Agenda Item A.4
CPMS CONSENT CALENDAR
Meeting Date: September 1, 2026
TO: Mayor and Councilmembers
SUBMITTED BY: Matthew R. Fore, General Services Director SUBJECT: Approval of Plans and Specifications , Award of Construction Contract, Budget Appropriation, and Adopt ion of Categorical Exemption for the City Hall HVAC Replacement Project and Status of the Public Facilities and Building Maintenance Reserve RECOMMENDATION:
A. Approve the Plans and Specifications for the City Hall HVAC Replacement Project; and
B. Award and authorize the City Manager to execute a Construction Contract with Frank Schipper Construction Company for the City Hall HVAC Replacement Project, in the not-to-exceed amount of $ 247,354, subject to the requirements of the contract documents; and
C. Authorize the General Services Director to approve contract change orders for the City Hall HVAC Replacement Project in an amount not-to-exceed $37,000; and D. Authorize a budget appropriation of $ 284,354 as described in the Fiscal Impacts Section; and
E. Adopt Resolution No. 2 6-__, entitled, “A Resolution of the City Council of the City of Goleta, California, finding the City Hall HVAC Replacement Project (CIP No. 913 7) Categorically Exempt from the California Environmental Quality Act (CEQA) Pursuant to State CEQA Guidelines Sections 15301 and 15302.”
BACKGROUND:
On May 21, 2024, City Council authorized the City Manager to execute Agreement No. 2024-046 with RRM Design Group (RRM). The purpose of the Agreement is to assist the City to design several improvements to City Hall, including: 1) workspaces; 2) replacement of mechanical and life safety systems; and 3) Americans with Disabilities Act improvements, including installation of an elevator.
1 Meeting Date: September 1, 2026
City Hall is equipped with a comprehensive heating, ventilation, and air conditioning (HVAC) system, which is comprised of multiple roof top units (RTUs). In May of 2024, Beyond Heating and Air, Inc. (Beyond Air), the City’s contract ed HVAC maintenance vendor, noted that two gas-fired units, RTUs 11 and 13, were failing and in need of replacement. Staff then commissioned RRM, under Agreement No. 2024 -046, to further evaluate the condition of the units. In February 2025, 3C Engineering, Inc. (3C) , a mechanical engineering subcontractor to RRM, verified and confirmed the findings and recommendations of Beyond Air, and thus recommended that the City replace the subject RTUs.
RRM and its subcontractor 3C have developed plans and specifications to replace RTUs 11 and 13 with electrically powered heat pumps and economizers. The plans have been submitted to the City ’s Building and Safety Division, and the building permit has been issued. The issued permit set of plans and specifications is included as Attachment 1.
DISCUSSION:
On September 16, 2025, City Council authorized staff to advertise a notice i nviting construction bids for the Replacement of RTU HVAC Units 11 and 13 at City Hall (Project).
The City issued a Notice Inviting Bids (NIB) on May 21, 2026, with the bidding process concluding on July 7, 2026. The Project consists of the following improvements:
Remove two gas-fired rooftop HVAC units.
Install a new 24’ glulam beneath RTU No. 11.
Install new isolation curbs and related flashing and roof repairs. Install two new electric heat pumps and economizers.
Upgrades to ductwork, electrical service, and new thermostatic control unit. Start up and balance the new equipment.
The bid solicitation was advertised on the City’s website and in the Santa Barbara Independent. It was also posted at City Hall, on PlanetBids, the City’s online bidding portal, and distributed via email through the City’s mass notification service, GovDelivery.
The bidding process was conducted entirely through the PlanetBids platform, including the posting of bid documents, bidder communications, questions and answers, and the issuance of addenda . During the bidding process, the City held two mandatory pre-bid meetings onsite to provide an opportunity for interested bidders to evaluate the site conditions.
Bid Opening and Construction Award
On July 7, 2026, the City received a total of four (4) bids, one of which was deemed non- responsive. All responsive bids were posted publicly via the PlanetBids platform. A summary of the bids is shown in Attachment 2. The lowest Base Bid was $247,354 from Frank Schipper Construction Company (FSCC). The Base Bid received is aligned with the Engineer’s Estimate for the Project. Staff reviewed the submitted bid documents for compliance with the bid specifications and recommends that City Council a ward the contract to the lowest responsible and responsive bidder, FSCC (Attachment 3).
2 Meeting Date: September 1, 2026
In addition to the construction contract amount, staff recommends approval of change order authority of $37,000, or fifteen (15) percent of the contract cost, which is standard for facility remodel projects.
Table 1: Construction Contract Cost
FSCC Construction Contract Amount
Base Contract $ 247,354
Total Construction Contract $ 247,354
Construction Contingency (Change
Order Authority) (15%) $ 37,000
Total Construction Cost $ 284,354
Adoption of Categorical Exemption
This Project is categorically exempt from CEQA as a Class 1 Exemption (State CEQA Guidelines Section s 15301 and 15302 ). The Exemption has been prepared, and no further CEQA action is required. Staff recommends that City Council adopt the attached resolution (Attachment 4).
Further City Hall HVAC Replacements
There are 23 other HVAC units that serve City Hall, which is a sealed building. As such, when HVAC units cease operating, there is no other means to circulate air throughout the building, such as opening windows , and working conditions in the building will become uncomfortable fairly quickly. This is an imp ortant consideration as this Council action recommends expenditure of approximately $284,000 to replace just two units. Moreover, according to a recent evaluation of all HVAC units at City Hall by Beyond Air (Attachment 5), 10 additional units will likely need to be replaced immediately or in the next one to three years due to current degradation and/or age, where the condition can change from fair to poor quite rapidly.
Moving forward, General Services staff are working on a plan to systematically consolidate multiple units that serve small and inefficient climate zones into single, larger units. As with RTUs 11 and 13, new structural supports accommodate heavier modern units and new ducting to connect discrete climate zones will likely be needed. This plan assumes no changes to the footprint and layout of City Hall (e.g., no new offices) with the exception of the installation of a new elevator. It is financially infeasible to consolidate all 23 units at once. Therefore, the consolidation plan will seek to proactively replace/consolidate a few units at time as funding allows. The new, consolidated units will use less energy and will result in lower maintenance costs ; saving s that should be reinvested toward consolidation of additional units.
GOLETA STRATEGIC PLAN:
City-Wide Initiative: 5 Strengthen Infrastructure
Strategic Goal : 5.4 Protect and maintain City -owned facilities and critical operational assets
3 Meeting Date: September 1, 2026
FISCAL IMPACT:
With the construction contingency, the total construction cost is $284,354 (Table 1) and the Project is completely unfunded. Therefore, this Council action requests approval of a budget appropriation transfer of $284,354 from the Public Facilities and Building Maintenance Reserve (Building Reserve) to Capital Improvement Program Project No. 9137 – City Hall Elevator, ADA, and Tenant Improvements Project as shown in the table below. The available reserve balance is currently estimated to be $800,076.
Table 2: Use of Reserves
General Ledger
Account
Available Budget Transfer In/Out Ending Balance
Building Reserve $800,076 ($284,354) $515,722
101-90-9137-57070 $0 $284,354 $284,354
Status of Public Facilities and Building Maintenance Reserve Should Council approve the staff recommendation to fund the replacement of RTUs 11 and 13 from reserves, then approximately $515,000 in available Building Reserve funding will remain. As stated in the December 9, 2025 memorandum to the Council Finance and Audit Committee, which was also provided to the full Council on May 19, 2026, as part of the FY 2026/27 Budget (Mid-Cycle) Workshop, approximately $2.675 million annually is needed to ensure that City -owned facilities remain safe, functional, and compliant with regulatory standards. Staff recommends that Council maintain a minimum of $1 million in Building Reserve funding to address unknown yet credible risks, such as catastrophic building system failures, escalating construction costs, and cost overruns resulting from unknown conditions in older buildings.
In the near-term, remaining Building Reserve funding is earmarked for the items shown in Table 3 below; all of which are necessary to either prevent further degradation of existing City -owned facilities ( Goleta Community Center Skylight Replacement ), to complete grant-funded projects (Goleta Community Center Americans with Disabilities Act Project), or to open and operate new City-owned facilities (Goleta Train Station). 4 Meeting Date: September 1, 2026
Table 3: Planned Use of Reserves
Current Reserve
Balance $800,076
Project
Use of
Reserves Facility CIP No.
RTU 11 and 13 Replacement $284,354 City Hall 9137
Lead and Asbestos
Management $37,000
Goleta
Community
Center 9121
Skylight Replacement $338,000
Goleta
Community
Center 9127
Access Control Hardware $25,000
Goleta Train
Station (Amtrak) 9079
Subtotal - Use of Reserves $684,354
Remaining Reserve Balance $116,392*
*Does not include residual FY 2025-26 funding in Program 1810 to be transferred to the Public Facilities and Building Maintenance Reserve following year-end close.
Note that any use of reserves of any amount must be approved by Council. Therefore, staff will return to Council at future dates to appropriate reserves toward the other projects besides the RTU 11 and 13 Replacement, as shown in Table 3. Should depleted Building Reserves be insufficient to cover the cost of an urgent repair or capital replacement, any additional funding would likely have to come from General Fund Contingency Reserves or Unassigned Fund Balance for one-time use.
ALTERNATIVES:
Council may choose not to approve the award of bid , including rejecting all bids and directing staff to re-bid the project. However, doing so would jeopardize the replacement of the two failing RTUs and impact the ability to appropriately heat and cool portions of City Hall covered by these new units.
LEGAL REVIEW BY: Isaac Rosen, City Attorney
APPROVED BY: Robert Nisbet, City Manager
ATTACHMENTS:
1. Permit Set of Plans and Specifications
2. Summary of Bids Received
5 Meeting Date: September 1, 2026
3. Public Works Construction Contract with FSCC
4. Resolution No. 2 6-__ entitled, “A Resolution of the City Council of the City of Goleta, California, Finding the City Hall HVAC Replacement Project (CIP 9137) Categorically Exempt from the California Environmental Quality Act ( CEQA) Pursuant to State CEQA Guidelines Sections 15301 and 15302.”
5. Condition of HVAC Units at City Hall
6 ATTACHMENT 1
Permit Set of Plans and Specifications
7 PROJECT SITE
HOLLISTER AVE.
LOS CARNEROS RD.
LOS CARNEROS W
AY
CREM
ONA DR.
1 NORTH ARROW
LEVEL
DESIGNATION
GRID REFERENCE
SECTION REFERENCE
VIEW SHEET LOCATION
REFERENCE SHEET LOCATION
VIEW NUMBER
VIEW TITLE
LEVEL
ELEVATION
BUILDING LEVELS
DETAIL REFERENCE
Name
0' - 0"
A101
1 SIM
A101
1 SIM
BUILDING ELEVATION
A101
1 SIM
A101
1 2
3 4
INTERIOR ELEVATIONS
ROOM TAG
DOOR TAG
WINDOW TAG
STOREFRONT TAG
WALL TAG
CENTERLINEREVISION TAG
S
01 101
View Name
SCALE: 1/8" = 1'-0"A-101 A-202
20 0
?P1
MATERIAL TAG
Room name
RM #
GENERAL NOTES
USE OF PLANS: THESE PLANS ARE THE PROPERTY OF RRM AND MAY NOT BE USED WITHOUT THE EXPRESS, WRITTEN CONSENT.
THESE NOTES APPLY TO ALL PORTIONS, PHASES AND SUBCONTRACTORS OF THIS PROJECT.
APPLICABLE CODES ARE STANDARDS:
• 2022 CALIFORNIA BUILDING CODE AND ITS APPENDICES AND STANDARDS. • 2022 CALIFORNIA PLUMBING CODE AND ITS APPENDICES AND STANDARDS. • 2022 CALIFORNIA MECHANICAL CODE AND ITS APPENDICES AND STANDARDS.
• 2022 CALIFORNIA FIRE CODE AND ITS APPENDICES AND STANDARDS. • 2022 CALIFORNIA ELECTORAL CODE AND ITS APPENDICES AND STANDARDS.
• 2022 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS. • 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE AND ITS APPENDICES AND STANDARDS.
• CURRENT CITY OF GOLETA MUNICIPAL CODE.
1. ALL WORK DESCRIBED IN THE DRAWINGS SHALL BE VERIFIED FOR DIMENSION, GRADE, EXTENT AND COMPATIBILITY WITH EXISTING SITE CONDITIONS. ANY
DISCREPANCIES AND UNEXPECTED CONDITIONS THAT AFFECT OR CHANGE
THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY. DO NOT PROCEED WITH THE
WORK IN THE AREA OF DISCREPANCIES UNTIL ALL SUCH DISCREPANCIES ARE RESOLVED. IF THE CONTRACTOR CHOOSES TO DO, HE/SHE SHALL BE PRECEDING AT HIS/HER OWN RISK.
2. DIMENSIONS SHOWN SHALL TAKE PRECEDENCE OVER DRAWING SCALE OR PROPORTION. LARGER SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. ALL DIMENSIONS ARE ROUGH AND TO THE FACE OF FRAMING.
3. CONTRACTOR IS TO BE RESPONSIBLE FOR BEING FAMILIAR WITH THESE DOCUMENTS INCLUDING ALL CONTRACT REQUIREMENTS.
4. CONTRACTOR TO REVIEW CALIFORNIA GREEN BUILDING CODE
REQUIREMENTS FOR CONTRACTOR REQUIREMENTS.
5. TEMPORARY FACILITIES: CONTRACTOR SHALL PAY FOR, PROVIDE AND
MAINTAIN TEMPORARY FACILITIES FOR PROJECT PROTECTION AND
CONSTRUCTION, AND AS REQUIRED BY LOCAL REGULATION AND THESE DOCUMENTS. SUCH FACILITIES INCLUDE, BUT ARE NOT LIMITED TO: TOILETS,
LIGHTS, HEATERS, POWER, GAS FANS, WATER, PHONES, FENCES, SIGNS, SHEDS, ETC. REMOVE FROM SITE UPON COMPLETION OF WORK. OBTAIN
BUILDING OFFICIAL OR FIRE MARTIAL APPROVAL PRIOR TO USE OF ANY TEMPORARY HEATING DEVICE.
6. CONTRACTOR SHALL PROVIDE FOR PROTECTION AND SAFETY: RESPONSIBLE
FOR ALL ITEMS (SIGNS, LIGHTS, FENCES, BRACING, ANCHOR-AGE, FIRE- EXTINGUISHERS, ETC.) NECESSARY FOR THE PROTECTION OF THE PUBLIC,
WORKERS, MATERIALS, CONSTRUCTION AND PROPERTY PER LOCAL, STATE,
AND FEDERAL REQUIREMENTS (INCLUDING EARTHQUAKES, FIRES, SPILLS, ACCIDENTS, EROSION, MUD, DUST ETC.).
7. A SEPARATE OFFICER, ACCESS EASEMENT/AGREEMENT, AND/OR RECIPROCAL
ACCESS EASEMENT/AGREEMENT MAY BE REQUIRED TO ENSURE THAT THE
PROPOSED PRIVATE ACCESS ROADWAY WILL REMAIN OPEN TO THROUGH TRAFFIC AND EMERGENCY VEHICLES PRIOR TO FINAL OF BUILDING PERMIT.
8. SHOP WELDS MUST BE PERFORMED BY A LICENSED FABRICATOR'S SHOP.
9. OSHA PERMITS REQUIRED FOR VERTICAL CUTS 5' OR GREATER.
C 3 9 6 2 3
09-30-27
RENEWAL DATE
A
TCETIHCRADESNECIL
S
TAT
E OF CALIFORNI
CAMERON M. WIRE
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISION DATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
Autodesk Docs://X1806-03-PS24-Goleta City Hall TI/1806-06_Goleta_City_Hall_HVAC REPLACEMENT.rvt 11/12/2025 3:02:06 PM
ISSUE FOR BID
TITLE SHEET
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
1806-03-PS24
G-001
NOVEMBER 18, 2025
CD
CW CW
GOLETA CITY HALL
HVAC UNIT REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
PROJECT DIRECTORY PROJECT INFORMATION
PROJECT SCOPE
1. REMOVAL OF TWO (2) EXISTING HVAC ROOFTOP HVAC UNITS,
DEMOLITION OF SUPPORT CURBS, AND PARTIAL DEMOLITION OF
DUCTWORK.
2. INSTALLATION OF TWO (2) NEW ROOFTOP HVAC UNITS AND
CONSTRUCTION OF NEW SUPPORT CURBS, LIMITED ROOFING AND
FLASHING, AND NEW DUCTWORK.
3. CONSTRUCTION OF NEW STRUCTURAL FRAMING AND CONNECTIONS.
4. ALL OTHER WORK INDICATED IN THE CONTRACT DOCUMENTS.
GENERAL
G-001 TITLE SHEET
ARCHITECTURAL
A-101 OVERALL PLANS
A-111 SECOND FLOOR PARTIAL RCP
A-121 PARTIAL ROOF PLANS - DEMO & NEW
STRUCTURAL
S-101 SHEET INDEX, ABBREVIATIONS & SYMBOLS
S-102 GENERAL NOTES
S-201 ROOF FRAMING PLAN
S-301 ROOF FRAMING DETAILS
MECHANICAL
M-000 GENERAL
M-001 SCHEDULES & DETAILS
M-121 PARTIAL ROOF PLANS
ENERGY COMPLIANCE
EC-000 ENERGY COMPLIANCE DOCUMENTATION
ELECTRICAL
E-001 GENERAL NOTES. LEGEND, AND ABBREVIATIONS
E-011 SINGLE LINE DIAGRAM
E-101 ELECTRICAL ROOF PLAN
E-201 ELECTRICAL FIRST FLOOR PLAN
E-202 ELECTRICAL SECOND FLOOR PLAN
SHEET COUNT: 17
SHEET INDEX
OCCUPANCY:
CONSTRUCTION TYPE:
FIRE SPRINKLERED:
BUILDING HEIGHT:
NUMBER OF STORIES:
BUILDING AREA:
B
DESCRIPTION
V-B
NO
29' - 0"
2 37,803 SF
VICINITY MAP
A/C AIR CONDITIONING
ABV ABOVE
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISH FLOOR
AL ALUMINUM
ALT ALTERNATE
ARCH ARCHITECT(URAL)
BD BOARD
BDRM BEDROOM
BET BETWEEN
BIT BITUMINOUS
BLDG BUILDNG
BLKG BLOCKING
BLW BELOW
BM BEAM
BOT BOTTOM
BUR BUILT UP ROOF
CB CATCH BASIN
CBC CALIFORNIA BUILDING CODE
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
DBL DOUBLE
DF DRINKING FOUNTAIN
DIA DIAMETER, DIAPHRAGM
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWN SPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
(E) EXISTING
E EAST
EA EACH
EJ EXPANSION JOINT
EL,
ELEV
ELEVATION
ELEC ELECTRIC
ENCL ENCLOSURE
EQ EQUAL
EQUIP EQUIPMENT
EXH EXHAUST
EXP EXPANSION
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FAU FORCED AIR UNIT
FAWP FLUID APPLIED WATERPROOFING
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FLUOR FLOURESCENT
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOIC FURNISHED BY OWNER INSTALLED BY
CONTRACTOR
SYMBOLS
ABBREVIATIONS
FOM FACE OF MASONRY
FOS FACE OF STUD
FRP FIBERGLASS REINFORCED PANELS
FT FOOT OR FEET
FTG FOOTING
GA GAUGE, GAGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GT GROUT
GWB GYPSUM BOARD
GYP GYPSUM
HB HOSE BIBB
HC HOLLOW CORE
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HVAC HEATING, VENTILATION, A/C
ID INSIDE DIAMETER
IIC IMPACT INSULATION CLASS
IN INCH
INCAND INCANDESCENT
INSUL INSULATION, INSULATED
INT INTERIOR
JC JANITORS CLOSET
JT JOINT
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LEED LEADERSHIP IN ENERGY AND
ENVIRONMENTAL DESIGN
LF LINEAR FEET
LIN LINEN CLOSET
LINO LINOLEUM
LT(G) LIGHT(ING)
LVL LAMINATED VENEER LUMBER
LVT LUXURY VINYL TILE
LW LIGHTWEIGHT
MAX MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MEMB MEMBRANE
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O.P. OVERFLOW PIPE
OC ON CENTER
OD OVERFLOW DRAIN
OFF OFFICE
OH OPPOSITE HAND
OPG OPENING
OPP OPPOSITE
(P) PROPOSED
PERM PERIMETER
PERP PERPENDICULAR
PG PAINT GRADE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PP POWER POLE
PR PAIR
PRTN PARTITION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT PRESSURE TREATED
PTD PAINTED
PV PHOTO VOLTAIC
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QTY QUANTITY
R RADIUS, RISER
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR
REINF REINFORCED
REQD REQUIRED
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT (MECH)
S SOUTH
SAFB SOUND ATTENUATION FIBER BATT
SAWP SELF ADHEREING WATERPROOFING
SC SCUPPER/SOLID CORE
SCHED SCHEDULE
SEAL SEALANT
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SM SHEET METAL
SPEC SPECIFICATION
SQ SQURE
SS SOLID SURFACE
SSTL STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
T TREAD
T&G TONGUE & GROOVE
TB TACKBOARD
TEL TELEPHONE
TEMP TEMPERED
TER TERRAZZO
THK THICK
THR THRESHOLD
TJI TRUSS JOIST I-JOIST
TO TOP OF
TOS TOP OF SLAB
TOW TOP OF WALL
TRANS TRANSFORMER
TV TELEVISION
TYP TYPICAL
UFAS UNIFORM FEDERAL ACCESSIBILITY
STANDARDS
UG UNDERGROUND
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UV ULTRAVIOLET
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT TERMINATION PIPE
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/D WASHER DRYER
W/O WITHOUT
WC WATERCLOSET
WD WOOD
WDW WINDOW
WH WATER HEATER
WI WROUGHT IRON
WIN WINDOW
WP WATERPROOF(ING)
WR WEATHER RESISTIVE
WRB WATER RESISTIVE BARRIER
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
YD YARD
ADDRESS:
CONTACT:
EMAIL:
CITY OF GOLETA
130 CREMONA DRIVE, SUITE B
GOLETA CA 93117
P:(805) 690-5128
OWNER
PATRICK ZUROSKE
[email protected]
ADDRESS:
CONTACT:
EMAIL:
RRM DESIGN GROUP
3765 S. HIGUERA ST. #102
SAN LUIS OBISPO, CA 93401
P:(805) 543-1794
ARCHITECT
CHARLES DELLINGER
[email protected]
ADDRESS:
CONTACT:
EMAIL:
RRM DESIGN GROUP
3765 S. HIGUERA ST. 102
SAN LUIS OBISPO, CA 93401
P:(805) 543-1794
STRUCTURAL
ENGINEER
MICHAEL DOREMUS
[email protected]
ADDRESS:
CONTACT:
EMAIL:
3C ENGINEERING
1500 PALM STREET
SAN LUIS OBISPO, CA 93401
P:(805) 540-3363
MECHANICAL
ENGINEER
DENVER STANGER
[email protected]
ADDRESS:
CONTACT:
EMAIL:
THOMA ELECTRIC, INC.
3562 EMPLEO STREET, SUITE C
SAN LUIS OBISPO, CA 93401
P:(805) 543-3850
ELECTRICAL
ENGINEER
CHRIS JOSE
[email protected]
DEFFERED SUBMITTALS
SEPARATE SUBMITTALS
1. FIRE ALARM SYSTEM
1. NONE.
SUPPORTING DOCUMENTS
PREPARED BY:
DATE PREPARED:
JOB NUMBER:
RRM DESIGN GROUP
STRUCTURAL CALCULATIONS
JULY 15, 2025
1806-03-PS24
PREPARED BY:
DATE PREPARED:
JOB NUMBER:
3C ENGINEERING
ENERGY COMPLIANCE
MAY 9, 2025
1806-03-PS24
8 PF
REF.
REF.
PF
REF.
A-121
2 ROOF ACCESS
A-111
1 STAIR
STAIR
STAIR
STAIR
STAIR
MAIN ENTRY /
STAIR
ROOF ACCESS
STAIR
STAIR
MAIN ENTRY /
STAIR
AREA OF WORK, SEE STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS.
C 3 9 6 2 3
09-30-27
RENEWAL DATE
A
TCETIHCRADESNECIL
S
TAT
E OF CALIFORNI
CAMERON M. WIRE
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISION DATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
Autodesk Docs://X1806-03-PS24-Goleta City Hall TI/1806-06_Goleta_City_Hall_HVAC REPLACEMENT.rvt 5/7/2026 11:10:33 AM
ISSUE FOR BID
OVERALL PLANS
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
1806-03-PS24
A-101
MAY 21, 2026
CD
CW CW
SCALE: 1/16" = 1'-0"A-101
ROOF PLAN3
SCALE: 1/16" = 1'-0"A-101
SECOND FLOOR REFLECTED CEILING PLAN4
SCALE: 1/16" = 1'-0"A-101
GROUND FLOOR PLAN (FOR REFERENCE ONLY)1
SCALE: 1/16" = 1'-0"A-101
SECOND FLOOR PLAN2
LEGEND
9 STAIR
TYP.
02 40 13.A5
TYP.
02 40 13.A2
TYP.
02 40 13.A3
02 41 19.A1
02 41 19.A1
NOTE:
THE INSTALLATION OF THE NEW GLU-LAM BEAM ON THE SECOND FLOOR MAY REQUIRE SPECIAL MEANS AND METHODS DUE TO LIMITED ACCESS. CONTRACTORS SHALL
ACCOUNT FOR ALL NECESSARY EQUIPMENT, LABOR, AND COORDINATION EFFORTS NECESSARY TO TRANSPORT AND INSTALL THE BEAM IN ITS FINAL LOCATION. THIS MAY
INCLUDE EXPLORATION OF ALTERNATIVE ACCESS ROUTES AND/OR PARTIAL DISASSEMBLY OF EXISTING ELEMENTS. CONTRACTORS SHALL COORDINATE THIS PROCESS WITH THE CITY OF GOLETA.
EXISTING GYPSUM BOARD CEILING
EXISTING ACOUSTICAL TILE CEILING
AREA OF WORK, SEE STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS.
GENERAL LOCATION OF MECHANICAL UNIT ABOVE
C 3 9 6 2 3
09-30-27
RENEWAL DATE
A
TCETIHCRADESNECIL
S
TAT
E OF CALIFORNI
CAMERON M. WIRE
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISION DATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
Autodesk Docs://X1806-03-PS24-Goleta City Hall TI/1806-06_Goleta_City_Hall_HVAC REPLACEMENT.rvt 5/7/2026 10:55:05 AM
ISSUE FOR BID
SECOND FLOOR PARTIAL RCP
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
1806-03-PS24
A-111
NOVEMBER 18, 2025
CD
CW CW
1. SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION.
2. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION.
3. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION.
RCP GENERAL NOTES
02 40 13.A2 EXISTING LIGHT FIXTURE
02 40 13.A3 EXISTING MECHANICAL REGISTER
02 40 13.A5 EXISTING SKYLIGHT
02 41 19.A1 REMOVE AND PROTECT EXISTING CEILING GRID SYSTEM AND TILES, LIGHT FIXTURES, REGISTERS AND OTHER COMPONENTS.
REPAIR OR REPLACE ANY DAMAGED CEILING COMPONENTS OR
FIXTURES.
LEGEND
SCALE: 1/4" = 1'-0"A-101 A-111
SECOND FLOOR PARTIAL REFLECTED CEILING PLAN1
KEYNOTES
10 AREA OF WORK, SEE STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS.
23 00 00.A1
23 00 00.A1
07 53 00.A1
07 62 00.A2
07 53 00.A1
07 62 00.A2
23 00 00.A2
23 00 00.A2
02 40 13.A6
TYP.
02 40 13.A9
TYP.
02 40 13.A7
02 40 13.A8
02 41 19.A2
TYP.
02 40 13.A5
02 41 19.A2
TYP.
02 40 13.A10
02 41 19.A3
02 41 19.A3
TYP.
02 40 13.A11
C 3 9 6 2 3
09-30-27
RENEWAL DATE
A
TCETIHCRADESNECIL
S
TAT
E OF CALIFORNI
CAMERON M. WIRE
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISION DATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
Autodesk Docs://X1806-03-PS24-Goleta City Hall TI/1806-06_Goleta_City_Hall_HVAC REPLACEMENT.rvt 5/7/2026 10:51:52 AM
ISSUE FOR BID
PARTIAL ROOF PLANS - DEMO &
NEW
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
1806-03-PS24
A-121
NOVEMBER 18, 2025
CD
CW CW
1. SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION.
2. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION.
3. SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION.
4. ALL ROOFING MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
5. ROOF COVERINGS AND UNDERLAYMENT SHALL BE APPLIED IN ACCORDANCE WITH (2022 CBC 1507.1), AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
6. ALL WORK ON THE ROOF, INCLUDING PENETRATIONS FOR MECHANICAL
AND/OR PLUMBING, SHALL BE PATCHED AND REPARIED WITH A MATCHING ROOF ASSEMBLY TO EXISTING. WORK SHALL ADHERE TO THE
REQUIREMENTS OF THE WARRANTY OF THE EXISTING ROOF SYSTEM TO MAINTAIN THE EXISTING WARRANTY.
7. CONTRACTOR TO COORDINATE WITH EXISTING ROOF MANUFACTURER TO
SCHEDULE INSPECTIONS THAT MAY BE REQUIRED TO MAINTAIN THE EXISTING ROOF WARRANTY.
ROOF PLAN GENERAL NOTES
LEGEND
02 40 13.A5 EXISTING SKYLIGHT
02 40 13.A6 EXISTING ROOF ACCESS LADDER
02 40 13.A7 EXISTING ROOF SCREEN
02 40 13.A8 EXISTING ACCESS GATE
02 40 13.A9 EXISTING ROOF WALKING PADS
02 40 13.A10 EXISTING MECHANICAL UNIT TO REMAIN
02 40 13.A11 EXISTING MEMBRANE ROOFING
02 41 19.A2 REMOVE EXISTING MECHANICAL UNIT
02 41 19.A3 REMOVE EXISTING MECHANICAL UNIT SUPPORT CURBS 07 53 00.A1 SINGLE-PLY MEMBRANE ROOFING
07 62 00.A2 ALUMINUM FLASHING
23 00 00.A1 NEW MECHANICAL UNIT, SEE MECHANICAL DRAWINGS. 23 00 00.A2 NEW MECHANICAL UNIT SUPPORT CURBS, SEE MECHANICAL DRAWINGS.
KEYNOTES
SCALE: 1/4" = 1'-0"A-101 A-121
PARTIAL ROOF PLAN - NEW2
SCALE: 1/4" = 1'-0"A-121
PARTIAL ROOF PLAN - DEMO1
11 DETAIL REFERENCE BUBBLE WITH LEADER
DRAG STRUT CONNECTION
MOMENT CONNECTION
WIDE FLANGE STEEL COLUMN
NUMBER OF EVENLY SPACED
STEEL HSS TUBE COLUMN
WELDED WIRE FABRIC
ELEVATION OF WALL OR FRAME
SLOPED SURFACE
INDICATES SAND OR GROUT
INDICATES GRAVEL
EARTH LAYER
NORTH ARROW
SLOPE
FULL HEIGHT SECTION INDICATOR
DETAIL REFERENCE BUBBLE
BEAM CAMBER AT MID-SPAN
SPECIAL STUD SPACING SEE TYPICAL
DOUBLE ANGLE BRACE
STEEL IN CROSS SECTION
INDICATES BEARING CMU WALL BELOW
INDICATES BEARING CMU WALL ABOVE
INDICATES NON-BEARING CMU WALL BELOW
INDICATES NON-BEARING CMU WALL ABOVE
INDICATES EXISTING BEARING CMU WALL
INDICATES BEARING CONCRETE WALL BELOW
INDICATES EXISTING NON-BEARING CMU WALL
INDICATES NON-BEARING CONCRETE WALL BELOW
INDICATES BEARING CONCRETE WALL ABOVE
INDICATES NON-BEARING CONCRETE WALL ABOVE
INDICATES EXISTING NON-BEARING CONCRETE WALL
SHEET INDEX SYMBOLS
FULL HEIGHT STIFFENER CONNECTION
STEPPED FOOTING
TOP/BOTTOM OF ELEVATIONS
TOP OF STEEL ± ELEVATION
MEMBER SPLICE
STEEL HSS OR PIPE COLUMN
INDICATES FOOTING TYPE PER SCHEDULE
(WWF LAYER)
STEPPED SURFACE; FLOOR DEPRESSION
ANGLE BRACE
SHEAR STUDS
STEEL DETAILS
C1
S-101SHEET INDEX, ABBREVIATIONS & SYMBOLS
S-102GENERAL NOTES
S-201ROOF FRAMING PLAN
S-301ROOF FRAMING DETAILS
INDICATES BEARING WOOD WALL BELOW
INDICATES BEARING WOOD WALL ABOVE
INDICATES PLYWOOD SIDE FOR SHEARWALL
INDICATES NON-BEARING WOOD WALL BELOW
INDICATES NON-BEARING WOOD WALL ABOVE
INDICATES EXISTING BEARING WOOD WALL
INDICATES EXISTING NON-BEARING WOOD WALL
INDICATES EXISTING BEARING CONCRETE WALL
-
S-
BOT OF
EL = (-X'-X")
BOTTOM STEPPED FOOTING
WOOD POST
X
XX'-X"
INDICATES SHEAR WALL TYPE AND LENGTH, PER SHEAR WALL SCHEDULE INDICATES HEADER @ OPENING PER HEADER SCHEDULE
INDICATES SPAN AND DIRECTION OF PREFABRICATED ROOF TRUSS (BY OTHERS)
INDICATES SPAN AND DIRECTION OF ROOF RAFTER OR FLOOR JOIST WITH WEB STIFFENERXX
INDICATES BEARING WALL
SHADED AREA INDICATES CALIFORNIA FRAMING
SHADED AREA INDICATES FOOTPRINT OF FLOOR ABOVE
INDICATES SPAN AND DIRECTION OF ROOF RAFTER OR FLOOR JOISTXX
INDICATES EXTENTS OF FRAMING OR OTHER STRUCTURAL ELEMENT
INDICATES TOP PLATE SPLICE NAILING PER SCHEDULE
INDICATES PAD FOOTING TYPE PER SCHEDULE
1xINDICATES SHEAR WALL STRAP / HOLDOWN TYPE PER SCHEDULE
WALL TYPES
ABBREVIATIONS
F1
X
KSI
FOOTING
HEIGHT
INCLUDE
INFORMATION
INCL
INFO
JST
INSP
INT
JOINT
JOIST
KIPS
ID
I-JST
IN
IF
HT
INCH
GRADE BEAM
HORIZONTAL
GROUND
HIGH POINT
H or HORIZ
HP
GB
GRND
FACE OF MASONARY
FOOT; FEET
FOM
FJ
ELEVATOR
EDGE NAIL
EMBEDMENT
EXISTING
EXTERIOR
EACH WAY
EQUAL OR EQUIVALENT
EXIST or (E)
FDN
EW
ELEV
ES
EQUIP
EQ
STRUCTURAL STEEL SHAPES
WT, ST, MT
MC
AMERICAN STD CHANNEL SHAPE
MISC CHANNEL SHAPE
THRU
THK
T & G
T & B
TOC
TO
TB
STRUCT
STIFF
STL
SW
THREADED
TEMPERATURE; TEMPORARY
STIFFENERS
STEEL
STANDARD
AMERICAN WOOD PRESERVERS ASSOCIATION
CONSTRUCTION JOINT; CONTROL JOINT
COMPLETE JOINT PENETRATION WELD
DIAPHRAGM
DRAWING
DIAMETER
DOWEL
EACH FACE
ELEVATION
EF
EL
DWL
EACH
DIM
DIAG
CONTRACTOR
CONSTRUCTION
CUBIC FOOT
PENNY (NAIL OR BAR DIA)
CONNECTION; CONNECT
CONCRETE
DBL
CU FT
d
DETAIL
CONSTR
CONTR
CJP
CONT
CONN
CONC
BEARING
CENTER OF GRAVITY
CENTER TO CENTER
CANTILEVER
CAMBER
COMPRESSION
COLUMN
CONCRETE MASONRY UNIT
CLR
COMP
CMU
CJ
CL
BTWN
BLOCKING
BN
BM
BLOCK
BLDG
ASTM
AITC
SPECS
SN
SPCG
SHTG
SEP
PSI
PVMT
#
PSL
SHEATHING
SHEET
SECTION
PARTIAL JOINT PENETRATION WELD
REINFORCE; REINFORCING
PARALLEL STRAND LUMBER
PAVEMENT
REFERENCE
REQUIRED
PLATE WASHER
PREFABRICATED
PLYWOOD
ORIGINAL
OD
PI
L
PC
OPP
NO or #
OC
MIN
(N)
MFR
PONDS PER LINEAL FOOT
PROPERTY LINE
PERPENDICULAR
ADDL
APPROXIMATE
ARCHITECTURAL; ARCHITECT
ADJACENT
ARCH
APA
AESS
ALUM
ALT
ADJ
ANCHOR BOLT
AMERICAN CONCRETE INSTITUTE
AB
LINEAL FOOT
POUND(S)
LOW POINT
LEVEL OR LAMINATED VENEER LUMBER
MACHINE BOLT
MASONRY
MATERIAL
LINEAL; LINEAR
LONG SLOTTED HOLES
LONG LEG VERTICAL
LF
LT WT
MAS
MAX
MATL
LVL
LLV
LLH
AMERICAN PLYWOOD ASSOCIATION)
KIPS PER SQUARE INCH
FTG
HORIZONTALLY SLOTTED HOLESHSH
INSIDE DIAMETER
INSIDE FACE
I-JOIST
INSPECTION
INTERIOR
JT
K
GALVANIZED
HANGER
GLUED LAMINATED BEAM
HGR
GR
GLB
GALV
GA
GRADE
GAUGE
FACE OF CONCRETE
FIELD NAIL
FLANGE
FLOOR JOIST
FRAMING
FACE OF WALL
FACE OF STUD
FT
FRMG
FOW
FOS
FN
FOC
FLG
FLR
FIN
FLOOR
FINISH
ENGINEER
EACH SIDE
EQUIPMENT
FOUNDATION
EXT
ENGR
EN
EMBED
TYPICAL TYP
PIPE-X
PIPE-XX
HSS
C
PIPE
L
W
WWF
WD
WP
W/O
W/
UNO
VSH
VERT
UT
DBL EXTRA STRONG PIPE SHAPE
EXTRA STRONG PIPE SHAPE
HOLLOW STRUCTURAL SECTION
STANDARD PIPE SHAPE
STRUCT TEE SHAPE
ANGLE SHAPE
W SHAPE
WELDED WIRE FABRIC
WORK POINT; WATERPROOF
WOOD
WITHOUT
WITH
VERTICAL SLOTTED HOLES
ULTRA-SONIC TEST
UNLESS NOTED OTHERWISE
VERTICAL
TOP or T
THR
TOW
TOS
TOF
TEMP
STIRR
SYM
SS
SSL
STGR
STD
SQ
TOP OF STEEL/TOP OF SLAB
TOP OF CURB; TOP OF CONCRETE
THICKNESS/THICK
THROUGH
TOP OF WALL
TOP
TOP OF FOOTING
TONGUE & GROOVE
TOP AND BOTTOM
TOP OF
TIE BEAM
SYMMETRICAL
SHEAR WALL
STRUCTURAL
STIRRUP
SHORT SLOTTED HOLES
STAINLESS STEEL
STAGGER
SQUARE
AWPA
AMERICAN SOCIETY FOR TESTING MATERIALS
AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
DOUGLAS FIR/LARCHDF
DIMENSION
DIAGONAL
ELECTRICAL
EXPANSION JOINT
DWG
ELEC
EJ
EA
DIAPH
DNDOWN
CENTER
DEPARTMENT
DOUBLE
COUNTERSINK; COUNTERSUNK
CONTINUE; CONTINUOUS
CTR
DEPT
DET
CTSK
BETWEEN
CLEARANCE; CLEAR
CENTER LINE
CAST-IN-PLACE
COL
CIP
BRG
CAM OR C
CANT
CG
CC
BUILDING
BOUNDARY NAIL
BOTTOM
AMERICAN WELDING SOCIETY
BLK
BOT OR B
BRC
BLKG
BRACE
BEAM
AWS
SOG
SIM
SCHED
RF
Ø
SHT
SECT
REINF
REF
REQD
PREFAB
PLY
PT
PW
PSF
PJP
PROP
SPECIFICATIONS
SLAB ON GRADE
SHEAR NAIL
SPACING
SIMILAR
ROUND; DIAMETER
ROOF
SEPARATION
SCHEDULE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
POUND; NUMBER
PRESSURE TREATED
PROPERTY
MECHANICAL
NEW
NORTH
ON CENTER
NOT TO SCALE
NUMBER
OPENING
OPPOSITE
OUTSIDE FACE
ORIENTED STRAND BOARD
OPPOSITE HAND
MINIMUM; MINUTE
OUTSIDE DIAMETER
MISCELLANEOUS
MANUFACTURER
PARA OR //
PLF
PL
PLCS
P OR PL.
PERP
OPNG
OSB
ORIG
OH
OF
NTS
MECH
MISC
N
PLYWOOD INDEX
PRECAST; PIECE
PLATE
PLACES
PARALLEL
ARCHITECTURAL EXPOSED STRUCTURAL STEEL
AMERICAN NATIONAL STANDARDS INSTITUTE
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ADDITIONAL
ANCHOR
ALTERNATE
ALUMINUM
APPROVED
ENGINEERED WOOD ASSOCIATION (FORMERLY THE
ANCH
APPROX
APPVD
ANSI
AISC
ACI
LIGHTWEIGHT
MAXIMUM
LONG LEG HORIZONTAL
MB
LP
LSH
LIN
LB(S) OR #
DIA OR Ø
LAMINATED STRAND LUMBERLSL
ABOVE AND BELOWA & B
RRROOF RAFTER
POST ABOVE PA
FLOOR TIE ABOVEFTA
KING POST KP
WOWHERE OCCURS
ABOVE ABV
KING STUD KS
TSTRIMMER STUD
DODO OVER
HEADER HDR
BELBELOW
SHEET INDEX,
ABBREVIATIONS & SYMBOLS
S-101
ISSUE FOR BID
N:\1800\1806-03-ps24-goleta-city-hall-ti\structural\ConDocs\sheet-files\_goletahall-ti\1806-03-PS24 -S101.dwg, S101, May 08, 2026 2:11pm, jdlong
PROJECT MANAGER
DRAWN BY
PROJECT NUMBER
CHECKED BY
SHEET
MAY 13, 2026
1806-03-PS24
DATE
NO.REVISIONDATE
CONSULTANT
GOLETA CITY HALL
130 CREMONA DRIVE, GOLETA CA 93117
RRM DESIGN GROUP COPYRIGHT 2026.
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
AGENCY
C. PRESSLER
M. DOREMUS
M. DOREMUS
12 GENERAL NOTES
S-102
ISSUE FOR BID
N:\1800\1806-03-ps24-goleta-city-hall-ti\structural\ConDocs\sheet-files\_goletahall-ti\1806-03-PS24 -S102.dwg, S102, May 08, 2026 2:11pm, jdlong
PROJECT MANAGER
DRAWN BY
PROJECT NUMBER
CHECKED BY
SHEET
MAY 13, 2026
1806-03-PS24
DATE
NO.REVISIONDATE
CONSULTANT
GOLETA CITY HALL
130 CREMONA DRIVE, GOLETA CA 93117
RRM DESIGN GROUP COPYRIGHT 2026.
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
AGENCY
C. PRESSLER
M. DOREMUS
M. DOREMUS
1. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE FOLLOWING CODES AND STANDARDS:
A. 2022 CALIFORNIA BUILDING CODE, PART 2, VOLUME 2 OF 2, AND TITLE 24 C.C.R. 2022 EDITION AND LATEST REVISIONS (INCLUDING SUPPLEMENTS AND ERRATA) HEREIN REFERRED TO AS “THE CODE”.
B. ANY OTHER REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK, INCLUDING THE STATE OF CALIFORNIA DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (CAL/OSHA).
C. CODES & STANDARDS REFERENCED IN THE CODE OR LISTED IN THESE NOTES AND SPECIFICATIONS.
2. ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK
PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE
CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT.
3. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. IN NO INSTANCE SHALL DIMENSIONS BE SCALED FROM THE DRAWINGS.
5. SEE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
A. SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS, EXCEPT AS NOTED B. SIZE AND LOCATION OF ALL INTERIOR AND EXTERIOR NON-BEARING PARTITIONS UNLESS
NOTED AND/OR DETAILED ON THE STRUCTURAL DRAWINGS
C. SIZE AND LOCATION OF ALL CONCRETE CURBS, EQUIPMENT PADS, PITS, FLOOR DRAINS,
SLOPES, DEPRESSED AREAS, CHANGE IN LEVEL, CHAMFERS, GROOVES, INSERTS, ETC D. SIZE AND LOCATION OF ALL FLOOR AND ROOF OPENINGS EXCEPT AS SHOWN E. FLOOR AND ROOF FINISHES
F. MISCELLANEOUS DRAINAGE AND WATERPROOFING
G. ALL FIREPROOFING REQUIREMENTS INCLUDING FIREPROOFING OF STRUCTURAL STEEL H. DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS
6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR THE FOLLOWING:
A. PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL AND SLAB OPENINGS, ETC., EXCEPT AS SHOWN OR NOTED.
B. ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS AND SLABS.
C. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL OR PLUMBING FIXTURES.
D. SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR BOLTS FOR MOTOR MOUNTS.
7. SEE CIVIL DRAWINGS FOR THE FOLLOWING:
A. HEIGHT AND/OR ELEVATION OF:
a. FINISHED SURFACE
b. TOP OF WALL
c. TOP OF GRADE
d. FINISHED GRADE
e. SLOPE
B. SITE CONCRETE WALKWAYS, CURBS & PAVING
8. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT ETC. THE
CONTRACTOR IS RESPONSIBLE FOR PROVISION OF TEMPORARY SHORING AND OTHER CONSTRUCTION AIDS,
INCLUDING ALL ENGINEERING OF SUCH SYSTEMS, FOR TEMPORARY SUPPORT OF NEW AND/OR EXISTING
STRUCTURAL ELEMENTS AS REQUIRED FOR ERECTION AND OTHER CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION (UNO). OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE
INSPECTION OF THE ABOVE ITEMS OR CONCERN CONSTRUCTION MEANS AND METHODS OR CONSTRUCTION SAFETY.
9. BACKFILL SHALL NOT BE PLACED BEHIND EXTERIOR AND INTERIOR RETAINING WALLS UNTIL THE CONCRETE / CMU HAS ACHIEVED FULL DESIGN STRENGTH. FOR BRACED WALLS SUPPORTED BY STRUCTURAL DIAPHRAGMS.
BACKFILL SHALL NOT BE PLACED BEHIND THE WALL UNTIL THE DIAPHRAGM HAS BEEN INSTALLED , AND FOR CONCRETE DIAPHRAGMS, HAS ACHIEVED FULL DESIGN STRENGTH.
10. THE CONTRACT STRUCTURAL DRAWINGS SHOW THE BUILDING IN ITS FINAL INTENDED POSITION. CONTRACTOR
SHALL MAKE PROVISIONS IN THE LAYOUT OF THE BUILDING TO TAKE INTO ACCOUNTS SHRINKAGE, CREEP, SHORTENING, ETC..
11. OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS, UNLESS SPECIALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., LARGER THAN 6" NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED IN STRUCTURAL MEMBERS.
12. ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE THE VERSION REFERENCED IN CHAPTER 35 OF THE CODE OR AS REFERENCED IN THE APPLICABLE DESIGN STANDARD.
13. CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH
STRUCTURES ARE FOUND, THE STRUCTURAL ENGINEER AND GEOTECHNICAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
14. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED ROOF OR FLOOR. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. THE CONTRACTOR TO DESIGN AND PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH.
15. CONTRACTOR SHALL COORDINATE SHORING WITH DRAWINGS OF RECORD TO INSURE PROVISIONS FOR POCKETS, BLOCKOUTS, OFFSETS, STEPPED FOOTINGS AND ANY OTHER ITEMS AFFECTED BY THE SHORING.
SHORING IS NOT THE RESPONSIBILITY OF THE SEOR. CONTRACTOR TO SUBMIT ANY SHORING DESIGN AND DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.
16. AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER MUST BE OBTAINED AT LEAST TWO WORKING DAYS BEFORE STARTING WORK WITH THIS PERMIT.
A. FOR PROJECTS IN SOUTHERN CALIFORNIA TELEPHONE NO. 1-800-422-4133.
B. FOR PROJECTS IN NORTHERN CALIFORNIA TELEPHONE NO. 1-800-227-2600.
17.EDGE OF SLAB DIMENSIONS TO BE COORDINATED AND VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO FABRICATION.
18.THE CONTRACTOR SHALL ALLOW SUFFICIENT TIME FOR THE ENGINEER OF RECORD TO THOROUGHLY REVIEW SUBMITTAL PACKAGES (10 WORKING DAYS, MINIMUM) AND REQUESTS FOR INFORMATION (7 WORKING DAYS MINIMUM).
GENERAL
1.DIMENSIONS SHALL BE DEFINED TO INCLUDE BOTH HORIZONTAL DIMENSIONS AND VERTICAL DIMENSIONS (ELEVATIONS).
2. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE. DRAWINGS SHALL NOT BE SCALED.
3. SEE ARCHITECTURAL DRAWINGS FOR DIMENSION NOT NOTED ON STRUCTURAL DRAWINGS.
4. SEE ARCHITECTURAL AND/OR CIVIL DRAWINGS FOR FINISH FLOOR ELEVATIONS.
5. SEE ARCHITECTURAL DRAWINGS FOR ALL TOP OF SHEATHING AND/OR ROOF ELEVATIONS.
6. THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES OR INCONSISTENCIES.
DIMENSIONS
1. DEAD LOADS:
2. FLOOR LIVE LOADS: (2022 CBC SECTION 1603.1.1)
3. ROOF LIVE LOADS (2022 CBC SECTION 1603.1.2)
4. ROOF SNOW LOADS (2022 CBC SECTION 1603.1.3):
5. WIND DESIGN DATA (2022 CBC SECTION 1603.1.4) :
6. EARTHQUAKE DESIGN DATA (2022 CBC SECTION 1603.1.5):
7. GEOTECHNICAL INFORMATION (2022 CBC SECTION 1603.1.6):
REFER TO FOUNDATION GENERAL NOTES
SITE AND OCCUPANCY PARAMETERS
PARAMETERVALUEREFERENCE
RISK CATEGORY II2022 CBC TABLE 1604.5
SEISMIC IMPORTANCE FACTOR I = 1.0ASCE 7-16 TABLE 1.5-2 MAPPED SPECTRAL RESPONSE ACCELERATIONS:
S S = 2.322
2022 CBC 1613.2.1
S 1 = 0.818
SITE CLASSD (DEFAULT)2022 CBC 1613.2.2
SPECTRAL RESPONSE COEFFICIENTS:
S DS = 1.858
2022 CBC 1613.2.4
S D1 = 0.927
COMPONENTS & CLADDING WIND PRESSURES (PSF)
LOCATION
COMPONENT TRIBUTARY AREA (SQ FT)
10100500
ROOF
ZONE 1'-19.4-19.4-16.0
ZONE 1-33.8-26.6-21.2
ZONE 2-44.5-35.6-28.4
ZONE 3-60.7-41.9-28.4
ALL ZONES16.016.016.0
OVERHANG
ZONE 1'-33.8-32.0-21.2
ZONE 1-33.8-32.0-21.2
ZONE 2-44.5-32.0-23.0
ZONE 3-60.7-39.2-23.0
WALL
ZONE 4-23.0-19.9-17.6
ZONE 5-28.4-22.1-17.6
POSITIVE21.217.616.0
DEAD LOADS
LOCATIONSUNIFORM (PSF)
ROOF:BUILT UP ROOF OVER SAWN LUMBER
W/ ACOUSTICAL TILE CEILING17
FLOOR:CARPET OVER GYPCRETE OVER TJI
JOISTS24
EXTERIOR BEARING WALLS:10" CONCRETE WALL106
EXTERIOR BEARING WALLS:PLASTER/STUCCO EXTERIOR WALL21
INTERIOR NON BEARING WALLS: NON-BEARING PARTITION WALL9
ROOF LIVE LOADS
OCCUPANCY OR USEUNIFORM
(PSF)
CONC.
(LBS)REFERENCE
ROOF
ORDINARY FLAT, PITCHED AND CURVED ROOFS (THAT
ARE NOT OCCUPIABLE)
20___2022 CBC TABLE
1607.1
SNOW DESIGN DATA
PARAMETERVALUEREFERENCE
GROUND SNOW LOADPg = 0 PSFASCE 7-16 7.2
WIND DESIGN DATA
PARAMETERVALUEREFERENCE
ULTIMATE DESIGN WIND SPEED (3-SEC GUST)VULT = 92 MPH2022 CBC FIG. 1609.3 NOMINAL DESIGN WIND SPEED (3-SEC GUST)VASD = 72 MPH2022 CBC 1609.3.1 EXPOSURE CATEGORYC2022 CBC 1609.4.3
INTERNAL PRESSURE COEFFICIENT:GCpi = ± 0.18ASCE 7-16 TABLE 26.13-1
DESIGN INFORMATION
FLOOR LIVE LOADS
OCCUPANCY OR USEUNIFORM
(PSF)
CONC.
(LBS)REFERENCE
OFFICES50___2022 CBC TABLE 1607.1
1. GEOTECHNICAL INFORMATION AND FOUNDATION DESIGN IS BASED ON THE FOLLOWING:
A. DESIGN LATERAL SOIL LOADS ARE IN ACCORDANCE WITH 2022 CBC TABLE 1610.1 B. ALLOWABLE FOUNDATION BEARING AND LATERAL PRESSURES ARE IN ACCORDANCE WITH 2022 CBC TABLE 1806.2
C. VALUES LISTED SHALL BE VERIFIED BY A LICENSED GEOTECHNICAL ENGINEER
2. SPREAD OR CONTINUOUS FOOTINGS:
NOTES:
A. THE ALLOWABLE CAPACITY MAY BE INCREASED BY ONE-THIRD WHEN CONSIDERING LOADS OF SHORT DURATION SUCH AS WIND OR SEISMIC FORCES.
B. THE ALLOWABLE LATERAL RESISTANCE CAN BE TAKEN AS THE SUM OF THE FRICTIONAL RESISTANCE AND PASSIVE RESISTANCE .
C. THE UPPER 0 FOOT OF SOIL NOT PROTECTED BY PAVEMENT SHALL BE NEGLECTED WHEN CALCULATING PASSIVE RESISTANCE.
D. COMPACTED FILL SHOULD BE PREPARED AS FOLLOWS: A MIN OF 12" OF COMPACTED FILL SHALL BE PROVIDED, COMPACTED TO A MIN OF 90 PERCENT MODIFIED PROCTOR IN ACCORDANCE WITH ASTM D 1557 (2022 CBC 1804.6)
E. MAY BE DOUBLED FOR ISOLATED POLES PER 2022 CBC 1806.3.4
4. WHERE NOT SHOWN ON THE DRAWINGS, CONTRACTOR TO PROVIDE FOR DESIGN AND INSTALLATION OF ALL
CRIBBING, SHEATHING AND SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION
PROCEDURES INCLUDING LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS, AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES.
5. CONTRACTOR TO PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND WATER AND/OR SEEPAGE.
6. EXCAVATION FOR FOOTINGS SHALL BE APPROVED BY THE INSPECTOR OR GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE AND REINFORCING.
7. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMITS AND INSTALLATION OF SUCH BRACING.
8. EXCAVATIONS SHALL BE CUT SQUARE AND SMOOTH, WITH LEVEL BOTTOMS.
9. FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE MECHANICALLY
COMPACTED IN LAYERS IN ACCORDANCE WITH THE GEOTECHNICAL INVESTIGATION REPORT AND APPROVED BY THE GEOTECHNICAL ENGINEER. FLOODING WILL NOT BE PERMITTED. ALL FILLS USED TO
SUPPORT FOUNDATIONS SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER REPRESENTATIVE PER SECTION 1705.6 OF THE CODE.
10. ALL ABANDONED FOOTINGS, UTILITIES, ETC. SHALL BE REMOVED. NEW FOOTINGS MUST EXTEND INTO UNDISTURBED SOILS.
11. PIPES WITHIN THE ZONE OF INFLUENCE OF BUILDING OR SITE ELEMENT FOUNDATIONS SHALL BE ENCASED IN LEAN CONCRETE AT THE DIRECTION OF THE GEOTECHNICAL ENGINEER OF RECORD.
ELEMENTALLOWABLE BEARING
CAPACITY (PSF) A
ALLOWABLE LATERAL RESISTANCE B
PASSIVE RESISTANCE
(PSF/FT BELOW
GRADE) E
COHESION (PSF)
CONT FOOTING1,500100120
FOUNDATION
EXISTING CONDITIONS
1. ALL INFORMATION SHOWN ON THE PLANS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE FROM PLANS SUPPLIED BY THE OWNER, BUT WITHOUT GUARANTEE OF ACCURACY.
2. WHERE ACTUAL CONDITIONS ARE NOT IN ACCORDANCE WITH THE INFORMATION PRESENTED, THE ARCHITECT AND/OR STRUCTURAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY. NO MODIFICATIONS OF THE PLANS FOR NEW CONSTRUCTION SHALL BE MADE WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT.
EXISTING UNDERGROUND UTILITIES
1. THE ARCHITECT AND ENGINEERS ARE NOT RESPONSIBLE FOR THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES WHETHER OR NOT SHOWN ON THE DRAWINGS. DRAWINGS, IF ANY, IS APPROXIMATE. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATING AND TRENCHING ON THE SITE. THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND/OR STRUCTURAL ENGINEER SHOULD ANY SUCH UNIDENTIFIED CONDITIONS BE DISCOVERED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES WHICH MAY RESULT FROM HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ALL EXISTING UNDERGROUND UTILITIES.
3. AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER MUST BE OBTAINED AT LEAST TWO WORKING DAYS BEFORE STARTING WORK WITH THIS PERMIT.
A. FOR PROJECTS IN SOUTHERN CALIFORNIA TELEPHONE NO. 1-800-422-4133.
B. FOR PROJECTS IN NORTHERN CALIFORNIA TELEPHONE NO. 1-800-227-2600.
DEMOLITION
1. ALL DEMOLITION SHALL BE CARRIED ON IN SUCH A WAY AS NOT TO DAMAGE EXISTING ELEMENTS, WHICH ARE TO REMAIN IN THE FINISHED STRUCTURE.
2. ALL ELEMENTS OF THE STRUCTURE, WHICH ARE TO REMAIN, AND WHICH ARE DAMAGED DURING DEMOLITION WORK SHALL BE REPLACED AT NO ADDITIONAL COST. EXISTING ELEMENTS SHALL BE PROTECTED TO THE FULLEST EXTENT POSSIBLE, IN ORDER TO MITIGATE DAMAGE.
3. CONTRACTOR IS REPONSIBLE FOR REMOVAL AND REPLACEMENT OF ALL EXISTING ELEMENTS THAT ARE NECESSARY FOR THE INSTALLATION OF ALL NEW WORK.
4. WHERE EXISTING PARTITION WALLS ARE TO BE DEMOLISHED, CONTRACTOR SHALL VERIFY WALLS ARE NON-BEARING PRIOR TO DEMOLITION. IF WALLS ARE FOUND TO BE BEARING, CONTRACTOR SHALL NOTIFY
ARCHITECT IMMEDIATELY
1. FRAMING LUMBER SHALL MEET THE FOLLOWING MINIMUM STANDARDS EXCEPT WHERE OTHERWISE NOTED:
2. FLOOR JOISTS SHALL BE GRADE STAMPED “S-DRY” WHICH INDICATES A MOISTURE CONTENT NOT EXCEEDING 19 PERCENT.
3. ALL SOLE PLATES AND TOP PLATES SHALL BE GRADE STAMPED “KD” WHICH INDICATES KILN DRIED WITH A MOISTURE CONTENT NOT EXCEEDING 15 PERCENT AT BUILDINGS WITH 4 OR MORE STORIES.
4. STUD WALLS SHOWN ON PLANS ARE NONBEARING PARTITIONS WALLS, BEARING WALLS OR SHEAR WALLS BELOW THE FRAMING LEVEL, UNLESS NOTED OTHERWISE. STUDS SHALL BE SIZE AND SPACING AS NOTED IN THE DRAWINGS, SEE PLANS AND ARCHITECTURAL DRAWINGS. UNLESS OTHERWISE NOTED.
5. MINIMUM FRAMING NAILING SHALL CONFORM TO CBC TABLE 2304.10.2. ALL NAILS SHALL BE COMMON WIRE NAILS. PREDRILL NAIL HOLES TO 70% OF NAIL SHANK DIAMETER WHERE NAILING TENDS TO SPILT WOOD.
6. UNLESS OTHERWISE NOTED, ALL WOOD SILL PLATES UNDER BEARING, EXTERIOR, OR SHEAR WALLS IN CONTACT WITH CONCRETE OR MASONRY SHALL BE BOLTED TO THE CONCRETE OR MASONRY WITH 5/8” Ø X 12” BOLTS W/ 0.229" X 3" X 3" PLATE WASHER (GALV) AT 4'-O”' O.C. BEGINNING AT 9" O.C. MAXIMUM FROM EACH END OF THE PLATES. THE BOLTS SHALL EXTEND A MINIMUM OF 7” INTO THE CONCRETE OR MASONRY. (POWDER DRIVEN PINS AT 1/3 OF THE BOLT SPACING OR 24” O.C. MAXIMUM MAY BE SUBSTITUTED FOR THE ANCHOR BOLTS AT INTERIOR NON-SHEAR WALLS ONLY).
7. PRESERVATIVE TREATMENT:
A. WOOD MEMBERS SHALL BE PRESERVATIVE TREATED IN ACCORDANCE WITH AITC 109-07, STANDARD FOR PRESERVATIVE TREATMENT, BASED ON THE SERVICE CONDITION PER THE USE CATEGORIES (UC#) SPECIFIED IN AWPA U1-20.
a. UC1 - INTERIOR CONSTRUCTION, ABOVE GROUND, DRY - NO PRESERVATIVE TREATMENT REQUIRED. b. UC2 - INTERIOR CONSTRUCTION, ABOVE GROUND, WET - PRESERVATIVE TREATMENT REQUIRED IF THE HUMIDITY OR MOISTURE CONDENSATION IS 20% OR GREATER. c. UC3 - EXTERIOR CONSTRUCTION ABOVE GROUND - PRESERVATIVE TREATMENT REQUIRED.
B. FOR ALL TREATED WOOD MEMBERS, ALL CUTS, HOLES OR INJURIES SUCH AS ABRASIONS OR HOLES FROM
REMOVAL NAILS AND SPIKES WHICH MAY PENETRATE THE TREATED ZONE SHALL BE FIELD TREATED IN ACCORDANCE WITH AWPA M4-15. THE FOLLOWING FILED TREATMENTS SHALL BE USED:
a. BORED HOLES: HOLES FOR CONNECTORS OR BOLTS MAY BE TREATED BY PUMPING COAL TAR ROOFING CEMENT MEETING ASTM D5643 INTO HOLES USING A GREASE GUN OR SIMILAR DEVICE. b. EXTERIOR: COPPER NAPHTHENATE.
c. INTERIOR: INORGANIC BORON PRESERVATIVES LIMITED TO USE IN APPLICATIONS NOT IN CONTACT WITH GROUND AND CONTINUOUSLY PROTECTED FROM LIQUID WATER.
C. ALL LUMBER IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER WITH AWPA TREATMENT C2 USING EITHER ALKALINE QUAT (ACQ TYPE B AND D), COPPER AZOLE (CBA-A, CA-B), OR SODIUM BORATES (SBX). ANCHOR BOLTS, FASTENERS, AND METAL FRAMING CONNECTORS IN CONTACT WITH PRESSURE TREATED LUMBER SHALL BE HOT-DIPPED GALVANIZED TO A RATING OF G-185 PER ASTM A653.
8. PROVIDE 2 STUDS UNDER ALL 4 X 10 AND LARGER BEAMS OR HEADERS AT SPANS 6 FEET OR LONGER, UNLESS OTHERWISE NOTED. WHERE POSTS OR MULTIPLE STUDS UNDER BEAMS OR HEADERS ARE CALLED FOR ON DRAWINGS THOSE POSTS OR MULTIPLE STUDS SHALL BE CARRIED TO THE FOUNDATION/PODIUM LEVEL.
9. PROVIDE THE FOLLOWING BLOCKING AS A MINIMUM, UNLESS SHOWN OTHERWISE:
2x FULL DEPTH SOLID BLOCKING BETWEEN JOISTS OVER SUPPORT. 2x FULL DEPTH SOLID BLOCKING BETWEEN JOISTS OVER AND BELOW PARTITION WALLS.
10. DOUBLE JOISTS UNDER PARTITIONS RUNNING PARALLEL TO JOISTS, UNLESS SUPPORTED BY A WALL BELOW OR SHOWN OTHERWISE. NAIL DOUBLED JOISTS WITH 16d AT 12” O.C., STAGGERED.
11. BRIDGING SHALL BE 2 X SOLID BLOCKS, INSTALLED AS FOLLOWS:
ROOF JOISTS MORE THAN 10" DEPTH, 8'-O” O.C. MAXIMUM, NOT MORE THAN 8'-0' FROM SUPPORT.
FLOOR JOISTS MORE THAN 10” DEPTH, 8'-O” O.C. MAXIMUM, NOT MORE THAN 8'-0' FROM SUPPORT.
12. JOIST HANGERS AND OTHER METAL FRAMING ACCESSORIES ARE REFERRED TO ON PLANS BY PARTICULAR TYPE AS MANUFACTURED BY SIMPSON STRONG-TIE COMPANY, STOCKTON, CALIFORNIA. ACCESSORIES OF
OTHER MANUFACTURES WITH EQUIVALENT LOAD CARRYING CHARACTERISTICS MAY BE USED WITH APPROVAL BY SEOR.
13. FIRE STOPPING, BACKING FOR INTERIOR FINISHES, NONBEARING WALLS, AND OTHER NON-STRUCTURAL FRAMING ARE NOT NECESSARILY SHOWN ON STRUCTURAL DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS.
14. THE TOP OF NON-BEARING WALLS SHALL NOT BE IN CONTACT WITH JOISTS/TRUSSES/RAFTERS ABOVE. REFER TO THE REFERENCED DETAILS FOR REQUIRED GAP, 1/2" MINIMUM, UNLESS NOTED OTHERWISE IN DETAIL.
SAWN LUMBER PROPERTIES
USESIZESPECIESGRADEREFERENCE
MUDSILLS
2x4D.F.STANDARD OR BETTER
PRESSURE TREATED
2022 CBC
2303.1.9 2x6 AND LARGERD.F.NO. 2 OR BETTER
PRESSURE TREATED
2xREDWOOD FOUNDATION GRADE
HORIZONTAL FRAMING LUMBER
ROOF JOISTS AND RAFTERS2xD.F.NO. 2
WCLIB &
WWPA
FLOOR JOISTS2xD.F.NO. 2
HEADERS AND BEAMS4xD.F.NO. 2
ANY OTHER HORIZONTAL4x4 AND SMALLERD.F.NO. 2
6x6 AND LARGERD.F.NO. 1
VERTICAL FRAMING LUMBER
TOP PLATES2xD.F.NO. 2
WCLIB &
WWPA
STUDS2x4 & 3x4D.F.STUD
2x6 & 2x8D.F.NO. 2
POSTS4x4 & 4x6 POSTSD.F.NO. 2
6x6 & LARGER POSTSD.F.NO. 1
ALL OTHER FRAMING LUMBER
ALL OTHER FRAMING LUMBER,
UNOALL SIZESD.F.STANDARD & BETTERWCLIB &
WWPA
SAWN LUMBER
GENERAL:
USE ALL SPECIFIED FASTENERS AS SPECIFIED ON PLANS. IF NOT INDICATED ON PLANS PROVIDE FASTENERS PER MFR'S
APPROVED ICC-ESR REPORT OR PRODUCT LITERATURE
HOLDOWNS:
1. DO NOT OVER TIGHTEN NUTS ON TIE-DOWN ANCHOR RODS OR BOLTS. TIGHTEN ANCHOR ROD NUTS
ONE-THIRD TO ONE HALF TURN BEYOND FINGER TIGHT
2. INSTALL ALL HOLDOWNS TIGHT TO END STUDS/POST, DO NOT USE FILLER BLOCKS. FOR MISALIGNED ANCHOR BOLTS, EXTEND THE ANCHOR ROD AT A 1:6 (HORIZ/VERT) USING A COUPLER WITH EQUIVALENT ANCHOR ROD
AND INSTALL THE HOLDOWN HIGHER ON END STUD / POST
3. FOR HOLDOWNS THAT BOLT TO END POSTS, INSTALL THE HEAD OF THE BOLT TO THE BRACKET SIDE, AND ON
THE SIDE OPPOSITE THE BRACKET, INSTALL A WASHER BETWEEN THE NUT AND THE STUD / POSTS TIE DOWN & COLLECTOR STRAPS:
1. TIE DOWN AND COLLECTOR STRAPS SHALL BE INSTALLED STRAIGHT AND TRUE. DO NOT FOLD, BEND, KINK OR
OTHERWISE ALTER CONNECTOR STRAPS
2. INSTALL TIE DOWN STRAPS DIRECT TO POST IN LIEU OF OVER SHEATHING. STRAPS MAY BE INSTALLED ON THE
UNSHEATHED SIDE OF THE END STUDS / POSTS
HARDWARE AND CONNECTORS
FASTENER INFORMATION
1. ALL NAILS SPECIFIED TO BE COMMON NAILS, UNLESS SPECIFIED OTHERWISE. 1 12 02 123 3 12
16d
COMMON
0.162"
0.148"
10d
COMMON
8d
COMMON
0.131"
1. WOOD STRUCTURAL PANELS SHALL MEET THE FOLLOWING MINIMUM STANDARDS EXCEPT WHERE OTHERWISE NOTED:
TABLE NOTES:
A. WOOD STRUCTURAL PANELS SHALL CONFORM TO THE REQUIREMENTS FOR THEIR TYPE IN
ACCORDANCE WITH THE FOLLOWING VOLUNTARY STANDARDS BY THE ENGINEERED WOOD ASSOCIATION (APA):
a. VOLUNTARY PRODUCT STANDARD, STRUCTURAL PLYWOOD, PS 1-09 b. VOLUNTARY PRODUCT STANDARD, PERFORMANCE STANDARD FOR WOOD-BASED STRUCTURAL-USE PANELS, PS 2-10
B. WOOD STRUCTURAL PANELS SHALL BE IDENTIFIED BY THE APA TRADEMARK INDICATING
CONFORMANCE TO THE APPLICABLE VOLUNTARY STANDARD
C. WHERE PANELS ARE EXPOSED TO REPEATED WETTING AND REDRYING, LONG-TERM EXPOSURE TO WEATHER, OR CONDTIONS OF SIMILAR SEVERITY, "EXTERIOR" APA RATED PLYWOOD SHEATHING SHALL BE USED. C-D “EXPOSURE 1" APA RATED PLYWOOD SHEATHING (CDX) SHALL NOT BE USED FOR CONDITIONS INVOLVING LONG-TERM EXPOSURE TO WEATHER.
a. EXCEPTION: WOOD STRUCTURAL PANEL ROOF SHEATHING EXPOSED TO THE OUTDOORS ON THE UNDERSIDE IS PERMITTED TO BE "EXPOSURE 1" TYPE.
b. WOOD STRUCTURAL PANELS TO BE USED AS SIDING SHALL COMPLY WITH ANSI/APA PRP-210.
D. ORIENTED STRAND BOARD (OSB) WITH EQUIVALENT CLASSIFICATION AND RATINGS MAY BE USED IN LIEU OF PLYWOOD FOR WOOD STRUCTURAL PANEL WALL SHEATHING.
2. TRANSPORTATION, STORAGE, AND HANDLING:
A. TRANSPORTATION
a. IN TRANSPORTING PANELS ON OPEN TRUCK BEDS, COVER THE BUNDLES WITH A TARP.
B. STORAGE
a. ALWAYS STORE THE PANELS UNDER COVER WHENEVER POSSIBLE b. WHEN STORING PANELS OUTSIDE STACK THEM ON A LEVEL SURFACE ON TOP OF STRINGERS OR OTHER BLOCKING, THREE STRINGERS MINIMUM.
c. NEVER LEAVE PANELS IN CONTACT WITH THE GROUND
d. COVER THE STACK WITH A PLASTIC TARP, ENSURING THAT THE BUNDLE IS WELL VENTILATED TO PREVENT MILDEW.
e. IF MOISTURE ABSORPTION IS EXPECTED, CUT THE STEEL BAND TO PREVENT DAMAGE f. KEEP SANDED OR OTHER APPEARANCE GRADE PANELS AWAY FROM HIGH TRAFFIC AREAS C. HANDLING
a. ALWAYS PROTECT ENDS AND EDGES, ESPECIALLY TONGUE AND GROOVE PRODUCTS, FROM PHYSICAL DAMAGE.
b. ACCLIMATIZE THE PANELS FOR 24 HOURS MINIMUM BEFORE INSTALLATION BY STANDING THE
PANELS ON EDGE WITH A GAP BETWEEN EACH TO ALLOW FOR AIR CIRCULATION OR PER MANUFACTURER'S RECOMMENDATIONS.
3. PLYWOOD ORIENTATION
A. ROOF AND FLOOR SHEATHING SHALL BE LAID WITH THE GRAIN OF THE OUTER PILES PERPENDICULAR TO THE FRAMING MEMBERS, SHALL BE CONTINUOUS OVER 2 JOIST BAYS MINIMUM AND END JOINTS SHALL BE JOINED OVER FRAMING AND STAGGERED. LEAVE A 18" GAP BETWEEN PANELS TO ALLOW FOR PANEL EXPANSION UNLESS RECOMMENDED OTHERWISE BY THE PANEL MANUF. REFER TO SPECIFIC DETAILS IN THE DRAWINGS FOR FURTHER PARAMETERS.
B. PLYWOOD OR OSB WALL SHEATHING MAY BE APPLIED VERTICALLY OR HORIZONTALLY. ALL END JOINTS BE JOINED OVER FRAMING AND STAGGERED.
4. BLOCKING:
A. ROOF: ALL ROOF SHEATHING SHALL BE BLOCKED UNLESS SPECIFICALLY ALLOWED ON PLANS. WHERE PERMITTED TO BE UNBLOCKED, ALL UNBLOCKED EDGES SHALL BE TONGUE AND GROOVE.
B. ALL FLOOR SHEATHING SHALL BE BLOCKED UNLESS SPECIFICALLY ALLOWED ON PLANS. WHERE PERMITTED TO BE UNBLOCKED, ALL UNBLOCKED EDGES SHALL BE TONGUE AND GROOVE.
C. WALLS: ALL SHEAR WALLS SHALL BE FULLY BLOCKED AT PLYWOOD EDGES.
5. FASTENERS
A.USE SHEATHING NAILS SAME GAUGE AS COMMON WIRE NAILS WITH LENGTHS AT LEAST EQUAL TO SHEATHING THICKNESS PLUS REQUIRED PENETRATION PER AWS SDPWS TABLE 4.2A OR 4.3A (AS REQUIRED).
B. EQUIVALENT PNEUMATIC DRIVE NAILS MAY BE USED IF FASTENER MANUFACTURER HAS RECEIVED ICC OR IAPMO APPROVAL FOR THE INTENDED USE. FASTENERS TO BE SUBSTITUTED SHALL BE EQUIVALENT IN LATERAL AND WITHDRAWAL STRENGTH TO THE SIZE OF COMMON NAIL SPECIFIED.
C. USE OF MACHINE NAILING IS SUBJECT TO A SATISFACTORY JOB SITE DEMONSTRATION FOR EACH PROJECT AND THE APPROVAL BY THE PROJECT ARCHITECT OR STRUCTURAL ENGINEER. THE APPROVAL IS SUBJECT TO CONTINUED SATISFACTORY PERFORMANCE. MACHINE NAILING WILL NOT BE APPROVED IN 5/16” PLYWOOD OR OSB SHEATHING. IF NAIL HEADS PENETRATE THE OUTER PLY MORE T HAN WOULD
BE NORMAL FOR A HAND HAMMER OR IF MINIMUM ALLOWABLE EDGE DISTANCES ARE NOT MAINTAINED, THE PERFORMANCE WILL BE DEEMED UNSATISFACTORY.
D. TYPICAL NAILING SHALL BE 10d AT 6” O.C. AT ALL SUPPORTED EDGES AND OVER SHEAR WALLS, AND 10D AT 12” O.C. AT ALL INTERMEDIATE SUPPORTS, UNLESS OTHERWISE NOTED, SEE PLANS AND REFER TO SHEAR WALL SCHEDULE.
WOOD STRUCTURAL PANELS (SHEATHING)
WOOD STRUCTURAL PANEL PROPERTIES
USE PLYBOND
CLASSIFICATION C
SHEATHING
GRADE
PERFORMANCE
RATINGSPAN RATINGRATING BREFERENCE A
ROOF5EXPOSURE 1
REFER TO TYPICAL DIAPHRAGM SCHEDULE
APA2022 CBC
2303.1.5
(DOC PS 1-19
OR PS 2-18)
FLOOR5EXPOSURE 1APA
WALL D5EXPOSURE 1 REFER TO TYPICAL SHEAR WALL SCHEDULE APA
STRUCTURAL GLUED LAMINATED TIMBER PROPERTIES C
USECOMBINATION
SYBMOL
SPECIES
OUTER/CORERATING BAPPEARANCEREFERENCE A
SIMPLE SPAN24F-V4DF/DFAITC OR
APA-EWSSEE NOTE D2022 CBC 2303.1.3
(AITC/ANSI 190.1-07
OR ANSI 190.1-12
AND ASTM D3737)
CANTILEVER OR MULTI
- SPAN/CONTINUOUS24F-V8DF/DFAITC OR
APA-EWSSEE NOTE D
1. STRUCTURAL GLUED LAMINATED TIMBER SHALL MEET THE FOLLOWING MINIMUM STANDARDS EXCEPT WHERE OTHERWISE NOTED:
TABLE NOTES:
A. GLUED LAMINATED MEMBERS SHALL BE MANUFACTURED AS REQUIRED IN ASTM D 3737 AND EITHER OF THE FOLLOWING STANDARDS:
a. ANSI 117-15 (CODE REFERENCED)
b. ANSI 190.1-22 (CURRENT STANDARD)
B. STRUCTURAL GLUED LAMINATED TIMBERS SHALL BE IDENTIFIED WITH A STAMP BEARING THE AITC QUALITY MARK OR AWA-EPS TRADEMARK. PLACE STAMPS ON SURFACES THAT WILL NOT BE EXPOSED TO VIEW IN THE COMPLETED STRUCTURE. SUBMIT CERTIFICATES OF CONFORMANCE INDICATING THAT THE GLULAM
MEMBERS CONFORM TO THE REQUIREMENTS OF ANSI
C. REFER TO GENERAL WOOD NOTES FOR PRESERVATIVE TREATMENT.
D. STRUCTURAL GLUED LAMINATED MEMBERS SHALL BE OF THE FOLLOWING APPEARANCE GRADES:
a. INDUSTRIAL: TYPICAL EXPOSURE FOR MEMBERS NOT EXPOSED TO VIEW IN THE COMPLETED WORK.
b. ARCHITECTURAL: EXPOSURE FOR MEMBERS EXPOSED TO VIEW IN THE COMPLETED WORK. c. PREMIUM: EXPOSURE FOR SPECIFIC EXPOSED MEMBERS AS INDICATED ON THE DRAWINGS.
2. ADHESIVES USED IN THE GLULAM MANUFACTURING PROCESS SHALL CONFORM TO ANSI 405-18 (PREVIOUSLY AITC 405), STANDARD FOR ADHESIVES FOR USE IN STRUCTURAL GLUED LAMINATED TIMBER. ADHESIVES SHALL BE A WET-USE ADHESIVE MEETING THE REQUIREMENTS OF ASTM D5229.
3. MEMBERS SHALL HAVE A SEALER ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS AFTER FABRICATION. END SEAL EACH END OF THE MEMBER IMMEDIATELY AFTER CUTTING.
4. PROVIDE CAMBER AS INDICATED ON THE DRAWINGS.
5. TRANSPORTATION, STORAGE, AND HANDLING:
A. REFER TO AITC 111-05, RECOMMENDED PRACTICE FOR PROTECTION OF STRUCTURAL GLUED LAMINATED TIMBER DURING TRANSIT, STORAGE AND ERECTION.
a. LOAD WRAP OR BUNDLE WRAP INDUSTRIAL APPEARANCE GRADE MEMBERS. ARCHITECTURAL
OR PREMIUM GRADE MEMBERS SHALL BE WRAPPED INDIVIDUALLY AND REMAIN UNTIL
PROTECTION IS NO LONGER REQUIRED FROM WEATHER, SUNLIGHT, SOILING, AND/OR OTHER TRADES. SLIT UNDERSIDE OF WRAPPINGS TO PREVENT ACCUMULATION OF MOISTURE.
B. STORAGE:
a. STORE GLULAM MEMBERS ON A FLAT SURFACE AT LEAST 6" ABOVE THE GROUND. PLACE SUPPORTS CLOSE ENOUGH TOGETHER TO PREVENT NOTICEABLE DEFLECTIONS.
STRUCTURAL GLUED LAMINATED TIMBER
1. THE FOLLOWING SUBMITTALS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE ENGINEER:
A. ROUGH CARPENTRY: WOOD PRODUCT DATA AND MANUFACTURER'S CERTIFICATES
2. BEFORE SUBMITTING EACH SUBMITTAL, (INCLUDES SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND SIMILAR SUBMITTALS), THE CONTRACTOR SHALL HAVE:
A. REVIEWED AND COORDINATED EACH SUBMITTAL WITH OTHER SUBMITTALS AND WITH THE REQUIREMENTS OF THE WORK AND THE CONTRACT DOCUMENTS. THIS INCLUDES THE CONTRACTOR REVIEWING AND VERIFYING THAT THE SUBMITTAL IS COORDINATED AMONG ALL CONSTRUCTION TRADES:
B. DETERMINED AND VERIFIED ALL FIELD MEASUREMENTS, QUANTITIES, DIMENSIONS , SPECIFIED
PERFORMANCE AND DESIGN CRITERIA, INSTALLATION REQUIREMENTS, MATERIALS, CATALOG NUMBERS
AND SIMILAR INFORMATION
C. DETERMINED AND VERIFIED ALL INFORMATION RELATIVE TO THE CONTRACTOR'S RESPONSIBILITIES FOR
MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES OF CONSTRUCTION, AND SAFETY PRECAUTIONS AND PROGRAMS.
D. REVIEWED AND VERIFIED THAT THE ARCHITECT'S OR ENGINEER'S COMMENTS FROM PREVIOUS SUBMITTAL ROUNDS HAVE BEEN ADDRESSED.
3. EACH SUBMITTAL SHALL BEAR A STAMP OR SPECIFIC WRITTEN CERTIFICATION THAT THE CONTRACTOR HAS
SATISFIED THEIR OBLIGATIONS UNDER THE CONTRACT DOCUMENTS WITH RESPECT TO THE CONTRACTOR'S REVIEW AND APPROVAL OF THAT SUBMITTAL.
4. THE CONTRACTOR'S OBLIGATION TO PERFORM AND COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS SHALL BE ABSOLUTE:
a. REVIEW AND APPROVAL OF SHOP DRAWINGS BY THE ARCHITECT AND/OR ENGINEER DOES NOT
CONSTITUTE APPROVAL OF A CHANGE REQUEST, SUBSTITUTION OR MODIFICATION TO THE CONTRACT DRAWINGS.
b. THE ARCHITECT AND ENGINEER SHALL BE NOTIFIED OF CHANGE REQUESTS, SUBSTITUTIONS OR
MODIFICATIONS TO THE CONTRACT DRAWINGS IN WRITING BEFORE AND SEPARATE FROM THE SUBMITTAL PRIOR TO SUBMISSION.
5. FABRICATION FOR ITEMS IN THESE DOCUMENTS SHALL NOT COMMENCE UNTIL THE SUBMITTAL HAS BEEN REVIEWED AND APPROVED BY THE ENGINEER.
6.THE CONTRACTOR SHALL ALLOW SUFFICIENT TIME FOR THE ENGINEER OF RECORD TO THOROUGHLY REVIEW SUBMITTAL PACKAGES (10 WORKING DAYS, MINIMUM).
SUBMITTALS
1. SHOP FABRICATION REQUIRES SPECIAL INSPECTION IN ACCORDANCE WITH CODE SECTION 1704.2.5.
EXCEPTION: SHOP SPECIAL INSPECTIONS ARE NOT REQUIRED WHEN WORK IS DONE ON THE PREMISES OF
FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK IN ACCORDANCE WITH CODE SECTION 1704.2.5.1. THE FOLLOWING ACCREDITATIONS MEET THE REQUIREMENTS OF THIS EXCEPTION:
B. WOOD BUILDINGS
a. STRUCTURAL GLUED LAMINATED TIMBER
SHOP FABRICATION
13 (E) STL COL
BEL
(E) STL COL
BEL
(E) 3 18" x 16 12" JST @ 8'-0" OC
(E) 5 18" x 31 12" GLULAM BM
(E) 5 18" x 30" GLULAM BM
(E) 5 18" x 27" GLULAM BM
(E) 3 18" x 16 12" 24F-V4 GLULAM BM (VIF)
(E) 3 18" x 16 12" 24F-V4 GLULAM BM (VIF)
(E) 5 18" x 16 12" 24F-V4 GLULAM BM (VIF)
(E) 'HU' HGR
(VIF)
(E) 'HU' HGR
(VIF)
(E) 'HU' HGR
(VIF)
(E) 'HU' HGR
(VIF)
(E) 'HU' HGR
(VIF)
(E) 2x6 SUBPURLIN
@ 24" OC
(N) 4x6 BM, TYP
(N) 'HU' HGR, TYP
(E) 2x6 SUBPURLIN
@ 24" OC
(E) 2x6 SUBPURLIN
@ 24" OC
(N) MU 'PHP-13'
WT = 1668#
(E) 3 18" x 16 12" 24F-V4 GLULAM BM (VIF)
(E) 3 18" x 16 12" 24F-V4 GLULAM BM (VIF)
(N) 5 18" x 16 12" 24F-V4 GLULAM BM
(E) 'HU' HGR
(VIF)
(N) 'HU' HGR
(E) 'HU' HGR
(VIF)
(N) 'HU' HGR
(E) 'HU' HGR
(VIF)
(E) 5 18" x 27" GLULAM BM
(E) 'HU' HGR
(VIF)
(E) 2x6 SUBPURLIN
@ 24" OC
(N) 4x6 BM, TYP
(N) 'HU' HGR, TYP
(N) MU 'PHP-11'
WT = 1456#
(E) 2x6 SUBPURLIN
@ 24" OC
(E) 2x6 SUBPURLIN
@ 24" OC
4'-0" MAX
(VIF)
4'-0" MAX
(VIF)
4'-0" MAX4'-0" MAX
VIF PLACEMENT OF (E) BM ALIGNS W/
(N) MU CURB, IF (E) BM DOES NOT
ALIGN, A (N) BM IN THE CORRECT
POSITION WILL NEED TO BE INSTALLED
VIF PLACEMENT OF (E) BM ALIGNS W/
(N) MU CURB, IF (E) BM DOES NOT
ALIGN, A (N) BM IN THE CORRECT
POSITION WILL NEED TO BE INSTALLED
NOTE:
IF THE (E) MEMBERS SHOWN ARE NOT
VERIFIED IN THE FIELD, THEY MUST BE
INSTALLED AS SHOWN.
41 S-301
15 S-301
15 S-301
23 B
C
D
E
B
C
D
E
23 ROOF FRAMING PLAN
1PARTIAL ROOF FRAMING PLAN - OPTION A
SCALE: 1/4" = 1'-0"
S-201
NORTH
ISSUE FOR BID
N:\1800\1806-03-ps24-goleta-city-hall-ti\structural\ConDocs\sheet-files\_goletahall-ti\1806-03-PS24 - Plans.dwg, S201, May 08, 2026 2:11pm, jdlong
PROJECT MANAGER
DRAWN BY
PROJECT NUMBER
CHECKED BY
SHEET
MAY 13, 2026
1806-03-PS24
DATE
NO.REVISIONDATE
CONSULTANT
GOLETA CITY HALL
130 CREMONA DRIVE, GOLETA CA 93117
RRM DESIGN GROUP COPYRIGHT 2026.
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
AGENCY
C. PRESSLER
M. DOREMUS
M. DOREMUS
ROOF FRAMING NOTES
1. SEE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS AND ELEVATIONS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING, ALL DIMENSIONS TO BE VERIFIED PRIOR TO CONSTRUCTION:
A. GRID DIMENSIONS AND HORIZONTAL CONTROL
B. ALL DIMENSIONS, ELEVATIONS, FINISH SURFACE, SLOPES, DRAINS, SLAB DEPRESSIONS, ETC C. LOCATION AND EXTENT OF EXTERIOR WALL ASSEMBLIES AND OPENINGS D. ALL NON STRUCTURAL WALLS
2. REFER TO THE FOLLOWING SHEETS FOR TYPICAL DETAILS:
3. SEE ARCHITECTURAL DRAWINGS FOR ALL TOP OF SHEATHING AND TOP OF WALL ELEVATIONS.
4. SEE ARCHITECTURAL, PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FOR SIZE AND LOCATION OF PIPES, DUCTS AND OTHER ROOF PENETRATIONS. FOR ROOF PENETRATIONS NOT SHOWN ON ROOF FRAMING PLAN, SEE DETAIL 15/S-301 FOR TYPICAL OPENINGS, UNO.
5. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS IN BEARING AND NON-BEARING WALLS.
6. ALL LINES AND/OR MEMBERS INDICATED AS "STRUT" SHALL RECEIVE (2) ROWS OF BOUNDARY NAILING (BN), STGR.
7. 'MU' INDICATES MECHANICAL UNIT. MAXIMUM ALLOWABLE WEIGHT IS SHOWN, INCLUDING CURB & COMBINATION ECONOMIZER & POWER EXHAUST. SEE MECHANICAL & ARCHITECTURAL DRAWINGS FOR EXACT LOCATION & WEIGHT OF EQUIPMENT. ATTACH MECH UNITS TO STRUCTURE PER DETAIL 31/S-301. SEE DETAIL 15/S-301 FOR OPENINGS IN ROOF FRAMING.
8. EXISTING FRAMING (INCLUDING, BUT NOT LIMITED TO, GLULAM GRADE STAMP, DIMENSIONS OF
FRAMING AND LOCATION OF FRAMING) SHALL BE CONFIRMED PRIOR TO STARTING WORK WITH THIS PERMIT.
DESCRIPTIONSHEET (S)
SYMBOLS AND ABBREVIATIONS S-101
STRUCTURAL GENERAL NOTES S-102
TESTING AND INSPECTIONS-102
ROOF FRAMING DETAILSS-301
14 DROPPED BEAM CONNECTION
1806-03-PP24 - S-301 - 411" = 1'-0"
(N) BM W/ HGR
PER PLAN
(E) PLY SHTG TO
REMAIN, DO NOT CUT
(E) GLB PER PLAN
2x BLKGROOF FRMG
PER PLAN
GLB PENETRATIONS
1806-03-PS24 -S301NTS
L/8
LENGTH (L)
DEPTH, (D)
NO NOTCHES
PERMITTED
NOTES:
1. THE MAXIMUM NUMBER OF HOLES SHALL NOT EXCEED 1 FOR EVERY 5 FEET OF BEAM LENGTH.
2. PENETRATIONS MAY NOT BE DRILLED THROUGH CANTILEVERS.
3. SQUARE PENETRATIONS MAY NOT BE CUT INTO BEAM
L/2 L/8L/8L/8
D/4 D/2 D/4
A = 1 12" OR D10, WHICHEVER IS LESS
B = 8 TIMES THE DIAMETER OF THE LARGEST HOLE
"A"
"B"
ZONE WHERE HORIZONTAL HOLES ARE PERMITTED FOR PASSAGE OF WIRES, CONDUIT, ETC.
OPNG
NOTE:
HANGERS NOT SHOWN FOR CLARITY, REFER TO
FRAMING PLAN FOR HANGERS.
SHTG NAILING REFERS TO NAILING INSTALLED OVER
(E) ROOF SHEATING
'ST12' CENTERED ON
JST, TYP
10d @ 6" OC SHTG
NAILING ALONG BM FOR
A DIST OF 2'-0" @ EA
CORNER OF OPNG
'ST12' CENTERED
ON BM, TYP
BM PER PLAN 2x4 FLAT
BLKG
OPENING AT FRAMING
1806-03-PS24 -S301 - 15NTS
BM PER PLAN
BM PER PLAN
10d @ 6" OC SHTG
NAILING ALONG BM
FOR A DIST OF 2'-0" @
EA CORNER OF OPNG
10d @ 6" OC SHTG
NAILING ALONG
BLKG FOR A DIST
OF 2'-0"
10d @ 6" OC SHTG
NAILING ALONG BLKG
FOR A DIST OF 2'-0"
2x4 FLAT BLKG
2x4 FLAT BLKG (OR
JST PER PLAN WO)
ROOF BEAM TO LOW BEAM CONN
1806-03-PP24 - S-301 - 351" = 1'-0"
(N) GLB PER PLAN
PLATE
LINE
PLATE
LINE
(N) 'H2.5A' TIE EA BM,
EA FACE (4 TOTAL PER
CONN)
(N) BM PER PLAN
(E) PLY SHTG TO
REMAIN, DO NOT CUT
(N) BM PER PLAN
EQEQ
(N) 2x CONT BLKG
ALONG BM, TYP
(N) 10d @ 6" OC, TYP
℄ OF SPLICE, WO
ROOF FRAMING @ MECH UNIT
1806-03-PP24 - S-301 - 311/2" = 1'-0"
S-301
32 S-301
33 S-301
35 S-301
32 S-301
34 WD BM PER PLAN
LINE OF MECH
UNIT. SEE PLAN
NOTES FOR
ADDL INFO
LOW WD BM
PER PLAN
WD BM
PER PLAN
WD BM PER PLAN
OPENING WO,
FOR ADDL INFO
SEE DETAIL 15/-
WD BM PER PLAN
SUBPURLIN, WO
(E) PLY SHTG TO
REMAIN, DO NOT CUT
SEE MECH DWGS FOR ANCHORAGE
(MIN (12) 'SDS' 14" x 3" EA LONG SIDE
& (5) 'SDS' 14" x 3" EA SHORT SIDE &
(10) 'SDS' 14" x 3" EA CORNER)
(E) GLB PER PLAN(N) BM PER PLAN W/
HGR PER PLAN, WO
10d @ 6" OC
ALONG BM
CONT STL MOUNTING FRAME
LINE OF MECH UNIT
PERP TO ROOF BEAM
1806-03-PP24 - S-301 - 321" = 1'-0"
(E) SUBPURLIN W/
(E) HGR, WO
112"
MIN TYP
(E) GLB PER PLAN
CONT STL MOUNTING FRAME
LINE OF MECH UNIT
EQUIPMENT SUPPORT PARALLEL TO ROOF BEAM
1806-03-PP24 - S-301 - 331" = 1'-0"
SEE MECH DWGS FOR ANCHORAGE
(MIN (12) 'SDS' 14" x 3" EA LONG SIDE
& (5) 'SDS' 14" x 3" EA SHORT SIDE &
(10) 'SDS' 14" x 3" EA CORNER)
(E) PLY SHTG TO
REMAIN, DO NOT CUT10d @ 6" OC
ALONG BM
1 12"
MIN TYP
(N) BM PER PLAN W/
(N) HGR PER PLAN, WO
(E) SUBPURLIN W/
(E) HGR, WO
NOTE:
WHERE (E) BEAM DOES NOT ALIGN W/ MECH
UNIT, A (N) BEAM IN THE CORRECT POSITION
WILL NEED TO BE INSTALLED PER PLAN
OPENING
CONT STL MOUNTING FRAME
LINE OF MECH UNIT
EQUIPMENT SUPPORT PARALLEL TO ROOF BEAM
1806-03-PP24 - S-301 - 341" = 1'-0"
SEE MECH DWGS FOR ANCHORAGE
(MIN (12) 'SDS' 14" x 3" EA LONG SIDE
& (5) 'SDS' 14" x 3" EA SHORT SIDE &
(10) 'SDS' 14" x 3" EA CORNER)
1 12"
MIN TYP
(E) SUBPURLIN W/
(E) HGR, WO
(E) GLB PER PLAN
(E) PLY SHTG TO
REMAIN, DO NOT CUT10d @ 6" OC
ALONG BM
NOTE:
WHERE (E) BEAM DOES NOT ALIGN W/ MECH
UNIT, A (N) BEAM IN THE CORRECT POSITION
WILL NEED TO BE INSTALLED PER PLAN
10d @ 6" OC
ALONG BM
(N) BM PER PLAN W/
HGR EA END PER PLAN
(E) SUBPURLIN WO
W/ (N) 'HU' HGR
(E) PLY SHTG TO REMAIN,
OK TO CUT @ (N) OPNG,
SEE DETAIL 15/- FOR
ADDL INFO
NAILING SCHEDULE
1806-03-PS24 -S301 - 12NTS
FASTENING SCHEDULE
PER 2022 CBC 2304.10.1
CONNECTIONFASTENINGLOCATION
1. BLOCKING BETWEEN CEILING JOISTS, RAFTERS OR TRUSSES TO TOP PLATE OR OTHER FRAMING BELOW3-8d COMMONEACH END, TOENAIL
2. BLOCKING BETWEEN RAFTERS OR TRUSS NOT AT THE WALL TO TOP PLATE, TO RAFTER OR TRUSS 2-8d COMMONEACH END, TOENAIL
2-16d COMMONEND NAIL
3. FLAT BLOCKING TO TRUSS AND WEB FILLER16d COMMON @ 6" OCFACE NAIL
4. CEILING JOIST TO TOP PLATE3-8d COMMONEACH JOIST, TOENAIL
5. CEILING JOIST NOT ATTACHED TO PARALLEL RAFTER, LAPS OVER PARTITIONS3-16d COMMONFACE NAIL
6. CEILING JOIST ATTACHED TO PARALLEL RAFTER (HEEL JOINT)3-16d COMMONFACE NAIL
7. COLLAR TIE TO RAFTER3-10d COMMONFACE NAIL
8. RAFTER OR ROOF TRUSS TO PLATE3-10d COMMONTOENAILb
9. ROOF RAFTER TO RIDGE VALLEY OR HIP RAFTER; OR ROOF RAFTER TO 2-INCH RIDGE BEAM 2-16d COMMONEND NAIL
3-10d COMMONTOENAIL
10. STUD TO STUD AND ABUTTING STUDS AT INTERSECTING WALL CORNERS16d COMMON16" OC FACE NAIL
11. BUILT-UP HEADER (2" TO 2" HEADER)16d COMMON16" OC EACH EDGE, FACE NAIL
12. CONTINUOUS HEADER TO STUD4-10d COMMONTOENAIL
13. TOP PLATE TO TOP PLATE16d COMMON16" OC FACE NAIL
14. TOP PLATE TO TOP PLATE, AT END JOINTS8-16d COMMON
EACH SIDE OF END JOINT, FACE NAIL
(MINIMUM 24" LAP SPLICE LENGTH EACH SIDE
OF END JOINT)
15. BOTTOM PLATE TO JOIST, RIM JOIST, BAND JOIST OR BLOCKING2-16d COMMON16" OC FACE NAIL
16. STUD TO TOP OR BOTTOM PLATE
4-8d COMMONTOENAIL
2-16d COMMONEND NAIL
17. TOP PLATES, LAPS AT CORNERS AND INTERSECTIONS2-16d COMMONFACE NAIL
18. JOIST TO SILL, TOP PLATE, OR GIRDER3-8d COMMONTOENAIL
20. RIM JOIST, BAND JOIST, OR BLOCKING TO TOP PLATE, SILL OR OTHER FRAMING BELOW8d COMMON6" OC, TOENAIL
21. 1"x6" SUBFLOOR OR LESS TO EACH JOIST2-8d COMMONFACE NAIL
22. 2" SUBFLOOR TO JOIST OR GIRDER2-16d COMMONFACE NAIL
23. BUILT-UP GIRDER AND BEAMS, 2" LUMBER LAYERS20d COMMON (4" x 0.192")32" OC FACE NAIL AT TOP AND BOTTOM
STAGGERED ON APPOSITE SIDE
24. LEDGER STRIP SUPPORTING JOIST OR RAFTERS3-16d COMMONEACH JOIST OR RAFTER, FACE NAIL
26. JOIST TO BAND JOIST OR RIM JOIST3-16d COMMONEND NAIL
27. BRIDGING OR BLOCKING TO JOIST, RAFTER OR TRUSS2-8d COMMONEACH END, TOENAIL NOTES:
a. THIS NAILING SCHEDULE SHALL ONLY BE USED IF CONDITION IS NOT OTHERWISE DETAILED OR SPECIFIED ON THE CONSTRUCTION DOCUMENTS. COMMON NAILS SHALL BE USED EXCEPT WHERE
OTHERWISE STATED
b. WHERE A RAFTER IS FASTENED TO AN ADJACENT PARALLEL CEILING JOIST IN ACCORDANCE WITH THIS SCHEDULE AND THE CEILING JOIST IS FASTENED TO THE TOP PLATE IN ACCORDANCE WITH THIS
SCHEDULE, THE NUMBER OF TOENAILS IN THE RAFTER SHALL BE PERMITTED TO BE REDUCED BY ONE NAIL
SAWN LUMBER AND RAFTER JOIST NOTCHING AND BORING LIMITATIONS 1806-03-PS24 -S301 - 13NTS
L/3 L/3
D/4
MAX
LENGTH (L)
DEPTH, (D)
D/6
MAX
D/3
MAX
2"
2" MIN
T&B, TYP
NOTES:
1. NOTCHING AND BORING NOT PERMITTED IN THE SAME JOIST CROSS SECTION WITHOUT STRUCTURAL ENGINEER'S APPROVAL.
2. NOTCH WIDTHS GREATER THAN SHOWN IN TABLE NOT PERMITTED WITHOUT STRUCTURAL ENGINEER'S APPROVAL.
3. NO NOTCHES OR HOLES PERMITTED ANYWHERE IN CANTILEVERED ELEMENTS WITHOUT STRUCTURAL ENGINEER'S APPROVAL.
4. SPACING BETWEEN PENETRATIONS SHALL BE THE GREATER OF 2 TIMES THE LARGEST HOLE DIAMETER OR 2"
NOTCH AND HOLE LIMITATIONS
JOIST SIZEMAX HOLEMAX NOTCH DEPTH MAX END NOTCH MAX NOTCH LENGTH 2X4NONENONENONENONE
2X61 12"78"1 38"1 12"
2X82 38"1 14"1 78"2 38"
2X103"1 12"2 38"3"
2X123 34"1 78"2 78"3 34"
TAPER NOTCH IN LIEU OF SQUARE
CUT TO REDUCE IMPACT
D/3
MAX
NO NOTCHING PERMITTED
IN SHADED REGION
BOTTOM NOTCHES NOT
PERMITTED AT MEMBERS
4X AND LARGER
D/4
MAX
D/3
MAX
1 1
1 1
D/6
MAX
BORINGS ACCEPTABLE IN
HATCHED REGION
D/3
MIN
SEE
NOTE 4
31 12 32 42 62
33 43 53
14 34 44 54 64
15 25 35 45 55 65
6313
52 41 6151
ROOF FRAMING
DETAILS
S-301
ISSUE FOR BID
N:\1800\1806-03-ps24-goleta-city-hall-ti\structural\ConDocs\sheet-files\_goletahall-ti\1806-03-PS24 -S301.dwg, S301, May 08, 2026 2:11pm, jdlong
PROJECT MANAGER
DRAWN BY
PROJECT NUMBER
CHECKED BY
SHEET
MAY 13, 2026
1806-03-PS24
DATE
NO.REVISIONDATE
CONSULTANT
GOLETA CITY HALL
130 CREMONA DRIVE, GOLETA CA 93117
RRM DESIGN GROUP COPYRIGHT 2026.
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
AGENCY
C. PRESSLER
M. DOREMUS
M. DOREMUS
15 CONSULTANT
AGENCY
NO.REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
INITIAL SUBMITTAL
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DR, GOLETA CA 93117
5/09/25
REG I STERED
PRO
FE
SS
IONAL
ENGINEER
BRI AN
P.
S
TARRETT
STATE
OFCAL
IFORNIA
ME
C
H
A
N
IC
A
L
EXP. 6/30/26
M 34068
BY 3C Engineering, Inc., ALL COMMON LAW COPYRIGHT AND OTHER
PROPERTY RIGHTS RESERVE THIS DOCUMENT AS AN ORIGINAL AND UNPUBLISHED WORK PRODUCT. THIS WORK SHALL NOT BE
DUPLICATED, COPIED, DISCLOSED OR USED IN CONNECTION WITH
ANY WORK OR PROJECT OTHER THAN THE SPECIFIC PROJECT FOR
WHICH IT AS BEEN PREPARED, NOR SHALL IT BE ASSIGNED TO ANY
THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN CONSENT OF VISUAL CONTACT. THIS DOCUMENT SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.
S:\ENG Projects\Goleta City Hall AC-11&13 Replacement\Engineering\Goleta City Hall AC-11,13 Replacement Mechanical Plan.dwg MQaddoura778E Aug 22,2025-2:26pm 1806-03-PS24
DS
KHBS
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
GENERAL
M-000
MECHANICAL GENERAL NOTES
1COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING CODES:
2022 CALIFORNIA ADMINISTRATIVE CODE (CAC): PART 1, TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR)
2022 CALIFORNIA BUILDING CODE (CBC): PART 2, TITLE 24 CCR 2022 CALIFORNIA ELECTRICAL CODE (CEC): PART 3, TITLE 24 CCR 2022 CALIFORNIA MECHANICAL CODE (CMC): PART 4, TITLE 24 CCR 2022 CALIFORNIA PLUMBING CODE (CPC): PART 5, TITLE 24 CCR 2022 CALIFORNIA ENERGY CODE (CENC): PART 6, TITLE 24 CCR 2022 CALIFORNIA FIRE CODE (CFC): PART 9, TITLE 24 CCR
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CAL GREEN): PART 11, TITLE 24 CCR REPORT DEFICIENCIES WITHIN THIRTY (30) DAYS UPON AUTHORIZATION TO PROCEED. 2THESE DRAWINGS ARE A GENERAL GRAPHIC PRESENTATION OF THE WORK. DUCTWORK, PIPING, AND EQUIPMENT, AS SHOWN, ARE SCHEMATIC. FABRICATE AND INSTALL BASED ON ACTUAL FIELD MEASUREMENT. COORDINATE WITH OTHER TRADES. ADHERE TO LOCATIONS AS CLOSELY AS
POSSIBLE, VARY RUNS OR SHAPE OF DUCTWORK AS REQUIRED TO MEET STRUCTURAL AND OTHER INTERFERENCES AS REQUIRED BY THE ARCHITECT. MAINTAIN AN UP TO DATE SET OF AS-BUILT DRAWINGS AT THE JOB SITE.
3THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL ITEMS RELATED TO MECHANICAL SYSTEMS
WITH THE WORK OF OTHER TRADES BEFORE PROCEEDING WITH PROCURING OR FABRICATION OF EQUIPMENT, DUCTWORK, PIPING ETC. ITEMS TO BE COORDINATED SHALL INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:
CONSTRUCTION OF PLATFORMS AND SHAPED RUNNERS OR OTHER MEANS TO MOUNT CURBS LEVEL.
ALL PLATFORMS AND CURBS SHALL BE LEVEL UNLESS OTHERWISE NOTED OR DETAILED ON THE MECHANICAL PLANS.
4REVIEW ALL DRAWINGS AND SPECIFICATIONS INCLUDING ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, PLUMBING, AND ELECTRICAL. ANY QUESTIONS SHALL BE BROUGHT UP, IN WRITING, TO THE ATTENTION OF THE ENGINEER BEFORE THE START OF CONSTRUCTION. 5ALL EQUIPMENT SHALL BE INSTALLED WITH SUFFICIENT ACCESS TO CONTROLS, FILTERS, ELECTRIC MOTORS, ETC. ACCESS CLEARANCE SHALL BE 30" OR AS REQUIRED BY THE EQUIPMENT MANUFACTURER, WHICH EVER IS GREATER. CONTRACTORS SHALL PROVIDE ACCESS PANELS WHERE REQUIRED. WHERE VERTICAL SPACE ALLOWS, INSTALL DUCTWORK THAT IS IN CLOSE PROXIMITY TO
MECHANICAL, ELECTRICAL OR ANY OTHER ITEM THAT REQUIRES ACCESS HIGH IN THE SPACE FOR EASE OF ACCESS.
6HANDLE, STORE AND INSTALL EQUIPMENT PER MANUFACTURER'S INSTRUCTIONS. 7BRACE AND SUPPORT PIPES, CONDUIT, AND DUCTWORK IN ACCORDANCE TO SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL AND PLUMBING PIPING SYSTEM. 8ALL DUCT DIMENSIONS, AS SHOWN ON MECHANICAL DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
INCREASE OUTER DUCT DIMENSION AS REQUIRED TO ACCOUNT FOR THE THICKNESS OF INTERNAL LINING WHERE APPLICABLE.
9ALL SQUARE ELBOWS IN SUPPLY DUCTWORK SHALL HAVE TURNING VANES. PROVIDE MANUAL VOLUME DAMPER AT EACH BRANCH DUCT TAKE-OFF SERVING EACH AIR TERMINAL DEVICE. PROVIDE BALANCING
DAMPERS FOR EACH MAIN DUCT TAKE-OFF IN ACCORDANCE TO SMACNA IN ORDER TO ASSURE A COMPLETELY BALANCED SYSTEM.
10CONTROLS AND SWITCHES INTENDED TO BE USED BY THE OCCUPANT OF A ROOM OR AREA TO
CONTROL COOLING, HEATING AND VENTILATING EQUIPMENT SHALL BE MOUNTED AT THE HEIGHTS GIVEN BY SECTION 11B-308.1 OF THE 2022 CBC. NOTIFY THE ARCHITECT IMMEDIATELY IF THE MOUNTING HEIGHTS REQUIRED BY THE 2022 CBC CANNOT BE OBTAINED AT THE LOCATION WHERE THE CONTROL DEVICE IS SHOWN ON THE MECHANICAL FLOOR PLANS.
11DUCT SMOKE DETECTORS WHEN NOT PROVIDED PRE-INSTALLED BY THE EQUIPMENT MANUFACTURER
SHALL BE INSTALLED IN THE SUPPLY AIR DUCT OF AIR-MOVING SYSTEMS SUPPLYING AIR IN EXCESS OF 2000 CFM. DETECTORS SHALL BE LOCATED BETWEEN THE SUPPLY AIR DUCT CONNECTION AT THE EQUIPMENT AND THE FIRST BRANCH DUCT OR DIFFUSER. WHERE FIRE-DETECTION OR ALARM SYSTEMS
ARE PROVIDED FOR THE BUILDING, ALL SMOKE DETECTORS SHALL BE SUPERVISED BY SUCH SYSTEMS IN AN APPROVED MANNER, AND INSTALLED IN ACCORDANCE WITH NFPA 72 AND THE CALIFORNIA BUILDING AND FIRE CODES.
12ALL EQUIPMENT SHALL BE LABELED AS TO THE SPACE THEY ARE SERVING. 13MATERIALS EXPOSED WITHIN ANY SPACE BEING USED AS AN AIR PLENUM SHALL BE NON COMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX NOT GREATER THAN 25 AND A SMOKE DEVELOPED INDEX NOT GREATER THAN 50, WHEN TESTED AS A COMPOSITE PRODUCT IN ACCORDANCE WITH ONE OF THE FOLLOWING TEST METHODS: NFPA 255, METHOD OF TEST OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, ASTM E84, SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, OR UL 723, TEST FOR SURFACE BURNING CHARACTERISTIC OF BUILDING MATERIALS. 14ANY MECHANICAL EQUIPMENT THAT PROVIDES POWER TO A ENERGIZED ACCESSORY MUST BE
PROVIDED WITH A NAMEPLATE THAT REFLECTS THE ELECTRICAL CHARACTERISTICS OF THE COMPLETE SYSTEM AS INSTALLED WITH THE ENERGIZED ACCESSORY. NO EXCEPTIONS. 15EQUIPMENT WITH REFRIGERANT ACCESS PORTS LOCATED OUTDOORS IN AN AREA THAT IS NOT
SECURED BY WALLS OR FENCING REQUIRING KEY ACCESS SHALL BE PROTECTED FROM WITH LOCKING-TYPE TAMPER RESISTANT CAPS.
CAL GREEN CODE NONRESIDENTIAL MANDATORY
MEASURES
5.410.4.5 OPERATION AND MAINTENANCE (O&M) MANUAL. PROVIDE THE BUILDING OWNER OR
REPRESENTATIVE WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR EACH SYSTEM. O&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8, SECTION 5142, AND OTHER RELATED REGULATIONS.
5.410.4.5.1 INSPECTIONS AND REPORTS. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY THE ENFORCING AGENCY.
5.504.3 COVERING OF DUCT OPENINGS AND PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE CONSTRUCTION SITE
UNTIL FINAL STARTUP OF THE HEATING, COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER
RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL
OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER THE SYSTEM.
5.504.4.1 ADHESIVES, SEALANTS AND CAULKS. ADHESIVES, SEALANTS, AND CAULKS USED ON THE PROJECT SHALL MEET THE REQUIREMENTS OF THE FOLLOWING STANDARDS:
1. ADHESIVES, ADHESIVE BONDING PRIMERS, ADHESIVE PRIMERS, SEALANTS, SEALANT PRIMERS AND
CAULKS SHALL COMPLY WITH LOCAL OR REGIONAL AIR POLLUTION CONTROL OR AIR QUALITY MANAGEMENT DISTRICT RULES WHERE APPLICABLE, OR SCAQMD RULE 1168 VOC LIMITS, AS SHOWN IN TABLES 5.504.4.1 AND 5.504.4.2. SUCH PRODUCTS ALSO SHALL COMPLY WITH THE RULE 1168 PROHIBITION ON THE USE OF
CERTAIN TOXIC COMPOUNDS (CHLOROFORM, ETHYLENE DICHLORIDE, METHYLENE CHLORIDE,
PERCHLOROETHYLENE AND TRICHLOROETHYLENE), EXCEPT FOR AEROSOL PRODUCTS AS SPECIFIED IN SUBSECTION 2, BELOW.
2. AEROSOL ADHESIVES, AND SMALLER UNIT SIZES OF ADHESIVES, AND SEALANT OR CAULKING COMPOUNDS (IN UNITS OF PRODUCT, LESS PACKAGING, WHICH DO NOT WEIGH MORE THAN ONE POUND AND DO NOT CONSIST OF MORE THAN 16 FLUID OUNCES) SHALL COMPLY WITH STATEWIDE VOC STANDARDS AND OTHER
REQUIREMENTS, INCLUDING PROHIBITIONS ON USE OF CERTAIN TOXIC COMPOUNDS, OF CALIFORNIA CODE OF REGULATIONS, TITLE 17, COMMENCING WITH SECTION 94507.
TABLE 5.504.4.1 ADHESIVE VOC LIMIT
LESS WATER AND LESS EXEMPT COMPOUNDS IN GRAMS PER LITER
SPECIALTY APPLICATIONS CURRENT VOC LIMIT PVC WELDING 510 CPVC WELDING 490 ABS WELDING 325 SPECIAL PURPOSE CONTACT ADHESIVE 250
1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER THE ADHESIVE WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED.
2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168, HTTP://WWW.ARB.CA.GOV/DRDB/SC/CURHTML/R1168.PDF.
5.504.5.3 FILTERS. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF
THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13 FILTERS SHALL BE INSTALLED PRIOR TO
OCCUPANCY, AND RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL. FILTERS SHALL BE CLEARLY LABELED BY THE MANUFACTURER INDICATING THE MERV RATING.
EXCEPTIONS:
1. EXISTING MECHANICAL EQUIPMENT.
SECTION 5.506 INDOOR AIR QUALITY
5.506.1 OUTSIDE AIR DELIVERY. FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN BUILDINGS, MEET THE MINIMUM REQUIREMENTS OF SECTION 120.1 (REQUIREMENTS FOR VENTILATION) OF THE 2022
CALIFORNIA ENERGY CODE, OR THE APPLICABLE LOCAL CODE, WHICHEVER IS MORE STRINGENT, AND DIVISION 1, CHAPTER 4 OF CCR, TITLE 8.
SECTION 5.508 OUTDOOR AIR QUALITY
5.508.1 OZONE DEPLETION AND GREENHOUSE GAS REDUCTIONS. INSTALLATIONS OF HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL COMPLY WITH SECTIONS 5.508.1.1 AND 5.508.1.2.
5.508.1.1 CHLOROFLUOROCARBONS (CFCS). INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT DO NOT CONTAIN CFCS.
5.508.1.2 HALONS. INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT DO NOT CONTAIN HALONS.
SECTION 702.1 INSTALLER TRAINING
HVAC SYSTEM INSTALLERS SHALL BE TRAINED AND CERTIFIED IN THE PROPER INSTALLATION OF HVAC
SYSTEMS INCLUDING DUCTS AND EQUIPMENT BY A NATIONALLY OR REGIONALLY RECOGNIZED TRAINING OR CERTIFICATION PROGRAM. UNCERTIFIED PERSONS MAY PERFORM HVAC INSTALLATIONS WHEN UNDER THE
DIRECT SUPERVISION AND RESPONSIBILITY OF A PERSON TRAINED AND CERTIFIED TO INSTALL HVAC SYSTEMS OR CONTRACTOR LICENSED TO INSTALL HVAC SYSTEMS. EXAMPLES OF ACCEPTABLE HVAC
TRAINING AND CERTIFICATION PROGRAMS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:
1. STATE CERTIFIED APPRENTICESHIP PROGRAMS.
2. PUBLIC UTILITY TRAINING PROGRAMS.
3. TRAINING PROGRAMS SPONSORED BY TRADE, LABOR OR STATE-WIDE ENERGY CONSULTING OR VERIFICATION ORGANIZATIONS.
4. PROGRAMS SPONSORED BY MANUFACTURING ORGANIZATIONS.
5. OTHER PROGRAMS ACCEPTABLE TO THE ENFORCING AGENCY
MECHANICAL TITLE 24 NOTES
1HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE LATEST REQUIREMENTS OF THE CA ENERGY EFFICIENCY STANDARDS.
2HVAC SYSTEMS SHALL MEET THE LATEST CONTROL REQUIREMENTS OF THE CA ENERGY EFFICIENCY STANDARDS.
3ALL WORK SHALL BE IN ACCORDANCE WITH CITY AND COUNTY CODES, CALIFORNIA ENERGY CONSERVATION STANDARDS, TITLE - 24, AND ALL OTHER APPLICABLE CODES.
MECHANICAL LEGEND
SYMBOLABBREVIATIONDESCRIPTION
ØDIA DIAMETER
ɸELECTRICAL PHASE
ROUND DUCT TURNING DOWN, ROUND DUCT TURNING
UP
ACCESS CLEARANCE
POC OR PODPOINT OF CONNECTION, POINT OF DISCONNECTION
ITEMS RELATED TO THE MECHANICAL SYSTEMS THAT
ARE TO BE REMOVED
CONDENSATE LINE
GAS LINE
MECHANICAL ABBREVIATIONS
ACAIR CONDITION, AIR CONDITIONING, AIR
CONDITIONEDHP HORSE POWER
ABV ABOVEHVI HOME VENTILATING INSTITUTE
AFF ABOVE FINISHED FLOORHZ HERTZ
AFUEANNUAL FUEL UTILIZATION EFFICIENCYIDUINDOOR UNIT
AHJAUTHORITY HAVING JURISDICTIONIWC INCHES OF WATER COLUMN
AHUAIR HANDLING UNITKW KILOWATT
ALUM ALUMINUMLBS POUNDS
AMCAAIR MOVEMENT AND CONTROL
ASSOCIATIONLWT LEAVING WATER TEMPERATURE
AMB AMBIENTMBH 1000 BRITISH THERMAL UNITS PER HOUR
AP ACCESS PANELMCA MINIMUM CIRCUIT AMPS
ARCHARCHITECT, ARCHITECTURALMFGR MANUFACTURE OR MANUFACTURER
AHRIAIR CONDITIONING, HEATING, AND
REFRIGERATION INSTITUTEMINMINIMUM
ASHRAE
AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AND AIR CONDITIONING
ENGINEERS
MUA MAKE-UP AIR
BDD BACK DRAFT DAMPER(N)NEW
BOD BASIS OF DESIGNNLNOT LISTED
BELBELOWNOM NOMINAL
BHPBRAKE HORSE POWERNTSNOT TO SCALE
BLDG BUILDINGOA OUTSIDE AIR
BTUHBRITISH THERMAL UNIT PER HOUROAI OUTSIDE AIR INTAKE
CACOMBUSTION AIROBD OPPOSED BLADE DAMPER
CDCONDENSATE DRAINODU OUTDOOR UNIT
CFD CEILING FIRE DAMPEROSHPDOFFICE OF STATEWIDE HEALTH PLANNING
AND DEVELOPMENT
CFM CUBIC FEET PER MINUTEPD PRESSURE DROP
CONT CONTINUATIONPSIPOUNDS PER SQUARE INCH
CSD CEILING SMOKE DAMPERRARETURN AIR
DBDRY BULB TEMPERATUREREFREFRIGERANT, REFRIGERATION
DN DOWNRM ROOM
DSA DIVISION OF THE STATE ARCHITECT RPM REVOLUTIONS PER MINUTE
DTR DOWN THROUGH ROOFSA SUPPLY AIR
(E)EXISTINGSEER SEASONAL ENERGY EFFICIENCY RATION
EA EXHAUST AIRSHT SHEET
EC EVAPORATIVE COOLERSMACNASHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
EDB ENTERING DRY BULB TEMPERATURE SOV SHUT OFF VALVE
EER ENERGY EFFICIENCY RATIOSP STATIC PRESSURE
EFF EFFICIENCYSS STAINLESS STEEL
ELEC ELECTRICALSSE STEADY STATE EFFICIENCY
ESP EXTERNAL STATIC PRESSURESST SATURATED SUCTION TEMPERATURE
EWB ENTERING WET BULBTEMPTEMPORARY, TEMPERATURE
EWT ENTERING WATER TEMPERATURETSP TOTAL STATIC PRESSURE
FA FROM ABOVETYP TYPICAL
FC FLEXIBLE CONNECTIONTXV THERMAL EXPANSION VALVE
FD FIRE DAMPERUON UNLESS OTHERWISE NOTED
FLA FULL LOAD AMPSUTRUP TO OR UP THROUGH ROOF
FPMFEET PER MINUTEVD VOLUME DAMPER
FSC FAN SPEED CONTROLLERVEX VEHICLE EXHAUST SYSTEM
FSD FIRE/SMOKE DAMPERVRF VARIABLE REFRIGERANT VOLUME
GAGAGE, GAUGEWBWET BULB TEMPERATURE
GALV GALVANIZEDWC WATER COLUMN
GPM GALLONS PER MINUTEWG WATER GAUGE
GYP GYPSUMWT WEIGHT EXPRESSED IN POUNDS
HD HEAD
CD
G
PROJECT TEAM LIST
TITLENAMEDESK NUMBEREMAIL ADDRESS
PRINCIPAL IN CHARGE BRIAN [email protected] PROJECT MANAGER DENVER [email protected] MECHANICAL DESIGNER DENVER [email protected]
SHEET INDEX
SHEET NUMBERSHEET TITLE
M-000GENERAL
M-001SCHEDULES & DETAILS
M-121PARTIAL ROOF PLANS
AUGUST 25, 2025
PLAN CHECK RESPONSE 1
16 REF.
PF
REF.
1 1
A
A
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
B
B
C
C
D
D
E
E
F
F
G
G
W.H
DMB
W.
ELEC. PANELS
ELECTRICAL PANELS
ELEC. PANELS
CONFERENCE
SERVER
OFFICE
OFFICE
OFFICE
RECEPTION
LOBBY
MEN
WOMEN
COPY/PRINT
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
CONFERENCE
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICEOFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
BREAK
OFFICE
OFFICE
OPEN OFFICE
OPEN OFFICE
FILE STORAGE
OPEN OFFICE
PHP
11 ON
ROOF
PHP
13 ON
ROOF
PHP-11T
REF.
UP
UP
UP
1 1
A
A
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
B
B
C
C
D
D
E
E
F
F
G
G
ELEC. PANELS
ELEC. PANELS
SHOWER
SHOWER
LOCKERS
LOCKERS
PLANNING &
BUILDING LOBBY
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
COORIDOR
MEN
WOMEN
LOBBY
RECEPTION
STORAGE
OPEN OFFICE
OFFICEOFFICEOFFICE
OFFICEOFFICE
OFFICE
BREAK RM.
OFFICE
OPEN OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE OFFICE OFFICE
OPEN OFFICE
CONFERENCE
BREAK AREA
OFFICE
OFFICE
OFFICE
HALL
STOR.
CLO.
LOBBY
COUNCIL CHAMBERS
SERVER STOR.
SERVER RM.
ELECTRICAL
VESTIBULE
CONFERENCE
CLO.
STORAGE
CORRIDOR
COPY / PRINT
OFFICE
OFFICE ARMORY
BREAK ROOM
CONFERENCE
OFFICE
OFFICE OFFICE
STORAGE
WAREHOUSE
ELEC. / STORAGE
STAIR
STAIR
CLO.
CLO.
OFFICE
ELEC. PANELS
W.H
ELECTRICAL
PHP-13
T
CONSULTANT
AGENCY
NO. REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
INITIAL SUBMITTAL
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DR, GOLETA CA 93117
5/09/25
REG I STERED
PRO
FE
SS
IONAL
ENGINEER
BRI AN
P.
S
TARRETT
STATE
OFCAL
IFORNIA
ME
C
H
A
N
IC
A
L
EXP. 6/30/26
M 34068
BY 3C Engineering, Inc., ALL COMMON LAW COPYRIGHT AND OTHER
PROPERTY RIGHTS RESERVE THIS DOCUMENT AS AN ORIGINAL AND UNPUBLISHED WORK PRODUCT. THIS WORK SHALL NOT BE
DUPLICATED, COPIED, DISCLOSED OR USED IN CONNECTION WITH
ANY WORK OR PROJECT OTHER THAN THE SPECIFIC PROJECT FOR
WHICH IT AS BEEN PREPARED, NOR SHALL IT BE ASSIGNED TO ANY
THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN CONSENT OF VISUAL CONTACT. THIS DOCUMENT SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.
S:\ENG Projects\Goleta City Hall AC-11&13 Replacement\Engineering\Goleta City Hall AC-11,13 Replacement Mechanical Plan.dwg MQaddoura778E Aug 22,2025-2:26pm 1806-03-PS24
DS
KHBS
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
SCHEDULES & DETAILS
M-001
EXISTING GAS HEATING ELECTRIC COOLING PACKAGED UNIT SCHEDULE (FOR REFERENCE ONLY)
TAG MAKE MODEL
NOM
CAPACITY
TONS
DUCT
CONFIGURATIONREFRIGERANTCOOLING
STAGES
CONDENSATE
CONNECTION
SIZE
ELECTRICAL DATA AHRI RATINGSEVAPORATOR FAN DATAFURNACE SECTIONMERV 13 FILTER
QUANTITY
AND SIZE
WEIGHT W/
ACCESSORIES
LBS
WEIGHT W/
ACCESSORIES
& CURB
LBS
POWER
V/ɸ/HZMCAFUSE
SIZEBTUHEER
[EER2]DRIVE
CFM
ESPWATTS
[HP]BHPFAN
SPEED
HEATING
STAGES
INPUT
BTUH
OUTPUT
BTUH
THERMAL
EFFICIENCY
[AFUE] HIGH LOW
CARRIER 48HJD0087.5VERTICAL R-410A23/4"460/3/60 19.2 2590,00011.00 BELT3,000NA1.42,6152.90 NA290,000 72,900[82] (4)16x20x2870NA CARRIER48HJD012 10.0VERTICALR-410A23/4"460/3/6024.9 30120,00011.00BELT4,000NA2.03,3754.20NA 2120,000 98,400[82](4)20x20x21,035NA GENERAL NOTES APPLICABLE TO ALL UNITS:
A. EQUIPMENT IS EXISTING AND IS TO BE REMOVED AND REPLACED. DATA GIVEN FOR REFERENCE ONLY. (E)AC
11 (E)AC
13 PACKAGED HEAT PUMP UNIT SCHEDULE
TAG MAKE MODEL
NOM
CAPACITY
TONS
DUCT
CONFIGURATIONREFRIGERANT
ELECTRICAL DATA
AHRI PERFORMANCE
AUXILIARY ELECTRIC HEATCONDENSATE
CONNECTION
SIZE
EVAPORATOR FAN DATAMERV 13
FILTER
QUANTITY
AND SIZE
VENTILATION AIR
BALANCE
REQUIREMENTS
CFM
WEIGHT W/
ACCESSORIES
LBS
WEIGHT W/
ACCESSORIES
& CURB LBS
REMARKS
SEE BELOW
INSTALLATION
DETAIL COOLINGHEATING
POWER
V/ɸ/HZMCAFUSE
SIZE BTUHSEER
[SEER2]
EER
[EER2]IEERBTUH
AT 47°F
BTUH
AT 17°F
COP AT
47°F
HSPF
[HSPF2]KWBTUHDRIVEMIN
CFM
MAX
CFMESP BHPFAN
SPEEDCONTROLMINIMUM
OAI
DCV MAX
OAI
CARRIER50FEQM087.5VERTICALR-454B460/3/60424590,000NA 11.20 15.084,000 45,0003.4 NA 13.847,0873/4"DIRECT1,980 3,0001.0 1.51,6092-STAGE(4)20x20x2650 NA1,020 1,4701,2,C1,C41/M001 CARRIER50FEQM1210.0VERTICALR-454B460/3/6052 60118,000NA11.00 15.0112,000 64,0003.4NA13.847,0873/4"DIRECT2,640 4,0000.90 2.341,8822-STAGE(4)20x20x2550NA1,235 1,6801,3,C1,C41/M001 GENERAL NOTES APPLICABLE TO ALL UNITS:
A. DISCONNECT PROVIDED BY ELECTRICAL CONTRACTOR.
B. PACKAGED HEAT PUMP UNITS THAT PROVIDE POWER FROM THE UNIT TO ANY ENERGIZED ACCESSORY SHALL BE PROVIDED WITH A FACTORY NAMEPLATE THAT REFLECTS THE ELECTRICAL CHARACTERISTICS OF THE COMPLETE SYSTEM. NO EXCEPTIONS.
C. PROVIDE WITH MICROMETL CRBV-SRT34HA-11 STRUCTURALLY CALCULATED SPRING ISOLATION CURB. 11" BASE HEIGHT.
D. PROVIDE WITH CSFM LISTED, FACTORY INSTALLED SMOKE DETECTOR LOCATED IN THE SUPPLY AIR COMPARTMENT. DETECTOR SHALL BE WIRED TO SHUTDOWN THE UNIT IMMEDIATELY UPON SMOKE DETECTION.
E. PROVIDE WITH SINGLE POINT POWER KIT.
CONTROL NOTES:
C1. PROVIDE WITH HONEYWELL MODEL TC500A NETWORKABLE PROGRAMMABLE THERMOSTAT. INSTALL THERMOSTAT AT THE LOCATION OF THE (E)THERMOSTAT BUT AT 48" AFF AS REQUIRED TO MEET ACCESSIBILITY REQUIRMENTS. EXTEND CONTROL WIRING AS NEEDED. UTILIZE THE ELECTRICAL BOX THE EXISTING THERMOSTAT IS MOUNTED ON AS A JUNCTION BOX TO SPLICE THE WIRING. PROVIDE COVER PLATE OVER EXISTING BOX. COLOR OF COVER PLATE TO MATCH ADJACENT EXISTING COVER PLATES.
PHP
11 PHP
13 COMBINATION ECONOMIZER AND POWER EXHAUST SCHEDULE
TAGMATCHING
UNIT TAGMAKEMODEL
ELECTRICAL DATAFAN DATA
WEIGHT
LBS
REMARKS
SEE BELOW
INSTALLATION
DETAIL POWER
V/ɸ/HZFLA MCA MOCP
POWERED BY
ASSOCIATED
UNIT
CFM ESP TYPE MODULATING
MICROMETL PEBD-SRT34CB-D2DH 460/3/604.6 5.8 10NO3,0000.5BACKWARD INCLINEDYES195C1,C2,C3NA
MICROMETL PEBD-SRT34CB-D2DH 460/3/605.2 6.5 10NO4,0000.5BACKWARD INCLINEDYES225C1,C2,C3NA
GENERAL NOTES APPLICABLE TO ALL UNITS:
A. UNIT IS PROVIDED WITH A INTEGRAL 20 AMP DISCONNECT.
B. ECONOMIZER SHALL MEET TITLE 24 MANDATORY REQUIREMENTS FOR DAMPER LEAKAGE, FAULT DETECTION AND DIAGNOSTIC CONTROLS.
CONTROL NOTES:
C1. ECONOMIZER SHALL BE DRY BULB CONTROLLED.
C2. ECONOMIZER SHALL BE PROVIDED WITH HONEYWELL JADE CONTROLLER AND BELIMO NON COMMUNICATING ACTUATORS.
C3. POWER EXHAUST SHALL MODULATE TO MAINTAIN 0.05" WC IN THE SPACE SERVED BY THE MATCHING UNIT.
PE
11 PHP
11 PE
13 PHP
13 AC UNIT (1,235 LBS
MAX)
BASE RAIL INTEGRAL TO AC UNIT
14 GAUGE HOLD DOWN ATTACH TO CURB
WITH (4)#12X12" TEK SCREWS. INSTALL
SCREWS THRU PRE DRILLED HOLES(TYP
EACH HOLD DOWN, (10) TOTAL)
ATTACH HOLD DOWN TO UNIT WITH (4)
#12X112" TEK SCREWS. INSTALL SCREWS
THRU PRE DRILLED HOLES. (TYP EACH
HOLD DOWN, (10) TOTAL)
GASKET ALL AROUND
TUBE STEEL INTEGRAL TO CURB
2" DEFLECTION OSHPD PRE-APPROVED
RESTRAINED SPRING ISOLATOR (OPA-0070)
NAILER INTEGRAL TO CURB
24 GAUGE COUNTER FLASHING
SINGLE PLY ROOFING PER ARCHITECTURAL
RIGID INSULATION
NTS 1
PLYWOOD DECK PER STRUCTURAL
REFER TO ARCHITECTURAL FOR ROOFING
AND FLASHING REQUIREMENTS
LOCATE HOLD DOWN CLIPS PER THE CURB
MANUFACTURERS REQUIREMENTS
PHPs-11,13 SPRING ISOLATION CURB
(E)STRUCTURE OR (N)BLOCKING
BEYOND, REFER TO STRUCTURAL
DRAWINGS
BLOCKING PER STRUCTURAL
SECURE CURB TO BLOCKING WITH
(74)1/4X3" SIMPSON SDS WITH
WASHER, CENTERED ON CURB
FLANGE. PROVIDE (12) EA LONG SIDE
(5) EA SHORT SIDE AND (10) EA
CORNER. LOCATE SDS PER THE CURB
MANUFACTURERS REQUIREMENTS
NTS
UNIT CONDENSATE DRAIN2
OPEN VENT
NEOPRENE HOSE-SAME
SIZE AS COND. DRAIN.
(TYP OF 2)
STAINLESS STEEL HOSE CLAMP
(TYP)
ROOF MOUNTED COOLING UNIT
ALL CONDENSATE PIPING
SHALL BE TYPE L COPPER
AS RECOMMENDED BY
UNIT MFGR., MIN OF 3"
AS RECOMMENDED BY
UNIT MFGR., MIN OF
4"-MAX OF 8"
3/4" CONDENSATE DRAIN
SEE PLAN FOR
CONTINUATION
NTS 3
DURA-BLOK #DBM SERIES
PIPE SUPPORT FOR
SINGLE PIPE SUPPORT.
PIPE, SEE PLANS FOR SIZE
ROOF STRUCTURE
HINGED PIPE CLAMP
SINGLE PIPE SUPPORT - ROOF
1SECOND FLOOR PLAN
SCALE: 1/16" = 1'-0"
2FIRST FLOOR PLAN
SCALE: 1/16" = 1'-0"
AUGUST 25, 2025
PLAN CHECK RESPONSE 1
17 (E)AC
13 (E)AC
11 CD
CD
G G
CD
G
G G
CD
G
CD CD
POD
(E)3/4"
(E)ROOF
RECEPTOR TO
REMAIN
(E)3/4"
POD
POD
POD
1 1
3 4
4 3
2 2
B
C
D
E
1 2
3 1
2 3
B
C
D
E
PHP
11 PE
11 PHP
13 PE
13 CD
CD
G G
CD
G
GG
CD CD
(E)3/4"
(E)ROOF
RECEPTOR TO
REMAIN
(E)3/4"
POC
POC
3 CD
1 2
2 OAI
OAI
3 3/4" CD1
3/4"
CONSULTANT
AGENCY
NO. REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
INITIAL SUBMITTAL
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DR, GOLETA CA 93117
5/09/25
REG I STERED
PRO
FE
SS
IONAL
ENGINEER
BRI AN
P.
S
TARRETT
STATE
OFCAL
IFORNIA
ME
C
H
A
N
IC
A
L
EXP. 6/30/26
M 34068
BY 3C Engineering, Inc., ALL COMMON LAW COPYRIGHT AND OTHER
PROPERTY RIGHTS RESERVE THIS DOCUMENT AS AN ORIGINAL AND UNPUBLISHED WORK PRODUCT. THIS WORK SHALL NOT BE
DUPLICATED, COPIED, DISCLOSED OR USED IN CONNECTION WITH
ANY WORK OR PROJECT OTHER THAN THE SPECIFIC PROJECT FOR
WHICH IT AS BEEN PREPARED, NOR SHALL IT BE ASSIGNED TO ANY
THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN CONSENT OF VISUAL CONTACT. THIS DOCUMENT SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.
S:\ENG Projects\Goleta City Hall AC-11&13 Replacement\Engineering\Goleta City Hall AC-11,13 Replacement Mechanical Plan.dwg MQaddoura778E Aug 22,2025-2:26pm 1806-03-PS24
DS
KHBS
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
PARTIAL ROOF PLANS
M-121
KEY NOTES
APPLICABLE TO THIS SHEET ONLY
3/4" CD TO PHP. REFER TO DETAIL 2/M-001 FOR CONNECTION TO UNIT.
REFER TO DETAIL 3/M-001 FOR SUPPORT.
(E)3/4" CD. PROVIDE NEW SUPPORTS. REFER TO DETAIL 3/M001.
PROVIDE NEW DROP/RISER FROM THE PHP TO BELOW THE ROOF DECK.
RECONFIGURE DUCTWORK BELOW ROOF AS REQUIRED TO CONNECT TO THE NEW DROP/RISER.
CONTRACTOR SHALL VERIFY EXTENT OF THE RECONFIGURATION OF THE DUCTWORK BELOW THE ROOF DECK PRIOR TO BIDDING THE PROJECT.
CONTRACTOR SHALL SUBMITT A SKETCH INDICATING HOW THEY INTEND TO RECONFIGURE THE DUCTWORK WITH THEIR BID.
HVAC GENERAL NOTES
APPLICABLE TO THIS SHEET ONLY
1 ALL EXISTING ITEMS SHOWN ON THE PLANS HAS BEEN COLLECTED FROM THE BEST AVAILABLE RESOURCES. ACCURACY AND LOCATION OF EXISTING ITEMS MAY NOT BE ACCURATE.
1 2
3 2PARTIAL DEMOLITION ROOF PLAN
SCALE: 1/4" = 1' 0"1PARTIAL ROOF PLAN
SCALE: 1/4" = 1' 0"
DEMOLITION KEY NOTES
APPLICABLE TO THIS SHEET ONLY
AC UNIT TO BE REMOVED. DISCONNECT FROM POWER, CONTROL WIRING, GAS AND CONDENSATE. REMOVE UNIT AND ROOF CURB. CONTROL
WIRING TO REMAIN.
GAS PIPING TO BE REMOVED. CAP PIPE AT POD. REMOVE PIPE AND ALL ASSOCIATED SUPPORTS TO POD.
CONDENSATE PIPING TO BE REMOVED. REMOVE PIPE AND ALL
ASSOCIATED SUPPORTS TO POD.
CONDENSATE PIPING TO REMAIN. SUPPORTS SHALL BE REMOVED AND REPLACED.
DEMOLITION GENERAL NOTES
APPLICABLE TO THIS SHEET ONLY
1 ALL EXISTING ITEMS SHOWN HAVE BEEN COLLECTED FROM THE BEST AVAILABLE SOURCES. THE ENGINEER DOES NOT REPRESENT THE
ACCURACY OF THESE ITEMS. THE CONTRACTOR SHALL CAREFULLY
EXAMINE THE SITE AND THE CONTRACT DOCUMENTS AND PERFORM ALL
WORK WHICH MAY BE REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
1 2
3 4
DEMOLITION PLAN STATEMENT
THIS DEMOLITION PLAN WAS PREPARED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER DOES NOT REPRESENT THAT ALL ITEMS WHICH MAY REQUIRE DEMOLITION HAVE BEEN SHOWN. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLY EXAMINE THE SITE AND
THE CONTRACT DOCUMENTS AND TO PERFORM ALL DEMOLITION AND
RECONSTRUCTION WHICH MAY BE REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. DISPOSE REMOVED ITEMS PER THE CITY OF GOLETA MUNICIPAL CODE IN CHAPTER 8.10, ARTICLE IV, MANDATORY RECYCLING OF CONSTRUCTION DEBRIS.
ALL EXISTING ITEMS SHOWN ON THE PLANS HAS BEEN COLLECTED FROM THE BEST AVAILABLE RESOURCES. ACCURACY AND LOCATION OF EXISTING ITEMS MAY NOT BE ACCURATE.
START UP AND BALANCING
AFTER COMPLETION OF THE INSTALLATION OF THE NEW PACKAGED HEAT PUMPS AND COMBINATION
ECONOMIZER AND MODULATING POWER EXHAUST THE CONTRACTOR SHALL STARTUP THE EQUIPMENT FOLLOWING THE MANUFACTURERS STARTUP PROCEDURES AND CHECKLIST. PROVIDE COMPLETED START UP CHECKLIST TO THE OWNER.
OVERALL SYSTEM AIRFLOW SHALL BE BALANCED TO ENSURE THE EQUIPMENT IS OPERATING AT THE SPECIFIED SUPPLY, RETURN AND OUTSIDE AIRFLOW VALUES. REFER TO THE PACKAGED HEAT PUMP SCHEDULE FOR THE SUPPLY AND VENTILATION AIRFLOW RATES.
AUGUST 25, 2025
PLAN CHECK RESPONSE 1
18 CONSULTANT
AGENCY
NO.REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
INITIAL SUBMITTAL
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DR, GOLETA CA 93117
5/09/25
REG I STERED
PRO
FE
SS
IONAL
ENGINEER
BRI AN
P.
S
TARRETT
STATE
OFCAL
IFORNIA
ME
C
H
A
N
IC
A
L
EXP. 6/30/26
M 34068
BY 3C Engineering, Inc., ALL COMMON LAW COPYRIGHT AND OTHER
PROPERTY RIGHTS RESERVE THIS DOCUMENT AS AN ORIGINAL AND UNPUBLISHED WORK PRODUCT. THIS WORK SHALL NOT BE
DUPLICATED, COPIED, DISCLOSED OR USED IN CONNECTION WITH
ANY WORK OR PROJECT OTHER THAN THE SPECIFIC PROJECT FOR
WHICH IT AS BEEN PREPARED, NOR SHALL IT BE ASSIGNED TO ANY
THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN CONSENT OF VISUAL CONTACT. THIS DOCUMENT SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.
S:\ENG Projects\Goleta City Hall AC-11&13 Replacement\Engineering\Goleta City Hall AC-11&13 Replacement T24.dwg MQaddoura778E Aug 22,2025-2:27pm 1806-03-PS24
DS
KHBS
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS. rrmdesign.com | (805) 543-1794
ENERGY COMPLIANCE
DOCUMENTATION
EC-000
PROJECT TEAM LIST
TITLENAMEDESK NUMBEREMAIL ADDRESS
PRINCIPAL IN CHARGE BRIAN [email protected] PROJECT MANAGER DENVER [email protected] MECHANICAL DESIGNER DENVER [email protected] ENERGY COMPLIANCE JORGE BRAVO805.540.3363 EXT [email protected]
SHEET INDEX
SHEET NUMBERSHEET TITLE
M-000GENERAL
M-001SCHEDULES & DETAILS
M-121PARTIAL ROOF PLANS
EC-000ENERGY COMPLIANCE DOCUMENTATION
AUGUST 25, 2025
PLAN CHECK RESPONSE 1
19 rrmdesign.com |(805) 543-1794
CONSULTANT
AGENCY
NO.REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
EXPIRES: 09/30/26
E
RE
T
Y
M.
E
CF
NO. 20823EL
TS
O
E
AT E
SIGER
EJ F
T
FR
E
ARO L
IC
RT
IL
F CA
AIN
HOM
N
A
REE GI N
ORPD
NA
OI
EF
SS
L
San Luis Obispo, CA 93406
P.O. Box 1167 - 3562 Empleo St.
THOMA ELECTRIC, INC.
Phone: (805) 543-3850
[email protected]
Fax: (805) 543-3829
MAY 21, 2026
1806-03-PS24
TR/CJ
CJ
CJ/JT
THOMA: 24-8129.05
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
ISSUE FOR BID
GENERAL NOTES, LEGND,
AND ABBREVIATIONS
E-001
GENERAL NOTES
1. CODE COMPLIANCE: ALL WORK SHALL CONFORM TO AND BE PERFORMED IN ACCORDANCE WITH CODES, STANDARDS, AND
ORDINANCES AS SET FORTH BY THE AUTHORITIES HAVING JURISDICTION AND THEIR LATEST ADOPTED EDITIONS (IN EFFECT AT TIME OF BUILDING PERMIT APPLICATION) OF THE FOLLOWING PUBLICATIONS:
A. CALIFORNIA CODE OF REGULATIONS TITLE 24; INCLUDES 2019 CALIFORNIA ELECTRICAL CODE, 2019 CALIFORNIA FIRE CODE, 2019 CALIFORNIA BUILDING CODE, ETC. WITH LOCAL AMENDMENTS AS APPLICABLE.
B. AMERICANS WITH DISABILITIES ACT (ADA).
2. SAFETY: THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL EQUIPMENT IN A SAFE AND RESPONSIBLE MANNER.
KEEP DEAD FRONT EQUIPMENT IN PLACE WHILE EQUIPMENT IS ENERGIZED. CONDUCT ALL CONSTRUCTION OPERATIONS IN A SAFE MANNER FOR EMPLOYEES AS WELL AS OTHER WORKPERSONS OR ANYONE VISITING THE JOB SITE. PROVIDE BARRIERS, FLAGS, TAPE, ETC. AS REQUIRED FOR SAFETY. THE CONTRACTOR SHALL HOLD ALL PARTIES HARMLESS OF NEGLIGENT SAFETY PRACTICES, WHICH MAY CAUSE INJURY TO OTHERS ON OR NEAR THE JOB SITE.
3. FIRE RATED ASSEMBLIES SHALL MAINTAIN RATINGS AS SPECIFIED IN THE CALIFORNIA BUILDING CODE CHAPTER 7.
CONTRACTOR SHALL PROVIDE AND INSTALL PHYSICAL ENCLOSURE AROUND FIXTURES, PANELS, ETC. AS REQUIRED. ALL
ASSEMBLIES TO BE PENETRATED SHALL BE INSTALLED WITH APPLICABLE THROUGH-PENETRATION FIRESTOP SYSTEM AS DETERMINED BY UL CLASSIFICATION. BEFORE CONSTRUCTION, VERIFY AND COMPLY WITH REQUIREMENTS OF LOCAL AUTHORITY HAVING JURISDICTION.
4. MOUNTING HEIGHTS SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED:
+15" AFF: RECEPTACLES, TELEPHONE, TV & DATA OUTLETS. (MEASURED BOTTOM OF OUTLET BOX) +46" AFF: OUTLET ABOVE COUNTER (MEAUSRED TOP OF OUTLET BOX) +48" AFF: LIGHT SWITCHES. (MEASURED TOP OF OUTLET BOX)
+48" AFF: FIRE ALARM MANUAL PULL STATIONS, T-STATS. (MEASURED TOP OF OUTLET BOX) THE LOWER OF +80" AFF TO BOTTOM OF LENS, OR 6" BELOW CEILING: FIRE ALARM VISUALS.
ELECTRICAL SWITCHES: CONTROLS AND SWITCHES INTENDED TO BE USED BY THE OCCUPANT OF THE ROOM OR AREA TO
CONTROL LIGHT AND RECEPTACLE OUTLETS, APPLIANCES OR COOLING, HEATING AND VENTILATING EQUIPMENT, SHALL BE LOCATED NO MORE THAN 48 INCHES MEASURED FROM THE TOP OF THE OUTLET BOX NOR LESS THAN 15 INCHES MEASURED FROM THE BOTTOM OF THE OUTLET BOX TO THE LEVEL OF THE FINISH FLOOR OR WORKING PLATFORM. [CBC 11B-308.1.1] ELECTRICAL RECEPTACLE OUTLETS: ELECTRICAL RECEPTACLE OUTLETS ON BRANCH CIRCUITS OF 30 AMPERES OR LESS AND COMMUNICATION SYSTEM RECEPTACLES SHALL BE LOCATED NO MORE THAN 48 INCHES MEASURED FROM THE TOP OF THE RECEPTACLE OUTLET BOX OR RECEPTACLE HOUSING NOR LESS THAN 15 INCHES MEASURED FROM THE BOTTOM OF THE RECEPTACLE OUTLET BOX OR RECEPTACLE HOUSING TO THE LEVEL OF THE FINISH FLOOR OR WORKING PLATFORM [CBC 11B-308.1.2]
BEFORE ROUGH-IN, VERIFY ALL MOUNTING HEIGHTS AND EXACT LOCATIONS FOR ALL EQUIPMENT ELECTRICAL CONNECTIONS, STUB-UPS, RECEPTACLES, OUTLETS, ETC. WITH ARCHITECT OR OWNER. PLACE DEVICES LOCATED ABOVE COUNTERS, SHELVING, ETC. AND IN BATHROOMS SO AS NOT TO CONFLICT WITH EDGES OF WAINSCOTING, COUNTER SPLASH, SHELVING, ETC. ARCHITECTURAL SHEETS SHALL GOVERN.
4. LABEL PANELS, CABINETS, BACKBOARDS, MAIN DEVICES, SAFETY SWITCHES, CONTACTORS AND OTHER SPECIFICALLY DESIGNATED EQUIPMENT SHOWN ON PLANS. USE ENGRAVED LAMINATED PLASTIC NAMEPLATES ATTACHED BY SCREWS OR RIVETS. FOR FEEDERS, NEATLY AND INDELIBLY LABEL CONDUIT DESTINATIONS ON BOTH VISIBLE ENDS OF CONDUIT RUNS
WHERE CONDUITS TERMINATE AT DESIGNATED ENCLOSURES, STRUCTURES OR EQUIPMENT (INCLUDING PULL AND SPLICE BOXES).
5. EQUIPMENT ANCHORAGE NOTE
ALL MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE ANCHORED OR BRACED TO MEET THE HORIZONTAL AND VERTICAL FORCES PRESCRIBED IN THE 2019 CBC, SECTIONS 1613A AND 1616A AND ASCE 7-10 SECTIONS 13.3, 13.4 & 13.6.
THE ATTACHMENT OF THE FOLLOWING ITEMS SHALL BE DESIGNED TO RESIST THE FORCES PRESCRIBED ABOVE, BUT NEED NOT BE DETAILED ON THE PLANS PER 2019 CBC SECTION 1616A.1.18:
A. FURNITURE(EXCEPT STORAGE CABINETS AS NOTED IN 2019 CBC TABLE 13.5-1) B. TEMPORARY OR MOVABLE EQUIPMENT WITH EXCEPTIONS NOTED IN 2019 CBC SECTION 1616A.1.18 ITEM 2.
C. ARCHITECTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS IN SEISMIC DESIGN CATEGORIES D, E, OR F THAT MEET ALL OF THE CRITERIA LISTED IN 2019 SECTION 1616A.1.18 ITEM 3.
D. EQUIPMENT WEIGHING LESS THAN 20 POUNDS SUPPORTED BY VIBRATION ISOLATORS.
E. EQUIPMENT WEIGHING LESS THAN 20 POUNDS SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL
FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE MECHANICAL/ELECTRICAL ENGINEER.
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO RESIST THE FORCES PRESCRIBED IN ASCE 7-10 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.8, 13.6.7, AND 13.6.5.5, ITEM 6, RESPECTIVELY.
THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL COMPLY WITH ONE OF THE OSHPD PRE-APPROVALS WITH AN OPA#, SUCH AS MASON INDUSTRIES (OPA 349), OR ISAT (OPA 485) AS MODIFIED TO SATISFY ANCHORAGE REQUIREMENTS OF ACI 318, APPENDIX D.
COPIES OF THE MANUAL SHALL BE ON THE JOBSITE PRIOR TO STARTING HANGING AND BRACING OF THE PIPE, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS.
THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS.
MECHANICAL SYSTEMS
1. MECHANICAL UNIT CONDUITS: TO PREVENT DAMAGE DUE TO VIBRATION, BOTH POWER AND CONTROL WIRING CONDUITS
FEEDING EXTERIOR MECHANICAL UNITS SHALL BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR WITH LIQUID TIGHT
FLEXIBLE TYPE AT FINAL CONNECTION TO UNIT AND BETWEEN ROOF JACK AND DISCONNECT SWITCH WHERE DISCONNECT IS MOUNTED ON UNIT.
2. POWER EXHAUST FANS SHALL BE PROVIDED & INSTALLED BY MECHANICAL CONTRACTOR WITH LINE VOLTAGE WIRING CONNECTIONS MADE BY ELECTRICAL CONTRACTOR.
3. MECHANICAL EQUIPMENT CONTROLS: MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LOW VOLTAGE WIRE AND CONNECTIONS (BELOW 120 VOLT) TO AND FROM ALL MECHANICAL CONTROL DEVICES. ALL LOW VOLTAGE CONTROL WIRE SHALL BE IN CONDUIT, UNLESS OTHERWISE NOTED.
4. PULLROPES: ANY RACEWAY WITHOUT CABLE OR WIRE SHALL BE INSTALLED WITH MINIMUM 200 POUND TEST PULL LINE AND LARGER IF REQUIRED BY SERVING UTILITY COMPANY. ANY NEW OR EXISTING COMMUNICATION OR SIGNAL RACEWAY ROUTED
BETWEEN BUILDINGS, SIGNAL CABINETS, AND/OR SIGNAL CLOSETS WITH FUTURE CAPACITY SHALL BE INSTALLED WITH MINIMUM 200 POUND TEST PULL LINE AS WELL AS THE CALLED FOR CABLE.
EXISTING BUILDINGS
1. ASBESTOS: IF DURING THE COURSE OF WORK THE CONTRACTOR OBSERVES THE EXISTENCE OF ASBESTOS, OR
ASBESTOS-BEARING MATERIALS, THE CONTRACTOR SHALL IMMEDIATELY TERMINATE FURTHER WORK ON THE PROJECT AND NOTIFY THE OWNER OF THE CONDITION. THE OWNER WILL, AFTER CONSULTATION WITH THE OWNER'S REPRESENTATIVE, DETERMINE A FURTHER COURSE OF ACTION.
2. ANY DEMOLITION WORK SHOWN WAS PREPARED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER DOES NOT REPRESENT THAT ALL ITEMS WHICH MAY REQUIRE DEMOLITION HAVE BEEN SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO CAREFULLY EXAMINE THE SITE AND THE CONTRACT DOCUMENTS AND TO PERFORM ALL DEMOLITION AND RECONSTRUCTION WHICH MAY BE REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
3. EXISTING CONDITIONS: INFORMATION SHOWN FOR EXISTING CONDITIONS WAS PRIMARILY GAINED FROM "AS BUILT" DRAWINGS AND/OR LIMITED FIELD INVESTIGATION. BEFORE BID, VISIT SITE TO VERIFY EXISTING CONDITIONS AND MAKE ALLOWANCE FOR VARIATIONS FROM THAT SHOWN.
4 EXISTING CONDUCTORS: INTERCEPT, EXTEND, REROUTE, REPULL CONDUCTORS, SPLICE AND OTHERWISE MODIFY EXISTING
CONDUCTORS OF ALL SYSTEMS AS REQUIRED TO MAINTAIN AND/OR ESTABLISH PROPER FUNCTION AND SATISFY DESIGN INTENT. REMOVE ABANDONED CONDUCTORS.
5. EXISTING COMMUNICATIONS, DATA AND CATV AND OTHER LOW VOLTAGE TYPE SYSTEM OUTLET LOCATIONS SHOWN ON THE PLAN TO BE RELOCATED SHALL BE PERFORMED BY THE ELECTRICAL CONTRACTOR. MODIFY EXISTING SYSTEM AS REQUIRED FOR FULL FUNCTION (SAME AS EXISTING) IN NEW LOCATION.
6. WHERE EXISTING BUILDING CONSTRUCTION, MECHANICAL UNITS AND OTHER EQUIPMENT IS SHOWN TO BE REMOVED, DISCONNECT AND REMOVE ALL ASSOCIATED ELECTRICAL INSTALLATION.
7. CLOSELY COORDINATE OUTAGE AND FACILITY DISRUPTION TIME WITH ARCHITECT AND OWNER. MINIMUM 72-HOUR NOTICE IS REQUIRED BEFORE ANY CIRCUIT SHUTDOWN OR DISRUPTION OF FACILITY PERSONNEL FUNCTIONING.
ELECTRICAL ROOF PLAN
1. PROVIDE SEALTITE POWER & CONTROL CONNECTIONS TO ALL AC UNITS.
2. ALL EQUIPMENT SHOWN ABOVE ROOF IS NEMA 3R.
3. VERIFY EXACT EQUIPMENT LOCATIONS AND POINTS OF CONNECTION WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.
4. FUSE DISCONNECT SWITCHES PER EQUIPMENT NAMEPLATE RATING.
5. ALL ROOF PENETRATIONS SHALL BE MADE WITH ROOF JACKS, SEAL ALL PENETRATIONS WITH MASTIC.
FIRE ALARM SYSTEM
A. EXISTING FIRE ALARM IS A SILENT NIGHT. FIRE ALARM WILL BE A DEFERRED SUBMITTAL AFTER BUILDING PERMIT IS ISSUED.
APPROVAL AND DEVICES SHOWN ON PLANS ARE FOR REFERENCE ONLY. SUBMIT FULL DESIGN-BUILD SHOP DRAWINGS SHALL
BE PREPARED BY THE CONTRACTOR AND PERMIT APPLICATION TO THE COUNTY BUREAU OF FIRE PREVENTION FOR REVIEW AND APPROVAL OF FIRE ALARM SYSTEM. INCLUDE THE PLAN CHECK NUMBER ON YOUR SUBMITTAL AND ALL CORRESPONDENCE. INSTALLATION OF THE FIRE ALARM SYSTEM SHALL NOT BEGIN UNTIL THE LOCAL FIRE AUTHORITY HAS
APPROVED THE SHOP DRAWINGS
DUCT SMOKE DETECTORD SD
SD
HORN- AUDIBLE DEVICE
VISUAL- VISUAL DEVICE
MANUAL PULL STATION
END OF LINE RESISTOR
HEAT DETECTOR
SMOKE DETECTOR
B
H
BELL
P
AUDIBLE/VISUAL
FLOW SWITCH
TAMPER SWITCH
F
AV
T
H
V
(R)
UC
UG
UON
(TBR)
TYP
NIC
NL
P POLE
MSB
MTTB
(N) NEW
ABBREVIATIONS
AMPERE
AMP FUSE RATING
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
AMPERES INTERRUPT CAPACITY
AMP SWITCH RATING
BELOW FINISH GRADE
CIRCUIT BREAKER
CIRCUIT
CONDUIT
EXISTING
ELECTRICAL CONTRACTOR
EXHAUST FAN
CA. ELECTRICAL CODE
(E) IN (N) LOCATION
(E) TO BE (R)
FIRE ALARM
FIRE ALARM CONTROL PANEL
GROUNDING CONDUCTOR
GENERAL CONTRACTOR
GROUND
GALVANIZED RIGID STEEL
MECHANICAL CONTRACTOR
ISOLATED GROUND
GANGED WITH SWITCH
MAIN CIRCUIT BREAKER
LIGHTING
MAIN LUGS ONLY
FUTURE
GROUND FAULT CKT INTERRUPTER
(E) POWER HOMERUN
POWER/COMM.
SINGLE RECEPT.
DUPLEX RECEPT.
DUPLEX- HALF SWITCHED
DOUBLE DUPLEX
SPECIAL CONFIGURATION
DUPLEX- FLOOR OUTLET
LETTER ADJACENT INDICATES
FIXTURE TYPE
A
RECESSED FLUOR.
SURFACE FLUOR.
FLUOR. STRIP UON
TRACK LIGHT
DIRECTIONAL FLOOD
EXIT LIGHT- WALL
EMERGENCY FIXTURE
POLE LIGHT
POLE LIGHT- DECORATIVE
TANDEM-WIRED LAMPS
(ARROW INDICATES DIRECTION)
EXIT LIGHT- CEILING
BOLLARD
FA 2DPST
OCCUPANCY SENSOR
W/THERMAL OVERLOAD
DUAL LEVEL SWITCHING
SWITCHLEG DESIGNATION
PW/PILOT LIGHT
KEY OPERATED
,a
OS
K
3-WAY
4-WAY
DIMMER
TIMER SWITCH
D
T
3 4
MC
MCB
MLO
IG
GWS
LTG
GFI
GND
GRS
G
FACP
GC
CONDUIT STUB (W/MARKER)
VERTICAL CONDUIT RUN
FLEXIBLE CONNECTION
SURFACEMOUNT RACEWAY
SWITCHES
SPST
CONDUIT SEAL
LOW VOLTAGE
LV
(E)
(EXN)
(EXR)
(F)
EC
EF-#
CEC
CKT
C
AS
BFG
CB
NOTE: INTERPRET IN CONTEXT
LIGHT FIXTURES
CEILING SURFACEMOUNT
WALL SURFACEMOUNT
RECESSED DOWNLIGHT
RECESSED WALLWASH
LEGEND
PENDANT MOUNT
NEW POWER HOMERUN
(3 HOTS & NEUT SHOWN)
EXISTING TO REMAIN
CONDUIT/WIRE
ISOLATED GROUND
E
NEW
AFF
AFG
AIC
A
AF
UNDERGROUND
PHONE/DATA COMBO OUTLET
GROUND FAULT CIRCUIT INTERRUPTGFI
MOUNTED ABOVE COUNTER*
MOUNTED ABOVE COUNTER*
FIRE ALARM CONTROL PANEL
REMOTE POWER SUPPLY
RPS
CONDUIT ONLYC.O.
PV PHOTOVOLTAIC
FIRE ALARM
JJUNCTION BOX
MAIN SWITCHBOARD
NOT IN CONTRACT
NIGHT LIGHT
RELOCATE(D)
TO BE REMOVED
TYPICAL
UNDERCABINET
UNDERGROUND
VOLT AMPERES
WATT, WIRE
WEATHERPROOF (NEMA 3R)
UNLESS OTHERWISE NOTED
MAIN TELEPHONE TERMINAL BOARD
FUSIBLE SWITCH
Ø
GROUND
PHASE
TELEPHONE OUTLET
DATA OUTLET
SAFETY DISCONNECT
TELEVISION OUTLET
MISCELLANEOUS
CIRCUIT BREAKER
THERMOSTATT
MOTOR
TV
VOLT V
WP
VA
W
SPEAKER/VISUALSV
INTERMEDIATE DISTRIBUTION FRAMEIDF
MAIN DISTRIBUTION FRAMEMDF
SMOKE/CO DETECTORSDCO
ACCESS POINTAP
DOUBLE DUPLEX, HALF SWITCHED
SHEET LIST
SHEETNAME
E-001ELECTRICAL GENERAL NOTES, LEGEND, AND ABBREVIATION E-011ELECTRICAL SINGLE LINE DIAGRAM
E-101ELECTRICAL ROOF PLAN
E-201ELECTRICAL FIRST FLOOR PLAN
E-202ELECTRICAL SECOND FLOOR PLAN
CONVENTIONS
X
-
1 NUMBERED SHEET NOTES: REFERS TO
NOTES ON SAME SHEET AS REFERENCED
DETAIL REFERENCE:
-DETAIL DESIGNATION
-SHEET NUMBER REFERENCE
UNIT
#
HVAC EQUIPMENT NEW TAG PER
MECHANICAL PLANS
(AC-X)EXISTING UNIT TAG
20 rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
EXPIRES: 09/30/26
E
RE
T
Y
M.
E
CF
NO. 20823EL
TS
O
E
AT E
SIGER
EJ F
T
FR
E
ARO L
IC
RT
IL
F CA
AIN
HOM
N
A
REE GI N
ORPD
NA
OI
EF
SS
L
San Luis Obispo, CA 93406
P.O. Box 1167 - 3562 Empleo St.
THOMA ELECTRIC, INC.
Phone: (805) 543-3850
[email protected]
Fax: (805) 543-3829
MAY 21, 2026
1806-03-PS24
TR/CJ
CJ
CJ/JT
THOMA: 24-8129.05
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
ISSUE FOR BID
SINGLE LINE DIAGRAM
E-011
SINGLELINE DIAGRAM
############E-011
1 (E) MAIN SWITCHBOARD "MSB"
1600A, 480/277V, 3ɸ, 4W
MM
TO SCE
PAD-MOUNTED
TRANSFORMER
600A
3P
600A
3P
(E) DBD1
600A, 480/277V, 3ɸ, 4W
200A
3P
100A
3P
HD1B
PANEL
HD1A
PANEL
400A
3P
(E) T1
225KVA
480-208Y/120V,
3ɸ, 4W
100A
3P
(E) T2
45KVA
480-240V,
3ɸ, 3W
(E) DBD2
600A, 208Y/120V, 3ɸ, 4W
100A
3P
125A
3P
LD1A
PANEL
100A
3P
LD1D
PANEL
125A
3P
LD1C
PANEL
90A
3P
LD1B
PANEL
30A
3P
COMP
AC
COMP
AC
ISO XFMR
45KVA
240-208Y/120V,
3ɸ, 4W
AC DISCONNECT
125A
(E) BD
600A, 480/277V, 3ɸ, 4W
200A
3P
200A
3P
HB
PANEL
HA
PANEL
400A
3P
(E) T1
150KVA
480-120/208V,
3ɸ, 4W
(E) DB2
600A, 208Y/120V, 3ɸ, 4W
100A
3P
100A
3P
LA
PANEL
60A
3P
LE
PANEL
100A
3P
LC
PANEL
100A
3P
CP1
PANEL
90A
3P
LB
PANEL
CP2
PANEL
(E) HM
100A, 480/277V
, 3ɸ, 4W
M
30A
3P
(E) TD
15KVA
480-120/240V,
3ɸ, 4W
PANEL
HPD
50A
3P
METER #
259000-044522
FIRST FLOOR
METER #
259000-094069
2ND FLOOR
METER #
256000-086626
METER #
256000-060253
100AS
100AF
PANEL
HLD
480/277V, 3ɸ, 4W
M
FROM SCE
100A
3P
LD
PANEL
600A
3P
PANEL
CP
125A
3P
400AS
400AF
(E) PV PANEL
400A, 480/277V, 3ɸ, 4W
100A
3P
100A
3P
INV1INV2
15A
3P
100A
3P
INV3
G
65KAIC
3P
1200A
ATS1
600A, 480V
AT2
600A, 480V
GCP
PANEL
METER LABELLED HEWLETT PACKARD, SUITE "A". ASSUMED
THAT THIS IS THE PV VIRTUAL METERING.
SOLAR AT CARPORT
(E) (E)
AC-13
CONNECTED
TO THIS PANEL
AC-11
CONNECTED
TO THIS PANEL
1PLANCHECK RESPONSE 1 8/15/2025
21 PF
1 1
AA
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
BB
CC
DD
EE
FF
GG
CD
AC-14
20A
480V
CP2-3,5
50A
208V
CP2-4,6
50A
208V
AC-18
30A
480V
AC-20
LD-1,3
20A
208V
AC-16
HB-14,16,18
20A
480V
AC-15
HA-31,33,35
30A
480V
HD1A-19,21,23
AC-17
HA-32,34,36
30A
480VEF-2
LB-41
EF-3
LD1A-34
AC-12
HD1A-26,28,30
20A
480V
460V, 3ɸ
42 MCA
45A
AC-10
HA-26,28,30
30A
480V
AC-7
HD1A-14,16,18
30A
480V
AC-4
LB-5,7
30A
208V
LB-13,15
40A
208V
AC-6
AC-2
LB-9,11
30A
208V
HD1A-37,39,41
20A
480V
CU-3
EF-1
LB-39
AC-8
LB-1,3
20A
208V
AC-9
HA-37,39,41
30A
480V
AC-5
HD1A-20,22,24
20A
480V
AC-3
HA-25,27,29
20A
480V
AC-1
HA-19,21,23
20A
480V
CU-1
HD1A-31,33,35
20A
480V
HD1A-32,34,36
20A
480V
CU-2
STUB UP
LB-17
UNLABELED
-OFF-
OUT OF
COMISSION
STUB UP
LB-17
PHOTOCELL
PC
PHOTOCELL
PC
(N)
(AC-13)
(AC-11)
HA-20,22,24
460V, 3ɸ
4.6 FLA,
5.6 MCA
460V, 3ɸ
52 MCA
60A
460V, 3ɸ
5.2 FLA,
6.5MCA
PHP
11 PE
11 (E)
(E)
(E)
(E)
(E)
(E)
(E) (E) (E) (E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
1 2
PHP
13 (N)
PE
13 3
4 6
6 7
7 7
7 SDD
5 SDD
5 J
J
8 8
CU-4
LD1C-9,11
30A
208V
STUB UP
LD-9
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
EXPIRES: 09/30/26
E
RE
T
Y
M.
E
CF
NO. 20823EL
TS
O
E
AT E
SIGER
EJ F
T
FR
E
ARO L
IC
RT
IL
F CA
AIN
HOM
N
A
REE GI N
ORPD
NA
OI
EF
SS
L
San Luis Obispo, CA 93406
P.O. Box 1167 - 3562 Empleo St.
THOMA ELECTRIC, INC.
Phone: (805) 543-3850
[email protected]
Fax: (805) 543-3829
MAY 21, 2026
1806-03-PS24
TR/CJ
CJ
CJ/JT
THOMA: 24-8129.05
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
ISSUE FOR BID
ELECTRICAL ROOF PLAN
E-101
ELECTRICAL ROOF PLAN
1/8" = 1'-0"E-101
1 REFERENCE NOTES
1.AC-11 – EXISTING CONDITIONS AND UPGRADE:
*AC-11 IS CURRENTLY CONNECTED TO PANEL HA ON THE SECOND FLOOR VIA AN EXISTING 3/4" HOMERUN CONDUIT SHARED WITH
ANOTHER 3-PHASE CIRCUIT.
*EXISTING WIRING CONSISTS OF (6)#10 CONDUCTORS + #10 CU GROUND.
*THE CONDUIT RUNS TO AN EXISTING J-BOX ABOVE THE CEILING, THEN SPLITS INTO A DEDICATED CONDUIT RUNNING UP THROUGH THE ROOF. *A 3/4" CONDUIT PENETRATES THE ROOF AND TERMINATES IN AN LB FITTING WITH SEAL-TIGHT CONDUIT CONNECTED TO THE DISCONNECT. *REPLACE THE EXISTING 480V, 30A, 3P, NEMA 3R DISCONNECT WITH A NEW 480V, 60A, 3P, NEMA 3R DISCONNECT.
*FIELD-LOCATE AND RE-USE THE EXISTING ROOF PENETRATION.
2.AC-11 – ELECTRICAL UPGRADE:
*REMOVE THE EXISTING (3)#10 CONDUCTORS FROM AC-11.
*INSTALL A NEW HOMERUN TO PANEL HA USING 3/4" CONDUIT WITH (3)#8 AND (1)#10 CU GROUND.
*REPLACE THE EXISTING 30A, 3-POLE BREAKER IN PANEL HA WITH A NEW 480V, 50A, 3-POLE BREAKER, MATCHING THE PANEL RATING AND VOLTAGE REQUIREMENTS.
3.AC-13 – EXISTING CONDITIONS:
*AC-13 IS CONNECTED TO PANEL HD1A ON THE FIRST FLOOR VIA A DEDICATED 3/4" CONDUIT CONTAINING (3)#8 AND (1)#10 CU GROUND. *THE CONDUIT PENETRATES THE ROOF INTO AN LB FITTING.
*FIELD-LOCATE AND RE-USE THE EXISTING ROOF PENETRATION. *REPLACE THE EXISTING 480V, 40A, 3P, NEMA 3R DISCONNECT WITH A NEW 480V, 60A, 3P, NEMA 3R DISCONNECT.
4. AC-13 – CONDUIT AND CONDUCTOR UPGRADE:
*THE EXISTING 3/4" CONDUIT IS UNDERSIZED FOR THE NEW
CONDUCTOR REQUIREMENTS.
*ABANDON AND REMOVE THE EXISTING 3/4" CONDUIT AND DISCONNECT THE CONDUCTORS.
*PROVIDE A NEW 1" CONDUIT HOMERUN WITH (3)#6 AND (1)#8 CU GROUND.
*RE-USE ONE OF THE EXISTING #8 CONDUCTORS AS THE GROUND, WHERE CODE-COMPLIANT.
*PROVIDE A NEW ROOF PENETRATION AS REQUIRED FOR CONDUIT ROUTING.
*REPLACE THE EXISTING 40A, 3-POLE BREAKER IN PANEL HD1A WITH A NEW 480V, 60A, 3-POLE BREAKER, MATCHING THE PANEL RATING AND VOLTAGE REQUIREMENTS.
5. PROVIDE FIRE ALARM CONNECTION TO NEW SMOKE DUCT DETECTOR PER MECHANICAL PLANS. CONNECT TO EXISTING FIRE ALARM SYSTEM.
6. NEW POWER EXHAUST HAS AN INTEGRAL DISCONNECT. PROVIDE SEPARATE CONNECTION FOR NEW AC UNIT.
7. PROPOSED DISCONNECT SHOWN IS FOR REFERENCE ONLY.
COORDINATE WITH UNIT EQUIPMENT FOR EXACT LOCAITON PRIOR TO ROUGH-IN.
8. PROVIDE WP JUNCTION BOX AND 3/4"CONDUIT WITH PULL STRING
DOWN TO SECOND FLOOR ACCESSIBLE CEILING SPACE FOR FUTURE BUILDING ENERGY MANAGEMENT SYSTEM CONTROL WIRING.
22 REF.
UP
UP
UP
1 1
AA
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
BB
CC
DD
EE
FF
GG
ELEC. PANELS
ELEC. PANELS
SHOWER
SHOWER
LOCKERS
LOCKERS
PLANNING &
BUILDING LOBBY
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
COORIDOR
MEN
WOMEN
LOBBY
RECEPTION
STORAGE
OPEN OFFICE
OFFICEOFFICEOFFICE
OFFICEOFFICE
OFFICE
BREAK RM.
OFFICE
OPEN OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE OFFICE OFFICE
OPEN OFFICE
CONFERENCE
BREAK AREA
OFFICE
OFFICE
OFFICE
HALL
STOR.
CLO.
LOBBY
COUNCIL CHAMBERS
SERVER STOR.
SERVER RM.
ELECTRICAL
VESTIBULE
CONFERENCE
CLO.
STORAGE
CORRIDOR
COPY / PRINT
OFFICE
OFFICE ARMORY
BREAK ROOM
CONFERENCE
OFFICE
OFFICE OFFICE
STORAGE
WAREHOUSE
ELEC. / STORAGE
STAIR
STAIR
CLO.
CLO.
OFFICE
ELEC. PANELS
W.H
ELECTRICAL
'DB2'
PANEL
'CP'
(CPE)
PANEL
'HD1A'
XFMR
'T2'
PANEL
'DBD2'
XFMR
'T1'
PANEL
'DBD1'
'BD'
'LE'
XFMR 'TD'
"ATS1"
"ATS2"
'LD1A'
'LD1C'
"MSB"
XFMR 'T1'
HOUSE METER
GENERATOR DISTRIBUTION
PANEL 'GDP'
'HPD'
'HLD'
SERVICE DISCONNECT
'LD1D'
'LD1B'
PHOTOVOLTAIC AC PANELSOLAR
DISCONNECT
SOLAR METER
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
EXPIRES: 09/30/26
E
RE
T
Y
M.
E
CF
NO. 20823EL
TS
O
E
AT E
SIGER
EJ F
T
FR
E
ARO L
IC
RT
IL
F CA
AIN
HOM
N
A
REE GI N
ORPD
NA
OI
EF
SS
L
San Luis Obispo, CA 93406
P.O. Box 1167 - 3562 Empleo St.
THOMA ELECTRIC, INC.
Phone: (805) 543-3850
[email protected]
Fax: (805) 543-3829
MAY 21, 2026
1806-03-PS24
TR/CJ
CJ
CJ/JT
THOMA: 24-8129.05
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
ISSUE FOR BID
ELECTRICAL FIRST
FLOOR PLAN
E-201
ELECTRICAL FIRST FLOOR PLAN
1/8" = 1'-0"E-201
1 REFERENCE NOTES
1. PANEL HD1A CIRCUIT 19/21/23 FEED EXISTING ROOF MOUNTED AC-13.
REPLACE THE EXISTING 40A, 3-POLE BREAKER WITH NEW 480V, 60A, 3-POLE BREAKER, MATCHING THE PANEL RATING AND VOLTAGE
REQUIRMENTS. EXISTING PANEL AND BREAKER IS SQUARE D COMPANY. 1 23
REF.
PF
REF.
1 1
AA
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
BB
CC
DD
EE
FF
GG
W.H
DMB
W.
ELEC. PANELS
ELECTRICAL PANELS
ELEC. PANELS
CONFERENCE
SERVER
OFFICE
OFFICE
OFFICE
RECEPTION
LOBBY
MEN
WOMEN
COPY/PRINT
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
CONFERENCE
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICEOFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
BREAK
OFFICE
OFFICE
OPEN OFFICE
OPEN OFFICE
FILE STORAGE
OPEN OFFICE
'LA' 'LB'
'CP'
'LC'
'LD'
'HA'
'HB'
1 2
'FACP'
rrmdesign.com | (805) 543-1794
CONSULTANT
AGENCY
NO. REVISIONDATE
PROJECT MANAGER
DRAWN BY CHECKED BY
DATE
PROJECT NUMBER
SHEET
RRM DESIGN GROUP COPYRIGHT 2025
RRM IS A CALIFORNIA CORPORATION
THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS
REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN
GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR
USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED
PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS
OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.
EXPIRES: 09/30/26
E
RE
T
Y
M.
E
CF
NO. 20823EL
TS
O
E
AT E
SIGER
EJ F
T
FR
E
ARO L
IC
RT
IL
F CA
AIN
HOM
N
A
REE GI N
ORPD
NA
OI
EF
SS
L
San Luis Obispo, CA 93406
P.O. Box 1167 - 3562 Empleo St.
THOMA ELECTRIC, INC.
Phone: (805) 543-3850
[email protected]
Fax: (805) 543-3829
MAY 21, 2026
1806-03-PS24
TR/CJ
CJ
CJ/JT
THOMA: 24-8129.05
GOLETA CITY HALL - HVAC
REPLACEMENT
130 CREMONA DRIVE, GOLETA CA 93117
ISSUE FOR BID
ELECTRICAL SECOND
FLOOR PLAN
E-202
ELECTRICAL SECOND FLOOR PLAN
1/8" = 1'-0"E-202
1 REFERENCE NOTES
1. EXISTING PANEL HA CIRCUIT 20/22/24 FEED EXISTING ROOF MOUNTED AC-11. REPLACE THE EXISTING 30A, 3-POLE BREAKER WITH NEW 480V, 50A, 3-POLE BREAKER, MATCHING THE PANEL RATING AND VOLTAGE REQUIRMENTS. EXISTING PANEL AND BREAKER IS SQUARE D COMPANY.
2. EXISITING FIRE ALARM SYSTEM. PROVIDE FIRE ALARM CONNECTION TO NEW SMOKE DUCT DETECTORS PER MECHANICAL PLANS.
24 100% CD - IFB 00 01 03-1
DIVISION 00
SECTION 00 01 01
PROJECT TITLE PAGE
PROJECT MANUAL
FOR
GOLETA CITY HALL
HVAC REPLACEMENT PROJECT
130 Cremona Drive, Goleta, CA 93117
PROJECT NUMBER: 9137b
BID NUMBER: 2026-006
DATE: MAY 21, 2026
BID OPENING: JULY 07, 2026 @ 2:00PM
CITY OF GOLETA
130 CREMONA DRIVE
GOLETA, CALIFORNIA 93117
PREPARED BY:
CITY OF GOLETA & RRM DESIGN GROUP
25 100% CD - IFB 00 01 03-2
DIVISION 00
SECTION 00 01 03
PROJECT DIRECTORY
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Identification of project team members and their contact information.
1.02 OWNER:
A. Name: City of Goleta
1. Address Line 1: 130 Cremona Drive, Suite B.
2. City: Goleta.
3. State: CA.
4. Zip Code: 93117.
B. Primary Contact: All correspondence from the Contractor to the Architect will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting.
1. Title: Project Manager, General Services Department.
2. Name: Patrick Zuroske.
3. Email: [email protected]
4. Phone: (805) 568-4154
1.03 CONSULTANTS:
A. Architect: Design Professional of Record. All correspondence from the Contractor regarding construction documents authored by Architect's consultants will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting.
1. Company Name: RRM Design Group
a. Address Line 1: 3765 South Higuera Street, Suite 102 b. City: San Luis Obispo
c. State: CA.
d. Zip Code: 93401
e. Telephone: (805) 543-1794
2. Primary Contact:
a. Title: Architect of Record.
b. Name: Charles Dellinger
B. Structural Engineering Consultant:
1. C ompany Name: RRM Design Group
a. Address Line 1: 3765 South Higuera Street, Suite 102 b. City: San Luis Obispo
c. State: CA.
d. Zip Code: 93401
e. Telephone: (805) 543-1794
2. Primary Contact:
a. Title: Structural Engineer
b. Name: Michael Doremus
C. Electrical Engineering Consultant:
1. Company Name: Thoma Electric, Inc.
a. Address Line 1: 3562 Empleo Street, Ste. C
b. City: San Luis Obispo
c. State: CA.
d. Zip Code: 93401
26 100% CD - IFB 00 01 03-3
DIVISION 00
SECTION 00 01 03
PROJECT DIRECTORY
c. Telephone: (805) 543-3850
2. Primary Contact:
a. Title: Electrical Engineer
b. Name: Chris Jose
D. Mechanical Engineer / Energy Compliance
1. Company Name: 3C Engineering
a. Address Line 1: 1500 Palm Street
b. City: San Luis Obispo
c. State: CA.
d. Zip Code: 93401
e. Telephone: (805) 540-3363
2. Primary Contact:
a. Title: Mechanical Engineer
b. Name: Denver Stranger
1.04 CONSTRUCTION MANAGER:
A. Company Name: To Be Determined.
1. Address Line 1:
2. City:
3. State:
4. Zip Code:
5. Telephone:
B. Primary Contact:
1. Title:
2. Name:
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
27 DIVISION 00
100% CD - IFB 00 01 07-1
SECTION 00 01 07
SEALS PAGE
Architect:
RRM Design Group
See Technical Spec Seals Page (00 01 07)
Structural Engineering Consultant:
RRM Design Group
See Technical Spec Seals Page (00 01 07)
Electrical Engineering Consultant:
Thoma Electric, Inc.
See Technical Spec Seals Page (00 01 07)
Mechanical Engineering Consultant:
3C Engineering
See Technical Spec Seals Page (00 01 07)
28 SECTION 00 01 10
TABLE OF CONTENTS DIVISION 00
100% CD - IFB 00 01 10-1
SECTION 00 01 10
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - Project Title Page
00 01 03 - Project Directory
00 01 07 - Seals Page (See Technical Spec Section 00 01 07) 00 01 10 - Table of Contents
00 11 13 - Notice Inviting Bids
00 21 13 - Instructions to Bidders
00 31 00 - Available Project Information
00 41 00 - Bid Form
00 43 13 - Bid Bond
00 43 25 - Substitution Request Form - During Procurement 00 43 27 - Summary of Cost and Bid Breakdown
00 43 36 - Proposed Subcontractors Form
00 45 13 - Bidder's Qualifications
00 45 46 - Governmental Certifications
1. Iran Contracting Act Certification
2. Ukraine Form of Compliance
3. Public Works Contractor Registration Certification
4. Contractor's Certificate Regarding Workers' Compensation
5. Fleet Compliance Certification
6. Certificate of Asbestos and Lead-Based Paint (New Work)
7. Non-Collusion Declaration
00 52 13 - Agreement Form - Public Works Contract
00 61 13 - Bond Forms
00 72 00 - General Conditions
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 10 00 - General Requirements
01 11 00 - Summary Of Work
01 21 00 - Allowances
01 23 00 - Alternates
01 25 13 - Product Procedures For Substitution And “Or Equal” 01 29 00 - Payment Procedures
01 29 73 - Schedule Of Values
01 31 00 - Project Management And Coordination
01 32 00 - Construction Progress Documentation
01 32 33 - Photographic Documentation
01 33 00 - Submittal Procedures
01 42 00 - Reference Standards
01 42 13 - Abbreviations, Symbols, And Acronyms
01 45 23 - Testing And Inspection
29 SECTION 00 01 10
TABLE OF CONTENTS DIVISION 00
100% CD - IFB 00 01 10-2
01 50 00 - Temporary Facilities and Controls
01 55 26 - Traffic Control And Access
01 57 23 - Temporary Storm Water Pollution Control
01 60 00 - Products, Materials, Equipment, and Substitutions 01 64 00 - Owner Furnished Products
01 71 23 - Field Engineering
01 73 29 - Cutting And Patching
01 74 19 - Construction and Demolition Waste Management 01 77 00 - Contract Closeout
01 78 36 - Warranties
01 81 13 - Sustainable Design Requirements
TECHNICAL SPECIFICATIONS (All Technical Specifications are provided as a separate document on the Planet Bids portal)
DIVISION 02 -- EXISTING CONDITIONS
02 41 19 - Selective Structure Demolition
DIVISION 03 -- CONCRETE (NOT USED)
DIVISION 04 -- MASONRY (NOT USED)
DIVISION 05 -- METALS (NOT USED)
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 00 - Rough Carpentry
06 18 00 – Glued-Laminated Construction
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 54 00 – Thermoplastic Membrane Roofing
07 62 00 - Sheet Metal Flashing and Trim
07 92 00 - Joint Sealants
DIVISION 08 – OPENINGS (NOT USED)
DIVISION 09 – FINISHES (NOT USED)
DIVISION 10 -- SPECIALTIES (NOT USED)
DIVISION 11 -- EQUIPMENT (NOT USED)
DIVISION 12 -- FURNISHINGS (NOT USED)
DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)
DIVISION 21 -- FIRE SUPPRESSION (NOT USED)
DIVISION 22 -- PLUMBING (NOT USED)
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) 23 00 00 – Heating, Ventilation, and Air Conditioning
23 00 13 – General Mechanical Requirements
DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 -- ELECTRICAL
26 05 00 – Common Work Results for Electrical
26 05 19 – Low Voltage Electrical Power Conductors and Cables 26 05 33 – Raceways and Boxes for Electrical System
26 05 53 – Identification of Electrical Systems
DIVISION 27 -- COMMUNICATIONS (NOT USED)
DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED) DIVISION 31 -- EARTHWORK (NOT USED)
DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)
30 SECTION 00 01 10
TABLE OF CONTENTS DIVISION 00
100% CD - IFB 00 01 10-3
DIVISION 33 -- UTILITIES (NOT USED)
DIVISION 34 -- TRANSPORTATION (NOT USED)
DIVISION 40 -- PROCESS INTEGRATION (NOT USED)
DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT (NOT USED)
EXHIBITS (Documents Provided in Planet Bids Portal)
A. 2025 – RRM Design Group, Plans for HVAC Replacement
B. 2025 – RRM Design Group, Structural Calculations Report C. 2026 – Photographs – RTU 11 & 17
D. 2014 – Roof Replacement Building Permit File
E. 2014 – Roof Replacement – Action Roofing Invoice and Proposal F. 2014 – IB Roofing Warranty Card
31 SECTION 00 11 13
NOTICE INVITING BIDS DIVISION 00
100% CD - IFB 00 11 13-1
NOTICE TO CONTRACTORS
INVITING SEALED BIDS
GOLETA CITY HALL, HVAC REPLACEMENT (PROJECT NO. 9137b)
PUBLIC NOTICE IS HEREBY GIVEN that the City of Goleta (“City”) invites sealed bids for the above stated project and will receive such bids via electronic transmission on the City of Goleta PlanetBids portal site until 2:00 P.M. (PST) on JULY 0 7, 2026, and will be publicly opened and posted on the PlanetBids portal site promptly thereafter.
PROPOSERS MUST BE REGISTERED ON THE CITY OF GOLETA’S PLANETBIDS PORTAL IN ORDER TO RECEIVE ADDENDUM NOTIFICATIONS AND SUBMIT A PROPOSAL.
Proposers are required to acknowledge receipt of all addenda issued. Proposers are responsible for obtaining all addenda from the City’s PlanetBids portal.
Copies of the Bid and Contract Documents may be obtained from the Planet Bids Website.
The work includes all labor, material, supervision, and equipment necessary to construct, deliver and install a finished GOLETA CITY HALL, HVAC REPLACEMENT PROJECT (NO. 9137b). Work includes the replacement of two existing rooftop HVAC units and associated curbs, limited ductwork replacement, and limited roofing and flashing, as further described in the Project Description.
Project Duration
The successful contractor (after receipt of Notice to Proceed) shall have 100 calendar days to complete all work called for under the Contract Documents.
Project Location
130 Cremona Drive, Goleta, California, 93117.
Project Description
The City seeks to remove two existing gas-fired rooftop HVAC units and replace with two new electric heat pumps and economizers ; curb replacement ; limited ductwork replacement; roof repairs and flashing installation; installation of a new support glulam beneath RTU 17; and required electrical upgrades and controls installation. The new HVAC units will be placed in roughly the same openings after curb replacement. System start-up, testing, and balancing are required.
Questions and Communications
All questions must be submitted electronically through PlanetBids. The deadline for receipt of questions is 5:00 P.M. (PST) on Thursday, June 18, 2026.
Mandatory Pre-Bid Meeting
Mandatory pre-bid meetings will be held at the Project Site (130 Cremona Drive, Goleta, California, 93117) at:
• Tuesday, June 2, 2026, at 2:00 P.M. (PST)
• Tuesday, June 9, 2026, at 2:00 P.M. (PST)
32 SECTION 00 11 13
NOTICE INVITING BIDS DIVISION 00
100% CD - IFB 00 11 13-2
Attendance at one meeting is required. Bidders must attend a pre- bid meeting, fully inspect the Project Site, and will be held responsible for all information presented. It is required that the Bidders become thoroughly familiar with the terms and conditions of the Bid Plans, Special Provisions, and Local Conditions affecting the performance and costs of the Work prior to bidding and it is recommended that this be done prior to attending the pre-bid meeting.
Bid Submittal Instructions
Bidders must be registered on the City of Goleta’s PlanetBids portal in order to access all bid documents, and to receive addendum notifications and to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to sub mit the bid with sufficient time to be received by PlanetBids prior to the bid submittal deadline.
Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted. All communications related to this project shall be conducted through PlanetBids. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the City does not consider these questions as bid protests. All bids must be submitted electronically through PlanetBids on or before 2:00 P.M. (PST) on Tuesday, July 0 7, 2026. At that time, the electronic bids will be opened within the system and made publicly available in PlanetBids immediately following opening.
Bid Security
The bid must be accompanied by a bid security in the form of a money order, a certified cashier’s check, or bidder’s bond executed by an admitted surety, made payable to City.
The bid security shall be an amount equal to ten percent (10%) of the total annual bid amount included with their proposals as required by California law.
Note: All bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) lowest bidders must also be mailed or submitted to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope and be received or postmarked within three (3) City business days after the bid due date and time; otherwise, the bid shall be considered non-responsive. The sealed envelope should be plainly marked on the outside, “SEALED BID SECURITY FOR GOLETA CITY HALL HVAC REPLACEMENT PROJECT NO. 9137b”.
Performance Security
Pursuant to Public Contract Code section 22300, the successful bidder may substitute certain securities for funds withheld by CITY to ensure performance under the Contract or, in the alternative, request the City to make payment of retention to an escrow agent.
Affirmative Action
The Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR) per California Labor Code Section 1771.4, including prevailing wage rates and apprenticeship employment standards. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City hereby affirmatively ensures that 33 SECTION 00 11 13
NOTICE INVITING BIDS DIVISION 00
100% CD - IFB 00 11 13-3
all business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract.
Department of Industrial Relations (DIR)
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the DIR. No Bid will be accepted, nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project. Failure to provide proof of the contractor’s current registration pursuant to Labor Code Section 1725.5 may result in rejection of the bid as non-responsive.
Contractor License
A contract may only be awarded to the lowest responsive and responsible bidder properly licensed in accordance with the laws of the State and the City of Goleta. Contractor shall possess a valid Class B - General Building Contractor license prior to award of Contract.
Said license shall be maintained during the contract period. It is the Bidder’s and Contractor’s responsibility to obtain the correct Contractor’s licenses. Bidders shall be skilled and regularly engage in the general class or type of work called for under this contract.
Performance and Payment Bonds
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.
This is project is a public work in the State of California, funded in whole or in part with public funds. Therefore, the higher of the two applicable prevailing wage rates, federal or state, will be enforced. The Contractor’s duty to pay State prevailing wages can be found under Labor Code Section 1770 et seq. Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and to employ apprentices, including forfeitures and debarment. The State Wage Decision is on file at the City Clerk’s office and is also available online at http://www.dir.ca.gov/dlsr/.
Apprenticeship Program
Attention is directed to Sections 1777.5, 1777.6 and 1777.7 of the California Labor Code and Title 8, California Administrative code, Section 200 et seq. to ensure compliance and complete understanding of the law regarding apprentices.
Conflict of Interest
In the procurement of supplies, equipment, construction, and services, the conflict of interest provisions in 2 CFR 200.318 shall apply. No employee, officer, or agent may participate in the selection, award, or administration of a contract supported by a Federal award if he or she has a real or apparent conflict of interest. 34 SECTION 00 11 13
NOTICE INVITING BIDS DIVISION 00
100% CD - IFB 00 11 13-4
Such a conflict of interest would arise when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or an organization which employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from a firm considered for a contract. The officers, employees, and agents of the non -Federal entity may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors or parties to subcontracts.
Contractor Experience
The Contractor Company, including the Responsible Managing Officer (RMO) for the Contractor Company, shall demonstrate a minimum of ten (10) years' experience successfully performing projects of substantially similar type, magnitude, and character of the work bid.
Rejection of Bids
The City reserves the right to reject all bids, reject any bid that is not responsive to the invitation, or to waive any minor irregularity and to take all bids under advisement for a period of up to one hundred and twenty (120) calendar days. Failure to provide proof of the Contractor’s current registration pursuant to Section 1725.5 of the Labor Code may result in rejection of the bid as non- responsive. Failure to comply with enforcement provisions pursuant to Section 1771.4 of the Labor Code may result in a determination that the Bidder is not responsible.
Liquidated Damages
The Liquidated Damages shall be $1,800 per day.
Protest
Any protest to an intended award of this contract shall be made in writing addressed to the City Clerk according to Specification Section 002113, Paragraph 5.25 (Filing of Bid Protests) and filed and received by the City not more than five (5) calendar days following the date of City’s Notice of Intent to Award the Contract. Any protest may be considered and acted on by the City Council at the time noticed for award of the contract. To request a copy of the notice of agenda for award, please contact the City Clerk (805) 961-7505 or register on the City’s website (www.cityofgoleta.org).
All questions about this project and bidding requirements must be submitted in writing through PlanetBids.
Publication Date: Santa Barbara Independent, May 21, 2026
END OF NOTICE INVITING BIDS
35 100% CD - IFB 00 21 13-1
SUMMARY
1.01 DOCUMENT INCLUDES
A. Invitation
1. Questions
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
DIVISION 00
2. Mandatory Pre-Bid Meeting
B. Bid Documents and Contract Documents
1. Securing Documents
2. Examination of Site and Contract Documents
3. Interpretation of Drawings and Documents
4. Product Substitutions
5. Addenda
6. Alternate Bids
C. Qualifications
1. Subcontractors
2. Licensing Requirements
D. Bid Submission/Enclosures/Requirements
1. Completion of Bid Forms
2. Bid Delivery and Modifications of Bids
3. Bid Guarantee (Bond)
4. Iran Contracting Act of 2010
5. Compliance with Economic Sanctions in Response to Russia's Actions in Ukraine
6. Noncollusion Declaration
7. Public Works Contractor Registration Certification
8. Fleet Compliance Certification
9. Certificate of Asbestos and Lead-Based Paint (New Work)
10. Bidder Information and Experience Form
11. Workers' Compensation Certification
12. Signing of Bids
13. Submission of Sealed Bids
14. Opening of Bids
15. Withdrawal of Bid
16. Submission of Cost Breakdown by Apparent Low Bidders
17. B
idders Interested in More Than One Bid
18. Substitution of Security
19. Debarment of Contractors and Subcontractors
20. Insurance Requirements
21. Performance Bond and Payment Bond Requirements
22. Sales and Other Applicable Taxes, Permits, Licenses, and Fees
23. Permit Fee Allowance
24. Filing of Bid Protests
25. Basis of Award, Balanced Bid
26. Award Process
27. Execution of Contract
36 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-2
1.02 RELATED DOCUMENTS
A. Document 00 11 13 - Notice Inviting Bids
B. Document 00 41 00 - Bid Form
C. Document 00 43 13 - Bid Bond
D. Document 00 43 36 - Proposed Subcontractors Form
E. Document 00 43 25 - Substitution Request Form - During Procurement F. Document 00 43 27 - Summary of Cost and Bid Breakdown.
G. Document 00 73 00 - Special Conditions
H. Document 00 45 13 - Bidder's Qualifications
I. Document 00 45 46 - Governmental Certifications
INVITATION
2.01 QUESTIONS
A. Questions regarding this Notice Inviting Bids must be submitted via electronic transmission on the City of Goleta PlanetBids portal site by 5:00 P.M. (PST) on Thursday, June 18, 2026. No other members of the City's staff or governing body should be contacted about this procurement during the bidding process. Any and all inquiries and comments regarding this Bid must be communicated in writing, unless otherwise instructed by the City. The City may, in its sole discretion, disqualify any Bidder who engages in any prohibited communications.
2.02 MANDATORY PRE-BID MEETING
A. Mandatory pre-bid meetings will be held at the Project Site (130 Cremona Drive, Goleta, California, 93117) at:
• T ues day, June 2, 2026, at 2:00 P.M. (PST)
• Tuesday, June 9, 2026, at 2:00 P.M. (PST)
B. Attendance at One meeting is required. Bidders must attend a pre-bid meeting, fully inspect the Project Site, and will be held responsible for all information presented. It is required that the Bidders become thoroughly familiar with the terms and conditions of the Bid Plans, Special Provisions, and Local Conditions affecting the performance and costs of the Work prior to bidding and it is recommended that this be done prior to attending the pre-bid meeting.
C. Meetings will begin promptly at 2:00pm in the south parking lot, adjacent to the EV Charging Stations parking spaces. On-site General Services staff will lead the attendees through the pre-bid walk-through.
BID DOCUMENTS AND CONTRACT DOCUMENTS
3.01 SECURING DOCUMENTS
A. Bids must be submitted to the City on the Bid Forms, which are a part of the Bid Package for the Project. The proposal forms, bid security, and all other documents required to be submitted with the bid must be submitted via electronic transmission on the City of Goleta PlanetBids portal site.
Bid and Contract Documents may be obtained from PlanetBids in the Notice Inviting Bids.
B. Bidders must be registered on the City of Goleta's PlanetBids portal in order to access bid documents, receive addendum notifications, and to submit a bid. Visit PlanetBids for bid results and award information. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.
C. F ailure to acknowledge addenda on the Bid Form may make a bid nonresponsive and not eligible for award of the contract.
37 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-3
3.02 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A. At it s own expense and prior to submitting its Bid, each Bidder shall visit the site of the proposed work and fully acquaint itself with the conditions relating to the construction and labor required so that the Bidder may fully understand the work, including but not limited to difficulties and restrictions attending the execution of the work under the contract. Site examination shall occur during the scheduled pre-bid meetings. Each Bidder shall carefully examine the Drawings, and shall read the Specifications, Contract, and all other documents referenced herein. Each Bidder shall also determine the local conditions which may in any way affect the performance of the work, including local tax structure, contractors' licensing requirements, availability of required insurance, the prevailing wages and other relevant cost factors, shall familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the work, including the cost of permits and licenses required for the work, and shall make such surveys and investigations, including investigations of subsurface or latent physical conditions at the site or where work is to be performed as may be required. Bidders are responsible for consulting the standards referenced in the Contract. The f ailure or omission of any Bidder to receive or examine any contract documents, forms, instruments, addenda, or other documents, or to visit the site and acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation with respect to its Bid or to the contract and no relief for error or omission will be given except as required under State law. The submission of a Bid shall be taken as conclusive evidence of compliance with this Article.
3.03 I NTERPRETATION OF DRAWINGS AND DOCUMENTS
A. Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or other proposed contract documents may submit to the City a written request for interpretation through PlanetBids. The prospective Bidder submitting the request is responsible for prompt delivery. Interpretation of the Drawings, Specifications, or other proposed contract documents will be made only by a written addendum duly issued through PlanetBids. The City will not be responsible for any other explanation or interpretations of the proposed documents. If a Prospective Bidder becomes aware of any errors or omissions in any part of the Contract Documents, it is the obligation of the Prospective Bidder to promptly bring it to the attention of the City through PlanetBids.
B. Before submitting its bid, bidder will carefully study and compare the various documents comprising the Contract Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the bid is submitted; will examine the project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City's representative errors, inconsistencies, or ambiguities discovered. The drawings and specifications contained in these Contract Documents do not constitute a representation or warranty that any conditions shown therein actually exist.
C. C larifications, interpretations, corrections, and changes to the Contract Documents will only be made by addenda. Purported clarifications, interpretations, corrections, and changes to the Contract Documents made in any other manner will not be binding and bidders will not rely upon them.
38 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-4
3.04 PRODUCT SUBSTITUTIONS
A. R equests for product substitutions will be considered during the bidding process. All requests shall be submitted through a Bid RFI process (electronically through PlanetBids Question and Answer tab), so that all bidders will be informed. All requests must be submitted by the Question Deadline timeframe specified in 00 21 13 Section 2.01(A). Bidders wishing to obtain authorization for an or equal substitution of an equivalent material, product or equipment, shall submit all requests for or equal substitution using the form included as 00 43 25 - Substitution Request Form - During Procurement, together with data substantiating Bidder's representation that the non-specified item is of equal quality to the item, in accordance with 01 25 13 - Product Procedures For Substitution And “Or Equal” . Requests for product substitutions not handled through the Bid RFI process will not be considered. Authorization of an equal substitution of equivalent materials is solely within the discretion of the City and, if given, shall be made by Addendum issued by the City before Bid Opening. Bids shall not be based on any or equal substitution request that has not been authorized in writing by Addendum. In the absence of a written Addendum authorizing a pr e- Bid or equal substitution request, the request shall be deemed denied.
3.05 ADD ENDA
A. The City reserves the right to revise the Contract Documents prior to the Bid opening date.
Revisions, if any, shall be made by written Addenda. All Addenda issued by the City shall be included in the Bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum which includes material changes to the Project less than 72 hours prior to the deadline for submission of Bids, the City will extend the deadline for submission of Bids. The City may determine, in its sole discretion, whether an Addendum warrants postponement of the Bid submission date. Bidders must be registered on the City's PlanetBids portal to receive addendum notifications. Addenda will be posted on PlanetBids portal.
The Bidder shall indicate the Addenda received prior to bidding in the space provided in the Bid Form. Failure to indicate all Addenda received may be sufficient cause for rejecting the Bid.
3.06 ALTERNATE BIDS
A. If alternate bid items are called for in the Contract Documents, the time required for completion of the alternate bid items has already been factored into the Contract duration and no additional Contract time will be awarded for any of the alternate bid items. The City may elect to include one or more of the alternate bid items, or to otherwise remove certain work from the Project scope of work. Accordingly, each bidder must ensure that each bid item contains a proportionate share of profit, overhead, and other costs or expenses which will be incurred by the bidder.
Q
UALIFICATIONS
4.01 SUBCONTRACTORS
A. Bidder shall set forth the name, address of the place of business, and contractor license number of each subcontractor who will perform work, labor, furnish materials or render services to the bidder on said contract and each subcontractor licensed by the State of California who, under subcontract to bidder, specially fabricates and installs a portion of the Work described in the Drawings and Specifications in an amount in excess of one half of one percent (0.5%) of the total bid price, and shall indicate the portion of the work to be done by such subcontractor in accordance with Public Contract Code Section 4104. Substitution of subcontractors after the bid deadline, who are listed in the proposal form will only be allowed with the City's written consent and in accordance with California law.
39 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-5
4.02 LICENSING REQUIREMENTS
A. Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, all bidders must possess proper licenses for performance of this Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Business and Professions Code Section 7028.5, the City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have the right to request, and Bidders shall provide within ten (10) calendar days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder's subcontractors, before awarding the Contract.
B. Prime contractor shall hold an active Class B – General Building Contractor license at bid and award. Subcontractors shall hold appropriate specialty licenses for their trades.
BID SUBMISSION/ENCLOSURES/REQUIREMENTS
5.01 COMPLETION OF BID FORMS
A. Bids will be submitted on the proposal forms included with the Contract Documents. Bids not submitted on the City's proposal forms will be rejected. All blanks on the proposal forms will be filled in legibly. Bidder's failure to submit a price for any alternate or unit price will result in the bid being considered as non-responsive. If alternates are called for and no change in the lump sum base bid is required, enter “no change.”
B. B idder will make no stipulations on the proposal forms nor qualify the bid in any manner. The bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the bidder (if awarded the contract) specifically agrees to construct a completed Work ready for the use and in the manner which is intended.
C. Bidder is aware of and, if awarded the contract, will comply with legal requirements in its performance of the Work and is required to pay City business license fee(s).
D. Bidder shall not damage or endanger and shall preserve and protect adjacent properties.
E. Bidder has familiarized itself with the staging and material storage constraints of the Project site and surrounding buildings and will confine its staging and storage operations to approved areas.
F. Bidder will coordinate its construction activities with the other contractors and utility companies performing work on the Project site, if any, including, but not limited to, any separate contractor retained by the City. Contractors shall assemble and submit, as part o f their bids, a preliminary construction schedule in Microsoft Projects or Excel integrating all activities required to successfully complete the project.
G. R efer to the Bid Form for specifics. Bid Forms must include all required supplements and attachments, as specified.
5.02 BID DELIVERY AND MODIFICATIONS OF BIDS
A. The proposal forms, bid security, and all other documents required to be submitted with the bid must be submitted via electronic transmission on the City of Goleta PlanetBids portal site. Bidders must be registered on the City of Goleta's PlanetBids portal in order to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.
40 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-6
B. Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions thereon. Oral, telephonic and electronic modifications will not be considered.
C. Bids may not be modified, withdrawn, or canceled within one hundred twenty (120) calendar days after the bid deadline unless otherwise provided in any supplementary instructions to bidders. If a Bidder withdraws, cancels or modifies its bid within the time specified above, the bidder shall be prohibited from further bidding on the project and the bid bond shall be forfeited. The City, at its discretion, may award the bid to the next responsive and responsible bidder. In the event the next bidder refuses to enter into the contract, that bidder's bid bond shall then be forfeited.
5.03 BID GUARANTEE (BOND)
A. Each bid must be accompanied by bid security, in the amount of 10% of the Total Base Bid on the base Contract Work, excluding any Alternate Bid Items, as security for bidder's obligation to enter into a contract with the City on the terms stated in the proposal forms and to furnish all items required by the Contract Documents.
B. Al l bids must be accompanied by a scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) apparent lowest bidders must be mailed to the office of the City Clerk at 130 Cremona Drive, Suite B, Goleta, California 93117, in a sealed envelope and be received within three (3) city business days after bid due date and time; otherwise, the bid will be considered non-responsive. The sealed envelope should be plainly marked on the outside identifying the names as shown in the notice inviting sealed bids.
C. If the apparent lowest responsible bidder fails to sign the contract and furnish all items required by the bidding documents within the time limits specified in these bidding instructions, the City may reject such bidder and select the next apparent lowest responsible bidder until all bids have been exhausted or the City may reject all bids. In the event the bid is rejected, such bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the bid security, between the amount of the disqualified bid and the larger amount for which the City procures the Work. The City may also use the bid security to cover the cost of rebidding the project.
D. If a bid bond is submitted and an attorney-in-fact executes the bid bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the bid bond. The surety issuing the bid bond must be admitted to provide surety within the State of California.
E. The City will retain the bid security until the occurrence of one of the following:
1. All items required by the bidding documents have been furnished and the contract has been signed by the successful bidder and the City.
2. The specified time has elapsed during which bids may be withdrawn.
3. All bids have been rejected.
41 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-7
5.04 IRAN CONTRACTING ACT OF 2010
A. In accordance with Public Contract Code Section 2200 et seq., the City requires that any person that submits a bid or proposal or otherwise proposes to enter into or renew a contract with the City with respect to goods or services of one million dollars ($1,000,000) or more, certify at the time the bid is submitted or the contract is renewed, that the person is not identified on a list created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision (b) of Public Contract Code Section 2202.5, as applicable.
B. The form of such Iran Contracting Certificate is included with the bid package and must be signed and dated under penalty of perjury.
5.05 COMPLIANCE WITH ECONOMIC SANCTIONS IN RESPONSE TO RUSSIA'S ACTIONS IN
UKRAINE
A. Per Executive Order N-6-22, all contractors and grantees that have agreements valued at $5 million or more with agencies/departments subject to the California Governor's authority are directed to report to their contracting or grantor agency or department regarding their compliance with economic sanctions imposed by the U.S. government in response to Russia's actions in Ukraine, as well as sanctions imposed under state law, if any.
B. T he form of compliance is included with the bid package and must be signed and dated under penalty of perjury.
5.06 NONCOLLUSION DECLARATION
A. Bidders on all public works contracts are required to submit a declaration of non-collusion with their bid. This form is included with the bid package and must be signed and dated under penalty of perjury.
5.07 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION A. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. To this end, Bidder shall sign and submit with its Bid the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained therein. Failure to submit this form may render the bid non-responsive. In addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Designation of Subcontractors form.
5.08 F LEET COMPLIANCE CERTIFICATION
A. Bidders must certify compliance with the California Air Resources Board (CARB) Regulation set forth in Title 13, California Code of Regulations, Division 3, Chapter 9, effective January 1, 2024.
Under penalty of perjury, each bidder shall declare whether their fleet, and that of any subcontractors, is subject to the Regulation and provide a Certificate of Reported Compliance, qualifies for an exemption under section 2449.1(f)(2) with supporting documentation, is unable to procure R99 or R100 renewable diesel fuel under section 2449.1(f)(3) with records of attempts to procure, qualifies for an emergency exemption under section 2449(i)(4) with vehicle records maintained, or is otherwise not subject to the Regulation with a detailed explanation. 42 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-8
5.09 CERTIFICATE OF ASBESTOS AND LEAD-BASED PAINT (NEW WORK) A. Bidders must certify that no asbestos-containing material in excess of 1 percent as defined by applicable US Environmental Protection Agency regulations, and no lead-based paint has been furnished or installed at the referenced project.
B. 5.11 BIDDER INFORMATION AND EXPERIENCE FORM
Each Bidder shall complete the questionnaire provided herein and shall submit the questionnaire along with its Bid. Failure to provide all information requested within the questionnaire along with the Bid may cause the bid to be rejected as non-responsive. The City reserves the right to reject any Bid if an investigation of the information submitted does not satisfy the City that the Bidder is qualified to properly carry out the terms of the contract.
5.12 WORKERS' COMPENSATION CERTIFICATION
A. In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the payment of compensation to its employees. Contractor shall sign and file with the City the following certificate prior to performing the work under this Contract:
I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
B. T he form of such Workers' Compensation Certificate is included as part of this document.
5.13 SIGNING OF BIDS
A. All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of their Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.
B. If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom.
The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.
5.14 SU BMISSION OF SEALED BIDS
A. Once the Bid and supporting documents have been completed and signed as set forth herein, they shall be submitted, along with the Bid Guarantee and other required materials via electronic transmission on the City of Goleta PlanetBids portal site, which can be accessed at the City website, and will be publicly opened and posted promptly thereafter. Bids received after the time and day set for the receipt of bids shall not be accepted.
5.15 OPENING OF BIDS
At the time and place set for the opening and reading of bids, or any time thereafter, each and every bid received prior to the time and day set for the receipt of bids will be At that time, the electronic bids will be opened within the PlanetBids system and made publicly available in PlanetBids immediately following opening. The City will not accept any Bid received after the specified date and time. It is the bidder's sole responsibility to ensure that its Bid is received as specified. Bids may be submitted earlier than the date(s) and time(s) indicated.
43 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-9
A. The public bid result will include the following information:
1. The name and business location of the bidder.
2. The nature and amount of the bid security furnished by bidder.
3. The bid amount.
B. A responsive Bid is a Bid that conforms, in all material respects, to these Instructions to Bidders.
Non-responsive Bids will be rejected.
C. A responsible bidder means a bidder who has demonstrated the attributes of trustworthiness, quality, fitness, capacity, and experience to satisfactorily perform fully the requirements of the Contract.
D. In addition to other provisions of the Bidding Documents, upon the request of the City, a bidder whose Bid is under consideration for the award of the Contract shall promptly submit satisfactory evidence to City showing the bidder's financial resources, experience in the field, and organization and other factors evidencing bidder's ability to successfully execute and complete the Contract.
E. T he City reserves the right to reject any or all bids and to waive discrepancies, irregularities, informalities, or any other error in the bid or bidding, when to do so seems to best serve the public interest. The right of the City to waive errors applies even if the Bidding Documents state that a discrepancy, irregularity, informality, or other error make a bid nonresponsive, so long as the error does not constitute a material error. The City reserves the right, in its sole discretion, to: judge the bidder's representations as stated in the proposal forms and any post-Bid information to determine whether or not bidder is qualified to perform the Work; be the sole judge regarding the suitability of the products, services, or supplies offered; to not purchase all items or the full quantity of each item listed in the Bid Item List; reject any or all Bids; waive any deficiencies, irregularities, or informalities in any Bids or in the bidding process; modify, cancel, or withdraw the Notice Inviting Sealed Bids; issue a new Notice Inviting Sealed Bids; suspend or abandon the Project; seek the assistance of outside technical experts in Bid evaluation; require a bidder to provide a g uarantee (or guarantees) of the Contract by a third party; and not issue a Notice to Proceed after execution of the Contract.
In submitting a Bid in response to the Notice Inviting Sealed Bids, the bidder is specifically acknowledging the City holds these rights. The Notice Inviting Sealed Bids does not commit the City to enter into a Contract, to reject, in its sole discretion, all Bids, nor does it obligate the City pay for any costs incurred by bidders in preparation and submission of a Bid or in anticipation of a Contract. By submitting a Bid, the bidder disclaims any right to be paid for such costs.
F. T he City may reject any bid not accompanied by the required bid security or any other item required by the bidding documents, or a bid which is in any other way materially incomplete, irregular or not responsive to the bid request in the sole determination of the City
5.16 SUBMISSION OF COST BREAKDOWN BY APPARENT LOW BIDDERS A. Within three (3) business days after bid opening, the three (3) apparent lowest bidders shall submit to the City the completed Cost Breakdown Form (Section 00 43 27).
B. The form shall be itemized by CSI Division (or as otherwise directed in the Bid Documents) and shall reconcile to the total lump sum bid.
C. Failure to submit the required Cost Breakdown Form within the time specified may render the bid nonresponsive and eliminate the bidder from further consideration.
5.17 WITHDRAWAL OF BID
A. Any bid may be withdrawn either personally or by written request, incurring no penalty, at any time prior to the scheduled closing time for receipt of bids. Requests to withdraw bids shall be worded so as not to reveal the amount of the original bid. Withdrawn bids may be resubmitted until the time and day set for the receipt of bids, provided that resubmitted bids are in conformance with the instructions herein.
B. B ids may not be modified, withdrawn, or canceled within one hundred twenty (120) days after the 44 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-10
bid deadline unless otherwise provided in any supplementary instructions to bidders. If a bidder withdraws, cancels or modifies its bid within the time specified above, the bidder shall be prohibited from further bidding on the project and the bid bond shall be forfeited. The City, at its discretion, may award the bid to the next responsive and responsible bidder. In the event the next bidder refuses to enter into the contract, that bidder's bid bond shall then be forfeited.
C. Bids may be withdrawn after bid opening only by providing written notice to City within five (5) working days of the bid opening and in compliance with Public Contract Code Section 5100 et seq., or as otherwise may be allowed with the consent of the City.
5.18 BIDDERS INTERESTED IN MORE THAN ONE BID
A. No Bidder shall be allowed to make, file or be interested in more than one bid for the same work unless alternate bids are specifically called for. A person, firm or corporation that has submitted a sub-proposal to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other bidders. No person, firm, corporation, or other entity may submit a sub-proposal to a Bidder, or quote prices of materials to a Bidder, when also submitting a prime Bid on the same Project.
5.19 S UBSTITUTION OF SECURITY
A. The Contract Documents call for monthly progress payments based upon the percentage of the Work completed. The City will retain a percentage of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.
5.20 PREVAILING WAGES
A. The City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract. These rates are available at the Engineering Division of the City or may be obtained online at http://www.dir.ca.gov . Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).
5.21 DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
A. In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Sections 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law.
A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
45 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-11
5.22 INSURANCE REQUIREMENTS
A. Prior to commencing work, the successful bidder shall purchase and maintain insurance as set forth in the General Conditions.
5.23 PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
A. The successful bidder will be required to furnish a Labor and Material Payment Bond and a Faithful Performance Bond each in an amount equal to one hundred percent (100%) of the contract price.
Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and is admitted by the State of California. Each bond shall be accompanied, upon the request of City, with all documents required by California Code of Civil Procedure Section 995.660 to the extent required by law. All bonding and insurance requirements shall be completed and submitted to City within ten (10) working days from the date the City provides the successful bidder with the Notice of Intent to Award.
5.24 SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES A. Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents.
5.25 AL LOWANCES
A. Not Applicable.
5.26 FILING OF BID PROTESTS
A. Any registered Bidder may file a protest provided that each and all of the following are complied with:
1. The bid protest is in writing;
2. Protests based upon alleged defects or improprieties in the Bidding Documents are filed with the City prior to the Bid Deadline;
3. All other protests are filed and received by the City not more than five (5) calendar days following the date of City's Notice of Intent to Award the Contract; and
4. The written bid protest sets forth, in detail, all grounds for the bid protest, including without limitation all facts, supporting documentation, legal authorities and argument in support of the grounds for the bid protest. All factual contentions must be supported by competent, admissible and credible evidence.
B. Any matters not set forth in the written bid protest shall be deemed waived. Any bid protest not conforming to the foregoing shall be rejected by the City as invalid.
AWARD PROCESS
6.01 BASIS OF AWARD; BALANCED BID
A. The City shall award the Contract to the lowest responsible Bidder submitting a responsive Bid.
The lowest Bid will be determined on the basis of the Base Bid Price.
B. T he City may reject any Bid which, in its opinion when compared to other Bids received or to the City's internal estimates, does not accurately reflect the cost to perform the Work. The City may reject as non-responsive any Bid which unevenly weights or allocates costs, including but not limited to overhead and profit to one or more particular bid items. 46 SECTION 00 21 13
INSTRUCTIONS TO BIDDERS DIVISION 00
100% CD - IFB 00 21 13-12
6.02 AWARD PROCESS
A. The City may retain all bids for a period of one hundred twenty (120) days for examination and comparison, and to delete any portion of the Work from the contract.
B. The City may waive nonmaterial irregularities in a bid and will accept the lowest responsive bid from a responsible bidder as determined by the City.
C. The City will determine the low bidder on the basis of the total base bid price in words on the bidding sheet as described on the bidding sheet.
D. City Staff will identify the apparent lowest responsive and responsible bidder and notify such bidder within one hundred and twenty (120) calendar days (unless the number of days is modified in any Addendum issued to bidders) after the Bid Deadline. Within fifteen (15) days after receiving the City's written notice that bidder was identified as the apparent lowest responsible bidder, bidder will submit to the City all of the following items as required by the City:
1. One original of the payment bond.
2. One original of the performance bond.
3. Certificates of insurance and additional insured endorsements on forms provided by the city.
4. C opy of current City of Goleta business license certificate.
5. Names of all subcontractors, with their DIR registration number, license numbers, addresses, telephone number, facsimile number and trade on bidders' company stationery.
Evidence, as required by the city, of the reliability and responsibility of the proposed subcontractors such as statements of experience, statements of financial condition, and references.
E. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. This Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.
F. If bidder submits all items required within fifteen (15) days after receiving the City's notification, and all such items comply with the requirements of the bidding documents, the City will submit the bid to the City Council for award of Contract. Following City Council Award of Contract, the City will sign the contract and return a signed copy of the contract to bidder.
6.03 EX ECUTION OF CONTRACT
A. As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The City may require appropriate evidence that the persons executing the Contract are duly empowered to do so. The Contract and bond forms to be executed by the successful Bidder are included within these Specifications and shall not be detached.
END OF SECTION
47 DIVISION 00
100% CD - IFB 00 31 00-1
PART 1 GENERAL
1.01 EXISTING CONDITIONS
SECTION 00 31 00
AVAILABLE PROJECT INFORMATION
A. 2025 – RRM Design Group – Plan Set for HVAC Replacement B. 2025 – RRM Design Group – Structural Calculations Report C. 2026 - Photographs – RTUs 11 & 13
D. 2014 – Roof Replacement, Bldg. Permit File
E. 2014 – Roof Replacement, Action Roof Invoice and Proposal F. 2014 – Roof Replacement, IB Roofing Warranty Card
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
48 DIVISION 00
100% CD - IFB 00 41 00-1
SECTION 00 41 00
BID FORM
TO: CITY OF GOLETA (OWNER)
130 CREMONA DRIVE, SUITE B
GOLETA, CALIFORNIA 93117
FOR: GOLETA CITY HALL HVAC REPLACEMENT PROJECT (CIP 9137b) DATE:
(Bidder to enter date)
SUBMITTED BY:
(Bidder to enter name)
Bidder's Full Name
Address
City, State, Zip
Bids will be received via electronic transmission on the City of Goleta PlanetBids portal site until the time specified in the Invitation to Bid.
The undersigned hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and addenda, if any, for the Project.
We hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project, as described and in strict conformity with the Drawings, and these Specifications for the TOTAL BID PRICE indicated herein.
The undersigned acknowledges receipt, understanding, and full consideration of the following addenda to the Contract Documents:
1. Addendum # Dated .
2. Addendum # Dated .
3. Addendum # Dated .
4. Addendum # Dated .
49 DIVISION 00
100% CD - IFB 00 41 00-2
SECTION 00 41 00
BID FORM
The undersigned acknowledges inclusion of the following allowances in the Base Bid in accordance with Section 012100 - Allowances:
1. Allowance No. 1 – No Allowances Included in the Bid The Bidder understands that unused portions of allowances will be adjusted by Change Order in accordance with the Contract Documents.
The following Supplements are attached to this Bid Form and are considered an integral part of this Bid Form:
1. Document 004313 - Bid Bond
2. Document 004336 - Proposed Subcontractors Form
3. Document 004513 - Bidder's Qualifications
4. Document 004546 - Governmental Certifications
a. Iran Contracting Act Certification
b. Ukraine Form of Compliance
c. Public Works Contractor Registration Certification
d. Contractor's Certificate Regarding Workers' Compensation e. Fleet Compliance Certification
f. Certificate of Asbestos and Lead-Based Paint (New Work) g. Non-Collusion Declaration
50 DIVISION 00
100% CD - IFB 00 41 00-3
SECTION 00 41 00
BID FORM
TOTAL BASE BID PRICE:
TOTAL BASE BID PRICE FOR GOLETA CITY HALL HVAC
REPLACEMENT PROJECT (CIP 9137b)
$
Total Bid Price in Numbers
$
Total Bid Price in Written Form
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
51 DIVISION 00
100% CD - IFB 00 41 00-4
SECTION 00 41 00
BID FORM
The undersigned agrees that this Bid Form constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after the Bid opening, or until a Contract for the Work is fully executed by the City and a third party, whichever is earlier.
The successful bidder hereby agrees to sign the contract and furnish the necessary bonds and certificates of insurance within ten (10) working days after the City provides the successful bidder with the Notice of Award.
Upon receipt of the signed contract and other required documents, the contract will be executed by the City, after which the City will prepare a letter giving Contractor Notice to Proceed. The official starting date shall be the date of the Notice to Proceed, unless otherwise specified. The undersigned agrees to begin the Work within ten (10) working days of the date of the Notice to Proceed, unless otherwise specified.
The undersigned has examined the location of the proposed work and is familiar with the Drawings and Specifications and the local conditions at the place where work is to be done.
If aw arded the contract, the undersigned agrees that there shall be paid by the undersigned and by all subcontractors to all laborers, workers and mechanics employed in the execution of such contract no less than the prevailing wage rate within Santa Barbara County for each craft, classification, or type of worker needed to complete the Work contemplated by this contract as established by the Director of the Department of Industrial Relations. A copy of the prevailing rate of per diem wages are on file at the City's Engineering Division and shall be made available to interested parties upon request.
which is not less than ten percent (10%) of this bid, payable to City of Goleta as bid security and which is given as a guarantee that the undersigned will enter into a contract and provide the necessary bonds and certificates of insurance if awarded the Work.
The bidder furthermore agrees that in case of bidder's default in executing said contract and furnishing required bonds and certificates of insurance, the cash, bidder's bond, or cashier's or certified check accompanying this proposal and the money payable thereon shall become and shall remain the property of the City of Goleta.
Bidder is an individual , or corporation , or partnership , organized under the
CONTINUED ON NEXT PAGE
the Bank in the amount of ,
Enclosed find cash, bidder's bond, or cashier's or certified check No. from laws of the State of .
52 DIVISION 00
100% CD - IFB 00 41 00-5
SECTION 00 41 00
BID FORM
Bidder confirms license(s) required by California State Contractor's License Law for the performance of the subject project are in full effect and proper order. The following are the Bidder's applicable license number(s), with their expiration date(s) and class of license(s):
If the Bidder is a joint venture, each member of the joint venture must include the required licensing information.
Sureties that will furnish the Faithful Performance Bond and the Labor and Material Payment Bond, in the form specified herein (Section 006113), in an amount equal to one hundred percent (100%) of the contract price within ten (10) working days from the date the City provides the successful bidder the Notice of Award. Sureties must meet all of the State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and must be authorized by the State of California.
The insurance company or companies to provide the insurance required in the contract documents must have a Financial Strength Rating of not less than “A-” and a Financial Size Category of not less than “Class VII” according to the latest Best Key Rating Guide. At the sole discretion of the City, the City may waive the Financial Strength Rating and the Financial Size Category classifications for Workers' Compensation insurance.
CONTINUED ON NEXT PAGE
53 DIVISION 00
100% CD - IFB 00 41 00-6
SECTION 00 41 00
BID FORM
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.
(Corporate Seal) (Bidders Name)
(Name and Title)
(Signature)
Names of individual members of firm or names and titles of all officers of corporation and their addresses are listed below:
Name: Title:
Complete Address:
Phone: Fax:
Name: Title:
Complete Address:
Phone: Fax:
Name: Title:
Complete Address:
Phone: Fax:
Name: Title:
Complete Address:
Phone: Fax:
END OF SECTION
54 SECTION 00 43 13
BID BOND DIVISION 00
[Note: Not required when other form of Bidder's Security, e.g. cash, certified check or cashier's check, accompanies bid.]
, as Surety and are held and firmly bound unto the
City of Goleta, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to City for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated , 20 for the GOLETA CITY HALL HVAC REPLACEMENT PROJECT, NO. 9137b.
If the Principal does not withdraw its Bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.
Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall in affect its obligation under this bond, and Surety does hereby waive notice of any such changes.
In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys' fees, court costs, expert witness fees and expenses.
By their signatures hereunder, Surety and Principal hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California.
(Corporate Seal)
Contractor/ Principal
By
Title
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
100% CD - IFB 00 43 13-1
The makers of this bond are, , as
Principal, and
IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this day of , 20 , the name and corporate seal of each corporation. (Corporate Seal) Surety
55 SECTION 00 43 13
BID BOND DIVISION 00
100% CD - IFB 00 43 13-2
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On , 20 , before me, , Notary Public, personally
Date Name And Title Of Officer (e.g. “Jane Doe, Notary Public”) appeared , who proved to me on the basis of satisfactory Name(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Place Notary Seal Above Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT □ Individual
□ Corporate Officer
Title(s)
□ Partner(s) □ Limited
□ General
□ Attorney-In-Fact
□ Trustee(s)
□ Guardian/Conservator
□ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. 56 SECTION 00 43 13
BID BOND DIVISION 00
100% CD - IFB 00 43 13-3
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On , 20 , before me, , Notary Public, personally
Date Name And Title Of Officer (e.g. “Jane Doe, Notary Public”) appeared , who proved to me on the basis of satisfactory Name(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Place Notary Seal Above Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT □ Individual
□ Corporate Officer
Title(s)
□ Partner(s) □ Limited
□ General
□ Attorney-In-Fact
□ Trustee(s)
□ Guardian/Conservator
□ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Title or Type of Document
Number of Pages
Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power- of-Attorney to local representatives of the bonding company must also be attached.
END OF BID BOND
57 SECTION 00 43 25
SUBSTITUTION REQUEST
FORM - DURING
PROCUREMENT
DIVISION 00
100% CD - IFB 00 43 25-1
SUBSTITUTION REQUEST FORM - DURING PROCUREMENT
(Prior to Bid Opening – Minimum of (15) Calendar Days Prior to Receipt of Bids)
To: City Project Manager, City of Goleta
Project: Goleta City Hall HVAC Replacement Project (CIP 9137b)
Proposed Substitution:
Manufacturer:
Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.
Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.
The Undersigned certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
• Same warranty will be furnished for proposed substitution as for specified product. • Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Proposed substitution does not affect dimensions and functional clearances. • Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
Contractor: Substitution Request Number:
Specification Title: Description:
Section: Page: Article/Paragraph:
Address: Phone:
Trade Name: Model No.:
58 SECTION 00 43 25
SUBSTITUTION REQUEST
FORM - DURING
PROCUREMENT
DIVISION 00
100% CD - IFB 00 43 25-2
SUBMITTED BY:
The undersigned Contractor certifies that the function, appearance, and quality of the proposed substitution are equivalent or superior to those of the specified item.
Contractor Name Title
Signature Date
Address City/State/Zip
Telephone Email
A/E's REVIEW AND ACTION:
□ Substitution approved - Make submittals in accordance with Specification Section 01 60 00 Materials, Equipment, and Product Requirements. □ Substitution approved as noted - Make submittals in accordance with Specification Section 01 60 00 Materials, Equipment, and Product Requirements.
□ Substitution rejected - Use specified materials.
□ Substitution Request received too late - Use specified materials.
By:
A/E Representative Date
Supporting Data Attached:
☐ Drawings ☐ Product Data ☐ Samples ☐ Tests ☐ Reports ☐
END OF SECTION
59 100% CD - IFB 00 43 27-1
SECTION 00 43 27
SUMMARY OF COST AND BID BREAKDOWN DIVISION 00
GOLETA CITY HALL HVAC REPLACEMENT PROJECT
BID NO. 2026-006
Division # Division Description (as applicable) Division Total 01 General Conditions/Requirements
02 Existing Conditions
03 Concrete
04 Masonry
05 Metals
06 Wood, Plastics & Composites
07 Thermal & Moisture Protection
08 Openings
09 Finishes
10 Specialties
11 Equipment (Not Used)
12 Furnishings
13 Special Construction (Not Used)
14 Conveying System (Not Used)
21 Fire Suppression
22 Plumbing
23 Heating, Ventilating, & Air Conditioning (HVAC)
25 Integrated Automation (Not Used)
26 Electrical
27 Communications
28 Electronic Safety and Security
31 Earthwork
32 Exterior Improvements
33 Utilities
Other
Divisions Total
Overhead and Profit
Insurance
Cost of Payment, Labor/Material, and Performance Bonds
TOTAL BID AMOUNT (This amount must match the
amount entered on the Bid Form)
60 100% CD - IFB 00 43 27-2
SECTION 00 43 27
SUMMARY OF COST AND
BID BREAKDOWN
DIVISION 00
This is a preliminary breakdown required to be submitted within three (3) business days after bid opening by the three (3) apparent lowest bidders under Section 00 21 13 Instruction to Bidders, Part 5.15 (Submission of Cost Breakdown by Apparent Low Bidders). This form does not replace or take precedence over the Schedule of Values set and agreed to after award of the Contract.
Firm Name (as indicated on the Bid Form):
By:
(Signature of Bidder's Authorized Officer
or Representative)
(Typed or Printed Name)
Title:
Date:
END OF SECTION
61 SECTION 00 43 36
PROPOSED
SUBCONTRACTORS FORM
DIVISION 00
100% CD - IFB 00 43 36-1
1.01 DESIGNATION OF SUBCONTRACTORS
A. In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing at Section 4100), Part 1, Division 2 of the Public Contract Code of the State of California and any amendments thereof, Bidder shall set forth below: (a) the name and the location of the place of business, (b) the California contractor license number, (c) the DIR public works contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Bidder in or about the construction of the work or improvement to be performed under this Contract in an amount in excess of one-half of one percent (0.5%) of the Bidder's Total Bid Price.
B. If a Bidder fails to specify a subcontractor or if a contractor specifies more than one subcontractor for the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that portion of work and that it shall perform that portion itself.
NOTE 1: BIDDERS HAVE 24 HOURS AFTER THE BID DEADLINE TO SUBMIT DIR REGISTRATION NUMBERS.
NOTE 2: ATTACH ADDITIONAL SHEETS IF NECESSARY.
HEREWITH IS THE LIST OF SUBCONTRACTORS REFERENCED IN THE BID SUBMITTED BY:
(BIDDER)
(SIGNATURE)
(NAME AND TITLE)
TO (OWNER): CITY OF GOLETA
Dated and which is an integral part of the Bid Form.
CONTINUED ON NEXT PAGE
62 SECTION 00 43 36
PROPOSED
SUBCONTRACTORS FORM
DIVISION 00
100% CD - IFB 00 43 36-2
WORK TO BE
DONE BY
SUBCONTRACTOR
NAME OF
SUBCONTRACTOR
LOCATION
OF
BUSINESS
(CITY,
STATE)
CSLB
CONTRACTOR
LICENSE NO.
DIR
REGISTRATION
NUMBER (NOTE
1)
% OF
WORK
END OF SECTION
63 SECTION 00 45 13
BIDDER'S QUALIFICATIONS DIVISION 00
100% CD - IFB 00 45 13-1
PART 1 - BIDDER INFORMATION AND EXPERIENCE
1.01 INFORMATION ABOUT BIDDER
(Indicate ("N/A") where appropriate.)
Note: Where Bidder is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.
Name of Bidder:
A. Type, if Entity:
B. Bidder Address:
C. Facsimile (Fax) Number:
D. Telephone Number:
E. Email Address:
F. How many years have Bidder's organization been in business as a Contractor?
G. How many years has Bidder's organization been in business under its present name?
1. Under what other or former names has Bidder's organization operated?
H. If Bidder's organization is a corporation, answer the following:
1. Date of Incorporation:
2. State of Incorporation:
3. President's Name:
4. Vice-President's Name(s):
5. Secretary's Name:
6. Treasurer's Name:
I. If an individual or a partnership, answer the following:
1. Date of Organization:
2. Name and address of all partners (state whether general or limited partnership):
J. If other than a corporation or partnership, describe organization and name principals:
K. List other states in which Bidder's organization is legally qualified to do business.
L. What type of work does the Bidder normally perform with its own forces?
64 SECTION 00 45 13
BIDDER'S QUALIFICATIONS DIVISION 00
100% CD - IFB 00 45 13-2
M. Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:
N. Within the last five years, has any officer or partner of Bidder's organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:
O. List Trade References:
P. List Bank References (Bank and Branch Address):
Q. Name of Bonding Company and Name and Address of Agent:
R. Organizational Roles and Responsibilities : Provide a detailed description of the key personnel proposed for this project. Including their roles, responsibilities, and percentage of time allocated.
S. Superintendent Availability : Confirmation of the designated Superintendent assigned to this project and verification that they will be available for the full duration of construction.
T. Supporting Documentation of Capacity : Documentation demonstrating the firm’s ability to staff, manage, and deliver a project of this scale, including information on internal resources, field supervision structure, and administrative support.
U. Examples of Project Submittals: Provide at least two examples of project submittals prepared and processed on past projects of similar scope (e.g., MEP submittals, product data, shop drawings, or material approvals). Examples may be redacted as appropriate.
65 SECTION 00 45 13
BIDDER'S QUALIFICATIONS DIVISION 00
100% CD - IFB 00 45 13-3
V. Examples of Processed Applications for Payment and Schedule of Values: Samples of previously processed payment applications and corresponding schedules of values from comparable public construction projects, demonstrating familiarity with typical public -works payment protocols, cost loading, and documentation requirements. Examples may be redacted as appropriate.
ADDITIONAL SHEETS MAY BE USED AND ATTACHED
[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
66 SECTION 00 45 13
BIDDER'S QUALIFICATIONS DIVISION 00
100% CD - IFB 00 45 13-4
1.01 LIST OF CURRENT PROJECTS (BACKLOG)
Duplicate Page if needed for listing additional current projects.
Project Description of
Bidder's Work
Estimated
Completion Date
Cost of Bidder's
Work
67 SECTION 00 45 13
BIDDER'S QUALIFICATIONS DIVISION 00
100% CD - IFB 00 45 13-5
1.02 LIST OF COMPLETED PROJECTS – LAST THREE YEARS
Please include only those projects which are similar enough to demonstrate Bidder's ability to perform the required Work.
Duplicate Page if needed for listing additional current projects.
Project Description of
Bidder's Work
Completion Date Cost of Bidder's
Work
END OF SECTION
68 SECTION 00 45 46
GOVERNMENTAL
CERTIFICATIONS
DIVISION 00
100% CD - IFB 00 45 46-1
MUST BE SUBMITTED WITH BID
1.01 IRAN CONTRACTING CERTIFICATION
1.02 UKRAINE COMPLIANCE FORM
1.03 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
1.04 CONTRACTOR'S CERTIFICATION REGARDING WORKERS' COMPENSATION
1.05 FLEET COMPLIANCE CERTIFICATION
1.06 CERTIFICATE OF ASBESTOS AND LEAD-BASED PAINT (NEW WORK)
1.07 NON-COLLUSION DECLARATION
CONTINUED ON NEXT PAGE
69 SECTION 00 45 46
GOVERNMENTAL
CERTIFICATIONS
DIVISION 00
100% CD - IFB 00 45 46-2
1.01 IRAN CONTRACTING CERTIFICATION
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor's status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
The Contractor is not:
(1) identified on the current list of persons and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or (2) a financial institution that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.
The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.
The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.
Signature:
Printed Name:
Title:
Firm Name:
Date:
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years. 70 SECTION 00 45 46
GOVERNMENTAL
CERTIFICATIONS
DIVISION 00
100% CD - IFB 00 45 46-3
1.02 UKRAINE COMPLIANCE FORM
COMPLIANCE WITH ECONOMIC SANCTIONS
IN RESPONSE TO RUSSIA'S ACTIONS IN UKRAINE
SAPC Information Notice 22-15
Per Executive Order N-6-22, all contractors and grantees that have agreements valued at $5 million or more with agencies/departments subject to the California Governor's authority are directed to report to their contracting or grantor agency or department regarding their compliance with economic sanctions imposed by the U.S. government in response to Russia's actions in Ukraine, as well as sanctions imposed under state law, if any.
Instructions: Complete Section 1, provide a letter for Section 2 and return both to your CPA.
1) ATTESTATION OF COMPLIANCE:
Having conducted a good faith review, I attest that
(agency name) is in compliance with the economic sanctions imposed by the U.S. under state law, if any.
Contractor/Provider Name (Printed): Contract Number(s):
By (Authorized Signature):
Printed name and title of authorized signer:
Date of Signed Attestation of Compliance:
2) REPORT OF ACTIONS/STEPS TAKEN:
Attach a brief report to this notice form, on your agency letterhead describing the steps and actions, if any, you have taken in response to Russia's actions in Ukraine and to ensure compliance with the EO. Please note that responses may be subject to disclosure under the California Public Records Act. Accordingly, please do not include any confidential information or disclosures that could pose security risks. 71 SECTION 00 45 46
GOVERNMENTAL
CERTIFICATIONS
DIVISION 00
100% CD - IFB 00 45 46-4
1.03 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.
No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work.
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.1
Name of Bidder:
DIR Registration Number:
DIR Registration Expiration:
Small Project Exemption: Yes or _ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:
1. Bidder shall maintain a current DIR registration for the duration of the project.
2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.
3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.
Name of Bidder:
Signature:
Name and Title:
Dated:
1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.
72 SECTION 00 45 46
GOVERNMENTAL
CERTIFICATIONS
DIVISION 00
100% CD - IFB 00 45 46-5
1.04 CONTRACTOR'S CERTIFICATION REGARDING WORKERS' COMPENSATION
I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Name of Bidder:
Signature:
Name:
Title:
Dated:
73 SECTION 00 45 46
GOVERNMENTAL
CERTIFICATIONS
DIVISION 00
100% CD - IFB 00 45 46-6
1.05 FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct: