ORDINANCE NO.

AN ORDINANCE OF THE COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA AMENDING ORDINANCE NO. 6016 ESTABLISHING THE ELECTRIC RATES FOR GLENDALE WATER & POWER FOR FISCAL YEARS 2024 TO 2027 TO ADD THE

STANDBY SERVICE RIDER FOR MEDIUM BUSINESS DISPATCHABLE AND THE

STANDBY SERVICE RIDER FOR LARGE BUSINESS DISPATCHABLE RATES WHEREAS, the City of Glendale, through the Glendale Water & Power Department ("GWP"), operates a municipal utility for the distribution of electrical energy to the residents of the City of Glendale; and
WHEREAS, the last increase to the electric rates was implemented by GWP in 2018; and
WHEREAS, on November 14, 2023, GWP presented the City Council with proposed electric rates for Fiscal Years 2024 through 2027; and WHEREAS, on November 28, 2023 the Glendale City Council adopted Ordinance No. 6016 implementing electric rates which took effect on January 1, 2024; and
WHEREAS, although the Cost Of Service Analysis (COSA) included, and considered as part of the proposed rates, four specific rates providing a unique Standby Service Rider option for standard Medium LD-2 and Large Business PC- 1 including Time-of-Use (TOU) customers, during the implementation of the new electric rates it was noted that new rates for the Standby Service - Medium Business Dispatchable and Standby Service - Large Business Dispatchable were not included in the rate tables attached to Ordinance No. 6016; and WHEREAS, historically GWP has not had any customers on the standard Standby Service Medium Business dispatchable LD-2 and the Standby Service Large Business Dispatchable PC-1 rates; however, there are expected to be a small group of such customers utilizing the unique rates and services beginning in 2024 as explained in the Report dated March 26, 2024 to the City Council, and as such these rates were considered and included in the COSA; and WHEREAS, GWP is also proposing some additional edits to the Standby Service Rider which would provide needed benefits and cost savings to the customer through a monthly peak demand instead of a ratcheted 12 month peak demand and proposing extending the standby service rider to the Medium Business Dispatchable and Large Business Dispatchable TOU LD2B and PC1B rates, which were not included in the adopted COSA and omitted from Ordinance No. 6016, to allow the co-generation customers the option to be on a standard or 1 TOU standby service rider and benefit from the monthly peak demand and the annual saving it may provide; and
WHEREAS, the City Council has considered the reports and testimony of staff and the comments of the public regarding the same; and WHEREAS, the COSA and proposed rate plan reflect previously approved law and legislative direction of the present and former City Councils including: (i) the requirements of Article XI, Section 22 of the Glendale City Charter, which was approved by the voters in 1949 and has remained in the City Charter since that date; and (ii) the Public Benefits Charge set forth in Section 13.44.425 of the Glendale Municipal Code, which was first approved in 1997 as required by state law and subsequently amended in 1998, 1999, 2001, 2006 and 2008 and has remained in the Glendale Municipal Code, 1995 ("GMC") without change since 2008; and
WHEREAS, the proposed electric service rates and charges, as set forth in Ordinance 6106 and as amended by this Ordinance, have been calculated on the basis of the reasonable costs incurred by GWP to provide electric service to GWP's customers; and
WHEREAS, the proposed electric service rates and charges constitute charges imposed for one or more of the following reasons: (1) a specific City benefit conferred or privilege granted (California Constitution, Article XIIIC, §1 (e) (1)) and/or (2) a City service or product (California Constitution, Article XIIIC, 81 (e) (2)).

NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE
CITY OF GLENDALE:

SECTION 1. Notice of public meetings at which this Ordinance was considered was properly given, and all oral and written presentations made to and heard by the City Council were properly considered.

SECTION 2. There is a reasonable relationship between the rates to be charged for the provision of various City services and the City's costs in providing those services.

SECTION 3. The amended Electric Rates attached hereto as Exhibit "1":
a) Do not exceed the actual or estimated reasonable costs to the City for providing the services to which the fees related; b) Are reasonable and necessary to enable the City to provide the benefit or privilege, service or product to which they related; and 2 c) Have been allocated in a manner such that the costs to the payor bear a fair and reasonable relationship to the payor's burden on, or benefits received, from the City.

SECTION 4. Since 2006, the City's electric rates have included a lawful tax equal to 9.42 percent of the electric utility's costs of service. The electric rates approved through this Ordinance temporarily decrease that tax to 7.60 percent.

This temporary decrease shall expire on June 30, 2028.

SECTION 5. Compliance with California Environmental Quality Act.

The City Council tinds and determines that this Ordinance is not subject to the California Environmental Quality Act ("CEQA"). Pursuant to CEQA Guidelines Section 15273, CEQA does not apply to the establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, and other charges by public agency which the public agency finds are for the purpose of (1) meeting operating expenses including employee wage rates and fringe benefits, (2) purchasing or leasing supplies equipment or materials, (4) meeting financial reserve needs and requirements, for obtaining funds for capital projects necessary to maintain service within existing service areas, or (5) obtaining funds necessary to maintain such intra-city transfers are authorized by City Charter. As set forth in the Report Dated March 26, 2024 by the General Manager of GWP the electric rate increases which were approved via Ordinance No. 6106 and those which are being recommended for approval are for the express purposes of meeting existing operating expenses of GWP, purchasing supplies, equipment or materials necessary to operate the utility, funding certain capital improvements necessary to supply electricity to the residents and businesses within Glendale's service area, and to ensure the Glendale City Charter authorized intra-city transfer can be maintained.

SECTION 6. The City Council hereby adopts the amendments proposed herein and the electric rate schedule as set forth in Exhibit "1", attached hereto and incorporated herein by reference.

SECTION 7. Severability. This Ordinance is adopted under the authority of the Charter of the city of Glendale and State law. If any section, subsection, clause or phrase is declared invalid or otherwise void by a court of competent jurisdiction, it shall not affect any remaining provision hereof. In this regard the City Council finds and declares that it would have adopted this measure notwithstanding any partial invalidity hereof.

SECTION 8. Effective Date. This Ordinance shall take effect and be in force thirty (30) days after the date of its passage.

Passed by the Council of the City of Glendale on the _ day of _ 2024.
-
Mayor
ATTEST:

City Clerk

STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS.

CITY OF GLENDALE
1, Suzie Abajian Ph.D., City Clerk of the city of Glendale, certify that the foregoing Ordinance No. _ was passed by a majority vote of the Council of the city of Glendale, California, at a regular meeting held on the day of , 2024, and that the same was passed by the followed vote.

Ayes:

Noes:

Absent:

Abstain:

City Clerk
4 EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:

Residential Service L-1-A
Item Unit Current Rate Proposed Rates
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1, 2024 sul 1, 2025 Jul 1, 2026 Jul 1, 2027 Customer Meter/Day $0.64 $0.70 $0.75 $0.75 $0.75 $0.75
Energy KWh
High Season - First 10 kWh/day $0.1661 $0.2481 $0.2863 $0.3335 $0.3335 $0.3335 High Season - Next 10 kWh/day $0.2059 $0.3075 $0.3549 $0.4134 $0.4134 $0.4134 High Season - Remaining kWh $0.2459 $0.3673 $0.4238 $0.4937 $0.4937 $0.4937 Low Season - First 10 kWh/day $0.1393 $0.2081 $0.2401 $0.2797 $0.2797 $0.2797 Low Season - Next 10 kWh/day $0.1725 $0.2577 $0.2973 $0.3464 $0.3464 $0.3464 Low Season - Remaining kWh $0.2128 $0.3179 $0.3668 $0.4273 $0.4273 $0.4273 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note: These rates also apply to Residential Solar (L-1-D).

High Season are months July, August, September, October Low Season are months November through June
Current and Proposed Electric Rates:

Residential Service L-1-B
Item Unit Current Rate Proposed Rates
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1, 2024 Jul 1, 2025 Jul 1, 2026 Jul 1, 2027 Customer Meter/Day $0.82 $0.70 $0.75 $0.75 $0.75 $0.75
Energy kWh
High Season - Base SO.1227 $O.1870 $0.2141 $0.2456 $0.2456 $0.2456 High Season - Peak $0.3681 $0.5610 $0.6423 $0.7368 $0.7368 $0.7368 Low Season - Base $0.1023 $O.1559 $0.1785 $0.2048 $0.2048 $0.2048 Low Season - Peak $0.3068 $0.4676 $0.5353 $0.6141 $0.6141 $0.6141 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note: These rates also apply to Residential Solar TOU (L-2-E).

High Season are months July, August, September, October low Seasonare months November throuch Junc
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates: Small Business L-2-A Item Unit Current Proposed Rates
Rate Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, Jul 1, 2024 Jul 1, 2025 Jul 1, 2026 Jul 1, 2027
2023
Customer Meter/Day $0.62 $0.80 $1.00 $1.25 $1.25 $1.25
Energy kWh
High Season $0.1841 $0.2674 $0.2993 $0.3312 $0.3312 $0.3312 Low Season $0.1595 $0.2317 $0.2593 $0.2869 $0.2869 $0.2869 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note: These rates also apply to Small Business Solar (L-2-C).

High Season are months July, August, September, Octobe
Low Season are months November through Jur
Current and Proposed Electric Rates:

Small Business L-2-B
item Unit Current Proposed Rates
Rate Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, Jul 1, 2024 sul 1, 2025 Jul 1, 2026 Jul 1, 2027
2023
Customer Meter/Day $1.33 $0.80 $1.00 $1.25 $1.25 51.25
Energy KWh
High Season - Base $0.1040 $0.1681 $0.1899 $0.2126 $0.2126 $0.2126 High Season -Peak $0.3119 $0.5041 $0.5695 $0.6376 $0.6376 $0.6376 Low Season - Base $0.0800 $0.1293 $0.1461 $0.1635 $0.1635 $0.1635 Low Season -Peak $0.2399 $0.3878 $0.4380 $0.4904 $0.4904 $0.4904 ECAC Kwh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Current and Proposed Electric Rates:

Medium Business LD-2-A
Item Unit Current Rate Proposed Rates
Phase 1, Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 sul 1, 2024 Jul 1, 2025 Sul 1, 2026 Jul 1, 2027 Customer Meter/Day $1.00 $1.25 '$1.50 $1.70 $1.70 $1.70 Energy kWh
High Season $0.0847 $0.1441 $O.1583 $0.1707 $0.1707 $0.1707 Low Season $0.0810 $0.1378 $0.1514 $0.1632 $0.1632 $0.1632 Demand KW
High Season $0.99 $1.04 $1.08 $1.15 $1.15 $1.15
Low Season $0.69 $0.72 $0.75 $0.80 $0.80 $0.80
ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note These rates a spy to Medium lies Solar 102,67, kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 High Season are months July, August, September, October Low Season are months November through June
EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:

Standby Service Rider: Medium Business Dispatchable
Proposed Rates
Item Unit Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1, 2024 Jul 1,2025 | Jul 1, 2026 | Jul 1, 2027 Customer Meter/Day $1.00 $1.25 $1.50 $1.70 $1.70 $1.70
Reservation Charge kW/day $0.54 $0.54 $0.54 $0.54 $0.54 $0.54 Supplemental Service Charge
Energy High Season kWh $0.0847 $0.1441 $0.1583 $0.1707 $0.1707 $0.1707 Energy Low Season kWh $0.0810 $0.1378 $0.1514 $0.1632 $0.1632 $0.1632 Demand High Season kW/day $0.99 $1.04 $1.08 $1.15 $1.15 $1.15 Demand Low Season kW/day $0.69 $0.72 $0.75 $0.80 $0.80 $0.80 Backup Service Charge
Energy Charge kWh See LD-2-A See LD-2-A See LD-2-A| See LD-2-A | See LD-2-A | See LD-2-A Demand High Season KW/day $0.45 $0.50 $0.54 $0.61 $0.61 $0.61 Demand Low Season KW/day $0.15 $0.18 $0.21 $0.26 $0.26 $0.26 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC KWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note:

1. Customer charge is applied to each meter installed for Standby Service.

2. Reservation Charge is a monthly charge applied to the contracted amount of standby capacity, typically aligned with generation capacity (KW) of the customer-owned generation resource.

3. Supplemental Service Charge is only applicable to the portion of power and energy required by and delivered to the customer ir excess of the customer self-generation. This charge aligns with the standard LD-2-A charges except as noted for demand charges.

4. Demand rates are determined by the maximum demand reading in the prior billing period (e.g., month)

5. Backup Service Charge is applicable during an unscheduled outage of the customer-owned generation resource and applied to the demand and energy consumption typically served by the customer-owned generation.

The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and

13.44.280 of the Glendale Municipal Code.

The PBC applies to all charges per Section

13.44.425 of the GMC.

The UUT applies to all charges per Section 4.36.030 of the GMC Current and Proposed Electric Rates:

Medium Business LD-2-B
Item Unit Current Rate Proposed Rates
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1, 2024 Jul 1, 2025 Jul 1, 2026 Jul 1, 2027 Customer Meter/Day $1.11 $1.25 $1.50 $1.70 $1.70 $1.70
Energy kWh
High Season - Base $0.0823 $0.1268 $0.1374 $0.1479 $0.14797 $0.1479 High Season - Peak $0.2423 $0.3733 $0.4045 $0.4354 $0.4354 $0.4354 Low Season - Base $0.0823 $0.1268 $0.1374 $0.1479 $0.1479 $0.1479 Low Season - Peak $0.1455 $0.2242 $0.2429 $0.2615 $0.2615 $0.2615 Demand
High Season $0.58 $0.61 $0.63 $0.67 $0.67 $0.67
Low Season $0.48 $0.50 $0.52 $0.55 $0.55 $0.55
ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note: These rates also apply to Medium Business Solar TOU (LD-2-D).

High Season are months July, August, September, October Low Season are months November through June
EXHIBIT 1
Electric Rate Tables
Proposed Electric Rates:

Standby Service Rider: Medium Business Dispatchable Time Of Use (TOU) Proposed Rates
Item Unit Current Phase 1
Rate Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1, 2024 Jul 1, 2025 Jul 1, 2026 Jul 1, 2027 Customer Meter/Day $1.11 $1.25 $1.50 $1.70 $1.70 $1.70
Reservation Charge kW/day $0.54 $0.54 $0.54 $0.54 $0.54 $0.54 Supplemental Service Charge
Energy KWh
High Season - Base $0.0823 $0.1268 $0.1374 $0.1479 $0.1479 $0.1479 High Season - Peak $0.2423 $0.3733 $0.4045 $0.4354 $0.4354 $0.4354 Low Season - Base $0.0823 $0.1268 $0.1374 $0.1479 $0.1479 $0.1479 Low Season - Peak $0.1455 $0.2242 $0.2429 $0.2615 $0.2615 $0.2615 Demand kW/day
High Season $0.58 $0.61 $0.63 $0.67 $0.67 $0.67
Low Season $0.48 $0.50 $0.52 $0.55 $0.55 $0.55
Backup Service Charge
Energy Charge KWh See LD-2-B See LD-2-B See LD-2-B See LD-2-B See LD-2-B See LD-2-B Demand High Season /W/day $0.45 $0.50 $0.54 $0.61 $0.61 $0.61 Demand Low Season /W/day $0.15 $0.18 $0.21 $0.26 $0.26 $0.26 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC KWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note:

1. Customer charge is applied to each meter installed for Standby Service.

2. Reservation Charge is a monthly charge applied to the contracted amount of standby capacity, typically aligned with generation capacity KW) ofthe customer-owned generation resource.

Supplemental Service Charge is only applicable to the potion of power and energy required by and delivered to the customer in excess of the customerself generatio his charge aligns with the standard TOU LD-2-B charges except as noted for demand charge

4. Demand rates are determined by the maximum demand reading in the current billing period (e.g., month

5. Backup Service Charge is applicable during an unscheduled outage of the customer-owned generation resource and applied to the demand and energy consumption typically served by the customer-owned generation.

The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and 13.44.280 of the Glendale Municipal Code.

The PBC applies to all charges per Section 13.44.425 of the GMC.

The UUT applies to all charges per Section 4.36.030 of the GMC EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:

Medium Business PC-1-A
Item Unit Proposed Rates
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1,2024 Jul 1, 2025 Jul 1, 2026 Jul 1, 2027 Customer Meter/Day $5.82 $7.00 $9.00 $10.50 $10.50 $10.50 Energy kWh
High Season $0.0695 $0.1345 $0.1513 $0.1698 $0.1698 $0.1698 Low Season $0.0628 $0.1215 $0.1367 $0.1534 $0.1534 $0.1534 Demand KW
High Season $1.19 $1.25 $1.32 $1.40 $1.40 $1.40
Low Season $0.90 $0.95 $1.00 $1.06 $1.06 $1.06
Reactive Power KVAR $0.004 $0.006 $0.008 $0.010 $0.010 $0.010 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 KWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000
$0.0000 $0.0000 $0.0000 $0.0000 $0.0000
Note: These rates ako aply to Large Busines Solar PC 100159 Lois Season are months Neve mugust, sember, October
Current and Proposed Electric Rates:

Standby Service Rider: Large Business Dispatchable
Proposed Rates
Unit Current Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Item Rate
Dec 1, 2023 Jul 1, 2024 sul 1, 2025 sul 1, 2026 sul 1, 2027 Customer Meter/Day $5.82 $7.00 $9.00 $10.50 $10.50 $10.50 Reservation Charge kW/day $0.64 $0.64 $0.64 $0.64 $0.64 $0.64 Supplemental Service
Charge
Energy High Season kWh $0.0695 $0.1345 $0.1513 $0.1698 $0.1698 $0.1698 Energy Low Season kWh $0.0628 $0.1215 $0.1367 $0.1534 $O.1534 $0.1534 Demand High Season kW/day $1.19 $1.25 $1.32 $1.40 $1.40 $1.40 Demand Low Season KW/day $0.90 $0.95 $1.00 $1.06 $1.06 $1.06 Reactive Power Charge kVAR/Day $0.004 $0.006 $0.008 $0.010 $0.010 $0.010 Backup Service Charge
Energy Charge kWh See PC-1-A See PC-1-A See PC-1-A See PC-1-A See PC-1-A See PC-1-A Demand High Season kW/day $0.55 $0.61 $0.68 $0.76 $0.76 $0.76 Demand Low Season kW/day $0.26 $0.31 $0.36 $0.42 $0.42 $0.42 Reactive Power Charge KVAR/Day See PC-1-A See PC-1-A See PC-1-A See PC-1-A See PC-1-A See PC-1-A

1. Customer charge is applied to each meter installed for Standby Service.

2. Reservation Charge is a monthly charge applied to the contracted amount of standby capacity, typically aligned with generation capacity (kW) of the customer-

3. Supplemental Service Charge is only applicable to the portion of power and energy required by and delivered to the customer in excess of the customer self- eneration. This charge aligns with the standard PC-1-A charges except as noted for demand charge . Demand rates are determined by the maximum demand reading in the current billing period (e.g., month

5. Backup Service Charge is applicable during an unscheduled outage of the customer-owned generation resource and applied to the demand and energy consumption typically served by the customer-owned generation.

The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and 13.44.280 ofthe Glendale Municipal Code.

The PBC applies to all charges per Section 13.44.425 of the GMC.

The UUT applies to all charges per Section 4.36.030 of the GMC EXHIBIT 1
Electric Rate Tables
Current and Proposed Electric Rates:

Large Business PC-1-B
Item Unit Current Rate Proposed Rates
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Dec 1, 2023 Jul 1, 2024 sul 1, 2025 Jul 1, 2026 sul 1, 2027 Customer Meter/Day $5.82 $7.00 $9.00 $10.50 $10.50 $10.50 Energy kWh
High Season - Base $0.0714 $0.1194 $0.1322 $0.1463 $0.1463 $0.1463 High Season -Peak $0.2008 $0.3358 $0.3718 $0.4114 $0.4114 $0.4114 Low Season - Base $0.0714 $0.1194 $0.1322 $0.1463 $0.1463 $0.1463 Low Season -Peak $0.1163 $0.1945 $0.2153 $0.2383 $0.2383 $0.2383 Demand
High Season $0.82 $0.86 $0.91 $0.96 $0.96 $0.96
Low Season $0.58 $0.61 $0.64 $0.68 $0.68 $0.68
Reactive Power KVAR $0.004 $0.006 $0.008 $0.010 $0.010 $0.010 ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000
$0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000
High Season are months July, August, September, October Low Season are months November through June
Proposed Electric Rates:

Standby Service Rider: Large Business Dispatchable Time of Use (TOU) Proposed Rates
Item Unit Current Rate Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Dec 1, 2023 sul 1, 2024 Jul 1, 2025 Jul 1, 2026 sul 1, 2027 Customer Meter/Day $7.00 $9.00 $10.50 $10.50 $10.50
Reservation Charge kW/day $0.64 $0.64 $0.64 $0.64 $0.64 Supplemental Service Charge
Energy kWh
High Season - Base $0.0714 $0.1194 $0.1322 $0.1463 $0.1463 $0.1463 High Season - Peak $0.2008 $0.3358 $0.3718 $0.4114 $0.4114 $0.4114 ow Season - Base $0.0714 $0.1194 $0.1322 $0.1463 $0.1463 $0.1463 Low Season - Peak $0.1163 $0.1945 $0.2153 $0.2383 $0.2383 $0.2383 Demand KW/day
High Season $0.82 $0.86 $0.91 $0.96 $0.96 $0.96
Low Season $0.58 $0.61 $0.64 $0.68 $0.68 $0.68
Reactive Power KVAR/Day $0.004 $0.006 $0.008 $0.010 $0.010 $0.010 Backup Service Charge
Energy Charge kWh See PC-1-B See PC-1-B See PC-1-B See PC-1-B See PC-1-B See PC-1-B Demand High Season kW/day $0.55 $0.61 $0.68 $0.76 $0.76 $0.76 Demand Low Season kW/day $0.26 $0.31 $0.36 $0.42 $0.42 $0.42 Reactive Power Charge KVAR/Day See PC-1-B See PC-1-B See PC-1-B See PC-1-B See PC-1-B See PC-1-B ECAC kWh $0.0001 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RAC kWh $0.0250 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 RDC kWh $0.0159 $0.0000 $0.0000 $0.0000 $0.0000 $0.0000 Note:

1. Customer charge is applied to each meter installed for Standby Service.

2. Reservation Charge is a monthly charge applied to the contracted amount of standby capacity, typically aligned with generation capacity (kW) of the customer-owned generation resource.

3. Supplemental Service Charge is only applicable to the portion of power and energy required by and delivered to the customer in excess of the customer self-generation. This charge aligns with the standard PC-1-B charges except as noted for demand charges.

4. Demand rates are determined by the maximum demand reading in the current billing period (e.g., month)

5. Backup Service Charge is applicable during an unscheduled outage of the customer-owned generation resource and applied to the demand and energy consumption typically served by the customer-owned generation.

The ECAC, RAC, RDC will be calculated and applied per Sections 13.44.260, 13.44.270, and 13.44.280 of the Glendale Municipal Code.

The PBC applies to all charges per Section 13.44.425 of the GMC The UUT applies to all charges per Section 4.36.030 of the GMC