1855 Verdugo Knolls Drive
Plumbing
15,785.00 2025
Replace pipes, reinstall fixtures, install 2 tankless water heaters. Plumbing repaires and upgrades in bathrooms and
Exterior Paint
29,500.00 2025
Windows
863.00 2025
Pressure wash exterior of house. Primer plus 2 coats of exterior paint. Repaint exterior windows after reglazing. Paint exterior trim.
Soil
6,700.00 2025
Geologic and Soils Engineering Exploration for Proposed Foundation Underpinning.