Cities Index.
Irrigation Plans

Goleta City Council
June 2, 2026

Document
Irrigation Plans
Meeting
June 2, 2026
Body
Goleta City Council
Original file
2.4 MB
Text extracted from the city's file for reading and search. Open the original on goleta.legistar1.com. That file is the official record.

SANDPIPER GOLF CLUB HARVEY

INDEX OF SHEETS
I-1 Title Sheet
I-2 Preliminary Golf Course Irrigation
I-3 Preliminary Landscape Irrigation
986000
I-4 Irrigation Details
I-5 Irrigation Details

CITY OF GOLETA WELO

PROJECT INPOKNATIO
Project Applicant
Sandpiper Golf Trust LLC clo Cany Hwang 805-389-8100 SANDPIPER GOLF CLUB SANTA BARBARA, CALIFORNIA PRELIMINARY DESIGN [email protected]
AS TARA NOTE CRY. SIR 30 De C 280 Chestnut Ave, Westmont, IL 60559 Project
Sandpiper Goll Course Renovation
Beers Parel 079-210-059 Carry Landscape Pan No.
7925 Hollister Ave Goleta. CA 93117
Usethe information and formulas below to fit out the worksheet ard calculations on page :

Draur
Checkag
swuld) (Annual Gallons Resuled
(ETo)d.62)YETAF( LA) + ((T-ETAF) × SLAI Project e
Date 77852
Scale
REFERENCE EWAPOTRANSPIRATION (ETO) *21 (Goleta) Revisions alone is / Parting
Dioner aNd 14T ANN
230180 12,003, 180 TPS710304
Estimased Total Water Us (ETWU) Total (27A4I.H0
Impation Encess (E) Average 0.03
*verage irigetice Efficiency for orall inpation gatem shell meet of inceed 9.75 (Neel of all eliciancy ratings divided by number « hydrozones

STAE CALCULATIONS
ince ETAR da Ragule Lansscape is must be d-42 of below for risidotel and ton onside tal trel TITLE Previete Totals baser on information calcutated in Workheet abov DRB Recommended SHEET
IRRIGATION SYSTEM IMPROVEMENTS Approval 1-27-26 Site wide ETAR 3-01 + (A+C)L 1-1

PRELIMINARY GOLF COURSE IRRIGATION HARTEY

ANY PROP TO ON
POND

SANDPIPER GOLF CLUB SANTA BARBARA, CALFORNIA PRELIMINARY DESIGN Cran T.H
Checke BAH
77512
N.T.S
LEGEND

SYMBOL EQUIFMENT
RAIN BIRD 702 W/#36 NOZZLE FULL CIRCLE VIH.

RAIN BIRD 752 W/#36 NOZZLE PART CIRCLE VL.H.

RAIN BIRD 702W/#28 NOZZLE FULL CIRCLE VIH.
- RAIN BIRD 752 W/#28 NOZZLE PART CIRCLE VL.H.

RAIN BIRD 752W/#22 NOZZLE FULL CIRCLE VIH.

RAIN BIRD 752 W/N22 NOZZLE PART CIRCLE VIH.
: RAIN BIRD 752 W/#20NOZZLE FULL CIRCLE VI.H.

RAIN BIRD 752 W/#20 PART CIRCLE VI.H.

RAIN BIRD 5006 W/#4 NOZZLE GEAR DRIVEN ROTOR
RAIN BIRD 1806W/15 NOZZLE SPRAY HEAD
RAIN BIRD 1" REMOTE CONTROL VALVE
RAIN BIRD 1.5" REMO'E CONTROL VALVE
RAIN BIRD 5RC 1" QUCK COUPLER
AQUAFUSE 2" LATERA. ISOLATION VALVE W/FRV
AQUAFUSE 2ª LATERA. ISOLATION VALVE

AMERICAN FLOW CONTROL MAINLINE GATE VALVE
• CRISPIN 2" AIR RELEASE VALVE

AMERICAN FLOW CONTROL MAINLINE BLOW OFF VALVE

PREMINARY

LANDSCAPE STUB W/COMM WIRE CESIGN
2" HDPE LATERALS
SHEET
HDPE MAINLINE DRB Recommended
Approval 1-27-26 I-2

PRELIMINARY LANDSCAPE IRRIGATION HARVEY
E2
0505CC
573 3
RANGE

SANDPIPER GOLF CLUB SANTA BARBARA, CALFORNIA PRELIMINARY DESIGN

DRIP IRRIGATION

DRIP /ROTOR IRFIGATION
T.H
Checked BAN
Projoct
77522
Revision

PREMINARY
CESIGN
DRB Recommended SHEET
Approval 1-27-26
1-3

IRRIGATION DETAILS HARVEY
0 7870643
PTe 75-253485: USE HASCO POS-1286 FLAS
ПОНОК TE
ONE MITH TART NO 5.12125K.ST
BASE WONT PART NOT 50-17-150-3-9-51 HOR SO 28015 HATH

BANNERS DO HAS TACLEO

VALVEIN HEAD ROTOR (HDPE) GEAR DRIVEN ROTOR (HDPE) POP-UP SPRAY (HDPE) QUICK COUPLING VALVE (HDPE)

SANDPIPER GOLF CLUB SANTA BARBARA, CALIFORNIA PRELIMINARY DESIGN

COCATE UNDICAN VALVER
2N3-- MAX

COMERST THEST MOCK REFER
Crocked BAH
ELECTRIC CONTROL VALVE (HDPE) LATERAL ISOLATION VALVE (HDPE) LATERAL ISOLATION VALVE W/GROUND ROD (HDPE) | GATE VALVE (HDPE) Pryect # Dao 72572

NTS NTS

HAH CAREN
2'XE BRONCE MALE
TACO -56-BALL WAVE
.*.
warias tal
- HIPE MANINE FITTIN

BOT CREE TO NOTE ELVES CHE CHACH
BLOW-OFF VALVE (HDPE) AIR RELEASE VALVE (HDPE) • GREENS HEAD LAYOUT IRRIGATION 10 WEATHER STATION HEAD LAYOUT 12

NTS NTS DETAILS
SHEET
DRB Recommended
Approval 1-21-26 I-4

IRRIGATION DETAILS HARTEY

0.90.0942
LEGEND
PAN BAS A-550-C-80-22
:
- MOONETY TAPE RACH BOR 4382009

ANGERE O
•HOVE UTERAL FENG SRATUNSATEN CALL CR A-J8-0-2-3

HO DOTORUTION PRING RAN BARC

TECHNE SAGATIONS
RAN tEC
•COMMUCATION CARLE
RAIN ERC 4-332-1C-10-28
435215-30-22
RAN BAC 4-352-1C-19-22
4-35240-50-20

SMAN RICH WITHS AND BACHION

COMMUNICATION AND

DISTRIBUTION PIPING TRENCH LATERAL PIPING TRENCH WEATHER STATION CABLE SANDPIPER GOLF CLUB PRELIMINARY DESIGN 13 14 15
KAIN ES1 1605-SAVNP-ISVAN-NP POPUP SPRAY HEAD

NTS NTS NTS

RAN BR I CULE COUPLING WILY
RAN BR
- ROADWAY/CREEL CURBING 15O PESEEK-MSD
RACH C
95115$750 RICHDEE ASSEMBLY
6° HOPE IFOR COMY WIRE
HDPE
TJH
Chected BAH
RASHA Projed i
Dote 712523
SOR 11 HOOK KSTEEUTION PRINC
: Scale N.T.S
AMOVED SOR 11 *HOLATER FORES
AL SEES AND PRING TO BE RACED TA RUN ARE ONE OUTER.

ROAD CROSSING (BORE) Revisions
BANESD 122 COMLUNACATION WAS
16 NTS -...- MUMPSTATON COMANLASCATION
21T1H

GENERAL NOTES

1. ALL BASE INFORSMTION HAS BEEN NADE ANARALE BrOWSE
2 ASTER SO PROIC MANIAL AND CONSTRUCTION DE TARS FEE INSTALLATION PROCEDURES A ALL VALVE IN HELD SPOLERS TO BE RACTORY SET PER PRBSURE SPECIED ON THE REGATION LEGEND. * SURE ARE TO BE STALED VET A NASIUM ESTACE CE 1E FAM VALUE PLACAO SAMIR OR AEMOTE a CORVUNICATICA CARLE TO BE NSTALLED IN CONCUIT ACISS ALL ERIES PORCATS AND PARKRU LOTS. • BE ENS TO SET ON LE CENT SLAP WITH GETTLE FATE ARE OTINED TE UP VIV FOX

IRRIGATION

DETAILS,
DRB Recommended SHEET
Approval 1-27-26 1-5

← All documents from this meeting