Adopted
04/02/24
Kassakhian/Brotman
Absent: Devine, Najarian ORDINANCE NO. _ 6_0_2_5_
AN ORDINANCE OF THE COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA AMENDING ORDINANCE NO. 6016 ESTABLISHING THE ELECTRIC RATES FOR GLENDALE WATER & POWER FOR FISCAL YEARS 2024 TO 2027 TO ADD THE
STANDBY SERVICE RIDER FOR MEDIUM BUSINESS DISPATCHABLE AND THE
STANDBY SERVICE RIDER FOR LARGE BUSINESS DISPATCHABLE RATES WHEREAS, the City of Glendale, through the Glendale Water & Power Department ("GWP"), operates a municipal utility for the distribution of electrical energy to the residents of the City of Glendale; and
WHEREAS, the last increase to the electric rates was implemented by GWP in 2018; and
WHEREAS, on November 14, 2023, GWP presented the City Council with proposed electric rates for Fiscal Years 2024 through 2027; and WHEREAS, on November 28, 2023 the Glendale City Council adopted Ordinance No. 6016 implementing electric rates which took effect on January 1, 2024; and
WHEREAS, although the Cost Of Service Analysis (GOSA) included, and considered as part of the proposed rates, four specific rates providing a unique Standby Service Rider option for standard Medium LD-2 and Large Business PC- 1 including Time-of-Use (TOU) customers, during the implementation of the new electric rates it was noted that new rates for the Standby Service - Medium Business Dispatchable and Standby Service - Large Business Dispatchable were not included in the rate tables attached to Ordinance No. 6016; and WHEREAS, historically GWP has not had any customers on the standard Standby Service Medium Business dispatchable LD-2 and the Standby Service Large Business Dispatchable PC-1 rates; however, there are expected to be a small group of such customers utilizing the unique rates and services beginning in 2024 as explained in the Report dated March 26, 2024 to the City Council, and as such these rates were considered and included in the GOSA; arid WHEREAS, GWP is also proposing some additional edits to the Standby Service Rider which would provide needed benefits and cost savings to the customer through a monthly peak demand instead of a ratcheted 12 month peak demand and proposing extending the standby service rider to the Medium Business Dispatchable and Large Business Dispatchable TOU LD2B and PC1 B rates, which were not included in the adopted GOSA and omitted from Ordinance No. 6016, to allow the co-generation customers the option to be on a standard or 7a
TOU standby service rider and benefit from the monthly peak demand and the annual saving it may provide; and
WHEREAS, the City Council has considered the reports and testimony of staff and the comments of the public regarding the same; and WHEREAS, the COSA and proposed rate plan reflect previously approved law and legislative direction of the present and former City Councils including: (i) the requirements of Article XI, Section 22 of the Glendale City Charter, which was approved by the voters in 1949 and has remained in the City Charter since that date; and (ii) the Public Benefits Charge set forth in Section 13.44.425 of the Glendale Municipal Code, which was first approved in 1997 as required by state law and subsequently amended in 1998, 1999, 2001, 2006 and 2008 and has remained in the Glendale Municipal Code, 1995 ("GMC") without change since 2008; and
WHEREAS, the proposed electric service rates and charges, as set forth in Ordinance 6106 and as amended by this Ordinance, have been calculated on the basis of the reasonable costs incurred by GWP to provide electric service to GWP's customers; and
WHEREAS, the proposed electric service rates and charges constitute charges imposed for one or more of the following reasons: (1) a specific City benefit conferred or privilege granted (California Constitution, Article XIIIC, §1 (e)(1 )) and/or (2) a City service or product (California Constitution, Article XIIIC, §1 (e)(2)).
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE
CITY OF GLENDALE:
SECTION 1. Notice of public meetings at which this Ordinance was considered was properly given, and all oral and written presentations made to and heard by the City Council were properly considered.
SECTION 2. There is a reasonable relationship between the rates to be charged for the provision of various City. services and the City's costs in providing those services.
SECTION 3. The amended Electric Rates attached hereto as Exhibit "1":
a) Do not exceed the actual or estimated reasonable costs to the City for providing the services to which the fees related; b) Are reasonable and necessary to enable the City to provide the benefit or privilege, service or product to which they related; and 2 c) Have been allocated in a manner such that the costs to the payor bear a fair and reasonable relationship to the payor's burden on, or benefits received, from the City.
SECTION 4. Since 2006, the City's electric rates have included a lawful tax equal to 9.42 percent of the electric utility's costs of service. The electric rates approved through this Ordinance temporarily decrease that tax to 7.60 percent.
This temporary decrease shall expire on June 30, 2028.
SECTION 5. Compliance with California Environmental Quality Act.
The City Council finds and determines that this Ordinance is not subject to the California Environmental Quality Act ("CEQA"). Pursuant to CEQA Guidelines Section 15273, CEQA does not apply to the establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, and other charges by public agency which the public agency finds are for the purpose of (1) meeting operating expenses including employee wage rates and fringe benefits, (2) purchasing or leasing supplies equipment or materials, (4) meeting financial reserve needs and requirements, for obtaining funds for capital projects necessary to maintain service within existing service areas, or (5) obtaining funds necessary to maintain such intra-city transfers are authorized by City Charter. As set forth in the Report Dated March 26, 2024 by the General Manager of GWP the electric rate increases which were approved via Ordinance No. 6106 and those which are being recommended for approval are for the express purposes of meeting existing operating expenses of GWP, purchasing supplies, equipment or materials necessary to operate the utility, funding certain capital improvements necessary to supply electricity to the residents and businesses within Glendale's service area, and to ensure the Glendale City Charter authorized intra-city transfer can be maintained.
SECTION 6. The City Council hereby adopts the amendments proposed herein and the electric rate schedule as set forth in Exhibit "1", attached hereto and incorporated herein by reference.
SECTION 7. Severability. This Ordinance is adopted under the authority of the Charter of the city of Glendale and State law. If any section, subsection, clause or phrase is declared invalid or otherwise void by a court of competent jurisdiction, it shall not affect any remaining provision hereof. In this regard the City Council finds and declares that it would have adopted this measure notwithstanding any partial invalidity hereof.
SECTION 8. Effective Date. This Ordinance shall take effect and be in force thirty (30) days after the date of its passage.
3 : '
Passed by the Council of the City of Glendale on the 2nd day of April , 2024.
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS.
CITY OF GLENDALE )
I, Suzie Abajian Ph.D., City Clerk of the city of Glendale, certify that the foregoing Ordinance No. 6025 was passed by a majority vote of the Council of the city of Glendale , California, at a regular meeting held on the 2nd day of April , 2024, and that the same was passed by the followed vote.
Ayes:
Noes:
Asatryan , Brotman, Kassakhian
None
Absent:
Abstain:
Devine, Najarian
None
APPROVED AS TO FORM
~4L/JMI
cr~TTORNEY
DATE 4 /t )/2-1
4 Item Unit
Customer ME!ter/Day
Energy kWh
High Season - First 10 kWh/day
High Season - Next 10 kWh/day
High Season• REmaining kWh
Low Season • First 10 kWh/day
Low Season - Next 10 kWh/day
Low Season - Remaining kWh
ECAC kWh
RAC kWh
RDC kWh
Hl£h.SHson are mcmths JWy, Auguslp September,. October
Low Sea1-on art mO(lths Navamberthrough June
Item Unit
Customer Meter/Day
Energy kWh
High Season - Base
High Season• Peak
Low SE!ason - Base
Low Season - Peak
ECAC kWh
RAC kWh
RDC kWh
Noto: Th"'• rates alsi> ar,ply to Residential SOlarTOU {L•l-EJ.
HlchSeason ilrt month.s Julr. Au1:wt. September. Oc:tgbf:r lc.wSH::ian=tre month, HovamberthrouahJUnl'
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:
Residential Service L-1-A
Current Rate
Phase1 Pha51! 2
Decl,2023 Jul 1, 2024
$0.64 $0,70 $0.75
$0.1661 $0.2481 $0.2863
$0.2059 $0.3075 $0.3549
$0.2459 $0.3673 $0.4238
$0.1393 $0.2081 $0.2401
$0.1725 $0.2577 $0.2973
$0.2128 $0.3179 $0.3668
$0.0001 $0.0000 $0.0000
$0.0250 $0.0000 $0.0000
$0.0159 $0.0000 $0.0000
Current and Proposed Electric Rates:
Residential Seivice L•l•B
Current Rate
Phase1 Phase 2
Decl,2023 Jul 1,2024
$0.82 $0.70 $0.75
$0.1227 $0.1870 $0.2141
S0.3681 $0.5610 $0.6423
$0.1023 $0.1559 $0.1785
$0.3068 $0.4676 $0.5353
$0.0001 $0.0000 $0.0000
$0.0250 $0.0000 $0.0000
$0.0159 $0.0000 $0.0000
Proposed Rates
Phase 3 Phase4 Phases
JUI 1, 2025. Jul 1, 2026 Jull,2027
$0.75 $0.75 $0.75
$0.3335 $0,3335 $0.3335
$0.4134 $0.4134 $0.4134
$0.4937 $0.4937 $0.4937
$0.2797 $0.2797 $0.2797
$0.3464 $0.3464 $0.3464
$0.4273 $0.4273 $0.4273
$0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000
Proposed Rates
Phase3 Phase4 Phases
Jul 1, 2025 Jul 1, 2026 Jull, 2027
$0.75 $0.75 $0.75
$0.2456 $0.2456 $0.2456
$0.7368 $0.7368 $0.7368
$0.2048 $0.2048 $0.2048
$0.6141 $0.6141 $0.6141
$0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000
SO.ODDO $0.0000 $0.0000
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates: Small Business L•2•A Item Unit
Customer Meter/Day
Energy kWh
High Season
Low Season
ECAC kWh
RAC kWh
RDC kWh
No1e:Thestrote• ,r,oapplytoSmall B1111ne,,Salar(L-2-C].
Hle;h Suson 1ti1t mcnth.s Juty, Au1ust. S~ptembcr., October law Se,ason are mcmtks Ncn1en,btrthrou9hJune
Item Unit
Customer Meter/Day
Energy kWh
High Season - Base
High Season - Peak
Low Season - Base
low Season - Peak
ECAC kWh
RAC kWh
RDC kWh
Noto! These rates alM apply lo Sm>II Bu,ine .. SolarTDU (l•2•Dl.
Hich Sitasan are months.Ju~, Allli:u1t, S&ptembar, October LowSc.11.so-1"111re mc.r,ths Novemterthro1.1chJ1.1.n1t
Current
Rate Phase 1 Phase 2
Deel, Ji.ill, 2024
2023
$0.62 $0.80 $1.00
$0.1841 $0.2674 $0.2993
$0.1595 $0.2317 $0.2593
$0.0001 $0.0000 $0.0000
$0.0250 $0.0000 $0.0000
$0.0159 $0.0000 $0.0000
Current and Proposed Electric Rates:
Small Business L-2-B
Current
Rate Phasel Phase 2
Deel, Jull,2024
2023
$1.33 $0.80 $1.00
$0.1040 $0.1681 $0.1899
$0.3119 $0.5041 $0.5695
$0.0800 $0.1293 $0.1461
$0.2399 $0.3878 $0.4380
$0.0001 $0.0000 $0.0000
$0.0250 $0.0000 $0.0000
$0.0159 $0.00D0 $0.0000
Current and Proposed Electric Rates:
Medium Business LD•2•A
Item Unit Current Rate
Customer Meter/Day
Energy kWh
High Season
Low Season
Demand kW
High Season
Low Season
ECAC kWh
RAC kWh
RDC kWh
Nole: Those ratu alsoapplr 10 Meoftim Bu,rneu Sol,r (L0-2-C).
Hirhsea,on are montl,. Jutv. J.u1u,1, September. Ocrobor Loi,,iSl!Hi:tn :ar ■ months rJovem'bnt'hra-u,1hJune
Sl.00
$0.0847
$0.0810
$0.99
$0.69
$0.0001
SD.0250
$0.0159
Phase 1 1 Phase2
Decl,2023 Jull,2024
$1.25 Sl.50
$0.1441 $0.1583
$0.1378 $0.1514
$1.04 $1.08
$0.72 $0.75
$0.0000 SO.ODDO
$0.0000 SD.DODO
$0.0000 $0.0000
Proposed Rates
Phase3
Jull,2025
$1.25
$0.3312
$0.2869
$0.0000
$0.0000
$0.0000
Proposed Rates
Phase3
Jull,2025
$1.25
$0.2126
$0.6376
$0.1635
$0.4904
$0.0000
$0.0000
$0.0000
Proposed Rates
Phase3
Jul 1, 2025
$1.70
$0.1707
S0.1632
$1.15
$0.80
$0.0000
$0.0000
$0.0000
Phase4 Phase 5
Jul 1, 2026 Jull,2027
$1.25 $1.25
$0.3312 $0.3312
$0.2869 $0.2869
$().0000 $0.0000
$0.0000 $0.0000
$0.0000 $0.0000
Phase4 Phase S
Jul 1, 2026 Jul 1,2027
$1.25 $1,25
$0.2126 $0.2126
$0.6376 $0.6376
$0,1635 $0.1635
$0.4904 $0.4904
$0.0000 $0.0000
$0.0000 $0.000D
$0.0000 $0.0000
Phase 4 Phase 5
Jull,2D26 Jul l, 2D27
$1.70 Sl.70
$0.1707 $0.1707
$0.1632 $0.1632
$1.15 $1.15
$0.80 $0.80
$0.0000 $0.0000
$0.0000 $0.0000
$0.0000 $0.0000
Item
Customer
Reservation Charge
Supplemental Service Charge
Energy High Season
Energy Low Season
Demand High Season
Demand Low Season
Backup Service Charge
Energy Charge
Demand High Season
Demand Low Season
ECAC
RAC
RDC
Note:
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:
Standby Service Rider: Medium Business Dispatchable
Current
Proposed Rates
Unit Rate Phase 1 Phase 2 Phase3
Deel, 2023 Jul 1, 2024 Jull,2025
Meter/Day $1.00 $1.25 $1.50 $1.70
kW/day $0.54 $0.54 $0.54 $0.54
kWh $0.0847 $0.1441 $0.1583 $0.1707
kWh $0.0810 $0.1378 $0.1514 $0.1632
kW/day $0.99 $1.04 $1.08 $1.15
kW/day $0.69 $0.72 $0.7S $0.80
kWh See LD-2-A See LD-2-A See LD-2-A See LD-2-A
kW/day $0.45 SD.SO $0.54 $0.61
kW/day $0.15 $D.18 $0.21 $0,26
kWh $0.0001 $0.0000 $0,0000 $0.0000
kWh $0.0250 $0.0000 $0.0000 $0.0000
kWh $0.0159 $0.0000 $0.0000 $0.0000
1. Customer charge Is applied to each meter installed for Standby Service.
Phase4 Phases
Jul 1,2026 Jul 1,2027
$1.70 $1.70
$0.54 $0.54
$0.1707 $0.1707
$0.1632 $0.1632
$1.15 $1.15
$0.80 $0.80
See LD-2-A See L0-2-A
$0.61 $0.61
$0.26 $0.26
$0.0000 $0.0000
$0.0000 $0.0000
$0.0000 $0.0000
2. Reservation Charge is a monthly charge applied to the contracted amount of standby capacity, typically aligned with generation capacity (kW) of the customer-owned generation resource.
3. Supplemental Service Charge is only applicable to the portion of power and energy required by and delivered to the customer in excess of the customer self-generation. This charge aligns with the standard LD-2-A charges exc~pt as noted for demand charges.
4. Demand rates are determined by the maximum demand reading in the prior billing period (e.g., month)
5. Sackup Service Charge is appllcable during an unscheduled outage of the customer-owned generation resource and applied to the demand and energy consumption typically served by the customer-owned generation.
The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and
13.44.280 of the Glendale Municipal Code.
The PBC applies to all charges per Section
13.44.425 of the GMC.
The UUT applies to all charges per Section 4.36.030 of the GMC Current and Proposed Electric Rates:
Item Unit Current Rate
Customer Meter/Day $1.11
Energy kWh
High Season-Base $0.0823
High Season - Peak $0.2423
Low Season - Base $0.0823
Low Season - Peak $0.1455
Demand kW
High Season $0.58
Low Season $0.48
ECAC kWh $0.0001
RAC kWh $0.0250
RDC kWh $0.0159
Note: Thosorat•• also apptv •• Modi um ewJnm Solar TOU (LD·2·DJ.
HiJh S1150n .1rl! months.July,. A'UIUSt., S.pte:mbar.,. Oi::t11be-r Lci-wS-easa-nnre montNI Nc:ivember1hrou.rhJune
Medium Business LD-2-B
Phase 1 Phase 2
Decl,2023 Jul 1, 2024
$1.25 $1.50
$0.1268 $0.1374
$0.3733 $0.4045
$0.1268 $0.1374
$0.2242 $0.2429
$0.61 $0.63
so.so $0.52
$0.0000 So.0000
$0.0000 $0.0000
$0.0000 So.0000
Proposed Rates
Phase3 Phase 4 Phases
Jul 1, 202S Jul 1, 2026 Jull,2027
$1.70 $1.70 $1.70
$0.1479 $0.1479 $0.1479
$0.4354 $0.4354 $0.4354
$0.1479 $0.1479 $0.1479
$0.2615 $0.2615 $0.2615
$0.67 $0.67 $0.67
$0.SS $0.55 $0.55
$0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000
Item
Customer
Reservation Charge
Supplemental Service Charge
Energy
High Season - Base
High Season - Peak
Low Season - Base
Low Season - Peak
Demand
High Season
Low Season
Backup Service Charge
Energy Charge
Demand High Season
Demand Low Season
ECAC
RAC
RDC
Note:
EXHIBIT1
Electric Rate Tables
Proposed Electrlc Rates:
Standby Service Rider: Medium Business Dispatchable TI me Of Use (TOUJ Proposed Rates
Unit Current
Rate Phase l Phase2 Phase3
Decl,2023 Jul 1,2024 Jul l, 2025
Meter/Day $1.11 $1.25 $1.50 $1.70
kW/day $0.54 $0.54 $0.54 $0.54
kWh
$0.0823 $0.1268 $0.1374 $0.1479
$0.2423 $0.3733 $0.4045 $0.4354
$0.0823 $0.1268 $0.1374 $0.1479
$0.1455 $0.2242 $0.2429 $0.2615
kW/day
SO.SB $0.61 $0.63 $0.67
$0.48 $0.50 $0.52 $0.55
kWh See LD-2-B See LD-2-B See LD-2-B See LD-2-8
kW/day $0.45 so.so $0.54 $0.61
kW/day $0.15 $0.18 $0.21 $0.26
kWh $0.0001 $0.0000 $0.0000 $0.0000
kWh $0,0250 $0.0000 $0.0000 $0.0000
kWh $0.0159 $0.0000 $0.0000 SO.DODO
1. Customer chSJge is applied to each meter installed for Standb-f SeNice.
Phase 4 Phases
Jull,2026 Jul 1, 2027
$1.70 $1.70
$0.54 $0.54
$0.1479 $0.1479
$0.4354 $0.4354
$0.1479 $0.1479
$0.2615 $0.2615
$0.67 $0.67
$0.55 $0.55
See LD-2-B See LD-2-B
$0.61 $0.61
$0.26 $0.26
$0.0000 $0.0000
$0.0000 $0.0000
$0.0000 $0.000D
2 Reservallon Charge is a month¥ charge applied to the contracted amount of standby capaci'ly, typically algn&d with generatiCDl capactty !kW) al the customer-owned generation resource.
3. Supplemental Service Charge iS only appfcable lo the portion of power and energy required by and delivered lo the customer in excess of the customer self-generation.
This charge au;i ns Wilh the standard TOU L0-2-B charges except as noted for demand charges.
4. Demand rates are determined by the maximum demand reading in the current billing period (e.g., month)
5. Backup Service Charge is applicable durtng an unscheduled outage or the customer-owned generation resource and appied to the demand and ene19Y consumption typically served by the customer-owned generation.
The ECAC, RAC, RDC will be calcu!aled and applied per Se:Hons 13.44.260, 13.44.270, and 13.44 .280 of the Glendale Municipal Code.
The PBC applies to all charges per Section 13.44.425 oftheGMC.
The UUT applies to all charges per Section4.36.030 oflhe GMC Item Unit
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:
Medium Business PC-1-A
current Rate P reposed Rates
Phase1 Phase2 Phase 3 Phase4 Phase 5
Decl,2023 Jul 1, 2024 Jult,2025 Jull,2026 Jul 1, 2027
Customer Meter/Day $5.82 $7.00 $9.00 $10.50 $10.50 $10.50 Energy kWh
High Season $0,0695 $0.1345 $0.1513 $0.1698 $0.1698 $0.1698 Low Season $0.0628 $0.1215 $0.1367 $0.1534 $0.1534 $0.1534 Demand kW
High Season $1.19 $1.25 $1.32 $1.40 $1.40 $1.40
Low Season $0.90 $0.95 $1.00 $1.06 $1.06 $1.06
Reactive Power kVAR $0.004 $0.006 $0.008 $0.010 $0.010 $0.010 ECAC kWh $0.0001 $0,0000 $0.0000 so.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.D000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note: These rates also apply to large Business Solar {PC-1-Q.
High Season are months July, August, September, October Low Season are months November through June
Current and Proposed Electric Rates:
Standby Service Rider: Large Business Dispatchable
I
Item Unit I Current Phase1 Phase2
I
Rate Decl,2023 Jul 1, 2024
Customer Meter/Day SS.82 $7.00 $9.00
Reservation Charge kW/day $0.64 $0.64 $0.64
Supplemental Service
Charge
Energy High Season kWh $0.0695 $0.1345 $0.1513
Energy low Season kWh $0.0628 $0.1215 $0.1367
Demand High Season kW/day $1.19 $1.25 $1.32
Demand Low Season kW/day $0.90 $0.95 $1.00
Reactive Power Charge kVAR/Day $0.004 $0.006 $0.008
Backup Service Charge
Energy Charge kWh See PC·l-A See PC-1-A See PC-1-A
Demand High Season kW/day $055 $0.61 $0.68
Demand Low Season kW/day $0.26 $0,31 $0.36
Reactive Power Charge kVAR/Oay See PC-1-A See PC-1-A See PC-1-A ECAC kWh S0.0001 $0.0000 $0.0000
RAC kWh $0.0250 $0.0000 $0.0000
RDC kWh $0.0159 $0.0000 $0.0000
Note:
1. Customer charge is applied to each meter installed for Standby Service.
Proposed Rates
Phase3 Phase4 Phase S
Jul 1, 2025 Jul 1, 2026 Jul 1,2027
$10.50 $10.50 $10.50
$0.64 $0.64 $0.64
$0.1698 $0.1698 $0.1698
$0.1534 $0.1534 $0.1534
$1.40 $1.40 $1.40
$1.06 $1.06 $1.06
$0.010 S0.010 $0.010
See PC-1-A See PC-1-A See l'C-1-A
$0.76 $0.76 $0.76
$0.42 $0.42 $0.42
See PC-1-A See PC-1-A See PC-1-A
$0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000
$0.0000 $D.0000 $0.0000
2. Reseivalion Charge is a monlhly charge applied to the contracted amount of standby capacity, typically algned wilh generaliOn capacity (kW) of tile customer owned generation resource.
3. Supplemental Service Charge is only applicable to the portion of power and energy required by and delivered lo lhe customer in excess of the customer self. generation. This charge aligns wilh the standard PC-1-A charges except as noted for demand charges.
4. Demand rates are determined by lhe maximum demand reading in the current billing period (e.g., month)
5. Backup Se/Vice Charge is applicable during an unscheduled outage of the customer-owned generation resource and applied 10 the demand and energy consumption typically setved by the customer-owned generation.
The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and 13.44.280 of the Glendale Municipal Cocle.
The PBC appfies to all charges per Section 13.44.425 of the GMC.
The UUT applies to all charges per Section4.36.030 of the GMC Item Unit
Customer Meter/Day
Energy kWh
High Season - Base
High Season-Peak
Low Season - Base
Low Season - Peak
Demand kW
High Season
Low Season
Reactive Power kVAR
ECAC kWh
RAC kWh
RDC kWh
LowSusonare months Novemberthrough Iunt!
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:
Large Business PC-1-S
Current Rate
Phase 1 Phase 2
Dec 1, 2023 Jull,2024
$5.82 $7.00 $9.00
$0.0714 S0.1194 $0.1322
$0.2008 $0.3358 $0.3718
$0.0714 $0.1194 $0.1322
$0.1163 $0.1945 $0.2153
$0.82 $0.86 $0,91
$0.58 $0.61 $0.64
$0.004 $0.006 $0.008
$0.0001 $0.0000 $0.0000
$0.0250 $0.0000 SO.ODDO
$0.0159 $0.D000 $0.0000
Pro p0s11d Electric Rates:
Proposed Rates
Phase 3
Jul l, 2025
$10.50
$0.1463
$0.4114
$0.1463
$0.2383
$0.96
$0.68
$0.010
$0.0000
$0.0000
$0,0000
Standby Service Rider: Large Business Dispatchable Time of Use {TOUI P reposed Rates
Item Unit Current Rate Phase 1 Phase 2 Phase 3
Dec 1, 2023 Jull,2024 Jul 1, 2025
customer Meter/Day $5.82 $7.00 $9.00 S10.50
Reservation Charge kW/day $0.64 $0.64 $0.64 $0.64
Supplemental Service Charge
Energy kWh
High Season - Base $0.0714 $0.1194 $0.1322 $0.1463
High Season - Peak $0.2008 $0,3358 $0.3718 $0.4114
Low Season • Base $0.0714 $0.1194 $0.1322 $0.1463
Low Season - Peak $0.1163 $0.1945 $0.2153 $0.2383
Demand kW/day
High Season $0.82 $0.86 $0.91 $0.96
Low Season $0.58 $0.61 $0.64 $0.68
Reactive Power kVAR/Day $0.004 $0.006 $0.008 $0.010
Backup Service Charge
Energy Charge kWh See PC-1-B See PC-1-6 See PC-1-B See PC-1-6 Demand High Season kW/day $0.55 $0.61 $0.68 $0.76
Demand Low Season kW/day $0.26 $0.31 $0.36 $0.42
Reactive Power Charge kVAR/Oay See PC-1-B See PC-1-B See PC-1-8 See PC•l-B ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000
RAC kWh $0,0250 $0.0000 $0.0000 $0.0000
RDC kWh $0.0159 $0.0000 $0.0000 $0.000D
Note:
1. Customer charge is applied to each meter installed for Standby Service.
Phase 4 Phase 5
Jull, 2026 Jul 1, 2027
$10,50 $10.SO
S0.1463 $0.1463
$0.4114 $0.4114
$0.1463 $0.1463
$0.2383 $0.2383
$0.96 $0.96
$0.68 $0.68
$0.010 $0.010
$0.0000 $0.0000
$0.0000 $0.0000
$0.0000 $0.0000
Phase4 Phase S
Jul 1, 2026 Jul 1, 2027
$10.50 $10.50
S0.64 $0.64
$0.1463 $0.1463
$0.4114 $0.4114
$0.1463 $0.1463
$0.2383 $0.2383
$0.96 $0.95
$0.68 $0.68
$0.DlO $0.010
See PC·l-6 See PC-1-B
$0.76 $0.76
$0.42 $0.42
See PC-1-8 See PC-1-B
$0.0000 $0.00D0
$0.0000 $0.0000
$0.0000 $0.0000
2. Reservation Charge is a monthly charge applied to the contracted amount of standby capacity, typically aligned with generation capacity (kW) of the customer-owned generation resource.
3. Supplemental Service Charge is only applicable to the portion of power and energy required by and delivered to the customer in excess of the customer self-generation. This charge aligns with the standard PC-l·B charges except as noted for demand charges.
4. Demand rates are determined by the maximum demand reading in the current billing period (e.g., month)
5. Backup Service Charge is applicable during an unscheduled outage of the customer-owned generation resource and applied to the demand and energy consumption typically served by the customer-owned generation.
The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and 13.44.280 of the Glendale Municipal Code.
The PBC applies to all charges per Section 13.44.425 of the GMC.
The UUT applies to all charges per Section 4.36.030 of the GMC