Cities Index.
Exhibit 3 MMRP (2026-04-30)

Glendale City Council
June 9, 2026

Document
Exhibit 3 MMRP (2026-04-30)
Meeting
June 9, 2026
Body
Glendale City Council
Original file
791 KB
Text extracted from the city's file for reading and search. Open the original on glendaleca.primegov.com. That file is the official record.

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMR
P-1
GLENDALE – LOS ANGELES GARDEN RIVER BRIDGE PROJECT
Mitigation Monitoring and Reporting Program
California Public Resources Code Section 21081.6 and Section 15097 of the California Environmental Quality Act (CEQA) Guidelines require public agencies to establish monitoring and reporting programs for projects approved by a public agency whenever approv al involves the adoption of either a mitigated negative declaration or specified environmental findings related to environmental impact reports.

This is the Mitigation Monitoring and Reporting Program (MMRP) for the Glendale -Los Angeles Garden River Bridge. The intent of the MMRP is to ensure the successful implementation of the mitigation measures identified in the Initial Study Checklist.

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-2

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
Construction, Operation, and Maintenance BMPs
BMP-1: Pre-Construction Nesting Bird Survey
Construction activities including the removal of
western sycamore trees along Zoo Drive should be
conducted outside avian nesting season pursuant
to the Migratory Bird Treaty Act. The general avian
nesting season for passerines is from February 1 st
to September 15 th but can vary based on
migratory patterns, species, weather patterns,
etc. If the nesting season cannot be avoided, a
qualified biologist shall conduct a nesting bird
survey, including suitable habitat within a 500 -
foot radius, within three days prior to any
disturbance of the site, including tr ee removal
activities. If active nests are identified, the
biologist will establish suitable buffers around the
nests, and the buffer areas shall be avoided until
the nests are no longer occupied and the juvenile
birds can survive independently from the nests
Submittal of pre -
construction nesting
bird survey report to
the City by a Qualified
Biologist.

Prior to the
issuance of
grading permits
for construction
that would start
any time
between
February 1
st and
September 15th.

Community
Development
Department

Construction
Manager/
Qualified Biologist

BMP 2: Pre-Construction Clearance Survey
Prior to the start of any ground -disturbing
activities, a qualified biologist shall conduct a pre-
construction survey of the Project site within two
hours before the start of work to determine
presence of the California legless lizard. If
individuals are d etected during the survey or
encountered during construction, the individual
shall be allowed to move out of harm’s way on its
own, or if necessary, may be relocated by a
qualified biologist to suitable upstream habitat
within the LA River.

Submittal of pre -
construction clearance
survey report for
California legless lizard
to the City by a
Qualified Biologist.

Prior to the start
of any ground-
disturbing
activities.

Community
Development
Department

Construction
Manager/
Qualified Biologist

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-3

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments

BMP-3: Bat Roost and Emergence Survey
Prior to the start of construction activities
including the removal of western sycamore trees
along Zoo Drive, a pre-construction survey for bat
roosts shall be conducted by performing a
daytime pedestrian survey to inspect potential
habitat within 100 feet of the Project’s work area
limits for indications of bat use (e.g., occupancy,
guano staining, smells, or sounds) followed by a
dusk emergence survey. The surveys shall be
conducted by a qualified bat biologist. If it is
determined habitat within the survey area is being
used, or is likely to be used as a bat roost, and may
be affected by construction activities, then
specific measures will be developed and
implemented to minimize potential impacts to the
roost. Such measures may include minimizing
construction activities near the roost during the
bat maternity season (May 1st through August
15th) or other measures developed by the
qualified biologist in coordination with the
California Department of Fish and Wildlife
(CDFW).

Submittal of Bat Roost
and Emergence Survey
report to the City by a
qualified biologist.

Prior to the
issuance of any
construction
activities.

Community
Development
Department

Construction
Manager/
Qualified Biologist

BMP-4: Workers Environmental Awareness Program
Prior to Project implementation, a Workers
Environmental Awareness Program (WEAP) shall
be prepared and presented to construction crews
regarding the potential for nesting birds and other
special-status species to occur on site during
construction activiti es. The WEAP training shall
concentrate on the proper identification of
sensitive resources while in the field, suggested
Provide the sign in /
attendance sheet to
the City demonstrating
the WEAP was
conducted by a
Qualified Biologist and
that all construction
workers attended.

Prior to the start
of construction
activities and
throughout
construction on
an as needed
basis as new
construction
Community
Development
Department

Construction
Manager/
Qualified Biologist

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-4

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
strategies in avoiding impacts to sensitive
resources, and proper reporting methods for field
crews if sensitive resources are observed during
construction activities.
workers come to
the site
BMP-5: Construction Noise
Construction noise best management practices
(BMPs) shall be implemented to protect sensitive
receptors (park users) and sound sensitive special-
status species roosting and/or nesting in the LA
River channel and adjacent habitat during
construction (includ ing excavation, pier
construction, etc.). Such BMPs shall include
requiring construction activities to be conducted
in accordance with the applicable local noise
regulations and standards and implementation of
noise reduction techniques during construction
activities, such as locating stationary construction
noise sources as far from adjacent noise-sensitive
receptors as possible. A temporary mobile noise
barriers shall be installed along the Project
boundary where construction activity is currently
active that is made of sound blanket, plywood or
other solid material capable of reducing on -site
construction noise levels by at least 9 dBA when
measured from the outside of the barrier. In
addition, all applicable equipment shall be fitted
with proper/improved mufflers which will provide
a reduction in construction noise levels by 6 dBA.
(Can be combined BMP-7 as applicable).

Install temporary
mobile noise barrier
along Project
boundary where
construction is
currently active.

Pre-construction &
construction
compliance monitoring
memo prepared by
qualified biologist to
submit to the City.

Prior to start of
construction
activities and
maintained
during
construction.

Community
Development
Department

Construction
Manager/
Qualified Biologist

BMP-6: Operational Lighting
Night lighting can disrupt the circadian rhythms of
many wildlife species; therefore, if night lighting is
required at Project entry points, low-level lighting
Use only low -level
lighting if necessary at
entry points.

Prior to start of
construction
activities and
Community
Development
Department

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-5

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
shall be utilized and all non-essential lighting shall
be eliminated. Additionally, the Project shall avoid
or limit the use of artificial lighting during the
hours of dawn and dusk as these windows of time
are when many wildlife species are most active.

Pre-construction &
construction
compliance monitoring
memo prepared by
qualified biologist to
submit to the City.
maintained
during
construction.

Construction
Manager/
Qualified Biologist
BMP-7: Access Routes and Work Area
The Project shall establish and delineate work
areas and access routes, within areas and routes
within jurisdictional features, to minimize impacts
to sensitive resources to the greatest extent
feasible.

Delineate work areas
and access routes
within jurisdictional
features.

Pre-construction
compliance monitoring
memo prepared by
qualified biologist to
submit to the City.

Prior to start of
construction
activities and
maintained
during
construction.

Community
Development
Department

Construction
Manager/
Qualified Biologist

BMP-8
Perimeter construction fencing shall be installed
at a minimum height of 6 feet around
construction areas to provide security to
pedestrians and screen views of staging and
construction areas.

Install 6-foot
perimeter
construction fencing.

Pre-construction
compliance monitoring
memo prepared by
qualified biologist to
submit to the City.

Prior to start of
construction
activities and
maintained
during
construction.

Community
Development
Department

Construction
Manager/
Qualified Biologist

BMP-9
All 75 horsepower or greater diesel -powered
equipment shall be powered by CARB -certified
Tier 4 Interim engines, except where the
Construction manager
to submit construction
equipment log to City
confirming use of or
Prior to start of
construction
activities and
maintained
Community
Development
Department

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-6

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
contractor establishes that Tier 4 Interim
equipment is not available.
attempted
procurement of Tier 4
Interim equipment
during
construction.

Construction
Manager
Cultural Resources
MM CR-1:

Archaeological Worker Environmental
Awareness Program (WEAP). Prior to the start of
construction, the Qualified Archaeologist or
archaeological monitor shall conduct training for
construction personnel regarding the appearance
of archaeological resources and the procedures
for notifying archaeological staff should
archaeological resources be discovered by
construction staff. In the event of an
archaeological resource discovery by construction
personnel, all work in the immediate vicinity of the
find shall cease and a Qualified Archaeologist shall
be contacted to evaluate the find before restarting
work in the area. If it is determined that the
archaeological resource(s) is(are) scientifically
significant, the archaeological monitor shall
complete the Archaeological Assessment.

Archaeological Assessment. If a possible
archaeological resource is uncovered during
earthwork or construction, all work shall cease
within a minimum distance of 50 feet from the find
until a Qualified Archaeologist has been retained
to evaluate the find in accordance with National
Register and California Register criteria. The
Qualified Archaeologist may adjust this avoidance
area, ensuring appropriate temporary protection
measures of the find are taken while also
Provide the sign in /
attendance sheet to
the City demonstrating
the WEAP was
conducted by a
Qualified
Archaeologist and that
all construction
workers attended.

Qualified
Archaeologist’s
assessment report
submitted to City

Prior to the start
of construction
activities and
throughout
construction on
an as needed
basis as new
construction
workers come to
the site

A report that
describes the
resources(s) and
its disposition,
as well as the
assessment
methodology,
shall be
prepared by the
Community
Development
Department

Construction
Manager/
Qualified
Archaeologist

Community
Development
Department

Construction
Manager/
Qualified
Archaeologist

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-7

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
considering ongoing construction needs in the
surrounding area. Temporary staking and
delineation of the avoidance area shall be installed
around the find in order to avoid any disturbance
from construction equipment. Ground
disturbance activities may continue unimpeded on
other portions of the site outside the specified
radius. Any potential archaeological resource or
associated materials that are uncovered shall not
be moved or collected by anyone other than an
Archaeological Monitor or Qualified Archaeologist
unless the materials have been determined to be
non-unique archaeological resources, as defined
in Public Resources Code Section 21083.1(h), by
the Qualified Archaeologist. The Qualified
Archaeologist shall determine if the resources are
unique archa eological resources as defined in
Public Resources Code Section 21083.1(g).

Consistent with Public Resources Code Section
21083.2, the handling, treatment, preservation,
and recordation of unique archaeological
resources should occur as follows:
• The find should be preserved in place or
left in an undisturbed state unless the
project would damage the resource.
• When preserving in place or leaving in an
undisturbed state is not possible,
excavation and recovery of the find for
scientific study should occur unless
testing or studies already completed
have adequately recovered the
scientifically consequential information
from and about the resource, and this
Qualified
Archaeologist
within 60 days
of assessing the
find and in
accordance with
current
professional
standards.

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-8

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
determination is documented by a
Qualified Archaeologist.

Ground disturbance activities in the area where
resource(s) were found may recommence once
the identified resources are properly assessed and
processed by a Qualified Archaeologist. A report
that describes the resources(s) and its disposition,
as well as t he assessment methodology, shall be
prepared by the Qualified Archaeologist within 60
days of assessing the find and in accordance with
current professional standards. If appropriate, the
report should also contain the Qualified
Archaeologist’s recommendat ions for the
preservation, conservation, and curation of the
resource at a suitable repository, such as the
Natural History Museum of Los Angeles County,
which shall be implemented. The Qualified
Archaeologist shall submit the report to the City of
Glendale and the SCCIC at the California State
University, Fullerton. The report shall include all
state and local requirements and shall be
formatted and completed in accordance with the
California Historic Resources Inventory System
(CHRIS) document submittals standards.

Tribal Cultural Resources
MM TCR-1: Retain a Native American Monitor listed on the Native American Heritage Commission contact list from the Kizh Nation Prior to Commencement of Ground-Disturbing Activities
A. The lead agency shall retain a Native American
Monitor from the Native American Heritage
Commission (NAHC) contact list, selected by the
Lead Agency in consultation with the consulting
tribes a qualified Kizh Nation representative to
City to retain a copy of
executed Native
American monitoring
agreement.

Prior to start of
construction
activities

Community
Development
Department

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-9

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
monitor all ground -disturbing activities . The
monitor shall be retained prior to the
commencement of any “ground -disturbing
activity” for the subject project at all project
locations (i.e., both on -site and any off -site
locations that are included in the project
description/definition and/or req uired in
connection with the project, such as public
improvement work). “Ground-disturbing activity”
shall include, but is not limited to, clearing,
demolition, pavement removal, potholing,
auguring, grubbing, tree removal, stripping
topsoil, boring, gradi ng, excavating, digging,
drilling, tunneling, blasting, quarrying, leveling,
driving posts, and trenching or similar activity, and
archaeological work.

B. A copy of the executed monitoring agreement
shall be retained by the lead agency prior to
commencement of any ground-disturbing activity,
or the issuance of any permit necessary to
commence a ground-disturbing activity.

C. The monitor will complete daily monitoring logs
that will provide descriptions of the relevant
ground-disturbing activities, the type of
construction activities performed, locations of
ground-disturbing activities, soil types, cultural -
related materials, and any other facts, conditions,
materials, or discoveries of significance to the
Native American
monitoring logs
Maintain
throughout
construction
duration
Construction
Manager/
Native American
Monitor
EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-10

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
consulting tribes. Monitor logs will identify and
describe any discovered TCRs, including but not
limited to, Native American cultural and historical
artifacts, remains, places of significance, etc.,
(collectively, tribal cultural resources, or “TCR”),
as well as any discovered Native American
(ancestral) human remains and burial goods.

Copies of monitor logs will be provided to the lead
agency and maintained as part of the project
record upon written request to the consulting
tribes, subject to applicable confidentiality
requirements under CEQA and the California
Public Resources Code.

D. On -site tribal monitoring shall conclude upon
the latter of the following: (1) written
confirmation to the Kizh Nation and other
consulting tribes who have requested separate
site monitoring, from a designated point of
contact for the lead agency that all ground-
disturbing activities and phases that may involve
ground-disturbing activities on the project site or
in connection with the project are complete; or (2)
a determination by the Lead Agency, informed by
consultation with the Kizh Nation and other the
consulting tribes, as applicable, and written
notification to the Kizh Nation and other
consulting tribes , as applicable, that no future,
planned construction activity and/or
EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-11

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
development/construction phase at the project
site possesses the potential to impact TCRs.

MM TCR-2: Unanticipated Discovery of Tribal Cultural Resource Objects (Non-Funerary/Non-Ceremonial) A. Upon discovery of any TCRs, all construction
activities in the immediate vicinity of the
discovery (within a 60-foot buffer) shall cease and
shall not resume until the discovered TCR has
been fully assessed by the tribal monitor and/or a
qualified archaeol ogist meeting Secretary of
Interior standards (retained by lead agency).

Work on the portions of the project site outside of
the buffered area may continue during this
assessment period. The TCR shall be retained by
the archaeologist until the end of th e project
whereby the lead agency shall, in good faith,
consult with the Kizh Nation and other consulting
tribes, as applicable, that requested consultation
for the project on the disposition and treatment
(which may include reinternment to an area
where there will be no future ground
disturbances) of any TCR(s) encountered during
all ground disturbing activities.

Submittal of
Monitoring Report to
City
Throughout
construction
duration
Community
Development
Department

Construction
Manager/
Native American
Monitor and Qualified
Archaeologist

MM TCR-3: Unanticipated Discovery of Human Remains and Associated Funerary or Ceremonial Objects A. Native American human remains are defined in
California Public Resources Code (PRC) Section
5097.98 (d)(1) as an inhumation or cremation, and
in any state of decomposition or skeletal
completeness. Funerary objects, called associated
Monitoring, data
recovery, determining
the significance of the
finds, and
implementing
Throughout
construction
duration
Community
Development
Department

County Coroner/

EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-12

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
grave goods in PRC Section 5097.98, are also to be
treated according to this statute.

B. Human remains and grave/burial goods shall be
treated alike per California Public Resources Code
section 5097.98(d)(1) and (2).

C. If Native American human remains and/or
grave goods are discovered or recognized on the
project site, then PRC Section 5097.9 as well as
California Health and Safety Code Section 7050.5
shall be followed. If human remains or funerary
objects are encount ered, work within the
immediate vicinity (within 100 -foot buffer of the
find) shall cease and the County Coroner shall be
contacted without delay. No photographs may be
taken. If the County Coroner determines that the
remains are Native American, the Coron er will
contact the California Native American Heritage
Commission (NAHC), in accordance with
subdivision (c) of Section 7050.5 of the California
Health and Safety Code. If the relevant agencies
conclude that avoidance of the site is not feasible,
an alter native plan must be developed that
outlines specific steps and a timeline for resuming
construction activities. Monitoring, data recovery,
determining the significance of the finds, and
implementing avoidance measures (if necessary)
avoidance measures (if
necessary) must be
carried out promptly,
by the City

Native American
Monitor and Qualified
Archaeologist
EXHIBIT 3

J ANUARY 2026

GLENDALE-LOS ANGELES GARDEN RIVER BRIDGE
MMRP-13

Construction, Operation, and Maintenance Best
Management Practices (BMPs) and
Mitigation Measures
Action Required/
Monitoring Method
Implementation
Timing
Responsible
Monitoring
Party/Agency
Compliance Verification
Initial Date Comments
must be carried out promptly, at the expense of
the lead agency.

D. Preservation in place (avoidance with 100 foot
boundary/buffer) is the preferred manner of
treatment for discovered human remains and/or
burial goods.

E. Any discovery of human remains/burial goods
shall be kept confidential to prevent further
disturbance.

EXHIBIT 3