Cities Index.
Agenda packet

Glendale City Council
September 9, 2025

Document
Agenda packet
Meeting
September 9, 2025
Body
Glendale City Council
Pages
6
Original file
185.5 MB
Text extracted from the city's file for reading and search. Open the original on glendaleca.primegov.com. That file is the official record.

A G E N D A

GLENDALE CITY COUNCIL

COUNCIL CHAMBERS
613 E. Broadway, 2nd Floor
Glendale, CA 91206

PUBLIC PARTICIPATION AND ACCESSIBILITY

PLEASE SILENCE CELLULAR PHONES WHILE INSIDE THE MEETING LOCATION Viewing of City Council Meetings: • In-person – City Council Chambers, 613 E. Broadway, 2nd Floor, Glendale, CA 91206 • Live Broadcast via Glendale TV, viewable on Spectrum Cable, channel 6, and AT&T U-verse, channel 99. Meetings are also streamed on the City webpage, glendaleca.gov/live, on YouTube.com/myglendale, and on the Cablecast app under "Glendale TV". Meetings are also archived on the City Website for viewing anytime at glendaleca.gov/agendas.

City Council meeting agenda packets, any agenda related documents, and additional documents are available at City Hall and online for public viewing on the City’s website:
https://www.glendaleca.gov/government/public-meeting-portal ADA Accessibility and Translation Services:

In compliance with the Americans with Disabilities Act (ADA) of 1990, auxiliary hearing aids, sign language translation, and Braille transcripts are available upon request. Assisted listening devices are available same-day upon request. The City Clerk’ office should be notified 72 hours (three business days) or as soon as practicable for requests regarding sign language translation and Braille transcription services; please direct all accessibility requests to (818) 548-2090. For translations, please specify the language for which you require translation. The exclusive use of City provided interpreters is not required and persons are welcome to use their own interpreter or speak in their native language.

Public participation in Council meetings may occur as follows:
• In-person – City Council Chambers • Telephonic participation: Call (818) 937-8100 If you have any questions about matters on the agenda, or requests for assistance including agenda email notification, please contact the City Clerk’s Office via email at [email protected], or by phone at (818) 548-2090. 1 TYPED 9/5/2025 3:09:28 PM
09 09 25
CC

PUBLIC COMMENT GUIDELINES
The City Council welcomes public input at City Council meetings. Public input at Council meetings is regulated by the City Council’s Rules of Order, Procedure and Decorum for the Conduct of City Council Meetings as set forth in Resolution No. 25-76, which will be summarized below.

Written Comments and Documents:

Public comments received in writing will NOT be read aloud at the meeting but will be part of the meeting record. Written public comments can be emailed to [email protected], and will be uploaded to the City website as an attachment to the agenda item. When submitting a public comment, please make sure to include the following:

1. Name (optional); and

2. Agenda item to which you are submitting public comment

3. Submit no later than 12:00 p.m. on the day of the City Council meeting. Correspondence received after this time may not be distributed until the following business day.

All documents related to open session items on this agenda that are received less than 72 hours prior to this meeting, and are public records, will be available for review in the Office of the City Clerk, 613 E. Broadway, Room 110, Glendale, CA 91206.

Public Comments During Council Meeting:

Public Comments during Community Event Announcements, First and Second Periods of Oral Communications and agenda items will be governed as provided in the descriptions for those items on the agenda below. Pursuant to State law, the City Council may not discuss or take action on any item not appearing on the meeting agenda, except that members of the City Council or staff may ask a question for clarification or briefly respond to statements made or questions posed by persons exercising public testimony rights (Government Code Section 54954.2). Staff may be asked to follow up on such items.

Submitting Speaker Cards or Calling In for Public Comment:

Speaker cards must be submitted and telephonic participants must call in and be in the call-in queue as follows: • Community Event Announcements or First or Second Period of Oral Communications: PRIOR TO the commencement of the specific comment period
• Consent Calendar Items: BEFORE a motion is made on the consent calendar • Other agenda items, including Action items: PRIOR to the completion of the verbal staff report (unless waived by the Mayor)
Any audio-visual files displayed by speakers must be emailed to the Clerk’s office by 12:00 pm on the day before a Council meeting.
2 TYPED 9/5/2025 3:09:28 PM
09 09 25
CC
SEPTEMBER 9, 2025
Revised
Changed time for Closed Session
Added item 13a

ROLL CALL

1. CLOSED SESSION – 1:00 PM (To Commence at 3:00 PM)
a. Conference with Legal Counsel – Anticipated Litigation. Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Government Code Section 54956.9:

One Potential Case
b. Public Employment – Attorneys
c. Conference with Legal Counsel – Existing Litigation: Central BWB LLC v. City of Glendale et al., L.A.S.C. Case No. 25STCP01018; Central BWB LLC v. City of Glendale et al., L.A.S.C. Case No. 25STCP01144
d. Conference with Legal Counsel – Anticipated Litigation. Significant exposure to litigation pursuant to subdivisions (d)(2) and (e)(3) of Government Code Section 54956.9: Two Potential Cases
e. Conference with Real Property Negotiators: City-designated negotiators: Roubik Golanian, John Takhtalian, Michael J. Garcia, Gillian van Muyden, Bradley Calvert, Onnig Bulanikian and Mark Berry. Property Location: 309 Orange Street. Negotiating Parties: MGP XII Glendale Central LLC, an affiliate of Merlone Geier Partners.

Instructions to the negotiator(s) will concern the price and terms of payment for the acquisition of property
f. Conference with Labor Negotiators. The City-designated negotiators attending the closed session are: Roubik Golanian, John Takhtalian, Michael J. Garcia, Gillian van Muyden, Paula Adams, Peter Brown, Jack Liang, and Scott Mellon. The name of the employee organizations is: I.B.E.W., Local 18

2. REGULAR BUSINESS AGENDA – 6:00 PM
Roll Call
a. Flag Salute: Council Member
b. Invocation: Worshipful Vram Martirosyan, Glendale Masonic Lodge No. 368 c. Report of the City Clerk, re: Posting of Agenda. The Agenda for the September 9, 2025 Regular Meeting of the Glendale City Council was Posted on September 5, 2025 on the Bulletin Board Outside City Hall.

3. PRESENTATIONS AND APPOINTMENTS
a. Proclamation declaring September as Suicide Prevention Month

4. CONSENT ITEMS (Including Minutes)
The following are routine and may be acted upon by one motion. Any Member of Council or the audience requesting separate consideration may do so by making such request before motion is proposed.
3 TYPED 9/5/2025 3:09:28 PM
09 09 25
CC
a. City Clerk, re: Minutes of the Special City Council Meeting of August 26, 2025 and City Council Meeting of August 26, 2025
b. Public Works, re: Authorization for the City Clerk to Set the Time, Date, and Place of a Public Hearing for the Conditional Vacation of a Portion of the First Alley Easterly of Central Avenue, Southerly of California Avenue, Westerly of Orange Street (Alley 239) for the proposed 236 N. Central Avenue Project, Vacation Case No. 192V

1. Motion Authorizing the City Clerk to Set a Public Hearing for the Subject Alley Vacation
c. Finance, re: Designation of Authorized Representatives for FEMA and Cal OES Disaster Assistance

1. Resolution to designate City Manager, Director of Finance, and Assistant Director of Finance as authorized representatives to apply and obtain disaster assistance from FEMA and Cal OES when major disasters strike
d. Community Services and Parks, re: Acceptance of Federal Workforce Innovation and Opportunity Act funds from the State of California, Employment Development Department and award of contracts to the Glendale Youth Alliance and the City of Burbank

1. Accepting the Federal Workforce Innovation and Opportunity Act (WIOA) funds in the amount of $848,928 from the State of California, Employment Development Department; and authorizing the City Manager, or a designee, to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding

2. Authorizing the City Manager, or a designee, to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $703,428 from the WIOA federal grant for the period of July 1, 2025 to June 30, 2026

3. Authorizing the City Manager, or a designee, to enter into and execute a Contract with City of Burbank in an amount not to exceed $145,500 from the WIOA federal grant for the period of July 1, 2025 to June 30, 2026
e. Community Services and Parks, re: Acceptance of Youth@Work funds from the Los Angeles County, Department of Economic Opportunity and award of contract to Glendale Youth Alliance

1. Accepting the Youth@Work funds from the Los Angeles County, Department of Economic Opportunity in the amount of $353,100; and authorizing the City Manager, or a designee, to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding, subject to the approval by the City Attorney

2. Authorizing the City Manager, or a designee, to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $326,618 from the Youth@Work grant for the period of July 1, 2025 to June 30, 2026, subject to the approval by the City Attorney, subject to the approval by the City Attorney f. Public Works, re: Amend Professional Services Agreement (PSA) for Preparation of Design and Construction Documents for Fremont Park Renovation Project

1. Motion authorizing an amendment to PSA No. C106224 with David Volz Design Landscaping Architects, increasing the contract amount by $35,000 for a total not-toexceed amount of $1,333,214

5. CITY COUNCIL/STAFF COMMENTS (Including reports from conferences and regional meetings)
4 TYPED 9/5/2025 3:09:28 PM
09 09 25
CC

6. COMMUNITY EVENT ANNOUNCEMENTS (3-minutes per speaker) Members of the public will be permitted to announce upcoming events taking place in the community.

7. FIRST PERIOD OF ORAL COMMUNICATIONS (Maximum 3 minutes per speaker, 30- minute aggregate speaking time limit)
Members of the public may address the Council on agenda items or non-agenda items within the City Council’s subject matter jurisdiction. If a speaker addresses the Council on an agenda item during the First Period of Oral Communications, they may not speak again when the agenda item is called. A speaker who addresses the Council on non-agenda items during the First Period of Oral Communications may not speak during the Second Period of Oral Communications.

8. ADOPTION OF ORDINANCES
a. Management Services, re: Local Amendments to the California Building and Energy Code to require projects in single-family homes, duplexes and townhomes involving replacement or alteration (but not repair) of an existing air conditioning system or installation of new air conditioning systems to either include a heat pump space conditioner as the primary heating system, or install specific energy efficiency measures in addition to a new air conditioner

1. Motion Directing Staff to Include Provisions in the Local Amendments to the 2025 California Building and Energy Code to Be Considered by the Council in the Fall of 2025 That Would Require Energy Conservation Measures for Air Conditioner Alterations, Replacements and Installations in Existing Single-Family Homes, Duplexes and Townhomes

2. An Ordinance of the Council of the City of Glendale, California Amending the 2022 Glendale Building and Safety Code, Volume IX (Green Building Standards), to Require Energy Conservation Measures for Air Conditioner Alterations, Replacements and Installations in Existing Single-Family Residential Buildings

9. ACTION ITEMS
a. City Attorney, re: Ordinance Amending Glendale Municipal Code provisions regarding meetings, powers and duties of the Commission on the Status of Women (Moved from August 26, 2025, Council Meeting)

1. Introduction of Ordinance Amending Sections 2.38.090 and 2.38.140 of the Glendale Municipal Code, 1995 – Relating to the Commission on the Status of Women b. Management Services, re: Programs or Partnerships to Address Health and Social Challenges Affecting Men

1. Motion Directing Staf
c. Glendale Water and Power, re: Key Considerations and Refinements to the Clean Energy Programs Plan Funded by Public Benefit Charge and Low Carbon Fuel Standard for Fiscal Years 25-26 and 26-27 (Moved from August 26, 2025, Council Meeting)

1. Resolution authorizing Glendale Water & Power (GWP) staff to implement programs consistent with the outlined refinements to the Glendale Water and Power Clean Energy Programs Plan funded by Public Benefit Charge (PBC) and Low Carbon Fuel Standard (LCFS) for Fiscal Years (FY) 25-26 and FY 26-27 5 TYPED 9/5/2025 3:09:28 PM
09 09 25
CC

2. Resolution of Appropriation requesting $200,000 for the vehicle-to-everything (V2X) study supporting a potential pilot program
d. Public Works, re: Dispensing with Competitive Bidding and Awarding a Contract for Operation and Maintenance of the City’s Schneider Electric Building Management Systems and Software including EcoStruxure and StruxureWare Building Operations / Andover Continuum (Andover)

1. Resolution dispensing with competitive bidding and authorizing the City Manager or a designee to execute a contract with Schneider Electric Buildings Americas, Inc., (Schneider Electric) for the operation and maintenance of the city’s Andover Building Management Systems for 5 years in an amount not to exceed $825,000

10. HEARINGS
a. Community Development, re: Appeal of Design Review Board’s approval of DRB Case No. PDR-004219-2024 located at 906 Whitehaven Terrace to add an 1,865 square-foot (SF) two-story addition and change the architectural style of the existing 1,938 SF single-story single-family residence with an attached 3-car garage constructed in 1973 on a 11,770 SF interior lot in the R1R-III (Restricted Residential Zone, Floor Area District III).

1. Motion to Sustain Design Review Board’s Decision to Approve the Project with Conditions of Approval

2. Motion to Continue the Matter, Directing the City Attorney to Draft Findings Reversing the Design Review Board’s Decision and Denying the Project

11. REPORTS - INFORMATION

12. WRITTEN COMMUNICATIONS

13. DISCUSSION OF COUNCILMEMBER FUTURE AGENDA REQUESTS
a. Councilmember Gharpetian’s Request for a Report on the North Hollywood to Pasadena Bus Rapid Transit (BRT) Project

14. SECOND PERIOD OF ORAL COMMUNICATIONS
Discussion is limited to items NOT a part of this agenda. Each speaker is allowed 5 minutes.

Council may question or respond to the speaker, but there will be no debate or decision. The City Manager may refer the matter to the appropriate department for investigation and report.

15. NEW BUSINESS

16. ADJOURNMENT
6 TYPED 9/5/2025 3:09:28 PM
09 09 25
CC

M I N U T E S
SPECIAL MEETING: GLENDALE CITY COUNCIL

COUNCIL CHAMBERS
613 E. Broadway, 2nd Floor
Glendale, CA 91206
AUGUST 26, 2025
The Special Public Meeting of the Glendale City Council convened in the City Chambers, in said City, at 2:16 PM, on the above date, pursuant to a call for such meeting signed by the City Clerk of the City Council, and on file with the City Clerk, a copy of which is as follows:

August 21, 2025
Date
Written Notice of said meeting was given, which Notice consisted of a copy of the foregoing Call, and was served on each Member of the Council not joining in the Call, and upon the in said City not less than 24 hours before the time fixed in said Call for said meeting, as follows:

Upon Elen Asatryan at 5:00 PM August 21, 2025 Glendale, CA Upon Dan Brotman at 5:00 PM August 21, 2025 Glendale, CA Upon Vartan Gharpetian at 5:00 PM August 21, 2025 Glendale, CA Upon Ardy Kassakhian at 5:00 PM August 21, 2025 Glendale, CA Upon Ara Najarian at 5:00 PM August 21, 2025 Glendale, CA Mayor Najarian called the meeting to order at 2:16 PM.

ROLL CALL – 2:16 PM
- Present: Asatryan, Brotman, Gharpetian, Najarian
- Absent: Kassakhian
- Report of the City Clerk of the City Council, re: Posting of Agenda. The Agenda for the Tuesday, August 26, 2025 Special Public Meeting of the City Council was posted on August 21, 2025 on the Bulletin Board Outside City Hall.

A SPECIAL PUBLIC MEETING of the City Council is hereby called to meet at 2:00 PM on Tuesday, August 26, 2025, in the Council Chamber, 613 E. Broadway, 2nd Floor, Glendale, CA 91206 to consider the following item(s) of business, to wit;

1. Fire Department, re: Fire Department, re: Verdugo Fire Communications Center – Moetivations Inc., 911 Emergency CallTaker Supplemental Staffing Coverage, Dispense with Competitive Bidding
Staff Comments:

Roubik Golanian, City Manager
Jeff Brooks, Glendale Fire Chief
Public Speakers:

Beth Brooks

1. Resolution [25-123] authorizing the City Manager, or designee, to 7 of 348
dispense with competitive bidding and execute a contract between the City of Glendale and Moetivations, Inc., in the amount not to exceed $585,231 with a contingency of $58,523 for a total amount of
$643,754 to provide 911 emergency call-taking personnel.

2. Resolution [25-124] of Appropriation
Moved: Brotman Seconded: Asatryan
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Najarian
Noes: None

Absent: Kassakhian
Abstain: None

2. Community Services and Parks, re: Adams Square Mini Park and Mayors Bicentennial Park Playground Replacement
Projects
Staff Comments:

Roubik Golanian, City Manager
Presentation:

Onnig Bulanikian, Director of Community Services & Parks Mitchell Fink, KOMPAN Inc.

Public Speakers:

Beth Brooks

1. Motion to approve the final design for the Adams Mini Park playground and Mayors Bicentennial Park playground

2. Resolution [25-125] to:
a) Dispense with competitive bidding for the purchase of playground equipment and authorizing the Deputy Director of Finance – Purchasing or a designee to execute a Purchase Order/Service Agreement with KOMPAN Inc. for the Adams Square Mini Park Playground
Replacement Project in the amount of $487,441.20, plus a 5% contingency of $24,372.06, for a total amount not to exceed $511,813.26
b) Dispense with competitive bidding for the purchase of playground equipment and authorizing the Deputy Director of Finance – Purchasing or a designee to execute a Purchase Order/Service Agreement with KOMPAN Inc. for the Mayors Bicentennial Park Playground Replacement Project in the amount of $667,702.15, plus a 5% contingency of $33,385.11, for a total amount not to exceed $701,087.26

3. Resolution [25-126] of Appropriation to:
a) Appropriate $44,536.08 from LA County Regional Park and Open Space District Measure A Funds to the Adams Mini Park Playground Replacement Project to cover costs associated with the purchase and installation of playground equipment and accompanying site 8 of 348
improvements
b) Appropriate $227,208.15 from LA County Regional Park and Open Space District Measure A Funds to the Mayors Bicentennial Park Playground Replacement Project to cover costs associated with the purchase and installation of playground equipment and accompanying site improvements
Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Najarian
Noes: None

Absent: Kassakhian
Abstain: None
ADJOURNMENT – 3:03 PM
Moved: Brotman Seconded: Asatryan
Mayor of the City of Glendale
City Clerk of the City of Glendale
9 of 348

M I N U T E S

GLENDALE CITY COUNCIL

COUNCIL CHAMBERS
613 E. Broadway, 2nd Floor Glendale, CA 91206
AUGUST 26, 2025
Updates to Closed Session:
• Added Item I
• Item E has been Amended to add a potential case
Added Item 3b

ROLL CALL

1. CLOSED SESSION – 3:04 PM – Absent: Kassakhian
a. Conference with Legal Counsel – Anticipated Litigation. Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Government Code Section 54956.9:

One Potential Case
b. Public Employment – Attorneys
c. Conference with Legal Counsel – Existing Litigation: Central BWB LLC v.

City of Glendale et al., L.A.S.C. Case No. 25STCP01018; Central BWB LLC v. City of Glendale et al., L.A.S.C. Case No. 25STCP01144 d. Conference with Legal Counsel – Existing Litigation: Subro Claims o/b/o Geico Ins. a/s/o Lala Asadorian, Claim No. 25-0006
e. Conference with Legal Counsel – Anticipated Litigation. Significant exposure to litigation pursuant to subdivisions (d)(2) and (e)(3) of Government Code Section 54956.9: Two Potential Cases
f. Public Employee Performance Evaluation – City Manager g. Conference with Real Property Negotiators: City-designated negotiators:

Roubik Golanian, John Takhtalian, Michael J. Garcia, Gillian van Muyden, Bradley Calvert, Onnig Bulanikian and Mark Berry. Property Location: 309 Orange Street. Negotiating Parties: MGP XII Glendale Central LLC, an affiliate of Merlone Geier Partners. Instructions to the negotiator(s) will concern the price and terms of payment for the acquisition of property h. Conference with Real Property Negotiators: City-designated negotiators:

Roubik Golanian, John Takhtalian, Michael J. Garcia, Gillian van Muyden, Jeff Brooks and Mark Berry. Property Location: 1000 N. Brand Blvd.

Negotiating Parties: 1000 N. Brand LLC. Instructions to the negotiator(s) will concern the price and terms of payment for the acquisition of property i. Conference with Real Property Negotiators: City-designated negotiator:

Bradley Calvert. Negotiating Party: Events at Eden. Property: 1401 N.

Verdugo Road. Instructions to the negotiator(s) will concern the price and terms of payment for the lease of City-owned property
Closed Session item 1f was pulled from the agenda.

City Attorney Michael Garcia stated the Council anticipates reporting out on item 1d.
10 of 348
The Council recessed to Closed Session at 3:05 PM.

2. REGULAR BUSINESS AGENDA – 6:08 PM
Roll Call – All Present
a. Flag Salute: Mayor Ara Najarian
b. Invocation: Delivered by Dr. Suzie Abajian, Glendale City Clerk c. Report of the City Clerk, re: Posting of Agenda. The Agenda for the August 26, 2025, Regular Meeting of the Glendale City Council was Posted on August 22, 2025, on the Bulletin Board Outside City Hall.

3. PRESENTATIONS AND APPOINTMENTS
a. Proclamation declaring August 26, 2025, as Women’s Equality Day Carmen Arom, Vice-Chair of the Commission on the Status of Women Dalia Lomeli, YWCA of Glendale and Pasadena
Public Speakers:

Mike Mohill
b. Legislative Update by U.S. Representative Laura Friedman

4. CONSENT ITEMS (Including Minutes)
The following are routine and may be acted upon by one motion. Any Member of Council or the audience requesting separate consideration may do so by making such request before motion is proposed.
a. City Clerk, re: Minutes of the Regular City Council Meeting of August 19, 2025 Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None
b. Public Works, re: The Shoseian Tea House Rehabilitation Project

1. Resolution [25-127] adopting the Specification for the Shoseian Tea House Rehabilitation Project, Specification No. 4024; and directing the City Clerk to advertise for bids
Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None
11 of 348
c. Fire Department, re: Additional funding from Hazard Mitigation Grant Program (HMGP) for Local Hazard Mitigation Plan (LHMP) update

1. Motion to authorize the City Manager to accept Hazard Mitigation Grant Program (HMGP) additional funds in the amount of $84,740, and to execute the necessary agreements, certifications, and other documents required to accept the grant funds

2. Approve Resolution [25-128] of Appropriation
Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None
d. Management Services, re: Audit Committee Annual Report and Internal Audit Work Plan

1. Motion to note and file Fiscal Year 2024-25 Audit Committee Annual Report for the period of July 1, 2024 to June 30, 2025

2. Motion to note and file Fiscal Year 2024-25 Internal Audit Work Plan Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None
e. Community Development, re: Submission of the Homeless Housing, Assistance, and Prevention (HHAP) Program Round 6 Grant Application

1. Motion to approve the submission of the Homeless Housing, Assistance, and Prevention (HHAP) Program Round 6 grant application to the California Department of Housing and Community Development (HCD) and authorize the City Manager or a designee to execute all agreements, certifications, and documents necessary to accept and implement the funding Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None
f. Human Resources, re: International Association of Fire Fighters (IAFF) Medical Expense Reimbursement Plan
12 of 348

1. Resolution [25-129] approving Fire Chief and City contributions to the IAFF Medical Expense Reimbursement Plan

2. Resolution [25-130] Providing for Supplementary Benefits and Compensation of Certain Officers and Executive Employees of the City of Glendale to Supplement the Classification and Compensation Resolution
Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None
g. Community Services and Parks, re: Verdugo Workforce Development Board’s Application Submission Request to be designated as the America’s Job Center of CaliforniaSM Operator for the Verdugo Workforce Development Area
Motion

1. Approving the submission of the Verdugo Workforce Development Board’s request to the Governor of California for approval to be the America’s Job Center of CaliforniaSM Operator for the Verdugo Workforce Development Area for four years beginning July 1, 2025, through June 30, 2029

2. Upon approval from the Governor of California for VWDB to be the America’s Job Center of CaliforniaSM Operator for the Verdugo Workforce Development Area for four years beginning July 1, 2025, through June 30, 2029, authorizing the City Manager, or a designee, to execute all agreements, amendments, certifications, and documents necessary to effectuate the America’s Job Center of CaliforniaSM Operator services, subject to the approval by the City Attorney
Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Kassakhian, Najarian Noes: None

Absent: None
Abstain: None

5. CITY COUNCIL/STAFF COMMENTS (Including reports from conferences and regional meetings)
Mayor Najarian commented on the Housing Element, stating that the proposed City-owned overlay zone is the best approach to protect the City from potential overreach by the State Legislature. He also asked Director of Community Development Bradley Calvert if the comment period for the Housing Element could be extended.

Director Calvert responded that the comment period can be extended. He also 13 of 348
noted that the Mobility Element will be released next week and shared that the State has encouraged the City to move forward with the Environmental Justice Element, while acknowledging the complexity of both the Housing and Mobility Elements.

Councilmember Asatryan stated that recent community meetings have shifted from gathering input to debunking myths regarding the Land Use Element.

While she expressed support for extending the comment period, she emphasized the need for a structured approach to dispelling misinformation while ensuring the City continues to gather meaningful community feedback.

Councilmember Kassakhian left the meeting at 6:54 PM.

Councilmember Brotman voiced agreement with Councilmember Asatryan’s comments.

Councilmember Gharpetian provided clarifications regarding prior Council votes on the Surplus Land Act, the General Plan Amendment, and traffic lane reductions. He stated his opposition to upzoning or rezoning the Verdugo Road and Montrose parking lots, as well as to removing traffic lanes on City streets in favor of bike lanes. He also shared additional concerns regarding traffic and bike lane configurations.

Councilmember Asatryan responded to Councilmember Gharpetian’s remarks about Council votes and also addressed the Council’s support letters for AB 91 and the direction provided to staff. She then announced the Second Annual Women’s Equality Day Celebration, scheduled for Wednesday, September 10, 2025, at 5:00 p.m. in the historic Alex Theatre Courtyard, highlighting the panelists and agenda. She thanked Elena Bolbolian and Annette Ghazarian for their work in organizing the event.

Director Calvert stated that there is currently no set date for the close of the Housing Element comment period, and that it will remain open indefinitely. He confirmed that the public will be provided at least 30 days’ notice before the period closes. Mayor Najarian encouraged the public to submit comments through the City’s website to ensure both Council and staff are aware of community concerns. Director Calvert added that residents may also request public or community meetings by reaching out directly.

Councilmember Brotman informed the Council that Councilmember Kassakhian had excused himself due to health issues. He recommended postponing the Glendale Water & Power and reach code items in hopes that Councilmember Kassakhian might return or call in, noting the time sensitivity of those items.

6. COMMUNITY EVENT ANNOUNCEMENTS (3-minutes per speaker) Members of the public will be permitted to announce upcoming events taking place in the community.

Jeff Laub, Young People’s Sacred Harp Singing

7. FIRST PERIOD OF ORAL COMMUNICATIONS (Maximum 3 minutes per speaker, 30- 14 of 348
minute aggregate speaking time limit)
Members of the public may address the Council on agenda items or non-agenda items within the City Council’s subject matter jurisdiction. If a speaker addresses the Council on an agenda item during the First Period of Oral Communications, they may not speak again when the agenda item is called. A speaker who addresses the Council on nonagenda items during the First Period of Oral Communications may not speak during the Second Period of Oral Communications.

Carlos Arce, on behalf of Senator Sasha Renée Pérez
Catherine Del Rosario, on behalf of Assembly Member Jessica Caloza Tony Passarella
Mike Mohill
Ceda Bandari
Ejmin Hakobian
Karriem Faithful
Dalia Lomeli
Catherine Yesayan
Kate Unger
George Solywas
Hans Johnson, on behalf of Los Angeles City Councilmember Adrin Nazarian Paul
Mayor Najarian called a recess at 7:46 PM. Council reconvened at 7:56 PM. Item 9a was read into the record next.

8. ADOPTION OF ORDINANCES
a. Management Services, re: Ordinance of the City of Glendale, California, Amending the Glendale Building and Safety Code Volume IX to Adopt Local Amendments to the 2022 Edition of the California Building and Energy Code to require projects in single-family homes, duplexes and townhomes involving replacement or alteration (but not repair) of an existing air conditioning system or installation of new air conditioning systems must either include a heat pump space conditioner as the primary heating system, or install specific energy efficiency measures in addition to a new air conditioner
Staff Comments:

Roubik Golanian, City Manager
David Jones, Sustainability Officer
Scott Mellon, General Manager, Glendale Water and Power Michael Garcia, City Attorney
Public Speakers:

Joseph Ramos
Kate Unger

1. Ordinance Amending the Glendale Building and Safety Code, Volume IX, to Adopt Local Amendments to the 2022 Edition of the California Building and Energy Code - Introduced by Councilmember Brotman on 8/19/2025. 15 of 348
Moved: Brotman Seconded: Asatryan
Vote as Follows:

Ayes: Asatryan, Brotman
Noes: Gharpetian, Najarian

Absent: Kassakhian
Abstain: None
Councilmember Brotman’s motion failed on a tie vote of 2-2. Item 8a will be placed on the agenda for reconsideration at the next City Council meeting on September 9, 2025.

City Manager Roubik Golanian asked that Council take 9d next. Item 9d was read into the record.

9. ACTION ITEMS
a. City Attorney, re: Ordinance Amending Glendale Municipal Code provisions regarding meetings, powers and duties of the Commission on the Status of Women (Moved from August 12, 2025, Council Meeting)
With no objection Council decided to move and continue item 9a to the City Council meeting of September 9, 2025 to be discussed by the full Council.

1. Introduction of Ordinance Amending Sections 2.38.090 and 2.38.140 of the Glendale Municipal Code, 1995 – Relating to the Commission on the Status of Women
Item 8a was read into the record next but without objection Council decided to take item 9e first. Item 9e was read into the record.
b. City Attorney, re: Glendale Municipal Code Amendment Pertaining to Selection of the Mayor
With no objection Council decided to move and continue item 9b to the City Council meeting of September 9, 2025 to be discussed by the full Council.

1. Introduction of Ordinance of the Council of the City of Glendale, California Amending Section 2.04.020 of the Glendale Municipal Code, 1995, Relating to the Mayoral Selection Process
c. Community Development, re: Consideration of Development Standards and Conditional Use Permit for Drive Through Restaurant Facilities Staff Comments:
16 of 348
Roubik Golanian, City Manager
Bradley Calvert, Director of Community Development
Erik Krause, Deputy Director of Community Development
Presentation:

Vista Ezzati, Principal Planner, Community Development Department Public Speakers:

Damian Sullivan
Mardy Graves
Alek Bartrosouf

1. Motion Providing Final Direction to Staff Regarding Development Standards and Procedures for Approving Developments with DriveThrough Operations Moved: Gharpetian Seconded: Asatryan
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Najarian
Noes: None

Absent: Kassakhian
Abstain: None
Councilmember Gharpetian stepped away at 9:54 PM and returned at 10:00 PM.

Councilmember Asatryan stepped away at 10:00 PM and returned at 10:03 PM. d. Public Works, re: Amendment to Contract for Proprietary Maintenance and Repairs of Mitsubishi Elevators at Police Building and Central Library

1. Resolution [25-131] dispensing with competitive bidding and authorizing the City Manager or a designee to execute an amendment to contract 8002359 with Mitsubishi Electric US, Inc. for the proprietary maintenance and repairs of Mitsubishi elevators at Police Building and Central Library adding the maintenance and repair of the elevator in the Police Building Parking Structure to the scope and increasing the contract amount by $50,000
Moved: Asatryan Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Najarian
Noes: None

Absent: Kassakhian
Abstain: None
Item 9c was read into the record and considered by Council next. 17 of 348
Mayor Najarian stepped away at 9:30 PM. Mayor Pro Tem Brotman took over the meeting.

Mayor Najarian returned during the presentation of item 9c. e. Glendale Water and Power, re: Key Considerations and Refinements to the Clean Energy Programs Plan Funded by Public Benefit Charge and Low Carbon Fuel Standard for Fiscal Years 25-26 and 26-27
Staff Comments:

Roubik Golanian, City Manager
Scott Mellon, General Manager of Glendale Water and Power Presentation:

Ruzan Soloyan, Clean Energy Officer - Power Management, Glendale Water and Power
Public Speakers:

Beth Brooks
Kate Unger

1. Resolution authorizing Glendale Water & Power (GWP) staff to implement programs consistent with the outlined refinements to the Glendale Water and Power Clean Energy Programs Plan funded by Public Benefit Charge (PBC) and Low Carbon Fuel Standard (LCFS) for Fiscal Years (FY) 25-26 and FY 26-27

2. Resolution of Appropriation requesting $200,000 for the vehicle-toeverything (V2X) study supporting a potential pilot program Moved: Brotman Seconded: Asatryan
Vote as Follows:

Ayes: Asatryan, Brotman
Noes: Gharpetian, Najarian

Absent: Kassakhian
Abstain: None
Councilmember Brotman’s motion failed on a tie vote of 2-2. Item 9e will be placed on the agenda for reconsideration at the next City Council meeting on September 9, 2025.

10. HEARINGS

11. REPORTS - INFORMATION

12. WRITTEN COMMUNICATIONS

13. DISCUSSION OF COUNCILMEMBER FUTURE AGENDA REQUESTS
18 of 348

14. SECOND PERIOD OF ORAL COMMUNICATIONS
Discussion is limited to items NOT a part of this agenda. Each speaker is allowed 5 minutes. Council may question or respond to the speaker, but there will be no debate or decision. The City Manager may refer the matter to the appropriate department for investigation and report.

Cameron Nadles
Malcolm Johnson
Beth Brooks

15. NEW BUSINESS
a. Councilmember Gharpetian moves that the Claim for Damages of Subro Claims, Inc. o/b/o Geico Insurance a/s/o Lala Asadorian (Claim No. 25-0006) be and hereby is approved for the total sum of $15,424.20. The Director of Finance is authorized to issue a warrant in said sum for delivery upon receipt of a properly executed Release.

Moved: Gharpetian Seconded: Brotman
Vote as Follows:

Ayes: Asatryan, Brotman, Gharpetian, Najarian
Noes: None

Absent: Kassakhian
Abstain: None

16. ADJOURNMENT – 10:45 PM
Moved: Brotman Seconded: Asatryan
Mayor of the City of Glendale
City Clerk of the City of Glendale
19 of 348
4b

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Authorization for the City Clerk to Set the Time, Date, and Place of a Public Hearing for the Conditional Vacation of a Portion of the First Alley Easterly of Central Avenue, Southerly of California Avenue, Westerly of Orange Street (Alley 239) for the proposed 236 N. Central Avenue Project, Vacation Case No. 192V

1. Motion Authorizing the City Clerk to Set a Public Hearing for the Subject Alley Vacation

COUNCIL ACTION
Item Type: Consent Item
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
This report requests Council’s authorization for the City Clerk to set a date for a public hearing to consider the conditional vacation of a portion of Alley 239 located south of California Avenue between Central Avenue and Orange Street to facilitate development of the 236 N. Central Avenue Project. The proposed project is an 8-story, 655,418 SF mixed-use building with 682 residential units (72 affordable). The vacation would allow the Project’s parking structure and amenity level deck to span through and across the alley.

RECOMMENDATION
Pass a motion authorizing the City Clerk to set a public hearing on October 21, 2025, for the subject alley vacation.

ANALYSIS
The Project site is 4.57 acres and includes two sites separated by California Avenue: (i) the 3.7-acre Mixed-Use Building Site bounded by California Avenue, Central Avenue, and Orange Street, and (ii) the 0.87-acre Potential Public Park Site located on the northwest corner of California Avenue and Orange Street.
20 of 348
2 4b
The Mixed-Use Building Site is bisected by Alley 239 and is developed with a three-story retail building formerly occupied by Sears (closed in March 2020), a three-level parking structure, and a small asphalt surface parking lot. The Project proposes to replace all existing improvements with a new 8-story, 655,418 SF mixed-use building on the MixedUse Building Site. The Project would include 682 residential units of which 72 units would be affordable to very low- and low-income households.

The developer has requested that the City process the vacation of the Subject Alley to accommodate redevelopment of the Mixed-Use Building Site. The vacation would allow the Project’s parking structure and amenity level deck to span through and across the alley.

Alley 239 is approximately 18 feet wide and 607.6 feet long, improved with asphaltic concrete pavement. It contains an 8-inch sanitary sewer mainline, an overhead power pole, and underground electrical conduit. The alley connects California Avenue at the north end to Wilson Avenue at the south.

The Applicant is proposing to vacate the northerly 403-foot portion of Alley 239. A new 20-foot-wide by 187-foot-long alley will be constructed at the Project’s southernmost property line running easterly and connecting to Orange Street. If the portion of Alley 239 is vacated, the underlying fee will revert to the fee owner of the Project site and will be incorporated into the Project. If the Project is not constructed, the alley will remain "as is" (conditional vacation).

All City departments, and various agencies and public utility companies have been notified of the proposed alley vacation and have advised the Public Works Department of their conditions or easements that may need to be reserved. This information will be included in a Resolution Ordering the Vacation to be considered at the public hearing.

On August 6, 2025, the Planning Commission reviewed the proposed vacation and recommended approval by passing a motion finding consistency with the applicable goals and objectives of the Comprehensive General Plan of the City.

City Clerk authorization is requested to set a date for a public hearing to consider the conditional vacation of a portion of Alley 239 located south of California Avenue between Central Avenue and Orange Street to facilitate the development of the 236 N. Central Avenue Project.

STAKEHOLDERS/OUTREACH
N/A

FISCAL IMPACT
There is no fiscal impact associated with this report.
21 of 348
3 4b

ENVIRONMENTAL REVIEW (CEQA/NEPA)
On June 30, 2025, budget trailer bills AB 130 and AB 131 were signed and took effect immediately. AB 130 added Public Resources Code Section 21080.66 creating a new statutory CEQA exemption for certain qualifying infill housing projects that meet the following criteria:
• Project site is no more than 20 acres.
• Project site is within the boundaries of an incorporated municipality, or "urban area" as defined by the U.S. Census Bureau.
• Project site was previously developed with "urban uses" or is substantially surrounded by sites developed with urban uses.
• Project is consistent with local zoning standards, applicable general plan standards and any applicable local coastal program, subject to deviations allowed by the State Density Bonus Law.
• Project must be at least half the density deemed appropriate to accommodate lower-income households in the State Housing Element Law, as set forth in Gov.

Code section 65583.2(c)(3)(B)
• Project will not require demolition of a historic structure that was placed on a historic register before the project's preliminary application was submitted. • For projects submitted after Jan. 1, 2025, no portion of the project will be used as a hotel, motel, or bed and breakfast.
• All project sites must satisfy SB 35's site eligibility criteria (farmland, wetlands and conservation/species habitat areas are excluded, and coastal sites, fire hazard zones, hazardous waste sites, earthquake fault zones and flood areas are subject to specified restrictions).

Staff has reviewed the Project and has determined that it meets the criteria and is statutorily exempt from CEQA review per Public Resources Code Section 21080.66.

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION

1. The City Council may elect not to pass the motion as recommended herein. Denial of the motion to set a public hearing for the subject vacation would require the applicant to redesign the Project and resubmit the Project for City review.

2. The City Council may consider any other alternative not proposed by staff.

ADMINISTRATIVE ACTION
22 of 348
4 4b
Submitted by:

Daniel Hernandez, Director of Public Works
Prepared by:

Ruel Villaluna, P.E. Senior Civil Engineer
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Location Map
Exhibit 2: Director of Community Development Report to Planning Commission 23 of 348
MOTION
Moved by Council Member ___________________________________________, seconded by Council Member ______________________________________, that the City Clerk is hereby authorized to set the time, date and place for a public hearing concerning Vacation Case No. 192V; being the vacation of the Portion of First Alley Easterly of Central Avenue, Southerly of California Avenue, Westerly of Orange Street (Alley 239); as set forth in the report of the Director of Public Works dated September 9, 2025 and causing the publishing and posting of notice of said Public Hearing as required by law. The public hearing has been set for October 21, 2025, at 6 PM in the City Council Chambers.

Adopted this ______ day of __________________, 2025.

Vote as follows:

Ayes:

Noes:

Absent:

Abstain:
24 of 348
50 50
50 48
105
50 50
185
50 50
54 54.47
50 178.67
50 155

54.32 50

54.10 50
130.52
53 54.56
50 50
50 50

54.60 54
50 122
50 155
50 179.20
50 119
178.17
50 50
178.57
129.98
107.05
50 50
25 185
53 180

53.64 179.41

53.79 50
50 50
50 54.10
50 50
54 50

53.78 50
50 50
179.31
25 50
187
16 16
53 50

39.15 50
5 62.50
49 9.35
50 30
50 50
50 50

55.20 25
16 50
50 178.26

53.78 25
53 50
50 50
50 3
50 50
50 50
25 50
187
50 50
30 50 50 50

54.395
50 50
155
54 137.50

62.50 50
50 180.07
50 50
50 54.27
50 50
50 50

53.31 129.86
178.88
50 15.13
50 50
50 50

53.78 50
50 50
50 104.87
137.50

53.26 50
122

54.14 50
122
50 139.55
50 50

55.90 178.34
50 50
115.83
50 50
137.50
25 124
29 53.78 5053.78
50 50
139.55
50 53.78
50 54.10
50 122
25 50
50 16
50 50

53.78 130.75
130.07
50 49
187
50 50

53.98 105
179.09
25 50
50 25
50 50
187

37.83 178.46
75 139.55
53 37.87
50 50
124
50 50
48 50
50 179.52
16 137.50
50 50
122
50 62.50
50 50
178.99
55 124
50 50
75 124
50 54.22
20 178.23
75 50
50 50

23.69 112.40
124
130.64
50 53 50
25 178.78
50 50
M.B. 5 - 167
22 TRAC T

POR OF LOTS
16 11 9

GLEN DALE BOU LEVARD T RACT
201
2 60
BLK. 6
POR .
96 VACATED
16 3

POR TION S OF LOTS
18 1
76 216
OF
19 314
50 8
18 16

MOORE'S RESUBDIVISION
21 17
3 23
13 M.B. 9 - 135
60 1
19 5
213
P.M. NO. 1583
10 14
16 5
BLK. 6
16 GLEN DALE BOULEVAR D TRAC T
11 5
20 217
M.B. 10 ~ 157
2 212
16 233

POR TION S
214
22 16
213
16 20

POR LOT S
200
LOT S
M.B. 5 - 167
305
20 LOT 78A
65 318
BLK. 9
121
M.B. 5 ~ 167
222
14 18
35 7
311 319

GLEN DALE BOULEVAR D T RACT

POR TION S OF LOTS
201

DALE HOME TR ACT
60 GLEN DALE
221

GLEN DALE BOULEVAR D TRAC T

RESUBDIVISION
17 205
205
246
32 227
ALLEY
13 M.B. 5 - 167
228
212
12 75
M.B. 10 ~ 157
4 14
18 OF
22 GLEN DALIA PAR K TR ACT
212
2 309
216
96 POR TION S OF LOTS
210
18 LOT
36 243
11 LOT S
11 POR TION OF LOTS
5 77
6 17
9 M. B. 9 ~ 135
306

GLEN DALIA PAR K TR ACT
212
12 215
60 LOT S

MUN IC IPAL PAR KING
16 4
9 60
BLK. 7
70 303
210
8 35
16 18
18 24
232
2 201 LOT S
POR .
20 GLEN DALIA PAR K TR ACT
15 225

GLEN DALE BOULEVAR D
96 212
315
315

23.51 GLEN DALE BOULEVAR D T RACT
3 POR TION S OF LOTS
6 BLK. 7
10 209
4 15
239
65 13
12 M.B. 5 ~ 167
213
1 34
9 301
96 11
10 M.B. 10 ~ 157
LOT
313
1 BLK. 7
232
BLK. 7
23 24
308
LOT 77A
60 M.B. 5 ~ 167
15 33
21 60
16 POR TION S OF LOT S
M.B. 5 - 167
60 16
8 MOORE'S
204
39 78

GLEN DALE BOULEVAR D TRAC T
1 313
16 GLEN DALE BOULEVAR D T RACT
18 POR . OF
Por. of 1st Alley E'ly of N Central Ave, S'ly of W California Ave (Alley 239) - Glendale, CA 50 50 50 48 105
50 50
185
50 50
54 54.47
50 178.67
50 155

54.32 50

54.10 50
130.52
53 54.56
50 50
50 50

54.60 54
50 122
50 155
50 179.20
50 119
178.17
50 50
178.57
129.98
107.05
50 50
25 185
53 180

53.64 179.41

53.79 50
50 50
50 54.10
50 50
54 50

53.78 50
50 50
179.31
25 50
187
16 16
53 50

39.15 50
5 62.50
49 9.35
50 30
50 50
50 50

55.20 25
16 50
50 178.26

53.78 25
53 50
50 50
50 3
50 50
50 50
25 50
187
50 50
30 50 50 50

54.395
50 50
155
54 137.50

62.50 50
50 180.07
50 50
50 54.27
50 50
50 50

53.31 129.86
178.88
50 15.13
50 50
50 50

53.78 50
50 50
50 104.87
137.50

53.26 50
122

54.14 50
122
50 139.55
50 50

55.90 178.34
50 50
115.83
50 50
137.50
25 124
29 53.78 5053.78
50 50
139.55
50 53.78
50 54.10
50 122
25 50
50 16
50 50

53.78 130.75
130.07
50 49
187
50 50

53.98 105
179.09
25 50
50 25
50 50
187

37.83 178.46
75 139.55
53 37.87
50 50
124
50 50
48 50
50 179.52
16 137.50
50 50
122
50 62.50
50 50
178.99
55 124
50 50
75 124
50 54.22
20 178.23
75 50
50 50

23.69 112.40
124
130.64
50 53 50
25 178.78
50 50
M.B. 5 - 167
22 TRAC T

POR OF LOTS
16 11 9

GLEN DALE BOU LEVARD T RACT
201
2 60
BLK. 6
POR .
96 VACATED
16 3

POR TION S OF LOTS
18 1
76 216
OF
19 314
50 8
18 16

MOORE'S RESUBDIVISION
21 17
3 23
13 M.B. 9 - 135
60 1
19 5
213
P.M. NO. 1583
10 14
16 5
BLK. 6
16 GLEN DALE BOULEVAR D TRAC T
11 5
20 217
M.B. 10 ~ 157
2 212
16 233

POR TION S
214
22 16
213
16 20

POR LOT S
200
LOT S
M.B. 5 - 167
305
20 LOT 78A
65 318
BLK. 9
121
M.B. 5 ~ 167
222
14 18
35 7
311 319

GLEN DALE BOULEVAR D T RACT

POR TION S OF LOTS
201

DALE HOME TR ACT
60 GLEN DALE
221

GLEN DALE BOULEVAR D TRAC T

RESUBDIVISION
17 205
205
246
32 227
ALLEY
13 M.B. 5 - 167
228
212
12 75
M.B. 10 ~ 157
4 14
18 OF
22 GLEN DALIA PAR K TR ACT
212
2 309
216
96 POR TION S OF LOTS
210
18 LOT
36 243
11 LOT S
11 POR TION OF LOTS
5 77
6 17
9 M. B. 9 ~ 135
306

GLEN DALIA PAR K TR ACT
212
12 215
60 LOT S

MUN IC IPAL PAR KING
16 4
9 60
BLK. 7
70 303
210
8 35
16 18
18 24
232
2 201 LOT S
POR .
20 GLEN DALIA PAR K TR ACT
15 225

GLEN DALE BOULEVAR D
96 212
315
315

23.51 GLEN DALE BOULEVAR D T RACT
3 POR TION S OF LOTS
6 BLK. 7
10 209
4 15
239
65 13
12 M.B. 5 ~ 167
213
1 34
9 301
96 11
10 M.B. 10 ~ 157
LOT
313
1 BLK. 7
232
BLK. 7
23 24
308
LOT 77A
60 M.B. 5 ~ 167
15 33
21 60
16 POR TION S OF LOT S
M.B. 5 - 167
60 16
8 MOORE'S
204
39 78

GLEN DALE BOULEVAR D TRAC T
1 313
16 GLEN DALE BOULEVAR D T RACT
18 POR . OF
Scale
Location Map - Alley Vacation Case 192V
Map Prepared By:

Mapping & Real Property
March 2024
125 62.5 0 125
Feet
AG Proj: Vac 192V Util Notif Map.mxd
g

W CALIFORNIA AVE
300 FOOT RADIUS
300 FOOT RADIUS
Area Proposed
to be Vacated
18'

W WILSON AVE

N CENTRAL AVE

N ORANGE ST
EXHIBIT 1
25 of 348
1 CITY OF GLENDALE, CALIFORNIA

REPORT TO THE PLANNING COMMISSION

AGENDA ITEM
Report: Request to vacate portions of an 18 foot wide alley, Alley 239, and incorporate into the development of a Density
Bonus application to construct a new 8-story, 655,418
square-foot, mixed-use development consisting 666 multifamily residential dwellings units (14% or 67 units reserved for very low and 1% or 5 units reserved for low-income) 16 live/work units, and 930 parking space garage (one above grade and two levels subterranean) on a site located south of West California Avenue and between North Central
Avenue and North Orange Street consisting of four parcels (APNs: 5642-015-045, 5642-015-056, 5642-015-057, and
5642-015-058, addressed as 236 North Central Avenue).

File No./Case: Alley Vacation Case No. 192V
Location: Alley 239
Applicant: Jamas Gwilliam, c/o MGP XII Glendale Central LLP.

Owners: Jamas Gwilliam, c/o MGP XII Glendale Central LLP.

Approved for August 6, 2025

ADMINISTRATIVE ACTION
Prepared by:

Dennis Joe, Principal Planner
Reviewed by:

Dennis Joe, Principal Planner
Exhibit 2
26 of 348
2 GENERAL BACKGROUND INFORMATION:

General Information
General Plan: DSP/OC (Downtown Specific Plan – Orange Central District) Zone: DSP/OC (Downtown Specific Plan – Orange Central District) Surrounding
Zoning/Use: North: DSP/OC (Downtown Specific Plan – Orange Central District)/ Mixed Use - Commercial and Residential
South: DSP/OC (Downtown Specific Plan – Orange Central District)/ Retail and General Offices
East: DSP/MO (Downtown Specific Plan – Mid-Orange District)/ Public Parking Structure and Commercial
West: DSP/TD (Downtown Specific Plan – Transitional District)/ Retail and General Offices
Existing
Conditions: See attached Exhibits 2 & 3
Background
History: None.

Future Actions: Alley Vacation will be presented to the City Council on a future date to be determined upon review and recommendation by the Planning Commission. The Density Bonus application is set to be presented to the Planning Hearing Officer and the Stage II Design Review application will be brought before the City Council on future dates yet to be determined. 27 of 348
3 ENVIRONMENTAL DETERMINATION
On June 30, 2025, budget trailer bills AB 130 and AB 131 were signed and took effect immediately. AB 130 added Public Resources Code Section 21080.66 creating a new statutory CEQA exemption for certain qualifying infill housing projects that meet the following criteria:
• Project site is no more than 20 acres.
• Project site is within the boundaries of an incorporated municipality, or "urban area" as defined by the U.S. Census Bureau.
• Project site was previously developed with "urban uses" or is substantially surrounded by sites developed with urban uses.
• Project is consistent with local zoning standards, applicable general plan standards and any applicable local coastal program, subject to deviations allowed by the State Density Bonus Law.
• Project must be at least half the density deemed appropriate to accommodate lower-income households in the State Housing Element Law, as set forth in Gov.

Code section 65583.2(c)(3)(B)
• Project will not require demolition of a historic structure that was placed on a historic register before the project's preliminary application was submitted. • For projects submitted after Jan. 1, 2025, no portion of the project will be used as a hotel, motel, or bed and breakfast.
• All project sites must satisfy SB 35's site eligibility criteria (farmland, wetlands and conservation/species habitat areas are excluded, and coastal sites, fire hazard zones, hazardous waste sites, earthquake fault zones and flood areas are subject to specified restrictions).

Staff has reviewed the project and has determined that it meets the criteria and is statutorily exempt from CEQA review per Public Resources Code Section 21080.66 28 of 348
4 ANALYSIS
The Planning Commission’s role is to make findings as to whether the proposed alley vacation will be consistent with the goals and objectives of the City of Glendale Comprehensive General Plan, pursuant to Chapters 2.68 and 12.24 of the City of Glendale Municipal Code, and State Government Code Section 65402.

Alley 239 is a straight alley, approximately 18 feet wide and 607.6 feet long, improved with asphaltic concrete pavement. It contains an 8-inch sanitary sewer mainline, an overhead power pole, and underground electrical conduit. The alley connects California Avenue at the north end to West Wilson Avenue at the south end, bisecting the project site. The applicant proposes to partially vacate approximately 403 feet of the northern portion of Alley 239. The proposed partial vacation of the subject alley will enable the connection of contiguous parcels for proposed Density Bonus and Design Review Board applications to construct a new 8-story, 655,418-square-foot mixed-use development on a 3.7-acre site comprising four parcels (APNs: 5642-015-045, 5642- 015-056, 5642-015-057, and 5642-015-058), addressed as 236 North Central Avenue.

The units and associated amenities will be dispersed within two separate buildings that are connected by a ground-level parking area and second-floor common open space traversing the former alley. Additionally, a new 20-foot wide by 187-foot long alley will be constructed at the southernmost property line of the project site, running westerly to North Orange Street. This new alley will maintain traffic circulation to North Orange Street
The partial vacation of the alley would be consistent with the applicable goals and objectives of the elements of City of Glendale Comprehensive General Plan. In accordance with GMC 12.24 (Street Vacations) and Government Code Section 65402, the proposed vacation of the public alley is in conformance with the City's General Plan, given that this portion of the alley is not needed for public purposes. The adjacent properties located to the south along Central and Orange Avenue will retain access from the remaining southerly portion of Alley 239. In addition, a new east-west alley connecting Alley 239 with Orange Street will be dedicated and constructed as part of the project.

The Project is consistent with the General Plan Land Use Element and DSP. The General Plan Land Use Element designation for the site is DSP. The Project is consistent with the DSP goal of concentrating growth in the downtown to relieve development pressure on existing residential neighborhoods. The Land Use Element Residential Goal #4 supports the creation of higher density residential development in those areas best suited from the standpoint of accessibility, current development, community organization, transportation and circulation facilities and economic feasibility. The Project meets these goals by providing 682 residential units in an area with abundant retail, commercial and entertainment uses within walking distance and convenient access to public transit.

The Project achieves certain goals and policies of the Housing Element. Housing Element Goal 1 sets the objective of a city with a wide range of housing types to meet the needs of current and future residents. Towards that goal Policy 1.3 promotes the dispersion of affordable housing throughout the City while recognizing the potential for the integration of market rate and affordable units within individual projects. Policy 1.4 29 of 348 5 encourages higher-density residential development in proximity to public transportation, jobs, services, and activity centers. Goal 3 sets the objective of a city with increased opportunities for affordable and special needs housing development. Specifically, Policy

3.2 promotes the development of extremely low, very low, low and moderate income housing by allowing developers density bonuses or other financial incentives for providing units for low and moderate income residents. As noted, the project includes a Bonus Density reserving 72 affordable units to very low- and low-income households that are interspersed with the project’s market-rate units. The Project is also located in the Orange-Central District of the downtown within walking distance of public transportation, jobs and services.

The Project implements goals of the Recreation Element and Community Facilities Elements. Policy #3 of the Recreation Element establishes that the City shall supplement existing park land assets via the development of an in-lieu fee structure for the acquisition and management of recreational land in connection with the development review process.

The Community Facilities Element contains the policy to preserve the high standards of library facilities in their educational and recreational roles. The Project is required to pay Development Impact Fees which will provide funding to Community Services and Parks’ and Library, Arts & Culture’s CIP programs, including developing new or rehabilitating existing parks and recreation facilities and libraries.

The Circulation Element Objective 2.1 encourages land use which can be supported within the capacity constraints of existing and realistic future infrastructure. The purpose of the alley vacation is to allow for the construction of a density bonus project with 666 residential units and 16 live/work units, featuring 67 affordable units restricted to very lowincome households and 5 affordable units restricted to low-income households. The project site is currently served by Central Avenue, California Avenue, and Orange Street.

According to the Circulation Element, Central Avenue is designated as a major arterial, while California Avenue and Orange Street are classified as urban collector streets. Major arterials are typically the widest streets in urban areas, with 4 to 6 lanes, and handle the highest traffic volumes. Designed for efficient travel across the city, they use traffic controls, restricted parking, and limited access points to keep traffic moving smoothly.

These roads connect to freeways, other arterials, neighborhood and community streets, business districts, and major destinations both within the city and in neighboring areas.

They also accommodate regional traffic, serve as truck routes, support high levels of public transit use, and are often considered for bike lanes or routes. Urban collectors are roads typically bordered by commercial, industrial, or multi-family residential properties.

They serve to channel traffic from local streets and direct it toward major or minor arterials.

While urban collectors carry fewer light trucks than minor arterials, these streets often function as transit routes and may also support bicycle lanes or routes. These roads are typically two lanes wide and may include on-street parking on one or both sides, or other roadway features such as center turn lanes, as determined by the city. Given the subject site is surrounded by a major arterial and urban collector streets, these streets can support the capacity of a larger scale project with 666 residential units and 16 live/work units. Provided that the project is consistent with the Land Use Element, complements the mix of existing commercial and residential uses surrounding the subject site, and is 30 of 348
6 currently supported by streets designed to handle the vehicular capacity of mixed use, the project is consistent with the Circulation Element.

RECOMMENDATION
The Planning Division recommends that the Planning Commission find that the proposed Alley Vacation Case No. 192V (Alley 239) is consistent with the City’s General Plan.

EXHIBITS

1. Motion of Finding of Consistency with the General Plan

2. Photographs

3. Location Map

4. Proposed Street Vacation Map

5. Site Plan
31 of 348
4c
25-88633

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Designation of Authorized Representatives for FEMA and Cal OES Disaster Assistance

1. Resolution to designate City Manager, Director of Finance, and Assistant Director of Finance as authorized representatives to apply and obtain disaster assistance from FEMA and Cal OES when major disasters strike.

COUNCIL ACTION
Item Type: Consent Calendar
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
The City applies for assistance from Federal Emergency Management Agency (FEMA) and California Governor’s Office of Emergency Services (Cal OES) when major disasters strike. As such, designation of the City’s authorized representative for non-State agencies is required to be filed with Cal OES. This filing must be done every three years or when there is a change such as a new hire, separation, or job-title change and must be filed along with a City Council resolution. Due to the recent hiring of the new Director of Finance, a new designation must be filed with Cal OES along with the resolution. 32 of 348
4c 2
25-88633

RECOMMENDATION
The City Council designate City Manager, Director of Finance and Assistant Director of Finance as the authorized representatives to apply and obtain disaster assistance from FEMA and Cal OES when major disasters strike.

ANALYSIS
The City applies for assistance from FEMA and Cal OES when major disasters strike.

FEMA administers federal disaster assistance programs, and Cal OES administer state disaster assistance programs. A designation of the City of Glendale’s authorized agents is required to be on file with Cal OES to be eligible to receive funding. According to the instruction of Cal OES form 130, a new designation of the City’s agents via Council resolution is required if the previously submitted document is older than three years from the last date of Council approval, or a change to the existing designees subsequent to the last filing.

Due to the recent hiring of the new Director of Finance, a new designation and resolution is required. By approving the attached resolution, the City Council designates the following individuals to be the City’s representatives to FEMA and Cal OES: City Manager Roubik Golanian, Director of Finance Shijie Liang, and Assistant Director of Finance ShuJun Li.

STAKEHOLDERS/OUTREACH
N/A

FISCAL IMPACT
There is no fiscal impact associated with this report.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
N/A

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION
The City Council may consider designating other City staff as the authorized representatives.

ADMINISTRATIVE ACTION
Submitted by:

Jack Liang, Director of Finance
Prepared by:

Shu-Jun Li, Assistant Director of Finance
33 of 348
4c 3
25-88633
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Cal OES Form 130 - Designation of Applicant’s Agent Resolution for Non-State Agencies
34 of 348

DESIGNATION OF APPLICANT'S AGENT RESOLUTION FOR NON-STATE AGENCIES

BE IT RESOLVED BY THE OF THE
(Governing Body) (Name of Applicant)

THAT , OR
(Title of Authorized Agent)
, OR
(Title of Authorized Agent)
(Title of Authorized Agent)
is hereby authorized to execute for and on behalf of the , (Name of Applicant)
a public entity established under the laws of the State of California, this application and to file it with the California Governor’s Office of Emergency Services for the purpose of obtaining federal financial assistance for any existing or future grant program, including, but not limited to any of the following:
- Federally declared Disaster (DR), Fire Mitigation Assistance Grant (FMAG), California State Only Disaster (CDAA), Immediate Services Program (ISP), Hazard Mitigation Grant Program (HMGP), Building Resilient Infrastructure and Communities (BRIC), Legislative Pre-Disaster Mitigation Program (LPDM), under - Public Law 93-288 as amended by the Robert T. Stafford Disaster Relief and Emergency Assistance Act of 1988, and/or state financial assistance under the California Disaster Assistance Act.
- Flood Mitigation Assistance Program (FMA), under Section 1366 of the National Flood Insurance Act of 1968.
- National Earthquake Hazards Reduction Program (NEHRP) 42 U.S. Code 7704 (b) ((2) (A) (ix) and 42 U.S. Code 7704 (b) (2) (B) National Earthquake Hazards Reduction Program, and also The Consolidated Appropriations Act, 2018, Div. F, Department of Homeland Security Appropriations Act, 2018, Pub. L. No. 115-141 - California Early Earthquake Warning (CEEW) under CA Gov Code – Gov, Title 2, Div. 1, Chapter 7, Article 5, Sections 8587.8, 8587.11, 8587.12 That the , a public entity established under the
(Name of Applicant)
laws of the State of California, hereby authorizes its agent(s) to provide to the Governor’s Office of Emergency Services for all matters pertaining to such state disaster assistance the assurances and agreements required.

STATE OF CALIFORNIA

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES

DESIGNATION OF APPLICANT'S AGENT RESOLUTION

NON-STATE AGENCIES
OES-FPD-130 (Rev. 10-2022)

RECOVERY DIRECTORATE

FINANCIAL PROCESSING DIVISION
Cal OES ID No: _____________
Rev. 10-2022 Page 1 of 4 OES-FPD-130
037-30000-00
Council City of Glendale City of Glendale
City of Glendale City Manager Director of Finance Assistant Director of Finance 35 of 348
Please check the appropriate box below
This is a universal resolution and is effective for all open and future disasters/grants declared up to three (3) years following the date of approval.

This is a disaster/grant specific resolution and is effective for only disaster/grant number(s):

Passed and approved this __day of , 20
(Name and Title of Governing Body Representative)
(Name and Title of Governing Body Representative)
(Name and Title of Governing Body Representative)

CERTIFICATION
I, , duly appointed and of
(Name) (Title)
, do hereby certify that the above is a true and
(Name of Applicant)
correct copy of a resolution passed and approved by the (Governing Body)
of the on the day of , 20 .
(Name of Applicant)
(Signature) (Title)

STATE OF CALIFORNIA

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES

DESIGNATION OF APPLICANT'S AGENT RESOLUTION

NON-STATE AGENCIES
OES-FPD-130 (Rev. 10-2022)

RECOVERY DIRECTORATE

FINANCIAL PROCESSING DIVISION
Rev. 10-2022 Page 2 of 4 OES-FPD-130
✔
25 Ara Najarian, Mayor Ardy Kassakhian, Council member, Daniel Brotman, Council member Elen Asatryan, Council member, Vartan Gharpetian, Council member Suzie Abajian City Clerk City Clerk City of Glendale City of Glendale Council 25
36 of 348
Cal OES Form 130 Instructions
A Designation of Applicant’s Agent Resolution for Non-State Agencies is required of all Applicants to be eligible to receive funding. A new resolution must be submitted if a previously submitted resolution is older than three (3) years from the last date of approval, is invalid, or has not been submitted.

When completing the Cal OES Form 130, Applicants should fill in the blanks on pages 1 and 2. The blanks are to be filled in as follows:

Resolution Section:

Governing Body: This is the group responsible for appointing and approving the Authorized Agents.

Examples include: Board of Directors, City Council, Board of Supervisors, Board of Education, etc.

Name of Applicant: The public entity established under the laws of the State of California.

Examples include: School District, Office of Education, City, County or Non-profit agency that has applied for the grant, such as: City of San Diego, Sacramento County, Burbank Unified School District, Napa County Office of Education, University Southern California.

Authorized Agent: These are the individuals that are authorized by the Governing Body to engage with the Federal Emergency Management Agency and the California Governor’s Office of Emergency Services regarding grants for which they have applied.

There are two ways of completing this section:

1. Titles Only: The titles of the Authorized Agents should be entered here, not their names. This allows the document to remain valid if an Authorized Agent leaves the position and is replaced by another individual. If “Titles Only” is the chosen method, this document must be accompanied by either a cover letter naming the Authorized Agents by name and title, or the Cal OES AA Names document. The supporting document can be completed by any authorized person within the Agency (e.g., administrative assistant, the Authorized Agent, secretary to the Director). It does not require the Governing Body’s signature.

2. Names and Titles: If the Governing Body so chooses, the names and titles of the Authorized Agents would be listed. A new Cal OES Form 130 will be required if any of the Authorized Agents are replaced, leave the position listed on the document, or their title changes.

STATE OF CALIFORNIA

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES

DESIGNATION OF APPLICANT'S AGENT RESOLUTION

NON-STATE AGENCIES
OES-FPD-130 (Rev. 10-2022)

RECOVERY DIRECTORATE

FINANCIAL PROCESSING DIVISION
Rev. 10-2022 OES-FPD-130 Page 3 of 4
37 of 348
Checking Universal or Disaster-Specific Box: A Universal resolution is effective for all past disasters and for those declared up to three (3) years following the date of approval. Upon expiration it is no longer effective for new disasters, but it remains in effect for disasters declared prior to expiration. It remains effective until the disaster goes through closeout unless it is superseded by a newer resolution.

Governing Body Representative: These are the names and titles of the approving Board Members.

Examples include: Chairman of the Board, Director, Superintendent, etc. The names and titles cannot be one of the designated Authorized Agents. A minimum of three (3) approving board members must be listed. If less than three are present, meeting minutes must be attached in order to verify a quorum was met.

Certification Section:

Name and Title: This is the individual in attendance who recorded the creation and approval of this resolution.

Examples include: City Clerk, Secretary to the Board of Directors, County Clerk, etc. This person cannot be one of the designated Authorized Agents or Approving Board Member. If a person holds two positions (such as City Manager and Secretary to the Board) and the City Manager is to be listed as an Authorized Agent, then that person could sign the document as Secretary to the Board (not City Manager) to eliminate “Self-Certification.”

STATE OF CALIFORNIA

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES

DESIGNATION OF APPLICANT'S AGENT RESOLUTION

NON-STATE AGENCIES
OES-FPD-130 (Rev. 10-2022)

RECOVERY DIRECTORATE

FINANCIAL PROCESSING DIVISION
Rev. 10-2022 Page 4 of 4 OES-FPD-130
38 of 348
4d
25-88634

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Acceptance of Federal Workforce Innovation and Opportunity Act funds from the State of California, Employment Development Department and award of contracts to the Glendale Youth Alliance and the City of Burbank
Motion:

1. Accepting the Federal Workforce Innovation and Opportunity Act (WIOA) funds in the amount of $848,928 from the State of California, Employment Development Department; and authorizing the City Manager, or a designee, to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding.

2. Authorizing the City Manager, or a designee, to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $703,428 from the WIOA federal grant for the period of July 1, 2025 to June 30, 2026.

3. Authorizing the City Manager, or a designee, to enter into and execute a Contract with City of Burbank in an amount not to exceed $145,500 from the WIOA federal grant for the period of July 1, 2025 to June 30, 2026.

COUNCIL ACTION
Item Type: Consent Calendar
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
The State of California, Employment Development Department awarded the Verdugo Workforce Development Board (VWDB) funding of $848,928 from July 1, 2025, to June 30, 2026, to provide WIOA employment services to adults and youths in the Verdugo region. The VWDB receives WIOA funds on an annual basis.

From July 1, 2025, to June 30, 2026, upon City Council approval, the VWDB will award WIOA Youth grant funds to the Glendale Youth Alliance (GYA) in the amount of $703,428 to recruit, enroll, and provide work experience for twenty-four (24) In-School and sixty (60) Out-of-School Youth, as defined by the WIOA federal regulations. 39 of 348
4d 2
25-88634
From July 1, 2025, to June 30, 2026, upon City Council approval, the VWDB will award WIOA grant funds to the City of Burbank in the amount of $145,500 to operate the City of Burbank’s Job Connect from the Burbank Central Library as the affiliate site to the Verdugo Jobs Center (VJC) and provide general WIOA employment services to the public.

RECOMMENDATION
That City Council:
(1) Accept the WIOA funds in the amount of $848,928 from the State of California, Employment Development Department; and authorize the City Manager to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding; (2) Authorize the City Manager to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $703,428 from the WIOA federal grant for the period of July 1, 2025, to June 30, 2026; and (3) Authorize the City Manager to enter into and execute a Contract with City of Burbank in an amount not to exceed $145,500 from the WIOA federal grant for the period of July 1, 2025, to June 30, 2026.

ANALYSIS
The Verdugo Consortium is a Joint Powers Agreement (JPA) comprised of the cities of Glendale, Burbank, and La Cañada Flintridge. The Verdugo Workforce Development Board (VWDB) is the planning and policy body for the Consortium. Its purpose is to provide employment and training programs within the three cities and to allocate and award Workforce Innovation and Opportunity Act (WIOA) funds toward its goals. Through the JPA, the City of Glendale (the City) has responsibility for the administration of all Consortium activities, including the execution of contracts with vendors to deliver workforce services. As the administrative entity for the Verdugo Consortium, the City Council on behalf of the City of Glendale approves all contracts and funding awards recommendations by the VWDB, which includes WIOA funds.

The VWDB receives federal WIOA grant funds to provide employment services to the public. These services include job preparation training, job exploration, workplace readiness skills training, work-based learning experiences, on-the-job training and skills training to name a few. The overall goal is to enhance regional economies by having a robust skilled workforce.

The WIOA funds from the State of California, Employment Development Department total $848,928 from July 1, 2025, to June 30, 2026, to provide general WIOA services as well as WIOA Youth-In-School and Out-of-School services for youths ages 14 to 24, with up to 200 hours of paid work experience in placements that match the students’ interests 40 of 348
4d 3
25-88634
and aptitudes.

The GYA has been operating year-round youth employment programs and summer employment programs since 1994 and has been operating WIOA youth employment programs since 2000. For the 2025-2026 program year, the VWDB has recommended awarding GYA with $703,428 in workforce funds to provide services to youth with multiple barriers in the Verdugo region. GYA will administer the work experience component of the program and provide case management services. GYA’s established business relationships with local employers will enable successful connection between employers and students.

The City of Burbank is a partner in the Verdugo Consortium. Although the Verdugo Jobs Center is the only comprehensive one-stop center in the Verdugo Consortium, in order to provide services more conveniently to the job seekers and employers in Burbank, the City of Burbank operates an affiliate site of the Verdugo Jobs Center from its Burbank main library location called Job Connect. The VWDB has recommended awarding the City of Burbank $145,500 for the 2025-2026 program year. These funds will be used to provide core workforce services to at least eighty (80) new clients per month, and Rapid Response assistance to local businesses that are experiencing major layoffs. The Burbank Affiliate site has been in operation since 2000, and has a proven track record of successfully serving Burbank job seekers and employers.

STAKEHOLDERS/OUTREACH
The VWDB is responsible for accepting awarded grants and providing initial approval to enter into contracts, prior to submission to City Council for approval. As such, this item was discussed at the public workforce board meeting held on June 25, 2025 where stakeholders were given the opportunity to participate and comment on this item. At this meeting, the Board approved the acceptance of the grant award as well as the contracts needed to perform the grant requirements.

FISCAL IMPACT
The funding for the WIOA grant totals $848,928, of which $703,428 will be used for the contract with the Glendale Youth Alliance and $145,500 for the contract with the City of Burbank. The grant award was already appropriated during the FY 25-26 budget process; therefore, no new appropriation is requested at this time. The City Council approved funding is outlined below:

Existing Appropriation
Amount Account String Funding Source
$703,428 GL: 43110-2060-CSP-0020-P0000
PL: CSP01388AG
Workforce Fund
$145,500 GL: 43110-2060-CSP-0020-P0000
PL: CSP01386AG
Workforce Fund
41 of 348
4d 4
25-88634

ENVIRONMENTAL REVIEW (CEQA/NEPA)
The action being considered does not constitute a “project” within the meaning of CEQA pursuant to CEQA Guidelines section 15378(b)(5), as it constitutes an organizational or administrative activity of government that will not result in direct or indirect physical changes in the environment; thus, it is not subject to CEQA pursuant to CEQA Guidelines section 15060(c)(3).

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION

1. The City Council may decline to adopt the motions as recommended herein. This would result in the inability to comply with grant requirements.

2. The City Council may consider any other alternative not proposed by staff.

ADMINISTRATIVE ACTION
Submitted by:

Onnig Bulanikian, Director of Community Services & Parks Prepared by:

Judith Velasco, Workforce Development Administrator
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Minutes of the meeting of the Verdugo Workforce Development Board, June 25, 2025.
42 of 348
MOTION
Moved by Council Member , seconded by
Council Member , that the Council of the
City of Glendale hereby:

1. Accepts the Federal Workforce Innovation and Opportunity Act (WIOA) funds in the amount of $848,928 from the State of California, Employment Development Department; and authorizes the City Manager, or a designee, to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding, subject to the approval by the City Attorney.

2. Authorizes the City Manager or his designee to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $703,428 from the WIOA federal grant for the period of July 1, 2025 to June 30, 2026, subject to the approval by the City Attorney.

3. Authorizes the City Manager or his designee to enter into and execute a Contract with City of Burbank in an amount not to exceed $145,500 from the WIOA federal grant for the period of July 1, 2025 to June 30, 2026, subject to the approval by the City Attorney.

Vote as Follows:

Ayes:

Noes:

Absent:

Abstain:
43 of 348

VERDUGO WORKFORCE DEVELOPMENT BOARD

FULL BOARD MEETING MINUTES
6/25/2025
9:30 a.m. to 10:30 a.m.

VWDB Full Board Minutes 6/25/2025 Page 1 of 3
MEMBERS PRESENT: Jose Barba, Sonya Kay Blake, Vicki Brannock, Alexis Carter, Marisol Espinoza, Nick Hacopian, Caroline Lett, Iskra Martinez, Kathy McIntyre, Nicole Miller, Stephanie O’Keefe, Terry Walker
MEMBERS ABSENT: Ara Aslanian, Luiza Balyan, Onnig Bulanikian, Mary Hamzoian, Steve Kaplan, Debbie Kukta, Pamela
Marcello, Michael Ritterbrown, Veronica Romero, Soua
Vang

COMMUNITY &

OTHER AGENCY
REPRESENTATIVES:

Monica Casas, Eliza Dzhaneryan, Karine Grigoryan
STAFF PRESENT: Diana Montecino, MaryAnn Pranke Judith Velasco, Melissa Younesian
CALL TO ORDER: 9:35 am by Vice Chair Marisol Espinoza
I. Introductions
A. Vice Chair Marisol welcomed and introduced Nicole Miller from IATSE Local B-132.

II. Minutes of February 12, 2025, April 09, 2025, and May 21, 2025 A. Minutes presented and reviewed. MOTION: Nick Hacopian 2 nd: Veronica Romero
ABSTAIN: Jose Barba
Action: APPROVED
III. Action Items
A. Approval of the recommendation for Jamie Keyser Thomas to be appointed to the Verdugo Workforce Development Board (VWDB), in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act (WIOA) of 2014 MOTION FOR CONSENT ITEM A Motion: Stephanie O’Keefe 2
nd: Vicki Brannock
Abstain: Jamie Keyser Thomas
B. Approval of the recommendation for Caroline Lett to be appointed to the Verdugo Workforce Development Board, in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act of 2014
MOTION FOR CONSENT ITEM B Motion: Nick Hacopian 2
nd: Vicki Brannock
C. Approval of the recommendation for Kathleen McIntyre to be appointed to the Verdugo Workforce Development Board, in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act of 2014
MOTION FOR CONSENT ITEM C Motion: Sonya Kay Blake 2
nd: Veronica Romero
Exhibit 1
44 of 348

VERDUGO WORKFORCE DEVELOPMENT BOARD

FULL BOARD MEETING MINUTES
6/25/2025
9:30 a.m. to 10:30 a.m.

VWDB Full Board Minutes 6/25/2025 Page 2 of 3
D. Approval of the recommendation for Nicole Miller to be appointed to the Verdugo Workforce Development Board, in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act of 2014
MOTION FOR CONSENT ITEM D Motion: Stephanie O’Keefe 2
nd: Veronica Romero
Abstain: Nicole Miller
E. Approval of the VWDB’s Local Workforce Development Plan 2025-2028 and the Los Angeles Basin Regional Planning Unit’s Regional Workforce Development Plan 2025-2028 and their submission to the California Workforce Development Board and the State of California Employment Development Department
F. Approval of the allocation of $145,500 to City of Burbank’s Job Connect to provide services in Burbank as the Verdugo Jobs Center Affiliate Site for Fiscal Year 2025-2026 G. Approval of contract amendment with Glendale Youth Alliance for the Student Training and Employment Program grant to extend the end date from June 30, 2025 to June 30, 2026 and increase funding by$183,327 for an amended contract amount not to exceed $601,341, to continue administration of work experience services
H. Approval of contract amendment with Glendale Community College’s Professional Development Center for the Student Training and Employment grant to extend the end dates from June 30, 2025 to June 30, 2026, and increase funding in an amount of $13,600 for a total contract amount of $27,200
I. Approval of the Verdugo Workforce Development Board’s Preliminary Budget for Fiscal Year 2025-2026
J. Approval to designate Glendale Youth Alliance as the board’s youth provider for Fiscal Year 2025-2026 and to enter into contract with Glendale Youth Alliance for Fiscal Year 2025-2026 in an amount not to exceed $703,428 in Workforce Innovation and Opportunity Act funding for Youth Services
K. Approval to accept anticipated preliminary funds from the Los Angeles County Department of Economic Opportunity for Fiscal Year 2025-2026 for the Youth@Work program and to enter into contract with Glendale Youth Alliance to provide Youth Services L. Approval to release the Verdugo Workforce Development Board’s America’s Job Centers of California Operator Application for July 1, 2025 – June 30, 2029 for public review and comment M. Approval of Fiscal Year 2025-2026 Slate of Officers for the Verdugo Workforce Development Board
MOTION FOR CONSENT ITEM E – M Motion: Vick Brannock 2
nd: Alexis Carter
IV. Director’s Report
A. Executive Director Judith Velasco introduced Denise Hayes, a successful participant of the Verdugo Jobs Center (VJC), who obtained her Class A Driving License through Hi-Desert Trucking School and is currently working as a long-haul driver. Ms. Hayes provided a summary of her experience with the services that VJC provided to her. 45 of 348

VERDUGO WORKFORCE DEVELOPMENT BOARD

FULL BOARD MEETING MINUTES
6/25/2025
9:30 a.m. to 10:30 a.m.

VWDB Full Board Minutes 6/25/2025 Page 3 of 3

1. The VWDB applauded Ms. Hayes on her accomplishments.

2. Ms. Hayes emphasized the importance of marketing and letting the community know about the services available at VJC. If her training provider had not mentioned VJC to her, she never would have known about the services available.

B. Ms. Velasco announced the VWDB’s staff goals for the upcoming fiscal year which are:

1. Alignment with industries and partners in apprenticeships with a manufacturing focus,

2. Identify business champions,

3. Regular communication with elected local officials,

4. Diversify revenue, and

5. Develop career pathways.
a. Discussion: The board members provided feedback on the goals. i. Sonya Kay Blake advised that it is strategic to align with prevailing priorities and create an action plan for the sectors the VWDB has in mind.
ii. Stephanie O’Keefe mentioned that the concept of apprenticeships is somewhat dated and needs to be rebranded.
iii. Terry Walker added that apprenticeships can help offset expenses, if the employer took on the responsibility of training expense.
iv. Nicole Miller emphasized that constant communication with elected officials will help as well as sharing the available resources more publicly. v. Jose Barba recommended documenting the client’s story; as they meet their milestones, referencing their timeline.
vi. Vicki Brannock stated that Biocom has been trying to pitch the apprenticeship model to employers in the Biotech world, but employers are not interested. A challenge is that employers are more familiar with the internship model and are hesitant to change.

C. Ms. Velasco shared that the VWDB received an 18% increase in allocation for WIOA Adult, Dislocated Work and Youth funds.

D. Ms. Velasco disclosed that WIOA remains as status quo.

1. The Make America Skilled Again (MASA) Initiative brings the possibility of grant funds being consolidated into a block grant.
i. Currently WIOA funds flow to the state and then allocated to the boards.

E. Ms. Velasco announced that she will be reaching out to board members to schedule meetings with Local Elected Officials on MASA, request Letters of Support, and meet with board members to discuss apprenticeship models and new opportunities.

V. Other Business and Announcements
A. Ms. Velasco shared the recent awards the VWDB and VJC have received for services provided through successful partnerships.

B. The next VWDB meeting will be held in-person at the VJC on Wednesday, September 24, 2025 at 9:30 am.

II. Public Comments: None
III. Adjournment: 10:33 am
46 of 348
4e
25-88635

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Acceptance of Youth@Work funds from the Los Angeles County, Department of Economic Opportunity and award of contract to Glendale Youth Alliance Motion:

1. Accepting the Youth@Work funds from the Los Angeles County, Department of Economic Opportunity in the amount of $353,100; and authorizing the City Manager, or a designee, to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding, subject to the approval by the City Attorney.

2. Authorizing the City Manager, or a designee, to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $326,618 from the Youth@Work grant for the period of July 1, 2025 to June 30, 2026, subject to the approval by the City Attorney, subject to the approval by the City Attorney.

COUNCIL ACTION
Item Type: Consent Calendar
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
The Verdugo Workforce Development Board (VWDB) has a long-standing history of designing and implementing workforce programs in the Verdugo Workforce Development Area, which consists of the cities of Glendale, Burbank and La Cañada Flintridge.

The Los Angeles County, Department of Economic Opportunity (DEO) awarded the VWDB funding of $353,100 from July 1, 2025 to June 30, 2026 to provide work experience and job preparation training for students under the Youth@Work program. The VWDB has received this funding for over a decade to support students with the most barriers to employment with work-based learning opportunities.

From July 1, 2025 to June 30, 2026, the VWDB will award Youth@Work grant funds to Glendale Youth Alliance (GYA) in the amount of $326,618 to recruit, enroll, and provide work experience for up to eighty-four (84) participants. 47 of 348
4e 2
25-88635

RECOMMENDATION
That City Council:
(1) Accept the Youth@Work funds from the Los Angeles County, Department of Economic Opportunity in the amount of $353,100; and authorize the City Manager to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding, subject to the approval by the City Attorney;
(2) Authorize the City Manager to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $326,618 from the Youth@Work grant for the period of July 1, 2025 to June 30, 2026, subject to the approval by the City Attorney.

ANALYSIS
The Verdugo Consortium is a Joint Powers Agreement (JPA) comprised of the cities of Glendale, Burbank, and La Cañada Flintridge. The Verdugo Workforce Development Board (VWDB) is the planning and policy body for the Consortium. Its purpose is to provide employment and training programs within the three cities and to allocate and award Workforce Innovation and Opportunity Act (WIOA) funds toward its goals. Through the JPA, the City of Glendale (the City) has responsibility for the administration of all Consortium activities, including the execution of contracts with vendors to deliver workforce services.

The County of Los Angeles, Department of Economic Opportunity provides annual funding to the Los Angeles Basin Workforce Development Boards to provide summer and year-round youth employment programs for their respective workforce regions under the program Youth@Work. The Youth@Work Program has broader eligibility criteria for its participants than the WIOA federal youth funds and allows for greater participation of the youth in our region who are English Language Learners, Foster Youth, Homeless Youth, and Youth on Parole without the restrictions of income.

The Youth@Work grant funding for FY 2025-2026 is for $353,100, from July 1, 2025, to June 30, 2026, and will serve up to eighty-four participants ages 14 to 24, with up to 160 hours of paid work experience in placements that match the participants’ interests and aptitudes as well as personal enrichment training, requiring the program to have a Career Pathway focus.

GYA, the VWDB’s youth provider, will administer the work experience component of the program and receive $326,618 for staffing and operational expenses, including the administration of the youth payroll. Since 2000, GYA has been operating youth employment programs and has established business relationships with local employers which will enable successful connections between these employers and students to have a dynamic work base learning experience.
48 of 348
4e 3
25-88635
The remaining $26,482 will be used by the VWDB to cover administrative expenses that includes oversight of the program.

STAKEHOLDERS/OUTREACH
The VWDB is responsible for accepting grant awards and providing initial approval to enter into contracts, prior to submission to City Council for approval. As such, this item was discussed at the public workforce board meeting held on June 25, 2025, at the Verdugo Jobs Center, where stakeholders were given the opportunity participate and comment on this item. At this meeting, the Board approved the acceptance of the grant award as well as the contracts needed to perform the grant requirements.

FISCAL IMPACT
The Youth@Work grant award is $353,100, of which $326,618 will be used for the contract with Glendale Youth Alliance. The grant award was appropriated during the FY 25-26 budget; therefore, no new appropriation is requested at this time. The approved funding is outlined below:

Existing Appropriation
Amount Account String Funding Source
$353,100 GL: 43110-2060-CSP-0020-P0000
PL: CSP01384AG
Workforce Fund-Local Grant

ENVIRONMENTAL REVIEW (CEQA/NEPA)
The action being considered does not constitute a “project” within the meaning of CEQA pursuant to CEQA Guidelines section 15378(b)(5), as it constitutes an organizational or administrative activity of government that will not result in direct or indirect physical changes in the environment; thus, it is not subject to CEQA pursuant to CEQA Guidelines section 15060(c)(3).

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION
1: The City Council may decline to adopt the motions as recommended herein. This would result in the inability to comply with grant requirements.

Alternative 2: The City Council may consider any other alternative not proposed by staff.

ADMINISTRATIVE ACTION
Submitted by:

Onnig Bulanikian, Director of Community Services & Parks 49 of 348
4e 4
25-88635
Prepared by:

Judith Velasco, Workforce Development Administrator
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Minutes of the meeting of the Verdugo Workforce Development Board, June 25, 2025.
50 of 348
MOTION
Moved by Council Member , seconded by
Council Member , that the Council of the
City of Glendale hereby:

1. Accepts Youth@Work funds from the Los Angeles County, Department of Economic Opportunity in the amount of $353,100; and authorizes the City Manager, or a designee, to enter into and execute all agreements, amendments, certifications, and documents necessary to accept and implement the funding, subject to the approval by the City Attorney.

2. Authorizes the City Manager or his designee to enter into and execute a Contract with Glendale Youth Alliance in an amount not to exceed $326,618 from the Youth@Work grant for the period of July 1, 2025 to June 30, 2026, subject to the approval by the City Attorney.

Vote as Follows:

Ayes:

Noes:

Absent:

Abstain:
51 of 348

VERDUGO WORKFORCE DEVELOPMENT BOARD

FULL BOARD MEETING MINUTES
6/25/2025
9:30 a.m. to 10:30 a.m.

VWDB Full Board Minutes 6/25/2025 Page 1 of 3
MEMBERS PRESENT: Jose Barba, Sonya Kay Blake, Vicki Brannock, Alexis Carter, Marisol Espinoza, Nick Hacopian, Caroline Lett, Iskra Martinez, Kathy McIntyre, Nicole Miller, Stephanie O’Keefe, Terry Walker
MEMBERS ABSENT: Ara Aslanian, Luiza Balyan, Onnig Bulanikian, Mary Hamzoian, Steve Kaplan, Debbie Kukta, Pamela
Marcello, Michael Ritterbrown, Veronica Romero, Soua
Vang

COMMUNITY &

OTHER AGENCY
REPRESENTATIVES:

Monica Casas, Eliza Dzhaneryan, Karine Grigoryan
STAFF PRESENT: Diana Montecino, MaryAnn Pranke Judith Velasco, Melissa Younesian
CALL TO ORDER: 9:35 am by Vice Chair Marisol Espinoza
I. Introductions
A. Vice Chair Marisol welcomed and introduced Nicole Miller from IATSE Local B-132.

II. Minutes of February 12, 2025, April 09, 2025, and May 21, 2025 A. Minutes presented and reviewed. MOTION: Nick Hacopian 2 nd: Veronica Romero
ABSTAIN: Jose Barba
Action: APPROVED
III. Action Items
A. Approval of the recommendation for Jamie Keyser Thomas to be appointed to the Verdugo Workforce Development Board (VWDB), in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act (WIOA) of 2014 MOTION FOR CONSENT ITEM A Motion: Stephanie O’Keefe 2
nd: Vicki Brannock
Abstain: Jamie Keyser Thomas
B. Approval of the recommendation for Caroline Lett to be appointed to the Verdugo Workforce Development Board, in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act of 2014
MOTION FOR CONSENT ITEM B Motion: Nick Hacopian 2
nd: Vicki Brannock
C. Approval of the recommendation for Kathleen McIntyre to be appointed to the Verdugo Workforce Development Board, in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act of 2014
MOTION FOR CONSENT ITEM C Motion: Sonya Kay Blake 2
nd: Veronica Romero
Exhibit 1
52 of 348

VERDUGO WORKFORCE DEVELOPMENT BOARD

FULL BOARD MEETING MINUTES
6/25/2025
9:30 a.m. to 10:30 a.m.

VWDB Full Board Minutes 6/25/2025 Page 2 of 3
D. Approval of the recommendation for Nicole Miller to be appointed to the Verdugo Workforce Development Board, in compliance with State and Federal requirements under the Workforce Innovation and Opportunity Act of 2014
MOTION FOR CONSENT ITEM D Motion: Stephanie O’Keefe 2
nd: Veronica Romero
Abstain: Nicole Miller
E. Approval of the VWDB’s Local Workforce Development Plan 2025-2028 and the Los Angeles Basin Regional Planning Unit’s Regional Workforce Development Plan 2025-2028 and their submission to the California Workforce Development Board and the State of California Employment Development Department
F. Approval of the allocation of $145,500 to City of Burbank’s Job Connect to provide services in Burbank as the Verdugo Jobs Center Affiliate Site for Fiscal Year 2025-2026 G. Approval of contract amendment with Glendale Youth Alliance for the Student Training and Employment Program grant to extend the end date from June 30, 2025 to June 30, 2026 and increase funding by$183,327 for an amended contract amount not to exceed $601,341, to continue administration of work experience services
H. Approval of contract amendment with Glendale Community College’s Professional Development Center for the Student Training and Employment grant to extend the end dates from June 30, 2025 to June 30, 2026, and increase funding in an amount of $13,600 for a total contract amount of $27,200
I. Approval of the Verdugo Workforce Development Board’s Preliminary Budget for Fiscal Year 2025-2026
J. Approval to designate Glendale Youth Alliance as the board’s youth provider for Fiscal Year 2025-2026 and to enter into contract with Glendale Youth Alliance for Fiscal Year 2025-2026 in an amount not to exceed $703,428 in Workforce Innovation and Opportunity Act funding for Youth Services
K. Approval to accept anticipated preliminary funds from the Los Angeles County Department of Economic Opportunity for Fiscal Year 2025-2026 for the Youth@Work program and to enter into contract with Glendale Youth Alliance to provide Youth Services L. Approval to release the Verdugo Workforce Development Board’s America’s Job Centers of California Operator Application for July 1, 2025 – June 30, 2029 for public review and comment M. Approval of Fiscal Year 2025-2026 Slate of Officers for the Verdugo Workforce Development Board
MOTION FOR CONSENT ITEM E – M Motion: Vick Brannock 2
nd: Alexis Carter
IV. Director’s Report
A. Executive Director Judith Velasco introduced Denise Hayes, a successful participant of the Verdugo Jobs Center (VJC), who obtained her Class A Driving License through Hi-Desert Trucking School and is currently working as a long-haul driver. Ms. Hayes provided a summary of her experience with the services that VJC provided to her. 53 of 348

VERDUGO WORKFORCE DEVELOPMENT BOARD

FULL BOARD MEETING MINUTES
6/25/2025
9:30 a.m. to 10:30 a.m.

VWDB Full Board Minutes 6/25/2025 Page 3 of 3

1. The VWDB applauded Ms. Hayes on her accomplishments.

2. Ms. Hayes emphasized the importance of marketing and letting the community know about the services available at VJC. If her training provider had not mentioned VJC to her, she never would have known about the services available.

B. Ms. Velasco announced the VWDB’s staff goals for the upcoming fiscal year which are:

1. Alignment with industries and partners in apprenticeships with a manufacturing focus,

2. Identify business champions,

3. Regular communication with elected local officials,

4. Diversify revenue, and

5. Develop career pathways.
a. Discussion: The board members provided feedback on the goals. i. Sonya Kay Blake advised that it is strategic to align with prevailing priorities and create an action plan for the sectors the VWDB has in mind.
ii. Stephanie O’Keefe mentioned that the concept of apprenticeships is somewhat dated and needs to be rebranded.
iii. Terry Walker added that apprenticeships can help offset expenses, if the employer took on the responsibility of training expense.
iv. Nicole Miller emphasized that constant communication with elected officials will help as well as sharing the available resources more publicly. v. Jose Barba recommended documenting the client’s story; as they meet their milestones, referencing their timeline.
vi. Vicki Brannock stated that Biocom has been trying to pitch the apprenticeship model to employers in the Biotech world, but employers are not interested. A challenge is that employers are more familiar with the internship model and are hesitant to change.

C. Ms. Velasco shared that the VWDB received an 18% increase in allocation for WIOA Adult, Dislocated Work and Youth funds.

D. Ms. Velasco disclosed that WIOA remains as status quo.

1. The Make America Skilled Again (MASA) Initiative brings the possibility of grant funds being consolidated into a block grant.
i. Currently WIOA funds flow to the state and then allocated to the boards.

E. Ms. Velasco announced that she will be reaching out to board members to schedule meetings with Local Elected Officials on MASA, request Letters of Support, and meet with board members to discuss apprenticeship models and new opportunities.

V. Other Business and Announcements
A. Ms. Velasco shared the recent awards the VWDB and VJC have received for services provided through successful partnerships.

B. The next VWDB meeting will be held in-person at the VJC on Wednesday, September 24, 2025 at 9:30 am.

II. Public Comments: None
III. Adjournment: 10:33 am
54 of 348
4f
25-88692

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Amend Professional Services Agreement (PSA) for Preparation of Design and Construction Documents for Fremont Park Renovation Project

1. Motion authorizing an amendment to PSA No. C106224 with David Volz Design Landscaping Architects, increasing the contract amount by $35,000 for a total notto-exceed amount of $1,333,214.

COUNCIL ACTION
Item Type: Consent Calendar
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
On May 20, 2025, the City Council approved an amendment to contract C106224 with David Volz Design Landscaping Architects (DVD) for project design services during the extended construction duration for the Fremont Park Renovation Project. Due to an error in the description of this contract in the staff report and approved motion, staff is unable to process this amendment. Therefore, a revised motion increasing the contract amount by $35,000 is needed with accurate financial terms of the existing contract stated, so that this PSA amendment may be processed and the associated project completed.

RECOMMENDATION
Pass a motion authorizing the City Manager to increase the amount of the PSA with DVD by $35,000 for additional project design consulting services related to the Fremont Park Renovation Project.

ANALYSIS
The Fremont Park Renovation Project is currently in the final stages of the construction phase and is expected to open in Fall 2025. The project includes a comprehensive renovation of this facility including the construction of a new community building, a new soccer field with LED lighting, new solar-covered parking canopies, and new irrigation and landscaping. DVD has been involved with this project throughout the design and construction phases providing project design support services.

On May 20, 2025, the City Council passed a motion authorizing an amendment to PSA C106224, increasing the contract amount by $35,000 for additional design support 55 of 348
4f 2
25-88692
services through the end of the construction phase. This amendment cannot be implemented because the staff report and motion both incorrectly indicated that the proposed amendment will increase the contract amount to a new not-to-exceed amount of $458,382. In actuality, the current amount of the PSA is $1,298,214, so the proposed amendment will increase the contract amount to $1,333,214.

The PSA with DVD is an older contract that was entered into prior to the City’s implementation of the Tyler Munis financial system in 2018. This contract was initiated by the Community Services and Parks Department for preliminary design services related to the project and eventually passed on to the Public Works Department when the construction phase was imminent. When contracts were transitioned from the City’s old financial system, the amounts of contracts entered at that time were only available balances and not the total contract amounts. Thus, the amount of this contract shown in the new financial system is less than its actual amount. When the May 20, 2025, staff report was prepared, staff referenced the contract amount shown in the new system.

There are still a few contracts more than seven years old that were transitioned from Peoplesoft to Tyler Munis. These contracts have distinct project numbers, which allows staff to differentiate them from contracts that were originally entered into the Tyler Munis system. Staff will be more aware of the peculiarity of older contract balances moving forward.

STAKEHOLDERS/OUTREACH
None.

FISCAL IMPACT
The additional project design services for the Fremont Park Renovation Project will cost $35,000, which was approved as a part of the FY 2025-26 budget. No new appropriation is being requested at this time. The City Council approved funding is outlined below:

Existing Appropriation
Amount Account String Funding Source
$35,000 GL: 51200-4010-CSP-0020-P0000
PL: 51873
Capital Improvement Fund

ENVIRONMENTAL REVIEW (CEQA/NEPA)
This project is Categorically Exempt under the provisions of the California Environmental Quality Act (CEQA) as a Class 2 exemption pursuant state CEQA Guidelines, Section 15302.

CAMPAIGN DISCLOSURE
The names and business addresses of the members of the board of directors, the chairperson, CEO, COO, CFO, Subcontractors and any person or entity with more than 56 of 348
4f 3
25-88692
10% interest in the company proposed for contract in this Agenda Item Report are attached in Exhibit #, in accordance with the City Campaign Finance Ordinance No. 5744.

ALTERNATIVES TO STAFF RECOMMENDATION
Do not approved the motion, which would prevent the city from receiving additional needed design work through the end of the construction phase delaying the completion of the project and potentially impairing the project outcome.

ADMINISTRATIVE ACTION
Submitted by:

Daniel Hernandez, Director of Public Works
Prepared by:

Shea Eccleston-Banwer, Public Works Administrator
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Campaign Finance Disclosure Statement
57 of 348
4f
MOTION
Moved by Council Member _______________________________________, seconded by Council Member_______________________________________, that the Council of the City of Glendale authorizes the City Manager, or his designee, to execute an amendment to Professional Services Agreement No. C106224, with David Volz Design Landscaping Architects for the Fremont Park Renovation Project – subject to approval by the City Attorney – increasing the total contract amount by thirty-five thousand dollars ($35,000) for a total not-to-exceed amount of one million three hundred thirty-three thousand two hundred fourteen dollars ($1,333,214).

Votes as follows:

Ayes:

Noes:

Absent:

Abstain:
______________________
City Clerk
58 of 348
Exhibit 1
59 of 348
60 of 348
61 of 348
62 of 348
8a
25-88603

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Local Amendments to the California Building and Energy Code to require projects in single-family homes, duplexes and townhomes involving replacement or alteration (but not repair) of an existing air conditioning system or installation of new air conditioning systems to either include a heat pump space conditioner as the primary heating system, or install specific energy efficiency measures in addition to a new air conditioner

1. Motion Directing Staff to Include Provisions in the Local Amendments to the 2025 California Building and Energy Code to Be Considered by the Council in the Fall of 2025 That Would Require Energy Conservation Measures for Air Conditioner Alterations, Replacements and Installations in Existing Single-Family Homes, Duplexes and Townhomes

2. An Ordinance of the Council of the City of Glendale, California Amending the 2022 Glendale Building and Safety Code, Volume IX (Green Building Standards), to Require Energy Conservation Measures for Air Conditioner Alterations, Replacements and Installations in Existing Single-Family Residential Buildings

COUNCIL ACTION
Item Type: Ordinance
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
On August 19, 2025, the Council introduced an ordinance - based on modified CALGreen voluntary provisions—that would amend the 2022 Glendale Building and Safety Code to require projects in single-family homes, duplexes and townhomes involving replacement or alteration (but not repair) of an existing air condition system or installation of new air conditioning systems to either include a heat pump space conditioner as the primary heating system or install specific energy efficiency measures in addition to a new air conditioner. The ordinance would require installation of a heat pump as the primary heating source; or permit the gas furnace to be retained but require installation of additional energy-efficiency upgrades where an air conditioning system (not including repair of existing systems) is being replaced or added. 63 of 348
8a 2
25-88603

At its August 26, 2025 meeting, the Council deadlocked 2-2 on adopting a proposed ordinance. Because ordinances take 30 days to become effective, the ordinance cannot be in effect by the September 30, 2025 deadline set by A.B. 130, which prohibits local amendments to state building codes after that date unless certain exceptions apply. While this eliminates one pathway for adoption, the City may still proceed under the “General Plan Exception” in Health and Safety Code section 17958(b)(5), which allows amendments aligned with a general plan adopted before June 10, 2025 and that both permit mixed-fuel residential construction and incentivize electrification as part of a greenhouse gas reduction strategy. Glendale’s 2025 General Plan Safety Element and its Greener Glendale Plan support such findings, particularly for adopting an AC2HP reach code that enhances resilience, supports climate goals, and complies with federal law. Staff therefore recommends that instead of proceeding with the current ordinance, the Council direct staff to prepare a new ordinance with the required findings for adoption alongside the 2025 Building and Safety Code later in 2025.

RECOMMENDATION
That the Council direct staff to prepare an ordinance adopting local amendments to the California Building and Safety Code that make findings in accordance with Health and Safety Code section 17958(b)(5) – relating to the City’s General Plan – and present said ordinance for consideration in conjunction with the Council’s consideration of the adoption of the 2025 Glendale Building and Safety Code.

ANALYSIS
At the regular Council meeting of August 26, 2025, after deliberating the proposed ordinance, the Council voted 2-2 on the motion to adopt the ordinance, with Councilmember Kassakhian absent. Under the Charter (Article VI, Sec. 3), “any tie vote constitutes no action, and the matter shall be carried from agenda to agenda until the tie is broken, or the council determines to remove the item from the agenda.” Thus, the proposed ordinance is on the agenda for adoption as required by the Charter. Because the ordinance will not be in effect by September 30, 2025, however, staff does not recommend the Council adopt it as it will not satisfy A.B. 130.

As noted in the Report to Council dated August 12, 2025 (“August 12 Report” – Exhibit 1”), A.B. 130, urgency legislation adopted by the Legislature and approved by the Governor, local amendments to the State building codes are prohibited after September 30, 2025, unless they fall within certain exceptions set forth in AB 130. The ordinance with the local amendments was proposed to be in effect as of September 30 if they had been adopted at the August 26, 2025 meeting. Since an ordinance require 30 days to be effective the time to adopt local amendments to be in effect as of September 30, 2025 has passed.

There is an additional pathway to adopt local amendments to the California Building and Safety Code that is applicable to this particular set of proposed amendments. The August 12 Report discussed this option:
64 of 348
8a 3
25-88603
“Option 2: Adopt the 2025 Building Standards Code (or at least the Energy Code component) using the AB 130 exception (Health & Safety Code section 17958(b)(5)) that allows for changes or modifications that “are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy.” August 12 Report, p. 5.

The August 12 Report also discussed how the City could adopt local amendments to the 2025 Building Standards Code and/or Energy Code utilizing the exception in Health and Safety Code section 17958(b)(5) (the “General Plan Exception”). The Council can make “findings make findings in conjunction with the 2025 Building Standards Code adoption that the changes qualify for each of the three components of [the General Plan Exception] as follows:

1. The reach code will align with a general plan approved on or before June 10, 2025. The City adopted the current Safety Element of the General Plan on April 1, 2025. The 2025 Safety Element, Policy 5-2: Building Resilience, specifically states that the City shall amend the building code to increase the resiliency of existing and new buildings, thereby protecting residents from the impacts of extreme heat and poor air quality. The 2025 Safety Element, Program 5-2.3, specifies that the City shall consider amending the building code to require all newly installed HVAC units for existing buildings to have two-way air conditioning unit capability to provide heating and cooling by the next CBC update cycle.

Adopting an AC2HP reach code is consistent with the 2025 General Plan Safety Element; it can help Glendale achieve its climate goals, improve public health, and modernize infrastructure.

2. The reach code is consistent with EPCA because it ‘permits mixed-fuel residential construction.’ In other words, compliance with the AC2HP reach code does not preclude a residential property owner from using natural gas, which was the issue in the Berkeley case. [Additionally, the ordinance does not require installation of the heat pump; compliance may also be achieved by installation of energy efficiency upgrades when installing, replacing or altering an air conditioning system but relying on a gas furnace for space heating.]

3. The reach code will incentivize all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. The City adopted the Greener Glendale Plan in 2012. The Greener Glendale Plan has strategies to reduce GHGs which include reduction in citywide energy consumption by facilitating permitting and construction of alternative building structures, materials and site location; retrofitting existing development for increased energy and water efficiency, and promoting and supporting use of renewable energy. The AC2HP reach code are consistent with these strategies because they can reduce 65 of 348
8a 4
25-88603
greenhouse gas emissions by replacing fossil fuel-based heating systems with electric heat pumps. Staff has reviewed studies that show AC2HP upgrades increase efficiency and are cost-effective over the system's lifecycle, especially when factoring in utility incentives and future energy savings. Electrification also reduces fire hazards associated with gas lines and appliances, enhancing community resilience.” August 12 Report, pp. 6-7.

The August 12 Report recommended that the Council consider implementation of a two-pronged “belts and suspenders” approach to complying with A.B. 130 – (1) adopt a local code amendment that would be in effect “as of September 30, 2025” which could then be readopted as part of the 2025 pursuant to AB 130 and then also make findings for the 2025 local amendments that comply with the General Plan Exception. Although the time to pass the first prong has passed, the Council may make findings under the General Plan Exception to adopt amendments to the 2025 Building and Safety Code (when the time comes in the Fall of 2025). The ordinance introduced on August 19, 2025 does not contain the full breadth of this findings that should be made to implement a reach code that complies with the General Plan Exception. Thus, staff recommends that Council direct staff to bring back an ordinance for introduction with the findings under Health and Safety Code Section 17958(b)(5) at the time the staff brings back the 2025 Building and Safety Code for adoption.

STAKEHOLDERS/OUTREACH
Staff presented draft reach code language to the August 7, 2025, Sustainability Commission meeting and received recommendations and direction from the Commission.

Staff provided a copy of the reach code model language to the Community Development Building Official and the GWP Clean Energy Officer in June 2025.

FISCAL IMPACT
There is no fiscal impact associated with this report.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
The proposed Ordinance will be exempt from review under the California Environmental Quality Act (California Public Resources Code §§15000, et seq., "CEQA"), and the regulations promulgated thereunder (14 California Code of Regulations §§15000, et seq., the "CEQA Guidelines") because it will consist of revisions and clarifications to an existing code of construction-related regulations and specification of procedures related thereto being taken for enhanced protection of the environment and while there may be added infrastructure resulting from the implementation of the Reach Codes, it does not have the potential to cause significant effects on the environment; to the contrary, the transition from fossil fuel sources is part of the State of California’s overall plan to decrease GHG emissions from stationery and transportation sources. Adoption of the Ordinance is categorically exempt in accordance with CEQA Guidelines §15305 as a minor alteration in land use limitations which do not result in any changes in land use or density and is exempt under CEQA Guidelines §15308 as an action taken by a regulatory agency as 66 of 348
8a 5
25-88603
authorized by California law to assure maintenance or protection of the environment.

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION
1) Adopt the Ordinance Amending the Glendale Building and Safety Code, Volume IX, to Adopt Local Amendments to the 2025 Edition of the California Building and Energy Code as introduced. However, the ordinance will have no legal effect as it will not comply with A.B. 130.
2) The City Council may consider any alternates not presented by staff.

ADMINISTRATIVE ACTION
Submitted by:

John Takhtalian, Assistant City Manager
Prepared by:

David Jones, Sustainability Officer
Michael J. Garcia, City Attorney
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS

1. Report to Council dated August 12, 2025

2. Report to Council dated August 19, 2025
67 of 348

M O T I O N
Moved by Council Member _________________________, seconded by Council Member ___________________________, that, with respect to the Report to Council dated September 9, 2025 (“Report”) pertaining to heat pump space conditioners, the Council hereby directs staff, in connection with the local amendments to the 2025 California Building and Energy Codes for future consideration by the Council, to include provisions to require energy conservation measures for air conditioner alterations, replacements and installations in existing single family buildings, duplexes and townhome buildings as discussed in the Report, including exhibits thereto.

Vote as follows:

Ayes:

Noes:

Absent:

Abstain:
68 of 348
1 ORDINANCE NO.

AN ORDINANCE OF THE CITY OF GLENDALE, CALIFORNIA, AMENDING THE 2022 GLENDALE BUILDING AND SAFETY CODE, VOLUME IX (GREEN

BUILDING STANDARDS), TO REQUIRE ENERGY CONSERVATION MEASURES

FOR AIR CONDITIONER ALTERATIONS, REPLACEMENTS AND INSTALLATIONS

IN EXISTING SINGLE-FAMILY RESIDENTIAL BUILDINGS
WHEREAS, this Ordinance amends the 2022 Glendale Building and Safety Code to add reach codes to Volume IX Green Building Standards that require installation of heat pumps or energy efficiency measures when air conditioners are altered, replaced or installed in existing single-family residential buildings – these standards do not apply to repair of existing AC systems; and
WHEREAS, adoption of the reach codes aligns with the City’s General Plan Safety Element, the Climate Action and Adaptation Plan (CAAP) which aims to reduce communitywide greenhouse gas emissions, and the Greener Glendale Plan; and WHEREAS, various state orders and statutes are targeted to reduction of greenhouse gas emissions, including but not limited to, Executive Order N-79-20, the Advanced Clean Cars II program which prohibits the sale of internal combustion passenger vehicles beyond 2035, and the California Green Building Standards Code which contains mandatory green building provisions, as well as a range of voluntary measures, known as CALGreen Voluntary Tier 1 and Tier 2, relating to energy efficiency and renewable energy; and
WHEREAS, California Health and Safety Code section 17958 requires cities adopt building regulations that are substantially the same as those adopted by the California Building Standards Commission and contained in the California Building Standards; and
WHEREAS, additionally, the California Energy Code is a part of the California Building Standards which implements minimum energy efficiency standards in buildings through mandatory requirements, prescriptive standards, and performances standards; and
WHEREAS, California Health and Safety Code Sections 17958.5, 17958.7 and 18941.5 allow cities to make changes or modifications to the building standards contained in the California Building Standards based upon express findings that such changes or modifications are reasonably necessary because of local climactic, geological or topographical conditions; and
WHEREAS, California Green Building Standards Code Section 101.7.1 provides that local climactic, geological or topographical conditions include environmental conditions established by a city, county, or city and county through findings; and 69 of 348
2 WHEREAS, the City Council of the City of Glendale finds that each of the amendments, additions and deletions to the California Green Building Standards Code and California Energy Code contained in this Ordinance are reasonably necessary because of local climactic, geological or topographical conditions described in Attachment “A” to this Ordinance; and
WHEREAS, California Public Resources Code Section 25402.l(h)2 and Section 10-106, of the Building Energy Efficiency Standards (Standards) establish a process which allows local adoption of energy standards that are more stringent than the statewide Standards, provided that such local standards are cost effective, and that the California Energy Commission finds that the local standards will require buildings to be designed to consume no more energy than permitted by the California Energy Code; and
WHEREAS, the cost effectiveness studies prepared by the California Statewide Investor Owned Utilities Codes and Standards Program, and which are attached to the August 19, 2025 staff report demonstrate that the local amendments are cost-effective and do not result in buildings consuming more energy than is permitted by the 2022 California Energy Code or the upcoming 2025 Code updates which will be adopted before the end of 2025 of which these amendments will become a part based on findings the Council will make in compliance with AB 130; and WHEREAS, the proposed reach code was proposed for consideration as a local amendment to the 2022 California Energy Code at an August 12, 2025 City Council meeting, pursuant to which direction was given to bring this Ordinance forward for introduction; and
WHEREAS, following adoption of this Ordinance the local amendments to the 2022 California Energy Code as amended into the 2022 Glendale Building and Safety Code will, in accordance with Public Resources Code Section 25402.1(h)(2) and Section 10-106 of the 2022 California Administrative Code (Title 24, Part 1), be submitted to the California Building Standards Commission for filing and will be submitted to the California Energy Commission for approval.

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GLENDALE:

SECTION 1. RECITALS
The City Council finds the foregoing recitals to be true and correct and hereby incorporates those recitals into this Ordinance.

SECTION 2. PURPOSE AND INTENT
It is the purpose and intent of this Ordinance to adopt the local amendments to the 2022 California Energy Code (Title 24, Part 6 and Part 11) that provide local, cost effective standards for existing residential, that exceed the minimum standards of the 2022 California Energy Code and 2022 California Green Building Standards Code to achieve energy savings, reduce local pollution, reduce greenhouse gas emissions, and address 70 of 348
3 71 of 348
3 unique local climactic, geological, and topographical conditions. The requirements of this chapter shall not affect any other state or local requirements related to the delivery of affordable housing, including but not limited to state and local density bonus requirements under Government Code Section 65915 et seq. and G.M.C Chapter 4.11, Chapter 30.35 and Chapter 30.36. Furthermore, nothing in this local amendment negates the requirement of new construction to comply with State code minimums.

SECTION 3. LOCAL AMENDMENTS TO ENERGY CODE
Volume IX (Green Building Standards) of the 2022 Glendale Building and Safety Code, is hereby amended as follows:

A4.204.1 Energy Efficiency. Alterations to existing residential buildings shall comply with Section A4.204.1.1.

A4.204.1.1 Altered Space-Conditioning System Serving Existing Single-Family Dwelling Units – Mechanical Cooling. When a space-conditioning system serving an existing single-family dwelling unit is altered in climate zones 1 through 14 and 16 by installation or replacement of an air conditioner, the altered system shall comply with either a or b below in addition to the requirements for installation specified by Title 24, Part 6, Sections 150.2(b)1E and 150.2(b)1F:
a. A heat pump shall be the primary heating source and sized according to the system selection requirements specified by Title 24, Part 6 of Section 150.0(h)5.

Supplemental heating may be provided by gas furnace or electric resistance heating as specified in Title 24, Part 6, Sections 150.0(h)7 and 150.0(i); or b. An air conditioner shall meet all the requirements in either subsection I or II below:

I. Systems with Existing Duct Distribution Systems:

A. The duct system measured air leakage shall be equal to or less than 10 percent of the system air handler airflow as confirmed through field verification and diagnostic testing, per the requirements in Title 24, Part 6, Reference Residential Appendix Section RA3.1.4.3.1; and Exception 1 to A4.204.1.1bIA. If it is not possible to meet the duct sealing requirements, all accessible leaks shall be sealed and verified through a visual inspection and a smoke test by a certified ECC-Rater utilizing the methods specified in Reference Residential Appendix Section RA3.1.4.3.5.

Exception 2 to A4.204.1.1bIA: Existing duct systems, constructed, insulated or sealed with asbestos.

B. Demonstrate, in every control mode, airflow greater than or equal to 300 CFM per ton of nominal cooling capacity through the return grilles, and an air-handling unit fan efficacy less than or equal to 0.45 W/CFM. The 72 of 348
4 airflow rate and fan efficacy requirements in this section shall be confirmed through field verification and diagnostic testing, following the procedures outlined in Title 24, Part 6, Reference Residential Appendix RA3.3; and Exception 1 to A4.204.1.1bIB: Systems unable to comply with the minimum airflow rate and system efficacy requirements shall demonstrate compliance by satisfying all of the following:

1. Following the procedures in Section RA3.3.3.1.5;

2. Installing a system thermostat that conforms to the specifications in Section 110.12;

3. For standard ducted systems (without zoning dampers), meet the applicable minimum total return filter grille nominal area requirements in Table 150.0-B or 150.0-C as confirmed by field verification and diagnostic testing in accordance with the procedures in Reference Residential Appendix Sections RA3.1.4.4 and RA3.1.4.5. The design clean-filter pressure drop requirements specified by Section 150.0(m)12D for the system air filter(s) shall conform to the requirements given in Tables 150.0-B and 150.0-C.

Exception 2 to Section A4.204.1.1bIB: Multispeed compressor systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) for system operation at the maximum compressor speed and the maximum air handler fan speed.

Exception 3 to Section A4.204.1.1bIB: Gas furnace air-handling units manufactured prior to July 3, 2019 shall comply with a fan efficacy value less than or equal to 0.58 W/cfm as confirmed by field verification and diagnostic testing in accordance with the procedures given in Reference Residential Appendix RA3.3.

C. In all climate zones, refrigerant charge verification requirements shall meet the requirements in Title 24, Part 6 Section 150.2(b)1Fiib, including the minimum airflow rate specified in Section 150.2(b)1Fiia; and D. Vented attics shall have insulation installed to achieve a U-factor of 0.020 or insulation installed at the ceiling level shall result in an insulated thermal resistance of R-49 or greater for the insulation alone; luminaires not rated for insulation contact must be replaced or retrofitted with a fireproof cover that allows for insulation to be installed directly over the cover; and Exception 1 to Section A4.204.1.1(b)ID: Dwelling units with at least R-38 existing insulation installed at the ceiling level.

Exception 2 to Section A4.204.1.1(b)ID: Dwelling units where the alteration would directly cause the disturbance of asbestos unless the alteration is made in conjunction with asbestos abatement. 73 of 348
5 Exception 3 to Section A4.204.1.1(b)ID: Dwelling units with knob and tube wiring located in the vented attic.

Exception 4 to Section A4.204.1.1(b)ID: Where the accessible space in the attic is not large enough to accommodate the required R-value, the entire accessible space shall be filled with insulation provided such installation does not violate Section 806.3 of Title 24, Part 2.5.

E. Air seal all accessible areas of the ceiling plane between the attic and the conditioned space including all joints, penetrations and other openings that are potential sources of air leakage by caulking, gasketing, weather-stripping or otherwise sealing to limit infiltration and exfiltration.

Exception 1 to Section A4.204.1.1bIE: Dwelling units with at least R-38 existing insulation installed at the ceiling level.

Exception 2 to Section A4.204.1.1 bIE: Dwelling units where the alteration would directly cause the disturbance of asbestos unless the alteration is made in conjunction with asbestos abatement.

Exception 3 to Section A4.204.1.1bIE: Dwelling units with atmospherically vented space heating or water heating combustion appliances located inside the pressure boundary of the dwelling unit.

II. Entirely New or Complete Replacement Duct Systems:

A. R-8 duct insulation shall be installed for all new ducts located in unconditioned space; and
B. The total duct system measured air leakage shall be equal to or less than 5 percent of the system air handler airflow as confirmed through field verification and diagnostic testing, per the requirements in Title 24, Part 6, Reference Residential Appendix Section RA3.1.4.3.1; and C. Demonstrate, in every control mode, airflow greater than or equal to 350 CFM per ton of nominal cooling capacity through the return grilles, and an air-handling unit fan efficacy less than or equal to 0.35 W/CFM. The airflow rate and fan efficacy requirements in this section shall be confirmed through field verification and diagnostic testing, following the procedures outlined in Title 24, Part 6, Reference Residential Appendix RA3.3; and D. In all climate zones, refrigerant charge verification requirements shall meet the requirements in Title 24, Part 6 Section 150.2(b)1Fiib; and E. In Climate Zones 1-4, 6, and 8-16 if the air handler and ducts are located within a vented attic, vented attics shall have insulation installed to achieve a 74 of 348
6 U-factor of 0.020 or insulation installed at the ceiling level shall result in an insulated thermal resistance of R-49 or greater for the insulation alone; luminaires not rated for insulation contact must be replaced or retrofitted with a fireproof cover that allows for insulation to be installed directly over the cover; and
Exception 1 to Section A4.204.1.1bIIE: In Climate Zones 1, 3, and 6, dwelling units with at least R-19 existing insulation installed at the ceiling level.

Exception 2 to Section A4.204.1.1bIIE: Dwelling units where the alteration would directly cause the disturbance of asbestos unless the alteration is made in conjunction with asbestos abatement.

Exception 3 to Section A4.204.1.1bIIE: Dwelling units with knob and tube wiring located in the vented attic.

Exception 4 to Section A4.204.1.1bIIE: Where the accessible space in the attic is not large enough to accommodate the required R-value, the entire accessible space shall be filled with insulation provided such installation does not violate Section 806.3 of Title 24, Part 2.5.

F. In Climate Zones 2, 4, and 8-16, air seal all accessible areas of the ceiling plane between the attic and the conditioned space including all joints, penetrations and other openings that are potential sources of air leakage by caulking, gasketing, weather-stripping or otherwise sealing to limit infiltration and exfiltration.

Exception 1 to Section A4.204.1.1bIIF: Dwelling units with at least R-19 existing insulation installed at the ceiling level.

Exception 2 to Section A4.204.1.1bIIF: Dwelling units where the alteration would directly cause the disturbance of asbestos unless the alteration is made in conjunction with asbestos abatement.

Exception 3 to Section A4.204.1.1bIIF: Dwelling units with atmospherically vented space heating or water heating combustion appliances located inside the pressure boundary of the dwelling unit.

Exception 1 to Section A4.204.1.1: Where the capacity of the existing main electrical service panel is insufficient to supply the electrical capacity of a heat pump and where the existing main electrical service panel is sufficient to supply a new or replacement air conditioner, as calculated according to the requirements of California Electrical Code Article 220.83 or Article 220.87. Documentation of electrical load calculations in accordance with Article 220 must be submitted to the enforcement agency prior to permitting for both the heat pump and proposed air conditioner. 75 of 348
7 Exception 2 to Section A4.204.1.1: Where the required capacity of a heat pump to meet the system selection requirements of Section 150.0(h)5 is greater than or equal to 12,000 Btu/h more than the greater of the required capacity of an air conditioner to meet the design cooling load OR the capacity of the existing air conditioner. Documentation of heating and cooling load calculations in accordance with 150.0(h) must be submitted to the enforcement agency prior to permitting for both the heat pump and proposed air conditioner.

SECTION 4. Severability.

This Ordinance’s provisions are severable. If any portion of this Ordinance or its application to any person or circumstance is held invalid or unconstitutional, that decision does not affect the validity of the Ordinance’s remaining portions and the Ordinance’s application to other persons and circumstances. The City Council declares that it would have passed the remainder of this Ordinance without the invalid or unconstitutional provision.

SECTION 5. CEQA Findings.

The City Council finds and determines that this Ordinance is exempt from review under the California Environmental Quality Act (California Public Resources Code §§15000, et seq., "CEQA"), and the regulations promulgated thereunder (14 California Code of Regulations §§15000, et seq., the "CEQA Guidelines") because it consists of revisions and clarifications to an existing code of construction-related regulations and specification of procedures related thereto being taken for enhanced protection of the environment and while there may be added infrastructure resulting from the implementation of the Reach Codes, it does not have the potential to cause significant effects on the environment; to the contrary, the transition from fossil fuel sources is part of the State of California’s overall plan to decrease GHG emissions from stationary and transportation sources. Adoption of the Ordinance is categorically exempt in accordance with CEQA Guidelines §15305 as a minor alteration in land use limitations which do not result in any changes in land use or density and is exempt under CEQA Guidelines §15308 as an action taken by a regulatory agency as authorized by California law to assure maintenance or protection of the environment.

SECTION 6. Effective Date.

This Ordinance shall take effect and be in force thirty (30) days after the date of its passage.

SECTION 7. Certification.

The City Clerk is directed to certify the passage and adoption of this Ordinance; cause it to be entered into the City’s book of original ordinances; make a note of the passage and adoption in the records of this meeting; and within fifteen (15) days after the passage and adoption of this Ordinance, cause it to be published or posted in accordance with California law.
76 of 348
8 Adopted by the Council of the City of Glendale on the day of , 2025.

Mayor
ATTEST:

City Clerk

STATE OF CALIFORNIA )
) SS.

COUNTY OF LOS ANGELES )
I, Dr. Suzie Abajian, City Clerk of the City of Glendale, hereby certify that the foregoing Ordinance was adopted by the Council of the City of Glendale, California, at a regular meeting held on the day of , 2025, and that
the same was adopted by the following vote:

Ayes:

Noes:

Absent:

Abstain:

City Clerk
77 of 348
9 Attachment A:

Local climactic, geological or topographical conditions

1. Reach Code requiring AC2HP Replacement
Finding No. 1: Climactic:

The burning of fossil fuels used to heat structures, heat water for cooking, and for other uses is a significant contributor to greenhouse gas emissions and climate change.

Combustion of natural gas and petroleum products for heating and cooking emit carbon dioxide, methane, and nitrous oxide. Emissions from natural gas consumption represented 46% of total annual U.S. energy-related CO2 emissions in 20211. Scientists attribute the global warming trend observed since the mid-20th century to the human expansion of the ‘greenhouse effect’ warming that results when the atmosphere traps heat radiating from Earth towards space. Long lived gasses such as carbon dioxide can persist in the atmosphere for more than 100 years, even with efforts to reduce emissions today. Nitrous oxide, carbon dioxide, and methane are gases that contribute to the greenhouse gas effect2.

Global climate change imposes substantial local impacts and risks on the Los Angeles Area, and thus the City of Glendale, including rising temperatures, changing precipitation patterns and amounts, sea level rise, flooding, drought, and wildfire. A general summary of climate risks facing the Los Angeles Area and City of Glendale are as follows:
• Increased temperatures and extreme heat events. The Los Angeles region is expected to experience an increase in average maximum temperatures of 4-5 degrees Fahrenheit by mid-century, and 5-8 degrees Fahrenheit by late-century, with the duration and intensity of extreme heat events increasing as well. • Changes in Rainfall Intensity. By mid-century, more precipitation is projected to occur in winter in the form of less frequent but larger events. Most climate models predict drying trends across the State by 2100.
• Increased Risk of Large Wildfires. A hotter, drier climate is projected to increase wildfires across southern California, though there remains some uncertainty in quantifying future changes of burned area in the region. • Exacerbation of Air Quality Problems. If temperatures rise to the medium warming range, there could be 75% to 85% more days with weather conducive to ozone formation, relative to today’s conditions. This is more than twice the increase expected if rising temperatures remain in the lower warming range. This 1 U.S. Energy Information Administration, Where Greenhouse Gases Come From, 2021. https://www.eia.gov/energyexplained/energy-and-the-environment/where-greenhouse-gases-comefrom.php#:~:text=In%202021%2C%20petroleum%20accounted%20for,energy%2Drelated%20CO2%20emissions. 2 NASA, Causes of Climate Change, as of November 25, 2020, https://climate.nasa.gov/causes/. 4 NASA, Causes of Climate Change, as of November 25, 2020, https://climate.nasa.gov/causes/. 78 of 348
10 increase in air quality problems could result in an increase in asthma and other health-related problems.
• Sea Level Rise. 1-2 feet of sea level rise is projected by the mid-century, and most extreme projections lead to 8-10 feet by the end of the century, especially affecting LA County as a whole5.

An AC2HP program has a significant positive effect on energy resource efficiency, waste and pollution generation, and the health of building occupants over the life of the building. As a result of the high temperatures, which are expected to rise in the future due to the effects of climate change, average load demand and peak load demand of energy used in Glendale are important factors impacting public safety and creating the potential for adverse economic impacts due to power outages or power reductions (i.e. “brownouts”). Reduction of total and peak energy use because of incremental conservation measures required by this Ordinance will have local benefits in the additional available system energy capacity. Furthermore, the reduction of greenhouse gas emissions from all-electric buildings will help mitigate climate change and its negative effects such as extreme heat, droughts, intense storms, and flooding, thus making these amendments reasonably necessary because of local climactic reasons.

Finding No. 2: Geologic
• The Los Angeles area is densely populated and located in an area of high seismic activities. Concern for fire-life safety associated with gas appliances and associated piping located in the ground and in buildings increases with the risk of explosion or fire if there is a structural failure due to a seismic event considering the increasing number of buildings in the region. • The risk of natural gas infrastructure and pipeline explosions and fires are magnified in cases of major earthquakes, for example, the 2010 San Bruno pipeline explosion.
o Severe seismic events could disrupt communications, damage gas mains, and place increased demands on the dispersed resources of the Fire Department necessary for the life safety needs of the community
• Reducing gas infrastructure in existing single family units will also reduce the risks of fires and explosions, particularly after seismic events, which will further save the City money by reducing disaster response and recovery costs
The elimination of gas infrastructure in future construction will reduce risk of geologic risk via natural gas infrastructure, making these amendments necessary because of local geologic/ seismic reasons.
5 California’s Fourth Climate Change Assessment, Los Angeles Regional Report, 2018. https://www.energy.ca.gov/sites/default/files/2019-11/Reg%20Report-%20SUM-CCCA4-2018- 007%20LosAngeles_ADA.pdf.
79 of 348
9c
25-88496

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Residential Air Conditioner to Heat Pump Replacement (AC2HP) Reach Code.

1. Motion directing staff to prepare and return to introduce a reach code for existing single-family buildings that would require installation of a heat pump as the primary heating source, or other energy conservation improvements, in cases where an existing air conditioning system is altered or replaced, or where an air conditioning system is added.

COUNCIL ACTION
Item Type: Action Item
Approved for August 12, 2025 calendar

EXECUTIVE SUMMARY
The City of Glendale has developed and implemented a series of “Reach Codes” designed to advance building electrification, photovoltaic (PV) deployment, and electric vehicle (EV) infrastructure. These codes go beyond minimum state requirements and aim to reduce greenhouse gas (GHG) emissions, improve public health, and modernize building systems.

In 2022, Glendale adopted Reach Codes requiring all-electric construction for new buildings, including ADUs, with limited exemptions; PV systems for new non-residential and multifamily buildings; and EV charging infrastructure for a range of new residential and non-residential construction.

However, due to a 2023 federal court decision striking down Berkeley’s natural gas ban for violating the federal Energy Policy and Conservation Act (EPCA), Glendale suspended enforcement of the all-electric new construction requirement in June 2024 while continuing to enforce PV and EV provisions. In April 2025, the City Council directed staff to evaluate a new reach code referred to as the Air Conditioner to Heat Pump (AC2HP) Reach Code applicable to existing single-family homes. 80 of 348
9c 2
25-88496
This proposed reach code specifies that when an air conditioning (AC) system is replaced or added, the homeowner must either:

1. Install a heat pump as the primary heating source; or

2. Implement alternative energy conservation upgrades, such as improved insulation, air sealing, and duct sealing.

The proposed reach code would not preclude mixed-fuel residential construction in violation of federal law.

Legal and Timing Considerations
Due to the passage of AB 130 in June 2025, commencing on September 30, 2025, AB 130 limits cities and counties from adopting local amendments (such as this reach code) to the residential building code through 2031, except under certain limited conditions. In light of these limitations, cities seeking to implement reach codes have the option of amending the existing 2022 Building Standards Code to add the new reach code before September 30, 2025, and later include the reach code in the 2025 Building Standards Code being adopted later this year based on the reach code being “substantially equivalent” to prior changes that were “in effect” as of September 30, 2025.

The second option is to include the proposed reach code in the 2025 Building Standards Code adoption process scheduled to occur before the end of 2025. The second option requires the City to show that the proposed changes are: i) “necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025”, ii) that “permits mixed fuel residential construction consistent with federal law”, e.g. compliance with the federal Energy Policy and Conservation Act, and iii) incentivizes “all-electric construction as part of an adopted greenhouse gas emissions reduction strategy”.

Since AB 130 is new law, both these options are based on our current understanding of AB 130, but are untested. With respect to Option 1 (amending the 2022 Building Standards Code), there is time to introduce and adopt the reach code by August 26, 2025; however, if the reach code is scheduled for adoption after August 30, 2025, it would need to be adopted on an urgency basis in order to be effective before September 30, 2025.
81 of 348
9c 3
25-88496

RECOMMENDATION
The City Council direct staff to prepare and introduce a reach code for existing singlefamily homes that would require installation of a heat pump as the primary heating source, or other energy conservation improvements, in cases where an existing air conditioning system is altered or replaced, or where an air conditioning system is added.

ANALYSIS
In 2022, the City hired Rincon Consultants to develop building electrification, photovoltaic (PV), and electric vehicle (EV) charging Reach Codes, which were adopted through a local amendment to the 2022 California Building and Energy Code.

The reach codes required the following:

1. Building Electrification: All new construction (including standalone accessory dwelling units (ADUs)) must be all-electric with limited exemptions and subject to an infeasibility waiver.

2. PV Infrastructure: Require non-residential and multifamily PV systems to be installed on all new buildings to offset 100 percent of projected electricity use or cover at least 50 percent of rooftop space and include an infeasibility waiver for projects unable to meet the requirement due to shading or other technical constraints.

3. EV Charging Infrastructure: Require EV charging infrastructure for new singleand multifamily dwellings, townhouses with attached private garages, multifamily dwellings with residential parking facilities, and new non-residential construction, with limited exceptions and subject to an infeasibility waiver.

At the November 1, 2022, City Council meeting, the ordinance was introduced with modifications to specific definitions and the EV infeasibility waiver process. The City Council subsequently adopted the Reach Code ordinance on November 15, 2022.

In 2019, the California Restaurant Association (CRA) sued the City of Berkeley over its ordinance banning the use of fuel gas piping in new buildings. A three-judge panel of the 9th Circuit Federal Appeals Court struck down Berkeley's ordinance in April 2023, agreeing with the CRA that the city overstepped the federal Energy and Policy Conservation Act when it passed the ban in 2019.

In 2024, the 9th Circuit declined to reconsider the decision rejecting the Berkeley, California, natural gas ban. As a result, several Cities that had natural gas bans or ordinances for new construction either halted the enforcement of the ordinance, considered alternatives, or continued with enforcement. 82 of 348
9c 4
25-88496
In response to the 9th Circuit's decision, on June 4, 2024, the City Council directed staff to suspend enforcement of those portions of Ordinance No. 5999 that require all newly constructed buildings in Glendale to be "All-Electric." All other provisions of Ordinance No. 5999, including but not limited to those pertaining to photovoltaic requirements and EV charging, as well as all requirements in the California Building Code and/or the California Energy Code regarding electric readiness, continue to be enforced.

In April 2025, the City Council requested that staff prepare a report on the potential for adopting a reach code that requires installation of either a heat pump as the primary heating source or make other energy conservation improvements for existing singlefamily buildings in which an existing air conditioning system is altered or replaced, or where an air conditioning system is added.

State Law Requirements
The California Building Standards Code (CBSC), also known as Title 24 of the California Code of Regulations, is a comprehensive set of regulations that govern building design and construction in California (“Title 24”). It encompasses various parts that address different aspects, including building, residential, electrical, mechanical, plumbing, energy, fire, and green building standards. The CBSC is periodically updated, with the 2025 edition published on July 1, 2025, and effective January 1, 2026.

The code proposed by the State, or the base code, includes several provisions related to energy efficiency and electrification readiness for new single-family residential construction that will take effect regardless of any action by the City. These include:
 Heat pumps for space conditioning and water heating
 Solar requirements;
 Battery readiness;
 Electric vehicle (EV) charging readiness;
 Pre-wiring for electric appliances when installing gas; and  Higher minimum energy performance scores.

The California Health and Safety Code enables local jurisdictions to modify the base code and adopt different or more restrictive requirements with the caveat that the local modifications must be substantially equivalent to, or more stringent than, the building standards published in the CBSC; the local jurisdiction is required to make findings that such changes are reasonably necessary because of local geological, climatic or topographic conditions; and adopt a determination that the amendments will be costeffective. 83 of 348
9c 5
25-88496
Newly adopted State legislation (AB 130) and Critical Timing Impacting Adoption of Local Reach Code Amendments to the Residential Building Code On June 30, 2025, the Legislature adopted, and the Governor signed into law, Assembly Bill (AB) 130 (formerly AB 306); AB 130 became immediately effective.

Among other things, AB 130 restricts local jurisdictions from adopting local amendments to the residential building code for the next two code cycles, between October 1, 2025, and June 1, 2031, subject to six (6) limited exceptions, including changes related to home hardening and health safety, or where the changes are “substantially equivalent” to changes previously adopted that “were in effect” as of September 30, 2025, or where there is consistency with certain general plan policies.

The City Attorney's Office has reviewed the various implications of AB 130, including on how the City may proceed with adopting an AC2HP reach code. As indicated above, the City may as part of the 2025 Building Standards Code adopt a reach code that encourages the use of a heat pump or dual-fuel system, which includes a heat pump combined with a furnace, when an air conditioner is replaced or installed in existing single-family homes if the proposed local changes are “substantially equivalent to changes or modification that were previously filed [with the California Building Standards Commission] by the governing body of the city or county and were in effect as of September 30, 2025” (Emphasis added).(AB 130, Section 29, amending Health & Safety Code §17958(b)(1)). However, to meet the “substantially equivalent” standard, the City would first need to amend the existing 2022 Building Standards Code as follows:

Option 1: Amend the existing 2022 Building Standards Code to add the reach code so that it “will be in effect” before September 30, 2025. Then, when the City adopts the 2025 Building Standards Code later this year, the City can use an AB 130, exception (Health & Safety Code section 17958(b)(1)) to adopt the reach code as part of the 2025 Building Standards Code (Energy Code component) with a finding that “substantially equivalent” to the one in effect before September 30, 2025. (Exception No. 1)
Option 2: Adopt the 2025 Building Standards Code (or at least the Energy Code component) using the AB 130 exception (Health & Safety Code section 17958(b)(5)) that allows for changes or modifications that “are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy.” (Exception No. 5) 84 of 348
9c 6
25-88496
It is important to note that the reach code would be submitted simultaneously to both the CEC and CBSC. The reach code could not be enforced until CEC and CBSC approval is obtained. Typically, the California Energy Commission (CEC) would review and approve proposed amendments before they are submitted to the CBSC for review and approval. However, there is no statutory requirement that local energy standards must be first filed with and approved by the CEC, and there are no statutory regulations that appear to preclude filing the proposed local changes with the CEC and CBSC at the same time. Importantly, CBSC “approval” is not required in order for the CEC approved local changes to become effective, but the CBSC approval is required before the local jurisdiction can enforce the new local standards.

The AC2HP Reach Code Could Comply with two of the AB 130 Exceptions A “belt and suspenders” approach would be to amend the 2022 Building Standards Code to include the new reach code and “readopt” the reach codes as part of the 2025 Building Standards Code based on the “substantially equivalent” finding (Exception No. 1 discussed above), and also make findings in conjunction with the 2025 Building Standards Code adoption that the changes qualify for each of the three components of Exception No. 5 as follows:

1. The reach code will align with a general plan approved on or before June 10, 2025. The City adopted the current Safety Element of the General Plan on April 1, 2025. The 2025 Safety Element, Policy 5-2: Building Resilience, specifically states that the City shall amend the building code to increase the resiliency of existing and new buildings, thereby protecting residents from the impacts of extreme heat and poor air quality. The 2025 Safety Element, Program 5-2.3, specifies that the City shall consider amending the building code to require all newly installed HVAC units for existing buildings to have two-way air conditioning unit capability to provide heating and cooling by the next CBC update cycle. Adopting an AC2HP reach code is consistent with the 2025 General Plan Safety Element; it can help Glendale achieve its climate goals, improve public health, and modernize infrastructure.

2. The reach code is consistent with EPCA because it “permits mixed-fuel residential construction”. In other words, compliance with the AC2HP reach code does not preclude a residential property owner from using natural gas, which was the issue in the Berkeley case.

3. The reach code will incentivize all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. The City adopted the Greener Glendale Plan in 2012. The Greener Glendale Plan has strategies to reduce GHGs which include reduction in citywide energy consumption by facilitating permitting and construction of alternative building structures, materials and site 85 of 348
9c 7
25-88496
location; retrofitting existing development for increased energy and water efficiency, and promoting and supporting use of renewable energy. The AC2HP reach code are consistent with these strategies because they can reduce greenhouse gas emissions by replacing fossil fuel-based heating systems with electric heat pumps. Staff has reviewed studies that show AC2HP upgrades increase efficiency and are cost-effective over the system's lifecycle, especially when factoring in utility incentives and future energy savings. Electrification also reduces fire hazards associated with gas lines and appliances, enhancing community resilience.

How AC2HP works: Basic Principle
A two-way heat pump operates on the principle of the refrigeration cycle, utilizing a compressor, expansion valve, refrigerant, and two heat exchangers (one located indoors and one outdoors). It operates in two modes:

Cooling Mode (like an air conditioner)

1. Indoor Air is Warm: Warm indoor air is blown over the indoor coil, where the refrigerant absorbs heat.

2. Refrigerant is Compressed: The refrigerant is then compressed, raising its temperature and pressure.

3. Heat is Released Outside: The hot refrigerant travels to the outdoor coil, where it releases heat into the outdoor air.

4. Cooled Air Returned Indoors: The refrigerant cools down, flows back indoors, and the cycle repeats.

Result: Heat is removed from the inside and expelled outdoors, cooling a home.

Heating Mode (reverse operation). A reversing valve flips the direction of refrigerant flow.

1. Outdoor Air is Cool. Even in cold air, there's thermal energy. The refrigerant in the outdoor coil absorbs this heat.

2. Refrigerant is Compressed: The refrigerant is compressed, causing a significant increase in its temperature.

3. Heat is Released Indoors: The hot refrigerant flows to the indoor coil, releasing its heat to warm your home.

4. Cycle Repeats: Cooled refrigerant flows back outside to pick up more heat.

Result: Heat is extracted from outdoor air and transferred indoors, heating a home. 86 of 348
9c 8
25-88496
Key Components
 Compressor: Pressurizes the refrigerant to move heat.  Reversing Valve: Switches the direction of refrigerant flow between heating and cooling modes.
 Expansion Valve: Reduces refrigerant pressure before it enters the evaporator coil.
 Coils: Act as evaporators or condensers depending on the mode.

Diagram 1: Heat Pump Process
Ordinance Pathways
The ordinance structure is based on the voluntary requirements adopted in 2025 Title 24, Part 11, California Green Building Standards Code (CALGreen), Section A4.204.1.1 for heat pump space conditioning alterations in single-family homes (California Energy Commission, 2025). The heat pump path requires the heat pump as the primary heat source, with backup heating allowable, either provided by electric resistance or natural gas. In cases where the existing furnace remains, the heat pump is installed alongside the existing furnace, with integrated controls that allow the furnace to provide backup heating. In alignment with the 2025 Energy Code requirements, the heat pump must be sized to meet the heating load at the design heating temperature without requiring backup heat. The proposed ordinance provides alternative pathways for residents who prefer to replace their air conditioner with similar equipment, combined with additional efficiency measures, rather than migrating to a heat pump system.

The proposed ordinance applies to existing single-family homes and triggers when:

1. An existing A/C system is altered or replaced, or

2. A new air conditioning (A/C) system is installed where none previously existed. 87 of 348
9c 9
25-88496
Projects meeting these criteria must either:

1. Install a heat pump system as the primary source of space heating, OR

2. Implement a set of alternative energy conservation measures, such as:
a. Sealing ductwork to limit air leakage
b. Establish Airflow requirements
c. Improving ceiling insulation (e.g., to R-49)
d. Performing refrigerant charge verification
e. Air sealing the building envelope
f. Installing energy-efficient fan systems and thermostats Exceptions are provided for circumstances such as:
 Insufficient electrical panel capacity to support heat pump installation  Oversized heating load that cannot be reasonably met with a heat pump  Existing hazards such as asbestos or knob-and-tube wiring AC Pathways for Heat Pump Replacements
Figure 1 illustrates two AC pathways: one with an existing duct system and another with a new duct system, alongside the heat pump pathways. The figure presents the proposed efficiency upgrade measures that would be part of a reach code (solid blue) along with the relevant requirements from Title 24, Part 6 that are triggered as part of equipment replacements (white or gradient blue). A reach code that establishes requirements when an air conditioner is replaced or a new one is installed could allow for either a heat pump to be installed or an AC, as long as the performance measures listed below are met.

Diagram 2: Heat Pump Pathways
88 of 348
9c 10
25-88496
Costs
The California Codes and Standards (C&S) Reach Codes program, also known as the Local Energy Codes program, provides technical support to local governments considering adopting a local ordinance (reach code) intended to support meeting local and/or statewide energy efficiency and greenhouse gas (GHG) reduction goals. The program facilitates adoption and implementation of the code when requested by local jurisdictions by providing resources such as cost-effectiveness studies, model language, sample findings, and other supporting documentation.

These studies aim to ensure that the requirements do not result in buildings consuming more energy than permitted by the State's minimum standards. The analysis includes scenarios of compliance packages, options, and cost-effectiveness for all California climate zones. It evaluates building prototypes to assess the cost-effectiveness of proposed changes to Title 24 requirements. Staff have provided the Local Energy Codes team with the GWP residential electric rates, L-1-A Standard Service Rates, to undertake a cost-effectiveness study.

Cost Effective Study Results
The study (exhibit 1) analyzes the cost-effectiveness of heat pump space heater measure upgrades in existing single-family buildings that exceed the minimum state requirements under the 2025 Building Energy Efficiency Standards. 89 of 348
9c 11
25-88496
The Local Energy Codes Team assessed the incremental costs and savings of the packages over the lifecycle of 30-years. Incremental costs represent the equipment, installation, replacement, and maintenance costs of the proposed measure relative to the 2025 Energy Code minimum requirements or standard industry practices. The following scenarios were evaluated.

1. Dual Fuel Heat Pump (DFHP Existing Furnace): Replace existing ducted AC with an electric heat pump and install controls to operate the heat pump as the primary space conditioning source and to use the existing gas furnace (78 AFUE) for backup heat when heating demands cannot be met by the heat pump. In this report, dual fuel heat pumps were modeled to disable furnace operation above an outdoor temperature of 35°F in compliance with Energy Code Section 150.0(h)7, which requires this lockout for any heat pump with supplemental heating.

2. HPSH: Replace existing ducted AC and natural gas furnace with an electric heat pump and air handler. Minimum federal efficiency.

3. High Efficiency HPSH: Replace existing ducted AC and natural gas furnace with an electric heat pump and air handler. Higher efficiency.

The primary objective of the evaluation is to identify cost-effective energy upgrade measures at the time of air conditioner replacement in single family buildings, to support the design of local ordinances requiring upgrades, which may be triggered by different events, such as at the time of a significant remodel or at burnout of mechanical equipment. Table 10 shows the analysis results for Climate Zone 9 for the standard rate L-1-A rate.

Results Summary
This analysis evaluated the feasibility and cost-effectiveness of heat pump upgrades at time of air conditioner replacement in GWP territory for homes built before 2010. The Statewide Reach Codes Team used both On-Bill and LSC-based LCC approaches to evaluate cost-effectiveness and quantify the energy cost savings associated with 90 of 348
9c 12
25-88496
energy efficiency measures compared to the incremental costs associated with the measures.

Conclusions and Discussion:
 The heat pump installation alongside the existing furnace (DFHP Existing Furnace) was found to be cost-effective under the high gas escalation and LSC cost-effective in all vintages.
 The complete heat pump system installation (heat pump and air handler – HPSH) was found to be cost-effective under the high gas escalation and LSC cost-effective in all vintages.
 The complete heat pump system installation with high efficiency heat pump was found to be cost-effective under the high gas escalation in the pre-1978 vintage and LSC cost-effective in all vintages, with exception to the 1992-2010 vintage.  Under the modest gas escalation scenario, only the DFHP Existing Furnace in the 1978-1991 and 1992-2010 vintages were found to be cost-effective.  Challenges to On-Bill cost-effectiveness include higher first costs and higher firstyear utility costs due to higher electricity tariffs relative to gas tariffs. However, On-Bill cost-effectiveness improves under GWP rates compared to SCE rates, primarily because GWP electricity rates are lower.

Estimated Greenhouse Gas Emissions Impacts
Assumptions: CA grid average emissions (0.25 kg CO₂/kWh), natural gas (5.3 kg CO₂/therm), usage based on average SFH demand.

Table 6: GHG Emissions Comparison
System Type Annual CO₂ Emissions 15-Year Total
Heat Pump (ASHP) 800 – 1,200 kg 12,000 – 18,000 kg
Gas Furnace + AC 2,000 – 3,200 kg 30,000 – 48,000 kg
Incentives available across the U.S., combining federal, and utility programs inclide:

Federal Incentives (2025) Inflation Reduction Act – High-Efficiency Electric Home Rebate Program. The Inflation Reduction Act (IRA) heat pump incentives are still available in 2025, though some parts are being phased out or reassessed  Federal Tax Credit: Up to $2,000 for qualifying heat pump systems o Must meet ENERGY STAR Most Efficient certification
o Available through December 31, 2025
91 of 348
9c 13
25-88496
GWP Incentives. Below are current electrification rebates provided by GWP.

However, GWP are reviewing the rebates and will be providing information to the City Council in the future.
 Heat Pump Mini-Split or Central Heat Pump AC: $500/Unit (up to $2,500 total) Timeline and next steps
Staff are seeking the City Council’s authorization to prepare and introduce AC2HP reach code language and submit applications to the CEC and CBSC, based on amendment to the 2022 Building Code.

Staff recommend utilizing the model language prepared by the Local Energy Codes program (Exhibit 2). To meet the September 30, 2025, code effectiveness date, the reach code ordinance could be adopted on a non-urgency basis before September 1, 2025 (Introduced August 19 and Adopted on August 26, becoming “effective” on September 26, 2025), or depending on the timing, could be presented for adoption in September on an urgency basis.

Staff reviewed other California Geen Building Standards voluntary measures. However, at this time staff have not undertaken studies to determine the feasibility of mandating the voluntary measures outlined in the table.

Occupancy Event Topic Proposed Changes
Single
Family
New Performance
margins
Higher performance margins
(0.18 to 2.7, depending upon
climate zone)
All New Outdoor
lighting
standards
Downlit and shielded
Multi
Family/Non
Residential
Addition
&
Alteration
Pools and
spas
Heat pump (gas back up
allowed) or gas with 60%
solar thermal/recovered
energy fraction.

STAKEHOLDERS/OUTREACH
92 of 348
9c 14
25-88496
Staff presented draft reach code language to the August 7, 2025, Sustainability Commission meeting and received recommendations and direction from the Commission.

Staff provided a copy of the reach code model language to the Community Development Building Official and the GWP Clean Energy Officer in June 2025.

FISCAL IMPACT
There is no fiscal impact associated with this report.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
This item is not subject to CEQA as it is not a project approval.

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION

1. The City Council may recommend staff to not prepare an AC2HP reach code until after the AB130 6-year restrictions expire.

2. The City Council may consider any alternates not presented by staff.

ADMINISTRATIVE ACTION
Submitted by:

John Takhtalian, Assistant City Manager
Prepared by:

David Jones, Sustainability Officer
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS

1. Custom Cost Effectiveness Analysis: City of Glendale Ac to Heat Pump Replacement.

2. Model Reach Code Language.
93 of 348
9a
25-88603

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Introduction of an Ordinance of the City of Glendale, California, Amending the Glendale Building and Safety Code Volume IX to Adopt Local Amendments to the 2022 Edition of the California Building and Energy Code to require projects in single-family homes, duplexes and townhomes involving replacement or alteration (but not repair) of an existing air conditioning system or installation of new air conditioning systems must either include a heat pump space conditioner as the primary heating system, or install specific energy efficiency measures in addition to a new air conditioner.

1. Introduction of Ordinance

COUNCIL ACTION
Item Type: Action Item
Approved for August 19, 2025 calendar

EXECUTIVE SUMMARY
In 2022, Glendale adopted local Reach Codes requiring all-electric new construction, photovoltaic (PV) systems, and electric vehicle (EV) charging infrastructure. Following a 2023 court ruling overturning Berkeley’s natural gas ban, the City suspended enforcement of the all-electric requirement in June 2024 but continued PV, EV, and electric-readiness provisions.

In April 2025, the City Council began exploring an Air Conditioner to Heat Pump (AC2HP) Reach Code for existing single-family homes, duplexes, and townhomes. On August 12, 2025, Council directed staff to introduce an ordinance based on modified CALGreen voluntary provisions—that would require installation of a heat pump as the primary heating source; or permit the gas furnace to be retained, but require installation of additional energy-efficiency upgrades where an air conditioning system (not including repair of existing systems) is being replaced or added. The ordinance aims to reduce 94 of 348
9a 2
25-88603
greenhouse gas emissions by promoting high-efficiency heat pump technology and aligns with state climate goals, the City’s General Plan Safety Element, recently adopted Climate Action and Adaptation Plan (CAAP), and the City’s Greener Glendale Plan. Compliance requirements vary depending on whether existing ducts are reused or replaced, with specific duct sealing, airflow, and insulation standards.

Further, the Council also requested staff develop a heat pump rebate program with direct payments to eligible residents (as opposed to utility bill statement credits)—designed to cover the cost difference between a heat pump and a standard air conditioner replacement, and that the rebate program be considered together with adoption of the reach code ordinance.

RECOMMENDATION
The City Council introduce an ordinance amending the Glendale Building and Safety Code, Volume IX, to include local reach code amendments to the 2022 Edition of the California Building Energy Code pertaining to heat pumps.

ANALYSIS
In 2022, Glendale adopted local Reach Codes covering building electrification, photovoltaic (PV) systems, and electric vehicle (EV) charging through amendments to the 2022 California Building and Energy Code. These required all-electric new construction (with limited waivers), PV installations for most non-residential and multifamily buildings, and EV charging infrastructure in most new developments.

Following a 2023 federal court ruling striking down Berkeley’s natural gas ban, Glendale’s City Council suspended enforcement of its all-electric new construction requirement in June 2024 but continued enforcing PV, EV, and electric-readiness provisions. In April 2025, Council directed staff to explore a new Air Conditioner to Heat Pump (AC2HP) Reach Code requiring heat pumps or other energy-efficiency upgrades in existing single-family homes when air conditioning systems are installed or replaced.

At the City Council meeting of August 12, 2025, City Council directed staff to introduce an AC2HP Reach Code (Exhibit 1) in accordance with the CalGreen voluntary code provisions for existing single-family buildings (houses, duplexes and townhomes) that would require installation of a heat pump as the primary heating source, or other energy conservation improvements, in cases where an existing air conditioning system is altered or replaced, or where an air conditioning system is added, and which clarifies that the ordinance does not apply to an air conditioning system repair.

Additionally, Council directed Glendale Water and Power staff to bring a heat pump rebate program to the City Council for consideration at the time of adoption of the reach code ordinance, and that such rebate program be (i) based on direct payment to qualified residents as opposed to a bill credit, and (ii) that the rebate address the cost 95 of 348
9a 3
25-88603
differential between a standard heat pump replacement and an air conditioner replacement.

Proposed Ordinance
The proposed ordinance would amend the 2022 California Energy Code, Title 24, Part 6, as adopted, amended and codified under Glendale Building and Safety Code Volume IX to include, as mandatory, an amended version of the voluntary requirements of the 2025 Title 24, Part 11 California Green Building Standards Code (CALGreen), Section A4.204.1.1 for heat pump space conditioning alterations in single family homes.

CALGreen includes both mandatory and voluntary measures. Jurisdictions may adopt the voluntary measures as mandatory requirements. If the requirements affect the California Energy Code, as the proposed ordinance does, they must be found to be cost effective and must require that buildings be designed to use less energy than the standard California Energy Code. The attached study commissioned by the California Codes and Standards Program (Exhibit 2) has found that the proposed requirements are cost effective and will result in a reduction in Long-Term System Cost (LSC) energy relative to the existing building.

Staff has proposed a modified version of the CALGreen Code that would encourage the installation of a heat pump space conditioning system at the time an air conditioner is replaced or added to an existing home. The proposed ordinance is based on the CALGreen code but has been modified to facilitate implementation. As proposed, a project may comply with the ordinance by either installing a heat pump space conditioner and no other measures other than those that are required under the California Energy Code, or maintain a gas furnace as the primary heating source and install additional energy efficiency measures above what is required under the California Energy Code.

There are several different ways a project could comply. The simplest way would be to install a heat pump (an air conditioner that is also configured to function as a space heater). This could be done either by replacing the furnace with a heat pump system (with or without a furnace) to serve as the air handler for the heat pump, and as a backup heating system. California Energy Code requirements would apply; these vary depending upon whether the duct system is replaced at the same time.

Alternatively, a project could comply by installing an air conditioner but rely on a gas furnace for space heating. Again, certain California Energy Code requirements would apply when replacing an air conditioner. In addition, this alternative would require other energy efficiency measures.

Table 1 presents compliance requirements for heat pump systems under two scenarios, one using the existing ducts, the other with new ducts. Table 2 presents compliance 96 of 348
9a 4
25-88603
requirements for systems that still use furnaces as the primary heating source, under the same duct scenarios.

Table 1. Summary of Requirements if Using a Heat Pump
(for both heating and cooling)
Ducts State Code Requirements Additional Local Code
Requirements
Existing
 Duct sealing (10% leakage)
 Airflow efficiency (300 CFM/ton)
 Refrigerant charge verification
 None
New
 Duct sealing (5% leakage)
 Airflow efficiency (350 CFM/ton)
 Fan efficacy (0.58 W/CFM)
 Refrigerant charge verification
 Attic insulation (R-49)
 Air sealing
 R-8 Duct insulation
 None
Note: When installing a heat pump, a homeowner may also opt to keep the existing furnace or install a new furnace to provide supplemental heating only (below 35°F) Table 2. Summary of Requirements if Using a Furnace
(for heating and an air-cooled air conditioner for cooling) Ducts State Code Requirements Additional Local Code
Requirements
Existing
 Duct sealing (10% leakage)
 Airflow efficiency (300 CFM/ton)
 Refrigerant charge verification
 Fan efficacy (0.45 watts/CFM)
 Attic insulation (R-49)
 Air sealing
New
 Duct sealing (5% leakage)
 Airflow efficiency (350 CFM/ton)
 Fan efficacy (0.45 W/CFM)
 Refrigerant charge verification
 Attic Insulation (R-49)
 Air sealing
 R-8 Duct insulation
 Fan efficacy (0.35 watts/CFM)
Impacts
There are some incremental costs associated with converting to a heat pump, but these costs are offset by utility bill savings over the lifetime of the equipment and the initial investment differential will be incentivized through the GWP rebate program. From a 97 of 348
9a 5
25-88603
societal perspective, the incremental costs are more than offset by the savings that accrue to all utility billpayers (e.g., reductions in utility infrastructure costs). The incremental cost, that is the amount over what would otherwise be needed to just replace the air conditioner and comply with the 2025 California Energy Code, depends on whether the furnace is replaced at the same time as the air conditioner. The lifetime of a furnace and air conditioner are about the same, 10-15 years, so it often makes economic sense to replace both if the furnace is near the end of its life. In this scenario, the cost of the furnace replacement is assumed as part of the base project cost.

Alternatively, a heat pump could be configured to operate as the primary heating source using the air handler in the existing furnace and using the furnace for supplemental heating on very cold days.

The costs may be offset by federal tax credits in the amount of 30% off total project costs up to $2,000. Additionally, Glendale Water and Power staff are bringing a heat pump rebate program to the City Council for consideration at the time of adoption of the reach code ordinance. The heat pump rebate program will be presented to City Council August 26, 2025, to consider with the adoption of the AC2HP Reach Code.

In terms of greenhouse gas emissions, heat pumps can provide significant reductions.

This is because heat pumps are far more efficient than gas furnaces (and electric resistance heat) and because an ever-increasing amount of electricity in California is derived from low-carbon energy sources.

Exceptions
The proposed Ordinance offers two general exceptions. The first is for situations where the electrical panel capacity is insufficient to meet the load of a heat pump. The second is where the heat pump would need to be sized more than 12,000 Btu/hr (1 ton) over the air conditioner that would be installed in order to meet the heating load. This exception would pertain to colder California climate zones and would not be normally utilized in Glendale. There are also exceptions in the proposed ordinance to the duct sealing and airflow requirements that specify alternative methods of compliance. All applicable exceptions in the California Energy Code also apply.

Newly adopted State legislation (AB 130) and Critical Timing Impacting Adoption of Local Reach Code Amendments to the Residential Building Code On June 30, 2025, the Legislature adopted, and the Governor signed into law, Assembly Bill (AB) 130 (formerly AB 306); AB 130 became immediately effective.

Among other things, AB 130 restricts local jurisdictions from adopting local amendments to the residential building code for the next two code cycles, between October 1, 2025, 98 of 348
9a 6
25-88603
and June 1, 2031, subject to limited exceptions, including changes related to home hardening and health safety.

Staff has evaluated the various implications of AB 130, including on how the City may proceed with adopting an AC2HP reach code before the October 1, 2025 restrictions take effect. AB 130 allows the City to adopt a reach code that encourages the use of a heat pump or dual-fuel system (a heat pump combined with a furnace), when an air conditioner is replaced or installed in existing single-family homes, duplexes or townhomes if the proposed local changes are “substantially equivalent to changes or modification that were previously filed [with the California Building Standards Commission] by the governing body of the city or county and were in effect as of September 30, 2025” (Emphasis added).(AB 130, Section 29, amending Health & Safety Code §17958(b)(1) “Exception 1”). Compliance with this provision entails adopting a reach code in sufficient time to take effect before September 30, 2025.

There are two pathways to accomplish this:

1. Amend the 2022 Energy Code
Adopt a reach code based on the existing 2022 Energy Code so that it “will be in effect” before September 30, 2025. Then, when the City adopts the 2025 Building Standards (which it must do before the end of the year) the City can use AB 130, Exception 1, to adopt a reach code on the 2025 Energy Code that is “substantially similar” to the one adopted before September 30, 2025. The City Council would be required to adopt findings that the 2025 reach code is substantially similar. This is the process staff is recommending.

2. 2025 Code Pathway
Propose the reach code in the 2025 Building Standards Code adoption process scheduled to occur before the end of 2025. The second option requires the City to show that the proposed changes are: i) “necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025” (the proposed reach code aligns with the City’s Safety Element adopted on April 1, 2025), ii) that “permits mixed fuel residential construction consistent with federal law”, e.g. compliance with the federal Energy Policy and Conservation Act (EPCA), (the reach code allows mixed-fuel options and therefore does not conflict with EPCA), and, iii) incentivizes “all-electric construction as part of an adopted greenhouse gas emissions reduction strategy” (the AC2HP is an all-electric option that is incentivized through energy cost savings and installation cost rebates). Staff has evaluated this option and believes the reach code would comply with all the requirements of this exception.
99 of 348
9a 7
25-88603
With respect to Option 1 (amending the 2022 Building Standards Code), there is time to introduce and adopt the reach code by August 31, 2025, so that it becomes effective before the end of September; however, if the reach code is scheduled for adoption after August 31, 2025, it would need to be adopted on an urgency basis in order to be effective before September 30, 2025.

The proposed reach code ordinance would be submitted to the CEC and CBSC immediately upon adoption; however, their approval is not required for the ordinance to become effective, but the reach code could not be enforced until CEC and CBSC approval is obtained.

Should Council approve staff’s recommendations, work would proceed on the timeline provided in Table 4 below.

Table 3. Schedule and Next Steps
Task Timeframe
Ordinance Introduction (Attachment 1) and submittal to
the California Energy Commission and California
Building Standards Commission
8/19/2025
Ordinance Adoption(Attachment 1) and submittal to the
California Energy Commission and California Building
Standards Commission
8/26/2025
Ordinance goes into effect 9/25/2025
Receive approval from the California Energy
Commission and California Building Standards
Commission approves for filing
TBD

STAKEHOLDERS/OUTREACH
Staff presented DRAFT reach code language to the August 7, 2025, Sustainability Commission meeting and received recommendations and direction from the Commission.

Staff provided a copy of the reach code model language to the Community Development Building Official and the GWP Clean Energy Officer in June 2025. Staff presented the proposed ordinance to the City Council at the August 12, 2025, meeting.

FISCAL IMPACT
There is no fiscal impact associated with this report.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
100 of 348
9a 8
25-88603
The City Council finds and determines that this Ordinance is exempt from review under the California Environmental Quality Act (California Public Resources Code §§15000, et seq., "CEQA"), and the regulations promulgated thereunder (14 California Code of Regulations §§15000, et seq., the "CEQA Guidelines") because it consists of revisions and clarifications to an existing code of construction-related regulations and specification of procedures related thereto being taken for enhanced protection of the environment and while there may be added infrastructure resulting from the implementation of the Reach Codes, it does not have the potential to cause significant effects on the environment; to the contrary, the transition from fossil fuel sources is part of the State of California’s overall plan to decrease GHG emissions from stationary and transportation sources. Adoption of the Ordinance is categorically exempt in accordance with CEQA Guidelines §15305 as a minor alteration in land use limitations which do not result in any changes in land use or density and is exempt under CEQA Guidelines §15308 as an action taken by a regulatory agency as authorized by California law to assure maintenance or protection of the environment.

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION
Alternate 1: Do not introduce an Ordinance Amending the Glendale Building and Safety Code, Volume IX, to Adopt Local Amendments to the 2022 Edition of the California Building and Energy Code.

Alternate 2: Introduce the Ordinance Amending the Glendale Building and Safety Code, Volume IX, to Adopt Local Amendments to the 2025 Edition of the California Building and Energy Code after October 1, 2025 using the General Plan Exemption set forth in AB 130.

Alternate 3: The City Council may consider any alternates not presented by staff.

ADMINISTRATIVE ACTION
Submitted by:

John Takhtalian, Assistant City Manager
Prepared by:

David Jones, Sustainability Officer
Approved by:

Roubik R. Golanian, P.E., City Manager
101 of 348
9a 9
25-88603

EXHIBITS/ATTACHMENTS

1. California’s Fourth Climate Change Assessment, Los Angeles Regional Report, 2018

2. 2025 Single Family AC to Heat Pump Cost-Effectiveness Study. 102 of 348
9a
25-87656

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Ordinance Amending Glendale Municipal Code provisions regarding meetings, powers and duties of the Commission on the Status of Women

1. Introduction of Ordinance Amending Sections 2.38.090 and 2.38.140 of the Glendale Municipal Code, 1995 – Relating to the Commission on the Status of Women.

COUNCIL ACTION
Item Type: Action Item
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
During its March 18, 2025, Council recommended certain changes to the frequency of meetings of the Commission on the Status of Women and their powers and duties. This report provides those amendments by changing the frequency of meetings from quarterly to monthly. It further amends the provisions pertaining to the Commission’s powers and responsibilities, to include regular programming based on policy recommendations of the Commission’s Report on the Status of Women and Girls and the City’s Workforce Demographics Report, engaging in community partnerships and fundraising.

RECOMMENDATION
Staff recommends introduction and adoption of the Ordinance as directed by Council.

ANALYSIS

BACKGROUND
The Commission on the Status of Women (CSW) was originally established in 2003 to serve as an advisory body to the City Council, providing recommendations on policies, programs, and services that address the needs of women in Glendale.

Per Glendale Municipal Code (“GMC”) Section 2.38.140, the powers and duties of the Commission were established as follows:
"The powers and duties of the Commission on the Status of Women shall 103 of 348
9a 2
25-87656
be to assess and evaluate the needs and issues of women in the City in order to inform and advise the City Council, City departments and divisions, and other community agencies and organizations of those needs and issues; recommend programs or legislation to the City Council to promote and ensure equal rights and opportunities to and for women in the City; to promote education on issues regarding matters involving the needs of women and to prepare and disseminate such information; provide outreach information and education that empowers women to achieve self-sufficiency and self-esteem; maintain an active liaison with groups, organizations, agencies and individuals in regard to issues related to women; perform other duties as may be imposed upon the Commission by the City Council by ordinance or resolution."
Since its inception, the CSW has undergone multiple modifications, including changes to its composition, meeting frequency, and overall function. The Council has directed the restoration of CSW’s programmatic function and an increase in the frequency of its regular meetings. To that end, the City Attorney has prepared a draft ordinance for the Council’s consideration. The draft Ordinance increases the regular meeting schedule from quarterly to monthly, and modifies the CSW’s powers and duties, as follows:

The powers and duties of the commission on the status of women shall be to assess and evaluate the needs and issues of women in the city in order to inform and advise the city council, city departments and divisions, and other community agencies and organizations of those needs and issues; recommend legislation to the city council and/or organize programs or legislation to the city council to promote and ensure equal rights and opportunities to and for women in the city based on the Report on the Status of Women and Girls prepared from time to time at the behest of the commission and the City’s Workforce Demographics Report; to promote education on issues regarding matters involving the needs of women and to prepare and disseminate such information; provide outreach information and education that empowers women to achieve self-sufficiency and self-esteem; engage and maintain an active liaison with groups, organizations, agencies and individuals in regard to issues related to women; explore and engage in fundraising activities; perform other duties as may be imposed upon the commission by the city council by ordinance or resolution.

STAKEHOLDERS/OUTREACH
N/A

FISCAL IMPACT
There is no direct fiscal impact associated with adoption of the proposed ordinance.

The existing position headcount will be transferred from the City Clerk’s departmental budget to the City Manager’s Office within the General Fund in order to accommodate 104 of 348
9a 3
25-87656
the increased meeting frequency and additional programmatic functions for the CSW.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
The ordinance implementing changes to the CSW is exempt from environmental review under the California Environmental Quality Act ("CEQA") pursuant to Title 14 of the California Code of Regulations ("CEQA Guidelines"). The proposed ordinance is not a “project” for CEQA purposes as it involves only organizational and administrative activities of government. CEQA Guidelines Sec. 15378(b)(5). It is further exempt since it can be seen with certainty that there is no possibility that the activity may have a significant effect on the environment per CEQA Guidelines Section 15061(b)(3).

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES TO STAFF RECOMMENDATION

1. The Council could choose not to introduce or adopt the Ordinance.

2. City Council may elect to consider any other alternative not proposed by staff.

ADMINISTRATIVE ACTION
Submitted by:

Michael J. Garcia, City Attorney
Prepared by:

Lucy Varpetian, Principal Assistant City Attorney
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS

1. Councilmember Asatryan’s comments on the proposed Ordinance submitted on August 26, 2025
105 of 348
ORDINANCE NO. ____________

AN ORDINANCE OF THE COUNCIL OF THE CITY OF GLENDALE,
CALIFORNIA AMENDING SECTIONS 2.38.090 and 2.38.140 OF
THE GLENDALE MUNICIPAL CODE, 1995, PERTAINING TO THE

FREQUENCY OF MEETINGS AND POWERS AND DUTIES

OF THE COMMISSION ON THE STATUS OF WOMEN
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA:

SECTION 1. Section 2.38.090 of the Glendale Municipal Code, 1995, is amended to read as follows:
§ 2.38.090 Meetings.

A. The commission shall meet at least once quarterly a month at such time and place as the commission may fix by resolution, consistent with the dates and times available for televising the meetings.

B. Special meetings of the commission may be called at any time by the chairperson, or three voting members thereof by written notice served upon each member as required by the Ralph M. Brown Act.

C. All meetings of the commission shall be open to the public and held in compliance with the provisions of the Ralph M. Brown Act. The commission on the status of women shall keep a record of minutes of all its proceedings and actions which shall be available for public inspection.

SECTION 2. Section 2.38.140 of the Glendale Municipal Code, 1995, is amended to read as follows:
§ 2.38.140 Powers and duties—Generally.

The powers and duties of the commission on the status of women shall be to assess and evaluate the needs and issues of women in the city in order to inform and advise the city council, city departments and divisions, and other community agencies and organizations of those needs and issues; recommend legislation to the city council and/or organize programs or legislation to the city council to promote and ensure equal rights and opportunities to and for women in the city based on the Report on the Status of Women and Girls prepared from time to time at the behest of the commission and the City’s Workforce Demographics Report; to promote education on issues regarding matters involving the needs of women and to prepare and disseminate such information; provide outreach information and education that empowers women to achieve self-sufficiency and self-esteem; engage and maintain an active liaison with groups, organizations, agencies and individuals in regard to issues related to women; explore and engage in fundraising activities; perform other duties as may be imposed upon the commission by the city council by ordinance or resolution. 106 of 348
Adopted by the Council of the City of Glendale on the _____ day of , 2025. _________________________________
Mayor
ATTEST:
______________________________
City Clerk

STATE OF CALIFORNIA )
) SS.

COUNTY OF LOS ANGELES )
I, Suzie Abajian, Ph.D., City Clerk of the City of Glendale, hereby certify that the foregoing Ordinance No. ______ was adopted by the Council of the City of Glendale, California, at a regular meeting held on the _____ day of _______________, 2025, and that the same was adopted by the following vote:

Ayes:

Noes:

Absent:

Abstain:

______________________________
City Clerk
107 of 348
ORDINANCE NO. ____________

AN ORDINANCE OF THE COUNCIL OF THE CITY OF GLENDALE,
CALIFORNIA AMENDING SECTIONS 2.38.090 and 2.38.140 OF
THE GLENDALE MUNICIPAL CODE, 1995, PERTAINING TO THE

FREQUENCY OF MEETINGS AND POWERS AND DUTIES

OF THE COMMISSION ON THE STATUS OF WOMEN
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GLENDALE, CALIFORNIA:

SECTION 1. Section 2.38.090 of the Glendale Municipal Code, 1995, is amended to read as follows:
§ 2.38.090 Meetings.

A. The commission shall meet at least once quarterly a month at such time and place as the commission may fix by resolution, consistent with the dates and times available for televising the meetings.

B. Special meetings of the commission may be called at any time by the chairperson, or three voting members thereof by written notice served upon each member as required by the Ralph M. Brown Act.

C. All meetings of the commission shall be open to the public and held in compliance with the provisions of the Ralph M. Brown Act. The commission on the status of women shall keep a record of minutes of all its proceedings and actions which shall be available for public inspection.

SECTION 2. Section 2.38.140 of the Glendale Municipal Code, 1995, is amended to read as follows:
§ 2.38.140 Powers and duties—Generally.

The powers and duties of the commission on the status of women shall be to:

1. A assess and evaluate the needs and issues of women and girls in the city in order to inform and advise the city council, city departments and divisions, city boards and commissions, and other community agencies and organizations of those needs and issues;

2. Recommend legislation to the city council and/or organize programs or legislation to the city council to promote and ensure equal rights and opportunities to and for women and girls in the city drawing on information from, including but not limited to, based on the rReports on the Status of Women and Girls; prepared from time to time at the behest of the commission and the City’s Workforce Demographics Report; and any other issue the commission deems relevant regarding, structures, practices, processes and programs within City Hall and in the community impacting women and girls;

3. Ppromote education on issues regarding matters involving the needs of women and girls; and to prepare and disseminate such information; and provide outreach information and education that empowers women and girls to achieve self-sufficiency and selfesteem;

4. Consult, engage and maintain an active liaison with groups, organizations, agencies, other commissions, public bodies and individuals in regard to issues related to women;

5. E explore and engage in fundraising activities;
108 of 348

6. Work in conjunction with city departments regarding the development, implementation, and evaluation of programs a impacting women and girls, including receiving and providing input, reviewing programs from departments, and participating in working groups;

7. Submit an annual report and other reports to the city council as appropriate;

8. Pperform other duties as may be imposed upon the commission by the city council by ordinance or resolution.

Adopted by the Council of the City of Glendale on the _____ day of , 2025. _________________________________
Mayor
ATTEST:
______________________________
City Clerk

STATE OF CALIFORNIA )
) SS.

COUNTY OF LOS ANGELES )
I, Suzie Abajian, Ph.D., City Clerk of the City of Glendale, hereby certify that the foregoing Ordinance No. ______ was adopted by the Council of the City of Glendale, California, at a regular meeting held on the _____ day of _______________, 2025, and that the same was adopted by the following vote:

Ayes:

Noes:

Absent:

Abstain:
109 of 348

______________________________
City Clerk
110 of 348

AGENDA ITEM

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL
Report: Programs or Partnerships to Address Health and Social Challenges Affecting Men
1) Motion Directing Staff

COUNCIL ACTION

EXECUTIVE SUMMARY
At its July 16, 2024, meeting, the City Council discussed concerns regarding the social, health, and educational challenges facing men and boys in Glendale and directed staff to research practices in other jurisdictions. This report reviews national, state, regional, and city-level frameworks and programs, identifies common themes, and outlines potential opportunities for Glendale.

At the national level, initiatives such as the YMCA, Boys & Girls Clubs of America, Big Brothers Big Sisters of America, the National Fatherhood Initiative, and Year Up provide evidence-based frameworks that emphasize education, family stability, employment, health, mentoring, and safety. State efforts include proposed legislation in Washington to establish a Commission on Boys and Men. Numerous cities—including Long Beach, New York, Washington, DC, Boston, Baltimore, Philadelphia, Houston, Columbus, and Rochester—have implemented programs tailored to local needs, many tied to broader community initiatives rather than one demographic.

Across national, state, and local levels, the recurring challenge areas are 1) Education gaps, 2) Fatherhood/family instability, 3) Limited employment/economic mobility, 4) Health and mental health disparities, 5) Overrepresentation in justice systems, and 6) Need for mentoring/leadership opportunities.

Potential options for Glendale include building on existing partnerships with schools, nonprofits, health systems, and community organizations to improve outcomes for men and boys.

Item Type: Action Item
Approved for calendar
111 of 348

RECOMMENDATION
Council to provide direction to staff.

BACKGROUND AND ANALYSIS
At the July 16, 2024 City Council meeting, the Council discussed concerns regarding social, health, and educational challenges impacting men and boys in Glendale. Council directed staff to prepare a report on:
• What other jurisdictions are doing to address these issues. • Ways Glendale might evaluate and strengthen local programming, services, and partnerships.
• Opportunities for Glendale to be proactive in improving quality of life for men and boys while supporting overall community well-being.

Overview of Common Issues
Across national, state and local levels, the recurring challenge areas are:
• Education gaps
• Fatherhood/family instability
• Limited employment/economic mobility
• Health and mental health disparities
• Overrepresentation in justice systems
• Need for mentoring/leadership opportunities
Research Findings

1. National Programs/Frameworks
YMCA – Longstanding community institution offering health, wellness, mentoring, leadership programs.
• YMCA of the USA
Boys & Girls Clubs of America – Provides after-school programs with focus on academic success, character development, and healthy lifestyles. • Boys & Girls Clubs of America
Big Brothers Big Sisters of America – Evidence-based, one-to-one mentoring for youth of all backgrounds, with proven outcomes in education and behavior. • Big Brothers Big Sisters of America
National Fatherhood Initiative (NFI) – Evidence-based curricula supporting fatherhood, 112 of 348

Page 3 of 5 ends

family stability, and reentry programs. Programs include 24:7 Dad, InsideOut Dad, and Understanding Dad.
• National Fatherhood Initiative
Year Up United – Workforce development program focused on education and employment for young adults.
• Year Up United
My Brother’s Keeper (MBK) Alliance – Obama Foundation national initiative focused on six milestones (school readiness, reading by 3rd grade, high school graduation, postsecondary completion, employment, and safety).. • My Brother’s Keeper (MBK) Alliance
Men’s Health Network – a national nonprofit offering toolkit, health campaigns, and educational resources to promote preventive care and wellness among men and boys. • Men’s Health Network

2. State-Level
Washington State (pending legislation, HB 1266 & SB 5446): Would create a Commission on Boys and Men with five focus areas:
• Education
• Fatherhood, Family & Relationships
• Jobs, Careers & Financial Health
• Physical & Mental Health
• Experiences in Court Systems
• Proposed Commission on Boys and Men

3. City-Level Initiatives
• New York City – Young Men’s Initiative (YMI): Comprehensive approach addressing education, employment, and mentorship (includes NYC Men Teach). • Washington, DC – Commission on Fathers, Men & Boys: Advises Mayor and Council on disparities and solutions.
• Boston, MA – Office of Male Engagement: Coordinates services and funds programs for men and boys.
• Columbus, OH – Mentorship and leadership programs adapted from national models.
113 of 348

Page 4 of 5 ends

Across national, state and local levels, the common themes are closing opportunity gaps in education and employment, improving fatherhood and family stability, addressing health and mental health disparities, reducing overrepresentation in justice systems, and creating mentoring/leadership opportunities. These frameworks and programs recognize that improving outcomes for men and boys also benefits community well-being.

Potential Opportunities & Partnerships in Glendale

1. Youth Mentorship & Development
• Afterschool club-style programs with tutoring, recreation, and mentoring. • Local Partners: Glendale Unified School District (GUSD), Glendale Community College (GCC), Glendale Youth Alliance.

2. Fatherhood & Family Engagement
• Evidence-based fatherhood curricula (e.g., 24:7 Dad, InsideOut Dad); community-driven father engagement events.
• Local Partners: Verdugo Woodlands Dads’ Club, faith-based organizations, family support nonprofits.

3. Health & Wellness for Men & Families
• Preventive health, fitness, and mental health initiatives; wellness and recreation-based programs.
• Local Partners: Glendale Healthier Community Coalition (GHCC), local hospitals and clinics, LA County Public Health, recreation nonprofits.

4. Career Pathways & Workforce Development
• Job readiness programs, skill-building pipelines, mentorship linked to career development.
• Local Partners: Glendale Youth Alliance, GCC PDC, local businesses, Verdugo Workforce Board

5. Governance & Coordination
• Establish a City Commission or Initiative on Men & Boys; conduct a full inventory of existing programs; strengthen nonprofit and community collaborations.
• Local Partners: City departments, community-based organizations, school district, community college, healthcare systems.

FISCAL IMPACT
114 of 348

Page 6 of 5 ends

There is no fiscal impact at this time. Should the Council wish to pursue this further, staff will return with cost estimates aligned with Council’s direction, including the allocation of City personnel and potential funding sources.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
N/A

CAMPAIGN DISCLOSURE
This item is exempt from campaign disclosure requirements.

ALTERNATIVES

1. Note and file this report.

2. Ask staff to conduct additional research on areas of interest to the City Council.

3. Direct staff to prepare a report/plan with recommendations for targeted programming, partnerships, and policy options.

4. Form a Task Force or Working Group with representatives from City departments, GUSD, GCC, and community partners to develop a framework/program tailored to Glendale.

5. Provide other direction as deemed appropriate by Council.

EXHIBITS
None
115 of 348

M O T I O N
Moved by Council Member _________________________, seconded by Council Member ___________________________, that, with respect to the Report to Council dated September 9, 2025 (“Report”) pertaining to Programs or Partnership to Address Health and Social Challenges Affecting Men, the Council directs staff as follows:

Vote as follows:

Ayes:

Noes:

Absent:

Abstain:
116 of 348
9c

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Key Considerations and Refinements to the Clean Energy Programs Plan Funded by Public Benefit Charge and Low Carbon Fuel Standard for Fiscal Years 25-26 and 26-27.

1. Resolution authorizing Glendale Water & Power (GWP) staff to implement programs consistent with the outlined refinements to the Glendale Water and Power Clean Energy Programs Plan funded by Public Benefit Charge (PBC) and Low Carbon Fuel Standard (LCFS) for Fiscal Years (FY) 25-26 and FY 26-27.

2. Resolution of Appropriation requesting $200,000 for the vehicle-to-everything (V2X) study supporting a potential pilot program.

COUNCIL ACTION
Item Type: Action
Approved for September 9, 2025 calendar

EXECUTIVE SUMMARY
This report responds to Council comments from June 4, 2025, and subsequent meetings following adoption of the Clean Energy Programs Plan. The plan was approved on June 24, 2025, and Council directed staff to return with additional review and refinements before implementing new programs. This report outlines adjustments to program elements and implementation timelines based on Council feedback.

The Clean Energy Programs Plan details GWP’s planned use of PBC and LCFS funds to deliver energy efficiency, utility assistance, load management, and electrification programs and initiatives. The plan supports Glendale’s environmental and equity goals while aligning with state legislation.

This report also provides the rationale and guiding framework for GWP’s clean energy programs portfolio. The refined portfolio remains aligned with GWP’s Integrated Demand Side Management (IDSM) strategy and is designed to conserve energy and water, improve grid reliability, provide utility assistance to income-qualified residents, and reduce greenhouse gas emissions, while supporting California’s broader objectives to decarbonize and modernize the energy system.
117 of 348
2 9c

RECOMMENDATION
Authorize staff to proceed with program refinements and implementation of the Clean Energy Programs Plan funded by the PBC and LCFS for FY 25-26 and 26-27 consistent with the refinements outlined, while continuing to monitor, adjust, and refine program measures, timelines, and incentives as needed to remain responsive to evolving technologies, community needs, Council feedback, and regulatory requirements.

Concurrence to move forward will allow timely implementation and ensure that the benefits of programs reach Glendale residents and businesses without delays.

Additionally, staff recommends that the City Council approve the appropriation of $200,000 in FY 25-26 to conduct a study in support of the V2X pilot program.

ANALYSIS
This section outlines specific actions undertaken in response to Council feedback and describes GWP’s approach for designing and implementing its clean energy portfolio.

1. Home Energy and Water Saving Rebates
One area of Council feedback focused on Heating, Ventilation, and Air Conditioning (HVAC) rebates and how incentives are delivered. Council expressed interest in issuing HVAC rebate checks rather than bill credits. GWP already provides checks for other programs, such as e-bike and electric vehicle (EV) charger rebates, so extending this process to HVAC systems would primarily involve process adjustment with Finance and is feasible. The Clean Energy Section currently provides more than 600 electric rebates annually through the Home Energy and Water Saving Rebates program. While transitioning all rebates to checks would increase administrative needs, limiting this change to higher-cost measures such as permitted HVAC systems, water heaters, and panel upgrades is practical and allows customers to recover their investments more quickly.

Under the approved Clean Energy Programs Plan, the Home Energy and Water Saving Rebates program would offer $1,000 per ton for new heat pump fuel-switching retrofits, up to $5,000 for a 5-ton system, plus an additional $1,000 for home electrification panel upgrades. In response to Council feedback, staff proposes adding rebates for electricto-electric (i.e. old heat pump to new heat pump) upgrades at $500 per ton. Although incremental savings are lower for electric-to-electric conversions, this approach provides meaningful support to encourage the adoption of more efficient HVAC systems and remains consistent with overall program goals and requirements.

2. Advancing V2X and Demand Response (DR)
V2X technologies represent a rapidly evolving area of innovation with the potential to provide grid support, backup power, and enhanced grid flexibility. V2X enables EVs to communicate with and supply energy to homes, businesses, or the grid, supporting peak demand reduction, renewable energy generation, and enhanced load shaping.

While the strategic value of V2X technology is increasingly recognized, the technology is still maturing. Market availability of V2X-enabled vehicles and bidirectional charging 118 of 348
3 9c
infrastructure is currently limited, with evolving standards, high costs, uncertainties around customer adoption, utility integration, and long term-interoperability. Premature investment risks locking into solutions that may not have the potential to scale, creating stranded assets or underperforming pilots.

To ensure GWP makes timely, informed, and cost-effective decisions, staff recommends conducting a scoped study to assess the technical, economic, behavioral, and operational feasibility of implementing a V2X program in Glendale. This study would focus on assessing bidirectional chargers, vehicles, and utility interface capabilities for current and future compatibility. In addition, the study will evaluate various V2X scenarios and customer segments, analyzing the distribution level effects of V2X implementation, such as load managing and shaping. Furthermore, the study will assess the cost-effectiveness of V2X solutions, recommending pilot models, incentive structures, and evaluation frameworks aligned with local needs and best practices.

Importantly, findings from this study will also inform the design of a new, cost-effective DR program, helping GWP optimize load management, evaluate potential grid impacts, and integrate V2X enabled resources into DR strategies.

To support this work, GWP will partner with a neutral academic or research institution to provide third-party analysis, case study reviews, economic modeling, and project support. This outside expertise will help ensure program design reflects best practices and aligns with Glendale’s unique customer base and load profile. Following feedback from a GWP Commissioner and Councilmember, the Clean Energy team has already initiated exploratory efforts with UCLA’s Smart Grid Energy Research Center (SMERC) to develop strategic collaboration to support research, assessment, and pilot program design for V2X technologies. This study represents a foundational step toward V2X applications and will guide development of pilot program frameworks tailored to Glendale’s grid needs and Council priorities.

Although initial funding was earmarked for FY 26-27, staff now anticipates undertaking the study in FY 25-26 to begin earlier progress on pilot program design and implementation.

DR is another evolving area that can help adjust consumer demand based on real-time energy availability, help balance supply and demand, and reduce reliance on fossil fuel-based plants. Lessons learned from previous DR initiative, which was costly (approximately $19,000 per MWh) and limited in impact, will guide the development of a new framework focused on dispatchable, measurable, and cost-effective DR strategies that provide clear grid benefits. The new DR program design framework sets a target cost of less than $200 per MWh for typical dispatches, with flexibility for up to $1,500 per MWh in rare grid emergency events. This ensures that GWP invests in DR solutions that deliver meaningful load reduction while remaining aligned with ratepayer value.

By using these cost thresholds, GWP can implement DR programs that are performance-based, grid responsive, financially sustainable, and saleable. GWP will also leverage insights from the V2X study into the DR program design.

GWP will explore different options to implement this program either through a 119 of 348
4 9c
participation agreement with SCPPA or direct contracting with a selected institution.

3. Commercial Energy and Water Savings Rebates
GWP’s Commercial Rebates Program will offer one of the most extensive lists of measures among municipal utilities, with a focus on supporting small businesses. While GWP has flexibility to adjust measures and incentives, all rebates are designed to align with overall cost-effectiveness goals. The rebate list was carefully developed to balance energy impact with practical considerations for small businesses. For example, GWP will offer a $2,000 flat rebate for commercial dishwashers. These units can range in price from a few thousand dollars to tens of thousands, and since small businesses typically purchase smaller units, this rebate will help them recoup initial investments more effectively, promoting adoption while managing program efficiency.

GWP’s rebates and programs are dynamic and need to be periodically updated in response to industry standards, technology performance, and projected energy savings.

This ensures that program incentives remain aligned with the most current best practices, state codes, and energy savings data.

To ensure the program meets actual business needs, staff will gather ongoing feedback from participating businesses through surveys and direct engagement. Incentives and program measures will be continuously reviewed and adjusted based on real-world experience, ensuring that the rebates remain responsive, equitable, and tailored to Glendale’s commercial community.

The Clean Energy team is collaborating with the City’s Sustainability Officer and Integrated Waste Management Division to develop a Green Business Efficiency Pilot.

Early planning includes a stakeholder survey to gather input from commercial customers, ensuring new rebate offerings and program design reflect the needs of Glendale businesses and the community. This feedback will ensure that proposed rebate offerings and program design are responsive to the needs of Glendale businesses while also informing the development of the Commercial Energy and Water Saving Rebates Program.

4. Clean Energy Programs Principles and Policy Alignment The development and delivery of GWP’s energy and water efficiency programs continue to be guided by four principles: cost-effectiveness, policy alignment, equity and accessibility, and a data-driven approach. GWP applies several cost-effectiveness tests, with the Total Resource Cost (TRC) test serving as the primary measure to evaluate whether programs deliver more value than they cost. The goal is to maintain a portfoliowide TRC ratio above 1.0. Programs are designed to comply with California’s requirement that all cost-effective efficiency measures be pursued before investing in new generation.

Assembly Bill (AB) 1890 and the California Public Utilities Code Section 385 require that municipal utilities establish a PBC equal to 2.85% of annual retail electric rate revenues to fund investments in one or more of the following areas:
• Cost-effective demand side management (DSM) services to promote energy efficiency and energy conservation
120 of 348
5 9c
• New investment in renewable energy resources and technologies • Research, development and demonstration programs
• Services provided for low-income electricity customers, including but not limited to, targeted energy efficiency service and rate discounts.

When allocating funding across program areas, GWP takes a coordinated and balanced approach to ensure it meets energy savings targets while also prioritizing support for income-qualified customers. Since equity and affordability are a key consideration to portfolio design, a significant portion of the PBC funding, approximately 40-50 percent over the next two years, will be dedicated to income-qualified services. This includes utility rate discounts, as well as targeted energy and water efficiency upgrades and related services to help reduce long-term utility costs for vulnerable households.

AB 2021 added to the state’s energy efficiency policies by requiring the establishment of ten-year energy efficiency targets every four years to facilitate the development and implementation of the programs and to also help identify future potential savings opportunities. GWP’s energy savings target for FY 25-26 and FY 26-27 is approximately 10 million kWh annually, representing about 1% of total retail electricity sales.

In summary, GWP’s programs are designed to achieve measurable and sustainable outcomes, by delivering a TRC ratio greater than 1, ensuring that the portfolio of programs is cost-effective in addition to achieving the 1 percent annual savings goal, and aligning with policy drivers. Finally, the portfolio is built to offer diverse programs to all customers in Glendale, empowering them to reduce consumption and actively support decarbonization efforts while ensuring affordability for income-qualified customers.

To support consistency and regulatory compliance, GWP uses the California Publicly Owned Utility (POU) electronic Technical Reference Manual (eTRM) when designing and evaluating energy efficiency and demand side programs. The eTRM is a centralized digital database of standardized energy efficiency measures, and is used by utilities, regulators, and program administrators. It contains a vetted list of technologies and practices that are pre-evaluated for their expected energy savings and demand reduction potential. By relying on eTRM-defined measures, GWP ensures that program offerings are aligned with the industry best practices, consistent with regulatory expectations and evolving state energy codes.

Figure 1 provides a screenshot of the eTRM database interface to illustrate the structure and range of available measures. While the database is extensive and multilayered, this visual highlights how technologies are categorized and how GWP can access detailed savings estimates for specific measures.
121 of 348
6 9c
Figure 1: eTRM Database Interface
In cases where emerging technologies are not yet defined and listed in eTRM, GWP may use custom saving calculations or pilot projects to evaluate technologies for their feasibility and grid impacts. Customer-facing program outcomes are reported annually to the California Energy Commission (CEC), as required under Senate Bill (SB) 1037, AB 2021, and Section 9505 of the Public Utilities Code.

GWP updates its programs periodically in response to the eTRM which reflects evolving technologies and industry standards. GWP uses these updates to refresh its offerings, phase out low-performing measures, and introduce new rebates and services that align with current codes and market conditions. Furthermore, even though the programs are designed using a structured approach and incentive levels are justified based on costeffectiveness testing, GWP has some flexibility to allow individual measure and program adjustments as technologies evolve and based on community needs.

STAKEHOLDERS/OUTREACH
Staff has reviewed and addressed feedback received from the GWP Commission and City Council, while continuing interdepartmental coordination to ensure program feasibility and alignment with operational goals. Ongoing collection of customer and community input, along with external collaboration will support program refinements.

FISCAL IMPACT
Funding for the V2X study was not included in the FY 2025-26 Adopted Budget.

Therefore, the staff is requesting appropriation in the amount of $200,000 as follows:
122 of 348
7 9c
Requesting Appropriation
Amount From (Account String) To (Account String) Funding Source $200,000 GL 24217-2910-000 GL: 45512-2910-
GWP-4800-P0000
Public Benefits Fund
If proven feasible, future funding for this program will be included in the annual budget for each respective year.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
This item is not subject to the California Environmental Quality Act (CEQA) review as the action requested is not a project as defined by, and for the purposes of, CEQA.

CAMPAIGN DISCLOSURE
Not applicable.

ALTERNATIVES TO STAFF RECOMMENDATION
1: Direct staff to return for further revisions before implementation. 2: Consider any other alternative not proposed by staff.

ADMINISTRATIVE ACTION
Submitted by:

Scott K. Mellon, P.E., General Manager - Glendale Water and Power Prepared by:

Adrine Isayan, Assistant General Manager - Finance & Risk Management Ruzan Soloyan, Clean Energy Officer - Power Management
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: CC Resolution 25-95 (without exhibit since the exhibit is attached to this Report as Exhibit 2)
Exhibit 2: Clean Energy Programs Plan funded by the PBC and LCFS. 123 of 348
1 RESOLUTION NO. ________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GLENDALE,

CALIFORNIA, AUTHORIZING GLENDALE WATER & POWER STAFF TO

IMPLEMENT PROGRAMS CONSISTENT WITH THE OUTLINED REFINEMENTS TO

THE GLENDALE WATER & POWER CLEAN ENERGY PROGRAMS PLAN FUNDED

BY PUBLIC BENEFIT CHARGE (PBC) AND LOW CARBON FUEL STANDARD (LCFS) FOR FISCAL YEARS (FY) 25-26 AND FY 26-27
WHEREAS, the City of Glendale, through Glendale Water & Power ("GWP"), operates a municipal utility for the distribution of electrical energy to the citizens of the City of Glendale; and
WHEREAS, beginning in January 1, 1998, California State law mandated that each local publicly-owned electric utility establish a non-bypassable, usage-based charge on local distribution service of 2.85% to fund investments in programs "for the Public Good" (hereinafter "Public Benefit Charge" or "PBC"); and WHEREAS, the state-mandated Public Benefit Charge was adopted by the City Council and codified as Section 13.44.425 of the Glendale Municipal Code, 1995, effective January 1, 1998; and
WHEREAS, subsequent amendments to the California Public Utilities Code necessitated significant increases in PBC program production and reporting as well as new program offerings; and
WHEREAS, on June 24, 2025, the City Council adopted Resolution 25-95, which is attached as Exhibit 1 to the August 26, 2025 Report by the General Manager of GWP (“August 26, 2025 Report”), whereby Council adopted the PBC Programs Plan for FY 2025-2026 and FY 2026-2027 and the LCFS Programs Plan for FY 2025-2026 and 2026-2027 and also approved the Glendale Water & Power Clean Energy Programs Plan to Be Funded by PBC and LCFS, for FY 2025-2026 and 2026-2027; and WHEREAS, as directed by the City Council, staff has presented GWP’s approach for designing and implementing its clean energy portfolio in the August 26, 2025 Report; and
WHEREAS, the City Council has considered the August 26, 2025 Report and hereby approves GWP’s described and outlined approach for designing and implementing its clean energy portfolio presented in the August 26, 2025 Report and Exhibit 2 attached to said report; and

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:

SECTION 1: The City Council has reviewed the August 26, 2025 Report and hereby authorizes GWP staff to implement the programs consistent with the outlined refinements to the Glendale Water & Power Clean Energy Programs Plan funded by the Public Benefit Charge (PBC) and Low Carbon Fuel Standard (LCFS) for Fiscal Years 124 of 348
2 (FY) 25-26 and FY 26-27 as presented in the August 26, 2025 Report and in Exhibit 2 attached to said report.

SECTION 2. The City Council also authorizes GWP to conduct a study in support of the V2X pilot program as outlined in the August 26, 2025 Report.

SECTION 3: The City Manager or his designee is hereby authorized to execute such agreements, amendments, task orders, and other documents as needed to implement the programs approved by Resolution 25-95 and this Resolution. The form of such agreements, amendments, task orders, and other documents shall be subject to the review and approval of the City Attorney.

SECTION 4: The City Council does hereby authorize the City Manager or his designee to move appropriations without limit between detail accounts comprising the budget detail of any single budget appropriation for the various programs approved by Resolution 25-95 and this Resolution.

Adopted by the Council of the City of Glendale on this ___ day of _________, 2025. ________________________________
Mayor
ATTEST:
_____________________________________
City Clerk
125 of 348
4 STATE OF CALIFORNIA ) SS.

COUNTY OF LOS ANGELES )
I, Suzie Abajian PhD, City Clerk of the City of Glendale, hereby certify that the foregoing Resolution No. _______________ was adopted by a majority vote of the Council of the City of Glendale, California, at a regular meeting held on the ______ day of ______________________, 2025, and that the same was adopted by the following vote:

Ayes:

Noes:

Absent:

Abstain:
________________________
City Clerk
126 of 348
RESOLUTION NO.

RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALE

MAKING AN APPROPRIATION
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:

SECTION 1: That the sum of $200,000 is hereby appropriated and/or transferred from the following accounts to the following accounts:

ACCOUNTS DESCRIPTION FROM TO
24217-2910-GWP-0000 Electric Public Benefit AB189O, Public $200,000 Benefit Fund, Glendale Water & Power
45512-2910-GWP-4800-P0000 Public Benefit Programs, Public Benefit $200,000 Fund, Glendale Water & Power, GWP Public
Benefits
To appropriate funding for a vehicle-to-everything (V2X) study supporting a potential pilot program.

SECTION 2: The Director of Finance is authorized to make such other revisions, individual appropriation line-items, changes in summaries, fund totals, grand totals, and other portions of the budget document asnecessary to reflect and implement the changes specified in this resolution.

SECTION 3: The City Clerk shall certify to the adoption of this Resolution.

Adopted this day of
2025.

Mayor
ATTEST:

CITY OF GLENDALE
DATE 8/21/2025 APPROVED AS TO FINANCIAL
City Clerk PROVISION FOR $ 200,000
Director of Finance

STATE OF CALIFORNIA)COUNTY OF LOS ANGELES) SS
CITY OF GLENDALE)I, Suzie Abajian, City Clerk of the City of Glendale, do hereby certify that the foregoing ResolutionNo. was adopted by the Council of the City of Glendale, California, at a regular meeting held on the__________ day of
2025, and that the same was adopted by the following vote:

Ayes:

Noes:

Absent:

Abstain:

City Clerk 127 of 348
EXHIBIT 1
128 of 348
129 of 348
130 of 348
131 of 348
Exhibit 1 to the Resolution of the City Council approving the GWP Public Benefit Programs Plan and Low Carbon Fuel Standard Programs Plan for FY 2025-2026 and FY 2026-2027 and Authorizing the City Manager to Execute Agreements to Implement said Programs.

Exhibit 2

CLEAN ENERGY PROGRAMS PLAN
Funded by the Public Benefit Charge (PBC) and
Low Carbon Fuel Standard (LCFS)
Prepared for Fiscal Years 2025-2026 & 2026-2027
132 of 348
Exhibit 1 to the Resolution of the City Council approving the GWP Public Benefit Programs Plan and Low Carbon Fuel Standard Programs Plan for FY 2025-2026 and FY 2026-2027 and Authorizing the City Manager to Execute Agreements to Implement said Programs.

TABLE OF CONTENTS
PBC-FUNDED PROGRAMS SUMMARY........................................................ 2 ENERGY-WATER EFFICIENCY AND CONSERVATION PROGRAMS ..............3 Home Energy and Water Saving Rebates............................................................................. 3 Direct Install Turf Replacement Program for Disadvantaged Communities..................... 5 Home Energy and Water Saving Upgrades .......................................................................... 6 Home Energy Reports and Online Energy Usage Access.................................................. 6 Tree Power ................................................................................................................................. 7 Business Energy Solutions....................................................................................................... 8 Business Customer Engagement Portal (New) .................................................................... 8 Commercial Energy and Water Savings Rebates (New) .................................................. 10 Small Business Direct Installations (New)........................................................................... 12 In School Energy and Water Conservation Education....................................................... 12 ENERGY ASSISTANCE PROGRAMS........................................................................13 Glendale Care .......................................................................................................................... 13 Helping Hand............................................................................................................................ 13 Guardian.................................................................................................................................... 13 RENEWABLE ENERGY PROGRAMS .......................................................................14 Photovoltaic (PV) and Energy Storage (ES) Interconnection Application Portal (PowerClerk)............................................................................................................................. 14 Off-Peak EV Charging Incentives ......................................................................................... 14 Demand Response (NEW)..................................................................................................... 15

LCFS-FUNDED TRANSPORTATION ELECTRIFICATION PROGRAMS
SUMMARY ......................................................................................................... 16 Electric Vehicle Supply Equipment (EVSE) Infrastructure ................................................ 16 Residential EV Charging Station Rebates........................................................................... 17 Commercial and Multi-Family EV Charging Station Rebates........................................... 18 Pre-Owned EV Rebate Program........................................................................................... 18 Clean Fuel Rewards Program ............................................................................................... 19 Web-Based EV Customer Awareness Platform ................................................................. 19 EV and E-Bike Guest Drive Events (New)........................................................................... 20 E-Bike Rebates ........................................................................................................................ 21 Electric Leaf Blower Rebates................................................................................................. 21 Vehicle to Grid Study (New)................................................................................................... 21 133 of 348
2 PBC-FUNDED PROGRAMS SUMMARY
Table 1 below summarizes the proposed annual budget for PBC-funded programs budget for the period from July 1, 2025, through June 30, 2027. The proposed PBC budget is $9.35 million for FY 2025-2026, and $11.4 million for FY 2026-2027, supporting a total of 15 programs.

TABLE 1
Nearly all existing programs will continue under the proposed 2-year plan, with two exceptions:
(1) the Online Store for Energy Efficiency and Water Measures, which has concluded due to the expiration of the contract with Franklin Energy Services, LLC, and (2) the Behavioral Demand Response program, due to timing constraints in the contracting cycle. Despite these changes, the proposed plan introduces several new programs and includes a few programmatic changes to existing programs, all of which are outlined in this exhibit.

PROGRAMS FY 25-26 FY 26-27
Salaries and Benefits, Mainenance and Operations,
City Fund Allocations $ 1,605 $ 1,605
Home Energy and Water Saving Rebates $ 200 $ 200
Home Energy and Water Saving Upgrades $ 500 $ 1,000
Home Energy Reports $ 655 $ 655
Tree Power $ 60 $ 60
Business Energy Solutions $ 350 $ 350
Business Customer Engagement Portal (NEW) $ 179 $ 179
Commercial Rebates (NEW) $ 150 $ 250
Small Business Direct Installation Program (NEW) $ 200 $ 500 In School Conservation Education $ 85 $ 85

ENERGY ASSISTANCE PROGRAMS
Glendale Care $ 4,670 $ 4,670
Helping Hand $ 30 $ 30
Guardian $ 120 $ 120

RENEWABLE ENERGY PROGRAMS
PV and ES Interconnection $ 50 $ 50
Demand Response (NEW) $ - $ 1,000
Off-Peak EV Charging Incentives $ 500 $ 700
TOTAL PROPOSED BUDGET $ 9,354 $ 11,454
PROJECTED BEGINNING PBC FUND BALANCE $ 18,843 $ 20,127
PROJECTED PBC REVENUES $ 10,638 $ 9,384
PROJECTED PBC EXPENDITURES $ (9,354) $ (11,454)
PROJECTED ENDING PBC FUND BALANCE $ 20,127 $ 18,058

ADMINISTRATION

ENERGY-WATER EFFICIENCY AND CONSERVATION PROGRAMS
PROPOSED BUDGET ($1000s)
134 of 348
3 ENERGY-WATER EFFICIENCY AND CONSERVATION PROGRAMS
Home Energy and Water Saving Rebates
This program offers incentives to encourage the purchase of approved energy and water saving appliances and devices through an online application portal.

Table 2 below outlines a proposed two-year budget of $300,000 to provide approximately 1,600 rebates to customers, and $100,000 to fund the online application portal through June 30, 2027.

TABLE 2
Table 3 below outlines the list of proposed rebate measures and rebate amounts.

TABLE 3
Electric Measure Rebate Amount
Energy Star Electric Clothes Dryer $200
Energy Star Dishwasher $50
Energy Star Electric Heat Pump Clothes Dryer $400
Energy Star Variable Speed Pool Pump $400
Solar Attic Fan $100
Whole House Fan $100
Table 4 below outlines the list of rebate measures and increased rebate amounts that are currently being funded by the $3.4 million reallocated over-collected PBC fees as established by Resolution 24-164.

The following adjustments will be made effective July 1, 2025:
• Energy Star (gas powered) Central AC will be removed
• Energy Star Electric Heat Pump Water Heater rebates will be increased from $1,000 to $4,000
• Energy Star Heat Pump/Mini-Split Heat Pump AC rebates will be increased from $500 to $1,000 per ton
• Electric Panel Upgrade (for Electrification) rebates of up to $1,000 will be added These adjusted rebates will remain in effect until the over-collected funds are exhausted, at which time the original rebate amounts will be re-established and will be funded under the annual PBC budget.

FY 25-26 FY 26-27
Projected Energy Rebates 800 800
Proposed Budget $ 200,000 $ 200,000
Rebates Funding $ 150,000 $ 150,000
Online Application Portal $ 50,000 $ 50,000
Home Energy Saving Rebates 135 of 348
4 TABLE 4
GWP may add new items to the rebate list as opportunities arise and as the budget allows.

The rebates are available to GWP residential electric customers and owners of rental units occupied by GWP electric customers for eligible measures purchased within the prior 12 months.

The online portal will continue to be managed and operated by Electric & Gas Industries Association (EGIA). The EGIA online portal allows GWP to receive and process rebate applications online.

In addition to energy rebates, GWP residential customers can also access regional water conservation programs offered by the Metropolitan Water District (MWD), a regional wholesale water supplier that imports water from the Colorado River and Northern California. As one of MWD’s 26 member agencies, GWP may choose to customize these rebates by adding supplemental funding to address local needs. This upcoming program will provide supplemental funding to enhance MWD’s regional rebates, further promoting energy-water efficiency in Glendale.

Table 5 outlines a proposed two-year budget of $80,000 to support rebates for approximately 1,000 residential customers.

TABLE 5
Table 6 below outlines the measures and rebate amounts, effective August 1, 2025, and through June 30, 2027.

TABLE 6
Electric Measure Rebate Amount
Energy Star Ceiling Fan $100
Electric Range $400
Electric Range/Oven Combo $400
Electric Wall Oven $400
Energy Star Electric Heat Pump Water Heater $4,000
Energy Star Freezer $200
Energy Star Central Heat Pump or Mini-Split Heat Pump HVAC $1,000 per ton Energy Star Refrigerator $200
Energy Star Room Air Conditioner $400
Electric Panel Upgrade (for Electrification) $1,000
FY 25-26 FY 26-27
Projected Water Rebates 500 500
Proposed Budget $ 40,000 $ 40,000
Home Water Saving Rebates 136 of 348
5 Direct Install Turf Replacement Program for Disadvantaged Communities In collaboration with MWD, GWP will participate in MWD’s grant funded small-scale direct install turf replacement program for disadvantaged communities.

MWD has secured grant funding from USBR, which will provide funding to 10 turf replacements and drought tolerant landscape installations in Glendale. They will also be working with Santa Ana and San Ferando to complete 10 projects each under this same grant funding. MWD will cover all project costs, including administering the program, design work, installations, professional photography, initial maintenance, etc. GWP will assist MWD with marketing the program to identify 10 single family owner-occupied sites. The results of these 10 completed projects will be used to create informative educational materials to promote turf replacement, water conservation, and educate our community about the benefits and beauty of drought-tolerant (potentially native) landscapes.

MWD is currently working on procurement and expects to identify contractors by Summer 2025.

Once contractors are chosen, GWP will begin site selection and outreach.

TABLE 7
Water Measure MWD Rebate GWP Rebate Total Rebate
Premium High Efficiency Toilet $40 $60 $100
Weather Based Irrigation Controller (per unit; < 1 acre) $80 $70 $150 Weather Based Irrigation Controller (per station; > 1 acre) $35 $15 $50 Rotary Multi-Stream Nozzle $2 $2 $4
Turf Replacement (per square foot) $3 $0 $3
Hose Bib $35 $15 $50
Soil Moisture Sensor (per unit; < 1 acre) $80 $20 $100
Soil Moisture Sensor (per station; > 1 acre) $35 $15 $50 Rain Barrel $35 $0 $35
High Efficiency Clothes Washer $85 $115 $200
Cistern - Small (200 - 500 gallons) $250 $0 $250
Cistern - Medium (501 - 999 gallons) $300 $0 $300
Cistern - Large (1,000+ gallons) $350 $0 $350
Flow Monitoring Device Pilot $100 $100 $200
FY 25-26 FY 26-27
Projected Participants 5 5
Total Proposed Budget (fully
covered by grant funds)
~$82,000 ~$82,000
Direct Install Turf Replacement Program 137 of 348
6 Home Energy and Water Saving Upgrades
The Home Energy and Water Saving Upgrades program will evaluate the energy and water efficiency of customers’ homes, install energy and water saving devices, and provide recommendations for additional improvements. The program will evaluate measures such as lighting, HVAC systems, attic insulation, temperature settings, appliances, and water flow rates at sinks, showers and toilets. Additionally, it will install several measures at no cost to the customer, including LED lights, window films, sensors, timers, HVAC maintenance, low-flow showerheads, faucet aerators, toilet displacement devices, and toilet flappers. Additionally, the program will offer concierge services to help customers access additional local, state, and federal incentives for further energy and water upgrades.

Table 8 below outlines a proposed two-year budget of $1,500,000 to provide energy and water saving surveys and installations for approximately 600 households through June 30, 2027.

TABLE 8
The program will be available to GWP residential electric customers.

This program will be delivered through one of the vendors selected by SCPPA via a competitive Request for Proposal (RFP) process. A separate Task Order under the SCPPA-vendor contract will be prepared to document the specific services to be provided for Glendale, along with the associated costs and a not-to-exceed amount.

Home Energy Reports and Online Energy Usage Access
GWP has been offering Home Energy Reports since 2009. This initiative is built on a proprietary technology platform that integrates usage data with an array of third-party housing, GIS, and demographic information to generate personalized insights into households’ energy use. The software analytics engine provides messaging with specific, targeted action steps for each household to help customers reduce their electricity consumption.

Since 2011, the program has offered online access to electric usage information from their digital meters. By utilizing the platform, customers can track their electricity consumption at monthly, weekly, daily, or hourly intervals.
• Home Energy Reports (HER): Provides annual printed and emailed reports to residential customers on their energy use.
• Online Energy Usage Access: Offers online access to residential customers to review their energy usage in monthly, weekly, daily or hourly intervals.

FY 25-26 FY 26-27
Projected Participation 200 400
Total Proposed Budget $ 500,000 $ 1,000,000
Proposed
Home Energy and Water Saving Upgrades 138 of 348
7 • High Bill Alerts (HBA): Notifies customers before the end of a billing period if their energy use is trending high, along with tips to help reduce consumption. • Weekly Energy Updates (WEU): Delivers a weekly email report to customers informing them of their energy usage patterns, trends, and projected costs or consumption. • Solar Update Notifications (SUNs): Sends a series of six emails to new solar customers during their first year. These messages provide timely information and instructions that help customers understand their solar bills and acclimate them to the solar experience. • Solar Web Insights: Offers an online dashboard with features including monthly and annual solar billing overview, net electricity usage and production graphs, billing trends and comparison, solar savings insights, and other tips.

Table 9 below proposes a two-year budget of $1,310,000 through June 30, 2027.

TABLE 9
The current contract with Oracle America, Inc. is set to expire on June 30, 2025. GWP proposes to amend the current contract to extend services for an additional two years, to provide services through June 30, 2027. This extension would be a Sole Source Procurement process directly with Oracle America, Inc.

Tree Power
Tree Power supports a cleaner, healthier, and more beautiful Glendale while helping residents save energy. Through the Tree Power program, eligible may receive up to three shade trees, along with stakes, ties, and arbor guards, at no direct cost to the customer.

Shade trees offer a wide range of benefits for both the environment and community. By blocking sunlight and releasing moisture, these trees help cool the surrounding areas, reducing the need for air conditioning and lowering energy bills. Shade trees also improve air quality by absorbing pollutants and producing oxygen, while their roots help prevent soil erosion and improve water retention. On average, a mature tree can intercept between 500 to 1,000 gallons of rainwater annually. Additionally, shade trees increase property values, and enhance neighborhood aesthetics, making communities more pleasant and inviting.

Table 10 below outlines a two-year budget of $120,000 to provide arborist services and 900 trees to GWP customers through June 30, 2027.

FY 25-26 FY 26-27
Home Energy Reports Up to 54,000 customers Up to 54,000 customers Weekly Energy Updates and High Bill Alerts Up to 50,000 customers Up to 50,000 customers Energy Management Web Up to 81,000 customers Up to 81,000 customers Solar Web Insights Up to 5,000 customers Up to 5,000 customers Total Proposed Budget $ 655,000 $ 655,000
Home Energy Reports 139 of 348
8 TABLE 10
GWP has engaged the services of an arborist and tree supplier through standard procurement processes to support the program. Participation is on a first-come, first-served basis.

GWP proposes to enter into a direct contract between the Craig Crotty Arbor Culture LLC and the City of Glendale to provide arborist services for the program. In addition, GWP will enter into a Purchase Order with Arbor Nursery Plus for the procurement of trees for the Tree Power program.

GWP is considering redesigning the Tree Power program by consolidating its services under a single contractor, such as Arbor Day Foundation. This would streamline program operations, improve customer experience, and enable GWP to extend it to a larger customer base, ultimately increasing participation and impact.

Business Energy Solutions
Business Energy Solutions (BES) provides incentives for large and medium businesses to complete pre-approved energy saving projects. Local public and private schools are also eligible to participate in this program.

Table 11 below proposes a two-year budget of $700,000 to fund incentives for approximately 20 retrofit projects through June 30, 2027.

TABLE 11
Rebates for approved retrofit projects are limited to 40% of installed cost with an overall incentive cap of $100,000 per customer per fiscal year. In no case will a PBC incentive exceed the value of saved energy over the life of the measures assuming $0.06 per kilowatt-hour saved.

Business Customer Engagement Portal (New)
The program provides business customers web-access to their electric usage information for their digital meters. The tool empowers business customers to manage their energy usage with this online solution.

FY 25-26 FY 26-27
Projected Trees 450 450
Proposed Budget $ 60,000 $ 60,000
Tree Power
FY 25-26 FY 26-27
Projected Participants 10 10
Proposed Budget $ 350,000 $ 350,000
Business Energy Solutions 140 of 348
9 The Business Customer Engagement Portal is an online tool for understanding and managing a business’s energy use. It presents clear, actionable information about a business user’s account, displaying the most important data in a web interface that is easy to navigate and understand. It also provides energy efficiency tips and projects tailored to each customer, as well as trends and insights that empower GWP staff to answer customer questions before they are asked.

The portal provides business customers with an array of engaging web features built on a common platform to simplify implementation across customer segments. • Dashboard - provides a high-level summary of an account's energy information and includes key insights around recent usage, personalized energy solutions, and tools for inviting additional users.
• Energy Charts - Charts that display electric usage, energy cost, demand, load duration, and other types of energy information. All charts are interactive and can be configured by the user to display different billing periods, time frames, and comparisons. • Solutions - Low-cost, no-cost, or capital improvement recommendations displayed to a business user to help reduce energy usage and save money. Solutions are displayed by load category, such as Heating, Cooling, Ventilation, Lighting, Office Equipment, and so on. • Analysis - Displays a summary of user-friendly analytics that highlight critical information around energy use and costs.
• User and Account Profile - Allow the customer to manage their accounts and meters and invite users to the account. Users can add details about the facility in the Business Profile to customize their energy use breakdown and tailor the solutions available. • Notifications - The portal sends outbound email notifications to customers. • Resources - Provides frequently asked questions and a glossary of energy terms to help the customer better understand their energy data. It also provides links, contact information, and engagement opportunities with other utility programs. • Multi-Account Functionality - Business customers often have more than one utility account to manage. Users will have access to their multiple accounts in their user profile and will be able to toggle between each account
Table 12 below proposes a two-year budget of $358,000 through June 30, 2027.

TABLE 12
The current contract with Oracle expires on June 30, 2025. As such, GWP proposes to amend the current Oracle America, Inc. contract to an additional two-years to provide services through June 30, 2027. GWP proposes to engage through a Sole Source Procurement process directly with Oracle America, Inc. to provide services through June 30, 2027.

FY 25-26 FY 26-27
Proposed Budget $ 179,000 $ 179,000
Business Customer Engagement
(Annual Subscription for Web & High Bill Alerts)
141 of 348
10 Commercial Energy and Water Savings Rebates (New)
The program will offer rebates for approved energy and water saving appliances and devices through an online application portal.

Table 13 below outlines a proposed two-year budget of $400,000 to fund proposed commercial rebates listed in Table 14.

TABLE 13
TABLE 14
To implement energy measures above, GWP proposes contracting with Clean Power Research for the PowerClerk application portal through a SCPPA participation agreement. A separate SCPPA-Vendor Task Order will be prepared outlining Glendale’s services and cost, including a not-to-exceed amount.

FY 25-26 FY 26-27
Projected Participants TBD TBD
Proposed Budget $150,000 $250,000
Electric Rebates $100,000 $200,000
Online Application Portal $ 50,000 $ 50,000
Commercial Electric Rebates
Electric Measure Rebate Amount
Cooktop $500
Electric Hand-Wrap Machine $500
Griddle $500
Conveyor Toaster $500
Hot Food Holding Bins $500
Insulated Hot Food Holding Cabinet $500
Radiant Conveyor Toaster $500
Reach-In Refrigerator or Freezer $500
Refrigerated Chef Base $500
Soup Well $500
Steam Table $500
Heat Pump Air Conditioner, per ton $500
Automatic Conveyor Broiler $2,000
Combination Oven $2,000
Convection Oven $2,000
Fryer $2,000
Deck Oven $2,000
Door Type Dishwasher $2,000
Undercounter Dishwasher $2,000
Heat Pump Water Heater $4,000
142 of 348
11 In addition, GWP is looking to enhance its water conservation effort. Since Glendale depends on imported water purchased from the Metropolitan Water District (MWD), a regional water supplier that imports water from the Colorado River and Northern California. As a member agency, GWP can enhance MWD’s regional rebate programs with supplemental funding. To increase historically low program participation among GWP commercial customers, GWP proposes adding funding to support greater adoption on energy-water saving devices.

Table 15 outlines a proposed two-year budget of $120,000 to support rebates for approximately 200 commercial customers, effective August 1, 2025, and through June 30, 2027.

TABLE 15
Table 16 below outlines measures and rebate amounts.

TABLE 16
FY 25-26 FY 26-27
Projected Participants 100 100
Proposed Budget $ 60,000 $ 60,000
Commercial Water Rebates
Water Measure MWD
Rebate
GWP
Water Rebate
GWP
Electric Rebate
Total
Rebate
Plumbing Flow Control (/pair) $10 $10 N/A $20
Laminar Flow Restrictor $10 $10 N/A $20
CII Premium HET $40 $60 N/A $100
Multi-Family Premium HET $40 $60 N/A $100
Zero/Ultra Low Water Urinal $200 $200 N/A $400
Weather Based Irrigation Controller $35 $15 N/A $50
Central Computer Irrigation Controller $35 $15 N/A $50
Soil Moisture Sensor $35 $15 N/A $50
Hose Bib Irrigation Controller $35 $15 N/A $50
Large Rotary Nozzle $13 $7 N/A $20
Rotary Multi-Stream Nozzle $2 $3 N/A $5
In-Stem Flow Regulator $1 $1 N/A $2
pH Cooling Tower Controller $1,750 $250 N/A $2,000
Cooling Tower Conductivity Controller $625 $375 N/A $1,000 Dry Vacuum Pump (/1/2 hp) $125 $125 N/A $250
Steam Cooker $485 $0 $1,515 $2,000
Air-cooled Ice Making Machine $1,000 $0 $1,000 $2,000
Turf Replacement $2 $0 N/A $2
Tree Rebate (up to 5 trees) $100 $0 N/A $100
Flow Monitor Device $100 $0 N/A $100
Irrigation Master Valve $100 $0 N/A $100
Irrigation Flow Sensor $100 $0 N/A $100
Combination Master Valve / Flow $200 $0 N/A $100
Food Defrosting Equipment $800 $0 N/A $800
143 of 348
12 Small Business Direct Installations (New)
This program will provide small business customers with comprehensive no-cost energy audits, written audit reports, energy education, free installation of cost-effective energy conservation measures, and no-cost energy services support should the participant wish to install additional energy conservation measures at their own expense.

Table 17 below proposes a two-year budget of $700,000 to fund approximately 140 retrofit projects through June 30, 2027.

TABLE 17
This program will be offered through one of the vendors selected by SCPPA through a competitive Request for Proposal (RFP) process to provide commercial audit and installation services for SCPPA members. A separate Task Order to the SCPPA-Vendor contract will be prepared documenting the services to be provided for Glendale and Glendale’s cost, including a not-to-exceed amount.

In School Energy and Water Conservation Education
This program works on a cooperative basis with Glendale Unified School District and private schools within Glendale. It seeks to educate sixth grade science students in the areas of energy and water conservation through a “hands on” curriculum that includes in-home installation of conservation devices.

Table 18 below proposes a two-year budget of $170,000 to provide services to approximately 2,800 students through June 30, 2027.

TABLE 18
GWP proposes working with Tinker LLC through a participation agreement with SCPPA. A separate Task Order to the SCPPA-Vendor contract will be prepared documenting the services to be provided for Glendale and Glendale’s cost, including a not-to-exceed amount.

FY 25-26 FY 26-27
Projected Participants 40 100
Proposed Budget $200,000 $500,000
Small Business Direct Installations
FY 25-26 FY 26-27
Projected Participants 1,400 1,400
Proposed Budget $85,000 $85,000
In School Conservation Education 144 of 348
13 ENERGY ASSISTANCE PROGRAMS
Glendale Care
The Glendale Care program provides a $35.00 monthly electric bill discount to eligible GWP customers. The monthly discount was increased from $23.50 to $35.00 as of January 1, 2024.

The income eligibility guidelines are 250% of Federal Poverty Guidelines issued annually by the U.S. Department of Health and Human Services and published in the U.S. Federal Registrar.

Table 19 below proposes a two-year budget of $9.34 million to provide bill discounts to approximately 12,000 low-income customers through June 30, 2027.

TABLE 19
Helping Hand
Helping Hand assists eligible low-income customers who are experiencing a temporary financial emergency and having trouble paying for their utility services by providing up to $150 towards a bill payment or deposit. The income eligibility guidelines are 250% of federal poverty guidelines issued annually by the U.S. Department of Health and Human Services and published in the U.S. Federal Registrar.

Table 20 below proposes a two-year budget of $60,000 to provide Helping Hand assistance to approximately 400 low-income customers through June 30, 2027.

TABLE 20
Guardian
Guardian provides monthly bill discounts to customers with household members using lifesaving medical equipment or suffering from afflictions requiring special space conditioning.

Discounts are based on the estimated electric consumption of the medical equipment. For administrative purposes, this program is categorized as low income. Non-low-income participants will continue to be funded through the Electric Services fund. Participants that are enrolled in Glendale Care, thus have been determined to be low-income, will be funded by PBC.

FY 25-26 FY 26-27
Projected Participants 12,000 12,000
Proposed Budget $ 4,670,000 $ 4,670,000
Bill Discounts $ 4,620,000 $ 4,620,000
Application Portal $ 50,000 $ 50,000
Glendale Care
FY 25-26 FY 26-27
Projected Participants 200 200
Proposed Budget $ 30,000 $ 30,000
Helping Hand 145 of 348
14 Table 21 below proposes a two-year PBC budget of $240,000 to provide Guardian assistance to approximately 1,200 customers through June 30, 2027.

TABLE 21

RENEWABLE ENERGY PROGRAMS
Photovoltaic (PV) and Energy Storage (ES) Interconnection Application Portal (PowerClerk)
PowerClerk is a cloud-based software platform developed by Clean Power Research that streamlines the management of utility programs related to distributed energy resources (DERs), such as solar, energy storage, and electric vehicle infrastructure. This online service allows GWP staff to configure and manage workflows, forms, communications, and reporting without requiring IT involvement. GWP first started using PowerClerk in 2016 to improve and streamline the processing of Solar Incentive Applications (under SB-1). After the end of the incentive program, PowerClerk has been used to process PV and ES applications.

GWP proposes to contract with Clean Power Research through a participation agreement with SCPPA. A separate Task Order to the SCPPA-Vendor contract will be prepared documenting the services to be provided for Glendale and Glendale’s cost, including a not-to-exceed amount.

Table 22 below proposes a two-year budget of $100,000 to provide the PowerClerk online solar and energy storage interconnection application portal through Clean Power Research.

TABLE 22
Off-Peak EV Charging Incentives
Load shifting and demand response help optimize the use of renewable energy by moving energy consumption to times when clean energy supply is abundant.

This program uses AMI Smart Meters to promote EV charging at night. Participants are incentivized to charge their EV’s during off-peak hours. The contractor verifies off-peak charging compliance by analyzing AMI Smart Meter data through analytics software.

FY 25-26 FY 26-27
Projected Participants 600 600
Proposed Budget $ 200,000 $ 200,000
PBC $ 120,000 $ 120,000
Electric Services $ 80,000 $ 80,000
Guardian
FY 25-26 FY 26-27
Projected Participants 500 500
Proposed Budget $ 50,000 $ 50,000
PV and ES Interconnection Application Portal 146 of 348 15 This effective EV load management program works with any vehicle and charger. Smart chargers, in-car devices or other hardware are not required. This is a turn-key solution program, with the contractor processing enrollments and monitoring participants’ charging behavior.

In FY 2025-2026, the incentive will increase to $15/month, a 25% boost from the previous two years amount, and will rise again to $20/month in FY 2026-2027. GWP will evaluate the effectiveness of the monthly incentive and may adjust the amount if needed and as budget allows. Additionally, incentive issuance frequency will shift from annual to semi-annual.

Table 23 below proposes a two-year budget of $1.2 million to provide incentives for an estimated 2,050 EVs through June 30, 2027.

TABLE 23
GWP proposes to work with Sagewell, Inc. through a participation agreement with SCPPA. A separate Task Order to the SCPPA-Vendor contract will be prepared documenting the services to be provided for Glendale and Glendale’s cost, including a not-to-exceed amount.

Demand Response (NEW)
Demand response programs can help adjust consumer demand based on real-time energy availability, help balance supply and demand, and reduce reliance on fossil fuel-based plants.

This program will offer residential and small commercial customers an upfront incentive for enrolling their qualifying smart thermostat in the program and an annual incentive for participating in the peak events called during the program season. The smart thermostat will curb energy use from the customer’s air conditioner or heat pump during peak events to reduce electric grid load and keep energy costs low.

GWP will be exploring different options to implement this program either through a participation agreement with SCPPA or direct contracting with a selected vendor after an RFP process.

Table 24 below proposes a two-year budget of $1,000,000 to implement a demand response program.

TABLE 24
FY 25-26 FY 26-27
Projected Participants 1,690 2,050
Proposed Budget $ 500,000 $ 700,000
Off-Peak EV Charging Incentives
FY 25-26 FY 26-27
Projected Participants 0 TBD
Proposed Budget $ - $1,000,000
Demand Response 147 of 348
16 LCFS-FUNDED TRANSPORTATION

ELECTRIFICATION PROGRAMS SUMMARY
The following transportation electrification programs will be funded through the sales of Low Carbon Fuel Standard (“LCFS”) credits, which Glendale earns on a quarterly basis. The LCFS program, administered by the California Air Resources Board, issues credits that can be monetized and reinvested in transportation electrification initiatives. Glendale will use these proceeds to fund several transportation electrification programs.

Table 25 below summarizes the proposed annual LCFS program budget for the period from July 1, 2025, through June 30, 2027. The proposed LCFS budget is $2.08 million for FY 2025-2026 and $2.8 million for FY 2026-2027, supporting a total of nine transportation electrification programs.

TABLE 25
PROPOSED BUDGET ($1000s)
TRANSPORTATION ELECTRIFICATION PROGRAMS FY 25-26 FY 26-27 EVSE Infrastructure $ 500 $ 1,000
Residential EV Charging Station Rebate Program $ 75 $ 75 Commercial & Multi-Family EV Charging Station Rebate Program $ 1,000 $ 1,000 Pre-Owned EV Rebate Program (New) $ - $ 500
Clean Fuel Rewards Program $ 300 $ -
Web Based EV Customer Awareness Platform $ 27 $ 27
Electric Vehicle and Electric Bicycle Guest Drive Events $ 140 $ 50 Electric Bicycle Rebate Program $ 34 $ 44
Electric Leaf Blower Rebate Program $ 6 $ 6
Vehicle to Grid Study (New) $ - $ 150
TOTAL PROJECTED EXPENDITURES/BUDGET $ 2,082 $ 2,852
Electric Vehicle Supply Equipment (EVSE) Infrastructure The number of electric vehicles (EVs) in the City of Glendale has grown substantially in recent years. In response, GWP plans to expand its EV charging infrastructure across the city. The goal is to develop a network of conveniently located charging stations within the City of Glendale that make EV travel in Glendale more accessible, reliable, and hassle free.

GWP’s transportation electrification efforts support state-level goals, including Governor Brown’s 2018 Executive Order B-48-18 which calls for 250,000 EV chargers and 10,000 directcurrent fast chargers by 2025, and Governor Newsom’s 2021 Executive Order N-79-20, which requires all new light-duty vehicle sales be zero emission by 2035. 148 of 348
17 As EV adoption increases, the changing needs of today’s drivers are also evolving. Access to charging at multi-unit dwellings (MUDs) and workplaces is becoming increasingly important.

Public charging in highly visible and convenient locations, such as curbside chargers in the public right-of-way, will play a vital role in ensuring equitable access to Electric Vehicle Supply Equipment (EVSE) infrastructure across all communities in Glendale.

EVSE site selection considers several factors, including power source proximity, the Americans with Disability Act (ADA) compliance, equipment availability, installation cost, public visibility, feasibility for DC fast chargers, and proximity to MUDs and disadvantaged communities.

As of May 2025, GWP has installed a total of 84 electric vehicle charging stations. GWP is currently in the process of establishing a new network service provider, service contract, and preventative maintenance program to improve charger uptime and customer experience. GWP is also preparing new contracts for EVSE design and construction to further expand its public EVSE infrastructure.

As previously noted, funding for the purchase and installation of EVSE is included in GWP’s capital budget and supported by revenue from LCFS credit sales.

Table 26 below proposes a two-year budget of $1,500,000 to support networking, maintenance and operations of the existing 84 charging ports, and the design, purchase, and installation of approximately 50 new public EV charging stations through June 30, 2027.

TABLE 26
Residential EV Charging Station Rebates
This program offers rebates of $200 for non-networked EV charging stations and $599 for networked EV charging stations. Customers who upgrade their electrical panel to support the EV charging station installation may receive an additional $800.

Customers enrolled in GWP’s Glendale Care low-income program are eligible for enhanced incentives of $300 for non-networked and $700 for networked EV charging stations, as well as an additional $1,000 for upgrading their electrical panel.

Table 27 below proposes a two-year budget of $150,000 to provide Level II EV charger rebates to approximately 200 residential customers through June 30, 2027.

FY 25-26 FY 26-27
Projected Incremental Installations 15 25
Projected Cumulative Installations 99 124
Proposed Budget $ 500,000 $ 1,000,000
Electric Vehicle Supply Equipment Infrastructure 149 of 348 18 TABLE 27
Commercial and Multi-Family EV Charging Station Rebates This program offers rebates of up to $50,000 or 50% (whichever is lower) of the project cost for commercial or multi-family building customers that install electric vehicle charging stations at their business or building. Customers can receive up to $75,000 or 75% (whichever is lower) of the project cost if they meet one of the following additional requirements:
• Project is in an income qualified housing structure that serves at least 80% of low-income residents as identified by the State of California.
• Project is at a non-profit organization recognized as having a tax-exempt status by the Internal Revenue Service.
• Project is in a disadvantaged community as designated by the California Environmental Protection Agency at CalEPA.ca.gov/envjustice/ghginvest/ • Project has at least one EV charging station that is publicly accessible. • Project includes at least one DC fast charger with a power output of 50 kW or greater.

Table 28 below proposes a two-year budget of $2,000,000 to provide EV charger rebates for an estimated 250 commercial and multi-family EV charging stations through June 30, 2027.

TABLE 28
Pre-Owned EV Rebate Program
The Pre-Owned EV Rebate Program will offer two rebate options, based on household income for customers who purchase or lease an eligible pre-owned EV. GWP electric customers will receive a $1,500 rebate for the purchase or lease of a pre-owned EV. Income-qualified applicants may receive a $2,500 rebate, depending on their household income.

Table 29 below proposes a two-year budget of $500,000 to provide rebates for an estimated 380 customers through June 30, 2027.

FY 25-26 FY 26-27
Projected Rebates 100 100
Proposed Budget $ 75,000 $ 75,000
Residential EV Charging Station Rebates
FY 25-26 FY 26-27
Projected Rebates 125 125
Proposed Budget $ 1,000,000 $ 1,000,000
Commercial EV Charging Station Rebates 150 of 348
19 TABLE 29
Clean Fuel Rewards Program
The Clean Fuel Rewards (CFR) program is a statewide point-of-sale initiative offering financial incentives to Glendale residents, at the point of sale, for the purchase or lease of new light-duty plug-in electric and hybrid electric vehicles. In partnership with California Air Resources Board (CARB) and local EV dealerships, Glendale provided up to $1,500 incentives to 2,983 Glendale residents from December 2020 through August 2022. The CFR program has been temporarily closed since September 1, 2022 due to higher than anticipated EV adoption. Utilities may still be required to contribute to this program, and the incentives may return at a later time in FY 25-26.

On June 30, 2020, the Glendale City Council authorized Glendale’s participation in the CFR Program (Resolution No. 20-90). The CFR Program is mandated by the State of California, to enable utilities to continue participating in the LCFS program. One of the CFR requirements is that Glendale must monetize 25% of its annual LCFS revenue the CFR Program.

Table 30 below proposes a one-year budget of $300,000 to provide incentives to Glendale residents through June 30, 2026. No funding is budgeted for FY 26-27 as this program is expected to conclude.

TABLE 30
Web-Based EV Customer Awareness Platform
This EV customer awareness platform offers many resources for prospective EV buyers and drivers to help them make informed decision. Features include:
• Catalog of new and used plug-in hybrid and electric vehicles. • Detailed vehicle information, including acquisition cost, specifications, environmental impacts, comparisons to other vehicles, and charging times • List of local, state, and federal EV incentives
• Local charging station map
• Catalog of home charging stations
• Map of dealerships in City of Glendale
Table 31 below proposes a two-year budget of $54,000 for website hosting and maintenance, and additional features designed to empower users to transition to EVs.

FY 25-26 FY 26-27
Projected Rebates 0 380
Proposed Budget $ - $ 500,000
Pre-Owned EV Rebates
FY 25-26 FY 26-27
Proposed Annual Contribution $ 300,000 $ -
Clean Fuel Rewards Program 151 of 348
20 TABLE 31
EV and E-Bike Guest Drive Events (New)
Electric Car Guest Drive events are standalone and turnkey events that offer residents the opportunity to test drive EVs without the pressure of dealership sales.

The vendor, Electric Car Insider, will plan, develop, and coordinate these events in collaboration with staff. The events will provide peer-to-peer learning experience, where prospective EV buyers can test drive EVs and receive information to support their decision to purchase or lease an EV. The event will be staffed by EV owners, who will share their firsthand knowledge about and answers questions from participants during the test drives. As part of the event the vendor will provide the following services:
• Event registration via web site
• Public exhibition
• Electric vehicles for test drives
• Event advertising assistance
• Analytical event reports
When possible, electric bike displays and potential test rides will be offered alongside the Electric Car Guest Drive events.

Table 32 below proposes a two-year budget of $190,000 to provide up to 4 Electric Car and Bike Guest Drive events by June 30, 2027.

TABLE 32
GWP executed a contract with Electric Car Insider in 2023 to provide up to three EV guest drive events per year. GWP also established partnerships with two local bike shops to provide E-Bike test rides for the events. Future events may include a collaboration between Glendale, Burbank, and Pasadena resulting in cost savings for each utility as indicated by the budget reduction from FY 25-26 to FY 26-27.

FY 25-26 FY 26-27
Maintenance and Reporting $ 27,000 $ 27,000
Proposed Budget $ 27,000 $ 27,000
Web-Based EV Customer Awareness Platform 152 of 348
21 E-Bike Rebates
This program provides a $300 rebate to residential customers who purchase a new electric bicycle. Customers enrolled in GWP’s Glendale Care low-income program are eligible for an enhanced rebate of $400.

Table 33 below proposes a two-year budget of $90,000 to provide e-bike rebates to an estimated 275 customers through June 30, 2027.

TABLE 33
Electric Leaf Blower Rebates
This program provides a $50 rebate to residential customers who purchase an electric leaf blower.

Table 34 below proposes a two-year budget of $12,000 to provide electric leaf blower rebates to 240 customers through June 30, 2027.

TABLE 34
Vehicle to Grid Study (New)
Vehicle-to-grid (V2G) technology allows EVs to supply power to devices, homes, buildings, or even the electric grid. Through V2G, EVs can help smooth facility energy demand by adjusting charging rates, storing excess solar energy generated during daytime hours, and providing energy directly to the grid to reduce overall demand. V2G technology has the potential to be used as a viable distributed energy resource. However, V2G requires EVs and charging stations to have this capability built in. Currently, very few EVs and charging stations support V2G.

Given the infancy of this technology and the limited availability of compatible vehicles and charging stations, GWP proposes conducting a study to explore how a V2G program could be implemented in Glendale. The findings from this study will help shape a potential future program and identify potential grants to fund the program.

FY 25-26 FY 26-27
Projected E-Bike Rebates 100 140
Proposed Budget $ 34,000 $ 44,000
E-Bike Rebates
FY 25-26 FY 26-27
Projected Leaf Blower Rebates 120 120
Proposed Budget $ 6,000 $ 6,000
Electric Leaf Blower Rebates 153 of 348
22 Table 35 proposes a one-year budget of $150,000 to perform a study on a V2G program for Glendale.

TABLE 35
GWP proposes to contract with a consultant through a direct contract between the City of Glendale and the consultant, or through a participation agreement with SCPPA. A separate Task Order under the SCPPA-Vendor contract will outline the specific services to be provided for Glendale, along with the associated costs, and a not-to-exceed amount.

FY 25-26 FY 26-27
Proposed Budget $ - $ 150,000
Vehicle to Grid Study 154 of 348
9d 25-88699

AGENDA ITEM

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL
Report: Dispensing with Competitive Bidding and Awarding a Contract for Operation and Maintenance of the City’s Schneider Electric Building Management Systems and Software including EcoStruxure and StruxureWare Building Operations / Andover Continuum (Andover)

1. Resolution dispensing with competitive bidding and authorizing the City Manager or a designee to execute a contract with Schneider Electric Buildings Americas, Inc., (Schneider Electric) for the operation and maintenance of the city’s Andover Building Management Systems for 5 years in an amount not to exceed $825,000.

COUNCIL ACTION

EXECUTIVE SUMMARY
The City of Glendale has used Andover building management systems and software for 24 years. These building management systems control digital heating, ventilation and air conditioning (HVAC) systems, secured access control and interior and exterior lighting systems. These commercial grade building management systems are proprietary, and Schneider Electric is the only vendor available to supply and support the wide range of needs of the city’s Andover systems including both the EcoStruxure and StruxureWare Building Operations / Andover Continuum building management systems and software.

Dispensing with competitive bidding is needed for a new 5-year operation and maintenance contract with Schneider Electric to continue these services.

RECOMMENDATION
Approve a resolution dispensing with competitive bidding and authorizing the City Manager or a designee to contract with Schneider Electric for the operation and maintenance of the city’s Andover Building Management Systems for 5 years in an amount not to exceed $825,000.

ANALYSIS
Digital HVAC automation was initially integrated to city facilities in 2001 to improve energy efficiency and systems controls at all major city facilities. This automation extends over the city’s network and allows for centralized, real-time building management including Item Type: Action Item
Approved for September 9, 2025 calendar
155 of 348
9d
25-88699
2 monitoring, alarming, adjusting, and diagnosing issues across all city facilities. This product was originally selected 24 years ago due to several factors including cost, experience, product support, project approach, architecture, potential customizations and user-friendly interface. This system has been upgraded many times over the years.

Since the initial installation, Andover has been integrated into nearly all significant city buildings including the Civic Center buildings, fire stations, libraries, police station, maintenance yards and the Beeline Maintenance Facility. Only the Alex Theater is on a different building management system, currently Sunbelt Controls. Staff has found the Andover system to be easy to use and effective in allowing staff from a single workstation or handheld device to monitor systems throughout the city, diagnose problems, make adjustments to HVAC settings and schedule building access. Andover includes an Energy Management System that provides the city with enhanced energy efficiency and cost savings by starting, stopping and sequencing large energy consuming equipment.

Further, the system controls and monitors ingress and egress at all city facilities including controlling door locks and manages interior and exterior lighting systems.

The city’s existing building management systems currently includes Schneider Electric’s building management software and extensive hardware and wiring in all city facilities. The hardware includes wiring, door locking mechanisms, access card readers, locking controllers, temperature sensors, air flow controllers, VAV controllers, AC and heat controllers, water temperature sensors, and HVAC central controllers.

Schneider Electric is the parent company of both the EcoStruxure and StruxureWare Building Operations / Andover Continuum products including both the hardware and software making up these complex systems. They are the only vendor available to support the full scope of needs for the city’s Andover systems. In the past, the city engaged in an ultimately unsuccessful request for proposals process for these same operation and maintenance services because these services are proprietary.

Over the past 24 years, the city had made a considerable investment in the Andover system including procured hardware, training and system development. Additionally, Schneider Electric’s newer EcoStruxure building management system was recently installed at the Beeline Maintenance Facility and Police Building meaning the city will have a continuing need for some operational and maintenance service from this firm for some time. It would be both impractical and expensive to consider initiating a new request for proposals process to replace this entire system all at one.

Due to the substantial value of the city’s existing Schneider Electric building management system infrastructure and the estimated capital cost exceeding $2 million to replace this system in addition to the training and development implementing a new system requires, continuing with a new operation and maintenance contract with Schneider Electric is the most economic option at this time by maintaining the Andover system already in place.

The currently system is effectively providing building management system services as intended and is meeting the needs of the city. Since it is in the best interest of the city to execute a new contract with Schneider Electric for building management services, the 156 of 348
9d
25-88699
3 City Council may dispense with competitive bidding under these circumstances.

The recommended amount for a new contract with Schneider Electric for operation and maintenance of the city’s Andover Building Management Systems for 5 years is $825,000.

This is a reduction in cost compared to the previous 5-year agreement of $895,000. Even though the labors rates and parts costs under the new contract are slightly higher, the prior contract included system expansion costs which are not part of this proposed contract. Staff does not plan to expand services under the new contract.

For city buildings on the older StruxureWare Building Operations / Andover Continuum, staff intends to initiate a new request for proposals process to select a new building management system for these facilities and eventually the entire city. Since upgrading these buildings from this older system to EcoStruxure, under the same Schneider Electric umbrella, will require a considerable investment in new wiring infrastructure, new hardware and other substantial expenses, a new request for proposals process is appropriate. Public Works staff intends to request funding for this project for Fiscal Year 2026-27.

STAKEHOLDERS/OUTREACH
Public Works Facilities Management staff and the vendor Schneider Electric will coordinate building work with other city departments to avoid disruptions to municipal operations and to the public.

FISCAL IMPACT
The operation and maintenance of the city’s Andover Building Management Systems will cost $165,000 annually, for a total of $825,000 over 5 years. The budgeted amount for the contract in FY 2025-26 is $85,000. The Public Works Department budget intends to absorb the remaining cost and therefore no new appropriation is being requested at this time. The appropriation for the remaining years will be requested as part of the annual budget process. The funding is outlined below:

Existing Appropriation
Amount Account String Funding Source
$150,000 43110-6070-PWD-7508-P0000 Building Maintenance Fund $15,000 43110-2580-PWD-7533-P0000 Transit Utility Fund

ENVIRONMENTAL REVIEW (CEQA/NEPA)
This item includes routine monitoring, maintenance and repair activities and is not subject to CEQA review.

CAMPAIGN DISCLOSURE
The names and business addresses of the members of the board of directors, the chairperson, CEO, COO, CFO, Subcontractors and any person or entity with more than 10% interest in the company proposed for contract in this Agenda Item Report are 157 of 348
9d
25-88699
4 attached in Exhibit 1, in accordance with the City Campaign Finance Ordinance No. 5744

ALTERNATIVES TO STAFF RECOMMENDATION
Alternative 1: The City Council may choose to not approve the resolution and continued support of the Andover building management system will be suspended, which will impair operations of building access and HVAC systems at city facilities. Staff recommends against this alternative.

Alternative 2 The City Council may consider any other alternative not proposed by staff.

ADMINISTRATIVE ACTION
Submitted by:

Daniel Hernandez, Director of Public Works
Prepared by:

Shea Eccleston-Banwer, Public Works Administrator
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Schneider Electric Campaign Finance Form
158 of 348
RESOLUTION NO.

A RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALE,

CALIFORNIA, DISPENSING WITH COMPETITIVE BIDDING AND

AUTHORIZING THE CITY MANAGER OR A DESIGNEE TO EXECUTE A CONTRACT WITH SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC., FOR OPERATION AND MAINTENANCE OF THE CITY’S SCHNEIDER

ELECTRIC BUILDING MANAGEMENT SYSTEMS AND SOFTWARE,

INCLUDING ECOSTRUXURE AND STRUXUREWARE BUILDING
OPERATIONS / ANDOVER CONTINUUM (ANDOVER).

WHEREAS, the Public Works Department is responsible for the maintenance and repair of over 200 City facilities including: parks, Civic Center, police, fire, libraries, and corporation yards; and
WHEREAS, the Andover building management system, a proprietary building management system, has provided digital heating, ventilation and air conditioning (HVAC) services to City of Glendale buildings since 2001 and currently also provides building access control and interior and exterior lighting controls; and WHEREAS, the city’s existing building management systems currently includes Schneider Electric Americas, Inc. (Schneider Electric) building management software and extensive hardware and wiring in all city facilities. The hardware includes wiring, door locking mechanisms, access card readers, locking controllers, temperature sensors, air flow controllers, VAV controllers, AC and heat controllers, water temperature sensors, and HVAC central controllers; and
WHEREAS, implementation of Andover building management systems has increased efficiencies in energy savings, staff time, security and building reliability; and WHEREAS, Andover building management systems in city buildings must be maintained by licensed and specialized contractors and in order to provide continued support of these systems, it is necessary to retain the services of Schneider Electric.

Schneider Electric is the parent company of the Andover product, and they are the only vendor available to support the city’s Andover systems including its software systems; and
WHEREAS, due to the significant capital investment, training, and development in the Andover system over the past 24 years and since the system continues to provide the functionality and performance desired, it is the most economical choice to continue operating and maintaining the Andover system that is currently in-place. The existing commercial grade building management system is proprietary, and staff estimates the capital costs to replace this system is in excess of $2 million; and WHEREAS, transitioning to a new building management system to replace Andover will likely be a long incremental process over several years meaning there will be a need for operational and maintenance services from Schneider Electric for some time; and 159 of 348
WHEREAS, Glendale City Charter, Article VI, Sec. 9 provides an exemption to competitive bidding where the Council determines it is in the best interests of the city to dispense with competitive bidding; and
WHEREAS, given the foregoing finding and facts, it appears adequate justification exists and it is in the best interests of the city, upon recommendation of the Director of Public Works, to dispense with competitive bidding and to authorize the City Manager or a designee to execute a new contract with Schneider Electric for Operation and Maintenance of Andover building management systems for 5 years in an amount not to exceed $825,000.

NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:

1. That the foregoing facts are deemed to be true and correct and are a basis for dispensing with competitive bidding and authorizing the execution of a contract amendment for operation and maintenance of the Andover building management system with Schneider Electric.

2. The Council hereby dispenses with competitive bidding and authorizes the City Manager, or a designee, to execute a new contract for operation and maintenance of the Andover building management system with Schneider Electric for 5 years for a not-to-exceed amount of $825,000, subject to approval as to form by the City Attorney.

Adopted this day of , 2025.

Mayor, City of Glendale
ATTEST:

City Clerk

STATE OF CALIFORNIA )

COUNTY OF LOS ANGELES )

CITY OF GLENDALE )
I, Suzie Abajian, Ph.D., City Clerk of the City of Glendale, certify that the foregoing Resolution No. was Adopted by the Council of the City of Glendale, California, at a regular meeting held on the day of , 2025, the same was adopted by the following vote:
160 of 348
Ayes:

Noes:

Absent:

Abstain:

City Clerk
161 of 348
City of Glendale

DISCLOSURE - CAMPAIGN FINANCE ORDINANCE
The City Council adopted Ordinance No. 5744, “Campaign Finance Ordinance,” which became effective on September 9, 2011, and amended it with Ordinance No. 5768, which became effective on March 15, 2012 (“the Ordinance”). The Ordinance prohibits: (1) A contractor* (including a subcontractor**)― who has a contract with the City of Glendale (“City”), Economic Development Department (“EDD”), or the Housing Authority of the City of Glendale (“HA”) and that contract is subject to approval by the City Council, EDD, or HA― from making a contribution to a City Council member, EDD member, HA member, City Clerk, or City Treasurer; and (2) Council members, EDD members, and HA members from voting on matters concerning a contract with a person who has provided a campaign contribution.The Ordinance applies to a contractor whose contract requires the City Council’s, EDD's, or HA’s approval. A contract with the City, EDD, or HA is known as a “City Contract.” The Ordinance also applies to a subcontractor who has a subcontract through a City Contract. The Ordinance excludes a competitively bid contract awarded to the lowest responsible bidder.To assist members of the City Council, EDD, and HA before they vote on a matter regarding a City Contract, the Ordinance requires City staff to prepare this report which discloses certain information about: the contractor receiving the City Contract, and the subcontractor(s) working under the City Contract.

A contractor must provide the information listed below when: A subcontractor must provide the information listed below when:• The City Contract has a total anticipated or actual value of $50,000 or more; or • The subcontract through a City Contract has a total anticipated or actual value of $25,000 or more; or
• A combination or series of City Contracts have a value of $50,000 or more. • A combination or series of subcontracts, for the same or different projects, have an aggregate value of $25,000 or
more. Information that must be disclosed: ● Name of the person, entity, or organization (i.e., the Contractor or Subcontractor) ● Name of the Chief Executive Officer/President
● Chief Operating Officer
● Chief Financial Officer
● Chairperson● All members of the Board of Directors
● All persons who own more than 10% of the person, entity, or organization● Name of any campaign committee owned or controlled by the person, entity, or organization Please complete the following disclosure form: Contractor(s)*:

Name Address
Full Name Title Business Address City State Zip
Chairperson Chief Executive Officer / PresidentChief Operating Officer Chief Financial Officer Board of Directors More than 10% interest owner * “Contractor” is the person, entity, or organization that is the party, or prospective party, to the contract with the City, EDD, or HA or any member of that person’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Officer, Chief Financial Officer, Chief Operating Officer, any person with an ownership interest of more than ten percent (10%) in that person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.

Exhibit 1
Schneider Electric 1 Boston PL Suite 2700, Boston MA 02108 Jean-Pascal Tricoire 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Amir Paul 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Bryan Stevens 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Joshua Dickinson 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Jeramy Samson 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Boston MA 02108 162 of 348
Rev. 6/7/12 J:\FILES\DOCFILES\ORD\CAMPAIGN CONTRIBUTION\DISCLOSURE FORM – CONTRACTOR – 6-7-12.doc Subcontractor(s)**:

Name Address
Full Name Title Business Address City State Zip
Chairperson Chief Executive Officer / PresidentChief Operating Officer Chief Financial Officer Board of Directors More than 10% interest owner ** “Subcontractor” is the person, entity, or organization that has entered into a contract for the performance of all or a portion of the work undertaken under an agreement with an architect, design professional, engineer, or general or prime contract, usually by a general or prime contractor. Subcontractor includes any member of that person’s, entity’s, or organization’s Board of Directors, its Chairperson, Chief Executive Officer, Chief Financial Officer, Chief Operating Officer, any person with an ownership interest of more than ten percent (10%) in that person, entity, or organization, and any campaign committee that is owned or controlled by that person, entity, or organization. Above please disclose these persons’ name and business address.

Campaign Committee owned or controlled by:

Title Business Address City State Zip

CERTIFICATION
On behalf of the above-named Contractor Subcontractor:
• I acknowledge that I have a continuing obligation to update this disclosure form if I substitute― or if I select additional― architects, design professionals, contractors, or subcontractors within ten (10) days of the selection or change; and • I hereby certify that:
ƒ I have identified all persons for which the Ordinance requires disclosure; ƒ The information in this disclosure form (and any attachment to this form) is true, accurate, correct, and complete; andƒ I have been legally authorized to submit this disclosure form.

In total, this disclosure form (including attachments) is pages.

Executed on: , 20 , at: , California.

Signature: Print Full Name:

Address: Phone Number: E-mail Address:

Schneider Electric 1 Boston PL Suite 2700, Boston MA 02108 Jean-Pascal Tricoire 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Amir Paul 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Bryan Stevens 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Joshua Dickinson 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 Jeramy Samson 1 Boston PL Suite 2700, Boston MA 02108 Boston MA 02108 2 August 27 25 Costa Mesa Luis C Soto 1660 Scenic Avenue, Costa Mesa, CA 92626 877-822-2601 163 of 348
[email protected]
1 10a

CITY OF GLENDALE, CALIFORNIA

REPORT TO THE CITY COUNCIL

AGENDA ITEM
Report: Appeal of Design Review Board’s approval of DRB Case No. PDR-004219-2024 located at 906 Whitehaven Terrace to add an 1,865 square-foot (SF) two-story addition and change the architectural style of the existing 1,938 SF single-story single-family residence with an attached 3-car garage constructed in 1973 on a 11,770 SF interior lot in the R1R-III (Restricted Residential Zone, Floor Area District III).

1. Motion to Sustain Design Review Board’s Decision to Approve the Project with Conditions of Approval

2. Motion to Continue the Matter, Directing the City Attorney to Draft Findings Reversing the Design Review Board’s Decision and Denying the Project.

COUNCIL ACTION

EXECUTIVE SUMMARY
This hearing is an appeal of a decision made by the Design Review Board (DRB) on February 13, 2025, to approve the Design Review Case with conditions for the project located at 906 Whitehaven Terrace. The DRB approved the project with five conditions for an 1,865 square foot (SF) two-story addition to the existing 1,938 SF, one-story single-family house and extension of the rear deck (“Project”).

The DRB’s decision was made in accordance with Glendale Municipal Code (GMC) Design Review, of which the purpose is to promote high-quality development that enhances the beauty, livability, and prosperity of the community while preventing poor design that could negatively impact surrounding properties. The Design Review chapter encourages originality and diversity in architectural styles and ensures that new construction and renovations are compatible with existing neighborhood character.

The appellant (subject property’s neighbor) is requesting that the City Council reverse the DRB’s decision approving the Project and for them to return the project to the DRB for redesign. The appellant contends that in rendering its decision to approve the Project with conditions, the DRB violated specific provisions of law and exceeded its authority by virtue of any of the provisions of law. The appellant also claims that staff and DRB failed to fulfill its mandatory duty and that the evidence before the board was insufficient or inadequate to support its decision. The appellant further claims to have new evidence of material facts not previously presented, which if considered should change the decision.

Item Type: Public Hearing
Approved for September 9, 2025 Calendar
164 of 348
2 10a

RECOMMENDATION
That the City Council sustain the DRB’s decision to approve the Project with conditions of Design Review Case No. PDR-004219-2024 with the original DRB-imposed conditions based on all of the evidence, reasoning and findings that the DRB articulated at the February 13, 2025, hearing and set forth in the DRB’s Record of Decision for the project, dated February 13, 2025 and included as Exhibit 4.

BACKGROUND
This hearing is an appeal of a decision made by the DRB on February 13, 2025, to approve the Design Review Board Case No. PDR-004219-2024 with conditions to add a new two-story 1,865 square-foot (SF) two-story addition and change the architectural style of the existing 1,938 SF single-story single-family residence with an attached 3-car garage constructed in 1973 on a 11,770 SF interior lot in the R1R-III (Restricted Residential Zone, Floor Area District III).

GENERAL INFORMATION
Appellants: Argineh D. Galstyan
900 Whitehaven Terrace
Glendale, CA 91207
Michael Michaelian
849 Moorside Drive
Glendale, CA 91207
Status of Appellants: Neighboring property owners
Project Applicant: Harry Akopian
Ecumena Design Studio (Project Architect)
635 West Colorado Street
Glendale, CA 91204
Property Owner: Michael Mazmanian
906 Whitehaven Terrace
Glendale, CA 91207
Requested Action: The appellant is requesting that the City Council reverse the DRB’s Decision to approve Design Review Case No. PDR-004219-2024 by having the project returned to the DRB for redesign.

Legal Description: Lot 48, Tract Number 21941
165 of 348
3 10a
APN: 5649-006-014
Zone: R1R (Restricted Residential), Floor Area Ratio District III Land Use Element: Low Density Residential
Circulation: Whitehaven Terrace is classified as a local street in the City’s Circulation Element of the General Plan.

Lot Size and Frontage: The Project site is approximately 11,770 SF and has a frontage of approximately 90 feet and 6 inches along Whitehaven Terrace.

Surrounding Land Use/Zoning: The subject property is surrounded by single-family residences in the R1R (Restricted Residential) Zone, Floor Area Ratio District III.

Properties within 300 linear feet of the site have average lot size of 14,427 SF.

Utilities and Public Services: All municipal and private utilities are in place serving the neighborhood and other public services are currently provided in the vicinity.

Site Description: The Project site is an 11,770 SF interior lot with frontage on Whitehaven Terrace. The site was previously graded with initial development of the site. It is predominantly flat adjacent to the street, but slopes down in the southern one-third of the property. The site was originally developed in 1973 with a 1,938 SF one-story single-family residence with an attached 3-car garage. The project site is accessed via an existing driveway from Whitehaven Terrace which will be maintained.

RELEVANT PROJECT HISTORY
December 6, 2024 – Design Review Case No. PDR-004219-2024 was submitted by the Project applicant, Harry Akopian, for the proposed 2-story addition.

February 13, 2025 –Design Review Case No. PDR-004219-2024 was presented to the DRB with a staff recommendation to approve the Project with conditions. The DRB voted unanimously (3-0) to approve the Project with five conditions (Exhibit 4):

1. Restudy the design to reduce the massing and scale of the second-story volume, ensuring it followings the topography and eliminates the cantilevered portion of the addition, while extending the volume towards the street front.

2. Remove the second-story balcony.

3. Plant live vegetation of appropriate height along the rear and side of the property for privacy screening.

4. Modify the design of the second-story volume to create better proportions and reduce the prominence of the entryway.

5. Simplify the roof design by reducing the variation of roof forms to achieve a more 166 of 348 4 10a
proportional look in harmony with the overall home.

February 26, 2025 – The appellant submitted their appeal of the DRB’s approval – Case No. PAPP-004609-2025 (Exhibit 9).

SUMMARY OF DRB’S DISCUSSION OF CASE NO. PDR-004219-2024 Generally, the DRB was in favor of the Project and the discussion of the Project was limited.
• Three DRB members, Lockareff, Kaskanian, and Welch, were present at the February 13, 2025, meeting at which the Project was discussed. Board member Simonian was absent.
• Board member Welch stated that while adding a second story is a property right, the DRB's role is to ensure thoughtful design that respects neighboring properties and complies with the City’s Design Guidelines. He shared public concerns about massing and felt the addition did not follow the site’s topography. While he did not view the main entry as overly monumental, he found the roof forms overly complex.

His main concern was the cantilevered rear portion of the second story, which he believed conflicted with the Design Guidelines and could negatively impact downhill neighbors. He recommended redesigning this element and questioned the need for the second-story balcony due to privacy concerns. He considered the first-story deck extension to be a minor change.

Mr. Welch also felt the overall scale was too large, with an FAR above the neighborhood average, and suggested reducing the size of the master bedroom and bathroom. Noting the area’s varied architecture, he did not believe a specific style could be imposed.
• Board member Lockareff agreed with the comments made by Board member Welch. She did not oppose the second-story addition but emphasized the need for conditions to remove the balcony, reduce the overall massing, and shift the structure towards the street to mitigate privacy impacts. She found the rooflines to be overly complex and recommended simplifying them in conjunction with the reduced massing to better follow the topography. Additionally, Ms. Lockareff felt that the entry was too monumental.
• Chair Kaskanian expressed his support for the second-story addition, noting that there is nothing in the Design Guidelines that prohibits new two-story additions.

He agreed with the proposed conditions to reduce the height and simplify the rooflines, and he also felt that the front entry was too monumental and needed to be reworked. Furthermore, Chair Kaskanian suggested adding a condition to require the planting of privacy hedges to mitigate privacy concerns. • Board member Welch questioned whether the project should be approved with 167 of 348 5 10a
conditions or returned for redesign. Board member Lockareff stated she was comfortable approving the project with conditions.
• Staff received four letters from the public prior to the hearing and seven members of the public spoke at the hearing in opposition to the Project, including both appellants. Two people spoke in favor. Concerns from the public were in regard to the privacy impacts, incompatibility of the massing and architecture. A copy of the comment letters is attached as Exhibit 8.
• Following review of the staff report and attachments, including the submitted correspondence, and having heard all testimony at the public hearing, Board member Lockareff made a motion to approve the Project with conditions. The motion was seconded by Board member Welch. The Record of Decision is attached as Exhibit 4.
• The applicant has incorporated most of the required modifications in the draft revision of the proposed plans (Exhibit 11), including the removal of the secondstory balcony, reduction in overall massing and scale, simplification of rooflines, refinement of the monumental entry, and enhancement of privacy screening with additional landscaping along the property boundary. The plans do not address the conditions for the removal of the cantilevered portion and the relocation of the second-story volume toward the street front.

SUMMARY OF THE APPELLANT’S BASIS FOR APPEAL AND STAFF RESPONSES In the appeal application, the appellants state that the conditions of approval imposed by the DRB violated specific provisions of law and exceeded its authority; and that staff and DRB failed to fulfill their mandatory duty. Furthermore, the appellants believe that the evidence before the DRB was insufficient or inadequate to support its decision. The appellants have new evidence not previously presented, which if considered should change the approval decision. Below is a summary of the statements made by the appellants in their appeal application (Exhibit 9), as well as staff’s responses to the statement.

Part 4A (DRB Violated Specific Provisions of Law):

The appellants contend that the DRB violated a specific provision of law because the Project fails to comply with multiple Glendale Municipal Code (GMC) standards, particularly those outlined in GMC 30.47.040 (Design Review Standards) Sections (B)(3) (relationships to adjacent buildings), & (D) (compatibility with surrounding neighborhood character), and GMC 30.11.040(D) (Density).

The appellants state that the Project does not follow the natural slope of the street. The existing one-story homes were designed to step down with the topography to minimize their impact on neighboring properties. The appellant claims the Project will intrude on their privacy, as the balcony and large windows will overlook their dining room, kitchen, and backyard, affecting the use of their property and leading to loss of natural light.

Additionally, the appellants assert that the scale of the Project, with a floor-area-ratio (FAR) of 32.3%, is disproportionate to the lot size and out of character with the 168 of 348 6 10a
predominantly one-story homes in the neighborhood. The modern farmhouse design is also seen as incompatible with the surrounding homes.

The appellants further object to the inclusion of properties 1066 Old Phillips and 1060 Old Phillips in the neighborhood survey, as they are not within the required 300 linear feet of the Project. The appellant believes their inclusion distorted the analysis of the project’s FAR and misrepresented the neighborhood characteristics. Based on these concerns, the appellant argues that the DRB’s approval of the Project overlooked key aspects of the design standards.

Staff Response:

Related to the appellant’s privacy concerns, GMC Section 30.47.040(B)(3) requires that new two-story developments in single-family zones provide reasonable access to natural light and not unreasonably impact the privacy of adjacent buildings and outdoor spaces.

Privacy is evaluated based on views from “public rooms” such as dining rooms and living rooms, as well as balconies over 25 square feet. In response to the appellant’s privacy concerns, the DRB conditioned the Project to remove the second-story balcony, which had the greatest potential for overlooking adjacent properties. Additionally, the DRB required the installation of vegetation along the rear and side property lines to provide screening. Although the Project’s first floor “public rooms” face 900 Whitehaven Terrace, the proposed home is situated approximately seven feet below its neighbor and is set back approximately 14 feet from the common property line. These site characteristics mitigate potential privacy intrusions and ensure access to natural light. The proposed second-story only includes bedrooms and bathrooms, which are not classified as “public rooms” under the code and, therefore, do not raise privacy concerns.

Second, regarding the appellant’s concern that the Project fails to follow the natural topography of the street, GMC Section 30.47.040(D) requires that new development maintain compatibility with the character of the surrounding neighborhood and consider topographic conditions. In response, the DRB conditioned the Project to remove the cantilevered rear portion of the second story, reduce the massing and scale of the upper level, and restudy the second-story volume to be closer to the front of the residence as opposed to the rear. These changes are intended to help the design better follow the natural slope of the site, ensuring a smoother transition with the neighboring homes that step down with the terrain.

Third, as the Project pertains to the scale and size of the house, the appellants argue that the Project’s floor-area-ratio (FAR) of 32.3% is excessive and inconsistent with the surrounding one-story neighborhood. GMC Section 30.47.040(D) requires that new single-family homes be compatible with the neighborhood in terms of massing, scale, height, and other design factors. While the proposed FAR is higher than the neighborhood average, the DRB imposed conditions to reduce the overall scale and bulk of the house. These included simplifying roof forms, eliminating a monumental front entry feature, and restudying the second story. These revisions help align the Project more closely with the eclectic but generally lower-scale character of the area. Neither the GMC nor the City’s Design Guidelines prohibit two-story homes in this neighborhood; rather, projects must comply with applicable development and design standards, which this Project does, as conditioned. 169 of 348
7 10a
With respect to the neighborhood survey, the appellant correctly notes that two properties—1066 Old Phillips and 1060 Old Phillips—were mistakenly included in the applicant’s neighborhood analysis, even though they fall outside the 300 linear feet radius required by GMC Section 30.47.040(D). This error occurred due to a mapping error that did not properly account for the slope. However, excluding these two properties only slightly reduces the average neighborhood FAR from 0.18 to 0.17 and does not materially affect the DRB’s analysis or findings. Moreover, there are still three two-story properties within the accurate 300-foot survey radius, which supports the conclusion that the proposed two-story design is not inconsistent with the character of the area.

Finally, in response to the appellant’s claim that the Project violates GMC Section

30.11.040(D) regarding density, staff notes that this section governs density for residential subdivisions and applies only when a property is being subdivided. The Project does not propose any subdivision and, therefore, this section is not applicable.

The Project is subject instead to development standards for the R1R zone, which include limits on floor-area, height, setbacks, and lot coverage, all of which are met or conditioned to comply through DRB review.

Part 4B (DRB exceeded its authority by virtue of any of the provisions of the law) The appellant contends that the DRB exceeded its authority by approving the Project with substantial conditions imposed on the design. These conditions included reducing the second-story volume, ensuring the design followed the topography, eliminating cantilevered portion of the addition, and simplifying the roof form. The appellant believes that given the many concerns raised by neighbors, the DRB should have returned the project for redesign. Additionally, the appellant believes that the DRB failed to give sufficient attention to the relationship between the placement of windows in the new development and adjacent properties. They assert that incorrect information was presented to the DRB regarding line of sight from the new design, which impacts the privacy of neighboring properties. Furthermore, the appellants claim that the conditions placed on privacy protection, such as planting vegetation, as vague and lacking enforcement measures to ensure they would effectively maintain privacy.

Staff Response:

Regarding the authority of the DRB to impose conditions rather than require redesign, GMC 30.47.030(J) outlines the purpose and authority of the DRB, which includes ensuring that buildings and structures are designed and located in a manner that satisfies the intent of design review and meets established standards. The DRB is authorized to impose conditions related to site planning, design, and appearance, and may require changes to ensure compatibility with surrounding development.

Pursuant to GMC 30.47.075(D), the DRB has the discretion to determine whether a project should be returned for redesign, approved with conditions, or approved without conditions. During the February 13, 2025 hearing, the DRB discussed the possibility of returning the Project for redesign but ultimately concluded during deliberations that the conditions imposed on the approval were sufficient to bring the Project into compliance with the City’s Design Guidelines. Therefore, the DRB did not exceed its authority by approving the Project with conditions. The conditions imposed—including reducing the 170 of 348 8 10a
scale and massing, eliminating the cantilevered portion, pushing the second floor toward the front of the house, simplifying the roof forms, and requiring privacy landscaping—are within the scope of DRB authority and were aimed at ensuring compatibility with surrounding development and mitigating privacy impacts.

Secondly, in response to the appellant’s claim that the DRB failed to adequately consider the relationship between window placement and adjacent properties, the DRB specifically addressed these issues through the imposition of conditions. As discussed in the previous response, the second story includes only bedrooms and bathrooms. These rooms are not considered “public rooms” under GMC 30.47.040(B)(3). The first-story windows that face the neighboring residence are located at a lower elevation are set back 14 feet from the property line. In addition, the DRB required the installation of landscaping along the side and rear property lines to provide privacy screening.

Landscape installation will be checked at the DRB final inspection to determine compliance with the approved plans. These combined measures mitigate potential privacy concerns related to window placement.

Third, in regard to the appellant’s claim that incorrect information was presented to the DRB regarding line of sight, staff reviewed the plan site section submitted by the applicant (Sheet A101 of Exhibit 3), which illustrates the line of sight from the proposed second-story balcony. The appellant’s submission—a photo with a hand-drawn line— was not to scale or professionally verified. With the DRB’s conditions to eliminate the balcony and remove the cantilevered portion, the second story will be further set back, further reducing potential line of sight impacts.

Lastly, regarding the appellant’s claim that the condition requiring privacy landscaping is vague or unenforceable, the DRB required the use of vegetation of appropriate height and density along the side and rear property lines specifically to address privacy screening. Compliance with these conditions will be confirmed at the time of plan check and during the final DRB inspection. Any failure to implement or maintain the required landscaping would be a violation of the conditions of approval and subject to enforcement by the City. Further, per GMC 30.47.050, the landscaping must be maintained for a period of five years.

Part 4C (DRB failed to fulfill a mandatory duty)
The appellants contend that staff and the DRB failed to fulfill a mandatory duty when it did not inform them that a final decision had been rendered and that an appeal could be filed within 15 days. They claim that after the hearing adjourned, City staff and DRB members did not convey this information, leading them to believe the project would be redesigned and returned to the DRB, with an opportunity for the public to review. After the hearing and before the appellant received the Record of Decision, the appellants inquired about how they could be kept informed about the Project revisions to address the DRB’s comment. They were then informed by staff that the decision was final and the only recourse was an appeal.

The appellants also assert that despite multiple contact with staff, they were unable to obtain the Design Review Board Record of Decision until seven days after the hearing.

This delay, they argue, undermined their confidence in the procedural process and in 171 of 348 9 10a
staff's ability to follow guidelines.

Additionally, the appellants claim they had insufficient time to review the project and present their concerns. The appellants claim to have received notification about the Project six days before the DRB meeting, and due to their work schedule, they were unable to fully review the plans or attend the meeting together. The appellants also state their concerns about privacy and inaccuracies in the staff report were not adequately addressed. Specifically, that the staff report incorrectly marked “Yes” under the “Privacy” section, even though the Project would directly affect their privacy. The appellants also pointed out that the staff report failed to discuss two important issues: "consideration of views from public rooms and balconies/decks" and "avoiding windows facing adjacent windows," both of which applied to their situation.

Staff Response:

First, as it relates to the noticing and appeal process, Glendale Municipal Code (GMC) Chapter 30.61 requires that public notices be mailed and posted at least ten (10) calendar days prior to the scheduled hearing date. In compliance with this requirement, the public noticing for the Project was mailed and posted on the City’s website on January 31, 2025—thirteen (13) days prior to the scheduled February 13, 2025 Design Review Board (DRB) meeting—to property owners and occupants within a 500-foot radius of the Project site. Staff also verified that the required physical noticing was installed at the Project site at least ten (10) calendar days prior to the hearing date.

Additionally, the temporary framing poles outlining the project scope were installed on January 15, 2025, which was confirmed by staff to meet the City’s noticing requirements.

Mailed public notices included information on how to file an appeal, and staff provided instructions on the appeal process at the beginning of the DRB hearing, which the appellants attended. During the hearing, the public was given additional time to speak, and the DRB deliberated on whether the Project should come back to them for redesign or be approved with conditions. After deliberation, the Board unanimously voted to approve the project with conditions. Therefore, the Board made it clear that the project would not be returned for redesign. Both appellants were present until the end of the meeting.

Regarding the tardy availability and the Record of Decision (ROD), staff acknowledges an error in not sending out this document to those who spoke at the public meeting or who submitted written comments. However, the appellants had access to the video recording of the hearing, as mentioned in their appeal, and this did not prevent them from filing a timely appeal. The ROD was posted online on February 14, 2025, the day after the hearing, and staff responded to all inquiries about the project from the appellants via email, including information about the appeal, on February 14, 2025 (Exhibit 8). While the appellants’ concerns regarding communication delays are noted, the appeal process was not compromised, and staff asserts that the DRB properly followed procedures and provided opportunities for public input.

In response to the appellants’ claim that they had insufficient time to review the Project and present their concerns, staff notes that the required 10-day public notice was met, and documents were available online during that period. The DRB also allowed for an 172 of 348 10 10a
additional 2-minutes for the appellants to speak during their 3-minute public comment portion of the hearing. Staff believes the public had sufficient time and opportunity to participate, and the noticing process was conducted in accordance with all applicable GMC requirements.

Finally, regarding the staff report and privacy impacts, staff reviewed privacy impacts as required by GMC 30.47.040(B)(3), which specifies that privacy is judged from “public rooms” such as living rooms, dining rooms, and family rooms, and from balconies larger than 25 square feet. Staff did not find that the second-story windows would impact the privacy of adjacent properties given the intervening topography and distance between the subject site and the abutting properties. Additionally, the proposed second story includes only bedrooms and bathrooms, which are not considered “public rooms” under the code. Conditions of approval, which include the removal of the balcony, a further setback of the second story at the rear, and the installation of privacy landscaping along the borders of the subject property, directly address and mitigate any remaining privacy concerns.

Part 4E (The evidence before the DRB was insufficient or inadequate to support its action)
The appellant contends that the evidence before the DRB was inaccurate and inadequate to supports its decision to approve the project with conditions. The appellant claims that the applicant submitted false information concerning the neighborhood survey. They assert that two properties, 1066 Old Phillips and 1060 Old Phillips, should not have been included in the survey list as they are not within the required 300-foot lineal feet of the project site, as confirmed by Glendale Public Works, Engineering. The appellant contends that the inclusion of these properties skewed the statistical analysis of the FAR to make the Project appear more consistent with surrounding properties.

Despite raising this issue with staff, the information was not updated before the DRB hearing and inaccurate information was presented to the Board. The appellant further emphasizes that the architect provided inaccurate 3D renderings, which omitted details such as the outdoor shower located on the west elevation of the house facing the appellant’s property. This omission, according to the applicant, concealed the design’s impact on privacy.

Additionally, the appellant asserts that the DRB did not adequately address the privacy impacts of the Project. The conditions of approval provided by the Board to mitigate these impacts were vague and insufficient. Planting vegetation was deemed by the appellant to be unclear and lacking enforceable measures to ensure the vegetation will provide meaningful privacy protection. Moreover, according to the appellant, the instructions to “consider” reducing the mass of the upstairs portion of the addition or shifting it toward the street were similarly imprecise and did not adequately address the privacy concerns raised. As a result, the appellant believes the DRB was unable to properly assess and adjust the design to minimize privacy violations, ultimately leading to an approval that does not sufficiently protect the surrounding neighbors’ privacy.

Staff Response:

As discussed above, staff acknowledges that the properties located at 1066 Old Phillips and 1060 Old Phillips were mistakenly included in the neighborhood survey. Despite this 173 of 348 11 10a
error, staff maintains that the exclusion of these two properties does not significantly impact the neighborhood average FAR, reducing it from 0.18 to 0.17 (Exhibit 6). The appellant submitted written comments via email (Exhibit 8) regarding their concerns about the potential impacts to privacy, the massing and scale, and design of the Project on February 12, 2025, and these comments were forwarded to the DRB the same day.

Additionally, staff provided copies of written comments to the DRB at the hearing, and the appellant also presented this information during the public comment portion of the hearing.

The appellants are correct that the outdoor shower was not identified in the 3D renderings, elevations, and site plan of the Project, but it was shown on the landscape plans. However, the location of the outdoor shower does not affect privacy impacts because it is located outside of the setback and screened from the public view by a six foot tall fence and gate.

The DRB’s approval included conditions to eliminate the second-story balcony, reduce the mass and scale of the second-story addition by relocating this square footage toward Whitehaven Terrace, and planting vegetation for privacy screening along the rear and side property lines. These conditions, in part, were incorporated into project approval to address privacy concerns. Prior to plan check, staff will evaluate revised plans to ensure that all conditions have been addressed. This review will include revised landscape plans to ensure that the plants proposed will provide for privacy screening. Once plans are approved, the landscaping must be installed pursuant to those plans and maintained for a minimum of five years per GMC 30.47.050. Additionally, reducing the mass of the second floor and moving it closer to the street were conditions, not “considerations” as the appellant claims and revised plans must demonstrate compliance with all conditions in order for staff to approve them. As such, the conditions imposed by the DRB adequately address the concerns raised by the appellant.

Part 4F (The appellant has new evidence of material facts not previously presented, which if considered should change the act, determination, or ruling) The appellant asserts new facts, which were not previously presented, and if considered, should change the approval decision. These facts include the statements provided for the reasons of appeal and insufficient speaking time. They also included letters that were sent via email to staff on February 12, 2025, which include map verification showing the properties, 1060 Old Phillips and 1066 Old Phillips, located outside the 300-feet radius from the Project property, photos showing the project site from different areas from the appellant properties, and the appellant’s version of line of sight drawing.

Staff Response:

The facts presented by the appellant were not new as these materials were submitted to staff as public comment and provided to the DRB prior to the hearing (Exhibit 8).

Furthermore, the DRB allowed each public speaker an additional 2 minutes to the allocated 3-minute time limit to express their concerns during the public comment section of the meeting.

The line-of-sight drawing that the appellants provided consists of a photo with a drawn-in sight line between the Project framing poles and the appellant’s property. This image 174 of 348 12 10a
was not professionally verified as opposed to the line-of-sight drawing provided by the Project architect.

SUMMARY
Based on the analysis of the appeal and the reasoning above, staff recommends that the City Council sustain the DRB’s decision to approve the Project with the original DRBimposed conditions. The Board members considered not only the site planning, but also the Project’s massing, scale, height, setback, landscaping, window placement, use of materials and colors and other architectural design elements and privacy in determining compatibility and consistency with the City’s Design Guidelines.

The basis of the DRB’s decision (the Record of Decision, Exhibit 4) includes the following:

Determination of Compatibility: Site Planning
The proposed site planning is appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The condition to eliminate the cantilevered design and push the second-story volume towards the street will take the site’s topography into consideration by restricting the addition to follow the topography.
• Mechanical equipment and trash enclosure areas are screened behind the fence and gate on the eastern side yard of the residence.
• The new retaining walls feature landscaping to minimize the visual impact of the retaining walls.
• The project plan extends the existing deck towards the rear, bringing it more in line with the neighboring deck.
• The existing driveway is replaced with a new decorative permeable paving in the same footprint and slope.

Determination of Compatibility: Mass and Scale
The proposed massing and scale are appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The neighborhood consists of both one- and two-story residences. The immediate west adjacent neighbor’s two-story residence is compatible with the proposed twostory addition. • The proposed design change, from the existing Ranch style to contemporary farmhouse design, features variations of roof forms and breaks in the facade to minimize the visual impact from the street.
175 of 348
13 10a
• The condition to reduce the massing and scale of the second-story volume, eliminate the second-story balcony, and cantilever the design creates a proportional massing that visually fits into the surrounding context. • The condition to redesign the roof plan to reduce the variations creates a proportional roof form for the structure.

Determination of Compatibility: Design and Detailing
The proposed design and detailing are appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The project incorporates design details that are complementary to the contemporary farmhouse style of the single-family dwelling, such as limestone veneer, board-andbatten siding, and smooth stucco finish throughout the house. • The project proposes to utilize high-quality materials that reinforces the design of the home such as the aluminum-clad wood windows, multi-width slate tile roof, stainless steel chimney cap, wooden door, ornamental wooden moldings, trims, corbels, and fascia, and lantern sconces.
• The new driveway features cobblestone paving and concrete paving with turf and limestone paving for the walkway to enhance the curb appeal of the property. • The condition to eliminate the second-story balcony and planting of live plant materials along the rear and side property helps to mitigate privacy impacts to the adjacent properties.
• The condition to redesign the entry eliminates the monumental entry design.

STAKEHOLDERS/OUTREACH
The Code requires public notice when the Council considers approval of entitlements such as design review. Staff has published all required notices and has mailed copies of the notice to all property owners and occupants within 500 feet of the project. A public notice has also been posted on-site.

FISCAL IMPACT
There is no fiscal impact associated with this report.

ENVIRONMENTAL REVIEW (CEQA/NEPA)
The project is exempt from CEQA review as a Class 3 “New Construction or Conversion of Small Structures” exemption pursuant to Section 15303 of the State CEQA Guidelines because the project is the construction of a new single-family house. The property does not appear eligible for historic designation at the federal, state or local levels and is, therefore, not considered a historic resource under the California Environmental Quality Act.
176 of 348
14 10a

CAMPAIGN DISCLOSURE
The names and business addresses of the members of the board of directors, the chairperson, CEO, COO, CFO, Subcontractors and any person or entity with more than 10% interest in the company proposed for contract in this Agenda Item Report are attached in Exhibit 10, in accordance with the City Campaign Finance Ordinance No. 5744.

ALTERNATIVE TO STAFF RECOMMENDATION
Continue the Appeal and direct the City Attorney to return with draft findings reversing the DRB’s decision and denying the Project. If the Council wishes to reverse the Design Review Board’s decision, a second alternate motion is included to continue the matter for three weeks, without further public notice, and direct the City Attorney to prepare written findings in support of denying the Project.

ADMINISTRATIVE ACTION
Submitted by:

Bradley Calvert, Director of Community Development
Prepared by:

Eric Ji, Planning Associate
Approved by:

Roubik R. Golanian, P.E., City Manager

EXHIBITS/ATTACHMENTS
Exhibit 1: Location Map
Exhibit 2: Photos of Existing Property
Exhibit 3: DRB Staff Report and Reduced Plans for Current Design Review Application (PDR-004219-2024) from February 13, 2025
Exhibit 4: DRB Record of Decision for Current Design Review Application (PDR-004219- 2024) from February 13, 2025
Exhibit 5: Neighborhood Survey
Exhibit 6: Revised Neighborhood Survey
Exhibit 7: Interdepartmental Comments
Exhibit 8: Correspondence
Exhibit 9: Notice of Appeal of DRB’s Decision to City Council and supplemental documents.

Exhibit 10: Campaign Disclosure
Exhibit 11: Draft Revised Plan
177 of 348
MOTION
Moved by Council Member _____________________________, seconded by Council Member _________________________, that upon review and consideration of all documents, materials, exhibits and testimony relative to the appeal of the Design Review Board approval with conditions of Design Review Case No. PDR-004219-2024, located at 906 Whitehaven Terrace (the “Design Review Case”), and after having conducted a public hearing on the appeal on September 9, 2025, pursuant to the Glendale Municipal Code, 1995 (“GMC”), and receiving testimony, the City Council of the City of Glendale, California, based upon all of the evidence in the record, hereby SUSTAINS the Design Review Board’s decision to APPROVE WITH CONDITIONS OF APPROVAL the Design Review Case based on the findings and conclusions set forth in the September 9, 2025, report to Council from the Director of Community Development, including any attachments thereto. Further, the Council hereby adopts, and incorporates herein by this reference, the analysis, findings, conclusions and conditions of the Design Review Board in its Record of Decision dated February 13, 2025 (Exhibit 4 to the Report).

FINDINGS
In approving the Design Review Case, the Council hereby makes the following findings:

Site Planning: The proposed site planning is appropriate, as modified by any conditions, to the site and its surroundings for the following reasons:
• The condition to eliminate the cantilevered design and push the second-story volume towards the street will take the site’s topography into consideration by restricting the addition to follow the topography. 178 of 348 2 • Mechanical equipment and trash enclosure areas are screened behind the fence and gate on the eastern side yard of the residence.
• The new retaining walls feature landscaping to minimize the visual impact of the retaining walls.
• The project plan extends the existing deck towards the rear, bringing it more in line with the neighboring deck.
• The existing driveway is replaced with a new decorative permeable paving in the same footprint and slope.

Mass and Scale: The proposed mass and scale are appropriate, as modified by any conditions, to the site and its surroundings for the following reasons:
• The neighborhood consists of both one- and two-story residences. The immediate west adjacent neighbor’s two-story residence is compatible with the proposed two-story addition.
• The proposed design change, from the existing Ranch style to contemporary farmhouse design, features variations of roof forms and breaks in the facade to minimize the visual impact from the street.
• The condition to reduce the massing and scale of the second-story volume, eliminate the second-story balcony, and cantilever the design creates a proportional massing that visually fits into the surrounding context. • The condition to redesign the roof plan to reduce the variations creates a proportional roof form for the structure.

Building Design and Detailing: The proposed building design and detailing are appropriate, as modified by any conditions, to the site and its surroundings for the following reasons:
• The project incorporates design details that are complementary to the contemporary farmhouse style of the single-family dwelling, such as limestone veneer, board-and-batten siding, and smooth stucco finish throughout the house. • The project proposes to utilize high-quality materials that reinforces the design of the home such as the aluminum-clad wood windows, multi-width slate tile roof, stainless steel chimney cap, wooden door, ornamental wooden moldings, trims, corbels, and fascia, and lantern sconces.
• The new driveway features cobblestone paving and concrete paving with turf and limestone paving for the walkway to enhance the curb appeal of the property. 179 of 348
3 • The condition to eliminate the second-story balcony and planting of live plant materials along the rear and side property helps to mitigate privacy impacts to the adjacent properties.
• The condition to redesign the entry eliminates the monumental entry design.

CONDITIONS OF APPROVAL

1. Restudy the design to reduce the massing and scale of the second-story volume, ensuring it followings the topography and eliminates the cantilevered portion of the addition, while extending the volume towards the street front.

2. Remove the second-story balcony.

3. Plant live vegetation of appropriate height along the rear and side of the property for privacy screening.

4. Modify the design of the second-story volume to create better proportions and reduce the prominence of the entryway.

5. Simplify the roof design by reducing the variation of roof forms to achieve a more proportional look in harmony with the overall home.

6. Harry Akopian, Ecumena Design Studio, and Michael Mazmanian (Applicant/Owner), and their respective successors; owners by deed, deed-in-lieu of foreclosure, foreclosure or otherwise; assigns; and/or any real party in interest with an interest in the property that is the subject of this approval, and/or with an interest in the Project site, that is named as a party in any suit (hereinafter collectively the “Developer”), agree to and shall defend, indemnify, and hold harmless the City of Glendale (the “City”), and each of its agents, officers, council members, commissioners, attorneys, employees and representatives (the “Indemnitees”) from any claim, action or proceeding brought against the City and/or the Indemnities to attack, set aside, void or annul any City land use or California Environmental Quality Act approval for the Project. The Developer agrees to use legal counsel reasonably acceptable to the City. The foregoing shall include, without limitation, payment of all damages awarded against the City and/or the Indemnitees, if any, costs of suit, attorney’s fees, and other costs and expenses incurred in connection with such action or proceeding. In the event that a claim, action or proceeding referenced herein is brought, the City shall promptly notify the Developer of the existence of the claim, action or proceeding and will cooperate fully in the defense of such claim, action or proceeding. As used herein, “land use approval” shall refer to decisions of the City approving requests of applicants for planning permits, including, but not limited to, general plan amendments, annexations, zone changes, zoning ordinance text amendments, tentative maps, vesting tentative maps, tentative parcel maps, reversions to acreage, final maps, final modifications or amendments, time extensions, parcel map waivers, lot line adjustments, boundary line adjustments, certificates of compliance, conditional certificates of compliance, design review approvals, development agreements, conditional use permits, conditional use permit modifications, conditional use permit extensions, variances, variance modifications, precise plan of design, specific plans, density bonus review/housing plan applications, sign permits, parking reduction permits, site 180 of 348 4 plans, temporary use permits, any administrative or discretionary permit pertaining to a land use approval, and/or any accompanying California Environmental Quality Act determination(s) pertaining to the type of approval referred to in this section, and any other similar approval.

Vote as follows:

Ayes:

Noes:

Absent:

Abstain:
181 of 348
MOTION
Moved by Council Member _____________________________, seconded by Council Member _________________________, that upon review and consideration of all documents, materials, exhibits and testimony relative to the appeal of the Design Review Board approval with conditions of Design Review Case No. PDR-004219-2024, located at 906 Whitehaven Terrace ( “Design Review Case”), and after having conducted a public hearing on said appeal pursuant to the Glendale Municipal Code, 1995, and receiving testimony, the City Council, based upon all of the evidence in the record, hereby REVERSES the Design Review Board’s decision and DENIES the Design Review Case. The City Council hereby continues this matter for three weeks until the September 30, 2025 City Council meeting, without further public notice, and directs the City Attorney to prepare written findings in support of denying the Design Review Case.

Vote as follows:

Ayes:

Noes:

Absent:

Abstain:
182 of 348
EXHIBIT 1
183 of 348
N80°14'49"E 117.52' N09°24'59"W 136.13'
N09°25'47"E 114.86'
(1096')
(1112')
(1110')
(1108')
(1110')
(1112')
(1108')
(1114')
(1094')
(E) WALKWAY
(E) LANDSCAPE
(E) CONC. SLAB
(E) DRIVEWAY APRON
(E) NON-PROTECTED TREE
(E) STONE WALL
(E) LANDSCAPE

ROOFED PATIO
78 SF
PROPERTY LINE N80°14'49"E 117.52'
(E) SIDEWALK
WHITEHAVEN TERR.
(E) DRIVEWAY
L= 45.20 R=35.00 D=073°59'46"
L= 33.69 R=35.00 D=073°59'46" N80°35'01"E 11.67'
PROPERTY LINE N09°24'59"W 136.13'
PROPERTY LINE N09°25'47"E 114.86'

PROPERTY LINE
(E) POOL
(E) FIREPIT

BRICK PILLARS

ADJACENT BUILDING
(E) LANDSCAPE
(E) LANDSCAPE

CTED TREE

ADJACENT BUILDING
W
E
G
W

ROOFED PATIO
154 SF
(E) SINGLE FAMILY RESIDENCE
906 WHITEHAVEN TER. SINGLE STORY TYPE V STRUCTURE W/ ATTACHED GARAGE 2e 3e 6e 9e
Ae
Be
Fe
Ge He
1 2
0 4 8 16 1/8"=1'-0"
(E) SETBACK, V.I.F. 9' - 1 1/4"
3'-4" 7'-5" 34'-0" 13'-5"
58'-2"
10'-6" 22'-6" 25'-7"
58'-7"
F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.F.O. FIN.F.O. FIN.F.O. FIN.
(E) BUILDING PAD
6"

EXTENT OF EXISTING

BUILDING PAD
(E) FRONT SETBACK (V.I.F.)
32'-11"
(E) FRONT SETBACK (V.I.F.)
15'-9"
(E) DRIVEWAY DEPTH
28'-5 1/4"
(E) SIDE SETBACK (V.I.F.) 18'-7 3/4"
(E) REAR SETBACK (V.I.F.)
44'-4 1/2"
(E) CONC. SLAB
(E) CONC. SLAB
(E) CONC. FOOTPATH
(TYP)
1/8" = 1'-0" 1 EXISTING SITE PLAN
design studio
ecumena

EXISTING SITE

PHOTOGRAPHIC SURVEYA
B
C
D
E
A
B
C
D
E
EXHIBIT 2 184 of 348

CITY OF GLENDALE, CA
DESIGN REVIEW STAFF REPORT – HILLSIDE SINGLE FAMILY
February 13, 2025 906 Whitehaven Terrace
Hearing Date Address
Design Review Board (DRB) 5649-006-014
Review Type APN
PDR-004219-2024 Harry Akopian
Case Number Applicant
Eric Ji Michael Mazmanian
Case Planner Owner
Project Summary
To add an 1,865 square-foot (SF) two-story addition and change the architectural style of the existing 1,938 SF single-story single-family residence with an attached 3-car garage constructed in 1973 on a 11,770 SF interior lot in the R1R-III (Restricted Residential Zone, Floor Area District III).

Environmental Review
The project is exempt from CEQA review as a Class 3 “New Construction or Conversion of Small Structures” exemption pursuant to Section 15303 of the State CEQA Guidelines because the project involves a construction of one single-family residence.

Existing Property/Background
The project site is a 11,770 SF interior lot with frontage on Whitehaven Terrace. The site was previously graded with initial development of the site. It is predominantly flat, level with the street, but and slopes down at the southern one-third of the property. The site is developed with a 1,938 SF one-story single-family residence with an attached 3-car garage developed in 1973. The project site is accessed via an existing driveway along Whitehaven Terrace that is to be maintained.

Staff Recommendation
Approve with Conditions
________________________________________________________________________ Last Date Reviewed / Decision
First time submittal for final review.

Zone: RIR FAR District: III
Although this design review does not convey final zoning approval, the project has been EXHIBIT 3
185 of 348
2 reviewed for consistency with the applicable Codes and no inconsistencies have been identified.

Active/Pending Permits and Approvals
None.

Site Slope and Grading
Less than 50% current average slope and less than 1500 cubic yards of earth movement (cut and/or fill); no additional review required.

Neighborhood Survey

DESIGN ANALYSIS
________________________________________________________________________ Site Planning
Are the following items satisfactory and compatible with the project site and surrounding area?
Building Location
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Setbacks of buildings on site
☐ Prevailing setbacks on the street
☐ Building and decks follow topography
☐ Alteration of landform minimized
Yards and Usable Open Space
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Avoid altering landform to create flat yards
☐ Outdoor areas integrated into open space
Average of
Properties within 300
linear feet of subject
property
Range of Properties
within 300 linear feet
of subject property
Subject Property
Proposal
Lot size 13,822 9,492 SF – 26,100 SF 11,770 SF
Setback 20 15’ – 30’ 20’
House size 2,445 SF 1,938 SF – 3,918 SF 3,803 SF
Floor Area Ratio 18% 7% – 28% 32%
Number of stories
n/a 1 – 2
7 one-story homes
and 5 two-story
homes
2 EXHIBIT 3
186 of 348
3 ☐ Use of retaining walls minimized
☐ Provide landscaping to reduce visual impact of retaining walls ☐ Decorative material used for retaining walls to blend into landscape and/or complement the building design
Garage Location and Driveway
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Consistent with predominant pattern on street
☐ Compatible with primary structure
☐ Permeable paving material
☐ Decorative paving
Landscape Design
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Complementary to building design and surrounding site ☐ Maintains existing trees when possible
☐ Maximizes permeable surfaces
☐ Appropriately sized and located
Walls and Fences
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Appropriate style/color/material
☐ Perimeter walls treated at both sides
☐ Retaining walls minimized
☐ Appropriately sized and located
☐ Stormwater runoff minimized
Determination of Compatibility: Site Planning
The proposed site planning is appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The design of the project takes the site’s topography into consideration by restricting the addition to the developed portion of the lot.
• Mechanical equipment and trash enclosure areas are screened behind the fence and gate on the eastern side yard of the residence.
• The new retaining walls will feature landscaping to minimize the visual impact of the retaining walls.
• The project plan proposes to extend the existing deck towards the rear which will be closer in line with the neighboring deck.

EXHIBIT 3
187 of 348
4 • The existing driveway will be replaced with a new decorative permeable paving in the same footprint and slope.
________________________________________________________________________ Massing and Scale
Are the following items satisfactory and compatible with the project site and surrounding area?
Building Relates to its Surrounding Context
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Appropriate proportions and transitions
☐ Impact of larger building minimized
Building Relates to Existing Topography
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Form and profile follow topography
☐ Alteration of existing land form minimized
☐ Retaining walls terrace with slope
Consistent Architectural Concept
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Concept governs massing and height
Scale and Proportion
☐ yes ☐ n/a ☒ no
If “no” select from below and explain:
☐ Scale and proportion fit context
☐ Articulation avoids overbearing forms
☐ Appropriate solid/void relationships
☐ Entry and major features well located
☐ Avoids sense of monumentality
The middle portion of the front façade containing the entry appears disproportionately large. A condition is recommended to redesign the front façade to reduce the perceived mass from the public street.

Roof Forms
☐ yes ☐ n/a ☒ no
If “no” select from below and explain:
☐ Roof reinforces design concept
☐ Configuration appropriate to context
EXHIBIT 3
188 of 348
5 The proposed addition creates a busy and disproportionate roof form. A condition is recommended to redesign the roof to provide variations that are proportionate for the residence.

Determination of Compatibility: Mass and Scale
The proposed massing and scale are appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The neighborhood consists of both one and two-story residences. The immediate west adjacent neighbor’s two-story residence is compatible with the proposed twostory addition. • The proposed design change from the existing Ranch style to contemporary farmhouse design features variations of roof forms and breaks in the facade to minimize the visual impact from the street.
• The building relates well with the existing topography because the dwelling will be located predominately on areas on the site previously graded with a flat pad. • The second story volume is stepped back from the street and towards the rear half of the existing home.
• The proposed two-story addition appears disproportionate and massive and features variations in the roof that are too busy and too high. A condition is recommended to redesign the roof plans to simplify its design, bring better proportions and reduce the mass and height of the house.
________________________________________________________________________ Design and Detailing
Are the following items satisfactory and compatible with the project site and surrounding area?
Overall Design and Detailing
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Consistent architectural concept
☐ Proportions appropriate to project and surrounding neighborhood ☐ Appropriate solid/void relationships
Entryway
☐ yes ☐ n/a ☒ no
If “no” select from below and explain:
☐ Well integrated into design
☒ Avoids sense of monumentality
☐ Design provides appropriate focal point
☐ Doors appropriate to design
The proposed plan features a monumental entry facing the street. A condition is recommended to redesign the entry to eliminate its monumental appearance.

EXHIBIT 3
189 of 348
6 Windows
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Appropriate to overall design
☐ Placement appropriate to style
☐ Recessed in wall, when appropriate
Privacy
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Consideration of views from “public” rooms and balconies/decks ☐ Avoid windows facing adjacent windows
Finish Materials and Color
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Textures and colors reinforce design
☐ High-quality, especially facing the street
☐ Respect articulation and façade hierarchy
☐ Wrap corners and terminate appropriately
☐ Natural colors appropriate to hillside area
Paving Materials
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Decorative material at entries/driveways
☐ Permeable paving when possible
☐ Material and color related to design
Lighting, Equipment, Trash, and Drainage
☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Light fixtures appropriately located/avoid spillover and over-lit facades ☐ Light fixture design appropriate to project
☐ Equipment screened and well located
☐ Trash storage out of public view
☐ Downspouts appropriately located
☐ Vents, utility connections integrated with design, avoid primary facades Ancillary Structures
EXHIBIT 3
190 of 348
7 ☒ yes ☐ n/a ☐ no
If “no” select from below and explain:
☐ Design consistent with primary structure
☐ Design and materials of gates complement primary structure Determination of Compatibility: Design and Detailing
The proposed design and detailing are appropriate, as modified by any proposed conditions, to the site and its surroundings for the following reasons:
• The project incorporates design details that are complementary to the contemporary farmhouse style of the single-family dwelling, such as limestone veneer, board and batten siding, and smooth stucco finish throughout the house. • The project proposes to utilize high-quality materials that reinforces the design of the home such as the aluminum clad wood windows, multi-width slate tile roof, stainless steel chimney cap, wooden door, ornamental wooden moldings, trims, corbels, and fascia, and lantern sconces.
• The new driveway will feature cobblestone paving and concrete paving with turf and limestone paving for the walkway to enhance the curb appeal of the property. • The proposed second-story balcony is set back from the rear yard to minimize privacy impacts on the neighboring property, which is situated at a lower elevation.

Additionally, the balcony extension will not significantly alter or enhance the existing view.
________________________________________________________________________ Recommendation / Draft Record of Decision
Based on the above analysis, staff recommends Approval with Conditions. This determination is based on the implementation of the following recommended conditions:

Conditions

1. Revise design of the second story volume to be more proportional and reduce the monumental entry.

2. Revise the design to reduce to variation of roof forms to be more proportional with the home.
________________________________________________________________________ Attachments

1. Reduced Plans

2. Photos of Existing Property

3. Location Map

4. Neighborhood Survey

EXHIBIT 3
191 of 348
TV
D
T
GFI
F
JB

GRID LINES

DESIGNATION (DRAWING OR DETAIL)

ELEVATION

SECTION

DETAIL CALLOUT

ROOM IDENTIFICATION
DOOR NUMBER / EXIST. DOOR DIM.

WINDOW NUMBER / EXIST. WINDOW DIM.

PLAN NOTES

MATERIAL NOTES

REVISION

POINT, DATUM POINT, WORK POINT

NORTH ARROW

SMOKE DETECTOR

CARBON MONOXIDE DETECTOR

DUPLEX ELECTRICAL OUTLET

GROUND FAULT CIRCUIT-INTERRUPTER

TELEVISION OUTLET

TELEPHONE OUTLET

CEILING MOUNTED LIGHT FIXTURE

RECESSED CEILING MOUNTED LIGHT

FIXTURE

RECESSED CEILING MOUNTED

FLUORESCENT LIGHT FIXTURE

INCANDESCENT WALL MOMUNTED LIGHT
FIXTURE 66" A.F.F. (BY OWNER)

JUNCTION BOX

FAN EXHAUST
WALL SWITCH @+48" A.F.F.

DIMMER SWITCH @+48" A.F.F.
1 1 View Name
1/8" = 1'-0"
A-101
1 1
A101
SIM
A101
1 SIM
Name
150 SF
1i 6' 8"
2' 8"
HEIGHT 1i 1' - 0"
1' - 0" WIDTH
1 1
1 HEIGHT
WIDTH

PROPERTY LINE

SETBACK LINE

BREAK LINE
DIM

DIMENSION LINE

BATT INSULATION

WOOD BLOCKING

PLYWOOD

WOOD, FINISH

METAL LATH & PLASTER

WOOD FRAMING

CONCRETE
STEEL

CONCRETE

LANDSCAPING

EXISTING WOOD

STUD WALL
NEW 2x WOOD

STUD WALL

EXISTING STRUCTURE

TO BE DEMOLISHED

GRADE OR EARTH
SITE
FH

ARCHITECT / ARCHITECTURAL TEAM
NAME/LIC.: HAROUT AKOPIAN | C-37146
ADDRESS: 3786 LA CRESCENTA AVE. UNIT 201 GLENDALE, CA 91208 PHONE: 818 818 9636
EMAIL: [email protected]

STRUCTURAL ENGINEER OF RECORD
NAME: ARMEN MARTIROSSYAN
635 N. COLORADO BLVD. GLENDALE, CA 91204
ADDRESS:

PHONE: 818 434 1708
EMAIL: [email protected]
CLIENT
NAME: MR. MIKE MAZMANIAN
906 Whitehaven Terrace,
Glendale, CA 91207
ADDRESS:

PHONE: 818 434 3414
EMAIL: [email protected]

ARPA TECHNOLOGY GROUP

STATE/FEDERAL
• 2022 CALIFORNIA BUILDING VOL. 1/2
• 2022 CALIFORNIA RESIDENTIAL CODE
• 2022 CALIFORNIA PLUMBING CODE
• 2022 CALIFORNIA MECHANICAL CODE
• 2022 CALIFORNIA ELECTRICAL CODE
• 2022 CALIFORNIA ENERGY CODE
• 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
• 2022 CALIFORNIA FIRE CODE
LOCAL
• 2023 GLENDALE BUILDING CODE
• 2023 GLENDALE ZONING CODE
• 2023 GLENDALE BUILDING & SAFETY REACH CODE

DEMOLITION
• 1395 SF OF EXISTING ROOF
• WINDOWS AND DOORS PER PLANS
• INTERIOR WALLS PER PLANS
NEW
• EXISTING 1938 SF SINGLE FAMILY SINGLE STORY RESIDENCE W/ 3 BEDROOM AND 2

BATH(S)

1. 1764 SF ADDITION AT FIRST FLOOR AND NEW SECOND FLOOR A. 5 BEDROOMS AND 5 BATHS TOTAL
• INTERIOR RENOVATION AT FIRST FLOOR PER PLANS
ZONE

FRONT SETBACK PER ZONE // ACTUAL (FT)

SIDE SETBACK PER ZONE // ACTUAL (FT)

REAR SETBACK PER ZONE // ACTUAL (FT)
(N) BUILDING STORIES
MAX. BUILDING HEIGHT // (N) BLDG. HGT. (FT)
F.A.R. PER ZONE // ACTUAL (%)
LOT COVERAGE PER ZONE // ACTUAL (%)
LANDSCAPING PER ZONE // ACTUAL (%)
R1R III
15' // 15' - 4 1/2"
5' (PRE 1991) 10' // (E) 9' - 1", (N 2ND FLR) 13'
5' (PRE 1991) 10' // 44' - 2 1/2"
2 32' (35' FOR ROOFED AREA 3:12) // (N) 24' - 1"
.45(10,000)+ .1(1770) = 4677 MAX // 3803/11770= 32%
.40 (11,770) = 4708 MAX // 3593/11770 = 30%
.40 (11,770) = 4708 MIN // 5328/11770 = 45%
PARKING REQ'D // PARKING PROPOSED 3 // 3
A.P.N.

TRACT
LOT
5649-006-014
21941
48 OCCUPANCY GROUP

LOT SIZE

LOT AREA (SF)
(E) FIRST FLOOR AREA (SF)
(E) GARAGE AREA (SF)

TYPE OF CONSTRUCTION

FIRE SPRINKLER (EXISTING / NEW)

YEAR BUILT

VHFSZ / WUI
R3-U
107 X 110 (IRREGULAR)
11,770
1,938 (ASSESSOR)
471 (AS-BUILTS)
V-B
NO
1973
YES (CRC 337)
ZONING: AREA TABULATION BREAKDOWN

GROSS FIRST FLOOR AREA

COVERED PORCH/AWNING
GARAGE

EXISTING (SF) NEW (SF) EXEMPT (SF) TOTAL (SF)
1,938
232
471
5122
420
188
615
SEE L0.01
0 0
615
-
2459
188
-
SEE L0.01
(E) FRONT/REAR PORCH AREA 154 (FRONT) + 78 (REAR) = 232 (E) BUILDING HEIGHT 14' - 4"
(E) NUMBER OF STORIES 1

LANDSCAPE AREA
CLIMATE ZONE ZONE 9
GROSS SECOND FLOOR AREA 0 1344 0 1344
BALCONY 0 328 0 328
LOT COVERAGE 3097 3593 - 3593
TOTAL FLOOR AREA 3803
(E) PARKING 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
1/9/2025 2:46:21 PM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

COVER SHEET
G001
CA
HA
2024-038
PLANNING SUBMITTAL (DRAFT) 07/24/2024
2 STORY SINGLE FAMILY RESIDENCE ADDITION
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207

ABBREVIATIONS SYMBOLS LEGEND MATERIAL SYMBOLS & LINEWORK SHEET INDEX BUILDING STATISTICS

APPLICABLE CODES

SCOPE OF WORK

VICINITY MAP

ZONING INFO

PROJECT TEAM LEGAL DESCRIPTION

ARCHITECTURAL
G001 COVER SHEET 01/09/25
G002 MATERIAL BOARD AND PERSPECTIVES 01/09/25
G003 GENERAL NOTES 01/09/25
G004 GENERAL NOTES 01/09/25
A050 EXISTING SITE PLAN 01/09/25
A060 EXISTING FLOOR PLAN 01/09/25
A070 DEMO FLOOR PLAN 01/09/25
A080 AREA CALCULATIONS 01/09/25
A100 SITE PLAN 01/09/25
A101 SITE SECTION 01/09/25
A102 FIRST FLOOR PLAN 01/09/25
A103 SECOND FLOOR PLAN 01/09/25
A104 ROOF PLAN 01/09/25
A201 EXTERIOR ELEVATIONS 01/09/25
A202 EXTERIOR ELEVATIONS 01/09/25
A300 BUILDING SECTIONS 01/09/25
A401 DOOR AND WINDOW SCHEDULES 01/09/25
A090 TEMPORARY FRAME PLAN 01/09/25
A091 TEMPORARY FRAME ELEVATIONS 01/09/25
L0.01 LANDSCAPE TITLE SHEET 01/09/25
L0.02 GENERAL NOTES 01/09/25
L1.00 CONSTRUCTION PLAN 01/09/25
L1.01 STAKING PLAN 01/09/25
L2.00 IRRIGATION PLAN 01/09/25
L2.10 IRRIGATION DETAILS 01/09/25
L2.11 IRRIGATION DETAILS 01/09/25
L3.00 PLANTING PLAN 01/09/25
L3.10 PLANTING NOTES & DETAILS 01/09/25
L4.00 LIGHTING PLAN 01/09/25
L5.00 WATER USE PLAN 01/09/25
A

AFF ABOVE FINISHED FLOOR

ACC ACCESSIBLE

ACT ACOUSTIC CEILING TILE

ADJ ADJACENT

AC AIR CONDITIONING

ALUM ALUMINUM
& AND

ARCH ARCHITECTURAL

AD AREA DRAIN
@ AT

ATTN ATTENTION
B

BSMNT BASEMENT

BM BEAM

BLW BELOW

BIT BITUMINOUS

BLK BLOCKING

BD BOARD

BO BOTTOM OF

BRK BRICK

BLDG BUILDING
C

CPT CARPET
CIP CAST-lN-PLACE

CB CATCH BASIN

CLG CEILING

CEM CEMENT

CTR CENTER

CL CENTERLINE

CER CERAMIC

CT CERAMIC TILE

CH CHILLER

CO CLEANOUT

CLR CLEAR

CCTV CLOSED CIRCUIT TELEVISION

CW COLD WATER

COL COLUMN

CONC CONCRETE

CMU CONCRETE MASONRY UNIT

CONT CONTINUOUS

CJ CONTROL JOINT

CORR CORRIDOR

CNTR COUNTER
D

DEG DEGREE

DEMO DEMOLISH OR DEMOLITION

DEPT DEPARTMENT

DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DW DISHWASHER

DR DOOR

DO DOOR OPENING

DBL DOUBLE

DN DOWN

DS DOWNSPOUT

DRN DRAIN

DWG DRAWING
E

EA EACH

ES EACH SIDE
E EAST

ELEC ELECTRICAL

EP ELECTRICAL PANEL

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

EPDM ETHYLENE PROPYLENE DIENE M-CLASS
(E) EXISTING

EJ EXPANSION JOINT

EXT EXTERIOR
F

FB FACE BRICK

FO FACE OF

FT FEET/FOOT

FIN FINISH

FF FINISH FLOOR ELEVATION

FA FIRE ALARM

FE FIRE EXTINGUISHER

FH FIRE HYDRANT

FR FIRE RESISTANT

FIXT FIXTURE

FLR FLOOR

FD FLOOR DRAIN

FTG FOOTING

FND FOUNDATION

FURN FURNITURE

FF&E FURNITURE, FIXTURES AND EQUIPMENT
G

GALV GALVANIZED

GSM GALVANIZED SHEET METAL

GV GAS VALVE

GA GAUGE

GC GENERAL CONTRACT(OR)

GL GLASS

GFRC GLASS FIBER REINFORCED CONCRETE

GRFG GLASS FIBER REINFORCED GYPSUM

GLAZ GLAZING

GYP GYPSUM

GWB GYPSUM WALL BOARD
H

HC HANDICAPPED

HTG HEATING

HVAC HEATING VENTILATION & AIR CONDITIONING

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HB HOSE BIBB

HW HOT WATER

HWT HOT WATER TANK

HR HOUR
I

IN INCH/INCHES

INCL INCLUDED/INCLUDING

INFO INFORMATION

ID INSIDE DIAMETER

INSUL INSULATED OR INSULATION

INT INTERIOR

INV INVERT
J

JAN JANITOR

JST JOIST
K

KIT KITCHEN
L

LAM LAMINATE

LAV LAVATORY

LT LIGHT

LB POUNDS
M

MFR MANUFACTURER

MAS MASONRY

M MASTER

MAX MAXIMUM

MECH MECHANICAL

MED MEDIUM

MTL METAL

MIN MINIMUM

MISC MISCELLANEOUS

MULL MULLION
N
(N) NEW

NC NOISE CRITERIA

NOM NOMINAL

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NO NUMBER
O

OFF OFFICE

OC ON CENTER

OPNG OPENING

OPP OPPOSITE

OD OUTSIDE DIAMETER

OD OVERFLOW DRAIN

OH OVERHEAD
P

P PAINT

PNT PAINT OR PAINTED

PNL PANEL

PTN PARTITION

PAV PAVING

PERF PERFORATED

PERP PERPENDICULAR

PLAS PLASTER

PLB PLUMBING

PLYWD PLYWOOD

PT POINT

PVC POLYVINYL CHLORIDE

PLF POUNDS PER LINEAR FOOT

PSF POUNDS PER SQUARE FOOT

PC PRECAST

PREFAB PREFABRICATED

PT PRESSURE TREATED

PL PROPERTY LINE
Q

QTY QUANTITY
R

RAD RADIUS

R RADIUS/RISER

RTD RATED

RTG RATING

REF REFERENCE

RCP REFLECTED CEILING PLAN

REF REFRIGERATOR

REINF REINFORCED

REQ REQUIRE/REQUIRED

RB RESILIENT BASE

RA RETURN AIR

REV REVISION/REVISED

RD ROOF DRAIN

RM ROOM

RO ROUGH OPENING
S

SCHED SCHEDULE

SAF SELF ADHERED FLASHING

SB SETBACK

SHT SHEET

SM SHEET METAL

SWR SHOWER

SIM SIMILAR

SC SOLID CORE

STC SOUND TRANSMISSION COEFFICIENT

S SOUTH

SPKR SPEAKER

SPEC SPECIFICATION

SPEC SPECIFIED OR SPECIFICATION

SH SPRINKLER HEAD

SF SQUARE FEET/FOOT

SS STAINLESS STEEL

STL STEEL

STOR STORAGE

SD STORM DRAIN

ST STRUCTURAL

SA SUPPLY AIR

SM SURFACE MOUNTED

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM
T

TEL TELEPHONE/TELECOM

TV TELEVISION

TEMP TEMPERED

THK THICKNESS

THRU THROUGH

T&G TONGUE AND GROOVE

T&B TOP AND BOTTOM

TO TOP OF

T TREAD

TYP TYPICAL
U

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED
V

VAR VARIES

VIF VERIFY IN FIELD

VERT VERTICAL

VEST VESTIBULE
W

WC WATER CLOSET

WV WATER VALVE

WP WATERPROOF/WATERPROOFING

WRB WEATHER RESISTANT BARRIER

WS WEATHER-STRIPPING

WT WEIGHT
W WEST

WIN WINDOW

W/ WITH

W/O WITHOUT

WD WOOD
REV. NO. REVISION DATE

AHJ APPROVALS

DEFERRED SUBMITTALS

CONTRACTOR GENERAL NOTES
• MECHANICAL
• FIRE SPRINKLER
• ELECTRICAL
• PLUMBING
• SOLAR
• APPROVAL OF PLANS AND SPECIFICATIONS DOES NOT PERMIT THE VIOLATION OF ANY SECTION OF THE BUILDING CODE OR OTHER CITY ORDINANCE OR STATE LAW. • THE CONTRACTOR MUST PROVIDE PUBLIC PROTECTION IN ACCORDANCE WITH CBC SECTION 3306.1 FOR WORK ON ANY BUILDING AND STRUCTURE ADJACENT TO THE PUBLIC WAY.

EXHIBIT 3 192 of 348
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:13:51 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

MATERIAL BOARD AND

PERSPECTIVES
G002
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE

FRONT PERSPECTIVE REAR PERSPECTIVE

PERSPECTIVE
EAST

PERSPECTIVE
WEST
EXHIBIT 3
193 of 348

01. GENERAL NOTES:

0.1 THE DRAWINGS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, DIMENSIONS, AND MAJOR CONSTRUCTION ELEMENTS. AS

SUCH, THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.

ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.

0.2 WORK INDICATED ON THE DRAWINGS AS (N.I.C.) IS NOT IN THE CONTRACT. SUBSEQUENT

DRAWINGS AND SPECIFICATIONS WILL BE SUBMITTED BY OTHERS FOR SEPARATE APPROVAL AND SEPARATE BUILDING PERMITS. THE CONTRACTOR SHALL COORDINATE ALL THE TRADES OF HIS WORK DIRECTLY OR INDIRECTLY INVOLVED WITH APPROVED ADDITIONAL WORK.

0.3 ALL WORK, CONSTRUCTION AND MATERIALS SHALL COMPLY WITH ALL PROVISIONS OF THE

BUILDING CODE AND WITH OTHER RULES REGULATIONS AND ORDINANCES GOVERNING THE PLACE OF THE BUILDING. BUILDING CODE REQUIREMENTS TAKE PRECEDENCE OVER THE DRAWINGS AND

IT SHALL BE THE RESPONSIBILITY OF ANY ONE SUPPLYING LABOR OR MATERIALS OR BOTH TO

INSTALL HIS WORK IN CONFORMANCE WITH THE CODE AND TO BRING TO THE ATTENTION OF THE

OWNER ANY DISCREPANCIES OR CONFLICT BETWEEN THE REQUIREMENTS OF THE CODE AND THE DRAWINGS.
*0.4 THE BUILDING DESIGN MEETS THE REQUIREMENTS OF TITLE 24.

0.5 ALL WORK PERFORMED BY THE CONTRACTOR/SUB-CONTRACTOR SHALL CONFORM TO THE

REQUIREMENTS OF MUNICIPAL, LOCAL OR FEDERAL AND STATE LAWS, AS WELL AS ANY OTHER GOVERNING REQUIREMENTS, WHETHER OR NOT SPECIFIED ON THE DRAWINGS.

0.6 WHERE THE CONTRACT NOTES OR DRAWINGS CALL FOR, ANY WORK OF A MORE STRINGENT

NATURE THAN THAT REQUIRED BY THE BUILDING CODE OR ANY OTHER DEPARTMENT HAVING

JURISDICTION OVER THE WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED FOR BY THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS SHALL BE FURNISHED IN ALL CASES.

0.7 ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEIR EXACT MEANING, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.

0.8 ALL DIMENSIONS SHALL BE CONSIDERED "NOMINAL" UNLESS NOTED OTHERWISE. NOTED DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE OF DRAWINGS. DO NOT "SCALE" DRAWINGS.

LARGE SCALE DETAILS GOVERN OVER SMALLER SCALE DETAILS.

0.9 ALL DIMENSIONS SHOWN ON THE DRAWINGS ARE TO FACE OF FINISH, TYP, UNLESS NOTED OTHERWISE. DIMENSIONS TO EXT. WALLS ARE TO FACE OF STUD (F.O.S.). COLUMN DIMENSIONS ARE TO CENTERLINE OF COLUMN, TYP.

0.10 ANY DIMENSIONS, DETAILS, NOTES AND/OR SYMBOLS THAT APPLY TO ONE UNIT, APPLY TO ALL UNITS IN LIKE SITUATIONS UNLESS NOTED OTHERWISE.

0.11 ALL "ECUMENA DESIGN STUDIO" DRAWINGS AND ALL CONSTRUCTION NOTES ARE

COMPLEMENTARY, AND WHAT IS CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL. ANY WORK SHOWN OR REFERRED TO ON ANY ONE SET OF DRAWINGS SHALL BE PROVIDED AS THOUGH SHOWN ON ALL RELATED DRAWINGS.

0.12 THE GENERAL CONTRACTOR SHALL NOTIFY "ECUMENA DESIGN STUDIO" IMMEDIATELY OF ANY

DISCREPANCIES OR OMISSIONS BETWEEN THE DRAWINGS, THESE NOTES, AND FIELD CONDITIONS BEFORE COMMENCING ANY WORK AND REQUEST CLARIFICATION.

0.13 THE USE OF THE WORDS "PROVIDE" OR "PROVIDED" IN CONNECTION WITH ANY ITEM

SPECIFIED IS INTENDED TO MEAN, UNLESS NOTED OTHERWISE, THAT WHICH SHALL BE FURNISHED AND INSTALLED, AND CONNECTED WHERE SO REQUIRED.

0.14 WHERE THE TERMS "APPROVED EQUAL", "OTHER APPROVED", "EQUAL TO", "ACCEPTABLE" OR

THE OTHER GENERAL QUALIFYING TERMS ARE USED IN THESE NOTES, IT SHALL BE UNDERSTOOD THAT REFERENCE IS MADE TO THE RULING AND JUDGMENT OF THE "ECUMENA DESIGN STUDIO".

0.15 THE GENERAL CONTRACTOR SHALL SUPPLY CUT SHEET SPECIFICATIONS OF ALL FIXTURES AND EQUIPMENT CALLED FOR ON DRAWING, I.E. LIGHT FIXTURES, HARDWARE, ETC.

0.16 THE GENERAL CONTRACTOR SHALL HAVE TEN WORKING DAYS FROM AWARD OF THE

CONTRACT TO SUBMIT SUBSTITUTIONS OF SPECIFIED PRODUCTS OR WORK FOR REVIEW BY THE "ECUMENA DESIGN STUDIO". HE SHALL INCLUDE CUT SHEETS WITH SPECIFICATIONS AND REASONS FOR SUBSTITUTION. THE "ECUMENA DESIGN STUDIO" SHALL RESPOND IN TEN WORKING DAYS TO SUBMITTAL. NO SUBSTITUTIONS SHALL BE ACCEPTED AFTER THE INITIAL TIME LIMIT HAS PASSED.

0.17 THE GENERAL CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF

CONSTRUCTION DRAWINGS ON SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL TRADES.

0.18 THE GENERAL CONTRACTOR SHALL SEE THAT ALL SUB-CONTRACTORS RECEIVE COMPLETE

SETS OF WORKING DRAWINGS OR ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK WHEN COMPLETE SETS ARE NOT AVAILABLE TO SUB- CONTRACTORS.

0.19 WHERE SPECIAL ITEMS REQUIRE EXTENDED LEAD TIME PREVENTING INSTALLATION BY

PROJECTED MOVE-IN DATE, CONTRACTOR IS TO PROPOSE AN AVAILABLE ALTERNATE FOR APPROVAL BY THIS OFFICE. AND CLIENT AS WELL AS TO PREPARE PRICING FOR POSSIBLE TEMPORARY ASSEMBLIES.

0.20 THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY OF ALL PARTIES PRESENT ON THE JOB SITE IS THE RESPONSIBILITY OF THE CONTRACTOR.

0.21 THE GENERAL CONTRACTOR UPON ACCEPTANCE AND APPROVAL OF THE DRAWINGS

ASSUMES FULL RESPONSIBILITY FOR THE CONSTRUCTION, MATERIALS, AND WORKMANSHIP OF THE

WORK DESCRIBED IN THESE NOTES AND DRAWINGS, AND HE WILL BE EXPECTED TO COMPLY WITH THE SPIRIT AS WELL AS THE LETTER IN WHICH THEY WERE WRITTEN. *0.22 TEMPORARY PEDESTRIAN PROTECTION SHALL BE PROVIDED AS REQUIRED BY CHAPTER 33 SECTION 3306 CBC. A PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS IS REQUIRED FOR A PROTECTION FENCE OR CANOPY ON OR OVER ANY STREET OR PUBLIC SPACE.

0.23 THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBILE FOR THE REMOVAL,

REPLACEMENT AND RECTIFICATION OF ALL DAMAGED AND DEFECTIVE MATERIAL AND WORKMANSHIP IN CONNECTION WITH THE CONTRACT WORK. HE SHALL REPLACE OR REPAIR AS

DIRECTED ALL SUCH DAMAGED OR DEFECTIVE MATERIALS WHICH SHALL APPEAR WITHIN A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION.

0.24 THE GENERAL CONTRACTOR, HIS SUB-CONTRACTOR AND ANY OTHER CONTRACTOR

INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE OR ILL- TIMED WORK AS A RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS,

IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY THE PARTY RESPONSIBLE THEREFORE.

0.25 CONTRACTOR SHALL IDENTIFY AND DESCRIBE PROTECTION MEASURES TO BE UTILIZED

DURING CONSTRUCTION TO PROTECT ADJOINING AREAS FROM NOISE, DUST, DIRT, FIRE HAZARDS AND OTHER POTENTIAL PROBLEMS CAUSED BY CONSTRUCTION.

0.26 THE GENERAL CONTRACTOR SHALL EXERCISE STRICT DUST CONTAINMENT CONTROL OVER JOB TO PREVENT DIRT OR DUST FROM LEAVING THE JOB SITE.

0.27 STRUCTION OR DEMOLITION OF ANY BUILDING, STRUCTURE, SCAFFOLDING OR FALSEWORK MORE THAN 3 STORIES OR 36' IN HEIGHT, REQUIRES A PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE ISSUE OF A BUILDING PERMIT.

0.28 THE GENERAL CONTRACTOR SHALL PROPERLY PROTECT THE EXISTING BUILDING TO REMAIN

AND ANY ADJOINING PROPERTY OR WORK AND ANY DAMAGE TO SAME, CAUSED BY HIS WORK OR WORKMEN MUST BE MADE GOOD WITHOUT DELAY. PATCHING AND REPLACING OF DAMAGED WORK SHALL BE DONE BY THE GENERAL CONTRACTOR.

0.29 THE CONTRACTOR MUST PROVIDE TEMPORARY LIGHTING ON THE JOB SITE.

0.30 ALL REQUIRED EXITS, WAYS OF APPROACH THERETO, AND WAYS OF TRAVEL FROM THE EXIT

INTO THE STREET SHALL CONTINUOUSLY BE MAINTAINED FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS FOR UNOBSTRUCTED EGRESS IN THE CASE OF FIRE OR OTHER EMERGENCY.

0.31 DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED.

0.32 THE GENERAL CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS, BOTH

FROM HIS OWN AND OTHER SUBCONTRACTORS EMPLOYEES, INCLUDING THAT RUBBISH WHICH IS A BY-PRODUCT OF CARPET AND CABINET INSTALLATION, TELEPHONE COMPANY INSTALLATION, ETC.

AND PROVIDE FOR ITS REMOVAL FROM THE SITE.

0.33 AT THE END OF EACH DAY OF CONSTRUCTION OR FINISH WORK, EACH TRADE SHALL BE RESPONSIBLE FOR REMOVING ANY DEBRIS FROM THE SITE. THE JOB SITE SHALL BE CLEANED TO

THE SATISFACTION OF THE CLIENT AND THIS OFFICE UPON COMPLETION OF THE PROJECT BY THE CONTRACTOR.

0.34 NO COMBUSTIBLE RUBBISH DURING CONSTRUCTION SHALL BE STORED IN BUILDING. IT SHALL BE REMOVED DAILY.

0.35 THE GENERAL CONTRACTOR SHALL VERIFY SIZE, ELECTRICAL REQUIREMENTS, LOCATION

AND CHARACTERISTICS OF ALL WORK AND/OR EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS, WITH THE MANUFACTURER OR SUPPLIER PRIOR TO THE START OF RELATED WORK.

0.36 CONTRACTOR SHALL CHECK AND VERIFY SIZE AND LOCATION OF DUCT OPENINGS AND PLUMBING RUNS WITH MECHANICAL CONTRACTOR BEFORE FORMING WALLS, FLOORS, etc... .

0.37 CONTRACTOR SHALL PROVIDE AND LOCATE ACCESS PANELS AS REQUIRED AFTER

INSTALLATION OF MECHANICAL DUCTS, PLUMBING, ELECTRICAL AND FIRE SPRINKLER WORK, ACCESS PANELS TO BE APPROVED BY THE DESIGNER.

0.38 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING,

HANGERS OR OTHER SUPPORT FOR ALL FIXTURES, EQUIPMENT, CABINETRY, FURNISHINGS AND ALL OTHER ITEMS REQUIRING THE SAME.

0.39 ALL EXISTING APPURTENANCES NOT BEING REMOVED SHALL BE REFURBISHED WHERE REQUIRED. ANY LOOSE ITEMS TIGHTENED (CEILING EXIT SIGNS, ETC.) AND ANY MISSING PARTS

REPLACED BY THE GENERAL CONTRACTOR TO ACHIEVE A FINISHED FIRST CLASS INSTALLATION AND APPEARANCE.

0.40 THE GENERAL CONTRACTOR SHALL SUBMIT ALL FABRICATION SHOP DRAWINGS AND FIXTURE CUTS TO THE "ECUMENA DESIGN STUDIO" FOR REVIEW. THE "ECUMENA DESIGN STUDIO" SHALL HAVE 40 WORKING HOURS (5 DAYS) SHOP DRAWING TURN-AROUND TIME FROM DATE OF RECEIPT. ALL SHOP DRAWINGS AND CUTS SIGNED "REVIEWED" SHALL SUPERSEDE ORIGINAL DRAWINGS IN DESIGN APPEARANCE ONLY. CONTRACTORS SHALL ASSUME RESPONSIBILITY FOR ERRORS IN THEIR DRAWINGS.

0.41 ALL FINISH CONTRACTORS TO FIELD VERIFY SIZE OF ROOMS AND WALLS PRIOR TO PLACING ORDERS.

0.42 THE GENERAL CONTRACTOR, SUB-CONTRACTOR AND TENANTS CONTRACTOR SHALL SUBMIT CERTIFICATES TO THE "ECUMENA DESIGN STUDIO" UPON COMPLETION OF WORK, INCLUDING BUT NOT LIMITED TO THE FOLLOWING - a) FIREPROOF WOOD TEST REPORT (IF REQUIRED) b) ELECTRICAL, PLUMBING AND AIR CONDITIONING CERTIFICATES ISSUED BY:
-DEPARTMENT OF WATER SUPPLY, GAS AND ELECTRICITY
-BOARD OF FIRE UNDERWRITERS

2. EXITS & STAIRS:

2.1 THE MEANS OF EGRESS SHALL PROVIDE A CONTINUOUS AND UNOBSTRUCTED PATH OF

VERTICAL AND HORIZONTAL EGRESS TRAVEL FROM ALL PORTIONS OF THE DWELLING TO THE

EXTERIOR OF THE DWELLING AT THE REQUIRED EGRESS DOOR WITHOUT REQUIRING TRAVEL THROUGH A GARAGE. THE REQUIRED EGRESS DOOR SHALL OPEN DIRECTLY INTO A PUBLIC WAY OR TO A YARD OR COURT THAT OPENS TO A PUBLIC WAY.(R311.1)

2.2 EMERGENCY EGRESS. EVERY SLEEPING ROOM SHALL HAVE AT LEAST ONE OPERABLE WINDOW OR EXTERIOR DOOR APPROVED FOR EMERGENCY ESCAPE. THESE EMERGENCY ESCAPE WINDOWS

OR DOORS MUST PROVIDE A FULL CLEAR OPENING AND SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF SPECIAL TOOLS. ONE OPENABLE WINDOW WITH AN OPENABLE AREA OF NOT LESS THAN 5.7 SQ. FT., MINIMUM CLEAR 24" HEIGHT AND 20" WIDTH, AND A SILL HEIGHT NOT OVER 44" ABOVE THE FLOOR IS REQUIRED IN ALL BEDROOMS BELOW THE FOURTH STORY AND BASEMENT. (1030.2)

2.3 EXIT DOORS SHALL BE NOT LESS THAN 36" IN WIDTH AND NOT LESS THAN 6'8" IN HEIGHT.

2.4 ENTRY/EXIT DOOR MUST OPEN OVER A LANDING NOT MORE THAN 1.5" BELOW THE THRESHOLD.

EXCEPTION: PROVIDING THE DOOR DOES NOT SWING OVER THE LANDING. LANDING SHALL BE NOT MORE THAN 7.75" BELOW THE THRESHOLD. STORM AND SCREEN DOORS ARE PERMITTED TO SWING OVER ALL EXTERIOR STAIRS AND LANDINGS. (R311.3.1)

2.5 ALL INTERIOR AND EXTERIOR STAIRWAYS SHALL BE PROVIDED WITH MEANS TO ILLUMINATE THE STAIRS, INCLUDING LANDINGS AND TREADS. INTERIOR STAIRWAYS SHALL BE PROVIDED WITH ARTIFICIAL LIGHTING LOCATED AT EACH LANDING OF THE STAIRWAY. EXTERIOR STAIRWAYS SHALL BE PROVIDED WITH ARTIFICIAL LIGHTING LOCATED AT THE TOP LANDING OF THE STAIRWAY.

EXTERIOR STAIRWAYS PROVIDING ACCESS TO A BASEMENT FROM THE OUTSIDE SHALL BE PROVIDED WITH ARTIFICIAL LIGHTING AT THE BOTTOM LANDING OF THE STAIRWAY. (R303.7 CRC) EXCEPTION: A LIGHT SOURCE IS NOT REQUIRED AT THE TOP AND BOTTOM LANDING PROVIDED A LIGHT SOURCE IS LOCATED OVER EACH STAIRWAY SECTION.

LIGHT ACTIVATION (R303.7 CRC): WHERE LIGHTING OUTLETS ARE INSTALLED IN INTERIOR

STAIRWAYS, THERE SHALL BE A WALL SWITCH AT EACH FLOOR LEVEL TO CONTROLLED LIGHTING OUTLETS WHERE THE STAIRWAY HAS SIX OR MORE RISERS. THE ILLUMINATION OF EXTERIOR STAIRWAYS SHALL BE CONTROLLED FROM THE INSIDE OF THE DWELLING UNIT.

EXCEPTION: LIGHTS THAT IS CONTINUOULY ILLUMINATED OR AUTOMATICALLY CONTROLLED.

2.6 LANDING AT A DOOR SHALL HAVE A LENGTH MEASURED IN THE DIRECTION OF TRAVEL OF NO LESS THAN 36". (R311.3)

2.7 A LANDING SHALL BE PROVIDED AT THE TOP AND BOTTOM OF STAIRWAYS. (R311.7.6)

2.8 SPIRAL STAIRWAY SHALL NOT SERVE AS REQIRED EXIT FOR AN AREA EXCEEDING 400 SQ.FT.

3. CONSTRUCTION NOTES:

3.1 PROVIDE 2 COATS OF INDUSTRIAL GLOSS ENAMEL (INTERIOR/EXTERIOR) OVER PRIMER ON ALL

EXPOSED STRUCTURAL STEEL MEMBERS, STEEL SUPPORT STRUCTURAL RAILINGS PIPE CHANNELS AND BRACINGS.

3.2 ALL NON-CONCRETE SURFACES UNLESS NOTED OTHERWISE, TO BE PAINTED SHALL RECEIVE A MINIMUM OF THREE COATS OR TWO COATS ON PRIMER. CONCRETE TO BE ONE COAT OVER PRIMER.

3.3 FLOOR SURFACES SHALL BE SLIP RESISTANT MEETING THE REQUIREMENTS OF CALIFORNIA TITLE 24.

3.4 ALL UTILITIES ARE REQUIRED TO BE UNDERGROUND ON THIS SITE AND SHALL BE UNDERGROUND FROM PROPERTY LINE TO BUILDING.

3.5 SOILS REPORT AND COMPACTION REPORTS ARE TO BE SUBMITTED TO AND APPROVED BY THE BUILDING DEPARTMENT PRIOR TO FOUNDATION INSPECTION.

3.6 THERE SHALL BE NO TRENCHES OR EXCAVATIONS 5' OR MORE IN DEPTH INTO WHICH A

PERSON IS REQUIRED TO DESCEND, UNLESS A PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT.

3.7 TEMPORARY TOILET. MAINTAIN SANITARY TOILET FACILITIES DURING CONSTRUCTION.

3.8 WELDING SHALL BE DONE BY CITY BUILDING DEPARTMENT CERTIFIED WELDERS.

3.9 FOUNDATION. DEPTH OF FOOTINGS: MINIMUM OF 24" INTO NATURAL GRADE OR APPROVED COMPACTED FILL UNLESS SHOWN OTHERWISE ON THE DRAWINGS. SEE ALSO STRUCTURAL DRAWINGS AND SOIL REPORT.

3.10 PROVIDE MINIMUM 12" CLEARANCE UNDER FLOOR GIRDERS AND MINIMUM 18" CLEARANCE UNDER FLOOR JOISTS IN THE CRAWL SPACE AREA.

3.11 MUDSILLS. ALL WOOD IN CONTACT WITH CONCRETE AND WITHIN 48" OF GRADE SHALL BE EITHER FOUNDATION GRADE REDWOOD OR PRESSURE-TREATED DOUGLAS FIR.

3.12 ALL WEATHER-EXPOSED SURFACES SHALL HAVE A WEATHER-RESISTIVE BARRIER TO

PROTECT THE INTERIOR WALL COVERING AND THAT EXTERIOR OPENINGS SHALL BE FLASHED IN SUCH A MANNER AS TO MAKE THEM WEATHERPROOF.

3.13 ALL NOISE BARRIER BATTS (SOUND INSULATION) SHALL BE NON-COMBUSTIBLE.

3.14 WOOD/EARTH SEPARATION MINIMUM 8" CLEARANCE, EXCEPT SEPARATION BY CONCRETE MAY BE 2" MINIMUM.

3.15 STUD WALLS. TYPICAL WALLS SHALL BE FRAMED WITH 2x4 AT 16" o.c. EXCEPT WHERE NOTED OTHERWISE. CRIPPLES OR WALLS BEARING TWO STORIES ABOVE SHALL BE FRAMED WITH 2X6 OR 3X4 STUDS AT 16"O.C. EXCEPT WHERE NOTED OTHER- WISE AT EXTERIOR WALLS AND BEARING WALLS, STUDS SHALL NOT BE NOTCHED MORE THAN 25% OF WIDTH OF STUD; AT NON- BEARING PARTITIONS NOT MORE THAN 40% OF WIDTH OF STUDS. BORED HOLES MAX. DIAMETER 40% ANY STUD AND 60% NON- BEARING STUD. NO BORED HOLE CLOSER THAN 5/8" TO EDGE OF STUD.

3.16 DECORATIONS USED IN PUBLIC AREAS SHALL BE NON-COMBUSTIBLE OR FLAMEPROOFED IN AN APPROVED MANNER. TITLE 19, ARTICLE 42, M.C. 57.22

3.17 AN ATTIC ACCESS OPENING SHALL BE PROVIDED FOR ATTIC WITH A VERTICAL HEIGHT OF GREATER THAN 30 INCHES. THE OPENING SHALL BE LOCATED IN A CORRIDOR, HALLWAY OR OTHER READILY ACCESSIBLE LOCATION. THE OPENING SHALL NOT BE LESS THAN 22 INCES BY 30 INCHES. 30 INCH MINIMUM CLEAR HEADROOM IN THE ATTIC SPACE SHALL BE PROVIDED AT OR ABOVE THE ACCESS OPENING.

3.18 ROOF DRAINS DISCHARGING WATER WITHIN 25' OF A STREET PROPERTY LINE MUST BE CONDUCTED UNDER SIDEWALK. ALL ROOF DRAINAGE SHALL BE CONDUCTED TO THE STREET BY MEANS OF APPROVED NON-EROSIVE DEVICE.

3.19 OVERFLOW DRAINS AND SCUPPERS ROOFS ENCLOSED BY PARAPET WALLS SHALL BE PROVIDED WITH OVERFLOW SCUPPERS NOT LESS IN AREA THAN 3 TIMES THE SIZE OF THE ROOF DRAINS AND HAVING A MINIMUM OPENING HEIGHT OF 4 INCHES, THE BOTTOM OF THE SCUPPERS SHALL BE NOT MORE THAN 2" ABOVE THE ROOF POINT. ALL ROOF DRAINAGE SHALL CONFORM TO SEC. 1506 CBC

3.20 U OCCUPANCY GARAGE REQUIRES 1-HOUR OCCUPANCY SEPARATION FROM R-3 OCCUPANCY.

5. LIGHTING/ELECTRICAL NOTES:

5.1 THE CONTRACTOR SHALL FURNISH AND INSTALL ALL LIGHTING FIXTURES AND ELECTRICAL WORK AS SHOWN OR IMPLIED ON ALL DRAWINGS AND NOTES.

5.2 THE CONTRACTOR SHALL COORDINATE HIS WORK WITH MANUFACTURER'S SPECIFICATIONS.

5.3 THE WORK SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE

NATIONAL BOARD OF FIRE UNDERWRITERS, PUBLIC UTILITIES COMPANY, TELEPHONE COMPANY AND ALL OTHER AUTHORITIES HAVING JURISDICTION.

5.4 ALL NEW MATERIALS REQUIRED SHALL CONFORM WITH THE STANDARDS OF THE UNDERWRITERS LABORATORIES, INC. IN EVERY CASE WHERE SUCH A STANDARD HAS BEEN ESTABLISHED FOR THE PARTICULAR TYPE OF MATERIAL IN QUESTION, UNLESS OTHERWISE NOTED.

5.5 PROPOSALS SHALL BE BASED UPON FURNISHING AND INSTALLING NEW LIGHTING FIXTURES AND

REMOVING AND REINSTALLING EXISTING LIGHTING FIXTURES (INCLUDING NEW LAMPING) OF TYPES AND MANUFACTURER'S AS INDICATED ON THE "ECUMENA DESIGN STUDIO" REFLECTED CEILING PLANS.

5.6 THE GENERAL AND ELECTRICAL CONTRACTORS SHALL CHECK ALL CEILING HEIGHTS AND CEILING

PLENUM CONDITIONS FOR CLEARANCE OF DUCTWORK, LIGHTING AND OTHER OBSTRUCTIONS TO ASSURE THE FINISHED CEILING HEIGHT SHOWN ON THE "ECUMENA DESIGN STUDIO" DRAWINGS. ANY DISCREPANCY WILL BE BROUGHT TO THIS OFFICE ATTENTION PRIOR TO FINAL BIDDING.

5.7 ALL RECESSED FIXTURES SHALL BE SET FLUSH INTO CEILINGS, UNLESS OTHERWISE NOTED.

5.8 THE ELECTRICAL CONTRACTOR SHALL SUBMIT CUTS OF ALL FIXTURES AS DIRECTED.

5.9 THE ELECTRICAL CONTRACTOR SHALL COORDINATE ANY ELECTRICAL OR LIGHTING INSTALLATION INTO CABINETWORK WITH CABINET CONTRACTOR IF AND AS REQUIRED.

5.10 THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY LIGHTING AND ELECTRICAL SERVICE FOR ALL TRADES AS REQUIRED.

5.11 WHERE MORE THAN ONE SWITCH OCCURS IN THE SAME LOCATION, THEY SHALL BE INSTALLED IN GANG TYPE BOX UNDER ONE COVERPLATE.

5.12 ALL ELECTRICAL, TELEPHONE RECEPTACLES AND LIGHT FIXTURES SHALL BE LOCATED AS DIMENSIONED ON THE "ECUMENA DESIGN STUDIO" PLANS.

5.13 GROUND-FAUILT CIRCUIT-INTERRUPTER PROTECTION COMPLIES WITH NEC ART. 210-8, WHICH READS AS FOLLOWS:

ALL 125-VOLT, SINGLE-PHASE, 15- AND 20- AMPERE RECEPTACLES INSTALLED IN BATHROOMS, GARAGES, BASEMENTS, OUTDOORS, KITCHEN COUNTERS AND AT WET BAR SINKS.

5.14 RECEPTACLE OUTLET LOCATIONS WILL COMPLY WITH NEC ART. 210-52(a).

5.15 CENTER OF RECEPTACLE OUTLETS SHALL NOT BE LESS THAN 12-INCHES ABOVE THE FLOOR OR WORKING AREA.

5.16 CENTER OF THE GRIP OF THE OPERATING HANDLE OF SWITCHES INTENDED TO BE USED BY THE

OCCUPANT OF THE ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS, APPLIANCES, OR COOLING, HEATING AND VENTILATION EQUIPMENT SHALL NOT BE LESS THAN 3 FEET NOR MORE THAN 4 FEET ABOVE THE FLOOR OR WORKING PLATFORM.

5.17 ALL NEW OUTLETS ON COLUMNS WILL BE CENTERED ON FACE SHOWN, UNLESS OTHERWISE NOTED.

5.18 NO "BACK-TO-BACK" OUTLETS ARE PERMITTED WITHIN A WALL. OUTLETS MUST BE STAGGERED IN LOCATION. DIMENSIONS GIVEN ARE TO FIRST SET OF OUTLETS ENCOUNTERED, STAGGER OPPOSITE OUTLET.

5.19 ALL FIRE PREVENTION AND ELECTRICAL WIRING IS TO BE PLACED IN CONDUIT.

5.20 FIRE RATED TEFLON PLENUM CABLES SHALL BE USED FOR TELEPHONE AND ANY LOW-VOLTAGE CIRCUITS NOT IN CONDUIT.

5.21 UNLESS OTHERWISE NOTED, ALL OUTLETS SIDE BY SIDE SHALL BE 6" FROM CENTER OF PLATE WITH POSITIONING DIMENSIONS CENTERED BETWEEN.

5.22 PROVIDE TELEPHONE OUTLETS (WHERE SHOWN ON "ELECTRICAL/ TELEPHONE PLAN") AND ALL NECESSARY CONDUIT RUNS TO TELEPHONE EQUIPMENT AS REQUIRED.

5.23 ALL ELECTRICAL AND TELEPHONE WIRING CONDUIT SHALL BE CONCEALED IN PARTITIONS AND/OR CEILING.

5.24 THE ELECTRICAL AND/OR GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING OF ALL CHASES IN FLOORS, WALLS, AND CEILINGS, AS REQUIRED.

5.25 PROVIDE NEW BLANK COVER PLATES FOR EXISTING OUTLETS NOT BEING USED. COVER PLATES TO MATCH NEW RECEPTACLES, UNLESS OTHERWISE NOTED.

5.26 CONVENIENCE RECEPTACLES SHALL BE AS SPECIFIED BY ELECTRICAL ENGINEER, DUPLEX TYPE RATED 15 AMP., 125 V., GROUNDED, UNLESS NOTED OTHERWISE.

5.27 THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL POWER WIRING.

5.28 THE ELECTRICAL CONTRACTOR WILL COORDINATE HIS WORK WITH THE AIR CONDITIONING ENGINEER AND CONTRACTOR PRIOR TO EXECUTING HIS WORK.

5.29 AS IT RELATES TO THIS SET OF DOCUMENTS A DEDICATED CIRCUIT SHALL BE A SINGLE CIRCUIT WITH MULTIPLE OUTLETS DEDICATED TO A SPECIFIC EQUIPMENT USAGE.

5.30 THE POWER AND SIGNAL PLAN GOVERNS DEVICE LOCATIONS AND THE ELECTRICAL ENGINEER'S DRAWINGS GOVERN THE WIRING LAYOUT AND INSTALLATION. INSTALL IN COMPLIANCE WITH ALL LAWS APPLICABLE AND ENFORCED BY LOCAL AUTHORITIES. WHERE CONFLICTS OCCUR NOTIFY ARCHITECT FOR CLARIFICATION.

5.31 DEVICE LOCATIONS, ELECTRICAL, TELEPHONE/DATA OUTLETS, LIGHT SWITCHES ETC. SHALL BE "CHALKED AND LOCATED" FOR REVIEW BY THE ARCHITECT IN THE FIELD BEFORE PROCEEDING WITH CONSTRUCTION.

6. H.V.A.C. NOTES:

6.1 REFER TO MECHANICAL AND ELECTRICAL CONTRACTOR'S DRAWINGS AND MANUFACTURER'S

TEMPLATE DRAWINGS FOR ALL MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, BOLT SETTING TEMPLATES, ISOLATIONS, SPRING ISOLATION, ETC., NOT SHOWN ON DRAWINGS.

6.2 CONTRACTOR SHALL COORDINATE ALL SLAB AND WALL OPENINGS REQUIRED BY MECHANICAL AND ELECTRICAL DRAWINGS.
*6.3 DUCT PENETRATIONS THROUGH PROTECTIVE ELEMENT OF FIRE RATED CORRIDOR WALLS SHALL BE PROTECTED WITH A FIRE DAMPER PER CBC STANDARD 43-7 AND 43-12.

6.4 ROOF DRAINS DISCHARGING WATER MUST BE CONDUCTED UNDER THE SIDEWALK OR APPROVED LOCATION.

6.5 MECHANICAL VENTILATION IN TOILET ROOM SHALL PROVIDE ONE (1) COMPLETE AIR CHANGE EVERY FIFTEEN (15) MINUTES AND SHALL BE VENTED TO OUTSIDE AIR.

6.6 THE PLUMBING CONTRACTOR SHALL SUBMIT CUTS OF ALL NEW FIXTURES, FITTINGS AND ACCESSORIES TO THE "ECUMENA DESIGN STUDIO" FOR REVIEW AND APPROVAL.

6.7 AUTOMATIC FIRE DAMPERS SHALL BE PROVIDED WHEREVER DUCTS PENETRATE FIRE RATED SHAFT ENCLOSURE OR ANY OTHER WALLS OR CEILING THAT ARE REQUIRED TO BE FIRE RATED.

6.8 THE HVAC ENGINEER WILL PROVIDE NECESSARY ENGINEERING DRAWINGS TO REWORK ALL

EXISTING EQUIPMENT AND TO DETERMINE ALL NEW EQUIPMENT TO MEET THE ABOVE REQUIREMENTS.

6.9 SUBMIT SHOP DRAWINGS INDICATING ALL NEW WORK AND ALL EXISTING EQUIPMENT TO

REMAIN INCLUDING DIFFUSERS, THERMOSTATS AND ANY REQUIRED ACCESS PANELS, TO CITY SPACES, INC.. FOR REVIEW PRIOR TO PROCEEDING WITH FABRICATION AND/OR INSTALLATION OR RELOCATION.

6.10 THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD SUPERVISION OF ALL THEIR

WORK DURING INSTALLATION AND SHALL INSPECT ALL SYSTEMS FOR PROPER OPERATIONS AT COMPLETION OF THE JOB.

6.11 INSTALLATION SHALL BE COORDINATED WITH ALL TRADES AS REQUIRED FOR PROPER ASSEMBLY. CEILING DIFFUSERS TO BE RELOCATED TO MAINTAIN NEW FIXTURE PATTERNS.

6.12 ANY BUILDING SERVICE SHUT DOWNS REQUIRED FOR THIS WORK SHALL BE REQUIRED IN WRITING BY THE HVAC CONTRACTOR AT LEAST 72 HOURS IN ADVANCE THE SHUT DOWN. THE HVAC

CONTRACTOR SHALL OBTAIN APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION PRIOR TO SHUT DOWN. ANY SHUT DOWN AFFECTING THE NORMAL HVAC SERVICE OF OTHER BUILDING OCCUPANTS SHALL BE DONE ON OVERTIME.

6.13 BALANCING OF ENTIRE SYSTEM SHALL BE DONE BY A QUALIFIED ENGINEER. SUBMIT REPORT TO THE "ECUMENA DESIGN STUDIO".

6.14 ALL DUCT WORK SHALL BE INSULATED AS REQUIRED FOR THERMAL AND ACOUSTIC CONSIDERATIONS.

6.15 NO HVAC DUCT WORK OR RELATED EQUIPMENT IS TO BE HUNG FROM THE ROOF DECK.

EQUIPMENT SHALL BE SUSPENDED FROM STRUCTURAL MEMBERS OR SECONDARY FRAMING MEMBERS. MECHANICAL, ELECTRICAL AND PLUMBING SUB- CONTRACTORS SHALL COORDINATE THEIR WORK WITH EACH OTHER AND WITH THE BUILDING FRAMING.

6.16 ALL HABITABLE ROOMS SHALL BE PROVIDED WITH NATURAL LIGHT BY MEANS OF EXTERIOR GLAZED OPENINGS WITH AN AREA NOT LESS THAN 1/8 OF THE FLOOR AREA OF SUCH ROOMS WITH A MINIMUM OF 10 SQ.FT.

6.17 IN BATHROOMS CONTAINING A BATHTUB OR SHOWER OR COMBINATION THEREOF, LAUNDRY

ROOMS, AND SIMILAR ROOMS, A MECHANICAL VENTILATION SYSTEM CONNECTED DIRECTLY TO THE OUTSIDE CAPABLE OF PROVIDING FIVE AIR CHANGES PER HOUR MAY BE PROVIDED. THE POINT OF DISCHARGE OF EXHAUST AIR SHALL BE AT LEAS 3 FEET FROM ANY OPENING INTO THE BUILDING.

6.18 BATHROOMS, WATER CLOSET COMPARTMENTS, LAUNDRY ROOMS AND SIMILAR ROOMS SHALL

BE PROVIDED WITH NATURAL VENTILATION BY MEANS OF OPENABLE EXTERIOR OPENINGS WITH AN AREA NOT LESS THAN 1/20 OF THE FLOOR AREA OF SUCH ROOMS WITH A MINIMUM OF 1 1/2 SQ.FT.

6.19 MECHANICAL VENTILATING SYSTEM CAPABLE OF PROVIDING TWO AIR CHANGES PER HOUR MAY BE PROVIDED. 1/5 OF THE AIR SUPPLY SHALL BE TAKEN FROM THE OUTSIDE.

6.20 UNDER-FLOOR AREAS SHALL BE VENTILATED WITH OPENINGS HAVING A NET AREA OF NOT LESS THAN 1 SQ.FT. FOR EACH 150 SQ.FT. OF AREA, OPENINGS SHALL BE LOCATED AS CLOSE TO CORNERS AS PRACTICAL AND SHALL PROVIDE CROSS VENTILATION. THE OPENINGS SHALL BE

APPROXIMATELY EQUALLY DISTRIBUTED ALONG THE LENGTH OF AT LEAST TWO OPPOSITE SIDES

AND SHALL BE COVERED WITH CORROSION-RESISTANT WIRE MESH WITH MESH OPENINGS OF MAXIMUM 1/4 INCH IN DIMENSION.

6.21 ATTIC AREA SHALL BE VENTILATED WITH OPENINGS HAVING A NET AREA OF NOT LESS THAN 1 SQ.FT. FOR EACH 150 SQ.FT. OF AREA. THE OPENINGS SHALL BE COVERED WITH CORROSION- RESISTANT WIRE MESH WITH MESH OPENINGS OF 1/4 INCH IN DIMENSION.

6.22 WATER HEATER LOCATION. NO WATER HEATER WHICH DEPENDS ON THE COMBUSTION OF A

FUEL FOR HEAT SHALL BE INSTALLED IN ANY ROOM USED OR DESIGNED TO BE USED FOR SLEEPING

PURPOSES, A BATHROOM, A CLOTHES CLOSET, OR IN ANY CONFINED SPACE OPENING INTO A BATHROOM OR SLEEPING ROOM.
*6.23 ANCHORAGE OF WATER HEATERS. ALL WATER HEATERS SHALL BE ANCHORED OR STRAPPED TO PREVENT HORIZONTAL AND VERTICAL DISPLACEMENT DUE TO EARTHQUAKE.

WATER HEATER SHALL BE ADEQUATELY BRACED TO RESIST SEISMIC FORCES. PROVIDE TWO (2) STRAPS. ONE STRAP AT TOP 1/3 OF THE TANK AND ONE STRAP AT BOTTOM 1/3 OF THE TANK. CPC.

SECTION 510.5
*6.24 THE FAU CLOSET OR ALCOVE MUST BE 12 INCHES WIDER THAN THE FURNACE OR FURNACES BEING INSTALLED. CMC SECTION 304.7

6.25 A FUEL BURNING FURNACE (OR ANY FUEL BURNING EQUIPMENT) SHALL NOT BE INSTALLED IN

A CLOSET, BATHROOM OR A ROOM READILY USABLE AS A BEDROOM, OR IN A ROOM, COMPARTMENT OR ALCOVE OPENING.
*6.26 PASSAGEWAY TO THE ATTIC FURNACE SHALL BE UNOBSTRUCTED NOT LESS THAN 30" HIGH AND 30" WIDE AND HAVE CONTINUOUS SOLID FLOORING NOT LESS THAN 24 INCHES WIDE, NOT MORE THAN 20 FEET IN LENGTH THROUGH THE ATTIC. SECTION 307.3.2, CMC.

1. FIRE/LIFE SAFETY:
*1.1 PROVIDE AN APPROVED FIRE ALARM SYSTEM, WITH DESCRIPTION OF SEQUENCE OF OPERATION AND LISTED STATE FIRE MARSHAL APPROVED EQUIPMENT. *1.2 FIRE DEPARTMENT ACCESS, FIRE HYDRANTS, AND FIRE FLOW REQUIREMENTS ON THIS PROJECT SHALL BE REVIEWED BY THE HYDRANT UNIT, _______ CITY, _____________ ADDRESS, ____________ TEL.

1.3 SPRINKLER SYSTEM MUST BE APPROVED BY PLUMBING DIVISION PRIOR TO INSTALLATION.

1.4 ALL INTERIOR WALLS AND CEILING FINISHES SHALL BARE THE FOLLOWING MAXIMUM FLAME SPREAD CLASSIFICATION FOR FINISH MATERIALS, AS REQUIRED BY CHAPTER 8 C.B.C.:
a) ENCLOSED VERTICAL - CLASS I
b) OTHER EXITWAYS - CLASS II
c) ROOMS OR AREAS - CLASS III

1.5 BUILDING NUMBER OR ADDRESS SHALL BE EASILY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. LOCATE AS DIRECTED BY THE FIRE INSPECTOR. NUMBERS SHALL BE 8" HELVETICA FOAM CORE PAINTED IN THE CONTRASTING COLOR.

1.6 DRAFTSTOPPING MATERIALS SHALL BE NOT LESS THAN 1/2 INCH GYPSUM BOARD, 3/8 INCH PLYWOOD, 3/8 INCH TYPE 2-M PARTICLE BOARD OR OTHER APPROVED MATERIALS ADEQUATELY SUPPORTED. PROVIDE A COMPLETE SEAL THE ENTIRE FULL HEIGHT OF THE SPACE. *1.7 ALL PENETRATIONS OF FIRE RATED WALLS SUCH AS FOR HVAC DUCTS, ELECTRICAL, PLUMBING, etc..., SHALL BE TREATED WITH A FIRE STOPS SEALANT MEETING THE PROVISION OF SEC. 709.6 OF THE C.B.C. HAVING F OR T RATINGS AS DE TERMINED BY TEST CONDUCTED IN ACCORDANCE WITH I.B.C. STANDARD NO.7-1, STANDARD METHOD E 814 OF THE ASTM OR UL 1479.

ALL PRODUCTS USED SHALL HAVE I.C.B.O. NUMBER APPROVAL.

1.8 FIRE DEPARTMENT ACCESS ROADWAY TO COMPLY WITH F.P.B. POLICY A-85-3, AND 10.207 U.F.C.

1.9 CURB MARKIGS. NO PARKING SIGNS AND PAINTED CURBS TO BE PROVIDED AS DIRECTED BY THE FIRE INSPECTOR.
*1.10 ROOF COVERING SHALL BE FIRE RETARDANT (CHAPTER 15 C.B.C.)

1.11 ROOF: USE CLASS "A" OR "B". WHERE UNDERLAYS ARE ATTACHED TO THE ROOF BY STRIP OR SPOT BONDING, A MINIMUM OF 1 LAYER 3/8" PLYWOOD; WHERE UNDERLAYS ARE ATTACHED TO THE ROOF BY NAILING AT POINTS NOT MORE THAN 12" APART IN ANY DIRECTION, A MINIMUM OF 1 LAYER 1" NOMINAL SHEATHING OR 1/2" PLYWOOD SURFACED WITH A FIRE-RETARDANT ROOFING OF 3 LAYERS 15# FELT BONDED TOGETHER WITH MINIMUM 40# BITUMNIOUS BONDING AGENT WITH 250# GRAVEL PER 100 S.F. UNLESS SPECIFIED OTHERWISE ON PLANS. SEE ALSO STRUCTURAL DRAWINGS AND REQUIREMENTS OF CHAPTER 16, C.B.C.

1.12 TOP OF CHIMNEY MUST EXTEND MINIMUM 24 INCHES ABOVE ANY ROOF WITHIN 10 FEET.

PROVIDE APPROVED SPARK ARRESTOR AS PER MANUFACTURER SPEC'S.

1.14 ROOF OBSTRUCTIONS SUCH AS TELEVISION ANTENNA, GUY WIRES, SOLAR PANELS, RAZOR

RIBBON, FENCE, CABLE, OR OTHER OBSTRUCTIONS SHALL NOT PREVENT FIRE DEPARTMENT ACCESS OR EGRESS IN THE EVENT OF A FIRE.

1.15 SMOKE DETECTORS SHALL BE PROVIDED AS FOLLOWS:
a) IN NEW CONSTRUCTION SMOKE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER SOURCE

FROM THE BUILDING WIRING AND SHALL BE EQUIPPED WITH BATTERY BACK UP AND LOW BATTERY SIGNAL. SMOKE DETECTORS SHALL BE LOCATED IN EACH SLEEPING ROOM HALLWAY OR

AREA GIVING ACCESS TO A SLEEPING ROOM, AND ON EACH STORY AND BASEMENT FOR DWELLINGS WITH MORE THAN ONE STORY.
b) IN EXISTING CONSTRUCTION SMOKE DETECTORS MAY BE BATTERY OPERATED, INSTALLED IN LOCATION AS SPECIFIED.

4. SECURITY PROVISION NOTES:
- ALL OPENINGS NOTED WITH SYMBOL ARE SECURITY OPENINGS AND THE FOLLOWING NOTES SHALL APPLY:
- ALL OPENINGS IN AN EXTERIOR WALL AND LESS THAN 16 FT. ABOVE ANY ADJOINING GRADE

ACCESSIBLE TO THE PUBLIC OR OTHER TENANT, AND OPENINGS IN ENCLOSING PARTITIONS OF A

DWELLING UNIT, PRIVATE GARAGE, GUESTROOM OR SINGLE TENANT NON-RESIDENTIAL AREA ARE SECURITY OPENINGS.

4.1 ALL ENTRY DOORS TO DWELLING UNITS OR GUEST ROOMS SHALL BE ARRANGED SO THAT THE

OCCUPANT HAS A VIEW OF THE AREA IMMEDIATELY OUTSIDE THE DOOR WITHOUT OPENING THE DOOR. SUCH VIEW MAY BE PROVIDED BY A DOOR VIEWER, THROUGH WINDOWS LOCATED IN THE VICINITY OF THE DOOR OR THROUGH VIEW PORTS IN THE DOOR OR ADJOINING WALL. 6706.

4.2 SCREENS, BARRICADES OR FENCES MADE OF MATERIAL WHICH PRECLUDE HUMAN CLIMBING

SHALL BE PROVIDED AT EVERY PORTION OF EVERY ROOF, BALCONY, OR SIMILAR SURFACE WHICH IS WITHIN 8 FT. OF THE UTILITY POLE OR SIMILAR STRUCTURE. 6707

4.3 WOOD FLUSH-TYPE DOORS SHALL BE 1 3/8" THICK MINIMUM WITH SOLID CORE CONSTRUCTION. 6709.1. - DOOR STOPS OF IN-SWINGING DOORS SHALL BE ONE-PIECE CONSTRUCTION WITH THE JAMB OR JOINED BY RABBET TO THE JAMB. 6709.4

4.4 OPENINGS FROM A PRIVATE GARAGE DIRECTLY INTO A ROOM USED FOR SLEEPING PURPOSES ARE NOT PERMITTED (R302.5.1).

4.5 DOORS BETWEEN GARAGE AND THE DWELLING UNIT SHALL HAVE A MINIMUM FIRE PROTECTION RATING OF 20 MINUTES AND SELF-CLOSING AND SELF-LATCHING DEVICES, OR SOLID WOOD OR SOLID OR HONEYCOMB CORE STEEL NOT LESS THAN 1 3/8 INCHES THICK. (R302.5.1)

4.6 SLIDING DOORS SHALL BE PROVIDED WITH A DEVICE IN THE UPPER CHANNEL OF THE MOVING

PANEL TO PROHIBIT RAISING AND REMOVING OF THE MOVING PANEL IN THE CLOSED OR PARTIALLY OPEN POSITION. 6710

4.7 SLIDING GLASS DOORS SHALL BE EQUIPPED WITH LOCKING DEVICES AND SHALL BE SO

CONSTRUCTED AND INSTALLED THAT THEY REMAIN INTACT AND ENGAGED WHEN SUBJECTED TO THE TESTS SPECIFIED IN SEC. 6717.1

4.8 METAL OR WOODEN OVERHEAD OR SLIDING DOORS SHALL BE SECURED WITH A CYLINDER LOCK, PADLOCK WITH A MIN. 9/32 IN. DIAMETER HARDENED STEEL SHACKLE AND BOLTED,

HARDENED STEEL HASPS, METAL SLIDE BOARD, BOLT OR EQUIVALENT DEVICE UNLESS SECURED ELECTRICALLY OPERATED. 6711

2.9 STAIRS:
a) MAXIMUM RISER = 7" (7.75" -WITHIN INDIVIDUAL UNITS)
b) MINIMUM TREAD = 11" (10" -WITHIN INDIVIDUAL UNITS)
c) MINIMUM HEADROOM = 6'8"
d) HANDRAILS = 34"-38" HIGH

2.10 HANDGRIP PORTION OF HANDRAIL SHALL BE NOT LESS THAN 1 1/2" INCHES NOR MORE THAN 2 INCHES IN CROSS SECTIONAL DIMENSION.

2.11 ENCLOSED USABLE SPACE UNDER INTERIOR STAIRS REQUIRES 1-HR FIRE RESISTIVE CONSTRUCTION ON ENCLOSED SIDE.

2.12 STAIRWAY LANDING:
a) LANDING DIMENSION IN THE DIRECTION OF TRAVEL MUST EQUAL THE WIDTH OF THE STAIRS.
b) SWINGING DOORS SHALL NOT REDUCE REQUIRED LANDING WIDTH TO LESS THAN ONE- HALF. c) WHEN DOOR OPENS OVER LANDING THE LANDING SHALL HAVE A LENGTH OF NOT LESS THAN 5 FT.
d) MAXIMUM VERTICAL DISTANCE BETWEEN LANDINGS IS 12 FEET.

2.13 PROVIDE 42" GUARDRAIL. MAXIMUM CLEARANCE BETWEEN INTERMEDIATE RAIL IS 4".

2.14 PROVIDE 42" HIGH MINIMUM PROTECTIVE GUARDRAIL FOR DECKS, PORCHES, BALCONIES, LANDINGS AND RAISED FLOORS, WHEN MORE THAN 30 INCHES ABOVE GRADE OR FLOOR BELOW, AND OPEN SIDE(S) OF STAIR LANDING. OPENING BETWEEN BALUSTERS/ RAILS SHALL PRECLUDE PASSAGE OF 4 INCH DIAMETER SPHERE.

4.9 PROVIDE METAL GUIDES AT TOP AND BOTTOM OF METAL ACCORDION GRATE OR GRILLE-TYPE DOORS AND CYLINDER LOCKS OR PADLOCKS. CYLINDER GUARDS SHALL BE INSTALLED ON ALL

CYLINDER LOCKS WHENEVER THE CYLINDER PROJECTS BEYOND THE FACE OF THE DOOR OR IS OTHERWISE ACCESSIBLE TO GRIPPING TOOLS. 6712

4.10 GLAZED OPENINGS WITHIN 40" OF THE DOOR LOCK WHEN THE DOOR IS IN THE CLOSED

POSITION, SHALL BE FULLY TEMPERED GLASS OR APPROVED BURGLARY RESISTANT MATERIAL, OR SHALL BE PROTECTED BY METAL BARS, SCREENS OR GRILLS HAVING A MAXIMUM OPENING OF 2 INCHES. THE PROVISIONS OF THIS SECTION SHALL NOT APPLY TO VIEW PORTS OR WINDOWS WHICH DO NOT EXCEED 2 INCHES IN THEIR GREATEST DIMENSIONS. 6713

4.11 LOUVERED WINDOWS SHALL BE PROTECTED BY METAL BARS OR GRILLES WHICH ARE CONSTRUCTED TO PRECLUDE HUMAN ENTRY. SUCH BARS OR GRILLES SHALL HAVE A PATTERN SUCH THAT NO LESS THAN ONE DIMENSION OF ANY OPENING SHALL BE 6 IN. OR LESS. 6715.3

4.12 SLIDING WINDOWS SHALL BE PROVIDED WITH A DEVICE IN THE UPPER CHANNEL OF THE

MOVING PANEL TO PROHIBIT RAISING AND REMOVING OF THE MOVING PANEL IN THE CLOSED OR PARTIALLY OPEN POSITION. 6715.1.

4.13 SLIDING WINDOWS SHALL BE EQUIPPED WITH LOCKING DEVICES AND SHALL BE SO

CONSTRUCTED AND INSTALLED THAT THEY REMAIN INTACT AND ENGAGED WHEN SUBJECTED TO THE TEST SPECIFIED IN 6717.2

4.14 ANY RELEASE FOR METAL BARS, GRILLS, GRATES OR SIMILAR DEVICES CONSTRUCTED TO

PRECLUDE HUMAN ENTRY THAT ARE INSTALLED SHALL BE LOCATED ON THE INSIDE OF THE ADJACENT ROOM AND AT LEAST 24 INCHES FROM THE CLOSEST OPENING THROUGH SUCH METAL BARS, GRILLS, GRATES OR SIMILAR DEVICES THAT EXCEEDS TWO INCHES IN ANY DIMENSION. 6715.4

4.15 AL OTHER OPENINGS MUST BE PROTECTED BY METAL BARS OR GRILLES WITH OPENINGS OF NOT LESS THAN 6 IN. IN ONE DIMENSION. 6716

4.16 SINGLE SWINGING DOORS DEADBOLTS WITH HARDENED INSERTS TO BE SPECIFIED; DEADLOCKING LATCH WITH KEY-OPERATED LOCKS ON EXTERIOR; LOCKS MUST BE OPENABLE FROM INSIDE WITHOUT KEY, SPECIAL KNOWLEDGE OR SPECIAL EFFORT. 6709.2

5.32 TYPICAL HEIGHTS OF ELECTRICAL OUTLETS AND DEVICES ARE AS INDICATED:
a) LOCATE CENTERLINE OF THERMOSTATS, PULL BOXES AND CONTROL DEVICES AT +42" ABOVE FINISH FLOOR.
b) LOCATE SWITCHES/DIMMERS AT +42" ABOVE FINISHED FLOOR. GANG WITH OTHER OUTLETS WHERE ADJACENT. PROVIDE A SINGLE PIECE COVERPLATE WHERE SWITCHES/DIMMERS ARE GANGED TOGETHER.
c) LOCATE CENTERLINE OF ALL WALL MOUNTED ELECTRICAL, TELEPHONE AND DATA OUTLETS AT +15" ABOVE FINISH FLOOR IN VERTICAL POSITION, UNLESS NOTED OTHERWISE. d) ELECTRICAL, TELEPHONE, AND DATA OUTLETS MOUNTED AT A HEIGHT OF +30" ABOVE FINISH

FLOOR OR MORE, ARE TO BE INSTALLED HORIZONTALLY TO CENTERLINE OF DIMENSION INDICATED.

5.33 ALL EXPOSED ELECTRICAL DEVICES, I.E. SWITCHES, OUTLETS, WALL TELEPHONE MOUNTS, ETC. AND ALL COVERPLATES TO BE WHITE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:14:17 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

GENERAL NOTES
G003
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
EXHIBIT 3
194 of 348

7. SAFETY GLAZING IN HAZARDOUS AREAS:

THE FOLLOWING SHALL BE CONSIDERED SPECIFIC HAZARDOUS LOCATIONS FOR THE PURPOSED OF SAFETY GLAZING SECTION 2406,
GLAZING IN:
a. SWING DOORS EXCEPT JALOUSIES.
b. FIXED AND SLIDING PANELS OF SLIDING DOOR ASSEMBLIES AND PANELS IN SLIDING AND BI- FOLD CLOSET DOOR ASSEMBLIES. c. STORM DOORS.
d. UNFRAMED SWINGING DOORS.
e. DOORS AND ENCLOSURES FOR HOT TUBS, WHIRLPOOLS, SAUNAS, STEAM ROOMS, BATHTUBS, AND SHOWERS.
f.FIXED OR OPERABLE PANELS ADJACENT TO A DOOR WHERE THE NEAREST EXPOSED EDGE OF THE GLAZING IS WITHIN 24 INCHES (610 MM) ARC OF EITHER VERTICAL EDGE OF THE DOOR IN A CLOSED POSITION AND WHERE THE BOTTOM EXPOSED EDGE OF THE GLAZING IS LESS THAN 60 INCHES (1525 MM) ABOVE THE WALKING SURFACE. READ CODE FOR EXCEPTIONS. g. FIXED OR OPERABLE PANEL, OTHER THAN DESCRIBED IN ITEMS E AND F, WHICH MEETS ALL OF THE FOLLOWING CONDITIONS (READ CODE FOR EXCEPTION WITH SPECIAL INSTALLATION). i. EXPOSED AREA OF AN INDIVIDUAL PANE GREATER THAN 9 SQUARE FEET (0.84 RN) ii. EXPOSED BOTTOM EDGE LESS THAN 18 INCHES (457 MM) ABOVE THE FLOOR. iii. EXPOSED TOP EDGE GREATER THAN 36 INCHES (914 MM) ABOVE THE FLOOR. iv. ONE OR MORE WALKING SURFACES WITHIN 36 INCHES (914 MM) HORIZONTALLY OF THE PLANE OF THE GLAZING.
h. GUARDS AND RAILINGS REGARDLESS OF AREA OR HEIGHT ABOVE A WALKING SURFACE.

INCLUDED ARE STRUCTURAL BALUSTER PANELS AND NON STRUCTURAL IN-FILL PANELS. i. WALLS AND FENCES ENCLOSING INDOOR AND OUTDOOR SWIMMING POOLS AND SPAS WHERE ALL OF THE FOLLOWING CONDITIONS ARE PRESENT:
i. THE BOTTOM EDGE OF THE GLAZING IS LESS THAN 60 INCHES (1525 MM) ABOVE A WALKING SURFACE ON THE POOL OR SPA SIDE OF THE GLAZING.
ii. THE GLAZING IS WITHIN 60 INCHES (1525 MM) OF A SWIMMING POOL OR SPA WATER'S EDGE. j. ADJACENT TO STAIRWAYS, LANDINGS AND RAMPS WITHIN 36 INCHES HORIZONTALLY OF A WALKING SURFACE; WHEN THE EXPOSED SURFACE OF THE GLASS IS LESS THAN 60 INCHES

ABOVE THE PLANE OF THE ADJACENT WALKING SURFACE(READ CODE FOR EXCEPTION WITH SPECIAL INSTALLATION).
k. ADJACENT TO STAIRWAYS WITHIN 60 INCHES HORIZONTALLY OF THE BOTTOM TREAD OF A STAIRWAY IN ANY DIRECTION WHEN THE EXPOSED SURFACE OF THE GLASS IS LESS THAN 60

INCHES ABOVE THE NOSE OF THE TREAD (READ CODE FOR EXCEPTION WITH SPECIAL INSTALLATION ).

GLAZING IN THE FOLLOWING LOCATIONS SHALL BE SAFETY GLAZING CONFORMING TO THE HUMAN

IMPACT LOADS OF
SECTION R308.3 (SEE EXCEPTIONS) (R308.4):
a. FIXED AND OPERABLE PANELS OF SWINGING, SLIDING AND BI-FOLD DOOR ASSEMBLIES. b. GLAZING IN AN INDIVIDUAL FIXED OR OPERABLE PANEL ADJACENT TO A DOOR WHERE THE NEAREST VERTICAL EDGE IS WITHIN A 24-INCH ARC OF EITHER VERTICAL EDGE OF THE DOOR IN A CLOSED POSITION AND WHOSE BOTTOM EDGE IS LESS THAN 60 INCHES ABOVE THE FLOOR OR

WALKING
SURFACE.
c. GLAZING IN AN INDIVIDUAL FIXED OR OPERABLE PANEL THAT MEETS ALL OF THE FOLLOWING CONDITIONS:
iii. EXPOSED AREA OF AN INDIVIDUAL PANE GREATER THAN 9 SQUARE FEET. iv. BOTTOM EDGE LESS THAN 18 INCHES ABOVE THE FLOOR.
v. TOP EDGE GREATER THAN 36 INCHES ABOVE THE FLOOR.
vi. ONE OR MORE WALKING SURFACES WITHIN 36 INCHES HORIZONTALLY OF THE GLAZING.

GLAZING IN GUARDS AND RAILINGS.
e. GLAZING IN ENCLOSURES FOR OR WALLS FACING HOT TUBS, WHIRLPOOLS, SAUNAS, STEAM ROOMS, BATHTUBS AND SHOWERS WHERE THE BOTTOM EDGE OF THE GLAZING IS LESS THAN 60 INCHES MEASURED VERTICALLY ABOVE ANY STANDING OR WALKING SURFACE. f.GLAZING IN WALLS AND FENCES ADJACENT TO INDOOR AND OUTDOOR SWIMMING POOLS, HOT TUBS AND SPAS WHERE THE BOTTOM EDGE OF THE GLAZING IS LESS THAN 60 INCHES ABOVE A WALKING SURFACE AND WITHIN 60 INCHES,
MEASURED HORIZONTALLY AND IN A STRAIGHT LINE, OF THE WATER’S EDGE. g. GLAZING WHERE THE BOTTOM EXPOSED EDGE OF THE GLAZING IS LESS THAN 36 INCHES ABOVE

THE PLANE OF THE ADJACENT WALKING SURFACE OF STAIRWAYS, LANDINGS BETWEEN FLIGHTS

OF STAIRS
AND RAMPS.
h. GLAZING ADJACENT TO THE LANDING AT THE BOTTOM OF A STAIRWAY WHERE THE GLAZING IS LESS THAN 36 INCHES ABOVE THE LANDING AND WITHIN A 60 INCH HORIZONTAL ARC LESS THAN 180 DEGREES FROM THE BOTTOM TREAD NOSING (R304.2)
VERY HIGH HAZARD SEVERITY FIRE ZONE:

A. CLASS A ROOF COVERING IS REQUIRED FOR ALL BUILDINGS. WOOD SHAKES AND SHINGLES ARE NOT PERMITTED. (7207.4, 1505)
B. VALLEY FLASHINGS SHALL BE NOT LESS THAN 0.019-INCH (0.48 MM) (NO. 26 GALVANIZED SHEET GAGE) CORROSION-RESISTANT METAL INSTALLED OVER A MINIMUM 36-INCH-WIDE (914MM) UNDERLAYMENT CONSISTING OF ONE LAYER OF NO. 72 ASTM CAP SHEET RUNNING THE FULL LENGTH OF THE VALLEY (705A.3)
C. ROOF GUTTERS SHALL BE PROVIDED WITH THE MEANS TO PREVENT THE ACCUMULATION OF LEAVES AND DEBRIS IN THE GUTTER (705A.4)
D. (ROOF) (ATTIC)(EXTERIOR WALL) VENTS SHALL RESIST THE INTRUSION OF FLAME AND EMBERS

INTO THE ATTIC AREA OF THE STRUCTURE, OR SHALL BE PROTECTED BY CORROSION-RESISTANT, NONCOMBUSTIBLE WIRE MESH WITH 1/4 –INCH (6 MM) OPENINGS OR ITS EQUIVALENT. VENTS SHALL NOT BE INSTALLED IN EAVES AND CORNICES (706A.1, 706A.2, 706A.3, 7207.3) E. EAVES AND SOFFITS SHALL MEET THE REQUIREMENTS OF SFM 12-7A-3 OR SHALL BE

PROTECTED BY IGNITION-RESISTANT MATERIALS OR NONCOMBUSTIBLE CONSTRUCTION ON THE EXPOSED UNDERSIDE (707A.5.5)
F. EXTERIOR WALLS SHALL BE APPROVED NONCOMBUSTIBLE OR IGNITION-RESISTANT MATERIAL,

HEAVY TIMBER, OR LOG WALL CONSTRUCTION OR SHALL PROVIDE PROTECTION FROM THE INTRUSION OF FLAMES AND EMBERS IN ACCORDANCE WITH STANDARD SFM 12-7A-1 (704A.3) G. EXTERIOR WALL COVERINGS SHALL EXTEND FROM THE TOP OF FOUNDATION TO THE ROOF, AND TERMINATE AT 2-INCH (50.8 MM) NOMINAL SOLID WOOD BLOCKING BETWEEN RAFTERS AT ALL

ROOF OVERHANGS, OR IN THE CASE OF ENCLOSED EAVES, TERMINATE AT THE ENCLOSURE (704A.3.1)
H. EXTERIOR WINDOWS, WINDOW WALLS, GLAZE DOORS, AND GLAZED OPENINGS WITHIN

EXTERIOR DOORS SHALL BE INSULATING- GLASS UNITS WITH A MINIMUM OF ONE TEMPERED PANE, OR GLASS BLOCK UNITS, OR HAVE A FIRE RESISTANCE RATING OF NOT LESS THAN 20 MINUTES, WHEN
TESTED ACCORDING TO ASTM E 2010, OR CONFORM TO THE PERFORMANCE REQUIREMENTS OF SFM 12-7A-2 (708A.2.1)
I. EXTERIOR DOOR ASSEMBLIES SHALL CONFORM TO THE PERFORMANCE REQUIREMENTS OF STANDARD SFM 12-7A-1 OR SHALL BE APPROVED NONCOMBUSTIBLE CONSTRUCTION, OR SOLID CORE WOOD HAVING STILES AND RAILS NOT LESS THAN 1 3/8 INCHES THICK WITH INTERIOR FIELD PANEL THICKNESS NO LESS THAN 1 ¼ INCHES THICK, OR SHALL HAVE A FIRE-RESISTANCE RATING OF NOT LESS THAN 20 MINUTES WHEN TESTED ACCORDING TO ASTM E 2074. (EXCEPTION:

NONCOMBUSTIBLE OR EXTERIOR FIRE-RETARDANT TREATED WOOD VEHICLE ACCESS DOORS) (708A.3)
J. DECKING, SURFACES, STAIR TREADS, RISERS, AND LANDINGS OF DECKS, PORCHES, AND BALCONIES WHERE ANY PORTION OF SUCH SURFACE IS WITHIN 10 FEET (3048 MM) OF THE

PRIMARY STRUCTURE SHALL BE CONSTRUCTED OF HEAVY TIMBER, NON COMBUSTIBLE OR OTHER APPROVED MATERIALS PER SEC.709A.3
K. THE UNDERSIDE OF CANTILEVERED AND OVERHANGING APPENDAGES AND FLOOR

PROJECTIONS SHALL MAINTAIN THE IGNITION- RESISTANT INTEGRITY OF EXTERIOR WALLS, OR THE PROJECTION SHALL BE ENCLOSED TO THE GRADE (707A.8)
L. BUILDINGS SHALL HAVE ALL UNDERFLOOR AREAS COMPLETELY ENCLOSED TO THE GRADE WITH CONSTRUCTION AS REQUIRED FOR EXTERIOR WALLS (707A.8, 7207.1) M. ALL UTILITIES, PIPES, FURNANCES, WATER HEATERS OR OTHER MECHANICAL DEVICES

LOCATED IN AN EXPOSED UNDER-FLOOR AREA OF A RESIDENTIAL BUILDING SHALL BE ENCLOSED WITH MATERIALS AS REQUIRED FOR 1-HOUR FIRE-RESISTIVE CONSTRUCTION.(7207.2) N. THE SPACE BETWEEN THE ROOF COVERING AND ROOF DECKING SHALL BE CONSTRUCTED TO PREVENT THE INTRUSION OF FLAMES AND EMBERS AND BE FIRE STOPPED PER 705A.2.

O. NO TRELLIS IS PERMITTED WITHIN 10 FEET OF THE PRIMARY STRUCTURE.

P. TRELLIS MORE THAN 10 FEET FROM THE PRIMARY STRUCTURE SHALL BE CONSTRUCTED OF HEAVY TIMBER OR NON COMBUSTIBLE MATERIALS. MINIMUM OF 4 INCHES SPACING IS REQUIRED BETWEEN THE MEMBERS. (INFORMATION BULLETIN NO. P/BC 2008-023).

8. MISCELLANEOUS NOTES:

8.1 SEISMIC GAS SHUTOFF VALVE WILL BE INSTALLED ON THE FUEL GAS LINE ON THE DOWN

STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING. PROVIDE A METAL LABEL FOR GAS SHUTOFF VALVE, FOR ALL ASSEMBLY OCCUPANCIES.

8.2 THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED

ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES (POWER POLES, PULL-BOXES, TRANSFORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.) OR TO THE LOCATION OF THE HOOK-UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY POWER LINES-WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY. FAILURE TO COMPLY MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL EXPENSES.

8.3 PROVIDE AN ALARM FOR DOORS TO THE DWELLING THAT FORM A PART OF THE POOL ENCLOSURE. THE ALARM SHALL SOUND CONTINUOUSLY FOR A MIN. 30 SECONDS WHEN THE DOOR IS OPENED. IT SHALL AUTOMATICALLY RESET AND BE EQUIPPED WITH A MANUAL MEANS TO DEACTIVATE (FOR 15 SECS. MAX.) FOR A SINGLE OPENING. THE DEACTIVATION SWITCH SHALL BE AT LEAST 54" ABOVE THE FLOOR.

8.4 DAMPPROOFING, WHERE REQUIRED, SHALL BE INSTALLED WITH MATERIALS AND AS REQUIRED IN SECTION R406.1.

8.5 PROTECTION OF WOOD AND WOOD BASED PRODUCTS FROM DECAY SHALL BE PROVIDED IN THE LOCATIONS SPECIFIED PER SECTION R317.1 BY THE USE OF NATURALLY DURABLE WOOD OR WOOD THAT IS PRESERVATIVE-TREATED IN ACCORDANCE WITH AWPA U1 FOR THE SPECIES, PRODUCT, PRESERVATIVE AND END USE. PRESERVATIVES SHALL BE LISTED IN SECTION 4 OF AWPA U1.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:14:32 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

GENERAL NOTES
G004
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
EXHIBIT 3
195 of 348
N80°14'49"E 117.52'
N09°24'59"W 136.13'
N09°25'47"E
1 14.86'
(1096')
(1112')
(1110')
(110
8')
(1
11 0')
(1112')
(1
1 08')
(1114')
(1094')
(E) WALKWAY
(E)

LANDSCAPE
(E) CONC. SLAB
(E) DRIVEWAY
APRON
(E) NON-PROTECTED TREE
(E) STONE WALL
(E) LANDSCAPE
ROOFED
PATIO
78 SF
PROPERTY LINE N80°14'49"E 117.52'
(E) SIDEWALK
WHITEHAVEN TERR.
(E) DRIVEWAY
L= 45.20 R=35.00
D=073°59'46"
L= 33.69 R=35.00
D=073°59'46" N80°35'01"E 11.67'
PROPERTY LINE N09°24'59"W 136.13'

PROPERTY
LINE
N09°25'47"E
1 14.86'

PROPERTY LINE
(E) POOL
(E) FIREPIT

BRICK PILLARS

ADJACENT

BUILDING
(E)

LANDSCAPE
(E) LANDSCAPE
(E) NON-PROTECTED TREE

ADJACENT

BUILDING
W
E
G
W

COVERED
ENTRY
154 SF
(E) SINGLE FAMILY RESIDENCE
906 WHITEHAVEN TER.

SINGLE STORY TYPE V STRUCTURE
W/ 3-CAR ATTACHED GARAGE
2e 3e 6e 9e
Ae
Be
Fe
Ge
He
1 2
0 4 8 16
1/8"=1'-0"
(E) SETBACK, V.I.F.
9' - 1 1/4"
3'-4" 7'-5" 34'-0" 13'-5"
58'-2"
10'-6" 22'-6" 25'-7"
58'-7"
F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.F.O. FIN.F.O. FIN.F.O. FIN.
(E) BUILDING PAD
6"

EXTENT OF EXISTING

BUILDING PAD
(E) FRONT SETBACK (V.I.F.)
32'-11"
(E) FRONT SETBACK (V.I.F.)
15'-9"
(E) DRIVEWAY DEPTH
28'-5 1/4"
(E) SIDE SETBACK (V.I.F.)
18'-7 3/4"
(E) REAR SETBACK (V.I.F.)
44'-4 1/2"
(E) CONC. SLAB
(E) CONC. SLAB
(E) CONC. FOOTPATH
(TYP)
= PROPERTY LINE
(N) = NEW CONSTRUCTION
(E) = EXISTING STRUCTURE
= NEW FIRST FLOOR AREA
3' - 0"
6' - 8"
3' - 0"
6' - 8"
= (E) WINDOW TAG
WIDTH
HEIGHT
= (E) DOOR TAG
WIDTH
HEIGHT
= SETBACK LINE
= EXISTING FLOOR AREA
= NEW SECOND FLOOR AREA
VIF = VERIFY IN FIELD
P.U.E. = PUBLIC UTILITY EASEMENT
= REINFORCED CONCRETE
PIPE
RCP
W = WATER METER
E = ELECTRICAL METER
G = GAS METER
= COVERED AREA
= ADJACENT PROPERTIES
= LANDSCAPE AREA
= NEW SECOND FLOOR WINDOWS
1/8" = 1'-0" 1 EXISTING SITE PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:14:55 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

EXISTING SITE PLAN
A050
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE

SITE PLAN LEGEND

SITE PLAN NOTES

1. THERE ARE NO OAKS, BAY, OR SYCAMORE TREES (PROTECTED TREES) ON THE SITE OR WITHIN 20 FEET OF THE SITE.

2. NO ROOFTOP EQUIPMENT SHALL BE PERMITTED IN THE ROS, R1R AND R1 ZONES

3. RETAINING WALLS, POOLS, SPAS, JACUZZIS, FENCES, AND PATIO COVERS REQUIRE A SEPARATE PERMIT.

4. APPROVED ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION

SHALL BE PLACED IN A POSITION THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET, ROAD, ALLEY, AND WALKWAYS GIVING ACCESS TO AND WITHIN THE PROPERTY. THESE NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDRESS NUMBERS SHALL BE ARABIC NUMERALS OR ALPHABET LETTERS. NUMBERS SHALL BE A MINIMUM OF 4 INCHES HIGH WITH A MINIMUM STROKE WIDTH OF 0.5 INCH AND SHALL BE ILLUMINATED IN AN APPROVED MANNER (IF NUMBERS ARE ON THE EXTERIOR). NUMBER HEIGHT AND STROKE WIDTH SHALL BE INCREASED AS NEEDED FOR LEGIBILITY BASED ON VISIBILITY DISTANCE.

5. SHALL PROVIDE RAIN GUTTERS AND CONVEY RAIN WATER TO THE STREET.

6. NO ROOFTOP EQUIPMENT SHALL BE VISIBLE FROM THE STREET. ANY NEW ROOFTOP EQUIPMENT SHALL BE SCREENED FROM VIEW.

7. THERE SHALL BE NO EXTENSIVE GRADING (CUT&FILL) BEYOND TYPICAL FOOTING EXCAVATION.

8. SEE TOPOGRAPHIC SURVEY ON SHEET A102 FOR FURTHER INFORMATION.

9. CONTRACTOR TO VERIFY IN FIELD ALL EXISTING DIMENSIONS AND IMMEDIATELY NOTIFY THE ARCHITECT OF RECORD OF ANY DISCREPANCIES.

EXHIBIT 3
196 of 348
1 2
0 4 8 16
1/8"=1'-0"
LIVING

BED LAUNDRY
3 CAR GARAGE
BED
BATH
CLOSET

PRIMARY BATH

PRIMARY BED
DINING

KITCHEN

HALLWAY
CLST
CLST
CLST
CLST
5'-0"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
2'-10"
6'-8"
5'-8"
6'-8"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
5'-0"
4'-0"
6'-8"
7'-10"
6'-8"
7'-10"
6'-8"
7'-10"
6'-8"
5'-0"
6'-8"
5'-0"
2'-0"
4'-0"
1'-6"
6'-0"
4'-0"
2'-8"
6'-8"
15'-6"
7'-0"
7'-8"
7'-0"
4'-6"
6'-8"
1'-10"
6'-8"
5'-0"
5'-0"
8'-0"
4'-0"
1'-10"
6'-8"
5'-10"
6'-8"5'-0"6'-8"
(E) ELEC PANEL
(E) GAS METER
(E) FIREPLACE
2e 3e 6e 9e
Ae
Be
Fe
Ge
He
0' - 0"
-0' - 7"
-0' - 6"
-0' - 6"
-1' - 0"
58'-7"
10'-6" 22'-6" 25'-7"
58'-2"
3'-4" 7'-5" 34'-0" 13'-5"
NOTE: ALL EXISTING DIMENSIONS TO BE FIELD VERIFIED BY LICENSED GENERAL CONTRACTOR

NOTIFY THIS OFFICE OF ANY DISCREPANCIES BETWEEN EXISTING FIELD CONDITIONS AND ARCHITECTURAL DRAWINGS STUDY
24'-8"
19'-1 3/4"
1/4" = 1'-0" 1 EXISTING FLOOR PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:15:28 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

EXISTING FLOOR PLAN
A060
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE

EXISTING EAST ELEVATION

EXISTING SOUTH ELEVATION

EXISTING SOUTHWEST ELEVATION

EXISTING NORTH ELEVATION
EXHIBIT 3
197 of 348
A061
2 A061
1 A061
3 A061
4 2e 3e 6e 9e
Ae
Be
Fe
Ge
He
3" / 12"
3" / 12" 3" / 12"
3" / 12"
(E) RIDGE
(E) RIDGE
(E) VALLEY
(E) VALLEY
(E) HIP
(E) HIP
(E) BUILDING OUTLINE BELOW
(E) CHIMNEY
2' - 9"
1' - 5 1/8"
1' - 8"
1' - 8"
0' - 8"
1' - 0"
ROOF EAVE TYP.
1' - 0"
1' - 0"
1' - 0"
58'-7"
10'-6" 22'-6" 25'-7"
3'-4" 7'-5" 34'-0" 13'-5"
1 2
0 4 8 16
1/8"=1'-0"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:16:21 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

EXISTING ROOF PLAN
A063
Author
Designer
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
1/4" = 1'-0" 1 EXISTING ROOF PLAN
EXHIBIT 3
198 of 348
2e 3e 6e 9e
Ae
Be
Fe
Ge
He
1 2
0 4 8 16
1/8"=1'-0"
(E) ELEC PANEL TO REMAIN
(PER SPOT CHECK BY GWP)
(E) GAS METER TO REMAIN
(E) FIREPLACE TO

BE DEMOLISHED
A080
7 A080
4 A080
6 A080
5 10' - 6" 22' - 6" 25' - 7"
3' - 4" 7' - 5" 34' - 0" 13' - 5"
F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.

F.O. FIN.F.O. FIN.F.O. FIN.F.O. FIN.
19' - 1"
24' - 8"
58'-7"
58'-2"
NOTE: GENERAL CONTRACTOR RESPONSIBLE FOR SHORING

EXISTING STRUCTURE IN PLACE DURING CONSTRUCTION
NOTE: ALL EXISTING WINDOWS TO BE REPLACED
NOTE: DUE TO THE EXTENT OF

DEMOLITION, BEARING CONDITIONS

SHALL BE EVALUATED AND SHORED

PROPERLY
NOTE: CHANGES IN CONCRETE

ELEVATION SHALL BE EVALUATED
ONCE FRAMING IS EXPOSED.

NOTE: BEARING LINE(S) SHALL BE

EVALUATED ONCE FRAMING IS
EXPOSED.
1/4" = 1'-0" 1 DEMOLITION PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:16:56 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

DEMO FLOOR PLAN
A070
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
EXHIBIT 3
199 of 348
FD
FD
FD
573 SF
2358 SF
17 SF GARAGE

COVERED
AREA
171 SF

COVERED AREA

OPEN TO
BELOW
1331 SF
328 SF

BALCONY
806 SF
(E) ROOF
1668 SF
(E) ROOF TO BE

REPLACED
623 SF
(E) ROOF
(E) 1ST FLOOR 1
0' - 0"
Grade
-0' - 6"
K
154 SF
L
4 SF

TOTAL EXISTING
K
L
M
162 SF DEMOLISHED/ 527 SF TOTAL
31%
527 SF
X SF
X SF
5'-0"
10"
18'-2"
8' - 6"
28' - 1" 32' - 5"
8' - 11 1/2"
154 SF
4 SF
4 SF
M
4 SF
(E) 1ST FLOOR 1
0' - 0"
Grade
-0' - 6"
H
12 SF
I
12 SF
J
194 SF

TOTAL EXISTING
H
I
J
218 SF DEMOLISHED/ 601 SF TOTAL
36%
601 SF
12 SF
12 SF
194 SF
14' - 6 1/2" 20' - 3" 24' - 0 1/2"
3' - 0" 3' - 0" 10' - 0 1/4" 9' - 9 3/4"
8' - 7 1/4" 2' - 5 1/2"
4' - 0"4' - 0"
(E) 1ST FLOOR 1
0' - 0"
Grade
-0' - 6"
C
96 SF
E
18 SF
F
33 SF

TOTAL EXISTING
C
D
E
F
153 SF DEMOLISHED/ 473 SF TOTAL
32%
473 SF
5'-0"
6'-8"
13'-1 1/2" 5'-0"
3'-6"
7'-3 3/4"
96 SF
6 SF
18 SF
33 SF
10" 7'-3 3/4"
48' - 10" 10' - 5"
8 1/4"
4'-3 3/4"
10" 2'-8"
D
6 SF
(E) 1ST FLOOR 1
0' - 0"
Grade
-0' - 6"
B
18 SF
601 SF TOTAL EXISTING
A
18 SF DEMOLISHED/ 601 SF TOTAL
3%
3'-0" 1'-0"
2'-9 1/4"2'-2 3/4"
18 SF
58'-10"
8'-6"
7'-6 3/4" 6'-0 1/4"
615 SF

GARAGE AREA
2459 SF

LIVING AREA
3593 SF

LOT COVERAGE
1344 SF

LIVING AREA
328 SF
(N) BALCONY AREA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:17:31 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

AREA CALCULATIONS
A080
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
1" = 10'-0" 1
(N) FIRST FLOOR AREA (NET)
1" = 10'-0" 2
(N) 2ND FLOOR AREA (NET)
(E) ROOF 1428 SF 46%
(E) ROOF TO BE REPLACED 1668 SF 54%
TOTAL ROOF AREA 3097 SF
1" = 10'-0" 3
(E) ROOF TO BE DEMO'D
1/8" = 1'-0" 4 EXISTING NORTH ELEVATION - DEMO
1/8" = 1'-0" 5 EXISTING WEST ELEVATION - DEMO
1/8" = 1'-0" 6 EXISTING SOUTH ELEVATION - DEMO
1/8" = 1'-0" 7 EXISTING EAST ELEVATION - DEMO
EAST
A
SOUTH
C
D
E
F
WEST
H
I
J
NORTH
K
L
M
TOTAL
18 18
153
96 6
18 33
216
12 12
194
162
154
4 4
551
AREA

DEMO (SF)
AREA

TOTAL (SF)
601
473
601
527
2202
%
DEMO
3%
32%
36%
31%
25%
(E) WALLS TO BE DEMOLISHED
(E) ROOF TO BE DEMOLISHED

TO REMAIN
1" = 10'-0" 8
(N) FIRST FLOOR - GROSS FLOOR AREA
1" = 10'-0" 9
(N) LOT COVERAGE
1" = 10'-0" 10 (N) SECOND FLOOR - GROSS FLOOR AREA
3097 ROOF + 2202 WALLS = 5299 SF TOTAL
551 DEMO WALL + 1668 DEMO ROOF = 2219 SF DEMO
2219/5299 = 41.8% DEMO

TOTAL AREA TO BE DEMOLISHED
EXHIBIT 3
200 of 348
24" 24"
(1110')
(1104')
(1106')
(1100')
(1096')
(1110')
(1112')
(110
8')
(1
11 0')
(1112')
(1
1 08')
(1114')
(1
1 18')
1 2
0 4 8 16
1/8"=1'-0"

ENTRY WALKWAY
(E)

LANDSCAPE
(E) DRIVEWAY
APRON
(E) PLANTERS
PROPERTY LINE N80°14'49"E 117.52'
(E) SIDEWALK
WHITEHAVEN TERR.

L= 45.20 R=35.00
D=073°59'46"
L= 33.69 R=35.00
D=073°59'46" N80°35'01"E 11.67'
PROPERTY LINE N09°24'59"W 136.13'

PROPERTY
LINE
N09°25'47"E
1 14.86'

PROPERTY LINE

BRICK PILLARS

ADJACENT

BUILDING

ADJACENT

BUILDING
W
E
G
W
1 2e 3e 4 5 6e 7 8 9e
Ae
Be
D
Fe
Ge
He
C
E

REAR SETBACK
10' - 0"

SIDE SETBACK
10' - 0"

FRONT SETBACK
15'-0"
(E) BLDG. SETBACK TO REMAIN
9'-1 1/4"
1 2
2 2
906 WHITEHAVEN TER.

PROPOSED 2-STORY
ADDITION TO EXISTING 1938

SF SINGLE FAMILY HOME
3 4' - 10"
19' - 10"
4 5
6 (N) BLDG. REAR SETBACK
42' - 10 1/2"
8 7
11' - 9 1/2" 10' - 6" 2' - 2 1/2" 15' - 9 1/2" 4' - 6" 10' - 9" 10' - 11" 3' - 11" 1' - 6" 3' - 4" 7' - 5" 4' - 1" 8' - 4" 11' - 1 1/4" 10' - 5 3/4" 13' - 5" I
(N) BLDG. SETBACK
14' - 9"
2% MIN
SLOPE

LANDSCAPING
2447 S.F.

HILLSIDE TO REMAIN UNDISTURBED

LANDSCAPING
934 S.F.

LANDSCAPING

LANDSCAPING
87 S.F.

LANDSCAPING
575 S.F.

LANDSCAPING
200 S.F.

LANDSCAPING
358 S.F.

LANDSCAPING
506 S.F.

TRASH ENCLOSURE
/POOL EQUIPEMTN
200 S.F.

LANDSCAPING
174 S.F.
2% MIN
SLOPE
2% MIN
SLOPE
CONC. LANDING
6"

DECK EXTENSION
6'-2"

SETBACK TO EDGE OF (N) DECK
21'-6 1/2"
22'-3 1/2"
(N) 2ND FLR BDLG. SETBACK
10'-1 1/4"

SIDE SETBACK
10'-0"
(N) BBQ
AREA
21'-8 1/4"
28'-5 1/4"
1 A101

SEE L SHEETS FOR LANDSCAPE DESIGN
(N) RETAINING WALL

SEE LANDSCAPE DWG'S FOR FENCE
AND RET. WALL INFORMATION
9 10
11 12
2'-11"
(E) RET. WALL

REFER TO LANDSCAPE

DWG'S FOR GATE/FENCE

INFORMATION
2 A101

SEE L SHEETS FOR LANDSCAPE DESIGN
= PROPERTY LINE
(N) = NEW CONSTRUCTION
(E) = EXISTING STRUCTURE
= NEW FIRST FLOOR AREA
3' - 0"
6' - 8"
3' - 0"
6' - 8"
= (E) WINDOW TAG
WIDTH
HEIGHT
= (E) DOOR TAG
WIDTH
HEIGHT
= SETBACK LINE
= EXISTING FLOOR AREA
= NEW SECOND FLOOR AREA
VIF = VERIFY IN FIELD
P.U.E. = PUBLIC UTILITY EASEMENT
RCP = REINFORCED CONCRETE PIPE
W = WATER METER
E = ELECTRICAL METER
G = GAS METER
= COVERED AREA
= ADJACENT PROPERTIES
= LANDSCAPE AREA
= NEW SECOND FLOOR WINDOWS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
1/9/2025 2:51:07 PM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

SITE PLAN
A100
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
1/8" = 1'-0" 1 PROPOSED SITE PLAN
REV. NO. REVISION DATE

SITE PLAN NOTES

1. THERE ARE NO OAKS, BAY, OR SYCAMORE TREES (PROTECTED TREES) ON THE SITE OR WITHIN 20 FEET OF THE SITE.

2. NO ROOFTOP EQUIPMENT SHALL BE PERMITTED IN THE ROS, R1R AND R1 ZONES

3. RETAINING WALLS, POOLS, SPAS, JACUZZIS, FENCES, AND PATIO COVERS REQUIRE A SEPARATE PERMIT.

4. APPROVED ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION

SHALL BE PLACED IN A POSITION THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET, ROAD, ALLEY, AND WALKWAYS GIVING ACCESS TO AND WITHIN THE PROPERTY. THESE NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDRESS NUMBERS SHALL BE ARABIC NUMERALS OR ALPHABET LETTERS. NUMBERS SHALL BE A MINIMUM OF 4 INCHES HIGH WITH A MINIMUM STROKE WIDTH OF 0.5 INCH AND SHALL BE ILLUMINATED IN AN APPROVD MANNER (IF NUMBERS ARE ON THE EXTERIOR). NUMBER HEIGHT AND STROKE WIDTH SHALL BE INCREASED AS NEEDED FOR LEGIBILITY BASED ON VISIBILITY DISTANCE.

5. SHALL PROVIDE RAIN GUTTERS AND CONVEY RAIN WATER TO THE STREET.

6. NO ROOFTOP EQUIPMENT SHALL BE VISIBLE FROM THE STREET. ANY NEW ROOFTOP EQUIPMENT SHALL BE SCREENED FROM VIEW.

7. THERE SHALL BE NO EXTENSIVE GRADING (CUT&FILL) BEYOND TYPICAL FOOTING EXCAVATION.

8. SEE TOPOGRAPHIC SURVEY ON SHEET A102 FOR FURTHER INFORMATION.

9. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND VERIFY WITH ARCHITECT BEFORE

PROCEEDING

CUT FILL CALCULATION
FILL
EX. POOL: 237 SF x 4'6 AVG. DEPTH = 1066 FT3 = + 39.4 CU YD.

DECK EXTENSION: 6 SF x 88' = 528 FT3 = 10.9 CU YD.

CUT
NEW POOL: 324 SF x 4' AVG. DEPTH = 1296 FT3 = 48 CU YD.

CUT/FILL BALANCING

19.5 cu yd. + 39.4 cu yd. - 48 cu yd. = 10.9 cu. yd. OVERALL FILL

SITE PLAN LEGEND

SITE PLAN KEYNOTES

NOTE NUMBER NOTE TEXT
1 573 SF 3 CAR GARAGE (TO BE RENOVATED)
2 (E) NON-PROTECTED TREES
3 BUILDING OVERHANG/AWNING 146 SF
4 1ST FLOOR ADDITION 312 SF
5 2ND FLOOR ADDITION 1381 SF
6 EDGE OF EXISTING BUILDING PAD
7 ENTRY COVERED AREA 14 SF
8 1ST FLOOR ADDITION 20 SF
9 (N) POOL LOCATION 370 SF (UNDER SEPARATE PERMIT)
10 (N) SPA LOCATION 47 SF (UNDER SEPARATE PERMIT)
11 (N) FIREPIT
12 (E) POOL TO DEMOLISHED
EXHIBIT 3
201 of 348
Grade
-0' - 6"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(E) 1ST FLOOR 2
0' - 6"
5'-9"

PROPERTY LINE PROPERTY LINE

COMPACTED FILL AS REQ'D

FOR PLANTING ONLY

EXISTING GRADE (NO

CHANGE)

BEDROCK PER SOILS
REPORT
(N) POOL OUTLINE
(E) SLAB EDGE
3'-7"
DAYLIGHT DIS.
16'-7 1/2"
2 A101
3'-8"
EL +1114.15'
EL +1117.82'
T.O. (N) GUARDRAIL
T.O. (E) CONC. PAD
13'-0 3/4"

PROPERTY LINEPROPERTY LINE
8 1/4"
EL. + 1114.15' T.O. (E) CONC. PAD
11'-7"
10'-0"
EL. + 1117.82' T.O. GUARDRAIL
8 1
2'-6" MIN, 3'-7" MAX
VARIES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
1/9/2025 2:54:46 PM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

SITE SECTION
A101
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
1/8" = 1'-0" 1 SITE SECTION
1/8" = 1'-0" 2 REAR RETAINING WALL ELEVATION
1 2
0 4 8 16
1/8"=1'-0"
NOTE

NUMBER NOTE TEXT
1 1 5/8" THICK LIMESTONE VENEER BY "CREATIVE MINES" IN "CRAFT ORCHARD LIMESTONE - WILDFLOWER" FINISH
2 ALUMINUM-CLAD WOOD WINDOWS BY "JELD-WEN". EXTERIOR CLAD COLOR IN "CHESTNUT BRONZE" WITH DOUBLE PANE GLASS AND FULL SURROUND WOOD GRILLES.
2a WOODEN CUSTOM ENTRY DOOR WITH SIDELITE AND TRANSOM TO MATCH

WINDOW FINISH
3 BOARD AND BATTEN "HARDIE PANEL" BY "JAMES-HARDIE" IN SMOOTH FINISH.

PRIME AND PAINT "DUNN EDWARDS" "WARM WHITE DEW-380"
4 ENGINEERED POLYMER SYNTHETIC SLATE SHINGLE ROOF BY "DA VINCI" IN MULTI-WIDTH, COLOR "SLATE BLACK"
5 7/8"THK. MATCHING APPLIED EXTERIOR STUCCO BY "LA HABRA" - 20/30 CEMENT FLOAT FINISH. CONTRACTOR TO PREP STUCCO FOR PAINT APPLICATION. PAINT "DUNN EDWARDS" "MILK GLASS DEW 358"
6 ORNAMENTAL WOODEN MOULDINGS, TRIMS, CORBELS, FASCIA, ETC., COLOR BY DUNN EDWARDS ESPRESSO MACCHIATO DET680, SEE DETAILS FOR

DIMENSIONAL SPECIFICATIONS
7 CHESHIRE TALL 3/4 WALL LANTERN BY "CHAPAMN & MYERS" CHO2607

EXTERIOR WALL SCONCE
8 ALUMINUM GLASS PANEL GUARD RAIL BY "PEAK PRODUCTS" MODEL TYPE "PEAK MOUNTAINVIEW GLASS RAILING" IN BLACK
9 CORROSION RESISTANT WEEP SCREED BENEATH STUCCO, MINIMUM 4" ABOVE EARTH AND 2" ABOVE PAVED AREA
10 4" GUTTER 24GA ALUMINUM DOWN SPOUT, COLOR TO MATCH TRIM ELEMENTS 11 TRAFFIC COATING WATERPROOFING AT BALCONIES, OUTDOOR DECKS BY "DEX-O-TEX", MODEL LINE "DEX-FLEX" COLOR TO MATCH INETRIOR FLOOR FINISH
12 INSULATED SECTIONAL OVERHEAD GARAGE DOOR BY "Wayne-Dalton" MODEL "8680"
13 CUSTOM MATTE BLACK STAINLESS STEEL CHIMNEY CAP WITH CALIFORNIA

EXTERIOR FINISH SCHEDULE
EXHIBIT 3
202 of 348
D
GFI

GFI GFI

GFI GFI

GFI GFI GFI

GFI GFI
GFI
GFI
GFI
JB
JB JB
JB
DRYER VENT SIZE:
4" DIA. W/(2) 90 DEGREE BENDS: 14'-0" MAX.
5" DIA. W/(2) 90 DEGREE BENDS: 19'-0" MAX.
6" DIA. W/(2) 90 DEGREE BENDS: 23'-0" MAX.

NOTE: 100 SQ. INCHES OF MAKE-UP AIR
REQUIRED AT LAUNDRY ROOM.

W.C. MINIMUM CLEAR SPACE PER CPC 407.6
2' - 0" MIN.
1' - 3" MIN.
2' - 6" MIN.
2 1
10 ADD BLOCKING FOR WALL MOUNTED RAILING
PROVIDE "PLI-DECK" WATERPROOFING MEMBRANE AT ALL DECKS AND BALCONIES ICC ESR-2097, LA R.R. #25375 OVER EXTERIOR GRADE PLYWOOD SHEATHING 3 DIRECT-VENT GAS FIRPLACE BY "SUPERIOR FIREPLACES ICBO ER #5159 OR APPROVED EQ., PROVIDE NON-COMBUSTABLE HEARTH MATERIAL.
4 5 SHOWER MIN CLEAR SPACE 30" DIAMETER AND MIN. AREA 1,024 SQ IN. PER CPC 408.6

EXISTING CONSTRUCTION

NEW CONSTRUCTION

EXISTING WALLS TO REMAIN

EXISTING WALLS TO REMOVE
NEW 2x AT 16" o.c. WOOD STUD WALL, U.N.O.
1 HR FIRE RATED WALL
WINDOW TAG & WINDOW TYPE MARK #
DOOR TAG & DOOR TYPE MARK #
WALL SWITCH AT 48" A.F.F.

DIMMER WALL SWITCH AT 48" A.F.F.

DUPLEX ELECTRICAL OUTLET

GROUND FAULT CIRCUIT-INTERRUPTER

CEILING MOUNTED INCANDESENT LTG FIXTURE

RECESSED CEILING MOUNTED FUORESCENT LIGHT FIXTURE

WALL MOUNTED OUTDOOR LIGHT FIXTURE
SMOKE DETECTOR SEE NOTE #6
CARBON MONOXIDE DETECTOR SEE NOTE #7
FAN EXHAUST MINIMUM 50 CFM EXHAUSTING (100CFM IN
KITCHEN_), "ENERGY STAR" COMPLIANT, CONTROLLED BY

HUMIDISTAT

JUNCTION BOX

FLOOR DRAIN

INVERTER FOR FUTURE SOLAR PANEL AT ROOF LEVEL

MAIN ELECTRIC SERVICE PANEL

KEYNOTE
1i
1i
S.D.
(E)
(N)
C.O.

F
FD
INV
ELEC
1 RAISED FLOOR OVER

SLAB ON GRADE
JB

1. PROVIDE ULTRA LOW FLUSH WATER CLOSET FOR ALL NEW CONSTRUCTION. EXISTING SHOWER HEADS AND TOILETS MUST BE ADAPTED FOR LOW WATER CONSUMPTION.

2. MINIMUM 72" HGT. NON-ABSORBENT WALL (TILE) REQUIRED ADJACENT TO SHOWER AND APPROVED SHATTER-RESISTANT MATERIALS SHALL BE PROVIDED FOR SHOWER ENCLOSURE.

3. ALL NEW WINDOWS SHALL BE DOUBLE PANE UNLESS OTHERWISE NOTED.

4. PROVIDE FIBER GLASS BATT INSULATION IN NEW AREAS AS PER TTL-24 ENERGY COMPLIANCE CALC'S.

5. INSTALL GFCI OUTLETS IN NEW BATHROOMS, KITCHEN.

6. SMOKE DETECTORS SHALL BE PROVIDED AS FOLLOWS:
a. IN NEW CONSTRUCTION SMOKE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER SOURCE

FROM THE BUILDING WIRING AND SHALL BE EQUIPPED WITH BATTERY BACK-UP AND LOW BATTERY SIGNAL. SMOKE DETECTORS SHALL BE LOCATED IN EACH SLEEPING ROOM, HALLWAY AND AREA

GIVING ACCESS TO A SLEEPING ROOM, AND ON EACH STORY AND BASEMENT FOR DWELLING WITH

MORE THAN ONE STORY
b. IN EXISTING CONSTRUCTION SMOKE DETECTORS MAY BE BATTERY OPERATED, INSTALLED IN LOCATIONS AS SPECIFIED ABOVE.

7. CARBON MONOXIDE DETECTOR. INSTALL CARBON MONOXIDE DETECTOR IN THE LIVING SPACE NEAR THE BEDROOM. DETECTORS ARE REQUIRED IN DWELLINGS WHERE FUEL BURNING APPLIANCES ARE INSTALLED. CARBON MONOXIDE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER FROM THE BUILDING ELECTRICAL AND HAVE A BATTERY BACKUP. CARBON MONOXIDE DETECTORS SHALL COMPLY WITH UL2034 AND/OR NFPA 720. CO DETECTORS
DETECTORS SHALL COMPLY WITH UL2034 AND/OR NFPA 720. CO DETECTORS SHALL BE INSTALLED A MINIMUM OF FIVE (5) FEET ABOVE FINISH GRADE. CA RESIDENTIAL CODE 2011 CHAPTER 3 SEC. 315

8. WATER HEATER MUST BE SEISMIC STRAPPED TO WALL IN TWO PLACES. ONE, IN THE UPPER 1/3 OF THE TANK. THE LOWER POINT SHALL BE A MINIMUM OF 4 INCHES ABOVE THE CONTROLS.

A T&T VALVE PIPE TO THE EXTERIOR. A MINIMUM 50 SQ. INCHES VENT. IN THE TOP & BOTTOM OF THE W/H COMPARTMENT.

9. PLUMBING FIXTURES ARE REQUIRED TO BE CONNECTED TO A SANITARY SEWER OR TO AN APPROVED SEWAGE DISPOSAL SYSTEM (R306.3).

10.KITCHEN SINKS, LAVATORIES, BATHTUBS, SHOWERS, BIDETS, LAUNDRY TUBS AND WASHING

MACHINE OUTLETS SHALL BE PROVIDED WITH HOT AND COLD WATER AND CONNECTED TO AN APPROVED WATER SUPPLY (R306.4).

11.BATHTUB AND SHOWER FLOORS, WALLS ABOVE BATHTUBS WITH A SHOWERHEAD, AND SHOWER COMPARTMENTS SHALL BE FINISHED WITH A NONABSORBENT SURFACE. SUCH WALL SURFACES SHALL EXTEND TO A HEIGHT OF NOT LESS THAN 6 FEET ABOVE THE FLOOR (R307.2).

12.ALL NEWLY INSTALLED PLUMBING FIXTURES SHALL COMPLY WITH TABLE 4.303.2

13.EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH NATURAL LIGHT BY MEANS OF EXTERIOR GLAZED OPENINGS IN ACCORDANCE WITH SECTION R303.1 OR SHALL BE PROVIDED WITH ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN AVERAGE ILLUMINATION OF 6 FOOT-CANDLES OVER THE AREA OF THE ROOM AT A HEIGHT OF 30 INCHES ABOVE THE FLOOR LEVEL. (R303.1)

14.PROVIDE AN APPROVED SPARK ARRESTER FOR THE CHIMNEY OF A FIREPLACE, STOVE, OR BARBECUE.” (L.A.M.C. 57.20.25 )

15. PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4 INCHES ABOVE THE EARTH OR 2 INCHES ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. (SHOW THESE DIMENSIONS ON A FOUNDATION DETAIL DRAWING) (SECTION 2512.1.2) A201
1 A201
2 W.C.

LAV.

S.D.

C.O.
8% GLAZING AREA SF: 20 > 17.3 SF MIN.
5% VENTILATION AREA SF: 20 > 10.8 SF MIN. TILE WD
ELEC.

RANGE

DBL SINK
REF.
1 A300
2 A300
1 1 2e 3e 4 5 6e 7 8 9e
Ae
Be
D
Fe
Ge
He
C
E
573 SF
GARAGE
80 SF
BATH
37 SF
CLOSET
216 SF
BED
222 SF
BED
11'-9 1/2" 10'-6" 2'-2 1/2" 15'-9 1/2" 4'-6" 10'-9" 10'-11" 3'-11" 3'-4" 7'-5" 4'-1" 8'-4" 11'-1 1/4" 10'-5 3/4" 13'-5"
298 SF
DINING
467 SF
LIVING
272 SF
ENTRY
287 SF

KITCHEN
42 SF
PANTRY
78 SF

LAUNDRY
45 SF
CLOSET
62 SF
POWDER
61 SF
HALL
3'-6"
A202
1 A202
2 7'-9" 12'-0" 3'-10"
1 2
0 4 8 16
1/4"=1'-0"
8% GLAZING AREA SF: 53.33 > 17.4 SF MIN.
5% VENTILATION AREA SF: 36.66 > 10.9 SF MIN.
2'-6" 3'-5 1/4" 5'-0" 3'-5" 4'-1 1/4" 1'-1"
106
108 107
105
106
118
116
113
114
115
111
110
117
112
104
101
103
102 101
105
110
108
103
104
102
W.C. LAV.

S.D.

S.D.
1 TILE WD
0' - 0"
0' - 0" -0' - 6"
-1' - 0"
16R@7 1/8"
17T@11"
9'-3" 10'-0" 13'-9 3/4" 7'-7 3/4" 1'-8 1/4" 4'-3 3/4" 6'-6" 4'-0 1/4" 3'-6 3/4" 4'-8" 4'-11" 8'-9 1/4" 3'-10 1/2" 6'-9 1/2"
3'-3 3/4" 5'-0" 3'-3 3/4" 2'-8" 2'-11" 2'-11" 2'-8" 5'-10 1/2" 2'-6 1/4" 1'-6" 6'-0 1/4" 2'-3" 9'-7 1/4" 4'-4 1/2"
ALIGN
3'-7 3/4" 2'-2" 1'-8 1/2" 5'-3 3/4"
2'-11"
6 1/2"
6"
3'-7 1/2"
ALIGN
3'-5 3/4"
1'-8 1/4" 2'-1" 1'-9" 6'-1 1/2" 3'-7" 7'-8 3/4" 1'-9"
ALIGN
ALIGN
ALIGN
1'-8"
1' - 4"
TUB
ALIGN
ALIGN
HOOD
D.W.

EQ EQ
2'-0"
120

BAR SINK
3'-6"
EQ EQ
(N) CONC. SLAB

ADDED TO LEVEL
FLOOR
(N) CONC. SLAB ADDED

TO LEVEL FLOOR
(N) CONC. SLAB ADDED
ALIGN
(N) GAS FIREPLACE
10 2
D
W
4 4'-0"
ALIGN
6"
109
9'-4"
23'-3"
24'-8"
A091
1 1
A101
EQ EQ
111
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:19:56 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

FIRST FLOOR PLAN
A102
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024

FLOOR PLAN NOTES

SYMBOLS LEGEND

PLAN KEYNOTES LEGEND
1/4" = 1'-0" 1 PROPOSED FIRST FLOOR
REV. NO. REVISION DATE
EXHIBIT 3
203 of 348
D
GFI

GFI GFI
FD
FD
FD
JB
JB
JB
JB
JB
JB

EXISTING CONSTRUCTION

NEW CONSTRUCTION

EXISTING WALLS TO REMAIN

EXISTING WALLS TO REMOVE
NEW 2x AT 16" o.c. WOOD STUD WALL, U.N.O.
1 HR FIRE RATED WALL
WINDOW TAG & WINDOW TYPE MARK #
DOOR TAG & DOOR TYPE MARK #
WALL SWITCH AT 48" A.F.F.

DIMMER WALL SWITCH AT 48" A.F.F.

DUPLEX ELECTRICAL OUTLET

GROUND FAULT CIRCUIT-INTERRUPTER

CEILING MOUNTED INCANDESENT LTG FIXTURE

RECESSED CEILING MOUNTED FUORESCENT LIGHT FIXTURE

WALL MOUNTED OUTDOOR LIGHT FIXTURE
SMOKE DETECTOR SEE NOTE #6
CARBON MONOXIDE DETECTOR SEE NOTE #7
FAN EXHAUST MINIMUM 50 CFM EXHAUSTING (100CFM IN
KITCHEN_), "ENERGY STAR" COMPLIANT, CONTROLLED BY

HUMIDISTAT

JUNCTION BOX

FLOOR DRAIN

INVERTER FOR FUTURE SOLAR PANEL AT ROOF LEVEL

MAIN ELECTRIC SERVICE PANEL

KEYNOTE
1i
1i
S.D.
(E)
(N)
C.O.

F
FD
INV
ELEC
1 RAISED FLOOR OVER

SLAB ON GRADE
JB

1. PROVIDE ULTRA LOW FLUSH WATER CLOSET FOR ALL NEW CONSTRUCTION. EXISTING SHOWER HEADS AND TOILETS MUST BE ADAPTED FOR LOW WATER CONSUMPTION.

2. MINIMUM 72" HGT. NON-ABSORBENT WALL (TILE) REQUIRED ADJACENT TO SHOWER AND APPROVED SHATTER-RESISTANT MATERIALS SHALL BE PROVIDED FOR SHOWER ENCLOSURE.

3. ALL NEW WINDOWS SHALL BE DOUBLE PANE UNLESS OTHERWISE NOTED.

4. PROVIDE FIBER GLASS BATT INSULATION IN NEW AREAS AS PER TTL-24 ENERGY COMPLIANCE CALC'S.

5. INSTALL GFCI OUTLETS IN NEW BATHROOMS, KITCHEN.

6. SMOKE DETECTORS SHALL BE PROVIDED AS FOLLOWS:
a. IN NEW CONSTRUCTION SMOKE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER SOURCE

FROM THE BUILDING WIRING AND SHALL BE EQUIPPED WITH BATTERY BACK-UP AND LOW BATTERY SIGNAL. SMOKE DETECTORS SHALL BE LOCATED IN EACH SLEEPING ROOM, HALLWAY AND AREA

GIVING ACCESS TO A SLEEPING ROOM, AND ON EACH STORY AND BASEMENT FOR DWELLING WITH

MORE THAN ONE STORY
b. IN EXISTING CONSTRUCTION SMOKE DETECTORS MAY BE BATTERY OPERATED, INSTALLED IN LOCATIONS AS SPECIFIED ABOVE.

7. CARBON MONOXIDE DETECTOR. INSTALL CARBON MONOXIDE DETECTOR IN THE LIVING SPACE NEAR THE BEDROOM. DETECTORS ARE REQUIRED IN DWELLINGS WHERE FUEL BURNING APPLIANCES ARE INSTALLED. CARBON MONOXIDE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER FROM THE BUILDING ELECTRICAL AND HAVE A BATTERY BACKUP. CARBON MONOXIDE DETECTORS SHALL COMPLY WITH UL2034 AND/OR NFPA 720. CO DETECTORS
DETECTORS SHALL COMPLY WITH UL2034 AND/OR NFPA 720. CO DETECTORS SHALL BE INSTALLED A MINIMUM OF FIVE (5) FEET ABOVE FINISH GRADE. CA RESIDENTIAL CODE 2011 CHAPTER 3 SEC. 315

8. WATER HEATER MUST BE SEISMIC STRAPPED TO WALL IN TWO PLACES. ONE, IN THE UPPER 1/3 OF THE TANK. THE LOWER POINT SHALL BE A MINIMUM OF 4 INCHES ABOVE THE CONTROLS.

A T&T VALVE PIPE TO THE EXTERIOR. A MINIMUM 50 SQ. INCHES VENT. IN THE TOP & BOTTOM OF THE W/H COMPARTMENT.

9. PLUMBING FIXTURES ARE REQUIRED TO BE CONNECTED TO A SANITARY SEWER OR TO AN APPROVED SEWAGE DISPOSAL SYSTEM (R306.3).

10.KITCHEN SINKS, LAVATORIES, BATHTUBS, SHOWERS, BIDETS, LAUNDRY TUBS AND WASHING

MACHINE OUTLETS SHALL BE PROVIDED WITH HOT AND COLD WATER AND CONNECTED TO AN APPROVED WATER SUPPLY (R306.4).

11.BATHTUB AND SHOWER FLOORS, WALLS ABOVE BATHTUBS WITH A SHOWERHEAD, AND SHOWER COMPARTMENTS SHALL BE FINISHED WITH A NONABSORBENT SURFACE. SUCH WALL SURFACES SHALL EXTEND TO A HEIGHT OF NOT LESS THAN 6 FEET ABOVE THE FLOOR (R307.2).

12.ALL NEWLY INSTALLED PLUMBING FIXTURES SHALL COMPLY WITH TABLE 4.303.2

13.EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH NATURAL LIGHT BY MEANS OF EXTERIOR GLAZED OPENINGS IN ACCORDANCE WITH SECTION R303.1 OR SHALL BE PROVIDED WITH ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN AVERAGE ILLUMINATION OF 6 FOOT-CANDLES OVER THE AREA OF THE ROOM AT A HEIGHT OF 30 INCHES ABOVE THE FLOOR LEVEL. (R303.1)

14.PROVIDE AN APPROVED SPARK ARRESTER FOR THE CHIMNEY OF A FIREPLACE, STOVE, OR BARBECUE.” (L.A.M.C. 57.20.25 )

15. PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4 INCHES ABOVE THE EARTH OR 2 INCHES ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. (SHOW THESE DIMENSIONS ON A FOUNDATION DETAIL DRAWING) (SECTION 2512.1.2) A202
2 A201
1 1
A300
2 A300
2'-2 1/4" 7'-0 3/4" 3'-0 1/2" 5'-6" 3'-0 1/2"
1 2e 3e 4 5 6e 7 8 9e
Ae
Be
D
Fe
Ge
He
C
E
11'-9 1/2" 10'-6" 2'-2 1/2" 15'-9 1/2" 4'-6" 10'-9" 10'-11" 3'-11" 1'-6" 3'-4" 7'-5" 4'-1" 8'-4" 11'-1 1/4" 10'-5 3/4" 13'-5" A202
1 A201
2 9'-10 3/4"
1'-0"
1'-0" 19'-5 1/4" 16'-4"
15'-9 1/2" 15'-3" 10'-11"
4'-10" 11'-6" 19'-5 1/4" 8'-0 1/2" 3'-10 1/2"

OPEN TO
BELOW
189 SF
BED
21 SF
CLOSET
42 SF
BATH
152 SF
BED 89 SF
HALL
55 SF
BATH
92 SF
CLOSET
277 SF
BED
134 SF
BATH
21 SF
WC
14 SF
CLOSET
5'-10 1/2" 2'-6" 7'-9 1/2" 2'-6" 5'-4 3/4"
MIN
ø 30"
W.C. LAV.
1 TILE WD

WD TILE

WD TILE
208
207
206
205
209 211
204
203
202
210
201
205
207
209 208
MIN
ø 30"
MIN
ø 30"
9' - 6"
W.C.

LAV.

SHOWER
SHOWER
1 1
LAV.

LAV.

W.C.

SHOWER
TUB
8% GLAZING AREA SF: 58 > 15 SF MIN.
5% VENTILATION AREA SF: 29 > 10 SF MIN.
8% GLAZING AREA SF: 36 > 11.7 SF MIN.
5% VENTILATION AREA SF: 24 > 7.3 SF MIN.
8% GLAZING AREA SF: 59.5 > 21.8 SF MIN.
5% VENTILATION AREA SF: 29.8 > 13.7 SF MIN.

S.D.

S.D.

S.D.
22" X 54" CEILING

ACCESS PANEL W/

DROP DOWN LADDER
I
Not Enclosed

BALCONY
6'-11 1/2"
7'-7 1/2" 2 EQ 3 EQ 3
EQ 3'-9" EQ
44'-10 1/2"
47'-8"
1'-9"
EQ EQ
ALIGN
5'-0"
1'-9"
1'-9"
1'-9"
1'-9"
1'-9 1/2"
1'-9"
1'-9" 3'-0"
2'-0" 2'-2 1/2"

BUILT-IN STORAGE
47'-8"
13 1/8":12"
SLOPE
A091
1 1
A101

ELEVATED

PLATFORM
206
201
EQ EQ
212
4'
16'-0 3/4"
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1/8":12"
SLOPE
1 2
0 4 8 16
1/4"=1'-0"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:21:08 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

SECOND FLOOR PLAN
A103
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024

FLOOR PLAN NOTES

SYMBOLS LEGEND

PLAN KEYNOTES LEGEND
REV. NO. REVISION DATE
1/4" = 1'-0" 1 PROPOSED SECOND FLOOR

NOTE NOTE TEXT
1 W.C. MIN, CLEAR SPACE PER CPC 407.6

NOTE NUMBER NOTE TEXT
13 Traffic coating waterproofing at balconies, outdoor decks by "Dex-O-Tex", model line "Dex-Flex" Color to match interior floor finish.

PLAN MATERIAL LEGEND
EXHIBIT 3
204 of 348
ROOF PLAN NOTES:

ROOF SLOPE
A. ROOF SLOPES ARE SHOWN DIRECTLY ON ROOF PLAN DRAWINGS.

B. IN THE ABSENCE OF SLOPES SHOWN ON STRUCTURAL DRAWINGS OR ARCHITECTURAL

DRAWINGS, ROUGH CARPENTER SHALL PROVIDE REQUIRED SHIMMING BELOW ROOF SHEATHING TO ALLOW FOR PROPER SLOPE TO DRAIN.

C. NO OBSTACLE SHALL PREVENT WATER FLOW TOWARD DRAINS.

D. CRICKETS MUST MAINTAIN POSITIVE SLOPE TO DRAIN AND TIE INTO DRAINAGE SYSTEM.

E. CONTRACTOR TO VERIFY ALL ROOF DRAIN SLOPES AND ROOF DRAIN ELEVATIONS.

ROOFING MATERIAL
A. PITCHED ROOF TO BE SHINGLE ROOF, TIMBERLINE COOL SERIES BY GAF - CLASS "A" ROOFING B. ROOF ASSEMBLY SHALL BE LISTED BY AN APPROVED TESTING AGENCY.

GUTTERS AND ROOF DRAINS
A. GUTTERS SHALL SLOPE 1/16" PER FOOT TOWARD RAIN WATER LEADERS.

B. DRAINS SHALL BE SIZED TO ACCOMODATE 3" PER HOUR OF RAINFALL.

C. UNLESS SPECIFIED OTHERWISE, RAIN WATER LEADERS ARE EXPOSED AND LOCATION IS SHOWN ON ROOF PLAN.

D. DOWNSPOUTS AT FLAT ROOFS SHALL BE A MINIMUM OF 4" DIAMETER WITH OVERFLOW DRAINS.

E. PROVIDE DOME WIRE BASKET AT EACH RAIN WATER LEADER AND ROOF DRAIN.

F. CONTRACTOR SHALL TEST ALL CONCEALED DOWNSPOUTS (WHERE APPLICABLE) FOR WATER LEAKAGE PRIOR TO CLOSING UP BUILDINGS AND SHALL PROVIDE A 10 YEAR WARRANTY AGAINST LEAKAGE.

G. ROOF DRAINAGE TO BE CONNECTED TO EXISTING COUNTY APPROVED DRAINAGE DEVICE. ALL RAIN WATER TO BE DIRECTED TO STREET OR APPROVED OUTLET.

H. GENERAL CONTRACTOR SHALL COORDINATE WITH THE BUILDING PLUMBING AND SITE UTILITY

CONTRACTORS TO ENSURE THAT CONNECTIONS BETWEEN RAIN WATER LEADERS, STOR AND BUILDING SANITARY ARE COMPLETED.

ROOF PENETRATION
A. VENTS AT FLAT ROOF AND ROOF STACKS SHALL PROJECT ABOVE ROOF BY THE MINIMUM

DISTANCE REQUIRED BY APPLICABLE CODES AND SHALL BE LOCATED IN AREAS NOT VISIBLE FROM STREET. EXACT LOCATION TO BE COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION.

B. ALL VENTS AND ROOF STACKS TO HAVE RAIN PROTECTION CAPS.

C. CONTINUOUS WATERPROOFING AT ALL ROOF PENETRATIONS SHALL BE PROVIDED WITH WR GRACE 4000 BITUTHENE WRAPPING AND PRE-FINISHED METAL FLASHING AND COUNTERFLASHING.

ALL JOINTS AT SHEET METAL SHALL BE CAULKED.

D. GENERAL CONTRACTOR SHALL COORDINATE WITH THE DIFFERENT TRADES FOR INSTALLATION OF ROOF PENETRATIONS PRIOR TO INSTALLATION OF THE ROOFING MEMBRANE.

E. COLOR OF ALL EXPOSED VENTS AND ROOF STACKS TO MATCH ADJACENT ROOF MATERIAL, UNLESS SPECIFIED OTHERWISE BY ARCHITECT.

F. ADD SELF-ADHERING MODIFIED BITUMEN EXTENDING 24" EACH SIDE AT ALL VALLEYS, RADIUS WALLS, CRICKETS, TOPS OF WALLS, AND TRANSITIONAL AREAS.

ROOF (ATTIC) VENTILATION
A. TOTAL ATTIC VENTILATION SHALL BE A MAXIMUM OF 1/150 OF THE AREA TO BE VENTED.

B. ATTIC DRAFT STOPS SHALL BE IN COMPLIANCE WITH ALL APPLICABLE CODES.

C. ALL VENT OPENINGS SHALL BE COVERED WITH A CORROSION RESISTANT METAL MESH WITH OPENINGS NO LARGER THAN 1/4" IN ANY DIRECTION.

D. ATTIC VENTILATION OPENINGS IN VERTICAL WALLS AND ATTIC ROOF VENTS SHALL NOT EXCEED 144 SQUARE INCHES PER OPENING AND SHALL BE COVERED WITH METAL LOUVERS AND 1/4" (6.25MM) MESH CORROSION-RESISTANT METAL SCREEN.

ROOF VENTILATION CALCULATION:
-REQUIRED AREA OF VENTILATION INTAKE SHALL BE A MAXIMUM OF 1/150 OF THE ROOF AREA TO BE VENTED:

ADDITION
964 SF / 150 = 6.43 SF TOTAL VENTILATION REQ'D
4 x 2 SF (GABLE VENT) = 8 SF
8 SF > 6.43 SF...OK
NOTE:

A COPY OF THE CONSTRUCTION DOCUMENTS OR A COMPARABLE DOCUMENT INDICATING THE INFORMATION FROM ENERGY CODE SECTIONS 110.10(b) THROUGH 110.10(c) SHALL BE PROVIDED TO

THE OCCUPANT

1. PROVIDE RAIN GUTTERS AND CONVEY RAIN WATER TO THE STREET. ROOF GUTTERS SHALL BE

PROVIDED WITH A MEANS TO PREVENT THE ACCUMULATION OF LEAVES AND DEBRIS IN THE GUTTER.

2. ROOF GUTTERS SHALL BE DESIGNED TO PREVENT THE ACCUMULATION OF LEAVES AND DEBRIS.

3. THE MAIN SERVICE PANEL SHALL HAVE A MINIMUM BUSBAR RATING OF 200 AMP. THE MAIN

ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE POLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED

SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS "FOR FUTURE SOLAR ELECTRIC."

4. ALL DOWN SPOUTS DRAIN TO RAIN GARDEN, SEE 1/A101.

BUILDING WALLS SHOWN BELOW
4" DOWNSPOUT
4" METAL GUTTER
DIRECTION OF SLOPE/GRADIENT 4:12 (N) SLOPE
A202
2 A201
1 A201
2 1
A300
2 A300
1 2
(N) 4" x 4" GUTTER
(E) RIDGE
(N) VALLEY
D.S.

BUILDING FOOTPRINT
1 2e 3e 4 5 6e 7 8 9e
Ae
Be
D
Fe
Ge
He
C
E
3" / 12"
3" / 12" 3" / 12"
3" / 12"
3" / 12" 3" / 12"
A202
1 1 2
0 4 8 16
1/4"=1'-0"
(N) RIDGE
(N) RIDGE
(N) RIDGE
(N) VALLEY
(N) VALLEY
(N) VALLEY
(N) VALLEY
(E) VALLEY
(N) RIDGE
(N) RIDGE
(E) RIDGE
(N) RIDGE
I 1'-8"
3"
1'-3"
1'-4 1/2"
11'-9 1/2" 10'-6" 2'-2 1/2" 15'-9 1/2" 4'-6" 10'-9" 10'-11" 3'-11" 1'-6" 3'-4" 7'-5" 4'-1" 8'-4" 11'-1 1/4" 10'-5 3/4" 13'-5" D.S.

FUTURE SOLAR
20' X 8'

FUTURE SOLAR
21' X 8'
D.S.
1 12
1 1
1 SECOND FLOOR OUTLINE

FIRST FLOOR OUTLINE
3 3
4 SECOND FLOOR OUTLINE

FIRST FLOOR OUTLINE
D.S.

D.S. D.S.

D.S.

D.S.

D.S.

D.S. BELOW
D.S.

D.S.

D.S.

D.S.

D.S.

A091
1 1
A101
3" / 12"
3" / 12" 3" / 12"
3" / 12"
3" / 12" 3" / 12"
3" / 12"
3" / 12"
3" / 12"

OPEN DECK BELOW
13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:21:39 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

ROOF PLAN
A104
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024

ROOF PLAN NOTES

ROOF PLAN LEGEND
1/4" = 1'-0" 1 PROPOSED ROOF PLAN

NOTE NUMBER NOTE TEXT
1 (N) CEILING ACCESS PANEL22" X 52" W/ DROP DOWN LADDER 2 ATTIC HEAT PUMP UNIT
3 CRICKET
4 (N) CHIMNEY, PLASTER FINISH

NOTE NUMBER NOTE TEXT
1 ENGINEERED POLYMER SYNTHETIC SLATE SHINGLE ROOF BY "DA VINCI" IN MULTI-WIDTH, COLOR "SLATE BLACK"
12 4" GUTTER 24GA ALUMINUM DOWN SPOUT, COLOR TO MATCH TRIM ELEMENTS 13 TRAFFIC COATING WATERPROOFING AT BALCONIES, OUTDOOR DECKS BY "DEX-O-TEX", MODEL LINE "DEX-FLEX" COLOR TO MATCH INETRIOR FLOOR FINISH

ROOF PLAN MATERIAL SCHEDULE

ROOF PLAN NOTES
REV. NO. REVISION DATE
EXHIBIT 3
205 of 348

1. EXTERIOR COLORS AND MATERIALS OF THE PROPOSED ADDITION INCLUDING WALLS, ROOFS,

AND WINDOWS MUST MATCH THE EXISTING STRUCTURES

2. 0.0 ELEVATION EQUALS MINIMUM 6 INCHES ABOVE LOWEST POINT AT SLOPED SURROUNDING GRADE.

3. CONTRACTOR SHALL INSTALL BUILDING MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
(E) 1ST FLOOR 1
0' - 0"
(E) T.O. PLATE (1)
8' - 0"
T.O. ROOF
13' - 9 1/4"
2 A300
Grade
-0' - 6"
(N) T.O. PLATE (1)
9' - 0"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(N) T.O. PLATE (2)
19' - 0 3/4"
9e 8 7 6e 5 4 3e 2e 1
(E) 1ST FLOOR 2
0' - 6"
(N) 2ND FLOOR CLG
19' - 0"
4 209
101 102
5 4
4 107 108
101
7' - 0" DOOR HT
3' - 6" SILL HT 3' - 6"
7' - 0" HEAD HT
4' - 6"
8' - 6"
3' - 0" SILL HT
7' - 0" HEAD HEIGHT
2 9
1' - 0" 9' - 6" 9' - 0" 4' - 0"
23' - 6" BUILDING HEIGHT
7' - 0" HEAD HT
12 12
5 3
3 2
2a
120
208

EQ EQ EQ
1 7
3 1
7 201
1 1
3" / 12"
3" / 12"
3" / 12"
3" / 12"
3" / 12"
3" / 12"
3" / 12"
3" / 12"
13 (E) 1ST FLOOR 1
0' - 0"
(E) T.O. PLATE (1)
8' - 0"
T.O. ROOF
13' - 9 1/4"
1 A300
Grade
-0' - 6"
(N) T.O. PLATE (1)
9' - 0"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(N) T.O. PLATE (2)
19' - 0 3/4"
Ae Be C D E Fe Ge He
(E) 1ST FLOOR 2
0' - 6"
3' - 11 1/4" 9' - 0 3/4" 9' - 6" 1' - 0"
23' - 6"
105 106 103 104
4 5
4 9 2
4 SILL HT.
1' - 4" 5' - 6"
7' - 0" HEAD HEIGHT
5' - 6" SILL HT.
1' - 6"
6' - 10" HEAD HEIGHT
3 10
I
8 6
11 WOOD PLANK FENCING, SEE

LANDSCAPE DRAWINGS
13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
1/9/2025 2:55:55 PM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

EXTERIOR ELEVATIONS
A201
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
21 0
4 8 16
1/4"=1'-0"

ELEVATION NOTES

EXTERIOR FINISH SCHEDULE
1/4" = 1'-0" 1 NORTH
1/4" = 1'-0" 2 WEST
REV. NO. REVISION DATE
NOTE

NUMBER NOTE TEXT
1 1 5/8" THICK LIMESTONE VENEER BY "CREATIVE MINES" IN "CRAFT ORCHARD LIMESTONE - WILDFLOWER" FINISH
2 ALUMINUM-CLAD WOOD WINDOWS BY "JELD-WEN". EXTERIOR CLAD COLOR IN "CHESTNUT BRONZE" WITH DOUBLE PANE GLASS AND FULL SURROUND WOOD GRILLES.
2a WOODEN CUSTOM ENTRY DOOR WITH SIDELITE AND TRANSOM TO MATCH

WINDOW FINISH
3 BOARD AND BATTEN "HARDIE PANEL" BY "JAMES-HARDIE" IN SMOOTH FINISH.

PRIME AND PAINT "DUNN EDWARDS" "WARM WHITE DEW-380"
4 ENGINEERED POLYMER SYNTHETIC SLATE SHINGLE ROOF BY "DA VINCI" IN MULTI-WIDTH, COLOR "SLATE BLACK"
5 7/8"THK. MATCHING APPLIED EXTERIOR STUCCO BY "LA HABRA" - 20/30 CEMENT FLOAT FINISH. CONTRACTOR TO PREP STUCCO FOR PAINT APPLICATION. PAINT "DUNN EDWARDS" "MILK GLASS DEW 358"
6 ORNAMENTAL WOODEN MOULDINGS, TRIMS, CORBELS, FASCIA, ETC., COLOR BY DUNN EDWARDS ESPRESSO MACCHIATO DET680, SEE DETAILS FOR

DIMENSIONAL SPECIFICATIONS
7 CHESHIRE TALL 3/4 WALL LANTERN BY "CHAPAMN & MYERS" CHO2607

EXTERIOR WALL SCONCE
8 ALUMINUM GLASS PANEL GUARD RAIL BY "PEAK PRODUCTS" MODEL TYPE "PEAK MOUNTAINVIEW GLASS RAILING" IN BLACK
9 CORROSION RESISTANT WEEP SCREED BENEATH STUCCO, MINIMUM 4" ABOVE EARTH AND 2" ABOVE PAVED AREA
10 4" GUTTER 24GA ALUMINUM DOWN SPOUT, COLOR TO MATCH TRIM ELEMENTS 11 TRAFFIC COATING WATERPROOFING AT BALCONIES, OUTDOOR DECKS BY "DEX-O-TEX", MODEL LINE "DEX-FLEX" COLOR TO MATCH INETRIOR FLOOR FINISH
12 INSULATED SECTIONAL OVERHEAD GARAGE DOOR BY "Wayne-Dalton" MODEL "8680"
13 CUSTOM MATTE BLACK STAINLESS STEEL CHIMNEY CAP WITH CALIFORNIA EXHIBIT 3
206 of 348
(E) 1ST FLOOR 1
0' - 0"
(E) T.O. PLATE (1)
8' - 0"
T.O. ROOF
13' - 9 1/4"
2 A300
Grade
-0' - 6"
(N) T.O. PLATE (1)
9' - 0"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(N) T.O. PLATE (2)
19' - 0 3/4"
1 2e 3e 4 5 6e 7 8 9e
(E) 1ST FLOOR 2
0' - 6"
(N) 2ND FLOOR CLG
19' - 0"
4 4
4 9 2
5 5
102 103
108
104
201
205
105
2 4' - 0" 9' - 0" 1' - 0" 1' - 0" 7' - 6" 0' - 6" 0' - 6" 23' - 6" BUILDING HEIGHT
6' - 8" HEAD HT6' - 8" HEAD HT
3' - 4" SILL HT
6' - 10" HEAD HT
4' - 0" 3' - 0" SILL HT
6' - 10" HEAD HT
9 109
8 3
6 10
11 3
6 7' - 0" HEAD HT
13 1. EXTERIOR COLORS AND MATERIALS OF THE PROPOSED ADDITION INCLUDING WALLS, ROOFS,

AND WINDOWS MUST MATCH THE EXISTING STRUCTURES

2. 0.0 ELEVATION EQUALS MINIMUM 6 INCHES ABOVE LOWEST POINT AT SLOPED SURROUNDING GRADE.

3. CONTRACTOR SHALL INSTALL BUILDING MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
(E) 1ST FLOOR 1
0' - 0"
(E) T.O. PLATE (1)
8' - 0"
T.O. ROOF
13' - 9 1/4"
1 A300
Grade
-0' - 6"
(N) T.O. PLATE (1)
9' - 0"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(N) T.O. PLATE (2)
19' - 0 3/4"
He Ge Fe E D C Be Ae
(E) 1ST FLOOR 2
0' - 6"
(N) 2ND FLOOR CLG
19' - 0"
207
110
106
4 5
4 4
2 9
GAS
ELEC
PANEL
4' - 0" 3' - 2" SILL HT
7' - 2" HEAD HT
6' - 8" DOOR HT
2' - 8" 5' - 0" 3' - 0" 4' - 0" SILL HT 7' - 0" HEAD HT 5 9 9
2' - 0"
4' - 0" 9' - 0" 1' - 0" 1' - 0" 7' - 6" 0' - 6" 0' - 6" 23' - 6" BUILDING HEIGHT
I
206
3 6
111
1/4" = 1'-0" 1 SOUTH
1/4" = 1'-0" 2 EAST
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
1/9/2025 2:56:46 PM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

EXTERIOR ELEVATIONS
A202
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE

ELEVATION NOTES

EXTERIOR FINISH SCHEDULE
NOTE

NUMBER NOTE TEXT
1 1 5/8" THICK LIMESTONE VENEER BY "CREATIVE MINES" IN "CRAFT ORCHARD LIMESTONE - WILDFLOWER" FINISH
2 ALUMINUM-CLAD WOOD WINDOWS BY "JELD-WEN". EXTERIOR CLAD COLOR IN "CHESTNUT BRONZE" WITH DOUBLE PANE GLASS AND FULL SURROUND WOOD GRILLES.
2a WOODEN CUSTOM ENTRY DOOR WITH SIDELITE AND TRANSOM TO MATCH

WINDOW FINISH
3 BOARD AND BATTEN "HARDIE PANEL" BY "JAMES-HARDIE" IN SMOOTH FINISH.

PRIME AND PAINT "DUNN EDWARDS" "WARM WHITE DEW-380"
4 ENGINEERED POLYMER SYNTHETIC SLATE SHINGLE ROOF BY "DA VINCI" IN MULTI-WIDTH, COLOR "SLATE BLACK"
5 7/8"THK. MATCHING APPLIED EXTERIOR STUCCO BY "LA HABRA" - 20/30 CEMENT FLOAT FINISH. CONTRACTOR TO PREP STUCCO FOR PAINT APPLICATION. PAINT "DUNN EDWARDS" "MILK GLASS DEW 358"
6 ORNAMENTAL WOODEN MOULDINGS, TRIMS, CORBELS, FASCIA, ETC., COLOR BY DUNN EDWARDS ESPRESSO MACCHIATO DET680, SEE DETAILS FOR

DIMENSIONAL SPECIFICATIONS
7 CHESHIRE TALL 3/4 WALL LANTERN BY "CHAPAMN & MYERS" CHO2607

EXTERIOR WALL SCONCE
8 ALUMINUM GLASS PANEL GUARD RAIL BY "PEAK PRODUCTS" MODEL TYPE "PEAK MOUNTAINVIEW GLASS RAILING" IN BLACK
9 CORROSION RESISTANT WEEP SCREED BENEATH STUCCO, MINIMUM 4" ABOVE EARTH AND 2" ABOVE PAVED AREA
10 4" GUTTER 24GA ALUMINUM DOWN SPOUT, COLOR TO MATCH TRIM ELEMENTS 11 TRAFFIC COATING WATERPROOFING AT BALCONIES, OUTDOOR DECKS BY "DEX-O-TEX", MODEL LINE "DEX-FLEX" COLOR TO MATCH INETRIOR FLOOR FINISH
12 INSULATED SECTIONAL OVERHEAD GARAGE DOOR BY "Wayne-Dalton" MODEL "8680"
13 CUSTOM MATTE BLACK STAINLESS STEEL CHIMNEY CAP WITH CALIFORNIA 21 0
4 8 16
1/4"=1'-0"
EXHIBIT 3
207 of 348
(E) 1ST FLOOR 1
0' - 0"
(E) T.O. PLATE (1)
8' - 0"
1 A300
Grade
-0' - 6"
(N) T.O. PLATE (1)
9' - 0"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(N) T.O. PLATE (2)
19' - 0 3/4"
Ae Be C D E Fe Ge He
(E) 1ST FLOOR 2
0' - 6"
(N) 2ND FLOOR CLG
19' - 0"
I 4' - 0" 9' - 0" 9' - 6" 0' - 6" 0' - 6"
23' - 6"
189 SF
BED
272 SF
ENTRY
61 SF
HALL
287 SF

KITCHEN
42 SF
BATH
ATTIC
(E) 1ST FLOOR 1
0' - 0"
(E) T.O. PLATE (1)
8' - 0"
2 A300
Grade
-0' - 6"
(N) T.O. PLATE (1)
9' - 0"
(N) 2ND FLOOR
10' - 0"
(N) T.O. ROOF
23' - 0"
(N) T.O. PLATE (2)
19' - 0 3/4"
216 SF
BED
9e 8 7 6e 5 4 3e 2e 1
(E) 1ST FLOOR 2
0' - 6"
(N) 2ND FLOOR CLG
19' - 0"
0' - 6" 0' - 6" 9' - 6" 9' - 0" 4' - 0"
23' - 6"
189 SF
BED
277 SF
BED
92 SF
CLOSET
42 SF
PANTRY
287 SF

KITCHEN
467 SF
LIVING

ATTIC SPACE

ALIGN FLOOR LEVEL TO ELEVATED SLAB

CATHEDRAL CEILING BEHIND
1/4" = 1'-0" 2 CROSS SECTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:29:57 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

BUILDING SECTIONS
A300
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
1/4" = 1'-0" 1

LONGITUDINAL SECTION
1 2
0 4 8 16
1/4"=1'-0"
EXHIBIT 3
208 of 348
F.F.
201. 212
F.F.
103, 104, 101, 102

22.8 SF
CLEAR
2' - 8"

18.9 SF
CLEAR
105, 106 206, 207
101 102, 103 104 105 106, 120 112
2' - 8"
20 MIN
110, 111, 113, 114, 115,
116, 117, 118, 202, 203,
204, 205, 206, 207, 208,
209, 211
210
13' - 0" 5' - 0" 2' - 8"
107
109
8' - 6" 5' - 10"
7' - 0"
5' - 0"
4' - 0" 3' - 0"
3' - 0" 3' - 0" 5' - 0" 6' - 0" 2' - 0" 5' - 0" 3' - 6" 3' - 6" 3' - 0" 4' - 0" 3' - 0" 4' - 0"
109, 110 205
11 SF
CLEAR
201
2' - 6"
4' - 0" 3' - 0"
2' - 0"
4' - 0" 3' - 0"
3' - 9"
208, 209
14 SF
CLEAR
4' - 0" 3' - 0"
3' - 0"
202, 203, 204
5' - 0"
3' - 6" 3' - 6"
107, 108
11 SF
CLEAR 14 SF
CLEAR

16.5 SF
CLEAR

16.5 SF
CLEAR
108
7'-10"
7'-0"7'-0"
15'-8"
7'-0"
6'-8"
8'-9"
5'-6"
7'-0"
3'-0"
3'-0"

1. ALL DOORS AND WINDOWS SHALL MEET CITY OF GLENDALE'S SECURITY ORDINANCE (A101.2)

2. UNLESS NOTED OTHERWISE, DOORS AND OPENINGS NOT LOCATED BY DIMENSIONS SHALL BE CENTERED ON WALL OR SHALL BE LOCATED 6" FROM FINISH WALL TO EDGE OR BACK OF DOOR.

3. INSTALL DOORS AND FRAMES BLUMB, STRAIGHT, IN TRUE ALIGNMENT AND RIGIDLY SECURED TO WALLS. ERECT IN PROPER SEQUENCE WITH WORK OF OTHER TRADES.

4. SPECIAL LOCKING DEVICES IF SPECIFIED SHALL BE OF A CITY APPROVED TYPE.

5. INSTALLATION OF GLASS SHAL CONFORM TO FEDERAL SPECIFICATION 16-CFR-1202 AND THE C.B.C. AND ALL LOCAL CODES AND ORDINANCES. SAFETY GLAZING IN HAZARDOUS LOCATIONS SHALL CONFORM TO C.B.C. SECTION 2406.

6. ALL DOOR AND OPERABLE WINDOWS TO BE COMPLETELY WEATHER-STRIPPED. INCLUDING ROLL-UP TRUCK DOORS.

7. ALL MANUFACTURED WINDOW AND DOOR UNITS SHALL BE LABELED AS MEETING ANSI STANDARD FOR AIR INFILTRATION.

8. INSULATION MATERIAL SHALL MEET THE MINIMUM INFILTRATION REQUIREMENTS PER SECTION 2.5312 B.E.E.S. - MOST CURRENT EDITION.

9. DOORS AND WINDOWS SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS OF SECTION 2.5317 B.E.E.S. - MOST CURRENT EDITION.

10. DOOR OPENING IN MASONRY WALLS SHALL BE 4" HORIZONTAL AND 2" VERTICAL LARGER THAN DOOR DIMENSION TO PROVIDE FOR METAL DOOR FRAME.

11. ALL DOORS AND WINDOWS DIMENSIONS ARE CLEAR OPENING DIMENSIONS.

12. INSTALL ICE & WATER SHIELD @ EXTERIOR WINDOWS BY W.I. GRACE CO. AT WINDOW HEAD: INSTALL SHIELD UNDER BUILDING PAPER.

13. USE FIBERGLASS EXTERIOR DOORS AND WINDOWS BY "MILGARD" OR APPROBED EQUAL, U-FACTOR = 0.34, SHGC = 0.28

14. THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE PERSON RESPONSIBLE FOR THE

INSTALLATION OF REGULATED MANUGACTURED DEVICES SHALL POST, OR MAKE AVAILABLE

15. ONLY EXTERNAL GRIDS ALLOWED, EITHER SDL OR SIMULATED DIVIDED LIGHTS, NO INTERNAL GRIDS ALLOWED. 106
108 107
105
106
118
116
113
114 115
111
110
117
112
104
101
103
102 101
105
110
108
103
104
102
109
120
111
208
207
206
205
209 211
204
203
202
210
201
205
207
209 208
206
201
212
5' - 6"

EQ EQ EQ

EQ EQ EQ EQ
9'-4"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:30:39 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

DOOR AND WINDOW SCHEDULES
A401
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
REV. NO. REVISION DATE
1/4" = 1'-0"

DOOR AND WINDOW ELEVATION TYPE

DOOR SCHEDULE DOOR AND WINDOW GENERAL NOTES
DOOR
NO.

EXT/
INT

DOOR FRAME GLAZING OTHER ITEMS

REMARKS
SIZE
WIDTH HEIGHT THICKNESS OPERATION CONSTR. MATERIAL FINISH MATERIAL FINISH TYPE COLOR CLOSER F.R. 101 EXT 3' - 0" 7' - 0" 0' - 1 3/4" SWING SOLID CORE WOOD/GLASS F.F./PAINT WOOD F.F./PAINT DOUBLE GLASS, TEMPERED OBSCURE - NR ENTRY DOOR 102 EXT 10' - 0" 6' - 10" 0' - 1 3/4" SLIDING (STACKED) WOOD CLAD ALUM/WOOD/GLASS F.F./PAINT WOOD F.F./PAINT DOUBLE GLASS, TEMPERED CLEAR - NR 103 EXT 10' - 0" 6' - 10" 0' - 1 3/4" SLIDING (STACKED) WOOD CLAD ALUM/WOOD/GLASS F.F./PAINT WOOD F.F./PAINT DOUBLE GLASS, TEMPERED CLEAR - NR 104 EXT 2' - 8" 6' - 8" 0' - 1 3/8" SWING SOLID CORE WOOD PAINT WOOD PAINT - - - NR 105 EXT 5' - 0" 6' - 8" 0' - 1 3/4" SLIDING (STACKED) ALUM. ALUM/GLASS F.F./PAINT ALUM. F.F./PAINT DOUBLE GLASS, TEMPERED CLEAR - NR 106 EXT 2' - 8" 6' - 8" 0' - 1 3/8" SWING SOLID CORE WOOD PAINT WOOD PAINT - - - NR 107 EXT 7' - 8" 7' - 0" 0' - 1 1/2" SECTIONAL GARAGE DOOR ALUM. ALUM/GLASS F.F. WOOD PAINT TEMPERED OBSCURE NR INSULATED 108 EXT 15' - 6" 7' - 0" 0' - 1 1/2" SECTIONAL GARAGE DOOR ALUM. ALUM/GLASS F.F. WOOD PAINT TEMPERED OBSCURE NR INSULATED 110 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 111 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 112 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING SOLID CORE WOOD PAINT WOOD PAINT - - Y 20 MIN GARAGE DOOR 113 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 114 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 115 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 116 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 117 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 118 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 120 EXT 2' - 8" 6' - 8" 0' - 1 3/8" SWING SOLID CORE WOOD PAINT WOOD PAINT - - - NR 201 EXT 8' - 6" 6' - 10" 0' - 1 3/4" SLIDING (STACKED) WOOD CLAD ALUM/WOOD/GLASS F.F./PAINT WOOD F.F./PAINT DOUBLE GLASS, TEMPERED CLEAR - NR 202 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 203 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 204 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 205 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 206 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 207 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 208 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 209 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 210 INT 5' - 10" 6' - 8" 0' - 1 3/4" SLIDING, BI-PASS HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 211 INT 2' - 8" 6' - 8" 0' - 1 3/8" SWING HOLLOW CORE WOOD PAINT WOOD PAINT - - - NR 212 INT 8' - 6" 6' - 10" 0' - 1 3/4" SLIDING (STACKED) WOOD CLAD ALUM/WOOD/GLASS F.F./PAINT WOOD F.F./PAINT DOUBLE GLASS, TEMPERED CLEAR - NR

WINDOW SCHEDULE (GLENDALE)
WINDO
W NO. Head Height WIDTH HEIGHT MATERIAL

VISIBLE FROM
STREET OPERATION FRAME TYPE Grid
KEEP EX.

SILL/FRAME

BUILD NEW

SILL/FRAME

EXISTING
EDGE
DETAIL

NEW EDGE
DETAIL
BED
ROOM
ENERGY

EFFECIENT TEMPERED

OTHER GLAZING DETAIL OTHER

REMARKS
FIRE
HAZARD
ZONE
18" OF

FLOOR OR
40" OF DOOR TYPE COLOR JAMB HEAD SILL SILL HEIGHT U-VALUE SHGC 101 7' - 0" 5' - 0" 3' - 6" ALUM. CLAD WOOD Yes CASEMENT NAIL IN Yes Yes No FLAT WD FLAT WD No Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 3' - 6" 0.3000 0.23 102 7' - 0" 5' - 0" 3' - 6" ALUM. CLAD WOOD Yes CASEMENT NAIL IN Yes No FLAT WD FLAT WD No Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 3' - 6" 0.3000 0.23 103 7' - 0" 3' - 0" 5' - 6" ALUM. CLAD WOOD No CASEMENT NAIL IN Yes Yes FLAT WD No Yes Yes Yes Yes DOUBLE GLASS/TEMPERED CLEAR 8/A501 8/A501 8/A501 1' - 6" 0.3000 0.23 104 7' - 0" 3' - 0" 5' - 6" ALUM. CLAD WOOD No CASEMENT NAIL IN Yes Yes FLAT WD No Yes Yes Yes Yes DOUBLE GLASS/TEMPERED CLEAR 8/A501 8/A501 8/A501 1' - 6" 0.3000 0.23 105 6' - 10" 3' - 0" 5' - 6" ALUM. CLAD WOOD No CASEMENT NAIL IN Yes Yes FLAT WD No Yes Yes Yes Yes DOUBLE GLASS/TEMPERED CLEAR 8/A501 8/A501 8/A501 1' - 4" 0.3000 0.23 106 6' - 10" 3' - 0" 5' - 6" ALUM. CLAD WOOD No CASEMENT NAIL IN Yes Yes FLAT WD No Yes Yes Yes Yes DOUBLE GLASS/TEMPERED CLEAR 8/A501 8/A501 8/A501 1' - 4" 0.3000 0.23 108 6' - 10" 8' - 0" 3' - 6" ALUM. CLAD WOOD No SLIDING NAIL IN Yes Yes FLAT WD No Yes No Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 3' - 4" 0.3000 0.23 109 6' - 8" 6' - 0" 4' - 0" ALUM. CLAD WOOD No SLIDING NAIL IN Yes Yes FLAT WD Yes Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 2' - 8" 0.3000 0.23 EGRESS 110 6' - 8" 5' - 0" 4' - 0" ALUM. CLAD WOOD No CASEMENT NAIL IN Yes Yes FLAT WD Yes Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 2' - 8" 0.3000 0.23 EGRESS 111 6' - 8" 2' - 0" 3' - 0" ALUM. CLAD WOOD No SINGLE HUNG NAIL IN Yes Yes FLAT WD No Yes Yes DOUBLE GLASS OBSCURE 8/A501 8/A501 8/A501 3' - 8" 0.3000 0.23 201 -36' - 1 5/16" 5' - 6" 9' - 4" ALUM. CLAD WOOD Yes FIXED NAIL IN Yes Yes FLAT WD No Yes Yes Yes DOUBLE GLASS/TEMPERED CLEAR 8/A501 8/A501 8/A501 -45' - 5 5/16" 0.3000 0.23 205 7' - 0" 6' - 0" 4' - 0" ALUM. CLAD WOOD No SLIDING NAIL IN Yes Yes FLAT WD No Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 3' - 0" 0.3000 0.23 206 7' - 0" 2' - 0" 3' - 0" ALUM. CLAD WOOD No SINGLE HUNG NAIL IN Yes Yes FLAT WD No Yes Yes DOUBLE GLASS OBSCURE 8/A501 8/A501 8/A501 4' - 0" 0.3000 0.23 207 7' - 0" 2' - 0" 3' - 0" ALUM. CLAD WOOD No SINGLE HUNG NAIL IN Yes Yes FLAT WD No Yes Yes DOUBLE GLASS OBSCURE 8/A501 8/A501 8/A501 4' - 0" 0.3000 0.23 208 7' - 0" 3' - 9" 4' - 0" ALUM. CLAD WOOD Yes CASEMENT NAIL IN Yes Yes FLAT WD Yes Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 3' - 0" 0.3000 0.23 EGRESS 209 7' - 0" 3' - 9" 4' - 0" ALUM. CLAD WOOD Yes CASEMENT NAIL IN Yes Yes FLAT WD Yes Yes Yes DOUBLE GLASS CLEAR 8/A501 8/A501 8/A501 3' - 0" 0.3000 0.23 EGRESS 3/32" = 1'-0" 1
(N) FIRST FLOOR DOOR AND WINDOW KEYPLAN
3/32" = 1'-0" 2
(N) 2ND FLOOR DOOR AND WINDOW KEYPLAN
0' - 0"
13' - 9" EXHIBIT 3
209 of 348

SELF-ADHERED FLEXIBLE FLASHING
3'-0"
4"
CLASS "A" COMP. ASPHALT
SHINGLE ROOF PER FIN.

LEGEND
DOUBLE LAYERED 30# ASPHALT

SATURATED FELT WATER RESISTIVE

MEMBRANE LAPPED OVER METAL

FLASHING
26GA METAL FLASHING W/
HEMMED DRIP EDGE (LAP BLDG.

PAPER OVER DRIP EDGE)

INTERIOR DRYWALL AS SPECIFIED

IN WALL TYPE SCHEDULE
24GA ALUMINUM GUTTER AND

DOWNSPOUT (SIZE PER
SMACNA ROOF CALC.)

INTERIOR EXTERIOR
2x ROOF FRAMING (SEE STRUCTURAL
DWG'S FOR MORE INFO.)

SELF-ADHERING FLEXIBLE FLASHING MEMBRANE
BELOW METAL FLASHING. LAP BUILDING PAPER OVER
FLEXIBLE FLASHING THE REQUIRED MIN. PER

MANUFACTURER
FIBERGLASS INSULATION PER TITLE 24
2x WALL FRAMING (SEE STRUCTURAL
DWG'S FOR MOR INFO.)
T.O. DBL. PLATE

SEE ELEVATIONS

SEE ROOF PLAN

EAVE VARIES
7/8" CEMENT PLASTER OVER

METAL LATH, OVER WATER

RESISTIVE BARRIER, OVER

EXTERIOR GRADE PLYWOOD
2x CONT. WOOD FASCIA BOARD
WITH OPTIONAL 1x SACRIFICIAL

BOARD UNDER GUTTER TO CAP

RAFTER TAIL
NOTE: ROOF SLOPE VARIES, SEE ELEVATION

EXTERIOR GRADE ROOF

SHEATHING

ROOF FRAMING PER

STRUCTURAL DWGS
NOTE: PENETRATIONS THROUGH
METAL VALLEY NOT PERMITTED.

FIBERGLASS

INSULATION PER
TITLE 24
26GA GALV. STEEL VALLEY

FLASHING

OR APPROVED EQUAL

FLASHING LINING FROM CRC
R905.2.8.2
CLEAT AS REQ'D.

SELF-ADHERING FLEXIBLE FLASHING
MEMBRANE BELOW METAL FLASHING. LAP

BUILDING PAPER OVER FLEXIBLE
FLASHING THE REQUIRED MIN. PER

MANUFACTURER
DOUBLE LAYERED 30# ASPHALT

SATURATED FELT WATER RESISTIVE

MEMBRANE LAPPED OVER METAL

FLASHING
CLASS "A" COMP. ASPHALT
SHINGLE ROOF PER FIN.

LEGEND
MIN. 12" 8"

EXTERIOR GRADE ROOF

SHEATHING

ROOF FRAMING PER

STRUCTURAL DWGS
26GA GALV. STEEL VALLEY

FLASHING

OR APPROVED EQUAL FLASHING
LINING FROM CRC R905.2.8.2
CLASS "A" COMP. ASPHALT
SHINGLE ROOF PER FIN.

LEGEND
NOTE: PENETRATIONS THROUGH
METAL VALLEY NOT PERMITTED.

REINFORCE SLOPE TRANSITION W/ SELFADHERING FLEXIBLE FLASHING MEMBRANE BELOW METAL FLASHING. LAP FLASHING

OVER BUILDING PAPER AT VERTICAL

TRANSITION

FIBERGLASS

INSULATION PER
TITLE 24
24 INCHES MIN.

DOUBLE LAYERED 30# ASPHALT

SATURATED FELT WATER RESISTIVE

MEMBRANE LAPPED OVER METAL

FLASHING
8"
CONTINUOUS 3/4" BACK DAM

BLOCKING INBOARD OF INTERIOR
EDGE
MIN. 1/8" SHIM SPACER, MIN. 2%

SLOPE AT SILL FRAME

FLEXIBLE MEMBRANE PAN

FLASHING RETURN OVER BACK
DAM. PROVIDE CONTINUOUS

INTERIOR PERIMETER SEALANT
JOINT

DO NOT SEAL OR CAULK

SILLL, ALLOW WATER TO

DRAIN FROM SILL PAN

INTERIOR DECORATIVE CASING

WINDOW PER SCHEDULE
SEE WIN. SCHEDULE
R.O.

EXTERIOR INTERIOR
7/8" CEMENT PLASTER OVER

METAL LATH, OVER WATER

RESISTIVE BARRIER, OVER

EXTERIOR GRADE PLYWOOD
STRUCTURAL HEADER (SEE ST.

DWG'S)

BASE LAYER OF WATER

RESISTIVE BARRIER

UNDERNEATH FLEXIBLE FLASHING

MEMBRANE

WATER RESISTIVE

BARRIER OVER FLEXIBLE

MEMBRANE FLASHING
26GA GALV. METAL HEAD
FLASHING W/ DRIP EDGE.

DECORATIVE FLAT WOOD
TRIM

FULL INTERIOR PERIMETER

SEALANT JOINT

BASE LAYER OF FLEXIBLE

FLASHING MEMBRANE

SELF-ADHERED FLEXIBLE

MEMBRANE FLASHING AT HEAD

FULL INTERIOR PERIMETER

SEALANT JOINT

INTERIOR DECORATIVE CASING
7/8" CEMENT PLASTER OVER

METAL LATH, OVER WATER

RESISTIVE BARRIER, OVER

EXTERIOR GRADE PLYWOOD

BASE LAYER OF SELF-ADHERED

FLEXIBLE FASHING TURNED INTO

WINDOW POCKET

SELF-ADHERED FLEXIBLE
FLASHING OVER WIN. FLANGE AT
JAMB
SEE WIN. SCHEDULE
R.O.

EXTERIOR

INTERIOR
2x FRAMING SEE STRUCTURAL
DWG'S

FIBERGLASS INSULATION
(SEE TITLE 24)
MIN. 1/8" SHIM SPACER (TYP)

DECORATIVE FLAT WOOD TRIM
JAMB

HEAD/SILL

WATER RESISTIVE BARRIER

ROOF FRAMING PER

STRUCTURAL

WATER RESISTIVE
MEMBRANE, 30# FELT
DOUBLE LAPPED MIN. (OR

APPROVED EQUAL)
CLASS "A" COMP.

SHINGLE COOL ROOF

PER FINISH LEGEND

EXTRUDED POLYSTYRENE

FOAM ATTIC VENTIALATION
CHANNELS WITH 1.5" MIN
AIR GAP. DIMENSION TO FIT
WITHIN 16"o.c. ROOF JOISTS

RIDGE BEAM PER

STRUCTURAL

ROLL ON

NONCOMBUSTIBLE

CLASS A RIDGE VENT,

INSTALL PER

MANUFACTURER'S

INSTRUCTIONS

CONTINUOUS PATH

OF AIR FLOW FROM

EAVE TO RIDGE VENT

ROOF SHEATHING,

PER STRUCTURAL
MAINTAIN 2" WIDE GAP
AT PLYWOOD AT EVERY 12".

LEAVE 1" AREA UNCUT AT
INTERVALS OF 12"

FIBERGLASS
INSULATION PER T24
CLASS "A" COOL ROOF

RIDGE CAP

CONTINUOUS ALUMINUM Z
FLASHING, 3" MIN. OVERLAP

AT ENDS

BALCONY/DECK DOOR (SEE DOOR

SCHEDULE FOR MORE

INFORMATION)

DOOR SILL FRAME AS SCHEDULED

EXTERIOR GRADE SUBFLOOR

SHEATHING
2x CONTINUOUS

BLOCKING

INTERIOR EXTERIOR
NOTE: SEE STRUCTURAL DRAWINGS FOR STRUCTURAL MEMBER SIZES AND CONNECTIONS 4"
1 1/2"
DOOR WIDTH (SEE SCHED.)
24GA G.I. METAL SILL PAN WITH

UPTURNED LEGS SET IN FULL

BED OF SEALANT PROVIDE
END DAMS TYP.
1/4"
INTERIOR FIN. FLOORING

BACKER ROD/SEAL

STRUCTURAL FRAMING
SLOPE MIN. 1/4":12"

MULTI-COAT DECK

WATERPROOFING MEMBERANE
(SEE FINISH LEGEND), INSTALL PER
MANUFACTURER INSTRUCTIONS.

SLOPE MIN. 1/4":12"
24GA G.I. DIATO SHEET METAL
FLASHING NAILED AT 3"O.C., ALL
SEAMS TO OVERLAP MIN. 3"
7/8" CEMENT PLASTER OVER
METAL LATH TYP. (SEE FINISH

LEGEND)

EXTERIOR GRADE PLYWOOD

SHEATHING (SEE STRUCTURAL
DWG'S)

FIBERGLASS INSULATION (SEE
TITLE 24)

MULTI-COAT DECK

WATERPROOFING MEMBERANE
(SEE FINISH LEGEND), INSTALL PER
MANUFACTURER INSTRUCTIONS.

MIN.
3"

CONTINUOUS WATER-RESISTIVE
BARRIER, MIN 15# ASPHALT

FELT, DOUBLE LAPPED,
COMPLYING WITH ASTM D226,
TYPE 1
4"
5 3/4"
3"
3"

REINFORCE WALL TO FLOOR

TRANSITION W/ SELF-ADHERING

FLEXIBLE FLASHING MEMBRANE

BELOW METAL FLASHING

CONTINUOUS BED OF SEALANT AT
ENDS (TYP.)
(BUILDING SUBSTRUCTURE)

PLYWOOD SHEATHING

WHERE OCCURS (SEE

STRUCTURAL DWG'S)
7/8" STUCCO (TYP.)

WATERPROOFING

UNDERLAYMENT
NO.26 GA. SHEET WEEP
SCREED0' - 4"
MIN. MIN.
4"
SLOPE 2%

FINISHED PAVED AREA

FINISH GRADE
MIN.
2"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
C
A
B
D
E
F
G
H
J
K
L
M
N
O
P
Q
CONTRACTOR TO VERIFY ALL DIMENSIONS, CONDITIONS, ETC., PRETAINING TO THE PROJECT AT THE SITE BEFORE PROCEEDING

AS INSTRUMENTS OF SERVICE, ALL DESIGN, IDEAS AND

INFORMATION SHOW ON THESE DRAWINGS AREA AND SHALL
REMAIN THE PROPERTY OF ECUMENA DESIGN STUDIO. NO PART

THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED

IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN

THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN

PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF

ECUMENA DESIGN STUDIO VISUAL CONTACT WITH THESE

DRAWINGS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF
ACCEPTANCE OF THESE RESTRICTIONS.
3786 LA CRESCENTA AVE., SUITE 201
GLENDALE, CA 91208
TEL.: 818.507.6787
PROJECT TITLE :

JOB ADDRESS :

OWNER :

JOB NO. :

DRAWN BY :

CHECKED BY :

DATE :

SHEET DESCRIPTION :

SHEET NUMBER :

SHEETS OF
NO. ISSUED FOR: DATE:
1 2
3 4
5 6
7 8
11/26/2024 10:31:07 AM
906 WHITEHAVEN 2ND

FLOOR ADDITION
906 Whitehaven Terrace,
Glendale, CA 91207
MR. MIKE MAZMANIAN

DETAILS
A501
CA
HA
PLANNING SUBMITTAL (DRAFT) 07/24/2024
1" = 1'-0" 3 ROOF EAVE1" = 1'-0" 9 ROOF VALLEY1" = 1'-0" 6 ROOF VALLEY FLASHING REV. NO. REVISION DATE
1 1/2" = 1'-0" 8 EDS_WIN NAIL-ON FLAT TRIM DTL TYP1 1/2" = 1'-0" 1 ROOF RIDGE VENTILATED 3" = 1'-0" 2 BALCONY DOOR SILL DETAIL3" = 1'-0" 4 WALL BASE AT BALCONY3" = 1'-0" 5 WEEP SCREED DETAIL EXHIBIT 3
210 of 348
PC
PC
PC
PC
PC
PC
B1 B1 B1 B1 B1
B1
B1
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
B1
B1
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC

M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M RI
RI
RI
RI
RI
RI
RI
KR
KR
KR
KR
KR
KR
KR
KR
KR
KR

KR LC LC LC
LC
LC
LC
LC
LC
LC
LC
LV
LV
LV LV
LV LV
LO
LO
LO
LO
LO
LO
LO
LO

YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP

LV LV LV LV LV
LV
LV

LV LV LV LV LV LV
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA

SA SA SA SA SA SA SA
GB
GB
GB
GB
GB
GB
GB
GB

GB GB GB GB
GB
GB
GB
GB
GB
GB
GB
GB
GB
B1 B1 B1 B1 B1 B1 B1 B1
B1
B1
B1 B1
B1

HY HY HY

HY HY HY
LC
KR
KR
KR
KR
KR
LC
LC
LC
GB
GB
GB
GB
GB
GB
GB
GB
LO
LO
LO

LO LO LO

LO LO LO
LO
LO

LO LO LO

LO LO LO

RP RP RP
RP

RP RP RP
RP
RP RP
RP

RP RP RP
RP
RP

RI RI RI RI
B1 B1 B1 B1
SA
SA
SA
SA
SA

SA SA SA SA SA SA SA

WHITEHAVEN TERRACE

STATEMENT OF COMPLIANCE

THE DESIGN OF THIS PROJECT COMPLIES WITH THE REQUIREMENTS OF THE CITY OF GLENDALE, CA.

I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS.

THE LANDSCAPING AND IRRIGATION WILL BE INSPECTED AND CERTIFIED IN

WRITING, WITH A CERTIFICATE OF SUBSTANTIAL COMPLETION, BY THE PROJECT

LANDSCAPE ARCHITECT, RYAN DRNEK, THAT THE INSTALLATION SUBSTANTIALLY

CONFORMS TO THE APPROVED PLAN PRIOR TO A FINAL LANDSCAPE INSPECTION OR OCCUPANCY BEING REQUESTED.

I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT

LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE
DOCUMENTATION PACKAGE.

12.17.2024
SIGNATURE DATE SCALE: 3/16” = 1’-0” NORTH
0' 5' 10' 15’ 20'
12:20 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

PROJECT LOCATION

PROJECT INFORMATION
OWNERS
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]

PROJECT LOCATION
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
APN: 5649-006-014
TRACT: 21941
LOT: 48
ZONE: R1R III
LOT AREA: 11,770 S.F.

LANDSCAPE ARCHITECT

SODDER STUDIO
12405 VENICE BLVD. #275
LOS ANGELES, CA 90066
P. 310.795.7994
E. [email protected]

SCOPE OF WORK

THIS PROJECT WILL COMPLETELY RENOVATE THE EXISTING LANDSCAPE OF A SINGLE FAMILY HOME IN GLENDALE, CALIFORNIA.

THE SCOPE OF WORK WILL INCLUDE DEMOLITION, GRADING AND DRAINAGE IMPROVEMENTS PRIOR TO INSTALLATION OF THE NEW LANDSCAPE.

SEE THE ARCHITECT AND ENGINEER'S DRAWINGS.

LANDSCAPE CONSTRUCTION WILL INCLUDE WALLS, FENCES, CURBS, DRIVEWAY

PAVING, WALKWAY PAVING, STEPS, LANDINGS, FIRE PIT, OUTDOOR DINING COUNTER WITH APPLIANCES, PLANTERS AND HEADERBOARD.

INSTALLATION OF A NEW IRRIGATION SYSTEM, TREES, SHRUBS, GROUNDCOVERS, MULCH, CONTAINERS AND LOW VOLTAGE LIGHTING.

POOL, SPA AND HANDRAIL DESIGNS ARE TO BE SUPPLIED BY OTHERS.

THE CONTRACTOR IS TO VERIFY THE SCOPE OF WORK AND NOTIFY THE OWNER OF

ANY PROPOSED CHANGES OR ADDITIONAL WORK REQUIRED FOR PROJECT COMPLETION.

LANDSCAPE CONCEPT PLAN
(E) WALLS WITH NEW STUCCO FINISH

LANDSCAPE DESIGN
BGLA

BRYAN GARRENE, LANDSCAPE ARCHITECT
P. 310.701.6989
E. [email protected]

ARCHITECT
HAROUT AKOPIAN C-37146
3786 LA CRESCENTA AVE. UNIT 201
GLENDALE, CA 91208
P. 818.818.9636
E. [email protected]

STRUCTURAL ENGINEER

ARMEN MARTIROSSYAN

ARPA TECHNOLOGY GROUP
635 N. COLORADO BLVD.

GLENDALE, CA 91204
P. 818.434.1708
E. [email protected]

LOMPOC COBBLESTONE
36" BOX FRUITLESS OLIVE TREE

ENTRY WALK WITH LIMESTONE

PAVING AND STEPS

BOXWOOD GLOBES

CONCRETE

STEPPING STONE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

TURF EDGE
LAWN

CONCRETE DRIVEWAY
72" BOX OLIVE TREE
LAWN
SPA
47 S.F.

POOL
370 S.F.
36" BOX FRUITLESS OLIVE TREE

PASS THRU COUNTER
6'-0" TALL SIDE YARD

FENCE AND GATE
24" BOX FRUITLESS OLIVE TREE
LAWN

DECORATIVE POT

DECORATIVE POT

TRASH AREA WITH CONCRETE PAVING
6'-0" TALL WOOD GATE AT SIDE YARD

EXISTING PROPERTY LINE WALL & COLUMNS

CONCRETE STEPPING STONES

OUTDOOR KITCHEN WITH APPLIANCES
24" BOX FRUITLESS OLIVE TREE

EXISTING TREES TO REMAIN

EXISTING LANDSCAPE TO REMAIN

PLANTER WALL WITH BENCH SEAT

FIRE PIT WITH LAVA ROCK AND FIRE BALLS

LIMESTONE PAVING

CONCRETE PAVING

RETAINING WALL

LIMESTONE PAVING

SITE INFORMATION
DESCRIPTION AREA % SITE
TOTAL SITE 11,770 S.F.

RESIDENCE 3,593 S.F. 30.5%
HARDSCAPE 2,971 S.F. 25%
POOL 421 S.F. 3.5%
PLANTING AREA 5,251 S.F. 44.6%

RETAINING WALL WITH GLASS RAILING
STEPS
STEP
STEP
STEP
STEP

OUTDOOR SHOWER

WHITEHAVEN TERRACE

OLD PHILLIPS RD

GREENBRIAR RD

LANDSCAPE

TITLE SHEET
L0.01
01 OF 13
EXHIBIT 3
211 of 348
12:20 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

GENERAL
NOTES
L0.02
02 OF 13
I. CONTRACTOR'S CONSTRUCTION WORK RESPONSIBILITIES:

A. SCOPE OF WORK: THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION AND

SERVICES NECESSARY TO FURNISH AND INSTALL ALL CONSTRUCTION ELEMENTS AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN.

B. CONFORMANCE: ALL CONSTRUCTION WORK SHALL CONFORM TO APPLICABLE LOCAL, COUNTY AND/ OR STATE CODES, REGULATIONS AND RULES.

C. LICENSE: ALL WORK SHALL BE PERFORMED BY A CALIFORNIA LICENSED CONTRACTOR.

D. PERMITS AND INSPECTIONS: THE CONTRACTOR SHALL OBTAIN, COORDINATE AND PAY FOR ANY AND ALL PERMITS, FEES AND AGENCY INSPECTIONS AS REQUIRED.

E. INSURANCE: THE CONTRACTOR SHALL CARRY ALL WORKMAN’S COMPENSATION, PUBLIC LIABILITY AND

PROPERTY DAMAGE INSURANCE AS REQUIRED BY ALL APPLICABLE CODES, REGULATIONS AND THE OWNER (JOB SUPERINTENDENT).

F. SITE VERIFICATION: PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY, AT THE

JOB SITE, ALL CONDITIONS AND DIMENSIONS SHOWN ON THE PLANS AFFECTING THE INTENDED DESIGN OF THE LANDSCAPE WORK. ANY DISCREPANCIES SHALL BE REPORTED TO OWNER (JOB SUPERINTENDENT) IMMEDIATELY.

G. LIABLE FOR ENCROACHMENT: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ENCROACHMENT

ONTO ADJACENT PROPERTY, RIGHT-OF-WAYS, EASEMENTS, SET-BACKS OR ANY OTHER LEGAL PROPERTY RESTRICTIONS EITHER MARKED OR UNMARKED.

H. COORDINATION OF ACTIVITIES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF HIS ACTIVITIES WITH ALL OTHER TRADES THROUGH THE OWNER (JOB SUPERINTENDENT).

I. FIELD STAKING: PRIOR TO INSTALLATION, THE CONTRACTOR SHALL LOCATE BY STAKES, OR OTHER MEANS,

ALL CONSTRUCTION ELEMENTS AS DELINEATED ON THE PLANS FOR APPROVAL BY THE POWER AND/OR LANDSCAPE ARCHITECT.

J. NOTIFICATION OF DESCREPANCIES: ANY DISCREPANCIES BETWEEN THE FIELD CONDITIONS AND THE

CONTRACT DOCUMENTS AND/OR THE DESIGN INTENT AFFECTING THE CONTRACT DOCUMENTS AND/OR THE

DESIGN INTENT AFFECTING THE SUCCESSFUL COMPLETION AND COST OF THE PROJECT SHALL BE REPORTED TO THE OWNER AND LANDSCAPE ARCHITECT IMMEDIATELY. ALL WORK RELATED TO THE PROBLEM AREA

SHALL CEASE UNTIL THE DISCREPANCIES HAVE BEEN RESOLVED BY THE OWNER OR LANDSCAPE ARCHITECT IN WRITING. ANY CONTINUATION OF WORK PRIOR TO THE RESOLUTION OF DISCREPANCIES IS AT THE CONTRACTOR’S RISK AND EXPENSE.

K. LIABLE FOR DAMAGE: THE CONTRACTOR SHALL BE LIABLE FOR DAMAGE TO ALL UTILITIES, CONSTRUCTION,

IRRIGATION AND PLANTING ELEMENTS, EXISTING OR NEW, MARKED OR UNMARKED, AND SHALL REPAIR OR REPLACE ANY DAMAGED IMPROVEMENTS IN A MANNER ACCEPTABLE TO THE OWNER.

L. LIABLE FOR LOSS: THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY LOSS TO HIS EQUIPMENT,

PARTS AND MATERIALS ON THIS PROJECT UNTIL COMPLETION AND ACCEPTANCE OF THE JOB IN WRITING BY THE OWNER.

N. WRITTEN CERTIFICATION: THE CONTRACTOR SHALL PROVIDE A WRITTEN CERTIFICATION THAT THE CONSTRUCTION WORK IS INSTALLED IN FULL COMPLIANCE WITH THE CONTRACT DOCUMENTS. ANY APPROVED SUBSTITUTIONS OR DEVIATIONS FROM THE PLANS OR SPECIFICATIONS SHALL BE NOTED. THIS CERTIFICATION SHALL BE ON THE CONTRACTOR’S LETTERHEAD WITH HIS SIGNATURE AND CALIFORNIA CONTRACTOR’S LICENSE NUMBER.

II. OWNER’S CONSTRUCTION WORK RESPONSIBILITY
A. CONSTRUCTION RESPONSIBILITIES: THE OWNER WILL BE DIRECTLY RESPONSIBLE FOR ALL ASPECTS OF CONSTRUCTION INCLUDING ALL CONSTRUCTION INSPECTIONS. ALL FIELD MEETINGS SHALL BE INITIATED BY

THE CONTRACTOR AND COORDINATED THROUGH THE OWNER (JOB SUPERINTENDENT) TO THE LANDSCAPE ARCHITECT. THE LANDSCAPE ARCHITECT SHALL BE IN A SUPPORT OBSERVATION ROLE TO THE OWNER PROVIDING INTERPRETIVE ADVICE ONLY IN ACCORDANCE WITH THE OBSERVATION SCHEDULE AS NOTED.

B. DETERMINING LEGAL AND PHYSICAL ELEMENTS: OWNER SHAL BE RESPONSIBLE FOR DETERMINING

PROPERTY LINES, RIGHT-OF-WAYS, TRACT BOUNDARIES, GRADES, EASEMENTS, UTILITY LOCATIONS (ABOVE

AND BELOW GRADE) ANY OTHER LEGAL OR PHYSICAL ELEMENTS, AS REQUIRED, FOR THE SUCCESSFUL COMPLETION OF THE WORK. CONTRACTOR SHALL NOT BE PERMITTED TO PROCEED WITH ANY WORK WITHOUT DETERMINATION OF THE ABOVE INFORMATION.

C. ROUGH GRADE: OWNER SHALL PROVIDE ROUGH GRADE TO WITHIN 1/10TH OF ONE FOOT OF FINISHED GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADE AND DRAINAGE OF ALL CONSTRUCTION ELEMENTS AT SPECIFIED GRADIENT.

D. SITE DISCREPANCIES: ALL DISCREPANCIES IN SITE CONDITIONS, DRAWINGS OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND LANDSCAPE ARCHITECT IMMEDIATELY. IT IS THE OWNER’S RESPONSIBILITY TO CONSULT THE LANDSCAPE ARCHITECT PRIOR TO ANY FURTHER WORK IN THAT AREA. ANY

UNREPORTED DISCREPANCIES AND CONTINUED WORK WITHOUT WRITTEN AUTHORIZATION FROM THE OWNER AND LANDSCAPE ARCHITECT SHALL BE AT THE CONTRACTOR’S RISK AND EXPENSE.

E. CONTRACT FULFILLMENT: ALL QUESTIONS RELATING TO INTERPRETATION OF THE DRAWINGS AND

SPECIFICATION, QUALITY OF WORK AND ACCEPTABLE FULFILLMENT OF INTENT OF THE CONTRACT DOCUMENTS SHALL BE DECIDED BY THE OWNER AND LANDSCAPE ARCHITECT CONCURRENTLY.

III. LANDSCAPE ARCHITECT’S CONSTRUCTION FIELD OBSERVATION SCHEDULE:

A. FIELD OBSERVATION COORDINATION: THE FOLLOWING OBSERVATIONS SHALL BE INITIATED BY THE CONTRACTOR AND COORDINATED THROUGH THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER AND LANDSCAPE ARCHITECT NOT LESS THAN FORTY-EIGHT (48) HOURS IN ADVANCE OF ANY OBSERVATION. CONTINUED WORK WITHOUT OBSERVATION OF THESE PHASES OF WORK IS AT THE CONTRACTOR’S RISK, WITH ANY REQUIRED CHANGE OR MODIFICATION AT THE CONTRACTOR’S EXPENSE. THE OWNER SHALL INFORM THE LANDSCAPE ARCHITECT AS TO THE PURPOSE AND TIME OF THE OBSERVATION FORTY-EIGHT (48) HOURS IN ADVANCE.

B. CONTRACTOR ORIENTATION/ PRE-CONSTRUCTION MEETING: THIS MEETING SHALL BE CONDUCTED TO DISCUSS THE

SPECIFICATIONS, POSSIBLE DISCREPANCIES, SITE CONDITIONS AND OTHER ASPECTS OF THE PROJECT CONSTRUCTION WORK SUCH AS PERSONNEL, SCHEDULE AND REQUIREMENTS FOR STARTING WORK. PRIOR TO THE MEETING, CONTRACTOR SHALL THOROUGHLY ACQUAINT THEMSELF WITH SITE CONDITIONS AND THE PLANS, DETAILS AND SPECIFICATIONS.

C. CONSTRUCTION STAKING AND LAYOUT OBSERVATION: THIS OBSERVATION SHALL BE PERFORMED AFTER ALL CONSTRUCTION ELEMENTS, FLOW LINES AND FINISH GRADES HAVE BEEN LOCATED IN THE FIELD, BUT PRIOR TO FORMING OR EXCAVATING.

D. ROUGH CONSTRUCTION PROGRESS OBSERVATION: THIS OBSERVATION SHALL BE PERFORMED AFTER ALL FORMING,

EXCAVATION, REINFORCING STEEL AND STRUCTURAL STEEL WORK HAS BEEN COMPLETED, BUT PRIOR TO PLACEMENT OF ANY CONCRETE.

E. PROGRESS/INSTALLATION INSPECTIONS: PERIODIC INSPECTIONS SHALL BE PERFORMED BY THE OWNER DURING CONSTRUCTION OPERATIONS TO INSURE CONFORMANCE WITH THE PLANS AND SPECIFICATIONS.

F. FINAL OBSERVATION/PROJECT CERTIFICATION: THIS OBSERVATION VISIT WILL BE PERFORMED TO REVIEW ALL ASPECTS OF THE CONTRACTED WORK PRIOR TO RELEASING THE PROJECT TO THE OWNER.

IV. SCOPE OF LANDSCAPE CONSTRUCTION
C. CONCRETE AND MASONRY NOTES:

1. THE CONTRACTOR SHALL NOTIFY THE OWNER AND LANDSCAPE ARCHITECT OF ANY DISCREPANCIES BETWEEN THE PLANS, DETAILS AND NOTES.

2. NOTES AND DETAILS REFERENCES: THE FOLLOWING NOTES AND TYPICAL DETAILS REFERENCE APPLY TO ALL DRAWINGS UNLESS NOTED OTHERWISE.

3. LICENSE: THE CONCRETE CONTRACTOR SHALL BE A C-8 CALIFORNIA LICENSED CONCRETE CONTRACTOR. THE MASONRY CONTRACTOR SHALL BE A C-29 CALIFORNIA LICENSED MASONRY CONTRACTOR.

4. UNIFORM BUILDING CODE: ALL CONSTRUCTION AND WORKMANSHIP SHALL CONFORM TO THE CURRENT EDITION OF THE UNIFORM BUILDING CODE.

5. FIELD VERIFICATION: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING WORK. THE OWNER AND LANDSCAPE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES IMMEDIATELY.

6. METHODS OF CONSTRUCTION: THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE.

UNLESS OTHERWISE SHOWN, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE

AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES.

7. SAFETY PROCEDURES: OBSERVATION VISITS TO THE SITE BY FIELD REPRESENTATIVES OF THE LANDSCAPE ARCHITECT WILL

NOT INCLUDE REVIEW OF THE PROTECTIVE MEASURES OR THE CONSTRUCTION PROCEDURES REQUIRED FOR THE FINISHED STRUCTURE.

8. SOILS REPORT: ALL EXCAVATION, GRADING, COMPACTION, ETC. SHALL BE ACCOMPLISHED AND PERFORMED IN ACCORDANCE WITH THE STRUCTURAL SOILS REPORT. THE STRUCTURAL SOILS REPORT IS HEREBY MADE A PART OF THESE DRAWINGS AND

THE RECOMMENDATIONS CONTAINED THEREIN ARE TO BE FOLLOWED AND CONSIDERED AS MINIMUM UNLESS MORE STRINGENT REQUIREMENTS ARE NOTED OR DETAILED IN THE DRAWINGS OR SPECIFICATIONS.

9. SOILS COMPACTION: ALL EXISTING FILL SOIL AND DISTURBED NATURAL SOILS ARE TO BE EXCAVATED AND REPLACED WITH PROPERLY COMPACTED FILL PER THE STRUCTURAL SOILS REPORT. ALL FILLING, BACKFILLING, RE-COMPACTION, ETC., IS TO BE ACCOMPLISHED ONLY UNDER THE SUPERVISION OF A SOILS ENGINEER.

10. INSPECTIONS: ALL EXCAVATIONS ARE TO BE INSPECTED AND APPROVED BY A SOILS ENGINEER PRIOR TO THE PLACEMENT OF ANY FILL OR REINFORCING STEEL.

11. SLEEVE COORDINATION: ALL PIPE SLEEVING FOR DRAINAGE, IRRIGATION AND ELECTRICAL SERVICE, BENEATH OR EMBEDDED

IN CONCRETE OR MASONRY WALLS SHALL BE COORDINATED WITH THE APPROPRIATE SUBCONTRACTORS THROUGH THE OWNER AND APPROVED BY THE OWNER.

12. ROCK AND SAND SPECIFICATIONS: AGGREGATES FOR CONCRETE SHALL BE NATURAL SAND AND ROCK CONFORMING TO ASTM C33.

13. AGGREGATES: AGGREGATES FOR MORTAR AND GROUT SHALL BE NATURAL SAND AND ROCK CONFORMING TO ASTM C-144 AND C-404.

14. CEMENT: CEMENT SHALL BE PORTLAND CEMENT CONFORMING TO ASTM C-150, TYPE V PER STRUCTURAL SOILS REPORT.

15. CONCRETE BLOCK: ALL CONCRETE BLOCK SHALL CONFORM TO ASTM C-90, GRADE N. MASONRY SHALL BE LIGHTWEIGHT UNIT FM = 1500 PSI.

16. MORTAR: MORTAR SHALL BE TYPE ’S’ MIXED IN THE PROPORTIONS OF 1 PART PORTLAND CEMENT TO 1/2 TO 1/4 PARTS LIME PUTTY TO 2 1/4 TO 3 TIMES THE QUANTITY OF THE CEMENT PLUS LIME PUTTY PARTS OF SAND.

17. GROUT: GROUT SHALL ATTAIN A MINIMUM COMPRESSIVE STRENGTH OF 2,500 PSI AT 28 DAYS AND SHALL BE MIXED IN PROPORTIONS OF 1 PART PORTLAND CEMENT TO 1/10 PART LIME PUTTY TO 2 TO 3 PARTS SAND TO A MAX. OF 2 PARTS GRAVEL.

18. TESTING: ALL CEMENT, AGGREGATE, REINFORCING STEEL, STRUCTURAL STEEL, ETC. SHALL BE FROM TESTED STOCK. COPIES OF TEST REPORTS SHALL BE FURNISHED TO THE OWNER UPON REQUEST.

19. COMPRESSIVE STRENGTH OF CONCRETE: ALL CONCRETE IN CONTACT WITH SOIL, PROVIDE 4500 PSI CONCRETE WITH TYPE 5 CEMENT, MAXIMUM SLUMP OF 5” AND A MAXIMUM WATER-CEMENT RATIO OF 0.45 IN ALL CONCRETE.

20. REBARS: LAP ALL BARS IN CONCRETE A MINIMUM OF THIRTY SIX (36) TIMES THE DIAMETER OF THE REINFORCING BAR (2’-6” MIN.) AT ALL SPLICES. LAP ALL BARS IN MASONRY A MINIMUM OF FORTY (40) TIMES THE DIAMETER OF THE REINFORCING BAR (2’-6” MIN.) AT ALL SPICES, UNLESS NOTED OTHERWISE. SPLICES OF HORIZONTAL REBAR IN WALLS AND FOOTINGS SHALL BE STAGGERED. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 40, #4 AND SMALLER AND ASTM 1615, GRADE 60, #5 AND LARGER.

21. DOWELS: DOWELS FOR WALLS SHALL BE SAME SIZE AND SPACING AS THE WALL REINFORCEMENT AND SHALL LAP WITH THE REINFORCING BAR AS NOTED ABOVE UNLESS NOTED OTHERWISE.

22. SECURE INSERTS: ANCHOR BOLTS, DOWELS, INSERTS, ETC. SHALL BE SECURELY TIED IN PLACE PRIOR TO THE POURING OF ANY CONCRETE OR GROUT. ALL EXPOSED STEEL SHALL BE HOT DIPPED GALVANIZED.

23. WELDING: WELDING OF REINFORCING STEEL SHALL CONFORM TO AWS D12-1 USING PROPER LOW HYDROGEN ELECTRODES.

24. MINIMUM CONCRETE COVERAGE: THE FOLLOWING MINIMUM CLEAR DISTANCES BETWEEN REINFORCING STEEL AND FACE OF CONCRETE SHALL BE MAINTAINED UNLESS NOTED OTHERWISE:

SLABS ON EARTH - CENTER OF SLAB
CONCRETE BELOW GRADE, FORMED - 2”
CONCRETE BELOW GRADE, UNFORMED (POURED AGAINST EARTH)……3”

25. GROUTING: ALL MASONRY SHALL BE REINFORCED GROUTED SOLID MASONRY UNLESS NOTED OTHERWISE. GROUT SOLID ALL CELLS WHICH CONTAIN REBAR, BOLTS, ETC. GROUT SOLID ALL CELLS BELOW GRADE. ALL REINFORCEMENT, BOLTS, ETC. IN MASONRY SHALL HAVE A MINIMUM GROUT COVERAGE OF 3/4”

26. SPECIFICATION TESTING: SEE STRUCTURAL ENGINEERING CALCULATIONS TEST AND/OR INSPECTION REQUIREMENTS.

27. FIELD TESTING: CONTINUOUS INSPECTION SHALL BE PROVIDED BY A TESTING LAB FOR ALL FIELD WELDING, CONCRETE WITH SPECIFIED COMPRESSIVE STRENGTH OF 2,500 PSI OR GREATER AND CAISSONS. MASONRY SHALL HAVE CONTINUOUS INSPECTION WHERE NOTES ARE CALLED FOR IN DRAWINGS.

28. FOOTINGS: FOOTINGS SHALL BE OF THE SIZE AND TYPE AS INDICATED ON THE DRAWINGS.

29. BACKFILL: MASONRY CONTRACTOR SHALL BE RESPONSIBLE FOR BACKFILLING ALL WALLS TO GRADES PER PLAN, FINISH

GRADING FOR RUN-OFF SWALE BEHIND ALL WALLS, PERFORATED DRAIN LINES COMPLETE, WATERPROOFING ALL WALLS BELOW GRADE AND ALL EXCAVATION NECESSARY FOR THE EXECUTION OF MASONRY WORK. RELATIVELY NON-EXPANSIVE FILL SHALL BE USED IN BACKFILLING BEHIND WALLS. ALL RETAINING WALLS SHALL BE ADEQUATELY SHORED DURING THE BACKFILL OPERATION.

30. PLASTER: PRECISION BLOCK WALLS AS NOTED ON THE PLANS AND DETAILS SHALL RECEIVE BROWN COAT (3/8” THICK MIN.) APPLIED AS NOTED: 1 PART PORTLAND CEMENT, 1/4 PART HYDRATED LIME, 4 PARTS SAND 16/20, AND 3 OZ. BY WEIGHT PER SACK OF ANTI-SHRINKAGE AGENT. FOLLOW WITH COLOR FINISH COAT - 1/8” THICK.

PORTLAND CEMENT PLASTER - MIX WITH WATER PER MANUFACTURER’S INSTRUCTIONS EXCEPT ADD ONE PART ADMIXTURE EMULSION TO THREE PARTS OF WATER FOR ALL EXTERIOR PLASTER APPLIED TO WALLS.

31. PLASTER FINISH: ALL PLASTER FINISHES AND COLORS SHALL MATCH REFERENCE ARCHITECTURE OR AS DIRECTED BY OWNER.

APPLY A SAMPLE AREA FINISH PLASTER COAT OF 4’ X 4’ FOR OWNER APPROVAL PRIOR TO PROCEEDING WITH BALANCE OF PLASTER WORK. PLASTER TEXTURES, TO MATCH FINISH ON BUILDINGS IN APPEARANCE AND COLOR. VERIFY WITH OWNER FOR PLASTER COLOR AND FINISH.

32. WATER SEAL: APPLY NON-YELLOWING WATER SEALER TO ALL PLASTER SURFACES AS APPROVED BY THE OWNER.

33. FINISH: CONCRETE COLORS AND FINISHES SHALL BE PER CONSTRUCTION PLANS. COLORS AS SPECIFIED ON THE CONSTRUCTION PLAN SHALL BE OF THE INTEGRAL TYPE UNLESS NOTED OTHERWISE.

34. SAMPLES: PROVIDE THE OWNER WITH A 2’ X 2’ SAMPLE OF ALL CONCRETE AS NOTED ON THE PLANS. SAMPLES SHALL BE APPROVED BY THE OWNER AND LANDSCAPE ARCHITECT AT THE SITE PRIOR TO POURING FLATWORK.

35. THICKNESS OF CONCRETE: ALL CONCRETE FLATWORK SHALL BE A MINIMUM OF 4” THICK. NOSE ALL EDGES AS SHOWN ON THE DETAILS.

36. SLOPE WALKS TO DRAINS (SEE THE CIVIL DRAWINGS). ALL CONCRETE FLATWORK SHALL SLOPE TO DRAIN AT A MINIMUM OF 1% IN THE DIRECTION OF SITE DRAINAGE AS INDICATED ON THE CIVIL ENGINEER’S DRAWINGS.

37. COLD JOINTS: CONCRETE CONSTRUCTED FROM THE PLANS SHALL MEET ALL ENGINEER’S AND ARCHITECT’S WALKS, DRIVEWAYS, CONCRETE DECKS AND PADS, AND TOPS OF CURBS, ETC. FLUSH.

38. EXPANSION JOINTS: EXPANSION JOINTS SPACING IN CONCRETE WALKS OCCURS AT ALL CHANGES IN DIRECTION AND SHALL NOT EXCEED A MAX. SPACING OF 10’-0” ON CENTER. EXPANSION JOINT MATERIAL SHALL BE AS APPROVED BY THE OWNER.

39. NOTE: FOR ALL CONCRETE IN CONTACT WITH SOIL, PROVIDE 4500 PSI CONCRETE WITH TYPE V CEMENT, MAX. SLUMP OF 5:

AND MAX. WATER-CEMENT RATIO OF 0.45 IN ALL CONCRETE UNLESS GEOTECHNICAL ENGINEER DETERMINES THAT SOIL SULFATE EXPOSURE IS NEGLIGIBLE PER UBC TABLE 19-A-4. (2500 PSI DESIGN STRENGTH, THEREFORE CONTINUOUS INSPECTION NOT REQWUIRED, EXCEPT AT CAISSONS.)

LANDSCAPE CONSTRUCTION NOTES
EXHIBIT 3
212 of 348

STATEMENT OF COMPLIANCE

THE DESIGN OF THIS PROJECT COMPLIES WITH THE REQUIREMENTS OF THE CITY OF GLENDALE, CA.

I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS.

THE LANDSCAPING AND IRRIGATION WILL BE INSPECTED AND CERTIFIED IN

WRITING, WITH A CERTIFICATE OF SUBSTANTIAL COMPLETION, BY THE PROJECT

LANDSCAPE ARCHITECT, RYAN DRNEK, THAT THE INSTALLATION SUBSTANTIALLY

CONFORMS TO THE APPROVED PLAN PRIOR TO A FINAL LANDSCAPE INSPECTION OR OCCUPANCY BEING REQUESTED.

I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT

LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE
DOCUMENTATION PACKAGE.

12.17.2024
SIGNATURE DATE SCALE: 3/16” = 1’-0” NORTH
0' 5' 10' 15’ 20'
12:21 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

CONSTRUCTION
PLAN
L1.00
03 OF 13
NO. SYMBOL DESCRIPTION
01 COBBLESTONE PAVING SET ON TRAFFIC LOAD BASE
MATERIAL: LOMPOC COBBLE
DETAIL: #01 & 07, SHEET L1.10
02 CONCRETE PAVING @ DRIVEWAY
COLOR: INTEGRAL, TO BE SELECTED BY OWNER
FINISH: MEDIUM ACID WASH
DETAIL: #01, 02 & 04, SHEET L1.10
03 TURF GRASS @ DRIVEWAY
SEE THE PLANTING PLAN, SHEET L3.00
04 PEDESTRIAN LOAD CONCRETE PAVING
COLOR: INTEGRAL, TO BE SELECTED BY OWNER
FINISH: MEDIUM ACID WASH
DETAIL: #02, SHEET L1.10
05 CONCRETE STEPPING STONE
COLOR: INTEGRAL, TO BE SELECTED BY THE OWNER
FINISH: MEDIUM ACID WASH
DETAIL: #08, SHEET L1.10
06 STONE TILE PAVING
MATERIAL: LIMESTONE TO BE SELECTED BY OWNER
DIMENSIONS: 2’ X 4’
FINISH: BRUSHED
DETAIL: #03, SHEET L1.10
07 PLANTING AREA WITH 3” LAYER OF MULCH.

SEE THE PLANTING PLANS, SHEET L3.00
08 TURF GRASS
SEE THE PLANTING PLAN, SHEET L3.00
09 TREE PLANTING LOCATION, TYPICAL.

MAINTAIN UTILITY CLEARANCES.

SEE THE PLANTING PLAN, SHEET L3.00
10 STONE STEP TREADS WITH BRUSHED FINISH
11 EXISTING WALLS WITH NEW STUCCO FINISH TO MATCH THE RESIDENCE.

COLOR: TO BE SELECTED BY THE OWNER.
12 SIDE YARD ACCESS GATE WITH SELF-CLOSING, SELF-LOCKING POOL SAFETY DEVICE.
13 2’-6” TALL CMU RETAINING WALL WITH STUCCO FINISH AND CAP CAP: COLORED CONCRETE TO MATCH ARCHITECTURE
STUCCO: COLOR AND FINISH TO MATCH RESIDENCE
14 3’-6” TALL C.I.P. RETAINING WALL WITH VENEER AND CAP VENEER: STONE OR BRICK TO BE SELECTED BY THE OWNER
CAP: COLORED CONCRETE TO MATCH ARCHITECTURE
15 5’-0” TALL MAXIMUM HEIGHT RETAINING WALL WITH 3’-6” GLASS RAILING FINISH: STUCCO FINISH TO MATCH RESIDENCE
16 RAISED SPA WITH 1’-6” TALL SIDES AND WATER WEIR

DESIGN SUBMITTAL BY OTHERS
FINISH: ZELLIGE TILES TO BE SELECTED BY OWNER.
17 POOL WITH ZELLIGE TILES @ WATERLINE AND DIAMOND BRITE PLASTER.

COPING: LIMESTONE TO BE SELECTED BY OWNER.
18 OUTDOOR KITCHEN WITH APPLIANCES
DETAIL: #01 - 04, SHEET L1.11
COUNTERS: TO BE SELECTED BY THE OWNER.

APPLIANCES: TO BE SELECTED BY THE OWNER.
19 EXISTING 6’-0” TALL CHAINLINK FENCE TO REMAIN.
20 PASS-THROUGH BAR WITH COUNTERTOP & BIFOLD WINDOW
DESIGN PER THE ARCHITECTURE DRAWINGS.
21 EXISTING WALLS WITH NEW STUCCO FINISH TO MATCH RESIDENCE 22 6’-0” TALL WOOD FENCE WITH NEW STAINED FINISH.

COLOR: TO BE SELECTED BY THE OWNER
23 RAILROAD TIE STEPS FOR SLOPE MAINTENANCE ACCESS.
24 DECORATIVE POT WITH DRAINAGE HOLE AND IRRIGATION.

POTS TO BE SELECTED BY THE OWNER.

CONTRACTOR IS TO PROVIDE AREA DRAINS BENEATH ALL CONTAINERS 25 EXISTING EDGE OF POOL DECK PAVING
26 PROPERTY LINE
27 FAMOSA FIREPIT TABLE WITH PROTECTIVE GLASS WIND SCREEN SOURCE: COOKE FURNITURE
28 BENCH SEAT
SEE DETAIL #07, SHEET L1.10
29 OUTDOOR SHOWER WITH STONE PAVING, 4” CURB PEBBLE EDGE BASIN, EXPOSED COPPER PIPING, DRAIN, HOT & COLD WATER.
02 01 03 CONSTRUCTION LEGEND
06 07
08 05
04 05
05 05
07 07
08 09
07 07
10 13
06 08
08 07
07 06
07 07
13 07
17 16
18 19
20 21
21 23
24 24 24
24 24
24 24
12 12
14 14 15
22 27
28 29
10 10
19 21
21 21
21 22
22 19
19 19
22 22
1118
1114
1116
1100
1110
1102
1104
1106
1108
1116
TW 1117
BW 1112
1112
TW 1117
BW 1112
TW 1116
BW 1112
TW 1116
BW 1112
TW 1112
BW 1110
TW 1112
BW 1110
1112
1114
47 S.F.
370 S.F.

EXHIBIT 3
213 of 348

STATEMENT OF COMPLIANCE

THE DESIGN OF THIS PROJECT COMPLIES WITH THE REQUIREMENTS OF THE CITY OF GLENDALE, CA.

I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS.

THE LANDSCAPING AND IRRIGATION WILL BE INSPECTED AND CERTIFIED IN

WRITING, WITH A CERTIFICATE OF SUBSTANTIAL COMPLETION, BY THE PROJECT

LANDSCAPE ARCHITECT, RYAN DRNEK, THAT THE INSTALLATION SUBSTANTIALLY

CONFORMS TO THE APPROVED PLAN PRIOR TO A FINAL LANDSCAPE INSPECTION OR OCCUPANCY BEING REQUESTED.

I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT

LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE
DOCUMENTATION PACKAGE.

12.17.2024
SIGNATURE DATE SCALE: 3/16” = 1’-0” NORTH
0' 5' 10' 15’ 20'
12:21 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

WHITEHAVEN TERRACE
4'-0"
2'-7 1/2"
5'-10"
3'-0"
1'-0"
3'-0" 3'-0"
3'-0"
19'-0"
4'-1 3/8"
5'-10"
3'-0" 3'-9"
15'-3"
2'-0"
3'-6"
3'-0"
4'-6" 1'-9"
8'-0"
2'-0"
12'-3" 12'-6" 12'-3"
9'-6"
3'-11"
9"
5'-0"
2'-6" 4'-0" 3'-6"
10'-0"
8'-0"
14'-0"
3'-0" 2'-0"
46'-6"
12'-4" 8'-4" 86'-6"
20'-2" 9'-9 1/2"
1'-9" 14'-0"
13'-10"
7'-6"
2'-0"
2'-0"
2'-0" 2'-0"
3'-2"
4'-0"
5'-0"
6'-6"
11'-0"
14'-0" 6'-6"
1'-6" 6'-0"
16'-10"
5'-7" 10'-10"
2'-0" 6'-2" 4'-4" 10'-4"
8"
5'-8"
2'-0"
7'-4"
21'-3" 24'-0"
15'-10"
11'-0" 2'-9"
117'-3"
21'-3"
18'-6"
17'-0"
3'-0"
4'-2" 2'-10" 38'-7"
3'-0"
4'-7" 3'-4" 3'-0"
3'-0"
3'-0" 1'-6"
3'-0"
9"
2'-4"

STAKING
PLAN
L1.01
04 OF 13
STAKING NOTE:

THE CONTRACTOR IS TO VERIFY ALL SITE, STRUCTURE AND
IMPROVEMENT DIMENSIONS PRIOR TO CONSTRUCTION.

NOTIFY THE OWNER AND LANDSCAPE ARCHITECT OF ANY
DISCREPANCIES.

EXHIBIT 3
214 of 348

WHITEHAVEN TERRACE
F
C

IRRIGATION HYDROZONE SUMMARY
HYDROZONE TYPE AREA % TOTAL

0.10 LOW SHRUBS DRIP 2,920 S.F. 56%

0.40 MODERATE SHRUBS DRIP 1,161 S.F. 22%

0.80 HIGH TURF DRIP 1,170 S.F. 22%
TOTAL IRRIGATED AREA 5,251 S.F.

SCHEDULE 40 PVC, NON-PRESSURE LATERAL LINE. SIZE AS NOTED, 3/4" MIN. 3" SCHEDULE 40 PVC, LATERAL LINE SLEEVE
1 1/2" CLASS 315 MAINLINE
'RAINBIRD' LOW FLOW DRIP VALVE 'XC2-LF-100-PRF'
'RAINBIRD' 100-PGA REMOTE CONTROL VALVE
'RAINBIRD' 3/4" HOSE BIB
'RAINBIRD' FS100B - 1 1/2" BRASS FLOW SENSOR.
"RAIN BIRD" ESP-LXME2 - 36 STATION SMART CONTROLLER. WALL MOUNT IN WEATHER PROOF BOX. CONTRACTOR IS RESPONSIBLE FOR 120V POWER SUPPLY. INSTALL PER RAINBIRD RECOMMENDATIONS WITH RAIN SENSOR LOCATED ON ROOF.
'WATTS' LFWGV 1 1/2" GATE VALVE
1 1/2" FEBCO 825Y REDUCED PRESSURE ZONE ASSEMBLY.

INSTALL PER THE MANUFACTURER'S SPECIFICATIONS.

SYMBOL DESCRIPTION

IRRIGATION EQUIPMENT LEGEND
NOTE: ALL EQUIPMENT AND INSTALLATION METHODS ARE TO BE COMPLIANT WITH THE MANUFACTURER'S DESIGN DETAILS AND SPECIFICATIONS. THE CONTRACTOR IS TO

INSTALL PRESSURE REDUCTION DEVICES, AS NECESSARY, TO MEET EQUIPMENT SPECIFICATIONS.

F
C
DRIP IRRIGATION - ALL EQUIPMENT SPECIFIED FOR 30 PSI MIMUM. - AIR RELIEF AND FLUSH VALVES (NOT SHOWN) ARE TO BE INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS.

DRIPLINE 'RAINBIRD' XF SERIES SUBSURFACE INSTALLATION
ROWS: 12" O.C. EMITTERS: 12" O.C.

FLOW: 0.6 GPH MODEL #: XF-06-12

DRIPLINE 'RAINBIRD' XFD TUBING
WITH XB-10PC DRIP EMITTERS AT EACH ROOTBALL
FLOW : 0.5 GPH
BUBBLERS - ALL EQUIPMENT SPECIFIED FOR 25 PSI MIMUM.
- INSTALL HENDRICKSON BROS. 'FLD500 BREAK AWAY FLOW LIMITING DEVICE' ON ALL ROTOR SPRINKLERS.

BUBBLER "RAINBIRD" RWS-B-C-1402 ROOT BUBBLER
FLOW: 0.50 GPM
1/2" COPPER RISER WITH BUBBLER NOZZLE AT CONTAINER PLANT.

NO. AREA (S.F.) GPM TYPE H2O HYDROZONE
01 174 DRIP 0.10 LOW
02 335 DRIP 0.40 MODERATE
03 N/A BUBBLERS 0.40 MODERATE
04 517 DRIP 0.10 LOW
05 329 DRIP 0.80 HIGH
06 187 DRIP 0.10 LOW
07 1,881 DRIP 0.10 LOW
08 161 DRIP 0.10 LOW
09 184 DRIP 0.40 MODERATE
10 90 DRIP 0.40 MODERATE
11 491 DRIP 0.80 HIGH
12 307 DRIP 0.40 MODERATE
13 245 DRIP 0.40 MODERATE
14 350 DRIP 0.80 HIGH

VALVE LEGEND
IRRIGATION NOTES SHEET L2.10
IRRIGATION DETAILS SHEET L2.10 - L2.11
WATER USE CALCULATIONS SHEET L5.00

IRRIGATION INFORMATION

WATER SUPPLY INFORMATION
SEE THE TITLE SHEET L0.01
1/2" DIA. COPPER RISERS WITH

BUBBLER FOR CONTAINER PLANTS

CONTRACTOR TO VERIFY POINT

OF CONNECTION LOCATION,

SUPPLY AND PRESSURE
1" IN 3" SLEEVE
1" IN
3" SLEEVE
3/4" IN
3" SLEEVE

CONNECT TO EXISTING
IRRIGATION LATERAL LINE. VERIFY
EMITTER COVERAGE. REPAIR AS
NEEDED FOR FULL COVERAGE.

IRRIGATION
PLAN
L2.00
07 OF 13
01 02
03 08 07 06 05 04
10 11
12 14
09 13
TOTAL LANDSCAPE AREA 5,672 S.F.

PLANT FACTOR HYDROZONE TYPE AREA

0.10 LOW SHRUBS DRIP 2,920 S.F

0.40 MODERATE SHRUBS DRIP 1,161 S.F.

0.80 HIGH TURF GRASS DRIP 1,170 S.F.

1.00 HIGH POOL & SPA N/A 421 S.F.

MAXIMUM APPLIED WATER ALLOWANCE = (ETO) (0.62) [0.55 X LA] MAWA = (43.7) (0.62) x [.55 x 5,672]+((1-0.55) x SLA)]
MAWA = (27.094) x (3,119.6)
MAWA = 84,522 GALLONS PER YEAR
ESTIMATED TOTAL WATER USE = (ETO x 0.62) [PF x HA)/IE + SLA] = (43.7 x 0.62) [PF x HA)/IE + SLA]

0.10 LOW USE SHRUBS
ETWU = (27.094)[2,920 x .10)/.81] = 9,767 GALLONS PER YEAR

0.40 MODERATE USE SHRUBS
ETWU = (27.094)[1,161 x .40)/.81] = 15,533 GALLONS PER YEAR

0.60 HIGH USE TURF
ETWU = (27.094)[1,170 x .80)/.81] = 31,308 GALLONS PER YEAR

1.00 WATER FEATURES
ETWU = (27.094)[421 x 1.00) = 11,406 GALLONS PER YEAR
ESTIMATED TOTAL WATER USE = 68,014 GALLONS PER YEAR

SUMMARY

THE SCOPE OF THIS PROJECT COMPLIES WITH THE STATE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO) AS REQUIRED FOR NEW LANDSCAPING.

EXISTING SITE IRRIGATION AND PLANTINGS BEYOND THE SCOPE OF THIS PROJECT ARE TO REMAIN IN PLACE.

WATER BUDGET CALCULATIONS

STATEMENT OF COMPLIANCE

THE DESIGN OF THIS PROJECT COMPLIES WITH THE REQUIREMENTS OF THE CITY OF GLENDALE, CA.

I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS.

THE LANDSCAPING AND IRRIGATION WILL BE INSPECTED AND CERTIFIED IN

WRITING, WITH A CERTIFICATE OF SUBSTANTIAL COMPLETION, BY THE PROJECT

LANDSCAPE ARCHITECT, RYAN DRNEK, THAT THE INSTALLATION SUBSTANTIALLY

CONFORMS TO THE APPROVED PLAN PRIOR TO A FINAL LANDSCAPE INSPECTION OR OCCUPANCY BEING REQUESTED.

I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT

LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE
DOCUMENTATION PACKAGE.

12.17.2024
SIGNATURE DATE SCALE: 3/16” = 1’-0” NORTH
0' 5' 10' 15’ 20'
12:35 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024
EXHIBIT 3
215 of 348
12:35 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

IRRIGATION

DETAILS
L2.10
RAIN SENSOR 08 OF 13

22. 23.

24. 25.

26. 27.

28. 29.

30. 31.

32. 33.

34. 35.

36. THIS IRRIGATION DESIGN PLAN IS DIAGRAMMATIC, AND THE LAYOUT MAY NOT BE PRECISE. THE

CONTRACTOR IS RESPONSIBLE FOR MINOR CHANGES IN HEAD PLACEMENT, AND SPRINKLER ARC AND DISTANCE ADJUSTMENTS, TO MINIMIZE OVERSPRAY AND PROVIDE 100% COVERAGE IN ALL PLANTED AREAS. NOTE THAT THIS MAY INVOLVE ADJUSTING OR CHANGING SPRINKLER NOZZLES, INSTALLING

PRESSURE COMPENSATING SCREENS ON SPRAY HEADS, ADJUSTING THE REMOTE CONTROL VALVE FLOW CONTROL, CHANGING SPRINKLER BODIES, ETC., AS NECESSARY.

REVIEW THE PLANTING PLANS PRIOR TO IRRIGATION SYSTEM TRENCHING OR HEAD INSTALLATION TO AVOID INTERFERENCE WITH PLANTING PATTERNS. TREES AND SHRUBS MAY BE PLANTED IN RESTRICTED AREAS, AND OFTEN WITH EQUAL SPACING AND/OR PRECISE ALIGNMENT. THESE PLANTING PATTERNS ARE TO BE CONSIDERED IN ESTABLISHING THE IRRIGATION LAYOUT.

AREAS WHERE NEW IRRIGATION SYSTEMS ARE TO INSTALLED ARE TO BE REVIEWED AND VERIFIED BY THE PROJECT MANAGER AND LANDSCAPE ARCHITECT FOR ACCURACY OF SIZE AND CONFIGURATION.

IF DISCREPANCIES ARE FOUND, NOTIFY THE LANDSCAPE ARCHITECT FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

VERIFY THAT ALL IRRIGATION ASSEMBLIES WILL CONFORM WITH THE SITE-WORK AND PLANTER CONDITIONS PRIOR TO ORDERING ANY PRE-ASSEMBLED EQUIPMENT FROM THE MANUFACTURER. THE

INSTALLATION MAY BE MODIFIED IF NECESSARY, WITH THE APPROVAL OF THE LANDSCAPE ARCHITECT, TO AVOID OBSTACLES, CROWDED SITUATIONS, AND SHALLOW PLANT PIT DEPTHS.

IRRIGATION SYSTEMS SHALL BE DESIGNED AND INSTALLED TO AVOID OVERSPRAY AND RUNOFF.

VALVES SHALL BE SEPARATED FOR INDIVIDUAL HYDRO-ZONES BASED ON PLANT WATER NEEDS AND SUN OR SHADE REQUIREMENTS.

WATER BUDGET CALCULATIONS (SECTION 15.54.030.J. ABOVE) SHALL BE SHOWN ON THE IRRIGATION PLANS.

AN AUTOMATIC IRRIGATION SYSTEM IS REQUIRED AND SHALL INCLUDE A WEATHER-BASED IRRIGATION CONTROLLER, INCLUDING A RAIN SHUT-OFF SENSOR.

AREAS LESS THAN EIGHT FEET WIDE SHALL BE IRRIGATED WITH APPROPRIATELY SELECTED

EQUIPMENT THAT PROVIDES THE PROPER AMOUNT OF WATER COVERAGE WITHOUT CAUSING OVERSPRAY ONTO ADJACENT SURFACES.

ALL SPRINKLERS SHALL HAVE MATCHED PRECIPITATION RATES WITHIN EACH VALVE AND CIRCUIT. ALL

IRRIGATION SYSTEMS SHALL BE DESIGNED TO INCLUDE OPTIMUM DISTRIBUTION UNIFORMITY, HEAD TO HEAD SPACING, AND SETBACKS FROM WALKWAYS AND PAVEMENT.

ALL IRRIGATION SYSTEMS SHALL PROVIDE CHECK VALVES AT THE LOW END OF THE IRRIGATION LINES TO PREVENT UNWANTED DRAINING OF IRRIGATION LINES.

PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE IS BELOW OR EXCEEDS THE RECOMMENDED PRESSURE OF THE SPECIFIED IRRIGATION DEVICES.

CHECK VALVES OR ANTI-DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE LOW POINT DRAINAGE COULD OCCUR.

A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT WITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES.

CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE SIGNER FO THE

LANDSCAPE PLANS, THE SIGNER FO THE IRRIGATION PLANS, OR THE LICENSED LANDSCAPE CONTRACTOR FOR THE PROJECT.

AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED AT THE TIME OF FINAL INSPECTION.

IRRIGATION SPECIFICATIONS

ALL IRRIGATION SYSTEMS SHALL BE ZONED TO TAKE INTO ACCOUNT PREVAILING WINDS, DEGREE OF SLOPE, TYPE

OF SOIL, ORIENTATION OF THE SITE, SEASON, INSOLATION, TYPE OF VEGETATION TO BE IRRIGATED, TYPE OF

IRRIGATION APPLICATION EQUIPMENT AND SUCH OTHER DESIGN INFORMATION AS THE DEPARTMENT MAY REQUIRE. THESE DESIGN CONSTRAINTS, AND ANY OTHERS THAT MAY BE SPECIFIC TO THE SITE, SHALL BE CLEARLY INDICATED ON ALL IRRIGATION DOCUMENTS.

ALL IRRIGATION SYSTEMS SHALL BE DESIGNED TO MINIMIZE IRRIGATION OF ANY UNPLANTED SURFACE, AND TO MINIMIZE DRAINAGE OF WATER ONTO ANY PAVED SURFACE.

ALL EQUIPMENT IRRIGATING WALKABLE SURFACES SHALL BE INSTALLED FLUSH TO GRADE.

NO EQUIPMENT SHALL BE INSTALLED CLOSER THAN 12 INCHES TO ANY PAVED SURFACE, UNLESS SEPARATED FROM THE PAVED SURFACE BY A WALL, FENCE, CURB, OR SIMILAR BARRIER, OR INSTALLED UNDERGROUND.

ANY HEAD LOCATED LOWER THAN THE ELEVATION OF ITS CONTROLLING VALVE AND DRAINING MORE THAN 20 FEET OF PIPE SHALL BE EQUIPPED WITH A DEVICE THAT PREVENTS DRAINAGE OF WATER THROUGH THE HEAD.

SYSTEMS SHALL BE DESIGNED TO THE LOWEST RESIDUAL PRESSURE AVAILABLE, AND SUCH PRESSURE SHALL BE INDICATED IN THE IRRIGATION DOCUMENTS.

PRESSURE AT ANY POINT WITHIN A SECTION SHALL NOT VARY MORE THAN 20 PERCENT OR 20 PSI FROM THE DESIGN OUTLET OPERATING PRESSURE, UNLESS PRESSURE COMPENSATING DEVICES ARE USED.

IN SLOPE INSTALLATIONS OVER 5 PERCENT, IRRIGATION SYSTEMS SHALL BE DESIGNED TO PROVIDE NO MORE THAN 3/10 INCH WATER PER HOUR AT ANY POINT ON THE PLANTED SLOPE, OR NOT MORE THAN THE SOIL INFILTRATION RATE, WHICHEVER IS LESS. SYSTEMS MAY ACHIEVE THIS RATE BY CYCLING, BUT IN ANY CASE THE OPERATING CYCLE SHALL NOT BE OF SUCH LENGTH THAT WATER IS ALLOWED TO RUN OFF THE SLOPE.

ADEQUATE BACKFLOW PROTECTION SHALL BE INSTALLED IN EACH IRRIGATION SYSTEM.

A FUNCTIONAL TEST OF THE IRRIGATION SHALL BE PERFORMED BY THE INSTALLER FOR EVERY IRRIGATION SYSTEM PRIOR TO APPROVAL BY THE DESIGNER.

REQUIREMENTS BY THE DEPARTMENT OF CITY PLANNING FOR IRRIGATION SYSTEMS SHALL BE NOT CONSTRUED AS PROHIBITING OTHER CITY DEPARTMENTS FROM REQUIRING APPROVAL OF IRRIGATION SYSTEMS. IN THE CASE OF CONFLICTS BETWEEN THESE REQUIREMENTS, THE MORE RESTRICTIVE SHALL CONTROL.

MANAGEMENT PLAN.

A. A MANAGEMENT PLAN FOR THE SYSTEM, AS SPECIFIED BY THE DEPARTMENT OF CITY PLANNING, EMPHASIZING

WATER CONSERVATION, SHALL BE INCLUDED WITH ALL IRRIGATION SYSTEMS DOCUMENTATION, AND IF AN

AUTOMATIC CONTROLLER IS USED, A COPY OF THE PLAN SHALL BE PERMANENTLY AFFIXED TO THE CONTROLLER OR TO A SURFACE IMMEDIATELY ADJACENT TO IT.

B. THE WATER MANAGEMENT PLAN SHALL INCLUDE AT LEAST THE FOLLOWING FOR ALL CIRCUITS IN THE IRRIGATION SYSTEM:
-RECOMMENDED WATERING DURING PLANT ESTABLISHMENT
-RECOMMENDED SUMMER WATERING AFTER PLANT ESTABLISHMENT
- RECOMMENDED WINTER WATERING AFTER PLANT ESTABLISHMENT.

EXISTING NATURAL PLANT COMMUNITIES, MAINTAINED IN A NATURAL STATE, SHALL NOT NORMALLY BE REQUIRED TO BE IRRIGATED. NEW NATURAL PLANT COMMUNITIES MAY BE REQUIRED TO BE IRRIGATED DURING ESTABLISHMENT.

ALL AUTOMATICALLY CONTROLLED IRRIGATION SYSTEMS SHALL INCLUDE A RAIN SENSING DEVICE.

WHEN THE ACTUAL MEASURED OR CALCULATED MINIMUM STATIC PRESSURE DOWNSTREAM OF ANY CONTROL VALVE IS BELOW 40 PSI, IRRIGATION SYSTEMS EXCEPT FOR DRIP OR OTHER LOW FLOW SYSTEMS SHALL INCLUDE COMPENSATING DESIGN OR EQUIPMENT MODIFICATIONS.

FOR ALL AREAS OVER 5 PERCENT IN SLOPE, GLOBE OR BALL VALVES SHALL BE LOCATED ON THE MAINLINE UPSTREAM FROM THE CONTROL VALVE AND ADJACENT TO THE SLOPE AREA. VALVES SHALL BE MARKED 'EMERGENCY SHUTOFF.'
SPRINKLER, ROTOR AND IMPACT HEAD SPACING SHALL BE DESIGNED TO ACHIEVE UNIFORMITY OF COVERAGE.

ANY APPLICATION FOR DISCRETIONARY APPROVAL OF A PROJECT LARGER THAN 40,000 SQUARE FEET OF FLOOR AREA AS DEFINED IN SECTION 12.03 OF THE LOS ANGELES MUNICIPAL CODE SHALL BE REQUIRED TO CONSIDER THE USE OF RECLAIMED WATER FOR IRRIGATION PURPOSES.

PRESSURE REGULATORS SHALL BE INSTALLED WHEN THE ACTUAL MEASURED OR CALCULATED MAXIMUM STATIC PRESSURE DOWNSTREAM OF ANY CONTROL VALVE EXCEEDS 80 PSI.

EXCEPTIONS: EXCEPTIONS TO WATER MANAGEMENT REQUIREMENTS MAY BE MADE IN THOSE INSTANCES WHERE IT IS PHYSICALLY IMPOSSIBLE TO ACCRUE THE POINTS REQUIRED. IN SUCH INSTANCES, THE APPLICANT SHALL

DEMONSTRATE THAT ALL PHYSICALLY POSSIBLE WATER MANAGEMENT TECHNIQUES AND FEATURES ALLOWED BY THE SITE WERE USED. THE DEPARTMENT MAY REQUIRE MINOR, INEXPENSIVE AND EASY DESIGN IMPROVEMENTS IF THEY ALLOW THE APPLICANT TO MEET THE POINT TOTALS. EXCEPTIONS SHALL NOT BE MADE SOLELY BY REASON THAT THE PROPOSED LANDSCAPE IS ON SLAB, OR IN CONTAINERS.

FOR THE PURPOSE OF LEGIBILITY, SOME IRRIGATION VALVES AND LINES ARE SHOWN IN PAVED AREAS. ALL

VALVES ARE TO BE LOCATED WITHIN PLANTED AREAS AND, WHEREVER POSSIBLE, LINES ARE TO BE ROUTED INSIDE (WITHIN 6" OF) THE EDGE OF PLANTED AREAS.

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.

13. 14.

15. 16.

17. 18.

19. 20.

21. CONTROLLER
12" MIN./
18" FOR
ROTORS 18" 24"
24"
6" MIN.

MIN. 3" EARTH PAD

REMOTE CONTROL
WIRING W/ MIN.
18" COVER

IRRIGATION SUPPLY LINE
FOR SIZES 3" & SMALLER

FINISH GRADE LATERAL LINE SUB-GRADE PAVING

EXISTING SOIL

W/ NO ROCK

LARGER THAN
3/4"
HAND

BACKFILL

CONTROL WIRES

IRRIGATION PIPE
SLEEVE
SCH. 40 PVC

SEE SIZING CHART
BELOW
TRENCHES TO BE WIDE ENOUGH TO ALLOW 4" MIN. HORIZONTAL
CLEARANCE BETWEEN PARALLEL PIPES.

COMPACT TRENCH BACKFILL TO COMPACTION SAME AS ADJACENT AREAS AND TO 90% COMPACTION IN PAVED AREAS.

NOTES:
•
•

TRENCHING AND SLEEVING DRIP IRRIGATION VALVE

POP-UP SPRAY

QUICK COUPLER

WIRE CONNECTION

SLEEVE INSTALLATION PIPE INSTALLATION VALVE BOX IDENTIFICATION BALL VALVE EXHIBIT 3
216 of 348
12:35 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

FLOW SENSOR

DRIP LINE LAYOUT
DRIP LINE RINGS AT TREES DRIP LAYOUT: IRREGULAR AREAS

RESIDENTIAL CONNECTION DRIP AIR RELIEF VALVE SPARE WIRE BOX

FEBCO BACKFLOW PGA SERIES REMOTE CONTROL VALVE

IRRIGATION

DETAILS
L2.11
09 OF 13
EXHIBIT 3
217 of 348
PC
PC
PC
PC
PC
PC
B1 B1 B1 B1 B1
B1
B1
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
B1
B1
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC

M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M RI
RI
RI
RI
RI
RI
RI
KR
KR
KR
KR
KR
KR
KR
KR
KR
KR

KR LC LC LC
LC
LC
LC
LC
LC
LC
LC
LV
LV
LV LV
LV LV
LO
LO
LO
LO
LO
LO
LO
LO

YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP YP

LV LV LV LV LV
LV
LV

LV LV LV LV LV LV
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA

SA SA SA SA SA SA SA
GB
GB
GB
GB
GB
GB
GB
GB

GB GB GB GB
GB
GB
GB
GB
GB
GB
GB
GB
GB
B1 B1 B1 B1 B1 B1 B1 B1
B1
B1
B1 B1
B1

HY HY HY

HY HY HY
LC
KR
KR
KR
KR
KR
LC
LC
LC
GB
GB
GB
GB
GB
GB
GB
GB
LO
LO
LO

LO LO LO

LO LO LO
LO
LO

LO LO LO

LO LO LO

RP RP RP
RP

RP RP RP
RP
RP RP
RP

RP RP RP
RP
RP

RI RI RI RI
B1 B1 B1 B1
SA
SA
SA
SA
SA

SA SA SA SA SA SA SA

STATEMENT OF COMPLIANCE

THE DESIGN OF THIS PROJECT COMPLIES WITH THE REQUIREMENTS OF THE CITY OF GLENDALE, CA.

I HAVE COMPLIED WITH THE CRITERIA OF THE ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS.

THE LANDSCAPING AND IRRIGATION WILL BE INSPECTED AND CERTIFIED IN

WRITING, WITH A CERTIFICATE OF SUBSTANTIAL COMPLETION, BY THE PROJECT

LANDSCAPE ARCHITECT, RYAN DRNEK, THAT THE INSTALLATION SUBSTANTIALLY

CONFORMS TO THE APPROVED PLAN PRIOR TO A FINAL LANDSCAPE INSPECTION OR OCCUPANCY BEING REQUESTED.

I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT

LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE
DOCUMENTATION PACKAGE.

12.17.2024
SIGNATURE DATE SCALE: 3/16” = 1’-0” NORTH
0' 5' 10' 15’ 20'
12:36 PM 12/17/24

THIS DRAWING AND THE DESIGNS, ARRANGEMENTS,

DEPICTIONS, IDEAS AND OTHER INFORMATION

CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF

SODDER STUDIO AND SHALL REMAIN PROPERTY OF
SODDER STUDIO IN PERPETUITY. THIS DRAWING IS PART

OF THE CONTRACT DOCUMENTS FOR THE STATED
PROJECT AND SHALL BE USED ONLY AS SUCH. NO PART

THEREOF SHALL BE REPRODUCED, COPIED, DISCLOSED,

DISTRIBUTED, SOLD, PUBLISHED OR OTHERWISE USED IN

ANYWAY FOR ANY OTHER PURPOSE WITHOUT THE

ADVANCED EXPRESS WRITTEN CONSENT OF SODDER
STUDIO. VISUAL CONTACT WITH THE ABOVE DRAWINGS,

OR ANY PART THEREOF, SHALL CONSTITUE CONCLUSIVE
EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.

OWNER

SHEET TITLE
SHEET

SHEET LEGEND
L0.01 LANDSCAPE TITLE SHEET
L0.02 GENERAL NOTES
L1.00 CONSTRUCTION PLAN
L1.01 STAKING PLAN
L1.10 CONSTRUCTION DETAILS
L1.11 CONSTRUCTION DETAILS
L2.00 IRRIGATION PLAN
L2.10 IRRIGATION DETAILS
L2.11 IRRIGATION DETAILS
L3.00 PLANTING PLAN
L3.10 PLANTING NOTES & DETAILS
L4.00 LIGHTING PLAN
L5.00 WATER USE INFORMATION
THIRTEEN (13) SHEETS TOTAL
No. Description Date
1 75% C.D. SET 10.22.2024

REVISIONS
SHEET NO.

DATE

DRAWN BY

12.17.2024
RD

MAZMANIAN RESIDENCE
906 WHITEHAVEN TERRACE

GLENDALE, CALIFORNIA
LIC
E

N S E D L A N D S C A P E A R C H I T E
C
T

S T A T E O F C AL I F O R N I A
R
Y
A
N
J . D R N E K
N o. 5170
Signature

11.30.25 Renewal Date

12.17.2024
Date

RYAN DRNEK, LANDSCAPE ARCHITECT
CALIFORNIA LIC. NO. 5170 EXP. 11/2025
[email protected]
landscape architecture + planning
Sodder
Studio
12405 Venice Blvd. #275
Los Angeles, Ca 90066
www.sodderstudio.com

LANDSCAPE DESIGN

BRYAN GARRENE, LANDSCAPE ARCHITECT
MR. MIKE MAZMANIAN
906 WHITEHAVEN TERRACE
GLENDALE, CA 91207
P. 818.434.3414
E. [email protected]
2 100% C.D. SUBMITTAL 12.17.2024

WHITEHAVEN TERRACE

PLANTING LEGEND
NOTE: SEE SHEET L3.10 FOR NOTES AND DETAILS. WUCOLS REGION: 3

TYPE BOTANICAL NAME SIZE QTY WATER PLANT MAX HEIGHT

SYM COMMON NAME USE FACTOR MAX WIDTH
TREES
C1 CITRUS TREE 24" BOX 4 MODERATE 0.40 10' TALL
Citrus species to be selected DWARF STOCK 10' WIDE
O1 SEVILLANO OLIVE TREE 96" BOX 1 LOW 0.10 25' TALL
Olea europea 100 YR. FIELD DUG 25' WIDE
O2 FRUITLESS OLIVE TREE 36" BOX 5 LOW 0.10 25' TALL
Olea europea 'Swan Hill' MULTI-TRUNK 25' WIDE
O3 FRUITLESS OLIVE TREE 24" BOX 3 LOW 0.10 15' TALL
Olea europea 'Swan Hill' MULTI-TRUNK 15' WIDE
P1 CAPITAL PEAR 36" BOX 2 MODERATE 0.40 20' TALL
Pyrus c. 'Capital' STANDARD 15' WIDE

SHRUBS & HEDGES
B1 BOXWOOD GLOBE 5 GALLON 39 MODERATE 0.40 2' DIA. GLOBE Buxus microphylla GLOBE
YP CALIFORNIA LILAC 5 GALLON 26 LOW 0.10 3' TALL X 8' WIDE Ceanothus g.h. 'Yankee Point'
HY WHITE HYDRANGEA 5 GALLON 6 MODERATE 0.40 5' TALL X 5' WIDE Hydrangea m. 'White'
LO SPANISH LAVENDER 5 GALLON 25 LOW 0.10 3' TALL X 3' WIDE Lavandula s. 'Otto Quast'
LC GOODWIN CREEK LAVENDER 5 GALLON 14 LOW 0.10 3' TALL X 3' WIDE Lavandula g. 'Goodwin Creek'
LV GROSSO FRENCH LAVENDER 5 GALLON 19 LOW 0.10 3' TALL X 3' WIDE Lavandula i. 'Grosso'
M LITTLE OLLIE DWARF OLIVE 5 GALLON 47 LOW 0.10 3' TALL X 3' WIDE Olea e. 'Montara'
KR KARLEY ROSE FOUNTAIN GRASS 5 GALLON 16 LOW 0.10 3' TALL X 3' WIDE Pennisetum orientale 'Karley Rose'
PC CAROLINA CHERRY 15 GALLON 64 MODERATE 0.40 HEDGE TO 8' TALL Prunus caroliniana STAKED x 3' WIDE
RI ICEBERG ROSE 5 GALLON 11 MODERATE 0.40 3' TALL X 3' WIDE Rosa 'Iceberg' SHRUB
RP TRAILING ROSEMARY 5 GALLON 16 LOW 0.10 18" TALL X 6' WIDE Rosmarinus prostratus
SA AUTUMN MOOR GRASS 1 GALLON 38 MODERATE 0.40 18" TALL X 18" WIDE Sesleria autumnalis
GB GREY BOX COAST ROSEMARY 5 GALLON 29 LOW 0.10 3' TALL X 3' WIDE Westringia 'Grey Box'

← All documents from this meeting