no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:27:58 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
**
COVER SHEET
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
236 NORTH CENTRAL AVENUE
GLENDALE, CA
MGP XII Glendale Central, LLC
4365 Executive Drive Suite 1400
San Diego, CA 92121
Contact: Jamas Gwilliam
Email: [email protected]
858.259.9909
Owner
Maple Multi-Family Land CA, LP
5790 Fleet Streer, SUITE 140,
Carlsbad, CA 92008
Contact: Reece Pettersen
Email: [email protected]
760.444.5236
Developer
EPT Design
234 North El Molino Avenue
Suite 100
Pasadena, CA 91101
626.795.2008
Landscape
PSOMAS
555 South Flower Street
Suite 4300
Los Angeles, CA 90071
213.223.1400
Civil
Dudek
38 North Marengo Avenue
Pasadena, CA 91101
760.479.4256
Traffic
AC Martin, Inc.
444 South Flower Street,
Suite 1200
Los Angeles, CA 90071
213.683.1900
Architect
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
CC_10212025_Exhibit 14 - Stage II Design Review Architectural Drawings no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
4 08/08/25 Stage II Update
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 8/8/2025 10:21:56 PM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
08/08/2025
A0.00
DIRECTORY
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
A0.00 DIRECTORY
A0.01 PROJECT LOCATION / SUMMARY
A0.02 DESIGN NARRATIVE
A0.03 EXISTING SITE PHOTOS
A0.04 EXISTING SITE PHOTOS - ORANGE ST.
A0.05 EXISTING SITE PHOTOS - N CENTRAL AVE.
A0.06 EXISTING SITE PHOTOS - CALIFORNIA AVE
A0.07 EXISTING SITE PHOTOS - SALEM
A0.08 EXISTING SITE PHOTOS - WILSON
A0.09 EXISTING SITE PHOTOS - PROPOSED PASEO
A0.10 EXISTING SITE PHOTOS - CENTRIPETAL VIEWS
A0.11 MAXIMUM HEIGHT & FAR
A0.12 SETBACKS
A0.13 PARKWAY & SIDEWALKS
A0.14a PUBLIC OPEN SPACE
A0.14b OPEN SPACE CALCULATIONS
A0.15 HEIGHT MODULATION
A0.16 FACADE MODULATION
A0.17 BUILDING SEPARATIONS
A0.18 ARCHITECTURAL ELEMENTS
A0.19 GROUND FLOOR USE RESTRICTIONS
A0.20 MATERIALS, FENESTRATION, ETC.
A0.21 TRASH SERVICE ACCESS PLAN
A0.22 TENANT LOADING ACCESS PLAN
A1.00 EXISTING SITE SURVEY PAGE 1
A1.01 EXISTING SITE SURVEY PAGE 2
A1.03 EXISTING SITE PLAN / AERIAL
A1.04 PHASE I SITE PLAN / AERIAL
A1.05 PHASE II SITE PLAN / AERIAL
A2.00 P2 PARKING PLAN
A2.01 P1 PARKING PLAN
A2.10 GROUND LEVEL PLAN
A2.20 SECOND FLOOR PLAN
A2.30 THIRD FLOOR PLAN
A2.40 FOURTH FLOOR PLAN
A2.50 FIFTH FLOOR PLAN
A2.60 SIXTH FLOOR PLAN
A2.70 SEVENTH FLOOR PLAN
A2.80 EIGHTH FLOOR PLAN
A2.90 ROOF PLAN
A3.0 ENLARGED UNIT PLANS
A3.1 ENLARGED UNIT PLANS
A3.2 ENLARGED BUILDING PLANS - A LEVEL 1
A3.2A ENLARGED FLOOR PLAN - A LEVEL 2
A3.3 ENLARGED BUILDING PLANS - B LEVEL 1
A3.3A ENLARGED BUILDING PLANS - B LEVEL 2
A3.4 ENLARGED BUILDING PLANS - C LEVEL 1
A3.4A ENLARGED BUILDING PLANS -C LEVEL 2
A3.5 ENLARGED BUILDING PLANS - D LEVEL 1
A3.5A ENLARGED BUILDING PLANS - D LEVEL 2
A3.6 WALL SECTIONS
A3.7 WALL SECTIONS
A3.8 WALL SECTIONS
A3.9 WALL SECTIONS
A4.0 BUILDING SECTIONS
A4.1 BUILDING SECTIONS
A4.2 BUILDING SECTIONS
A4.3 BUILDING SECTIONS
A4.4 EXTERIOR ELEVATIONS
A4.5 EXTERIOR ELEVATIONS
A4.6 EXTERIOR ELEVATIONS
A4.7 EXTERIOR ELEVATIONS - LIGHTING DESIGN
A4.8 EXTERIOR ELEVATIONS - LIGHTING DESIGN
A5.0 SITE CONTEXT
A5.1 SITE CONTEXT
A5.2 SITE CONTEXT
A5.3 SITE CONTEXT
A6.0 CONCEPT
A6.1 TYPOLOGY
A6.2 CONCEPT / IMAGERY
A6.3 SHADOW STUDY - EQUINOX
A6.4 SHADOW STUDY - SUMMER SOLSTICE
A6.5 SHADOW STUDY - WINTER SOLSTICE
A7.0 PROJECT VIEWS
A7.1 PROJECT VIEWS
A7.2 PROJECT VIEWS
A7.3 PROJECT VIEWS
A7.4 PROJECT VIEWS
A7.5 PROJECT VIEWS
A7.6 PROJECT VIEWS - LIGHTING DESIGN
A7.7 PROJECT VIEWS - LIGHTING DESIGN
A7.8 PROJECT VIEWS - LIGHTING DESIGN
A7.9 PROJECT VIEWS - LIGHTING DESIGN
A7.10 PROJECT VIEWS - LIGHTING DESIGN
Drawing Index
A7.11 PROJECT VIEWS - LIGHTING DESIGN
A7.12 PROJECT VIEWS - LIGHTING DESIGN
A7.13 PROJECT VIEWS - LIGHTING DESIGN
A7.14 PROJECT VIEWS - LIGHTING DESIGN
A7.15 PROJECT VIEWS - LIGHTING DESIGN
A7.16 PROJECT VIEWS - LIGHTING DESIGN
A7.17 PROJECT VIEWS - LIGHTING DESIGN
A8.0 SECTION DETAILS
A8.1 SECTION DETAILS
A8.2 SECTION DETAILS
A9.0 GROSS SITE AREA EXHIBIT
A9.1 BUILDING HEIGHT EXHIBIT
C3.00 UTILITY PLAN
C3.10 GRADING PLAN - PHASE 1
C4.00 STORM DRAIN & LID
C5.00 UTILITY PLAN
L0.00 NARRATIVE INSPIRATION
L0.10 NARRATIVE INSPIRATION
L0.20 LANDSCAPE PROGRAM DIAGRAM
L0.30 CONCEPT IMAGERY
L0.40 CONCEPT IMAGERY
L0.50 ILLUSTRATIVE LANDSCAPE PLAN
L0.60 OPEN SPACE CALCULATIONS
L1.00 GROUND LEVEL CONSTRUCTION PLAN
L1.10 2ND LEVEL CONSTRUCTION PLAN
L1.30 ROOF DECKS, 6TH AND 8TH LEVEL
CONSTRUCTION PLAN
L1.40 HARDSCAPE MATERIAL BOARD
L1.51 CONSTRUCTION DETAILS
L1.52 CONSTRUCTION DETAILS
L1.53 CONSTRUCTION DETAILS
L2.00 GROUND LEVEL PLANTING PLAN
L2.10 2ND LEVEL PLANTING PLAN
L2.20 ROOF DECKS, 6TH AND 8TH LEVEL PLANTING PLAN
L2.40 PLANT PALETTE
LD 1-1.01 GROUND LEVEL LIGHTING PLAN
LD 1-1.02 PODIUM LEVEL LIGHTING PLAN
LD 1-1.03 ROOF DECKS 6TH & 8TH LEVEL LIGHTING PLAN
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
VICINITY MAP
500 FT RADIUS
PROJECT LOCATION no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
4 08/08/25 Stage II Update
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 8/5/2025 2:44:19 PM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
08/05/2025
A0.01
PROJECT
LOCATION /
SUMMARY
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
no. date revision
revisions
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
4 08/08/25 Stage II Update
Stage II Submittal
08/08/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 6/13/2025 11:40:20 AM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
A0.02
DESIGN
NARRATIVE
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
The project has been designed to comply with
the Glendale Downtown Specific Plan by
conforming to the urban design standards set
forth by the plan. The site planning, modulation
of form, orientation and street edge conditions
all make the project unique to the Orange
District and the modulation of height and façade
relates to the human scale and creates a visual
interest along the pedestrian realm.
The project will increase the quality of the
neighborhood environment through its
architectural design. The exterior design
incorporates a variety of architectural
typologies, using materials and finishes
organized with a hierarchical, proportional, and
symmetrical intent. The architectural typologies
are informed from the several architectural
styles established throughout the history of
Glendale up until this day and relate to the
predominant characteristics of the downtown
neighborhood. A complement of early 19th
century industrial age, midcentury modern and
contemporary styled facades give the project a
diverse quality and lend to many unique
moments around the project. Traditional styled
details work alongside more modern and
contemporary clean lines and open storefronts.
Street level facades use human scaled
materials and finishes and provide depth and
contrast in color. The building façade is
modulated with a strong base - middle – top
proportion. Low-E glazing with aluminum
storefront and box frame windows, brick
veneer, metal panel, composite panel, concrete
tile, and exterior plaster compose the exterior
façade. Though the architecture styling is taken
from a blending of history of Glendale the
language of the building is expressed in
modern materials and detailing giving a clean,
contemporary, and timeless feel. The exterior
colors are simple and subdued, consisting
primarily of natural tones, elegantly
proportioned brick façade, and concrete tile.
Landscaping of the public open space and
throughout softens the impact of the building
and relates to the human scale. Substantial
glazing is used throughout the project's street
level facades with occasional sections of brick
facade, natural stone brick, and metal panel
and glazed storefront. It's an attractive design
partnering the timeless architecture styles from
Glendale's past and modern materials and
methods which supports and contributes to the
urban design and planning of the Orange
District of Downtown Glendale.
The proposed project is located within the
Orange District along North Central Avenue
and West California Avenue, and North Orange
Street. The main, multi-family / live-work
development will take place on a 4.75 acre site
that currently exists as a commercial
departments store (Sear’s), and parking
structure.
This multifamily / live work project consists of
665 residential units and 17 live-work units for a
total of 682 units, various indoor amenity areas,
outdoor pool and spa areas, fitness center, and
indoor / outdoor open space areas. The project
also provides for approximately 13,397 square
feet public accessible open space provided in a
mid-block pedestrian paseo and numerous
plazas are provided as a community benefit
intended to enhance the downtown experience
in and around the project. 930 total parking
spaces are provided in three levels of grade
level and subterranean parking structure.
The project supports the community's image
and the City's vision of a sustainable Downtown
by enlivening the Downtown district and
activating the public realm with a mix of public /
private, residential and live-work uses that will
provide for the needs and amenities of
residents and the downtown workforce.
Situated in the Orange District the residential
use provides much needed housing for the
community utilizing a 43.57% density bonus
through AB2345 and will set aside 15% of the
base density residential units for very low and
low income households. New public
improvements along the project's frontages
create a safer pedestrian linkage between the
different downtown districts and greater
Glendale stimulating even further development
in Downtown Glendale. The public accessible
open space paseo and plazas, elevated pool
decks, indoor / outdoor amenity areas will
provide a shelter from the urban environment.
Design Narrative
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
SITE PHOTO KEY PLAN
75' 150' 300'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:28:45 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.03
EXISTING SITE
PHOTOS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:28:58 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.04
EXISTING SITE
PHOTOS - ORANGE
ST.
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:29:09 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.05
EXISTING SITE
PHOTOS - N
CENTRAL AVE.
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:29:21 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.06
EXISTING SITE
PHOTOS -
CALIFORNIA AVE
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:29:32 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.07
EXISTING SITE
PHOTOS - SALEM
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:29:43 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.08
EXISTING SITE
PHOTOS - WILSON
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:29:55 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.09
EXISTING SITE
PHOTOS -
PROPOSED PASEO
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:30:07 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.10
EXISTING SITE
PHOTOS -
CENTRIPETAL
VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 6/13/2025 11:55:02 AM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
A0.11
MAXIMUM HEIGHT
& FAR
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Diagram - Phase I Height
Diagram - Phase II Height
95' MAX BUILDING HEIGHT PHASE 1
el. +634
el. +536
+ el. 569 ft
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
SEVENTH FLOOR
MAX BLDG HEIGHT PLANE
(20' x 20' GRID)
el. +537.5
el. +540 ft
MEZZANINE/
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
SEVENTH FLOOR
EIGHTH FLOOR
GROUND FLOOR
MEZZANINE/
SECOND FLOOR
EIGHTH FLOOR
PROPOSED: 4.06 FAR
349,403 SF TOTAL
95 FT HEIGHT
GROUND FLOOR
PROPOSED: 4.06 FAR
307,530 SF TOTAL
95 FT HEIGHT
el. +545 ft
MAX BLDG HEIGHT PLANE
(20' x 20' GRID) el. +631 ft
ALLOWED: 3.0 FAR BY RIGHT
PROPOSED: 4.06 FAR
656,933 SF TOTAL
TOTAL PHASE I & II
92' MAX BUILDING HEIGHT PHASE 2
4.1.2 - MAXIMUM HEIGHT BY
RIGHT
4.1.2 - MAXIMUM FAR BY RIGHT
el. +539
ALLOWED: 3.0 FAR BY RIGHT
95 FT MAX HEIGHT
ALLOWED: 3.0 FAR BY RIGHT
95 FT MAX HEIGHT
DSP/MO
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:30:31 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.12
SETBACKS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4.1.3 - BUILDING SETBACKS
Diagram - Phase I Setbacks
Diagram - Phase II Setbacks
10 FT SETBACK
FROM CURB
13 FT FRONT SETBACK
FROM CURB
28 FT DRIVE AISLE
20FT PASEO
15 FT FRONT SETBACK
FROM CURB
4 FT SIDE SETBACK
BEFORE 20 FT PASEO
13 FT FRONT SETBACK
____ PHASE 1 & 2 SEPARATION
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PUBLICILY ACCESSIBLE
OPEN SPACE
SIDEWALK
PARKWAY
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:30:43 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.13
PARKWAY &
SIDEWALKS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4.1.3 - PARKWAYS &
SIDEWALKS
5.4.2 - PASEOS
Diagram - Phase I Parkways
Diagram - Phase II Parkways
10' SIDEWALK
5' PARKWAY
4' PARKWAY
6' SIDEWALK
5' PARKWAY
8' SIDEWALK
BUILDING ADJACENT
ZONE 3 FT
BUILDING ADJACENT
ZONE 3 FT
BUILDING ADJACENT
ZONE 3 FT
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025 5 06/13/25 Stage II Update
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PUBLICILY ACCESSIBLE
OPEN SPACE
COMMON OPEN SPACE
PARKWAY
SIDEWALK
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 6/13/2025 11:30:35 AM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
A0.14a
PUBLIC OPEN
SPACE
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
COMBINED:
13,397 SF
PUBLICILY ACCESSIBLE OPEN
SPACE
38,611 SF
COMMON OPEN SPACE
9,966 SF
CONTIGUOUS SPACE
Diagram - Phase I Open Space
4.1.3 - PARKWAYS &
SIDEWALKS
4.1.4 - PUBLICILY ACCESSIBLE
OPEN SPACE
5.4.1 - COURTYARDS &
PLAZAS
5.4.2 - PASEOS
Diagram - Phase II Open Space
2118 SF
PAOS
4806 SF
PAOS
1625 SF
COMMON
OPEN SPACE
1435 SF
COMMON
OPEN SPACE
4070 SF
COMMON
OPEN SPACE
3707 SF
COMMON
OPEN SPACE
5,173 SF
PAOS
PHASE II
1313 SF
PAOS
6436 SF
COMMON OPEN
SPACE
840 SF
COMMON
OPEN SPACE
1601 SF
COMMON OPEN
SPACE
4,793 SF
PAOS
PHASE I
1327 SF
COMMON OPEN
SPACE
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
STOP
STOP STOP
STOP
STOP
STOP
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
LEXINGTON DRIVE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
19' x11' CLEARANCE
19' x11' CLEARANCE
IV
CHLK FENCE
UV
U VLT
U VLT
UMH
W RISR(2)
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
LEXINGTON DRIVE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
STOP
STOP STOP
STOP
STOP
STOP
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
19' x11' CLEARANCE
19' x11' CLEARANCE
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
POOL
SPA
SPA
STOP
STOP STOP
STOP
STOP
STOP
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
19' x11' CLEARANCE
19' x11' CLEARANCE
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
STOP
STOP STOP
STOP
STOP
STOP
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
LEXINGTON DRIVE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
19' x11' CLEARANCE
19' x11' CLEARANCE
IV
CHLK FENCE
UV
U VLT
U VLT
U VLT
UMH
W RISR
W RISR(2)
TSPB
TSPB TSPB
2X
FDC(2)
E VLT
E VLT
546.23 Rim
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
WILSON AVENUE
LEXINGTON DRIVE
SALEM ST.
ALLEY ALLEY
4 34
ORANGE ST.
CALIFORNIA AVENUE
CENTRAL AVENUE
SALEMST.
2.0%
2118 SF
Public Open Space
2209 SF
Public Open Space
4849 SF
Public Open Space
1313 SF
Public Open Space
Potential Future Public Park
Open Space
Common Open Space
Potential Future Public Park
Public Open Space
Public Open Space - Covered
30'x40'
PLAZA
30'x40'
PLAZA
30'x40'
PLAZA
30'x40'
PLAZA
16 SF
Public Open Space - Covered
81 SF
Public Open Space - Covered
22 SF
Public Open Space - Covered
153 SF
Public Open Space - Covered
74 SF
Public Open Space - Covered
75 SF
Public Open Space - Covered
1'-8"
5'-11"
2'-3"
12'-0"
10'-11"
14'-9"
1'-5"
148 SF
Public Open Space - Covered
12'-7"
2'-0"
5'-0"
8'-9"
2'-0"
600 SF
Public Open Space - Covered
1739 SF
Public Open Space
18'-5"
30'-6"
25'-2"
Shade Structure
Canopy
Building Overhang
Balcony
Balcony
Balcony
Balcony
Building Overhang
4070 SF
Common Open Space
1625 SF
Common Open Space
3707 SF
Common Open Space
16982 SF
Common Open Space
6436 SF
Common Open Space
840 SF
Common Open Space
1327 SF
Common Open Space
588 SF
Common Open Space
1435 SF
Common Open Space
1601 SF
Common Open Space
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 6/13/2025 11:49:14 AM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
A0.14b
OPEN SPACE
CALCULATIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1" = 50'-0" A0.14b
LEVEL 1 1
SCALE: 1" = 50'-0" A0.14b
LEVEL 2 2
SCALE: 1" = 50'-0" A0.14b
LEVEL 6 3
SCALE: 1" = 50'-0" A0.14b
LEVEL 8 4
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:31:28 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.15
HEIGHT
MODULATION
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
MODULATION: Roofline height
of at least 10 ft for every 150
linear feet
4.2.2 - HEIGHT MODULATION
Diagram - Phase I Height Modulation
Diagram - Phase II Height Modulation
STAIR OVERRUN: Integrated into
overall architectural design
MODULATION: Roofline
height of at least 10 ft for
every 150 linear feet
MODULATION: Roofline
height of at least 10 ft for
every 150 linear feet
STAIR OVERRUN: Integrated into
overall architectural design
MODULATION: Roofline height
of at least 10 ft for every 150
linear feet
MODULATION: Roofline
height of at least 10 ft for
every 150 linear feet
LANDMARK ARCHITECTURAL
FEATURE: Entry corner
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:31:39 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.16
FACADE
MODULATION
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4.2.3 - MASSING & SCALE:
FACADE MODULATION
Diagram - Phase I Facade Modulation
Diagram - Phase II Facade Modulation
MAJOR MODULATION
22' X 13'-5"
MINOR MODULATION
5'-4" X 1'-4"
MINOR MODULATION
27'-10" X 1'-8"
MAJOR MODULATION
38'-6" X 4'-8"
MAJOR
MODULATION
4'-3" X 2'-2"
MAJOR MODULATION
4'-3" X 2'-2"
MAJOR
MODULATION
6'-3" X 6'
MAJOR MODULATION
6' X 5'
MAJOR
MODULATION
11'-8" X 4'-6"
MAJOR MODULATION
26' X 8'-8"
MINOR MODULATION
26' X 1'2" ; 38' X 2'-6"
MAJOR MODULATION
13' X 8'-6"
MAJOR MODULATION
13'-6" X 5'
MAJOR MODULATION
10' X 4'-4"
MINOR MODULATION
69' X 1'-2'
MINOR
MODULATION
63' X 1'-4"
MAJOR
MODULATION
55' X 8'-4"
MINOR
MODULATION
80' X 1'-4"
MAJOR MODULATION
8'-2" X 4'-4'
MAJOR MODULATION
7' X 2'-6"
MAJOR MODULATION
11'-6" X 6'
MINOR
MODULATION
69' X 1'-2"
MAJOR
MODULATION
11'-6" X 6'
MAJOR
MODULATION
11'-6" X 6'
MAJOR
MODULATION
5' X 4'-6"
CANOPIES
MAJOR
MODULATION
26'-9" X 17'-8"
MAJOR MODULATION
6' X 4'-6" MAJOR MODULATION
9'-4" X 6'
MAJOR MODULATION
4'-6" X 12'-4"
MAJOR MODULATION
28'-4" X 3'
MINOR MODULATION
65' X 1'-5'
MAJOR MODULATION
14' X 4'-6'
MAJOR
MODULATION
12'-7" X 4'-3' MAJOR
MODULATION
12' X 5'
MAJOR MODULATION
3'-8" X 6'-6"
MAJOR MODULATION
11'-6" X 5'-9"
MAJOR
MODULATION
4'-8" X 2'-2"
ARCADE
MAJOR MODULATION
9'-4" X 4'-4"
MAJOR
MODULATION
9'-2" X 4'-4"
MAJOR MODULATION
9'-7" X 6'
MAJOR MODULATION
12' X 4'-6"
MAJOR MODULATION
12'-4" X 4'-6"
MAJOR
MODULATION
12'-4" X 4'-6"
MAJOR
MODULATION
11' 6' X 4'-6"
BALCONIES
MAJOR
MODULATION
9'-9" X 16'-7"
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:31:50 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.17
BUILDING
SEPARATIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4.2.4 - BUILDING SEPARATIONS
Diagram - Phase II Separations
Diagram - Phase I Separations
BUILDING SEPARATION
PROVIDED (MIN. 40 FT)
BUILDING SEPARATION
PROVIDED (MIN. 40 FT) BUILDING SEPARATION
PROVIDED (MIN. 40 FT)
BUILDING SEPARATION
PROVIDED (MIN. 40 FT)
BUILDING SEPARATION
PROVIDED (MIN. 40 FT)
4 07/23/24 Stage II Submission - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:32:02 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.18
ARCHITECTURAL
ELEMENTS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Diagram - Phase I
Diagram - Phase II
4.2.7 - ARCHITECTURAL
ELEMENTS
A. BUILDING FAÇADE USES
ARCHITECTURAL SOLUTIONS
TO ARTICULATE THE FAÇADE
B. FAÇADE CONSTRUCTED
OF HIGH QUALITY
MATERIALS AND DETAILS
C. PARKING ENTRY VISIBLE
FROM STREET FRONTAGE
D. DESIGN OF THE BUILDING
FAÇADE ADDRESSES THE
PUBLIC SIDEWALK
E. GROUND LEVEL FAÇADE
AUGMENTED WITH OPEN
SPACE IMPROVEMENTS
F. LARGE EXPANSES OF
GLASS SUBDIVIDED INTO
SMALLER UNITS
G. DIFFERENTIATION
PROVIDED AT BASE AND
TOP OF WINDOWS
H. GROUND LEVEL VISUALLY
SEPARATED BY AWNINGS,
CANOPIES, AND GROUND
LEVEL BUILDING RECESS
I. LANDSCAPING; REFER TO
LANDSCAPE ARCHITECT’S
DRAWINGS
H. GROUND LEVEL VISUALLY
SEPARATED BY AWNINGS,
CANOPIES, AND GROUND
LEVEL BUILDING RECESS
G. DIFFERENTIATION
PROVIDED AT BASE AND
TOP OF WINDOWS
E. GROUND LEVEL FAÇADE
AUGMENTED WITH OPEN
SPACE IMPROVEMENTS
F. LARGE EXPANSES OF
GLASS SUBDIVIDED INTO
SMALLER UNITS
D. DESIGN OF THE BUILDING
FAÇADE ADDRESSES THE
PUBLIC SIDEWALK
B. FAÇADE CONSTRUCTED
OF HIGH QUALITY
MATERIALS AND DETAILS
A. BUILDING FAÇADE USES
ARCHITECTURAL SOLUTIONS
TO ARTICULATE THE FAÇADE
J. GROUND FLOOR USE
REQUIREMENTS ADDRESSED;
MIXED USE RESIDENTIAL
I. LANDSCAPING; REFER TO
LANDSCAPE ARCHITECT’S
DRAWINGS
J. GROUND FLOOR USE
REQUIREMENTS ADDRESSED;
MIXED USE COMMERCIAL
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:32:13 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A0.20
MATERIALS,
FENESTRATION,
ETC.
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4.2.8 - MATERIALS
4.2.9 - STOREFRONTS
4.2.10 - BUILDING LOBBIES &
ENTRIES
4.2.13 - CANOPIES
4.2.14 - BALCONIES
4.2.15 - FENESTRATION
Diagram - Phase I Materials
Diagram - Phase II Materials
METAL PANEL AND
STROEFRONT GLAZING
HIGH QUALITY MASONRY/
BRICK FACADE WITH STONE
AND METAL PANEL ACCENTS
LARGE MASONRY TILE
MINIMUM 75% TRANSPARENCY
ON ALL STOREFRONT FACADES
WOOD-LOOKING
FINISH AT STOOPS
ENTRANCE PROVIDES RECESS FROM
FACADE, IS VISIBLE AND CONNECTED
ALONG PUBLIC STREET, AND
SIGNIFICANT DESIGN FEATURES
METAL PANEL SYSTEM
METAL PANEL SYSTEM
LARGE SCALE
MASONRY TILE
HIGH QUALITY MASONRY/
BRICK FACADE WITH STONE
AND METAL PANEL ACCENTS
METAL PANEL SYSTEM
METAL PANEL SYSTEM
ENTRANCE PROVIDES RECESS FROM
FACADE, IS VISIBLE AND CONNECTED
ALONG PUBLIC STREET, AND
SIGNIFICANT DESIGN FEATURES
ENTRANCE PROVIDES RECESS FROM
FACADE, IS VISIBLE AND CONNECTED
ALONG PUBLIC STREET, AND SERVES
AS A NAVIGATIONAL DESIGN FEATURE
ENTRANCE PROVIDES RECESS FROM
FACADE, IS VISIBLE AND CONNECTED
ALONG PUBLIC STREET, AND SERVES
AS A SIGNIFICANT DESIGN FEATURE
FACADE MATERIALS
INTEGRATE INTO
LANDSCAPING ELEMENTS
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
Trash
Trash
Trash
Trash
Trash
LW
LW
1BD 1BD LW LW LW LW LW 1BD
2BD
1BD
2BD
Virtual Golf
Elec. Room #3
1BD
Lobby
LW 1BD LW LW LW LW
Lobby
LW
LW
2BD
LW
Retail
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
1BD 1BD
Transformer
Room
Main Elec.
Room Dom. & Fire
Pump Room
Elec. Room #2
Fitness
Flex Space /
Business
Lounge
Dog Spa
Office CONF.
1BD
1BD
Pool Equip.
Room
FC
Office
WK/ BK RM PARCEL
COLD
BIKE STOR.
FC
BIKE
PARCEL
COLD
WK/ BK RM
LOBBY/
GAMING
MPOE
RR
LW
BIKE
RR
+541.0 +540.0
+539.0
+538.0
+537.0
+536.0
+540.0 +541.0
+537.5
+537.5
+538.0
+539
+539
+544
+543
+539.0
+536.0
+541.0
+539
+536
+543 +539
+543
+544.5
+539
10.8%
+543 5% MAX 2% MAX
8%
+539
+539
2% MAX
+541.0
+539 POOL
ABOVE
LEVEL 1 PARKING
116 SPACES (17 IN-UNIT)
LOADING
LOADING
DN TO LEVEL P1
Entry
Entry
Entry
Entry
DN TO LEVEL P1
15%
15%
2.5%
GATE
6.4%
Entry
LOADING
LOADING
POOL
ABOVE
SPA
ABOVE
FLOOR ABOVE
13'-6"
CLEAR HEIGHT
UNDER STRUCTURE
FLOOR ABOVE
13'-6"
CLEAR HEIGHT
UNDER STRUCTURE
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
ALLEY
ROUTE IN
ROUTE OUT
ROUTE IN
ROUTE OUT
GATE
GATE
O
T
R
T
R
O
R
R
T R
T
T
O R T
R
R
R
T
T
T
O R T
R T
R T
R T
O R T
R
T
R
T
T
R
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
LEGEND
TRASH HAULER PATH OF TRAVEL
5-YARD TRASH BIN
(W4.5' x L6' x H5')
O (ORGANIC)
R (RECYCLE)
T (TRASH)
BIN MOVER PATH OF TRAVEL
TRASH LOADING AREA
(CURBSIDE)
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 6/13/2025 11:29:28 AM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
A0.21
TRASH SERVICE
ACCESS PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
Trash
Trash
Trash
Trash
Trash
LW
LW
1BD 1BD LW LW LW LW LW 1BD
2BD
1BD
2BD
Virtual Golf
Elec. Room #3
1BD
Lobby
LW 1BD LW LW LW LW
Lobby
LW
LW
2BD
LW
Retail
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
1BD 1BD
Transformer
Room
Main Elec.
Room Dom. & Fire
Pump Room
Elec. Room #2
Fitness
Flex Space /
Business
Lounge
Dog Spa
Office CONF.
1BD
1BD
Pool Equip.
Room
FC
Office
WK/ BK RM PARCEL
COLD
BIKE STOR.
FC
BIKE
PARCEL
COLD
WK/ BK RM
LOBBY/
GAMING
MPOE
RR
LW
BIKE
RR
+541.0 +540.0
+539.0
+538.0
+537.0
+536.0
+540.0 +541.0
+537.5
+537.5
+538.0
+539
+539
+544
+543
+539.0
+536.0
+541.0
+539
+536
+543 +539
+543
+544.5
+539
10.8%
+543 5% MAX 2% MAX
8%
+539
+539
2% MAX
+541.0
+539 POOL
ABOVE
LEVEL 1 PARKING
116 SPACES (17 IN-UNIT)
LOADING
LOADING
DN TO LEVEL P1
Entry
Entry
Entry
Entry
DN TO LEVEL P1
15%
15%
2.5%
6.4%
GATE
GATE
Entry
LOADING
LOADING
POOL
ABOVE
SPA
ABOVE
FLOOR ABOVE
13'-6"
CLEAR HEIGHT
UNDER STRUCTURE
FLOOR ABOVE
13'-6"
CLEAR HEIGHT
UNDER STRUCTURE
CENTRAL AVENUE
ORANGE STREET
CALIFORNIA AVENUE
ALLEY
24' - 5 3/4"
RESERVOIR SPACE
38' - 0"
42" HEIGHT RESTRICTION
FOR LINE OF SIGHT
42" HEIGHT RESTRICTION
FOR LINE OF SIGHT
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
LEGEND
22 FT PANEL TRUCK
PATH OF TRAVEL (12 FT MAX HT)
TENANT PATH
OF TRAVEL
LOADING AREA
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 6/13/2025 11:30:01 AM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
A0.22
TENANT LOADING
ACCESS PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:32:24 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A1.00
EXISTING SITE
SURVEY PAGE 1
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:32:35 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A1.01
EXISTING SITE
SURVEY PAGE 2
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PROJECT SITE
SCALE: 1" = 30'
FOR 30" x 42" DOCUMENT
SCALE: 1" = 100'
FOR 11" x 17" DOCUMENT
N 0 20' 40' 80'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:32:46 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A1.03
EXISTING SITE
PLAN / AERIAL
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
SCALE: 1" = 30'
FOR 30" x 42" DOCUMENT
SCALE: 1" = 100'
FOR 11" x 17" DOCUMENT
N 0 20' 40' 80'
Program Legend
1 Bedroom
2 Bedroom
Amenity
Live / Work
Retail
Utility
PLAZA PLAZAPASEO
PHASE I
20'-0"
28'-0" 3'-5"
POTENTIAL FUTURE PUBLIC PARK
PHASE II
CONSTRUCTION STAGING AREA
VEHICULAR
ENTRY
VEHICULAR
ENTRY
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:33:01 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A1.04
PHASE I SITE PLAN
/ AERIAL
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
Program Legend
1 Bedroom
2 Bedroom
Amenity
Live / Work
Retail
Utility
PLAZA PLAZA
PLAZA PLAZAPASEO 4'-0"10'-0" 10'-0" 10'-0"
PHASE 1
PHASE 2
20'-0"
20'-0"
11'-6" 10'-0" 10'-0" 10'-0"4'-3"
8'-6"8'-6" 8'-6"
CLCL
18'-0" 1'-0" 18'-0"
28'-0" 3'-5"
PASEO
VEHICULAR
ENTRY
VEHICULAR
ENTRY
POTENTIAL FUTURE PUBLIC PARK
SCALE: 1" = 30'
FOR 30" x 42" DOCUMENT
SCALE: 1" = 100'
FOR 11" x 17" DOCUMENT
N 0 20' 40' 80'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:33:16 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A1.05
PHASE II SITE
PLAN / AERIAL
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
1 A4.0
5 A4.2
6 A4.2
2 A4.2
1 A4.2
3 A4.3
4 A4.2
4 A4.3
1 A4.3
2 A4.3
3 A4.2
LEVEL P2 PARKING
413 SPACES
PHASE 1
PHASE 2
UP TO
LEVEL P1
UP TO
LEVEL P1
15%
15%
38 38
1462 SF
Private Storage
717 SF
Private Storage
1 A4.1
2 A4.1
2 A4.0
MECH
SUPPLY
MECH
EXHAUST
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:08:34 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.00
P2 PARKING PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
1 A4.0
5 A4.2
6 A4.2
2 A4.2
1 A4.2
3 A4.3
4 A4.2
4 A4.3
1 A4.3 2
A4.3
3 A4.2
LEVEL P1 PARKING
401 SPACES
PHASE 1
PHASE 2
UP TO
LEVEL 1
DN TO
LEVEL P2
UP TO
LEVEL 1
DN TO
LEVEL P2
15%
15%
15%
38 38
1462 SF
Private Storage
717 SF
Private Storage
1 A4.1
2 A4.1
2 A4.0
2 A3.6
1 A3.7 2
A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
MECH
SUPPLY
MECH
EXHAUST
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:08:43 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.01
P1 PARKING PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
1 A4.4
44 55
66 77
88 99
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
422 SF
Virtual Golf
Trash
Elec. Room #3
Trash
35 35
1 A9.1 1
A9.1
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+541.0 +540.0
+539.0
+538.0
+537.0
+536.0
+540.0
+541.0
+537.5
+537.5
+538.0
4 A4.2
4'-0" 10'-0" 10'-0" 10'-0"
1BD
4035 SF
Lobby
LW 1BD LW LW LW LW LW
1BD 1BD
1793 SF
Lobby
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
116 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
20'-0"
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
1521 SF
Fitness
1922 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
423 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
38 38
127 SF
CONF.
155 SF
Office
Lobby
+539
+539
+544
+543
+539.0
+536.0
+541.0
2.5%
6.4%
+539
+536
11'-6" 10'-0" 10'-0" 10'-0" 4'-3"
GATE
GATE
VAN
VAN
+543 +539
+543
+544.5
Mail
Mail Entry
2 A4.4
8'-6" 8'-6" 8'-6" CL CL 18'-0" 1'-0" 18'-0"
1 A4.5
2 A4.5
1 A4.6
2 A4.6
1 A4.1
1 A4.1
2 A4.1
30'-0"
42'-6 1/2"
40'-0"
30'-0"
30'-0"
1,515 SF
Outdoor Dining
200 SF
13' - 3 1/4"
7' - 7 7/8"
5' - 10 1/4"
Trash
1BD
1BD
3'-0"
Pool Equip.
Room
Program Legend
1 Bedroom
2 Bedroom
Amenity
Live / Work
Retail
Utility
(10)
BIKE PARKING (10)
2 A4.0 2
A4.0
9' - 6 1/2"
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
-
34 A3.6
34 A3.7
34 A3.8
34 A3.9
MECH
SUPPLY
MECH
EXHAUST
PRIVATE
GARAGE
+539
10.8%
3' - 0"
+543 5% MAX 2% MAX
8%
+539
+539
2% MAX
+541.0
+539
LOADING
LOADING
LW
-
1 A3.2
1 A3.3
1 A3.4
1 A3.5
LOBBY/
GAMING
1 A4.7
2 A4.7
1 A4.8
2 A4.8
GATE
OTR
TRORRT
RTT
O
R
T
RRRTTT
O
R
T
R
T
R
T
R
T
O
R
T
RTRTTR
-
----
---
-
----
---
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23 4 08/08/25 Stage II Update
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 8/8/2025 11:01:43 PM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
08/08/2025
A2.10
GROUND LEVEL
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1
LEVEL 1
LEVEL 1
LEVEL 1
LEVEL 1
LEVEL 1
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
1 A4.4
44 55
66 77
88 99
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
1506 SF
Club Room
2BD 2BD
2BD
1BD
1BD 1BD
1BD
1BD
1BD
676 SF
Amenity
1BD
1BD
1BD
1BD
1BD 1BD 1BD 1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1073 SF
Business
Center
35 35
1 A9.1 1
A9.1
1BD
1BD
5 A4.2
17' - 5"
14' - 5"
3BD
2BD 1BD
1BD
1BD 1BD 1BD 1BD 1BD 1BD 1BD
1BD
1BD 1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD 1BD
1BD
ST
ST
1BD
1BD
1BD
1BD
1BD
1BD
1BD
2BD
PHASE 1
PHASE 2
O.T.B.
O.T.B.
O.T.B.
O.T.B.
O.T.B.
O.T.B.
O.T.B.
O.T.B.
2166 SF
Club Room
38 38
Private Storage
O.T.B.
1BD
2 A4.4
1 A4.5
2 A4.5
1 A4.6
2 A4.6
1 A4.1
1 A4.1
2 A4.1
2 A4.1
ST
O.T.B.
Program Legend
1 Bedroom
2 Bedroom
3 Bedroom
Amenity
Live / Work
Retail
Storage
Studio
Utility
1BD LW LW LW LW LW LW
LW
LW
LW
LW
LW
LW LW LW LW LW
O.T.B. O.T.B.
O.T.B.
Private Storage
2 A4.0
--
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
-
34 A3.6
34 A3.7
34 A3.8
34 A3.9
-
-
-
--
-
1 A3.2A
1 A3.3A
1 A3.4A
1 A3.5A
1453 SF
Fitness
1 A4.7
2 A4.7
1 A4.8
2 A4.8
TRO
O
R
T
O
R
T
O
R
T
Trash Rm.
Trash Rm.
Trash Rm.
Trash Rm.
-
----
---
-
---
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
LEVEL 2
LEVEL 2
LEVEL 2
LEVEL 2
LEVEL 2
LEVEL 2 LEVEL 2 LEVEL 2
LEVEL 2 LEVEL 2 LEVEL 2
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23 4 08/08/25 Stage II Update
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 8/8/2025 11:02:07 PM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
08/08/2025
A2.20
SECOND FLOOR
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
55 66
77 88
99 10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
2BD
2BD
2BD
2BD
2BD 2BD
2BD
2BD 2BD 2BD
2BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
ST
1BD 1BD 1BD
JR 1B
1BD 1BD 1BD
ST
1BD
1BD
1BD 1BD
1BD
1BD
O.T.B.
O.T.B.
Program Legend
1 Bedroom
2 Bedroom
Open Space
Storage
Studio
35 35
1 A4.0
1BD
1BD
O.T.B.
2BD
1BD
2BD
1BD
1BD
1BD 1BD
1BD
1BD 1BD 1BD 1BD 1BD 1BD 1BD
1BD 2BD 1BD 1BD
1BD
2BD
2BD
2BD
Private Terrace
1BD
ST
1BD
1BD
1BD ST 1BD
1BD
1BD
1BD
2BD
1BD
ST
1BD
1BD
1BD
1BD
1BD
1BD
1BD
2BD
2BD
1BD
1BD
1BD
1BD
PHASE 1
PHASE 2
38 38
Private Storage
1 A4.1
1 A4.1
2 A4.1
CL
35'-1 55/64"
27'-3 1/64"
Private Terrace
Private Storage
2 A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
2BD
2BD
Private Storage
Private Storage
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:09:18 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.30
THIRD FLOOR
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
2BD
1BD 1BD
1BD
2BD
2BD
1BD
2BD
2BD
2BD
2BD 1BD
1BD 1BD 2BD
1BD
ST
1BD 1BD
ST
1BD 1BD
ST
1BD
2BD
1BD
1BD
1BD
1BD
1BD 1BD 1BD
1BD 1BD
ST
1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
2BD
2BD
2BD
2BD
2BD 2BD
2BD
2BD 2BD 2BD
2BD
1BD 1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
ST
1BD 1BD 1BD
JR 1B
JR 1B
JR 1B
1BD 1BD 1BD
ST
1BD
1BD
1BD 1BD
1BD
1BD
1BD
Program Legend
1 Bedroom
2 Bedroom
Storage
Studio
1 A4.0 1
A4.0
1BD 1BD 1BD
1BD
1BD
1BD
PHASE 1
PHASE 2
Private Storage
Private Storage
1 A4.1
2 A4.1
2 A4.1
2 A4.0 2
A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
2BD
2BD
1BD
Private Storage
Private Storage
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:09:29 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.40
FOURTH FLOOR
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
2BD
1BD 1BD
1BD
2BD
2BD
1BD
2BD
2BD
2BD
2BD 1BD
1BD 1BD 2BD
1BD
ST
1BD 1BD
ST
1BD 1BD
ST
1BD
2BD
1BD
1BD
1BD
1BD
1BD 1BD 1BD
1BD 1BD
1BD
1BD ST
1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
2BD
2BD
2BD
2BD
2BD 2BD
2BD
2BD 2BD 2BD
2BD
1BD 1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
ST
1BD 1BD 1BD
JR 1B
JR 1B
JR 1B
1BD 1BD 1BD
ST
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1 A4.0 1
A4.0
1BD 1BD 1BD
1BD
1BD
1BD
PHASE 1
PHASE 2
Private Storage
Private Storage
1 A4.1
1 A4.1
2 A4.1
2 A4.1
Program Legend
1 Bedroom
2 Bedroom
Storage
Studio
2 A4.0 2
A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
2BD
2BD
Private Storage
Private Storage
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:09:40 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.50
FIFTH FLOOR PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
2BD
1BD 1BD
2BD
1BD
1BD
2BD
2BD
2BD 2BD
2BD 1BD 1BD
ST
ST
1BD 1BD
ST
1BD 1BD
ST
1BD
2BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD 1BD
1BD
1BD ST
1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
2BD
2BD
2BD
2BD 2BD
2BD 2BD 2BD
2BD
1BD 1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
710 SF
1BD
1BD 1BD 1BD
JR 1B
JR 1B
JR 1B
1BD 1BD 1BD
ST
1BD
1BD
1BD 1BD
1BD
873 SF
Roof Deck
1371 SF
Roof Deck
Program Legend
1 Bedroom
2 Bedroom
Open Space
Storage
Studio
1 A4.0 1
A4.0
1BD 1BD 1BD
1BD
1BD
2BD
2BD
1BD
1BD
1BD
PHASE 1
PHASE 2
Private Storage
Private Storage
1 A4.1
1 A4.1
2 A4.1
2 A4.1
Private Terrace Private Terrace
2 A4.0 2
A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
2BD
2BD
Private Storage
Private Storage
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:09:51 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.60
SIXTH FLOOR
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
2BD
1BD 1BD
2BD
1BD
1BD
2BD
2BD
2BD 2BD
2BD 1BD 1BD
ST
ST
1BD 1BD
ST
1BD 1BD
ST
1BD 1BD 2BD
1BD
1BD
1BD
1BD 1BD 1BD
1BD 1BD
1BD
1BD ST
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
2BD
2BD
2BD
2BD 2BD
1BD
2BD 2BD 2BD
2BD
1BD 1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD 1BD 1BD
JR 1B
JR 1B
JR 1B
1BD 1BD 1BD
ST
1BD
1BD
1BD
1BD
1BD
2BD
2BD
Program Legend
1 Bedroom
2 Bedroom
Storage
Studio
1 A4.0 1
A4.0
1BD 1BD 1BD
1BD
1BD
1BD
1BD
PHASE 1
PHASE 2
Private Storage
Private Storage
1 A4.1
1 A4.1
2 A4.1
2 A4.1
2 A4.0 2
A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
2BD
2BD
1BD
Private Storage
Private Storage
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:10:03 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.70
SEVENTH FLOOR
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
1 A4.4
2BD
1BD
2BD
1BD
2BD
2BD
2BD 2BD 1BD 1BD 1BD
1BD 1BD
ST
1BD 1BD
ST
1BD
2BD
1BD
1BD
1BD
1BD
1BD 1BD 1BD 1BD 1BD
1BD
1BD ST
1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
2BD
2BD
2BD
2BD 2BD
1BD
2BD 2BD 2BD
1680 SF
Roof Deck
1BD 1BD 1BD
1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD 1BD 1BD
1BD 1BD 1BD 1BD
ST
1BD
1BD
1BD 1BD
1BD
2BD
2BD
1 A4.0 1
A4.0
ST
1464 SF
Roof Deck
1BD 1BD 1BD
1BD
1BD
1BD
1BD
1BD
PHASE 1
PHASE 2
Private Storage
Private Storage
2 A4.4
1 A4.5
2 A4.5
1 A4.6
2 A4.6
1 A4.1
1 A4.1
2 A4.1
2 A4.1
Program Legend
1 Bedroom
2 Bedroom
Open Space
Storage
Studio
2 A4.0 2
A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
-
34 A3.6
34 A3.7
34 A3.8
34 A3.9
--
2BD
2BD
1BD
Private Storage
Private Storage
1 A4.7
2 A4.7
1 A4.8
2 A4.8
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:10:14 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.80
EIGHTH FLOOR
PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Unit Tabulations
Unit Type Count
LEVEL 1
1 Bedroom 7
2 Bedroom 2
Live / Work 7
16 LEVEL 1 EAST
1 Bedroom 3
2 Bedroom 1
Live / Work 9
13 LEVEL 2
1 Bedroom 25
2 Bedroom 3
Studio 1
29 LEVEL 2 EAST
1 Bedroom 28
2 Bedroom 2
3 Bedroom 1
Studio 2
33 LEVEL 3
1 Bedroom 34
2 Bedroom 11
Studio 2
47 LEVEL 3 EAST
1 Bedroom 36
2 Bedroom 11
Studio 3
50 LEVEL 4
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 5
1 Bedroom 74
2 Bedroom 22
Studio 6
102
LEVEL 6
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 7
1 Bedroom 71
2 Bedroom 21
Studio 6
98 LEVEL 8
1 Bedroom 70
2 Bedroom 19
Studio 5
94 Grand total: 682
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
1 A4.0
1 A4.0
POTENTIAL SOLAR AREA
ELEV
OVERRUN
ELEV
OVERRUN
ELEV
OVERRUN
ELEV
1 OVERRUN
A4.1
1 A4.1
2 A4.1
2 A4.1
POTENTIAL SOLAR AREA
2 A4.0
2 A4.0
1 A3.6
2 A3.6
1 A3.7
2 A3.7
1 A3.8
2 A3.8
1 A3.9
2 A3.9
SCALE: 1/16" = 1'-0"
FOR 30" x 42" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
N
0 10' 20' 40'
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 5:10:25 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A2.90
ROOF PLAN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:35:29 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.0
ENLARGED UNIT
PLANS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
S-1
1 BED / 1 BATH
3% of 682 UNITS
1B-1
1 BED / 1 BATH
21% of 682 UNITS
1B-2
1 BED / 1 BATH
9% of 682 UNITS
1B-3
1 BED / 1 BATH
9% of 682 UNITS
1B-4
1 BED / 1 BATH
12% of 682 UNITS
1B-5
1 BED / 1 BATH
9% of 682 UNITS
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:35:42 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.1
ENLARGED UNIT
PLANS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.1
1 Unit Options - 2 Bedroom, 3 Bedroom,
Live/Work
2B- Corner
2 BED / 2 BATH
8% of 682 UNITS
2B-1
2 BED / 2 BATH
8% of 682UNITS
3B-1
3 BED / 3 BATH
0.6% of 682 UNITS
LW-1
1 BED / 1 BATH
3% of 682 UNITS
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
34 34
PLAZA
4035 SF
Lobby
LW
Trash
Entry
1919 SF
Fitness
127 SF
CONF.
155 SF
Office
+539
VAN
VAN
+544.5
Mail
30'-0"
222 SF
FC
365 SF
WK/ BK RM
428 SF
PARCEL
262 SF
COLD
155 SF
Office
RR
RR
BIKE
CLIMBING
WALLS
MIRRORS
MIRRORS
MIRRORS
MIRRORS
MIRRORS
MIRRORS
MIRRORS
GRAPHICS
O.T.A.
O.T.A.
O.T.A.
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:35:55 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.2
ENLARGED
BUILDING PLANS -
A LEVEL 1
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.2
ENLARGED FLOOR PLAN - A 1
ORANGE STREET
CALIFORNIA AVENUE
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
14 14
15 15
17 17
18 18
19 19
20 20
21 21
22 22
34 34
1BD 1BD
1BD
858 SF
2BD
O.T.B.
O.T.B.
1BD 1BD
1453 SF
Fitness
O.T.B.
STRETCH
STRETCH
CLIMBING
WALLS
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:36:07 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.2A
ENLARGED FLOOR
PLAN - A LEVEL 2
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.2A
LEVEL 2 - ENLARGED FLOOR PLAN 2ND LEVEL A.A 1
ORANGE STREET
CALIFORNIA AVENUE
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
7 7
18 18
19 19
20 20
21 21
22 22
34 34
1BD
2BD
1BD
422 SF
Virtual Golf
PLAZA
+541.0
1922 SF
Flex Space /
Business
Lounge
Entry
Lobby
+541.0
30'-0"
3'-0"
Pool Equip.
Room
272 SF
BIKE
Pool Above
172 SF
MPOE
87 SF
RR
Loading Dock
Pedestrian Walkway
1BD 1BD
Res. Corr.
Elev.
Res.
Corr.
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:36:21 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.3
ENLARGED
BUILDING PLANS -
B LEVEL 1
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.3
CENTRAL AVENUE ENLARGED FLOOR PLAN - B 1
CALIFORNIA AVENUE
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
7 7
19 19
20 20
21 21
22 22
34 34
1506 SF
Club Room
1BD 1BD 1BD
O.T.B.
O.T.B.
O.T.B.
GLASS RAILING
ELEV
LOBBY
381 SF
Dining Room
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:36:32 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.3A
ENLARGED
BUILDING PLANS -
B LEVEL 2
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.3A
LEVEL 2 - ENLARGED FLOOR PLAN 2ND LEVEL B.B 1
CENTRAL AVENUE
CALIFORNIA AVENUE
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
7 7
27 27
28 28
29 29
30 30
31 31
32 32
LW
LW 1BD
PLAZA
+536.0
PRIVATE
GARAGE
Lounge
Seating
20'-0"
Mail
Entry
42'-6 31/64"
377 SF
PARCEL
204 SF
COLD
126 SF
FC
3989 SF
LOBBY/
GAMING
DOWN TO GARAGE
UP TO RES.
UNITS
UP TO
2ND FLOOR
RR
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:36:46 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.4
ENLARGED
BUILDING PLANS -
C LEVEL 1
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.4
ENLARGED FLOOR PLAN - C 1 CENTRAL AVENUE
MID-BLOCK PASEO
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
27 27
28 28
29 29
30 30
31 31
2BD
1BD 1BD
1073 SF
Business
Center
1BD
O.T.B.
ST
LW
Glass
Railing
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:36:58 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.4A
ENLARGED
BUILDING PLANS
-C LEVEL 2
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.4A
LEVEL 2 - ENLARGED FLOOR PLAN 2ND LEVEL C.C 1
CENTRAL AVENUE
MID-BLOCK PASEO
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
14 14
15 15
16 16
17 17
28 28
29 29
30 30
31 31
32 32
35 35
PLAZA
+540.0
+539.0
LW LW LW
1BD 1BD
1793 SF
Lobby
Garage
Entry
Entry +539.0
+539
40'-0"
30'-0"
DOWN TO
GARAGE
UP TO RES.
UNITS
474 SF
BIKE STOR.
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:37:11 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.5
ENLARGED
BUILDING PLANS -
D LEVEL 1
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.5
ENLARGED FLOOR PLAN - D 1
MID-BLOCK PASEO / PRIVATE DRIVE
CALIFORNIA AVENUE
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
14 14
15 15
16 16
17 17
28 28
29 29
30 30
31 31
32 32
1BD
O.T.B.
LW
LW LW
LW
GLASS
RAILING
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:37:23 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.5A
ENLARGED
BUILDING PLANS -
D LEVEL 2
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A3.5A
LEVEL 2 - ENLARGED FLOOR PLAN 2ND LEVEL D.D 1 MID-BLOCK PASEO / PRIVATE DRIVE
CALIFORNIA AVENUE
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
10' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 14' - 5" 1 A8.0
2 A8.0
3 A8.0
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
PHASE II LOWEST
FD GRADE
0"
10' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 14' - 5" 4 A8.0
5 A8.0
6 A8.0
1a
6 1a
6 6
3 2b
MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:37:35 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.6
WALL SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 3/16" = 1'-0" A3.6
Wall Section 1 1
SCALE: 3/16" = 1'-0" A3.6
Wall Section 2 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
PHASE II LOWEST
FD GRADE
0"
14' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 5" 7 A8.0
8 A8.0
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
PHASE II LOWEST
FD GRADE
0"
14' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 5" 9 A8.0
1 A8.1
2 A8.1
2b
6 4 2c
1a
1b
1c
1a
MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:37:47 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.7
WALL SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 3/16" = 1'-0" A3.7
Wall Section 3 1
SCALE: 3/16" = 1'-0" A3.7
Wall Section 4 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
PHASE II LOWEST
FD GRADE
0"
10' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 14' - 5" 3 A8.1
4 A8.1
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
10' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 14' - 5" 9 A8.0
5 A8.1
5 1a
1a
4 MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:38:00 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.8
WALL SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 3/16" = 1'-0" A3.8
Wall Section 5 1
SCALE: 3/16" = 1'-0" A3.8
Wall Section 6 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
10' - 5" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 14' - 5" 6 A8.1
7 A8.1
8 A8.1
1 A8.2
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1" 10' - 1"
6 14' - 5"
A8.1
9 A8.0
2 A8.2
1a
5 1b
1c
4 1b
MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:38:13 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A3.9
WALL SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 3/16" = 1'-0" A3.9
Wall Section 7 1
SCALE: 3/16" = 1'-0" A3.9
Wall Section 8 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
LEVEL 1
PHASE I
LOWEST FIRE
DEPARTMENT GRADE
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
ROOF
T.O.P.
88'-10"
LEVEL P1
LEVEL P2
LEVEL 1 EAST
LEVEL 2 EAST
LEVEL 3 EAST
LEVEL 4 EAST
LEVEL 5 EAST
LEVEL 6 EAST
LEVEL 7 EAST
LEVEL 8 EAST
ROOF EAST
PHASE II LOWEST
FIRE DEPARTMENT
GRADE
T.O.P. EAST
91'-10"
PHASE II AB 330
AVERAGE GRADE
PHASE I AB330
LOWEST GRADE
HIGHEST POINT
PHASE II
HIGHEST POINT
PHASE I
LEVEL 1 PHASE I
LOWEST FIRE
DEPARTMENT GRADE
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
ROOF
LEVEL P1 LEVEL P1
LEVEL P2 LEVEL P2
4 5 6 7 8 9 10 11 12 13 14 15 17 16
74'-11" LAST OCCUPPIED FLOOR [NON-HIGHRISE]
9'-8" 10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" LEVEL 1 EAST
LEVEL 2 EAST
LEVEL 3 EAST
LEVEL 4 EAST
LEVEL 5 EAST
LEVEL 6 EAST
LEVEL 7 EAST
LEVEL 8 EAST
ROOF EAST
7'-0" 10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 11'-3" 10'-0"
PHASE II LOWEST
FIRE DEPARTMENT
GRADE
38 AMENITY
RESIDENTIAL
BUILDING RESIDENTIAL RESIDENTIAL
BEYOND
RESIDENTIAL RESIDENTIAL
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
COURTYARD
PODIUM COURTYARD
TRANSITION
BUILDING
BEYOND
SIDEWALK
SIDEWALK
CENTRAL
AVENUE
ORANGE
AVENUE
PHASE II PHASE I PHASE LINE
15% RAMP
15% RAMP
3'-0"
BUILDING
BEYOND
PRIVATE STORAGE
PRIVATE STORAGE
74'-11" LAST OCCUPIED FLOOR [NON-HIGHRISE]
TYPE III TYPE I
95'-0" MAX BUILDING HEIGHT
TYPE III TYPE I
9' - 1"
7'-0"
95'-0" MAXIMUM BUILDING HEIGHT
+536.00
+541.815
+517.75
+527.75
+539.00
+553.42
+563.50
+573.58
+583.66
+593.75
+603.83
+613.92
+624.33
PHASE II AB 330
AVERAGE GRADE
+539.47
91'-6 3/8" AB 330 OVERALL HEIGHT
PHASE I AB330
LOWEST GRADE
+539.00
92'-4" AB 330 OVERALL HEIGHT 0"
536.00
550.42
621.33
560.50
570.58
580.66
590.75
600.33
610.02
527.75
517.75
HIGHEST POINT
PHASE II
HIGHEST POINT
PHASE I
CENTRAL
AVENUE
ORANGE
AVENUE
+536.00
+541.815
+539.47
+539.00
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
4 08/08/25 Stage II Update
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 8/8/2025 11:20:39 PM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
08/08/2025
A4.0
BUILDING
SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.0
Section 2 2
SCALE: 1/16" = 1'-0" A4.0
Section 1 1 no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
34 22 21 20 19 18 23 24 25 26 27 28 29 30 31 32 35 33
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 11'-3" 10'-0"
TYPE III TYPE I
74'-11"
RESIDENTIAL RESIDENTIAL
PARKING
PARKING
PARKING
COURTYARD
PASEO
SIDEWALK
CALIFORNIA STREET
AMENITY COURTYARD
RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL
VEHICULAR
DRIVE
PARKING
PARKING
PRIVATE STORAGE
PRIVATE STORAGE
PARKING
PARKING
AMENITY
AMENITY AMENITY
FILL
11 SY
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
34 22 21 20 19 18 23 24 25 26 27 28 29 30 31 32
PHASE II LOWEST
FD GRADE
0"
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 8'-3" 10'-0"
TYPE III TYPE I
74'-11"
BUILDING
BEYOND
RESIDENTIAL RESIDENTIAL
PARKING
PARKING
PARKING
COURTYARD
AMENITY SIDEWALK
CALIFORNIA STREET
PASEO
PASS-THROUGH
AMENITY
AMENITY
AMENITY
RESIDENTIAL RESIDENTIAL
RAMP
RAMP
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:38:38 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.1
BUILDING
SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.1
Section 3 1
SCALE: 1/16" = 1'-0" A4.1
Section 4 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
SIDEWALK
PARKING
PARKING
ORANGE AVENUE
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
10'-1" 14'-5" 11'-3" 10'-0"
Lobby
9'-6"
2BD
2BD
COR.
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
PARKING
PARKING
POOL
PARKING
SIDEWALK
L/W
BEYOND
POOL DECK
ORANGE AVENUE
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
10'-1" 14'-5" 11'-3" 10'-0"
2'-0"
6'-0" 8'-5"
POOL EQUIPMENT
SPA
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
PARKING
PARKING
PLAZA PASEO VEHICULAR DRIVE
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
10'-1" 14'-5" 11'-3" 10'-0"
1'-6"
3BD
7'-9"
Dog Spa
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
PARKING
PARKING
PLAZA PASEO VEHICULAR DRIVE
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
10'-1" 14'-5" 11'-3" 10'-0"
1'-0"
LW
COR.
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
PARKING
PARKING
ORANGE AVENUE PLAZA
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
10'-1" 14'-5" 11'-3" 10'-0"
Lobby
2BD
PLANTING DEPTH
2% SLOPE
Fitness
1 A4.1
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
10'-1" 14'-5" 8'-3" 10'-0"
PLAZA PASEO
PARKING
PARKING
PHASE II LOWEST
FD GRADE
0"
-
---
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:38:52 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.2
BUILDING
SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A4.2
Section E 5
SCALE: 1/8" = 1'-0" A4.2
Section F 6
SCALE: 1/8" = 1'-0" A4.2
Section A 1
SCALE: 1/8" = 1'-0" A4.2
Section B 2
SCALE: 1/8" = 1'-0" A4.2
Section D 4
SCALE: 1/8" = 1'-0" A4.2
Section C 3
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
PARKING
PARKING
SIDEWALK
CALIFORNIA STREET
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
10'-1" 14'-5" 11'-3" 10'-0"
8'-0"
COR.
COR.
PLANTING
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
10'-1" 10'-0"
PARKING
PARKING
1BD
ST
SIDEWALK
CALIFORNIA STREET
7'-11"
18'-0"
COR.
COR.
PHASE II LOWEST
FD GRADE
0"
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
CENTRAL AVENUE
PARKING
PARKING
POOL DECK
6'-0" 8'-5" 8'-3" 10'-0"
1BD
9'-5"
COR.
POOL
PHASE II LOWEST
FD GRADE
0"
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL P1
-8'-3"
LEVEL P2
-18'-3"
LW
1BD
10'-1" 14'-5" 8'-3" 10'-0"
SIDEWALK
CENTRAL AVENUE
PARKING
PARKING
PARKING
PARKING
11'-2"
COR.
PHASE II LOWEST
FD GRADE
0"
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:39:04 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.3
BUILDING
SECTIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/8" = 1'-0" A4.3
Section J 3
SCALE: 1/8" = 1'-0" A4.3
Section K 4
SCALE: 1/8" = 1'-0" A4.3
Section G 1
SCALE: 1/8" = 1'-0" A4.3
Section H 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
1 A4.0
PHASE II LOWEST
FD GRADE
0"
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 95'-0" MAX BUILDING HEIGHT
74'-11"
4 1a 1c 1b
1b 5
1b
4 6
7 2b
1c
7 CALIFORNIA STREET
PASEO
1 A3.7
2 A3.7
9 LEVEL 1
0"
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
PHASE II LOWEST
FD GRADE
0"
1 A4.1
2 A4.1
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
9 1b 1a 1b
4 5
5 1a 1a
3 1a
ORANGE AVENUE
CENTRAL AVENUE
5 4 4
GARAGE ENTRY
1 A3.8
2 A3.8
MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:39:19 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.4
EXTERIOR
ELEVATIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.4
Elevation 1 - Central 1
SCALE: 1/16" = 1'-0" A4.4
Elevation 2 - Paseo 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PHASE I
LOWEST FD GRADE
3'-0"
1 A4.0
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
1a
4 1b 1c 6
4 7 5 7 7
1b 1a 1b
CALIFORNIA STREET
PASEO
1 A3.9
2 A3.9
9 LEVEL 1
0"
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
PHASE II LOWEST
FD GRADE
0"
1 A4.1
2 A4.1
14'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-5" 95'-0" MAX BUILDING HEIGHT
74'-11"
14'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
1a
1b 3 2 7
6 1a
3 1b
1a 6 6
3 4 3 3
1b
2 6 1a
CENTRAL AVENUE
ORANGE AVENUE GARAGE ENTRY
1 A3.6
2 A3.6
MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:39:35 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.5
EXTERIOR
ELEVATIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.5
Elevation 3 - Orange 1
SCALE: 1/16" = 1'-0" A4.5
Elevation 4 - California 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PHASE I
LOWEST FD GRADE
3'-0"
1 A4.0
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
1b 1a
4 6 1a
2 3
1a 1b 1a
CALIFORNIA STREET
PASEO GARAGE ENTRY
GARAGE ENTRY
1b
9 5
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
1 A4.0
PHASE II LOWEST
FD GRADE
0"
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
1a
3 1a 1c 1a 1b 1b 6
3 PASEO
CALIFORNIA STREET GARAGE ENTRY
GARAGE ENTRY
8 5
MATERIAL LEGEND
1a PLASTER - WHITE
1b PLASTER - LIGHT GRAY
1c PLASTER - DARK GRAY
2 TRESPA SIDING
3 CAST IN PLACE CONCRETE
4 THIN BRICK
5 RMP METAL PANEL
6 HARDIE PLANK
7 CONCRETE TILE
8 PERFORATED METAL PANEL
9 COMPOSITE METAL PANEL
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:39:48 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.6
EXTERIOR
ELEVATIONS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.6
Elevation 5-Phase 1 - West 1
SCALE: 1/16" = 1'-0" A4.6
Elevation 6 - Phase 2 - East 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL 1
0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
1 A4.0
PHASE II LOWEST
FD GRADE
0"
1 A3.7
2 A3.7
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 95'-0" MAX BUILDING HEIGHT
74'-11"
3 2 4
CALIFORNIA STREET
PASEO
1 LEVEL 1
0"
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
PHASE II LOWEST
FD GRADE
0"
1 A4.1
2 A4.1
1 A3.8
2 A3.8
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
5 3
ORANGE AVENUE
CENTRAL AVENUE GARAGE ENTRY
4 LIGHTING LEGEND
1 CONCEALED COVE LIGHT
2 LINEAR LED STRIP LIGHT
3 SCONCE LIGHT
4 RECESSED DOWNLIGHT
5 WALL MOUNTED UPLIGHT
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:40:00 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.7
EXTERIOR
ELEVATIONS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.7
Elevation 1 - Central Night 1
SCALE: 1/16" = 1'-0" A4.7
Elevation 2 - Paseo Night 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
PHASE I
LOWEST FD GRADE
3'-0"
1 A4.0
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
1 A3.9
2 A3.9
10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
1 5
CALIFORNIA STREET
PASEO
4 3
LEVEL 1
0"
PHASE I
LOWEST FD GRADE
3'-0"
LEVEL 2
14'-5"
LEVEL 3
24'-6"
LEVEL 4
34'-7"
LEVEL 5
44'-8"
LEVEL 6
54'-9"
LEVEL 7
64'-10"
LEVEL 8
74'-11"
ROOF
85'-4"
LEVEL 1 EAST
3'-0"
LEVEL 2 EAST
17'-5"
LEVEL 3 EAST
27'-6"
LEVEL 4 EAST
37'-7"
LEVEL 5 EAST
47'-8"
LEVEL 6 EAST
57'-9"
LEVEL 7 EAST
67'-10"
LEVEL 8 EAST
77'-11"
ROOF EAST
88'-4"
PHASE II LOWEST
FD GRADE
0"
1 A4.1
2 A4.1
1 A3.6
2 A3.6
14'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-5" 95'-0" MAX BUILDING HEIGHT
74'-11"
14'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-5" 74'-11"
95'-0" MAX BUILDING HEIGHT
4 3
5 CENTRAL AVENUE
ORANGE AVENUE GARAGE ENTRY
2 1
2 LIGHTING LEGEND
1 CONCEALED COVE LIGHT
2 LINEAR LED STRIP LIGHT
3 SCONCE LIGHT
4 RECESSED DOWNLIGHT
5 WALL MOUNTED UPLIGHT
0 10' 20' 40'
0 10' 20' 40' SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
SCALE: 1" = 50'
FOR 11" x 17" DOCUMENT
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:40:11 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A4.8
EXTERIOR
ELEVATIONS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1/16" = 1'-0" A4.8
Elevation 3 - Orange Night 1
SCALE: 1/16" = 1'-0" A4.8
Elevation 4 - California Night 2
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:40:23 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A5.0
SITE CONTEXT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:40:35 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A5.1
SITE CONTEXT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:40:46 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A5.2
SITE CONTEXT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:40:57 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A5.3
SITE CONTEXT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:41:09 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A6.0
CONCEPT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:41:22 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A6.2
CONCEPT /
IMAGERY
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:41:33 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.0
PROJECT VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Main Entry Plaza | California Ave. and Orange St.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:41:43 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.1
PROJECT VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
West Plaza | Central Ave. and California Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:41:54 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.2
PROJECT VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Orange St. and California Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:42:05 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.3
PROJECT VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
California Ave. and N Central Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:42:16 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.4
PROJECT VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
N Central Ave and Mid-Block Paseo
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:42:28 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.5
PROJECT VIEWS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Mid-Block Paseo and Orange St.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:42:39 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.6
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Main Entry Plaza | California Ave. and Orange St.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:42:50 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.7
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Orange St. and California Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:43:01 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.8
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Retail Along California Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:43:12 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.9
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
California Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:43:23 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.10
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
California Ave. and N Central Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:43:34 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.11
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Walk-Up Units Below Pool Court | N Central Ave.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:43:45 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.12
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
N Central Ave and Mid-Block Paseo
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:43:55 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.13
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Mid-Block Paseo
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:44:06 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.14
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Mid-Block Paseo
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:44:16 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.15
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Mid-Block Paseo and Orange St.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:44:26 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.16
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Live-Work Units | Orange St.
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:44:37 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A7.17
PROJECT VIEWS -
LIGHTING DESIGN
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
Orange St. Below Pool Courtyard
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:44:49 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A8.0
SECTION DETAILS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 1-1 1
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 1-3 2
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 1-4 3
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 2-1 4
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 2-2 5
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 2-4 6
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 3-1 7
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 3-2 8
SCALE: 1 1/2" = 1'-0" A8.0
DETAIL 4-1 9
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:45:02 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A8.1
SECTION DETAILS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 3" = 1'-0" A8.1
DETAIL 4-1.5 1
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 4-2 2
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 5-1 3
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 5-2 4
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 6-3 5
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 7-1 6
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 7-2 7
SCALE: 1 1/2" = 1'-0" A8.1
DETAIL 7-3 8
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:45:14 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A8.2
SECTION DETAILS
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
SCALE: 1 1/2" = 1'-0" A8.2
DETAIL 7-4 1
SCALE: 1 1/2" = 1'-0" A8.2
DETAIL 8-2 2
SCALE: 3" = 1'-0" A8.2
DETAIL 9-1 3
SCALE: 3" = 1'-0" A8.2
DETAIL 9-2 4
SCALE: 1" = 1'-0" A8.2
DETAIL 9-3 5
SCALE: 1 1/2" = 1'-0" A8.2
DETAIL 9-4 6
SCALE: 3" = 1'-0" A8.2
DETAIL 9-5 7
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 7/22/2024 4:45:28 PM
J. Grant
D. Waite
A. Mankar
2107028
Stage II Submittal
A9.0
GROSS SITE AREA
EXHIBIT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
Central Avenue
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
LEVEL 1 PHASE I
LOWEST FIRE
DEPARTMENT GRADE
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
ROOF
LEVEL P1 LEVEL P1
LEVEL P2 LEVEL P2
4 5 6 7 8 9 10 11 12 13 14 15 17 16
74'-11" LAST OCCUPPIED FLOOR [NON-HIGHRISE]
9'-8" 10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" LEVEL 1 EAST
LEVEL 2 EAST
LEVEL 3 EAST
LEVEL 4 EAST
LEVEL 5 EAST
LEVEL 6 EAST
LEVEL 7 EAST
LEVEL 8 EAST
ROOF EAST
7'-0" 10'-5" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 10'-1" 14'-5" 11'-3" 10'-0"
PHASE II LOWEST
FIRE DEPARTMENT
GRADE
38 AMENITY
RESIDENTIAL
BUILDING RESIDENTIAL RESIDENTIAL
BEYOND
RESIDENTIAL RESIDENTIAL
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
COURTYARD
PODIUM COURTYARD
TRANSITION
BUILDING
BEYOND
SIDEWALK
SIDEWALK
CENTRAL
AVENUE
ORANGE
AVENUE
PHASE II PHASE I PHASE LINE
15% RAMP
15% RAMP
3'-0"
BUILDING
BEYOND
PRIVATE STORAGE
PRIVATE STORAGE
74'-11" LAST OCCUPIED FLOOR [NON-HIGHRISE]
TYPE III TYPE I
95'-0" MAX BUILDING HEIGHT
TYPE III TYPE I
9' - 1"
7'-0"
95'-0" MAXIMUM BUILDING HEIGHT
+536.00
+541.815
+517.75
+527.75
+539.00
+553.42
+563.50
+573.58
+583.66
+593.75
+603.83
+613.92
+624.33
PHASE II AB 330
AVERAGE GRADE
+539.47
91'-6 3/8" AB 330 OVERALL HEIGHT
PHASE I AB330
LOWEST GRADE
+539.00
92'-4" AB 330 OVERALL HEIGHT 0"
536.00
550.42
621.33
560.50
570.58
580.66
590.75
600.33
610.02
527.75
517.75
HIGHEST POINT
PHASE II
HIGHEST POINT
PHASE I
CENTRAL
AVENUE
ORANGE
AVENUE
+536.00
+541.815
+539.47
+539.00
no. date revision
revisions
consultant
project director
project designer
project architect
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
4 08/08/25 Stage II Update
Autodesk Docs://2107028 236 N Central Ave (Sears Site)/236 N Central Ave_R22.rvt 8/8/2025 11:20:18 PM
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
08/08/2025
A9.1
BUILDING HEIGHT
EXHIBIT
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
236 North
TC +538.03 Central Avenue
PHASE I
LOWEST GRADE
TC +545.60
PHASE I
HIGHEST GRADE
TC +535.50
PHASE II
LOWEST GRADE
TC +543.44
PHASE II
HIGHEST GRADE
PHASE II
AVERAGE GRADE
+539.47
PHASE I
AVERAGE GRADE
+541.815
PHASE I
AVERAGE GRADE +541.815
HIGHEST POINT OF BUILDING +631.33
OVERALL HEIGHT PER AB 330 +89.515
PHASE II
AVERAGE GRADE +539.47
HIGHEST POINT OF BUILDING +630.99
OVERALL HEIGHT PER AB 330 +91.52
REFER TO GRADING PLAN OVERALL SITE SHEET C 3.00
SCALE: 1/16" = 1'-0" A9.1
Building Height 1
no. date revision
revisions
project director
project designer
project architect
project number
client / project
project status
1 08/09/22 Stage I Preliminary Design
2 04/19/23 Stage I Redesign
3 12/20/23 Stage II Submission
12/20/23
D. Gonzalez
J. Grant
A. Mankar
2107028
Stage II Submittal
6/13/2025
5 06/13/25 Stage II Update
4 07/23/24 Stage II Update - Lighting Design
Stage II Submittal
08/08/2025 6 08/08/25 Stage II Update
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
LW
LW
1BD 1BD LW
LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF Virtual Golf
2013 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
35 35
PLAZA
PLAZA
PLAZA PLAZA PASEO PASEO
+541.0 +540.0
+539.0
+538.0
+537.0
+536.0
+540.0
+541.0
+544.5
+537.5
+537.5
+538.0
1BD
1656 SF Lobby
LW LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF Lobby
LW
LW
LW
1115 SF 2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
ABOVE
POOL
ABOVE
POOL
LEVEL 1 PARKING
120 SPACES (17 IN-UNIT)
PHASE 2
PHASE 1
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
LOADING
LOADING
DN TO
LEVEL P1
GARAGE
PRIVATE
Entry
2464 SF Fitness
1575 SF
Flex Space /
Business
Lounge
Room
Game
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF Dog Spa
DN TO
LEVEL P1
15%
15%
38 38
211 SF Mens
244 SF Womens
400 SF Mail
136 SF
IT/AV 243 SF Break Room
288 SF Work Room
236 SF Office
279 SF Office
Lobby
202 SF FC
220 SF FC
400 SF Mail
+539
+539
+544.5
+539
+539.0
+536.0
+541.0
2.5%
6.4%
+539
+539 GATE GATE
VAN
VAN
446 SF Speak Easy
ORANGE ST. CALIFORNIA AVENUE
CENTRAL AVENUE SALEM ST. 16.00'
31.47' 2.0% 1.8%
1.0% 1.7%
1.6%
2.0%
0.8% 1.9%
0.1%
1.0% 545.50 FS 546.51 FS 547.27 FS 546.99 FS 548.70 FS 548.43 FS 548.24 FS548.83 FS 548.51 FS 548.26 FS 548.55 FS 547.55 FS 547.52 FS 546.51 FS 548.11 FS 547.18 FS 546.32 FS 546.06 FS 545.20 FS 548.50 FS 549.24 FS 549.40 FS 548.51 FS 548.05 FS
1.6%0.6% 1.4%
1.3% 1.9%2.0%
1.2% 2.0%
1.6%
1.1%
2.0%1.2% 1.3%
1.5%
1.7% 1.2%
1.6% 1.8%
2.2%
2.2% 1.2% 545.08 FS 544.23 FS 544.81 FS 543.15 FS 542.48 FS 542.12 FS 541.95 FS 540.64 FS 541.23 FS540.23 FS 540.00 FS 539.98 FS 539.65 FS539.40 FS 538.98 FS 539.28 FS 538.98 FS 538.75 FS 539.00 FS 538.34 FS 538.02 FS538.23 FS 538.48 FS 538.48 FS 538.50 FS 538.11 FS 537.98 FS 537.48 FS537.35 FS 536.75 FS536.65 536.69 FS FS 537.04 FS537.39 FS 537.65 FS 537.98 FS 538.23 FS 538.64 FS 538.87 FS 539.19 FS539.39 FS 540.65 FS 540.65 FS 541.00 FS 541.64 FS 541.22 FS 543.64 FS543.64 FS 543.83 FS 543.83 FS 538.98 FS 538.89 FS 538.79 FS 538.21 FS 543.35 FS 543.47 FS 543.55 FS 543.86 FS 543.85 FS 543.94 FS no. date revision revisions consultant project director project designer project architect project number architect client / project project status plot date sheet number sheet name stamp D. Martin D. Martin 1MGM010300 Entitlement 7/22/2022 MGP XII Glendale Central, LLC 236 N. Central Ave Glendale, CA 91203 236 N. Central Ave (Sears Site) 27220 TURNBERRY LANE, SUITE 190 VALENCIA, CA 91355 661.219.60007/22/2022 1:08 PM Ben McIntyre C3.00 GRADING PLAN OVERALL SITE POTENTIAL FUTURE PARK 12/29/23 project status 12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign3 12/20/23 Stage II Submission 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update Stage II Su 6/13/2025 4 5
6 7
8 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
33 33 34 35
PLAZA
PLAZAPASEO
+541.0 +540.0
+539.0
+538.0
+537.5 10'-0" 10'-0" 10'-0"
2812 SF Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF Lobby
LW
LW
LW
1115 SF 2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD Utility
ABOVE
POOL
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 2
PHASE 1
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
20'-0"
LOADING
DN TO
LEVEL P1
GARAGE
PRIVATE
Entry
2300 SF Fitness
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF Dog Spa
15%
38 38
211 SF Mens
244 SF Womens
400 SF Parcel
92 SF
IT/AV
275 SF Break Room
288 SF Work Room
200 SF Office
200 SF Office
220 SF FC
+539
+544
+539
+539.0
2.5%
6.4%
+539 10'-0" 10'-0" 10'-0" 4'-3" GATE GATE
VAN
VAN
584 SF Speak Easy
+539 +543
+543
+544.5
Mail
255 SF Cold Storage
PHASE 1
ORANGE ST. CALIFORNIA AVENUE
CENTRAL AVENUE SALEM ST. 16.00'
16.12' 29.50'
31.47' 545.75 FS545.15 FS 543.15 FS 542.48 FS541.00 FS 540.65 FS 540.23 FS 540.00 FS 539.98 FS 539.98 FS539.69 FS539.65 FS 539.29 FS 539.40 FS 538.48 FS 538.02 FS538.02 FS 538.34 FS 538.46 FS 538.98 FS 538.98 FS 538.97 FS 537.41 FS 538.84 FS
1.3%
1.0% 0.6% 544.17 FS 544.23 FS 544.81 FS 545.68 FS
1.6%
1.4%
1.6% 1.7% 538.43 FS 547.19 FS 548.50 FS549.40 FS 548.70 FS 548.11 FS 547.64 FS
1.8% 547.20 FS 1.9% 0.6%
0.8%
1.5% 1.7%
2.0%
0.9% 1.7% 546.45 FS 547.27 FS 545.50 FS 546.06 FS 546.20 FS 546.66 FS 548.26 FS 548.05 FS 538.48 FS 544.93 FS544.72 FS GATE no. date revision revisions consultant project director project designer project architect project number architect client / project project status plot date sheet number sheet name stamp D. Martin D. Martin 1MGM010300 Entitlement 7/22/2022 MGP XII Glendale Central, LLC 236 N. Central Ave Glendale, CA 91203 236 N. Central Ave (Sears Site) 27220 TURNBERRY LANE, SUITE 190 VALENCIA, CA 91355 661.219.60008/3/2022 4:31 PM Ben McIntyre C3.10 GRADING PLAN - PHASE 1 POTENTIAL FUTURE PARK 12/29/23 project status 12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign3 12/20/23 Stage II Submission 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update Stage II Su 6/13/2025 4 4 5 5 6 6 7 7 8 8 9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
LW
LW
1BD 1BD LW
LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF Virtual Golf
2013 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
35 35
PLAZA
PLAZA
PLAZA PLAZA PASEO PASEO
+541.0 +540.0
+539.0
+538.0
+537.0
+536.0
+540.0
+541.0
+544.5
+537.5
+537.5
+538.0
1BD
1656 SF Lobby
LW LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF Lobby
LW
LW
LW
1115 SF 2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
ABOVE
POOL
ABOVE
POOL
LEVEL 1 PARKING
120 SPACES (17 IN-UNIT)
PHASE 2
PHASE 1
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
LOADING
LOADING
DN TO
LEVEL P1
GARAGE
PRIVATE
Entry
2464 SF Fitness
1575 SF
Flex Space /
Business
Lounge
Room
Game
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF Dog Spa
DN TO
LEVEL P1
15%
15%
38 38
211 SF Mens
244 SF Womens
400 SF Mail
136 SF
IT/AV 243 SF Break Room
288 SF Work Room
236 SF Office
279 SF Office
Lobby
202 SF FC
220 SF FC
400 SF Mail
+539
+539
+544.5
+539
+539.0
+536.0
+541.0
2.5%
6.4%
+539
+539 GATE GATE
VAN
VAN
446 SF Speak Easy
ORANGE ST. CALIFORNIA AVENUE
CENTRAL AVENUE SALEM ST. 16.00' 2.0% 1.8%
1.0% 1.7%
1.6%
2.0%
0.8% 1.9%
1.0% 12 3 4 12 3 4 2 2 3 4 12 34 no. date revision revisions consultant project director project designer project architect project number architect client / project project status plot date sheet number sheet name stamp D. Martin D. Martin 1MGM010300 Entitlement 7/22/2022 MGP XII Glendale Central, LLC 236 N. Central Ave Glendale, CA 91203 236 N. Central Ave (Sears Site) 27220 TURNBERRY LANE, SUITE 190 VALENCIA, CA 91355 661.219.60007/21/2022 7:34 PM Leah Isidro C4.00 STORM DRAIN & LID STORM DRAIN DRY WELL CURB DRAIN INLET CURB DRAIN (CURB-O-LET) LEGEND NOTES PROPOSED DRY WELL BELOW BASEMENT LEVEL OVERFLOW PRESSURE PIPE TO INLET STRUCTURE AT PODIUM LEVEL CURB DRAIN INLET STRUCTURE CURB DRAIN (CURB-O-LET) TO DISCHARGE OVERLOW TO STREET GUTTER 1234 BASEMENT SIDEWALK TYPICAL LID SYSTEM SECTION CLEANOUT LID TORRENT DRY WELL UNIT REFER TO MANUFACTURER'S DETAIL VAPOR BARRIER GROUND LEVEL BASEMENT FF PER PLAN
OVERFLOW/SETTLEMENT
CHAMBER
18' EL.
INFILTRATION ZONE
(PER GEOTECH RECOMMENDATION) EL.
TOTAL DEPTH = TBDIMPERVIOUS BACKFILL
UNIT DRY WELL DEPTH = TBD CURB-O-LET CURB DRAIN INLET AT PODIUM/GROUND LEVEL TC PER PLAN OUTLET INVERT @ 12" ABOVE GUTTER FLOW LINE R/W PRESSURE PIPE TO DISCHARGE TO CURB DRAIN INLET AT PODIUM LEVEL PODIUM/GROUND FLOOR PRESSURE LID ROADWAY POTENTIAL FUTURE PARK 12/29/23 project status 12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign 3 12/20/23 Stage II Submission 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update Stage II Su 6/13/2025 4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
LW
LW
1BD 1BD LWLW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF Virtual Golf
2013 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
35 35
PLAZA
PLAZA
PLAZA PLAZA PASEO PASEO
+541.0 +540.0
+539.0
+538.0
+537.0
+536.0
+540.0
+541.0
+544.5
+537.5
+537.5
+538.0
1BD
1656 SF Lobby
LW LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF Lobby
LW
LW
LW
1115 SF 2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
ABOVE
POOL
ABOVE
POOL
LEVEL 1 PARKING
120 SPACES (17 IN-UNIT)
PHASE 2
PHASE 1
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
LOADING
LOADING
DN TO
LEVEL P1
GARAGE
PRIVATE
Entry
2464 SF Fitness
1575 SF
Flex Space /
Business
Lounge
Room
Game
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF Dog Spa
DN TO
LEVEL P1
15%
15%
38 38
211 SF Mens
244 SF Womens
400 SF Mail
136 SF
IT/AV 243 SF Break Room
288 SF Work Room
236 SF Office
279 SF Office
Lobby
202 SF FC
220 SF FC
400 SF Mail
+539
+539
+544.5
+539
+539.0
+536.0
+541.0
2.5%
6.4%
+539
+539 GATE GATE
VAN
VAN
446 SF Speak Easy
ORANGE ST. CALIFORNIA AVENUE
CENTRAL AVENUE SALEM ST. 2.0% REUSE EXISTING 3/4" WATER METER FOR PARK REUSE EXISTING 3/4" WATER METER FOR PARK ADD NEW 8" DOMESTIC WATER PHASE 1 REUSE EXISTING 8" WATER - FIRE WATER PHASE 1 REUSE EXISTING 3/4" WATER FOR IRRIGATION PHASE 1 REMOVE EXISTING SEWER AND VACATE ALLEY SANITARY SEWER CONNECTION PHASE 1 NEW MANHOLE SERVING AS HEAD OF EXISTING SEWER REUSE EXISTING 8" WATER - FIRE WATER PHASE 2 INSTALL NEW FIRE HYDRANT ADD NEW 1" IRRIGATION WATER PHASE 2 REUSE EXISTING 8" WATER FOR DOMESTIC WATER - PHASE 2 INSTALL NEW FIRE HYDRANT no. date revision revisions consultant project director project designer project architect project number architect client / project project status plot date sheet number sheet name stamp D. Martin D. Martin 1MGM010300 Entitlement 7/22/2022 MGP XII Glendale Central, LLC 236 N. Central Ave Glendale, CA 91203 236 N. Central Ave (Sears Site) 27220 TURNBERRY LANE, SUITE 190 VALENCIA, CA 91355 661.219.60007/22/2022 5:02 PM Ben McIntyre C5.00 UTILITY PLAN LEGEND WATER LINE FIRE WATER LINE IRRIGATION LINE SANITARY SEWER SS MANHOLE GATE VALVE FIRE HYDRANT EXISTING FIRE HYDRANT FIRE SERVICE BACKFLOW ASSEMBLY WATER METER BACKFLOW ASSEMBLY REDUCED PRESSURE PRINCIPLE ASSEMBLY SEWER CONSTRUCTION NOTES CONSTRUCT HOUSE CONNECTION PER SPPWC STD PLAN 222-2. VERIFY INVERT, SIZE AND LOCATION OF EXISTING 8" SEWER PRIOR TO COMMENCEMENT OF WORK CONSTRUCT PVC SDR 35, SIZE AND GRADE PER PLAN CONSTRUCT PRECAST CONCRETE SEWER MANHOLE PER SPPWC STD PLAN 200-4 WITH MANHOLE FRAME AND COVER PER SPPWC STD PLAN 210-4 CONSTRUCT CLEANOUT PER DETAIL 4 ON SHEET C600 POINT OF CONNECTION, SEE PLUMBING PLANS FOR CONTINUATION INSTALL 5,000 GALLON GREASE INTERCEPTOR, SEE MEP PLANS FOR ADDITIONAL INFORMATION 404142434445 WATER CONSTRUCTION NOTES CONSTRUCT WATER SUPPLY CONNECTION TO EXISTING PRIVATE MAIN. VERIFY EXISTING LINE SIZE, DEPTH, AND CONDITION PRIOR TO COMMENCING WORK CONSTRUCT FIRE WATER LINE, C900 PVC CLASS 200, SIZE PER PLAN. PIPE TRENCH PER LOS ANGELES COUNTY WATERWORKS DISTRICTS STD PLAN W-46, SEE SHEET C610 CONSTRUCT DOMESTIC WATER LINE C900 PVC CLASS 200, SIZE PER PLAN. CONSTRUCT THRUST BLOCK CONSTRUCT FIRE HYDRANT ASSEMBLY CONSTRUCT BACK FLOW ASSEMBLY BUILDING POINT OF CONNECTION, SEE PLUMBING PLANS FOR CONTINUATION CONSTRUCT DOMESTIC WATER METER PER LOS ANGELES COUNTY WATERWORKS SPECIFICATIONS CONSTRUCT DOMESTIC WATER BACK FLOW ASSEMBLY CONSTRUCT IRRIGATION METER CONSTRUCT 1.5" REDUCED PRESSURE PRINCIPLE ASSEMBLY WILKINS MODEL 975XL OR APPROVED SIMILAR CONSTRUCT 1.5" IRRIGATION LATERAL IRRIGATION LATERAL CONNECTION. REFER TO LANDSCAPE PLANS FOR CONTINUATION 50515253545556575859606162 PIPE CROSSING NOTES MAINTAIN 1.0' CLEARANCE BETWEEN UTILITIES. WATER TO CROSS ABOVE SEWER. GAS SERVICE TO CROSS ABOVE THE OTHER UTILITY. MAINTAIN 1.0' CLEARANCE BETWEEN UTILITIES. SEWER PIPE TO CROSS UNDER THE OTHER UTILITY PER SPPWC STD PLAN 222-2, PROFILE TYPE D.
AB
WBFP RPPA POTENTIAL FUTURE PARK 12/29/23 project status 12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 1 08/09/22 Stage I Preliminary Design 2 04/19/23 Stage I Redesign3 12/20/23 Stage II Submission 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update Stage II Su 6/13/2025 no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
Narrative Inspiration - Art Deco
Grand Central Airport
Jazz Moderne
Sears Building
Classical Moderne
College of Beauty
Streamline Moderne
Masonic Lodge
Classical Moderne
Seeley’s
Streamline Moderne
Adam’s Square Gas Station
Streamline Moderne
Adam’s Square
Jazz Moderne
City Hall
Classical Moderne
Project Site
The diagram above highlights the unique collection of
Art Deco era architectural treasures throughout Glendale’s city limits. Art Deco buildings began to appear in Glendale during the late 1920s during a period of considerable business expansion caused by the population growth. Art Deco as an architectural style is an umbrella term and encompasses several different variations, but
can be generally categorized in three categories: Jazz
Moderne, Classical Moderne and Streamline Moderne.
We intend to celebrate these styles in the landscape as a simple nod to what historically was once here.
Alex Theater
Jazz Moderne
Professional Building
Classical Moderne
NARRATIVE
INSPIRATION
0.00 12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
The Jazz Moderne patterns were inspired
by fine craftsmanship and rich materials. It
represented luxury, glamour, exuberance,
and faith in social and technological
progress. Patterns were designed with
elaborate motifs inspired by organic forms
such as leaves, ferns, flowers, and birds
mixed with geometric patterns.
The Classical Moderne patterns represent
balanced and symmetrical forms. The
Post-Depression style was a simplified
version of Jazz Moderne and utilized
repetitive, simplified patterns in monumental
ways to evoke a feeling of superiority.
Jazz Moderne Classical Moderne
Jazz Moderne
Classical Moderne
INSPIRATION TRANSLATION
To Alex Theatre
Art Deco Styles
CALIFORNIA AVE
ORANGE ST
CENTRAL AVE
0.10 NARRATIVE
INSPIRATION
POTENTIAL
FUTURE PARK
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal TS
POOL
SPA
SPA
Legend
Art Deco Plaza
Large Specimen Tree, Seating Terrace, Arc Deco Paving,
Outdoor Fitness, Outdoor Game Room
Potential Future Park
Elevated Lawn Platform, Wood Deck, Allée of Trees, Seating Variety, Flexible Event Space, Temporary Vendor Tents
The Lookout
Pool & Spa, Outdoor Lounge, Fire Table, Cabanas, Day
Beds, Contemplative Spaces, Feature Wall
The Gathering
Dining Tables, Flexible Turf Area, Lounge and Dining,
Ping Pong Table
The Paseo
Seating Variety, Creative Workspace, Dog Relief Area,
Vertical Screen, Overhead Structure
The Deck
Seating Variety, Contemplative Space, Yoga,
Lounge and Dining
CALIFORNIA AVE
ORANGE ST
CENTRAL AVE
0 10 20 40
Scale: 1” = 20’-0” 0.20
LANDSCAPE
PROGRAM
DIAGRAM
FRONT
PORCH
OUTDOOR
BUSINESS
LOUNGE
OUTDOOR
GAME ROOM
TRANSPORTATION
HUB
POTENTIAL
FUTURE PARK
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
TS
POOL
SPA
SPA
TS
POOL
SPA
SPA
The Paseo • Seating, Creative Workspace • Dog Relief Area • Garden • Vertical Screen • Overhead Structure Art Deco Plaza • Large Specimen Tree • Seating Terrace • Art Deco Paving • Outdoor Fitness • Outdoor Game Room • Potential Future
Park • Elevated Lawn Platform • Wood Deck • Allée of Trees • Seating Variety • Flexible Event Space • Temporary Vendor Tents TS
POOL
SPA
SPA
0.30 CONCEPT
IMAGERY
CONCEPTS FOR PARK DESIGN TO BE COMPLETED BY OTHERS - NOT PART OF THIS PROJECT 12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
TS
POOL
SPA
SPA
TS
POOL
SPA
SPA
The Gathering • Raise Planters • Dining Tables • Flexible Turf Area • Lounge and Dining • Ping Pong Table The Deck • Seating Variety • Contemplative Space • Yoga • Lounge and Dining The Lookout • Pool & Spa • Outdoor Lounge • Fire Table • Cabanas • Day Beds • Contemplative Spaces • Feature Wall TS
POOL
SPA
SPA
0.40 CONCEPT
IMAGERY
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
CALIFORNIA AVE
ORANGE ST
CENTRAL AVE
0 10 20 40
Scale: 1” = 20’-0” 0.50
ILLUSTRATIVE
LANDSCAPE
PLAN
POTENTIAL
FUTURE PARK
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
CALIFORNIA AVE
ORANGE ST
CENTRAL AVE
Paseos
Courtyards & Plazas
Potential Future Park
Courtyards & Plazas
Potential Future Park
Paseos
Required Landscaping
Percentage
Minimum 25%
-
Required Landscaping
Percentage
Minimum 25%
Proposed
28%
Proposed Landscaping
Percentage
42%
Proposed
31%
Required Trees
1 Tree Per 600 SQFT
-
Required Trees
1 Tree Per 750 SQFT
Proposed Total
Number of Trees
9 Proposed Total
Number of Trees
50 Proposed Total
Number of Trees
11 Required Raised
Planters
Maximum 25%
Required Raised
Planters
Maximum 25%
Proposed Raised
Planters
144 of 1,615 = 8.9%
Proposed Raised
Planters
396 of 2,161 = 18.3%
0 10 20 40
Scale: 1” = 20’-0” 0.60
OPEN SPACE
CALCULATIONS
POTENTIAL
FUTURE PARK
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
TS
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
TS
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
CONSTRUCTION
PLAN -
GROUND LEVEL
L1.01
SA-5 TYP.
P-2 TYP.
SA-6
W-1
SA-2A
SA-1
C-1
P-1
SA-7
SA-3
P-3A
W-1
P-3
W-1 TYP.
C-1 TYP.
TYP.
P-2
SA-7 TYP.
P-1
SA-12
SA-4
SA-4A
C-1
W-3
R-1
P-4
P-2
W-2
W-3A
TYP.
TYP.
TYP.
TYP.
TYP.
W-2
SA-6A
SA-6
C-1
P-1
SA-6
SA-9
P-1 TYP.
P-2 TYP.
SA-6 TYP.
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA PA PA PA PA PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA PA
PA PA PA PA PA
PA PA
PAVING LEGEND
ITEM DESCRIPTION DETAIL
P-1
SA-3
SITE AMENITIES LEGEND
SA-1
P-2
P-3
GRILL COUNTER A
BURNISHED BLOCK W/ (2) GRILLS
SYNTHETIC TURF
SA-2A
SA-7
SA-7B
GRILL COUNTER B
BURNISHED BLOCK W/ (1) GRILLS
FIRE TABLE - SQUARE,
PRODUCT TBD
SA-10
SA-11
CONCRETE PAVING A:
NAT. GRAY W/ TOP CAST 5
CONCRETE PAVING C:
W/ APPLIED SEALER
SA-11A
SA-5
SA-6
SA-7A
FIRE TABLE - RECTANGULAR,
PRODUCT TBD
FESTOON LIGHTING / SUPPORT POLES
DETAIL H
SHEET L1.53
S.S BIKE RACK, PRODUCT TBD
SA-4
SA-4A
SA-8
DOG WASTE RECEPTACLE,
PRODUCT TBD
SA-8A
SA-9
P-4 CONCRETE STAIR
C-1
CURB & WALL LEGEND
W-1
CONCRETE CURB - PLANTER CURB
W-2
FENCE & RAILING LEGEND
R-1 S.S HANDRAIL
F-2 POOL ENCLOSURE FENCE - GLASS
F-1 SECURITY FENCE @ 2ND FLOOR ENTRY
- GLASS
METAL PLANTER, PRODUCT TBD
C.I.P CONCRETE WALL
W-3 C.I.P CONCRETE WALL W/ WOOD TOP
W-3A C.I.P CONCRETE WALL W/ WOOD
PLATFORM
GATE LEGEND
G-1
G-2
ACCESS GATE @ 2ND FLOOR ENTRY
GLASS
POOL ENCLOSURE GATE - GLASS
OVERHEAD TRELLIS C
CUSTOM
OVERHEAD TRELLIS A
CUSTOM
OVERHEAD TRELLIS B
CUSTOM
OUTDOOR CONCRETE PING PONG
TABLE, PRODUCT TBD
WOOD BENCH ATTACHED TO STEEL
PLANTER, PRODUCT TBD
WOOD SCREEN W/ STEEL FRAME,
WOOD MATERIAL TBD
FITNESS EQUIPMENT - BALANCING BEAM
PRODUCT TBD
FITNESS EQUIPMENT - SINGLE AIR
WALKER, PRODUCT TBD
WOOD BENCH - VESTRE COAST
DETAIL O
SHEET L1.53
PER
MANUFACTURER
DETAIL E
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL A
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL M
SHEET L1.53
DETAIL H
SHEET L1.52
DETAIL G
SHEET L1.51
DETAIL F
SHEET L1.52
DETAILS E,F
SHEET L1.51
DETAIL M
SHEET L1.51
DETAILS C,D
SHEET L1.51
DETAILS A,B
SHEET L1.51
DETAIL A
SHEET L1.51
PICNIC TABLE - IN GROUND, PRODUCT
TBD SA-12
P-3A SYNTHETIC TURF
@ DOG RELIEF
DETAILS C,D
SHEET L1.51
SA-6A WOOD BENCH - L SHAPED VESTRE
P-1A CONCRETE PAVING B:
(ON STRUCTURE)
DETAIL B
SHEET L1.51
W-4 CMU BURNISHED BLOCK WALL DETAIL E
SHEET L1.51
CONCRETE SEATING CUBES, PRODUCT
TBD SA-13
W-5 FEATURE WALL CMU BLOCK
W/ PLASTER FINISH
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
P-5 CONCRETE RAMP
-
SA-2B WOOD BENCH ATTACHED TO CMU
PLANTER, WOOD MATERIAL TBD
PER
MANUFACTURER -
PER
MANUFACTURER -----
PER
MANUFACTURER
DETAIL I
SHEET L1.52
DETAIL H
SHEET L1.53
BAR HEIGHT TABLE AND STOOLS,
PRODUCT TBD SA-14 PER
MANUFACTURER
PA
PA
TYP.
P-5
1.00 ORANGE ST
CENTRAL AVE
CALIFORNIA AVE
GROUND LEVEL
CONSTRUCTION
PLAN
NOT FOR CONSTRUC12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
TS
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
TS
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
CONSTRUCTION
PLAN -
GROUND LEVEL
L1.01
SA-5 TYP.
P-2 TYP.
SA-6
W-1
SA-2A
SA-1
C-1
P-1
SA-7
SA-3
P-3A
W-1
P-3
W-1 TYP.
C-1 TYP.
TYP.
P-2
SA-7 TYP.
P-1
SA-12
SA-4
SA-4A
C-1
W-3
R-1
P-4
P-2
W-2
W-3A
TYP.
TYP.
TYP.
TYP.
TYP.
W-2
SA-6A
SA-6
C-1
P-1
SA-6
SA-9
P-1 TYP.
P-2 TYP.
SA-6 TYP.
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA PA PA PA PA PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA PA
PA PA PA PA PA
PA PA
PAVING LEGEND
ITEM DESCRIPTION DETAIL
P-1
SA-3
SITE AMENITIES LEGEND
SA-1
P-2
P-3
GRILL COUNTER A
BURNISHED BLOCK W/ (2) GRILLS
SYNTHETIC TURF
SA-2A
SA-7
SA-7B
GRILL COUNTER B
BURNISHED BLOCK W/ (1) GRILLS
FIRE TABLE - SQUARE,
PRODUCT TBD
SA-10
SA-11
CONCRETE PAVING A:
NAT. GRAY W/ TOP CAST 5
CONCRETE PAVING C:
W/ APPLIED SEALER
SA-11A
SA-5
SA-6
SA-7A
FIRE TABLE - RECTANGULAR,
PRODUCT TBD
FESTOON LIGHTING / SUPPORT POLES
DETAIL H
SHEET L1.53
S.S BIKE RACK, PRODUCT TBD
SA-4
SA-4A
SA-8
DOG WASTE RECEPTACLE,
PRODUCT TBD
SA-8A
SA-9
P-4 CONCRETE STAIR
C-1
CURB & WALL LEGEND
W-1
CONCRETE CURB - PLANTER CURB
W-2
FENCE & RAILING LEGEND
R-1 S.S HANDRAIL
F-2 POOL ENCLOSURE FENCE - GLASS
F-1 SECURITY FENCE @ 2ND FLOOR ENTRY
- GLASS
METAL PLANTER, PRODUCT TBD
C.I.P CONCRETE WALL
W-3 C.I.P CONCRETE WALL W/ WOOD TOP
W-3A C.I.P CONCRETE WALL W/ WOOD
PLATFORM
GATE LEGEND
G-1
G-2
ACCESS GATE @ 2ND FLOOR ENTRY
GLASS
POOL ENCLOSURE GATE - GLASS
OVERHEAD TRELLIS C
CUSTOM
OVERHEAD TRELLIS A
CUSTOM
OVERHEAD TRELLIS B
CUSTOM
OUTDOOR CONCRETE PING PONG
TABLE, PRODUCT TBD
WOOD BENCH ATTACHED TO STEEL
PLANTER, PRODUCT TBD
WOOD SCREEN W/ STEEL FRAME,
WOOD MATERIAL TBD
FITNESS EQUIPMENT - BALANCING BEAM
PRODUCT TBD
FITNESS EQUIPMENT - SINGLE AIR
WALKER, PRODUCT TBD
WOOD BENCH - VESTRE COAST
DETAIL O
SHEET L1.53
PER
MANUFACTURER
DETAIL E
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL A
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL M
SHEET L1.53
DETAIL H
SHEET L1.52
DETAIL G
SHEET L1.51
DETAIL F
SHEET L1.52
DETAILS E,F
SHEET L1.51
DETAIL M
SHEET L1.51
DETAILS C,D
SHEET L1.51
DETAILS A,B
SHEET L1.51
DETAIL A
SHEET L1.51
PICNIC TABLE - IN GROUND, PRODUCT
TBD SA-12
P-3A SYNTHETIC TURF
@ DOG RELIEF
DETAILS C,D
SHEET L1.51
SA-6A WOOD BENCH - L SHAPED VESTRE
P-1A CONCRETE PAVING B:
(ON STRUCTURE)
DETAIL B
SHEET L1.51
W-4 CMU BURNISHED BLOCK WALL DETAIL E
SHEET L1.51
CONCRETE SEATING CUBES, PRODUCT
TBD SA-13
W-5 FEATURE WALL CMU BLOCK
W/ PLASTER FINISH
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
P-5 CONCRETE RAMP
-
SA-2B WOOD BENCH ATTACHED TO CMU
PLANTER, WOOD MATERIAL TBD
PER
MANUFACTURER -
PER
MANUFACTURER -----
PER
MANUFACTURER
DETAIL I
SHEET L1.52
DETAIL H
SHEET L1.53
BAR HEIGHT TABLE AND STOOLS,
PRODUCT TBD SA-14 PER
MANUFACTURER
PA
PA
TYP.
P-5
1.00 ORANGE ST
CALIFORNIA AVE
GROUND LEVEL
CONSTRUCTION
PLAN
NOT FOR CONSTRUC12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
PHASE 1
PHASE 2
POOL
SPA
SPA
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
CONSTRUCTION
PLAN -
LEVEL 2
L1.02
SA-7A
SA-11A
SA-11
G-2
F-2
W-3A
SA-8
SA-11A
SA-8A
SA-1
SA-7B
SA-1
SA-8A
SA-11
SA-2B
SA-8A
W-5
G-2
G-1
F-1
P-2
P-1A
POOL
TURF
PA
PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA PA
PA PA
PA
PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA PA
PA
PA
PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
P-4
F-2
P-2
TYP. W-4
SA-2B
F-2
G-2
P-1A
TYP. W-4
SA-13
PAVING LEGEND
ITEM DESCRIPTION DETAIL
P-1
SA-3
SITE AMENITIES LEGEND
SA-1
P-2
P-3
GRILL COUNTER A
BURNISHED BLOCK W/ (2) GRILLS
SYNTHETIC TURF
SA-2A
SA-7
SA-7B
GRILL COUNTER B
BURNISHED BLOCK W/ (1) GRILLS
FIRE TABLE - SQUARE,
PRODUCT TBD
SA-10
SA-11
CONCRETE PAVING A:
NAT. GRAY W/ TOP CAST 5
CONCRETE PAVING C:
W/ APPLIED SEALER
SA-11A
SA-5
SA-6
SA-7A
FIRE TABLE - RECTANGULAR,
PRODUCT TBD
FESTOON LIGHTING / SUPPORT POLES
DETAIL H
SHEET L1.53
S.S BIKE RACK, PRODUCT TBD
SA-4
SA-4A
SA-8
DOG WASTE RECEPTACLE,
PRODUCT TBD
SA-8A
SA-9
P-4 CONCRETE STAIR
C-1
CURB & WALL LEGEND
W-1
CONCRETE CURB - PLANTER CURB
W-2
FENCE & RAILING LEGEND
R-1 S.S HANDRAIL
F-2 POOL ENCLOSURE FENCE - GLASS
F-1 SECURITY FENCE @ 2ND FLOOR ENTRY
- GLASS
METAL PLANTER, PRODUCT TBD
C.I.P CONCRETE WALL
W-3 C.I.P CONCRETE WALL W/ WOOD TOP
W-3A C.I.P CONCRETE WALL W/ WOOD
PLATFORM
GATE LEGEND
G-1
G-2
ACCESS GATE @ 2ND FLOOR ENTRY
GLASS
POOL ENCLOSURE GATE - GLASS
OVERHEAD TRELLIS C
CUSTOM
OVERHEAD TRELLIS A
CUSTOM
OVERHEAD TRELLIS B
CUSTOM
OUTDOOR CONCRETE PING PONG
TABLE, PRODUCT TBD
WOOD BENCH ATTACHED TO STEEL
PLANTER, PRODUCT TBD
WOOD SCREEN W/ STEEL FRAME,
WOOD MATERIAL TBD
FITNESS EQUIPMENT - BALANCING BEAM
PRODUCT TBD
FITNESS EQUIPMENT - SINGLE AIR
WALKER, PRODUCT TBD
WOOD BENCH - VESTRE COAST
DETAIL O
SHEET L1.53
PER
MANUFACTURER
DETAIL E
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL A
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL M
SHEET L1.53
DETAIL H
SHEET L1.52
DETAIL G
SHEET L1.51
DETAIL F
SHEET L1.52
DETAILS E,F
SHEET L1.51
DETAIL M
SHEET L1.51
DETAILS C,D
SHEET L1.51
DETAILS A,B
SHEET L1.51
DETAIL A
SHEET L1.51
PICNIC TABLE - IN GROUND, PRODUCT
TBD SA-12
P-3A SYNTHETIC TURF
@ DOG RELIEF
DETAILS C,D
SHEET L1.51
SA-6A WOOD BENCH - L SHAPED VESTRE
P-1A CONCRETE PAVING B:
(ON STRUCTURE)
DETAIL B
SHEET L1.51
W-4 CMU BURNISHED BLOCK WALL DETAIL E
SHEET L1.51
CONCRETE SEATING CUBES, PRODUCT
TBD SA-13
W-5 FEATURE WALL CMU BLOCK
W/ PLASTER FINISH
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
P-5 CONCRETE RAMP
-
SA-2B WOOD BENCH ATTACHED TO CMU
PLANTER, WOOD MATERIAL TBD
PER
MANUFACTURER -
PER
MANUFACTURER -----
PER
MANUFACTURER
DETAIL I
SHEET L1.52
DETAIL H
SHEET L1.53
BAR HEIGHT TABLE AND STOOLS,
PRODUCT TBD SA-14 PER
MANUFACTURER
SA-14
1.10 ORANGE ST
CALIFORNIA AVE
2ND LEVEL
CONSTRUCTION
PLAN
CENTRAL AVE
NOT FOR CONSTRUC12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
PHASE 1
PHASE 2
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
CONSTRUCTION
PLAN -
LEVEL 6 & 8
L1.03
W-3 TYP.
P-3 TYP.
W-2 TYP.
SA-11A TYP.
SA-8A TYP.
SA-2 TYP.
PA
PA
PA
PA
PA
PA
PA
PA
SA-2 TYP.
W-4 TYP.
P-1A
EIGHTH FLOOR
EIGHTH FLOOR
PAVING LEGEND
ITEM DESCRIPTION DETAIL
P-1
SA-3
SITE AMENITIES LEGEND
SA-1
P-2
P-3
GRILL COUNTER A
BURNISHED BLOCK W/ (2) GRILLS
SYNTHETIC TURF
SA-2A
SA-7
SA-7B
GRILL COUNTER B
BURNISHED BLOCK W/ (1) GRILLS
FIRE TABLE - SQUARE,
PRODUCT TBD
SA-10
SA-11
CONCRETE PAVING A:
NAT. GRAY W/ TOP CAST 5
CONCRETE PAVING C:
W/ APPLIED SEALER
SA-11A
SA-5
SA-6
SA-7A
FIRE TABLE - RECTANGULAR,
PRODUCT TBD
FESTOON LIGHTING / SUPPORT POLES
DETAIL H
SHEET L1.53
S.S BIKE RACK, PRODUCT TBD
SA-4
SA-4A
SA-8
DOG WASTE RECEPTACLE,
PRODUCT TBD
SA-8A
SA-9
P-4 CONCRETE STAIR
C-1
CURB & WALL LEGEND
W-1
CONCRETE CURB - PLANTER CURB
W-2
FENCE & RAILING LEGEND
R-1 S.S HANDRAIL
F-2 POOL ENCLOSURE FENCE - GLASS
F-1 SECURITY FENCE @ 2ND FLOOR ENTRY
- GLASS
METAL PLANTER, PRODUCT TBD
C.I.P CONCRETE WALL
W-3 C.I.P CONCRETE WALL W/ WOOD TOP
W-3A C.I.P CONCRETE WALL W/ WOOD
PLATFORM
GATE LEGEND
G-1
G-2
ACCESS GATE @ 2ND FLOOR ENTRY
GLASS
POOL ENCLOSURE GATE - GLASS
OVERHEAD TRELLIS C
CUSTOM
OVERHEAD TRELLIS A
CUSTOM
OVERHEAD TRELLIS B
CUSTOM
OUTDOOR CONCRETE PING PONG
TABLE, PRODUCT TBD
WOOD BENCH ATTACHED TO STEEL
PLANTER, PRODUCT TBD
WOOD SCREEN W/ STEEL FRAME,
WOOD MATERIAL TBD
FITNESS EQUIPMENT - BALANCING BEAM
PRODUCT TBD
FITNESS EQUIPMENT - SINGLE AIR
WALKER, PRODUCT TBD
WOOD BENCH - VESTRE COAST
DETAIL O
SHEET L1.53
PER
MANUFACTURER
DETAIL E
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL A
SHEET L1.53
DETAIL F
SHEET L1.53
DETAIL M
SHEET L1.53
DETAIL H
SHEET L1.52
DETAIL G
SHEET L1.51
DETAIL F
SHEET L1.52
DETAILS E,F
SHEET L1.51
DETAIL M
SHEET L1.51
DETAILS C,D
SHEET L1.51
DETAILS A,B
SHEET L1.51
DETAIL A
SHEET L1.51
PICNIC TABLE - IN GROUND, PRODUCT
TBD SA-12
P-3A SYNTHETIC TURF
@ DOG RELIEF
DETAILS C,D
SHEET L1.51
SA-6A WOOD BENCH - L SHAPED VESTRE
P-1A CONCRETE PAVING B:
(ON STRUCTURE)
DETAIL B
SHEET L1.51
W-4 CMU BURNISHED BLOCK WALL DETAIL E
SHEET L1.51
CONCRETE SEATING CUBES, PRODUCT
TBD SA-13
W-5 FEATURE WALL CMU BLOCK
W/ PLASTER FINISH
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
PER
MANUFACTURER
P-5 CONCRETE RAMP
-
SA-2B WOOD BENCH ATTACHED TO CMU
PLANTER, WOOD MATERIAL TBD
PER
MANUFACTURER -
PER
MANUFACTURER -----
PER
MANUFACTURER
DETAIL I
SHEET L1.52
DETAIL H
SHEET L1.53
BAR HEIGHT TABLE AND STOOLS,
PRODUCT TBD SA-14 PER
MANUFACTURER
1.30 ORANGE ST
CALIFORNIA AVE
ROOF DECKS
6TH & 8TH LEVEL
CONSTRUCTION
PLANS
NOT FOR CONSTRUCCENTRAL AVE
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
CONCRETE PAVING, NATURAL GRAY
CMU BLOCK PLANTER WALL W/ BURNISHED FINISH
TURF PLATFORM
METAL TREE PLANTER
SEALED CONCRETE PAVING BANDS
STEEL OVERHEAD STRUCTURE
CONCRETE FIRE TABLE
WOOD BENCH ATTACHED TO PLANTER
CONCRETE SEAT WALL WITH WOOD TOP
CONCRETE SEATING CUBE
PING-PONG TABLE
STEEL OVERHEAD STRUCTURE
TREE PLANTER WITH WOOD PLATFORM
FEATURE WINDOW WALL
BAR HEIGHT COUNTER
WOOD BENCH
HARDSCAPE
MATERIAL
BOARD
Ground Level Hardscape Material
Podium Level Hardscape Material
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 L1.40 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
A
B
C
D
E
F
G
M
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
CONSTRUCTION
DETAILS
L1.51
Scale: 3" = 1'-0"
1. CONCRETE PAVING
2. 3
8" RADIUS AT EDGE OF WALK
3. FINISH GRADE:
- 1
2" BELOW F.S. FOR TURF AREAS
- 1 1
2" BELOW F.S. FOR SHRUB AREAS
4. GRADED COMPACTED AGGREGATE
SUB-BASE
5. COMPACTED OR NATIVE UNDISTURBED
SUB-GRADE, TYP.
3"
CLR.
1 3
2 Concrete Paving, Typ. (On Grade)
4 5
P-1 P-2
1. CONCRETE PAVING, REFER TO
CONSTRUCTION LEGEND FOR COLOR AND
FINISH
2. WATERPROOFING
3. STRUCTURAL SLAB - REFER TO
ARCHITECTURAL DRAWINGS
4. GEOFOAM FILL
NOTES:
A. SEE CONSTRUCTION PLANS FOR LOCATION
OF JOINTS
5" MAX - 3" MIN.
2 1
Scale: 3" = 1'-0"
Concrete Paving on Structure P-1 P-2
PER ARCHITECTURE
3 4
1. SYNTHETIC TURF, INSTALL PER
MANUFACTURER'S SPECIFICATIONS
2. WELL-DRAINING ANGULAR AGGREGATE
BASE, 3
8" - 12" TYP., COMPACTED TO 90%
PER MANUFACTURER RECOMMENDATIONS
3. COMPOSITE (PLASTIC) NAILER BOARD,
ATTACH TURF WITH 1"-2" GALVANIZED NAIL
AT 36" O.C., ATTACH NAILER BOARD TO
ADJACENT CONCRETE WITH 1
2" CONCRETE
SCREW ANCHOR AT 36" O.C. (PRE-DRILL
CONCRETE)
4. ADJACENT PAVING PER PLAN
5. STRUCTURAL SLAB - PER ARCHITECT
Synthetic Turf on Structure
Scale: 3" = 1'-0"
1 2
3 5
3 4
"
SLOPE TO DRAIN
4 P-3
1. S.S. TUBE RAIL; SEE DETAIL M/ L1.53
2. P.I.P. CONCRETE STAIRS
3. SEE NOSE ENLARGEMENT THIS DETAIL
4. 1/2" RADIUS NOSE, TYPICAL ALL STAIR EDGES AND SIDES
5. BATTER, TYPICAL EACH RISER
6. (4) 1
4" WIDE x 14" DEEP SAWCUTS SPACED AT 3
8" TO EXTEND FULL WIDTH OF
THE STEP, TERMINATED WITH PERPENDICULAR SAWCUT, STAIN WITH
CONTRASTING COLOR, QC PATINA STAIN, PROVIDE SAMPLE FOR APPROVAL,
SEE STAIR NOSE ENLARGEMENT HEREIN FOR MORE INFORMATION
7. CONCRETE STAIR REINFORCEMENT AND FOOTING
8. STRUCTURAL SLAB - PER ARCHITECT
9. ADJACENT PAVING - PER PLAN
10. GEOFOAM FILL
Concrete Stairs
Scale: 3/4" = 1'-0"
Stair Nose Enlargement
Scale: NTS
1"
2" MIN.
4" MAX.
4 5
6 1"
P-4 R-1
PER ARCHITECTURE
6"
1 9
10 7
8 1
1 3
1'-6" (TYP.)
2 10 7 10 10
1. ADJACENT CONCRETE PAVING W/ 1
4" RADIUS EDGE, PER PLAN
2. SYNTHETIC TURF
3. 2" X 4" RECYCLED PLASTIC LUMBER PERIMETER NAILER BOARD, ATTACH TO CONCRETE WITH ONE 4" EXPANSION ANCHOR
EVERY 24" O.C.
4. 'AIRDRAIN K9' DRAINAGE SYSTEM BY AIRFIELD SYSTEMS
5. PERMEABLE GEOTEXTILE FILTER FABRIC
6. CRUSHED AGGREGATE
7. SLOPING SLAB, SLOPE TO DRAIN
8. WATERPROOFING
9. DRAIN
10. STRUCTURAL SLAB - PER ARCHITECT
11. 6" DIA. BRASS DRAIN GRATE
2 4
5 6
7 8
1 2"
Synthetic Turf @ Dog Relief Area
Scale: 3" = 1'-0"
P-3A
1 3
9 10
11 1. P.I.P. CONCRETE PLANTER CURB
2. 3/8" RADIUS AT ALL EXPOSED EDGES
3. #3 REBAR - CONTINUOUS & CENTERED IN
CURB
4. ADJACENT PLANTING AREA
5. SYNTHETIC TURF, PER DETAIL C & D/L1.51
6. STRUCTURAL SLAB - PER ARCHITECT
Concrete Planter Curb at Artificial Turf
Scale: 3" = 1'-0"
4"
5 2
4 1
3 6
4"
C-1
6"
2 1
PER ARCHITECTURE
Concrete Planter Curb at Concrete Paving
Scale: 3" = 1'-0"
C-1
1. P.I.P. CONCRETE CURB
2. 3/8" RADIUS AT ALL EXPOSED EDGES
3. #3 REBAR - CONTINUOUS & CENTERED IN
CURB
4. ADJACENT PLANTING AREA
5. GEOFOAM FILL
6. ADJACENT PAVING - PER PLAN
7. WATERPROOFING
8. STRUCTURAL SLAB - PER ARCHITECT
4 6
3 5
8 7
6" PER ARCHITECTURE
9 6
2 5
4 5
Stairs W/ Wood Platform
Scale: 1/2" = 1'-0"
1. 2" X 6" WOOD PLANKS, WOOD MATERIAL TBD
2. P.I.P CONCRETE SEAT WALL
3. STAIRS & HANDRAIL, BEYOND.
4. EXPANSION JOINT
5. ADJACENT PAVING PER PLAN
6. STRUCTURAL SLAB - PER ARCHITECT
7. GEOFOAM FILL
8. WATERPROOFING
9. 1/2" RADIUS
10. PRESSURE TREATED WOOD SLEEPER
W-3
1 3
(BEYOND)
(BEYOND)
7 3
10 NOT FOR CONSTRUCUNDER DEVELOPMENT
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
I E
F
H
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
CONSTRUCTION
DETAILS
L1.52
PER PLAN
30" MIN. / 42" MAX.
1. 4"X8"X16" BURNISHED CMU BLOCK WALL
2. BURNISHED C.M.U. CAP TO MATCH WALL
3. ADJACENT FINISH SURFACE
4. IRRIGATION
5. PLANTER ATRIUM DRAIN
6. 3
4" WASHED CRUSHED ROCK, WRAPPED IN 140 NC MIRAFI
FILTER FABRIC
7. PLANTER DRAIN PENETRATION AND 2-STAGE DRAIN
8. STRUCTURAL SLAB PER ARCHITECTURAL DRAWINGS
9. PLANTER BACKFILL
10. WATERPROOFING
11. TOPPING SLAB IN PLANTER SEE STRUCTURAL DRAWINGS,
SLOPE TO DRAIN
12. EXTRUDED ALUMINUM TERMINATION BAR
13. COVER MULCH
14. OVERFLOW ATRIUM DRAIN, TOP OF GRATE TO BE 1
2" BELOW
TOP OF WALL
15. LONGITUDINAL PERFORATED PVC PIPE, WRAPPED IN
NON-WOVEN GEOTEXTILE MEMBRANE, CONNECT TO PLANTER
DRAIN
16. TOP OF WALL BEYOND
17. FINISH GRADE
18. FACE OF BUILDING WHERE APPLICABLE
3 1
Scale: 3/4"=1'-0"
Planter Wall on Structure - Burnished Block
12 13
2 SLOPE TO DRAIN
4" CLEAR TO SOIL
11 8
4 13
7 8" MAX.
14 17
16 5
18 PER PLAN
9" TYP.
1'-6" TYP.
1% MIN. 9
15 10
6 W-4
1. P.I.P CONCRETE WALL
2. IRRIGATION
3. PLANTER ATRIUM DRAIN
4. 3
4" WASHED CRUSHED ROCK, WRAPPED IN 140 NC MIRAFI
FILTER FABRIC
5. PLANTER DRAIN PENETRATION AND 2-STAGE DRAIN
6. STRUCTURAL SLAB PER ARCHITECTURAL DRAWINGS
7. PLANTER BACKFILL
8. WATERPROOFING
9. TOPPING SLAB IN PLANTER SEE STRUCTURAL DRAWINGS,
SLOPE TO DRAIN
10. EXTRUDED ALUMINUM TERMINATION BAR
11. COVER MULCH
12. OVERFLOW ATRIUM DRAIN, TOP OF GRATE TO BE 1
2" BELOW
TOP OF WALL
13. LONGITUDINAL PERFORATED PVC PIPE, WRAPPED IN
NON-WOVEN GEOTEXTILE MEMBRANE, CONNECT TO PLANTER
DRAIN
14. TOP OF WALL BEYOND
15. FINISH GRADE
16. 1/2" RADIUS
17. ADJACENT FINISH SURFACE
17 4
Scale: 3/4"=1'-0"
P.I.P Concrete Planter Wall
10 1
SLOPE TO DRAIN
4" CLEAR TO SOIL
1% MIN.
9 6
2 11
5 8" MAX.
12 15
14 3
7 PER PLAN
8 4
16 W-2
PER ARCH 6"
13 Section A
10'-0"
Plan
Scale: 3/4" = 1'-0"
W-3A
A
Section B
1. P.I.P. CONCRETE PLANTER WALL
2. 2"X6" WOOD PLANKS - MITERED CORNERS, WOOD
MATERIAL TBD
3. STEEL 2"X2" BEAM
4. STEEL 2"X3" FRAME, RECESSED
5. STRUCTURAL SLAB
6. WATERPROOFING
7. GEOFOAM FILL
8. EXPANSION JOINT
9. FINISH SURFACE
10. PLANTING MIX
11. TREE, PER PLANTING PLAN
6'-0"
B
3 4
2 11
6 1
10 6
5 8
9 7
6 1
8 9
7 3
4 2
10 6
5 4
3 1
2 2'-0" PER ARCHITECT
6"
2"
4"
4'-5"
EQ. EQ. EQ. EQ.
3'-6"
1'-0" 1'-0"
1'-0"
11 Tree Planter with Wood Platform
1. PLANTER ON STRUCTURE, SEE DETAIL E/L1.52
2. ADJACENT FINISH SURFACE
3. STRUCTURAL SLAB PER ARCHITECTURAL
DRAWINGS
4. WATERPROOFING
5. WOOD PLANK - MITERED CORNERS. WOOD
MATERIAL TBD
6. 2"X2" TUBE STEEL SUPPORT EMBEDDED IN
CMU WALL
7. 3"X1"X 3/16" RECTANGULAR TUBE FRAME
Scale: 3/4"=1'-0"
Wood Bench at the CMU Planter Wall
3 W-4
1 6
7 5
2 1'-8"
1'-6"
4 NOT FOR CONSTRUCUNDER DEVELOPMENT
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
F
H
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
CONSTRUCTION
DETAILS
L1.53
Elevation 1
Overhead Structure W/ Wood Screen
1. 2" x 4" WOOD SLATS W/ EQUAL SPACING
2. 5" x 6" x 1/4" HSS, PRIMED & PAINTED
3. 5" x 5" x 5/16" HSS, PRIMED & PAINTED
4. 3" x 3", 1/4" HSS, HORIZONTAL STEEL TUBES,
PRIMED AND PAINTED
5. LIGHT FIXTURE; DOWNLIGHT FIXTURES
6. WOOD SCREEN BEHIND. WOOD PRODUCT TBD.
7. FINISH SURFACE
Scale: 3/8" = 1'-0"
SA-7
5 2
3 1
5 6
3 7
SA-3
Elevation 1
7 EQ. 15'-0" EQ. 7'-0"
1'-0"
1'-0"
9'-0"
6"
PER PLAN
2 PER PLAN
4 EQ. EQ.
4 Overhead Structure Against Railing
Scale: 3/8" = 1'-0"
SA-7A
10'-0"
10'-0"
6"
1. 5" x 6" x 1/4" HSS, PRIMED & PAINTED
2. 5" x 5" x 5/16" HSS, PRIMED & PAINTED
3. LIGHT FIXTURE; DOWNLIGHT FIXTURES
4. OVERHEAD HEATER
5. ADJACENT PAVING - PER PLAN
6. PLANTER ON STRUCTURE, SEE DETAIL E/L1.52
7. GUARDRAIL - PER ARCHITECT
8. EMBEDDED PLATE
9. STRUCTURAL SLAB - PER ARCHITECT
10. WATERPROOFING
NOTES:
A. POSTS TO ALIGN WITH PLANTER EDGE
B. OVERHEAD HEATER TO BE PLACED OVER
EACH LOUNGE AREA
Elevation 1
SPACE POSTS EQUALLY 10'-0" MAX O.C.
10'-0"
6"
Elevation 2
WALKWAY
PER PLAN
6 BEYOND
2 5
10 3
1 4
2 6
7 5
9 3
1 4
10 8
9 8
Pool Enclosure Fence - Glass
Scale: 1/2" = 1'-0"
5'-0"
4'-8" MAX.
2" TYP.
2 5
6 2
1 4
1 1. 3/8" THICK CLEAR TEMPERED GLASS VIEW
PANEL
2. 2 5
8" x 2" ALUMINUM POST, C.R. LAURENCE
ALUMINUM WINDSCREEN SYSTEM
W/RECTANGULAR POSTS, POWDER COAT
FINISH
3. GALVANIZED STEEL STANCHION INSIDE
POST
4. FLAT POLISHED EDGE, TYP.
5. FINISH SURFACE
6. POST CONNECTION AND REINFORCEMENT
7. STRUCTURAL SLAB - PER ARCHITECT
Elevation Section
7 F-2
Security Fence and Gate - Glass
Scale: 1/2" = 1'-0"
F-1
2" TYP.
3'-6"
6'-0"
43" (42" MIN./44" MAX. PER CODE)
10"
4 5
3 1
8 1. ALUMINUM GATE FRAME
2. ALUMINUM POST
3. 1
4" THICK x 12" STEEL U-CHANNEL FRAME TO
HOLD GLASS
4. 3
8" TEMPERED SAFETY GLASS PANEL
5. EXIT DEVICE - LOCATE ON BACK SIDE OF GATE
6. FOBBED ENTRY AND KNOX BOX AS REQUIRED
7. SELF CLOSING GATE HINGE
8. LATCH ASSEMBLY
9. FINISH SURFACE
10. POST CONNECTION AND REINFORCEMENT
6 Section A
Elevation
A
2 7
9 4'-8" MAX.
G-1
4 2
9 10
POOL HOURS
2" TYP.
3'-6"
5'-0"
43" (42" MIN./44" MAX. PER CODE)
10"
Pool Enclosure Gate - Glass
Scale: 1/2" = 1'-0"
10 4
3 1
9 5
7 2 8
1. ALUMINUM GATE FRAME
2. ALUMINUM POST
3. 1
4" THICK x 12" STEEL U-CHANNEL
FRAME TO HOLD GLASS
4. 3
8" TEMPERED SAFETY GLASS
PANEL
5. EXIT DEVICE - LOCATE ON BACK
SIDE OF GATE
6. FOBBED ENTRY AND KNOX BOX
AS REQUIRED
7. SELF CLOSING GATE HINGE
8. POOL SIGNAGE PACKAGE BY
OTHERS, "EMERGENCY EXIT"
SHALL BE LABELED AT LEAST 4'
HIGH ON POOL SIDE
9. LATCH ASSEMBLY
10. FINISH SURFACE
6 G-2
1. 1" X 2" X 3
16" PAINTED STEEL TUBE RAIL
2. P.I.P. CONCRETE STAIRS; SEE DETAIL M/L1.51
3. POST CONNECTION
4. CONCRETE STAIR REINFORCEMENT AND FOOTING
5. ADJACENT PAVING - PER PLAN
6. CORE DRILL 4" DIAMETER HOLE AND SET HANDRAIL POST WITH POR-ROK NOTES:
A. GRIND ALL WELDS SMOOTH, REMOVE ALL LOSE MILL, SCALE RUST, OIL & GREASE
Concrete Stairs and Handrail
Scale: 3/4" = 1'-0"
R-1
3'-0"
1'-0" MIN.
PARALLEL
TO F.S.
(1) TREAD + 1'-0"
(2'-6" MIN.)
LAST RISER
NOSING
4'-0" MAX.
FIRST RISER
NOSING
1'-0" MIN.
PARALLEL
TO F.S.
8"
1 3
5 3
1 3'-0"
1 2
8"
6 4
4"
EQ EQ
EQ EQ
M F A
O
NOT FOR CONSTRUCUNDER DEVELOPMENT
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
PHASE 1
PHASE 2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CCLL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
TS
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
PLANTING
PLAN -
GROUND LEVEL
L3.01
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
SYMBOL NAME
ACACIA COGNATA 'COUSIN ITT'
LITTLE RIVER WATTLE
PLANTING LEGEND: Shrubs
ACACIA CONVENYI
BLUE BUSH
ACHILLEA 'MOONSHINE'
FERN LEAF YARROW
AGAVE ATTENUATA
FOXTAIL AGAVE
ALOE 'BLUE ELF'
BLUE ELF ALOE
ARCTOSTAPHYLOS 'HOWARD MCMINN'
MANZANITA
ARCTOSTAPHYLOS 'PACIFIC MIST'
MANZANITA
CAREX DIVULSA
BERKELEY SEDGE
DIANELLA REVOLUTA 'LITTLE REV'
LITTLE REV FLAX LILY
GREVILLEA 'MOONLIGHT'
MOONLIGHT GREVILLEA
LOMANDRA LONGIFOLIA 'BREEZE'
DWARF MAT RUSH
MUHLENBERGIA CAPILLARIS 'WHITE CLOUD'
WHITE AWN MUHLY
OLEA EUROPAEA 'LITTLE OLLIE'
DWARF OLIVE
PELARGONIUM TOMENTOSUM
PEPPERMINT GERANIUM
PHLOMIS FRUTICOSA
JERUSALEM SAGE
SIZE
PHORMIUM 'YELLOW WAVE'
YELLOW NEW ZEALAND FLAX
PITTOSPORUM CRASSIFOLIUM 'COMPACTUM'
DWARF KARO
RHAMNUS CALIFORNICA 'LITTLE SUR'
DWARF COFFEEBERRY
ROSMARINUS 'HUNTINGTON CARPET'
ROSEMARY
SALVIA CLEVELANDII 'WINIFRED GILMAN'
CLEVELAND SAGE
WESTRINGIA FRUTICOSA 'SMOKEY'
COAST ROSEMARY
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
1 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
SYMBOL NAME
PLANTING LEGEND: Trees
ARBUTUS 'MARINA'
MARINA ARBUTUS
CERCIS OCCIDENTALIS
WESTERN REDBUD
LAGERSTROEMIA X FAURIEI 'NATCHEZ'
WHITE CRAPE MYRTLE
OLEA EUROPAEA 'SWAN HILL'
FRUITLESS OLIVE
SIZE
48"
BOX
60"
BOX
48"
BOX
PHOENIX DACTYLIFERA 'MEDJOOL'
MEDJOOL DATE PALM
18'
BTH
PLATANUS RACEMOSA
CALIFORNIA SYCAMORE
60"
BOX
PODOCARPUS GRACILIOR
YEW PINE
48"
BOX
QUERCUS ENGELMANNII
PASADENA OAK
72"
BOX
PINUS HALEPENSIS
ALEPPO PINE
36"
BOX
LAGERSTROEMIA INDICA 'MUSKOGEE'
CRAPE MYRTLE
48"
BOX
LAURUS NOBILIS
SWEET BABY
36"
BOX
CUPRESSUS SEMPERVIRENS 'GLAUCA'
ITALIAN CYPRESS
36"
BOX
60"
BOX
PLANTING LEGEND: Groundcover
SYMBOL NAME
LAWN
SIZE
SOD
36"
BOX
PLATANUS X ACERIFOLIA 'BLOODGOOD'
LONDON PLANE TREE
36"
BOX
HANDROANTHUS HEPTAPHYLLUS
PINK TRUMPET TREE
36"
BOX
2.00 ORANGE ST
CALIFORNIA AVE
GROUND LEVEL
PLANTING PLAN
NOT FOR CONSTRUCCENTRAL AVE
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
PHASE 1
PHASE 2
POOL
SPA
SPA
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
PLANTING
PLAN -
LEVEL 2
L3.02
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
SYMBOL NAME
ACACIA COGNATA 'COUSIN ITT'
LITTLE RIVER WATTLE
PLANTING LEGEND: Shrubs
ACACIA CONVENYI
BLUE BUSH
ACHILLEA 'MOONSHINE'
FERN LEAF YARROW
AGAVE ATTENUATA
FOXTAIL AGAVE
ALOE 'BLUE ELF'
BLUE ELF ALOE
ARCTOSTAPHYLOS 'HOWARD MCMINN'
MANZANITA
ARCTOSTAPHYLOS 'PACIFIC MIST'
MANZANITA
CAREX DIVULSA
BERKELEY SEDGE
DIANELLA REVOLUTA 'LITTLE REV'
LITTLE REV FLAX LILY
GREVILLEA 'MOONLIGHT'
MOONLIGHT GREVILLEA
LOMANDRA LONGIFOLIA 'BREEZE'
DWARF MAT RUSH
MUHLENBERGIA CAPILLARIS 'WHITE CLOUD'
WHITE AWN MUHLY
OLEA EUROPAEA 'LITTLE OLLIE'
DWARF OLIVE
PELARGONIUM TOMENTOSUM
PEPPERMINT GERANIUM
PHLOMIS FRUTICOSA
JERUSALEM SAGE
SIZE
PHORMIUM 'YELLOW WAVE'
YELLOW NEW ZEALAND FLAX
PITTOSPORUM CRASSIFOLIUM 'COMPACTUM'
DWARF KARO
RHAMNUS CALIFORNICA 'LITTLE SUR'
DWARF COFFEEBERRY
ROSMARINUS 'HUNTINGTON CARPET'
ROSEMARY
SALVIA CLEVELANDII 'WINIFRED GILMAN'
CLEVELAND SAGE
WESTRINGIA FRUTICOSA 'SMOKEY'
COAST ROSEMARY
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
1 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
SYMBOL NAME
PLANTING LEGEND: Trees
ARBUTUS 'MARINA'
MARINA ARBUTUS
CERCIS OCCIDENTALIS
WESTERN REDBUD
LAGERSTROEMIA X FAURIEI 'NATCHEZ'
WHITE CRAPE MYRTLE
OLEA EUROPAEA 'SWAN HILL'
FRUITLESS OLIVE
SIZE
48"
BOX
60"
BOX
48"
BOX
PHOENIX DACTYLIFERA 'MEDJOOL'
MEDJOOL DATE PALM
18'
BTH
PLATANUS RACEMOSA
CALIFORNIA SYCAMORE
60"
BOX
PODOCARPUS GRACILIOR
YEW PINE
48"
BOX
QUERCUS ENGELMANNII
PASADENA OAK
72"
BOX
PINUS HALEPENSIS
ALEPPO PINE
36"
BOX
LAGERSTROEMIA INDICA 'MUSKOGEE'
CRAPE MYRTLE
48"
BOX
LAURUS NOBILIS
SWEET BABY
36"
BOX
CUPRESSUS SEMPERVIRENS 'GLAUCA'
ITALIAN CYPRESS
36"
BOX
60"
BOX
PLANTING LEGEND: Groundcover
SYMBOL NAME
LAWN
SIZE
SOD
36"
BOX
PLATANUS X ACERIFOLIA 'BLOODGOOD'
LONDON PLANE TREE
36"
BOX
HANDROANTHUS HEPTAPHYLLUS
PINK TRUMPET TREE
36"
BOX
2.10 ORANGE ST
CALIFORNIA AVE
2ND LEVEL
PLANTING PLAN
NOT FOR CONSTRUCCENTRAL AVE
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp 1 08/09/22 Stage I Preliminary Design 2 Stage II Progress Set V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
PHASE 1
PHASE 2
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design 2 Stage II Submittal V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
0 4 8 16 32 Feet
Scale: 1/16" = 1'-0"
PLANTING
PLAN -
LEVEL 6 & 8
L3.03
Key Map
LW
LW
LW 1BD LW LW LW LW 1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2118 SF
Flex Space /
Business
Lounge
Trash
Utility
Trash
2BD
PLAZA PLAZA
PLAZA PLAZA
PASEO
PASEO
+540.0
1BD
2812 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1364 SF
Lobby
LW
LW
LW
1194 SF
2BD
Trash
Trash
Utility Main Elec.
Room
Transformer
Room
2BD
Transformer
Room
Main Elec.
Room Utility
Utility
POOL
ABOVE
POOL
ABOVE
LEVEL 1 PARKING
119 SPACES (17 IN-UNIT)
PHASE 1
PHASE 2
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
PRIVATE
GARAGE
LOADING
LOADING
DN TO
LEVEL P1
PRIVATE
GARAGE
Entry
2300 SF
Fitness
1527 SF
Flex Space /
Business
Lounge
Entry
Entry
Entry
SPA
ABOVE
POOL EQPT ROOM
468 SF
Dog Spa
DN TO
LEVEL P1
15%
15%
211 SF
Mens
244 SF
Womens
400 SF
Parcel
92 SF
AV
275 SF
Break Rm
288 SF
Work Room
200 SF
Office 200 SF
Office
Lobby
776 SF
Game Room
220 SF
FC
+536.0
+541.0
2.5%
6.4%
GATE
GATE
VAN
VAN
584 SF
Speak Easy
+543 +539
576 SF
Speak Easy
401 SF
Parcel
Mail
255 SF
Cold Storage
Mail Entry
140 SF
FC
CCLL
W CALIFORNIA AVE
N ORANGE ST
N CENTRAL AVE
PHASE 1
PHASE 2
SYMBOL NAME
ACACIA COGNATA 'COUSIN ITT'
LITTLE RIVER WATTLE
PLANTING LEGEND: Shrubs
ACACIA CONVENYI
BLUE BUSH
ACHILLEA 'MOONSHINE'
FERN LEAF YARROW
AGAVE ATTENUATA
FOXTAIL AGAVE
ALOE 'BLUE ELF'
BLUE ELF ALOE
ARCTOSTAPHYLOS 'HOWARD MCMINN'
MANZANITA
ARCTOSTAPHYLOS 'PACIFIC MIST'
MANZANITA
CAREX DIVULSA
BERKELEY SEDGE
DIANELLA REVOLUTA 'LITTLE REV'
LITTLE REV FLAX LILY
GREVILLEA 'MOONLIGHT'
MOONLIGHT GREVILLEA
LOMANDRA LONGIFOLIA 'BREEZE'
DWARF MAT RUSH
MUHLENBERGIA CAPILLARIS 'WHITE CLOUD'
WHITE AWN MUHLY
OLEA EUROPAEA 'LITTLE OLLIE'
DWARF OLIVE
PELARGONIUM TOMENTOSUM
PEPPERMINT GERANIUM
PHLOMIS FRUTICOSA
JERUSALEM SAGE
SIZE
PHORMIUM 'YELLOW WAVE'
YELLOW NEW ZEALAND FLAX
PITTOSPORUM CRASSIFOLIUM 'COMPACTUM'
DWARF KARO
RHAMNUS CALIFORNICA 'LITTLE SUR'
DWARF COFFEEBERRY
ROSMARINUS 'HUNTINGTON CARPET'
ROSEMARY
SALVIA CLEVELANDII 'WINIFRED GILMAN'
CLEVELAND SAGE
WESTRINGIA FRUTICOSA 'SMOKEY'
COAST ROSEMARY
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
1 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
5 GAL
SYMBOL NAME
PLANTING LEGEND: Trees
ARBUTUS 'MARINA'
MARINA ARBUTUS
CERCIS OCCIDENTALIS
WESTERN REDBUD
LAGERSTROEMIA X FAURIEI 'NATCHEZ'
WHITE CRAPE MYRTLE
OLEA EUROPAEA 'SWAN HILL'
FRUITLESS OLIVE
SIZE
48"
BOX
60"
BOX
48"
BOX
PHOENIX DACTYLIFERA 'MEDJOOL'
MEDJOOL DATE PALM
18'
BTH
PLATANUS RACEMOSA
CALIFORNIA SYCAMORE
60"
BOX
PODOCARPUS GRACILIOR
YEW PINE
48"
BOX
QUERCUS ENGELMANNII
PASADENA OAK
72"
BOX
PINUS HALEPENSIS
ALEPPO PINE
36"
BOX
LAGERSTROEMIA INDICA 'MUSKOGEE'
CRAPE MYRTLE
48"
BOX
LAURUS NOBILIS
SWEET BABY
36"
BOX
CUPRESSUS SEMPERVIRENS 'GLAUCA'
ITALIAN CYPRESS
36"
BOX
60"
BOX
PLANTING LEGEND: Groundcover
SYMBOL NAME
LAWN
SIZE
SOD
36"
BOX
PLATANUS X ACERIFOLIA 'BLOODGOOD'
LONDON PLANE TREE
36"
BOX
HANDROANTHUS HEPTAPHYLLUS
PINK TRUMPET TREE
36"
BOX
EIGHTH FLOOR
EIGHTH FLOOR
2.20 ORANGE ST
CALIFORNIA AVE
ROOF DECKS
6TH & 8TH LEVEL
PLANTING
PLANS
NOT FOR CONSTRUCCENTRAL AVE
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
PALMS & TREES
SHRUBS & GROUND COVER
Phoenix dactylifera ‘Medjool’
Medjool Date Palm
Pittosporum crassifolium ‘Compactum’
Dwarf Karo
Rhamnus californica ‘Little Sur’
Dwarf Coffeeberry
Lagerstroemia x fauriei ‘Natchez’
White Crape Myrtle
Rosmarinus ‘Huntington Carpet’
Rosemary
Olea europaea ‘Swan Hill’
Fruitless Olive
Salvia clevelandii ‘Winifred Gilman’
Cleveland Sage
Laurus Nobilis
Sweet Baby
Platanus x Acerifolia ‘Bloodgood’
London Plane Tree
Platanus racemosa
Califonia Sycamore
Pinus halepensis
Aleppo Pine
Westringia fruticosa ‘Smokey’
Coast Rosemary
Lagerstroemia indica ‘Muskogee’
Crape Myrtle
Handroanthus heptaphyllus
Pink Trumpet Tree
Podocarpus Gracilior
Yew Pine
Arbutus ‘Marina’
Marina Arbutus
Cupressus sempervirens ‘Glauca’
Italian Cypress
Quercus engelmannii
Pasadena Oak
Cercis occidentalis
Western Redbud
Acacia cognata ‘Cousin It’
Cousin It Acacia
Achillea ‘Moonshine’
Fern Leaf Yarrow
Arctostaphylos ‘Pacific Mist’
Manzanita
Acacia covenyi
Blue Bush
Aloe ‘Blue Elf’
Blue Elf Aloe
Carex Divulsa
Berkley Sedge
Agave attenuata
Fox Tail Agave
Arctostaphylos ‘Howard Mcminn’
Manzanita
Dianella Revoluta ‘Little Rev’
Little Rev Flax Lily
Grevillea ‘Moonlight’
Moonlight Grevillea
Lomandra longifolia ‘Breeze’
Dwarf Mat Rush
Muhlenbergia capillaris ‘White Cloud’
White Awn Muhly
Pelargonium tomentosum
Peppermint Geranium
Olea europaea ‘Little Ollie’
Dwarf Olive
Phlomis fruticosa
Jerusalem Sage
Phormium ‘Yellow Wave’
Yellow New Zealand Flax
2.40 PLANT PALETTE
12/29/23
12/29/23
project status
12/20/23
Stage II Submittal
12/29/23 4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CC
LL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CC
LL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
LW
LW
LW 1BD LW LW LW LW
1BD 1BD
2BD
1BD
2BD
785 SF
Virtual Golf
2102 SF
Flex Space /
Business
Lounge
Trash
Elec. Room #3
Trash
1BD
2774 SF
Lobby
LW LW 1BD LW LW LW LW LW
1BD 1BD
1374 SF
Lobby
LW
LW
LW
1190 SF
2BD
Trash
Trash
Dom. & Fire
Pump Room
Main Elec.
TransformerRoom
Room
Retail/Restaurant
Transformer
Room
Main Elec.
Room
Dom. & Fire
Pump Room
Elec. Room #2
2082 SF
Fitness
1496 SF
Flex Space /
Business
Lounge
426 SF
Dog Spa
180 SF
Men's
220 SF
Women's
361 SF
Parcel
92 SF
AV
238 SF
Break Rm
288 SF
Work Room
174 SF
Office
174 SF
Office
776 SF
Game Room
221 SF
FC
584 SF
Speak Easy
574 SF
Speak Easy
400 SF
Parcel
255 SF
Cold Storage
140 SF
FC
CC
LL
Trash
1BD
1BD
Pool Equip.
Room
166 SF
MPOE
ORANGE ST
CALIFORNIA AVE
CENTRAL AVE
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
FX-1 BOLLARD LIGHT IN PLANTING
FX-2
FX-3
FX-4
FX-5
FX-6
FX-7
TREE UPLIGHT
RECESSED WALL LUMINAIRE
WALL-MOUNTED FLOOD DOWNLIGHT
LED STRIP LIGHT
STRUCTURE MOUNTED DOWNLIGHT
CITY APPROVED
PEDESTRIAN STREET LIGHTS
LIGHTING LEGEND
ITEM SYMBOL DESCRIPTION
NOTES:
INFORMATION PROVIDED IS FOR PRELIMINARY LIGHTING
CONCEPT ONLY. ALL FINAL FIXTURE SELECTIONS, QUANTITY,
AND LOCATION WILL BE PROVIDED BY ELECTRICAL ENGINEER
BASED ON PHOTOMETRIC STUDIES. BUILDING WALL-MOUNTED
LIGHTS ARE NOT SHOWN.
FX-8 FESTOON LIGHT
FX-9 PEDESTRIAN POLE LIGHT
321680
Scale: 1/16” = 1’-0” L D 1-1.01
GROUND LEVEL
LIGHTING PLAN
Bollard Light
LED Strip Light
Recessed Wall Luminare
Tree Uplight
Wall-Mounted Flood
Downlight
Wall-Mounted Flood
Downlight
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
1845 SF
Club Room
2BD 2BD
2BD
1BD
1BD 1BD
1BD
1BD
1BD
669 SF
Amenity
1BD
1BD
1BD
1BD
1BD 1BD 1BD 1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD
1290 SF
Business
Center
1BD
1BD
3BD
2BD 1BD
1BD
1BD 1BD 1BD 1BD 1BD 1BD1BD
1BD
1BD 1BD
1BD
1BD
1BD
1BD 1BD
1BD
1BD
1BD 1BD
1BD
ST
ST
1BD
1BD
1BD
1BD
1BD
1BD
1BD
902 SF
2BD
2171 SF
Club Room
Private Storage
Private Storage
1BD
ST
LW LW LW LW LW LW LW
LW
LW
LW
LW
LW
LW LW LW LW LW
Private Storage
POOL
SPA
SPA
FX-1 BOLLARD LIGHT IN PLANTING
FX-2
FX-3
FX-4
FX-5
FX-6
FX-7
TREE UPLIGHT
RECESSED WALL LUMINAIRE
WALL-MOUNTED FLOOD DOWNLIGHT
LED STRIP LIGHT
STRUCTURE MOUNTED DOWNLIGHT
CITY APPROVED
PEDESTRIAN STREET LIGHTS
ITEM SYMBOL DESCRIPTION
NOTES:
INFORMATION PROVIDED IS FOR PRELIMINARY LIGHTING
CONCEPT ONLY. ALL FINAL FIXTURE SELECTIONS, QUANTITY,
AND LOCATION WILL BE PROVIDED BY ELECTRICAL ENGINEER
BASED ON PHOTOMETRIC STUDIES. BUILDING WALL-MOUNTED
LIGHTS ARE NOT SHOWN.
FX-8 FESTOON LIGHT
FX-9 PEDESTRIAN POLE LIGHT
FX-10 RECESSED LED PATHWAY LIGHT
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
321680
Scale: 1/16” = 1’-0” L D 1-1.02
PODIUM LEVEL
LIGHTING PLAN
Bollard Light
LED Strip Light
Festoon Lights Pedestrian Pole Lighting
Recessed Pathway Light
Recessed Wall Luminare
Tree Uplight
Wall-Mounted Flood
Downlight
Wall-Mounted Flood
Downlight
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025
no. date revision
revisions
consultant
project director
project captain
principal
project number
architect
client / project
project status
plot date
sheet number
sheet name
stamp
1 08/09/22 Stage I Preliminary Design
2 Stage II Progress Set
V. Li
I. Ochoa
S. Carroll
E22-014
236 North
Central Avenue
MGP XII Glendale Central,
LLC
236 N. Central Ave
Glendale, CA 91203
07/28/23
3 12/20/23 Stage II Submittal
FX-1 BOLLARD LIGHT IN PLANTING
FX-2
FX-3
FX-4
FX-5
FX-6
FX-7
TREE UPLIGHT
RECESSED WALL LUMINAIRE
WALL-MOUNTED FLOOD DOWNLIGHT
LED STRIP LIGHT
STRUCTURE MOUNTED DOWNLIGHT
CITY APPROVED
PEDESTRIAN STREET LIGHTS
LIGHTING LEGEND
ITEM SYMBOL DESCRIPTION
NOTES:
INFORMATION PROVIDED IS FOR PRELIMINARY LIGHTING
CONCEPT ONLY. ALL FINAL FIXTURE SELECTIONS, QUANTITY,
AND LOCATION WILL BE PROVIDED BY ELECTRICAL ENGINEER
BASED ON PHOTOMETRIC STUDIES. BUILDING WALL-MOUNTED
LIGHTS ARE NOT SHOWN.
FX-8 FESTOON LIGHT
FX-9 PEDESTRIAN POLE LIGHT
321680
Scale: 1/16” = 1’-0” L D 1-1.03
ROOF DECKS
6TH & 8TH LEVEL
LIGHTING PLAN
Bollard Light
Recessed Wall Luminare LED Strip Light
Tree Uplight
4 07/23/24 Stage II Update - Lighting Design 4 07/23/24 Stage II Update - Lighting Design 5 06/13/25 Stage II Update
Stage II Su
6/13/2025