Approval of Plans and Specifications, and Authorization to Advertise for Bids for the 2022-2023 Pavement Rehabilitation Project

Goleta City Council
June 7, 2022

Document
Approval of Plans and Specifications, and Authorization to Advertise for Bids for the 2022-2023 Pavement Rehabilitation Project
Meeting
June 7, 2022
Body
Goleta City Council
Pages
5
Original file
17.0 MB
Text extracted from the city's file for reading and search. Open the original on goleta.legistar1.com. That file is the official record.

Agenda Item B.8

CPMS CONSENT CALENDAR
Meeting Date: June 7, 2022
____________________________________________________________

TO: Mayor and Councilmembers

FROM: Charles W. Ebeling, Public Works Director

CONTACT: Debbie Talarico, Project Manager

SUBJECT: Approval of Plans and Specifications , and Authorization to Advertise for Bids for the 2022-2023 Pavement Rehabilitation Project

RECOMMENDATIONS:

A. Approve Plans and Specifications for the 2022-2023 Pavement Rehabilitation Project; and

B. Authorize staff to advertise a notice inviting bids for the 202 2-2023 Pavement Rehabilitation Project.

BACKGROUND:

The City of Goleta owns approximately 85 centerline miles of roadways, which consist of paved surfaces primarily for vehicular traffic including cars, bicycles, buses and trucks.

Pedestrians also use portions of the paved surfaces at intersections and whe n traveling along roadways without sidewalks. Roadways also consist of medians, curb, gutter and sidewalk, landscaped areas and traffic control devices such as traffic signs and signals.

The City of Goleta’s paved roadway surface, typically asphalt concr ete, has a replacement value of $221 million, making just the pavement itself the most valuable asset the City owns. To maintain this asset, the City uses a Pavement Management Program (PMP). The PMP consists of tracking the condition of the pavement and based on the condition, developing periodic pavement maintenance activities and projects.

Pavement maintenance ranges from pothole repair and crack sealing to slurry seals, overlays and reconstructions.

The PMP is also a critical planning tool to assist staff in establishing a list of priority roadways to be included in the City’s annual pavement rehabilitation projects. In addition to the PMP recommendations, the paving priority list is developed based o n public input and staff’s experience and understanding of the roadway network. In November 202 1, Public Works staff presented a proposed 2-year paving priority list to City Council. At that 1 Meeting Date: June 7, 2022

Page 2 of 5 ends

meeting City Council approved the 2-year paving priority list and directed staff to proceed with design for the 2022-2023 Pavement Rehabilitation Project based on the paving priority list.

DISCUSSION:

The City constructs a n Annual Pavement Rehabilitation Project as part of the PMP and in order to effectively maintain the City’s entire roadway network. Public Works, in collaboration with Pavement Engineering, Inc. (PEI), have completed design of the 2022- 2023 Pavement Rehabilitation project plans and specifications. The Goleta Municipal Code (GMC), Section 3.05.170(C) a nd Section 3.05.2 10(A), requires City Council authorization prior to publication of a notice inviting bids for construction projects in excess of $ 200,000. The project team have completed design for the project and are prepared to advertise for constructi on bids for the subject project upon City Council’s approval and authorization. A notice to invite construction bids will be published in the public newspaper and posted on the City’s website. Public Works anticipates returning to City Council with a proposed construction contract for award in Summer 2022.

The plans and specifications include priority roadway segments for the Base Bid and also additional roadway segments included as Bid Additive Alternates. The Base Bid roadway segments must be awarded; however, the Bid Alternate roadway segments may be added to the construction contract in any order based on bid amounts received and available budget. The entire Base Bid and Bid Alternates cost estimates are significantly higher than the available budget, however they were included to provide the City flexibility in selecting Bid Alternate roadway segments to include at the Council’s discretion. Public Works will provide a recommendation for Base Bid and Bid Alternates for City Council’s consideration when City staff returns to City Council for award of the construction contract. The roadway segments and estimated construction costs for the Base Bid and Bid Alternates are shown in the following table:

2022-2023 Construction Cost Estimates

Alternate Location Estimated
Cost
Base Bid Cannon Green Neighborhood, consisting of Cannon Green Drive (Phelps Road to Hollister Avenue), Chapman Place
(Cannon Green Drive to End), Davenport Road (West End
Cul-De-Sac to East End Cul-De-Sac), Elmhurst Place
(West End Cul-De-Sac to East End Cul-De-Sac), Freeman
Place (West End Cul-De-Sac to East End Cul-De-Sac),
Greensboro Street (East End Cul-De-Sac to Cannon
Green Drive), and Hillsboro Street (Cannon Green Drive to East End Cul-De-Sac), Hillsboro Way (Hillsboro Street to Cul-De-Sac), Lowell Way (Hollister Avenue to Lowell Way), Lowell Way (West End Cul-De-Sac to East End Cul-De-
Sac
$1,300,000
-Los Carneros Way (Calle Real to Cathedral Oaks Road)
2 Meeting Date: June 7, 2022

Page 3 of 5 ends

-Storke Road (Bollay Drive to Hollister Avenue)
Alternate A Covington neighborhood consisting of Camino Caseta, Caseta Way, Camino Laguna Vista, Camino Talavera,
Camino Venturoso, Camino Viviente, Caroldale Lane,
Covington Way
$ 1,300,000
Alternate B Padova Drive (Salisbury Avenue to San Rossano Drive) $ 380,000 Alternate C Padova Drive (Alpine Drive to Alameda Avenue) $ 316,000 Alternate D Armstrong Road (Reed Court to Mills Way) $ 343,000 Alternate E Hollister Avenue (West End to Cathedral Oaks Blvd) $ 250,000 Alternate F Newport Drive, Palos Verdes Drive $310,000
Alternate G Phelps Road (Pacific Oaks Road to Storke Road) $ 750,000 Alternate H Phelps Road (Storke Road to East End) $ 282,000 Alternate I Cathedral Oaks Blvd (Evergreen Drive to Alameda Avenue)
$ 1,350,000
Alternate J Tree Root Repairs – Various Streets $ 17,000 Alternate K Storke Road (Hollister Avenue to US 101) $272,000 TOTAL $ 6,870,000

The plans and specifications for the project consist of the plan sheets, bid documents, the City general provisions, and project special provisions. The specifications also incorporate by reference the City adopted engineering standards, Greenbook Standard Specification and Standard Plans for Public Works Construction (current edition including applicable amendments), Caltrans Standard Plans and Specifications (current edition), Occupational Safety and Health Administration (OSHA) regulations, the California Manual of Uniform Traffic Control Devices (CMUTCD), and the Caltrans Construction Manual. The full set of plans and contract specifications are available on the City website as part of this City Council agenda item. Public Works recommends that the City Council approve these plans and specifications and authorize staff to advertise for construction bids for the project.

FISCAL IMPACTS:

The following table shows the total estimated project costs with the construction costs (for the base bid) shown based on the original project budget.

2022-2023 Base Bid Total Project Cost Estimates

Project Components Estimated
Costs

Funding Source Funding
Amounts
Staff $ 80,822 General Fund (101) $ 730,000 Project Management
(Consultant) $ 133,000 Gas Tax (201) $ 745,600 Design (Consultant) $600,000 RMRA (203) $ 619,000 Construction $ 1,300,000 Measure A (205) $ 300,000 3 Meeting Date: June 7, 2022

Page 4 of 5 ends

Construction
Contingency/CCO $ 280,000 LSTP (306) $ 249,222 CM (Consultant) $ 252,000
Total: $ 2,643,822 Total: $ 2,643,822(1)

(1) The $2,643,882 reflects the original budget programmed and adopted in FY 21/22. At this time the current FY 21/22 available budget is estimated at $2,883,385.

Project Funding

There is currently approximately $2.8 million of construction funds available for the 2022- 2023 Project in General Fund, Gas Tax, SB1 Road Maintenance and Rehabilitation Account (RMRA), Local Surface Transportation Program (LSTP), and Measure A funding.

However, when including the FY 22/23 proposed budget of $2.5 million and street reserves of $2.2 million, $7.6 million may be available. Based on the current budget the City would only be able to award the Base Bid roadway segments and additional funding would be necessary to award any of the Bid Alternates roadway segments. If including the FY 22/23 proposed budget amounts and street reserves, funding may be available to support the bid alternates. Following the receipt of bids, Public Works may request additional funding appropriation at the time the contract is recommended for award.

Table 1 below summarizes the current FY 21/22 project budget amounts and funding source accounts and Table 2 below summarizes the current FY 21/22 project budget amounts plus the FY 22/23 proposed budgets and street reserves and funding source accounts:

Table 1 – Current FY 21/22 Budget

Project: 2022-2023 Pavement Rehabilitation Project
Account Fund Type FY 21/22
Adopted Budget
Activity /
Encumbrances
Total Available
Budget
101-50-5800-51073 General Fund $ 4,900,017 $ 3,919,000 $ 981,017 201-50-5800-51073 Gas Tax $ 2,929,227 $ 2,176,070 $ 753,157 203-50-5800-51073 RMRA $ 1,717,000 $ 1,098,000 $ 619,000 205-50-5800-51073 Measure A $ 840,180 $ 559,190 $ 280,990 306-50-5800-51062 LSTP $ 483,992 $ 234,770 $ 249,222 Total $ 10,870,415 $ 7,987,030 $ 2,883,385
4 Meeting Date: June 7, 2022

Page 5 of 5 ends

Table 2 - Current FY 21/22 Budget, plus the FY 22/23 Proposed budget and Street Reserves

ALTERNATIVES:

The City Council may elect to not approve the plans and specifications and not authorize staff to advertise for construction bids for th is p roject. Doing so would delay the construction of the project.

Reviewed By: Legal Review By: Approved By:

___________________ ___________________ _________________ Kristine Schmidt Megan Garibaldi Michelle Greene
Assistant City Manager City Attorney City Manager

ATTACHMENTS:

1. 2022-2023 Pavement Rehabilitation Project – Plans (Available Online Only)

2. 2022-2023 Pavement Rehabilitation Project – Specs (Available Online Only)

Project: 2022-2023 Pavement Rehabilitation Project
Account Fund Type
FY 21/22
Available
Budget
FY 22/23
Proposed
Budget
FY 22/23
Street
Reserves
Total Available
Budget
101-50-5800-51073 General Fund $ 981,017 $ 730,000 $ 2,200,000 $ 3,911,017 201-50-5800-51073 Gas Tax $ 753,157 $ 745,600 $ 1,498,757 203-50-5800-51073 RMRA $ 619,000 $ 619,000 $ 1,238,000 205-50-5800-51073 Measure A $ 280,990 $ 300,000 $ 580,990 306-50-5800-51062 LSTP $ 249,222 $ 119,117 $ 368,339 Total $ 2,883,385 $2,513,717 $ 2,200,000 $ 7,597,103
5 ATTACHMENT 1

2022-2023 Pavement Rehabilitation Project - Plans

6 PACIFIC OCEAN

TITLE SHEET
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08_TITLE SHEET.DWG Plot Date: 4/14/2022 11:53 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER
CH
APRIL 2022
190192-08
1 of 39
Know what'sbelow.Callbefore you dig.

NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING ALL STRIPING WITHIN LIMITS OF WORK. STRIPING IS TO MATCH EXISTING UNLESS OTHERWISE SHOWN ON PLANS OR DIRECTED BY THE CITY. CONTRACTOR SHALL TIE DOWN LOCATION OF ALL STRIPING PRIOR TO REMOVAL.

2. ALL TRAFFIC STRIPING SHOWN ON THESE DRAWING IS PRE-EXISTING.

NEW STRIPING IS SUBJECT TO CHANGE. PLEASE REFER TO SHEETS 34 TO 39 FOR STRIPING PLANS.

3. NOT ALL UTILITIES ARE SHOWN ON PLANS. CONTRACTOR SHALL TIE DOWN EXISTING UTILITIES PRIOR TO OVERLAY OR REMOVE AND REPLACE WORK.

4. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (811) AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF OF

CONSTRUCTION TO ALLOW UTILITY OWNER TO MARK THE LOCATION OF

THEIR RESPECTIVE UNDERGROUND FACILITIES/UTILITIES, PUBLIC OR PRIVATE, SHOWN OR NOT ON THESE PLANS.

5. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS TO COMPLETE WORK.

6. FOR DIGOUT AREAS OR AREAS TO BE REMOVED & REPLACED, THE

CONTRACTOR SHALL ONLY REMOVE MATERIAL QUANTITIES THAT CAN BE REPLACED DURING THE SAME WORK DAY.

7. THE CONTRACTOR SHALL CONTACT THE ENGINEER AT LEAST TWO (2)

WORKING DAYS PRIOR TO THE COMMENCEMENT OF PAVING TO ALLOW

THE ENGINEER TO MARK THE LIMITS OF PAVING AND LOCATIONS OF DIGOUTS.

8. CONTRACTOR SHALL DEVELOP AN AC PAVING PLACEMENT PLAN THAT

WILL ENSURE THAT NO LONGITUDINAL JOINTS REMAIN UNFINISHED IN THE

SAME DIRECTION BETWEEN WORK SHIFTS DURING FINISH COURSE PLACEMENT.

9. CONTRACTOR SHALL REMOVE ANY EXISTING ASPHALT MATERIAL FROM GUTTER PAN WITHIN PROJECT LIMITS; CONTRACTOR SHALL PROTECT EXISTING PCC FACILITIES.

10.CONTRACTOR SHALL PROTECT VERTICAL EDGES ON LIMITS OF WORK,

ANY BROKEN EDGES SHALL BE RE-CUT TO PROVIDE CLEAN STRAIGHT LINE.

11.CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION WASTE IN A LEGAL MANNER.

CONSTRUCTION DRAWINGS

CITY OF GOLETA
2022/2023 PAVEMENT REHABILITATION PROJECT
FOR

VARIOUS STREETS

SHEET INDEX
SHEET

NUMBERSHEET DESCRIPTIONBASE BID /

ALTERNATE
1TITLE SHEET--
2CANNON GREEN DRIVEBASE BID
3CHAPMAN PLACE AND LOWELL WAYBASE BID
4DAVENPORT ROADBASE BID
5ELMHURST PLACEBASE BID
6FREEMAN PLACE & GREENSBORO STREETBASE BID
7HILLSBORO STREETBASE BID
8-9LOS CARNEROS WAY
(CALLE REAL TO CATHEDRAL OAKS ROAD)BASE BID
10STORKE ROAD
(BOLLAY DRIVE TO HOLLISTER AVENUE)BASE BID
11CAMINO CASETA & CASETA WAYBID ALTERNATE A
12CAMINO LAGUNA VISTABID ALTERNATE A
13CAMINO TALAVERABID ALTERNATE A
14CAMINO VENTUROSOBID ALTERNATE A
15CAMINO VENTUROSOBID ALTERNATE A
16CAMINO VIVIENTEBID ALTERNATE A
17CAROLDALE LANEBID ALTERNATE A
18-19COVINGTON WAYBID ALTERNATE A
20PADOVA DRIVE
(SALISBURY AVENUE TO SAN ROSSANO DRIVE)BID ALTERNATE B
21PADOVA DRIVE
(ALPINE DRIVE TO ALAMEDA AVENUE)BID ALTERNATE C
22ARMSTRONG ROAD
(REED COURT TO MILLS WAY)BID ALTERNATE D
23 - 25HOLLISTER AVENUE
(WEST END TO CATHEDRAL OAKS BLVD)BID ALTERNATE E
26 - 27NEWPORT DRIVE & PALOS VERDES DRIVEBID ALTERNATE F 28PHELPS ROAD
(PACIFIC OAKS ROAD TO STORKE ROAD)BID ALTERNATE G
29PHELPS ROAD
(STORKE ROAD TO EAST END)BID ALTERNATE H
30CATHEDRAL OAKS BLVD
(EVERGREEN DRIVE TO ALAMEDA AVENUE)BID ALTERNATE I
31TREE ROOT REPAIRS - VARIOUS STREETSBID ALTERNATE J
32STORKE ROAD
(HOLLISTER AVENUE TO 101)BID ALTERNATE K
33CURB RAMP ENLARGEMENT - STORKE ROAD
34-35STRIPING PLANS - COVINGTON WAY
36-37STRIPING PLANS - PHELPS ROAD
38STRIPING PLANS - CATHEDRAL OAKS ROAD
39STRIPING PLANS - STORKE ROAD

LOCATION PLAN

NOT TO SCALE
SHEET 1-7 CANNON GREEN
NEIGHBORHOOD217
SHEET 8-9 LOS

CANEROS RD
SHEET 10

STORKE RD
SHEET 11-19

COVINGTON

NEIGHBOORHOOD
SHEET 20

PADOVA DR
SHEET 21

PADOVA DR
SHEET 22

ARMSTRONG RD
SHEET 23-25

HOLLISTER AVE
SHEET 26-27

NEWPORT DR

NEIGHBORHOOD
SHEET 28

PHELPS RD
SHEET 29

PHELPS RD
SHEET 30

CATHEDRAL OAKS RD
SHEET 34

STORKE RD
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 4/18/2022
7 BRPM
SS
SS
BRPM
SS
BRPM
R&R 4" AC
(~6'x8')
WLL
WLL
WLL
SCO

PHELPS ROAD

HILLSBORO STREET

GREENSBORO STREET
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00

SS BRPM
SS
BRPM
SS
R&R 4" AC
(~6'x11')
R&R 4" AC
(~6'x22')
R&R 4" AC
(~6'x6')
R&R 4" AC
(~6'x42')
R&R 4" AC
(~12'x6')
R&R 4" AC
(~6'x10')
R&R 4" AC
(~6'x6')
WLL
WLL
WLL
WLL
WLL
WLL
WLL
WLL
SS
SS
R
BRPM
R&R 4" AC
(~6'x13')
R&R 4" AC
(~6'x18')
R&R 4" AC
(~6'x6')
R&R 4" AC
(~6'x14')

FREEMAN PLACE

ELMHURST PLACE

CHAPMAN PLACE

HOLLISTER AVENUE

DAVENPORT ROAD
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
30+21

HOLLISTER AVE

DAVENPORT RD

ELMHURST PLFREEMAN PLGREENSBORO ST

LOWELL WAYHILLSBORO ST

CHAPMAN PL
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 1.DWG Plot Date: 4/14/2022 11:53 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CANNON GREEN DRIVE
PKM
APRIL 2022
190192-08
1" = 40'
2 of 39

MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT
SEE SHEET 7 FOR WORK
ON HILLSBORO STREETSEE SHEET 6 FOR WORK

ON GREENSBORO STREET
SEE SHEET 6 FOR WORK

ON FREEMAN STREET
SEE SHEET 5 FOR WORK

ON ELMHURST PLACE
SEE SHEET 4 FOR WORK

ON DAVENPORT ROAD
SEE SHEET 3 FOR WORK

ON CHAPMAN PLACE

KEY MAP
NTS
LEGEND

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)WLL
BRPM

SANITARY SEWER MANHOLESS
W12" WHITE CROSSWALK LINE (THERMO)

REMOVE AND REPLACER&R

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

BASE BID

CANNON GREEN DRIVE

CANNON GREEN DRIVE

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 8 HOLLISTER AVE

DAVENPORT RD

ELMHURST PLFREEMAN PLGREENSBORO ST

LOWELL WAYHILLSBORO ST

CHAPMAN PL
WLL
R&R 4" AC
(~32'x6')
R&R 4" AC
(~6'x14')
R&R 4" AC
(~6'x10')

CANNON GREEN DRIVE

LOWELL WAY

HOLLISTER AVENUE

SCOSSBRPM
BRPM
SS
R&R 4" AC
(~6'x6')
R&R 4" AC
(~6'x6')
R&R 4" AC
(~30'x30')
WLL
C1C2
10+00
11+00
12+00
13+00
14+00
15+00
16+00
16+79
10+0011+0011+10
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
NTS
TYPICAL SECTION NO. 1
3"3"
6'
KEYCUT A1
6'
KEYCUT A1

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
2" 2"
2" SURFACE COURSE
ARHM (GG-D PG 64-10)
1/2" LEVELING COURSE
AC (D2 PG 64-10)R&R (SEE PLAN

FOR LOCATION
& DEPTH)
17'
KEYCUT - TYPE A1

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B1

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
2"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
2" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 1.DWG Plot Date: 4/14/2022 11:53 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CHAPMAN PLACE & LOWELL WAY
PKM
APRIL 2022
190192-08
1" = 40'
3 of 39
SEE SHEET 2 FOR WORK

ON CANNON GREEN DRIVE

KEY MAP
NTS

BORING LOCATIONXX
LEGEND
TYPE A1 KEYCUT

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)
WLL
BRPM

SANITARY SEWER MANHOLESS
TYPE B1 KEYCUT
BRPM
SS
SEWER CLEANOUT (EX.)SCO
W12" WHITE CROSSWALK LINE (THERMO)

REMOVE AND REPLACER&R

CRACK FILL & SLURRY SEAL (TYPE II)

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C13-1/2"-N
C23-1/2"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

CRACK FILL & SLURRY SEAL (TYPE II)
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
KEYCUT B1 (TYP.)
2 1
34 C
XX
C

CURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CURB RAMP CONFLICT (SEE APPENDIX A)

BASE BID

LOWELL WAY

CHAPMAN PLACE
TYPICAL SECTION NO. 1

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 9 HOLLISTER AVE

DAVENPORT RD

ELMHURST PLFREEMAN PLGREENSBORO ST

LOWELL WAYHILLSBORO ST

CHAPMAN PL
WLL
WLL
SS
BRPM

SSBRPMSS
R&R 4" AC
(~6'x12')
R&R 4" AC
(~6'x12')
R&R 4" AC
(~6'x12')
10+00
11+00
12+00
13+00
14+00
15+00
16+00
10+00
11+00
12+00
13+00
13+52
SS
R&R 4" AC
(~6'x12')
16+0017+0018+0019+0019+49
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 1.DWG Plot Date: 4/14/2022 11:53 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CUL-DE-SAC TO EAST END
PKM
APRIL 2022
190192-08
1" = 40'
4 of 39

MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT
SEE SHEET 2 FOR WORK

ON CANNON GREEN DRIVE

KEY MAP
NTS
LEGEND

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)WLL
BRPM

SANITARY SEWER MANHOLESS

REMOVE AND REPLACER&R

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

BASE BID

DAVENPORT ROAD

DAVENPORT ROAD

CANNON GREEN DRIVE

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 10 HOLLISTER AVE

DAVENPORT RD

ELMHURST PLFREEMAN PLGREENSBORO ST

LOWELL WAYHILLSBORO ST

CHAPMAN PL
WLL
WLL
R&R 4" AC
(~8'x13')
SS
SS
R&R 4" AC
(~6'x8')

R&R PCC CURB
AC (~8 LF)
R
R
BRPM
10+00
11+00
12+00
13+00
10+00
11+00
12+00
13+00
14+00
14+41

SSSSBRPM
R&R 4" AC
(~6'x6')
R&R 4" AC
(~6'x16')
R&R 4" AC
(~6'x8')
14+0015+00
16+00
17+00
17+82
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 1.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

ELMHURST PLACE
PKM
APRIL 2022
190192-08
1" = 40'
5 of 39

MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT
SEE SHEET 2 FOR WORK

ON CANNON GREEN DRIVE

KEY MAP
NTS

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
12" WHITE LIMIT LINE (THERMO)WLL
BRPM

SANITARY SEWER MANHOLESS

REMOVE & REPLACE PCC CURB & GUTTER

RPRUNE & REMOVE TREE ROOTS

REMOVE AND REPLACER&R

PORTLAND CEMENT CONCRETEPCC

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)
LEGEND

CRACK FILL & SLURRY SEAL (TYPE II)

BASE BID

ELMHURST PLACE

ELMHURST PLACE

CANNON GREEN DRIVE

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 11 HOLLISTER AVE

DAVENPORT RD

ELMHURST PLFREEMAN PLGREENSBORO ST

LOWELL WAYHILLSBORO ST

CHAPMAN PL

CANNON GREEN DRIVE
R&R 4" AC
(~6'x8')
WLL
WLL
R&R 4" AC
(~16'x6')
R&R 4" AC
(~7'X6')
R&R 4" AC
(~6'X13')
R&R 4" AC
(~6'X8')
R&R 4" AC
(~6'X6')
R&R 4" AC
(~6'X10')
R&R 4" AC
(~8'X8')
10+00
11+00
12+00
13+00
14+00
15+00
15+89
10+00
11+00
12+00
13+00
14+00
15+0015+04

CANNON GREEN DRIVE
WLLSCO
SS
BRPM
10+00
11+00
12+00
13+00
14+00
15+00
16+0016+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 1.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

FREEMAN PLACE & GREENSBORO STREET
PKM
APRIL 2022
190192-08
1" = 40'
6 of 39 KEY MAP
NTS
SEE SHEET 2 FOR WORK

ON CANNON GREEN DRIVE
SEE SHEET 2 FOR WORK

ON CANNON GREEN DRIVE
LEGEND

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
12" WHITE LIMIT LINE (THERMO)WLL
BRPM

SANITARY SEWER MANHOLESS

REMOVE AND REPLACER&R
SS
SS
BRPM
SS
SS
SEWER CLEANOUT (EX.)SCO

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

BASE BID

FREEMAN PLACE

GREENSBORO STREET

CANNON GREEN DRIVE

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 12 HOLLISTER AVE

DAVENPORT RD

ELMHURST PLFREEMAN PLGREENSBORO ST

LOWELL WAYHILLSBORO ST

CHAPMAN PL

CANNON GREEN DRIVE

HILLSBORO WAY
WLL
BRPM
SS
SS
SS
R&R 4" AC
(~6'x32')
R&R 4" AC
(~6'x36')
R&R 4" AC
(~6'x10')
R&R 4" AC
(~6'x16')
R&R 4" AC
(~6'x34')
R&R 4" AC
(~6'x10')
10+00
11+00
12+00
13+00
14+00
15+00
16+00
16+69
10+00
11+00 12+00
12+32
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 1.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

HILLSBORO STREET & HILLSBORO WAY
PKM
APRIL 2022
190192-08
1" = 40'
7 of 39
SEE SHEET 2 FOR WORK

ON CANNON GREEN DRIVE

KEY MAP
NTS
LEGEND

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
12" WHITE LIMIT LINE (THERMO)WLL
BRPM

SANITARY SEWER MANHOLESS

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

CRACK FILL & SLURRY SEAL (TYPE II)

BASE BID

HILLSBORO STREET

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 13 CALLE REAL
ENTRY TO FIRE STATION 14
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
NTS
TYPICAL SECTION NO. 2
COLD PLANE 2-1/2"

EXISTING SECTION
CONSTRUCTION SEQUENCE:

1.COLD PLANE 2-1/2" EXISTING SECTION

2.PLACE 1/2" AC (C2 PG 64-10) BASE COURSE.

3.PLACE 2" ARHM (GG-D PG 64-16) SURFACE COURSE.

MEDIAN
(VARIES)
2" ARHM

SURFACE COURSE
PLACE 1/2" AC
2-1/2"
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 2 & 3.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

LOS CARNEROS ROAD (CALLE REAL TO CATHEDRAL OAKS ROAD)
PKM
APRIL 2022
190192-08
1" = 40'
8 of 39

MATCHLINE - SEE SHEET
9 LEGEND
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)
WLL
W12" WHITE CROSSWALK LINE (THERMO)

LOS CARNEROS ROAD
12" YELLOW CROSSWALK LINE (THERMO)Y
Y
Y

COLD PLANE & REPLACE AC PAVEMENT

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
BRPM
BRPM

WATER VALVE
TYPICAL SECTION NO. 2

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C3 14-1/2"-Y
C610"-Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

C3
C6

BORING LOCATIONXX
139
140

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

BASE BID
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 14 CATHEDRAL OAKS ROAD

COVINGTON WAY
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
31+47
NTS
TYPICAL SECTION NO. 2
COLD PLANE 2-1/2"

EXISTING SECTION
CONSTRUCTION SEQUENCE:

1.COLD PLANE 2-1/2" EXISTING SECTION

2.PLACE 1/2" AC (C2 PG 64-10) BASE COURSE.

3.PLACE 2" ARHM (GG-D PG 64-16) SURFACE COURSE.

MEDIAN
(VARIES)
2" ARHM

SURFACE COURSE
PLACE 1/2" AC
2-1/2"
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 2 & 3.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

LOS CARNEROS ROAD (CALLE REAL TO CATHEDRAL OAKS ROAD)
PKM
APRIL 2022
190192-08
1" = 40'
9 of 39
MATCHLINE - SEE SHEET 8

LOS CARNEROS ROAD
LEGEND
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)
WLL
WLL
TYPICAL SECTION NO. 2

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C49"-Y
C5 10-1/2"-Y
C7 10-1/2"-Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

C4C5
C7

BORING LOCATIONXX
3736

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

BASE BID

COLD PLANE & REPLACE AC PAVEMENT
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 15 BOLLAY DRIVE

HOLLISTER AVENUE
C8
C9
C11
C10
C12
C13
GTE
SD
SD
SD
SD
GTE
T
BRPM
WLL
SOUTH
101

STORKE PLAZA
R&R 9" AC
(~6' X 261')R&R 9" AC
(~6' X 22')R&R 9" AC
(~6' X 10')
R&R 9" AC
(~6' X 6)R&R 9" AC
(~6' X 67')
R&R 9" AC
(~6' X 121') R&R 9" AC
(~6' X 205')
R&R 9" AC
(~6' X 75')
TYPICAL SECTION NO. 3
128C127
C
124123
126
125
120
122
121C
C
C
C
C
C
C
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
17+63
NTS
TYPICAL SECTION NO. 3
COLD PLANE 2-3/4"

EXISTING SECTION
CONSTRUCTION SEQUENCE:

1.COLD PLANE 2-3/4" EXISTING SECTION

2.PLACE 3/4" AC (C2 PG 64-10) BASE COURSE.

3.PLACE 2" ARHM (GG-D PG 64-16) SURFACE COURSE.

MEDIAN
(VARIES)
2" ARHM

SURFACE COURSE
PLACE 3/4" AC

BASE COURSE
2-3/4"

R&R (SEE PLAN

FOR LOCATION
& DEPTH)
NTS
REMOVE & REPLACE 9" AC
REMOVE 9"

PAVEMENT
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 6" AC (C2 PG 64-10) BASE COURSE
& 3" AC (C2 PG 64-10) SURFACE COURSE
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 2 & 3.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

STORKE ROAD (BOLLAY DRIVE TO HOLLISTER AVENUE)
PKM
APRIL 2022
190192-08
1" = 40'
10 of 39

STORKE ROAD

WATER VALVE

SANITARY SEWER MANHOLESS
EX. WIRELESS TRAFFIC SENSOR
LEGEND

BORING LOCATIONXX

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C89"12"-Y
C9 10-1/2"2"71Y
C1012"--Y
C11 7-1/4"13"-Y
C1212"--Y
C1311"--Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

XX
C

CURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CURB RAMP CONFLICT (SEE APPENDIX A)

BASE BID

REMOVE & REPLACE TRAFFIC LOOPS

COLD PLANE & REPLACE AC PAVEMENT
SEE SHEET 33 FOR CURB

RAMP ENLARGEMENT

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
CALTRANS STRIPING DETAIL "XX"
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 16 CASETA WAY
(~20 LF)
CR
41 40
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
20+51
10+00
11+00
11+91
32+00
33+00
34+00
14+00
15+00
16+0011+00
11+24

CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
15'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAMINO CASETA & CASETA WAY
PKM
APRIL 2022
190192-08
1" = 40'
11 of 39 KEY MAP
NTS
SEE SHEET 18 FOR WORK

ON COVINGTON WAY
SEE SHEET 15 FOR WORK

ON CAMINO VENTUROSO
LEGEND

REMOVE & REPLACE (SEE PLAN FOR DEPTH)

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS
SEWER CLEANOUT (EX.)SCO

R&R CURB & GUTTERC
TYPE A2 KEYCUT
TYPE B2 KEYCUT
SCO
SS
SSBRPM
SS
R
(~8 LF)
CR
R&R 4" AC
(~6'X22')
R
(~20 LF)
CR
R&R 4" AC
(~16'X12')R&R 4" AC
(~6'X26')
R&R 4" AC
(~6'X10')

REMOVE & REPLACER&R

CRACK SEAL & SLURRY SEAL (TYPE II)

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C143"--N
C153"--N
C163-1/2"--N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

KEYCUT B2
KEYCUT A2
(TYP.)
KEYCUT B2
(TYP.)

CRACK SEAL &

SLURRY SEAL
(TYPE II)

BORING LOCATIONXX
C14
C15
C16

TYPICAL SECTION
NO. 4
SS

R&R CURB & GUTTER
WLL

COVINGTON WAY

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)
43 42
45 44

CAMINO VENTUROSO

BID ALTERNATE A

CAMINO CASETA
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 17 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA

CATHEDRAL OAKS ROAD
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
19+92
10+00
26+00
27+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAMINO LAGUNA VISTA
PKM
APRIL 2022
190192-08
1" = 40'
12 of 39
SEE SHEET 19 FOR WORK

ON COVINGTON WAY
SEE SHEET 17 FOR WORK

ON CAROLDALE LANE

COVINGTON WAY

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS

SLURRY SEAL (TYPE II)
R&R 4" AC
(~18'X10')R&R 4" AC
(~8'X22')
R&R 4" AC
(~19'X20')
R
(~20 LF)
C
C

REMOVE & REPLACER&R
SS

SS SS BRPM
R
(~14 LF)
C
R&R 4" AC
(~6'X14')
BRPM
R
(~10 LF)
C
R&R 4" AC
(~6'X10')
12" YELLOW CROSSWALK LINE (THERMO)Y
Y
R&R 4" AC
(~6'X6')
WLL
WLL

CRACK SEAL &

SLURRY SEAL
(TYPE II)
R&R 4" AC
(~6'X6')

R&R CURB & GUTTER

R&R CURB & GUTTER

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)
58 59

CAROLDALE LANE

BID ALTERNATE A

CAMINO LAGUNA VISTA

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 18 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA

CAMINO TALAVERA
5554 C
10+00 11+00
12+00
13+00
14+00
15+00
16+00
17+00
17+39
10+00
10+95
29+00
30+00
31+00
32+00
33+00
34+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
15'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAMINO TALAVERA
PKM
APRIL 2022
190192-08
1" = 40'
13 of 39
SEE SHEET 19 FOR WORK

ON COVINGTON WAY

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS

BORING LOCATIONXX
TYPE A2 KEYCUT
TYPE B2 KEYCUT

REMOVE & REPLACER&R

MANHOLE MH
MH
C17
SS
SS
SS
C20
MH
BRPM
R&R 4" AC
(~6'X20')
C18
C19

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C173"6"-N
C183-3/4"8"-N
C19 2-1/4"--N
C203"--N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

R&R 4" AC
(~10'X101')
R&R 4" AC
(~6'X16')
R&R 4" AC
(~11'X13')
R&R 4" AC
(~10'X10')KEYCUT A2
(TYP.)
KEYCUT A2
KEYCUT B2
(TYP.)
WLL

TYPICAL SECTION
NO. 4

TYPICAL SECTION
NO. 4
R&R 4" AC
(~6'X30')

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)
56 57

CCURB RAMP CONFLICT (SEE APPENDIX A)

BID ALTERNATE A

CAMINO TALAVERA

COVINGTON WAY

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 19 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA

CASETA WAY
41 40
38 39
10+00
11+00
12+00
13+00
14+00
10+00
11+00
11+91
10+00
11+00 12+00 13+00 14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
11+00
12+00
13+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:54 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAMINO VENTUROSO
PKM
APRIL 2022
190192-08
1" = 40'
14 of 39
MATCHLINE - SEE SHEET 15
SEE SHEET 18 FOR WORK

ON COVINGTON WAY

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS
SEWER CLEANOUT (EX.)SCO
R&R 4" AC
(~6'X25')
R&R 4" AC
(~6'X11')
R
BRPM
(~40 LF)
R&R 4" AC
(~6'X6')
R&R 4" AC
(~6'X30')
SS
R&R 4" AC
(~6'X6')
R&R 4" AC
(~6'X20')
(~20 LF)
R
SS
C
C
C
SSBRPM
R&R 4" AC
(~6'X12')
R
(~12 LF)
C
SS
R&R 4" AC
(~6'X10')
R
(~10 LF)
C
R&R 4" AC
(~6'X20')
TYPE A2 KEYCUT
TYPE B2 KEYCUT
R&R 4" AC
(~8'X8')

REMOVE & REPLACER&R

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C213"--N
C223"--N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

R
R
R
KEYCUT A2
(TYP.)

TYPICAL SECTION
NO. 4
WLL

BORING LOCATIONXX
C21
C22

R&R CURB & GUTTER

R&R CURB & GUTTER

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CCURB RAMP CONFLICT (SEE APPENDIX A)
C

BID ALTERNATE A

CAMINO VENTUROSO

COVINGTON WAY

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 20 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA
(~20 LF)
CR
15+00
16+00
17+00
18+00
19+00
20+00
20+51
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
35+64
19+00
20+00
21+00
22+00
23+00
24+00
10+00
11+00
11+24
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
15'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAMINO VENTUROSO
PKM
APRIL 2022
190192-08
1" = 40'
15 of 39 SEE SHEET 18 FOR WORK

ON COVINGTON WAY
MATCHLINE - SEE SHEET 14
SEE SHEET 11 FOR WORK

ON CAMINO CASETA

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS
C
SS
(~6'X6')
R
R&R 4" AC
(~6'X22')
R
(~22 LF)
C
(~22 LF)
C
SS
R

STORM DRAIN MANHOLESD
SD
SS
12" YELLOW CROSSWALK LINE (THERMO)Y
(~12 LF)
C
R&R 4" AC
(~12'X12')
R
Y

BORING LOCATIONXX
C25
R&R 4" AC
(~8'X22')
R
(~20 LF)
C
SS
BRPM
R&R 4" AC
(~6'X60')
SS
SS
R&R 4" AC
(~6'X30')
R&R 4" AC
(~6'X6')
R&R 4" AC
(~6'X6')
R
R
R&R 4" AC
(~8'X27')
R
R&R 4" AC
(~10'X26')
R&R 4" AC
(~37'X26')
TYPE A2 KEYCUT
TYPE B2 KEYCUT

REMOVE & REPLACER&R

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C23 3-1/2"--N
C242-3/4"--N
C253"--N
C26 2-1/5"--N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

C23
C24
C26
R
KEYCUT A2
(TYP.)

TYPICAL SECTION
NO. 4

R&R CURB & GUTTER

R&R CURB & GUTTER
KEYCUT B2
WLL

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CCURB RAMP CONFLICT (SEE APPENDIX A)
46 47

BID ALTERNATE A

CAMINO VENTUROSO

COVINGTON WAY

REMOVE & REPLACE (SEE PLAN FOR DEPTH)

CAMINO CASETA
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 21 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA NORTH LA PATERA LANE
10+00
11+00
12+00
13+0014+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
21+67
12+00
13+00
10+86
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAMINO VIVIENTE
PKM
APRIL 2022
190192-08
1" = 40'
16 of 39
SEE SHEET 17 FOR WORK

ON CAROLDALE LANE

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS

SLURRY SEAL (TYPE II)
C

REMOVE & REPLACER&R
12" YELLOW CROSSWALK LINE (THERMO)Y
R&R 4" AC
(~6'X10')
R
SS
R&R 4" AC
(~10'X20')
BRPMSS
R&R 4" AC
(~6'X17') (~17 LF)
C
R&R 4" AC
(~6'X17')
R
SS
BRPM
SEWER CLEANOUT (EX.)SCO
SCO
Y
Y
R&R 4" AC
(~6'X35')

CRACK SEAL &

SLURRY SEAL
(TYPE II)

R&R CURB & GUTTER

R&R CURB & GUTTER

BID ALTERNATE A

CAMINO VIVIENTE

CAROLDALE LANE

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 22 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA

CAROLDALE PLACE

NORTH LA PATERA LANE

CAMINO VIVIENTE

CAMINO LAGUNA VISTA
10+00 11+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+0018+00
19+00
19+50
10+00
10+86
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CAROLDALE LANE & CAROLDALE PLACE
PKM
APRIL 2022
190192-08
1" = 40'
17 of 39
SEE SHEET 12 FOR WORK

ON CAMINO LAGUNA VISTA
SEE SHEET 16 FOR WORK

ON CAMINO VIVIENTE

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

RPRUNE & REMOVE TREE ROOTS

SLURRY SEAL (TYPE II)

REMOVE & REPLACER&R
12" YELLOW CROSSWALK LINE (THERMO)
Y
SEWER CLEANOUT (EX.)SCO
SCO
SS
SS SS
R&R 4" AC
(~6'X100')
R&R 4" AC
(~6'X8')
R&R 4" AC
(~6'X18')
R&R 4" AC
(~6'X8')
R&R 4" AC
(~6'X6')
R
Y

CRACK SEAL &

SLURRY SEAL
(TYPE II)

CRACK SEAL &

SLURRY SEAL
(TYPE II)

BID ALTERNATE A

CAROLDALE LANE

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 23 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA

LOS CANEROS ROAD
41 40
38 39
10+00
10+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00

COVINGTON PLACE
35+0035+64
21+00
22+00
23+00
24+00
25+00
10+00
11+00
11+24
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
15'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

COVINGTON WAY & COVINGTON PLACE
PKM
APRIL 2022
190192-08
1" = 40'
18 of 39
SEE SHEET 9 FOR WORK

ON LOS CANEROS ROAD
SEE SHEET 14 FOR WORK

ON CAMINO VENTUROSO

MATCHLINE - SEE ABOVE RIGHT
MATCHLINE - SEE SHEET 19

MATCHLINE - SEE BELOW LEFT
SEE SHEET 15 FOR WORK

ON CAMINO VENTUROSO
SEE SHEET 11 FOR WORK

ON CAMINO CASETA

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS
SSSS
R&R 4" AC
(~6'X23')
R
R&R 4" AC
(~6'X23')
R&R 4" AC
(~6'X55')
R&R 4" AC
(~6'X18')
R&R 4" AC
(~6'X12')
SS
R&R 4" AC
(~6'X6')
R&R 4" AC
(~10'X32')
BRPM
SEWER CLEANOUT (EX.)SCO
SCO
(~11 LF)
SS
SS
SS SS
R&R 4" AC
(~8'X6')

REMOVE & REPLACER&R

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C275"--N
C28 6-1/2"--N
C296"--N
C32 2-3/4"--N
C33 3-1/2"--N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

TYPE A2 KEYCUT
TYPE B2 KEYCUT
KEYCUT A2
KEYCUT B2
KEYCUT A2
(TYP.)
R&R 4" AC
(~6'X16')

TYPICAL
SECTION NO. 4

TYPICAL
SECTION NO. 4
R
C
R
WLL

BORING LOCATIONXX
C27
C28
C29
C32
C33
C

R&R CURB & GUTTER

R&R CURB & GUTTER
KEYCUT B2
WLL
KEYCUT A2
WLL
WLL
WLL

CAMINO VENTUROSO

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CCURB RAMP CONFLICT (SEE APPENDIX A)
51 50
36 37
C
49 48

CAMINO VENTUROSOCAMINO CASETA
C

BID ALTERNATE A
STRIPING NOTES:

1.) STRIPING AS SHOWN REPRESENTS EXISTING &
IS SUBJECT TO CHANGE. SEE SHEET 34-35 FOR
STRIPING PLANS.

COVINGTON WAY
MATCHLINE - SEE SHEET 19

COVINGTON WAY

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 24 CATHEDRAL OAKS ROAD

CAMINO VENTUROSO

CAMINO CASETA

COVINGTON WAY

CAROLDALE LANE

N LOS CARNEROS RD

N LA PATERA LN

CAMINO VIVIENTE

CAMINO LAGUNA VISTA

NORTH LA PATERA LANE
55 54
C

CAMINO TALAVERA
10+00 11+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+00
39+33
10+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
15'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 4.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

COVINGTON WAY
PKM
APRIL 2022
190192-08
1" = 40'
19 of 39
SEE SHEET 12 FOR WORK

ON CAMINO LAGUNA VISTA

MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE SHEET
18 MATCHLINE - SEE ABOVE RIGHT
SEE SHEET 13 FOR WORK

ON CAMINO TALAVERA

KEY MAP
NTS
LEGEND

WATER VALVE

SANITARY SEWER MANHOLESS

BLUE RETROREFLECTIVE PAVEMENT MARKERBRPM
BRPM
SS
SS SS
SS
SS
SS
R&R 4" AC
(~6'X15')R&R 4" AC
(~6'X6')
12" WHITE LIMIT LINE (THERMO)WLL

RPRUNE & REMOVE TREE ROOTS
R
R
BRPM
R&R 4" AC
(~6'X10')
R
R&R 4" AC
(~6'X20')
R

REMOVE & REPLACER&R
SS
R&R 4" AC (~8'X21')
R&R 4" AC (~14'X12')

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C305"--N
C316-1/2"--N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

TYPE A2 KEYCUT
TYPE B2 KEYCUT
KEYCUT A2
(TYP.)
KEYCUT B2
KEYCUT A2
(TYP.)
WLL
W12" WHITE CROSSWALK LINE (THERMO)
W
WLL
WLL
R&R 4" AC
(~6'X12')

TYPICAL SECTION
NO. 4

TYPICAL SECTION
NO. 4

BORING LOCATIONXX
C30
C31

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CCURB RAMP CONFLICT (SEE APPENDIX A)
59 58 CAMINO LAGUNA VISTA
53 52

BID ALTERNATE A
STRIPING NOTES:

1.) STRIPING AS SHOWN REPRESENTS EXISTING &
IS SUBJECT TO CHANGE. SEE SHEET X FOR
STRIPING PLANS.

COVINGTON WAY

COVINGTON WAY

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 25 DEERHURST DRIVE

BRANDON DRIVE

SALISBURY AVENUE
BRPM
SSSS
SS
SCO
Y
Y
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
KEYCUT B1
Y
C36
C37
KEYCUT B1
10+00
11+00
12+0013+00
14+00
15+00
16+00
17+00
18+00
19+00

CARLISLE AVENUE
C35
SS
SS
BRPMC34
SCO
20+00
21+00
22+00
23+00
24+00
25+00
26+00
26+47
NTS
TYPICAL SECTION NO. 1
3"3"
6'
KEYCUT A1
6'
KEYCUT A1

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
2" 2"
2" SURFACE COURSE
ARHM (GG-D PG 64-10)
1/2" LEVELING COURSE
AC (D2 PG 64-10)R&R (SEE PLAN

FOR LOCATION
& DEPTH)
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
17'
KEYCUT - TYPE A1

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B1

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
2"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
2" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE

PADOVA DRIVE

PADOVA DRIVE

ALPINE DRIVE

ALAMEDA AVE

SALIBURY AVE

BRANDON DRIVE

SAN ROSSANO DR
HWY 101

EVERGREEN PARK
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 5 & 6.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

PADOVA DRIVE (SALISBURY AVENUE TO SAN ROSSANO DRIVE)
PKM
APRIL 2022
190192-08
1" = 40'
20 of 39

MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT

PADOVA DRIVE

PADOVA DRIVE

SAN ROSSANO DRIVE

REMOVE & REPLACE

SPEED HUMP
LEGEND

BORING LOCATION
TYPE A1 KEYCUT

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)
12" YELLOW CROSSWALK LINE (THERMO)
XX
WLL
Y
SEWER CLEANOUT (EX.)SCO
BRPM

SANITARY SEWER MANHOLESS
TYPE B1 KEYCUT
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
KEYCUT B1

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C34 3-1/4"-N
C35 3-3/4"-N
C363"-N
C37 5-1/2"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

KEY MAP
NTS
64 63
66 65
70 67
6869
C
C
71 72C

BID ALTERNATE B

REMOVE & REPLACE

SPEED HUMP

REMOVE & REPLACE

SPEED HUMP

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
B
B

ASPHALT
HUMP
CURB &

GUTTER CURB &
GUTTER
1'
TAPER

SECTION A-A
1'
TAPER

SPEED HUMP DETAIL
NTS
A
A

SECTION B-B
18'
36'

ROADWAY

SURFACE
NTS
NTS

FINAL TEMPLATE
NTS

FINAL LIFT

FIRST LIFT

INITIAL TEMPLATE

TEMPLATE DETAIL

CONSTRUCTION NOTES

1. ASPHALT HUMP SHALL BE 36' X 2-5/8" 1/8".

2. USING TWO TEMPLATES ASPHALT HUMPS SHALL BE HAND LAID IN TWO LIFTS AND HOT ROLLED OVER A TACK COAT.

3. ASPHALT HUMP SHALL BE INSTALLED ACROSS THE ENTIRE WIDTH OF

THE STREET FROM GUTTER TO GUTTER WITH THE LAST ONE FOOT

TAPERED FLUSH WITH THE PAVEMENT TO MINIMIZE GUTTER
RUNNING AND TO PRESERVE GUTTER FLOWS.

4. ASPHALT HUMP SHALL BE CONSTRUCTED USING D2 (PG-70-10) MATERIAL. 0 .42"
.80"

1.46"

1.97"

2.34"

2.55"

2.62"

1.15"

1.73"

2.17"

2.46"

2.61"
6"
6'12'18'24'30'36' 0'
0'6'12'18'24'
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 26 ALPINE DRIVE

PLACER DRIVE
SSSSSS
R&R 4" AC
(~6'X15')
R
C39
TYPICAL SECTION NO. 1KEYCUT A1 (TYP.)
C38
KEYCUT B1
KEYCUT B1
10+00
11+0012+0013+0013+39
10+00
11+0012+00

VERONA AVENUEVERONA AVENUE
SSSSSS
C41
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
KEYCUT B1
C40

ALAMEDA AVENUE
13+00
14+00
15+0016+0017+00
18+0018+23
NTS
TYPICAL SECTION NO. 1
3"3"
6'
KEYCUT A1
6'
KEYCUT A1

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
2" 2"
2" SURFACE COURSE
ARHM (GG-D PG 64-10)
1/2" LEVELING COURSE
AC (D2 PG 64-10)R&R (SEE PLAN

FOR LOCATION
& DEPTH)
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
17'
KEYCUT - TYPE A1

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B1

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
2"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
2" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE

PADOVA DRIVE

PADOVA DRIVE

ALPINE DRIVE

ALAMEDA AVE

SALIBURY AVE

BRANDON DRIVE

SAN ROSSANO DR
HWY 101

EVERGREEN PARK

PADOVA DRIVE (WEST END TO ALAMEDA AVENUE)
PKM
APRIL 2022
190192-08
1" = 40'
21 of 39

MATCHLINE - SEE BELOW LEFT

PADOVA DRIVE

MATCHLINE - SEE BELOW LEFTPADOVA DRIVE
LEGEND

BORING LOCATION
TYPE A1 KEYCUT

WATER VALVE
12" WHITE LIMIT LINE (THERMO)
XX
WLL

RPRUNE & REMOVE TREE ROOTS

SANITARY SEWER MANHOLESS
TYPE B1 KEYCUT

REMOVE AND REPLACER&R
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 5 & 6.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C38 3-12/"-N
C39 3-1/4"-N
C40 2-3/4"-N
C413"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

KEY MAP
NTS
76 7781
80 78
79 C
CC
83 8285 8486
87 BID ALTERNATE C
W
W
W
W

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 27 REED COURT

PACIFIC OAKS ROAD
BRPM
R&R 5" AC
(~10'X9')
R&R 5" AC
(~6'X52')
R&R 5" AC
(~8'X60')
R&R 5" AC
(~8'X84')
WLL
WLL
TYPICAL SECTION NO. 4
KEYCUT A2 (TYP.)
KEYCUT B2 (TYP.)
C43
C44
C45

PITZER COURT
10+00
11+00
12+00
13+00
14+00
15+00
16+00
16+33
10+00
11+00
12+00
13+00
SS
SS
SS
SS

POMONA COURT
MILLS WAY R&R 5" AC
(~8'X84')

CONTINUED
R&R 5" AC
(~6'X166')
R&R 5" AC
(~6'X160')
R&R 5" AC
(~6'X74')
R&R 5" AC
(~6'X26')
R&R 5" AC
(~6'X25')
R&R 5" AC
(~20'X17')
R&R 5" AC
(~6'X42')
WLL
KEYCUT A2
(TYP.)
KEYCUT B2
C42
14+00
15+00
16+00
17+00
18+00
19+00
20+00
20+11
SS
SS
NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
NTS
REMOVE & REPLACE 5" AC
REMOVE 5"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. HMA MAY BE REPLACED IN A SINGLE 5" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

PLACE 3" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE

EX, PAVEMENT, GUTTER

LIP OR SPANDREL

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
SEE NOTE 1
15'
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 7.DWG Plot Date: 4/14/2022 11:55 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

ARMSTRONG ROAD (REED COURT TO MILLS WAY)
--
APRIL 2022
190192-08
1" = 40'
22 of 39

MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT

ARMSTRONG ROAD

ARMSTRONG ROAD

PEPPERDINE COURT
LEGEND

BORING LOCATION

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
12" WHITE LIMIT LINE (THERMO)
XX
WLL
BRPM

SANITARY SEWER MANHOLESS

REMOVE & REPLACER&R
TYPE A2 KEYCUT
TYPE B2 KEYCUT
TYPICAL SECTION NO. 4
TYPICAL SECTION NO. 4

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C42 4-1/4"-N
C434"-N
C443"-N
C45 3-1/2"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
88 89
C
C
9193
90 92
C
94 95
9697C
9899C
101
100C
C

BID ALTERNATE D
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 28 BRPM
R&R 4" AC
(~15'X30')
WLL

CRACK FILL & SLURRY

SEAL (TYPE II)

CRACK FILL & SLURRY

SEAL (TYPE II)
SD

NO WORK ON

STAMPED CONCRETE RITZ CARLTON GATE

RITZ CARLTON INN
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+0018+00
19+00
SS
SS
SS
SD
U
U
U
U
BRPM
BRPM
R&R 4" AC
(~10'X10')
R&R 4" AC
(~6'X33')

CRACK FILL & SLURRY

SEAL (TYPE II)
20+00
21+00
22+00
23+00
24+00
25+00
26+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 8.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER
HOLLISTER AVENUE (GATE @ WEST END TO CATHEDRAL OAKS ROAD) PKM
APRIL 2022
190192-08
1" = 40'
23 of 39

MATCHLINE - SEE BELOW LEFT

HOLLISTER AVENUE

MATCHLINE - SEE ABOVE RIGHT
MATCHLINE - SEE SHEET 24

HOLLISTER AVENUE
LEGEND

REMOVE & REPLACE (SEE PLAN FOR DEPTH)

WATER VALVE

CRACK FILL & SLURRY SEAL (TYPE II)

STORM DRAIN MANHOLESD

SANITARY SEWER MANHOLESS

UTILITY MANHOLEU
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)
WLL

BID ALTERNATE E
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 29 U
U
U
U
R&R 4" AC
(~6'X16')
R&R 4" AC
(~6'X33')
R&R 4" AC
(~12'X35')
R&R 4" AC
(~6'X26')

CRACK FILL & SLURRY

SEAL (TYPE II)

NO WORK ON

BRIDGE DECK
R&R 4" AC
(~53'X10')

DRIVEWAY

DRIVEWAY
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
SD
U
SD
SD
U
U
U
U
U
U
U
R&R 4" AC
(~6'X6')
R&R 4" AC
(~6'X26')

CRACK FILL & SLURRY

SEAL (TYPE II)

CRACK FILL & SLURRY

SEAL (TYPE II)

NO WORK ON

BRIDGE DECK
35+00
36+00
37+00
38+00
39+00
40+00
41+00
42+00
43+00
44+00
45+00
46+00
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 8.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER
HOLLISTER AVENUE (GATE @ WEST END TO CATHEDRAL OAKS ROAD) PKM
APRIL 2022
190192-08
1" = 40'
24 of 39

MATCHLINE - SEE SHEET
23 MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT

MATCHLINE - SEE SHEET
25 HOLLISTER AVENUE

HOLLISTER AVENUE
LEGEND

WATER VALVE

CRACK FILL & SLURRY SEAL (TYPE II)

STORM DRAIN MANHOLED

UTILITY MANHOLEU
CALTRANS STRIPING DETAIL "XX"

BID ALTERNATE E

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 30 SD
R&R 4" AC
(~6'X33')

CRACK FILL & SLURRY

SEAL (TYPE II)
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
SD
SD
BRPM
BRPM
WLL
WLL

CRACK FILL & SLURRY

SEAL (TYPE II)
54+00
55+00
56+00
57+00
58+00
59+00
60+00
61+00
62+00
63+00
63+72
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 8.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER
HOLLISTER AVENUE(GATE @ WEST END TO CATHEDRAL OAKS ROAD) PKM
APRIL 2022
190192-08
1" = 40'
25 of 39

MATCHLINE - SEE SHEET
24 MATCHLINE - SEE BELOW LEFT

MATCHLINE - SEE ABOVE RIGHT

HOLLISTER AVENUE

HOLLISTER AVENUE
LEGEND

WATER VALVE

CRACK FILL & SLURRY SEAL (TYPE II)

STORM DRAIN MANHOLESD
CALTRANS STRIPING DETAIL "XX"
12" WHITE LIMIT LINE (THERMO)
WLL

BID ALTERNATE E

CATHEDRAL OAKS ROAD

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 31 CORONADO DRIVE
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+0021+00

NEWPORT DR

PALOS VERDES DR

CORONADO DR

DAYTONA DR

SEA GULL DR

SANTA BARBARA SHORES DR
NTS
REMOVE & REPLACE 8" AC
REMOVE 8"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

PLACE 3" (C2 PG 64-10) BASE COURSE,
3" AC (C2 PG 64-10) INTERMEDIATE COURSE,
2" AC (C2 PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
15'
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 9.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

NEWPORT DRIVE
PKM
APRIL 2022
190192-08
1" = 40'
26 of 39
MATCHLINE - SEE SHEET 27

KEY MAP
NTS

BORING LOCATION

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
XX
BRPM

SANITARY SEWER MANHOLESS

GAS VALVEGV
GV

RPRUNE & REMOVE TREE ROOTS
R
R&R 6" AC
(~6'X21')
SS
C46
SS
SS
BRPM
R&R 6" AC
(~8'X20')
R&R 6" AC
(~13'X26')
R&R 6" AC
(~19'X8')
R

REMOVE AND REPLACER&R
W12" WHITE CROSSWALK LINE (THERMO)
W
LEGEND

REMOVE & REPLACE PCC CURB & GUTTER
TYPE A2 KEYCUT
TYPE B2 KEYCUT

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
TYPICAL SECTION NO. 4
KEYCUT A2 (TYP.)
KEYCUT B2

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C465"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
133
134

BID ALTERNATE F

NEWPORT DRIVE
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 32 NEWPORT DRIVE

PALOS VERDES DRIVE
SS
C48
C50
SSBRPM
C51
SS
SCO
R&R 4" AC
(~6'X22')
R
R&R 4" AC
(~6'X10')

R&R PCC
CURB (~10'LF)
R
TYPICAL SECTION NO. 4
KEYCUT A2 (TYP.)
KEYCUT B2
C49 22+0023+0024+0025+0026+00 26+11
10+00
11+00
12+0013+00
14+00
14+33

NEWPORT DR

PALOS VERDES DR

CORONADO DR

DAYTONA DR

SEA GULL DR

SANTA BARBARA SHORES DR
NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2. AC MAY BE REPLACED IN A SINGLE 4" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
PLACE 2" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE
NTS
TYPICAL SECTION NO. 4
3"3"
6'
KEYCUT A2
6'
KEYCUT A2

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
1-3/4" 1-3/4"1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN FOR

LOCATION & DEPTH)
1-3/4" ARHM SURFACE COURSE
ARHM (GG-D PG 64-10)
15'
KEYCUT - TYPE A2

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B2

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
1-3/4"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
1-3/4" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
NTS
TYPICAL SECTION NO. 1
3"3"
6'
KEYCUT A1
6'
KEYCUT A1

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
2" 2"
2" SURFACE COURSE
ARHM (GG-D PG 64-10)
1/2" LEVELING COURSE
AC (D2 PG 64-10) R&R (SEE PLAN

FOR LOCATION
& DEPTH)
KEYCUT - TYPE A1

LONGITUDINAL KEYCUT
NTS
6'
EX. CURB
& GUTTER
2"
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 9.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

NEWPORT DRIVE & PALOS VERDES DRIVE
PKM
APRIL 2022
190192-08
1" = 40'
27 of 39
MATCHLINE - SEE SHEET 26

KEY MAP
NTS
LEGEND

BORING LOCATION

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
XX
BRPM

SANITARY SEWER MANHOLESS

GAS VALVEGV

RPRUNE & REMOVE TREE ROOTS

REMOVE AND REPLACER&R
W12" WHITE CROSSWALK LINE (THERMO)

SURVEY MONUMENT

PORTLAND CEMENT CONCRETEPCC
R

REMOVE & REPLACE PCC CURB & GUTTER
SEWER CLEANOUT (EX.)SCO
TYPE A2 KEYCUT
TYPE A1 KEYCUT
TYPE B2 KEYCUT
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
R
(~20 LF)CR
R&R 4" AC
(~6'X10')

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C485"-N
C49 5-1/2"-N
C50 2-3/4"-N
C513"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).
135
136C
C

BID ALTERNATE F
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 33 PACIFIC OAKS ROAD

MILLS WAY
SS
SS
SD
R&R 5" AC
(~6'X6')
R
R&R 5"
AC(~6'X6')
R

R&R PCC CURB
(~39 LF)R&R PCC CURB
(~37 LF)
R&R 5" AC
(~13'X2244')
C53
C54
C56
TYPICAL SECTION NO. 5
KEYCUT A1 (TYP.)
KEYCUT B1
10+00
11+00
12+00
13+00
14+0015+00
16+00
17+00
18+00
19+00
20+00
21+00
SS
SS
SS
TSS
SS

BRPM BRPM
BRPM
R&R 5" AC
(~6'X13')R
R&R 5" AC
(~6'X12')R
R&R 5" AC
(~6'X6')

WHITMAN ST
C52
C55
C56
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
32+41
NTS
REMOVE & REPLACE 5" AC
REMOVE 5"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

2.HMA MAY BE REPLACED IN A SINGLE 5" LIFT IF REPAIR IS LOCATED UNDER AN OVERLAY.

PLACE 3" AC (C2 PG 64-10) BASE COURSE
& 2" AC (C2 PG 64-10) SURFACE COURSE

EX, PAVEMENT, GUTTER

LIP OR SPANDREL

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING
SEE NOTE 1
NTS
TYPICAL SECTION NO. 5
6'
KEYCUT A1
13'

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
2" 2"
2" ARHM SURFACE COURSE
(GG-D PG 64-10)
R&R 5" AC
MEDIAN
(VARIES)
3"
6'
KEYCUT A1
NOTES:

1.THE REMOVE & REPLACE WORK IN THE EASTBOUND LANE WILL BE PAID UNDER TWO SEPARATE BID ITEMS; R&R 5" AC AND KEYCUT TYPE A1.

THE KEYCUT PAY ITEM IS TO ACCOUNT FOR THE ADDITIONAL REMOVAL AND DISPOSAL OF MATERIAL.
1/2" LEVELING COURSE
AC (D2 PG 64-10)
3"
17'
KEYCUT - TYPE A1

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B1

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
2"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
2" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 10 & 11.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

PHELPS ROAD (PACIFIC OAKS ROAD TO STORKE ROAD)
PKM
APRIL 2022
190192-08
1" = 40'
28 of 39

PHELPS ROAD

MATCHLINE - SEE BELOW LEFT

PHELPS ROAD

MATCHLINE - SEE ABOVE RIGHT

STORKE ROAD
LEGEND

BORING LOCATION
TYPE A1 KEYCUT

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
XX
BRPM

SANITARY SEWER MANHOLESS
TYPE B1 KEYCUT

REMOVE & REPLACE PCC CURB & GUTTER

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C525"7"57N
C535"7"56N
C544"6"67N
C557"13"-N
C567"15"-N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

KEYCUT B1
TYPICAL SECTION NO. 5
KEYCUT A1 (TYP.)
6 C 5
1214
18 20
22 21
13 11
C
C
17 19
C
C
C

BID ALTERNATE G
STRIPING NOTES:

1.) STRIPING AS SHOWN REPRESENTS EXISTING &
IS SUBJECT TO CHANGE. SEE SHEET 36-37 FOR
STRIPING PLANS.

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CCURB RAMP CONFLICT (SEE APPENDIX A)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 34 BRPM
SS
SS
SS
C57
C58
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
KEYCUT B1
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
SD

BRPMSSSSSD
C59
TYPICAL SECTION NO. 1
KEYCUT A1 (TYP.)
19+00
20+00
21+00
22+00
23+00
23+77
NTS
TYPICAL SECTION NO. 1
3"3"
6'
KEYCUT A1
6'
KEYCUT A1

TAPER LEVELING COURSE OVER WIDTH
OF KEYCUT TO 0" THICKNESS, 3" FROM
GUTTER LIP (TYP.)
2" 2"
2" SURFACE COURSE
ARHM (GG-D PG 64-10)
1/2" LEVELING COURSE
AC (D2 PG 64-10)R&R (SEE PLAN

FOR LOCATION
& DEPTH)
17'
KEYCUT - TYPE A1

LONGITUDINAL KEYCUT
NTS
6'
KEYCUT - TYPE B1

TRANSVERSE KEYCUT
NTS
EX. CURB
& GUTTER
2"
REMOVE EX.

PAVEMENT
EX. PAVEMENT OR

CROSS GUTTER
2" EX. PAVEMENT SURFACE
REMOVE EX.

PAVEMENT
EX. PAVEMENT SURFACE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 10 & 11.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

PHELPS ROAD (STORKE ROAD TO CUL-DE-SAC)
PKM
APRIL 2022
190192-08
1" = 40'
29 of 39

PHELPS ROAD

MATCHLINE - SEE BELOW LEFT

PHELPS ROAD

MATCHLINE - SEE ABOVE RIGHT

BAYBERRY LANE

STORKE ROAD
LEGEND

BORING LOCATION
TYPE A1 KEYCUT

WATER VALVE

BLUE RETROREFLECTIVE PAVEMENT MARKER
XX
BRPM

SANITARY SEWER MANHOLESS
TYPE B1 KEYCUT

BORING LOG
NO.ACR-VALUEFABRIC (Y/N)
C573"57N
C586"56N
C59 3-1/2"67N
*CORING DATA IS FOR INFORMATION ONLY. EXISTING

SECTION MAY VARY FROM SECTION(S) FOUND AT
CORING LOCATION(S). FABRIC MAY BE PRESENT IN

SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

STORM DRAIN MANHOLESD
23 C 24
26 25
27 29
30 313233
C
34 35

BID ALTERNATE H

DRIVEWAY
STRIPING NOTES:

1.) STRIPING AS SHOWN REPRESENTS EXISTING &
IS SUBJECT TO CHANGE. SEE SHEET 36-37 FOR
STRIPING PLANS.

XXCURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CCURB RAMP CONFLICT (SEE APPENDIX A)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 35 EVERGREEN DRIVEROYAL LINDA DRIVEKING DANIEL LANE

NORTHGATE DRIVE
TYPICAL SECTION NO.6

REMOVE & REPLACE

OVERSIDE DRAIN
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00

PLACER DRIVE
TYPICAL SECTION NO.6
C60
C63
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00

ALAMEDA AVENUE
TYPICAL SECTION NO.6
32+00
33+00
33+96
TYPICAL SECTION NO. 6
NTS
CONSTRUCTION SEQUENCE:

1. PULVERIZE HMA & BASE MAT'L TO A DEPTH OF 12".

2. REMOVE & DISPOSE OF PULVERIZED MAT'L TO A DEPTH OF 6-1/2".

3. QUICKLIME &/OR CEMENT SOIL TREATMENT PER APPROVED MIX DESIGN TO A DEPTH OF 12"; REGRADE ROADWAY SURFACE TO 2% CROSS SLOPE.

4. PLACE 2-1/2" AC BASE COURSE.

5. PLACE 2" AC INTERMEDIATE COURSE.

6. PLACE 2" ARHM SURFACE COURSE.
6-1/2"
PULVERIZE EX. PAVEMENTLIME/CEMENT SOIL TREATMENT;
& UNDERLYING AGG. BASE

REMOVE & DISPOSE OF

PULVERIZED MAT'L
REGRADE SURFACE TO 2% CROSS SLOPE
2" HMA INTERMEDIATE COURSE
2" RHMA SURFACE COURSE
2-1/2" HMA BASE COURSE
12"
12"

ALTERNATIVE PAVEMENT EDGE
TYPICAL SECTION NO.5
~2.0%
~2.0%
EX. SHOULDER,

PAVEMENT OR

VALLEY GUTTER
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 12.DWG Plot Date: 4/14/2022 11:56 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CATHEDRAL OAKS ROAD (EVERGREEN DRIVE TO ALAMEDA AVENUE) PKM
APRIL 2022
190192-08
1" = 40'
30 of 39
LEGEND

MATCHLINE - SEE ABOVE RIGHT

MATCHLINE - SEE BELOW LEFT MATCHLINE - SEE BELOW LEFT

MATCHLINE SEE - ABOVE RIGHT

CATHEDRAL OAKS ROAD

CATHEDRAL OAKS ROAD

CATHEDRAL OAKS ROAD

BORING LOG
NO.ACABR-VALUEFABRIC (Y/N)
C6013.5"6"29Y
C6114"10"-N
C62 6-1/2"18"23Y
C635"12"-N
C647"8"63Y
*CORING DATA IS FOR INFORMATION ONLY. EXISTING SECTION MAY VARY FROM SECTION(S) FOUND AT CORING LOCATION(S). FABRIC

MAY BE PRESENT IN SECTIONS EVEN IF NOT FOUND AT CORING
LOCATION(S).

BORING LOCATIONXX
C61
C64
107108110 109
112
113C

FULL DEPTH RECLAMATION
XX
C

CURB RAMP REFERENCE NUMBER (SEE APPENDIX A)

CURB RAMP CONFLICT (SEE APPENDIX A)

BID ALTERNATE I
STRIPING NOTES:

1.) STRIPING AS SHOWN REPRESENTS EXISTING &
IS SUBJECT TO CHANGE. SEE SHEET 38 FOR
STRIPING PLANS.
1"

SEE SPECS FOR

BACKFILL
NTS

AC BERM DETAIL

PAVEMENT SECTION
(SEE PLAN)
3" MIN.
6"
3"
11"
3" 5"

REMOVE & REPLACE AC BERM

REMOVE & REPLACE AC BERM

REMOVE & REPLACE AC BERM

REMOVE & REPLACE AC BERM
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 36 VIA TRENTO

VIA MESSINA

CAMBRIDGE DRIVE

VIA SALERNO
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08_ADDITIONAL WORK EXHIBIT.DWG Plot Date: 4/14/2022 11:57 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

TREE ROOT REPAIRS - VARIOUS STREETS
CH
APRIL 2022
190192-08
1" = 40'
LEGEND
REMOVE & REPLACE 4" AC

VIA BALZANO
R&R 4" AC
(~10'X10')
R
R&R 4" AC
(~16'X13')
R&R 4" AC
(~8'X15')
R
R
R&R 4" AC
(~6'X6')
R
R&R 4" AC
(~6'X6')
R&R 4" AC
(~18'X6')
R
R

RPRUNE & REMOVE TREE ROOTS

REMOVE AND REPLACER&R NTS
REMOVE & REPLACE 4" AC
REMOVE 4"

PAVEMENT
NOTES:

1. RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

PLACE 2" AC BASE COURSE
& 2" AC SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
31 of 39

BID ALTERNATE J

BERKELEY ROAD

CAMBRIDGE DRIVE
R&R 4" AC
(~20'X20')
R
R&R 4" AC
(~16'X15')
R
R&R 4" AC
(~6'X15')R

NORTH LA PATERA LANE

LA PATERA PLACE R&R PCC
CURB (~15'LF)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 37 HOLLISTER AVENUE
US 101US 101

SB ONSB ON
OKONLY
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
US 101US 101

SB ONSB ON
OKONLY
18+0019+00
20+00
21+00
22+00
22+24
NTS
REMOVE & REPLACE 8" AC
REMOVE 8"

PAVEMENT
NOTES:

1.RECOMPACT LOOSENED MATERIAL AT SURFACE. IF CONTRACTOR DISTURBS MORE THAN 1-1/2" OF MATERIAL, SUBGRADE SHALL BE RECOMPACTED TO 95% R.C.

PLACE 3" (C2 PG 64-10) BASE COURSE,
3" AC (C2 PG 64-10) INTERMEDIATE COURSE,
2" AC (C2 PG 64-10) SURFACE COURSE
SEE NOTE 1

TACK COAT ALL VERTICAL

EDGES PRIOR TO PAVING

EX, PAVEMENT, GUTTER

LIP OR SPANDREL
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192-08 SITE01_PRIORITY 2 & 3.DWG Plot Date: 4/14/2022 11:57 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22
CIVIL

STATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER
STORKE ROAD (HOLLISTER AVENUE TO US 101 SB ON-RAMP)
CH
APRIL 2022
190192-08
1" = 40'

STORKE ROAD

MATCHLINE -

SEE BELOW LEFT

MATCHLINE -

SEE BELOW LEFT
32 of 39
US 101 SB ON-RAMP

STORKE ROAD
LEGEND
R&R 8" AC
(~11'X25')R&R 8" AC
(~6'X40')
R&R 8" AC
(~6'X6')
R&R 8" AC
(~7'X42')
R&R 8" AC
(~6'X26')R&R 8" AC
(~6'X88')R&R 8" AC
(~6'X8')
R&R 8" AC
(~6'X6')
R&R 8" AC
(~6'X10')
R&R 8" AC
(~6'X25')
R&R 8" AC
(~6'X30')
R&R 8" AC
(~6'X41')
R&R 8" AC
(~22'X91')
R&R 8" AC
(~18'X70')
R&R 8" AC
(~6'X10')
R&R 8" AC
(~6'X11')
R&R 8" AC
(~18'X68')
R&R 8" AC
(~6'X56')
R&R 8" AC
(~11'X42') CONT.

R&R 8" AC
(~6'X26')
R&R 8" AC
(~6'X62')
R&R 8" AC
(~11'X56')
R&R 8" AC
(~6'X27')
R&R 8" AC
(~6'X28')
R&R 8" AC
(~6'X30')
R&R 8" AC
(~11'X24')
R&R 8" AC
(~18'X27')
R&R 8" AC
(~6'X76')
R&R 8" AC
(~6'X14')
R&R 8" AC
(~6'X14')
R&R 8" AC
(~6'X14')
R&R 8" AC
(~6'X15') R&R 8" AC
(~18'X40')
R&R 8" AC
(~6'X17')
R&R 8" AC
(~11'X60')
R&R 8" AC
(~6'X20')
R&R 8" AC
(~22'X103)

BID ALTERNATE K

REMOVE & REPLACE (SEE PLAN FOR DEPTH)
STRIPING NOTES:

1.) STRIPING AS SHOWN REPRESENTS EXISTING &
IS SUBJECT TO CHANGE. SEE SHEET 39 FOR
STRIPING PLANS.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 38 T
6'

6.7'
5' 3'

2.5'

3.7'

4.8'
N89° 55' 58"E

21.11'
C1
C2
C3
S01° 19' 19"W

19.19'
C4

HOLLISTER AVENUE

STORKE ROAD
1 1
2 2
2 4
4 4
5 6
3 3
3 CURVE TABLE
CURVE #
C1
C2
C3
C4
LENGTH

2.61 29.41

2.51 3.19
RADIUS

1.00 68.00

1.00 2.00
DELTA
149.3489

24.7805
144.0424

91.3892

CONTROL POINT TABLE
Point #
203
1023
204

RAW DESCRIPTION
FD TAG LS6098

CP MAGTAG
FD SPNDL6098

ELEVATION

47.794

48.443

47.513

NORTHING
192.5726
211.3485
206.6228

EASTING
3296.1780
3316.3262
3331.7157

REMOVE & REPLACE PCC SIDEWALK

INSTALL DETECTABLE WARNING SURFACE

GRADE BREAK
LEGEND

EP EDGE OF PAVEMENT

SW SIDEWALK
EXIST. ELEVATION

DESIGN ELEVATION

TC TOP OF CURB

ENLARGEMENT
1"= 5'
TRAFFIC SIGNAL POLE (EX.)

CONSTRUCT PCC RETAINING CURB
ENLARGEMENT "C" NOTES:

REMOVE EXISTING MEDIAN ISLAND & CONSTRUCT MEDIAN ISLAND TYPE C PASSAGEWAY PER CALTRANS STANDARD PLAN A88B.

CONSTRUCT PCC SIDEWALK PER SANTA BARBARA COUNTY
ENGINEERING STANDARD DETAIL 5-010.

CONSTRUCT TYPE A CURB PER SANTA BARBARA COUNTY ENGINEERING STANDARD DETAIL 4-030.

INSTALL CAST IN PLACE DETECTABLE WARNING SURFACE.

RESET TELEPHONE MANHOLE FLUSH IN NEW SIDEWALK SURFACE.

PROTECT IN PLACE EXISTING TRAFFIC SIGNAL POLE & BASE.
1 2
3 4
5 STORKE ROAD @ HOLLISTER AVENUE
Path: Z:\SHARED\R DRIVE\ACTIVE PROJECTS\GOLETA, CITY OF\190192\TASK 08\DRAWINGS\190192_08-CURB RAMP DESIGNS STORKE ROAD.DWG Plot Date: 4/14/2022 11:57 AM SHEET NUMBER:

PROJECT NUMBER:

SCALE:

DATE:

DRAWN BY:

Pavement Engineering Inc.

You can ride on our reputation
Corporate Office:
3485 Sacramento Drive, Suite A
San Luis Obispo, CA 93401
805.781.2265

VERIFY SCALE

BAR REPRESENTS
1" ON ORIGINAL
2022/2023 PAVEMENT REHABILITATION PROJECT

CITY OF GOLETA
JOSEPH L. RIRIE
C52735
Exp. 12-31-22

CIVILSTATE OF CALIFORNIA

REGISTEREDPROFESSIONALENGINEER

CURB RAMP ENLARGEMENT

TELEPHONE MAN HOLET
6 33 of 39
JE
190192-08
1" = 5'
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 39 ||||||
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 40 |||
|||
|||
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 41 DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 42 DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 43 DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 44 DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 45 ATTACHMENT 2

2022-2023 Pavement Rehabilitation Project - Specs

46 CITY OF GOLETA

CONTRACT BIDDING DOCUMENTS

SPECIFICATIONS AND STANDARD DRAWINGS

FOR THE

2022-2023 PAVEMENT REHABILITATION PROJECT

By _____________________
Charles W. Ebeling,
Public Works Director

Project Number: 5800-1
Bid N
umber: 22-xx Bid Opening: Thursday, June 16, 2022 @ 3:00 P.M.

For use with Greenbook Standard Specifications and Standard Plans 2018 Edition (including applicable amendments)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 47 2022–2023 PAVEMENT REHABILITATION PROJECT

ii

This Page Intentionally Left Blank

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 48 2022–2023 PAVEMENT REHABILITATION PROJECT

iii

TABLE OF CONTENTS

This contract shall be in conformance with the Standard Specification for Public Works Construction, 2018 Edition (SSPWS or Greenbook 2018) (including amendments current as of the date of the Notice Inviting Sealed Bids, which are incorporated by reference) and supplements with CALTRANS STANDARD SPECIFICATIONS, 2015 EDITION

SECTION

A. NOTICE INVITING SEALED BIDS ...................................................................................... A-1

B. BIDDING INSTRUCTIONS .................................................................................................. B-1

1. ATTACHMENT A TO BIDDING INSTRUCTIONS – EQUAL SUBSTITUTION REQUEST FORM……………………………………………………………………………B-11

C. PROPOSAL ........................................................................................................................ C-1

BIDDING SHEET ................................................................................................................. C-4

D. CONTRACT ......................................................................................................................... D-1

1. CONTRACT…………………………………………………………………………………….D-2

2. PERFORMANCE BOND FORM……………………………………………………………D-11

3. PAYMENT BOND FORM……………………………………………………………………D-17

E. CITY GENERAL PROVISIONS ........................................................................................... E-1 Division I – GENERAL PROVISIONS…………………………………………………………….……E-1 Section 1 – No Changes……………………………………………………………………...…E-1 Section 2 – Scope of Work……………………………………………………………………...E-1 Section 3 – Control of Work………………..…………………………………………………...E-2 Section 4 – Control of Materials……………………………………………………………......E-3 Section 5 – Legal Relations and Responsibility to the Public…..………………………......E-3 Section 6 – Prosecution and Progress…………………………………………………….......E-5

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 49 2022–2023 PAVEMENT REHABILITATION PROJECT

iv
Section 7 – Measurement and Payment………………………………………………………E-7

Progress Payment Request Form ........................................................................ E-9 Progress Payment Request – Detail Form ......................................................... E-10 Quantity Change Verification Form .................................................................... E-11 Final Release Payment Form ............................................................................. E-12 Post-Construction Waste Reduction & Recycling Summary Report Form ......... E-13 Acknowledgement of Final Closeout and Release of Claims Form .................... E-14 Section 8 – No Changes………………..……………………………………………………...E-18 Section 9 – Claim Resolution Process......…………………..………….…………….......... E-18 Section 10 – Potential Claims and Dispute Resolution.………………………….…………E-18

F. CITY SPECIAL PROVISIONS ............................................................................................. F-1

APPENDICES

A. Standards

1. City of Goleta Standards / County of Santa Barbara Standard Plans

2. Green Book Standard Plans

3. Caltrans Standard Plans

4. Sample Door Hanger

5. Temporary No Parking Sign
B. Water Pollution Control Plan (WPCP)
C. Prevailing Wage Rates
D. School Zone Work Hour Restriction Map
E. Hollister Avenue Pavement Repair
F. C48 (CA) Sign Detail

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 50 2022–2023 PAVEMENT REHABILITATION PROJECT

A-1

SECTION A NOTICE INVITING SEALED BIDS

NOTICE INVITING SEALED BIDS

FOR THE
2022–2023 PAVEMENT REHABILITATION PROJECT

130 Cremona Drive, Suite B, City of Goleta, CA

PUBLIC NOTICE IS HEREBY GIVEN that the City of Goleta (“CITY”), invites sealed bids for the abov
e stated project and will rece ive such bids until 3:00 P.M., June 16, 2022, via electronic transmission on the City of Goleta PlanetBids portal site which can be accessed at the CITY website link below , and will be publicly opened and posted promptly thereafter. Copies of the Contract Documents and Specifications are available from the CITY, 130 Cremona Drive, Suite B, Goleta, California 93117 upon payment of a $50.00 non-refundable fee if picked up, or payment of a $60.00 non-refundable fee, if mailed or no payment to CITY if obtained from the CITY website at http://www.cityofgoleta.org/i-w ant-to/view/city-bid-opportunities.

The work includes all labor, material, supervision, plant , and equipment necessary to construct
and deliver a finished 2022–2023 Pavement Rehabilitation Project. Work includes placement of asphalt concrete (AC) pavement materials such as ARHM pavement overlay, AC mill and fill, and slurry seal; pulverizing, treating, removal and disposal of AC roadway section; replacement and compaction of subsurface material; setup and maintenance of traffic control systems; construction of concrete curb ramps & gutters, placement of crushed aggregate base and AC pavement; replacement of traffic striping and markings; and clean-up of project area; and other related work as necessary to provide a complete project. The contract period is Fifty (50) Working Days for the Base Bid, Cannon Green Neighborhood, consisting of Cannon Green Drive (Phelps Road to Hollister Avenue), Chapman Place (Cannon Green Drive to End), Davenport Road (West End Cul- De-Sac to East End Cul -De-Sac), Elmhurst Place (West End Cul-De-Sac to East End Cul -De- Sac), Freeman Place (West End Cul-De-Sac to East End Cul-De-Sac), Greensboro Street (East End Cul-De-Sac to Cannon Green Drive), and Hillsboro Street (Cannon Green Drive to East End Cul-De-Sac), Hillsboro Way (Hillsboro Street to Cul -De-Sac), Lowell Way (Hollister Avenue to Lowell Way), Lowell Way (West End Cul -De-Sac to East End Cul -De-Sac); Los Carneros Way (Calle Real to Cathedral Oaks Road); and Storke Road (Bollay Drive to Hollister Avenue); and additional days for Bid Alternates as follows:

Alternate Location # of Working
Days
Alternate A Covington Neighborhood consisting of Camino Caseta, Caseta Way, Camino Laguna Vista, Camino Talavera,
Camino Venturoso, Camino Viviente, Caroldale Lane,
Covington Way
Twenty-five
(25)
Alternate B Padova Drive (Salisbury Avenue to San Rossano Drive) Ten (10) Alternate C Padova Drive (Alpine Drive to Alameda Avenue) Ten (10) Alternate D Armstrong Road (Reed Court to Mills Way) Ten (10) Alternate E Hollister Avenue (West End to Cathedral Oaks Blvd) Five (5) Alternate F Newport Drive, Palos Verdes Drive Ten (10)
Alternate G Phelps Road (Pacific Oaks Road to Storke Road) Twenty-five (25)
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 51 2022–2023 PAVEMENT REHABILITATION PROJECT

A-2

Alternate H Phelps Road (Storke Road to East End) Ten (10) Alternate I Cathedral Oaks Blvd (Evergreen Drive to Alameda Avenue) Twenty (20) Alternate J Tree Root Repairs – Various Streets Five (5) Alternate K Storke Road (Hollister Avenue to US 101) Ten (10)

A Pre-Bid Meeting is not scheduled for this project.

Bidders must be registered on the City of Goleta’s PlanetBids portal in order to receive addendum notifications and to submit a bid. Go to PlanetBids for bid results and awards.

It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.

The bid must be accompanied by a bid security in the form of a money order, a certified cashier’s check, or bidder’s bond executed by an admitted surety, made payable to CITY. The bid security shall be an amount equal to ten percent (10%) of the total annual bid amount included with their proposals as required by California law.

Note: All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) lowest bidders must be mailed to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope and be received or postmarked within three (3) City business days after the bid due date and time for the bid to be considered. The sealed envelope should be plainly marked on the outside, “SEALED BID SECURITY FOR 2022-2023 Pavement Rehabilitation Project.”
The Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR) per California Labor Code Section 1771.4, including prevailing wage rates and apprenticeship employment standards. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The CITY hereby affirmatively ensures that all business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract.

A contract may only be awarded to the lowest responsive and responsible bidder that holds a valid Class “A” Contractor’s license, Class “C” Electrical specialty, or specialty licensing in accordance with the provisions of the California Business and Professions Code.

The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bon ding requirements, as defined in Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.

Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the DIR. No Bid will be accepted, nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the DIR to perform public work.

If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 52 2022–2023 PAVEMENT REHABILITATION PROJECT

A-3

registration with the DIR for the duration of the Project. Failure to provide proof of the contractor’s current registration pursuant to Labor Code Section 1725.5 may result in rejection of the bid as non-responsive.

Pursuant to Public Contract Code section 22300, the successful bidder may substitute certain securities for funds withheld by CITY to ensure performance under the Contract or, in the alternative, request the CITY to make payment of retention to an escrow agent.

Any protest to an intended award of this contract shall be made in writing addressed to the City Clerk prior to the award. Any protest may be considered and acted on by the City Council at the time noticed for award of the contract. To request a copy of the notice of agenda for award, please contact the City Clerk (805) 961- 7505 or register on the CITY’ s website (www.cityofgoleta.org).

For information relating to the details of this Project and bidding requirements contact Debbie Talarico in writing at [email protected].

Published:

Santa Barbara Independent: May 19, 2022, and June 2, 2022

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 53 2022–2023 PAVEMENT REHABILITATION PROJECT

B-1

SECTION B BIDDING INSTRUCTIONS

1. DEFINITIONS. Unless provided otherwise, the definitions in the contract documents are applicable to all bidding documents.

1.1 “A ddenda” means written or graphic instruments issued by the City before the bid deadline that modify or interpret the bidding documents by additions, deletions, clarifications, or corrections.

1.2 “Alternate” means an amount stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents as Alternate Work, to be added or deducted from the Total Base Bid, which shall be the Contractor’s responsibility if the City accepts the Alternate Bid Item.

1.3 “Bid Deadline” means the date and time designated in the notice inviting sealed bids as the last date and time for receipt of bids, as may be revised by addenda.

1.4 “Bidder” means a person or firm that submits a bid.

1.5 “ Bidding/Contract Documents” means the Contract, Addenda, Notice Inviti ng Sealed Bids, bidding instructions, Bid (including documentation accompanying the Bid and any post -bid documentation submitted prior to the Notice of Completion) when attached as an exhibit to the Contract, the Bonds, permits from jurisdictional regulatory agencies, Special Provisions, Plans, Standard Plans, Standard Specifications, Reference Specifications, Change Orders, and Supplemental Agreements.

1.6 “Contract Price” means the total aggregate amount, including alternates, of the Contractor’s bid price based on the estimated quantities listed in the Bidding Sheet as set forth in the award of the Contract approved by the City Council, subject to adjustment for variances in quantities and changes pursuant to Change Orders executed in accordance with the Contract Documents.

1.7 “Inspector” means the person designated by the engineer to ensure specification compliance.

1.8 “Total Base Bid” means the sum stated in the bid for which bidder offers to perform the Work described in the bidding documents, but not including alternates.

1.9 “ Unit or Contract Unit Price” means an amount entered in the bid by bidder or a “Contract Item” price established by the City in the bid, as a price per unit of measurement for payment for materials, equipment or services including taxes, supervision, overhead and profit for a portion of the work described in the Contract Documents.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 54 2022–2023 PAVEMENT REHABILITATION PROJECT

B-2

2. BIDDER’S REPRESENTATIONS. By making its bid, bidder represents that:

2.1 Bidder has read, understood, and made the bid pursuant to the requirements in the Contract Documents.

2.2 The Bidder, at its sole cost and expense, has carefully examine d the Contract Documents and visited the Project site to become fully acquainted with the loc al site conditions affecting the Work to be performed including transportation, disposal, handling, and storage of materials.

2.3 The bid and the Contract Unit Prices bid are based upon the labor, materials, equipment, and systems required by the Contract Documents.

2.4 Bidder and all subcontractors, regardless of tier, have the appropriate registrations and current licenses issued by the State of California Contractor’s State License Board and Department of Industrial Relations (DIR) for the Work to be performed.

If bidder is a joint venture, the bidder will have a joint venture license appropriate for the performance of the Work, and each member of the joint venture will likewise have the appropriate license. Business and professions code §§ 7000- 7191 establish licensing requirements for contractors . If a bidd er, that is a specialty contractor, submits a bid involving 3 or more specialized building trades, the Work of which is more than incidental and supplemental to the performance of the Work for which bidder holds a specialty contractor license, bidder must also hold either (1) a specialty contractor “C” license in each such trade or (2) a general engineering contractor “A” license. This requirement is applicable whether or not bidder lists a subcontractor for each such trade.

2.5 Bidder shall have the expertise, including the Responsible Managing Officer (RMO) for the Contractor Company, demonstrating a minimum of three (3) years' experience successfully performing projects of the same type, magnitude, and character of the work bid, and financial capacity to perform and complete all obligations under the Contract Documents . The person executing the bid form is duly authorized and empowered to execute the bid form on bidder’s behalf.

2.7 Bidder is aware of and, if awarded the contract, will comply with legal requirements in its performance of the Work.

2.8 Bidder is aware of and, if identified as the apparent lowest responsible bidder, would be required to pay City business license fee(s).

2.9 Bidder shall not damage or endanger and shall preserve and protect adjacent properties.

2.10 B idder has familiarized itself with the staging and material storage constraints of the Project site and surrounding buildings and will confine its staging and storage operations to approved areas.

2.11 Bidder will coordinate its construction activities with the other contractors and utility companies performing work on the Project site, if any, including, but not limited to, any separate contractor retained by the City.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 55 2022–2023 PAVEMENT REHABILITATION PROJECT

B-3

2.12 Bidder has checked the figures set forth in the bid schedule and understands that neither the City nor any officer or employee therefore will be responsible for any misunderstandings, errors, or omissions on the part of the Bidder in submitting its Bid. The failure of a Bidder to receive or examine any of the Bidding Documents or to inspect the site shall not relieve such Bidder from any obligation with respect to the Bid, the Contract, or the Work required under the Contract Documents.

3. CONTRACT DOCUMENTS.

3.1. Bidders may obtain complete sets of the Contract Documents from PlanetBids, the City of Goleta website, or the City’s Public Works Department for the sum stated in the notice inviting sealed bids.

3.2. Bidders will use a complete set of Contract Documents in preparing bids.

3.3. The City makes copies of the Contract Documents available, on the above terms, for the sole purpose of obtaining bids for the Work and does not confer a license or grant permission for any other use of the Contract Documents.

3.4. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Bidding Documents.

4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS.

4.1. Before submitting its bid, bidder will carefully study and compare the various documents comprising the Contract Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the bid is submitted; will examine the project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City ’s representative errors, inconsistencies, or ambiguities discovered. The drawings and specifications contained in these Contract Documents do not constitute a representation or warranty that any conditions shown therein actually exist . All soil and test hole data, groundwater elevations, and soil analyses shown on the Plans or included in the Special Provisions apply only at the location of the test holes and to the depths indicated.

4.2. Bidder requests for clarification or interpretation of the Contract Documents will be addressed to the City’s representative at least five (5) calendar days before the bid deadline.

4.3. Clarifications, interpretations, corrections, and changes to the Contract Documents will only be made by addenda. Purported clarifications, interpretations, corrections, and changes to the Contract Documents made in any other manner will not be binding and bidders will not rely upon them.

5. P RODUCT SUBSTITUTIONS. No requests for product substitutions will b e considered before award of contract unless requested through the Request for Information (RFI) process so that all bidders will be informed. Bidders wishing to obtain authorization for an or equal substitution of an equivalent material, product or equipment, shall submit all requests for or equal substitution using the form DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 56 2022–2023 PAVEMENT REHABILITATION PROJECT

B-4

included as Attachment A to these Bidding Instructions, together with data substantiating Bidder’s representation that the non- specified item is of equal quality to the item. Requests for product substitutions not handled through the RFI process will only be considered af ter award of the contract and in the manner provided for in the contract documents. Authorization of an equal substitution of equivalent materials is solely within the discretion of the City and, if given, shall be made by Addendum or Change Order issued by the City. Bids shall not be based on any or equal substitution request that has not been authorized in writing by City Addendum. In the absence of a written Addendum authorizing a pre-Bid or equal substitution request, the request shall be deemed denied.

6. SUBCONTRACTORS.

6.1. Each bidder will list in the bid form all first-tier subcontractors that will perform work, labor or render such services in excess of ½ of one percent of the total bid or $10,000, whichever is greater. The bid form contains spaces for the following information when listing subcontractors: (1) work activity; (2) name of subcontractor; (3) city of subcontractor’s business location; (4) Calif ornia contractor’s license number , and (5) DIR public works contractor registration number. An inadvertent error in listing the California contractor ’s license number or public works contractor registration number shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive if the corrected contractor's license number is submitted to the City by the Bidder within 24 hours after the bid opening and provided the corrected contractor's license number corresponds to the submitted name and location for that subcontractor. Failure to list any of these other items on the bid form will result in the City treating the bid as if no subcontractor was listed for the work and that bidder represents to the City that it is fully qualified to perform that portion of the Work and will so perform such Work.

6.2. S ubstitution of subcontractors after the bid deadline who are listed in the bid form will only be allowed with the City ’s written consent and in accordance with California law.

7. ADDENDA.

7.1. Before the Bid Deadline, the City may modify the Work, the Bidding Documents or any portion(s) thereof by the issuance of written addenda. Addenda will be in writing and issued only by the City.

7.2. Bidders must b e registered on the City’s PlanetBids portal to receive addendum notifications. Addenda will be posted on the PlanetBids portal.

7.3. Copies of addenda will be made available for inspection at the City’s Public Works Department.

7.4. The City will issue addenda so that they are received by prospective bidders not less than three (3) business days before the bid deadline. Addenda that withdraw the request for bids or postpone the bid deadline may be issued any time before the bid deadline.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 57 2022–2023 PAVEMENT REHABILITATION PROJECT

B-5

7.5. Each bidder is responsible for ensuring that it has received all issued addenda before submitting a bid. All bidders are required to acknowledge and confirm receipt of each and every addendum on PlanetBids. Failure to acknowledge all Addenda may result in a Bid being deemed nonresponsive and not eligible for award of the Contract.

8. NOT USED

9. FORM AND STYLE OF BIDS.

9.1. Bids will be submitted on the bid form included with the Contract Documents. Bids not submitted on the City’s bid form will be rejected. All blanks on the bid form will be filled in legibly.

9.2. Bidder’s failure to submit a price for any alternate or unit price will result in the bid being considered as non-responsive. If alternates are called for and no change in the lump sum base bid is required, enter “no change.”

9.3. Each bidder must fill out the “bidders statement of past contract disqualifications” form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The bidder must explain the circumstances of each disqualification.

9.4. Bidder will make no stipulations on the bid form nor qualify the bid in any manner.

9.5. The bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the bidder (if awarded the contract) specifically agrees to construct a completed Work ready for the use and in the manner which is intended.

9.6. The bid form will be signed by a person or persons legally authorized to bind bidder to a contract. Bidder’s representative will sign and date the declaration of eligibility to contract included in the bid form. Failure to sign and date the declaration will cause the bid to be rejected.

10. BID SECURITY.

10.1. Each bid must be accompanied by bid security, in the amount of 10% of the Total Base Bid, including alternates, on the base Contract Work, as security for bidder’s obligation to enter into a contract with the City on the terms stated in the bid form and to furnish all items required by the Contract Documents.

All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) apparent lowest bidders must be mailed to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope and be received or postmarked within three (3) City business days after the bid due date and time for the bid to be considered.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 58 2022–2023 PAVEMENT REHABILITATION PROJECT

B-6

The sealed envelope should be plainly marked on the outside identifying the names as shown in the notice inviting sealed bids.

10.2. If the apparent lowest responsible bidder fails to sign the contract and furnish all items required by the bidding documents within the time limits specified in these bidding instructions, the City may reject such bidder and select the next apparent lowest responsible bidder until all bids have been exhausted or the City may reject all bids. In the event the bid is rejected, such bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the bid security, between the amount of the disqualified bid and the larger amount for which the City procures the Work. The City may also use the bid security to cover the cost of rebidding the project.

10.3. If a bid bond is submitted and an attorney-in-fact executes the bid bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the bid bond. The surety issuing the bid bond must be admitted to provide surety within the State of California.

10.4. The City will retain the bid security until the occurrence of one of the following:

10.4.1 All items required by the bidding documents have been furnished and the contract has been signed by the successful bidder and the City.

10.4.2 The specified time has elapsed during which bids may be withdrawn.

10.4.3 All bids have been rejected.

11. BID DELIVERY.

11.1 The bid form, bid security, and all other documents required to be submitted with the bid must be submitted via electronic transmission on the City of Goleta PlanetBids portal site.

11.2 Bidders must be registered on the City of Goleta’s PlanetBids portal in order to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.

11.3 Bid Security shall be submitted in accordance with Section 10. “Bid Security” above and per the notice inviting sealed bids.

12. MODIFICATION OR WITHDRAWAL OF BID.

12.1. Bids may not be modified, withdrawn, or canceled within one hundred twenty (120) days after the bid deadline unless otherwise provided in any supplementary instructions to bidders. The bidder shall be prohibited from further bidding on the project and the bid bond shall be forfeited. The City, at its discretion, may award the bid to the next responsive and responsible bidder. In the event the next bidder refuses to enter into the contract, that bidder’s bid bond shall then be forfeited.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 59 2022–2023 PAVEMENT REHABILITATION PROJECT

B-7

13. OPENING OF BIDS.

13.1 Bids submitted in the manner required by these instructions and received on or before the bid deadline will be opened publicly via PlanetBids.

14. EVALUATION AND REJECTION OF BIDS.

14.1. Bidders will be evaluated for responsiveness and responsibility based on bid proposal information provided in the bid documents under “designation of subcontractors” and bidder’s references.”

14.2. A responsive Bid is a Bid that conforms, in all material respects, to these Instructions to Bidders. Non-responsive Bids will be rejected.

14.3. A responsible bidder means a bidder who has demonstrated the attributes of trustworthiness, quality, fitness, capacity, and experience to satisfactorily perform fully the requirements of the Contract Bidding Documents and the moral and business integrity and reliability that will assure good faith performance in the sole discretion of the County. Any determination of a bidder’s non-responsibility by the City shall be based on the fitness and capacity of the bidder to satisfactorily perform the obligations of the Contract, whether or not the bidder is qualified to perform those obligations, whether or not the bidder is trustworthy, and such other bases as may be relevant.

14.4. In addition to other provisions of the Bidding Documents, upon the request of the City, a bidder whose Bid is under consideration for the award of the Contract shall promptly subm it satisfactory evidence to Ci ty showing the bidder’s financial resources, experience in the field, and organization and other factors evidencing bidder’s ability to successfully execute and complete the Contract.

14.5. The City reserves the right to reject any or all bids and to waive discrepancies , irregularities, informalities, or any other error in the bid or bidding, when to do so seems to best serve the public interest. The right of the City to waive errors applies even if the Bidding Documents state that a discrepancy, irregularity, informality, or other error make a bid nonresponsive, so long as the error does not constitute a material error. The City reserves the right, in its sole discretion, to: judge the bidder’s representations as stated in the Bid forms and any post-Bid information to determine whether or not bidder is qualified to perform the Work; be the sole judge regarding the suitability of the products, services, or supplies offered; to not purchase all items or the full quantity of each item listed in the Bid Item List; reject any or all Bids; waive any deficiencies, irregularities, or informalities in any Bids or in the bidding process; modify, cancel, or withdraw the Notice Inviting Sealed Bids; issue a new Notice Inviting Sealed Bids; suspend or abandon the Project; seek the assistance of outside technical experts in Bid evaluation; require a bidder to provide a guarantee (or guarantees) of the Contract by a third party; and not issue a Notice to Proceed after execution of the Contract. In submitting a Bid in response to the Notice Inviting Sealed Bids, the bidder is specifically acknowledging the City holds these rights. The Noti ce Inviting Sealed Bids does not commit the Ci ty to enter into a Contract, to reject, in its sole discretion, all Bids, nor does it obligate the City pay for any costs incurred by bidders in preparation and submission of a DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 60 2022–2023 PAVEMENT REHABILITATION PROJECT

B-8

Bid or in anticipation of a Contract . By submitting a Bid, the bidder disclaims any right to be paid for such costs.

14.6. The City may reject any bid not accompanied by the required bid security or any other item required by the bidding documents, or a bid which is in any other way materially incomplete, irregular or not responsive to the bid request in the sole determination of the City.

15. AWARD.

A. The City may retain all bids for a period of one hundred twenty (120) days for examination and comparison, and to delete any portion of the Work from the contract.

B. The City may waive nonmaterial irregularities in a bid and will accept the lowest responsive bid from a responsible bidder as determined by the City.

C. The City will determine the low bidder on the basis of the total bid price in words on the bidding sheet as described on the bidding sheet.

D. City Staff will identify the apparent lowest responsive and responsible bidder and notify such bidder within one hundred tw enty (120) days (unless the number of days is modified in any Addendum issued to bidders) after the Bid Deadline. Within fifteen (15) days after receiving the City’s written notice that bidder was identified as the apparent lowest responsible bidder, bidder will submit to the City all of the following items as required by the City:

15.4.1 Two originals of the contract signed by bidder.

15.4.2 One original of the payment bond.

15.4.3 One original of the performance bond.

15.4.4 Certificates of insurance and additional insured endorsements on forms provided by the city.

15.4.5 Copy of current city of Goleta business license certificate.

15.4.6 Names of all subcontractors, with their DIR registration number, license numbers, addresses, telephone number, facsimile number and trade on bidders’ company stationery. Evidence, as required by the city, of the reliability and responsibility of the proposed subcontractors such as statements of experience, statements of financial condition, and references.

E. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 61 2022–2023 PAVEMENT REHABILITATION PROJECT

B-9

1725.5 at the time the contract is awarded. This Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.

F. If bidder submits the two original signed contracts and all other items within fifteen (15) days after receiving the City’s notification, and all such items comply with the requirements of the bidding documents, the City will submit the bid to the City Council for award of Contract. Following City Council Award of Contract, the City will sign the contract and return a signed copy of the contract to bidder

16. NOTICE OF INTENT TO AWARD CONT RACT. Following the opening of bids and determination of the lowest responsible Bidder, the City will issue a notice of intent to award the Contract, identifying the Bidder to whom the City intends to award the Contract. The award of the Contracts shall be made by the City Council.

17. PUBLIC RECORDS. City seeks to conduct its business openly. Upon identification of the lowest responsive and responsible bidder and upon notifying such bidder, Bids shall be regarded as public, with the exception any elements of each Bid that are identified by the Bidder as business or trade secrets and plainly marked as “trade secret,” “confidential,” or “proprietary.” Each element of a Bid which a Bidder desires not to be considered public must be clearly marked as set forth above; any blanket statement (i.e. regarding entire pages, documents, or other, non- specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If City receives a request from a third party to make a Bid available for inspection or copying, the City will notify the Bidder of the request. If a Bidder instructs the City that the information is not to be released, City will withhold the information, provided, the Bidder expeditiously seeks a protective order from a court of competent jurisdiction to prevent such release. If disclosure is required by law (despite the Bidder’s reques t for confidentiality), the City shall not in any way be liable or responsible for the disclosure of such records or part thereof.

18. BID PROTEST. Any registered Bidder may file a protest provided that each and all of the following are complied with:

18.1. The bid protest is in writing;

18.2. Protests based upon alleged defects or improprieties in the Bidding Documents are filed with the City prior to the Bid Deadline;

18.3. All other protests are filed and received by the City not more than five (5) calendar days following the date of City’s Notice of Intent to Award the Contract; and

18.4. The written bid protest sets forth, in detail, all grounds for the bid protest, including without limitation all facts, supporting documentation, legal authorities and argument in support of the grounds for the bid protest. All factual contentions must be supported by competent, admissible and credible evidence.

18.5. Any matters not set forth in the written bid protest shall be deemed waived. Any bid protest not conforming to the foregoing shall be rejected by the City as invalid.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 62 2022–2023 PAVEMENT REHABILITATION PROJECT

B-10

This Page Intentionally Left Blank
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 63 2022–2023 PAVEMENT REHABILITATION PROJECT

B-11

ATTACHMENT A – BIDDING INSTRUCTIONS

OR EQUAL SUBSTITUTION FORM

Project:

Location:

TO:

FROM:

1. Section, Paragraph and Page Number of Specification or Drawing to which this Request applies:

2. Item specified for which substitution is requested:

N
ame or Brand:

Manufacturer:

Catalog No.:

3. The proposed substitution is:

Name or Brand:

Manufacturer:

Catalog No.:

4. Contractor is required to provide product data for the proposed substitution consisting of the description of the product or item, reference standards and performance test data, together with substantiating data, supporting the claim that the non-specified product is equal to that specified. No substitution request will be considered by the City without a completed Substitution Request form and substantiating data. Contractor shall attach hereto complete technical data, including technical information, complete manufacturer’s catalogs, brochures and drawings, certified laboratory test reports and samples as applicable for the proposed substitution, installation and operating instructions, manufacturing warranties and other descriptive material.

5. R
easons for substitution request:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 64 2022–2023 PAVEMENT REHABILITATION PROJECT

B-12

6. Detailed comparison of significant qualities and properties (size, weight, durability, performance and similar characteristics) including the visual effect where applicable, for the proposed substitution in comparison with original requirements includes (list detailed comparison with supporting data, use separate sheets if required):

7. Installation changes and changes to Drawings and Specifications required by the proposed substitution are (list all required changes, use separate sheets if required):

8. Does this substitution affect dimensions shown on Drawings?

Yes No

If yes, clearly indicate changes on each Drawing by Sheet No.:

9. List the effects of the proposed substitution on other parts of the Work or on separate contracts, including required changes in Drawings, dimensions, engineering and detailing costs and effect on other trades.

10. What effect does substitution have on applicable code requirements?

11. Identify differences between the proposed substitution and the specified item.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 65 2022–2023 PAVEMENT REHABILITATION PROJECT

B-13

12. Attach a copy of manufacturer’s warranty, Manufacturer’s guarantees and warranties of proposed and specified items are:

Same
Different
(Explain on attachment.)
Manufacturer shall provide a letter stating the fitness for intended use, an d performance equivalence with the specified item.

13. List the name and address of three similar projects (not necessarily installed by Contractor) on which the proposed product was used and date of installation:

(1) N ame of Project:

Address:

Date of Installation:

(2) N
ame of Project:

Address:

Date of Installation:

(3) N
ame of Project:

Address:

Date of Installation:

14. Use of the substitution will cause the Contract Time to be:

Same
Different
(Explain on attachment.)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 66 2022–2023 PAVEMENT REHABILITATION PROJECT

B-14

15. Use of the substitution will affect the critical path of the Construction Schedule as follows (identify any proposed adjustment to the Contract Time):

16. R eduction in the Contract Sum of $ will result from use of the substituted item.

17. Estimated cost of any engineering, design or agency fees required for work of all trades directly or indirectly af
fected by the substitution is: $ .

18. The date by which City must accept this Request in order for the time and cost estimates in Paragraphs 14 and 16 to remain valid is:
.

19. C ontractor Affidavit . The undersigned, having thoroughly investigated the proposed substitution represents, certifies and declares, under penalty of perjury under the laws of the State of California that:
(1) Contractor has personally investigated the proposed substitution and determined that it is equal or s
uperior in all respects to the material, product, thing or service specified except as specifically noted: ;
(2) Contractor will provide the same warranty and correction responsibility for the proposed substitution that the Contractor would have provided for that specified; (3) The cost data presented is complete and includes all related costs under this Contract except any redesign costs and agency fees;
(4) Contractor will indemnify City from and pay all redesign, engineering, detailing, special inspection costs and agency fees caused by the use of this substitution; (5) Contractor will coordinate the installation of the accepted substitution, making such changes as may be required for the Work to be complete in all respects. (6) Contractor waives all claims for additional costs relating to the substitution which may subsequently become apparent; and
(7) Contractor assumes all responsibility for and will indemnify City from and pay all direct or indirect costs and/or time impacts as a result of the use of the substitution.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 67 2022–2023 PAVEMENT REHABILITATION PROJECT

B-15

Executed this _________ day of ________ 20__, at ___________, California.

(Type or print name)
Submitted by:

(Firm)

(Address)

For use by City:
___ Accepted ___ Accepted as noted

___ Not Accepted ___ Rejected as late

(By)

(Date)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 68 2022–2023 PAVEMENT REHABILITATION PROJECT

B-16

This Page Intentionally Left Blank
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 69 2022–2023 PAVEMENT REHABILITATION PROJECT

C-1

SECTION C PROPOSAL

BID PROPOSAL
FOR
2022–2023 PAVEMENT REHABILITATION PROJECT

TO THE CITY OF GOLETA (“City”):

In accordance with City’s Notice Inviting Sealed Bids, the undersigned Bidder hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the 2022–2023 Pavement Rehabilitation Project as set forth in the Plans, Specifications, and Contract Documents, and to perform all Work in the manner and time prescribed therein.

Bidder declares that this Bid is based upon careful examination of the Work site, Plans, Specifications, Bidding Instructions, and all other Contract Documents. If this Bid is accepted for award, Bidder agrees to enter into a contract with City at the unit and/or lump sum prices set forth in the following Bid Schedule. Bidder understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to City of the Bid Security accompanying this Bid.

Bidder understands that a Bid is required for the entire Work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing Bids, and that final compensation under the Contract will be based upon the actual quantities of Work satisfactorily completed. THE CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT as described in these Contract Documents . It is agreed that the unit and/or lump sum prices bid include all overhead, profit, appurtenant expenses, taxes, royalties, and fees . In the case of discrepancies in the amounts bid, unit prices shall govern over extended amount, and words shall govern over figures.

If awarded the Contract, the undersigned further agrees that in the event of the Bidder’s default in executing the Contract and filing the necessary bonds and insurance certificates WITHIN FIFTEEN (15) WORKING DAYS, not including Saturdays, Sundays and legal holidays, after the City has mailed notice of the award of contract to the Bidder, the proceeds of the Bid Security accompanying this Bid shall become the property of the City and this Bid and the acceptance hereof may, at the City’s option, be considered null and void.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 70 2022–2023 PAVEMENT REHABILITATION PROJECT

C-2

BID PROPOSAL
FOR
2022–2023 PAVEMENT REHABILITATION PROJECT

Bids will be received before 3:00 P.M., Thursday, June 16, 2022, at the City of Goleta, City Hall Building, 130 Cremona Drive, Suite B, Goleta, CA 93117.

Questions regarding the Contract Documents, Specifications, Proposal or other Bidding Documents, shall be submitted in writing and emailed to [email protected].

The Project insurance requirements are per the Caltrans Standard Specifications, as modified by the City General Provisions contained herein.

Contract Time: 50 Working Days for the Base Bid, Cannon Green Neighborhood, consisting of Cannon Green Drive (Phelps Road to Hollister Avenue), Chapman Place (Cannon Green Drive to End), Davenport Road (West End Cul-De-Sac to East End Cul -De-Sac), Elmhurst Place (West End Cul-De-Sac to East End Cul -De-Sac), Freeman Place (West End Cul -De-Sac to East E nd Cul-De-Sac), Greensboro Street (East End Cul -De-Sac to Cannon Green Drive), and Hillsboro Street (Cannon Green Drive to East End Cul-De-Sac), Hillsboro Way (Hillsboro Street to Cul-De- Sac), Lowell Way (Hollister Avenue to Lowell Way), Lowell Way (West End Cul-De-Sac to East End Cul-De-Sac); Los Carneros Way (Calle Real to Cathedral Oaks Road); and Storke Road (Bollay Drive to Hollister Avenue); and additional days for Bid Alternates as follows:

Alternate Location # of Working
Days
Alternate A Covington Neighborhood consisting of Camino Caseta, Caseta Way, Camino Laguna Vista, Camino Talavera,
Camino Venturoso, Camino Viviente, Caroldale Lane,
Covington Way
Twenty-five
(25)
Alternate B Padova Drive (Salisbury Avenue to San Rossano Drive) Ten (10) Alternate C Padova Drive (Alpine Drive to Alameda Avenue) Ten (10) Alternate D Armstrong Road (Reed Court to Mills Way) Ten (10) Alternate E Hollister Avenue (West End to Cathedral Oaks Blvd) Five (5) Alternate F Newport Drive, Palos Verdes Drive Ten (10)
Alternate G Phelps Road (Pacific Oaks Road to Storke Road) Twenty-five (25)
Alternate H Phelps Road (Storke Road to East End) Ten (10) Alternate I Cathedral Oaks Blvd (Evergreen Drive to Alameda Avenue) Twenty (20) Alternate J Tree Root Repairs – Various Streets Five (5) Alternate K Storke Road (Hollister Avenue to US 101) Ten (10)

Time is of the essence in the performance of this contract.

BIDDER SHALL COMPLETE:

Bidder’s Name
Street Address
City State Zip Code
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 71 2022–2023 PAVEMENT REHABILITATION PROJECT

C-3
Telephone Number Fax Number
E-mail

The following Addenda are acknowledged: Number Dated Initials (Bidder must fill in number and date of each
Addendum or may enter the word “none” if
appropriate)

BIDDERS Signature DATE

Tax I.D. Number
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 72 2022–2023 PAVEMENT REHABILITATION PROJECT

C-4
2022–2023 PAVEMENT REHABILITATION PROJECT

BIDDING SHEET (Page 1 of 16)
The cost of all labor, material and equipment necessary for the completion of the work itemized, even though not shown or specified, shall be included in the unit or lump sum prices for the various items shown herein.

The City further reserves the right to reject any or all bids, to waive any informality or irregularity in any bid or the bidding procedure, and to delete any items of work in the award of contract. The City's decision on the bid amount is final.

Bidders must bid on all items in the Bid Schedule including the Supplemental and Alternative Bid Items in order for their bids to be complete. The award of contract will be based on the lowest responsive Bid only. The lowest Bid will be determined based on the lowest bid price on the total Base Bid. The City retains the right to add to or deduct from the Contract any of the additive or deductive alternates included in the Bid Proposal.

In the case of unit basis items, the amount set forth under the "Item Total" column (total bid in words) shall be the product of the unit price bid and the estimated quantity for the item.

Bids on lump sum items are item totals. If a unit price of a lump sum item is entered and it differs from the item total, the item total prevails.

Entries are to be expressed in dollars or decimal fractions of a dollar. Symbols such as commas and dollar signs are ignored and have no significance in establishing unit price or item total.

Unit prices and item totals are interpreted by the number of digits and decimal placement. Do not round item totals or the total bid.

In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price prevails, except as provided in (a) or (b), as follows:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount of the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price; (b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one- tenth, or one- hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage- wise the unit price or item total in the City's Final Estimate of cost.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, t he bid may be deemed irregular. Likewise, if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irlar unless the project being bid has only a single item and a clear, readable total bid is provided. .

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 73 2022–2023 PAVEMENT REHABILITATION PROJECT

C-5
BIDDING SHEET (Page 2 of 16)

BASE BID SCHEDULE: Cannon Green Neighborhood

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
1 Mobilization, Bonds & Insurance 901-02 LS 1
2 Bicycle, Pedestrian & Traffic
Control 902-07 LS 1
3 Storm Water Pollution Control
Program 903-03 LS 1
4 AC (C2 PG 64-10) 910-04 TN 604
5 AC (D2 PG 64-10) 910-04 TN 113
6 ARHM (GG-D PG 64-16) 911-05 TN 2,177
7 Cold Plane & Remove 2-1/2" 906-06 SF 72,580
8 Cold Plane & Remove 2-3/4" 906-06 SF 72,183
9 6" Deep Lift Stabilization
(Allowance) 918-04 SF 7,238
10 Crack Seal & Type II Slurry Seal 920-04 TN 259
11 Remove & Replace 4" AC 918-04 SF 4,416
12 Remove & Replace 9" AC 918-04 SF 5,292
13 Prune & Remove Tree Roots 918-04 SF 2
14 Type A1 Keycut (See Plan and
Detail) 906-06 LF 1,760
15 Type B1 Keycut (See Plan and
Detail) 906-06 LF 86
16 Construct Caltrans Type A
Ramp 916-04 EA 7
17 Construct Caltrans Type B
Ramp 916-04 EA 1
18 Construct Caltrans Type C
Ramp 916-04 EA 6
19 Construct Caltrans Type CM
Ramp 916-04 EA 1
20 Construct Caltrans Median
Island Type C 916-04 EA 1
21 Remove & Replace Sidewalk 916-04 SF 1,864
22 Remove & Replace Curb &
Gutter 916-04 LF 566
23 Remove & Replace PCC
Spandrel 916-04 SF 18
24 Blue RPM @ Hydrant 914-04 EA 17
25 Monument Perpetuation 900-11 EA 17
26 Lower Manhole Cover 913-03 EA 8
27 Lower Water Valve Cover 913-03 EA 10
28 Lower Sewer Cleanout Cover 913-03 EA 1
29 Adjust Manhole Cover to Finish
Grade 913-03 EA 8
30 Adjust Water Valve Cover to
Finish Grade 913-03 EA 10
31 Adjust Sewer Cleanout Cover to
Finish Grade 913-03 EA 1

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 74 2022–2023 PAVEMENT REHABILITATION PROJECT

C-6
BIDDING SHEET (Page 3 of 16)

BASE BID SCHEDULE: Cannon Green Neighborhood (Continued)

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
32 Lower and Adjust Loop Detector
Covers 913-03 EA 5
33 Remove and Install Temporary
Traffic Loops 917-04 EA 37
34 Remove and Install Permanent
Traffic Loops 917-04 EA 37
35 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 1,119
36 Striping Detail #9 (Paint &
Markers) 914-04 LF 1,779
37 Striping Detail #21 (Paint &
Markers) 914-04 LF 164
38 Striping Detail #22 (Paint &
Markers) 914-04 LF 1,804
39 Striping Detail #27B (Paint &
Markers) 914-04 LF 23
40 Striping Detail #29 (Paint &
Markers) 914-04 LF 266
41 Striping Detail #32 (Paint &
Markers) 914-04 LF 208
42 Striping Detail #38 (Paint &
Markers) 914-04 LF 241
43 Striping Detail #38A (Paint &
Markers) 914-04 LF 869
44 Striping Detail #39 (Paint &
Markers) 914-04 LF 3,898
45 Striping Detail #39A (Paint &
Markers) 914-04 LF 1,576
46 Striping Detail #40 (Paint &
Markers) 914-04 LF 117
47 Arrow Type IV (L/R) (Paint) 914-04 EA 5
48 Bike w/ Person (Paint) 914-04 EA 5
49 Bike Lane Arrow (Paint) 914-04 EA 6
50 "25" Legend (Paint) 914-04 EA 1
51 "45" Legend (Paint) 914-04 EA 5
52 "KEEP" Legend (Paint) 914-04 EA 1
53 "CLEAR" Legend (Paint) 914-04 EA 1
54 "US 101" Legend (Paint) 914-04 EA 1
55 "SOUTH" Legend (Paint) 914-04 EA 1
56 "STOP" Legend (Paint) 914-04 EA 13

TOTAL BASE BID

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 75 2022–2023 PAVEMENT REHABILITATION PROJECT

C-7
BIDDING SHEET (Page 4 of 16)

BID ALTERNATE “A” SCHEDULE: Covington Neighborhood

Item # Item Pay
Ref Unit Quantity Unit
Cost Total Cost
A1 Mobilization, Bonds & Insurance 901-02 LS 1
A2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
A3 Storm Water Pollution Control
Program 903-03 LS 1
A4 AC (D2 PG 64-10) 910-04 TN 823
A5 ARHM (GG-D PG 64-16) 911-05 TN 2,683
A6 Crack Seal & Type II Slurry Seal 920-04 TN 121
A7 Remove & Replace 4" AC 918-04 SF 7,501
A8 Prune & Remove Tree Roots 918-04 SF 3,767
A9 Type A2 Keycut (See Plan and
Detail) 906-06 LF 14,930
A10 Type B2 Keycut (See Plan and
Detail) 906-06 LF 235
A11 Construct Caltrans Type A Ramp 916-04 EA 18
A12 Construct Caltrans Type C Ramp 916-04 EA 4
A13 Construct Caltrans Type F Ramp 916-04 EA 1
A14 Remove & Replace Sidewalk 916-04 SF 1,526
A15 Remove & Replace Curb & Gutter 916-04 LF 953
A16 Blue RPM @ Hydrant 914-04 EA 10
A17 Monument Perpetuation 900-11 EA 38
A18 Lower Manhole Cover 913-03 EA 29
A19 Lower Water Valve Cover 913-03 EA 30
A20 Lower Sewer Cleanout Cover 913-03 EA 2
A21 Adjust Manhole Cover to Finish
Grade 913-03 EA 29
A22 Adjust Water Valve Cover to Finish
Grade 913-03 EA 29
A23 Adjust Sewer Cleanout Cover to
Finish Grade 913-03 EA 2
A24 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 242
A25 12" Yellow Crosswalk Line (Paint) 914-04 LF 828
A26 24" Crosswalk Bars (Paint) 917-04 LF 78
A27 Striping Detail #21 (Paint & Markers) 914-04 LF 286 A28 Striping Detail #22 (Paint & Markers) 914-04 LF 2,320 A29 Shared Arrow Bicycle Marking
Legend (Paint) 914-04 EA 16
A30 "STOP" Legend (Paint) 914-04 EA 10
A31 "XING" Legend (Paint) 914-04 EA 7
A32 "SCHOOL" Legend (Paint) 914-04 EA 7
A33 "SLOW" Legend (Paint) 914-04 EA 6
TOTAL BID ALTERNATE “A”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 76 2022–2023 PAVEMENT REHABILITATION PROJECT

C-8
BIDDING SHEET (Page 5 of 16)

BID ALTERNATE “B” SCHEDULE: Padova Drive (Salisbury Avenue to San Rossano Drive)

Item # Item Pay
Ref Unit Quantity Unit
Cost Total Cost
B1 Mobilization, Bonds & Insurance 901-02 LS 1
B2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
B3 Storm Water Pollution Control
Program 903-03 LS 1
B4 AC (D2 PG 64-10) 910-04 TN 222
B5 ARHM (GG-D PG 64-16) 911-05 TN 831
B6 Remove & Replace Speed Hump 910-04 EA 3
B7 Type A1 Keycut (See Plan and
Detail) 906-06 LF 3,435
B8 Type B1 Keycut (See Plan and
Detail) 906-06 LF 260
B9 Construct Caltrans Type A Ramp 916-04 EA 13
B10 Remove & Replace Sidewalk 916-04 SF 1,120
B11 Remove & Replace Curb & Gutter 916-04 LF 417
B12 Blue RPM @ Hydrant 914-04 EA 2
B13 Monument Perpetuation 900-11 EA 18
B14 Lower Manhole Cover 913-03 EA 6
B15 Lower Water Valve Cover 913-03 EA 13
B16 Lower Sewer Cleanout Cover 913-03 EA 2
B17 Adjust Manhole Cover to Finish
Grade 913-03 EA 6
B18 Adjust Water Valve Cover to Finish
Grade 913-03 EA 13
B19 Adjust Sewer Cleanout Cover to
Finish Grade 913-03 EA 2
B20 6" Chevron Markings (Paint) 914-04 LF 216
B21 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 235
B22 12" Yellow Crosswalk Line (Paint) 914-04 LF 265
B23 Striping Detail #21 (Paint & Markers) 914-04 LF 112 B24 "STOP" Legend (Paint) 914-04 EA 6
B25 "AHEAD" Legend (Paint) 914-04 EA 2
TOTAL BID ALTERNATE “B”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 77 2022–2023 PAVEMENT REHABILITATION PROJECT

C-9
BIDDING SHEET (Page 6 of 16)

BID ALTERNATE “C” SCHEDULE: Padova Drive (Alpine Drive to Alameda Avenue)

Item # Item Pay
Ref Unit Quantity Unit
Cost Total Cost
C1 Mobilization, Bonds & Insurance 901-02 LS 1
C2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
C3 Storm Water Pollution Control
Program 903-03 LS 1
C4 AC (D2 PG 64-10) 910-04 TN 160
C5 ARHM (GG-D PG 64-16) 911-05 TN 599
C6 Prune & Remove Tree Roots 918-04 SF 104
C7 Type A1 Keycut (See Plan and
Detail) 906-06 LF 2,500
C8 Type B1 Keycut (See Plan and
Detail) 906-06 LF 240
C9 Construct Caltrans Type A Ramp 916-04 EA 14
C10 Remove & Replace Sidewalk 916-04 SF 1,427
C11 Remove & Replace Curb & Gutter 916-04 LF 412
C12 Monument Perpetuation 900-11 EA 19
C13 Lower Manhole Cover 913-03 EA 7
C14 Lower Water Valve Cover 913-03 EA 8
C15 Adjust Manhole Cover to Finish
Grade 913-03 EA 7
C16 Adjust Water Valve Cover to Finish
Grade 913-03 EA 8
C17 12" Yellow Crosswalk Line (Paint) 914-04 LF 633
C18 "STOP" Legend (Paint) 914-04 EA 4
C19 "XING" Legend (Paint) 914-04 EA 2
C20 "SCHOOL" Legend (Paint) 914-04 EA 2
C21 "SLOW" Legend (Paint) 914-04 EA 2
TOTAL BID ALTERNATE “C”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 78 2022–2023 PAVEMENT REHABILITATION PROJECT

C-10
BIDDING SHEET (Page 7 of 16)

BID ALTERNATE “D” SCHEDULE: Armstrong Road (Reed Court to Mills Way)

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
D1 Mobilization, Bonds & Insurance 901-02 LS 1
D2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
D3 Storm Water Pollution Control
Program 903-03 LS 1
D4 AC (D2 PG 64-10) 910-04 TN 208
D5 ARHM (GG-D PG 64-16) 911-05 TN 593
D6 Remove & Replace 4" AC 918-04 SF 5,580
D7 Type A2 Keycut (See Plan and
Detail) 906-06 LF 3,310
D8 Type B2 Keycut (See Plan and
Detail) 906-06 LF 195
D9 Construct Caltrans Type A Ramp 916-04 EA 14
D10 Remove & Replace Sidewalk 916-04 SF 880
D11 Remove & Replace Curb & Gutter 916-04 LF 431
D12 Blue RPM @ Hydrant 914-04 EA 3
D13 Monument Perpetuation 900-11 EA 16
D14 Lower Manhole Cover 913-03 EA 5
D15 Lower Water Valve Cover 913-03 EA 6
D16 Adjust Manhole Cover to Finish
Grade 913-03 EA 5
D17 Adjust Water Valve Cover to Finish
Grade 913-03 EA 6
D18 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 48
D19 "STOP" Legend (Paint) 914-04 EA 3
TOTAL BID ALTERNATE “D”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 79 2022–2023 PAVEMENT REHABILITATION PROJECT

C-11
BIDDING SHEET (Page 8 of 16)

BID ALTERNATE “E” SCHEDULE: Hollister Avenue (Cathedral Oaks Road to Gate at West End)

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
E1 Mobilization, Bonds & Insurance 901-02 LS 1
E2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
E3 Storm Water Pollution Control
Program 903-03 LS 1
E4 Crack Seal & Type II Slurry Seal 920-04 TN 164
E5 Remove & Replace 4" AC 918-04 SF 2,919
E6 Blue RPM @ Hydrant 914-04 EA 5
E7 Lower Manhole Cover 913-03 EA 13
E8 Lower Water Valve Cover 913-03 EA 40
E9 Adjust Manhole Cover to Finish
Grade 913-03 EA 13
E10 Adjust Water Valve Cover to Finish
Grade 913-03 EA 40
E11 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 97
E12 Striping Detail #21 (Paint & Markers) 914-04 LF 286 E13 Striping Detail #22 (Paint & Markers) 914-04 LF 1,646 E14 Striping Detail #27B (Paint &
Markers) 914-04 LF 30
E15 Striping Detail #29 (Paint & Markers) 914-04 LF 579 E16 Striping Detail #38 (Paint & Markers) 914-04 LF 525 E17 Striping Detail #39 (Paint & Markers) 914-04 LF 7,588 E18 Striping Detail #39A (Paint &
Markers) 914-04 LF 1,908
E19 Arrow Type IV (L/R) (Paint) 914-04 EA 7
E20 Bike w/ Person (Paint) 914-04 EA 3
E21 Bike Lane Arrow (Paint) 914-04 EA 3
E22 "STOP" Legend (Paint) 914-04 EA 7
E23 "AHEAD" Legend (Paint) 914-04 EA 1
TOTAL BID ALTERNATE “E”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 80 2022–2023 PAVEMENT REHABILITATION PROJECT

C-12

BIDDING SHEET (Page 9 of 16)

BID ALTERNATE “F” SCHEDULE: Newport Drive (Coronado Drive to Palos Verdes Drive) and Palos Verde Drive (West End to East End Cul-De-Sac)

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
F1 Mobilization, Bonds & Insurance 901-02 LS 1
F2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
F3 Storm Water Pollution Control
Program 903-03 LS 1
F4 AC (D2 PG 64-10) 910-04 TN 264
F5 ARHM (GG-D PG 64-16) 911-05 TN 886
F6 Remove & Replace 4" AC 918-04 SF 573
F7 Prune & Remove Tree Roots 918-04 SF 541
F8 Type A2 Keycut (See Plan and
Detail) 906-06 LF 3,255
F9 Type B2 Keycut (See Plan and
Detail) 906-06 LF 75
F10 Construct Caltrans Type A Ramp 916-04 EA 4
F11 Remove & Replace Sidewalk 916-04 SF 325
F12 Remove & Replace Curb & Gutter 916-04 LF 88
F13 Blue RPM @ Hydrant 914-04 EA 1
F14 Monument Perpetuation 900-11 EA 19
F15 Lower Manhole Cover 913-03 EA 6
F16 Lower Water Valve Cover 913-03 EA 7
F17 Adjust Manhole Cover to Finish
Grade 913-03 EA 6
F18 Adjust Water Valve Cover to Finish
Grade 913-03 EA 7
F19 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 48
F20 "STOP" Legend (Paint) 914-04 EA 1
TOTAL BID ALTERNATE “F”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 81 2022–2023 PAVEMENT REHABILITATION PROJECT

C-13

BIDDING SHEET (Page 10 of 16)

BID ALTERNATE “G” SCHEDULE: Phelps Road (Pacific Oaks Road to Storke Road)

Item # Item Pay
Ref Unit Quantity Unit
Cost Total Cost
G1 Mobilization, Bonds & Insurance 901-02 LS 1
G2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
G3 Storm Water Pollution Control
Program 903-03 LS 1
G4 AC (D2 PG 64-10) 910-04 TN 291
G5 ARHM (GG-D PG 64-16) 911-05 TN 1,088
G6 Remove & Replace 5" AC 918-04 SF 33,548
G7 Prune & Remove Tree Roots 918-04 SF 255
G8 Type A1 Keycut (See Plan and
Detail) 906-06 LF 4,480
G9 Type B1 Keycut (See Plan and
Detail) 906-06 LF 110
G10 Construct Caltrans Type A Ramp 916-04 EA 14
G11 Construct Caltrans Type C Ramp 916-04 EA 6
G12 Remove & Replace Sidewalk 916-04 SF 1,803
G13 Remove & Replace Curb & Gutter 916-04 LF 832
G14 Remove & Replace PCC Spandrel 916-04 SF 22
G15 Blue RPM @ Hydrant 914-04 EA 2
G16 Monument Perpetuation 900-11 EA 7
G17 Lower Manhole Cover 913-03 EA 9
G18 Lower Water Valve Cover 913-03 EA 10
G19 Adjust Manhole Cover to Finish
Grade 913-03 EA 9
G20 Adjust Water Valve Cover to Finish
Grade 913-03 EA 10
G21 6" Chevrons Markings (Paint) 914-04 LF 220
G22 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 340
G23 Striping Detail #22 (Paint & Markers) 914-04 LF 1,145 G24 Striping Detail #29 (Paint & Markers) 914-04 LF 45
G25 Striping Detail #38 (Paint & Markers) 914-04 LF 810 G26 Striping Detail #39 (Paint & Markers) 914-04 LF 5,950 G27 Striping Detail #39A (Paint &
Markers) 914-04 LF 750
G28 Arrow Type IV (L/R) (Paint) 914-04 EA 14
G29 Bike w/ Person (Paint) 914-04 EA 8
G30 "STOP" Legend (Paint) 914-04 EA 6
TOTAL BID ALTERNATE “G”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 82 2022–2023 PAVEMENT REHABILITATION PROJECT

C-14
BIDDING SHEET (Page 11 of 16)

BID ALTERNATE “H” SCHEDULE: Phelps Road (Storke Road to East End)

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
H1 Mobilization, Bonds & Insurance 901-02 LS 1
H2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
H3 Storm Water Pollution Control
Program 903-03 LS 1
H4 AC (D2 PG 64-10) 910-04 TN 155
H5 ARHM (GG-D PG 64-16) 911-05 TN 665
H6 Type A1 Keycut (See Plan and
Detail) 906-06 LF 2,810
H7 Type B1 Keycut (See Plan and
Detail) 906-06 LF 30
H8 Construct Caltrans Type A Ramp 916-04 EA 2
H9 Construct Caltrans Type CM Ramp 916-04 EA 9
H10 Remove & Replace Sidewalk 916-04 SF 713
H11 Remove & Replace Curb & Gutter 916-04 LF 280
H12 Remove & Replace PCC Spandrel 916-04 SF 39
H13 Blue RPM @ Hydrant 914-04 EA 2
H14 Lower Manhole Cover 913-03 EA 7
H15 Lower Water Valve Cover 913-03 EA 8
H16 Adjust Manhole Cover to Finish
Grade 913-03 EA 7
H17 Adjust Water Valve Cover to Finish
Grade 913-03 EA 8
H18 12" White Crosswalk/Limit Line
(Paint) 914-04 LF 300
H19 Striping Detail #22 (Paint & Markers) 914-04 LF 1,250 H20 Striping Detail #29 (Paint & Markers) 914-04 LF 45
H21 Striping Detail #39 (Paint & Markers) 914-04 LF 2,100 H22 Striping Detail #39A (Paint &
Markers) 914-04 LF 184
H23 Bike w/ Person (Paint) 914-04 EA 5
TOTAL BID ALTERNATE “H”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 83 2022–2023 PAVEMENT REHABILITATION PROJECT

C-15
BIDDING SHEET (Page 12 of 16)

BID ALTERNATE “ I” SCHEDULE: Cathedral Oaks Road (Evergreen Drive to Alameda Avenue)

Item # Item Pay Ref Unit Quantity Unit
Cost Total Cost
I1 Mobilization, Bonds & Insurance 901-02 LS 1
I2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
I3 Storm Water Pollution Control Program 903-03 LS 1
I4 AC C2 PG 64-10 910-04 TN 3,620
I5 ARHM (GG-D PG 64-16) 911-05 TN 1,508
I6 Pulverize 12" 912-07 SF 120,652
I7 Remove & Dispose 6-1/2" Pulverized
Material 906-06 SF 120,652
I8 Quicklime/Cement Treat 12" 912-07 SF 120,652
I9 Remove & Replace Overside Drain 921-06 EA 1
I10 Remove & Replace AC Berm 910-04 LF 2,400
I11 Remove & Replace 4" AC 918-04 SF 4
I12 6" Deep Lift Stabilization (Allowance) 918-04 SF 6,033 I13 Construct Caltrans Type A Ramp 916-04 EA 1
I14 Construct Caltrans Type B Ramp 916-04 EA 1
I15 Construct Caltrans Type C Ramp 916-04 EA 4
I16 Remove & Replace Sidewalk 916-04 SF 446
I17 Remove & Replace Curb & Gutter 916-04 LF 160
I18 Monument Perpetuation 900-11 EA 15
I19 Lower Manhole Cover 913-03 EA 1
I20 Lower Water Valve Cover 913-03 EA 9
I21 Adjust Manhole Cover to Finish Grade 913-03 EA 1
I22 Adjust Water Valve Cover to Finish
Grade 913-03 EA 9
I23 6" Chevrons Markings (Paint) 914-04 LF 495
I24 12" White Crosswalk/Limit Line (Paint) 914-04 FT 350 I25 Striping Detail #22 (Paint & Markers) 914-04 FT 400 I26 Striping Detail #29 (Paint & Markers) 914-04 FT 1,170 I27 Striping Detail #32 (Paint & Markers) 914-04 FT 1,982 I28 Striping Detail #38 (Paint & Markers) 914-04 FT 380 I29 Striping Detail #39 (Paint & Markers) 914-04 FT 1,000 I30 Striping Detail #39A (Paint & Markers) 914-04 FT 820 I31 Arrow Type IV (L/R) (Paint) 914-04 EA 8
I32 Bike w/ Person (Paint) 914-04 EA 7
I33 Bike Lane Arrow (Paint) 914-04 EA 7
I34 "XING" Legend (Paint) 914-04 EA 2
I35 "SCHOOL" Legend (Paint) 914-04 EA 2
I36 "SLOW" Legend (Paint) 914-04 EA 2
TOTAL BID ALTERNATE “I”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 84 2022–2023 PAVEMENT REHABILITATION PROJECT

C-16
BIDDING SHEET (Page 13 of 16)

BID ALTERNATE “J” SCHEDULE: Tree Root Repairs

Item # Item Pay
Ref Unit Quantity Unit
Cost Total Cost
J1 Mobilization, Bonds & Insurance 901-02 LS 1
J2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
J3 Storm Water Pollution Control
Program 903-03 LS 1
J4 Prune & Remove Tree Roots 918-04 SF 1,539
J5 Remove & Replace Curb & Gutter 916-04 LF 15
TOTAL BID ALTERNATE “J”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 85 2022–2023 PAVEMENT REHABILITATION PROJECT

C-17
BIDDING SHEET (Page 14 of 16)

BID ALTERNATE “K” SCHEDULE: Storke Road (Hollister Avenue to US 101 SB On-Ramp)

Item # Item Pay
Ref Unit Quantity Unit
Cost Total Cost
K1 Mobilization, Bonds & Insurance 901-02 LS 1
K2 Bicycle, Pedestrian & Traffic Control 902-07 LS 1
K3 Storm Water Pollution Control
Program 903-03 LS 1
K4 Remove & Replace 8" AC 918-04 SF 17,961
K5 Striping Detail #9 (Paint & Markers) 914-04 LF 2,707 K6 Striping Detail #27 (Paint & Markers) 914-04 LF 1,487 K7 Striping Detail #39A (Paint &
Markers) 914-04 LF 2,980
TOTAL BID ALTERNATE “K”

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 86 2022–2023 PAVEMENT REHABILITATION PROJECT

C-18
2022–2023 PAVEMENT REHABILITATION PROJECT

BIDDING SHEET (Page 15 of 16)

SUMMARY OF BID SCHEDULE

TOTAL BASE BID……………………………………….………………$
Cannon Green Neighborhood
Los Carneros (Cathedral Oaks Road to Calle Real)
Storke Road (Hollister Avenue to Bollay Drive)

TOTAL ALTERNATE “A
”……………….……………………...………$
Covington Neighborhood

TOTAL ALTERNATE “B
”……………….……………………...………$
Padova Drive (Salisbury Avenue to San Rossano Drive)

TOTAL ALTERNATE “C
”……………….……………………...………$
Padova Drive (Alpine Drive to Alameda Avenue)

TOTAL ALTERNATE “D
”……………….……………………...………$
Armstrong Road (Reed Court to Mills Way)

TOTAL ALTERNATE “E
”……………….……………………...………$
Hollister Avenue (Cathedral Oaks Road to Gate at West End)

TOTAL ALTERNATE “F
”……………….……………………...………$
Newport Drive and Palos Verdes Drive

TOTAL ALTERNATE “G
”……………….……………………...………$
Phelps Road (Pacific Oaks Road to Storke Road)

TOTAL ALTERNATE “H
”……………….……………………...………$
Phelps Road (Storke Road to East End)

TOTAL ALTERNATE “I
”……………….……………………...………$ _____
Cathedral Oaks Road (Evergreen Drive to Alameda Avenue)

TOTAL ALTERNATE “J
”……………….……………………...………$
Tree Root Repairs

TOTAL ALTERNATE “K
”……………….……………………...………$
Storke Road (Hollister Avenue to US 101)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 87 2022–2023 PAVEMENT REHABILITATION PROJECT

C-19
BIDDING SHEET (Page 16 of 16)

TOTAL BASE BID……………………………………….……$

______________________________________________________________ (Total Base Bid in Words)

_______________________________________________
Company Name of Bidder

NOTE: The City of Goleta will determine the lowest bid based on the total Base Bid.

Bidder shall bid on the Base Bid and all Bid Alternates. Bids that do not include all Bid Alternates will not be accepted. The City of Goleta reserves the right to add none or any combination of the Bid Alternates.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 88 2022–2023 PAVEMENT REHABILITATION PROJECT

C-20

This Page Intentionally Left Blank

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 89 2022–2023 PAVEMENT REHABILITATION PROJECT

C-21

PROPOSED EQUIPMENT AND MATERIAL MANUFACTURERS

The Bidder must indicate the name of the manufacturer of the equipment, and supplier of the material, proposed to be furnished under the contract. Awarding of a contract based on this bid does not imply approval by the City of the manufacturers or suppliers listed by the Bidder . No substitution will be permitted after award of contract except upon written approval of the City.

Equipment/Materials S
upplier

1. P ortland Cement Concrete Mixes

2. Quicklime/Cement Mixes

3. Asphalt Concrete Mixes

4. Aggregate Base

5. Detectible Warning Surfaces ________________________________

6. Traffic Stripe and Marking Paint ________________________________

7. ________________________________

8. Additional items in the Special Provisions

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 90 2022–2023 PAVEMENT REHABILITATION PROJECT

C-22

DESIGNATION OF SUBCONTRACTORS
Bidder proposes to subcontract certain portions of the Work which are in excess of one- half of one percent (0.5%) of the total amount base bid or $10,000, whichever is greater, and to procure materials and equipment from suppliers and vendors.

These Subcontractors are identified as follows:

Work to be
Performed
Subcontractor
License
Number
Subcontractor
DIR
Registration
Number
(Note1)
Percent of
Total Bid
Subcontractor’s
Name & Address

Note 1: Bidders have 24 hours after the Bid Deadline to submit this information

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 91 2022–2023 PAVEMENT REHABILITATION PROJECT

C-23
BIDDER’S REFERENCES
The following are the names, addresses, and phone numbers for three public agencies for which Bidder has performed projects of the same magnitude and character of the work bid within the past three years:

1. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount

2. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount

3. Name of Agency
Agency Address
Telephone
Contact Person
Contract Amount
The following are the names, addresses, and phone numbers for all brokers and sureties from whom Bidder intends to procure insurance bonds:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any local, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 92 2022–2023 PAVEMENT REHABILITATION PROJECT

C-24

ELIGIBILITY TO CONTRACT
The successful Bidder is prohibited from performing work on this Project with a Subcontractor who is ineligible to perform work on the Project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

BIDDER’S INFORMATION
Bidder certifies that the following information is true and correct:

Bidder’s Name ______________________________________________________________ Business Address ___________________________________________________________ __________________________________________________________________________ Telephone _________________________________________________________________ State Contractor’s License No. and Class _________________________________________ Original Date Issued E xpiration Date _____________________________ DIR Registration No:

The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this Bid:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this Bid are as follows:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ All current and prior DBA’s, alias, and/or fictitious business names for any principal having an interest in this Bid are as follows:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 93 2022–2023 PAVEMENT REHABILITATION PROJECT

C-25
I declare under penalty of perjury under the laws of the State of California that the above representations are true and correct . Executed this _____ day of ____________, 20_ _, at ___________________ California.

Signature and Title of Bidder
or Authorized Representative
(SEAL)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 94 2022–2023 PAVEMENT REHABILITATION PROJECT

C-26
BIDDER’S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS AND DEFAULTS

Identify all instances of being disqualified, removed, determined to be a non-responsible bidder, debarred, assessed liquidated damages, terminated for default or otherwise prevented from bidding on, or completing, a federal, state, or local government project.

1. Have you ever been disqualified from any government contract?

Yes  No 

2. If yes, explain the circumstances including date of public entity action, name of project, contract award amount and current contact person at public entity:

____________________________________________________________ Signature and Title of Bidder or Authorized Representative

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 95 2022–2023 PAVEMENT REHABILITATION PROJECT

C-27

BID BOND
FOR
2022–2023 PAVEMENT REHABILITATION PROJECT

KNOW ALL PERSONS BY THESE PRESENTS that [Bidder] ________________________ __________________________ as PRINCIPAL, and _______________________________, a corporation organized under the laws of the State of _________________________ and licensed by the State of California to execute bonds and undertakings as sole surety, as SURETY, are held and firmly bound unto the City of Goleta, as City, in the penal sum of ten percent (10%) of the total Bid Price , including alternates, on the Contract Work submitted by PRINCIPAL to CITY for the above stated project, for the payment of which sum, PRINCIPAL and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas PRINCIPAL has submitted a proposal to CITY for the above stated project.

NOW, THEREFORE, the penal sum guaranteed by this bond shall be forfeited to the City in the event of any of the following: (1) The aforesaid Principal withdraws said bid after the Bid Deadline contrary to applicable law; or (2) Principal fails, within ten (10) business days after receipt of written notice that the contract has been awarded to Principal and tender of the Contract, to, deliver to City the executed Agreement, in the prescribed form, in accordance with the bid as accepted, and file with the City all documents required in section 3 -1.18 of the City’s General Provisions.

In case suit is brought upon this bond, SURETY further agrees to pay all reasonable att orneys’ fees and costs incurred by CITY in an amount fixed by the court. SURETY hereby waives the provisions of California Civil Code Sections 2845 and 2849.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this ___
____day of , 20__.

PRINCIPAL:

(Address)

BY:

(Signature and Title of Authorized Officer)

BY:
(Signature and Title of Authorized Officer)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 96 2022–2023 PAVEMENT REHABILITATION PROJECT

C-28
SURETY:
(Address)

BY:
(Signature and Title of Authorized Officer)

BY:
(Signature and Title of Authorized Officer)
Note: All signatures must be acknowledged before a notary public. Attach appropriate acknowledgment. Also, evidence of the authority of any person signing as attorney-in-fact must be attached.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 97 2022–2023 PAVEMENT REHABILITATION PROJECT

C-29

STATEMENT ACKNOWLEDGING PENAL AND CIVIL PENALTIES
CONCERNING THE CONTRACTOR’S LICENSING LAWS
[Business & Professions Code § 7028.15; Public Contract Code § 20103.5]

The undersigned, a duly authorized representative of the Bidder, certify that I am aware of the provisions of California law and that I, or the company/individual on whose behalf this Bid is being submitted, hold a currently valid California contractor’s license as set forth in the Business and Professions Code § 7028.15 and Public Contract Code § 20103.5 (and any updates).

A contractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

Bidder:

License No.: Class Expiration date:

DIR Registration No.: _____________________

Date Signature

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 98 2022–2023 PAVEMENT REHABILITATION PROJECT

C-30

DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code §§ 1777.1 and 1777.7; Public Contract Code § 6109] The undersigned, a duly authorized representative of the Bidder, certifies and declares that:

1. The Bidder is aware of Sections 1771.1 and 1777.7 of the California Labor Code, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The Bidder is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The Bidder is aware of California Public Contract Code Section 6109 (and any updates.)

4. The Bidder has investigated the eligibility of each and every subcontractor the contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a p ublic works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 and 1777.7 of the Labor Code, or any other provision of law.

5. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

I declare under penalty of perjury under the laws of the State of California that the foregoing is t
rue and correct . Executed this day of , 20__ , at ________________________, California.

Signature:

Name:

Title:

Name of Company:

Note: Signature must be acknowledged before a notary public . Attach appropriate acknowledgment.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 99 2022–2023 PAVEMENT REHABILITATION PROJECT

C-31

NON-COLLUSION DECLARATION
FOR
2022–2023 PAVEMENT REHABILITATION PROJECT

I am the [title] of [name of
bidder], the party making the foregoing bid, declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly, colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, par
tnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state]

(Signature and Title of Authorized Representative)
.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 100
2022–2023 PAVEMENT REHABILITATION PROJECT

C-32

This Page Intentionally Left Blank

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 101
2022–2023 PAVEMENT REHABILITATION PROJECT

D-1

SECTION D

CONTRACT AWARD AND EXECUTION

CONTRACT

PERFORMANCE BOND FORM

PAYMENT BOND FORM

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 102
2022–2023 PAVEMENT REHABILITATION PROJECT

D-2

SAMPLE CONTRACT

This Public Works Contract (herein referred to as “CONTRACT”) is made and entered into by and between the CITY OF GOLETA, a municipal corporation (herein referred to as "CITY"), and CONTRACTOR (hereinafter referred to as “CONTRACTOR”).

SECTION 1. RECITALS

A. Pursuant to the Notice Inviting Sealed Bids for the 2020-2021 PAVEMENT REHABILITATION Project, bids were received, publicly opened, and declared on the date specified in the notice.

B. On __________ , Goleta’s City Council declared CONTRACTOR to be the lowest responsible bidder and accepted the bid of CONTRACTOR and t he City Council approved this CONTRACT and authorized the City Manager to execute the CONTRACT with CONTRACTOR for furnishing labor, equipment, and material for the 2022- 2023 Pavement Rehabilitation Project in the City of Goleta.

NOW, THEREFORE, in consideration of the foregoing and the mutual covenants herein contained, it is agreed:

SECTION 2. TERMS

1. G
ENERAL SCOPE OF WORK: CITY agrees to engage CONTRACTOR and CONTRACTOR agrees to furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the 2022-2023 Pavement Rehabilitation Project in the City of Goleta. The work shall be performed in accordance with the Plans and Specifications (and as generally described in the “Notice Inviting Sealed Bids,” attached as Exhibit A) and in accordance with bid prices set forth in CONTRACTOR’S Bid Proposal (attached as Exhibit B) and in accordance with the instructions of the City Engineer, or City’s Manager’s designee.

2. I
NCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY : The contract documents for the aforesaid project, a complete set of which is on file with the Goleta City Clerk’s Office, shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Standard Specifications, Special Provisions, and all referenced specifications, details, standard drawings, and appendices; together with this CONTRACT and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said contract documents are made a part hereof as though fully set forth herein. This contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written CONTRACT, the provisions of this CONTRACT, and the Standard Specifications, in that order, shall control. Collectively, these contract documents constitute the complete CONTRACT between CITY and CONTRACTOR and supersede any previous agreements or understandings.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 103
2022–2023 PAVEMENT REHABILITATION PROJECT

D-3

3. CO MPENSATION: CONTRACTOR agrees to receive and accept the prices set forth in its Bid Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid contract documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

4. T
IME OF PERFORMANCE : CONTRACTOR agrees to complete the work within the timeframe specified in the Contract Documents from the date of the notice to proceed. By signing this CONTRACT, CONTRACTOR represents to CITY that the contract time is reasonable for completion of the work and that CONTRACTOR will complete such work within the contract time. In accordance with Government Code Section 53069.85, CONTRACTOR agrees to forfeit and pay CITY as liquidated damages, not as a penalty, the sum of $1000 per day for each and every day of unauthorized delay beyond the completion date, which amount shall be deducted from any payments due or to becom e due the CONTRACTOR.

5. P
REVAILING WAGES :

A. Pursuant to Labor Code Sections §§1720 et seq., including but not limited to sections 1771, 1774 and 1775, and as specified in Title 8, California Code of Regulations, Section 16000 et seq., CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws.

B. In accordance with Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD. CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.

C. C
ITY directs CONTRACTOR’s attention to Labor Code Sections 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.

D. Labor Code Section 1777.5 requires CONTRACTOR or subcontractor empl oying tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 104
2022–2023 PAVEMENT REHABILITATION PROJECT

D-4

(1) When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or

(2) When the number of apprentices in training in the area exceeds a ratio of one to five, or

(3) When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or

(4) When assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

Pursuant to Labor Code § 1776, CONTRACTOR shall comply with all Department of Industrial Relations registration requirements.

E. CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions.

F. CONTRACTOR and any subcontractor must comply with Labor Code Sections 1777.5 and 1777.6 in the employment of apprentices.

G. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations (DIR), ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

H. CONTRACTOR and its subcontractors must keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this CONTRACT. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by CITY, CONTRACTOR must provide copies of the records at its cost.

6. L
EGAL HOURS OF WORK: CONTRA CTOR agrees to comply with the provisions of California Labor Code Section 1813 concerning penalties for workers who work excess hours. Except as provided by Labor Code Section 1815, the CONTRACTOR shall, as a penalty to the CITY, forfeit twenty five dollars ($25) for each worker employed in the execution of the Contract by the CONTRACTOR or by any Subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 (commencing at Section 1810) of the California Labor Code.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 105
2022–2023 PAVEMENT REHABILITATION PROJECT

D-5

7. TRAVEL AND SUBSISTENCE PAY : CONTRACTOR agrees to pay travel and subsistence pay to each worker needed to execute the work required by this CONTRACT as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8.

8. CO NTRACTOR'S LIABILITY : The CITY and its officers, agents and employees (“Indemnitees”) shall not be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workers or employees of CONTRACTOR, of its subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever.

CO
NTRACTOR will indemnify Indemnities against and will hold and save In demnitees harmless from any and all actions, claims, damages to persons or property, penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the work, operation, or activities of CONTRACTOR, its agents, employees, subcontractors or invitees provided for herein, whether or not there is concurrent passive negligence on the part of CITY. In connection therewith:
a. CONTRACTOR will defend any action or actions filed in connection with any such claims, damages, penalties, obligations or liabilities and will pay all costs and expenses, including attorneys' fees, expert fees and costs incurred in connection therewith.

b. CONTRACTOR will promptly pay any judgment rendered against CONTRACTOR or Indemnitees covering such claims, damages, penalties, obligations and liabilities arising out of or in connection with such work, operations or activities of CONTRACTOR hereunder, and CONTRACTOR agrees to save and hold the Indemnitees harmless therefrom.

c. In the event Indemnitees are made a party to any action or proceeding filed or prosecuted against CONTRACTOR for damages or other claims arising out of or in connection with the work, operation or activities hereunder, CONTRACTOR agrees to pay to Indemnitees and any all costs and expenses incurred by Indemnitees in such action or proceeding together with reasonable attorneys' fees.

CONTRACTOR'S obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by a n Indemnitee. However, without affecting the rights of CITY under any provision of this CONTRACT, Contractor shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 106
2022–2023 PAVEMENT REHABILITATION PROJECT

D-6

CITY active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.

So much of the money due to CONTRACTOR under and by virtue of the contract as shall be considered necessary by CITY may be retained by CITY until disposition has been made of such actions or claims for damages as aforesaid.

It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California. This indemnity provision shall survive the termination of the CONTRACT and is in addition to any other rights or remedies which Indemnitees may have under the law.

This indemnity is effective without reference to the existence or applicability of any insurance coverage which may have been required under this CONTRACT or any additional insured endorsements which may extend to Indemnitees.

CONTRACTOR, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the CONTRACTOR regardless of any prior, concurrent, or subsequent passive negligence by the Indemnitees.

9. T
HIRD PARTY CLAIMS: In accordance with Public Contracts Code Section 9201, CITY will promptly inform CONTRACTOR regarding third-party claims against CONTRACTOR, but in no event later than ten (10) business days after CITY receives such claims . Such notification will be in writing and forwarded in accordance with the “Notice” section of this CONTRACT. As more specifically detailed in the contract documents, CONTRACTOR agrees to indemnify and defend the City against any third-party claim.

10. W
ORKERS COMPENSATION: In accordance with California Labor Code Sections 1860 and 3700, CONTRACTOR and each of its subcontractors will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, CONTRACTOR, by signing this contract, certifies as follows: “I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

11. I
NSURANCE : With respect to p erformance of work under this CONTRACT, CONTRACTOR shall maintain and shall require all of its subcontractors to maintain insurance as required in the Standard Specifications.

12. AS SIGNMENT : This CONTRACT is not assignable nor the performance of either party's duties delegable without the prior written consent of the other party. Any attempted or purported assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 107
2022–2023 PAVEMENT REHABILITATION PROJECT

D-7

13. INDEPENDENT CONTRACTOR: CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent contractor. Neither the CITY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR'S employees, except as herein set forth. CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of CITY.

14. T
AXES : CONTRACTOR is responsible for paying all retail sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this contract. CONTRACTOR is responsible for ascertaining and arranging to pay them. The prices established in the contract shall include compensation for any taxes CONTRACTOR is required to pay by laws and regulations in effect at the bid opening date.

15. L
ICENSES: CONTRACTOR represents and warrants to CITY that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of CONTRACTOR to practice its profession. CONTRACTOR represents and warrants to CITY that CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this CONTRACT any licenses, permits, insurance, and approvals which are legally required of CONTRACTOR to practice its profession.

CONTRACTOR shall maintain a City of Goleta business license, if required under CITY ordinance.

16. RE
CORDS : CONTRACTOR shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to this CONTRACT and such other records as may be deemed necessary by CITY or any authorized representative, and will be retained for three years after the expiration of this CONTRACT. All such records shall be made available for inspection or audit by CITY at any time during regular business hours.

17. SEVER
ABILITY: If any portion of these contract documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this CONTRACT will continue in full force and effect provided that it does not frustrate the mutual intent of the parties herein.

18. W
HOLE AGREEMENT : This CONTRACT supersedes any and all other agreements either oral or written, between the parties and contains all of the covenants and agreements between the parties pertaining to the work of improvements described herein.

Each party to this contract acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statements or promise not contained in this contract shall not be valid or binding. Any modifications of this contract will be effective only if signed by the party to be charged.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 108
2022–2023 PAVEMENT REHABILITATION PROJECT

D-8

19. AUTHORITY: CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this CONTRACT represent all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest herein. Each party warrants that the individuals who have signed this CONTRACT have the legal power, right, and authority to make this CONTRACT and to bind each respective party .

This CONTRACT may be modified by written amendment . CITY’s City Manager may execute any such amendment on CITY’s behalf.

20. NO TICES: All notices permitted or required under this CONTRACT shall be in writing and shall be deemed made when delivered to the applicable party’s representative as provided in this CONTRACT. Additionally, such notices may be given to the respective parties at the following addresses, or at such other addresses as the parties may provide in writing for this purpose. Such notices shall be deemed made when personally delivered or when mailed forty -eight (48) hours after deposit in the U.S. mail, first -class postage prepaid, and addressed to the party at its applicable address. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

C

ITY OF GOLETA
130 Cremona Drive, Suite B
Goleta, CA 93117
Attn: City Manager

CONTRACTOR

__________________________________________________
__________________________________________________
__________________________________________________

21. D
ISPUTES: Disputes arising from this contract will be determined in accordance with the contract documents.

22. NO N- DISCRIMINATION: No discrimination shall be made in the employment of persons in the work contemplated by this CONTRACT because of race, religion, color, medical condition, sex, sexual orientation, national origin, political affiliation or opinion, or pregnancy or pregnancy- related condition. A violation of this section exposes CONTRACTOR to the penalties provided for in Labor Code Section 1735.

23. NO
THIRD PARTY BENEFICIARY: This CONTRACT and every provision herein is for the exclusive benefit of CONTRACTOR and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the CONTRACTOR’s or the CITY’s obligations under this Contract.

24. T
IME IS OF ESSENCE: Time is of the essence for each and every provision of the Contract Documents.

25. ACCE PTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES: The Parties agree that this CONTRACT, agreements ancillary to this CONTRACT, and related documents to be entered into in connection with this CONTRACT will be considered signed when DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 109
2022–2023 PAVEMENT REHABILITATION PROJECT

D-9

the signature of a party is delivered by facsimile transmission or scanned and delivered via electronic mail. Such facsimile or electronic mail copies will be treated in all respects as having the same effect as an original signature.

26. G
OVERNING LAW : This CONTRACT shall be governed by the laws of the State of California, and exclusive venue for any action involving this CONTRACT will be in Santa Barbara County.

I
N WITNESS WHEREOF , the parties hereto have executed this CONTRACT with all the formalities required by law on the respective dates set forth opposite their signatures.

This CONTRACT is executed on this ________ day of ___________ , at Goleta, California, and effective as of _____ ______, 20____.

CITY OF GOLETA:

___________________________________
Michelle Greene, City Manager

ATTEST:

___________________________________
Deborah Lopez, City Clerk

APPROVED AS TO FORM:

MEGAN GARIBALDI, CITY ATTORNEY

___________________________________
Winnie Cai, Assistant City Attorney
CONTRACTOR:

_____________________________________
Name, Title

_____________________________________
Name, Title

State of California License No.

_____________________________________
Department of Industrial Relations Registration No.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 110
2022–2023 PAVEMENT REHABILITATION PROJECT

D-10

_____________________________________

Business Phone No.

_____________________________________

CONTRACTOR’S Emergency Phone No. at which
contractor can be reached at any time

_____________________________________

_____________________________________

_____________________________________

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 111
2022–2023 PAVEMENT REHABILITATION PROJECT

D-11

FAITHFUL PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Goleta, (hereinafter referred to as “City”) has awarded to ____________________________, (hereinafter referred to as the “Contractor”) an agreement for the 2022 –2023 PAVEMENT REHABILITATION PROJECT , (hereinafter referred to as t he “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, ______________________, the undersigned Contractor and ________________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, including alternates, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, u nless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship.

The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 112
2022–2023 PAVEMENT REHABILITATION PROJECT

D-12

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:

1. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or

2. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

3. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 113
2022–2023 PAVEMENT REHABILITATION PROJECT

D-13

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-F act Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges is $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of ___________________________________________ process in California, if different ___________________________________________ from above)
(Telephone number of Surety ___________________________________________ and Agent or Representative for
service of process in California)

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 114
2022–2023 PAVEMENT REHABILITATION PROJECT

D-14

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PER JURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 115
2022–2023 PAVEMENT REHABILITATION PROJECT

D-15

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PER JURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.

END OF PERFORMANCE BOND
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 116
2022–2023 PAVEMENT REHABILITATION PROJECT

D-16

This Page Intentionally Left Blank
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 117
2022–2023 PAVEMENT REHABILITATION PROJECT

D-17

LABOR AND MATERIAL PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Goleta (hereinafter designated as the “City”), by action taken or a resolution passed ___________________ , 20____, has awarded to ________________________ hereinafter designated as the “Principal,” a contract for the work described as follows: the 2022–2023 PAVEMENT REHABILITATION PROJECT (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and sever ally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted r escission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 118
2022–2023 PAVEMENT REHABILITATION PROJECT

D-18

conditions of recovery shall be that claimant is a person described in Civil Code Section 9100 , and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, i ncluding but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fa ct Certificate) Title

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 119
2022–2023 PAVEMENT REHABILITATION PROJECT

D-19

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY u nder the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 120
2022–2023 PAVEMENT REHABILITATION PROJECT

D-20

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer

Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney -in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.

END OF PAYMENT BOND
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 121
2022–2023 PAVEMENT REHABILITATION PROJECT

E-1

SECTION E

CITY GENERAL PROVISIONS

Standard Specifications
The work provided herein shall be performed in accordance with the Standard Specifications for Public Works Construction, 2018 Edition, of the Southern California Chapter American Public Works Association. Part 1, General Provisions of the Standard Specifications is incorporated herein by reference. In case of conflict between the Standard Specifications and these General Provisions, the General Provisions shall take precedence.

Modifications to Standard Specifications
S
ection 1 – No changes.

Section 2 – Scope of the Work
Add the following:

Section 2-1 .1 Conflict in Plans
As the figured dimensions shown on the drawings and in the specifications of the contract may not in every case agree with scale dimensions, the figured dimensions shall be followed in preference to the scaled dimensions, and drawings to a large scale shall be followed in preference to the drawings to a small scale. Should it appear that the work to be done, or any of the matter relative thereto is not sufficiently detailed or explained in the contract documents, the Contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform thereto as part of the contract so far as may be consistent with the terms thereof.

Section 2-1.
2 Suggestions to Contractor
Any plan or method of work suggested by the Agency or the Engineer to the Contractor but not specified or required, if adopted or followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the Contractor; and the Agency and the Engineer shall assume no responsibility therefore and in no way be held liable for any defects in the work which may result from or be caused by use of such plan or method of work.

Section 2-5.
5 Water for Construction
Attention is directed to the various sections of the Standard Specifications and these Special Provisions which require the use of water for the construction of this project.

Water for construction purposes as required by these Specifications will be provided by the Goleta Water District at the Contractor's expense. The City encourages the Contractor to use reclaimed water when a fill station is located nearby.

Water required for controlling dust, caused by the Contractor's operations and the passage of traffic through the construction site shall be applied as necessary, at the Contractor's expense.

The Contractor shall, whenever possible and not in conflict with these specifications, minimize DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 122
2022–2023 PAVEMENT REHABILITATION PROJECT

E-2
the use of water during construction of the project. Watering equipment shall be kept in good working order and water leaks shall be repaired promptly.

Full compensation for providing water for the project shall be considered as included in the contract prices paid for the various items of work and no separate payment shall be Section 2-7.
1 General
The City will issue a Contract Change Order (CCO) if a change to the Total Contract Price or Contract Time is necessary. The Contractor will not be entitled to any adjustments in either Contract Time or Total Contract Price for changes performed without written direction from the City. Adjustments in Contract Time or Total Contract Price for changes performed will not be made until a Contract Change Order is approved.

Section 2-10 Disputed Work
If the Contractor and the Agency are unable to reach agreement on disputed work, the Agency may direct the Contractor to proceed with the work. Disputes which remain unresolved shall be subject to Section 9 and 10, Claim Resolution Process. Payment shall be later determined by mediation, if the Agency and Contractor agree thereto, or as fixed in a court of law. Although not to be construed as proceeding under extra work provisions, the Contractor shall keep and furnish records of disputed work in accordance with the Contract Documents.

Section 3
– Control of the Work
Add the following:

Section 3-7. 2 Precedence of the Contract Documents.

In the event of conflicts or discrepancies between the Contract Documents, the provision placing a more stringent requirement on the Contractor shall prevail. The Contractor shall provide the better quality or greater quantity of Work and/or materials, unless otherwise directed by Agency in writing. In the event none of the Contract Documents place a more stringent requirement or greater burden on the Contractor, the controlling provision shall be that which is found in the document with higher precedence.

The governing ranking of Contract parts in descending order is:

1. Permits and other governmental approvals;

2. Change Orders and Construction Change Directives, issued after execution of the Agreement

3. Agreement/Contract; including all attachments and Addenda with later Addenda having priority over earlier Addenda

4. City Special Provisions

5. City General Provisions

6. Project Plans

7. Standard Specifications for Public Works Construction, 2018 Edition (Greenbook)

8. City of Goleta standard Plans

9. County of Santa Barbara standard Plans

10. Caltrans Standard Special Provisions for 2015 Standard Specifications

11. Caltrans Revised Standard Specifications

12. Caltrans Standard Specifications

13. Caltrans Revised Standard Plans

14. Supplemental project information
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 123
2022–2023 PAVEMENT REHABILITATION PROJECT

E-3

15. Written numbers and notes on a drawing govern over graphics

16. A detail drawing governs over a general drawing

17. A detail specification governs over a general specification

18. A specification in a section governs over a specification referenced by that section

If a discrepancy is found or confusion arises, submit a Request for Information (RFI.) Section 3-13 .3.1 Guaranty
The Contractor shall warrant and guarantee the entire work and all parts thereof, including that performed and constructed by Subcontractors, Sub-subcontractors, and others employed directly or indirectly on the work, against faulty or defective materials, equipment or workmanship for the maximum period provided by law. In addition, thereto, for a period of one year commencing on the date of acceptance of the work, the Contractor shall, upon the receipt of notice in writing from the Agency, promptly make all repairs arising out of defective materials, workmanship or equipment and bear the cost thereof. The Agency is hereby authorized to make such repairs and the Contractor and Surety shall bear the cost thereof if, ten (10) days after the giving of such notice to the Contractor, the Contractor has failed to make or undertake with due diligence the repairs, provided, however, that, in the case of an emergency where, in the opinion of the Agency, delay could cause serious loss or damage, repairs may be made without notice being sent to the Contractor or Surety, and all expense in connection therewith shall be charged to the Contractor and Surety.

For the purpose of this article, "acceptance of the work" shall mean the acceptance of the work by the Agency in accordance with the Contract Documents but not for the purpose of extinguishing any covenant or agreement on the part of the Contractor to be performed or fulfilled under this contract which has not in fact been performed or fulfilled at the time of such acceptance all of which covenants and agreements shall continue to be binding on the Contractor until they have been fulfilled.

The effective date of acceptance of the work for purposes of determining commencement of the warranty period shall be the date of recordation of the Notice of Completion by the County Recorder.

Section 4
– Control of Materials
Add the following:

Section 4- 1.1. Retention of Defective Work
If, in the opinion of the Engineer, the defective work is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if, in the opinion of the Engineer, the removal of such work is impractical or will create conditions which are dangerous or undesirable, the Agency shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but will make such deductions therefore in the payments due or to become due to the Contractor as the Agency may deem just and reasonable.

Section 5 –
Legal Relations and Responsibilities
Add the following:

Section 5- 1.1 Mandatory Notification Prior to Excavation The Contractor's attention is directed to Section 4215.5 through 4217 of t he Government Code of the State of California. This requires that two (2) working days prior to commencing any DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 124
2022–2023 PAVEMENT REHABILITATION PROJECT

E-4
excavation "Underground Service Alert of Southern California" be notified by telephone, toll free 1-800-422-4133 or 811, for the assignment of an Inquiry Identification Number.

No excavation shall commence unless the Contractor has obtained the Inquiry Identification N
umber and so notified the Engineer.

As part of the performance required, the Contractor shall assist the Agency to and provide the Agency with, any and all compliance required of Agency as an operator under the provisions of California Government Code Sections 4216-4216.5.

Section 5- 1.2 Accuracy of Utilities Information`
The locations of existing major utilities, whether above ground or underground, are indicated on the drawings. The Agency does not guarantee the accuracy or completeness of this information and it is to be understood that other above-ground and underground facilities not shown on the drawings may be encountered during the course of the work. In any case, existing minor lines are not indicated.

Section 5-4.
2 General Liability Insurance
The general liability must be at least combined single limits of no less than $2,000,000 per occurrence for all covered losses and no less than $4,000,000 general aggregate, and must contain:

1. Extension of coverage to the City, its officials, officers, agents and employees, as additional insureds, with respect to Contractor's liabilities hereunder in insurance coverages identified above;

2. A provision that coverage will not be canceled or subject to reduction until at least thirty (30) days' prior written notice has been given to the City Clerk, addressed to 130 Cremona Drive, Suite B, Goleta, CA 93117;

3. A provision that Contractor's insurance shall apply as primary, and not excess of, or contributing with, the City;

4. Contractual liability coverage sufficiently broad so as to include the liability assumed by the Contractor in the indemnity and hold harmless provisions of the Standard Condition;

5. A cross liability clause, or equivalent wording, stating that coverage will apply separately to each named or additional insured as if separate policies had been issued to each;

6. A broad form property damage endorsement;

7. A provision that the policies be provided on an "occurrence" basis;

8. Coverage for XCU (explosion, collapse, underground) hazards if applicable to the work; and

9. Products and completed operations coverage.

Umbrella or Excess Liability policies (Over Primary) if used to meet limit requirements shall provide coverage at least as broad as specified for underlying coverages and covering those insured in the underlying policies. Any such policy shall include a drop-down provision providing primary coverage above a maximum $25,000 self -insured retention for liability not covered by primary but covered by the umbrella. Coverage shall be “pay on behalf,” with defense costs payable in addition to policy limits. There shall be no cross -liability exclusion of claims or suits by one insured against another. Coverage shall be applicable to City for injury to employees of Contractor, subcontractors or others involved in the Work. Limits are subject to review but in no event less than $1,000,000 per occurrence.

Approval of insurance by the City or acceptance of the certificate of insurance by City shall not relieve or decrease the extent to which the Contractor may be held responsible for payment of DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 125
2022–2023 PAVEMENT REHABILITATION PROJECT

E-5
damages resulting from Contractor's services or operation pursuant to the Agreement, nor shall it be deemed a waiver of City's rights to insurance coverage hereunder.

Replace entire section 5-4 .2-1 with:
5-4.2-1 Policy Forms, Endorsements and Certificates
Provide and maintain current certificates of Insurance on forms supplied by the City and evidencing the above coverage to City prior to execution of this Agreement by City. Exercise due diligence to require any and all subcontractors and/or sub- subcontractors and all tiers of such subcontractors to provide General and Automobile Liability, and Workers' Compensation and Employer's Liability Insurance with minimum limits of coverage and upon terms and provisions required above.

Section 6-
Prosecution and Progress of the Work
Add the following:

Section 6- 1.3 Notice to Proceed
After the execution of the contract, written notice to proceed will be given by the Agency to the Contractor. Notwithstanding any other provision of the contract, the Agency shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed whether or not the Agency has knowledge of the furnishing of such work.

Section
6-4 .1.1 Notice of Delays
Whenever the Contractor foresees any delay in the prosecution of the work, and in any event immediately upon the occurrence of any delay which the Contractor regards as unavoidable, the Contractor shall notify the Engineer in writing of the probability of the occurrence of such delay and its cause in order that the Engineer may take immediate steps to prevent, if possible, the occurrence or continuance of the delay, or, if this cannot be done, may determine whether the delay is to be considered avoidable or unavoidable, how long it continues, and to what extent the prosecution and completion of the work are to be delayed thereby. It will be assumed that any and all delays which have occurred in the prosecution and completion of the work have been avoidable delays, except such delays as shall have been called to the attention of the Engineer at the time of their occurrence and found by the Engineer to have been unavoidable.

The Contractor shall make no claims that any delay not called to the attention of the Engineer at the time of its occurrence has been an unavoidable delay.

Section
6-4 .1.2 Avoidable Delays
Avoidable delays in the prosecution or completion of the work shall include all delays which in the opinion of the Engineer would have been avoided by the exercise of care, prudence, foresight and diligence on the part of the contractor or the subcontractors. The following shall be considered avoidable delays within the meaning of the contract: 1) Delay in the prosecution of parts of the work which may in themselves be unavoidable but do not necessarily prevent or delay the prosecution of other parts of the work nor the completion of the whole work within the time herein specified; 2) Reasonable loss of time resulting from the necessity of submitted samples of materials and drawings to the Engineer for approval and from making of tests of materials, measure ments and inspections; 3) Reasonable interference of other contractors DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 126
2022–2023 PAVEMENT REHABILITATION PROJECT

E-6
employed by the Agency which do not necessarily prevent the completion of the whole work within the time agreed upon.

Section 6-4 .1.3 Extension of Time
In case the work is not completed in the time specified, including such extensions of time as may have been granted for unavoidable delays, the Contractor will be assessed damages for delay in accordance with the Contract Documents. The Agency, however, shall have the right to grant an extension of time for avoidable delay if it is deemed in the Agency 's best interest to do so.

During such extension of time, the Contractor will be charged for engineering and inspection services and other costs as provided in the Contract Documents.

Section
6- 2.1 Working Hours
Regular working hours shall be within the hours of 7:30 a.m. and 4:30 p.m., unless otherwise authorized by the Engineer or as otherwise identified in these Contract Documents. Overtime and shift work may be established as a regular procedure by the Contractor only with the written permission of the Engineer. Such permission may be revoked at any time. No work shall be permitted on Saturdays, Sundays or legal holidays, except such work as is necessary for the proper care and protection of the work already performed or in case of an emergency.

It is unlawful to construct, demolish, excavate, alter or repair any building or structure between the hours of 8:00 p.m. and 6:00 a.m. without the written approval of the Engineer. The following required information shall be provided to the Engineer in writing a minimum of fourteen (14) calendar days in advance of the commencement of the proposed work:

1. Specific date, hours and location of work

2. Complete description of work to be done

3. Number and type of equipment to be used

4. Noise mitigation measures to be employed

5. Distance of the nearest resident to the work

6. Inspection required

All work in the following commercial zones is prohibited between November 15 and January 2:

Hollister Avenue between Pacific Oaks Road and Cortona Drive; Storke Road between the 101 Freeway and Marketplace Drive; Hollister Avenue between Fairview Avenue and Patterson Avenue; Fairview Avenue between Shirrell Way and Carson Street; and Calle Real between Vega Street and Kellogg Avenue.

All work on streets within a School Zone as defined by the California Vehicle Code 40802 shall be limited to days when school is not in session or while students are not traveling to and from school, unless otherwise authorized by the Engineer in writing.

To the extent practicable, all work shall be scheduled to minimize inconvenience to the public, such as coordinating the timing of work in a specific area, or to avoid potential conf licts with adjacent private development to the degree possible.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 127
2022–2023 PAVEMENT REHABILITATION PROJECT

E-7
Section 6-8.1 Completion and Acceptance
A job walk will be performed at such time as the Contractor indicates that all items have been completed. A list of the remaining minor tasks (a punch list) will be prepared by the Engineer and given to the Contractor.

All punch list items shall be completed during the contract period, and the Agency will assess liquidated damages for each day that the punch list items are not completed beyond the contract period. When all items have been completed to the satisfaction of the City Engineer, the project will be submitted to the City Council recommending accept once the completed work.

The Engineer will, in reporting completion to the City Council, give the date when the work was completed. This will be the date when the Contractor is relieved from responsibility to protect and maintain the work, except for portions of the work for which the Contractor may have previously been relieved of such responsibility in accordance with the Contract Documents.

Section
6-9.1 Liquidated Damages for Avoidable Delay
For each and every day that any portion of the work remains unfinished after the time fixed for completion in the contract documents as modified by any extension of time granted pursuant to Section 6-4.6.3, damage will be sustained by the Agency. Because of the difficulty in computing the actual material loss and disadvantage to the Agency , it is determined in advance and agreed to by the parties hereto that the Contractor will pay the Agency the amount of damages set forth herein as representing a reasonable forecast of the actual damages which the Agency will suffer by the failure of the Contractor to complete the work within the stipulated time. The execution of the agreement shall constitute acknowledgment by the Contractor that he or she has ascertained and agrees that the Agency will actually suffer damages in the amount herein fixed for each and every day during which the completion of the work is avoidably delayed beyond the stipulated completion date.

Unless otherwise provided in the contract documents, the Contractor shall have no claim or right of action against the Agency for damages, costs, expenses, loss of profits, or otherwise because or by reason of any delay in the fulfillment of the contract within the time limited therefore occasioned by any cause or event within or without the Contractor's control, and whether or not such delay may have resulted from anything done or not done by the Agency of the contract.

Damages for avoidable delays shall be in the amount of $1,000.00 for each consecutive calendar day in excess of the time specified for completion of the work.

Section 7 – M
easurement and Payment
Add the following:

Section 7-3. 2.1 Request for Payment
Progress payments will be made monthly after, receipt of a properly completed request from the Contractor with qualities confirmed and approval by the City. The Contractor shall submit all such requests for monthly progress payments, and shall include the following forms as applicable:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 128
2022–2023 PAVEMENT REHABILITATION PROJECT

E-8
Form CC1: Progress Payment Request
This form is to be completed and signed by the Contractor and attached as a cover sheet to the request for payment. This form will be mandatory on all contract payment requests.

Form CC2: P rogress Payment Request - Detail
This form shall be used by the Contractor to provide the detail required to verify the payment quantities.

Form CC3: Quantity Change Verification Form
This form is required before any payment can be made based on actual quantities exceeding bid quantities. At the conclusion of the contract, the City will issue a "Balancing Change Order" incorporating all quantity increases and decreases in the contract items of work.

Form CC4: Final Release Form
This form shall be signed by the Contractor and submitted with the final payment request. The contractor shall also sign and submit the Acknowledgement of Final Closeout and Release of Claims with the final Payment Request, or other documents to the satisfaction of the engineer.

The City will withhold five (5) percent of all monthly progress payments as retention to assure completion and payment of labor and materials.

Retention will be released to the Contractor Thirty Five (35) days after acceptance of the work by the City Council and the filling of a Notice of Completion.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 129
2022–2023 PAVEMENT REHABILITATION PROJECT

E-9

CITY OF GOLETA, CA
Public Works Department
Construction Contract
Form CC1 - Progress Payment Request
From: Date: _______________________
Contractor Contract No.: _________________
Payment Request No.: __________
Address
To: CITY OF GOLETA
Public Works Department
130 Cremona Drive, Suite B
Goleta, California 93117
Project Name:

Original Contract Amount: $
Approved Change Orders through #:_______ $
Quantity Changes:
(Requires Project Engineer verification)
$
Total Contract Amount to Date: $

Value of Work Completed to Date: $
Less Retention: $
Less Liquidated Damages: $
Subtotal: $
Less Previous Payments Approved: $
Progress Payment Requested: $

The undersigned Contractor or Contractor's Authorized Representative certifies that to the best of his or her knowledge, information and belief, the work covered in this application for payment has been completed in accordance with the contract documents and the costs shown are true and correct.

Signature Print Name
Title Date
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 130
2022–2023 PAVEMENT REHABILITATION PROJECT

E-10

CITY OF GOLETA, CA
Public Works Department
Construction Contract
Form CC2- Progress Payment Request - Detail
Date: Payment Request No: Contract No.:

Contractor:

Project Name:

ITEM
NO.

DESCRIPTION UNIT BID

QUANTITY
UNIT/
FIRM
PRICE

INPLACE

THIS PERIOD

INPLACE
TOTAL
QTY. OR % EXTN. QTY. OR % EXTN.
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 Contractor Signature Date Inspector Signature Date DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 131
2022–2023 PAVEMENT REHABILITATION PROJECT

E-11

CITY OF GOLETA, CA
Public Works Department
Form CC3- Quantity Change Verification Form

Date: Contract No.:

Contractor: Project Name:

INSTRUCTIONS
This form is to accompany progress payments where there is quantity changes (variations in quantities authorized as part of the progress or final payment.

The quantity changes in amount of $________________________ accompanying Progress Payment #__________________ have been reviewed and actual quantities verified.

Project Engineer Signature Date

Bid
Item #

Item Description

Variance

Total

ATTACH ADDITIONAL SHEETS IF NECESSARY

Contractor Signature Inspector Signature

Date Date
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 132
2022–2023 PAVEMENT REHABILITATION PROJECT

E-12

CITY OF GOLETA, CA
Public Works Department
Construction Contract
Form CC4- Final Release Payment

From: _____________________________ Date: __________________________ Contractor
Contract No. _____________________

_____________________________ Payment Request No. _______________ Address

_____________________________
Project Name:

To: CITY OF GOLETA, CA
Public Works Department
130 Cremona Drive, Suite B
Goleta, California 93117

Upon settlement of final quantities and approval of a Notice of Completion for the project by the Goleta City Council, including any approved changes, this document shall be effective to release any and all further rights of the Contractor to security for payment, including any worker's, mechanic's or material supplier's lien, stop notice claim or right to bond that the undersigned may have for the work furnished for the project . This document is offered as evidence for settlement of final payment and to induce the City Council to approve such final payment for Contractor in connection with the PROJECT NAME.

This release covers the final payment to the undersigned for all labor, services, equipment and material furnished on the job, including the work of all subcontractors and all materials furnished for all suppliers, and other agents acting on behalf of the undersigned on this work . There are no disputed claims for additional work.

______________________________ _________________________ Contractor Signature: Print Name:
______________________________ _________________________ Title: Date:

NOTICE: A signed final release is required with submittal of request for payment.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 133
2022–2023 PAVEMENT REHABILITATION PROJECT

E-13
Post-Construction Waste Reduction & Recycling Summary Report Diversion Requirement: Reduce quantity of materials disposed at landfills by 65% or more.

Column A: List estimated quantities of waste for each material type (in tons). To convert material quantities to tons, use the Materials Conversion Worksheet provided in your packet.

Columns B, C, D: List estimated quantities reused, recycled, or disposed.

Column E: State the name of all vendors or facilities to be used to reuse, recycle or dispose of material listed. See example below for cases where more than one facility will be used for a particular material type.

Column Totals: Add up all quantities listed in Column A. Do the same for Columns B, C and D.

Waste Reduction & Recycling Summary REPORT (WRRS Report) Material Handling Methods - Indicate quantities (in tons only) for each material listed.

Material Type
A
Total Tons
Generated
(A=B+C+D)
B
Quantity
Salvaged or
Reused
C
Recycling
D
Estimated
Disposal
E
Anticipated Material
Destination(s)
(R): Recycled; (D): Disposal
Example:

Cardboard 2 tons 1.5 .5 (R) MarBorg
(D) Tajiguas Landfill
Asphalt & Concrete
Brick/Masonry/Tile
Building Materials (doors, windows,
fixtures, etc.)
Carpet
Carpet padding/Foam
Cardboard
Ceiling tile (acoustic)
Dirt
Drywall (used)
Drywall (new, unpainted sheets or scrap)
Landscape Debris (brush, trees, stumps,
etc.)
Scrap metal
Unpainted Wood and Pallets
Garbage/Trash
Other
Recycled mixed debris
Column Totals

7. To determine if the required 65% project waste reduction will be met, complete the following with the column totals: B + C ) / A = x 100 = %

8. Is the percentage listed in #7 greater than or equal to 65%? YES NO - If “NO” please explain why:

9. Print Name: Signature: Date: __ _ _/__ __/___ _

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 134
2022–2023 PAVEMENT REHABILITATION PROJECT

E-14

ACKNOWLEDGEMENT OF FINAL CLOSEOUT AND RELEASE OF CLAIMS

THIS ACKNOWLEDEMENT OF FINAL CLOSEOUT AND RELEASE OF CLAIMS (Acknowledgement) is made in Goleta, California, this _______ day of __________, _______, by and between the City of Goleta, (Owner), and ___________________________________ (Contractor).

KNOW ALL PERSONS BY THESE PRESENTS:

1. That the undersigned, as the authorized representative of Contractor, and for each of its successors, assigns and partners, for and in consideration of __________________________________________ ($___________), for the origi nal Contract amount, and the sum of ________________________________________ ($___________) for Contract Change Orders Nos.(1) through ______ (__), receipt of which is acknowledged, does release and forever discharge Owner, and each of its successors, assigns, council members, officers, agents, servants, volunteers and employees, from any and all rights, claims, causes of action, demands, debts, obligations, liabilities, actions, damages, costs and expenses (including but not limited to attorneys’, paralegal and experts’ fees, costs and expenses) and other claims, which may be asserted against Owner by reason of any matter or thing which was the subject matter of or basis for:

A. The performance of all terms and conditions of the Public Works Contract agreement dated ____________, for Owner project described as 2022–2023 PAVEMENT REHABILITATION PROJECT.

B. Change Orders Nos. one (1) through __________ (___), as approved by the parties, pertaining to Purchase Order No. _____

2. Nothing contained in this Acknowledgement shall waive or alter the rights, privileges, and powers of Owner or the duties, liabilities and obligations of Contractor and its surety(ies) in respect to any portion of the Contract.

3. Owner has received the following claims from Contractor _________________ ______________________________________________________________. cept as expressly provided in this section, Owner has received no other claims from Contractor.

4. Upon execution of this Acknowledgement, Owner agrees to promptly initiate the process for City Council to approve the Notice of Completion (NOC) and record the NOC with the Santa Barbara County Recorder.

5. Contractor and Owner agree that the total adjusted Contract Price and time of performance after the execution of change orders, is as follows:

Original Contract Price $______________________ Original Calendar Days ___________________ days

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 135
2022–2023 PAVEMENT REHABILITATION PROJECT

E-15
Adjusted Contract Price with Change Orders $______________________ Adjusted Calendar Days ___________________ days Final Contract Price Per Actual Work Completed $______________________ Final Retention Amount $______________________

6. The retention will be released to Contractor within thirty-five (35) days after acceptance of the work by the City Council and the filing of a Notice of Completion.

7. It is understood and agreed by Contractor that the facts with respect to which the release provided pursuant to this Acknowledgement is given may turn out to be other than or different from the facts as now known or believed to be, and Cont ractor expressly assumes the risk of the facts turning out to be different than they now appear, and agrees that the release provided pursuant to this Acknowledgement shall be, in all respects, effective and not subject to termination or rescission by any such difference in facts and Contractor expressly waives any and all rights it has or may have under California Civil Code Section 1542, which provides as follows:
"A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the Release which if known by him must have materially affected his settlement with the debtor."

8. The release made by Contractor is not to be construed as an admission or admissions of liability and Contractor denies any such liability. Contractor agrees that it will forever refrain and forebear from commencing, instituting or prosecuting any lawsuit, action or other proceeding against Owner based on, arising out of, or in any way connected with the subject matter of this release.

9. Except as specifically provided in this Acknowledgement, the Contractor releases Owner from all claims, including but not limited to those of its Subcontractors for all delay and impact costs, if any.

10. The Contractor represents and warrants to Owner that Contractor has not assigned or transferred or purported to assign or transfer to any person, firm, corporation, association or entity any of the rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims and Contractor agrees to indemnify and hold harmless Owner, its successors, assigns, council members, officers, agents, servants, volunteers and employees, from and against, without limitation, any and all rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims, including but not limited to attorneys’, paralegal and experts’ fees, costs and expenses arising out of or connected with any such assignment or transfer or purported assignment or transfer.

11. The parties acknowledge that they have been represented by counsel of their own choice in connection with the preparation and execution of this Acknowledgement. The parties acknowledge and represent that they understand and voluntarily consent and agree to each and every provision contained in this Acknowledgement.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 136
2022–2023 PAVEMENT REHABILITATION PROJECT

E-16

12. The persons executing this Acknowledgement represent and warrant to the other party that the execution and performance of the terms of this Acknowledgement have been duly authorized by all individual, corporate, partnership, or other entity requirements and that such persons have the right, power, legal capacity and authority to execute and enter into this Acknowledgement.

13. The parties further acknowledge and represent that no promise, inducement or agreement, not expressed in this Acknowledgement, have been made and that, with respect to the matters considered, this Acknowledgement contains the entire agreement among the parties and that the terms of the Acknowledgement are contractual and not a mere recital.

CITY OF GOLETA CONTRACTOR

__________________________ _________________________
By/Title Date By/Title Date

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 137
2022–2023 PAVEMENT REHABILITATION PROJECT

E-17
Replace Section 7-3.5.2 Increases of More Than 25 Percent

Should the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 25 percent, payment for the quantity in excess of 125 percent of the Bid quantity will be made on the basis of a decrease in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or in the event mutual agreement cannot be reached, on the basis of Extra Work per 7- 4 or at the Contract Unit Price at the Agency’s option. The Extra Work per 7-4, basis of payment, shall not include fixed costs. Fixed costs will be deemed to have been recovered by the Contractor through payment for 125% of the Bid quantity at the Contract Unit Price.

Section 7-3.

5.3 Decrease of More Than 25 Percent.

The Agency, at its sole discretion, may decrease the quantities of the items of work to be completed under this contract. In such an event, payment will be made based upon the decrease in quantity at the Contract Unit Price, except for Major Bid Item s as described below. A Major Bid Item is defined as a single Contract item constituting 10% or more of the original Total Contract Price. In the case of a decrease in a Major Bid Item, the following will apply:

Should the actual quantity of an item of work covered by a Contract Unit Price, and constructed with the Plans and Specifications, be less than 75 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per 3-3; however in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 75 percent of the Bid quantity at the Contract Unit Price.

Section 7-3.8 Eliminated Items

Should any Contract item be deleted in its entirety, payment will be made only for actual cost incurred for that item prior to notification of such deletion.

Section 7-4.
3 Makeup
Add the following:

Section 7-4.

3.1 Work by Contractor. The following percentages shall be the maximum allowed to be added to the Contractor’s costs and shall constitute the maximum markup for all overhead and profits:
1) Labor 15%
2)
Materials 10%
3) Equipment Rental 10%
4) Other Items and Expenditures 10%

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 138
2022–2023 PAVEMENT REHABILITATION PROJECT

E-18
To the sum of the costs and markups provided for in this subsection, 1 percent shall be added as compensation for bonding.

Section 7-4. 3.2 Work by Subcontractor.

When all or any part of the extra work is performed by a Subcontractor, the markup established in Section 7-4.3.1 shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work in excess of $5,000 of the subcontracted portion of the extra work may be added for the Contractor's costs and supervision.

Section 8
– No changes
Section 9– Claim Resolution Process
Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non -binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

For purposes of these procedures, “Claim” means a separate demand by the Contractor, after the Agency has denied Contractor’s timely and duly made request of payment in accordance with the Standard Specifications for (A) a time extension, (B) pay ment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Contract for a public work and payment of which is not otherwise entitled to, or (C) an amount the payment of which is disputed by the Agency.

The following requirements apply to all claims to which this section applies:

Section 10
– Potential Claims and Dispute Resolution
Add the following:

Section 10-1 Potential Claim
Any demand or assertion by the Contractor seeking an adjustment of Contract Price and/or Contract Time, or other relief, for any reason whatsoever, must be in strict compliance with the requirements of the Contract Documents. For purposes of this Section 10-1 , any and all work relating to any such demand or assertion shall be referred to as “Disputed Work,” regardless of whether the basis of the demand or assertion arises from an interpretation of the Contract Documents, an action or inaction of the Contractor, the Engineer, or the City, or any other event, issue, or circumstance. The Contractor shall bear all costs incurred in complying with the provisions of this Section 10-1.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 139
2022–2023 PAVEMENT REHABILITATION PROJECT

E-19
Promptly upon becoming aware of any event, issue, or circumstance including, but not limited to, disputes arising under the Contract, the acts or omissions of the Engineer or City or by operation of law, which the Contractor believes, in whole or in part, provides a basis for an adjustment of Contract Price and/or Contract Time. Or that Contractor’s performance is excused, or other relief, Contractor shall provide a signed written Initial Notice of Potential Claim to the Engineer in a format acceptable to the City. Contractor shall provide a signed written initial notice of potential claim to the Engineer within 5 days from the date the dispute first arose and before commencing any disputed work. The initial notice of potential claim shall provide the nature and circumstances involved in the dispute which shall remain consistent through the dispute. The initial notice of potential claim shall be submitted on Form CEM 6201A available on Caltrans’ website and shall be certified with reference to the California False Claims Act, Government Code Sections 12650 12655. Assign an exclusive identification number for each dispute, determined by chronological sequencing, based on the date of the dispute.

The exclusive identification number for each dispute shall be used on the following corresponding documents:

1. Initial notice of potential claim.

2. Supplemental notice of potential claim.

3. Full and final documentation of potential claim.

4. Corresponding claim included in the Contractor's written statement of claims.

Provide the Engineer the opportunity to examine the site of work within 5 days from the date of the initial notice of potential claim. Proceed with the performance of contract work unless otherwise specified or directed by the Engineer.

Throughout the disputed work, maintain records that provide a clear distinction between the incurred direct costs of disputed work and that of undisputed work. Allow the Engineer access to your project records deemed necessary by the Engineer to evaluate the potential claim within 20 days of the date of the Engineer's written request.

Within 15 days of submitting the initial notice of potential claim, submit a signed supplemental notice of potential claim to the Engineer that provides the following information:

1. The complete nature and circumstances of the dispute which caused the potential claim.

2. The contract provisions that provide the basis of claim.

3. The estimated cost of the potential claim, including an itemized breakdown of individual costs and how the estimate was determined.

4. A time impact analysis of the project schedule that illustrates the effect on the scheduled completion date due to schedule changes or disruptions where a request for adjustment of contract time is made.

Include your complete reasoning for additional compensation or adjustments.

Submit the supplemental notice of potential claim on Form CEM 6201B furnished by the Department and certify with reference to the California False Claims Act, Government Code Sections 12650 12655. The Engineer will evaluate the information presented in the supplemental notice of potential claim and provide a written response within 20 days of receipt. If the estimated cost or effect on the scheduled completion date changes, update information in items 3 and 4 above as soon as the change is recognized and submit this information to the Engineer.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 140
2022–2023 PAVEMENT REHABILITATION PROJECT

E-20
Within 30 days of the completion of work related to the potential claim, submit the full and final documentation of potential claim to the Engineer that provides the following information:

(1.) A detailed factual narration of events fully describing the nature and circumstances that caused the dispute, including, but not limited to, necessary dates, locations, and items of work affected by the dispute.
(2.) The specific provisions of the contract that support the potential claim and a statement of the reasons these provisions support and provide a basis for entitlement of the potential claim. (3.) When additional monetary compensation is requested, the exact amount requested calculated in conformance with the Contract Documents including an itemized breakdown of individual costs. These costs shall be segregated into the following cost categories:

3.1. Labor – A listing of individuals, classifications, regular hours and overtime hours worked, dates worked, and other pertinent information related to the requested reimbursement of labor costs.

3.2. Materials – Invoices, purchase orders, location of materials either stored or incorporated into the work, dates materials were transported to the project or incorporated into the work, and other pertinent information related to the requested reimbursement of material costs.

3.3. Equipment – Listing of detailed description (make, model, and serial number), hours of use, dates of use, and equipment rates. Equipment rates shall be at the applicable State rental rate as listed in the Department of Transportation publication entitled "Labor Surcharge and Equipment Rental Rates," in effect when the affected work related to the dispute was performed.

3.4. Other categories as specified by the Contractor or the Engineer.

(4.) When an adjustment of contract time is requested, include the following:

4.1. The specific dates for which contract time is being requested.

4.2. The specific reasons for entitlement to a contract time adjustment.

4.3. The specific provisions of the contract that provide the basis for the requested contract time adjustment.

4.4. A detailed time impact analysis of the project schedule. The time impact analysis shall show the effect of changes or disruptions on the scheduled completion date to demonstrate entitlement to a contract time adjustment.

(5.) The identification and copies of documents and the substance of oral communications that support the potential claim.

The full and final documentation of the potential claim shall be submitted on Form CEM 6201C furnished by the Department and shall be certified with reference to the California False Claims Act, Government Code Sections 12650 12655.

Pertinent information, references, arguments, and data to support the potential claim shall be included in the full and final documentation of potential claim. Information submitted subsequent to the full and final documentation submittal will not be considered. Information required in the full and final documentation of potential claim, as listed in items 1 to 5 above, that is not applicable to the dispute may be exempted as determined by the Engineer. No full and final documentation of potential claim will be considered that does not have the same nature and circumstances, and basis of claim as those specified on the initial and supplemental notices of potential claim.

If you, in conjunction with or subsequent to the assertion of a potential claim, request inspection and copying of documents or records in the possession of the City that pertain to the potential DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 141
2022–2023 PAVEMENT REHABILITATION PROJECT

E-21
claim, you must make your records of the project, as deemed by the City to be pertinent to the potential claim, available to the City for inspection and copying."

Unless otherwise specified, the Engineer will evaluate the information presented in the full and final documentation of potential claim and provide a written response within 30 days of receipt.

The Engineer's receipt of the full and final documentation of potential claim shall be evidenced by postal receipt or the Engineer's written receipt if delivered by hand. If you submit full and final documentation of potential claim after acceptance of the work by the City, the Engineer need not provide a written response.

10-2 D ispute Resolution
All disputes and claims arising under or by virtue of this contract shall be directed to and be determined by the Public Works Director. The Director’s determination can be appealed to City Manager or their designee. The determination by the City Manager or their designee of disputes and claims shall constitute the decision of the City of Goleta; provided, however, that Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3 of Division 2 of the Public Contract Code shall apply to the public works claim of $375,000 or less.

10-3 D
ispute Resolution - Claims exceeding $375,000
Any claim, dispute, or other matter in question arising out of or related to the Contract or Project exceeding three- hundred seventy -five thousand dollars ($375,000.00) that cannot be resolved between the City and the Contractor shall be resolved by the Santa Barbara County Superior Court.
10-4 C laims Procedures as a Prerequisite to Filing Suit Contractor acknowledges and agrees that its failure to submit any notice of potential claim or claim arising under this Contract in accordance with Section10, shall constitute a waiver of Contractor’s right to additional compensation and/or extension of time. Failure to follow the provisions set forth in this Contract shall constitute a waiver of Contractor’s right to receive any additional time or money as a result of any event giving rise to a claim or request for change order. Notwithstanding any other provisions in the Contract relating to any additional time or money which Contractor may be entitled to upon the occurrence of any directive or other event, or any other circumstance, Contractor must comply with the provisions of Section 10 to avoid a waiver of any such entitlement to any additional time or money. Contractor’s failure, neglect, or refusal to comply with the requirements of Section 10, or any portion thereof, shall bar Contractor’s request for additional compensation or adjustments to contract time. Such failure, neglect, or refusal prejudices the City’s and the Engineer’s ability to recognize and mitigate delay, and such failure, neglect, or refusal prevent the timely analysis of requests for adjustment of contract time, and whether such adjustments may be warranted. Contractor hereby waives all rights to additional compensation or adjustments of contract time due to delays or accelerations that result from or occur during periods of time for which Contractor fails, neglects, or refuses to fully comply with the requirements of Section 10.

Section 10-5 G
overnment Code Claims.

Notwithstanding Contractor’s participation in dispute resolution proceedings or other claims procedures under the Contract, such proceedings are in addition to Contractor’s obligation to present a written Government Code claim in accordance with Section 900 et al of the California Government Code, which is a prerequisite to filing a lawsuit for money or damages against the City. Contractor further acknowledges that notwithstanding Contractor’s compliance with the claims procedures set forth in Secti on 10or in the Contract Documents, such procedures are in DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 142
2022–2023 PAVEMENT REHABILITATION PROJECT

E-22
addition to Contractor’s obligation to comply with the claims procedures set forth in Government Code sections 900 et al prior to filing a lawsuit against the City for any such claim. Failure to submit a Government Code claim, or comply with the claims provision contained in Section 10 or in the City Special Provisions, shall bar Contractor from bringing and maintaining a valid lawsuit against the City.

Section 10-6 P
articipation in Dispute Resolution Proceedings.

Contractor and the City agree that all parties necessary to resolve a claim or dispute should be parties to the same dispute resolution proceeding. Contractor agrees upon request of the City to be joined in any mediation or arbitration when Contractor’s presence is required if complete relief is to be accorded and to prevent the possibility of conflicting rulings on a common issue of law or fact and otherwise to prevent the risk of the parties being subjected to inconsistent obligations or decisions.

Section 10-7
Contractor’s Continuing Obligations.

At all times during the processing of the Contractor’s potential Claim, including, but not limited to, in response to a work directive issued by the Engineer, the Contractor shall diligently proceed with the performance of the Disputed Work and other Work, unless otherwise specified or directed by the Engineer.

The Contractor shall provide the Engineer the opportunity to examine the site of the Disputed Work as soon as reasonably possible, and in no event later than five (5) days from the date of the Initial Notice of Potential Claim. Throughout the processing of the Contractor’s potential Claim, the Contractor shall provide the Engineer a reasonable opportunity to examine the site of the Disputed Work within five (5) days of the date of Engineer’s written request therefor.

The Contractor shall promptly respond to any requests for further information or documentation regarding the Contractor’s potential Claim.

Although not to be construed as proceeding with force account work, throughout the performance of the Disputed Work, the Contractor shall maintain daily records in accordance with the Contact Documents that provide a clear distinction between the incurred direct costs of Disputed Work and other Work. The Contractor shall allow the Engineer access to its project records deemed necessary by the Engineer to evaluate the potential Claim within fifteen (15) days of the date of the Engineer's written request.

All Subcontractor’s and material supplier’s claims of any type shall be brought only through Contractor pursuant to the provisions of this Section 10 and Contractor’s prior good faith review pursuant to the Contract Documents. Under no circumstances shall any Subcontractor or material supplier make any direct claim against City.

Except where provided by law, or elsewhere in these Contract Documents, THE CITY SHALL

NOT BE LIABLE FOR SPECIAL OR CONSEQUENTIAL DAMAGES AND THE CONTRACTOR SHALL NOT INCLUDE THEM IN ITS CLAIMS. Contractor shall be limite d in its recovery on any Claim(s) to the adjustments allowed in the Contract Documents.

During each step in the processing of the Contractor’s Claim, each notice shall be accompanied by the Contractor’s written statement that the adjustment or relief claimed is the entire adjustment or relief to which the claimant believes it is entitled as a result of the event, issue, or circumstance giving rise to the Claim.

Under no circumstances may the Contractor submit an Initial Notice of Potential Claim, Supplemental Notice of Potential Claim, or Notice of Final Claim after the date of final payment.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 143
2022–2023 PAVEMENT REHABILITATION PROJECT

E-23
Section 10-8 Notice of Third-Party Claims.

The City shall provide Contractor with prompt written notice of the receipt of any third- party claim relating to the Contract in accordance with Public Contract Code section 9201 by sending a copy of the third-party claim to Contractor at the address indicated in the Agreement via first class.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 144

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 145

SECTION F

CITY SPECIAL PROVISIONS
2022-2023 PAVEMENT REHABILITATION PROJECT

The Special Provisions contained herein have been prepared by or under the direction of the following registered engineers

Prepared by:

___________________________________________
Joseph L. Ririe, PE Date Senior Principal Engineer
Pavement Engineering, Inc.

Approved by:

___________________________________________
Charles W. Ebeling, PE TE Date Director of Public Works,
City of Goleta

April 14,2022
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 4/18/2022
146

THIS PAGE INTENTIONAL LEFT BLANK

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 147

TABLE OF CONTENTS

CITY SPECIAL PROVISIONS AND TECHNICAL SPECIFICATIONS

SECTION 900 GENERAL
SECTION 901 MOBILIZATION
SECTION 902 TRAFFIC CONTROL, PARKING RESTRICTIONS, AND SIGNAGE SECTION 903 WATER POLLUTION CONTROL PLAN (WPCP)
SECTION 904 MEASUREMENT AND PAYMENT
SECTION 905 ROADWAY PREPARATION
SECTION 906 COLD PLANING (MILLING & KEYCUTS)
SECTION 907 ASPHALT TACK COAT
SECTION 908 REMOVE ROOTS UNDER CONCRETE OR PAVEMENT REPAIRS SECTION 909 AGGREGATE BASE
SECTION 910 ASPHALT CONCRETE (AC)
SECTION 911 ASPHALT RUBBER HOT MIX (ARHM)
SECTION 912 QUICKLIME AND CEMENT TREATMENT
SECTION 913 LOWERING & ADJUSTING OF UTILITY COVERS
SECTION 914 TRAFFIC STRIPING, MARKINGS, & SIGNS
SECTION 916 MISCELLANEOUS CONCRETE
SECTION 917 TRAFFIC LOOPS
SECTION 918 DIGOUTS OR REMOVE & REPLACE AND COLD PLANE & REPLACE SECTION 919 CRACK SEAL
SECTION 920 SLURRY SEAL
SECTION 921 OVERSIDE DRAIN

APPENDIX A CURB RAMP SUMMARY TABLE

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 148

THIS PAGE INTENTIONALLY LEFT BLANK
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 149

SECTION 900 – GENERAL

900-1 G eneral Description of the Work
A. The work to be performed includes but is not limited to:

Furnishing all labor, materials, tools, and equipment necessary for placement of AC pavement materials such as ARHM pavement overlay, and AC mill and fill; pulverizing, treating, removal and disposal of the AC roadway section; replacement and compaction of subsurface material; setup and maintenance of traffic control systems; construction of PCC curb ramps & gutters, placement of crushed aggregate base and AC pavement; replacement of traffic striping and markings; and clean-up of project area; and other related work as necessary to provide a complete project; all in accordance with the Standard Specifications, General Provisions, plans, and these Special Provisions.

B. Existing improvements, visible at the Work or which can be reasonably ascertained by available information to exist, and which interfere with the completion of the Work but which no specific disposition is made on the Plans or Specifications, shall be addressed by the Contractor as follows:

1. Existing improvements which interfere with the completion of the Work shall be removed and replaced, in kind. The exact location and alignment of the replacement shall be confirmed with the Engineer prior to removal and adjustments to the location to conform to the Work shall be made as necessary.

2. The Engineer may determine that the existing improvements are to be removed and not replaced. Removed improvements shall be properly disposed of by the Contractor.

3. The area where existing improvements were removed shall be restored to conform with the Work and match the surrounding area. Restoration shall conform to adjacent improvements.

4. All costs for addressing proposed improvements in conjunction with existing improvements shall be included in the bid.

900-2 S
tandard Specifications and Details
A. The work provided herein must conform to and be in accordance with the Contract Plans, General Provisions and Special Provisions, as well as the Standard Specifications for Public Works Construction (”SSPWC”), written and promulgated by the Public Works Standards, Inc.; herein referred to as the “Standard Specifications”, the State of California Department of Transportation Standard Specifications; hereinafter referred to as the “State Standard Specifications”, California Manual on Uniform Traffic Control Devices (CMUTCD), City of Goleta Standards, and County of Santa Barbara Standards.

B. Whenever in the Contract Documents references are made to published specifications, codes, standards, or other requirements, it is understood that if a date is not specified, only the latest specifications, standards, or requirements of the respective issuing agency which have been published as of the date that the DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 150

Work is advertised for bids will apply; except to the extent that such standards or requirements may be in conflict with applicable laws, ordinances, or governing codes. No requirements set forth herein or shown on the drawings will be waived because of any provision of, or omission from, the standards or requirements.

900-3 O
rder of the Work
A. The Contractor must control operations such that the following conditions can be met:

GENERAL:

1. Contractor shall commence work per Construction Schedule and Commencement of Work. Contractor shall begin work promptly, as stated in General Provisions, and shall not suspend work or abandon site until job is complete.

2. All tree root removals and PCC repairs on any given street must be constructed and accepted by the Agency prior to full depth reclamation, or AC/ARHM resurfacing work.

3. At no time a milled pav ement surface shall be opened to traffic. Milled pavement surfaces shall be paved back with the asphalt concrete base or leveling course immediately after milling and base repairs (digouts) have been completed.

4. Coordinate, perform, and construct improvements per the Contract Documents. Contractor shall allow utility owners access to the work and shall schedule around interference by utility owners performing concurrent work.

5. Various items of concrete construction shall be installed or replaced shortly after demolition and removal has begun. In no case shall removal take place unless the Contractor can complete installation and replacement within the following time periods:
a. Sidewalk and access ramps shall be replaced no later than the third (3
rd) working day after demolition or removal.
b. Backfill and paving conform work shall be installed no later than the fifth (5
th) calendar day following concrete placement.
c. Sidewalks on both sides of a street shall not be closed or removed simultaneously.

Failure to complete such work within the time period and/or conditions stated shall be reasonable basis for the Engineer to stop all other items of construction until such work is completed.

6. Contractor shall coordinate with adjacent property owners/tenants in order to schedule demolition/construction activities in order to minimize impacts to residents and/or business operations.

900-4 R
equirements of the Work
A. All work must be coordinated with the Traffic Control Plan, Project Schedule, Contract Period, Su bmittals and other requirements of these Contract Documents.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 151

B. The Contractor must maintain a minimum of one lane, not less than twelve (12) feet wide, in each direction of travel at all times.

C. All movements at intersections must be maintained.

D. No lanes may be closed prior to 8:00 a.m. and all lanes must be opened by 4:00 p.m.

E. To allow for adequate intersection inspection of the work by the City and minimize impacts on surrounding neighborhoods the following contract items shall have the hours of work restricted as follows:

Various items of c onc
rete construction: No concrete shall be delivered prior to 8:00 a.m. and all concrete shall be placed prior to 3:00 p.m.

Early morning activities: N o heavy construction activities or motorized or electric equipment will be used prior to 8:00 a.m.

Storke Road: W
ork on Storke Road shall be restricted to between 8 :00 p.m and 6:00 a.m. or as otherwise established by the Engineer for overnight work.

Certain streets near schools require work hour restrictions: The streets shown in the appendices “School Zone Work Hour Restriction Map” and their associated schools are listed below. Contractor shall coordinate work in school zones by notifying schools and Engineer two weeks in advance of constructi on and not performing work during the restricted hours. Contractor shall not perform any work on the streets identified in the “School Zone Work Hour Restriction Map” before 8:30 a.m. and from 2:30 p.m. to 3:30 p.m.

T
he Contractor may request exceptions by submitting a traffic control plan to the Engineer for approval that shows that school pedestrians, bicycles, and vehicular traffic will not be adversely affected by the work. Requested exception does not guarantee excepted work will be allowed.

Elementary Schools:
• La Patera – 555 North La Patera Lane; (805) 681-1280

High School
• Dos Pueblos High School -- 7266 Alameda Ave; (805) 968-2541

F. A maximum noise level limit of eighty -six (86) decibels at a distance of fifty (50) feet will apply to all construction equipment on or related to the project whether owned by the Contractor or not. The use of excessively loud warning signals must be avoided except in those cases required for protection of personnel. The use of generators or other mechanical devices between the hours of 4:30 p.m. and 8:30 a.m. is not permitted unless approved by the Engineer.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 152

G. The City reserves the right to direct the order of work in the interest of public safety and convenience. The Engineer will endeavor to give the Contractor 72 hours - notice of any such directed order of work.

H. Coordinate, perform, and construct roadway work such that the restoration work on a street is completed prior to the weekend and/or holiday so the street and pedestrian walkways are fully restored and available for public use.

I. No work may be performed on Saturday, Sunday, or holidays unless approved in advance by the Engineer. Holidays are anticipated as follows:

Holiday: D
ate:

New Year’s Day (January 1)
Martin Luther King Day (3rd Monday in January)
Presidents Day (3rd Monday in February)
Memorial Day (last Monday in May)
Independence Day (July 4th)
Labor Day (1st Monday in September)
Veterans Day (November 11th)
Thanksgiving Day (4th Thursday in November)
Day after Thanksgiving (4th Friday in November)
Christmas Eve (December 24th)
Christmas Day (December 25th)
New Year’s Eve (December 31st)

Note: If a holiday falls on a weekend, a Saturday holiday will be observed on Friday and a Sunday holiday will be on a Monday. If part or all of a 2-day holiday falls on a weekend, the City will determine which 2 weekdays will be holidays.

No work will be allowed to be performed or be underway on the parade route or parade staging areas of the Goleta Christmas Parade, on the day of the parade.

Contractor shall clean-up work site, restore all surfaces and make full width of the roadway and right of way safe and available for traffic and pedestrians.

The holiday and event dates listed above are approximate dates and will vary depending on the year construction occurs. The Contractor is required to obtain and account for the City’s observed holiday dates and special event dates that will impact the project during the course of the Contract.

J. Contractor must reimburse City for costs for overtime inspection associated with project work hours. Costs will include hours in excess of 8- hours per workday shift, hours in excess of 40-hours per work week, and weekend and holiday work when specifically authorized.

K. Access to businesses shall be maintained at all times. Contractor shall coordinate with owners prior to street work.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 153

L. The Contractor must diligently pr osecute the contract work within the allowed number of working days specified in the Contract Documents. The days to finish the punch list, provided by the City, shall be included in the working days.

900-5 W ork Hours
A. Work shall be prosecuted during the following time period:
• Normal daily work hours are from 7:30 a.m. to 4:30 p.m. on:
o Cannongreen Drive Neighborhood – Base Bid
o Los Carneros Road (Cathedral Oaks Road to Calle Real) – Bid Alternarte A
o Storke Road (Hollister Avenue to Bollay Drive) – Bid Alternate B o Padova Drive (Salisbury Avenue to San Rossano Drive) – Bid Alternate D
o Newport Drive Neighbourhood – Bid Alternate H
o Armstrong Road (Reed Court to Mills Way)- Bid Alternate E o Hollister Avenue (West End to Cathedral Oaks Road) – Bid Alternate G
o Phelps Road (Pacific Oaks Rod to Storke Road) - Bid Alternate I o Phelps Road (Storke Road to End) – Bid Alternate J
o Cathedral Oaks (Evergreen Drive to A;ameda Avenue) – Bid Alternate K
o Storke Road (Hollister Avenue to 101 on ramp) – Bid Alternate M • Restricted work hours (before 8:30 am and from 2:30pm to 3:30pm) on:
o Covington Way Neighborhood – Bid Alternate C
Padova Drive (Alpine Drive to Alameda Avenue) – Bid Alternate E 900-6 P ublic Notification
A. At least seven (7) calendar days prior to beginning work, the Contractor must distribute notices to all residences, owners, businesses, and schools adjacent to or affected by the proposed work. In addition, the Contractor must notify property owners and adjacent neighborhoods in writing as directed by the City, 72 hours in advance of area specific work. Such notices must at minimum give the start date of the work, daily schedule for the proposed work, typical parking restriction for the work, the times of any restricted driveway access, impacts to residences and businesses, the Contractor's representative name and phone number, the City representative name and phone number, along with any other information requested by the Engineer.

B. Such notices must be prepared and printed by the Contractor, reviewed & approved by the Engineer, and must be served by the Contractor's representative in person to each residence and business. Failure of the Contractor to properly serve such notices will be cause for suspension of work until compliance with this requirement is achieved. No extension of time will be allowed to the Contractor for lost time due to his failure to distribute such notices in a timely manner or from suspension of work due to non- compliance. Contractor must document delivery of notices by providing an e-mailed list of locations where notices were delivered including the date and time of completion, by the end of the day of delivery.

Contractor must also e- mail a minimum of five c lear photos (2- megapixel) DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 154

showing completion of the delivery and parking restriction signs for each street notified. Contractor must send e- mail to an e- mail address as directed by Engineer.

C. The Contractor is responsible for and must deliver public notification for all phases of the work. The Contractor must submit for approval all notices for content and delivery schedule two weeks prior to actual delivery.

D. Full compensation for conforming to the requirements of this section will be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed.

E.

900-7 P
ermits
A. Before beginning work, Contractor must confirm with agencies having jurisdiction that Contractor has obtained all neces sary permits and licenses and given all notices.

B. Contractor must apply for, procure, and pay all charges and fees for all other necessary permits and licenses required to perform the work. Contractor is responsible for obtaining all necessary permits (not provided by City), reviewing the conditions and requirements contained therein, and including the cost of meeting these conditions and requirements in this bid. The original permits must be submitted to City and Contractor must maintain a copy of these permits at the job site at all times. All provisions of all project permits (including those provided by City and obtained by Contractor) will apply as though stated in these Specifications. Contractor must follow the more restrictive of the conditions, as determined by the Engineer, if there is a conflict. Any costs incurred due to compliance with these permits must be included in the contract costs. No additional payment will be made for such permits.

C. Any work in or affecting Caltrans right-of-way will require a Caltrans double permit.

Contractor must apply for and pay for this double permit when necessary.

D. Full compensation for conforming to the requirements of this section will be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed.

900-8 Fe
es and Fines
A. If the City receives a fine or penalty due to the Contractor’s actions or inactions, Contractor will be responsible to pay such cost. City may deduct such am ount from amounts due, or to become due the Contractor.

B. Prosecution of Work

1. Description of work parts subject to specific Liquidated Damages:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 155

The work part failures, time frame requirements, and liquidated damages are as follows:

Work Part Time Frame Liquidated
Damage
Failure to open lanes by 4:30 p.m. and as called for
in the Summary of Quantities for all phases of work.

For each hour
or part thereof
$200 per lane
Failure to perform work on a scheduled and noticed
street
Per
occurrence
$300 per street
Failure to post and notify businesses and residents
a minimum of 72 hours in advance of scheduled
work
Per
occurrence
$300 per street
Failure to place “No Parking” signs at specified
intervals
Per
occurrence
$300 per street
Failure to place temporary striping/first coat of paint for cross walks, stop bars and legends prior to
opening a street to traffic
For each day
or part thereof
$300 per street
Failure to place third and final coat of paint for
traffic striping and markings within three weeks of
placement of the AC surface course.

For each day
or part thereof
$300 per street
Failure to complete punch list items of work within
five working days of punch list receipt
For each day
or part thereof
$300 per street
Failure to provide flagmen, construction signage
and traffic control in conformance with the most
current California MUTCD.

For each
occurrence
$500 per day
Failure to provide a non -working Foreman for all
phases of work
For each day
or part thereof
$1,000 per day
Failure to have traffic control in -place prior to
commencement of any phase of work
For each day
or part thereof
$1,000 per
street
Failure to clean worksite of all construction
materials and debris at the end of each work day.

For each day
or part thereof
$200 per street
Failure to sweep street at Engineer’s request For each day or part thereof
$200 per street
Failure to complete the project within Contract
Period
Notice To
Proceed
$1,000 per
each
consecutive
calendar day in
excess of the
Contract
Period

900-9 R
eview of Contract Documents and Job Site
A. The Contractor must carefully study and compare each element of the Contract Documents with each other and with information available to the Contractor as

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 156

furnished by the City. The Contractor will assume all responsibility for deductions and conclusions as to the difficulties in performing the work.

B. The Plans show conditions as they are supposed, or believed by the City to exist.

The City does not warrant the completeness or accuracy of such information. It is the Contractor’s responsibility to ascertain the existence of all conditions affecting the cost of work. The Contractor must immediately notify the Engineer of errors, inconsistencies or omissions discovered. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Engineer, the Contractor will assume appropriate responsibility for such performance and will assume responsibility for the cost of correction.

900-10
Right-of-Way
A. Right of Way, easements or right -of-entry for the Work are included in t he appendix, if applicable.

B. The Contractor will not be entitled to the exclusive use of any public street or rights-of-way during the performance of the work under the contract, and the Contractor must conduct operations so as not to interfere unnecessari ly with business, traffic, pedestrians, and the authorized work of utility companies or other agencies in the street or rights -of-way. Neither the Specifications nor the Plans may be construed to entitle the Contractor to conduct operations within the rights-of-way which are in violation of any local, county, or state ordinance or regulation restricting interference with water courses and drainage channels. The Contractor must take adequate precaution against obstructing storm water flow within the project limits. The Contractor may not deposit excavated materials, store equipment or construction materials within the street.

900-11
Surveying
A. Attention is directed to Section 3-10, “Surveying” and Section 400-2 “Permanent Survey Markers” of the Standard Specifications and these Special Provisions.

Delete Section 3-10, “Surveying,” Section 400-2 “Permanent Survey Markers,” and Section 400-3 “Payment” of the Standard Specifications and substitute with the following:

B. Survey Monument Inventory: Contractor must prepare survey monument inventory of the project site, including any area affected by the work. Such inventory must be prepared by a Land Surveyor or Civil Engineer qualified to perform Land Surveying, licensed in the State of California. Survey monument inventory must be submitted to the Engineer one week prior to beginning any work that may affect a survey monument. Inventory must indicate location, monument description, how the monument is protected, location ties, a statement indicating that the survey monument inventory is a complete listing of survey monuments affected by the work, and must be signed and sealed by the Land Surveyor or Civil Engineer

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 157

C. Existing survey monuments located adjacent to and outside of construction areas must be adequately protected from any damage that may result from Contractor’s operations. Contractor must provide location ties to survey monuments in the work zone. Contractor must immediately notify the Engineer if any survey monument in the work area is accidentally disturbed or damaged. All survey monuments and monument wells damaged or displaced by Contractor’s operations must be reported to the County Surveyor. Contractor must replace disturbed or damaged survey monuments in accordance with the provisions of the Land Surveyor’s Act, Code of the State of California, at Contractor’s expense.

Prior to relocation or removal of any survey monument, Contractor must contact City for direction, at least 5 working days prior to relocating a survey monument.

Contractor must file required survey tie and monument records with the County Surveyor.

Payment
The cost of surveying, staking, and layout is to be included in the various items of work and no additional payment will be allowed.

900-12
Protection and Restoration of Existing Improvements
A. Attention is directed to Section 3- 12 “Work Site Maintenance,” Section 4- 2 “Protection,” and Section 400 “Protection and Restoration of Existing Improvements” of the Standard Specifications and these Special Provisions.

B. Contractor agrees to assume sole and complete responsibility for protection of public and private property in the vicinity of the job site and further agrees to, at Contractor's expense, repair or replace to original condition all existing improvements within or in the vicinity of the job site which are not designated for removal and which are damaged or removed as a result of Contractor's operations.

C. Repair or replacement must be completed within three (3) working days from the date the damage occurred, unless immediate repair or replacement is determined to be necessary by the Engineer. If the Contractor fails to restore existing improvements in a timely manner, within the timeframe specified, the City may complete the work and costs will be deducted from payments due the Contractor.

D. Contractor must coordinate operations such that damage to newly constructed improvements is avoided. In the event newly constructed improvements, shown on the Contract Documents, interfere with other project work or is necessary for safety or access and must be removed and replaced, the City will only pay for the improvements to be constructed one time. Multiple replacements or work necessary for the convenience of the Contractor will be considered performed at the Contractor’s expense.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 158

900-13 Utility Requirements and Potholing
General
A. Attention is directed to Section 402 “Utilities” of the Standard Specifications, the contract Plans, and these Special Provisions. The Contractor must verify the location, size, and type of all existing utilities prior to construction. Utilities include, but are not limited to; telephone, electricity, gas, fiber-optic cable, cable television lines, traffic signal systems, communication systems, petroleum lines, water, irrigation systems, storm drains and sanitary sewer.

B. When the Plans or Specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work must be included in the Bid for the items of work necessitating such work. Temporary or permanent relocation or alterations of utilities requested by the Contractor for its convenience are the Contractor’s responsibility and the Contractor must make all arrangements and bear all costs.

C. The Contractor must obtain all necessary permits and notify the utility agencies at least 48 hours in advance of excavating around any of their facilities. It is the responsibility of the Contractor to coordinate all phases of construction with the various utility companies involved.

D. The Contractor must notify Underground Service Alert at 811 at least 48 hours prior to any excavation or construction work. Paint indications for underground utilities must be limited to only those areas to be affected. The Contractor must document USA markings with photographs or video and must provide a copy of the photographs and video to the Engineer. The Contractor must remove any painting marks that remain after the construction is complete as follows:

When placing markings on the pavement or other right -of-way areas to indicate the location of underground facilities, Contractors and/or utility companies are required to use a temporary water based marking chalk with a visibility life not to exceed three (3) weeks. Contractor must arrange for markings to be removed as needed. In the event that a Contractor or utility company uses a non- approved marking material, it will be the responsibility of the Contractor to ensure the complete removal of all pavement markings remaining upon completion of the permitted work. If the Contractor fails to properly and completely remove all pavement markings, the City may affect the removal and deduct from payments due or become due the Contractor for both direct and indirec t costs as determined by the Engineer.

Utility Verification
A. The location and existence of utilities shown on the plans are approximate and taken from available records. The Contractor must verify the location of existing utilities, by potholing or other suitable methods, and must take all precautions to protect them whether shown or not. The exact location and identification of all DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 159

existing utilities must be determined by the Contractor prior to the start of any work.

B. The Contractor must physically locate, verifying horizontal and vertical locations, and map existing underground facilities within the work area that are marked by Underground Service Alert (USA), shown on the drawings or visible in the field.

Contractor must protect all such facilities from damage due to construction activities for the duration of the project. In the event any such unknown facilities or substructures should be disturbed or damaged due to the failure of the Contractor’s exercising reasonable care, the Contractor must at onc e make necessary emergency repair at no cost to and to the approval of the owner. In the event the utility owner requires its own forces or approved vendors to perform such repairs, Contractor must coordinate and cooperate with the utility to complete the repairs. All costs for repairs, staff time, direct and indirect costs, and any costs billed by the utility must be borne by the Contractor and costs may be deducted from payments due or to become due the Contractor. Contractor is responsible for following all applicable rules and regulations concerning work in the vicinity of underground and/or overhead utilities.

C. All utilities designated on the Plans to be protected in place must be carefully uncovered if located within the lines of excavation and time must be allowed for the Engineer to field check the location of such utilities to make certain that they will not interfere with construction. In the event a utility conflict exists, the City will either arrange for utility owner to relocate the utility or adjust grade and/or alignment of the proposed improvement. Contractor must allow sufficient time for this utility work and must adjust Contractor’s operation to move to other areas to allow the utility relocation work to occur.

D. In the event any such facility should be disturbed or damaged, the Contractor must at once make repairs to the satisfaction of the owner, or arrange with the owner to make repairs, at no cost to the City. Any delays or reconstruction of improvements resulting from the Contractor’s failure to verify utility locations and depths will be made at the Contractor’s expense.

Payment
The cost for coordination with the utility companies, providing work areas for utilities, locating facilities including potholing, protecting utility facilities in place, and conforming to the requirements of this section will be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed.

900-14
Subsurface Conditions
A. Where investigations of subsurface conditions have been made by the City with respect to subsurface conditions, utilities, foundation, or other structural designs, and that information is shown in the Plans, it represents only a statement by the City as to the character of materials which have actually been encountered by the DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 160

City’s investigation. This information is only included for the convenience of Bidders.

B. Investigations of subsurface conditions are made for the purpose of design only.

The City assumes no responsibility with respect to the sufficiency or accuracy of borings or of the log of test borings or other preliminary investigations or of the interpretation thereof. There is no guaranty, either expressed or implied, that the conditions indicated are representative of those existing throughout the Work, or any part of it, or that unanticipated conditions may not occur. When a log of test borings is included in the Plans, it is expressly understood and agreed that such log of test borings does not constitute a part of the Contract. The log of test borings represents only an opinion of the City as to the character of the materials to be encountered, and is included in the Plans only for the convenience of the Bidders.

Making information available to Bidders is not to be construed in any way as a waiver of the provisions of the first paragraph of this Section, and Bidders must satisfy themselves through their own investigations as to conditions to be encountered.

900-15
Pre-Construction Job Site Video
A. A minimum of one week prior to start of construction, the Contractor must video all areas where construction is to take place. Such videos (DVD or other approved media) must be provided to the Engineer before construction commences. These videos will serve a s a record of the existing conditions for disputes arising from restoration, and should therefore be taken along the line of construction and site access and staging areas at sufficient detail as necessary to clearly depict details of existing conditions. Video must document existing conditions, roadway, striping and all painted curb markings in the project area. All videos must be indexed and catalogued in such a manner that each photographed area is readily identifiable, and must also indicate the date and time (hour, minutes and seconds) on which the video was made. The Contractor must also video any unusual conditions encountered during construction that are not already a matter of photographic record. In the event damage to existing improvements occurs, the video will be available as a resource to determine existing conditions. In any areas where existing conditions cannot be determined by means of videos, the area must be restored as approved by the Engineer at Contractor’s expense. All videos will become the property of the City.

900-16 P
re -Construction Conference

A. A pre -construction meeting will be conducted prior to commencement of construction at a time and place designated by the Engineer. Those attending the meeting must include, but not be limited to, the following:

1. The Contractor and superintendent who will be supervising the work for the duration of the project.

2. The Sanitary and Water Districts, if applicable.

3. The Design Engineer

4. The Construction Engineer
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 161

5. Representatives of affected Utility Companies

B. Pre-construction conference will not be scheduled until the following has been submitted:

1. Construction Schedule

2. Traffic Control Plan

3. Water Pollution Control Plan (WPCP).

900-17 Weekly Project Schedule and Meetings
A. By Tuesday of each week, the Contractor must prepare and submit a detailed schedule of the work projected for the next two weeks on a daily basis. The Contractor must make revisions as required by the Engineer.

B. The Engineer will conduct a Weekly Project Status Meeting that must be attended by the Contractor, subcontractors, utility companies (as required) and the Engineer. The meeting will have duration of approximately one hour. The meeting will be held on the day, time and location as determined by Engineer. The purpose of this meeting will be to discuss interfacing work, scheduling, problems, issues, and the like. If not previously submitted, the Contractor must submit the following to the Engineer at the beginning of the meeting:

1. Daily manpower and equipment utilization for the preceding week

2. Projected work for the next two weeks on a daily basis.

The Contractor must attend all miscellaneous meetings as requested by the Engineer.

900-18
Project Schedule
A. Attention is directed to Section 6- 1.1 “Construction Schedule” of the Standard Specifications and these Special Provisions.

B. The Contractor must update the Construction Schedule as specified in the Standard Specifications, the General Conditions/Specifications, or when directed by the Engineer. Preparation and updating of the Construction Schedule must be performed at Contractor's sole expense.

C. Failure by the Contractor to submit updated or revised Construction Schedules when required may prevent acceptance of progress payment requests by the Engineer until such updated or revised Construction Schedules have been submitted for review and have been accepted by the Engineer.

D. The Construction Schedule must include obtaining all necessary materials and equipment, and must reflect completing all work within the specified time, in accordance with these Specifications. Contractor must show completion of the project completely filling the Contract time, and may not show early completion.

In the event, the Contractor requests early completion, Contractor must execute DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 162

a no- cost Contract Change Order that reduces the number of Working Days allowed for completion to conform with such intended completion date.

E. Contractor must include in the schedule, detailed information for each operation.

When the project includes multiple streets or sites, Contractor must include detailed information for each street or site. When notifications or parking restrictions are required such dates must be included in the schedule.

F. Contractor must provide critical path schedules in legible hardcopy format and must also submit schedules with each update in electronic format compatible with MS Project or Primavera, as directed by the Engineer.

Payment
Full compensation for the required construction schedules and conforming to the requirements of this section will be considered as included in the contract pr ices paid for the various items of work involved and no additional compensation will be allowed.

900-19
Coordination with Concurrent Projects
A. Several projects may be ongoing within the limits of the work during the Contract period. The Contractor is required to coordinate the work with other contractors such that both projects can be diligently pursued to their timely completion.

Interfacing work must be shown on the project schedule, and the Contractor will be responsible for meeting that schedule. Contractor must include time for others to perform work within the Work Area and this must be reflected in the Project Schedule. Delays due to interfacing with concurrent projects are considered avoidable and no compensation will be made for such delays. Contractor is responsible for obtaining contract documents including plans and specifications and thoroughly understanding the requirements of Work called for in the contract documents for concurrent projects. Contractor must include in the bid all costs for coordination, scheduling, meetings, staging and the like that result from interfacing with concurrent work.

B. Concurrent projects include but are not limited to the following:

1. City Project #9110 Hollister Class I Bike Path Lighting (on Hollister Avenue from Pacific Oaks Road to Pebble Beach Drive)

2. City Project #9099 Crosswalk at Calle Real/Fairview Center Pedestrian Hybrid Beacon (PHB)

3. 5800-2 Miscellaneous Concrete Repair (throughout the City)

900-20
Submittals
In addition to the required submittals and shop drawings of the Standard Specifications, the Contractor must submit the following shop drawings and/or submittals in adequate detail, including a list of all deviations from the Contract Documents for each item submitted. The Contractor must submit two (2) hard copies and an electronic pdf copy of the following items marked (*) to the Engineer for review DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 163

at least five (5) working days prior to the Pre- construction Meeting. All other submittals must be submitted in accordance with the submittal procedures listed below. The Engineer will determine if the specifications are being met for all work including but not limited to the following:

General Requirements
• Key Personnel, Telephone Numbers, and Emergency Telephone Numbers • Project Schedule*
• Traffic Control Plans*
• Demolition Waste Recycle Plan/Statement
• Public Notices

Site Work
• Portland Cement Concrete Mixes
• Quicklime/Cement Mixes
• Asphalt Concrete Mixes
• Aggregate Base
• Shoulder Backing
• Traffic Loops
• Detectible Warning Surfaces
• Traffic Stripe, Markers, and Marking Paint

Contractor must provide all submittals required by Special Provision sections.

900-21
Submittal Procedures
A. Wherever called for in the Contract Documents or where required by the Engineer, the Contractor must furnish to the Engineer for review two (2) hard copies and an electronic (pdf) copy of each submittal.

B. Each submittal item must be individually numbered and must identify the specification section that relates to item being submitted so that approved and rejected submittals can be tracked.

C. At the time of each submission, give Engineer specific written notice of each variation that the submittal may have from the requirements of the Contract Documents. If a variation is identified that was not brought to the attention of the Engineer, correction will be at the Contractor’s expense.

D. The Engineer will have a minimum of ten (10) working days to review each submittal except were specified differently in these special provisions. It is the responsibility of the Contractor to organize submittals in order of importance and need.

E. Submittals must be clearly identified and where multiple items are shown on a shop drawing, items being identified as submittals must be marked. Extraneous information should not be included in submittals. Only one submittal will be DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 164

reviewed for an item and Contractor may not submit multiple shop drawings from multiple vendors for the same item.

F. Engineer’s review will be only for conformance with the design concept of the project and for compliance with the information given in the Contract Documents, not extending to means, methods, techniques, sequences, or procedures of construction (except where indicated or required by the Contract Documents) nor to safety precautions or programs incident thereto. Submittals processed by Engineer do not become Contract Documents and are not Change Orders.

G. Delays caused by the need for re-submittal or replace unaccepted “or equal” items will not constitute a basis for claim.

H. In the event that an item is called for by a specific product or trade name, Contractor will have 35 days after the award of the Contract for submission of data substantiating a request for a substitution of “an equal” item. In the event Contractor furnishes any “or equal” material more expensive than that specified in the bid form, the difference in cost of such material so furnished will be bor ne by Contractor under Public Contract Code section 3400.

“Or equal” products may be accepted by the Engineer upon submittal of the following information:

1. Product Date Design Criteria

2. Physical Properties Limitations of Process

3. Material Specifications List of Previous Projects

4. Installation Specifications Size of Completed Projects

5. Testing Methods List of Current Projects

6. Third Party Test Data

7. Size of Current Projects

8. References (All references must include current names and telephone numbers).

9. List of all deviations from the specifications or referenced product or materials.

10. Additional testing may be required, and all costs for testing will be borne by Contractor.

I. City reserves the right to modify the procedures and requirements for submittals, as necessary to accomplish the specific purpose of each submittal. Direct inquiries regarding the procedure, purpose, or extent of any submittal to the Engineer.

J. Repetitive Review

1. Shop drawings and other submittals will be reviewed no more than twice at the City’s expense. All subsequent reviews will be performed at times convenient to the Engineer and at the Contractor’s expense, including but not limited to consultant costs, staff charges, overhead, and other related DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 165

expenses. Contractor shall reimburse the City for such costs, and City may deduct these costs from amounts due or to become due the Contractor.

Submittals are required until approved.

2. Any need for more than one resubmission, or any other delay in obtaining Engineer’s review of submittals, will not entitle Contractor to extension of the Contract Time.

900-22
Lump Sum Bid Items
A. The Contractor must submit a detailed schedule of values breakdown for all lump sum bid items. The breakdown of items must be submitted to the Engineer for approval and the level of detail will be as determined appropriate by the Engineer.

The schedule of values must be submitted to the Engineer prior to the first progress payment request and the progress payment will not be reviewed without approved schedule of values for all Lump Sum bid items. The schedule of values will be used as a basis for determining appropriate monthly progress payment amounts for lump sum bid items. The schedule of values must equal, in total, the lump sum bid item cost and be in such form and sufficiently detailed to satisfy the Engineer that it correctly represents a reasonable apportionment of the lump sum.

900-23
Daily Report
A. The Contractor must complete a Daily Report indicating manpower, major equipment used and on standby (itemized separately), subcontractors, materials used and similar items involved in the performance of the Work. The Daily Report must be completed on forms prepared by the Contractor and acceptable to the Engineer, and must be submitted to the Engineer prior to construction on the subsequent workday.

B. Contractor must supply daily reports to the inspector at the start of work on a daily basis. If the Contractor fails to provide daily reports for 2 or more working days during the scheduled work week, then a Stop Work Notice will be issued and progress payments will not be processed until all paperwork is current. Contract period will continue to be in force while the Stop Work Notice is in effect.

900-24
Testing and Inspection
A. Attention is directed to Section 3-5 “Inspection” and 4-4 “Testing” of the Standard Specifications., and these Special Provisions.

B. It is the responsibility of the Contractor to facilitate sampling to be used for testing purposes. Costs for failed tests and retesting necessary because of the Contractor’s failure to comply with specification requirements will be borne by the Contractor.

900-25
Non-Working Foreman
A. The Contractor must provide a non-working foreman for all phases of work for the duration of the Project. The non -working foreman must be available to the Engineer at all times. Failure to supply a non-working foreman at any time during DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 166

the Contract Period during work hours can result in an immediate Stop Work Notice until the Contractor provides or replaces the non- working foreman. The Contract Period will remain in force and continue. Any costs incurred by the City in dealing with issues resulting from work performed by the Contractor when a non-working foreman was not available will be deducted from payments due to Contractor. The City reserves the right to have the Contractor remove and replace non-complying work at no additional cost to the City.

900-26
Responsibility for Job Site Conditions
A. Contractor agrees that, in accordance with generally accepted construction practices, Contractor will be required to assume sole and complete responsibility for job site conditions during the course of construction of this Project including safety of all persons and property, and that this requirement will apply continuously and will not be limited to normal working hours. Contractor further agrees to defend, indemnify and hold the City and the City’s design and construction observation professionals harmless from all liability and claims, real or alleged, in connection with the performance of work on this Project.

B. The Contractor must make field measurements and verify field conditions and must carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered must be reported to the Engineer immediately by telephone and in writing. When conditions are encountered which, in the opinion of the Engineer, require temporary suspension of work for design modifications or for other determinations to be made, the Contractor must move to other areas of work until such determinations are made at no cost to the Owner. No additional compensation will be allowed by reason of such temporary suspension of a portion of the Work, or modifications to work. Appropriate extension of time for completion may be allowed where justified in the opinion of the Engineer. If articles having archeological significance are identified, the Contractor must suspend work to allow evaluation by the Engineer.

C. Provide and install non-skid steel plates at open trench excavations at the end of work day. Plates on arterial streets must be flush with adjacent pavement surface and secured as directed by Engineer in accordance with CALTRANS TR -0157 Method 1. Plates on other streets may be placed on pavement with temporary transitions as directed by Engineer in accordance with Caltrans TR-0157 Method

2. See Appendix A for Caltrans TR-0157.

900-27
General Safety Requirements
A. Contractor must do whatever work is necessary for safety and be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property during the Contract period. Safety provisions must conform to Federal and State Departments of Labor Occupational Safety and Health Act (OSHA), and other applicable Federal, State, County and local laws, ordinances, codes, requirements set forth herein, and regulations that may DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 167

be specified in other parts of these Contract Documents. Contractor must do all work necessary to protect the general public from hazards, including, but not limited to, surface irregularities or un- ramped grade changes in vehicular travel ways (including but not limited to streets, roads and driveways), pedestrian sidewalks or walkways. Barricades, lanterns, and proper signs must be furnished in sufficient amount to safeguard the public and the work. This requirement applies continuously and is not limited to normal working hours.

B. Contractor must develop and maintain for the duration of the Contract, a safety program that will effectively incorporate and implement required safety provisions.

The Contractor must appoint a qualified employee who is authorized to supervise and enforce compliance with the safety program.

900-28
Recoverable Materials
A. The City and/or the adjacent property owner owns all recoverable materials from the work. The City reserves the first right of refusal for recoverable materials with the existing public right-of-way. Likewise, the property owners reserves the first right of refusal for recoverable materials on their property . If the City/property owner refuses the recoverable materials, the Contractor must dispose of all recoverable materials in a proper and legal manner. The Contractor must include in the bid all costs for disposal. If the City decides to keep the material, the Contractor must deliver the material to a location determined by the Engineer within the City limits. Materials removed from the site without the expressed permission of the City will be back charged to the Contractor and deducted from funds due or to become due the Contractor. The City reserves the right to modify its decision regarding refusal up to the point in time the materials are removed from the site.

900-29
Project Appearance and Cleanup
A. The Contractor must keep the site clean, control dust from construction operations, provide sanitation for workers, and control air pollution from construction operations. Broken concrete and debris developed during demolition, clearing and grubbing must be disposed of concurrently with its removal.

B. Weeds, trash and debris must be removed from the work site regularly and when directed by the Engineer. Graffiti must be removed within 24- hours of the graffiti appearing and when directed by the Engineer. All graffiti within the project limits must be removed. Contractor must submit method of removal to the Engineer for approval prior to graffiti abatement. Stickers, paint, and other forms of graffiti must also be removed.

C. Upon completion of the Work and before the final inspection, the Contractor must at the Contractor’s own cost satisfactorily dispose of, or cause to be disposed of, all plant, buildings rubbish, waste product s, debris, unused materials, concrete forms, and other equipment used during the construction of the improvements. In the event that the Contractor fails to perform this final cleanup, the City may DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 168

remove and/or dispose of the articles or materials at the Contractor’s expense.

900-30 Differing Conditions
A. Contractor may not willfully install work as shown on the drawings when it is obvious in the field that obstructions, grade differences or differences in the area dimensions exist that might not have been considered or observed during design.

Contractor must promptly notify the Engineer and the agency having jurisdiction by telephone and in writing upon discovery of, and before disturbing, any physical conditions differing from those represented by approved plans and specifications.

In the event this notification is not performed, the Contractor must assume full responsibility for necessary revisions.

900-31
Final Inspection and Punchlist
A. Attention is directed to Section 6-8,1 “Acceptance” of the City General Provisions and these Special Provisions.

B. When the work has been completed, the Engineer will make the final inspection and final project walk -through with the Contractor. The Engineer will create a punch list of deficient items that need to be corrected by the Contractor. The Engineer reserves the right to add items to the project’s punch list as deemed necessary. All punch list items must be completed within 5 working days of notice to Contractor. Punch list items must be accounted for in the project construction schedule within the project working days. The Contractor will not be granted additional working days for the completion of the punch list items.

900-32
Construction As Built Drawings
A. The Contractor must maintain a complete and accurate record of all changes of construction from that shown in these plans and specifications for providing a basis for c onstruction as built drawings. These drawings must be maintained on- site during the course of construction and updated monthly, at minimum.

B. The Contractor must use a job set of contract drawings, clearly labeled “Construction As -Built Drawings,” to record all changes in construction.

Completely, accurately, and legibly mark the job set of as -built drawings in red ink to record actu al construction. Use additional copies of prints, if necessary, to ensure legible recording of data and date all entries. Call attention to the entry by drawing a “cloud” around the area affected. In case of overlapping changes, use different colors for each change. Maintain consistent color coding throughout the drawings.

C. The Contractor must submit a copy (11x17 or full size) of the updated construction as built drawings in progress with each progress payment to document the status of the drawings. Progress payments may not be processed until acce ptable drawings are submitted. The Contractor must submit a complete set of original construction as built drawings to the Engineer 10 days after final inspection along with a letter declaring that other than these noted changes on the as built drawings, DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 169

“the Project was constructed in conformance with the Contract Documents.” The Contractor must provide this set of as built drawing and letter prior to processing of the final pay estimate.

Payment
Full c ompensation for recording construction changes and furnishing the Construction As -Built Drawings is considered included in the prices paid for the various bid items of work and no additional compensation will be allowed.

900-33
Closeout Procedures
A. Attention is directed to SC 6-8.1 “Completion and Acceptance” and Section 7-3.2.1 “Request for Payment” City General Provisions and these Special Provisions.

B. Contractor must submit closeout submittals upon completion of work, including completion of punch list items, and at least seven (7) days prior to application for final payment, including, but not limited to the following:

1. Evidence of compliance with requirements of governing authorities.

2. Project record documents.

3. Operations and maintenance manuals.

4. Keys, spare parts, remotes and other required devices.

5. Warranties and bonds including an Increase Rider in the amount of final contract.

6. Evidence of payment and release of liens as outlined in conditions of the contract.

7. Survey record documents.

8. Final Release Form CC4 and signed “Acknowledgement of Final Closeout and Release of Claims”.

900-34 Measurement and Payment
Full compensation for work, other features, and conforming to the requirements of this Section 900, “General “, is considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed.

Work called for on the plans or required by the specifications, but for which no bid item exists is considered included in the prices paid for the various items of work and no separate payment will be made.

END OF SECTION 900
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 170

SECTION 901 – MOBILIZATION

901-01 General Requirements
Mobilization work will include all mobilization, demobilization, bonds, and insurance, preparatory and operations work necessary to provide for bonds, insurance, required permits and fees, submittals, shop drawings, project phasing, multiple move- ins and move- outs required to prosecute the work, supervis ion, coordination and concurrent work with other contractors, meetings, preparing “as- built” plans or record drawings, movement of personnel, equipment, supplies, and incidentals to and from the project site; the establishment of all other facilities necessary for work on the project; for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items of work at the project site; and work and improvements called for or implied by the Contract Documents, which are not included in the other bid items but are required to complete the Work.

901-02
Measurement and Payment
Payment for mobilization will be made at the contract lump sum price under the “Mobilization” Lump Sum price bid. This price will be considered full compensation for the furnishing of all materials and for all labor, equipment, tools, and incidentals necessary to complete the item.

A 25% payment of the lump sum total will be paid with the first progress payment and the remaining 75% will be paid incrementally over the life of the Contract where these subsequent payments will be based on the percentage of work completed to date.

END OF SECTION 901
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 171

SECTION 902 - TRAFFIC CONTROL, PARKING RESTRICTIONS, AND SIGNAGE

902-01 General
A. Traffic control must be coordinated to minimize inconvenience and maximize safety of the public during the construction period. Traffic control must be installed and in accordance with the California Manual on Uniform Traffic Control Devices (CMUTCD), Section 302- 4.5, 302- 10.4of the Standard Specifications and these Special Provisions. Traffic includes vehicles, bicycles, pedestrians and other modes of transportation.

B. All arterial streets (four or more lanes) traffic control must be performed by a sub-contracted company specializing in traffic control for street work possessing a C-31 License issued by the Contractor’s State License Board of the State of California.

C. Personal vehicles of the Contractor’s employees may not be parked on the traveled way or shoulders of the construction zone, including any section closed to public traffic. Employees’ personal vehicles may be parked on adjacent streets within the legal parking areas.

D. All haul routes must be submitted to the Engineer for review, and approved prior to the start of construction.

E. Contractor must allow access to emergency vehicles at all times.

F. When traffic cones or delineators are used to delineate a temporary edge of traveled way, the line of cones or delineators will be considered to be the edge of traveled way. However, the Contractor may not reduce the width of an existing lane to less than ten (10) feet without advanced written approval from the Engineer.

G. The Contractor must furnish and post signage with ample warning, where necessary, to inform the public about closures or restrictions on streets and at parking area entrances. All CMS must be locked and password protected.

H. Except as otherwise provided, the full width of the traveled way must be open for use by public traffic on Saturdays, Sundays, and designated legal holidays and when construction operations are not actively in progress.

I. Contractor must minimize the amount of time that traffic signals are not fully operational. Phase and coordinate work such that signals are without detection for only the minimum amount of time.

J. If a traffic loop is damaged, the Contractor must notify the Engineer immediately. Any traffic loop that is damaged or disconnected prematurely must be replaced within 48 hours of being damaged or disconnected at the DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 172

Contractor’s expense.

If any component in the traffic control system is damaged, displaced, or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor must immediately repair the component to its original condition, or replace such component and return it to its original location. Failure by the Contractor to continuously maintain the approved traffic control devices must be sufficient cause for the Engineer to stop all work protected by or associated with such traffic control devices.

K. Upon completion of the work in an area requir ing traffic control, all components of the traffic control system must be removed from the site of the work.

L. The Contractor is be fully responsible for maintaining all traffic control during the construction period and must furnish all traffic control equipment, signs, and barricades necessary to meet the requirements of these specifications, the direction of the Engineer and required to complete the project.

M. Contractor must install, test and maintain in operation “Vehicle Video Detection” (if applicable) prior to damaging or disconnecting any traffic loops.

902-02
Traffic Control Plan and Requirements
A. Prior to start of constr uction the Contractor must submit to the Engineer for approval a detailed plan for traffic control and signal coordination (when required) for the various construction operations.

B. The Traffic Control Plan must show all required barricading, flagman, signage, tapers, and traffic routing as may be required to maintain traffic circulation through, and in the vicinity of construction operations. The plan must show in detail how traffic will be routed through and around the construction site, including traffic from cross streets, alleys, and private drives. The plan must also show the location of signs that will provide advance warning to through traffic of street closure. The Traffic Control Plan must be prepared in accordance with the CMUTCD.

C. No construction operations may commence without prior review and approval of the Traffic Control Plan by the City Public Works Department and the Engineer. If the Traffic Control Plan requires Repetitive Review, each subsequent submittal of the Traffic Control Plan shall be signed and sealed by a Traffic Engineer experienced with Construction Work Zone Traffic Control, with current Registration in California.

D. The Engineer may require field alterations of the Traffic Control Plan as necessary to provide for the safety and convenience of public traffic. The Contractor must place, relocate or remove components of the traffic control system when directed by the Engineer, at no additional cost. Failure to comply with the approved Traffic Control Plan and any direction of the DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 173

Engineer will be grounds for immediate suspension of the construction operation until the Contractor makes such changes. If the Contractor fails to make required changes in the timeframe required, the Engineer may arrange for changes to the traffic control to be made by others and the cost to make such changes will be deducted from amounts due or to become due the Contractor.

E. As an integral part of the Traffic Control Plan, the Contractor must designate one person as Traffic Lead for traffic control. That person must be on the job site and available to the Engineer at all times during construction and for the duration of the project. The Traffic Lead must be in possession of a cellular phone at all times and the cellular number must be provided to Engineer to allow for communication at any time (24-hours per day). The Traffic Lead will be responsible for the proper placement and operation of all traffic control components and have available sufficient additional traffic control equipment in order to quickly execute any field changes as required for the safety of the public or as directed by the Engineer for the convenience of public traffic. The Traffic Lead must know and understand the CMUTCD. The Traffic Lead must have adequate personnel (a minimum of two) and other resources to promptly place and remove any traffic control components as required for the safety of the public or as directed by the Engineer.

F. Pedestrian access must be maintained at all times to all business, residences and buildings adjacent to Construction. The Contractor must, at minimum, provide pedestrian access on one side of the roadway with proper warnings and detours, and only when permitted by the Traffic Control Plan and approved by the Engineer. Under no circumstances may pedestrian access be restricted on both sides of a street simultaneously.

G. The Traffic Control Plan must be designed to handle traffic safely 24 hours per day, seven days per week for the duration of the Work. Traffic deviations, restrictions, detours, and roadway closure must be coordinated with Police and Fire authorities a minimum of 24 hours in advance of implementation.

H. Contractor must maintain traffic circulation at all times including, adequate flagging to accommodate public traffic as needed. Flaggers must be equipped in accordance with the Caltrans publication “Instruction to Flaggers;” each flagger must carry a Stop/Slow paddle at all times. Radios are required if distance between flaggers exceeds 200' or the distance eliminates line of sight. All costs for flaggers must be included in the contract item bid for Traffic Control.

I. Lanes may only be closed upon approval on the Engineer and with an approved Traffic Control Plan. Sufficient arrow boards, Changeable Message Signs and sufficient traffic control will be required. Lanes may only be closed when work is in progress and restrictions may only be in effect for the minimum amount of time necessary to perform the Work, as determined by the Engineer. Lane restriction near intersections shall be minimized and turn DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 174

pockets shall be returned to operation as soon as practicable and as directed by the Engineer.

J. Traffic restrictions may only be in place when work is in progress and traffic restrictions shall be removed as soon as practicable. Street c losures are to be avoided. Street closures require discretionary approval by the City Council and require significant justification and processing time and are typically not approved.

902-03
Construction Signage
A. Construction area signs must be furnished, installed, maintained, and removed when no longer required in accordance with the provisions of the CMUTCD, the traffic control plan as approved by the Engineer, and these Special Provisions.

B. Work must be performed in accordance with Sections 21400 and 21401 of the California Vehicle Code and its requirements for uniform traffic signs.

C. The base material of construction area signs must be steel or aluminum; no plywood or cardboard signs will be allowed. Signs must be full size; reduced size signs may not be used.

D. The contractor may also consider implementing changeable message signs (CMS) as needed in high traffic areas. If used, the CMS shall be included on the traffic control plan and installed no sooner than one week ahead of the work.

902-04
Street Work Requirements
A. Street surfaces must be restored and cleared of traffic control for the safe flow of traffic no later than 4:00 p.m. or the time listed in the Plans, these special provisions, or the time specified by the Engineer, whichever is more restrictive.

902-05
Parking Restriction
Parking restriction (no parking) signs posted by the Contractor shall be of heavy card stock and not less than 1.75 square feet of surface area on the face.

Background color shall be white and letter shall be printed in red water resistant ink except that day, date, and time of restriction may be printed in black, water resistant ink. The signs shall be printed with the words "Tow Away" and "No Parking" with a character height of not less than 1.5 inches and a stroke width of not less than 0.2 inches. The day, date, and time of the restriction shall be printed or attached below the above-mentioned wording in characters of not less than 1 inch in height and 0.15 inches in stroke width. The day of the week shall be written out or properly abbreviated with three to four letters; date or dates of restriction shall be listed completely; the beginning and ending times shall be clearly listed on the sign. Each sign shall also list the name of the Contractor and the Contractor's local phone number in characters of not less than 0.75- inch height; DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 175

the Contractor shall staff such phone lines to answer all phone inquiries by the public between the hours of 7 a.m. and 6 p.m. during construction. Alternate no parking signs will be considered by the Engineer and shall include all the above information and shall conform to one of the following combinations of standard sign plates: R26D + R30TA + R26E or R30TA + R30.

Signs shall be mounted such that the words 'No Parking' are at an elevation at least three feet and not more than seven feet above the adjacent flow line. Signs may be tied with string to trees and power poles, taped to existing sign poles, or mounted to stakes or barricades as provided by the Contractor. The signs shall be placed as needed to control the parking of cars within the construction zone; signs shall be placed at intervals of 75 feet or less along each side of the roadway for parallel parking and 40 feet or less for angle parking.

Signs shall be posted (depicting dates and times) and maintained by the Contractor for a minimum period of 72 hours prior to the restrictions becoming effective. The Contractor may only post parking restrictions, which are effective for the actual day of work as shown on the weekly schedule of work. The Contractor shall immediately place new signs when work is delayed or schedule changes. Upon completion of the work, all signs, stakes, and barricades shall be promptly and completely removed and disposed by the Contractor. The Contractor shall promptly reset or replace all missing, damaged or defective signs.

The Contractor shall be fully responsible for the adequate removal of all parked cars. All vehicle removal shall be coordinated by the Contractor with the Public Works Inspector. The Contractor shall notify the Public Works Inspector at (805) 968-6851 and the Police Communications Center at (805) 681-4100 upon posting of the parking restrictions for a street. For removal of parked vehicles, the Contractor shall notify the Public Works Inspector at (805) 968-6851 not less than two hours prior to the needed removal with the address nearest the parked vehicle, make, model, color, and license number. The City shall not be responsible for any delay or additional cost associated with the removal of parked cars, which obstruct the construction operation.

If a vehicle owner successfully contests a towing citation in court, and the citation is dismissed for caused related to the Contractor's failure to perform the requirements of this section, the Contractor shall reimburse the City for the cost of any claims associated with the towing citation and actual towing.

902-06
Temporary Pavement Markings
A. Wherever the Contractor's operations obliterate pavement delineation, (pavement delineation includes lane lines, stop bars, legends, symbols, crosswalks and school crosswalks; either pavement markers or painted lane lines, or both, parking lot legends, stall striping, and any other delineation), such pavement delineation must be replaced at the Contractor's expense by either permanent or temporary delineation, as required, before opening the traveled way to public traffic. Reflective traffic line tape or tabs must be DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 176

applied in accordance with the manufacturer’s instructions. Temporary delineation must be the same color as the permanent delineation. Tape or tabs can only be used for temporary lane lines, or they can be painted at the Contractor’s option, prior to the opening of traffic lanes.

B. A minimum of 3 -working days prior to the planned date for placing painted temporary or permanent striping and marking, Contractor must request the Engineer approve the “cat-tracking.”

902-07 M
easurement and Payment
The payment for “Bicycle, Pedestrian & Traffic Control” will be made on a LUMP SUM basis. The work must include full compensation for furnishing all labor including flagging costs, materials (including signs, barricades, delineators , CMS, and other warning devices), tools, equipment, and incidentals, for doing all the work involved in placing, removing, storing, maintaining, moving to new locations, replacing, and disposing of the components of the Traffic Control System, postings, notifications, street closures, temporary pavement delineation, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

END OF SECTION 902
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 177

SECTION 903 – WATER POLLUTION CONTROL PLAN (WPCP)

903-01 Ge neral
A. Attention is directed to Section 3- 12.6 “Water Pollution Control” of the Standard Specifications and these special provisions.

B. Discharges of stormwater from the project must comply with the permit issued by the Central Coast RWQCB for National Pollutant Discharge Elimination System (NPDES) Permit No. CAS000002, Permit No. (Order No. 2009-0009- DWQ). The Central Coast RWQCB permit governs stormwater and non- stormwater discharges resulting from construction activities in the project area. The Central Coast RWQCB permit may be viewed at Central Coast RWQCB office located at 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401.

C. The Contractor shall prepare and maintain a Stormwater Pollution Prevention Plan (SWPPP) or Water Pollution Control Plan (WPCP) on the form provided by the City, included in this specification, which describes in specific detail the Contractor’s program to prevent contamination of the stormwater collection system. Contractor shall implement, maintain, inspect and remove all erosion and sediment controls identified in the WPCP. The program shall address both common construction activities and extraordinary events.

D. Contractor shall include Water Pollution Control Drawings (WPCD) in the WPCP to illustrate the locations, applicati ons and deployment of best management practices (BMPs) identified in the WPCP. The WPCD shall be included as an attachment to the WPCP. Sample WPCDs can be obtained from the Caltrans Storm Water Quality Handbook. The WPCP shall also comply with the Central Coastal Regional Water Quality Control Board Phase II Municipal Separate Storm Sewer System Program (Order No. 2013- 0001 DWQ).

E. The Contractor shall comply with laws, rules, and regulations of the State of California and agencies of the United States Government prohibiting the pollution of lakes, wetlands, streams, or river waters from the dumping of contaminates, refuse, rubbish or debris.

F. T
he Contractor shall submit one copy of the WPCP a minimum of 10 working days prior to beginning construction. Construction shall not begin until the WPCP is approved. Contractor shall update the WPCP as necessary during the work to prevent contamination of the stormwater collection system.

G
. Before start of work, Contractor shall train all employees and subcontractors on the WPCP and related WPCD.

H. Suggested BMPs can be obtained from the following sources:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 178

1. Central Coastal Regional Water Quality Control Board Phase II Municipal Separate Storm Sewer System Program /Order 2013- 0001 at Central Coast Regional Water Quality Control Board web site at:
https://www.waterboards.ca.gov/centralcoast/ and

https://countyofsb.org/pwd/sbpcw/water-quality/storm-water- management.sbc

2. California Stormwater BMP Handbooks for Construction or Municipal Activities - www.cabmphandbooks.com

3-. Caltrans’ Stormwater Quality Handbooks -
http://www.dot.ca.gov/hq/construc/stormwater/stormwater1.htm

903-02 C
onstruction
A. The Contractor shall keep a copy of the WPCP on the job site. The Contractor shall provide continuously at the jobsite all of the tools, equipment, and materials necessary to implement the WPCP at all times from project initiation through completion, including any punchlist or warranty work on the project. At a minimum the following requirements should be met as applicable, to the maximum extent practicable, at construction sites regardless of size:

B. Storm Drain System Protection – At the first order of work, the Contractor shall protect the existing storm drain system from entrance of construction debris and pollutants. Such protection shall include implementing the BMPs as outlined in the WPCP. Protection shall prohibit the discharge of untreated runof f from temporary or permanent street maintenance/landscape maintenance material and waste storage areas from entering the storm drain system. Sediment that is generated on the project site shall be retained using structural drainage controls.

In addition, the protection system shall have a minimum of three features: 1) a particulate filter of geosynthetic material securely fastened in place such that it cannot be bypassed without significant physical damage; 2) a pre- filter for the particulate filter; and 3) on-hand materials to close off the inlet or opening in the case of a significant pollution spill. Contractor shall monitor and maintain all storm drain inlet protection devices during rain events to prevent flooding.

In addition to the BMPs outlined in the City of Goleta Stormwater Guidance Document, the protection system shall have a minimum of three features:

1) A particulate filter of geosynthetic material securely fastened in place such that it cannot be bypassed without significant physical damage, 2) A pre-filter for the particulate filter, and
3) On-hand materials to close off the inlet or opening in the case of a significant pollution spill.

C. Material Management & Storage – No construction- related materials, wastes, spills or residues shall be discharged from the project site to streets, drainage facilities or adjacent properties by wind or runoff. All materials and/or equipment storage areas where liquid construction materials are DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 179

placed shall be protected by a physical barrier capable of containing the entire volume of stored liquid materials. During active construction activities, portions of the barrier may be removed for access. However, the barrier materials must be readily accessible for replacement by onsite constructi on personnel. The barrier must be in place at all times during the absence of Contractor personnel at the storage site. Building materials should be placed on pallets and covered in event of rain. Do not store materials in the street or gutter area.

D. Equipment & Vehicle Maintenance – Non-stormwater runoff from equipment and vehicle washing and any other activity shall be contained at the project site and shall not be allowed to discharge from the project site to streets, drainage facilities or adjacent properties by wind or runoff. The Contractor shall inspect vehicles and equipment on each day of use. Leaks shall be repaired off-site if possible. If necessary to repair on site, the runoff must be contained or the problem vehicle or equipment shall be removed from the project site until repaired. If necessary, drip pans should be placed under the vehicles or equipment while not in use to catch and/or contain drips and leaks.

E. Soil Erosion Control – Erosion from slopes and channels will be significantly reduced by implementing BMPs, including but not limited to, minimizing grading activities during the wet season, inspecting graded areas during rain events, planting and maintaining vegetation on slopes, and covering slopes susceptible to erosion.

F. S
pill Prevention & Cleanup Plan - Contractor shall have a spill prevention plan and spill cleanup materials readily available and addressed in the WPCP. Spills shall be cleaned up immediately using dry methods if possible.

Spill cleanup material shall be properly disposed of. Refer t o SC-11 Spill Prevention BMP from the California Stormwater BMP Handbook for Municipal Activities. Contractor shall keep a record of any spills in the inspection log.

In addition, at the end of the project, the Contractor must certify that all contaminated materials have been properly disposed in accordance with the WPCP.

G
. Asphalt & Concrete & Related Activities – Contractor shall implement the following BMPs:

1. Restrict paving/repaving activity to exclude periods of rainfall or predicted rainfall unless required by emergency conditions.

2. Install sand bags or gravel bags and filter fabric at all susceptible storm drain inlets and at manholes to prevent spills of paving products and tack coat.

3. Prevent the discharge of release agents including soybean oil, other oils, or diesel to the storm drain system or receiving waters.

4. Minimize non -stormwater runoff from water use for the roller and for evaporative cooling of the asphalt.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 180

5. Clean equipment over absorbent pads, drip pans, plastic sheeting or other material to capture all spillage and dispose of properly.

6. Collect liquid waste in a container, with a secure lid, for transport to a maintenance facility to be reused, recycled or disposed of properly.

7. Collect solid waste by vacuuming or sweeping and securing in an appropriate container for transport to a maintenance facility to be reused, recycled, or disposed of properly.

8. Cover the cold mix, asphalt, materials (i.e., pre- mixed aggregate and asphalt binder) with protective sheeting during a rainstorm.

9. Cover loads with tarp before haul-off to a storage site, and do not overload trucks.

10. Minimized airborne dust by using water spray during grinding

11. Avoid stockpiling soil, sand, sediment, asphalt material and asphalt grinding material or rubble in or near storm water drainage systems or receiving waters.

12. Protect stockpiles with a cover or sediment barriers during a rain event.

H. Sidewalk Washing – The following methods should be utilized to prevent discharge of sidewalk cleaning wastewater into the storm drain system:

1. Sweep and pick up all areas to be cleaned before using water.

2. Manually scrape gum from sidewalks and other surfaces. 3 Use a wet/dry vacuum to collect wash water for disposal. Large volumes of wash water may require the use of a small sump pump to remove wash water from the job site.

4. One or more of the following methods are recommended to prevent pollutants from entering the storm drain system:
• Sandbags can be used to create a barrier around storm drains. * • Rubber mats or plugs can be used to seal drain openings. * • Temporary berms or containment pads help keep water on site. * • Use berms of sandbags to direct wash water to landscaping. * • Use large squeegees to accumulate sheet flow for collection. *Remember to remove plugs, berms, and sandbags or you may be liable for possible flooding.

5. Wash water that may contain hazardous waste such as oil -saturated absorbents, water with lead or other heavy metals from oxidized paint, and solvent cleaners requires special treatment and must be disposed of through a hazardous waste facility.

I. Employee BMP Training – Contractor shall train employees and subcontractors on BMP implementation, general good housekeeping, and proper spill containment and cleanup. Before start of work, Contractor shall provide City with written documentation of training and keep all documentation in the WPCP.

J. Removal of Accumulated Rainwater – The Contractor shall follow the City of Goleta Guidelines for Removal of Rainwater that has accumulated on the job site.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 181

903-03 Measurement and Payment
A. The Contractor shall be paid for work of preparing, implementing, inspecting, maintaining, and removing the WPCP on a lump sum basis as shown in the Bid Schedule for the Water Pollution Control Plan. In addition, failure to perform and document the required daily inspections shall result in a daily liquidated damage of $250/calendar day. This liquidated damage shall be in addition to any other liquidated damage. The imposition of the penalty shall not relieve the Contractor of any obligations of these project requirements.

B. Payment for the work involved under the bid item for the Water Pollution Control Plan may be made on a partial payment system based on the completion of the following stages of work:

W
ork Description Payment
Develop Plan 10% of Bid Price
Initial Plan Implementation 10% of Bid Price
Removal of BMPs at Completion 10% of Bid Price
Inspection & Maintenance of WPCP 70% of Bid Price

C. Payment for the WPCP shall include all the labor, materials, equipment, and incidentals for preparing, maintaining, and updating a WPCP and complying with all provisions including maintenance and updating of BMPs throughout construction, as specified herein.

D. Fines and penalties from regulatory agencies levied against the City as a result of the Contractor’s work, including actions or inactions shall be the responsibility of the Contractor and may be deducted from payment s due or to become due the Contractor.

END OF SECTION 903
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 182

SECTION 904 – MEASUREMENT AND PAYMENT

904-1 – General
A. Measurement will be in accordance with Standard Specification unless otherwise specified.

Bid Item List Abbreviations
Abbreviation Meaning
CF cubic foot
CY cubic yard
EA each
(F) final pay item
GAL gallon
HR hour
LB pound
LF linear foot
LS lump sum
SF square foot
SY square yard
TON 2,000 pounds

B. When an item of work is designated as (F) in the bid schedule, then the item shall be a final pay item for payment purposes only. For a final pay item, payment shall be based on the quantity shown in the bid schedule for that item, regardless of the actual quantity used, unless the item quantity is changed by the Engineer.

904-2 –
Payment
Payment for the various items of the Bid Schedule, as further specified herein, shall include all compensation to be received by the Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of work being described, as necessary to complete the various items of work as specified and shown on the drawings, including all appurtenances thereto complete and in place, and including all costs of compliance with the regulations of public agencies having jurisdiction.

END OF SECTION 904
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 183

SECTION 905 – ROADWAY PREPARATION

905 -01 Scope
Roadway Preparation shall conform with Section 300- 1 of the Standard Specifications, and as modified by the following Special Provisions, and the plans.

The work under this section consists of preparing the roadway prior to the resurfacing or reconstruction. Such work shall include controlling nuisance water, sweeping, watering, removal of all raised pavement markers, removing thermoplastic pavement markers, removing rubber speed bumps and storing them at a safe location agreeable to the City until replacement, and removing loose and broken asphalt concrete pavement and foreign material, including existing weed growth as specified in these Special Provisions and as required by the Engineer.

The Storm Water Pollution Control Program is to be implemented prior to the start of work. Any roadway area that contains existing weed growth shall be treated with an Environmental Protection Agency (EPA) approved herbic ide composed of glyphosate and oryzalin, combined and applied according to label directions.

CONTRACTOR'S attention is especially directed to Sections 7- 8, "Project Site Maintenance," 7-9, "Protection and Restoration of Existing Improvements," and 7- 10, "Public Convenience and Safety" of the Standard Specifications, which shall be strictly adhered to. (A bid item is included herein for Traffic Control for all project work.)

Removal and Disposal of Materials
Attention is directed to Section 300 -1, “Clearing and Grubbing” of the Standard Specifications and these Special Provisions. Add the following:

Existing soil, rock, and vegetation shall be removed and disposed as required to accommodate the construction of the various types of miscellaneous concrete improvements and associated placement of aggregate base or sand bedding.

The Contractor shall prune roots per the City Arborist. Tree roots shall not be cut indiscriminately with a root saw. Roots shall be cut by hand using a chain saw when encountered in excavation. Roots found to be growing above the grading plane shall be removed to a depth of six inches below the grading plane. Removal of roots shall be considered as included in the various items of concrete construction and no additional compensation will be allowed therefor. Debris from root removal operations shall become the property of the Contractor and shall be legally disposed of.

Concrete Removal
Concrete shall be defined as all or portions of mortared rubble masonry, brick or stone curbs, gutters and sidewalks; and Portland cement concrete curbs, gutters, sidewalks, gutter depressions, driveways, aprons, slope paving, island paving,

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 184

barriers, retaining walls, spillways, dams, structures, foundations, footings, and all other Portland cement concrete or masonry construction.

Concrete sidewalks, driveways, and curb and gutters shall be removed to the nearest expansion joint, contraction joint, score mark, or as otherwise directed by the Engineer. Contraction joints and score marks are to be saw cut to the depth of the existing concrete. The Contractor shall layout saw cut lines a minimum of two working days prior to saw cutting and shall notify the Engineer to verify proper location.

Where portions of existing asphalt concrete surfacing or concrete curb and gutter or sidewalk are to be removed, the outline of the area to be removed shall be cut on a neat line with a power -driven saw to a minimum depth of 0.25 foot before removing the surfacing.

Any and all concrete sludge generated during saw cutting shall be removed simultaneously with a suitable wet -dry vacuum and properly disposed of. Failure to sufficiently remove and properly dispose of concrete sludge would be a violation of the City’s W ater Pollution Control Program, and may result in associated penalties.

Street lighting conduit, irrigation lines, and utility services are often located within the areas indicated for sidewalk removal. The Contractor shall work with the utilities and the adjacent property owners to locate and identify all conflicting lines.

Any lines, conduits, and services damaged by the Contractor shall be repaired and service restored immediately at the Contractor's expense. All parkway areas not included in the landscape planting areas shall be restored to their original condition including any replanting, re-sodding, backfilling and re-grading.

At locations indicated on the plans and at other locations to be determined by the Engineer, the Contractor shall saw cut, remove, and recycle existing concrete, including base course and other hardscape improvements. The contractor shall recycle all demolished concrete to ensure that none of the material will be disposed of at a landfill.

Prior to starting work, the Contractor shall submit a plan to be approved by t he Engineer that demonstrates that all concrete generated from the project will be recycled. The Contractor shall provide to the Engineer weigh tickets or other evidence that the material to be recycled has been disposed of at a recycling facility.

Asphalt Concrete Removal
Any existing asphalt pavement section adjoining any of the concrete improvements to be replaced shall be removed to a minimum of one and one half (1 ½) feet outside of the limits of the concrete improvements. Concrete or concrete base shall be removed only with specific approval of the Engineer.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 185

At locations indicated on the plans and at other locations to be determined by the Engineer, the Contractor shall saw cut, remove, and recycle existing asphalt concrete including base course and other hardscape improvements. The contractor shall recycle all demolished asphalt concrete to ensure that none of the material will be disposed of at a landfill. Prior to starting work, the Contractor shall submit a plan to be approved by the Engineer that demonstrates that all a sphalt concrete generated from the project will be recycled. The Contractor shall provide to the Engineer weigh tickets or other evidence that the material to be recycled has been disposed of at a recycling facility.

Unclassified Excavation
Attention is directed to Sec tion 300-2, "Unclassified Excavation", of the Standard Specifications and these Special Provisions.

The Contractor shall perform all excavation necessary to perform the required work. The excavation shall include the removal and disposal of all materials of whatever nature encountered, which shall include both rock and common excavation, including all obstructions that would interfere with the proper construction and completion of the work, and shall include the furnishing, placing, and maintaining of shoring and bracing necessary to safely support the sides of the excavations.

The Contractor shall dispose of all excess excavated material at his own expense (except materials determined to be hazardous which shall be paid for as approved extra work), and in accordance with an approved hauling plan.

905-02
Payment
Payment for Roadway Preparation shall be at the contract unit price per lump sum listed in the bid schedule. This work shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all work involved in clearing and grubbing / demolition, includin g but not limited to the removal and disposal of all existing materials within the work site, roadway excavation, unclassified excavation, sawcutting, root cutting, demolition of existing asphalt and concrete improvements, and all work as may be required by the Contract Documents, as shown on the plans, as specified herein, and as directed by the Engineer.

905
-03 Subgrade Prep and Placement of Base Materials
Subgrade Preparation
The subgrade shall be cut to grade and proof rolled in order to detect isolated unstable areas. Any areas found to be yielding shall be stabilized. If unstable soils are encountered at any time during the grading operation, stabilization will be required prior to placement of aggregate base. Stabilization, if required, shall consist of removing soft, spongy or otherwise unsuitable materials to firm unyielding soil and backfilling with crushed aggregate base.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 186

Measurement and Payment
Payment for subgrade preparation shall be considered included in the unit price for the bid item for which the subgrade is prepared, and no additional compensation shall be allowed therefor.

END OF SECTION 905
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 187

SECTION 906 – COLD PLANING (MILLING & KEYCUTS)

906-01 Scope
The existing pavement adjacent to existing gutters, cross gutters or at the ends of overlays, at equipment crossings and at bridge approaches shall be cold planed as specified herein. Limits of cold planing will be determined by the Engineer prior to construction. The depths and dimensions of the cold planing and keycuts are designated on the Plans. Cold planing will be used for removal of existing pavement on those roadways designated for cold planing and replacement of the asphalt concrete, and may be used for Digouts.

The CONTRACTOR shall schedule the work such that permanent paving shall be completed within 5 working days after cold planing and within 5 working days after quicklime & cement treatment. The CONTRACTOR shall schedule the cold planing work such that the pavement levelling course (base course) can be completed immediately after milling and digouts are complete.

Milled pavement surfaces shall not be opened to traffic and all traffic lanes shall be open for traffic outside the approved work hours.

906-02
Equipment
The machine used for planing shall have performed satisfactorily on similar work and shall meet the following requirements:

The planing machine shall be specially designed and built for planing of bituminous pavements without the addition of heat. It shall have the ability to plane Portland Cement Concrete patches in the bituminous pavement or Portland Cement Concrete pavements. The cutting drum shall be a minimum of thirty (30) inches wide and shall be equipped with carbide tip cutting teeth placed in a variable lacing pattern to produce the desired finish.

The machine shall be capable of being operated at speeds of 0 to 40 feet per minute; it shall be self -propelled and have the capability of spraying water at the cutting drum to m inimize dust. The machine shall be capable of removing the material next to the gutter of the pavement being reconditioned and so designed that the operator thereof can at all times observe the planing operation without leaving the controls. The machine shall be adjustable as to slope and depth.

The CONTRACTOR's attention is directed to Subsection 7- 8.2 "Air Pollution Control" of the Standard Specifications.

906-03
Construction
Prior to cold planing on streets to be milled, all utility covers shall be lowered such that the cutting teeth of the planing machine passes over the adjusted lid without causing damage to the lid or frame. CONTRACTOR will be responsible for DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 188

maintaining any temporary asphaltic fill material over these facilities until the final paving surface is installed.

CONTRACTOR shall remove as shown in the keycut details included in these Technical Provisions. Remaining material around utility covers and at gutter lips shall be removed to the depth of the adjacent milled surface after completion of cold planing. If pavement against utility covers, gutter lips, or other features, cannot be removed by the planing machine, CONTRACTOR shall use other means to remove this material.

The pavement surface after cold planing shall be uniformly rough. The grade shall not deviate from a suitable straight edge more than 1/4 inch at any point. When multiple passes are required to create the cold planed surface, the maximum variation from a stringline or straight edge shall be 1/4 inch high to 1/2 inch low.

High points out of tolerance shall be replaned to fall within tolerance. Low areas shall be filled with asphalt concrete as specified herein to meet tolerances. The cost of such correction of low areas shall be entirely the Contractor’s.

The work shall consist of preparing the existing street surfaces prior to the commencement of paving. Such work shall include removing raised pavement markers, removing all thermoplastic and paint traffic marki ngs and legends, controlling nuisance water, sweeping, watering, and removing loose and broken asphalt concrete pavement and foreign material; and the spraying and removal of weed growth as specified in the Standard Specifications and these Technical Provisions, and as directed by the Engineer. Any roadway area that contains existing weed growth shall be treated with an E.P.A. approved herbicide composed of glyphosate and oryzalin, combined and applied according to label directions.

Contractor shall provide the record of amount used for the project.

The pavement areas designated to be replaced shall be removed to a uniform depth as specified, and may be removed either by cold planing or by full depth sawcutting and mechanical removal. Sawcutting is not necessary if the pavement is removed by cold planing. Any broken or damaged pavement edges shall be re- cut prior to paving. All removed material shall be cleared from the site.

Water for cold milling shall be provided by the CONTRACTOR and shall be considered integral to cold milling in terms of payment.

On intersections where the plans call for cold milling and replacing the asphalt concrete, the CONTRACTOR shall only remove what can be paved back during the same work period.

906-04
Removal and Disposal of Material
During the planing operation, the CONTRACTOR shall sweep the street with mechanical equipment and remove all loosened material from the project site until completion of the removal work. The CONTRACTOR shall take all necessary measures to avoid dispersion of dust. CONTRACTOR shall notify the Engineer for approval of swept surface prior to Tack Coat application.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 189

In addition to removing the cold milled asphalt concrete, the CONTRACTOR shall remove any slurry seal or asphalt concrete which is adhered to the top of the adjacent gutter, cross gutter or spandrel.

906-05
Temporary Transitions
In addition to the provisions of Subsection 302- 5.2 of the SSPWC, the CONTRACTOR shall construct temporary pavement transitions at all cold milled areas greater than 1 inch prior to allowing traffic onto the cold milled areas. This includes both longitudinal and transverse directions. This also includes PCC facilities around corners from beginning of curb return to end of curb return, PCC cross gutters and PCC spandrels. Temporary pavement transitions shall have a slope of 20:1 or as approved by the engineer and be constructed on Kraft paper or other suitable bond breaker such that upon removal of the temporary pavement transition, a clean notch remains. The temporary transitions shall be constructed of hot mix.

The CONTRACTOR shall continuously maintain the temporary pavement until final paving. Each temporary transition shall be inspected by the CONTRACTOR and repaired as necessary to comply with these provisions at the end of each day including weekends and holidays.

Failure to comply with these provisions will result in a liquidated damage per day per transition and/or the cost of City crews making the repairs if necessary to correct for public safety.

906-06
Measurement and Payment
Payment for “Type A1 Keycut (See Plan and Detail)”, “Type A2 Keycut (See Plan and Detail)”, “Type B1 Keycut (See Plan and Detail)”, “Type B2 Keycut (See Plan and Detail)” will be measured along the edge of the adjacent curb, gutter, cross gutter, or pavement, and paid for on a lineal foot basis.

Cold Planing on roadways to be milled will be measured and paid for on a square foot basis.

The above contract prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, removal, transportation, disposal, and incidentals; and for performing all of the work involved as detailed in the Standard Spec ifications, these Special Provisions, and the plans and typical sections. No additional compensation will be allowed therefor.

END OF SECTION 906
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 190

SECTION 907 – ASPHALT TACK COAT

907-01 Scope
Work to be performed under this Section covers all labor, materials, tools, equipment and incidentals necessary to furnish and apply, complete in place tack coat in conjunction the asphalt concrete overlay and other asphalt paving work. All such work shall conform to the applicable provisions of the Standard Specifications, and these Special Provisions.

907-02
Materials
The tack coat shall be SS-1h. A certificate of compliance shall be submitted prior to construction.

907-03 Construction
The tack coat shall not be applied until the preparation of the existing surface has been completed, and then only so far in advance of placing the asphalt concrete overlay as permitted by the Engineer / Inspector. No tack coat shall be left exposed overnight. Imme diately in advance of placing the asphalt concrete overlay additional tack coat shall be applied, as directed by the Engineer to areas where the tack coat has been destroyed or otherwise rendered ineffective, and no additional compensation will be allowed for such work.

Tack coat shall be applied to all vertical edges after every lift of asphalt. Vertical edges shall be tack coated by hand wand or manually by brush. The tack coat application shall not extend above the level of the finished surface by more than 1 inch. Gutter pans and curb faces not to be tack coated shall be protected by shields or other methods. An overspray beyond the 1 inch shall be removed by means approved by the Engineer.

Existing concrete curb faces and driveways shall be protected against disfigurement from the asphalt. Residue of the material shall be removed from curb faces and driveways by sandblasting to the extent required by the Engineer.

The tack coat shall be applied as specified in Subsection 302-5.4 of the Standard Specifications and these Special Provisions. Tack coat shall not be applied when the temperature of the surface to be tacked is below 40° Fahrenheit in the shade.

The asphalt binder emulsion for use as a binder (tack coat) shal l be applied at the rate of 0.15 gallons per square yard (to the entire resurfacing area designated for new pavement).

The CONTRACTOR shall be responsible for cleaning tack coat tracked onto decorative concrete crosswalks or thermoplastic legends and crossbars within the project limits and along truck haul routes used by the CONTRACTOR or his SUBCONTRACTORS. The haul routes shall be inspected by the City and CONTRACTOR prior to initiating work to photographically establish the existing

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 191

conditions. Wi thin 10 calendar days of completion of final paving, the City and CONTRACTOR shall reinspect the haul routes to determine the extent and locations of required cleaning. Cleaning shall be performed within 10 calendar days after the City delivers a written copy of the locations of required cleaning.

Failure to meet this schedule, whether to reinspect or to perform cleaning, shall subject the CONTRACTOR to a liquidated damage of $500 per calendar day per location.

907-04
Measurement and Payment
No separate payment will be made for work or other features as required and outlined in this Section, "Asphalt Tack Coat." Full compensation for such work and features shall be considered included in the price bid for asphalt concrete pavement bid items (e.g. AC-C2, AC-D2, ARHM-GG-D, digouts) and no additional compensation will be allowed therefore. Such payment shall be considered full compensation for furnishing and maintaining all materials, labor, equipment, and all incidentals necessary to complete the work in accor dance with the Standard Specifications and these Special Provisions.

END OF SECTION 907

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 192

SECTION 908 – REMOVE ROOTS UNDER CONCRETE OR PAVEMENT REPAIRS

908-01 General
All tree roots under the concrete to be repaired shall be removed as described herein.

This item includes root removal where trees have been previously removed. The CONTRACTOR shall coordinate with and receive approval from City Arborist for all root pruning / trimming.

908-02
Construction
The Contractor shall remove all tree roots under the concrete or pavement to be repaired to a depth of twelve inches below the subgrade. All roots encountered within the repair area shall be cut by hand (i.e. chain saw, hand pruners, hand saw, axe, etc.) or a root pruner approved by the Engineer at the limits of the repairs prior to their removal. Root removal by other mechanical means (i.e. trencher, backhoe, loader, etc.) is specifically prohibited. Any damage done to adjacent concrete or other improvements due to the failure to sever roots at the limits of the repair shall be repaired at the Contractor’s expense.

The area where roots have been removed shall be backfilled with native material or Class 2 Aggregate Base. The area to be backfilled shall be scarified prior to the addition of backfill and shall be compacted to 90% relative compaction under concrete repairs and 95% under pavement repairs. The limits of root removal shall be 10 feet to each side of the t ree or shrub causing the damage unless otherwise authorized by the Engineer.

City Arborist must be present during the cutting of all tree roots.

908-03
Measurement and Payment
No separate payment will be made for work or other features as required and outlined in this Section, " Prune & Remove Tree Roots ”. Full compensation for such work and features shall be considered included in the price bid for as phalt concrete pavement or Portland cement concrete bid items and no additional compensation will be allowed therefore. Such payment shall be considered full compensation for locating, severing and removing roots; supplying, installing and compacting backf ill, and all incidentals necessary to complete the work in accordance with the Standard Specifications and these Special Provisions.

END OF SECTION 908

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 193

SECTION 910 – ASPHALT CONCRETE (AC)

910-01 Scope
Work to be performed under this Section covers all labor, materials, tools, equipment, transportation, and incidentals necessary to construct asphalt concrete. All such work shall conform to the dimensions of the plans, the applicable provisions of the Standard Specifications, and these Special Provisions.

910-02
Materials
Material used shall be asphalt concrete as specified in Subsection 203- 6 of the Standard Specifications. The class of combined aggregate grading shall be Class C2 or D2 as shown on the Typical Sections. The grade of asphalt shall be PG 64-10.

The mix properties indicated in Table 203-6.4.3(A) shall be modified as follows:

Mix
Design
and
Production
Stability
Target Air
Voids
Production
Air Voids
C2 37 min. 4.0% 2.5% - 5.5%
D2 30 min. 4.0% 2.5% - 5.5%

TSR to be minimum 70 in accordance with Caltrans Test Methods 371. In lieu of the TSR requirements, the suppler may add 0.5% of anti -strip. No warm mix additives allowed.

910-03
Construction
The work shall further consist of preparing the existing street surfaces prior to the paving. Such work shall include removing raised pavement markers, removing thermoplastic pavement markers, painted legends and crossbars (12” white and yellow), controlling nuisance water, sweeping prior to tack application, watering, and removing loose and broken asphalt concrete pavement and foreign material as specified in the Standard Specifications and these Special Provisions and as required by the Engineer. The minimum ambient temperature to begin paving shall be 55 degrees F. The CONTRACTOR shall use any means necessary to clean the pavement, including sweeping and flushing.

The paving shall be performed in such a way as to not leave any longitudinal paving joints at the end of each day’s operation. Longitudinal paving joints shall be wedge type and shall be constructed as shown on the plan details. The longitudinal paving joint layout shall be submitted to the Engineer for approval and shall be reviewed at the pre-paving meeting.

1 . Cold Joints
All cold joints, both longitudinal and transverse, shall be heated with a torch immediately prior to paving. Care shall be exercised such as to not damage the asphalt

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 194

concrete by burning or excessive aging, as determined by engineer. Damaged material shall be removed by saw cutting to form a new cold joint followed by torch heating.

Cold joints include previous passes placed more than three hours prior. All cold joints shall be tack coated.

2. Le
veling Transitions and Asphalt Concrete Fills
A leveling course of variable thickness shall be placed and compacted prior to placing the surface course at locations where directed by the Engineer. The leveling course will be used to correct pavement irregularities such as rutting, variable cross slope, or variable longitudinal slope. Where two overlays of different thickness abut at a longitudinal joint, the CONTRACTOR shall add to the thinner section to match the thicker lift and provide a smooth transition and uniform cross-fall. Cold planing ridges or other rises in the pavement surface may be required by the Engineer. The Engineer will determine the exact limits and thickness of the leveling courses, asphalt concrete fills, and transitions. Areas to receive AC Fill shall be completed prior to performing leveling course work. CONTRACTOR shall perform AC Fills to improve surface drainage as shown on the plans and as directed by the Engineer.

3 . Layout
The CONTRACTOR shall layout and mark the location of the edges of the paving passes of the surface course to match the new layout of the lane lines. The layout shall be made at least 24 hours prior to paving. The layout shall be approved by the Engineer prior to paving.

If the striping is to remain unchanged, the edges of the paving passes shall conform to existing lane edges.

In all cases where practical, each lane shall be paved in a single pass. In tapered transition areas, the shoulder areas shall be paved first, then the through lane shall be hotlapped immediately after the shoulder paving.

For paving which incorporates new quarterpoints or gradebreaks due to keycuts or other conditions, the CONTRACTOR shall provide equipment capable of adjusting to the new surface profile at the appropriate locations. The profile adjustments shall be within twelve inches of the actual quarterpoint or gradebreak.

The CONTRACTOR shall take sufficient measurements during laydown to assure that the full design asphalt concrete layer depth is provided at each quarterpoint, gradebreak, or transition. Failure to provide the design depth at these areas will result in rejection of the work. Correction of this rejected work will include milling out the new asphalt concrete from the road edge to the centerline or nearest inside lane line and repaving. The minimum length of the milled and corrected area shall be fifty feet.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 195

4. Tolerances
The finished asphalt concrete surface shall be flush with, to 1/4 inch (0.02 feet) (6 mm) above the gutter lips. The finished pavement surface shall not be lower than the gutter lips.

The average pavement thickness shall be equal to the specified thickness for the project. For total pavement thicknesses less than four inches, the minimum allow able thickness will be 1/4 inch less than that specified. For total pavement thicknesses of four inches or more, the minimum allowable thickness will be 1/2 inch less than that specified.

The provisions of Section 302- 5.6.2 shall apply and shall be modified to provide that the straightedge shall be 12 foot in length.

5 . Additional Pavement Placement Equipment
In addition to Green Book 2015 Section 302-5.5, Contractor shall provide the use of an Asphalt Material Transfer Vehicle (a.k.a. a Shuttle Buggie) during the placement of all finish course materials on Arterial Streets.

6 . Automatic Screed Controls
For all main line street or roadway paving with single lane length exceeding 300 feet, automatic screed controls shall be required.

In addition to the requirements in Subsection 39-1.10 of the 2010 State of California Department of Transportation Standard Specifications (Unrevised), asphalt concrete shall be placed with spreading equipment equipped with fully automatic screed and grade sensing controls which shall control the longitudinal grade of the screed.

Automatic controls shall conform to and be operated in accordance with the provisions herein.

Unless approved otherwise, ski-type devices with a minimum length of 30 feet shall be used to provide a reference for the grade sensor. Skis shall be constructed and installed in such a manner that a reference to the average elevation of the existing pavement, along the length of the ski, is maintained at the sensor point. When placing surfacing adjacent to surfacing previously placed in conformance with these provisions, a joint matching shoe of adequate size and type to properly sense the grade of the previously placed mat may be used in lieu of the 30-foot ski.

The ski shall be mounted at a location which will provide an accurate reference for the surfacing being placed. This may require the ski to be mounted ahead of and inside the outer limits of the screed. Automatic cross slope control may be accomplished by use of a ski and grade sensor on each side of the paving machine.

Automatic screed controls shall be installed in such a manner that the occasional manual adjustments necessary to maintain the attitude of the screed parallel to the underlying pavement are readily accomplished. Automatic screed controls shall be DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 196

installed so that with little or no delay, use of the automatic controls can be discontinued and the screed controlled by manual methods.

Should the automatic screed controls fail to operate properly during any day’s work, the CONTRACTOR may manually control the spreading equipment for the remainder of that day provided the quality of the work conforms to the requirements of Sections 39-1.11 and 39-1.12 of the 2010 State of California Department of Transportation Standard Specifications (Unrevised). Should the methods and equipment used for automatic control fail to result in the quality of work required by said Sections 39-1.11 and 39-1.12, the paving operations will be temporarily discontinued and the CONTRACTOR shall make the necessary changes to the equipment, or furnish other equipment conforming to the requirements herein, before paving is resumed.

If it is determined by the Engineer that the existing grade and cross slope are too irregular for the automatic controls to provide the quality of work required, the use of the automatic controls shall be discontinued and the spreading equipment adjusted by manual methods. Use of automatic controls shall resume when the Engineer has determined that it is again practical and so orders.

7. R
olling and Compaction
In addition to the requirements of Subsection 39- 1.11 of the 2010 State of California Department of Transportation Standard Specifications (unrevised), the number of rollers required for each paving operation shall be such that all rolling for density can be completed before the temperature of the asphalt concrete mixture drops below 140 degrees Fahrenheit.

Breakdown rolling shall commence when the asphalt concrete is placed except in cases where mix distortion/shoving rather than compaction is taking place under the roller. In those instances, wait for the mix to cool to sufficiently, then breakdown compact. Rolling shall be accomplished with the drive wheel forward and with the advance and return passes in the same line.

On areas where the underlying material appears to be wet or soft or where it deflects under wheel loads, the Contractor shall employ excavation and work techniques which do not worsen the sub-grade condition.

Prior to placing aggregate base or Hot Mix Asphalt, each pavement replacement area shall be proof -rolled with a loaded construction vehicle, preferably a ten cubic yard dump truck or equivalent. The compacted surface shall not visibly yield or deflect. Soft, yielding, unstable, or unsuitable areas shall be removed and replaced with base rock or Hot Mix Asphalt. If the areas were caused or significantly worsened by the Contractor’s operations, these areas shall be replaced at the Contractor’s expense.

In the event that the underlying material is soft, yielding, unstable, or unsuitable, it shall be excavated to a depth of 0.5 feet below the depth required above and disposed of in accordance with these Special Provisions. The limits of removal shall be designated by the Engineer. The resulting space shall be filled with a single lift of Hot Mix Asphalt.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 197

Unsuitable material is defined as material the Engineer determines to be:

1. Of such unstable nature as to be incapable of being compacted to specified density using ordinary methods at optimum moisture content, or

2. Too wet to be properly compacted and circumstances prevent in- place drying prior to incorporation into the work, or

3. Otherwise unsuitable for the planned use.

Care shall be taken to assure compaction of the inside corners of the first lift. Ramping shall not be allowed on the course placed immediately prior to the surface course.

A minimum of two lifts shall be used for each replacement area or digout with a depth greater than three inches. The surface course shall be 1- 1/2 inches minimum thickness. No single base or intermediate course may exceed three inches.

For leveling courses under 1 inch using a D2 asphalt concrete, breakdown rolling shall consist of three coverages with an 8 to 12- ton pneumatic roller followed by a finishing coverage with a steel wheel roller. The rolling may begin with a single pass of a steel wheel roller until the pneumatic has sufficient opportunity to warm up to avoid tracking and picking up material from the mat. The pneumatic roller tires shall be treated with a non-petroleum-based product to prevent pickup. Failure to successfully provide for breakdown rolling with the pneumatic roller after a reasonable warm up time will be cause for termination of paving activities until the CONTRACTOR can provide equipment which will perf orm without pickup. For all other leveling courses, the intermediate roller shall be a 12-16-ton pneumatic roller.

From the second paragraph of Section 302-5.6.2 “Density and Smoothness” to the end shall be deleted and replaced by the following:

Sublots to determine compaction testing shall be based on the following:

• Each 750 tons, or part thereof, placed on an individual street in a paving day. If over 750 tons are placed in a single paving day on an individual street, up to 150 tons over 750 tons can be moved in to the previous 750 ton sublot.

• If multiple streets a re paved in a day, each street will be considered its own sublot with multiple sublots on streets where greater than 750 tons are placed.

The in-place density shall be between 92.0 percent and 97.0 percent of maximum theoretical unit weight using a nuclear gauge. Gauge compaction testing shall be performed in accordance with CTM 375. Final compaction is based on the average nuclear gauge results for the sublot. The nuclear gauge will be core correlated the first day of paving.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 198

If nucl ear gauge compaction testing results are failing, the contractor can request coring to verify the results. Three cores will be sampled for each sublot and the average of the three cores for each sublot will determine density. The core locations will be determined using random sampling charts in CTM 375. The engineer will mark the core locations.

Cores may be taken up to 5 calendar days after placement and may be 4 or 6 inches in diameter. The engineer will provide results within 3 working days of receiving the cores.

Passing cores shall be paid for by the owner. Failing cores will be paid for by the contractor. If the core density produces both passing and failing cores, the cost will be prorated between the contractor and the owner.

Contractor shall backfill cores with hot mix AC the same day cores are taken.

Failure to backfill on the same day will subject the Contractor to liquidated damages in the amount of $250 per day per location.

For the percent of maximum theoretical density, the following table shall apply to deductions for average compaction of a sublot:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 199

Reduced Payment Factors for Percent of Maximum Theoretical Density

Mix Type B
and C2
Percent of
Maximum
Theoretical
Density
Reduced
Payment
Factor
Mix Type B
and C2
Percent of
Maximum
Theoretical
Density
Reduced
Payment
Factor

92.0 0.0000 97.0 0.0000

91.9 0.0125 97.1 0.0125

91.8 0.0250 97.2 0.0250

91.7 0.0375 97.3 0.0375

91.6 0.0500 97.4 0.0500

91.5 0.0625 97.5 0.0625

91.4 0.0750 97.6 0.0750

91.3 0.0875 97.7 0.0875

91.2 0.1000 97.8 0.1000

91.1 0.1125 97.9 0.1125

91.0 0.1250 98.0 0.1250

90.9 0.1375 98.1 0.1375

90.8 0.1500 98.2 0.1500

90.7 0.1625 98.3 0.1625

90.6 0.1750 98.4 0.1750

90.5 0.1875 98.5 0.1875

90.4 0.2000 98.6 0.2000

90.3 0.2125 98.7 0.2125

90.2 0.2250 98.8 0.2250

90.1 0.2375 98.9 0.2375

90.0 0.2500 99.0 0.2500
<90.0 Remove &
Replace
Remove &
Replace

The CONTRACTOR shall have hand-compaction equipment immediately available for compacting all areas inaccessible to rollers. Hand- compaction shall be performed concurrently with breakdown rolling. If for any reason hand- compaction falls behind breakdown rolling, further placement of asphalt concrete shall be suspended until hand-compaction is caught up. Hand- compaction includes vibraplates and hand tampers. Hand torches shall be available for rework of areas which have cooled.

After compaction, the surface texture of all hand work areas shall match the surface texture of the machine placed mat. Any course or segregated areas shall be corrected immediately upon discovery. Failure to immediately address these areas shall cause suspension of asphalt concrete placement until the areas are satisfactorily addressed, unless otherwise allowed by the Engineer.

The CONTRACTOR shall have hand-compaction equipment immediately available for compacting all areas inaccessible to rollers. Hand- compaction shall be performed DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 200

concurrently with breakdown rolling. If for any reason hand- compaction falls behind breakdown rolling, further placement of asphalt concrete shall be suspended until hand-compaction is caught up. Hand- compaction includes vibraplates and hand tampers. Hand torches shall be available for rework of areas which have cooled.

After compaction, the surface texture of all hand work areas shall match the surface texture of the machine placed mat. Any course or segregated areas shall be corrected immediately upon discovery. Failure to immediately address these areas shall cause suspension of asphalt concrete placement until the areas are satisfactorily addressed, unless otherwise allowed by the Engineer.

8. S
ampling
The Engineer may sample the asphalt concrete from the truck bed, windrow, hopper for the spreading machine, or the mat at various intervals. The CONTRACTOR shall facilitate the sampling process.

9. T
emporary Transitions
The CONTRACTOR shall construct temporary pavement transitions at all paving joints greater than 1 inch prior to allowing traffic onto the paved surface. This includes both longitudinal and transverse paving joints for both leveling and surface courses.

Temporary pavement transitions shall have a slope of 20:1 or as approved by the engineer and be constructed on Kraft paper or other suitable bond breaker such tha t upon removal of the temporary pavement transition, a clean notch remains. The temporary transitions may be constructed of either cold mix or hot mix.

The CONTRACTOR shall construct temporary pavement transitions at all PCC facility transitions greater than 1 inch around corners from beginning of curb return to end of curb return, at PCC cross gutters, and PCC spandrels.

The CONTRACTOR shall continuously maintain the temporary pavement until final paving. Each temporary transition shall be inspected by t he CONTRACTOR and repaired as necessary to comply with these provisions at the end of each day including weekends and holidays.

Failure to comply with these provisions will result in a liquidated damage per day per transition and/or the cost of City crews making the repairs if necessary to correct for public safety.

10 . Quality Control
The Contractor shall provide full time quality control during paving operations as outlined in the Caltrans 2010 Standard Specifications (Unrevised) for the Standard construction process.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 201

910-04 Measurement and Payment
The measurement and payment for asphalt concrete “AC C2 PG 64 -10” and “AC D2 PG 64-10” , complete in place, will be made at the contract unit price per ton (U.S. standard measure, 2,000 pounds) as shown in the Bid Schedule for the various types of asphalt concrete. Asphalt concrete used in other items of work, including but not limited to digouts, shall be included in the respective bid items.

The measurement and payment for asphalt concrete “Remove & Replac e AC Berm”, will be made at the contract unit price per Linear Foot as shown in the Bid Schedule.

The measurement and payment for asphalt concrete “Remove & Replace Speed Hump”, will be made at the contract unit price per Each as shown in the Bid Schedule.

The above contract price and payment shall include full compensation for furnishing all labor, materials, tools, equipment, transportation and incidentals, and for doing all the work involved in constructing asphalt concrete pavement, tack coat, including leveling course, complete as detailed, and as specified in the Standard Specifications and these Special Provisions.

Contractor shall include in the unit price all cost s relating to submitting the JMF including all testing costs for JMF verification and quality control testing. The unit price includes the cost of providing the Contractor’s Quality Control Plan. The Contractor shall pay all the cost of coring if requested to verify density by cores. The City will pay cost of testing cores.

END OF SECTION 910

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 202

SECTION 911 – ASPHALT RUBBER HOT MIX (ARHM)

911-01 Scope
Asphalt-rubber hot mix shall conform to the specifications of 203- 11 of the Standard Specifications, Asphalt Rubber Hot Mix (ARHM) Wet Process, except as modified herein. Placement of ARHM shall conform to Section 302- 9 of the Standard Specifications except as modified herein.

911-02
Materials

1. Asphalt Rubber Binder
The binder to be mixed with the aggregate shall conform to Section 203- 11.2 of the Standard Specifications. The asphalt binder base stock prior to blending shall be PG 64-16.

2 . ARHM Mixtures
The ARHM mixture shall be ARHM -GG-D and shall comply with Section 203- 11.3 “Composition and Grading” of the standard specifications with the following exception:

1. A
ir Voids % Calif. Test 367 target and be produced in the range of 2.5 to

5.5. 2. For design and production Hveem stability shall be a 23 min.

3. V
MA for design and production shall be between 18.0% and 23.0%.

The crumb rubber used on the project must be at less 15%, originate and be manufactured in California. Asphalt rubber binder shall utilize both scrap tire and natural rubber and shall comply with the requirements set forth in 203- 6.7 of the SSPWC.

3 . Mix Design
The mix design shall be performed by the asphalt rubber supplier or an approved laboratory, and shall be used as the basis for determining the job- mix formula. The design method used shall be in accordance with Caltrans Hveem mix design methodology. The mixture design shall be submitted to the Engineer at least 10 days prior to construction. Based on information contained in the mixture design, the engineer shall approve a job- mix formula with the following tolerances allowed for single tests on aggregate gradation and asphalt-rubber binder content:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 203

JOB MIX TOLERANCE
Sieve Size Percent Tolerance
3/8" +/- 5
No.4, No.8 +/- 5
No.30, No.40 +/- 5
No. 200 +/- 3
Asphalt-Rubber Binder Content +/- 0.5

The mix design shall include sufficient test results and documentation to assure that all requirements for the aggregate and the asphalt-rubber binder are fulfilled.

The mix must have a minimum of 0.5% anti-strip. No warm mix additives allowed.

4 . Job-Mix Formula
The mix design shall recommend the job- mix formula and shall list the following information:

1. Aggregate
- source and identification (for each material used)
- aggregate quality tests
- gradation (for each material used)
- blend percentage
- mixture gradation

2. Asphalt-Rubber
- source and grade of asphalt cement
- source and type of extender oil or modifier
- source and identification of ground rubber
- ground rubber percentage for the asphalt-rubber binder - type and amount of additive(s), if required
- temperature when added to aggregate

3. Recommended asphalt-rubber binder content by both weight of total mix and weight of dry aggregate.

4. Recommended mixture production temperature.

5. Recommended lay down temperatures.

6. Compacted Unit Weight.

911-03
Proportioning
Subsections 203- 6.5.1 and 203- 6.5.2 shall be modified by adding the following paragraph:

Proportioning shall be performed using an automatic batching system, and the proportioning device shall be automatic to the extent that the only manual operation DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 204

required for proportioning all materials shall be a single operation of a switch or starter.

Subsection 203-6.8 shall be modified as follows:

Asphalt-rubber binder shall be at a temperature not less than 375 ° Fahrenheit when
added to aggregate. The temperature of the aggregate shall not be less than 325° Fahrenheit at the time of adding the asphalt-rubber binder.

911-04 Construction
ARHM shall conform to the specifications for Subsection 302- 5 except as modified herein. Asphalt -rubber hot mix shall consist of one or more courses of an asphalt - rubber binder and graded aggregate as herein specified placed upon a prepared roadbed or base or over existing pavement. The courses shall be of the type of mixture and the dimensions shown on the Plans or Specifications.

The paving shall be performed in such a way as to not leave any longitudinal paving joints at the end of each day’s operation. Transverse paving joints of the surface coarse and leveling coarse shall be at least 1 feet apart.

1 . Tack Coat
Tack coat shall be applied to all existing asphalt concrete or Portland cement concrete surface to be paved over. All vertical edges to be paved against shall be tack coated.

These include, but are not limited to, curb faces, gutter lips, swale edges, cross gutter edges, and asphalt concrete edges.

2 . Cold Joints
All cold joints, both longitudinal and transverse, shall be heated with a torch immediately prior to paving. Care shall be exercised such as to not damage the ARHM by burning or excessive aging, as determined by engineer. Damaged material shall be removed by saw cutting to form a new cold joint followed by torch heating.

Cold joints include previous passes placed more than three hours prior. All cold joints shall be tack coated.

3 . Distributing Spreading
Section 302-5.5 is hereby modified as follows:

At the time of delivery to the work site, the temperature of ARHM shall be between 310
° Fahrenheit and 350 ° Fahrenheit. The ambient air temperature and pavement temperature shall be a minimum of 60ºF at the time of spreading and distribution.

4 . Layout
The CONTRACTOR shall layout and mark the location of the edges of the paving passes of the surface course to match the new layout of the lane lines. The layout shall be made at least 24 hours prior to paving. The layout shall be approved by the Engineer prior to paving.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 205

If the striping is to remain unchanged, the edges of the paving passes shall conform to existing lane edges.

In all cases where practical, each lane shall be paved in a single pass. In tapered transition areas, the shoulder areas shall be paved first, then the through lane shall be hotlapped immediately after the shoulder paving.

For paving which incorporates new quarterpoints or gradebreaks due to keycuts or other conditions, the CONTRACTOR shall provide equipment capable of adjusting to the new surface profile at the appropriate locations. The profile adjustments shall be within twelve inches of the actual quarterpoint or gradebreak.

The CONTRACTOR shall take sufficient measurements during laydown to assure that the full design asphalt concrete layer depth is provided at each quarterpoint, gradebreak, or transition. Failure to provide the design depth at these areas will result in rejection of the work. Correction of this rejected work will include milling out the new asphalt concrete from the road edge to the centerline or nearest inside lane line and repaving. The minimum length of the milled and corrected area shall be fifty feet.

5 . Tolerances
The finished asphalt concrete surface shall be flush with, to 1/4 inch (0.02 feet or 6 mm) above the gutter lips. The finished pavement surface shall not be lower than the gutter lips.

The average pavement thickness shall be equal to the specified thickness for the project. The minimum allowable thickness will be 1/4 inch less than that specified.

The provisions of Section 302- 5.6.2 shall apply and shall be modified to provide that the straightedge shall be 12 foot in length.

6 . Rolling and Compaction
Section 302-9.5 is hereby modified as follows:

A vibratory roller shall be used for initial breakdown rolling. The initial breakdown rolling shall be completed before the asphalt -rubber hot mix temperature falls below 275 
Fahrenheit measured immediately in front of the roller. Pneumatic rollers shall not be used. The CONTRACTOR shall provide sufficient rollers to assure complete compaction before the mixture reaches 160
 Fahrenheit. If the CONTRACTOR at any
time fails to meet this criteria, placement of additional asphalt concrete shall be suspended until compaction is completed on the material previously placed.

Breakdown rolling shall commence when the asphalt concrete is placed. Rolling shall be accomplished with the drive wheel forward and with the advance and return passes in the same line.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 206

On areas where the underlying material appears to be wet or soft or where it deflects under wheel loads, the Contractor shall employ excavation and work techniques which do not worsen the sub-grade condition.

From the second paragraph of Section 302-5.6.2 “Density and Smoothness” to the end shall be deleted and replaced by the following:

Sublots to determine compaction testing shall be based on the following:

• Each 750 tons, or part thereof, placed on an individual street in a paving day. If over 750 tons are placed in a single paving day on an individual street, up to 150 tons over 750 tons can be moved in to the previous 750 ton sublot.

• If multiple streets are paved in a day, each street will be considered its own sublot with multiple sublots on streets where greater than 750 tons are placed.

The in-place density shall be between 92.0 percent and 97.0 percent of maximum theoretical unit weight. Compaction testing will be determined by cores. Three cores will be sampled per sublot. The average of the three cores will be used to determine compaction for the sublot.

Cores will be located by the engineer using random sampling charts in CTM 356.

Cores shall be 4 or 6 inches in diameter and must be sampled within 5 calendar days of paving. The contractor will submit cores, properly labeled, to the engineer for testing.

The engineer will provide core test results within 3 working days of receiving cores.

Contractor shall backfill cores with hot mix AC the same day cores are taken.

Failure to backfill on the same day will subject the Contractor to liquidated damages in the amount of $250 per day per location.

For the percent of maximum theoretical density, the following table shall apply to deductions for average compaction of a sublot:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 207

Reduced Payment Factors for Percent of Maximum Theoretical Density

Mix Type
ARHM
Percent of
Maximum
Theoretical
Density
Reduced
Payment
Factor
Mix Type
ARHM
Percent of
Maximum
Theoretical
Density
Reduced
Payment
Factor

92.0 0.0000 97.0 0.0000

91.9 0.0125 97.1 0.0125

91.8 0.0250 97.2 0.0250

91.7 0.0375 97.3 0.0375

91.6 0.0500 97.4 0.0500

91.5 0.0625 97.5 0.0625

91.4 0.0750 97.6 0.0750

91.3 0.0875 97.7 0.0875

91.2 0.1000 97.8 0.1000

91.1 0.1125 97.9 0.1125

91.0 0.1250 98.0 0.1250

90.9 0.1375 98.1 0.1375

90.8 0.1500 98.2 0.1500

90.7 0.1625 98.3 0.1625

90.6 0.1750 98.4 0.1750

90.5 0.1875 98.5 0.1875

90.4 0.2000 98.6 0.2000

90.3 0.2125 98.7 0.2125

90.2 0.2250 98.8 0.2250

90.1 0.2375 98.9 0.2375

90.0 0.2500 99.0 0.2500
<90.0 Remove &
Replace
Remove &
Replace

The CONTRACTOR shall have hand-compaction equipment immediately available for compacting all areas inaccessible to rollers. Hand- compaction shall be performed concurrently with breakdown rolling. If for any reason hand- compaction falls behind breakdown rolling, further placement of asphalt concrete shall be suspended until hand-compaction is caught up. Hand- compaction includes vibraplates and hand tampers. Hand torches shall be available for rework of areas which have cooled.

After compaction, the surface texture of all hand work areas shall match the surface texture of the machine placed mat. Any course or segregated areas shall be corrected immediately upon discovery. Failure to immediately address these areas shall cause suspension of asphalt concrete placement until the areas are satisfactorily addressed, unless otherwise allowed by the Engineer.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 208

7 . Sampling
The Engineer may sample the asphalt concrete from the truck bed, windrow, hopper for the spreading machine, or the mat at various intervals. The CONTRACTOR shall facilitate the sampling process.

8 . Intersections
Where asphalt concrete overlay work is required on a through street at an intersection without a concrete cross gutter, the overlay on the cross street shall extend to the ECR return where a keycut will be made transverse to the cross street as noted on the Plan or as directed by the City Inspector. Transverse keycuts shall be completed from curb to curb or gutter to gutter as applicable.

9 . Rock Dust Blotter
A rock dust blotter will be required and shall be applied in accordance with Section 302-9.6 at a rate of approximately three pounds per square yard. The cost of this application will be borne by the CONTRACTOR.

10. Temporary Transitions
The CONTRACTOR shall construct temporary pavement transitions at all paving joints greater than 1 inch prior to allowing traffic onto the paved surface. This includes both longitudinal and transverse paving joints for both leveling and surface courses.

Temporary pavement transitions shall have a slope of 20:1 or as approved by the engineer and be constructed on Kraft paper or other suitable bond breaker such that upon removal of the temporary pavement transition, a clean notch remains. The temporary transitions may be constructed of either cold mix or hot mix.

The CONTRACTOR shall continuously maintain the temporar y pavement until final paving. Each temporary transition shall be inspected by the CONTRACTOR and repaired as necessary to comply with these provisions at the end of each day including weekends and holidays.

Failure to comply with these provisions will result in a liquidated damage of $250 per day per transition and/or the cost of City crews making the repairs if necessary, to correct for public safety.

911-05
Measurement and Payments
ARHM (GG-D PG 64 -16) overlay will be measured and paid for at the contract unit price per ton (U.S. standard measure, 2,000 pounds). The unit price paid per ton (U.S. standard measure, 2,000 pounds) includes all costs for saw -cutting, pavement preparation, furnishing and placing materials required, including rock dust blotter, and all labor, equipment, sweeping, tools and incidentals needed to complete the work in place per plans, specifications and details.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 209

No payment will be made for quantities of ARHM which exceed 110% of the calculated quantity required to cover the area shown on the plans in compliance with the approved mix design.

END OF SECTION 911

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 210

SECTION 912 – QUICKLIME AND CEMENT TREATMENT

912-01 General
Work to be performed under this Section covers all labor, materials, tools, equipment and incidentals necessary to cement & quicklime/cement -treat subgrade to a depth specified. All such work shall conform to the Standard Specifications (Greenbook 2015), and these Special Provisions.

912-02
Materials
Where quicklime/cement treatment is specified, the quicklime and/or cement content of the subgrade shall be determined by the Contractor and submitted to the Engineer for approval.

912-03
Definitions
Lot: 3,000 sy of CIR or fraction thereof constructed in the same day.

ERA: Emulsified Recycling Agent
CIR: Cold in Place Recycling using ERA

912-04 Submittals
Submit each FDR – Quicklime/Cement mix design on a form generated specifically for FDR – Quicklime/Cement. Each mix design submittal must be sealed and signed by an engineer who is registered as a civil engineer in California.

You may submit multiple mix designs to optimize the quicklime/cement content and adjust for varying underlying materials in order to provide field adjustment during construction.

Each mix design submittal must include:

1. Area represented by the mix design by beginning and ending stations

2. Gradation of the mixture before addition of cement

3. Cement content in percent by weight of the dry mixture, if supplementary aggregate is specified

4. Moisture content of the material when mixing, relative to OMC

5. Test results and any worksheets, photographs and graphs

912-05
Mix Design
The Contractor shall sample materials on-site and develop a mix design to determine the total percentage of quicklime/cement to obtain a minimum Unconfined Compressive Strength of 300 psi.

The mix design must include 7- day cured unconfined compressive strength tests on specimens with at least 3 Quicklime/Cement contents using the proposed quicklime/cement at optimum moisture content. The quicklime/cement contents must be one percent above the specified content, specified content, and one percent below the specified content by dry weight of the composite material. Manufacture

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 211

3 specimens for each quicklime/cement content and average the results for each. Plot the average 7-day compressive strengths on the ordinate versus the quicklime/cement contents in percent on the abscissa on a graph. Indicate the quicklime/cement contents from the line corresponding to the minimum and maximum 7-day compressive strengths from the specified range.

Notify the Engineer at least 2 business days before sampling the material to develop the mix design(s).

Use materials from the specified mixing depth. If any portion of existing asphalt concrete pavement is to be removed before pulverizing, remove that portion of asphalt concrete pavement from the samples used in the mix design. If additional samples of subgrade material are needed, sampling locations can be excavated outside the edge of pavement to variable dimensions. Characterize and record sampling location features such as layer thicknesses and types, distresses, interlayers, thin or thick areas, digouts and adhesion to the base. Use the sampled material to determine the mix design represented by the sampling location, according to the proportions of the pavement structure shown.

Before opening the mix design sampling locations to traffic, backfill s ampling locations by replacing and compacting with an authorized material or minor HMA that complies with section 39 Hot Mix Asphalt (HMA). Backfill and compact to the existing grade and thickness of asphalt concrete pavement, in the Engineer’s presence

912-06
Construction

1. General Application
The quicklime/cement -treatment application and construction shall be performed in accordance with the Standard Specifications, except as noted. The maximum treatment and lift thickness shall be 18-inches.

The spread rate shall be confirmed on each lift for each row of cement and/or quicklime application until uniformity is confirmed to the Engineer’s satisfaction. Thereafter, the Engineer shall confirm cement and/or quicklime application as needed to confirm uniformity.

Special instructions for construction timing on quicklime/cement s ubgrade treatment streets:

The contractor shall not commence work on quicklime/cement s ubgrade treatment streets until there is a forecasted two-week (14 calendar day) window of dry weather (0% precipitation). However, the contractor may request a shorter window of dry weather any may only proceed with approval by the Engineer. The contractor must complete all paving work within the two- week window. Paving work consists of pulverizing existing pavement, base, and native se ctions, removal of the existing pavement section, quicklime/cement treatment of the underlying subgrade, and placement of the AC base course and ARHM surface DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 212

course as shown on the plans. The schedule for this work will be reviewed and approved by the City prior to the commencement of work.

2 . Quality Control
Assign a ground supervisor whose sole purpose is to monitor the activities, advise project personnel and interface with the quality control testing personnel. The ground supervisor must not have any sampling or testing duties. During the FDR operation, the ground supervisor must have knowledge and a minimum of two years experience with the FDR construction. The ground supervisor must be familiar with the mix design(s) for this project and will be able to make field adjustment during the construction on an as needed basis to account for varying structural section and materials. The Engineer or Engineer’s Representative (QA) must be notified prior to field adjustments. All field adjustment must be recorded, but is not limited to the following items: date, time, location (with ending and starting stations), the type of field adjustment, and reasons for the field adjustment must be recorded and submitted to the Engineer.

Test the quality characteristics for the following:

FDR – Quicklime/Cement Quality Char acteristic Sampling Locations and Testing Frequencies

Quality
Characteristics Test Method
Minimum Sampling
and Testing
Frequency
Sampling Location
Gradation CT 202 Test Strip and 1 per
Lot
Loose Mix Behind
Mixer
Unconfined
Compressive
Strength
ASTM D 1633 Test Strip and 1 per
Lot
Loose Mix Behind
Mixer a
Laboratory
Maximum Wet
Density
CT 216
Test Strip and 1 per
Day or 1 per Street
or 1 per Changes to
the Material
(whichever is more)
Loose Mix Behind
Mixer
Relative
Compaction CT 231 10 Points per Test
Strip and Lot b Compacted Mix
a Sample immediately after mixing is complete
b Lot size is defined as 3,000 squared yards.

The first day of the FDR construction could be accepted as the test strip.

Measure and record the actual cut depth at both ends of the pulverizing drum at least once every 300 feet along the cut length. Take measurements in the Engineer's presence.

3 . Compaction
Compact in 12-inch maximum lifts to 95 percent relative compaction per CT 231.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 213

The maximum compacted thickness of a single layer may be increased provided the Contractor can demonstrate to the Engineer that the equipment and method of operation will provide uniform distribution of the quicklime/cement and the required compaction density throughout the layer.

4 . Tolerances
Completed quicklime/cement subgrade treated section after compaction and trimming shall be equal to the design thickness. The minimum thickness shall be the design thickness minus 1 inch.

Thickness/Uniformity Verification - Immediately after trimming and compaction are completed, excavate test pits. At locations selected by Engineer, excavate a test pit for each 3,000 square yard of treated area. Test pits shall be 1 ft. by 1 ft. minimum, to verify the thickness of the Quicklime/Cement -treated section. Backfill with Quicklime/Cement-treated material and compact immediately after verification.

5 . Curing
If not covered by asphalt concrete or aggregate base within 48 hours, the exposed stabilized soil subgrade shall be covered with SS -1h within 24 hours of completing quicklime/cement stabilization. The emulsion seal can be waived if the contractor can provide a method to keep the FDR layer moist to provide adequate quicklime/cement hydration and dust control up to the time the FDR area is paved.

6. P
rotection
Contractors shall maintain the subgrade in a smooth, compacted condition until placement of aggregate or hot mix asphalt. Any damage to the treated subgrade shall be repaired by immediately replacing with AC material within 24 hours after damage.

After compaction of the FDR layer, only rubber-tired vehicles or paving equipment shall be permitted on the treated surface.

7. E
ngineer’s Acceptance
For the unconfined compressive strength, the following table shall apply to deductions for average unconfined compressive strength of a lot:

Average Unconfined Compressive
Strength per Lot [psi] Reduced Payment Factor
> 299 a 0.00
250 – 299 0.05
200 – 249 0.15
< 200 Remove and Replace
a No individual unconfined compressive strength shall be below 200 psi.

912-0 7 Measurement and Payment
The contract price paid per square foot for “ Quicklime & Cement Treat 10” Subgrade”, and “ Quicklime & Cement Treat 15” S ubgrade” shall include full compensation for

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 214

furnishing all labor, materials, tools, equipment, and incidentals, mix design preparation, providing quality control, and for doing all the work involved in Quicklime & Cement S ubgrade Treatment, complete in place, including breaking- up, mixing, spreading, compacting, trimming, curing, and protecting treated soil, as shown on the plans, as specified in the Standard Specifications and in these special provisions, and as directed by the Engineer.

The contract price paid per square foot for “Pulverize 12” Existing Section and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in pulverization and grading , recompacting, complete in place, as shown on the plans, as specified in the Standard Specifications and in these special provisions, and as directed by the Engineer.

“Quicklime/Cement Treat 12" for Quicklime & Cement Treat shall be paid for by the ton.

The quantity of lime and cement is subject to increased or decreased quantity and will be the difference between the specified theoretical quantity of lime and cement and the quantity of lime and cement used.

END OF SECTION 912

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 215

SECTION 913 – LOWERING & ADJUSTING OF UTILITY COVERS

913-01 Scope
Utility locations are not indicated on the plans beyond the location of utility lids within the existing roadway. It shall be the responsibility of the Contractor to work with the local utility companies and to locate all underground utility service lines within the limits of all excavations. All necessary work to relocate, adjust or rearrange utilities shall be performed by the respective utility company prior to excavation by the Contractor. The Contractor shall schedule potholing and location of underground utility conflicts sufficiently in advance of the construction to permit the Engineer to make adjustments to the plans or to allow the various utility companies to adjust the conflicting utility lines, as appropriate.

The Contractor shall take reasonable care to protect existing underground utility service lines including curb drains from damage. Any damage caused by the Contractor's lack of reasonable care shall be repaired at the Contractor's expense.

Contractor shall use extreme caution when working near street lighting or traffic signal conduit.

The Contractor shall be responsible for all direct and indirect costs associated with any delays or damage to work in progress, which is caused by ruptured or damaged utilities.

All utility boxes, vaults, and manholes, which will be covered or obscured by the construction, shall be referenced for future location by the Contractor. References shall be tied to two fixed objects, which also indicate the location and distance to the vault or cover.

913-02
Construction
Prior to cold planing on streets to have a uniform depth of the existing surface removed, all utility covers shall be lowered by the Contractor such that the cutting teeth of the planing machine passes over the adjusted lid without causing damage to the lid or frame. Contractor shall be responsible for maintaining any temporary asphalt fill material over these facilities until the final paving surface is installed. The Contractor shall clearly mark or reference lowered sanitary sewer and water valves in case emergency access is required by the agency responsible for operation of the sewer and water system.

Raising Manholes:

Manholes shall be adjusted to finish grade by the Contractor within 72 hours after the placement of the final surface paving on each individual street segment. If several lifts of pavement are to be placed, the manholes shall be raised by the utility company if the paving operation ceases for more than 72 hours as approved by the engineer.

Dirt, rocks or debris shall not be permitted to enter manholes or storm drain lines.

When raising manhole adjustment by the Contractor involves excavation or concrete DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 216

removal, a temporary cover shall be placed to prevent entry of material into the manhole, storm drain pipes.

913 -03 Measurement and Payment
The contract unit price paid for “Lower Manhole Cover s”, “Lower Water Valve Covers”, “Lower Sewer Cleanout Covers”, “Lower Survey Monument”, “Lower Gas Covers”, “Adjust Manhole Cover to Finish Grade ”, “ Adjust Water Valve Cover to Finish Grade”, “Adjust Sewer Cleanout Cover to Finish Grade”, “Adjust Gas Cover to Finish Grade”, “Adjust Survey Monument to Finish Grade”, “Lower and Adjust Loop Detector Covers” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in lowering and raising utility frames and covers to grade, complete in place, including coordination with the utility companies, the Engineer, and City Surveyors, replacing disturbed monuments, salvaging existing or furnishing new utility frames and c overs, concrete, mortar, and AC (type A), as shown on the plans, as specified in the Standard Specifications and these special provision, and as directed by the Engineer.

END OF SECTION 913

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 217

SECTION 914 – TRAFFIC STRIPING, MARKINGS & SIGNS

914-01 T raffic Striping, Markings, & Signs
This work shall consist of installing/replacing all traffic stripes, legends, crosswalks, and limit lines and providing new STOP legends and bars in accordance with the current State of California Standard Plans (SSP). All traffic striping shall be paint.

All striping shall be installed based on the latest standard specifications. This work also includes painting and/or re- painting existing painted curb and curb markings with the same kind and color of paint, and as shown on the Plans and as directed by t he Engineer.

914-02
M aterials
Paint
Painting of pavement markings and striping shall be in accordance with Section 84 "Markings” of the State Standard Specifications, except that all traffic markings and striping constructed with Rapid Dry Paint shall be made in two (2) applications, three (3) days minimum between each application, each at the specified application rate.

The first application shall be applied within five calendar days after completion of paving.

Pavement Markers
Pavement markers shall meet the requirements of Section 82 “Signs and Markers” of the Standard State Specifications and shall be completed no later than seven calendar days after completion of paving.

Traffic Signs
Traffic signs shall be constructed in accordance with Subsection 82 “Signs and Markers” of the State of California Standard Specifications (SSS), the CAMUTCD and these special provisions. Roadside signs shall be furnished and installed at the locations shown on the plans or where directed by the Engineer. Sign panels shall be furnished by the Contractor, and shall conform to the State of California Traffic Sign Specifications. Traffic signs shall meet the minimum size requirements as indicated in the CAMUT CD and shall have High Intensity Prismatic Reflective Sheeting as manufactured by 3M Company, or approved equal. All stop (R1- 1) and yield (R1- 2) signs shall have VIP (Diamond grade or Type 9) sheeting as manufactured by 3M or approved equal. In addition, all signs that have a fluorescent yellow or fluorescent yellow/green (school zone, pedestrian and bikeway signs) background shall have VIP sheeting.

914-03
C onstruction
The Contractor shall be responsible for compiling an existing striping and marking plan including but not limited to stop bars, legends, parking stall stripes, crosswalks and other traffic delineation markings within the project prior to removing, obliterating, covering any existing striping, or starting work on the affected street. This plan must be DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 218

submitted to the Engineer and approved prior to commencing any striping and marking operations on the affected street.

All alignments and layout measurements, and other work necessary to locate and replace traffic stripes and pavement markings shall be performed by the Contractor.

The City will not provide any assistance, information, or materials to the Contractor. It will be entirely the responsibility of the Contractor to perform all necessary pre- construction and construction layout work, obtain all necessary measurements and information, and prepare all plans for performing the striping and marking work as specified. All traffic control systems necessary for performing striping and marking, as directed by the Engineer, shall be the responsibility of the Contractor.

The Contractor shall physically tie down the location of the beginning and ending of each paint marking type in the adjacent curb top. The marking location shall not exceed 50 square inches each. Any locations exceeding this limit shall be removed by the Contractor prior to acceptance of the work. The Contractor shall contact the Engineer for review of tie downs.

The Contractor shall be responsible for accurately referencing out and replacing the lines and positions of all traffic lines, directional lines, arrows, and other markings in accordance with the plans and City standard markings by cat tracking with painted marks. This shall occur no later than 2 hours behind the final surface course paving operation.

Cat tracking shall consist of stretching a rope on a straight line between control points on tangent alignment and on a true arc through control points on curved alignment and placing spots of paint along the rope. Temporary tab markers shall be placed not more than 12’ apart on curves nor more than 24’ apart on straight segments.

Temporary tab markers shall be the same color as the traffic stripe that they are replacing, shall measure 2” tall by 3- 1/2” wide, and have a reflective lens across the width of the marker.

Prior to application of permanent striping and markers, the Contractor shall call for review and approval of the proposed striping by the City’s Traffic Engineer or agent.

The City shall have the right to make changes in the location and alignment of line stripes. Striping and traffic markings shall not be applied until after approval is granted by the Traffic Engineer. The Contractor shall allow a minimum of 3 working days for review of the layout by the City.

It shall be the responsibility of the Contractor to "touch up" any striping, stop bars, legends or line striping that may wear out in- between coats of paint due to raveling or premature wear to ensure public safety at no cost to the City. Contractor shall execute “Touch Up” painting at the engineer’s request.

Paint for street traffic striping and pavement markings shall be a minimum of 3 applications. Pavement markings and striping shall consist of the following:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 219

a. The first application of paint shall consist of two (2) complete coats and shall be completed prior to the opening of each street.
b. The second application of paint shall consist of three (3) complete coats and shall be completed between the fifth (5th) and tenth (10th) day following each street segment having the surface course placed.
c. The third and final application of paint shall consist of three (3) complete coats of paint and shall be applied in the presence of the inspector and shall be subject to the Engineer's approval, the third and final coat shall be completed within not less than three (3) and not more than four (4) weeks of each str eet having the surface course placed.or the end of the Construction Period, whichever is sooner.

Raised pavement markers (RPM’s) shall be placed as specified in Subsection 85-1.06, “Placement”, of the Standard Specifications. When utilizing hot melt bitum inous adhesive, RPM’s shall be placed after the surface has been open to traffic for at least 7 days. When utilizing epoxy adhesive, RPM’s shall be placed after the surface has been open to traffic for at least 14 days. Regardless of which adhesive is util ized, the RPM’s shall not be placed more than 21 days after paving or surfacing.

Permanent traffic striping and markings including legends and arrows shall be placed within 21 days after paving or surfacing, unless otherwise directed by the Engineer.

Temporary yellow marking tape denoting school crosswalks shall be placed the same day that the pavement surfacing is placed.

Traffic signs shall be installed on a 1.75”x1.75” square perforated steel pole (painted green) or approved equal and inserted into a 2"x2"x36” anchor sleeve.

914-04
M easurement and Payment
Payment for traffic striping layout and placement of temporary tabs, removal of existing RPMs and grinding paint will be included in the unit price bid for each striping detail and no additional compensation will be allowed therefore.

Measurement and payment for traffic striping, characters, arrows, pavement markers, raised pavement markers, reflective pavement markers, road signs and delineators shall be paid on a unit cost basis as identified in the Bid Schedule.

Full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the work involved with removing existing and placing painted pavement stripes and markings, including pavement markers, and temporary markings as specified in these Special Provisions, as shown on the plans and as directed by the Engineer, shall be considered as included in the Contract Unit Price for the various kinds of Traffic Striping, Markings & Signs identified in the Bid Schedule, no additional compensation will be allowed.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 220

END OF SECTION 914

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 221

SECTION 916 – MISCELLANEOUS CONCRETE

916-01 G eneral
This section pertains to existing and new concrete facilities including curbs, curbs and gutters, cross gutters, spandrels, sidewalks, access ramps, alleyway entrances, commercial and private driveways, and swales shall be removed and replaced or constructed at the locations indicated on the plans or as directed by the Engineer.

Curb ramps shall be per Standard Specifications for Public Works Construction, 2018 Edition, and Standard Plans for Public Works Construction, 2012 Edition.

Any other work required to construct curbs and gutters, sidewalks, curb ramps, and/or driveways including, but not limited to, demolition, sawcutting, concrete removal, traffic control, aggregate base, aggregate base and/or compaction, and associated asphalt concrete pavement shall be considered incidental to the work and no additional compensation will be allowed.

916-02 M at
erials

1. Concrete Curb Ramps
Sawcut and remove existing concrete curb ramps to n earest existing joint and dispose of at recycle facility.

Compact subgrade to minimum 90% relative compaction.

Aggregate base under curb ramps shall meet the requirements of “Section 909 Aggregate Base” of these Special Provisions . Place and compact minimum 6 ” aggregate base to minimum of 95% relative compaction under limits of the curb ramps.

Concrete curb ramps shall be construct ed of Class 520-C-2500 concrete (4” max slump?).

Concrete Mix Design
The Contractor shall furnish a concrete mix design to the Engineer at least ten working days prior to the start of the work, based on the following guidelines:

General Concrete Facilities including curb, gutter, sidewalk, access ramps, residential driveways, etc. shall meet the following requirements:

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 222

Compressive Strength: 2500 psi @ 28 days
Polypropylene Fiber Reinforcement: 1.5 lbs/cy (0.01% by volume), 3/4-inch minimum length
Maximum Slump: 5 inches

Heavy Vehicular Facilities including cross gutters, spandrels, swales, commercial driveways, and alley entrances shall meet the following requirements:

Compressive Strength: 2000 psi @ 3 days,
4000 psi @ 28 days
Polypropylene Fiber Reinforcement: 3.0 lbs/cy (0.02% by volume), 1- 1/2-inch minimum length
Maximum Slump: 4 inches

The Contractor shall be responsible for all costs associated with the required mix design.

2 . Truncated Domes (Cast-in-Place)
All curb ramps shall have detectable warning surface. The detectable warning surface and truncated domes shall conform to the requirements of these specifications and the details provided in the Standard Plans. The cost for placement of detectable warning surface shall be included in the unit price for curb ramp and no additional compensation will be made.

The detectable warning surface shall be prefabricated modules designed to be inserted in wet concrete. The color of the detectable warning surface shall be yellow per Caltrans Standards. The finished surfaces of the detectable warning surface shall be free from blemishes.

The manufacturer shall provide a written 5-year warranty for prefabricated detectable warning surface, guaranteeing replacement when there is defect in the dome shape, color fastness, sound-on-cane acoustic quality, resilience, or attachment.

Concrete curb ramps shall be constructed in accordance with the County of Santa Barbara Standard Plans and the Standard Plans for Public Works Construction . A copy of these Standard Plans are attached in the Appendix.

3 . Quality Assurance Field Testing
Field testing shall include testing for concrete slump as per ASTM C -143 and compressive strength (C39). Such testing shall be at a frequency determined by the Engineer and shall be performed by the Owner’s laboratory at the Owner’s expense.

The Contractor shall furnish the concrete necessary for casting test cylinders.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 223

916-03 C ons truction
All work shall conform to the provisions of Section 303 of the Standard Specifications.

All curb ramps and island passageways shall comply with the latest Standard Plans for Public Works Construction, 2018 Edition; and current CBC requirements.

All curb ramps shall meet current American with Disabilities Act (ADA) guidelines. The curb ramp limits will be from beginning of curb return to end of curb return. The ramp shall include the construction of the curb and gutter from beginning of curb retur n to end of curb return. The normal gutter line shall be maintained through the area of the curb ramp. Curb ramps shall not be less than forty -eight inches (48”) wide and shall not have a slope greater than one inch (1”) per twelve inches (12”) in length. Curb ramps should be located within marked limits of crosswalks.

The existing concrete shall be sawcut full depth prior to removal. Any concrete broken due to the Contractor’s failure to comply with these requirements shall be removed and replaced at the Contractor’s expense.

The line and grade of the replaced facilities shall conform to the existing facilities. In most instances, this will consist of a straight line between existing facilities.

The Contractor shall water test all repaired curbs and gutters, cross gutters, and other repaired drainage facilities in the presence of the City’s Inspector.

Commercial driveway and alley approaches, including the adjacent curb and gutter section, shall be removed and replaced within twenty-four hours. Curing time shall be seventy-two hours.

Contractor to saw and remove all concrete groove and replace with concrete and cast- in-place truncated domes.

1 . Protection of Existing Facilities
The CONTRACTOR shall protect existing facilities from damage, and discoloration from concrete splash. Adjacent concrete facilities shall be covered during concrete placement to prevent concrete splash and excess concrete from staining the adjacent concrete. After initial placement, strikeoff and finishing, the protection shall be removed, and the adjacent concrete cleaned.

Vertical existing facilities such as light poles, walls, etc. shall be protected with plastic extending a minimum of three feet above the concrete surface. After initial placement, strikeoff and finishing, the protection shall be removed, and the vertical surfaces cleaned.

2 . Subgrade
After the subgrade is prepared, moisture conditioned, and compacted to 90% relative compaction at zero to three percent over optimum, the Contractor shall continuously maintain the sub- grade in a uniform condition at the moisture DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 224

content obtained during sub-grade compaction until the concrete is placed.

3 . Forming
Wooden forming shall be of t wo-inch nominal thickness staked at two- foot intervals.

The maximum gap at the bottom of the forms shall be 1-3/4 inches.

4 . Tolerances
The maximum variation from design elevation shall not exceed +/- 0.02 feet. In some instances, particularly in critical drainage areas, tolerances may be reduced to zero.

Concrete facilities shall be installed to maintain or provide positive drainage. Questions regarding applicable tolerances shall be directed to the Engineer forty -eight hours in advance of the work.

When shown on the drawings, the concrete shall be set at the design elevations. When existing facilities are to be removed and replaced, they shall conform to the existing elevations and grades. Generally, this will be at a straight line between the start and end points of the removal.

5 . Placing and Finishing
The concrete shall be deposited on a moist grade in such a manner as to require as little re-handling as possible. Workmen shall not be allowed to walk in the freshly mixed concrete with boots or shoes coated with earth or foreign substances.

6 . Strikeoff, Consolidation, and Finishing
In general, adding water to the surface of the concrete to assist in finishing operations shall not be permitted.

Before final finishing is completed and before the concrete has taken its initial set, the edges shall be carefully finished with the radius shown on the plans or a radius to match the existing construction.

Concrete shall be thoroughly consolidated against and along the faces of all forms and adjacent concrete. After the forms are removed, excess concrete below the form surface shall be removed to be flush with the form face.

All new concrete shall match existing facilities in texture, color, and appearance.

7 . Concrete Protection
The Contractor shall always have materials available to protect the surface of the fresh concrete against rain. These materials shall consist of burlap, curing paper, or plastic sheeting. If plastic sheeting is used, it shall not be allowed to contact finished concrete surfaces.

The Contractor shall also protect the concrete against traffic and vandalism. If the concrete is damaged or vandalized, the Contractor shall make the necessary repairs

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 225

at its own expense. The repair procedure for damaged or vandalized concrete shall be approved in advance by the Engineer.

8. C uring
Concrete shall be cured by protecting it against loss of moisture, rapid temperature change, and mechanical injury for at least three days after placement. Whit e or clear liquid membrane compound shall be used. After finishing operations have been completed, the entire surface of the newly placed concrete shall be covered by the curing medium. The edges of the concrete exposed by the removal of forms shall be protected immediately to provide these surfaces with continuous curing treatment.

The concrete shall be allowed to cure for seventy -two hours prior to placing adjacent asphalt concrete.

9. J
oints
Control joints shall be placed at a maximum spacing of ten fee t. Control joints in all PCC facilities, except sidewalks, shall be formed by tooling a deep joint or by using expansion joint material. If expansion joint material is used, a minimum of two 1/2 inch by eighteen-inch dowels shall be used with additional dowels placed every twenty-four inches.

Control joints in sidewalks may be made using a tooled joint which shall extend a minimum of 1/4 of the depth of the concrete and shall not be less than 1- 1/2 inches in depth.

Expansion joints shall be required at a maximum of forty-foot intervals on curbs, curbs and gutters, cross gutters, swales, and sidewalks. Expansion joints shall also be required on all corners of curbs, curbs and gutters, sidewalks, at the outside boundary of access ramps, and other locations with discontinuities or reentrant corners which may cause cracking.

10. Cleanup and Backfill
After the concrete is placed, cured, and the forms have been removed, the Contractor shall clean the site of all concrete and forming debris. The aggregate base shall be replaced to match the existing base and compacted to 95% relative compaction. The pavement shall be restored in accordance with Section F2- 6 Digouts or Remove & Replace and Cold Plane & Replace, of these Special Provisions. A minimum of two lifts shall be used, none of which shall exceed three inches, and the top lift shall be a minimum of 1- 1/2 inches thick. The total thickness of the restored pavement shall match that of the existing pavement.

For pavements to be overlayed or resurfaced, the aggregate base and asphalt concrete may be replaced with cement sand slurry in conformance to Section 201 of the Standard Specifications, or Controlled Low Strength Material (CLSM). After curing has been completed and the forms have been removed from the new curb and gutter or sidewalk, the void between the new concrete and the existing parkway shall be filled with clean native material and the entire parkway left in a clean and orderly condition.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 226

For concrete removed but not replaced, the resulting void after excavation shall be backfilled with clean native material unless noted.

916-04 M easu rement and Payment
Measurement and payment for miscellaneous concrete shall be paid on a unit cost basis as identified in the Bid Schedule . These include “ Remove & Replace Sidewalk”, “Remove & Replace Curb & Gutter ”, and “ Remove & Replace PCC Spandrel”, as shown on plans , as specified in the Standard Plans for Public Works Construction, and Standard Specifications.

Payment for “Construct Caltrans Type A Ramp ”, “Construct Caltrans Type B Ramp”, “Construct Caltrans Type C Ramp”, “Construct Caltrans Type CM Ramp”, “Construct Caltrans Type F Ramp”, “Construct Caltrans Median Island Type C ” shall be at the contract unit price per each listed in the bid schedule. This work shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all work involved in constructing curb ramps, including but not limited to subgrade preparation, supplying and placement of 6” thick aggregate base, asphalt concrete removal and curb ramp construction work, portland cement concrete removal and replacement including curb, gutter, and sidewalk , detectable warning surface and truncated domes, retaining curbs, dowels, reinforcement materials, relocating and resetting signs, associated traffic control, and coordination with utility agencies, and all work as may be required by the Contract Documents, as specified herein, and as directed by the Engineer. The cost to construct curb ramps shall include associated curb and gutters and adjacent sidewalk and driveway areas reconstructed to match grade with, or damaged by reconstruction of, new access ramps. Asphalt Concrete replaced in front of access ramps, shall be considered as included in the contract unit price paid per each access ramp and no additional compensation will be allowed.

The above contract unit costs shall be considered full compensation for furnishing all labor, mat erials, tool, equipment, incidentals and for doing all the work involved in performing complete in place, including sawcutting, base and native material removal, excavation and hauling, grading, and disposing of excess material, as shown on the plans, as specified in the Standard Specifications and as directed by the Engineer. The cost of restoring the adjacent pavement shall be included in the unit cost of the work.

No additional compensation will be allowed therefor.

END OF SECTION 916
DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 227

SECTION 917 – TRAFFIC LOOPS

917-01 Scope
Work to be performed under this Section covers all labor, materials, tools, equipment, transportation, and incidentals necessary to replace existing loop detectors at various street intersections. It is anticipated that all the existing loop detectors at t he intersections will be damaged by the proposed pavement cold planing and removal of surfacing and base. Loop detectors at cross streets may also be affected and shall be replaced to reestablish a functioning traffic signal system.

917-0
2 Materials
Unless otherwise allowed by the Engineer, all replaced signal loops shall be 6 foot diameter circular loops (Type E). Loop wire shall be Type I.

All such work shall conform to the details and provisions of the State of California, Department of Transportation's Standard Plans and Section 307, "Street Lighting and Traffic Signals," of the Standard Specifications, 2012 Edition, and these Special Provisions, except that Subsection 307-5.4, "Payment," is modified herein.

917-03
C onstruction
The proposed locations of the replaced signal loops detectors shall be marked in the field and approved by the Engineer prior to installation.

Maintaining the traffic signals during construction shall be a part of this work.

Temporary Traffic Loops shall be installed at locations shown on the plans prior to cold planing. Contractor shall not disconnect loop detectors in operation until replacement with Temporary Traffic Loops. Failure to install temporary loops or follow this schedule will result in liquidated damages of $2,000 per loop detector. Failure will cause the work to be performed by City forces and the Contractor back charged for the work.

Prior to initiating any work on the street which contains the signal loop detectors, the CONTRACTOR shall prepare drawings of all signal loops in the affected work area.

The drawing shall show the size and location of the existing loops, routing of wiring, and proposed replacement location.

Where the sump of an existing pull box is disturbed by the CONTRACTOR's operations, the sump shall be reconstructed and, if the sump was grouted, the old grout shall be removed and new grout placed.

The CONTRACTOR shall test the detectors with a motor -driven cycle, as defined in the California Vehicles Code that is licensed for street use by the Department of Motor Vehicles of the State of California. The unladen weight of the vehicle shall not exceed 220 pounds and the engine displacement shall not exceed 100 cubic centimeters.

Special features, components or vehicles designed to activate the detector will not be permitted. The CONTRACTOR shall provide an operator who shall drive the motor -

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 228

driven cycle through the response or detection area of the detector at not less than 3 miles per hour nor more than 7 miles per hour.

Traffic loops will be disconnected or connected by the CONTRACTOR. The CONTRACTOR shall notify the Engineer 24 hours prior to any detect or being disconnected or connected. Timing adjustments shall be made by City traffic personnel.

917-04
M easurement and Payment
Traffic loops shall be measured and paid for at the contract unit price per each loop detector replaced.

The unit price paid per each “Remove and Install Temporary Traffic Loops” shall include all costs associated with underground conduit, wiring, pull boxes and vaults, signal loops, connections, elastomeric sealer, testing, etc. required to remove and install the replacement loop in accordance with Caltrans standards. Traffic loops shall be round.

The unit price paid per each “Remove and Install Permanent Traffic Loops” shall include all costs associated with underground conduit, wiring, pull boxes and vault s, signal loops, connections, elastomeric sealer, testing, etc. required to remove and install the replacement loop in accordance with Caltrans standards. Traffic loops shall be round.

END OF SECTION 917

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 229

SECTION 918 DIGOUTS OR REMOVE & REPLACE AND COLD PLANE & REPLACE

918-01 G eneral
The work of Digouts or Remove & Replace consists of removing the existing asphalt concrete and base if necessary to the specified depth by cold planing and replacing the void with asphalt concrete. Digouts shall be constructed as indicated on the plans and immediately after cold planing operations so that the asphalt concrete levelling (base course) can be placed on the milled surface in the same shift.

918-02
M aterials
Asphalt concrete for Digouts or Remove & Replace shall be C2 and conform to Section 910.

Asphalt concrete binder shall be C2 PG 64-10 (dense medium coarse) per Table 203-6.4.4 unless specified on the plans or approved by the engineer.

918-03 C onstruction
The Engineer shall mark the locations of each digout based on the plans and observations after th e full -width milling operations have been completed. The CONTRACTOR shall accompany the Engineer during markings of the digouts/base repair areas and the marked, measured and agreed on areas will constitute the final pay quantity.

After completion of the full-width milling operations, the asphalt concrete within the marked digout/base repair areas shall be removed to a uniform depth as specified. The edges of the removal area shall be saw cut or vertical grind. Any removed material shall be removed from the site.

If base rock is exposed, the surface shall be compacted and proof-rolled in the presence of the Engineer or designated representative. The pavement area shall be cleaned and tack coated in accordance with Section 907. Asphalt concrete shall be placed and compacted as specified in Subsection 302-5 of the Standard Specifications. Tack coat shall be placed after each lift of asphalt concrete.

At areas where the underlying material appears to be wet or soft, or where it deflects under wheel loads, the CONTRACTOR shall employ excavation and grading techniques which do not worsen the subgrade condition.

Prior to placing asphalt concrete, the area shall be proof -rolled with a loaded construction vehicle, preferably a ten cubic yard dump truck or equivalent. The compacted surface shall not visibly yield or deflect. Soft, yielding, unstable, or unsuitable areas shall be removed and replaced with base rock or asphalt concrete. If the areas were caused or significantly worsened by the CONTRACTOR’s operations, these areas shall be replaced at the CONTRACTOR’s expense.

In the event that the underlying material is soft, yielding, unstable, or unsuitable, it shall be excavated to the depth of 6 inches below the initial digout/base repair depth required above and disposed of in accordance with these Special Provisions. The limits of removal shall be

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 230

designated by the Engineer. The resulting space shall be filled with a single lift of asphalt concrete and compacted according to Section 302- 5.6.2 of the Standard Specifications.

Payment for removing unsuitable subgrade and replacing with asphalt concrete pavement will be made under the Bid Item “6” Deep Lift Stabilization (Allowance)” . “6” Deep Lift Stabilization (Allowance)” shall be considered an allowance as it is not known if unsuitable subgrade requiring over-excavation will be encountered during construction.

Unsuitable material is defined as material the Engineer determines to be:

1. Of such unstable nature as to be incapable of being compacted to specified density using ordinary methods at optimum moisture content, or

2. Too wet to be properly compacted and circumstances prevent in-place drying prior to incorporation into the work, or

3. Otherwise unsuitable for the planned use.

Remove only what can be replaced during the same work period. For streets that call for an ARHM surface course the CONTRACTOR shall coordinate the schedule and timing of placing the ARHM. The AC base course and any intermediate AC courses shall be placed during the same work period.

918-04
Measurement and P ayment
Payment for “Remove and Replace 4” AC”, “Remove and Replace 5” AC”, “Remove and Replace 8” AC”, “Remove and Replace 9” AC”, “Prune & Remove Tree Roots” complete in place, will be made at the contract unit price bid per square foot for the respective items. Such payment shall be considered full compensation for furnishing all labor, material, asphalt concrete, tack coat, tools, and equipment necessary to complete the work including the removal and proper disposal of the excavated material, in accordance with the Standard Specifications and these Special Provisions.

Sawcut shall be incidental to the work.

Section 3-2.2.2 “Increases of More Than 25 Percent” and Section 3- 2.2.3 “Decreases of More Than 25 Percent” shall not apply to the bid items related to removing and replacing pavement or digouts.

Measurement and Payment for “6” Deep Lift Stabilization (Allowance)” shall be paid per square foot, as indicated in the bid schedule. The unit costs shall include full compensation for sawcut, removal of unsuitable subgrade and placement and compaction of six (6”) inches of asphalt concrete (AC). Payment for this item shall only be made on an allowance basis and only for the work completed. The Contract shall have no claim to that portion of the allowance which is not necessary for the project.

END OF SECTION 918

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 231

SECTION 919 CRACK SEAL

919-0 1 General
This work shall consist of mechanically routing cracks, cleaning, applying sterilent, and filling the cracks with rubber asphalt joint seal as specified in these special provisions, and as directed by the Engineer. All cracks 1/8 of an inch wide or wider shall be sealed.

919-0
2 Materials
The crack sealant shall be a mixture of paving asphalt and ground rubber and shall conform to ASTM D 5078, Type II. The crack seal product shall conform to the following requirements:

Test Specification Limit
Cone Penetration 77°F(25°C)(ASTM D5329) 35-55
Resilience (ASTM D5329) 40% min.

Softening Point (ASTM D36) 200°F(93°C) min.

Ductility 77°F(25°C)(ASTM D5113) 30 cm min.

Flexibility (ASTM D3111 Modified) Pass at 20°F(-7°C)
Flow 140°F(60°C)(ASTM D5329) 3 mm max.

Brookfield Viscosity 400°F(204°C)(ASTM D2669) 100 Poise max.

Asphalt Compatibility (ASTM D5329) Pass
Bitumen Content (ASTM D4) 60% min.

Tensile Adhesion (ASTM D5329) 500% min.

Safe Heating Temperature 400°F(204°C)
Recommended Pour Temperature 380°F(193°C)

919-0 3 Construction
During all construction operations, the CONTRACTOR shall protect cracks cleaned for sealing from intrusions of solid foreign materials into the groove or into the sealant.

Immediately prior to applying the sealant, the cracks shall be mechanically routed and then cleaned with high pressure air jets to remove all residue and foreign material. Cracks wider than 1/4 inch do not need to be routed prior to crack sealing . Any weed growth shall be physically removed. Any areas indicating weed growth shall be treated with a soil sterilent.

Water jets will not be allowed. Crack surfaces shall be surface dry at the time the sealant is applied. The CONTRACTOR shall submit a product information sheet on the sterilent to be used.

Crack seal materials shall be placed in conformance with the manufacturer's recommendations. Crack seal materials shall not be placed when the surface temperature is below 50 degrees Fahrenheit.

The finished crack seal shall be bonded to the crack such that there is no separation or opening between the sealant and the crack edge and there shall be no cracks, separation or other opening in the sealant.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 232

The CONTRACTOR shall remove crack seal material that is not placed within the conformance of these provisions, clean cracks as specified herein and then reseal the cracks at his expense.
919-0 4 Measurement and Payment
The measurement and payment for crack sealing shall be included in the contract unit price for Slurry Seal.

END OF SECTION 919

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 233

SECTION 920 SLURRY SEAL

920-0 1 General
The work consists of constructing a Type II slurry seal. The Type II emulsion- aggregate slurry seal constructed in accordance with Section 203-5 and 302-4 and as modified herein.

920-0
2 Materials
The materials for slurry seal immediately prior to mixing shall conform to the following requirements:

Aggregate – Aggregate shall conform to Type II. Aggregate shall be 100% crushed with no rounded particles.

Asphalt Emulsion - Polymer modified asphaltic emulsion shall be composed of a bituminous material uniformly emulsified with water and an emulsifying or stabilization agent and shall contain a polymer. The polymer used in the manufacture of polymer modified asphaltic emulsions shall be at the option of the CONTRACTOR, either neoprene, or a copolymer of butadiene and styrene. The polymer used in the polymer modified asphaltic emulsion shall be homogenous and shall be milled into the product at the colloid mill.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 234

The polymer modified asphalt emulsion
shall be grade PMCQS1h and shall
conform to the following
requirements:Type
Cationic
Grade PMCQS1h
Properties Min. Max
Tests on Emulsion:

Viscosity SSF @ 25°C, sec
AASHTO Designation T-59
15 90
Sieve Test, %
AASHTO Designation T-539
— 0.30
Storage Stability, 1 day, %
AASHTO Designation T-59
— 1
Residue by Evaporation, %
California Test 331
57 —
Particle Charge
AASHTO Designation T-59 Positive

Tests on Residue from Evaporation Test
Penetration, 25°C
AASHTO Designation: T 49
40 90
Ductility, 25°C, mm
AASHTO Designation: T 51
400 —
Torsional Recovery, %
California Test 332
18 —
or
Polymer Content, %
California Test 401

2.5 —
Note: When the test for polymer content of polymer modified asphaltic emulsion is used, see sampling requirements in Section 94-1.03, "Sampling" of the Standard Specifications.

At the time of delivery of each shipment of asphalt, the vendor supplying the material will deliver to the purchaser certified copies of the test report. The test report shall indicate the name of the vendor, type and grade of asphalt delivered, date and point of delivery, quantity delivered, delivery ticket number, purchase number, and results of the specified tests. The report shall show the results of the tests on individual materials and shall compare their values to those required by these special provisions. The report shall clearly show the proportions of aggregate, filler (minimum and maximum), water (minimum an d maximum), set control additive, and PMCQS-1h solids content (minimum and maximum) based on the dry weight of aggregate. The test report signed by an authorized representative of the vendor shall certify that the product delivered conforms to the specifications of the type and grade indicated. The certified test reports and the testing required in connection with the reports shall be at no cost to the City. Until the certified test reports and samples of the materials have been checked by the Engineer to determine conformity with the prescribed requirements, the material to which the report related and any work in which it may have been incorporated as an integral component will be only tentatively accepted by the City.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 235

Final acceptance will be dependent upon the determination of the City Inspector that the material involved fulfills the prescribed requirements.

All Calibration Sheets require a signature from a Third Party Engineer (City will not accept the contractor calibrating their own trucks).

The retardant shall be of a type that will prevent slurry mix from setting up prematurely in the spreader box and to ensure the applied slurry mix can support vehicular traffic within 60 minutes after the last application. A retardant, when used, shall be in liquid form when added to the slurry mix in the mixing chamber of the continuous mixer. Any proposed retardant and proportioning system shall be subject to evaluation and approval by the City Inspector at the pre-construction meeting.

Sufficient water must be used to obtain a mix consistency that is smooth and homogeneous and does not segregate on standing.
920-0
3 Construction

1. Scheduling
The CONTRACTOR shall prepare the roadway and place the Slurry Seal within a 5 working day period.

Any roadway area that contains existing weed growth shall be treated with an Environmental Protection Agency (EPA) approved herbicide composed of glyphosate and oryzalin, combined and applied according to label directions.

Some of the streets require digouts. This work shall be accomplished no more than 2 weeks or 10 working days prior to the placement of the slurry seal. Failure to comply with these provisions shall incur a liquidated damage of $250 per calendar day per str eet segment.

Allow at least 48 hours to cure before trash pickup. Slurry Seal must be laid down at least 2 days prior to scheduled trash pickup.

The Contractor must coordinate with Waste Management for trash pickups schedule.

The CONTRACTOR shall comply with Section F2- 2 of this project manual including all traffic control and notice requirements.

2. S
lurry Application
Each machine shall have a spray bar attached to enable the fogging of the pavement surface with water.

The CONTRACTOR shall apply the slurry using a minimum of two continuous mixers, one mixer to be applying slurry, while the other machine is in transit to and from the batch site.

The CONTRACTOR shall provide a coordinator, at least one competent quickset mixing man, one driver for the mixer applying the slurry, and one shuttle driver for the machine en route to reload. The CONTRACTOR shall also provide sufficient laborers for any handwork and cleanup required to ensure proper progress of work. Additionally CONTRACTOR shall implement full time quality control measures during the application.

Transit mix trucks shall not be used.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 236

Prior to placement, all existing utility lids and covers shall be located and referenced so they can be exposed after the slurry seal placement.

Prior to applying slurry seal, the surface to be sealed shall be cleaned by the CONTRACTOR, to the approval of the City Inspector, of all loose material, silt, vegetation, and other objectionable material by a method approved by the City Inspector. The surface may be pre-wetted by fogging ahead of the slurry box if required by local conditions. Water used in pre- wetting the surface shall be applied at such a rate that the entire surface is damp with no ponding of water.

Slurry seal shall only be placed when both pavement and air temperatures are at least 50°F and rising. Do not place slurry seal if either the pavement or air temperature is below 50°F and falling or during unsuitable weather. The expected high temperature must be at least 65°F within 24 hours after placement. Slurry seal shall not be placed if rain is imminent or if there is the possibility that there will be freezing temperatures within 24 hours.

The applied slurry seal shall be rolled with a m inimum of three passes with a pneumatic roller prior to opening to traffic.

Protection and maintenance of the street surface to the condition required for proper slurry application shall be the sole responsibility of the CONTRACTOR and no additional expense will be allowed. The CONTRACTOR shall, at the direction of the City Inspector repair and reseal all areas of the streets which have not been sealed properly and completely or have been damaged by traffic.

The CONTRACTOR shall exercise care to prevent slurry from being deposited on concrete surfaces. The CONTRACTOR shall remove slurry from surfaces not designated to be sealed each day. No additional streets shall be slurry sealed until this clean- up has been performed. The method of slurry removal shall be approved by the City Inspector. All streets to be slurry sealed shall be sealed from edge of pavement to edge of pavement. Spreaders to be used for this operation shall meet the approval of the City Inspector.

The sites for stockpiling and batching materials shall be clean and free from objectionable materials and shall be located outside the road right -of-way. Arrangements for these sites shall be the responsibility of the CONTRACTOR. If on private property, a written agreement shall be approved by the Planning Department prior to commencing operations.

Requests for changes in the schedule must be submitted to the City Inspector for approval at least 48 hours prior to sealing the streets affected.

CONTRACTOR shall tie off survey monuments, manholes, water valves, etc. prior to application of the slurry seal. The CONTRACTOR shall take precautions to remove any slurry that may cover these appurtenances.

Immediately before commencing the slurry seal operation, all surface metal utility covers (including survey monuments) shall be protected by thoroughly covering the surface with an appropriate adhesive and oiled or plastic paper. No adhesive material shall be permitted to cover, seal or fill the joint between the frame and cover of the structure. Covers are to be uncovered and cleaned of slurry material by the end of the same work day. Raised pavement markers shall be covered or cleaned after the application of the seal coat as approved by the Engineer.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 237

Hand tools shall be available to remove spillage. Ridges or bumps in the finished surface will not be permitted.

3. S treet Maintenance and Sweeping
After completing, setting, and rolling of the slurry seal, any loose material shall be immediately removed by sweeping with a power sweeper and/or vacuum sweeper the day of application. Interim sweeping using a power sweeper and/or vacuum sweeper shall be accomplished as more loose material appears. As a minimum, interim sweeping shall be accomplished on the 3rd, 7th, 14th and 21st day after slurry sealing. A final post construction sweeping of all the slurry seal streets shall be performed 30 days after completion of all of the slurry sealing. The entire street surface, including sidewalks and driveways, shall be swept to the satisfaction of the CITY. No loose material will be allowed in the street, gutters, sidewalks or other areas. Special attention shall be directed to the cul -de-sac areas. If necessary, the CONTRACTOR will employ additional vacuum sweepers to remove the loose materials.

In addition, all misapplied slurry on gutter lips shall be removed the same day as the slurry is placed. Failure to provide cleaning or sweeping shall preclude the CONTRACTOR from continuing with further slurry sealing work until this work is performed.

The CONTRACTOR shall complete any sweeping or street maintenance within 24 hours of request from the City.

Failure to complete sweeping as required or directed by the engineer shall subject the CONTRACTOR to a liquidated damage of $ 1,000 per day per street. Sweeper sequence shall be verified and approved by the City’s representative.

Street sweeper shall not leave job site until work has been approved by the City’s representative. Failure to do so will subject the Contractor to liquidated damages also in the amount of $1,000 per occurrence.

Final cleaning of the Slurry Seal streets shall include removal of any tracked material, misapplied tack coat; or slurry seal; cleaning of all utility covers of any new or old materials; and removal of any miscellaneous debris resulting from construction activities.

4. Te
mporary Traffic Control After Application
The CONTRACTOR shall implement appropriate temporary traffic control methods immediately following application of slurry seal. Temporary traffic control shall continue to be implemented and maintained until permanent pavement markings are applied. The Engineer shall approve all temporary traffic control methods prior to being implemented. 920-0
4 Measurement and Payment
“Crack Seal and Slurry Seal (Type II)” will be measured and paid for at the contract unit Ton (TN). TN is calculated as an extra- long ton of slurry made up of 2,000 pounds of dry aggregate plus asphalt emulsion. The unit price paid per TN includes all costs associated with surface preparation, including crack sealing, furnishing and placing materials required for the Type II Emulsion- Aggregate Slurry, sweeping, all labor, equipment , tools and incidentals needed to complete the work in place per plans, specifications and details.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 238

No payment will be made for quantities of aggregate and/or asphaltic emulsion which exceed 105% of the calculated quantity required to cover the application area shown on the plans in compliance with the approved mix design.

END OF SECTION 920

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 239

SECTION 921 - OVERSIDE DRAINS

921-0 1 General
Section 921 includes specifications for constructing overside drains and references 2018 CalTrans Standard specification.

Excavation and backfill must comply with section 19-3.
921-02 Submittals
Submit a certificate of compliance for each of the following materials:

1. Steel Pipe

921-0 3 Quality Assurace
Joints for overside drains must comply with section 61-2.01D(2)(a) for watertightness. 921-0 4 Materials
General
For alternative pipe downdrain, choose one of the types shown.

Fabrication of overside drain materials must comply with the details and dimensions shown.

If authorized, minor variations may be used to allow the use of the manufacturer's standard jigs and templates during the fabrication. The material thickness must be not less than the thickness described.

For pipe downdrains under concrete slope paving, the end of the downdrain must consist of steel pipe or steel conduit.

Do not mix steel and aluminum pipe in the same installation. You may use the anchor assemblies shown with an aluminum installation if the anchor assemblies are electrically insulated.

Plastic pipe and fittings used for overside drains must be from 1 manufacturer for each installation. Welding workmanship and techniques must be equal to the best practice in modern commercial shops.

Steel Pipe Overside Drains
Steel entrance tapers, pipe downdrains, reducers, coupling bands, and slip joints must be fabricated from galvanized steel sheets and must comply with AASHTO M 36 and section

66. The nominal thickness of the sheet must be at least 0.064 inch. The pipe must be Type I pipe under AASHTO M 36.

Steel tapered inlets and flume downdrains must be fabricated from steel sheets under section 69-1.02B.

Coupling bands for corrugated steel pipe must comply with either section 69-1.02B or section 61- 2.01D(2)(b) for downdrain pipe.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 240

The weight of galvanizing for overside drain materials must comply with ASTM A123/A123M and A153/A153M.

Galvanized surfaces on overside drain materials that are damaged must be repaired under section 75- 1.02B.

Cable Anchorage System
Cable anchorage systems for pipe downdrains must comply with section 69-1.02E.

Cables, welded steel eyes, steel rods, turnbuckles, thimbles, cable clamps, and anchor plates must comply with specifications for similar materials in section 83-1.02B.

Steel pipe must comply with specifications for pipe posts in section 56-2.02F.

Concrete for concrete anchors must comply with the specifications for minor concrete except the concrete must contain at least 420 pounds of cementitious material per cubic yard.

Protective Coatings
If described as coated, metal overside drains must be protected with coating under section 66-1.02C.

If a protective coating is applied to a metal overside drain, each section of the downdrain pipe and each accessory must have the nominal thickness of the metal clearly identified on the inner surface with paint or other authorized means.

Repair damaged coatings under section 66-1.02C.
921-0 5 Construction
Install entrance tapers and tapered inlets so that they function properly and efficiently, keep material in the dike, and prevent water from percolating under or around them. The seal between the taper or inlet and the surrounding material must be watertight.

Connect an entrance taper to a downdrain pipe by means of a band coupler or a slip joint.

Weld or rivet bulkheads and outlet pipes or flume pieces to the taper or inlet to form watertight connections.

Securely anchor a downdrain to the slope of the ground as shown if the downdrain is not in a trench.

Cable must not contact soil in finished position. Either adjust position or replace affected portion of cable with galvanized steel rod of equivalent diameter.

If a plastic pipe joint restrainer assembly under Alternative A is used, install it immediately below the pipe bell.
921-06 Measurement and Payment
“Remove & Replace Overside Drain” will be measured and paid for at the contract unit Each. The payment quantity includes the length of elbows, wyes, tees, and other branches to the point of intersection. If the pipe is cut to fit a structure or slope, the payment quantity is the length of pipe necessary to be placed before cutting, measured in 2-foot increments.

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 241

Payment for the length of slip joints is not included in the payment for pipe downdrain. The payment quantity for pipe downdrains under concrete slope paving is measured from the beginning of the corrugated steel pipe to the end of the downdrain..

END OF SECTION 921

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 242

APPENDIX A

CURB RAMP SUMMARY TABLE

DocuSign Envelope ID: 185BD4EB-6A54-45F3-A8D9-C2968A5C3B48 243
CITY OF GOLETA
FY 2022 PAVEMENT IMPROVEMENT PROJECT
APPENDIX A ‐ CURB RAMP SUMMARY TABLE
CURB RAMP SIDEWALK CONFORM CURB & GUTTER EXISTING VALLEY GUTTER NEW VALLEY GUTTER REMOVE PCC   RED CURB PAINT

QUADRANT TYPE (SF) (SF) (LF) (SF) (SF) (SF) (LF)
1 NW New
2 NE New
3 SW A 155 118.75 35 Street Sign @ Ramp Area
4 SE A 150 99.75 31 17.5
5 NE A 182 116.5 42 Cable TV Box @ Ramp
6 SE C 143 84.5 40
7 NW A 126.5 81 37
8 NE A 304 64 41
9 NW A 218.5 99 41
10 NE A 231 98 40.5 21.5
11 NW A 165 81 42
12 SW C 140 75 33 Gate Post @ Ramps
13 NE A 165 85.5 42 TV Cable Box and Light Post @ Conform 14 SE C 114 137 34
15 NW A 170.5 89.25 41
16 NE A 192 95 40
17 NW A 180 80 29
18 SW A 144 128.25 39.5
19 NE A 180 47 23.5
20 SE C 122.5 115.75 42.5 Cable TV Box and Light Post @ Conform 21 NW A 176 124 35 Two Triffic Signal Box @ Ramp
22 SW
A 172.5 115.5 40 Two Triffic Light Box @ Ramp
23 NE C 97.5 47.5 39.5
24 SE C 123.75 38.5 33 Electric Box @ Ramps
25 NW CM 60 52.5 14
26 NE CM 72.5 12.5 24.5 Water Meter Box @ Ramp
27 SW CM 67.5 32.5 17
28 NE‐E A 195.5 328.5 28.5
29 SE A 145 147 40
30 NW CM 75 27.5 31.5
31 NE CM 60 17.5 27
32 NW CM 65 25 27.5
33 NE CM 70 22.5 23.5
34 NW CM 72.5 25 29.5 38.5
35 NE CM 60 22.5 17
38 NW A 170 104.5 26
39 NE A 147.25 57.5 25
40 NW A 150 47.75 47
41 NE A 156.75 79.5 33 10
42 NW A 145 67.5 36
43 SW A 135 80.25 21.5
44 NW A 165 80.25 24
45 SW A 190 55.75 25.5 Root Issues
46 SW A 205 115.75 51
47 SE F 8 04 01 0
48 NW A 150 72.5 24
49 NE A 155 96 25 Street Sign @ Ramp
50 NW
A 165 68 24.5
51 NE A 155 78 25
52 NW A 165 87 28.5
53 SW A 180 60 33 Stop Sign @ Ramp
54 NE A 126 48.5 32
55 NW C 105 33 25 Stop Sign @ Ramp
56 NE C 105 45 30
57 SE C 111 96 32.5 Root Issues
58 NE A 155 85.25 26
59 NW A 155 70 23.5
60 SW C 105 42.5 24.5
61 SW A 155 63.5 34 8
62 NW A 140 88.5 31.5
63 SE A 155 81.25 22
64 NE A 150 90 41 10
65 SW A 160 103 33
66 SE A 150 66 33 Street Sign @ Ramp, TV Cable Box @ Conform 67 SW A 160 61 44 Street Sign @ Ramp, Root Issues
68 NW A 145 42.75 25.5
69 NE A 150 155.75 35.5 Street Sign @ Ramp, Root Issues 70 SE
A 137.75 106.5 33.5
71 SW A 145 92 20.5
72 SE A 150 90.5 23 Bushes @ Ramps Area
73 San Rossano Drive SW A 142.5 79 40 Bushes @ Ramps Area COMMENTSNo Area  MAIN STREET CROSS STREET CURB RAMP
Cannon Green Drive ‐ 1 Lowell Way
Hollister Avenue
Lowell Way
Phelps Road ‐ 10 Phelps Road
Pacific Oaks Road
Girsh Park
Mils Way
Girsh Park
Whitman Street
Storke Road
Bayberry Lane
Children's Center
Private Parking
Caseta Way
Camino Venturoso
Camino Venturoso  Camino Venturoso
Covington Way
Camino Venturoso
Covington Place
N La Patera Lane
Camino Talavera
Camino Caseta
Covington Way
Camino Talavera
Camino Talavera
Covington Way  Camino Laguna Vista
Padova Drive ‐ 5 Padova Drive
Salisbury Avenue
Deerhurst Drive
Brandon Drive
Carlisle Way
Covington Neighborhood
Camino Venturoso

Page 1 of 2 ends