C
I
T
Y
O
F
G
L
E
N
D
A
L
E
,
C
A
F
I
R
E
S
E
R
V
I
C
E
S
M
A
S
T
E
R
P
L
A
N
V
O
L
U
M
E
4 O
F
4 :
F
A
C
I
L
I
T
I
E
S
A
S
S
E
S
S
M
E
N
T
M
A
R
C
H
2 7
,
2 0
2 4
6 0
0 C
O
O
L
I
D
G
E
D
R
I
V
E
,
S
U
I
T
E
1 5
0 F
O
L
S
O
M
,
C
A
9 5
6 3
0 P
H
O
N
E
:
(
9 1
6 )
4 5
8 -
5 1
0 0
F
A
X
:
(
9 1
6 )
9 8
3 -
2 0
9 0
W
W
W
.
C
I
T
Y
G
A
T
E
A
S
S
O
C
I
A
T
E
S
.
C
O
M
F
I
R
E
&
E
M
S
F
I
R
E
&
E
M
S
This page was intentionally left blank
Glendale Fire Department
Fire Services Master Plan Assessment (DRAFT)
Table of Contents Page i
TABLE OF CONTENTS
Section Page
Fire Station Condition Assessment ..............................................................................................................................1 Fire Station Assessment Overview ...................................................................................................................1 Key Themes ........................................................................................................................................1 Regulatory Standards ........................................................................................................................................2 California Building Code ...................................................................................................................2 Americans with Disabilities Act (ADA) ............................................................................................2 California Essential Services Buildings Seismic Safety Act (ESBSSA) ...........................................3 NFPA 1500 .........................................................................................................................................3 NFPA 1851 .........................................................................................................................................4 NFPA 1710 .........................................................................................................................................4 Industry Standards ............................................................................................................................................4 Response .............................................................................................................................................4 Community Presence and Access.......................................................................................................5 Safety – Vehicular Circulation ...........................................................................................................5 Safety – Hazardous Material Decontamination..................................................................................6 Public To Private Separation ..............................................................................................................6 Security ..............................................................................................................................................6 Equity And Inclusion..........................................................................................................................7 Culture ..............................................................................................................................................7 Facility Condition Criteria ................................................................................................................................7 Fire Station Assessment ....................................................................................................................................8 Assessment Findings ......................................................................................................................................11 Assessment Recommendations .......................................................................................................................12 Table of Tables
Table 1—Overall Facility Condition Criteria ................................................................................................................ 8 Table 2—Fire Station Assessment Summary ................................................................................................................ 8 Appendices
Appendix A—Citygate Facility Evaluation Forms
Appendix B—Fire Station Priority List
Appendix C—Support Services Facility Assessments
Appendix D—Fire Station Seismic Inspections and Analysis
This page was intentionally left blank
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 1
FIRE STATION CONDITION ASSESSMENT
FIRE STATION ASSESSMENT OVERVIEW
The City of Glendale (City) requested Citygate Associates, LLC (Citygate) to conduct a Fire Services Master Plan Assessment. The scope of work for this study included an on-site assessment of Glendale Fire Department (Department) stations, a facility records review, and staff interviews as appropriate to identify key findings and make recommendations based on an operational and fire executive management perspective.
The following Department fire stations were visited by Citygate and reviewed for conformance with current California Building Code standards, the California Essential Services Act, Americans with Disabilities Act (ADA) standards, and National Fire Protection Association ( NFPA) standards—with a focus on health, safety, privacy, and access for all Department personnel:
Fire Station 21 – 421 Oak St.
Fire Station 22 – 1201 S. Glendale Ave.
Fire Station 23 – 3303 E. Chevy Chase Dr.
Fire Station 24 – 1734 Canada Blvd.
Fire Station 25 – 353 N. Chevy Chase Dr.
Fire Station 26 – 1145 N. Brand Blvd.
Fire Station 27 – 1127 Western Ave.
Fire Station 28 – 4410 New York Ave.
Fire Station 29 – 2465 Honolulu Ave.
Citygate’s on-site assessments of the fire stations were to confirm conditions against the available records and oral history, and to assess their conformance with both (1) the applicable standards cited in the section to follow and (2) recognized best practice employee health and safety standards.
Key Themes
1. Out of 9 fire stations, three are more than 50 years old and three are more than 60 years old. The stations are dated and showing signs of significant wear and tear despite the best efforts of maintenance staff.
2. All of the fire stations but Fire Station 21 are undersized by modern fire service standards.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
3. Most of the fire stations are not compliant with current Building Code, ADA , or NFPA standards, and the stations were built before the Essential Services Buildings Seismic Safety Act of 1986.
4. All fire station sleeping, locker room, and restroom facilities were developed based on historically all-male fire crews and lack gender inclusion and privacy.
5. All fire stations need structural modification to comply with the California Building Code for Seismic Activity per an independent Property Seismic Inspection and Analysis conducted in 2020 by Wheeler & Gray Consulting Engineers.
6. Plymovent diesel truck exhaust systems are not functional in all apparatus bays of multiple stations due to incomplete conversion from pneumatic to magnetic release latches to the apparatus.
REGULATORY STANDARDS
California Building Code
The International Code Council launched the International Codes Series (I-codes) at the end of the 1990s as a singular replacement for the regional building codes. Locally, the California Building Code is borne out of the International Building Code and lo cal jurisdictions adopt the California Building Code as their own guidance.
The International Building Code provides a tiered approach for the required structural performance of a building and, as essential facilit ies, fire stations are subject to the strictest structural requirements. While an office building is required to be built to protect life in the event of a disaster—which means the occupants survive but the building may be condemned —a fire station must be designed to protect life and be immediately occupiable post -disaster. This means a fire station will be better able to resist the shaking of an earthquake or the high winds of an unusual storm.
Americans with Disabilities Act (ADA)
The ADA, enacted in 1990, establishes a series of standards for accessibility for persons with identified disabilities (e.g., 2010 ADA Standards). Requirements for fire stations as public buildings are scoped under Title 2 of the ADA, and public facilities are subject to higher accessibility standards than commercial and residential developments.
With a few exceptions for building support spaces, fire station facilities, as Title 2 public buildings, are required to be fully accessible for disabled staff and the public. Cogent arguments have been made for why some areas within a fire station, such as a sleeping room, should not be considered “public” or “accessible.” Similarly convincing cases have been made relative to the mandatory Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 3
fitness requirements for firefighters. Nonetheless, the ADA law is clear: spaces are not exempt based on a policy that excludes persons with disabilities from certain work, and a fire facility is considered a public building in its entirety.
California Essential Services Buildings Seismic Safety Act (ESBSSA) In 1986, the California Legislature determined that buildings providing essential services should be capable of providing those services to the public after a disaster. Their intent in this regard was defined in legislation known as the Essential Services Buildings Seismic Safety Act of 1986 and includes requirements that such buildings shall be:
“Designed and constructed to minimize fire hazards and to resist… the forces generated by earthquakes, gravity, and winds” (Excerpt from Health and Safety Code section 16001).
The enabling legislation can be found in the California Health and Safety Code, Chapter 2, sections 16000 through 16022. In addition, the California Building Code cited above defines how the intent of the act is to be implemented in Title 24, Part 1 of the California Building Standards Administrative Code, Chapter 4, Articles 1 through 3. Only three of the City’s 9 fire stations were built as Essential Services facilities (Fire Station 21, Fire Station 22, and Fire Station 25).
NFPA 1500
NFPA 1500 – Standard on Fire Department Occupational Safety, Health, and Wellness Program is a non-mandated, generally accepted best practice consensus standard for fire station design relative to cancer prevention, firefighter fitness, and space for firefighters to unwind from the stresses of the job.
Newly built fire stations include differential air pressure zones where positive-pressure airflow or an air curtain can prevent contaminants in the apparatus bays from entering the station living and work areas.
Since departments are required to have fitness programs, many departments opt for a separate physical fitness space. Indoor and outdoor fitness areas have been used when space is limited; however, they should have easy access to the apparatus bays in the e vent of a dispatch while exercising.
Training rooms allow crews to learn about the latest firefighting, EMS, and safety and health programs, so ample space that provides a functional learning space is part of this standard.
Personal protective equipment (PPE) needs to be stored in areas away from the sun and with little fluorescent lighting. The space also needs ventilation to remove particulates from the area and needs to be physically isolated from indoor living, sleeping, and work areas. Most of the PPE storage spaces in Glendale fire stations are in the apparatus bays.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
NFPA 1851
NFPA 1851 – Standard on Selection, Care, and Maintenance of Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting provides non -mandated, consensus best practice guidelines for the maintenance and care of firefighter PPE. This standard recommends separate laundry facilities for contaminated PPE from facilities used to launder personal clothing/uniforms, bedding, and bath towels. Laundry areas continue to evolve and are being separated so that personal belongings can be cleaned in the living areas and PPE can be laundered in a separate room or adjacent to the apparatus bays. In so doing, contaminated PPE does not enter the living spaces of the facility. Only some of the laundry spaces at Glendale fire stations are in the apparatus bays.
NFPA 1710
NFPA 1710 – Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments provides guidelines for fire station design to include access to the apparatus bays from first and second floor (as applicable) interior living/work areas.
INDUSTRY STANDARDS
Fire departments have the primary goals of providing safe, responsive service to the communities they serve while providing a safe environment for firefighters to work in. There are industry-wide design practices common to fire departments across the country that help ensure facilities assist departments in achieving these goals.
Response
Fire station s are located with in communities based on careful analysis of the response times required to reach different locations in a service area and provide service within set , standard timeframes. Location is the first criteria to support response. Site circulation across the front apron and connection to roadways determines the ability of apparatus to respond rapidly once firefighters are in a vehicle. Clear lines of sight , and traffic control at busy roadways , contribute to fast response. Alerting systems with clear signalization and visual /audible direction provide firefighters with the information they need to respond. Apparatus bay doors that operate quickly and automatically allow the apparatus to exit the station when the crew is ready. A plan layout of the facility should be organized to provide firefighters with direct access to the apparatus bay from all areas of the station as quickly as possible. Priority should be given to the areas the firefighters may be in most, such as office areas and living areas. Sleeping areas should be prioritized with a direct path to the apparatus bay as longer internal response to the apparatus occurs when the firefighters are sleeping. Areas that may need to be visited as part of response should be placed on Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 5
the path to that apparatus bay, such as radio charging stations and response alcoves providing information for the call.
Community Presence and Access
A fire station is a connection to the community to provide service and a destination for assistance and care for those in danger. The fire station should be accessible to the community. Parking and walkways to the lobby of the station and emergency phone s hould follow ADA requirements to allow all members of the community to be able to approach the station for assistance. Many of Glendale’s fire stations are joined with a library, thereby increasing the probability of public interaction. Glendale fire stations are also surrender sites under California’s Safely Surrendered Baby program. Station site configuration, building orientation, and exterior facade should provide a clear understanding of the location a community member should go to receive help, often the primary entry of the facility.
Safety – Vehicular Circulation
Site pathways and features should provide access and direction from the parking and pedestrian way to the pedestrian entry without crossing the path of department vehicle response. This provides community safety and more rapid response ability. When a stat ion’s front apron is near a street sidewalk, the apron should have enough depth for fire apparatus to be fully out of the station with the ability to stop before entering the roadway without blocking the pedestrian way. In cases where this is not possible, warning beacons and paving marking are recommended for pedestrians during a response.
Response Egress and Roadway Entry
Traffic analysis should be performed on roadways upon which fire stations respond. Traffic control or notification devi ces may be required depending on lines of sight or traffic volumes. Some conditions may need “ Keep Clear” striping to avoid vehicles blocking egress of the apparatus if near an intersection where vehicles may be stopped. Flashing beacons may be needed to alert oncoming vehicles that a response is occurring if there is impairment to the line of sight. Con trol of adjacent signalization may be required to clear and control an adjacent intersection as the apparatus is entering.
Return Drive-Through
Apparatus should have a safe means of returning and entering the apparatus bay of a fire station.
Whenever possible, providing drive -through capability for all apparatus is the safest process for returning to the station. This requires adequate circulation to the rear of the station to enter through rear bay doors, avoiding any reason to back the vehicle up, which is a higher-risk maneuver. Only in circumstances where there is no other option —and when there is a front apron that is large enough to allow for a safe , three-point back-in operation without utilizing the public roadway — Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
should a back-in return be considered. Careful site planning and warning features should be used to separate any public visitor vehicles or pedestrians from the back -in area if this is to occur.
Bollards should be located at door entry points and around items to protect on-site equipment.
Safety – Hazardous Material Decontamination
Firefighter health and safety is a top priority to protect personnel from the hazardous materials that they encounter when fighting fires and from the vehicle exhaust of apparatus. A facility can encourage the proper decontamination process a firefighter must follow when returning from a call. Placing the decontamination room, turnout cleaning , and turnout storage along a linear and unobstructed path to the apparatus bay supports the process of decontamination and turnout cleaning prior to entering the apparatus bay. The addition of hand-washing sinks and boot-cleaning stations at any entrance to the living area , in addition to the decontamination zone , helps firefighters maintain a clean living area called a “Clean Zone,” which is separate from the “Hot Zone” of the apparatus bay and support area.
A facility should also provide an air-lock vestibule as a “Transition Zone” at the connection points of the “Clean” and “Hot” zones to keep vehicle exhaust from the apparatus bay from infiltrating the firefighters’ living and sleeping quarters. Firefighter processes for decontamination when returning from a call and when entering the “Clean” living area will help protect the long -term health of the firefighters living at the station. At the same time, the station layout can encourage these proper cleaning processes to help embed healthy practices into the culture of the department.
Public To Private Separation
Fire stations are not only a beacon and refuge to the community in times of emergency, they are also home to the firefighters while on duty. A separate lobby space should be provided to allow for the public to come to the station. This lobby should be secure and separate from the private living area of the fire station. Ideally, the office function of the fire station should be as close as possible to the lobby so that on-duty firefighters can monitor the lobby . This design layout also provides a transition from the public space to the public interaction office area to the living area.
Security
The building and site of a fire facility should be secure from theft and unauthorized visitors to protect equipment and personnel so they can perform their service to the community unhindered.
Special equipment is a valuable asset to the community and requires special training to operate.
The rear apron provides an area to locate this equipment , as well as for the parking of personal vehicles of the firefighters on duty. This area should be protected with a security fence and vehicle gate. Visitor entry and parking can be located outside this secure fence. The entry of the building itself should have a lobby with a secure door that allows visitors to come to the station without Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 7
having access to the firefighter living areas. This allows firefighters to serve the community in a safe way.
Equity And Inclusion
Traditional fire stations provided facilities that had limited privacy , with open floor plans in dormitories, locker rooms, and restrooms. This reduced the opportunity for a diverse staff by not providing equitable and inclusive accommodations. The traditional , open-dorm fire station sleeping and restroom facilities were developed based on historically all-male fire crews. For fire departments to be inclusive and recruit, retain , and support a diverse staff, facilities that accommodate all must be provided. Private sleeping areas and individual private restrooms and showers allow for any firefighter to maintain equitable living conditions. This encourages diversity within the department by providing a facility that has a layout that is inclusive to all.
Culture
Because the profession of firefighting relies heavily on the collaboration and teamwork of each crew to be able to perform together and live together in the firehouse, the opportunities for privacy should be balanced with spaces that encourage the continue d culture of collaboration as a team.
The apparatus bay and apparatus support spaces are areas where firefighters work together in daily duties on the job. The living area should be configured to foster informal, casual, and more formal collaboration with areas of meeting, relaxing and eating together. The kitchen, dining , and day room areas should be organized to maintain the traditional collaborative culture of the fire department, while the firefighter sleeping areas should provide equitable space to allow each firefighter to maintain their own desired level of privacy.
FACILITY CONDITION CRITERIA
The following table lists the criteria Citygate utilized to base its evaluation at each facility.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Table 1—Overall Facility Condition Criteria
Condition General Criteria
Excellent
• Less than 10 years old
• Design and space meet current and anticipated future operational needs • Meets health and safety requirements for human habitation/use • Building or major systems require only minor routine maintenance to maintain continued operational use
• No near-term capital improvement / renewal needs anticipated Good
• Design and space adequate for current and anticipated near-future operational needs • Meets health and safety requirements for human habitation/use • Building or major systems require regular routine maintenance/repairs to maintain continued operational use
• May require some capital improvement / renewal over next five years Fair
• Design and space may not meet current/anticipated future operational needs • May have some health and safety issues relative to human habitation/use • Building or major systems require more than routine maintenance/repairs to maintain continued operational use
• Major capital improvement / renewal needed or anticipated in near future Poor
• Design and space do not meet current/anticipated future operational needs • May have health and safety issues relative to human habitation/use • Building or major systems require frequent major repairs to maintain continued operational use
• Major capital improvement / restoration needed for continued operational use
FIRE STATION ASSESSMENT
The following table summarizes Citygate’s assessment of Department Fire Stations . Detailed evaluation forms for each facility are found in Appendix A.
Table 2—Fire Station Assessment Summary
Facility Condition Comments
Fire
Station 21 Fair
• Although a large station, there is limited ability to expand the number of offices, restrooms, dormitories, and kitchen within the current footprint. • Limited parking when all of staff is on duty.
• Showing wear and tear in many areas.
• Dormitories and restrooms should be reconfigured for better gender inclusion and privacy.
• HVAC temperature control is inadequate to provide consistent temperature in all dorm rooms.
• Electrical panels are unable to support required load in some areas. • Additional washer/dryers are needed for decontamination. • Has 2 fire poles for rapid egress from second floor.
• Currently houses a Battalion Chief vehicle, Truck, Type I Engine, BLS Ambulance (2 at night), USAR vehicle, and a Type III Engine.
• Room for 3 reserve Engines or 1 TDA Truck and 1 Engine.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 9
Facility Condition Comments
Fire
Station 22 Fair
• Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
• Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
• Fire station shares the lot with the Fire Mechanical Maintenance Facility managed by Glendale Public Works.
• Extractor and additional washer/dryers are needed for PPE decontamination. • Remove carpet and replace with polished concrete.
• Has 1 fire pole from rapid egress from second floor.
• Currently houses a Type I Engine, and Rescue Ambulance. • Room for 1 reserve Engine.
Fire
Station 23 Fair
• Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
• Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
• Station is very worn.
• Fire station shares lot with a self-serve library.
• Library air-conditioning unit in front of fire station dorm window. • No security gates.
• Remove carpet and replace with polished concrete where applicable. • Extractor and additional washer/dryers are needed for PPE decontamination. • Currently houses a Type I Engine.
• No room for additional apparatus.
Fire
Station 24 Poor
• Station is vastly undersized by modern fire service standards in many aspects including apparatus floor, living quarters, kitchen.
• Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
• Dedicated physical fitness space is outside station in carport beside the station. • No station security and parking.
• Currently houses a Type I Engine and a Type 1 Hazardous Material Response Vehicle.
• No room for additional apparatus.
• Extractor and additional washer/dryers needed for PPE decontamination.
Fire
Station 25 Fair
• Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
• Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
• Station is very worn. Porous stone veneer around station with water seeping through stone to inside.
• A stoplight signal with station switch would be beneficial. Dangerous traffic. Automatic apparatus door closer broken.
• Very small parking lot could be reconfigured for more space. • Remove carpet and replace with polished concrete where applicable. • Extractor and additional washer/dryers are needed for PPE decontamination. • Currently houses a Type I Engine and a Rescue Ambulance. • Room for 1 Engine.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Facility Condition Comments
Fire
Station 26 Poor
• Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, kitchen, and physical fitness space is in apparatus bay.
• Dormitories and restrooms should be reconfigured as soon as possible for better gender inclusion and privacy.
• Station is very worn despite routine maintenance. Kitchen recently remodeled. • Remove carpet throughout station and replace with polished concrete where applicable. Possible asbestos flooring tiles under carpet. • No station security and parking security when library is open. • Extractor and additional washer/dryers are needed for PPE decontamination. • Currently houses a Type I Engine, TDA Truck, and Rescue Ambulance. • No additional room for apparatus.
Fire
Station 27 Poor
• Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, kitchen, and physical fitness space is in apparatus bay.
• Station is very worn despite routine maintenance.
• Dormitories and restrooms should be reconfigured as soon as possible for better gender inclusion and privacy.
• Station can only accommodate daily 12-hour BLS ambulance due to lack of available dormitories.
• Reconfigure kitchen. Remove food cabinets and move water heater. • Remove carpet and do polished concrete where applicable. • Extractor and additional washer/dryers are needed for PPE decontamination. • Currently houses a Type 1 Engine and Rescue Ambulance. • No additional room for apparatus.
Fire
Station 28 Poor
• Station is vastly undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen. • Station is very worn. Water seeping through walls in front of station office, dorm, and through roof in numerous areas.
• Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
• HVAC system is significantly unbalanced in Captain’s dorm related to the rest of the north side of the station (same HVAC system and controls). • Physical Fitness room in detached building to rear of station. • Extractor needed.
• Remove carpet and replace with polished concrete where applicable. • Currently houses a Type I Engine and an Air /Light Unit. • No additional room for apparatus.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 11
Facility Condition Comments
Fire
Station 29 Poor
• Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen. Needs a major reconfiguration. • Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy. Bedding storage in a separate area.
• Station is very worn. Poke through tiles throughout station. • Extractor and additional washer/dryers are needed for PPE decontamination. • Two fire poles.
• No security gates for parking. Next to library.
• Remove carpet and replace with polished concrete where applicable. • Currently houses a Type I Engine, TDA Truck, Rescue Ambulance, OES Type II Engine, and a Water Tender.
• No additional room for apparatus.
ASSESSMENT FINDINGS
Citygate’s key findings related to the Department’s facilities are as follows. They are numbered in the same manner as their placement in Volume 1—Technical Report.
Finding #30: Out of nine fire stations, three are more than 50 years old and three are more than 60 years old. The stations are dated and showing signs of significant wear and tear despite the best efforts of maintenance staff.
Finding #31: All City fire stations, with the exception of Station 21, are undersized by modern fire service standards.
Finding #32: Most of the City’s fire stations are not compliant with current Building Code, ADA, or NFPA standards, and were built before the Essential Services Buildings Seismic Safety Act of 1986.
Finding #33: All fire station sleeping, locker room, and restroom facilities were developed based on historically all-male fire crews and lack gender inclusion and privacy.
Finding #34: All fire stations need structural modification to comply with the California Building Code for Seismic Activity—per an independent Property Seismic Inspection and Analysis conducted in 2020 by Wheeler & Gray Consulting Engineers.
Finding #35: Plymovent diesel truck exhaust systems are not functional in all apparatus bays of multiple stations due to incomplete conversion from pneumatic to magnetic release latches to the apparatus.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Finding #36: The training tower and related props need some major repairs and/or updating.
ASSESSMENT RECOMMENDATIONS
Citygate’s recommendations to address these findings are as follows . They are numbered in the same manner as their placement in Volume 1—Technical Report.
Recommendation #14: The City must prioritize fire stations for substantial remodels or replacement. Citygate recommends the three
following reconstruction phases. As execution of these
phases will require several years, in each phase and order, some stations will require minor remodeling to “buy
time” for the Department’s facility needs.
Phase 1 – Rebuild stations 29, 28 and 26.
Phase 2 – Rebuild stations 23, 24 and 27.
Phase 3 – Update and remodel (where needed) stations
21, 22, and 25.
Recommendation #15: Select and hire a veteran fire station design firm to prepare building and site plans and provide actual design- based construction cost estimates.
Recommendation #16: City finance staff can explore multi -year financing strategies (e.g., General Obligation Bonds, Certificates of Participation, and Lease-Back arrangements, etc.) so that adequate consideration is given to their possible benefits or consequences.
Recommendation #17: Replacement and remodeling must include solutions for finding adequate space for physical fitness in areas away from listed carcinogens produced by fire apparatus.
Recommendation #18: Fire station living spaces should be designed to accommodate personnel of all gender identities.
Glendale Fire Department
Fire Services Master Plan Vol. 4—Facilities Assessment
Fire Station Condition Assessment Page 13
Recommendation #19: Building components throughout the City’s fire stations need to be upgraded with new equipment such as station
alerting, overhead doors, traffic warning signal lights at doors or close by, and high -efficiency HVAC that
provides comfortable work and living spaces. Remove
carpet and replace with polished concrete where
applicable.
Recommendation #20: Coordinate with the City Facilities Management Division to affect needed repairs/updating of the training tower and related training props.
This page was intentionally left blank
APPENDIX A
CITYGATE FACILITY EVALUATION
FORMS
This page was intentionally left blank
FACILITY ASSESSMENT
Fire Station 21
Address: 421 Oak St.
Ownership: City of Glendale
Parcel Size (acres) 1.86
Building Size (sq. ft.) 51,500
Number of Stories 3 above, 1 below
Building Age (years) 29
Daily Staffing Min. 12 Max. 12
Number of Apparatus Min. 7 Max. 12
Apparatus Bays Indoor: 7 Outdoor: 7
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X
Backup Electrical
Generator X Size: 550 KW Fuel: Diesel
On-Site Vehicle Fueling X
Facility
Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust
Capture System X
PPE allowed in
living/sleeping areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
features X
Station Alerting System
Conformance with
NFPA 1500
X
Carcinogen
Contamination Control
Zones
X
PPE Storage
Conformance with
NFPA 1851
X
Has ventilation in storage room
Dedicated PPE
Cleaning Equipment X 1 extractor for entire Department Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X
Dedicated EMS
Equipment/Supply
Storage
X
Secured Building
Access X
Secured Employee
Parking X
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC frequent Poor Dampers, temp regulation uneven
Roof frequent Poor Apparatus floor leaks. EMS building leaks Asphalt Surfaces n/a Concrete
Standby Generator 2023 Original Poor Function tested monthly and serviced annually SCBA Air Compressor 10 years Good
PPE Extractor 10 years Poor Only extractor in Department Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 4 695 Yes No
Restroom(s) X 5 997 No No
Sleeping
(bedrooms/beds)
X 12 1,248 No No
Kitchen/Dining X 1 1,280 No No
Living Area / Day
Room
X 1 873 No No
Physical Fitness
Workout Space
X 1 884 No No
Storage Space X 4 1,364 Yes No
Workshop X 1 183 Yes No
Training Room X 1 1,500 Yes Yes
SCBA Storage X 1 118 Yes No
SCBA Refill Station X 1 30 Yes No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X 7 9,800 Yes Yes
Front Apparatus Apron X 7 N/A Yes Yes
Rear Apparatus Apron /
Parking
X ? N/A No No
Comments/Recommendations
Overall Facility Condition: Fair
Although a large station, there is limited ability to expand the number of offices, restrooms, dormitories, and the kitchen within the current footprint. Limited parking when all of staff is on duty. Showing wear and tear in many areas.
Dormitories and restrooms should be reconfigured for better gender inclusion and privacy.
Additional extractors and washer/dryers are needed for PPE decontamination Electrical panels are unable to support required load in some areas.
Two fire poles for rapid egress
Multiple 2½” water supplies in the rear of the station (used for drill and filling apparatus) were disconnected over 15 years ago when a repair was made to the building fire protection system.
FACILITY ASSESSMENT
Fire Station 22
Address: 1201 S. Glendale Ave
Ownership: City of Glendale
Parcel Size (acres) .55
Building Size (sq. ft.) 12,000
Number of Stories 2
Building Age (years) 33
Daily Staffing Min. 6 Max. 6
Number of Apparatus Min. 2 Max. 3
Apparatus Bays Indoor: 2 Outdoor: 2
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X Downstairs bathroom
Backup Electrical
Generator X Size: Unk Fuel: Diesel
On-Site Vehicle Fueling X
Facility Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust Capture
System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with NFPA
1500
X
Carcinogen
Contamination Control
Zones
X
PPE Storage
Conformance with NFPA
1851
X
Need ventilation
Dedicated PPE Cleaning
Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X Sent to EMS section
Dedicated EMS
Equipment/Supply
Storage
X
Secured Building Access X
Secured Employee
Parking X
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Fair
Roof Fair Leaks around skylights
Asphalt Surfaces N/A Concrete
Standby Generator original Fair Shared with Fire Shop Maintenance Facility Function tested monthly and serviced annually
SCBA Air Compressor
(NONE)
N/A
PPE Extractor
(NONE)
N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 1 332 Yes No
Restroom(s) X 4 450 No No
Sleeping
(bedrooms/beds)
X 5/7
3-single, 2-shared
780 No No
Kitchen/Dining X 1 310 No No
Living Area / Day Room X 1 388 No No
Physical Fitness
Workout Space
X 1 436 No No
Storage Space X 5 432 Yes No
Workshop X 1 181 Yes No
Training Room X N/A No No
SCBA Storage X N/A No No
SCBA Refill Station X N/A No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X 2 2,416 No No
Front Apparatus Apron X 2 N/A No No
Rear Apparatus Apron /
Parking
X 1 N/A No No
Comments/Recommendations
Overall facility Condition: Fair
Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
Dormitories lockers and restrooms should be reconfigured for better gender inclusion and privacy.
Additional extractors and washer/dryers are needed for PPE decontamination Fire station shares the lot with the Fire Mechanical Maintenance Facility managed by Glendale Public Works.
Fire pole
Remove carpet and replace with polished concrete
FACILITY ASSESSMENT
Fire Station 23
Address: 3303 Chevy Chase Dr.
Ownership: City of Glendale
Parcel Size (acres) .49
Building Size (sq. ft.) 4,500
Number of Stories 1
Building Age (years) 51
Daily Staffing Min. 4 Max. 4
Number of Apparatus Min. 1 Max. 1
Apparatus Bays Indoor: 1 Outdoor: 1
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X No ADA Bathroom
Backup Electrical
Generator X Size: 30KW Fuel: Diesel
On-Site Vehicle Fueling X
Facility
Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust
Capture System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with
NFPA 1500
X
Carcinogen
Contamination Control
Zones
X
PPE Storage
Conformance with
NFPA 1851
X
Open lockers on apparatus floor.
Dedicated PPE
Cleaning Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X Sent to EMS Section
Dedicated EMS
Equipment/Supply
Storage
X
Small storage room
Secured Building
Access X
Secured Employee
Parking X
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Poor Extension cord in driveway to power HVAC
Roof Poor Dry Rot, Leaks, Termite
Asphalt Surfaces N/A Concrete
Standby Generator 2023 Excellent Function tested monthly and serviced annually SCBA Air Compressor
(NONE)
N/A
PPE Extractor
(NONE)
N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 1 160 No No
Restroom(s) X 1 112 No No
Sleeping
(bedrooms/beds)
X 3/4 596 No No
Kitchen/Dining X 1 210 No No
Living Area / Day
Room
X 1 392 No No
Physical Fitness
Workout Space
X 1 436 No No
Storage Space X 1 8 No No
Workshop X 1 74 No No
Training Room X N/A No No
SCBA Storage X N/A No No
SCBA Refill Station X N/A No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X 2 912 No No
Front Apparatus Apron X 2 N/A No No
Rear Apparatus Apron /
Parking
X 2 N/A No No
Comments/Recommendations
Overall facility Condition: Poor
Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
Dormitories are not private (curtains in front). Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
Additional extractors and washer/dryers are needed for PPE decontamination Fire station shares lot with a self-serve Library
Station is very worn. Library air-conditioning unit in front of fire station dorm window. No Security Gates.
Remove carpet and replace with polished concrete
Some original overhead doors that are heavy and prone to breaking.
FACILITY ASSESSMENT
Fire Station 24
Address: 1734 Canada Blvd
Ownership: City of Glendale
Parcel Size (acres) .48
Building Size (sq. ft.) 5200
Number of Stories 1
Building Age (years) 59
Daily Staffing Min. 4 Max. 4
Number of Apparatus Min. 2 Max. 2
Apparatus Bays Indoor: 2 Outdoor: 0
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X
Backup Electrical
Generator X Size: 29 KW Fuel: Diesel
On-Site Vehicle Fueling X
Facility
Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust
Capture System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with
NFPA 1500
X
Carcinogen
Contamination Control
Zones
X
PPE Storage
Conformance with
NFPA 1851
X
Dedicated PPE
Cleaning Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X
Dedicated EMS
Equipment/Supply
Storage
X
Secured Building
Access X
Secured Employee
Parking X
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Good
Roof Fair
Asphalt Surfaces N/A Concrete
Standby Generator Good Function tested monthly and serviced annually SCBA Air Compressor None N/A
PPE Extractor None N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated Future
Needs
Office/Workspace X 1 230 NO NO
Restroom(s) X 1 104 NO NO
Sleeping
(bedrooms/beds)
X 2/4
1-single, 1-shared
450 NO NO
Kitchen/Dining X 1 201 NO NO
Living Area / Day
Room
X 1 264 NO NO
Physical Fitness
Workout Space
(outdoor)
X N/A NO NO
Storage Space X 2 130 NO NO
Workshop X 1 51 NO NO
Training Room X N/A NO NO
SCBA Storage X N/A NO NO
SCBA Refill Station X N/A NO NO
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X 2 1,200 YES NO
Front Apparatus Apron X 2 1,000 YES NO
Rear Apparatus Apron /
Parking
X 0 NO NO
Comments/Recommendations
Overall facility Condition: POOR
Station is vastly undersized by modern fire service standards in many aspects including apparatus floor, living quarters, kitchen, and physical fitness is outside station in carport beside the station.
Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
No station security and inadequate parking for on-duty personnel due to all workout equipment being outside and under carport.
Station is very worn despite routine maintenance.
Remove carpet throughout station and replaced with polished concrete where applicable Workout equipment is unsecured in the parking area with limited protection from the elements.
FACILITY ASSESSMENT
Fire Station 25
Address: 353 Chevy Chase Dr
Ownership: City of Glendale
Parcel Size (acres) .37
Building Size (sq. ft.) 10,500
Number of Stories 2
Building Age (years) 35
Daily Staffing Min. 6 Max. 6
Number of Apparatus Min. 2 Max. 2
Apparatus Bays Indoor: 2 Outdoor: 0
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X ADA Restroom
Backup Electrical
Generator X Size: 31KW Fuel: Diesel
On-Site Vehicle Fueling X
Facility
Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust
Capture System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with
NFPA 1500
X
Carcinogen
Contamination Control
Zones
X
PPE Storage
Conformance with
NFPA 1851
X
Open lockers. Need ventilation. Need more lockers.
Dedicated PPE
Cleaning Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X Sent to EMS Section
Dedicated EMS
Equipment/Supply
Storage
X
Secured Building
Access X
Secured Employee
Parking X Very small lot. Ice Bears should be eliminated or moved.
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Fair Need more thermostats
Roof Fair
Asphalt Surfaces N/A Concrete
Standby Generator 2023 2019 Excellent Function tested monthly and serviced annually SCBA Air Compressor
(NONE)
N/A
PPE Extractor
(NONE)
N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 1 359 Yes No
Restroom(s) X 3 486 No No
Sleeping
(bedrooms/beds)
X 5/7
1,067 No No
Kitchen/Dining
(undersized)
X 1 418 No No
Living Area / Day
Room
X 1 356 Yes No
Physical Fitness
Workout Space
X 1 426 No No
Storage Space X 5 52 No No
Workshop X 1 220 No No
Training Room X N/A No No
SCBA Storage X N/A No No
SCBA Refill Station X N/A No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X X 1
2,450 No No
Front Apparatus Apron X 2 N/A No No
Rear Apparatus Apron /
Parking
X 0 N/A No No
Comments/Recommendations
Overall facility Condition: Fair
Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy.
Additional extractors and washer/dryers are needed for PPE decontamination Very small parking lot could be reconfigured for more space.
Station is very worn. Porous stone veneer around station with water seeping through stone to inside.
Remove carpet and replace with polished concrete where applicable.
A stoplight signal with station switch is needed due to dangerous traffic. Automatic apparatus door closer broken.
Second side apparatus bay is not drive-through due to limited parking for station utility vehicle and personnel’s vehicles.
FACILITY ASSESSMENT
Fire Station 26
Address: 1145 N. Brand Blvd
Ownership: City of Glendale
Parcel Size (acres) .29
Building Size (sq. ft.) 9,200
Number of Stories 2
Building Age (years) 72
Daily Staffing Min. 10 Max. 10
Number of Apparatus Min. 3 Max. 3
Apparatus Bays Indoor: 3 Outdoor: 3
Assessment Factor Finding
Essential Services Facility Yes No Unknown or
N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X
Backup Electrical Generator X Size: 29KW Fuel: Diesel On-Site Vehicle Fueling X
Facility Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust Capture
System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with NFPA 1500 X
Carcinogen Contamination
Control Zones X Doors to apparatus bay should be sealed.
PPE Storage Conformance
with NFPA 1851 X Partial apparatus bay and designated room.
Dedicated PPE Cleaning
Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical Waste
Disposal X
Dedicated EMS
Equipment/Supply Storage X
Secured Building Access X
Secured Employee Parking X Gate open when Library open Annual Safety Inspections X Last Inspection: Oct. 1, 2023 Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Poor Rusted cabinets from condensation in front office Roof Poor
Asphalt Surfaces N/A Concrete cracks
Standby Generator 2020 Excellent Function tested monthly and serviced annually SCBA Air Compressor None N/A
PPE Extractor None N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 2 302 No No
Restroom(s) X 3 325 No No
Sleeping (bedrooms/beds) X 10 1,200 No No
Kitchen/Dining X 1 532 No No
Living Area / Day Room X 1 285 No No
Physical Fitness Workout
Space (app bay)
X No No
Storage Space X 2 102 No No
Workshop X 1 96 No No
Training Room X No No
SCBA Storage X No No
SCBA Refill Station X No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through Apparatus Bays X 1 of 3 2,150 No No
Front Apparatus Apron X 2 670 Yes No
Rear Apparatus Apron /
Parking
X 0 No No
Comments/Recommendations
Overall facility Condition: POOR
Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, kitchen, and physical fitness space is in apparatus bay.
Station is very worn despite routine maintenance. Kitchen recently remodeled No station security and parking security when library is open.
Remove carpet throughout station. Possible asbestos under carpet.
Inadequate parking for personnel during shift change.
FACILITY ASSESSMENT
Fire Station 27
Address: 1127 Western Ave
Ownership: City of Glendale
Parcel Size (acres) .31
Building Size (sq. ft.) 4,600
Number of Stories 1
Building Age (years) 55
Daily Staffing 4+2
(12 hour BLS)
Min. 4 Max. 4
Number of Apparatus Min. 2 Max. 2
Apparatus Bays Indoor: 2 Outdoor: 0
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X No ADA
Backup Electrical
Generator X Size: 31KW Fuel: Diesel
On-Site Vehicle Fueling X
Facility
Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust
Capture System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with
NFPA 1500
X
Carcinogen
Contamination Control
Zones
X
Day room door should be sealed.
PPE Storage
Conformance with
NFPA 1851
X
Apparatus bay
Dedicated PPE
Cleaning Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X
Dedicated EMS
Equipment/Supply
Storage
X
Secured Building
Access X
Secured Employee
Parking X
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Poor Does not cool kitchen and laundry/storage area to an acceptable level.
Roof Fair
Asphalt Surfaces N/A Concrete cracks
Standby Generator 2023 2019 Excellent Function tested monthly and serviced annually SCBA Air Compressor None N/A
PPE Extractor None N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 1 155 No No
Restroom(s) X 1 98 No No
Sleeping
(bedrooms/beds)
X 2/4
1-single, 1-shared
405 No No
Kitchen/Dining X 1 202 No No
Living Area / Day
Room
X 1 320 No No
Physical Fitness
Workout Space (app
bay)
X N/A No No
Storage Space X 4 150 No No
Workshop X 1 49 No No
Training Room X N/A No No
SCBA Storage X N/A No No
SCBA Refill Station X N/A No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X 1 of 2 1,672 No No
Front Apparatus Apron X 2 1,100 Yes No
Rear Apparatus Apron /
Parking
X 0 No No
Comments/Recommendations
Overall facility Condition: POOR
Station is vastly undersized by modern fire service standards in many aspects including apparatus floor, living quarters, kitchen, and physical fitness space is in apparatus bay.
Station is very worn despite routine maintenance. Remove carpet throughout station and do polished concrete.
Reconfigure kitchen. Remove food cabinets and move water heater.
Dormitories and restrooms should be reconfigured as soon as possible for better gender inclusion and privacy.
Station can only accommodate daily 12-hour BLS ambulance due to lack of available dormitories.
Per GFD staff, a future construction project (late 2024 – early 2025 completion) is in the planning stage for reconfiguring existing space with 6 individual dorms and gender-neutral restrooms/showers. This will provide a more functioning facility for both male and female personnel and will also allow BLS 27 to be staffed at FS27 on a 24-hour basis. As it will remain in the station’s existing lot footprint, it will not provide an opportunity to correct other significant deficiencies.
Inadequate parking for personnel’s vehicles.
FACILITY ASSESSMENT
Fire Station 28
Address: 4410 New York Ave
Ownership: City of Glendale
Parcel Size (acres) .53
Building Size (sq. ft.) 5,500
Number of Stories 1
Building Age (years) 68
Daily Staffing Min. 4 Max. 4
Number of Apparatus Min. 2 Max. 2
Apparatus Bays Indoor: 2 Outdoor: 2
Assessment Factor Finding
Essential Services
Facility Yes No Unknown or N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X ADA restroom
Backup Electrical
Generator X Size: 31KW Fuel: Diesel
On-Site Vehicle Fueling X
Facility
Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust
Capture System X
PPE Allowed in
Living/Sleeping Areas X
Smoking and Tobacco
Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with
NFPA 1500
X
Carcinogen
Contamination Control
Zones
X
Ice machine in apparatus floor
PPE Storage
Conformance with
NFPA 1851
X
Open lockers on apparatus floor.
Dedicated PPE
Cleaning Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical
Waste Disposal X Sent to EMS Section
Dedicated EMS
Equipment/Supply
Storage
X
Secured Building
Access X
Secured Employee
Parking X
Annual Safety
Inspections X Last Inspection: Oct. 1, 2023
Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Poor Not in all rooms.
Roof Poor Dry rot, Termite. Numerous leaks
Asphalt Surfaces Poor
Standby Generator 2023 2019 Excellent Function tested monthly and serviced annually SCBA Air Compressor
(NONE)
N/A
PPE Extractor
(NONE)
N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 2 106 Yes No
Restroom(s) X 3 184 No No
Sleeping
(bedrooms/beds)
X 4 453 No No
Kitchen/Dining
(undersized)
X 1 162 No No
Living Area / Day
Room
X 1 220 Yes No
Physical Fitness
Workout Space
X 1 520 Yes Yes
Storage Space X 3 102 No No
Workshop X 1 78 No No
Training Room X N/A No No
SCBA Storage X N/A No No
SCBA Refill Station X N/A No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through
Apparatus Bays
X 1 of 2 1,504 No No
Front Apparatus Apron X 2 726 No No
Rear Apparatus Apron /
Parking
X 1 340 No No
Comments/Recommendations
Overall facility Condition: Poor
Station is vastly undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen.
Station is very worn. Water seeping through walls in front of station office, dorm, detached fitness room and through roof in numerous areas.
Physical fitness room in detached building to rear of station.
Additional extractor and washer/dryers are needed for PPE decontamination Remove carpet and replace with polished concrete where applicable.
Numerous roof leaks that have damaged remodeled dorm and bathroom areas.
Significant rot to eaves due to extremely degraded roofing.
Significant imbalance in HVAC system on dorm side of station.
FACILITY ASSESSMENT
Fire Station 29
Address: 2465 Honolulu Ave
Ownership: City of Glendale
Parcel Size (acres) .44
Building Size (sq. ft.) 11,500
Number of Stories 2
Building Age (years) 62
Daily Staffing Min. 10 Max. 10
Number of Apparatus Min. 5 Max. 5
Apparatus Bays Indoor: 3 Outdoor: 0
Assessment Factor Finding
Essential Services Facility Yes No Unknown or
N/A Comments
Meets ESA Seismic
Requirements X
Meets ADA Access
Requirements X ADA restroom
Backup Electrical Generator X Size: UNK Fuel: Diesel
On-Site Vehicle Fueling X
Facility Safety/Security
Fire Sprinkler System X
Smoke Detectors X
CO Detectors X
Vehicle Exhaust Capture
System X
PPE allowed in Living/Sleeping
Areas X
Smoking and Tobacco Free X
Apparatus Door Safety
Features X
Station Alerting System
Conformance with NFPA 1500 X
Carcinogen Contamination
Control Zones X
PPE Storage Conformance with
NFPA 1851 X Open lockers on apparatus floor.
Dedicated PPE Cleaning
Equipment X
Dedicated PPE
Decontamination Area X
Dedicated Medical Waste
Disposal X Sent to EMS Section
Dedicated EMS
Equipment/Supply Storage X
Secured Building Access X Poor security in front of building. Adjacent to Library Secured Employee Parking X
Annual Safety Inspections X Last Inspection: Oct. 1, 2023 Conducted quarterly
Major Facility
Systems/Components
Last
Serviced
or
Repaired
Last
Replaced Condition Notes
HVAC Poor Dampers
Roof Fair
Asphalt Surfaces N/A Concrete
Standby Generator 2023 UNK Fair Function tested monthly and serviced annually SCBA Air Compressor
(NONE)
N/A
PPE Extractor
(NONE)
N/A
Functional Areas Yes No Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Office/Workspace X 2 380 Yes No
Restroom(s) (Open floor plan) X 5 370 No No
Sleeping (bedrooms/beds) X 3/10 1,128 No No
Kitchen/Dining X 1 360 No No
Living Area / Day Room X 1 322 No No
Physical Fitness Workout
Space
X 1 410 No No
Storage Space X 3 115 No No
Workshop X 2 164 Yes No
Training Room X N/A No No
SCBA Storage X N/A No No
SCBA Refill Station X N/A No No
Emergency Vehicle
Parking/Storage YES NO Number Total Area
(Sq. Ft.)
Meets Current
Needs
Meets Anticipated
Future Needs
Drive-Through Apparatus Bays X 1 of 3 2,900 No No
Front Apparatus Apron X 2 N/A No No
Rear Apparatus Apron / Parking X 0 N/A No No
Comments/Recommendations
Overall facility Condition: Poor
Station is undersized by modern fire service standards in many aspects including apparatus floor, living quarters, and kitchen. Needs a major reconfiguration.
Station is very worn. Two fire poles. Poke through tiles throughout station.
Dormitories, lockers, and restrooms should be reconfigured for better gender inclusion and privacy. Bedding storage in a separate area.
Continual issues with leaking water and drain pipes throughout building.
Additional extractor and washer/dryers are needed for PPE decontamination Remove carpet and replace with polished concrete where applicable.
No security gates for parking
Marginal access into rear of station due to increased size of modern fire apparatus (Ladder Truck).
Roof leak in apparatus bay.
Large areas of paint on apparatus bay ceiling peeling off due to moisture.
This page was intentionally left blank
APPENDIX B
FIRE STATION PRIORITY LIST
This page was intentionally left blank
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
PRIORITY LIST
GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FACILITIES PRIORITIES
• This list is based off the 2023 Facilities Assessment created by Captain Joe Donnelly • This list does not address any pending seismic analysis as priorities • This list is based off the assumption that no facilities are being relocated and may change based on the Standards of Cover and in-depth Facilities Assessment that is forthcoming from an outside vendor
• The priority is to address immediate needs for gender neutrality and privacy • The short and long-term priorities lists should be evaluated prior to any commitment to a project to ensure they address strategic objectives for facilities planning PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FIRE STATION 27
• Move forward with the plans from IDS Group
• Add additional scope of work to include:
- Create (2) AO Dorms utilizing the shop area and current laundry area - New kitchen, to include removing water heater and utilizing space behind current food cabinets towards TV room to gain more space
- Replace windows with triple pane throughout for noise reduction and climate control • If this facility is not relocating, add gym area off TV room by pushing towards the street (discussed with IDS previously)
FIRE STATION 23
• Utilize f loor plan schematic from IDS to create (3) dorm rooms into existing footprint to allow for privacy
• Dorms should have individual lockers, add bedding locker to Captains dorm • Dorm room walls should be ¾ height like existing Station 27 • Replace flooring
• Replace windows with triple pane throughout for noise reduction and climate control PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FIRE STATION 24
• Utilize f loor plan schematic from Station 23 or 27 to create (3) dorm rooms into existing footprint to allow for privacy
• Dorms should have individual lockers
• Dorm room walls should be ¾ height like existing Station 27 • Replace flooring throughout
• ·Replace windows with triple pane throughout for noise reduction and climate control • Address any HVAC de ficiencies
• If this facility is not moving, it could go through a redesign similar to what IDS Group did for Station 27
PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FIRE STATION 28
• REPLACE ROOF
• Insulate and drywall ceiling in Captains dorm, Captains off ice, and TV Room • Address HVAC de ficiencies in above areas
• New windows for balance of Station that weren’t replaced during seismic retro fit/ renovation of dorms
• Replace flooring throughout
• Consider adding a metal building or similar to the dirt lot area for apparatus storage FIRE STATION 22
• Convert the two open dorms into four individual dorms • Provide individual lockers in each dorm
• Replace windows with triple pane throughout for noise reduction and climate control • New flooring in dorms
• Address HVAC in dorms for post conversion needs/requirements • Polish concrete on first floor hallways/off ice
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FIRE STATION 25
• Convert the two open dorms into four individual dorms • Provide individual lockers in each dorm
• Replace windows with triple pane for noise reduction and climate control • New flooring throughout
• Address HVAC in dorms for post conversion needs/requirements PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FIRE STATION 29
• If the current location is staying with no new construction - New roof
- Replace all windows
- Replace flooring throughout
• ·Gut the second-f loor bathroom, common locker room, dorms area, and move towards private dorms with individual lockers
• ·Convert bathroom area into at least three separate bathrooms (like Station 26 Captains bath)
• Address HVAC in dorms and entire station
• Consider utilizing the space above the apparatus bay for build out • If space above apparatus bay will be utilized, it may be advantageous to gut the entire building and redesign an interior plan for the f irst and second f loor that meets the needs of a today’s fire service
PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION PRIORITY LIST
FIRE STATION 21
• Complete redesign of kitchen
• Replace windows with triple pane throughout for noise reduction and climate control • Replace any flooring that hasn’t been addressed by Facilities • HVAC throughout the entire building (Ops/Admin/VFCC, gym) • ·Determine long term plan for additional buildout of the facility (above apparatus bay, etc.) • Address parking de ficiencies
FIRE STATION 26
• Refurnish Captains of fice (flooring is scheduled)
• Replace windows with triple pane for noise reduction
• New flooring in dorms
• Address HVAC in dorms for post conversion needs/requirements PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
APPENDIX C
SUPPORT SERVICES FACILITY
ASSESSMENTS
This page was intentionally left blank
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
21 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
W. HARVARD ST
OAK ST.
T29
E29
BLS21
EMS
SECTION
GFD PARKING
S. COLUMBUS AVE.
USAR21
E321
BC2
EMS
SECTION
W. HARVARD ST.
S. COLUMBUS AVE.
GFD PARKING
GFD PARKING
BC 2
BLS 21
ENGINE 21
TRUCK 21
USAR 21
ENGINE 321
OAK ST.
GLENDALE FIRE DEPARTMENT FIRE STATION 21
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
26 21
22 4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 .1 0 .2 0 .3 0 .4 0 .50.05
Miles
Fire Station 21
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 21
OVERVIEW
Address: 421 Oak St. (Between S. Columbus Ave. & S. Pacific Ave.) Ye ar Built: 1994
Story Height: 3 floors above ground, 1 floor below ground Apparatus Bays: 7 full length stalls with separate apparatus bay doors. Front and rear access for all of the stalls. Battalion 2 backs in from the front due to other light vehicles parked in the first stall.
Apparatus Assigned: Battalion 2, Truck 21, Engine 21, and BLS 21 are staffed full time. US&R 21 and Brush Engine 321 are cross staffed by the members of Truck 21. US&R 21 is dispatched throughout Area C by automatic aid agreements. US&R 21 also includes the US&R Tender which tows the UTV Gator. Brush Engine 321 is dispatched on all first alarm brush fires in Glendale. There is space for up to 3 Reserve Engines or 1 Reserve Engine plus 1 Tiller Truck Personnel Assigned : 12 total per shift. Battalion Chief, three Captains, two Engineers, four Firefighter Paramedics, and 2 Ambulance Operators
• Max employees that can be housed per 24 hr shift : 14 total Location : Fire Station 21 is one of 3 key fire stations in Glendale. It is located in the heart of the city in downtown Glendale. It is the largest facility in the department as it is the headquarters of the Glendale Fire Department. The district is a dense downtown metropolis which includes high rise, mid rise, major retail centers such as The Americana and Glendale Galleria, multifamily dwellings, and freeways Building: Fire Station 21 is an exposed masonry and steel structure with a metal standing seam pitched roof. The exterior is red brick. The interior includes dual glazed windows and hollow metal doors and frames.
Special Uses: The facility houses Fire Administration, the Verdugo Fire Communications Center, Small Engine Repair, and our Glendale Fire Museum. There is also a second building on the lot that is used by the EMS Section.
Security : The property is surrounded by a brick wall along the perimeter with 3 automatic rolling gates for access.
Community Space : There are several spaces for community interaction beyond the normal functions of a typical fire station. There is a foyer with a full time staffed front lobby. There is our Community Room which is a large classroom used for department training and community gatherings. The facility also has two other meeting areas including the Small Conference Room and the Verdugo Conference Room used by both sworn and civilian personnel.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system Backup Power: There is an on site diesel backup generator PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
APPARATUS BAY
Stalls: 7 Stalls plus an additional front access only stall for the GFD museum and antique f ire engine. Each stall has enough space for a Tiller Truck or two Fire Engines.
Access: There are separate bay doors in the front and rear with clear access at the rear of the station for all stalls. The only front line apparatus that backs in from the front is Battalion 2 due to parking in their stall for the Battalion 21 and Fire Chief 2.
Assessment
• Apparatus f loor needs to have the cracks f illed in, sealed, and painted • Walls need general repair and paint
• Additional ceiling lights need to be installed. Current lighting is poor in the app bay • Ceiling lights need to be changed out to LED
• Electric cord reels for apparatus charging need to be changed to higher amperage style • All ceiling mounted utilities need to be addressed. Various power and air lines are OOS • Floor drains should be installed
• New compressor rated at a higher capacity is needed to f ill apparatus tires • Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
TURNOUT ROOM
Area: 33’10” L x 19’8” W
Description: Open, individual metal
lockers used for storage of firefighting
turnouts and additional PPE for 36
personnel. EMS equipment is also stored
towards the rear of the turnout room.
Assessment
• Floor needs to have the cracks f illed in, sealed, and painted • Walls need general repair and paint
• Ventilation system needs to be improved to evacuate off gassing or moisture in turnouts • Additional lighting should be added for better visibility • Lockers do not appear to be large enough to hold the type of modern gear stored within • Doors that properly seal the storage area is needed to keep PPE from off gassing into the station living areas
• Main access door should lead direct into App Bay to reduce contamination into the living quarters
• EMS equipment should be stored in a different location or a wall needs to be constructed to separate medical equipment from f irefighting turnouts. Every effort should be exhausted to prevent exposure from off gassing turnouts.
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
SHOP
Area: 13’9” L x 13’4” W
Description: The workshop for Fire
Station 21 includes a mop sink, deep sink,
flammable liquids container, work bench,
cabinetry, and a rolling tool box . The
main access is from the Apparatus Bay.
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• Cabinets are fading and chipping and the countertop is chipped and delaminating, and should be replaced with a more durable material
• Ventilation should be improved to reduce moisture in the room • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop • 240V outlet should be installed for future use
PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
TANK FILL ROOM & COMPRESSOR ROOM
Tank Fill Area : 13’6” L x 10’11”
Description: Two separate rooms used to f ill and store SCBA and Oxygen bottles for department use. One room contains the SCBA compressor. The second room contains the f ill stations and storage shelves.
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• New cabinetry and countertops are needed to make more ef ficient use of the space • More SCBA and Oxygen bottle holders should be installed to increase storage capabilities • Ventilation should be improved to reduce moisture in the room • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
HOSE STORAGE ROOM
Area: 13’6” L x 9’7” W
Description: Storage space that contains shelving to hold spare f ire hose.
The space also stores miscellaneous f irefighting equipment, strike team deployment supplies, and a large ice maker
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• New cabinetry and countertops are needed to make more ef ficient use of the space • Ventilation should be improved to reduce moisture in the room • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop • Ice maker should be relocated to a space away from the Apparatus Bay to reduce contamination and in an area with better temperature control to increase the longevity of the machine
PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
RESTROOM (ADA)
Area: 8’4” L X 6’4” W
Description: Individual restroom accessed from the apparatus bay which includes a toilet, urinal, sink, and a storage shelf
Assessment
• The restroom needs an update with new tile, cabinetry, lighting, and a larger mirror • The restroom should use an update to the toilet, urinal, and sink as well • The ventilation needs to be improved to reduce moisture in the restroom • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the restroom PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
DECONTAMINATION ROOM (LAUNDRY ROOM)
Area: 15’1” x 10’8”
Description: The Decon Room includes a personnel decon shower, eye wash station, extractor for washing firefighting PPE, one residential washing machine, and one residential dryer. There is also shelving for storage of cleaning supplies.
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• New cabinetry and countertops are needed to make more ef ficient use of the space • Ventilation should be improved to reduce moisture in the room • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop • Install 2 new extractors and 2 turnout dryer so personnel can clean PPE in-house on a regular basis
• Install 2 nd washing machine to separate clothing from towels PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
MEZZANINE
Area: 61’4” L x 13’6” W
Description: 2 nd floor mezzanine along the north wall of the Apparatus Bay, above the Shop, Decon Room, Restroom, Tank Fill Room, and Compressor Room. The space is used for storage for Fire Station 21 pub ed supplies and miscellaneous station supplies/equipment.
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• New cabinetry and countertops are needed to make more ef ficient use of the space • Increased LED lighting so the space is more visible
• The large area needs to be assessed for long term use • The mezzanine needs to be sealed off to reduce contamination from the Apparatus Bay • The space can be converted into several individual dorms, bathrooms, and off ices for additional resources and/or EMS personnel.
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
OFFICE
Area:
26’4” L x 26’3” W total office space
Truck Captain Of fice: 10’6” x 8’6”
Engine Captain : 10’6” x 8’6”
Engineer: 9’8” x 8’6”
Main Off ice: 26’4 x 15’2”
Description: Off ice space with a
total of 6 computer work stations.
Individual off ices for the Truck Captain and Engine Captain.
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry is stain grade wood and has become worn and chipped and it should be replaced
• Windows need to be replaced with triple pane
• New window coverings are needed for better climate control and privacy • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair and paint
• New off ice chairs are needed to replace older worn chairs PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
DAY ROOM
Area: 33’3” L x 26’3” W
Description: The Day Room includes two
large dry erase boards, push pin board,
TV, and 10 chairs.
Assessment
• Carpet is worn and in need of replacement
• Areas with carpet should be replaced with polished concrete or luxury vinyl plank • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
• Lighting needs to be updated for the room
• Triple pane slider to block outside noise and new window coverings for better climate control and privacy
• Replace recliners
PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
KITCHEN & DINING AREA
Area: 43’9” L x 28’3” W
Description: Kitchen and dining area includes large refrigerator, stand alone freezer, stove/ oven/flat top, two microwaves, two sinks, prep island, and 52 individual food lockers Assessment
• General patch, repair, and painting of walls and ceiling is needed • Cabinetry is paint grade wood which is showing chipping, cracking, and breakage • Individual food lockers are showing wear and need to be updated • Ceiling lights need to be upgraded and under cabinet lighting needs to be added for increased visibility
• Long term plan should be developed for a complete remodel as the countertop space and dining area are not adequate for more than 12 full time personnel.
PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
KITCHEN PANTRY & PHONE BOOTH
Area:
Pantry: 7’8” L x 3’5” W
Phone Booth: 6’6” L x 3’ W
Description:
Extra storage space within the kitchen and dining
area for dry goods.
Assessment
• Carpet is worn and in need of replacement
• Flooring should be replaced with polished concrete or luxury vinyl plank • Cabinetry should be installed to maximize storage space • Additional lighting should be added for better visibility • Walls need general repair, and paint
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
UTILITY CLOSET
Area: 12’8” L x 11’8” W
Description: Downstairs storage area for cleaning supplies with a mop sink and f loor sink
Assessment
• Cabinetry is stain grade wood and has become worn, and it should be replaced • Floor needs to have the cracks f illed in then be resealed and polished • Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Area around both sinks should be checked for water damage and resealed • Ventilation should be improved to reduce moisture in the room PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
RESTROOM - 1 st FLOOR (ADA)
Area: 8’10” Lx 6’11” W
Description: Individual restroom (ADA) which includes a toilet, urinal, sink, and a storage shelf
Assessment
• The restroom needs an update with new tile, cabinetry and a larger mirror • The ventilation and lighting needs to be improved for the restroom to reduce moisture PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
DORMS
Area: Avg 12’02 L x 8’8” W
Description: 12 total individual dorms containing one twin long bed, mirror, side table, and lockers for 3 employees plus one visit locker Assessment
• Carpet is worn and needs to be replaced
• Windows need to be replaced with triple pane
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Locks need to be added to dorm doors to increase privacy PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
BATHROOM (Shared/Open)
Area: 29’6” L x 16’1” W
Description: This shared common
bathroom includes 4 sinks, 4 showers, 3
toilets, and 1 urinal
Assessment
• This bathroom does not allow for personal privacy or gender neutrality • When one employee uses this bathroom, he needs to lock the door to obtain toy98privacy • Option 1: The recommendation for this space is for it to be remodeled and split into four individual bathrooms, each with its own shower, sink, toilet, and changing area • Option 2: General remodel of the space is needed which includes the following:
• Replace the toilet partitions with full height partitions and doors for individual privacy when the restroom is used by more than one person
• The bathroom needs new tile, cabinetry, toilets, sinks, and a urinal • Walls need general repair, and paint
• The ventilation and lighting needs to be improved for the bathroom PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
BATHROOM (Women’s Bath)
Area: 15’3” L x 14’1” W
Description: Women’s bathroom
(Shared/Open) with two toilets, two
sinks, and two showers
Assessment
• This bathroom does not allow for personal privacy
• The recommendation for this space is for it to be remodeled and split into two individual bathrooms, each with its own shower, sink, toilet, and changing area • The bathroom is in need of general updating such as replacing tile, new cabinets, upgraded lighting, upgraded ventilation, a new sinks, and toilets • Walls need general repair, and paint
• The ventilation and lighting needs to be improved for the bathroom PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
BATHROOM (Captain’s)
Area: 14’ L x 13’11”
Description: Captain’s Bathroom (Shared/Open) with one toilets, one urinal, two sinks, and two showers
Assessment
• This bathroom does not allow for personal privacy
• The recommendation for this space is for it to be remodeled and split into two individual bathrooms, each with its own shower, sink, toilet, and changing area • The bathroom is in need of general updating such as replacing tile, new cabinets, upgraded lighting, upgraded ventilation, a new sinks, and toilets • Walls need general repair, and paint
• The ventilation and lighting needs to be improved for the bathroom PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
40 Hr Locker Room (Shared)
Area: 25’ L x 9’8” W
Description: 17 individual metal lockers
used by 40 hr employees to store extra
uniforms and toiletries in an open
changing area with 3 benches
Assessment
• This locker room does not allow for personal privacy
• Lockers are too small to store all of the uniforms a sworn employee would have. • The recommendation for this space is for it to be remodeled with larger individual lockers and private changing rooms
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair, and paint
• Carpet is worn and in need of replacement with luxury vinyl plank • The ventilation needs to be improved to reduce moisture PAGE 23 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
UPSTAIRS PHONE BOOTHS
Area:
West: 5’6” L x 4’5”
East: 5’6” L x 4’5”
Description: Small rooms not
currently being used
Assessment
• Carpet is worn and in need of replacement with luxury vinyl plank • Cabinetry needs to be updated to maximize storage potential and ef ficiency • Lighting needs to be added for better visibility
PAGE 24 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
GYM (3RD FLOOR)
Area: 35’ L x 25’3” W
Description:
Assessment
• Flooring needs to be replaced for a non-slip rubber style that provides more cushion and sound absorbing properties such as horse stall mats or similar style used in public gyms • Walls need general repair, and paint
• Windows need to be replaced with triple pane for better climate control • Ventilation should be improved to reduce moisture in the room • Individual HVAC controls or an HVAC split system needs to be installed PAGE 25 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
INTERIOR - GENERAL
Assessment
• All windows should be replaced with triple pane for better sound blocking and climate control eff iciency
• All carpet should be replaced
• Evaluate flooring options for high traff ic areas such as polished concrete or luxury vinyl plank
• Ventilation system need to be evaluated and have the duct work professionally cleaned • All stained and broken drop ceiling tiles need to be replaced • Mattresses should be replaced. They are past their life expectancy. • New paint throughout the station after repairing all damaged walls • Replace stain grade wood cabinetry with a more durable material PAGE 26 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
EXTERIOR - GENERAL
Assessment
• Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting
• Rear gates needs updated safety features including:
• Safety beam and safety impact device
• Additional 240v outlets need to be installed
PAGE 27 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
IMMEDIATE PRIORITIES
• Increase dorm privacy with locking doors and better window coverings • Replace windows, carpets, cabinetry, ceiling tiles, and paint at the same time • Address individual HVAC controls or convert to split systems in each dorm • Address the shared bathrooms upstairs
• There is enough square footage to turn the 3 shared bathroom into 8 individual complete bathrooms (shower, sink, toilet, changing area) • Replace mattresses and chairs
• Address worn carpet/ flooring and replace
• Triple pane windows with new window coverings for privacy, security, and more ef ficient cooling in the summer
PAGE 28 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
LONG TERM PRIORITIES
• Fire Station 21 is a prime candidate to remodel in the near future to help increase the number of working sworn and non-sworn personnel on a daily basis. • The community, population, call volume, and resources needed has out grown our headquarters
• Create a long term plan and timeframe on completely renovating the entire lot and interior of the station to turn it into a “100 year station” • This plan should include the ability to house 18 personnel to allow for growth • 18 personnel can be distributed in various ways: 3 heavy apparatus plus two ambulances or squads, and Battalion 2
• Station 25 can house a Tiller Truck inside its apparatus bay, if needed • 16 individual dorm rooms upstairs plus 8 individual bathrooms • Larger kitchen & dinning area with expansion into patio area • Utilize the space above the apparatus bay (currently vaulted ceilings) • Build a parking structure or dig below grade for subterranean parking • Update kitchen and dining area.
• Build out the kitchen and day room into the patio area for more square footage • Update appliances to meet city council priorities
• Update HVAC and include controls for each zone or room • Build a larger shop & small engine repair room to increase ability to maintain equipment within the department
• Longer app bays to increase the ability to house reserve and specialty apparatus along with other city vehicles
PAGE 29 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 21
SEISMIC ANALYSIS
PAGE 30 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 3 | Page
SECTION II: PROPERTY INSPECTION RESULTS
In this section, we provide a summary of information on the various buildings and their elements that have been inspected.
FIRE STATION #21 – 421 OAK ST
Built: 1 9 9 4
Area: 4 6 , 2 0 0
Stories: 3
Type: S1 - Brick / Masonry / Steel Frame
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Provide Tier 3 structural analysis to very seismic design criteria
2. Demo existing walls and ceilings to accommodate structural upgrades then reinstall to match
3. Provide clearance around existing sprinkler heads as required
4. Upgrade emergency and egress lighting
5. Anchor masonry veneer as required
6. Re-brace existing garage doors per structural requirements
7. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements
8. Add safety devices to light fixture lens covers
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Modify existing building moment frames to provide additional required stiffening
2. Full Tier 3 evaluation is required prior to remedial efforts to verify load requirements *
3. All non-structural components require lateral bracing and anchorage to building structure
*Note for Tier 3 review scope:
An ASCE 41 evaluation contains three different levels of evaluating existing structures. The first is a Tier 1 Screening. A Tier 1 screening relies on the completion of checklists of evaluation statements that identify potential deficiencies in a building based on performance of similar buildings in past earthquakes. A Tie r 2 Evaluation represents a more in-depth assessment of the existing structure, using an approach applicable to certain types of buildings and Performance Objectives based on specific evaluation of potential deficiencies to determine if they represent actual deficiencies that may require mitigation. Analysis of the response of the entire building may not be required. A Tier 3 Evaluation provides further depth to the assessment using an approa ch to evaluation in which complete analysis of the response of the building to seismic hazards is performed, implicitly or explicitly recognizing non-linear response. In many cases, the deficiency-based retrofit procedures of a Tier 1 or 2 evaluation represent a cost-effective improvement in seismic performance as it requires a less detailed evaluation or partial analysis. However, while a Tier 3 procedure represents a larger investment in design in terms of time and cost, the nature of the complete analysis may determine items shown not in compliance in a Tier 1 or 2 evaluation to be in compliance, thus reducing construction costs.
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $8,183,346
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
22 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
E. PALMER A VE.
S. GLENDALE AVE.
S. GLENDALE AVE.
E. PALMER A VE.
FIRE SHOP
FIRE STATION 22
FIRE STATION 22
FIRE SHOP
ALLEY
ALLEY
GFD PARKING
BLS 22E 22
GLENDALE FIRE DEPARTMENT FIRE STATION 22
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
25 21
22 5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 . 1 0 . 2 0 . 3 0 . 4 0 . 50.05
Miles
Fire Station 22
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 22
OVERVIEW
Address: 1201 S. Glendale Ave. (Between E. Palmer Ave. & E. Cypress St.) Ye ar Built: 1990
Story Height: 2 floors above ground
Apparatus Bays: 2 stalls with separate apparatus bay doors. Front and rear access for both stalls Apparatus Assigned: Engine 22 and BLS 22 with space in the app bay for one Reserve Engine Personnel Assigned : Captain, Engineer, two Firefighter Paramedics, and two Ambulance Operators • Max employees that can be housed per 24 hr shift : 6 total Location : Fire Station 22 is Glendale’s most southern station. It is located on the corner of S. Glendale Ave.and E. Palmer Ave. The fire station is closest to the Glendale/Los Angeles border, which includes automatic aid in some areas. The district around the station has a dense population with many multi- family dwellings and numerous skilled nursing facilities. The Glendale Memorial Emergency Room is located in 22’s district
Building: Fire Station 22 is an exposed masonry and steel structure with a sloping metal standing seam roof. Overall construction includes dual glazed exterior windows, hollow metal doors & frames, and an exposed red brick exterior.
Special Uses: This fire station shares the lot with the Fire Mechanical Maintenance Facility and old Fire Warehouse, located on the western side of the property. The Fire Mechanical Maintenance is managed by the Glendale Department of Public Works.
Security : The property is surrounded by a brick wall along the perimeter with 3 automatic rolling gates for access.
Community Space : There are no additional spaces for community interaction beyond the normal functions of a typical fire station. There is a dedicated unsecured front lobby for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system.
Backup Power: There is an on site diesel backup generator.
PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - APPARATUS BAY
Area: 69’6” L x 34’9” W
Stalls: 2 full length bays (with the ability to house a Tiller Truck) Access: Separate apparatus bay doors in both the front and rear of the fire station with clear access in the rear for both stalls
Assessment
• Apparatus f loor needs to have the cracks f illed in, sealed, and painted • Ceiling lights need to be changed out to LED
• Second gas heater needs to be hooked up to the gas line. Currently it’s non-operational • Electric cord reels for apparatus charging need to be changed to higher amperage style • Ceiling paint and drywall showing signs of water damage • Watch desk cabinets need to be replaced, cabinets are fading and the counter top is chipped and delaminating
• Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
ENGINE 22
BLS 22
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - TURNOUT LOCKER ROOM
Area: 12’3” L x 9’ W
Description:
15 open lockers plus 9
cubbies used for
storage of f irefighting
turnouts and
additional PPE
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted • Ventilation system needs to be installed to evacuate off gassing or moist turnouts • Turnout locker should have individual HVAC control isolated to that room • Cabinetry is stain grade wood and is fading and chipping and it should be replaced with a more durable material
• Lockers do not appear to be large enough to hold the type of modern gear stored within • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Additional lighting should be added for better visibility • Back wall need general repair and paint
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - SHOP
Area: 10’10” L x 16’10” W
Description: The workshop for Fire Station 22
includes 2 washing machines, 2 dryers, mop sink,
and a f lammable liquids container. The main access
is from the Apparatus Bay. The shop also has a door
that leads outside to a parking area.
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted or polished • Windows need to be replaced with triple pane
• Walls need general repair and paint
• Drywall behind the washing machine needs to be patched • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Cabinetry is stain grade wood with plastic laminate countertops • Cabinets are fading and chipping and the countertop is chipped and delaminating, and should be replaced with a more durable material
• Ventilation should be improved to reduce moisture in the room • 240V outlet should be installed for future use
PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - SEWING ROOM
Area: 11’5” L x 20’8” W
Description: The main access is from the Apparatus Bay. The sewing room also has a door that leads outside towards the southern parking area.
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted • Windows need to be replaced with triple pane
• Walls need general repair and paint
• Door leading into the room is damaged and cracked
• Cabinetry is stain grade wood with plastic laminate countertops • Cabinets are fading and chipping and the countertop is chipped and delaminating, and should be replaced with a more durable material
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • 240V outlet should be installed for future use
• Can add turnout/PPE lockers in the sewing room to increase the size of the individual lockers in the Turnout Locker Room. AOs can store their PPE in these lockers to free up space in the Turnout Room across the apparatus bay
PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - PUBLIC LOBBY / FOYER
Area: 11’10” L x 8’7” W
Description: This is the public entrance off of S. Glendale Ave. with a counter top for public interaction.
Assessment
• Front door is equipped with push/pull panic hardware and no lock which creates a security vulnerability
• Inner foyer door needs to have a deadbolt lock to provide for station security and controlled access
• Front entrance needs shades or blinds for privacy and increased security • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • A roll up door similar to FS21’s lobby should be installed at the public countertop to fully secure Fire Station 22
PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - OFFICE
Area: 12’8” L x 26’ W
Description: The off ice contains 3 computer work stations with access to the public lobby via countertop
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry is stain grade wood and has become worn and chipped and it should be replaced
• Windows need to be replaced with triple pane
• The station is located on Glendale Blvd, which is a major thoroughfare in Glendale • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • New window coverings are needed for better climate control and privacy • The off ice is large enough to possibly split into an off ice with a separate small conference room, divided by a glass wall.
PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - CAPTAIN’S DORM & BATHROOM
Area (Dorm): 17’5” L x 14’8” W
Area (Bathroom): 5’11” L x 12’6” W
Description: Individual dorm and bathroom, includes sink, toilet, and shower.
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The Captain’s Dorm faces Glendale Blvd, which is a major thoroughfare in Glendale • Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • The bathroom is in need of general updating such as replacing tile, new cabinets, upgraded lighting, upgraded ventilation, a new sink, and a new toilet PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - EMS SUPPLY CLOSET
Area: 5’10” L x 14’10” W
Description: Storage area solely for EMS restock equipment Assessment
• Cabinetry is stain grade wood and has become worn, and it should be replaced • Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored 1st FLOOR - PHONE BOOTH
Area: 4’6” L x 2’9” W
Description: Phone removed several years ago. This space is not currently being used.
Assessment
• Carpet is worn and in need of replacement
• Flooring should be replaced with polished concrete or luxury vinyl plank • Cabinetry should be installed to maximize storage space • Additional lighting should be added for better visibility • Walls need general repair, and paint
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - DAY ROOM
Area: 24’7” L x 15’11” W
Description: The Day Room includes a large dry erase board, TV, and 6 chairs.
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas should be replaced with polished concrete or luxury vinyl plank • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - RESTROOM (ADA)
Area: 7’1” L x 9’7” W
Description: Downstairs individual restroom (ADA) with a toilet, urinal, and sink.
Assessment
• Replace the toilet partition with full height partition and door for individual privacy when the restroom is used by more than one person
• The restroom needs an update with new tile, cabinetry and a larger mirror • The ventilation and lighting needs to be improved for the restroom to reduce moisture PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - UTILITY CLOSET
Area: 8’9” L x 4’9” W
Description: Downstairs storage area with a mop
sink
Assessment
• Floor needs to have the cracks f illed in, resealed, and painted • Cabinetry is stain grade wood and has become worn, and it should be replaced • Drop ceiling tiles should be replaced as the current ones are damaged and discolored PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
1st FLOOR - KITCHEN & DINING AREA
Area: 29’6" L x 14’ W
Description: Kitchen and dining area includes one refrigerator/freezer, stove/oven, one microwave, one sink, and 24 food lockers
Assessment
• General patch, repair, and painting of walls and ceiling is needed • Cabinetry is paint grade wood which is showing chipping, cracking, and breakage • Individual food lockers are showing wear and need to be updated • Sliding door and sliding screen door need to be replaced • Long term plan should be developed for a complete remodel as the countertop space and dining area are not adequate for 6 full time personnel.
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - LIBRARY
Area: 10’ L x 15’1” W
Description: This room was used as a library when the f ire station was constructed and housed 4 personnel per shift. The library is now being used to provide a temporary gender neutral individual dorm.
Assessment
• The library is currently being used as a temporary individual dorm area since the two original dorm rooms do not provide for personal privacy or gender neutrality • Option 1: This space would be best utilized as a second upstairs individual complete bathroom with its own shower, sink, toilet, and changing area. This would provide an upstairs bathroom to allow for gender neutral use. The current upstairs bathroom is a shared bathroom facility for 4 employees (2 Firef ighter Paramedics and 2 Ambulance Operators)
• Option 2: If not converted into a single use bathroom, the library needs to be converted into a proper dorm room including an entry door without a window and cabinetry designed specif ically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage
PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
General room assessment for the library:
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Windows need to be replaced with triple pane
• The dorm faces Glendale Blvd, which is a major thoroughfare in Glendale with heavy traffic noise
• Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - NORTH DORM
Area: 12’8” L x 17’7” W
Description: This open
dorm contains two
beds separated by a
small partition and
includes cabinetry for 6
employees
Assessment
• This is a shared dorm space for 2 employees
• The dorm does not allow for personal privacy such as changing clothes or sleeping • This space is large enough to split into two separate individual dorm rooms • Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The dorm faces Glendale Blvd, which is a major thoroughfare in Glendale with heavy traffic noise
• Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair, and paint
PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - SOUTH DORM
Area: 12’8” L x 17’5”
Description: This open dorm contains two beds separated by a small partition and includes cabinetry for 6 employees
Assessment
• This is a shared dorm space for 2 employees
• The dorm does not allow for personal privacy such as changing clothes or sleeping • This space is large enough to split into two separate individual dorm rooms • Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The dorm faces Glendale Blvd, which is a major thoroughfare in Glendale with heavy traffic noise
• Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - UPSTAIRS COMMON BATHROOM
Area: 15’10” L x 15’4” W
Description: This shared common bathroom includes 2 sinks, 2 showers, 2 toilets, and 1 urinal
Assessment
• This bathroom does not allow for personal privacy or gender neutrality • When a single employee uses this bathroom, he or she needs to lock the door to obtain privacy
• Option 1: The recommendation for this space is for it to be remodeled and split into two individual bathrooms, each with its own shower, sink, toilet, and changing area • If the library and utility closet is converted into an individual bathroom as well, this would allow for 3 individual bathrooms upstairs
• Option 2: General remodel of the space is needed which includes the following:
• Replace the toilet partitions with full height partitions and doors for individual privacy when the restroom is used by more than one person
• The bathroom needs new tile, cabinetry, toilets, sinks, and a urinal • Walls need general repair, and paint
• The ventilation and lighting needs to be improved for the bathroom PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - ENGINEER’S DORM & BATHROOM
Area (Dorm): 11’3” L x 15’10” W
Description: Individual dorm and bathroom, includes sink, toilet, and shower, assigned to the E22 Engineer
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced
with polished concrete or luxury vinyl plank
• Cabinetry is stain grade wood and has become
worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version
designed specif ically for the needs of 48 hour
personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The dorm faces Glendale Blvd, which is a major thoroughfare in Glendale with heavy traffic noise
• Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair, and paint
• The bathroom is in need of general updating such as replacing tile, cabinets, upgraded lighting, upgraded ventilation, a new sink, and a new toilet PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - UTILITY CLOSET
Area: 4’1” L x 15’9” W
Description: Upstairs storage area with a mop sink
Assessment
• Floor needs to have the cracks f illed in, resealed and painted • There is an open FSR on the mop sink due to a leak
• Cabinetry needs to be updated to maximize storage potential and ef ficiency • Ventilation should be improved to reduce moisture in the room 2nd FLOOR - STORAGE CLOSET
Area: 9’ L x 7’ W
Description: Upstairs storage area
Assessment
• Floor needs to have the cracks f illed in then resealed and painted • Walls need general repair, and paint
• The ventilation and lighting needs to be improved for the closet PAGE 23 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
2nd FLOOR - GYM
Area: 28’7” L x 15’4” W
Description: Indoor gym area for daily, mandatory physical training Assessment
• Flooring needs to be replaced for a non-slip rubber style that provides more cushion and sound absorbing properties such as horse stall mats or similar style used in public gyms • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair and paint
• Windows need to be replaced with triple pane for better climate control • Ventilation should be improved to reduce moisture in the room • Individual HVAC controls or an HVAC split system needs to be installed PAGE 24 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
INTERIOR - GENERAL
Assessment
• All windows should be replaced with triple pane for better sound blocking and climate control eff iciency
• All carpet should be replaced
• Evaluate flooring options for high traff ic areas such as polished concrete or luxury vinyl plank
• Ventilation system need to be evaluated and have the duct work professionally cleaned • All stained and broken ceiling tiles need to be replaced • Mattresses should be replaced. They are past their life expectancy. • New paint throughout the station after repairing all damaged walls PAGE 25 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
EXTERIOR - GENERAL
Assessment
• Landscape is overgrown
• Patio cover is showing signs of rot
• Additional station security is needed, such as cameras around property, parking area, and front entrance, along with better exterior lighting
PAGE 26 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
IMMEDIATE PRIORITIES
• Address the shared common dormitories upstairs
• There is enough square footage to convert the 2 open dorms into 4 individual dorms • Replace windows, carpets, cabinetry, ceiling tiles, and paint at the same time • Address individual HVAC controls or convert to split systems in each dorm • Address the shared bathroom upstairs
• There is enough square footage to convert the shared bathroom, utility closet, & library into 3 individual complete bathrooms (shower, sink, toilet, changing area) • Replace mattresses
• Address worn carpet/ flooring and replace
• Install triple pane windows with new window coverings for privacy, security, noise reduction and more ef ficient climate control
LONG TERM PRIORITIES
• Fire Station 22 is a prime candidate to completely remodel the interior to withstand future changes and increases in personnel or service levels to the community. • Fire Station 22 was constructed in the 1980s to initially house 4 personnel working on 1 apparatus. The community, population, call volume, and resource needs have outgrown this station.
• Create a long term plan and timeframe on completely renovating the interior of the station to turn it into a “100 year station”
• This plan should include the ability to house 10 personnel to allow for future growth • 10 personnel can be distributed in various ways: 2 heavy apparatus plus an ambulance or 1 heavy apparatus plus two ambulances, or an ambulance & squad • Station 22 can house a Tiller Truck inside its apparatus bay, if needed • 10 individual dorm rooms upstairs plus 4 individual bathrooms • Larger gym area
• Larger kitchen & dinning area with expansion into unused grass and patio area • Utilize the space above the apparatus bay (currently vaulted ceilings) PAGE 27 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
• Update kitchen and dining area
• Build out the kitchen into the patio area for more square footage • Update appliances to meet city council priorities
• Update HVAC and include controls for each zone or room • Install vehicle lift to increase available parking in the rear of the station PAGE 28 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 22
SEISMIC ANALYSIS
PAGE 29 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 4 | Page
FIRE STATION #22 – 1201 S. GLENDALE AVE.
Built: 1 9 8 8
Area: 2 , 8 0 0
Stories: 2
Type: RM1 & 2 - Brick / Masonry / Steel Frame / Spread Footings
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Provide new brick façade around new moment frames columns at front bays to match existing
2. Relocated existing utilities, mechanical and lighting to accommodate new work at bay opening
3. Remove and replace interior soffit and replace to accommodate new beam
4. Remove and replace ceilings for new beam strengthening at line B
5. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Masonry walls at front and rear apparatus bays require strengthening with addition of new steel moment frame and upgraded grade beam
2. All non-structural components require lateral bracing and anchorage to building structure
3. Re-bracing existing garage doors to correct story drift ratio
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $1,313,057
This page was intentionally left blank
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
23 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
LIBRARY
E. CHEVY CHASE DR.
E. CHEVY CHASE DR.
LIBRARY
FS23
FS23
GFD PARKING
GLENDALE FIRE DEPARTMENT FIRE STATION 23
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
23 5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 .1 0 .2 0 .3 0 .4 0 .50.05
Miles
Fire Station 23
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 23
OVERVIEW
Address: 3303 E. Chevy Chase Dr. (Between Emerald Isle Dr. & Sussex Ct.) Ye ar Built: 1972
Story Height: 1 Floor above ground
Apparatus Bays: 1 stall with parking for 1 fire engine. The rear access is limited. The turn is too tight for current fire engines to drive into the station from the rear. The engine backs into the fire station from the front.
Apparatus Assigned: Engine 23 (No additional space for Reserve Apparatus or Ambulance) Personnel Assigned : Captain, Engineer, and two Firefighter Paramedics • Max employees that can be housed per 24 hr shift : 4 total Location : Fire Station 23 is a single paramedic engine station located in the Chevy Chase Canyon area of east Glendale. The station is located in a hilly residential area with Chevy Chase Dr as the main 2 lane road in and out of the canyon.
Building: Fire Station 23 is a combination masonry and wood framed structure with a pitched roof finished with concrete shingle tiles.
Special Uses: This fire station shares the lot with an attached Glendale public library Security : The property is not secured with either an access gate or wall/fence surrounding the property. The rear parking area can be accessed by the public through the open driveway.
Community Space : There is no additional spaces for community interaction beyond the normal functions of a typical fire station. There is no dedicated front lobby or foyer for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system Backup Power: There is an on site diesel backup generator PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
APPARATUS BAY
Area: 43’7” L x 20’9” W (4’3” long
walkway to living space doors)
Stalls: 1 full length bay (single engine)
Access: Front and rear apparatus bay
doors, but access is limited in the rear
due to turning radius. E23 backs into the
apparatus bay from the front.
Assessment
• Apparatus f loor needs to have the cracks f illed, sealed, and painted • Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Walls need general repair and paint
• Additional ceiling lights need to be installed. Current lighting is poor in the app bay • Electric cord reels for apparatus charging need to be changed to higher amperage • There are many exposed conduits that have been installed throughout the years and should be addressed properly
• Watch desk cabinets are fading and worn. They should be replaced with a new, more durable material
• There is a mop sink alcove with damaged tile that needs to be repaired • Ice maker is installed next to the apparatus and should be relocated away from an area exposed to diesel engine exhaust.
• Floor drains should be installed
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
TURNOUT CLOSET & LOCKERS
Description: A combination of 6 open lockers and 2 small closets in the apparatus bay used for storage of firefighting turnouts and additional PPE for 12 personnel. There is a single hook and 2 shelves for each employee’s gear in the closets.
Assessment
Closet
• Void space above lockers should be assessed to increase height and total square footage • Floor needs to have the cracks f illed in, sealed, and painted • Shelves and hooks need to be replaced with individual storage lockers • Doors that properly seal the storage area are needed to keep PPE from being exposed to diesel exhaust fumes
• Ventilation system needs to be installed to evacuate off gassing or moisture in turnouts Lockers
• Lockers are new and in good condition
• Doors should be installed that properly seal the lockers to keep diesel exhaust from being exposed to the PPE
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
PHONE BOOTH
Description: Not currently being used
Assessment
• Carpet is worn out and should be replaced with polished concrete or luxury vinyl plank • Cabinetry should be installed to maximize storage space • Walls need general repair and paint
• Additional lighting is need inside of the room
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the storage area
EMS SUPPLY CLOSET
Area: 4’ L x 1’5” W
Description: Storage area for EMS restock
equipment
Assessment
• Shelves need to be upgraded to make a more ef ficient storage area • Additional lighting is need inside of the closet
• Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall. This includes the hallway that leads up to the EMS Supply Closet.
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the hallway • Closet should also contain locks, especially with its location in near the public entrance.
PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
OFFICE
Area: 15’11” L x 9’10” W
Description: The off ice contains 2
computer work stations with an
exterior door that leads out to the
front of the f ire station. There is no
separate lobby for public
interaction.
Assessment
• Carpet is worn out and flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall • Electrical is def icient to support modern needs
• Front entrance is all glass and should be replaced with triple pane windows and a door with improved seals
• New window coverings are needed for better climate control and privacy PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
CAPTAIN’S DORM
Area: 15’10” L x 10’4”
Description: Individual dorm with
three individual lockers and one
chair
Assessment
• Carpet is worn and in need of replacement
• Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall • Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Window needs to be replaced with a triple pane window and a new window covering • Individual HVAC controls or a split system needs to be installed PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
BATHROOM
Area: 15’4” L x 7’3” W
Area (shower): 3’ L x 7’3” W
Area (sinks): 6’5” L x 7’3” W
Area (toilet/urinal): 4’9” L x 7’3” W
Description: Open shared
bathroom with one toilet, one
urinal, two sinks, and one shower
Assessment
• Bathroom is in need of a remodel to conform to current standards of gender equality and personal privacy
• This space can be converted into two separate individual fully contained bathrooms, each with a sink, toilet, shower, and changing area
• ADA requirements may require additional space
• Short term improvements needed:
• Replace urinal with a toilet and install full height partitions for personal privacy • Upgrade ventilation to reduce moisture in both the shower and sink areas • Update tile, sinks, mirror, and lighting
• Walls need general repair and paint
PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
LOCKER ROOM
Area: 16’ L x 5’1” W
Description: Shared locker area
with 12 individual lockers. The
locker room also includes a
stacked washing machine/dryer.
Assessment
• Carpet is worn out. Flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the locker room PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
FIREFIGHTER DORM
Area: 18’ L x 17’7” W
Description: Open shared dorm area for
3 employees. Dorms are separated by 7
foot tall partitions that do not go all the
way up to the ceiling. Curtains cover the
entrance of each dorm from the front.
There are no doors to each dorm. There
is also an elliptical and TV in the dorm.
Assessment
• This is an open shared dorm space for 2 employees
• The dorm does not allow for personal privacy or gender neutrality with half height partitions and curtains instead of locking doors
• This space is large enough to split into three separate individual dorm rooms • Carpet is worn and needs to be replaced
• Windows need to be replaced with triple pane windows
• Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the dorm room • HVAC split system with individual controls OR individual controls for every dorm if one HVAC system
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
SHOP
Area: 10’3” L x 7’3” W
Description: The work shop
includes a work bench, rolling tool
box, air compressor, shelves, and
2 nd station refrigerator.
Assessment
• New compressor rated at a higher capacity is needed to f ill apparatus tires • Floor needs to have the cracks f illed in, resealed, and painted • New work bench and cabinetry is needed, the current wood is worn, faded, and chipped • Walls need general repair and repaint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall • Additional lighting is needed inside of the shop
• A proper ventilation system should be installed
• 240V outlet should be installed for future use
PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
ENGINEER’S DORM
Area : 11’2” L x 10’4” W
Description: Individual dorm with no
individual lockers. The dorm includes a
table, chair, and TV.
Assessment
• Engineer’s dorm can be moved to the Firef ighter’s dorm area during a major remodel. This would allow for increased space to the kitchen, shop, and day room. • If there is no major remodel:
• Carpet is worn and in need of replacement
• Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall • Window needs to be replaced with triple pane window and a new window covering • Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be installed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage
• Individual HVAC controls or a split system needs to be installed PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
KITCHEN & DINING AREA
Area: 21’1" L x 10’ W
Description: Kitchen with dining table, 4 chairs, stove/oven, one refrigerator, one microwave and 12 personal lockers
Assessment
• Kitchen is in need of a full remodel
• Cabinetry is paint grade wood which is showing chipping, cracking, and breakage at the edges and drawer/door fronts
• Walls and ceiling need general repair and paint
• Storage space needs to be increased and made more eff icient. • There is very little counter space for food prep and not enough space to store small appliances and kitchenware
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the kitchen PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
DAY ROOM
Area: 24’7” L x 15’11” W
Description: The Day Room
includes a dry erase board, TV, and
4 chairs.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Sliding door and windows needs to be replaced with triple pane and a new window coverings
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
GYM
Area: 28’7” L x 15’4” W
Description: Physical training area from the rear of the station. Originally part of the library.
Assessment
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Walls need general repair and paint
• Sliding door and windows need to be replaced with triple pane and a new window coverings for better climate control
• Ventilation should be improved to reduce moisture in the room • Individual HVAC controls or an HVAC split system needs to be installed PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
INTERIOR - GENERAL
Assessment
• All windows should be replaced with triple pane windows • All flooring should be replaced
• High traff ic areas need to be evaluated for polished concrete or luxury vinyl plank options • HVAC system need to be evaluated and have ducts professionally cleaned • Glued on ceiling tiles need to be scraped off, and replaced with painted drywall • Mattresses should be replaced, they are past their life expectancy. • Walls need general repair and paint
EXTERIOR - GENERAL
Assessment
• There are no security measures at FS23
• Rear parking area, shed, and gym is completely open to the public • Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting
• Landscaping is over grown and needs to be trimmed around the property PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
IMMEDIATE PRIORITIES
• Address the shared dormitories
• There is enough square footage to turn the 2 open dorms into 3 individual dorms • Build out 3 individual dorms with full height walls, locking doors, 3 HVAC split systems, and lockers
• Replace windows, carpet, cabinetry, ceiling tiles, and paint at the same time • Address the shared bathroom
• There is enough square footage to turn the shared bathroom into 2 individual complete restrooms (shower, sink, toilet, changing area)
• Replace mattresses
• Address carpet/ flooring throughout the station
• Triple pane windows with new window coverings for privacy, security, and more ef ficient cooling in the summer
PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
LONG TERM PRIORITIES
• Fire Station 23 is a prime candidate to completely remodel the interior to withstand future changes and increases in personnel or service to community. • Fire Station 23 was constructed in the 1970s to initially house 4 personnel working on 1 apparatus. The community, population, call volume, and resources needed in Glendale has out grown this station.
• Create a long term plan and timeframe on completely renovating the interior of the station to turn it into a “100 year station”
• This plan should include the ability to house 6 personnel to allow for growth • This would allow space for an additional resource in the future • 6 individual dorm rooms plus 3 individual bathrooms
• Larger gym area
• Larger kitchen & dinning area
• Update kitchen and dining area.
• Update appliances
• Update HVAC and include controls for each zone or room • If the opportunity to take over the library arises, the fire department needs to make a remodel at Fire Station 23 a high priority. This would allow the fire department to expand its capabilities.
PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 23
FINISH PLAN (FY 22/23)
PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
WH
FD
FD
DORM
#2
108
DORM
#1
110
DORM
#3
109
TOILET
#1
107
TOILET
#2
106
CAPTAIN
ROOM
103
CAPTAINS
OFFICE
101
W/D
105
MECH.
ROOM
111
CORRIDOR
102
LOCKER
AREA
104B
(E)
APPARATUS
112
(E)
ELEC.
&
SIGNAL
EQUIP.
113
(E)
TURN
OUT
CLOTHING
114
(E)
HOSE
STOR.
RACKS
115
FINISH PLAN
A-3GLENDALE FIRE STATION #23 & LIBRARY
1/4" = 1'-0"
GLENDALE FIRE DEPARTMENT FIRE STATION 23
SEISMIC ANALYSIS
PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 5 | Page
FIRE STATION #23 – 3303 E. CHEVY CHASE DR.
Built: 1 9 7 2
Area: 5 , 0 0 0
Stories: 1
Type: RM1 - Brick / Masonry / Wood Framing
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Remove and replace existing roofing to accommodate new anchoring at roof and wall diaphragm
2. Remove and replace drywall at corners to accommodate new strapping
3. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements
4. Add safety devices to light fixture lens covers
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Install additional wall anchors at roof and hold downs at base to resist out-of-plane forces
2. Install new blocking and straps at building reentrant corners
3. All non-structural components require lateral bracing and anchorage to building structure
4. Re-bracing existing garage doors to correct for story drift ratio
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $706,618
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
24 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
CAÑADA BLVD.
ENGINE 24
HAZ MAT 24
CAÑADA BLVD.
GLENDALE FIRE DEPARTMENT FIRE STATION 24
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
24 25
5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 .15 0 .3 0 .45 0 .6 0 .750.07
Miles
Fire Station 24
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 24
OVERVIEW
Address: 1734 Cañada Blvd. (Between Colina Dr. & Towne St.) Ye ar Built: 1964
Story Height: 1 Floor above ground
Apparatus Bays: 2 stalls with single apparatus bay doors. Front and rear access for both stalls Apparatus Assigned: Engine 24 and HM 24 with no space for Reserve Apparatus Personnel Assigned : Captain, Engineer, and two Firefighter Paramedics Location : Fire Station 24 is our Hazardous Materials station. Personnel assigned at station 24 cross staff the Fire Engine and the Type 1 Haz Mat unit. First in district includes wildland urban interface, multiple freeways, Glendale Community College, and the Civic Auditorium.
Building: Fire Station 24 is a wood framed structure with a pitched asphalt shingle roof. The exterior is finished with a combination stucco and brick veneer. The exterior windows are single glazed aluminum framed windows. The exterior doors are hollow metal doors and frames. The interior doors are hollow wood doors with metal frames.
Special Uses: This fire station houses Haz Mat 24. It is an OES Type 1 hazardous response unit for Area C with automatic aid in parts of LA County. There is a storage shed on site to help house some of the Type 1 equipment.
Security : The property is not secured by any access gate or wall/fence that surrounds the property.
The rear of the station where personnel park personal vehicles and the gym area are open to the public.
Community Space : There are no additional spaces for community interaction beyond the normal functions of a typical fire station. There is a small unsecured foyer near the front door for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system Backup Power: There is an on site diesel backup generator PAGE 1 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
APPARATUS BAY
Area: 41’1” L x 28’11” W
Stalls: 2 full length bays (one heavy apparatus in each stall, except a tiller truck) Access: Single apparatus bay doors in both the front and rear of the f ire station for both stalls
Assessment
• Apparatus f loor needs to have the cracks f illed in, sealed, and painted • Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Walls need general repair and paint
• Electric cord reels for apparatus charging need to be changed to higher amperage • Floor drains should be installed
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
TURNOUT LOCKER
Description: 2 small closets used for storage of f irefighting turnouts and additional PPE for 12 personnel. There is a single hook for each employee’s gear.
Assessment
• Locker space is inadequate and can be increased if utility closet and hallway leading to the locker room (middle door) are converted into additional locker space • Void space above lockers should be assessed to increase height and total square footage • Floor needs to have the cracks f illed in, sealed, and painted • Shelves and hooks need to be replaced with individual storage lockers • Doors that properly seal the storage area are needed to keep PPE from being exposed to diesel exhaust fumes
• Ventilation system needs to be installed to evacuate off gassing or moisture in turnouts
UTILITY CLOSET
Description: Closet is used for storage of towels, apparatus cleaning supplies, and a flammable liquids container.
Assessment
• Floor needs to have the cracks f illed in, sealed, and painted • Cabinetry should be installed to maximize storage space • Walls need general repair and paint
• Additional lighting is needed inside of the closet
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the storage area PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
SHOP
Area: 8’6” L x 5’10” W
Description: The workshop includes a work bench, rolling tool box, air compressor, and shelves.
Assessment
• New compressor rated at a higher capacity is needed to f ill apparatus tires • Floor needs to have the cracks f illed in, resealed, and painted • New workbench and cabinetry is needed, the current wood is worn, faded, and chipped • Walls need general repair and repaint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Additional lighting is needed inside of the shop
• A proper ventilation system should be installed
• 240V outlet should be installed for future use
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the kitchen PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
LAUNDRY ROOM
Area: 13’3” L x 9’4” W
Description: The Laundry Room
includes one washer and dryer,
refrigerator, and cabinets used for
Haz Mat Type 1 storage.
Assessment
• Fire Station 24 needs a second washing machine for gross decontamination reduction • Floor needs to have the cracks f illed in then resealed and painted • Walls need general repair and paint
• Ceiling tiles need to be replaced with drywall and whole apparatus bay needs to be repainted
• Windows need to be replaced with a triple pane windows • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the laundry area PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
KITCHEN & DINING AREA
Area: 15‘6 L x 12’10’ W (+3’ of locker
depth)
Description: Kitchen with dining
table, 4 chairs, stove/oven, one
refrigerator, one microwave and 12
personal lockers.
Assessment
• Kitchen is in need of a full remodel
• Cabinetry is paint grade wood which is showing chipping, cracking, and breakage at the edges and drawer/door fronts
• Walls and ceiling need general repair, and paint
• Storage space needs to be increased and made more eff icient. • There is very little counter space for food prep and not enough space to store small appliances and kitchenware
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the kitchen • Window need to be replaced with a triple pane window
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
PANTRY (OLD PHONE BOOTH)
Area: 3’6” L x 2’9” W
Description: Currently being used as a food pantry and extra kitchenware storage area.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls and ceiling need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Cabinetry should be installed to maximize storage space • This space can also be converted into additional kitchen space during a kitchen remodel PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
DAY ROOM
Area: 16’10” L x 15’7” W
Description: The Day Room
includes a dry erase board, TV, and
4 chairs.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Two windows need to be replaced with triple pane windows PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
PUBLIC LOBBY / FOYER
Area: 12’10” L x 5’2” W
Description: This is the public entrance off of Cañada Blvd. No special features beside separating the rest of the f ire station from the entrance.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering that side of the station • The public lobby is not secured from the rest of the f ire station. Once inside the lobby/ foyer, there is open access to the whole fire station
PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
OFFICE
Area: L Shaped. Outside dimensions: 22’ x 17’10”, Inside Dimensions: 12’9” x 9’8” Description: The off ice contains 3 computer work stations with access from the foyer/ public lobby. The EMS supplies are also stored in the off ice. There is an exterior door that leads to the side of the station.
Assessment
• Carpet is worn out and flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Three windows need to be replaced with triple pane
• Walls need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
CAPTAIN’S DORM
Area (Dorm): 13’10” L x 9’3” W
Description: Individual dorm with
three individual lockers, plus one
shared closet with drawers/shelves.
The dorm also includes a sink and
mirror.
Assessment
• Carpet is worn and in need of replacement
• Walls need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and placed with painted drywall • Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Two windows need to be replaced with triple pane windows with roller shades to match the rest of the station
• Individual HVAC controls or a split system needs to be installed PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
BATHROOM
Area (total): 12’7” L x 8’3” W
Area (shower): 7’6” L x 3’3” W
Area (toilet/urinal): 5’9” L x 5’1” W
Description: Shared bathroom with one
toilet, one urinal, two sinks, and one
shower.
Assessment
• Bathroom is in need of a remodel to conform to current standards of gender equality and personal privacy
• This space can be converted into two separate individual fully contained bathrooms, each with a sink, toilet, shower, and changing area require additional space • ADA requirements may
• Short term improvements needed:
• Replace urinal with a toilet and install full height partitions for personal privacy • Install full height shower entrance
• Upgrade ventilation to reduce moisture in both the shower and sink areas • Update tile, sinks, mirror, and lighting
• One window need to be replaced with a privacy glass triple pane window PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
UTILITY CLOSET (Locker Room)
Area: 5’ L x 3’ W
Description: Storage area for cleaning supplies with a mop sink.
Assessment
• Shelves need to be upgraded to make the storage area more ef ficient • Additional lighting is need inside of the closet
• Add ventilation to reduce moisture in the room due to the mop sink • Flooring should be replaced with polished concrete or luxury vinyl plank • Walls need general repair, and paint
PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
LOCKER ROOM
Area: 19’1” L x 8’ W
Description: Shared locker area
with 12 individual lockers. The
locker room is also includes a mop
closet and storage for bedding.
Assessment
• Carpet is worn out. Flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Cabinetry stain grade wood and has become worn and chipped, and it should be replaced • Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the locker room PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
FIREFIGHTER & ENGINEER DORMS
Area: 18’ L x 17’9” W
Left Dorm: 9’8” L x 5’8” W
Middle Dorm: 9’8” L x 5’9” W
Right Dorm: 9’8” L x 5’9” W
Description: Shared dorm area for 3 employees. Dorms are separated by 7 foot tall partitions that do not go all the way up to the ceiling. Curtains cover each dorm from the front. There are no doors to each dorm. There is also a treadmill and TV in the dorm room since there is no indoor gym area.
Assessment
• This is a shared dorm space for 3 employees
• The dorm does not allow for personal privacy or gender neutrality with half height partitions and curtains instead of locking doors
• This space is large enough to split into three separate individual dorm rooms • Carpet is worn and needs to be replaced
• Windows need to be replaced with triple pane windows
• Walls need general repair, and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the dorm room • HVAC split system with individual controls OR individual controls for every dorm if one HVAC system
PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
OUTDOOR GYM (Under Carport)
Description: Physical training area
located outside in the back of the
station under the car port.
Assessment
• One of the high priorities at FS24 is to build an enclosed area to house the workout equipment
• The department used funds to purchase this equipment for f irefighters daily mandatory exercise sessions
• Storing the exercise equipment is accelerating the deterioration process of expensive equipment, as some pieces are starting to show rust.
• The equipment is also subject to vandalism and theft due to it being stored in plain sight from the street with no security around the f ire station PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
INTERIOR - GENERAL
Assessment
• All windows should be replaced with triple pane windows • All flooring should be replaced
• High traff ic areas need to be evaluated for polished concrete or luxury vinyl plank options • HVAC system need to be evaluated and have ducts professionally cleaned • All stained and broken drop ceiling tiles need to be replaced • Glued on ceiling tiles need to be scraped off, and replaced with painted drywall • Mattresses should be replaced, they are past their life expectancy. • Walls need general repair, and paint
EXTERIOR - GENERAL
Assessment
• There are no security measures at FS24
• Rear parking area, shed, and gym is completely open to the public • Plymovent roof exhaust motor needs replacement, it is extremely loud for the residential area and the exhaust cover needs to be replaced, as it is held together by miscellaneous supplies from the station
• The station has 2 large sycamore trees in the front yard which cause signif icant allergies for the station personnel and cause a signi ficant amount of time to maintain with the falling leaves and debris
• Landscaping is overgrown, especially the trees on the north border and east border • Walls to the north and east can be built to help block the noise of a fire station for residents and students at the neighboring school
• Trim around the exterior of the station is peeling and needs to be repainted • Ground is uneven in the rear of the station, the concrete is broken and uneven in various locations
• Carport needs a rain gutter to help direct drainage during rain storms • The raised concrete curb in the rear can be removed to increase available parking PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
IMMEDIATE PRIORITIES
• Address the outdoor gym
• Build a fully enclosed area for the gym and workout area utilizing the rear parking area • Address the shared dormitories
• Build out 3 individual dorms with full height walls, locking doors, and 3 HVAC split systems
• Address the shared bathroom
• Option 1: Turn urinal into toilet and install full height partitions for each toilet and the shower area
• Option 2: Turn the space into 2 separate fully contained bathrooms , each with a sink, toilet, and shower. Use mop sink closet & mechanical closet (accessed from the outside) to increase space for two separate bathrooms
• Option 3: Utilize plans similar to existing for Fire Station 27 remodel & seismic update • Automatic rolling gate and perimeter fencing for the rear parking area • Replace mattresses
PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
LONG TERM PRIORITIES
• Fire Station 24 is a prime candidate for a new station built to withstand future changes and increases in personnel or service to community
• Fire Station 24 was constructed in the 1960s to house 4 personnel working on 1 apparatus The community, population, call volume, and resource needs have outgrown this stations • The advantage of building a new Fire Station 24 is the possibility of building off-site so service delivery is not interrupted
• The current lot is not large enough for a modern f ire station • Options to explore for a new station all include parking lots owned by Glendale CC or the Civic Auditorium that are no longer used as heavily due to GCC building a parking structure on campus.
• Lot 34: Located on Cañada Blvd just south of the Babe Herman Little League Field • Lot 31: Located on the corner of E. Mountain St. and N. Verdugo Rd. • Lot 30: Located on N. Verdugo Rd south of E Mountain St • All lots are located away from residential areas, on a major thoroughfares • Moving it slightly to the south would increase availability to the busier parts of Glendale that need additional resources
• All lots have room to build a “100 year” station that can withstand future needs and changes to service delivery
• With a larger lot, the department can assess the possibility of moving Haz Mat training props from the RTC and TC to the Haz Mat Fire Station
• Moving the EMC to this site could allow for expansion in that area of the department • This plan should include the ability to house 10 personnel to allow for growth • 10 personnel can be distributed in various ways: 2 heavy apparatus plus an ambulance or 1 heavy apparatus plus two ambulances
• 10 individual dorm rooms plus 4 individual bathrooms
• Large indoor gym area
• Large kitchen & dining area
• Utilize the space above the apparatus bay, unlike all of our current 2 story stations • Utilize subterranean parking for personnel
• Added classroom or community room
PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 24
SEISMIC ANALYSIS
PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 6 | Page
FIRE STATION #24 – 1734 CANADA BLVD.
Built: 1 9 6 4
Area: 4 , 0 0 0
Stories: 1
Type: RM1 - Brick / Masonry / Concrete Beams / Wood Fr ame
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Remove existing roof and replace to accommodate new anchors and hold down per structural
2. Demo portion of concrete slab to accommodate widening of footings
3. Demo and replace gypsum ceilings at top of cementit ious partitions to accommodate added bracing
4. Demo partial walls and cabinetry and replace as needed
5. Add flexible couplings to existing fluid, gas and fire suppression piping
6. Re-brace existing garage doors per structural requirements
7. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements
8. Add safety devices to light fixture lens covers
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Add blocking to unblocked plywood edges to strengthen diagrams
2. Add anchoring to top of walls to tie sill plate to walls and glulam beams
3. Add framing angles to top of shear walls to tie blocking or rim joist to shear walls
4. Add lateral hold downs to anchor wood joists to walls
5. Widen existing footing
6. Add connections to top of cementitious partition walls to roof structure
7. Add supports to top and bottom of gypsum partitions as needed
8. All non-structural components require lateral bracing and anchorage to building structure
9. Re-bracing existing garage doors to correct for story drift ratio
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Grey scope plans $872,739
This page was intentionally left blank
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
25 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
N. CHEVY CHASE DR.
E. LEXINGTON DR.
N. CHEVY CHASE DR.
ENGINE 25
BLS 25
GFD PARKING
ENGINE 25
BLS 25
GLENDALE FIRE DEPARTMENT FIRE STATION 25
PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
24 26
25 21
22 5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 . 2 0 . 4 0 . 6 0 . 810.1
Miles
Fire Station 25
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 25
OVERVIEW
Address: 353 N. Chevy Chase Dr. (Between E. California Ave. & N. Verdugo Rd.) Ye ar Built: 1988
Story Height: 2 floors above ground
Apparatus Bays: 2 stalls with separate apparatus bay doors. Front and rear access for both stalls • The west stall, or BLS 25’s stall, has limited access in the rear due to personal vehicle parking and/or a Reserve Engine stored to the rear of the stall. BLS 25 backs into the station from N.
Chevy Chase Dr.
Apparatus Assigned: Engine 25 and BLS 25 with space in the app bay for one Reserve Engine Personnel Assigned : Captain, Engineer, two Firefighter Paramedics, and two Ambulance Operators • Max employees that can be housed per 24 hr shift : 6 total Location : Fire Station 25 is downtown Glendale’s eastern station, which also covers Glenoaks Canyon and the western area of Chevy Chase Canyon. It is located just west of the intersection of N. Chevy Chase Dr. and N. Verdugo Rd. The Glendale Adventist Emergency Room is located in 25’s district.
Building: Fire Station 22 is an exposed masonry and steel structure with a combination of pitched and flat metal standing seam roof. Overall construction includes dual glazed exterior windows, hollow metal doors & frames, and an exposed block exterior.
Special Uses: This fire station can store one Reserve Engine inside the apparatus bay.
Security : The property is surrounded by a brick wall along the perimeter with 1 automatic rolling gate for access.
Community Space : There are no additional spaces for community interaction beyond the normal functions of a typical fire station. There is a small dedicated front lobby for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system.
Backup Power: There is an on site diesel backup generator .
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - APPARATUS BAY
Area: 70’5” L x 34’9” W
Stalls staggered by 7’ (BLS stall is 7’ more
forward than the Engine stall, but both
stalls are the same length)
Stalls: 2 full length bays (one heavy
apparatus in each stall, including a tiller
truck, plus a light vehicle)
Access: Separate apparatus bay doors in
both the front and rear of the f ire station.
BLS stall has limited access from the rear of the station.
Assessment
• Apparatus Floor needs to have the cracks f illed in then resealed and painted • Ceiling lights need to be changed out to LED. Current lighting is poor in the app bay • Electric cord reels for apparatus charging need to be changed to higher amperage style • Ceiling paint/drywall showing signs of water damage
• Watch desk cabinets need to be replaced, cabinets are fading and the counter top is chipped and delaminating
• Several electrical outlets are OOS
• Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - TURNOUT LOCKER ROOM
Area: 16’3” L x 8’7” W
Description:
15 open lockers plus
9 cubbies used for
storage of
firefighting turnouts
and additional PPE
Assessment
• Floor needs to have the cracks f illed in then be resealed and polished • Ventilation system needs to be installed to evacuate off gassing turnouts • Turnout locker should have individual HVAC control isolated to that room • Cabinetry is stain grade wood and is fading and chipping and it should be replaced with a more durable material
• Lockers do not appear to be large enough to hold the type of modern gear stored within • Additional lighting should be added for better visibility • Back wall need general repair and paint
PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - SHOP
Area: 21’7” L x 11’4” W
Description: The workshop for Fire Station 25 includes a work bench, deep sink, mop sink, ice maker, and flammable liquids container. The main access is from the apparatus bay.
Assessment
• Floor needs to have the cracks f illed in then be resealed and polished • Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Cabinetry is stain grade wood with plastic laminate countertops • Cabinets are fading and chipping and the countertop is chipped and delaminating, and should be replaced with a more durable material
• 240V outlet should be installed for future use
PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - PUBLIC LOBBY / FOYER with CLOSET
Area: 16’3” L x 4’10” W (Lobby) / 4’10 L x 2’9” W (Lobby Closet) Description: This is the public entrance off N. Chevy Chase Dr. with a counter top for public interaction.
Assessment
• Front door is not equipped with a deadbolt lock which creates a security vulnerability • Inner foyer door needs to have a deadbolt lock to provide for station security and controlled access
• Front entrance needs shades or blinds for privacy and increased security • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • A roll up door similar to FS21’s lobby should be installed at the public countertop to fully secure Fire Station 25
• Walls need general repair and paint
• Closet needs updated shelving so the space is better used for storage PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - OFFICE
Area: 21’9” L x 16’6" W
Description: The off ice contains 3 computer
work stations with access to the public lobby
via countertop
Assessment
• Cabinetry is stain grade wood with plastic laminate countertops and has become worn and chipped and it should be replaced
• Windows need to be replaced with triple pane
• The station is located on N. Chase Chase Dr. and N. Verdugo Rd, which is a major intersection in Glendale
• New window coverings are needed for better climate control and privacy • Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • New off ice chairs are needed to replace older worn chairs PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - EMS SUPPLY CLOSET
Area: 11’8” L x 5’2” W
Description: Storage area solely for EMS restock equipment Assessment
• Cabinetry is stain grade wood and has become worn, and it should be replaced • Floor needs to have the cracks f illed in then be resealed and polished • Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - UTILITY CLOSET
Area: 8’10” L x 6’9” W
Description: Downstairs storage area with a
mop sink and shelves
Assessment
• Cabinetry is stain grade wood and has become worn, and it should be replaced • Floor needs to have the cracks f illed in then be resealed and polished • Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Area around mop sink should be checked for water damage and resealed • Ventilation should be improved to reduce moisture in the room 1st FLOOR - PHONE BOOTH
Area: 3’11” L x 2’4” W
Description: Phone removed several years ago. This
space is not currently being used.
Assessment
• Carpet is worn and in need of replacement
• Flooring should be replaced with polished concrete or luxury vinyl plank • Cabinetry should be installed to maximize storage space • Additional lighting should be added for better visibility • Walls need general repair, and paint
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - DAY ROOM
Area: 21’3” L x 16’9” W
Description: The Day Room includes a large
dry erase board, TV, and 6 chairs.
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
• Lighting needs to be updated for the room
PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - RESTROOM (ADA)
Area: 8’6” L x 8’2” W
Description: Downstairs individual restroom (ADA) with toilet, urinal, and sink.
Assessment
• The restroom needs an update with new tile, cabinetry and a larger mirror • The ventilation and lighting needs to be improved for the restroom to reduce moisture • Add a full height partition and door around the toilet for individual privacy when the restroom is used by more than one person
1st FLOOR - STRIKE TEAM CLOSET
Area: 5’1” L x 1’5” W
Description: Downstairs hallway closet that
currently stores equipment for strike team
deployment
Assessment
• New cabinetry for more eff icient and long lasting storage capabilities • Additional lighting should be added for better visibility PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - LAUNDRY ROOM
Area: 13’9” L x 6’11” W
Description: Downstairs laundry room includes 2
washing machines, 2 dryers, 1 refrigerator, cabinetry, and overflow storage for kitchen items
Assessment
• Update appliances
• Update water supply and drainage. Both washing machines are unable to operate at the same time
• Wood cabinets are worn and needs to be replaced
• Additional cabinets should be add to the back of the room to include storage capabilities • Floor needs to have the cracks f illed in, resealed, and painted or polished • Ventilation should be improved to reduce moisture in the room • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair and paint
PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
1st FLOOR - KITCHEN & DINING AREA
Area: 25‘ L x 16’9 W
Description: Kitchen and dining area includes one refrigerator/freezer, one stove/oven, one microwave, one sink, and 16 individual food lockers
Assessment
• General patch, repair, and painting of walls and ceiling is needed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Ceiling lights need to be upgraded and under cabinet lighting needs to be added for increased visibility
• Cabinetry is paint grade wood which is showing chipping, cracking, and breakage • Individual food lockers are showing wear and need to be updated • Some appliances do not f it properly within the cabinetry • Long term plan should be developed for a complete remodel as the countertop space and dining area are not adequate for 6 full time personnel.
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - LIBRARY (OLD SEWING ROOM)
Area: 16’8” L x 10’3” W
Description: This room was used as a library
when the f ire station was constructed and
housed 4 personnel per shift. It is now being
used to provide a temporary gender neutral
individual dorm.
Assessment
• The library is currently being used as a temporary individual dorm area since the two original dorm rooms do not provide for personal privacy or gender neutrality • Option 1: This space would be best utilized as a second upstairs individual complete bathroom with its own shower, sink, toilet, and changing area. This would provide an upstairs bathroom to allow for gender neutral use. The current upstairs bathroom is a shared bathroom facility for 5 employees (1 Engineer, 2 Firef ighter Paramedics, and 2 Ambulance Operators)
• Option 2: If not converted into a single use bathroom, the library needs to be converted into a proper dorm room including an entry door without a window and cabinetry designed specif ically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage
PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
General room assessment for the old sewing room:
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Windows need to be replaced with triple pane
• The station is located on a busy street corner with heavy traff ic noise & a freeway close by • Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - NORTH DORM (FFPMs)
Area: 21’4” L x 14’9” W
Description: This open dorm is used by the 2
firefighters assigned to E25 per shift. There are
two beds separated by a row of lockers. There
are 6 wood cabinets used as lockers and one
metal locker used to store bedding.
Assessment
• This is a shared dorm space for 2 employees
• The dorm does not allow for personal privacy such as changing clothes or sleeping • This space is large enough to split into two separate dorm rooms • Carpet is worn and needs to be replaced
• Windows need to be replaced with triple pane
• The station is located on a busy street corner with heavy traff ic noise & a freeway close by • Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced along with the temporary metal locker
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - SOUTH DORM (AOs)
Area: 17’2” L x 16’8” W
Description: This open dorm is used by the 2
ambulance operators assigned to BLS25 per
shift and includes cabinetry for 6 employees.
Assessment
• This is a shared dorm space for 2 employees
• The dorm does not allow for personal privacy such as changing clothes or sleeping • This space is large enough to split into two separate individual dorm rooms • Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The station is located on a busy street corner with heavy traff ic noise & a freeway close by • Individual HVAC controls or an HVAC split system needs to be installed PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - UPSTAIRS BATHROOM & MOP CLOSET
Area: 22’ L x 15’7” W
Description: This shared
common bathroom
includes 2 sinks, 2
showers, 2 toilets, and 2
urinals. Also, in this
bathroom is a utility closet
with mop sink
Assessment
• This bathroom does not allow for personal privacy or gender neutrality • When a single employee uses this bathroom, he or she needs to lock the door to obtain privacy
• Option 1: The recommendation for this space is for it to be remodeled and split into three individual bathrooms, each with its own shower, sink, toilet, and changing area • Option 2: General remodel of the space is needed which includes the following:
• Replace the toilet partitions with full height partitions and doors for individual privacy when the restroom is used by more than one person
• The bathroom needs new tile, cabinetry, toilets, sinks, and a urinal • Walls need general repair, and paint
• The ventilation and lighting needs to be improved for the bathroom PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - ENGINEER’S DORM
Area: 17’ L x 16’2” W
Description: Individual dorm assigned to the
E25 Engineer
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The station is located on a busy street corner with heavy traff ic noise & a freeway close by • Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Walls need general repair, and paint
PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - CAPTAIN’S DORM & BATHROOM
Area (Dorm): 19’5” L x 16’8” W
Area (Bathroom): 9’2” L x 8’5” W
Description: Individual dorm and bathroom,
includes sink, toilet, and shower, assigned to the
E25 Captain
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Cabinetry and counter top is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane
• The Captain’s Dorm faces N. Chevy Chase Dr, which is a major thoroughfare in Glendale • Individual HVAC controls or an HVAC split system needs to be installed • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • The bathroom is in need of general updating such as replacing tile, new cabinets, upgraded lighting, upgraded ventilation, a new sink, and a new toilet •
PAGE 23 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
2nd FLOOR - STORAGE CLOSETS
Area: 4’7 L x 2’6’ W (North) Area: 4’7 L x 2’6’ W (South) Description: North closet Description: South closet stores a single vacuum houses full station vacuum system
Assessment
• Carpet is worn and in need of replacement with luxury vinyl plank • Cabinetry needs to be updated to maximize storage potential and ef ficiency • Lighting needs to be added for better visibility
2nd FLOOR - GYM
Area: 28’7” L x 15’4” W
Description: Indoor gym area for daily, mandatory physical training Assessment
• Flooring needs to be replaced for a non-slip rubber style that provides more cushion and sound absorbing properties such as horse stall mats or similar style used in public gyms • Walls need general repair, and paint
• Windows need to be replaced with triple pane for better climate control • Ventilation should be improved to reduce moisture in the room • Individual HVAC controls or an HVAC split system needs to be installed PAGE 24 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
INTERIOR - GENERAL
Assessment
• All windows should be replaced with triple pane for better sound blocking and climate control eff iciency
• All carpet should be replaced
• Evaluate flooring options for high traff ic areas such as polished concrete or luxury vinyl plank
• Ventilation system need to be evaluated and have the duct work professionally cleaned • All stained and broken ceiling tiles need to be replaced • Mattresses should be replaced. They are past their life expectancy. • New paint throughout the station after repairing all damaged walls • Block walls need to be resealed, as they leak when it rains • Replace stain grade wood cabinetry with a more durable material • Patch and paint apparatus bay ceiling
• Repair rear apparatus bay roll up door, currently it is OOS
EXTERIOR - GENERAL
Assessment
• Rear gate needs updated features including:
• new motor to open the gate faster so traff ic isn’t backed up on Lexington • Safety beam and safety impact device
• Auto open from the parking area when a vehicle pulls up to the gate • Change keypad inside the station to push button instead of numeric keypad • Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting
PAGE 25 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
IMMEDIATE PRIORITIES
• Address the shared common dormitories upstairs
• There is enough square footage to turn the 2 open dorms into 4 individual dorms • Replace windows, carpets, cabinetry, ceiling tiles, and paint at the same time • Address individual HVAC controls or convert to split systems in each dorm • Address the shared bathroom upstairs
• There is enough square footage to turn the shared bathroom, utility closet, & into 3 individual complete restrooms (shower, sink, toilet, changing area) • Replace mattresses
• Address worn carpet/ flooring and replace
• Triple pane windows with new window coverings for privacy, security, and more ef ficient cooling in the summer
LONG TERM PRIORITIES
• Fire Station 25 is a prime candidate to completely remodel the interior to withstand future changes and increases in personnel or service to community. • Fire Station 25 was constructed in the 1980s to initially house 4 personnel working on 1 apparatus. The community, population, call volume, and resources needed has out grown both of these stations.
• Create a long term plan and timeframe on completely renovating the interior of the station to turn it into a “100 year station”
• This plan should include the ability to house 10 personnel to allow for growth • 10 personnel can be distributed in various ways: 2 heavy apparatus plus an ambulance or 1 heavy apparatus plus two ambulances, or an ambulance & squad • Station 25 can house a Tiller Truck inside its apparatus bay, if needed • 10 individual dorm rooms upstairs plus 3 individual bathrooms • Larger gym area
• Larger kitchen & dinning area with expansion into patio area • Utilize the space above the apparatus bay (currently vaulted ceilings) PAGE 26 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
• Update kitchen and dining area.
• Build out the kitchen into the patio area for more square footage • Update appliances to meet city council priorities
• Update HVAC and include controls for each zone or room • Install vehicle lift to increase available parking in the rear of the station PAGE 27 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 25
SEISMIC ANALYSIS
PAGE 28 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 7 | Page
FIRE STATION #25 – 353 N. CHEVY CHASE DR.
Built: 1 9 8 8
Area: 1 2 , 0 0
Stories: 2
Type: RM1 - Brick / Masonry / Steel Frame / Wood joist
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Remove and reinstall wall mounted electrical and other items to accommodate structural work on front and rear walls of engine room
2. Remove and replace existing roofing to provide access to install structural anchoring required
3. Remove and replace miscellaneous building elements to accommodate installation of widened footing
4. Re-brace existing garage doors per structural requirements
5. Brace all high cabinets, equipment, ceiling systems a n d o v e r h e a d u t i l i z e s p e r s t r u c t u r a l requirements, remove and replace T-bar ceilings as needed for access
6. Add flexible couplings to existing fluid, gas and fire suppression piping
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Install additional anchors and hold downs at diaphragm framing to wall transfer points
2. Install new moment frames at high bay entrances
3. Widen existing footings and new moment frames
4. All non-structural components require lateral bracing and anchorage to building structure
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $1,648,370
This page was intentionally left blank
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
26 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
E26
BLS26
LIBRARY
T26
LIBRARY
N. BRAND BLVD.
T26
E26
BLS26
FS26
GFD
PARKING
GFD PARKING
GFD PARKING GFD PARKING
GFD
PARKING
LIBRARY
PARKING
FS DRIVEWAY
N. BRAND BLVD.
N. BRAND BLVD.
GLENDALE FIRE DEPARTMENT FIRE STATION 26
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
27 26
21 22
5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 .2 0 .4 0 .6 0 .810.1
Miles
Fire Station 26
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 26
OVERVIEW
Address: 1145 N. Brand Blvd. (Between W. Dryden St. & W. Stocker St.) Ye ar Built: 1951 (Oldest in the GFD)
Story Height: 2 floors above ground
Apparatus Bay: 3 stalls with separate apparatus bay doors. Front and rear access for the south stall (Truck 26). There is no rear access is for the other two stalls. Engine 26 and BLS 27 back into the fire station from Brand Blvd.
Apparatus Assigned: Truck 26, Engine 26, and BLS 26. There is no additional space for Reserve Apparatus or Ambulance.
Personnel Assigned : 10 total per shift. Two Captains, two Engineers, four Firefighter Paramedics, and 2 Ambulance Operators
• Max employees that can be housed per 24 hr shift : 10 total Location : Fire Station 26 is one of 3 key fire stations in Glendale. It is location just north of downtown Glendale. The district consists of high rise commercial and residential structures, multifamily dwellings, single family dwellings, multiple freeways, and wildland urban interface.
Building: Fire Station 26 is located open a zero property line lot with the north side sharing a wall with a public library. It is masonry and steel structure with a flat roof. The exterior is finished with exposed brick. The exterior windows are single glazed aluminum and hollow metal doors and door frames.
Special Uses: Truck 26 is a paramedic resource and also is the first truck that moves up to other cities during automatic aid agreements. This fire station shares the lot with an attached Glendale public library
Security : The property is secured with an access gate behind the station and block wall/fence surrounding the property. The rear parking area gate is open to the public during the public library’s normal operating hours. There is no additional gate that separates the library from the station parking areas.
Community Space : There is no additional space for community interaction beyond the normal functions of a typical fire station. There is no dedicated front lobby or foyer for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system Backup Power: There is an on site diesel backup generator PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
APPARATUS BAY
Area: 53’9” L x 39’11” W
Stalls: 3 bays. Each bay has just enough
space for the Tiller Truck, Engine, and
Ambulance
Access: Separate apparatus bay doors in
the front for each apparatus. Rear access
for only the Tiller Truck. The Engine and
Ambulance back in from the front.
Assessment
• Apparatus f loor needs to have the cracks f illed in, sealed, and painted • Walls need general repair and paint
• Additional ceiling lights need to be installed. Current lighting is poor in the app bay • Electric cord reels for apparatus charging need to be changed to higher amperage style • Floor drains should be installed
• New compressor rated at a higher capacity is needed to f ill apparatus tires • Middle apparatus door intermittently does not close all the way. Open FSR for months. • Workout equipment is in the apparatus bay. This is not ideal as the gym is exposed to diesel exhaust from all 3 apparatus.
• Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
TURNOUT ROOM & LOCKERS
Description: A combination of 20
individual lockers with doors and 1 closet
with 10 individual open lockers used for
storage of f irefighting turnouts and
additional PPE for 30 personnel.
Assessment
Closet
• Floor needs to have the cracks f illed in, sealed, and painted • A door that properly seals the storage area is needed to keep PPE from being exposed to diesel exhaust fumes
• Ventilation system needs to be installed to evacuate off gassing or moisture in turnouts • Turnout locker should have individual HVAC control isolated to that room Lockers
• Lockers are in good condition
• A ventilation system behind the lockers needs to be installed to evacuate off gassing or moisture in turnouts
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
SHOP
Description: Newly remodeled workshop
includes a work bench, rolling tool box,
parts cleaner, and shelving and
cabinetry.
Assessment
• Cabinetry is in good condition
• There is an open vent in the Shop that leads directly to the Kitchen • 240V outlet should be installed for future use
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
OUTDOOR GYM (Apparatus Bay)
Area: 17’6” L x 15’4” W
Description: Physical training area
located inside the apparatus bay behind
Engine 26 and BLS 26
Assessment
• Fire Station 26 has no formal exercise room and instead takes space from the Apparatus Bay
• The gym equipment, all though protected from the outside elements, is exposed to diesel exhaust from two apparatus on a daily basis
• The gym equipment and f looring is new and in good condition PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
1st FLOOR - OFFICE
Area: L Shaped
Outside Dimensions: 20’4” x 14’4”
Inside Dimensions: 10’2” x 5’9”
Description: The off ice contains 3
computer work stations with access from
the apparatus bay. The front entry door
into Fire Station 26 leads directly to the
Office with no additional means of
security from the rest of the f ire station.
Assessment
• The Off ice is in need of a full remodel, as it was not addressed in the recent renovations • Carpet is worn out and flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint
• Electrical is def icient to support modern needs
• Front entrance should be replaced with triple pane windows and a door with improved seals for better climate control and privacy
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the locker room PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
1st FLOOR - LAUNDRY ROOM
Area: 12’3” L x 4’9” W plus extra storage space under the stairs Description: The Laundry Room includes a residential washer, dryer, ice maker, and storage space
Assessment
• Fire Station 26 needs a second washing machine for gross decontamination reduction • Floor needs to have the cracks f illed in then resealed and painted • Walls need general repair and paint
• New cabinetry should be installed to maximize storage space • Additional lighting is need inside of the laundry room, especially towards the rear • The room needs proper ventilation for to reduce moisture in the room PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
1st FLOOR - RESTROOM (ADA)
Area: 9’8” L x 6’9” W
Description: Downstairs individual restroom (ADA) with a toilet, urinal, sink, and a mop sink Assessment
• The downstairs individual restroom was part of a recent renovation project and is in good condition
• Grout needs to be redone between all of the restroom tiles 1st FLOOR - BACK OFFICE (STUDY ROOM)
Area: 10’7” L x 7’2” W
Description: Small off ice with two
computer work stations each with a desk
and chair, printer, TV, and cabinetry
Assessment
PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
• The back off ice or study room was part of a recent renovation project and is in good condition
1st FLOOR - PANTRY (MECHANICAL ROOM)
Area: L Shaped
Outside Dimensions: 16’7” x 14’2”
Inside Dimensions: 11’1” x 7’8”
Description: Extra storage space used for kitchen and cleaning supplies. The room also includes a refrigerator and access to the f ire station utilities (heater ands electrical) Assessment
• The pantry or mechanical room was addressed during a recent renovation project • It appears as if the room was not completed
• There are open holes in the ceiling
• There are exposed utilities
• Open FSR on removed utility components no longer used • Open FSR on light covers
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
1st FLOOR - DAY ROOM
Area: 244” L x 14’ W
Description: The Day Room includes a
large dry erase board, TV, and 10 chairs.
Assessment
• The Day Room was addressed during a recent renovation project and is in good condition • New items include an HVAC split system, window coverings, wall repair & paint, and new carpet
PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
1st FLOOR - KITCHEN & DINING AREA
Area: 28’2” L x 19’1” W
Description: Kitchen and dining area includes 3 refrigerator/freezer, stove/oven, two microwaves, one sink, and 33 food lockers
Assessment
• The Kitchen and Dining Area were completely remodeled during a recent renovation project and is in good condition
• Some closet door is broken and chipped and needs to be replaced PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
2nd FLOOR - DORMS
Area: Avg Dorm 19’ L x 7” W (#2 - #6)
Smallest Dorm: 10’1” L x 9”10” W (#9)
Description: 10 individual dorms w/ a bed, 3 lockers, small desk, chair, window, and lockable interior door
Assessment
• Dorms were slightly touched up during the recent upstairs remodel • Walls were repaired and painted, new window coverings installed, and new carpet installed during a recent renovation project
• Windows need to be replaced with triple pane
• Individual HVAC controls or an HVAC split system needs to be installed • Ceiling has some bubbling paint above the stairwell on the 2 nd floor PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
2nd FLOOR - UPSTAIRS COMMON BATHROOM
Area: 14’7” L x12’ W
Description: This shared common
bathroom includes 2 sinks, 2 showers, 3
toilets, and 1 urinal
Assessment
• This common bathroom was recently
renovated during an upstairs remodel a
few years ago
• This bathroom does not allow for
personal privacy or gender neutrality
• When a single employee uses this
bathroom, they need to lock the door
to obtain privacy
• The recommendation for this space is for it to be remodeled and split into two individual bathrooms, each with its own shower, sink, toilet, and changing area plus one restroom with a toilet and sink
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
2nd FLOOR - UPSTAIRS INDIVIDUAL BATHROOM
Area: 12’4” L x 6’11” W
Description: Individual bathroom with
one toilet, one sink, one shower, with
space for changing.
Assessment
• Grout needs to be redone between all
of the restroom tiles
• This individual bathroom was recently
renovated during an upstairs remodel a
few years ago
PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
2nd FLOOR - UTILITY CLOSET
Description: Upstairs utility closet with a mop sink
Assessment
• The Utility Closet was completely remodeled during recently renovated during an upstairs remodel a few years ago recent renovation project and is in good condition 2nd FLOOR - BEDDING CLOSET
Description: Closet used to store personal bedding
Assessment
• Cabinetry needs to be updated to maximize storage potential and ef ficiency • Lighting needs to be added for this space
• Ventilation should be added to reduce moisture in the room PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
INTERIOR - GENERAL
Assessment
• Ventilation system needs to be evaluated and have the duct work professionally cleaned • All windows should be replaced with triple pane for better noise reduction and climate control eff iciency
• All flooring should be replaced
• High traff ic areas need to be evaluated for polished concrete or luxury vinyl plank options • Some walls need general repair and paint
• Mattresses should be replaced, they are past their life expectancy
PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
EXTERIOR - GENERAL
Assessment
• Fire Station 26 need to the flat roof evaluated for leaks, as there was extensive damage to the corner dorm
• The rear of the station needs to be repaved, the concrete is broken and uneven in various locations. Some areas were recently redone but is now cracked and/or uneven. • Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting
• Rear parking area completely open to the public during library business hours, a separate gate should be installed on the f ire station side for increased security
PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
IMMEDIATE PRIORITIES
• Fire Station 26 need to the flat roof evaluated for leaks, as there was extensive damage to the corner dorm
• All windows should be replaced with triple pane for better noise reduction and climate control eff iciency
• Address the upstairs shared open bathroom
• Option: Turn the space into 2 separate fully contained bathrooms (each with a sink, toilet, and shower) and 1 restroom (toilet and sink)
• Mattresses should be replaced, they are past their life expectancy • Complete overhaul of the Front Captain’s Of fice. The room was not addressed in the last 2 remodels
PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
LONG TERM PRIORITIES
• Fire Station 26 is the oldest fire station in the GFD. It would be best suited to rebuild completely on the existing lot withstand future changes and increases in personnel or service to community.
• Fire Station 26 was constructed in the 1950s to initially house 8 personnel working on 2 apparatus. The community, population, call volume, and resources needed in Glendale has out grown this station.
• If the opportunity to take over the library arises, the fire department needs to make a remodel at Fire Station 26 a high priority. This would allow the fire department to expand its capabilities.
• Fire Station 26 is currently in an ideal location. It is in a very dense area where a majority of the incidents occur.
• Its location on Brand is a major thoroughfare that divides the city in half • Quick access to the 134 freeway and other streets that provide quick access to other districts
• Take over the public parking lot to the rear of the station • This can free up parking spaces for GFD employees and give back two parking spots on Brand that are designated for f ire department vehicles • Build a structure that can house a reserve truck, engine, and/or ambulance • Build a structure to house the f ire station gym to replace the current gym which is exposed to diesel exhaust in the apparatus bay
• Create a long term plan and timeframe on completely renovating the interior of the station to turn it into a “100 year station”
• This plan should include the ability to house 12 personnel to allow for growth • This would allow space for an additional resource in the future • 12 individual dorm rooms plus 4 individual bathrooms
• Larger kitchen & dinning area
• A 3rd and 4th story to include a community space for the public or classroom for the personnel
• Add subterranean parking for personal vehicles
PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 26
SEISMIC ANALYSIS
PAGE 23 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 8 | Page
FIRE STATION #26 – 1145 N. BRAND
Built: 1 9 5 1
Area: 7 , 5 0 0 / 5 , 1 0 0 1 s t / 2 , 4 0 0 2nd (Library not included) Stories: 2
Type: RM1 - Masonry / Wood Frame
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Remove and replace existing roofing to provide access to install structural anchoring required
2. Remove and replace miscellaneous building elements to accommodate installation of widened footing
3. Remove and replace miscellaneous building elements to accommodate reinforcement of columns and beams in engine room
4. Demo and replace gypsum ceilings at top of cementitious partitions to accommodate added bracing
5. Add flexible couplings to existing fluid, gas and fire suppression piping
6. Re-brace existing garage doors per structural requirements
7. Brace all high cabinets, equipment, ceiling systems a n d overhead utilizes per structural requirements, remove and replace T-bar ceilings as needed for access
8. Add safety devices to light fixture lens covers
9. Add lateral bracing to ceiling systems
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Replace existing sheeting with new plywood structural panels on floor and roof areas
2. Install additional wall and diaphragm sheer wall anchors
3. Add welded steel plates to flanges and webs of steel structural members
4. All non-structural components require lateral bracing and anchorage to building structure
5. Re-bracing existing garage doors to correct for story drift ratio
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $884,498
This page was intentionally left blank
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
27 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
WESTERN AVE.
ENGINE 27
BLS 27
ALLEY
WESTERN AVE.
ALLEY
GFD PARKING
ENGINE 27
BLS 27
GLENDALE FIRE DEPARTMENT FIRE STATION 27
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
27 21
5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 . 1 5 0 . 3 0 . 4 5 0 . 6 0 . 7 50.07
Miles
Fire Station 27
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 27
OVERVIEW
Address: 1127 Western Ave. (Between W. Glenoaks Blvd. & Glenwood Rd.) Ye ar Built: 1968
Story Height: 1 Floor above ground
Apparatus Bays: 2 stalls with single apparatus bay doors in the front and rear. Rear access only for the Engine (BLS backs into the station from the front).
Apparatus Assigned: Engine 27 and BLS 27 (No additional space for Reserve Apparatus/Ambulance) Personnel Assigned : Captain, Engineer, two Firefighter Paramedics, and two Ambulance Operators (Ambulance Operators work on a 12 hour shift only)
• Max employees that can be housed per 24 hr shift : 4 total Location : Fire Station 27 is located in the western part of downtown Glendale. This fire station is ¾ of a mile from the Glendale/Burbank border. The immediate area around the station has a dense population with many multifamily dwellings. The district also has wildland urban interface to the north, two major freeways to the south, and a commercial area to the south.
Building: Fire Station 27 is a wood framed structure with a pitched asphalt shingle roof. The exterior is finished with a combination stucco and brick veneer. The exterior windows are single glazed aluminum framed windows. The exterior doors are hollow metal doors and frames. The interior doors are hollow wood doors with metal frames.
Special Uses: This fire station houses the only part time, 12 hour, BLS ambulance. No other special apparatus or assignments are attached to this fire station.
Security : The property is secured by an access gate from the alley. There is a combination of chain link, wood fence, and block wall that surrounds the fire station.
Community Space : There is no additional space for community interaction beyond the normal functions of a typical fire station. There is a small foyer near the front door for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system.
Backup Power: There is an on site diesel backup generator PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
APPARATUS BAY
Area: 58’8” L x 28’6” W
Stalls: 1 full length bay (Engine) and 1 half
length bay (BLS)
Access: Single apparatus bay doors in both
the front and rear of the f ire station for both
stalls. Rear access for the Engine only since
the gym & workout equipment is in the
apparatus bay behind the BLS ambulance.
The ambulance backs into the apparatus bay
from the front.
Assessment
• Apparatus f loor needs to have the cracks f illed in, sealed, and painted • Walls need general repair and paint
• Electric cord reels for apparatus charging need to be changed to higher amperage • There is an ice maker in the apparatus bay. It should be relocated away from an area exposed to diesel engine exhaust.
• Workout equipment is in the apparatus bay. This is not ideal as the gym is exposed to diesel exhaust from 2 apparatus.
• Floor drains should be installed
• Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
ENGINE 27
BLS 27
GLENDALE FIRE DEPARTMENT FIRE STATION 27
TURNOUT CLOSET & LOCKERS
Description: A combination of 2 small closets and 3 individual metal lockers in the apparatus bay used for storage of f irefighting turnouts and additional PPE for 12 personnel.
There is a single hook and 2 shelves for each employee’s gear Assessment
Closet
• Floor needs to have the cracks f illed in, resealed, and painted • Shelves and hooks need to be replaced with individual storage lockers • Doors that properly seal the storage are needed to keep diesel exhaust from being exposed to the PPE
• Ventilation system needs to be installed to evacuate off gassing or moist turnouts • Locker space is inadequate and can be increased if utility closet and hallway leading to the locker room (middle door) are converted into additional locker space • Void space above lockers should be assessed to increase height and total square footage Lockers
• Lockers are made of painted metal and in good condition • It would be ideal to utilize fully enclosed lockers to keep diesel exhaust from being exposed to the PPE
• Install additional metal lockers next to the BLS to store AO’s PPE PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
UTILITY CLOSET
Description: Closet is used for storage of towels and apparatus cleaning supplies Assessment
• Floor needs to have the cracks f illed in, sealed, and painted • Cabinetry should be installed to maximize storage space. • Walls need general repair and paint
• Additional lighting is need inside of the closet
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the storage area
SHOP
Area: 8’6” L x 5’10” W
Description: The work shop includes a work
bench, air compressor, and shelves.
Assessment
• New compressor rated at a higher capacity is needed to f ill apparatus tires • Floor needs to have the cracks f illed in, resealed, and painted • New work bench and cabinetry is needed, the current wood is worn, faded, and chipped • Walls need general repair and repaint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Additional lighting is needed inside of the shop
• A proper ventilation system should be installed
• 240V outlet should be installed for future use
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
LAUNDRY ROOM
Area: 13’3” L x 9’4” W
Description: The Laundry Room includes
one washer and dryer, refrigerator, one
bed, and a desk/shelf for one computer
work station
Assessment
• Fire Station 27 needs a second washing machine for gross decontamination reduction • Floor needs to have the cracks f illed in then resealed and painted • Walls need general repair and paint
• Two windows need to be replaced with a triple pane windows and new window coverings • Individual HVAC controls or an HVAC split system needs to be installed • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the laundry area • This room, along with the shop, needs to be evaluated for remodel. Options should include turning the laundry room into one or two dorm rooms or both the laundry room and the shop into two dorm room, with the intention BLS27 becoming a full time staffed unit in the future.
PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
KITCHEN & DINING AREA
Area: 15‘6 L x 12’10’ W (+3’ of locker depth)
Description: Kitchen with dining table, 4
chairs, stove/oven, one refrigerator, one
microwave and 12 personal lockers
Assessment
• Kitchen is in need of a full remodel
• Cabinetry is paint grade wood which is showing chipping, cracking, and breakage at the edges and drawer/door fronts
• Walls and ceiling need general repair and paint
• Storage space needs to be increased and made more eff icient. • There is very little counter space for food prep and not enough space to store small appliances and kitchenware
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the kitchen • Window need to be replaced with a triple pane window and a new window covering PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
PANTRY (OLD PHONE BOOTH)
Area: 3’6” L x 2’9” W
Description: Currently being used as a food pantry and extra kitchenware storage area
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls and ceiling need general repair and paint
• New cabinetry should be installed to maximize storage space • Additional lighting is need inside of the pantry
• This space can also be converted into additional kitchen space during a kitchen remodel to keep all kitchenware inside the kitchen and away from the apparatus bay PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
DAY ROOM
Area: 20’8” L x 15’7” W
Description: The Day Room includes a dry erase board, TV, and 4 chairs. The space behind the chairs includes cardio workout equipment (stationary bike, treadmill, elliptical) Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls need general repair, and paint
• 2 windows need to be replaced with triple pane windows. The Day Room faces Western Ave.
PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
PUBLIC LOBBY / FOYER
Area: L Shaped. Outside dimensions:
13’2” x 11’6”, Inside Dimensions: 8’8 x 7’1”
Description: This is the public entrance
off of Cañada Blvd. No special features
beside separating the rest of the f ire
station from the entrance.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering that side of the station • Front entrance needs shades or blinds for privacy and increased security • The public lobby is not secured from the rest of the f ire station. Once inside the lobby/ foyer, there is open access to the whole fire station
EMS SUPPLY CLOSET
Description: Storage area for EMS
restock equipment
Assessment
• Shelves need to be upgraded to make a
more eff icient storage area
• Additional lighting is need inside of the
closet
• The sliding doors for the closet are not properly rated, do not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the EMS supplies. • Closet should also contain locks, especially with its location in near the public entrance.
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
OFFICE
Area: L Shaped. Outside
Dimensions: 17’8” x 11’11”, Inside
Dimensions: 9’9” x 5’8”
Description: The off ice contains 2
computer work stations with
access from the foyer/public lobby.
Assessment
• Carpet is worn out. Flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Three windows need to be replaced with triple pane
• Walls need general repair, and paint
• Drop ceiling tiles are discolored and need to be replaced PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
CAPTAIN’S DORM
Area (Dorm): 9’6” L x 9’1” W
Description: Individual dorm with
three individual lockers, plus one
shared closet for bedding
Assessment
• Walls need general repair and paint
• Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Windows need to be replaced with triple pane windows and new window coverings • Individual HVAC controls or a split system needs to be installed PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
BATHROOM
Area (total): 12’3” L x 8’2” W
Area (shower): 6’11” L x 3’3” W
Area (toilet/urinal): 5’7” L x 4’7” W
Description: Open shared bathroom with
one toilet, one urinal, two sinks, and one
shower.
Assessment
• Bathroom is in need of a remodel to conform to current standards of gender equality and personal privacy.
• This space can be converted into two separate individual fully contained bathrooms, each with a sink, toilet, shower, and changing area
• ADA requirements may require additional space
• Short term improvements needed:
• Replace urinal with a toilet and install full height partitions for personal privacy • Install full height shower entrance
• Upgrade ventilation to reduce moisture in both the shower and sink areas • Update tile, sinks, mirror, and lighting
• One window need to be replaced with a privacy glass triple pane window PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
UTILITY CLOSET (Locker Room)
Area: 4’11” L x 4’2” W
Description: Storage area for cleaning supplies with a mop sink Assessment
• Shelves need to be upgraded to make the storage area more ef ficient • Additional lighting is need inside of the closet
• Add ventilation to reduce moisture in the room due to the mop sink • Flooring should be replaced with polished concrete or luxury vinyl plank • Walls need general repair and paint
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
LOCKER ROOM
Area: 21’10” L x 6’11” W
Description: Shared locker area with 12
individual lockers. The locker room is also
includes a mop closet and storage for
bedding
Assessment
• Carpet is worn out. Flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint
• Cabinetry is stain grade wood and has become worn and chipped, and it should be replaced
• Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the locker room PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
FIREFIGHTER & ENGINEER DORMS
Area: 17’11 L x 17’10” W
Left Dorm : 8’ L x 7’9” W
Middle Dorm: 9’7” L x 8’” W
Right Dorm: 9’6” L x 7’9” W
Description: Shared dorm
area for 3 employees. Dorms
are separated by 7 foot tall
partitions that do not go all
the way up to the ceiling.
There is also one chair and
plastic shelving for bedding in
the common area.
Assessment
• This is a shared dorm space for 3 employees
• The dorm does not allow for personal privacy or gender neutrality with half height partitions and non-locking doors
• This space is large enough to split into individual dorm rooms • Options for 3 or 4 individual dorms should be evaluated • Carpet is worn and needs to be replaced
• Windows need to be replaced with triple pane windows and new window coverings • Walls need general repair and paint
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the dorm room • HVAC split system with individual controls OR individual controls for every dorm if one HVAC system
PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
OUTDOOR GYM (Apparatus Bay)
Description: Physical training area located inside the apparatus bay behind BLS 27 Assessment
• Fire Station 27 has no formal exercise room and instead takes space from the Apparatus Bay
• The gym equipment, all though protected from the outside elements, is exposed to diesel exhaust from two apparatus on a daily basis
• The gym equipment and f looring is new and in good condition PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
INTERIOR - GENERAL
Assessment
• All windows should be replaced with triple pane windows • All flooring should be replaced
• High traff ic areas need to be evaluated for polished concrete or luxury vinyl plank options • HVAC system need to be evaluated and have ducts professionally cleaned • All stained and broken drop ceiling tiles need to be replaced • Glued on ceiling tiles need to be scraped off, and replaced with painted drywall • Mattresses should be replaced, they are past their life expectancy. • Walls need general repair and paint
EXTERIOR - GENERAL
Lot Dimensions : 167’3 D x 78’8” W
Assessment
• The raised concrete curb (previously used as a hose drying area) and the planter in the rear of the parking lot should be removed to increase available parking for 7 vehicles • Front grass area in front of the flag pole can be turned into 2 parking spaces. One for Utility 27 and for the public.
• Limit access to the alley be added gated on both ends. It is an extremely busy alley and dangerous with cars traveling at a high rate of speed. Cars also park in the alley for quick access to the businesses on that side of the shopping center. The alley is the only access into the f ire station for Engine 27 and personal vehicle parking. • Rear gate needs a push button inside the station. Employees use a remote to access the gate
• Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting
• The fire station is set back 35’ from the sidewalk, allowing room for expansion to meet current demands of a local f ire station located in a dense urban area.
PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
IMMEDIATE PRIORITIES
• Add two parking spaces in the front of the station to reduce congestion in the rear parking. Utilize the open space in front of the f lag pole to park Utility 27 and a second vehicle.
• Address the shared dormitories and add the ability to house 2 additional personnel for a total of 6 employees for a 24 hour shift.
• Option 1:
• Build 3 individual dorms with full height walls, locking doors, and HVAC split systems
• Turn the Shop and Laundry Room into 2 separate individual dorms with lockers • Install a large, non-occupied shed with utilities at the rear of the station to house the supplies and equipment from the Shop & Laundry Room (Refrigerator, two washing machines, dryer, work bench, cabinets, shelves) • Add gear lockers next to BLS 27
• Option 2:
• Build 4 individual dorms w/ full height walls, locking doors, and HVAC split systems • Turn the Laundry Room into one separate individual dorms with lockers • Move the washing machine and dryer into the Shop (remove mop sink to create more square footage)
• Move the refrigerator to the app bay next to the BLS along the south wall • Install a large, non-occupied shed with utilities at the rear of the station to house the supplies and equipment from the Shop & Laundry Room (Refrigerator, two washing machines, dryer, work bench, cabinets, shelves) • Add gear lockers next to BLS 27
• Address the shared bathroom
• Option 1: Turn urinal into toilet and install full height partitions for each toilet and the shower area
• Option 2: Turn the space into 2 separate fully contained bathrooms , each with a sink, toilet, and shower. Use mop sink closet & mechanical closet (accessed from the outside) to increase space for two separate bathrooms
• Replace mattresses
PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
LONG TERM PRIORITIES
• Fire Station 27 is a prime candidate for a new station built to withstand future changes and increases in personnel and/or service to community.
• Fire Station 27 was constructed in the 1960s to house 4 personnel working on 1 apparatus.
The community, population, call volume, and resources needed has out grown the station. • Create a long term plan and timeframe to completely tear down the current f ire station and rebuild on-site or f inding another location to build a new f ire station. • Option of rebuilding on-site:
• Fire Station 27 is currently in an ideal location. It is in a very dense area where a majority of the incidents occur.
• Its location near major thoroughfares including Western, Glenoaks, San Fernando, Western On/Off ramps of the 5 freeway with quick access to other districts and Brand Park.
• Option of building a new station off site:
• Uninterrupted district coverage with Engine 27 & BLS 27 remaining in-service until the new f ire station is built.
• Ability to f ind a large enough lot for the demands of the new f ire station • Room to build a “100 year” station that can withstand the test of time • This plan should include the ability to house 10 personnel to allow for growth • 10 personnel can be distributed in various ways: 2 heavy apparatus plus an ambulance or 1 heavy apparatus plus two ambulances
• 10 individual dorm rooms plus 3 individual bathrooms and one restroom • Large, indoor gym area
• Large kitchen & dinning area
• Utilize the space above the apparatus bay, unlike all of our current 2 story stations • Utilize subterranean parking for personnel
• Added classroom or community room
PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 27
FINISH PLAN (From FY 22/23)
PAGE 23 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
FD
FD
WH
CAPTAIN'S ROOM
103
(E) ENTRY
101
CAPTAINS OFFICE
102
DORM #2
109
DORM #3
110
DORM #1
108
TOILET #1
107
TOILET #2
105
MECH. RM
111
WORK AREA
104A
W/D
106
FURN.
(E) CLOSET
113
(E) HOSE RACK
114
(E) TURN OUT CLOTHING
115
(E) SIGNAL EQUIPMENT
116
MED CAB
117
LOCKER AREA
104B
FINISH PLAN
A-2GLENDALE FIRE STATION #27
1/4" = 1'-0"
GLENDALE FIRE DEPARTMENT FIRE STATION 27
SEISMIC ANALYSIS
PAGE 24 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 9 | Page
FIRE STATION #27 – 1127 WESTERN AVE.
Built: 1 9 6 7
Area: 3,900
Stories: 1
Type: RM1 - Brick / Masonry Shear Walls / Wood Framing
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Remove and replace existing roofing to provide access to install structural anchoring required
2. Remove and replace miscellaneous building elements to accommodate installation of widened footing
3. Demo and replace gypsum ceilings at top of cementitious partitions to accommodate added bracing
4. Add lateral bracing to ceiling systems
5. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements, remove and replace T-bar ceilings as needed for access
6. Add safety devices to light fixture lens covers
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Add blocking to roof diaphragms
2. Add anchor at top of wall at sill plate and glue lam beams
3. Add framing angles to top of shear walls
4. Add lateral holdowns to anchor wood joists
5. Widen existing footing
6. All non-structural components require lateral bracing and anchorage to building structure
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $942,892
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
28 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
COMMUNITY AVE.
NEW YORK AVE.
E28
AU28
FS DRIVEWAY
GYM
NEW YORK AVE.
GYM
FS28 DRIVEWAY
COMMUNITY AVE.
AU28E28
GFD PARKING
GLENDALE FIRE DEPARTMENT FIRE STATION 28
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
28 29
5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
00 . 1 5 0 . 3 0 . 4 5 0 . 6 0 . 7 50.07
Miles
Fire Station 28
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 28
OVERVIEW
Address: 4410 New York Ave. (Between Community Ave. & Mary St.) Ye ar Built: 1955
Story Height: 1 Floor above ground
Apparatus Bays: 2 stalls with separate apparatus bay doors. Front and rear access for both stalls available. The rear access is limited for AU28 due to storage in the south stall along with the turn being too tight for heavy apparatus. AU28 backs into the fire station from the front.
Apparatus Assigned: Engine 28 and Air & Light Unit 28 (AU28). There is no additional space for Reserve Apparatus or Ambulance.
Personnel Assigned : 4 total per shift. Captain, Engineer, and two Firefighter Paramedics • Max employees that can be housed per 24 hr shift : 4 total Location : Fire Station 28 is a single engine station which also houses AU28 and our SCBA Program.
Personnel assigned at station 28 cross staff the Fire Engine and the Air & Light Unit. This district contains mostly single family dwellings but also includes a significant amount of wildland urban interface and a major freeway.
Building: Fire Station 28 is a combination masonry and wood framed structure with a pitched roof finished with asphalt shingle roofing material. The exterior finish is stucco with some exposed masonry elements and wood trim. A detached back storage shed was converted into the gym.
Special Uses: This fire station houses AU28. It is a resource that commonly gets dispatched by automatic aid across Area C during 2nd alarm or greater structure fires. The SCBA Program is also housed out of Fire Station 28. Several members are trained as SCBA technicians and perform repairs, maintenance, and fit testing on site.
Security : The property is not secured with either an access gate or wall/fence surrounding the property. The rear parking area can be accessed by the public through one of the two open driveways.
Community Space : There is no additional spaces for community interaction beyond the normal functions of a typical fire station. There is no dedicated front lobby or foyer for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system Backup Power: There is an on site diesel backup generator PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
APPARATUS BAY
Area: 48’6” L x 31’1” W
Stalls: 2 full length bays (one heavy apparatus in each stall, except a tiller truck) Access: Front and rear apparatus bay doors, but access is limited in the rear due to storage and a tight turning radius into the station from the rear. E28 drives through the back while AU28 backs into the apparatus bay from the front.
Assessment
• Apparatus f loor needs to have the cracks f illed, sealed, and painted • Walls need general repair and paint
• Additional ceiling lights need to be installed. Current lighting is poor in the app bay • Electric cord reels for apparatus charging need to be changed to higher amperage style • There are many exposed conduits that have been installed throughout the years and should be addressed properly
• There is an ice maker next to the apparatus. It should be relocated away from an area exposed to diesel engine exhaust.
• Two refrigerators are kept in the apparatus bay. They should be moved interior during a kitchen remodel, away from an area exposed to diesel engine exhaust • Floor drains should be installed Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
TURNOUT LOCKERS
Description: 12 open lockers in the apparatus bay used for storage of firefighting turnouts and additional PPE for 12 personnel.
Assessment
Lockers
• Lockers were installed as part of the last remodel and are in good condition • Doors should be installed for each locker. It would be ideal to fully enclose the lockers to keep diesel exhaust from being exposed to the PPE
• If doors are installed, ventilation system needs to be installed to evacuate off gassing or moisture in turnouts
PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
SHOP
Area: 9’9” L x 7’10” W
Description: The work shop includes a work bench, rolling tool box, air compressor, and shelves.
Assessment
• Shop was not addressed in the recent remodel
• Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • New work bench is needed, the current wood is worn, faded, and chipped • New cabinetry is needed, the current metal shelf is too small for current storage needs • Walls need general repair and repaint
• A proper ventilation system should be installed
• 240V outlet should be installed for future use
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the shop PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
OFFICE
Area: 10’1” L x 8’3” W
Description: The off ice contains 1 computer work station with access from the apparatus bay. There is no separate lobby for public interaction.
Assessment
• The Off ice was not addressed during the recent remodel and is in need of a complete upgrade
• Carpet is worn out and flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint. There is water damage on the block wall and it should be resealed prior to painting
• Electrical is def icient to support modern needs
• There is no insulation in the off ice therefore off ice temperature f luctuates greatly and current HVAC cannot keep up with demands
• Individual HVAC split system needs to be installed after proper insulation is addressed • The off ice needs triple pane windows with new window coverings for better room climate control along with increased station security and privacy • Ceiling needs to be insulated and covered with drywall with recessed can lights • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the off ice PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
CAPTAIN’S DORM
Area: 15’10” L x 10’4”
Description: Individual dorm with three individual lockers and one chair Assessment
• Captain’s dorm was partially renovated during the recent remodel • Windows, window covering, carpet, lockers are new and in good condition • Insulation was not addressed, so the dorm temperature f luctuates greatly and current HVAC cannot keep up with demands
• HVAC split system needs to be installed, similar to the other 3 dorms • Ceiling needs to be insulated and covered with drywall with recessed can lights • There is water damage on the block wall and it should be resealed prior to painting • There is a leak in the roof above the Captain’s Dorm
PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
BATHROOM (ADA)
Area: 10’3” L x 8’4” W
Description: Individual ADA
bathroom with one
toilet, one sink, and one shower
Assessment
• One of three newly remodeled bathrooms for Fire Station 28 BATHROOM (w/Step-In Shower)
Area: 12’3” L x 5’6” W
Description: Individual bathroom
with one toilet, one sink, and one
shower
Assessment
• One of three newly remodeled bathrooms for Fire Station 28
RESTROOM (No Shower)
Area: 6’10” L x 4’9” W
Description: Individual bathroom with
one toilet, and one sink
Assessment
• One of three newly remodeled bathrooms for Fire Station 28 PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
FIREFIGHTER DORM PLUS COMMON AREA
Area: Avg Dorm 10’ L x 9’8” W
Description: 3 individual dorms w/ a bed, 3 lockers, small desk, chair, & HVAC split system Assessment
• Newly renovated dorms
• Converted open dorm for 3 into 3 individual dorms with their own HVAC split system • Common area includes a desk and computer work station
BEDDING CLOSET
Area: L-Shaped 10’7” x 9’ x 4’7” x 4’4”
Description: Storage area mainly used for employees bedding Assessment
• Newly renovated storage area
• New shelves to store bedding for all employees
PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
KITCHEN & DINING AREA
Area: 13’7" L x 12’2” W
Description: Kitchen with dining table, 4
chairs, stove/oven, one refrigerator, one
microwave and 12 personal lockers
Assessment
• South side of the f ire station was not addressed in the recent renovation • There is a leak in the roof above the individual food lockers • Kitchen is in need of a full remodel
• Cabinetry is paint grade wood which is showing chipping, cracking, and breakage at the edges and drawer/door fronts
• Walls and ceiling need general repair and paint
• Storage space needs to be increased and made more eff icient. There is very little counter space for food prep and not enough space to store small appliances and kitchenware. • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the kitchen • A plan for new appliances needs to be established
• Window need to be replaced with a triple pane window with a new window covering • Square footage can be increased by expanding into the outdoor patio PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
PANTRY (OLD PHONE BOOTH)
Area: 4’2” L x 2’6” W
Description: Currently being used as a food
pantry and extra kitchenware storage area.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls and ceiling need general repair and paint after removing carpet • New cabinetry should be installed to maximize storage space • Additional lighting is need inside of the pantry
• This space can also be converted into additional kitchen space during a kitchen remodel to keep all kitchenware inside the kitchen and away from the apparatus bay PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
DAY ROOM
Area: 16’4” L x 13’7” W
Description: The Day Room includes TV,
and 4 chairs
Assessment
• South side of the f ire station was not addressed in the recent renovation • There is a leak in the roof above the day room
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the Day Room • Carpet is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls need general repair and paint
• The Day Room needs new triple pane windows with new window coverings for more efficient heating and cooling, along with better station security and privacy • Ceiling needs to be insulated and covered with drywall with recessed can lights • Insulation was not addressed, so the room temperature f luctuates greatly and current HVAC cannot keep up with demands
• Individual HVAC control panel or an HVAC split system needs to be installed PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
SCBA REPAIR ROOM
Area: 13’7” L x 8’1” W
Description: The SCBA Repair Room
includes a workbench and computer
work station along with storage for SCBA
maintenance supplies
Assessment
• South side of the f ire station was not addressed in the recent renovation • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the Day Room • The cabinetry is a appropriate for the current needs of repairing and maintaining SCBAs • The room should be reconf igured to make the space more ef ficient for the repair technicians.
• Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls need general repair and paint
• The Repair Room needs new triple pane windows with new window coverings for more efficient heating and cooling, along with better station security and privacy • Insulation was not addressed, so the dorm temperature f luctuates greatly and current HVAC cannot keep up with demands
• Individual HVAC control panel or an HVAC split system needs to be installed PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
GYM
Description: Detached shed recently converted into a gym Assessment
• This is a relatively recent remodel from a storage shed to gym facility and is in good condition
INTERIOR - GENERAL
Assessment
• HVAC system need to be evaluated and professionally cleaned • Non-Remodeled Area:
• Triple pane windows with new window coverings for more ef ficient heating and cooling, along with better station security and privacy • Flooring needs to be replaced with polished concrete or luxury vinyl plank • Vaulted ceilings need to be insulated and covered with drywall with recessed can lights
• Walls need general repair and paint
EXTERIOR - GENERAL
Assessment
• Fire Station 28 needs roof replacement. There are multiple leaks and rotting wood support members
• There are no security measures at FS28
• Rear parking area completely open to the public from the two driveways • Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting • There is a large amount of landscaping on the property due to the size of the lot. It is over grown and needs maintenance.
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
IMMEDIATE PRIORITIES
• Fire Station 28 needs roof replacement. There are multiple leaks and rotting wood support members
• Compete insulation and triple pane windows for the rest of the station that was not addressed during the recent remodel
• Specifically the rooms that are used frequently such as the Captain’s Dorm, Of fice, SCBA Repair Room, Kitchen, and Day Room
• Utilize the dirt lot to the rear of the station
• The open dirt lot is approximately 60’ x 60’
• The whole area to the rear of the parking area is 107’ from the north block wall to the Community Ave sidewalk and 67’ from the south driveway to the east property line • There is a need in the department to be able to store Reserve Engines and Ambulances indoors at different locations. This would be an ideal location to store one of each reserve apparatus plus a Utility Vehicle. This structure can also house the supplies and equipment for the SCBA Program to help clear space from the Apparatus Bay and SCBA Repair Room
PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
LONG TERM PRIORITIES
• Fire Station 28 is one of the oldest fire station in the GFD. It would be best suited to rebuild completely on the existing lot withstand future changes and increases in personnel or service to community.
• Fire Station 28 was constructed in the 1950s to initially house 4 personnel working on 1 apparatus. The community, population, call volume, and resources needed in Glendale has out grown this station.
• Update kitchen, dining area, and appliances
• Update Of fice
• Update the Day Room
• Utilize the lot square footage in the rear to build a structure that can store one or two Reserve Engines and one or two Reserve Ambulances
• Create a long term plan and timeframe on completely renovating the interior of the station to turn it into a “100 year station”
• This plan should include the ability to house 6 personnel to allow for growth • This would allow space for an additional resource in the future • 6 individual dorm rooms plus 3 individual bathrooms
• Larger kitchen & dinning area
PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 28
ROOF REHABILITATION PROPOSAL (2023)
PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
AME Builders, Inc.
1 of 1
Proposal v3.07 Glendale City-Wide Fire Station #28 Main Bldg..xlsx
PROPOSAL
1242 Transit Ave. BID NUMBER 221223G-01
Pomona, CA 91766 PREPARED BY Don Seo
CSLB. 1057266 EMAIL [email protected]
DIR. PW-LR-1000455020 PHONE (714) 719-4223
DGS. SB / SBPW # 2017898 DATE 1/18/2023
CUCP. DBE # 50620
LAC. LSBE # 090869
METRO. SBE # 9094
TO PROJECT NAME / LOCATION
City of Glendale Fire Station #28 Main Bldg.
For City-wide Roofing Maintenance and
Repair, Contract No. 8001571
4410 New York Ave.
Glendale, CA
WE HEREBY SUBMIT A PROPOSAL TO FURNISH AND INSTALL
The work is including, but not limited to:
Roof Rehabilitation - Coating System by GE
Power wash and clean entire roof
Area is approx. 5000 SF
Prepare curbs and seams with fabric and seam sealer
Install crickets between drains with 5000 Pond Buster compound Apply bleed blocker over entire roof area
Apply GE Enduris 3525 silicone roof coating over entire area Use building's restroom (Portable restroom is not included) 10 Year Product Warranty included
Add $2,500 for 10 Year Labor and Material Limited Warranty (This amount is not inlcuded in the below SOV) Estimated Schedule of Values
Line Items Rate Estimated Qty Amount
Material and Supplies 21,623.00
Material and Supplies mark-up 10% 2,162.30
Rental Equipment -
Rental Equipment mark-up 15% -
Apprentice Roofing Services 76.00 - -
Journeyman Roofing Services 118.52 252.00 29,867.04
Laborer Services 104.60 - -
OT Apprentice Roofing Services 102.07 - -
OT Journeyman Roofing Services 161.79 - -
OT Laborer Services 142.73 - -
Minimum Trip Charge 1,000.00 - -
Other Charges -
Estimated Total 53,652.34
EXCLUSIONS
Permit fees
Asbestos/LBP testing/abatement
Thank you so much for this opportunity.
GLENDALE FIRE DEPARTMENT FIRE STATION 28
SEISMIC ANALYSIS
PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 10 | Page
FIRE STATION #28 – 4410 NEW YORK AVE.
Built: 1 9 5 5
Area: 3 , 4 0 0
Stories: 1
Type: W1 – Wood frame
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Remove and replace existing roofing to provide access to install structural anchoring required
2. Remove and replace existing exterior stucco finish, lighting, electrical and other wall mounted items, to accommodate new shear wall framing and hold downs per structural report
3. Demo and replace gypsum ceilings at top of cementitious part itions to accommodate added bracing
4. Add flexible couplings to existing fluid, gas and fire suppression piping
5. Re-brace existing garage doors per structural requirements
6. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements, remove and replace T-bar ceilings as needed for access
7. Add safety devices to light fixture lens covers
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Add or replace existing roof sheeting with new plywood structural panels and adding of blocking at panel edges
2. Remove existing stucco wall finish, add new plywood structural panels and re-plaster
3. Add framing angles to top of shear walls and tie to blocking or rim joist with boundary nailing
4. Add shear wall holdowns with 4x end post
5. Add detailing to connections off the tops of cementitious partitions wall to roof structure
6. All non-structural components require lateral bracing and anchorage to building structure
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $873,908
SUPPORT SERVICES FACILITY ASSESSMENT 2023
FIRE STATION
29 GLENDALE FIRE DEPARTMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
PAGE 2 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
HONOLULU AVE.
SUNSET AVE.
E29
BLS29
FS29 DRIVEWAY
LIBRARY
ORANGDALE AVE.
T29
OES1317
LIBRARY
HONOLULU AVE.
SUNSET AVE.
T29
E29
BLS29
FS29
LIBRARY PARKING
LIBRARY PARKING
LIBRARY PARKING
GFD PARKING
LIBRARY PARKING
GLENDALE FIRE DEPARTMENT FIRE STATION 29
PAGE 3 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
29 5 min.
4 min.
3 min.
2 min.
1 min.
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Glendale Fire Department
Drive-Time Analysis
0 0.15 0.3 0.45 0.6 0.750.07
Miles
Fire Station 29
⭕
GLENDALE FIRE DEPARTMENT FIRE STATION 29
OVERVIEW
Address: 2465 Honolulu Ave. (Between Sunset Ave. & Orangedale Ave.) Ye ar Built: 19__
Story Height: 2 floors above ground, 1 floor below ground (storage only) Apparatus Bays: 3 stalls with separate apparatus bay doors. Front and rear access for the middle stall only (Truck 29). There is no rear access is for the other two stalls. Engine 29 and BLS 29 back into the fire station from Honolulu due to WT29 and OES1317 parked inside the apparatus bay.
Apparatus Assigned: Truck 29, Engine 29, and BLS 29 are staffed full time. OES 1317 and Water Tender 29 are also stored at Fire Station 29. The OES Type 3 engine is cross staffed with Truck 29 personnel on 1
st alarm brush assignments. WT29 is cross staffed with Engine 29 personnel which is dispatched by request throughout Area C. There is also a dedicated Utility vehicle labeled as RC29, Rescue Cushion 29, which staffed by Truck 29 when dispatched by request throughout Area C. There is no additional space for Reserve Apparatus or Ambulance.
Personnel Assigned : 10 total per shift. Two Captains, two Engineers, four Firefighter Paramedics, and 2 Ambulance Operators
• Max employees that can be housed per 24 hr shift : 10 total Location : Fire Station 29 is one of 3 key fire stations in Glendale. It is location is in northern Glendale, in the Montrose Shopping District. The district consists of single family residential, commercial retail, freeways, and wildland urban interface.
Building: Fire Station 29 is poured in place concrete structure with a concrete flat roof. The exterior also includes exposed red brick.
Special Uses: This fire station shares the lot with an attached Glendale public library.
Security : The property is not secured with either an access gate or wall/fence surrounding the property. The rear parking area can be accessed by the public through the open driveway or the rear library exit which leads to the library parking area.
Community Space : There is no additional spaces for community interaction beyond the normal functions of a typical fire station. There is a small unsecured foyer near the front door for public interaction.
Fire Suppression Systems : The fire station is equipped with a fire sprinkler system Backup Power: There is an on site diesel backup generator PAGE 4 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
APPARATUS BAY
Stalls: 3 bays. Each bay has enough space for either a Tiller Truck or an Engine plus a light vehicle.
Access: Separate apparatus bay doors in the front for each apparatus. Rear access for only the Tiller Truck. The Engine and Ambulance back in from the front due to parking for Water Tender 29 behind Engine 29 and OES1317 behind BLS 29.
Assessment
• Apparatus f loor needs to have the cracks f illed in, sealed, and painted • Walls need general repair and paint
• Additional ceiling lights need to be installed. Current lighting is poor in the app bay • Electric cord reels for apparatus charging need to be changed to higher amperage style • Floor drains should be installed
• New compressor rated at a higher capacity is needed to f ill apparatus tires • Two door leading to the fire station living quarters are not properly rated and do not contain proper seals or closing hardware to inhibit diesel exhaust from entering the locker • Long term plans need to include accordion or horizontal style app bay doors. The current style have proven unreliable and both diff icult and expensive to repair.
PAGE 5 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
SMALL ENGINE REPAIR ROOM
Area: 6’9” L x 6’4” W
Description: Room
used to clean, repair,
and maintain small
engine equipment
used on the front line
fire apparatus. This
room is accessed from
the Apparatus Bay only.
Assessment
• Workbench has become worn and should be upgraded
• Additional cabinetry is needed to better organize the room • Floor needs to have the cracks f illed in then be resealed and polished • Walls need general repair and paint
• Ventilation should be improved to reduce moisture in the room • Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the repair room PAGE 6 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
CAPTAIN’S OFFICE
Area:23’10” L x 11’1” W
Description: Off ice space with a total of 2
computer work stations. The Truck
Captain and Engine Captain share the
office. There is also a small bathroom in
the rear corner that includes a shower,
toilet, and sink.
Assessment
• The Off ice is in need of a full remodel, as it was not addressed in the past renovations • Carpet is worn out and flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint
• Electrical is def icient to support modern needs
• All windows should be replaced with triple pane window • New interior door, interior windows, and window coverings with improved seals for better climate control and privacy
• Door leading to the apparatus bay is not properly rated and does not contain proper seals or closing hardware to inhibit diesel exhaust from entering the off ice • New cabinetry to increase eff iciency in the space, so that a 3 rd work station can be added PAGE 7 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
FOYER / WATCHDESK
Description: This is the public entrance off of Honolulu Ave. This serves as the area of main interaction with the public. There is a computer work station typically used by Firef ighters and Ambulance Operators. There is also shelving under the old watch desk for misc admin items.
Assessment
• Move the work station into the off ice
• The public lobby is not secured from the rest of the f ire station. Once inside the lobby/ foyer, there is open access to the whole fire station
• Build a countertop near the front door to have better security and separation for public interaction
• Upgrade glass door and windows to triple pane and add window coverings for better climate control and station privacy (this includes the glass around the front stairwell) • Ceiling tiles & glue need to be scraped off, and placed with painted drywall (this includes the whole hallway behind the foyer)
• Carpet is worn out and flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
PAGE 8 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - UNDER STAIRS STORAGE CLOSET
Area: 11’9 L x 3’11” W
Description: Storage space for miscellaneous
station items
Assessment
• Walls need general repair and pain
• Floors need to be addressed by polishing the concrete • Lighting needs to be added for this space
• Ventilation should be added to reduce moisture in the room PAGE 9 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - PANTRY (OLD PHONE BOOTH)
Area: 4’7” L x 2’10” W
Description: Currently being used as a food pantry and extra kitchenware storage area.
Assessment
• Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the pantry • Flooring is worn and needs to be replaced with polished concrete or luxury vinyl plank • Walls and ceiling need general repair and paint after removing carpet • New cabinetry should be installed to maximize storage space • Additional lighting is need inside of the pantry
• Ventilation should be added to reduce moisture in the room PAGE 10 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - UTILITY CLOSET
Area: 4’8” L x 3’7” W
Description: Downstairs storage area with a mop sink
Assessment
• Shelves need to be upgraded to make the storage area more ef ficient • Additional lighting is need inside of the closet
• Add ventilation to reduce moisture in the room due to the mop sink • Flooring should be replaced with polished concrete or luxury vinyl plank • Walls and ceiling need general repair and paint
PAGE 11 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - HALLWAY BATHROOM
Area: 8’4” L X 5’9” W
Description: Downstairs unisex restroom with a toilet, urinal, and sink.
Assessment
• Bathroom is in need of a remodel to conform to current standards of gender equality and personal privacy
• May need to meet ADA standards since this is the closest bathroom to the front entrance • Short term improvements needed:
• Remove urinal and relocate toilet to meet ADA standards • Upgrade ventilation to reduce moisture in both the shower and sink areas • Update tile, sinks, mirror, lighting, and flooring
• Walls and ceiling need general repair and paint
PAGE 12 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - MECHANICAL ROOMS
Area:
South: 3’9” L x 1’10” W
North: 3’9” L x 1’9” W
Description: Fire Station 29’s electrical panels plus
storage for large item cleaning supplies are located
in these 2 closets accessed from the 1
st floor
hallway
Assessment
• Walls and ceiling need general repair and paint
• Lighting needs to be added for this space
• Ventilation should be added to reduce moisture and increase climate control in the room • Rooms should not be used for storage of cleaning supplies PAGE 13 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - SHOP
Area: 11’11 L x 8’11” W
Description: The workshop includes a work bench, rolling tool box, shelves, and refrigerator.
Assessment
• New workbench and cabinetry is needed, the current wood is worn, faded, and chipped • Cabinetry needs to be updated to maximize storage potential and ef ficiency • Floor needs to have the cracks f illed in, resealed, and painted • Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Lighting needs to be added to increase safety inside the Shop • Ventilation should be added to reduce moisture in the room • 240V outlet should be installed for future use
• Door leading to the apparatus bay in the hallway is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the station PAGE 14 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - EMS SUPPLY CLOSET
Area: 9’1” L x 7’5” W
Description: Storage area solely for EMS restock
equipment
Assessment
• Cabinetry needs to be updated to maximize storage potential and ef ficiency • Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• Lighting needs to be added for this space
• Ventilation should be added to reduce moisture in the room PAGE 15 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - PASSTHROUGH CLOSET
Area: 7’10” L x 6’10” W
Description: Storage area for miscellaneous items plus a large ice maker. The closet can be accessed through the Apparatus Bay or the 1 st floor hallway. Previous used as a turnout storage area then converted into USAR equipment storage when the USAR apparatus was assigned to Fire Station 29.
Assessment
• Cabinetry needs to be updated to maximize storage potential and ef ficiency • Floor needs to have the cracks f illed in, resealed, and painted or polished • Walls need general repair and paint
• Lighting needs to be added for this space
• Ventilation should be added to reduce moisture in the room • Upgrades would help utilize this space
PAGE 16 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
KITCHEN & DINING AREA
Description: Kitchen and dining area includes two refrigerator/freezer, stove/oven, two microwave, one sink, 24 food lockers, and a prep island Assessment
• Kitchen is in need of a full remodel
• There is very little counter space for food prep and not enough space to store small appliances and kitchenware
• Cabinetry is paint grade wood which is showing chipping, cracking, and breakage at the edges and drawer/door fronts
• Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Lighting needs to be upgraded
• Individual food lockers are showing wear and need to be updated • Sliding door and sliding screen door need to be replaced for triple pane • Window coverings need to be add for climate control and station privacy • Door leading to the apparatus bay is not properly rated, does not contain proper seals, or closing hardware to inhibit diesel exhaust from entering the kitchen • Appliances need to be upgraded
• New table and chairs for 10 personnel are needed
• Long term plan should be developed for a complete remodel as the countertop space and dining area are not adequate for the current 10 full time personnel PAGE 17 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
DAY ROOM
Area: 23’1” L x 14’3” W
Description: The Day
Room includes a large
dry erase board, TV,
and 8 chairs.
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas should be replaced with polished concrete or luxury vinyl plank • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Additional ceiling lights are needed
• Windows need to be replaced with triple pane windows and window coverings need to be upgraded
• A long term plan for chair replacement needs to be developed PAGE 18 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - BACK OFFICE (STUDY ROOM)
Area: 11’11 L x 9’8”
Description: Small
office with two
computer work
stations plus a TV and
shelving. Used as a
Captain’s dorm at the
time of this writing
due to water damage.
Assessment
• Carpet is worn and in need of replacement
• High traff ic areas should be replaced with polished concrete or luxury vinyl plank • Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Additional ceiling lights are needed
• Walls need general repair and paint
• New shelves and cabinetry is needed to turn this room into a proper study room • New off ice chairs and upgraded desktop to increase ergonomics PAGE 19 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - RESTROOM - ADA
Area: 7’2” L x 7’1” W
Description:
Downstairs individual
restroom (ADA) with a
toilet, sink, and
cabinetry
Assessment
• Restroom was updated more recently than the rest of the station • It is in fairly good condition
PAGE 20 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - BATHROOM - ADA
Area: 10’11” L x 7’1” W
Description: Downstairs individual bathroom (ADA) with a sink and shower Assessment
• Bathroom was updated more recently than the rest of the station • New triple pan privacy window is needed
PAGE 21 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - CAPTAINS DORMS
Description: Two individual dorms used by the Truck and Engine Captains Assessment
• Carpet is worn and in need of replacement
• High traff ic areas with carpet should be replaced with polished concrete or luxury vinyl plank
• Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Additional lighting is needed in the dorms
• Windows need to be replaced with triple pane
• New window coverings are needed
• Metal lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage • New off ice desk and chair for each Captains dorm
• Higher rated door to help block the noise from the gym area • Individual HVAC controls or an HVAC split system needs to be installed PAGE 22 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
1st FLOOR - GYM AND LAUNDRY AREA
Description:
Assessment
• Walls need general repair and paint
• Drop ceiling tiles should be replaced as the current ones are damaged and discolored • Additional lighting is needed in the gym
• Windows need to be replaced with triple pane
• New window coverings are needed
• Door to separate the gym from the laundry room is needed • Additional ventilation for both rooms to reduce moisture • HVAC split system needs to be installed in the gym so it can be used year round PAGE 23 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
2nd FLOOR - UPSTAIRS COMMON BATHROOM
Restroom Area Total: 14’2 L x 106” W
Shower Area Total: 10’7” L x 9’1” W
Description: This shared common bathroom includes 4
sinks, 3 toilets, 2, urinals, and 3 showers. The common bathroom includes 2 entrances, one from the hallway
and one from the open locker room
Assessment
• Bathroom is in need of a remodel to conform to current standards of gender equality and personal privacy
• When a single employee uses this bathroom, he or she needs to lock two doors to obtain privacy
• The recommendation for this space is for it to be remodeled and split into three individual bathrooms, each with its own shower, sink, toilet, and changing area • Short term improvements needed:
• Replace urinal with a toilet and install full height partitions for personal privacy • Create two separate entrances to the double shower. The curtain to separate the two spaces is not adequate
• Upgrade ventilation to reduce moisture in both the shower and sink areas • Update tile, sinks, mirror, and lighting
• One window need to be replaced with a privacy glass triple pane window PAGE 24 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
2nd FLOOR - LOCKER ROOM (Shared/Open)
Area: 19’1” L x 8’ W
Description: Shared open
locker room area with 26
individual lockers
Assessment
• The locker room does not allow for personal privacy or gender neutrality • The recommendation is to combine the locker room and dorms into one area filled with individual dorms that include lockers for each employee • Short term improvements needed:
• Carpet is worn out. Flooring should be replaced with polished concrete or luxury vinyl plank in high traff ic areas of the f ire station
• Walls need general repair and paint
• Ceiling tiles & glue need to be scraped off, and replaced with painted drywall • Additional ceiling lights are needed
• Windows and window coverings need to be regraded with triple pane windows • Lockers should be replaced with a larger version designed speci fically for the needs of 48 hour personnel including linen storage, toiletries, uniforms, and boot storage PAGE 25 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
2nd FLOOR - DORMS (Open)
Area: Total space 34’6” L x 24’ W
Description: Open shared dorm area for 8 employees. Dorms are separated by 7 foot tall partitions that do not go all the way up to the ceiling.
Assessment
• This is an open shared dorm space for 8 employees
• The dorm doesn’t allow for personal privacy or gender neutrality with half height partitions • This space along with the locker room is large enough to split into 8 separate individual dorm rooms with lockers
• HVAC split system w/ individual controls OR individual controls for every dorm if one HVAC system
• Carpet is worn and needs to be replaced
• Windows need to be replaced with triple pane windows and new coverings are needed • Walls and drop ceiling need general repair and paint
PAGE 26 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
2nd FLOOR - BEDDING CLOSET
Area: 5’7” L x 3’8” W
Description: Storage for employees bedding since the
lockers in the locker room do not afford enough space
Assessment
• Cabinetry needs to be updated to maximize storage potential and ef ficiency • Lighting needs to be added for this space
• Ventilation should be added to reduce moisture in the room • Flooring should be replaced with polished concrete or luxury vinyl plank • Walls need general repair and paint
PAGE 27 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
2nd FLOOR - CLEANING CLOSET
Area: 3’8” L x 3’1” W
Description: Storage closet mainly used for cleaning supplies Assessment
• Cabinetry needs to be updated to maximize storage potential and ef ficiency • Additional lighting is need inside of the closet
• Ventilation should be added to reduce moisture in the room • Flooring should be replaced with polished concrete or luxury vinyl plank • Walls need general repair and paint
• Ventilation should be improved to reduce moisture in the room • Lighting needs to be added for this space
PAGE 28 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
2nd FLOOR - UTILITY CLOSETS
Area:
11’8” L x 6’7” W
6’7” L x 5’11” W
6’7” L x 3’5” W
Description:
Assessment
• All 3 spaces need a major remodel
• Neither of the spaces are being utilized except for the mop sink • Recommendation is to assess the space to convert into:
• One individual bathroom with shower, sink, toilet, and changing area • One individual restroom with a sink and toilet
• One of each
PAGE 29 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
INTERIOR - GENERAL
Assessment
• Ventilation system needs to be evaluated and have the duct work professionally cleaned • All windows should be replaced with triple pane for better noise reduction and climate control eff iciency
• All flooring should be replaced
• High traff ic areas need to be evaluated for polished concrete or luxury vinyl plank options • Walls need general repair and paint
• All stained and broken drop ceiling tiles need to be replaced •
• Mattresses should be replaced, they are past their life expectancy • Complete all open FSRs
PAGE 30 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
EXTERIOR - GENERAL
Assessment
• Roof needs to be evaluated for leaks
• Additional station security is needed, such as camera’s around property, parking area, and front entrance, along with better exterior lighting
• Rear parking area completely open to the public due to sharing the lot with the library, a gate should be installed to access the f ire station driveway PAGE 31 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
IMMEDIATE PRIORITIES
• Fire Station 29 needs to have the flat roof evaluated for leaks, as there have been leaks the past few winters
• All windows should be replaced with triple pane plus new window coverings for better noise reduction, climate control eff iciency, and station privacy • Address the upstairs shared open bathroom, locker room, and partitioned dorms • Recommendation: Completely gut the upstairs so that proper individual dorms and bathrooms can be constructed
• Current open bathroom space can be converted into 3 separate, individual bathrooms
• The three unused closets accessed from the hallway can be converted into additional restrooms or bathrooms as well
• The open locker room and dorms can be converted into 8 individual dorms with full height walls and individual HVAC controls
• Long term planning: Utilize the unused space above the apparatus bay and poorly used so that additional individual dorms with HVAC split systems & cabinetry and additional individual bathrooms can be built.
• Mattresses should be replaced, they are past their life expectancy • Carpet throughout the station is worn and new flooring needs to be addressed PAGE 32 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
LONG TERM PRIORITIES
• Fire Station 29 is one of the oldest fire stations in the GFD. It would be best suited to completely gut the inside of the structure and rebuild completely on the existing lot to withstand future changes and increases in personnel or service to community. • Fire Station 29 was constructed in the 1950s to initially house 8 personnel working on 2 apparatus. The community, population, call volume, and resources needed in Glendale has out grown this station.
• If the opportunity to take over the library arises, the fire department needs to make a remodel at Fire Station 29 a high priority. This would allow the fire department to expand its capabilities.
• Fire Station 29 is one of three key stations that require a company to move up from another agency if a large incident occurs within Glendale • One of three Truck stations
• Take over the public parking lot to the rear of the station • This can free up parking spaces for GFD employees and city vehicles • Create a long term plan and timeframe on completely renovating the station on its current lot, to turn it into a “100 year station”
• This plan should include the ability to house 14 personnel to allow for growth • This would allow space for an additional resource in the future • 14 individual dorm rooms plus 4 individual bathrooms
• Utilize area above apparatus bay for dorms or bathrooms • Larger kitchen & dinning area
• A 3rd story to include a community space for the public or classroom for the personnel
• Space to store reserve apparatus
PAGE 33 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE DEPARTMENT FIRE STATION 29
SEISMIC ANALYSIS
PAGE 34 SUPPORT SERVICES DIVISION FACILITY ASSESSMENT
GLENDALE FIRE STATIONS 21 – 29
PROPERTY SEISMIC INSPECTIONS AND ANALYSIS
E 11 | Page
FIRE STATION #29 – 2465 HONOLULU AVE.
Built: 1 9 6 1
Area: 3 , 7 0 0
Stories: 2
Type: C2 - Concrete
Architectural Analysis and Recommendations (See detailed Architectural Report - Exhibit A)
1. Demolish portion of Library concrete roof to allow 6” separation of buildings
2. Demo and replace gypsum ceilings at top of cementitious partitions to accommodate added bracing
3. Add flexible couplings to existing fluid, gas and fire suppression piping
4. Re-brace existing garage doors per structural requirements
5. Brace all high cabinets, equipment, ceiling systems and overhead utilizes per structural requirements, remove and replace T-bar ceilings as needed for access
6. Add safety devices to light fixture lens covers
Structural Engineer Analysis and Recommendations (See detailed Structural Report - Exhibit B)
1. Demolition of portion of library roof to create require separation
2. Add connections at top of cementitious partition walls to roof structure
3. All non-structural components require lateral bracing and anchorage to building structure
Construction Estimated Costs
Arco Construction budget estimate per Wheeler and Gray scope plans $492,463