• Additional Survey and Utility Investigation: During the preparation of the BODR, the location of all the existing facilities was determined based on as-built information. An investigation to locate the existing effluent pipeline between the existing WWTP and the Aerated Ponds is recommended to support the design, as conflicting as-built information was found, and the actual location could not be determined. This pipeline will need to be located to allow for design coordination.

Praxis Land Surveying will update the topographic survey that they provided for the project with the result of their utility locating investigation. Praxis will also expand the topographic survey to include Walnut Ave from the WWTP to Thorp Ave to support the Walnut Avenue Extension (see below).
• Chemical and Electrical Building: The original agreement included a total of two buildings to house the main electrical adjacent the proposed packaged MBR locations, operations, administration, maintenance, and storage. The proposed plan is now to move the packaged MBR and provide the Administration/Operations Building and the Maintenance/Storage Building near the main site access location. It is recommended in the BODR that an additional building be included in the project to house the main power service adjacent to the MBR and the chemical storage facility.
• Expanded Headworks Facility: The original agreement assumed that the headworks would consist of a parshall flume for influent flow monitoring and duplex coarse bar screens with washer compactors sized to individually meet the peak flow condition. The BODR has expanded the headworks design to also include a vortex grit chamber for automated grit removal. The system includes a below grade structure for the vortex grit equipment with overflow weir, bypass channel, separate grit classifier and a grit pump. A Fats, Oils and Grease (FOG) removal system is also recommended in the BODR. The system includes a FOG skimmer trough located in the grit chamber, collection sump, FOG pumps, and a small rotary screen for dewatering of the FOG. The scope of work includes the addition of these facilities.
• Influent and Plant Drain Pump Station Structural Design: The original agreement included design for the influent pump station. It was assumed that a pre-cast wet well would be utilized. Based on the BODR, the recommended pump cannot fit inside a pre-cast wet well since this type of well is limited to a 10’ diameter. The structural design for a cast-inplace structure that was not in the original agreement is included, taking into account the structural design effort related to a pre-cast wet well design. The structural design for the Plant Drain Pump Station was not included in the original agreement and is thus added to the project.
• Updated Fine Screening Approach: The BODR recommends a centralized fine screening facility approach instead of a decentralized separate fine screen for each of the four MBR process trains as was included in the original agreement. With the decentralized approach, the MBR Vendor designs and supplies the fine screens and incorporates this process into the MBR procurement package. With the centralized screening facility, the bidding documents will include the full design for the screening facility. The approach outlined in the BODR includes a completely redundant system with a total of two screens, reducing the overall long-term maintenance of the fine screening facility, and promotes competition between screening manufacturers during bidding of the project. A MBR splitter box design is also added to the project and included in this facility. 174
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 3 ends

• 3W System: A 3W system was not included in the original agreement. This system will add a pressurized water system to the WWTP using MBR permeate as the water source. This system will be connected to all the process equipment that requires spray water, and to various locations throughout the plant where utility water for wash down is desired. It will include a 3W pump station, hydro-pneumatic tank, and distribution system. The 3W pump station wet well will share a wall with the effluent pump station wet well. The scope of work includes the additional effort for the 3W system, taking into account the effort included in the original agreement for the Effluent Pump Station structural design. • Effluent Pump Station System Modifications: The original agreement included a slab on grade for an effluent pump station skid. In the BODR, an alternative approach was recommended that includes a below grade water retaining structure. The structural design for this facility that was not in the original agreement is included. The scope of work includes the difference between the design of the below grade system recommended for the WWTP and the submersible pump system. The main differences in these approaches in terms of design for of the below grade structural design, and open channel flow hydraulics. The 3W Pump Station and Effluent Pump Station wet well have been incorporated into one structure to save on cost and space.
• Walnut Avenue Extension: The Project will require new utilities to be constructed in Walnut Avenue between the existing developed area of the City and the WWTP. These new utilities include extending 1) the existing City potable water distribution system, and 2) a new power feed, and 3) a proposed recycled water distribution main down Walnut Avenue between the WWTP site and Second Street. This proposal includes the design of these facilities and a new paved access road from the intersection of Walnut Avenue and Second Street to the northeast of the WWTP site. Paving Walnut Avenue in this area will help accommodate an increased volume of traffic and facilitate construction and long-term access to the WWTP.

Additionally, the paved road will facilitate access to the new utilities to be located in Walnut Avenue. The additional work will include stormwater management. • UV Disinfection System Modifications: The original agreement included a slab on grade for a packaged UV system. In the BODR, an alternative approach was recommended that includes a below grade water retaining structure and locating the UV system in a channel with two trains. The structural design for this facility that was not in the original agreement is included. The scope of work includes the difference between the design of the open channel low pressure system recommended for the WWTP and the closed vessel medium pressure system. The main differences in these approaches in terms of design is the additional of the below grade structural design, open channel flow hydraulics, and removal of the break tank and potential recirculation system.
• Recycled Water System: A recycled water distribution system was not included the original agreement. This system will allow for distribution of recycled water to the farms in the immediate vicinity of the WWTP. Facilities include a pump station, 12-inch recycled water distribution system extending from the Effluent Storage Ponds to Espinoza Road, then running around the northeast and southeast perimeter of the WWTP to Walnut Avenue, then extending west on Walnut Avenue to Second Street, and metered service connections. The total length of this distribution system is approximately 5,150 LF. To implement this system and Title 22 Engineers Report is also required, as well as permitting of the project through the Statewide General Order.
175
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 4 ends

Scope of Services
This scope of work summarizes the level of effort to incorporate the additional work into the existing project tasks.

Task 1 - Preliminary Design Report
The following items are added to Task 1.

Survey Investigation: Praxis will perform a ground penetrating radar survey with a goal to locate the existing clarified effluent pipeline that connect the WWTP to the aerated ponds using equipment specified in Exhibit A. Praxis will perform a field survey to locate markings and rectify any plans/atlas information and/or as-builts as provided by client with locate markings and surface evidence of utilities located in topographic mapping.

Perform field survey for topographic mapping purposes for the Walnut Avenue extension from the north-east corner of the WWTP site to and including the intersection of Walnut Avenue and Thorp Avenue. Praxis will conduct a recovery of existing project survey control. The topographical survey will include fences, roads, paved areas, buildings, trees, and surface utilities; as well as ground shots at a minimum of 50-foot grid and at tops, toes, flowlines, and grade breaks within and 10-ft beyond the existing right of way on either side. They will open storm drain and sewer manholes where possible to measure invert depth and identify the direction and size of pipes.

Deliverables
• Topographic and boundary mapping in AutoCAD/Civil 3D format including Civil 3D points, surface file, and all line work flattened to a zero elevation incorporated into the existing topographical survey.
• PDF of topographic mapping printable to scale.

Assumptions and Exclusions
• Every attempt will be made to access and trace out the 18-inch sewer pipe. There is no guarantee that the pipe will be fully accessible and able to be located to the full extent. • Project is subject to prevailing wage rates.
• Notification of on-site, and surrounding, owners and tenants of our work and presence and arrange access for survey crew will be by others.
• It is possible that the pipeline is located within the sod farm. Prior to work the City will contact the sod farm and get approval for survey crew to access the area. • The City will provide access to any locked facilities. • Construction observation, construction staking, subsurface utility research and mapping, topographic or utility mapping, hazardous substance identification and mapping, engineering design, permits, bonds, plan preparation, specifications, agency processing, boundary determination (including setting monuments and filing maps), and all other services not specifically listed in the above scope, are not included in this proposal.

Outside fees such as outside consultant’s fees, engineering fees, title report fees, agency fees, and any other fees not specified in this proposal are not included. 176
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 5 ends

Continued Geotech Consultation: Continued geotechnical consultation and geotechnical review of the contract documents will be provided to aid in detailed design.

Task 2 – Engineering Support for Financing and Environmental Review No additional budget is requested for this task.

Task 3 – Permitting Support
The following item is added to Task 3.

Title 22 Engineering Report: The scope of work will include preparing the NOI; Title 22 Engineering Report to include the production, delivery, and use of recycled water from the WWTP; and supporting information to have the project be permitted under the Statewide General Order for Recycled Water Use, Order No. 2016-0068-DDW. We shall prepare the draft NOI and Title 22 Engineering Report for City review. Comments on the draft permitting documents will be incorporated into the final report for submittal to the RWQCB.

Deliverables
• Draft and final NOI, Title 22 Engineering Report, and supporting information: Four hard copies and PDF
Task 4 – Detailed Design
HydroScience will complete detailed design as indicated in the original scope of work to include submitting plans, specifications, and cost estimates at the 50%, 90% and bid set levels of completion. A revised Sheet List and List of Specifications is attached to letter as Exhibit B.

The following updates to the original agreement will be incorporated:

1. Additional Site Civil Design: The plans will show the site grading improvements for the removal of the existing stormwater ponds, new equalization basin, and relocated stormwater pond. The proposed effort takes into account the design effort included in the original design to plan out the equalization/ emergency storage facilities using the existing ponds and credits the work to develop the site plan and one detail assuming that this work is similar to the original agreement. The additional design will include the excavation and backfill sections required for the new basins and up to two additional detail sheets. An over-excavation plan will be developed to allow the Contractor to install the soil stabilization layer recommended in the geotechnical report. Structural design and plans for a permanent retaining wall will be included along with a specification for a deferred design of temporary soldier piles that will be required for the over-excavation and installation of the permanent retaining wall. Design of the pond circulation equipment and polyethylene geomembrane liner will be provided for the equalization basin. The pond circulation equipment will be incorporated into the electrical design for power and control. A bypass plan for the existing clarified effluent pipeline will be developed in detailed design and included in the project. This will either be a temporary pump station or a new gravity bypass pipe that is required to provide WWTP from the existing plant to the existing aerated ponds during construction. 177
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 6 ends

2. Expanded Headworks Facility Design: The expanded headworks facility design will include the design of a grit removal system that includes a vortex grit chamber, bypass channel/isolation gates, grit pump, grit classifier, and grit conveyance. The expanded headworks design will also include the design of a manual FOG removal system that includes a rotating FOG skimmer trough with a spray system, progressive cavity sump pump, and externally fed rotary screen. An addition on one drawing that shows the sections and details of this system is included. Structural design for the vortex grit chamber, bypass channel and concrete slabs for the bin will be included. The vortex grit system will be incorporated into the electrical design for power and control.

3. Influent and Plant Drain Pump Station Structural Design: The structural design for the 14ft x 16ft x 17ft deep cast-in-place wet well with flow distribution channel will be added. The mechanical design for the Influent Pump Station was already included in the original agreement. The structural design for the top and bottom slab and support to specify the pre-cast concrete walls will be added to the design.

4. Updated Fine Screen Approach Design: The layout and structural design of the elevated 25ft x 27ft steel platform and 10ft x 30ft cast-in-place concrete flow splitting structure will be added to the design. A fine screen specification will be developed that allows for a minimum of two fine screen manufacturers or approved equal to bid the project.

5. Chemical and Electrical Building: The design of a 2,000 sq-ft CMU building with wood-framed roof on concrete spread footings will be included. A total of two mechanical sheets is anticipated for the layout plan, section and details of the building with some similar architectural detail utilized from the building design of the two other buildings included in the original agreement. The building will be incorporated into the electrical design for power and control and will include a lighting plan. Additional HVAC design sheets will be provided by Weston and Associates for venting in the chemical and cool/ heating in the electrical room.

6. 3W System Design: The 3W system will include an expanded wet well, vertical turbine pumps, disinfection system, distribution system, hydro-pneumatic tank system, and electrical power and control. The pump and distribution system will be hydraulically modelled using InfoWater by Innovyze. The hydraulic model will be used to generate system curves to aid in the selection of pumps. In addition, the hydraulic model will be used to analyze distribution system hydraulics while being fed by proposed pumps. The model will also be used to analyze pressures at each process requiring plant water to ensure the proper pressure is delivered. The 3W system will be added to the civil site, piping, and grading and paving plans. Two new mechanical sheets are anticipated to show the plan, section, and details of the 3W pump station and hydro-pneumatic tank. A specification for vertical turbine pumps and a packaged hydro-pneumatic tank system will be included. The hydro-pneumatic tank system will include a separate PLC, pressure control instrumentation, and a pressurized air system that includes a tank and dual compressor.

7. Walnut Avenue Extension: The Walnut Avenue extension will include design of the pavement section, up to six plan and profile drawings, up to two section drawings and up 178
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 7 ends

to four detail drawings for the roadway design. To support this effort a topographical survey to expand the existing topographic survey and geotechnical investigation described as is required:

Walnut Avenue Topographical survey: Perform field survey for topographic mapping purposes for the Walnut Avenue extension from the North-east corner of the WWTP site to and including the intersection of Walnut Avenue and Thorp Avenue. Praxis will conduct a recovery of existing project survey control. The topographical survey will be conducted within and 10-ft beyond the existing right of way on either side and will include fences, roads, paved areas, buildings, trees, and surface utilities; as well as ground shots at a minimum of 50-foot grid and at tops, toes, flowlines, and grade breaks. Open storm drain and sewer manholes where possible to measure invert depth and identify the direction and size of pipes. Storm Drain Culvert Crossing Inverts, including existing pipe sizing will also be determined.

Deliverables
• Topographic and boundary mapping in AutoCAD/Civil 3D format including Civil 3d points, surface file, and all line work flattened to a zero elevation incorporated into the existing topographical survey.
• PDF of topographic mapping printable to scale.

Assumptions and Exclusions
• Project is subject to prevailing wage rates.
• Notify on-site, and surrounding, owners and tenants of our work and presence and arrange access for survey crew.
• The County will provide access to any locked facilities. • Construction observation, construction staking, subsurface utility research and mapping, topographic or utility mapping, hazardous substance identification and mapping, engineering design, permits, bonds, plan preparation, specifications, agency processing, boundary determination (including setting monuments and filing maps), and all other services not specifically listed in the above scope, are not included in this proposal.

Outside fees such as outside consultant’s fees, engineering fees, title report fees, agency fees, and any other fees not specified in this proposal are not included.
• HydroScience in coordination with the County will determine the anticipated traffic index of the road based on the anticipated largest vehicle to access site and annual average daily traffic (AADT) provided by the County.

Walnut Avenue Geotechnical Investigation: To explore the subsurface conditions, we propose to drill up to seven borings within the roadway alignment.

The borings will be drilled to a maximum depth of 5 feet below the existing ground surfaces, as subsurface conditions dictate and allow, and will be drilled with either a G-Tech GT-8 drill rig equipped with 6-inch hollow stem auger or a Simco EP200 rig equipped with 4-inch outside diameter solid stem auger, with both rigs equipped with an automatic trip hammer for sampling. During the 179
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 8 ends

course of drilling, various soil samples will be obtained using ring-lined barrel samplers (ASTM D 3550, with shoe similar to D 2937). Bulk samples will be secured from the auger cuttings. Soils will be classified and logged in general accordance with the Unified Soil Classification System (ASTM D 2488). Copies of the boring logs will be included in the report. The borings will be backfilled with on-site material. Due to the limited vehicle traffic in the investigation area, we assume an encroachment permit and traffic control plans will not be required; however, we will provide cones delineating our work area.

Soil samples obtained from the borings will be tested in the laboratory to determine various engineering properties such as unit bulk moisture and density, maximum density and optimum moisture content, and R-value. The final numbers and types of tests to be performed will be determined by a Registered Professional Engineer, based upon the subsurface conditions encountered.

The field and laboratory data will be reviewed by a Registered Professional Engineer and evaluated with respect to development of geotechnical criteria for the project. The following items will be addressed in a brief letter:
• Site description, field and laboratory investigation
• Soil and groundwater conditions encountered
• Preparation of the project area prior to construction • Grading and backfill criteria, including overexcavations and remedial subgrade preparation (if any)
• HMA and PCC pavement section recommendations
• Drainage around improvements
• Observation and testing
The recommendations will not address issues in the domain of the contractor such as, but not limited to, site safety, subsidence of the site due to compaction, loss of volume due to stripping of the site, shrinkage of soils during compaction, excavatability, shoring, temporary slope angles, construction means and methods, etc. Testing of the soil for radioisotopes, lead or mold potential, asbestos (either naturally occurring or in man-made products), hydrocarbons, toxic substances, or other chemical properties are all beyond the scope of the proposed geotechnical investigation. Ancillary structures such as temporary access roads, fences, signage, and nonstructural fills are also not within our proposed work scope.

The road will be designed per the Geotechnical Investigation and to the agreed upon traffic index. It is anticipated that road width will be approximately 20-24 ft with two lanes and include a 2 ft shoulder. Storm drainage will be collected in culverts or ditches that span both sides of the road.

The utility plan will include a new potable water main, recycled water main with service laterals to the adjacent farmers, a dry utilities joint trench and storm drainage culvert crossing at all driveways. The existing sanitary sewer system will remain with potential adjustments to the rim elevations of the manholes. A new sanitary sewer connection to 180
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 9 ends

the new WWTP is also included in the design. A total of 6 utility plan and profile sheets are anticipated for the Walnut Avenue extension, and up to 1 additional utility plan and profile to show the installation of the potable water main between the intersection at 2nd Street to the intersection of Thorp Avenue within the existing roadway.

8. UV Disinfection System Modifications: The proposed low-pressure system will include a new below grade water retaining structure. The structural design for the 8 ft x 30 ft x various depths channel for UV equipment will be added to the project. The design for the UV Disinfection Equipment is similar in effort as the originally proposed system and the design for the UV Disinfection System Filtrate Break Tank, and Recirculation Pump Station is replaced by the open channel flow hydraulic design of the facility.

9. Recycled Water System Design: The recycled water system design includes the recycled water pump station, disinfection system, onsite recycled water force main, recycled water hydraulic modelling and recycled water metering service connection. The proposed pump station uses self-priming non-clog pumps to pump recycled water from the existing ponds, floating suction, liner upgrades for installation of the floating suction, concrete slab on grade. An automatic self-cleaning filter will be evaluated during design.

The disinfection system will be installed within a prefabricated enclosure and include a dosing system, chlorine residual analyzers, and chemical storage and containment. Up to two sheets to show the plan, section and details have been added to the plan sheets along with specifications for the floating suction, self-priming non-clog pumps, and automatic self-cleaning filter.

The recycled water pump station and distribution system will be modelled using InfoWater by Innovyze. System demand estimates for both average and peak conditions will be added to the model. The model will be used to generate system curves to aid in pump selection. In addition, selected pump characteristics including pump curves and design points can be incorporated into the model to analyze system hydraulics.

Deliverables
• 50%, 90% and 100% Plans, Specifications and Estimate of Probable Construction Costs as indicated in the original agreement with the additional facilities included. • Draft and Final Technical Memorandum to summarize the results of the 3W and RW system hydraulic modelling, in pdf format.

Assumptions and Exclusions

1. Soldier pile design will be provided by the Contractor as a deferred submittal during construction.

2. Fire protection systems design including fire alarm and sprinkler design shall be provided by the Contractor as a differed submittal.

3. Fire protection systems will be required for the Administration/Operations Building and Maintenance/Storage Building.

4. Fire protection systems will not be required for the Electrical/Chemical Building.

5. It is not expected that any additional right-of-way needs to be required to construct the project.

6. It is assumed that no new easements or real estate will be required to construct the project. 181
City of Greenfield
Wastewater Treatment Plant Upgrade Project
November 30, 2023

Page 10 ends

7. Pre-engineered canopies will be specified for the project with the Contractor providing the design as a deferred submittal during construction.

8. The sludge dewatering equipment specification will be specified as a packaged system that is provided by a single vendor or equal.

Task 5 & 6 – Engineering Support During the Bidding and Construction Phases No additional budget is requested for this task at this time. Engineering support during bidding and construction for the interim improvements and the additional level of effort needed for the updated design described above is not included in this scope and will be assessed at the completion of the design. HydroScience plans to use the existing budget from this task for the Interim Improvements upgrades.

Task 7 – Project Management
Includes the additional project management associated with the added project facilities. This includes up to 9 additional virtual meetings to extend the project design and discuss the additional facilities. All additional facility design will be reviewed by our QA/QC lead, Bill Slenter, prior to delivery to the City.

Proposed Budget
HydroScience will provide the above services on a time and materials basis, invoiced monthly, not to exceed a total budget amount of $647,037. A detailed breakdown of hours and charges is provided in Exhibit C to this letter. The fee will be added to our existing budget of tasks included in the original agreement as noted in the scope of work descriptions. Additional services, should they be required, would be billed on an hourly basis per the attached schedule of billing rates.

Schedule
HydroScience will coordinate the schedule for our work with the overall schedule of the project.

Should you have any questions regarding this proposal, please feel free to contact Curtis Lam at (530) 848-3938. We appreciate the opportunity to further support the City of Greenfield on this project.

Sincerely,
HydroScience Engineers
Curtis Lam
Principal
182
4 of 4
Exhibit “B” – Utility Locate Scope of Work & Equipment

SCOPE OF WORK
Underground Utility: We understand the scope of work on this project is to search for underground utilities in the areas defined by the client up to 6.3 acres for the area indicated in red and up to 1,645 linear feet indicated in pink. Without proper access to the line indicated in pink in the images shown in Exhibit “A”, GPRS may not be able to effectively locate the line. We will attempt to trace any utilities for which structures are visible from the work area. Utilities will be marked on the surface using paint, pin flags, or other appropriate means. The client will be responsible for providing drawings or notifying GPRS of any utilities entering the work area for which there are no apparent surface features or structures visible from the work area. To avoid additional charges, the areas should be laid out, marked, and cleared of obstructions before our arrival. Please visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.

EQUIPMENT
Underground Scanning GPR Antenna. This GPR Antenna uses frequencies ranging from 250 MHz to 450 MHz and is mounted in a stroller frame that rolls over the surface. Data is displayed on a screen and marked in the field in real-time. The surface needs to be reasonably smooth and unobstructed to obtain readable scans.

Obstructions such as curbs, landscaping, and vegetation will limit the efficacy of GPR. The total effective scan depth can be as much as 8’ or more with this antenna but can vary widely depending on the soil conditions and composition. Some soil types, such as clay, may limit maximum depths to 3’ or less. As depth increases, targets must be larger to be detected, and non-metallic targets can be challenging to locate. The depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Electromagnetic Pipe Locator. This receiver can passively detect the signals from live AC power or radio signals traveling along some conductive utilities. Operators can connect a transmitter directly to accessible metallic pipes, risers, or tracer wires to generate a current at a specific frequency. The receiver can then detect the resulting signal along the pipe or tracer wire. Various factors may impact this device’s effectiveness, including (but not limited to) access to the utility, conductivity, grounding, and interference from other utilities.

The depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Traceable Rodder. The rodder consists of a copper wire encased in fiberglass. This device is pushed through a pipe with direct access, such as a sewer line at a cleanout or a storm drain catch basin. Operators then induce a current on the wire and trace the signal from the surface. The maximum traceable depth is 10’ depending on the soil conditions, and the maximum distance is 200’. Inserting the rodder into deeper pipes within manholes may not be feasible depending on site conditions. GPRS will not access electrical conduits.

The signal is not detectable through metallic pipes. For more information, please visit: Link Robotic Crawler Camera. This modular, 6-wheel robotic video pipe inspection camera (crawler) is capable of 0° turns and equipped with varying wheel treads and sizes to adapt to most pipe applications. The crawler is typically used to inspect and locate pipes that are 8" in diameter and greater. The crawler is controlled by an operator at the surface using a remote control that allows for video to be viewed live during collection so observations can be made and noted as the crawler travels through the pipe. This camera is equipped with a 512 Hz sonde behind the camera head that can be located from above ground and provide the approximate depth to the pipe for pipes up to 10' deep. The locatable signal from the sonde does not pass through metal pipes or solid metal barriers except for cast-iron. Access through a structure such as a manhole, catch basin, etc. or an open pipe within arm's reach is required for inspection service and locating. When inserted, the camera can be directed through the pipe to a maximum of 1000'. For large diameter pipe applications (24" and above) the crawler can be coupled with the carriage that allows for larger and more rugged wheels to be attached and a lift that raises the camera head up to 18" allowing for the camera to be centered in the pipe for lines up to 36" in diameter. If the project requires entry into confined spaces to gain access to the subject piping, this will need to be coordinated by the client and a permit obtained if required. Video and photos of the interior of pipes can be provided along with inspection reports. Inspection reports are available upon request prior to execution of field work. For more information, please visit: Link Exhibit A
183
Exhibit B - Drawing List
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100%

GENERAL SHEETS
1 G001 Title Sheet, Vicinity Map, Location Map X X X X X X2 G002 Drawing Index X X X X X X3 G003 Standard Abbreviations & Piping Symbols Legends X X X X X X4 G004 General Notes X X X X5 G005 Construction Notes, City Standard Drawings, and SWPP Notes X X X X6 G006 Mitigation Measures X X X X7 G007 Process Flow Diagram X X X X X X8 G008 Hydraulic Profile - 1 X X X X X X9 G009 Hydraulic Profile - 2 X X X X X X 10 G010 Hydraulic Profile - 3 X X X X X X11 G011 System Design Data X X X X X

CIVIL SHEETS
12 C010 Parcel Map, Survey Notes, Benchmarks, and Monuments X X X X X X13 C011 Overall Existing Site Plan X X X X X X14 C012 Existing WWTP Parcel Site, Piping, and Demolition Plan X X X X X X15 C013 Enlarge WWTP Site and Piping Plan X X X X X X16 C014 Demolition Plan X X X X17 C015 Demolition Plan - Aerators18 C016 Demolition Details - 119 C017 Demolition Details - 220 C021 Overall Civil Site Plan X X X X X X 21 C022 WWTP Civil Site Plan X X X X X X
22 C031 Site Piping Plan Key Map X X X X X X23 C032 Site Piping Plan - 1 X X X X X X24 C033 Site Piping Plan - 2 X X X X X X25 C034 Recycled Water Pump Station Piping Plan and Profile X X X X X26 C035 Access Road Utility Plan & Profile - 1 X X X X X27 C036 Access Road Utility Plan & Profile - 2 X X X X X28 C037 Access Road Utility Plan & Profile - 3 X X X X X29 C041 Influent Sewer Plan and Profile X X X X30 C042 Walnut Ave Utility Plan & Profile - 1 X X X31 C043 Walnut Ave Utility Plan & Profile - 2 X X X32 C044 Walnut Ave Utility Plan & Profile - 3 X X X Project: Wastewater Treatment Plant Upgrade ProjectClient: City of Greenfield HSE Only 184
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100% 33 C045 Walnut Ave Utility Plan & Profile - 4 X X X34 C046 Walnut Ave Utility Plan & Profile - 5 X X X35 C047 Walnut Ave Utility Plan & Profile - 6 X X X36 C048 Potable Water Pipeline Plan & Profile X X X37 C051 Site Grading and Paving Plan X X X X X X38 C052 Site Grading Plan - 1 X X X X X39 C053 Site Grading Plan - 2 X X X X X40 C054 Site Grading Detail Plan - 1 X X X X X41 C055 Site Grading Detail Plan - 2 X X X X X42 C056 Site Grading Detail Plan - 3 X X X X X43 C057 Site Grading Detail Plan - 4 X X X X X44 C058 Retaining Wall Plan, Section and Detials X45 C059 Retaining Wall Detials X46 C061 Walnut Road Plan and Profile - Sta 0+00 to 5+50 X X X47 C062 Walnut Road Plan and Profile - Sta 5+50 to 11+00 X X X48 C063 Walnut Road Plan and Profile - Sta 11+00 to 16+50 X X X49 C064 Walnut Road Plan and Profile - Sta 16+50 to 22+00 X X X50 C065 Walnut Road Plan and Profile - Sta 22+00 to 27+50 X X X51 C066 Walnut Road Plan and Profile - Sta 27+50 to 33+00 X X X52 C067 Walnut Road Sections X X X53 C068 Walnut Road Sections X X X54 C071 Walnut Road Details X X X55 C072 Walnut Road Details X X X56 C073 Walnut Road Details X X X57 C074 Walnut Road Details X X X58 C301 Equalization Basin Site Plan X X X X X59 C302 Equalization Basin Sections X X X X60 C311 Stormwater Retention Basin Site Plan X X X X X61 C312 Stormwater Retention Basin Sections X X X X62 C391 Pond Details - 1 X X X X X63 C392 Pond Details - 2 X X X X64 C393 Pond Details - 3 X X X X65 C901 Civil Details - 1 X X X X X66 C902 Civil Details - 2 X X X X X67 C903 Civil Details - 3 X X X X X68 C904 Civil Details - 4 X X X X X69 C905 Civil Details - 5 X X X X X70 C906 Civil Details - 6 X X X X71 C907 Civil Details - 7 X X X X 185
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100% 72 C908 Civil Details - 8 X X X X73 C909 Civil Details - 9 X X X X74 C910 Civil Details - 10 X X X X75 C911 Civil Details - 11 X X X X76 C912 Civil Details - 12 X X X X77 C913 Civil Details - 13 X X X X78 C919 Civil Details - 14 X X X X79 C920 Civil Details - 15 X X X X

MECHANICAL SHEETS
80 M101 Administration/ Operations Building Equipment Plan X X X X X81 M111 Maintenance/ Storage Building Equipment Plan X X X X X 82 M141 Electrical and Chemical Building Equipment Plan X X X X83 M142 Electrical and Chemical Building Section & Details X X X X84 M201 Headworks Mechanical Plan X X X X X X85 M202 Coarse Screen Section and Details X X X X X86 M203 Vortex Grit Section and Details X X X X87 M351 Plant Drain Pump Station Plan and Section X X X X X88 M352 Plant Drain Pump Station Section and Details X X X X X89 M401 Influent Pump Station Equipment Plan and Section X X X X X X90 M402 Influent Pump Station Equipment Sections and Details X X X X X91 M451 Fine Screens and MBR Flow Splitter Plan X X X X X92 M452 Fine Screens Equipment Section & Details X X X X93 M453 MBR Flow Splitter Section & Details X X X X94 M501 Packaged MBR Overall Layout X X X X95 M502 Packaged MBR Mechnical Plan - 1 X X X X96 M503 Packaged MBR Mechnical Plan - 2 X X X X97 M504 Packaged MBR Mechnical Plan - 3 X X X X98 M505 Packaged MBR Mechnical Plan - 4 X X X X99 M506 Packaged MBR Mechnical Plan - 5 X X X X 100 M511 Packaged MBR Sections, Tie-ins, and Details - 1 X X X X101 M512 Packaged MBR Sections, Tie-ins, and Details - 2 X X X X102 M513 Packaged MBR Sections, Tie-ins, and Details - 3 X X X X103 M514 Packaged MBR Sections, Tie-ins, and Details - 4 X X X X104 M515 Packaged MBR Sections, Tie-ins, and Details - 5 X X X X105 M516 Packaged MBR Sections, Tie-ins, and Details - 6 X X X X106 M517 Packaged MBR Sections, Tie-ins, and Details - 7 X X X X 186
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100% 107 M518 Packaged MBR Sections, Tie-ins, and Details - 8 X X X X108 M519 Packaged MBR Sections, Tie-ins, and Details - 9 X X X X109 M520 Packaged MBR Sections, Tie-ins, and Details - 10 X X X X110 M601 UV Disinfection System Plan X X X X X X111 M602 UV Disinfection System Section and Details X X X X X112 UV Disinfection System Filtrate Break Tank, and Recirculatin Pump Station Plan and Section X113 M651 Effluent and 3W Pump Station Plan and Section X X X X X114 M652 Effluent Pump Station Section and Details X X115 M653 3W Pump Station Section and Details X116 M654 Hydro-pnuematic Tank Plan and Section X117 M701 Recycled Water Pump Station Equipment Plan and Sections X X X X X118 M702 Recycled Water System Details X119 M801 Solids Handling Facility Plan and Sections X X X X X X120 M802 Solids Handling Facility Section and Details X X X X X121 M803 Solids Handling Facility Section and Details X X X X X122 M901 Mechanical Details - 1 X X X X X123 M902 Mechanical Details - 2 X X X X X124 M903 Mechanical Details - 3 X X X X X125 M904 Mechanical Details - 4 X X X X X126 M905 Mechanical Details - 5 X X X X X127 M906 Mechanical Details - 6 X X X X128 M907 Mechanical Details - 7 X X X X129 M908 Mechanical Details - 8 X X X X130 M909 Mechanical Details - 9 X X X X131 M910 Mechanical Details - 10 X X X X

ARCHITECTURAL SHEETS
132 A001 General Architectural Notes133 A002 General Architectural Notes134 A101 Operations Building Plan X135 A102 Operations Building Section and Details136 A103 Operations Building Equipment 137 A104 Operations Building Equipment 138 A105 Operations Building Equipment 139 A106 Operations Building Equipment140 A901 Architectural Details - 1141 A902 Architectural Details - 2

STRUCTURAL SHEETS
187
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100% 142 S001 General Structural Notes143 S002 General Structural Notes144 S101 Structural Operations Building Plans145 S102 Structural Operations Building Sections and Detials146 S151 Structural Electrical and Chemical Building Plan147 S152 Structural Electrical and Chemical Building Section and Detials148 S201 Structural Headworks Plan and Section149 S401 Structural Influent Pump Station Plan and Section150 S402 Structural Fine Screening Plan and Section151 S501 Structural Treatment Equipment Pad Plan and Section152 S502 Structural UV Disinfection System Based Plans153 S601 Structural UV Disinfection System Based Sections154 S651 Structural Transfer Pump Station Plan155 S701 Structural Recycled Water Pump Station Plan156 S801 Structural Solids Handling Facility Pad Plan and Section157 S901 Structural Details - 1158 S902 Structural Details - 2

ELECTRICAL SHEETS
159 E001 Standard Electrical Symbols, Legend and Abbreviations X X X X X X 160 E010 Oneline Diagram Treatment X X X X X X
161 E011 Electrical Panel Elevations X X X X162 E020 Panelboard and Light Fixture Schedule X X X X163 E021 Conduit and Conductor Routing Schedule - 1 X X X X164 E022 Conduit and Conductor Routing Schedule - 2 X X X X165 E023 Conduit and Conductor Routing Schedule - 3 X X X166 E030 Control Wiring Diagram X X X X167 E031 Wiring Diagrams - 1 X X X X168 E032 Wiring Diagrams - 2 X X X X169 E033 Wiring Diagrams - 3 X X X X170 E034 Wiring Diagrams - 4 X X X X171 E033 Wiring Diagrams - 5 X X X172 E034 Control Panel Wiring Diagram -1 X X X X173 E035 Control Panel Wiring Diagram -2 X X X X174 E036 Control Panel Wiring Diagram -3 X X X175 E040 Control Block Diagram X X X X176 E041 Control Network Diagram X X X X 188
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100% 177 E061 Electrical Site Plan X X X X X178 E071 Lighting and Grounding Site Plan X X X X X179 E101 Administation/Operations and Maintenance/Storage Buildings Electrical Plan X X X X180 E151 Electrical and Chemical Building Electrical Plan X X X X X181 E152 Electrical and Chemical Building Electrical Lighting Plan X182 E200 Headworks Electrical Plan X X X X X183 E401 Influent Pump Station Electrical Plan X X X X X184 E451 Fine Screens Electrical Plan X X X X185 E501 MBR Equipment Electrical Plan X X X X X186 E601 UV Disinfection System Electrical Plan X X X X X187 E651 Transfer Pump Station Electrical Plan X X X X188 E701 Recycled Water Pump Station Electrical Plan X X X X189 E801 Solids Handling Facility Electrical Plan X X X X X190 E050 Electrical Details - 1 X X X X191 E051 Electrical Details - 2 X X X X192 E052 Electrical Details - 3 X X X X193 E053 Electrical Details - 4 X X X X194 E054 Electrical Details - 5 X X X X

HVAC SHEETS
195 H001196 H002197 H003
FIRE PROTECTION SHEETS Will instead provide specification and differed submittal 198 FP001199 FP002200 FP003

PLUMBING SHEETS
201 P001202 P002203 P003

PROCESS AND INSTRUMENTATION SHEETS
204 I001 Process and Instrumentation Standard Symbols, Legends and Abbreviations X X X X X205 I002 Process and Instrumentation Diagram - 1 X X X X X206 I003 Process and Instrumentation Diagram - 2 X X X X X207 I004 Process and Instrumentation Diagram - 3 X X X X X 189
Sheet No. Drawing Title Original Agreement Including Amendment 30% (PDR) 50% 90% 100% 208 I005 Process and Instrumentation Diagram - 4 X X X X X209 I006 Process and Instrumentation Diagram - 5 X X X X X210 I007 Process and Instrumentation Diagram - 6 X X X X X211 I008 Process and Instrumentation Diagram - 7 X X X X X212 I009 Process and Instrumentation Diagram - 8 X X X X X213 I010 Process and Instrumentation Diagram - 9 X X X X X214 I011 Process and Instrumentation Diagram - 10 X X X X X215 I012 Process and Instrumentation Diagram - 11 X X X X X216 I013 Process and Instrumentation Diagram - 12 X X X X X217 I014 Process and Instrumentation Diagram - 13 X X X X X218 I015 Process and Instrumentation Diagram - 14 X X X X X219 I016 Process and Instrumentation Diagram - 15 X X X X X209 I017 Process and Instrumentation Diagram - 16 X X X X X210 I018 Process and Instrumentation Diagram - 17 X X X X X211 I019 Process and Instrumentation Diagram - 18 X X X X X212 I020 Process and Instrumentation Diagram - 19 X X X X X213 I021 Process and Instrumentation Diagram - 20 X X X X X214 I022 Process and Instrumentation Diagram - 21 X X X X X215 I023 Process and Instrumentation Diagram - 22 X X X X X216 I024 Process and Instrumentation Diagram - 23 X X X X217 I025 Process and Instrumentation Diagram - 24 X X X X218 I026 Process and Instrumentation Diagram - 25 X X X X219 I027 Process and Instrumentation Diagram - 26 X X X X220 I017 Process and Instrumentation Diagram - 27 X X X X221 I018 Process and Instrumentation Diagram - 28 X X X X222 I019 Process and Instrumentation Diagram - 29 X X X X223 I020 Process and Instrumentation Diagram - 30 X X X X224 I021 Process and Instrumentation Diagram - 31 X X X X225 I022 Process and Instrumentation Diagram - 32 X X226 I023 Process and Instrumentation Diagram - 33 X X227 I024 Process and Instrumentation Diagram - 34 X X X228 I025 Process and Instrumentation Diagram - 35 X X X Totals 153 199 29 102 190 190
X=Included with submittal
TBD
X Additional Drawing included as part of Amendment 1
190
Exhibit B - Specification List
Section Title Original
Proposal
Added in
Amend 1 MBR RFP 50% 90% 100%
Division 0 - (00000) - Procurements and Contracting
00010 TABLE OF CONTENTS X X X X
Bidding Requirements
00020 INVITATION TO BID X X X
00100 INSTRUCTIONS TO BIDDERS X X X
00200 INFORMATION AVAILABLE TO BIDDERS X X X
00220 GEOTECHNICAL DATA X X X
00300 BID X X X
00310 BID SCHEDULE X X X
00410 BID GUARANTY BOND X X X
00420 CERTIFICATION OF BIDDER’S EXPERIENCE & QUALIFICATIONS X X X 00430 PROPOSED SUBCONTRACTORS X X X
00450

SCHEDULE OF MANUFACTURERS AND SUPPLIERS MAJOR

EQUIPMENT AND MATERIAL ITEMS X X X
00480

NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND

SUBMITTED WITH BID X X X
00490 ASSIGNMENT OF EQUIPMENT SUPPLY AND SERVICES AGREEMENT X X X 00500 AGREEMENT X X X
00500 APPENDIX X X X
X X X
Contract Forms X X X
00610 PERFORMANCE BOND X X X
00620 PAYMENT BOND X X X
00650 WORKER'S COMPENSATION INSURANCE CERTIFICATE X X X 00670 ESCROW BID DOCUMENTS X X X
Contract Conditions
00700 GENERAL PROVISIONS X X X
Division 1 - (01000) - General Requirements
01010 SUMMARY OF WORK X X X X X
01014 WORK SEQUENCE X X X X
01025 MEASUREMENT AND PAYMENT X X X
01050 SURVEY WORK X X X
01060 REGULATORY REQUIREMENTS X X X
01061 SAFETY & HEALTH X X X
01071 STANDARD REFERENCES X X X
01201 PROJECT MEETINGS X X X
01300 SUBMITTALS X X X X
01301 SCHEDULE OF VALUES X X X
01311 SCHEULING AND REPORTING X X X
01360 OPERATING & MAINTENANCE INFORMATION X X X
01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS X X X 01540 SECURITY X X X
01600 MATERIAL & EQUIPMENT SUBSTITUTION X X X
01610 SEISMIC ANCHORAGE AND BRACING X X X X
01611 SEISMIC DESIGN REQUIREMENTS X X X X
01615 WIND DESIGN CRITERIA X X X X
01620 PROTECTION OF MATERIALS & EQUIPMENT X X X
01660 TESTING AND STARTUP X X X X
01661 INSTRUCTION OF OPERATORS & MAINTENANCE PERSONNEL X X X 01700 RESTORATION OF IMPROVEMENTS X X X
01710 FINAL CLEANING X X X
01720 RECORD DRAWINGS X X X
01757 DISINFECTION X X X
01760 SPARE PARTS AND MAINTENANCE MATERIALS X X X
01900 SEISMIC CRITERIA AND BRACING REQUIREMENTS X X X
Project: Wastewater Treatment Plant Upgrade Project
Client: City of Greenfield
191
Section Title Original
Proposal
Added in
Amend 1 MBR RFP 50% 90% 100%
Division 2 - (02000) - Sitework
02055 DEMOLITION AND SITE PREPARATION X X X X
02140 DEWATERING X X X X
02200 EARTHWORK X X X X
02222 EXCAVATING, BACKFILLING AND COMPACTING FOR UTILITIES X X X X 02312 CONTROLLED LOW STRENGTH MATERIAL X X X X
02350 SHEETING, SHORING AND BRACING X X X X
02500 ASPHALT CONCRETE PAVING X X X X
02620 FILTER FABRIC X X X X
02667 TESTING OF HYDRAULIC STRUCTURES X X X X
02675 DISINFECTION OF RECYCLED WATER DISTRIBUTION SYSTEMS X X X X 02775 ELASTOMERIC POLYURETHANE PROTECTIVE COATINGS X X X X 02832 CHAIN LINK FENCES X X X X
Division 3 - (03000) - Concrete
03055 EPOXY BONDING X X X X
03100 CONCRETE FORMWORK X X X X
03200 REINFORCEMENT STEEL X X X X
03280 JOINTS IN CONCRETE PAVEMENT X X X X
03290 JOINTS IN CONCRETE STRUCTURES X X X X
03300 CAST-IN-PLACE STRUCTURAL CONCRETE X X X X
03310 CAST-IN-PLACE SITEWORK CONCRETE X X X X
03315 GROUT X X X X
03400 PRECAST CONCRETE X X X X
Division 4 - (04000) - Mansonry
04232 REINFORCED CONCRETE BLOCK MASONRY X X X X
Division 5 - (05000) - METALS
05410 STRUCTURAL METAL STUD FRAMING X X X
05500 METAL FABRICATIONS X X X X X
05501 ANCHOR BOLTS AND ANCHORING DEVICES X X X X X
05520 ALUMINUM HANDRAILING X X X X X
05910 HOT-DIP ZINC COATING X X X X
Division 6 - (06000) - WOOD
06110 FRAMING AND SHEATHING X X X X
06190 PREFABRICATED WOOD TRUSSES X X X X
06200 FINISH CARPENTRY X X X
06831 FIBERGLASS REINFORCED PANELS X X
Division 7 - (07000) - THERMAL AND MOISTURE PROTECTION
07190 WATER REPELLENTS X X X X
07210 BOARD INSULATION X X X X
07213 BATT AND BLANKET INSULATION X X
07361 ASPHALT SHINGLE ROOFING X X
07410 METAL ROOF PANELS X X X
07461 SIDING X X X
07600 FLASHING AND SHEET METAL X X X
07900 SEALANTS & CAULKING X X X
Division 8 - (08000) - DOORS AND WINDOWS
08110 STEEL DOORS AND FRAMES X X X
08310 ALUMINUM ACCESS HATCHES X X X X
08331 OVERHEAD COILING DOORS X X X
08620 UNIT SKYLIGHTS X X X
08710 DOOR HARDWARE X X X
192
Section Title Original
Proposal
Added in
Amend 1 MBR RFP 50% 90% 100%
Division 9 - (09000) - FINISHES
09260 GYPSUM BOARD ASSEMBLIES X X
09800 ARCHITECTURAL PAINTING X X X X
09900 PROTECTIVE COATING SYSTEMS X X X X X
09652 RESILIENT TILE FLOORING X X
Division 10 - (10000) - SPECIALTIES
10405 ACCIDENT PREVENTION SIGNS X X X X
10523 FIRE EXTINGUISHERS X X X X
Division 11 - (11000) - EQUIPMENT
11010 GENERAL REQUIREMENTS FOR EQUIPMENT X X X X
11050 COMMON WORK RESULTS FOR EQUIPMENT X X X X
11050 EQUIPMENT MOUNTING X X X X
11060 ELECTRIC MOTORS X X X X
11070 EQUIPMENT INSTALLATION TESTING AND STARTUP X X X X 11100 AUTOMATIC SELF-CLEANING FILTER X X X X
11110 POND CIRCULATION EQUIPMENT X X X X
11200 HYDROPNEUMATIC TANK X X X X
11242 CHEMICAL METERING PUMP SKID SYSTEMS X X X X X
11250 COMMON MOTOR REQUIREMENT FOR WASTEWATER EQUIPMENT X X X X 11294 STAINLESS STEEL SLUICE GATES X X X X
11300 MECHANICALLY CLEANED BAR SCREENS X X X X
11310 WASHER COMPACTOR X X X X
11317 HIGH SPEED SUBMERSIBLE MIXERS X X X X X
11322 SELF-PRIMING NONCLOG PUMPS X X X X
11330 ROTATING FOG SKIMMER THROUGH X
11331 EXTERNALLY FED ROTARY SCREEN X
11392 VORTEX GRIT REMOVAL SYSTEM X X X X
11400 PACKAGED MBR TREATMENT SYSTEMS X X X X X
11410 BLOWERS X X X X X
11450 ULTRAVIOLET DISINFECTION SYSTEM X X X X
11500 PROCESS PUMPS X X X X X
11520 VERTICAL TURBINE PUMPS X X X X
11525 HORIZONTAL SELF PRIMING CENTRIFUGAL PUMPS X X X X 11530 SUBMERSIBLE SEWAGE PUMPS X X X X
11535 END-SUCTION SPLIT-COUPLED CENTRIFUGAL PUMPS X X X X 11600 SERVICE WATER BOOSTER STATION X X X X
11635 AUTOMATIC SAMPLERS X X X X
11650 PROCESS FINE SCREENING EQUIPMENT X X X X
11665 TOOLS, EQUIPMENT, AND LABORATORY SUPPLIES X X X X 11675 AIR COMPRESSORS X X X X
11700 AERATION DIFFUSER SYSTEMS X X X X
11850 SUBMERGED ULTRAFILTRATION MEMBRANES X X X X
Division 12 - (12000) - FURNISHINGS
12060 TOILET ROOM ACCESSORIES X X
Division 13 - (13000) - SPECIAL CONSTRUCTION
13100 CATHODIC PROTECTION X X X X
13120 PRE FABRICATED ENCLOSURE X X X X
13123 PRE-FABRICATED FRP ENCLOSURE X
13200 POLYETHYLENE GEOMEMBRANE LINER X X X X
13222 PREFABRICATED CLEARWELL BAFFLES X
13300 PACKAGED SLUDGE DEWATERING SYSTEMS X X X X
13441 DISINFECTION CONTROL SYSTEM X X X X
193
Section Title Original
Proposal
Added in
Amend 1 MBR RFP 50% 90% 100%
Division 15 - (15000) - Mechanical
15010 BASIC MECHANICAL REQUIREMENTS X X X X X
15050 PROCESS PIPING X
15055 PIPING MATERIALS AND COMPONENTS X X X X
15060 PIPING AND APPURTANANCES X X X X
15060 PIPING SYSTEMS X X X X
15061 STEEL PIPE X X X X
15062 DUCTILE IRON PIPE X X X X X
15064 PVC PIPE X X X X
15066 COPPER PIPE X X X X
15067 STAINLESS STEEL PIPE X X X X X
15068 STAINLESS STEEL TUBING X X X X X
15075 HDPE PIPE X X X X
15090 PIPE SUPPORTS X X X X
15100 VALVES AND MISCELLANEOUS COMPONENTS X X X X
15120 PROCESS VALVES AND APPURTENANCES X X X X
15140 VALVE AND GATE OPERATORS X X X X
15145 ELECTRIC ACTUATORS X X X X
15150 VALVE AND PIPING ACCESSORIES X X X X
15190 MECHANICAL IDENTIFICATION X X X X
15200 STATIC MIXERS X X X X
15240 MECHANICAL EQUIPMENT SOUND, VIBRATION, AND SEISMIC CONTROL X X X X 15260 REINFORCED CONCRETE PIPE X X X X
15293 DOUBLE CONTAINMENT PIPING X X X X
15400 PLUMBING FIXTURES AND EQUIPMENT X X X X
15430 EMERGENCY EYE/FACE WASH EQUIPMENT X X X X
15515 COMMON WORK RESULT FOR PROCESS VALVES X X X X
Division 16 - (16000) - ELECTRICAL
16010 GENERAL ELECTRICAL PROVISIONS X X X X
16011 PROTECTIVE DEVICE COORDINATION STUDY & ARC FLASH ANALYSIS X X X 16030 ELECTRICAL TESTS X X X
16100 GENERAL ELECTRICAL WORK X X X
16110 RACEWAYS, FITTINGS, AND SUPPORTS X X X
16115 JUNCTION AND DEVICE BOXES AND FITTINGS X X X
16120 WIRE AND CABLES, 600 VOLTS AND BELOW X X X
16123 FIBER OPTIC COMMUNICATIONS X X X
16125 MANHOLES, HANDHOLES, AND PULL BOXES X X X
16127 SUMP TERMINIATION CABINET X X X
16130 WIRING DEVICES X X X
16140 DISCONNECTS AND FUSED SWITCHES X X X
16155 MOTOR STARTERS X X X
16160 PILOT DEVICES X X X
16200 OVERCURRENT PROTECTIVE DEVICES X X X
16208 STANDBY GENERATOR AND ACCESSORIES X X X
16250 MOTOR CONTROL CENTERS X X X
16261 AUTOMATIC TRANSFER SWITCH X X X
16300 ELECTRICAL SERVICE EQUIPMENT X X X
16310 PANEL BOARDS X X X
16320 SURGE PROTECTIVE DEVICES X X X
16324 UNITERRUPTIBLE POWER SUPPLY X X X
16325 DRY-TYPE TRANSFORMERS X X X
16330 VARIABLE FREQUENCY DRIVES X X X
16335 ACTIVE HARMONIC FILTER X X X
16400 ELECTRIC SERVICE X X X
16450 GROUNDING X X X
16500 LIGHTING FIXTURES AND ACCESSORIES X X X
194
Section Title Original
Proposal
Added in
Amend 1 MBR RFP 50% 90% 100%
Division 17 - (17000) - INSTRUMENTATION
17001 PROCESS CONTROL X X X
17010 GENERAL REQUIREMENTS, INSTRUMENTATION X X X
17110 INSTRUMENTATION AND CONTROL SYSTEMS X X X
17201 CONTROL PANELS X X X
17400 VARIABLE FREQUENCY DRIVES X X X
17500 ANALYTICAL INSTRUMENTS X X X
17505 LIQUID PRESSURE PROCESS MEASUREMENT DEVICES X X X 17506 EXTENDED WARRANTY & MAINTENANCE X X X
17510 FLOW PROCESS MEASUREMENT DEVICES X X X
17520 LEVEL PROCESS MEASUREMENT DEVICES X X X
17510 FACTORY ACCEPTANCE TESTS X X X
17512 SITE ACCEPTANCE TESTS X X X
17520 MBR PROCESS CONTROL X X X
TBD
Additional Drawing included as part of Amendment 1
May not be required
195
City of Greenfield WWTP Upgrade Project - Fee Amendment Request 1 HydroScience Engineers
November 30, 2023
Engineering Design Service Fee - Amendment Request 1
City of Greenfield - WWTP Improvements Project
Task Description
Bill SlenterPrincipal-in-ChargeCurtis LamProject ManagerEric JonesProject EngineerThinh LeEIC LeadMay HuangCivil/MechanicalKyle FooksCivil/MechanicalStaff EngineerCivil/MechanicalMarc FernandezSite Grading and Road DesignAngela SingerFunding/Recycld WaterEric PetrelPipingMark DudleyEIC TeamMike HernandezEIC TeamDraftingLabor HoursFeeDirect CostsVE SolutionsStructuralEarth SystemsGeotechnicalPraxis Land SurveyingWeston & AssociatesDirect Charges MarkupExpense Subtotal with MarkupTotal FeePhase Totals 2024 Billing Rate $297 $297 $249 $249 $227 $201 $184 $211 $259 $287 $238 $211 $156 1 Preliminary Design Report/30% PS&E $54,172
Survey Investigation 4 8 16 28 $5,683 $12,000 $1,200 $13,200 $18,883 Continued Geotechnical Support 4 8 6 2 20 $4,696 $5,000 $500 $5,500 $10,196 Interim Sludge Dewatering Improvements 2 40 20 20 82 $18,213 $0 $18,213 RW Customer Outreach 4 12 21 37 $6,881 $0 $6,881
2 Engineering Support for Financing and Environmental Review $0 3 Permitting Support $22,924
Title 22 Engineering Report 5 10 60 20 95 $21,824 $1,000 $100 $1,100 $22,924 4 Detailed Design $545,316
Additional Site Civil Design 6 23 10 64 39 50 20 28 240 $49,697 $18,275 $1,828 $20,103 $69,799 Expanded Headworks Facility Design 5 20 20 10 14 8 77 $17,183 $11,000 $1,100 $12,100 $29,283 Influent Pump Station Structural Design 5 10 15 $3,250 $17,000 $1,700 $18,700 $21,950 Plant Drain Pump Station Structural Design 0 $0 $9,200 $920 $10,120 $10,120 Updated Fine Screen Approach Design 4 20 20 40 30 15 30 159 $32,946 $29,750 $2,975 $32,725 $65,671 Chemical and Electrical Building Design 4 10 10 20 40 20 20 124 $24,877 $12,325 $6,000 $1,833 $20,158 $45,034 3W System Design 4 12 40 25 46 4 32 34 233 $49,866 $12,750 $1,275 $14,025 $63,891 Walnut Avenue Extention 10 20 101 377 171 679 $134,523 $10,300 $19,500 $2,980 $32,780 $167,303 UV Disinfection System Modifications 5 10 15 $3,250 $17,000 $1,700 $18,700 $21,950 Recycled Water System Design 6 9 20 39 39 40 32 221 $45,613 $4,275 $428 $4,703 $50,316 5 Engineering Services During Bidding Phases $0
6 Engineering Services During Construction Phases $0
7 Project Management $24,625
Schedule 0 $0 $0 $0 $0
Project Management 10 20 10 40 $10,437 $0 $0 $10,437
Project Meetings 4 8 8 8 8 36 $8,245 $0 $0 $8,245
Additional QA/QC 20 20 $5,943 $0 $0 $5,943
TOTAL 20 67 203 138 40 335 212 487 20 4 81 60 382 2121 $443,124 $1,000 $131,575 $25,600 $51,000 $6,000 $18,538 $203,913 $647,037 November 29, 2023
196
Wastewater Treatment Plant Upgrade
Cloacina
March 12, 2024
197
Cloacina Agreement
• Competitive procurement
• Publicly advertised to MBR vendors
• Two proposers
• Following proposal and interview, City
selected Cloacina
198
Significant Terms - Cloacina
• Four packaged MBR facilities, each with an
average annual flow capacity of 0.5 MGD
• MBR will replace existing primary and
secondary treatment process
• Full redundancy, both process and
equipment
• Equipment and Process guarantee from
same Company
199
Payment Terms - Cloacina
• Upfront cost of $150,000
• Contract will be assigned to General
Contractor who wins WWTP Upgrade bid
• Total lump sum price: $30,933,973
• Construction progress payment schedule
• Price guaranteed through May 2025, and
escalation limited to CPI
200
Site Plan
201
Questions
202
Wastewater Treatment Plant Upgrade
HydroScience
March 12, 2024
203
HydroScience Amendment
• Amendment request of $647,037
• Covers additional elements proposed for
WWTP Upgrade not in original scope
• Also allows for updated billing rates
204
Existing WWTP
205
Proposed WWTP Upgrade
206
Proposed WWTP Upgrade
207
Proposed WWTP Upgrade
208
f
MEMORANDUM: March 8, 2024
AGENDA DATE: March 12, 2024
TO: Mayor and City Council
FROM: Paul Wood, City Manager
TITLE: A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF GREENFIELD TO SUPPLEMENTALLY
APPROPRIATE $227,900 FOR FY 2023-2024 FOR PUBLIC

WORKS EXPENDITURES
PURPOSE:

The purpose of this item is to make budget adjustments in the Public Works department that were either unexpected at the original budget adoption or that were subsequent requests by City staff or Council.

In most cities, at the midpoint of the fiscal year, the Finance Department reviews current spending to best forecast how the remainder of the fiscal year will look. Many times, this will include supplemental appropriations and revenue forecast adjustments. For us, this year is no exception.

BACKGROUND:

The Public Works Department staff has reviewed their funds and accounts and have determined that supplemental appropriations are needed for the below listed accounts. There are short explanations to the right of each amount.
100-320-65100 $6,000 Purchase next set of 38 downtown flags 100-550-64300 $30,000 Water Utility
100-550-65100 $1,200 completion of dog waste stations at remaining parks 503-335-64100 $58,000 electricity
503-333-64100 $3,000 electricity
City Council Memorandum 599 El Camino Real Greenfield CA 93937 831-674-5591 www.ci.greenfield.ca.us
209
100-111-65900 $4,000 building maintenance – Civic Center 100-320-65700 $1,000 streets supplies
100-550-65200 $1,500 uniforms
100-550-64100 $20,000 electricity
Total $227,900
A few of these items are for unforeseen additions (electricity is one where PG&E raised their rates during the year and we are having shortfalls in all departments for electricity. In this request, the additional appropriations total $81,000 for electricity. There are two items that further “mid-year” City Council requests (1) the downtown ECR banners, we are requesting to fund the purchase of the next 38 banners for Memorial Day, Veterans Day and 4th of July, as well as appropriations for the purchase of dog waste stations for the remainder of the parks that do not currently have them.

The “Water Utility” item is to pay ourselves for water usage at city parks and landscaping.

These appropriations will be funded by both the Water Fund and the General Fund.

COUNCIL ACTION
I MOVE TO APPROVE/DENY RESOLUTION #2024-22, A RESOLUTION OF THE

CITY COUNCIL OF THE CITY OF GREENFIELD TO SUPPLEMENTALLY APPROPRIATE $227,900 FOR FY 2023-2024 FOR PUBLIC WORKS EXPENDITURES AS OUTLINED IN THE STAFF REPORT.
210
RESOLUTION NO. 2024-22

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GREENFIELD TO SUPPLEMENTALLY APPROPRIATE $227,900 FOR FY 2023-2024 FOR PUBLIC

WORKS EXPENDITURES AS OUTLINED IN THE STAFF REPORT
WHEREAS, the purpose of this resolution is to make budget adjustments in the Public Works Department that were unexpected at the original budget adoption; and NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of Greenfield approves the supplemental appropriation for Public Works as follows:
100-320-65100 $6,000 Purchase next set of 38 downtown flags 100-550-64300 $30,000 Water utility
100-550-65100 $1,200 Completion of dog waste stations at remaining parks 503-335-64100 $58,000 Electricity
503-333-64100 $3,000 Electricity
100-111-65900 $4,000 Building maintenance – Civic Center 100-320-65700 $1,000 Streets supplies
100-550-65200 $1,500 Uniforms
100-550-64100 $20,000 Electricity
Total $227,900
PASSED AND ADOPTED by the City Council of the City of Greenfield at a public meeting of the City Council held on the 12th day of March 2024 by the following vote:

AYES, and all in favor, therefore, Councilmembers:

NOES, Councilmembers:

ABSENT, Councilmembers:

Robert White, Mayor
Attest:

Ann F. Rathbun, City Clerk
211

← All documents from this meeting