December 9, 2024
Patrick Dobbins
Public Works Director
City of Gonzales
147 4th Street
Gonzales, CA 93926
Subject: Amendment Consideration for Engineering Support Services During Bidding for Industrial Wastewater (IW) Conveyance Pipeline and Industrial Wastewater Treatment Facility (IWTF) Projects (Task Order 01)
Dear Patrick Dobbins:

Thank you for the opportunity to continue to be of service to the City of Gonzales (City). This letter proposal is presented to consider amendment of our task order for engineering support services during bidding of the Industrial Wastewater (IW) Conveyance Pipeline and Industrial Wastewater Treatment Facility (IWTF) Projects (Task Order 01), originally submitted and approved in June 2024. The original proposal included scope of services to assist with finalization of the IW conveyance pipeline bid and IWTF bidding documents, including update of design drawings, technical specifications and cost estimates, as well as additional services during bidding such as pre-bid meeting support, preparation of addenda and response to questions, bid evaluation support and conformed document preparation.

At the time the original proposal was prepared, Dudek had not yet been provided constructability comments on the IWTF design from the City’s and the City’s Construction Manager’s (MNS) review. Dudek was provided comments to these documents and has been working to incorporate these comments. The comments necessitated additional efforts, including from our subconsultants that were not included in the original scope of work and fee estimate including the following:
• Additional design efforts from architectural / HVAC sub (MBN) and electrical subconsultant (DTN) to incorporate ADA requirements at the IWTF Operations Building • Additional design efforts from structural engineer (Kelsey Structural) to address constructability comments and incorporate the latest California Building Code iteration (CBC 2022) • Additional design efforts from DTN to incorporate new SCADA standards TO: PATRICK DOBBINS
SUBJECT: AMENDMENT CONSIDERATION FOR ENGINEERING SUPPORT SERVICES DURING BIDDIGN FOR INDUSTRIAL

WASTEWATER CONVEYANCE PIPELINE AND INDUSTRIAL WASTEWATER TREATMENT FACILITY PROJECTS (TASK ORDER 01)
DECEMBER 2024 2
Additionally, the City has requested Dudek include in the IWTF bidding documents provisions for six (6) new groundwater monitoring wells to be installed near the existing and future ITWF percolation ponds.

As of early December, there remains a portion of the originally allocated budget for Task Order 01. However, that budget is expected to be expended within the next month. Dudek requests consideration of additional funds of $59,805. These additional funds would be utilized for the additional scope of services to complete the IWTF bid documents. Dudek anticipates completion of the bid documents by mid-December 2024.

We appreciate the City’s consideration of the above proposal. If you have any questions, please contact me at [email protected] or 760-479-4160.

Sincerely,
____________________________________
Kate Palmer, P.E.

Senior Project Manager
City of Gonzales
Phase 1B: Industrial Wastewater Treatment Facility - Amendment 1Engineering Services During Bidding (ESDB) DUDEK FEE ESTIMATEDecember 9, 2024
Project Team Role:

Program
Manager
IWTF
Manager
Senior
Engineer
Project
Engineer Hydrogeo
Team Member: TOTAL
DUDEK
DUDEK

LABOR OTHER DIRECT
Billable Rate : $265 $280 $255 $210 $280 HOURS COSTS Fee Fee Fee COSTS TOTAL FEE Task 1 Project Management and Project Status Reporting

1.1 Project Administration -$ -$
Subtotal Task 1 $ - $ - $ - $ - Task 2 Engineering Services During Bidding (ESDB)

2.1 Finalize IWTF Bidding Documents 16 24 16 24 36 116 30,160$ 2,346$ 8,245$ 19,054$ 59,805$

2.2 Pre-Bid Meeting Support -$ -$ 2.3 Addenda Preparation & Response to Questions -$ -$ -$ -$

2.4 Bid Evaluation Support -$ -$ 2.5 Conformed Plans & Specs Preparation -$ -$ -$ -$ Subtotal Task 2 16 24 16 24 36 116 $ 30,160 $ 2,346 $ 8,245 $ 19,054 $ - $ 59,805 Total Non-Optional Hours and Fee 16 24 16 24 36 116 $ 30,160 $ 2,346 $ 8,245 $ 19,054 $ - $ 59,805 Electrical
DTN
Subconsultant
Structural
Engineering
HVAC, Plumbing
Architectural
Kelsey
Structural
MBN