A G E N D A
GLENDALE CITY COUNCIL
COUNCIL CHAMBERS
613 E. Broadway, 2nd Floor
Glendale, CA 91206
Meetings
are
broadcast
live
on
Glendale
TV,
viewable
on
Spectrum
Cable,
channel
6,
and
AT&T
U-
verse,
channel
99. Meetings
are
also
streamed
live
in
high
definition
(HD)
on
the
city's
webpage,
glendaleca.gov/live
,
on
YouTube.com/myglendale
,
and
on
Apple
TV,
Roku,
and
Amazon
Fire
devices
using
a
free
app
called
Screenweave
and
choosing
“Glendale
TV”
from
the
menu.
Meetings
are
also
archived
on
the
City
Website
for
viewing
anytime
at
glendaleca.gov/agendas
.
Call
(818)
548-4013
for
program
schedules.
DVDs
of
the
proceedings
are
available
for
purchase
in
the
City
Clerk's
Office.
For
public
comments
and
questions
during
the
meeting,
call
(818)
937-8100.
Public
comments
on
a
specific
agenda
item
will
be
taken
when
that
agenda
item
is
discussed.
If
you
have
any
question
about
matters
on
the
agenda,
or
requests
for
assistance,
please
contact
the
City
Clerk
at (818) 548-2090 during regular business hours.
PLEASE TURN OFF CELLULAR PHONES WHILE INSIDE THE MEETING LOCATION In
compliance
with
the
Americans
with
Disabilities
Act
(ADA)
of
1990,
auxiliary
hearing
aids,
sign
language
translation,
and
Braille
transcripts
are
available
upon
request.
Assisted
listening
devices
are
available
same-day
upon
request.
At
least
48 hours
(or
two
business
days)
notice
is
required
for
requests
regarding
sign
language
translation
and
Braille
transcription
services.
All
documents
related
to
open
session
items
on
this
agenda
that
are
received
less
than
72 hours
prior
to
this
meeting,
and
are
public
records,
will
be
available
for
review
in
the
Office
of
the
City
Clerk,
613
E.
Broadway, RM 110, Glendale, CA 91206.
Translation
services
are
provided
for
meetings
through
the
use
of
bilingual
staff
for
speakers
who
wish
to
utilize
the
service
as
available.
Speakers
should
state
their
request
by
contacting
the
City
Clerk’s
office
at
(818)
548-2090,
at
least
24 hours
prior
to
the
scheduled
meeting.
Please
specify
the
language
for
which
you
require
translation.
The
exclusive
use
of
City
provided
interpreters
is
not
required and persons are welcome to use their own interpreter or speak in their native language.
JANUARY 24, 2023
ROLL CALL
1. CLOSED SESSION
– 1:00 PM ( To Commence at 3:00 PM)
a.
Conference with Legal Counsel – Anticipated Litigation: Significant exposure litigation pursuant to paragraph subdivisions (d)(2) and (e)(2) of Section 54956.9:
One (1) potential case
1 TYPED 1/19/2023 1:06:06 PM
01 24 23
CC
b.
Conference with real property negotiators. City negotiators attending the closed session are: Roubik Golanian, John Takhtalian, Bradley Calvert, Jason Bradford, Michael J. Garcia, Soua Vang, and Gillian van Muyden. Property location: 212 and 216 S. Brand Blvd. Negotiating Parties: Museum of Neon Art. Instructions to the negotiator(s) will concern the price and terms for the lease of property
2. REGULAR BUSINESS AGENDA
– 6:00 PM
Roll Call
a.
Flag Salute: Mayor Ardy Kassakhian
b.
Invocation: Suzie Abajian, City Clerk
c.
Report of City Clerk, re: Posting of Agenda. The Agenda for the January 24, 2023 Regular Meeting of the Glendale City Council was posted on Wednesday, January 18, 2023, on the Bulletin Board Outside City Hall.
3. PRESENTATIONS AND APPOINTMENTS
a.
Agenda Preview for the Meetings of Tuesday, January 31, 2023 b.
Youth & Government Bill Hearing Night presented by Glendale YMCA and Foothills YMCA
c.
Commendation for Senior Park Services Manager Chris Peplow
4. CONSENT ITEMS
(Including Minutes)
The following are Routine and May be Acted Upon by One Motion. Any Member of Council or the Audience Requesting Separate Consideration May do so by Making Such Request Before Motion is Proposed.
a.
City Clerk, re: Minutes of the Regular City Council Meeting of January 10, 2023 and Special City Council Meetings of January 17, 2023
b.
Public Works, re: Glendale Transportation Center Renovations Project
1. Resolution adopting Plans and Specification No. 3926 for the Glendale Transportation Center Renovation Project and directing the City Clerk to advertise for bids c.
Public Works, re: Central Library Children and Youth Services Renovation Project, Specification No. 3888
1. Resolution adopting Plans and Specifications No. 3888 for the Central Library Children and Youth Services Renovation Project and directing the City Clerk to advertise for bids
2. Motion authorizing an amendment to Contract No. 8001171 with Johnson Favaro, increasing the contract amount by $238,420, for a total not-to-exceed amount of $562,420, and authorizing City Manager or his designee to execute the amendment
5. CITY COUNCIL/STAFF COMMENTS
6. COMMUNITY EVENT ANNOUNCEMENTS (3-Minutes)
7. ADOPTION OF ORDINANCES
8. ACTION ITEMS
a.
Community Development, re: California Energy Commission’s California Automated Permit Processing (CalAPP) Program grant in the amount of $80,000 to support
2 TYPED 1/19/2023 1:06:06 PM
01 24 23
CC
Glendale's incorporation of SolarAPP+ into the Land Management System
1. Motion authorizing the Director of Community Development or designee to execute Grant Agreement with the California Energy Commission for the California Automated Permit Processing (CalAPP) Program in the amount of $80,000
2. Resolution of Appropriation in the amount of $80,000 b.
Glendale Water and Power, re: Scholl Canyon Landfill Biogas Renewable Generation Project
1. Resolution dispensing with competitive bidding and authorizing the City Manager, or his designee, to issue a Full Notice To Proceed (FNTP) to Western Energy Systems, a division of Pen Power Group, LLC (WES) for the sale of Power Island Major Equipment (PIME) and services for the Biogas Renewable Generation Project and authorizing the execution of Amendment No. 1 with WES’ existing contract with the City relating to the PIME, in the not-to-exceed amount of $19,364,855 plus a Ten percent (10%) contingency in the amount of $1,936,486
2. Motion authorizing the City Manager, or his designee, to enter into an Engineer- Procure-Construct (EPC) Contract with ACCO Engineered Systems Inc. (ACCO) for the engineering, design and construction of the Biogas Renewable Generation Project at the Scholl Canyon Landfill, in the not-to-exceed amount of $45,800,200, plus a Ten percent (10%) contingency in the amount of $4,580,020
3. Motion authorizing the City Manager, or his designee, to execute an Amendment to Professional Services Agreement (PSA)No. 8000053 with Stantec Consulting Services, Inc. (Stantec) to increase the contract amount by $235,000 to provide supplemental professional environmental services for the Scholl Canyon Biogas Renewable Generation Project, for a new contract not to exceed amount of $1,668,582
4. Motion authorizing the City Manager, or his designee, to execute a Line Extension Contract with the Southern California Gas Company (SoCalGas), in an amount no to exceed $100,000, for construction of natural gas piping and a meter set assembly related to the Biogas Renewable Generation Project
5. Motion authorizing the City Manager, or his designee, to execute an amendment to the existing Professional Services Agreement (PSA) No. 8001391 with Worley Group, Inc. (Worley) to add the sum of $1,100,000 for Owner’s Engineering and Project management services related to the Biogas Renewable Generation Project, for a new contract not to exceed amount of $2,000,000
6. Resolution of appropriation
9. HEARINGS
10. REPORTS - INFORMATION
11. WRITTEN COMMUNICATIONS
12. ORAL COMMUNICATIONS
Discussion is Limited to Items NOT a Part of this Agenda. Each Speaker is Allowed 5 minutes.
Council May Question or Respond to The Speaker But There Will be no Debate or Decision.
The City Manager May Refer the Matter to the Appropriate Department for Investigation and Report.
13. NEW BUSINESS
3 TYPED 1/19/2023 1:06:06 PM
01 24 23
CC
14. ADJOURNMENT
4 TYPED 1/19/2023 1:06:06 PM
01 24 23
CC
5 of 153
1 Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
4A
A G E N D A
GLENDALE CITY COUNCIL
COUNCIL CHAMBERS
613 E. Broadway, 2nd Floor Glendale, CA 91206
JANUARY 10, 2023
ROLL CALL – Absent: Devine, Najarian
1. CLOSED SESSION – 4:07 p.m.
a. Conference with Legal Counsel – Pending Litigation: F.E. & M. Inc. Employee’s Defined Contribution Plan Trust dated July 10, 1984 v. City of Glendale et al., L.A.S.C. Case No. BS16989
b. Conference with Legal Counsel – Pending Litigation: Smith v. City of Glendale, L.A.S.C. No. 20STCV20181
c. Conference with Legal Counsel – Pending Litigation: Abrahamian v. City of Glendale, LASC Case No. BC708092
d. Public Employment – Attorneys
e. Public Employment – Chief of Police
City Attorney Mike Garcia indicated that actions are anticipated on items 1b, 1d, and 1e. Council recessed to closed session at 4:08 p.m.
2. REGULAR BUSINESS AGENDA – 6:03 PM
Roll Call – Absent: Devine, Najarian
a. Flag Salute: Mayor Ardy Kassakhian
b. Invocation: Suzie Abajian, City Clerk
c. Report of City Clerk, re: Posting of Agenda. The Agenda for the January 10, 2023 Regular Meeting of the Glendale City Council was Posted on Wednesday, January 4, 2023, on the Bulletin Board Outside City Hall.
3. PRESENTATIONS AND APPOINTMENTS
a. Agenda Preview for the Meetings of Tuesday, January 17, 2023
4. CONSENT ITEMS INCLUDING MINUTES
The following are Routine and May be Acted Upon by One Motion. Any Member of Council or the Audience Requesting Separate Consideration May do so by Making Such Request Before Motion is Proposed.
a. City Clerk, re: Minutes of the Regular City Council, Special City Council, and Joint City Council and Housing Authority Meetings of December 13, 2022; and Special City Council Meeting of December 16, 2022
Moved: Brotman Seconded: Asatryan
6 of 153
2 Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
b. Glendale Water and Power, re: Alternative Project Delivery Method for the Design- Build of the Pipeline Management Program FY 2022-23, Phase I Project
1. Resolution 23-01 authorizing the General Manager of Glendale Water & Power, or his designee, to issue a Request for Proposals (RFP) using the Design-Build Project Delivery Method for Phase I of the Pipeline Management Program for FY 2022-23, RFP No. 3938, and authorizing the City Clerk to solicit proposals Moved: Brotman Seconded: Asatryan
c. Glendale Water and Power, re: Contract Award for the Rehabilitation of the Emerald Isle 1666 and Glendale Recycled Water Tanks
1. Motion authorizing the City Manager, or his designee, to enter and execute a contract with Advanced Industrial Services, Inc., of Los Alamitos, California for the Emerald Isle 1666 Tank and Glendale Recycled Water Tank Rehabilitation Project (Specification No. 3934 and Plan No. 6960-E), in the amount of $1,375,800 plus a ten percent (10%) contingency of $137,580
Moved: Brotman Seconded: Asatryan
2. Resolution 23-02 of Appropriation for $925,000
Moved: Brotman Seconded: Asatryan
d. Public Works, re: Contract Award for the Design and Removal of Underground Storage Tanks at the Ginger Bremberg Integrated Waste Management Yard, per Specification No. 3918
1. Motion authorizing the City Manager or his designee to execute a contract with Fleming Environmental, Inc., for the Design and Removal of Underground Storage Tanks at the Ginger Bremberg Integrated Waste Management Yard, in the amount of $395,343, plus a 10% contingency ($39,534)
Moved: Brotman Seconded: Asatryan
7 of 153
3 Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
e. Public Works, re: Elevator Renovations at Various Facilities, per Specification No. 3937
1. Resolution 23-03 adopting Specifications No. 3937 for the Elevator Renovations at Various Facilities, and directing the City Clerk to advertise for bids Moved: Brotman Seconded: Asatryan
5. CITY COUNCIL/STAFF COMMENTS
Councilmembers wished the public a Happy New Year.
Councilmember Brotman asked staff to provide a brief update on how Glendale’s homeless population has fared during the storm and what the City is doing to help. Community Services and Parks Director Onnig Bulanikian indicated that the Ascencia and Glendale Police outreach teams have been offering services such as temporary shelters through the City’s hotel voucher program and the Ascencia shelter to the city’s unhoused homeless population.
Currently the 45-bed Ascencia hotel is at a full capacity so the city has been referring individuals to the winter shelter program in Pacoima where they have 65 beds. The City currently has a number of individuals who are service resistant, and they are approached by City staff once or twice a week who would attempt to convince them to receive services.
Brotman shared a story of a group of parents from Franklin Elementary, led by Monica Campagna and Karen Neilsen, who were concerned that lunch foodware was being used once and thrown away. They worked with Glendale Unified school District and the Hobart company to pilot a dishwashing program at the school so students can use regular plates, utensils, and cups. The success of the pilot program led the parents to approach Senator Portantino and ask him to carry a bill that would fund a statewide program to replicate this across the state. Although the bill did not pass, CA Governor Newsom took notice and set aside $15M to fund this program that will help approximately 375 schools shift to reusable foodware, serving up to 225,000 students. Brotman expressed that it was great that so many students will now learn about reusable foodware and take this knowledge home to their parents. He also noted how a few concerned and committed community members can make a difference. He commended the efforts of the Franklin Elementary parents and committed citizens who worked to make this possible. He thanked GUSD for being willing to make some changes, Sen. Portantino for bringing the idea to Sacramento and Governor Newsom for carving out the money to take this program statewide.
Councilmember Asatryan asked staff to provide a report about formalizing a program and partnership with GUSD where Glendale Water and Power and Sustainability Office will work with GUSD students to institute an educational program regarding waste management and proper recycling. City Manager Roubik Golanian informed council that there was a program in place but it was put on hold because of the pandemic. Since the students are now back in school, this program could be brought back to the schools and a report of this program will be presented to council soon. Asatryan travelled to Armenia during the holidays to visit Glendale sister cities, Gyumri and Ghapan, but she was not able to visit Martuni in the Republic of Artsakh, due to the Azerbaijani blockade. She was happy to report that both Gyumri and Ghapan want to re-establish strong ties with the City of Glendale, as there are a lot of opportunities for the cities to work together and collaborate. She stated that the City of Gyumri 8 of 153
4 is leading the way in clean energy projects, and they have reached a point where all their government and school facilities are now utilizing 100% clean energy and are looking for ways to do better waste management. Asatryan stated that the City of Ghapan is in an area where there are Azerbaijani military posts, and some parts of the region, which were in Armenia proper, are now occupied by Azerbaijan. Asatryan visited the Ghapan Museum where she viewed a section that was dedicated to the Glendale and Ghapan Sister City Association. The City of Gyumri is also looking into opening a museum that would highlight their sister cities and they were hoping that the City of Glendale could provide some items that they can include in their museum. Asatryan stated that the Mayor of Ghapan would like to formally invite the City of Glendale for a delegation visit. She also extended a similar invitation to the City of Ghapan. Asatryan visited the Yerevan City Council Meeting as an honorary guest. One of the items discussed at the meeting was their Al Fresco program. The City of Yerevan currently has 26,000 permits for renovations and build-out and their process requires a 15-day turnaround. If a permit has not been issued within this timeframe, the applicant has the right to build whatever they want. One of the things that the City of Yerevan has asked for was collaboration and assistance on Emergency Preparedness since it is an issue all across Armenia and Artsakh.
Mayor Kassakhian stated it was great to be back after a peaceful and uneventful holiday and hoped that everyone was able to observe and celebrate the season. He stated that he attended several events last week in observance of the Armenian Orthodox Christmas including the blessings of the water ceremonies at Glendale Memorial Hospital and Glendale Adventist Hospital. Due to the rainy season, Kassakhian informed the residents that staff was asked to keep an eye and address issues that may arise at the Rockhaven building. He announced that the city will be closed on Monday in observance of Martin Luther King, Jr.
Day. He spoke about the importance of the holiday for Americans as it is a reminder of the struggles that so many have had to fight and the challenges of discrimination that people in our country had to endure until those rights were outlined in the constitution and were accessible to all. He also read an excerpt from the speech Dr. King gave in Oslo, in 1964, during his acceptance of the Nobel Peace Prize.
6. COMMUNITY EVENT ANNOUNCEMENTS (3-Minutes)
Todd Leonard
Tamara Movsesyan
Mike Mohill
Herbert Molano
7. ADOPTION OF ORDINANCES
9 of 153
5 8. ACTION ITEMS
a. Management Services, re: Ordinance Amending Glendale Municipal Code, 1995, By Replacing Chapter 8.42 In Its Entirety, Pertaining to Plastic Waste Reduction Staff Comments:
Roubik Golanian, City Manager
Mike Garcia, City Attorney
Presenting:
David Jones, Sustainability Officer
Public Comments:
Craig Cadwallader
Mike Mohill
Nelson Lau
Jordan Henry
1. Ordinance for Introduction
Introduced by: Brotman
b. Public Works, re: Dunsmore Park Improvements Project Staff Comments:
Roubik Golanian, City Manager
Yazdan Emrani, Director of Public Works
Public Comment:
Jordan Henry
Item will come back later.
1. Motion awarding a construction contract to All American Asphalt, in the amount of $741,260.50, approving a 15 percent contingency in the amount of $111,189.08, rejecting all other bids, and authorizing the City Manager or his designee to execute the contract
c. Public Works, re: Fiscal Year 2023 Americans with Disabilities Act (ADA) Curb Ramp Installation and Sidewalk Repair Program
Staff Comments:
Roubik Golanian, City Manager
Yazdan Emrani, Director of Public Works
10 of 153
6 Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
1. Resolution 23-04 rejecting all bids, dispensing with competitive bidding, and authorizing the Director of Public Works or his designee to directly negotiate with one or more bidders for the Fiscal Year 2023 Americans with Disabilities Act (ADA) Curb Ramp Installation and Sidewalk Repair Program, Specification No. 3913 Moved: Brotman Seconded: Asatryan
9. HEARINGS
a. Public Works, re: Public Hearing Regarding Restructuring and Increase of Solid Waste Collection Rates
Hearing opened at 8:12 p.m. and continued to January 31 Council Meeting.
Staff Comments:
Yazdan Emrani, Director of Public Works
Mike Garcia, City Attorney
Presenting:
Daniel Hardgrove, Assistant Director of Public Works
Public Comments:
Richard Lee
Jordan Henry
Allen Dish
Ann M. Segal
Mike Mohill
Derrick Chevalier
Karen Betzold
Ramella Eraghi
Nelson Lau
Devenne Shudic
Shamaine Bobo
Jennifer Pinkerton
1. Motion to Open and Continue Public Hearing to January 31, 2023 and to extend the period of protest
Moved: Brotman Seconded: Asatryan
2. Resolution Restructuring and Increase of Solid Waste Collection Rates 11 of 153
7 Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Asatryan, Brotman, Kassakhian
None
Devine, Najarian
None
Ayes:
Noes:
Absent:
Abstain:
Council recessed for five minutes and reconvened at 9:25 p.m.
10. REPORTS - INFORMATION
11. WRITTEN COMMUNICATIONS
12. ORAL COMMUNICATIONS
Discussion is Limited to Items NOT a Part of this Agenda. Each Speaker is Allowed 5 minutes. Council May Question or Respond to The Speaker But There Will be no Debate or Decision. The City Manager May Refer the Matter to the Appropriate Department for Investigation and Report.
Derrick Roberson
13. NEW BUSINESS
a. Motion to appoint Manuel Cid as the Chief of Police of the City of Glendale, effective January 16, 2023
Moved: Asatryan Seconded: Brotman
Staff Comments:
Roubik Golanian, City Manager
Christopher Krivak, Police Sgt.
Public Comment:
Mike Mohill
b. Motion to approve the City Attorney’s appointment of Ann M. Maurer as Chief Assistant City Attorney for Liability and Risk Management Moved: Brotman Seconded: Asatryan
c. Motion to resolve the lawsuit entitled Smith v. City of Glendale, L.A.S.C. Case No. 20STCV20181 in the amount of $35,000 in exchange for a full settlement and release of all claims
Moved: Asatryan Seconded: Brotman
12 of 153
8 14. ADJOURNMENT – 9:29 p.m.
Moved: Brotman Seconded: Asatryan
Mayor of the City of Glendale
City Clerk of the City of Glendale
13 of 153
1 Asatryan, Brotman, Devine, Najarian, Kassakhian
None
None
None
Ayes:
Noes:
Absent:
Abstain:
4A
M I N U T E S
SPECIAL MEETING: GLENDALE CITY COUNCIL
COUNCIL CHAMBERS
613 E. Broadway, 2nd Floor Glendale, CA 91206
JANUARY 17, 2023
The Special Public Meeting of the Glendale City Council convened in the City Hall Council Chambers, in said City, at 4:03 p.m. on the above date, pursuant to a call for such meeting signed by the City Clerk of the City Council, and on file with the City Clerk, a copy of which is as follows:
January 12, 2023
Date
A SPECIAL PUBLIC MEETING of the City Council is hereby called to meet at 3:00 PM on Tuesday, January 17, 2023, in the Council Chamber, 613 E. Broadway, 2nd Floor, Glendale, CA 91206 to consider the following item(s) of business, to wit;
1. City Manager, re: Consideration of Proclamation of Local Emergency - 2023 Winter Storms
Written Notice of said meeting was given, which Notice consisted of a copy of the foregoing Call, and was served on each Member of the Council not joining in the Call, and upon the in said City not less than 24 hours before the time fixed in said Call for said meeting, as follows:
Upon Elen Asatryan at 5:00 p.m. January 12, 2023 Glendale, CA Upon Dan Brotman at 5:00 p.m. January 12, 2023 Glendale, CA Upon Paula Devine at 5:00 p.m. January 12, 2023 Glendale, CA Upon Ara Najarian at 5:00 p.m. January 12, 2023 Glendale, CA Upon Ardy Kassakhian at 5:00 p.m. January 12, 2023 Glendale, CA Mayor Kassakhian called the meeting to order at 4:03 p.m.
ROLL CALL
-All Present
-Report of the City Clerk of the City Council, re: Posting of Agenda. The Agenda for the Tuesday, January 17, 2023, Special Public Meeting of the City Council was posted on Thursday, January 12, 2023, on the Bulletin Board Outside City Hall.
1. City Manager, re: Consideration of Proclamation of Local Emergency - 2023 Winter Storms
Presenting:
Roubik Golanian, City Manager
Jonathan Payne, Fire Captain
a. Resolution 23-05 of the City Council of the City of Glendale, California, Ratifying the Emergency Services Director’s Proclamation of the Existence of a Local Emergency Moved: Devine Seconded: Brotman
14 of 153
2 ADJOURNMENT- 4:14 p.m.
Moved: Asatryan Seconded: Brotman
Mayor of the City of Glendale
City Clerk of the City of Glendale
15 of 153
1 4A
A G E N D A
SPECIAL MEETING: GLENDALE CITY COUNCIL
RIVERSIDE RANCHO GRIFFITH MANOR
1551 Flower Street, Glendale, CA 91201
JANUARY 17, 2023
The Special Public Meeting of the Glendale City Council convened in the City Hall Council Chambers, in said City, at 6:17 p.m. on the above date, pursuant to a call for such meeting signed by the City Clerk of the City Council, and on file with the City Clerk, a copy of which is as follows:
January 12, 2023
Date
A SPECIAL PUBLIC MEETING of the City Council is hereby called to meet at 6:00 PM on Tuesday, January 17, 2023, in the Riverside Rancho, Griffith Manor, 1551 Flower Street, Glendale, CA 91201 to consider the following item(s) of business, to wit;
1. Items for Discussion
a. Glendale Narrows Riverwalk and Community Services & Parks Programs b. Garden Bridge Project
c. Residential Horse Manure Collection Program
d. Verdugo Wash Project
e. Housing Element
2. Oral Communications
Written Notice of said meeting was given, which Notice consisted of a copy of the foregoing Call, and was served on each Member of the Council not joining in the Call, and upon the in said City not less than 24 hours before the time fixed in said Call for said meeting, as follows:
Upon Elen Asatryan at 5:00 p.m. January 12, 2023 Glendale, CA Upon Dan Brotman at 5:00 p.m. January 12, 2023 Glendale, CA Upon Paula Devine at 5:00 p.m. January 12, 2023 Glendale, CA Upon Ara Najarian at 5:00 p.m. January 12, 2023 Glendale, CA Upon Ardy Kassakhian at 5:00 p.m. January 12, 2023 Glendale, CA Mayor Kassakhian called the meeting to order at 6:17 p.m.
ROLL CALL
- All Present
- Report of the City Clerk of the City Council, re: Posting of Agenda. The Agenda for the Tuesday, January 17, 2023 Special Public Meeting of the City Council was posted on Thursday, January 12, 2023, on the Bulletin Board Outside City Hall. 16 of 153
2 Staff Comment:
Roubik Golanian, City Manager
1. Items for Discussion
a. Glendale Narrows Riverwalk and Community Services & Parks Programs Presenting:
Onnig Bulanikian, Director of Community Services and Parks Public Comments:
Karen Costa
Joanne Hedge
Liz Radley
Kathy Kottaras
Mike Mohill
b. Garden Bridge Project
Presenting:
Yazdan Emrani, Director of Public Works
c. Residential Horse Manure Collection Program
Presenting:
Yazdan Emrani, Director of Public Works
Public Comment:
Liz Radley
d. Verdugo Wash Project
Councilmember Najarian recused himself at 7:45 p.m. due to a possible conflict of interest and returned after the item.
Presenting:
Bradley Calvert, Director of Community Development
Public Comments:
Jordan Henry
Paul Rabinov
Mike Mohill
Monica Campagna
Vartan Gharpetian
Manuel Magpapian
Patrick Murphy
17 of 153
3 e. Housing Element
Presenting:
Bradley Calvert, Director of Community Development
Staff Comment:
Mike Garcia, City Attorney
Public Comments:
Joanna Hedge
Jordan Henry
Council Member Devine asked staff to provide a report on accessory dwelling unit (ADU) concept in the H overlay zone according to city guidelines and maintain the horse facilities.
Kassakhian seconded and amended to include incentives to certain uses.
2. Oral Communications
Monica Campagna
Joanna Hedge
Allen Dish
Adjournment – 8:55 p.m.
Moved: Devine Seconded: Brotman
Mayor of the City of Glendale
City Clerk of the City of Glendale
18 of 153
4b
CITY OF GLENDALE, CALIFORNIA
REPORT TO THE CITY COUNCIL
AGENDA ITEM
Report: Glendale Transportation Center Renovations Project 1) Resolution adopting Plans and Specification No. 3926 for the Glendale Transportation Center Renovation Project and directing the City Clerk to advertise for bids.
COUNCIL ACTION
Item Type: Consent Calendar
Approved for January 24, 2023 Calendar
EXECUTIVE SUMMARY
The scope of work for the Glendale Transportation Center (GTC) Renovation Project, located at 400 W. Cerritos Avenue, includes the repairs to the wood framed windows and doors, stucco, exterior painting, entry trellis, roof, and landscaping.
Many of the exterior features and finishes of the GTC have exceeded their life expectancy and need replacement or reconditioning. The GTC is a historic structure, and all provisions will be made to preserve, restore, and replicate the original features and finishes. This project will not change any exterior features, finishes, or colors from the current design; the scope of work is solely the repair and rehabilitation of the existing facility with the intent of preserving the facility from further deterioration. 19 of 153
24b
3 8
9 7
COUNCIL PRIORITIES
Infrastructure: The Glendale Transportation Center exterior features will be repaired or replaced in order to preserve the historic facility for the community and future generations.
RECOMMENDATION
Approve the Resolution Adopting Plans and Specification No. 3926 for the Glendale Transportation Center Renovation Project, and direct the City Clerk to advertise for bids.
BACKGROUND/ANALYSIS
Originally known as the Glendale Southern Pacific Railroad Depot, the 6,000 square foot Spanish Colonial Revival structure was built in 1924. In the year 2000 it received a much- needed renovation that sought to maintain the building’s historic integrity as well as the introduction of modern amenities, such as computerized check-in service and Wi-Fi.
Currently, GTC is home to the Southern California Regional Rail Authority, including Metropolitan Transit Authority's Metrolink system, Amtrak, Greyhound and the City’s Beeline. In addition, the GTC links to the City of Los Angeles' Union Station to the south and to the City of Burbank and its entertainment center to the north.
On February 14, 2022, the Public Works Department authorized Architectural Resources Group (ARG) to provide professional architectural and landscaping design services for the building and site improvements. To date, ARG has completed the designs including plans and specifications and the project is now ready to receive bids for construction.
The construction is anticipated to have minimal interruptions to the operations since all the work is on the exterior of the facility. It is anticipated that the project will be completed within four months and is expected to begin in May 2023.
STAKEHOLDERS/OUTREACH
The GTC is a Multi-Modal Transportation facility designed to aid the casual train rider and the regular commuter. The project scope is solely to repair and preserve the existing structure and finishes. The Project Manager will work with onsite staff to minimize any interruptions to daily operations.
FISCAL IMPACT
The Architect’s estimate for the GTC Renovation Project is $1,500,000, a portion of which was approved as part of the FY 2022-23 Budget. Any new appropriation, if needed, will be requested to cover the entire project cost, after the completion of the bidding process, and as part of contract award. The existing City Council approved funding is outlined below:
Existing Appropriation
Amount Account String Funding Source
20 of 153
34b
3 8
9 7
$1,461,739 GL: 52100-2570-PWD-0020-P0000
PL: 51950
Prop. C Local Return Fund
ENVIRONMENTAL REVIEW
This project is Categorically Exempt under California Environmental Quality Act (CEQA) Guidelines as a Class 31 (Historical Resource Restoration/ Rehabilitation) exemption pursuant to the California Code of Regulations, Title 14, Section 15331, which provides:
“Class 31 consists of projects limited to maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent with the Secretary of the Interior’s standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings (1995), Weeks and Grimmer.”
CAMPAIGN DISCLOSURE
Not Applicable.
ALTERNATIVES
Alternative 1: Approve the Resolution adopting Specification No. 3926 for the Glendale Transportation Center Renovation Project and direct the City Clerk to advertise for bids.
Alternative 2: Do not approve the Resolution, in doing so would delay the maintenance required to repair the exterior features and preserve the integrity of the building.
Alternative 3: Consider any other alternative nor proposed by staff.
ADMINISTRATIVE ACTION
Prepared by:
Arthur Asaturyan, Project Manager
Approved by:
Roubik R. Golanian, P.E., City Manager
EXHIBITS / ATTACHMENTS
None.
21 of 153
4b
RESOLUTION NO. __________
A RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA ADOPTING THE PLANS AND SPECIFICATION NO. 3926 FOR THE
GLENDALE TRANSPORTATION CENTER RENOVATION PROJECT AND
DIRECTING THE CITY CLERK TO ADVERTISE FOR BIDS.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:
SECTION 1.The Specifications on file in the City Clerk’s office for the Glendale Transportation Center Renovation Project including the various documents incorporated therein, are hereby approved, adopted, designated, and shall hereafter be known as Specification No. 3926.
SECTION 2.The City Clerk is hereby directed to advertise for bids for the work, equipment and materials described in this Specification adopted by this Resolution.
Adopted this _____ day of ____________, 2023.
____________________________
Mayor, City of Glendale
ATTEST:
__________________________
City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES )
CITY OF GLENDALE )
I, Suzie Abajian, Ph.D., City Clerk of the City of Glendale, certify that the foregoing Resolution No. _____________ was Adopted by the Council of the City of Glendale, California, at a regular meeting held on the _____ day of _________________, 2023, the same was adopted by the following vote:
Ayes:
Noes:
Absent:
Abstain:
___________________________
City Clerk
22 of 153
4c
3 8
9 8
CITY OF GLENDALE, CALIFORNIA
REPORT TO THE CITY COUNCIL
AGENDA ITEM
Report: Central Library Children and Youth Services Renovation Project, Specification No. 3888.
1) Resolution adopting Plans and Specifications No. 3888 for the Central Library Children and Youth Services Renovation Project and directing the City Clerk to advertise for bids.
2) Motion authorizing an amendment to Contract No. 8001171 with Johnson Favaro, increasing the contract amount by $238,420, for a total not-to-exceed amount of $562,420, and authorizing City Manager or his designee to execute the amendment.
COUNCIL ACTION
EXECUTIVE SUMMARY
The scope of work for the Central Library Children and Youth Services Renovation Project, includes a total renovation of approximately 11,000 square feet. The Children’s Room improvements include the creation of spaces for toddlers, preschoolers, and elementary-aged children. The newly created Teen’s Space will accommodate different types of use and will include study rooms and a recording studio. There are a total of four new restrooms to be constructed; two adult restrooms that will serve the Auditorium and general areas and two-family restrooms, which will serve the Children’s Room.
Item Type: Consent Calendar
Approved forJanuary 24, 2023 Calendar
23 of 153
2 4c
COUNCIL PRIORITIES
N/A
RECOMMENDATION
That the City Council adopt the plans and specifications for the Central Library Children and Youth Services Renovation Project and authorize the City Manager to amend the existing Contract with Johnson Favaro to increase the amount by $238,420, for a total not-to-exceed $562,420.
BACKGROUND
The 92,600 square foot Central Library opened March 13, 1973 on the former site of Glendale Union High School and Glendale College; the iconic Brutalist building was designed by renowned architect Marvin Taff of Welton Becket and Associates. An extensive remodel in 1992 enlarged the Children’s Room, expanded the Special Collections Room to include local history material, and added a Computer Training Room.
In 2017, Central Library re-opened after an extensive renovation, which won a Conservancy Preservation Award from the Los Angeles Conservancy. Highlights of the renovation included the addition of a MakerSpace, the ReflectSpace Gallery, six new meeting rooms, an upgraded auditorium, and a relocated main entrance to the north side of the building, better connecting the library to Glendale’s vibrant downtown. Less visible, but still critical improvements included seismic retrofits, a new HVAC, Electrical and Mechanical plant, ADA upgrades, improvements to networking and power infrastructure and a new elevator. The renovation resulted in a beautiful, more usable space that provides improved public access to information and technology, a vibrant community gathering place, and spaces for work and study, creation and collaboration.
While the 2017 renovation created a beloved, vibrant community space, additional funding was not available to create that same environment for teens and children. The current design has addressed all of the needs for the teen and children’s spaces such as the improved usability and modernization work the rest of the building previously received.
Teens, children, and their families make up a large and growing portion of Glendale Library users, and the spaces need to support them at every stage of life. The Central Library Children’s Room is always busy with the Preschool Play Area being filled with parents and children. Teens currently have an area in the library that houses teen collections, but there are few seats in that space, and they are rarely used by teens. Teens make use of every area of the library, and sometimes their use interferes with patrons who are looking for a quiet space to work. Glendale teens rely on the library as a safe space after school, and these active, engaged library users need designated spaces for them to study, socialize, create, explore, and learn.
The 2017 renovation eliminated the second-floor adult restrooms. The only existing public restrooms on the second floor of the library are the “Girls” and “Boys” restrooms which 24 of 153
3 4c
are accessible only from the Children’s Room, which creates problems for adults renting the auditorium space, or using collections and meeting rooms. Two family restrooms in the Children’s Room and adult restrooms supporting the auditorium will be built.
To address these needs, Library, Arts & Culture and Public Works solicited an RFP for Architectural/Engineering, Interior Design, and Construction Administration services. On March 9, 2021, City Council approved a Professional Services Agreement with Johnson Favaro in a total not-to-exceed amount of $324,000. Staff from Library, Arts & Culture and Public Works departments worked collaboratively with Johnson Favaro through the design development phase of the project, collected enthusiastic community input, and adjusted plans accordingly. On December 7, 2021, Johnson Favaro presented conceptual design plans to City Council and incorporated feedback accordingly. Because of the uncertainty of the nature of the final design, Staff had initially removed the Construction Administration portion of their proposal at the time of award. Now that the plans are complete, Staff recommends Council authorize an amendment to Contract No. 8001171 with Johnson Favaro, increasing the amount by $238,420, for a total not-to-exceed amount of $562,420. With the additional funding, Johnson Favaro will provide Construction Administration services. These services include assistance with bids received, review and approval of submittals, and responding to Request for Information (RFIs) during the bid process and construction.
The Budget Act of 2021 created the Building Forward grant program by allocating $439 million in one-time funds to the California State Library to address life-safety and critical maintenance needs of public library facilities throughout California, prioritized for lower income areas. LAC submitted an application for Building Forward in March 2022 and was recently awarded $5,670,328, which Council has accepted. 25 of 153
4 4c
STAKEHOLDERS/OUTREACH
The Public Works Department staff will work with Library, Arts & Culture staff to minimize the disruption this construction will cause to Central Library operations.
Staff and the architect have held multiple meetings with the community and City Council. During these meetings Council’s and community’s feedback were incorporated into the design.
FISCAL IMPACT
The Central Library Children and Youth Services Renovation Project will cost approximately $6,000,000, which was approved as a part of the FY 2022-23 Budget.
This scope of work does not include additional grant-funded work for Central Library, such as the roof replacement, solar panels and air handler, etc. No new appropriation is being requested at this time. The City Council approved funding is outlined below.
Existing Appropriation
Amount Account String Funding Source
$2,500,000 GL: 51200-4011-LAC-0020-P0000
PL: LAC00942DN
Measure S CIP Fund
$5,670,328 GL: 51200-2750-LAC-0020-P0000
PL: LAC00942AG
Library Fund
ENVIRONMENTAL REVIEW
This project is Categorically Exempt under Class 31 (Historical Resource Restoration/ Rehabilitation) exemption pursuant to the California Code of Regulations, Title 14, Section 15331, which provides: “Class 31 consists of projects limited to maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent with the Secretary of the Interior’s standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings (1995), Weeks and Grimmer.”
CAMPAIGN DISCLOSURE
In accordance with the City Campaign Finance Ordinance, the following are the names and business addresses of the members of the board of directors, the chairperson, CEO, COO, CFO, Subcontractors and any person or entity with 10% interest or more in the firm proposed for contract in this Agenda Item Report:
Full Name Title Business Address City State Zip
26 of 153
5 4c
Jim Favaro Principal 5898 Blackwelder Street Culver City CA 90232 Steve Johnson Principal 5898 Blackwelder Street Culver City CA 90232
ALTERNATIVES
Alternative 1: Approve the Resolution adopting Plans and Specifications for Central Library Children and Youth Services Renovation Project and direct the City Clerk to advertise for bids and approve the Motion authorizing the City Manager to execute an amendment to the agreement with Johnson Favaro, to increase the amount by $238,420, for a total not-to-exceed amount of $562,420.
Alternative 2: Don’t approve the Resolution or Motion, which would defer the identified improvements within this report, at the Central Library Children and Youth Services Renovation Project.
Alternative 3: Consider any other alternative nor proposed by staff.
ADMINISTRATIVE ACTION
Prepared by:
Arthur Asaturyan, Project Manager
Approved by:
Roubik R. Golanian, P.E., City Manager
EXHIBITS / ATTACHMENTS
None
27 of 153
RESOLUTION NO. __________
A RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA ADOPTING THE PLANS AND SPECIFICATIONS NO. 3888 FOR THE
CENTRAL LIBRARY CHILDREN AND YOUTH SERVICES RENOVATION PROJECT AND DIRECTING THE CITY CLERK TO ADVERTISE FOR BIDS.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:
SECTION 1.The Specifications on file in the City Clerk’s office for the Central Library Children and Youth Services Renovation Project including the various documents incorporated therein, are hereby approved, adopted, designated, and shall hereafter be known as Plans and Specifications No. 3888.
SECTION 2.The City Clerk is hereby directed to advertise for bids for the work, equipment and materials described in this Specifications adopted by this Resolution.
Adopted this _____ day of ____________, 2023.
____________________________
Mayor, City of Glendale
ATTEST:
__________________________
City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES )
CITY OF GLENDALE )
I, Suzie Abajian, City Clerk of the City of Glendale, certify that the foregoing Resolution No. _____________ was Adopted by the Council of the City of Glendale, California, at a regular meeting held on the _____ day of _________________, 2023, the same was adopted by the following vote:
Ayes:
Noes:
Absent:
Abstain: _________________
City Clerk
28 of 153
7 7
3 8
MOTION
Moved by Council Member _______________________________________, seconded by Council Member _______________________________________, that the City Manager or a designee is authorized to execute an amendment – subject to approval by the City Attorney – to Professional Services Agreement No. 8001171 with Johnson Favaro to include Construction Administration services and increase the contract amount by two hundred thirty-eight thousand four hundred twenty dollars ($238,420), for a total not-to-exceed amount of five hundred sixty-two thousand four hundred twenty dollars ($562,420).
Vote as follows:
Ayes:
Noes:
Absent:
Abstain:
29 of 153
8a
CITY OF GLENDALE, CALIFORNIA
REPORT TO THE CITY COUNCIL
AGENDA ITEM
Report: California Energy Commission’s California Automated Permit Processing (CalAPP) Program grant in the amount of $80,000 to support Glendale's incorporation of SolarAPP+ into the Land Management System
1. Motion authorizing the Director of Community Development or designee to execute Grant Agreement with the California Energy Commission for the California Automated Permit Processing (CalAPP) Program in the amount of $80,000.
2. Resolution of Appropriation in the amount of $80,000.
COUNCIL ACTION
Item Type: Action Item
Approved for January 24, 2023 calendar
EXECUTIVE SUMMARY
The Building & Safety Division of the Community Development Department applied for and was recommended for approval to the California Energy Commission for the California Automated Permit Processing (CalAPP) Program in the amount of $80,000.
The grant is intended to assist jurisdictions with establishing online, automated solar permitting.
30 of 153
28a
3 8
8 4
COUNCIL PRIORITIES
Environmental Stewardship: By streamlining the solar application process, the City will further its goal of incentivizing an increase in the generation and use of renewable (solar) energy within the City.
RECOMMENDATION
Authorize the Director of Community Development or designee to execute the agreement with the California Energy Commission for the California Automated Permit Processing (CalAPP) Program, and accept and appropriate the grant funding.
BACKGROUND
California Automated Permit Processing Program – CalAPP was established with the passage of Senate Bill 129 to support a grant program for California cities and counties to establish automated, online solar permitting. Glendale’s population entitles it to $80,000 to be utilized, not only for the integration software, but also, for training events for staff and local installers, maintenance costs, subscription costs for the software database that supports the newly adopted platform, and staff time.
ANALYSIS
To meet its clean energy goals, California needs new renewable and storage resources, including rooftop solar and storage projects. Per the 2021 Senate Bill 100 Joint Agency Report, achieving 100% clean electricity in California requires an acceleration of the development of rooftop solar projects. CalAPP funding is intended to encourage cities and counties to further enhance permitting processes and accelerate processing and turnaround time, particularly regarding plan review. Overall, funding is intended to promote the development of residential solar and solar-plus-storage systems, greatly decreasing approval times, cutting permitting costs for local governments and homeowners, and helping California meet its greenhouse gas emission reduction goals through an easier installation process. As state law prohibits enforcement of items not related to health and safety, such as aesthetic requirements, the review of the application to install a solar energy system is limited to the Building Official’s review of whether it meets all health and safety requirements of local, state, and federal law.
Allowable Costs include:
• Ongoing staff labor costs associated directly with the adoption, and maintenance of a qualifying online, automated permitting platform, including:
oIn-house staff time, including IT resources
oThird-party consultation services
oOngoing, in-house staff time spent on staff training specific to the platform. • Ongoing costs associated with training installers, developers, and other external parties in the use of the system.
• Essential hardware or equipment necessary to support the adoption of a qualifying platform.
• Three years of maintenance and subscription costs for permit tracking software in support of the adopted permitting platform. 31 of 153
38a
3 8
8 4
Cities are mandated to have integration of an automated, online solar permitting system launched by September 2023. This funding will be utilized to ensure Glendale meets this deadline.
STAKEHOLDERS/OUTREACH
No additional outreach is proposed regarding acceptance of this grant. However, once SolarApp+ is integrated, outreach will be conducted to businesses and residents and training will be offered to installers.
FISCAL IMPACT
The CalApp Grant was not included as part of the FY 2022-23 budget. The grant amount totals $80,000 and will help cover the cost of integrating SolarApp+ for online and automatic solar permitting. Staff requests an appropriation of $80,000 from grant revenue, which will be reimbursed upon grant agreement execution and reimbursement submissions. Reimbursement requests may be submitted quarterly through June 30, 2027. The appropriation request is outlined below:
Requesting Appropriation
Amount From (Account
String)
To (Account
String)
Funding Source
$80,000 32610-2160-CDD-
0020-P0000-
CDD00944AG
43110-2160-CDD-
0020-P0000-
CDD00944AG
Grant Fund
ENVIRONMENTAL REVIEW (CEQA/NEPA)
The activity/action to authorize acceptance and appropriation of grant funds to support the implementation of SolarApp+ is not a project under California Public Resources Code Section 21065 because it will not cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and therefore, is not subject to the California Environmental Quality Act (CEQA) review.
Moreover, the action/activity is exempt from further review under CEQA in that, if a project, it is not one which has the potential for causing a significant effect on the environment under Title 14 of the California Code of Regulations, Section 15061(b)(3).
CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.
ALTERNATIVES
Alternative 1: Adopt the motion authorizing the Director of Community Development, or designee, to execute a Grant Agreement with the CEC in the amount of $80,000, and the appropriation to the grant fund. This will provide funding for training, education, and hardware and software costs of integrating SolarApp+ into the Land Management System.
32 of 153
48a
3 8
8 4
Alternative 2: Do not adopt the motion authorizing the Director of Community Development, or designee, to execute Grant Agreement with the CEC, and the appropriation of $80,000 to the grant fund. This will result in the General Fund having to absorb the costs of integration of SolarApp+ into the Land Management System.
Alternative 3: Consider any other alternative not proposed by staff.
ADMINISTRATIVE ACTION
Prepared by:
Tamar Sadd, Principal Administrative Officer
Approved by:
Roubik R. Golanian, P.E., City Manager
EXHIBITS/ATTACHMENTS
None.
33 of 153
MOTION
Moved by Council Member , seconded by Council Member , that the Council of the City of Glendale hereby authorizes the Director of Community Development, or a designee, to accept a grant award/grant funding from the California Energy Commission for the California Automated Permit Processing (CalAPP) Program in the amount of $80,000 on behalf of the City of Glendale, as further described in the Report dated January 24, 2023, and to execute all forms, agreements, amendments, certifications, and any other documents necessary to apply for and/or accept and receive such funding.
Vote as Follows:
Ayes:
Noes:
Absent:
Abstain:
34 of 153
35 of 153
8b
CITY OF GLENDALE, CALIFORNIA
REPORT TO THE CITY COUNCIL
AGENDA ITEM
Report: Scholl Canyon Landfill Biogas Renewable Generation Project.
1. Resolution dispensing with competitive bidding and authorizing the City Manager, or his designee, to issue a Full Notice To Proceed (FNTP) to Western Energy Systems, a division of Pen Power Group, LLC (WES) for the sale of Power Island Major Equipment (PIME) and services for the Biogas Renewable Generation Project and authorizing the execution of Amendment No. 1 with WES’ existing contract with the City relating to the PIME, in the not-to-exceed amount of $19,364,855 plus a Ten percent (10%) contingency in the amount of $1,936,486.
2. Motion authorizing the City Manager, or his designee, to enter into an Engineer-Procure-Construct (EPC) Contract with ACCO Engineered Systems Inc. (ACCO) for the engineering, design and construction of the Biogas Renewable Generation Project at the Scholl Canyon Landfill, in the not-to-exceed amount of $45,800,200, plus a Ten percent (10%) contingency in the amount of $4,580,020.
3. Motion authorizing the City Manager, or his designee, to execute an Amendment to Professional Services Agreement (PSA)No. 8000053 with Stantec Consulting Services, Inc. (Stantec) to increase the contract amount by $235,000 to provide supplemental professional environmental services for the Scholl Canyon Biogas Renewable Generation Project, for a new contract not to exceed amount of $1,668,582
4. Motion authorizing the City Manager, or his designee, to execute a Line Extension Contract with the Southern California Gas Company (SoCalGas), in an amount no to exceed $100,000, for construction of natural gas piping and a meter set assembly related to the Biogas Renewable Generation Project.
5. Motion authorizing the City Manager, or his designee, to execute an amendment to the existing Professional Services Agreement (PSA) No. 8001391 with Worley Group, Inc. (Worley) to add the sum of $1,100,000 for Owner’s Engineering and Project management services related to the Biogas Renewable Generation Project, for a new contract not to exceed amount of $2,000,000.
6. Resolution of appropriation.
36 of 153
28b
3 0
2 9
COUNCIL ACTION
Item Type: Action Item
Approved for January 24, 2023 calendar
EXECUTIVE SUMMARY
On November 30, 2021, the City Council certified the Environmental Impact Report (EIR) for the Scholl Canyon Landfill Biogas Renewable Generation Project (Biogas Project) and approved the Conditional Use Permit (CUP) and Special Recreation (SR) Permit.
On September 20, 2022, the City Council directed Glendale Water & Power (GWP) staff to complete additional tasks relating to the Biogas Project, each of which are discussed in this Report, and return to City Council with a further report on same.
GWP staff now recommends that the City Council dispense with competitive bidding and issue the Full Notice to Proceed (FNTP) for the second and final phase of the Biogas Project, authorize the execution of Amendment No. 1 with WES, and authorize an Engineer-Procure-Construct contract for the engineering, design and construction of the Biogas Project, as well as adopting a resolution appropriating funds to cover the cost of developing Biogas Project and Owner’s Engineering Services.
It is also recommended that the City Council authorize a Line Extension Contract with the SoCalGas, in an amount not to exceed $100,000, for construction of natural gas piping and a meter set assembly related to the Biogas Project.
GWP staff also recommends that the City Council authorize an amendment to the City’s existing PSA with Stantec Consulting Services, Inc. (Stantec) to increase the contract amount by $235,000 in order for Stantec to provide pre-construction mitigation measure compliance services for the Biogas Project, as well as an amendment to the City’s existing PSA with Worley to increase the contract amount by $1,100,000 to provide Owner’s Engineering, Project management services for the duration of the construction and commissioning of the Biogas Project.
COUNCIL PRIORITIES
Infrastructure: This project will install four gas engine generators, along with landfill gas cleanup system with the purpose of capturing and combusting the existing landfill gas (LFG) and capitalizing on this renewable energy by-product from such combustion for beneficial public use as a renewable energy resource.
Environmental Stewardship: Currently, the LFG generated by the decomposition of fill materials in the Scholl Canyon landfill is collected, compressed to remove liquids and combusted in an existing flaring system. The project will initially generate 12 megawatts of non-intermittent, locally generated electricity that is enough to power over 11,000 37 of 153
38b
3 0
2 9
homes using renewable energy.
RECOMMENDATION
Approve and issue the FNTP for the Biogas Project and authorize the City Manager to execute Amendment No. 1 to Contract with WES to provide for the remaining engineering design, fabrication, delivery and installation of the Power Island Major Equipment (PIME) to the site, as well as technical oversight and training for City staff.
Staff also recommends that the City Manager enter into an Engineer-Procure-Construct (EPC) Contract with ACCO for the engineering, design, construction, and commissioning of the Biogas Project.
Authorize a Line Extension Contract with the SoCalGas, in the amount of $100,000, for construction of natural gas piping and a meter set assembly related to the Biogas Project.
Also authorize an amendment to the City’s existing PSA with Stantec Consulting Services, Inc. (Stantec) to increase the contract amount by $235,000 to provide supplemental professional environmental services, as well as an amendment to the City’s existing PSA with Worley to increase the contract amount by $1,100,000 to provide Owner’s Engineering and Project Management services for the duration of construction and commissioning of the Biogas project.
BACKGROUND
Pursuant to a Request For Proposals (“RFP”) process and evaluation of proposals which was conducted in 2016 by GWP, on June 13, 2017 the City Council, by Resolution No. 17-68, issued a Limited Notice to Proceed (“LNTP”) authorizing the City Manager to execute a contract with WES for the engineering support, and detailed specifications and data regarding the PIME for the Biogas Project in order for the City to apply for permits, undertake California Environmental Quality Act (“CEQA”) reviews and information for the preparation of the Request for Proposal (“RFP”) for the EPC contractor for the Biogas Project.
Additionally, on June 13, 2017, the City Council, by Resolution 17-69, authorized GWP to issue the Request for Qualification (RFQ), and subsequently the Request for Proposals (RFP) utilizing the City’s Alternative Delivery Method to secure an EPC contractor to thereafter return to the City Council for consideration of the issuance of a contract.
On November 30, 2021, the City Council certified the EIR for the Biogas Project and approved the CUP and the SR Permit. The next necessary steps, in order to proceed with the Biogas Project, would be the issuance of the FNTP to WES, the PIME supplier and the award of the EPC contract. Each one of these items is discussed below.
In January 2022, GWP’s Owner’s Engineer for the Biogas Project, Worley undertook the RFQ and the subsequent RFP process to identify the most overall qualified EPC contractor in terms of price and technical competence. The process that was followed from January 2022 to present is as follows:
38 of 153
48b
3 0
2 9
•December 17, 2021 - January 21, 2022: Worley was hired to be the new Owners Engineer for the Scholl Biogas project.
•January 21, 2022 - February 4: Worley revised the RFP documents as necessary and sent invitations to the three 2017 prequalified EPC companies to submit proposals for the RFP.
•February 17: GWP is notified that all three EPCs elected to not submit proposals in response to the RFP, all for different reasons.
•February 23: GWP decided to issue a new RFQ followed by a new RFP phase.
RFQ submittal deadline was set for April 1, 2022.
•April 15: All RFQ respondents are approved to move to the RFP stage (ACCO, ARB Inc. (ARB), and SCS Energy).
•April 19: The RFP issuance pushed to May 9 that consequently pushed RFP due date to July 1.
•June 15: ARB schedule extension request of two weeks is approved; RFP due date pushed to July 15.
•July 12: ARB another schedule extension request of two weeks is approved; RFP due date pushed to July 29.
•August 19: Worley completed the evaluations of the two proposals received from ACCO and ARB.
•September 20: City Council directed a pause on the approval of the Biogas Project contracts and directed staff to return with a report regarding 1) cost benefit analysis of the project including the energy content of the Project; 2) methane gas clean-up; 3) the communication of a robust fire plan to the community; 4) the status of plans to develop solar and storage on City sites; 5) demonstration of firm assurance that the proposed Project will not be converted into an all-natural gas plan; and 6) community meetings relating to the Project.
Each of these items are discussed below.
In addition to the actions taken per Council’s direction on September 20, 2022, Worley has also worked with GWP and WES to have all the contract documents amended to allow GWP to issue the FNTP to WES for engine procurement, pending City Council approval of the project. WES has committed to firm pricing through February 24, 2023, pending that they get the FNTP prior to that date.
As discussed in more detail below, the City has been working with the South Coast Air Quality Management District (“SCAQMD”) since June 2017 on the submittal of the application for the required SCAQMD permit.
ANALYSIS
The City serves its system load through a combination of renewable energy sources comprised of local and imports, non-renewable imports, and local-generation. Between 1996 and 2017, the City was primarily burning the landfill gas from the Scholl Canyon Landfill in steam boilers located at the Grayson Power Plant via a 5.5-mile long underground dedicated pipeline. In 2018, based on SCAQMD directives, the City discontinued burning landfill gas in the Grayson boilers. Since then, the landfill gas has been burning in the existing flaring system at the Scholl Canyon Landfill that is operated 39 of 153
58b
3 0
2 9
by the Los Angeles County Sanitation District.
To ensure the most optimal use of the existing landfill gas, as well as to provide a reliable renewable energy resource, the City proposes to install four Jenbacher Gas Engine Generators, with the applicable landfill gas cleanup system, on a 2.2-acre site at the Scholl Canyon Landfill. Given that Scholl Canyon Landfill gas composition and degradation is site specific, GWP hired an independent consulting firm, SCS Engineers, to model future gas production and degradation at the landfill and to assess the condition of the landfill after its closure. Per SCS Engineers modeling, there will be sufficient gas production to run the proposed four engines until 2034, and three engines until 2042. During this time, the Biogas Project will generate approximately 12MW-
10.5MW (four engines) and 9MW-7.7MW (three engines) of gross renewable power.
After 2042 there will be only two engines running and generating an estimated 6MW of gross power.
Status of the WES Contract and the FNTP:
In 2018 WES’ price for the FNTP was $13,928,938. Although, five years have gone by and the cost has increased due to significant inflation rate, staff managed to negotiate a price of $17,629,194 with WES which was valid until September 23, 2022. Due to continued price increases through fourth quarter of 2022, the cost of the project now has increased to $19,364,855. The price comprises of $17,417,623 for the original scope of work, $475,021 for Performance and Payment Bonds as well as an additional sum of $1,472,211 for added scope of work that includes a natural gas compressor due to the low pressure of the SoCal Gas system and for shipping requirements, WES has to subcontract out certain EPC mechanical and electrical services in order to reassemble/assemble the engine-generator modules before turning them over to the City. The modules cannot be delivered to site as a whole, i.e., a complete engine- generator package, due to shipping constraints.
The City’s Charter, Article VI, Section 9, allows City Council to dispense with competitive bidding where the City Council determines that dispensing with competitive bidding is in the best interests of the City. As noted above, WES was selected in 2017, through a RFP process held in 2016, as the best value proposer to the City. The RFP process allows the consideration of other factors serving the best interests of the City, rather than a mandatory award to the lowest proposer, when making an award. Since WES has completed the LNTP phase of the Project and has engineered the Project equipment, in order to ensure continuity of service relating to same upon the purchase of the Project equipment, staff is recommending and requesting that the City Council dispense with competitive bidding and issue the FNTP to WES, and to also authorize an amendment to WES’s existing contract with the City to manufacture, supply and oversee the installation of, PIME.
The RFP Process for the EPC Contract:
To ensure that the public had an opportunity to participate in the Biogas project, the RFQ for the Project was reissued on March 4, 2022. Three qualified EPC firms responded to the RFQ, and all were selected to proceed to the RFP stage. After 40 of 153
68b
3 0
2 9
amending the RFP documents from their 2017 versions, the RFP was issued to the three qualified firms on May 9, 2022, with a proposal due date of July 29, 2022.
The City received three responses to the RFP. Two were formal proposals, which are discussed in more detail below: one from ARB Inc., in the amount of $70,909,700, and another from ACCO Engineered Systems, Inc., in the amount of $43,637,098. Now (As of January 12, 2023) increased to $45,800,200 (5% increase) to cover the escalation associated with the revised schedule for labor, equipment, subcontractors and general conditions. GWP lowered the previously requested contingency of 15% down to 10% to absorb portion of the price increase.
The third response was from SCS Energy, which declined to submit a formal proposal due to business reasons but informally stated that had a proposal been submitted, their budgetary price would have been $55,800,000.
Upon review of the proposal documents and after considering all of the required metrics of evaluation, GWP recommends that ACCO be awarded this EPC contract. At this time, this request for approval is to authorize WES and ACCO to begin work on the project with notices to proceed.
Stantec’s Supplemental Professional Environmental Services:
Due to the technical expertise needed, GWP requests that Stantec continue providing services necessary for the acceptance and success of the Biogas Project. As part of these services, Stantec will be preparing a Worker Environmental Awareness Program, conducting pre-construction surveys on wildlife and vegetation, prepare a Habitat Mitigation and Monitoring Plan, prepare an application for a Lake and Streambed Alteration Agreement, advancing air permitting requirement for the project, and any additional support GWP may request.
Worley’s Services:
As GWP Owner’s Engineer to manage review and monitor project design plus engineering, equipment procurement supervision, construction conformance with drawings and specifications, project commissioning and witness plus approve performance testing.
Southern California Gas Company Line Extension Contract:
As part of the Biogas Project, SoCalGas will need to extend their distribution system and install a meter to serve the Biogas Project. This work includes the construction of gas service piping and a meter set assembly (meter), and if required, the extension of gas main piping. The Engineer’s cost estimate for this work is $100,000 and is included in miscellaneous project costs.
Further Actions Taken Pursuant to City Council’s Direction on September 20, 2022:
1. Cost-Benefit Analysis: Please see below for a comparison of the Biogas Project with other hypothetical projects:
41 of 153
78b
3 0
2 9
Scholl Canyon
Biogas Renewable
Generation
Local Solar +
Battery Storage
Wartsila Engine at
Grayson
Renewable PPA
Cost Estimate:
$123M
($80.36 per MWH)
Cost Estimate:
$248M
($162.15 per MWH)
Cost Estimate:
$149M
($97.15 per MWH)
Cost Estimate:
$145M
($90.05 per MWH)
•≈11MW
24/7/365 for 10
years and
≈6MW after 20
years (minus
periodic
maintenance)
•Local
generation not
depending on
transmission
•9% City’s
renewable
obligation
•Beneficially
using LFG
instead of
flaring
•Includes $
2.5M/yr. O&M
– for 20 yrs.
•≈ 262 MWh
Battery Energy
Storage
System (with
≈66MW/4-hour
BESS)
•44MW Utility-
Scale Solar PV
Generation
•Cost of land,
BESS
augmentation,
and O&M
excluded from
estimate
•Land footprint
of about 250
acres
•Not depending
on transmission
•Assumes 1
Wartsila engine
to match Scholl
use-case
(Baseload).
24/7/365
operation (minus
periodic
maintenance)
•Not depending
on transmission
•This project
would result in
higher net
emissions by
having two
emission
projects instead
of one (Natural
Gas @ Grayson
and Flaring @
Scholl).
•Non-Fuel O&M is
estimated to be
$460K/yr
•Power
Purchase
Agreement +
Losses +
Transmission
Cost over 20
years.
•The city does
not own the
asset
•Relies on
availability of
transmission
(non-existent)
2. Methane Gas Clean-Up:
The landfill gas (LFG) cleanup system proposed by the EPC contractor, ACCO, is designed and manufactured by Willexa Energy. It includes LFG compression via blowers, sulfur removal by a sulfur reduction media, dehydration via a chiller system, and siloxane removal by a regenerative catalyst system.The LFG degradation data was developed by SCS Engineers from Scholl historical and present data plus informed assumptions for the future. SCS’s LFG model was used to calculate the LFG output or recovery potential over time. The model uses USEPA data plus SCS’s data to calculate the LFG recovery potential over time.
SCS uses the historical data from Scholl and a database of over 1200 years of 42 of 153
88b
3 0
2 9
LFG flow and methane data from 253 landfills with operational LFG collection systems.
3. Communication of a Robust Fire Plan to the Community:
On December 14, 2022, the Glendale Fire Department held a community meeting where the City’s robust plan in the Glenoaks Canyon neighborhood was discussed. Some topics included the region’s fire history, evacuation and alerting steps and resources, and wildfire prevention such as the fire hazard severity zones, vegetation management laws, defensive space requirements, and home hardening. Residents were also informed of the wildfire response assets available to the residents from three different agencies: Glendale Fire, LA County Fire, and LA City Fire. The following mitigation measures are included in the project:
•Increasing the current brush clearance to allow for a minimum of 100ft clearance around all structures and buildings.
•Enclosing the engines which will contain the biogas within a structure (i.e. – no open flame exposure to the surrounding area).
•The structure will include a fire protection system that will activate at the first sign of a fire problem.
•The office buildings will include a fire sprinkler system. •The power distribution center will include a NFPA-compliant fire protection system.
•The 60,000-gallon water tank will have fire department connections and is solely available for fire suppression use.
•Fire extinguishers and fire suppression hoses will be throughout the facility.
•Fire alarms throughout the facility.
•Separation within the engine enclosure building which will isolate a fire danger and minimize its spreading from engine to engine
4. Status of Plans to Develop Solar and Storage on City Sites:
A number of City sites have been identified for carport, rooftop, and/or ground mount solar installations. GWP worked with Black & Veatch to develop technical specifications for each of the solar installation options as well as conceptual designs for the sites. Per City Manager’s direction, GWP is now working with one of Owner’s Engineers to further develop the City owned solar projects.
5. Demonstration of Firm Assurances that Project Will Not Be Converted to All-Natural Gas Plant:
The SCAQMD Permit is one of the (if not the) most important documents governing the scope and operation of the Biogas Project. The SCAQMD Permit specifically provides a limit/cap of 10% natural gas usage of the Biogas Project. 43 of 153
98b
3 0
2 9
Any levels exceeding this will be in violation of the SCAQMD Permit.
Additionally, operating the Biogas Project with natural gas levels exceeding the SCAQMD Permit will disqualify the Biogas Project as a renewable source.
Finally, the EIR also allows the use of natural gas at a maximum of 10%.
Therefore, any exceedance or modification would require a new EIR process, which the City Council will need to review and approve. Therefore, the operating permitting documents for the Biogas Project and the City Council are the firm assurances that the Project will not be converted to an all-natural gas plan
6. Community Meetings Relating to the Project:
The following community meetings relating to the Biogas Project were held in accordance with Council’s direction:
•November 10, 2022 – Site tour to Glenoaks Canyon Homeowners Association members of the landfill and biogas site
•November 16, 2022 – Meeting with Glenoaks Canyon Homeowners Association members
•November 30, 2022 – Open House held at the Civic Auditorium inviting the public to discuss and learn more about the Biogas Project. •December 7, 2022 – Site Tour of the Scholl Canyon Landfill and Project to the Glenoaks Canyon Homeowners Association members
•December 7, 2022 – Community meeting with the Community Services & Parks Department regarding possible future recreational uses of the closed landfill site.
•December 8, 2022 – Responding to questions that were asked during the November16, 2022 meeting with the Glenoaks Canyon Homeowner’s Association
•December 8, 2022 – Meeting with a few Glenoaks Canyon Homeowner’s Association members, to discuss future solar systems at the landfill and other sites in Glendale
•December 14, 2022 – Community meeting with the Fire Department regarding fire plan
•January 11, 2023 – Microsoft Teams meeting with representatives of Glenoaks Canyon Homeowners Association as the final wrap-up discussion.
AQMD Permit:
On August 24, 2022, the City received confirmation by the SCAQMD of its intent to issue the draft permit for the Biogas Project. On September 19th, 2022, AQMD issued a preliminary draft permit to construct and temporary permit to operate.
SCAQMD continues to prepare its final report to US EPA. Once that report is complete, SCAQMD will then submit it to EPA, release the draft permit to the public and initiate the public review process. SCAQMD's actions going forward are not dependent upon City Council actions but instead are dependent solely upon SCAQMD's determination that the project complies with all applicable regulations. In releasing its preliminary draft 44 of 153
108b
3 0
2 9
permit language to the City in September, SCAQMD has reaffirmed its concurrence that the project is in compliance with all applicable regulations and qualifies for permit.
Project Description: The proposed Biogas Renewable Generation Project will serve two major roles for the City:
•Provide the City a Renewable Portfolio Standard
resource.
•Provide an environmentally sound manner in
which to use the landfill gas from the Scholl
Canyon Landfill.
The proposed Biogas Renewable Generation Project, a
12 MW gross power plant, is to be located at
Glendale’s existing Scholl Canyon Landfill (Site). The
power plant will consist of four self-enclosed Jenbacher JGS 620 Reciprocating Engine Generators (REG), a
biogas and condensate treating facility, natural gas
pipeline, and electrical interconnection to Glendale
Water and Power’s (GWP) electrical distribution
system.
RFP Approved: May 5, 2022
Advertisement Method: Email to Pre-Qualified EPC vendors with SharePoint link to all pertinent documents.
RFP Issued: May 6, 2022
RFP Due Date: July 29, 2022
Company Name(s) and
Proposal Amount(s):
ACCO: $45,800,200
ARB: $70,909,700
Selection Criteria
(If SS, list applicable
Provision):
EPC Procurement
•Capital Cost – 45% (45 points)
•Proposers LFG and Condensate Cleanup
System Design – 25% (25 points)
•Conformance with Commercial and Agreement
Requirements; Proposed Schedule of Values –
10% (10 points)
•Conformance with Technical Requirements –
10% (10 points)
•Proposal Supplement and Presentation – 10%
(10 points)
•Value Engineering Alternatives (if any) – total
possible of 5 additional points.
Consultant(s): Stantec
Worley
45 of 153
118b
3 0
2 9
New / Existing
Consultant(s):
Existing
Procurement Method
(RFP / SS):
RFP
Contract Term:
Approximately 2 years from EPC FNTP to in-service
date.
Project Begins: March 2023
Project Ends: January 2025
Change Orders (When Applicable)
Company name: N/A
Original Approved
Contract Amount:
N/A
Approved Contingency: N/A
Change Order History: N/A
This Change Order
(Increase):
N/A
New Contract Total (If
Approved):
N/A
STAKEHOLDERS/OUTREACH
Extensive stakeholder outreach was conducted for the Biogas Project, the process of which was governed by the requirements of the applicable California Environmental Quality Act (CEQA) Guidelines. The City issued a Notice of Preparation of the Draft Environmental Impact Report (DEIR) for the Proposed Project on March 21, 20191. The CEQA-governed public outreach, as well as the City’s efforts for stakeholder outreach are summarized in this section.
The Project DEIR was circulated for public review and comment from July 1, 2020, through September 30, 2020 for an extended 90-day public comment period. Through the CEQA process, outreach was undertaken to the following stakeholders:
- Residents and business owners: through publication of notification of, and information relating to, the DEIR through the CEQA noticing process (e.g. publication through the county, city and state clearinghouse, through GWP’s social media platforms and through the City’s website, as well as noticed and agendized public hearings before the GWP Commission, Sustainability Commission, Planning Commission and the City Council.
- Surrounding jurisdictions and applicable authorities (such as, but not limited to, the City of Pasadena; City of Los Angeles; Los Angeles County; South Coast Air Quality Management District; Los Angeles Sanitation District; City of La Canada; 1 Prior to the issuance of the Notice of Preparation of the DEIR and the DEIR/FEIR process, the City issued public notice and conducted public hearings for the Mitigated Negative Declaration (MND) for the Biogas Project. At the direction of the City Council, the City proceeded with the much more comprehensive CEQA review via the DEIR/FEIR process.
46 of 153
128b
3 0
2 9
Caltrans; California Air Resources Board; State Water Resources Control Board; Department of Toxic Substances Control; and the California Department of Fish and Wildlife): by providing them written notification of the DEIR with an opportunity to submit comments, each of which were addressed thoroughly by the City.
In addition to the above, during months of November and December of 2022 a number of site tours and community meetings were held with Glenoaks Canyon Homeowners Association members and the general public.
FISCAL IMPACT
The total contractual cost for Biogas Renewable Generation Project is $73,116,561 based on the following cost breakdown:
•FNTP to WES and EPC: $65,165,055
•Total contingency of $6,516,506 at 10 percent for WES and EPC •Owner’s Engineer and miscellaneous project costs: $1,435,000 Of this amount, $26,207,685 was approved as a part of the FY 2022-23 budget. The remaining amount of $46,908,876 was not included, therefore staff is requesting for an appropriation of $46,908,876 from the Electric Surplus Fund Balance or Bond proceeds.
The existing appropriation and the requested appropriation is outlined below:
Existing Appropriation
Amount Account String Funding Source
$26,207,685 GL: 43110-5830-GWP-0020
PL: 31005
Electric Depreciation Fund
Requesting Appropriation
Amount From (Account
String)
To (Account String) Funding Source
$46,908,876 GL: 27900-5810-
GWP-0000
GL: 43110-5830-GWP-0020
PL: 31005
Net Position, Electric
Fund Balance and
Bond Proceeds
ENVIRONMENTAL REVIEW (CEQA/NEPA)
As required by the CEQA Guidelines (14 Cal Code Regs §15082(a)(1)), the City issued a Notice of Preparation of the Draft Environmental Impact Report (DEIR) for the Proposed Project on March 21, 2019. The Project DEIR was circulated for public review and comment from July 1, 2020, through September 30, 2020, for a 90-day period.
Numerous public comments were received and responses to each public comment were drafted and incorporated into the Final Environmental Impact Report (FEIR), which was prepared pursuant to the City of Glendale’s adopted Procedures for Preparation 47 of 153
138b
3 0
2 9
and Processing of Environmental Documents (Glendale CEQA Guidelines, 2016) and Public Resources Code §§21000 et seq., and the CEQA Guidelines (15 Cal Code Regs §15000 et. seq.). The FEIR was published on the City’s website on August 2, 2021. On November 30, 2021, the EIR was certified by the City Council.
In addition to the above synopsis, GWP has been working with Stantec to secure the proper permit with SCAQMD. SCAQMD has been cooperative with this process and, as a result, has provided the attached draft permit (see Exhibit 1).
CAMPAIGN DISCLOSURE
In accordance with the City Campaign Finance Ordinance No. 5744, the attachments to this Report contains the names and business addresses of the members of the board of directors, the chairperson, CEO, COO, CFO, Subcontractors and any person or entity with more than 10% interest or more in the company proposed for contract in this Agenda Item (see Exhibits 2, 3, 4 and 5).
ALTERNATIVES
Alternative 1: Authorize and approve the actions requested and recommended in this report to generate 12 to 6 megawatts of local renewable and reliable energy from landfill gas for over 20 years.
Alternative 2: Do not authorize or approve the actions requested and recommended in this report which will have the effect of the need to continue flaring the landfill gas 24/7 for many years with no beneficial use, as well as the cost to purchase replacement energy.
Alternative 3: Consider any other alternatives not proposed by staff.
ADMINISTRATIVE ACTION
Prepared by:
Daniel Scorza, Chief Assistant General Manager - Electric Approved by:
Roubik R. Golanian, P.E., City Manager
EXHIBITS/ATTACHMENTS
Exhibit 1: SCAQMD draft permit
Exhibit 2: Campaign Finance Disclosure for ACCO Engineered Systems, Inc.
Exhibit 3: Campaign Finance Disclosure for Western Energy Systems, a division of Pen Power Group, LLC
48 of 153
148b
3 0
2 9
Exhibit 4: Campaign Finance Disclosure for Stantec Consulting Services, Inc.
Exhibit 5: Campaign Finance Disclosure for Worley Group, Inc. 49 of 153
1 RESOLUTION NO. _______________
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA,
DISPENSING WITH COMPETITIVE BIDDING AND AUTHORIZING THE CITY MANAGER, OR
HIS DESIGNEE, TO ISSUE A FULL NOTICE TO PROCEED TO WESTERN ENERGY
SYSTEMS, A DIVISION OF PEN POWER GROUP, LLC (WES), FOR THE SALE OF POWER
ISLAND AND MAJOR EQUIPMENT (PIME) AND SERVICES FOR THE BIOGAS RENEWABLE
GENERATION PROJECT AND FURTHER AUTHORIZING THE EXECUTION OF AMENDMENT NO. 1 WITH WES’ EXISTING CONTRACT RELATING TO THE PIME
WHEREAS, the City of Glendale (City), through Glendale Water & Power Department (GWP) operates a municipal utility for the distribution of electrical energy to the citizens of the City; and
WHEREAS, in 2016 GWP issued a Request For Proposals (RFP) to identify the major equipment – the Power Island Major Equipment (PIME) - which the City would need for the proposed Biogas Renewable Generation Project (Project); and WHEREAS, on June 13, 2017, by Resolution 17-68, the City Council authorized the City Manager or his designee, to execute a contract with Western Energy Systems (WES) for the sale of power island major equipment and services for the Project and also authorized the issuance of a Limited Notice to Proceed (LNTP) for the first phase (of two phases) of the proposed Project during which WES provided engineering support and detailed specifications and data regarding the equipment as needed in order for the City to apply for permits, undertake California Environmental Quality Act (CEQA) reviews and information for the preparation of the Request for Proposals (RFP) for the Engineer, Procure, Construct (EPC) contractor for the proposed Project; and
WHEREAS, the second phase of the proposed Project is the Full Notice to Proceed (FNTP) to be issued by the Council to proceed with the proposed Project by which authorization will be granted to WES to manufacture, supply and oversee the installation of, and warrant the Power Island Major Equipment; and
WHEREAS, the LNTP phase of the proposed Project has been completed with the exception of certain tasks which will be moved to the FNTP phase, as has the required CEQA process via the issuance of a Notice of Preparation of the Draft Environmental Impact Report (DEIR) for the Proposed Project on March 21, 2019; the circulation of the Project DEIR for public review and comment from July 1, 2020, through September 30, 2020 for a 90-day period; receipt of numerous public comments were and responses to each public comment drafted and incorporated into the Final Environmental Impact Report (FEIR), which was prepared pursuant to the City’s adopted Procedures for Preparation and Processing of Environmental Documents (Glendale CEQA Guidelines, 2016) and Public Resources Code §§21000 et seq., and the CEQA Guidelines (15 Cal Code Regs §15000 et. seq.); and the FEIR being published on the City’s website on August 2, 2021; and
WHEREAS, on November 30, 2021, the City Council certified the Environmental Impact Report (EIR) for the Project and approved Conditional Use Permit No PCUP 2012782 and Special Recreation Review No. PSRZDR 2012781; and
WHEREAS, on September 20, 2022, the City Council directed GWP staff to complete additional tasks related to the Project, each of which are discussed in the Report dated January 24, 2023 (January 24, 2023 Report); and
50 of 153
2 WHEREAS, City’s Charter, Article VI, Section 9, allows City Council to dispense with competitive bidding where the City Council determines that dispensing with competitive bidding is in the best interests of the City; and
WHEREAS, WES was selected in 2017 through a RFP process held in 2016 as the best value proposer to the City; and
WHEREAS, since WES has completed the LNTP phase of the Project and given the foregoing recitals relating to WES’s integral involvement with the engineering of the Project equipment, as well as to ensure continuity of service relating to same upon the purchase of the Project equipment, staff is recommending and requesting that the City Council dispense with competitive bidding and issue the FNTP, as well as authorize an amendment to WES’s existing contract with the City to manufacture, supply and oversee the installation of the PIME; and WHEREAS, given the foregoing and the additional information regarding the Project provided in the January 24, 2023 Report by the General Manager of GWP, the City Council hereby authorizes the City Manager, or his designee, to issue the FNTP to proceed with the proposed Project by providing the necessary authorization for WES to manufacture, supply and oversee the installation of, and warrant the Power Island Major Equipment; and WHEREAS, in the June 2017 Resolution No. 17-68, the proposed FNTP price is listed at $14,151,366; however, that price was valid until 2018, and over the last four years, the market has been subject to changes and inflation which has affected the FNTP price and as such the FNTP price authorized by the City Council in this Resolution shall supersede and replace the FNTP price in Resolution 17-68; and
WHEREAS, since the execution of the contract with WES and the issuance of the LNTP in June 2017, an amendment to the contract with WES is necessary to amend and add tasks to WES’s scope of work as necessary for the implementation of the FNTP, the cost of which is included in the FNTP price authorized by the City Council via this Resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GLENDALE AS FOLLOWS:
SECTION 1. The foregoing facts are deemed to be true and correct and basis for dispensing with competitive bidding pursuant to City’s Charter, Article VI, Section 9, where the City Council determines that dispensing with competitive bidding is in the best interests of the City and that the City Council hereby dispenses with competitive bidding.
SECTION 3. The City Council hereby finds that the requirements of CEQA have been met for the Biogas Renewable Generation Project, as set forth in this Resolution and the January 24, 2023 Report by the General Manager of GWP, and authorizes the City Manager, or his designee, to issue the FNTP to Western Energy Systems, A Division of Penn Power Group, LLC (WES) to manufacture, supply and oversee the installation of, and warrant the Power Island Major Equipment (PIME) for the Biogas Renewable Generation Project, in the not to exceed amount of $19,364,855, plus a ten percent (10%) contingency in the amount of $1,936,486. The form of said FNTP shall be subject to the approval of the City Attorney.
SECTION 4. The City Council hereby authorizes the City Manager, or his designee, to enter into and execute Amendment No. 1 to the City’s contract with WES, Contract No. C106537, to amend the scope of work as necessary for the implementation of the FNTP. The form of said amendment shall be subject to the approval of the City Attorney. 51 of 153
3 SECTION 5. This Resolution shall take effect immediately upon its adoption.
Adopted this _____ day of _________________________, 2023.
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS.
CITY OF GLENDALE )
I, Suzie Abajian, PH.D., City Clerk of the City of Glendale, certify that the foregoing Resolution No. __________ was adopted by the Council of the City of Glendale, California, at a regular meeting thereof held on the _____ day of _______________, 2023, by the following vote:
Ayes:
Noes:
Absent:
Abstain:
City Clerk
52 of 153
M O T I O N
Moved by Council Member ________________________________, seconded by Council Member __________________________________, that the Council of the City of Glendale finds that that the Council of the City of Glendale, having previously by Resolution No. 17-69, authorized the General Manager of Glendale Water & Power Department (GWP) to issue a Request For Proposal (RFP) using the Engineer, Procure, Construct (EPC) project delivery method for the design, engineering and construction of the Biogas Renewable Generation Project, hereby accepts and approves the proposal of ACCO Engineered Systems, Inc. for the design, engineering and construction of the Biogas Renewable Generation Project (RFP No. 3649), as recommended by the Report dated January 24, 2023 by the General Manager of GWP, and authorizes the City Manager, or his designee, subject to approval by the City Attorney, to enter into an EPC contract with ACCO Engineered Systems, Inc. in the not- to-exceed amount of $45,800,200, plus a ten percent (10%) contingency in the amount of $4,580,020.
Vote as follows:
Ayes:
Noes:
Absent:
Abstain:
53 of 153
M O T I O N
Moved by Council Member ________________________________, seconded by Council Member __________________________________, that the Council of the City of Glendale hereby authorizes the City Manager or his designee to enter into an amendment to the City’s existing Professional Services Agreement (PSA), contract number 8000053, with Stantec Consulting Services, Inc. (Stantec), to add the sum of $235,000 to provide supplemental professional environmental services related to the Biogas Renewable Generation Project, for a new contract not to exceed amount of $1,668,582. The form of said amendment shall be subject to approval by the City Attorney.
Vote as follows:
Ayes:
Noes:
Absent:
Abstain:
54 of 153
M O T I O N
Moved by Council Member ________________________________, seconded by Council Member __________________________________, that the Council of the City hereby authorizes the City Manager, or his designee, to enter into and execute a Line Extension Contract with the Southern California Gas Company, in an amount not to exceed $100,000, for construction of natural gas piping and a meter set assembly related to the Biogas Renewable Generation Project. The form of said agreement shall be subject to the approval of the City Attorney.
Vote as follows:
Ayes:
Noes:
Absent:
Abstain:
55 of 153
M O T I O N
Moved by Council Member ________________________________, seconded by Council Member __________________________________, that the Council of the City of Glendale hereby authorizes the City Manager or his designee to enter into an amendment to the City’s existing Professional Services Agreement (PSA), contract number 8001391, with Worley Group, Inc. (Worley), to add the sum of $1,100,000 for Owner’s Engineering and Project Management services related to the Biogas Renewable Generation Project, for a new contract not to exceed amount of $2,000,000. The form of said amendment shall be subject to approval by the City Attorney.
Vote as follows:
Ayes:
Noes:
Absent:
Abstain:
56 of 153
3 2
1 0
RESOLUTION NO. ___________
RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALE
MAKING AN APPROPRIATION
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:
SECTION 1: That the sum of $47,076,071 is hereby appropriated and/or transferred from the following accounts to the following accounts:
ACCOUNTS DESCRIPTION FROM TO
27900-5810-GWP-0000-P0000-
T0000-F0000-0000-0000-
43110-5830-GWP-0020- P0000-
T0000-F0000-0000-0000-
31005
Net Position, Electric Surplus Fund,
Glendale Water & Power
Contractual Services, Electric Depreciation
Fund, Glendale Water & Power, Project,
PM Biogas Renewable Generation Proj
$47,076,071
$47,076,071
To appropriate funding for the Biogas Renewable Generation Project.
SECTION 2: The Director of Finance / Information Technology is authorized to make such other revisions, individual appropriation line-items, changes in summaries, fund totals, grand totals, and other portions of the budget document as necessary to reflect and implement the changes specified in this resolution.
SECTION 3: The City Clerk shall certify to the adoption of this Resolution.
Adopted this________day of _______________, 2023.
_______________________________
Mayor
ATTEST:
___________________________________
City Clerk 1/18/2023
47,076,071
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF GLENDALE )
I, Suzie Abajian, City Clerk of the City of Glendale, do hereby certify that the foregoing Resolution No._________was adopted by the Council of the City of Glendale, California, at a regular meeting held on the__________ day of _______________, 2023, and that the same was adopted by the following vote:
Ayes:
Noes:
Absent:
Abstain:
________________________________
City Clerk
Director of Finance / Information Technology
57 of 153
Section D Page 1
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
Facility Description and Equipment Specific Conditions
(Section D)
This section consists of a table listing all permitted equipment at the facility, facility wide requirements, all individual Permits to Operate and Permits to Construct/Operate issued to various equipment at the facility, and Rule 219-exempt equipment subject to source -specific requirements.
Each permit and Rule 219-exempt equipment will list operating conditions including periodic monitoring re quirements, and applicable emission limits and requirements tha t the equipment is subject to. Also included is the Rule origin and authority of each emission limit and permit condition.
EXHIBIT 1
58 of 153
Section D Page 2
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMITTED EQUIPMENT LIST
The following is a list of all Permits to Operate and Permits to Construct/Operate at this facility:
Application No. Permit No. Equipment Description Page No. 505048 G6898 Landfill Gas Condensate Collection, Treatment, and Storage System
5 505049 G7093 Landfill Gas Treating System 7
NOTE: Permits to Construct (if any) are listed in Section H of this facility permit. Any other applications that are still being processed and have not been issued Permits to Construct or Permits to Operate will not be found in this Title V Permit.
59 of 153
Section D Page 3
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
FACILITY WIDE CONDITION(S)
Condition(s):
1. Except for open abrasive blasting operations, the operator shall not discharge into the atmosphere from any single source of emissions whatsoever any air contaminant for a period or periods aggregating more than three minutes in any one hour which is:
A. As dark or darker in shade as that designated no. 1 on the Ringlemann chart, as published by the United States Bureau of Mines; or
B. Of such opacity as to obscure an observer’s view to a degree equal to or greater than does smoke described in subparagraph (A) of this condition.
[Rule 401]
2. The operator shall monitor, at least on a monthly basis, total sulfur compounds ca lculated as hydrogen sulfide burned in gaseous fuels other than natural gas. All monitoring results shall be kept and maintained for at least five years and made available to South Coast AQMD personnel upon request. This facility shall not emit total sulfur compounds equal to or greater than 5 pounds per day, calculated as hydrogen sulfide from the combustion of gaseous fuels other than natural gas. If the 5 pounds per day total sulfur compounds calculated as hydrogen sulfide limit is reached or exceeded, then the operator shall conduct the following pursuant to Rule 431.1:
A. The operator shall not burn sewage digester gas containing sulfur compounds in excess of 40 ppmv calculated as hydrogen sulfide averaged daily, or 40 ppmv and 500 ppmv with an averaging period of monthly and 15 minutes, respectively;
B. The operator shall not burn other (non-natural gas) gases containing sulfur compounds in excess of 40 ppmv calculated as hydrogen sulfide with an averaging period of 4 hours; and C. The operator shall monitor the total sulfur compounds calculated as hydrogen sulfide burned in gaseous fuels pursuant to Rule 431.1(d) and follow the recordkeeping and reporting requirements pursuant to Rule 431.1(e).
[Rule 204, Rule 431.1]
3. The operator shall not use fuel oil containing sulfur compounds in excess of 15 ppm by weight as supplied by the supplier.
[Rule 431.2]
4. The owner or operator shall comply with all applicable contents of the addendum, mitigation measures stipulated in the statement of findings and statement of overriding considerations which are part of the certified Facilities Master Plans Program Environmental Impact Report (FMP PEIR). [Rule 204]
5. Continuous operation of monitorin g systems not subject to Rule 218, Rule 218.1, Rule 218.2, or Rule 218.3 are not required when the associated basic equipment is not in operation, or when necessary calibration, maintenance or repair activities are performed in accordance with manufacturer s recommendation. The operator shall take all reasonable actions to minimize the time required to perform such activities. In no event shall any such activities exceed 96 consecutive hours for any one calibration, maintenance, or repair episode. The operat or shall notify the South Coast AQMD within twenty-four (24) hours of the start of a calibration, maintenance or repair activity, if the activity is expected to last more than 24 consecutive hours. [Rule 204]
6. The operator shall synchronize all recorders with respect to the time of day. [Rule 204]
60 of 153
Section D Page 4
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
7. The hydrogen sulfide (H2S) concentration at the downwind property fence line boundary shall not exceed 0.03 ppmv as determined in accordance with state ambient air quality standards (AAQS) averaging times, or any revised AAQS which may become effective during the operation of the facility. [Rule 204, Rule 402]
61 of 153
Section D Page 5
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO OPERATE
Permit No. G6898
A/N 505048
Equipment Description:
Landfill Gas Condensate Collection, Treatment, and Storage Collection Consisting of:
1. Oil/Solids Separator, 750 Gallon Capacity, 10 gpm with FLOC System.
2. Oil Discharge Tank, 1,110 Gallon Capacity,
3. Three (3) Influent Tanks, Condensate, Each 7’-11” Dia. X 10’-10” H., 4,000 Gallon Capacity.
4. Eight (8) Tanks, Aquaserv, Miscellaneous Chemical Additives, 105 to 165 Gallon Capacity wit h Associated Feed Pumps.
5. Dissolve Air Floatation (DAF) Unit, 10 gpm.
6. Stripper Feed Tank.
7. Air Stripping Tower, 1’-0” Dia. X 12’-0” H., with Exhaust blower.
8. Two (2) Activated Carbon Adsorber, Westates Carbon Company or Equivalent, Each 4’ -0” Dia. x 4’-0” H.
9. Effluent Tank, 300 Gallon Capacity.
10. Carbon Cannister, 165 lbs Capacity, venting Condensate Treatment System.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. This equipment shall not be operated unless the exhaust gas from the air stripping tower is vented to the gas header to the flare station which is in full use and has a valid Permit to Operate from the South Coast AQMD. [Rule 204]
5. Vapors from the influent tanks, oil/solids separator, oil discharge tank, DAF unit, stripper feed tank, and effluent tank shall be vented to the carbon canister.
[Rule 204]
6. The operator shall continuously monitor and record the flow rate (gallons per minute) of LFG condensate feed rate to the oil/solids separator.
[Rule 204]
7. The landfill gas condensate feed rate to the oil/solids separator shall not exceed 10 gallons per minute. [Rule 204, 1303(b)(2) Offsets]
62 of 153
Section D Page 6
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
8. Spent carbon from the carbon canister shall be replaced at frequencies necessary to ensure appropriate air pollution control and in accordance with the manufacturer’s specifications and recommendation. [Rule 204, 402]
9. The operator shall maintain records of each instance of media replenishment or change -out. The records shall include the date of each media replenishment or change-out and the type and amount of media replenished or replaced.
[Rule 204]
10. Spent carbon removed from the system shall be stored in closed containers prior to removal from site. Disposal of spent carbon shall be in accordance with all applicable hazardous materials rule s and regulations. [Rule 204]
11. If a distinct odor resulting from the operation of this equipment is detected at or beyond the facility property line, the operator shall investigate and determine the odor source(s) and undertake mitigation and/or remedial measures to correct the problem. Mitigation measures which are deemed appropriate by South Coast AQMD personnel as necessary to protect the comfort, repose, health, or safety of the public shall be implemented upon request.
[Rule 204, Rule 402]
12. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 3004(a)(4)]
63 of 153
Section D Page 7
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO OPERATE
Permit No. G7093
A/N 505049
Equipment Description:
Landfill Gas Treating System, Consisting of:
1. Two compressors, reciprocating type, each 5.0 mmscfd and 900 HP.
2. Absorber, packed column, Enviro-Scrub, 3’-0” Dia. x 20’-0” S/S H. 7,638 cfm with two circulation pumps (one standby), 30 gpm.
3. Storage Tank, Enviro-scrub, 1,000 Gallons Capacity.
4. Coalescing Knockout Drum, 2’ Diameter, Maximum.
5. Air-Cooled Chilled Water/Glycol Unit, 55 Tons.
6. Economizer, Shell and Tube Type, 435,000 Btu/hr.
7. Feed Gas Chiller, Shell and Tube Type, 650,000 Btu/hr.
8. Refrigeration Knock-Out Drum, Vertical Type, 3’-0” Dia. x 7’-9” S/S H.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
3. All landfill gas (LFG) collected shall be delivered to air pollution control or treatment equipment which can adequately process the volume of gas collected and which has a valid permit from the South Coast AQMD to combust LFG.
[Rule 204]
4. The sulfur content of the LFG (as H2S) leaving this equipment shall be determined and recorded daily during normal working hours. Daily sulfur monitoring is not required during weekend and holidays. The measurement shall be conduct using a South Coast AQMD approved instrument and/or method. [Rule 204]
5. The operator shall continuously monitor and record the flow rate (scfm) of LFG treated by this system. In case a pressure sensor device is used in place of the flow indicator, a conversion chart shall be available t o indicate the correspondent flow rate in scfm, to the pressure reading. [Rule 204]
6. The total volume of LFG treated by this system shall not exceed 7,638 standard cubic feet per minute. [Rule 204, Rule 1303(b)(2) Offsets]
64 of 153
Section D Page 8
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
7. All LFG processing components under positive pressure shall be monitored for leaks on a quarterly basis and prior to scheduled maintenance or during planned outage periods or as otherwise approved in a valid Rule 1150.1 Compliance Plan using an approved Organic Vapor Analyzer (OVA). Dates, times, monitoring results, and corrective actions shall be kept and maintained on file. [Rule 204, 1150.1]
8. This equipment shall be operated so that there are no leaks that exceed 500 ppm total organic compounds, measured as methane, at any LFG processing component under positive pressure. Any component leak must be tagged and repaired with 10 calendar days from the time of the first exceedance as applicable, or as otherwise approved in a valid Rule 1150.1 Compliance Plan.
[Rule 204, and Rule 1150.1]
9. Operation of this equipment shall not result in the release of LFG or regeneration off-gas into the atmosphere.
Any breakdown or malfunction which results in emission of LFG or regeneration off -gas shall be reported to South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be undertaken to correct the problem and prevent further emissions into the atmosphere. [Rule 402, Rule 430]
10. If a distinct odor resulting from the operation of this equipment is detected at or beyond the facility property line, the operator shall investigate and determine the odor source(s) and undertake mitigation and/or remedial measures to correct the problem. Mitigation measures which are deemed appropriate by South Coast AQMD personnel as necessary to protect the comfort, repose, health, or safety of the public shall be implemented upon request.
[Rule 204, Rule 402]
11. The operator shall maintain records of each instance of media replenishment or change -out. The records shall include the date of each media replenishment or change-out and the type and amount of media replenished or replaced.
[Rule 204]
12. All records required to demonstrate compliance with this permit shall be kept and maintained for at least five (5) years and shall be made available to South Coast AQMD personnel upon request. [Rule 204, 3004(a)(4)]
65 of 153
Section D Page 9
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
RULE 219 EQUIPMENT
Equipment Description:
Rule 219 Exempt Equipment, Coating Equipment, Portable Architectural Coatings:
Periodic Monitoring:
1. The operator shall keep records, in a manner approved by the South Coast AQMD, for the following parameter(s) or item(s):
For architectural applications where no thinners, reducers, or other VOC containing materials are added, maintain semi-annual records of all coating consisting of (a) coating type, (b) VOC content as supplied in grams per liter (g/L) of material used for low-solids coatings, (c) VOC content as supplied in g/L of coating, less water and exempt solvent, for other coating.
For other architectural applications where thinner, reducers, or other VOC containing material are added, maintain daily records for each coating consisting of (a) coating type, (b) VOC content as supplied in grams per liter (g/L) of material used for low-solids coatings, (c) VOC content as supplied in g/L of coating, less water and exempt solvent, for other coating.
[Rule 3004(a)(4)]
Emissions and Requirements:
2. This equipment is subject to the applicable requirements of the following Rules and Regulations:
VOC: Rule 1113, See Appendix B for emissions limits
VOC: Rule 1171, See Appendix B for emissions limits
66 of 153
Section D Page 10
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
RULE 219 EQUIPMENT
Equipment Description:
Rule 219 Exempt Equipment, Hand Wiping Operations.
Emissions and Requirements:
1. This equipment is subject to the applicable requirements of the follo wing Rules and Regulations:
VOC: Rule 1171, See Appendix B for emissions limits
67 of 153
Section D Page 11
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
RULE 219 EQUIPMENT
Equipment Description:
Rule 219 Exempt Equipment, Air Conditioning Units.
Emissions and Requirements:
1. This equipment is subject to the applicable requirements of the following Rules and Regulations:
VOC: Rule 1415
VOC: 40 CFR 82 Subpart F
68 of 153
Section H Page 1
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
.
Permit to Construct and Temporary Permit to Operate
(Section H)
This section consists of a table listing all individual Permits to Construct and temporary Permits to Operate issued to various equipment at the facility. Each permit will list operating conditions , including periodic monitoring requirements and applicable emission limits and requirements. Also included are the rule origin and authority of each emission limit and permit condition.
69 of 153
Section H Page 2
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMITTED EQUIPMENT LIST
The following is a list of all Permits to Construct and temporary Permits to Operate at this facility:
Application No. Equipment Description Page No.
595659 Landfill Gas to Energy System, Internal Combustion Engine, 4,183 BHP, No. 1 5 595660 Landfill Gas to Energy System, Internal Combustion Engine, 4,183 BHP, No. 2 13 595661 Landfill Gas to Energy System, Internal Combustion Engine, 4,183 BHP, No. 3 21 595662 Landfill Gas to Energy System, Internal Combustion Engine, 4,183 BHP, No. 4 29 595663 Air Pollution Control System No. 1, Oxidation Catalyst, Selective Catalytic Reduction (SCR) System
37 595664 Selective Catalytic Reduction (SCR), No.2 44
595665 Selective Catalytic Reduction (SCR), No.3 51
595666 Selective Catalytic Reduction (SCR), No.4 58
595667 Landfill Gas Treatment (Sulfur and Siloxane Removal) System 65 595669 Storage Tank, Aqueous Ammonia 68
595670 Enclosed Regeneration Gas Landfill Gas Flare, 6.85 MMBTU/hr (HHV) 70
NOTE: Equipment listed above that have no corresponding Permit to Operate number are issued Permits to Construct.
The issuance or denial of their Permits to Operate is subject to engineering final review. Any other applications that are still being processed and have not been issued Permits to Construct or Permits to Operate will not be found in this Title V Permit.
70 of 153
Section H Page 3
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
FACILITY WIDE CONDITION(S)
Conditions:
1. Except for open abrasive blasting operations, the operator shall not discharge into the atmosphere from any single source of emissions whatsoever any air contaminant for a period or periods aggregating more than three minutes in any one hour which is:
A. As dark or darker in shade as that designated No. 1 on the Ringlemann Chart, as published by the United States Bureau of Mines; or
B. Of such opacity as to obscure an observer’s view to a degree equal to or greater than does smoke described in subparagraph (A) of this condition.
[Rule 401]
2. The operator shall monitor, at least on a monthly basis, total sulfur compounds calculated as hydrogen sulfide burned in gaseous fuels other than natural gas. All monitoring results shall be kept and maintained for at least five years and made available to South Coast AQMD personnel upon request. This facility shall not emit total sulfur compounds equal to or greater than 5 pounds per day, calculated as hydrogen sulfide from the combustion of gaseous fuels other than natural gas. If the 5 pounds per day total sulfur compounds calculated as hydrogen sulfide limit is reached or exceeded, then the operator shall conduct the following pursuant to Rule 431.1:
A. The operator shall not burn landfill gas containing sulfur compounds in excess of 150 ppmv calculated as hydrogen sulfide averaged daily;
B. The operator shall not burn other (non-natural gas) gases containing sulfur compounds in excess of 40 ppmv calculated as hydrogen sulfide with an averaging period of 4 hours; and C. The operator shall monitor the total sulfur compounds calculated as hydrogen sulfide burned in gaseous fuels pursuant to Rule 431.1(d) and follow the recordkeeping and reporting req uirements pursuant to Rule 431.1(e).
[Rule 204, Rule 431.1]
3. The owner or operator shall comply with all applicable contents of the mitigation measures stipulated in the Final Environmental Impact Report (FEIR) for City of Glendale Biogas Renewable Generation Project. [Rule 204, CA PRC CEQA]
4. Electronic Recording Device shall archive data in a secure encrypted format to non -volatile data storage.
Instantaneous reading shall be recorded at a frequency of not less than once per minute. The recorder/software shall be capable of displaying and printing out plots of data within three hours of a request. Where external storage media is used it shall be replaced at a sufficient frequency to ensure that the amount of stored data is at no more than 90% of the stage capacity of the media.
[Rule 204, 3004(a)(4)]
5. Continuous operation of monitoring systems not subject to Rule 218.2, or Rule 218.3 are not required when the associated basic equipment is not in operation, or when necessary calibration , maintenance or repair activities are performed in accordance with manufacturers recommendation. The operator shall take all reasonable actions to minimize the time required to perform such activities. In no event shall any such activities exceed 96 conse cutive hours for any one calibration, maintenance, or repair episode. The operator shall notify the South Coast AQMD within twenty-four (24) hours of the start of a calibration, maintenance or repair activity, if the activity is expected to last more than 24 consecutive hours.
[Rule 204]
71 of 153
Section H Page 4
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
6. The operator shall synchronize all recorders with respect to the time of day. [Rule 204]
7. The hydrogen sulfide (H2S) concentration at the downwind property fence line boundary shall not exceed 0.03 ppmv as determined in accordance with state ambient air quality standards (AAQS) averaging times, or any revised AAQS which may become effective during the operation of the facility. [Rule 204, Rule 402]
72 of 153
Section H Page 5
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595659
Granted as of: TBD
Equipment Description:
Landfill Gas to Energy System No. 1 consisting of:
1. Pretreated Landfill Gas (LFG) Supply Line.
2. Internal Combustion Engine, No. 1, GE Jenbacher, Model J620 GS-F21, Landfill Gas and Natural Gas Fueled, Non-Emergency, Four Cycle, Twenty Cylinders, Lean Burn, Turbocharged and intercooled, rate at 4,183 bhp, driving an Electric Generator with a Gross Output of 3.03 MW.
3. Engine exhaust system vented to one Air Pollution Control System No. 1 (under Application No. 595663 or subsequent).
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. This engine shall be operated in compliance with all applicable provisions of Rule 218.2, Rule 218.3, Rule 431.1, Rule 1110.2, Rule 1150.1, NSPS 40 CFR Part 60 Subpart JJJJ, and NESHAP 40 CFR Part 63 Subpart ZZZZ.
[Rule 204, 218.2, 218.3, 431.1, 1110.2, 1150.1, 40 CFR part 60 Subparts JJJJ, CFR 40 Part 63 Subparts ZZZZ
5. This equipment shall not be operated unless its exhaust is vented to an air pollution control system which is in operation in accordance with the air pollution control system’s valid Permit to Construct or Operate issued by the South Coast AQMD.
[Rule 204]
6. This equipment shall be fueled on landfill gas (LFG) only or LFG with natural gas augmentation (landfill gas/natural gas blend).
[Rule 204]
7. A continuous flow indicating and recording device shall be installed in the LFG Supply Line and Natural Gas Supply Line to the engine to measure and record the volumetric flow rate of LFG and Natural Gas, respectively, (in standard cubic feet per minute) being supplied to each engine. The recording device shall be capable of recording gas flow at least every 15 minutes.
[Rule 204, 1150.1
8. The total heat input rate for the fuel burned in this engine shall not exceed 26.34 MMBtu per hour (HHV), as rated at standard temperature and pressure. The operator shall maintain an electronic data acquisition system or 73 of 153
Section H Page 6
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
other electronic log to record the average hourly LFG flow rate and Natural Gas flow rate based on readings taken every 15-minute interval. The high heating value (HHV) of the LFG shall be analyzed and recorded at least once per week. The total heat input rate (MMBtu per hour) shall be calculated based on the average hourly flow rate of LFG and natural gas, and the HHV of the LFG and natural gas. [Rule 1303(b)(1), 1303(b)(2) Offset]
9. Gas quality parameters, including but not limited to LFG HHV and methane percent, shall be analyzed and recorded using an instrument and/or method approved by the South Coast AQMD. [Rule 204]
10. The facility monthly average landfill gas usage by the engine shall be 90% or more, based on the higher heating value of the fuels used. The calculation of the monthly facility biogas use percentage may exclude natural gas fired during: any electrical outage at the facility; and a Stage 2 or higher electrical emergencies called by the California Independent System Operator Corporation.
[Rule 1110.2]
11. The emissions from this engine (inclusive of the associated air pollution control system) shall not exceed the following limits, except during periods of engine start-up, until sufficient operating temperatures are reached for proper operation of the emission control equipment or for the tuning of the engine and/or emission control equipment and an engine shutdown period. The start-up and shutdown periods shall not exceed 30 minutes.
Pollutant Emission Limit
Volatile Organic Compounds (VOC) 30 ppmv@15% O2 Dry
Oxides of Nitrogen (NOx) 11 ppmv@15% O2 Dry
Carbon Monoxide (CO) 250 ppmv@15% O2 Dry
NOx and CO emissions shall be averaged over a fixed-interval of one hour for engines equipped with a continuous emissions monitoring system. VOC shall be averaged over the sampling time required by the test method.
[Rule 1110.2]
12. This equipment shall reduce non-methane organic compounds (NMOC) by at least 98 percent by weight or reduce the outlet NMOC concentration to less than 20 ppmv, dry basis as hexane at 3 percent oxygen. [Rule 1150.1, 40 CFR part 62 Subpart F, 40 CFR part 63 subpart AAAA]
13. This equipment shall reduce the outlet methane concentration to less than 3000 ppmv, dry basis, corrected to 15 percent oxygen.
[Rule 1150.1]
14. A continuous emission monitoring system (CEMS) shall be installed, operated, and maintained to measure the engine exhaust concentration for NOx and O2, on a dry basis. In addition, the system shall convert the actual NOx concentration to a corrected NOx concentration at 15% O2 and continuously record the stack NOx concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification let ter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
74 of 153
Section H Page 7
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The operator shall apply for, obtain, and maintain a valid Inspection and Maintenance Plan (I&M) Plan or shall install, operate, and maintain a continuous emission monitoring system (CEMS) that measures the engine exhaust concentration for CO, on a dry basis. If a CEMS for CO is installed, the system shall convert the actual CO concentration to a corrected CO concentration at 15% O2 and continuously record the stack CO concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
16. This engine shall be operated in compliance with all applicable monitoring, testing, recordkeeping, and reporting requirements of Rule 1110.2 (f)(1), including but not limited to:
A. The operator shall install and maintain an operational non-resettable totalizing time meter on the engine (display reading shall be readily available) to determine the engine elapsed operating time.
B. Conduct source testing for NOx, VOC, reported as carbon, and CO concentration in ppm by volume, corrected to 15% oxygen on dry basis, at least once every two years, or every 8,760 operating hours, whichever occurs first. Relative accuracy tests required by Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS. The Source test frequency may be reduced to once every three years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a source test is due, the source test shall be conducted by the end of seven consecutive days or 15 cumulative days of resumed operation.
Conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady-state condition unless it is the normal operation. In addition, conduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load, or the maximum load that can be practically achieved during the test, an d; at actual minimum load, excluding idle, or the minimum load that can be practically achieved during the test.
The operator shall use only a source test contractor that is approved by the Executive Officer under the South Coast AQMD Laboratory approval program (LAP) for the necessary test methods. The operator shall comply with the procedures stated in Rule 1110.2 (f)(1)(C)(iv) through (vii), regarding the submittal of source test protocol, source test reports and utilities for sampling and testing equi pment.
C. Maintain a monthly operating engine log that includes:
i. Total hours of operation,
ii. Type of gaseous fuel,
iii. Fuel consumption (standard cubic feet of gas, and MMBtu), and iv. Cumulative hours of operation since the last source test required in subparagraph (f)(1)(C) of Rule 1110.2.
The log shall be made available upon request.
D. The operator shall comply with the reporting requirements of Rule 1110.2 (f)(1)(H)(i) through (iii), pertaining to any equipment breakdown that results in emissions in excess of rule or permit emissions limits.
[Rule, 204, 1110.2]
75 of 153
Section H Page 8
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
17. An adequate number of sampling port(s) and welded nipples with caps with safe access shall be installed and maintained at the inlet gas line(s) to the engine to allow the collection of each fuel gas (landfill gas and landfill gas/natural gas blend, as applicable) for samples in accordance with Rule 217 and South Coast AQMD’s approval.
[Rule 204, 217, 431.1, 1150.1]
18. An adequate number of sampling ports shall be maintained in the exhaust stack at least one -half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g., elbows, tees and fans). Each sampling port shall consist of a four-inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provi ded within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
19. Operation of this equipment shall not result in the release of LFG into the atmosphere. Any breakdown or malfunction which results in emissions of LFG shall be reported to the South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be undertaken to correct the problem and prevent further emissions into the atmosphere.
[Rule 204, 402, 430, 1150.1]
20. The owner or operator of the CEMS shall notify the South Coast AQMD by calling 1 -800-CUT-SMOG if the concentration level and/or emission rate, as applicable, is in excess of the emission limit(s) within 24 hours or the next working day after such occurrence.
[Rule 204, 218.2]
21. The operator shall comply with Rule 218.2 CEMS failure and/or shutdown requirements. Pursuant to Rule 218.2, a notification shall be submitted for CEMS failure and/or shutdown exceeding 24 hours. Shutdown events shall not exceed 96 hours, except as extended pursuant to Rule 218.2, as applicable. The operator shall log the time, date, duration, cause of the CEMS failure, description of the occurrence, and description of any corrective action taken for each failure and/or shutdown event, and report to the South Coast AQMD in accordance Rule 218.2, as applicable.
[Rule 204, 218.2]
22. As applicable pursuant to Rule 218.2, in the event of a scheduled shutdown of the CEMS, the operator shall notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 96 hours prior to the scheduled CEMS shutdown, submit a written report to South Coast AQMD within 24 hours of CEMS shutdown indicating that the engine is non-operational and there are no emissions during the period of engine shutdown, and shall notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 8 hours prior to the scheduled CEMS restart. [Rule 204, 218.2]
23. As applicable pursuant to Rule 218.2, in the event that the engine does not operate for a minimum of 168 consecutive hours, as demonstrated pursuant to the provisions of Rule 218.2(e)(4), the owner or operator of the CEMS shall not be subject to Rule 218.2(e)(1) after zero emissions have been recorded for a minimum of 4 hours after the engine shutdown, provided that the owner or operator: maintains the CEMS operation pursuant to Rule 218.2(e)(1) to record zero emissions for a minimum of 4 hours after the engine shutdown, submits the notifications and report in accordance with Rule 218.2(i)(4), resumes CEMS operation and meet the requirements of Rule 218.2(e)(1) for a minimum of 4 hours before the engine resumes operation or at which time any emissions are generated; and conducts a calibration error test for each CEMS analyzer before any emissions are detected.
[Rule 204, 218.2]
76 of 153
Section H Page 9
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
24. The owner or operator shall conduct a source test within 180 days of initial start-up of this equipment operated with each fuel type, unless otherwise approved in writing by South Coast AQMD. The initial source tests shall be performed when the engine is operating at maximum, minimum, and average loads each for fuel landfill gas and landfill gas/natural gas blend and as indicated below, unless otherwise approved in writing by South Coast AQMD. Thereafter, subsequent source tests shall be performed in accordance with Rule 1110.2 and Rule 1150.1 as indicated below, in as-found operating conditions.
A. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) for the necessary test methods and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
B. Sampling facilities shall comply with South Coast AQMD "Guidelines for Construction of Sampling and Testing Facilities” pursuant to Rule 217.
C. The LAP contractor shall not conduct any pre-tests for compliance.
D. Pursuant to Rule 1150.1, the operator shall conduct source testing as follows, or pursuant to a valid and approved Rule 1150.1 Compliance Plan:
i. The operator shall conduct source testing for NMOC as hexane and methane annually.
Subsequent annual source tests shall be conducted no later than 45 days after the annivers ary date of the initial source test. The initial source test shall be submitted to South Coast AQMD no later than 180 days after start-up and each succeeding complete annual source test report no later than 45 days after the anniversary date of the initial source test.
E. Pursuant to Rule 1110.2(f)(1), the operator shall conduct source testing as follows:
i. The operator shall conduct source testing for NOx, VOC reported as carbon, and CO at least once every two years from the date the previous source test, no later than the last day of the calendar month that the test is due, or every 8,760 operating hours, whichever occurs first.
ii. Frequency of subsequent source tests may be reduced to once every 3 years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a Rule 1110.2 source test is due, the source test shall be conducted by the end of 7 consecutive days or 15 cumulative days of resumed operation. An owner or operator of the engine shall keep sufficient operating records to demonstrate that it meets the requirements for extension of the source testing deadlines.
iii. The operator shall submit all source test reports, including a description of the equipment tested to South Coast AQMD within 60 days of completion of the test.
iv. Relative accuracy tests required by Rule 218.1, Rule 218.2, Rule 218.3 or 40 C FR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS for all applicable operating loads specified in Rule 1110.2(f)(1). Pursuant to Rule 218.3 as applicable, if the engine is not operating or generating emissions when a RATA is due, the RATA shall be performed within 14 days after the engine is restarted and resumes normal operation.
v. South Coast AQMD shall be notified of the scheduled source test date at least 30 days prior to conducting a source test. If after 30 days’ notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance 77 of 153
Section H Page 10
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
test, the engine operator shall notify the Executive Officer as soon as possible of any delay in the original test date, either by providing at least seven days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Executive Officer by mutual agreement.
vi. Source tests shall be conducted at least 40 operating hours or at least 1 week after any engine servicing or tuning.
vii. The LAP contractor shall conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady -state condition unless it is the normal operation. In addition, the LAP contractor shall co nduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load (or the maximum load that can be practically achieved during the test); and at actual minimum load, excluding idle (or the minimum load that can be practically achieved during the test).
vii. If an emission exceedance is found during any of the three phases of the test, that phase shall be completed and reported. An operator shall correct the exceedance, and the source test shall be immediately resumed.
F. Pursuant to Title V Periodic Monitoring Guidelines, the operator shall conduct source testing of each emission limit identified with a Rule 1303(a)(1)BACT or Rule 1303(a)(1)BACT/LAER tag (See Emissions and Requirements section below) at least once every 5 years. [Rule 204, 217, 218.2, 218.3, 304, 1110.2, 1150.1, 3004(a)(4)]
25. A source test protocol shall be submitted to South Coast AQMD at least 60 days before the scheduled test date and shall be approved in writing by South Coast AQMD before the test commences or a valid previously South Coast AQMD approved protocol may be used for recurring source test. If the operator submits the protocol by the required date, and the Executive Officer takes longer than 60 days to approve the protocol, the operator shall be allowed the additional time needed to conduct the test. At a minimum, the source test protocol should include the following, unless otherwise approved in writing by South Coast AQMD:
A. The name, address, and phone number of the unit operator and the South Coast AQMD-approved source testing contractor that will conduct the test(s).
B. The application and permit number(s).
C. A copy of the current valid approved permit(s).
D. The current emission limits.
E. A description of the equipment to be tested. Include a process schematic indicating sampling locations/ports, and sampling duct/stack dimensions along with upstream and downstream flow disturbances (e.g., elbows, tees, and fans).
F. A brief process description.
G. Operating conditions under which the test will be performed, including flow rate, temperature, pressure, number of tests to be conducted, operating loads, and required minimum sampling times.
H. A description of the sampling and analytical methods for each constituent measured.
78 of 153
Section H Page 11
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
I. Complete calculations for flow rates, concentrations, emission rates, and efficiencies.
J. A description of the calibration and quality assurance procedures.
K. A description of the parameters to be measured in accordance with the Inspection & Monitoring (I&M) plan requirements of Rule 1110.2, as applicable.
L. Copy of LAP approval for methods being used in the source test.
M. A statement determining that the testing laboratory qualifies as an “independent tes ting laboratory” under Rule 304 (no conflict of interest), signed by the responsible authority. [Rule 204, 217, 304, 1110.2]
26. An owner or operator shall submit all source test results in a source test report, including a description of the equipment tested, to the South Coast AQMD Waste Management Permitting Unit in accordance with Rule 1110.2 and Rule 1150.1 and the source test report submittal deadlines indicated in the conditions above. The source test report shall include, but not be limited to the following, unless otherwise approved in writing by South Coast AQMD:
A. Fuel flow rate for each fuel or fuel blend used during the source test, (standard cubic feet per minute).
B. Exhaust gas flow rate for each engine load and each fuel or fuel blend used during the source test (standard cubic feet per minute).
C. Higher heating value (HHV) of each fuel or fuel blend used during the source test (Btu/scf).
D. Methane content of each fuel or fuel blend used during the source test (single load) (percent by volume) and at outlet of air pollution control (APC) (lb/hr, ppmvd and ppmvd @15% O2, destruction efficiency by weight).
E. Total non-methane organic compounds (TNMOC)/VOC at inlet for each fuel or fuel blend used during the source test (single load) and outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @3% O2, destruction efficiency by weight).
F. Carbon monoxide at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2.
G. Oxides of nitrogen at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2).
H. Carbon dioxide of each fuel or fuel blends used during the source test and outlet of APC (lb/hr, ppmvd, percent by volume).
I. Total particulates/PM10 at outlet of APC (grains/dscf, g/bhp-hr, lb/hour).
J. Total reduced sulfur, as H2S and speciated sulfur compounds of landfill gas (single load) (ppmv).
K. Total siloxanes (organic silicon compounds) of landfill gas and at outlet of engine and outlet of APC (ppmv).
L. Aldehydes of each fuel or fuel blend used during the source test and at outlet of APC (initial test only) (ppmv).
M. Speciated organics, including, but not limited to, Rule 1150.1 Table 1 Carcinogenic and Toxic Air Contaminants of each fuel or fuel blend used during the source tests and outlet of APC only (ppmv).
N. Oxygen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
O. Nitrogen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
P. Moisture content of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
Q. Temperature at inlet and outlet of engine and outlet of APC (Fahrenheit).
The operator shall comply with all general testing, reporting, and recordkeeping requirements in Sections E and K of this permit.
[Rule 204, 1110.2, 1150.1]
79 of 153
Section H Page 12
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
29. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 1110.2, 1150.1, 3004(a)(4)]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
CO: 250 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT CO: 610 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ CO: 16.92 lb/hr, Rule 1303(b)(2) Offsets
NOx: 11 ppmvd @15% O2, dry Rule 1110.2, Rule 1303(a)(1) BACT NOx: 150 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ NOx: 1.22 lb/hr, Rule 1303(b)(2) Offsets
PM: Rule 404, See appendix B for emission limits
PM10: 0.066 grams/bhp-hr, Rule 1303(a)(1) BACT, Rule 1303(b)(2) Offsets PM/PM10: 0.61 lb/hr, Rule 1303(b)(2) Offsets
NMOC: 20 ppmvd as hexane @3% O2 or 98% by weight reduction, Rule 1150.1, 40 CFR 62 Subpart F, 40 CFR 63 Subpart AAAA
VOC: 30 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT VOC: 1.16 lb/hr as methane, Rule 1303(b)(2) Offsets
VOC: 80 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ Sulfur: 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER.
Sulfur: 85 ppmv as H2S in LFG inlet, averaged daily, Rule 1303(a)(1) BACT/LAER 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER, Rule 1303(b)(2) Offsets
SOx: 0.84 lb/hr, Rule 1303(b)(2) Offsets
80 of 153
Section H Page 13
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595660
Granted as of: TBD
Equipment Description:
Landfill Gas to Energy System No. 2 consisting of:
1. Pretreated Landfill Gas (LFG) Supply Line.
2. Internal Combustion Engine, No. 2, GE Jenbacher, Model J620 GS-F21, Landfill Gas and Natural Gas Fueled, Non-Emergency, Four Cycle, Twenty Cylinders, Lean Burn, Turbocharged and intercooled, rate at 4,183 bhp, driving an Electric Generator with a Gross Output of 3.03 MW.
3. Engine exhaust system vented to one Air Pollution Control System No. 2 (under Application No. 595664 or subsequent).
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. This engine shall be operated in compliance with all applicable provisions of Rule 218.2, Rule 218.3, Rule 431.1, Rule 1110.2, Rule 1150.1, NSPS 40 CFR Part 60 Subpart JJJJ, and NESHAP 40 CFR Part 63 Subpart ZZZZ.
[Rule 204, 218.2, 218.3, 431.1, 1110.2, 1150.1, 40 CFR part 60 Subparts JJJJ, CFR 40 Part 63 Subparts ZZZZ
5. This equipment shall not be operated unless its exhaust is vented to an air pollution control system which is in operation in accordance with the air pollution control system’s valid Permit to Construct or Operate issued by the South Coast AQMD.
[Rule 204]
6. This equipment shall be fueled on landfill gas (LFG) only or LFG with natural gas augmentation (landfill gas/natural gas blend).
[Rule 204]
7. A continuous flow indicating and recording device shall be installed in the LFG Supply Line and Natural Gas Supply Line to the engine to measure and record the volumetric flow rate of LFG and Natural Gas, respectively, (in standard cubic feet per minute) being supplied to each engine. The recording device shall be capable of recording gas flow at least every 15 minutes.
[Rule 204, 1150.1
8. The total heat input rate for the fuel burned in this engine shall not exceed 26.34 MMBtu per hour (HHV), as rated at standard temperature and pressure. The operator shall maintain an electronic data acquisition system or 81 of 153
Section H Page 14
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
other electronic log to record the average hourly LFG flow rate and Natural Gas flow rate based on readings taken every 15-minute interval. The high heating value (HHV) of the LFG shall be analyzed and recorded at least once per week. The total heat input rate (MMBtu per hour) shall be calculated based on the average hourly flow rate of LFG and natural gas, and the HHV of the LFG and natural gas. [Rule 1303(b)(1), 1303(b)(2) Offset]
9. Gas quality parameters, including but not limited to LFG HHV and methane percent, shall be analyzed and recorded using an instrument and/or method approved by the South Coast AQMD. [Rule 204]
10. The facility monthly average landfill gas usage by the engine shall be 90% or more, based on the higher heating value of the fuels used. The calculation of the monthly facility biogas use percentage may exclude natural gas fired during: any electrical outage at the facility; and a Stage 2 or higher electrical emergencies called by the California Independent System Operator Corporation.
[Rule 1110.2]
11. The emissions from this engine (inclusive of the associated air pollution control system) shall not exceed the following limits, except during periods of engine start-up, until sufficient operating temperatures are reached for proper operation of the emission control equipment or for the tuning of the engine and/or emission control equipment and an engine shutdown period. The start-up and shutdown periods shall not exceed 30 minutes.
Pollutant Emission Limit
Volatile Organic Compounds (VOC) 30 ppmv@15% O2 Dry
Oxides of Nitrogen (NOx) 11 ppmv@15% O2 Dry
Carbon Monoxide (CO) 250 ppmv@15% O2 Dry
NOx and CO emissions shall be averaged over a fixed-interval of one hour for engines equipped with a continuous emissions monitoring system. VOC shall be averaged over the sampling time required by the test method.
[Rule 1110.2]
12. This equipment shall reduce non-methane organic compounds (NMOC) by at least 98 percent by weight or reduce the outlet NMOC concentration to less than 20 ppmv, dry basis as hexane at 3 percent oxygen. [Rule 1150.1, 40 CFR part 62 Subpart F, 40 CFR part 63 subpart AAAA]
13. This equipment shall reduce the outlet methane concentration to less than 3000 ppmv, dry basis, corrected to 15 percent oxygen.
[Rule 1150.1]
14. A continuous emission monitoring system (CEMS) shall be installed, operated, and maintained to measure the engine exhaust concentration for NOx and O2, on a dry basis. In addition, the system shall convert the actual NOx concentration to a corrected NOx concentration at 15% O2 and continuously record the stack NOx concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
82 of 153
Section H Page 15
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The operator shall apply for, obtain, and maintain a valid Inspection and Maintenance Plan (I&M) Plan or shall install, operate, and maintain a continuous emission monitoring system (CEMS) that measures the engine exhaust concentration for CO, on a dry basis. If a CEMS for CO is installed, the system shall convert the actual CO concentration to a corrected CO concentration at 15% O2 and continuously record the stack CO concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specifie d by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
16. This engine shall be operated in compliance with all applicable monitoring, testing, recordkeeping, and reporting requirements of Rule 1110.2 (f)(1), including but not limited to:
A. The operator shall install and maintain an operational non-resettable totalizing time meter on the engine (display reading shall be readily available) to determine the engine elapsed operating time.
B. Conduct source testing for NOx, VOC, reported as carbon, and CO concentration in ppm by volume, corrected to 15% oxygen on dry basis, at least once every two years, or every 8,760 operating hours, whichever occurs first. Relative accuracy tests required by Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS. The Source test frequency may be reduced to once every three years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a source test is due, the source test shall be conducted by the end of seven consecutive days or 15 cumulative days of resumed operation.
Conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady-state condition unless it is the normal operation. In addition, conduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load, or the maximum load that can be practically achieved during the test, an d; at actual minimum load, excluding idle, or the minimum load that can be practically achieved during the test.
The operator shall use only a source test contractor that is approved by the Executive Officer under the South Coast AQMD Laboratory approval program (LAP) for the necessary test methods. The operator shall comply with the procedures stated in Rule 1110.2 (f)(1)(C)(iv) through (vii), regarding the submittal of source test protocol, source test reports and utilities for sampling and testing equi pment.
C. Maintain a monthly operating engine log that includes:
i. Total hours of operation,
ii. Type of gaseous fuel,
iii. Fuel consumption (standard cubic feet of gas, and MMBtu), and iv. Cumulative hours of operation since the last source test required in subparagraph (f)(1)(C) of Rule 1110.2.
The log shall be made available upon request.
D. The operator shall comply with the reporting requirements of Rule 1110.2 (f)(1)(H)(i) through (iii), pertaining to any equipment breakdown that results in emissions in excess of rule or permit emissions limits.
[Rule, 204, 1110.2]
83 of 153
Section H Page 16
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
17. An adequate number of sampling port(s) and welded nipples with caps with safe access shall be installed and maintained at the inlet gas line(s) to the engine to allow the collection of each fuel gas (landfill gas and landfill gas/natural gas blend, as applicable) for samples in accordance with Rule 217 and South Coast AQMD’s approval.
[Rule 204, 217, 431.1, 1150.1]
18. An adequate number of sampling ports shall be maintained in the exhaust stack at least one -half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g., elbows, tees and fans). Each sampling port shall consist of a four-inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided withi n 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
19. Operation of this equipment shall not result in the release of LFG into the atmosphere. Any breakdown or malfunction which results in emissions of LFG shall be reported to the South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be undertaken to correct the problem and prevent further emissions into the atmosphere.
[Rule 204, 402, 430, 1150.1]
20. The owner or operator of the CEMS shall notify the South Coast AQMD by calling 1 -800-CUT-SMOG if the concentration level and/or emission rate, as applicable, is in excess of the emission limit(s) within 24 hours or the next working day after such occurrence.
[Rule 204, 218.2]
21. The operator shall comply with Rule 218.2 CEMS failure and/or shutdown requirements. Pursuant to Rule 218.2, a notification shall be submitted for CEMS failure and/or shutdown exceeding 24 hours. Shutdown events shall not exceed 96 hours, except as extended pursuant to Rule 218.2, as applicable. The operator shall log the time, date, duration, cause of the CEMS failure, description of the occurrence, and description of any corrective action taken for each failure and/or shutdown event, and report to the South Coast AQMD in accordance Rule 218.2, as applicable.
[Rule 204, 218.2]
22. As applicable pursuant to Rule 218.2, in the event of a scheduled shutdown of the CEMS, the operator shall notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 96 hours prior to the scheduled CEMS shutdown, submit a written report to South Coast AQMD within 24 hours of CEMS shutdown indicating that the engine is non-operational and there are no emissions during the period of engine shutdown, and sh all notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 8 hours prior to the scheduled CEMS restart. [Rule 204, 218.2]
23. As applicable pursuant to Rule 218.2, in the event that the engine does not operate for a minimum of 168 consecutive hours, as demonstrated pursuant to the provisions of Rule 218.2(e)(4), the owner or operator of the CEMS shall not be subject to Rule 218.2(e)(1) after zero emissions have been recorded for a minimum of 4 hours after the engine shutdown, provided that the owner or operator: maintains the CEMS operation pursuant to Rule 218.2(e)(1) to record zero emissions for a minimum of 4 hours after the engine shutdown, submits the notifications and report in accordance with Rule 218.2(i)(4), resumes CEMS operation and meet the requirements of Rule 218.2(e)(1) for a minimum of 4 hours before the engine resumes operation or at which time any emissions are generated; and conducts a calibration error test for each CEMS analyzer before any emissions are detected.
[Rule 204, 218.2]
84 of 153
Section H Page 17
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
24. The owner or operator shall conduct a source test within 180 days of initial start-up of this equipment operated with each fuel type, unless otherwise approved in writing by South Coast AQMD. The initial source tests shall be performed when the engine is operating at maximum, minimum, and average loads each for fuel landfill gas and landfill gas/natural gas blend and as indicated below, unless otherwise approved in writing by South Coast AQMD. Thereafter, subsequent source tests shall be performed in accordance with Rule 1110.2 and Rule 1150.1 as indicated below, in as-found operating conditions.
A. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) for the necessary test methods and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
B. Sampling facilities shall comply with South Coast AQMD "Guidelines for Construction of Sampling and Testing Facilities” pursuant to Rule 217.
C. The LAP contractor shall not conduct any pre-tests for compliance.
D. Pursuant to Rule 1150.1, the operator shall conduct source testing as follows, or pursuant to a valid and approved Rule 1150.1 Compliance Plan:
i. The operator shall conduct source testing for NMOC as hexane and methane annually.
Subsequent annual source tests shall be conducted no later than 45 days after the anniversary date of the initial source test. The initial source test shall be submitted to South Coast AQMD no later than 180 days after start-up and each succeeding complete annual source test report no later than 45 days after the anniversary date of the initial source test.
E. Pursuant to Rule 1110.2(f)(1), the operator shall conduct source testing as follows:
i. The operator shall conduct source testing for NOx, VOC reported as carbon, and CO at least once every two years from the date the previous source test, no later than the last day of the calendar month that the test is due, or every 8,760 operating hours, whichever occurs first.
ii. Frequency of subsequent source tests may be reduced to once every 3 years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a Rule 1110.2 source test is due, the source test shall be conducted by the end of 7 consecutive days or 15 cumulative days of resumed operation. An owner or operator of the engine shall keep sufficient operating records to demonstrate that it meets the re quirements for extension of the source testing deadlines.
iii. The operator shall submit all source test reports, including a description of the equipment tested to South Coast AQMD within 60 days of completion of the test.
iv. Relative accuracy tests required by Rule 218.1, Rule 218.2, Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS for all applicable operating loads specified in Rule 1110.2(f)(1). Pursuant to Rule 218.3 as applicable, if the engine is not operating or generating emissions when a RATA is due, the RATA shall be performed within 14 days after the engine is restarted and resumes normal operation.
v. South Coast AQMD shall be notified of the scheduled source test date at least 3 0 days prior to conducting a source test. If after 30 days’ notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance 85 of 153
Section H Page 18
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
test, the engine operator shall notify the Executive Officer as soon as possible of any delay in the original test date, either by providing at least seven days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Executive Officer by mutual agreement.
vi. Source tests shall be conducted at least 40 operating hours or at least 1 week after any engine servicing or tuning.
vii. The LAP contractor shall conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady -state condition unless it is the normal operation. In addition, the LAP contractor shall co nduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load (or the maximum load that can be practically achieved during the test); and at actual minimum load, excluding idle (or the minimum load that can be practically achieved during the test).
vii. If an emission exceedance is found during any of the three phases of the test, that phase shall be completed and reported. An operator shall correct the exceedance, and the source test shall be immediately resumed.
F. Pursuant to Title V Periodic Monitoring Guidelines, the operator shall conduct source testing of each emission limit identified with a Rule 1303(a)(1)BACT or Rule 1303(a)(1)BACT/LAER tag (See Emissions and Requirements section below) at least once every 5 years. [Rule 204, 217, 218.2, 218.3, 304, 1110.2, 1150.1, 3004(a)(4)]
25. A source test protocol shall be submitted to South Coast AQMD at least 60 days before the scheduled test date and shall be approved in writing by South Coast AQMD before the test commences or a valid previously South Coast AQMD approved protocol may be used for recurring source test. If the operator submits the protocol by the required date, and the Executive Officer takes longer than 60 days to approve the protocol, the operator shall be allowed the additional time needed to conduct the test. At a minimum, the source test protocol should include the following, unless otherwise approved in writing by South Coast AQMD:
A. The name, address, and phone number of the unit operator and the South Coast AQMD-approved source testing contractor that will conduct the test(s).
B. The application and permit number(s).
C. A copy of the current valid approved permit(s).
D. The current emission limits.
E. A description of the equipment to be tested. Include a process schematic indicating sampling locations/ports, and sampling duct/stack dimensions along with upstream and downstream flow disturbances (e.g., elbows, tees, and fans).
F. A brief process description.
G. Operating conditions under which the test will be performed, including flow rate, temperature, pressure, number of tests to be conducted, operating loads, and required minimum sampling times.
H. A description of the sampling and analytical methods for each constituent measured.
86 of 153
Section H Page 19
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
I. Complete calculations for flow rates, concentrations, emission rates, and efficiencies.
J. A description of the calibration and quality assurance procedures.
K. A description of the parameters to be measured in accordance with the Inspection & Monitoring (I&M) plan requirements of Rule 1110.2, as applicable.
L. Copy of LAP approval for methods being used in the source test.
M. A statement determining that the testing laboratory qualifies as an “independent testing laboratory ” under Rule 304 (no conflict of interest), signed by the responsible authority. [Rule 204, 217, 304, 1110.2]
26. An owner or operator shall submit all source test results in a source test report, including a description of the equipment tested, to the South Coast AQMD Waste Management Permitting Unit in accordance with Rule 1110.2 and Rule 1150.1 and the source test report submittal deadlines indicated in the conditions above . The source test report shall include, but not be limited to the following, unless otherwise approved in writing by South Coast AQMD:
A. Fuel flow rate for each fuel or fuel blend used during the source test, (standard cubic feet per minute).
B. Exhaust gas flow rate for each engine load and each fuel or fuel blend used during the source test (standard cubic feet per minute).
C. Higher heating value (HHV) of each fuel or fuel blend used during the source test (Btu/scf).
D. Methane content of each fuel or fuel blend used during the source test (single load) (percent by volume) and at outlet of air pollution control (APC) (lb/hr, ppmvd and ppmvd @15% O2, destruction efficiency by weight).
E. Total non-methane organic compounds (TNMOC)/VOC at inlet for each fuel or fuel blend used during the source test (single load) and outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @3% O2, destruction efficiency by weight).
F. Carbon monoxide at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2.
G. Oxides of nitrogen at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2).
H. Carbon dioxide of each fuel or fuel blends used during the source test and outlet of APC (lb/hr, ppmvd, percent by volume).
I. Total particulates/PM10 at outlet of APC (grains/dscf, g/bhp-hr, lb/hour).
J. Total reduced sulfur, as H2S and speciated sulfur compounds of landfill gas (single load) (ppmv).
K. Total siloxanes (organic silicon compounds) of landfill gas and at outlet of engine and outlet of APC (ppmv).
L. Aldehydes of each fuel or fuel blend used during the source test and at outlet of APC (initial test only) (ppmv).
M. Speciated organics, including, but not limited to, Rule 1150.1 Table 1 Carcinogenic and Toxic Air Contaminants of each fuel or fuel blend used during the source tests and outlet of APC only (ppmv).
N. Oxygen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
O. Nitrogen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
P. Moisture content of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
Q. Temperature at inlet and outlet of engine and outlet of APC (Fahrenheit).
The operator shall comply with all general testing, reporting, and recordkeeping requirements in Sections E and K of this permit.
[Rule 204, 1110.2, 1150.1]
87 of 153
Section H Page 20
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
29. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 1110.2, 1150.1, 3004(a)(4)]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
CO: 250 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT CO: 610 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ CO: 16.92 lb/hr, Rule 1303(b)(2) Offsets
NOx: 11 ppmvd @15% O2, dry Rule 1110.2, Rule 1303(a)(1) BACT NOx: 150 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ NOx: 1.22 lb/hr, Rule 1303(b)(2) Offsets
PM: Rule 404, See appendix B for emission limits
PM10: 0.066 grams/bhp-hr, Rule 1303(a)(1) BACT, Rule 1303(b)(2) Offsets PM/PM10: 0.61 lb/hr, Rule 1303(b)(2) Offsets
NMOC: 20 ppmvd as hexane @3% O2 or 98% by weight reduction, Rule 1150.1, 40 CFR 62 Subpart F, 40 CFR 63 Subpart AAAA
VOC: 30 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT VOC: 1.16 lb/hr as methane, Rule 1303(b)(2) Offsets
VOC: 80 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ Sulfur: 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER.
Sulfur: 85 ppmv as H2S in LFG inlet, averaged daily, Rule 1303(a)(1) BACT/LAER 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER, Rule 1303(b)(2) Offsets
SOx: 0.84 lb/hr, Rule 1303(b)(2) Offsets
88 of 153
Section H Page 21
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595661
Granted as of: TBD
Equipment Description:
Landfill Gas to Energy System No. 3 consisting of:
1. Pretreated Landfill Gas (LFG) Supply Line.
2. Internal Combustion Engine, No. 3, GE Jenbacher, Model J620 GS-F21, Landfill Gas and Natural Gas Fueled, Non-Emergency, Four Cycle, Twenty Cylinders, Lean Burn, Turbocharged and intercooled, rate at 4,183 bhp, driving an Electric Generator with a Gross Output of 3.03 MW.
3. Engine exhaust system vented to one Air Pollution Control System No. 3 (under Application No. 595665 or subsequent).
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. This engine shall be operated in compliance with all applicable provisions of Rule 218.2, Rule 218.3, Rule 431.1, Rule 1110.2, Rule 1150.1, NSPS 40 CFR Part 60 Subpart JJJJ, and NESHAP 40 CFR Part 63 Subpart ZZZZ.
[Rule 204, 218.2, 218.3, 431.1, 1110.2, 1150.1, 40 CFR part 60 Subparts JJJJ, CFR 40 Part 63 Subparts ZZZZ
5. This equipment shall not be operated unless its exhaust is vented to an air pollution control system which is in operation in accordance with the air pollution control system’s valid Permit to Construct or Operate issued by the South Coast AQMD.
[Rule 204]
6. This equipment shall be fueled on landfill gas (LFG) only or LFG with natural gas augmentation (landfill gas/natural gas blend).
[Rule 204]
7. A continuous flow indicating and recording device shall be installed in the LFG Supply Line and Natural Gas Supply Line to the engine to measure and record the volumetric flow rate of LFG and Natural Gas, respectively, (in standard cubic feet per minute) being supplied to each engine. The recording device shall be capable of recording gas flow at least every 15 minutes.
[Rule 204, 1150.1
8. The total heat input rate for the fuel burned in this engine shall not exceed 26.34 MMBtu per hour (HHV), as rated at standard temperature and pressure. The operator shall maintain an electronic data acquisition system or 89 of 153
Section H Page 22
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
other electronic log to record the average hourly LFG flow rate and Natural Gas flow rate based on readings taken every 15-minute interval. The high heating value (HHV) of the LFG shall be analyzed and recorded at least once per week. The total heat input rate (MMBtu per hour) shall be calculated based on the average hourly flow rate of LFG and natural gas, and the HHV of the LFG and natural gas. [Rule 1303(b)(1), 1303(b)(2) Offset]
9. Gas quality parameters, including but not limited to LFG HHV and methane percent, shall be analyzed and recorded using an instrument and/or method approved by the South Coast AQMD. [Rule 204]
10. The facility monthly average landfill gas usage by the engine shall be 90% or more, based on the higher heating value of the fuels used. The calculation of the monthly facility biogas use percentage may exclude natural gas fired during: any electrical outage at the facility; and a Stage 2 or higher electrical emergencies called by the California Independent System Operator Corporation.
[Rule 1110.2]
11. The emissions from this engine (inclusive of the associated air pollution control system) shall not exceed the following limits, except during periods of engine start-up, until sufficient operating temperatures are reached for proper operation of the emission control equipment or for the tuning of the engine and/or emission control equipment and an engine shutdown period. The start-up and shutdown periods shall not exceed 30 minutes.
Pollutant Emission Limit
Volatile Organic Compounds (VOC) 30 ppmv@15% O2 Dry
Oxides of Nitrogen (NOx) 11 ppmv@15% O2 Dry
Carbon Monoxide (CO) 250 ppmv@15% O2 Dry
NOx and CO emissions shall be averaged over a fixed-interval of one hour for engines equipped with a continuous emissions monitoring system. VOC shall be averaged over the sampling time required by the test method.
[Rule 1110.2]
12. This equipment shall reduce non-methane organic compounds (NMOC) by at least 98 percent by weight or reduce the outlet NMOC concentration to less than 20 ppmv, dry basis as hexane at 3 percent oxygen. [Rule 1150.1, 40 CFR part 62 Subpart F, 40 CFR part 63 subpart AAAA]
13. This equipment shall reduce the outlet methane concentration to less than 3000 ppmv, dry basis, corrected to 15 percent oxygen.
[Rule 1150.1]
14. A continuous emission monitoring system (CEMS) shall be installed, operated, and maintained to measure the engine exhaust concentration for NOx and O2, on a dry basis. In addition, the system shall convert the actual NOx concentration to a corrected NOx concentration at 15% O2 and continuously record the s tack NOx concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementatio n schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
90 of 153
Section H Page 23
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The operator shall apply for, obtain, and maintain a valid Inspection and Maintenance Plan (I&M) Plan or shall install, operate, and maintain a continuous emission monitoring system (CEMS) that measures the engine exhaust concentration for CO, on a dry basis. If a CEMS for CO is installed, the system shall convert the actual CO concentration to a corrected CO concentration at 15% O2 and continuously record the stack CO concentration at 15% O2. This monitoring system shall comply with the requirements of Sou th Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
16. This engine shall be operated in compliance with all applicable monitoring, testing, recordkeeping, and reporting requirements of Rule 1110.2 (f)(1), including but not limited to:
A. The operator shall install and maintain an operational non-resettable totalizing time meter on the engine (display reading shall be readily available) to determine the engine elapsed operating time.
B. Conduct source testing for NOx, VOC, reported as carbon, and CO concentration in ppm by volume, corrected to 15% oxygen on dry basis, at least once every two years, or every 8,760 operating hours, whichever occurs first. Relative accuracy tests required by Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS. The Source test frequency may be reduced to once every three years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a source test is due, the source test sha ll be conducted by the end of seven consecutive days or 15 cumulative days of resumed operation.
Conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady-state condition unless it is the normal operation. In addition, conduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load, or the maximum load that can be practically achieved during the test, and; at actual minimum load, excluding idle, or the minimum load that can be practically achieved during the test.
The operator shall use only a source test contractor that is approved by the Executive Officer under the South Coast AQMD Laboratory approval program (LAP) for the necessary test methods. The operator shall comply with the procedures stated in Rule 1110.2 (f)(1)(C)(iv) through (vii), regarding the submittal of source test protocol, source test reports and utilities for sampling and testing equipment.
C. Maintain a monthly operating engine log that includes:
i. Total hours of operation,
ii. Type of gaseous fuel,
iii. Fuel consumption (standard cubic feet of gas, and MMBtu), and iv. Cumulative hours of operation since the last source test required in subparagraph (f)(1)(C) of Rule 1110.2.
The log shall be made available upon request.
D. The operator shall comply with the reporting requirements of Rule 1110.2 (f)(1)(H)(i) through (iii), pertaining to any equipment breakdown that results in emissions in excess of rule or permit emissions limits.
[Rule, 204, 1110.2]
91 of 153
Section H Page 24
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
17. An adequate number of sampling port(s) and welded nipples with caps with safe access shall be installed and maintained at the inlet gas line(s) to the engine to allow the collection of each fuel gas (landfill gas and landfill gas/natural gas blend, as applicable) for samples in accordance with Rule 217 and South Coast AQMD’s approval.
[Rule 204, 217, 431.1, 1150.1]
18. An adequate number of sampling ports shall be maintained in the exhaust stack at least one -half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g., elbows, tees and fans). Each sampling port shall consist of a four-inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provi ded within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
19. Operation of this equipment shall not result in the release of LFG into the atmosphere. Any breakdown or malfunction which results in emissions of LFG shall be reported to the South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be undertaken to correct the problem and prevent further emissions into the atmosphere.
[Rule 204, 402, 430, 1150.1]
20. The owner or operator of the CEMS shall notify the South Coast AQMD by calling 1 -800-CUT-SMOG if the concentration level and/or emission rate, as applicable, is in excess of the emission limit(s) within 24 hours or the next working day after such occurrence.
[Rule 204, 218.2]
21. The operator shall comply with Rule 218.2 CEMS failure and/or shutdown requirements. Pursuant to Rule 218.2, a notification shall be submitted for CEMS failure and/or shutdown exceeding 24 hours. Shutdown events shall not exceed 96 hours, except as extended pursuant to Rule 218.2, as applicable. The operator shall log the time, date, duration, cause of the CEMS failure, description of the occurrence, and description of any corrective action taken for each failure and/or shutdown event, and report to the South Coast AQMD in accordance Rule 218.2, as applicable.
[Rule 204, 218.2]
22. As applicable pursuant to Rule 218.2, in the event of a scheduled shutdown of the CEMS, the operator shall notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 96 hours prior to the scheduled CEMS shutdown, submit a written report to South Coast AQMD within 24 hours of CEMS shutdown indicating that the engine is non-operational and there are no emissions during the period of engine shutdown, and shall notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 8 hours prior to the scheduled CEMS restart. [Rule 204, 218.2]
23. As applicable pursuant to Rule 218.2, in the event that the engine does not operate for a minimum of 168 consecutive hours, as demonstrated pursuant to the provisions of Rule 218.2(e)(4), the owner or operator of the CEMS shall not be subject to Rule 218.2(e)(1) after zero emissions have been recorded for a minimum of 4 hours after the engine shutdown, provided that the owner or operator: maintains the CEMS operation pursuant to Rule 218.2(e)(1) to record zero emissions for a minimum of 4 hours after the engine shutdown, submits the notifications and report in accordance with Rule 218.2(i)(4), resumes CEMS operation and meet the requirements of Rule 218.2(e)(1) for a minimum of 4 hours before the engine resumes operation or at which time any emissions are generated; and conducts a calibration error test for each CEMS analyzer before any emissions are detected.
[Rule 204, 218.2]
92 of 153
Section H Page 25
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
24. The owner or operator shall conduct a source test within 180 days of initial start-up of this equipment operated with each fuel type, unless otherwise approved in writing by South Coast AQMD. The initial source tests shall be performed when the engine is operating at maximum, minimum, and average loads each for fuel landfill gas and landfill gas/natural gas blend and as indicated below, unless otherwise approved in writing by South Coast AQMD. Thereafter, subsequent source tests shall be performed in accordance with Rule 1110.2 and Rule 1150.1 as indicated below, in as-found operating conditions.
A. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) for the necessary test methods and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
B. Sampling facilities shall comply with South Coast AQMD "Guidelines for Construction of Sampling and Testing Facilities” pursuant to Rule 217.
C. The LAP contractor shall not conduct any pre-tests for compliance.
D. Pursuant to Rule 1150.1, the operator shall conduct source testing as follows, or pursuant to a valid and approved Rule 1150.1 Compliance Plan:
i. The operator shall conduct source testing for NMOC as hexane and methane annually.
Subsequent annual source tests shall be conducted no later than 45 days after the anniversary date of the initial source test. The initial source test shall be submitted to South Coast AQMD no later than 180 days after start-up and each succeeding complete annual source test report no later than 45 days after the anniversary date of the initial source test.
E. Pursuant to Rule 1110.2(f)(1), the operator shall conduct source testing as follows:
i. The operator shall conduct source testing for NOx, VOC reported as carbon, and CO at least once every two years from the date the previous source test, no later than the last day of the calendar month that the test is due, or every 8,760 operating hours, whichever occurs first.
ii. Frequency of subsequent source tests may be reduced to once every 3 years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a Rule 1110.2 source test is due, the source test shall be conducted by the end of 7 consecutive days or 15 cumulative days of resumed operation. An owner or operator of the engine shall keep sufficient operating records to demonstrate that it meets the requirements for extension of the source testing deadlines.
iii. The operator shall submit all source test reports, including a description of the equipment tested to South Coast AQMD within 60 days of completion of the test.
iv. Relative accuracy tests required by Rule 218.1, Rule 218.2, Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS for all applicable operating loads specified in Rule 1110.2(f)(1). Pursuant to Rule 218.3 as applicable , if the engine is not operating or generating emissions when a RATA is due, the RATA shall be performed within 14 days after the engine is restarted and resumes normal operation.
v. South Coast AQMD shall be notified of the scheduled source test date at least 30 days prior to conducting a source test. If after 30 days’ notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance 93 of 153
Section H Page 26
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
test, the engine operator shall notify the Executive Officer as soon as possible of any delay in the original test date, either by providing at least seven days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Executive Officer by mutual agreement.
vi. Source tests shall be conducted at least 40 operating hours or at least 1 week after any engine servicing or tuning.
vii. The LAP contractor shall conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady -state condition unless it is the normal operation. In addition, the LAP contractor shall co nduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load (or the maximum load that can be practically achieved during the test); and at actual minimum load, excluding idle (or the minimum load that can be practically achieved during the test).
vii. If an emission exceedance is found during any of the three phases of the test, that phase shall be completed and reported. An operator shall correct the exceedance, and the source test shall be immediately resumed.
F. Pursuant to Title V Periodic Monitoring Guidelines, the operator shall conduct source testing of each emission limit identified with a Rule 1303(a)(1)BACT or Rule 1303(a)(1)BACT/LAER tag (See Emissions and Requirements section below) at least once every 5 years. [Rule 204, 217, 218.2, 218.3, 304, 1110.2, 1150.1, 3004(a)(4)]
25. A source test protocol shall be submitted to South Coast AQMD at least 60 days before the scheduled test date and shall be approved in writing by South Coast AQMD before the test commences or a valid previously South Coast AQMD approved protocol may be used for recurring source test. If the operator submits the protocol by the required date, and the Executive Officer takes longer than 60 days to approve the protocol, the operator shall be allowed the additional time needed to conduct the test. At a minimum, the source test protocol should include the following, unless otherwise approved in writing by South Coast AQMD:
A. The name, address, and phone number of the unit operator and the South Coast AQMD-approved source testing contractor that will conduct the test(s).
B. The application and permit number(s).
C. A copy of the current valid approved permit(s).
D. The current emission limits.
E. A description of the equipment to be tested. Include a process schematic indicating sampling locations/ports, and sampling duct/stack dimensions along with upstream and downstream flow disturbances (e.g., elbows, tees, and fans).
F. A brief process description.
G. Operating conditions under which the test will be performed, including flow rate, temperature, pressure, number of tests to be conducted, operating loads, and required minimum sampling times.
H. A description of the sampling and analytical methods for each constituent measured.
94 of 153
Section H Page 27
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
I. Complete calculations for flow rates, concentrations, emission rates, and efficiencies.
J. A description of the calibration and quality assurance procedures.
K. A description of the parameters to be measured in accordance with the Inspection & Monitoring (I&M) plan requirements of Rule 1110.2, as applicable.
L. Copy of LAP approval for methods being used in the source test.
M. A statement determining that the testing laboratory qualifies as an “independent testing laboratory ” under Rule 304 (no conflict of interest), signed by the responsible authority. [Rule 204, 217, 304, 1110.2]
26. An owner or operator shall submit all source test results in a source test report, including a description of the equipment tested, to the South Coast AQMD Waste Management Permitting Unit in accordance with Rule 1110.2 and Rule 1150.1 and the source test report submittal deadlines indicated in the conditions above. The source test report shall include, but not be limited to the following, unless otherwise approved in writing by South Coast AQMD:
A. Fuel flow rate for each fuel or fuel blend used during the source test, (standard cubic feet per minute).
B. Exhaust gas flow rate for each engine load and each fuel or fuel blend used during the source test (standard cubic feet per minute).
C. Higher heating value (HHV) of each fuel or fuel blend used during the source test (Btu/scf).
D. Methane content of each fuel or fuel blend used during the source test (single load) (percent by volume) and at outlet of air pollution control (APC) (lb/hr, ppmvd and ppmvd @15% O2, destruction efficiency by weight).
E. Total non-methane organic compounds (TNMOC)/VOC at inlet for each fuel or fuel blend used during the source test (single load) and outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @3% O2, destruction efficiency by weight).
F. Carbon monoxide at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2.
G. Oxides of nitrogen at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2).
H. Carbon dioxide of each fuel or fuel blends used during the source test and outlet of APC (lb/hr, ppmvd, percent by volume).
I. Total particulates/PM10 at outlet of APC (grains/dscf, g/bhp-hr, lb/hour).
J. Total reduced sulfur, as H2S and speciated sulfur compounds of landfill gas (single load) (ppmv).
K. Total siloxanes (organic silicon compounds) of landfill gas and at outlet of engine and outlet of APC (ppmv).
L. Aldehydes of each fuel or fuel blend used during the source test and at outlet of APC (initial test only) (ppmv).
M. Speciated organics, including, but not limited to, Rule 1150.1 Table 1 Carcinogenic and Toxic Air Contaminants of each fuel or fuel blend used during the source tests and outlet of APC only (ppmv).
N. Oxygen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
O. Nitrogen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
P. Moisture content of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
Q. Temperature at inlet and outlet of engine and outlet of APC (Fahrenheit).
The operator shall comply with all general testing, reporting, and recordkeeping requirements in Sections E and K of this permit.
[Rule 204, 1110.2, 1150.1]
95 of 153
Section H Page 28
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
29. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 1110.2, 1150.1, 3004(a)(4)]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the followin g Rules and Regulations:
CO: 250 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT CO: 610 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ CO: 16.92 lb/hr, Rule 1303(b)(2) Offsets
NOx: 11 ppmvd @15% O2, dry Rule 1110.2, Rule 1303(a)(1) BACT NOx: 150 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ NOx: 1.22 lb/hr, Rule 1303(b)(2) Offsets
PM: Rule 404, See appendix B for emission limits
PM10: 0.066 grams/bhp-hr, Rule 1303(a)(1) BACT, Rule 1303(b)(2) Offsets PM/PM10: 0.61 lb/hr, Rule 1303(b)(2) Offsets
NMOC: 20 ppmvd as hexane @3% O2 or 98% by weight reduction, Rule 1150.1, 40 CFR 62 Subpart F, 40 CFR 63 Subpart AAAA
VOC: 30 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT VOC: 1.16 lb/hr as methane, Rule 1303(b)(2) Offsets
VOC: 80 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ Sulfur: 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER.
Sulfur: 85 ppmv as H2S in LFG inlet, averaged daily, Rule 1303(a)(1) BACT/LAER 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER, Rule 1303(b)(2) Offsets
SOx: 0.84 lb/hr, Rule 1303(b)(2) Offsets
96 of 153
Section H Page 29
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595662
Granted as of: TBD
Equipment Description:
Landfill Gas to Energy System No. 4 consisting of:
1. Pretreated Landfill Gas (LFG) Supply Line.
2. Internal Combustion Engine, No. 4, GE Jenbacher, Model J620 GS-F21, Landfill Gas and Natural Gas Fueled, Non-Emergency, Four Cycle, Twenty Cylinders, Lean Burn, Turbocharged and intercooled, rate at 4,183 bhp, driving an Electric Generator with a Gross Output of 3.03 MW.
3. Engine exhaust system vented to one Air Pollution Control System No. 4 (under Application No. 595666 or subsequent).
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. This engine shall be operated in compliance with all applicable provisions of Rule 218.2, Rule 218.3, Rule 431.1, Rule 1110.2, Rule 1150.1, NSPS 40 CFR Part 60 Subpart JJJJ, and NESHAP 40 CFR Part 63 Subpart ZZZZ.
[Rule 204, 218.2, 218.3, 431.1, 1110.2, 1150.1, 40 CFR part 60 Subparts JJJJ, CFR 40 Part 63 Subparts ZZZZ
5. This equipment shall not be operated unless its exhaust is vented to an air pollution control system which is in operation in accordance with the air pollution control system’s valid Permit to Construct or Operate issued by the South Coast AQMD.
[Rule 204]
6. This equipment shall be fueled on landfill gas (LFG) only or LFG with natural gas augmentation (landfill gas/natural gas blend).
[Rule 204]
7. A continuous flow indicating and recording device shall be installed in the LFG Supply Line and Natural Gas Supply Line to the engine to measure and record the volumetric flow rate of LFG and Natural Gas, respectively, (in standard cubic feet per minute) being supplied to each engine. The recording device shall be capable of recording gas flow at least every 15 minutes.
[Rule 204, 1150.1
8. The total heat input rate for the fuel burned in this engine shall not exceed 26.34 MMBtu per hour (HHV), as rated at standard temperature and pressure. The operator shall maintain an electronic data acquisition system or 97 of 153
Section H Page 30
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
other electronic log to record the average hourly LFG flow rate and Natural Gas flow rate based on readings taken every 15-minute interval. The high heating value (HHV) of the LFG shall be analyzed and recorded at least once per week. The total heat input rate (MMBtu per hour) shall be calculated based on the average hourly flow rate of LFG and natural gas, and the HHV of the LFG and natural gas. [Rule 1303(b)(1), 1303(b)(2) Offset]
9. Gas quality parameters, including but not limited to LFG HHV and methane percent, shall be analyzed and recorded using an instrument and/or method approved by the South Coast AQMD. [Rule 204]
10. The facility monthly average landfill gas usage by the engine shall be 90% or more, based on the higher heating value of the fuels used. The calculation of the monthly facility biogas use percentage may exclude natural gas fired during: any electrical outage at the facility; and a Stage 2 or higher electrical emergencies called by the California Independent System Operator Corporation.
[Rule 1110.2]
11. The emissions from this engine (inclusive of the associated air pollution control system) shall not exceed the following limits, except during periods of engine start-up, until sufficient operating temperatures are reached for proper operation of the emission control equipment or for the tuning of the engine and/or emission control equipment and an engine shutdown period. The start-up and shutdown periods shall not exceed 30 minutes.
Pollutant Emission Limit
Volatile Organic Compounds (VOC) 30 ppmv@15% O2 Dry
Oxides of Nitrogen (NOx) 11 ppmv@15% O2 Dry
Carbon Monoxide (CO) 250 ppmv@15% O2 Dry
NOx and CO emissions shall be averaged over a fixed-interval of one hour for engines equipped with a continuous emissions monitoring system. VOC shall be averaged over the sampling time required by the test method.
[Rule 1110.2]
12. This equipment shall reduce non-methane organic compounds (NMOC) by at least 98 percent by weight or reduce the outlet NMOC concentration to less than 20 ppmv, dry basis as hexane at 3 percent oxygen. [Rule 1150.1, 40 CFR part 62 Subpart F, 40 CFR part 63 subpart AAAA]
13. This equipment shall reduce the outlet methane concentration to less than 3000 ppmv, dry basis, corrected to 15 percent oxygen.
[Rule 1150.1]
14. A continuous emission monitoring system (CEMS) shall be installed, operated, and maintained to measure the engine exhaust concentration for NOx and O2, on a dry basis. In addition, the system shall convert the actual NOx concentration to a corrected NOx concentration at 15% O2 and continuously record the stack NOx concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall b e approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
98 of 153
Section H Page 31
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The operator shall apply for, obtain, and maintain a valid Inspection and Maintenance Plan (I&M) Plan or shall install, operate, and maintain a continuous emission monitoring system (CEMS) that measures the engine exhaust concentration for CO, on a dry basis. If a CEMS for CO is installed, the system shall convert the actual CO concentration to a corrected CO concentration at 15% O2 and continuously record the stack CO concentration at 15% O2. This monitoring system shall comply with the requirements of South Coast AQMD Rule 218.2 and Rue 218.3. Prior to installation, this monitoring system shall be approved in writing by the South Coast AQMD. The CEMS shall be maintained and operated in accordance with CEMS final certification letter, approved in writing by the South Coast AQMD. This monitoring system shall comply with the re quirements of South Coast AQMD Rule 218.2 and Rule 218.3, pursuant to the implementation schedules specified by the respective rules.
[Rule 218.2, 218.3 1110.2, 3004(a)(4) Periodic Monitoring, 40 CFR 64]
16. This engine shall be operated in compliance with all applicable monitoring, testing, recordkeeping, and reporting requirements of Rule 1110.2 (f)(1), including but not limited to:
A. The operator shall install and maintain an operational non-resettable totalizing time meter on the engine (display reading shall be readily available) to determine the engine elapsed operating time.
B. Conduct source testing for NOx, VOC, reported as carbon, and CO concentration in ppm by volume, corrected to 15% oxygen on dry basis, at least once every two years, or every 8,760 operating hours, whichever occurs first. Relative accuracy tests required by Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS. The Source test frequency may be reduced to once every three years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a source test is due, the source test shall be conducted by the end of seven consecutive days or 15 cumulative days of resumed operation.
Conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady-state condition unless it is the normal operation. In addition, conduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load, or the maximum load that can be practically achieved during the test, and; at actual minimum load, excluding idle, or the minimum load that can be practically achieved during the test.
The operator shall use only a source test contractor that is approved by the Executive Officer under the South Coast AQMD Laboratory approval program (LAP) for the necessary test methods. The operator shall comply with the procedures stated in Rule 1110.2 (f)(1)(C)(iv) through (vii), regarding the submittal of source test protocol, source test reports and utilities for sampling and testing equipment.
C. Maintain a monthly operating engine log that includes:
i. Total hours of operation,
ii. Type of gaseous fuel,
iii. Fuel consumption (standard cubic feet of gas, and MMBtu), and iv. Cumulative hours of operation since the last source test required in subparagraph (f)(1)(C) of Rule 1110.2.
The log shall be made available upon request.
D. The operator shall comply with the reporting requirements of Rule 1110.2 (f)(1)(H)(i) through (iii), pertaining to any equipment breakdown that results in emissions in excess of rule or permit emissions limits.
[Rule, 204, 1110.2]
99 of 153
Section H Page 32
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
17. An adequate number of sampling port(s) and welded nipples with caps with safe access shall be installed and maintained at the inlet gas line(s) to the engine to allow the collection of each fuel gas (landfill gas and landfill gas/natural gas blend, as applicable) for samples in accordance with Rule 217 and South Coast AQMD’s approval.
[Rule 204, 217, 431.1, 1150.1]
18. An adequate number of sampling ports shall be maintained in the exhaust stack at least one -half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g., elbows, tees and fans). Each sampling port shall consist of a four -inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
19. Operation of this equipment shall not result in the release of LFG into the atmosphere. Any breakdown or malfunction which results in emissions of LFG shall be reported to the South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be undertaken to correct the problem and prevent further emissions into the atmosphere.
[Rule 204, 402, 430, 1150.1]
20. The owner or operator of the CEMS shall notify the South Coast AQMD by calling 1 -800-CUT-SMOG if the concentration level and/or emission rate, as applicable, is in excess of the emission limit(s) within 24 hours or the next working day after such occurrence.
[Rule 204, 218.2]
21. The operator shall comply with Rule 218.2 CEMS failure and/or shutdown requirements. Pursuant to Rule 218.2, a notification shall be submitted for CEMS failure and/or shutdown exceeding 24 hours. Shutdown events shall not exceed 96 hours, except as extended pursuant to Rule 218.2, as applicable. The operator shall log the time, date, duration, cause of the CEMS failure, description of the occurrence, and description of any corrective action taken for each failure and/or shutdown event, and report to the South Coast AQMD in accordance Rule 218.2, as applicable.
[Rule 204, 218.2]
22. As applicable pursuant to Rule 218.2, in the event of a scheduled shutdown of the CEMS, the operator shall notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 96 hours prior to the scheduled CEMS shutdown, submit a written report to South Coast AQMD within 24 hours of CEMS shutdown indicating that the engine is non-operational and there are no emissions during the period of engine shutdown, and sh all notify South Coast AQMD by calling 1-800-CUT-SMOG, at least 8 hours prior to the scheduled CEMS restart. [Rule 204, 218.2]
23. As applicable pursuant to Rule 218.2, in the event that the engine does not operate for a minimum of 168 consecutive hours, as demonstrated pursuant to the provisions of Rule 218.2(e)(4), the owner or operator of the CEMS shall not be subject to Rule 218.2(e)(1) after zero emissions have been recorded for a minimum of 4 hours after the engine shutdown, provided that the owner or operator: maintains the CEMS operation pursuant to Rule 218.2(e)(1) to record zero emissions for a minimum of 4 hours after the engine shutdown, submits the notifications and report in accordance with Rule 218.2(i)(4), resumes CEMS operation and meet the requirements of Rule 218.2(e)(1) for a minimum of 4 hours before the engine resumes operation or at which time any emissions are generated; and conducts a calibration error test for each CEMS analyzer before any emissions are detected.
[Rule 204, 218.2]
100 of 153
Section H Page 33
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
24. The owner or operator shall conduct a source test within 180 days of initial start-up of this equipment operated with each fuel type, unless otherwise approved in writing by South Coast AQMD. The initial source tests shall be performed when the engine is operating at maximum, minimum, and average loads each for fuel landfill gas and landfill gas/natural gas blend and as indicated below, unless otherwise approved in writing by South Coast AQMD. Thereafter, subsequent source tests shall be performed in accordance with Rule 1110.2 and Rule 1150.1 as indicated below, in as-found operating conditions.
A. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) for the necessary test methods and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
B. Sampling facilities shall comply with South Coast AQMD "Guidelines for Construction of Sampling and Testing Facilities” pursuant to Rule 217.
C. The LAP contractor shall not conduct any pre-tests for compliance.
D. Pursuant to Rule 1150.1, the operator shall conduct source testing as follows, or pursuant to a valid and approved Rule 1150.1 Compliance Plan:
i. The operator shall conduct source testing for NMOC as hexane and methane annually.
Subsequent annual source tests shall be conducted no later than 45 days after the anniversary date of the initial source test. The initial source test shall be submitted to South Coast AQMD no later than 180 days after start-up and each succeeding complete annual source test report no later than 45 days after the anniversary date of the initial source test.
E. Pursuant to Rule 1110.2(f)(1), the operator shall conduct source testing as follows:
i. The operator shall conduct source testing for NOx, VOC reported as carbon, and CO at least once every two years from the date the previous source test, no later than the last day of the calendar month that the test is due, or every 8,760 operating hours, whichever occurs first.
ii. Frequency of subsequent source tests may be reduced to once every 3 years if the engine has operated less than 2,000 hours since the last source test. If the engine has not been operated before the date a Rule 1110.2 source test is due, the source test shall be conducted by the end of 7 consecutive days or 15 cumulative days of resumed operation. An owner or operator of the engine shall keep sufficient operating records to demonstrate that it meets the re quirements for extension of the source testing deadlines.
iii. The operator shall submit all source test reports, including a description of the equipment tested to South Coast AQMD within 60 days of completion of the test.
iv. Relative accuracy tests required by Rule 218.1, Rule 218.2, Rule 218.3 or 40 CFR Part 75 Subpart E shall satisfy this requirement for those pollutants monitored by a CEMS for all applicable operating loads specified in Rule 1110.2(f)(1). Pursuant to Rule 218.3 as applicable, if the engine is not operating or generating emissions when a RATA is due, the RATA shall be performed within 14 days after the engine is restarted and resumes normal operation.
v. South Coast AQMD shall be notified of the scheduled source test date at least 3 0 days prior to conducting a source test. If after 30 days’ notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance 101 of 153
Section H Page 34
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
test, the engine operator shall notify the Executive Officer as soon as possible of any delay in the original test date, either by providing at least seven days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Executive Officer by mutual agreement.
vi. Source tests shall be conducted at least 40 operating hours or at least 1 week after any engine servicing or tuning.
vii. The LAP contractor shall conduct source testing for at least 30 minutes during normal operation (actual duty cycle). This test shall not be conducted under a steady -state condition unless it is the normal operation. In addition, the LAP contractor shall co nduct source testing for NOx and CO emissions for at least 15 minutes at: an engine’s actual peak load (or the maximum load that can be practically achieved during the test); and at actual minimum load, excluding idle (or the minimum load that can be practically achieved during the test).
vii. If an emission exceedance is found during any of the three phases of the test, that phase shall be completed and reported. An operator shall correct the exceedance, and the source test shall be immediately resumed.
F. Pursuant to Title V Periodic Monitoring Guidelines, the operator shall conduct source testing of each emission limit identified with a Rule 1303(a)(1)BACT or Rule 1303(a)(1)BACT/LAER tag (See Emissions and Requirements section below) at least once every 5 years. [Rule 204, 217, 218.2, 218.3, 304, 1110.2, 1150.1, 3004(a)(4)]
25. A source test protocol shall be submitted to South Coast AQMD at least 60 days before the scheduled test date and shall be approved in writing by South Coast AQMD before the test commences or a valid previously South Coast AQMD approved protocol may be used for recurring source test. If the operator submits the protocol by the required date, and the Executive Officer takes longer than 60 days to approve the protocol, the operator shall be allowed the additional time needed to conduct the test. At a minimum, the source test protocol should include the following, unless otherwise approved in writing by South Coast AQMD:
A. The name, address, and phone number of the unit operator and the South Coast AQMD-approved source testing contractor that will conduct the test(s).
B. The application and permit number(s).
C. A copy of the current valid approved permit(s).
D. The current emission limits.
E. A description of the equipment to be tested. Include a process schematic indicating sampling locations/ports, and sampling duct/stack dimensions along with upstream and downstream flow disturbances (e.g., elbows, tees, and fans).
F. A brief process description.
G. Operating conditions under which the test will be performed, including flow rate, temperature, pressure, number of tests to be conducted, operating loads, and required minimum sampling times.
H. A description of the sampling and analytical methods for each constituent measured.
102 of 153
Section H Page 35
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
I. Complete calculations for flow rates, concentrations, emission rates, and efficiencies.
J. A description of the calibration and quality assurance procedures.
K. A description of the parameters to be measured in accordance with the Inspection & Monitoring (I&M) plan requirements of Rule 1110.2, as applicable.
L. Copy of LAP approval for methods being used in the source test.
M. A statement determining that the testing laboratory qualifies as an “inde pendent testing laboratory” under Rule 304 (no conflict of interest), signed by the responsible authority. [Rule 204, 217, 304, 1110.2]
26. An owner or operator shall submit all source test results in a source test report, including a description of the equipment tested, to the South Coast AQMD Waste Management Permitting Unit in accordance with Rule 1110.2 and Rule 1150.1 and the source test report submittal deadlines indicated in the conditions above . The source test report shall include, but not be limited to the following, unless otherwise approved in writing by South Coast AQMD:
A. Fuel flow rate for each fuel or fuel blend used during the source test, (standard cubic feet per minute).
B. Exhaust gas flow rate for each engine load and each fuel or fuel blend used during the source test (standard cubic feet per minute).
C. Higher heating value (HHV) of each fuel or fuel blend used during the source test (Btu/scf).
D. Methane content of each fuel or fuel blend used during the source test (single load) (percent by volume) and at outlet of air pollution control (APC) (lb/hr, ppmvd and ppmvd @15% O2, destruction efficiency by weight).
E. Total non-methane organic compounds (TNMOC)/VOC at inlet for each fuel or fuel blend used during the source test (single load) and outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @3% O2, destruction efficiency by weight).
F. Carbon monoxide at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2.
G. Oxides of nitrogen at outlet of APC (lb/hr, g/bhp-hr, ppmvd, ppmvd @15% O2).
H. Carbon dioxide of each fuel or fuel blends used during the source test and outlet of APC (lb/hr, ppmvd, percent by volume).
I. Total particulates/PM10 at outlet of APC (grains/dscf, g/bhp-hr, lb/hour).
J. Total reduced sulfur, as H2S and speciated sulfur compounds of landfill gas (single load) (ppmv).
K. Total siloxanes (organic silicon compounds) of landfill gas and at outlet of engine and outlet of APC (ppmv).
L. Aldehydes of each fuel or fuel blend used during the source test and at outlet of APC (initial test only) (ppmv).
M. Speciated organics, including, but not limited to, Rule 1150.1 Table 1 Carcinogenic and Toxic Air Contaminants of each fuel or fuel blend used during the source tests and outlet of APC only (ppmv).
N. Oxygen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
O. Nitrogen of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
P. Moisture content of fuel or fuel blends used during the source test and outlet of APC (percent by volume).
Q. Temperature at inlet and outlet of engine and outlet of APC (Fahrenheit).
The operator shall comply with all general testing, reporting, and recordkeeping requirements in Sections E and K of this permit.
[Rule 204, 1110.2, 1150.1]
103 of 153
Section H Page 36
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
27. This Permit to Construct shall expire if construction of this equipment is not completed with in one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
29. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 1110.2, 1150.1, 3004(a)(4)]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
CO: 250 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT CO: 610 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ CO: 16.92 lb/hr, Rule 1303(b)(2) Offsets
NOx: 11 ppmvd @15% O2, dry Rule 1110.2, Rule 1303(a)(1) BACT NOx: 150 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ NOx: 1.22 lb/hr, Rule 1303(b)(2) Offsets
PM: Rule 404, See appendix B for emission limits
PM10: 0.066 grams/bhp-hr, Rule 1303(a)(1) BACT, Rule 1303(b)(2) Offsets PM/PM10: 0.61 lb/hr, Rule 1303(b)(2) Offsets
NMOC: 20 ppmvd as hexane @3% O2 or 98% by weight reduction, Rule 1150.1, 40 CFR 62 Subpart F, 40 CFR 63 Subpart AAAA
VOC: 30 ppmvd @15% O2, Rule 1110.2, Rule 1303(a)(1) BACT VOC: 1.16 lb/hr as methane, Rule 1303(b)(2) Offsets
VOC: 80 ppmv @15% O2, dry, 40 CFR 60 subpart JJJJ, 40 CFR 63 Subpart ZZZZ Sulfur: 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER.
Sulfur: 85 ppmv as H2S in LFG inlet, averaged daily, Rule 1303(a)(1) BACT/LAER 60 ppmv as H2S in LFG inlet, averaged monthly, Rule 1303(a)(1) BACT/LAER, Rule 1303(b)(2) Offsets
SOx: 0.84 lb/hr, Rule 1303(b)(2) Offsets
104 of 153
Section H Page 37
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 565663
Granted as of: TBD
Equipment Description:
Air Pollution Control System No. 1 consisting of:
1. Oxidation Catalyst, Johnson Matthey or equivalent, Model No. SC09 or equivalent, with one layer of corrugated metallic foil type platinum microporous catalyst or equivalent modules, each Approximately 1’ L. x 1’ W. x 0’ -
3.5” H., with a total volume of approximately 7.3 cubic ft.
2. Aqueous Ammonia Injection System.
3. Selective Catalytic Reduction (SCR) System with:
A. Catalyst Guard Bed layer, Johnson Matthey SW55 wash-coat type or equivalent, approximately 1’ L. x 1’ W. x 0’-4” H., with approximately 7 cubic feet volume.
B. SCR Catalyst, Johnson Matthey SW55 or equivalent consisting of two layers of honeycomb -type ceramic type microporous catalyst or equivalent modules, each approximately 1 ’ L. x 1’ W. x 1’ H., with a total volume of approximately 47 cubic ft.
C. Ammonia Slip Catalyst, Johnson Matthey DW3140 or equivalent, consisting of one layer of honeycomb-type mixed metal ceramic microporous catalyst, modules, each 1’ L. x 1’ W. x 0’-6” H, with a total volume of approximately 12 cubic ft.
4. Exhaust Stack, 40’ H. x 2’ Dia.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. The NOx and CO monitoring and ammonia injection system shall be in full operation whenever the selecti ve catalytic reduction (SCR) system is in operation.
[Rule 204]
5. This air pollution control system shall be in full operation whenever the internal combustion engine it is venting is in operation, unless otherwise noted in this permit or the internal combustion engine permit (A/N 595659 or subsequent).
[Rule 204]
6. This equipment shall be inspected and maintained per manufacturer’s specifications. Records of the inspection and maintenance of this equipment shall be maintained and be retained for at least five years and be made available the South Coast AQMD personnel upon request.
[Rule 204]
105 of 153
Section H Page 38
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
7. During the first catalyst replacement and/or overhaul during which the SCR is shutdown, the operator shall sample each catalyst type (Oxidation, SCR, and Ammonia) and shall analyze catalyst activity/health, unless otherwise approved in writing by South Coast AQMD. The results shall be submitted to the South Coast AQMD (Attention Waste Management Permitting) within 60 days of the sampling event. [Rule 204]
8. An adequate number of sampling ports shall be installed and maintained at the inlet and outlet of the air pollution control system in accordance with Rule 217 and South Coast AQMD’s approval. [Rule 204, 217]
9. An adequate number of sampling ports shall be installed and maintained in the exhaust stack at least one-half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g. elbows, tees and fans). Each sampling port shall consist of a four -inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon written approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
10. The operator shall install and maintain temperature measuring and recording system(s) to accurately measure and record the temperature in degrees Fahrenheit at the inlet and outlet of the oxidation catalyst, SCR catalyst and ammonia catalyst. The temperatures shall be continuously measured and recorded. The temperature measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least once every twelve months. The temperature sensors shall be inspected and/or cleaned every six months. Records shall be maintained indicating each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
11. The minimum temperature of the engine exhaust at the inlet of the SCR unit shall be at least 550 degrees Fahrenheit. The period during which the temperature of exhaust gases entering the SCR Unit is less than 550 degrees Fahrenheit shall not exceed 30 minutes for each cold start-up and shutdown. [Rule 204, 1110.2]
12. The maximum temperature of the exhaust gases entering the SCR unit shall not exceed 860 degrees Fahrenheit. [Rule 204]
13. The operator shall install and maintain differential pressure measuring and recording system(s) t o accurately indicate the differential pressure in inches of water column across the SCR catalyst and across the oxidation catalyst. The differential pressure shall be continuously measured and recorded. The differential pressure measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least once every twelve months. The differential pressure sensors shall be inspected and/or cleaned every six months. Records shall be maintained showing each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
14. The differential pressure across each catalyst (the SCR catalyst and the oxidation catalyst) shall not exceed 5 inches of water column
[Rule 204]
106 of 153
Section H Page 39
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The ammonia injection system shall be operated only when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit.
[Rule 204]
16. The ammonia injection system shall be equipped with a fully modulated automated control system tuned to minimize ammonia slip.
[Rule 204]
17. The one-hour average ammonia concentration at the outlet of the SCR unit shall not exceed 5 ppmvd at 15% oxygen when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT/LAER]
18. The fifteen-minute average NOx concentration at the outlet of the SCR unit shall not exceed 11 ppmv corrected to 15 percent oxygen when the SCR inlet temperature is above 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT]
19. The operator shall install and maintain an ammonia flow rate measuring and recording system to accurately indicate and record the ammonia injection flow rate to the selective catalytic reduction system. [Rule 204]
20. The operator shall install and maintain a NOx (NO) analyzer to measure SCR inlet NO concentration and shall calibrate the analyzer at least annually in accordance with the manufacturer’s specifications. [Rule 204]
21. Prior to the installation and operation of an ammonia (NH3) CEMS that has been approved or certified, when the SCR is in operation, the operator shall estimate the ammonia concentration in the SCR outlet, based on one -hour average corrected to 15% oxygen from the ammonia injection flow rate, and the SCR inlet and outlet NOx emission rates and limit the estimated ammonia concentration in the SCR outlet to a maximum of 5 ppmv corrected to 15% oxygen. This analysis shall no longer be required after the installation and operation of an NH3 CEMS.
[Rule 204]
22. A data acquisition system or its equivalent shall be installed and maintained to record the following:
A. The date, time, and hours of operation.
B. The 24-hours and one-hour average NOx, and CO concentrations, in ppmv corrected to 15% O2 dry basis, at the inlet and outlet of the SCR system.
C. The exhaust gas inlet and outlet temperatures to the oxidation catalyst and the SCR catalyst.
D. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
E. The total time in minutes from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit.
F. The ammonia injection flow rate, pounds per hour.
G. The molar ratio of the ammonia flowrate to the NOx flowrate. (No longer required after the installation and operation of an NH3 CEMS).
H. The estimated ammonia concentration at the outlet of the SCR unit exhaust stack, . [Rule 204, Rule 3004 (a)(4)]
23. At least once each quarter after the initial start-up siloxane test results from the landfill gas conditioning and supply system have been received, the operator shall monitor and record SCR performance pa rameters, and perform a correlation analysis between these parameters and the siloxane levels in the landfill gas. Performance parameters include but are not limited to NOx emission readings from the CEMS units, differential pressure 107 of 153
Section H Page 40
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
across the oxidation catalyst and SCR catalyst, ammonia injection flow rate, and the ammonia to NOx molar ratio. This analysis shall no longer be required after the installation and operation of an NH3 CEMS. [Rule 204]
24. The ammonia slip source tests shall be conducted in accordance with the following:
A. Source testing shall be conducted concurrently with the required initial source testing of the engine within 180 days after initial start-up of this equipment, then subsequently at least once every six months, unless otherwise approved in writing by South Coast AQMD.
B. The ammonia slip test shall be conducted using South Coast AQMD approved methods and results averaged over 1 hour.
C. All source tests shall be conducted in accordance with a valid South Coast AQMD approved test protocol.
D. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) as applicable and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
E. The contractor shall not conduct any pre-tests for compliance.
F. A source test protocol shall be submitted for approval no later than 60 days prior to a scheduled source test date or a valid previously South Coast AQMD approved protocol may be used for recurring source test.
G. No later than 14 days prior to conducting a source test, South Coast AQMD shall be notified of the scheduled source test date. If a scheduled source test is delayed, South Coast AQMD shall be notified within 24 hours from the time that an owner or operator knew of the delay. South Coast AQMD shall be notified at least 7 days prior to the rescheduled date of the source test or arrange a rescheduled date with South Coast AQMD by mutual agreement.
H. An owner or operator shall submit the source test report, including a description of the unit tested, to the South Coast AQMD within 60 days of completion of the source test.
I. Records of the ammonia slip tests shall be kept for at least five years and be made available to South Coast AQMD personnel upon request.
J. Ammonia slip source tests are not required when a South Coast AQMD certified ammonia CEMS is operational.
[Rule 204]
25. No later than 36 months of the date the South Coast AQMD notifies the facility of South Coast AQMD having published a Quality Assurance/Quality Control (QA/QC) Plan/certification procedures for NH3 CEMS, the NH3 CEMS shall be installed, operational, and certified by South Coast AQMD, unless otherwise approved by South Coast AQMD. The NH3 CEMS shall be installed and maintained in accordance with the following:
A. NH3 concentration in ppmv averaged over 1 hour.
B. Concentrations shall be corrected to 15 percent oxygen on a dry basis.
C. The NH3 CEMS shall be installed and maintained to continuously record the parameter being measured.
D. Continuous operation of the monitoring system is not required when required calibration, maintenance, or repair activities are performed in accordance with manufacturer's recommendations. The operator shall take all reasonable actions to minimize the time required to perform such activities. In no event, shall any such activities exceed 96 consecutive hours for any one calibration, maintenance, or repair episode.
E. As an alternative to installing, operating, and certifying an NH3 CEMS no later than 36 months from notification of publication of the NH3 CEMS QA/QC Plan/certification, the operator shall:
I. Continuously monitor and record:
a. The date, time, and hours of operation of the engine and this equipment. 108 of 153
Section H Page 41
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
b. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the inlet to the SCR catalyst (from the SCR controller/analyzer), if available.
c. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the SCR catalyst (from the SCR controller/analyzer unit with NOx (NO) monitor).
d. The 24-hour, 1-hour, and 15-minute averages of NOx concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the air pollution control system (from the NOx CEMS).
e. The temperature at the inlet and outlet of the SCR catalyst and the ammonia catalyst. f. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
g. The date, time, and duration of operation from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit (or manufacturer specified minimum SCR inlet temperature, if different).
h. The molar ratio of the ammonia flowrate to the NOx flowrate. i. Ammonia injection flow rate.
j. Gas flow rate to the SCR in scfm.
II. Submit an Ammonia Slip Compliance Plan subject to approval by South Coast AQMD, within 6 months of the date from notification of publication of the NH3 CEMS QA/QC Plan/ certification. The Ammonia Slip Compliance Plan submittal shall contain but not be limited to, unless otherwise approved by South Coast AQMD:
a. All monitoring records as required by Condition 25(E)(I). b. Calibration records of temperature, differential pressure, ammonia injection flow, and engine exhaust back pressure monitoring systems.
c. A detailed description of the proposed ammonia usage limitation based on a ratio limit, mass balance limit, and/or other operational parameter(s) to ensure ammonia slip will not exceed the ammonia emission limit established by the permit. d. A detailed description of the procedure used to develop the ammonia usage limitation including all supporting information such as monitoring and operating data and parameters, assumptions, estimates, correlations, equations used or developed, calculations; and the scientific/technical basis and rationale for the proposed procedure.
e. A detailed description of operating data and parameters that will be monitored to determine the ammonia usage limitation and the associated proposed recordkeeping procedures and formats of such data and parameters.
f. A detailed description of the procedure of how the ammonia usage limitation will be implemented into the SCR control/analyzer and ammonia injection system, and the procedure and format for how changes to the SCR control/analyzer and ammonia injection system are documented and retained.
g. A detailed description of the format, procedures, and schedule for recordkeeping and monitoring, sufficient to assure compliance.
h. A detailed description of the procedures for responding to, diagnosing and correcting breakdowns, faults, or malfunctions in the SCR control/analyzer and ammonia injection system.
i. A detailed description of the procedures for determining whether the ammonia usage during a breakdown, fault, or malfunction was within the parameter(s) proposed and/or approved in the Ammonia Slip Compliance Plan and how those values will be reported (missing data procedures).
109 of 153
Section H Page 42
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
j. A detailed description of procedures for identifying whether the proposed ammonia usage limitation is still representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
k. A detailed description of the proposed timeframe and procedures upon which the ammonia usage limitation will be periodically re-assessed if found to no longer be representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
III. If the Ammonia Slip Compliance Plan is assessed to be no longer representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit, pursuant to the procedures of Condition No. 25(II)(j) the operator shall, unless otherwise approved by South Coast AQMD:
a. Provide written notification to South Coast AQMD (Attn: Waste Management Permitting) that the Ammonia Slip Compliance Plan is no longer representative within 14 days from the date the operator has made the determination, and b. Install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 24 months from the date South Coast AQMD has been notified, or
c. Submit a revised Ammonia Slip Compliance Plan with information containing but no limited to the information identified in Condition No. 25(E)(II), unless otherwise approved by South Coast AQMD, no later than 60 days from the date South Coast AQMD has been notified.
[Rule 204, Rule 218.2, Rule 218.3]
26. Should the Ammonia Slip Compliance Plan not be approved by South Coast AQMD within 12 months from the date of submittal, the operator shall install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 36 months from the date the Ammonia Slip Compliance Plan was submitted to South Coast AQMD.
[Rule 204]
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to b e complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
110 of 153
Section H Page 43
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
29. All records required to demonstrate compliance with this permit shall be kept and maintained for at least five (5) years and shall be made available to South Coast AQMD personnel upon request. [Rule 204]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
NH3: 5 ppmv @15% O2, ammonia slip, one-hour average, Rule 1303(a)(1) BACT/LAER NH3: 0.21 lb/hr, ammonia slip, Rule 1303(b)(2) Offsets
111 of 153
Section H Page 44
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595664
Granted as of: TBD
Equipment Description:
Air Pollution Control System No. 2 consisting of:
1. Oxidation Catalyst, Johnson Matthey or equivalent, Model No. SC09 or equivalent, with one layer of corrugated metallic foil type platinum microporous catalyst or equivalent modules, each Approximately 1’ L. x 1’ W. x 0’ -
3.5” H., with a total volume of approximately 7.3 cubic ft.
2. Aqueous Ammonia Injection System.
3. Selective Catalytic Reduction (SCR) System with:
A. Catalyst Guard Bed layer, Johnson Matthey SW55 wash-coat type or equivalent, approximately 1’ L. x 1’ W. x 0’-4” H., with approximately 7 cubic feet volume.
B. SCR Catalyst, Johnson Matthey SW55 or equivalent consisting of two layers of honeycomb -type ceramic type microporous catalyst or equivalent modules, each approximately 1’ L. x 1’ W. x 1’ H., with a total volume of approximately 47 cubic ft.
C. Ammonia Slip Catalyst, Johnson Matthey DW3140 or equivalent, consisting of one layer of honeycomb-type mixed metal ceramic microporous catalyst, modules, each 1’ L. x 1’ W. x 0’ -6” H, with a total volume of approximately 12 cubic ft.
4. Exhaust Stack, 40’ H. x 2’ Dia.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. The NOx and CO monitoring and ammonia injection system shall be in full operation whenever the selective catalytic reduction (SCR) system is in operation.
[Rule 204]
5. This air pollution control system shall be in full operation whenever the internal combustion engine it is venting is in operation, unless otherwise noted in this permit or the internal combustion engine permit (A/N 5956 60 or subsequent).
[Rule 204]
6. This equipment shall be inspected and maintained per manufacturer’s specifications. Records of the inspection and maintenance of this equipment shall be maintained and be retained for at least five years and be made available the South Coast AQMD personnel upon request.
[Rule 204]
112 of 153
Section H Page 45
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
7. During the first catalyst replacement and/or overhaul during which the SCR is shutdown, the operator shal l sample each catalyst type (Oxidation, SCR, and Ammonia) and shall analyze catalyst activity/health, unless otherwise approved in writing by South Coast AQMD. The results shall be submitted to the South Coast AQMD (Attention Waste Management Permitting) within 60 days of the sampling event. [Rule 204]
8. An adequate number of sampling ports shall be installed and maintained at the inlet and outlet of the air pollution control system in accordance with Rule 217 and South Coast AQMD’s approval. [Rule 204, 217]
9. An adequate number of sampling ports shall be installed and maintained in the exhaust stack at least one-half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g. elbows, tees and fans). Each sampling port shall consist of a four-inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon written approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
10. The operator shall install and maintain temperature measuring and recording system(s) to accurately measure and record the temperature in degrees Fahrenheit at the inlet and outlet of the oxidation catalyst, SCR catalyst and ammonia catalyst. The temperatures shall be continuously measured and recorded. The temperature measuring devices shall be accurate to within plus or minus 5 percent and shall be cal ibrated at least once every twelve months. The temperature sensors shall be inspected and/or cleaned every six months. Records shall be maintained indicating each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
11. The minimum temperature of the engine exhaust at the inlet of the SCR unit shall be at least 550 degrees Fahrenheit. The period during which the temperature of exhaust gases entering the SCR Unit is less than 550 degrees Fahrenheit shall not exceed 30 minutes for each cold start-up and shutdown. [Rule 204, 1110.2]
12. The maximum temperature of the exhaust gases entering the SCR unit shall not exceed 860 degrees Fahrenheit. [Rule 204]
13. The operator shall install and maintain differential pressure measuring and recording system(s) to accurately indicate the differential pressure in inches of water column across the SCR catalyst and across the oxidation catalyst. The differential pressure shall be continuously measured and recorded. The differential pressure measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least once every twelve months. The differential pressure sensors shall be inspected and/or cleaned every six months. Records shall be maintained showing each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
14. The differential pressure across each catalyst (the SCR catalyst and the oxidation catalyst) shall not exceed 5 inches of water column
[Rule 204]
113 of 153
Section H Page 46
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The ammonia injection system shall be operated only when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit.
[Rule 204]
16. The ammonia injection system shall be equipped with a fully modulated automated control system tuned to minimize ammonia slip.
[Rule 204]
17. The one-hour average ammonia concentration at the outlet of the SCR unit shall not exceed 5 ppmvd at 15% oxygen when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT/LAER]
18. The fifteen-minute average NOx concentration at the outlet of the SCR unit shall not exceed 11 ppmv corrected to 15 percent oxygen when the SCR inlet temperature is above 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT]
19. The operator shall install and maintain an ammonia flow rate measuring and recording system to accurately indicate and record the ammonia injection flow rate to the selective catalytic reduction system. [Rule 204]
20. The operator shall install and maintain a NOx (NO) analyzer to measure SCR inlet NO concentration and shall calibrate the analyzer at least annually in accordance with the manufacturer’s specifications. [Rule 204]
21. Prior to the installation and operation of an ammonia (NH3) CEMS that has been approved or certified, when the SCR is in operation, the operator shall estimate the ammonia concentration in the SCR outlet, based on one -hour average corrected to 15% oxygen from the ammonia injection flow rate, and the SCR inlet and outlet NOx emission rates and limit the estimated ammonia concentration in the SCR outlet to a maximum of 5 ppmv corrected to 15% oxygen. This analysis shall no longer be required after the installation and operation of an NH3 CEMS.
[Rule 204]
22. A data acquisition system or its equivalent shall be installed and maintained to record the following:
A. The date, time, and hours of operation.
B. The 24-hours and one-hour average NOx, and CO concentrations, in ppmv corrected to 15% O2 dry basis, at the inlet and outlet of the SCR system.
C. The exhaust gas inlet and outlet temperatures to the oxidation catalyst and the SCR catalyst.
D. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
E. The total time in minutes from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit.
F. The ammonia injection flow rate, pounds per hour.
G. The molar ratio of the ammonia flowrate to the NOx flowrate. (No longer required after the installation and operation of an NH3 CEMS).
H. The estimated ammonia concentration at the outlet of the SCR unit exhaust stack, . [Rule 204, Rule 3004 (a)(4)]
23. At least once each quarter after the initial start-up siloxane test results from the landfill gas conditioning and supply system have been received, the operator shall monitor and record SCR performance parameters, and perform a correlation analysis between these parameters and the siloxane levels in the lan dfill gas. Performance parameters include but are not limited to NOx emission readings from the CEMS units, differential pressure 114 of 153
Section H Page 47
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
across the oxidation catalyst and SCR catalyst, ammonia injection flow rate, and the ammonia to NOx molar ratio. This analysis shall no longer be required after the installation and operation of an NH3 CEMS. [Rule 204]
24. The ammonia slip source tests shall be conducted in accordance with the following:
A. Source testing shall be conducted concurrently with the required initial source testing of the engine within 180 days after initial start-up of this equipment, then subsequently at least once every six months, unless otherwise approved in writing by South Coast AQMD.
B. The ammonia slip test shall be conducted using South Coast AQMD approved methods and results averaged over 1 hour.
C. All source tests shall be conducted in accordance with a valid South Coast AQMD approved test protocol.
D. Testing shall be conducted by an approved contractor under the South Coast AQMD Labor atory Approval Program (LAP) as applicable and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
E. The contractor shall not conduct any pre-tests for compliance.
F. A source test protocol shall be submitted for approval no later than 60 days prior to a scheduled source test date or a valid previously South Coast AQMD approved protocol may be used for recurring source test.
G. No later than 14 days prior to conducting a source test, South Coast AQMD shall be notified of the scheduled source test date. If a scheduled source test is delayed, South Coast AQMD shall be notified within 24 hours from the time that an owner or operator knew of the delay. South Coast AQMD shal l be notified at least 7 days prior to the rescheduled date of the source test or arrange a rescheduled date with South Coast AQMD by mutual agreement.
H. An owner or operator shall submit the source test report, including a description of the unit tested, to the South Coast AQMD within 60 days of completion of the source test.
I. Records of the ammonia slip tests shall be kept for at least five years and be made available to South Coast AQMD personnel upon request.
J. Ammonia slip source tests are not required when a South Coast AQMD certified ammonia CEMS is operational.
[Rule 204]
25. No later than 36 months of the date the South Coast AQMD notifies the facility of South Coast AQMD having published a Quality Assurance/Quality Control (QA/QC) Plan/certification procedures for NH3 CEMS, the NH3 CEMS shall be installed, operational, and certified by South Coast AQMD, unless otherwise approved by South Coast AQMD. The NH3 CEMS shall be installed and maintained in accordance with the following:
A. NH3 concentration in ppmv averaged over 1 hour.
B. Concentrations shall be corrected to 15 percent oxygen on a dry basis.
C. The NH3 CEMS shall be installed and maintained to continuously record the parameter being measured.
D. Continuous operation of the monitoring system is not required when required calibration, maintenance, or repair activities are performed in accordance with manufacturer's recommendations. The operator shall take all reasonable actions to minimize the time required to perform such activities. In no event, shall any such activities exceed 96 consecutive hours for any one calibration, maintenance , or repair episode.
E. As an alternative to installing, operating, and certifying an NH3 CEMS no later than 36 months from notification of publication of the NH3 CEMS QA/QC Plan/certification, the operator shall:
I. Continuously monitor and record:
a. The date, time, and hours of operation of the engine and this equipment. 115 of 153
Section H Page 48
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
b. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the inlet to the SCR catalyst (from the SCR controller/analyzer), if available.
c. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the SCR catalyst (from the SCR controller/analyzer unit with NOx (NO) monitor).
d. The 24-hour, 1-hour, and 15-minute averages of NOx concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the air pollution control system (from the NOx CEMS).
e. The temperature at the inlet and outlet of the SCR catalyst and the ammonia catalyst. f. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
g. The date, time, and duration of operation from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit (or manufacturer specified minimum SCR inlet temperature, if different).
h. The molar ratio of the ammonia flowrate to the NOx flowrate. i. Ammonia injection flow rate.
j. Gas flow rate to the SCR in scfm.
II. Submit an Ammonia Slip Compliance Plan subject to approval by South Coast AQMD, within 6 months of the date from notification of publication of the NH3 CEMS QA/QC Plan/ certification. The Ammonia Slip Compliance Plan submittal shall contain but not be limited to, unless otherwise approved by South Coast AQMD:
a. All monitoring records as required by Condition 25(E)(I). b. Calibration records of temperature, differential pressure, ammonia injection flow, and engine exhaust back pressure monitoring systems.
c. A detailed description of the proposed ammonia usage limitation based on a ratio limit, mass balance limit, and/or other operational parameter(s) to ensure ammonia slip will not exceed the ammonia emission limit established by the permit. d. A detailed description of the procedure used to develop the ammonia usage limitation including all supporting information such as monitoring and operating data and parameters, assumptions, estimates, correlations, equations used or developed, calculations; and the scientific/technical basis and rationale for the proposed procedure.
e. A detailed description of operating data and parameters that will be monitored to determine the ammonia usage limitation and the associated proposed recordkeeping procedures and formats of such data and parameters.
f. A detailed description of the procedure of how the ammonia usage limitation will be implemented into the SCR control/analyzer and ammonia injection system, and the procedure and format for how changes to the SCR control/analyzer and ammonia injection system are documented and retained.
g. A detailed description of the format, procedures, and schedule for recordkeeping and monitoring, sufficient to assure compliance.
h. A detailed description of the procedures for responding to, diagnosing and correcti ng breakdowns, faults, or malfunctions in the SCR control/analyzer and ammonia injection system.
i. A detailed description of the procedures for determining whether the ammonia usage during a breakdown, fault, or malfunction was within the parameter(s) pro posed and/or approved in the Ammonia Slip Compliance Plan and how those values will be reported (missing data procedures).
116 of 153
Section H Page 49
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
j. A detailed description of procedures for identifying whether the proposed ammonia usage limitation is still representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
k. A detailed description of the proposed timeframe and procedures upon which the ammonia usage limitation will be periodically re-assessed if found to no longer be representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
III. If the Ammonia Slip Compliance Plan is assessed to be no longer representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit, pursuant to the procedures of Condition No. 25(II)(j) the operator shall, unless otherwise approved by South Coast AQMD:
a. Provide written notification to South Coast AQMD (Attn: Waste Management Permitting) that the Ammonia Slip Compliance Plan is no longer representative within 14 days from the date the operator has made the determination, and b. Install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 24 months from the date South Coast AQMD has been notified, or
c. Submit a revised Ammonia Slip Compliance Plan with information containing but no limited to the information identified in Condition No. 25(E)(II), unless otherwise approved by South Coast AQMD, no later than 60 days from the date South Coast AQMD has been notified.
[Rule 204, Rule 218.2, Rule 218.3]
26. Should the Ammonia Slip Compliance Plan not be approved by South Coast AQMD within 12 months from the date of submittal, the operator shall install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 36 months fr om the date the Ammonia Slip Compliance Plan was submitted to South Coast AQMD.
[Rule 204]
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
117 of 153
Section H Page 50
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
29. All records required to demonstrate compliance with this permit shall be kept and maintained for at least five (5) years and shall be made available to South Coast AQMD personnel upon request. [Rule 204]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
NH3: 5 ppmv @15% O2, ammonia slip, one-hour average, Rule 1303(a)(1) BACT/LAER NH3: 0.21 lb/hr, ammonia slip, Rule 1303(b)(2) Offsets
118 of 153
Section H Page 51
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595665
Granted as of: TBD
Equipment Description:
Air Pollution Control System No. 3 consisting of:
1. Oxidation Catalyst, Johnson Matthey or equivalent, Model No. SC09 or equivalent, with one layer of corrugated metallic foil type platinum microporous catalyst or equivalent modules, each Approximately 1’ L. x 1’ W. x 0’ -
3.5” H., with a total volume of approximately 7.3 cubic ft.
2. Aqueous Ammonia Injection System.
3. Selective Catalytic Reduction (SCR) System with:
A. Catalyst Guard Bed layer, Johnson Matthey SW55 wash-coat type or equivalent, approximately 1’ L. x 1’ W. x 0’-4” H., with approximately 7 cubic feet volume.
B. SCR Catalyst, Johnson Matthey SW55 or equivalent consisting of two layers of honeycomb -type ceramic type microporous catalyst or equivalent modules, each approximately 1’ L. x 1’ W. x 1’ H., with a total volume of approximately 47 cubic ft.
C. Ammonia Slip Catalyst, Johnson Matthey DW3140 or equivalent, consisting of one layer of honeycomb-type mixed metal ceramic microporous catalyst, modules, each 1’ L. x 1’ W. x 0’ -6” H, with a total volume of approximately 12 cubic ft.
4. Exhaust Stack, 40’ H. x 2’ Dia.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. The NOx and CO monitoring and ammonia injection system shall be in full operation whenever the selective catalytic reduction (SCR) system is in operation.
[Rule 204]
5. This air pollution control system shall be in full operation whenever the internal combustion engine it is venting is in operation, unless otherwise noted in this permit or the internal combustion engine permit (A/N 5956 61 or subsequent).
[Rule 204]
6. This equipment shall be inspected and maintained per manufacturer’s specifications. Records of the inspection and maintenance of this equipment shall be maintained and be retained for at least five years and be made available the South Coast AQMD personnel upon request.
[Rule 204]
119 of 153
Section H Page 52
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
7. During the first catalyst replacement and/or overhaul during which the SCR is shutdown, the operator shall sample each catalyst type (Oxidation, SCR, and Ammonia) and shall analyze catalyst activity/health, unless otherwise approved in writing by South Coast AQMD. The results shall be submitted to the South Coast AQMD (Attention Waste Management Permitting) within 60 days of the sampling event. [Rule 204]
8. An adequate number of sampling ports shall be installed and maintained at the inlet and outlet of the air pollution control system in accordance with Rule 217 and South Coast AQMD’s approval. [Rule 204, 217]
9. An adequate number of sampling ports shall be installed and maintained in the exhaust stack at least one-half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g. elbows, tees and fans). Each sampling port shall consist of a four -inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon written approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
10. The operator shall install and maintain temperature measuring and recording system(s) to accurately measure and record the temperature in degrees Fahrenheit at the inlet and outlet of the oxidation catalyst, SCR catalyst and ammonia catalyst. The temperatures shall be continuously measured and recorded. The temperature measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least once every twelve months. The temperature sensors shall be inspected and/or cleaned every six months. Records shall be maintained indicating each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
11. The minimum temperature of the engine exhaust at the inlet of the SCR unit shall be at least 550 degrees Fahrenheit. The period during which the temperature of exhaust gases entering the SCR Unit is less than 550 degrees Fahrenheit shall not exceed 30 minutes for each cold start-up and shutdown. [Rule 204, 1110.2]
12. The maximum temperature of the exhaust gases entering the SCR unit shall not exceed 860 degrees Fahrenheit. [Rule 204]
13. The operator shall install and maintain differential pressure measuring and recording system(s) to accurately indicate the differential pressure in inches of water column across the SCR catalyst and across the oxidation catalyst. The differential pressure shall be continuously measured and recorded. The diff erential pressure measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least once every twelve months. The differential pressure sensors shall be inspected and/or cleaned every six months. Records shall be maintained showing each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
14. The differential pressure across each catalyst (the SCR catalyst and the oxidation catalyst) shall not exceed 5 inches of water column
[Rule 204]
120 of 153
Section H Page 53
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The ammonia injection system shall be operated only when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit.
[Rule 204]
16. The ammonia injection system shall be equipped with a fully modulated automated control system tuned to minimize ammonia slip.
[Rule 204]
17. The one-hour average ammonia concentration at the outlet of the SCR unit shall not exceed 5 ppmvd at 15% oxygen when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT/LAER]
18. The fifteen-minute average NOx concentration at the outlet of the SCR unit shall not exceed 11 ppmv corrected to 15 percent oxygen when the SCR inlet temperature is above 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT]
19. The operator shall install and maintain an ammonia flow rate measuring and recording system to accurately indicate and record the ammonia injection flow rate to the selective catalytic reduction system. [Rule 204]
20. The operator shall install and maintain a NOx (NO) analyzer to measure SCR inlet NO concentration and shall calibrate the analyzer at least annually in accordance with the manufacturer’s specifications. [Rule 204]
21. Prior to the installation and operation of an ammonia (NH3) CEMS that has been approved or certified, when the SCR is in operation, the operator shall estimate the ammonia concentration in the SCR outlet, based on one -hour average corrected to 15% oxygen from the ammonia injection flow rate, and the SCR inlet and outlet NOx emission rates and limit the estimated ammonia concentration in the SCR outlet to a maximum of 5 ppmv corrected to 15% oxygen. This analysis shall no longer be required after the installation and operation of an NH3 CEMS.
[Rule 204]
22. A data acquisition system or its equivalent shall be installed and maintained to record the following:
A. The date, time, and hours of operation.
B. The 24-hours and one-hour average NOx, and CO concentrations, in ppmv corrected to 15% O2 dry basis, at the inlet and outlet of the SCR system.
C. The exhaust gas inlet and outlet temperatures to the oxidation catalyst and the SCR catalyst.
D. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
E. The total time in minutes from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit.
F. The ammonia injection flow rate, pounds per hour.
G. The molar ratio of the ammonia flowrate to the NOx flowrate. (No longer required after the installation and operation of an NH3 CEMS).
H. The estimated ammonia concentration at the outlet of the SCR unit exhaust stack, . [Rule 204, Rule 3004 (a)(4)]
23. At least once each quarter after the initial start-up siloxane test results from the landfill gas conditioning and supply system have been received, the operator shall monitor and record SCR performance parameters, and perform a correlation analysis between these parameters and the siloxane levels in the landfill gas. Performance parameters include but are not limited to NOx emission readings from the CEMS units, differential press ure 121 of 153
Section H Page 54
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
across the oxidation catalyst and SCR catalyst, ammonia injection flow rate, and the ammonia to NOx molar ratio. This analysis shall no longer be required after the installation and operation of an NH3 CEMS. [Rule 204]
24. The ammonia slip source tests shall be conducted in accordance with the following:
A. Source testing shall be conducted concurrently with the required initial source testing of the engine within 180 days after initial start-up of this equipment, then subsequently at least once every six months, unless otherwise approved in writing by South Coast AQMD.
B. The ammonia slip test shall be conducted using South Coast AQMD approved methods and results averaged over 1 hour.
C. All source tests shall be conducted in accordance with a valid South Coast AQMD approved test protocol.
D. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) as applicable and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
E. The contractor shall not conduct any pre-tests for compliance.
F. A source test protocol shall be submitted for approval no later than 60 days prior to a scheduled source test date or a valid previously South Coast AQMD approved protocol may be used for recurring source test.
G. No later than 14 days prior to conducting a source test, South Coast AQMD shall be notified of the scheduled source test date. If a scheduled source test is delayed, South Coast AQMD shall be notified within 24 hours from the time that an owner or operator knew of the delay. South Coast AQMD shal l be notified at least 7 days prior to the rescheduled date of the source test or arrange a rescheduled date with South Coast AQMD by mutual agreement.
H. An owner or operator shall submit the source test report, including a description of the unit tested, to the South Coast AQMD within 60 days of completion of the source test.
I. Records of the ammonia slip tests shall be kept for at least five years and be made available to South Coast AQMD personnel upon request.
J. Ammonia slip source tests are not required when a South Coast AQMD certified ammonia CEMS is operational.
[Rule 204]
25. No later than 36 months of the date the South Coast AQMD notifies the facility of South Coast AQMD having published a Quality Assurance/Quality Control (QA/QC) Plan/certification procedures for NH3 CEMS, the NH3 CEMS shall be installed, operational, and certified by South Coast AQMD, unless otherwise approved by South Coast AQMD. The NH3 CEMS shall be installed and maintained in accordance with the following:
A. NH3 concentration in ppmv averaged over 1 hour.
B. Concentrations shall be corrected to 15 percent oxygen on a dry basis.
C. The NH3 CEMS shall be installed and maintained to continuously record the parameter being measured.
D. Continuous operation of the monitoring system is not required when required calibration, maintenance, or repair activities are performed in accordance with manufacturer's recommendations. The operator shall take all reasonable actions to minimize the time required to perform such activities. In no event, shall any such activities exceed 96 consecutive hours for any one calibration, maintenance , or repair episode.
E. As an alternative to installing, operating, and certifying an NH3 CEMS no later than 36 months from notification of publication of the NH3 CEMS QA/QC Plan/certification, the operator shall:
I. Continuously monitor and record:
a. The date, time, and hours of operation of the engine and this equipment. 122 of 153
Section H Page 55
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
b. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the inlet to the SCR catalyst (from the SCR controller/analyzer), if available.
c. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the SCR catalyst (from the SCR controller/analyzer unit with NOx (NO) monitor).
d. The 24-hour, 1-hour, and 15-minute averages of NOx concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the air pollution control system (from the NOx CEMS).
e. The temperature at the inlet and outlet of the SCR catalyst and the ammonia catalyst. f. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
g. The date, time, and duration of operation from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit (or manufacturer specified minimum SCR inlet temperature, if different).
h. The molar ratio of the ammonia flowrate to the NOx flowrate. i. Ammonia injection flow rate.
j. Gas flow rate to the SCR in scfm.
II. Submit an Ammonia Slip Compliance Plan subject to approval by South Coast AQMD, within 6 months of the date from notification of publication of the NH3 CEMS QA/QC Plan/ certification. The Ammonia Slip Compliance Plan submittal shall contain but not be limited to, unless otherwise approved by South Coast AQMD:
a. All monitoring records as required by Condition 25(E)(I). b. Calibration records of temperature, differential pressure, ammonia injection flow, and engine exhaust back pressure monitoring systems.
c. A detailed description of the proposed ammonia usage limitation based on a ratio limit, mass balance limit, and/or other operational parameter(s) to ensure ammonia slip will not exceed the ammonia emission limit established by the permit. d. A detailed description of the procedure used to develop the ammonia usage limitation including all supporting information such as monitoring and operating data and parameters, assumptions, estimates, correlations, equations used or developed, calculations; and the scientific/technical basis and rationale for the proposed procedure.
e. A detailed description of operating data and parameters that will be monitored to determine the ammonia usage limitation and the associated proposed recordkeeping procedures and formats of such data and parameters.
f. A detailed description of the procedure of how the ammonia usage limitation will be implemented into the SCR control/analyzer and ammonia injection system, and the procedure and format for how changes to the SCR control/analyzer and ammonia injection system are documented and retained.
g. A detailed description of the format, procedures, and schedule for recordkeeping and monitoring, sufficient to assure compliance.
h. A detailed description of the procedures for responding to, diagnosing and correcting breakdowns, faults, or malfunctions in the SCR control/analyzer and ammonia injection system.
i. A detailed description of the procedures for determining whether the ammonia usage during a breakdown, fault, or malfunction was within the parameter(s) proposed and/or approved in the Ammonia Slip Compliance Plan and how those values will be reported (missing data procedures).
123 of 153
Section H Page 56
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
j. A detailed description of procedures for identifying whether the proposed ammonia usage limitation is still representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
k. A detailed description of the proposed timeframe and procedures upon which the ammonia usage limitation will be periodically re-assessed if found to no longer be representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
III. If the Ammonia Slip Compliance Plan is assessed to be no longer representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit, pursuant to the procedures of Condition No. 25(II)(j) the operator shall, unless otherwise approved by South Coast AQMD:
a. Provide written notification to South Coast AQMD (Attn: Waste Management Permitting) that the Ammonia Slip Compliance Plan is no longer representative within 14 days from the date the operator has made the determination, and b. Install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 24 months from the date South Coast AQMD has been notified, or
c. Submit a revised Ammonia Slip Compliance Plan with information containing but no limited to the information identified in Condition No. 25(E)(II), unless otherwise approved by South Coast AQMD, no later than 60 days from the date South Coast AQMD has been notified.
[Rule 204, Rule 218.2, Rule 218.3]
26. Should the Ammonia Slip Compliance Plan not be approved by South Coast AQMD within 12 months from the date of submittal, the operator shall install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 36 months fr om the date the Ammonia Slip Compliance Plan was submitted to South Coast AQMD.
[Rule 204]
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
124 of 153
Section H Page 57
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
29. All records required to demonstrate compliance with this permit shall be kept and maintained for at least five (5) years and shall be made available to South Coast AQMD personnel upon request. [Rule 204]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
NH3: 5 ppmv @15% O2, ammonia slip, one-hour average, Rule 1303(a)(1) BACT/LAER NH3: 0.21 lb/hr, ammonia slip, Rule 1303(b)(2) Offsets
125 of 153
Section H Page 58
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 565666
Granted as of: TBD
Equipment Description:
Air Pollution Control System No. 4 consisting of:
1. Oxidation Catalyst, Johnson Matthey or equivalent, Model No. SC09 or equivalent, with one layer of corrugated metallic foil type platinum microporous catalyst or equivalent modules, each Approximately 1’ L. x 1’ W. x 0’ -
3.5” H., with a total volume of approximately 7.3 cubic ft.
2. Aqueous Ammonia Injection System.
3. Selective Catalytic Reduction (SCR) System with:
A. Catalyst Guard Bed layer, Johnson Matthey SW55 wash-coat type or equivalent, approximately 1’ L. x 1’ W. x 0’-4” H., with approximately 7 cubic feet volume.
B. SCR Catalyst, Johnson Matthey SW55 or equivalent consisting of two layers of honeycomb -type ceramic type microporous catalyst or equivalent modules, each approximately 1’ L. x 1’ W. x 1’ H., with a total volume of approximately 47 cubic ft.
C. Ammonia Slip Catalyst, Johnson Matthey DW3140 or equivalent, consisting of one layer of honeycomb-type mixed metal ceramic microporous catalyst, modules, each 1’ L. x 1’ W. x 0’ -6” H, with a total volume of approximately 12 cubic ft.
4. Exhaust Stack, 40’ H. x 2’ Dia.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. The NOx and CO monitoring and ammonia injection system shall be in full operation whenever the selective catalytic reduction (SCR) system is in operation.
[Rule 204]
5. This air pollution control system shall be in full operation whenever the internal combustion engine it is venting is in operation, unless otherwise noted in this permit or the internal combustion engine permit (A/N 5956 62 or subsequent).
[Rule 204]
6. This equipment shall be inspected and maintained per manufacturer’s specifications. Records of the inspection and maintenance of this equipment shall be maintained and be retained for at least five years and be made available the South Coast AQMD personnel upon request.
[Rule 204]
126 of 153
Section H Page 59
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
7. During the first catalyst replacement and/or overhaul during which the SCR is shutdown, the operator shall sample each catalyst type (Oxidation, SCR, and Ammonia) and shall analyze catalyst activity/health, unless otherwise approved in writing by South Coast AQMD. The results shall be submitted to the South Coast AQMD (Attention Waste Management Permitting) within 60 days of the sampling event. [Rule 204]
8. An adequate number of sampling ports shall be installed and maintained at the inlet and outlet of the air pollution control system in accordance with Rule 217 and South Coast AQMD’s approval. [Rule 204, 217]
9. An adequate number of sampling ports shall be installed and maintained in the exhaust stack at least one-half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g. elbows, tees and fans). Each sampling port shall consist of a four -inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon written approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided within 48 hours’ notice by the South Coast AQMD.
[Rule 204, 217]
10. The operator shall install and maintain temperature measuring and recording system(s) to accurately measure and record the temperature in degrees Fahrenheit at the inlet and outlet of the oxidation catalyst, SCR catalyst and ammonia catalyst. The temperatures shall be continuously measured and recorded. The temperature measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least once every twelve months. The temperature sensors shall be inspected and/or cleaned every six months. Records shall be maintained indicating each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
11. The minimum temperature of the engine exhaust at the inlet of the SCR unit shall be at least 550 degrees Fahrenheit. The period during which the temperature of exhaust gases entering the SCR Unit is less than 550 degrees Fahrenheit shall not exceed 30 minutes for each cold start-up and shutdown. [Rule 204, 1110.2]
12. The maximum temperature of the exhaust gases entering the SCR unit shall not exceed 860 degrees Fahrenheit. [Rule 204]
13. The operator shall install and maintain differential pressure measuring and recording system(s) to accurately indicate the differential pressure in inches of water column across the SCR catalyst and across the oxidation catalyst. The differential pressure shall be continuously measured and recorded. The differential pressure measuring devices shall be accurate to within plus or minus 5 percent and shall be calibrated at least onc e every twelve months. The differential pressure sensors shall be inspected and/or cleaned every six months. Records shall be maintained showing each cleaning/inspection and replacement/calibration of the device. Revised cleaning and/or calibration schedules may be re-assessed after two years of operational records are provided. [Rule 204]
14. The differential pressure across each catalyst (the SCR catalyst and the oxidation catalyst) shall not exceed 5 inches of water column
[Rule 204]
127 of 153
Section H Page 60
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
15. The ammonia injection system shall be operated only when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit.
[Rule 204]
16. The ammonia injection system shall be equipped with a fully modulated automated control system tuned to minimize ammonia slip.
[Rule 204]
17. The one-hour average ammonia concentration at the outlet of the SCR unit shall not exceed 5 ppmvd at 15% oxygen when the SCR inlet temperature is greater than or equal to 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT/LAER]
18. The fifteen-minute average NOx concentration at the outlet of the SCR unit shall not exceed 11 ppmv corrected to 15 percent oxygen when the SCR inlet temperature is above 550 degrees Fahrenheit. [Rule 204, 1303(a)(1) BACT]
19. The operator shall install and maintain an ammonia flow rate measuring and recording system to accurately indicate and record the ammonia injection flow rate to the selective catalytic reduction system. [Rule 204]
20. The operator shall install and maintain a NOx (NO) analyzer to measure SCR inlet NO concentration and shall calibrate the analyzer at least annually in accordance with the manufacturer’s specifications. [Rule 204]
21. Prior to the installation and operation of an ammonia (NH3) CEMS that has been approved or certified, when the SCR is in operation, the operator shall estimate the ammonia concentration in the SCR outlet, based on one -hour average corrected to 15% oxygen from the ammonia injection flow rate, and the SCR inlet and outlet NOx emission rates and limit the estimated ammonia concentration in the SCR outlet to a maximum of 5 ppmv corrected to 15% oxygen. This analysis shall no longer be required after the installation and operation of an NH3 CEMS.
[Rule 204]
22. A data acquisition system or its equivalent shall be installed and maintained to record the following:
A. The date, time, and hours of operation.
B. The 24-hours and one-hour average NOx, and CO concentrations, in ppmv corrected to 15% O2 dry basis, at the inlet and outlet of the SCR system.
C. The exhaust gas inlet and outlet temperatures to the oxidation catalyst and the SCR catalyst.
D. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
E. The total time in minutes from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit.
F. The ammonia injection flow rate, pounds per hour.
G. The molar ratio of the ammonia flowrate to the NOx flowrate. (No longer required after the installation and operation of an NH3 CEMS).
H. The estimated ammonia concentration at the outlet of the SCR unit exhaust stack, . [Rule 204, Rule 3004 (a)(4)]
23. At least once each quarter after the initial start-up siloxane test results from the landfill gas conditioning and supply system have been received, the operator shall monitor and record SCR performance parameters, and perform a correlation analysis between these parameters and the siloxane levels in the landfill ga s. Performance parameters include but are not limited to NOx emission readings from the CEMS units, differential pressure 128 of 153
Section H Page 61
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
across the oxidation catalyst and SCR catalyst, ammonia injection flow rate, and the ammonia to NOx molar ratio. This analysis shall no longer be required after the installation and operation of an NH3 CEMS. [Rule 204]
24. The ammonia slip source tests shall be conducted in accordance with the following:
A. Source testing shall be conducted concurrently with the required initial source testing of the engine within 180 days after initial start-up of this equipment, then subsequently at least once every six months, unless otherwise approved in writing by South Coast AQMD.
B. The ammonia slip test shall be conducted using South Coast AQMD approved methods and results averaged over 1 hour.
C. All source tests shall be conducted in accordance with a valid South Coast AQMD approved test protocol.
D. Testing shall be conducted by an approved contractor under the South Coast AQMD Laboratory Approval Program (LAP) as applicable and in compliance with South Coast AQMD Rule 304 (No Conflict of Interest).
E. The contractor shall not conduct any pre-tests for compliance.
F. A source test protocol shall be submitted for approval no later than 60 days prior to a scheduled source test date or a valid previously South Coast AQMD approved protocol may be used for recurring source test.
G. No later than 14 days prior to conducting a source test, South Coast AQMD shall be notified of the scheduled source test date. If a scheduled source test is delayed, South Coast AQMD shall be notified within 24 hours from the time that an owner or operator knew of the delay. South Coast AQMD shal l be notified at least 7 days prior to the rescheduled date of the source test or arrange a rescheduled date with South Coast AQMD by mutual agreement.
H. An owner or operator shall submit the source test report, including a description of the unit tested, to the South Coast AQMD within 60 days of completion of the source test.
I. Records of the ammonia slip tests shall be kept for at least five years and be made available to South Coast AQMD personnel upon request.
J. Ammonia slip source tests are not required when a South Coast AQMD certified ammonia CEMS is operational.
[Rule 204]
25. No later than 36 months of the date the South Coast AQMD notifies the facility of South Coast AQMD having published a Quality Assurance/Quality Control (QA/QC) Plan/certification procedures for NH3 CEMS, the NH3 CEMS shall be installed, operational, and certified by South Coast AQMD, unless otherwise approved by South Coast AQMD. The NH3 CEMS shall be installed and maintained in accordance with the following:
A. NH3 concentration in ppmv averaged over 1 hour.
B. Concentrations shall be corrected to 15 percent oxygen on a dry basis.
C. The NH3 CEMS shall be installed and maintained to continuously record the parameter being measured.
D. Continuous operation of the monitoring system is not required when required calibration, maintenance, or repair activities are performed in accordance with manufacturer's recommendations. The operator shall take all reasonable actions to minimize the time required to perform such activities. In no event, shall any such activities exceed 96 consecutive hours for any one calibr ation, maintenance, or repair episode.
E. As an alternative to installing, operating, and certifying an NH3 CEMS no later than 36 months from notification of publication of the NH3 CEMS QA/QC Plan/certification, the operator shall:
I. Continuously monitor and record:
a. The date, time, and hours of operation of the engine and this equipment. 129 of 153
Section H Page 62
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
b. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the inlet to the SCR catalyst (from the SCR controller/analyzer), if available.
c. The 24-hour, 1-hour, and 15-minute averages of NOx (NO) concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the SCR catalyst (from the SCR controller/analyzer unit with NOx (NO) monitor).
d. The 24-hour, 1-hour, and 15-minute averages of NOx concentration in ppmv and ppmv corrected to 15% O2 dry basis, at the outlet of the air pollution control system (from the NOx CEMS).
e. The temperature at the inlet and outlet of the SCR catalyst and the ammonia catalyst. f. The differential pressure in inches of water column across the oxidation catalyst and the SCR catalyst.
g. The date, time, and duration of operation from cold start-up to reach SCR inlet temperature of 550 degrees Fahrenheit (or manufacturer specified minimum SCR inlet temperature, if different).
h. The molar ratio of the ammonia flowrate to the NOx flowrate. i. Ammonia injection flow rate.
j. Gas flow rate to the SCR in scfm.
II. Submit an Ammonia Slip Compliance Plan subject to approval by South Coast AQMD, within 6 months of the date from notification of publication of the NH3 CEMS QA/QC Plan/ certification. The Ammonia Slip Compliance Plan submittal shall contain but not be limited to, unless otherwise approved by South Coast AQMD:
a. All monitoring records as required by Condition 25(E)(I). b. Calibration records of temperature, differential pressure, ammonia injection flow, and engine exhaust back pressure monitoring systems.
c. A detailed description of the proposed ammonia usage limitation based on a ratio limit, mass balance limit, and/or other operational parameter(s) to ensure ammonia slip will not exceed the ammonia emission limit established by the permit. d. A detailed description of the procedure used to develop the ammonia usage limitation including all supporting information such as monitoring and operating data and parameters, assumptions, estimates, correlations, equations used or developed, calculations; and the scientific/technical basis and rationale for the proposed procedure.
e. A detailed description of operating data and parameters that will be monitored to determine the ammonia usage limitation and the associated proposed recordkeeping procedures and formats of such data and parameters.
f. A detailed description of the procedure of how the ammonia usage limitation will be implemented into the SCR control/analyzer and ammonia injection system, and the procedure and format for how changes to the SCR control/analyzer and ammonia injection system are documented and retained.
g. A detailed description of the format, procedures, and schedule for recordkeeping and monitoring, sufficient to assure compliance.
h. A detailed description of the procedures for responding to, diagnosing and correcting breakdowns, faults, or malfunctions in the SCR control/analyzer and ammonia injection system.
i. A detailed description of the procedures for determining whether the ammonia usage during a breakdown, fault, or malfunction was within the parameter(s) proposed and/or approved in the Ammonia Slip Compliance Plan and how those values will be reported (missing data procedures).
130 of 153
Section H Page 63
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
j. A detailed description of procedures for identifying whether the proposed ammonia usage limitation is still representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
k. A detailed description of the proposed timeframe and procedures upon which the ammonia usage limitation will be periodically re-assessed if found to no longer be representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit.
III. If the Ammonia Slip Compliance Plan is assessed to be no longer representative for ensuring ammonia slip will not exceed the ammonia emission limit established by the permit, pursuant to the procedures of Condition No. 25(II)(j) the operator shall, unless otherwise approved by South Coast AQMD:
a. Provide written notification to South Coast AQMD (Attn: Waste Management Permitting) that the Ammonia Slip Compliance Plan is no longer representative within 14 days from the date the operator has made the determination, and b. Install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 24 months from the date South Coast AQMD has been notified, or
c. Submit a revised Ammonia Slip Compliance Plan with information containing but no limited to the information identified in Condition No. 25(E)(II), unless otherwise approved by South Coast AQMD, no later than 60 days from the date South Coast AQMD has been notified.
[Rule 204, Rule 218.2, Rule 218.3]
26. Should the Ammonia Slip Compliance Plan not be approved by South Coast AQMD within 12 months from the date of submittal, the operator shall install, operate, and obtain certification by South Coast AQMD for an NH3 CEMS that satisfies Condition No. 25(A through C) no later than 36 months from the date the Ammonia Slip Compliance Plan was submitted to South Coast AQMD.
[Rule 204]
27. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the followi ng information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
28. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
131 of 153
Section H Page 64
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
29. All records required to demonstrate compliance with this permit shall be kept and maintained for at least five (5) years and shall be made available to South Coast AQMD personnel upon request. [Rule 204]
Emissions and Requirements:
30. This equipment is subject to the applicable requirements of the following Rules and Regulations:
NH3: 5 ppmv @15% O2, ammonia slip, one-hour average, Rule 1303(a)(1) BACT/LAER NH3: 0.21 lb/hr, ammonia slip, Rule 1303(b)(2) Offsets
132 of 153
Section H Page 65
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595667
Granted as of: TBD
Equipment Description:
Landfill Gas (LFG) Treatment System consisting of:
1. Untreated LFG inlet manifold, 6,200 scfm capacity.
2 Four Adsorption Vessels, Fixed Bed Type in parallel, each containing a minimum of 53,000 pounds Axtrop 40001 granulated reactant media, or equivalent, for controlling sulfur compounds.
3. Condenser No.1.
4. Gas/liquid Separator No.1.
5. Compressor.
6. Gas/liquid Separator No.2.
7. Two Adsorption Vessels, Temperature Swing Adsorption (TSA) Type, 12’ Dia. x 20’ H., each containing a minimum of 2,000 cubic feet of Activated Alumina or equivalent adsorption media for controlling siloxanes.
8. [Optional] Two Adsorption Vessels, Temperature Swing Adsorption (TSA) Type, 12 ’ Dia. x 20’ H., each containing a minimum of 2,000 cubic feet of Activated Alumina or equivalent adsorption media for controlling siloxanes.
9. Two Adsorption Vessels, Fixed Bed Type, 12’ Dia. x 20’ H., each containing a minimum of 2,000 cubic feet of Activated Granulated Carbon.
10. Heater, Electrically powered.
11. Inline Filter.
12. Treated LFG Cooler.
13. Treated LFG outlet manifold to Internal Combustion Engines.
14. Adsorption System Regeneration Gas outlet to flare.
15. Condensate Collection, Treatment and Discharge equipment.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. This equipment shall be used only for the treatment of landfill gas. [Rule 204]
5. A flow indicator shall be installed and maintained at the inlet stream to the LFG treatment system, treatment system outlet, and regeneration off-gas outlet, to indicate these total flow rates in standard cubic feet per Minute (scfm). In case a pressure sensor device is used in place of the flow indicator, a conversion chart shall be available to indicate the correspondent flow rate in SCFM, to the pressure reading. [Rule 204]
133 of 153
Section H Page 66
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
6. Whenever the LFG treatment system is in operation, the daily flow rate of raw LFG accepted, LFG treated, and regeneration off-gas generated, in standard cubic feet per day (scfd) shall be recorded. [Rule 204]
7. An adequate number of sampling ports shall be installed and maintained at the inlet and outlet of each adsorption train, regeneration gas outlet line, and the inlet and outlet of the LFG treatment system in accordance with Rule 217 and South Coast AQMD’s approval.
[Rule 204, Rule 217]
8. All LFG processing components under positive pressure shall be monitored for leaks on a quarterly basis and prior to scheduled maintenance or during planned outage periods or as otherwise approved in a valid Rule 1150.1 Compliance Plan using an approved Organic Vapor Analyzer (OVA). Dates, times, monitoring results, and corrective actions shall be kept and maintained on file. [Rule 204, 1150.1]
9. This equipment shall be operated so that there are no leaks that exceed 500 ppm total organic compounds, measured as methane, at any LFG processing component under positive pressure. Any component leak must be tagged and repaired with 10 calendar days from the time of the first exceedance as applicable, or as otherwise approved in a valid Rule 1150.1 Compliance Plan.
[Rule 204, and Rule 1150.1]
10. Samples shall be collected at the inlet and outlet of the LFG treatment system and regeneration off -gas line, at initial start-up and on a monthly basis for the first six months, and then on a quarterly basis thereafter, unless otherwise approved in writing by South Coast AQMD. All gas samples shall be analyzed by a South Coast AQMD Laboratory Approval Program (LAP) approved laboratory or as otherwise approved in writing by South Coast AQMD, for concentrations (ppmv or ppbv) of:
A. Total Siloxanes (Organic Silicon Compounds).
B. Total Non-Methane Organic Compounds (TNMOC), and
C. Total Reduced Sulfur Compounds, as H2S and speciated sulfur compounds.
All sampling and analyses shall conform with EPA, CARB, or South Coast AQMD approved methods. All results shall be recorded.
[Rule 204]
11. The LFG Treatment system shall be operated in accordance with manufacturer’s recommended operating specifications and the following operating parameters shall be monitored and recorded at least once each day o f operation:
A. Process Temperatures and pressures.
B. Regeneration Duration.
C. Regeneration Frequency.
[Rule 204]
12. During an adsorbent regeneration period, the regeneration off-gas from the adsorber train shall be vented at all times to an air pollution control system which is in full operation and has a valid Permit to Construct/Operate issued by the South Coast AQMD.
[Rule 204]
13. Spent media removed from the sulfur control system shall be stored in closed containers prior to disposal. [Rule 204]
134 of 153
Section H Page 67
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
14. Operation of this equipment shall not result in the release of LFG or regeneration off-gas into the atmosphere.
Any breakdown or malfunction which results in emission of LFG or regeneration off -gas shall be reported to South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be undertaken to correct the problem and prevent further emissions into the atmosphere. [Rule 402, Rule 430]
15. If a distinct odor resulting from the operation of this equipment is detected at or beyond the facility property line, the operator shall investigate and determine the odor source(s) and undertake mitigation and/or remedial measures to correct the problem. Mitigation measures which are deemed appropriate by South Coast AQMD personnel as necessary to protect the comfort, repose, health, or safety of the public shall be implemented upon request.
[Rule 204, Rule 402]
16. The operator shall maintain records of each instance of media replenishment or change -out. The records shall include the date of each media replenishment or change-out and the type and amount of media replenished or replaced.
[Rule 204]
17. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
18. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities, quantity and type of adsorbent media) and P&I diagrams to South Coast AQMD (attn:
Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD. The submittal shall also identify the equipment location, initial operation date, and application number.
[Rule 204]
19. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 3004(a)(4)]
135 of 153
Section H Page 68
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 595669
Granted as of: TBD
Equipment Description:
Storage Tank, Aqueous Ammonia, 8 feet Dia. x 36 feet L., maximum 12,000 gallons capacity, with vacuum/pressure relief valve.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. The maximum volume of aqueous ammonia dispensed from this storage tank shall not exceed 12,000 gallons in any one calendar month.
[Rule 204, 1303(b)(2) Offsets]
5. Records of monthly aqueous ammonia delivered and dispensed shall be prepared and retained on site for at least five years and shall be made available to South Coast AQMD representatives upon request. [Rule 204, 3004(a)(4)]
6. Only aqueous ammonia, with a maximum ammonia concentration which does not exceed 1 9% by weight, shall be stored in this equipment.
[Rule 204]
7. Safety data sheets for the aqueous ammonia used in this equipment shall be kept current and shall be made available to South Coast AQMD representatives upon request [Rule 204]
8. The pressure relief valve shall be set at a minimum of 25 psi. [Rule 204]
9. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested. 136 of 153
Section H Page 69
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
10. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
11. All records required to demonstrate compliance with this permit shall be kept and maintained for at least five (5) years and shall be made available to South Coast AQMD personnel upon r equest. [Rule 204]
137 of 153
Section H Page 70
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
PERMIT TO CONSTRUCT
A/N 565670
Granted as of: TBD
Equipment Description:
Regeneration Gas Flare, Enclosed, Landfill Gas Fired, 6.85 MMBtu/hr, John Zink or equivalent, Ultra-Low Emission or equivalent, 28’ H x 4’ Dia., venting a Landfill Gas (LFG) Treatment System Adsorption Vessels.
Conditions:
1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below. [Rule 204]
2. This equipment shall be properly maintained and kept in good operating condition at all times. [Rule 204]
3. This equipment shall be operated by personnel properly trained in its operation. [Rule 204]
4. Identification tag(s) or nameplate(s) shall be displayed on the equipment to show manufacturer, model number, and the rated heat input capacity (HHV) of the burner. The tag(s) or plate(s) shall be issued by the manufacturer and shall be affixed to the equipment in a permanent and conspicuous position. [Rule 204]
5. A flow indicating and recording device shall be installed in the LFG and regeneration landfill gas supply lines to the flare to measure and record the volumetric flow rate of gas (in standard cubic feet per minute) being combusted in the flare. The recording device shall be capable of recording the gas flow rate at least once every 15 minutes.
[Rule 204, 1303(b)(2)-Offset]
6. The total volume of landfill gas burned in the flare shall not exceed 360 standard cubic feet per minute. [Rule 204, 1303(b)(2)-Offset]
7. This flare shall be equipped with a continuous temperature indicator and recorder which measures and records the gas temperature in the flare stack. The temperature indicator and recorder sha ll operate whenever the flare is in operation. The temperature shall be measured at a location above the flame zone, at least 0.6 seconds downstream of the burner and not less than four (4) feet from the top of the stack. [Rule 204, 1303(a)(1)-BACT]
8. Whenever this flare is in operation, a temperature of not less than 1400 degrees Fahrenheit, averaged over 15 minutes, as measure by the temperature indicator and recorder, shall be maintained except during periods of startup and shutdown. Startup is defined as the period from flare ignition to the time when 1400 degrees Fahrenheit is achieved, not to exceed 30 minutes. Shutdown is the period from when the gas valve begins to be shut and completely shuts off, not to exceed 30 minutes. [Rule 1303(a)(1)-BACT ]
138 of 153
Section H Page 71
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
9. This flare shall be equipped with an automatic shut-down and re-start system with a failure alarm, and an automatic combustion air control system which has been approved by South Coast AQMD to automatically isolate the flare from the landfill gas supply line, shut off the blower, and immediately notify a responsible party of the shutdown. The automatic shutdown safety system shall be tested monthly for proper operation of the flare and the results recorded.
[Rule 204, 1303(a)(1)-BACT]
10. Either a pilot flame or LFG combustion flame shall be maintained in the flare whenever LFG or regeneration gas may be venting to the flare.
[Rule 204]
11. The maximum skin temperature at any location of the flare shall not exceed 250 degrees Fahrenheit upon request of South Coast AQMD.
[Rule 204, Rule 217]
12. Weekly reading of the BTU content HHV (BTU/scf) of the gas at the inlet to the flare burner shall be taken using an instrument approved by the South Coast AQMD. All results shall be recorded. [Rule 204, 1303(b)(1) Modeling, 1303(b)(2) Offsets]
13. The heat input through the flare shall not exceed 6.85 million Btu per hour (HHV). A log shall be kept indicating the total heating value of the digester gas burned in the flare based on the recor ded flow rate and weekly Btu content reading.
[Rule 204, 1303(b)(1) Modeling, 1303(b)(2) Offsets ]
14. This equipment shall achieve a methane destruction efficiency of at least 99 percent by weight. [Rule 1150.1]
15. An adequate number of sampling ports shall be maintained in the exhaust stack at least one -half duct diameter upstream of the exhaust outlet, and at least two duct diameters downstream from the nearest flow disturbances (e.g. elbows, tees and fans). Each sampling port shall consist of a four -inch coupling with plug. All ports shall be properly centered. An equivalent method of emission sampling may be used upon written approval of the South Coast AQMD. Adequate and safe access to all source test ports shall be provided within 48 hours’ notice by the South Coast.
[Rule 204, 217]
16. A sampling port shall be maintained at the inlet gas line to the flare to allow the collection of a landfill gas sample.
[Rule 204, 217, 431.1]
17. The flare shall be designed and constructed such that the flame in the flare remains below the height of the flare’s operating thermocouple at all times.
[Rule 204]
18. The exhaust stack shall have a height at least 28’ above grade. [Rule 204]
139 of 153
Section H Page 72
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
19. Operation of this equipment shall not result in the release of LFG or regeneration off-gas into the atmosphere.
Any breakdown or malfunction which results in emissions of LFG shall be reported to the South Coast AQMD in accordance with Rule 430 provisions and immediate remedial measures shall be under taken to correct the problem and prevent further emissions into the atmosphere. [Rule 204, 402, 430, 1150.1]
20. A source test protocol shall be submitted to South Coast AQMD no later than 60 days before the proposed test date and shall be approved in writing by South Coast AQMD before the test commences or a valid previously South Coast AQMD approved protocol may be used for recurring source test. At a minimum, the source test protocol should include the following, unless otherwise approved in writing by Sout h Coast AQMD:
A. The name, address, and phone number of the unit operator and the South Coast AQMD -approved source testing contractor that will conduct the test(s).
B. The application and permit number(s).
C. A copy of the current valid approved permit(s).
D. The current emission limits.
E. A description of the equipment to be tested. Include a process schematic indicating sampling locations/ports, and sampling duct/stack dimensions along with upstream and downstream flow disturbances (e.g. elbows, tees, and fans).
F. A brief process description.
G. Operating conditions under which the test will be performed, including flow rate, temperature, pressure, number of tests to be conducted, and operating loads.
H. A description of the sampling and analytical methods for each constituent measured.
I. Complete calculations for flow rates, concentrations, emission rates, and efficiencies.
J. A description of the calibration and quality assurance procedures.
K. Copy of LAP approval for methods being used in the source test.
L. A statement determining that the testing laboratory qualifies as an “independent testing laboratory” under Rule 304 (no conflict of interest), signed by the responsible authority. [Rule 204, 217, 304]
21. The operator shall conduct a source test on the flare at the maximum flow rates achievable at that time, within 180 days of initial start-up, unless otherwise approved in writing by the Executive Officer. The operator shall submit written results no later than 60 days of testing. The operator shall conduct a source test on the flare every five years in as-found condition. Written notice of the performance tests shall be provided to the South Coast AQMD at least seven (7) days prior to the testing so that an observer may be present.
Pursuant to Rule 1150.1, the operator shall conduct source testing as follows, or pursuant to a valid and approved Rule 1150.1 Compliance Plan. The operator shall conduct source testing for NMOC as hexane and methane annually. Subsequent annual source tests shall be conducted no later than 45 days after the anniversary date of the initial source test. The initial source test shall be submitted to South Coast AQMD no later than 180 days 140 of 153
Section H Page 73
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
after start-up and each succeeding complete annual source test report no later than 45 days after the anniversary date of the initial source test.
The source tests shall be conducted during a typical regeneration off-gas operation period representative of the regeneration cycle that is expected to result in the largest emissions vented to the flare and shall include, but not be limited to, as test of the LFG and regeneration off-gases vented to the flare and the flare exhaust for:
A. Methane (percent by volume).
B. Total non-methane organic compounds (NMOC), (lbs/hr, lb/MMBtu, ppmvd, ppmvd @3% O2, destruction efficiency by weight)
C. Oxides of nitrogen (exhaust only) (lb/hr, lb/MMBtu, ppmvd) D. Carbon monoxide (exhaust only) (lb/hr, lb/MMBtu, ppmvd) E. Total particulates/PM10 (exhaust only) (lb/hr, grains/dscf).
F Total reduced sulfur, as H2S and speciated sulfur compounds of LFG and regen gas (ppmv) G. Carbon dioxide (lb/hr, ppmvd, percent by volume).
H. Speciated organics, including, but not limited to, Rule 1150.1 Table 1 Carcinogenic and Toxic Air Contaminants ppmv)
I. Total siloxanes (organic silicon compounds) (ppmv).
J. Aldehydes (initial test only) (ppmv).
K. Oxygen (percent by volume)
L. Nitrogen, (percent by volume)
M Moisture Content (percent by volume)
N. Temperature (Fahrenheit)
O. Flow rate of LFG & regen gas (inlet), scfm
P. Flow rate (exhaust), scfm
Q. BTU content (Inlet only), BTU/SCF
[Rule 204, 1150.1, 1303(a)(1)-BACT, 1303(b)(2)-Offset, 3004(a)(4)]
22. This Permit to Construct shall expire if construction of this equipment is not completed within one year from the date of issuance unless an extension is granted by the South Coast AQMD. At least 30 days prior to the expiration date of the Permit to Construct, the operator shall submit a written request for and obtain an extension of time to construct this equipment on an annual basis until such time construction is completed and a written notification has been submitted reporting the date construction was completed and the date operation of the equipment is intended to be operated. Each extension request shall include the following information:
A. The permit number and application number for which an extension is requested.
B. The increments of construction progress that have been completed thus far, with schematics, specification, and/or photos (if available).
C. The increments of construction progress that have yet to be completed for construction to be complete.
D. Explanation and description of any delays or circumstance necessitating the extension.
E. The proposed date of extension being requested for the Permit to Construct. [Rule 205]
23. The operator of this equipment shall submit final as-built specifications (make, model, dimensions, size, maximum capacities) and P&I diagrams to South Coast AQMD (attn: Waste Management Permitting), within 60 days of completing construction of this equipment, unless otherwise approved in writing by South Coast AQMD.
The submittal shall also identify the equipment location, initial operation date, and application number. [Rule 204]
24. All records required by this permit shall be retained at the facility for a minimum of five years, and shall be made available to any South Coast AQMD representative upon request. [Rules 204, 1150.1, 3004(a)(4)]
141 of 153
Section H Page 74
Facility ID: 162556
Revision #: DRAFT 0
Date: TBD
FACILITY PERMIT TO OPERATE
GLENDALE CITY, GLENDALE WATER AND POWER
Emissions and Requirements:
25. This equipment is subject to the applicable requirements of the following Rules and Regulations:
CO: 2000 ppmvd, 15 consecutive minute average, Rule 407 CO: 0.06 lb/MMBtu, Rule 1303(a)(1) BACT/LAER
CO: 0.41 lb/hr, Rule 1303(b)(2) Offsets
NOx: 0.025 lb/ MMBtu , Rule 1303(a)(1) BACT/LAER
NOx: 0.17 lb/hr, Rule 1303(b)(2) Offsets
NMOC: 20 ppmvd as hexane @3% O2 or 98% by weight reduction, Rule 1150.1, 40 CFR 62 Subpart F, 40 CFR 63 Subpart AAAA
ROG 0.038 lb/ MMBtu , Rule 1303(a)(1) BACT/LAER
VOC: 0.30 lb/hr, Rule 1303(b)(2) Offsets
PM Rule 404, See Appendix B for Emission Limits
PM 0.1 grains/dscf, Rule 409
PM/PM10: 6.1 lb/MMscf LFG, Rule 1303(a)(1) BACT/LAER
PM/PM10: 0.13 lb/hr, Rule 1303(b)(2) Offsets
SOx: 0.22 lb/hr (based on LFG combustion only), Rule 1303(b)(2) Offsets 142 of 153
City of Glendale
DISCLOSURE - CAMPAIGN FINANCE ORDINANCE
The City Council adopted Ordinance No. 5744, “Campaign Finance Ordinance,” which became effective on September 9, 2011, and subsequently amended it with Ordinance No. 5768, which became effective on March 15, 2012 and Ordinance No. 5885, which became effective on November 3, 2016 (“the Ordinance”). The Ordinance prohibits: (1) A contractor * (including a subcontractor**)― who has a contract with the City of Glendale (“City”), the Successor Agency (“SA”), or the Housing Authority of the City of Glendale (“HA”) and that contract is subject to approval by the City Council, SA, or HA― from making a contribution to a City Council member, SA member, HA member, City Clerk, or City Treasurer; and (2) Council members, SA members, and HA members from voting on matters concerning a contract with a person who has provided a campaign contribution.
The Ordinance applies to a contractor whose contract requires the City Council’s, SA’s, or HA’s approval. A contract with the City, SA, or HA is known as a “City Contract.” The Ordinance also applies to a subcontractor who has a subcontract through a City Contract. The Ordinance excludes a competitively bid contract awarded to the lowest responsible bidder.
To assist members of the City Council, SA, and HA before they vote on a matter regarding a City Contract, the Ordinance requires City staff to prepare this report which discloses certain information about: the contractor receiving the City Contract, and the subcontractor(s) working under the City Contract.
A contractor must provide the information listed below when: A subcontractor must provide the information listed below when:
The City Contract has a total anticipated or actual value of $50,000 or more; or The subcontract through a City Contract has a total anticipated or actual value of $25,000 or more; or
A combination or series of City Contracts have a value of $50,000 or more. A combination or series of subcontracts, for the same or different projects, have an aggregate value of $25,000 or more.
Information that must be disclosed: ● Name of the person, entity, or organization (i.e., the Contractor or Subcontractor) ● Name of the Chief Executive Officer/President
● Chief Operating Officer
● Chief Financial Officer
● Chairperson
● All members of the Board of Directors
● All persons who own more than 10% of the person, entity, or organization ● Name of any campaign committee owned or controlled by the person, entity, or organization Please complete the following disclosure form:
Contractor(s)*:
Name Address
Full Name Title Business Address City State Zip
Chairperson
Chief Executive Officer / President
Chief Operating Officer
Chief Financial Officer
Board of Directors
More than 10% interest owner
* “Contractor” is the person, entity, or organization that is the party, or prospective party, to the contract with the City, SA, or HA or any member of that person’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Officer, Chief Financial Officer, Chief Operating Officer, any person with an ownership interest of more than ten percent (10%) in that person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.
ACCO Engineered Systems, Inc.
888 E. Walnut Street, Pasadena, CA 91101
Chuck Richter
Jeffrey Marrs
Chuck Darway
John Petersen
See attached BOD
None
888 E. Walnut Street, Pasadena, CA 91101
888 E. Walnut Street, Pasadena, CA 91101
888 E. Walnut Street, Pasadena, CA 91101
888 E. Walnut Street, Pasadena, CA 91101
888 E. Walnut Street, Pasadena, CA 91101
EXHIBIT 2
143 of 153
144 of 153
City of Glendale
DISCLOSURE - CAMPAIGN FINANCE ORDINANCE
The City Council adopted Ordinance No. 5744, “Campaign Finance Ordinance,” which became effective on September 9, 2011, and subsequently amended it with Ordinance No. 5768, which became effective on March 15, 2012 and Ordinance No. 5885, which became effective on November 3, 2016 (“the Ordinance”). The Ordinance prohibits: (1) A contractor* (including a subcontractor**)― who has a contract with the City of Glendale (“City”), the Successor Agency (“SA”), or the Housing Authority of the City of Glendale (“HA”) and that contract is subject to approval by the City Council, SA, or HA― from making a contribution to a City Council member, SA member, HA member, City Clerk, or City Treasurer ; and (2) Council members, SA members, and HA members from voting on matters concerning a contract with a person who has provided a campaign contribution.
The Ordinance applies to a contractor whose contract requires the City Council’s, SA’s, or HA ’s approval. A contract with the City, S A , o r H A i s k n o w n a s a “ C i t y Contract.” The Ordinance also applies to a subcontractor who has a subcontract through a City Contract. The Ordinance excludes a competitively bid contract awarded to the lowest responsible bidder.
To assist members of the City Council, SA, and HA before they vote on a matter regarding a City Contract, the Ordinance requires City staff to prepare this report which discloses certain information about: the contractor receiving the City Contract, and the subcontractor(s) working under the City Contract.
A contractor must provide the information listed below when: A subcontractor must provide the information listed below when:
• The City Contract is subject to City Council approval; or • The subcontract through a City Contract has a total anticipated or actual value of $25,000 or more; or
• A combination or series of City Contracts totaling $50,000 or more is subject to Council approval.
• A combination or series of subcontracts, for the same or different projects , have an aggregate value of $25,000 or more.
Information that must be disclosed: ● Name of the person, entity, or organization (i.e., the Contractor or Subcontractor) ● Name of the Chief Executive Officer/President
● Chief Operating Officer
● Chief Financial Officer
● Chairperson
● All members of the Board of Directors
● All persons who own more than 10% of the person, entity, or organization ● Name of any campaign committee owned or controlled by the person, entity, or organization
Please complete the following disclosure form:
Contractor(s)*:
Name Address
Penn Power Group, LLC dBa Western Energy Systems 8330 State Road, Philadelphia, PA 19136/499 Nibus Street Brea CA 92821 Full Name Title Business Address City State Zip
Justin Jacobi Chairperson 8330 State Road Philadelphia PA 19136 Alfred Clark Chief Executive Officer / President 499 Nibus Street Brea CA 92821 None Chief Operating Officer
Phil Field Chief Financial Officer 8330 State Road Philadelphia PA 19136 See Attached Board of Directors
See Attached More than 10% interest owner
* “Contractor” is the person, entity, or organization that is the party, or prospective party, to the contract with the City, SA, or HA or any member of that person’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Officer , Chief Financial Office r, Chief Op erating Officer, any person with an ownership interest of more than ten percent (10%) in that person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address. 145 of 153
Rev. 11/8/17
Subcontractor(s)**:
Name Address
Full Name Title Business Address City State Zip
Chairperson
Chief Executive Officer / President
Chief Operating Officer
Chief Financial Officer
Board of Directors
More than 10% interest owner
** “Subcontractor” is the person, entity, or organization that has entered into a contract for the performance of all or a portion of the work undertaken under an agreement with an architect, design professional, engineer, or general or prime contract, usually by a general or prime contractor. Subcontractor includes any member of that p erson’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Officer , Chief Financial Of ficer, Chief Op erating Officer, any person with an ownership interest of more than ten percent (10%) in that person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.
Campaign Committee owned or controlled by: There is no campaign committee. We do not make political or lobbying contributions
Title Business Address City State Zip
CERTIFICATION
On behalf of the above-named X Contractor Subcontractor:
• I acknowledge that I have a continuing obligation to update this disclosure form if I substitute― or if I select additional― architects, design professionals, contractors, or subcontractors within ten (10) days of the selection or change; and • I hereby certify that:
I have identified all persons for which the Ordinance requires disclosure; The information in this disclosure form (and any attachment to this form) is true, accurate, correct, and complete; and I have been legally authorized to submit this disclosure form.
In total, this disclosure form (including attachments) is 3 pages.
Executed on: January 18th, 2023 at: , California.
Signature: Print Full Name: Alfred Clark
Address: 499 Nibus Street, Brea, CA 92821
Phone Number: 1-215-435-0242 E-mail Address: [email protected] Al Clark
Digitally signed by Al Clark
Date: 2023.01.18 19:00:27
-05'00'
146 of 153
CAMPAIGN DISCLOSURE
In accordance with the City Campaign Finance Ordinance No. 5744, the following are the names and business addresses of the members of the board of directors, the chairperson, CEO, COO, CFO, Subcontractors and any person or entity with more than 10% interest in the company proposed for contract in this Agenda Item Report:
Officers of Penn Power Group, LLC
1. Alfred Clark
2. Scott Schlereth
3. Philip M Field
Board of Directors- Penn Power Group, LLC
1. Justin Jacobi
2. Robert Monk
3. Mark Raterman
4. Eugene Park
5. Philip Field, Secretary
More Than 10% Ownership Interest in Penn Power Group, LLC dBa Western Energy Systems
1. LNC Partners, Plaza America II 11710 Plaza America Drive, Suite 160, Reston, VA 20190
2. Pantheon Funds, Transamerica Center, 600 Montgomery Street, 23rd Floor, San Francisco, CA 94111
3. Hermes Funds, 55 Fifth Avenue, Suite 1306, New York, NY 10003
147 of 153
City of Glendale
DISCLOSURE - CAMPAIGN FINANCE ORDINANCE
The City Council adopted Ordinance No. 5744, “Campaign Finance Ordinance,” which became effective on September 9, 2011, and amended it with Ordinance No. 5768, which became effective on March 15, 2012 (“the Ordinance”). The Ordinance prohibits: (1) A contractor* (including a subcontractor**)― who has a contract with the City of Glendale (“City”), Economic Development Department (“EDD”), or the Housing Authority of the City of Glendale (“HA”) and that contract is subject to approval by the City Council, EDD, or HA― from making a contribution to a City Council member, EDD member, HA member, City Clerk, or City Treasurer; and (2) Council members, EDD members, and HA members from voting on matters concerning a contract with a person who has provided a campaign contribution.
The Ordinance applies to a contractor whose contract requires the City Council’s, EDD's, or HA’s approval. A contract with the City, EDD, or HA is known as a “City Contract.” The Ordinance also applies to a subcontractor who has a subcontract through a City Contract. The Ordinance excludes a competitively bid contract awarded to the lowest responsible bidder.
To assist members of the City Council, EDD, and HA before they vote on a matter regarding a City Contract, the Ordinance requires City staff to prepare this report which discloses certain information about: the contractor receiving the City Contract, and the subcontractor(s) working under the City Contract.
A contractor must provide the information listed below when: A subcontractor must provide the information listed below when:
•The City Contract has a total anticipated or actual value of $50,000 or more; or • The subcontract through a City Contract has a total anticipated or actual value of $25,000 or more; or
• A combination or series of City Contracts have a value of $50,000 or more. • A combination or series of subcontract s, for the same or different projects, have an aggregate value of $25,000 or
more. Information that must be disclosed: ● Name of the person, entity, or organization (i.e., the Contractor or Subcontractor) ● Name of the Chief Executive Officer/Pre
siden t
● Chief Operating Officer
● Chief Financial Officer
● Chairper
son
● All members of the Board of Directors
● All persons who own more than 10% of the perso
n, entity, or organi zation
● Name of any campaign committee owned or controll ed by the person, entity, or organization Please complete the following disclosure form:
Contractor(s)*:
Name Address
Full Name Title Business Address City State Zip
Chairperson
Chief Executive Officer / President
Chief Operating Officer
Chief Financial Officer
Board of Directors
More than 10% interest owner
*“Contractor” is the person, entity, or organization that is the party, or prospective party, to the contract with the City, EDD, or HA or any member of that person’s, entity’s, or organization’s Board of Direct ors, its Chairperson, Chief Executive Officer, Chief Financial Officer, Chief Operat ing Officer, any person with an ownership interest of more than ten percent (10%) in that person, entit y, or organization, and any campaign committee that is o wned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.
Stantec Consulting Services Inc.
290 Conejo Ridge Avenue, Thousand Oaks CA 91361-4972
N/A
Gordon A. Johnston
400-10220 103 Avenue NW
Edmonton
AB
T5J 0K4
Stuart E. Lerner
475 Fifth Avenue 12th Floor
New York
NY
10017-7239
Theresa Jang
400-10220 103 Avenue NW
Edmonton
AB
T5J 0K4
Sutart E. Lerner and Jeffrey P. Stone
Stu Lerner address above / Jeff Stone (61 Commerical Street Suite 100) Rochester
NY
14614-1009
Mustang Acquisition Holdings Inc.
370 Interlocken Boulevard, Suite 200
Broomfield
CO
80021-8009
148 of 153
Rev. 6/7/12 J:\FILES\DOCFILES\ORD\CAMPAIGN CONTRIBUTION\DISCLOSURE FORM – CONTRACTOR – 6-7-12.doc Subcontractor(s)**:
Name Address
Full Name Title Business Address City State Zip
Chairperson
Chief Executive Officer / President
Chief Operating Officer
Chief Financial Officer
Board of Directors
More than 10% interest owner
** “Subcontractor” is the person, entity, or organization that has entered into a contract for the performance of all or a portion of the work undertaken under an agreement with an architect, design professional, engineer, or gener al or prime contract, usually by a general or prime contrac tor. Subcontractor includes any member of that person’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Officer, Chief Financ ial Officer, Chief Operating Officer, any person with an ownership interest of more than ten percent (10%) in that person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.
Campaign Committee owned or controlled by:
Title Business Address City State Zip
CERTIFICATION
On behalf of the above-named Contractor Subcontractor:
• I acknowledge that I have a continuing obligation to update this disclosure form if I substitute― or if I select additional ― architects, design professionals, contractors, or subcontractors within ten (10) days of the selection or change; and • I hereby certify that:
I have identified all persons for which the Ordinance requires disclo sure; The information in this disclosure form (and any attachment to this form) is true, accurate, correct, and complete; and I have been legally authorized to su bmit this disclosure form.
In total, this disclosure form (including attachments) is pages.
Executed on: , 20 , at: , California.
Signature: Print Full Name:
Address:
Phone Number: E-mail Address:
N/A
2 July 13
22 Thousand Oaks
StephAnnie Roberts
290 Conejo Ridge Ave
805-719-9332
[email protected]
Roberts, StephAnnie
Digitally signed by Roberts, StephAnnie
Date: 2022.07.13 13:22:05 -07'00'
149 of 153
City of Glendale
DISCLOSURE - CAMPAIGN FINANCE ORDINANCE
The City Council adopted Ordinance No. 5744, “Campaign Finance Ordinance,” which became effective on September 9, 2011 , and subsequently amended it with Ordinance No. 5768, which became effective on March 15, 2012 and Ordinance No. 5885, which became effective on November 3, 2016 (“the Ordinance”). The Ordinance prohibits: (1) A contractor* (including a subcontractor**)― who has a contract with the City of Glendale (“City”), the Successor Agency (“SA”), or the Housing Authority of the City of Glendale (“HA”) and that contract is subject to approval by the City Council, SA, or HA― from making a contribution to a City Council member, SA member, HA member, City Clerk, or City Treasurer ; and (2) Council members, SA members, and HA members from voting on matters concerning a contract with a person who has provided a campaign contribution.
The Ordinance applies to a contractor whose contract requires the City Council’s, SA’s, or HA ’s approval. A contract with the City, SA, or HA is known as a “City Contract.” The Ordinance also applies to a subcontractor who has a subcontract through a City Contract. The Ordinance excludes a competitively bid contract awarded to the lowest responsible bidder.
To assist members of the City Council, SA, and HA before they vote on a matter regarding a City Contract, the Ordinance requires City staff to prepare this report which discloses certain information about: the contractor receiving the City Contract, and the subcontractor(s) working under the City Contract.
A contractor must provide the information listed below when: A subcontractor must provide the information listed below when:
• The City Contract has a total anticipated or actual value of $50,000 or more; or • The subcontract through a City Contract has a total anticipated or actual value of $25,000 or more; or
• A combination or series of City Contracts have a value of $50,000 or more. • A combination or series of subcontracts, for the same or different projects , have an aggregate value of $25,000 or more.
Information that must be disclosed: �� Name of the person, entity, or organization (i.e., the Contractor or Subcontractor) �� Name of the Chief Executive Officer/President
�� Chief Operating Officer
�� Chief Financial Officer
�� Chairperson
�� All members of the Board of Directors
�� All persons who own more than 10% of the person, entity, or organization �� Name of any campaign committee owned or controlled by the person, entity, or organization
Please complete the following disclosure form:
Contractor(s)*:
Name Address
Full Name Title Business Address City State Zip
Chairperson
Chief Executive Officer / President
Chief Operating Officer
Chief Financial Officer
Board of Directors
More than 10% interest owner
* “Contractor” is the person, entity, or organization that is the party, or prospective party, to the contract with the City, SA, or HA or any member of that person’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Office r, Chief Financial Officer, Chief Operating Officer, any person with an ownership interest of more than ten percent (10%) in th at person, entity, or organization , and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address. 150 of 153
Rev. 11/8/17
Subcontractor(s)**:
Name Address
Full Name Title Business Address City State Zip
Chairperson
Chief Executive Officer / President
Chief Operating Officer
Chief Financial Officer
Board of Directors
More than 10% interest owner
** “Subcontractor” is the person, entity, or organization that has entered into a contract for the performance of all or a portion of the work undertaken under an agreement with an architect, design professional, engineer, or general or prime contract, usually by a general or prime contractor. Subcontractor includes any member of that p erson’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Office r, Chief Financial Officer, Chief Operating Officer, any person with an ownership interest of more than ten percent (10%) in th at person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.
Campaign Committee owned or controlled by:
Title Business Address City State Zip
CERTIFICATION
On behalf of the above-named Contractor Subcontractor:
• I acknowledge that I have a continuing obligation to update this disclosure form if I substitute�� or if I select additional�� architects, design professionals, contractors, or subcontractors within ten (10) days of the selection or change; and • I hereby certify that:
▪ I have identified all persons for which the Ordinance requires disclosure; ▪ The information in this disclosure form (and any attachment to this form) is true, accurate, correct, and complete; and ▪ I have been legally authorized to submit this disclosure form.
In total, this disclosure form (including attachments) is pages.
Executed on: , 20 , at: , California.
Signature: Print Full Name:
Address:
Phone Number: E-mail Address:
Digitally signed by Robert J Martin
DN: cn=Robert J Martin, c=US, o=Worley,
[email protected]
Date: 2023.01.19 12:04:13 -05'00'
151 of 153
Attachment A – Worley Board of Directors
Name Business Address City State Zip
Andrew Liveris Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Thomas Gorman Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Anne Templeman-Jones Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Roger Higgins Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Wang Xiao Bin Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Sharon Warburton Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Christopher Haynes Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Juan Suárez Coppel Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Emma Stein Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
Martin Parkinson Energy Center II, 575 N Dairy
Ashford Rd.
Houston TX 77079
152 of 153
153 of 153