of Environmental Assessment #9-21; Specific Plan #2-21; Lot Merger #1-21; Site Plan Review #11-21; and Development Agreement #1-21. The City shall promptly notify the applicant of any claim, action, or proceeding and the City shall cooperate fully in the defense. If the City fails to promptly notify the applicant of any claim, action, or proceeding, or if the City fails to cooperate fully in the defense, the applicant shall not thereafter be responsible to defend, indemnify, or hold harmless the City. Although the applicant is the real party in interest in action, the City may, at its sole discretion, participate in the defense of any action with the attorneys of its own choosing, but such participation shall not relieve the applicant of any obligation under this condition, including the payment of attorneys’ fees.

GC 8. The applicant shall comply with all mitigation measures set forth in the Mitigation Monitoring and Reporting Program adopted for the Project under Resolution No. 6693.

PLANNING
PL1. The approvals granted herein shall be utilized within the time period that the Development Agreement is in effect. Utilization shall mean the issuance of building permits.

PL2. These Conditions of Approval and the signed acknowledgement of acceptance shall be copied in their entirety and placed directly onto a separate plan sheet behind the cover sheet of the development plans prior to Building and Safety plan check submittal. Said copies shall be included in all development plan submittals, including revisions and the final working drawings.

PL3. The applicant shall submit for review and approval detailed landscape and irrigation plans prepared by a licensed landscape architect to the Director of Community Development or designee that is consistent with the State’s Water Efficient Landscape Guidelines. At a minimum, tree size shall be 24-inch box and shrubs shall be five (5) gallon size. Metal cages, painted green, shall be used to protect irrigation check valves and controller, and consistent with the landscape plans approved by the City Council.

PL4. The applicant shall submit a site lighting plan, with photometrics, for review and approval to the Community Development Department prior to the issuance of building permits. The plan shall ensure that all exterior lighting (i.e., parking areas, building areas, and entries) shall employ illumination in a manner that meets the approval of the Building Official and the Director of Community Development or designee before building permits are issued. All light fixtures shall be designed and located in a manner that does not allow spillover onto adjacent properties. All light fixtures shall further comply with the requirements of the specific plan. The plans shall demonstrate an average of 2-foot candles of light, with a minimum of 1-foot candle for all public and common areas. 1450 Artesia Blvd Specific Plan

Page 3 ends

PL5. Colors and materials as shown on the development plans under Exhibit B, are approved. Deviation from colors and materials shall be processed in accordance with the procedures in the Specific Plan.

PL6. A master sign program shall be submitted to the Community Development Director for administrative approval. The master sign program shall include identification and wayfinding signage throughout the Specific Plan Area.

PL7. The applicant/developer shall place all mailboxes in accordance with U.S.

Postal Regulations, as reviewed and approved by the Director of Community Development and the Gardena Postmaster prior to the issuance of a Certificate of Occupancy.

PL8. The development shall comply with all development standards of the 1450 Artesia Specific Plan.

PL9. The applicant shall reimburse the City for all attorney’s fees spent in processing the project application, including review of all documents required by these conditions of approval.

PL10. All landscaping shall be maintained in a healthy and well-kept manner at all times. Dead or damaged landscape material/vegetation shall be replaced immediately per the approved landscape plan. The irrigation system shall be maintained at all times. Trees on private property shall be permitted to grow to their maximum height.

PL11. The applicant shall maintain the building in good condition at all times and shall repaint the approved buildings and accouterments every eight years at a minimum. The Director of Community Development or designee may require more frequent painting if the improvements are not maintained in good condition.

PL12. The applicant shall submit a parcel map prepared by a qualified California civil engineer or licensed surveyor for the formal merger of the six parcels into a single lot, in compliance with GMC Title 17 and the Subdivision Map Act. The merger must be recorded on the property prior to the issuance of a certificate of occupancy.

PROJECT DESIGN FEATURES
DF 1. The Project shall be designed to be all-electric and there shall be no connection to natural gas infrastructure.
1450 Artesia Blvd Specific Plan

Page 4 ends

DF 2. The applicant shall ensure that the Final RAP, coordinated by ARC, is implemented prior to the commencement of construction. The portion of the project site overlapping the sump areas and the top of the engineered cap shall be paved and used as a parking lot, as depicted in Exhibit B.

DF 3. The applicant will comply with all institutional controls that DTSC may require as part of the ongoing use of the site, except for those assigned to ARC as part of its Final RAP.

DF 4. The applicant shall install a soil vapor barrier and ventilation systems beneath the proposed structure to prevent indoor soil vapor intrusion, in accordance with the guidelines outlined in the Vapor Intrusion Mitigation Advisory published by DTSC and CalEPA.

BUILDING & SAFETY
BS1. The applicant shall comply with all applicable portions of the most current California Building Standards Code (Title 24, California Code of Regulations) in effect at the time of permit application.

BS2. The applicant shall obtain separate Building Division including permits for Demolition, Grading, Building, Electrical, Plumbing, Mechanical, and Fences and Walls if required.

BS3. The applicant shall comply with all conditions set forth by other departments and agencies, including but not limited to: Gardena Planning, Gardena Public Works, and Los Angeles County Fire Department.

BS4. The applicant shall comply with the latest adopted Los Angeles County Fire Code and Fire Department requirements, as applicable.

BS5. The applicant shall demonstrate that coverages has been obtained under California’s General Permit for Stormwater Discharges Associated with Construction Activity by providing a copy of the Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of the subsequent notification of the issuance of a Waste Discharge Identification (WDID) Number or other proof of filing shall be provided to the Chief Building Official and the City Engineer. Projects subject to this requirement shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP). A copy of the SWPPP shall be kept at the project site and be available for review on request. Best Management Practices shall be used during construction to prevent construction materials and soil from entering the storm drain.

BS6. The applicant shall submit a Final Priority WQMP to the Building Division for review and approval. This plan shall be in conformance with all current NPDES requirements. The WQMP must implement Low Impact Development (LID) principles such that projects infiltrate, harvest, re-use, evaporation, or bio-treat 1450 Artesia Blvd Specific Plan

Page 5 ends

storm water runoff. Sheet flowing storm-water, without filtering, is no longer acceptable.

BS7. Prior to demolition activities, an asbestos survey shall be conducted by an Asbestos Hazard Emergency Response Act (AHERA) and California Division of Occupational Safety and Health (Cal/OSHA) certified building inspector to determine the presence or absence of asbestos containing-materials (ACMs).

BS8. A grading plan shall be submitted by the applicant/developer to the Building Official for review and approval. Grading shall be in substantial conformance with the proposed project plans.

BS9. The applicant shall provide a complete hydrology and hydraulic study prepared by a qualified engineer, and comply with the recommendations of the engineer, to the satisfaction of the Building Official.

BS10. The applicant shall submit a Final Geotechnical Investigation for City review/approval and comply with its recommendations and any revisions deemed necessary by the City’s Building Official. The Gardena Building Services Division will review construction plans to verify compliance with standard engineering practices, the GMC/CBSC, and the Geotechnical Investigation’s recommendations.

BS11. The applicant shall prepare construction and demolition waste recycling plans for review and approval by the Building Division. The applicant shall enroll in the city’s waste diversion program.

BS12. The applicant shall post procedures and phone numbers at the construction site for notifying the City, local Police Department, and construction contractor (during regular construction hours and off- hours), along with permitted construction days and hours, complaint procedures, and who to notify in the event of a problem.

BS13. The applicant shall notify neighbors and occupants within 300 feet of the project construction area at least 30 days in advance of anticipated times when noise levels are expected to exceed limits established in the noise element of the general plan or noise ordinance.

BS14. The applicant/contractors shall adhere to the City’s Labor Transparency regulations in accordance with Ordinance No. 1874. This requires, in part, contractors and subcontractors involved in the project to disclose any pending or final determinations related to state or federal labor violations, along with any penalties paid, within the past five years.

BS15. The applicant shall designate an on-site construction complaint and enforcement manager for the project.
1450 Artesia Blvd Specific Plan

Page 6 ends

BS16. The applicant shall ensure that all construction equipment is properly maintained per manufacturers’ specifications and fitted with the best available noise suppression devices (e.g., improved mufflers, equipment redesign, use of intake silencers, ducts, engine enclosures, and acoustically attenuating shields or shrouds silencers, wraps). All intake and exhaust ports on power equipment shall be muffled or shielded.

PUBLIC WORKS – ENGINEERING DIVISION
PW1. All work in the public right of way shall be constructed in accordance with the Standard Plans and Standard Specifications for Public Works Construction, latest edition and the City and State Codes as applicable. This includes supplements thereto and City of Gardena Standard Drawings. All work shall be designed and signed by a registered Civil Engineer or other applicable professional license engineer(s).

PW2. Before undertaking any Encroachment/Excavation within the public right of way, the applicant must first obtain the applicable permit from the Public Works Engineering Division.

PW3. The project shall utilize the County’s benchmarks and any controlling survey monumentation (property lines, tract lines, street centerline, etc.) which are at risk of being destroyed or disturbed during the course of the project must be preserved in accordance with Section 8771(b) of the California Business and Professions Code (Professional Land Surveyors Act). Preconstruction field ties, along with the preparation and filling of the required Corner Records or Record of Survey with the County of Los Angeles, shall be accomplished by, or under the direction of, a licensed surveyor or civil engineer authorized to practice land surveying.

Copies of said records shall be furnished to the City Engineering for review and approval prior to issuance of any onsite or offsite construction permit. In addition, any monuments disturbed or destroyed by this project must be reset and post-construction Corner Records or Record of Survey filed with the County of Los Angeles. A copy of the recorded documents shall be submitted to the Engineering office for review and approval prior to issuance and/or finalizing any permits within the public right of way.

PW4. Prior to issuance of permits, all public improvements (if any) shall be guaranteed to be installed by the execution of an Agreement for Pubic Improvements secured by sufficient bond sureties or cash, complete indemnification form, Certification of Insurance (General Liability, Auto & Workers Compensation) naming City of Gardena as additional insured, contractor State License and City Business License.
1450 Artesia Blvd Specific Plan

Page 7 ends

PW5. The applicant shall remove and replace all sidewalk, curb, gutter, driveway, and street signages fronting property along Artesia Boulevard. The applicant shall submit improvement plans to the City Public Works department that show all sidewalk structures plus, all incidental improvements such traffic markings, re-paint existing curbs, install traffic signs, curb drains, etc.

PW6. The applicant submit improvement plans for trees to be located in the sidewalks on Artesia Boulevard to the City Public Works Department for review and approval.

PW7. Prior to the issuance of demolition or construction permits, the applicant shall prepare and implement a construction management plan, which shall be reviewed and approved by the Public Works Director. The Public Works Director may revoke any approvals if significant impacts arise. The plan must ensure that pedestrian access remains unimpeded at all times and that no materials are staged in any public right-of-way.

PW8. Pedestrian access to all surrounding public sidewalks shall be provided at all times, except during such times as improvements are being made to the sidewalks as required by these conditions.

PW9. The applicant shall provide traffic control plans per WATCH (Work Area Traffic Control Handbook) and/or California MUTCD (California Manual on Uniform Traffic Control Devices) per the latest standard pending proposed controls (permanent‐overnight or temporary). The temporary/permanent traffic control plans shall be prepared by, or under the direction of, a licensed civil engineer or other authorized to practice traffic engineering.

PW10. The applicant shall provide Street Improvement Plans showing all requirements and submit them to the Public Works Department for review and approval. The Street Improvement Plan shall be stamped and signed by a Civil Engineer Registered in the state of California. As‐built plan signed and stamped by the Engineer of Record shall be submitted to the Public Works Department prior to finalizing and closing permit. Any deviations from the approved plan will require a submittal of plan revision for the City review and approval.

PW11. The applicant is responsible for all applicant permit, plan check, surety, and other incidental fees pertaining to the proposed project.

STANDARD CONDITIONS TO REDUCE IMPACTS (Gardena Municipal Code Section

18.42.210. C, D, and E)
GMC1. Prior to commencement of ground-disturbing activities, a qualified vertebrate paleontologist (as defined by the Society for Vertebrate Paleontology) shall 1450 Artesia Blvd Specific Plan

Page 8 ends

develop Worker Awareness and Environmental Program (WEAP) Training for construction personnel. This training shall be presented to construction personnel and include what fossil remains may be found within the Project area and policies and procedures that must be followed in case of a discovery.

Verification of the WEAP Training shall be provided to the Gardena Community Development Department.

GMC2. If fossils or fossil bearing deposits are encountered during ground-disturbing activities, work within a 25-foot radius of the find shall halt and a professional vertebrate paleontologist (as defined by the Society for Vertebrate Paleontology) shall be contacted immediately to evaluate the find. The paleontologist shall have the authority to stop or divert construction, as necessary. Documentation and treatment of the discovery shall occur in accordance with Society of Vertebrate Paleontology standards. The significance of the find shall be evaluated pursuant to the State CEQA Guidelines. If the discovery proves to be significant, before construction activities resume at the location of the find, additional work such as data recovery excavation may be warranted, as deemed necessary by the paleontologist and full-time paleontological monitoring shall occur for the remainder of ground disturbance for the project.

GMC3. If Native American or tribal cultural resources are found on the site, the applicant shall enter into a cultural resources treatment agreement with a local Native American tribe traditionally and culturally affiliated with Gardena that is acknowledged by the Native American Heritage Commission, which shall address the following:
a. Treatment and disposition of cultural resources;
b. Designation, responsibilities, and participation of professional tribal monitors during grading, excavation and ground disturbing activities; c. Project grading and development scheduling;
d. Terms of compensation for the tribal monitors;
e. Treatment and final disposition of any cultural resources, sacred sites, and human remains discovered on site;
f. Tribal monitor’s authority to stop and redirect grading in order to evaluate the significance of any potential resources discovered on the property, and to make recommendations as to treatment; and
g. The applicant’s agreement to relinquish ownership of all cultural resources, including all archaeological artifacts that are found on the project area, to the tribe for proper treatment and disposition; and the applicant’s agreement that all tribal sacred sites are to be avoided and preserved.

GMC4. In compliance with state law, if human remains are unearthed, the project developer, pursuant to State Health and Safety Code Section 7050.5, will contact the county coroner and ensure no further disturbance occurs until the 1450 Artesia Blvd Specific Plan

Page 9 ends

county coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code Section 5097.98.

GMC5. If the remains are determined to be of Native American descent, the Native American Heritage Commission (NAHC) must be notified within twenty-four hours.

GMC6. Construction, grubbing, brushing, or tree removal shall be conducted outside of the state identified nesting season for migratory birds (typically March 15th through September 1st) if possible. If construction is conducted during nesting season, a pre-construction nesting bird survey shall be conducted within and immediately adjacent to the project site by a qualified professional biologist no more than seven days prior to the beginning of any project-related physical activity that is likely to impact migratory birds. If active nests are found during the pre-construction nesting bird survey, a nesting bird plan (NBP) shall be prepared by a qualified biologist and implemented during construction. At a minimum, the NBP shall include guidelines for addressing active nests, establishing buffers, monitoring, and reporting. The size, location and duration of all buffer zones, if required, shall be based on the nesting species, nesting stage, nest location, its sensitivity to disturbance, and intensity and duration of the disturbance activity. The buffers shall be maintained until the breeding season has ended or until a qualified professional biologist has determined that the birds have fledged and are no longer reliant upon the nest or parental care for survival.

GOLDEN STATE WATER COMPANY
GS1. The applicant shall contact Golden State Water Company for review of the existing water main once Los Angeles County Fire Department has issued their fire protection requirements on the project to initiate application for new service installation.

LOS ANGELES COUNTY FIRE DEPARTMENT
FD1. The applicant shall submit plans and specifications to the County of Los Angeles Fire Department Fire Prevention Engineering Section Building Plan Check Unit for review prior to building permit issuance.

LOS ANGELES COUNTY SANITATION DISTRICTS
SD1. The applicant shall pay a connection fee before a permit to connect to the sewer is issued. For more specific information regarding the connection fee application procedure and fees, please contact the Connection Fee Counter at (562) 908- 4288, extension 2727.
1450 Artesia Acquisition Company LLC, certifies that it has read, understood, and agrees to the Project Conditions listed herein.
1450 Artesia Blvd Specific Plan

Page 10 ends

____________________________________________
1450 Artesia Acquisition Company LLC, Representative
By______________________________________
Dated__________________________________
403644764.2

RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:

CITY CLERK

CITY OF GARDENA
1700 W. 162nd Street
Gardena, California 90247
Space Above Reserved for Recorder’s Use
EXEMPT FROM RECORDER’S FEES
Pursuant to Government Code § 6103

DEVELOPMENT AGREEMENT

BY AND AMONG

THE CITY OF GARDENA
AND
1450 ARTESIA ACQUISITION COMPANY LLC

THIS AGREEMENT SHALL BE RECORDED WITHIN TEN DAYS OF EXECUTION BY

ALL PARTIES HERETO PURSUANT TO THE REQUIREMENTS OF GOVERNMENT CODE §65868.5.







 


403644764.2
i

TABLE OF CONTENTS

1. Definitions. ..................................................................................................................................... 1

2. Recitals. ........................................................................................................................................... 3

3. Binding Effect. ................................................................................................................................ 4

3.1 Constructive Notice and Acceptance. ................................................................................... 4

3.2 Rights to Assign and Transfer. ............................................................................................. 4

3.3 Liabilities Upon Transfer. ..................................................................................................... 4

3.4 Resumption of Rights. .......................................................................................................... 5

4. Development of the Property. ......................................................................................................... 5

4.1 Permitted Uses and Design and Development Standards. .................................................... 5

4.2 Entitlement to Develop. ........................................................................................................ 5

4.3 Building Regulations. ........................................................................................................... 5

4.4 Subsequent Rules. ................................................................................................................. 5

4.5 Fees, Exactions, Mitigation Measures, Conditions, Reservations and Dedications. ............ 5

4.6 Use of Easements.................................................................................................................. 6

4.7 Timing of Development........................................................................................................ 6

4.8 Moratorium. .......................................................................................................................... 6

4.9 Term...................................................................................................................................... 7

4.10 Term of Map(s) and Other Project Approvals. ..................................................................... 7

4.11 Future Approvals. ................................................................................................................. 7

4.12 Site Plan Review. .................................................................................................................. 8

4.13 Issuance of Building Permits. ............................................................................................... 8

5. Developer Agreements.................................................................................................................... 8

5.1 General. ................................................................................................................................. 8

5.2 Digital Display. ..................................................................................................................... 9

5.3 Development Fees. ............................................................................................................. 10

5.4 Maintenance Obligations. ................................................................................................... 11

5.5 Sales and Use Tax............................................................................................................... 11

5.6 Local Hire. .......................................................................................................................... 11 






 


403644764.2
ii

6. City Agreements. .......................................................................................................................... 11

6.1 Expedited Processing. ......................................................................................................... 11

6.2 Processing Cooperation and Assistance. ............................................................................ 12

6.3 Processing During Third-Party Litigation. ......................................................................... 12

6.4 Performance of Director Duties. ......................................................................................... 12

6.5 No Amendment to Specific Plan. ....................................................................................... 12

7. Modification/Suspension. ............................................................................................................. 12

8. Demonstration of Good Faith Compliance. .................................................................................. 13

8.1 Review of Compliance. ...................................................................................................... 13

8.2 Good Faith Compliance. ..................................................................................................... 13

8.3 City Report - Information to be Provided to Developer. .................................................... 13

8.4 Developer’s Report. ............................................................................................................ 13

8.5 Notice of Non-Compliance; Cure Rights. .......................................................................... 13

8.6 Public Notice of Finding..................................................................................................... 13

8.7 Failure of Periodic Review. ................................................................................................ 13

9. Excusable Delays. ......................................................................................................................... 14

10. Default Provisions. ..................................................................................................................... 14

10.1 Default. ............................................................................................................................... 14

10.2 Content of Notice of Violation. .......................................................................................... 14

10.3 Remedies for Default. ......................................................................................................... 15

10.4 Resolution of Disputes........................................................................................................ 15

10.5 Attorney’s Fees and Costs. ................................................................................................. 15

11. Mortgagee Protection. ................................................................................................................ 15

11.1 Mortgage Not Rendered Invalid. ........................................................................................ 15

11.2 Request for Notice to Mortgagee. ....................................................................................... 16

11.3 Mortgagee’s Time to Cure. ................................................................................................. 16

11.4 Cure Rights. ........................................................................................................................ 16

11.5 Bankruptcy.......................................................................................................................... 16

11.6 Disaffirmation. .................................................................................................................... 16

12. Estoppel Certificate. ................................................................................................................... 16

13. Administration of Agreement. ................................................................................................... 17 






 


403644764.2
iii

13.1 Appeal of Staff Determinations. ......................................................................................... 17

13.2 Operating Memoranda. ....................................................................................................... 17

13.3 Certificate of Performance. ................................................................................................. 17

14. Amendment or Termination by Mutual Consent. ...................................................................... 18

15. Indemnification/Defense….……………………………………………………………..……..18

15.1 Indemnification. .................................................................................................................. 18

15.2 Defense of Agreement. ....................................................................................................... 18

16. Cooperation in the Event of Legal Challenge. ........................................................................... 18

16.1 Third-Party Challenges. ...................................................................................................... 18

16.2 Third-Party Challenges Related to the Applicability of City Laws.................................... 19

17. Time of Essence. ........................................................................................................................ 20

18. Effective Date. ........................................................................................................................... 20

19. Notices. ...................................................................................................................................... 20

20. Entire Agreement. ...................................................................................................................... 21

21. Waiver. ....................................................................................................................................... 21

22. Supersession of Subsequent Laws of Judicial Action................................................................ 21

23. Severability. ............................................................................................................................... 21

24. Relationship of the Parties. ........................................................................................................ 21

25. No Third-Party Beneficiaries. .................................................................................................... 21

26. Recordation of Agreement and Amendments. ........................................................................... 22

27. Cooperation Between City and Developer. ............................................................................... 22

28. Rules of Construction. ............................................................................................................... 22

29. Joint Preparation. ....................................................................................................................... 22

30. Governing Law and Venue. ....................................................................................................... 22

31. Counterparts. .............................................................................................................................. 22

32. Weekend/Holiday Dates. ........................................................................................................... 22

33. Not a Public Dedication. ............................................................................................................ 22

34. Releases...................................................................................................................................... 23

35. Consent. ..................................................................................................................................... 23 






 


403644764.2
1 DEVELOPMENT AGREEMENT
This Development Agreement (“Agreement”) is made and entered into by and among the CITY OF GARDENA, a municipal corporation (“City”) and 1450 ARTESIA ACQUISITION COMPANY LLC, a Delaware Limited Liability Corporation authorized to do business in California (“Developer”) as of this 11th day of March, 2025. City and Developer are referred to hereinafter individually as “Party” and collectively as “Parties.” In consideration of the mutual covenants and agreements contained in this Agreement, City and Developer agree as follows:

1. Definitions. Unless the contrary is stated or clearly appears from the context, the following definitions govern the construction of the words and phrases used in this Agreement. Words and phrases not defined in this Section will have the meaning set forth in this Agreement, the Gardena Municipal Code, or in common usage.
“Applicable Rules” mean:
x The Gardena General Plan, as it existed on the Approval Date, as modified by the Project Approvals;
x The Gardena Municipal Code, as it existed on the Approval Date, as modified by the Project Approvals;
x Such other laws, ordinances, rules, regulations, and official policies governing permitted uses of the property, density, design, improvement, development fees, and construction standards and specifications applicable to the development of the Property in force at the time of the Effective Date, which are not in conflict with this Agreement.
“Approval Date” means March 11, 2025, the date on which the last of the Project Approval applications were approved by the City Council.
“Approved Plans” mean a plan for any aspect of the Project, including, without limitation, the Site Plan, signage plans, and landscaping and irrigation plans, which are approved by the City in accordance with the Applicable Rules, and Project Approvals. “Building Regulations” means those regulations set forth in Title 15 of the GMC. “CEQA” means the California Environmental Quality Act, Public Resources Code § 21000 et seq.
“CEQA Guidelines” mean the regulations implementing CEQA which have been adopted by the State and found at Title 14 of the California Code of Regulations, § 150000 et seq. “City” means the City of Gardena, a municipal corporation. “City Council” means the City Council of the City of Gardena. “Developer” means 1450 Artesia Acquisition Company LLC, a Delaware Limited Liability 






 


403644764.2
2 Corporation authorized to do business in California, and its transferees, assigns and successors in interest.
“Development Standards” mean the design and development standards that are applicable to the Project as set forth in the Specific Plan.
“Director” means the Director of Community Development or his designee. “Effective Date” means the date on which the Enabling Ordinance becomes effective in accordance with Government Code § 36937.
“Enabling Ordinance” means Ordinance No, ______, approving this Development Agreement.
“Future Approvals” mean such subsequent discretionary and ministerial entitlements and permits, which are required to develop the Project in addition to the Project Approvals, and which are applied for by the Developer and approved by the City. Once approved, a Future Approval becomes part of the Project Approvals.
“GMC” means the Gardena Municipal Code.
“Party” means the City or the Developer.
“Parties” shall mean both the City and the Developer.
“Person” means a natural person or any entity.
“Project” means the development of the Property in accordance with the Project Approvals. “Project Approvals” mean:
x Final Environmental Impact Report (FEIR) No. _____, as certified by Resolution No. _____ on February 25, 2025;
x Mitigation Monitoring and Reporting Program for FEIR No. _____, as certified by Resolution No. _____ on February 25, 2025;
x 1450 Artesia Boulevard Specific Plan No. _____, as adopted by Ordinance No. _____ on March 11, 2025;
x Zone Text Amendment No. _____, as approved by Ordinance No. _____ on March 11, 2025
x Lot Merger and Parcel Map No. _____, as approved by Resolution No. _____ on _____, 2025
x Site Plan Review _____, as approved by Resolution No. ____ on _____, 2025; x This Development Agreement No. _____, as approved by Ordinance No. _____ on March 11, 2025.
“Property” collectively refers to the approximately 6.34 acres of land located at the 






 


403644764.2
3 southwest corner of Artesia and Normandie Boulevards in the City of Gardena, as further described in Exhibit A, attached hereto, and incorporated herein by reference. “Site Plan” refers to the development plan for the Property as shown on Exhibit B, attached hereto, and incorporated herein by reference.
“Specific Plan” means the 1450 Artesia Specific Plan.
“Subsequent Rules” mean any deletions from or any changes or additions to the Applicable Rules made after the Effective Date, including, without limitation, any change by means of an ordinance, initiative, resolution, policy, order or moratorium, initiated or instituted for any reason whatsoever and adopted by the City Council, the Planning Commission or any other board, agency, commission or department of the City, or any officer or employee thereof, or by the electorate, which would, absent this Agreement, otherwise apply to the Property. “Term” shall have the same meaning ascribed to it in Section 4.9 hereof. “Transferee” means a Person who assumes in whole or in part the rights and obligations under this Agreement with respect to all or a portion of the Property.

2. Recitals. This Agreement is made with respect to the following facts and for the following purposes, each of which is acknowledged as true and correct by the Parties:

2.1 Pursuant to Government Code § 65865 et seq., the City is authorized to enter into a binding contractual agreement with any person having a legal or equitable interest in real property for the development of such property.

2.2 Developer has a legal or equitable interest in the Property.

2.3 Developer desires to redevelop the Property in accordance with the Project Approvals, the Applicable Rules and this Agreement.

2.4 By this Agreement, each Party desires to obtain the binding agreement of the other Party to develop the Property in accordance with the Project Approvals, the Applicable Rules, and this Agreement. In consideration thereof, the City agrees to limit the future exercise of certain of its governmental and proprietary powers to the extent specified in this Agreement.

2.5 City and Developer have acknowledged and agreed that the consideration that is to be exchanged pursuant to this Agreement is fair, just, and reasonable.

2.6 The Project is consistent with the City’s General Plan designation of Specific Plan and the zoning of 1450 Artesia Specific Plan.

2.7 Development of the Project has furthered, and will continue to further, the comprehensive planning objectives contained within the General Plan, and will result in public benefits, including, among others, the following:







 


403644764.2
4 2.7.1 Redevelop an underutilized, blighted and environmentally impacted property with economically vibrant industrial and commercial uses and a state of the art, aesthetically pleasing design and functionality along a major development corridor within the City;

2.7.2 Develop appropriate uses in an area with a legacy of contamination in a manner that protects human health and the environment and allows for continued monitoring of remediated areas;

2.7.3 Produce short-and long-term jobs during the Proposed Project’s construction and operations phases;

2.7.4 Generate business license, property and sales tax revenues for the City to enhance its services to the community and infrastructural improvements;

2.7.5 A one-time contribution of one million dollars to the City’s General Fund which the City may use for any public purpose benefiting its residents;

2.7.6 Provide the City with space to hold community events;

2.7.7 Develop uses that are compatible with the Project Site’s historic industrial operations and surrounding uses along the Artesia Boulevard Corridor;

2.8 On February 4, 2025, the Planning Commission of the City commenced a duly noticed public hearing on the Project Approvals. At the conclusion of the hearing, the Planning Commission recommended that the City Council approve the Project Approvals.

2.9 On February 25, 2025, the City Council commenced a duly noticed public hearing on the Project Approvals. Prior to approving this Agreement by the Enabling Ordinance, the City Council adopted Resolution No. _____ certified the FEIR.

2.10 All of the Property is subject to this Agreement.

3. Binding Effect. The burdens of this Agreement are binding upon, and the benefits of the Agreement inure to, the City and the Developer and each successive Transferee, assign and successor in interest thereto and constitute covenants that run with the land. Any and all rights and obligations that are attributed to the Developer under this Agreement shall run with the land.

3.1 Constructive Notice and Acceptance. Every Person who acquires any right, title, or interest in or to any portion of the Property in which the Developer has a legal interest is, and shall be, conclusively deemed to have consented and agreed to be bound by this Agreement, whether or not any reference to this Agreement is contained in the instrument by which such Person acquired such right, title or interest.

3.2 Rights to Assign and Transfer. Developer may assign or transfer its rights and obligations under this Agreement with respect to the Property, or any portion thereof, to any Person 






 


403644764.2
5 at any time during the term of this Agreement without approval of the City. For purpose of this Agreement, the Transferee must be considered the “owner” of that portion of the Property which is covered by such transfer.

3.3 Liabilities Upon Transfer. Upon the delegation of the duties and obligations under this Agreement and the sale, transfer or assignment of all or any portion of the Property, Developer will be automatically released from its obligations under this Agreement with respect to the Property, or portion thereof, so transferred arising prior and subsequent to the effective date of such transfer, if: (i) Developer has provided to the City prior or subsequent written notice of such transfer; and (ii) the Transferee has agreed in writing to be subject to all of the provisions hereof applicable to the portion of the Property so transferred by executing an Assignment and Assumption Agreement in the form of Exhibit C attached hereto and incorporated herein by reference. Upon any transfer of any portion of the Property and the express assumption of Developer’s obligations under this Agreement by such Transferee, the City agrees to look solely to the Transferee for compliance by such Transferee with the provisions of this Agreement as such provisions relate to the portion of the Property acquired by such Transferee. Any such Transferee shall be entitled to the benefits of this Agreement as “Developer” hereunder and shall be subject to the obligations of this Agreement applicable to the parcel(s) transferred. A default by any Transferee shall only affect that portion of the Property owned by such Transferee and shall not cancel or diminish in any way Developer’s rights hereunder with respect to any portion of the Property not owned by such Transferee. The Transferee shall be responsible for satisfying the good faith compliance requirements set forth in Section 8 below relating to the portion of the Property owned by such Transferee, and any amendment to this Agreement between the City and a Transferee shall only affect the portion of the Property owned by such Transferee.

3.4 Resumption of Rights. If Transferee defaults with respect to any provision of this Agreement, Developer may, but is not obligated to, resume Transferee’s obligations upon written notification to City.

4. Development of the Property. The following provisions, in addition to the Applicable Rules, shall govern the development and use of the Property.

4.1 Permitted Uses and Design and Development Standards. The permitted, administratively permitted, and conditionally permitted uses of the Property, as well as the Development Standards, are set forth in the Project Approvals and Applicable Rules.

4.2 Entitlement to Develop. The Developer is granted the vested right to develop the Project subject to the Applicable Rules, the Project Approvals, and any Future Approvals during the Term.

4.3 Building Regulations. Notwithstanding Section 4.4 below, all construction on the Property shall adhere to the Building Regulations in effect at the time an application for a building permit is submitted and to any federal or state building requirements that are then in effect at such time. Additionally, nothing in this Agreement prevents the City from applying “standard specifications” for public improvements (e.g., streets, storm drainage, parking lot standards, 






 


403644764.2
6 driveway widths), as the same may be adopted or amended from time to time by the City, provided that the provisions of any such standards and specifications apply only to the extent they are in effect on a Citywide basis and so long as they do not conflict with the provisions of the Project Approvals and this Agreement.

4.4 Subsequent Rules. Subsequent Rules cannot be applied by the City to any part of the Property unless the Developer gives the City written notice of its election to have a Subsequent Rule applied to the Property, in which case such Subsequent Rule is deemed to be an Applicable Rule.

4.5 Fees, Exactions, Mitigation Measures, Conditions, Reservations and Dedications.

4.5.1 Subject to Sections 4.5.2 and 4.5.3 of this Agreement, all fees, exactions, mitigation measures, conditions, reservations, and dedications of land for public purposes that are applicable to the Project are set forth in the Applicable Rules, the Project Approvals, and this Agreement.

4.5.2 Except as otherwise provided in this Agreement, and specifically excluding fees set by entities not controlled by the City that are collected by the City, the City can only charge and impose those fees and exactions, including, without limitation, dedication and any other fee relating to development or the privilege of development, which are in effect on a City-wide basis as of the Effective Date.

4.5.3 This Section 4.5 shall not be construed to limit the authority of the City to charge normal and customary application, processing, and permit fees, including legal and environmental processing costs, for land use approvals, building permits and other similar permits, for Future Approvals, which fees are designed to reimburse City’s actual expenses attributable to such application, processing and permitting and are in force and effect on a City-wide basis at such time as applications for such approvals are filed with the City. Notwithstanding any term to the contrary in this Section 4.5.3, the Developer shall not be required to pay any new impact fees that are not in effect on the Effective Date.

4.6 Use of Easements. Notwithstanding the provisions of the Applicable Rules, easements dedicated for vehicular and pedestrian use shall be permitted to include easements for underground drainage, water, sewer, gas, electricity, telephone, cable, and environmental remediation and other utilities and facilities so long as they do not unreasonably interfere with pedestrian and/or vehicular use.

4.7 Timing of Development. In Pardee Construction Co. v. City of Camarillo (Pardee), 37 Cal.3d 465 (1984), the California Supreme Court held that the failure of the parties therein to provide for the timing or rate of development resulted in a later-adopted initiative restricting the rate of development to prevail against the parties’ agreement. City and Developer intend to avoid the result in Pardee by acknowledging and providing that Developer shall have the right, without obligation, to develop the Property in such order and at such rate and times as Developer deems appropriate within the exercise of its subjective business judgment subject to the terms of this 






 


403644764.2
7 Agreement.

In furtherance of the Parties’ intent, as set forth in this Section, no future amendment of any existing City ordinance or resolution, or future adoption of any ordinance, resolution, or other action, that purports to limit the rate or timing of development over time or alter the sequencing of development phases, whether adopted or imposed by the City Council or through the initiative or referendum process, shall apply to the Property. However, nothing in this Section shall be construed to limit City’s right to enforce Developer’s obligation pursuant to this Agreement to provide any infrastructure required by the Project Approvals and this Agreement.

4.8 Moratorium.

4.8.1 The City shall not impose a moratorium on the Property unless such is necessary to protect a significant threat to the immediate health, safety and welfare of the City based on substantial evidence in the record; provided, however, that: (i) any such moratorium shall last only as long as necessary to eliminate or prevent such a threat and shall terminate upon the elimination or termination of such a threat, and (ii) the Term (as defined in Section 4.9 hereof), including any extension thereof under Section 4.9 hereof, shall extend for a period of time equal to the duration of any such moratorium imposed.

4.8.2 Except as provided in Section 4.8.1 above, no City-imposed moratorium or other limitation (whether relating to the rate, timing or sequencing of the development or construction of all or any part of the Property, whether imposed by ordinance, initiative, resolution, policy, order or otherwise, and whether enacted by the City Council, an agency of the City, the electorate or otherwise) affecting parcel or subdivision maps (whether tentative, vesting tentative, or final), building permits, occupancy certificates, or other entitlements to use or service (including, without limitation, water and sewer), approved, issued or granted within the City, or portions of the City, applies to the Property to the extent such moratorium or other limitation is in conflict with this Agreement. However, the provisions of this Section do not affect the City’s compliance with moratoria or other limitations mandated by federal or state governmental agencies or courtimposed moratoria or other limitations.

4.9 Term. This Agreement shall be in effect for a period of ten (10) years from the Effective Date of the Enabling Ordinance. However, the Developer or the City shall be entitled to, by written notice to the other Party prior to the Agreement’s expiration, one (1) five-year (5- year) administrative extension, provided that the requesting Party is not in material default of this Agreement at such time beyond any applicable period to cure provided for by Sections 8.5 and 10 below. Before the expiration of the five-year (5-year) extension, the Parties may mutually agree to further extensions. In the event of litigation challenging this Agreement, the Term is automatically suspended for the duration of such litigation and resumes upon final disposition of such challenge and any appeal thereof upholding the validity of this Agreement. In the event that a referendum petition concerning this Agreement is duly filed in such a manner that the ordinance approving this Agreement is suspended, then the Term is deemed to commence upon City Council certification of the results of the referendum election approving this Agreement. 






 


403644764.2
8 4.10 Term of Map(s) and Other Project Approvals. Pursuant to California Government Code Sections 66452.6(a) and 65863.9, the term of the site plan review and tract map and any other subdivision or map that has been or in the future may be processed on all or any portion of the Property and the term of each of the Project Approvals shall be extended for a period of time through the scheduled termination date of this Agreement as set forth in Section 4.9 above, including any extensions thereto.

4.11 Future Approvals. Applications for Future Approvals will be processed by the City in accordance with the City procedural rules under the Applicable Rules. The City may deny an application for a Future Approval only if such application does not substantially comply with this Agreement or the Applicable Rules (provided, however, that inconsistency with the Project Approvals shall not constitute grounds for denial of a Future Approval which is requested by the Developer as an amendment to that Project Approval). The City may approve an application for such a Future Approval subject to any conditions necessary to bring the Future Approval into compliance with this Agreement or the Applicable Rules, or as necessary to make this Future Approval consistent with the Project Approvals. If the City denies any application for a Future Approval, the City must specify in writing the reasons for such denial, the City shall have substantial evidence supporting such a denial, and it may suggest a modification which would be approved. Any such specified modifications must be consistent with this Agreement and the Applicable Rules, including the Project Approvals, and the City shall approve the application if it is subsequently resubmitted for the City review and addresses the reason for the denial in a manner that is consistent with this Agreement and the Applicable Rules, including the Project Approvals

4.11.1 Minor Modifications to Project. The Developer may make minor changes to the Project and Project Approvals (“Minor Modifications”) without the need to amend this Agreement upon the administrative approval of the Director. (a) Minor Modifications include:
(i) A modification to the Site Plan, provided the Director determines, in his/her discretion, that the Site Plan is substantially similar to the approved Site Plan attached hereto as Exhibit B and complies with the Specific Plan; and there is no change which would qualify as a Major Modification under Section 4.11.2 below; (ii) A “minor” modification to the Specific Plan as identified in Section 8.6 thereof; and
(iii) any other change that does not qualify as a Major Modification as defined below.
(b) The City shall not unreasonably withhold or delay approval of any Minor Modification. The City shall have the right to impose reasonable conditions in connection with Minor Modifications, provided, however, such conditions shall not be inconsistent with the Applicable Rules, the Project Approvals or with the development of the Project as contemplated by this Agreement.







 


403644764.2
9 (c) A Minor Modification approved by the City shall continue to constitute a Project Approval as referenced herein.

4.11.2 Modifications Requiring Amendment to this Agreement. Any proposed modification to the Project which results in any of the following shall constitute a Major Modification, and shall require an amendment to this Agreement pursuant to Section 14 below:
(a) Any change which constitutes a “significant” modification to the Specific Plan as identified in Section 8.6 thereof; or
(b) Any change which creates a new significant environmental impact which cannot be mitigated to a level of insignificance.

4.12 Site Plan Review. Any change to the site plan shall require Site Plan Review approval in accordance with Chapter 18.44 of the Gardena Municipal Code unless any such change constitutes a Minor Modification under Section 4.11.1.(a)(i) hereof.

4.13 Issuance of Building Permits. No building permit, final inspection or Certificate of Occupancy will be unreasonably withheld, conditioned, or delayed from the Developer if all infrastructure required to serve the portion of the Property covered by the building permit, final inspection, or Certificate of Occupancy is in place or is suitably guaranteed to be completed (by covenant, bond, letter of credit or otherwise) to the reasonable satisfaction of the City prior to completion of construction and all of the other relevant provisions of the Project Approvals, Future Approvals and this Agreement have been satisfied.

5. Developer Agreements.

5.1 General. The Developer shall comply with: (i) this Agreement; (ii) the Project Approvals, including, without limitation, all mitigation measures required by the determination made pursuant to CEQA; and (iii) all Future Approvals for which it is the applicant or a successor in interest to the applicant.

5.1.1 In the event that any of the mitigation measures or conditions required of Developer hereunder have been implemented by others, Developer shall be conclusively deemed to have satisfied such mitigation measures or conditions consistent with CEQA. If any such mitigation measures or conditions are rejected by a governmental agency with jurisdiction, the Developer may implement reasonably equivalent substitute mitigation measures or conditions consistent with CEQA, to the City’s satisfaction, in lieu of the rejected mitigation measures or conditions. Such substitution shall be deemed to be a Minor Modification pursuant to Section

4.11.1 above.

5.2 Development Fees. No City development fees apply to the Project, and no development impact fees that the City may adopt during the Term shall apply to the Project. 






 


403644764.2
10 5.3 Maintenance Obligations. The Developer shall maintain all portions of the Property in its possession or control, and any improvements thereon, in a first class clean, neat, and orderly manner. The Parties’ respective maintenance obligations shall survive any termination or expiration of this Agreement, except that Developer’s maintenance obligations shall terminate upon a transfer of its complete interest in the Property to a third party, whereupon the maintenance obligation becomes an obligation of the third party acquiring that interest.

5.4 Sales and Use Tax.

5.4.1 In the event the contract price for any work on the Project is valued at five million dollars ($5,000,000) or more, Developer agrees to report, on a State Board of Equalization Tax Return, any purchases of tangible personal property made in connection with the finishing of and/or installation of materials, or fixtures for the Project, when such purchases were made without sales or use tax due. Developer shall indicate the City as a registered job site location on the State Board of Equalization Tax Return. In such event, Developer shall also obtain a permit or a subpermit from the State Board of Equalization indicating the City as the registered job site location, in accordance with Revenue and Taxation Code § 7051.3 or State Board of Equalization Compliance Policy and Procedure Manual § 295.060.

5.4.2 Developer further agrees that, if Developer retains contractors or subcontractors to perform a portion of work in the Project, and said contracts or subcontracts are valued at five million dollars ($5,000,000) or more, said contracts or subcontracts shall contain the provisions set forth in Section 5.5.1, above.

5.4.3 The Director of Finance of the City is authorized to relieve Developer and Developer’s contractors and subcontractors, from the requirements set forth in this Section 5.5 upon proof to the reasonable satisfaction of the Director of Finance that Developer and/or its contractors or subcontractors have made good faith efforts to obtain said permit or sub-permits, but were denied the same by the State Board of Equalization.

5.5 Public Benefits. Developer agrees to provide the following public benefits to the City in consideration of the City entering into this Development Agreement:

5.5.1 Local Hire. Developer shall use best efforts to hire locally-based construction workers as set forth in the Local Hiring Plan attached hereto as Exhibit D.

5.5.2 One-Time Payment. Developer shall make a one-time payment to the City in the amount of one million dollars ($1,000,000) which money shall be used for any public purpose deemed desirable by the City Council. Payment shall be made prior to Developer receiving a certificate of occupancy for any part of the building.

5.5.3. Use of Premises for Special Events. Developer shall allow the City to make use of an approximately 36,000 square foot portion of the property as depicted on Exhibit E attached hereto (the “Special Event Area”) for special events (“Special Events”) to be held approximately two to three times per month which shall not exceed 36 times per year, and limited 






 


403644764.2
11 to Saturday and Sunday events between 7 AM and 10 PM with expected attendance up to 250 attendees; clean-up may take place after 10 PM. City shall not permit any attendee, City elected or appointed official or employee, contractor, vendor or any other person present at any of such Special Events to: (i) interfere with or disrupt the business operations or use of the Property by Developer, any of its tenants, or any principal, officer, manager, employee, invitee, vendor or contractor of Developer or any of its tenants, (ii) interfere or tamper with, damage, impair or alter any of the elements or features of the Final Remedial Action Plan approved by the California Department of Toxic Substances Control on July 17, 2022, or (iii) park any vehicle in any of the Property’s parking spaces or in any other area of the Property outside of the Special Event Area as depicted on Exhibit E. The Parties shall enter into an agreement that provides the terms and conditions for providing access to Special Events substantially in the form of Exhibit F attached hereto (the "Access Agreement”), which access shall commence upon issuance of a certificate of occupancy. The terms and conditions of Special Events in this Section 5.5.3 may be modified in writing upon the mutual agreement by City and Developer and the approval of the Director as a Minor Modification pursuant to Section 4.11.1 hereof. City shall provide Developer and each of its tenants a minimum of fourteen (14) calendar days’ notice of its intent to hold a Special Event so that Developer may coordinate with its tenants to make sure that business operations do not interfere with the City’s Special Events. The City shall be responsible for sponsoring, securing, and monitoring Special Events. Security and public services during Special Events shall be the City’s responsibility. This subsection 5.5.3 shall survive termination of this Development Agreement subject to the terms and conditions of the Access Agreement.

5.5.3.1 During the time of the Special Events, truck traffic to the distribution/warehouse use will be rerouted so that trucks will not have access to the eastern and northern portion of the circulation lanes. The City shall be required to install a temporary barrier prohibiting such use and requiring trucks to exit in the direction that they entered.

5.5.3.2 During the time of the Special Events, the City may install temporary physical barriers to prevent vehicles from entering the drive aisles near the Special Events, provided that access is still provided to the parking areas for the self-storage uses.

5.5.3.3 Developer shall construct a 10 foot by 20 foot storage building of 200 square feet for City storage use of all items related to the special events including barricades, tables and chairs at no cost to the City. City shall provide, pay and be solely responsible for all such items, except that Developer shall maintain this storage space in a manner that prevents damage to such items while stored in this storage space. Developer shall bear no responsibility or liability for maintaining, repairing or replacing any such item stored in this storage space. The storage area shall be built in the general location as shown on Exhibit E, shall be slab on grade, built out of CMU, and equipped with a steel door and LED motion sensor lights on the inside.

The building shall be designed to be compatible with the Project. The final plans shall be reviewed and approved by the Director of Community Development. Developer shall be responsible for the long-term maintenance of the storage area. This provision shall survive the term of this Development Agreement and shall be subject to the terms and conditions of the Access Agreement.

6. City Agreements.







 


403644764.2
12 6.1 Expedited Processing. The City shall process for review and approval, at Developer’s expense, in an expedited manner, all applications or requests for plan checking, excavation, grading, building, encroachment and street improvement permits, inspections and Certificates of Occupancy, utility connection authorizations, and other ministerial permits or approvals necessary, convenient or appropriate for the grading, excavation, construction, development, improvement, use and occupancy of the Project. Without limiting the foregoing, if requested by Developer and at Developer’s expense, the City agrees to utilize private plan checkers in addition to those already under contract with the City and any other available means to expedite the processing of Project applications, including concurrent processing of such applications by various City departments.

6.2 Processing Cooperation and Assistance. To the extent permitted by law, the City shall reasonably cooperate with the Developer in securing any and all entitlements, authorizations, permits or approvals which may be required by any other governmental or quasi-governmental entity in connection with the development of the Project or the Property. Without limiting the foregoing, the City shall reasonably cooperate with the Developer in any dealings with federal, state and other local governmental and quasi-governmental entities concerning issues affecting the Property. The City shall keep the Developer fully informed with respect to its communications with such agencies which could impact the development of the Property. The City must not take any actions to encourage any other governmental or quasi-governmental entities from withholding any necessary approvals and any such contrary actions on the part of the City must be considered a breach of this Agreement by City.

6.3 Processing During Third-Party Litigation. The filing of any third-party lawsuit(s) against the City or the Developer relating to this Agreement, the Project Approvals, any Future Approvals or to other development issues affecting any portion of the Property or the Project shall not hinder, delay or stop the development, processing or construction of the Project, approval of the Future Approvals, or issuance of ministerial permits or approvals, unless the third party obtains a court order restraining the activity. The City shall not stipulate to or cooperate in the issuance of any such order.

6.4 Performance of Director Duties. The City shall ensure that a person or persons are designated at all times to carry out the duties of the Director set forth in this Agreement.

6.5 No Amendment to Specific Plan. The City shall not initiate any amendment to the Specific Plan during the Term of this Agreement without the Developer or its successor’s written agreement and consent.

7. Modification/Suspension.

7.1 Pursuant to Government Code Section 65869.5, in the event that any state or federal law or regulation, enacted after the Effective Date, precludes compliance with any provision of this Agreement, such provision shall be deemed modified or suspended to the extent practicable to comply with such state or federal law or regulation, as reasonably determined necessary by City.

Upon repeal of said law or regulation or the occurrence of any other event removing the effect 






 


403644764.2
13 thereof upon the Agreement, the provisions hereof shall be restored to their full original effect.

7.2 In the event any state or federal resources agency ( such as California Department of Fish and Game, U.S. Fish and Wildlife Service, U.S. Army Corps of Engineers, Regional Water Quality Control Board/State Water Resources Control Board or other agencies), in connection with its final issuance of a permit or certification for all or a portion of the Project, imposes requirements (“Permitting Requirements”) that require modifications to the Project, then the Parties will work together in good faith to incorporate such changes into the Project; provided, however, that if Developer appeals or challenges any such Permit Requirements, then the Parties may defer such changes until the completion of such appeal or challenge.

8. Demonstration of Good Faith Compliance.

8.1 Review of Compliance. In accordance with Government Code Section 65865.1, this Section 8 and the Applicable Rules, once each year, on or before each anniversary of the Effective Date (“Periodic Review”), the Director shall review the extent of the Developer’s good faith substantial compliance with the terms and provisions of this Agreement, as well as the performance by the City of its obligations under this Agreement.

8.2 Good Faith Compliance. During each Periodic Review, the Developer shall demonstrate by written status report that, during the preceding twelve-month (12-month) period (“Review Period”), that it has been in good faith compliance with this Agreement. For purposes of this Agreement, the phrase “good faith compliance” shall mean that the Developer has demonstrated that it has acted in a commercially reasonable manner (taking into account the circumstances which then exist) and in good faith in and has substantially complied with the Developer’s material obligations under this Agreement.

8.3 City Report - Information to be Provided to Developer. At least fourteen (14) days before each annual anniversary of the Effective Date, the City shall deliver to the Developer a copy of all staff reports prepared in connection with a Periodic Review, any prior staff reports generated during the Review Period, written comments from the public, and, to the extent practical, all related exhibits concerning such Periodic Review. This information shall be known as the “City Report.”

8.4 Developer’s Report. No later than the annual anniversary of the Effective Date, Developer must submit a written status report to the Director addressing the good faith compliance issue set forth in Section 8.2 above and any issues raised by the City Report provided to the Developer in accordance with Section 8.3 above.

8.5 Notice of Non-Compliance; Cure Rights. If, after reviewing the Developer’s Report, the Director reasonably concludes, on the basis of substantial evidence, that as to any parcel or parcels comprising the Property, Developer has not demonstrated that it is in good faith compliance with this Agreement, the Director may issue and deliver to the Developer a written Notice of Violation as set forth in Section 10 below.

8.6 Public Notice of Finding. Any appeal of the Director’s determination pursuant to 






 


403644764.2
14 Section 8.5 (including any appeal by the Developer) must be filed within thirty (30) days following such decision. Filing such an appeal tolls the cure period specified in the Notice of Violation.

Notwithstanding Section 13.1, an appeal regarding the Notice of Violation shall be heard directly by the City Council at a duly-noticed public hearing and the City Council must issue a final decision. Developer retains the right to challenge the City’s issuance of any final decision pursuant to Code of Civil Procedure § 1094.5 without complying with the procedures set forth in Section

10.4 below.

8.7 Failure of Periodic Review. The City’s failure to review, at least annually, compliance by the Developer with the terms and conditions of this Agreement shall not constitute or be asserted by any Party as a breach by any other Party of this Agreement. If the City fails to provide the City Report by fourteen (14) days before each annual anniversary of the Effective Date, Developer will be deemed to be in good faith compliance with this Agreement for that Review Period.

9. Excusable Delays. Performance by any Party of its obligations hereunder shall be excused during any period of “Excusable Delay,” as hereinafter defined, provided that the Party claiming the delay gives notice of the delay to the other Party as soon as reasonably possible after the same has been ascertained. For purposes hereof, Excusable Delay shall mean delay that directly affects, and is beyond the reasonable control of, the Party claiming the delay, including, without limitation:
(i) act of God; (ii) civil commotion; (iii) riot; (iv) strike, picketing or other labor dispute; (v) shortage of materials or supplies; (vi) damage to work in progress by reason of fire, flood, earthquake or other casualty; (vii) reasonably unforeseeable delay caused by a reasonably unforeseeable restriction imposed or mandated by a governmental entity; (viii) litigation brought by a third-party attacking the validity of this Agreement, a Project Approval, a Future Approval or any other action necessary for development of the Property; (ix) delays caused by any breach or default by City or the Developer hereunder; (x) delays due to a pandemic and/or government mandated quarantine; or (xi) delays due to the presence or remediation of hazardous materials.

The Term of this Agreement, including any extensions, shall be extended by any period of Excusable Delay.

10. Default Provisions.

10.1 Default. Either Party to this Agreement shall be deemed to be in “Default” under this Agreement if it materially breaches any of the provisions of this Agreement and the same is not cured within the time set forth in a written notice of violation (the “Notice of Violation”) from the non-breaching Party to the breaching Party, which period of time shall not be less than twenty (20) days for monetary breaches, and not less than sixty (60) days for non-monetary breaches from the date that the notice is deemed received, provided if the breaching Party cannot reasonably cure a non-monetary breach within the time set forth in the notice, then the breaching Party shall not be in Default if it commences to cure the breach within such time limit and diligently effects such cure thereafter. If the City determines that a Default by Developer may have occurred, the City shall give written notice to the Developer of its intention to terminate this Agreement and comply with the notice and public hearing requirements of Government Code Sections 65867 and 65868.

At the time and place set for the hearing on termination, the Developer shall be given an 






 


403644764.2
15 opportunity to be heard. If the City Council finds, based upon the evidence, that the Developer is in Default under this Agreement, the City Council may modify or terminate this Agreement. If Developer initiates a resolution of dispute in accordance with the provisions of Section 10.4 below within sixty (60) days following the City Council’s determination that Developer is in Default under this Agreement, the City Council’s decision to modify or terminate this Agreement is stayed until the issue has been resolved through informal procedures, mediation, or court proceedings.

10.2 Content of Notice of Violation. Every Notice of Violation shall state with specificity that it is given pursuant to this Section of the Agreement, the nature of the alleged breach (including references to the pertinent provisions of this Agreement), the portion of the Property involved, and the manner in which the breach may be satisfactorily cured. The notice shall be deemed given in accordance with Section 19 hereof.

10.3 Remedies for Default. The Parties agree that upon a default by a Party the other Party shall have all rights and remedies provided herein or by applicable law, which shall include but not be limited to compelling the specific performance of the defaulting Party’s obligations under this Agreement, provided that the non-defaulting Party complies with the Notice of Violation requirements in Sections 10.1 and 10.2 hereof. No modification or termination of this Agreement pursuant to Section 10.1 hereof shall invalidate or affect in any manner any of the other Project Approvals.

10.4 Resolution of Disputes. The City and the Developer agree to attempt to settle any claim, dispute or controversy arising from this Agreement through consultation and negotiation in good faith and in spirit of mutual cooperation. If those attempts fail, the dispute may be mediated by a mediator chosen jointly by the City and the Developer within thirty (30) days after notice by one of the parties demanding non-binding mediation. Neither Party may unreasonably withhold consent to the selection of a mediator. The City and the Developer will share the cost of the mediation equally. The Parties may agree to engage in some other form of non-binding alternate dispute resolution (“ADR”) procedure in lieu of mediation. Any dispute that cannot be resolved between the Parties through negotiation or mediation within two (2) months after the date of the initial demand for non-binding mediation may then be submitted to a court of competent jurisdiction in the County of Los Angeles, California.

10.5 Attorney’s Fees and Costs. Each Party to this Agreement agrees to waive any entitlement of attorney’s fees and costs incurred with respect to any dispute arising from this Agreement. The parties will each bear their own attorney’s fees and costs in the event of any dispute.

11. Mortgagee Protection. This Agreement shall not prevent or limit the Developer, in any manner, at Developer’s sole discretion, from encumbering the Property or any portion thereof or any improvements thereon by any mortgage, deed of trust or other security device. The City acknowledges that the lender(s) providing such financing (“Mortgagee”) may require certain Agreement interpretations and agrees, upon request, from time to time, to meet with the Developer and representatives of such lender(s) to provide within a reasonable time period the City’s response to such requested interpretations. The City will not unreasonably withhold its consent to any such 






 


403644764.2
16 requested interpretation, provided that such interpretation is consistent with the intent and purposes of this Agreement. Any Mortgagee of a mortgage or a beneficiary of a deed of trust or any successor or assign thereof, including, without limitation, the purchaser at a judicial or non-judicial foreclosure sale, or a person or entity who obtains title by deed-in-lieu of foreclosure on the Property shall be entitled to the following rights and privileges:

11.1 Mortgage Not Rendered Invalid. Neither entering into this Agreement nor a breach of or Default under this Agreement shall defeat, render invalid, diminish, or impair the priority of the lien of any mortgage or deed of trust on the Property made in good faith and for value. No Mortgagee shall have an obligation or duty under this Agreement to perform the Developer’s obligations, or to guarantee such performance, prior to Mortgagee taking title to all or a portion of the Property.

11.2 Request for Notice to Mortgagee. The Mortgagee of any mortgage or deed of trust encumbering the Property, or any part thereof, who has submitted a request in writing to the City in the manner specified herein for giving notices, shall be entitled to receive a copy of any Notice of Violation delivered to the Developer.

11.3 Mortgagee’s Time to Cure. The City shall provide a copy of any Notice of Violation to the Mortgagee that has requested such copy within ten (10) days of sending the Notice of Violation to the Developer. The Mortgagee shall have the right, but not the obligation, to cure the specified breach for a period of sixty (60) days after receipt of such Notice of Violation, or such longer period of time as may be specified in the Notice. Notwithstanding the foregoing, if such breach shall be a breach which can only be remedied by such Mortgagee obtaining possession of the Property, or any portion thereof, and such Mortgagee seeks to obtain possession, such Mortgagee shall have until sixty (60) days after the date of obtaining such possession to cure or, if such breach cannot reasonably be cured within such period, to commence to cure such breach, provided that such breach is cured no later than one (1) year after Mortgagee obtains such possession of the Property.

11.4 Cure Rights. Any Mortgagee who takes title to all of the Property, or any part thereof, pursuant to foreclosure of the mortgage or deed of trust, or a deed in lieu of foreclosure, shall succeed to the rights and obligations of the Developer under this Agreement as to the Property or portion thereof so acquired; provided, however, in no event shall such Mortgagee be liable for any breaches, Defaults, or monetary obligations of the Developer arising prior to acquisition of title to the Property by such Mortgagee, except that any such Mortgagee shall not be entitled to a new building permit or new occupancy certificate until all delinquent and current fees and other monetary or non-monetary obligations due under this Agreement for the Property, or portion thereof acquired by such Mortgagee, have been satisfied.

11.5 Bankruptcy. If any Mortgagee is prohibited from commencing or prosecuting foreclosure or other appropriate proceedings in the nature of foreclosure by any process or injunction issued by any court or by reason of any action by any court having jurisdiction of any bankruptcy or insolvency proceedings involving the Developer, the times specified in Section 10 above shall be extended for the period of the prohibition, except that any such extension shall not 






 


403644764.2
17 extend the Term of this Agreement.

11.6 Disaffirmation. If this Agreement is terminated as to any portion of the Property by reason of (i) any Default, or (ii) as a result of a bankruptcy proceeding, and this Agreement is disaffirmed by a receiver, liquidator, or trustee for the Developer or its property, the City, if requested by any Mortgagee, shall negotiate in good faith with such Mortgagee for a new development agreement for the Project as to such portion of the Property with the most senior Mortgagee requesting such new agreement. This Agreement does not require any Mortgagee or the City to enter into a new development agreement pursuant to this Section.

12. Estoppel Certificate. At any time and from time to time, the Developer may deliver written notice to City and City may deliver written notice to the Developer requesting that such Party certify in writing that, to the knowledge of the certifying Party: (i) this Agreement is in full force and effect and a binding obligation of the Parties; (ii) this Agreement has not been amended, or if amended, the identity of each amendment; and (iii) the requesting Party is not in breach of this Agreement, or if in breach, a description of each such breach. The Party receiving such a request shall execute and return the certificate within thirty (30) days following receipt of the notice. The failure of the City to deliver such a written notice within such time shall constitute a conclusive presumption against the City that, except as may be represented by the Developer, this Agreement is in full force and effect without modification, and that there are no uncured breaches or Defaults in the performance of the Developer. The Director shall be authorized to execute, on behalf of the City, any Estoppel Certificate requested by the Developer. City acknowledges that a certificate may be relied upon by successors in interest to the Developer who requested the certificate and by holders of record of deeds of trust on the portion of the Property in which that Developer has a legal interest.

13. Administration of Agreement.

13.1 Appeal of Staff Determinations. Any decision by City staff concerning the interpretation or administration of this Agreement or development of the Property in accordance herewith may be appealed by the Developer to the Planning Commission, and thereafter, if necessary, to the City Council pursuant to the Gardena Municipal Code. The Developer shall not seek judicial review of any staff decision without first having exhausted its remedies pursuant to this Section. Final determinations by the City Council are subject to judicial review subject to the restrictions and limitations of California law.

13.2 Operating Memoranda. The provisions of this Agreement require a close degree of cooperation between City and Developer. During the Term of this Agreement, clarifications to this Agreement and the Applicable Rules may be appropriate with respect to the details of performance of City and Developer. If and when, from time to time, during the term of this Agreement, City and Developer agree that such clarifications are necessary or appropriate, they shall effectuate such clarification through a memorandum approved in writing by City and Developer (the “Operating Memoranda”), which, after execution, shall be attached hereto and become part of this Agreement and the same may be further clarified from time to time as necessary with future written approval by City and the Developer. Operating Memoranda are not 






 


403644764.2
18 intended to and shall not constitute an amendment to this Agreement but are mere ministerial clarifications, therefore, public notices and hearings are not required. The City Attorney shall be authorized, upon consultation with, and approval of, the Developer, to determine whether a requested clarification may be effectuated pursuant to this Section or whether the requested clarification is of such character to constitute an amendment hereof which requires compliance with the provisions of Section 14 below. The authority to enter into such Operating Memoranda is hereby delegated to the Director, and the Director is hereby authorized to execute any Operating Memoranda hereunder without further City Council action. A minor change to the Specific Plan as set forth in Section 8.6 thereof does not require an amendment to this Agreement.

13.3 Certificate of Performance. Upon the completion of the Project, or the completion of development of any parcel within the Project, or upon completion of performance of this Agreement or its earlier revocation and termination, the City shall provide the Developer, upon the Developer’s request, with a statement (“Certificate of Performance”) evidencing said completion or revocation and the release of the Developer from further obligations hereunder, except for any ongoing obligations hereunder. The Certificate of Performance shall be signed by the appropriate agents of the Developer and the City and shall be recorded in the official records of Los Angeles County, California. Such Certificate of Performance is not a notice of completion as referred to in California Civil Code § 3093.

14. Amendment or Termination by Mutual Consent. Except as otherwise set forth herein, this Agreement may only be amended or terminated, in whole or in part, by mutual written consent of City and the Developer, and upon compliance with the provisions of Government Code § 65867.

15. Indemnification/Defense.

15.1 Indemnification. The Developer agrees to indemnify and hold the City harmless from and against any claim, action, damages, costs (including, without limitation, attorney’s fees), injuries, or liability, arising from the City’s approval of the Project, this Agreement, Developer’s performance of this Agreement, and all procedures with approving this Agreement (collectively, “Discretionary Approvals”), except to the extent such is a result of: (i) any claims arising from or in connection with Special Events that are not due to Developer’s sole negligence or intentional misconduct, or (ii) the City’s sole negligence or intentional misconduct. Should the City be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of the Discretionary Approvals, Developer agrees to defend the City (at the City’s request and with counsel satisfactory to the City) and will indemnify the City for any judgment rendered against it or any sums paid out in settlement or otherwise, except to the extent such action is a result of the City’s sole negligence or intentional misconduct. For purposes of this Section, “the City” includes the City of Gardena’s elected officials, appointed officials, officers, consultants, and employees.

15.2 Defense of Agreement. If the City accepts Developer’s indemnification and defense as provided in Section 15.1 above, the City agrees to and shall timely take all actions which are necessary or required to uphold the validity and enforceability of this Agreement, the Discretionary Approvals, Project Approvals, Development Standards, and the Applicable Rules. 






 


403644764.2
19 16. Cooperation in the Event of Legal Challenge.

16.1 Third-Party Challenges. In the event of any administrative, legal, or equitable action or other proceeding instituted by any person or entity not a party to the Agreement challenging the validity of any provision of this Agreement, challenging any Approval, or challenging the sufficiency of any environmental review of either this Agreement or any Approval under CEQA (each a “Third-Party Challenge”), each party must cooperate in the defense of such Third-Party Challenge, in accordance with this Section. Developer agrees to pay City’s costs of defending a Third-Party Challenge, including all court costs and reasonable attorney’s fees expended by City (including the time and cost of the City Attorney so long as the City Attorney is not an employee of the City) in defense of any Third-Party Challenge. Developer may select its own legal counsel to represent Developer’s interests in any Third-Party Challenge at Developer’s sole cost and expense. City agrees that it will not enter into a settlement agreement to any ThirdParty Challenge without Developer’s written consent. Developer’s obligation to pay City’s costs in the defense of a Third-Party Challenge shall not extend to those costs incurred on appeal, if Developer notifies the City is writing that it does not wish to pursue the appeal.

16.2 Third-Party Challenges Related to the Applicability of City Laws. The provisions of this Section will apply only in the event of a legal or equitable action or other proceeding, before a court of competent jurisdiction, instituted by any person or entity not a party to the Agreement challenging the applicability to the Project or Property of a conflicting City Law (a “Third-Party Enforcement Action”):

16.2.1 In the event of a Third-Party Enforcement Action, City must: (i) promptly notify Developer of such action or proceeding; and (ii) stipulate to Developer’s intervention as a party to such action or proceeding unless Developer has already been named as a respondent or real party in interest to such action or proceeding. In no event will City take any action that would frustrate, hinder, or otherwise complicate Developer’s efforts to intervene, join or otherwise participate as a party to any Third-Party Enforcement Action. As requested by Developer, City must use its best efforts to ensure that Developer is permitted to intervene, join or otherwise participate as a party to any Third-Party Enforcement Action. If, for any reason, Developer is not permitted to intervene, join or otherwise participate as a party to any Third-Party Enforcement Action, the parties to this Agreement agree to cooperate, to the maximum extent permitted by law, in the defense of such action or proceeding. For purposes of this Section, the required cooperation between the parties includes, without limitation, developing litigation strategies, preparing litigation briefs and other related documents, conferring on all aspects of the litigation, developing settlement strategies, and, to the extent permitted by law, jointly making significant decisions related to the relevant litigation, throughout the course thereof.

16.2.2 City’s costs of defending any Third-Party Enforcement Action, including all court costs, and reasonable attorney’s fees expended by City (including the time and cost of the City Attorney so long as the City Attorney is not an employee of the City) in defense of any ThirdParty Enforcement Action (the “Enforcement Action Defense Costs”), will be paid in accordance with this Agreement. The Enforcement Action Defense Costs shall extend to, and Developer will be obligated to pay, any costs incurred on appeal unless Developer notifies the City in writing that 






 


403644764.2
20 it does not wish to pursue the appeal.

16.2.3 City must not enter into a settlement agreement or take any other action to resolve any Third Party Enforcement Action without Developer’s written consent. City cannot, without Developer’s written consent, take any action that would frustrate, hinder or otherwise prevent Developer’s efforts to settle or otherwise resolve any Third-Party Enforcement Action.

16.2.4 Provided that City complies with this Section and provided that Developer is a party to the relevant Third-Party Enforcement Action, Developer agrees to be bound by any final judgment (i.e., following all available appeals) arising out of a Third-Party Enforcement Action and further agrees that no default under this Agreement will arise if such final judgment requires City to apply to the Project or Project Site a City Law that conflicts with Applicable Law or this Agreement.

17. Time of Essence. Time is of the essence for each provision of this Agreement of which time is an element.

18. Effective Date. This Agreement shall become operative on the date the Enabling Ordinance approving this Development Agreement becomes effective (the “Effective Date”) pursuant to Government Code Section 36937.

19. Notices. Any notice that a party is required or may desire to give the other must be in writing and may be sent by: i) personal delivery; or ii) by deposit in the United States mail, postage paid, registered or certified mail, return receipt requested; or iii) by overnight delivery using a nationally recognized overnight courier, providing proof of delivery; or iv) by facsimile, evidenced by confirmed receipt; or v) by electronic delivery, evidenced by confirmed receipt, addressed as follows:

If to City: City of Gardena
1700 W. 162nd Street
Gardena, CA 90247
Attention: City Manager
Phone: 310-217-9503
E-mail: [email protected]
With a Copy to: City of Gardena
1700 W. 162nd Street
Gardena, CA 90247
Attention: Community Development Director
Phone: 310-217-9546
E-mail: [email protected]
With a Copy to: City Attorney’s Office
1700 W. 162nd Street
Gardena, CA 90247







 


403644764.2
21 Attention: Carmen Vasquez and Lisa Kranitz
Phone: 310-217-9503
E-mail: [email protected]
[email protected]
If to Developer: 1450 Artesia Acquisition Company LLC
2015 Manhattan Beach Boulevard, Suite 104
Redondo Beach, CA 90278
Attention: Charles Brown
Telephone: (704) 430-7037
E-mail: [email protected]
With a Copy to: Fernando Villa
Manatt Phelps & Phillips, LLP
2049 Century Park East, Suite 1700
Los Angeles, CA 90067
Phone: 310-312-4389
E-mail: [email protected]
Either City or Developer may change its mailing address at any time by giving written notice of such change to the other in the manner provided herein at least ten days prior to the date such change is affected. Any notice given by mail is deemed to have been given as of the date of delivery (whether accepted or refused) established by the United State Post Office, return receipt, or the overnight carrier’s proof of delivery as the case may be. Notices given in any other manner are effective only if and when received by the party to be notified between the hours of 8:00 a.m. and 5:00 p.m., local time of the recipient, of any business day with delivery made after such hours deemed received the following business day.

20. Entire Agreement. This Agreement contains the entire agreement between the Parties regarding the subject matter hereof, and supersedes in its entirety all prior agreements or understandings, oral or written. This Agreement shall not be amended, except as expressly provided herein.

21. Waiver. No waiver of any provision of this Agreement shall constitute a waiver of any other provision, whether or not similar; nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless it is executed in writing by a duly authorized representative of the Party against whom enforcement of the waiver is sought.

22. Supersession of Subsequent Laws of Judicial Action. The provisions of this Agreement must, to the extent feasible, be modified or suspended as may be necessary to comply with any new State or federal law or decision issued by a court of competent jurisdiction, enacted or made after the effective date which prevents or precludes compliance with one or more provisions of 






 


403644764.2
22 this Agreement. Immediately after enactment of any such new law, or issuance of such decision, the parties must meet and confer in good faith to determine the feasibility of any such modification or suspension based on the effect such modification or suspension would have on the purposes and intent of this Agreement.

23. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be invalid or unenforceable, the remainder of this Agreement shall be effective to the extent the remaining provisions are not rendered impractical to perform, taking into consideration the purposes of this Agreement.

24. Relationship of the Parties. Each Party acknowledges that, in entering into and performing under this Agreement, it is acting as an independent entity and not as an agent of any other Party in any respect. Nothing contained herein or in any document executed in connection herewith shall be construed as creating the relationship of partners, joint ventures or any other association of any king or nature between City and Developer, jointly or severally.

25. No Third-Party Beneficiaries. This Agreement is made and entered into for the sole benefit of the Parties and their successors in interest. No other person or party shall have any right of action based upon any provision of this Agreement.

26. Recordation of Agreement and Amendments. This Agreement and any amendment thereof shall be recorded with the County Recorder of the County of Los Angeles by the City Clerk of City.

27. Cooperation Between City and Developer. City and Developer shall execute and deliver to the other all such other and further instruments and documents as may be reasonably necessary to carry out the purposes of this Agreement. Upon satisfactory performance by Developer, and subject to the continuing cooperation of the Developer, City will commence and in a timely manner proceed to complete all steps necessary for the implementation of this Agreement and development of the Project or Property in accordance with the terms of this Agreement.

28. Rules of Construction. The captions and headings of the various sections and subsections of this Agreement are for convenience of reference only, and they shall not constitute a part of this Agreement for any other purpose or affect interpretation of the Agreement. Should any provision of this Agreement be found to be in conflict with any provision of the Applicable Rules or the Project Approvals or the Future Approvals, the provisions of this Agreement shall control.

29. Joint Preparation. This Agreement shall be deemed to have been prepared jointly and equally by the Parties, and it shall not be construed against any Party on the ground that the Party prepared the Agreement or caused it to be prepared.

30. Governing Law and Venue. This Agreement is made, entered into, and executed in the County of Los Angeles, California, and the laws of the State of California shall govern its interpretation and enforcement. Any action, suit or proceeding related to, or arising from, this Agreement shall be filed in the appropriate court having jurisdiction in the County of Los Angeles. 






 


403644764.2
23 31. Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be deemed an original, but all of which constitute one and the same instrument.

32. Weekend/Holiday Dates. Whenever any determination is to be made or action to be taken on a date specified in this Agreement, if such date shall fall upon a Saturday, Sunday or holiday specified in Government Code § 6700, the date for such determination or action shall be extended to the first business day immediately thereafter.

33. Not a Public Dedication. Except as otherwise expressly provided herein, nothing herein contained shall be deemed to be a gift or dedication of the Property, or of the Project, or any portion thereof, to the general public, for the general public, or for any public use or purpose whatsoever, it being the intention and understanding of the Parties that this Agreement be strictly limited to and for the purposes herein expressed for the development of the Project as private property. The Developer shall have the right to prevent or prohibit the use of the Property, or the Project, or any portion thereof, including common areas and buildings and improvements located thereon, by any person for any purpose which is not consistent with the development of the Project. Any portion of the Property conveyed to the City by the Developer as provided herein shall be held and used by the City only for the purposes contemplated herein or otherwise provided in such conveyance, and the City shall not take or permit to be taken (if within the power or authority of the City) any action or activity with respect to such portion of the Property that would deprive the Developer of the material benefits of this Agreement, or would in any manner interfere with the development of the Project as contemplated by this Agreement.

34. Releases. City agrees that upon written request of Developer and payment of all fees and performance of the requirements and conditions required by Developer by this Agreement, the City must promptly execute and deliver to Developer appropriate release(s) of further obligations imposed by this Agreement in form and substance acceptable to the Los Angeles County Recorder’s Office or as otherwise may be necessary to affect the release.

35. Consent. Where the consent or approval of City or Developer is required or necessary under this Agreement, the consent or approval will not be unreasonably withheld, delayed or conditioned.







 


403644764.2
24 IN WITNESS WHEREOF, the Developer and the City of Gardena have executed this Development Agreement on the date first above written.

CITY:

City of Gardena, a municipal corporation
By: ________________________________
Tasha Cerda, Mayor
ATTEST:
________________________________
Mina Semenza, City Clerk
APPROVED AS TO FORM:

By:______________________________
Carmen Vasquez, City Attorney
DEVELOPER:
1450 Artesia Acquisition Company LLC
By:__________________________
Charles Brown







 


403644764.2
A-1

EXHIBIT A

LEGAL DESCRIPTION







 


403644764.2

EXHIBIT B

SITE PLAN








 


C-1

EXHIBIT C

ASSIGNMENT AND ASSUMPTION AGREEMENT
Recording Requested By and
When Recorded Mail To:

ASSIGNMENT AND ASSUMPTION AGREEMENT
This ASSIGNMENT AND ASSUMPTION AGREEMENT (“Agreement”) is made and entered into by and among 1450 ARTESIA ACQUISITION COMPANY LLC, a Delaware Limited Liability Corporation (“Assignor”), and, __________________________, a ____________________________ (“Assignee”).

R E C I T A L S
A. The City of Gardena (“City”) and Assignor entered into that certain Revised and Restated Development Agreement dated __________, 20__ (the “Development Agreement”), with respect to the real property located in the City of Gardena, State of California more particularly described in Exhibit “A” attached hereto (the “Project Site”), and B. Assignor has obtained from the City certain development approvals and permits with respect to the development of the Project Site, including without limitation, approval of ____________________________ for the Project Site (collectively, the “Project Approvals”).

C. Assignor intends to sell, and Assignee intends to purchase, that portion of the Project Site more particularly described in Exhibit “B” attached hereto (the “Transferred Property”).

D. In connection with such purchase and sale, Assignor desires to transfer all of the Assignor’s right, title, and interest in and to the Development Agreement and the Project Approvals with respect to the Transferred Property. Assignee desires to accept such assignment from Assignor and assume the obligations of Assignor under the Development Agreement and the Project Approvals with respect to the Transferred Property.








 


C-2
THEREFORE, the parties agree as follows:

1. Assignment. Assignor hereby assigns and transfers to Assignee all of Assignor’s right, title, and interest in and to the Development Agreement and the Project Approvals with respect to the Transferred Property. Assignee hereby accepts such assignment from Assignor.

2. Assumption. Assignee expressly assumes and agrees to keep, perform, and fulfill all the terms, conditions, covenants, and obligations required to be kept, performed, and fulfilled by Assignor under the Development Agreement and the Project Approvals with respect to the Transferred Property, including but not limited to those obligations specifically allocated to the Transferred Parcel as set forth on Exhibit “C” attached hereto.

3. Effective Date. The execution by City of the attached receipt for this Agreement shall be considered as conclusive proof of delivery of this Agreement and of the assignment and assumption contained herein. This Agreement shall be effective upon its recordation in the Official Records of Los Angeles County, California, provided that Assignee has closed the purchase and sale transaction and acquired legal title to the Transferred Property.

4. Remainder of Project. Any and all rights or obligations pertaining to such portion of the Project Site other than the Transferred Property are expressly excluded from the assignment and assumption provided in Sections 1 and 2 above.

IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the dates set forth next to their signatures below.
“ASSIGNOR”
1450 ARTESIA ACQUISITION COMPANY
LLC
_____________________________________
“ASSIGNEE”
[____________________]
_____________________________________








 


C-3

RECEIPT BY CITY
The attached ASSIGNMENT AND ASSUMPTION AGREEMENT is received by the City of Gardena on this ___ day of ______________________, _________________.

CITY OF GARDENA
______________________________________
By: __________________________________
Community Development Director

[EXHIBITS “A” THROUGH “C” TO BE ADDED AT EXECUTION]








 


C-4

EXHIBIT D

LOCAL HIRING/LOCAL BUYING PROGRAM FOR CONSTRUCTION
Local Hiring Policy for Construction. Developer shall implement a local hiring policy (the “Local Hiring Policy”) for construction of the Project, consistent with the following guidelines:

1. Purpose. The purpose of the Local Hiring Policy is to facilitate the employment by Developer and its contractors at the Project of residents of the City of Gardena (the “Targeted Job Applicants”), and in particular, those residents who are “Low-Income Individuals” (defined below) by ensuring Targeted Job Applicants are aware of Project construction employment opportunities and have a fair opportunity to apply and compete for such jobs.

2. Definitions.
a. “Contract” means a contract or other agreement for the providing of any combination of labor, materials, supplies, and equipment to the construction of the Project that will result in On-Site Jobs, directly or indirectly, either pursuant to the terms of such contract or other agreement or through one or more subcontracts. b. “Contractor” means a prime contractor, a sub-contractor, or any other entity that enters into a Contract with Developer for any portion or component of the work necessary to construct the Project (excluding architectural, design and other “soft” components of the construction of the Project).
c. “Low Income Individual” means a resident of the City of Gardena whose household income is no greater than 80% of the Median Income.
d. “Median Income means the median family income published from time to time by HUD for the Los Angeles-Long Beach Metropolitan Statistical Area. e. “On-Site Jobs” means all jobs by a Contractor under a Contract for which at least fifty percent (50%) of the work hours for such job requires the employee to be at the Project site, regardless of whether such job is in the nature of an employee or an independent contractor. On-Site Jobs shall not include jobs at the Project site which will be performed by the Contractor’s established work crew who have not been hired specifically to work at the Project site.

3. Priority for Targeted Job Applicants. Subject to Section 6 below in this Local Hiring Policy provides that the Targeted Job Applicants shall be considered for each On-Site Job in the following order of priority:
a. First Priority: Any resident of a household with no greater than 80% Median Income that resides within the Low and Moderate Income Areas identified in the City of Gardena’s Housing Element;







 


C-5
b. Second Priority: Any resident of a household with no greater than 80% Median Income that resides within the City; and
c. Third Priority: Any resident of a household with no greater than 80% Median Income that resides within a five (5) mile radius of the project site. d. Fourth Priority: Any resident of a household that resides within the City or a five (5) mile radius of the project site.

4. Coverage. The Local Hiring Policy shall apply to all hiring for On-Site Jobs related to the construction of the Project, by Developer and its Contractors.

5. Outreach. So that Targeted Job Applicants are made aware of the availability of On-Site Jobs, Developer or its Contractors shall:
a. Advertise available On-Site Jobs in the Gardena Valley News or similar local media and electronically on a City-sponsored website, if such a resource exists; and b. Work with the South Bay Workforce Investment Board to coordinate recruiting and hiring of workers needed for development and operations of the project.

6. Hiring. Developer and its contractor(s) shall consider in good faith all applications submitted by Targeted Job Applicants for On-Site Jobs, in accordance with their normal practice to hire the most qualified candidate for each position and shall use best efforts to hire Targeted Job Applicants when most qualified or equally qualified as other applicants.

City acknowledges that the Contractors shall determine in their respective subjective business judgment whether any particular Targeted Job Applicant is qualified to perform the On-Site Job for which such Targeted Job Applicant has applied. Contactors are not precluded from advertising regionally or nationally for employees in addition to its local outreach efforts.

7. Term. The Local Hiring Policy shall continue to apply to the construction of the Project until the final certificate of occupancy for the Project has been issued by City.

8. Developer and its contractor(s) shall abide by all applicable State and local labor regulations.

Local Buying Program for Materials and Supplies.

1. Local Supplier Requirements. Developer and its contractors shall use best efforts to ensure that materials and supplies used for construction of the project come from businesses based in the City of Gardena whenever possible.
a. Developer and its contractors shall coordinate with the City’s Economic Development Manager to obtain a list of suppliers in the City. 






 


C-6
b. Developer and its contractors shall solicit bids from suppliers located in the City, but nothing shall require Developer and its contractors to purchase from such supplier if it is not the lowest bid.

2. Local Supplier Report. Developer shall prepare a quarterly report for the City’s Economic Development Manager which shall quantify in dollar amount the materials and supplies procured from businesses based in the City of Gardena and the amount of material and supplies procured elsewhere. The report shall include a description of efforts made to procure materials and supplies from Gardena businesses.








 


C-7

EXHIBIT E

CITY EVENT SPACE








 



CITY EVENT SPACE
C-8

EXHIBIT F

ACCESS AGREEMENT BETWEEN THE CITY AND DEVELOPER







 


403637706.4

RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:

CITY CLERK

CITY OF GARDENA
1700 W. 162nd Street
Gardena, California 90247
Space Above Reserved for Recorder’s Use
EXEMPT FROM RECORDER’S FEES
Pursuant to Government Code § 6103

ACCESS AGREEMENT
This access agreement (this “Agreement”) is entered into between the CITY OF GARDENA (“City”) and 1450 ARTESIA ACQUISITION COMPANY LLC (“Owner”). Owner owns the property identified in Exhibit A attached hereto (the “Property”). City and Owner are referred to individually as “Party” and collectively as the “Parties.” This Agreement is with respect to the property covered by the Artesia Corridor Specific Plan as more particularly described in Exhibit A, attached hereto.

Section 1. Grant of Access and Storage Building. For good and valuable consideration which the parties hereby acknowledge the receipt and sufficiency thereof, subject to the terms of this Agreement, Owner hereby agrees to grant City access to and use of an approximately 36,000 square foot portion of the Property, as depicted in Exhibit B attached hereto (the “Special Event Area”) for special events (“Special Events”) to be held approximately two to three times per a month which shall not exceed 36 times per year, and limited to Saturday and Sunday events between 7 AM and 10 PM with expected attendance up to 250 attendees. Clean-up operations may take place after this time. City shall provide Owner and each of its tenants a minimum of fourteen (14) calendar days’ notice of City’s intent to hold a Special Event, so that Owner may coordinate with its tenants to make sure that business operations do not interfere with the City’s Special Events. City shall be responsible for sponsoring, securing, and monitoring Special Events. Security and public services during Special Events shall be the City’s responsibility.

(a) During the time of the Special Events, truck traffic to the distribution/warehouse uses of the Property will be rerouted so that trucks will not have access to the eastern and northern portion of the circulation lanes. The City shall be required to install a temporary barrier prohibiting such use and requiring trucks to exit in the direction that they entered.
(b) During the time of the Special Events, the City may install temporary physical barriers to prevent vehicles from entering the drive aisles near the Special Events, provided that access is still provided to the parking areas for the self-storage uses of the Property.

(c) Owner shall provide storage space on the Property for City storage use of all items related to the Special Events including barricades, tables and chairs in accordance with the terms of the Development Agreement entered into by the Parties dated March ___, 2025 (the “Development Agreement”). City shall provide, pay and be solely responsible for all such items, except that Owner shall maintain this storage 






 


403637706.4
space in a manner that prevents damage to such items while stored in this storage space. Owner shall bear no responsibility or liability for maintaining, repairing or replacing any such item stored in this storage space.

Section 2. Conditions of and General Limitations on Special Events. Special Events may be conducted only within the Special Event Area and only between the hours of 7:00 a.m. to 10:00 p.m. Pacific Time.

All Special Events shall be undertaken at City’s sole cost and expense. Owner reserves the right, at Owner’s expense, to have its personnel accompany City and any person or entity acting on City’s behalf at all times during its Special Events. City may access the Storage Building at any time.

Section 3. Secure Special Event Area. In connection with any Special Events City shall, and shall cause any person or entity acting on its behalf, to properly secure the Special Event Area to prevent material harm or disruption to Owner or Owner’s tenants, employees, agents, licensees and invitees. City shall, and shall cause any person or entity acting on its behalf, to keep any equipment used or brought onto the Property under its complete control at all times. All such equipment shall be used on the Property at the sole risk of City. Except as provided in Section 1(c) hereof and in the Development Agreement by and among the City and Owner, dated March 11, 2025 (the “Development Agreement”), neither City nor any person or entity acting on City’s behalf may store equipment on the Property when not conducting Special Events without Owner’s written prior consent, which Owner may withhold in its sole and absolute discretion.

Section 4. Compliance with Laws. City shall comply with all applicable federal, state and local laws and regulations in performing the Special Events, including but not limited to any and all applicable federal, state or local statutes, ordinances, regulations, orders, directives or other legal requirements relating to the protection of the environment or to the handling, treatment, storage, or disposal of Hazardous Substances (collectively, “Environmental Laws”). As used in this Agreement, “Hazardous Substances” include any hazardous substances, hazardous material, hazardous waste, regulated substance, or toxic substance, as defined by any Environmental Law, and any chemicals, pollutants, contaminants, petroleum, petroleum products or constituents, petroleum derivatives or metabolites or degradation products, or oil.

Section 5. Duty to Repair and Minimize Disruption. During its Special Events, City shall not permit any attendee, City elected or appointed official or employee, contractor, vendor or any other person present at any of such Special Events to: (i) interfere with or disrupt the business operations or use of the Property by Owner, any of its tenants, or any principal, officer, manager, employee, invitee, vendor or contractor of Owner or any of its tenants other than the truck access as specified in Section 1(a) hereof, (ii) interfere or tamper with, damage, impair or alter any of the elements or features of the Final Remedial Action Plan pertaining to the Property approved by the California Department of Toxic Substances Control on July 17, 2022, or (iii) park any vehicle in any of the Property’s parking spaces or in any other area of the Property outside of the Special Event Area as depicted on Exhibit B. City shall repair any damage to the Property or to the improvements thereon to the condition that existed prior to undertaking such Special Events that may occur as a result of its Special Events at the Property, including but not limited to restoration of the surface areas of the Property, subsurface areas of the Property and any of the Project’s improvements. City shall not install any fixtures on the Property. When not conducting a Special Event, City shall remove any and all of its equipment and materials from the Property, except as otherwise provided in Section 1(c) hereof.

Section 6. Indemnity and Insurance. City shall indemnify, hold harmless and defend Owner and Owner’s principals, officers, employees, investors and lenders (“Owner Indemnitees”) against and from any and all claims, losses, damages, liabilities, judgments, orders, penalties, fines and other losses, including but not limited to reasonable attorneys’ and experts’ fees and expenses, resulting from any claim by any third party 






 


403637706.4
(“Claims”) arising directly or indirectly from (i) any Special Events conducted by City or any person or entity on City’s behalf, (ii) the presence of any Hazardous Substance on or under the Property released, originating from, or caused by City, or (iii) any other entry or activity on the Property by the City or any other person or entity acting on its behalf. The provisions of this Section shall survive the termination of this Agreement.
(a) City shall, and shall require its contractors and subcontractors to, name as additional insureds Owner Indemnitees on City’s and their respective comprehensive general liability policies or their substantial equivalents that shall have per claim and aggregate minimum policy limits of at least One Million Dollars ($1,000,000), and shall provide Owner copies of certificates of insurance under such policies: (i) carried by the City no later than ten (10) days before the date on which the City or any person or entity on City’s behalf first enters the Property, and (ii) carried by each City contractor or subcontractor that will enter and use the Property for any Special Event no later than ten (10) days before the occurrence of any such Special Event. The policies required in this Section 6 shall be in full force and effect whenever City and/or any City contractor or subcontractor enters the Property for any reason. (b) Prior to entry on the Property by City or any person or entity acting on City’s behalf, City shall cause to be furnished to Owner, at no cost to Owner, within the time periods prescribed in Section 6(a) hereof satisfactory certificates of insurance listing the Owner Indemnitees as an additional insureds on the policies listed below (except for Worker’s Compensation, Employer’s Liability and Professional Liability policies), evidencing that City and such persons or entities described in Section 6(a) hereof performing Activities on the Property have insurance in full force and effect whenever City and/or any City contractor or subcontractor enters the Property for any reason meeting the requirements set forth below.

Type Limits
Worker’s Compensation/Employer’s Liability Statutory/$500,000 General Liability $1,000,000/occurrence
$5,000,000/aggregate
Automobile Liability $1,000,000/Combined
Single Limit
(c) The insurance required hereby may be maintained under a blanket policy or an umbrella policy insuring other parties and other locations so long as such policy satisfies the foregoing requirements. Any coverage written on a “claims-made” basis shall be kept in force, either by renewal or the purchase of an extended reporting period, for a minimum period of one year following the first entry onto the Property by City, any City contractor or City subcontractor, or any other person or entity on behalf of City to conduct Activities. Nothing in this Section shall in any way limit City’s liability under this Agreement or otherwise.

Section 7. No Liens. City shall not permit any mechanics’, materialmen’s, or other similar liens or claims to stand against the Property for labor or material furnished in connection with any Special Events performed by City or any person or entity on City’s behalf under this Agreement. Upon reasonable and timely written notice of any such lien or claim delivered to City, City may bond and contest the validity and the amount of such lien, but City shall: (a) promptly pay any judgment rendered; (b) promptly pay all proper costs and charges arising from the Special Events and any disputes relating thereto; and (c) have the 






 


403637706.4
lien or claim released at its sole expense at the earliest practicable time. The provisions of this Section shall survive the termination of this Agreement.

Section 8. No Agency. All Special Events undertaken by or on behalf of City at the Property shall be for its sole account and not as an agent, servant or contractor for Owner.

Section 9. Successors and Assigns and Assignment and Delegation. This Agreement shall be binding upon and inure to the benefit of the parties’ respective successors and assigns, including any tenants of the Property; provided, however, that City may not assign its rights or delegate its duties under this Agreement without the prior written consent of Owner in Owner’s sole and absolute discretion. Owner may assign its rights and/or delegate its duties under this Agreement in Owner’s sole and absolute discretion, provided, however, any such assignment shall require the assignee to assume Owner’s obligations hereunder.

Section 10. Entire Agreement. This Agreement represents the full, complete and entire agreement between the parties with respect to the subject matter hereof. There are no other understandings, oral or written, related to the subject matter of this Agreement.

Section 11. Notices. Any notice required or provided under this Agreement may be made by U.S. mail, express mail by a recognized national express mail service or e-mail addressed to the following persons on behalf of the Parties. Any such notice shall be deemed received by the recipient within three (3) days of the posted date of a letter mailed via U.S. mail, within the date of projected delivery posted by an express mail service, or at the time noted of delivery of an e-mail. Such notices shall be addressed to:

To Owner:
1450 Artesia Acquisition Company LLC
2015 Manhattan Beach Boulevard, Suite 104
Redondo Beach, CA 90278
Attention: Charles Brown
Telephone: (704) 430-7037
[email protected]
To City: City of Gardena
1700 W. 162nd Street
Gardena, CA 90247
Attention: City Manager’s Office
Phone: 310-217-9503
Section 12. Amendment and Integration. This Agreement may be amended only by a written agreement signed by both Parties. No promise, term or condition regarding this Agreement, either express or implied or written or verbal, shall bind or benefit any Party other than the express terms of this Agreement.

Section 13. Governing Law. This Agreement and the rights and obligations hereunder shall be construed in accordance with and be governed by the law of the State of California without regard to conflict of law principles.

Section 14. Remedies and Attorneys’ Fees. Each Party shall have all rights and remedies at law and in equity for a breach of this Agreement by the other Party. If any action or proceeding is brought to enforce the terms of this Agreement, the prevailing party shall be entitled to recover from the other party reasonable attorneys’ fees, costs and expenses in connection with prosecuting or defending such action. 






 


403637706.4
Section 15. No Admission of Liability. It is hereby agreed that the neither this Agreement nor the Special Events on the Property are an admission against City’s or Owner’ interests or an assumption of liability or waiver of any rights by City or Owner.

Section 16. Termination. This Agreement shall survive the termination of the Development Agreement, and shall remain in place until terminated by both parties.

Section 17. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall be deemed an original, but all of which when taken together shall constitute one and the same instrument. The signature page of any counterpart may be detached therefrom without impairing the legal effect of the signature(s) thereon provided such signature page is attached to any other counterpart identical thereto except having additional signature pages executed by other parties to this Agreement attached thereto. Delivery of a signed counterpart by fax or email shall constitute good and sufficient delivery.

In witness hereof, the Parties hereby sign this Agreement as follows:

CITY OF GARDENA
By: ____________________________________________________ Name: __________________________________________________ Title: ___________________________________________________ Date: ___________________________________________________ Contact Person: ___________________________________________ Contact Telephone Number: _________________________________ 1450 ARTESIA ACQUISITION COMPANY LLC
By: _____________________________________________________ Name: ___________________________________________________ Title: ____________________________________________________ Date: ____________________________________________________ Contact Person: ____________________________________________ Contact Telephone Number: __________________________________ 






 


403637706.4
Exhibit A
List of Properties Subject to Access Agreement
The properties subject to this Access Agreement are located at 1450, 1472, 1462, 1452, and 1440 West Artesia Boulevard, Gardena, California, with APNs, respectively, 6106-036-010, -012, -034, 035, -036, and -037.








 


403637706.4
Exhibit B
Special Event Area
[TO BE INSERTED]







 


City of Gardena
Gardena City Council Meeting

AGENDA REPORT SUMMARY
Agenda Item No. 16.A
Section: DEPARTMENTAL

ITEMS - PUBLIC WORKS
Meeting Date: February 25, 2025
TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE: Award Construction Contract for the Rowley Park Improvements Basketball Court Rehab Phase 1 - Demolition, Drainage, Electrical and Site Furnishing Project, JN 530, to Zeco, Inc. in the amount of $588,537.55, Approve the Project Plans & Specifications, 15% Project Contingency, and Declare California Environmental Quality Act (CEQA) Exemption.

COUNCIL ACTION REQUIRED:

Staff Recommendation:

Award Construction Contract
Approve Project Plans and Specifications
Approve Project Contingency
Declare CEQA Exemption
RECOMMENDATION AND STAFF SUMMARY:

The Rowley Park Basketball courts are located at 13220 Van Ness Ave. Phase 1 of the project includes upgrading existing lighting to high efficiency LED fixtures, new upgraded poles/fixtures, replacement of basketball fixtures, drainage improvements, concrete repair, and replacement of sand in playground with poured in place resilient surfacing.

Upon completion of Phase 1, the City will go out to bid for Phase 2 of the project, which will consist of the resurfacing and restriping of the basketball courts. One of the courts will be restriped for pickleball activities.

The following six (6) bids for the Phase 1 improvements were received on January 30, 2025:

Organization Bid Amount

1. Green Giant Landscape, Inc., La Habra $483,352.14 (Non-responsive)

2. Zeco, Inc., Yorba Linda $588,537.55

3. Aguilar & Calderon Corp., Whittier $632,945.14

4. We R Builders, Inc., La Crescenta $639,902.14

5. KASA Construction, Inc. Chino $715,558.14

6. US Builders and Consultants, Inc. Irvine $848,390.14 Green Giant Landscape (GGL) submitted the apparent lowest bid in the amount of $483,352.14. However, their bid was deemed non-responsive because GGL does not hold a C-10 electrical license and failed to list an electrical licensed subcontractor. Per State Contract Code 4104(a), the general contractor is required to list a subcontractor who will perform work, labor, or services for the prime contractor in connection with the construction of the project amount equal to or exceeding one-half of one percent (0.5%) of the prime contractor's total bid. GGL did not fulfill this requirement. Therefore, Zeco Inc., emerged as the lowest responsible bidder. They are a state licensed contractor with verified successful construction experience in the field and will be required to meet all bonding and financial standards. The tentative construction start date is April 2025 with an anticipated project completion in August 2025.

Zeco Inc. had mathematical errors on their bid schedule that resulted in a $9.28 increase on their total bid amount. The corrected total bid amount is $588,537.55. Zeco Inc. remains the second lowest bidder with the corrected total bid amount.

Staff respectfully recommends that the City Council award the construction contract for the Gardena Rowley Park Basketball Rehabilitation Project, JN 530, to Zeco Inc., in the amount of $588,537.55, and additionally:
a. Approve the project plans and specifications.
b. Approve a 15% of the construction award amount, $88,000, to be utilized for the project contingency.
c. Declare this project to be categorically exempt under the CEQA, Class 1, Section 15301 (d), as rehabilitation of existing facilities.

FINANCIAL IMPACT/COST:

Source of Funds:

Prop 68 $210,000.00
Deferred Maintenance Fund $500,000.00
Measure A $224,704.00
Total
$934,704
Estimated Expenditures:

Design Phase Expenditures During FY 24-25 $9,370.50
Construction Support Services and Job Cost $20,000.00
Phase l - Construction Contract Award
$588,537.55
Phase ll - Estimated Construction Budget $228,000.00
15% Project Contingency $88,000.00
Total
$933,908.05
ATTACHMENTS:

JN 530 PH1_Specs.pdf
JN 530 PH1 Plans.pdf
JN 530 PH 1_CEQA_NOE.pdf
JN 530 - Zeco, Inc. 1-30-2025.pdf
JN 530 project location map.pdf
APPROVED:
___________________________________
Clint Osorio, City Manager

CITY OF GARDENA

CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR

ROWLEY PARK IMPROVEMENTS

BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE,

ELECTRICAL AND SITE FURNISHING
JN 530
PHASE 1
OCTOBER 2024 JANUARY 2025

CITY OF GARDENA

CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR

ROWLEY PARK IMPROVEMENTS

BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE,

ELECTRICAL AND SITE FURNISHING
JN 530
PHASE 1
Plans & Specifications prepared by:

Memoranda:

Plans and specifications are available at Planwell Administrator, 562.436.9761 or https://www.e-arc.com/location/costa-mesa/ (Go to Planrooms/Order From Planwell/Public Planroom and select City of Gardena under pulldown menu) Bid Results: https://www.cityofgardena.org/public-contracts/ City of Gardena Public Works Engineering Division: 310.217.9568 10/7/2024

CITY OF GARDENA

NOTICE INVITING BIDS
for

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING PROJECT NO. JN 530
Plans and Specifications are available through ARC Document Solutions. Please be advised that there is an additional charge for delivery. Upon payment of the purchase price, they become the property of the purchaser and may not be returned for refund.

You may access the plans through the following website under Public Planroom:
https://www.e-arc.com/location/costa-mesa/
(Scroll down to “Planrooms”/”Order From PlanWell”/”Public Planroom” and select City of Gardena under the “in all company” pulldown menu) or
https://customer.earc.com/arcEOC/Secures/PWELL_PrivateList.aspx?PrjType=Pub&mem=29&c For help accessing and ordering, please contact a Planwell Administrator at 562.436.9761.

Notice is hereby given that the City of Gardena will receive sealed bids at the office of the City Clerk, City Hall, 1700 W. 162nd Street, Gardena, California, until 2:00pm on January 30, 2025, and shortly thereafter on this same day, they will be publicly opened and read in the City Clerk’s Office in-person and via ZOOM.

The information to join the bid opening via ZOOM is the following:

Topic: Bid Opening
Time: 2:00 PM on Jan. 30, 2025 (Shortly thereafter the deadline) Join ZOOM Meeting
https://us02web.zoom.us/j/89407151911
Meeting ID: 894 0715 1911
Dial by phone: +1 669 444 9171 US
Should you have any questions or concern in delivering a bid or joining the ZOOM Meeting, please contact City Clerk’s office at (310) 217-9565 or via email at [email protected].

All bids must be in writing, must be sealed, and must be plainly marked on the outside:
"BID ON PROJECT NO. JN 530 Phase 1. Any bid received after the hour stated above for any reason whatsoever, will not be considered for any purpose but will be returned unopened to the bidder.

Bids are required for the entire work as described below:

The Scope of Work includes replacement of basketball units. Replacement of existing light poles and upgrade to LED lights. Install dry wells, drainpipes, and electrical conduits.

Replace sand in tot lot with crushed rock base and 2-layer pour-in-place playground surfacing.

ENGINEER’S ESTIMATE: $392,000
The time of completion of contract shall be 90 working days as defined in the latest Standard Specifications for Public Works (“Greenbook”). Liquidated Damages, as defined in Section 6-9, shall be $500 per each consecutive calendar day.

Each bidder must submit a proposal to the City, c/o City Clerk in accordance with the Plans and Specifications. Said proposal is to be accompanied by a cash deposit, a certified or cashier's check, or a bidder's bond, made payable to the City of Gardena, in an amount not less than 10 percent of the total bid submitted.

The envelope enclosing the proposal shall be sealed and addressed to the City of Gardena c/o City Clerk and delivered or mailed to the City at 1700 W. 162nd Street, Gardena, California 90247-3778. The envelope shall be plainly marked in the upper lefthand corner as follows:

ATTENTION: CITY, c/o CITY CLERK
(Bidder's Name and Address)
(Number and title of this project)
The successful bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the contract price, and a payment bond in the amount of 100 percent of the contract price, both in a form satisfactory to the City Attorney.

The contractor shall have an active Class “A” license from the Contractor’s State License Board at the time of submitting bid.

The prime Contractor must perform at least 30% of the cost of the contract, not including the cost of materials, with its own employees on site.

Pursuant to Public Contract Code Section 22300, the Contractor may, at Contractor's sole cost and expense, substitute securities equivalent to any monies withheld by the City to insured performance under the contract unless applicable federal regulations or policies do not allow such substitution. Such security shall be deposited with the City, or a state or federally chartered bank as escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the Contract. The Contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any accrued interest thereon. Securities eligible for investment shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. No such substitution shall be accepted until the escrow agreement, letter of credit, form of security and any other document related to said substitution is reviewed and found acceptable by the City Attorney.

The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive responsible bidder.

Bidders are advised that this Project is a public work for purposes of the California Labor Code, which requires payment of prevailing wages. Accordingly, the bidder awarded the Contract and all subcontractors shall be required to pay not less than the prevailing rate of per diem wages, as determined by the Director of the California Department of Industrial Relations, and otherwise comply with the provisions of Section 1770 et seq. of the California Labor Code, California Code of Regulations, Title 8, Section 16000 et seq., and any other applicable laws, rules and regulations adopted with respect thereto (“California Prevailing Wage Laws”).

Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by Contractor or any Subcontractor under it.

Contractor and any Subcontractor under if shall comply with the requirements of said sections in the employment of apprentices.

The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) in a format prescribed by the Labor Commissioner no less than monthly.

As of January 1, 2016, the requirement to furnish electronic certified payroll records to the Labor Commissioner will apply to all public works projects, whether new or ongoing. City may require a copy of the electronic certified payroll records submitted to the DIR at any time.

Exceptions: The Labor Commissioner may (but is not required to) excuse contractors and subcontractors from furnishing electronic certified payroll records to the Labor Commissioner on a project that is under the jurisdiction of one of the four legacy DIRapproved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District, and County of Sacramento) or that is covered by a qualifying project labor agreement.

These requirements will apply to all public works projects that are subject to the prevailing wage requirements of the Labor Code without regard to funding source.

The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/index.htm).

Skilled and Trained Workforce: This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.

Award of Contract: The following are conditions to the award of the contract:

I. Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5 provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract was awarded): and
II. No contractor or subcontractor may be awarded this contract unless the contractor and each subcontractor listed on the bid is registered with the Department of Industrial Relations pursuant to Section 17265.5.

Any questions regarding this bid package may be referred to Jose Espinoza, Public Works Engineering Division at 310.217.9644 or [email protected].

The time of completion of contract shall be 90 working days as defined in the latest Standard Specifications for Public Works (“Greenbook”). Liquidated Damages, as defined in Section 6-9, shall be $500 per each consecutive calendar day.

Each bidder must submit a proposal to the City, c/o City Clerk in accordance with the Plans and Specifications. Said proposal is to be accompanied by a cash deposit, a certified or cashier's check, or a bidder's bond, made payable to the City of Gardena, in an amount not less than 10 percent of the total bid submitted.

The envelope enclosing the proposal shall be sealed and addressed to the City of Gardena c/o City Clerk and delivered or mailed to the City at 1700 W. 162nd Street, Gardena, California 90247-3778. The envelope shall be plainly marked in the upper lefthand corner as follows:

ATTENTION: CITY, c/o CITY CLERK
(Bidder's Name and Address)
(Number and title of this project)
The successful bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the contract price, and a payment bond in the amount of 100 percent of the contract price, both in a form satisfactory to the City Attorney.

The contractor shall have an active Class “A” license from the Contractor’s State License Board at the time of submitting bid.

The prime Contractor must perform at least 30% of the cost of the contract, not including the cost of materials, with its own employees on site.

Pursuant to Public Contract Code Section 22300, the Contractor may, at Contractor's sole cost and expense, substitute securities equivalent to any monies withheld by the City to insured performance under the contract unless applicable federal regulations or policies do not allow such substitution. Such security shall be deposited with the City, or a state or federally chartered bank as escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the Contract. The Contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any accrued interest thereon. Securities eligible for investment shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. No such substitution shall be accepted until the escrow agreement, letter of credit, form of security and any other document related to said substitution is reviewed and found acceptable by the City Attorney.

The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive responsible bidder.

Bidders are advised that this Project is a public work for purposes of the California Labor Code, which requires payment of prevailing wages. Accordingly, the bidder awarded the Contract and all subcontractors shall be required to pay not less than the prevailing rate of per diem wages, as determined by the Director of the California Department of Industrial Relations, and otherwise comply with the provisions of Section 1770 et seq. of the California Labor Code, California Code of Regulations, Title 8, Section 16000 et seq., and any other applicable laws, rules and regulations adopted with respect thereto (“California Prevailing Wage Laws”).

Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by Contractor or any Subcontractor under it.

Contractor and any Subcontractor under if shall comply with the requirements of said sections in the employment of apprentices.

The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) in a format prescribed by the Labor Commissioner no less than monthly.

As of January 1, 2016, the requirement to furnish electronic certified payroll records to the Labor Commissioner will apply to all public works projects, whether new or ongoing.

City may require a copy of the electronic certified payroll records submitted to the DIR at any time.

Exceptions: The Labor Commissioner may (but is not required to) excuse contractors and subcontractors from furnishing electronic certified payroll records to the Labor Commissioner on a project that is under the jurisdiction of one of the four legacy DIRapproved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District, and County of Sacramento) or that is covered by a qualifying project labor agreement.

These requirements will apply to all public works projects that are subject to the prevailing wage requirements of the Labor Code without regard to funding source.

The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at
http://www.dir.ca.gov/DLSR/PWD/index.htm).

Skilled and Trained Workforce: This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.

Award of Contract: The following are conditions to the award of the contract:

I. Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5 provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract was awarded): and
II. No contractor or subcontractor may be awarded this contract unless the contractor and each subcontractor listed on the bid is registered with the Department of Industrial Relations pursuant to Section 17265.5.

Any questions regarding this bid package may be referred to Jose Espinoza, Public Works Engineering Division at 310.217.9644 or [email protected].

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING ii

TABLE OF CONTENTS

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING

DESCRIPTION PAGE
Title Page ..............................................................

Notice Inviting Bids ................................................

Location Map .........................................................

Table of Contents .................................................. i Instructions to Bidders ........................................... ii-iv BID PROPOSAL (To Be Submitted with Proposal)
Bid Schedule ......................................................... BP-2 Acknowledgement of Addenda Received .............. BP-5 Bidders Declaration ............................................... BP-6 Non-collision Affidavit ............................................ BP-8 Declaration of Eligibility of Contract ....................... BP-9 Bid Bond ............................................................... BP-10 Designation of Subcontractors ............................... BP-11 Construction Project Reference ............................. BP-12 Certificate of Non-Discrimination by Contractors.... BP-13 Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion-
Primary Covered Transition ................................. BP-14 CONTRACT DOCUMENTS (To Be Submitted after
Award)
Agreement ............................................................ CD-2 Faithful Performance Bond .................................... CD-4 Payment Bond ....................................................... CD-6 Workers’ Compensation Insurance Certificate ....... CD-8 Indemnification and Hold Harmless Agreement
Of Subrogation and Contribution ......................... CD-9 Insurance .............................................................. CD-10

GENERAL PROVISIONS
PART 1 – GENERAL PROVISIONS ...................... GP-1 Section 1 – General ............................................... GP-1 Section 2 – Scope of the Work .............................. GP-5 Section 3 – Control of the Work ............................. GP-7 Section 4 – Control of Material .............................. GP-9 Section 5 – Legal Relations and Responsibilities ... GP-10 Section 6 – Prosecution and Progress of the Work GP-11
Section 8 – Facilities for Agency Personnel ........... GP-15

CSI TECHNICAL PROVISIONS
SECTION 01 50 00 TEMPORARY FACILITIES AND
CONTROLS .......................................................... 01 50 00-1 PART 1 GENERAL

1.1 Summary ........................................................ 01 50 00-1

1.2 Use Charges ................................................... 01 50 00-1

1.3 Submittals ...................................................... 01 50 00-1

1.4 Quality Assurance ........................................... 01 50 00-1

1.5 Project Conditions ........................................... 01 50 00-1 Part 2 Products

2.1 Materials.......................................................... 01 50 00-1

2.2 Temporary Facilities ........................................ 01 50 00-1 Part 3 Execution

3.1 Install General ................................................. 01 50 00-1

3.2 Temporary Utility Installation............................ 01 50 00-2

3.3 Support Facilities Installation ........................... 01 50 00-2

3.4 Security & Protection Installation ..................... 01 50 00-3

3.5 Operation Termination, and Removal .............. 01 50 00-4

DESCRIPTION PAGE
SECTION 01 70 00 – CONTRACT CLOSEOUT .... 01 70 00
Part 1 General

1.1 Summary.......................................................... 01 70 00-1

1.2 Requirements Preparation to Final Inspection .. 01 70 00-1

1.3 Final Inspection ................................................ 01 70 00-1

1.4 Record Specifications and Prints ...................... 01 70 00-1

1.5 Operation & Maintenance Data Submitted........ 01 70 00-1

1.6 Instruction of Owner’s Maintenance Personnel 01 70 00-2

1.7 Manufacturer’s Warranties ............................... 01 70 00-2 SECTION 02 41 00 – DEMOLITION ...................... 02 40 00-1 Part 1 General

1.1 Summary.......................................................... 02 41 00-1

1.2 Related Documents .......................................... 02 41 00-1

1.3 Reference Standards ....................................... 02 41 00-1

1.4 Definitions ........................................................ 02 41 00-1

1.5 Submittals ........................................................ 02 41 00-1 Part 2 Products – Not Used
Part 3 Execution

3.1 Scope ............................................................... 02 41 00-2

3.2 General Procedures & Project Conditions ........ 02 41 00-2

3.3 Existing Utilities ................................................ 02 41 00-3

3.4 Preparation ...................................................... 02 41 00-3

3.5 Cutting Existing Concrete & Asphalt ................. 02 41 00-4

3.6 Explosives ........................................................ 02 41 00-4

3.7 Pollution Controls ............................................. 02 41 00-4

3.8 Debris & Waste Removal ................................. 02 41 00-4

3.9 Protection ......................................................... 02 41 00-4 SECTION 03 10 00 CONCRETE FORMING &
ACCESSORIES ..................................................... 03 10 00-1 Part 1 General

1.1 Summary of ...................................................... 03 10 00-1

1.2 System Description .......................................... 03 10 00-1

1.3 Submittals ........................................................ 03 10 00-1

1.4 Quality Assurance ............................................ 03 10 00-1

1.5 Delivery, Storage, & Handling .......................... 03 10 00-1 Part 2 Products

2.1 General ............................................................ 03 10 00-1 Part 3 Execution

3.1 General ............................................................ 03 10 00-2

3.2 Erection ............................................................ 03 10 00-2

3.3 Removal of Forms ............................................ 03 10 00-3

3.4 Protection ......................................................... 03 10 00-3

3.5 Clean-up .......................................................... 03 10 00-3 SECTION 03 20 00 – CONCRETE
REINFORCING ..................................................... 03 20 00-1 Part 1 General

1.1 Summary.......................................................... 03 20 00-1

1.2 System Description .......................................... 03 20 00-1

1.3 Submittals ........................................................ 03 20 00-1

1.4 Quality Assurance ............................................ 03 20 00-1

1.5 Delivery, Storage, Handling, & Marking ............ 03 20 00-2 Part 2 Products

2.1 General ............................................................ 03 20 00-2

2.2 Materials .......................................................... 03 20 00-2

2.3 Fabrication of Reinforcing Bars ........................ 03 20 00-2 Part 3 Execution

3.1 Installation ........................................................ 03 20 00-2

3.2 Clean Up .......................................................... 03 20 00-3

3.3 Protection ......................................................... 03 20 00-3

3.4 Field Quality Control ......................................... 03 20 00-3 ii

DESCRIPTION PAGE
SECTION 03 30 00 – CAST IN-PLACE CONCRETE
.............................................................................. 03 30 00-1 Part 1 General

1.1 Summary ......................................................... 03 30 00-1

1.2 Submittals ....................................................... 03 30 00-1

1.3 Quality Assurance ........................................... 03 30 00-1

1.4 Delivery, Storage, & Handling .......................... 03 30 00-2

1.5 Job Conditions ................................................. 03 30 00-2 Part 2 Products

2.1 General ........................................................... 03 30 00-2

2.2 Materials.......................................................... 03 30 00-3

2.3 Concrete Mixing .............................................. 03 30 00-4 Part 3 Execution

3.1 General ........................................................... 03 30 00-4

3.2 Preparation ...................................................... 03 30 00-5

3.3 Installation ....................................................... 03 30 00-5

3.4 Finishing .......................................................... 03 30 00-6

3.5 Expansion & Construction Joints ..................... 03 30 00-6

3.6 Testing ............................................................ 03 30 00-7

3.7 Clean Up ......................................................... 03 20 00-7 SECTION 12 93 00 – SITE FURNISHING ............. 12 93 00-1 General ................................................................ 12 93 00-1 Products ................................................................ 12 93 00-1 Installation ............................................................. 12 93 00-1 SECTION 26 00 00 – BASIC ELECTRICAL
REQUIREMENS.................................................... 23 00 10-1 Part 1 General

1.01 Scope ............................................................ 26 00 10-1

1.02 General Requirements................................... 26 00 10-1

1.03 Project Record Documents ............................ 26 00 10-1 Part 2 Commissioning

2.01 Commissioning of Electrical Systems ............ 26 00 10-1 SECTION 31 22 19 – FINISHING GRADING ........ 31 22 19-1 Part 1 General

1.1 Related Documents ......................................... 31 22 19-1

1.2 Summary ......................................................... 31 22 19-1

1.3 Definitions ....................................................... 31 22 19-1 Part 2 Products

2.1 Materials.......................................................... 31 22 19-1 Part 3 Execution

3.1 Examination .................................................... 31 22 19-1

3.2 Preparation ...................................................... 31 22 19-1

3.3 Installation ....................................................... 31 22 19-1

3.4 Field Quantity Control ...................................... 31 22 19-2 SECTION 32 12 43 – PERVIOUS CONCRETE ..... 32 12 43-1
Part 1 General

1.01 Scope of Work ............................................... 32 12 43-1

1.02 References .................................................... 32 12 43-1

1.03 Quality Assurance ......................................... 32 12 43-1

1.04 Special Equipment ......................................... 32 12 43-1

1.05 Submittals ..................................................... 32 12 43-2

1.06 Test Panels ................................................... 32 12 43-2 Part 2- Materials

2.01 Cement.......................................................... 32 12 43-2 202 Supplementary Cementitious Materials ........... 32 12 43-2

2.03 Chemical Additives ........................................ 32 12 43-2

2.04 Aggregates .................................................... 32 12 43-2

2.05 Water ............................................................ 32 12 43-2

2.06 Mixture .......................................................... 32 12 43-2 Part 3- Execution

3.01 Subgrade ....................................................... 32 12 43-3

3.02 Formwork ...................................................... 32 12 43-3

3.03 Mixing and Hauling ........................................ 32 12 43-3

3.04 Placing and Finishing .................................... 32 12 43-3

3.05 Curing ........................................................... 32 12 43-4

3.07 ....................................................................... Quality Control .............................................................................. 32 12 43-4 SECTION 32 18 16 – RESILIENT PLAYGRUND SURFACING
.............................................................................. 32 18 16-1 Part 1 General

1.1 related Documents ........................................... 32 18 16-1

1.2 Summary.......................................................... 32 18 16-1

1.3 Related Sections .............................................. 32 18 16-1

1.4 References ....................................................... 32 18 16-1

1.5 System Description .......................................... 32 18 16-1

1.8 Submittals ........................................................ 32 18 16-2

1.7 Quality assurance ............................................ 32 18 16-2

1.8 Delivery Storage & Handling ............................ 32 18 16-2

1.9 Project Site Conditions ..................................... 32 18 16-2

1.10 Warranty ........................................................ 32 18 16-2 Part 2 Products

2.1 Spectraturf ....................................................... 32 18 16-3

2.2 Mixes ............................................................... 32 18 16-3 Part 3 Execution

3.1 Manufacturing Instructions ............................... 32 18 16-3

3.2 Examination ..................................................... 32 18 16-3

3.3 Preparations ..................................................... 32 18 16-4

3.4 Installation ........................................................ 32 18 16-4

3.5 Protection ......................................................... 32 18 16-4 Part 2 Products – Not Used
Part 3 Execution

3.1 Examination ..................................................... 31 22 19-1

3.2 Preparation ...................................................... 31 22 19-1

3.3 Installation ........................................................ 31 22 19-1

3.4 Field Quantity Control ....................................... 31 22 19-2 SECTION 32 34 01 – TREE LANDSCAPE
PRESERVATION ................................................... 32 34 01-1 Part 1 General

1.1 Tree Protection................................................. 32 34 01-1 Part 2 Products – Not Used
Part 3 Execution

3.1 Demolition & Site Clearing ................................ 32 34 01-1

3.2 Construction ..................................................... 32 34 01-2 SECTION 32 90 00 LANDSCAPE PLANTING ....... 32 90 00-1
Part 1 General

1.01 General .......................................................... 32 90 00-1

1.02 Scope of Work................................................ 32 90 00-1

1.03 Quality Assurance .......................................... 32 90 00-1

1.04 Job Conditions ............................................... 32 90 00-1

1.05 Submittals ...................................................... 32 90 00-2

1.06 Product Delivery, Storage & Handling ............ 32 90 00-2 Part 2 Products

2.1 Materials .......................................................... 32 90 00-4 Part 3 Execution

3.1 Surface conditions & Protection of Property ..... 32 90 00-8

3.2 Inspection......................................................... 32 90 00-8

3.3 Preparation ...................................................... 32 90 00-8

3.4 Planting Installation .......................................... 32 90 00-8

3.5 Clean Up .......................................................... 32 90 00-11 SECTION 33 34 DRAINAGE AND SEWER PIPING 33 34 00-1
Part 1 General

1.01 General .......................................................... 33 34 00-1

1.02 Description ..................................................... 33 34 00-1

1.03 Submittals ...................................................... 33 34 00-1

1.04 Delivery Storage and Handling ....................... 33 34 00-1

1.05 Products ......................................................... 33 34 00- 1

EXECUTION

3.01 General .......................................................... 33 34 00-2

3.02 Installation ...................................................... 33 34 00-2

APPENDIX
APPENDIX A: Geotechnical Investigation / Soils Report
iv

INSTRUCTIONS TO BIDDERS

FORM OF PROPOSAL
The Proposal shall be fully executed and submitted on the forms in the project specifications and shall be enclosed in a sealed envelope marked and addressed as directed in the Notice Inviting Bids.

PROPOSAL / BID DOCUMENTS
All Proposals shall include the following executed documents to be submitted with each bid:

Bidding Schedule
Acknowledgement of Addenda Received
Bidder's Declaration
Non-Collusion Affidavit
Declaration of Eligibility of Contract
Bid Bond
Designation of Subcontractors
Construction Project Reference
Certificate of Non-Discrimination by Contractors
Certification of Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Primary Covered Transitions

DELIVERY OF PROPOSAL
The Proposal shall be delivered by the time and to the place stipulated in the Notice Inviting Bids. It is the bidder's sole responsibility to see that its Proposal is received as stipulated. Any Proposal received after the scheduled closing time for receipt of proposals will be returned to the bidder unopened.

WITHDRAWAL OF PROPOSAL
The Proposal may be withdrawn by the bidder by means of a written request, signed by the bidder or its properly authorized representative. Such written request must be delivered to the place stipulated in the Notice Inviting Bids for receipt of proposals prior to the scheduled closing time for receipt of proposals. No Proposal may be withdrawn after the hour fixed for opening bids.
v

MODIFICATIONS AND ALTERNATIVE PROPOSALS
Unauthorized conditions, limitations, or provisions attached to the Proposal will render it informal and may be grounds for its rejection as non-responsive. The completed Proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. Oral, telegraphic, or telephonic proposals or modifications will not be considered.

DISCREPANCIES IN PROPOSALS
In the event there is more than one bid item in a Bidding Schedule, the bidder shall furnish a price for all bid items in the Schedule, and failure to do so will render the Proposal informal and may be grounds for its rejection as non-responsive. The bidder shall state in words and figures the unit prices or the specific sums as the case may be, for which it proposes to supply the labor, materials, supplies, or machinery, and completely perform the Contract. The total amount of each item bid and the total amount of the bid shall be stated in words and figures.

In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount named by a bidder for any items are not in agreement, the unit price alone will be considered as representing the bidder's intention and the total will be corrected to conform thereto.

PROPOSAL GUARANTEE – BIDDER’S SECURITY
Each bidder shall submit with his Proposal cash, an unconditional certified or cashier's check, or a bidder's bond, in the sum of the percentage of the bid stated in the Notice Inviting Bids, payable to the City as a guarantee that the bidder will, if its Proposal is accepted, execute the Contract and furnish a satisfactory Faithful Performance Bond, a satisfactory Payment Bond and insurance certificates as specified herein.

If a bidder to whom an award is made, fails or refuses to sign the Contract or furnish the required bonds and certificates, all within the time stated in Section 2-1.5 of the Special Provisions herein, the funds represented by said cash, check or bidder's bond shall be forfeited and become and remain the property of the City; the amount thereof being agreed to by the bidder and the surety as a bid bond forfeiture due to the City because of the delay in the execution of the Contract and in the performance of work thereunder, resulting from such failure or refusal, except that if the City awards the contract to the next lowest responsive responsible bidder, only that portion of the bidder's security equal to the difference between the two bids will be forfeited.

A Bid Bond must be obtained from a corporate surety authorized to do business as such in the State of California as an “admitted surety insurer” and shall be on the form furnished by the City or one substantially in conformance with it. Certified or cashier's checks must be drawn on a solvent state or nationally chartered bank or branch thereof in the State of California. The liability of the City in connection with the checks shall be limited to the return of the checks (without interest) as provided in Section 2-1.6 of the Special Provisions bound herein.

DISQUALIFICATION OF BIDDERS
A person, firm, or corporation shall NOT be allowed to make or file, or to be interested in, more than one bid, except an alternative bid when specifically requested; provided, however, a person, firm, or corporation who has submitted a sub-proposal to a bidder vi
submitting a Proposal, or who has quoted prices on materials to such bidders, is not thereby disqualified from submitting a sub-proposal or from quoting prices to other bidders submitting proposals, or from submitting a Proposal as a prime contractor.

Similarly, failure to comply with the registration requirements of Labor Code Section 1725.5, as further described in the Notice Inviting Bids, will disqualify a bidder.

ADDITIONAL REQUIREMENTS
The bidder's attention is directed to the Special Provisions and Technical Provisions bound herein for additional requirements of the Proposal and Contract Documents.

CONTRACT DOCUMENTS
Contract Documents are to be submitted within twenty-one (21) calendar days AFTER award of contract unless extended by agreement of the City. Failure to timely submit executed Contract Documents may be grounds for rejecting the bid award and forfeiture of the bid security. See enclosed documents commencing on page CD-1.

TO BE SUBMITTED WITH PROPOSAL
BP-1

BID PROPOSAL (BP)

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING PROJECT NO. JN 530 Phase 1
Contractor:

Address:

Phone:

Fax:

License No.:

D.I.R. No.

Email:

To Be
Submitted
WITH
Bid Package

TO BE SUBMITTED WITH PROPOSAL
BP-2

BID PROPOSAL
PROJECT NO. JN 530_Phase 1

BID SCHEDULE
The undersigned, having examined the proposed Contract Documents titled:

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING and having visited the site and examined the conditions affecting the work, hereby proposes and agrees to furnish all labor, materials, equipment, and appliances, and to perform operations necessary to complete the work as required by said proposed Contract Documents and itemized bid schedule below. All work shall be completed within 90 Working Days from the date the Notice of Proceed is issued by the Engineer.

Item
No. Item Description Unit Approx. Quantity
Unit
Price in
Figures
Item Total
1 Mobilization & Demobilization (5%) LS 1

2 Permits LS 1 $3,291.14 $3,291.14
3 Sawcut, Remove and Dispose
Existing Concrete Paving
SF 1,256

4 Provide Concrete Crack Repair &
Grind to Even Plane
LS 1

5 Remove and Dispose of Existing
Basketball
Post/Hoop/Backboard/Conc.

Footing.

EA 4

6 Grading Export (Cut) Tot Lot Area CY 255

7 Construct Concrete Pavement SF 1610

8 Furnish & Install Crushed Rock
Subbase & Filter Fabric for Tot Lot
CY 141

9 Furnish & Install 4-inch Permeable
Concrete Subslab
CY 65

10 Furnish & Install 2-Layer Pouredin-Place Resilient SurfacingCY 49

11 Furnish & Install Basketball Post,
Hoop, Backboard & Concrete
Footing
EA 4

TO BE SUBMITTED WITH PROPOSAL
BP-3
12 Furnish & Install NDS FWAS24
Drywell (Or Equal)
EA 6

13 Furnish & Install 12-inch Brooks Catch
Basin 1212CB or equal
EA 5

14 Furnish & Install 18-inch Brooks Catch
Basin 1818CB or equal
EA 1

15 Furnish & Install 24-inch Brooks Catch
Basin 2424CB or equal
EA 1

16 Furnish and install 4-Inch Sch 40 PVC
Drainpipe
LF 555

17 Furnish & Install Miscellaneous Turf &
Irrigation Repair
LS 1

18 Remove & Dispose of Existing
Post, Light Fixture and Footing
EA 3

19 Remove Existing Light Fixture
(Pole to Remain)
EA 1

20 Remove and Dispose of Existing Wall
Mounted Light Fixtures
EA 3

21 Furnish & Install (S1) Slim Style
Type FT Optics, 20' Pole Mount
EA 1

22 Furnish & Install (S2) Duel Slim Style
Type FT Optics, 20' Pole Mount
EA 1

23 Furnish & Install (S3) Slim Style
Type FT Optics, Mount on Existing
Pole
EA 1

24 Furnish & Install (S4) Wall
Mounted LED Fixture w/ 0-10V
Dimming
EA 3

25 Furnish & Install (S5) Slim Style
Type 5W Optics, 20' Pole Mount
EA 2

26 Furnish & Install (2)#10, (1) #10G / 1"
Conduit
LF 83

27 All Other Miscellaneous Electrical
Work
LS 1

TO BE SUBMITTED WITH PROPOSAL
BP-4
BID SCHEDULE (Continued)
TOTAL CONTRACT BID:
(Figures) $
(Words)
* In case of error in extension of price into the total price column, the unit price will govern.

All work required and shown on the construction plans and this specification for which no price or item is listed on this proposal, it shall be understood that such work, equipment, labor, tools and materials shall be provided without extra charge, allowance or direct payment of any kind.

Payment for performing such work or furnishing such equipment, labor, tools and materials shall be included in the above lump sum or unit bid prices and no additional compensation will paid therefor.

If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid will be replaced as non-responsive.

In case of any discrepancy between the words and the figures, the words shall prevail.

If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the bidder’s intention and all totals will be corrected to conform thereto.

Attached hereto is cash, a certified check, a cashier's check, or a bidder's bond in the amount of__________________________________________________________________Dollars said amount being not less than 10 percent of the amount bid. Pursuant to Public Contract Code Sections 20172 and 20174, it is agreed a portion equal to the difference between the low bid and second low bid shall be retained as a bid bond forfeiture by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.

Name of Bidder
Signature of Bidder

TO BE SUBMITTED WITH PROPOSAL
BP-5

BID PROPSOAL
PROJECT NO. JN 530 Phase 1_

ACKNOWLEDGEMENT OF ADDENDA RECEIVED
The Bidder shall acknowledge the receipt of addenda by number and date each addendum received.

Addendum No. Date Addendum No. Date
Addendum No. Date Addendum No. Date
Addendum No. Date Addendum No. Date
Addenda will be issued only through the ARC Document Solutions and access under their “Planrooms”/”Order From Planwell” (https://www.e-arc.com/location/costa-mesa/).

It is the Bidder’s sole responsibility to visit the Planroom to obtain and administer any Addendum related to this bid. An Addendum must be acknowledged above by a bidder in its submitted form of Proposal.

If an addendum or addenda has been issued by the City and not noted above as being received by the Bidder, the Bid Proposal may be rejected.

Bidder’s Signature Date

TO BE SUBMITTED WITH PROPOSAL
BP-6

BID PROPOSAL
PROJECT NO. JN 530 Phase 1

BIDDER'S DECLARATION
It is understood and agreed that:

1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.

2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.

3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.

4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.

The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.

5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding. The undersigned has not in any manner sought by collusion to secure for himself any advantage over any other bidder.

6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the City after evaluation of the bids as submitted. The undersigned agrees that the City shall recover or retain as a bid bond forfeiture an amount equal to the difference between the low bid and amount of the bid of the bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest bidder in accordance with the provisions of the Public Contract Code Sections 20172 and 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.

TO BE SUBMITTED WITH PROPOSAL
BP-7
BIDDER'S DECLARATION (Continued)

7. The undersigned bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.

Respectfully submitted,
Contractor's Business Name Contractor (Print) Title
Business Address: Street Signature Title
City State Zip Contractor's License No. and Classification Business Phone Number Business Fax Number
Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the bidder, whose address must be given: if it is made by a firm, it must be signed in the copartnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each partner (general and/or limited) must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.

TO BE SUBMITTED WITH PROPOSAL
BP-8

BID PROPOSAL
PROJECT NO. JN 530 Phase 1_

NON-COLLUSION AFFIDAVIT
(To be executed by Bidder and submitted with Bid)
State of California
County of Los Angeles
being first duly sworn, deposes
and says that he or she is of
the party making the foregoing bid, that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, or agent thereof to effectuate a collusive or sham bid.

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP

ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)

TO BE SUBMITTED WITH PROPOSAL
BP-9

BID PROPOSAL
PROJECT NO. JN 530 Phase 1_

DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] The undersigned, a duly authorized representative of the contractor, certifies and declares that:

1. The undersigned contractor is aware of Sections 1777.1 and 1777.7 of the California Labor Code, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The undersigned contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The undersigned contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.”
“(b) Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract, and any public money that may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the awarding body. The contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”

4. The undersigned contractor has investigated the eligibility of each and every subcontractor the undersigned contractor intends to use on this public works project, and has determined that none of them are ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, 20 _, at
(place of execution),
California .

Signature: Name:

Title: Company:

TO BE SUBMITTED WITH PROPOSAL
BP-10

BID PROPOSAL
PROJECT NO. JN 530 Phase 1_

BID BOND
KNOW ALL MEN BY THESE PRESENTS:

THAT , as
Principal, and , as
Surety, are
held firmly bound unto the City of Gardena in the sum of $ ;

DOLLARS,
(not less than ten percent of total amount of bid)
for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a bid to the City to perform all work required under the following:

PROJECT: ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING JN 530
NOW, THEREFORE, if said Principal is awarded a Contract by the City and, within the time and in the manner required in the Specifications for said project, enters into the written form of Contract bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, then this obligation shall be null and void, otherwise it shall remain in full force and effect.

In the event suit is brought upon this bond by the City and judgment is recovered, said Surety shall pay all costs incurred by the City in such suit, including a reasonable attorneys’ fee to be fixed by the court. Surety hereby waives the provisions of California Civil Code §2845.

SIGNED AND SEALED, this day of , 20 .
(SEAL) (SEAL)
Principal Surety
BY: BY:

Signature Signature
Note: This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney–in-fact must be attached.

TO BE SUBMITTED WITH PROPOSAL
BP-11

BID PROPOSAL
PROJECT NO. JN 530 Phase 1_

DESIGNATION OF SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100- 4113 of the Public Contract Code of the State of California, and any amendments thereto, each bidder shall set forth below the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

If the contractor fails to specify a subcontractor for any portion of the work to be performed under the contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the City.

Portion
of Work
% Subcontractor's Name & Address
Type of
Work
State
License
Number Class
D.I.R.

Number

Not more than _70_%.

TO BE SUBMITTED WITH PROPOSAL
BP-12

BID PROPOSAL
PROJECT NO. JN 530 Phase 1

CONSTRUCTION PROJECT REFERENCE
In order to more fully evaluate your background and experience for the project herein proposed, please submit a list of Public Works and/or similar construction projects completed or in progress within the last three (3) years. Failure to provide this information may constitute grounds for rejection of your bid as non-responsive.

Number of years as a contractor in construction work of this type:

Three projects of this type recently completed:

1. Name (Firm/Agency):

Address:

Contact Person: Telephone No.:

Title of Project:

Project Location:

Date of Completion: Contract Amount: $

2. Name (Firm/Agency):

Address:

Contact Person: Telephone No.:

Title of Project:

Project Location:

Date of Completion: Contract Amount: $

3. Name (Firm/Agency):

Address:

Contact Person: Telephone No.:

Title of Project:

Project Location:

Date of Completion: Contract Amount: $
NOTE: If requested by the City, the bidder shall furnish a certified financial statement, references, and other information sufficiently comprehensive to permit an appraisal of his current financial condition.

Bidder's Signature

TO BE SUBMITTED WITH PROPOSAL
BP-13

BID PROPOSAL
PROJECT NO. JN 530 Phase 1_

CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.

We agree specifically:

1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.

2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.

3. To take affirmative steps to hire minority employees within the company.

FIRM

TITLE OF PERSON SIGNING

SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:

TO BE SUBMITTED WITH PROPOSAL
BP-14

BID PROPOSAL
PROJECT NO. JN 530 Phase 1_

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION – PRIMARY COVERED TRANSACTIONS
(BEFORE COMPLETING CERTIFICATION, READ INSTRUCTIONS ON NEXT PAGE) The Contractor shall not perform Work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. The Contractor and Subcontractors shall not be debarred or suspended throughout the duration of the Contract pursuant to Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. If the Contractor or any Subcontractor becomes debarred or suspended during the duration of the Project, the Contractor shall immediately notify the City.

1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals:
a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
b. Have not within a 5-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statement, or receiving stolen property;
c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph 1b of this certification; and d. Have not within a 5-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

Signature: Name:

Title: Company:

TO BE SUBMITTED WITH PROPOSAL
BP-15

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION – PRIMARY COVERED TRANSACTIONS
(Continued)

INSTRUCTIONS FOR CERTIFICATION

1. By signing and submitting this proposal, the prospective primary participant is providing the certification set out below.

2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction.

3. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.

4. The prospective primary participant shall provide immediate written notice to the department or agency to which this proposal is submitted if at any time the prospective primary participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department or agency to which this proposal is submitted for assistance in obtaining a copy of those regulations (13 CFR Part 145).

6. The prospective primary participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.

7. The prospective primary participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-- Lower Tier Covered Transactions," provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the ineligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List.

9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.

CD-1

CONTRACT DOCUMENTS (CD)

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING PROJECT NO. JN 530 Phase 1
To be Submitted
within twenty-one (21) calendar days
AFTER
Award of Contract
CD-2

CONTRACT DOCUMENT
PROJECT NO. JN 530 Phase 1

AGREEMENT
THIS AGREEMENT, made and entered into this day of , 20 , by and between CITY OF GARDENA in the State of California, hereinafter referred to as “CITY” and , hereinafter referred to as “CONTRACTOR.”
The City and the Contractor mutually agree as follows:

ARTICLE I.

THE PROJECT
For and in consideration of the mutual promises set forth herein, Contractor agrees to perform and complete in a good and workmanlike manner all work required by the Contract Documents for City Project No. JN 530 Phase 1 , which is described as follows:

TITLE: ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING Said work shall be performed in accordance with the Plans, Specifications and other Contract Documents, all of which are referenced in Article III hereof and incorporated herein as though fully set forth. Contractor shall furnish at its own expense all labor, materials, equipment and services necessary therefor, except such labor, materials, equipment and services as are provided in the Contract Documents to be furnished by City.

This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.

ARTICLE II.

CONTRACT SUM AND PAYMENT
For performing and completing the work in accordance with the Contract Documents, City shall pay Contractor, in full compensation therefor, the contract sum set forth in the Bidding Schedule. Said sum shall constitute payment in full for all work performed hereunder, including, without limitation, all labor, materials, equipment, tools and services used or incorporated in the work, supervision, administration, overhead, expenses and any and all other things required, furnished or incurred for completion of the work as specified in the Contract Documents. City shall make payments to Contractor on account of the contract sum at the time, in the manner, and upon the conditions specified in the Contract Documents.

ARTICLE III.

CONTRACT DOCUMENTS
The Contract Documents, which constitute the entire agreement between the City and the Contractor, are enumerated as follows: Proposal Documents, including the Notice Inviting Bids, Instructions to Bidders, Bidding Schedule, Bidder's Declaration, Designation of Subcontractors, Bidder's Assurance, and Fair Employment Practices documents; this Agreement; Standard Specifications; Special Provisions; Technical Provisions; Drawings; Plans; and all addenda issued prior to and all modifications issued after the execution of this Agreement. These form the Contract, and all are as fully a part of the Contract as if attached to this Agreement or repeated herein.

CD-3
ARTICLE IV.

EFFECTIVE DATE
This Agreement shall become effective and commence as of the date set forth below on which the last of the parties, whether City or Contractor, executes said Agreement.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by their proper officers thereunto duly authorized.

CITY CONTRACTOR

Tasha Cerda, Mayor Name & Title

Date: ______ Sign:_________
Seal: Date:

SECOND SIGNATURE: (Contractor)
___________________________________
Name & Title
ATTEST: Sign:_______________________________
Date:

Mina Semenza, City Clerk

Date:

APPROVED AS TO FORM:

Carmen Vasquez, City Attorney
Date:

CD-4

CONTRACT DOCUMENT
PROJECT NO. JN 530 Phase 1_

FAITHFUL PERFORMANCE BOND
WHEREAS, the City of Gardena has awarded to ,
hereinafter designated as the "Principal", a Contract for:

PROJECT: ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING JN 530
WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract;
NOW, THEREFORE, we,
as Principal, and
as Surety, are held and firmly bound unto the City in the sum of Dollars ($ ), this amount being not
less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In case suit is brought upon this bond, the Surety will pay all court costs and reasonable attorneys’ fees to the City of Gardena in an amount to be fixed by the court.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, well and truly keep and perform all the undertakings, terms, covenants, conditions and agreements in the said Contract and any alteration thereof, made as therein provided, all within the time and in the manner therein designated and in all respects according to their true intent and meaning, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

FURTHER, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849. The City is the principal beneficiary of this bond and has all rights of a party hereto.

CD-5
This bond shall remain in full force and effect for a warranty period of one full year after acceptance of the job by the City.

IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and
Surety named herein, on the day of , 20 , the name
and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body. [PRINCIPAL]
By
Title
Signature
[SURETY]
By
Title
Address
Phone No.

Signature
All signatures must be notarized.

Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.

Corporations must affix corporate seal.

CD-6

CONTRACT DOCUMENT
PROJECT NO. JN 530 Phase 1_

PAYMENT BOND
WHEREAS, the City of Gardena has awarded to , as
Contractor, a contract for the work described as follows:

PROJECT: ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING JN 530
AND WHEREAS, said Contractor is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons, as provided by law;
NOW, THEREFORE, we, the undersigned Contractor and Surety, are held firmly bound unto the City in the sum of
, Dollars ($
) this amount being not less than one hundred percent (100%) of the total Contract price, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if said Contractor, its heirs, executors, administrators, successors, assigns, or subcontractors shall fail to pay any of the persons named in Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, or any other amounts due to persons under any applicable project contract or law, with respect to such work and labor, then the Surety or Sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void.

In case suit is brought upon this bond, the said Surety will pay all court costs and reasonable attorneys’ fees to the plaintiff(s) and City in an amount to be fixed by the court.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 3181 as to give a right of action to such persons or their assigns in any suit brought upon this bond.

Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849.

CD-7
This bond shall remain in full force and effect for six full months after the period in which verified claims may be filed as provided for in Section 3184 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this day of 20 .
[PRINCIPAL]
By
Title
Signature
[SURETY]
By
Title
Address
Phone No.

Signature
All signatures must be notarized.

Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.

Corporations must affix corporate seal.

CD-8

CONTRACT DOCUMENT
PROJECT NO. JN 530 Phase 1_

WORKER'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of the Contract.

DATED:

CONTRACTOR
By
Signature
Title
ATTEST:

By
Signature
Title
CD-9

CONTRACT DOCUMENT
PROJECT NO. JN 530 Phase 1_

INDEMNIFICATION AND HOLD HARMLESS

AGREEMENT AND WAIVER OF SUBROGATION AND

CONTRIBUTION

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING To the fullest extent permitted by law, Indemnitor hereby agrees, at its sole cost and expense, to defend, protect, indemnify, and hold harmless the City of Gardena and its respective elected officials, officers, attorneys, agents, employees, volunteers, successors, and assigns (collectively “Indemnitees”) from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith (collectively “Liabilities”), arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to any act, failure to act, error, or omission of Indemnitor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to the abovereferenced contract, agreement, license, or permit (the “Agreement”) or the performance or failure to perform any term, provision, covenant, or condition of the Agreement, including this indemnity provision. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against an Indemnitee shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. Indemnitor shall pay Indemnitees for any attorney fees and costs incurred in enforcing this indemnification provision. Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a), or (b) the contracting public agency’s active negligence to the limited extent that the underlying Agreement is subject to Civil Code 2782(b). This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under the Agreement or any additional insured endorsements which may extend to Indemnitees.

Indemnitor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees. Accountants, attorneys, or other professionals employed by Indemnitor to defend Indemnitees shall be selected by Indemnitees.

In the event there is more than one person or entity named in the Agreement as an Indemnitor, then all obligations, liabilities, covenants and conditions under this instrument shall be joint and several.
“Indemnitor”
Company/Contractor
Name & Title
Signature & Date
CD-10

CONTRACT DOCUMENT
PROJECT NO. JN 530_Phase 1

INSURANCE

CERTIFICATION OF INSURANCE (COI) SHALL BE SUBMITTED BY THE CONTRACTOR

1. COMMENCEMENT OF WORK. Contractor shall not be authorized to commence Work under this Contract until it has obtained approved insurance. Before beginning Work hereunder, during the entire period of this Contract, for any extensions hereto, and for periods after the end of this Contract as may be indicated below, Contractor must have and maintain in place not less than the insurance coverages required in this Section at his sole cost and expense. Contractor’s insurance shall comply with all items specified by this Contract. Any subcontractors shall be subject to all of the requirements of this Section and Contractor shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Contractor’s insurance may cover all subcontractors.

The insurance requirements are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Contractor under this Contract.

2. INSURANCE COMPANY REQUIREMENTS. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

3. COVERAGES, LIMITS AND POLICY REQUIREMENTS. Contractor shall maintain the types of coverages indicated below:

4. COMPREHENSIVE GENERAL LIABILITY INSURANCE. A policy of comprehensive general liability insurance written on a per occurrence basis in an amount not less than either one million dollars ($1,000,000) per occurrence or two million dollars ($2,000,000) aggregate.

5. COMMERCIAL AUTO LIABILITY INSURANCE. A policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, ed. 12/93, including Symbol 1 (any auto) with no special limitations affecting City. The minimum auto insurance coverage shall be one million dollars ($1,000,000) combined single limit per accident.

6. WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE. A policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars ($1,000,000) per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

In accordance with the provisions of section 1860 of the California Labor Code, Contractor's attention is directed to the requirement that in accordance with the provisions of section 3700 of the California Labor Code, Contractor and every subcontractor will be required to secure the payment of compensation of his or her employees, or obtain a certificate of
CD-11
consent to self-insurance by the Director of Industrial Relations in accordance with the requirements of Section 3700 of the California Labor Code.

In accordance with the provisions of section 1861 of the California Labor Code, Contractor shall sign and file with the awarding body the following certification prior to performing any work on the Project:
"I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."

7. POLICY REQUIREMENTS. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
(i) City and its appointed and elected officers, employees, agents and volunteers shall be added as additional insured to the policy as respects liabilities arising out of the performance of any work done under the Contract.
(ii) The insurer shall agree to provide City with thirty (30) days prior written notice, return receipt requested, of any cancellation, non-renewal or material change in coverage.
(iii) For any claims with respect to the Project covered by this Contract, Contractor’s insurance coverage shall be primary insurance as respects City and its elected and appointed officers, employees, agents and volunteers. Any insurance or self-insurance maintained by City and its elected and appointed officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not contribute with it. (iv) The policy shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company’s liability.

8. COURSE OF CONSTRUCTION INSURANCE. Contractor shall provide course of construction insurance covering for “all risks” of loss in the amount of the completed value of the Work. The City shall be named as a loss payee and the insurer shall waive all rights of subrogation against the City. This policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled until thirty (30) days written notice, return receipt requested, is mailed to the City. Course of Construction Insurance may be provided for each separate Phase.

9. ADDITIONAL REQUIREMENTS. The procuring of required insurance shall not be construed to limit Contractor’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Contract. City shall notify Contractor in writing of changes in the insurance requirements. If Contractor does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Contractor shall be deemed in default hereunder.

CD-12

10.DEDUCTIBLES. Any deductible or self-insured retentions must be declared to and approved by City. Contractor shall guarantee that, at the option of the City, either: the insurer shall eliminate or reduce such deductibles or self-insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Contractor); or Contractor shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses in the amount of any deductibles or self-insured retentions.

11.VERIFICATION OF COMPLIANCE. Contractor shall furnish City with the required endorsements attached hereto. All documents are to be received and approved by City before Work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Contract, Contractor shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefore, or accompanied by other proof of payment satisfactory to City. Contractor shall provide full copies of any requested policies to City within three (3) days of any such request by City.

12.TERMINATION FOR LACK OF REQUIRED COVERAGE. If Contractor, for any reason, fails to have in place, at all times during the term of this Contract, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Contractor’s expense and/or terminate this Contract.

Contractor shall indemnify, defend and hold harmless City and its elected and appointed officers, employees, agents and volunteers from any claim resulting from failure of either Contractor or any subcontractor to take out or maintain any insurance required by this Contract.

13.EQUIPMENT COVERAGE. Any policy or policies of insurance Contractor or his subcontractors elect to carry as insurance against loss or damage to construction equipment and tools or other personal property shall include a provision waiving the insurer’s right of subrogation against City.

GP-1

GENERAL PROVISIONS

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING JN 530
PART 1 – GENERAL PROVISIONS
SECTION 1 – GENERAL
1-1 GENERAL. The Standard Specifications for Public Works Construction (“Greenbook”) written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California shall be the Standard Specifications of the City. All work shall conform to the 2021 edition, including supplements of the Standard Specifications, the Special Provisions which supplement or modify the Standard Specifications, and the Standard Drawings as issued by the City (defined herein as “Agency”) available at the time bids are opened unless otherwise specified in the Contract Documents.

The above referenced Standard Specifications, Special Provisions and Standard Drawings are hereby made a part of the Contract Documents.

For the convenience of the Contractor, the section and subsection numbering system used in these Special Provisions corresponds to that used in the Standard Specifications. 1-2 TERMS AND DEFINITIONS. Whenever in the Standard Specification the following terms are used, they shall be understood to mean and refer to the following:
(a) AGENCY The City of Gardena, a California municipal corporation. (b) BOARD The City Council of the City of Gardena
(c) CONTRACT Documents including but not limited to the proposal forms, DOCUMENTS Standard “Greenbook” Specifications, Special Provisions,
Technical Provisions, Notice Inviting Bids, Instructions to Bidders, Bonds, Insurance, Contract and all Addenda
setting forth any modifications of the documents.
(d) ENGINEER The City of Gardena Director of Public Works/City Engineer or his authorized representative.
(e) BIDDER An individual, co-partnership, association or corporation submitting a proposal for the work contemplated,
acting directly or through a duly authorized
representative.
(f) LEGAL ADDRESS The legal address of the Contractor to be the address OF CONTRACTOR given on the Contractor’s bid and is hereby designated as the place to which all notices, letters or other
communications to the Contractor shall be mailed or
delivered.
(g) LABORATORY An established laboratory approved and authorized by the Engineer for testing materials and work involved in the contract.

GP-2
1-7 AWARD AND EXECUTION OF THE CONTRACT.
1-7.1 General. The proposal shall be fully executed and submitted on the forms provided by the Agency and shall be enclosed in a sealed envelope marked and addressed as directed in the “Notice Inviting Bids”.

If the proposal is made by an individual, it shall be signed and his or her full name and address shall be given; if it is made by a firm it shall be signed with co-partnership name by a general partner thereof, who shall also sign his or her known name, and the name and address of each member of such co-partnership shall be given; if made by a corporation, the name of the corporation shall be signed by its duly authorized officers and attested by the corporate seal.

Bidders are warned against making erasures or alterations of any kind on their Proposal.

Proposals which contain omissions, erasures, alterations, conditions or additions not called for may be rejected.

At the time the Contract is awarded by the Agency, the Contractor shall be licensed under the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California to do the type of work contemplated in the Contract and shall be skilled and regularly engaged in the general class or type of work required by this Contract. 1-7.2 Contract Bonds. The “Performance Bond” is equivalent to City’s “Faithful Performance Bond”.
1-7.3 Examination of Plans, Specifications and Project Site. Bidders shall read the specifications, review the drawings and examine the existing facilities to fully understand the project in order to plan for the improvements as shown in the contract, including local condition, uncertainty of weather and all other contingencies.

Bidders shall satisfy themselves by personal examination of the proposed work sites, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Proposal forms. Information derived from the maps, plans, specifications, profiles, drawings, or from the Engineer/Architect of the record, shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not guaranteed nor is any liability assumed by the Agency.
1-7.4 Interpretation of Drawings and Documents. If a prospective bidder is in doubt as to the true meaning or intent of any part of the Contract Documents including the Specifications, or discovers discrepancies in, or omissions from, the Specifications or Drawings, he may submit to the Engineer a written request for an interpretation or a correction thereof. Interpretations or corrections of the Contract Documents including the Specifications and Drawings, shall be made only by addendum duly issued by the Engineer, and a copy of such addendum will be sent by certified mail, postage prepaid, or delivered to each person receiving a set of the Contract Documents whose address is known to the Engineer and such addendum shall be considered a part of and incorporated in the Contract Documents.
1-7.5 Award of Contract. After the Proposals have been publicly opened and read aloud, they will be checked for accuracy and compliance with all provisions as specified herein.

The Agency reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective GP-3
bids received.

Bids subsequently shown to be mathematically unbalanced would be rejected as nonresponsive.

A mathematically unbalanced bid is one containing lump sum or unit bid items which do not reflect reasonable actual costs plus a reasonable proportionate share of the bidder’s anticipated profit, overhead costs, and other indirect costs, which he/she anticipates for the performance of the items in question.
“A bid is mathematically unbalanced if the bid is structured on the basis of nominal prices for some work and inflated prices for other work; that is, each element of the bid must carry its proportionate share of the total cost of the work plus profits.” “A bid is materially unbalanced if there is a reasonable doubt that award to the bidder submitting the mathematically unbalanced bid will result in the lowest ultimate cost to the Government. Consequently, a materially unbalanced bid may not be accepted.” Award of the Contract, if it be awarded, will ordinarily be made by the Agency within 30 days after opening of the bids. Award will be made to the lowest responsive responsible bidder.

In selecting the lowest responsive responsible bidder, consideration will be given to the general competency of the bidder for the performance of the work covered by the proposal. To receive favorable consideration, a bidder may be required to present evidence that he has successfully performed similar work of comparable magnitude or submit other evidence satisfactory to the Agency that he or his associates are competent to manage the proposed undertaking and to carry it forward to a successful conclusion.

Professional integrity and honesty of purpose shall be essential requirements. A showing of adequate financial resources may be required but will not alone determine whether a bidder is competent to undertake the proposed work.

Only manufacturers or contractors of established reputation, or their duly authorized dealers or agency, having proper facilities for the manufacture of the materials or equipment and for servicing same, or for proper execution of the work called for in the contract, will be considered in making the award.
1-7.6 Execution of Contract. A bidder whose proposal is accepted shall properly sign a written contract with the Agency on the form attached hereto and return said contract together with good and approved bonds and insurance certificates as required by the Contract Documents within twenty-one (21) calendar days from the date of the mailing of a notice from the Agency to the bidder, according to the address given by him, of acceptance of his proposal.

Contract bonds and certificates of insurance, if required, shall be filed in all instances before delivering any equipment, materials, or performing any work under the contract; also before any purchase order shall be issued. An executed Power of Attorney form shall be submitted with all contract bonds herein specified.

If a bidder whose proposal is accepted fails or refuses to enter into a contract as herein provided, or to conform to any stipulated requirement in connection therewith, the money represented by his check or bidder’s bond shall be refunded less the difference between the low bid and the bid of the bidder with whom the Agency enters into an agreement in accordance with the provisions of the Public Contracts Code Section 20174. At the discretion of the Agency, an award may be made to the bidder whose proposal is next most acceptable to the Agency, and such bidder and his surety shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made.

GP-4
A corporation to which an award is made may be required before the contract is finally signed to furnish evidence of its corporate existence, of its right to do business in California and of the authority of the officer signing the contract and bonds for the corporation to so sign. 1-7.7 Return of Proposal and Guarantee. The check or bond of a bidder to whom the contract has been awarded will be returned to him after all of the acts, for the performance of which said security is required, have been fully performed. The checks or bid bonds of the second and third lowest bidders will be returned when the bidder to whom the contract has been awarded has properly executed all of the required Contract Documents. Check or bid bonds of other bidders will be returned when their proposals are rejected or in any event at the expiration of forty-five (45) days from the date of opening bids.
1-7.8 Precedence of Contract Documents. The order of precedence of contract document shall be:

FIRST Requirements of law, including the Code and Ordinances of the City of Gardena.

SECOND Permits from other agencies as may be required by law.

THIRD Permits from City of Gardena Departments as may be required by law or ordinance.

FOURTH The Contract.

FIFTH The Bid Proposal.

SIXTH Addenda.

SEVENTH Notice Inviting Bids.

EIGHTH Instructions to Bidders.

NINTH Technical Provisions.

TENTH Plans.

ELEVENTH General Provisions of the Standard Specifications.

TWELFTH Standard Plans
THIRTEENTH Standard Specifications for Public Works Construction (current edition).

FOURTEENTH Caltrans Standard Plans and Specifications.

FIFTEENTH Reference Specifications.

Change orders, supplemental agreements and approved revisions to Plans and Specifications will take precedence over documents listed above, except those listed as FIRST, SECOND and THIRD. Detailed plans shall have precedence over general plans.

SECTION 2 – SCOPE OF THE WORK
GP-5
2-2 PERMITS. The Contractor will obtain, at no cost to the Agency, all permits necessary to perform the work on streets, highways, railways or other rights-of-ways. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to those permits required for night work, overload, blasting and demolition.

For private contracts, the Contractor shall obtain all permits incidental to the work or made necessary by its operations, and pay all costs incurred by the permit requirements.

The Contractor and each subcontractor employed upon the work must have or obtain a valid City of Gardena Business License in accordance with the provisions of the Gardena Municipal Code.

The project is subject to permit(s) from the Community Development Department.

The permits are ready to be issued and the Contractor is required to pull the applicable project permits (i.e. grading, electrical, mechanical plumbing, building, etc.). The permit costs will be borne by the Contractor.

2.10 DISPUTED WORK.

2.10.1 Retention of Imperfect Work. If any portion of the work done or materials furnished under the contract proves defective or not in accordance with the specifications and contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if the removal of such work is impracticable or will create conditions which are dangerous or undesirable in the opinion of the Engineer, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make deductions therefor in the payment of the contract item due Contractor as may be just and reasonable. 2-11. DISPUTE RESOLUTION.
2-11.1 Requests for Contract Adjustments and Relief. If either Contractor or the Agency believes that it is entitled to relief against the other for any event arising out of or related to the work or Project, such party shall provide written notice to the other party of the basis for its claim for relief. Such notice shall, if possible, be made prior to incurring any cost or expense and in accordance with any specific notice requirements contained in the applicable sections of this Contract.

In the absence of any specific notice requirement, written notice shall be given within a reasonable time, not to exceed fourteen (14) days, after the occurrence giving rise to the claim for relief or after the claiming party reasonably should have recognized the event or condition giving rise to the request, whichever is later. Such notice shall include sufficient information to advise the other party of the circumstances giving rise to the claim for relief, the specific contractual adjustment or relief requested and the basis of such request.
2-11.2 Dispute Avoidance and Resolution. The parties are fully committed to working with each other throughout the Project and agree to communicate regularly with each other at all times so as to avoid or minimize disputes or disagreements. If disputes or disagreements do arise, Contractor and the Agency each commit to resolving such disputes or disagreements in an amicable, professional and expeditious manner so as to avoid unnecessary losses, delays and disruptions to the work under the Contract.

Contractor and the Agency will first attempt to resolve disputes or disagreements at the field level through discussions between Contractor’s Representative and the Engineer.

If a dispute or disagreement cannot be resolved through the Contractor’s Representative GP-6
and the Engineer, Contractor’s Chief Executive Officer or similar senior representative and the Gardena City Manager, or designee, upon the request of the other party, shall meet as soon as conveniently possible, but in no case later than twenty (20) days after such a request is made, to attempt to resolve such dispute or disagreement. Prior to any meeting between the parties’ senior representatives, the parties will exchange relevant information that will assist the parties in resolving their dispute or disagreement.

If, after meeting, the senior representatives determine that the dispute or disagreement cannot be resolved on terms satisfactory to both parties, the parties may submit the dispute to binding or non-binding mediation. The mediation shall be conducted in any manner and by any person or mediation association mutually acceptable to the parties. 2-11.3 Arbitration. Any claims, disputes or controversies between the parties arising out of or relating to the Contract, or the breach thereof, which have not been resolved in accordance with the procedures set forth in Section 2-11.2 above may be decided by binding or non-binding arbitration. The arbitration shall be conducted in any manner and by any person or arbitration association mutually acceptable to the parties. 2-11.4 Claims Disputes. Any claims of Contractor, as “claims” are defined in California Public Contract Code Section 9204 shall be processed in accordance with that section.

Section 9204 provides in relevant part that upon receiving a claim from a contractor, together with reasonable documentation to support the claim, a contracting public entity shall conduct a reasonable review of the claim and, within a period not to exceed 45 days [except as otherwise provided in Section 9204], shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed.

Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, Section 2-11.3 shall apply. If the contractor disputes the public entity’s written response, or if the public entity fails to respond to a claim within the time prescribed, the contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.

Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed.

Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the contractor sharing the associated costs equally. The public entity and contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to other applicable procedures.
2-13 DRAWINGS AND SPECIFICATIONS (“RECORD” DRAWINGS). At all times, the Contractor shall maintain at the project a “Record” set of Drawings and Specifications to include all executed addenda, change orders, and field orders.

GP-7
Prior to each progress payment the Contractor shall deliver to the Engineer, a set of contract drawings with all applicable “as constructed” notes placed/recorded thereon. Failure to provide “as constructed” plans will cause progress payment to be withheld until information is provided to City
After completion of the work and before final payment, the Contractor shall deliver to the Engineer a complete set of contract drawings with all applicable “as constructed” noted placed/record thereon. The final form and detail of these as constructed plans are subject to the acceptance of the Engineer. MARKING REMOVAL. All markings placed by the Contractor, City, and Underground Service Alert (USA) during construction shall be removed at the completion of the work. These markings shall include, but not limited to, paint, stakes, and metal tags.
2-14 MARKING REMOVAL. All markings placed by the Contractor, City, and Underground Service Alert (USA) during construction shall be removed at the completion of the work. These markings shall include, but not limited to, paint, stakes, and metal tags.

All cost associated with removal of markings shall be included in the bid prices for the applicable bid items. Failure of the Contractor to remove these markings shall be cause for the City to do the work and withhold the costs from the Contractor’s final payment.

SECTION 3 – CONTROL OF THE WORK
3-5 INSPECTION. Inspection shall be made once a day for areas ready for inspection.

Areas or items that fail inspection or that are not ready for inspection shall be rescheduled by the contractor.

Inspection of the work shall not relieve the contractor of the obligation to fulfill all conditions and requirements of the contract.
3-6 THE CONTRACTOR’S REPRESENTATIVE. The Contractor shall furnish the Engineer with the name, address and cell/ business/home telephone numbers of the person responsible for the maintenance of barricades, traffic control signs, lights and other safety devices.
3-10 SURVEYING.
3-10.3 Line and Grade. Unless otherwise provided in the Technical Provisions, establishing lines and grades for construction shall be the responsibility of the Contractor, with the following provisions:

All work under this contract shall be built in accordance with the lines and grades shown on the plans. Field survey for establishing these, and for the control of construction, shall be the responsibility of the Contractor. All such surveys, including construction staking, shall be performed on all items ordinarily requiring grade and alignment, at intervals normally accepted by the agencies and trade involved.

The Contractor shall provide a copy of the office calculations and grade sheets to the Agency’s Inspector. The Contractor shall be responsible for any error in the finished work, and shall notify the Engineer within 24 hours of any discrepancies or design errors discovered during staking.

Unless a separate bid item is provided, the payment for surveying, construction staking, GP-8
professional services, office calculations, furnishing all labor, materials, equipment, tools and incidentals, and for doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed therefor. 3-10.4 Permanent Survey Markers. The Contractor is required to locate and tie out survey monuments in the project area prior to construction involving street and highways, or City public right of way and to file with the County Surveyor a Corner Record of any such work. Prior to final payment and the issuance of a completion certificate, the Contractor is required to file a Corner Record for survey monumentation that is replaced.

All such survey work shall be performed under the supervision of a California licensed Land Surveyor or a Civil Engineer authorized to perform such work.

The Contractor shall provide the Agency a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work. The payment for surveying, related professional services, office calculation, furnishing all labor, materials, equipment, tools and incidentals, and for doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed therefor.
3-12 WORK SITE MAINTENANCE.
3-12.1 General. The Contractor shall keep the work site clean and free from rubbish and debris. The Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling with water in keeping with the AQMD and NPDES requirements. Debris, soil or other matter shall not be washed into storm drains but shall be collected and disposed of in a legal, responsible manner. The construction area shall be cleaned with a power sweeper at the end of every workday and when deemed necessary by the Engineer.

The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Use temporary sandbags to control the site perimeter. At the completion of the project sandbags shall become the property of the City of Gardena and shall be remain in place.

The Contractor shall not spill on haul routes. Any such spillage shall be removed immediately and the area cleaned.

Stockpiling of construction materials or debris on City right-of-way shall be in accordance with the NPDES permit and shall be approved by the inspector. At the completion of work, the Contractor shall thoroughly clean all work areas.
3-12.2 Air Pollution and Surface Maintenance Control. The Contractor shall obtain a construction water meter from Golden State Water including required deposit and fees. The Contractor shall pay for the water used, at the current water rates. All arrangements for construction water shall be made by contractor with Golden State Water at Contractor expense.
3-12.4. Storage of Equipment and Material.
3-12.4.1 General. All costs associated with the disposal of all excavated or demolition materials, including any gate fees, shall be paid by the Contractor. These costs shall be included in the bid price for the applicable bid items.

Prior to any excavated or demolition material being removed from the construction site the Contractor shall notify the City as to the hauling route and destination for disposal. If the location for disposal is other than a county landfill then the Contractor shall provide the City with written permission and release of liability for the City from the owner of the property GP-9
where the material will be deposited.

The City has an exclusive agreement with Waste Resources, Inc. and no other firm may provide bulk trash bins in the event the work requires this service. 3-12.4.2 Storage in Public Streets. Construction equipment shall not be stored at the construction site, any public street or publicly owned facilities without approval of the City. Contractor shall store equipment at a contractor’s rental yard.

All excavated material that is to be hauled to and disposed of at a County landfill site by the Contractor is subject to a County gate fee based on tonnage. 3-12.5.4 Protection and Restoration of Existing Improvements. Any facilities, structures, water lines, landscaping, surfaces, signs, pavement markings, painted curbs, house numbers, etc., which are damaged during construction shall be restored to the satisfaction of the City. Damaged water lines shall be repaired immediately at no additional cost to the city.
3-12.5.5 Access to Private Property. The Contractor shall be aware that business and residential access must be maintained at all times. The Contractor shall schedule operations to minimize interference with access to private property.

The main access way to any business or home shall not be completely blocked for more than one four-hour period a day except blockage shall be limited to one twenty-four (24) hour period when concrete is poured.

Temporary access ways shall be provided from the street to the main access way of all businesses and homes by use of traffic rated steel plates or any other method approved by the city.

Payment for this item shall be included in the applicable contract work item. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.3 Warranty. In addition to the guarantees as required in Section 1-7.2 and 3-13.3 of the Standard Specifications, the Faithful Performance Bond shall remain in full force and effect for a period of one year after acceptance of the work by the Agency to insure that defects, which may appear within said period, will be repaired, replaced, or corrected by the Contractor, at his own cost and expense, to the satisfaction of the Engineer within thirty (30) days after written notice thereof by the Agency.

SECTION 4 – CONTROL OF MATERIAL
4-1 GENERAL.
4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier.

The Contractor warrants clear and good title to all materials, supplies and equipment installed and incorporated in the work, and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him to the Agency free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm or corporation furnishing any GP-10
material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon; provided, that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this section, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Agency.

The provisions of this section shall be inserted in all subcontractor’s and material contracts, and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into regarding such materials.

Approved equal products may be submitted for the owner representative’s review and approval. Contractor may request approval from owner to use or substitute products.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBLITIES
5-4 INSURANCE. In lieu of Section 5-4 of the Standard Specifications, refer to the City Contract Documents Section, CD-10, for detail requirements.
5-5 ANTITRUST CLAIMS. By entry into this Contract, Contractor hereby acknowledges the terms of Section 7103.5 of the Public Contract Code and hereby offers and agrees to assign to the Agency all rights, title and interest in all causes of action it may have as outlined above.
5-7 SAFETY.
5-7.4 Hazardous Substances. As required by Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify the Agency of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site;
(2) subsurface or latent physical conditions at the site differing from those indicated by the Agency; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, the Agency shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all work to be performed under the Contract but shall retain all rights provided by the Contract and by law for making protests and resolving the dispute.
5-7.4.1 Edison Energized Conductors. Contractor hereby promises and agrees that in the performance of the work specified in this Contract, it will employ and utilized only qualified persons, as hereinafter defined, to work in proximity to Edison’s secondary, primary and transmission facilities. The term “qualified person” is defined in Title 8, California Administrative Code, Section 2700, as follows:
“Qualified Person: A person who by reason of experience or instruction is familiar with the operation to be performed and the hazards involved.” Contractor further promises and agrees that the provisions of this section shall be and are binding upon any subcontractor or subcontractors that may be retained GP-11
by it, and that Contractor shall take such steps as are necessary to assure compliance by said subcontractor or subcontractors with the requirements of this section.
5-7.4.2 Emergency Provisions. Unusual conditions may arise on the work which will require that immediate and unusual provision be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.

Whenever, in the opinion of the Agency, an emergency exists of which the Agency is aware and against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by the progress of construction; and whenever, in the opinion of the Agency, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the Contract, then in that event the Agency may provide suitable protection to said interests by causing such work to be done and material to be furnished, as in the opinion of the Agency may seem reasonable and necessary, all at the expense of the Contractor.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule. The Contractor’s proposed construction schedule shall be submitted to the Engineer within fourteen (14) calendar days after the date of the contract execution. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.

The Contractor shall include in his bid all costs to perform the work under this contract in stages. The Contractor shall begin and complete work in each stage prior to starting work in subsequent stages unless previous permission is obtained from the Engineer. The contractor shall stage the work to allow parking on the next adjacent streets. Restricting parking on multiple adjoining streets shall require approval of the engineer. 6-1.2 Commencement of the Work. City may establish a Notice to Proceed (NTP) date no later than thirty (30) calendar days after the date of the contract execution. Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods and clarify inspection procedures.

The names, addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Public Works Manager and the County Sheriff’s Department or the City Police Department prior to beginning work.

The Contractor shall also notify the City of Gardena and the owners of all utilities and substructures within the Project area not less than 48 hours prior to starting construction.

The following utility companies list of names and telephone numbers is intended for the convenience of the contractor and is not guaranteed to be complete or correct:

COMPANY CONTACT TELEPHONE NO.

Southern California Edison Manuel Vargas, Jr. 310.783.9389 GP-12
Southern California Gas Melissa Fukunaga: Tech Services Planning: Attn - Lead Planner
213.231.7281
AT&T Marco A. Perez 626.491.5503
Raymond Dover 310.515.4257
Gardena Police Dispatch 310.323.7911
L.A. County Fire Dept. 310.323.7911
Time Warner
Communications Arturo Fernandez 310.750.9099
Crown Castle Hector Aguilera 951.454.5111
Waste Resources of
Gardena
Lorena Rodriguez 310.366.7600
Golden State Water Co. John Mavrakis 562.321.1704
Joseph Salcido 310.660.0320
x101
L.A. County Flood Control Daryll Chenoweth 626.458.3129 L.A. Sanitation District Jon Ganz 562.908.4288
Metropolitan Water District Civil Eng. Substructures Section 213.217.7059 Chevron Pipeline Dave Zerler 310.669.4014
Underground Service Alert 800.422.4133
The Contractor shall submit periodic Progress reports to the Engineer by the tenth day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-1.3 Working Day. The Contractor’s working hours shall be limited to the hours between 7:30 A.M. and 4:30 P.M., Monday through Friday except holidays. No work which will cause loud or disruptive noise to adjacent residents and “No Parking” enforcement shall begin prior to 8:00 a.m. nor terminate later than 4:30 p.m. Deviation from normal working hours will not be allowed unless written permission has been duly obtained beforehand from the office of the City Engineer. The Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and the public, and for proper inspection.

If the Contractor works beyond the allowed working hours without prior written approval from the Engineer, the Contractor may be charged Five Hundred ($500) for each occurrence as required by the Engineer. The amount will be deducted from a progress payment or bond.

Contractor hereby acknowledges and shall be required to comply with the provisions of California Labor Code Section 1810 et seq. According to those sections, eight (8) hours of labor shall constitute a legal day’s work. Contractor shall pay to the Agency a penalty of Twenty-Five Dollars ($25.00) for each worker employed in the execution of this Contract by Contractor, or by any Subcontractor, for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day or forty (40) hours in any one (1) calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

In the event of either a requested or emergency deviation, inspection service fees will be GP-13
charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead and travel time. The service fees will be deducted from any amounts due to the Contractor.
6-1.4 Notice and Service Thereof. Any notice required or given by one party to the other under the contract shall be in writing and shall be dated and signed by the party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:

Notice shall be given to the Agency by personal delivery thereof to the City of Gardena Engineer or by depositing the same in the United States mail enclosed in a sealed envelope, registered and with postage prepaid, addressed to:

Public Works Department
City of Gardena
1717 W. 162nd Street
Gardena, CA 90247-
3778
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the site of the project, or by depositing the same in the United States mail, enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of the work under this Contract, postage prepaid and registered.

Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated to the party giving the notice, postage prepaid and registered.

Notification of Property Owners and Tenants - The Contractor shall notify each property owner and/or tenant in the project area in writing five (5) working days prior to the start of construction. If pedestrian or vehicular access to private property is to be blocked, the Contractor shall again notify each property owner and/or tenant in writing five (5) working days prior to construction activities. The Contractor shall provide additional notices when a lapse time occurs during each phase/segment work.

The written notice shall be submitted to the Engineer for approval prior to being delivered.
6-2 PROSECUTION OF THE WORK.
6-2.1 Contractor’s Responsibility for Work. Until the formal acceptance of the work by the Agency, the Contractor shall have the charge and care thereof and shall, subject to the insurance protection furnished in accordance with the Section 1-7.6 and 5-4 hereof, bear the risk of accident, loss or damage to any part thereof by action of the elements or from any other cause, whether arising from the execution or from the nonexecution of the work. The Contractor shall rebuild, repair, restore and otherwise correct damages to any portion of the work occasioned by any of the above causes before its acceptance.

In case of suspension of work from any cause whatsoever, the Contractor shall be responsible for all materials and the proper temporary storage thereof. 6-1 TIME OF COMPLETION.

GP-14
6-3.1 General. The contract time shall begin per the City’s written notification. Work must be completed within working days specified for the project. In addition, the Contractor shall notify the City 24 hours in advance of the actual commencement of work.

No work shall be undertaken during the City’s holiday closures. It is the Contractor’s responsibility to determine the City’s closure dates.
6-9 LIQUDATED DAMAGES. The amount of liquidated damages is hereby amended to $500 for each consecutive calendar day.

SECTION 7 – MEASUREMENT AND PAYMENT
7-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK.
7-1.2 Method of Measure. The quantities shown on the Bid Schedule are approximate only.

The Contractor will be paid for the actual quantities of work based on approved field measurements as provided for in these Specifications. The City reserves the right to increase or decrease the amount of any item or portion of work to be performed or materials furnished, or to delete any item, in accordance with the Specifications. Additional bid item work shall be completed within the total working days in these specifications. Additional working days maybe allowed with the approval of the engineer.
7-3 PAYMENT.
7-3.2 Partial and Final Payment. The Engineer will authorize monthly partial/progress payments per Section 7-3.2 of the Standard Specifications. Contractor’s monthly invoice shall be submitted on company letterhead. Each invoice submitted shall include: project name, date of invoice, progress payment number, and purchase order number. All bid items shall be included on each invoice and include unit, unit price bid, original quantity, amount, previous payment quantity and amount, current invoice payment quantity and amount, total project payment quantity and amount. In addition, any approved change orders shall be listed on invoice. Payment to Contractor typically takes 30 days from submittal of approved invoice. However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents. 7-3.3 Delivered Materials. The City will NOT honor or make any progress payments for materials ordered and delivered to the job site by the Contractor unless prior approval is obtained from the Engineer.
7-4 PAYMENT FOR EXTRA WORK.
7-4.3 EXTRA WORK. When work is performed on a "time and materials" basis, the following percentages shall be added to the Contractor's cost and shall constitute the markup for all overhead and profits:
1) Labor ................................................................... 20 2) Materials ........................................................... 15 3) Equipment Rental ............................................. 15 4) Other Items and Expenditures ............................ 15 To the sum of the costs and markups provided for in this section, 1 percent shall be added as compensation for bonding.

GP-15
When all or any part of the extra work is performed by a Subcontractor, the markup established above shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

SECTION 8 – FACILITIES FOR AGENCY PERSONNEL
8-2 FIELD OFFICE FACILITIES. The Contractor shall provide the class of field office indicated below:

Class "A" Class "B" Class "C"
In the event none of the boxes are marked above, no specific field office will be required, and the use therefor of any field office will be at the Contractor's discretion. The location of any field office shall be as provided on the plans, in these Specifications or as designated by the Engineer.

END OF GENERAL PROVISIONS

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -

TECHNICAL PROVISIONS

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING JN 530

CONSTRUCTION SPECIFICATIONS INSTITUDE (CSI)
00 00 00-0 – GENERAL
PREFACE: All work and materials shall conform to the CSI Technical Provisions.

Incidental Work - All work and materials required by the plans and specifications, and not specifically listed in the bid schedule items of work, shall be considered incidental and no additional payment shall be made therefore.

Incidental items shall include but are not limited to implementation of the Best Management Practices for the protection of storm drain structures; temporary facilities and controls; contract closeout; tree and landscape preservation; insurance and bonds; all other general provisional items (Section 1 through 8).

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
SECTION 01 33 00 SUBMITTAL

PROCEDURES
PART 1 GENERAL

1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. See Division 1 Section "Contract Closeout " for submitting warranties.

1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Owner’s Representative's responsive action.

B. Informational Submittals: Written information that does not require Owner’s Representative's responsive action.

1.3 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Owner’s Representative reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
b. Confirm that all submittals are complete prior to forwarding to the Owner’s Representative for review.

B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Owner’s Representative's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Owner’s Representative will advise Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittal Review: Allow 15 days for review of each resubmittal.

C. Identification: Each submittal requires a transmittal. Number sequentially according to specification section.

1. Indicate name of firm or entity that prepared each submittal.

2. Provide a space to record Contractor's review and approval markings and action taken by Owner’s Representative.

3. Include the following information on the transmittal for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Architect.
d. Name and address of Contractor.
e. Name and address of subcontractor.
f. Name and address of supplier.
g. Name of manufacturer.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
h. Submittal number or other unique identifier, including revision identifier. 1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06 10 00.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06 10 00.01.A).
i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Location(s) where product is to be installed, as appropriate. l. Other necessary identification.

D. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract Documents on submittals.

E. Substitutions: Provide documentation per Submittal Section 1.3 including reason for substitution, including manufacturer information to determine if product meets “or equal” qualification.

F. Additional Copies: Unless additional copies are required for final submittal, and unless Owner’s Representative observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

G. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form.

H. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

J. Use for Construction: Use only final submittals with mark indicating Owner’s Representative’s response.

1.4 CONTRACTOR'S USE OF ARCHITECT'S CAD FILES
A. General: At Contractor's written request, copies of Architect's CAD files will be provided to Contractor for Contractor's use in connection with Project, subject to the following conditions:

1. The Architect will draft a letter limiting liability and use, requiring the (sub) contractor’s signature of compliance.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification Sections.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, to supplement Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
e. Wiring diagrams showing factory-installed wiring.
f. Printed performance curves.
g. Operational range diagrams.
h. Compliance with specified referenced standards.
i. Testing by recognized testing agency.

4. All submittals will be processed electronically through the City’s on-line system – e2020. Contractor(s) and designer(s) will receive training during the preconstruction meeting. Submittals received from sources other than contractor may be returned without action.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring. f. Shop work manufacturing instructions.
g. Templates and patterns.
h. Schedules.
i. Notation of coordination requirements.
j. Notation of dimensions established by field measurement. k. Relationship to adjoining construction clearly indicated. l. Seal and signature of professional engineer if specified. m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 24 x 36” inches.

3. Drawings shall be submitted through the City electronic portal submittal system ( e2020).

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:
a. Generic description of Sample.
b. Product name and name of manufacturer.
c. Sample source.
d. Number and title of appropriate Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
each set.

4. Samples for Initial Selection: Submit manufacturer's color samples consisting of units or sections of units showing the full range of colors, textures, and patterns available. Printed charts are not acceptable. a. Number of Samples: Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Owner’s Representative will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.
a. Number of Samples: Submit three sets of samples. Owner’s Representative will retain one sample set; remainder will be returned.

E. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design.

1. Number of Copies: Submit three copies of subcontractor list, unless otherwise indicated. Owner’s Representative will return two copies.

2.2 INFORMATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by other Specification Section

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. Owner’s Representative will not return copies. If using e2020, only PDF’s are necessary.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements specified in Division 1 Section 01 40 50 "Testing and Inspection."

4. Maintenance and Operations Manuals.

5. Guarantees and Warrantees.

B. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

C. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms.

Include names of firms and personnel certified.

D. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

E. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

F. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

I. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

J. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

K. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

L. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

M. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

N. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements specified in Division 1 Section "Operation and Maintenance Data." O. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations.

P. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

Q. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections. Include the following, as applicable:

1. Statement on condition of substrates and their acceptability for installation of product.

2. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

3. Results of operational and other tests and a statement of whether observed performance complies with requirements.

R. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage.

S. Material Safety Data Sheets (MSDSs): Submit information directly to Owner; do not submit to Owner’s Representative.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW
A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Owner’s Representative.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -

3.2 ARCHITECT'S ACTION
A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it.

Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken.

C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

D. Partial submittals are not acceptable, will be considered non responsive, and will be returned without review.

E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

PART 4 – “RECORDS” PRINTS

4.1 RECORD PRINTS
A. Changes: Record accurately on full size prints all changes in the Work constituting departures from the original Contract Plans. For example, changes in pressure and non-pressure irrigation line locations.

B. Legibility and Approval: The changes and dimensions shall be recorded in a legible and workmanlike manner to the satisfaction of the Owner. Prior to processing final payment application of the Work, submit "record" prints to the Owner’s Representative for approval.

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL

1.1 SUMMARY
A. The General Conditions and Division1 are a part of this Section and the Contract for this Work and apply to this Section as if repeated fully herein.

B. This Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

1.2 USE CHARGES
A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum. Allow other entities to use temporary services and facilities without cost, including, but not limited to Owner, Owner͛s Representative, testing agencies, and authorities having jurisdiction.

B. Water Service: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

C. Electric Power Service: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

1.3 SUBMITTALS
A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel.

1.4 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.

1.5 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.

PART 2 PRODUCTS

2.1 MATERIALS
A. Pavement: Comply with Divisions 03 & 32.

B. Portable Chain-Link Project Fencing: Minimum 2-inch (50-mm), 9-gage, galvanized steel, chain-link fabric fencing; minimum 6 feet (1.8 m) high with galvanized steel pipe posts; minimum 2-3/8-inch- (60-mm-) OD line posts and 2-7/8-inch-
(73-mm-) OD corner and pull posts, with 1-5/8-inch- (42-mm-) OD top and bottom rails. Provide galvanized steel bases for supporting posts.

C. Windscreen: Provide 85% green opacity construction windscreen within limits of construction.

2.2 TEMPORARY FACILITIES
A. Sanitary Facilities for Construction Personnel: Provide temporary toilets, wash facilities, and drinking water for

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
use of construction personnel. Comply with authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.

B. Sanitary Facilities for Public: For the entire duration of construction, provide one (1) ADA accessible temporary toilets, locked at the end of each work day that includes wash sinks for contractor use. Toilets are to be serviced and emptied at least twice a week. Do not allow the toilets to overflow at any time. Contractor is responsible in maintaining these toilets.

C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations. This shall be located within the contractor’s staging area at parking lot.

PART 3 EXECUTION

3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction.

C. Water Service: Use of Owner's existing water service facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

1. Where installations below an outlet might be damaged by spillage or leakage, provide a drip pan of suitable size to minimize water damage. Drain accumulated water promptly from pans.

D. Electric Power Service: Use of Owner's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to Owner.

E. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations.

1. Connect temporary service to Owner's existing power source, as directed by Owner.

3.3 SUPPORT FACILITIES INSTALLATION
A. Parking: Use designated areas of Owner's existing parking areas for construction personnel.

B. Project Identification and Temporary Signs: Provide Project identification. Install sign to inform public and individuals seeking entrance to Project. Unauthorized signs are not permitted. Indicate name of project, owner, contractor and Owner͛s Representative. Sign configuration, wording and color are to be approved by City.

C. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Waste shall be removed at least twice per week.

D. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -
not temporary facilities.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to adjacent properties and walkways, according to requirements of authorities having jurisdiction. Maintain throughout all phases of the project.

C. Stormwater Control: Comply with authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.

D. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage, flooding, and erosion. See Section 32 34 01 Tree and Landscape Preservation for more information.

E. Site Enclosure Fence: Before construction operations begin, furnish and install site enclosure fence in a manner that will prevent people and animals from easily entering site except by entrance gate. Maintain in place throughout the construction period.

1. Extent of Fence: As required to enclose entire Project site or portion determined sufficient to accommodate construction operations and public access for non-construction zones.

2. Contractor shall maintain temporary fencing in good condition. Damaged sections due to vandalism and / or graffiti shall be repaired or replaced within 72- hours of occurrence.

3. Maintain security by limiting number of keys and restricting distribution to authorized personnel.

Provide Owner and local fire authority with one set of keys each for each gate.

F. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Orange plastic security fencing is considered insufficient.

G. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

H. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.

I. Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA 241.

1. Prohibit smoking in anywhere on-site.

2. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of authorities having jurisdiction.

3. Develop and supervise an overall fire-prevention and -protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.

J. Music – Music is not allowed on site.

K. Foul Language: Foul language is not allowed on site. Violator will be removed from site.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TEMPORARY FACILITIES AND CONTROLS 01 50 00 -

3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.

C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are property of Contractor. Owner reserves right to take possession of Project identification signs.

2. At Substantial Completion, clean and renovate permanent facilities used during construction period.

Comply with final cleaning requirements specified in Division 1 Section "Closeout Procedures."

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONTRACT CLOSEOUT 01 70 00-1
SECTION 01 70 00

CONTRACT CLOSEOUT
PART 1 GENERAL

1.1 SUMMARY
A. Section Includes: Activities and procedures for closing out the Contract and assisting in Owner's final inspection.

B. Related Documents: The General Conditions and Division 1 are a part of this Section and the Contract for this Work and apply to this Section as if repeated fully herein.

1.2 REQUIREMENTS PREPARATORY TO FINAL INSPECTION
A. Remove temporary facilities from the site to City satisfaction.

B. Thoroughly clean the court surfaces and site to City satisfaction.

C. All electrical equipment shall be fully operational to the satisfaction of the city.

D. Properly mount all operating instructions for equipment and post as specified in their respective sections.

E. Job Record specifications and prints shall be completed, signed, and submitted to the Owner’s Representative as specified herein.

F. Submit to the Owner’s Representative, the material and equipment maintenance instructions, as specified in the body of the Specifications. Schedule meeting with Owner’s representative to train in event training on equipment is necessary.

G. Submit to the Owner’s Representative, all guarantees, and warranties as specified in the General Conditions.

H. When requested, submit certificates indicating payment of all debts and Claims arising from the Work.

I. Deliver all tools which a permanent part of equipment are installed in the Work to the Owner.

J. Deliver all keys, construction and permanent, properly identified, to the Owner.

1.3 FINAL INSPECTION
A. After all requirements preparatory to the final inspection have been completed as herein specified, notify the Owner’s Representative and Owner's Inspector to perform the final inspection.

1.4 RECORD SPECIFICATIONS AND PRINTS
A. Maintain a set of Record Specifications and Prints as required by Specification Section 017200 Project Record Documents. Record set to be reviewed and approved as requested by City on an as needed basis.

1.5 OPERATION AND MAINTENANCE DATA SUBMITTAL:

A. Submit to the Owner for approval, five copies of complete operation and maintenance data as specified herein and in other sections of these specifications. Submit data a minimum of 30 days before completion of the Contract. The Contract will not be considered complete until this data has been reviewed and approved by the Owner.

B. Assemble all data required herein, except that to be mounted in frames, in three-ring loose-leaf binders, complete with index, index dividers, and permanently attached exterior label on cover.

C. Data Required:

1. Manufacturer's Manuals: Submit complete installation, operation, maintenance and service manuals, and printed instructions and parts lists for all materials and equipment where such printed matter is regularly

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONTRACT CLOSEOUT 01 70 00-2
available from the manufacturer. This includes but is not limited to such service manuals as may be sold by the manufacturer covering the operation and maintenance of his items, and complete replacement parts lists sufficiently detailed for parts replacement ordering to manufacturer. Bound publications need not be assembled in binders.

2. Equipment Nameplate Data: Submit a typewritten list of all mechanical and electrical equipment showing exact equipment nameplate data. Identify equipment by means of names, symbols, and numbers used in the contract documents.

3. System Operating Instructions: Submit typewritten instructions covering operation of the entire system as installed (not duplicating manufacturer͛s instructions for operating individual components). Include schematic and control diagrams as appropriate and show or list electrical components using identification symbols and numbers.

4. System Maintenance Instructions: Submit typewritten instructions covering routine maintenance of system. List each item of equipment requiring inspection, or service and briefly describe such maintenance, and frequency of service. It is not intended that these instructions duplicate manufacturer's detailed instructions. Give name, address and phone number of nearest firms authorized or qualified to service equipment or provide parts.

5. Wall Mounted Data: Frame one set of typewritten system instructions and diagrams as specified above, covered with glass and mounted in locations as directed by the Owner. This set of instructions is in addition to the five required herein.

1.6 INSTRUCTION OF OWNER'S MAINTENANCE PERSONNEL:

A. Instructions from manufacturer's representatives required under other sections of this specification shall be conducted during this period. Do not conduct this instruction period before completion of conduit and equipment labeling required.

B. Make arrangements and notices for operation and instruction periods through the Owner.

C. This three-day instruction period shall be in addition and subsequent to any period of operation, test and adjustment called for elsewhere in this specification.

1.7 MANUFACTURERS' WARRANTIES
A. Deliver all manufacturers' warranties required by the Contract Documents, with Owner named as the beneficiary.

In addition, for all equipment and machinery, or components thereof, bearing a manufacturers' warranty that extends for a longer time period than the Contractor's warranty, secure and deliver the manufacturers' warranties in the same manner. Warranty periods shall begin with City’s filing of Notice of Completion with County.

B. Form of Warranty: Submit written warranties, except manufacturers' standard printed warranties, on the Contractor's, subcontractor's, material suppliers', or manufacturer's own letterhead, addressed to the Owner.

Submit all warranties in duplicate, and in the form shown on the following page, modified as approved to suit the conditions pertaining to the warranty.

C. Submission of Warranties: Collect and assemble all written warranties into a bound booklet form and deliver them to the Owner for final review and approval.

D. Warranty Periods: Warranty periods shall begin with the City’s filing of Notice of Completion with County.

PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
DEMOLITION 02 41 00 -1
SECTION 02 41 00

DEMOLITION
PART 1 GENERAL

1.1 SUMMARY
A. The General Conditions and Division 1 are a part of this Section and the Contract for this Work and apply to this Section as if repeated fully herein.

1. This Section includes the following:
a. Site element demolition.
b. Salvage of existing items to be reused.

2. Removal of existing utilities.

1.2 RELATED DOCUMENTS
A. Section 01 10 00 - Summary: Limitations on Contractor's use of site and premises.

B. Section 01 50 00 - Temporary Facilities and Controls: Site fences, security, protective barriers, and waste removal.

C. Section 01 60 00 - Material and Equipment: Handling and storage of items removed for salvage and relocation.

D. Section 01 70 00 Contract Closeout Requirements: Project conditions; protection of benchmarks, survey control points, and existing construction to remain; reinstallation of removed products; temporary bracing and shoring.

E. Section 02 41 03 Site Demolition.

F. Section 01 73 00 Execution
G. Section 31 10 00 - Site Clearing: Vegetation and existing debris removal.

H. Section 32 34 01 Tree Protection

1.3 REFERENCE STANDARDS
A. 29 CFR 1926 - U.S. Occupational Safety and Health Standards; current edition.

B. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations; 2013.

1.4 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse.

C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled. These items shall be protected from damage and repaired or replaced as directed by the owner if damage does occur.

1.5 SUBMITTALS
A. Schedule of Demolition Activities - Indicate the following:

1. Detailed sequence of demolition and removal work,

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
DEMOLITION 02 41 00 -2
B. Site Plan: Showing:

1. Vegetation to be protected.

2. Areas for temporary construction and field offices, if applicable.

3. Irrigation and turf repair shall be in accordance with Drawings.

C. Project Record Documents: Accurately record actual locations of capped and active utilities and subsurface construction.

PART 2 PRODUCTS -- NOT USED
PART 3 EXECUTION

3.1 SCOPE
A. Remove existing paving and curbs indicated on drawings, and as required to accomplish new work.

B. Remove other items indicated, for salvage.

3.2 GENERAL PROCEDURES AND PROJECT CONDITIONS
A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Obtain required permits and licenses to legally complete all work.

2. Comply with applicable requirements of NFPA 241.

3. Use of explosives is not permitted.

4. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.

5. Provide, erect, and maintain temporary barriers and security devices.

6. Use physical barriers to prevent access to areas that could be hazardous to workers or the public.

7. Conduct operations to minimize effects on and interference with adjacent structures and occupants.

8. Do not close or obstruct roadways, trails, entrances / exits, or sidewalks without permit.

9. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations.

10. Obtain written permission from owners of adjacent properties when demolition equipment will traverse, infringe upon or limit access to their property.

B. Do not begin removal until receipt of notification to proceed from Owner.

C. Minimize production of dust due to demolition operations; do not use water if that will result in ice, flooding, sedimentation of public waterways or storm sewers, or other pollution.

D. Hazardous Materials: Comply with 29 CFR 1926 and state and local regulations.

E. Perform demolition in a manner that maximizes salvage and recycling of materials.

1. Dismantle existing construction and separate materials.

F. Coordinate demolition for the correct sequence, limits, and methods. Schedule demolition work to create the least possible inconvenience to the public and facility operations.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
DEMOLITION 02 41 00 -3
G. Contractor is required to take photos documentation of existing pavements conditions, lighting, permanent structures, and other site conditions prior to start of work. Photos shall be dated and submitted to the City. Note: If field conditions encountered vary from what is indicated on the Plans, promptly notify the City and Architect for clarification before proceeding.

1. Contractor shall notify the Owner’s representative prior to start of Demolition to allow Owner to identify items to be salvaged.

2. Set aside reusable, recyclable, and salvageable materials; store and deliver to collection point or point of reuse.

H. Partial Removal of Paving and Curbs: Neatly saw cut at right angle to surface.

3.3 EXISTING UTILITIES
A. Coordinate work with utility companies; notify before starting work and comply with their requirements; obtain required permits.

B. Protect existing utilities to remain from damage. All known underground utilities are noted on the Plans and are shown in approximate locations. Contractor to pothole and locate all utilities prior to start of demolition.

C. Do not disrupt public utilities without permit from authority having jurisdiction.

D. Do not close, shut off, or disrupt existing life safety systems that are in use without at least 7 days prior written notification to Owner.

E. Do not close, shut off, or disrupt existing utility branches or take-offs that are in use without at least 3 days prior written notification to Owner.

F. Locate and mark utilities to remain; mark using highly visible tags or flags, with identification of utility type; protect from damage due to subsequent construction, using substantial barricades if necessary.

G. Remove exposed piping, valves, meters, equipment, supports, and foundations of disconnected and abandoned utilities.

3.4 PREPARATION
A. Drain, purge, or otherwise remove, collect, and dispose of chemicals, gases, explosives, acids, flammables, or other dangerous materials in conformance with all applicable codes before proceeding with demolition operations.

B. Conduct demolition operations and remove debris to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.

C. Conduct demolition operations to prevent injury to people and damage to adjacent buildings and facilities to remain.

Ensure safe passage of people around demolition area.

D. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.

E. Protect existing site improvements, appurtenances, and landscaping to remain.

1. Erect a plainly visible 6-foot chain link fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.

2. See Section 32 34 01 Tree and Landscape preservation for additional direction and information.

3.5 CUTTING EXISTING CONCRETE AND ASPHALT
A. Cutting of existing concrete shall be done by experienced workers familiar with the requirements and space

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
DEMOLITION 02 41 00 -4
necessary for placing concrete. Perform concrete cutting with concrete cutting wheels and hand chisels. Take care not to damage concrete that is intended to remain.

B. Extent of cutting of concrete shall be as indicated on drawings and in accordance with standard plans for public works construction plan no. 132-1. Replace concrete that is removed in excess of amount indicated or required.

C. Prior to cutting or coring concrete, determine locations of hidden utilities and take necessary measures to protect them from damage.

D. If an existing pavement joint or cracked area is within two feet outside of a designated sawcut line shown on the Drawings, removal and resurfacing shall be to that joint, and/or shall include the crack or cracked area, unless otherwise approved by Architect.

E. All concrete shall be power washed and final condition approved by Owner͛s representative.

3.6 EXPLOSIVES
A. Explosives: Use of explosives will not be permitted.

3.7 POLLUTION CONTROLS
A. Dust shall be kept at a minimum during this work. Use water mist, temporary enclosures, and other suitable methods to limit the spread of dust and dirt. Comply with governing environmental protection regulations.

1. Do not create hazardous or objectionable conditions, such as ice, flooding, and pollution, when using water.

B. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

1. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level.

C. Clean adjacent buildings, sidewalks and/or roadways, and improvements of dust, dirt, and debris caused by demolition operations. Return adjacent areas to existing condition before start of demolition.

3.8 DEBRIS AND WASTE REMOVAL
A. Legally remove debris, junk, and trash from site at the end of each day.

B. Remove from site all materials not to be reused on site; do not burn or bury.

C. Leave site in clean condition, ready for subsequent day͛s work.

D. Clean up spillage and wind-blown debris from public and private lands.

3.9 PROTECTION:

A. Do not commence demolition until fencing, safety partitions, barricades, warning signs, and other forms of protection are installed.

B. Provide all safeguards, including warning signs, lights, barricades, for the protection of workers, occupants, the public and trees.

C. All existing oak trees shall be protected. Extreme caution shall be exercised while working around / under the trees and canopies.

D. Any damage to site features that are identified to be protected in place shall be repaired or replaced at no additional cost to the Owner / City. Refer to Section 32 43 01 Tree and Landscape Protection for additional requirements.

E. Protect existing improvements during demolition and cleaning operations.

F. Work area(s) shall be kept “broom clean” and washed / cleared daily.

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONCRETE FORMING AND ACCESSORIES 03 10 00 -1
SECTION 03 10 00

CONCRETE FORMING AND ACCESSORIES
PART 1 GENERAL

1.1 SUMMARY
A. Provisions of Division 01 apply to this section
B. Section Includes:

1. Formwork for cast-in-place concrete as indicated.

2. Installation of items to be embedded in concrete, such as anchor bolts, inserts, embeds, and sleeves C. Related Sections:

1. Section 014050: Testing and Inspection.

2. Section 032000: Concrete Reinforcement.

3. Section 033000: Cast-In-Place Concrete.

1.2 SYSTEM DESCRIPTION
A. Regulatory Requirements: Except as otherwise specified herein, Work of this section shall be in accordance with CBC, Chapter 19, Concrete.

1.3 SUBMITTALS
A. Shop Drawings: Submit Shop Drawings indicating locations of forms, joints, embedded items, and accessories.

B. Product Data: Submit manufacturer's Product Data for form materials and accessories.

1.4 QUALITY ASSURANCE
A. Comply with the following as a minimum requirement:

1. Conform to ACI 347, Chapter 1: Design and Chapter 3: Materials for Formwork.

2. Conform to ACI 301, “Specifications for Structural Concrete for Buildings”, as applicable, unless exceeded by code requirements or otherwise indicated or specified.

3. Plywood: Conform to tables for form design and strength in APA Form V 345 B. Mock-ups: Provide mock-ups for architectural exposed finishes; 100 square feet minimum size. Locate as required by the Architect.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials for forms in timely manner to ensure uninterrupted progress.

B. Store materials by methods that prevent damage and permit ready access for inspection and identification.

PART 2 PRODUCTS

2.1 GENERAL
A. Form materials may be reused during progress of the Work provided they are completely cleaned and reconditioned, recoated for each use, capable of producing formwork of required quality, and are structurally sound.

B. Form Lumber: WCLIB Construction Grade or Better, WWPA No. 1 or Better.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONCRETE FORMING AND ACCESSORIES 03 10 00 -2
C. Plywood: PS 1-95, Group I, Exterior Grade B-B Plyform or better, minimum 5-ply and 3/4-inch-thick for exposed locations and at least 5/8-inch-thick for unexposed locations, grade marked, not mill oiled. Furnished plywood with medium or high-density overlay is permitted.

D. Coated Form Plywood: For exposed painted concrete, plastic overlaid plywood of grade specified above, factory coated with a form coating and release agent Noxcrete", or equal.

E. Tube Forms: Burke "SmoothTube,” Sonoco "Seamless Sonotubes,” or Alton Building Products "Sleek Seamless Standard Wall,” of the type leaving no marks in concrete, one-piece lengths for required heights.

F. Joist Forms: Code recognized steel or molded plastic types as required.

G. Special Forms: For exposed integrally-colored concrete, plywood as above with high density overlay, plywood with integral structural hardboard facing or fibrous glass reinforced plastic facing, providing specified finish.

H. For Exposed Concrete Finish:

1. Plywood: New, waterproof, synthetic resin bonded, exterior type Douglas fir or Southern pine plywood manufactured especially for concrete formwork and conforming to NIST PS 1, BB grade, class I.

2. Glass-Fiber-Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to structural tolerances and appearance of finished concrete surfaces.

3. Steel: Minimum 16 gage sheet, well matched, tight fitting, stiffened to support weight of concrete, without deflection detrimental to tolerances and appearances of finished concrete surfaces.

4. Wood Board Form Finish: Use new rough sawn cedar boards (6͟wide) as liner to establish ͞board form finish͟.

I. Form Ties: Concealed condition: Prefabricated rod, flat band, wire, internally threaded disconnecting type, not leaving metal within 1-1/2 inch of concrete surface, free of defects that could leave holes larger than one inch in concrete surface. Exposed condition: Snap-off type, fixed length, cone type, 1-inch back break dimension, free of defects that could leave holes larger than one inch in concrete surface; provide flush plugs for cone holes or grout fill as specified.

J. Form Coating: Non-staining clear coating free from oil, silicone, wax, not grain-raising, "Formshield" by A.C.

Horn, Inc., "Release" by Burke Concrete Accessories, or "Cast-Off" by Sonneborn Building Products. Where form liners are furnished, provide form coatings recommended by form liner manufacturer.

K. Form Liner: Rigid or resilient type by L.M. Scofield, Labrado Forms, Symons, or Greenstreak.

L. Void Forms: Manufactured by SureVoid Products, Inc, or equal. Forms shall be "WallVoid" for temporary support of concrete walls and grade beams spanning between supports, and "SlabVoid" for creating gaps between concrete slabs or steps and underlying soils. Void forms shall be fabricated of corrugated paper with moisture resistant exterior, and shall be capable of withstanding working load of 1,500 psf. Provide accessories as required.

PART 3 EXECUTION

3.1 GENERAL
A. Forms shall be constructed so as to shape final concrete structure conforming to shape, lines and dimensions of members required by Drawings and Specifications and shall be sufficiently tight to prevent leakage of mortar.

They shall be properly braced or tied together to maintain position and shape. Forms and their supports shall be designed so that previously placed structures will not be damaged. Forms shall be true to line within a tolerance of plus-or-minus 1/250 of the span.

3.2 ERECTION
A. Plywood shall be installed with horizontal joints level, vertical joints plumb and with joints tight. Back joints by studs or solid blocking, and fill where necessary for smoothness. Reused plywood shall be thoroughly cleaned,

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONCRETE FORMING AND ACCESSORIES 03 10 00 -3
damaged edges or surfaces repaired, and both sides and edges oiled with colorless form oil. Nail plywood along edges, and to intermediate supports, with common wire nails spaced as necessary to maintain alignment and prevent warping.

B. Openings for Cleaning: Provide temporary openings at points in formwork to facilitate cleaning and inspection.

At base of walls and wide piers, bottom form board on one face for entire length shall be omitted until form has been cleaned and inspected.

3.3 REMOVAL OF FORMS
A. Forms shall not be removed until concrete has sufficiently hydrated to maintain its integrity and not be damaged by form removal operations. Unless noted otherwise and/or permitted by the Architect, columns and wall forms shall not be removed in less than 5 days, floor slabs in less than 7 days, beams and girders in less than 15 days, metal pan forms for joists may be removed after 3 days, but joist centering shall not be removed until after 15 days, and ramp, landing, steps and floor slabs shall not be removed in less than 7 days. Shoring shall not be removed until member has acquired sufficient strength to support its weight, load upon it, and added load of construction.

B. Compressive strength of in-place concrete shall be determined by testing field-cured specimens͛ representative of concrete location or members, as specified in Section 033000: Cast-In-Place Concrete.

3.4 PROTECTION
A. Protect the Work of this section until Substantial Completion.

3.5 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONCRETE REINFORCING 03 20 00 -1
SECTION 03 20 00

CONCRETE REINFORCING
PART 1 GENERAL

1.1 SUMMARY
A. Section Includes:

1. Concrete steel reinforcement.

2. Accessories, including but not limited to, chairs and tie wires.

B. Related Sections:

1. Section 014050: Testing and Inspection.

2. Section 033000: Cast-In-Place Concrete.

3. Section 042200: Concrete Masonry Units

4. Section 321313: Portland Cement Concrete

1.2 SYSTEM DESCRIPTION
A. Regulatory Requirements: Fabrication and placement of reinforcing shall be in accordance with requirements of CBC, Chapter 19.

1.3 SUBMITTALS
A. Shop Drawings: Submit steel reinforcement Shop Drawings in accordance with ACI 315. Include assembly diagrams, bending charts and slab plans. Indicate lengths and location of splices, size and lengths of reinforcing steel.

B. Closeout Submittals: Record exact locations of reinforcing that vary from Shop Drawings.

1.4 QUALITY ASSURANCE
A. Comply with the following as a minimum requirement:

1. Concrete Reinforcing Steel Institute (CRSI) Manual of Standard Practice.

2. American Welding Society (AWS).

3. American Concrete Institute (ACI).

4. CBC, Chapter 19, Concrete.

B. Source Quality Control: Refer to Division 01 Sections for general requirements and to following paragraphs for specific procedures. Testing laboratory retained by the Owner shall perform following conformance testing, select test Samples of bars, ties, and stirrups from the material at the Project site or from the place of distribution, with each Sample consisting of not less than two 18-inch-long pieces, and perform the following tests according to ASTM A 615.

1. Identified Bars: If Samples are obtained from bundles as delivered from the mill, identified as to heat number, accompanied by mill analyses and mill test reports, and properly tagged with the identification certificate so as to be readily identified, perform one tensile and one bend test for each 10 tons or fraction thereof of each size of bars. Submit mill reports when Samples are selected.

2. Unidentified Bars: When positive identification of reinforcing bars cannot be performed and when random Samples are obtained; perform tests for each 2.5 tons or fraction thereof, one tensile and one bend test from each size of bars.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONCRETE REINFORCING 03 20 00 -2
C. Certification of welders: Shop and Project site welding shall be performed by certified welding operators.

1.5 DELIVERY, STORAGE, HANDLING AND MARKING
A. Avoid exposure to dirt, moisture or conditions harmful to reinforcing.

B. Reinforcing steel bars, wire, and wire fabric shall be stored on the Project site to permit easy access for examination and identification of each shipment. Material of each shipment shall be separated for size and shape
C. Bundle bars, tag with identification and transport and store so as not to damage any material. Use metal tags indicating size, length and other marking shown on placement drawings. Maintain tags after bundles are broken.

PART 2 PRODUCTS

2.1 GENERAL
A. Provide reinforcing of sizes, gages and lengths indicated, bent to indicated shapes.

2.2 MATERIALS
A. Steel Reinforcing Bars: ASTM A 615, or ASTM A 706 deformed grade 60 billet steel unless otherwise specified or indicated.

B. Steel Reinforcing Bars for welding: ASTM A 706 deformed grade 60.

C. Bars or Rod Mats: ASTM A 184.

D. Tie Wire: ASTM A 82, fully annealed, copper-bearing steel wire, 16 gages minimum.

E. Chairs, Spacers, Supports, and Other Accessories: Standard manufacture conforming to ACI-315 fabricated from steel wire of required types and sizes. For reinforcement supported from grade, provide properly sized dense precast blocks of concrete.

F. Welding electrodes: AWS D1.4, Table 5.1 and 5.5 low hydrogen electrodes, E9018 for Grade 60 steel.

2.3 FABRICATION OF REINFORCING BARS:

A. Comply with CRSI Manual of Standard Practice for Reinforced Concrete Construction for fabrication of reinforcing steel.

B. Bending and Forming: Fabricate bars of the indicated sizes and bend and form to required shapes and lengths by methods not injurious to materials. Do not heat reinforcement for bending. Bend bars No. 6 size and larger in the shop only. Bars with unscheduled kinks or bends are not permitted. Provide only tested and permitted bar materials.

C. Welding: Provide only ASTM A 706 steel where welding is indicated. Perform welding by the direct electric arc process in accordance with AWS D1.4 and specified low-hydrogen electrodes. Preheat 6 inches each side of joint. Protect joints from drafts during the cooling process; accelerated cooling is not permitted. Do not tack weld bars. Clean metal surfaces to be welded of loose scale and foreign material. Clean welds each time electrode is changed and chip burned edges before placing welds. When wire brushed, the completed welds must exhibit uniform section, smooth welded metal, feather edges without undercuts or overlays, freedom from porosity and clinkers, and good fusion and penetration into the base metal. Cut out welds or parts of welds deemed defective, using chisel, and replace with proper welding. Prequalification of welds shall be in accordance with CBC requirements.

PART 3 EXECUTION

3.1 INSTALLATION
A. Bars shall be bent cold. Bars partially embedded in concrete shall not be field bent except as indicated on reviewed Shop Drawings. Before installation, clean reinforcing of loose scale, rust, oil, dirt and any coating that

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CONCRETE REINFORCING 03 20 00 -3
could reduce bond.

B. Accurately position, install, and secure reinforcing and wire tie to prevent displacement during the placement of concrete. Bend ends of wire ties away from the forms. Wire tie bars to corners of ties and stirrups.

C. Provide metal chairs to hold reinforcement the required distance above form bottoms. In beams and slab construction, provide chairs under top slab reinforcement as well as under bottom reinforcement. Space chairs so that reinforcement will not be displaced during installation. Provide metal spacers to secure proper spacing.

Stirrups shall be accurately and securely wired to bars at both top and bottom. At slabs, footings, and beams in contact with earth, provide concrete blocks to support reinforcement at required distance above grade. Use care not to damage vapor barriers where they occur.

D. Install and secure reinforcement to maintain required clearance between parallel bars and between bars and forms. Lapped splices shall be installed wherever possible in a manner to provide required clearance between sets of bars. Do not splice reinforcing bars at points of maximum stress except where indicated. Lap splices as shown or required to develop the full strength or stress of bars. Stagger lapped splices. Dowels and bars extending through construction joints shall be secured in position against displacement before concrete is installed and subsequently cleaned of concrete encrustations while they are still soft.

E. Clearances: Maintain minimum clear distances between reinforcing bars and face of concrete as indicated or directed.

F. Reinforcing Mesh: Lap one full mesh plus 2 inches, or 6 inches whichever is greater, at splices, wire tie, and support the same as specified for bars.

G. Use deformed bars unless otherwise indicated.

3.2 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

3.3 PROTECTION
A. Protect the Work of this section until Substantial Completion.

3.4 FIELD QUALITY CONTROL:

A. Inspection: Obtain inspection and approval of reinforcing before concrete is placed.

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -1
SECTION 03 30 00

CAST-IN-PLACE CONCRETE
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

B. Cast-in-place concrete placement and finishing.

1. Grout and Drypack, except as otherwise specified.

2. Placing of embedded anchor bolts and inserts.

3. Vapor barrier under interior floor slabs on grade.

4. Lumber Formwork.

C. Related Sections:

1. Section 014050: Testing and Inspection

2. Section 031000: Concrete Forming and Accessories.

3. Section 032000: Concrete Reinforcement

4. Section 061000: Rough Carpentry

5. Section 311313: Portland Cement Paving

1.2 SUBMITTALS
A. Shop Drawings: Submit Shop Drawings indicating locations of cast-in-place concrete and dimensioned locations of construction, control, and expansion joints. Show pour sequencing. Show details for constructing construction and expansion joints. Submit Shop Drawings showing work and accessory items such as vapor barriers. Include details and locations of reinforcing, embedded items, and interfacing with other Work.

B. Product Data:

1. Mix Design: Submit a concrete mix design for each mix that will be provided for the Work. Include water/ cement ratio, size of coarse aggregate and amount of any admixture. Predict minimum compressive strength, maximum slump and air content percentage. Mix designs shall be stamped and signed by a Civil or Structural Engineer registered in the State of California.

2. Manufacturer of ready-mixed concrete shall deliver to the City Inspector a certificate with each mixer truck. Certificate shall bear the signature of representative of the testing laboratory, and shall state quantity of cement, water, fine and coarse aggregate and admixtures.

C. Material Samples: Submit Samples illustrating concrete finish(s), color(s), minimum 12 inches by 12 inches in size.

D. Certificates: Submit a notarized certificate that each of following conforms to standards indicated:

1. Aggregates – ASTM Standards C33

2. Admixtures - ASTM Standards C260

3. Curing materials - ASTM Standards C171

1.3 QUALITY ASSURANCE
A. Comply with the following as a minimum requirement.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -2
B. American Concrete Institute (ACI) Publication:

1. ACI 211 - Recommended Practice for Selecting Proportions of Concrete.

2. ACI 304 - Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete.

3. ACI 305 - Recommended Practice for Hot Weather Concreting.

4. ACI 306 - Recommended Practice for Cold Weather Concreting.

5. ACI 308 - Recommended Practice for Curing Concrete.

6. ACI 309 - Recommended Practice for Consolidation of Concrete.

C. American Society for Testing and Materials (ASTM) Standards:

1. ASTM A 185 - Welded Steel Wire Fabric For Concrete Reinforcement.

2. ASTM C 31 - Making and Curing Concrete Test Specimens in the Field.

3. ASTM C 33 - Concrete Aggregates.

4. ASTM C 39 - Compressive Strength of Cylindrical Concrete Specimens.

5. ASTM C 88 - Soundness of Aggregates by use of Sulphate or Magnesium Sulphate.

6. ASTM C 94 - Ready-Mixed Concrete.

7. ASTM C 143 - Slump of Hydraulic Cement Concrete.

8. ASTM C 150 - Portland Cement.

9. ASTM C 171 - Sheet Materials for Curing Concrete.

10. ASTM C 172 - Sampling Freshly Mixed Concrete.

11. ASTM C 173 - Air Content of Freshly Mixed Concrete by the Volumetric Method.

12. ASTM C 227 - Potential Alkali Reactivity of Cement-Aggregate Combinations (Mortar-Bar Method).

13. ASTM C 231 - Air Content of Freshly Mixed Concrete by the Pressure Method.

14. ASTM C 260 - Air-Entraining Admixtures for Concrete.

15. ASTM C 289 - Potential Reactivity of Aggregates (Chemical Method).

16. ASTM D 1751 - Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types).

D. Continuous inspection shall be provided at the batch plant and for transit-mixed concrete to run check sieve analysis of aggregate, check moisture content of fine aggregate, check design of mix, check cement being used with test reports, check loading of mixer trucks, and certify to quantities of materials placed in each mixer truck.

E. Continuous batch plant inspection requirement may be waived in accordance with CBC section 1929.5. Waiver shall be in writing, including Agency approval.

F. Strength Test of Concrete: Refer to Section 014200: Testing and Inspection.

1.4 DELIVERY, STORAGE AND HANDLING
A. Mixing and Placing Concrete: Refer to Section 014200: Testing and Inspection.

B. Ready-mix concrete shall be mixed and delivered in accordance with ASTM C 94 and CBC Standard 19-3 and 19-4. Each batch of concrete delivered to the Project site shall be accompanied by a time slip bearing departure time and signature of batch plant supervisor. Concrete shall be placed within 90 minutes after start of mixing.

C. Store cement and aggregate materials so as to prevent their deterioration or intrusion by foreign

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -3
matter. Deteriorated or contaminated materials shall not be furnished.

1.5 JOB CONDITIONS
A. Cold Weather Requirements:

1. Adequate equipment shall be provided for heating concrete materials and protecting concrete during freezing or near-freezing weather. Surfaces, in which concrete is to come in contact with, shall be free from frost or ice. No frozen materials or materials containing ice shall be furnished.

2. When placing concrete during freezing or near-freezing weather the mix shall have a temperature of at least 50 degrees F., but not more than 90 degrees F. when cement is added. Concrete shall be maintained at a temperature of at least 50 degrees F. for at least 72 hours after placing or until it has thoroughly hydrated. When necessary, concrete materials shall be heated before mixing. Special precautions shall be provided for protection of transit-mixed concrete.

B. Hot Weather Requirements:

1. During hot weather, proper attention shall be provided for ingredients, production methods, handling, placing, protection and curing, to prevent excessive concrete temperatures or water evaporation which could impair required strength or durability.

PART 2 - PRODUCTS

2.1 GENERAL
A. Ready-Mixed Concrete: Mix and deliver in accordance with requirements of CBC Chapter 1905.

B. Strength of Concrete: Concrete, unless otherwise indicated or specified, shall be provided with a minimum ultimate 28-day strength of 3000 psi (f'c).

C. Shrinkage after 28 days of drying shall not exceed that specified in Concrete Section of the General Notes.Shrinkage Test:

2.2 MATERIALS
A. Cement: ASTM C 150. Furnished cement shall be as selected and reviewed for concrete proportioning.

B. Aggregates: Aggregates shall conform to ASTM C 33 and C 227 except as modified herein. Any suitable individual grading of coarse aggregate may be furnished, provided Grading of Combined Aggregate indicated in following table is obtained.

GRADING OF COMBINED AGGREGATE
Sieve Number or
Size in Inches
1-1/2"
Maximum
1"
Maximum
Passing a 2" ------ ------
Passing a 1-1/2" 95-100 ------
Passing a 1" 70-90 90-100
Passing a 3/4" 50-80 70-95
Passing a 3/8" 40-60 45-70
Passing a No. 4 35-55 35-55
Passing a No. 8 25-40 27-45
Passing a No. 16 16-34 20-38

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -4
Passing a No. 30 12-25 12-27
Passing a No. 50 2-12 5-15
Passing a No. 100 0-3 0-5
C. Water: Water shall be potable and free from deleterious matter.

D. Admixtures: CBC Chapter 19, Section 1903.6, Type A or D. Fly Ash is not allowed.

E. Fiber Joint Fillers: Preformed strips, non-extruding and resilient bituminous type, of thickness indicated, conforming to ASTM D 1751.

F. Curing Paper and Liquid Curing Compounds:

1. Curing Paper: A standard brand conforming to ASTM C 171, Type 1 - Regular, Kure-N-Seal.

2. Liquid Curing Compounds: A standard brand, clear liquid conforming to ASTM C 309, Master Builders, Grace, Antihydro.

G. Formwork: Clean, straight timbers without knots per 061000 Rough Carpentry, or otherwise specified within details.

H. Non-shrink grout:

1. Pre-package, non-metallic, non-gaseous when tested in accordance with ASTM C117, Grade C at fluid (flow cone) consistency of 20- to 30 seconds. Grout shall attain 7,500 psi compressive strength in 28- days at specified flow and shall not bleed. Master Builders “Masterflow 928”, Euclid Chemical Co. “Euco Hi-Flow Grout”, L&M Construction Chemicals “Crystex”.

I. Drypack: Field mixture of 1-part Portland cement to 2 parts fine aggregate mixed to a damp consistency such that a ball molded in the hands will stick together and hold its shape. At Contractor's option, the specified admixture may be added for increased workability at lower water/cement ratio. In lieu of field mixing, Contractor may use factory mixed drypack material, such as Master Builders "SetGrout" or Euclid "Euco Dry Pack Grout".

2.3 CONCRETE MIXING
A. Furnish ready-mixed concrete from an approved concrete batch plant. Conform to ASTM C94, except materials, testing, and mix designs as specified herein. Use transit mixer trucks equipped with automatic devices for recording number of revolutions of drum.

B. Admixtures: Admixtures shall be introduced into the concrete at the batch plant. Field additions are not acceptable.

C. Slump: Adjust quantity of water so concrete at point and time of placing does not exceed the following slumps when tested according to ASTM C143. Use the minimum water necessary for workability required by part of structure being cast.

SLUMP AND WATER/CEMENT RATIOS
Part of Structure Maximum Slump Inches* Maximum Water Cement Ratio Footings, foundation walls, and mass concrete 4 0.5
Slabs on grade, reinforced and non-reinforced 4 0.45
Reinforced concrete 8" or less thick 4 0.5
All other concrete 4 0.5
PART 3 - EXECUTION

3.1 GENERAL

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -5
A. Time of Placing: Do not place concrete until reinforcement, conduits, outlet boxes, anchors, hangers, sleeves, bolts, and other embedded materials are securely fastened in place. Contact the Inspector at least 24 hours before placing concrete; do not place concrete until inspected.

B. Pouring Record: A record shall be kept on the Project site of time and date of placing concrete in each portion of structure. Such record shall be maintained on the Project site until Substantial Completion and shall be available for examination by the Architect and Governing County.

3.2 PREPARATION
A. Moisture Barrier: Before installation of screeds and slab reinforcement, install a moisture barrier under slabs on grade. Place membrane in as large sheets as possible, lapped 12 inches at sides and ends, with top lap placed in the direction of the spreading of concrete. Extend membrane and lap at least 4 inches onto adjoining wall surfaces and seal with pressure-sensitive tape.

1. Install moisture barrier on minimum 2-inch bed of sand.

2. Patch punctures and tears in moisture barrier.

B. Screeds: Install screeds accurately and maintain at required grade or slab elevations after steel reinforcement has been installed, but before starting to place concrete. Install screeds adjacent to walls and in parallel rows not to exceed 8 feet on centers.

3.3 INSTALLATION
A. Conveying and Placing:

1. Concrete shall be placed only under direct observation of the Inspector. Do not place concrete outside of regular working hours.

2. Concrete shall be conveyed from mixer to location of final placement by methods, which will prevent separation or loss of materials.

3. Concrete shall be placed as nearly as practicable to its final position to avoid segregation due to rehandling or flowing. No concrete that has partially hydrated or has been contaminated by foreign materials shall be placed, nor shall re-tempered concrete or concrete which has been remixed after initial set be placed.

4. In placing concrete in columns, walls or thin sections, provide openings in forms, elephant trunks, tremies or other recognized devices, to prevent segregation and accumulation of partially hydrated concrete on forms or metal reinforcement above level of concrete being placed. Such devices shall be installed so that concrete will be dropped vertically. Unconfined vertical drop of concrete from end of such devices to final placement surface shall not exceed 6 feet.

5. Concrete shall be placed as a continuous operation until placing of panel or section is completed.

Top surfaces of vertically formed lifts shall be level.

6. Concrete shall be thoroughly consolidated during placement and shall be worked around reinforcement and embedded fixtures with mechanical vibrators.

7. Where conditions make consolidation difficult, or where reinforcement is congested, batches of mortar containing same proportions of cement, sand, and water as provided in the concrete, shall first be deposited in the forms to a depth of at least one inch.

B. Compaction and Screeding:

1. Tamp freshly placed concrete with a heavy tamper until at least 3/8 inch of mortar is brought to surface.

Concrete shall then be tamped with a light tamper and screeded with a heavy straightedge until depressions and irregularities are eliminated, and surface is true to finish grades or elevations. Remove excess water and debris.

2. Where slabs are to receive separate cement finish or mortar setting bed, continued tamping to raise mortar to surface is not performed. Laitance shall be removed by brushing with a stiff brush or by light

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -6
sandblasting to expose clean top surface of coarse aggregate C. Floating and Troweling:

1. When concrete has hydrated sufficiently, it shall be floated to a compact and smooth surface. After floating, wait until concrete has reached proper consistency before troweling. Top surfaces shall receive at least 2 troweling operations with steel hand trowel. Prior to and during final troweling, apply a fine mist of water frequently with an atomizing type fog sprayer.

2. For interior finish slabs, final troweling shall provide a hard, impervious, and non-slip surfaces, free from defects and blemishes. Finished surface shall be within a tolerance of 1/8 inch in 10 feet. Avoid burnishing. Do not add cement or sand to absorb excess moisture.

3. Vertical concrete surfaces shall be finished smooth and free from marks or other surface defects.

D. Curing:

1. Concrete shall be maintained above 50 degrees F., and in a moist condition for 7 days after placing, except that high early strength concrete shall be maintained in a moist condition for 3 days.

2. If weather is hot or surface has dried out, spray surface of concrete slabs and paving with fine mist of water, starting not later than 2 hours after final troweling and continuing until sunset. Surface of finish shall be kept continuously wet until curing medium has been installed.

3. Immediately after finishing, monolithic floor slabs shall be covered with curing paper. Paper shall be lapped 3 inches at joints and sealed with waterproof sealer. Edges shall be cemented to finish. Repair or replace paper damaged during construction operations.

4. Within 24 hours after finishing, exterior slabs and paving, and interior slabs to receive cement topping or mortar setting beds, shall be covered with sand to a depth of 2 inches and kept thoroughly wet for 7 days.
a. Instead of sand covering, exterior walks and paving where no other surface treatment is specified may be cured with clear liquid curing compound immediately installed in accordance with manufacturer's directions.

E. Filling, Leveling and Patching:

1. Holes resulting from form ties or sleeve nuts shall be solidly packed, through exterior walls, by pressure grouting with cement grout, as specified. Grouted holes on exposed surfaces shall be screeded flush and finished to match adjoining surfaces.

F. Cement Base: Cement base shall be of the height, thickness, and shape detailed. Base shall be reinforced with one inch mesh, 18 gage, zinc-coated wire fabric. Base finish mixture shall be one-part Portland cement, 2 parts of fine
aggregate and one-part pea gravel. Colored cement base shall include a chemically inert mineral oxide pigment in the mix.

3.4 FINISHING
A. Broom _ Horizonal surfaces shall be broom finished to match existing adjacent surfaces. Provide 4͛x4͛mock up for approval prior to start of work.

3.5 EXPANSION AND CONSTRUCTION JOINTS
A. Construction Joints: Details and proposed location of construction joints shall be as indicated on the Drawings, located to least impair strength of structure, in accordance with the following:

1. Thoroughly clean contact surface by sand blasting entire surface not earlier than 5 days after initial placement.

2. A mix containing same proportion of sand and cement provided in concrete plus a maximum of 50 percent of coarse aggregate shall be placed to a depth of at least one inch on horizontal joints. Vertical

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -7
joints shall be wetted and coated with a neat cement grout immediately before placing of new concrete.

3. Shall contact surface become coated with earth, sawdust, or deleterious material of any kind after being cleaned, entire surface shall be re-cleaned before applying mix.

B. Expansion Joints: Provide expansion joints in walks and exterior slabs. Space approximately 20 feet apart, unless otherwise indicated. Joints shall extend entirely through slab with joint filler in one piece for width of walk or slab.

C. Tooled Joints: Slabs, walks and paving shall be marked into areas as indicated with markings made by saw cutting. Marks shall be round-edged, free from burrs or obstructions, with clean cut angles and shall be straight and true. Walks, if not indicated, shall be marked off into rectangles of not more than 5 square feet and shall have a center marking where more than 5 feet wide.

3.6 TESTING
A. Molded Cylinder Tests:

1. Owner Consultant will prepare cylinders. Each cylinder shall be dated, given a number, point in structure from which sample was obtained, mix design number, mix design strength and result of accompanying slump test noted.

2. Separate tests of molded concrete cylinders obtained at same place and time shall be made at age of 3 days, 7 days, and 28 days. A strength test shall be the average of the compressive strength of 2 cylinders, obtained from the same sample of concrete and tested at 28 days or at test age designated for determination of f'c.

3. Test cylinders shall be prepared at the Project site and stored in testing laboratory in accordance with ASTM C 31 and tested in accordance with ASTM C 39.

B. Core Test: At request of the Architect, cores of hardened concrete shall be cut from portions of hydrated structures for testing, in accordance with CBC and ASTM C 42.

1. Provide 4 inch diameter cores at representative places throughout the structure as designated by the Architect.

2. In general, provide sufficient cores to represent concrete placed with at least one core for each 4,000 square feet of building area, and at least 3 cores total for each Project.

3. Where cores have been removed, fill voids with drypack, and patch the finish to match the adjacent existing surfaces.

C. Concrete Consistency: Measure consistency according to ASTM C 143. Test twice each day or partial day's run of the mixer.

D. Adjustment of Mix: If the strength of any grade of concrete for any portion of Work, as indicated by molded test cylinders, falls below minimum 28 days compressive strength specified or indicated, adjust mix design for remaining portion of construction so that resulting concrete meets minimum strength requirements.

E. Defective Concrete

1. Shall strength of any grade of concrete, for any portion of Work indicated by tests of molded cylinders and core tests, fall below minimum 28 days strength specified or indicated, concrete will be deemed defective Work and shall be replaced.

2. Concrete Work that is not formed as indicated, is not true within 1/250 of span, not true to intended alignment, not plumb or level where so intended, not true to intended grades and levels, contains sawdust shavings, wood or embedded debris, or does not fully conform to Contract provisions, shall be deemed to be defective Work and shall be removed and replaced.

3.7 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
CAST IN PLACE CONCRETE 03 30 00 -8

3.8 PROTECTION
A. Protect the Work of this section until Substantial Completion.

END OF SECTION
SECTION 12 93 00

SITE FURNISHINGS

I GENERAL
a) Scope of Work:

1. Furnish and install Basketball Post /Hoop / Backboard

II PRODUCTS
a) Basketball Post / Hoop / Backboard
Mfr: Jaypro
Model No.: #SPA4-AC-UG / 4 ½” Pole. Acrylic Board / Ultimate Goal / Powder Coat Option for Basketball Gooseneck / Jaypro #JNY-6HP / Anti-Whip Net
Supplier: Dave Bang Associates / 1.800.669.2585

III INSTALLATION
a) General:

Installation shall be in the locations shown on the drawings after approval of precise location by City. Install according to manufacturer's written instructions or according to approved shop drawings. Install all metal supports and post in footings prior to installing any concrete slabs.

Final locations of all equipment to be coordinated with all existing and new improvements, marked and approved in the field for approval by City representative.

Any site furnishings not imbedded shall be surface mounted to a 4” concrete slab min. 2’ sq. or by width and length of item using minimum 3/8" x 3" long lag screws in expansion shields.

Concrete footings: All site furnishings which are embedded in the ground shall have a 12” x 18” minimum concrete footing. If the manuf. has a specified method of installation, it shall take precedence over the above footing.

END OF SECTION 12 93 00

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
SITE FURNISHINGS 12 93 00-1

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 1
PART 1 - GENERAL

1.01 SCOPE
SECTION 26 00 10

BASIC ELECTRICAL REQUIREMENTS
A. This section supplements all sections of this division and shall apply to all phases of work hereinafter specified, shown on the drawings, or required to provide a complete installation of electrical systems for the Project. The work required under this division is not limited to the electrical specifications and drawings. Refer to all bid documents including Civil, Architectural, Structural, and Mechanical documents which may designate Work to be accomplished. The intent of the Specifications is to provide a complete and operable electrical system, which shall include all documents that are a part of the entire Project Contract.

1. Work included: Furnish all labor, material, tools, equipment, facilities, transportation, skilled supervision necessary for, and incidental to, performing operations in connection with furnishing, delivery, and installation of the work in this division complete as shown or noted on the Drawings and specified herein.

B. Related Work Specified Elsewhere:

1. Refer to all sections in the general contract conditions, Contract Requirements and Division 1, General Requirements.

C. Work Installed but Furnished by Others:

1. The electrical work includes the installation or connection of certain materials and equipment furnished by others. Verify installation details. Foundations for apparatus and equipment will be furnished by others unless otherwise noted or detailed.

1.02 GENERAL REQUIREMENTS
A. Guarantee See General Conditions:

1. Except as may be specified under other Sections in the drawing specification, guarantee equipment furnished under the specifications for a period of one year, except for equipment required to have a longer guarantee period, from date of final completion. Guarantee all work against defective workmanship, material, and improper installation. Upon notification of failure, correct deficiency immediately and without additional cost to the Owner.

2. Standard warranty of manufacturer shall apply for replacement of parts after expiration of the above period. Manufacturer shall furnish replacement parts to the Owner or his service agency as approved. Furnish to the Owner, through the Architect, printed manufacturer's warranties complete with material included and expiration dates, upon completion of project. Conform to Division 01.

B. Equipment Safety: All electrical materials and equipment shall be new and shall be listed by Underwriter's Laboratories and bear their label, or listed and certified by a nationally recognized testing authority where UL does not have an approval. Custom made equipment must have complete test data submitted by the manufacturer attesting to its safety.

C. Codes and Regulations:

1. Design, manufacturer, testing and method of installation of all apparatus and materials furnished under the requirements of these specifications shall conform to the latest publications or standard rules of the following:
a. Institute of Electrical and Electronic Engineers - IEEE b. National Electrical Manufacturers' Association - NEMA c. Underwriters' Laboratories, Inc. - UL
d. National Fire Protection Association - NFPA
e. American Society for Testing and Materials - ASTM
f. American National Standards Institute - ANSI
g. California Electrical Code - CEC, Title 24, Part 3
h. California Code of Regulations, Title 8, Subchapter 5 i. California Building Code-CBC, Title 24 Parts 1 &2

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 2
j. State & Municipal Codes in Force in the Specific Project Area

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 3
9/7/2021
k. Occupational Safety & Health Administration - OSHA
l. California State Fire Marshal
m. California Fire Code- CFC, Title 24 Part 9
n. National Electrical Testing Association - NETA

2. The term "Code", when used within the specifications, shall refer to the Publications, Standards, ordinances and codes, listed above. In the case where the codes have different levels of requirements the most stringent rules shall apply.

D. Requirements of Regulatory Agencies:

1. Codes, Permits, and Fees: Where the Contract Documents exceed minimum requirements, the Contract Documents take precedence. Where code conflicts occur, the most stringent shall apply.

The most stringent condition shall be as interpreted by the Engineer. a. Comply with all requirements for permits, licenses, fees and Code. Permits, licenses, fees, inspections and arrangements required for the Contractor at his expense shall obtain the Work, unless otherwise specified.
b. Comply with the requirements of the applicable utility companies serving the Project. Make all arrangements with the utility companies for proper coordination of the Work.

E. Shop Drawings:

1. See Division 01 for additional requirements.

2. Time Schedules for Submission and Ordering: The Contractor shall prepare, review and coordinate his schedule of submissions carefully, determining the necessary lead time for preparing, submitting, checking, ordering and delivery of materials and equipment for timely arrival. The Contractor shall be responsible for conformance with the overall construction schedule.

3. Submittals will be checked for general compliance with specifications only. The Contractor shall be responsible for deviations from the drawings or specifications and for errors or omissions of any sort in submittals.

4. Submit a complete list of materials and equipment proposed for the job, including manufacturers names and catalog numbers.

5. Shop drawings shall be submitted in completed groups of materials (i.e., lighting fixtures or switchgear). The Contractor shall add and sign the following paragraph on equipment and materials submitted for review. "It is hereby certified that the (equipment) (material) shown and marked in this submittal is that proposed to be incorporated into the project; is in compliance with the Contract Drawings and specifications and can be installed in the allocated spaces". Failure to add the above written statement for compliance will result in return of submittals without review. a. Bind catalog cuts, plate numbers, descriptive bulletins, and drawings, 11" x 17" (275 mm x 435 mm) or smaller, in sets with covers neatly showing titles. b. The Contractor shall verify dimensions of equipment and be satisfied as to Code compliance for fit prior to submitting shop drawings for approval. c. Where current limiting devices are specified, submit technical data to substantiate adequate protection of equipment cascaded downstream. Submittals shall not be reviewed unless supporting calculations and data are submitted therewith. d. Include complete catalog information such as construction, ratings, insulation systems, as applicable.
e. For any material specified to meet UL or trade standards, furnish the manufacturers or vendor's certification that the material furnished for the work does in fact equal or exceed such specifications.
f. Reference listings to the specifications' Sections and Article to which each is applicable. g. Equipment Floor Plans: After approval of material is secured prepare a floor plan of each electrical and communication equipment space, room or yard, drawn to scale at 1/2 inch equals 1 foot and submit for approval in the same manner as for shop drawings. The layout drawings shall be exact scale.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 4
9/7/2021

6. Contractor shall prepare coordinated drawings when required by Division 01 or where noted otherwise.

F. Interpretations: The Contractor through the Architect must make Requests for interpretations of drawings and specifications. Any such requests made by equipment manufacturers or suppliers will be referred to the Contractor.

G. Standard of Quality

1. The contract Drawings and Specifications establish the “MINIMUM STANDARD OF QUALITY” each product and/or system must meet to be considered acceptable. Products of other manufactures will be considered if the product and/or system meet or exceed the “MINIMUM STANDARD OF QUALITY” established by this Contract Document.

2. Items for similar application shall be of the same manufacturer.

3. The label of listing by UL shall appear on all materials and equipment for which standards have been established by the agency.

4. Where codes as listed in Section General Requirement Section of the Specifications that establish label or approved requirements, furnish all materials and equipment with either the required labels affixed or the necessary written approval.

5. Provide the type and quantity of electrical materials and equipment necessary to complete Work and all systems in operation, tested and ready for use.

6. Provide and install all incidental items that belong to the Work described and which are required for complete systems.

7. All switchboards, distribution boards, panel boards and circuit breakers shall be of the same manufacturer.

8. All wiring devices such as switches and receptacles shall be of the same manufacturer.

H. Substitutions: Refer to Division 01
I. Submit comprehensive material list, shop drawings and complete technical data for the following equipment and materials:

1. General Requirements:
a. Main service and distribution switchboards.
b. Panelboards.
c. Conduits
d. Conductors, include all selected insulation types.
e. Fuses
f. Disconnect switches and Starters.
g. Pullboxes, manholes and handholes.
h. Standard lighting fixtures, specially fabricated fixtures, ballasts and lamps, with samples and sample of standard finish available (where requested).
i. Control devices, standard and special receptacles, switches, outlets and finish device plates.

J. Utility Service:

1. Contractor shall verify the locations shown on the drawings and shall include extensions of lines to building service from locations which are acceptable to the Owner.

2. Verify electrical, civil, architectural and structural, dimensional and other requirements with the Owner.

3. Should any major modifications to the work indicated be necessary to comply with the Owner requirements, notify the Architect.

4. Contractor shall contact the utility company representatives to establish pre-construction coordination, obtain all necessary meters and/or approvals, and schedule utility work to coordinate with the construction schedule.

5. All utility services shall be installed per the utility company requirements. Verify final construction requirements with utility company service planners prior to construction.

K. Record Drawings: Refer to Division 01, Contract Closeout.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 5
9/7/2021
L. Work Responsibilities:

1. The drawings indicate diagrammatically the desired locations or arrangement of conduit runs, outlets, junction boxes and equipment and are to be followed. Execute the work so as to secure the best possible installation in the available space and to overcome local difficulties due to space limitations. The Contractor is responsible for the correct placing of his work. Where conflicts occur in plans and/or specifications, the most stringent application shall apply and shall be part of the base bid.

2. Locations shown on architectural plan or on wall elevations shall take precedence over electrical plan locations, but where a major conflict is evident, notify the Architect.

3. In the event minor changes in the indicated locations or arrangement are necessary due to developed conditions in the building construction or rearrangement of furnishings or equipment or due to interference with other trades, such changes shall be made without extra cost.

4. Verify dimensions and the correct location of Owner-Furnished equipment before proceeding with the roughing-in of connections.

5. All scaled and figured dimensions are approximate of typical equipment of the class indicated. Before proceeding with work carefully check and verify dimensions and sizes with the drawings to see that the furnished equipment will fit into the spaces provided without violation of applicable Codes.

6. Should any changes to the work indicated on the drawings or described in the specifications be necessary in order to comply with the above requirements, notify the Architect.

7. Contractor shall be responsible for coordination of coordinated drawings when required by the Architect.

8. Replace or repair, without additional compensation any work which does not comply with or which is installed in violation of any of these requirements.

M. Installation General: For special requirements, refer to specific equipment under these requirements.

1. Unless otherwise specified elsewhere in the specifications, do all excavating necessary for the proper installation of the electrical work.

2. Locations of Openings: Locate chases, shafts and openings required for the installation of the electrical work during framing of the structure. Do any additional cutting and patching required.

Cutting or drilling in any structural member is prohibited without approval of the Architect. Furnish all access panels to make all boxes, connections and devices accessible as required by CEC.

3. Location of Sleeves: Where conduits pass through concrete walls, suspended slabs or metal deck floors, install sleeves of adequate size to permit installation of conduit. Sleeves shall be installed prior to pouring of concrete and shall have ends flush with the wall or extend 2 inches above floor surfaces. Verify locations.

4. Wherever conduit extends through roof, install flashings in accordance with drawings and details.

5. Contractor shall be responsible for cutting and patching which may be required for the proper installation of the electrical work.

6. Protect work, materials and equipment and provide adequate and proper storage facilities during the progress of the work. Storage outdoors shall be weather protected and shall include space heaters to prevent condensation. Provide for the safety and good condition of all work until final acceptance of the work. Replace all damaged or defective work, materials and equipment before requesting final acceptance.

7. Conduit and Equipment to be Installed: Clean thoroughly to remove plaster, spattered paint, cement and dirt on both exterior and interior. All underground conduits shall be mandrelled prior to pulling wire.

8. Conduit and Equipment to be Painted: Clean conduit exposed to view in completed structure by removing plaster and dirt. Remove grease, oil and similar material from conduit and equipment by wiping with clean rags and suitable solvents in preparation for paint.

9. Items with Factory Finish: Remove cement, plaster, grease and oil, and leave surfaces, including cracks and corners, clean and polished. Touch up scratched or bare spots to match finish.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 6
9/7/2021

10. Site Cleaning: Remove from site all packing cartons, scrap materials and other rubbish on a weekly basis. Vacuum out all cabinets, switchgear and panels and junction boxes prior to pulling any conductors.

11. Electrical equipment and materials exposed to public and in finished areas shall be finish-painted after installation in accordance with the Painting Section. All exposed screw-type fasteners, exterior, or interior in restrooms, shall be vandal-resistant spanner type; include tool.

N. Excavation, Cutting and Patching:

1. Excavating, trenching and backfilling required for the work of this Division in accordance with the applicable requirements of Division 2. Excavating and backfilling connected with electrical work, repaving cuts and providing and maintaining protective measures for the electrical work excavation required by the governing authorities having jurisdiction shall be performed as a part of the work of this Division.

2. Verify openings indicated on the drawings. Provide all cutting, patching and reinforcement of the construction of the building as required to install electrical work.

O. Tests

1. Equipment and systems for which the National Electrical Testing Association (NETA) has an approved or recommended procedure, shall be tested in accordance with that procedure. Test values shall equal values recommended by NETA. Copies of test reports shall be submitted as required under shop drawing submittals.

2. Resistance to ground tests shall be accomplished by a qualified independent testing firm to measure resistance to ground at grounding electrodes. Make tests before slabs or affected areas are poured in order that corrective measures, if required, may be taken. Submit a report showing the results of these measurements. If the resistances exceed values specified elsewhere or NETA test procedure recommendations, perform corrective measures required to reduce resistance to acceptable values.

3. Prior to energizing any motor, measure the service voltage for phase balance and report if unbalance exceeds 1% from mean.

4. Measure the three-phase voltage at no load and at maximum load conditions and submit to the engineer a report showing the results of these measurements.

5. Upon completion of the work and adjustment of all equipment, conduct an operating test. Conduct the test in the presence of an authorized representative of the Owner's Representative. Demonstrate system and equipment to operate in accordance with requirements of the Contract Documents and to be free from electrical and mechanical defects. Provide systems free from short circuits and grounds and show an insulation resistance between phase conductors and ground not less than the requirements of the governing electric code. Test circuits for proper neutral connection.

6. Complete tests prior to final inspection of project, including corrective work based on the results of the tests.

7. Perform special tests on systems and equipment as specified herein using personnel qualified to perform such tests.

P. Protection: Protect finish parts of the materials and equipment against damage during the progress of the work and until final completion and acceptance. Cover materials and equipment in storage and during construction in such a manner that no finished surfaces will be damaged or marred. Keep moving parts clean, dry and lubricated.

Q. Cleaning Up:

1. Upon completion of the work and at various time during the progress of the work, remove from the building all surplus materials, rubbish and debris resulting from the work of this Division.

2. Thoroughly clean switchgear including busses, apparatus, exposed conduit, metal work including the exterior and interior, and accessories for the work of this Division, of cement, plaster and other deleterious materials; remove grease and oil spots with cleaning solvent; carefully wipe surfaces and scrape cracks and corners clean.

3. Thoroughly polish chromium or plated work. Remove dirt and stains from lighting fixtures.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 7
9/7/2021

4. Leave the entire installation in a clean condition.

R. Completion:

1. The work will not be reviewed for final acceptance until operating and maintenance data, manufacturer's literature, panel directories and nameplates specified herein have been approved and properly posted or installed and final cleaning of equipment and premises has been completed.

2. When the installation is complete and adjustments have been made, operate the system for a period of one week, during which time demonstrate that systems are completed and operating in conformance with the specifications.

S. Operating and Maintenance Data: Submit complete and at one time, prior to acceptance of the installation, 4 copies of manufacturer's instructions for operation and maintenance of electrical equipment, including replacement parts lists. As specified in Division 01
T. Inspection and Acceptance Procedures: The Architect will submit observation reports periodically during the construction phase detailing Contract deficiencies. The Contractor is responsible for making corrections immediately. Notice of Completion of the project will not be made until all items have been corrected.

U. Final Completion of Electrical Systems:

1. Prior to Final Completion of operating electrical systems, the Contractor shall:
a. Provide materials of the type and quality specified and as necessary for proper operation, tested and ready for use.
b. Furnish the required Operating and Maintenance Data/Manuals. c. Clean up of the project pertaining to this Division of the work. d. After installation has been completed and adjustments made, operate the system for a period of one week, during which time, demonstrate to the Architect that systems are complete and operating in conformance with Contract Documents. e. Conduct tests required and as specified in this Division and submit test reports and corrective actions taken.
f. Submission of warranties and guarantees.

2. Final Completion of Work Shall be Contingent On:
a. Contractor replacing defective materials and workmanship. b. Upon completion of work and adjustments made, Contractor shall conduct an operating test for each system for approval at such time as Architect directs. Conduct test in presence of authorized representative of Architect and demonstrate that systems and equipment do operate in accordance with requirements of the Contract Documents and are free from electrical and mechanical defects.
c. Contractor shall provide the necessary training programs and instructions to the Owner's representative. Number of hours shall be a minimum of four (4) hours for each system or days as required under separate Sections of these Specifications. Complete operation and maintenance manuals shall be provided at least two (2) weeks prior to training. d. Submit copies of manufacturer's instructions and maintenance of electrical equipment including replacement parts lists. Each set shall include one set of shop drawings of equipment installed.

V. Submittals for Change Orders: When changes are made during the construction phase, deletions and additions shall be presented in a manner that will indicate the cost of each item of material and corresponding labor.

Markup shall be then added in accordance with the requirements of the General Conditions as modified by the Supplementary Conditions.

W. The Contractor at a time convenient to the Owner shall provide instruction to the Owner's operating personnel in the proper operation and maintenance of all equipment and systems. The instructors shall have received factory training and shall be thoroughly familiar with the equipment installed. The operating personnel shall receive the number of days instruction as indicated in other sections.

1.03 PROJECT RECORD DOCUMENTS

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 8
9/7/2021
A. Record Drawings: CAD: Use a computer aided drafting (CAD) system in the preparation of record drawings for this Project. Acceptable CAD systems shall be capable of producing files in AutoCAD Version 2012 compatible DWG or DXF format. Owner's consultant will furnish CAD backgrounds for use by the Contractor after construction is 85% complete except where prohibited by Contract.

B. Record Set During the Work: At site, maintain at least one set of Drawings as a Field Record Set. Also maintain at least one copy of all Addenda, Modifications, approved submittals, correspondence, and transmittals at site. Keep Drawings and data in good order and readily available to Architect and Owner.

C. Changes: Clearly and correctly mark Record Drawings to show changes made during the construction process at the time the changed work is installed. No such changes shall be made in the work unless authorized by the Architect.

D. Final Record Drawings: Conform to Division 01 requirements.

E. Preparation of Final Record Drawings: Contractor shall transfer recorded changes in the work indicated on the Field Record Set to the record set. Changes shall be neatly and clearly drawn and noted by skilled draftsmen, and shown technically correct.

F. Approval: Prior to Architect's inspection for Substantial Completion, submit the Final Record Drawings to the Architect for review, and make such revisions as may be necessary for Final Record Drawings to be a true, complete, and accurate record of the work.

G. Manuals: Obtain data from the various manufacturers and submit instruction, operation, and maintenance manuals as required and to the extent required under other Sections.

H. At all times when the work is in progress, maintain at the workplace, fabrication shop or Project Site as applies, a complete separate, clean, undamaged set of the latest stamped, actioned submittals. As work progresses, maintain records of "as installed" conditions on this set in suitable ink or chemical fluid. Update the set daily. After successful completion of Project Site testing specified herein, and after completion of Punch List corrections, copy all records of "as installed" conditions on to originals.

I. Quantity:

1. Review sets: As for Shop and Field Drawings.

2. Record set: Refer to Division 01.

J. Content: All drawings required under "Field and Shop Drawings". Show "as installed" condition. Where room designations according to Project permanent signage differ from construction designations in the Contract Documents, show both designations.

K. Warranty Certificates: Comply with Division 01.

PART 2 - COMMISSIONING

2.01 COMMISSIONING OF ELECTRICAL SYSTEMS
A. Include cost for commissioning requirements in the contract price.

B. Attend commissioning meetings scheduled by the CxA.

C. Prepare preliminary schedule for indoor lighting system inspections, O&M manual submission, training sessions, lighting controls testing, system verification, performance testing, and system completion for use by the CxA.

Update schedule as appropriate throughout the construction period and provide updated schedule to the commissioning team.

D. Verify proper installation and performance of all electrical services provided.

E. Complete Title 24 Certificate(s) of Installation and manufacturer’s pre-start checklists prior to scheduling startup of HVAC and electrical equipment.

1. Retain Certificate(s) of Installation in a 3-ring binder in an organized fashion. Binder is to remain on the job site

2. Make Certificate(s) of Installation available for CxA review upon request.

3. Retain calibration records for equipment provided with manufacturer calibrated sensors in the Certificate(s) of Installation binder.

F. Where applicable, complete the Certificate(s) of Acceptance per the contract documents.

1. Retain Certificate(s) of Acceptance in a 3-ring binder in an organized fashion. Binder is to remain on the job site

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
BASIC ELECTRICAL REQUIREMENTS 26 00 10 - 9
9/7/2021

2. Provide copies of all Certificate(s) of Acceptance to the CxA.

3. Certificate(s) of Acceptance shall be conducted by companies who are certified as California Advanced Lighting Controls Training Program Acceptance Technician (CALCTP-AT) employer and only completed by those employees of said company who are certified to complete the respective acceptance test.

G. Monitor and respond to Resolution Tracking Forms distributed by the CxA in order to expedite corrective actions necessary to achieve design intent.

H. Participate in the Certificate(s) of Acceptance and Functional Performance Tests as required to achieve design intent.

I. Participate in the opposite-season testing as required to achieve design intent.

J. Participate in O&M Training as required by project specifications.

K. Ensure participation of major equipment manufacturers and their representatives as applicable.

L. Obtain O&M data on all equipment and assemble in binders using tabs as required.

M. Conduct a maintenance orientation and inspection with hands on training per the contract documents.

N. Provide written certification and completed Certificate(s) of Installation forms and checklists documenting that the following work has been completed in accordance with the plans and specifications and that they are functioning as designed.

1. Correct labeling of all circuits with connected equipment.

2. Lighting system controls operations, including occupancy sensors, automatic time controls or Energy Management control, override timers, manual dimming controls, exterior lighting controls, multi-level switching, as applicable to the Work.

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
FINISH GRADING 31 22 19 - 1
SECTION 31 22 19

FINISH GRADING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This section includes the following:

1. Weeding.

2. Finish grading of lawn and planting areas.

1.3 DEFINITIONS
A. Finish grading: finish grading shall consist of adjusting and finishing soil surfaces with site or imported topsoil, raking grades to a smooth, even, uniform plane. Remove and legally dispose of all extraneous matter off site.

Facilitate natural run-off water and establish grades and drainage indicated as part of the contract work.

PART 2 PRODUCTS

2.1 MATERIALS
A. Topsoil: Refer to Division 02; Landscape Planting.

B. Obtain imported topsoil from approved local sources.

PART 3 EXECUTION

3.1 EXAMINATION
A. Verification of conditions: Prior to commencing the finish grading, review the installed work of other trades and verify that their work is complete.

1. Rough Grading: Grading for ADA accessible trail, amphitheater, Frog Pond exhibit, wood decking area, and parking lot renovation shall be established to within plus or minus 0.10 foot prior to beginning of finish grading.

B. Import topsoil only when necessary to supplement site soil to achieve grades shown on drawings, or if site soil is unsuitable for planting.

3.2 PREPARATION
A. Weeding: Before finish grading, weeds and grasses shall be dug out by the root or sprayed with an herbicide and disposed of off-site. This procedure is outlined under the Landscape Planting Section.

B. Debris: To a depth of 6 inches: remove stones and debris 1 inch in diameter and greater and clumps of earth that do not break up. Dispose of off-site, or incorporate in fill areas per section 31 20 00 Earthwork.

3.3 INSTALLATION
A. General: When rough grading and weeding have been completed, and the soil has dried sufficiently to be readily worked, lawn and planting areas shall be graded to the elevations indicated on the Drawings.

1. Grades indicated on Drawing are grades that will result after thorough settlement and compaction of the soil.

2. Grades not otherwise indicated shall be uniform finish grades and, if required, shall be made at the direction of the Architect.

3. Finish grades shall be smooth, even, and a uniform plane with no abrupt change of surfaces.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
FINISH GRADING 31 22 19 - 2

4. Soil areas adjacent to buildings shall slope away from the building to allow a natural run-off of water, and surface drainage shall be directed as indicated on the drawings by remodeling surfaces to facilitate the run off water at 2% minimum grade.

5. Low spots and pockets shall be graded to drain properly.

B. Drainage: Finish grade with proper slope to drains or existing swales.

1. Flow lines, designated or not, shall be graded and maintained to allow free flow of surface water.

2. If any drainage problems arise during construction period due to Contractor's work (such as, but not limited to, low spots, slides, gullies and general erosion), the Contractor shall be responsible for repairing these areas to a condition equal to their original condition, and in so doing shall prevent further drainage problems from occurring.

C. Toe of slope: To prevent soil creep or erosion across pavement, where pavement (walk, curb, etc.) is at the toe of a slope, finish grade is to level out or swale slightly at least 6” before reaching pavement.

D. Moisture Content: The soil shall not be worked when the moisture content is so great that excessive compaction occurs, nor when it is so dry that dust may form in the air or that clods do not break readily. Water may be applied, if necessary, to provide moisture content for tilling and planting operations. It is the Contractor’s responsibility to control dust that is spread as a result of grading operations.

E. Grades: The finish grade in areas to be planted with turf shall be 2- inches below grade of adjacent pavement and walks.

F. Compaction: Soils in planted areas shall be loose and friable, yet firm enough that no settling occurs from normal foot traffic or irrigation.

3.4 FIELD QUANTITY CONTROL
A. It is the Contractor's responsibility to contact the Architect 48 hours or two working days in advance of each agreed observation or conference.

B. Schedule for On-Site Inspections: at completion of finish grading and prior to any planting operations.

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
PERVIOUS CONCRETE 34 12 43 -1
SECTION 32 12 43

PERVIOUS CONCRETE
PART 1 GENERAL

1.01 Scope of Work:

A. The Work to be completed under this contract includes the furnishing of all labor, materials and equipment necessary for construction of Portland Cement Pervious Concrete Pavement for picnic table slab areas in conformance with the plans and specifications.

1.02 References:

A. American Concrete Institute

1. ACI 305 “Hot Weather Concreting”

2. ACI 522 “Report on Pervious Concrete”

3. ACI Flatwork Finisher Certification Program

4. ACI Field Technician Certification Program

5. American Society for Testing and Materials

6. ASTM C29 “Test for Bulk Density (Unit Weight) and Voids in Aggregate”

7. ASTM C33 “Specification for Concrete Aggregates”

8. ASTM C42 “Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.”

9. ASTM C94 Specification for Ready-Mixed Concrete

10. ASTM C117 “Test Method for Material Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing.”

11. ASTM C138 “Test Method for Density (Unit Weight), Yield and Air Content (Gravimetric) of Concrete.”

12. ASTM C140 “Test Methods for Sampling and Testing Concrete Masonry Units and Related Units”

13. ASTM C150 “Specification for Portland Cement”

14. ASTM C172 “Practice for Sampling Freshly Mixed Concrete”

15. ASTM C260 “Specification for Air-Entraining Admixtures for Concrete”

16. ASTM C494 “Specification for Chemical Admixtures for Concrete”

17. ASTM C595 “Specification for Blended Hydraulic Cements” B. ASTM C618 “Specification for Coal Fly Ash and Raw or Calcined Natural

1. Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete.”

2. ASTM C989 “Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars.”

3. ASTM C1077 “Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation.”

4. ASTM C 1602 “Specification for Mixing Water Used in the Production of Hydraulic Cement Concrete”

5. ASTM D1557 “Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3).”

6. D3385 “Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer”

7. ASTM E329 “Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction.”

1.03 Quality Assurance:

A. Prior to award the contractor shall submit evidence of four successful Pervious Concrete Pavement projects or accumulated over 75,000 sq ft of installation including but not limited to the following:

B. Project name and address, owner name and contact information C. Test results including density (unit weight), void content and thickness D. At least three members or 30% of the crew should be certified by the National Ready-Mixed Concrete Association as a “Certified Pervious Concrete Technician.” E. At least one member of the crew should be certified by the National Ready-Mixed Concrete Association as a “Certified Pervious Concrete Installer.”
F. At least one member of the crew should be a Certified Concrete Finisher in accordance with the criteria of the American Concrete Institute.

1.04 Special Equipment: Pervious concrete requires specific equipment for compaction and jointing. The pavement shall be jointed and compacted using the methods listed.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
PERVIOUS CONCRETE 34 12 43 -2
A. Rolling compaction shall be achieved using a minimum 10-inch diameter steel pipe that spans the width of the section placed (and exerts a vertical pressure of at least 10 psi on the concrete).

B. Plate compaction shall be achieved using a standard soil plate compactor that has a base area of at least two square feet and exerts a minimum of 10 psi vertical pressure on the pavement surface.

C. When joints are placed in pervious pavements, they may be constructed by rolling, forming or sawing.

Rolled joints shall be formed using a “salt roller” to which a beveled fin with a minimum depth of ¼ the thickness of the slab has been welded around the circumference of a steel roller. Sawed joints shall be constructed using an early entry or wet saw.

1.05 Submittals: Prior to commencement of the work Contractor shall submit the following:

A. Concrete materials:

1. Proposed concrete mixture proportions including all material weights, volumes, density (unit weight), water cement ratio, and void content.

2. Aggregate type, source and grading.

3. Cement, fly ash and admixture manufacturer certifications B. Qualifications: Evidence of qualifications listed under Quality Assurance.

C. Project details: Specific plans, details, schedule, construction procedures and quality control plan.

D. Subcontractors: List all materials suppliers and subcontractors to be used on the project.

1.06 Test Panels: Prior to construction, test panel(s) shall be placed and approved by the City.

A. Test panel(s) shall be constructed in accordance with the plans and specifications. A minimum 225 sq. ft panel size shall be placed, jointed and cured using materials, equipment, and personnel proposed for the project.

B. Test panel(s) cost and removal, if necessary, shall be included as a line item in the contract proposal and contract.

C. Quality: Test panels shall have acceptable surface finish, joint details, thickness, porosity and curing procedures and shall comply with the testing and acceptance standards listed in the Quality Control section of this specification.

D. If test panels placed at the site are found to be deficient in thickness, density (unit weight) or percentage of voids, or of an unacceptable appearance, they shall be removed at contractor’s expense and taken to an approved landfill or recycling facility. If test panels are found to be satisfactory, they may be left inplace and included in the completed work.

PART 2 MATERIALS

2.01 Cement: Portland cement Type II or V conforming to ASTM C150 or Portland cement Type IP or IS conforming to ASTM C595.

2.02 Supplementary Cementitious Materials:

A. Class F Fly ash conforming to ASTM C618
B. Ground Iron Blast-Furnace Slag conforming to ASTM C989

2.03 Chemical Admixtures:

A. Air entraining agents shall comply with ASTM C260.

B. Chemical Admixtures shall comply with ASTM C494.

C. Hydration stabilizers are permitted to be used when it is necessary to increase concrete placement time to 90 minutes and improve finishing operations.

2.04 Aggregates:

A. Coarse aggregate shall comply with ASTM C33. Size 8 (3/8” to No. 16) or Size 89 (3/8 in. to No. 50) shall be used unless an alternate size is approved for use based on meeting the project requirements. Fine aggregate complying with ASTM C33, if used, shall not exceed 3 cu. ft.

B. Larger aggregate sizes may increase porosity but can decrease workability. Avoid well graded aggregates as they may reduce porosity, and may not provide adequate void content.

C. Where available, natural rounded aggregates are recommended.

2.05 Water: Water shall comply with ASTM C 1602.

2.06 Mixture Proportions: Contractor will submit the composition of the proposed concrete mixtures to the City’s representative for review and/or approval and submittals shall comply with the following provisions unless an alternative composition is demonstrated to comply with the project requirements.

A. Cementitious Content: For pedestrian pavements, total cementitious shall not be less than 600 lbs/cy.

B. Supplementary cementitious content: Fly ash: 25% maximum. Slag: 50% maximum C. Water / Cementitious Ratio: Maximum 0.35 for pedestrian pavements.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
PERVIOUS CONCRETE 34 12 43 -3
D. Aggregate Content: The bulk volume of aggregate per cubic yard shall be equal to 27 cubic foot when calculated from the dry rodded density (unit weight) determined in accordance with ASTM C29 jigging procedure.

D. Admixtures: Admixtures shall be used in accordance with the manufacturer’s instructions and recommendations.

E. Mix Water: The quantity of mixing water shall be established to produce a pervious concrete mixture of the desirable workability to facilitate placing, compaction and finishing to the desired surface characteristics.

PART 3 EXECUTION
3,01 Subgrade:

A. Material: The top 6 inches shall be composed of granular or gravelly soil that is predominantly sandy with no more than a moderate amount of silt or clay. Granular sub-base may be placed over the subgrade.

B. Permeability: Subgrade shall have a minimum permeability of 0.5 inch per hour determined in accordance with ASTM D3385.

C. Compaction: Compact sub-grade to a minimum 90% and a maximum 95%. Over-compaction can inhibit subgrade percolation. Compaction shall be in accordance with ASTM D1557.

D. Fill: If fill material is required to bring the subgrade to final elevation, it shall be clean and free of deleterious materials. It shall be placed in 6-inch maximum layers, and compacted by a mechanical vibratory compactor to a minimum density of 90% in accordance with ASTM D1557.

E. Moisture: The subgrade moisture content shall be 1% - 3% above optimum as determined by ASTM D1557.

F. Verify subgrade preparation, grade, and conduct permeability & density tests for conformance to project requirements.

3.02 Formwork:

A. A. Form materials are permitted to be of wood or steel and shall be of width to the depth of the pavement. Forms shall be of sufficient strength and stability to support mechanical equipment without deformation of plan profiles following spreading, strike-off and compaction operations. Forms may have a removable spacer of ½” to ¾” thickness placed above the depth of pavement. The spacers shall be removed following placement and vibratory strike-off to allow roller compaction.

B. The AC road pavement, adjacent to the PCC pervious concrete, shall be saw cut a minimum of 12” from the back of driveway to facilitate the PCC forming process and ensure a smooth join. All forms shall be removed from the site and necessary backfill and asphalt replaced at location within 48 hours of concrete pour. Irrespective of thickness of existing pavement, the AC patch shall consist of six (6) inches of asphalt concrete, Type III / C2 (PG-64-10) on six (6) inches of Class 2 Aggregate Base.

3.03 Mixing and Hauling:

A. Production: Pervious concrete shall be manufactured and delivered in accordance with ASTM C 94.

B. Mixing: Mixtures shall be produced in central mixers or in truck mixers. When concrete is delivered in agitating or non-agitating units, the concrete shall be mixed in the central mixer for a minimum of 1.5 minutes or until a homogenous mix is achieved. Concrete mixed in truck mixers shall be mixed at the speed designated as mixing speed by the manufacturer for 75 – 100 revolutions.

C. Transportation: The pervious concrete mixture may be transported or mixed on site and discharge of individual loads shall be completed within one (1) hour of the introduction of mix water to the cement.

Delivery times may be extended to 90 minutes when a hydration stabilizer is used.

D. Discharge: Contractor will visually inspect each truckload for consistency of concrete mixture. Water addition is permitted at the point of discharge to obtain the required mix consistency provided a measurable quantity is used before more than 0.5 cubic yard of concrete is discharged. A minimum of 30 revolutions at the manufacturer’s designated mixing speed shall be required following the addition of any water to the mix. Discharge shall be a continuous operation and shall be completed as quickly as possible.

Concrete shall be deposited as close to its final position as practical and such that discharged concrete is incorporated into previously placed plastic concrete.

3.04 Placing and Finishing:

A. Contractor shall provide either slip form or vibratory form riding equipment to place the concrete unless otherwise approved by the City Inspector or Engineer in writing. Internal vibration shall not be permitted.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
PERVIOUS CONCRETE 34 12 43 -4
Unless otherwise permitted placement procedures shall utilize a mechanical vibratory screed or a roller screed (Bunyan screed) to strike off the concrete ½” to 3/4” above final height, utilizing the form spacers described in Formwork. Except for small, hand formed areas, strike-off by non-vibratory means (wooden 2x4 screeds shall not be permitted.)
B. Placed concrete shall not be disturbed while in the plastic state. Low spots after the screeding operation shall be filled up and tamped with hand tampers.

C. Following strike-off, remove spacers and compact the concrete to the form level, utilizing a steel roller, a plate compactor or other method approved by the City. Contractor shall take care during compaction, that sufficient compactive force is achieved without excessively working the concrete surface that might result in sealing off the surface porosity.

D. Hand tampers shall be used to compact the concrete along the slab edges immediately adjacent to the forms. After compaction, inspection and repair, no further finishing shall be performed on the concrete.

Surface curing shall begin immediately.

E. Contractor shall compact the pervious concrete pavement to the required cross-section and shall not deviate more than +/- 3/8 inch in 10 feet from profile grade.

3.05 Jointing
A. Joints in pervious pavements can be precluded at the option of the City. Control (contraction) joints shall be installed at regular intervals not to exceed 40 feet, or two times the width of the placement. The control joints shall be installed at ¼ the depth (to a maximum depth of 1½”) of the thickness of the pavement.

These joints can be installed in the plastic concrete or saw cut after the concrete has hardened.

B. Jointing plastic concrete: Joints installed in the plastic concrete shall be constructed utilizing a small roller as described in the Special Equipment section of this specification. When this option is used, Contractor shall perform immediately after roller compaction and prior to curing.

C. Jointing hardened concrete: Saw-cuts shall be made as soon as the pavement has hardened sufficiently to prevent raveling and uncontrolled cracking. Early entry sawing occurs later with pervious concrete than with conventional concrete. For either method, the curing cover shall be removed and the surface kept misted to prevent moisture loss. After sawing the curing cover shall be securely replaced for the remainder of the curing cycle.

D. Transverse construction joints: Transverse construction joints shall be installed whenever placing is suspended for 30 minutes or whenever concrete is no longer workable.

E. Isolation joints: Isolation joints shall be used when abutting fixed vertical structures such i.e. light pole bases, building foundations, etc. Isolation material shall be positioned before concrete is placed and shall be the depth of the pavement section.

3.06 Curing:

A. Curing procedures shall begin no later than 20 minutes after final placement operations have been completed. The pavement surface shall be covered with a minimum of six (6) mil thick polyethylene sheet or other approved covering material. The cover shall overlap all exposed edges and shall be secured to prevent dislocation due to winds or adjacent traffic conditions. For additional guidance on hot weather concreting, see ACI 305.

B. The low water/cement ratio and high amount of exposed surface of pervious concrete makes it especially susceptible to drying out. Immediately after screeding, the surface shall be kept moist and evaporation prevented using a spray applied curing compound and/or evaporation retarder immediately after screeding.

C. The curing cover shall remain securely in place for a minimum of 7 days. No vehicular traffic shall be permitted on the pavement until curing is complete and no truck traffic shall be permitted for at least 14 days. The City has the option of permitting earlier traffic opening times.

3.07 Quality Control:

A. At the City’s discretion, they can employ a testing laboratory that conforms to the requirements of ASTM E329 and ASTM C1077. All personnel engaged in testing shall be certified by the American Concrete Institute as ACI Concrete Field Technicians or equivalent.

B. Traditional Portland cement pavement testing procedures based on strength and slump control are not applicable to this type of pavement material.

C. Concrete tests shall be performed for each 150 cubic yards or fraction thereof with a minimum of one test for each day’s placement.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
PERVIOUS CONCRETE 34 12 43 -5
D. Plastic concrete shall be sampled in accordance with ASTM C 172 and density (unit weight) measured in accordance with ASTM C 138. The density (unit weight) of the delivered concrete shall be +/- 5 pcf of the design density (unit weight).

E. Plastic void content shall be calculated as per ASTM C138, Gravimetric Air Determination and compared to the void percentage required by the Hydraulic design. Unless otherwise specified, Void content shall be between 15% and 25%.

F. Hardened concrete shall be tested for in-place infiltration rate, thickness, and void content. The infiltration rate shall not be less than 100 inches per hour when tested using the procedure described in paragraph

3.07.F.1. One set of three cores per 150 cy of concrete placed on one day or fraction thereof shall be drilled in accordance with ASTM C 42
G. The infiltration test shall be performed in accordance with the following procedure:
a. The apparatus shall consist of a:
i. One gallon, minimum size, water container with a spout. The spout shall be able to produce a stream with a circular cross-section and large enough in diameter to discharge the entire contents of the container in 20 seconds or less. ii. Stopwatch capable of indicating elapsed time to the nearest second. iii. Tape measure of at least 0.95 m (36 inches) that is graduated in 5 mm (1/4 inch) increments or smaller.
iv. The water shall be free of suspended solids. The volume of water shall be determined to two significant figures
v. The testing procedure is:

1. Place a pre-measured amount of water into the container.

2. Pour the water onto the pervious concrete surface. Control the discharge rate by manually adjusting the angle of the spout so that the pooling of water on the concrete surface is between 25.4 cm to 76.2 cm (10 to 30 inches).

Pour the entire contents of the container onto one spot and hold the spout over the spot until the pool of water vanishes.

3. Start the stopwatch when the water initially touches the concrete surface and stop it when the pool disappears from the surface.

4. Measure the longest dimension of the dampened area. Measure the width of the pool perpendicular to the first measurement.

5. Repeat this procedure in a minimum of 4 separate locations. vi. The calculation of the Infiltration Capacity shall be as follows:

1. The formula for SI Units is: IC= (V) (14.4X106)/ (pi) (d1) (d2) (t) inches per hour.

2. The formula for U.S. Standard Measures is:

IC=(V)(3,326,400)/(pi)(d1)(d2)(t) inches per hour
Where:

IC is Infiltration Capacity
V is the volume of water in gallons or liters
d1 and d2 are the dimensions that were determined in part 4 Pi is about 3.14159

3. The test report shall include at a minimum:
a. The time and date of testing.
b. The name and affiliation of the person performing the test. c. The location of the site being tested.
d. The location of each site tested.
e. The volume of water used at each test site.
f. The length of the two measurements taken at each site. g. The discharge time for the water at each location.
h. The infiltration capacity at each location.
i. The average infiltration capacity for the site.

H. The cores when measured for length shall not be more than ½ inch less than the specified design thickness.

I. The cores shall be tested for void content using the following procedure:
a. Weight of saturated, surface-dry (ssd) specimen in air, B

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
PERVIOUS CONCRETE 34 12 43 -6
b. Weight of ssd specimen in water, C
c. Determine bulk specific gravity (ssd), B/(B-C)
d. Weight in water of ssd specimen wrapped in parafilm or saran wrap, D e. Volume of core wrapped in parafilm or saran wrap by displacement, B-D = Vc f. Volume of solid part of core (aggregate), B-C = Vs
g. Percentage of permeable voids, ((Vc-Vs)/Vc)*100
END F SECTION 34 12 43

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
RESILIANT PLAYGROUND SURFACING 32 18 16-1
SECTION 32 18 16

RESILIENT PLAYGROUND SURFACING
PART 1 - GENERAL

1.4 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.5 SUMMARY
A. This section includes the following:

1. SpectraPour Supreme Playground Surfacing System

2. Mfr. / Installer (Or Equal):
• SpectraTurf / 555 South Promenade Avenue, #103 / Corona, Ca 92879 / 951.736.3579 / 951.734.3630 fax / info @specraturf.com / www.spectraturf.com

1.6 RELATED SECTIONS
A. Pervious Concrete
B. Drainage and Sewer Piping

1.7 REFERENCES
A. American Society for Testing and Materials (ASTM):

1. ASTM D412 Standard Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers-Tension.

2. ASTM D624 Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers.

3. ASTM D2047 Standard Test Method for Static Coefficient of Friction of Polish-Coated Floor Surfaces as Measured by the James Machine.

4. ASTM D2859 Standard Test Method for Flammability of Finished Textile Floor Covering Materials.

5. ASTM E303 Standard Test Method for Measuring Surface Frictional Properties Using the British Pendulum Tester.

6. ASTM F1292 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment.

7. ASTM F1951 Standard Specification for Determination of Accessibility of Surface Systems Under and Around Playground Equipment

1.8 SYSTEM DESCRIPTION
A. Performance Requirements: Provide a 2 layer rubber-urethane playground surfacing system which has been designed, manufactured and installed to meet the following criteria:

1. Shock Attenuation (ASTM F1292):

2. Gmax: Less than 200.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
RESILIANT PLAYGROUND SURFACING 32 18 16-2

3. Head Injury Criteria: Less than 1000.

4. Flammability (ASTM D2859): Pass.

5. Tensile Strength (ASTM D412): 60 psi (413 kPa).

6. Tear Resistance (ASTM D624): 140%.

7. Water Permeability: 0.4 gal/yd2/second.

8. Accessibility: Comply with requirements of ASTM F1951.

1.9 SUBMITTALS
A. General: Submit listed submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedures Section.

B. Product Data: Submit manufacturer’s product data and installation instructions.

C. Verification Samples: Submit manufacturer’s standard verification samples of 6" x 6" minimum.

D. Quality Assurance/Control Submittals: Submit the following:

1. Certificate of qualifications of the playground surfacing installer.

E. Closeout Submittals: Submit the following:

1. Warranty documents specified herein.

1.10 QUALITY ASSURANCE
A. Qualifications: Utilize an installer approved and trained by the manufacturer of the playground surfacing system or a direct employee of the manufacturer’s installation division, having experience with other projects of the scope and scale of the work described in this section.

B. Certifications: Certification by manufacturer that installer is an approved applicator of the playground surfacing system.

C. International Play Equipment Manufacturers Association (IPEMA) certified.

1.11 DELIVERY, STORAGE & HANDLING
A. General: Comply with Division 1 Product Requirement Section.

B. Delivery: Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.

C. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at a minimum temperature of 40 degrees F (4 degrees C) and a maximum temperature of 90 degrees F (32 degrees C).

1.12 PROJECT SITE CONDITIONS
A. Environmental Requirements: Install surfacing system when minimum ambient temperature is 40 degrees F (1 degree C) and maximum ambient temperature is 95 degrees F (32 degrees C). Exception to the temperature requirements can be made by the manufacturer of the surfacing system. Do not install in steady or heavy rain.

1.13 WARRANTY
A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions.

B. Proper drainage is critical to the longevity of the SpectraPour Supreme surfacing system. Inadequate drainage

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
RESILIANT PLAYGROUND SURFACING 32 18 16-3
will cause premature breakdown of the poured system in affected areas; and void the warranty.

1. Warranty Period: Seven (7) years from date of completion of work.

PART 2 PRODUCTS

2.2 SPECTRATURF SUPREME POURED-IN-PLACE PLAYGROUND SURFACING SYSTEM A. Manufacturer: SpectraTurf, Inc.

1. Contact: 555 South Promenade Avenue, #103, Corona, CA 92879; Telephone: (800) 875-5788; Fax: (951) 734-3630; E-mail: [email protected] website: http://www.spectraturf.com.

B. Proprietary Products/Systems. SpectraPour Supreme playground surfacing system, including the following:

1. SpectraPour Supreme Primer:
a. Material: Urethane.

2. SpectraPour Supreme Basemat:
a. Material: Blend of 100% recycled SBR (styrene butadiene rubber) and urethane. b. Thickness: 2.5".

3. SpectraPour Supreme Top Surface:
a. Material: Blend of Spectra TPV 0.5 to 1.5 mm granules and aliphatic urethane binder. b. Top Surface Thickness: minimum 1/2", maximum 5/8".
c. Colors: Refer to Plans.
d. Dry Static Coefficient of Friction (ASTM D2047): 1.0. e. Wet Static Coefficient of Friction (ASTM D2047): 0.9. f. Dry Skid Resistance (ASTM E303): 89.
g. Wet Skid Resistance (ASTM E303): 57.

2.3 MIXES
A. Required mix proportions by weight:

1. Basemat: 16+% urethane (as ratio: 14% urethane divided by 86% rubber). 14% urethane, 86% rubber (based on entire rubber & urethane mix).

2. Top Surface: 25% urethane (ratio: 20% urethane divided by 80% TPV). 20% urethane, 80% TPV (based on entire rubber & urethane mix).

PART 3 EXECUTION

3.5 MANUFACTURER’S INSTRUCTIONS
A. Comply with the instructions and recommendations of the playground surfacing manufacturer.

3.6 EXAMINATION
A. Substrate preparation must be in accordance with surfacing manufacturer’s specification. New asphalt must be fully cured – up to 30 days. New concrete must be fully cured – up to 7 days.

B. Proper drainage is critical to the longevity of the SpectraPour Supreme surfacing system. Inadequate drainage will cause premature breakdown of the poured system in affected areas; and void the warranty.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
RESILIANT PLAYGROUND SURFACING 32 18 16-4

3.7 PREPARATION
A. Surface Preparation: Using a brush or short nap roller, apply primer to the substrate perimeter and any adjacent vertical barriers such as playground equipment support legs, curbs or slabs that will contact the surfacing system at the rate of 300 ft2/gal.

3.8 INSTALLATION
A. Do not proceed with playground surfacing installation until all applicable site work, including substrate preparation, fencing, playground equipment installation and other relevant work, has been completed.

B. Basemat Installation:

1. Using screeds and hand trowels, install the basemat at a consistent density of 29 pounds, 1 ounce per cubic foot to the specified thickness.

2. Allow basemat to cure for sufficient time so that indentations are not left in the basemat from applicator foot traffic or equipment.

3. Do not allow foot traffic or use of the basemat surface until it is sufficiently cured.

C. Primer Application: Using a brush or short nap roller, apply primer to the basemat perimeter and any adjacent vertical barriers such as playground equipment support legs, curbs or slabs that will contact the surfacing system at the rate of 300 ft2/gal (7.5 m2/L).

D. Top Surface Installation:

1. Using a hand trowel, install top surface at a consistent density of 58 pounds, 9 ounces per cubic foot to a nominal thickness of 1/2".

2. Allow top surface to cure for a minimum of 72 hours.

3. At the end of the minimum curing period, verify that the top surface is sufficiently dry and firm to allow foot traffic and use without damage to the surface.

4. Do not allow foot traffic or use of the surface until it is sufficiently cured.

3.5 PROTECTION
A. Protect the installed playground surface from damage resulting from subsequent construction activity on the site

END OF SECTION

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TREE AND LANDSCAPE PRESERVATION 32 34 01 -1
SECTION 32 34 01

TREE AND LANDSCAPE PRESERVATION
PART 1 - GENERAL

1.1 TREE PROTECTION
A. The park is populated with trees and shrubs and the CONTRACTOR shall protect all existing trees and shrubs in place and as indicated on the plans. The CONTRACTOR shall retain an Arborist to work with the City to adhere to all Tree and Landscape Preservation Specifications as set forth in this Section. If any trees and shrubs are damaged above and beyond what is reasonable due to project construction, the Contractor Arborist shall consult with the to determine the cost replacement based on trunk formula method.

B. Any Work considered under this Section shall be considered incidental and no separate pay item will be considered under this contract.

PART 2 - PRODUCTS

2.01 Not Used.

PART 3 - EXECUTION

3.1 DEMOLITION AND SITE CLEARING
A. The CONTRACTOR shall coordinate with Contractor Arborist, and City Inspector to accomplish construction of the park as it relates to existing trees and shrubs, preservation and protection of these resources.

B. The following work shall be accomplished before any demolition or site clearing activity occurs in the area encompassed by a line 10 feet outside the dripline of any tree to be protected in the project.

1. Conduct a pre-construction meeting with the Contractor, City Inspector, Parks Project Manager, City arborist, Contractor Arborist, and Landscape Architect to review construction procedures, access, haul routes and tree protection measures. All trees and shrubs to be preserved and those projected to be removed shall be tagged for this meeting and Contractor shall receive approval of those designations prior to any potentially damaging work being done in the vicinity of those plants.

2. Contractor and Contractor Arborist shall stake the limits of tree and shrub preservation zone (TPZ) and obtain approval from the City Inspector, Parks Project Manager, and City arborist.

3. Contractor shall install six-foot high chain link fences with posts supported on stands to delineate the TPZ. Fence shall remain upright and in good condition until all work has been completed. Fencing may not be removed or relocated without the approval of the City Inspector, Parks Project Manager, and City arborist. Fencing shall be approved by City Inspector, Parks Project Manager, and City arborist prior to purchasing, delivery, and installation. Fencing shall be kept in original installed condition throughout the duration of construction. If fencing is ripped, torn, removed, or dislocated during construction, Contractor shall repair immediately upon notification by the City Inspector, Parks Project Manager, and City arborist.

4. Contractor shall report any damage to a tree or shrub due to construction activities to the City Inspector, Parks Project Manager, and City arborist within one (1) hour of the incident so that remedial action can be taken and appropriate treatments can be applied immediately. City Parks shall coordinate with City Inspector, Parks Project Manager, and City arborist and Contractor Arborist to determine replacement as required. All remedies shall be at the Contractor's expense.

5. When construction access roads, paths or activities must occur over the root zone area of a tree, a 6-inch bed of mulch (wood chips) shall be placed over the root zone area of the tree to prevent soil compaction.

The mulch material shall be replenished to maintain its thickness of 6 inches at all times, until the end of

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TREE AND LANDSCAPE PRESERVATION 32 34 01 -2
the construction activity, after which it shall be removed.

6. When temporary clearance is needed for access under a tree, branches shall be carefully tied back as directed by City Inspector, Parks Project Manager, and City arborist.

3.2 CONSTRUCTION
A. Contractor shall make every effort to preserve existing trees and shrubs during the course of the project. No materials, equipment, spoils, waste or washout water shall be deposited, stored or parked within the TPZ.

Undue compaction of the TPZ and root zones shall be avoided at all times.

1. ACTIVITIES PROHIBITED WITHIN THE TPZ INCLUDE:
a. Parking vehicles or equipment, storage of building materials, refuse, or excavated soils, or dumping poisonous material on or around trees, shrubs and roots. Poisonous materials include, but are not limited to paint, petroleum products, concrete, stucco mix, dirty water or any material that may be harmful to plant health
b. The use of tree trunks as a backstop, winch support, anchorage, as a temporary power pole, signpost or other similar function
c. Cutting of tree roots by utility trenching, foundation digging, placement of curbs and trenches, or other miscellaneous excavations without prior approval of the project arborist d. Soil disturbance or grade change
e. Drainage changes

2. ACTIVITIES PERMITTED OR REQUIRED WITHIN THE TREE PROTECTIVE ZONE INCLUDE:
a. Mulch: during construction, wood chips may be spread within the TPZ to a four-to-six-inch depth, leaving the trunk clear of mulch. this will aid in inadvertent soil compaction and moisture loss. Mulch shall be 2-inch unpainted, untreated shredded wood or approved material. b. Root buffer: when areas under the tree canopy cannot be fenced, a temporary buffer is required and shall cover the root zone and remain in place at the specified thickness until the final grading stage.

The protective buffer shall consist of shredded wood chips spread over the roots at a minimum of 6- inches in depth (keeping the trunk clear of chips) and layered by 3/4-inch quarry gravel to stabilize the 3/4-inch plywood sheets laid on top. Steel plates can also be used. c. Irrigation, aeration, fertilization, mycorrhizae treatments or other beneficial practices that have been specifically approved for use within the TPZ may be accomplished prior to construction with observation by City Arborist.

B. Horizontal directional drilling (HDD) shall be used when installation of utility lines will interfere with tree roots within the area encompassed by a line 10' outside the dripline. If trenching appears to be unavoidable, Contractor shall meet with the City to discuss construction means and methods and receive approval before starting work. Contractor shall avoid laying back trench, so root systems are not impacted and soil is not compacted. An “approved equal” method for utility installation shall be considered.

C. TREE ROOTS

1. Root Severance: No roots shall be cut without approval of City Parks. If roots are approved to be cut, they shall be cut cleanly with a sharp saw to sound wood and flush with the trench side. All ripped and/or torn roots shall be cut clean. Extreme care / caution shall be taken over / around all roots.

2. Excavation: Any approved excavation, demolition, or extraction of material shall be performed with equipment that is placed outside the TPZ. Hand digging is a permitted method for excavation within the TPZ.

3. Heavy Equipment: Use of backhoes, ditch-witches, steel tread tractors or other heavy vehicles within the

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TREE AND LANDSCAPE PRESERVATION 32 34 01 -3
TPZ is prohibited unless approved by CITY Parks. if allowed, a protective root buffer is required.

4. No vehicles may park within the TPZ.

D. COMPACTION

1. There are three conditions that will require compaction. Refer to Green Book section 301 and / or 306 and Cal Trans 2311 and Standard Plan #1801.
a. CONDITION 1:
• Where the underground utilities are installed under pavement (roadway, sidewalk or other existing paved surface), backfill the trench and compact to Standard Plans for Public Works Construction requirements.
b. CONDITION 2:
• Where the underground utilities are installed in soil under canopy (drip line) of existing trees, backfill the trench up to 18-inches from finish grade and compact to 90% relative compaction.

The top 18-inches shall be left uncompacted to less than 90%, to promote root generation.

Generally, wheel rolling with a loader is sufficient. However, Contractor is responsible to repair soil settlement to meet existing grade, and to provide adequate drainage to the area. c. CONDITION 3:
• Where the underground utilities are installed in open landscape areas, outside of tree drip lines, backfill the trench to finish grade, and compact to Standard Public Works Construction requirements. Contractor is responsible to repair soil settlement to meet existing grade, and to provide adequate drainage to the area.

2. Soil Compaction Mitigation: To prevent negligent encroachment into the tree protection zone, trees to be preserved during construction must always have the specified type of protection fences in place. Removal of fences, even temporarily, to allow deliveries or equipment access is not allowed unless approved by City Arborist and a root buffer is installed. The root buffer components: mulch, gravel, and plywood, must be maintained continually to assure its effectiveness against soil compaction.

3. Dust Control: During periods of extended drought, wind or grading, trunks, limbs, and foliage shall spray with water to remove accumulated construction dust, as directed by City Arborist.

E. TREE MAINTENANCE DURING CONSTRUCTION

1. Soil Compaction Mitigation: To prevent negligent encroachment into the tree protection zone, trees to be preserved during construction must always have the specified type of protection fences in place. Removal of fences, even temporarily, to allow deliveries or equipment access is not allowed unless approved by CITY ARBORIST and a root buffer is installed. The root buffer components: mulch, gravel and plywood, must be maintained continually to assure its effectiveness against soil compaction.

2. Dust Control: During periods of extended drought, wind or grading, trunks, limbs and foliage shall spray with water to remove accumulated construction dust, as directed by City Arborist.

F. DAMAGE TO TREES AND SHRUBS

1. Reporting Injury to Trees: Any damage or injury to trees and shrubs shall be reported as soon as possible to the City Inspector, Parks Project Manager, and City arborist. Injuries to roots and branches must be repaired immediately.

2. If a tree or shrub designated to remain is removed or irreversibly damaged as determined by the City Arborist the Contractor may be required to install a replacement tree or shrub matching in size, quality, and variety. If an acceptable replacement tree or shrub is not available, the Contractor may be required to pay damages to City Parks for the value of the damaged plant in accordance with the guidelines set forth in the Guide for Plant Appraisal, 9th edition, using the trunk formula method.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
TREE AND LANDSCAPE PRESERVATION 32 34 01 -4
END OF SECTION 32 34 01

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -1
SECTION 329000

LANDSCAPE PLANTING

1. GENERAL

1.01 GENERAL
The requirements of the “General Conditions of the Contract” and of Division 1, “General Requirements”, shall apply to all work of this Section with the same force and effect as though repeated in full herein.

1.02 SCOPE OF WORK
A. Work Included:

1. Providing and preparing soil and soil mixes.

2. Planting, including, trees, shrubs and sodded lawns.

3. Staking.

4. Tree Preservation.

B. Related Work Described Elsewhere:

1. Irrigation System Section [328800].

2. Tree and Plant Protection [015639].

3. Landscape Finish Grading [314000]

1.03 QUALITY ASSURANCE
A. Source Quality Control:

1. Submit documentation to Landscape Architect at least forty-five (45) days after award of Contract that all plant material is available. Contractor shall be responsible for all material listed on plant list. Any and all substitutions due to availability must be requested in writing prior to confirmation of ordering. All materials shall be subject to inspection by Landscape Architect at any time after confirmation of ordering.

2. Plants shall be subject to inspection and approval of Landscape Architect at place of growth or upon delivery for conformity to specifications. Such approval shall not impair the right of inspection and rejection during progress of the work. Submit written request for inspection of plant material at place of growth to Landscape Architect. Written request shall state the place of growth and quantity of plants to be inspected. Landscape Architect reserves the right to refuse inspection at this time if, in his judgment, a sufficient quantity of plants is not available for inspection.

3. The Contractor shall submit specifications of any item being used on site upon the request of the Landscape Architect.

B. Standards:

1. Provide plants and planting material meeting or exceeding specifications of Federal, State and County laws requiring inspection for plant disease and insect control.

2. Provide quality and size conforming to current edition of “Horticultural Standards” for number one nursery stock as adopted by the American Association of Nurserymen.

3. Provide plants which are true to name. Tag one of each bundle of lot with the name and size of plants in accordance with the standards of practice of the American Association of Nurserymen.

4. In all cases, botanical names shall take precedence over common names.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -2
C. Workmanship:

Perform work in accordance with the best standards of practice for landscape work and under the continual supervision of competent foreman capable of interpreting the drawings and specifications. Quantities and types:

Plant materials shall be furnished in the quantities and / or spacing as shown or noted for each location, and shall be of the species, kinds, sizes, etc., as symbolized and / or described in the “List of Plant Materials,” all as indicated on the drawings.

D. Verification of dimensions and quantities:

All scaled dimensions are approximate. Before proceeding with any work, carefully check and verify all dimensions and quantities and immediately inform the Landscape Architect of any discrepancy between the drawings and/or specifications and actual conditions. No work shall be done in any area where there is any such discrepancy until approval for same has been given by the Landscape Architect.

E. Agricultural Soils Testing:

1. ŶĂŶĂůLJƐŝƐŽĨĞdžŝƐƚŝŶŐŽŶͲƐŝƚĞƐŽŝů͕ŝŵƉŽƌƚƚŽƉƐŽŝů͕ĂŶĚůŝŐŚƚǁĞŝŐŚƚƉůĂŶƚĞƌƐŽŝůŝƐƌĞƋƵŝƌĞĚ ƉƌŝŽƌƚŽďĞŐŝŶŶŝŶŐƉůĂŶƚŝŶŐǁŽƌŬĂŶĚƉƵƌĐŚĂƐŝŶŐƚŚĞƐĂŵĞƉƌŽĚƵĐƚƐŽƌŵĂƚĞƌŝĂůƐ͘

2. The testing laboratory shall be Wallace Laboratories Inc. 365 Coral Circle, El Segundo, CA 90245, 310•615•0116. Tests shall be paid for by the Owner. The quantity and location of on-site soil samples to be tested shall be determined by the Landscape Architect after rough grading operations are complete.

3. The quantity and location of on-site soil samples to be tested shall be determined by the Landscape Architect. Provide

1.04 JOB CONDITIONS
A. Perform actual planting only when weather and soil conditions are suitable in accordance with locally accepted practice.

1.05 SUBMITTALS
A. WƌŽĚƵĐƚĚĂƚĂ͗

1. DĂƚĞƌŝĂůƐůŝƐƚŽĨŝƚĞŵƐƉƌŽƉŽƐĞĚƚŽďĞƉƌŽǀŝĚĞĚƵŶĚĞƌƚŚŝƐ^ĞĐƚŝŽŶ͘

2. ŽŵƉůĞƚĞĚĂƚĂĚĞŵŽŶƐƚƌĂƚŝŶŐĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞƐƉĞĐŝĨŝĞĚƌĞƋƵŝƌĞŵĞŶƚƐ͘dŚŝƐƐŚĂůůŶŽƚŝŶ ĂŶLJǁĂLJďĞĐŽŶƐƚƌƵĞĚĂƐƉĞƌŵŝƚƚŝŶŐƐƵďƐƚŝƚƵƚŝŽŶƐ͘

3. ^ƵďŵŝƚƐĂŵƉůĞƐŽĨĞĂĐŚŽĨƚŚĞŵĂƚĞƌŝĂůƐůŝƐƚĞĚŝŶWĂƌƚϮʹ͚WƌŽĚƵĐƚƐ͛ĂƐĚĞƚĞƌŵŝŶĞĚďLJƚŚĞ >ĂŶĚƐĐĂƉĞƌĐŚŝƚĞĐƚ͘
B. ĞƌƚŝĨŝĐĂƚŝŽŶ͗
WƌŽǀŝĚĞĂĐĞƌƚŝĨŝĐĂƚĞǁŝƚŚĞĂĐŚĚĞůŝǀĞƌLJŽĨďƵůŬŵĂƚĞƌŝĂů͕ƐƚĂƚŝŶŐƚŚĞƐŽƵƌĐĞ͕ƋƵĂŶƚŝƚLJ͕ĂŶĚƚLJƉĞŽĨ ŵĂƚĞƌŝĂůĂŶĚƐƚĂƚŝŶŐƚŚĂƚƚŚĞŵĂƚĞƌŝĂůĐŽŶĨŽƌŵƐǁŝƚŚƚŚĞƐƉĞĐŝĨŝĞĚƌĞƋƵŝƌĞŵĞŶƚƐ͘

1. &ŽƌďƵůŬĚĞůŝǀĞƌĞĚŽƌŐĂŶŝĐĨĞƌƚŝůŝnjĞƌ͕ĂůƐŽƐŚŽǁŽŶƚŚĞĐĞƌƚŝĨŝĐĂƚĞŽĨǀŽůƵŵĞ͕ŶĞƚǁĞŝŐŚƚĂŶĚ ƉĞƌĐĞŶƚĂŐĞƐŽĨŶŝƚƌŽŐĞŶĂŶĚƉŚŽƐƉŚŽƌƵƐĂŶĚƉŽƚĂƐƐŝƵŵ͘

2. &ŽƌŽƚŚĞƌĨĞƌƚŝůŝnjĞƌƐĂŶĚƐŽŝůĐŽŶĚŝƚŝŽŶƐŝŶĐŽŶƚĂŝŶĞƌƐ͕ƐŚŽǁŽŶƚŚĞĐĞƌƚŝĨŝĐĂƚĞƚŚĞƚŽƚĂů ƋƵĂŶƚŝƚŝĞƐďLJǁĞŝŐŚƚĂŶĚǀŽůƵŵĞĨŽƌĞĂĐŚŵĂƚĞƌŝĂů͘

1.06 WZKhd
>/s
Zz͕^dKZ'
E,E>/E'
A. ĞůŝǀĞƌLJ͗

1. ĞůŝǀĞƌĨĞƌƚŝůŝnjĞƌƚŽƐŝƚĞŝŶŽƌŝŐŝŶĂůƵŶŽƉĞŶĞĚĐŽŶƚĂŝŶĞƌƐďĞĂƌŝŶŐŵĂŶƵĨĂĐƚƵƌĞƌ͛ƐŐƵĂƌĂŶƚĞĞĚ ĐŚĞŵŝĐĂůĂŶĂůLJƐŝƐ͕ŶĂŵĞ͕ƚƌĂĚĞŵĂƌŬ͕ĂŶĚĐŽŶĨŽƌŵĂŶĐĞƚŽ^ƚĂƚĞ>Ăǁ͘

2. The Contractor shall furnish Landscape Architect with copies of receipts for all amendments specified in Section 2.01 Materials or amended by the required Soils Report specified in Section 1.03 F.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -3

3. Deliver all plants with legible identification labels. a. Label trees, evergreens, bundles or containers of like shrubs, or groundcover plants.

B. State correct plant name and size indicated on plant list. a. Use durable waterproof labels with water-resistant ink which will remain legible for at least 60 days. b. Immediately remove from the job site all plants which are not true to name, and all materials which do not comply with the specified requirements.

2. Protect plant material during delivery to prevent damage to root ball or desiccation of leaves.

3. The Contractor shall notify the Landscape Architect seven (7) days in advance of delivery of all plant materials and shall submit an itemized list of the plant in each delivery.

C. Storage:

1. Store plant material in shade and protect from weather.

2. Maintain and protect plant material not to be planted within four (4) hours in a healthy, vigorous condition.

D. Handling:

The Contractor is cautioned to exercise care in handling, loading, unloading and storing of plant materials.

Plant materials that have been damaged in any way will be discarded and, if installed, shall be replaced with undamaged materials.

1.02 SAMPLES AND TESTS
Landscape Architect reserves the right to take and analyze samples of materials for conformity to specifications at any time. Contractor shall furnish samples upon request by Landscape Architect. Rejected materials shall be immediately removed from the site at Contractor’s expense. Cost of testing of materials not meeting specifications shall be paid for by Contractor.

1.03 GUARANTEE AND REPLACEMENT
Submit a written guarantee in approved form in compliance with the related requirements of General Conditions guaranteeing the work of this section against any defective materials and workmanship in compliance with the following terms, agreeing to replace any defective materials and/or workmanship at no additional cost to the owner.

A. Trees shall be guaranteed for a period of one year and shrubs, vines and ground cover for a period of six months after final approval and acceptance of the project.

B. Any plant material which dies or which is not healthy or vigorous when it has received normal care and maintenance shall be replaced within or at the end of the guarantee period and as specified in the Landscape Maintenance Specifications.

C. Any trees or other plant materials that die-back and lose the form and size as originally specified, shall be replaced even though they have taken root and are growing after the die-back.

D. The Contractor, when notified by the Landscape Architect, shall remove and replace all guaranteed plant materials which for any reason fail to meet the requirements of the guarantee. Replacement of material and plants shall be made to same specifications as ƌĞƋƵŝƌĞĚĨŽƌŽƌŝŐŝŶĂůƉůĂŶƚŝŶŐ͘ůůƌĞƉůĂĐĞŵĞŶƚƐƐŚĂůůďĞ ŐƵĂƌĂŶƚĞĞĚĂƐƐƉĞĐŝĨŝĞĚĨŽƌŽƌŝŐŝŶĂůŵĂƚĞƌŝĂůƐĨƌŽŵƚŚĞĂĐƚƵĂůĚĂƚĞŽĨƚŚĞƉůĂŶƚŝŶŐŽĨƌĞƉůĂĐĞŵĞŶƚ ŵĂƚĞƌŝĂů͘

1.04 EXISTING TREES ‘TO BE PROTECTED IN PLACE’
A. When the site is ready for clearing, existing trees designated as ‘to remain’ shall be protected from land clearing equipment and construction work. Barricades shall be erected around the tree to protect the entire dripline (an imaginary perpendicular line that extends downward from the outer-most tip of the tree branches to the ground) of the tree.

1.10 ROOT BARRIER REQUIREMENT

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -4
A. All trees within 8’ (eight feet) of any paving curbs, or bands (except for trees in tree grates) shall be installed with linear root barriers. Root barrier products for trees within 8’ (eight feet) of any sidewalks, curbs, gutters, and paving governed by or under the jurisdiction of the City, shall be that specified and approved by the City and shall be installed in accordance with the City’s standards and the manufacturers specifications, recommendations, and details.

1.11 TREE PLACEMENT AND LOCATION REQUIREMENTS
A. Trees shall be located not less than:

1. Twenty (20) feet back of beginning of curb returns at any street intersection.

2. Twenty (20) feet from lamp standards and power poles.

3. Ten (10) feet from fire hydrants.

4. Five (5) feet from service walks and driveways.

5. Five (5) feet from water meters.

2. PRODUCTS

2.01 Materials
A. The following organic, soil amendments and fertilizers are to be used for bid price basis only. Specified amendments and fertilizer specifications will be made after grading operations are complete and soil samples are tested through an agronomy laboratory, see Section 1.03F.

B. All materials shall be of standard, approved and first-grade quality and shall be in prime condition when installed and accepted. Any commercially processed or packaged material shall be delivered to the site in the original unopened container bearing the manufacturer’s guaranteed analysis. Contractor shall supply Landscape Architect with a sample of all supplied materials accompanied by analytical data from an approved laboratory source illustrating compliance or bearing the manufacturer’s guaranteed analysis:

C. Organic Amendment:

Earthworks Soil Amendments, Inc. ‘Planting Mix’, 310•802•8842 or equal.

1. Planting Mix
EarthWorks Planting Mix is pre-moistened blend of carefully selected organic compost, aged forest products, premium peat moss, pumice and chicken manure which is formulated for all landscape planting applications.

D. Soil Amendment:

1. Soil Sulfur: Agricultural grade sulfur containing a minimum of 99% sulfur (expressed as elemental).

2. Iron Sulfate: 20% Iron (expressed as metallic iron), derived from ferric and ferrous sulphate, 10% sulfur (expressed as elemental).

3. Calcium Carbonate: 95% lime as derived from oyster shells.

4. Gypsum: Agricultural grade product containing 98% minimum calcium sulphate.

Amendment: Establish ‘by Earthworks Soil Amendment Inc., 310•802•8842.

Earthworks Establish is designated to be used as a pre-plant soil amendment and contains both soluble and insoluble nutrients for immediate and long term fertilization as follows:

Analysis: 1-1.3-6.3
1% Total Nitrogen

1.3% Available Phosphoric Acid

6.3% Soluble Potash
16% Calcium

1.5% Sulfur
.75% Iron

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -5
.06% Manganese
Derived from: Rock Phosphate, composted chicken manure, sulfate of potash, gypsum, worm castings and dairy manure compost.

E. Fertilizer:

1. Planting Fertilizer: Granular form fertilizer consiting of the following percents by weight by Earthworks 7% nitrogen
1% phosphoric acid
7% potash

2. Gro-Power Planter Pot Fertilizer: Shall be Gro-Powers’ controlled release fertilizer and soil conditioner or equal in the following percents by weight.
12% nitrogen
8% phosphoric acid
8% potash
25% humus
5% humic acid

3. Planting Tablets:
a. Each tablet shall have 17 species of Endo & Ecto Mycorrizal Inoculum b. Shall be Tri-C Myco Tabs (17-9-5) tablets as manufactured by Tri- C Natural Solutions or approved equal, applied per manufacturer’s instructions.

4. Pre-Sod Fertilizer: Shall consist of the following percentage by weight and shall be mixed by a commercial fertilizer supplier:
16% hydrogen
20% phosphoric acid
8% potash

5. Sulphate of potash: 0-0-50

6. Single Super-Phosphate: Commercial product containing 18-20% available Phosphoric Pentoxide, or equal.

7. Urea Formaldehyde: 38-0-0

8. Humate plus conditioner by Tri-C Enterprises, 800•927•3311.

F. Import Top Soil:

Silt plus clay content of the import soil shall not exceed 20% by weight with a minimum 95% passing the 2.0 millimeter sieve. The sodium absorption ratio (SAR) shall not exceed 6 and the electrical conductivity (ECe) of the saturation extract of this soil shall not exceed 3.0 millimhos per centimeter at 25 degrees centigrade.

The boron content shall be no greater than 1 part per million as measured on the saturation extract. In order to ensure conformance, samples of the import soil shall be submitted to the agricultural soils testing laboratory (see section 1.03F) for analysis prior to, and following, backfilling. Do not obtain top soil form areas in which are growing noxious weeds such as morning glory oxalis Bermuda or nut grasses. Soil shall be free of deleterious and / or harmful substances and properties.

4. Nursery Grown and Collected Stock:
a. Grown under climatic conditions similar to those in locality of project. b. Container-grown stock in vigorous, healthy condition, not root-bound or with root system hardened off.
c. Use only liner stock plant material which is well established in removable containers or formed homogenous soil section.

5. Substitute plant material will not be permitted unless specifically approved in writing by the Landscape Architect.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -6

6. Sod:

Shall be Marathon II by Southland Sod Farms and shall be well established, disease-free, and weedfree sod in a healthy vigorous condition.

F. Guying and Staking Materials:

1. Wood tree stakes:

Lodge pole pine, full treated with Coppernapthanate Wood Preservative in strict accordance with Federal Spec. TT-W-572 Type 1 Composition B, 2" (mm. nominal size) diameter x 10' long, no split stakes. Stakes are to be free of loose knots or bends and are to be pointed at one end.

2. Pipe Tree Stakes:

Sch. 40 steel pipe, 1-1/2" diameter with cap, primed and painted before installation with two coats flat black exterior enamel. Touch up in field to match shop condition.

3. Ties:
a. V.I.T. Products ‘Twist brace’, 800•729•1314
TB-24 for 15 Gallon Trees
TB-36 for 24” Box Trees
TB-42 for 36” Box Trees
b. Attach to Lodgepoles using galvanized nails.

5. Steel Guy Anchor:

V.I.T. ‘Rapid Type Anchor’ with installation in accordance with manufacturer’s specifications and recommendations.

6. Guying Hardware:
(a) Wire: 1/8” galvanized, (b) Hose: 1/2" new rubber hose, (c) U-Bolt Cable clamps: galvanized, size as required, (e) Safety Sleeve: 1/2" white P.V.C. full length of wire.

G. Tree Paint: Morrison Tree Seal, Cabort Tree paint, or equal.

H. Water: Furnished by Owner; transport as required.

I. Mulch:

1. ‘Forest Floor 0-4”’ as supplied by Aguinaga Fertilizer, 949•786•9558 or equal.

2. The mulch shall consist of a woody bark material 2 inches or less in size.

F. Plant Material:

Plants shall be in accordance with the California State department of Agriculture’s regulation for nursery inspections, rules and rating. All plant materials shall have been inspected and released by the County Agricultural inspector prior to delivery on the job. All plants shall have a normal habit of growth and shall be sound, healthy, vigorous and free of insect infestations, plant diseases, sunscalds, fresh abrasions of the bark, excessive abrasions, or other objectionable disfigurements. Tree trunks shall be sturdy and have well “hardened” systems and vigorous and fibrous root systems which are not root or pot-bound.

In the event of disagreement as to condition of root system, the root conditions of the plants furnished by the Contractor in containers will be determined by removal of earth from the roots of not less than two plants or more than two percent of the total number of plants of each species or variety. Where container-grown plants are from several sources, the roots of not less than two plants of each species or

1. variety from each source will be inspected. In case the sample plants inspected are found to be defective, the Landscape Architect reserves the right to reject the entire lot or lots of plants represented by the defective samples. The Landscape Architect is the sole judge as to acceptability. Any plants rendered unsuitable for planting because of this inspection will be considered as samples and will be provided at the expense of the Contractor.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -7

2. The size of the plants will correspond with that normally expected for species and variety of commercially available nursery stock or as specified on drawings. The minimum acceptable size of all plants measured before pruning with the branches in normal position, shall conform with the measurements, if any, specified on the drawings in the list of plants to be furnished. Plants larger in size than specified may be used with the approval of the Landscape Architect, but the use of larger plants will make no change in Contract price. If the use of larger plants is approved, the ball of earth or spread of roots for each plant will be increased proportionately.

3. All plants not conforming to the requirements herein specified, shall be considered defective and such plants, whether in place or not, shall be marked as rejected and immediately removed from the site of the work and replaced with new plants at the Contractor’s expense. The plants shall be of the species, variety, size and conditions specified herein or as shown on the drawings. Under no conditions will there be any substitutions of plants or sizes listed on the accompanying plans, except with the express consent of the Landscape Architect.

4. Pruning:

At no time shall trees, (excluding palm trees) or plant materials be pruned, trimmed or topped prior to delivery and any alteration of their shape shall be conducted only with the approval and when in the presence of the Landscape Architect.

5. Plant Material:

Plant material shall be true to botanical and common name and variety as specified in the latest edition of the “Annotated Checklist of Woody Ornamental Plants in California, Oregon and Washington”, published by the University of California School of Agriculture.

4. Nursery Grown and Collected Stock:
a. Grown under climatic conditions similar to those in locality of project. b. Container-grown stock in vigorous, healthy condition, not root-bound or with root system hardened off.
c. Use only liner stock plant material which is well established in removable containers or formed homogenous soil section.

5. Substitute plant material will not be permitted unless specifically approved in writing by the Landscape Architect.

6. Sod:

Shall be Marathon II by Southland Sod Farms and shall be well established, disease-free, and weedfree sod in a healthy vigorous condition.

G. Guying and Staking Materials:

1. Wood tree stakes:

Lodge pole pine, full treated with Coppernapthanate Wood Preservative in strict accordance with Federal Spec. TT-W-572 Type 1 Composition B, 2" (mm. nominal size) diameter x 10' long, no split stakes. Stakes are to be free of loose knots or bends and are to be pointed at one end.

2. Pipe Tree Stakes:

Sch. 40 steel pipe, 1-1/2" diameter with cap, primed and painted before installation with two coats flat black exterior enamel. Touch up in field to match shop condition.

3. Ties:
a. V.I.T. Products ‘Twist brace’, 800•729•1314
TB-24 for 15 Gallon Trees
TB-36 for 24” Box Trees
TB-42 for 36” Box Trees
b. Attach to Lodgepoles using galvanized nails.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -8

4. Steel Guy Anchor:

V.I.T. ‘Rapid Type Anchor’ with installation in accordance with manufacturer’s specifications and recommendations.

5. Guying Hardware:
(a) Wire: 1/8” galvanized, (b) Hose: 1/2" new rubber hose, (c) U-Bolt Cable clamps: galvanized, size as required, (e) Safety Sleeve: 1/2" white P.V.C. full length of wire.

H. Tree Paint: Morrison Tree Seal, Cabort Tree paint, or equal.

I. Water: Furnished by Owner; transport as required.

J. Mulch:

4. ‘Forest Floor 0-4”’ as supplied by Aguinaga Fertilizer, 949•786•9558 or equal.

5. The mulch shall consist of a woody bark material 2 inches or less in size.

6. Compact grades adjacent to edging to avoid settling.

K. Tree transplant stimulant”

4. ‘Super-Thrive’ by Vitamin Institute

3. EXECUTION

3.01 SURFACE CONDTIONS AND PROTECTION OF PROPERTY
A. Prior to excavation for planting or placing of stakes, locate all electric cables and conduits, storm and sanitary sewer lines and all other utility lines so that proper precautions may be taken not to damage such improvements. In the event of a conflict between lines and plant locations, promptly notify the Landscape Architect. Failure to follow this procedure places upon the Contractor the responsibility to repair damages at his own expense which result from work hereunder.

3.02 INSPECTION
A. Obtain City certification that final grades to +0.10' have been established prior to commencing planting operations. Provide for inclusion of all amendments, settling, etc. Landscape Contractor shall be responsible for shaping all planting areas as indicated on plans or as directed by the Landscape Architect.

B. Inspect trees, shrubs and liner stock plant material for injury, insect infestation and trees and shrubs for improper pruning.

C. Do not begin planting of trees until deficiencies are corrected or plants replaced.

3.03 PREPARATION
A. Soil Preparation:

1. After rough grading operations have ceased and finished grades have been established to within .10’, the soil shall be conditioned and fertilized in the following manner. Amendments shall be uniformly spread and cultivated thoroughly by means of mechanical tiller into the top 4" of soil. The following organic, soil amendments and fertilizer rates, and quantities are to be used for bid basis only. Specific planting specifications will be made after rough grading operations are complete and soil samples are tested by the Owner per section 1.03F.

Application Rates (Per 1,000 square feet)
Refer to Drawings

3.04 PLANTING INSTALLATION
A. General:

1. Actual planting shall be performed during those periods when weather and soil conditions are suitable and in accordance with locally accepted practice, as approved by the Architect.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -9

2. Only as many plants as can be planted and watered on that same day shall be distributed in a planting area.

3. Containers shall be opened and plants shall be removed in such a manner that the ball of earth surrounding the roots is not broken and they shall be planted and watered as herein specified immediately after removal from the containers. Containers shall not be opened prior to placing the plants in the planting area.

4. Plant locations shown on the Drawings are tentative and subject to minor modification in the field as directed by the Landscape Architect. Make such modifications of location at no additional cost to the Owner.

B. Pre-Plant Weed Control:

1. If live perennial weeds exist on site at the beginning of work, spray with a non-selective systemic contact herbicide, as recommended and applied by an approved licensed landscape pest control advisor and applicator. Leave sprayed plants intact for at least fifteen (15) days to allow systemic kill.

2. Clear and remove these existing weeds by mowing or grubbing off all plant parts at least 1/4" below the surface of the soil over the entire area to be planted.

3. After irrigation system is operational apply water for five (5) to ten (10) days as needed, to achieve weed germination. Apply contact herbicides and wait as needed before planting. Repeat, if required by Architect.

4. Maintain site weed free until final acceptance by Owner utilizing mechanical and chemical treatment.

C. Lay-Out of Major Locations:

1. Locations for plants and outlines of areas to be planted shall be marked on the ground by the Contractor before any plant pits are dug. All such locations shall be approved by the Landscape Architect. If underground construction or utility line is encountered in the excavation of planter pits, other locations for planting may be selected by the Landscape Architect. Layout shall be accomplished with flagged grade stakes indicating plant names and specified container size on each stake. It shall be the contractor’s responsibility to confirm with the City Representative and governing agencies the location and depth of all underground utilities, and obstructions.

D. Planting of Trees and Shrubs:

1. Excavation for planting shall include the stripping and stacking of all acceptable topsoil encountered within the areas to be excavated for trenches, tree holes, plant pits and planting beds.

2. Excess soil generated from the planting holes and not used as backfill or in establishing the final grades shall be removed from the site.

3. Protect all areas from excessive compaction when trucking plants or other material to the planting site.

4. Center plant in pit or trench.

5. Face plants with fullest growth into prevailing wind.

6. Set plant plumb and hold rigidly in position until soil has been tamped firmly around ball or roots.

7. The planting pits for 24" box and larger Containers should be excavated twice the diameter and two feet deeper than the rootball with roughed-in sides. No prepared backfill mix shall be placed under rootball.

In addition, for trees not planted in tree grates, install a flexible 4" corrugated, perforated drain pipe with soil fabric sock surrounding base of plant pit. Provide a snap tee connection and riser extension to finish grade and install a snap end cap. As determined in field, if percolation rate is less than 2" / hr. additional 6" diameter auger holes at diagonal corners of plant pit shall be made to the depth of 4' below rootball and filled with 3/4" crushed rock and covered with filter fabric.

8. Container plants shall be backfi1led with a thoroughly mixed blend of the following:
amended site soil (refer to Drawings).

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -10

9. All plants which settle deeper than the surrounding grade shall be raised to the correct level. After the plant has been placed, additional backfill shall be added to the hole to cover approximately one-half of the height of the root ball. At this stage, water shall be added to the top of the partly filled hole to thoroughly saturate the root ball and adjacent soil.

10. Can Removal:
a. Cut cans on two sides with an acceptable can cutter. b. Do not injure root ball.
c. Do not cut cans with spade or ax.
d. After removing plant, superficially cut edge roots with knife on three sides.

11. Box Removal:
a. Remove bottom of plant boxes before planting.
b. Remove sides of box without damage to root ball after positioning plant and partially backfilling.

12. Plant Tablets:
a. After the water has completely drained, planting tablets shall be placed in the tree and shrub plant pits, no more than 1/3 the way up the rootball and spaced equally around the perimeter approximately 2” from root tips, as indicated below:

Refer to Drawings
b. Planting tablets shall be set with each plant on the top of the root ball while the plants are still in their containers so the required number of tablets to be used can be easily verified by the Landscape Architect.

13. Backfill:
a. The remainder of the hole shall then be backfilled and tamped firm. b. After backfilling, an earthen basin shall be constructed around each plant. Each basin shall be of a depth sufficient to hold at least two (2) inches of water. The basins shall be constructed of amended backfill materials. Remove basin in all turf areas after initial watering c. Make basin berms for trees and shrubs and from 5 gallon and larger containers at least 4" high.

Unless otherwise directed, make other mounds at least 2" high. d. On slopes, construct half-mounds on the lower side if full mounds are not practical. e. After watering, refill settlement within the basins to the required grade, using the specified mix. f. Watering basins shall be planted with ground cover in normal pattern.

14. Watering:

Immediately after planting, apply water to each tree, vine and shrub in a moderate hose stream in the planting basins, until the material about the roots is completely saturated from the bottom to the top:
a. Provide thorough watering of ground cover by means of the irrigation system within one hour after ground cover planting.
b. Apply water in such quantities, and at such intervals, as are required to keep the ground moist at all times well below the root system of grass and other planting. c. Provide hose watering for plants which cannot be efficiently watered with the irrigation system.

15. Pruning:
a. Pruning shall be limited to the minimum necessary to remove injured twigs and branches. Pruning may not be done prior to delivery of plants. Cuts over 3/4" in diameter shall be painted with tree paint.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -11

16. Staking and Guying:

Staking of all trees shall be completed immediately after planting and in accordance with the planting details. All stakes shall be installed plumb and as indicated in details. Guying of any or all of the transplanted Pine Trees shall be at the discretion of the Landscape Architect after on-site review of site and planting conditions.

E. Sod Planting:

1. Install sod within 24 hours after its delivery to the job site.

2. Preparing Soil:

Remove rocks, weeds, debris from area to be sodded. Work up soil to a depth of 6 inches, and break up all clods. Soil prep all areas as noted elsewhere in specifications and Section 3.03

3. Grading and Rolling:

Carefully smooth all surfaces to be sodded. Roll area to expose soil depressions or surface irregularities. Regrade as required.

4. Turn on irrigation system to moisten soil prior to laying

5. Fertilizing:

Spread Turf Fertilizer (12-0-0) onto the soil evenly at the rate of 5 pounds per 1000 square feet of lawn area. Rake in lightly. Be sure soil is level and smooth before laying sod. Do not lay sod on dry soil.

6. Laying Sod:

Lay first strip of sod slabs along a straight line (use a string in irregular areas). Butt joints tightly, do not overlap edges. On second strip, stagger joints much as in laying bricks. Use a sharp knife to cut sod to fit curves, edges, sprinkler heads.

7. Watering:

Do not lay whole lawn before watering. When a conveniently large area has been sodded, water lightly preventing drying. Continue to 1ay sod, and to water until installation is complete.

8. Rolling Sod:

After laying all sod, roll lightly eliminate irregularities and to form good contact between sod and soil.

Avoid a very heavy roller or excessive initial watering which may roller marks.

9. Irrigation:

Water thoroughly the completed lawn surface. Soil should be moistened at least 8 inches deep. Repeat sprinkling at regular intervals to keep sod moist at all times until rooted.

After sod is established, decrease frequency and increase amount of water per application as necessary.

10. Replacement:

Where sodded areas do not show a prompt and obvious indication of viability, re-sod as originally specified at ten day intervals until an acceptable stand of grass is established. Replace all dead or dying sod with equal material as directed by Landscape Architect.

F. Pot Planting:

1. Place all plants as specified and as located on plans.

2. Backfill pot to within 1” of rim with a thoroughly mixed custom blend of the following or an approved commercially mixed planter pot soil mix.
1 part by volume washed Silica sand
1 part by volume Organic Amendment (Section 2.01C)
10 lbs 12-8-8 fertilizer per cubic yard of custom mix or approved commercially mixed planter pot soil mix (if fertilizer is not already incorporated into the commercial mix).

G. Mulch Cover:

All groundcover, perennial, and annual beds to be dressed with 2” layer of mulch.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
LANDSCAPE PLANTING 32 90 00 -12

3.05 CLEAN-UP
A. After all planting operations have been completed, remove all trash, excess soil, empty plant containers and rubbish from the property. All scars, ruts or other marks in the ground caused by this work shall be repaired and the ground left in a neat and orderly condition throughout the site. Contractor shall pick up all trash resulting from this work no less frequently than each Friday before leaving the site, once a week, and/or the last working day of each week. All trash shall be removed completely from the site.

B. The Contractor shall leave the site area broom-clean and shall wash down all paved areas within the scope of work area, leaving the premises in a clean condition. All walks shall be left in a clean and safe condition.

3.06 OBSERVATION SCHEDULE
A. The Contractor shall be responsible for notifying the Landscape Architect in advance for the following site visits, according to the time

1. Pre-job conference - 7 days

2. Final grade review - 48 hours

3. Plant material review - 48 hours

4. Plant layout review - 48 hours

5. Soil preparation and planting operations. One tree with each type of specified staking shall be approved prior to planting of trees - 48 hours.

6. Pre-maintenance - 7 days

7. Final walk-through - 7 days
B. When observations are conducted by someone other than the Landscape Architect, the Contractor shall show evidence in writing of when and by whom these inspections were made.

C. No site visits shall commence without all items noted in previous Observation Reports are either completed or remedied, unless such compliance has been waived by the Owner. Failure to accomplish punch list tasks or prepare adequately for desired inspections shall make the Contractor responsible for reimbursing the Architect at his current billing rates per hour (plus transportation costs). No further inspections shall be scheduled until this fee has been paid and received.

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
DRAINAGE AND SEWER PIPING 33 34 00 -1
SECTION 334000

DRAINAGE AND SEWER PIPING

1. GENERAL

1.01 GENERAL CONDITIONS
A. The general conditions, supplementary conditions are hereby made a part of this section.

1.02 DESCRIPTION
A. Work Included:

Furnish all labor, materials, equipment, appliances and necessary incidentals for the complete installation of all Sewer and Drainage piping and devices as shown on the Drawings and / or as specified herein.

1. 6” PVC Sewer Line

2. Sewer Cleanout

3. 4” Sewer Line

4. 3” Channel Drain

5. 4” Drain Pipe

6. 6” Drain Pipe

7. 8” Drain pipe

8. 12” Drain Pipe

9. Pop-up Drain Emitter

10. Perforated Drain Pie System

11. 6” Sewer Lateral Per City of Fullerton Std. Plan 310 B. Related Work In Other Sections:

1. Irrigation [328800].

2. Landscape Planting [329000].

3. Tree and Plant Protection [015639]

1.03 SUBMITTALS
A. Comply with City Submittal Procedures
B. Product Data: Submit manufacturer's product data, including installation instructions.

C. Shop Drawings: Submit manufacturer's shop drawings, indicating materials, components, and dimensions.

D. Warranty: Submit manufacturer's standard warranty.

1.04 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

B. Storage: Store materials in clean, dry area in accordance with manufacturer's instructions.

C. Handling: Protect materials during handling and installation to prevent damage.

1.05 PRODUCTS
A. Manufacturers:

1. NDS, Inc., 851 North Harvard Avenue, PO Box 339, Lindsay, California 93247. Toll Free (800) 726- 1994. Toll Free Fax (800) 726-1998. Phone (559) 562-9888. Fax (559) 562-4488. Website www.ndspro.com.

2. ADS (Advanced Drainage Systems)

3. JM Eagle

4. Pacific Plastics

5. As approved by City
B. Polyvinyl Chloride Pipe

CITY OF GARDENA

ROWLEY PARK BASKETBALL REHABILITATION
DRAINAGE AND SEWER PIPING 33 34 00 -2

1. Pipe and fittings: polyvinyl chloride sewer pipe, four inch through fifteen-inch diameter, conforming to ASTM D3034, SDR 35 or ASTM F1760, SDR 35 with 25 percent minimum recycled post-industrial plastic.

2. Gasketed Joints: Elastomeric gasket joints conforming to ASTM D3212.

3. Gaskets: Chloroprene conforming to ASTM F477

EXECUTION

3.01 GENERAL
A. Inspection:

1. Examine areas to receive catch basins, piping, cleanouts. Notify Inspector if areas are not acceptable.

Do not begin installation until unacceptable conditions have been corrected.

B. Discrepancies:

1. In the event of discrepancy, the contractor shall immediately notify the City.

2. Do not proceed with the installation in these areas of discrepancy until all such discrepancies have been fully resolved.

3.02 INSTALLATION
A. Install catch basins, drain piping, sewer lines, cleanouts in accordance with manufacturer's instructions, Plans and City standards at locations indicated on the drawings.

END OF SECTION 33 40 00

APPENDIX

ROWLEY PARK IMPROVEMENTS BASKETBALL COURT REHAB
PHASE 1 – DEMOLITION, DRAINAGE, ELECTRICAL AND SITE FURNISHING JN 530

GEOTECHNICAL INVESTIGATION/

SOILS REPORT
ENGINEERS + GEOLOGISTS + ENVIRONMENTAL SCIENTISTS

BGB DESIGN GROUP
September 26, 2023
J.N. 23-161-PW

GEOTECHNICAL INVESTIGATION FOR

PROPOSED NEW LIGHT STANDARDS, BASKETBALL BACKBOARD POLES,

AND LIMITED PERCOLATION TESTING

ROWLEY PARK, CITY OF GARDENA, CALIFORNIA
ENGINEERS + GEOLOGISTS + ENVIRONMENTAL SCIENTISTS
Offices Strategically Positioned Throughout Southern California

ORANGE COUNTY OFFICE
3186 Airway Avenue, Suite K, Costa Mesa, California 92626 T: 714.549.8921 F: 714.751.0108
For more information visit us online at www.petra-inc.com September 26, 2023
J.N. 23-161-PW

BGB DESIGN GROUP
3185-C1 Airway Avenue
Costa Mesa, California 92626
Attention: Mr. Arthur Guy
Subject: Geotechnical Investigation for Proposed New Light Standards, Basketball Backboard Poles, and Limited Percolation Testing; Rowley Park, City of Gardena, California Dear Mr. Guy:

Petra Geosciences, Inc. (Petra) is submitting herewith our geotechnical investigation report for the proposed light standards, basketball posts and limited percolation tests for Rowley Park located to the southeast of the intersection at Van Ness Avenue and 132nd Street in the city of Gardena, California. Our services were performed in accordance with the scope of services outlined in our Subconsultant Agreement with BGB Design Group, dated March 30, 2023. This report presents the results of Petra’s field investigation and laboratory testing and provides grading and foundation design recommendations based on the current 2022 California Building Code (CBC) requirements.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding the contents of this report or require additional information, please contact us.

Respectfully submitted,
PETRA GEOSCIENCES, INC.

Evan Price
Senior Associate Geologist
BGB DESIGN GROUP September 26, 2023
Rowley Park / Gardena J.N. 23-161-PW

TABLE OF CONTENTS
Page
INTRODUCTION.........................................................................................................................................................1 SITE LOCATION AND DESCRIPTION.....................................................................................................................1 PROPOSED CONSTRUCTION AND GRADING ......................................................................................................1 Proposed Construction .......................................................................................................................................1 SITE RECONNAISSANCE AND SUBSURFACE EXPLORATION.........................................................................1 LABORATORY TESTING ..........................................................................................................................................2 Regional Geology...............................................................................................................................................2 Local Geology and Subsurface Soil Conditions.................................................................................................2 Groundwater.......................................................................................................................................................3 Seismic Hazard Zones........................................................................................................................................3 Seismically-Induced Flooding............................................................................................................................3 Percolation Testing and Results.........................................................................................................................3 Faulting ..............................................................................................................................................................5 Seismic Design Parameters................................................................................................................................5 Discussion - General ..........................................................................................................................................8 CONCLUSIONS AND RECOMMENDATIONS ........................................................................................................9 General Feasibility.................................................................................................................................................. 9 Plan Review ............................................................................................................................................................ 9 Site Drainage Considerations.................................................................................................................................. 9 FOUNDATION DESIGN CONSIDERATIONS ........................................................................................................10 Allowable Soil Bearing Capacities...................................................................................................................10 Estimated Footing Settlement ..........................................................................................................................11 Lateral Resistance ............................................................................................................................................11 Drilled Pier Foundations....................................................................................................................................... 11 SOIL CORROSIVITY SCREENING .........................................................................................................................11 General Corrosivity Screening .........................................................................................................................11 FUTURE IMPROVEMENTS AND/OR GRADING..................................................................................................12 REPORT LIMITATIONS ...........................................................................................................................................12

ATTACHMENTS

LITERATURE REVIEWED
FIGURE 1 – SITE LOCATION MAP
FIGURE 2 – BORING LOCATION MAP
APPENDIX A – EXPLORATION LOGS
APPENDIX B – LABORATORY TEST PROCEDURES / LABORATORY TEST DATA APPENDIX C – PERCOLATION TEST SUMMARY
APPENDIX D – SEISMIC DESIGN ANALYSIS

GEOTECHNICAL INVESTIGATION FOR

PROPOSED NEW LIGHT STANDARDS, BASKETBALL BACKBOARD POLES,

AND LIMITED PERCOLATION TESTING

ROWLEY PARK, CITY OF GARDENA, CALIFORNIA

INTRODUCTION
Petra Geosciences, Inc. (Petra) is submitting herewith the results of our geotechnical investigation for the proposed new light standards, basketball posts, concrete flatwork, and limited percolation testing. The purposes of this investigation were to determine the nature of surface and subsurface soils, to evaluate their in-place characteristics, and to provide geotechnical recommendations with respect to site clearing and grading, and for the design and construction of other improvements.

SITE LOCATION AND DESCRIPTION
The subject site consists of an approximate 2.5-acre section in the northwest corner of Rowley Park. The site currently consists of several concrete basketball courts, a concrete skatepark, children’s play equipment, several concrete walkways, grass landscaping, and several rows of trees. The site is bounded on the west by Van Ness Avenue, on the north by 132nd Street, and on the east and south by the larger portions of Rowley Park consisting of parking areas, athletic fields, and open landscape. Along the southern boundary of the subject site lies a community center as well as a sports gymnasium. A small steel shade structure lies adjacent to the gymnasium.

PROPOSED CONSTRUCTION AND GRADING
Proposed Construction
Although detailed site plans have not been provided at this time, based on preliminary project discussions, it is our understanding that the existing park will remain relatively intact with several site improvements.

The site improvements are likely to include new light structures, basketball backboard poles, and an improved drainage/infiltration system.

SITE RECONNAISSANCE AND SUBSURFACE EXPLORATION
Our firm performed a site reconnaissance and subsurface exploration on June 15, 2023. Our site reconnaissance consisted of the visual evaluation of the existing surface conditions. Existing surface conditions within the site that were observed during our site reconnaissance are described in the “Site Location and Description” section of this report.

Our subsurface exploration of the subject site consisted of the drilling of four hand-auger exploratory borings to depths ranging from approximately 7.5 to 11 feet below the existing ground surface. Soil materials encountered were visually classified and logged in general accordance with the Unified Soil BGB DESIGN GROUP September 26, 2023
Rowley Park / Gardena J.N. 23-161-PW