Table 2 Menu of Ordinance Options for PV Installation
Policy Type Pros Cons Rincon Recommendation
1. PV system that
establishes a minimum % of
rooftop space (50%) if an
array sized to offset 50% of
the building’s energy spend
is not feasible.
▪ PV, particularly large
arrays, end up being long-
term cost effective
▪ Greater savings when
combined with energy
efficiency
▪ Can produce greater GHG
reduction over building
life
▪ Can be a large
incremental cost
▪ Variable investment
requirements distributed
across different project
types/developers
▪ Physical constraints on
rooftop
Maximum Climate Benefit,
Adapted to Glendale’s urban
environment with
potentially variable rooftop
space. Note that this
recommendation blends
together two policy
approaches (% offset energy
spend and % rooftop
installation)
2. Small minimum PV size
requirement based off
building square footage
▪ Greater savings when
combined with energy
efficiency
▪ Small minimum system
size allows project sizing
flexibility
▪ Cost-effective under most
major project scenarios
▪ Requires external
documents and/or
calculations
▪ If install minimum only,
offsets small percentage
of total usage
Medium Climate Benefit;
High Feasibility (largest # of
adopters) Cost-Effective
3. PV system requiring
some percentage of offset
projected annual electricity
usage
▪ Greater savings when
combined with energy
efficiency
▪ Cost effective under most
major project scenarios
▪ Can produce more
ambitious GHG reduction
over the life of the
building
▪ Can be a considerable
incremental cost
▪ Variable investment
requirements
▪ Physical constraints on
rooftop
▪ Sizing may not be
feasible for different
project sizes
Not Recommended without
adaptation for urban rooftop
space (%) as does not
include considerations for
roof size, Less Feasible,
Climate-Ambitious
PV = photovoltaic
Recommended Ordinance Overview:
Require non-residential and multifamily PV systems to offset 50 percent of projected electricity use if roof space is sufficient; or cover at least 50 percent of rooftop space for buildings where a 50 percent offset of building electricity usage by a PV array is not possible.
Ordinance aspect: Require non-residential and multifamily PV systems to offset 50 percent of projected electricity use if roof space is sufficient, or cover at least 50 percent of rooftop space for buildings where a 50 percent offset of building electricity usage by a PV array is not possible. Exclude any specific exemptions.
Reasoning: This ordinance presents a hybrid-model between mandated percentages for roof size and energy spend, allowing for flexibility, while maximizing GHG reduction and local renewable energy production.
Ordinance aspect: Physical infeasibility waiver (e.g., shading, vegetation, other structures). Burden falls on project applicant to prove infeasibility.
156 of 199
City of Glendale
Building Codes Information & Recommendations
Reasoning: Adopting 50 percent of roof space for PV arrays allows for flexibility for projects that cannot offset 50 percent of their gross sf energy spend via rooftop PV alone, which is consistent with Glendale’s urban environment building stock and potentially limited roof size.
PV maximum and minimum size arrays are shown to be cost-effective when compared with a mixed-fuel scenario in both Glendale climate zones for both residential and non-residential buildings (Local Energy Codes Cost Effectiveness Explorer 2022)3. Separate cost effectiveness study for just PV may be requested through Local Codes and Standards Team.
Ordinance aspect: Infeasibility waiver.
Reasoning: An infeasibility waiver process places the burden on the project applicant or developer to show that a PV array offsetting 50 percent of electricity demand or taking up 50 percent of total roof space is impossible (e.g., shading, vegetation, topography). Rincon suggests a hybrid approach between City of Mountain View (percent requirement of roof space) and City of Oceanside (percent requirement of energy spend).
Case Study | 2019 City of Mountain View; PV System on
Major High-Rise Multifamily or Non-Residential Projects Pathway 1: Title 24 Subsection 101.10 Amendment
Ordinance Requirements
▪ Amends Chapters 8, 14, and 24 of the City Code as well as Title 24, also satisfies CEC cost- effectiveness requirements.
▪ High-rise multifamily new construction: install PV on 50 percent of roof area. ▪ Non-residential new construction: install PV on 50 percent of roof area.
Financing and Enforcement
▪ The return on PV installation and energy generation can be highly variable. However, there are federal tax credits available that can be leveraged to help limit the cost to developers and improve the return on the PV investment.
Exceptions
▪ A project may submit an exception by providing documentation that the required percentage of PV would produce more electricity than is required to operate the building annually (both high-rise residential and non-residential) (City of Mountain View 2019).
3 There is no PV-only scenario assessed under the Cost-Effectiveness Explorer Tool for residential buildings, so a dedicated solar PV study may need to be requested from the local codes and standards team. 157 of 199
City of Glendale
Building Codes Information & Recommendations
Case Study | 2019 City of Carlsbad; PV System on Major
High-Rise Multifamily or Non-Residential Projects; Large Minimum System Capacity
Pathway 1: Title 24, Subchapter 3 Amendment
Ordinance Requirements
▪ Amends Section 18.30.130 of municipal code, as well as Title 24 (submitted as part of a larger Title 24 modification package) part of Climate Action Plan ordinances adopted by the City. ▪ High-rise multifamily new construction: new constructions, or alterations of 2,000 sf: install 15 kW PV per 10,000 sf of new building; OR a minimum of 5kW for less than 10,000 sf. ▪ Non-residential new construction: same kW requirements based on square footage as above, OR the developer can, offset 80 percent of load based on TDV—a metric for code compliance that incorporates social and environmental impacts into the cost of energy. ▫ TDV energy use includes both conditioned and unconditioned space and must be calculated using a modeling software or other Building-Official-approved method.
Financing and Enforcement
▪ The return on PV installation and energy generation can be highly variable. However, there are federal tax credits available that can be leveraged to help limit the cost to developers and improve the return on the PV investment.
Exceptions
▪ Infeasibility waiver, which falls on the applicant to prove requirement infeasibility due to practical challenges. The Building Official can waive or reduce PV requirements post-exemption application by the applicant (City of Carlsbad 2019).
▪ Federal tax credit help improve cost-effectiveness.
Case Study | 2020 City of Oceanside; PV System on
Major High-Rise Multifamily or Non-Residential Projects; Large Minimum System Capacity
Pathway 2: Zoning Amendment, no Title 24 Modification
Ordinance Requirements
▪ Amends Article 60, Section 3047 (zoning ordinance); CEC approval is non-applicable and does not amend Title 24.
158 of 199
City of Glendale
Building Codes Information & Recommendations
▪ High-rise multifamily new construction (over 25 units): requires PV to supply 50 percent of estimated electricity demand.
▪ Additions (1,500 sf gross floor area): required to be solar-ready as defined by the California Energy Code.
▪ Non-residential (commercial development over 12,500 sf, industrial development over 25,000 sf, institutional development over 12,500 sf): requires PV to supply 50 percent of electricity demand.
Financing and Enforcement
▪ The return on PV installation and energy generation can be highly variable. However, there are federal tax credits available that can be leveraged to help limit the cost to developers and improve the return on the PV investment.
Exceptions
▪ If feasibility is deemed impossible by City staff, applicants can purchase a minimum of 75 percent renewable energy portfolio through their electric utility, if it is available (currently only available to residential customers) (City of Oceanside 2019).
EV Charging
EV Charging Overview
We understand that the City is also exploring options to increase EV adoption and improve access to EV chargers. Charging infrastructure for EVs is still in the early stages of development and is therefore, limited in availability. Besides the upfront cost of the EV itself, the largest barrier to entry for widespread EV adoption is accessibility to charging infrastructure. In March 2012, Governor Brown issued Executive Order (EO) B-16-12 directing the state government to accelerate the adoption of zero- emissions vehicles (ZEV) in California. This EO established a goal of 1.5 million (M) ZEVs by 2025. In January 2018, Governor Brown signed EO B-48-18, establishing a target for 250,000 Level 2 EV chargers and 10,000 Direct Current (DC) Fast Chargers4 to support the 1.5M ZEVs goal by 2025 and new goal of 5M ZEVs by 2030. New EV charging infrastructure will play an important role in supporting the growing EV fleet in California, as installing charging infrastructure in new buildings is significantly less expensive than retrofitting existing buildings.
EV charging infrastructure requirements are subject to CALGreen regulatory standards which are set forth in Title 24 of the California Code of Regulations. They are updated on a 3-year cycle, and the 2022 CALGreen requirements are set to be released in July 2022. The CALGreen standards include required standards for new developments, as well as two sets of voluntary standards, Tier 1, and Tier 2, that are more ambitious. In April 2022, the Bay Area Air Quality Management District (BAAQMD) released a report outlining design elements necessary for a project to be consistent with California’s long-term climate goals. BAAQMD is one of the only air quality management districts that has done analysis of the 2022 CALGreen mandatory EV charging infrastructure requirements. BAAQMD’s finds that while 2022
4 DC Fast Chargers are the most advanced form of EV charging units to date, ranked ahead of Level 1 and Level 2 charging units and requiring advanced infrastructure for construction and deployment. These chargers typically provide 125-1,000 miles of charge per hour and are the most expensive charging unit on the market to date.
159 of 199
City of Glendale
Building Codes Information & Recommendations
CALGreen EV charging infrastructure mandatory requirements ensure that charging infrastructure needs of 2025 are met, current mandatory requirements will not sufficiently meet long-term state climate goals. Therefore, the BAAQMD recommends adopting the more aggressive CALGreen Tier 2 voluntary standards to support charging needs after 2025 (BAAQMD 2022). Many California jurisdictions are adopting voluntary reach codes to increase EV charging requirements and help the state meet its long- term climate goals.
Policy Pathways for EV Infrastructure
The City could choose either a municipal code or a local amendment to Part 11 of the building code.
While Rincon has found that building code amendments are more common, several cities have used municipal codes for EV requirements. Since no cost-effectiveness study is required for EV charging reach codes, there is little difference between a municipal ordinance and a building code amendment. Rincon suggests using whichever pathway is chosen for the other ordinances/reach codes.
Benefits of Adopting at Least CALGreen Code Tier 2 Voluntary Standards Avoid Retrofit Costs
According to the California Air Resources Board (CARB), installing EV charging infrastructure in a new building can save an estimated $7,000 to $8,000 per parking space compared with retrofitting it later (CARB 2019).
Increase Equity
Providing access to more Level 2 chargers in workplace and public locations allows residents of multifamily households with ZEVs to charge more easily especially if they do not have access to parking at home (BAAQMD 2022).
Maximize GHG-Emission Reductions
Adopting the suggested code changes for a 10 percent EV-Capable requirement for EV charging infrastructure would lead to an estimated total 690,000 to 820,000 metric tons of carbon dioxide equivalent reduction over a 4-year time frame (CARB 2019).
EV Charging Units
To be able to develop an ordinance that will best support EV adoption, minimize cost impacts, and avoid inequities, it is necessary to understand the different EV charging options. There are three standardized levels of EV charging facilities that provide charge at different rates. These include Level 1, Level 2, and Level 3 chargers, which are summarized in Table 3 and further described below.
Table 3 EV Charging Levels
Type of Charger
Voltage Required
(Volts)
Charge per Hour
(Miles)
Estimated Time for
Full Charge (Hours) Typical Land Use Type
Level 1 120 3-6 8-12 Residential
160 of 199
City of Glendale
Building Codes Information & Recommendations
Level 2 208-240 14-35 3-4 Residential,
Commercial
Level 3, DC Fast
Chargers
200-600 80-600 0.5-0.75 Commercial (e.g.,
offices)
Sources: (Drive Clean 2021) (U.S. Department of Energy 2021) (Western Planner 2019) Level 1
Level 1 chargers are the most basic approach to EV charging and are considered slow charging, operating on a 15- to 20-amp breaker on a 120-volt AC circuit, which is standard for most household outlets. Level 1 chargers are typically the least expensive EV charger, ranging from $300 to 600 for the parts before labor, and $1,000 to $1,700 with cost of installation (Carvana 2021). This level of charger provides approximately 3 to 4 miles per hour of charge and typically takes 8 to 12 hours to reach full charge. As a result, Level 1 chargers are typically used and best suited for residential properties, such as single-family homes, condos, or multifamily units. However, as a result of many units and limited parking space in bigger, high-rise multifamily units, not every resident of this land use type may have access to overnight charging, raising equity concerns of EV charging accessibility.
Level 2
Level 2 chargers are the next step up from Level 1, operating on a 40- to 100-amp breaker on a 208- or 240-volt alternating current (AC) circuit, which is typical of the energy use exhibited by electric clothes driers. CARB staff estimate that the cost of non-residential new construction for a raceway and 40-amp, 208/240-volt panel capacity per space is between $870 to $960 (CARB 2019). Including installation, Level 2 chargers may see costs range between $2,000 to $5,000 for a non-networked charger and $4,500 to $9,000 for a networked charger (Carvana 2021). A networked charger implies enhanced connectivity to the grid and may include smart power management to share electrical capacity, avoiding expensive infrastructure upgrades and allowing the user to manage rates of charge. Additional cost variables may include an electrical panel or transformer upgrade or trenching distance from a similar panel. A non- networked charger may be more typical for a single-family home where electrical demand is more uniform and more easily managed. These chargers feature a unique electrical outlet for the car connection, providing 25 to 30 miles per hour of charge and taking 3 to 4 hours to fully charge an EV.
Due to their enhanced charging rate, Level 2 chargers are typically used by both residential and commercial service properties.
Level 3
To date, Level 3 chargers, also referred to as DC Fast Chargers, are the most advanced form of EV charging infrastructure. Operating on a 60- to 400-amp breaker on a 200- to 600-volt DC circuit with special grounding equipment, these chargers provide charge at a rate of 125 to 1,000 miles per hour with a full recharge typically taking 30 to 45 minutes. These chargers are characterized by industrial- grade car connection electrical outlets and are expensive to purchase and install as a result of the required utility infrastructure. Therefore, these chargers are used primarily for commercial charging stations, especially in office settings, and are not well suited for personal use at residential properties (Western Planner 2019). It is important to note that the rapid increase in EV charging infrastructure, in particular growth of Level 3 chargers, can have detrimental effects on the power grid. For instance, the high-charging loads associated with fast charging stations can result in increased peak demand, reduced 161 of 199
City of Glendale
Building Codes Information & Recommendations
reserve margins, voltage instability, and reliability problems. These effects need to be understood before developing ordinances requiring their installation (T&D World 2021).
EV Charging Infrastructure Definitions
EV charging infrastructure requirements are generally described in three terms of completeness, as seen below in Table 4.
Table 4 EV Charing Infrastructure
Type of Space Infrastructure Included
Infrastructure
Not Included Unique Attributes
Typical Land
Use Type
EV-Capable Parking stall, underground
conduit
Charger hardware,
wiring, charging plug,
charging station
Can be easily
converted to charging
space, avoids costly
future retrofits
Residential
EV-Ready Parking stall, underground
conduit, wiring, wire outlet
Charging plug,
charging station
Baseline “Plug and
Play” charging station
Residential,
Commercial
EV-Installed5 Parking stall, underground
conduit, wiring, wire outlet,
charging plug, charging
station
N/A Most advanced and
least prevalent space
available
Commercial, (e.g.,
offices and mixed-use
lots)
EV-Capable
EV-Capable is the most basic first step into the development of EV infrastructure. These spaces require the infrastructure for future installation of an EV charging station and do not require any charging equipment to be installed at the time of construction. This includes the underground conduit and parking stall but lacks any charger hardware, wiring, or plug to charge an EV. This charging space type requires some assembly prior to charging an EV. When the space is deemed ready to upgrade, any type of EV charging wire can be pulled through the already constructed conduit to connect to the charger. By accommodating for future development of EV charging spaces without committing to a specific number of charging spaces and technologies, EV-Capable spaces exhibit a low barrier to entry in the development of EV infrastructure, flexibility on the type of chargers, and an opportunity to increase the number, as necessary. Furthermore, integrating EV readiness into new construction avoids future retrofit costs of development. Per the City and County of San Francisco and a study conducted by Southwest Energy Efficiency Project, the cost to retrofit a charging station is nearly four times the cost of a new construction job, avoiding tens of thousands of dollars that would otherwise be spent at a later date (Southwest Energy Efficiency Project 2018, Peninsula Clean Energy 2019). Furthermore, not including wiring during construction helps reduce the chance that new technologies render the existing wiring obsolete. A downside to providing too many EV-Capable spaces that do not include pre-wiring is providing an inadequate supply of EV charging opportunities to a local community that exhibits an immediate need for EV charging. Despite the convenient opportunity to set some EV-Capable spaces aside for future development, it is paramount to fully evaluate the need of the local community first and foremost to strategically place EV-Capable spaces in areas where EV charging is not an immediate need.
5 EV-Installed charging spaces, the most advanced level of EV readiness, is also sometimes referred to as an Electric Vehicle Charging Station or Electric Vehicle Supply Equipment in electric vehicle infrastructure literature. 162 of 199
City of Glendale
Building Codes Information & Recommendations
As EVs proliferate through a given community and demand for charging increases, then local governance can return to these EV-Capable spaces and upgrade, as necessary.
EV-Ready
EV-Ready is the next step above EV-Capable and is also referred to as “Plug and Play.” These charging spaces require both the infrastructure and a wire outlet, the latter of which is not included in EV-Ready spaces. Although a charging unit is not required at this level, these spaces allow EV drivers to plug-in their own portable chargers into the outlet and begin charging. Given that a portable charging piece is required to charge the EV, these spaces are ideally suited for residential properties where the EV driver can easily store their portable charger at their residence. However, EV-Ready spaces are also in common use at commercial properties as well. While EV-Ready spaces increase the ease of which EV chargers are installed, there is a chance that new charging technology would require different wiring, making the existing infrastructure obsolete. However, as mentioned above, addressing the immediate needs of the local community is most important. Just as it is critical to be mindful of future updates to EV charging technology, it is equally important to address the immediate EV needs of a given community to ensure no one is left behind in the transition to California’s EV future. If a given community exhibits an immediate need for EV charging infrastructure, EV-Ready spaces offer a cost-effective means for EV drivers to satisfy their transportation needs. To accommodate equity concerns, it would be wise to consider a proper distribution of EV charging opportunities across one’s area of jurisdictional control rather than just providing EV charging access to the most affluent areas of a community.
EV-Installed
EV-Installed spaces, also referred to as EVSE and EV Charging Stations (EVCS), include everything an EV driver needs to charge their vehicle. Here, all the infrastructure necessary to charge an EV is available to the driver, including wiring, conduit, and the charging station itself. Currently, the cities of San Luis Obispo and Palo Alto require EV-Installed spaces in all new development (Charged Future 2021). This approach best enables rapid adoption of EVs, putting to rest all fears of not having a place to charge your vehicle. In just 1 year, the City of San Luis Obispo’s mandatory EV charging ordinance resulted in nearly 300 plugs as part of the approved developments, more than tripling its EV charging stations.
However, there is the potential that as EV technology develops these EV-Installed spaces will become outdated, requiring future investments and retrofits to keep up with EV innovations.
Land Use Type Recommendations
The City should consider developing EV reach codes that are specific to varying land use types.
1. New One-and Two-Family Homes and Townhomes with Attached Private Garages
2. New Multifamily, Hotels, and Motels
3. New Non-Residential
New One- and Two-Family Homes and Townhomes with Attached Private Garages
This land use type is characterized by new one- or two-family homes and townhomes with attached private garages, otherwise referred to as low-rise multifamily units. Due to slower rates of charging, 163 of 199
City of Glendale
Building Codes Information & Recommendations
Level 1 and Level 2 chargers are ideally suited for residential properties where drivers have privately accessible garages and can charge their EVs overnight. This is reflected in the adoption of a number of California city reach codes. The cities of Cupertino, Davis, East Palo Alto, Encinitas, and Hayward all require at least one Level 2 EV-Ready space per unit. Additionally, Cupertino, Carlsbad, and East Palo Alto require one Level 1 EV-Ready circuit to accompany the space. Mountain View requires both a Level 1 and Level 2 EV-Ready circuit per unit. As is demonstrated above, there exist several variations to the type of charger and charging space made available to residential properties. At the lower bound of this land use category, all municipalities with EV codes require at least one Level 1 EV-Ready space per unit while more progressive EV leaders require at least one Level 2 Charger per unit available. 2022 CALGreen Code requirements for one- and two-family homes/low-rise multifamily units, as well as 2022 CALGreen Tier 1 and Tier 2 voluntary standards for this category, are described below in Table 5.
Table 5 New One- or Two-Family Homes/Low-Rise Multifamily Requirements 2022 CALGreen Requirement Tier 1 Tier 2
One EV-Ready space per unit One Level 1 EV-Ready circuit per space One Level 2 EV-Ready space per unit and Level 1 circuitry
New Multifamily, Hotels, and Motels
This land use type is characterized by larger, high-rise dwelling units, such as typical multi-family units, hotels, and motels. EV reach codes for this category tend to vary based on the number of units available.
For example, in the cities of Cupertino and Hayward, multi-family units that comprise less than 20 units require one Level 2 EV-Ready space per unit. This is consistent with requirements for one- and two- family homes and townhomes with private garages. For complexes with more than 20 units, Cupertino requires 25 percent of spaces be Level 2 EV-Ready while Hayward requires 75 percent of spaces be Level 2 EV-Ready with the remaining spaces Level 2 EV-Capable. This difference in percentage requirements beyond the threshold of 20 units demonstrates how rapidly each city intends to enable adoption of EVs.
Hayward’s 75 percent Level 2 EV-Ready requirement for multifamily units is the second highest percentage requirement in this category in California to date besides the City of Mountain View, which requires all new spaces regardless of lot size be at least EV-Ready, requiring Level 2 charging at 15 percent of these spaces and 3 EV-Installed spaces for every additional 100 spaces added. Generally, we see that complexes that exceed a given unit threshold for multi-family units tend to see a reduction in EV space requirements. For example, a city may require multifamily lots with less than 20 spaces to have a Level 2 EV-Ready space per unit, while a building with more than 20 spaces may only require 20 percent of these spaces be Level 2 EV-Ready. Given that most families are not able to install EV chargers themselves, this lack of a 1:1 ratio for charging space per unit presents some concern regarding equity of accessibility to EV charging infrastructure. Whereas a single-family unit may always have access to an EV charger, a family in a multifamily complex may have to compete for charging spaces in their own living complex, perhaps leading to frequent off-site visits to public charging facilities. For these reasons, public charging facilities are critical to ensuring proper access to EV charging infrastructure.
On the other hand, there are many California cities that position their EV requirements for multifamily units without unit thresholds, the most progressive of which is the City of Encinitas, requiring 15 percent of all spaces be EV-Installed, followed by the City of Sacramento, which requires 20 percent of spaces be Level 2 EV-Ready. At the lower bound of EV readiness for high-rise multifamily units, hotels, and motels, California cities at this time typically reserve up to 20 percent of new spaces to be Level 2 EV-Ready, 164 of 199
City of Glendale
Building Codes Information & Recommendations
while more progressive cities like Hayward may include up to 75% of spaces be Level 2 EV-Ready. Others may require lower percentages of more advanced EV infrastructure, such as the City of Encinitas, which requires 15 percent Level 2 EV-Installed spaces.
2022 CALGreen requirements for new multifamily units, hotels, and motels, Tier 1 and Tier 2 requirements, and examples of requirements beyond Tier 2 are described in below in Table 6 (California Department of Housing and Community Development 2021).
Table 6 New Multifamily, Hotels, and Motels Requirements 2022 CALGreen
Requirement
Typical EV Code
Considerations
(Number of
Spaces) Tier 1 Tier 2 Beyond Tier 2
Municipal
Examples
Referenced
40% EV-Ready
25% of parking
spaces require
low power Level
2 receptacles
5% of parking
spaces in
buildings with 20
or more units
require high
power Level 2
chargers (EVSE)
<20 spaces 35% of parking
spaces to be EV
Ready
40% of parking
spaces to be EV
Ready
40-50% Level 2 EV-
Ready, plus 25-
30% EV-Capable
Cupertino,
Hayward, Davis,
Mountain View,
Palo Alto,
Sacramento,
Carlsbad
>20 spaces If a project has
>20 units, the
10% of total
parking spaces
to have Level 2
EVSE
If a project has >
20 units, then
15% of total
parking spaces to
have Level 2 EVSE
40-75% Level 2 EV-
Ready, plus 15-
33% Level 2 EV-
Installed
EVSE = electric vehicle supply equipment
New Non-Residential
Despite the fact that residential charging is much more heavily utilized, the expansion of public charging infrastructure is an important way the City can help develop the local EV market and provide for equitable access. The convenience of making EV charging infrastructure available is critical to establishing EV driver confidence in the local community. Public charging encourages EV drivers to use their full range, increases general awareness, and offers comfort to existing drivers and prospective buyers. Most up-to date analysis finds that even 2022 CALGreen Tier 2 voluntary non-residential requirements will not be sufficient to meet EV penetration past 2025. Therefore, several cities in California have adopted more ambitious requirement (BAAQMD 2022).
A 45-55 percent EV-readiness requirement for non-residential properties, in addition to at least 33 percent of these spaces be EV-Installed, would position the City as an EV leader, comfortably within range to achieve the climate objectives outlined by state-legislated goals. Other California cities have exceeded these measures to further support EVs in the local community. In fact, CARB acknowledges in their 2019/2020 Cost and Technical Analysis Report that non-residential public charging infrastructure is critical to lowering barriers to entry for prospective EV drivers. Many cities in California are developing EV codes for commercial properties and have developed specific codes for office parking and non-office parking. For example, the City of East Palo Alto requires 6 percent of non-office parking spaces be equipped with Level 2 EV-Installed and 5 percent with Level 1 EV-Ready for a total of 11 percent of spaces requiring some level of EV-readiness. Additionally, for office lots they have developed specific codes for developments with more than 10 spaces, 50 percent are equipped with some form of EV- 165 of 199
City of Glendale
Building Codes Information & Recommendations
readiness; 10 percent Level 2 EVCS, 10 percent Level 1 EV-Ready, and 30 percent Level 1 EV-Capable.
The City of Hayward also exhibits significant differences in EV-readiness when comparing office spaces to other non-residential spaces. Here, non-office lots with more than 10 spaces are required to be 15 percent Level 2 EV-Installed, while 50 percent of office spaces are equipped with some form of EV- readiness, 20 percent Level 2 EV-Installed and 30 percent Level 2 EV-Ready. 2022 CALGreen requirements for new non-residential requirements, as well as Tier 1 and Tier 2 requirements and examples of requirements that exceed CALGreen, are described in Table 7 (BSC 2021).
Table 7 New Non-Residential Requirements
2022 CALGreen
Requirement Tier 1 Tier 2 Beyond Tier 2
Municipal Examples
Referenced
Parking spaces >10
must install Level 2
EV capable
infrastructure in 15%
of spaces
Parking spaces >26
must install Level 2
EV chargers in 5% of
spaces
Adopt an additional 5%
Level 2 EV Charging
requirement and 5%
Level 2 EV Capable
space requirement with
10> spaces
Adopt an additional 10%
Level 2 EV Charging
requirement and 15%
Level 2 capable spaces
requirement for new
non-residential buildings
with 10 > spaces
45-55% EV-
readiness and 33-
50% of these spaces
at Level 2 EV-
Installed
Palo Alto, Hayward,
Mountain View,
Carlsbad, Cupertino,
East Palo Alto and
Encinitas
EV = electric vehicle
Code Considerations
It is well documented that limited access to EV charging infrastructure can limit EV adoption and slow progress on GHG reduction. While it may be tempting to require EV infrastructure in some form at every parking location, it is important other impacts such as grid capacity and future technology changes to maximize efficiency while incentivizing EV adoption.
Grid Considerations
As EV’s and charging technologies advance, charging times are decreasing. Faster charging times mean more electricity is entering the cars battery in a shorter time, meaning more strain on the grid and potentially the need for new grid infrastructure when high levels of charging are occurring at the same time. Furthermore, having more EVs and faster chargers means more vehicles can cycle through fewer charging stations and exhibit more strain on the electrical grid. New demands placed on existing electrical infrastructure should be carefully reviewed and incorporated into community planning efforts.
In addition, as a result of these new demands placed on the grid, additional considerations should be made to increase electrical infrastructure in certain parts of the City, where applicable.
Access Considerations
Because EV charging stations are a service, they are covered by the Americans with Disabilities Act (ADA). As a result, ADA-accessible EV charging stations must be provided, and this segment of the population must be accounted for. This reduces the total number of parking spaces that can be provided. The number of accessible charging spaces per standard EV charger is included below in Table 8 (City of Palo Alto 2016).
166 of 199
City of Glendale
Building Codes Information & Recommendations
Table 8 EV Charging Stations for Public and Common Use
Total Number of
EV Charging
Stations at a
Facility
Minimum Number (by Type) of EV Charging Stations Required to Comply with Section 11B-228.3.2.1 Van Accessible Standard Accessible Ambulatory
1 to 4 1* 0 0
5 to 25 1 1* 0
26 to 50 1 1 1*
51 to 75 1 2 2*
65 to 100 1 3 3*
101 and over 1, plus 1 for each 300, or
fraction thereof, over 100
3, plus 1 for each 60, or
fraction thereof, over 100
3, plus 1 for each 50, or fraction
thereof, over 100
EV = electric vehicle
Notes: Where an EV charger can simultaneously charge more than one vehicle, the number of EV charging stations provided shall be considered equivalent to the number of EVs that can be simultaneously charged. * Accessible EV charging station designed for accessibility but not reserved for exclusive use by the disabled.
Technological Considerations
Another consideration when determining what percentage of parking spaces should be EV-Capable, EV- Ready, or EV-Installed is how fast technologies are changing. Faster EV chargers and new charging technologies are being developed at a rapid pace. For example, Level 1 chargers which take many hours to charge have been replaced in large part with Level 2 and even Level 3 chargers which can charge up to 80 percent in an hour or less. Wiring every parking space to support cutting edge chargers today, may be obsolete by the time every charger is fully installed. Therefore, limiting the amount of installed infrastructure by requiring higher levels of EV-Capable and lower levels of EV-Installed/EV-Ready may help limit the amount of stranded assets in the future while keeping retrofit costs low.
Case Study | City of Hayward Low-Rise Multifamily, High- Rise Multifamily, and Non-Residential EV Charging
Infrastructure Requirements (2019)
Pathway 1: Title 24 Amendment
Ordinance Requirements
▪ Amendment of Part 11 of Title 24, Section 4 (Residential Mandatory Measures) and Section 5 (Non- Residential Mandatory Measures) minor exceptions
▪ Low-rise multifamily new construction
▫ Less than 20 spaces: 1 Level 2 EV-Ready space per unit. ▫ More than 20 spaces 75 percent of spaces Level 2 EV-Ready; remaining units Level 2 EV-Capable. ▪ High-rise multi-family new construction
▫ More than 10 spaces 15 percent must be equipped with Level 2 EVCS. 167 of 199
City of Glendale
Building Codes Information & Recommendations
▪ Non-residential new construction
▫ More than 10 spaces 20 percent must be equipped with Level 2 EVCS and 30 percent must be Level 2 EV-Capable.
Funding and Enforcement
▪ While including EV charging in new construction does increase costs, they are small compared to the cost for a retrofit. The City of Hayward found that installing two EV-Capable spaces during construction would cost $840 while retrofit costs would be $4,800. ▪ Enforcement of the ordinance to occur during building inspection.
Exceptions
▪ Where there is no commercial power supply.
▪ ADU and Junior Accessory Dwelling Units (JADU) without additional parking facilities, unless the electrical panel is upgraded, or a new panel is installed in which case only the electrical capacity requirements apply.
▪ Spaces accessible only by automated mechanical car parking systems are excepted from providing EV charging infrastructure (City of Hayward).
Case Study |City of Santa Monica Low-Rise Multifamily,
High-Rise Multifamily, Hotels/Motels, and Non-Residential EV Charging Infrastructure Requirements (2019)
Pathway 1: Title 24 Amendment
Ordinance Requirements
▪ Amendment of Part 11 of Title 24, Section 4 (Residential Mandatory Measures) and Section 5 (Non- Residential Mandatory Measures) minor exemptions
▪ Low-rise multifamily new construction: EVSE charging required at 10 percent of spaces and EV- Capable at 20 percent
▪ Hotels/motels new construction: EVSE charging required at 10 percent of spaces ▪ High-rise multifamily new construction
▪ Non-residential new construction
Funding and Enforcement
▪ While including EV charging in new construction does increase costs, they are small compared to the cost for a retrofit. The City of Hayward found that installing two EV-Capable spaces during construction would cost $840 while retrofit costs would be $4,800. ▪ Enforcement of the ordinance would occur during building inspection. 168 of 199
City of Glendale
Building Codes Information & Recommendations
Exceptions
On a case-by-case basis, where the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions:
▪ Where there is no commercial power supply
▪ Where there is evidence substantiating that meeting the requirements will alter the local utility infrastructure design requirements on the utility side of the meter so as to increase the utility side cost by more than $400 per dwelling unit
▪ ADU and JADU without additional parking facilities (City of Santa Monica 2019) Recommended Ordinance Overview
Most EV drivers rely on home charging, followed by workplace and public charging (Searle and Lutsey 2016). As such, the City’s EV codes should reflect these priorities. Based on the EV code data analysis the following trends appear to highlight the inclusion of the following:
▪ At least one Level 2 EV-Ready space per unit for one- and two-family homes/low-rise multifamily units with consideration for an additional Level 1 EV ready space per unit. ▪ At least 40-50 percent Level 2 EV-Capable spaces for larger high-rise multifamily complexes, hotels, and motels with consideration for between 15 percent and 33 percent of total spaces to be Level 2 EV-Installed spaces.
▪ 40-75 percent EV-Capable for non-residential properties with 33-50 percent of these spaces requiring Level 2 EV-Installed spaces.
On a case-by-case basis, allow for lower EV requirements when the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions:
▪ Where there is no commercial power supply
▪ Where there is evidence substantiating that meeting the requirements will alter the local utility infrastructure design requirements on the utility side of the meter so as to increase the utility side cost by more than $400 per dwelling unit
▪ ADU and JADU without additional parking facilities
Existing Building Substantial Retrofit Options
The City is also interested in understanding the opportunities around extending reach codes to requirements retrofits. While new construction represents the most straightforward and cost-effective way to ensure buildings being developed today will support the City’s long-term climate goals, the City of Glendale is mostly built out, and a significant portion of emissions come from existing building stock.
Therefore, extending PV, energy efficiency, EV, and electrificaiton requirements to retrofits represents an opportunity for the City to further their climate goals. Furthermore, targeting existing buildings already undergoing significant renovations is the most cost-effective time for this work, allowing easy access to building systems, as well as access to financing which can significantly increase cost effectiveness of projects. Summarized below are the EV, PV, and electrification ordinances which have been adopted in California. In addition, Rincon has included an approach which utilizes a scorecard 169 of 199
City of Glendale
Building Codes Information & Recommendations
which has been adopted by cities like Piedmont and Carlsbad to provide a performance-based approach for existing building retrofits.
Retrofit Thresholds
Many reach codes use the term “substantial” remodel or retrofit as a threshold for when a reach code would take effect. A substantial retrofit could be defined in several ways including percentage value of the work compared to the building market value, percent of floor area addressed or length of time.
Based on research by California Local Codes and Standards on 28 cities in California, 21 of them listed projects that affected over 50 percent of floor area as substantial.
The City of Carlsbad which has several major retrofit requirements defines a major retrofit as such, “Alterations and additions to existing residential structures and construction sites where: (A) for one and two family dwellings and townhouses with attached private garages, alterations have a building permit valuation equal to or greater than $60,000 or include an electrical service panel upgrade; or (B) for multifamily dwellings (three dwelling units or more), alterations have a building permit valuation equal to or greater than $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed”.
Other retrofits (such as the scorecard listed above) use a lower dollar amount to target medium sized retrofits as well. Ranges for these requirements appear to be between $25,000 and $60,000.
Ordinance Pathways
The ordinances for existing buildings are predominantly extensions of the new construction requirements that also cover “substantial remodels” as defined above. Therefore, the existing building ordinance pathway would coincide with whichever pathway is chosen for the new construction ordinance. The one exception for this is the performance pathway described below which is specifically developed to be a local building code amendment to Part 6. This approach has already been shown to be cost-effective by the Local Codes and Standards team.
Building Electrification
As of writing this memo, no cities that specifically require electrification at time of retrofit could be identified. However, Rincon has spoken with several cities (including those in Sacramento, Oakland, and San Mateo counties) that are looking at enacting these policies. An ordinance of this type could be triggered by a substantial retrofit or when a retrofit triggers Title 24 requirements (such as when external walls are modified). While this type or ordinance would be an important tool in progressing existing building electrification in Glendale, this would be a first-of-its-kind ordinance, which carries some level of risk to the City. Additional discussions with the Codes and Standards team could be helpful in this area.
EVs
The City of Carlsbad adopted an EV charging requirement for major renovations (see definition above) that requires major renovations to comply with the new construction requirements of their EV ordinance for any new parking that is built as part of the project. The City of Glendale could also extend their EV charging ordinance to cover all additional spaces added due to renovations of existing buildings. 170 of 199
City of Glendale
Building Codes Information & Recommendations
Solar PV
Several cities including, Carlsbad, Piedmont, and Santa Monica, require solar PV installation for major additions. Santa Monica defines a major addition as “The addition to any building of either: (1) an additional story; or (2) additional floor area equal to or greater than 50 percent of the building’s existing floor area prior to the addition.” Piedmont requires solar if adding an additional level or increasing the roof area by more than 30 percent. Carlsbad triggers their ordinance for non-residential retrofits that exceed $1,000,000 and affect more than 75 percent of existing floor area or an addition that increases the roof area by more than 2,000 sf. Both ordinances utilize a local amendment to Title 24. The solar requirement types are included in Table 9.
171 of 199
City of Glendale
Building Codes Information & Recommendations
Table 9 Options for Solar Requirements on Additions/Retrofits Watts GFA Annual Energy Use
1.5 – 2 watts per sf <10,000 sf – 5kW
>10,000 sf – 15kw*(GFA/10,000)
Annual TDV Energy Use * 0.8
kW = Kilowatt
GFA = gross floor area
sf = square feet
TDV = Time dependent valuation. TDV is a calculation that takes into account the societal cost/benefit of energy based on the climate zone, time of use, and environmental factors.
Existing Building Retrofit Performance Pathway
In addition to the prescriptive approaches for Building Electrification, EVs, and PV listed above, cities have begun adopting performance requirements for existing building retrofits. Due to the many variables associated with existing buildings, it can be difficult to identify specific actions that are cost effective and impactful in all scenarios. A performance pathway solves this issue by providing multiple options that each project can review and choose those approaches that suit their project best. The Local Energy Codes team has recently developed a tool for jurisdictions to create their own performance pathway which establishes a target score and a menu of individual measures with points weighted by site energy savings.
As structured, the ordinance amends the California Energy Code, and the intent is that an ordinance adopted in 2021 or 2022 would require only minor updates to remain effective in the 2022 code cycle, through 2025.
As proposed below, such an ordinance could be structured to amend Title 24, Article 6, Section 150.0 to require compliance as part of a defined project scope. The intent is to target medium-sized projects that are not otherwise subject to more comprehensive requirements under the State Energy Code. The amendment includes a table with the targets and points available for each measure and home vintage. It also includes specifications for each measure and exceptions. Compliance could be supported by an addendum to the Certificate of Compliance and building inspector verification. The ordinance could also include mandatory electric-readiness measures. Table 10 shows potential target scores for buildings by vintage year.
Table 10 Example Target Score by Vintage for City of Glendale Single Family - Climate Zone 12
Building Vintage
Pre-1979 1979-199 1993-2011
Target Score 13 11 8
172 of 199
City of Glendale
Building Codes Information & Recommendations
Table 11 Measures Developed for Glendale Single-Family Renovations via Cost Effectiveness Explorer
Single Family - Climate Zone 9 Measures
Building Vintage
Pre-1979 1979-1992 1993-2011
Air Sealing 1 -- --
Cool Roof 1 1 --
Duct Sealing 3 2 --
Heat Pump Clothes Dryer 1 1 1
High Eff HPWH 12 12 12
High Eff HVAC Heat Pump 7 5 4
HPWH 12 12 12
HVAC Heat Pump 5 4 3
Induction Cooktop 1 1 1
LED + Exterior Photosensor Mandatory Mandatory Mandatory New Ducts + Duct Sealing 6 4 1
PV 14 14 14
PV + Battery 13 13 13
PV + Electric Ready Pre-Wire 14 14 14
PV (points per KW) 6 6 6
R-13 Wall Insulation 3 -- --
R-49 Attic Insulation 5 2 1
Water Heating Package 1 1 1
Windows 4 3 --
Inductive Cooktop 2 2 2
Eff - Efficient
HPWH – Heat pump water heater
HVAC –Heating, ventilation, and air conditioning
LED- Light emitting diode
PV – Solar photovoltaic
KW- Kilowatt
Case Study |City of Piedmont (2019)
Pathway: Title 24 Amendment
Ordinance Requirements
▪ Amendment of Part 6 of Title 24
▪ A renovation project that costs $25,000 or more must include an energy efficient insulation or heating system electrification improvement to include in the renovation. 173 of 199
City of Glendale
Building Codes Information & Recommendations
▪ A renovation project that costs $100,000 or more must include two energy efficient insulation or heating system electrification improvements to include in the renovation. ▫ The energy efficient insulation or heating system requirement can be modified with a Home Energy Score of at least a 7 completed in the last five years. This modification is included so homes that have been pursuing energy efficiency measures can be recognized for their efforts.
Funding and Enforcement
▪ Several incentives exist from the utility and regional energy efficiency groups, such as BAYREN. ▪ Enforcement of the ordinance would occur during building inspection.
Exceptions
▪ A Home Energy Score Report for the low-rise building, completed within 5 years, demonstrating that the building already has a minimum Home Energy Score of 7 is submitted to the Building Official. ▪ In accordance with Section R104.10 Modifications, the Building Official shall not require the installation of R 106.6 Energy Efficient Measures E and/or F if one or more of the following conditions apply:
▫ The unique features of the construction of the low-rise residential structure, including, but not limited to, existing heating and/or cooling system(s) that are not configured for conversion to forced air systems preclude installation of those measures. ▫ The installation of the measures is not commensurate with the project’s scope and budget, as determined by the Building Official, because the cost of those measures would exceed 20 percent of the total project cost or require substantial construction in areas of the residential structure that would otherwise not be part of the project. 174 of 199
City of Glendale
Building Codes Information & Recommendations
Memo References
Bay Area Air Quality Management District (BAAQMD). 2022. CEQA Thresholds for Evaluating the Significance of Climate Impacts from Land Use Projects and Plans. https://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqa-thresholds- 2022/justification-report-pdf.pdf?la=en
California Air Resources Board (CARB). 2019. EV Charing Infrastructure: Non-residential Building Standards. https://ww2.arb.ca.gov/sites/default/files/2020- 09/CARB_Technical_Analysis_EV_Charging_Nonresidential_CALGreen_2019_2020_Intervening_ Code.pdf
______.2022. https://ww2.arb.ca.gov/zev-collaboration
California Building Standards Commission. 2019. Guide for Local Amendments of Building Standards, 2019 3rd Edition. (Accessed June 2022).
______. 2021. CARB Submission for EV Charging Infrastructure Provisions for Nonresidential Buildings in the Green Building Standards (CALGreen) Code. https://www.dgs.ca.gov/BSC/Rulemaking/2021- Triennial-Code-Adoption-Cycle/2021-code-advisory-committee-review California Energy Commission (CEC). 2022. Local Ordinances Exceeding the 2019 Code. “Local Reach Codes https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency- standards/2019-building-energy-efficiency-3
______. 2022. “2025 Building Energy Efficiency Standards”. https://www.energy.ca.gov/programs-and- topics/programs/building-energy-efficiency-standards/2025-building-energy-efficiency. (Accessed June 2022).
______. 2022. “2022 Building Energy Efficiency Standards Summary”. https://www.energy.ca.gov/sites/default/files/2021-
08/CEC_2022_EnergyCodeUpdateSummary_ADA.pdf. (Accessed June 2022) California Energy Codes & Standards. 2019. 2019 Cost-Effectiveness Study: Low-Rise Residential New Construction. August 01, 2019.
California Department of Housing and Community Development. 2021. Proposed Buildings Standards Regarding the 2022 California Green Building Standards Code, California Code of Regulations, Title 24, Part 11. https://www.hcd.ca.gov/docs/building-standards/2022-calgreen-fet.docx Carvana. 2021. How much does it cost to install an EV charger. https://blog.carvana.com/2021/07/how- much-does-it-cost-to-install-an-ev-charger/
Charged Future. 2021. EV Capable, EV-Ready, EV-Installed. https://www.chargedfuture.com/ev-capable- ev-ready-and-%20EV-installed/
City of Berkeley. 2019. City of Berkeley All-Electric Ordinance Staff Report. (Accessed June 2022).
City of Hayward. 2019. EV Ordinance. https://localenergycodes.com/?seo_name=map&lid=348 City of Santa Monica. 2019. EV Ordinance. https://localenergycodes.com/?seo_name=map&lid=288 175 of 199
City of Glendale
Building Codes Information & Recommendations
City of Palo Alto. 2016. New Regulations for Electric Vehicle Charging Stations. https://www.cityofpaloalto.org/files/assets/public/development-services/building- division/accessibility-files/evcs-palo-alto-presentation-final-rev.-11.18.16.pdf City of Hayward. 2020. “Reach Code Initiative.” https://www.hayward-ca.gov/reach-code. https://www.hayward-ca.gov/reach-code. (Accessed June 2022).
City of Oceanside. 2019. “Staff Report”.
https://localenergycodes.com/download/863/local_government_adoption_staff_report/fieldLis t/Oceanside%202019%20-%20Staff%20Report%20Zoning%20Ammendment%20ZA20-00002.pdf City of Mountain View. 2019. PV System on Major High-rise Multifamily or Non-Residential Projects. https://library.municode.com/ca/mountain_view/codes/code_of_ordinances?nodeId=PTIITHCO _CH8BU_ARTIBUCO_DIVIIIGRBUCO_S8.20.1CAGRBUSTCODO. (Accessed, 2022).
City of Carlsbad. 2019. Photovoltaic (PV) System on major high-rise multifamily or nonresidential projects.
https://localenergycodes.com/download/462/local_government_adoption_ordinance/fieldList/ Carlsbad%20-%20Ordinance%20CS-347.PDF; (Accessed June 2022).
Cohen, Armond et al. 2021. “Clean Power is the Key to California’s Clean Energy Future.” Issues in Science and Technology. https://issues.org/california-decarbonizing-power-wind-solar-nuclear- gas/
Delforge, Pierre, Stamas, Maria. 2019. “San Jose’s Proposed Building “Reach Code,” Explained. Sept 4, 2019. NRDC. https://www.nrdc.org/experts/pierre-delforge/san-joses-proposed-building-reach- code-
explained#:~:text=A%20reach%20code%20is%20a,creating%20roadmaps%20for%20other%20lo cal. (Accessed June 2022).
Drive Clean. 2021. Electric Charging is Easy. https://driveclean.ca.gov/electric-car-charging Earls, Maya. City of Berkeley to Defend New Natural Gas Ban in Ninth Circuit. May 11, 2022. Bloomberg Law. https://news.bloomberglaw.com/litigation/city-of-berkeley-to-defend-new-natural-gas- ban-in-ninth-circuit. (Accessed June 2022)
Energy Ace Resources. 2022. “What’s New in 2022”. https://energycodeace.com/resources Engelman, Eric. 2022. “Considering a New Construction Reach Code for your City or County in California?”. Cost Effectiveness Explorer. https://intercom.help/explorer-local-energy- codes/en/articles/5789919-considering-a-new-construction-reach-code-for-your-city-or-county- in-california. (Accessed June 2022).
Gridworks. “California’s Gas System in Transition.” 2020. https://gridworks.org/initiatives/cagas-system- transition/; (Accessed June 2022)
Local Energy Codes. 2022. “City of Glendale Summary”.
https://explorer.localenergycodes.com/jurisdiction/glendale-city/summary Local Energy Codes Cost Effectiveness Explorer. 2022. “Building Estimates for City of Glendale”. https://explorer.localenergycodes.com/jurisdiction/glendale-city/building- estimates?only_building_type=residental-buildings. (Accessed June 2022) 176 of 199
City of Glendale
Building Codes Information & Recommendations
Local Energy Codes. 2019. City of Ojai Ordinance.
https://localenergycodes.com/?seo_name=map&lid=664. (Accessed June 2022).
Peninsula Clean Energy. 2019. Building Electrification & Electric Vehicle Reach Codes. https://bayareareachcodes.org/wp-
content/uploads/2019/04/DraftModelReachCodes_STV2_24Apr19.pdf Searle, Stephanie and Lutsey, Nicholas. 2016. Leading edge of electric vehicle market development in the United States an analysis of California cities.
https://www.researchgate.net/profile/Nicholas-
Lutsey/publication/308155468_Leading_edge_of_electric_vehicle_market_development_in_the _United_States_An_analysis_of_California_cities/links/57db795108ae72d72ea38736/Leading- edge-of-electric-vehicle-market-development-in-the-United-States-An-analysis-of-California- cities.pdf
Sacramento City Council. 2019. An Ordinance Adding to and Amending Various Provisions of Title 15 of the Sacramento City Code and Adopting Local Amendments to the California Building Standards Code, Relating to Green Building Standards Including Electrification. https://localenergycodes.com/download/813/local_government_adoption_ordinance/fieldList/ Sacramento%202019%20-%20Ordinance.pdf; (Accessed June 2022).
Southwest Energy Efficiency Project. 2018. https://www.swenergy.org/cracking-the-code-on-ev-ready- building-codes
Teale, Chris. 2021. “Challenge to Berkeley gas regulation dismissed, a win for cities in carbon emissions fight”. Smart Cities Dive. https://www.smartcitiesdive.com/news/challenge-to-berkeley-gas- regulation-dismissed-a-win-for-cities-in-carbon/603415/ T&D World. 2021. How Will the Grid Adjust to EV Charging? https://www.tdworld.com/electrification/article/21168252/how-will-the-grid-adjust-to-ev- charging
U.S. Department of Energy. 2021. Developing Infrastructure to Charge Electric Vehicles. https://afdc.energy.gov/fuels/electricity_infrastructure.html Western Planer. 2019. Planning for Electric Vehicle Charging Facilities. https://www.westernplanner.org/2019articles/2019/4/10/planning-for-electric-vehicle- charging-facilities
177 of 199
Attachment A
2019 Building Reach Code Summary
178 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
Alameda PV 6/1/2021 8/11/2021 N/A
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
2019 LR Res NC /
2019 Non Res NC Section 140.0 Ord. No.
EE 12/21/2020 5/12/2021
New: SF mixed-fuel ≥ 10 EDR
margin / SF all-electric ≥ 4.7
efficiency EDR margin / MF
mixed fuel ≥ 10.3 EDR margin /
MF all-electric ≥ 0 EDR
Add/Alts: prescriptive
measures
New: MF mixed fuel ≥ 10.3
EDR margin / MF all-electric ≥
0 EDR
Add/Alts: prescriptive
measures
New: mixed fuel office ≥ 20%
compliance margin / all-
electric office ≥ 10%
compliance margin / mixed
fuel retail ≥ 16% compliance
margin / all-electric retail ≥
16% compliance margin
Add/Alts: prescriptive
measures
PV 12/21/2020 5/12/2021 N/A
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
EE 12/3/2019 2/20/2020
New: All-electric OR
Mixed Fuel, Total EDR margin >
10 AND electric-ready
New HRR/Hotel: All-electric
OR Mixed-Fuel and >10%
compliance margin
New: All-electric OR
Mixed-Fuel: 10% compliance
margin AND electric-ready
Exception: Labs, industrial,
manufacturing occupancies
19.36.040
PV 12/3/2019 2/20/2020 N/A
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
19.36.100.3
Brisbane PV 12/12/2019 2/20/2020 N/A
(see All-electric sheet)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for
> 10,000 sq. ft OR
Solar thermal
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for
> 10,000 sq. ft OR
Solar thermal
2019 LR Res NC /
2019 Non Res NC 15.81.050 Ord. No. 643
Albany 2019 LR Res NC /
2019 Non Res NC 12-6.1.b.4 (p) Resolution No.
2020-127
2019 Code Cycle - Locally Adopted Energy Ordinances
Berkeley Ord. No 7,678-N.S.2019 LR Res NC /
2019 Non Res NC
2022-5-25
1 179 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
Burlingame PV 8/17/2020 10/14/2020 N/A
(see All-electric sheet)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
2019 LR Res NC /
2019 Non Res NC 110.0 Ordinances 1979 ,
1980, 1981
EE 3/12/2019 8/14/2019
New: HPWH OR solar thermal
Adds/Alts: > $60k: Presc.
measures
New: HPWH OR increased
solar fraction
New: Electric water heating
OR solar thermal > 0.4 SF
Carlsbad Energy
Conservation
Ordinance CE Study
18.30.190 Ord. No. CS-348
PV 3/12/2019 8/14/2019 N/A New/Alt: 15 kW per 10,000
s.f.; min 5kW for < 10,000 s.f.
New/Alt: PV that offsets 80%;
15 kW per 10,000 s.f.; min
5kW for < 10,000 s.f.
2016 NR New
Construction 18.30.130 Ord. No. CS-347
Chula Vista EE 12/1/2020 1/25/2021
Add/Alts:
performance/precsriptive
efficiency reqs. for pre-2006
buildings (CZ specific)
N/A N/A 2019 Existing LR Chapter 15.26.040 Ord. No. 2020- 3495
Daly City PV 5/10/2021 7/15/2021 N/A
(see All-electric sheet)
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
2019 LR Res NC /
2019 Non Res NC Section 15.60.030 Ord. No. 1448
Davis EE 10/8/2019 1/22/2020
New SF: All-electric OR Mixed
Fuel, EDR margin of 9.5; New
LR MF: Mixed fuel, EDR margin
of 10; electric-ready
N/A N/A 2019 LR Res New
Construction 8.01.092 Ord. No. 2565
East Palo Alto PV 10/20/2020 12/9/2020 N/A
(see All-electric sheet)
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
2019 LR Res NC /
2019 Non Res NC Ord. No. 07-2020
Emeryville PV 9/13/2021 N/A
(see All-electric sheet)
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New Hotel/Motel: PV system
to fill solar zone (>15% of roof
area) as defined in Sec.
110.11
2020 LR Res NC /
2019 Non Res NC Section 8-10.03 Ord. No. 21-006
Carlsbad
2022-5-25
2 180 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
PV 10/13/2021 N/A
New: PV of 5 kW min. for <
10,000 sq. ft. and 15 kWdc
per 10,000 sq. ft. for > 10,000
sq. ft. OR TDV valuation
method (includes additions
that increase roof by 1,000
sq. ft and alterations with
permit value over $1,000,000
that affects 75% of floor area
New: PV of 5 kW min. for <
10,000 sq. ft. and 15 kWdc
per 10,000 sq. ft. for > 10,000
sq. ft. OR TDV valuation
method (includes additions
that increase roof by 1,000
sq. ft and alterations with
permit value over $1,000,000
that affects 75% of floor area
2019 LR Res NC /
2019 Non Res NC Section 120.10 Ord. 2021-13
EE 10/13/2021
Additions/Alterations of pre-
1978 buildings >$50k: duct
sealing OR cool roof
Additions/Alterations of post-
1978 buildings >$50k: LED
lighting package OR insulated
hot water pipes OR upgraded
water fixtures;
Exception for buildings that
score >7 on DOE Home Energy
Score
Additions/Alterations of pre-
1978 >$50k: R-38 attic
insulation
Additions/Alterations of 1978-
1990 buildings >$50k: duct
sealing OR cool roof
Additions/Alterations of 1991-
present buildings: LED lighting
package OR water heating
package;
Exception for buildings that
score >7 on DOE Home
Energy Score
Additions/Alterations of 1,000
sq. ft. >$200k: Inclusion of
outdoor lighting- one
prescriptive measure / Steel
Framing- prescriptive
measure
2019 Existing LR Section 23.12.080 Ord. 2021-13
Half Moon Bay PV 12/21/2021 N/A
(see All-electric sheet)
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New Hotel/Motel: PV system
to fill solar zone (>15% of roof
area) as defined in Sec.
110.11
2020 LR Res NC /
2019 Non Res NC Section 140.3 Ord. No. C-2021-
Encinitas
2022-5-25
3 181 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
EE 3/17/2020 6/10/2020 N/A
(see All-electric sheet)
New: All-electric OR 10%
compliance margin
New: All-electric OR 10%
compliance margin (15% for
Office/Retail)
PV 3/17/2020 6/10/2020 N/A
(see All-electric sheet)
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
Los Angeles
County EE 11/26/2019 4/8/2020
New and Re-roof: Low-slope
Aged Refl. > 0.65, TE > 0.85,
SRI > 78
Steep-slope: Aged Refl. > 0.25,
TE > 0.85, SRI > 20
New and Re-roof: Low-slope
Aged Refl. > 0.65, TE > 0.75,
SRI > 78
Steep-slope: Aged Refl. >
0.25, TE > 0.75, SRI > 20
New and Re-roof: Low-slope
Aged Refl. > 0.68, TE > 0.85,
SRI > 82
Steep-slope: Aged Refl. >
0.28, TE > 0.85, SRI > 27
2016 Cool Roofs Title 31 Ord No. 2019-0061
Marin County EE 10/8/2019 12/11/2019
New: All-electric OR
Limited Mixed-Fuel prewire for
induction, EE EDR Margin > 3
OR
Mixed-Fuel, pre-wire for
induction, EE EDR Margin > 3
and Total EDR Margin > 10
New: All-electric OR
Limited Mixed-Fuel: 5%
compliance margin, prewired
for induction OR
Mixed-Fuel: 10% compliance
margin, pre-wired for
induction
New: All-electric OR
Limited Mixed-Fuel: 5%
compliance margin, prewired
for induction OR Mixed-Fuel:
10% compliance margin, pre-
wired for induction
2019 LR Res NC /
2019 Non Res NC 19.04.130 Ord. No. 3712
Menlo Park PV 9/24/2019 12/11/2019 N/A
(see All-electric sheet)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft. (some
exceptions)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft. (some
exceptions)
2019 LR Res NC /
2019 Non Res NC 12.16.110.10 Ord. No. 1057
Millbrae PV 11/10/2020 1/25/2021 N/A
(see All-electric sheet) New: PV on 50% of roof area New: PV on 50% of roof area 2020 LR Res NC / 2019 Non Res NC 9.50 Ord. No. 2020-
Mill Valley EE 11/18/2019 4/8/2020
New: All-electric OR
Limited Mixed-Fuel: prewire
for induction, with EE EDR
Margin > 3 OR
Mixed-Fuel, pre-wire for
induction, EE EDR Margin > 3
and Total EDR Margin > 10
New: All-electric OR
Limited Mixed-Fuel: 5%
compliance margin, prewired
for induction OR
Mixed-Fuel: 10% compliance
margin, pre-wired for
induction
N/A 2019 LR Res NC /
2019 Non Res NC Chapter 14.48 Ord. No. 1313
Hayward 2019 LR Res NC /
2019 Non Res NC Ord. No. 20-059-1.02
2022-5-25
4 182 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
EE 12/3/2019 2/20/2020
New: All-electric OR
Elec. Space and Water Heat:
Eff. EDR Margin of 2 for SF and
1 for MF
Mixed-Fuel: Total EDR Margin
of 10 for SF and 11 for MF;
AND electric-ready
New HR MF/ Hotel: All-
electric OR
> 6% compliance
magin AND electric-ready
New: All-electric OR Office &
Retail: >14% compliance
margin; Industrial/
Manufacturing + 0%; All other
NR occupancies > 6%
compliance margin; AND
electric-ready
PV 12/3/2019 2/20/2020 N/A N/A
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Mountain
View PV 11/12/2019 2/20/2020 N/A
(see All-electric sheet) New: PV on 50% of roof area New: PV on 50% of roof area 2019 LR Res NC / 2019 Non Res NC
Chapter 8, Article 1, Division 3, Section 8.20 Ord. No. 17.19 Pacifica PV 11/25/2019 4/8/2020 N/A
(see All-electric sheet)
New: PV of 3 kW min. for
< 10,000 sq. ft. and 5 kW
min. for > 10,000 sq. ft.
N ew: PV of 3 kW min. for
< 10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
2019 LR Res NC /
2019 Non Res NC Section 8.6.08 Ord. No. 852-CS
EE 12/2/2019 2/20/2020 N/A
(see All-electric sheet)
New: All-electric OR > 5%
compiance margin AND
electric-ready
New: All-electric OR Office &
Retail: >12% compliance
margin; Industrial/
Manufacturing + 0%; All other
NR occupancies > 5%
compliance margin; AND
electric-ready
PV 12/2/2019 2/20/2020 N/A
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
Palo Alto
Title 2, Chapter 11, Section 2
16.17.040 et. seq.
Ord. No. 65 1482019 LR Res NC /
2019 Non Res NC
2019 LR Res NC /
2019 Non Res NC Ord. No. 5485
Milpitas
2022-5-25
5 183 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
EE 2/1/2021 5/12/2021 Add/Alts: > $25k Prescriptive
EE reqs. N/A N/A
2019 Cost
Effectiveness Study for
Existing LR Residential
Building Upgrades
Section 8.02.020
PV 2/1/2021 5/12/2021 Add/Alts: Additional level or
roof area increased by >30% N/A N/A
2019 Cost-
Effectiveness Study:
Low-Rise Residential
Addendum
Section 8.02.070
Redwood City PV 9/21/2020 12/9/2020 N/A
(see All-electric sheet)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
(some exceptions)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
(some exceptions)
2019 LR Res NC /
2019 Non Res NC Section 9.255 Ord. No.
Richmond PV 3/3/2020 6/10/2020 N/A
(see All-electric sheet)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
2019 LR Res NC /
2019 Non Res NC Chapter 6.02.100 Ord No. 06-20 NS
San Anselmo EE 4/14/2020 9/9/2020
New: All-electric OR
Limited Mixed-Fuel prewire for
induction, EE EDR Margin > 3
OR
Mixed-Fuel, pre-wire for
induction, EE EDR Margin > 3
and Total EDR Margin > 10
New: All-electric OR
Limited Mixed-Fuel: 5%
compliance margin, prewired
for induction OR
Mixed-Fuel: 10% compliance
margin, pre-wired for
induction
New: All-electric OR
Limited Mixed-Fuel: 5%
compliance margin, prewired
for induction OR Mixed-Fuel:
10% compliance margin, pre-
wired for induction
2019 LR Res NC /
2019 Non Res NC Section 9-19.040 Ord. No. 1145
San Carlos PV 1/25/2021 5/12/2021 N/A
(see All-electric sheet)
New: PV of 2 W/sq. ft for
buildings < 10 habitable
stories
New: PV of 2 W/sq. ft for
buildings < 3 habitable stories
, healthcare facilities
excepted
2019 LR Res NC /
2019 Non Res NC Section 9.255 Ord. No. 1570
Piedmont Ord. No. 750NS
2022-5-25
6 184 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
San Francisco EE 1/7/2020 4/8/2020 New: All-electric OR Mixed Fuel- Total EDR Score < 14
New HRR/Hotel: All-electric
OR Mixed-Fuel and >10%
compliance margin
2019 LR Res NC /
2019 Non Res NC
Section 4.201.3
Section 5.201.3 Ord. No 003-20
San Jose EE 10/1/2019 12/11/2019 N/A
(see All-electric sheet)
New HR MF/ Hotel: All-
electric OR > 6% compliance
margin and electric-ready
New: All-electric OR Office &
Retail: >14% compliance
margin; Industrial/
Manufacturing + 0%; All other
NR occupancies > 6%
compliance margin; and
electric-ready
2019 LR Res NC /
2019 Non Res NC 24.12.100 Ord. No. 30311
EE 7/7/2020 8/11/2020
New SF: All-electric OR Mixed
Fuel, EDR margin of 9; New LR
MF: Mixed fuel, EDR margin of
9.5 AND electric-ready
New: All-electric OR
Hotel/HRR > 9% compliance
margin; AND electric-ready
New: All-electric OR
Office/Retail 15% compliance
margin, Others 5%
compliance margin AND
electric ready
Chapter 15.50 Ord. No. 1684
PV 7/7/2020 8/11/2020 N/A
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
New: PV system to fill solar
zone (>15% of roof area) as
defined in Sec. 110.10
Chapter 15.04.110 Ord. No. 1684
EE
(see All-electric sheet)
New SF and Duplexes: All-
electric OR
min Eff. EDR reduction of 2.5
N/A
(see All-electric sheet)
New Office Buildings: All-
electric OR Mixed-Fuel + 10%
compliance margin
2019 LR Res NC /
2019 Non Res NC 23.23.040 Ord. No. 2019-9
PV Prewire PV system for
expansion to all-electric design
New: PV: ≥ 3 kW. Alternative:
Solar thermal ≥ 40 sq ft
collector area
New: <10,000 s.f.: min. 3 kW
PV; 10,000+ s.f.: 5 kW PV
Alternative: Solar thermal ≥
40 s.f. collector area
2019 LR Res NC /
2019 Non Res NC 23.24.030 Ord. No. 2019-9
EE 10/5/2020 12/9/2020
(see All-electric sheet)
New 100% Affordable LR MF:
All-electric OR
at least .5 EDR less than
Standard Design OR
Prescriptive measures
New 100% Affordable HR MF:
All-electric OR
>5% compliance margin OR
Prescriptive measures
(see All-electric sheet) 2020 LR Res NC /
2019 Non Res NC 23.24.020 Ord. No. 2020-17
2019 LR Res NC /
2019 Non Res NC
San Luis
Obispo
12/11/2019
San Mateo
(City)
9/3/2019
2022-5-25
7 185 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
San Rafael EE 11/18/2019 4/8/2020
New: CALGreen Tier 1: Mixed
fuel, EDR ≥ 10, All-elec EDR ≥
14 New: CALGreen Tier 1 (5%
compliance margin)
New: CALGreen Tier 1 (10%
compliance margin)
2019 LR Res NC /
2019 Non Res NC Chapter 12.100 Ord. No. 1974
Santa Clara PV 11/16/2021 N/A
(see All-electric sheet)
New HR MF/ Hotel ≤ 10
stories: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
New ≤ 3 stories: PV of 3 kW
min. for < 10,000 sq. ft. and 5
kW min. for > 10,000 sq. ft.
Exception for healthcare
facilities Alternative: Solar
thermal
2020 LR Res NC /
2019 Non Res NC Chapter 15.36.090 Ord. No. 2034
Santa Clara
County PV 12/14/2021 N/A
(see All-electric sheet)
New: PV system to fill 15% of
roof area
New: PV system to fill 15% of
roof area
2021 LR Res NC /
2019 Non Res NC Section C3-63 Ord. NS-1100.135
EE
New: All-electric OR
Mixed-Fuel with CalGreen Tier
1 New HRR/Hotel: All-electric
OR Mixed-Fuel and >5%
compliance margin
New: All-electric OR Mixed-
Fuel and >10% compliance
margin
2019 LR Res NC /
2019 Non Res NC 8.36.020 Ord. No. 2617
PV Major Additions: PV system 1.5
watts per sq. ft.
New and Major Additions: 2
watts per sq. ft.
New and Major Additions: 2
watts per sq. ft.
2019 LR Res NC: PV +
Additions Addendum 8.106.055 Ord. No. 2617
Solana Beach PV 12/8/2021 N/A N/A
New: PV of 5 kW min. for <
10,000 sq. ft. and 15 kWdc
per 10,000 sq. ft. for > 10,000
sq. ft. OR TDV valuation
method
Add/Alts: additions > 50%
additional floor area/ permit
value of $300,000/or alters
50% of structural components
2021 LR Res NC /
2019 Non Res NC Chapter 15.22.04 Ordinance 518
Santa Monica 9/24/2019 12/11/2019
2022-5-25
8 186 of 199
Jurisdiction Ord.
Type
Council
Adopted
Date
CEC
Approval
Date
Single Family and Low-rise
Multifamily Requirement
High-rise Multifamily
Requirement
Nonresidential
Requirement
Cost-effectiveness
Study Municipal Code Link Ordinance
2019 Code Cycle - Locally Adopted Energy Ordinances
Sunnyvale PV 12/1/2020 1/25/2021 N/A
(see All-electric sheet)
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
New: PV of 3 kW min. for <
10,000 sq. ft. and 5 kW min.
for > 10,000 sq. ft.
Alternative: Solar thermal
> 40 sq.ft. collector area
2019 LR Res NC /
2019 Non Res NC Section 16.42.090 Ord. No. 3168-20
West
Hollywood
EE, Cool
Roofs 8/19/2019 12/11/2019
New or Alteration > 10,000 sq.
ft.: PV to offset 15% of usage
OR solar thermal with min. .5
solar fraction OR vegetative
roof covering min. 30%
New or Alteration > 10,000
sq. ft.: PV to offset 15% of
usage OR solar thermal with
min. .5 solar fraction OR
vegetative roof covering min.
30%
New or Alteration > 10,000
sq. ft.: PV to offset 15% of
usage OR solar thermal with
min. .5 solar fraction OR
vegetative roof covering min.
30%
2019 NR+ Retrofits
PV / 2019 Non Res
NC
19.20.060 Ord. No. 19-1072
All rights reserved, except that this document may be used, copied, and distributed without modification This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2021 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison. 2022-5-25
9 187 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
Alameda All-
Electric 6/1/2021 8/11/2021 New: All-electric (excluding ADUs) New: All-electric
New: Exception for non-electric
space heating and process
systems in Fire, High-Hazard,
Laboratory occupancies;
public/employee cafeteria; pre-
wire for electric
13-11.3 Ord. No.
Berkeley All-
Electric 7/16/2019 N/A New: All-electric New: All-electric New: All-electric Chapter 12.80 Ord. No. 7,672-N.S Brisbane All-
Electric 12/12/2019 2/20/2020
New: Exception for
cooktops/fireplaces; pre-wire
for electric New: All-electric
New: Except Life science
occupancies and gas specific for
profit kitchen
15.83.060 Ord. No. 643
Burlingame All-
Electric 8/17/2020 10/14/2020
New: Exception for
indoor/outdoor cooking
appliances and fireplaces; pre-
wire for electric. Adds/Alts: >
50% valuation when HVAC
included
New: All-electric
New: Exception for-profit kitchen
cooking equipment; pre-wire for
electric
110.0 Ordinances 1979 ,
1980, 1981
Campbell All-
Electric 2/18/2020 1/25/2021
New: All-electric space/water
heating. Natural gas OK for
other uses; pre-wire for electric
N/A N/A 18.18.020 Ord. No 2,260
Contra Costa County All-
Electric 1/18/2022 New: All-electric (excluding
dwelling units) New: All-electric New: All-electric Section 74-2.002 Ord. No. 2022-02 Cupertino All-
Electric 1/21/2020 4/8/2020 New: All-electric (excluding ADUs) New: All-electric
New: Exception for Fire, High-
Hazard, Laboratory, and "Essential
Facilities" occupancies; pre-wire
for electric
16.54.100 et. seq. Ord. No. 19-2193
Daly City All-
Electric 5/10/2021 7/15/2021 New: All-electric (excluding dwelling units) New: All-electric
New: Exception for Fire, High-
Hazard, Laboratory occupancies
and for-profit kitchen cooking
equipment
Section 15.160.020 Ord. No. 1448
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
2022-5-25
10 188 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
East Palo Alto All-
Electric 10/20/2020 12/9/2020
New: Exception for ADUs; and
cooktops/fireplaces; pre-wire
for electric
New: Exceptions
cooktops/fireplaces, gas water-
heating for affordable housing;
pre-wire for electric
New: Exception for Life Science
buildings, Emergency operations,
and for-profit cooking; pre-wire
for electric
Chapter 15.25 Ord. No 07-2020
Emeryville All-
Electric 9/13/2021
New: All-electric (including
ADUs > 400 sq. ft.)
Adds/Alts: > 50% of foundation
or existing framing
N/A N/A Section 8-10.03 Ord. No. 21-006
Encinitas All-
Electric 10/13/2021 New: All-electric New: All-electric New: Exception for Essential
facilities and for-profit kitchens
with business-related reason to
cook with flame
Section 23.12.080 Ord. 2021-13
Fairfax All-
Electric 9/1/2021 New: All-electric New: All-electric
New: Exception for public interest
projects and for-profit cooking
equipment
Chapter 15.05 Ord. No.
Half Moon Bay All-
Electric 2/15/2022
New: All-electric + Prohibition
on conversion to Mixed-Fuel
buildings + Termination of gas
service 2045
New: All-electric + Prohibition
on conversion to Mixed-Fuel
buildings + Termination of gas
service 2045
New: All-electric + Prohibition on
conversion to Mixed-Fuel
buildings, Exception for
commercial greenhouses
Section 14.06.030 Ord. No. C-2022-
Hayward All-
Electric 3/17/2020 6/10/2020 New: All-electric (including ADUs > 400 sq. ft.)
New: All-electric OR 10%
compliance margin
New: All-electric OR 10%
compliance margin (15% for
Office/Retail) 9-1.02 Ord. No. 20-05
Healdsburg All-
Electric 12/16/2019 2/20/2020
New: Exception for cooktops,
fireplaces, pool/spa; pre-wire
for electric
New: Exception for cooktops,
fireplaces, pool/spa; pre-wire
for electric
New: Exception for cooktops,
fireplaces, pool/spa, Essential
Services, technical processes; pre-
wire for electric
15.04.08 Ord. No. 1196
2022-5-25
11 189 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
Hillsborough All-
Electric 5/9/2022
New: All-electric space/water
heating (including ADUs).
Natural gas OK for other uses;
pre-wire for electric
N/A N/A Section 15.10.50 Ord. No.
Los Altos Hills All-
Electric 2/20/2020 12/9/2020
New: All-electric space/water
heating (including ADUs).
Natural gas OK for other uses;
pre-wire for electric
N/A N/A 8.1.6.02 Ord. No. 589
Los Altos All-
Electric 11/10/2020 1/25/2021
New: Exception for
cooktops/fireplaces; pre-wire
for electric
New: All-electric for
developments > 10 units
New: Exception for Scientific
Laboratory/ Public buildings and
for-profit cooking; prewire for
electric
Chapter 12.22 Ord. No. 2020-470A-
C
Los Gatos All-
Electric 12/17/2019 2/20/2020
New: All-electric (including
ADUs); pre-wire for battery
storage
N/A N/A Chapter 6, Article 7, Section
6.70.010 Ord. No. 2299
Menlo Park All-
Electric 9/24/2019 12/11/2019
New: All-electric space/water
heating and clothes dryers.
Natural gas OK for
cooktops/fireplaces; pre-wire
for electric
New: All-electric New: All-electric 12.16.010 Ord. No. 1057 Millbrae All-
Electric 11/10/2020 1/25/2021
New: All-electric space/water
heating and clothes dryers.
Natural gas OK for
cooktops/fireplaces; pre-wire
for electric
New: All-electric
New: Exception for Life Science/
Public buildings. For-profit
cooking may appeal for exception;
prewire for electric
9.50 Ord. No. 2020-
Morgan Hill All-
Electric 10/23/2019 N/A New: All-electric New: All-electric New: All-electric 15.63 Ord. No. 2306 N.S. 2022-5-25
12 190 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
Mountain View All-
Electric 10/22/2019 2/20/2020
New SF and Duplexes:
Exception for
cooktops/fireplaces; pre-wire
for electric.
New LR MF: Exception for-profit
kitchen cooking equipment
New: exception for F, H, and L
occupancies and for-profit
kitchen cooking equipment
New: Exception for Fire, High-
Hazard, Laboratory occupancies
and for-profit kitchen cooking
equipment
Chapter 8, Division 3,
Section 8.20 Ord. No. 17.19
Oakland All-
Electric 12/1/2020 New: All-electric New: All-electric New: All-electric Ord. No.
Ojai All-
Electric 11/10/2020
New: Exception for ADUs,
pool/spa, for-profit kitchen
cooking equipment
New: All-electric New: Exception for-profit kitchen
cooking equipment Section 9-1.1002 Ord. No.
Pacifica All-
Electric 11/25/2019 4/8/2020
New: Exception for ADUs; and
cooktops/fireplaces; pre-wire
for electric.
New LR MF: Exception for-profit
kitchen cooking equipment
New: Exception for
cooktops/fireplaces; pre-wire
for electric
New: Exception for Fire and Police
occupancies and for-profit kitchen
cooking equipment
Section 8.6 Ord. No. 852-CS
Palo Alto All-
Electric 12/2/2019 2/20/2020 New: All-electric
New: All-electric OR > 5%
compiance margin; electric-
ready
New: All-electric OR Office &
Retail: >12% compliance margin;
Industrial/ Manufacturing + 0%;
All other NR occupancies > 5%
compliance margin; pre-wire for
electric
16.17.040 et. seq. Ord. No. 5485
Petaluma All-
Electric
5/17/2021 New: All-electric
Add/Alts: > 50% exterior wall
perimeter/ floor area
New: All-electric
Add/Alts: > 50% exterior wall
perimeter/ floor area
New: All-electric
Add/Alts: > 50% exterior wall
perimeter/ floor area. Exception
for Essential Services
17.09 Ord. No.
2022-5-25
13 191 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
Piedmont All-
Electric 2/1/2021 5/12/2021 New: All-electric N/A N/A 8.02.070 Ord. No. 750NS Redwood City All-
Electric 9/21/2020 12/9/2020 New: All-electric (excluding ADUs)
New: exception for Fire, High-
Hazard, and Laboratory
occupancies and for-profit
kitchen cooking equipment;
additional exceptions
New: exception for Fire, High-
Hazard, and Laboratory
occupancies and for-profit kitchen
cooking equipment; additional
exceptions
Section 9.249 Ord. No.
All-
Electric 3/3/2020 6/10/2020
New: All-electric space/water
heating and clothes dryers.
Natural gas OK for
cooktops/fireplaces; pre-wire
for electric
Replace/Upgrade Equipment:
all-electric
New: All-electric
New: Exception for Fire/Police,
Life Sciences, For-profit kitchen
cooking equipment; pre-wire for
electric
Chapter 6.02.100 Ord No. 06-20 NS
All-
Electric 11/16/2021 New: All-electric New: All-electric New: Exception for public interest projects Chapter 9.64 Ord. No.
Sacramento All-
Electric 6/1/2021
New Buildings ≤ 3 Stories: All-
electric
EFFECTIVE 2023
New Buildings ≥ 4 Stories: All-
Electric
EFFECTIVE 2026
New Buildings ≤ 3 Stories: All-
electric
EFFECTIVE 2023
New Buildings ≥ 4 Stories: All-
Electric
EFFECTIVE 2027
New Buildings ≤ 3 Stories: All-
electric
EFFECTIVE 2023
New Buildings ≥ 4 Stories: All-
Electric
EFFECTIVE 2028
Chapter 15.30.030 Ord. No.
San Carlos All-
Electric 1/25/2021 5/12/2021
New: Exception for
cooktops/fireplaces; pre-wire
for electric
Adds/Alts: > 50% of structure
New: exception Laboratory
occupancies and for-profit
kitchen cooking equipment
upon review; additional
exceptions
New: exception Laboratory
occupancies and for-profit kitchen
cooking equipment upon review;
additional exceptions
Section 110.0 Ord. No. 1570
Richmond
2022-5-25
14 192 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
San Francisco All-
Electric 11/17/2020 New: All-electric New: All-electric New: All-electric Section 106A Ord. No. 9/17/72019 N/A New: All-electric N/A N/A Chapter 17.845 Ord No. 30330 12/1/2020 N/A New New
New: Exception for hospitals and
facilities with a Distributed Energy
Resource
Chapter 17.845 Ord. No. 30502
San Mateo City All-
Electric 10/5/2020 12/9/2020
New: All-electric (including
ADU's) N/A New Office Buildings: All-electric Section 23.24 Ord. No. 2020-17 San Mateo County All-
Electric 2/25/2020 9/9/2020 New: All-electric New: All-electric New: Exception for Laboratories,
Emergency operations, and for-
profit cooking (requires approval)
Section 9200 Ord No. 4824
Santa Clara All-
Electric 11/16/2021
New: All-electric
Add/Alts: > 50% exterior wall /
50% wall plate raised
New: Exception for on-site
laundry in hotels > 80 rooms
Add/Alts: > 50% exterior wall /
50% wall plate raised
New: Exception for on-site laundry
in hotels > 80 rooms
Add/Alts: > 50% exterior wall /
50% wall plate raised
Chapter 15.36 Ord. No. 2034
Santa Clara County All-
Electric 12/14/2021 New: All-electric New: All-electric New: exception for Fire, High-
Hazard, Hospitals, Correction
Facilities, and Laboratory
occupancies
Section C3-62 Ord. NS-1100.135
Santa Barbara All-
Electric 7/27/2021 New: All-electric New: All-electric
New: Exception for public interest
projects, Laboratories, clean
rooms, and for-profit cooking
equipment
Section 22.100.040 Ord. No.
Santa Cruz All-
Electric 4/14/2020 N/A New: All-electric (including
ADUs > 750 sq. ft.) New: All-electric
New: Exception for industrial heat
processes and for-profit kitchen
cooking equipment
Chapter 6.100 Ord. No. 2020-06
San Jose All-
Electric
2022-5-25
15 193 of 199
Jurisdiction Ord.
Type
Council
Adopted Date
CEC Approval
Date Municipal Code Link Ordinance
Single Family and Low-rise
Multifamily High-rise Multifamily Nonresidential
2019 Code Cycle - Locally Adopted All-Electric Only Ordinances Scope
Santa Rosa All-
Electric 11/12/2019 2/20/2020 New: All-electric N/A N/A Chapter 18-33.040 Ord. No. 2019-019 Saratoga All-
Electric 12/4/2019 4/8/2020
New: All-electric space/water
heating. Natural gas OK for
cooktops/fireplaces/clothes
dryer; pre-wire for electric
New: All-electric space/water
heating; pre-wire for electric
New: All-electric space/water
heating. Except public agency
owned emergency centers; pre-
wire for electric
Chapter 16.51.015 Ord. No. 366
Solana Beach All-
Electric 12/8/2021
New: Exception for cooktops,
fireplaces; pre-wire for electric
appliances AND battery storage
Add/Alts: > 700 sq. ft or
alterations > 50% of structural
components)
New: Exception for cooktops,
fireplaces; pre-wire for electric
New: Exception for for-profit
cooking; pre-wire for electric
Add/Alts: additions > 50%
additional floor area/ permit value
of $300,000/or alters 50% of
structural components)
Chapter 15.22.050 Ordinance 518
South San Francisco All-
Electric 6/9/2021 New: All-electric Adds/Alts: >
50% of structure New: All-electric N/A Chapter 15.22 Ord. No.
Sunnyvale All-
Electric 12/1/2020 1/25/2021 New: All-electric New: All-electric New: Exception for Fire, High-
Hazard, Laboratory occupancies
and for-profit kitchen cooking
equipment; prewire for electric
Chapter 16.42 Ord. No. 3168-20
This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2021 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison.
All rights reserved, except that this document may be used, copied, and distributed without modification 2022-5-25
16 194 of 199
Jurisdiction Ord.
Type
Council
Adopted Date Exceptions Ordinance
Single Family, Duplexes, and
Townhouses Multifamily Nonresidential - Office Nonresidential - Other Albany EV 12/20/2020 N/A New MF: 20% of spaces
equipped with EVCS N/A N/A Resolution 2020-
127
Brisbane EV 12/12/2019
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: Level 2 EV-Ready space
per unit / min. 50% required
guest spaces EVCS spaces
New Office: >10 spaces- 15%
equipped with Level 2 EVCS + 10
% Level 1 EV-Ready +
25% Level 1 EV-Capable
New Other NR: >10 spaces- 15%
equipped with Level 2 EVCS +
10 % Level 1 EV-Ready
Ord. 643
Burlingame EV 8/17/2020
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: 10% of units with Level 2
EV-Ready space ; remaining
units with Level 1 EV-Ready
New Office: >10 spaces- 10%
equipped with Level 2 EVCS +
10 % Level 1 EV-Ready
New Other NR: >10 spaces- 6%
equipped with Level 2 EVCS +
5 % Level 1 EV-Ready
ADU/JADU without parking
facilities
Ord.
1979/1980/1981
Carlsbad EV 3/12/2019
New: Level 2 EV-Ready space
per unit Add/Alts: >$60k OR
panel upgrade
New: 10% of units with Level 2
EV-Capable space AND 50% of
those spaces installed with EVSE
Add/Alts: >$200k
ADU/JADU without parking
facilities / utility service
cost > $400
Ord. CS-349
Contra Costa
County EV N/A New: 5% of spaces EVSE
equipped
New: EVSE charging at each space
required by TABLE 5.106.5.3.3
New: EVSE charging at each space
required by TABLE 5.106.5.3.4
Amendment to 74-
4.006 CGBSC
Colma EV 2/24/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: 15% of units with Level 2
EV-Ready space N/A N/A Ord.
Cupertino EV 1/21/2020
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: < 20 units: Level 2 EV-
Ready space per unit ;
remaining spaces Level 1 EV-
Ready /
> 20 units: 25% of spaces Level 2
EV-Ready
New Office: >10 spaces- 20%
equipped with Level 2 EVCS + 10
% Level 1 EV-Ready + 30% Level 1
EV-Capable
New Other NR: >10 spaces- 6%
equipped with Level 2 EVCS +
5 % Level 1 EV-Ready
ADU/JADU without parking
facilities Ord. 19-2193
Daly City EV 5/10/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: < 20 units: Level 2 EV-
Ready space per unit/
> 20 units: 75% of spaces Level 1
EV-Ready ; remaining units
Level 2 EV-Ready
New: 10% of spaces to be Level 2
EVCS + 10% spaces Level 2 EV-
Ready + 30% Level 2 EV-Capable
New Other NR: 6% equipped with
Level 2 EVCS + 5 % Level 1 EV-
Ready;
>100 spaces- 80kW fast charger
per 100
Ord. 1449
Davis EV 4/23/2019 New: Level 2 EV-Ready space
per unit
New: < 20 units: Level 1
charging at 5% of spaces / >20
units: Level 2 charging at 1% of
spaces (min. 1)
Add/Alts: Panel upgrade must
include capacity for 20% Level 2
EV-Capable
N/A Ord. 2554
2019 Code Cycle - Locally Adopted Electric Vehicle Ordinances Scope
New: 10% of units with Level 2 EV-Capable space AND 50% of those spaces installed with EVSE
2022-5-25
17 195 of 199
Jurisdiction Ord.
Type
Council
Adopted Date Exceptions Ordinance
Single Family, Duplexes, and
Townhouses Multifamily Nonresidential - Office Nonresidential - Other 2019 Code Cycle - Locally Adopted Electric Vehicle Ordinances Scope
East Palo Alto EV 10/20/2020
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: 10% of units with Level 2
charging + 90% of units with
Level 1 charging. Outlets may be
shared between two units.
New: Office: >10 spaces- 10%
equipped with Level 2 EVCS + 10%
Level 1 EV-Ready + 30 % EV-
Capable
New Other NR: >10 spaces- 6%
equipped with Level 2 EVCS +
5 % Level 1 EV-Ready
ADU/JADU without parking
facilities + MF: utility
service cost > $4500
Ord. 07-2020
Encinitas EV 11/13/2019 New: Level 2 EV-Ready space
per unit
New: EVSE charging at 15% of
spaces
ADU/JADU without parking
facilities / utility service
cost > $400 per unit
Ord. 2019-22
Fremont EV 4/20/2021 New: Level 2 EV-Ready space
per unit
New: EV-Ready spaces
calculated based on total spaces N/A N/A Utility service cost > $400 per unit Ordinance 05-2021
Half Moon Bay EV 12/21/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: < 20 units: Level 2 EV-
Ready space per unit /
> 20 units: 25% of spaces Level 2
EV-Ready + remaining spaces
Level 1 EV-Ready / Affordable
MF: 10% spaces Level 2
N/A N/A ADU/JADU without parking
facilities Ord. C-2021-
Hayward EV 3/17/2020
New: Two Level 2 EV-Ready
spaces for each unit (one Level
2 if only 1 space exists).
New: < 20 units: Level 2 EV-
Ready space per unit. > 20 units:
75% of spaces Level 2 EV-Ready
; remaining units Level 2 EV-
Capable
New Office: >10 spaces- 20%
equipped with Level 2 EVCS + 30
% Level 2 EV-Ready Capable
New Other: >10 spaces; 15%
equipped with Level 2 EVCS
ADU/JADU without parking
facilities Ord. 20-05
Los Altos EV 10/27/2020
New: Level 2 EV-Ready spaces
for each unit (Two Level 2 if
multiple spaces exist)
New: < 20 units: Level 2 EV-
Ready space per unit/ > 20
units: 25% of spaces Level 2 EV-
Ready + remaining spaces Level
1 EV-Ready
New: Office: >10 spaces- 10%
equipped with Level 2 EVCS + 30
% Level 2 EV-Ready Capable + 10%
Level 1 EV-Ready
New: Other NR: >10 spaces- 6%
equipped with Level 2 EVCS + 5%
Level 1 EV-Ready
ADU/JADU without parking
facilities Ord. 2020-471
Marin County EV 10/8/2019
New: Level 2 EV-Ready space
per unit
Add/Alts: Panel upgrade must
include Level 2-Ready circuit
New: Level 2 EV-Ready space
per dwelling unit
Add/Alts: Panel upgrade must
include capacity for 20% Level 2
EV-Capable spaces
ADU/JADU without parking
facilities Ord. 3712
New: 10% of spaces to be Level 2 EV-Ready + remaining spaces EV- Capable OR 20% spaces Level 2 EV-Ready + EVCS in 5% spaces (min. 2) Add/Alts: Panel upgrade must include capacity for 20% Level 2 EV- Capable
New NR + Hotel/Motel: EVSE charging at 8% of spaces
Add/Alts: > 10k sq. ft.
2022-5-25
18 196 of 199
Jurisdiction Ord.
Type
Council
Adopted Date Exceptions Ordinance
Single Family, Duplexes, and
Townhouses Multifamily Nonresidential - Office Nonresidential - Other 2019 Code Cycle - Locally Adopted Electric Vehicle Ordinances Scope
Millbrae EV 11/10/2020
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: < 20 units: Level 2 EV-
Ready space per unit /
> 20 units: 25% of spaces Level 2
EV-Ready + remaining spaces
Level 1 EV-Ready / Affordable
MF: 10% spaces Level 2
New Office: >10 spaces- 10%
equipped with Level 2 EVCS +
additional 10 % LeMF: utility
service cost > $4500vel 1 EV-
Ready + additional 30% EV-
Capable
New Other NR: >10 spaces- 6%
equipped with Level 2 EVCS +
additional 5 % Level 1 EV-Ready
ADU/JADU without parking
facilities + MF: utility
service cost > $4500
Ord. No. 2020-20
Mill Valley EV 11/18/2019
New: Level 2 EV-Ready per unit
Add/Alts: Panel upgrade must
include Level 2-Ready circuit
New: One Level 2 EV-Ready
space per dwelling unit
ADU/JADU without parking
facilities Ord. 1313
Milpitas EV 12/3/2019
New: Level 1 EV-Ready circuit +
Level 2 EV-Ready circuit per
unit
New: < 20 units: Level 2
charging at 15% of spaces +
Level 1 EV-Capable at 35% of
spaces / >20 units: Level 2
charging at 20% of spaces +
Level 1 EV-Capable at 35% of
spaces
New Office: 5% equipped with
Level 2 EVCS + 10 % Level 1 EV-
Ready + 20% Level 2 EV-Capable
New Other NR: >10 spaces- 4%
equipped with Level 2 EVCS + 3 %
Level 1 EV-Ready;
>100 spaces- 80kW fast charger
per 100
MF Affordable Housing
Projects Ord. 65 148
Mountain View EV 11/12/2019
New: Level 1 EV-Ready circuit +
Level 2 EV-Ready circuit per
unit
New: Level 2 charging at 15% of
spaces + remaining spaces EV-
Ready + Level 3 EVCS for every
100 spaces
Ord. 17.19
Oceanside EV 8/19/2020 N/A Ord. No.
Redwood City EV 9/21/2020
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: <20 units- Level 2 EV-
Ready space per unit ;
remaining spaces Level 1 EV-
Ready / >20 units- 25% of
spaces Level 2 EV-Ready
New Office: >10 spaces- 10%
equipped with Level 2 EVCS +
additional 10 % Level 1 EV-Ready
+ additional 30% EV-Capable
New Other NR: >10 spaces- 6%
equipped with Level 2 EVCS +
additional 5 % Level 1 EV-Ready
ADU/JADU without parking
facilities Ord. No.
Add/Alts: Panel upgrade must include capacity for 20% Level 2 EV- Capable
New Mixed Use: Level 2 charging at 15% of spaces + remaining spaces EV-Ready + Level 3 EVCS for every 100 spaces
New Commercial/Hotel/Motel : < 10 spaces- Level 2 EVCS + EV-Ready remaining spaces / >10 spaces - 15% equipped with Level 2 EVCS + EV- Ready remaining spaces / >100 spaces - Level 3 DC EVCS
New MF and NR: 15% of spaces reserved for ZEV (> 5 parking spaces) and Level 2 charging at 50% of those reserved spaces
2022-5-25
19 197 of 199
Jurisdiction Ord.
Type
Council
Adopted Date Exceptions Ordinance
Single Family, Duplexes, and
Townhouses Multifamily Nonresidential - Office Nonresidential - Other 2019 Code Cycle - Locally Adopted Electric Vehicle Ordinances Scope
Sacramento EV 4/20/2021 N/A New MF: 20% of spaces Level 2 EV-Ready Ord.
San Anselmo EV 4/14/2020
New: Level 2 EV-Ready per unit
Add/Alts: Panel upgrade must
include Level 2-Ready circuit
New: Level 2 EV-Ready space
per dwelling unit
Add/Alts: Panel upgrade must
include capacity for 20% Level 2
EV-Capable spaces
ADU/JADU without parking
facilities Ord. 1145
San Carlos EV 1/25/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
space (Level 2 if only 1 space
exists)
New: 10% of units with Level 2
EV-Ready space ; remaining
units with Level 1 EV-Ready /MF
exception: utility service cost >
$4500
New Office: >10 spaces- 10%
equipped with Level 2 EVCS +
additional 10 % Level 1 EV-Ready
+ additional 30% EV-Capable
New Other NR: ≥10 spaces- 6%
equipped with Level 2 EVCS +
additional 5 % Level 1 EV-Ready
ADU/JADU without parking
facilities / utility service
cost > $400 per unit
Ord.
San Jose EV 10/1/2019 New: Level 2 EV-Ready space
per unit
New: EVSE charging at 10% of
spaces + 20% of spaces EV-
Ready + 70% EV-Capable
ADU/JADU without parking
facilities + Detached
garages
Ord. 30311
San Mateo
County EV 2/25/2020
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: 10% of units with Level 2
EV-Ready space + 40% of units
Level 1 EV-Ready spaces
New Office: >10 spaces- 10%
equipped with Level 2 EVCS + 10
% Level 1 EV-Ready + 30% Level 1
EV-Capable
New Other NR: >10 spaces; 6%
equipped with Level 2 EVCS + 5
% Level 1 EV-Ready
ADU/JADU without parking
facilities + MF: utility
service cost > $4500
Ord. 4824
Santa Clara EV 11/16/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: <20 units- Level 2 EV-
Ready space per unit / >20
units- First 20 units, Level 2 EV
Ready per unit; 25% of spaces
Level 2 EV-Ready 75% Low
power Level 2
New Office: Level 2 EVSE charging
at 35% of spaces + 35% EV-
Capable
New Hotel/Motel: Level 2 EVSE
charging at 10% of spaces + 50%
EV-Capable
New Other NR: EVSE charging at
10% of spaces + 30% EV-Capable Ord. 2034
Santa Clara
County EV 12/14/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: <20 units- Level 2 EV-
Ready space per unit / >20
units- First 20 units, Level 2 EV
Ready per unit; 25% of spaces
Level 2 EV-Ready, remaining
Level 1 EV-Ready
New Office: >10 spaces- 20%
equipped with Level 2 EVCS +
30% Level 1 EV-Capable (Fast
Charger may substitute 11 spaces)
New Other NR: >10 spaces- 10%
equipped with Level 2 EVCS (Fast
Charger may substitute 11 spaces)
ADU/JADU without parking
facilities Ord. NS-1100.135
New: 10% of spaces to be Level 2 EV-Ready + remaining spaces EV- Capable OR 20% spaces Level 2 EV-Ready + EVCS in 5% spaces (min. 2) Add/Alts: Panel upgrade must include capacity for 20% Level 2 EV- Capable
New: EVSE charging at 10% of spaces + 40% EV-Capable
New Hotel/Motel: EVSE charging at 10% of spaces + 50% EV-Capable New: 20% of spaces Level 2 EV-Ready
New Hotel/Motel: 20% of spaces Level 2 EV-Ready
2022-5-25
20 198 of 199
Jurisdiction Ord.
Type
Council
Adopted Date Exceptions Ordinance
Single Family, Duplexes, and
Townhouses Multifamily Nonresidential - Office Nonresidential - Other 2019 Code Cycle - Locally Adopted Electric Vehicle Ordinances Scope
Santa Monica EV 4/28/2020 New: Level 2 EV-Ready space
per unit
New: EVSE charging at 10% of
spaces + 20% of spaces EV-
Ready + 70% EV-Capable
New Office: EVSE charging at 10%
of spaces + 20% EV-Ready + 30%
EV-Capable
New Hotel/Motel: EVSE charging
at 10% of spaces + 30% EV-
Capable
New Other NR: EVSE charging at
10% of spaces + 30% EV-Capable
ADU/JADU without parking
facilities / utility service
cost > $400 per unit
Ord. 2634
Solana Beach EV 12/8/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Capable
space (Level 2 if only 1 space
exists)
New MF/Hotel: Level 2 EVSE
charging at 25% of spaces + 75%
of spaces EV-Capable
New: Level 2 EVSE charging at 20%
of spaces + 15% of spaces EV-
Capable
New: Level 2 EVSE charging at 20%
of spaces + 15% of spaces EV-
Capable
ADU/JADU without parking
facilities Ordinance 518
South San
Francisco EV 6/9/2021
New: Level 2 EV-Ready space
per unit + Level 1 EV-Ready
circuit (Level 2 if only 1 space
exists)
New: < 20 units: Level 2 EV-
Ready space per unit/
> 20 units: 25% of spaces Level 2
EV-Ready + remaining spaces
Level 1 EV-Ready / Affordable
MF: 10% spaces Level 2 +
remaining Level 1
N/A N/A ADU/JADU without parking
facilities Ord. No.
Sunnyvale EV 12/1/2020
New: Level 2 EV-Ready + Level 1
EV-Ready space per unit (Level
2 if only 1 space exists)
New: < 20 units: Level 2 EV-
Ready space per unit /
> 20 units: 25% of spaces Level 2
EV-Ready + remaining spaces
Level 1 EV-Ready / Affordable
MF: 10% spaces Level 2
New Office: >10 spaces- 10%
equipped with Level 2 EVCS +
additional 10 % Level 1 EV-Ready
+ additional 30% EV-Capable
New Other NR: >10 spaces- 6%
equipped with Level 2 EVCS +
additional 5 % Level 1 EV-Ready /
>100 spaces - Level 3 DC EVCS
ADU/JADU without parking
facilities Ord. No. 3168-20
This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2021 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison.
All rights reserved, except that this document may be used, copied, and distributed without modification 2022-5-25