CITY OF GLENDALE, CALIFORNIA
REPORT TO THE CITY COUNCIL
AGENDA ITEM
Report: Contract Award to General Pump Company for the Verdugo Metro Booster Pump and Motor No. 3 Repair Project, Specification No. 4009.
1. Motion authorizing the City Manager, or his designee, to enter into and execute a contract with General Pump Company (General Pump), for the Verdugo Metro Booster Pump and Motor No. 3 Repair Project, Specification No. 4009, in the amount of $68,404 plus a ten percent (10%) contingency of $6,840
COUNCIL ACTION
Item Type: Consent Calendar
Approved for May 6, 2025 calendar
EXECUTIVE SUMMARY
Metro Pump No. 3 had been experiencing vibration issues. In June 2024, Glendale Water and Power (GWP) had two consultants visit the pump station for an assessment on the pump and motor. After receiving bids from both contractors, GWP selected one and had the pump and motor removed for inspection and diagnosis. The pump and motor are now ready for repair and reinstallation.
GWP staff solicited bids for the pump and motor repair and found General Pump to be the lowest responsive bidder. The recommended contract with General Pump would cost $68,404.00 with a 10% contingency of $6,840, totaling $75,244.
RECOMMENDATION
Authorize the City Manager to enter into and execute a contract with General Pump for the Verdugo Metro Booster Pump and Motor No. 3 Repair Project in the amount of $68,404, plus a ten percent contingency of $6,840.
ANALYSIS
The James Rez Pump Station, also known as Verdugo Metro Pump Station, pumps potable water from the City’s Metropolitan Water District (MWD) G-1 connection to the 968 pressure zone and to the Glorietta Reservoir. The Station consists of four Metro pumps, two Verdugo pumps, and two turbine generators. Metro Pumps Nos. 3 and 4 were installed in 1983, are identical, and each sized at 4,000 gallons per minute.
Metro Pump No. 3 had been experiencing vibration issues, as observed by our Operations staff. In June 2024, GWP had two consultants visit the pump station for an assessment on the pump and motor. After receiving proposals from both consultants, {{Item.Tracking_Number}}2{{section.number}}a
5 9
4 9
GWP selected one and moved forward with removal of the pump and motor for inspection and diagnosis. The pump and motor are now ready for repair, followed by reinstallation.
On February 11, 2025, the City Council approved Resolution No. 25-17 to adopt Specification No. 4009 for the project and directed the City Clerk to advertise for bids.
The Notice Inviting Bids (NIB) was published in the Glendale Independent newspaper on February 17, 2025, and February 20, 2025. The Bid was also advertised on Bidnet Direct, a public contracts advertising company. Bidnet Direct advertises to a wide range of contractors, firms, and other public agencies, and allows for coordination and communication between those entities and the advertising agency, GWP. The NIB was also posted to the City’s website.
On March 5, 2025, GWP utilized a “Mandatory Pre-Bid Meeting” to further ensure clear communication with a committed, informed proposer pool. There were eight attendees that represented six contractor/companies at the meeting. On March 19, 2025, the bid deadline,the City received two bids for the project under Specification No. 4009.
Staff evaluated the two submissions based on price, experience, project approach, schedule and quality of response. The two responsive bids are tabulated below.
Proposer Proposal Amount
General Pump Company $68,404
Layne Christensen Company $103,535
Upon review of the bid documents, GWP staff found General Pump Company to be the lowest responsive bidder. Their bid amount of $68,404 is 15% below the higher range of the Engineer’s Estimate of $75,000 to $80,000. General Pump’s bid has been checked for completeness and found to be in compliance with the bidding requirements.
Staff recommends a reserve of ten percent or $6,840 for contingencies for this project.
This amount is based on previous experience and is commensurate with the nature of the project. This will allow GWP to account for any incidental work or unforeseen field conditions that could be encountered during construction and the resulting field changes.
Staff has verified with the State of California Contractor’s License Board that General Pump Company has a license that is current, active and in good standing.
STAKEHOLDERS/OUTREACH
Not applicable.
FISCAL IMPACT
The recommended contract with General Pump would cost $68,404 plus a ten percent contingency of $6,840, totaling $75,244, which is available in the budget as follows:
Amount Account String Funding Source
$75,244 GL: 52100-5930-GWP-0020-P0000 Water Depreciation Fund {{Item.Tracking_Number}}3{{section.number}}a
5 9
4 9
PL: GWP01376AN
ENVIRONMENTAL REVIEW (CEQA/NEPA)
This project is categorically Exempt under the provisions of the California Environmental Quality Act (CEQA) pursuant to the California Code of Regulations, Title 14, Sections 15301 and 15302, repair, maintenance, or minor alterations of existing utility facilities, and replacement or reconstruction of existing utility systems or facilities.
CAMPAIGN DISCLOSURE
Not applicable.
ALTERNATIVES TO STAFF RECOMMENDATION
Alternative 1: Choose not to award the contract as recommended herein. This will result in postponement of the repair and installation of Metro Booster Pump and Motor No. 3.
Alternative 2: Consider any other alternative not proposed by staff.
ADMINISTRATIVE ACTION
Submitted by:
Scott K. Mellon, P.E., Acting General Manager - Glendale Water and Power Prepared by:
Chisom Obegolu, Assistant General Manager - Water
Approved by:
Roubik R. Golanian, P.E., City Manager