charge port door shall be hinged at the top and shall open fully up against the side of the Bus subject to LACMTA approval…
140 8
0 TS 70.2 Bumpers, Front Bumper Certification Pre-production Meetings
No part of the bus, including the bumper, shall be damaged as a result of a five (5) mph impact of the bus at curb weight with a fixed, flat barrier perpendicular to the bus’s longitudinal centerline. The bumper shall return to its pre-impact shape within ten minutes of the impact. The bumper shall protect the bus from damage as a result of 6.5 mph impacts at any point by the common carriage with contoured impact surface defined in Figure 2 of FMVSS 310 loaded to 4,000 lbs parallel to the longitudinal centerline of the bus. It shall protect the bus from damage as a result of 5.5 mph impacts into the corners at a 30-degree angle to the longitudinal centerline of the bus. 141 TS 70.3 Bumpers, Rear Bumper Certification Pre-Production Meetings
No part of the bus, including the bumper, shall be damaged as a result of a two mph impact with a fixed, flat barrier perpendicular to the longitudinal centerline of the bus. The bumper shall return to its pre-impact shape within ten minutes of the impact. When using a yard tug with a smooth, flat plate bumper two feet wide contacting the horizontal centerline of the rear bumper, the bumper shall provide protection at speeds up to five mph, over pavement discontinuities up to one inch high, and at accelerations up to two mph/sec. The rear bumper shall protect the bus, when impacted anywhere along its width by the common carriage with contoured impact surface defined in Figure 2 of FMVSS 301 loaded to 4000 lbs, at four mph parallel to or up to a 30-degree angle to, the longitudinal centerline of the bus.
142 TS 70.5 Bicycle Rack Documents,
Drawings
Pre-Production
Meetings
The installed bicycle rack shall not interfere with towing the Bus. California Code Title 13 requires that bike racks be installed with a way for the Operator to determine whenever the bike rack is deployed.
170
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
143 8
1 TS 71.1 Finish and Color,
Appearance Documentation
Pre-production
Meetings/Pilot
Vehicle
Contractor shall utilize the LACMTA's existing local color scheme in its exterior paint design, (see Technical
Specification Attachment 1-Metro Local Exterior and Interior Fleet Standards for reference). Exterior colors shall be applied over a white base color. The manufacturer shall submit for MTA's approval, a drawing showing painting layout including striping bends and breaks, during Pre-Production meetings.

The Pilot Bus shall be painted according to this color scheme for approval by the LACMTA prior to application to the
remainder of the buses..
144 8
2 TS 71.1 Finish and Color,
Appearance Documentation With Each
Vehicle
Exterior painted surfaces shall have a minimum of 0.5-mil thick primer coat and a minimum 2.5-mil thick finish coat. Mil thickness shall conform to paint manufacturer's specifications. 145 TS 72.1
Decals, Numbering and
Signing, Passenger
Information
Documents,
Drawings
Pre-production
Meetings
“Take One” boxes shall be mounted at both the front and rear doors in convenient locations for passengers and the minimum “Take Twelve” unit shall be located in a convenient location towards the front of the bus, subject to LACMTA approval... 146 8
4 TS 73.2 Exterior Lighting,
Doorway Lighting
Test
Documentation
Pilot Vehicle Prior
to Production
Lamps at the front and rear passenger doorways shall comply with ADA requirements and shall activate only when the doors open. These lamps shall illuminate the street surface to a level of no less than one foot-candle for a distance of threefeet outward from the outboard edge of the door threshold with a passenger standing in the threshold. The lights must be positioned overhead and shall be shielded to protect
passengers’ eyes from glare.
147 TS 73.4 Exterior, Lighting,
Headlights
Documents,
Drawings Proposal Period
Lenses shall be resistant to hazing and yellowing, and have proper hardness to resist surface scratches and stone chips, subject to LACMTA approval…
148 TS 74
Interior Panels &
Finishes, General
Requirements
Documents,
Drawings Proposal Period Additional anti-graffiti/vandalism treatments shall be applied to interior surfaces, subject to LACMTA approval…
149 8
5 TS 75. Interior Panels Certification Preproduction
Meetings
Interior panel required to meet FMVSS 302.

Materials shall comply with the Recommended Fire Safety Practices defined in FTA Docket 90-A, most recent revision. 150 TS 75 Interior Panels Documents,
Drawings Proposal Period
Panels in other areas of the bus shall be stainless or other material as determined to best match appearance with the rear section of the bus subject to LACMTA approval…
151 TS 75.2 Interior Panels, Modesty
Panel Certification Pilot Vehicle Prior
To Production
The modesty panel and its mounting shall withstand a static force of 250 lbs applied to a four inch × four inch area in the center of the panel without permanent visible deformation. 171
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
152 TS 75.2 Interior Panels, Modesty
Panel Inspection Pilot Vehicle at
Factory
At the rear door area a clear non-glass panel from above the modesty panel to the top of the daylight opening and attached to the stanchion.
153 8
6 TS 75.4 Interior Panels, Rear
Bulkhead
Documents,
Drawings Proposal Period
Ceiling and enclosures adjacent to ceiling shall be made of durable, corrosion resistant, easily cleanable material subject to LACMTA approval…
154 8
9 TS 75.8 Interior Panels, Floor
Covering Certification
Preproduction
Meetings & Pilot
Vehicle at Factory
All interior floor areas shall be covered with a combination of gray color smooth and ribbed slip resistant rubber or
equivalent floor covering that remains effective in all weather conditions with 12-year unconditional warranty, subject to LACMTA approval.
155 TS 75.8 Interior Panels, Floor
Covering
Documents,
Drawings Proposal Period
The edge of any interior steps shall have minimal overhang.

Special coating for the step tread section may be acceptable subject to LACMTA approval…
156 TS 75.9 Interior Panels, Interior
Lighting
Documents,
Drawings Proposal Period
The lighting system shall meet FCC Part 18; Class A
regulation for EMI conducted and radiated emissions.

The interior lighting design shall be subject to LACMTA approval.
157 9
0 TS 75.12 Interior Panels, Seating
Area(s) (Transit Bus)
Test
Documentation
Pilot Vehicle Prior
to Production
The interior lighting system shall provide a minimum 15 foot- candle illumination on a one square- foot plane at an angle of 45 degrees from horizontal, centered 33 inches above the floor and 24 inches in front of the seat back at each seat position.

Allowable average light level for the rear bench seats shall be seven foot-candles.
158 9
1 TS 75.14
Interior Panels,
Vestibules/Doors (Transit
Bus)
Test
Documentation
Pilot Vehicle Prior
to Production
Floor surface in the aisles shall be a minimum of 10 foot- candles, and the vestibule area a minimum of four foot-candles with the front doors open and a minimum of two foot-candles with the front doors closed. The front entrance area and curb lights (if needed) shall illuminate when the front door is open and master run switch is in the “lights” positions. Rear exit area and curb lights shall illuminate when the rear door is unlocked
159 9
2 TS 75.16 Interior Panels, Step
Lighting
Test
Documentation
Pilot Vehicle Prior
to Production
Step lighting for the intermediate steps between lower and upper floor levels shall be a minimum of four foot-candles and shall illuminate in all engine run positions.
172
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
160 9
3 TS 75.17 Interior Panels, Ramp
Lighting (Transit Bus)
Test
Documentation
Pilot Vehicle Prior
to Production
Exterior and interior ramp lighting shall comply with CFR Part 49, Section 38.31.

Lights shall be provided at the doorway equipped with the wheelchair access system to floodlight the loading area.

The light shall be wired through the ramp master toggle switch on the driver’s dash and shall automatically illuminate when this switch is in the “On” position.

During ramp operation, the street surface shall be illuminated to a minimum o f six candlepower a distance of three (3) feet beyond the external dimensions of the ramp platform once deployed.
161 9
4 TS

75.19.1 Farebox Lighting, Transit
Bus
Test
Documentation
Pilot Vehicle Prior
to Production
A light fixture shall be mounted in the ceiling above the farebox location. The fixture shall be capable of projecting a
concentrated beam of light on the farebox. The light shall illuminate the top of the fare box and the surrounding floor area to a minimum of 15 foot-candles.
162 TS 76 Fare Collection Documents,
Drawings
Pre-Production
Meetings
The Contractor shall provide and install GFI Genfare Odyssey Validation farebox base plate, power leads and ITS interface cable, subject to LACMTA approval…
163 TS 76 Fare Collection Documents,
Drawings
Pre-Production
Meetings
A one-inch inside diameter waterproof conduit shall be
provided from the ITS enclosure to the farebox base plate mounting location, through the Bus floor, to protect the power leads and ITS interface cable, subject to LACMTA approval… 164 TS 77 Interior Access Panels
and Doors (Transit Bus)
Documents,
Drawings
Pre-Production
Meetings
Removal of fixtures or equipment unrelated to the repair task to gain access shall be precluded or used only subject to LACMTA approval…
165 TS 77 Interior Access Panels
and Doors (Transit Bus)
Documents,
Drawings
Pre-Production
Meetings
Access doors shall be hinged with gas props or nover-center springs, where practical, to hold the doors out of the
mechanic’s way subject to LACMTA approval during pre-
production meetings. All overhead doors shall be hinged at the top and shall be prevented from coming loose or opening during transit service or in bus cleaning operations. Panel fasteners shall be standardized so that only one tool is required to service all special fasteners within the Bus subject to LACMTA approval…
173
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
166 9
5 TS 78.13 Passenger Seating,
Structure and Design
Test
Documentation
Pre-Production
Meetings
Seat back handhold and armrests shall withstand static
horizontal and vertical forces of 250 lbs applied anywhere along their length with less than ¼-inch permanent
deformation. Seat back handhold and armrests shall withstand 25,000 impacts in each direction of a horizontal force of 125 lbs with less than ¼-inch permanent deformation and without visible deterioration.
167 TS 78.15
Passenger Seating,
Construction and
Materials
Documents,
Drawings
Pre-Production
Meetings
Selected materials shall minimize damage from vandalism and shall reduce cleaning time. The seats shall be attached to the frame with tamper-resistant fasteners and is subject to LACMTA approval…
168 9
6 TS 79. Passenger Assists,
(Transit Bus) Demonstration Pilot Vehicle at
Factory
Passenger assists shall be convenient in location, shape, and size for both the 95th-percentile male and the 5th-percentile female standee.
169 9
7 TS 79.1 Assists (Transit Bus)
Certification &
Test
Documentation
Pre-Production
Meetings
Passenger assists shall be capable of passing the NHTSA Drawstring Test. A crash resulting in a one- foot intrusion shall not produce sharp edges, loose rails, or other potentially dangerous conditions associated with a lack of structural integrity of the assists.
170 9
8 TS 79.1 Assists, (Transit Bus) Test
Documentation
Pre-Production
Meetings
Assists shall withstand a force of 300 lbs applied over a 12- inch lineal dimension in any direction normal to the assist without permanent visible deformation.
171 9
9 TS 79.1 Assists, (Transit Bus) Inspection Pilot Vehicle at Factory
All passenger assists shall permit a full hand grip with no less than 1½ inches of knuckle clearance around the assist.
172 1
0 0
TS 79.3 Vestibule (Transit Bus) Demonstration Pilot Vehicle at Factory
The front assist should not impede wheelchair boarding and provide adequate clearance and access to the farebox during vaulting and maintenance.
173 TS 79.6 Longitudinal Seat Assists
(Transit Bus)
Documents,
Drawings
Pre-Production
Meetings
A vertical assist or grabrail shall be provided convenient to the outer rear settee seats if they are immediately behind an aisle facing seat subject to LACMTA approval…
174 TS 80.1 Passenger Doors, Transit
Bus
Documents,
Drawings Proposal Period
All passenger door components, except door panels and
glazing, must come from one single manufacture, subject to LACMTA approval…
175 TS 81.1 Accessibility Provisions,
Loading Systems
Documents,
Drawings Proposal Period
Bus shall utilize a low-floor fully electrically operated, preferably self-leveling wheelchair ramp system subject to LACMTA approval…
174
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
176 1
0 2
TS 81.3 Accessibility Provisions,
Lift
Test
Documentation
Pre-Production &
Pilot Vehicle Prior
To Production
The loading platform shall be covered with a replaceable or renewable nonskid material and shall be fitted with devices to prevent the wheelchair from rolling off the sides during loading or unloading.

Deployment or storage of the ramp shall require no more than 15 seconds.

Each operation shall require continues manual pressure to the momentary switch by the operator and shall not allow
unintentional improper access system operation. The device shall function without failure or adjustment for 500 cycles or 5,000 miles in all-weather conditions on the design operating profile when activated once during the idle phase. A manual override system shall permit unloading a wheelchair and storing the device in the event of a primary power failure. The manual operation of the ramp shall not require more than 35 lbs of force.
177 TS 81.5 Wheelchair
Accommodations
Documents,
Drawings Proposal Period
Forward facing wheelchair securement and occupant restraint systems shall be the QPod or approved equal, subject to LACMTA approval…
178 TS 81.5.2
Wheelchair
Accommodations, Rear
Facing
Documents,
Drawings
Pre-Production
Meetings
Fabric covering on the padded barrier shall be blue, subject to LACMTA approval.
179 TS 83
Signage and
Communication,
Destination Signs
Documents,
Drawings
Pre-Production
Meetings
The destination sign compartments shall meet the following minimum requirements.

Compartments shall be designed to prevent condensation and entry of moisture and dirt.

Compartments shall be designed to prevent fogging of both compartment window and glazing on unit itself.

Access shall be provided to allow cleaning of inside
compartment window and unit glazing, subject to LACMTA
approval in Pre-Production meetings.

Front window exterior display area shall be sized to allow full visibility of the front destination sign.
180 1
0 3
TS 83. Destination Signs,
(Programming) Deliverable Pilot Vehicle
Delivery in L.A.

Software shall be furnished for programming the sign system via an IBM compatible lap-top computer.
175
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
181 TS 84.1 Passenger Information,
Interior Displays
Documents,
Drawings
Pre-Production
Meetings
“Take one” boxes shall be mounted at both the front and rear doors in convenient locations for passengers and the minimum “take twelve” unit shall be located in a convenient location towards the front of the bus, subject to LACMTA approval... 182 TS 85.1 Passenger Stop
Request/Exit Signal
Documents,
Drawings
Pre-Production
Meetings
A minimum of twelve stop request signal buttons utilizing a yellow housing shall be evenly distributed in the passenger cabin to be functionally accessible to all seated passengers subject to LACMTA approval...
183 TS 85.1 Passenger Stop
Request/Exit Signal
Documents,
Drawings Proposal Period
Pricing for the installation of a wireless pushbutton switch system shall be provided on PF-1 Form, Schedule of Optional Vehicle Configuration.
184 TS 86 Communications Documents,
Drawings
Pre-Production
Meetings
Service light(s) with suitable switch shall be provided within the enclosure, subject to LACMTA approval.
185 TS 86.1 Camera Surveillance
System Demonstration Pilot Vehicle at
Factory
A day-to-night demonstration shall be required to establish camera performance and final placement for optimum views and clarity. The LACMTA shall witness the demonstration and approve the final placement of the cameras. This
demonstration must be successful ly completed prior to
approval of the pilot bus(s).
186 TS 86.1 Camera Surveillance
System, Interior Cameras
Documents,
Drawings
Pre-Production
Meetings
Front interior camera(s) at front door passenger boarding area shall record audio subject to LACMTA approval...
176
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
187 1
0 4
TS 86.1
Camera Surveillance
System, Interior Cameras,
Exterior Cameras
Documentation Pilot Vehicle at
Factory
Cameras shall be placed for best recording of the following five (5) areas:
a) Forward 1/3 of passenger area, view of front vestibule, farebox transactions and field of view to include
operator and image of bus number located on operator’s
barrier
b) Front door, passenger boarding
c) Rear door, passenger exiting
d) Middle 1/3 passenger area
e) Rear 1/3 passenger seating area starting from behind rear door with a primary emphasis on the rearmost
seats.

Cameras shall be placed for best recording of the following four (4) areas:
a) Forward looking through windshield (Accident
Surveillance)
b) The curb side area of the Bus, (including exit door), and street from ten feet beyond front bumper to ten feet
beyond rear bumper
c) Street side area of the Bus and street from ten feet beyond the front bumper to ten feet beyond the rear
bumper
d) Rear camera shall view the ground behind the Bus
from the bumper to approximately 25 feet back
188 TS 86.1 Exterior Cameras Demonstration Pilot Vehicle at Factory
Camera positions and adjustment are subject to LACMTA
approval…
189 TS 86.1 Camera Monitor Documentation Pre-Production Meetings
Final monitor configuration is subject to LACMTA approval during pre-production meetings.
190 1
0 6
TS 86.1
Camera Surveillance
System, Central
Processor
Inspection Pilot Vehicle at
Factory
The video security system central processor shall be
packaged in a suitable ventilated shock mounted and splash resistant enclosure keyed to LACMTA standards, located
within the ITS enclosure, subject to LACMTA approval…
177
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
191 TS 86.1 System Management
Tool Documentation Pre-Production
Meetings
shall incorporate a system management tool for; wireless download of video files in a timely manner, software upgrades, camera checks, configuration changes and health reports as required. Final configuration is subject to LACMTA approval. 192 TS 86.1 System Management
Tool Documentation Proposal Period
Pricing of the system management tool for use at up to 13 LACMTA operating divisions shall be provided to the LACMTA on Price Form PF -4, Schedule C of Prices of Diagnostic Test Equipment.
193 TS 86.1 Enhanced Video
Recording System Option Documentation Proposal Period
Pricing for optional features to enhance the video recording system shall be provide d on Price Form PF -1, Schedule of Optional Vehicle Configuration.

Ability of video system to analyze and discern events such as wheelchair passengers and generate report information with summary data such as wheelchair passenger count and
boarding/alighting locations.

The ability to utilize the dash mounted display for diagnostic work or configuration changes on the DVR.

Incorporation of a 360 degree camera(s) for better surveillance of bus interior.
194 TS 86.2 Public Address System Documentation Pre-Production Meetings
The location of the gooseneck microphone is subject to
LACMTA approval in pre-production meetings.
195 TS 86.3 Automatic Passenger
Counter (APC) Documentation Pre-Production
Meetings
Provisions and necessary cables for installation of door sensors and analyzer(s) for IRMA-3 infrared APC system shall be provided subject to LACMTA approval.
196 TS 86.3 Automatic Passenger
Counter (APC) Documentation Proposal Period
As an option, LACMTA may consider incorporating an
installation of IRMA -Matrix infrared APC System. Pricing to include; installation, cabling, door sensors, analyzer(s), software, integration testing, first article acceptance and any other items necessary for proper operation shall be submitted on form PF-1, Schedule of Optional Vehicle Configuration. 197 TS 86.4.4 Emergency Alarm Documentation Pre-Production Meetings
SAS switch location and lead wire routing is subject to LACMTA approval...
198 TS 86.8 ITS Provisions, WLAN Documentation Pre Production Meetings
Sierra Wireless InMotion MG90 or an approved equal wireless router/switch and feedline shall be installed, subject to LACMTA approval…
178
Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2018 Modification No. 4- REV 1.24.18 Item Section Title Deliverable Schedule Requirement
199 TS 86.9 ITS Provisions, Radio
Antennas Documentation Pre-Production
Meetings
The antenna mounting and lead termination shall be
accessible from the Bus interior, subject to LACMTA
approval…
200 1
0 7
TS 86.10 ITS Provisions, Global
Positioning System (GPS) Documentation Pre-Production
Meetings
The GPS Antenna shall be mounted on the centerline of the roof of the bus near the front, with a quick disconnect, within two feet from the antenna, for future replacement subject to LACMTA approval…
See TS 88.1 Approved Equals.
201 TS 86.11 ITS Provisions, IBSS Documentation Pre-Production Meetings
Battery and ignition power and a separate J1939
communication connection shall be supplied in the ITS
enclosure, subject to LACMTA approval…
202 1
0 8
TS 88.2 Maintainability
Requirements Demonstration Pilot Vehicle at
Factory and in LA
The Contractor shall be required to demonstrate these
maintenance tasks using the information contained in the service and parts manuals.

Los Angeles County
Metropolitan Transportation Authority
MetroMAEL-019
Date:

File Nos.:

Action Item(s):

CDRL:

March 19, 2018
Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509
One Gateway Plaza si3.gz~.z000 Tel
Los Angeles, CA gooiz-z95z metro.net
Response Required: No
SUBJECT: EXECUTED CONTRACT MODIFICATION NO. 5
OP28367-000 40' LOW FLOOR CNG TRANSIT BUSES
Reference: MAEL-D14, 017; ELMA-028; 032; 034
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

If you have any questions, I can be reached at 213.922.7334 ore-mail at hernandezelCc~~.metro.net.

Sincerely,
~-~
f , ,~.~~Q~~
Elizabeth Hernandez
Principal Contract Administrator
cc: Wayne Okubo
Kwesi Annan
Phil Rabottini
CDRL NO.: n/a
MAEL-019 DATE: March 19, 2018

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 5
FOR: FORTY FOOT (40') LOW FLOOR CNG TRANSIT BUSES
This Contract Modification No. 5 to Contract No.: OP28367-000 is made effective on the 12~' day of February 2018 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

W HEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017 and Contract Modification No. 4 dated January 19, 2018 (the "Existing ContracY~ and; W HEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the parties as follows:

1. Change in the rear axle model from Mentor 71000 to Mentor 79000, and retrofit of two pilot buses with upgraded rear axle model for an aggregate increase of $355,714 in the total Contract Price from $198,691,975 to $199,047,689. Article IV COMPENSATION shall read as follows:

ARTICLE IV: COMPENSATION
A. Contract Price

1. In consideration of the Contractor's full performance of the Work, and in accordance with the terms of the Contract, Metro will pay the Contractor the Contract Price of X199,047,689 $~-9~;6a~b inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions.

Contract Options may be exercised unilaterally by LACMTA in accordance with Special Provisions Article SP-28, Options.

2. Revised Pricing Forms: PF 1 and PF-1A as attached to this mod cation no. 5.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 5 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC.

By: Signatur

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
Philip A. Washington
Chief Executive Officer
Contract Modification No. 5 Page 1 of 2 Contract No.: OP28367-000 Issued: X2/12/18 CA: EH

r~ ~ G~~y.~ By: • ~ c~
Type or Print Name EI' abe h Hernandez
Principal Contract Administrator
Da te Date
Contract Modfficatian No. 5 Page 2 of 2 Contract No.: OP28367-000 Issued: 02/12/18 CA: EH

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modificati
on
No.
5 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

1.0 CONTRACT
FOR
295
BUSES
(BASE
BUY)

Taxable
No.
~f
.

Description
of
Item
Unit
Price
Unit
Price
Total
Price
1 295
40'
Low
Floor
CNG
Buses
(Base
Buvl
from
PF-1A
Values
derived
from
PF-1A*_
S595.257.25
S614.997
S181.424.188.75
1a
Lot
Manuals
(Base
Buy)
(TS

5.6.4)
$2,281.50
Lump
Sum
X23,400.00
1b
295
Vehicle
Delivery
Charge
for
Base
Buy
Value
of
all
taxable
delivery
charges
per
bus*':
5275.00
$81,125.00
1c
Tax
(Base
Buy)

9.75%
558,037.58
S17,123
:368
2 2
Pilot
Buses
Retrofit
with
Rear
Axle
Upgrade
S8,600
S17,201
2a
Tax

9.75%
S838.55
S1,677
3 Lot
Reserved
4 Lot
Reserved
5 Lot
Reserved
6 Lot
Reserved
7 Lot
Performance
Bond
(Base
Buy)
Lump
Sum
X119,336.00
8 1,000
Total
Training
Hours
for
Base
Buy"*
X175,000.00
8a
900
Contractor
(Proposer/Prime)
Base
Buy
$175.00
$157,500.00
Sb
100
Subcontractor/Supplier
Base
Buy
$175.00
$17,500.00
9 1
System
Management
Tool
for
use
at
up
to
(13)
MTA
Operating
Divisions
per
TS

86.1 $74,930.00
$74,930.00
10a
15 Special
Towing
Equipment
(TS
25)
$386.00
$5,790.00
10b
Tax

9.75%
53 7.64
$564.53
11 a
2 Rear
Recovery
Devices/Tie
Downs
(TS
25)
5505.00
$1,010.00
11 b
Tax

9.75%
$49.24
$98.48

1.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses
(Sum
of
Items
"1"
through
"11b")
to
be
the
BASIS
for
Price
Proposal
evaluation
O
NE

HUNDRED

NINETY-NINE

MILLION
FORTY
SEVEN

THOUSAND
SIX

HUNDRED
SIXTY
In
U.S.

Dollars
Usinp
Words:

TWO

DOLLARS
In
U.S.

Dollars
Using
Figur
es:
$199,047,689

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
1 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.
5 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.
,I
Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
NOTE
*Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
"
` Input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
"*"
Training
Hours
for
Base
Buy
are
only
estimates
and
not
a
guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
2 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Con
tract
Modifi
cation
No.
5 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

2.0 CONTRACT
FOR
150
UP
TO
305
BUSES
(OPTION
BUY)

Taxable
N
O.
~
Description
of
Item
~ ~_:a
n_:__
~ ~_:a
n_:__
~r_~_~
n_:__
10 305
40'
Low
Floar
CNG
Buses
(Option
Buy)
from
PF-1A
for
150
to
305
vehicles`
S595,257.38
X614.997
S187,574
;161.25
10a
Lot
Manuals
(Option
Buvl
RS

5.6.4)'*~
X2.281.50

Lumn
Sum
X23.400.00
10b
305
Vehicle
Delivery
Charge
for
Option
Buy
Value
of
all
taxable
delivery
charges
per
bus**:

50.00 $275.00S58
;037.59
$83,875.00
10c
Tax
(Option
Buy)

9.75%
S17,703,747.84
11 Reserved
$
$
12 Lot
Performance
Bond
for
Option
Buy**'
Lump
Sum
5123,421.00
13 500
Total
Training
Hours
for
Option
Buy*~*'
$8
7,50Q.00
13a
450
Contractor
(ProposedPrime)
Option
Buy
5175.00
$78,750.00
13b
50 Subcontractor/Supplier
Option
Buy
S175.00
$8,750.00
14 Reserved
$
$

2.0 Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
(Sum
of
Items
"10"
through
"14")
to
be
the
BASIS
for
Price
Proposal
evaluation
TWO
-HUNDRED
FIVE

MILLION
TWO

HUNDRED
FORTY
SEVEN

THOUSAND
EIGHT

HUNDRED
In U.S.

Dollars
Usinq
Words:

NINETY
ONE

DOLLARS
In
U.S.

Dollars
Using
Figures:
$205,596,105
NOTE
*Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
;'
input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
"""
For
proposal
purposes
only,
Manuals
and
Bond
prices
are
for
all
305
bus
Options
exercised.

Actual
cost
will
depend
on
Option
quantity
ordered.
*"_'
Training
Hours
for
Option
Buy
are
only
estimates
and
not
a
guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount.

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
3 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.
5 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

3.0 No.

OPTIONAL

VEHICLE

CONFIGURATION
~(
.

Description
of
Item
Unit
Price
Total
Price
15 1
3 ADA
Securement
Configuration
TS

81.5 (Total
15a
- 15d)
$6,370.00
15a
Direct
Materials/Equipment
$5,750.00
15b
Labor
Installation
Costs
$620.00
15c
Non
Recurring
Cost
$0.00
15d
Other
Costs
(Identify)
$0.00
16 1
4 ADA
Securement
Configuration
TS

81.5 (Total
16a
- 16d)
$10,170.00
16a
Direct
Materials/Equipment
$9,150.00
16b
Labor
Installation
Costs
$1,020.00
16c
Non
Recurring
Cost
X0.00
16d
Other
Costs
(Identify)
$0.00
17 600
Reserved'~'~
17a 17b
295305
ReservedReserved
18 600
25 -Year
Certified
CNG
Tanks
$522,000.00
18a 18b
295305
25 Yr
Certified
CNG
Tanks
for
Base
Buy
25 Yr
Certified
CNG
Tanks
for
Option
Buy
for
150
up
to
305
vehicles
$256,650.00
5870.00
i
$265,350.00
$870.00
j
19 600
Complete
Automatic
Passenger
Counter
System
TS

86.3 (Total
19a
-19h)
$2,757,600.00
19a
295
Direct
Materials/Equipment
for
Base
Buy
APC
$4,136.00
19b
295
Labor
Installation
Costs
for
Base
Buy
APC
$460.00

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
4 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.
5 Proposer.
~LDORADO

NATIONAL
(CALIFORNIA),
INC.

C
ontract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
19c
295
Non
Recurring
Cost
for
Base
Buy
APC
$
19d
295
Other
Costs
(Identi
)for
Base
Bu
APC
$
Total
for
Base
Buy
APC
$1,355,820.00
$4,59

6.00 19e
305
Direct
Materials/Equipment
for
Option
Buy
APC
for
150
up
to
305
vehicles
X4,136.00
~
19f
305
Labor
Installation
Costs
for
Option
Buy
APC
for
150
up
to
305
vehicles
$460.00
19g
305
Non
Recurring
Cost
for
Option
Buy
APC
for
150
up
to
305
vehicles
S
19h
305
Other
Costs
(Identify)
for
Option
Buy
APC
for
150
up
to
305
vehicles
S
Total
for
Option
Buy
APC
for
150
up
to
305
vehicles
$1,401,780.00
~ $4,596.00
20 600
Enhanced
360
degree
Camera
System
TS

86.1 (Total
20a
- 20h)
$579,000.00
20a
295
Direct
Materials/Equipment
for
Base
Buy
Enhanced
Camera
System
$869.00
20b
295
Labor
Installation
Costs
for
Base
Buy
Enhanced
Camera
System
$96.00
20c
295
Non
Recurring
Cost
for
Base
Buy
Enhanced
Camera
System
$
20d
295
Other
Costs
(Identify)
for
Base
Buy
Enhanced
Camera
System
~
Total
for
Base
Buy
Enhanced
Camera
System
5284,675.00
$965.00
20e
305
Direct
Materials/Equipment
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$869.00
20f
305
Labor
Installation
Costs
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$96.00
20g
305
Non
Recurring
Cost
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$
20h
305
Other
Costs
(Identify)
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$
Total
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$294,325.00
X965.00
21 600
USB
Ports
for
Passenger
Charging
Only
$288,000.00
21 a
295
USB
Ports
for
Passenger
Charging
Only
for
Base
Buy
$141,600.00
$480.00
21 b
305
USB
Ports
for
Passenger
Charging
Only
for
Option
Buy
for
150
up
to
305
vehicles
$146,400.00
$480.00

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
5 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modi
fic
ation
No.
5 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

C
ontract
No.:

O
P2836
7-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
22 600
Optional
Wireless
Stop
Request
Switches
(Bus
set)
$291,000.00
22a
295
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Base
Buy
$143,075.00
$485.00
22b
305
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Option
Buy
for
150
up
to
305
vehicles
$147,925.00
$485.00
23 600
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
$2,070,000.00
23a
295
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Base
Buy
X1,017,750.00
$3,450.00
23b
305
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Option
Buy
for
150
up
to
305
vehicles
$1,052,250.00
$3,450.00
24 Lot
Spare
Parts
(From
Schedule
A,
Form
PF-2)
S2,203,445
65 25
Lot
Special
Tools
(Schedule
B
Form
PF-3)
$7,710.00
26 Lot
Diagnostic
Test
Equipment
(Schedule
C,
Form
PF-
4)
$355,010.00
27 Lot
Training
Aids
(Schedule
0,
Form
PF-5)
~958,46Q.00

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
(Sum
of
Items
"15
through
27")
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation.

TEN
-MILLION
FORTY
EIGHT

THOUSAND
SEVEN

HUNDRED
SIXTY
FIVE

DOLLARS
~
SIXTY-
ln
U.S.

Dollars
Using
Words:

FIVE
CENTS
In
U.S.

Dollars
Using
Figures:
$10,048,765.65
""'"'
Proposer
shall
provide
base
Low
Nox
Engine
for
each
bus
with
the
following
Emission
Levels:

ISLG
engine
is
not
the
base
engine
requirement.

Low
Nox
engine
is
the
base
requirement
and
therefore
no
longer
an
option.

Oxides
of
Nitrogen
(NOx)
Grams
per
brake
horsepower
-hour
Particulate
Matter
(PM)
grams
er brake
horse
ower
hour

0.02 0.01

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
6 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.
5 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

4.0 CONTRACT
FOR
BASE
BUY,
OPTION
BUY,
AND

OPTIONALVEHICLE

CONFIGURATION
No.
(tom
.

Descriation
of
Item
Total
Price

1.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses
to
be
the
BASIS
for
Price
Proposal
evaluation
$199,047,689

2.0 Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
to
be
the
BASIS
for
Price
Proposal
evaluation
$205,596,105

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation
$10,048,766

4.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses,
for
150
up
to
305
Option
Buy
Buses,
and
Optional
Vehicle
Configuration
for
Optional
Equipment
combined
to
be
the
overall
BASIS
for
Price
Proposal
evaluation
FOUR
-HUNDRED

THIRTEEN

MILLION
NINE

HUNDRED
EIGHTY
EIGHT

THOUSAND
SIX
In
U.S.

Dollars
Usin
Words:
~~ HUNDRED
THIRTY
ONE

DOLLARS
In
U.S.

Dollars
Using
Figures:
$414,692,560
`~'<
<~
(S'
nature
Q
Perso
Executing
Proposal)
Date
STONY
WAYNE
VICE

PRESIDENT
&GENERAL

MANAGEI
Type
Name,
Title

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
7 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1A
(CNG
- 40')
S

UBSYSTEM

EQUIPMENT
C

ONTRACT

MODIFICATION
NO.
5 C
ontractor:

ELDORADO

NATIONAL
(CALIFORNIA),
INC
Contract
No.:

OP28367-000
BASE
BUY
NO.

DESCRIPTION
OF
ITEM
1 Purchased
Subsystem
Equipment
(Items

1.1 through

1.99)
**

1.1 TS

9. Propulsion
Power
Assembly
(PPA)*""
$18,372

1.2 TS

9. Engine
$60,324

1.3 TS

10. Cooling
System
$12,650

1.4 TS

18. Fuel
System
$68,300

1.5 TS

31. Suspension
$19,950

1.6 TS

33. Steering
System
$4,950

1.7 TS

37. Brakes
$3,260

1.8 TS

39. Pneumatic
System
$6,850

1.9 TS

42. Charging
System
$36,800

1.10 TS

44. Multiplex
Control
System
$24,200

1.11 TS

54. HVAC
Climate
Control
System
$29,450

1.12 TS

78. Passenger
Seats
$28,955

1.13 TS

80. Doors
$14,830

1.14 TS

81. Accessibility
Provisions
$19,740

1.15 TS

86. Communications
$3,244

1.16 TS
11 Transmission
$14,261

1.17 TS

78.1 USB
Passenger
Charging
Port
$480

1.18 TS85.1
Wirelesss
Stop
Request
Button
$485

1.19 TS

86.3 Matrix
APC
$4,596

1.99 TS
34 Meritor
Rear
Axle
Upgrade
$1,040
All other
bus
subsystem
equipment
not
included
above
$242,260
TOTAL
CNG
BUS
PRICE
'
$614,997.25
*Transfer
Total
CNG
Bus
Price
to
Contract
Price
Summary
Form
(PF-1
-Unit
Price
column,
line
Item
1 -Base
Buy
Notes:

1. *'
Price
shall
include
design,
engineering,
manufacturinglassembly,
testing,
shipping,
profit
and
other
associated
costs.

Price
for
each
subsystem
equipment
shall
include
all
applicable
apparatus.

2. Price
for
line
Item
Nos.
1a-27
in
the

CONTRACT
PRICE
SUMMARY(Form
PF-1)
shall
not
be
included
in
computing
price
of
any
of
the
line
items
above.

3. t"
PPA
unit
price
for
line
item

1.1 excludes
prices
for
items

1.2 through

1.99 Page
1 of
2 Pricing
Form
PF1A
- CNG
40'

SUBSYSTEM

EQUIPMENT
Contract
Mod.

No.5

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1A
(CNG
- 40')

SUBSYSTEM

EQUIPMENT

CONTRACT

MODIFICATION
NO.
5 OPT10N
BUY
NO.

DESCRIPTION
OF
ITEM
2 Purchased
Subsystem
Equipment
(Items

2.1 through

2.99)
**

2.1 TS

9. Propulsion
PowerAssembiy
(PPA)***
$18,372

2.2 TS

9. Engine
$60,324

2.3 TS

10. Cooling
System
$12,650

2.4 TS

18. Fuel
System
$68,300

2.5 TS

31. Suspension
$19,950

2.6 TS

33. Steering
System
$4,950

2.7 TS

37. Brakes
$3,260

2.8 TS

39. Pneumatic
System
$6,850

2.9 TS

42. Charging
System
$36,800

2.10 TS

44. Multiplex
Control
System
$24,200

2.11 TS

54. HVAC
Climate
Control
System
$29,450

2.12 TS

78. Passenger
Seats
$28,955

2.13 TS

80. Doors
$14,830

2.14 TS

81. Accessibility
Provisions
$19,740

2.15 TS

86. Communications
$3,244

2.16 TS
11 Transmission
$14,261

2.17 TS

78.1 USB
Passenger
Charging
Port
$480

2.18 TS85.1
Wirelesss
Stop
Request
Button
$485

2.19 TS

86.3 MatrixAPC
X4,596

1.99 TS
34 Meritor
Rear
Axle
Upgrade
X1,040
All other
bus
subsystem
equipment
not
included
above
$242,260
TOTAL
CNG
BUS
PRICE
OPTION

QUANTITY
$614,997
*Transfer
Total
CNG
Bus
Price
to
Contract
Price
Summary
Form
(PF-1
-Unit
Price
column,
-line
item
10 -Option
Buy)
Notes:

1. "Price
shall
include
design,
engineering,
manufacturing/assembly,
testing,
shipping,
profit
and
other
associated
costs.

Price
for
each
subsystem
equipment
shall
include
all
applicable
apparatus.

2. Price
for
line
Item
Nos.
1-9
and
10a-27
in
the

CONTRACT
PRICE
SUMMARY(Form
PF-1)
shall
not
be
included
in
computing
price
of
any
of
the
line
items
above.

3. ~"
PPA
unit
price
for
line
item

2.1 excludes
prices
for
items

2.2 through

2.99 3~~~~
(Signs
re
of
Person
Executing
Proposal)
Date
TONY
WAYNE
NICE

RESIDENT
&GENERAL

MANAGER
Type
Name,
Title
Page
2 of
2 Pricing
Form
PF1A
- CNG
40'

SUBSYSTEM

EQUIPMENT
Contract
Mod.

No.S

Los Angeles County One Gateway Plaza zi3.g22.2o0o Tel
MetropotitanTransportation Authority Los Angeles, CA gooiz•i95z metro.net MetroMAEL~024~_~, _~___ m,_~_______~_~„_~ _, _,_, __ eRsponseRequired:~No Date: May 3, 2018
File Nos.:

Action Item(s):

CDRL:

Richard Himes
Contract Administration Manager
Eldorado National (California}, Inc. (ENC)
9670 Galena Street
Riverside, CA 92509
SUBJECT: EXECUTED CONTRACT MODIFICATION NO. 5
OP28367-000 40' LOW FLOOR CNG TRANSIT BUSES
Reference: MAEL-022, 023, ELMA-026
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

If you have any questions, I can be reached at 213.922.7334 ore-mail at hernandezel(c~metro.net.

Elizabeth Hernandez
Principal Contract Administrator
cc: Wayne Okubo
Kwesi Annan
Phil Rabottini
CDRL NO.: n/a
MAEL-024 DATE: May 3, 2018

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 6
FOR: FORTY FOOT (40') LOW FLOOR CNG TRANSIT BUSES
This Contract Modification No. 6 to Contract No.: OP28367-000 is made effective on the 23`~ day of April 2018 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

W HEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018, and Contract Modification No. 5 dated February 12, 2018 (the "Existing Contract") and;
W HEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the parties as follows:

1. Revise SP-05 as follows:

SP-OS APPROVED SUBCONTRACTORS
Subcontractor Services Performed DBEI
MBE/
W BE
^~^ ;r Kidde Technolo ies, Inc. Methane Gas Detection S stem Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 6 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC.

By:

Signatu e
~ ~ ~~7ti
Type or Print Name
3G, ~ ~
Date

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
Philip A. Washington
Chief Executive Officer
By: ~"
lizabeth Hernandez
Principal Contract Administrator
jl ~
Date
Contract Modification No. 6 Page 1 of 1 Contract No.: OP28367-D00 Issued. 04/23/18 CA: EH

Los Angeles Caunty
Metropolitan Transportation Authority
MetroMAEL-030
Date:

File Nos.:

Action Item(s):

CDRL:

October 12, 2018
Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509
One Gateway Piaza zt3.gzs.z000 Te(
Los Angeles, CA 9ooi~-a95z metro.net
Response Required: No
SUBJECT: EXECUTED CONTRACT MODIFICATION NO. 7
OP28367-000 40' LOW FLOOR CNG TRANSIT BUSES
Reference: MAEL-029, 023, ELMA-044; 046
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

If you have any questions, I can be reached at 213.922.7334 ore-mail at hernandezel(a~metro.net.

Sincerely,
~~ ~~~ r
Elizabeth Hernandez
Principal Contract Administrator
cc: Wayne Okubo
Kwesi Annan
CDRL NO.: n/a
MAEL-030 DATE: October 12, 2018

f~~1`► [~T~~ ~~d•1~I ~ti~'[uL~~3~11•]S~~s1► i x:7_1 ~ ~91•]:i~~~ [•7 ~ I_<<y ~: C•13t~'1 CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 7
FOR: FORTY FOOT (40') LOW FLOOR CNG TRANSIT BUSES
This Contract Modification No. 7 to Contract No.: OP28367-000 is made effective on the 3RD day of October 2018 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

WHEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018, Contract Modification No. 5 dated February 12, 2018 and Contract Modification No. 6 dated April 23, 2018 (the "Existing Contract") and; WHEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the parties as follows:

Change bike rack from Sportsworks Apex 3 to Byk Rak 3 position for an aggregate decrease of $102,361, inclusive of applicable taxes, in the total Contract Price from $199,047,689 to $198,945,328. Article IV COMPENSATION shall read as follows:

ARTICLE IV: COMPENSATION
A. Contract Price

1. In consideration of the Contractor's full pertormance of the Work, and in accordance with the terms of the Contract, Metro will pay the Contractor the Contract Price of X198,945,328 $~84~~ inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions.

Contract Options may be exercised unilaterally by LACMTA in accordance with Special Provisions Article SP-28, Options.

2. Revised Pricing Forms: PF 1, PF-1A and PF 2 as attached to this modification no. 7.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 7 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC.

By:

Contract Modification No. 7 Page 1 of 2
Issued: 10/03/18

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
Philip A. Washington
Contract No.: OP28367-000
CA: EH

Signature Chief Executive Officer
H wy w~y.~ By:Type or Print Name liza th Hernandez
Principal Contract Administrator
/ off ~ 9b~/z,~d
Date Date
Contract Modification No. 7 Page 2 of 2 Contract No.: OP28367-000 Issued: 10103118 CA: EH

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') -CONTRACT PRICE SUMMARY
Contract Modification No.: 7- - -~
Proposer: ELDORADO NATIONAL (CALIFORNIA), INC. j
Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT

1.0 CONTRACT FOR 295 BUSES (BASE BUY) Taxable
No. maC. Descriptjon of Item Unit Price Unit Price Total Price 1 295 40' Low Floor CNG Buses (Base Buvl from PF-1A Values derived from PF-1A*~ SSgn ~.t t n~ 5~~4 ~R t ~~ R~ ~`~n 4~~ ti~ 1a Lot Manuals (Base Buy) (TS 5.6.4) $2,281.50 Lump Sum 123,400.00 1 b 295 Vehicle Delivery Charge for Base Buy Value of all taxable delivery charges per bus'*: X275.00 $81,125.00 1c Tax (Base Buy) 9.75% 558,006.76 517;114,275
2 2 Pilot Buses Retrofit with Rear Aide Upgrade $8,600 $17,201 2a Tax 9,75% $838.55 X1,677
3 Lot Reserved
4 Lot Reserved
5 Lot Reserved
6 Lot Reserved
7 Lot Performance Bond (Base Buy) Lump Sum ! S119,336.00 8 1,000 Total Training Hours far Base Buy*"" $175,000.00 Sa 900 Contractor (Proposer/Prime) Base Buy $175.00 $157,500.00 8b 100 Subcontractor/Supplier Base Buy 5175.00 $17,500.00 9 1 System Management Tool for use at up to (13) MTA Operating Divisions per TS 86.1 $74,930.00 $74,930.00 10a 15 Special Towing Equipment (TS 25) 5386.00 $5,790.00 $564.53
$1,010.00
10b Tax 9.75% X37.64
11a 2 Rear Recovery DevicesTe Downs (TS 25) $505.00
11 b Tax 9.75% $49.24 $98.48

1.0 Total Price for CONTRACT for Z95 Base Buy Buses (Sum of Items "1" through "11 b") to be the BASIS for Price Proposal evaluation OlVE HUNDRED NINETY-EIGHT MILLION NINE HUNDRED FORTY FIVE THOUSAND THREE In U.S. Dollars Using Words: HUNDRED TWENTY EIGHT DOLLARS In U.S. Dollars Using Figures: $198,945,32
LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 1 of 7

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 5

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.:
7 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
NOTE
*Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
"*
Input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
**'
Training
Hours
for
Base
Buy
are
only
estimates
and
not
a
guaranteed
level
of
effort.

The
total
far
this
Line
is
allot-to-Exceed
provisional
amount

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
2 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modificati
on
No.:
7 Proposer:
~ ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(4d')
LOW
FLOOR
CNG
BUS

PROCUREMENT

2.0 CONTRACT
FOR
150
UP
TO
305
BUSES
(OPTION
BUY)
Taxable
No.
(fi
t .

Description
of
Item
Unit
Price
Unit
Price
Total
Price
10 305
40'
Low
Floar
CNG
Buses
(Option
Buy)
from
PF-1A
for
150
to
305
vehicles
5594,941.22
5614,681
X187,477,732.45
10a
Lot
Manuals
(Option
Buy)
(TS

5.6.4)"'
$2,281.50
Lump
Sum
X23,400.00
10b
305
Vehicle
Delivery
Charge
for
Option
Buy
Value
of
all
taxable
delivery
charges
per
bus*':
f 50.00
$275.00
$83,875.00
10c
Tax
(Option
Buy)

9.75%
558
;006.77
517,694,346.03
11 Reserved
$
$
12 Lot
Performance
Bond
for
Option
Buv~"
Lump
Sum
S1?3
4?1.00
13 500
Total
Training
Hours
for
Option
Buy*"'
X87,500.00
13a
450
Contractor
(Proposer/Prime)
Option
Buy
5175.00
$78,750.00
13b
50 Subcontractor/Supplier
Option
Buy
5175.00
$8,750.00
14 Reserved
$
~

2.0 Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
(Sum
of
Items
"10"
through
"14")
to
be
the
BASIS
for
Price
Proposal
evaluation
TWO
-HUNDRED
FIVE

MILLION
FOUR

FIUNDRED
NINETY

THOUSAND
TWO

HUNDRED
In
U.S.

Dollars
Usinq
Words:

SEVENTY
FOUR

DOLLARS
(n
U.S.

Dollars
Using
Figures:
$205,490,274
NOTE
*Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
"*
Input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
**'
For
proposal
purposes
only,
Manuals
and
Bond
prices
are
for
all
305
bus
Options
exercised.

Actual
cost
will
depend
on
Option
quantity
ordered.
*"*
Training
Hours
for
Option
Buy
are
only
estimates
and
not
a
guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount.

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
3 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.:
7 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

3.0 No.

OPTIONAL

VEHICLE

CONFIGURATION
~

Description
of
Item
Unit
Price
Total
Price
15 1
3 ADA
Securement
Configuration
TS

81.5 (Total
15a
- 15d)
$6,370.00
15a
Direct
Materials/Equipment
$5,750.00
15b
Labor
installation
Costs
$620.00
15c
Non
Recurring
Cost
$0.00
15d
Other
Costs
(Identify)
$0.00
16 1
4 ADA
Securement
Configuration
TS

81.5 (Total
16a
-16d)
$10,170.00
16a
Direct
Materials/Equipment
$9,150.00
16b
Labor
Installation
Costs
$1,020.00
16c
Non
Recumng
Cost
$0.00
16d
Other
Costs
(Identify)
$0.00
17 600
Reserved***"
17a 17b
295305
ReservedReserved
18 600
25 -Year
Certified
CNG
Tanks
X522,000.00
18a 18b
295305
25 Yr
Certified
CNG
Tanks
for
Base
Buy
25 Yr
Certified
CNG
Tanks
for
Option
Buy
for
150
up
to
305
vehicles
X256,650.00
$870.00
X265,350.00
$870.00
19 600
Complete
Automatic
Passenger
Counter
System
TS

86.3 (Total
19a
- 19h)
$2,757,600.00
19a
295
Direct
Materials/Equipment
for
Base
Buy
APC
$4,136.00
19b
295
Labor
Installation
Costs
for
Base
Buy
APC
X460.00

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
4 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
C
ontract
Modificati
on
No.:
7 ,—
--
—
--
Proposer:
~ ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
19c
295
Non
Recurring
Cost
for
Base
Buy
APC
~
19d
295
Other
Costs
Identi
)for
Base
Bu
APC
S
Total
far
Base
Buy
APC
51,355,820.00
X4,596.00
19e
3Q5
Direct
Materials/Equipment
fnrOption
Buy
APC
for
150
up
to
305
vehicles
$4,136.00
19f
305
Labor
Installation
Costs
for
Option
Buy
APC
for
150
up
to
305
vehicles
$460.00
19g
305
Non
Recurring
Cost
for
Option
Buy
APC
for
150
up
to
305
vehicles
$
19h
305
Other
Costs
(Identi
)for
Option
Buy
APC
for
150
up
to
305
vehicles
$
Total
for
Option
Buy
APC
for
150
up
to
3Q5
vehicles
$1,401,780.00
$4,596.00
20 600
Enhanced
3fi0
degree
Camera
System
TS

86.1 (Total
20a
- 2010
$579,000.00
20a
295
Direct
Materials/Equipment
for
Base
Buy
Enhanced
Camera
System
5869.00
20b
295
Labor
Installation
Costs
for
Base
Buy
Enhanced
Camera
System
$96.00
20c
295
Non
Recurring
Cost
for
Base
Buy
Enhanced
Camera
System
$
20d
295
Other
Costs
(Identify)
for
Base
Buy
Enhanced
Camera
System
$
Total
for
Base
Buy
Enhanced
Camera
System
$284,675.00
$965.00
20e
305
Direct
Materials/Equipment
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$869.00
20f
305
Labor
Installation
Costs
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$96.00
20g
305
Non
Recurring
Cost
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
5 20h
305
Other
Costs
(Identify)
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$
Total
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
X294,325.00
$965.00
21 600
USB
Ports
for
Passenger
Charging
Only
X288,000.00
21 a
295
USB
Ports
for
Passenger
Charging
Only
for
Base
Buy
$141,600.00
$480.00
21 b
305
USB
Ports
for
Passenger
Charging
Only
for
Option
Buy
for
150
up
to
305
vehicles
$146,400.00
$480.00

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
5 of
7 PRICING
FORM
PF1
- CNG
4d'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.:
7 Proposer:
' ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
22 600
Optional
Wireless
Stop
Request
Switches
(Bus
set)
X291,000.00
22a
295
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Base
Buy
X143,075.00

S485.00
22b
305
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Option
Buy
far
150
up
to
305
vehicles
$147,925.00
5485.
00 23
600
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
X2,070,000.00
23a
295
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Base
Buy
$1,017,750.00
53,450.00
23b
305
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Option
Buy
for
150
up
to
305
vehicles
$1,052,250.00
$3,450.00
24 Lot
Spare
Pacts
(From
Schedule
A,
Form
PF-2)
S2,203,445.65
25 Lot
Special
Tools
(Schedule
B
Form
PF-3)
X7,710.00
26 Lot
Diagnostic
Test
Equipment
(Schedule
C,
Form
PF-
4)
$355,010.00
27 Lot
Training
Aids
(Schedule
D,
Form
PF-5)
$958,460.00

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
(Sum
of
Items
"15
through
27")
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation.

TEN
-MILLION
FORTY
EIGHT

THOUSAND
SEVEN
f fUNDRED
SIXTY
FIVE
DOLI.~RS
&SIXTY
In
U.S.

Dollars
Using
Words:

FIVE
CENTS
In
U.S.

Dollars
Using
Figures:
510,048,765.65
**""
Proposer
shall
provide
base
Low
Nox
Engine
for
each
bus
with
the
following
Emission
Levels:

ISLG
engine
is
not
the
base
engine
requirement.

Low
Nox
engine
is
the
base
requirement
and
therefore
no
longer
an
option.

Oxides
of
Nitrogen
(NOx)
Grams
per
brake
horsepower
-hour
Particulate
Matter
(PM)
grams
er brake
horse
ower
hour

0.02 0.01

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
6 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Con
tract
Modification
No.:
7 Proposer:
, ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

4.0 CONTRACT
FOR
BASE
BUY,
OPTION
BUY,
AND

OPTIONALVEHICLE

CONFIGURATION
No.

Qty.

Description
of
Item
Total
Price

1.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses
to
be
the
BASIS
for
Price
Pro
osal
evaluation
$198,945,328

2.0 Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
to
be
the
BASIS
for
Price
Proposal
evaluation
$205,490,274

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Pro
osal
evaluation
X10,048,766

4.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses,
for
150
up
to
305
Option
Buy
Buses,
and
Optional
Vehicle
Configuration
for
Optional
Equipment
combined
to
be
th
e
overall
BASIS
for
Price
Proposal
evaluation
FOUR
-HUNDRED

FOURTEEN

MILLION
FOUR

HUNDRED
EIGHTY
FOUR

THOUSAND
THREE
In
U.S.

Dollars
Usinq
Words:
~ HUNDRED
SIXTY
EIGHT

DOLLARS
~
In
U.S.

Dollars
Using
Figures:
~$41~,484,368
~ ~
(Si
nature
Pers
Executing
Proposal)
Date
'TONY
WAYNE
VICE

PRESIDENT
8~

GENERAL

MANAGEI
Type
Name,
Title

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
7 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
5 GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1A (CNG - 40')

SUBSYSTEM EQUIPMENT
CONTRACT MODIFICATION NO. 7
Contractor: ELDORADO NATIONAL (CALIFORNIA), INC
Contract No.: oP2s3s7-000

BASE BUY
NO. DESCRIPTION OF ITEM
1 Purchased Subsystem Equipment (Items 1.1 through 1.99) "*

1.1 TS 9. Propulsion Power Assembly (PPA)""* $18,372

1.2 TS 9. Engine $60,324

1.3 TS 10. Cooling System $12,650

1.4 TS 18. Fuel System $68,300

1.5 TS 31. Suspension $19,950

1.6 TS 33. Steering System $4,950

1.7 TS 37. Brakes $3,260

1.8 TS 39. Pneumatic System $6,850

1.9 TS 42. Charging System $36,800

1.10 TS 44. Multiplex Control System $24,200

1.11 TS 54. HVAC Climate Control System $29,450

1.12 TS 78. Passenger Seats $28,955

1.13 TS 80. Doors $14,830

1.14 TS 81. Accessibility Provisions $19,740

1.15 TS 86. Communications $3,244

1.16 TS 11 Transmissifln $14,261

1.17 TS 78.1 USB Passenger Charging Port $480

1.18 TS85.1 Wirelesss Stop Request Button $485

1.19 TS 86.3 MatrixAPC $4,596
I .g9 TS 3~~ Meritor Rear Axle Upgrade $1,040
All other bus subsystem equipment not included above $241,944 TOTAL CNG BUS PRICE ' $614,681
*Transfer Total CNG Bus Price to Contract Price Summary Form (PF-1 -Unit Price column, line Item 1 -Base Buy Notes: 1. *" Price shall include design, engineering, manufacturinglassembly, testing, shipping, profit and other associated costs. Price far each subsystem equipment shall include all applicable apparatus.

2. Price for line Item Nos. 1a-27 in the CONTRACT PRICE SUMMARY(Form PF-1) shall not be included in computing price of any of the line items above.

3. "' PPA unit price for line item 1.1 excludes prices for items 1.2 through 1.99

Page 1 of 2 ends

Pricing Form
PF1A - CNG 40'

SUBSYSTEM EQUIPMENT
Contract Mod. No.7

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1A
(CNG
- 40')
S

UBSYSTEM

EQUIPMENT

CONTRACT

MODIFICATION
NO.
7 NO.

DESCRIPTION
OF
ITEM
2 Purchased
Subsystem
Equipment
(Items

2.1 through

2.99)
"'"

2.1 TS

9. Propulsion
Power
Assembly
(PPA)***
X18,372

2.2 TS

9. Engine
$60,324

2.3 TS

10. Cooling
System
$12,650

2.4 TS

18. Fuel
System
$68,300

2.5 TS

31. Suspension
$19,950

2.6 TS

33. Steering
System
$4,950

2.7 TS

37. Brakes
$3,260

2.8 TS

39. Pneumatic
System
$6,850

2.9 TS

42. Charging
System
$36,800

2.10 TS

44. Multiplex
Control
System
$24,200

2.11 TS

54. HVAC
Climate
Control
System
$29,450

2.12 TS

78. Passenger
Seats
$28,955

2.13 TS

80. Doors
$14,830

2.14 TS

81. Accessibility
Provisions
$19,740

2.15 TS

86. Communications
$3,244

2.16 TS
11 Transmission
$14,261

2.17 TS

78.1 USB
Passenger
Charging
Port
$480

2.18 TS85.1
Wirelesss
Stop
Request
Button
$485

2.19 TS

86.3 Matrix
APC
$4,596
I.99
TS
34 Mentor
Rear
Axle
Upgrade
X1,040
All other
bus
subsystem
equipment
not
included
above
$241,944
TOTAL
CNG
BUS
PRICE
OPTION

QUANTITY
$614,681
* Transfer
Total
CNG
Bus
Price
to
Contract
Price
Summary
Form
(PF-1
-Unit
Price
column,
line
item
10 -Option
Buy)
Notes:

1. "*
Price
shall
include
design,
engineering,
manufacturing/assembly,
testing,
shipping,
profit
and
other
associated
casts.

Price
for
each
subsystem
equipment
shall
include
all
applicable
apparatus.

2. Price
for
line
Item
Nos.
1-9
and
10a-27
in
the

CONTRACT
PRICE
SUMMARY(Form
PF-1)
shall
not
be
included
in
computing
price
of
any
of
the
line
items
above.

3. *'*
PPA
unit
price
for
line
item

2.1 excludes
prices
for
items

2.2 through

2.99 /J~
6 ign
ure
of
Person
Executing
Proposal)
Date
TONY
WAYNE
NICE

PRESIDENT
&GENERAL

MANAGER
Type
Name,
Title
Page
2 of
2 Pricing
Form
PF1A
- CNG
40'

SUBSYSTEM

EQUIPMENT
Contract
Mod.

No.7

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION N0.7
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT {40') LOW FLOOR CNG BUS PROCUREMENT ~O ~lJ I DESCRIPTION OF ITEM g~ UNIT PRICE TOTAL PRICE

LOW NOX ENGINE
1 Ea. Propulsion Power Assembly (See Definition in SP-1) 3 586,270.00 $258,810.00 2 Ea. Air Compressor 5 $6,760.0 $33,800 00
3 Ea. Turbo 3 $1,982.00 $5,946.00
4 Ea. EGR Cooler 20 $1,110.47 $22,209.40
5 Ea. EGR Velve 10 $610.68 $6,106.80
6 Ea. Delta P Sansor 10 $347.66 33,476.60
7 Eo. Mass. Air Flow Sensor 1D S1,067.5fi $10,675.60
8 Ea. Oxygen Sensor 20 X223 61 $4,472.20
9 Ea. Catalyst 5 $3,574.95 $17,874.75
10 Ea. Cylinder Head 5 $4,513.81 $22,569.05
11 Ea. Pistons Kits 60 $325.00 $19,500.00
12 Bus Set Rod Boanngs 10 X64.00 $640.00
13 Bus Set Main Bearing 10 $219.27 $2,192.70
14 Ea. Liners 60 $191.87 $11,512.20
15 Ea. Head Gasket 5 $428.75 $2,143.75
18 Ea. Upper Gasket Set 5 $844.99 54.224.95
17 Ea. Oil Pan Gasket 20 $133.60 $2,672.40
18 Ea, Stiffener Plate Gasket 20 $92.85 $1,857,00
19 Ea. Oil Pan 5 $505.51 $2,527.55
20 Ea. Throttle Actuator 5 $574.16 $2,870.80
21 Ea. Fuel Control Valve 10 $1,429.19 $14,291.90
22 Ea Ignition Control Module 10 $1,648.45 $16,484.50
23 Ea. Ignition Coiis 120 $175.23 $21,027.60
24 Ea. Engine Harness 5 31,493.62 $7,468.10
25 Ea. Ignition Hemess 10 5167.53 $1,675.30
28 Ea. Oil Cooler 5 $179.73 $898.65
27 Ea. Lube Pump 5 $275.51 51,377.55
2B Ea. Front Crank Saal 10 $30.54 $305.40
29 Ea. Rear Seal 10 $28 65 $266.50
30 Ea. Water Pump 10 $175.03 $1,750.3D
31 Ea. Vibration Damper 10 5344.21 $3,442.10
32 Ea. Belt Tensioner (Ii applicable) 20 5145 47 $2,909.40 33 Ea. CoolantTermperature Sensor 20 $11.21 $224,20
34 Ea. Oil Pressure Sensor 10 $98.10 $981.00
35 Ea. Fuel Pressuro Sensor 10 $144.34 $1,443..40
36 Ea. Law Fuel Pressure Regulator 10 51,222.22 $12.222.20 37 Ea. Engine Cradle 5 51,42D.00 $7,100.00
38 Ea. Befit Guard 5 $358.80 $1,794.00
39 Ea. Complete Engine Package (See definition in TS-2) 4 566,430.00 $265,720.04 40 Bus Set Spark Plugs 15 S42 02 $630.30
41 Bus Sot Adaptation Kit (Eng to Trans) 3 $1,066.00 $3,198.00 42 Ea. PPA Doilies 8 S685.00 $5,480.00

COOLING SYSTEM
1 Ea. Radiator Packages (See definition in TS-2) 5 $7,715.00 $39,575.00 2 Ea. Thermal Management Controllers 5 3598.32 $2,991.60 3 Bus Set Fan Resistors 20 $48.60 $972.00
4 Bus Set CAN Interface Cablas 5 5101.25 $5D625
5 Ea. Fan Reversal LED Panel 5 $593.39 52,96fi.95
6 Ea. Fan Assembly 30 540.66 $1,219.80
7 Ea. Coolant Reservoir 10 555620 $5,562.00
8 Ea. Transmission Cooler 10 5648.00 $6,480.00
9 Bus Set Pressure Relief Valve 20 $23.85 $477.00
10 Ea. Radiator Cap 30 $5.27 $158.10
11 Ea, Coolant Overflow Tank 10 S36 29 $362.90

PRICING FORM
Ll~CMTA PFZ • CNG 40'
CONTRACT NO. OP2fi367 000 SCHEDULE A -SPARE PARTS
GA12 93 F'+o- ~ ~~ ~1 Ca~~..~~ Mod. Ne.7

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION NO.7
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP2836T-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT j~0 ~ DESCRIPTIpN OF ITEM gjY UNIT PRICE TOTAL PRICE

CHARGING SYSTEM
1 Ea. Altamator 10 $9,750.00 $97,50D.00
2 Ea. Voltage Regulators 10 $351.00 $3,510.00
3 Ea. Batteries 40 $203.77 $8,150.80
4 Ea. Battery Equiiizer 20 5418.50 $8,370.00
5 Ea. Battery Disconnect 10 $31.82 $318.20
6 Ea. Battery Separator 5 $297.00 $1,485.00
7 Ea. Power Distribution Panel in Battery Compartment 5 $267.30 $1,336.50 8 Ea. Low Voltage Disconnect 10 $44.55 $445.50
9 Ea. Circuit Breaker BOA 20 531.59 $631.80
10 Ea. Circuit BrQaker 100A 20 539.15 $783.00
11 Ea. Circuit Breaker 120A or 130A, whichever applies 20 549.95 $999.00 12 Bus Set Fuse and Circuit Breaker Panels 5 $310.50 $1,552.50

SUSPENSION
1 Bus Set Afr Ride Beams 10 $2,310.00 $23,100.00
2 Bus Set Air Bags 20 5672.00 $13,440.00
3 Ea. Front Axle 10 $4,879.85 $48,798 50
4 Ea. RearAule 10 $3,946.07 X39,460.70
5 Bus Set Radius Rods 5 $412.80 $2,Q64.00
6 Bus Sot Shocks 10 $383 68 x3,836.80
7 Bus Set Leveling Valve Front 10 $191.81 $1,918.10
8 Bus Set Leveling Valve Rear 10 $191.81 $1,918.10

QRNE TRAIN
1 Ea. Transmission , ~ ~ ~;r~ g? ~~~ ~~,
2 Ea. TCM Programmed 5 5611.00 $3,055 00
3 Ea. Adaptat;on Kit (Trans to Eng) 2 $1,666.00 $2,132.00 4 Ee. Drive Shaft 10 $544.00 $5,440.00
5 Ea. Differential 15 $6,972.00 $104,580 00

STEERINGSYSTEM
1 Bus Set Steerfng Gear and Linkage 10 $1,172.50 $11,725.00 2 Ea. Steering Column 10 X596.77 $5,967.70
3 Ea. Stearing Shaft 10 5135.30 $1,353,00
4 Ea. Steering Box Assembly 10 $277.78 $2,777.80
5 Ea. Power Steering Gear Assembly 10 $893.97 $8,939.70

PNEUMATICSYSTEM
1 Bus Set Air Tanks (Complete Sets) 10 5352.00 $3,520.00 2 Ea. Air Dryer 10 $400.66 $4,OQ6.60
3 Ea. Air Governor 10 $68.80 $688.00
4 Bus Set Prossure Redudng Valves 10 $28.80 $288.00
5 Bus Set Chack Valves 10 557.60 $576.00
6 Bus Set Brake Control Valve 10 546.40 5464.00
7 Bus Set Brake Pedal Valve 10 $134.54 $1,345.40
B Bus Set Quick Rafease Valve 10 $17.60 $176.00
9 Bus Set Parking Relay Valve 10 $57.60 $576 00
10 Bus Set Parking Control Valve 10 $46.4 $464.00
11 Bus Set Air Brake Tubing 10 3134.54 $1,345 40
12 Bus Set Solenoid Valve Assembly 10 $17.60 $176.00
FUEL. SYSTEM
1 Bus Set Fuel Cylinder Assembly 2 $68,300.00 $136,600.00 2 Ea. Fill Manifold 2 $592.00 $1,184.00

PRICING FORM
LI~Cr.4TA PF2 - CNG a0'
Cc~NTRA~T NO. OP2~367 000 SCHEDULE A -SPARE PARTS
G/112.93 P•o. 2 or 4 Ce„~..a~ ti1aa. Ne.7

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION NO.7
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT j~0 U~ pESCRIPTION OF ITEM SCT I~NfT PRICE TOTAL PRIG
3 Bus Set Shut OH Valve Assembly 5 $440.OD $2,200.00
4 Bus Set PRD'S 10 5134.40 $1,344.00
5 Ea. High Fuel Pressure Regulator 20 $60Q.00 $12,000.00 6 Bus Set Defueiing Valves 5 X1,560.00 $7,800.00
7 Ea. LawlHigh Pressuro Filer Assembly 5 $7D4.00 $3,520.00 B Bus SQt Fuol Pressure Gauges 10 X88 00 $88Q.00
9 Bus Set Defueling Switches 5 $41.60 $208.00
10 Bus Set Manifold Shut Off Valve Assembly 10 $325.00 $3,25 00 11 Bus Set Solenoid Valve Assembly 10 $376.00 $3,760.00 12 Bus Set Fuel Line Assembly 10 $576.00 $5,760.00
13 Ea. Low Pressure Sensor 20 $144.00 $2,880.00
14 Ea. Proximity Switch ~ the Fuel Fill Door 20 X7.94 3158 80 15 Bus Set Fuel Line Assembly 5 $576.00 $2,680.00
16 Bus Set Vent Tubes 5 $137.60 $688.00
17 Ea. Control Harness 5 5240.00 $1,200.00
18 Ea. Proximity Switch (~ the Fast Fitl ReceptiGe 20 $7.94 $158.80 p00RS
1 Bus Sot Complete Base Plato and Operator Assembly 5 51,92.00 $9,600.00 2 Bus Set FronURear Turning Shaft Assembly 5 51,864 00 59,320.00 3 Bus Set Ooor Panels 5 56,387.00 531,935.00
4 Bus Set Door Glass 2 31,816.0 $3,632.00

BQDY INTERIOR
1 Bus Set InteriorAVA Sign Assembly 5 51,580.00 $7,900.00 2 Ee. Destination Sign Controller 2 X512.00 $1,024.00
3 Ea. Next Stop Sign 5 $256.00 $1,280.00
4 Bus Set Interior SpeakerAssembly 10 $192.00 $1,920 Q0 5 Ea. Microphone Hand Set 5 $92.80 $464.D0
6 Ea. VisorlSun Shede(s) Front 8 Sido 10 $316.80 $3,168 D0 7 Bus Set Access Panels 5 $960.00 54,800.00
D Bus Sot Light Covers 5 $916.80 $4,584.00
9 Bus SQt Modesty Panels 10 $880.00 $8,800.00
10 Bus Sot Ceiling Panels 10 51,472 A0 $14,720.00
11 E3us Set Side Wall Tnm Panel 10 $480.00 $4,BOOAO
12 Bus Set Floor Covering 5 $2.470 OQ $12,350,00
13 Bus Set WheelchairSecurement Davices 5 $1,248.00 $6,240.00 14 Bus Set Passenger Seat 4 $34,087.00 $136,348.00
15 Bus Set Seat Track 2 5338 00 $776.00
18 Ea. Operator Seat 5 $2.680.00 $13,400.OD
17 Ea. Farebox Grabrail 4 $248 00 $992.00
1B Bus Set Manual Releaso Mechanism 6 X47.00 $282.00
19 Eus Set Passenger Hand StraA 10 $496.00 $4,960.00
20 Ea. HVAC Return Grill 5 $390.00 $1.950.00

BODY EXTERIOR
1 Bus Sat Passenger Windows 2 $14,186.40 $28,372.80
2 Bus Set Replacement Pass Side Window Glass (Knot bonded) 2 $4,560.00 $9,120.00 3 Bus Set Side Window Film or Guards 5 $1,847.00 $9,235.00 4 Bus Sot Windshield 3 $680.00 $2,040.00
5 Bus Set Operator Window 2 $1,139.68 $2,279.36
6 Bus Sot Access Door Set (exduding engine door and HVAC access door) 3 $2,180.00 $6,540.00 7 Ea. Engine Door 2 $623.00 $1,246.00
8 Ea. HVAC Rear Attic Door 2 $428.80 $857.60
9 Ea. Bike Rack 2 ;1,148 Q0 S2,296.00
10 Ea. Emergency Roof Hatch 2 $249.20 $498.40
11 Bus Set W+ndshield Wiper Assy 3 $766.9fi $2,300.88
12 Ea. Windsheild Washer Reservoir 2 $52.60 $105.60
13 Bus Sot Mirrors 4 $971.28 $3,685.12
14 Bus Set Bumper 3 $2,208.00 $6,624.00
15 Bus Set Mud Guards 3 $104.00 $312.00

PRICWG FORM
LACMTA PF2 - CNG 40'
CONT~2~CT NO. OP2E33G7~000 SCHEDULE A -SPARE PARTS
GA12 93 P•o• 3 e~ 4 Co~~..~o Mod. NoJ

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION NO.7
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT j1~0 ~ DE$CRIPTIpN OF ITEM AGY UNIT PRtC~ TOTAL PRICE
16 Ea. Head Lights 10 5742.00 $7,420.00
17 Bus Set Front Tum Signal 10 $54.40 5544.00
18 Bus Set Side Marker Lights 10 $128.00 $1,280.00
19 Bus Set Roar Door Lights 10 $64.00 $640.40
20 Bus Set Under Hood Hazard Lights 10 $11520 $1,152.00 21 Ea. License Plate Installation 5 $20.8 $104.00
22 Bus Set CNG Tank Cover Instaitation 4 53,800.00 $15,200.00 Exterior Trim (inGuding fender skirts, exit door Uim and trim pieces 23 Bus Set covering joints between body panels) 4 $1,387.00 $5,548.00

CLIMATECONTROL SYSTEM
1 Ea. Compressor 2 $6,800.00 $13,600.00
2 Ea. Controller 2 S300.00 3600.00
3 Ea. Evaporator 2 $6,300.00 $12,600.00
4 Ea. Condensor 2 5410.25 $820.50
5 Ea. Eilower Assembly 4 X555.00 $2,220.00
6 Ea. TheRnostat 2 555.79 $111.58
7 Ea. Marine Pump 3 $603.0 $1,809.00
Y~tiEE4CHAIR
1 Bus Set Ramp Assembly 3 $7,995.00 523,985.0
2 Bus Set Valve Assembly 2 $87.00 $174.00
3 Bus Set Electrical Harness 2 $348.40 $696 80
4 Ea. Ramp 2 57,995.00 $15,990.00
5 Ee. Controtior 2 $707.39 $1,414.76
6 Ee. Motor 3 $819.00 $2,457.00
pRAKES
1 Bus Set Pressure Switches (indude a!I for each Bus Set) 10 5585.00 $5,850.00 2 Bus Set Protection Valve 10 $84.00 5840.00
3 Bus Set Brake Air Chamber 10 $269.7D $2,697.00
4 Bus Set Brake Wear Indicator 5 5390.00 $1,950.00
5 Ea. A8S Electronic Control Unit 5 $388.50 $1.942.50
6 Ea. ABS Harness 2 $367.50 $735.00
7 Bus Set ABS Sensor 5 $295.50 51,477.50

MULTIPLEX CONTROLS SYSTEM
1 Ea. Event Data Recorder 2 $2,200.00 $4,400.00
2 Ea. DVR 2 $5,535.40 $11,070.60
3 E3us Set Complete Bus Wiring Harnesses 2 $21,071.15 $42,142.30 4 Bus Set Communication Module (Gateway Module) 10 S3,630.D0 $38,300.00 5 Bus Set Multiplex Module 10 X6,610.81 $66,108.10
6 Bus Set Wheels 5 52.660.00 $14,300.00
Total UnitPrice $SD1,724 21
TOTAL PARTS BUY S?_,203,?91 f,5
In U.S. Dollars Uslna Words:
iWO-MILLION T1,^✓O-'ril_INi)RCD TIIRCE TNOUSANU ONE HUNDRED NINETY O~iE DOLLARS ESIXTY-FIVE CANTS <J~Autho ze ~ nature Date

TONY WAYNE
Print Name
L~CMTA

PRICING FORM
PF2 • CNG 40'
CONTRACT NO. OP2~367.000 SCHEDULE A - SPf~RE PARTS
GA12.93 P•v• ~ ~~4 Co~c..e~Moa. NeJ

Metro
MAEL-034
Date: November 13, 2018
File Nos.:

Action Item(s):

CDRL:

Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509
Response Required: No
SUBJECT: EXECUTED CONTRACT MODIFICATION NO. 8
OP28367-000 40' LOW FLOOR CNG TRANSIT BUSES
Reference: MAEL-032; ELMA-045(R
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

If you have any questions, I can be reached at 213.922.7334 ore-mail at hernandezelCc~metro.net.

Sincerely,
~~~ .

Elizabeth Hernandez
Principal Contract Administrator
cc: Wayne Okubo
Kwesi Annan
CDRL NO.: n!a
Las Angeles County One Gateway Plaza zi3.9z~.x000 Tel
Metropolitan Trensportation Authority Los Angeles, CA 9oo~z-z95z metro,net DATE: November 13, 2018
MAEL-034

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 8
FOR: FORTY FOOT (40') LOW FLOOR CNG TRAN5IT BUSES
This Contract Modification No. 8 to Contract No.: OP28367-000 is made effective on the 26~' day of October 2018 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

W HEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018, Contract Modification No. 5 dated February 12, 2018, Contract Modification No. 6 dated April 23, 2018, and Contract Modification No. 7 dated October 3, 2018, (the "Existing Contract") and;
W HEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the parties as follows:

1. Change bus floor covering from RCA to Altro, applicable only to production buses no. 66 to 295 of the Base Buy, for an aggregate increase of $98,972, inclusive of applicable taxes, in the total Contract Price from $198,945,328 to $199,044,300, in accordance with the revised Pricing Forms as attached. Article IV COMPENSATION shall read as follows:

ARTICLE IV: COMPENSATION
A. Contract Price

1. In consideration of the Contractor's full performance of the Work, and in accordance with the terms of the Contract, Metro will pay the Contractor the Contract Price of S199,044,300 $~5~,945;3~ inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions.

Contract Options may be exercised unilaterally by LACMTA in accordance with Special Provisions Article SP-28, Options.

2. Revised Pricing Forms: PF 1, PF-1A and PF 2 as attached to this modification no. 8.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

Contract Modification No. 8 Page 1 of 2 Contract No.: OP28367-000 Issued: 10!30118 CA: EH

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 7 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC
By:
ignatu e
Type or Print Name
~/~//d'
Date

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
Philip A. Was~ingto
Chief Executive Offt~er
Director, Co~tfact Administration
11 ~gDate
Contract Modification No. 8 Page 2 of 2 Contract No.: OP28367-000 Issued: 10!30/18 CA: EH

GROUP
A
- UP
TO
600
4d'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
C
ontrac
t M
odification
No.:
8 r
—
--
-
Proposer:
i ELDORADO

NATIONAL
(CALIFORNIA),
lNC.

C
ontract
No.:

OP28367-000
C
ontract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

1.0 CONTRACT
FOR
295
BUSES
(B
ASE
BU
Y)
Taxable
No.
(~.

Description
of
Item
Unit
Price
Unit
Price
Total
Price
1 1a
22960 Lot
40'
Low
Floor
CNG
Buses
(Base
Buy)
from
PF-1A
Values
derived
from
PF-1A':
' 40'
Lo~v
Floor
CNG
Buses
(Base
Buy)
from
PF-1A
Manuals
(Base
Buy)
(TS

5.6.4)
S595
;335.02
5594,941.09
$2,281.50
S615
;075
5614
:681Lump
Sum
S140,852,150S40
:568
;948
$23,400.00
1b
295
Vehicle
Delivery
Charge
for
Base
Buy
Value
of
ail
taxable
delivery
charges
per
bus*':

X275.00
$81,125.00
1c
229
Tax
(Base
Buy
Production
Bus
67 - 295)

9.75%
S5B
;045.16
S13,294,624
1d
66 Tax
(Base
Buy
Production
Bus
1-66)

9.75%
S58,006.76
53,828,446
2 2
Pilot
Buses
Retrofit
with
Rear
Axle
Upgrade
$8,600
$17,201
2a
Tax

9.75%
$838.55
X1,677
3 Lot
Reserved
4 Lot
Reserved
5 Lot
Reserved
6 Lot
Reserved
7 Lot
Performance
Bond
(Base
Buy)
Lump
Sum
51 19,336.0
0 8
1,000
Total
Training
Hours
for
Base
Buy'**
$175,000.00
8a
900
Contractor
(Proposer/Prime
)
Base
Buy
$175.00
X157,500.00
8b
100
Subcontractor/Supplier
Base
Buy
5175.00
517,500.00
9 1
System
Management
Tool
for
use
at
up
to
(13)
MTA
Operating
Divisions
per
TS

86.1 X74,930.00
$74,930.00
10a
15 Special
Towing
Equipment
(TS
25)
$386.00
$5,790.00
10b
Tax

9.75%
$37.64
$564.53
11a
2 Rear
Recovery
DeviceslTie
Downs
(TS
25)
$505.00
$1,010.00
11 b
Tax

9.75°/a
X49.24
$98.48

1.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses
(Sum
of
Items
"1"
through
"11
b")
to
be
the
BASIS
for
Price
Proposal
evaluation
In
U.S.

Dollars
Using
Words:

ONE

HUNDRED
NINETY
NINE

MILLION
FORTY
FOUR

THOUSAND
THREE

HUNDRED

DOLLARS
(n
U.S.

Dollars
Using
Figures:

X199,044,300
LACMTA

PRICING
FORM

CONTRACT
NO.

OP28367-000
PF1
- CNG
40'
GA12-93
Page
1 of
7 Contract
Mod.

No.
8 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
M
odification
No.:
8 —
-
—
----
Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title;
FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
NOTE
Unit
Prices
from
Mod.

No.
7 for
Production
Buses
1 - 65
* Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
** Input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
**'
Training
Hours
for
Base
Buy
are
only
estimates
and
not
a
guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount
LAC
MTA

CONTRACT
NO.

OP28367-000
GA12-93
Page
2 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
8 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
C
ontract
Modification
No.:
8 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

C
ontract
No.:

OP28367-000
C
ontract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

2.0 CONTRACT
FOR
150
UP
TO
305
BUSES
(OPTION
BUY)
Taxable
No.

Cam
.

Description
of
Item
Unit
Price
Unit
Price
Total
Price
10 305
40'
Low
Floor
CNG
Buses
(Option
Buy)
from
PF-1A
for
150
to
305
vehicles"
5595
;335.02
5615,075
S187,597,841.45
10a
Lot
Manuals
(Option
Buy)
(TS

5.6.4)*'*
$2,281.50
Lump
Sum
523,400.00
10b
305
Vehicle
Delivery
Charge
for
Option
Buy
Value
of
all
taxable
delivery
charges
per
bus":
$0.00
$275.00S58,045.16
$83,875.00
10c
Tax
(Option
Buy)

9.75%
517,706,056.66
11 Reserved
$
$
12 Lot
Performance
Bond
for
Option
Buy
'*'
Lump
Sum
$123,421.00
13 500
Total
Training
Hours
for
Option
Buy**'*
$87,500.00
13a
450
Contractor
(Proposer/Prime)
Option
Buy
5175.00
$78,750.00
13b
50 Subcontractor/Supplier
Option
Buy
S175.00
$8,750.00
14 Reserved
$
~
Z.0
Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
(Sum
of
Items
"10"
through
"14")
to
be
th
e
BASIS
for
Price
Proposal
evaluation
TWO
-HUNDRED
FIVE

MILLION
EIGHT

HUNDRED
TWO

THOUSAND
FIVE

HUNDRED

SEVENTY
In
U.S.

Dollars
Using
Wards:

ONEDOLLARS
In
U.S.

Dollars
Using
Figures:
$205,622,094
NOTE
'Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
"
Input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
'
:`
For
proposal
purposes
only,
Manuals
and
Bond
prices
are
for
all
305
bus
Options
exercised.

Actual
cost
will
depend
on
Option
quantity
ordered.
"""'
Training
Hours
for
Option
Buy
are
only
estimates
and
not
a
guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
3 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
8 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.
:
8 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title;
FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

3.0 No.

OPTIONAL

VEHICLE

CONFIGURATION
~(
.

Descriation
of
Item
Unit
Price
Total
Price
15 1
3 ADA
Securement
Configuration
TS

81.5 (Total
15a
-15d)
$6,370.00
15a
Direct
Materials/Equipment
X5,750.00
15b
Labor
Installation
Costs
$620.00
15c
Non
Recurring
Cost
$0.00
15d
Other
Costs
(Identify)
$0.00
16 1
4 ADA
Securement
Configuration
TS

81.5 (Total
16a
-16d)
$10,170.00
16a
Direct
Materials/Equipment
$9,150.00
16b
Labor
Installation
Costs
X1,020.00
16c
Non
Recurring
Cost
$0.00
16d
Other
Costs
(Identify)
$0.00
17 600
Reserved*""*
17a 17b
295305
ReservedReserved
18 600
25 -Year
Certified
CNG
Tanks
$522,000.00
1 Sa 18b
295305
25 Yr
Certified
CNG
Tanks
far
Base
Buy
25 Yr
Certified
CNG
Tanks
for
Option
Buy
for
150
up
to
305
vehicles
X256,650.00
$870.00
_,'
X265,350.00
$870.00
~
19 600
Complete
Automatic
Passenger
Counter
System
TS

86.3 (Total
19a
-19h)
$2,757,600.00
19a
295
Direct
Materials/Equipment
for
Base
Buy
APC
$4,136.00
19b
295
Labor
Installation
Costs
for
Base
Buy
APC
X460.00~
19c
295
Non
Recurring
Cost
for
Base
Buy
APC
LAC
MTA

CONTRACT
NO.

OP28367-000
GA12-93
Page
4 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
8 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
C
ontract
Modification
No.:
8 Proposer.
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

C
ontract
No.:

OP28367-000
C
ontract
Title;
FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
19d
295
Other
Costs
(Identify)
for
Base
Buy
APC
$
Total
for
Base
Buy
APC
X1,355,820.00
$4,596.00
19e
305
Direct
Materials/Equipment
far
Option
Buy
APC
for
150
up
to
305
vehicles
$4,136.00
19f
305
Labor
Installation
Costs
far
Option
Buy
APC
for
150
up
to
305
vehicles
X460.00
19g
305
Non
Recumng
Cost
for
Option
Buy
APC
for
150
up
to
305
vehicles
$
19h
3Q5
Other
Costs
(Identify)
for
Option
Buy
APC
for
150
up
to
305
vehicles
~ S
Total
for
Option
Buy
APC
far
150
up
to
305
vehicles
X1,401,780.00
$4,596.00
20 600
Enhanced
360
degree
Camera
System
TS

86.1 (Total
20a
- 2010
$579,000.00
20a
295
Direct
Mate
rials/Equipment
for
Base
Buy
Enhanced
Camera
System
5869.00
20b
295
Labor
Installation
Costs
for
Base
Buy
Enhanced
Camera
System
S9fi.00
20c
295
Non
Recurring
Cost
for
Base
Buy
Enhanced
Camera
System
$
20d
295
Other
Costs
(Identify)
for
Base
Buy
Enhanced
Camera
System
S
Total
for
Base
Buy
Enhanced
Camera
System
$284,675.00
$965.00
2Qe
305
Direct
Materials/Equipment
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$869.00
2Qf
305
Labor
Installation
Costs
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$9
fi.00
20g
305
Non
Recumng
Cost
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
S
20h
305
Other
Costs
(Identify)
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$
Total
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$294,325.00
5965.00
21 21a 21 b
600295 305
USB
Ports
for
Passenger
Charging
Only
USB
Ports
for
Passenger
Charging
Only
for
Base
Buy
USB
Ports
for
Passenger
Charging
Only
for
Option
Buy
for
150
up
to
305
vehicles
X141,600.00X146,400.00
$288,000.00
5480.005480.0
0 22
600
Optional
Wireless
Stop
Request
Switches
(Bus
set)
$291,000.00
22a
295
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Base
Buy
$143,075.00
5485.00

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
5 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.

S

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modification
No.:
8 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OPZ8367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
22b
305
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Option
Buy
for
150
up
to
305
vehicles
$147,925.00
5485.00
23 600
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
$2,070,000.00
23a
295
Optional
Full
Calar
Destination
Sign
Sets
(TS

86.3)
for
Base
Buy
X1,017,750.00
53,450.00
23b
305
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Option
Buy
for
150
up
to
305
vehicles
$1,052,250.00
$3,450.00
24 Lot
Spare
Parts
(From
Schedule
A,
Form
PF-2)
52 ;261,788.13
25 Lot
Special
Tools
(Schedule
B
Form
PF-3)
$7,710.00
26 Lot
Diagnostic
Test
Equipment
(Schedule
C,
Form
PF-
4)
$355,010.00
27 Lot
Training
Aids
(Schedule
D,
Form
PF-5)
$958,460.00

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
(Sum
of
Items
"15
through
27")
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation.

In
U.S.

Dollars
Using
Words:

TEN
-MILLION
ONE

HUNDRED
SEEN

THOUSAND
ONE

HUNDRED
EIGHT

DOLLARS
to
U.S.

Dollars
Using
Figures:
$10,107,108
****
Proposer
shall
provide
base
Low
Nox
Engine
for
each
bus
with
the
following
Emission
Levels:

ISLG
engine
is
not
the
base
engine
requirement.

Low
Nox
engine
is
the
base
requirement
and
therefore
no
longer
an
option.

Oxides
of
Nitrogen
(NOx)
Grams
per
brake
horsepower
-hour
Particulate
Matter
(PM)
grams
er brake
horse
ower
hour

0.02 0.01

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
6 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
8 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contra
ct
Modi
fication
No.:
8 Proposer:
~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

4.0 CONTRACT
FOR
BASE
BUY,
OPTION
BUY,
AND

OPTIONALVEHICLE

CONFIGURATION
No.
otv.

Descriation
of
Item
Total
Price
~

1.0 Totai
Price
for

CONTRACT
for
295
Base
Buy
Buses
to
be
the
BASIS
for
Price
Proposal
evaluation
$199,044,300

2.0 Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
to
be
the
BASIS
for
Price
Pro
osal
evaluation
$205,622,094

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation
X10,107,108

4.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses,
for
150
up
to
305
Option
Buy
Buses,
and
Optional
Vehicle
Configuration
for
Optional
Equipment
combined
to
be
the
overall
BASIS
for
Price
Proposal
evaluation
I
~ FOUR
-HUNDRED

FOURTEEN

MILLION
SEVEN

HUNDRED

SEVENTY
THREE

THOUSAND
FIVE
In
U.S.

Dollars
Usinq
Words:

HUNDRED
TWO

DOLLARS
~
In
U.S.

Dollars
Using
Figures:
~ $414,773,502
~ ~
~~
J/~
(Signature
f Perso
Executing
Proposal)
Date
;TONY
WAYNE
VICE

PRESIDENT
~

GENERAL
MANAGE
Type
Name,
Title
LAC
MTA

CONTRACT
NO.

OP28367-000
GA12-93
Page
7 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
e

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1A
(CNG
- 40')

SUBSYSTEM

EQUIPMENT

CONTRACT

MODIFICATION
NO.
8 Contractor:

ELDORADO

NATIONAL
(CALIFORNIA),
INC
Contract
No.:

OP28367-000
BASE
BUY
NO.

DESCRIPTION
OF
ITEM
1 Purchased
Subsystem
Equipment
(Items

1.1 through

1.99)
**

1.1 TS

9. Propulsion
Power
Assembly
(PPA)***

1.2 TS

9. Engine

1.3 TS

10. Cooling
System

1.4 TS

18. Fuel
System

1.5 TS

31. Suspension

1.6 TS

33. Steering
System

1.7 TS

37. Brakes

1.8 TS

39. Pneumatic
System

1.9 TS

42. Charging
System

1.10 TS

44. Multiplex
Control
System

1.11 TS

54. HVAC
Climate
Control
System

1.12 TS

78. Passenger
Seats

1.13 TS
8Q.

Doors

1.14 TS

81. Accessibility
Provisions

1.15 TS

86. Communications

1.16 TS
11 Transmission

1.17 TS

78.1 USB
Passenger
Charging
Port

1.18 TS85.1
Wirelesss
Stop
Request
Button

1.19 TS

86.3 Matrix
APC

1.99 TS
34 Meritor
Rear
Axle
Upgrade
All other
bus
subsystem
equipment
not
included
above
TOTAL
CNG
BUS
PRICE

Production
Bus
1 - 66
Add
Altro
Flooring
Production
Bus
67 - 295
*
Transfer
Total
CNG
Bus
Price
to
Contract
Price
Summary
Form
(PF-1
-Unit
Price
column,
line
Item
1 -Base
Buy
$18,
372
$60,324$12,650$68,300$19,950$4,950$3,260$6,850$36,800$24,200$29,450$28,955$14,830$19,740$3,244$14,261$480$485$4,596$1,040$241, 944
'
$614,681$393.80$615,075
Notes:

1. *'
Price
shall
include
design,
engineering,
manufacturing/assembly,
testing,
shipping,
profit
and
other
associated
costs.

Price
for
each
subsystem
equipment
shall
include
all
applicable
apparatus.

2. Price
for
line
Item
Nos.
1a-27
in
the

CONTRACT
PRICE
SUMMARY(Form
PF-1)
shall
not
be
included
in
computing
price
of
any
of
the
line
items
above.

3. '*'
PPA
unit
price
for
line
item

1.1 excludes
prices
for
items

1.2 through

1.99 Page
1 of
2 Pricing
Form
PF1A
- CNG
40'

SUBSYSTEM

EQUIPMENT
Contract
Mod.

No.8

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1A
(CNG
- 40')

SUBSYSTEM

EQUIPMENT

CONTRACT

MODIFICATION
NO.
8 NO.

DESCRIPTION
OF
ITEM
2 Purchased
Subsystem
Equipment
(Items

2.1 through

2.99)
"*

2.1 TS

9. Propulsion
Power
Assembly
(PPA)"*

2.2 TS

9. Engine

2.3 TS

10. Cooling
System

2.4 TS

18. Fuel
System

2.5 TS

31. Suspension

2.6 TS

33. Steering
System

2.7 TS

37. Brakes

2.8 TS

39. Pneumatic
System

2.9 TS

42. Charging
System

2.10 TS

44. Multiplex
Control
System

2.11 TS

54. HVAC
Climate
Control
System

2.12 TS

78. Passenger
Seats

2.13 TS

80. Doors

2.14 TS

81. Accessibility
Provisions

2.15 TS

86. Communications

2.16 TS
11 Transmission

2.17 TS

78.1 USB
Passenger
Charging
Port

2.18 TS85.1
Wirelesss
Stop
Request
Button

2.19 TS

86.3 Matrix
APC

1.99 TS
34 Meritor
Rear
Axle
Upgrade
$18,372$60,324$12,650$68,300$19,950$4,950$3,260$6,850$36,800$24,200$29,450$28,955$14,830$19,740$3,244$14,261$480$485$4,596$1,040$242,338 TOTAL
CNG
BUS
PRICE
OPTION

QUANTITY
'X615,075
*Transfer
Total
CNG
Bus
Price
to
Contract
Price
Summary
Form
(PF-1
-Unit
Price
column,
-line
item
10 -Option
Buy)
Notes:

1. '"'
Price
shall
include
design,
engineering,
manufacturing/assembly,
testing,
shipping,
profit
and
other
associated
costs.

Price
for
each
subsystem
equipment
shall
include
all
applicable
apparatus.

2. Price
for
line
Item
Nos.
1-9
and
10a-27
in
the

CONTRACT
PRICE
SUMMARY(Form
PF-1)
shall
not
be
included
in
computing
price
of
any
of
the
line
items
above.

3. `*'
PPA
unit
price
for
line
item

2.1 excludes
prices
for
items

2.2 through

2.99 ~

~~~~~
(S'
nature
Person
Executing
Proposal)
Date
TONY
WAYNE
NICE

PRESIDENT
&GENERAL

MANAGER
Type
Name,
Title
Page
2 of
2 Pricing
Form
PF1A
- CNG
40'

SUBSYSTEM

ECIUIPMENT
Contract
Mod.

No.8

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION NO. 8
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT ~O ~1 I pESCRIPTION OF iTEM g~ U~lIT PRICE TOTAL PRICE

LOW NOX ENGINE
1 Ea. Propulsion Pawer Assembly (See Definition in SP-1) 3 586,270.Oa $258,810.00 2 Ea. Air Compressor 5 56,760.00 $33,800.00
3 Ea. Turbo 3 $1,982.00 $5,946.00
4 Ea. EGR Cooler 20 $1,110.47 $22,209.40
5 Ea. EGR Valve 10 $610.68 $6,106.80
6 Ea. Delta P Sonsor 10 5347.66 $3,476.60
7 Ea. Mass. Air Flow Sensor 10 $1,067.56 $10,675 60
8 Ea. Oxygen Sensor 20 $223 61 $4,472.20
9 Ea. Catalyst 5 $3,574.95 $17,874.75
10 Ee. Cylinder Head 5 $4,513.81 $22,569.5
11 Ea. Pistons Kits 60 $325.00 $19,500.00
12 Bus Set Rod Bearings 10 $64.00 5640.00
13 Bus Sot Main Bearing 10 $219.27 $2,192.70
14 Ea. Liners 60 5191.87 $11,512.20
15 Ea. Head Gasket 5 5428.75 $2.143.75
16 Ea. Uppar Gasket Set 5 $844.99 54,224.95
17 Ea. Oil Pan Gasket 20 $133.60 52,672.00
18 Ea. Stiffener Plate Gasket 20 $92.85 $1,857.Q0
19 Ea. Oil Pan 5 $505.51 $2,527.55
20 Ea. Throttle Actuator 5 $574.16 $2,870.60
21 Ea. Fuel Control Valve 10 $1,429.19 $14,291.90
22 Ea. Ignition Control Module 10 51,648 45 $16,484.50
23 Ea. Ignition Coils 120 $175.23 $21,027.60
24 Ea. Engine Homess 5 $1,493.62 $7,469.10
25 Ea. Ignition Hemess 10 $167.53 $1,675.30
26 Ea. Oil Cooler 5 $179.73 $898.85
27 Ee. Lube Pump 5 $275.51 51,377.55
28 Ea. Front Crank Seal 10 $30.54 $305.40
29 Ea. Rear Seal 10 $28.65 5286 50
30 Ea. Water Pump 10 $175.03 $1,750.30
31 Ea. Vibration Damper 10 $344.21 $3,442.10
32 Ea. Belt Tensioner (If applicable) 20 $145.47 $2,909.40 33 Ea. CaolantTermperaturo Sensor 20 $11.21 $224.20
34 Ea. Oil Pressure Sensor 10 $98.10 $991.00
35 Ea Fuel Pressure Sensor 10 3144.34 $1,443.40
36 Ea. Low Fuel Pressuro Regulator 10 51,222.22 312,222.20 37 Ea. Engine Cradle 5 X1,420.00 $7,100.00
38 Ea. Befit Guard 5 $358.80 $1,794.00
39 Ea. Complete Engine Package (See deftnition in TS-2) 4 566,430.00 $265,720.00 40 Dus Set Spark Plugs 15 342.02 $630.30
41 Bus Set Adapta~on Kit (Frig to Trans) 3 $1,066.00 53,198.00 4Z Ea. PPA Doilies 8 $685.00 $5,480.00

COOLING SYSTEM
1 Ee. Radiator Packages (Soo definition in TS-2) 5 $7,715.00 X39,575.00 2 Ea. Thermal Management Controllers 5 3598.32 X2,991.60 3 Bus Sot Fan Resistors 20 $48.60 $972.OD
4 Dus Set CAN Interface Cables 5 $101.25 $506.25
5 Ea. Fan Reversal LED Panel 5 $593.39 $2,66.95
6 Ea. Fan Assembly 30 $40.66 $1,219.60
7 Ea. Coolant Reservoir 10 $556.20 $5,5fi2.00
8 Ea. Transmission Cooler 10 $648,00 $6,480.00
9 Bus Set Pressuro Reliof Valve ZO $23.85 $477.00
10 Ea. Radiator Cap 30 $5.27 $158.10
11 Ea. Coolant Overflow Tank 10 $36.29 $362.90
Ll~CMTA
PRICING FOh'M
PF2 - GNG 40'
CONTRACT N0. OP28367 000 SCHEDULE A -SPARE PARTS
Gn12.93 P.o. 1 e~4 Co~a.ee Mee. Ne.E3

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION NO.8
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT j~0 U ~J DE$CRIPTIQN OF ITEM g~ UNIT PRICE TOTAL, PRICE

CHARGINGSYSTEM
1 Ea. Alternator 10 59,750.00 597,500.00
2 Ea. Voltage Regulators 10 $351.00 $3,510.00
3 Ea. Batteries 40 $203.77 $8,150.80
4 Ea. Battery Equitizer 20 $418.50 $8,370.00
5 Ea. Battery Disconnect 10 $31.82 5318.20
6 Ea. Battery Separator 5 $297.00 $1,485.00
7 Ea. Power Distribution Panel in Battery Compartment 5 $267.30 $1,336.50 8 Ea. Low Voltage Disconnect 10 $44.55 $445.50
9 Ea. Cirr.~it Braaker 80A 20 $31.59 $631.60
10 Ea. Circuit EreakQr 100A 20 $39.t5 5783.00
11 Ea. Circuit Breaker 120A or 130A, whichever applies 20 $49.95 $999.00 12 Bus Set Fuse and Circuit Broaker Panels 5 $310.50 $1,552.50

SUSPENSION
1 Bus Set Air Ride Beams 10 $2,310.00 $23,100.00
2 Bus Set Air Bags 20 $672.00 $13,440.00
3 Ea. Front Axle 10 $4,879.85 $48,798.50
4 Ea. Rear Axle 10 59,721.86 $97,218.60
5 Bus Set Radius Rods 5 5412.80 $2,064.00
6 Bus Set Shocks 10 $383.68 $3,836.80
7 Bus Set Leveling Valve Front 10 5191.81 51,918.10
B Bus Set Laveling Valve Rear 10 $191.81 $1,918.10
pRIV~
1 TRAIN
Ea. Transmission 5 Si :,~G1 Or 571,35 oC
2 Ea. TCM Programmed 5 $611.00 $3,055.00
3 Ea. Adaptation Kit (Trans to Eng) 2 $1,066.00 $2,132.00 4 Ea. Drivo Shaft 10 $544.00 $5,440.00
5 Ea. Differential 15 $6,972.00 $104,580.00

STEERINGSYSTEM
1 Bus Set Steering Gear and Linkaga 10 $1,172.50 511,725.00 2 Ea. Steering Column 10 $596.77 $5,967.70
3 Ea. Steering Shaft 10 5135.30 $1,353 00
4 Ea. Steering Box Assembly 10 $277.78 $2,777.60
5 Ea. Power Steering Gear Assembly 10 $893.97 $8,939.70

PNEUMATICSYSTEM
1 Bus Sat Air Tanks (Complete Sets) 10 $352.00 53,520.00 2 Ea. Air Dryer 10 5400.66 $4,OQ6.60
3 Ea. Air Governor 10 $68.80 5688.00
4 Bus Set Pressure Reduang Valves 10 S28 80 S288.00
5 Bus Set Check Valvas 1q $57.60 $576.00
6 Bus Set Brake Control Valve 10 Sas.ao $464.00
7 Bus Set Brake Pedal Valve 10 $134.54 $1,345.4D
8 Bus Sot Quick Ralease Valve 10 517.60 $176.00
9 Bus Set Parking Relay Valve 10 $57.60 $576.00
10 Eus Set Parking Control Valve 10 $46.40 $464.00
11 Bus Set Air Brako Tubing 10 $134.54 $1,345.40
12 Bus Set Solonoid Volve Assembly 10 517.60 $176.00
FUEL. SYSTEM
1 Bus Set Fuel Cylinder Assembly 2 $68,300.Oa 5136,600.00 2 Ea. Fiil Manifold 2 $592.00 $1,184.00
PRICING FORP.1
LAC MTA PF2 - CNG 40'
CONTRACT N0. QP2~367.000 SCHEDULE A -SPARE PARTS
Gl~12.93 P.o• 2 0, 4 Co„~..<< Mea. Ne.~

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION NO.8
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT ~IOj ~lf LT AESCRIPTION OF ITEM ~ UNfT PRICE TOTAL PRIG 3 Bus Set Shut ON Vetve Assembly 5 $440.00 $2,204.00
4 Bus Set PRD'S 10 $134.40 $1,344.00
5 Ea. High Fuel Pressure Regulator 20 $600.00 512,000.00 6 Bus SQt Defueling Valvos 5 $1,560.00 $7,800.00
7 Ea. LowlHigh Pressure Filer Assembly 5 $704.00 $3,520.00 8 Bus Sot Fuel Pressure Gauges 10 $88.00 $880.00
9 Bus Set Defuel(ng Switches 5 $41.60 $208,00
10 Bus Set Manifold Shut Off Valve Assembly 10 5325.00 $3,250.00 11 Bus Set Solenoid Valve Assemb~y 10 $376.00 $3,760.00 12 Bus Set Fuel Line Assembly 10 $576.00 $5,760.60
13 Ea. Low Pressure Sensor 20 5144.00 $2,680.00
14 Ea. Proximity Switch ~ the Fuel Fill Door 20 $7.94 $158.80 15 Bus Set Fuel Line Assembly 5 5576.00 $2,880.00
16 Bus Set Vent Tubes 5 5137.60 $688.00
17 Ea. Control Harness 5 5240.00 $1,240.00
18 Ea. Proximity Switch (8~ the Fast Fill ReceptiGe 20 $7.94 $158.80 DOORS
1 Bus Set Complete Baso Plate and Operator Assembly 5 $1,920.00 $9,600 00 2 Bus Set FronURearTum~ng Shaft Assembly 5 X1,864 00 $9,320.00 3 Bus Set Door Panels 5 $6,387.00 531,935.00
4 Bus Set Door Glass 2 $1,816.00 $3,632.00

BODY INTERIOR
1 Bus Set InterforAVA Sign Assembly 5 $1,580.00 $7,900.00 2 Ea. Destination Sign Controller 2 5512.00 51,024.00
3 Ea. Next Stop Sign 5 $256.00 $1,280.00
4 Bus Sot InteriarSpeakerAssembly 10 $192.00 $1,920.00
5 Ea. Microphone Hand Set 5 X92.80 $464.00
6 Ea. Visor/Sun Shades) Front 8 5fdo 10 $316.80 $3,168.00 7 Bus Set Access Panels 5 $960.00 $4,800.00
B Bus Sot Light Covers 5 5916.80 $4,584.00
9 Bus Sot Modesty Panels 10 $880.00 $8,800.00
10 Bus Set Coiling Panels 10 51,472.00 $14,720.00
11 Bus Set Side Wall Trim Panel 10 $480.00 $4,800.00
12 Bus Sot Floor Covering 5 52,637.8 513,187.90
13 Bus Set Wheelchair Securement Devices 5 $1,248.00 $6.240.00 14 bus Set Passenger Seat 4 $34,087.00 $136,348.OD
15 Bus Sot Seat Track 2 $388.00 $776.00
16 Ea, Operator Seat 5 $2,680.00 $13,400.OD
17 Ea. Farebox Grabrail 4 $248.00 $892.00
18 Bus Set Manual Refosso Mechanism 8 $47.00 $282.00
19 Bus Set Passenger Nand Strop 10 5496.00 $4,960.00
20 Ea. HVAC Return Gnll 5 X390.00 $1,95Q00

BODY EXTERIOR
1 Bus Set Passenger Windows 2 $14,186 4~ $28,372.60
2 E3us Set Replacement Pass Slde Window Glass (if not bonded) 2 54,560.00 $9,120.00 3 Bus Set Side Window Film or Guards 5 $1,847.00 $9,235.00 4 Bus Set Windshield 3 5680.00 $2,040.00
5 Bus Set Operator Windrnv 2 51,139.68 52,279.36
6 Bus Sot Access Door Set (exduding engine door end HVAC access door) 3 52,180.00 56,54D.00 7 Ea. Engine Door 2 $623.00 $1,246.00
8 Ea. HVAC Rear Attic Door 2 $428.80 5857.60
9 Ea. Bike Rack 2 51,149 34 52,296 68
10 Ea Emergency Roof Hatch 2 $249.20 $498.40
11 Bus Set Windshield WiperAssy. 3 $766.9fi 32,300.88
12 Ea. Windsheild Washer Reservoir 2 552.80 $105.60
13 Bus Sat Mirmrs 4 $971.28 $3,885.12
14 Bus Set Bumper 3 $2,208.00 $6,624.00
15 Bus Sot Mud Guarcls 3 $104.00 $312.00
LACMTA

PRICING FORM
PF2 GNG 40'
CONTRACT NO. OP2f3367~000 SCHEDULE A • SPnRE PARTS
GA12•~J3 P.o. 3 ar4 ~:o..e..ee Moe. No.~

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-2 (CNG- 40') - SCHEDULE A OF PRICES SPARE PARTS (OPTIONAL) CONTRACT MODIFICATION N0. 8
CONTRACTOR: ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT ~10, ~ DESCRIPTION OF ITEM Q~ UNtT PRICE TOTAL PRIG
16 Ea. Head Lights 10 ~742.Oo $7,420.00
17 Bus Set Front Tum Signal 10 $54 40 $544.00
18 Bus Set Side Marker Lights 10 $128.00 51,280.40
19 Bus Set Rear Door Lights 10 564.00 5640.00
20 Bus Set Under Hood Hazard Ligh;s 10 5115 20 $1,152.00 21 Ea. License Plate Installation 5 $20.80 5104.00
22 Bus Set CNG Tank Cover Installation 4 53,800.00 $15,2D0.00 Exterior Tnm (including fender skirts, oxit door tnm and tnm pieces 23 bus Set covering joints between body panels) 4 $1,387.00 55,548.00

CLIMATECONTROL SYSTEM
1 Ea. Compressor 2 56,800.00 $13,600.04
2 Ea. Controller 2 5300.00 5600.00
3 Ea. Evaporator 2 $6,300.00 $12,600.00
4 Ea. Condensor 2 $410.25 $820.50
5 Ea. Blower Assembly 4 5555.00 $2.220.00
6 Ea. Thermostat 2 $55.79 5111.58
7 Ea. Manna Pump 3 5603 00 $1,809.00
WHE~~.CHA1R
1 Bus Set Ramp Assembly 3 57,995.00 523,985.00
2 Bus Set Valve Assembly 2 $87.00 $174.00
3 Bus Set Electrical Hamoss 2 $348.40 5696.80
4 Ea. Ramp 2 $7,995 00 $15,990.00
5 Ea. Controller 2 $707.38 $1,414.76
6 Ea. Motor 3 5819.00 52,457.00
BRAKES
1 Bus Set Pressuro Switches (indudo atl for oach Bus Set) 10 $585.00 $5,650.00 2 Bus Set Protection Valve 10 584.00 $840.00
3 Bus Set Brake Air Chamber 10 5269.70 $2,697.00
4 Bus Set Brake Wear Indicator 5 5390.00 $1,950.00
5 Ea. ABS Electronic Control Unit 5 $388.50 $1, 42.50
6 Ea. ABS Harness 2 $367.50 $735.00
7 Bus Set A~5 Sensor 5 $295.50 $1,477.50

MULTIPLEXCONTROLS SYSTEM
1 Ea. Event Data Recorder 2 52,200.00 $4,400.00
2 Ea. DVR 2 $5,535.40 $11,070.80
3 Bus Sat Complete Bus W+ring HamessQs 2 $21,071.15 $42,142.30 4 Bus Set Communication Module (Gateway Module) 10 $3,630.00 $36,300.00 5 Bus Set Multiplex Module 10 $6,610.81 $66,108.10
6 Bus Set Wheels 5 52,860.00 $14,300.00
Total Unit Price $507,667.92
TOTAL PARTS BUY 52,26~,~e
In U.S. Dollars Using Words:
iW0•MILLION 7W0•lil ~D ifIREE TIIOUSAND FOUR ffUNDRED f OR1Y FIVC DOLLARS & SIX1Y-f IVE CENTS ~ ~~~
uthorize igna ure Date

TONY WAYNE
Print Name

PRICING FORM
LnCMTn PF2 • CNG a0'
CONTRACT N0. OP2B367.000 SCHEDULE A -SPARE PARTS
Gl112.93 P•a• ~ ^~ 4 Co~~..« Moe. No.~

MAEL-037 Response Required: No
Date: December 7, 2018
File Nos.:

Action Item(s):

CDRL: n/a
Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509

SUBJECT: OP28367-000 40’ LOW FLOOR CNG TRANSIT BUSES
CONTRACT MODIFICATION NO.: 9

TRAINING AIDS

Reference: ELMA-045
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

Please call me at 213.922.7334 or e-mail at [email protected] if you have any questions.

Sincerely,

Elizabeth Hernandez
Principal Contract Administrator

Enclosure: Fully executed Contract Modification No. 9

cc: Kwesi Annan

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 9
FOR: FORTY FOOT (40') LOW FLOOR CNG TRANSIT BUSES
This Contract Modification No. 9 to Contract No.: OP28367-000 is made effective on the 5~' day of November 2018 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

W HEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018, Contract Modification No. 5 dated February 12, 2018, Contract Modification No. 6 dated April 23, 2018, Contract Modification No. 7 dated October 3, 2018, and Contract Modification No. 8 dated October 26, 2018 (the "Existing Contract") and; W HEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the patties as follows:

MTA to procure items from the Pricing Form, line 27 Training Aids (Schedule D Form PF-5), for an aggregate amount of $349,636, inclusive of applicable taxes.

Article IV COMPENSATION shall read as follows:

ARTICLE IV: COMPENSATION
A. Contract Price
In consideration of the Contractor's full performance of the Work, and in accordance with the terms of the Contract, Metro will pay the Contractor the Contract Price of $199,044,3Q0, inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions.

Contract Options may be exercised unilaterally by LACMTA in accordance with Special Provisions Article SP-28, Options.

Training Aids -Additionally, in consideration of the Contractor's full performance of the W ork, and in accordance with the terms of the Contract, Metro will pay the Contractor far line items under Pricing Form PF-5 Training Aids in the amount of $349,646 inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions, CP- 2 (H).
a. Ea. One complete running engine and transmission assembly, including cooling and fueling systems, mounted on a suitable roll around stand (TS 5.6.3.a)
Contract Modification No. 9 Page 1 of 2 Contract No.: OP26367-00~ Issued: 11!05!18 CA: EH

b. Ea. Anti-Lock Brake Board (TS 5.6.3.fl
c. Ea. Electric Air Conditioning Training Simulator Module (TS 5.6. 3.g) d. Ea. Video Security System (TS 5.6.3.i)
e. Ea. Multiplex Electrical Training Board (TS 5.6.3.k) f. Ea. Voith DIWA.6 transmission training cutaway (TS 5.6.3.b) Revised Pricing Forms: PF-1 and PF -5 as attached to this modification no. 9.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 9 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC.

By: mot.

Signatur
~ id Y ~-r.~'ay,.fc
Type or Print Name
~~~~~~
Date

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION
AUTHORITY f`
Philip A. Washingtq'n
Chief exec ti e Officer
By:Wayne I b
Director, Contract Administration
Date
Contract Modification No. 9 Page 2 of 2 Contract No.: OP28367-000 Issued: 11/05/18 CA: EH

GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Con
trac
t Modifica
tion
No.:
9 Proposer:
'~ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

1.0 CONTRACT
FOR
295
BUSES
(BASE
BUY)
Taxable
No.
(3ty.,
Description
of
Item
Unit
Price
Unit
Price
Total
Price
1 1 a
22966 Lot
40'
Low
Floor
CNG
Buses
(Base
Buy)
from
PF-1A
Values
derived
from
PF-1A':
' 40'
Lo~v
Floor
CNG
Buses
(Base
Buy)
from
PF-1A
Manuals
(Base
Buy)
(TS

5.6.4)
S595
;335.02
5594,941.09
$2,281.50
S615,0755614,681
Lump
Sum
S140,852,150S40
:568,948
$23,400.00
1b
295
Vehicle
Delivery
Charge
for
Base
Buy
Value
of
all
taxable
delivery
charges
per
bus`*:
$275.00
$81,125.00
1c
229
Tax
(Base
Buy
Production
Bus
67 - 295)

9.75%
S58,045.16
S13,294,624
ld
66 Tax
(Base
Buy
Production
Bus
1-66)

9.75%
558,006.76
S3,828,446
2 2
Pilot
Buses
Retrofit
with
Rear
Axle
Upgrade
$8,600
X17,201
2a
Tax

9.75%
X838.55
$1,677
3 Lot
Reserved
4 Lot
Reserved
5 Lot
Reserved
6 Lot
Reserved
7 Lot
Performance
Bond
(Base
Buy)
Lump
Sum
S119,336.00
8 1,000
Total
Training
Hours
for
Base
Buy***
$175,000.00
8a
9Q0
Contractor
(P~oposer/Prime)
Base
Buy
$175.00
5157,500.00
Sb
100
Subcontractor/Supplier
Base
Buy
5175.00
$17,500.00
9 1
System
Management
Tool
for
use
at
up
to
(13)
MTA
Operating
Divisions
per
TS

86.1 $74,930.00
$74,930.00
10a
15 Special
Towing
Equipment
(TS
25)
$386.00
$5,790.00
10b
Tax

9.75%
537.64
5564.53
11a
2 Rear
Recovery
Devices/Tie
Downs
(TS
25)
$505.00
$1,010.00
11b
Tax

9.75%
$49.24
X98.48

1.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses
(Sum
of
Items
"1"
through
"11
b")
to
be
the
BASIS
for
Price
Proposal
evaluation
In U.S.

Dollars
Using
Words:

ONE

HUNDRED
NIiVETY
NINE

MILLION
FORTY
FOUR

THOUSAND
THREE

HUNDRED

DOLLARS
In U.S.

Dollars
Using
Figures:
$199,044,300
LAC
MTA

CONTRACT
NO.

OP28367-000
GA12-93
Page
1 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contra
ct
M
odification
No.:
9 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title;
FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
NOTE
Unit
Prices
from
Mod.

No.
7 for
Production
Buses
1 - 65
Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
'
* Input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
""'
Training
Hours
for
Base
Buy
are
only
estimates
and
not
a guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount
LAC
MTA

CONTRACT
NO.

OP28367-000
GA12-93
Page
2 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modif
ication
No
.:
9 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

2.0 CONTRACT
FOR
150
UP
TO
305
BUSES
(OPTION
BUY)
Taxable
No.
f~.

Description
of
Item
Unit
Price
Unit
Price
Total
Price
10 305
40'
Low
Floor
CNG
Buses
(Option
Buy)
from
PF-1A
for
150
to
305
vehicles"
5595,335.02
5615,075
5187,597,841.45
10a
Lot
Manuals
(Option
Buy)
(TS

5.6.4)""
$2,281.50
Lump
Sum
IS23,400
.0
0 '~
10b
305
Vehicle
Delivery
Charge
for
Option
Buy
Value
of
all
taxable
delivery
charges
per
bus":

X0.00
$275.00
$83,875.00
10c
Tax
(Option
Buy
)

9.75%
S5B
;045.16
S17,706,056.66
11 Reserved
$
$
12 Lot
Performance
Bond
for
Option
Buv*"'
l umn
Sum
I~~~s
a~~
nn
13 500
Total
Training
Hours
for
Option
Buy;"'
$87,500.00
13a
450
Contractor
(ProposedPrime)
Option
Buy
S175.00
$78,750.00
13b
50 Subcontractor/Supplier
Option
Buy
X175.00
$8,750.00
14 Reserved
$
$

2.0 Total
Price
for

CONTRACT
for
150
Up
to
305
Option
Buy
Buses
(Sum
of
Items
"10"
through
"14")
to
be
the
BASIS
for
Price
Proposal
evaluation

TWO-I-IUNDRED
FIVE

MILLION
EIGHT

HUNDRED
TWO

THOUSAND
FIVE

FIUNDRED

SEVENTY
In
U.S.

Dollars
Usina
Words:

ONEDOLLARS
~
In
U.S.

Dollars
Using
Figures:
$205,622,094
~
NOTE
'Taxable
Unit
Price
is
the
Unit
Price
less

1.14 Accessibility
Provisions
on
PF-1A
;* input
the
taxable
portion
of
the
Delivery
Charge
under
the
Taxable
Unit
Price
column
and
the
total
Delivery
Charge
under
the
Unit
Price
column
'
*'
For
proposal
purposes
only,
Manuals
and
Bond
prices
are
for
all
305
bus
Options
exercised.

Actual
cost
will
depend
on
Option
quantity
ordered.
**'~
Training
Hours
for
Option
Buy
are
only
estimates
and
not
a guaranteed
level
of
effort.

The
total
for
this
Line
is
allot-to-Exceed
provisional
amount.

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
3 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Cont
ract
M
odifi
catio
n
No.:
9 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

3.0 No.

OPTIONAL

VEHICLE

CONFIGURATION
~(
.

Description
of
Item
Unit
Price
Total
Price
15 1
3 ADA
Securement
Configuration
TS

81.5 (Total
15a
-15d)
$6,370.00
15a
Direct
Materials/Equipment
$5,750.00
15b
Labor
Installation
Costs
$620.00
15c
Non
Recurring
Cost
$0.00
15d
Other
Costs
(Identify)
$0.00
16 16a
1 4
ADA
Securement
Configuration
TS

81.5 (Total
16a
-16d)
Direct
Materials/Equipment
59,150.00
$10,170.00
16b
Labor
Installation
Costs
$1,020.00
16c
Non
Recurring
Cost
$0.00
16d
Other
Costs
(Identify)
$0.00
17 600
Reserved"'~*
17a 17b
295305
ReservedReserved
18 600
25 -Year
Certified
CNG
Tanks
$522,000.00
18a 18b
295305
25 Yr
Certified
CNG
Tanks
for
Base
Buy
25 Yr
Certified
CNG
Tanks
for
Option
Buy
for
150
up
to
305
vehicles
X256,650.00
X870.00
X265,350.00
$870.00
19 600
Complete
Automatic
Passenger
Counter
System
TS

86.3 (Total
19a
-19h)
$2,757,600.00
19a
295
Direct
Materials/Equipment
for
Base
Buy
APC
$4,136.00
19b
295
Labor
Installation
Costs
for
Base
Buy
APC
$460.00
19c
Z95
Non
Recurring
Cost
for
Base
Buy
APC
$

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
4 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
C
ont
ract
M
odifi
ca
tion
No.:
9 Proposer:
' ELDORADO

NATIONAL
(CALIFORNIA),
INC.

C
ontract
No.:

OP28367-000
C
ontract
Title;
FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
19d
295
Other
Costs
(Identify)
for
Base
Buy
APC
I, ~
Total
for
Base
Buy
APC
$1,355,820.00
$4,596.00
19e
305
Direct
Materials/Equipment
for
Option
Buy
APC
for
150
up
to
305
vehicles
$4,136.00
19f
305
Labor
Installation
Costs
for
Option
Buy
APC
for
150
up
to
305
vehicles
$460.00
19g
305
Non
Recumng
Cost
for
Option
Buy
APC
for
150
up
to
305
vehicles
~
19h
305
Other
Costs
(Identifjr)
for
Option
Buy
APC
for
150
up
to
305
vehicles
$
Total
for
Option
Buy
APC
for
150
up
to
305
vehicles
$1,401
;780.00
X4,596.00
20 600
Enhanced
360
degree
Camera
System
TS

86.1 (Total
20a
- 20h)
$579,000.00
20a
295
Direct
Materials/Equipment
for
Base
Buy
Enhanced
Camera
System
5869.00
20b
295
Labor
Installation
Costs
for
Base
Buy
Enhanced
Camera
System
$96.00
20c
295
Non
Recurring
Cost
for
Base
Buy
Enhanced
Camera
System
$
20d
295
Other
Costs
(Identify)
for
Base
Buy
Enhanced
Camera
System
$
Total
for
Base
Buy
Enhanced
Camera
System
$284,675.00
$965.00
20e
305
Direct
Materials/Equipment
far
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$869.00
20f
305
Labor
Installation
Costs
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$9fi.00
20g
305
Non
Recum
ng
Cost
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$
20h
305
Other
Costs
(Identify)
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
$
Total
for
Option
Buy
Enhanced
Camera
System
for
150
up
to
305
vehicles
X294,325.00
$965.00
21 21a 21b
600295 305
USB
Ports
for
Passenger
Charging
Only
USB
Ports
for
Passenger
Cha
rging
Only
for
Base
Buy
USB
Ports
far
Passenger
Charging
Only
for
Option
Buy
for
150
up
to
305
vehicles
$141,600.00X146,400.00
$288,000.00
S480.00X480.00
22 600
Optional
Wireless
Stop
Request
Switches
(Bus
set)
X291,000.00
22a
295
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Base
Buy
X143,075.00
$485.00

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
5 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP
A
- UP
TO
600
40'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
M
odi
fication
No.:
9 Proposer:
~ ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Titie:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT
22b
305
Optional
Wireless
Stop
Request
Switches
(Bus
set)
for
Option
Buy
for
150
up
to
305
vehicles
5147,925.00
S48

5.00 23
600
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
$2,070,000.00
23a
295
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Base
Buy
X1,017,750.00
$3,450.00
23b
305
Optional
Full
Color
Destination
Sign
Sets
(TS

86.3)
for
Option
Buy
for
150
up
to
305
vehicles
$1,052,250.00
$3,450.00
24 Lot
Spare
Parts
(From
Schedule
A,
Farm
PF-2)
52 ;261
;788.13
25 Lot
Special
Tools
(Schedule
B
Form
PF-3)
$7,710.00
26 Lot
Diagnostic
Test
Equipment
(Schedule
C,
Form
PF-
4)
$355,010.00
27 Lot
Training
Aids
(Schedule
D,
Form
PF-5)
S989,385.00

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
(Sum
of
Items
"15
through
27")
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation.

TEN-M1LLlON
ONE

HUNDRED
THIRD
EIGHT

THOUSAND
ONE

HUNDRED
THIRTY
THREE
In
U.S.

Dollars
Using
Words:

DOLLARS
In
U.S.

Dollars
Using
Figures:
$10,138,033
****
Proposer
shall
provide
base
Low
Nox
Engine
for
each
bus
with
the
following
Emission
Levels:

ISLG
engine
is
not
the
base
engine
requirement.

Low
Nox
engine
is
the
base
requirement
and
therefore
no
longer
an
option.

Oxides
of
Nitrogen
(NOx)
Grams
per
brake
horsepower
-hour
Particulate
Matter
(PM)
grams
er brake
horse
ower
hour

0.02 0.01

LACMTACONTRACT
NO.

OP28367-000
GA12-93
Page
6 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP
A
- UP
TO
600
4d'
CNG
BUSES
FORM
PF-1
(CNG
- 40')
-CONTRACT
PRICE

SUMMARY
Contract
Modific
ation
No.:
9 Proposer:

ELDORADO

NATIONAL
(CALIFORNIA),
INC.

Contract
No.:

OP28367-000
Contract
Title:

FORTY
FOOT
(40')
LOW
FLOOR
CNG
BUS

PROCUREMENT

4.0 CONTRACT
FOR
BASE
BUY,
OPTION
BUY,
AND

OPTIONALVEHICLE

CONFIGURATION
No.
,(3ty.,
Description
of
Item
Total
Price

1.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses
to
be
the
BASIS
for
Price
Proposal
evaluation
$199,044,300

2.0 Total
Price
for

CONTRACT
for
150
U
to
305
Option
Buy
Buses
to
be
the
BASIS
for
Price
Proposal
evaluation
$205,622,094

3.0 Total
Price
for

OPTIONAL

VEHICLE

CONFIGURATION
for

OPTIONAL

EQUIPMENT
to
be
BASIS
for
Price
Proposal
evaluation
$10,138,033

4.0 Total
Price
for

CONTRACT
for
295
Base
Buy
Buses,
for
150
up
to
305
Option
Buy
Buses,
and
Optional
Vehicle
Configuration
for
Optional
Equipment
combined
to
be
the
overall
BASIS
for
Price
Proposal
evaluation
n U.S.

Dollars
Using
Words:
~
In
U.S.

Dollars
Using
Figures:
x$414,804,427
J ~
~G ~
l~
(Signature
f Pe
on
Executing
Proposal)
Date
'TONY
WAYNE
VICE

PRESIDENT
8~

GENERAL
MANAGE
FOUR
-HUNDRED

FOURTEEN

MILLION
EIGHT

HUNDRED
FOUR

THOUSAND
FOUR

HUNDRED
TWENTY
SEVEN

DOLLARS
Type
Name,
Title
LAC
MTA

CONTRACT
NO.

OP28367-000
GA12-93
Page
7 of
7 PRICING
FORM
PF1
- CNG
40'
Contract
Mod.

No.
9 GROUP A - UP TO 600 40' CNG BUSES
FORM PF-5 (CNG - 40')- SCHEDULE D OF PRICES TRAINING AIDS (OPTIONAL] CONTRACT MODIFICATION NO.9
Contractor ELDORADO NATIONAL (CALIFORNIA), INC.

Contract No.: OP28367-000
Contract Title: FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT NO. UNIT DESCRIPTION OF ITEM ,(QTY, UNIT PRICE TOTAL PRICE One complete running engine and transmission assembly, including cooling and fueling systems, mounted ona suitable roll around stand 1 Ea. (TS 5.6.3 a.) 1 5193,200.00 $193,200.00
Static Transmission Assembly Na4e—~#-~#~e-6~#fas~o~+~a#e~+~g-afl- issie~-vtst~al-~a~s~+ ':~ni'~:'
2 Ea. DIWA .6 transmission (TS 5.6.3 b.) 1 S30,925.00 S30,925.00 3 Ea. Complete Static Front Axle Assembly TS 5.6.3.c, 1 516,400.00 X16,400.00 4 Ea. Complete Static Rear Aide Assembly TS 5.6.3.d. 1 S18,500.00 X18,500.00 ATECH ELECTRICAL TRAINING BOARDS -General Electrical Training (TS 5.6.3 e.1 1 Kit GM Specialized Electronic Trainer 10 S2,100.00 $21,000.00 2 Kit GM Electronic Instructor's Guide (Books Only -Stages 1, 2, 8~ 3) 10 595.00 X950.00 3 Kit 4 Resistors 10 535.00 X350.00
4 Kit Dual Filament Light 10 546.00 $460.00
5 Kit Horn 10 5121.00 $1,210.00
6 Kit Blank Board 10 S24.00 $240.00

SYSTEM SIMULATION TRAINING BOARDS
1 Ea. Anti-Lock Brake/Air Brake Board (TS 5.6.3,f,) 1 532,000.00 $32,000.00 2 Ea. Electric Air Conditioning Training Simulator Module (TS 5.6.3.g.) 1 529,700.00 $29,700.00 3 Ea. Fire Suppression (TS 5.6.3.h.) 1 57,200.0 $7,200.00 4 Ea. Video Security System (TS 5.6.3.1.) 1 59,250.00 X9,250.00 5 Ea. Destination Sign (TS 5.6.3.].) 1 56,000.00 $6,000.00 6 Ea. Multiplex Electrical Training Board (TS 5.6.3.k.) 2 523,500.00 X47,000.00 E-EARNING INTERACTIVE TRAINING MEDIA (TS 5.6.3)
1 Hr. Module 1 6 X23,000.00 $138,000.00
2 Hr. Module 2 3 523,000.00 X69,000.00
3 Hr. Module 3 3 X23,000.00 $69,000.00
4 Hr. Module 4 2 523,000.00 X46,000.00
5 Hr. Module 5 4 523,000.00 $92,000.00
6 Hr. Module 6 2 523,000.00 $46,000.00
7 Hr. Module 7 2 523,000.00 $46,000.00
8 Hr. Module 8 1 523,000.00 $23,000.00
9 Hr. Module 9 1 523,000.00 X23,000.00
10 Hr. Module 10 1 523,000.00 X23,000.00
TOTAL BUY S989,385.00

PRICING FORM
LACMTA PF5 - CNG 40'
CONTRACT NO. OP28367-000 SCHEDULE D -TRAINING AIDS
GA12-93 Page 1 of 2 Contract Mod. No.9

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-5 (CNG - 40')- SCHEDULE D OF PRICES TRAINING AIDS (OPTIONAL) CONTRACT MODIFICATION NO. 9
In U.S. Dollars Using Words:

NINE-HUNDRED EIGHTY NINE THOUSAND THREE HUNDRED EIGHTY FIVE DOLLARS rued
~L/~~~
Date

TONY WAYNE
Print Name
LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 2 of 2

PRICING FORM
PF5 - CNG 40'

SCHEDULE D -TRAINING AIDS
Contract Mod. No.9

MAEL-043 Response Required: No
Date: January 18, 2019
File Nos.:

Action Item(s):

CDRL: n/a
Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509

SUBJECT: OP28367-000 40’ LOW FLOOR CNG TRANSIT BUSES
EXECUTED CONTRACT MODIFICATION NO.: 10
DISADVANTAGED WORKER (SP-38)

Reference: ELMA-053
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

Please call me at 213.922.7334 or e-mail at [email protected] if you have any questions.

Sincerely,

Elizabeth Hernandez
Principal Contract Administrator

Enclosure: Fully executed Contract Modification No. 10

cc: Kwesi Annan

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 10 FOR: FORTY FOOT (40'~ LOW FLOOR CNG TRANSIT BUSES
This Contract Modification No. 10 to Contract No.: OP28367-000 is made effective on the 9~' day of January 2019 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

W HEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018, Contract Modification No. 5 dated February 12, 2018, Contract Modification No. 6 dated April 23, 2018, Contract Modification No. 7 dated October 3, 2018, Contract Modification No. 8 dated October 26, 2018, and Contract Modification No. 9 dated November 5, 2018 (the "Existing Contract") and;
W HEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the parties as follows:

Modify Special Provisions SP-38 to read:

SP-38 LOCAL EMPLOYMENT PROGRAM
A. OBLIGATIONS OF CONTRACTOR
The Contractor shall implement the Local Employment Plan and Local Facility Capital Investments as approved by LACMTA and set forth in Exhibit C of the Contract. The Contractor's Local Employment Plan Commitment Value for Local Workers' Wages and Benefits is $2,506,164. The Contractor's Disadvantaged Worker Commitment Value for Disadvantaged Workers' wages and benefits is X250,616. The Contractor's Local Employment Plan Commitment Value for Local Facility Capital Investments is $3,470,000. The Contractor's Total Local Employment Plan Commitment Value is $5,976,164.

B. STATE OF CALIFORNIA NEW FULL TIME EQUIVALENT (FTE) POSITIONS &

LOCAL FACILITY CAPITAL INVESTMENTS
The State of California Resident FTE Positions included under the Contractor's Local Employment Plan shall:

1. Include only Contractor and SubcontractoNSupplier tyith State of California Resident employees who provide work hours directly allocable to the OP28367- 000 program in the State of California. Local Employees that also work on other projects may only be counted to the extent they perform work allocable to the Contract Modification No. 10 Page 1 of 4 Contract No.: OP28367-004 Issued: 01!09119 CA: EH

OP28367-000 Contract. A Local Employee may be expressed as a percentage of one FTE. To be considered eligible for California resident status, workers must maintain a physical presence in California, show intent to make California his or her permanent home, and be a U.S. Citizen or be granted and maintain an allowable immigration status prior to the Contract award date.

Evidence of intent to make California one's permanent home prior to Contract award may include, but is not limited to:
• California voter registration and voting in California elections • California driver's license
• California automobile registration
• California State income tax obligation on total income • Ownership of residential property or continuous occupancy or renting of an apartment on a lease basis where your personal belongings are kept • Active savings and/or checking accounts in a California bank • Immigration status with legal capacity to establish California residency • Maintaining a permanent military address and home of record in California • Military leave and earning statements showing California as legal residence.

2. Not include 1) current employees; 2) former, furloughed, and/or laid off employees who are separated from employment with the Contractor or Subcontractor/supplier (if applicable) on or after the date of LACMTA's Notice of Intent to Award Letter; 3) employees who will not be working on the project; 4) employees hired by the Contractor or Subcontractor to work on other projects to fill in or replace current employees reassigned to OP28367-000, 5) hours and costs that cannot be segregated and audited pursuant to internal Cost Accounting Systems of the Contractor or Subcontractors;6) Work conducted outside of the State of California; 7) W ork performed by Non-State of California residents.

The Local Facility Capital Investments included under the Contractor's Local Employment Plan shall:

1. Include only facility improvements, additions, upgrades, modifications, or major improvements (not ordinary repairs and maintenance) to existing facilities, leased facilities, or newly purchased facilities within the State of California. capital equipment investments may be included only if the equipment has an estimated useful life of at least two (2) years and is valued at $5,000 or more for any individual item. Proposers may include lease costs in their local facility capital investments only if ownership is shifted from the lessor to the lessee by the end of the lease period.

2. Not include: lease costs without a lease to own agreement, utility costs, minor repair costs, capital equipment investments less than $5,000 for any individual item, short term (less than 2 years) capital equipment investments or operating costs.

Contract Modification No. 10 Page 2 of 4 Contract No.: OP28367-000 Issued: 01/09119 CA: EH

C. DISADVANTAGED WORKER COMMITMENT
The Disadvantaged Worker Commitment included under the Contractor's Local Employment Plan shall:

1. Include a commitment to hire new Disadvantaged Workers that equals a minimum of 10°/o of the total of new wages and benefits for all Local W orkers. A Disadvantaged Worker is defined as (1) being homeless: (2) being a custodial single parent; (3) receiving public assistance: (4) lacking GED or high school diploma; (5) having a criminal record or other involvement in the criminal justice system: (6) suffering from chronic unemployment: (7) emancipated from the foster care system; or (8) being a veteran of the Iraq/Afghanistan war.

G:D. REPORTS
The Contractor shall submit quarterly progress reports to LACMTA detailing its adherence to the commitments made in the Local Employment Plan. The quarterly report shall summarize the major actions taken during the prior quarter in implementation of the Employment, and shall:

1. Specify the total number of Local Employee Full Time Equivalent (FTE) work performed in that quarter by type (trade or craft), duration, and location, and disadvantaged worker status, and the annual value of those jobs (expressed in direct OP28367-000 hours expended and people hired);

2. Describe the workforce development and training programs carried out during that quarter and the amount expended by the Contractor far such programs;

3. Describe the quarterly outreach and recruitments coordinated through workforce development and community groups that led to new local hires and;

4. Describe the extent to which the Local Employment Plans producing long-term employment in skilled or trade labor;

5. Describe the value of construction performed toward the Facility Investment Commitment; include copies of design and construction contracts.

If any such report indicates that the Contractor has failed to achieve the Total Local Employment Plan Commitment Value for local employee wages and benefits, Disadvantaged Worker wages and benefits or Facility Investments set forth in its Local Employment Plan for the time period involved, the report shall include a corrective action plan designed to achieve the Total Local Employment Plan Commitment Value, including a time frame within which such corrective actions will be achieved.
~.E RELATION TO MILESTONE PAYMENTS
LACMTA reserves the right to review and audit the Contractor's records, books and financial ledgers and cost accounting system at any time during the Contract term for purposes of determining the Contractor's compliance with Total Local Employment Commitment Value. In the event LACMTA determines that there has been a material Contract Modification No. 10 Page 3 of 4 Contract No.: OP28367-000 Issued: 01/09119 CA: EH

failure of the Contractor or its Subcontractors/suppliers to comply with any requirement of its Local Employment Plan, LACMTA shall notify the Contractor in writing and shall provide the Contractor with thirty (30) days to correct such non- compliance. If such non-compliance is not corrected to the satisfaction of LACMTA within such 30-day period (or such longer period as LACMTA may in its discretion allow), LACMTA may withhold a portion of the next Milestone Payment due to the Contractor under CP-02, in an amount that LACMTA determines in its discretion to be reasonable and appropriate based on the nature and extent of the Contractor's non- compliance. Any amounts withheld by LACMTA under this subsection shall be repaid to the Contractor, as part of the next Milestone Payment due, when the Contractor demonstrates to the satisfaction of LACMTA that it has corrected the non-compliance.

Any withholding under this subsection shall not affect the right of LACMTA to exercise other remedies available under this Contract for the Contractor's non-compliance with its Local Employment Plan, including the right to terminate for default in the event of repeated instances of such non-compliance.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 10 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC.

By:

Signat re
Type or Print Name
L~s ~ ~~
Date

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
Philip A. Washington
Chief Executive Officer
By:
lizab th Hernandez
Principal Contract Administrator
r~17~/g
Date
Contract Modification No. 10 Page 4 of 4 Contract No.: OP28367-000 Issued: 01!09!19 CA: EH

MAEL-045 Response Required: No
Date: January 28, 2019
File Nos.:

Action Item(s):

CDRL: n/a
Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509

SUBJECT: OP28367-000 40’ LOW FLOOR CNG TRANSIT BUSES
EXECUTED CONTRACT MODIFICATION NO.: 11

METRO REQUESTED CHANGES TO BUS DESIGN/CONFIGURATION

Reference: ELMA-054
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

Please call me at 213.922.7334 or e-mail at [email protected] if you have any questions.

Sincerely,

Elizabeth Hernandez
Principal Contract Administrator

Enclosure: Fully executed Contract Modification No. 11

cc: Kwesi Annan

Contract Modification No. 11 Page 1 of 2 Contract No.: OP28367-000 Issued: 01/15/19 CA: EH

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 11

FOR: FORTY FOOT (40’) LOW FLOOR CNG TRANSIT BUSES

This Contract Modification No. 11 to Contract No.: OP28367-000 is made effective on the 15th day of January 2019 by and between the LOS ANGELES COUNTY METROPOLITAN TRANS PORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC. , hereinafter referred to as "CONTRACTOR".

WHEREAS, CONTRACTOR and MTA e ntered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, date d December 6, 2017 , Contract Modificatio n No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018 , Contract Modification No. 5 dated February 12, 2018 , Contract Modification No. 6 dated April 23, 2018 , Contract Modification No. 7 dated October 3, 2018, Contract Modification No. 8 dated October 26, 2018 , Contract Modification No. 9 dated November 5, 2018, and Contract Modification No. 10 dated January 9, 2019, (the "Existing Contract") and;

WHEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein;

Now, therefore, it is mutually agreed, by and between the parties as follows:

MTA requested and approved changes to the bus design/configuration for an increase in the aggregate Contract amount of $279,870, inclusive of applicable taxes:

A. Heat shield between catalytic converter and HVAC unit B. Protective layer film for modesty panels
C. Ethernet cable for fare box
D. Ethernet cables for Automatic Passenger Control
E. Redesign of Rear Cross Seat Access to Engine Compartment (Jefferson doors)

Article IV COMPENSATION shall read as follows:

ARTICLE IV: COMPENSATION

A. Contract Price

1. In consideration of the Contractor’s full performance of the Work, and in accordance with the terms of the Contract, Metro will pay the Contractor the Contract Price of $199,044,300 $199,324,170, inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions.

Contract Options may be exercised unilaterally by LACMTA in accordance with Special Provisions Article SP-28, Options.

2. Training Aids -Additionally, in consideration of the Contractor's full performance of the W ork, and in accordance with the terms of the Contract, Metro will pay the Contractor for line items under Pricing Form PF-5 Training Aids in the amount of $349,646 inclusive of tax and delivery as provided in this Article and in the Contract Document entitled Compensation and Payment Provisions, CP- 2 (H).
a. Ea. One complete running engine and transmission assembly, including cooling and fueling systems, mounted on a suitable roll around stand (TS 5.6.3.a)
b. Ea. Anti-Lock Brake Board (TS 5.6.3.fl
c. Ea. Electric Air Conditioning Training Simulator Module (TS 5.6. 3.g) d. Ea. Video Security System (TS 5.6.3.i)
e. Ea. Multiplex Electrical Training Board (TS 5.6.3.k) f. Ea. Voith DIWA.6 transmission training cutaway (TS 5.6.3.b) Revised Pricing Forms: PF-1 and PF-1A as attached to this modification no. 11.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 11 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC. LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
By: Philip f#. W ing n
Signatur Chief ec tie icer
U ~l Gt~~tr~,~"^ By:Type or Print Name Wayne k b
Director, Corite~act Administration
/b/~ ~ zDate Date
Contract Modification No. 11 Page 2 of 2 Contract No.: OP26367-000 Issued: 01/15/19 CA: EH

GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') - CONTRACT PRICE SUMMARY
Contract Modification No.: 11
Proposer:

Contract No.:

Contract Title:

1.0 CONTRACT FOR 295 BUSES (BASE BUY) Taxable
No. Qty. Description of Item Unit Price Unit Price Total Price 1 229 40' Low Floor CNG Buses (Base Buy) from PF-1A Values derived from PF-1A*: $596,199.46 $615,939.30 $141,050,100 66 1 40' Low Floor CNG Buses (Base Buy) from PF-1A $595,805.53 $615,545.53 $40,626,005 1a Lot Manuals (Base Buy) (TS 5.6.4) $2,281.50 Lump Sum $23,400.00 1b 295 Vehicle Delivery Charge for Base Buy Value of all taxable delivery charges per bus**: $275.00 $81,125.00 1c 229 Tax (Base Buy Production Bus 67 - 295) 9.75% $58,129.45 $13,313,925 1d 66 Tax (Base Buy Production Bus 1-66) 9.75% $58,091.04 $3,834,009 2 2 Pilot Buses Retrofit with Rear Axle Upgrade $8,600 $17,201 2a Tax 9.75% $838.55 $1,677
3 Lot Reserved
4 Lot Reserved
5 Lot Reserved
6 Lot Reserved
7 Lot Performance Bond (Base Buy) Lump Sum $119,336.00
8 1,000 Total Training Hours for Base Buy*** $175,000.00 8a 900 Contractor (Proposer/Prime) Base Buy $175.00 $157,500.00 8b 100 Subcontractor/Supplier Base Buy $175.00 $17,500.00 9 1 System Management Tool for use at up to (13) MTA Operating Divisions per TS 86.1 $74,930.00 $74,930.00 10a 15 Special Towing Equipment (TS 25) $386.00 $5,790.00 10b Tax 9.75% $37.64 $564.53
11a 2 Rear Recovery Devices/Tie Downs (TS 25) $505.00 $1,010.00 11b Tax 9.75% $49.24 $98.48

1.0 Total Price for CONTRACT for 295 Base Buy Buses (Sum of Items "1" through "11b") to be the BASIS for Price Proposal evaluation In U.S. Dollars Using Figures: $199,324,170

ONE HUNDRED NINETY NINE MILLION THREE HUNDRED TWENTY FOUR THOUSAND ONE HUNDRED SEVENTY DOLLARSIn U.S. Dollars Using Words:

ELDORADO NATIONAL (CALIFORNIA), INC.

OP28367-000
FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT
LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 1 of 6

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') - CONTRACT PRICE SUMMARY
Contract Modification No.: 11
Proposer:

Contract No.:

Contract Title:

ELDORADO NATIONAL (CALIFORNIA), INC.

OP28367-000
FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT
NOTE
1 Unit Prices from Mod. No. 7 for Production Buses 1 - 65 *
**
***

2.0 CONTRACT FOR 150 UP TO 305 BUSES (OPTION BUY) Taxable No. Qty. Description of Item Unit Price Unit Price Total Price 10 305 40' Low Floor CNG Buses (Option Buy) from PF-1A for 150 to 305 vehicles* $596,199.46 $615,939.30 $187,861,486.50 10a Lot Manuals (Option Buy) (TS 5.6.4)*** $2,281.50 Lump Sum $23,400.00 10b 305 Vehicle Delivery Charge for Option Buy Value of all taxable delivery charges per bus**: $0.00 $275.00 $83,875.00 10c Tax (Option Buy) 9.75% $58,129.45 $17,731,762.94
11 Reserved $ $
12 Lot Performance Bond for Option Buy*** Lump Sum $123,421.00 13 500 Total Training Hours for Option Buy**** $87,500.00 13a 450 Contractor (Proposer/Prime) Option Buy $175.00 $78,750.00 13b 50 Subcontractor/Supplier Option Buy $175.00 $8,750.00 14 Reserved $ $

2.0 Total Price for CONTRACT for 150 Up to 305 Option Buy Buses (Sum of Items "10" through "14") to be the BASIS for Price Proposal evaluation In U.S. Dollars Using Words:

In U.S. Dollars Using Figures: $205,911,445
NOTE *
**
***
**** Training Hours for Option Buy are only estimates and not a guaranteed level of effort. The total for this Line is a Not-to-Exceed provisional amount.

Training Hours for Base Buy are only estimates and not a guaranteed level of effort. The total for this Line is a Not-to-Exceed provisional amount.

TWO-HUNDRED FIVE MILLION NINE HUNDRED ELEVEN THOUSAND FOUR HUNDRED FORTY

FIVE DOLLARS
Taxable Unit Price is the Unit Price less 1.14 Accessibility Provisions on PF-1A Input the taxable portion of the Delivery Charge under the Taxable Unit Price column and the total Delivery Charge under the Unit Price column Taxable Unit Price is the Unit Price less 1.14 Accessibility Provisions on PF-1A Input the taxable portion of the Delivery Charge under the Taxable Unit Price column and the total Delivery Charge under the Unit Price column For proposal purposes only, Manuals and Bond prices are for all 305 bus Options exercised. Actual cost will depend on Option quantity ordered.

LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 2 of 6

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') - CONTRACT PRICE SUMMARY
Contract Modification No.: 11
Proposer:

Contract No.:

Contract Title:

ELDORADO NATIONAL (CALIFORNIA), INC.

OP28367-000
FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT

3.0 OPTIONAL VEHICLE CONFIGURATION
No. Qty. Description of Item Unit Price Total Price
15 1 3 ADA Securement Configuration TS 81.5 (Total 15a - 15d) $6,370.00 15a Direct Materials/Equipment $5,750.00
15b Labor Installation Costs $620.00
15c Non Recurring Cost $0.00
15d Other Costs (Identify) $0.00
16 1 4 ADA Securement Configuration TS 81.5 (Total 16a - 16d) $10,170.00 16a Direct Materials/Equipment $9,150.00
16b Labor Installation Costs $1,020.00
16c Non Recurring Cost $0.00
16d Other Costs (Identify) $0.00
17 600 Reserved****
17a 295 Reserved
17b 305 Reserved
18 600 25-Year Certified CNG Tanks $522,000.00
18a 295 25 Yr Certified CNG Tanks for Base Buy $256,650.00 $870.00 18b 305 25 Yr Certified CNG Tanks for Option Buy for 150 up to 305 vehicles $265,350.00 $870.00 19 600 Complete Automatic Passenger Counter System TS 86.3 (Total 19a - 19h) $2,757,600.00 19a 295 Direct Materials/Equipment for Base Buy APC $4,136.00 19b 295 Labor Installation Costs for Base Buy APC $460.00 19c 295 Non Recurring Cost for Base Buy APC $
LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 3 of 6

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') - CONTRACT PRICE SUMMARY
Contract Modification No.: 11
Proposer:

Contract No.:

Contract Title:

ELDORADO NATIONAL (CALIFORNIA), INC.

OP28367-000
FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT
19d 295 Other Costs (Identify) for Base Buy APC $
Total for Base Buy APC $1,355,820.00 $4,596.00
19e 305 Direct Materials/Equipment for Option Buy APC for 150 up to 305 vehicles $4,136.00 19f 305 Labor Installation Costs for Option Buy APC for 150 up to 305 vehicles $460.00 19g 305 Non Recurring Cost for Option Buy APC for 150 up to 305 vehicles $ 19h 305 Other Costs (Identify) for Option Buy APC for 150 up to 305 vehicles $ Total for Option Buy APC for 150 up to 305 vehicles $1,401,780.00 $4,596.00 20 600 Enhanced 360 degree Camera System TS 86.1 (Total 20a - 20h) $579,000.00 20a 295 Direct Materials/Equipment for Base Buy Enhanced Camera System $869.00 20b 295 Labor Installation Costs for Base Buy Enhanced Camera System $96.00 20c 295 Non Recurring Cost for Base Buy Enhanced Camera System $ 20d 295 Other Costs (Identify) for Base Buy Enhanced Camera System $ Total for Base Buy Enhanced Camera System $284,675.00 $965.00 20e 305 Direct Materials/Equipment for Option Buy Enhanced Camera System for 150 up to 305 vehicles $869.00 20f 305 Labor Installation Costs for Option Buy Enhanced Camera System for 150 up to 305 vehicles $96.00 20g 305 Non Recurring Cost for Option Buy Enhanced Camera System for 150 up to 305 vehicles $ 20h 305 Other Costs (Identify) for Option Buy Enhanced Camera System for 150 up to 305 vehicles $ Total for Option Buy Enhanced Camera System for 150 up to 305 vehicles $294,325.00 $965.00 21 600 USB Ports for Passenger Charging Only $288,000.00 21a 295 USB Ports for Passenger Charging Only for Base Buy $141,600.00 $480.00 21b 305 USB Ports for Passenger Charging Only for Option Buy for 150 up to 305 vehicles $146,400.00 $480.00 22 600 Optional Wireless Stop Request Switches (Bus set) $291,000.00 22a 295 Optional Wireless Stop Request Switches (Bus set) for Base Buy $143,075.00 $485.00 LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 4 of 6

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') - CONTRACT PRICE SUMMARY
Contract Modification No.: 11
Proposer:

Contract No.:

Contract Title:

ELDORADO NATIONAL (CALIFORNIA), INC.

OP28367-000
FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT
22b 305 Optional Wireless Stop Request Switches (Bus set) for Option Buy for 150 up to 305 vehicles $147,925.00 $485.00 23 600 Optional Full Color Destination Sign Sets (TS 86.3) $2,070,000.00 23a 295 Optional Full Color Destination Sign Sets (TS 86.3) for Base Buy $1,017,750.00 $3,450.00 23b 305 Optional Full Color Destination Sign Sets (TS 86.3) for Option Buy for 150 up to 305 vehicles $1,052,250.00 $3,450.00 24 Lot Spare Parts (From Schedule A, Form PF-2) $2,261,788.13 25 Lot Special Tools ( Schedule B Form PF-3) $7,710.00
26 Lot Diagnostic Test Equipment (Schedule C, Form PF-4) $355,010.00 27 Lot Training Aids (Schedule D, Form PF-5) $989,385.00

3.0 Total Price for OPTIONAL VEHICLE CONFIGURATION (Sum of Items "15 through 27") for OPTIONAL EQUIPMENT to be BASIS for Price Proposal evaluation.

In U.S. Dollars Using Words:

In U.S. Dollars Using Figures: $10,138,033
**** Proposer shall provide base Low Nox Engine for each bus with the following Emission Levels:

ISLG engine is not the base engine requirement. Low Nox engine is the base requirement and therefore no longer an option.

Oxides of Nitrogen (NOx )
Grams per brake horsepower-hour

0.02 per brake horsepower hour

0.01 Particulate Matter (PM) grams

TEN-MILLION ONE HUNDRED THIRD EIGHT THOUSAND ONE HUNDRED THIRTY THREE

DOLLARS
LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 5 of 6

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1 (CNG - 40') - CONTRACT PRICE SUMMARY
Contract Modification No.: 11
Proposer:

Contract No.:

Contract Title:

ELDORADO NATIONAL (CALIFORNIA), INC.

OP28367-000
FORTY FOOT (40') LOW FLOOR CNG BUS PROCUREMENT

4.0 CONTRACT FOR BASE BUY, OPTION BUY, AND OPTIONALVEHICLE CONFIGURATION No. Qty. Description of Item Total Price

1.0 Total Price for CONTRACT for 295 Base Buy Buses to be the BASIS for Price Proposal evaluation $199,324,170

2.0 Total Price for CONTRACT for 150 Up to 305 Option Buy Buses to be the BASIS for Price Proposal evaluation $205,911,445

3.0 Total Price for OPTIONAL VEHICLE CONFIGURATION for OPTIONAL EQUIPMENT to be BASIS for Price Proposal evaluation $10,138,033

4.0 Total Price for CONTRACT for 295 Base Buy Buses, for 150 up to 305 Option Buy Buses, and Optional Vehicle Configuration for Optional Equipment combined to be the overall BASIS for Price Proposal evaluation In U.S. Dollars Using Words:

In U.S. Dollars Using Figures: $415,373,649
(Signature of Person Executing Proposal) Date
Type Name, Title

TONY WAYNE VICE PRESIDENT & GENERAL MANAGER

FOUR-HUNDRED FIFTEEN MILLION THREE HUNDRED SEVENTY THREE THOUSAND SIX

HUNDRED FORTY NINE DOLLARS
LACMTA
CONTRACT NO. OP28367-000
GA12-93 Page 6 of 6

PRICING FORM
PF1 - CNG 40'
Contract Mod. No. 11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1A (CNG - 40')

SUBSYSTEM EQUIPMENT
CONTRACT MODIFICATION NO. 11
Contractor:

Contract No.: OP28367-000

BASE BUY
NO. DESCRIPTION OF ITEM
1 Purchased Subsystem Equipment (Items 1.1 through 1.99) **

1.1 TS 9. Propulsion Power Assembly (PPA)*** $18,372

1.2 TS 9. Engine $60,324

1.3 TS 10. Cooling System $12,650

1.4 TS 18. Fuel System $68,300

1.5 TS 19.2 Heat shield between catalytic converter and HVAC unit $332.55

1.6 TS 23.1 Hinge Rear Cross Seat Access to the bulkhead $65.66

1.7 TS 31. Suspension $19,950

1.8 TS 33. Steering System $4,950

1.9 TS 37. Brakes $3,260

1.10 TS 39. Pneumatic System $6,850

1.11 TS 42. Charging System $36,800

1.12 TS 44. Multiplex Control System $24,200

1.13 TS 54. HVAC Climate Control System $29,450

1.14 TS 75.2 Protective film on modesty panels $116.94

1.15 TS 76 Ethernet Cable to Farebox $38.38

1.16 TS 78. Passenger Seats $28,955

1.17 TS 80. Doors $14,830

1.18 TS 81. Accessibility Provisions $19,740

1.19 TS 86. Communications $3,244

1.20 TS 86.3 Ethernet Cables in ITS enclosue $310.91

1.21 TS 11 Transmission $14,261

1.22 TS 78.1 USB Passenger Charging Port $480

1.23 TS85.1 Wirelesss Stop Request Button $485

1.24 TS 86.3 Matrix APC $4,596

1.99 TS 34 Meritor Rear Axle Upgrade $1,040
All other bus subsystem equipment not included above $241,944 TOTAL CNG BUS PRICE Production Bus 1 - 66 *$615,545.53 $393.80
Production Bus 67 - 295 $615,939.30
*Transfer Total CNG Bus Price to Contract Price Summary Form (PF-1 - Unit Price column, line Item 1 - Base Buy Notes: 1. ** Price shall include design, engineering, manufacturing/assembly, testing, shipping, profit and other associated costs. Price for each subsystem equipment shall include all applicable apparatus.

2. Price for line Item Nos. 1a-27 in the CONTRACT PRICE SUMMARY(Form PF-1) shall not be included in computing price of any of the line items above.

3. *** PPA unit price for line item 1.1 excludes prices for items 1.2 through 1.99

ELDORADO NATIONAL (CALIFORNIA), INC
Add Altro Flooring (Bus 67 - 295)

Page 1 of 2 ends

Pricing Form
PF1A - CNG 40'

SUBSYSTEM EQUIPMENT
Contract Mod. No.11
GROUP A - UP TO 600 40' CNG BUSES
FORM PF-1A (CNG - 40')

SUBSYSTEM EQUIPMENT
CONTRACT MODIFICATION NO. 11

OPTION BUY
NO. DESCRIPTION OF ITEM
2 Purchased Subsystem Equipment (Items 2.1 through 2.99) **

2.1 TS 9. Propulsion Power Assembly (PPA)*** $18,372

2.2 TS 9. Engine $60,324

2.3 TS 10. Cooling System $12,650

2.4 TS 18. Fuel System $68,300

2.5 TS 19.2 Heat shield between catalytic converter and HVAC unit $332.55

2.6 TS 23.1 Hinge Rear Cross Seat Access to the bulkhead $65.66

2.7 TS 31. Suspension $19,950

2.8 TS 33. Steering System $4,950

2.9 TS 37. Brakes $3,260

2.10 TS 39. Pneumatic System $6,850

2.11 TS 42. Charging System $36,800

2.12 TS 44. Multiplex Control System $24,200

2.13 TS 54. HVAC Climate Control System $29,450

2.14 TS 75.2 Protective film on modesty panels $116.94

2.15 TS 76 Ethernet Cable to Farebox $38.38

2.16 TS 78. Passenger Seats $28,955

2.17 TS 80. Doors $14,830

2.18 TS 81. Accessibility Provisions $19,740

2.19 TS 86. Communications $3,244

2.20 TS 86.3 Ethernet Cables in ITS enclosue $310.91

2.21 TS 11 Transmission $14,261

2.22 TS 78.1 USB Passenger Charging Port $480

2.23 TS85.1 Wirelesss Stop Request Button $485

2.24 TS 86.3 Matrix APC $4,596

2.99 TS 34 Meritor Rear Axle Upgrade $1,040
All other bus subsystem equipment not included above including flooring $242,338 TOTAL CNG BUS PRICE OPTION QUANTITY *$615,939.30
*Transfer Total CNG Bus Price to Contract Price Summary Form (PF-1 - Unit Price column, line item 10 - Option Buy) Notes: 1. ** Price shall include design, engineering, manufacturing/assembly, testing, shipping, profit and other associated costs. Price for each subsystem equipment shall include all applicable apparatus.

3. *** PPA unit price for line item 2.1 excludes prices for items 2.2 through 2.99 (Signature of Person Executing Proposal) Date
Type Name, Title

TONY WAYNE /VICE PRESIDENT & GENERAL MANAGER

2. Price for line Item Nos. 1-9 and 10a-27 in the CONTRACT PRICE SUMMARY(Form PF-1) shall not be included in computing price of any of the line items above.

Page 2 of 2 ends

Pricing Form
PF1A - CNG 40'

SUBSYSTEM EQUIPMENT
Contract Mod. No.11

MAEL-044 Response Required: No
Date: January 24, 2019
File Nos.:

Action Item(s):

CDRL: n/a
Richard Himes
Contract Administration Manager
Eldorado National (California), Inc. (ENC)
9670 Galena Street
Riverside, CA 92509

SUBJECT: OP28367-000 40’ LOW FLOOR CNG TRANSIT BUSES
EXECUTED CONTRACT MODIFICATION NO.: 12
MATRIX OF TECHNICAL SPECIFICATIONS CHANGES; CONFORMED

TECHNICAL SPECIFICATIONS (VOLUME II OF II)

Reference: ELMA-055
Dear Mr. Himes:

Enclosed is your executed original of the subject modification.

Please call me at 213.922.7334 or e-mail at [email protected] if you have any questions.

Sincerely,

Elizabeth Hernandez
Principal Contract Administrator

Enclosure: Fully executed Contract Modification No. 12

cc: Kwesi Annan

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY CONTRACT NO. OP28367-000, CONTRACT MODIFICATION NO.: 12 FOR: FORTY FOOT (40') LOW FLOOR CNG TRANSIT BUSES
This Contract Modification No. 12 to Contract No.: OP28367-000 is made effective on the 17~' day of January 2019 by and between the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter referred to as "MTA", and EL DORADO NATIONAL (CALIFORNIA), INC., hereinafter referred to as "CONTRACTOR".

W HEREAS, CONTRACTOR and MTA entered into Contract No.: OP28367-000 effective August 15, 2017, as amended by Contract Modification No. 1, dated November 6, 2017, Contract Modification No. 2, dated December 6, 2017, Contract Modification No. 3 dated December 27, 2017, Contract Modification No. 4 dated January 19, 2018, Contract Modification No. 5 dated February 12, 2018, Contract Modification No. 6 dated April 23, 2018, Contract Modification No. 7 dated October 3, 2018, Contract Modification No. 8 dated October 26, 2018, Contract Modification No. 9 dated November 5, 2018, Contract Modification No. 10 dated January 9, 2019, and Contract Modification No. 11 dated January 15, 2019 (the "Existing Contract") and;
W HEREAS, CONTRACTOR and MTA desire to modify the Existing Contract as provided herein; Now, therefore, it is mutually agreed, by and between the parties as follows:

Changes/revisions to Contract OP28367-000, Technical Specifications -Volume II of II as outlined in Attachment I. A conformed copy of the updated Technical Specifications, dated January 14, 2019, is enclosed with this modification.

Except as expressly amended hereby, the Existing Contract remains in full force and effect as originally executed.

IN WITNESS WHEREOF, the parties have caused this Contract Modification No. 12 to the Existing Contract to be executed by their respective officers duly authorized on the date first written above.

EL DORADO NATIONAL (CALIFORNIA), INC.

By: `- ~Signatur /
Type or Print Name
/ ,Date

LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION

AUTHORITY
Philip A. Washington
Chief E ecutiue Officer
gy. tu~ /~,(.c.tu
Eliza eth Hernandez
Principal Contract Administrator
~~ /ryDate

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 1 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue 1 RFP -
Amendment
No. 4
TS 1. Scope
These technical specifications contain the LACMTA's requirements for wheelchair accessible low flo or transit buses, which accommodate the widest spectrum of passengers including children, adults, the elderly, and the physically disabled, conforming to all applicable ADA regulations. These buses shall provide maximum passenger appeal in appearance, comf ort, and safety; combined with excellence in operating characteristics, standardization with existing LACMTA fleet, economy of operation, maximum efficiency, optimum seating, and conformity with federal, state and local regulations and emission standards. Buses shall include interior and exterior styling features in common with existing Metro BRT type buses such as streamlined appearance. These buses shall incorporate a high level of subsystem integration coordinated with central diagnostic functions and si ngle point Operator interface. Buses shall have a minimum expected life of 12 years or 500,000 miles, whichever comes first. Refer to Table 17 for design life goals.

Metro will consider and evaluate proposals of Zero Emission (ZE) buses that meet legal, di mensional, maintainability and performance requirements outlined in this document. Vendors proposing electric buses for consideration should also include a list of any specialty equipment used for fueling and/or recharging vehicle, any specialty support an d/or diagnostic equipment, and any other unique equipment that will be necessary to support daily operation of the vehicle. Any specialty equipment required to support the ZEB project should be itemized and listed along with estimated installation costs as part of each Contractor’s proposal. Any ZE buses proposed in response to this solicitation shall meet CARB’s definition for zero emission buses.

These technical specifications have been prepared with emphasis on in -service reliability. The basic structure of the bus including major suspension components shall be designed to last the life of the bus without major overhaul or replacement.

Wherever brand, manufacturer or product names are indicated in the Technical Specification, they are included for the pur pose of establishing identification and a general description of the Goods, Equipment, Components or parts. Wherever such names appear, the term “OR APPROVED EQUAL” is deemed to follow. The decision whether a proposed Item is an approved equal will be rend ered by LACMTA as defined by Contract GC-02-H SP-34 Non-Restrictive Clauses.

2 RFP -
Amendment
No. 4
TS 5.6.6 Diagnostic Laptop PC Specifications
Required Optional diagnostic laptop shall be Dell Latitude E6540 and at a minimum contain the following:

TABLE 2
Laptop Specifications

Category Description
Processor Intel Core i5-6300U (Dual Core, 2.4GHz, 3M cache) Operating System Windows 7 Professional English, French, Spanish 64 - bit (Includes Windows 10 Pro License)
CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 2 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue Memory 8GB (2x4GB) 2133MHz DDR4 Memory
Hard Drive 500GB 7200rmp 7.2krpm HD
Video Card AMD Radeon RT M360, for I5-6300U (Vpro Capable) Optical Drive Dell External USB Slim DVD+/-RW Optical Drive Battery Primary 4-cell 62W/HR Battery
Adapter 65 Watt AC Adaptor
Power Cord US Power Cord
LCD 15.6-inch HD (1366x768) Anti-Glare LCD
Wireless Intel Dual -Band Wireless -AC 8260 Wi -Fi +
BTW8260AC 4.1 Wireless Driver (2x2)
Keyboard Internal Dual Pointing Keyboard, English
Security Hardware Absolute Computrace Complete 5 Year - Education System Management No Out-of-Band System Management

System shall be compatible with all diagnostic software. Contractor shall provide a complete listing of all proposed software and hardware to the LACMTA Project Manager prior to purchasing.

Because of the time delay between the proc urement process and receipt of required computer equipment, the final laptop computer configuration shall be subject to approval by the LACMTA at delivery to ensure it has all of the appropriate and necessary software and is compatible with LACMTA’s other existing laptop computers. All laptop PCs shall include a suitable protective carrying “soft” case and a Microsoft mouse.
3 RFP -
Amendment
No. 4
TS 9.2.2 Propulsion System Service
The propulsion system shall be arranged so that accessibility for all routine maintenance is e nsured. No special tools, other than dollies and hoists, shall be required to remove the propulsion system or any subsystems. However, LACMTA shall recognize that properly rated equipment and safety electrical work practices are essential when servicing high-voltage electric components. The air compressor, radiator, all propulsion accessories, and any other component requiring service or replacement shall be easily re moveable. The Contractor shall provide all specialty tools and diagnostic equipment requir ed for maintaining the propulsion system in accordance with the Special Tools List.

All compartments and areas that include components using hazardous or higher voltages, shall incorporate safety warning labels to provide appropriate warning for service personnel. A secondary label shall be included to list the voltages in use within the compartment or area. Labels shall be visible when approaching the area. Labels shall include pictograph symbols for easy recognition.
4 RFP -
Amendment
No. 4
TS 10.1 Engine Cooling
A heavy-duty stainless steel radiator surge tank shall provide sufficient draw down capacity as required by the engine manufacturer. A heavy -duty single glass tube, (non-plastic), shall be provided to determine satisfactory engine coolant level CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 3 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue accessible by opening the surge tank access door. A spring -loaded, push-button type valve or lever shall be provided to safely release pressure or vacuum in the cooling system with both it and the water filler no more than 65 inches above the ground. Both shall be accessible t hrough the same access door. Surge tank filler cap shall have a safety lock. A ¼ -inch NPT port shall be provided in a convenient location in the surge tank for the LACMTA's pressure testing equipment, refer to CDRL Table 20 . The system shall be designed to allow coolant to be added while the cooling system is at full operating temperature incorporating an un -pressurized coolant overflow reservoir.

The radiator shall be of durable corrosion -resistant construction with bolt -on, removable, metal header tanks. No heat producing components, such as intake charge-air-coolers, or climate control system components shall be mounted between the engine cooling air intake aperture and the radiator. Sensor port fittings (1/8-inch NPTF) shall be provided in the upper and lower sections of the radiator to allow the use of thermocouple for diagnostics. Louvered fins are not acceptable.

Self-Cleaning
Radiator and charge air cooler fan(s) shall be electrically driven and capable of reverse operations for periodic self -cleaning of the radiator and charge air cooler.

For multiple fans, system shall be designed to prevent air recirculation in the event of individual fan failure.

A cooling system pressure gauge with an operating range of 0-30 psi, easily readable through the surge tank access door, shall be installed to monitor static and operating pressures.
5 RFP -
Amendment
No. 4
TS 42.1.4 Battery Compartment
The battery compartment shall prevent accumulation of water and debris on top of the batteries and shall be vented and self -draining. It shall be accessible only from the outside of the vehicle. All components within the battery compartment, and the compartment itself, shall be protected from damage or corrosion from the electrolyte. The inside surface of the battery compartment’s access door s hall be electrically insulated, as required, to prevent the battery terminals from shorting on the door if the door is damaged in an accident or if a battery comes loose. Battery enclosure, including access door or cover, shall be constructed of fiberglass , suitable plastic material, or stainless steel.

The battery quick disconnect access door shall be identified with a decal. The decal size shall not be less than 3.5 × 5 inches (8.89 × 12.7 cm).

The battery hold -down bracket shall be constructed of a non -metallic material (plastic or fiberglass).
6 RFP -
Amendment
No. 4
TS 43.1 Wiring and Terminals
Kinking, grounding at multiple points, stretching and reducing the bend radius below the manufacturer’s recommended minimum shall not be permitted. The wires used between data Bus and devices shall consist of UL or CSA approved multi -strand wires. The load side shall have wire UL or CSA approved.

Individual slip-on “spade” or “blade” type connectors are acceptable on a case -by- case basis during Pre-Production meeting review.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 4 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue This access door shall not require any special locking devices to gain access to the switch. The door shall be flush -fitting and incorporate a spring tensioner or equal to retain the door in a closed position when not in use.

The batteries shall be securely mount ed on a self -draining stainless steel or other non-corrosive material tray that can accommodate the size and weight of the batteries without deformation. The battery tray shall pull out easily and properly support the batteries while they are being service d. The tray shall allow each battery cell to be easily serviced and filled. A locking device shall retain the battery tray to the stowed position. A maximum of four batteries shall be securely mounted on each heavy -duty battery tray which shall accommodate the battery system.

Tray(s) shall pull out on heavy -duty rollers or swing out easily from outside the bus for service, inspection, and replacement.

If not located in the engine compartment, the same fire -resistant properties must apply to the battery comp artment. Sparking devices shall not be located within the battery box.
7 RFP -
Amendment
No. 4
TS 86.8 ITS Provisions, Wireless Local Area Network (WLAN) WLAN antenna, including five) leads; two) Cellular, two Wi -Fi and one GPS and an additional Wi -Fi antenna inside the bus for passenger Wi -Fi. Sierra Wireless , InMotion, oMG 2032 or an approved equal wireless router/switch and feedline shall be installed, subject to LACMTA approval in Pre -Production meetings. (Refer to Section TS 88.1 Approved Equals). Power for wireless rout er/switch shall be independently timed by the router to allow automatic turn-off one hour or more after bus is parked as a configurable feature of the router.
8 RFP -
Amendment
No. 4
TABLE 15
Approved Products

PRODUCT MANUFACTURER PRODUCT SPECIFICATION
Wireless Router (Wi-Fi System) InMotion Sierra Wireless InMotion, oMG 2032

9 RFP -
Amendment
No. 4
TS 88.5 References
SAE # Title Date
Published
J1908 Electrical Grounding Practice Jan 1, 1996

10 RFP –
Amendment
No. 5
TS 5.6.5 Special Equipment

Option, Special Service Equipment
The items in this section are discretionary and may be purchased through this contract, subject to LACMTA approval.

The Contractor shall supply pricing for 30 sets of Special Service Equipment listed below for use by LACMTA training staff. Pricing for this special service equipment is to be provided to the LACMTA on Form PF -4-Schedule C of Prices Special Service Equipment.

The LACMTA is aware that diagnostic equipment and/or software has been CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 5 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue developed or is being developed by many of the OEMs to assist in the maintenance of the Bus es. Proposer is required to submit a list of recommended special equipment, software and/or diagnostic tools deemed necessary to provide state -of- the-art service for the bus systems. Depending on the type of available equipment and/or software, the LACMTA may wish to obtain complete sets of such Special Service Equipment and/or software, plus any additional tools identified by the OEM manufacturer required to diagnose, calibrate, or remove -and-replace, all equipment provided with this bus order. The purchas e of any such Special Equipment and/or software is at the sole option of the LACMTA. Because of technological changes which may occur prior to and during the actual production of the buses, the LACMTA reserves the right to issue Change Orders for updated d iagnostic equipment, tools and software, and other Special Service Equipment at any time prior to Contract closeout.

For the Base order or any Option order that is exercised the Contractor shall provide pricing for Diagnostic Tools and Equipment listed bel ow. The quantities listed below are for 300 Base Vehicles. Quantities for Diagnostic Tools and Equipment of Option Vehicles will be determined at the time the Option is exercised. At a minimum, Proposers shall provide a complete listing of such currently available equipment and/or software and the proposed pricing in the Price Forms.

Engine/Propulsion and Electric Drive/Transmission:
• Engine/Propulsion Diagnostic software, including necessary cables and connectors with one year software registration.
• Transmission/Electric Drive diagnostic software, including necessary cables and connectors.
• PPU diagnostic software, including necessary cables and adapters. • Nexiq Technologies USB Link PC to Vehicle Interface.
• ABS/Regenerative Braking diagnostic software, including necessary cables and connectors.
• Engine/Propulsion cooling system diagnostic or programming software. • Power Management diagnostic tools and software.
• Battery Management diagnostic tools and software.

Electrical/Vehicle Control System:
• Multiplex/Vehicle Control software and connection kit to include applicable cables, connectors and translator boxes, no registration or upgrade fees attached.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 6 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue • Diagnostic laptop (to be defined) to include: applicable cables, connectors and translator boxes.
• Multiplex Module programmers, (if applicable).

Energy Storage and BMS
• Power management diagnostic software and connection kit to include applicable cables and adapters, including registration fees.

Doors
• Door System diagnostic or programming software.

Chassis – Undercarriage:
• Towing Equipment - To tow bus from front or rear hookup.

Interior:
• Video Security Diagnostic Kits including test fixture(s) and associated software application(s) that allows for installing components of each group, (Video Security, IBSS and Destina tion Sign) so that all the components of each group are easily accessible for programming, replacement, adjustment and troubleshooting including but not limited to all cables, DVR docking station, cameras, etc. Training aid should be integrated with the t raining program to allow off-the-bus training and familiarization of the systems. • Destination Sign Diagnostic Equipment (J1708 Protocol Boxes/software).

Heating Ventilation Air Conditioning (HVAC):
 A/C interface software and cable.

Diagnostic PC:
• Diagnostic laptops with necessary interface cables, power adapters. 11 RFP -
Amendment
No. 5
TS 25.Towing
Towing attachment points shall be provided on the front of the bus. Each towing device, when used with a load equalizing sling, shall withstand, without permanent deformation, tension loads up to 1.2 times the curb weight of the bus within 20 degrees of the longitudinal axis of the bus. If applicable, the rear towing device(s) shall not provide a toehold for unauthorized riders. The method of attaching the LACMTA’s towing bar sh all require the specific approval of the LACMTA in Pre - Production meetings and shall not require the removal, or disconnection, of front suspension or steering components. Removal of the bike rack is permitted for attachment of towing devices. Contractor shall provide 15 sets of any special towing equipment adapters, if required, so that the LACMTA is able to flat tow the bus.

Contractor shall demonstrate compliance with these provisions using the Pilot Bus.

Pricing for the towing equipment is to be provide d to the LACMTA on Form CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 7 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue PF-3-Schedule A for CNG and Schedule C for ZE of Prices Special Tools.

Provision of Connectors for Towing
Shop air connectors shall be provided at the front and rear of the bus and shall be capable of supplying all pneumatic system s of the bus with externally sourced compressed air. The location of these shop air connectors shall facilitate towing operations. A second air supply should be provided to allow the rear service brakes to be applied using the tow truck brake signal air pr essure to apply the rear primary service brakes.

All male fittings shall have an additional quarter turn manual shut off valve provided near the front bumper for use only during towing (AMFLO CP1 and C2), subject to LACMTA approval in Pre -Production meetings. Fittings shall be protected against dirt and moisture when not in use. Air connectors shall be LACMTA standard air chucks conveniently located in the engine compartment. Air lines leading to the external air shall include hand shut-off valves.

Lifted (Unsupported) Front Axle and Flat Towing Capability The front towing attachment points shall allow attachment of the LACMTA’s standard tow bar. The front towing attachment points shall permit towing of the bus at curb weight by the towing device(s) and t he LACMTA tow bar without damage to anybody panel or component. These devices shall permit common flat towing.

Two rear recovery devices/tie downs shall permit lifting and towing of the bus for a short distance, such as in cases of an emergency, to allow a ccess to provisions for front towing of bus. The method of attaching the tow bar or adapter shall require the specific approval of the LACMTA in pre -production meetings. Any tow bar or adapter exceeding 50 pounds should have means to maneuver or allow for ease of use and application. Each towing device shall accommodate a crane hook with a one-inch throat.
12 RFP -
Amendment
No. 5
TS 76 Fare Collection
Space and structural provisions shall be made for installation of 41 -inch GFI Genfare Odyssey Validation farebox and shall b e as far forward as practicable.

Location of the fare collection device shall not restrict traffic in the vestibule, including wheelchairs if a front door loading device is used, and shall allow the driver to easily reach the farebox controls and to view the fare register. The farebox shall not restrict access to the driver area, shall not restrict operation of driver controls and shall not — either by itself or in combination with stanchions, transfer mounting, cutting and punching equipment, or route destination signs — restrict the driver’s field -of- view per SAE Recommended Practice J1050. The location and mounting of the fare collection device shall allow use, without restriction, by passengers. The farebox location shall permit accessibility to the vau lt for easy manual removal or attachment of suction devices. Meters and counters on the farebox shall be readable on a daily basis. The floor under the farebox shall be reinforced as necessary to provide a sturdy mounting platform and to prevent shaking of the farebox.

Adjacent to the farebox area and within easy reach of the Operator, Contractor shall CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 8 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue provide a small clipboard approximately 4.5 inches by 5.5 inches to hold the operator schedule, (paddle).

The Contractor shall provide and install GFI Genfa re Odyssey Validation farebox base plate, power leads and ITS interface cable, subject to LACMTA approval in Pre-Production meetings.

Note: Proposers are to contact GFI Genfare directly to determine correct part numbers, harness length requirements, etc. The under floor reinforcement shall be of adequate strength to anchor the farebox using GFI installation kit B22249-0001 D22581-0005 or equivalent. Reinforcement plate shall include permanently attached nuts to secure the farebox base plate to the floor.

A circuit breaker protected, 20 -amp, 24-Volt DC battery circuit, shall be provided and powered through the battery connect switches. This power circuit shall include a grounded lead. A one-inch inside diameter waterproof conduit shall be provided from the ITS enclosure to the farebox base plate mounting location, through the bus floor, to protect the power leads and ITS interface cable, subject to LACMTA approval in Pre-Production meetings. Farebox end of conduit shall protrude above the floor at a minimum 1/2 inch to prevent moisture from entering the conduit. 13 RFP -
Amendment
No. 5
TS 80.7 Door Height Above Pavement
It shall be possible to open and close either passenger door when the bus loaded to gross vehicle weight rating is not knelt and parked with the tires touching an eight- inch high curb on a street sloping toward the curb so that the street side wheels are five inches higher than the right side wheels.

When the bus is at operating level, opened doors shall be a minimum 15.5 14 to 16 inches above the ground.
14 RFP -
Amendment
No. 5
Note: Table 19b applies to zero emission bus decals. Location and quantity of these decals will vary depending on the individual bus configuration. Final layout will be determined during Pre -Production meetings.

TABLE 19b
High Voltage – Metro ZE Bus
Area Description Size -
Inches
Location Qty Total

1. Lock Out
Compartment

4 x 6 Inside the
compartment
- Next to the
switch
1 AR

4 x 6 Inside the
compartment
- Next to the
switch
1 AR
CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 9 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue

2. Battery
Compartment(s)

6 x 4 Inside the
compartment
- On the
battery box
1 AR

4 x 6 Inside the
compartment
- On the
battery box
1 AR
XXX VOLTS 1 x 4 Inside the
compartment
- On the
battery box
1 AR

2 x 3 On the battery
enclosure
door, visible
from outside
1 AR

3. Automatic Start
Equipment

2 x 4 On the
equipment
1 AR

2 x 4 On the
compressor
1 AR

XXX VOLTS AC

3 PHASE
1 x 6 On the
equipment
and control
boxes
1 AR
XXX VOLTS 1 x 4 On the
equipment
and control
boxes
1 AR

4. Auxiliary Motor
Controller(s)

XXX VOLTS AC

3 PHASE
1 x 6 On the control
box(es) and
motor(s)
1 AR

5. PPU and
Hazardous
Voltage Area(s)

2 x 3 On the
enclosure
door, visible
from outside
1 AR

6 x 4 On the
enclosure
door, visible
from inside
1 AR
XXX VOLTS 1 x 4 Inside the
compartment
1 AR
CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 10 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue

4 x 6 On the
enclosure
door, visible
from inside
1 AR

6. Charging
Connector
(Bus Side)

2 x 3 On the
enclosure
door, visible
from inside
1 AR

7. Charging
Connector
(Station Side)

2 x 3 Next to each
charging
connector
1 AR

15 RFP -
Amendment
No. 5
Metro 40ft Decal Guide Revision 8-26-16
Decal document updated with revision date of 8-26-16 to include two additional decals for zero emission buses on last page, CS5775 and CS6289. Location and quantity for these two decals to vary depending on particular bus configuration.

Final layout will be determined during Pre-Production meetings. 16 RFP -
Amendment
No. 7
TS 2 Definitions
The following definitions are added to section TS 2.

Engine Package: Complete e ngine assembly inc orporating accessories necessary for operation as applicable. Package shall include at a minimum ; turbocharger(s), supercharger(s), electronic control modules, manifolds, throttle body, starter, air compressor, hydraulic pump and engine mounted filters.

Radiator Package: C omplete system with accessories necessary for operation. Package shall include at a minimum ; heat exchanger(s), cooling fan(s), electronic controller(s) with diagnostic communications and alternator if applicable.
17 RFP -
Amendment
No. 7
TS 5.6.4 Manuals
Manual Review and Approval
The Contractor shall be solely responsible for the accuracy and completeness of the manuals and the conversion of the Parts manual into Electronic Parts Catalog (EPC). The LACMTA will assemble a technical review committee to define acceptance criteria of the manuals deliverables, quality standards, file formats, expected results and the testing methods to be used. The Contractor shall put together a team with the technical capabilities to successfully complete these deliverables to LACMTA’s satisfaction.

The Contractor will be required to participate in Manual Review and Approval process and attend one service manual review meeting held at the LACMTA shortly following LACMTA Notice to Proceed. Except for the Parts Index, the draft manuals shall be shipped simultaneously with the first Pilot Bus. The final meeting will be scheduled after receipt of draft manuals but prior to the ship date of the first Production Bus.

Draft Manuals
Except for the Parts Index, the Contractor shall provide the LACMTA with draft CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 11 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue manuals simultaneously with the Pilot Bus: Draft manuals shall include:

 Ten draft hardcopies each of the Service, Parts and Operator’s manuals plus a list of all proposed OEM Component Repair manuals, simultaneously to the shipping of the first Pilot Bus.
 Draft Parts manuals are further defined to include a minimum of 95 percent of all part numbers with an error rate of less than 5 percent. It will be th e responsibility of the Contractor to ensure the accuracy of all part numbers.  Hard copy manuals shall be provided in suitable 3 -post binders clearly identified with the Bus manufacturer and model number, LACMTA Bus series number, revision date, and table of contents.
 A part number index shall be submitted for review at least 60 days prior to the scheduled ship date of the first production Bus.

Final Manuals
Final DVD editions of Service, Parts and Operator’s manuals must be delivered within 90 days after the start date for production Buses. Following the 90 day period after start of production the LACMTA may withhold $10,000 per Bus delivered until all maintenance and parts manuals are received.

• Ten final hardcopy sets of Service and Parts manuals shall be provided for each 100 Buses and 12 total sets for Subsystem OEM manuals. • For any Option Buses, four hardcopy sets of Service manuals shall be provided for each 10 Option Buses.
• Twenty final edition Service and Parts manuals excluding subsystem OEM component manuals shall be provided on DVD
• The Contractor shall supply two final hardcopy Operator’s manuals per every 10 buses and five total final electronic copies on DVD. • Contractor shall supply one diagnostic code card for each bus system a listing of d iagnostic codes with final service manuals delivered that covers trouble shooting fault trees/codes related to the PPU engine, transmission, ABS system, etc.

If separate subsystem OEM component supplier manuals are provided for preventative maintenance, d iagnostics, parts and repair, then the number of manuals provided shall correspond with the quantities described above.

Manuals on DVD
CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 12 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue Final edition Service and Parts manuals shall include an index and search function to locate items by subject, part name , or system. Updates shall be delivered to the Maintenance Instruction Department as they occur. Updates must be identified with effected system and with update revision dates.

The DVD versions shall be provided with licenses which permit the MTA to load t he manuals on an unlimited number of MTA computers and/or server units. Neither generic nor poor quality reproductions shall be acceptable. Manuals must be in English. The DVD version may consist of multiple DVDs.

The Contractor must be able to work with t he 3rd party EPC provider (Digabit, Inc., 850 Englewood Pkwy. #200, Englewood, CO 80110 (Phone # 303 957 -2822)) directly to convert their Parts manual into an EPC format suitable for use with LACMTA’s current ERP/EAM systems. EPC integration shall include the ability of the contractor to provide information in the current format for initial EPC publishing needs and continue working with the EPC publishing provider using current data formatting standards over the life cycle of the bus.

Manual - Updates
Updates to the manuals covering revisions, corrections or additions shall be grouped and released to the LACMTA as discovered or disclosed by LACMTA at a minimum of once per year but not to exceed three times per year for 12 years.

Updates shall be provided in electronic and hardcopy format and shall be delivered to the LACMTA Maintenance Instruction Department. Updates must be identified with defected system and with update revision dates.

Service Manuals
Service manuals shall be divided into separate sections as listed below:
a) Preventative Maintenance Procedures (PMP) by component or system - Specifically for use at LACMTA Operating Divisions. Procedures must identify what inspection criteria procedures are needed for each component or system at intervals by tim e or mileage. Daily inspection is not acceptable criteria for preventative maintenance.
b) Diagnostic Procedures - Include troubleshooting guides for all air, fluid, mechanical and electrical systems. Include schematics for fuel, air, hydraulic, coolant, HVAC , multiplex, braking and electrical with wiring harness drawings.
c) Component Repair/Service - The manuals must be organized to show every subsystem in the bus including all re -buildable components used. For example, the steering box, air compressor, power s teering pump, differential, transmission/electric drive/electric drive and PPU must be included. Component Reference Diagrams must be specific and referenced by exact exploded view diagrams.

PMP Section
PMP manuals shall be specific for the LACMTA’s bus or der and shall include the manufactures inspection and maintenance requirements for buses covered by this procurement and shall not contain any unrelated or unnecessary requirements. All CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 13 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue routine maintenance schedule requirements, including maintenance of ma jor subsystems, shall be provided in one master PMP matrix. The master PMP matrix shall include; specific service task, service mileage, and PMP service manual section reference. The PMP manual shall also include remove -and replace instructions for all sub -system components including: PPA, engine, transmission, starter, alternator, A/C compressor, air compressor, etc.

Diagnostic Section
Diagnostic manuals which may be integrated with the maintenance manual shall include isometric, phantom, and schematic ill ustrations as necessary to completely describe each system including but not limited to location and routing of air, hydraulic, water, lines and electrical harnesses including all anchor and attachment points. Diagnostic manuals shall also include trouble shooting guides necessary to complete running repairs for all supplied Bus equipment.

All wiring schematics and wiring harness drawings required in Service Manuals shall be provided in a separate publication in 11 X 17 inch uniform format. OEM schematics a nd those provided by all subsystem manufacturers shall be uniform diagrams with an emphasis on readability by mechanics performing diagnostic functions. Drawings shall provide functional grouping, continuity and interfacing at all connection points to elim inate unnecessary interfacing between multiple drawings and subsystem supplier drawings. Electrical schematic drawings shall include diagrams to clearly and accurately show locations of all electrical connectors splice and ground points for the Bus wiring harnesses.

Component Repair/Service Section
Fourteen sets of Repair Manuals necessary to rebuild all Contractor supplied Units including: PPU, transmission/electric drive, HVAC system, starter, alternator, air compressor, etc., shall be provided. Each cop y shall be the latest hardcopy edition issued by the OEM component manufacturer. Repair manuals shall be comprehensive and shall cover all aspects of repair from tear -down through final test as recommended by the Bus OEM. Repair manuals shall be grouped in sets and with a table of contents. Each set shall be organized and mounted onto a suitable table top holding rack subject to LACMTA approval. The LACMTA requires fourteen sets of wall posters with the repair manuals showing subsystem, component and part assembly, parts numbers, torque values, installation notes, etc.

A list of subsystem component repair manuals shall be submitted for LACMTA review at time of Pilot Bus delivery.

Parts Manuals
Must be specific and referenced by exact exploded-view diagrams and organized to coordinate with Service Manuals for ease of use. Parts manuals shall be specific to the LACMTA bus order including subsystem OEM PPU and transmission/electric drive parts listings. IPC and EPC manuals provided shall include illustrations wi th necessary exploded diagrams and data arranged so that part numbers can be readily found and identified in the illustration for each system and subsystem component, assembly, subassembly or piece part, from an orderly breakdown of the complete bus. An as sembly or subassembly is an identifiable portion of a component of a system or subsystem.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 14 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue Parts manuals shall contain a reference part number index, listed in numerical order with descriptions, and page numbers. The comprehensive number index shall include major subsystem parts numbers which includes the PPU, transmission/electric drive/, and air conditioning. A part number index shall be submitted for review at least 60 days prior to the scheduled ship date of the first production bus.

The parts list index shall also be provided to the LACMTA in a PC spreadsheet file on a DVD compatible with Microsoft Excel and include subsystem supplier part numbers, part description, and price. OEM component supplier part numbers are required.

Price List
Ten copies of the current price list shall be provided separately as a supplement to the final parts manuals. Price lists shall be updated at least annually and provided for the life of the bus as they are updated.

Operator’s Manuals
The Operator manuals shall be specific to the LACMTA bus configuration and designed for a LACMTA Bus Operator target audience, without extraneous material or information. Manuals shall clearly outline the features and controls, indicators necessary for safe and proper operation of the buses including ADA equipment. 18 RFP -
Amendment
No. 7
TS 83 Destination Signs
An automatic electronic bright white LED destination sign system shall be furnished on the front, on the curbside near the front door, on the right-front windshield area and on the rear of the bus. The destination signs on the front and front curbside shall be bright white high definition. Display areas of destination signs shall be clearly visible in direct sunlight and/or at night. Sign system shall provide optimum visibility of the message display units for passengers and shall meet applicable ADA requirements.

The destination sign compartments shall meet the following minimum requirements:
• Compartments shall be designed to prevent condensation and entry of moisture and dirt.
• Compartments shall be designed to prevent fogging of both compartment window and glazing on unit itself.
• Access shall be provided to allow cleaning of inside compartment window and unit glazing, subject to LACMTA approval in Pre-Production meetings. • Front window exterior display area shall be sized to allow full visibility of the front destination sign.

Destination signs shall be installed in such a manner as to facilitate easy access and replacement of the entire sign assembly, or components. Components such as electronic control modules shall be replaceable from inside the Bus. Where possible, parts shall be commercially available.

All signs shall be controlled via a single human-machine interface (HMI). In the CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 15 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue absence of a single mobile data terminal (MDT), the HMI shall be conveniently located for the bus driver within reach of the seated driver.

Optional Full Color Destination Signs
Pricing for optional full color signs in; Front, Side, Rear and Run Number locations, shall be submitted on Price Form PF -1, Schedule of Optional Vehicle Configuration. The signs shall be capable of utilizing the full color spectrum for displaying characters and background with adjustable resolution to provide optimum clarity for passengers reading the messages.

The color signs shall meet all sections of TS 83 requirements for white signs where applicable.

Front Destination Sign
The front destination sign shall have no less than 4,800 pixels, 24 rows by 200 columns, with a message display area of not less than 8.01 inches high by not less than 64.6 inches wide.

Side Destination Sign
Side display area shall have no less than 1,568 pixels, 14 rows by 112 columns with a message display area of not less than 4.3 inches high by not less than 41.6 inches wide. The sign located near the front door shall not block the driver’s critical horizontal line of sight.

Rear Route Number Sign
The route number display area shall have no less than 768 pixels, 16 rows by 48 columns with a message display area of not less than 6.1 inches high by not less than 17.0 inches wide. The rear route number sign shall be located a minimum of 90 inches above ground on the curb side rear corner of the Bus.

Destination Sign Control
Power to the sign system shall be controlled by the Bus "Master Run" switch. Sign system shall be operable in all switch positions except "Off".

Destination messages, rou te designations, and public relations messages shall be independently selectable via the Operator's Control Unit (OCU) which shall include a display monitor. The OCU shall communicate to the main processor board via a standard RS 485 serial bus and SAE J17 08. Software shall be capable of programming 10,000 message lines. The number of public relations messages shall be limited only by the remaining number of message lines not used for destination purposes. The three -digit destination code shall accept all h exadecimal numbers (i.e. 0-9, A, B, C, D, E, & F).

The rear route number sign shall be controlled by the same OCU that operates the destination signs. The OCU display monitor readout shall show the exact information displayed on the destination signs and route number sign.

Sign displays shall have alternating message capability with programmable blanking time between message lines as may be required. Variable blanking times shall be programmable between 0.5 to 25 seconds in duration. Each line message or b lanking time for each message shall be individually programmable. The message display units shall incorporate an automatic blanking feature that will cause the display area to blank within 30 seconds of the bus master power switch being turned “Off”.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 16 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue An em ergency message shall be initiated by the closure, or opening, of a dry contact switch or relay. The emergency message shall be displayed on the exterior of the bus only. The OCU shall not display the emergency message. The destination sign shall automatic ally resume normal operation only after battery power to the destination sign system is removed and restored through the battery disconnect switch.

Destination Sign Programming
The electronic sign system shall be programmable via an integral connector located in the front destination sign area. Software shall be furnished for programming the sign system via an IBM compatible lap -top computer. Software shall be capable of providing a high degree of flexibility to create, or select preprogrammed, fonts and graphic displays. The sign shall have the capability of being programmed in the field using a PC or field programmer. Message program information shall be transferable to and/or from the field programmer device, via a USB 2.0 or better.

The LACMTA shall provide the Contractor with a complete listing of destination sign readings for initial sign programming by the manufacturer.

Run Number Sign
A three-character electronic run number display shall be provided at a LACMTA approved location in the right front windshield. All three character spaces shall have the capability to display 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 and X readings.

19 RFP -
Amendment
No. 7
TS 86.1 Camera Surveillance System
An automatic digital video recording system shall be provided powered directly from batteries, bypassing the Master Battery Disconnect Switch(es), to operate (record images) at all times with the Master Control Switch in any position except "Off”. The system shall operate up to one hour (independently programmable) after the Master Switch is turned off. The system shall be self-initiating and operate at any time, with the Master switch in any position, including “Off”, if triggered by the activation of the Bus SAS. When triggered, the system shall tag images (write protect) to prevent overwrite.

All cameras must automatically adjust to light changes to capture images that have sufficient clarity at night, with bus lights on and off. A day -to-night demonstration shall be required to establish camera performance and final placement for optimum views and clarity. The LACMTA shall witness the demonstration and approve the final placement of the cameras. This demonstration must be successfully completed prior to approval of the Pilot Bus(es).

The types (part numbers), of cameras shall be minimized with a si ngle camera type for interior, and a single camera type for exterior of Bus. Exceptions to this requirement shall be considered on a case -by-case basis during Pre -Production meetings.

Interior Cameras
The camera housing shall be vandal resistant but allow access for routine servicing.

Field of view of the cameras shall be adjusted with a 60 degree vertical and 60 degree horizontal without relocating the camera. Each camera shall be IP type color images. Front interior camera(s) at front door passenger board ing area shall record CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 17 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue audio subject to LACMTA approval during Pre-Production meetings.

Cameras shall be placed for best recording of the following five areas:
a) Forward 1/3 of passenger area, view of front vestibule, farebox transactions and field-of-view to include Operator and image of bus number located on Operator’s barrier.
b) Front door, passenger boarding.
c) Rear door, passenger exiting.
d) Middle 1/3 passenger area.
e) Rear 1/3 passenger seating area starting from behind rear door with a primary emphasis on the rearmost seats.

Interior Camera Monitors
A video monitoring system including two, color, LCD video monitors with a minimum 15 inch diagonal dimension and all necessary brackets, cabling and other equipment needed for installation shall be provided to allow passengers easy viewing of video images captured by existing interior bus cameras. Monitors and equipment shall be installed in compliance with Driver Provisions, Controls and Instrumentation (Refer to Sections TS 46 -TS 48) and any applicable ADA or safety standards.

The first monitor shall be mounted above the driver’s area facing the entrance door and display a live video feed of the passengers boarding the bus.

The second monitor shall be mounted in passenger area of the bus facing the rear of the bus and display a live video feed of the passengers riding on the bus including those in wheelchair securement areas.

The monitors shall be of a ruggedized design intended for use in a transit bus environment including suitable protection from overvoltage and spikes generated from jump starts, shorts, etc. Monitors and equipment shall not be installed in a manner or located such that the performance or life of the components or system will be shortened when operating within the design operating profile.

Monitors shall include a replaceable shield or durable film over the monitor screens to protect them from vandalism. This sacrificial layer shall be replaceable in 5e minutes or less using simple hand tools.

Monitor enclosures and screens shall not be affected by periodic cleaning using commercially available cleaning agents, solvents and other chemicals used for removal of graffiti.

Exterior Cameras
Cameras shall be IP type, rated for water spray and submersion, (IP65 and IP67), housed in impact resistant, mois ture resistant, low profile housings which do not protrude more than 2.5 inches from the bus body. If used, a cover placed over the camera lens shall be glass. Curbside camera housings shall be ruggedized to protect from impacts with trees and other objects encountered during routine service. This shall include a supplemental metal shield if necessary to meet CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 18 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue this requirement. The camera circuitry and lens shall be easily replaceable from inside the bus or by removing the housing from outside the bus using common hand tools. Camera positions and adjustment are subject to LACMTA approval at Pilot Bus. Reusable waterproof seals to prevent water damage to the camera and circuitry shall be provided which will not require the use of additional sealant such as silicon after servicing the camera. The system shall be designed or configured such that the failure of any individual camera will not affect operation of the remaining cameras.

Cameras shall be placed for best recording of the following four areas:
a) Forward looking through windshield (Accident Surveillance) b) The curb side area of the bus, (including exit door), and street from 10 feet beyond front bumper to 10 feet beyond rear bumper
c) Street side area of the bus and street from ten feet beyond the front bumper to 10 feet beyond the rear bumper
d) Rear camera shall view the ground behind the bus from the bumper to approximately 25 feet back when gear select is placed in “Reverse” position.

Forward Accident Surveillance Camera
The forward looking surveillance camera shall be positioned to obtain images of the exterior front of the bus and forward approximately 100 feet of roadway to record images in the event of an accident.

Camera Monitor
Dash mounted monitor for viewing of selected camera images when; gear selector is placed in “Reverse” or passenger doors are open. Monitor shall be user configurable and capable of simultaneous display of images from multiple cameras.

Final monitor configuration is subject to LACMTA approval during Pre -Production meetings
Central Processor
The video security system central processor shall be packaged in a suitable ventilated, shock mounted and splash resistant enclosure keyed to LACMTA standards, located within the ITS enclosure, subject to LACMTA approval in Pre - Production meetings. Images shall be stored by the system on a removable mobile rated hard drive provided with a security lock typical to the existing LACMTA base station.

Images stored on the hard drive shall be organized for automatic transmittal via a digital modem. The ha rd drive shall have capacity to store a minimum of 240 images per second for 30 continuous days (18 hours per day) before automatic overwrite occurs.

The DVR shall be capable of recording in multiple formats including JPEG and in H.264 compression with up to D1 resolution to avoid loss of detail on zoomed images. The DVR must be able to switch record rate, compression and resolution seamlessly without loss of video during transition. System shall be capable of CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 19 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue accepting both analog NTSC and high definition wide dynamic range IP cameras.

All image requests and subsequent downloaded files shall have the capability to be stored on a hard drive. The hard drive shall be easily removed and video files viewed at a separate location equipped with the same drive mechanism.

System Management
Processor shall utilize GPS data to synchronize system time and tag video files with location coordinates allowing files to be searched on a geographic location basis.

System shall utilize a WLAN compatible with wireless networks in use at LACMTA divisions and shall incorporate a system management tool for; wireless download of video files in a timely manner, software upgrades, camera checks, configuration changes and health reports as required. Final configuration is subject to L ACMTA approval in Pre-Production meetings.

System management tool shall be a virtual implementation and provide expansion capability including compatibility with existing video management applications at LACMTA.

In addition, System Management Tool shall: (include on pricing sheet)  Be configured to run in Master-Slave mode under Virtual Box.  Provide the ability to replicate user accounts and passwords from Master to Slave.
 Include provisions for future application authentication to Metro Microsoft Active Directory.
 Allow user management at Master server and all Slave servers with inherent accounts from Master.
 Backup the restore virtual image via the host operating system to last backup state.
 Support Metro Enterprise backup and archive management tools such as IBM Tivoli.
 Support use of Metro’s MS Windows 2008 R2 approval image on host servers with Metro domain and security policies.
 Allow NAS storage at remote sites.
 Include OS and application security and patch management process.  Be optimized for hardware utilization in shared computing resources with Orbital DIS.

WLAN shall also be capable of transmitting encrypted video images or files on a real-time basis to a laptop PC held by law enforcement personal adjacent to or CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 20 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue behind the bus. DVR status and event data shall also be made available through J1708/1587 interface to ATMS VAN. DVR shall be individually programmable to record each camera sequentially.

Pricing of the system management tool for use at up to 13 LACMTA operating divisions shall be provided to the LACMTA on Price Form PF -4, Schedule C of Prices of Diagnostic Test Equipment.

Enhanced Video Recording System Option
Pricing for optional features to enhance the video recording system shall be provided on Price Form PF -1, Schedule of Optional Vehic le Configuration. The features shall include items listed below along with any other enhancements that Contractor believes would improve functionality and ease of use for the video recording system.
 System Management tool to include video search capability using GPS coordinates as reference.
 Ability of video system to analyze and discern events such as wheelchair passengers and generate report information with summary data such as wheelchair passenger count and boarding/alighting locations.  The ability to u tilize the dash mounted display for diagnostic work or configuration changes on the DVR.
 Incorporation of a 360 degree camera for better surveillance of bus interior. 19 Contract
Mod. No.: 12
TS 19.2 Exhaust System
Exhaust gases and waste heat shall be discharged from the roadside rear corner of the roof. The exhaust pipe shall be of sufficient height to prevent exhaust gases and waste heat from re-entering the bus, discoloring or causing heat deformation to the roof of the bus. The entire exhaust system shall be adequately shielded to prevent heat damage to any bus component, including the exhaust after -treatment compartment area. Heat shield shall be installed between Catalytic Converter and HVAC unit to protect HVAC unit and wire harnesses in the area from radiant heat em anating from the Catalytic Converter after engine shut down, subject to LACMTA approval. The exhaust outlet shall be designed to minimize rain, snow or water generated from high -pressure washing systems from entering into the exhaust pipe and causing damage to the after-treatment.

Exhaust system shall incorporate joints as necessary to facilitate removal and replacement of individual components including exhaust muffler or, if required to meet emissions requirements, catalyst units. Mounting cushions, if pr ovided, must last the life of the engine and shall not deteriorate when exposed to high exhaust system temperatures. Exhaust piping joints shall be machined V -band clamp design. Flexible exhaust lines necessary to accommodate engine movement shall be constructed from stainless steel bellows. Exhaust piping in the engine enclosure shall include reusable metal jacket that is easy to replace.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 21 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue

20 Contract
Mod. No.: 12
TS 23.1 Engine Compartment Bulkheads
The passenger and engine compartment shall be separated by fire -resistant bulkheads. The engine compartment shall include areas where the engine and exhaust system are housed. This bulkhead shall preclude or retard propagation of an engine compartment fire into the passenger compartment and shall be in accordance with the Recomm ended Fire Safety Practices defined in FTA Docket 90A, latest revision. Only necessary openings shall be allowed in the bulkhead, and these shall be fire -proof. Any passageways for the climate control system air shall be separated from the engine compartme nt by fireproof material.

Piping through the bulkhead shall have copper, brass, or fireproof fittings sealed at the bulkhead with copper or steel piping on the forward side. Wiring may pass through the bulkhead only if connectors or other means are provide d to prevent or retard fire propagation through the bulkhead. The conduit and bulkhead connector shall be sealed with fireproof material at the fire wall. Engine access panel s in the bulkhead shall be fabricated of fireproof material and hinged to the bulk head secured with fireproof fasteners. These panels, their fasteners and the bulkhead shall be constructed and reinforced to minimize warping of the panels during a fire that will compromise the integrity of the bulkhead. Access panels shall be constructed to prevent vapors and fumes from entering the passenger compartment.
21 Contract
Mod. No.: 12
TS 73.5.1 Transit Bus
Brake lights shall be provided in accordance with FMVSS 108 and Part 393, Subpart B of the FMCSA as applicable.

High and Center Mount Red Brake Lamp
Bus shall i nclude red, high and center mount brake lamp(s) along the backside of the bus in addition to the lower brake lamps required under FMVSS 108. The high and center mount brake lamp(s) shall illuminate steady with brake application. Two LED seven-inch diameter sealed tail lights or 2-inch by eighteen -inch LED strip lights shall be mounted on each side of the engine closure door or rear end panels, so that the lights are not affected by engine heat (Refer to Section TS 88.1 for Approved Products). The (red) stop /tail lights shall be mounted directly above the (amber) directional signal lights. Two additional LED (red) stop lights shall be located above the engine compartment door on the centerline of the bus. If stop and tail lights are not visible from the rear when engine door is in the open position, two LED four -inch diameter amber hazard warning lights, one on each side of engine compartment, shall be furnished and activated by the turn signals. Each light shall be replaceable as an individual unit. Plastic lenses shall be protected with a high performance scratch and chemical resistant coating to prevent deterioration.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 22 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue 22 Contract
Mod. No.: 12
TS 75.2 Modesty Panels
Sturdy divider panels constructed of durable, unpainted, stainless steel complementing the interior shall be pr ovided to act as both a physical and visual barrier for seated passengers in front of each leading row of forward facing seats.

Design and installation of modesty panels located in front of forward -facing seats shall include a handhold or grab handle along its top edge. These dividers shall be mounted on the sidewall and shall project toward the aisle no farther than passenger knee projection in longitudinal seats or the aisle side of the transverse seats. Modesty panels shall extend from at least the windo w opening of the side windows, and those forward of transverse seats shall extend downward to one and

1.5 inches above the floor. Panels forward of longitudinal seats shall extend to below the level of the seat cushion. Dividers positioned at the doorways shall provide no less than a 2.5 inches clearance between the modesty panel and a fully open, inward opening door, or the path of a deploying flip -out ramp to protect passengers from being pinched. Modesty panels installed at doorways shall be equipped with grab rails if passengers assist are not provided by other means.

The modesty panel and its mounting shall withstand a static force of 250 pounds applied to a four × four inch area in the center of the panel without permanent visible deformation.

At the rear door area a clear non -glass panel, with multiple layer protective film installed on both sides, from above the modesty panel to the top of the daylight opening and attached to the stanchion.

Modesty panels shall be bolted or riveted to handrails or ins talled in U -channels with self-locking nuts and securely attached to stanchion and body side. Modesty panels located at the forward edge of the upper floor area shall be attached along the top to handrails for added stiffness. Panels shall be attached to bottom extruded anodized aluminum rails for stiffness.
23 Contract
Mod. No.: 12
TS 87 Event Data Recorder (EDR)
EDR shall be installed on the bus. The unit shall be installed as low as possible.

The EDR shall be able to communicate over the Jl939 CAN line and shall be equipped with three -axis accelerometer. The system shall be capable of recording available fault codes including DM1 messages. Settings are to be finalized with the LACMTA during Pre -Production. The EDR shall broadcast via the Jl939 data communication link severe impact events to the vehicle monitoring system and also trigger an event in the camera system. The EDR shall also tag an event from a signal received over the Jl939 CAN line from the silent alarm switch signal and the camera event button and in turn broa dcast these events to the vehicle monitoring system. The EDR shall also record the following operational data:
• Head lights on or off.

CONTRACT NO.: OP28367-000
Modification No. 12, Attachment I
Volume II Technical Specification Changes

Contract No.: OP28367-000 Page 23 of 23 Modification No. 12 Attachment I
Ref
#
Reference # Paragraph number, Paragraph title, and Paragraph changes.

Additions are in bolded Red and deletions are in crossed out bolded Blue • Turn signals and hazard lights on or off.
• Ignition on or off.
• Low air pressure warning.
• Whether moving in forward or reverse or idling.
• Parking brake is on or off.
• Retarder switch on or off
• Brakes – Stopping distance
• Vehicle Acceleration/Deceleration
• HVAC operating information
• Entrance and Exit Doors operating information

End of Attachment I
1 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Los Angeles County Metropolitan Transportation Authority

Technical

Specification s
(GROUP A - 40-FOOT CNG BUSES)
Contract Modification No. 12

Contract No.: OP28367-000

FORTY-FOOT (40’) LOW FLOOR

CNG BUS PROCUREMENT

January 14, 2019
November 10, 2017

VOLUME II OF II

2 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19

Contents
SECTION 6: TECHNICAL SPECIFICATIONS ......................................................................................... 9 TS 1. Scope ................................................................................................................................................... 9 TS 2. Definitions ........................................................................................................................................... 9 TS 2.1 Abbreviations ............................................................................................................................ 16 TS 3. Referenced Publications .................................................................................................................... 19 TS 4. Legal Requirements ........................................................................................................................... 19 TS 5. Overall Requirements ........................................................................................................................ 19 TS 5.1 Weight ....................................................................................................................................... 19 TS 5.2 Capacity .................................................................................................................................... 20 TS 5.3 Service Life ............................................................................................................................... 20 TS 5.4 Maintenance and Inspection ..................................................................................................... 20 TS 5.5 Interchangeability ..................................................................................................................... 20 TS 5.6 Training ..................................................................................................................................... 21 TS 5.7 Operating Environment ............................................................................................................. 29 TS 5.8 Noise ......................................................................................................................................... 29 TS 5.9 Fire Safety ................................................................................................................................. 30 TS 5.10 Fire Suppression ..................................................................................................................... 30 TS 5.11 Gas Detection System (GDS) ................................................................................................. 31 TS 5.12 Respect for the Environment .................................................................................................. 32 TS 5.13 Water Leak Testing ................................................................................................................. 32 TS 5.14 Fasteners and Securements ..................................................................................................... 32 TS 6. Physical Size ..................................................................................................................................... 33 TS 6.1 Bus Length ................................................................................................................................ 33 TS 6.2 Bus Width ................................................................................................................................. 33 TS 6.3 Bus Height ................................................................................................................................ 34 TS 6.4 Step Height ............................................................................................................................... 34 TS 6.5 Underbody Clearance ............................................................................................................... 34 TS 6.6 Ramp Clearances ...................................................................................................................... 34 TS 6.7 Ground Clearance ..................................................................................................................... 34 TS 6.8 Floor Height .............................................................................................................................. 35 TS 6.9 Interior Headroom ..................................................................................................................... 35 TS 6.10 Aisle Width ............................................................................................................................. 35 TS 7. Power Requirements.......................................................................................................................... 36 TS 7.1 Top Speed ................................................................................................................................. 36 TS 7.2 Grade-ability ............................................................................................................................. 36 TS 7.3 Acceleration .............................................................................................................................. 36 TS 7.4 Operating Range ....................................................................................................................... 37 TS 8. Fuel Economy (Design Operating Profile) ........................................................................................ 38 TS 9. Engine (Near-zero 0.02 g/bhp NOx Engine Option?) ....................................................................... 39 TS 9.1 Engine (CNG) ........................................................................................................................... 40 TS 9.2 Propulsion System (Electric) .................................................................................................... 41 TS 10. Cooling Systems .............................................................................................................................. 42 TS 10.1 Engine Cooling ....................................................................................................................... 43 TS 10.2 Charge Air Cooling ................................................................................................................. 44 TS 10.3 Transmission Cooling ............................................................................................................. 44 TS 10.4 Electric Drive System Cooling ............................................................................................... 45 TS 11. Transmission (Conventional Powertrain) ........................................................................................ 45 TS 12. Retarder (Transit Bus) ..................................................................................................................... 45 TS 13. Engine Brake (Commuter Bus) ....................................................................................................... 46 3 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 14. Mounting ......................................................................................................................................... 46 TS 14.1 Service .................................................................................................................................... 46 TS 15. Hydraulic Systems ........................................................................................................................... 47 TS 15.1 Fluid Lines .............................................................................................................................. 48 TS 15.2 Fittings and Clamps ................................................................................................................ 48 TS 15.3 Charge Air Piping ................................................................................................................... 49 TS 16. Radiator ........................................................................................................................................... 49 TS 17. Oil and Hydraulic Lines .................................................................................................................. 49 TS 18. Fuel .................................................................................................................................................. 49 TS 18.1 Fuel Lines ............................................................................................................................... 49 TS 18.2 Design and Construction ......................................................................................................... 50 TS 19. Emissions and Exhaust .................................................................................................................... 53 TS 19.1 Exhaust Emissions .................................................................................................................. 53 TS 19.2 Exhaust System ....................................................................................................................... 53 TS 19.3 Exhaust After-treatment .......................................................................................................... 53 TS 19.4 Particulate After-treatment...................................................................................................... 53 TS 20. General ............................................................................................................................................ 53 TS 20.1 Design ..................................................................................................................................... 53 TS 21. Altoona Testing ............................................................................................................................... 54 TS 21.1 Structural Validation ............................................................................................................... 54 TS 22. Distortion ......................................................................................................................................... 54 TS 23. Resonance and Vibration ................................................................................................................. 54 TS 23.1 Engine Compartment Bulkheads ............................................................................................ 54 TS 23.2 Crashworthiness (Transit Bus) ................................................................................................ 54 TS 24. Corrosion ......................................................................................................................................... 55 TS 25. Towing ............................................................................................................................................ 55 TS 26. Jacking ............................................................................................................................................. 56 TS 27. Hoisting ........................................................................................................................................... 56 TS 28. Floor ................................................................................................................................................ 57 TS 28.1 Design (Transit Bus) ............................................................................................................... 57 TS 28.2 Design (Commuter Bus) ......................................................................................................... 57 TS 28.3 Design (Articulated Transit Bus) ............................................................................................ 57 TS 28.4 Strength ................................................................................................................................... 57 TS 28.5 Construction ............................................................................................................................ 57 TS 28.6 Construction (Commuter Bus) ................................................................................................ 57 TS 29. Platforms ......................................................................................................................................... 58 TS 29.1 Driver’s Area .......................................................................................................................... 58 TS 29.2 Driver’s Platform .................................................................................................................... 58 TS 29.3 Farebox ................................................................................................................................... 58 TS 29.4 Rear Step Area to Rear Area (Transit Bus)............................................................................. 59 TS 30. Wheel Housing ................................................................................................................................ 59 TS 30.1 Design and Construction ......................................................................................................... 59 TS 30.2 Design and Construction (Transit Bus) ................................................................................... 59 TS 30.3 Articulated Joint (Articulated Transit Bus) ............................................................................. 60 TS 30.4 Raceway (Articulated Transit Bus) ......................................................................................... 60 TS 30.5 Bellows ................................................................................................................................... 60 TS 31. Suspension ....................................................................................................................................... 60 TS 31.1 General Requirements ............................................................................................................. 60 TS 31.2 Alignment ............................................................................................................................... 60 TS 31.3 Springs and Shock Absorbers ................................................................................................. 60 TS 32. Wheels and Tires ............................................................................................................................. 61 TS 32.1 Wheels .................................................................................................................................... 61 TS 32.2 Tires ........................................................................................................................................ 62 TS 33. Steering ............................................................................................................................................ 62 4 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 33.1 Steering Axle (Transit Bus) .................................................................................................... 62 TS 33.2 Steering and Tag Axles (Commuter Bus) ............................................................................... 62 TS 33.3 Steering Wheel ........................................................................................................................ 62 TS 34. Drive Axle ....................................................................................................................................... 63 TS 34.1 Non-Drive Axle ...................................................................................................................... 64 TS 35. Tag Axles (Commuter Coach) ........................................................................................................ 64 TS 36. Turning Radius ................................................................................................................................ 64 TS 37. Brakes .............................................................................................................................................. 65 TS 37.1 Service Brake .......................................................................................................................... 65 TS 37.2 Actuation ................................................................................................................................. 65 TS 37.3 Friction Material ..................................................................................................................... 65 TS 37.4 Hubs and Drums/Discs ........................................................................................................... 65 TS 37.5 Hubs and Drums (Commuter Bus) ......................................................................................... 66 TS 37.6 Parking/Emergency Brake ...................................................................................................... 66 TS 38. Interlocks (Transit Bus) ................................................................................................................... 66 TS 38.1 Passenger Door Interlocks ...................................................................................................... 66 TS 38.2 Lift Interlocks ......................................................................................................................... 67 TS 38.3 Kneel Interlocks ...................................................................................................................... 67 TS 38.4 Fuel System Interlocks ............................................................................................................ 67 TS 39. Pneumatic System ........................................................................................................................... 67 TS 39.1 General .................................................................................................................................... 67 TS 39.2 Air Compressor ....................................................................................................................... 68 TS 39.3 Air Lines and Fittings ............................................................................................................. 69 TS 39.4 Air Reservoirs ......................................................................................................................... 69 TS 39.5 Air System Dryer .................................................................................................................... 70 TS 40. Overview ......................................................................................................................................... 70 TS 40.1 Modular Design ...................................................................................................................... 71 TS 41. Environmental and Mounting Requirements ................................................................................... 71 TS 41.1 Hardware Mounting ................................................................................................................ 71 TS 42. General Electrical Requirements ..................................................................................................... 72 TS 42.1 Batteries .................................................................................................................................. 72 TS 42.2 Grounds ................................................................................................................................... 74 TS 42.3 Low Voltage/Low Current Wiring and Terminals .................................................................. 75 TS 42.4 Electrical Components ............................................................................................................ 76 TS 42.5 Electrical Compartments ......................................................................................................... 76 TS 43. General Electronic Requirements .................................................................................................... 77 TS 43.1 Wiring and Terminals ............................................................................................................. 77 TS 44. Multiplexing .................................................................................................................................... 78 TS 44.1 General .................................................................................................................................... 78 TS 44.2 System Configuration ............................................................................................................. 78 TS 45. Data Communications ..................................................................................................................... 78 TS 45.1 General .................................................................................................................................... 78 TS 45.2 Drivetrain Level ...................................................................................................................... 79 TS 45.3 Multiplex Level ....................................................................................................................... 79 TS 45.4 Electronic Noise Control ........................................................................................................ 80 TS 46. Driver’s Area Controls .................................................................................................................... 80 TS 46.1 General .................................................................................................................................... 80 TS 46.2 Glare ....................................................................................................................................... 81 TS 46.3 Visors/Sun Shades .................................................................................................................. 81 TS 46.4 Driver’s Controls .................................................................................................................... 81 TS 46.5 Normal Bus Operation Instrumentation and Controls ............................................................ 82 TS 46.6 Driver Foot Controls ............................................................................................................... 87 TS 46.7 Brake and Accelerator Pedals ................................................................................................. 88 TS 46.8 Driver Foot Switches .............................................................................................................. 88 5 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 47. Driver’s Amenities .......................................................................................................................... 88 TS 47.1 Coat Hanger ............................................................................................................................ 88 TS 47.2 Drink Holder ........................................................................................................................... 88 TS 47.3 Storage Box............................................................................................................................. 88 TS 47.4 Repair Card Holder ................................................................................................................. 88 TS 47.5 Safety Equipment .................................................................................................................... 89 TS 47.6 Bus Registration Holders ........................................................................................................ 89 TS 47.7 Trash Hooks ............................................................................................................................ 89 TS 48. Windshield Wipers and Washers .................................................................................................... 89 TS 48.1 Windshield Wipers ................................................................................................................. 89 TS 48.2 Windshield Washers ............................................................................................................... 89 TS 49. Driver’s Seat .................................................................................................................................... 89 TS 49.1 Dimensions ............................................................................................................................. 90 TS 49.2 Seat Belt ................................................................................................................................. 91 TS 49.3 Adjustable Armrest ................................................................................................................. 92 TS 49.4 Seat Control Locations ............................................................................................................ 92 TS 49.5 Seat Structure and Materials ................................................................................................... 92 TS 49.6 Pedestal ................................................................................................................................... 92 TS 49.7 Seat Options ............................................................................................................................ 92 TS 49.8 Mirrors .................................................................................................................................... 92 TS 50. General ............................................................................................................................................ 94 TS 51. Windshield ...................................................................................................................................... 94 TS 51.1 Glazing .................................................................................................................................... 94 TS 52. Driver’s Side Window ..................................................................................................................... 94 TS 53. Side Windows ................................................................................................................................. 95 TS 53.1 Configuration .......................................................................................................................... 95 TS 53.2 Emergency Exit (Egress) Configuration ................................................................................. 95 TS 53.3 Configuration .......................................................................................................................... 95 TS 53.4 Materials ................................................................................................................................. 96 TS 53.5 Rear Window .......................................................................................................................... 96 TS 54. Capacity and Performance ............................................................................................................... 96 TS 55. Controls and Temperature Uniformity ............................................................................................ 97 TS 55.1 Auxiliary Heater ..................................................................................................................... 98 TS 56. Air Flow .......................................................................................................................................... 98 TS 56.1 Passenger Area ........................................................................................................................ 98 TS 56.2 Driver’s Area .......................................................................................................................... 98 TS 56.3 Controls for the Climate Control System (CCS) .................................................................... 98 TS 56.4 Driver’s Compartment Requirements ..................................................................................... 99 TS 56.5 Driver’s Cooling ..................................................................................................................... 99 TS 57. Air Filtration .................................................................................................................................... 99 TS 58. Roof Ventilators .............................................................................................................................. 99 TS 59. Maintainability .............................................................................................................................. 100 TS 60. Entrance/Exit Area Heating ........................................................................................................... 100 TS 61. Floor-Level Heating ...................................................................................................................... 100 TS 61.1 Transit Bus ............................................................................................................................ 100 TS 61.2 Commuter Bus ...................................................................................................................... 100 TS 62. Design ............................................................................................................................................ 100 TS 62.1 Materials ............................................................................................................................... 100 TS 62.2 Roof-Mounted Equipment (Transit Bus) .............................................................................. 101 TS 62.3 Curb Feelers .......................................................................................................................... 101 TS 63. Pedestrian Safety ........................................................................................................................... 101 TS 64. Repair and Replacement ................................................................................................................ 101 TS 64.1 Side Body Panels (Transit Bus) ............................................................................................ 101 TS 64.2 Side Body Panels (Commuter Bus) ...................................................................................... 101 6 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 65. Rain Gutters ................................................................................................................................... 101 TS 66. License Plate Provisions ................................................................................................................ 101 TS 66.1 Rub rails ................................................................................................................................ 101 TS 67. Fender Skirts ................................................................................................................................. 102 TS 68. Wheel Covers (Transit Bus) .......................................................................................................... 102 TS 68.1 Splash Aprons ....................................................................................................................... 102 TS 69. Service Compartments and Access Doors ..................................................................................... 102 TS 69.1 Access Doors (Transit Bus) .................................................................................................. 102 TS 69.2 Access Doors (Commuter Bus) ............................................................................................ 103 TS 69.3 Access Door Latch/Locks ..................................................................................................... 103 TS 70. Bumpers ........................................................................................................................................ 103 TS 70.1 Location ................................................................................................................................ 103 TS 70.2 Front Bumper ........................................................................................................................ 103 TS 70.3 Rear Bumper ......................................................................................................................... 103 TS 70.4 Bumper Material ................................................................................................................... 104 TS 70.5 Bicycle Rack ............................................................................................................................... 104 TS 71. Finish and Color ............................................................................................................................ 104 TS 71.1 Appearance ........................................................................................................................... 104 TS 72. Decals, Numbering and Signing .................................................................................................... 105 TS 72.1 Passenger Information .......................................................................................................... 105 TS 73. Exterior Lighting ........................................................................................................................... 105 TS 73.1 Backup Light/Alarm ............................................................................................................. 106 TS 73.2 Doorway Lighting ................................................................................................................. 106 TS 73.3 Turn Signals .......................................................................................................................... 106 TS 73.4 Headlights ............................................................................................................................. 106 TS 73.5 Brake Lights .......................................................................................................................... 107 TS 73.6 Service Area Lighting (Interior and Exterior) ...................................................................... 107 TS 74. General Requirements ................................................................................................................... 108 TS 75. Interior Panels ............................................................................................................................... 108 TS 75.1 Driver Area Barrier ............................................................................................................... 108 TS 75.2 Modesty Panels ..................................................................................................................... 109 TS 75.3 Front End .............................................................................................................................. 110 TS 75.4 Rear Bulkhead....................................................................................................................... 110 TS 75.5 Headlining ............................................................................................................................. 110 TS 75.6 Fastening ............................................................................................................................... 111 TS 75.7 Insulation .............................................................................................................................. 111 TS 75.8 Floor Covering ...................................................................................................................... 111 TS 75.9 Interior Lighting .................................................................................................................... 112 TS 75.10 Passenger ............................................................................................................................ 112 TS 75.11 Driver’s Area ...................................................................................................................... 112 TS 75.12 Seating Areas (Transit Bus) ................................................................................................ 112 TS 75.13 Seating Areas (Commuter Bus) .......................................................................................... 112 TS 75.14 Vestibules/Doors (Transit Bus)........................................................................................... 112 TS 75.15 Vestibules/Doors (Commuter Bus) ..................................................................................... 112 TS 75.16 Step Lighting....................................................................................................................... 113 TS 75.17 Ramp Lighting (Transit Bus) .............................................................................................. 113 TS 75.18 Turntable Lighting (Articulated Bus) ................................................................................. 113 TS 75.19 Farebox Lighting ................................................................................................................. 113 TS 76. Fare Collection .............................................................................................................................. 113 TS 77. Interior Access Panels and Doors (Transit Bus) ............................................................................ 114 TS 77.1 Floor Panels .......................................................................................................................... 114 TS 78. Passenger Seating .......................................................................................................................... 114 TS 78.1 Arrangements and Seat Style (Transit Bus) .......................................................................... 114 TS 78.2 Rearward Facing Seats (Transit Bus) ................................................................................... 115 7 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 78.3 Turntable Seating (Articulated Bus) ..................................................................................... 115 TS 78.4 Padded Inserts/Cushioned Seats (Transit Bus) ..................................................................... 115 TS 78.5 Seat back fitness .................................................................................................................... 115 TS 78.6 Drain Hole in Seats ............................................................................................................... 115 TS 78.7 Arrangements and Seat Style (Commuter Bus) .................................................................... 116 TS 78.8 Hip-to-Knee Room ............................................................................................................... 116 TS 78.9 Foot Room ............................................................................................................................ 116 TS 78.10 Aisles (Transit Bus) ............................................................................................................ 116 TS 78.11 Aisles (Commuter Bus) ...................................................................................................... 116 TS 78.12 Dimensions (Transit Bus) ................................................................................................... 116 TS 78.13 Structure and Design (Transit Bus) ..................................................................................... 117 TS 78.14 Structure and Design (Commuter Bus) ............................................................................... 118 TS 78.15 Construction and Materials (Transit Bus) ........................................................................... 118 TS 78.16 Construction and Materials (Commuter Bus) ..................................................................... 118 TS 79. Passenger Assists (Transit Bus) .................................................................................................... 119 TS 79.1 Assists (Transit Bus) ............................................................................................................. 119 TS 79.2 Front Doorway ...................................................................................................................... 119 TS 79.3 Vestibule (Transit Bus) ......................................................................................................... 119 TS 79.4 Rear Doorway(s) (Transit Bus) ............................................................................................. 120 TS 79.5 Overhead (Transit Bus) ......................................................................................................... 120 TS 79.6 Longitudinal Seat Assists (Transit Bus) ............................................................................... 120 TS 79.7 Wheel Housing Barriers/Assists (Transit Bus) ..................................................................... 120 TS 80. Passenger Doors ............................................................................................................................ 121 TS 80.1 Transit Bus ............................................................................................................................ 121 TS 80.2 Commuter Bus ...................................................................................................................... 121 TS 80.3 Materials and Construction ................................................................................................... 121 TS 80.4 Dimensions ........................................................................................................................... 122 TS 80.5 Door Glazing......................................................................................................................... 122 TS 80.6 Door Projection (Transit Bus) ............................................................................................... 123 TS 80.7 Door Height Above Pavement .............................................................................................. 123 TS 80.8 Closing Force ........................................................................................................................ 123 TS 80.9 Actuators ............................................................................................................................... 124 TS 80.10 Emergency Operation ......................................................................................................... 124 TS 80.11 Door Control ....................................................................................................................... 124 TS 80.12 Door Controller ................................................................................................................... 125 TS 80.13 Door Open/Close ................................................................................................................ 125 TS 81. Accessibility Provisions ................................................................................................................ 125 TS 81.1 Loading Systems ................................................................................................................... 125 TS 81.2 Lift ........................................................................................................................................ 125 TS 81.3 Loading System for 30 to 60-ft Low-Floor Bus ................................................................... 126 TS 81.4 Loading System for Level Boarding on a 45 to 60ft Low-Floor BRT.................................. 126 TS 81.5 Wheelchair Accommodations ............................................................................................... 126 TS 81.6 Interior Circulation ............................................................................................................... 129 TS 82. Wheelchair Lifts (Commuter Bus) ................................................................................................ 129 TS 82.1 Lift ........................................................................................................................................ 129 TS 82.2 Lift Door ............................................................................................................................... 129 TS 82.3 Lift Width ............................................................................................................................. 129 TS 82.4 Lighting Requirements ......................................................................................................... 129 TS 82.5 Securement System ............................................................................................................... 129 TS 82.6 Roof Ventilation/Escape Hatches ......................................................................................... 129 TS 83. Destination Signs ........................................................................................................................... 129 TS 84. Passenger Information and Advertising (Transit Bus) .................................................................. 131 TS 84.1 Interior Displays ................................................................................................................... 131 TS 84.2 Exterior Displays .................................................................................................................. 131 8 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 85. Passenger Stop Request/Exit Signal .............................................................................................. 131 TS 85.1 Transit Bus ............................................................................................................................ 131 TS 85.2 Commuter Bus ...................................................................................................................... 132 TS 85.3 Signal Chime......................................................................................................................... 132 TS 86. Communications ............................................................................................................................ 132 TS 86.1 Camera Surveillance System ................................................................................................ 133 TS 86.2 Public Address System ......................................................................................................... 136 TS 86.3 Automatic Passenger Counter (APC) ................................................................................... 136 TS 86.4 Radio Handset and Control System ...................................................................................... 136 TS 86.5 ITS Provisions Power Supply ............................................................................................... 137 TS 86.6 ITS Provisions Conduits ....................................................................................................... 138 TS 86.7 Provisions, Automated Vehicle Announcement (AVA) System .......................................... 139 TS 86.8 ITS Provisions, Wireless Local Area Network (WLAN) ..................................................... 139 TS 86.9 ITS Provisions, Radio Antennas ........................................................................................... 139 TS 86.10 ITS Provisions, Global Positioning System (GPS) ............................................................. 139 TS 86.11 ITS Provisions, IBSS .......................................................................................................... 139 TS 87. Event Data Recorders .................................................................................................................... 140 TS 88. Appendix ....................................................................................................................................... 140 TS 88.1 Approved Equals ................................................................................................................... 140 TS 88.2 Maintainability Requirements ............................................................................................... 141 TS 88.3 Technical Contract Deliverables ........................................................................................... 142 TS 88.4 Decals/Signs.......................................................................................................................... 143 TS 88.5 References ............................................................................................................................. 147 TS 88.6 Holders .................................................................................................................................. 148

9 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 SECTION 6: TECHNICAL SPECIFICATIONS
GENERAL (TS 1-TS 5)
TS 1. Scope
These technical specifications contain the LACMTA's requirements for wheelchair accessible low floor transit buses, which accommodate the widest spectrum of passengers including children, adults, the elderly, and the physically disabled , conforming to all applicable ADA regulations. These buses shall provide maximum passenger appeal in appearance, comfort, and safety; combined with excellence in operating characteristics , standardization with existing LACMTA fleet, economy of operation, maximum efficiency, optimum seating, and conformity with federal, state and local regulations and emission standards. Buses shall include interior and exterior styling features in common w ith existing Metro BRT type buses such as streamlined appearance.

These buses shall incorporate a high level of subsystem integration coordinated with central diagnostic functions and single point Operator interface. Buses shall have a minimum expected life of 12 years or 500,000 miles, whichever comes first. Refer to Table 17 for design life goals.

Metro will consider and evaluate proposals of Zero Emission (ZE) buses that meet legal, dimensional, maintainability and performance requirements outlined in this document. Vendors proposing electric buses for consideration should also include a list of any specialty equipment used for fueling and/or recharging vehicle, any specialty support and/or diagnostic equipment, and any other unique equipment that will be necessary to support daily operation of the vehicle. Any specialty equipment required to support the ZEB project should be itemized and listed along with estimated installation costs as part of each Contractor’s proposal. Any ZE buses proposed in response to this solicitation shall meet CARB’s definition for zero emission buses.

These technical specifications have been prepared with emphasis on in -service reliability. The basic structure of the bus including major suspension components shall be designed to last the life of the bus without major overhaul or replacement.

Wherever brand, manufacturer or product names are indicated in the Technical Specification, they are included for the purpose of establishing identification and a general description of the Goods, Equipment, Components or parts. Wherever such names appear, the term “OR APPROVED EQUAL” is deemed to follow. The decision whether a proposed Item is an approved equal will be rendered by LACMTA as defined by Contract SP-34 Non-Restrictive Clauses.

TS 2. Definitions
Ackerman Geometry: A geometric arrangement of linkages in the steering of a vehicle designed to solve the problem of wheels on the inside and outside of a turn needing to trace out circles of different radii. The intention of Ackermann geometry is to avoid the need for tires to slip sideways when following the path around a curve.

Alternative: An alternative specification condition to the default bus configuration. LACMTA may define alternatives to the default configuration to satisfy local operating requirements. Alternatives for the default configuration will be clearly identified.

Ambient Temperature: The temperature of the surrounding air. For testing purposes, ambient temperature must be between 16°C (50°F) and 38°C (100°F).

Analog Signals: A continuously variable signal that is solely dependent upon magnitude to express information content.

Aspect Ratio: The ratio of height to width of a character. 10 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Audible Discrete Frequency: An audible discrete frequency is determined to exist if the sound power level in any 1/3-octave band exceeds the average of the sound power levels of the two adjacent 1/3-octave bands by four decibels (dB) or more.

Auxiliary Power System: Provides single or three phase power for functions other than propulsion.

Battery: One or more electrochemical cells that convert stored chemical energy into electricity.

Battery Compartment: Low-voltage energy storage, i.e. 12/24 VDC batteries.

Battery Management System (BMS): Monitors energy, as well as temperature, cell or module voltages, and total pack voltage. The BMS adjusts the control strategy algorithms to maintain the batteries at uniform state of charge and optimal temperatures.

Braking Resistor: Device that converts electrical energy into heat, typically used as a retarder to supplement or replace the regenerative braking.

Burst Pressure: The highest pressure reached in a container during a burst test.

Capacity (fuel container): The water volume of a container in gallons (liters).

Cells: Individual components (i.e., battery or capacitor cells).

Code: A legal requirement.

Combination Gas Relief Device: A relief device that is activated by a combination of high pressures or high temperatures, acting either independently or together.

Composite Container for Compressed Gas: A container fabricated of two or more materials that interact to facilitate the container design criteria.

Compressed Natural Gas (CNG): Mixtures of hydrocarbon gases a nd vapors consisting principally of methane in gaseous form that has been compressed for use as a vehicular fuel.

Container: A pressure vessel, cylinder or cylinders permanently manifold together, used to store compressed gas.

Container Appurtenances: Devices connected to container openings for safety, control or operating purposes.

Container Valve: A valve connected directly to a container outlet.

Curb Weight: Weight of vehicle, including maximum fuel, oil and coolant; and all equipment required for operation and required by this Specification, but without passengers or driver. dBA: Decibels with reference to 0.0002 microbar as measured on the “A” scale.

DC to DC Converter: A module that converts a source of direct current from one voltage level to another.

Default Configuration Bus: The bus described if no alternatives are selected. Signing, colors, the destination sign reading list and other information must be provided by the LACMTA.

Defueling: The process of removing fuel from a tank or container.

Defueling Port: Device that allows for vehicle defueling, or the point at which this occurs 11 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Design Operating Profile : The anticipated design requirements are based on LACMTA’s operating environment for LACMTA’s service area and as designed in TS 5.7 . Specific characteristics include; “CBD type” urban heavy -duty duty -cycle, high passenger loading, five to 100 percent relative humidity, temperature range of -10°F to 120°F, and elevation range of 200 feet below sea level to 3,000 feet above sea level.

Destroyed: Physically made permanently unusable.

Discrete Signal: A signal that can take only pre -defined values, usually of a binary 0 or 1 nature, where 0 is battery ground potential and 1 is a defined battery positive potential.

Driver’s Eye Range: The 95th-percentile ellipse defined in SAE Recommended Practice J941, except that the height of the ellipse shall be determined from the seat at its reference height.

Duty Cycle: A service cycle that utilizes only the CBD portion of the FTA ADB heavy -duty transit Vehicle cycle. The CBD portion shall be further modified to add 20 minutes of idle time.

Electric: A vehicle that uses one distinct power sources to propel the vehicle.

Electric System Controller (ESC): Regulates energy flow throughout electric system components in order to provide motive performance and accessory loads, as applicable, while maintaining critical syste m parameters (voltages, currents, temperatures, etc.) within specified operating ranges.

Electric Drive System (EDS): The mechanical and/or electromechanical components, including traction motors and energy storage system, which comprise the traction drive portion of the electric propulsion system.

Electronic Parts Catalog (EPC): Digital versions of the illustrated parts catalog that can upload into Metro’s Enterprise Asset Management (EAM) or Enterprise Resource Planning (ERP) systems.

Energy Density: The relationship between the weight of an energy storage device and its power output in units of watt-hours per kilogram (Wh/kg).

Energy Storage System (ESS): A component or system of components that stores energy and for which its supply of energy is rechar geable by the on -vehicle system (engine/regenerative braking/ generator) or an off-vehicle energy source.

Engine Package: Complete e ngine assembly inc orporating accessories necessary for operat ion as applicable. Package shall include at a minimum ; turbocharger(s), supercharger(s), electronic control modules, manifolds, throttle body, starter, air compressor, hydraulic pump and engine mounted filters.

Extended Warranty: Warranties that extend past the minimum warranty periods defined in the warrant y requirements.

Failures Classifications are listed below.
 Class 1 Failure (Physical Safety): A failure that could lead directly to passenger, bus operator or other injury and/or results in a crash.
 Class 2 Failure (Road Call): A failure resulting in an interruption of service. Passengers are removed from the bus at the point of failure; the bus is unable to continue in revenue service. Service is discontinued until the bus is replaced or repaired at the point of failure.
 Class 3 Failure (Bus Change): A failure that requires removal of the bus from service during its assignments.

The bus is operable to a rendezvous point but cannot be used in passenger service until repairs are made.  Class 4 Failure (Bad Order): A failure not related to safety that degra des the operation of the bus but does not require the bus’s removal from service.
12 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19

Fill Pressure for Compressed Gas: The pressure attained at the actual time of filling. Fill pressure varies according to the gas temperatures in the container, which are dependent on the charging parameters and the ambient conditions. The maximum dispensed pressure shall not exceed 125 percent of service pressure.

Fireproof: Materials that will not burn or melt at temperatures less than 2000 °F.

Fire Resistant: Materials that have a flame spread index less than 150 as measured in a radiant panel flame test per ASTM-E 162.

Firewall: A fire resistant barrier designed to slow the spread of fire for a prescribed period of time.

Flow Capacity: For natural gas flow, this is the capacity in volume per unit time (normal cubic meters/minute or standard cubic feet per minute) discharged at the required flow rating pressure.

Free Floor Space: Floor area available to standees, excluding the area under seats, area occupied by feet of seated passengers, the vestibule area forward of the standee line, and any floor space indicated by manufacturer as non-standee areas such as, the floor space “swept” by passenger doors during operation.

Floor area of 1.5 sq . ft. shall be allocated for the feet of each seated passenger that protrudes into the standee area.

Fuel Cell: A device that converts the chemical energy from a fuel into electricity through a chemical reaction with oxygen and another oxidizing agent.

Fuel Line: The pipe, tubing or hose on a vehicle, including all related fittings, through which natural gas passes.

Fuel Management System: Fuel system components that control or contribute to engine air fuel mixing and metering, and the ignition and combustion of a given air -fuel mixture. The fuel management system would include, but is not limited to, reducer/regulator valves, fuel metering equipment (e.g. carburetor, injectors), sensors (e.g., main throttle, waste gate).

Fusible Material: A metal, alloy or other material capable of being melted by heat.

Gross Axle Weight Rating (GAWR): The maximum total weight as determined by the axle manufacturer, at which the axle can be safely and reliably operated for its intended purpose.

Gross Load: 150 pounds for every designed passenger seating position, for the driver, and for each 1.5 sq.-ft. of free floor space.

Gross Vehicle Weight (GVW): Curb weight plus gross load.

Gross Vehicle Weight Rating (GVWR): The maximum total weight as determined by the vehicle manufacturer, at which the vehicle can be safely and reliably operated for its intended purpose.

Hazardous Voltage: Greater than 50 volts (AC and DC).

Head Injury Criteria (HIC): The following equation presents the definition of head injury criteria:
13 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19

2.5 1 2
t
2 1
1 t - t a dt ( t - t )( )
-t1
2 





Where a = the resultant acceleration at the center of gravity of the head form expressed as a multiple of g, the acceleration of gravity. t1 and t2 = any two points in time during the impact.

High Pressure: Those portions of the CNG fuel system exposed to full container or cylinder pressure.

High Voltage (HV): Greater than 600 volts (AC and DC).

High Voltage Charger: Regulated DC supply used to charge the propulsion battery pack.

Hose: Flexible line.

Illustrated Parts Catalog (IPC): A series of assemblies and sub -assemblies that combine into a parts manual with sections. Metro recogni zes that a complete illustrated part catalog includes component breakdown in a disassembly sequence and their illustrations.

Intermediate Pressure: The po rtion of a CNG system after the first pressure regulator, but before the engine pressure regulator. Intermediate pressure on a CNG vehicle is generally from 3.5 to 0.5 MPa (510 to 70 psi).

Inverter: A module that converts DC to and from AC.

Jerk: The rate of change of acceleration shall be minimized throughout the acceleration/deceleration range and shall not be greater than 15.5 mph/sec/sec (0.3g/sec).

Labeled: Equipment or materials to which has been attached a label, symbol or other identifying mark of an organization, which is acceptable to the authority having jurisdiction and concerned with product evaluation, which maintains periodic inspection of production labeled equipment or materials, and by labeling, the manufacturer indicates compliance with ap propriate standards or performance in a specified manner.

Leakage: Release of contents through a Defect or a crack. See Rupture.

Line: All tubes, flexible and hard, that carry fluids.

Liner: Inner gas-tight container or gas container to which the overwrap is applied.

Local Regulations: Regulations below the state level.

Low-Floor Bus: A bus that, between at least the front (entrance) and rear (exit) doors, has a floor sufficiently low and level so as to remove the need for steps in the aisle between the doo rs and in the vicinity of these doors.

Low Voltage (LV): 50 volts or less (AC and DC).

Low Voltage Generation: Provides 12 or 24 volt DC to properly charge and maintain the charge on low voltage batteries as well as provide power for a variety of bus systems including; lighting, multiplex and other control modules.

Lower Explosive Limit: The lowest concentration of gas where, given an ignition source, combustion is possible.
14 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Maintenance Personnel Skill Levels: Defined below are the LACMTA's maintenance personnel skill levels:
 3M: LACMTA Mechanic
 2M: Bus Service Attendant
Master Run Switch: Rotary four-position switch controlling the following functions:
• Off: All systems off
• Day Run: All electrical systems and engine on except; headlights, parking lights, and marker lights • Night Run: All electrical systems and engine on including; headlights, parking lights, marker lights, and interior light system
• Night Park: Same as “Off” except that marker lights, destination signs, parking lights, curbside interior lights, and instrument panel lights are on
Maximum Service Temperature: The maximum temperature to which a container/cylinder will be subjected in normal service.

Metallic Hose: A hose whose strength depends primarily on the strength of its metallic parts; it can have metallic liners or covers, or both.

Metering Valve: A valve intended to control the rate of flow of natural gas.

Module: An assembly of individual components.

Motor (Electric): A device that converts electrical energy into mechanical energy.

Motor (Traction): An electric motor used to power the driving wheels of the bus.

Operating Pressure: The varying pressure developed in a container during service.

Physical Layer: The first layer of the seven -layer International Standards Organization (ISO) Open Systems Interconnect (OSI) reference model. This provides the mechanical, electrical, functional and procedural characteristics required to gain access to the transmission mediu m (e.g., cable) and is responsible for transporting binary information between computerized systems.

Pipe: Nonflexible line.

Power: Work or energy divided by time.

Power Density: Power divided by mass, volume or area.

Pressure Relief Device (PRD): A pressure and/or temperature activated device used to vent the container/cylinder contents and thereby prevent rupture of an NGV fuel container/cylinder, when subjected to a standard fire test as required by fuel container/cylinder standards.

Propulsion Power As sembly (PPA): System that provides propulsion for the vehicle proportional to operator commands. Includes; engine, transmission, cooling and other applicable systems (See SP-01).

Primary Power Unit (PPU): System that provides propulsion power for the vehicle proportional to operator commands. Includes; controllers, energy conversion, electric drive, cooling and other applicable systems (See SP-01).
15 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Radiator Package: Complete system with accessories necessary for operation. Package shall include at a minimum; heat exchanger(s), cooling fan (s), electronic controller (s) with diagnostic communications and alternator if applicable.

Real-Time Clock (RTC): Computer clock that keeps track of the current time.

Regenerative Braking: Deceleration of the bus by switching motors to act as generators, which return vehicle kinetic energy to the energy storage system.

Rejectable Damage: In terms of NGV fuel containers/cylinders, this is damage as outlined in CGA C -6.4, “Methods for External Visual Inspection of Natural Gas Vehicle Fuel Containers and Their Installations,” and in agreement with the manufacturer’s recommendations.

Response Time: Response times shall be measured from the activation or deactivation of the accelerator or brake pedal to the initial response of an on-board accelerometer measuring longitudinal Bus acceleration. Response times for power to brake, brake to power, coast to power and coast to brake shall be no greater than 0.20 seconds.

Retarder: Device used to augment or replace some of the functions o f primary friction based braking systems of the bus.

Rupture: Sudden and unstable damage propagation in the structural components of the container resulting in a loss of contents. See Leakage.

Seated Load: 150 pounds for every designed passenger seating position and for the driver.

SLW (Seated Load Weight): Curb weight plus seated load.

Serial Data Signals: A current loop based representation of ASCII or alphanumeric data used for transferring information between devices by transmitting a sequence of individual bits in a prearranged order of significance.

Service Life: The Bus shall be designed to operate in transit service at least 40,000 miles per year for 12 years or 500,000 miles.

Service Pressure: The settled pressure at a uniform gas temperature of 21°C (70°F) and full gas content.

It is the pressure for which the equipment has been constructed, under n ormal conditions. Also referred to as the nominal service pressure or working pressure.

Settled Pressure: The gas pressure when a given settled temperature, usually 21°C (70°F), is reached.

Settled Temperature: The uniform gas temperature after any change in temperature caused by filling has dissipated.

Simplified Technical English (STE): A set of writings rules that guide non -English speaking technician writers. Four steps are used to establish a simplified technical dictionary:
• Keyword
• Approved meaning
• Approved example
• What is not approved (sample sentences)
Solid State Alternator: A module that converts high -voltage DC to low -voltage DC (typically 12/24 volt systems).
16 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Sources of Ignition: Devices or equipment that because of their modes of use or operation, are capable of providing sufficient thermal energy to ignite flammable compressed natural gas -air mixtures when introduced into such a mixture, or when such a mixture comes into contact with them.

Special Tools: Tools not normally stocked by the LACMTA.

Specification: A particular or detailed statement, account or listing of the various elements, materials, dimensions, etc. involved in the manufacturing and construction of a product.

Standard: A firm guideline from a consensus group.

Standards: Standards referenced in “Technical Specifications” are the latest revisions unless otherwise stated.

Standee Line: A line marked across the bus aisle to designate the area s that passengers may not occupy when the bus is moving.

State of Charge (SOC): Quantity of electric energy remaining in the battery relative to the maximum rated amp-hour (Ah) capacity of the battery expressed in a percentage. This is a dynamic measurement used for the energy storage system. A full SOC indicates that the energy storage system cannot accept further charging from charging device or the regenerative braking system.

Stress Loops: The “pigtails” commonly used to absorb flexing in piping.

Structure: The basic body, including floor deck material and installation, load -bearing external panels, structural components, axle mounting provisions and suspension beams and attachment points.

Tamper Resistant: Fasteners or components that cannot be easily removed or modified using pocket knives, coins, or other similar items commonly carried by passengers.

Thermally Activated Gas Relief Device: A relief device that is activated by high temperatures and generally contains a fusible material.

Vestibule: Area in front of the standee line, including Operator’s area.

Wheelchair: A mobility aid belonging to any class of three - or four -wheeled devices, usable indoors, designed for and used by individuals with mobility impairments, whether operated manually or powered. A “common wheelchair” is such a device that does not exceed 30 inches in width and 48 inches in length measured two inches above the ground, and does not weigh more than 600 pounds. when occupied.

Wheelchair Ramp: A device for allowing ingress and egress of persons or wheelchairs between ground or curb level and the floor level of the bus. The terms “wheelchair ramp” and “ramp” are used interchangeably in this specification.

Zero Emission Bus, (ZEB): A bus meeting California Air Resources Board zero emission standard.

TS 2.1 Abbreviations
Abbreviation and Acronyms
A/C air conditioning
ABS anti-lock braking system
AC alternating current
ACQ alkaline copper quaternary
ADA Americans with Disabilities Act
AFSS automatic fire suppression system
17 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Ah amp hour
ALR auto-locking retractor
ANSI American National Standards Institute
APA The Engineered Wood Association, formerly the American Plywood Association APC Automatic Passenger Counter
APTA American Public Transportation Association
ASHRAE American Society of Heating, Refrigerating, and Air Conditioning Engineers ASTM ASTM International, formerly the American Society for Testing and Materials ATC Automatic Traction Control
ATMS Advanced Transportation Management System
AVA Automated Voice Annunciation
AVL Automatic Vehicle Location
AWG American Wire Gauge
AWS American Welding Society
BAFO Best and Final Offer
BMCS Bureau of Motor Carrier Safety
BMS Battery Management System
BRT Bus Rapid Transit
CALOSHA California Occupational Safety and Health Administration CAL TITLE 13 California Code of Regulations, Title 13, Motor Vehicle Code CAN Controller Area Network
CARB California Air Resources Board
CBD Central Business District
CCS climate control system
CCTV closed-circuit television
cfm cubic feet per minute
CGA Compressed Gas Association
CNG compressed natural gas
CSA Canadian Standards Association
dB decibel
DBE disadvantaged business enterprise
DC direct current
DDU driver display unit
DEF diesel exhaust fluid
DOT Department of Transportation
DPF diesel particulate filter
ECM engine control and monitoring
ECS emission control system
ELR emergency locking retractor
EMI electromagnetic interference
EPA Environmental Protection Agency
ESS energy storage system
FEA finite element analysis
FEMA failure mode effects analysis
FM Factory Mutual
FMCSA Federal Motor Carrier Safety Administration
FMCSR Federal Motor Carrier Safety Regulations
FMVSS Federal Motor Vehicle Safety Standards
Ft. foot or feet
FTA Federal Transit Administration
GAWR gross axle weight rating
GPS global positioning system
GVW gross vehicle weight
GVWR gross vehicle weight rating
18 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 H-point hip-point
EDS electric drive system
HMI human-machine interface
ESC electric system controller
HV high voltage
HVAC heating, ventilation and air conditioning
IBSS Incident Based Surveillance System
I/O input/output
IEEE Institute of Electrical and Electronics Engineers
In. inch or inches
ISO International Standards Organization
LAN local area network
lb. pound
lbs. pounds
LCD liquid crystal display
LED light emitting diode
LEL lower explosive limit
LV low voltage
mA milliampere
MDT mobile data terminal
MPa mega-Pascal
MTTF mean time to fix
NC normally closed
NFPA National Fire Protection Association
NGV natural gas vehicle
NOx nitrogen oxide
NO normally open
NTP notice to proceed
OCU operator control unit
OEM original equipment manufacturer
OSI Open Systems Interconnect
PA public address system
PMO project management oversight
PPA propulsion power assembly
PPU primary propulsion unit or prime power unit
PPV price per vehicle
PRD pressure relief device
psia pounds per square inch absolute
psi pounds per square inch
RF radio frequency
RFI radio frequency interference
rms root mean square
RTC real-time clock
SAE SAE International, formerly the Society of Automotive Engineers SAS silent alarm system
scf standard cubic feet
scfm standard cubic feet a minute
SLW seated load weight
SOC state of charge
SPI Society of the Plastics Industry
UFS Universal Fare System
UL Underwriters Laboratories
UNECE United Nations Economic Commission for Europe
USDHEW United State Department of Health, Education, and Welfare 19 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 V volt or volts
VAC volt or volts AC
VDC volts of direct current
Wh watt-hours
VIN vehicle information number
ZEB zero emission bus
TS 3. Referenced Publications
The documents or portions thereof referenced within this specification shall be considered part of the requirements of the specification. The edition indicated for each referenced document is the current edition, as of the date of the LACMTA issuance of this specification.

TS 4. Legal Requirements
The Contractor shall comply with all applicable federal, state and local regulations. These shall include but not be limited to ADA, as well as state and local access ibility, emissions, safety and security requirements. Local regulations are defined as those below the state level.

Buses shall meet all applicable FMVSS and shall accommodate all applicable FMCSR regulations in effect at location of the LACMTA and the date of manufacture.

In the event of any conflict between the requirements of these specifications and any applicable legal requirement, the legal requirement shall prevail. Technical requirements that exceed the legal requirements are not considered to conflict.

TS 5. Overall Requirements
The Contractor shall ensure that the application and installation of major bus subcomponents and systems are compliant with all such subcomponent vendors’ requirements and recommendations. Contractor and LACMTA shall identify subc omponent vendors that shall submit installation/application approval documents, (including necessary documents and/or diagrams to verify configuration), with the completion of the Pilot and First Article Bus. Components used in the vehicle shall be of heavy-duty design and proven in transit service.

The Contractor shall submit to LACMTA the life expectancy of specified components in LACMTA’s revenue service and duty cycle per the attached list I Life Cycle Cost Submittal Form . The projected life expectancy shall be based upon actual in -service experience wherever practical. If in -service data is not available, the projected life expectancy shall be based upon durability testing utilizing the best applicable industry practices as may be promulgated by such or ganizations as SAE, ANSI, ASTM or other acknowledged industry organizations.

Without exception, all technical information, drawings, nameplates, etc. shall be written in the English language. For all means of communications, i.e., letters, cables, telepho ne conversations, meetings, etc., the English language shall be used. The English System of units shall be used in connection with this Contract.

TS 5.1 Weight
It shall be a design goal to construct each bus as light in weight as possible without degradation of s afety, appearance, comfort, traction or performance.

Buses at a capacity load shall not exceed the tire factor limits, brake test criteria or structural design criteria.

The Contractor shall submit a certified weight slip for the curb weight of each axle as well as the total curb weight of each bus upon delivery.
20 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 5.2 Capacity
The vehicle shall be designed to carry the gross vehicle weight, which shall not exceed the bus GVWR.

TS 5.3 Service Life
The minimum useful design life of the bus in transit service shall be at least 12 years or 500,000 miles. It shall be capable of operating at least 40,000 miles per year, including the 12th year.

TS 5.4 Maintenance and Inspection
Scheduled maintenance tasks shall be related and shall be grouped in maximum mileage intervals. Scheduled maintenance actions such as filter or belt replacements and other adjustments shall not be required at intervals of less than 6,000 miles except for routine daily service performed during fueling operations. Higher levels of scheduled maintenance tasks shall occur at even multiples of not less than 6,000 miles.

Test ports, as required, shall be provided for commonly checked functions on the bus, such as air intake, exhaust, hydraulic, pneumatic, brakes, charge-air and engine cooling systems.

The bus manufacturer shall give prime consideration to the routine problems of maintaining the vehicle. All bus components and systems, both mechanical and electrical, which will require periodic physical work or inspection processes, shall be installed so that a minimum of time is consumed in gaining access to the critical repair areas. To the extent practical, disconnection or removal of components unrelated to a specific maintenance and/or repair task shall be unnecessary. It shall not be necessary to disassemble port ions of the Bus structure and/or equipment such as seats and flooring under seats in order to gain access to these areas.

Relative accessibility of components, measure in time to gain access, shall be prioritized for items requiring more frequent service.

Bus shall be designed to facilitate the disassembly, reassembly, servicing or maintenance, using tools and equipment that are normally available as standard commercial items. Bus design shall include features that maximize the intervals between scheduled service requirements for major bus systems while minimizing service time needed to perform the preventative maintenance work. Design goal shall be to minimize diagnostic time required for major bus systems repair.

Requirements for the use of unique specialized tools will be minimized. The body and structure of the Bus shall be designed for ease of maintenance and repair. Individual panels or other equipment that may be damaged in normal service shall be repairable or replaceable. Ease of repair shall be related to the vulnerability of the item to damage in service.

Contractor shall provide a list of all special tools and pricing required for maintaining this equipment. Said list shall be submitted as a supplement to Form PF-3-Schedule B of Prices Special Tools.

NOTE: Tools such as compartment door keys, bellows gauges and other tools that are required for daily maintenance and inspections shall not be included in the special tool list and shall be furnished for each bus.

TS 5.5 Interchangeability
Unless otherwise agreed, all units and components procured under this Contract, whether provided by Suppliers or manufactured by the Contractor, shall be duplicates in design, manufacture and installation to ensure interchangeability among buses in each order group in thi s procurement. This interchangeability shall extend to the individual components as well as to their locations in the buses. These components shall include, but are not limited to, passenger window hardware, interior trim, lamps, lamp lenses and seat assem blies.

Components with non-identical functions shall not be, or appear to be, interchangeable. 21 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Any one component or unit used in the construction of these buses shall be an exact duplicate in design, manufacture and assembly for each bus in each order grou p in this Contract. Contractor shall identify and secure approval for any changes in components or unit construction provided within a Contract.

In the event that the Contractor is unable to comply with the interchangeability requirement, the Contractor must notify the LACMTA and obtain the LACMTA’s prior written approval, including any changes in pricing.

LACMTA shall review proposed product changes on a case -by-case basis and shall have the right to require extended warranties to ensure that product chang es perform at least as well as the originally supplied products.

TS 5.6 Training
The Contractor shall have one or more qualified instructors who shall be available at the LACMTA between the hours of 7:00 a.m. and 5:00 p.m. during the period immediately after acce ptance of the Pilot Bus. Contractor provided Instructor(s) shall conduct regular and “train the trainer” type classes, for various size groups, to advise LACMTA trainers and mechanics on the proper operation and maintenance of equipment. Training shall be provided throughout the Contract period up to the conclusion of the initial Warranty period for the Option Buses, one (1) year following receipt of the final bus.

Base Order Buses
The Contractor shall provide pricing for up to 1,000 Instructor class -room hours with the bus order. The LACMTA shall approve the proposed trainers and their qualifications, proposed subjects and scheduling of the classes conducted by the Contractor at the time of Pilot Bus review. Training shall be provided throughout the Contract period up to the conclusion of the initial Warranty period following receipt of the final Bus.

Option Order Buses
For each Option order, Contractor shall also be required to provide Instructor training. The quantity of training hours shall be determined by the quantity of Option Buses ordered and shall be equal to five hours of training per Option Bus up to a maximum of 500 instructor class-room hours for each Option order. The LACMTA may elect to reduce the amount of training required for the Option orders. The LACMTA shall approve the proposed trainers and their qualifications, proposed subjects and scheduling of the classes conducted by the Contractor.

TS 5.6.1 Training Curriculum
The Contractor shall develop and submit a training curriculum using the most current version Microsoft Office Word and/or Power Point, subject to LACMTA approval . The curriculum will be discusse d during Pre - Production meetings and submitted to the LACMTA no later than 30 days prior to delivery of the Pilot Bus. The curriculum shall be designed specifically for the LACMTA Bus order and shall cover all major systems ordered on the buses including, but not limited to:
• Engine/Propulsion System
• Transmission/Electric Drive
• HVAC System
• Electrical Systems
• Electronic Controls and Sub-systems
• Special Equipment (Fire and Gas Detection, Operator’s seats etc.) • ABS Brake System
• Steering and Suspension
• Pneumatic System
• Passenger Door/Wheelchair ramp system
• Fuel/Battery system and delivery
• Maintenance Bus Orientation
• Operator Bus Orientation
• Security Camera System
22 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 • Bus Defueling Procedures
• Engine/Propulsion Cooling System
• Electronic Cooling System
• PPU
• Energy Storage System (including BMS)
• Automatic Passenger Counter
TS 5.6.2 Teaching Materials
The Contractor shall provide to the LACMTA Maintenance Instruction Department visual and other teaching materials as needed during classroom instruction. Teaching materials shall be s ubject to LACMTA approval.

Typical teaching materials include items such as; printed technical literature, training modules, service training and operating manuals, slides, DVD presentations, overhead presentations, etc.

TS 5.6.3 Optional Training Aids
The items in this section are discretionary and may be purchased through this contract, subject to LACMTA approval.

Special Training Aids
The Contractor shall supply pricing for items a through k, special training aids, as listed below for use by LACMTA training staff . Pricing for these aids is to be provided to the LACMTA on Form PF -5-Schedule D of Prices Training Aids. The Special Training aids are to be provided not later than the delivery date for the first production Bus.

System Simulation Training Boards must be designed to imitate a described bus system and shall be mounted vertically on a sturdy roll around frame. Simulation Boards can be approximately three- foot by six foot and in no case larger than four feet by eight feet. Boards shall not be taller than 7 feet to enable the training boards to pass through doors. Simulation boards shall be provided with a 120 VAC power cord. The use of actual Bus components for simulation is desired; however, extremely bulky or heavy items such as large fan motors, A/C compressor, starter, alternators, engine controls, transmission controls, doors, and other similar devices may be smaller or modeled.

a) One complete running engine and transmission assembly - Including cooling and fueling systems, mounted on a suitable roll around stand.
b) One complete static transmission assembly - For visual purposes, mounted on a roll around stand with considerable cut -away sections that improve visibility and insight into the operation of the transmission.
c) One complete static front axle assembly - For visual purposes, mounted on a roll around stand with considerable cut-away sections that improve visibility and insight into the operation of the front axle assembly.
d) One complete static rear axle assembly - For visual purposes, mounted on a r oll around stand with considerable cut -away sections that improve visibility and insight into the operation of the rear axle assembly.
e) ATECH Electrical Training Board Kits - General electrical training. Kit to include GM Specialized Electronic Trainer, Guide Book, four resistors, dual filament light, blank board and horn.

System Simulation Training Boards:

f) Anti-Lock Brake / Air Brake Board - Fully functional ABS training board. Bendix design bus disc brake air system training board with all air valve and electrical instrumentation. g) Electric Air Conditioning Training Simulator Module - A/C system training board to highlight new system products. Board must be fully functional and shall be made to give mechanics a general 23 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 perspective of A/C and heating compo nents. Module should be similar to what is used during APTA bus Roadeo competitions.
h) Fire Suppression - One complete bus set of equipment on display board of fire and gas detection system
i) Video Security System – One complete bus set of equipment for training simulator including all cameras, DVR and the monitor system.
j) Destination Sign – One complete bus set of equipment for training simulator including all signs, cables and controller.
k) Multiplex Electrical Training Board - A mock -up board, where key components including all functioning switches, modules, lights, diagnostic ports, and diagnostic switches are replicated on a functional model, shall be provided as a tool for diagnostic, design verification and training purposes.

E-Learning/Interactive Training Media
The Contractor shall provide pricing for 25 hours of CNG/Electric Bus interactive learning seat time to LACMTA on Form PF-5 Schedule D of Prices, Training Aids. The media shall provide a high level of student interactivity, including but not limited to: questions review, component identification, tool use, circuit building, component testing. The 25 hours shall be broken down as follows:

TABLE 1
E-Learning Media Hours
CNG Bus Electric Bus
Module # System Hrs. Module # System Hrs.

Module 1 Engine and Transmission 6 Module 1 Safety Procedures 1 Module 2 Electrical System 3 Module 2 Powertrain 4
Module 3 Vehicle Multiplex System 3 Module 3 Electrical System 4 Module 4 HVAC System 2 Module 4 Vehicle Multiplex System 3 Module 5 Brake, Axles, and Air System 4 Module 5 HVAC System 2 Module 6 CNG Fuel System 2 Module 6 Brake, Axles, and Air System 4 Module 7 Entrance/Exit Doors 2 Module 7 PM Procedures 2 Module 8 Cooling System 1 Module 8 Entrance/Exit Doors 2 Module 9 Wheelchair Ramp 1 Module 9 Cooling System 1
Module 10 Towing and Recovery 1 Module 10 Wheelchair Ramp 1 Module 11 Towing and Recovery 1
Each module sh all include: introduction, component operation, component testing, system diagnosis, and diagnostic software/tool use. The content in each module sh all be presented with the following breakdown:
video content (5 -10 percent), slide content with V/O (40 -45 percent), student interactivity (45 percent), skills assessment (5 percent). All modules sh all have LA Metro branding and a full electronic text student handout.

All handouts shall be in MS Word and editable.

The content shall be delivered via DVD, ready for installation and operation al on any platform including Microsoft, MAC and Android. All content shall be developed using HTML5 programming and optimized for web browsing. All content sh all be navigated through an industry standard e -learning programs graphical user interface (GUI) subject to LACMTA approval.

TS 5.6.4 Manuals
Manual Review and Approval
The Contractor shall be solely responsible for the accuracy and completeness of the manuals and the conversion of the Parts manual into Electronic Parts Catalog ( EPC). The LACMTA will assemble a technical review committee to define acceptance criteria of the manuals deliverables, quality standards, file formats, expected results and the testing methods to be used. The Contractor shall put together a team with the technical capabilities to successfully complete these deliverables to LACMTA’s satisfaction. 24 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 The Contractor will be required to participate in Manual Review and Approval process and attend one service manual review meeting held at the LACMTA shortly following LACMTA Notice to Proceed. Except for the Parts Index, t he draft manuals shall be shipped simultaneously with the first Pilot Bus. The final meeting will be scheduled after receipt of draft manuals but prior to the ship date of the first Production Bus.

Draft Manuals
Except for the Parts Index, the Contractor shall provide the LACMTA with draft manuals simultaneously with the Pilot Bus: Draft manuals shall include:
• Ten draft hardcopies each of the Service, Parts and Operator’s manuals plus a list of all proposed OEM Component Repair manuals, simultaneously to the shipping of the first Pilot Bus. • Draft Parts manuals are further defined to include a minimum of 95 percent of all part numbers with an error rate of less than 5 percent. It will be the responsibility of the Contractor to ensure the accuracy of all part numbers.
• Hard copy manuals shall be provided in suitable 3-post binders clearly identified with the Bus manufacturer and model number, LACMTA Bus series number, revision date, and table of contents. • A part number index shall be submitted for review at least 60 days prior to the scheduled ship date of the first production Bus.

Final Manuals
Final DVD editions of Service, Parts and Operator’s manuals must be delivered within 90 days after the start date for production Buses. Following the 90 day period after start of production the LACMTA may withhold $10,000 per Bus delivered until all maintenance and parts manuals are received. • Ten final hardcopy sets of Service and Parts manuals shall be provided for each 100 Buses and 12 total sets for Subsystem OEM manuals.
• For any Option Buses, four hardcopy sets of Service manuals shall be provided for each 10 0 Option Buses.
• Twenty final edition Service and Parts manuals excluding subsystem OEM component manuals shall be provided on DVD
• The Contractor shall supply two final ha rdcopy Operator’s manuals per every 10 buses and five total final electronic copies on DVD.
• Contractor shall supply a listing of diagnostic codes with final service manuals delivered that covers trouble shooting fault trees/codes related to the PPU.

If sep arate subsystem OEM component supplier manuals are provided for preventative maintenance, diagnostics, parts and repair, then the number of manuals provided shall correspond with the quantities described above.

Manuals on DVD
Final edition Service and Parts manuals shall include an index and search function to locate items by subject, part name, or system. Updates shall be delivered to the Maintenance Instruction Department as they occur.

Updates must be identified with effected system and with update revision dates.

The DVD versions shall be provided with licenses which permit the MTA to load the manuals on an unlimited number of MTA computers and/or server units. Neither generic nor poor quality reproductions shall be acceptable. Manuals must be in English. The DVD version may consist of multiple DVDs.

The Contractor must be able to work with the 3rd party EPC provider (Digabit, Inc., 850 Englewood Pkwy. #200, Englewood, CO 80110 (Phone # 303 957 -2822)) directly to convert the ir Parts manual into a n EPC format suitable for use with LACMTA’s current ERP/EAM systems. EPC integration shall include the ability of the contractor to provide information in the current format for initial EPC publishing needs and continue working with the EPC publishing provider using current data formatting standards over the life cycle of the bus. 25 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Manual - Updates
Updates to the manuals covering revisions, corrections or additions shall be grouped and released to the LACMTA as discovered or disclosed by LACMTA at a minimum of once per year but not to exceed three times per year for 12 years. Updates shall be provided in electronic and hardcopy format and shall be delivered to the LACMTA Maintenance Instruction Department. Updates must be identified with defected system and w ith update revision dates.

Service Manuals
Service manuals shall be divided into separate sections as listed below:
a) Preventative Maintenance Procedures (PMP) by component or system - Specifically for use at LACMTA Operating Divisions. Procedures must identify what inspection criteria procedures are needed for each component or system at intervals by time or mileage. Daily inspection is not acceptable criteria for preventative maintenance.
b) Diagnostic Procedures - Include troubleshooting guides for all a ir, fluid, mechanical and electrical systems. Include schematics for fuel, air, hydraulic, coolant, HVAC, multiplex, braking and electrical with wiring harness drawings.
c) Component Repair/Service - The manuals must be organized to show every subsystem in th e bus including all re -buildable components used. For example, the steering box, air compressor, power steering pump, differential, transmission/electric drive/electric drive and PPU must be included.

Component Reference Diagrams must be specific and referenced by exact exploded view diagrams.

PMP Section
PMP manuals shall be specific for the LACMTA’s bus order and shall include the manufactures inspection and maintenance requirements for buses covered by this procurement and shall not contain any unrelated or unnecessary requirements. All routine maintenance schedule requirements, including maintenance of major subsystems, shall be provided in one master PMP matrix. The master PMP matrix shall include; specific service task, service mileage, and PMP service manual section reference. The PMP manual shall also include remove-and replace instructions for all sub -system components including: PPA, engine, transmission, starter, alternator, A/C compressor, air compressor, etc.

Diagnostic Section
Diagnostic manuals which may be integrated with the maintenance manual shall include isometric, phantom, and schematic illustrations as necessary to completely describe each system including but not limited to location and routing of air, hydraulic, water, lines and electri cal harnesses including all anchor and attachment points. Diagnostic manuals shall also include trouble shooting guides necessary to complete running repairs for all supplied Bus equipment.

All wiring schematics and wiring harness drawings required in Service Manuals shall be provided in a separate publication in 11 X 17 inch uniform format. OEM schematics and those provided by all subsystem manufacturers shall be uniform diagrams with an emphasis on readability by mechanics performing diagnostic functions. Drawings shall provide functional grouping, continuity and interfacing at all connection points to eliminate unnecessary interfacing between multiple drawings and subsystem supplier drawings. Electrical schematic drawings shall include diagrams to clearly and accurately show locations of all electrical connectors splice and ground points for the Bus wiring harnesses.

Component Repair/Service Section
Fourteen sets of Repair Manuals necessary to rebuild all Contractor supplied Units including: PPU, transmission/electric drive, HVAC system, starter, alternator, air compressor, etc., shall be provided. Each copy shall be the latest hardcopy edition issued by the OEM component manufacturer. Repair manuals shall be comprehensive and shall cover all aspects of re pair from tear-down through final test as recommended by the Bus OEM. Repair manuals shall be grouped in sets and with a table of contents. Each set shall be organized and mounted onto a suitable table top holding rack subject to LACMTA approval. The LACMTA 26 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 requires fourteen sets of wall posters with the repair manuals showing subsystem, component and part assembly, parts numbers, torque values, installation notes, etc. A list of subsystem component repair manuals shall be submitted for LACMTA review at time of Pilot Bus delivery.

Parts Manuals
Must be specific and referenced by exact exploded -view diagrams and organized to coordinate with Service Manuals for ease of use. Parts manuals shall be specific to the LACMTA bus order including subsystem OEM PPU and transmission/electric drive parts listing s. IPC and EPC manuals provided shall include illustrations with necessary exploded diagrams and data arranged so that part numbers can be readily found and identified in the illustration for each system and subsystem component, assembly, subassembly or piece part, from an orderly breakdown of the complete bus. An assembly or subassembly is an identifiable portion of a component of a system or subsystem.

Parts manuals shall contain a reference part number index, listed in numerical order with descriptions, and page numbers. The comprehensive number index shall include major subsystem parts numbers which includes the PPU, transmission/electric drive/, and air conditioning. A part number index shall be submitted for review at least 60 days prior to the scheduled ship date of the first production bus.

The parts list index shall also be provided to the LACMTA in a PC spreadsheet file on a DVD compatible with Microsoft Excel and include subsystem supplier part numbers, part description, and price. OEM component supplier part numbers are required.

Price List
Ten copies of the current price list shall be pr ovided separately as a supplement to the final parts manuals.

Price lists shall be updated at least annually and provided for the life of the bus as they are updated.

Operator’s Manuals
The Operator manuals shall be specific to the LACMTA bus configuration and designed for a LACMTA Bus Operator target audience, without extraneous material or information. Manuals shall clearly outline the features and controls, indicators necessary for safe and proper operation of the buses including ADA equipment.

TS 5.6.5 Special Equipment
Option, Special Service Equipment
The items in this section are discretionary and may be purchased through this contract, subject to LACMTA approval.

The Contractor shall supply pricing for 30 sets of Special Service Equipment listed below for use by LACMTA training staff. Pricing for this special service equipment is to be provided to the LACMTA on Form PF -4- Schedule C of Prices Special Service Equipment.

The LACMTA is aware th at diagnostic equipment and/or software has been developed or is being developed by many of the OEMs to assist in the maintenance of the Buses. Proposer is required to submit a list of recommended special equipment, software and/or diagnostic tools deemed necessary to provide state -of-the- art service for the bus systems. Depending on the type of available equipment and/or software, the LACMTA may wish to obtain complete sets of such Special Service Equipment and/or software, plus any additional tools identified by the OEM manufacturer required to diagnose, calibrate, or remove -and-replace, all equipment provided with this bus order. The purchase of any such Special Equipment and/or software is at the sole option of the LACMTA. Because of technological change s which may occur prior to and during the actual production of the buses, the LACMTA reserves the right to issue Change Orders for updated diagnostic equipment, tools and software, and other Special Service Equipment at any time prior to Contract closeout.

For the Base order or any Option order that is exercised the Contractor shall provide pricing for Diagnostic Tools and Equipment listed below. The quantities listed below are for 300 Base Vehicles. Quantities for 27 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Diagnostic Tools and Equipment of Option Vehicles will be determined at the time the Option is exercised. At a minimum, Proposers shall provide a complete listing of such currently available equipment and/or software and the proposed pricing in the Price Forms.

Engine/Propulsion and Electric Drive/Transmission:
• Engine/Propulsion Diagnostic software, including necessary cables and connectors with one year software registration.
• Transmission/Electric Drive diagnostic software, including necessary cables and connectors. • PPU diagnostic software, including necessary cables and adapters. • Nexiq Technologies USB Link PC to Vehicle Interface.
• ABS/Regenerative Braking diagnostic software, including necessary cables and connectors. • Engine/Propulsion cooling system diagnostic or programming software. • Power Management diagnostic tools and software.
• Battery Management diagnostic tools and software.

Electrical/Vehicle Control System:
• Multiplex/Vehicle Control software and connection kit to include applicable cables, connectors and translator boxes, no registration or upgrade fees attached. • Diagnostic laptop (to be defined) to include: applicable cables, connectors and translator boxes. • Multiplex Module programmers, (if applicable).

Energy Storage and BMS
• Power management diagnostic software and connection kit to include applicable cables and adapters , including registration fees.

Doors
• Door System diagnostic or programming software.

Interior:
• ITS Diagnostic Kits including test fixture(s) and associated software application(s) that allows for installing componen ts of each group, (Video Security, IBSS and Destination Sign) so that all the components of each group are easily accessible for programming, replacement, adjustment and troubleshooting including but not limited to all cables, DVR docking station, cameras, etc. Diagnostic kits should be integrated with the Training Aids to allow off -the-bus training and familiarization of the systems.
• Destination Sign Diagnostic Equipment (J1708 Protocol Boxes/software).

Heating Ventilation Air Conditioning (HVAC):
 A/C interface software and cable.

Diagnostic PC:
• Diagnostic laptops with necessary interface cables, power adapters.

TS 5.6.6 Diagnostic Laptop PC Specifications
Optional diagnostic laptop shall be Dell Latitude E6540 and at a minimum contain the following:

TABLE 2
Laptop Specifications
Category Description
Processor Intel Core i5-6300U (Dual Core, 2.4GHz, 3M cache) Operating System Windows 7 Professional English, French, Spanish 64 -bit (Includes 28 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Windows 10 Pro License)
Memory 8GB (2x4GB) 2133MHz DDR4 Memory
Hard Drive 500GB 7200rmp 7.2krpm HD
Video Card AMD Radeon RT M360, for I5-6300U (Vpro Capable) Optical Drive Dell External USB Slim DVD+/-RW Optical Drive Battery Primary 4-cell 62W/HR Battery
Adapter 65 Watt AC Adaptor
Power Cord US Power Cord
LCD 15.6-inch HD (1366x768) Anti-Glare LCD
Wireless Intel Dual -Band Wireless -AC 8260 Wi -Fi + BTW8260AC 4.1 Wireless Driver (2x2)
Keyboard Internal Dual Pointing Keyboard, English
Security Hardware Absolute Computrace Complete 5 Year - Education System Management No Out-of-Band System Management
System shall be compatible with all diagnostic software. Contractor shall provide a complete listing of all proposed software and hardware to the LACMTA Project Manager prior to purchasing.

Because of the time delay between the procurement process and receipt of computer equipment, the final laptop computer configuration shall be subject to approval by the LACMTA at delivery to ensure it has all of the appropriate and necessary software and is compatible with LACMTA’ s other existing laptop computers. All laptop PCs shall include a suitable protective carrying “soft” case and a Microsoft mouse.

TS 5.6.7 Recommended Spare Parts List
The Contractor shall attend at least one Parts Provisioning Meeting with the LACMTA’s Inventory P lanning staff to discuss recommended spare parts. The Parts Provisioning meeting shall occur at least 60 days prior to the first production Bus being delivered. At the meeting, the Contractor shall provide a bill of material and a list of recommended spare parts for the buses ordered. The recommended spare parts list shall include the quantity of each item per bus, the estimated normal lead time, and recommended minimum/maximum quantities. As changes are implemented and corrections are made, the recommended spare parts list shall be updated throughout the Contract period and life of the bus. The Contractor Parts subsequently ordered by LACMTA must be delivered within thirty (30) days after initial Bus delivery or within 30 days of placement of the order, whichever is later.

TS 5.6.8 In-Process and As-Built Drawings
The Contractor shall, no later than 30 days prior to commencing production, supply the LACMTA with two sets of hardcopy scale drawings suitable for conducting repairs on every area of the vehicle, including all major systems and sub -system installations. Electrical and air schematics shall also be provided. In addition, the Contractor shall provide a description of the electronic configuration, layout and functionality of the bus including communicat ion paths and power distribution . Drawings shall be organized in a logical , easily searchable format consistent with parts and or maintenance manuals , and shall include a table of contents searchable by parts or systems descriptions.

Drawings shall also be supplied in electronic format compatible with AutoCAD , PRO -E or other LACMTA approved design software. Contractor shall update these specific drawing to conform to "as -built". Five sets of Conforming drawings shall be delivered to the LACMTA within 60 days after final bus delivery.

Drawings shall include at a minimum the following:
• Entire structure of the bus
• Interior body with dimensions
• Exterior body with dimensions
• Floor
• Glazing and frames
29 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 • Engine and Transmission mounts
• PPU installation and mounting
• Fuel containers and supporting structure
• Passenger assists layout
• Seat placement and dimensions
• Passenger door and window dimensions
• Wiring schematics and drawings
• Wiring harnesses and cables drawings
• Plumbing schematics (pneumatic/hydraulic) and drawings • Suspension
• Any specialized bracketry or mounts
• Battery tray
• Paint Scheme
• Interior decal placement
• Exterior decal placement
• Destination Signs drawings and schematics
• Frame Drainage Plan
• AFSS installation and routing
• ADA device installation
TS 5.7 Operating Environment
The bus shall achieve normal operation in ambient temperature ranges of 0º F to 120º F, at relative humidity between 5 percent and 100 p ercent, and at altitudes up to 1 ,500 feet above sea level. Degradation of performance due to atmospheric conditions shall be minimized at temperatures below 0 °F, above 120° F or at altitudes above 1 ,500 fee t. Altitude requirements ab ove 1 ,500 feet will need separate discussions with the engine manufacturer to ensure that performance requirements are not compromised. Speed, grade -ability and acceleration performance requirements shall be met at, or corrected to, 77° F, 29.31 inches Hg, dry air per SAE J1995 with all accessories on including A/C.

TS 5.8 Noise
Noise Level Test Conditions
Instrumentation and other general requirements shall conform to SAE Standard s; J336, J366 and J2805. The bus shall be empty except for test personnel, not to exceed four persons, and the test equipment. All openings shall be closed and all accessories shall be operating at maximum output during the test. The bus shall accelerate at full throttle from a standstill to 35 mph on level commercial asphalt or concrete pavement.

TS 5.8.1 Interior Noise
The combination of inner and outer panels and any material used between them shall provide sufficient sound insulation so that a sound source with a level of 80 dBA measured at the outside skin of the bus shall have a sound level of 65 dBA or less at any point inside the bus. These conditions shall prevail with all openings, including doors and windows, closed and with the engine and accessories switched off.

The bus-generated noise level experienced by a passenger at any seat location in the bus shall not exceed 78 dBA. The driver area shall not experience a noise level of more than 75 dBA. Measurements of interior noise levels shall be taken in accordance with SAEJ2805 for portion of testing under acceleration. The bus shall also be operated at various speeds to check for audible vibrations.

TS 5.8.2 Exterior Noise
Airborne noise generated by the bus and measured from either side shall not exceed 80 dBA under full power acceleration when operated at 0 to 35 mph at curb weight. The maximum noise level generated by the bus pulling away from a stop at full power shall not exceed 83 dBA. The bus-generated noise at curb idle shall not exceed 65dBA. If the noi se contains an audible discrete frequency, a penalty of 5 dBA shall be added to the 30 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 sound level measured. The Contractor shall comply with the exterior noise requirements defined in local laws and ordinances identified by the LACMTA and SAEJ366.

The bus builder shall minimize all transient noises generated by the bus and/or by accessories. These efforts shall include the application of mufflers on exhaust air ports for the kneeling valve, dryer and brake exhaust if their sound levels exceed 78 dBA interior or 83 dBA exterior.

TS 5.9 Fire Safety
The bus shall be designed and manufactured in accordance with all applicable fire safety and smoke emission regulations. These provisions shall include the use of fire -retardant/low-smoke materials, fire detection systems, bulkheads and facilitation of passenge r evacuation. A barrier shall separate the passenger and drive system compartments and shall incorporate fire resistant materials to create a firewall. Contractor must provide required certificates of compliance prior to manufacture of the Pilot Bus.

TS 5.9.1 Materials
All materials used in the construction of the passenger compartment of the bus shall be in accordance with the Recommended Fire Safety Practices defined in FTA Docket 90 -A, most recent revision . Materials entirely enclosed from the passenger compartment, such as insulation within the sidewalls and sub -floor, need not comply. In addition, smaller components and items, such as seat grab rails, switch knobs, small light lenses, door seals, window seals, steering wheel, steering column and escape hatches shall be exempt from this requirement.

TS 5.10 Fire Suppression
The purpose of the suppression system is to ensure bus and passenger safety and survivability in the event of a fire. The AFSS system design shall include sensors and nozzles in all areas that are known to commonly have bus fires.

The AFSS system shall meet or exceed the environmental requirements of SAE J1211 and be approved by Underwriters Laboratory or Factory Mutual. At a minimum, t he engine compartment, rear-mount HVAC compartment, exhaust area and high current electrical areas (except the battery compartment) at rear of bus shall be equipped with an automatic fire sensing and suppression (AFSS) system product, subject to LACMTA approval during proposal period.

AFSS Operation
The AFSS syst em shall be powered through the solenoid battery cutoff switch(es) and be activated automatically by the AFSS system sensors. The AFSS shall provide a programmable time -delayed signal to the engine shut-down controls following detection of a fire. The AFSS initiated engine shut-down shall include an integrated Engine Stop Over -Ride to permit the Operator more time, if required, to slow and stop the Bus (Refer to Section TS 46.5 Table 9).

The AFSS sensors shall detect fires in monitored areas and immediately activate the fire alarm signal in the Operator's compartment and fire warning light on the Operator's indicator panel. The AFSS system shall activate fast-acting extinguisher(s) which release suppression agent to all areas monitored. If water based, the distribution system shall utilize nozzles for high -pressure water mist, and shall deliver water droplets between 50-80µm (micrometer). After a system discharge, the AFSS shall be able to clear alarm condition and be ready for reactivation following a simple system reset. The only cost to prepare system for reuse will be for recharge of agent and clean up.

AFSS Monitor Panel
The system shall have a supervision monitoring panel located abo ve the Operators’ side console subject to LACMTA approval in Pre-Production meetings. Monitor panel shall include visual indicators for a) Operational Status, for sensors, harness, and extinguishers, b) Fire or system discharged, and c) Power Failure. Monitor 31 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 panel shall be capable of identifying each individual sensor (gas or fire) and location of each sensor. Monitor panel shall be capable of recording and storing system events in non -volatile memory. In the event of power loss, events shall still be retrievable after power is restored.

AFSS Sensor
Linear heat detectors shall be mechanically protected from abrasion with use of a spring wire external jacket.

All heat sensors shall be installed per the manufacturer’s recommendations to sensor fires , extreme temperatures or conditions that are sufficient to ignite combustible materials in the monitored areas. The AFSS/GDS control module shall provide a f ault signal to the AFS S status indicator located in the Operator’s area in the event of a sensor fa ilure, and the fault shall be traceable to each fire and gas sensor for easy diagnostic purposes. Fault data shall be recorded and accessible even after loss of battery power.

AFSS Agent
The agent shall be approved by Underwriters Laboratory or Factory Mutual Research Corporation and have no ozone depleting property and no global warming potential per USA EPA guidelines.

AFSS Cylinder(s)
The AFSS agent cylinders shall use DOT shippable linear actuators or electric solenoid valves (squibs are prohibited) attached to DOT certified bottles which do not require hydrostatic retest for a minimum of twelve years. Cylinder(s) shall be compatible with suppression agents. Each cylinder shall have a pressure gauge with easy to read "Go -No-Go" type indicator which is visible when the cylinder(s) is installed on the bus. Each agent cylinder shall have a low pressure sensor to monitor agent cylinder pressure from the display panel. Low agent cylinder pressure shall indicate a fault condition on the display panel.

TS 5.11 Gas Detection System (GDS)
GDS system shall be provided to monitor the engine compartment and each separate fuel storage area(s) and shall automatically activate audible and visible alarms in the Operators’ area at levels of the lower explosive limit (LEL), of natural gas (methane), subject to LACMTA approval during proposal period.

GDS Operation
The GDS system shall be powered through the solenoid battery cutoff switch(es) and be activated automatically by the GDS system sensors. The system shall be capable of detecting gas in concentrations from 20 percent to 100 percent of LEL and shall continue to indicate the presence of gas at concentrations above 100 percent LEL. A control button shall be provided to silence the GDS audible alarm. The GDS shall provide a programmable time-delayed signal to the engine shut -down controls following detection of methane 50 percent LEL of the gas selected for fuel as described in TS 46.5 Table 9. The GDS initiated engine shut - down shall include an integrated Engine Stop Over -Ride to permit the Operator more time, if required, to slow and stop the bus (Refer to Section TS 46.5 Table 9). The GDS shall be in full time sampling mode at all times.

GDS Monitor Panel
The system shall have a supervision monitoring panel located above the Operators’ side console area subject to LACMTA approval in Pre-Production meetings. Monitor panel shall indicate operational status of the sensors, harness, and calibration with visual indicators provided on the Operators’ indicator panel. Visual indicators shall include a) System OK (power on and calibrated), b) Gas Alarm, c) Service Required and d) Monitor each gas sensor for trace gas, significant gas, and trouble conditions for ease of system diagnostics..

GDS Calibration
System shall not require calibration. System diagnostics shall not require more than 20 minutes and shall provide traceability to individual sensor failures during diagnostic work. 32 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 5.12 Respect for the Environment
In the design and manufacture of the bus, the C ontractor shall make every effort to reduce the amount of potentially hazardous waste. In accordance with Section 6002 of the Resource Conservation and Recovery Act, the Contractor shall use, whenever possible and allowed by the specifications, recycled ma terials in the manufacture of the bus.

TS 5.13 Water Leak Testing
The roof, windows, windshields, and all doors of all Buses shall be water tested for a minimum of 30 continuous minutes in order that leaks may be detected and corrected. The HVAC shall be turned on only for the first 15 minutes of the test. The water test should replicate a sustained driving rain contacting all surfaces equally. Water spray nozzles shall be located to provide an overlapping pattern to effectively test the full length of the roof, sides, front and back of the bus at a flow rate of 0.04 gal/min/ft2 TS 5.14 Fasteners and Securements
Unless otherwise specified all bolts, nuts and washers shall use Metric or English system dimensions. All bolts, nuts, washers shall be SAE Grade 5 or better and b e designed to resist corrosion for the life of the bus.

Stainless steel fasteners are required for the structure exterior, suspension system, fuel system , HVAC system, PPA area and mirror/camera attachments. Where the bus design requires high -strength fasteners, zinc plated, or phosphate coated (only if zinc is not available) fasteners shall be provided. Zinc plated fasteners may be used in areas requiring welding. Exceptions to the use of stainless steel or zinc plated fasteners shall be approved on a case-by-case basis.

The use of plastic tie wraps shall be limited to bundling small diameter lines (under one-inch diameter); they shall not be used as an attachment device unless a pproved by LACMTA during proposal period. The failure of any number of tie wraps over the life of the bus shall not result in a required repair action or service interruption.

All wire harnesses assemblies and wire bundles over 18 inches long shall be secu red with suitable wire trays or fully wrapped PTFE or Nylon insulated P-clamps, or other suitable method approved by the LACMTA. P - clamps not used for wiring support shall be orange, fully wrapped silicone insulated. The use of plastic tie wraps shall be l imited to bundling wires; they shall not be used as a primary attachment device unless approved by LACMTA during proposal period. The failure of any number of tie wraps shall not result in a required repair action or service interruption. Support s for wires, cables, or harnesses shall be insulated from contact with wire, cable or harness by a fully cushioned, non -conductive material. Supports for all electrical cables, harnesses and bundles will be subject to LACMTA approval during proposal period and shall be of premium quality.
33 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 DIMENSIONS (TS 6)
TS 6. Physical Size
With exceptions such as exterior mirrors, marker and signal lights, bumpers, fender skirts, washers, wipers, ad frames, cameras, object detection systems, bicycle racks, feelers and rub-rails, the bus shall have the following overall dimensions as shown in Figure 1 at static conditions and design height.

FIGURE 1
Transit Bus Exterior Dimensions

TS 6.1 Bus Length
For ease of use, the following tolerances will be allowable for each given bus length.

Body Length - 40 feet
Length Over Bumpers –40-1/2 feet to 44 feet
TS 6.2 Bus Width
TS 6.2.1 Transit Bus
102 inches Width Bus
Body width shall be 102 inches (+0, -1 inch).

TS 6.2.2 Commuter Bus
Not applicable.

34 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 6.3 Bus Height
Maximum Overall Height
Maximum overall height shall be 135 inches, including all rigid, roof -mounted items such as A/C, exhaust, fuel system and cover, etc.

TS 6.4 Step Height
TS 6.4.1 Transit Bus
The step height shall not exceed 16.0 inches at either doorway without kneeling. A maximum of two steps are allowed to accommodate a raised aisle floor in the rear of the bus.

TS 6.4.2 Commuter Bus
Not applicable.

TS 6.4.3 Articulated Bus
Not applicable.

TS 6.5 Underbody Clearance
The bus shall maintain the minimum clearance dimensions as defined and shown in Figure 2, regardless of load, up to the gross vehicle weight rating.

TS 6.6 Ramp Clearances
The approach angle is the angle measured between a line tangent to the front tire static loaded radius arc , (axle centerline), and the initial point of structural interference forward of the front tire to the ground.

The departure angle is the angle measured between a line tangent to the rear tire static loaded radius arc , (axle centerline), and the initial point of structural interference rearward of the rear tire to the ground.

The break over angle is the angle measured between two lines tangent to the front and rear tire static loaded radius arcs, (axle centerlines), and intersecting at a point on the underside of the vehicle t hat defines the largest ramp over which the vehicle can roll.

TS 6.7 Ground Clearance
Ground clearance shall be no less than 8.5 inches, (eight inches at jacking pad) except within the axle zone and wheel area.

Axle zone clearance, which is the projected area between tires and wheels on the same axial centerline, shall be no less than 5.4 inches.

Wheel area clearance shall be no less than six inches for parts fixed to the bus body and five inches for parts that move vertically with the axles.

TABLE 3
Default Breakover Angle
Angle 30 to 45 ft. Bus
Approach 9 deg. (min.)
Front breakover 8 deg. (min.)
Departure 8.5 deg. (min.)
35 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 – FIGURE 2
Transit Bus Minimum Road Clearance

TRANSIT BUS MINIMUM ROAD CLEARANCE
REAR FRONT½ WHEEL BASE
18” 24”
24”18”
45 o
45 o
WHEEL
AREA
WHEEL
AREA
45 o
45 o

DEPARTURE
ANGLE

APPROACH
ANGLE

BREAKOVER
ANGLE
AXLE
ZONE
AXLE
ZONE

TRANSIT BUS MINIMUM ROAD CLEARANCE
REAR FRONT½ WHEEL BASE
18” 24”
24”18”
45 o
45 o
WHEEL
AREA
WHEEL
AREA
45 o
45 o

DEPARTURE
ANGLE

APPROACH
ANGLE

BREAKOVER
ANGLE
AXLE
ZONE
AXLE
ZONE

TS 6.8 Floor Height
TS 6.8.1 Transit Bus
Height of the step above the street shall be no more than 16 inches measured at the centerline of the front and rear doorway. All floor measurements shall be with the bus at the design running height and on a level surface and with the standard installed tires. A maximum of two steps are allowed to accommodate a raised aisle floor in the rear of the bus.

TS 6.8.2 Commuter Bus
Not applicable.

TS 6.9 Interior Headroom
Headroom above the aisle and at the centerline of the aisle seats shall be no less than 78 inches in the forward half of the bus tapering to no less than 74 inches forward of the rear settee. At the centerline of the window seats, headroom shall be no lowe r than 65 inches reducing to 60 inches at the side wall , except for parcel racks and reading lights, if specified. Headroom at the back of the rear bench seat may be reduced to a minimum of 56 inches, but it shall increase to the ceiling height at the fron t of the seat cushion. In any area of the bus directly over the head of a seated passenger and positioned where a passenger entering or leaving the seat is prone to strike his or her head, padding shall be provided on the overhead paneling.

TS 6.10 Aisle Width
The minimum clear aisle width between pairs of transverse seats with all attached hardware shall be at least 22 inches.

The aisle width between the front wheelhouses shall be at least 35.5 inches, and the entire area between the front wheelhouses shall be available for passengers and mobility aid devices. 36 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 VEHICLE PERFORMANCE (TS 7-TS 8)
TS 7. Power Requirements
The propulsion system shall be sized to provide sufficient power to enable the bus to meet the defined acceleration, top speed and grad e-ability requirements, and operate all propulsion -driven accessories using actual road test or dynamometer results and computerized vehicle performance data.

TS 7.1 Top Speed
The bus shall be capable of achieving a top speed of 65 mph on a straight, level road at GVWR with all accessories operating. The bus shall be capable of safely maintaining the vehicle speed for the discrete bus range specified in proposed bus.

NOTE: Values are assumed to be sustained. Manufacturer shall supply LACMTA with data, if there is a variance between peak performance and sustained vehicle performance.

TS 7.2 Grade-ability
Grade-ability requirements shall be met from a standing stop on grades with a dry commercial asphalt or concrete pavement at GVWR with all accessories operating.

The propuls ion system shall enable the bus to achieve and maintain a speed of 40 mph on a 2 .5 percent ascending grade and 15 mph on a 10 percent ascending grade for the discrete bus range specified in proposed bus.

NOTE: Values are assumed to be sustained. Manufacturer shall supply LACMTA with data, if there is a variance between peak performance and sustained vehicle performance.

TS 7.3 Acceleration
TS 7.3.1 Acceleration (CNG)
The acceleration shall meet the requirements in Table 4 below and shall be sufficiently gradual a nd smooth to prevent throwing standing passengers off -balance. Acceleration measurement shall commence when the accelerator is depressed.

TABLE 4a
Maximum Start Acceleration Times on a Level Surface1
Speed (mph) Maximum time
(seconds)
10 5
20 10
30 18
40 30
50 60
Top speed

1. Vehicle weight = GVWR
Jerk
The rate of change of acceleration shall be minimized throughout the acceleration/deceleration range and shall not be greater than 15.5 mph/sec/sec (0.3g/sec)
37 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Response Time
Response times shall be measured from the activation or deactivation of the accelerator or brake pedal to the initial response of an on -board accelerometer measuring longitudinal Bus acceleration. Response times for power to brake, brake to power, coast to power and to brake shall be no greater than 0.20 seconds.

TS 7.3.2 Acceleration Electric or Zero Emission
The propulsion and braking systems shall meet the performance requirements of the Duty Cycle.

Braking application and performance shall remain consistent regardless of EV system State of Charge (SOC) or other variances related to regenerative braking.

The system shall be programmable to allow optimization of acceleration and deceleration rate. Performance may be affected when reprogramming.

TABLE 4b
Maximum Start Acceleration Times on a Level Surface1
Speed (mph) Maximum time
(seconds)
10 5
20 10
30 18
40 30
50 60
Top speed

1. Vehicle weight = GVWR
Jerk
The rate of change of acceleration shall be minimized throughout the acceleration/deceleration range and shall not be greater than 15.5 mph/sec/sec (0.3g/sec)
Response Time
Response times shall be measured from the activation or deactivation of the accelerator or brake pedal to the initial response of an on -board accelerometer measuring longitudinal Bus acceleration. Response ti mes for power to brake, brake to power, coast to power and to brake shall be no greater than 0.20 seconds.

TS 7.3.3 Acceleration (Commuter Bus)
Not applicable.

TS 7.4 Operating Range
The operating range of the Bus shall be designed to meet the operating profile as stated in the applicable section and performance requirements as stated below.

TS 7.4.1 Diesel (Transit Bus)
Not applicable.

TS 7.4.2 Diesel (Commuter Bus)
Not applicable.
38 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 7.4.3 CNG
A compressed natural gas fuel system consistin g of fuel cylinders, filler provisions, fuel lines, pressure reduction, and auxiliary equipment necessary to safely operate under all operating conditions shall be provided. The Contractor shall provide sufficient fuel capacity to give the Bus a 400 -mile range before the low fuel warning light comes on. The 400-mile range shall be based on:
 A service cycle that utilizes only the CBD portion of the FTA ADB heavy-duty transit bus cycle as administered by The Altoona Bus Research and Testing Center.  The CBD portion shall be further modified to add 20 minutes of idle time.

The Contractor shall provide the LACMTA with a technical analysis which supports the proposed CNG fuel system design compliance to the LACMTA’s range of operation requirement including the pr oposed fuel capacity. The analysis shall contain at a minimum:
 Source of fuel economy information (pounds per mile or standard cubic feet per mile).  Summary of the gas quality used in the calculations.
 Bus condition including weight.

The analysis shall use the natural gas data supplied below based on 70 ° F ambient temperature.

TABLE 5
LACMTA CNG Fuel Properties
Lower Heating
Value
Btu/lb.

Molecular
Weight
Density
@ 3,614.7 psia
Density
@ 14.7 psia
Specific
Gravity
21904 16.734 12.49 lb./cu ft. 0.044 lb./cu ft. 0.580
The analysis shall be provided with the Proposal.

The system shall be capable of refueling at a minimum rate of 5,000 scfm.

TS 7.4.4 Electric (Zero Emission)
The Contractor shall provide sufficient energy storage and changer charging systems to give the bus a cumulative 300-ile daily operating range before the low power warning light comes on. The 300-mile range shall be based on:
• A service cycle that utilizes only the CBD portion of the FTA ADB heavy-duty transit bus cycle with all accessories operating at full capacity.
• The CBD portion shall be further modified to add 20 minutes of idle time.

The Contractor shall provide the LACMTA with a technical analysis which supports the proposed energy storage and charger systems desi gn compliance to the MTA’s range of operation requirement including the proposed energy storage system capacity. The analysis shall contain at a minimum:
• Source of energy storage and charger systems information (kilowatt-hour per mile). • Bus condition including weight.

TS 8. Fuel Economy
Test results from the Altoona fuel economy tests or other applicable test procedures shall be provided to the LACMTA. Results shall include vehicle configuration and test environment information. 39 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 POWERPLANT (TS 9-TS 19)
TS 9. Engine
The Propulsion Power Assembly (PPA) shall consist of an engine and transmission, and support equipment mounted in a compartment in the rear of the bus in T-drive configuration. . The propulsion system shall be designed to minimize exhaust emissions and maximize fuel economy while meeting the specified performance requirements.

Prior to manufacturing the Pilot Bus, the Contractor shall coordinate a technical review with the LACMTA and engine and transmission suppliers covering integration and installation de sign. As part of the technical review, the Contractor shall advise the LACMTA concerning engine and transmission features and control system options, and accessories, and shall conform, to the degree possible, to those already in use at the LACMTA in an effort to increase component and system commonality.

Prior to start of production, the Contractor shall provide documentation from the Sub -suppliers, which supports their approval, that the engine and transmission installation, support system design, and com ponents used specifically for the LACMTA’s contract meet the OEM requirements and recommendations.

The engine shall comply with applicable local, state, and/or federal emissions and useful life requirements.

Components of the fuel management and/or control system shall have a design life of not less than 150,000 miles without replacement or major service. The lifetime estimate shall be based on the defined design operating profile while operating under conditions in TS 5.7.

The engine shall be equipped with an electronically controlled management system (ECM), compatible with either 12 - or 24 -volt power distribution. The engine control system shall be capable of transmitting and receiving electronic inputs and data from other drivetrain components and broadc asting that data to other vehicle systems. Communication between electronic drivetrain components and other vehicle systems shall be made using the communications networks. The engine’s electronic management system shall monitor operating conditions and pr ovide instantaneous adjustments to optimize both engine and bus performance.

The system shall be programmable to allow optimization of parameters or adjustable features.

The engine starting system shall be protected by an interlock that prevents its engage ment when the engine is running. Special equipment or procedures may be employed to start the bus when exposed to temperatures less than 30° F for a minimum of four hours without the engine in operation. The integration of all systems on the vehicle relati ve to engine idle speed shall be the responsibility of the vehicle manufacturer to meet the requirements of LACMTA.

The engine control system shall protect the engine against progressive damage. The system shall monitor conditions critical for safe operati on and automatically de -rate power and/or speed and initiate engine shutdown as needed.

The engine shall be designed for city transit bus application. The engine shall be designed to operate without failure for 300,000 miles in LACMTA revenue service without major failure or significant deterioration.

Electronic controls, supplied by the OEM engine manufacturer, such as throttle control, programmable control module(s), and engine protection system, shall be provided and integrated with other bus electronic systems.

Automatic Engine Protection/Shutdown Override Feature
A control shall be available to the Operator that when depressed and released will delay the engine shutdown for 30 seconds to allow the bus to be moved. Override action shall be recorded. This data shall be retrievable by the LACMTA.
40 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 9.1 Engine (CNG)
The engine shall meet all regulatory requirements when operating on fuel equal to CARB Specifications for Compressed Natural Gas #2292.5. The four predominant characteristics that must be met are Methane, Ethane, Butane, and Propane.

Standard Requirements for a Fast Idle Device
The engine shall be equipped with an operator -controlled fast idle device. The fast idle control shall be a two - way switch mounted on the dash or side console and shall activate only with the transmission in neutral and the parking brake applied. The fast idl e device may be activated and controlled automatically by the control system for heavy loads, e.g. air conditioning.

Oil filtration systems shall be approved by the engine and transmission OEM and be designed with by -pass circuits, as needed, in the event that a filter becomes plugged.

TS 9.1.1 Engine Compartment Control Panel
A rear control panel shall be provided for the convenience and safety of LACMTA mechanics. The control panel shall be located in the engine compartment located in an area where it shall not be damaged during repairs. The control panel wiring, switches, and gauges shall be water proof with IP 65 and IP 67 ratings to withstand steam cleaning.

Control Panel Gauges and Indicators
The following mechanical, electrical dial gauges, or digital display, subject to LACMTA approval during proposal period, shall be mounted on, or adjacent to, the engine compartment control panel:
• Oil Pressure Gauge: 0-100 psi - Accuracy ± 2, psi, shall indicate oil pressure at a main oil galley. • Temperature Gauge: 0-250o F - Accuracy ± 2o F, shall indicate engine block coolant temperature. • Air Filter Restriction Gauge: 0-20 inches H20- Accuracy ± 1 inch. H20, shall indicate air filter restriction.
• Voltage Gauge(s): Battery voltage gauge to monitor both 12 and 24-volt electrical systems with a range of 0-48-Volt.

Engine Panel Controls
The following controls shall be located on the engine compartment control panel:
a) Rear Run Switch: Three-position toggle switch, marked REAR, OFF, and FRONT positions. b) Light Switch: Two-position toggle switch with waterproof cover labeled "Compartment" for control of the minimum of five LED lamps.
c) Engine Start: Starter switch marked "START" shall operate the starter motor only when the rear run switch is in the "REAR" position and transmission is in neutral, and fuel fill door is closed. The Operators start button shall be deactivated when the Rear Run Switch is in “REAR” Position. d) Engine Speed Control: A spring-return control knob or toggle switch marked "ENGINE SPEED" shall be provided that will increase engine RPM from idle to maximum controlled free speed. The switch shall be activated only when the Rear Run Switch is in the "REAR" position, the transmission is in neutral and parking brake set.
e) Diagnostic Test Ports: Additional to the ports required in the Operators’ area per Specification Section TS 46.5 and Table 9.
41 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 9.2 Propulsion System Electric (Zero Emission)
TS 9.2.1 Propulsion System Description
The bus shall be powered by a n electric propulsion system. Function and operation of the bus shall be transparent to the bus operator and passengers. The OEM shall ensure that the bus structure can successfully accept the installation of the propulsion system and be operated on the st ated duty-cycle for a period of 12 years without a structural failure. At a minimum, the propulsion system shall comply with applicable local, state and/or federal emissions and useful life requirements. The propulsion system shall comply with local, state and federal (maintenance) and other applicable sections.

The electric drive system shall be rated for the GVWR or greater of the bus.

TS 9.2.2 Propulsion System Service
The propulsion system shall be arranged so that accessibility for all routine maintenance is ensured. No special tools, other than dollies and hoists, shall be required to remove the p ropulsion system or any subsystems. However, LACMTA shall recognize that properly rated equipment and safety electrical work practices are essential when servicing high -voltage electric components. The air compressor, radiator, all propulsion accessories, and any other component requiring service or replacement shall be easily re moveable. The Contractor shall provide all specialty tools and diagnostic equipment required for main taining the propulsion system in accordance with the Special Tools List.

All compartments and areas that include components using hazardous or high er voltages, shall incorporate safety warning labels to provide appropriate warning for service personnel. A secondary label shall be included to list the voltages in use within the compartment or area. Labels shall be visible when approaching the area.

Labels shall include pictograph symbols for easy recognition.

TS 9.2.3 Primary Propulsion Unit and Traction Motor
The propulsion system may be configured in a variety of methods depending upon type of driver, series and/or parallel. The definition of motor in the context of this specification assumes that the device can provide or consume energy as well as provide or retard mechanical motion.

TS 9.2.4 Energy Storage, Controller and Charging Systems Design and performance shall be provided to LACMTA. Energy storage shall be of a commercial design capable of operating in the LACMTA trans it environment. The primary cha rging of the energy storage system shall be accomplished by the on-board electric system controller and regenerative braking.

Thermal management will be provided to ensure optimal life and performance of the ESS over the environmental operating range.

Energy storage system SOC correction methods stated in SAE J2711 shall be utilized.

Master Disconnect Switch
A single master switch shall be provided near the battery compartment or other appropriate area for disconnecting of all battery positives in the event of an emergency . The location of the master battery switch shall be clearly identified on the exterior access panel, be accessible in less than 10 seconds for deactivation and prevent corrosion when the batteries are washed off or are in normal service.

In the event of a n emergency, turning the master battery switch “Off” with the PPU operating shall shut off the PPU and shall not damage any component of the electrical system. The master battery switch shall be capable of carrying and interrupting the total circuit load. Master battery switch shall be capable of being locked in the “Open” or “Off” position or suitable alternative to prevent accidental turn on. 42 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Shop Charging System
The Contractor shall supply and install battery charger either on the bus or at MTA operating facility capable of recharging the electric/hybrid bus propulsion batteries to a state necessary for the bus to complete a cumulative 300 miles per day according to th e route profile as stated in the “Design Operating Profile”, and section TS 5.7.

On-Route Charging System
If required to meet daily operating range requirement in Section TS 7.4, battery electric buses w ill be outfitted with suitable o n-route charging systems. The charging system shall be an overhead contact system or an in - ground inductive charging system. All charging systems shall allow driver to easily connect without the need of a complex bus guidance system. Connecting to charging system shall not require the driver to leave his/her seat. Safety protocols shall not energize the charging system until the bus is parked in designated charging position, and the charging system is properly interfaced with the bus. Brake and drive interlock shall prevent inadvertent movement of the bus while charging.

TS 9.2.5 Electric System Controller (ESC)
The ESC regulates energy flow throughout electric system components in order to provide motive performance and accessory loads, as applicable, while maintaining critical syst em parameters, (e.g., voltages, currents, temperatures, etc.) within specified operating ranges.

The controller shall monitor the process inputs and ex ecute outputs as appropriate to control the operation of all propulsion system components.

Primary Power Unit (PPU)
The PPU and related emission system shall meet Ca lifornia Air Resources Board (C ARB) standards for zero emissions.

Contractor shall provide LACMTA with expected durability of the PPU and related emissions systems. The PPU shall be equipped with an electrically controlled management system, compatible with multiplex wiring system and either 12- or 24-volt electrical systems.

The PPU shall have on -board diagnostic capabilities, able to monitor vital functions, store out -of-parameter conditions in memory, and communicate faults and vital conditions to service personnel. Diagnostic reader device connector ports, suitably protected against dirt and moistu re, shall be provided in Operator’s area and inside PPU compartment. The on -board diagnostic system shall inform the Operator via visual and audible alarms when out-of-parameter conditions exist for vital PPU functions.

Fuel Cell
The fuel cell power assembly shall consist of fuel cell, electric motor, transmission and support equipment (fuel cell driven bus) or fuel cell, battery, transmission and support equipment (battery dominant fuel cell bus). In both cases, the fuel cell can be of any type (characteri zed by the electrolyte used), however the fuel is limited to hydrogen, only. The fuel cell and its embedded electronics should have a design life of 300,000 miles without failure, significant deterioration, replacement or major service.

TS 9.2.6 Engine
Refer to Section TS 9.1 Engine (CNG).

TS 10. Cooling Systems
The cooling systems shall be of sufficient size and designed to maintain fluids and engine intake air at safe, continuous operating temperatures during the most severe operations possible with the bus loaded to GV WR and with ambient conditions as listed in Section TS 5.7 with a 10 percent minimum reserve capacity in accordance with engine and transmission manufacturers’ cooling system requirements. The cooling system fan 43 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 controls should sense the temperatures of the operating fluids and the intake air, and if either is above safe operating conditions the cooling fan should be engaged. The fan control system shall be designed with a fail - safe mode of “fan on.” The cooling s ystem shall provide functional service while operating in the design operating profile environment.

The cooling system shall be equipped with ethylene glycol base engine coolant approved by the engine manufacturer and compatible with the LACMTA’s existing coolant product. Use of LACMTA’s standard coolant shall not adversely affect the cooling system’s performance. Coolant shall meet the propulsion system manufacturer’s most stringent requirements for coolant properties.

The cooling system shall be self-purging requiring no special procedures to remove air from the system when coolant is installed or added. Quarter-turn ball valves shall permit complete shut-off of both lines for the heating and defroster units. All low points in the cooling system s hall be equipped with drain cocks. The radiator drain plug provided at the radiator shall be a minimum ½ -inch dry break type ( Refer to TS 88.1 for approved products). The drain plug shall be protected from damage and have a provision for attaching a drain adapter for directing the draining fluid into a container. This shall be accomplished without having the coolant drain onto or through any structure of body parts.

The radiator and charge air cooler unit(s) shall be mounted in such a manner to be replaceab le by one LACMTA mechanic within the MTTF specified in TS 88.2. The units shall be easily accessible for cleaning and maintenance by one LACMTA mechanic in less than one hour. Mounting shall be designed so that a LACMTA mechanic can gain full access to the fan side of the units for cleaning without the use of tools. This may be accomplished by swing out design, removable fan shroud section, or suitable inspection door.

For CNG applications, radiator piping shall be stainless steel or brass tubing, if practi cable, hoses shall be eliminated. Necessary hoses shall be impervious to all bus fluids. All hoses shall be secured with stainless steel clamps that provide a complete 360 -degree seal. The clamps shall maintain a constant tension at all times, expanding an d contracting with the hose in response to temperature changes and aging of the hose material. All coolant hoses shall have appropriate sized, constant torque, hose clamps.

TS 10.1 Engine Cooling
A heavy-duty stainless steel radiator surge tank shall provide suffi cient draw down capacity as required by the engine manufacturer. A heavy-duty single glass tube, (non-plastic), shall be provided to determine satisfactory engine coolant level accessible by opening the surge tank access door. A spring -loaded, push -button type valve or lever shall be provided to safely release pressure or vacuu m in the cooling system no more than 65 inches above the ground. Surge tank filler cap shall have a safety lock. A ¼-inch NPT port shall be provided in a convenient location in the surge tank for the LACMTA's pressure testing equipment, subject to LACMTA approval in Pre-Production meetings. The system shall be designed to allow coolant to be added while the cooling system is at full operating temperature incorporating an un-pressurized coolant overflow reservoir.

The radiator shall be of durable corrosion-resistant construction with metal header tanks for CNG bus only. No heat producing components, such as intake charge-air-coolers, or climate control system components shall be mounted between the engine cooling air intake aperture and the radiator. Sensor p ort fittings (1/8-inch NPTF) shall be provided in the upper and lower sections of the radiator to allow the use of thermocouple for diagnostics. Louvered fins are not acceptable.

Self-Cleaning
Radiator and charge air cooler fan(s) shall be electrically driven and capable of reverse operations for periodic self-cleaning of the radiator and charge air cooler. For multiple fans, system shall be designed to prevent air recirculation in the event of individual fan failure.

A cooling system pressure gauge with an operating range of 0-30 psi, easily readable through the surge tank access door, shall be installed to monitor static and operating pressures. 44 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 10.1.1 Radiator Screen
Screen in Front of Radiator
The radiator input shall be protected by an easily cleanable screen designed to collect large debris. Radiators with a fin density greater than 12 fins per inch or a louvered slit design shall not be used. No heat -producing components or climate -control system components shall be mounted between the engine cooling a ir intake aperture and the radiator. The radiator and charge air cooler shall be designed to withstand thermal fatigue and vibration associated with the installed configuration. The radiator and charge air cooler cores shall be easily cleaned (to include engine side core surface) with standard pressure-washing equipment.

TS 10.1.2 Coolant
Standard Requirement for Coolant Filtration
The engine cooling system shall be equipped with a properly sized water filter with a spin -on element. When replacing the water filter, only the water in the filter will be lost.

TS 10.1.3 Fan Drive Design
Electric Fans
The bus shall be equipped with an electric fan drive cooling system. A screen guard must be installed on electric motor fans per SAE J1308. (Refer to Section TS 10.1 Engine Cooling). The cooling system shall be equipped with a master controller with the following capabilities:
a) Multiple electric DC brushless pusher type variable speed fans with electronic feedback controls. b) Communicate on the J1939 CAN data link with system diagnostic reporting via DM1 messaging c) Review and download data via a laptop with service tool software d) Capable of software and calibration up-dates, receiving commands from the engine/PPU e) Sense engine compartment temperature and activate fans if maximum temperature is exceeded. f) Report fault codes by lighting an engine compartment LED flashing light. g) Collect and store cooling system and vehicle performance histogram data. h) If system controller loses communication with the engine /PPU or sensors, it shall direct all fans to go into a default speed mode to avoid vehicle shutdown.
i) If fans lose communication with system controller, they shall go into a default mode to avoid vehicle shutdown.

TS 10.1.4 Mounting
Standard Mounting Design
Mounting location of radiator and charge air cooler shall be the Contractor’s standard design. (Refer to Section TS 10 Cooling Systems).

TS 10.2 Charge Air Cooling
The charge air cooling system shall provide maximum air intake temperature reduction with minimal pressure loss. The char ge air radiator shall be sized and positioned to meet engine manufacturer’s requirements. Air ducting and fittings shall be protected against heat sources and shall be configured to minimize restrictions and maintain sealing integrity.

Charge air piping and fittings shall be designed to minimize air restrictions and leaks.

TS 10.3 Transmission Cooling
The transmission shall be cooled by a dedicated heat exchanger sized to maintain operating fluid within the transmission manufacturer’s recommended parameters of flo w, pressure and temperature. The transmission cooling system shall be matched to retarder and engine cooling systems to ensure that all operating fluids remain within recommended temperature limits established by each component manufacturer. The engine 45 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 cooling system should provide coolant bypass flow to the transmission cooling system with the engine thermostats closed. The heat exchanger will have provisions to drain transmission oil during routine servicing.

TS 10.4 Electric Drive System Cooling
The thermal management system shall maintain electric system components within their design operating temperature limits. Refer to Section TS 10.1 inclusive for additional requirements.

TS 11. Transmission (Conventional Powertrain)
The transmission shall be desig ned for city transit bus application. The transmission shall be multiple speeds, automatic shift with torque converter, retarder , electronic controls, and have integrated oil cooler. Gross input power, gross input torque and rated input speed shall be compatible with the engine. The transmission shall be designed to operate for not less than 300,000 miles on the design operating profile without replacement or major service. The transmission should be easily removable without disturbing the engine and access ible for service.

The electronic controls shall be capable of transmitting and receiving electronic inputs and data from other drivetrain components and broadcasting that data to other vehicle systems. Communication between electronic drivetrain components and other vehicle systems shall be made using the communications networks.

Electronic controls shall provide consistent shift quality and compensate for changing conditions such as variations in vehicle weight and engine power.

The transmission shall be f lushed of any non -synthetic transmission oil and filled with an OEM approved synthetic fluid designed for extended drain intervals. Unless otherwise agreed to in writing, the synthetic transmission oil provided by the Contractor shall be compatible with th e LACMTA’s existing synthetic transmission oil.

A brake pedal application of nominal 6 psi shall be required by the driver to engage forward or reverse range from the neutral position to prevent sudden acceleration of the bus from a parked position.

The electronically controlled transmission shall have on -board diagnostic capabilities, be able to monitor functions, store and time stamp out -of-parameter conditions in memory, and communicate faults and vital conditions to service personnel. The transmission shall contain built -in protection software to guard against severe damage. The on -board diagnostic system shall trigger a visual alarm to the driver when the electronic control unit detects a malfunction.

An electronic transmission fluid level monitoring and protection system shall be provided.

TS 12. Retarder (Transit Bus)
The powertrain shall be equipped with a retarder designed to extend brake lining service life. The application of the retarder shall cause a smooth blending of both retarder and service brake function and shall activate the brake lights.

The retarder application shall be controlled by the throttle pedal and shall be integrated with the ABS system controls so that actuation of ABS shall override the operation of the brake retarder.

Throttle Pedal Activation of the Retarder
The retarder shall apply approximately 1/3 of its total application with a resulting deceleration of no greater than 0.077g when the throttle pedal is completely released. The retarder shall apply approximately 2/3) of its total application with a resulting deceleration of no greater than 0.14g with light brake application. Maximum retarder shall be achieved when brake pedal is fully depressed to engage service brakes, with a maximum resulting deceleration of approximately 0.20 g in an empty bus. The resulting decelerations specified include the effects of engine braking, wind resistance and rolling resistance. 46 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 The thermostatically controlled cooling fan shall be activated when the retarder is engaged and the coolant temperature reaches the maximum operating temperature established by the engine and transmission manufacturers.

Retarder Disable Switch
The retarder disable switch shall be located behind the destination sign door, subject to LACMTA approval in Pre-Production meetings.

Regenerative Braking
The electric propulsion system shall be equipped with a regenerative braking system designed to extend brake lining service life, and capture braking energy to recharge the Energy Storage System. The application of the regenerative braking shall cause a smooth blending of both regenerative brake and service brake function and shall not activate the brake lights independent of the service brake.

Regenerative Braking Disable Switch
The regenerative braking disable switch shall be locate d behind the destination sign door, subject to LACMTA approval in preproduction meetings.

TS 13. Engine Brake (Commuter Bus)
Not applicable.

TS 14. Mounting
All PPA/PPU mounting shall be mechanically isolated to minimize transfer of vibration to the body structure and provide a minimum clearance of 0.75 inches Mounts shall control the movement of the PPA/PPU so as not to affect performance of belt -driven accessories or cause strain in piping and wiring connections to the

PPA/PPU
PPA/PPU mounts shall be manufactured from high grade rubber material and shall last for three years or 150,000 miles, whichever comes first. PPA /PPU mounts shall not deteriorate from contact with oil, heat, and ozone present in the engine compartment.

All air, fuel, fluid, electrical, and other cabling connecting the cradle assembly to the bus, shall have "bulkhead" connections in the proximity of the fire wall to facilitate the replacement of powertrain assemblies. Hoses, cables, and harnesses shall not require unclamping in order to remove the PPA.

TS 14.1 Service
The propulsion system shall be arranged for ease of access and maintenance. The Contractor shall list all special tools, fixtures or facility requirements recommended for servicing. The muffler, exhaust system, air cleaner, air compressor, starter, alternator, radiator, all accessories and any other component requiring service or replacement shall be easily removable and independent of the engine and transmission removal.

No special tools, other than dollies and hoists, shall be required to remo ve the PPA/PPU. Two LACMTA mechanics shall be able to remove, replace, and prepare the complete PPA/PPU assembly for service within a MTTF of 12 -man hours. The MTTF does not include miscellaneous preparation such as placing the bus on stands and removing the bumper, if necessary.

Engine tune -up, PPA /PPU removal and replacement, cylinder heads, and accessories, including, but not limited to muffler, exhaust system, air compressor, alternator(s), starter, and A/C compressor, shall be serviceable from a flat floor and with the use of a pit or hoist.

The Contractor shall provide two suitable dollies for each spare PPA /PPU purchased under this Contract. The Contractor shall mount and ship any spare PPA /PPUs purchased and delivered under this contract onto these 47 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 dollies. The PPA/PPU dollies shall be designed, subject to LACMTA approval in Pre-Production meetings, for long term storage of spare PPA /PPUs and also aid the LACMTA in PPA /PPU replacement to meet the specified MTTF. Use of the PPA/PPU dollies shall be included in the Service manual. The dolly wheels shall be heavy-duty, approximately six inch diameter, with solid steel wheels. The Contractor shall provide the LACMTA with sufficient fabrication drawings needed to manufacture additional dollies.

PPA/PPU driven accessories shall be unit mounted for quick removal and repair. Accessory drive systems including belts shall operate without failure or unscheduled adjustment for 50,000 miles in LACMTA service.

Accessories shall be driven at speeds sufficient to ass ure adequate system performance during extended periods of idle and low route speed operation. To the maximum extent possible, belt drive systems shall be self-adjusting after initial installation adjustment. Belt drives that require manual tensioning shall be designed to facilitate easy service/maintenance, subject to LACMTA approval at the Pre -Production Meeting. Accessory drive belts shall be guarded in accordance with CAL OSHA article 45, Belt and Pulley Drives, Section 4070 "Guarding."
All fillers shall be easily accessible with standard funnels, pour spouts and automatic dispensing equipment.

All fluid fill locations shall be color coded to ensure correct fluid is added: red for transmission fluid, yellow for engine oil. Fill points shall include easy to read labels prominently displayed at the fill point indicating the type and specification of fluid to be added. The engine oil filler cap shall be a spring loaded with sufficient force to retain the cap in a closed position after servicing with no additional action by a service attendant.

All lubricant sumps, including engine, transmission, transmission cooler and hydraulic reservoir, shall be fitted with magnetic type, external, dry break drain plugs of standard size. Any fluid intended to be used on the bus requires a Maintenance Safety Data Sheet (MSDS) to be submitted for LACMTA approval. These fluids shall also be compatible and mixable with the respective LACMTA approved fluids used for the same application.

No engine bypass oil filter.

Engine Oil Pressure and Coolant Temperature Gauges
Engine oil pressure and coolant temperature gauges required in engine compartment.

Engine Air Cleaner
An air cleaner with a dry filter element and a graduated air filter restriction indicator shall be provided. The location of the air intake system shall be designed to minimize the entry of dust and debris and to maximize the life of the air filter. The engine air duct shall be designed to minimize the entry of water into the air intake system. Drainage provisions shall be included to allow any water/moisture to drain prior to entry into air filter.

The engine air inlet system shall be provided which meets the requirements of the OEM engine manufacturer.

The air inlet system shall include a heavy -duty, high dust capacity, dry paper air filter with outside -to-inside air flow with an initial efficiency of 99 percent when tested per SAE Standard J726C, latest edition. The air filter shall be positioned for easy access and service, subject to LACMTA approval during proposal period.

Air inlet piping from the air filter to engine inlet shall use T -bolt type heavy duty, minimum ¾ inch wide, band clamps at all joints. One 1/ 4 inch NPTF test port, with brass plug, shall be provided near the air filter. The test port shall be positioned for easy accessibility with the engine door open.

TS 15. Hydraulic Systems
Hydraulic system service tasks shall be minimized and scheduled no more frequently than those of other major bus systems. All elements of the hydraulic system shall be easily acces sible for service or unit replacement.

Critical points in the hydraulic system shall be fitted with service ports so that portable diagnostic equipment may be connected or sensors for an off -board diagnostic system permanently attached to monitor system operation when applicable. A tamper -proof priority system shall prevent the loss of power steering during operation of the Bus if other devices are also powered by the hydraulic system. 48 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 The hydraulic system shall operate within the allowable temperature rang e as specified by the lubricant manufacturer. Any hydraulically driven system shall be subject to LACMTA approval at the Pilot Bus. The hydraulic system shall be filled with premium approved synthetic oil that will demonstrate a mean time between fluid rep lacements in excess of 50,000 miles. A system shall be provided to easily determine the level of hydraulic fluid in the reservoir.

The system shall be configured and/or shielded so that failure of any line shall not allow hydraulic fluid to spray or drain onto any component operating above the auto ignition temperature of the fluid.

The hydraulic system (steering) shall be located to accommodate easy service. The hydraulic system filter shall be located in the return, low pressure, circuit to the oil reserv oir, or internal to the oil reservoir, subject to LACMTA approval at the Pilot Bus. Sufficient pump cleanable strainers shall be installed to keep the hydraulic pump and system free of contamination. The strainers shall be located for easy access and service.

TS 15.1 Fluid Lines
All lines shall be rigidly supported to prevent chafing damage, fatigue failures, degradation and tension strain.

Lines should be sufficiently flexible to minimize mechanical loads on the components. Lines passing through a panel, frame or bulkhead shall be protected by grommets (or similar devices) that fit snugly to both the line and the perimeter of the hole that the line passes through to prevent chafing and wear. Pipes and fluid hoses shall not be bundled with or used to support electrical wire harnesses.

Lines shall be as short as practicable and shall be routed or shielded so that failure of a line shall not allow the contents to spray or drain onto any component operable above the auto-ignition temperature of the fluid.

All hoses, pipes, lines and fittings shall be specified and installed per the manufacturer’s recommendations. All straight couplings and elbows shall be braided silicone hose with polyester reinforced flame red silicone liner and royal blue cover . The straight couplings and elbows shall meet SAE J20R 3 Class A rating with a temperature range of -65oF to 500oF. All hoses shall be protected from engine exhaust heat which may cause premature failure.

Unless otherwise specified, all hydraulic, fuel, oil, and air lines shall be made with steel tubing. When rigid lines are not practical, flexible fluid lines shall be kept as short as practical. Flexible lines shall be rubber hoses with braided stainless steel jackets except in applications where premium hoses compatible with the fluid type are required. Standard SAE or JIC end fittings shall be used.

Rigid and flexible lines shall be individually supported and readily accessible for inspection and service , including interior lines inside the bus, subject to LACMTA approval in Pre-Production meetings, and shall not touch one another or any part of the bus. Each individual line or hose shall be identified with a steel tag which includes a line number or designator and OEM part number for easy identification.

TS 15.2 Fittings and Clamps
All clamps shall maintain a constant tension at all times, expanding and contracting with the line in response to temperature changes and aging of the line material. The lines shall be designed for use in the environment where they are installed. For example, high-temperature resistant in the engine compartment, resistant to road salts near the road surface, and so on.

All hose clamps shall be stainless steel. All hoses shall have appropriately sized , constant torque, hose clamps.

All fluid lines shall be secured using anchor blocks or suitable securement devices. 49 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Compression fittings shall be standardized to prevent the intermixing of components. Compression fitting components from more than one manufacturer shall not be mixed, even if the components are known to be interchangeable.

TS 15.3 Charge Air Piping
Refer to Section TS 10.2 Charge Air Cooling.

TS 16. Radiator
Refer to Section TS 10.1 Engine Cooling.

TS 17. Oil and Hydraulic Lines
Oil and hydraulic lines shall be compatible with the substances they carry. The lines shall be designed and intended for use in the environment where they are installed. For example, high –temperature resistant in the engine compartment, resistant to road s alts near the road surface, and so on. Lines within the engine compartment shall be composed of steel tubing where practicable, except in locations where flexible lines are required. Flexible lines shall include hose guard shielding with a 450-degree operating range within the engine compartment. High pressure hose ends shall be clamped and secured to prevent movement of line in event of failure of the line or fitting.

Hydraulic lines of the same size and with the same fittings as those on other piping systems of the bus, but not interchangeable, shall be tagged or marked for use on the hydraulic system only.

TS 18. Fuel
TS 18.1 Fuel Lines
Fuel lines shall be securely mounted, braced and supported as designed by the bus manufacturer to minimize vibration and chafing and shall be protected against damage, corrosion or breakage due to strain or wear.

Manifolds connecting fuel containers shall be designed and fabricated to minimize vibration and shall be installed in protected locations to prevent line or manifold damage from unsecured objects or road debris.

Fuel hose and hose connections, where permitted, shall be made from materials resistant to corrosion and fuel and protected from fretting and high heat. Fuel hoses shall be accessible for ease of serviceability.

TS 18.1.1 Fuel Lines, Diesel
Not applicable.

TS 18.1.2 Fuel Lines, CNG
Fuel lines shall comply with NFPA -52. All tubing shall be a minimum of seamless Type 304 stainless steel (ASTM A269 or equivalent). Fuel lines and fittings shall not be fabricated from cast iron, galvanized pipe, aluminum, plastic, or copper alloy with content exceeding 70 percent copper. Lines, fittings, and hoses shall be clear and free from cuttings, burrs or scale. Thread joining material that is impervious to CNG shall be utilized as required. Fuel lines shal l be identifiable as fuel lines only. Fuel lines shall be bent using computer numeric machines (CNC) to assure consistency, no hand bending will be permitted.

The bus manufacturer shall have a documented procedure for testing the high pressure line assembl y in accordance with NFPA 52 requirements.

Fuel lines shall be securely mounted braced and supported using “split-block” type or stainless steel P clamps; all mounting clamps shall be mounted to a rigid structure to minimize vibration and shall be protecte d against damage, corrosion or breakage due to strain, rubbing, or wear. “Floating clamps” (not mounted to a rigid 50 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 structure) shall not be permitted. Fuel lines shall not be used to secure other components (wires, air lines, etc.).

Manifolds connecting fue l containers shall be designed and fabricated to minimize vibration and shall be installed in protected location(s) to prevent line or manifold damage from unsecured objects or road debris.

Fuel hose connections, where permitted, shall be less than 48 inches in length, made from materials resistant to corrosion and action of natural gas, and protected from fretting and high heat and shall be supported approximately every 12 inches Hose support in-between the bus frame and the engine that exceed 12 inches is subject to LACMTA approval during the Pre-Production meeting.

TS 18.2 Design and Construction
TS 18.2.1 Design and Construction, Diesel
Fuel Tank(s)
Not applicable.

TS 18.2.2 Design and Construction, CNG
Fuel Containers/Cylinders
CNG fuel containers/cylinders shall have a minimum service life of 20 years and must be designed, constructed, manufactured, and tested in accordance with the latest revision of at least one of the following:

U.S. Applications:
• NFPA 52-Standard for Compressed Natural Gas (CNG) Vehicular Fuel Systems. • FMVSS 304.
• Any local standard(s) specifically intended for CNG fuel containers.

The design and construction of the fuel system supplied by the OEM shall comply with federal and local regulations.

The fuel cylinders shall have a 3,600 psi service pressure a nd a working pressure of 125 percent the service pressure. The fuel cylinders shall be mounted on the roof in such a manner that replacement of one cylinder shall not require the removal of additional cylinders. The fuel cylinders shall also be clearly mar ked with serial numbers that shall be easily visible to mechanics when installed on the bus. Each cylinder shall have a purchased date no more than six months from the date of released for shipment to the LACMTA.

Fuel cylinder construction shall be in acco rdance with DOT Standard 304, ANSI NGV2, latest revision design and test criteria. Cylinder shall be designed for the lightest weight possible which does not require a hydrostatic re-qualification. Cylinders shall be certified for refueling pressures to 12 5 percent of working pressure during temperature compensated fueling.

Installation
Fuel cylinders shall be installed and tested in accordance with ANSI/IAS NGV2, latest revision, Basic Requirements for Compressed Natural Gas Vehicles (NGV) Fuel Containers and NFPA 52, Compressed Natural Gas (CNG) Vehicular Fuel Systems Code, latest revision, Section 303. In the case of a low floor transit bus, the placement of containers shall be limited to the roof of the vehicle or in the compartment above the engine of the vehicle.

Fuel cylinders, attached valves, pressure relief devices, and mounting brackets should be installed and protected so that their operation is not affected by bus washers and environmental agents such as rain, snow, ice or mud. These components should be protected from significant damage caused by road debris or collision. 51 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 The roof and above the engine mounted containers shall be contained within a skeletal structure resembling a roll cage and contained within an enclosure. The enclosure shall inc orporate a hinged clamshell type access.

The access panels shall be designed to offer protection from weather and to be sacrificial as a means of providing an escape path to atmosphere upon rapid enclosure pressure rise. The latching method shall utilize quick release captive hardware that can be demonstrated to last the life of the bus. Additional shielding shall be provided surrounding end fittings and valves as needed. Shields shall be attached to the bus structure hinged in a manner that permits one mechanic to unlatch and swing the shield open for routine inspections. As practical, electrical components shall not be located within the roof enclosure and if unavoidable, they shall be intrinsically safe.

The cover(s) shall be hinged along the axis of the bus and open to either side providing complete access to the cylinders with mechanic(s) standing on the roof. A safety latch system shall be provided so that the doors when opened cannot inadvertently close during servicing. Failure of the safety latch(es) shall not result in the cover opening while the bus is in operation. The bus roof shall be coated with “anti -slip” paint applied to areas that will accommodate safe access for routine inspections of the fuel cylinders.

Labeling
CNG fuel systems shall be l abeled in accordance with NFPA 52, “Compressed Natural Gas (CNG) Vehicular Fuel Systems Code,” latest revision. System expiration dates posted shall match individual cylinder dates. This shall include required labelling in driver area and inspection record labels at fueling area. Each cylinder shall have a purchased date no more than six (6) months from the date of released for shipment to the LACMTA.

Pressure Relief Devices (PRDs)
PRDs must be designed, constructed, manufactured and tested in accordance with ANIS/IAS PRD1, latest revision, “Pressure Relief Devices for Natural Gas Vehicle (NGV) Fuel Containers” and ANSI/IAS NGV2, latest revision, “Basic Requirements for Compressed N atural Gas Vehicle (NGV) Fuel Containers.” All natural gas fuel system piping, including the PRD vent line shall be stainless steel. PRDs shall be vented to the roof area of the Bus with minimum protrusion above the roof line and shall be protected with a suitable cap which shall withstand daily bus wash activity, subject to LACMTA approval during proposal period.

Valves
Valves must be installed in accordance with ANIS/IAS NGV2, latest revision, “Basic Requirements for Compressed Natural Gas Vehicle (NGV) F uel Containers” and NFPA 52, “Standard for Compressed Natural Gas (CNG) Vehicular Fuel Systems.” Manual valves shall not require the use of a tool to operate.

A quarter turn valve, easily accessible through the fuel door shall isolate the high pressure manifold and fuel storage system from the rest of the engine fuel system. The valve function and open and closed positions shall be clearly marked. An additional minimum ½ in ch valve shall be provided for draining the high pressure manifold and any fuel cylinder(s) through a service port. Type and location of the service port shall be subject to LACMTA approval during proposal period.

A primary fuel pressure regula tor shall be supplied and mounted in an accessible location for servicing.

Coolant lines shall be routed in a manner to prevent trapping air or draining coolant when the regulator is removed for service.

One flow control solenoid operated shut -off valve shall be installed for the system. A control over -ride system shall be provided to operate (open or close) the solenoid valve for defueling. The flow control solenoid valve shall remain in normally closed position until energized, and shall open when the engine is running.

All valves, including solenoid type, shall be designed to operate properly under all possible system flow rates and conditions.

One manually operated shut-off valve and one solenoid valve shall be installed on each individual fuel cylinder or each combined fuel cylinders.
52 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Gauges
Glycerin filled gauges which meets NFPA 52 requirements shall be located in the high and low pressure manifolds which shall indicate fuel system pressure. The high pressure fuel gauge shall have maximum 100 psi increments, 0 -5,000 psi, and shall be visible during f ueling operations and rated for the maximum system pressure, have welded (not soldered) fittings and have a restrictive orifice. A pressure transducer shall be incorporated into the high pressure fuel manifold which shall provide the Operators’ low fuel wa rning light which shall activate at between 300 and 650 psi.

Fuel Filter
Filters, rated for the system working pressure, shall be provided that meet the engine manufacturer’s requirements and are effective for use in LACMTA’s CNG compressor environment. Pr imary and secondary filters shall be coalescing and equipped with a drain valve or plug to periodically drain coalesced contaminants.

Fuel Filler
The fuel filler shall be located 30 to 38 feet measure behind the centerline of the front door, subject to LACMTA approval during proposal period. The filler cap shall be retained to prevent loss and shall be recessed into the body.

The fill and vent receptacles shall be located within an enclosure on the right side of the bus. The access door shall be sized to allow full viewing of gauges, ease of hookups and maneuver of fuel nozzle.

The fuel fill receptacle and vent receptacle attachment shall be robust and capable of routine fueling connects/disconnects without deflection or metal fatigue, and capable of withst anding mechanical loads induced by a fueling drive -away incident without attachment failure. Existing LACMTA fueling system break - away device requires an applied force of 150 lb.-F to cause separation.

A dual fuel filler receptacle shall be located on the right side, rear corner, of the bus, 36 to 50 inches from the street surface. The fill receptacles shall be ANSI/AGA NGV1 or NGV2 certified and shall accept an OPW CT5000 nozzle or approved equal and an OPW CT1000 nozzle or approved equal and shall incorpo rate dust caps permanently affixed to the receptacles.

A static ground connecting point shall be installed near the fueling receptacles for grounding during fueling/defueling operations.

Fueling System
The fueling port receptacle shall be an ANSI/AGA NGV1 or NGV2 certified receptacle as designated by the LACMTA. The bus shall be capable of being fueled by a LACMTA fuel system nozzle . The fueling port receptacle location shall be such that connection by fueling personnel can be performed without physical strain or interference. A dust cap shall be permanently “tethered” to the fueling port receptacle. To prevent drive - away events, the fueling system shall incorporate a proximity sensor at the fast fill fuel receptacle to detect if a fuel nozzle is connected t o it and apply an interlock. A separate sensor shall be incorporated on the fuel fill door. (Refer to Section TS 38.4) The fueling system must be sized to accommodate a minimum fuel flow of 5,000 scfm at 4,250 psi.

Defueling System
The CNG defueling port shall be an NGV -3.1/CGA-12.3 certified receptacle subject to LACMTA approval during proposal period. The CNG defueling port shall be located on the curbside of the bus, in a location that is compatible with the LACMTA’s defueling sta tion operation. The defueling system shall incorporate the following characteristics:
• Dust cap permanently “tethered” to the defueling port. • Device(s) to prevent inadvertent defueling.
• Components compatible with LACMTA’s defueling operation. 53 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 • The piping and fittings onboard the bus shall be sized to allow the fueling station to meet the following operating parameters:
• Fuel system sized to allow a bus with 20,000 scf on-board to defuel within six hours. • The atmospheric-vent system shall allow a bus with 20,000 scf of on-board CNG storage to defuel to atmospheric pressure within 80 minutes.
• Location/method of attaching CNG fuel system to earth ground.

TS 19. Emissions and Exhaust
TS 19.1 Exhaust Emissions
The engine and related systems shall meet all applicable emission and engine design guidelines and standards.

The electric vehicle propulsion system shall comply with CARB’s zero emissions standard.

TS 19.2 Exhaust System
Exhaust gases and waste heat shall be discharged from the roadside rear corner of the roof. The exhaust pipe shall be of sufficient height to prevent exhaust gases and waste heat from re-entering the bus, discoloring or causing heat deformation to the roof of the bus. The entire exhaust system shall be adequately shielded to prevent heat damage to any bus component, including the exhaust after -treatment compartment area. Heat shield shall be installed between Catalytic Converter and HVAC unit to protect the HVAC unit and wire harnesses in the area from radiant heat emanating from the Catalytic Converter after engine shut down, subject to LACMTA approval. The exhaust outlet shall be designed to minimize rain, snow or water generated from high-pressure washing systems from entering into the exhaust pipe and causing damage to the after - treatment.

Exhaust system shall inc orporate joints as necessary to facilitate removal and replacement of individual components including exhaust muffler or, if required to meet emissions requirements, catalyst units. Mounting cushions, if provided, must last the life of the engine and shall not deteriorate when exposed to high exhaust system temperatures. Exhaust piping joints shall be machined V -band clamp design. Flexible exhaust lines necessary to accommodate engine movement shall be constructed from stainless steel bellows. Exhaust piping in the engine enclosure shall include reusable metal jacket that is easy to replace.

TS 19.3 Exhaust After-treatment
An exhaust after -treatment system will be provided to ensure compliance to all applicable EPA regulations in effect.

Diesel Exhaust Fluid Injection
Not applicable.

TS 19.4 Particulate After-treatment
Not applicable.

STRUCTURE (TS 20-TS 30)
TS 20. General
TS 20.1 Design
The structure of the bus shall be designed to withstand the transit service conditions typical of an urban duty cycle throughout its service life. The vehicle structural frame shall be designed to operate with minimal maintenance throughout the 12 -year or 500,000 -mile design operating profile. The design operating profile specified by the LACMTA shall be considered for this purpose. 54 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 21. Altoona Testing
Prior to acceptance of first bus, the vehicle must have completed any FTA -required Altoona testing. Any items that required repeated repairs or replacement must undergo the corrective action with supporting test and analysis. A report clearly describing and explaining the failures and corrective actions taken to ensure any and all such failures will not occur shall be submitted to the LACMTA.

If available, the Altoona Test Report shall be provided to the LACMTA with the Proposal submittal. If not available, then the report shall be provided prior to First Article Bus acceptance.

TS 21.1 Structural Validation
Baseline Structural Analysis
The structure of the bus shall have undergone appropriate structural testing and/or analysis. At minimum, appropriate structural testing and analysis shall include Altoona testing or finite element analysis (FEA).

TS 22. Distortion
The bus, loaded to GVWR and under static conditions, shall not exhibit deflection or deformation that impairs the operation of the steering mechanism, doors, windows, passenger escape mechanisms or service doors.

Static conditions shall include the vehicle at rest with any one wheel or dual set of wheels on a six inch curb or in a six-inch deep hole.

TS 23. Resonance and Vibration
All structure, body and panel -bending mode frequencies, including vertical, lateral and torsional modes, shall be sufficiently removed from all primary excitation frequencies to minimize audible, visible or sensible resonant vibrations during normal service.

TS 23.1 Engine Compartment Bulkheads
The passeng er and engine compartment shall be separated by fire -resistant bulkheads. The engine compartment shall include areas where the engine and exhaust system are housed. This bulkhead shall preclude or retard propagation of an engine compartment fire into the p assenger compartment and shall be in accordance with the Recommended Fire Safety Practices defined in FTA Docket 90A, latest revision. Only necessary openings shall be allowed in the bulkhead, and these shall be fire -proof. Any passageways for the climate control system air shall be separated from the engine compartment by fireproof material. Piping through the bulkhead shall have copper, brass, or fireproof fittings sealed at the bulkhead with copper or steel piping on the forward side. Wiring may pass thr ough the bulkhead only if connectors or other means are provided to prevent or retard fire propagation through the bulkhead. The conduit and bulkhead connector shall be sealed with fireproof material at the fire wall. Engine access panel in the bulkhead sh all be fabricated of fireproof material and hinged to the bulkhead with fireproof fasteners. These panels, their fasteners and the bulkhead shall be constructed and reinforced to minimize warping of the panels during a fire that will compromise the integri ty of the bulkhead. Access panels shall be constructed to prevent vapors and fumes from entering the passenger compartment.

TS 23.2 Crashworthiness (Transit Bus)
Contractor shall be required to provide FEA software analysis or other evidence of compliance with this section during the pre-award audit. The bus body and roof structure shall withstand a static load equal to 150 percent of the curb weight evenly distributed on the roof with no more than a six inches reduction in any interior dimension. Windows shall remain in place and shall not open under such a load. These requirements must be met without the roof-mounted equipment installed.

The bus shall withstand a 25 mph impact by a 4,000-pound automobile at any side, excluding doorways, along either side of the bus with no more than three inches of permanent structural deformation at seated passenger hip height. This impact shall not result in sharp edges or protrusions in the bus interior. 55 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Exterior panels below 35 inches from ground level shall withstand a static load of 2 ,000 pounds applied perpendicular to the bus by a pad no larger than five sq. inches. This load shall not result in deformation that prevents installation of new exterior panels to restore the original appearance of the bus.

The bus, at GVWR and under static conditions, shall not exhibit deformation or deflection that impairs operation of doors, windows, or other mechanical elements. Static conditions include the bus at rest with any one wheel or dual set of wheels on a 6-inch curb or in a six-inch deep hole.

All structure, body, and panel -bending mode frequencies, including vertical, lateral, and torsional modes, shall be sufficiently removed from all primary excitation frequencies to minimize audible, visible, or sensible resonant vibrations during normal service.

TS 24. Corrosion
The bus flooring, sides, roof, understructure and axle suspension components shall be designed to resist corrosion or deterioration from atmospheric conditions and de -icing materials for a period of 12 years or 500,000 miles, whichever comes first. It shall maintain structural integrity and nearly maintain original appearance throughout its service life, with the LACMTA’s use of proper cleaning and neutralizing agents.

All materials that are not inherently corrosion resistant s hall be protected with corrosion -resistant coatings. All joints and connections of dissimilar metals shall be corrosion resistant and shall be protected from galvanic corrosion. All body joints and seams shall be protected by application of polyurethane ba sed sealer, or approved equal, at assembly. Representative samples of all materials and connections shall withstand a two - week (336 -hour) salt spray test in accordance with ASTM Procedure B -117 with no structural detrimental effects to normally visible surfaces and no weight loss of over one percent.

The entire bus understructure, including wheel housings, shall be spray -coated prior to installation of sub - assemblies with suitable corrosion preventative undercoating which meets the bus manufacturer’s corros ion protection specifications. The Contractor shall provide a copy of its proposed undercoating system program at the first Pre-Production meeting.

Corrosion Resistance Requirements for Exposed and Interior Surfaces of Tubing throughout Entire Vehicle
All exposed surfaces and the interior surfaces of tubing and other enclosed members shall be corrosion resistant through incorporation of intrinsically corrosion -resistant materials or through the application of a corrosion protection system.

Additional Corrosion Resistance Requirements
Alternatively the vehicle may be constructed using only inherently corrosion -resistant materials and fasteners such as stainless steel or composites to minimize deterioration TS 25. Towing
Towing attachment points shall be provided on the front of the bus. Each towing device, when used with a load equalizing sling, shall withstand, without permanent deformation, tension loads up to 1.2 times the curb weight of the bus within 20 degrees of the longitudinal axis of the bus. If applicable, the rear towing device(s) shall not provide a toehold for unauthorized riders. The method of attaching the LACMTA’s towing bar shall require the specific approval of the LACMTA in Pre-Production meetings and s hall not require the removal, or disconnection, of front suspension or steering components. Removal of the bike rack is permitted for attachment of towing devices. Contractor shall provide 15 sets of any special towing equipment adapters, if required, so that the LACMTA is able to flat tow the bus. Contractor shall demonstrate compliance with these provisions using the Pilot Bus.
56 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Provision of Connectors for Towing
Shop air connectors shall be provided at the front and rear of the bus and shall be capable of supplying all pneumatic systems of the bus with externally sourced compressed air. The location of these shop air connectors shall facilitate towing operations. A second air supply should be provided to allow the rear service brakes to be applied using the tow truck brake signal air pressure to apply the rear primary service brakes.

All male fittings shall have an additional quarter turn manual shut off valve provided near the front bumper for use only during towing, subject to LACMTA approval in Pre-Production meetings. Fittings shall be protected against dirt and moisture when not in use. Air connectors shall be LACMTA standard air chucks conveniently located in the engine compartment. Air lines leading to the external air shall include hand shut-off valves.

Lifted (Unsupported) Front Axle and Flat Towing Capability The front towing attachment points shall allow attachment of the LACMTA’s standard tow bar. The front towing attachment points shall permit towing of the bus at curb weight by the towing de vice(s) and the LACMTA tow bar without damage to anybody panel or component. These devices shall permit common flat towing.

Two rear recovery devices/tie downs shall permit lifting and towing of the bus for a short distance, such as in cases of an emergency, to allow access to provisions for front towing of bus. The method of attaching the tow bar or adapter shall require the specific approval of the LACMTA in pre -production meetings. Any tow bar or adapter exceeding 50 pounds should have means to maneuver or allow for ease of use and application. Each towing device shall accommodate a crane hook with a one-inch throat.

TS 26. Jacking
It shall be possible to safely jack up the bus, at curb weight, with a common 10 -ton floor jack with or without special adapter, wh en a tire or dual set is completely flat and the bus is on a level, hard surface, without crawling under any portion of the bus. Jacking from a single point shall permit raising the bus sufficiently high to remove and reinstall a wheel and tire assembly. J acking pads located on the axle or suspension near the wheels shall permit easy and safe jacking with scissors or bottle jack with the flat tire or dual set on a six inches high run-up block not wider than a single tire. The bus shall withstand such jackin g at any one or any combination of wheel locations without permanent deformation or damage.

Jacking and changing any one tire/wheel assembly shall be completed by one LACMTA mechanic. The bus shall withstand such jacking at any one or any combination of wh eel locations without permanent deformation or damage.

Yellow Pads
Jacking pads shall be painted safety yellow.

Decals
Apply decals to identify location of jacking pads. The location of the jacking pad shall be identified with a label on the exterior of the bus, directly over the jack pad.

TS 27. Hoisting
The bus axles or jacking plates shall accommodate the lifting pads of a two -post hoist system. Jacking plates, if used as hoisting pads, shall be 5-1/4 square inches, with a turned-down flange not less than ½-inch deep on each side (if applicable) to prevent the bus from falling off the hoist. A model or sample jacking plate shall be provided during Pre-Production meetings for approval by LACMTA. Other pads or the bus structure shall support the bus on jack stand s independent of the hoist. The manufacturer may be required to demonstrate compatibility with LACMTA hoists as part of the towing demonstration for TS 25. 57 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 28. Floor
TS 28.1 Design (Transit Bus)
The floor shall be essentially a continuous plane, except at the wheel h ousings and platforms. Where the floor meets the walls of the bus, as well as other vertical surfaces such as platform risers, the surface edges shall be blended with a circular section of radius not less than 3/8 in ch or installed in a fully sealed butt j oint.

Similarly, a molding or cover shall prevent debris accumulation between the floor and wheel housings. The vehicle floor in the area of the entrance and exit doors shall have a lateral slope not exceeding two degrees to allow for drainage.

Floor installation, repair, and replacement method shall be subject to LACMTA approval during proposal period.

Bi-level Floor Design
The floor design shall consist of two levels (bi -level construction). Aft of the rear door extending to the rear settee riser, the floor height may be raised to a height no more than 21 inches above the lower level, with equally spaced steps. An increase slope shall be allowed on the upper level, not to exceed 3.5 degrees off the horizontal.

TS 28.2 Design (Commuter Bus)
Not applicable.

TS 28.3 Design (Articulated Transit Bus)
Not applicable.

TS 28.4 Strength
The floor deck may be integral with the basic structure or mounted on th e structure securely to prevent chafing or horizontal movement and designed to last the life of the bus. Sheet metal screws shall not be used to retain the floor, and all floor fasteners shall be serviceable from one side only. Any adhesives, bolts or screws used to secure the floor to the structure shall last and remain effective throughout the life of the bus. Tapping plates, if used for the floor fasteners, shall be no less than the same thickness as a standard nut, and all floor fasteners shall be secured and protected from corrosion for the service life of the bus.

The floor deck shall be reinforced as needed to support passenger loads. At GVWR, the floor shall have an elastic deflection of no more than 0.60 in ch from the normal plane. The floor shall w ithstand the application of

2.5 times gross load weight without permanent detrimental deformation. The floor, with coverings applied, shall withstand a static load of at least 150 pounds applied through the flat end of a ½ -inch diameter rod, with 1/32- inch radius, without permanent visible deformation.

TS 28.5 Construction
The floor shall consist of the subfloor and the floor covering that will last the life of the bus. The floor as assembled, including the sealer, attachments and cove ring shall be waterproof, non-hygroscopic and resistant to mold growth. The subfloor shall be resistant to the effects of moisture, including decay (dry rot). It shall be impervious to wood-destroying insects such as termites.

The floor shall be constructe d using composite flooring material approved by the LACMTA during proposal period. All floor surfaces, including edges shall be water proofed, non-hygroscopic, resistant to wet and dry rot, mold growth, and impervious to insects. Floor panels shall be attached to the substructure in such a manner as to be water tight and free from squeaks. Fasteners shall be rust proof.

TS 28.6 Construction (Commuter Bus)
Not applicable.
58 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 29. Platforms
TS 29.1 Driver’s Area
The covering of platform surfaces and risers, except where otherwise in dicated, shall be the same material as specified for floor covering Non-corroding metal trim shall be provided and installed with stainless steel hardware along top edges of platforms unless integral nosing is provided.

TS 29.2 Driver’s Platform
The driver’s platform shall be of a height such that, in a seated position, the driver can see an object located at an elevation of 42 inches above the road surface, 24 inches from the leading edge of the bumper.

Notwithstanding this requirement, the platform height shall not position the driver such that the driver’s vertical upward view is less than 15 degrees. A warning decal or sign shall be provided to alert the driver to the change in floor level. Figure 3 illustrates a means by which the platform height can be determined, using the critical line of sight.

FIGURE 3
Determining Platform Height

TS 29.3 Farebox
Farebox placement should minimize impact to passenger access and minimize interference with the driver’s line of sight.

Driver Interface Required; Platform Needed to Bring Height to Driver Access If the driver’s platform is higher than 12 inches, then the farebox is to be mounted on a platform of suitable height to provide accessibility for the driver without compromising passengers’ access. A maxim um of two steps shall be allowed for access to the Operator’s seat pedestal. Farebox stanchion shall be placed to also provide assistance to Operator when entering/exiting driver’s seat. 59 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Stanchions
Stanchions shall be located around the farebox in accordance with ADA requirements. and subject to LACMTA approval during proposal period.

TS 29.4 Rear Step Area to Rear Area (Transit Bus)
If the vehicle is of a bi -level floor design, then a rear step area shall be provided along the center aisle of the bus to facilitate passenger traffic between the upper and lower floor levels. This step area shall be cut into the rear platform and shall be approximately the aisle width, a minimum 12 inches deep and approximately half the height of the upper level relative to the lower level. The horizontal surface of this platform shall be covered with skid-resistant material with a visually contrasting no sing and shall be sloped slightly for drainage. A warning decal or sign shall be provided at the immediate platform area to alert passengers to the change in floor level.

If there is an interior raised floor area, a maximum of two steps shall be allowed fo r access to the raised floor area behind the rear door. All step riser heights shall be the same. Risers shall be continuous, flat planes across the entire width. Step risers may be inclined, not to exceed 10 degrees from the vertical (nosing edge lower). All corners shall have radii no less than ¼-inch to facilitate cleaning.

Each step shall simultaneously support a 300 -pound load evenly distributed over the center half of each step - tread without permanent deformation and with elastic deflection of no more than 1/8-inch. Each step tread shall support a load of 500 pounds evenly distributed over the center half of the tread without permanent deformation. The steps shall be sloped only sufficient to preclude water accumulation.

TS 30. Wheel Housing
TS 30.1 Design and Construction
Sufficient clearance and air circulation shall be provided around the tires, wheels and brakes to preclude overheating when the bus is operating on the design operating profile. Wheel housings shall be constructed of corrosion-resistant and fire-resistant material. Sufficient clearance and air circulation shall be provided around the tires, wheels and brakes to prevent overheating when the bus is operated in revenue service.

Wheel housings, as installed and trimmed, shall withstand impacts of a two- inch steel ball with at least 200 foot-pounds of energy without penetration.

TS 30.2 Design and Construction (Transit Bus)
Interference between the tires and any portion of the bus shall n ot be possible in maneuvers up to the limit of tire adhesion with weights from curb weight to GVWR. Wheel housings shall be adequately reinforced where seat pedestals are installed. Wheel housings shall have sufficient sound insulation to minimize tire and road noise and meet all noise requirements of this specification.

Design and construction of front wheel housings shall allow for the installation of a radio or electronic equipment storage compartment on the interior top surface.

The finish of the front wheel housings shall be scratch-resistant and complement interior finishes of the bus to minimize the visual impact of the wheel housing. If fiberglass , or other composite material, wheel housings are provided, then they shall be color -impregnated to match interior finishes. The lower portion extending to approximately 10 to 12 inches above the floor shall be equipped with stainless steel trim.

Wheel housings not equipped with seats or equipment enclosure shall have a horizontal assist mounted on the top portion of the housing no more than seven inches higher than the wheel well housing. If required for access to suspension components, installation of access panels in the wheel housing must meet all requirements listed including fastening devices, strength and mounting. 60 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 30.3 Articulated Joint (Articulated Transit Bus)
Not applicable.

TS 30.4 Raceway (Articulated Transit Bus)
Not applicable.

TS 30.5 Bellows
Not applicable.

CHASSIS (TS 31-TS 38)
TS 31. Suspension
TS 31.1 General Requirements
The front and rear suspensions shall be pneumatic type. The basic suspension system shall last the service life of the bus without major overhaul or replacement. Adjustment points shall be minimized and shall not be subject to a loss of adjustment in service. Routine adjustments shall be easily accomplished by limiting the removal or disconnecting the components. Heavy-duty height control valves shall be provided to keep the bus body in relatively level position and shall contain a dampening or compensating feature to prevent excessive consumption of air resulting from high-frequency axle movements over rough streets. The height control valves will retain the height of the body in relation to the axles under all loading conditions. Regardless of load, the bus relative height to the centerline of the wheels shall not change more than ± 0.5 inches TS 31.2 Alignment
All axles should be properly aligned so the vehicle tracks accurately within the size and geometry of the vehicle.

TS 31.3 Springs and Shock Absorbers
TS 31.3.1 Suspension Travel
The suspension system shall permit a minimum wheel travel of three inches jounce-upward travel of a wheel when the bus hits a bump (higher than street surface), and three inches rebound-downward travel when the bus comes off a bump and the wheels fall relative to the body. Elastomeric bumpers shall be provided at the limit of jounce travel. Rebound travel may be limited by elastomeric bumpers or hydraulically within the shock absorbers. Suspensions shall incorporate appropriate devices for automatic height control so that regardless of load the bus height relative to the centerline of the wheels does not change more than ½ inch at any point from the height required. The safe operation of a bus cannot be impacted by ride height up to one inch from design normal ride height.

TS 31.3.2 Damping
Vertical damping of the suspension system shall be accomplished by hydraulic shock absorbers mounted to the suspension arms or axles and attached to an appropriate location on the chassis. Damping shall be sufficient to control bus motion to three cycles or less after hitting road perturbations. The shock absorber bushing shall be made of elastomeric material that will last the life of the shock absorber. The damper shall incorporate a secondary hydraulic rebound stop. Shock absorber travel shall be centered on suspension travel to equalize travel to stops in jounce and rebound.

TS 31.3.3 Lubrication
Standard Grease Fittings
Components that do not require regular greasing are desired. A review of all components available that do not require greasing shall be provided with proposal. All elements of steering, suspension and drive systems 61 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 requiring scheduled lubrication shall be provided with grease fittings conforming to SAE Standard J534. These fittings shall be located for ease of inspection and shall be accessible with a standard gr ease gun from a pit or with the bus on a hoist. Each element, requiring lubrication, shall have its own grease fitting with a relief path.

The lubricant specified shall be standard for all elements on the bus serviced by standard fittings and shall be required no less than every 6,000 miles.

TS 31.3.4 Kneeling/Raising
Kneeling
A kneeling system shall lower the entrance of the bus a minimum of 2.75 inches during loading or unloading operations regardless of load up to GVWR, measured at the longitudinal centerline of t he entrance door by the driver. The kneeling control shall provide the following functions:
• Downward control must be held to allow downward kneeling movement. • Release of the control during downward movement must completely stop the lowering motion and hold the height of the bus at that position.
• Upward control actuation must allow the bus to return to normal floor height without the driver having to hold the control.

The brake and throttle interlock shall prevent movement when the bus is kneeled. The kneeling control shall be disabled when the bus is in motion. The bus shall kneel at a maximum rate of 1.25 inches per second at essentially a constant rate reaching fully kneeled position within 4.5 seconds. After kneeling, the bus shall rise within 3 seconds to a height permitting the bus to resume service and shall rise to the correct operating height within 7 seconds regardless of load up to GVWR. During the lowering an d raising operation, the maximum vertical acceleration shall not exceed 0.2g, and the jerk shall not exceed 0.3g/second.

An indicator visible to the Operator shall be illuminated until the bus is raised to a height adequate for safe street travel. An audib le warning alarm will sound simultaneously with the operation of the kneeler to alert boarding passengers and minimize the sound directed to other areas . The audible alarm sound level shall be automatically adjustable to compensate for ambient sound levels. A warning light mounted near the curbside of the front door, a minimum 2.5 inches diameter amber lens, shall be provided that will blink when the kneel feature is activated. Kneeling shall not be operational while the wheelchair ramp is deployed or in operation.

Raising
The bus shall incorporate a system controlled by the Operator that permits the bus to raise (to account for high curbs) 2.75 inches, measured from normal ride height at the center of the bottom front step regardless of passenger load up to GVWR. Brake and throttle interlock shall be activated to prevent movement when the Bus is raised. The bus shall rise at a maximum rate of 1.25 inches per second at essentially a constant rate reaching fully raised position within 4.5 seconds. After rising the bus shall recover (lower) within 3.5 seconds to a ride height permitting the bus to resume service and shall fully recover to the correct operating ride height within 10 seconds. During the lowering operation, the maximum acceleration shall not exceed 0.2g and the jerk shall not exceed 0.3g/sec. measured on the front door step tread.

An indicator visible to the Operator shall be illuminated until the bus has recovered to a height adequate for safe operation. The indicator lights shall be clearly labeled. Warning devices that operate with the high curb system which are visible and audible to passengers near the curbside of the front door shall be provided.

TS 32. Wheels and Tires
TS 32.1 Wheels
All wheels shall be interchangeable and shall be removable without a puller. Wheels shall be compatible with tires in size and load -carrying capacity. Front wheels and tires shall be balanced and counter weighted as an assembly per SAE J1986. Wheel stud nut(s) shall be 1.50 -inch in size, (or metric equivalent), and shall be finished with rust preventative in natural steel with no paint. 62 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Wheels and tires shall be removable without disturbing the fender skirts.

Aluminum Wheel
Wheels shall be Alcoa Durabrite polished aluminum. Wheels must be sized to accommodate disc brakes at all wheel locations.

TS 32.2 Tires
Tires shall be suitable for the conditions of transit service and sustained operation at the maximum speed capability of the bus. Load on any tire at GVWR shall not exceed the tire Supplier’s rating.

The tires shall be provided under a lease agreement between LACMTA and the tire Supplier. Tires are to be furnished to the Contractor by the LACMTA or authorized representative. Contractor shall provide the LACMTA with a record listing tires installed for each bus delivered. The information shall include the LACMTA brand serial number and mounting location on the bus. Contractor shall conform to tire manufacturer specifications for maximum road speed and duty cycle during bus delivery.

TS 33. Steering
Electrically driven hydraulic assisted or electrically assisted steering shall be provided. The steering gear shall be an integral type with the number and length of flexible lines minimized or eliminated. Steering torque applied by the Operator shall not exceed 10 foot -pounds with the front wheels straight ahead. Steering torque may increase to 70 foot -pounds when the wheels are approaching the steering stops. Steering effort shall be measured with the Bus at Seated Load Weight (SLW), sto pped with the brakes released and the engine at normal idling speed on clean, dry, level, commercial asphalt pavement with the tires inflated to recommended pressure. Power steering failure shall not result in loss of steering control. While the bus is in operation, the steering effort shall not exceed 55 pounds at the steering wheel rim and perceived free play in the steering system shall not materially increase as a result of power assist failure. Gearing shall require no more than seven turns of the steering wheel lock-to-lock.

TS 33.1 Steering Axle (Transit Bus)
Solid Beam Axle and Grease-Type Front Bearings and Seals The front axle shall be solid beam, non -driving with a load rating sufficient for the bus loaded to GVWR and shall be equipped with preferred unitized grease type front wheel bearings and seals.

All friction points on the front axle shall be equipped with replaceable bushings or inserts and, if needed, lubrication fittings easily accessible from a pit or hoist.

The steering geometry of the outside wheel shall be within two degrees of true Ackerman up to 50 percent lock measured at the inside wheel. The steering geometry shall be within three degrees of true Ackerman for the remaining 100 percent lock measured at the inside wheel.

TS 33.2 Steering and Tag Axles (Commuter Bus)
Not applicable.

TS 33.3 Steering Wheel
TS 33.3.1 Turning Effort
Steering effort shall be measured with the bus at GVWR, stopped with the brakes released and the engine at normal idling speed on clean, dry, level, commercial asphalt pavement and the tires i nflated to recommended pressure.
63 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Under these conditions, the torque required to turn the steering wheel 10 deg rees shall be no less than 5 foot- pounds and no more than 10 f oot-pounds. Steering torque may increase to 70 foot.-pounds when the wheels are approaching the steering stops, as the relief valve activates.

Power steering failure shall not result in loss of steering control. With the bus in operation, the steering effort shall not exceed 55 pounds at the steering wheel rim, an d perceived free play in the steering system shall not materially increase as a result of power assist failure. Gearing shall require no more than seven turns of the steering wheel lock-to-lock.

Caster angle shall be selected to provide a tendency for the return of the front wheels to the straight position with minimal assistance from the driver.

TS 33.3.2 Steering Wheel, General
The steering wheel diameter shall be approximately 18 to 20 inches; the rim diameter shall be ⅞ to 1¼ inches and shaped for firm grip with comfort for long periods of time.

Steering wheel spokes and wheel thickness shall ensure visibility of the dashboard so that vital instrumentation is clearly visible at center neutral position (within the range of a 95th -percentile male, as described in SAE 1050a, Sections 4.2.2 and 4.2.3). Placement of steering column must be as far forward as possible, but either in-line with or behind the instrument cluster.

Foam-covered steering wheel is not acceptable. The steering wheel shall be removable with a sta ndard or universal puller.

TS 33.3.3 Steering Column Tilt
The steering column shall have full tilt capability with an adjustment range of no less than 35 degrees and easily adjustable by the driver.

Steering column shall be a tilt and telescopic model. Column shall be easily adjustable while driver is seated in the driver’s seat. The mechanism for adjustments shall be designed for ease of use, durability, utilize detents to position and lock the steering column and not require tightening by hand to apply a clamping force.

TS 33.3.4 Steering Wheel Telescopic Adjustment
The steering wheel shall have full telescoping capability and have a m inimum telescopic range of two inches (but no more than 5 inches) and a minimum low -end adjustment of 32 inches, measured from the top of the steering wheel rim in the horizontal position, (0 degrees slope), to the cab floor at the heel point.

TABLE 6
Steering Wheel Height1 Relative to Angle of Slope
At Minimum Telescopic Height Adjustment (+0 in.) At Maximum Telescopic Height Adjustment (+5 in.) Angle of Slope Height Angle of Slope Height
0 degrees 32 inches 0 degrees 34 inches
15 degrees 26.2 inches 15 degrees 31.2 inches
25 degrees 24.6 inches 25 degrees 29.6 inches
35 degrees 22.5 inches 35 degrees 27.5 inches

1. Measured from bottom portion closest to driver.

TS 34. Drive Axle
The bus shall be driven by a heavy -duty axle with a load rating sufficient for the bus loaded to GVWR. The drive axle shall have a design life to operate for not less than 300,000 miles on the design operating profile without replacement or major repairs. The lubricant drain plug shall be magnetic type. If a planetary gear 64 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 design is employed, the oil level in the planetary gears shall be easily checked through the plug or sight gauge.

The axle and driveshaft components shall be rated for both propulsion and retardation modes with respect to duty cycle.

NOTE: The retardation duty cycle can be more aggressive than propulsion.

The drive shaft shall be guarded to prevent hitting any critical systems, including brake lines, bus floor or the ground, in the event of a tube or universal joint failure.

End tubes shall be threaded to allow for adjustment of wheel bearing nuts.

Wheel bearings shall be sealed, unitized construction.

Rear axle shall use full synthetic oil meeting axle manufacturer’s specifications.

NOTE: Trip recorder to be used in place of hub odometer. (Refer to Section TS 43.1.3) TS 34.1 Non-Drive Axle
The non-drive axle is the drive axle without the drive gear with a load rating sufficient for the load to GVWR.

TS 35. Tag Axles (Commuter Coach)
Not applicable.

TS 36. Turning Radius
Outside body corner turning radius shall not exceed the maximum at SLW. The front tires shall not rub or interfere in any manner with the bus body parts when turned in either direction under all operating conditions.

The turning radius shall be consistent from bus to bus and left to right with no more than six inch difference in measured radius.

TABLE 7
Maximum Turning Radius
Bus Length
(approximate)
Maximum Turning Radius
(see Figure 4)
40 ft. 44 ft. (TR0)
FIGURE 4
Turning Radius
65 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19

TS 37. Brakes
TS 37.1 Service Brake
The entire service brake system, including ABS controls, friction material, shall meet applicable FMVSS standards. The entire brake system, including friction material, shall have overhaul or replacement life goal of at least 45,000 miles when operated under LACMTA service.

Brakes shall be self-adjusting. Mechanical Brake Wear indicators, (visible brake sensors), shall utilize stainless steel exposed push rods.

TS 37.2 Actuation
Air-Actuated Brakes
Service brakes shall be controlled and actuated by a compressed air system. Force to activate the brake pedal control shall be an essentially linear function of the bus deceleration rate and shall not exceed 70 pounds at a point seven inches above the heel point of the pedal to achieve maximum braking. The heel point is the location of the driver’s heel when his or her foot is rested flat on the pedal and the heel is touching the floor or heel pad of the pedal. The ECU for the ABS system shal l be protected, yet in an accessible location to allow for ease of service.

The total braking effort shall be distributed between all wheels in such a ratio as to ensure equal friction material wear rate at all wheel locations. Manufacturer shall demonstra te compliance by providing a copy of a thermodynamic brake balance test upon request.

TS 37.3 Friction Material
The brake linings shall be made of non -asbestos material. In order to aid maintenance personnel in determining extent of wear, a provision such as a scr ibe line or chamfer indicating the thickness at which replacement becomes necessary shall be provided on each brake lining. No bolts or rivets shall be used to retain the brake lining.

TS 37.4 Hubs and Drums/Discs
Replaceable unitized wheel bearing seals shall run on replaceable wear surfaces. Wheel bearings and hub seals and unitized hub assemblies shall not leak or weep lubricant when operating on the design operating profile for the duration of the initial manufacturer’s warranty or 100,000 miles, whichever is longer.

66 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Axle hubs shall be HUB pilot wheel mounting. Hubs shall be painted semi -gloss (50 percent) black with no paint on mating surfaces.

Disc Brakes on All Axles
The bus shall be equipped with disc brakes on all axles, and the brake discs shall allow machining of each side of the disc to obtain smooth surfaces per manufacturer’s specifications.

The brake system material and design shall be selected to absorb and dissipate heat quickly so that the heat generated during braking operation does not glaze brake linings.

TS 37.5 Hubs and Drums (Commuter Bus)
Not applicable
TS 37.6 Parking/Emergency Brake
Air Brakes
The parking brake shall be a spring -operated system, actuated by a valve that exhausts compressed air to apply the brakes. The parking brake may be manually enabled when the air pressure is at the operating level per FMVSS 121.

The parking brake shall be actuated by a valve mounted convenient to the Operator, subject to LACMTA approval in Pre-Production meetings. In the event of total loss of air pressure, spring brak es shall be applied automatically.

An audible warning alarm shall be activated when the Master Run switch is in “ Off” position or transmission is in neutral and parking brake is not actuated.

Emergency Brake
An emergency brake release shall be provided to release the brakes in the event of automatic emergency brake application. The driver shall be able to manually depress and hold down the emergency brake release valve to release the brakes and maneuver the bus to safety. Once the driver releases the emerge ncy brake release valve, the brakes shall engage to hold the bus in place.

Parking and Emergency brake controls shall be equipped with powder coated metal knobs (no plastic knobs).

Colored “yellow” for Parking, and “green” for Emergency release functions.

TS 38. Interlocks (Transit Bus)
TS 38.1 Passenger Door Interlocks
To prevent opening mid and rear passenger doors while the bus is in motion, a speed sensor shall be integrated with the door controls to prevent the mid/rear doors from being enabled or opened unless the bus speed is less than 3 mph.

To preclude movement of the bus, an accelerator interlock shall lock the accelerator in the closed position, and a brake interlock shall engage the service brake system to stop movement of the bus when the driver’s door control is moved to a mid/rear door enable or open position, or a mid or rear door panel is opened more than three inches from the fully closed position (as measured at the leading edge of the door panel). This interlock shall also be applied when the emergency release system for the doors is activated.

The interlock engagement shall bring the bus to a smooth stop and shall be capable of holding a fully loaded bus on a six percent grade, with the engine at idle and the transmission in gear, until the interlocks are released. These interlock functions shall be active whenever the vehicle master run switch is in any run position.
67 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 All door systems employing brake and accelerator interlocks shall be supplied with supporting failure mode effects analysis (FEMA) documentation, which demonstrates th at failure modes are of a failsafe type, thereby never allowing the possibility of release of interlock while an interlocked door is in an unsecured condition, unless the Master Door Interlock switch has been actuated to intentionally release the interlock s. Built in redundancy shall prevent the system from becoming unsafe while a single point failure exists anywhere in the system.

Brake interlock regulator shall be non-adjustable.

Once activated the brake interlock shall not release until the operator makes a 6 psi service brake application.

Accelerator and brake interlock shall not be applied when front door is opened.

TS 38.2 Lift Interlocks
When front ramp/kneel enable switch is activated an accelerator interlock shall disable the accelerator and a brake interlock shall engage the service brake system to stop movement of the bus. Interlocks shall not be released until ramp is fully stowed and the operator makes a 6 psi service brake application.

TS 38.3 Kneel Interlocks
When front ramp/kneel enable switch is activated an accelerator interlock shall disable the accelerator and a brake interlock shall engage the service brake system to stop movement of the bus. Interlocks shall not be released until bus returns to normal operating height and the Operator makes a 6 psi service brake application.

TS 38.4 Fuel/Charging System Interlocks
CNG
The bus shall be designed to remove ignition power from the engine, prevent the transmission from going into gear and disable the engine starter when the sensor detects a fuel nozzle connected to the fast fill receptacle.

The interlock shall be of the type such that if the sensor fails, the bus will not start. The system shall provide a separate interlock preventing starting of the engine when fuel fill door is in open position. Both sensing systems shall be a high -reliability design with minimum 95 percent availability for correct operation and function. This interlock shall also be of the type such that if the sensor fails, the bus will not start.

The fuel nozzle proximity sensor prohibits the engagement of the starting circuit and engages the “Fueling in Progress” indication on the dash monitor.

Zero Emission
The bus shall be designed to remove ignition power from the PPU and prevent the drive system from engaging when the sensor detects a charger connected to the charge port. The interlock shall be of the type such that if the sensor fails, the bus will not run. The sensing systems shall be a high -reliability design with minimum 95 percent availability for correct operation and function. This i nterlock shall also be of the type such that if the sensor fails, the bus will not run.

PNEUMATIC SYSTEM (TS39)
TS 39. Pneumatic System
TS 39.1 General
The bus air system shall operate the air -powered accessories and the braking system with reserve capacity.

The bus air system shall meet requirements of California Code 13 CCR 1245 for air leakage and shall not leak as defined by the following tests:
68 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 a) The air pressure in new buses shall not decrease by more than 10 psi over the first 10-minute period of time immediately following initial air build up, as indicated on the brake reservoir dash gauges, (as per TP-FMVSS121).
b) With the air system fully charged, cooled off and stabilized for 10 minutes, the brake interlock applied, and no other accessories in use (i.e., opening/clo sing the doors, air actuated wipers), a new bus shall not leak more than 1 psi over the following 15 minutes as indicated on the brake reservoir dash gauges.

Provision shall be made to apply shop air to the bus air systems. A quarter turn manual shut -off valve with quick disconnect fitting shall be easily accessible and located in the engine compartment and shall supply air prior to the air dryer, subject to LACMTA approval in Pre-Production meetings.

Air for the compressor shall be filtered. The air system shall be protected per FMVSS 121 (S5.1.2.3).

Air System Design Operating Profile
The bus air system shall operate the air-powered accessories and the braking system with reserve capacity, as defined by using the following test(s):

With bus loaded to GVWR and operating under normal conditions, the air system and its major components (air compressors, air dryers) shall be designed to operate under the Manhattan Operating Profile as defined per SAE J2711 or an equivalent, without exceeding the technical spec ifications of the major components .

Operating under normal conditions implies –
• All air actuated accessories on.
• Retarders/regenerative brakes in use.
• Ambient temperatures between 32°F and 100°.F;
• One kneel operation on every 4th bus stop as defined per SAE J2711. • Interlock shall be set at each stop.

TABLE 8
Air System Test Profiles
Operating profile (Extract from SAE J2711)
Speed [mph] Stops
[#]
Distance
[miles]
Stops
[#/miles] Top Average
UDDS (high speed bus operation) 58.00 19 28.00 11.10 2.53 Orange County (intermediate speed bus
operation) 40.63 12.7 31.00 6.54 4.75
Manhattan (low speed bus operation) 25.30 6.8 40.00 4.13 9.69 Kneeling operation shall be achieved as per TS 31.3.4 and implies:
• Bus brought to a complete stop;
• Open all doors (implies activation of brake interlock(s)) • Kneel to meet TS 31.3.4 requirements;
• Wait 10 seconds;
• Close all doors;
• Apply service brakes to release brake interlock(s);
• Raise the bus to safe operation of suspension systems TS 39.2 Air Compressor
The electrically-driven air compressor shall be sized (designed) to charge the entire air system on new buses from 0 psi to 120 psi in less than five minutes for a single unit bus not exceeding the fast idle speed (~1000 rpm) setting of the engine.
69 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 Charge time procedure and conditions: with air spring inflated and the bus at curb weight, all air tanks except emergency tank(s) fully drained, brake interlock, service brakes and air system accessories (i.e., doors, wipers, kneeling device or leveling), must not be activated or engaged during charge up procedure.

The electrically-driven air compressor shall be designed to supply air operating under the Air System Design Operating Profile while remaining within the manufactures air compressor specifica tions. The discharge temperature (measured at the compressor outlet using a probe thermocouple) shall not exceed 360º F, (410º F for oil-less compressors) excluding temperature spikes of durations less than two seconds and two percent of compressor charge time. Air compressor duty -cycle shall not exceed the compressor manufacturers rating in any 10-minute period under the Manhattan Operating Profile.

Air Compressor Governor
Air governor shall be adjustable with a cap and a red stripe from the cap to the gov ernor body using tamper resistant paint and be mounted in a suitable location which will be easily accessible for maintenance.

TS 39.3 Air Lines and Fittings
Air lines, except necessary flexible lines, shall conform to the installation and material requirements of SAE Standard J1149 for copper tubing with standard, brass, flared or ball sleeve fittings, or SAE Standard J844 for nylon tubing if not subject to temperatures over 200 º F. The air on the delivery side of the compressor where it enters nylon housing shall not be above the maximum limits as stated in SAE J844. Nylon tubing shall be installed in accordance with the following color-coding standards:
• Green: Indicates primary brakes and supply.
• Red: Indicates secondary brakes.
• Brown: Indicates parking brake.
• Yellow: Indicates compressor governor signal.
• Black: Indicates accessories.

Line supports shall prevent movement, flexing, tension, strain and vibration. Copper lines shall be supported to prevent the lines from touching one another or any component of the bus. To the extent practicable and before installation, the lines shall be pre -bent on a fixture that prevents tube flattening or excessive local stra in.

Copper lines shall be bent only once at any point, including pre -bending and installation. Bends shall be provided with large radius, (sweeps), to minimize restrictions to lines. Rigid lines shall be supported at no more than 5-ft. intervals. Nylon lines may be grouped and shall be supported at 30 -inch intervals or less. Nylon lines shall incorporate press-to-connect type fittings allowing rapid replacement of lines.

The compressor discharge line between PPA/PPU and body-mounted equipment shall be flexible Teflon hose with a braided stainless steel jacket. Other lines necessary to maintain system reliability shall be flexible Teflon hose with a braided stainless steel jacket. End fittings shall be standard SAE or JIC brass or steel, flared, swivel-type fittings. Flexible hoses shall be as short as practicable and individually supported. They shall not touch one another or any part of the bus except for the supporting grommets. Flexible lines shall be supported at 2-ft. intervals or less.

Air lines shall be clean before installation and shall be installed to minimize air leaks. All air lines shall be routed to prevent water traps to the extent possible. Grommets or insulated clamps shall protect the air lines at all points where they pass through understructure components.

TS 39.4 Air Reservoirs
All air reservoirs shall meet the requirements of FMVSS Standard 121 and SAE Standard J10 and shall be equipped with guarded or flush type drain valves below floor level . Major structural members shall protect these valves and any automatic moisture ejector valves from road hazards. Reservoirs shall be sloped toward the drain valve. All air reservoirs shall have drain valves mounted below floor level with lines routed to eliminate the possibility of water traps. All air tanks shall have check valves at the inlet side for isolation. 70 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 TS 39.5 Air System Dryer
The air system shall be equipped with an air dryer located before the first (supply system) air tank. The air dryer system sha ll operate automatically and be sized to eliminate moisture and oil in the air system at maximum air compressor discharge volume when engine is at full rated speed and load. The air dryer system shall require minimum routine maintenance. Desiccant shall be replaceable by spin -on filter in 15 minutes or less.

Air system dryer components shall be readily accessible for service and inspection. To the extent practical, disconnection or removal of components unrelated to a specific maintenance and/or repair task shall be unnecessary. Alternating tower air dryers will not be permitted. The air system air dryer shall be located as far from the compressor as possible and in ambient air flow to allow air to cool prior to entering the air dryer. Inlet air temperature to the dryer shall not exceed 150 degrees F.

Requirement for Additional Oil Separator Provision
A provision shall be included to collect/remove oil from the air system to prevent affecting function and/or damaging pneumatic system components. The oil separ ator shall operate automatically and be sized to eliminate moisture and oil in the air system at maximum air compressor discharge volume when engine is at full rated speed and load.

ELECTRICAL, ELECTRONIC AND DATA COMMUNICATION SYSTEMS (TS 40-TS 45)
TS 40. Overview
The Contractor shall coordinate a technical review with the LACMTA covering control system integration, installation, and design. As part of the technical review, the Contractor shall advise the LACMTA concerning control system features, options, and acces sories, and shall conform, to the degree possible, to those already in use at the LACMTA in an effort to increase component and system commonality. The Contractor shall provide documentation including a description of control system operation and system schematics.

A listing of the software part number and revision number and procedure for obtaining new releases shall be identified for each component which is software controlled.

The electrical system will consist of vehicle battery systems and components that generate, distribute and store power throughout the vehicle (i.e., generator, voltage regulator, wiring, relays and connectors).

Electronic devices are individual systems and components that process and store data, integrate electronic information or perform other specific functions.

The data communication system consists of the bi-directional communications networks that electronic devices use to share data with other electronic devices and systems. Communication networks are essential to integrating electronic functions, both onboard the vehicle and off.

Information level systems that require vehicle information for their operations or provide information shall adhere to J1939 data standard.

Data communications systems are typically divided into three levels to reflect the use of multiple data networks:
• Drivetrain level : Components related to the drivetrain including the propulsion system components (engine and transmission), and anti-lock braking system (ABS), which may include traction control. • Information level: Components whose primary function is the collection, control or display of data that is not necessary to the safe drivability of the vehicle (i.e., the vehicle will continue to operate when those functions are inoperable). These components ty pically consist of those required for automatic 71 Conformed Group A - 40-Foot CNG Technical Specifications Contract No: OP28367-000 Issued January 19, 2019 Modification No. 12 REV 1.14.19 vehicle location (AVL) systems, destination signs, fare boxes, passenger counters, radio systems, automated voice and signage systems, video surveillance and similar components. • Multiplex level: Electrical or electronic devices controlled through input/output signals such as discrete, analog and serial data information (i.e., on/off switch inputs, relay or relay control outputs).

Multiplexing is used to control components not typically found on the drivetrain or information levels, such as lights; wheelchair lifts; doors; heating, ventilation and air conditioning (HVAC) systems; and gateway devices.

← All documents from this meeting