Cities Index.
Agenda packet

Hanford City Council
October 17, 2023

Document
Agenda packet
Meeting
October 17, 2023
Body
Hanford City Council
Pages
268
Original file
52.9 MB
Text extracted from the city's file for reading and search. Open the original on hanfordca.api.civicclerk.com. That file is the official record.

CESN45A7272"L x 4-1/2"W 1-1/2"H Aluminum Sill Nosing
Family Items!Details"Catalog#
Description:72"L x 4-1/2"W 1-1/2"H Aluminum Sill Nosing Specifications:$ Finish = Aluminum
$ Height = 1-1/2"
$ Length = 72"
$ Product Type = Sill Nosing
$ Width = 4-1/2"
CESN45A72SKU:
2023Catalog Year:
1310 (/catalogandflyers?doc=2023catalog&page=1310)Catalog Page:

Pacific Coast Aluminum ProductBrand:

Page 164 of 268 ends

8/17/23, 2:05 PMCharles McMurray Co. -

Page 1 of 1 ends

TL641ALHeavy Duty Grade 1 Barrier Free Aluminum Door Closer With Cover Family Items!Details"Catalog#
Description:Heavy Duty Grade 1 Barrier Free Aluminum Door Closer With Cover Specifications:$ Barrier Free = Barrier Free
$ Finish = Aluminum
$ Grade = Grade 1
$ Product Type = Door Closer
TL641ALSKU:
2023Catalog Year:
1270 (/catalogandflyers?doc=2023catalog&page=1270)Catalog Page:

Tell Mfg.Brand:

Page 165 of 268 ends

8/17/23, 1:45 PMCharles McMurray Co. -

Page 1 of 1 ends

KW780-15Satin Nickel Reversible Single Cylinder Smart Key Deadbolt Family Items!Details"Catalog#
Description:Satin Nickel Reversible Single Cylinder Smart Key Deadbolt Specifications:$ Finish = Satin Nickel
$ Function = Single Cylinder
$ Handing = Reversible
$ Key = Smart Key
$ Product Type = Deadbolt
KW780-15SKU:
2023Catalog Year:
1253 (/catalogandflyers?doc=2023catalog&page=1253)Catalog Page:

KwiksetBrand:

Page 166 of 268 ends

8/17/23, 1:39 PMCharles McMurray Co. -

Page 1 of 1 ends

TR1013-3-63016"L x 4"W Stainless Steel Pull Plate
Details!Catalog"
Description:16"L x 4"W Stainless Steel Pull Plate
Specifications:# Finish = Stainless Steel
# Length = 16"
# Product Type = Pull Plate
# Width = 4"
TR1013-3-630SKU:
2023Catalog Year:
1322 (/catalogandflyers?doc=2023catalog&page=1322)Catalog Page:

TrimcoBrand:

Page 167 of 268 ends

8/17/23, 1:46 PMCharles McMurray Co. -

Page 1 of 1 ends

TR1001-3-63016"L x 4"W Stainless Steel Push Plate
Details!Catalog"
Description:16"L x 4"W Stainless Steel Push Plate
Specifications:# Finish = Stainless Steel
# Length = 16"
# Product Type = Push Plate
# Width = 4"
TR1001-3-630SKU:
2023Catalog Year:
1322 (/catalogandflyers?doc=2023catalog&page=1322)Catalog Page:

TrimcoBrand:

Page 168 of 268 ends

8/17/23, 1:36 PMCharles McMurray Co. -

Page 1 of 1 ends

CET55A7272"L x 5"W x 1/2"H Aluminum Handicap Threshold
Family Items!Details"Catalog#
Description:72"L x 5"W x 1/2"H Aluminum Handicap Threshold Specifications:$ Application = Handicap
$ Finish = Aluminum
$ Height = 1/2"
$ Length = 72"
$ Product Type = Threshold
$ Width = 5"
CET55A72SKU:
2023Catalog Year:
1304 (/catalogandflyers?doc=2023catalog&page=1304)Catalog Page:

Pacific Coast Aluminum ProductBrand:

Page 169 of 268 ends

15.B.

AGENDA

STAFF REPORT

MEETING DATE: 10/17/2023 AGENDA SECTION: GENERAL BUSINESS

SUBJECT:

Authorization for the City Manager to execute a Utility Easement Agreement with Valley Strong Credit Union; and authorization to offer Grant of Easements for utility purposes to Southern California Edison across the city parking lot property (APN 012-022-011) located adjacent to Valley Strong Credit Union (216 W Eighth Street).

RECOMMENDATION:

That the City Council, by motion, regarding City parking lot, APN 012-022-011:

1. Authorize the City Manager to execute a Utility
Easement Agreement with Valley Strong Credit Union for the installation of utilities within City parking lot, APN 012-022-011;

2. Authorize the City Manager to sign a Grant of Easement from the City of Hanford to Southern California Edison across City parking lot, APN 012-022-011, for the installation of underground electrical services for the Valley Strong Credit Union project; BACKGROUND:

Valley Strong Credit Union is a new business being established in the downtown district. They are currently in the process of remodeling and making improvements to their building located at 216 W.

Eighth Street. Attached are Location Maps for reference.

As a requirement for property improvements, the owners, Valley Strong Credit Union, must provide separate electrical, sanitary sewer, and water services for the business.

The legal property line between Valley Strong Credit Union, APN 012-022-008 and the City public parking lot, APN 012-022-011, is located along the east wall of the existing building. The building wall is on the property line, and there are no setbacks to allow for utility services to access Valley Strong Credit Union without obtaining an off-site easement.

To accommodate the improvements, an easement across the city public parking lot adjacent to Valley Strong Credit Union is needed for the installation of separate utility services including sanitary sewer, water, and electrical services from Lacey Boulevard to the Valley Strong Credit Union building. Current utility services cross through a separate privately owned building to the north, and will be abandoned with the completion of the project. Attached for Council review is the Valley Strong Utility Plan which shows locations for utility installations under the sidewalk within the city parking lot.

Page 170 of 268 ends

The attached Utility Easement Agreement between Valley Strong Credit Union and the City of Hanford provides the conditions of the Grant of Easement. With Council approval, the City Manager would sign and execute the agreement. With the recording of the document, a Grant of Easement is provided to Valley Strong Credit Union for utility purposes.

Additionally, a Grant of Easement from the City of Hanford to Southern California Edison Company has been prepared and is attached for Council review. The easement includes a strip 7’ wide and 80’ long across the City parking lot, APN 012-022-011, that would be used for the installation of an underground electrical service to the Valley Strong CU building.

Valley Strong Credit Union has committed to making the necessary improvements on the west side of the city parking lot to install utility services, which include reconstructing the sidewalk, planters, and restriping parking stalls between Lacey Boulevard and Eighth Street.

FISCAL IMPACT:

There is no fiscal impact with this project. The costs of utility installation and improvements will be borne by the Grantee, Valley Strong Credit Union.

ATTACHMENTS:

1. 1. Location Maps

2. 2. VALLEY STRONG - UTILITY PLAN

3. 3. Utility Easement Agreement

4. 4. GRANT DEED - CITY TO SCE UNSIGNED

Page 171 of 268 ends

Location Map
Valley Strong Credit Union
216 W. Eighth Street
Legend
216 W 8th St
400 ft
N➤➤
N

Page 172 of 268 ends

Project Site
Valley Strong Credit Union and City Public Parking Lot
100 ft
N➤➤
N

Page 173 of 268 ends

™IS MAP IS FOR ASSESSMENT PURPOSES ONLY
IT JS NOT TO 'BE CONSTRUED AS PORlRA"l'lNC
LEGAL O'\'fNERSHIP OF DMSIONS or LAND FOR
PURPOSCS OF ZONING OR SUBDIVISION LAW.

DECEMBER 200-4
Copyrlg:nt O 1997, Kings Col;nty Asscs!K>r's Office
All rights reserved
0 ....

KINGS COUNTY ASSESSOR'S
·®K
10 LACEY BL\otl. 2-148
i.

BO
®
MAP 12-02
r
1" t 100'
1 "
f-----j

Page 174 of 268 ends

DRAFT

Page 175 of 268 ends
Page 176 of 268 ends
Page 177 of 268 ends
Page 178 of 268 ends
Page 179 of 268 ends
Page 180 of 268 ends
Page 181 of 268 ends
Page 182 of 268 ends
Page 183 of 268 ends
Page 184 of 268 ends
Page 185 of 268 ends
Page 186 of 268 ends
Page 187 of 268 ends

EXHIBIT "C"

Page 188 of 268 ends

EXHIBIT "C"

Page 189 of 268 ends

EXHIBIT "C"

Page 190 of 268 ends

EXHIBIT "C"

Page 191 of 268 ends
Page 192 of 268 ends
Page 193 of 268 ends
Page 194 of 268 ends
Page 195 of 268 ends
Page 196 of 268 ends
Page 197 of 268 ends
Page 198 of 268 ends
Page 199 of 268 ends
Page 200 of 268 ends
Page 201 of 268 ends

6FKXHW]5RDG
6W/RXLV02
7HOHSKRQH









)D[





&(57,),&$7(2),1685$1&($1'&(57,),&$7(2),1685('0(0%(5 7+,6&(57,),&$7(,6,668('$6$0$77(52),1)250$7,2121/<$1'&21)(56125,*+768321 7+(&(57,),&$7(+2/'(57+,6&(57,),&$7('2(6127$0(1'(;7(1'25$/7(57+( &29(5$*($))25'('%<7+(32/,&</,67('%(/2:
$7+(&(57,),&$7(+2/'(5
1DPH

$GGUHVV

%&(57,),&$7(2),1685$1&(

7KLVLVWRFHUWLI\WKDWWKHSROLF\RILQVXUDQFHOLVWHGEHORZKDVEHHQLVVXHGWRWKHLQVXUHGDVVRFLDWLRQWUXVWRUIXQG QDPHGEHORZDQGLVLQIRUFHDWWKLVWLPH1RWZLWKVWDQGLQJDQ\UHTXLUHPHQWWHUPRUFRQGLWLRQRIDQ\FRQWUDFWRU RWKHUGRFXPHQWZLWKUHVSHFWWRZKLFKWKLVFHUWLILFDWHPD\EHLVVXHGRUPD\SHUWDLQWKHLQVXUDQFHDIIRUGHGE\WKH SROLF\GHVFULEHGKHUHLQLVVXEMHFWWRDOOWKHWHUPVH[FOXVLRQVDQGFRQGLWLRQVRIVXFKSROLF\6KRXOGDQ\RIWKH SROLF\GHVFULEHGKHUHLQEHFDQFHOHGEHIRUHH[SLUDWLRQGDWHWKHUHRIWKH&25325$7,21ZLOOHQGHDYRUWRPDLO VL[W\

GD\VZULWWHQQRWLFHWRWKHDERYHQDPHGFHUWLILFDWHKROGHUEXWIDLOXUHWRPDLOVXFKQRWLFHVKDOOLPSRVHQR REOLJDWLRQRUOLDELOLW\RIDQ\NLQGXSRQWKH&25325$7,21 6$)(7<1$7,21$/&$68$/7<&25325$7,21
%\
*XV($LYDOLRWLV
&KLHI8QGHUZULWLQJ2IILFHU
'DWH
)HEUXDU\
,1685('$662&,$7,2175867
25)81'

&5(',781,216(/),1685('*52832)&$/,)251,$,1&
32/,&<180%(5
63
7<3(2),1685$1&(
6SHFLILF([FHVV:RUNHUV¶&RPSHQVD WLRQDQG(PSOR\HUV¶/LDELOLW\,QVXUDQFH /2&$7,21
6 &$/,)251,$
32/,&</,$%,/,7<3(5,2'
-DQXDU\WKURXJK-D QXDU\
32/,&<3$<52//5(3257,1*
3(5,2'
-DQXDU\WKURXJK-DQXDU\
6HOI,QVXUHG5HWHQWLRQ3HU2FFXUUHQFH 
0D[LPXP/LPLWRI,QGHPQLW\3HU2FFXUUHQFH 6WDWXWRU\
(PSOR\HUV¶/LDELOLW\0D[LPXP/LPLWRI,QGHPQLW\3HU2FFXUUHQFH  &&(57,),&$7(2),1685('0(0%(5

)XUWKHUWKLVLVWRFHUWLI\WKDWWKHLQVXUHGPHPEHUQDPHGEHORZLVDPHPEHURIWKHLQVXUHGDVVRFLDWLRQWUXVWRU IXQGDQGDVVXFKPD\GHULYHEHQHILWIURPWKHLQVXUDQFHSROLF\OLVWHGDERYHWRWKHH[WHQWGHWHUPLQHGE\WKH LQVXUHGDVVRFLDWLRQWUXVWRUIXQG
,QVXUHG0HPEHU
1DPH

$GGUHVV

(IIHFWLYH'DWH


City of Hanford
900 S. Douty, Hanford, CA 93230
Valley Strong Credit Union
216 W 8th St., Hanford, CA 93230

Page 202 of 268 ends

RECORDING REQUESTED BY

WHEN RE CORDED MAIL T O

SOUTHERN CALIFORNIA EDISON COMPANY
2 INNOVATI ON W AY, 2 nd FLOOR
POMONA, CA 91768

Attn: Title and Real Estate Services

SPACE ABOVE THIS LINE FOR RECORDER’S USE
SCE Doc. No.

GRANT OF

EASEMENT
DOCUMENTARY TRANSFER TAX $ NONE
VALUE AND CONSIDERATION LESS THAN $100.00)

DISTRICT
San Joaquin Valley

SERVICE ORDER
TD2096376
SERIAL NO.

MAP SIZE

_____________________ SCE Company
SIG. OF DECLARANT OR AGENT DETERMINING TAX FIRM NAME GV M KA -6223 -C4
APN 012-022-011

APPROVED:

VEGETATION &
LAND

MANAGEMENT
BY
SLS/DN
DATE
09/19/2023

CITY OF HANFORD, a Municipal Corporation (hereinafter referred to as “Grantor”), hereby grants to SOUTHERN CALIFORNIA EDISON COMPANY, a corporation, its successors and assigns (h ereinafter referred to as “Grantee”), an easement and right of way to construct, use, maint ain, operate, alter, add to, r epair, replace, reconstruct, inspect and remove at any time and from time to t ime und erground electrical supply systems and communicati on syste ms (hereinafter refer red to as “systems”), consisting of wires, underground conduit s, cables, vaults, manholes, handholes, and including above-ground enclosures, markers and concrete pads and other appurtenant fixtures and equipment necessary or us eful for distributing electri cal energy and f or transmitting intelligence, data and/or comm unications (eg. through fiber optic ca ble), in, on, over, under, across and along that certain real property in the County of Kings, State of California, described as follows:

THE NORTHERLY 80.00 FEET OF THE WESTERLY 7.00 FEET OF LOT 10, IN BLOCK 154, MAP OF THE TOWN OF HANFORD, IN THE COUNTY OF KINGS, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 1 AT PAGE 35 OF MAPS, TULARE COUNTY RECORDS.

It is understood and agreed that the above description is approximate only, it being the intention of the Grantor(s) to grant an easement for said syst ems as constructed. The centerline of th e easement shall be coincidental with the centerline of said systems as constructed in, on, over, under, across, and along the Grantor(s) property.

This legal description was prepared pursuant to Sec. 8730(c) of the Business & Professions Code.

Grantor further grants, bargains, sells and conveys unto the Grantee t he right of assignment, in whole or in part, to others, without limitation, and the right to apportion or divide in whatever manner Grantee deems desirable, any one or more, or all, of the easements and rights, including but not limited to all rights of access and ingress and egress granted to the Grantee by this Grant of Easement.

Grantor agrees for himself, his heirs and assigns, not to erect, place or maintain, nor to permit the erection, placement or maintenance of any building, planter boxes, earth fill or other structures e xcept walls and fences on the above described real property. The Grantee, and its contractors, agents and employees, shall have the right to trim or cut tree roots as may endanger or interfere with said sys tems and shall have fre e access to said systems and every part t hereof, at al l times, for the purpose of exercising the rights herein granted; provided, however, that in making any excavation on said property of the Grantor, the Grantee shall make the same in such a manner as will cause the least injury to the surface of the ground around such excavation, and shall replace the earth so removed by it and re store the surfa ce of the ground to as near th e same con dition as it was pr ior to s uch excavation as is practicable.

Page 203 of 268 ends

2 DSE_____________________
TD2096376

EXECUTED this _____ day of _______________________, 20____.

GRANTOR

CITY OF HANFORD,
a Municipal Corporation

____________________________________
Signature

____________________________________
Print Name

____________________________________
Title

A Notary Public or other offi cer completing this certificate verifies only th e identity of the individual who signed the d ocument to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )

County of )

On _______________________ before me, , a Notary Public, personally appeared

, who proved to me on the basis of
satisfactory evidence to be th e person(s) whose name(s) is/are subscribed to t he within instrument and acknowledged to me t hat he/she/they executed the same in his/her/their authorized capacity(ies ), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature _______________________________ (Seal)

Page 204 of 268 ends

3 DSE_____________________
TD2096376

EXECUTED this _____ day of _______________________, 20____.

GRANTEE

SOUTHERN CALIFORNIA EDISON COMPANY,
a corporation

____________________________________
Signature

____________________________________
Print Name

____________________________________
Title

A Notary Public or other offic er completing this certificate verifies only the i dentity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )

County of )

On _______________________ before me, , a Notary Public, personally

appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/t heir authorize d capacity(ies), and th at by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature _______________________________ (Seal)

Page 205 of 268 ends

15.C.

AGENDA

STAFF REPORT

MEETING DATE: 10/17/2023 AGENDA SECTION: GENERAL BUSINESS

SUBJECT:

Award of a contract with Melton Design Group for the professional architectural and engineering design services for Heroes Park, in the amount of $1,044,840, and authorization for the City Manager to execute the professional services agreement.

RECOMMENDATION:

Recommendation: That the City Council, by motion, Award a contract to Melton Design Group for the professional architectural and engineering design services for Heroes Park in the amount of $1,044,840 and authorize the City Manager to execute the professional services agreement BACKGROUND:

On September 19, 2021, the City of Hanford was awarded $8.5 Million for the Statewide Park and Development Community Revitalization Program, funded by Proposition 68 from the California State Department of Parks and Recreation for the acquisition and development of Heroes Park. Following a lengthy land acquisition process, the City closed escrow on a 40-acre parcel on June 15, 2023, located on Grangeville Blvd and the future 9th Avenue.

The City released a Request for Proposals (RFP) through the online procurement system, BidNet (see attached RFP). The RFP remained open for eight weeks. Six written proposals were submitted from the following design firms:
• Klassen Corporation
• Hargrove and Associates
• Melton Design Group
• SAFEbuilt
• RRM Design Group
• O'Dell Engineering

Proposal Evaluation Criteria

The proposal evaluation criteria consisted of a two-stage process. The first evaluation consisted in the rating of the written proposals, with the second step being an oral interview. The rating categories and maximum points are detailed in the table below and included within the RFP:

Page 206 of 268 ends

A five-person proposal review panel consisting of three City staff, a third-party Engineer, and a Parks and Recreation Director from a neighboring city scored and ranked the written proposals.

The top three design firms were invited to present their proposals and answer interview questions in person or remotely via Zoom. Twenty minutes were allocated for their presentation and forty minutes for questions. The scoring and ranking of proposals are detailed in the table below:

Based on the scoring totals, the Melton Design Group (MDG) was selected as the firm best-qualified and best-suited to design Heroes Park.

MDG is a Chico-based firm formed by Greg Melton 13 years ago. They currently employ 17 design and office staff, specializing in landscape architecture. Their team consists of a group of sub- consultants and vendors with experience within the region and are experienced at creating one-of-a- kind destination parks.

Melton Design Group Sub-Consultants

Page 207 of 268 ends

• Urban Tree Foundation - Based in Visalia with 20+ years of experience in landscape architecture and urban forestry.
• 4 Creeks, Inc. - Located in Hanford with extensive experience in Civil and traffic engineering and land surveying.
• Spohn Ranch - Professional skate park designers and builders • Chris Slater Consulting - Mechanical and electrical engineering • Streamline Engineering - Structural engineering

Vendors
• Cedar Forest Products - Manufacturer of pre-fabricated concrete, wood, and steel shelters. • Hunter Industries - Landscape irrigation and outdoor lighting manufacturer • Landscape Structures - Commercial playground equipment manufacturer • Rainforest Art Project - Custom glass and mosaic art installation • Musco Lighting - Professional sports lighting company specializing in sports, transportation, and infrastructure lighting.

For a detailed description of MDG's scope of work, project schedule, and statement of qualifications, please see their attached written proposal.

FISCAL IMPACT:

The funding for the design services for Heroes Park was appropriated by the Council in May 2022 in the amount of $10,291,208, which includes $8.5 Million from the Proposition 68 grant award and $1,791,208 from the Park Impact Fee Fund.

ATTACHMENTS:

1. MDG Proposal for Heroes Park Design 6.30.23

2. Hanford_Melton Professional Services Agreement_Signed MDG

3. 2023-09-13 - MDG-Hanford_Heroes Park Agreement

Page 208 of 268 ends

T O : C i t y o f H a n f o r d
D
U
E

D
A
T
E
:

J
u
n
e

3 0
,

2 0
2 3
P r o p o s a l F o r :

M E L T O N D E S I G N G R O U P , I n c .

L A N D S C A P E A R C H I T E C T S & P L A N N E R S C
H
I
C
O

|

S
A
C
R
A
M
E
N
T
O
M
E
L
T
O
N
D
G
.

C
O
M

(
5 3
0 )

8 9
9 -
1 6
1 6

Page 209 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
Table of Contents

1. COVER LETTER
 Who We Are

2. PROJECT UNDERSTANDING and APPROACH

3. SCOPE OF WORK

4. PROJECT SCHEDULE

5. PROJECT CUTSHEETS

6. TEAM ORGANIZATIONAL CHART

7. RESUMES

8. STATEMENT OF QUALIFICATIONS
 Our Past Supports Your Future

9. CONFLICT OF INTEREST STATEMENT

10. REFERENCES

11. APPENDIX: REQUIRED FORMS

COST PROPOSAL (submitted separately)

Page 210 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
June 30, 2023

Attn:  City of Hanford,
Parks and Community Services Department
c/o Brad Albert, Parks and Community Services
Director
321 N. Douty Street, Suite B
Hanford, CA  93230

Re:   Architectural Design Services:

Heroes Park, Proposal No. 2023‐14

For your consideration,

Melton Design Group, Inc. (MDG) is excited for the opportunity to work with you to provide Professional Landscape
Architect  Services  for  your  community.   We  are  a  team  of  exceptional  professionals  specializing  in  landscape architecture, park design, irrigation design and recreation planning.  Parks are our PASSION; we have designed over 100 parks in California!

For your project, we have gathered sub‐consultants
and product vendors that have experience in your community and are experienced in creating a one‐of‐a‐kind destination park.  The following proposal outlines how we plan on taking your beautiful plot of farmland and developing it into a thriving destination recreation space that will be a huge attraction and destination in the region.

We believe in the following:


WE  CARE.   Every  project  is  a  passion  project.   We  seek  out  partners  who  care  deeply  about  their communities.
 WE LISTEN.  Every project begins by getting to know the stakeholders as well as we can.  We work closely with you to develop clarity and consensus among the diverse users and decision‐makers.  WE ADAPT.  We see design as the intersection of people, purpose and place.  Every project is tailored to its unique conditions.   Our hope is to help you shape something that feels perfectly tuned to its settings and circumstances.

This proposal highlights our ability to perform the necessary tasks and services to achieve all your objectives.  We believe that our experience in both the public and private sectors will make Team MDG a great asset to you, your project and your community.

Sincerely,

Gregory Melton ‐ RLA 4217
(530) 899‐1616 / [email protected]
Custom Egret Play Structure at Da' Yas Park, Eureka, CA

Page 211 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
Who We Are

COMPANY PROFILE

Melton Design Group, Inc. (MDG) is a Chico‐based firm formed by Greg Melton 13  years  ago  and  is  now  the  premier  design  firm  in  Northern  California.   The Design Group staff has worked closely with communities throughout Northern California over the past 35 years and continues the tradition of providing Clients with  the  highest  quality  of  licensed  landscape  architectural  services.   We currently have a design and office staff of 17 dedicated individuals ready to apply their skills to your project.

WHY WE ARE QUALIFIED

We  are  qualified  for  your  project  because  the  MDG  Team  has  worked together successfully on  projects; we  complement  each other and bring many  years  of  experience  working  as  a  team.   We  have  a  clear understanding of your needs and how to turn your park into an attractive, functional,  low‐maintenance  park  that  serves  your  community.   We  are committed to pushing the design envelope, so your park is the best, most used and remembered for years to come.   The MDG Team will complete and finalize your design within budget.  We create precise plans, specs and bid documents to successfully award to a  contractor and we administer the  construction  of  your  project,  providing  full  project  management services.

We can handle your project from start to finish!

Butte County Administration Center 2018 ASCE
Outstanding Urban or Land Development Plan of the Year
Chico City Plaza
2009 CRA Excellence in Public Spaces

FEATURED AWARDS

MDG has been recognized by public and professional agencies for a wide range of projects and community outreach.

2021 California Parks and Recreation Society (CPRS)
Design Excellence Park Planning

2018 American Society of Civil Engineers Sacramento Chapter Outstanding Urban or Land Development Plan of the Year

2014 American Society of Landscape Architects
Sierra Chapter Honor and Merit Awards
Parks/Open Space and Rehabilitation/Mitigation

2009 California Redevelopment Association
Award of
Excellence in Public Spaces

2007, 2008 and 2009 American Society of Irrigation Consultants National Excellence in Irrigation Honor Award

2007 Chico Economic Planning Corporation

Community Vitality Award

2005 California Parks & Recreation Society
Award for Facility Design and Park Planning

WE EXCEL AT…
 Visioning & Communication
 Unique, Locally Focused Design
 Community Outreach
 Stakeholder Understanding
 Operation & Maintenance
 Full Designs & Plan Check Review
 Sustainable Design Techniques
 Design Guidelines & Standards
 Construction Plans & Details

Page 212 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
Verbena Fields Habitat Restoration
2009 ASIC National Excellence in Irrigation
2014 ASLA Open Space and Rehabilitation
MDG brings a consortium of thinkers and makers to serve you.  The TEAM integrates the minds that take design, development,  operations  and  maintenance  to  new  levels.   Our  experts  are  committed  to  quality  and  efficient services with the support of our professional staff members to complete our consultant team.  The following is a list of services provided by MDG and our subconsultant team.

SERVICES PROVIDED BY MDG

Melton Design Group provides client services throughout the life of a project, and we are proficient in developing clean sets of documents that are easy to permit and build.  Shown here is the list of services we provide in addition to  the  complete  project  management  and  direct  communication  between  all  consultants,  Client  Staff  and Stakeholders.   MDG  uses  both  direct  person‐to‐person  meetings  for  primary,  critical  design  sessions  and presentations and virtual communication for coordination and file sharing.   Other services include, but are not limited to:

SERVICES PROVIDED BY MDG’S POOL OF SUB‐CONSULTANTS

In addition to the primary management and landscape architect services, the TEAM provides the following services depending on the project scope of work.  We work together to engage the community, to work with agencies and to create a complete project.  Sub‐consultant services include:
 Surveying, Civil Engineering, Geotechnical Services
 Electrical Engineering
 Structural Engineering
 Architectural Design Services
 Wayfinding and Interpretive Design

 Site Analysis and Understanding
 Facilitation of Public Workshops
 Site Master Planning and Visioning
 Project Branding and Park Identity
 Research and Investigation
 Photo Simulations
 Interpretive Design and Signage
 CEQA / EIR Coordination
 Cost Estimates and Analyses
 Public Agency Presentations
 Construction Drawings, Details and Specification
 Contract Documents and Bid Documents
 Storm Water Pollution Prevention Plans
 3D Modeling and Animation
 Construction Observation and Administration
 LEED and SITES Certification
 Construction Standards and Building Codes
 Maintenance Manuals and Guidelines
River patterns of concrete represent local rivers and lead to a benchmark location on a glass aggregate globe pattern at the central park fountain.

Page 213 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811- 916.594.9342
MELTONDG.COM
We Can Handle Your Project
PROJECT UNDERSTANDING and APPROACH

The following approach and vision will address how Melton Design Group and our Team of Engineers will serve you and complete your project above expectation!

Our design approach and process will develop a park that creates identity for the community and neighborhood.  We create multi‐use, multi‐age and multi‐ ability  facilities  to  be  enjoyed  by  all.   The  MDG  Team  provides  you  with  a qualified group of Landscape Architects, Engineers and Design Professionals.

To  develop  your  project,  we  will  use  our  years  of  experience  and understanding  of  the  design  process.   We  will  work  with  your  Staff, Stakeholders and Community following the program and guidelines created for the project during initial coordination and engagement.

CONCEPTUAL IDEAS and OPPORTUNITIES

As a part of our proposal process and our excitement to design your project, we want to provide you with some of our unique design ideas.   Our goal at the start of any project is to encourage brainstorming, questions and conversations.  Our hope is that these early suggestions spark the imagination about the range of possibilities your site  offers.   We  look  forward  to  working  closely  with  you,  the  community  and  the  stakeholders  so  we  can understand the project in even more depth to create a place that is both cost ‐effective and inspiring.  The below sketch on the following page identifies design opportunities and proposed locations.

Popular Slides at a San Francisco Park

Page 214 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811- 916.594.9342
MELTONDG.COM
PRIMARY ELEMENTS FOR HEROES PARK

1. OUTDOOR AMPHITHEATER – This proposed amphitheater will be designed to house 3,000 – 5,000 people in the audience and have two digital panels on each side of the stage allowing for clear views from all angles.
 Terraced  bench  seating  and  mounded  grass  hills  with picnic tables provide an elevated view of the amphitheater stage.
 The grass hills will be built with on‐grade slides leading to the play area for climbing and sliding.
 Two pre‐fabricated restroom facilities will be located near the amphitheater for easy use.

2. DESTINATION PLAYGROUNDS FOR ALL AGES – When creating destination playgrounds, we focus on creating
designs with relevant local themes.   In this case, the park and the play areas will honor and celebrate the heroes of the Hanford community.  We will meet with the community to identify this theme, then fine tune the design to be meaningful, fun and memorable.
 The playgrounds will include many elements of play, including slides, climbing structures, swings, rope courses and natural play.  Our goal is to make all elements of this park accessible for everyone of all ages and abilities.
 Lead  times  on  materials  and  equipment  are  long.   A  pre‐purchase  agreement  with  vendors  through Sourcewell,  or  other  third‐party  purchasing  groups,  can  allow  us  to  save  on  product  cost  while  also ensuring timely delivery.

3. TOURNAMENT‐READY PICKLEBALL COMPLEX – We’ve designed a pickleball complex for daily recreation and tournament use.  Included are 16 full‐size lighted pickleball courts, along with multiple bleachers and benches for spectators to watch and cheer on the players.

4. ALL‐WHEEL SKATE PARK – We want to make sure this new skate park is inclusive to people of all abilities, so we’ve designed it to be accessible for skateboard, scooter, rollerblade and wheelchair users.  The design will
be 70% street and 30% bowl, including multiple obstacles and an adjacent parking lot for accessible parking.

5. DISC GOLF COURSE – Around the perimeter of the park, we’ve proposed adding an 18‐hole disc golf course.

The course will take you from the park arrival gateways, around the multi‐use natural turf fields and will end near the pickleball complex.

6. PICNIC and SHADE AREAS – There will be shaded picnic areas throughout the park, including the elevated terraces  above  the  play  and  amphitheater  and  on  the  flatter  parts  of  the  site.   These  structures  can  be prefabricated  to  provide  a  more  cost‐effective  installation  process.   These  structures  will  have  consistent theming with the rest of the park and will cover the key play areas until the trees mature.

7. FOOD CONCESSIONS IN GAME AREA – Providing food concessions adjacent to the game area will play a main role in attracting users to the tournament and event facilities, while bringing income to the park.  This social space will allow private operators to rent the restaurant/concession spaces.  Concrete game elements like cornhole and ping‐pong will provide additional entertainment.  Provide event rooms like banquet or reception rooms that have catering kitchen and space for medium to large groups that can be VIP for large concerts or used for weddings or parties.

Grand opening of 4,000 person amphitheater
Anderson River Park, June 2023

Page 215 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811- 916.594.9342
MELTONDG.COM

8. FUTURE  RECREATION  CLUBHOUSE  and  EVENT  ROOMS  –  If  funded, recreation  rooms  can  be  constructed  for  community  classes  and  local events.  can be added to the construction design process as an additional service.

9. PUBLIC ART: BRANDING and MAKING A STATEMENT – After being at the site and seeing your tank
at the cemetery and knowing that Grangeville is
going to be a major connector into town, it makes sense to do something impactful at the arrival corner of the park.

10. MAINTENANCE and OPERATION / 30‐YEAR LIFE‐CYCLE COST ANALYSIS – As a part of the design scope, we are always pushing to build a durable and maintenance‐friendly park.   We will be designing your park with long‐term maintenance in mind and preparing your capital budget for long‐term funding of that maintenance.  Provide  a  30‐year  capital  budget  spreadsheet  anticipating  future  costs  that  will  support  your  annual budget allocations for park maintenance and replacement.

11. URBAN FORESTS, GHG REDUCTION, WELLNESS TRAILS – This park will receive hundreds of new trees and shrubs to bring shade to new trails and a sense of nature  and  beauty  to  the  park,  especially  along  the  trail.   Evergreens  will dominate the urban forest with large deciduous trees creating shade for the trails and for CO2 sequestration.  Our open spaces and trees are some of the most important elements to increase our mental health and wellbeing.

Heroes Art Example to accent corner
and brand the park at Grangeville blvd.

Page 216 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
The Path to Success

SCOPE OF WORK

The  following  is  a  refined  list  of  what  has  been  described  in  your  proposal along  with  additional  key  elements  that  we  could  add  to  your  project  to enhance functionality and the overall appeal of the park.

This scope will guide us through this process in creating a special park.

Phase 1 – Primary Elements per the Grant and Outreach efforts performed by the City.
 Destination playground that attracts users of all ages and abilities  A 16‐court tournament‐ready, lighted pickleball complex with spectator area

 A 3,000‐5,000‐capacity regional amphitheater
 A 1‐mile‐long perimeter‐lighted multi‐use path looping the complex  Fitness stations
 One lighted all‐wheel skate park that accommodates skateboards, bikes and scooters, primarily focusing on street skating with some bowl features.
 One dog park that is linked to the central part of the park  Reflexology and meditation trail
 One community/learning garden adjacent to Fire Station  One 18‐hole disc golf course within the park open space  Two outdoor basketball and volleyball courts that may support futsal or 5‐a‐side soccer.

Supporting Elements for the Project:
 Parking area to support small and large events
 Two park restrooms with storage for maintenance crews  Public art installation visible to the community and representing the“Heroes” theme
 ROW and sizing enhancements to Grangeville Boulevard to support the future expansion, connection to the High‐Speed Train Station and future mass transit and bike circulation  Street parking, sidewalks, street widening and street lighting on three public streets  Water and sewer extensions and connections

Phase 2 – Elements that will be a Master Planned but most likely not a part of Phase 1  Multi‐use fields/open space elements on the south end of the site as potential cost cutting area  Recreation Building for indoor events and receptions
 Concessioned Food and Beverage buildings to support tournaments and special events

The following is an outline of our proposed Scope of Work to take your project from start to finish:

TASK 1 – PROJECT MANAGEMENT and PARK PROGRAM REFINEMENT The project launch sets the tone for a successful project.  The prime consultant brings the key players from each consultant and meets with the Client’s project manager and assisting staff.  We intend to meet with the City two weeks after award to describe our approach in detail and then continue with monthly or bi‐monthly meetings throughout the project depending upon urgency.

Playful Outdoor Music and Shade Poppies
at Riverbend Park, Oroville, CA
On‐grade Slide

Page 217 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM

1.1 Meet with the Client and Team to discuss the scope of work, design needs and specific desires for the project.  Identify a key group of stakeholders to form a Project Development Team (PDT).

1.2 Create project design schedule and update throughout project for all design tasks.

1.3 Coordinate project and perform monthly meetings to assess project progress and enhance the Quality Assurance and Quality Control throughout project.

1.4 Engage with Client Staff to refine grant program to meet budget and to assess and prioritize the needs of the community within the budget.  Engage other options for funding regarding the project.

1.5 Develop enhanced program of elements and prioritize Client’s desires.  Review ideas and gain a complete understanding of the project.  Discuss all possible opportunities and study constraints directing the design.

Deliverables:
o Monthly Reports / Updated Schedule for the PDT
o Invoices at milestones for percent of completion
o Prioritized program identifying key elements within budget to identify phasing options

TASK 2 – SITE ANALYSIS, MASTER PLAN, COST DEVELOPMENT and PUBLIC OUTREACH Team MDG works with the Client, and, if needed and time allows, the Community through Outreach Events, in a collaborative  process  to  first  identify  their  needs  and  wants.   We  then  create  a  prioritized  program  that  best represents these.   This phase includes multiple alternative layouts and elements to provide an engaging design process.

2.1 Refine the Park Program from City Staff and ongoing community and costs input.  We will provide outreach for specific elements of the park such as the Skate Park Element.  Research other playgrounds to avoid duplicating what’s already around.

2.2 Site Visit and Analysis – Analyze site and surrounding area to confirm existing conditions.  Study all site elements using aerial view and site visit.  Study general grades to understand the elevation challenges.  Conduct research to confirm utilities and drainage on plans and onsite. (performed by 4Creeks)  MDG and 4Creeks will coordinate directly with the utility companies to gain information.  Identify all onsite elements that are to remain and to be removed.  Obtain all site conditions from sun, wind, views, neighbors, uses, etc.

2.3 Topographic Survey of key site areas.
 Conduct a topographic field survey, 1’ contour intervals. (performed by 4Creeks)  Identify all onsite elements that are to remain or to be removed.  Provide spot elevations.

2.4 Base Map – Use topography, aerial photos and site surveys to develop the Base Map.

2.5 Master Plan and Cost Estimate – Include design and cost alternatives and meet with Staff to review.  MDG will provide the Team with all horizontal control designs for review and adjustments.  Incorporate all elements of proposed program into plan view schematic plan with descriptions and dimensions of all elements.
 Provide alternative options for key areas that warrant study and/or give a new look.  Develop digital and hand‐drawn 3D rendering of sites.  Client review of key sites with VR.  Develop Cost Estimate.  Breakout costs so alternatives can be swapped in for value engineering.

2.6 Community Engagement Workshop Meetings – The
City has performed outreach during the grant phase
of  the  project.   MDG  proposes  to  take  that  to  the next  level  by  providing  meetings  for  specific
elements  such  as  the  Skate  Park  and  Destination
Playground.

DELVE DEEPER WITH OUTREACH
Special parks reflect their community.  A deeper dive
into  element  details,  like  the  skate  park  and
destination play area, fuel unique designs.

Page 218 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
 Outreach  Meeting  #1  –  Present  overall
concept  plan  options  with  site  layouts  and
proposed elements to community.  Confirm
the relationships of each element.
 Outreach  Meeting  #2  –  Present  specific
details of proposed elements, focusing on an
all‐wheel skate park and the destination playground.
 Review initial public feedback and revise plans as needed.  Outreach  Meeting  #3  –  Present  revised  Master  Plan  based  on  outreach  to  the  community  to obtain any final community input.

2.7 Revise and update alternatives and present them to the City.  Meet  with  Client  and  Team  to  review  design  for  conformance  and  make  recommendations regarding engineering, LID, utilities, drainage, etc.
 Update sketches and 3D throughout Master Plan process.

2.8 Develop Preferred Alternative and Cost and present to PDT.  Assess design and phasing options and reassess prioritized elements.  Client to provide additional direction and comment.

2.9 Revise Final Schematic Master Plan Design and Cost to present and gain approval from the City.  Value engineer project while maintaining the character of the project.  Update final graphics for 3D, virtual reality flybys and plan view color.

2.10 Create a Master Plan booklet that summarizes the design process.

Deliverables:
o Prioritized Program for Public Outreach
o Schematic Designs with alternatives
o Final 11 x 17” Master Plan booklet (5 copies)
o Preliminary / Final Costs Estimate
o In‐Person and Virtual Meetings as needed.
o Final Cost Analysis

TASK 3 – PLANS, SPECIFICATIONS and ESTIMATES:  Refining Design We will conduct more detailed studies of the preferred design incorporating all disciplines (civil, structural and electrical), altering the concepts using different best practices, models, details and methods, to evaluate and value engineer the project while performing QA/QC throughout the process.  We will also complete multiple phases of submittals for review at 50%, 75%, 90% and 100% of completion.

3.1 Develop a digitized final site and landscape Master Plan and 3D rendering.

3.2 Present final plan to the City and gain approval to move on to 75%, 90%, 100% Construction Drawings.

3.3 DEMOLITION PLAN – Show location of all elements that require removal and offsite disposal.

3.4 GRADING PLAN – Show location and layout of all proposed grading, drainage and utilities.  Identify areas requiring imported soil for better drainage and plant health.  Show new drainage patterns with slopes and compaction.  Identify all landscape mounds and earth shapes.

3.5 ELECTRICAL,  LIGHTING  and  SOLAR  LIGHTING  PLAN  –  Lighting  location  and  fixture  type.   Coordinate  all electrical fixtures and play and security lighting in landscape with Electrical Engineer.

3.6 STRUCTURAL DETAILS and CALCULATIONS – Necessary  structural  calculations  for  footings  for  walls  and entry monumentation.

3.7 CONSTRUCTION/LAYOUT PLAN – Show location of all proposed hardscape, play areas and lighting.  Identify all paving locations, types, finish and detail reference.  Locate all existing conditions to remain including utilities.

MDG  loves  to  show  up  at  a  public  event  like  a Brewfest or parade and POP‐UP a tent, layout all the
plans and gain spontaneous input from the public.

HOW TO BEST GET INPUT ON DESIGN!

Page 219 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
 Identify all material types and installation details.

3.8 ARCHITECTURAL VISION and ELEVATIONS FOR STRUCTURES
 Provide review of design for restrooms, amphitheater bandstand and any additional items like sign structure or other modifications.
 Coordinate with prefabricated structures to ensure timely delivery.

3.9 IRRIGATION  PLAN  –  Irrigation  plan  with  complete  water  use  information  including  all  water  use calculations for all planting areas.
 Identify all irrigation water use zones (trees, shrubs and ground cover) along with mainline, new and existing valves, point of connection and meters.
 Show legends and identify all elements of irrigation.

WATER USE CALCULATIONS, SCHEDULING and GUIDELINES
 Provide water use calculations identifying maximum applied water allowance and water use.  Develop water use schedule with seasonal adjustments along with estimated water use calcs.

3.10 PLANTING PLAN – Identify all proposed plant species, water use, size and type.  Use drought‐tolerant, low‐maintenance adaptive plants and California natives where possible.  Provide all surface material, gravel, boulders, etc.

3.11 DETAIL SHEETS – Construction details of all proposed elements.

3.12 SPECIFICATIONS  –  Book  form  to  describe  required  materials,  workmanship  and  grading,  planting  and irrigation techniques.  Including requirements for contractor‐supplied as‐built drawings.

3.13 COST ESTIMATE – Calculations and detailed Cost Estimate to verify budget and bid documents.  Cost will be formatted to have estimate with several additional line items for alternate items.

3.14 SUBMITTALS – Sets of development plans for the Client; revise construction documents, as required, for approval.
 Submittal of construction drawings to Client will occur at 75%, 90% and 100%.  Submittal of Schedule A Bid Form and Schedule B for itemized elements.  If  requested,  incorporate  specifications  and  bid  form  into  the  Client’s  boiler  plate  and  general conditions to form a complete bid package.

Deliverables:
o Meetings with Staff for Review and Comments
o Construction Plans, Specifications and Details:
 1st Submittal – plans 50% complete, spec outline
 2nd Submittal – plans 75% complete, full spec review
 3rd Submittal – plans 90% complete, full spec review
 Final Submittal – plans 100% complete, final spec review  Permits Plats, as built drawings.
o MDG Construction Drawings with all sub‐consultant plans integrated o Revised Cost Estimate
o City Plan Review

TASK 4 – BID ADMINISTRATION and CONTRACT DOCUMENTS
Coordinate  bid  schedule  with  Client  Staff  and  throughout  the  bid  process.   It’s  important  that  Team  MDG  be available to walk the site with bidders, refer to RFIs and provide any additional information they need for bidding.

4.1 Bid Form development and refinement.  Distribution of information to contractors by City.

4.2 Pre‐Bid Meeting and Site Walk / RFIs / Addenda, if needed.

4.3 Bid Review by City and MDG.  Award of contract by City.

Deliverables:
o RFIs and Addenda as needed

Page 220 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
o Contract Documents

ADDITIONAL SERVICES AVAILABLE UPON REQUEST

TASK 5 – CONSTRUCTION ADMINISTRATION SUPPORT – Team MDG includes local engineers and designers located in downtown Hanford that can be onsite within minutes of notification.

Construction  Administration  is  crucial  to  completing  the  project.   The  City  and  MDG  can  cooperate  in  project management and inspections throughout the construction process.   There are key parts of the project that the design consultant needs to review and see.  We are happy to work on a T&M basis.  This is not currently part of the fee proposal.  Cost: TBD after scope is determined

5.1 MEETINGS – Pre‐Construction and regular Progress Meetings.

5.2 SUBMITTAL  REVIEWS  –  Team  MDG  will  review  and  accept  or  deny  required  contractor  submittals, cutsheets and samples for all disciplines; answer any RFIs.

5.3 SCHEDULED SITE VISITS – We feel confident that with Kyle McDonald from 4Creeks and Greg Mendonsa from Urban Tree Foundation we have ample local support to help with the administration of construction, and Greg of MDG will be on site as needed for all detailed design issues.  Team MDG will participate in the following inspections:  (approx. 14‐20)
 Grading, Utilities, Hardscape layout, Skate Park, Lighting, Irrigation, Planting, etc.  All inspections are important, but some key ones are:
 Soil preparation and grading inspections for all planting.  Finishes and color confirmation of materials.
 Skate Park and all concrete layouts and detail finishes.  Pre‐maintenance period observation and punchlist to confirm completion.  Final walk through/post‐maintenance period punchlist.

5.4 Final walk and sign off on project.

5.5 Certificate of Completion for Construction.

5.6 As‐Built Record Drawings.

Deliverables:
o RFIs, Submittal Acceptance, Inspections throughout construction o Preliminary and Final Design Checklist
o As‐Built Drawings – Certificate of Completion

GEOTECHNICAL and ORNAMENTAL SOILS REPORTS
MDG will have a local Geologist available to perform geotechnical boring and testing to ensure the project is based on accurate information.  This is not currently part of the fee proposal.  $8,500

CASp CERTIFIED REPORTING
MDG has a CASp‐Certified consultant available as the project requires.  This is not currently part of the fee proposal.  Cost: TBD if needed

Page 221 of 268 ends

Heroes Park
Project Timeline
TASK DESCRIPTION PLAN START Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Task 1 Project Management and Park Program Refinement
a)  Kickoff Meeting ‐ Coordinate w/ Client, staff and CAC b)  Create Project Schedule
c)  Coordination and Manage Project throughout Process, Quality Control d)  Refine Grant Program and Assess Needs of Community with City Staff e)  Develop Program of Elements
Task 2 Site Analysis, Master Plan and Cost Development and Public Outreach a)  Refine Park Program from City input
b)  Site Visit and Analysis
c)  Topographic Survey of Key Site Areas
d)  Create Base Map Using Existing Plans, Aerial Photos and Site Surveys e)  Create Master Plan with Design and Cost Alternatives and 3D Renderings f)  Community Engagement Workshop Meetings
g)  Revise and Update Alternatives and Present to City
h)  Develop Preferred Alternative and Cost and Present to PDT i)  Revise Final Schematic Master Plan Design and Cost and Gain City Approval j) Create Master Plan Booklet Summarizing the Design Process Task 3 Plans, Specifications and Estimates: Refining Design a)  Develop Digitized Final Site and Landscape Master Plan with 3D Rendering b)  Present Final Plan to City and Gain approval to Move On to 75%, 90% and 100% Construction Drawings c)  Create Specification Plans: Demolition, Grading, Electrical, Structural, Construction, Architectural, Elevation, Irrigation, Planting, Details, Specifications, Cost Estimate, Submittals d)  Include Specifications for As‐Built Drawings
e)  Provide Cost Estimate
f)  Create Sets of Development Plans for Submittal, including Construction Documents Task 4 Bid Administration and Contract Documents
a)  Bid Form Development and Refinement
b)  Pre‐Bid Meeting and Site Walk / RFIs / Addenda
c)  Bid Review by City and MDG. Award of Contract by City Task 5 Construction
a) Construction and Construction Administration

20252023 2024
LEGEND
Staff Coordination &
Review
Public / Stakeholder
Outreach In Person/virtual
Design and Production
Approval
Grand Opening!
Planning and Council Meetings will be
Coordinated Accordingly. Public and Staff
Meetings will be both in Person and Virtual.

Page 222 of 268 ends

820 BROADWAY ST CHICO CA 95928 ‐ 530.899.1616
1930 G ST SACRAMENTO CA 95811 ‐ 916.754.2153
MELTONDG.COM

Da’ Yas Park
Eureka, California
Dates:  April 2021 – current
Design Fee:  $353,000
Project Cost:  $5.8 million

Contact:

Donna Wood, Community Services Director,
City of Eureka
(707) 441‐4241, [email protected]

Relevant Staff Roles:

Greg Melton, Principal
Patrick Farrar, Project Manager
Ryan Riedlinger, Landscape Designer

Project Summary:

1. Natural themed design based on the
region’s cultural and physical geography.

2. A unique park identity and experience for
all users constructed by Landscape
Structures, Inc.
 Egret‐themed play structure
 Passive
and active fitness.
 Themed art and educational
experience throughout park.

3. Coordination with local tribes, artists and
stakeholders.

4. Uniting  the  existing  baseball  field  re‐
design  with  the  new  park,  creating  a  cohesive,  connected experience.

5. Stormwater management, education and incorporation into the park design.

6. Water conscious plant selection establishes native and culturally important plants.

7. New street corners designed for safety.

Site Elements:
 Contoured Grass‐Free Play
 Multi‐Use Game Area
 Nature Play Parkour
 Fitness Area
 1/2 mile of accessible Walking Path
 Updated Baseball Field and Amenities
 Concession/Restroom Building with Living Roof
 Neighborhood Connectivity at four park entries
 New and Improved Parking With EV Charging Stations

CUSTOM HIGHLIGHTS COMMUNITY!

From hand‐drawn sketch to manufacturing

Page 223 of 268 ends

1930 G ST SACRAMENTO CA 95811 ‐ 916.754.2153
820 BROADWAY ST CHICO CA 95928 ‐ 530.899.1616
MELTONDG.COM

Westacre Park
West Sacramento, California
Client:  City of West Sacramento

Project  Summary:  In  June  2022,  Melton  Design
Group,  Inc.  began  work  with  the  City  of  West
Sacramento to create a Master Plan
and  Construction  Drawings  for  the  renovation  of
Westacre  Park.  Through  community  workshops,
public  outreach  and  engaging  meetings  with  park
staff,
we were able to clarify the needs of the City to
evaluate park features and layout.  We found that the
West Sacramento area is in desperate need of more
Pickleball  courts,  so  our  Master  Plan  included  the following for both daily recreation and tournaments:
 Four new pickleball courts for community use.
 Two multi‐use courts, including pickleball and futsal.  Fencing around all courts.
 New landscape, including shade trees.
 Block wall for practice and noise reduction.
 Custom  school  bus  play  structure  symbolizing  the property originally being used for school bus storage.

Hewitt Park
Oroville, California
Client:  City of Oroville

Project  Summary:  Hewitt  Park  has  been
underutilized  for  far  too  long  and  over  the
past two years, MDG met with many Oroville
locals  to  gather  ideas  on  how  to  revitalize
this  space.   It  became  clear  to  us  that
pickleball is a very important activity
for the
public and should be a big part of the park.
 Eight spacious pickleball courts with
colored  concrete  for  an  enhanced
playing experience
 Spacious courts to accommodate all
abilities.
 On‐demand sports lighting that can
be  turned on by players  until 9  pm
for continued play after sunset.
 Shaded bleachers for spectators to watch games and tournaments.  Fencing with pickleball and railroad elements providing consistent theming throughout the park, which has two decommissioned locomotives.

Pickleball Courts with Shaded Bleachers at Hewitt Park
Pickleball Courts with Shade Trees and Practice Wall at Westacre Park

PICKLEBALL
IS ALL THE RAGE!

The “Flying Bus” Custom Adventure Play Structure
and Climbing Wall at Westacre Park

Page 224 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
West River Street Park
and Restoration
Riverfront Development and
Access
Truckee, California
Start Date: 2019 – Current
Contact Person:

Hilary Hobbs – Town of Truckee
10183 Truckee Airport Road,
Truckee, CA  96161
[email protected]
(530) 582‐2914

Project Cost:  $4.5 million (Phase 1, 2 & 3)
Design Fees:  $450,000

Relevant Staff Roles:

Greg Melton, Principal
Patrick Farrar, Project Manager
Sarah Crossley, Designer & 3D Graphics

Project Summary: The project is a 1.4‐acre
planned park and riparian edge restoration
project  on  West  River  Street  in  downtown
Truckee.

The project goals included the following:
 Provide a passive park with public river
access
 Restoration of riparian edge with
native plantings
 Education and interpretative panels
 Public open, social space
 Riverfront access and activated
riverfront play
 Multi‐Use Site
- Park Facility
- River‐oriented Commercial
- River Access
- Stormwater Treatment
Connectivity
- Expansion of Downtown
- To Legacy Trail bridge ang trail
- To Downtown Core and to natural
open space and river
 Greenhouse Benefits – air, habitat and
water quality
 Catalyst for riverfront development
 For more information, please visit https://www.townoftruckee.com/government/town‐manager/economic‐ development/west‐river‐site‐project
Retail Spaces (built by other) Available for Lease by Local Vendors Sundial and Interpretive Panels at River Overlook along with Complete Bank and Edge Restoration
ACTIVATING THE RIVER!

60 foot On‐Grade Slide   Large Climbing Boulder

Page 225 of 268 ends

820 BROADWAY ST CHICO CA 95928 ‐ 530.899.1616
1930 G ST SACRAMENTO CA 95811 ‐ 916.754.2153
MELTONDG.COM
Radio Park
Master Plan for Prop 68 and
Construction Documents

Fresno, California
Dates:  2019 – Current
Design Fee:  $529,000
Project Cost:  $5,942,000
Contact:  Kristina Chamberlin, City of Fresno,
(559) 621‐2900 /
[email protected]

Relevant Staff Roles:

Greg Melton, Principal
Daniel Louder, Project Manager
Aubrey Hendricks, Landscape Designer
Annaliese Kuhn, Drafting / Technician

Project Summary:  In 2019, Melton Design Group, Inc. began working with  the  City  of  Fresno  to  create  a  Master  Plan  for  Radio  Park  and create  a  competitive  Proposition  68  grant  application.   Through community workshops and public outreach, we were able to clarify the  needs  of  the  local  community  and  evaluate  park  features  and layout.  MDG is currently working in the DD phase of the process and will wrap up the project in 2023.  The process was talilored to meet as  many  of  the  Proposition  68  grant  requirements  as  possible  and focused  primarily  on  coordination  with  the  City’s  Departments  and the following elements:
 Creatied impactful gathering areas and provided play, education and socialization for all ages with inclusive design.
 Provided a sustainable design including water conservation, turf reduction and carbon sequestration with tree planting and the use of bio‐
carbon in the soil.  (LEED Certification and
SITES Initiative)
 Aided in the CCNR Grant Program (funded
by Prop 68) and Prop 84 Grant Program
processes.

Coordination with the City Staff and Departments:
 PARCS Recreation and Facilities
Department
 Department of Public Works
 Information Systems Department
 Tree Fresno – Tree Selection
Unique design elements of the park:
 Radio‐themed spray ground features
 Covered amphitheater
 Art walk and murals by local artists and Fresno State University  Inclusive play elements
Radio‐Themed Spray Element to match the Park
CELEBRATING ART and MUSIC!

Spray design with bolts of lightning in the Pour‐In‐Place Rubber Inclusive wheelchair teacup spinner

Page 226 of 268 ends

820 BROADWAY ST CHICO CA 95928 –  530.899.1616
1930 G ST SACRAMENTO CA 95811 –  916.754.2153
MELTONDG.COM
Riverbend Park
Post-Disaster Renovation
Oroville, California
Project Timeline: 2006‐ 2021
Contact: Deborah Peltzer,
Feather River Recreation and Park District
(530) 533‐2011 / [email protected]

Relevant Staff Roles:

Greg Melton – Lead Designer
Paige Gimbal – Project Manager

Control of Cost and Schedule:

Project Development Costs:   Design Costs:

Phase 1:  Actual Cost  $5,790,096  $249,201
Est. Cost  $5,540,000  $245,000
Phase 2:  Actual Cost  $1,363,038  $168,433
Est. Cost  $1,340,000  $168,000

Project Type: Riverfront Park Renovation
 Post‐Disaster Recovery and Clean Up
 Managed CAPRI insurance, FWS and FEMA claims
 Worked with DWR, CCC and the Spillway Contractors
to help clean up the site.

Riverbend Park:  A 120‐acre Park in Oroville, CA that sits on the Feather River was developed in 2003 by MDG and was
completely flooded in 2017 when the Oroville Dam Spillway failed.   Since  then,  MDG  went  through  Phase  1  and  is  in construction  process  of  Phase  2,  where  we  are  installing  a new amphitheater that will withstand any flood, as did the structures of 2003.

The two phases cover approximately 36 acres and include the renovation  of  new  boat  launch,  new  beach  /  waterfront, picnic and play, dog park renovation, new amphitheater with shelter,  play  structure  repair,  water  play  area,  three  multi‐ use  sports  fields,  boulder  climbing  structures  and  disc  golf course.  The program and design approach were focused on activating the park and creating economic opportunities.

Design with Maintenance in Mind:  In the process of design, MDG  makes  it  a  priority  to  speak  directly  with  the Maintenance  and  Operations
Staff.   This  is  critical  as  these
guys understand their capability and the City’s ability to fund the upkeep and maintenance of a park.   In this process, we find  out  about  the  nuances  of  the  project  sites,  drainage, soils, utilities... all are key to designing for easy maintenance in  the  future.   MDG  collaborated  with  hydrological  engineers  to  understand  the  new  flows  of  the  river  and appropriately reinforced the banks and structures to withstand future flooding.

RIVERFRONT RECLAIMED AFTER FLOOD!

New Riverbend Beach/Waterfront
Original shade structures designed by MDG withstood the 100,000 CFS
Multi‐functional amphitheater with river image running
through concrete

Page 227 of 268 ends

Contracting Agency
City of Visalia, CA
315 E. Acequia Avenue
Visalia, CA 93291
Contact Name
Rebecca Keenan
(559) 713-4541
Rebecca.Keenan@
visalia.city
4Creeks' Contract
Amount
$388,862
Construction Cost
$2,242,794
Funding Source
CMAQ
Date of Contract
2021
Status
Construction Completed
April 2021
4Creeks Project Manager
Elsa Mejia PE
559-802-3052
[email protected]
Loma Vista Village Green
Prime Consultant | Civil Engineering | Survey | Water Resources | Utility Coordination
Loma Vista Village Green was constructed on a City owned property north of Gettysburg Avenue between De Wolf and Leonard Avenue using City of Clovis Local Funds. This 7-acre park is located within the Loma Vista neighborhood of the City of Clovis. The Loma Vista community is intended to be a sustainable community of high-quality design, serving the immediate needs of its residents.

The Loma vista neighborhood has two master planned community centers – Community Center North and Community Center South. Village Green is the central focal point of the Community Center South Masterplan.

The project goal was to provide both active and passive uses, accommodating features such as amphitheater, open fields, seating areas, play equipment and the opportunity for food truck operations. Some unique features at Loma Village Green allow the park to accommodate community festivals, concerts, and the opportunity to lease the areas for public and private events. • The following are some major improvements included with the project. • Amphitheater band shell
• Pedestrians drop off area
• Clock Tower
• Sidewalks and Seating areas
• Landscaping and park lighting
• Ada curb ramps and offsite parking
• Paving and Utilities
This project is currently under construction and when completed, will promote healthier, happier living through pedestrian connectivity and pedestrian amenities, inviting the public to walk through their neighborhood.

Page 228 of 268 ends

U r b a n    T r e e    F o u n d a t I o n
V I s a l I a,   C A

urbantree.org
City of Visalia
Packwood Creek Trail

Project Description:

The Packwood Creek Trail incorporated 8 acres of unused street frontage into the City of Visalia’s overall trail system. The project was installed along Packwood Creek, creating 1/2 mile of new hiking trail. Native plants exclusively were used in the design of the trail and 90 trees were planted to revegetate the creek corridor. The project was constructed through a partnership with the City of Visalia, the Sequoia Conservation Corp and the Urban Tree Foundation. At risk youth from the conservation corp built the project under the management of UTF. A community planting day was held to celebrate Arbor Day, with about 40 residents coming out to help with installing plants.

Project Cost: $250,000.00

Page 229 of 268 ends

EVERYTHING WE LEARN BUILDING SKATEPARKS
FOR THE WORLD’S TOP PRO ATHLETES,
INSPIRES WHAT WE ROLL INTO YOURS.

HIGHLIGHTED PRIVATE PROJECT LIST:HIGHLIGHTED PRIVATE PROJECT LIST:
• Professional Competitions – ESPN X-Games, NBC Mountain Dew Tour, Kimberly Diamond Cup, D-Town Throwdown, Gravity Games, Vans Triple Crown, Eas
t Coast Surfing Championships
• Corporate Clients – Red Bull, Vans, Adidas, Gator
ade, MTV, Boost Mobile, Got Milk, Ford, Tedx, Hewlett Packard, Reese’s Puffs, Guinness Book of World Records, Kansas City Speedway, Warped Tour • Film/Television – Brink, Grind, Accepted, OPM’s “Heaven is a Half-Pipe” Some of our most challenging work has been in the private sector, designing and building for wheel sports industry companies and the world’s top professional skateboarders. After a rigorous vetting process, these clients consistently choose Spohn Ranch because of our unique ability to deliver quality terrain under any condition imaginable – including complex sites, logistical hurdles and extreme time constraints.

Our corporate clients and the athletes they host demand perfection when the skatepark is the stage for a live television event. The spacing between every obstacle has to be precise, the height and angle of every feature has to be perfect and the quality of the construction has to be flawless. With over 25 years of experience in this segment, we’ve really been able to hone our design and construction skill sets - injecting that attention to detail into all of our municipal projects.

QUALIFICATIONS CORPORATE SECTOR

Page 230 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM

Meet The Team
STAFF/PROJECT TEAM: ORGANIZATION CHART

Krazan & Associates, Inc.
www.krazan.com
(Optional Geotech Engineering Services)
Melton Design Group, Inc.
www.meltondg.com
SUPPORT TEAM and

VENDORS
PRINCIPAL DESIGN TEAM
Greg Melton
Principal
RLA #4217
Melton Design Group has assembled a Team of experienced professionals selected for excellence in their field.  Greg and the Team agree with the purpose, objectives and needs listed in your RFP.   Our Team is a uniquely qualified partner to do it.  We look forward to creating a blueprint for the future together.

MDG  staff  will  ensure  the  prompt  delivery  of  work,  control  of  budget  and  scope  and  coordination  between  the Principal‐in‐Charge and the Client.   Maintaining the project schedule and identifying and responding to issues that may arise requires frequent and effective communication.   Greg Melton will be your Principal‐in‐Charge and Ryan Riedlinger will be your Project Coordinator and primary contact.  Ryan will be available for all coordination meetings throughout the duration of the project.  Urban Tree Foundation/Wood Architecture and 4Creeks are local to the area and are very familiar with the City’s processes and infrastructure.  Meet your Dream Team:

Patrick Farrar
Senior Project
Manager
Ryan Riedlinger
Project
Coordinator
Matthew Ainley
Principal
Urban Tree Foundation /
Wood Architecture
www.urbantree.org
Greg Mendonsa
Project Manager
4Creeks, Inc.
www.4‐creeks.com
Kyle McDonald
Project
Manager
Spohn Ranch
www.spohnranch.com
Jason Baldessari
Director of Skate
Park Development
Sarah Crossley
Recreation
Specialist
Chris Slater Consulting
www.slatermep.com
(Electrical Engineering)
Rainforest Art Project
www.rainforestartproject.com
(Community Art Installations)
David Little
[email protected]
(CASp‐Certified Consultant)

Page 231 of 268 ends

GREG MELTON, RLA, LEED AP
PRINCIPAL LANDSCAPE ARCHITECT

Greg  Melton  has  been  planning  and
designing  recreation  facilities  for  over  35
years, providing many north state cities and
counties  with  successful  design  and
planning services.

One of Greg’s most valued assets is his ability to see and help clients understand the big picture of a project; how a person
may experience
a project site, understanding the relationship with a site’s history and translating these aspects into a physical and visual experience that is informative, fun, and aesthetically pleasing. Greg believes it takes a complete  team  to  design  and  build  a  project.  All  good  design  ideas need  to  be  vetted  against  our  quality  control.  All  projects  deserve quality materials for longevity and operation.

“All the  projects  we design  are  specific  for  each community  and  we are  proud  of that.”

Recent project experience includes lead design and cost services for:
 West River Park, Town of Truckee.
 Eastside Community Park Master Plan Update in Kerman for the Prop 68 Cultural and Resource Grant submittal.
 Eleanor  Nelson  Community  Park  design  services  for Community  Outreach,  Master  Plan  and  Cost  Analysis, Vacaville.
 Valley’s Edge 1,400‐acre Mixed Use Development. Recreation and  Parks  Design  for  Specific  Plan  and  Design  Guidelines  of 700+ acres of Park and Open Space in Chico.
 Mooretown Rancheria Community Park Master Plan, Grading and Utilities for existing 32‐acre area at Feather Falls Casino in Oroville.

EXPERIENCE
Melton Design Group, Inc.

Landscape Architects and Planners, Chico, CA – Principal Land Image
Landscape Architects and Planners, Chico, CA – Principal

On the Drawing Board
Sunset Whitney Recreation Area, City of Rocklin
This recreation area will provide a great space to create community.  The open space meanders through hundreds of homes and provides a  wealth of recreation, wellness, fire safety and a  great  place to  gather and be social.

Loving in this space will change your life and enhance your wellbeing through connection to nature and people.

Education

BS in Landscape Architecture, University
of Davis 1990
BS in Horticulture and Recreation
Planning, CSU Chico 1988

Registration

California Landscape Architect License
#4217
Nevada Landscape Architect License
#1062

Accreditation

US Green Building Council
LEED Accredited Professional

Awards

2021 California Parks and Recreation
Society (CPRS)
Award of Excellence‐Park Planning

2018 American Society of Civil Engineers:

Outstanding Urban or Land Development
Plan of the Year

2014 American Society of Landscape
Architects Honor and Merit Awards:

Parks/Open Space and Rehabilitation/
Mitigation

2009 California Redevelopment Assoc.:

Award of Excellence in Public Spaces

2007 Chico Economic Planning
Corporation: Community Vitality Award

2005 California Parks and Recreation
Society: Award for Facility Design and
Park Planning

Professional Affiliations

California Parks and Recreation Society
American Society of Landscape Architects
Building Industry Association

Page 232 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
MDG TEAM MEMBERS

RYAN RIEDLINGER, Project Manager
Melton Design Group, Inc.: 2021 to Present

Ryan joined the MDG team in 2021.  With roots set in Chico and his love of traveling, Ryan  is  extremely  familiar  with  the  local  area  and  much  of  the  North  State.   His background in agritourism brings a valued perspective to MDG.  His experiences have helped  link  initial  designs  with  a  project’s  ultimate  vision  and  activation  demands.

When not in the office, snowmobiling, trail riding, camping and traveling keep him very busy and further feed his knowledge and understanding of our northern communities.

EDUCATION
AS in Landscape Architecture (In Progress)

SELECT PROJECT EXPERIENCE
 Alturas Veterans Memorial Park
 Ummi’s Pathway, Colusa

 Legacy Park, Lakeport
 Prosperity Garden Park, Suisun City

SARAH CROSSLEY, Senior Project Manager
Melton Design Group, Inc.: 2015 to Present

Sarah Crossley joined the MDG team in 2015.  Sarah is passionate about all she does.

With her background in architectural design, she brings a  unique aesthetic to  MDG, which can be seen through her mission to create spaces that inspire happy living.  She also studies Design Psychology, bringing the “WHY” into our design solutions.

EDUCATION
BFA in Interior Architecture, CSU, Chico, 2015

SELECT PROJECT EXPERIENCE
 Railyard Town Center, Truckee
 Hewitt Park, Oroville

 Hope Plaza, Paradise
 Chapman Park, Chico

PATRICK FARRAR, Senior Project Manager
Melton Design Group, Inc.: 2020 to Present

Patrick has worked in the field of Landscape Architecture for over 25 years in all regions  of  California.   He  has  served  as  Lead  Project  Manager  and  Designer  on numerous  projects,  including  water  quality  projects  to  treat  pollution  and stormwater  runoff,  urban  streetscape  design,  urban  and  rural  trail  design  and community parks.

EDUCATION
BS in Landscape Architecture, Cal Poly State University, San Luis Obispo

SELECT PROJECT EXPERIENCE
 Riverside Park, Ukiah
 Da’ Yas Park, Eureka

 McKinleyville Skate Park
 Lakeridge Park, Magalia

Page 233 of 268 ends

Gregory A. Mendonsa
1512 W. Mineral King Ave. Visalia, Ca 93291 ph. 805.798.1585 fax. 559. 636. 3277 [email protected]

Experience:

Wood Architecture Inc. 2016 - Present  Landscape Architecture.

1. Schematic Plans.

2. Design Development.

3. Landscape construction documents.
 Plant procurement and tagging.
 Project management.
 Construction observation and administration.
 Past projects/clients.

1. Live Oak Subdivision & Community Park Complex.

2. Self Help Enterprises – Low-income housing developments (50-150 unit) in Visalia, Dinuba, and Goshen, CA.

3. Ginder Development – Upper scale multi-fam ily apartment developments (100-300 unit) in Visalia, Fresno, Clovis, and Tulare, CA.

4. Darling Hotel, Visalia, CA

5. 11 Confessions Winery, Santa Barbara County, CA.

Urban Tree Foundation (UTF), Project Manager 2016 - Present  Grant writing and cost estimating.
 Grant administration and project management.
 Planting and irrigation design.
 Project scheduling and ordering.
 Irrigation and planting installation.
 Past Projects/Clients.

1. East Side Regional Park; City of Visalia. Grant Writing, Technical Coordination and Landscape Design. $4M secured through Land & Water Conservation Fund. $1.3M secured through Urban Flood Protection Grant.

2. Hero’s Park; City of Hanford. Grant Writ ing, Technical Coordination and Landscape Design for new 40-acre park. $7M secured through state parks funding for park.

3. Hidden Valley Park; City of Hanford. Conceptual Design package for redevelopment and expansion of existing park.

Education:

California Polytechnic State University
San Luis Obispo
BLA - Bachelor of Landscape Architecture, Class of 2007

Licenses and Certifications:

Professional Landscape Architect (PLA) #6711.

Baseline Irrigation Controller – Advanced Certification

Page 234 of 268 ends

Akers Street & Riggin Avenue Improvements - Visalia, CA Project Manager
Mr. Ainley provided overall project management and project engineering for the project.

The construction of the newest Middle School within the Visalia Unified School District created several changes in the traffic impact which required the City of Visalia to provide major off-site street improvements. The major street improvement project included roadway removal, full street design, traffic signal, right of way acquisition, utility coordination, sanitary sewer, storm drain, signing, pavement delineation, and project bidding and construction assistance. The project cost approximately $2.87M for construction, not including right of way, design, or construction management.

Shannon Parkway Improvements, Roundabout, & Giddings Street Overlay - Visalia, CA Project Manager
Mr. Ainley provided overall project management and project engineering for the project. 4Creeks worked with the City to design a new roundabout at the Giddings Street and Shannon Parkway intersection, design approximately 1,800’ of new collector road on Shannon Parkway, and design an overlay on a portion of Giddings Street. The design was triggered by the construction of a new elementary school located on Giddings Street north of Shannon Parkway.

Tulare Avenue Improvements - Visalia, CA
Project Manager
Mr. Ainley provided overall project management and project engineering, with TJKM, Inc. as a subconsultant. The project entailed the design of Tulare Avenue in the City of Visalia from Lovers Lane to Visalia Parkway. The project included the construction of approximately one mile of new roadway for both Tulare Avenue and Visalia Parkway. The cornerstone of the project is a new traffic signal at the intersection of Lovers Lane, a high- speed arterial street, and Tulare Avenue, a new collector street. The design included removing median controls and reconstructing the existing curb returns. New storm drain and sanitary sewer pipelines were also designed between Lovers Lane and McAuliff Street.

Caldwell Avenue Widening & Improvements (Santa Fe Street to Lovers Lane) - Visalia, CA
Principal-In-Charge
This project is currently in design. Caldwell Avenue is major arterial roadway in the City and a heavily-traveled, regional corridor for motorists and bicyclists. The finished project includes widening 1.5 miles of Caldwell Avenue between Santa Fe Street and Lovers Lane.

Improvements include completely modified or rebuilt intersections, traffic signals, median improvements, sidewalk, curb, and gutter. The project also includes sewer mains, storm mains, and a street light system. There were significant Southern California Edison Co. transmission and distribution pole relocations coordinated with the project.

Santa Fe Street Signal Installation Project - Visalia, CA Project Manager
4Creeks was on a team with TJKM to provide assistance on this project. The overall objective of this project was to install four new traffic signals in downtown Visalia and install ai signal interconnect system to connect all four. The team prepared plans, specifications, and construction cost estimates for the design of new traffic signals and ADA access ramps at four Santa Fe Street intersections at Murray Avenue, Center Avenue, Main Street, and Acequia Avenue.

Matthew Ainley
PE, LEED AP BD+C
Principal-In-Charge
----------------------------------
Registrations & Certifications
Professional Engineer LEED AP - BD+C

California - No. 66233
Education
Bachelor of Science - Engineering & Physics
Westmont College Santa Barbara, CA
Work 20+ Years Experience
Phone +1 (559) 802-3052
Email [email protected]
Low-Impact Design Techniques
Streets & Transportation Design
Subdivision Design
Parks & Recreation Design
Storm Drainage Systems
Sanitary Sewer Systems
Land Use Planning
Commercial Site Design
Industrial Site Design | Irrigation & Ditch Design
Water Tank & Site Design
05/08-Present
4Creeks, Inc. - Visalia, CA
Principal-In-Charge / Founding Partner
02/01-05/08
Quad Knopf, Inc. - Visalia, CA
Department Manager / Civil Engineer

Page 235 of 268 ends

St. John's River Trail and Extension - Visalia, CA
Project Manager
Mr. McDonald served as Project Manager for this project which was a key component to connect pedestrian and bicycle travel to the Visalia Sports Park. The project was the design of more than one-mile of Class 1 trail within the Santa Fe Street corridor connecting the existing trail at Riggin Avenue and St. John's Parkway extending towards the St. Johns' River and Dinuba Boulevard (State Route 63), crossing underneath the existing bridge, and connecting to the Visalia Sports Park. The final design was in accordance with the requirements of Caltrans, Kaweah Delta Water Conservation District (KDWCD), and the City of Visalia.

Greenway Trail - Visalia, CA
Project Engineer
Mr. McDonald and the 4Creeks team provided Community Relations, Civil Engineering and Land Surveying Services for the City of Visalia’s Greenway Trail Project. The trail is designed within the SCE Tower Easement which is along the eastern border of town running north and south. The 3-mile trail construction is estimated at $3 million for construction cost. Greenway Trail is a critical piece to the City of Visalia’s Water Ways and Trails Master Plan, as it will connect four other trails in town. The project started out with a conceptual plan..

Creekside Park - Visalia, CA
Project Engineer
The park master plan was prepared following a community input process in which The HLA Group presented three design alternatives. Park elements were prioritized and resulted in a final approved park master plan. A natural theme was established in the design to emphasize its location adjacent to an open space/detention basin. Mr.

McDonald provided Research & Data Acquisition, Construction Plans, Culvert Crossing Design, Packwood Creek Lift Station Design and Construction Administration.

CMAQ Downtown Park & Ride - Tehachapi, CA
Project Manager
Mr. McDonald and his team provided engineering design services for the Kamm Avenue at Alta Avenue Roundabout, which was funded by three sources: CMAQ funds, Transportation Impact Fees (TIF), and funds from Dinuba Unified School District. The major street rehabilitation project included the full construction and design of 800' of Kamm Avenue and 775' of Alta Avenue. The roundabout has a 222' inscribed circle diameter and was designed per NCHRP Report 672 and the Caltrans Highway Design Manual.

Santa Fe Street & Tulare Avenue Roundabout - Visalia, CA Project Engineer
Kyle and his team worked with the City of Visalia to provide engineering services for the CMAQ-funded Tulare Avenue at Santa Fe Street Roundabout. A 35’ offset of the northbound and southbound lanes caused confusion amongst drivers which led to traffic congestion at the intersection. During peak hours, traffic often blocked entrances to businesses and homes. Mr. McDonald and his team recently celebrated the completion of the roundabout. The roundabout has mitigated the traffic issues caused by the initial abnormal layout of the streets.

Akers Street & Riggin Avenue Improvements and Flagstaff Roundabout - Visalia, CA Project Engineer
The project included roadway removal, full construction design, traffic signal installation, right of way acquisition, utility coordination, sanitary sewer, storm drain, striping, signage, and project bidding and construction assistance. This project constructed 0.5 miles of Akers Street, with median improvements, and included sidewalk, curb, and gutter along its west side from Riggin Avenue to just north of the new Ridgeview Elementary School. The project also constructed approximately 0.2 miles of Riggin Avenue. As part of the project, Flagstaff Street was installed on the south side of the new middle school and included a new roundabout.

New Dinuba High School - Dinuba, CA
Project Engineer
Mr. McDonald assisted the City of Dinuba with the new Dinuba High School and needed off-site improvements. Mr. McDonald led his team and provided on-site and off-site design. This project included water, storm drainage, sewer, dry utilities, and an 84” underground culvert along the frontage road of Alta Avenue.

Kyle McDonald

PE, QSD, MBA
Project Engineer
_________________________
Registrations & Certifications
Professional Engineer
California - No. 82531
Qualified SWPPP Developer (QSD)
California - No. C82531
MBA - General Management California State
University, Fresno Fresno, CA
Bachelor of Science - Civil Engineering
California State University Fresno, CA
Work
12+ Years Experience
Phone +1 (559) 802-3052
Email [email protected]
Storm Drainage Systems
Sanitary Sewer Design
Commercial Site Design
Subdivision Design
Water Tank & Site Design
Street & Transportation Design
Surveying
Construction Management
Utility Coordination | Cost Estimating
Structural Analysis & Design | AutoCAD Civil 3D
10/10-Present
4Creeks, Inc. - Visalia, CA
Civil Engineer
05/08-01/09
GMA Engineering, Inc. - Fresno, CA
Junior Engineer

Page 236 of 268 ends

KEENE, NH PARKS & RECREATION SKATEPARK DESIGN-BUILD SERVICES PROJECT TEAM SPOHN RANCH, INC.

JASON

BALDESSARI

DIRECTOR OF DIRECTOR OF

SKATEPARK DEVELOPMENTSKATEPARK DEVELOPMENT
Born and raised in New Jersey, surfing was Jason’s first love. Given the inconsistencies of Jersey waves however, Jason immersed himself in the full spectrum of East Coast action sports - whether in the ocean, the streets or the mountains. With a passion for the outdoors, Jason naturally transitioned into a career in the recreation industry in 2005. In 2008, he pulled the trigger on a long overdue relocation to a climate that better suited his love for action sports, landing in Southern California and becoming a full-time member of Spohn Ranch. Since then, Jason’s AutoCAD and critical thinking skills have led interdisciplinary teams for 150+ projects across 40+ states – always focused on innovative design.

SKILLS + EXPERTISESKILLS + EXPERTISE
wheel sports design | AUTOCAD

LANDSCAPE ARCHITECTURE
SITE ANALYSIS | CONCRETE
GRADING & DRAINAGE | STEEL
COST ESTIMATING | SCHEDULING

GOVERNMENT CONTRACTING

PROJECT MANAGEMENT
PROJECT ROLE:PROJECT ROLE:

Project Manager
& Lead Designer
EDUCATION:EDUCATION:

Bachelor of Science,
Monmouth University
EXPERIENCE:EXPERIENCE:
25+ years skateboarding
15+ years in wheel sports industry
ACCREDITATIONS:ACCREDITATIONS:

LEED Green Associate
California Park & Recreation Society
BACKGROUND:BACKGROUND:
• Cooper P ark Skatepark - Brooklyn, New York
•
Iles P
ark Skatepark - Springfield, Illinois
•
Copper Sky Sk
ate Plaza - Maricopa, Arizona
HIGHLIGHTED PROJECT LIST:HIGHLIGHTED PROJECT LIST:
• Cape Ma y County Skatepark - Ocean City, New Jersey
•
P
acific Highlands Ranch Pump Track - San Diego, California •
Riy
adh BLVD Skatepark - Riyadh, Saudi Arabia

Page 237 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
Our Past Supports Your Future

FIRM QUALIFICATIONS

The experience of the MDG staff is focused on Parks and Recreation but includes many other design features including park identity and branding, urban‐social and recreation spaces, open space and restoration.  Our creative solutions have helped many agencies build unique parks and spaces that have become icons for their communities and stand out in their memory for years.

We work to completely understand your community, your stakeholders and how this park can best serve your community.  Our design strategies also incorporate revenue generating opportunities for clients by creating multi‐ use venues with potential for income, such as combination bandshell, picnic areas or birthday rings.   Designing parks to be multifunctional, providing recreation and special community events, is essential.

The following is a comprehensive list of diverse projects to get a sense of MDG’s history and quality projects.

COMMUNITY and NEIGHBORHOOD PARKS
 Quigley Park, Fresno, CA – 8 acres
 Radio Park, Fresno, CA – 7 acres
 Katie’s Kids Park, Kerman, CA – 4 acres
 Original Riverbend Park, Oroville, CA – 120 acres
 Eleanor Nelson Park, Vacaville, CA – 12 acres
 West River Park, Truckee, CA – 1.4 acres
 Valley’s Edge Specific Plan Parks, Chico, CA – 160 Acres  Turtle Bay Exploratorium Adventure Park, Redding, CA
 Baroni Park, Chico, CA – 4 acres
 Wildwood Park, Chico, CA – 7 acres
 Westside Community Park, Lakeport, CA – 70 acres
 DeGarmo Park, Chico, CA – 36 acres
 Noble Park, Paradise, CA – 7 acres
 Shastina Community Park, Redding, CA – 14 acres
 Walnut Park, Winters, CA – 4 acres

RENOVATED PARKS
 Da’ Yas Park, Eureka, CA
 Riverside Park, Ukiah, CA
 Eastern Oak Park, Sacramento, CA
 Austin Park and Highlands Park, Clearlake, CA
 Turtle Bay: Babes Coral, Redding, CA
 Bille Park, Paradise, CA
 Caper Acres, Chico, CA
 Post‐Flood Riverbend Park, Oroville, CA
 Hope Plaza, Paradise, CA
 Paradise Community Center, CA

Page 238 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
CURRENT ON‐CALL SERVICES
 City of Fresno
 City of Chico
 City of Yuba City
 City of Clovis
 City of Wheatland
 Chico Area Recreation and Parks CARD
 City of Davis
 City of Oroville
 Feather River Recreation and Parks
 Paradise Recreation and Parks
 City of Grass Valley
 Marysville Joint Unified School District

OPEN SPACE and TRAILS
 Bidwell Park Range Remediation‐Oak Woodland, Chico, CA  Verbena Fields – 20‐acre Creek Restoration, Chico, CA  Live Oak Community Trails / Pocket Parks, Live Oak, CA  California Park Chain of Ponds and Trail System, Chico, CA  Riverbend Community Park, Oroville, CA
 El Dorado Hills Town Center, El Dorado Hills, CA

HABITAT RESTORATION
 Riverside Park, Ukiah, CA
 North Park, Davis, CA
 Little Chico Creek Floodplain Restoration, Chico, CA
 Kachituli Oxbow – Riparian Corridor, Sacramento, CA
 South Volante Park Wetland Restoration, Anderson, CA
 Shauna Downs Wetland Bank, Durham, CA
 Big Chico Creek Floodplains, Chico, CA
 Putah Creek Parkway, Davis, CA

WATER CONSERVATION PLANS
 City of Davis and Woodland Conservation Plan, CA
 Elk Grove Community Park Water Reduction Plan, CA
 Chestnut Park Water Reduction Study, Davis, CA
 HACB Countywide Conservation Plan

CITY and RECREATION DISTRICT MASTER PLANS
 Valley’s Edge Specific Plan Receation Element, Chico, CA  CARD Master Plan Update 2013, Chico, CA
 Feather River Recreation Park District 2020 Master Plan  Red Bluff Parks and Recreation 2015 Master Plan, CA
 CARD 2030 Master Plan Update, Chico, CA
 City of Chico Design Guidelines Manual, CA

STREETSCAPES / BRANDING and WAYFINDING
 City of Gridley Downtown Demonstration Project, CA
 Feather River Boulevard Revitalization Plan, Oroville, CA  West Gateway Mixed Use District, Hollister, CA
 El Dorado Hills Town Center Amphitheater, CA
 Murieta West Planning Area, Rancho Murieta, CA
 Heart of Fairfield Gateway and Branding, Fairfield, CA

Page 239 of 268 ends

820 BROADWAY ST CHICO CA 95928 – 530.899.1616
1930 G ST SACRAMENTO CA 95811 – 916.754.2153
MELTONDG.COM
We Make a Statement

DISCLOSURES

LITIGATION DISCLOSURE

We hereby indicate that we have not had any lawsuits or litigation resulting from any public agency project undertaken by our firm within the last five (5) years nor any project where a claim or settlement was paid by our firm or our insurer within the last five (5) years.

CONFLICT OF INTEREST DISCLOSURE

We  hereby  indicate  that  we  have,  to  the  best  of  our  knowledge  and  belief,  no  potential  financial, business or other relationship with City of Hanford that would have an impact upon the outcome of this contract or the construction of the project.

We also have no current clients who, to
our knowledge and belief, may have a financial interest in the outcome of this contract or the construction project that will follow.

We have no financial interest or relationship with any construction company that may submit a bid on the construction project.

Page 240 of 268 ends

820 BROADWAY ST CHICO CA 95928 - 530.899.1616
1930 G ST SACRAMENTO CA 95811 - 916.754.2153
MELTONDG.COM
Let Our Clients Do the Talking

REFERENCES

The following are references for agencies like yours with projects similar to those that often come up through an as‐needed, on‐call agreement.

City of Fresno, Public Works Department  2600 Fresno Street, Suite 4016, Fresno, CA  93721 Ed Chinevere, PARCS Assistant Director
(559) 903‐6033    [email protected]
Nathan Sanchez, Projects Administrator
(559) 621‐8682    [email protected]
Projects:  Radio Park
Quigley Park
Armstrong‐Hamilton Tot Lot

City of West Sacramento  1110 West Capitol Avenue, 1st Floor, West Sacramento, CA  95691 Traci Michel, Parks and Recreation Director
(916) 617‐4627    [email protected]
Projects:  Westacre Park

City of Vacaville  650 Merchant Street, Vacaville, CA  95688 Reggie Hubbard, Parks and Recreation Manager
(707) 449‐5650    [email protected]
Projects:  Sierra Vista Park
Alamo Creek Park
Eleanor Nelson Park

City of Rocklin  5460 5th Street, Rocklin, CA  95677
Kevin Huntzinger, General Manager
(916) 625‐5269    [email protected]
Projects:  Sunset Whitney Recreation Area Master Plan

Chico Area Recreation District  545 Vallombrosa Avenue, Chico, CA  95928 Annabel Grimm, General Manager
(530) 895‐4711    [email protected]
Projects:  Rotary Centennial Park
Chapman Park
Caper Acres Park
DeGarmo Park
CARD Rose Garden and Event Facility

Page 241 of 268 ends

25 NON-COLLUSION AFFIDAVIT
(Submit with Proposal Attachment 1)
TO: THE CITY OF HANFORD
The undersigned, in submitting a proposal for performing the following work by contract, being duly sworn, deposes and says:

That he/she has not, either directly or indirectly, entered into any agreement, participate in any collusion, or otherwise taken any action in restraint of free competition in connection with such contract.

Work to be performed: RFP No. 2023-14
Professional Architectural And Engineering and Design Services Heroes Park Proposer’s Name: ______________________________________________________ Signature of Proposer: ___________________________________________________ Title: _________________________________________________________________ Business Address: ______________________________________________________ Place of Residence: _____________________________________________________ State of California
County of ________________________
On this __________ day of _______________before me, ___________________________________________, a Notary Public, personally appeared ____________________________________________,who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct
WITNESS my hand and official seal.

Signature __________________________________ (Seal)
Melton Design Group, Inc.

Gregory Melton
820 Broadway Street, Chico, CA 95928
711 Parkwood Drive, Chico, CA 95928
Butte
____________________________________ __________________ __________________________ ______________________________________ ___________________________________________________________________

Page 242 of 268 ends

26 WORKERS’ COMPENSATION INSURANCE CERTIFICATE
(Submit with Proposal Attachment 2)

STATE OF CALIFORNIA )
) ss

CITY OF HANFORD )
I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work under this contract.

Company: ____________________________________________________ Business Address: ______________________________________________ Signature: _____________________________________________________ Name of Signing Official: ________________________________________ Title of Signing Official: _________________________________________ Date: ____________________________________________________ Company Seal:

Melton Design Group, Inc.
820 Broadway Street, Chico, CA 95928
Gregory Melton
President/CEO
06/30/2023
Addressssssssss: :: _____________
_____________________________________________________________________________ _____________

Page 243 of 268 ends

27 EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE CERTIFICATE
(EXECUTIVE ORDER 11246)
(Submit with Proposal Attachment 3)
Equal Opportunity Clause
Unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to Executive Orders 10925, 11114 or Section 204 of Executive Order 11246 of September 24, 1965, during the performance of each contract with the City of Hanford, the Proposer agrees as follows:

1. The proposer will not discriminate against any employee or applicant for employment because of race, color, religion, gender, national origin or political affiliation. The proposer will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, gender, national origin or political affiliation. Such action shall include, but not be limited to, the following: employment upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The proposer agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause.

2. The proposer will, in all solicitations or advertisements for employees, placed by or on behalf of the proposer, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, gender, national origin or political affiliation.

3. The proposer will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided by the agency contracting officer, advising the labor union or the workers’ representative of the proposer commitments under Section 202 of Executive Order 11246 of September 24, 1965, and shall post copies of the notice on conspicuous places available to employees and applicants for employment.

4. The proposer will comply with all provisions of Executive Order 11246 of September 24, 1965, and the rules, regulations and relevancy orders of the Secretary of Labor.

5. The proposer will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations and relevant orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations and orders.

6. In the event of the proposer’s non-compliance with the non-discrimination clauses of this subcontract or with any of such rules, regulations or orders, this subcontract may be canceled, terminated or suspended, in whole, or in part and the proposer may be declared ineligible for further government contracts in accordance with the procedures authorized in accordance with Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation or order of the Secretary of Labor, or otherwise provided by law.

7. The proposer will include the provisions of Paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The proposer will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however, that in the event the proposer becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the proposer may request the United States to enter into such litigation to protect the interest of the United States.

Company Name: _________________________________________________________ Business Address: ________________________________________________________ Signature: _______________________________________________________________ Name of Signing Official (type): _____________________________________________ Title of Signing Official (type): ______________________________________________ Date: ___________________________________________________________________ (Seal) Melton Design Group, Inc.
820 Broadway Street, Chico, CA 95928
Gregory Melton
President/CEO
06/30/2023
ame ____
dressssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss ::::::::::::::: ::::::::::::: ______________________ _____________________________________________________________________________________ ___________________ gninggggggggg Official (type): __
820
Broadway
______________
__________ _
____
Gregor
___________
________ _
P iden

Page 244 of 268 ends

28 AMERICANS WITH DISABILITIES ACT COMPLIANCE CERTIFICATE (Submit with Proposal Attachment 4)
By submission of a bid, the BIDDER certifies it will comply with the Americans with Disabilities Act, 42 U.S.C., 12101 et. seq., and will maintain compliance throughout the life of this Contract. By commencing performance of the Contract work, the selected BIDDER certifies to the Americans with Disabilities Act compliance.

Company: __________________________________________________________ Business Address: ____________________________________________________ Signature: __________________________________________________________ Name of Signing Official (typed): ______________________________________________ Title of Signing Official (typed): _______________________________________________ Date: _______________________________________________________________ Company Seal:

Melton Design Group, Inc.
820 Broadway Street, Chico, CA 95928
Gregory Melton
President/CEO
06/30/2023
Address: ______________________ ____________
________________ ___________________ _______________________ _____________ gniniiniinininiiniiinininiiiinninnnnnnnnnnnnnnnnnnnng Official (typed):

Gr

Page 245 of 268 ends

29 CITY OF HANFORD, CA

OWNERSHIP DISCLOSURE FOR CONTRACTORS AND CONSULTANTS
(Submit with Proposal Attachment 5)

NAMES OF PRINCIPALS, PARTNERS, AND/OR TRUSTEES:

NAMES OF PRINCIPALS, PARTNERS, AND/OR TRUSTEES:

Firm Name: ___________________________________________________________ Firm Address: _________________________________________________________

List the names of all principals, partners, and/or trustees. For corporations provide names of officers, directors and all stockholders owning more than 10% equity interest in corporation:

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

Submitted by: Name __________________________________________________________ Date __________________________________________________________

Melton Design Group, Inc.
820 Broadway Street, Chico, CA 95928
Gregory Melton, President/CEO
Christa Melton, Secretary
Teresa Walsh, Office Manager/Controller
06/30/2023

Page 246 of 268 ends

30 STATE OF CALIFORNIA DRUG-FREE WORKPLACE CERTIFICATION STD.21 (REV.12- 93)
(Submit with Proposal Attachment 6)
I, the official named below, hereby swear that I am duly aut horized legally to bind the contractor or grant recipient to the certification described below. I am fully aware that this certification, executed on the date below, is made under penalty of perjury under the laws of the State of California.

Contractor Proposer Firm Name: ________________________________________________________ Federal ID Number: __________________________________________________________________ BY (Authorized Signature): ____________________________________________________________ Date Executed: ______________________________________________________________________ Printed Name of Person Signing: ________________________________________________________ Telephone Number (Including Area Code): ________________________________________________ Title: ______________________________________________________________________________ Contractor/Proposer Firm’s Mailing Address: ______________________________________________ The contractor or grant recipient named above hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. The above named contractor or grant recipient will:

1. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by Government Code Section 8355(a).

2. Establish a Drug-Free Awareness Program as required by Government Code Section 8355(b), to inform employees about all of the following:
(a) The dangers of drug abuse in the workplace,
(b) The person’s or organization’s policy of maintaining a drug-free workplace, (c) Any available counseling, rehabilitation and employee assistance programs, and (d) Penalties that may be imposed upon employees for drug abuse violations.

3. Provide as required by Government Code Section 8355©, that every employee who works on the proposed contract or grant:
(a) Will receive a copy of the company’s drug-free workplace policy statement, and (b) Will agree to abide by the terms of the company’s statement as a condition of employment on the contract or grant.

4. At the election of the contractor or grantee, from and after the “Date Executed” and until ____________ (NOT TO EXCEED 36 MONTHS), the state will regard this certificate as valid for all contracts or grants entered into between the contractor or grantee and this state agency without requiring the contractor or grantee to provide a new and individual certificate for each contract or grant. If the contractor or grantee elects to fill in the blank date, than the terms and conditions of this certifi cate shall have the same force, meaning effect and enforceability as if a certificate were separately, specifically, and individually provided for each contract or grant between the contractor or grantee and this state agency.

Melton Design Group, Inc.
81-4870004
06/30/2023
Gregory Melton
530-899-1616
President/CEO
820 Broadway Street, Chico, CA 95928
_____________________________________________________________ ________________ __________________________________________________________________________________________________________________________________ __________________________________ _____________________ ____________________________ ____________ _____
4870000000000000000000000000000000000000000000000000000000000000000000000004 /2023

Page 247 of 268 ends

Initial: City______ Consultant______
1 AGREEMENT FOR SERVICES

This Agreement for Professional Services (“Ag reement”) is made and entered into this 16th day of October, 2023, by and between the City of Hanford, a municipal corporation (“City”), and Melton Design Group (“Consultant”).

RECITALS

A. Consultant represents to City that they are specially trained, experienced, licensed and competent to perform the services which will be required by this Agreement; and

B. Consultant represents to City that it possesses th e skill, experi ence, ability, background, certification and knowledge to provide the services described in this Agreement on the terms and conditions described herein.

C. City desires to retain Consultant to render financial auditing services as set forth in this Agreement.

NOW THEREFORE, in consideration of the mutu al covenants set forth herein for such other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties hereto agree as follows:

1. Retention of Consultant. Subject to the terms and conditions set forth herein, City retains Consultant to perform the services identified in this Agreement, as an independent contractor and Consultant hereby accepts this independent contractor appointment.

2. Scope of Services and City Responsibilities.

a. Consultant shall perform the services (“Services”) an d the City shall have the responsibilities described on the attached Exhibit “A,” which is incorporated herein by reference. To the maximum extent po ssible, the terms of the body of this Agreement and Exhibit “A” shall be interpreted so they are consistent; however, if there is an direct and irreconcilable conflict between the text of this Agreement and Exhibit “A”, the former shall control.

b. Consultant shall correct any and all errors and/or omissions, which arise out of Consultant’s negligence or intentional misconduct, in the performance of the Services and any documents resulting therefrom even though City has accepted said Services or documents. Consultant shall make such corrections upon City’s request and at no cost or expense to City.

3. Time of Performance. Services shall be complete d by the dates identified in the attached Exhibit “A.”

4. Compensation. Compensation to be paid to Consultant shall be in accordance with the attached Exhibit “A.” Payment by City under this Agreement shall not be deemed a waiver of errors, even if such errors were known to the City at the time of payment.

Page 248 of 268 ends

Initial: City______ Consultant______
2 5. Method of Payment. Consultant shall submit monthly billings to City describing the work performed during the preceding month. Consultant’s bills shall include a brief description of the Services performed and the date the Services were performed the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than sixty (60) calendar days after the date of submittal of an invoice for completed tasks and approval of the invoice by City staff.

6. Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Services, but wh ich are not in cluded in Exhibit “A.” Extra work will be performed on terms agreed upon by the parties. Consultant shall not perform, nor be compensated for Extra Work without written authorization from City.

7. Termination. This Agreement may be terminat ed by the City immediately and without notice for cause or by City without cause upon ten (10) days’ written notice of termination to Consultant. Upon termination, Consultant shall be entitled to compensation for Services performed up to the effective date of termination, unless this Agreement is terminated for cause, in which case, City may withhold compensation due Consultant in order to reimburse City for any losses, damages or expenses caused by Consultant’s default under this Agreement.

8. Ownership of Documents. All plans, studies, documents and other writings and electronic disks containing drawings prepared by and for Consultant, its officers, employees, agents and subcontractors in the course of implementing this Agreement, except working notes and internal documents, shall become the property of the City, and the City shall have the sole right to use such materials in its discretion with out further compensation to Consu ltant or to any other party.

Consultant shall, at Consultant’s expense, provide such reports, plans, studies, documents and other writings to City upon written request.

However, the City’s use of completed documents for other projects and/or the use of uncompleted documents without the written authorization of Consultant will be at the City’s sole risk.

The City shall, to the fullest extent permitted by law, indemnify and hold harmless the Consultant from all claims, damages, losses, and expenses, including attorney fees, arising out of or resulting from any unauthorized reuse of, or changes to the Project Documents not performed by the Consultant.

9. Licensing of Intellectual Property. This Agreement creat es a non-exclusive and perpetual license for City to use, modify, reuse or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data electronic or otherwise recorded on computer diskettes which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”).

Consultant shall require all subcontractors to agree in writing that City is granted non-exclusive and perpetual license for any Documents & Data the s ubcontractor prepared under this Agreement.

Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. City shall not be limited in any way in its use of the Documents & Data at any time, provided that any such use not within the purpose intended by this Agreement shall be at City’s

Page 249 of 268 ends

Initial: City______ Consultant______
3 sole risk. The City shal l, to the fullest extent permitted by law, indemnify and hold harmless the Consultant from all claims, damages, losses, and expenses, including attorney fees, arising out of or resulting from any unauthorized reuse of or changes to the Project Documents not performed by the Consultant.

10. Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents & Data either created by or provided to Consulta nt in connection with the perform ance of this Agreement shall be held confidential by Consulta nt. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services under this Agr eement, nor shall such ma terials be disclosed to any person or entity not connected with the performance of the Services under this Agreement. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City’s name, insignia, photographs, or the project for which Consultant’s Services are rendered, or any publicity pertaining to the Consultant’s Serv ices under this Agreement in any magazine, trade paper, newspaper, television or radio production or other similar medium without th e prior written consent by City.

Notwithstanding the foregoing, the City acknowledges that the Consultant may want/need to include projects performed under this Agreement on proposals for similar work in the future. The City hereby grants permission to list any projects performe d under this agreement for marketing purposes; provided however, Consultant will not make any representations regarding City’s satisfaction with Consultant’s work product unless Consultant receives a written statement or evaluation from City.

11. Equal Opportunity Employment . Consultant represents that it is an equal opportunity employer and it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, handicap, ance stry, sex or ag e. Such non- discrimination shall incl ude, but not be limited to, all activities related to initia l employment, upgrading, demotion, transfer, recr uitment or recruitment advertis ing, layoff or termination.

Consultant shall also comply with all relevant provisions of City’s programs or guidelines currently in effect as identified and provided to Consultant by City.

12. Insurance Requirements.

a. Consultant, at Consultant’s own cost a nd expense, shall procure and maintain, for the duration of this Agreement, the following insurance policies.

i. Workers Compensation Coverage. As required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with a limit of no less than ONE MILLION AND NO/100 DOLLARS ($1,000,000) per accident for bodily injury or disease.

ii. Commercial General Liability (CGL) Coverage. Insurance Services Office (ISO) Form CG 0001, including products and completed operations, with a limit of no less than TWO MILLION AND NO/100 DOLLARS ($2,000,000) per occurrence for bodily injury, personal injury, and property damage, and a general aggregate limit of no less than FOUR MILLION AND NO/100 DOLLARS ($4,000,000).

Page 250 of 268 ends

Initial: City______ Consultant______
4 iii. Automobile Liability Coverage. ISO Form Number CA 0001 covering any auto (Code 1), or if Consultant has no owned autos, Code 8 (hired) and 9 (non-owned),with a limit no less than ONE MILLION AND NO/100 DOLLARS ($1,000,000) per accident for bodily injury and property damage.

iv. Professional Liability Coverage. Consultant will maintain Professional Liability coverage with limits no less than TWO MILLION AND NO/100 DOLLARS ($2,000,000) per occurrence or claim, and TWO MILLION AND NO/100 DOLLARS ($2,000,000) policy aggregate.

If Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by Consultant.

Consultant’s insurance polic ies shall be “occurrence” poli cies and not “claims-made” coverage except for Professional Liability Coverage. “Claims-made” polic ies must satisfy the following requirements: (i) the retroactive date of coverage must be shown and must precede the effective date of the contract; (ii) coverage shall be maintained and evidence of coverage must be provided for at least five (5) years after completi on of the contract work; and (iii) if coverage is canceled or non-renewed and not replaced with another claims-made policy form with a retroactive date preceding the contract effective date, Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

Consultant may maintain an Umbrella policy in conjunction with th e insurance policies referenced above. In such case, Consultant sh all be deemed to have satisfied the insurance requirements of this contract as long as: (i) th e coverage limits of the Umbrella policy and of the underlying liability policy(ies), when combined, satisfy each of the per occurren ce and aggregate requirements identified in this section; and (ii) coverage under the Umbrella policy is as broad as and includes all incidents and events covered by the underlying insurance that it supplements.

b. Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require Consultant to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. Alternatively, the City may require Consultant to provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses within the retention.

c. The policies are to contain, or be endorsed to contain, the following provisions:

i. The City and its offi cers, officials, employees, and volunteers are to be covered as additional insureds on the CGL and automobile liability policies with respect to liability arising out of work or operations performed by or on behalf of Consultant including materials, parts, or equipment furnished in connection with such work or operations; products used by Consultant; or automobiles owned, leased, hire d or borrowed by Consu ltant. General liability coverage can be provided in the form of an endorsement to Consultant’s insurance at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33 or CG 20 38 and
CG 20 37 if a later edition is used. The coverage shall contain no special limitations on the scope of protection afforded to the City and its officers, officials, employees or volunteers.

Page 251 of 268 ends

Initial: City______ Consultant______
5 ii. For any claims related to this contract, Consultant’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City and its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City and/or its officers, officials, employees, or volunteers shall be in excess of Consultant’s insurance and shall be non-contributory.

iii. Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City.

Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII.

Consultant shall furnish the Ci ty with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the ri ght to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

d. Consultant hereby grants to the City and its officers, officials, employees, and volunteers a waiver of any right to subrogation which any insurer of Consultant may acquire against the City and/or its officers, officials, employees, and volunteers by virtue of the payment of any loss under such insurance. Consultant agrees to obtain endorsements necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

13. Indemnification. To the fullest exte nt allowable by law, Consultant agrees to indemnify, defend and hold harmless the City and its officials, officers, employees, agents and volunteers from and against all claims, demands, actions, injuries, liabilities, losses, costs or damages, direct or indirect, and any and all attorneys’ fees and other expenses which City or its officials, officers, employees, agents or volunteers may sustain or incur as a consequence of or are in any way related to Consultant’s or its owners, director s, officers, managers, employees, agents and subcontractor’s willful or neglig ent acts or omissions in the pe rformance of the services and Consultants responsibilities and obligations to be performed under this agreement or its failure to perform or comply with any of its obligations or responsibilitie s contained in this agreement; excluding, however, such liability, claims, losses, damages or expenses arising from City’s sole or active negligence or willful acts. This duty to indemnify, defend, and hold harmless shall survive the termination of this agreement.

14. Independent Contractor Status. It is understood and agreed that Consultant, in the performance of the Services to be performed pursuant to this Agre ement, shall act as and be an independent contractor and shall not act as an agent or employee of City. Consultant shall obtain no retirement benefits or other benefits which accru e to City’s employees and Consultant hereby expressly waives any claim it may have to any such rights. Nothing in this Agreement shall create or be construed as creating a partnership, joint ve nture or any other relationship between City and Consultant.

Page 252 of 268 ends

Initial: City______ Consultant______
6 15. Consultant’s Books and Records.

a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents ev idencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period re quired by law, from the date of fina l payment to Consultant under this Agreement.

b. Consultant shall maintain all documents and records that demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement.

c. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City. Copies of such documents shall be provided to the City for inspection at the City offices.

d. Where City has reason to believe th at such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant’s business, City may, by written request, require that custody of the records be given to the City an d that the records and documents be maintained in the City offices. Access to such records and documents shall be granted to any party authorized by Consu ltant, Consultant’s representatives, or Consultant’s successor-in- interest.

16. Interest of Consultant. Consultant and its shareholders covenants and represents that they do not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant’s Services hereunder. Consultant further covenants and represents that in the performance of the Services hereunder, to the best of its kn owledge no person having any such interest shall perform any Services under this Agreement.

Consultant is not a designated employee with in the meaning of the Political Reform Act because Consultant:

a. will conduct research and arrive at conclusions with respect to rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and

b. possesses no authorit y with respect to any City decision beyond rendition of information, advice, recommendation or counsel. FPPC Reg. Sec. 18700, et seq.

17. Professional Ability of Consultant . City has relied upon Consultant’s representations regarding its training and professional ability to perform the Services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled personnel to perform all Services under this Agreement. The primary provider of the Services called for by this Agreement shall be Melton Design Group who shall not be replaced without the written

Page 253 of 268 ends

Initial: City______ Consultant______
7 consent of the City. All work performed by Consultant under this Agreement shall be in accordance with the applicable professional standard of care and shall meet th e local professional standard of quality ordinarily to be expected of competent persons in Consultant’s field of expertise working in Kings County.

18. Compliance with Laws . Consultant shall use the pr oper standard of care in performing the Services and shall comply with all applicable federal, state and local laws, codes, ordinances and regulations in effect at the time the agreement is executed. In addition, if the request for proposal to provide professional services which are the subject of this Agreement cited any federal or state financial assistance involved in the project for which the Services are provided, the Consultant shall perform all services in accordance with all applicable federal and state laws, rates and regulations in effect at the time the agreement is executed.

19. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, and insurance which are legally required of Consultant to lawfully and competently perform the Services. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, and insurance which are legally required of Consultant to lawfully and competently perform the Services. Consultant shall maintain a City of Hanford business license.

20. Assignment and Subcontracting . The parties recognize that a substantial inducement to City for entering into this Agreement is the reputation, experience and competence of Consultant. Assignments of any or all rights, dutie s or obligations of the Consultant under this Agreement will be permitted only with the expr ess written consent of the City, which will not be unreasonably withheld. Consultant shall not subcontract any portion of the Services to be performed under this Agreement without the express written consent of the City, which will not be unreasonably withheld. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Agreement shall: (i) create any contractual relationship between City and subcontractor; (ii) create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor; (iii) or relieve Consultant of any of its obligations and responsibilities under this Agreement.

21. Attorneys’ Fees. If an action at law or in equity is necessary to enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees, costs and necessary disbursements in addition to any other reasonable relief to which he may be entitled.

With respect to any suit, action or proceeding arising out of or related to this Ag reement, or the documentation related hereto, the parties hereby submit to the jurisdiction and venue of the Superior Court for the County of Kings, State of California for any proceeding arising hereunder.

22. Sole and Only Agreement . This Agreement supers edes any and all other agreements, either oral or in writing, between the parties hereto with respect to the matters set forth herein and contains all of the covenants and agreements between the parties regarding said matters.

Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or in writing, have been made by any party or anyone acting on behalf of any party which are not embodied in this Agreement and no other agreement, statement or promise shall be valid or binding.

Page 254 of 268 ends

Initial: City______ Consultant______
8 23. Invalidity. If any provision of this Agreemen t is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions shall nevertheless continue in full force and effect without being impaired or invalidated in any way.

24. Amendment. No change, am endment or modification of this Agreement shall be valid unless the same be in writing and signed by the parties hereto.

25. Governing Law. This Agreement shall be construed and governed pursuant to the laws of the State of California.

26. Waiver. Waiver of a breach or default under this Agreement shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Agreement.

27. Mediation. The parties agree to make a good faith attempt to resolve any disputes arising out of this Agreement through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and shall divide the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS/ENDISPUTE (“JAMS”) or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators.

Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation.

28. Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or result from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

29. Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party.

30. Notice. Except as otherwise expressly pr ovided herein, any notice, consent, authorization or other communication to be given hereunder shall be in writing and shall be deemed duly given and received when delivered personally, when transmitted by facsimile or e-mail if receipt is acknowledged by the addressee, one business day after being deposited for next-day delivery with a nationally recognized overnight delivery service, or three business days after being mailed by first class mail, charges and postage prepaid, property addressed to the party to receive such notice at the last address furnished for such purpose by the pa rty to whom notice is directed and addressed as follows:

Page 255 of 268 ends

Initial: City______ Consultant______
9 Mario A. Cifuentez, II Greg Melton
City of Hanford Melton Design Group
319 N. Douty 820 Broadway St.

Hanford, CA 93230 Chico, CA 95928

IN WITNESS WHEREOF, the parties have executed this Agreement effective on the day and in the year first set forth above.

CITY

CITY OF HANFORD,
a M u n i c i p a l C o r p o r a t i o n

B y : _ _ _ _______________________________
M A R I O A . C I F U E N T E Z , I I
C i t y M a n a g e r

CONSULTANT

MELTON DESIGN GROUP

B y : _ _ _ _ _ _ _ _ _ _ _ _ _______________________

GREG MELTON
Principle Landscape Architect

Page 256 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 1 OF 11

This AGREEMENT, effective as of the 20 day of September 2023 shall be

BETWEEN the
CLIENT: CITY OF HANFORD
Brad Albert, Parks and Community Services Director
321 N. Douty Street, Suite B
Hanford, CA 93230
559-585-2527 / [email protected]

AND
CONSULTANT: MELTON DESIGN GROUP, Inc. (MDG)
Gregory Melton, President/CEO
820 Broadway Street, Chico, CA 95928
530-899-1616 / [email protected]

PROJECT: Heroes Park

PROJECT UNDERSTANDING:

The list below represents the design items we will be addressing in the scope of work and coordinated with the team. The project will take us through the conceptual design, construction documents, cost estimate and construction inspections.

Phase 1 – Primary Elements per the Grant and Outreach efforts performed by the City • Destination playground that attracts users of all ages and abilities • A 16-court tournament-ready, lighted pickleball complex with spectator area • A 3,000-5,000-capacity regional amphitheater
• A 1-mile-long perimeter-lighted multi-use path looping the complex • Fitness stations
• One lighted all-wheel skate park that accommodates skateboards, bikes and scooters, primarily focusing on street skating with some bowl features
• One dog park that is linked to the central part of the park • Reflexology and meditation trail
• One community/learning garden adjacent to Fire Station • One 18-hole disc golf course within the park open space • Two outdoor basketball and volleyball courts that may support futsal or 5-a-side soccer.

Supporting Elements for the Project:
• Parking area to support small and large events
• Two park restrooms with storage for maintenance crews • Public art installation visible to the community and representing the “Heroes” theme • ROW and sizing enhancements to Grangeville Boulevard to support the future expansion, connection to the High-Speed Train Station and future mass transit and bike circulation

LANDSCAPE ARCHITECTURAL DESIGN AGREEMENT
MELTON DESIGN GROUP, INC. and CITY OF HANFORD

Page 257 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 2 OF 11
• Street parking, sidewalks, street widening and street lighting on three public streets • Water and sewer extensions and connections

Phase 2 – Elements that will be Master Planned, but most likely not a part of Phase 1 • Multi-use fields/open space elements on the south end of the site as potential cost cutting area • Recreation Building for indoor events and receptions
• Concessioned Food and Beverage buildings to support tournaments and special events

SECTION 1 – SCOPE OF WORK
The following is an outline of the scope of work for design and submittals for the project:

TASK 1 – PROJECT MANAGEMENT and PARK PROGRAM REFINEMENT The project launch sets the tone for a successful project. The prime consultant brings the key players from each consultant and meets with the C lient’s project manager and assisting staff. We intend to meet with the City two weeks after award to describe our approach in detail and then continue with monthly or bi - monthly meetings throughout the project depending upon urgency.

1.1 Meet with the Client and Team to discuss the scope of work, design needs and specific desires for the project. Identify a key group of stakeholders to form a Project Development Team (PDT).

1.2 Create project design schedule and update throughout project for all design tasks.

1.3 Coordinate project and perform monthly meetings to assess project progress and enhance the Quality Assurance and Quality Control throughout project.

1.4 Engage with C lient Staff to refine grant program to meet budget and to assess and prioritize the needs of the community within the budget. Engage other options for funding regarding the project.

1.5 Develop enhanced program of elements and prioritize Client’s desires. • Review ideas and gain a complete understanding of the project. • Discuss all possible opportunities and study constraints directing the design.

Deliverables:
o Monthly Reports / Updated Schedule for the PDT
o Invoices at milestones for percent of completion
o Prioritized program identifying key elements within budget to identify phasing options

TASK 2 – SITE ANALYSIS, MASTER PLAN, COST DEVELOPMENT and PUBLIC OUTREACH Team MDG works with the Client, and, if needed and time allows, the Community through Outreach Events, in a collaborative process to first identify their needs and wants. We then create a prioritized program that best represents these. This phase includes multiple alternative layouts and elements to provide an engaging design process.

2.1 Refine the Park Program from City Staff and ongoing community and costs input. We will provide outreach for specific elements of the park such as the Skate Park Element. • Research other playgrounds to avoid duplicating what’s already around.

2.2 Site Visit and Analysis – Analyze site and surrounding area to confirm existing conditions. • Study all site elements using aerial view and site visit. • Study general grades to understand the elevation challenges. • Conduct research to c onfirm utilities and drainage on plans and onsite. (performed by 4Creeks)

Page 258 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 3 OF 11
 MDG and 4Creeks will coordinate directly with the utility companies to gain information.
• Identify all onsite elements that are to remain and to be removed. • Obtain all site conditions from sun, wind, views, neighbors, uses, etc.

2.3 Topographic Survey of key site areas.
• Conduct a topographic field survey, 1’ contour intervals. (performed by 4Creeks) • Identify all onsite elements that are to remain or to be removed. • Provide spot elevations.

2.4 Base Map – Use topography, aerial photos and site surveys to develop the Base Map.

2.5 Master Plan and Cost Estimate – Include design and cost alternatives and meet with Staff to review.

MDG will provide the Team with all horizontal control designs for review and adjustments. • Incorporate all elements of program into plan view schematic plan with descriptions and dimensions of all elements.
• Provide alternative options for key areas that warrant study and/or give a new look. • Develop digital and hand-drawn 3D rendering of sites. Client review of key sites with VR. • Develop Cost Estimate. Breakout costs so alternatives can be swapped in for value engineering.

2.6 Community Engagement Workshop Meetings – The City has performed outreach during the grant phase of the project. MDG will lead meetings for specific elements such as the Skate Park and Destination Playground.
• Outreach Meeting #1 – Present overall concept plan options with site layouts and elements to community. Confirm the relationships of each element. • Outreach Meeting #2 – Present specific details of elements, focusing on an all-wheel skate park and the destination playground.
• Review initial public feedback and revise plans as needed. • Outreach Meeting #3 – Present revised Master Plan based on outreach to the community to obtain any final community input.

2.7 Revise and update alternatives and present them to the City. • Meet with Client and Team to review design for conformance and make recommendations regarding engineering, LID, utilities, drainage, etc.
• Update sketches and 3D throughout Master Plan process.

2.8 Develop Preferred Alternative and Cost and present to PDT. • Assess design and phasing options and reassess prioritized elements. • Client to provide additional direction and comment.

2.9 Revise Final Schematic Master Plan Design and Cost to present and gain approval from the City. • Value engineer project while maintaining the character of the project. • Update final graphics for 3D, virtual reality flybys and plan view color.

2.10 Create a Master Plan booklet that summarizes the design process.

Deliverables:
o Prioritized Program for Public Outreach
o Schematic Designs with alternatives
o Final 11 x 17” Master Plan booklet (5 copies)
o Preliminary / Final Costs Estimate and Analysis
o In-Person and Virtual Meetings as needed.

Page 259 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 4 OF 11
TASK 3 – PLANS, SPECIFICATIONS and ESTIMATES: Refining Design We will conduct more detailed studies of the preferred design incorporating all disciplines (civil, structural and electrical), altering the concepts using different best practices, models, details and methods, to evaluate and value engineer the project whi le performing QA/QC throughout the process. We will also complete multiple phases of submittals for review at 50%, 75%, 90% and 100% of completion.

3.1 Develop a digitized final site and landscape Master Plan and 3D rendering.

3.2 Present final plan to the City and gain approval to move on to 75%, 90%, 100% Construction Drawings.

3.3 DEMOLITION PLAN – Show location of all elements that require removal and offsite disposal.

3.4 GRADING PLAN – Show location and layout of all grading, drainage and utilities. • Identify areas requiring imported soil for better drainage and plant health. • Show new drainage patterns with slopes and compaction. • Identify all landscape mounds and earth shapes.

3.5 ELECTRICAL, LIGHTING and SOLAR LIGHTING PLAN – Lighting location and fixture type. Coordinate all electrical fixtures and play and security lighting in landscape with Electrical Engineer.

3.6 STRUCTURAL DETAILS and CALCULATIONS – Necessary structural calculations for footings for walls and entry monumentation.

3.7 CONSTRUCTION/LAYOUT PLAN – Show location of all hardscape, play areas and lighting. • Identify all paving locations, types, finish and detail reference. • Locate all existing conditions to remain including utilities. • Identify all material types and installation details.

3.8 ARCHITECTURAL VISION and ELEVATIONS FOR STRUCTURES
• Provide review of design for restrooms, amphitheater bandstand and any additional items like sign structure or other modifications.
• Coordinate with prefabricated structures to ensure timely delivery.

3.9 IRRIGATION PLAN – Irrigation plan with complete water use information including all water use calculations for all planting areas.
• Identify all irrigation water use zones (trees, shrubs and ground cover) along with mainline, new and existing valves, point of connection and meters. • Show legends and identify all elements of irrigation.

WATER USE CALCULATIONS, SCHEDULING and GUIDELINES
• Provide water use calculations identifying maximum applied water allowance and water use.
• Develop water use schedule with seasonal adjustments along with estimated water use calcs.

3.10 PLANTING PLAN – Identify all plant species, water use, size and type. • Use d rought-tolerant, low -maintenance adaptive plants and California natives where possible.
• Provide all surface material, gravel, boulders, etc.

3.11 DETAIL SHEETS – Construction details of all elements.

3.12 SPECIFICATIONS – Book form to describe required materials, workmanship and grading, planting and irrigation techniques. Including requirements for contractor-supplied as-built drawings.

3.13 COST ESTIMATE – Calculations and detailed Cost Estimate to verify budget and bid documents. • Cost will be formatted to have estimate with several additional line items for alternate items.

Page 260 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 5 OF 11

3.14 SUBMITTALS – Sets of development plans for the Client; revise construction documents, as required, for approval.
• Submittal of construction drawings to Client will occur at 75%, 90% and 100%. • Submittal of Schedule A Bid Form and Schedule B for itemized elements. • If requested, incorporate specifications and bid form into the Client’s boiler plate and general conditions to form a complete bid package.

Deliverables:
o Meetings with Staff for Review and Comments
o Construction Plans, Specifications and Details:
♦ 1st Submittal – plans 50% complete, spec outline
♦ 2nd Submittal – plans 75% complete, full spec review
♦ 3rd Submittal – plans 90% complete, full spec review
♦ Final Submittal – plans 100% complete, final spec review ♦ Permits Plats, as built drawings.
o MDG Construction Drawings with all sub-consultant plans integrated o Revised Cost Estimate
o City Plan Review

TASK 4 – BID ADMINISTRATION and CONTRACT DOCUMENTS
Coordinate bid schedule with Client Staff and throughout the bid process. It’s important that Team MDG be available to walk the site with bidders, refer to RFIs and provide any additional information they need for bidding.

4.1 Bid Form development and refinement. Distribution of information to contractors by City.

4.2 Pre-Bid Meeting and Site Walk / RFIs / Addenda, if needed.

4.3 Bid Review by City and MDG. Award of contract by City.

Deliverables:
o RFIs and Addenda as needed
o Contract Documents

TASK 5 – CONSTRUCTION ADMINISTRATION SUPPORT – Team MDG includes local engineers and designers located in downtown Hanford that can be onsite for inspections and meetings.

Construction Administration is crucial to completing the project. The City and MDG can cooperate in project management and inspections throughout the construction process. There are key parts of the project that the design consultant needs to review and see.

5.1 MEETINGS – Pre-Construction and regular Progress Meetings.

5.2 SUBMITTAL REVIEWS – Team MDG will review and accept or deny required contractor submittals, cutsheets and samples for all disciplines; answer any RFIs.

5.3 SCHEDULED SITE VISITS – We feel confident that with Kyle McDonald from 4Creeks and Greg Mendonsa from Urban Tree Foundation we have ample local support to help with the administration of construction, and Greg of MDG will be on site as needed for all detailed design issues. Team MDG will participate in the following inspections: (approx. 14-20) • Grading, Utilities, Hardscape layout, Skate Park, Lighting, Irrigation, Planting, etc.  All inspections are important, but some key ones are:

Page 261 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 6 OF 11
o Soil preparation and grading inspections for all planting. o Finishes and color confirmation of materials.
o Skate Park and all concrete layouts and detail finishes. • Pre-maintenance period observation and punchlist to confirm completion. • Final walk through/post-maintenance period punchlist.

5.4 Final walk and sign off on project.

5.5 Certificate of Completion for Construction.

5.6 As-Built Record Drawings.

Deliverables:
o RFIs, Submittal Acceptance, Inspections throughout construction o Preliminary and Final Design Checklist
o As-Built Drawings – Certificate of Completion

COST SUMMARY PER TASK

TASK 1: PROJECT LAUNCH and PARK PROGRAM REFINEMENT $ 114,090 TASK 2: SITE ANALYSIS, MASTER PLAN, COST DEVELOPMENT and PUBLIC OUTREACH $ 291,410 TASK 3: PLANS, SPECIFICATIONS and ESTIMATES $ 493,350 TASK 4: BID ADMINISTRATION and CONTRACT DOCUMENTS $ 48,7400 TASK 5: CONSTRUCTION ADMINISTRATION SUPPORT $ 47,250 CONTINGENCY (only used upon written authorization) $ 50,000

TOTAL $ 1,044,840

OPTIONAL SERVICES
GEOTECHNICAL and ORNAMENTAL SOILS REPORTS (if needed) $ 8,500 CASp CERTIFIED REPORTING (if needed) $ TBD

If the project scope changes in a way that could cause additional work beyond this contract, Landscape Architect will dictate an addendum to Contract and notify Client prior to exceeding the estimate.

Reimbursable expenses are included for deliverables no ted above. Additional Services and reimbursables exceeding expectations shall be billed on an hourly rate / expense basis in accordance with MDG’s Schedule of Rates.

SECTION 2 – BASIS OF COMPENSATION

Compensation due Consultant for services described in Section 1 shall be a not to exceed fee of $1,044,840.

Charges for Services described in Section 1 shall be billed monthly in proportion to the work completed.

Client agrees to pay Consultant within thirty (30) days after the date of billing. Payments due Consultant and unpaid under this Agreement shall bear interest on the unpaid balance at a rate of 1.5% per month which is an annual percentage rate of 18%. If payment is not received within forty-five (45) days, Consultant may, at his discretion, stop work until payment is received. For Additional Services, provided under Section 3, compensation shall be on an hourly rates and expense basis in accordance with MDG’s Schedule of Rates.

Schedule of Rates to be provided at the time Additional Services are requested.

Page 262 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 7 OF 11

SECTION 3 – ADDITIONAL SERVICES

Services not described in Section 1 shall be provided if authorized in writing by Client.

Additional Services include but are not limited to:

1. Additional meeting, site visits or inspections during construction.

2. Permitting fees.

3. Construction permits will be by construction contractor.

4. Work involving environmental impact reports or initial study.

5. Civil engineering or design for off-site improvements.

6. Structural engineering reports.

7. Construction material testing such asl concrete density or soil compaction tests.

8. Work involving making or processing applications for additional permits.

9. Renderings, models, computer generated animations or other forms of presentation materials, that go beyond the stipulated plans, drawings and documents outlined in Section 1.

10. Any service or reimbursable expense not included in or in excess of Section 1 that are provided by Melton Design Group, Inc. at your request or concurrence.

SECTION 4 – EXCLUDED SERVICES

These services and estimates are available on an “as-needed/upon request" basis.

1. Boundary Survey

2. SWPPP to be performed by the Contractor

3. Environmental and CEQA Studies

4. Sub-Consultant invoices and contract payment summary will not be included with MDG billing

5. Building (recreation Center, Food/Beverage, etc.) are included for Master Planning only, not part of the Construction Documents

6. Design of the art installations

7. MDG invoices are generated electronically from bookkeeping software and, as such, do not include any signature

SECTION 5 – MISCELLANEOUS PROVISIONS

1. This proposal will remain valid for the time of 6 months, after which , if a contract has not been executed, MELTON DESIGN GROUP, INC. reserves the right to revise billing rates and fee amounts.

2. If the Client deems a delay of scheduled deliveries or other due dates is needed, the Client may do so by written notice to the Consultant . Delays of six (6) months or more will result in a fee increase of 5% every six (6) months while the project is delayed.

3. This Agreement is construed and governed by the laws of the State of California. The venue for any proceeding brought by either Party with regard to any provision or obligation arising under this Agreement shall be in the County of the filing Party.

4. This Agreement is the entire and integrated agreement between Client and MDG and supersedes all prior negotiations, statements or agreements, either written or oral. The parties may amend this Agreement only by a written instrument signed by both Client and MDG.

5. If any term or provision of this Agreement is held as a matter of law to be unenforceable or invalid for

Page 263 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 8 OF 11
any reason, the remainder of this Agreement shall continue in full force and effect and be enforceable without such provisions, and the parties agree that any unenforceable or invalid term or provision shall be amended to the minimum extent required to mak e such term or provision enforceable and valid.

6. Neither Client nor MDG shall assign this Agreement without the written consent of the other.

7. Nothing in this Agreement shall create a contractual relationship for the benefit of any third party.

8. MDG agrees to provide its professional services with its best skill and judgement in accordance with this Agreement; Federal, State and local laws and regulations and the generally accepted Standard of Care for Landscape Architects which are in effect at the time of this Agreement in all ways to further the interest of the Client and project(s). MDG shall furnish the services in an efficient manner and shall use its best efforts to see that the project is completed in conformity with the terms of this Agreement and consistent with the interest of the Client.

9. MDG shall use reasonable efforts to verify the accuracy and suitability of any drawings, plans, sketches, instructions, information, requirements, procedures, requests for action and other data supplied to MDG for the project.

10. MDG agrees that its officers and employees do not now have a conflict of interest with respect to any aspect of this Agreement and that MDG, its officers or employees, will not contract for or accept employment for the performance of any work or services with any individual business, corporation or government unit that would create a conflict of interest in the performance of services.

11. MDG shall maintain in force throughout the term of this Agreement insurance adequate by industry standards for professional liability and comprehensive general liability to insure against any claim or claims for damage arising in connection with MDG’s performance or service provided under this Agreement.

12. Irrespective of any other term in this Agreement, MDG shall not control or be responsible for construction means, methods, techniques, schedules, sequences or procedures; or for construction safety or any other related programs; or for another party’s errors or omissions or for another party’s failure to complete their work or services in accordance with MDG’s documents.

13. Both Client and MDG agree to indemnify the other Party; its officers, directors, employees and agents; defend and hold harmless from and against any and all claims, liabilities, suits, demands, losses, costs and expenses, including, but not limited to, reasonable attorneys' fees and all legal expenses and fees incurred through appeal, and all interest thereon, accruing or resulting to any and all persons, firms or any other legal entities on account of any damages or losses to property or persons, including injuries or death, or economic losses, arising out of the Project and/or this Agreement, except to the extent arising solely from the gross negligence or willful misconduct of either Party.

14. Client and MDG waive consequential damages for any claims, disputes or other matters in question arising out of or relating to this Agreement. MDG’s waiver of consequential damages, however, is contingent upon the Client requiring contractor and its subco ntractors to waive all consequential damages against MDG for claims, disputes or other matters in question arising out of or relating to the Project.

15. Neither the Client nor MDG shall have any liability for any negligent act or omission of the other, its employees, officers or agents. In no event shall either Party be liable to the other Party for indirect or consequential loss of or damage to profits, business, revenue, goodwill or anticipated savings suffered by the other Party during the term of this Agreement.

16. To the extent damages are covered by property insurance during construction, Client and MDG waive all rights against each other and against the contractors, consultants, agents and employees of the other for such damages. Client or MDG, as appropriate, shall require of the contractors, consultants,

Page 264 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 9 OF 11
agents and employees of any of them similar waivers in favor of the other parties described in this paragraph.

17. Client acknowledges and agrees that proper project maintenance is required after the Project is complete. A lack of or improper maintenance in areas such as irrigation equipment may result in damage to property or persons. Client further acknowledges and agrees that, as between the parties to this Agreement, Client is solely responsible for the results of any lack of or improper maintenance.

18. MDG shall maintain records of costs, expenses and billings pertaining to services performed under this Agreement in accordance with generally accepted accounting standards. Such records shall be available to the Client or the Client’s authorized represent ative at mutually convenient times for a period of at least three (3) years after expiration or termination of this Agreement. Client shall have the right to audit and to verify the details set forth in MDG’s billings, certificates and statements, either before or after payment. The terms of this paragraph shall survive any termination of the Agreement.

19. If either Party to this Agreement institutes a proceeding in court to enforce any provision of this Agreement, or for damages by reason of any breach of this Agreement, then the Prevailing Party will be entitled to recover from the other Party all costs of the suit, including, without limitation, court costs and such amounts as the court may award as reasonable attorney’s fees and expenses for services rendered to the Prevailing Party during the proceedings.

20. MDG shall treat any Client-supplied information or information pertaining to the Client’s business as confidential and shall not disclose any such information to others except as necessary for the performance of this Agreement or as authorized by the Client in writing.

21. This Agreement may be amended by written agreement of the Parties.

22. This Agreement may be terminated by either party with or without cause, provided the other party is given not less than five calendar (5) days’ written notice of intent to terminate (delivered by certified mail, return receipt requested). Client shall pay MDG the reasonable value of services rendered by MDG or MDG sub-consultants prior to termination.

23. Landscape Architects are regulated by the State of California. Any questions concerning a Landscape Architect may be referred to:

Landscape Architects Technical Committee
2420 Del Paso Road, Suite 105, Sacramento, CA 95834. (916) 575-7230

Let us know if you have any questions concerning this proposal. If the above meets your approval, please sign and return a copy.

Sincerely,

Greg Melton, President / CEO
Principal Landscape Architect RLA #4217
Melton Design Group, Inc.

Page 265 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 10 OF 11

2023 SCHEDULE OF RATES

MDG PERSONNEL

Principal Landscape Architect $195.00 / hour
Project Manager $155.00 / hour
Irrigation Specialist $140.00 / hour
Graphic Designer $125.00 / hour
Designer/Technician $105.00 / hour
Administration $ 90.00 / hour

REIMBURSABLE EXPENSES

B & W Copies, 8.5 X 11 $ .35 each
B & W Copies, 11 X 17 $ .60 each
Color Copies 8.5 x 11 $ 1.40 each
Color Copies 11 X 17 $ 2.65 each
Binding Covers 8.5 x 11 $ 3.00 each
Binding Covers 11 x 17 $ 6.00 each
Black & White 24x36 Print $ 5.75 each
Black & White 30x42 Print $ 8.25 each
Color 24x36 Print $30.50 each
Color 30x42 Print $45.00 each
Premium Color Glossy Plan Print $65.00 each
Foam Core 24” x 36” $13.50 each
Foam Core 30” x 42” $16.00 each
Flash Drive $ 10.00 each
Overnight Mail Cost Plus 15%
Courier Cost Plus 15%
Photography Cost Plus 15%
Soils Analysis Cost Plus 15%
Travel / Automobile $ .75 per mile

Note: Rates subject to change after one year of proposal

Page 266 of 268 ends

Heroes Park
MDG Project No: 2585
9/20/2023

820 BROADWAY ST CHICO CA 95928 * 530.899.1616 / 916.754.2153 * MELTONDG.COM

PAGE 11 OF 11
I hereby authorize Melton Design Group, Inc. to proceed with the work as set forth in this contract.

Date:_____________ By:

Print Name:

Title:

Company:

CONTACT INFO and EMAIL ADDRESS WHERE BILLINGS ARE TO BE SENT:

Print Name and Title:

Company Project # or Reference Name:

Phone #: Email:

Mailing Address:

State / Zip Code:

If more than one recipient for billings, please add Email below.

Email: ________________________________

All checks are to be mailed to: Melton Design Group, Inc. 820 Broadway Street
Chico, CA 95928

Billing Questions: Teresa Walsh, Controller
(530) 899-1616, [email protected]

Page 267 of 268 ends

Council Future Agenda Items
Originated
Date Item Originator Staff Lead Date Estimate
5/16/2023 Municipal Code Amendments to the
Cannabis Tax Structure for non-retail
businesses and the Application Process
Community
Development
Jason Waters 11/7/2023
8/15/2023 Presentation to Council and review of
measures that the City can take to
improve the City’s financial position.

Council
Consensus
Various Staff 11/7/2023
8/15/2023 Municipal Code Amendments to
modify the chapter related to murals
and consider and adopt a policy to
approve murals at the administrative
level.

Council
Direction
Jason Waters 11/7/2023
9/19/2023 Presentation of the final
recommendations for the Utility Rate
Study.

Council
Direction
Chris Tavarez 11/21/2023

Page 268 of 268 ends
← All documents from this meeting