Table 20. Cost-effectiveness and Compliance Summary – Quick-Service Restaurant (with cooking electrification)
CZ Utility
All-electric
Code Min EE EE + LF
cz01 PG&E - 6% 15%
cz02 PG&E - TBD 2%
cz03 PG&E - 10% 14%
cz04 PG&E - 8% 10%
cz04-2 CPAU - 8% 10%
cz05 PG&E - 10% 17%
cz05-2 SCG - 10% 17%
cz06 SCE - 6% 10%
cz07 SDG&E - 11% 14%
cz08 SCE - TBD TBD
cz09 SCE - TBD TBD
cz10 SDG&E - TBD TBD
cz10-2 SCE - TBD TBD
cz11 PG&E - TBD 0%
cz12 PG&E - TBD TBD
cz12-2 SMUD - TBD TBD
cz13 PG&E - TBD TBD
cz14 SDG&E - TBD TBD
cz14-2 SCE - TBD TBD
cz15 SCE - TBD 2%
cz16 PG&E - - -
Cell Color
Cost effective on both TDV/On-Bill metrics
Cost effective on either TDV/On-Bill metrics
Compliant, not cost effective
Not compliant nor cost effective
Cell Value
X% EffTDV Compliance Margin percentages (Lowest common) Compliant on both Manual and Software output approaches TBD Likely to comply with future modeling updates or software versions, maybe compliant on either Manual or Software output approach - Not compliant on either approach
Cell Color
Cost effective on both TDV/On-Bill metrics
Cost effective on either TDV/On-Bill metrics
Compliant, not cost effective
Not compliant nor cost effective
Cell Value
X% EffTDV Compliance Margin percentages (Lowest common) Compliant on both Manual and Software output approaches TBD Likely to comply with future modeling updates or software versions, maybe compliant on either Manual or Software output approach - Not compliant on either approach
251
277
Cost-effectiveness Analysis: Nonresidential New Construction 46 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
5.4 Small Hotel
The Team analyzed EE package over mixed fuel baseline and three electrification packages - Code Min, EE, EE+PV, with results in Table 21.
▪ Results support reach code adoption for energy efficiency measures over mixed fuel baseline, also known as “Electric-Preferred” reach code pathway with 2-5% compliance margin. ▪ All-electric packages with efficiency measures and/or solar PV in most CZs are cost-effective and likely to be compliant in future with modeling and/or software version updates. Some climate zones are compliant currently across either one of the Manual or Software output approaches. ▪ All all-electric scenarios are labeled as “TBD” because 36% of conditioned floor area is nonresidential space and has the same system type limitation as Medium Office (see Section 5.1). Hence, the Small Hotel will be re- evaluated as well with a central heat pump boiler system instead of electric resistance VAV system in early 2023. The current results show compliance on either one of the Manual or Software output approaches in some climate zones with efficiency measures and solar PV, still labeled as “TBD” until the software inconsistencies are resolved.
Table 21. Cost-effectiveness and Compliance Summary – Small Hotel.
Mixed Fuel
EE Code Min EE EE + PV
cz01 PG&E 5% TBD TBD TBD
cz02 PG&E 4% TBD TBD TBD
cz03 PG&E 5% TBD TBD TBD
cz04 PG&E 5% TBD TBD TBD
cz04-2 CPAU 5% TBD TBD TBD
cz05 PG&E 5% TBD TBD TBD
cz05-2 SCG 5% TBD TBD TBD
cz06 SCE 5% TBD TBD TBD
cz07 SDG&E 4% TBD TBD TBD
cz08 SCE 5% TBD TBD TBD
cz09 SCE 5% TBD TBD TBD
cz10 SDG&E 5% TBD TBD TBD
cz10-2 SCE 5% TBD TBD TBD
cz11 PG&E 3% TBD TBD TBD
cz12 PG&E 4% TBD TBD TBD
cz12-2 SMUD 4% TBD TBD TBD
cz13 PG&E 3% TBD TBD TBD
cz14 SDG&E 4% TBD TBD TBD
cz14-2 SCE 4% TBD TBD TBD
cz15 SCE 5% TBD TBD TBD
cz16 PG&E 2% TBD TBD TBD
CZ Utility All-electric
Cell Color
Cost effective on both TDV/On-Bill metrics
Cost effective on either TDV/On-Bill metrics
Compliant, not cost effective
Not compliant nor cost effective
Cell Value
X% EffTDV Compliance Margin percentages (Lowest common) Compliant on both Manual and Software output approaches TBD Likely to comply with future modeling updates or software versions, maybe compliant on either Manual or Software output approach - Not compliant on either approach
252
278
Cost-effectiveness Analysis: Nonresidential New Construction 47 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
The Team analyzed an additional scenario that proposes PTHP compared to the same SZAC mixed fuel baseline model, results shown in Table 22. Though PTHP is a much cheaper alternative than SZHP, it is not compliant by itself.
Table 22. Cost-effectiveness and Compliance Summary – Small Hotel (PTHP) CZ Utility
All-electric
Code Min
(PTHP)
cz01 PG&E -
cz02 PG&E -
cz03 PG&E -
cz04 PG&E -
cz04-2 CPAU -
cz05 PG&E -
cz05-2 SCG -
cz06 SCE -
cz07 SDG&E TBD
cz08 SCE TBD
cz09 SCE TBD
cz10 SDG&E -
cz10-2 SCE -
cz11 PG&E -
cz12 PG&E -
cz12-2 SMUD -
cz13 PG&E -
cz14 SDG&E -
cz14-2 SCE -
cz15 SCE -
cz16 PG&E -
Cell Color
Cost effective on both TDV/On-Bill metrics
Cost effective on either TDV/On-Bill metrics
Compliant, not cost effective
Not compliant nor cost effective
Cell Value
X% EffTDV Compliance Margin percentages (Lowest common) Compliant on both Manual and Software output approaches TBD Likely to comply with future modeling updates or software versions, maybe compliant on either Manual or Software output approach - Not compliant on either approach
253
279
Cost-effectiveness Analysis: Nonresidential New Construction 48 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
6 Conclusions
The Reach Code Team developed a variety of packages involving fuel substitution, energy efficiency, load flexibility, and solar PV, simulated them in building modeling software, and gathered costs to determine the c ost-effectiveness of multiple scenarios. The Team coordinated with multiple utilities, cities, and building community experts to develop a set of assumptions considered reasonable in the current market. Changing assumptions, such as the period of analysis, measure selection, fuel costs, other costs, energy escalation rates, software or utility tariffs may change the results.
These results, including the attached Reach Code Results Workbook, indicate all-electric packages are capable of achieving the greatest GHG savings as compared to mixed-fuel buildings, see Appendix 8.5. Jurisdictions may adopt a variety of reach codes such as “Energy Efficiency”, “Electric-Preferred”, “All-Electric” or “All-Electric + Efficiency.” In summary:
▪ The Reach Code Team has identified a cost-effective and code compliant energy efficiency measure package for most prototypes and climate zones analyzed, which supports an “Electric-Preferred” and/or “Energy Efficiency” reach code pathways for jurisdictions.
▪ “All-Electric” reach codes are feasible for all building types and climate zones when Part 11 is modified , including some exceptions.
• All-electric HVAC consisting of packaged single zone systems, including rooftop units in the Medium Retail and Quick-Service Restaurant, and single zone heat pumps in the Small Hotel guest rooms, are widely shown to be cost-effective and energy code compliant, with exceptions in CZs 1 and 16. • All-electric SHW systems have a prescriptive pathway for all building types and h ave not been shown to be an impediment to cost-effectiveness or energy code compliance of all-electric packages in this study.
• All-electric laundry in the Small Hotel can be cost-effective with added energy efficiency and additional solar PV than required prescriptively by 2022 Title 24 code. • Medium Office all-electric packages are cost-effective with energy efficiency and load flexibility measures, but not code compliant due to the use of electric resistance VAV reheat systems. The Small Hotel faces a similar issue for its smaller nonresidential area HVAC systems in some climate zones.
This indicates that further efficiency measures would need to be added to achieve energy code compliance which may not be cost-effective. As described in Sections 5.1 and 5.4, modeling limitations impacted the code compliance results for the medium office and nonresidential portion of the small hotel. These prototypes will be re-evaluated using a more appropriate central heat pump boiler HVAC system, likely available in compliance software in early 2023. In the meantime, jurisdictions can choose to exempt building systems that do not have a prescriptive compliance pathway in the energy code. See Berkeley’s all-electric ordinance (Berkeley 2019) section 12.80.040.A Exception 1 for an example.
▪ Commercial kitchen electrification is challenging to design cost-effectively currently. These results align with a previous study focusing on restaurants (Statewide IOU Team 2022). Jurisdictions may choose to exempt cooking appliances until cost-effectiveness factors improve. See Menlo Park's ordinance (Menlo Park 2019) 100.0(e)2.A Exception 4 for an example.
▪ For the Medium Retail prototype in CZs 2 to 15, there is already a prescriptive pathway to comply with packaged single zone heat pumps in smaller (<240 kBtuh) thermal zones. This study supports an “All-Electric + Efficiency” reach code pathway for many climates. However, mixed-fuel scenarios with SZAC and gas furnaces for larger (>240 kBtuh) thermal zones are challenging to show cost-effectiveness and/or code compliance, except for climate zones 7 and 9, when including efficiency measures. 254
280
Cost-effectiveness Analysis: Nonresidential New Construction 49 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Further discussion is required at the jurisdiction and community members to review results and determine appropriate reach code pathways. Please refer to the limitations of this study, described in Section 2.5, while using them to inform reach code policies. Of note:
▪ The Team employed several CBECC ruleset modifications to support achieving cost-effective packages, especially load flexibility measures. Ruleset modifications cannot be used by the building industry for code compliance without supporting justification or alternate methods. Where jurisdictions want to encourage the adoption of Load Flexibility measures through modeling estimates, the Reach Code Team can support cities and building applicants by providing modeling approximations that may achieve sim ilar energy and compliance total impacts, in coordination with the Energy Commission. For example, for the Demand Response Lighting measure, the Team may be able to share a TDV/ft2 impact of the measure in that climate zone or provide guidance to the building applicant’s energy consultant on appropriate modeling and documentation. ▪ Results are predominantly based on the code compliance metrics that are manually calculated based on the mixed fuel baseline model and not the standard design model assumed by the current software version. The Team also provided software reported compliance metrics in the workbook for reference. The Team is in communication with software development team to resolve differences in future iterations of this study and the software and improve code compliance reporting.
Even considering the limitations, this study has identified a set of reach code pathways for all climate zones, and jurisdictions have broad discretion on how to interpret the study’s findings. Jurisdictions can adopt reach codes requiring energy efficiency via a Title 24 Part 6 local amendment, or electrification via a Title 24 Part 11 (or municipal code) amendment, or both. Jurisdictions may choose to except particular building systems from certain reach codes pathways.
255
281
Cost-effectiveness Analysis: Nonresidential New Construction 50 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
7 References
Berkeley. 2019. Local Energy Codes.
https://localenergycodes.com/download/398/local_government_adoption_ordinance/fieldList/Berkeley%20 2019%20All-Electric%20-%20Ordinance%207672.pdf.
California Building Energy Code Compliance. 2022. CBECC Title-24 Compliance Software. August 2. https://bees.noresco.com/software2022.html.
California Public Utilites Commission. 2022. "Workpaper and Disposition Archive." SWAP005. June 9. http://deeresources.net/workpapers.
California Technical Forum. 2022. THE CA ELECTRONIC TECHNICAL REFERENCE MANUAL (ETRM). June 9. http://www.caltf.org/etrm-overview.
E3. 2021. https://efiling.energy.ca.gov/GetDocument.aspx?tn=233260&DocumentContentId=65748 .
E-CFR. 2020. https://www.ecfr.gov/cgi-
bin/retrieveECFR?gp=&SID=8de751f141aaa1c1c9833b36156faf67&mc=true&n=pt10.3.431&r=PART&ty=HTM L#se10.3.431_197. https://www.ecfr.gov/cgi-
bin/retrieveECFR?gp=&SID=8de751f141aaa1c1c9833b36156faf67&mc=true&n=pt10.3.431&r=PART&ty=HTM L#se10.3.431_197.
Energy + Environmental Economics. 2019a. "Residential Building Electrification in California." April. Accessed 8 2, 2022. https://www.ethree.com/wp-
content/uploads/2019/04/E3_Residential_Building_Electrification_in_California_April_2019.pdf.
Energy and Environmental Economics, Inc. 2017. "2019 Update to the Title 24 Part 6 Building Energy Efficiency Standards: Rooftop Solar PV System." September. Accessed 8 2, 2022. file:///C:/Users/mflores/Downloads/TN221366_20171002T104342_Rooftop_Solar_PV_Stystem_Report%20( 1).pdf.
Lawrence Berkeley National Lab. 2020. Proving the Business Case for Building Analytics. October. http://smart- energy-analytics.org/assets/EMIS%20Report.pdf.
Menlo Park. 2019. Local Energy Codes.
https://localenergycodes.com/download/353/local_government_adoption_ordinance/fieldList/Menlo%20Pa rk%202019%20-%20Ordinance%201057.pdf.
Milpitas. 2019. Local Energy Codes.
https://localenergycodes.com/download/356/local_government_adoption_ordinance/fieldList/Milpitas%20L ocal%20Ordinance%20NO%2065%20148.pdf.
National Renewable Energy Laboratory. 2016. "U.S. Solar Photovoltaic System Cost Benchmark: Q1 2016." NREL.gov.
September. Accessed 8 2, 2022. https://www.nrel.gov/docs/fy16osti/66532.pdf.
Navigant Consulting. 2018. "California LED Pricing Analysis." January. https://www.calmac.org/publications/LED_Pricing_Analysis_Report_-_Revised_1.19.2018_Final.pdf.
NORESCO. 2020. "Time Dependent Valuation of Energy for Developing Building Efficiency Standards." https://efiling.energy.ca.gov/GetDocument.aspx?tn=233257&DocumentContentId=65743 .
San Diego Gas and Electric Company. 2012. "Commercial Kitchen Demand Ventilation Controls-Electric." June 15. https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.sdge.com%2Fsites%2Fdefault%2F files%2FWPSDGENRCC0019%252520Rev%2525200%252520Demand%252520Ventilation%252520Controls_0. doc&wdOrigin=BROWSELINK.
Statewide CASE Team. 2020. August. https://title24stakeholders.com/wp-content/uploads/2020/08/NR-Grid- Integration_Final-CASE-Report_Statewide-CASE-Team.pdf.
256
282
Cost-effectiveness Analysis: Nonresidential New Construction 51 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
—. 2011 C. "Fan Control and Integrated Economizers." September. https://title24stakeholders.com/wp- content/uploads/2020/01/2013_CASE-Report_Fan-Control-and-Integrated-Economizers.pdf. —. 2020 A. Multifamily Domestic Hot Water. September. https://title24stakeholders.com/wp- content/uploads/2020/09/2022_T24_Final-CASE-Report-MF-DHW-Dist.pdf. —. 2020 B. "Nonresidential High Performance Envelope." October. https://title24stakeholders.com/wp- content/uploads/2020/10/2020-T24-NR-HP-Envelope-Final-CASE-Report.pdf. —. 2021 D. "Nonresidential Indoor Lighting March." March. https://title24stakeholders.com/wp- content/uploads/2021/03/2022-T24-Indoor-Lighting_Final-CASE-Report_Statewid-CASE-Team_w- Addendum.pdf.
Statewide IOU Team. 2022. "2019 Restaurants Reach Code Cost-Effectiveness Analysis." 2 18. file:///C:/Users/mflores/Downloads/2019%20Restaurants%20Cost-eff%20Report%20(10).pdf.
TRC, P2S Engineers, and Western Allied Mechanical. 2022. "2019 Reach Code Cost-Effectiveness Analysis." February
22. https://localenergycodes.com/download/968/file_path/fieldList/2019%20Restaurants%20Cost- eff%20Report.pdf.
U.S. Department of Energy . 2021. "A National Roadmap for Grid-Interactive Efficient Buildings." May 17. https://gebroadmap.lbl.gov/A%20National%20Roadmap%20for%20GEBs%20-%20Final.pdf.
U.S. Department of Energy. 2019 B. U.S. Department of Energy. December. https://www.energy.gov/sites/default/files/2020/02/f72/2019_ssl-energy-savings-forecast.pdf. —. 2022 A. Prototype Building Models. June 9. https://www.energycodes.gov/prototype-building-models.
WELL. 2022. wellcertified.com. June 9. Accessed June 8, 2022. wellcertified.com.
257
283
Cost-effectiveness Analysis: Nonresidential New Construction 52 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8 Appendices
8.1 Map of California CZs
Climate Zone geographical boundaries are depicted in Figure 5 below. An interactive GIS location based map and zip- code based search directory is available at: Climate Zone tool, maps, and information supporting the California Energy Code
Figure 5. Map of California CZs
258
284
Cost-effectiveness Analysis: Nonresidential New Construction 53 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2 Utility Rate Schedules
The Reach Codes Team used the IOU and POU rates depicted in to determine the On-Bill savings for each prototype.
Table 23. Utility Tariffs Analyzed Based on CZ – Detailed View CZs Utility
Electric Rate (Time of Use) Gas Rate
Medium
Office
Medium
Retail QSR Small Hotel All Prototypes
CZ01 PG&E B-10 B-1 B-1 B-1 or B-10 G-NR1
CZ02 PG&E B-10 B-1 or B-10 B-1 or B-10 B-1 or B-10 G-NR1 CZ03 PG&E B-10 B-1 B-1 B-1 or B-10 G-NR1
CZ04 PG&E B-10 B-1 or B-10 B-1 or B-10 B-1 or B-10 G-NR1 CZ04-2 CPAU E-2 E-2 E-2 E-2 G-2
CZ05 PG&E B-10 B-1 B-1 B-1 or B-10 G-NR1
CZ05-2 SCG B-10 B-1 B-1 B-1 or B-10 G-10 (GN-10)
CZ06 SCE TOU-GS-2 TOU-GS-2 TOU-GS-2 TOU-GS-2 G-10 (GN-10) CZ07 SDG&E
AL-
TOU+EECC
(AL-TOU)
AL-TOU+EECC
(AL-TOU)
AL-
TOU+EECC
(AL-TOU)
AL-TOU+EECC
(AL-TOU) GN-3
CZ08 SCE TOU-GS-2 TOU-GS-2 TOU-GS-2 TOU-GS-2 G-10 (GN-10) CZ09 SCE TOU-GS-2 TOU-GS-2 TOU-GS-2 TOU-GS-2 G-10 (GN-10) CZ10 SDG&E
AL-
TOU+EECC
(AL-TOU)
AL-TOU+EECC
(AL-TOU)
AL-
TOU+EECC
(AL-TOU)
AL-TOU+EECC
(AL-TOU) G-10 (GN-10)
CZ10-2 SCE TOU-GS-2 TOU-GS-2 TOU-GS-2 TOU-GS-2 GN-3
CZ11 PG&E B-10 B-10 B-1 or B-10 B-10 G-NR1
CZ12 PG&E B-10 B-1 or B-10 B-1 or B-10 B-10 G-NR1
CZ12-2 SMUD CITS-1
(CI-TOD 1)
CITS-1
(CI-TOD 1)
CITS-1
(CI-TOD 1) CITS-1 G-NR1
CZ13 PG&E B-10 B-10 B-1 or B-10 B-10 G-NR1
CZ14 SDG&E
AL-
TOU+EECC
(AL-TOU)
AL-TOU+EECC
(AL-TOU)
AL-
TOU+EECC
(AL-TOU)
AL-TOU+EECC
(AL-TOU) G-10 (GN-10)
CZ14-2 SCE TOU-GS-2 TOU-GS-2 TOU-GS-2 TOU-GS-2 or TOU- GS-3 GN-3
CZ15 SCE TOU-GS-2 TOU-GS-2 TOU-GS-2 TOU-GS-2 G-10 (GN-10) CZ16 PG&E B-10 B-1 or B-10 B-1 or B-10 B-1 or B-10 G-NR1
259
285
Cost-effectiveness Analysis: Nonresidential New Construction 54 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.1 PG&E
Figure 6. PG&E Electric Schedule - B-1
260
286
Cost-effectiveness Analysis: Nonresidential New Construction 55 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 7. PG&E Electric Schedule - B-10
261
287
Cost-effectiveness Analysis: Nonresidential New Construction 56 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 8. PG&E Gas Schedule – G-NR1
262
288
Cost-effectiveness Analysis: Nonresidential New Construction 57 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.2 SCE
Figure 9. SCE Electric Schedule – TOU-GS-1
263
289
Cost-effectiveness Analysis: Nonresidential New Construction 58 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 10. SCE Electric Schedule – TOU-GS-2
264
290
Cost-effectiveness Analysis: Nonresidential New Construction 59 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 11. SCE Electric Schedule – TOU-GS-3
265
291
Cost-effectiveness Analysis: Nonresidential New Construction 60 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.3 SCG
Figure 12. SCG Gas Schedule – G-10
266
292
Cost-effectiveness Analysis: Nonresidential New Construction 61 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
267
293
Cost-effectiveness Analysis: Nonresidential New Construction 62 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.4 SDG&E
Figure 13. SDG&E Electric Schedule – AL-TOU
268
294
Cost-effectiveness Analysis: Nonresidential New Construction 63 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
269
295
Cost-effectiveness Analysis: Nonresidential New Construction 64 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
270
296
Cost-effectiveness Analysis: Nonresidential New Construction 65 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 14. SDG&E Electric Schedule - EECC
271
297
Cost-effectiveness Analysis: Nonresidential New Construction 66 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 15. SDG&E Gas Schedule – GN-3
272
298
Cost-effectiveness Analysis: Nonresidential New Construction 67 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
273
299
Cost-effectiveness Analysis: Nonresidential New Construction 68 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.5 CPAU
Figure 16. CPAU Electric Schedule – E-2
274
300
Cost-effectiveness Analysis: Nonresidential New Construction 69 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 17. CPAU Gas Schedule – G-2
275
301
Cost-effectiveness Analysis: Nonresidential New Construction 70 Energy Code Compliance Results and Reach Code Considerations localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.6 SMUD (Electric Only)
Figure 18. SMUD Electric Schedule – CITS-0/CITS-1
276
302
Cost-effectiveness Analysis: Nonresidential New Construction 71 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.2.7 Escalation Rates
Utility rates are assumed to escalate over time, using assumptions from research conducted by Energy and Environmental Economics (E3) in Appendix 8.2. The 2019 study Residential Building Electrification in California (Energy + Environmental Economics 2019a) and escalation rates used in the development of the 2022 TDV multipliers Table 24 below demonstrate the escalation rates used for nonresidential buildings. As stated by E3 in the TDV report, this latter assumption “does not presuppose specific new investments, changes in load and gas throughput, or other measures associated with complying with California’s climate policy goals” (i.e., business -as-usual is assumed).
Table 24. Real Utility Rate Escalation Rate Assumptions Above Inflation
Source
Statewide Electric
Nonresidential Average
Rate (%/year, real)
Statewide Natural Gas
Nonresidential Core Rate
(%/year, real)
2023 E3 2019 2.0% 4.0%
2024 2022 TDV 0.7% 7.7%
2025 2022 TDV 0.5% 5.5%
2026 2022 TDV 0.7% 5.6%
2027 2022 TDV 0.2% 5.6%
2028 2022 TDV 0.6% 5.7%
2029 2022 TDV 0.7% 5.7%
2030 2022 TDV 0.6% 5.8%
2031 2022 TDV 0.6% 3.3%
2032 2022 TDV 0.6% 3.6%
2033 2022 TDV 0.6% 3.4%
2034 2022 TDV 0.6% 3.4%
2035 2022 TDV 0.6% 3.2%
2036 2022 TDV 0.6% 3.2%
2037 2022 TDV 0.6% 3.1%
8.3 HVAC and SHW System Cost Scalers
Table 25 shows the material and labor adjustment factors used to determine the costs.
Table 25. Materials and Labor Adjustment Factors by Climate Zone Materials Labor
CZ 01 0.963 0.994
CZ 02 0.963 1.387
CZ 03 1.001 1.291
CZ 04 0.998 1.298
CZ 05 0.964 0.997
CZ 06 0.960 0.997
CZ 07 0.999 0.985
CZ 08 0.998 0.996
CZ 09 0.964 0.996
CZ 10 0.998 0.996
CZ 11 1.002 0.990
CZ 12 1.000 1.000
277
303
Cost-effectiveness Analysis: Nonresidential New Construction 72 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
CZ 13 1.000 0.990
CZ 14 0.964 0.980
CZ 15 0.963 0.996
CZ 16 0.967 0.990
Table 26 shows the contractor markup values used to determine the costs.
Table 26. Contractor Markup Values
Contractor 1 Contractor 2
General Conditions and Overhead 15% 20%
Design and Engineering 5% 10%
Permit, testing and inspection 5% 3%
Contractor Profit/Market Factor 10% 10%
8.4 Mixed Fuel Baseline Figures
Table 27. Mixed Fuel Baseline Model – Medium Office
Climate
zone Utility
Annual
Electricity
Consumption
(kWh)
Annual
Natural Gas
Consumption
(therms)
Total
kTDV/ft2
Total TDV
Compliance
kTDV/ft2
Efficiency
TDV
Compliance
kTDV/ft2
GHG
Emissions
Total TDV
Compliance
Margin
Proposed
Elec
Utility
Cost
Proposed
Gas
Utility
Cost tons/yr
CZ01 PG&E 186,894 5,331 130 10 72 63 1 $67,234 $10,377 CZ02 PG&E 163,979 3,253 142 12 107 52 2 $67,798 $6,493 CZ03 PG&E 176,640 2,672 131 5 83 48 1 $67,999 $5,352
CZ04 PG&E 163,768 2,003 125 -2 107 46 1 $68,366 $4,093 CZ04-2 CPAU 163,768 2,003 125 -2 107 46 1 $30,988 $6,966 CZ05 PG&E 170,544 2,575 113 -8 76 46 1 $66,040 $5,156
CZ05-2 SCG 170,544 2,575 113 -8 76 46 1 $66,040 $4,242 CZ06 SCE 163,722 1,066 122 -7 76 39 0 $76,817 $1,980
CZ07 SDG&E 169,611 747 114 -9 76 38 0 $120,127 $1,150
CZ08 SCE 191,703 941 130 -2 76 41 1 $83,752 $1,763
CZ09 SCE 169,514 1,119 135 0 76 41 1 $82,274 $2,046
CZ10 SDG&E 185,682 1,445 141 10 76 45 2 $134,646 $2,113 CZ10-2 SCE 185,682 1,445 141 10 76 45 2 $86,338 $2,474 CZ11 PG&E 209,343 3,309 166 40 136 59 2 $81,001 $6,669 CZ12 PG&E 178,461 2,864 145 19 118 53 2 $72,381 $5,784 CZ12-2 SMUD 178,461 2,864 145 19 118 53 2 $26,576 $5,784 CZ13 PG&E 211,193 2,377 165 37 139 55 2 $81,491 $4,852 CZ14 SDG&E 156,689 3,058 147 13 139 52 3 $128,390 $4,337 CZ14-2 SCE 156,689 3,058 147 13 139 52 3 $83,690 $4,756 CZ15 SCE 209,720 662 161 32 139 47 2 $101,041 $1,311
CZ16 PG&E 177,562 5,799 127 9 94 67 4 $68,281 $11,409
278
304
Cost-effectiveness Analysis: Nonresidential New Construction 73 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Table 28. All-electric Baseline Model – Medium Retail
Climate
zone Utility
Annual
Electricity
Consumption
(kWh)
Annual
Natural Gas
Consumption
(therms)
Total
kTDV/ft2
Total TDV
Compliance
kTDV/ft2
Efficiency
TDV
Compliance
kTDV/ft2
GHG
Emissions
Total TDV
Compliance
Margin
Proposed
Elec
Utility
Cost
Proposed
Gas
Utility
Cost tons/yr
CZ01 PG&E 138,367 0 192 110 162 28 -8 $43,917 $0
CZ02 PG&E 131,521 0 211 125 198 28 -15 $50,499 $0
CZ03 PG&E 112,237 0 176 91 156 25 -1 $36,206 $0
CZ04 PG&E 122,256 0 197 111 193 27 -5 $47,522 $0
CZ04-2 CPAU 122,256 0 197 111 193 27 -5 $22,961 $0
CZ05 PG&E 108,753 0 159 76 146 24 -8 $35,179 $0
CZ05-2 SCG 108,753 0 159 76 146 24 -8 $35,179 $0
CZ06 SCE 111,442 0 175 89 146 24 -8 $42,572 $0
CZ07 SDG&E 109,079 0 172 87 146 23 0 $71,108 $0
CZ08 SCE 129,105 0 196 107 146 26 -10 $47,404 $0
CZ09 SCE 123,673 0 193 105 146 26 -3 $46,830 $0
CZ10 SDG&E 114,235 0 174 87 146 25 4 $77,903 $0
CZ10-2 SCE 114,235 0 174 87 146 25 4 $45,763 $0
CZ11 PG&E 144,411 0 229 144 218 30 -6 $54,592 $0
CZ12 PG&E 141,639 0 221 136 211 30 -4 $53,798 $0
CZ12-2 SMUD 141,639 0 221 136 211 30 -4 $21,079 $0
CZ13 PG&E 153,371 0 244 158 236 32 -15 $56,701 $0
CZ14 SDG&E 145,499 0 223 135 236 31 -8 $86,177 $0
CZ14-2 SCE 145,499 0 223 135 236 31 -8 $52,840 $0
CZ15 SCE 146,092 0 244 158 236 29 -24 $56,750 $0
CZ16 PG&E 157,944 0 224 144 214 34 -31 $57,190 $0
279
305
Cost-effectiveness Analysis: Nonresidential New Construction 74 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Table 29. Mixed Fuel Baseline Model – Quick-Service Restaurant Climate
zone Utility
Annual
Electricity
Consumption
(kWh)
Annual
Natural Gas
Consumption
(therms)
Total
kTDV/ft2
Total TDV
Compliance
kTDV/ft2
Efficiency
TDV
Compliance
kTDV/ft2
GHG
Emissions
Total TDV
Compliance
Margin
Proposed
Elec
Utility
Cost
Proposed
Gas
Utility
Cost tons/yr
CZ01 PG&E 63,187 12,237 1,974 820 820 80 5 $20,126 $23,401 CZ02 PG&E 66,343 11,170 1,989 839 839 74 20 $21,332 $21,422 CZ03 PG&E 67,877 10,605 1,922 769 769 71 1 $21,657 $20,336 CZ04 PG&E 77,615 10,277 2,062 910 910 71 -4 $24,931 $19,725 CZ04-2 CPAU 77,615 10,277 2,062 910 910 71 -4 $15,041 $30,442 CZ05 PG&E 69,442 10,655 1,898 744 744 71 -2 $22,105 $20,416 CZ05-2 SCG 69,442 10,655 1,898 744 744 71 -2 $22,105 $14,924 CZ06 SCE 78,813 9,600 1,934 778 744 67 -1 $19,698 $13,599 CZ07 SDG&E 76,653 9,425 1,898 739 744 66 18 $26,903 $13,116 CZ08 SCE 77,418 9,554 1,948 792 744 66 28 $20,356 $13,542 CZ09 SCE 77,625 9,687 1,993 837 744 67 7 $20,405 $13,709 CZ10 SDG&E 81,897 9,907 2,032 877 744 69 26 $31,166 $13,782 CZ10-2 SCE 81,897 9,907 2,032 877 744 69 26 $21,407 $13,986 CZ11 PG&E 85,725 10,748 2,259 1,109 1,109 75 -12 $27,885 $20,664 CZ12 PG&E 74,131 10,726 2,080 928 928 72 2 $24,000 $20,605 CZ12-2 SMUD 74,131 10,726 2,080 928 928 72 2 $11,272 $20,605 CZ13 PG&E 88,060 10,441 2,240 1,089 1,089 73 -2 $28,620 $20,070 CZ14 SDG&E 87,498 10,655 2,251 1,097 1,089 74 -31 $30,692 $14,728 CZ14-2 SCE 87,498 10,655 2,251 1,097 1,089 74 -31 $22,471 $14,925 CZ15 SCE 118,353 9,194 2,444 1,289 1,089 71 -13 $28,746 $13,090 CZ16 PG&E 75,373 12,242 2,143 983 983 82 2 $24,194 $23,494
280
306
Cost-effectiveness Analysis: Nonresidential New Construction 75 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Table 30. Mixed Fuel Baseline Model – Small Hotel
Climate
zone Utility
Annual
Electricity
Consumption
(kWh)
Annual
Natural Gas
Consumption
(therms)
Total
kTDV/ft2
Total TDV
Compliance
kTDV/ft2
Efficiency
TDV
Compliance
kTDV/ft2
GHG
Emissions
Total TDV
Compliance
Margin
Proposed
Elec
Utility
Cost
Proposed
Gas
Utility
Cost tons/yr
CZ01 PG&E 230,187 16,824 299 161 173 137 7 $72,520 $32,208 CZ02 PG&E 243,164 13,161 287 152 169 117 5 $77,188 $25,351 CZ03 PG&E 232,511 12,725 272 136 151 113 6 $73,496 $24,461 CZ04 PG&E 251,386 11,608 280 146 165 109 5 $80,034 $22,342 CZ04-2 CPAU 251,386 11,608 280 146 165 109 5 $48,175 $34,218 CZ05 PG&E 232,585 12,375 264 127 143 111 6 $73,479 $23,746 CZ05-2 SCG 232,585 12,375 264 127 143 111 6 $73,479 $17,084 CZ06 SCE 251,627 10,100 260 124 143 100 4 $53,976 $14,227 CZ07 SDG&E 250,625 9,977 257 120 143 100 3 $77,312 $13,878 CZ08 SCE 271,204 9,874 269 136 143 101 3 $60,488 $13,943 CZ09 SCE 265,607 10,246 273 140 143 103 4 $60,896 $14,411 CZ10 SDG&E 276,218 9,903 276 142 143 102 3 $91,917 $13,642 CZ10-2 SCE 276,218 9,903 276 142 143 102 3 $63,534 $13,980 CZ11 PG&E 285,482 12,457 315 179 197 118 4 $82,170 $24,172 CZ12 PG&E 263,561 11,890 293 158 176 112 2 $76,104 $23,029 CZ12-2 SMUD 263,561 11,890 293 158 176 112 2 $34,853 $23,029 CZ13 PG&E 293,124 11,309 310 175 193 113 1 $84,632 $21,924 CZ14 SDG&E 276,292 12,071 298 166 193 115 2 $89,492 $16,232 CZ14-2 SCE 276,292 12,071 298 166 193 115 2 $63,611 $16,703 CZ15 SCE 349,319 7,895 309 174 193 98 -4 $78,507 $11,458 CZ16 PG&E 228,611 17,363 310 170 195 142 9 $72,664 $33,471
281
307
Cost-effectiveness Analysis: Nonresidential New Construction 76 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
8.5 GHG Savings Summary
This section shows the percent GHG savings for each package. GHG multipliers in CBECC software have utility emissions multipliers assigned only to each of the California’s sixteen climate zones, does not vary by utility within each zone. Individual utility assumptions may vary widely. In the Medium Office, the GHG emissions increases in all- electric package because the proposed all-electric system is electric resistance VAV system instead of a more efficient heat pump boiler system.
Figure 19. Percentage GHG Savings – Medium Office
Figure 20. Percentage GHG Savings – Medium Retail
Mixed Fuel
EE Code Min EE EE + LF
cz01 0% 3% 4% 12%
cz02 1% 0% 1% 8%
cz03 1% 0% 1% 8%
cz04 2% -1% 1% 7%
cz05 1% 0% 2% 9%
cz06 2% 0% 2% 8%
cz07 3% 0% 3% 8%
cz08 3% 0% 2% 8%
cz09 2% -1% 2% 7%
cz10 2% -2% 0% 6%
cz11 1% -3% -1% 5%
cz12 1% -2% -1% 5%
cz13 2% -3% -1% 4%
cz14 2% -4% -2% 5%
cz15 3% -1% 2% 7%
cz16 1% 1% 2% 7%
CZ All-electric
All-electric
EE Code Min EE
cz01 -4% -2% 9%
cz02 -21% -13% 10%
cz03 -18% -8% 11%
cz04 -14% -5% 10%
cz05 -15% -5% 12%
cz06 -7% 4% 13%
cz07 -5% 7% 14%
cz08 -7% 4% 12%
cz09 -8% 3% 13%
cz10 -12% -9% 3%
cz11 -23% -21% 2%
cz12 -19% -11% 9%
cz13 -17% -8% 10%
cz14 -15% -5% 10%
cz15 -3% 0% 3%
cz16 -34% -33% 2%
Mixed FuelCZ
282
308
Cost-effectiveness Analysis: Nonresidential New Construction 77 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Figure 21. Percentage GHG Savings – Quick Service Restaurant
Figure 22. Percentage GHG Savings – Small Hotel
Mixed Fuel
EE Code Min EE EE + LF EE + PV Code Min EE
cz01 10% 21% 26% 28% 27% 47% 52%
cz02 7% 16% 19% 21% 21% 45% 49%
cz03 8% 14% 20% 22% 22% 45% 51%
cz04 7% 12% 17% 19% 19% 43% 49%
cz05 8% 14% 20% 22% 22% 45% 51%
cz06 7% 9% 15% 16% 17% 43% 48%
cz07 6% 8% 14% 15% 16% 43% 48%
cz08 4% 9% 12% 13% 14% 43% 46%
cz09 5% 9% 12% 13% 15% 43% 46%
cz10 5% 10% 13% 14% 15% 42% 46%
cz11 6% 13% 17% 18% 18% 43% 46%
cz12 6% 14% 17% 18% 19% 44% 48%
cz13 6% 12% 15% 16% 17% 43% 46%
cz14 6% 13% 16% 17% 18% 42% 46%
cz15 4% 7% 9% 11% 12% 40% 42%
cz16 8% 18% 23% 24% 24% 44% 49%
All-electric "HS" (HVAC+SHW)CZ All-electric
Mixed Fuel All-electric
EE Code Min EE EE + PV Code Min (PTHP)
cz01 13% 47% 48% 50% 47%
cz02 11% 42% 44% 47% 43%
cz03 12% 43% 45% 48% 43%
cz04 11% 41% 44% 46% 42%
cz05 11% 43% 45% 48% 43%
cz06 10% 41% 43% 46% 41%
cz07 10% 41% 43% 47% 41%
cz08 10% 40% 42% 46% 40%
cz09 10% 40% 42% 46% 40%
cz10 11% 37% 39% 43% 37%
cz11 12% 39% 41% 43% 39%
cz12 12% 38% 41% 43% 39%
cz13 11% 37% 39% 42% 37%
cz14 12% 38% 40% 44% 38%
cz15 10% 33% 35% 40% 33%
cz16 13% 43% 46% 48% 45%
CZ
All-electric
283
309
Cost-effectiveness Analysis: Nonresidential New Construction 78 Energy Code Compliance Results and Reach Code Considerations
localenergycodes.com California Energy Codes & Standards | A statewide utility program 2023-03-24
Get In Touch
The adoption of reach codes can differentiate jurisdictions as efficiency leaders and help accelerate the adoption of new equipment, technologies, code compliance, and energy savings strategies.
As part of the Statewide Codes & Standards Program, the Reach Codes Subprogram is a resource available to any local jurisdiction located throughout the state of California.
Our experts develop robust toolkits as well as provide specific technical assistance to local jurisdictions (cities and counties) considering adopting energy reach codes. These include cost-effectiveness research and analysis, model ordinance language and other code development and implementation tools, and specific technical assistance throughout the code adoption process.
If you are interested in finding out more about local energy reach codes, the Reach Code Team stands ready to assist jurisdictions at any stage of a reach code project.
Visit LocalEnergyCodes.com to
access our resources and sign up
for newsletters
Contact [email protected]
for no-charge assistance from expert
Reach Code advisors
Follow us on Twitter
284
310
ATTACHMENT 4
Building Performance Incentives
285
311
Resources for Building Electrification Rebates & Incentives Individual Programs
(Southern California Edison or Community Choice Aggregator Qualifying) Multifamily Energy Savings Program – For properties receiving service from SCE or an affiliated CCA - no-cost and reduced-cost upgrades for lighting, heating and cooling, domestic hot water, building envelope and weatherization, appliances and plug loads, still exploring electrification opportunities
SOMAH by CPUC – For installing solar photovoltaic (PV) energy systems on multifamily affordable housing
DAC-SASH Program approved by CPUC – GRID provides incentives to cover the full cost of solar panels on customer homes and enables customers to save on their bills every month, qualify through Energy For All Program
Community Solar Green Tariff by CPUC – provides local solar energy at a 20% bill discount for both income-qualified and non-income qualified residential customers in Disadvantaged Communities (DACs) who may be unable to install solar on their roof. o Solar in DACs
SCE Community Renewables Program – allows SCE customers to work directly with developers to subscribe to a portion of a renewable energy project and receive bill credits from SCE based on their portion of the project’s generation
SCE Building Electrification No Cost Program - replacing natural gas and propane appliances with high-efficiency electric equipment for homeowners
Low Income Weatherization Program - Farmworker Housing Component installs no-cost energy efficiency improvements and/or solar PV systems for qualified farmworker households. Multi- Family Energy Efficiency and Renewables Component provides technical assistance and incentives for the installation of energy efficiency measures and solar photovoltaic systems in low-income multi-family dwellings serving priority populations (PG&E Qualifying)
PG&E Green Saver Program – Provides eligible residential customers a 20% discount on electricity bills on top of any applicable CARE or FERA discounts for committing to 100% solar power
PG&E Energy Savings Assistance Program – For renters and owners, can replace old refrigerator, furnace or water heater, perform insulation and weatherproofing, energy star LED lightbulbs – based on income guidelines and number of persons in household Self-Generation Incentive Program - financial rebate program for qualified PG&E residential and business customers installing battery storage systems. May cover full cost if residing in HFTD, experienced PSPS, etc. (residential and non-residential)
Rebates/Incentives
Energy Star Instant Rebate – $90 rebate for Energy Star Certified room air conditioner HEEHRA Multifamily Electric Load Service Center – electric panel upgrades 286
312
HEEHRA Multifamily Appliance Rebate – electric stove, cooktop, range or oven *only for retrofits*
Tax Credits
Energy-Efficient New Homes Tax Credit for Home Builders - The federal Energy Policy Act of 2005 established tax credits of up to $2,000 for builders of all new energy-efficient homes, including manufactured homes constructed in accordance with the Federal Manufactured Homes Construction and Safety Standards. Single Family homes and manufactured that are certified as a zero energy ready home under the Zero Energy Ready Home Program of the U.S.
Department of Energy can receive a tax credit of $5,000 Residential Energy Efficiency Tax Credit - Owners of existing homes may receive a tax credit worth 30% of the cost of upgrading the efficiency of the building's envelope, includes things like exterior windows, insulation materials or systems designed to reduce heat loss or gain.
Equipment must meet or exceed highest efficiency tier
Federal Residential Clean Energy Credit – equals 30% of costs of new, qualified clean energy property for home battery storage
Federal Residential Clean Energy Credit – equals 30% of costs of new, qualified clean energy property for home solar electric panels
Local Searches/Engines
The Switch Is On
Database of State Incentives for Renewables & Efficiency
Other organizations with offerings:
Central Coast Community Energy
CA Energy Smart Homes
287
313
ATTACHMENT 5
CEQA Notice of Exemption
288
314
NOTICE OF EXEMPTION (NOE)
1 To: Office of Planning and Research From: City of Goleta P.O. Box 3044, 1400 Tenth St. Rm. 212 130 Cremona Drive, Suite B Sacramento, CA 95812-3044 Goleta, CA 93117
Clerk of the Board of Supervisors
County of Santa Barbara
105 E. Anapamu Street, Room 407
Santa Barbara, CA 93101
Subject: Filing of Notice of Exemption
Project Title: Ordinance Amending Title 15, Chapter 15.15 of the Goleta Municipal Code for an Energy Performance Reach Code
Project Applicant: City of Goleta
Project Location (Address and APN): Goleta City Hall, 130 Cremona Drive, Suite B Goleta, CA 93117
Description of Nature, Purpose and Beneficiaries of Project: The purpose of the Energy Performance Reach Code is to modify the California Energy Code within the City of Goleta to require a higher level of energy performance with new construction. The ordinance encourages electrification and still allows for natural gas in buildings, although additional energy performance measures may be needed to comply. These additional measures may include increased energy efficiency (i.e. higher insulation), increased solar panel system size, and battery storage systems. For newly constructed buildings where fuel gas infrastructure is permitted due to any qualifying exceptions, they would be required to have sufficient electrical capacity, including reserved circuit breakers, electrical conduit, subpanels, panels, switchboards, and transformers, to facilitate future full building electrification. The ordinance would require higher energy performance for new single family, low-rise multifamily buildings and non-residential buildings, including pre-fabricated buildings; and provide for either reduced margins or exceptions for smaller homes and accessory dwelling units . The ordinance would e xtend electric readiness requirements through exterior location for space heat pump compressor in single family , s pace and ventilation requirements for in -unit water heaters in multifamily buildings , and e lectrical capacity requirements for multifamily central hot water systems, with an option to include space, ventilation, and condensate requirements.
Pursuant to California Health and Safety Code Sections 17958.5, 17958.7, and 18941.5, the local amendments to the 2022 Edition of the California Building and Energy Code are reasonably necessary due to local climactic, geological, or topographical conditions. The amendment is in the interests of public health and safety and general community welfare by contributing to the overall reduction of greenhouse gas (GHG) emissions and the reduction of air pollutants associated with new construction. Electric heat pumps for space and water heating are more efficient than their natural gas counterparts and have the added safety benefits of lowering the potential for carbon monoxide poisoning and gas explosions. New construction provides the best oppor tunity to avoid “lock -in emissions” which would be created through the inclusion of natural gas infrastructure in new buildings.
The ordinance will help mitigate climate change and its negative effects such as extreme heat events, droughts, intense storms , and flooding in the region, thus making these amendments reasonably necessary because of local climactic, geological, and topographical reasons. The local amendments to the 2022 California Green Building 289
315
NOTICE OF EXEMPTION (NOE)
2 Standards Code implemented by this ordinance will reduce GHG emissions within the City with the intent to reduce the City’s contributions to climate change and in turn reduce the impacts of climate change.
Name of Public Agency Approving the Project: City of Goleta
Name of Person or Agency Carrying Out the Project: City of Goleta
Exempt Status: (check one)
Ministerial (Sec. 15369)
Statutory (Sec. 21080.35)
Categorical Exemption: (Sec. 15307 & 15308)
Emergency Project (Sec. 15359)
Other: (Sec 15061(b)(3))
Reason(s) why the project is exempt:
This ordinance has been assessed in accordance with the California Environmental Quality Act (Cal. Pub. Res. Code, § 21000 et seq.) ("CEQA") and the State CEQA Guidelines (14 Cal. Code Regs.§ 15000 et seq.) and is categorically exempt from CEQA under CEQA Guidelines § 15061(b)(3), which exempts from CEQA any project where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. These standards are more stringent than the State energy standards, and as such, there are no reasonably foreseeable adverse impacts, and there is no possibility that the ordinance in question may have a significant effect on the environment. Adoption of the ordinance would not be an activity with potential to cause significant effect on the environment because the adoption and local amendments to the California Energy Code are enacted to provide more protection to the environment and therefore is exempt from CEQA. Therefore, it can be seen with certainty that there is no possibility that the ordinance in question may have a significant effect on the environment; accordingly, the ordinance is categorically exempt from CEQA.
City of Goleta Contact Person and Telephone Number:
Dana Murray, Sustainability Manager, 805-961-7547
Peter Imhof Director, Planning & Environmental Review Date
290
316
NOTICE OF EXEMPTION (NOE)
3 If filed by the applicant:
1. Attach certified document of exemption finding
2. Has a Notice of Exemption been filed by the public agency approving the project?
Yes No
Date received for filing at OPR: _____________________________________________
Note: Authority cited: Sections 21083 and 211110, Public Resources Code Reference: Sections 21108, 21152.1, Public Resources Code 291
317
ATTACHMENT 6
Presentation
292
318
Energy Performance
Reach Code
Public Hearing & 2nd Reading
February 18, 2025
Presentation by:
Dana Murray, Sustainability Manager
Angeline Foshay, Management Analyst
293
319
Overview
2February 18, 2025 City Council Meeting
Collaboration with SB County & technical experts
Reach Code similar to codes adopted by other CA cities Modifies CA Energy Code to:
Improve energy performance
Require electric-readiness for new construction
Green Committee Recommended 11/21/2024
City Council 1
st Reading 2/4/2025
294
320
Background - Reach Codes
Local ordinances adopted by the local government that
exceed and enhance the state’s green building st
andards
3 Other names:
• Title 24, Part 6
• Building Energy Efficiency Standards
Scope:
• Energy efficiency
• Load flexibility (PV, battery)
• Single Family, Multifamily, and Nonresidential
February 18, 2025 City Council Meeting
295
321
Background – Building Emissions
Natural gas use in buildings is
a large source of emissions &
air pollution
Limiting GHG emissions
critical to avoid worsening
climate change impacts
New construction is
opportunity for higher ener
gy
performance & electrification
4February 18, 2025 City Council Meeting
296
322
Public Engagement
Collaboration with County, Goleta, Carpinteria, City of SB 2022-2023 Building Electrification Ordinance
Multiple public workshops & advisory group meetings
Presentations to multiple stakeholder groups
2024-2025 Energy Performance Ordinance
Presentations to South Coast Chamber of Commerce, Santa Barbara Association of Realtors, Gr
een Committee
January 14, 2025 Public Workshop
February 4, 2025 City Council Meeting
5February 18, 2025 City Council Meeting
297
323
Requirements for Energy Reach Codes
6February 18, 2025 City Council Meeting
298
324
Cost-Effectiveness
New construction all-electric buildings are cost-effective Lower upfront cost of construction compared to mixed-fuel Value of benefits exceeds the cost
Studies available at:
Local Energy Codes
State Cost-Effectiveness Explorer
Reach Code must be approved by the CA Energy
Commission to take eff
ect
7 February 18, 2025 City Council Meeting
299
325
Ordinance Overview
Requires higher energy performance for new buildings
Reduced margins or exceptions for small single-family
homes and ADUs
Encourages electrification, but allows natural gas in
buildings
Electric-Readiness Requirements
8February 18, 2025 City Council Meeting
300
326
Energy Performance
9 Building Type Performance Requirement
Single-Family Residential EDR1 compliance margin of at least 5 points Buildings <1,500 sq. ft .– EDR1 compli
ance margin of at least
2 points
Multi-Family Residential (Low) Source Energy compliance margin of at least 7% Non-Residential Source Energy compliance margin of at least the following:
Hotel – 7%
Small Restaurants
– 2%
Office – 14%
All Other Building Types – 7%
February 18, 2025 City Council Meeting
301
327
Electric-Readiness
Single Family projects using gas or
propane furnace
Wiring
Reserved space in electrical panel
Designated exterior space for future unit
Multifamily projects with individual
gas water heaters
125-volt receptacle
Designated space for future electric unit
10February 18, 2025 City Council Meeting
302
328
How does it work?
11 Title 24 reports generate compliance scores for new buildings to be constructed (EDR for single-family; Source Energy Margin for multifamily and nonresidential) February 18, 2025 City Council Meeting
303
329
Implementation & Compliance
12 Utilizes existing modeling software
Free & provided by CA; updated with every State Code change Compliance demonstrated & enforced through Title 24
energy modeling reports for new buildings
Title 24 report already part of required permit submittals 304
330
Adoption Process & Timeline
13February 18, 2025 City Council Meeting
City Council Meetings
2/4/2025 – 1st Reading – Unanimous Approval
2/18/2025 – 2nd Reading & Public Hearing
CA Energy Commission Submission for Approval
Q1-Q2 2025
Reach Code Ordinance effective
Q2-Q4 2025
305
331
Recommendation
A. Hold a public hearing and then conduct second reading by title only, waiving further reading of Ordinance No. 25-__ entitled, “An Ordinance of the City Council of the City of Goleta, California, Amending Title 15, Chapter 15.15 Entitled “Energy Code” of the Goleta Municipal Code to Adopt the 2022 Edition of the California Building and Energy Code and Local
Amendments Thereto and Determine the Ordinance to be
Exempt from the California Environmental Quality Act.”
B. Find the adoption of Ordinance No. 25-__ exempt from the California Environmental Quality Act and direct staff to file a Notice of Exemption within five (5) business days.
14February 18, 2025 City Council Meeting
306
332