Cities Index.
Agenda packet

Hanford City Council
October 20, 2026

Document
Agenda packet
Meeting
October 20, 2026
Body
Hanford City Council
Pages
444
Original file
34.2 MB
Text extracted from the city's file for reading and search. Open the original on hanfordca.api.civicclerk.com. That file is the official record.

Acceptance of the vehicle is contingent on final 'wet testing' of the vehicle.

For the reasons above, staff are confident the fuel tanker vehicle from World Fuel Services will meet the needs of the Hanford Municipal Airport's new fuel island and will be a reliable unit without the cost of purchasing a new fuel tanker vehicle.

FISCAL IMPACT:

Council approved an appropriation of $370,000 for the purchase of a jet fuel tanker trunk as part of the Airport Fueling Island Project (11102021-826327). The proposed jet fuel tanker truck cost is under budget at a purchase price of $191,440.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. World Fuel Services Used Vehicle Quote

2. Third Party Evaluation - World Fuel Services

3. Garsite Used Vehicle Quote

Page 213 of 444 ends

4. SkyMark Refuelers Used Vehicle Quote

5. Fresno Truck Center New Vehicle Quote 1

6. Fresno Truck Center New Vehicle Quote 2

Page 214 of 444 ends

World Fuel Services Date 10/13/2026
One Mill Street Parish, NY 13131 Quotation # cpm1
800-272-3681 Fax: 315-625-7371 Customer ID WKDVLLNK5H45 Quotation For
City of Hanford Quotation valid until: 11/12/2026
Prepared by: cmusco
Quantity Description Unit Price Taxable? Amount
1 55787 2017 5k $ 174,250.00 Yes $ 174,250.00
1 Freight in $ 2,600.00 Yes $ 2,600.00
1 No
$ - No $ -
$ - No $ -
Subtotal $ 176,850.00
If you have any questions concerning this quotation, please contact: Tax Rate 8.25% Janis Gauthier [email protected] Sales Tax $ 14,590.13 Freight o
Thank you for your business! TOTAL $ 191,440.13
City of Hanford
80NSSC2693525Q-1

Page 215 of 444 ends

630 S. Horsebarn Rd
Rogers, AR 72758
818-524-9410
[email protected]
Subject: Hanford Municipal Airport Jet A Refueler Inspection.

The purpose of this report is to assess current condition of (1) 2016 International Navistar Refueler (No Warranty) 5k gallon fueling tank. Cummins engine (Allison automatic transmission).

Details:
• 4947 miles
• 4141 engine hours
• 1361 PTO hours
• Very clean inside tank
• Very clean truck
• Air compressor ran (0 psi to 120 psi 3 minutes 40 seconds), solid pressure up timeline • All new fueling hoses
• Nozzles clean and in good condition
• Hose reels (Hannay) good working condition
• Hose reel motors good working condition
• All filters on drive train and fueling system recently serviced in March 2026

Page 216 of 444 ends

Immediate Follow Up Items:
• New tires all around (6) due to weather cracking (approximately $300-$600 each) • Driver side rear axle seal leak repaired (approximately 4 man hours minimum, plus parts) • Front steering components leaking and over greased (approximately 4 man hours minimum, plus parts)
• PTO seal leaking (approximately 12-16 man hours, plus parts) • Oil pan or rear main seal appears to be leaking (TBD) • Tank was empty, unable to wet test functionality of fueling system, internal valve, PTO, pump, etc. Would make purchase contingency the ability to wet test prior to closing. • Air system leaking down at approximately 5 psi every 10 minutes (Time and materials to track leak, probably 4 hour minimum, plus parts)
Summary
This truck seems a good value since the estimated repair costs would not exceed the cost of buying new. However, with no way to test the actual fueling system at time of inspection we suggest making it a contingency to see it take fuel and dispense fuel before closing.

Refuelers, by nature, idle a lot in their lifetimes. Something to be aware on this unit is the idle hours are very close to its miles. Trucks equipped with new emission that idle frequently could develop trouble with their EGR, EGR Cooling Systems which may lead to valve issues. At this time there is no reason to believe this engine has issues based on what can be observed. Since this could be the same scenario with a new truck, this is purely informational.

Advantages to purchasing new would be a warranty, longer life span on unit. Otherwise, this unit seems to be capable of fitting Hanford Municipal’s refueler needs for a good value. Repairs suggested are the result of normal wear and tear and do not seem to be a result of poor maintenance or hard operations.

Page 217 of 444 ends
Page 218 of 444 ends
Page 219 of 444 ends
Page 220 of 444 ends
Page 221 of 444 ends
Page 222 of 444 ends
Page 223 of 444 ends
Page 224 of 444 ends
Page 225 of 444 ends

12.D.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: CONSENT CALENDAR SUBJECT:

Award of a contract to Mattos Underground Construction Inc, of Laton, CA, in the amount of $48,879.55, for the Courthouse Water Service Separation Project, and appropriate $48,879.55, from the Accumulated Capital Outlay (ACO) Fund (0004), to be reimbursed $6,315 from Esteem Land Co, the owner of the Courthouse.

RECOMMENDATION:

Recommendation: It is recommended that the City Council, by motion, authorize the City Manager to award a contract to Mattos Underground Construction Inc, of Laton, CA, in the amount of $48,879.55, for the Courthouse Water Service Separation Project, and appropriate $48,879.55 from the Acumulated Capital Outlay (ACO) Fund (0004), to be reimbursed $6,315 from Esteem Land Co, the owner of the Courthouse.

Recommended Motion: I move to authorize the City Manager to award a contract to Mattos Underground Construction Inc, of Laton, CA, in the amount of $48,879.55, for the Courthouse Water Service Separation Project, and appropriate $48,879.55 from the Acumulated Capital Outlay (ACO) Fund (0004), to be reimbursed $6,315 from Esteem Land Co, the owner of the Courthouse.

BACKGROUND:

The Old Kings County Courthouse is a downtown landmark located in Civic Park. The building was constructed in 1896-1897 after Kings County split from Tulare County and served as the county courthouse until 1977. The building was saved from demolition by the City of Hanford in the late 70’s and placed on the National Register of Historic Places in 1978. The building has been maintained by the City over the last several decades, primarily as rentable commercial space and was recently sold to Esteemed Land Company in 2024.

With the sale of the Old Kings County Courthouse, the City began the process of separating utilities, landscape, and other common areas. The second utility that requires a separation project are the water services that serve the Courthouse, Old Kings County Jail (The Bastille), and park landscape.

To complete the project, three new water services will need to be installed. Currently, there are two water services. One of these services supplies water for the Courthouse building, Bastille, and park restrooms. The second water service supplies water for the park landscape and turf. The additional water services will separate the park restrooms and Bastille from the Courthouse and the second will supply the west side of the park. Esteem Land Company will fund the third water service for the landscape on the Southside of the Courthouse that was included in the sale of the building.

Page 226 of 444 ends

Staff have performed site inspections to determine the best placement for the additional water services and determine the most efficient location of the existing water main to be used. Staff also met onsite with Mattos Underground Construction Inc. because of their knowledge of the utility infrastructure in the area and the process to install the water services. Staff are requesting that Mattos Underground Construction Inc be used as a sole source vendor because of their knowledge of the downtown infrastructure and ability to complete the project. Mattos Underground is available to complete the project in less than one week, once awarded. This would reduce the impact on the park, eliminating scheduling conflicts with special events and completion before the start of Winter Wonderland. Staff also reviewed the cost estimate provided by Mattos Underground and the estimate is inline with competitive bids from other recent projects of like scope.

This is considered a Public Works contract and, therefore, is subject to State of California prevailing wages, registration with the Department of Industrial Relations and submission of certified payroll to the Labor Commissioner, as well as other requirements outlined in the City’s Labor Compliance Manual.

FISCAL IMPACT:

Staff is requesting an appropriation of $48,879.55 from the Accumulated Capital Outlay (ACO) Fund for the completion of the Courthouse Water Service Separation Project. Esteem Land Company will reimburse the City in the amount of $6,315 for the installation of a 1" water service. The reimbursement will be returned to the ACO Fund.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Mattos Underground Construction Inc. Cost Estimate

2. Couurthouse Water Service Site Map

Page 227 of 444 ends

Date
9/4/2026
Estimate #
1683
Name / Address
City Of Hanford
Mattos Underground
819 E. Wood Ave
Laton, CA 93242
P.O. No.

Project
Total
Signature of Acceptance:

Print Name:

Date of Acceptance:
*Due To Fluctuation Of Material Costs & Availability, Material Manufacturers & Suppliers Will Only Honor Quotes For Twenty Four (24) Hours, Mattos Underground Construction Proposals Will Be Adjusted Accordingly To Current Market Prices At Time Of Material Shipment*
CSLB #607408
**If Hazardous Waste Is Encountered, Mattos Underground Construction Will Notify The Customer, The General Contractor And The Property Owner. Once Notified, The Customer, The General Contractor And The Property Owner Will Assume The Liability & Fees Associated With The Proper Removal And Disposal Of The Hazardous Material Encountered** Description Qty Rate Total
Water Service Installation - South Of Carousel On W. 8th St. - No Plans Provided - Job Walk With City Of Hanford Staff - Prevailing Wages Includes
Equipment, Material And Labor To Include:

USA Work Area
Worker Protection As Needed
City Of Hanford NO FEE Encroachment Permit
One (1) - Mobilization
- 1" & 2" Water Service Installation -
*City Of Hanford To Provide, Set Up, Maintain And Remove Traffic Control*
Sawcut, Removal And Disposal Of Existing Asphalt, Expose Existing Water Main
Install One (1) - 1" And One (1) - 2" Tapping Saddles, Provide One (1) - 1" And One (1) - 2" Hot Tap
Trench And Install One (1) - 1" And One (1) - 2" Water Service Per City Of Hanford Specifications - Includes: Service Poly, Meter Box/Lid To Grade, Meter Spacer (LESS METER) And Stub Out Of Box To Grass Area
Backfill, Compact And Clean Up Work Area
City Of Hanford To Provide Temporary Asphalt For Patch And Restore Roadway With Hot Mix Asphalt
Place And Finish Concrete Sidewalk - *Water Service Alignment Only*
Equipment & Labor 1 14,669.62 14,669.62
Material 1 4,362.55 4,362.55
- 1" & 2" Backflow's -
Connect To Proposed Stub Out Of Meter Box
Install One (1) - 1" And One (1) - 2" Backflow Prevention Device - Includes: Backflow Devices To Grade, Protective Enclosures, Insulation Blankets, Concrete Pad, Stub Out From Pad For Connection By Others And Certification
Equipment & Labor 1 3,301.94 3,301.94
Material 1 5,262.93 5,262.93

Page 1 ends
Page 228 of 444 ends

Date
9/4/2026
Estimate #
1683
Name / Address
City Of Hanford
Mattos Underground
819 E. Wood Ave
Laton, CA 93242
P.O. No.

Project
Total
Signature of Acceptance:

Print Name:

Date of Acceptance:
*Due To Fluctuation Of Material Costs & Availability, Material Manufacturers & Suppliers Will Only Honor Quotes For Twenty Four (24) Hours, Mattos Underground Construction Proposals Will Be Adjusted Accordingly To Current Market Prices At Time Of Material Shipment*
CSLB #607408
**If Hazardous Waste Is Encountered, Mattos Underground Construction Will Notify The Customer, The General Contractor And The Property Owner. Once Notified, The Customer, The General Contractor And The Property Owner Will Assume The Liability & Fees Associated With The Proper Removal And Disposal Of The Hazardous Material Encountered** Description Qty Rate Total
- IRWIN ST SIDE -
- 2" Water Service Installation -
*City Of Hanford To Provide, Set Up, Maintain And Remove Traffic Control*
Sawcut, Removal And Disposal Of Existing Asphalt, Expose Existing Water Main
Install One (1) - 2" Tapping Saddle, Provide One (1) - 2" Hot Tap Trench And Install One (1) - 2" Water Service Per City Of Hanford Specifications - Includes: Service Poly, Meter Box/Lid To Grade, Meter Spacer (LESS METER) And Stub Out Of Box To Grass Area Backfill, Compact And Clean Up Work Area
City Of Hanford To Provide Temporary Asphalt For Patch And Restore Roadway With Hot Mix Asphalt
Place And Finish Concrete Sidewalk - *Water Service Alignment Only*
Equipment & Labor 1 12,018.81 12,018.81
Material 1 3,175.77 3,175.77
- 2" Backflow -
Connect To Proposed Stub Out Of Meter Box
Install One (1) - 2" Backflow Prevention Device - Includes:

Backflow Device To Grade, Protective Enclosure, Insulation Blanket, Concrete Pad, Stub Out From Pad For Connection By Others And Certification
Equipment & Labor 1 3,071.94 3,071.94
Material 1 3,015.99 3,015.99

Page 2 ends
Page 229 of 444 ends

Date
9/4/2026
Estimate #
1683
Name / Address
City Of Hanford
Mattos Underground
819 E. Wood Ave
Laton, CA 93242
P.O. No.

Project
Total
Signature of Acceptance:

Print Name:

Date of Acceptance:
*Due To Fluctuation Of Material Costs & Availability, Material Manufacturers & Suppliers Will Only Honor Quotes For Twenty Four (24) Hours, Mattos Underground Construction Proposals Will Be Adjusted Accordingly To Current Market Prices At Time Of Material Shipment*
CSLB #607408
**If Hazardous Waste Is Encountered, Mattos Underground Construction Will Notify The Customer, The General Contractor And The Property Owner. Once Notified, The Customer, The General Contractor And The Property Owner Will Assume The Liability & Fees Associated With The Proper Removal And Disposal Of The Hazardous Material Encountered** Description Qty Rate Total
EXCLUSIONS: Permits/Fees Associated With, Building
Permit/Application/Fees Associated With, Bonds, Inspection Fees, Engineering, Construction Staking, Construction Water,
Construction Trash/Dump Fees, Construction Fencing, Construction Toilet Facilities, Damage To Any Unmarked Utilities, Relocation Of Existing Utilities In Conflict With New Installation, Offsets In New Piping To Clear Existing Utilities, Hazardous Waste
Removal/Disposal/Fees Associated With, Connection/Impact Fees, Water Meters, Traffic Control Plan/Equipment/Fees Associated With, Final Pavement Restoration, SWPPP, Soil
Import/Export/Fees Associated With, Slurry Backfill, Chlorination Of Newly Installed/Existing Water Lines, Flushing/Fees Associated With, Landscape Removal/Replacement/Fees Associated With, Asphalt/Concrete Striping/Markings, Special Coatings, Additional Insurance Requirements Beyond Mattos Underground
Construction's Current Policies, Night/Weekend/Overtime Work/Charges, Onsite Trenching/Piping/Connections,
Abandonment Of Existing Utilities/Water Lines, ADA Concrete Improvements, Water Shut Down Notifications/Fees Associated With And Compaction Testing

Page 3 ends

$48,879.55

Page 230 of 444 ends

City Water
Main
8” A.C.

Proposed 2“ & 1”
Backflow/Water
Irrigation Services
Proposed 2“
Backflow/Water
Service
Restroom/Bastille
Existing
Backflows

Page 231 of 444 ends

12.E.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: CONSENT CALENDAR SUBJECT:

Adopt Resolution 26-72-R, Awarding a Professional Services Agreement to A&M Consulting Engineers, Inc. of Visalia, CA for Interim City Engineer and Municipal Engineering Services for a TwoYear Term for a total Amount Not to Exceed $360,000, to be offset by salary savings and allocated to CIP projects and Authorizing the City Manager to Execute the Agreement RECOMMENDATION:

Recommendation:

1. That the City Council, by motion, adopt Resolution 26-72-R awarding a sole source Professional Services Agreement to A&M Consulting Engineers, Inc. for Interim City Engineer and Municipal Engineering Services for a two-year term in an amount not to exceed $360,000, to be offset by salary savings and allocated to CIP projects, with an option to extend services as needed; designating A&M Consulting Engineers, Inc. to perform the duties of City Engineer until the City Engineer position is filled, and authorizing the City Manager to execute the Agreement.

Recommended Motion:

1. I move to adopt Resolution 26-72-R awarding a sole source Professional Services Agreement to A&M Consulting Engineers, Inc. for Interim City Engineer and Municipal Engineering Services for a two-year term in an amount not to exceed $360,000, to be offset by salary savings and allocated to CIP projects, and authorizing the City Manager to execute the Agreement.

BACKGROUND:

CITY ENGINEER VACANCY
The City Engineer is the licensed civil engineer responsible for the engineering functions of the Utilities and Engineering Department, including approval of plans, maps, encroachment and utility permits, interpretation of the City’s engineering standards, and oversight of the City’s capital improvement and development engineering program. The budgeted City Engineer classification is

Page 232 of 444 ends

currently vacant, and the City is recruiting to fill it. The Department cannot pause the capital program during the recruitment. The Department is presently carrying a program with near-term, grant driven funding and delivery deadlines, including but not limited to:
• 10th Avenue Full Depth Reclamation, State Route 43 to Fargo Avenue – approximately $2.88 million, Measure H funded; design to be completed by early spring 2027 for construction in late spring or early summer 2027, with an ongoing obligation to demonstrate forward progress on Measure H funds.
• Heroes Park Phase I Improvements and offsites – approximately $10 million in Proposition 68 grant and local funds, with a critical grant deadline and a requested extension pending.
• Garner Avenue / Goleta Avenue Realignment – approximately $700,000, including a Measure H component.
• Water Well and Tank Design – design underway, with State Water Resources Control Board coordination and construction funding not yet fully identified. • Lacey Boulevard Complete Streets and the RAISE-funded China Alley / Paseo Project – federally funded projects requiring continuous City oversight of consultant schedules and Caltrans Local Assistance milestones.
• Annual NPDES MS4 Permit Filing – due mid-October 2026, together with two to three additional Measure H roadway rehabilitation projects, a speed study, and; • Requests for Proposals for the Intelligent Transportation System strategic plan, wastewater CCTV and cleaning services, water and wastewater pipeline improvements, and wastewater lift station maintenance.
• Private Development Engineering Services
An interruption in engineering oversight during the recruitment period would put grant schedules, reimbursement eligibility, and construction windows at risk.

STATEMENT OF QUALIFICATIONS AND INTERIM TASK ORDER
On June 8, 2026, A&M Consulting Engineers, Inc. (A&M), a Visalia-based California corporation, submitted a Statement of Qualifications for On-Call Staff Augmentation for Project Management Services to the Department. A&M provides City Engineer and on-call municipal engineering services to public agencies throughout the Central Valley, including Lemoore, Corcoran, Avenal, Parlier, Exeter, Visalia, and Selma.

The firm’s personnel include licensed civil engineers, a licensed land surveyor, and construction management staff experienced in Caltrans Local Assistance Procedures Manual requirements, grant compliance, utility and right-of-way coordination, and project controls. The Department reviewed the submittal, including key personnel, licensure, insurance coverage, conflict-of-interest disclosure, and litigation history, and found A&M qualified to perform the services.

On August 10, 2026, the Department met with A&M to scope the capital program and the interim City Engineer need. On August 11, 2026, the Department issued a Sole Source Justification under Purchasing Policy Sections D.1, E.5, and E.8, and on September 1, 2026, the City executed Task Order No. 1 with A&M for Contract City Engineer and Municipal Engineering Services on a time-andmaterials basis at a not-to-exceed amount of $49,999.00. The Task Order was approved by the City Manager within his purchasing authority under Purchasing Policy Section A.5, incorporated City Attorney and Human Resources comments received August 29, 2026, and was issued under

Page 233 of 444 ends

Purchase Order No. 22700383 dated September 2, 2026. Task Order No. 1 is expressly a stop-gap measure: its term runs through October 31, 2026, or until formal procurement of continuing services is finalized, whichever occurs first, and amounts paid under it are to be credited against the successor agreement so that the City does not pay twice for the same scope.

A&M has been performing under Task Order No. 1 since September 1, 2026, and is currently carrying the City Engineer function, the capital project oversight assignments listed above, and the NPDES permit filing. The Task Order was sized to bridge the period to the first available City Council meeting; it was not sized to carry the City through a recruitment, and Purchasing Policy Section F.2.D does not permit successive authorizations to be issued below the Council threshold to avoid Council review. The proposed Agreement is the successor agreement contemplated by the Task Order.

PROPOSED AGREEMENT
The proposed Professional Services Agreement carries forward the scope and structure of Task Order No. 1 and resolves the items the Task Order deferred to Council action. Its principal terms are:

1. Scope. (a) City Engineer services to provide critical leadership and coordination for the engineering division, plan, map, and permit review and approval, interpretation of engineering standards, engineering determinations, staff reports and Council presentations, and coordination with outside agencies, utilities, and consultants; (b) project management and oversight of assigned capital projects, including consultant design oversight, funding-agency coordination, and independent senior-level QA/QC; and (c) design services and construction management and inspection services on an as-requested basis, each authorized in writing by the Utilities and Engineering Director with an estimate of cost and remaining-budget impact before the assignment begins.

2. Term. Two years from execution, or until the City Engineer position is filled and the City provides written notice that the services are no longer required, whichever occurs first.

Either party may terminate the Agreement on thirty (30) days’ written notice, and the City pays only for services satisfactorily performed through the termination date. The Agreement is structured to remain in place through the recruitment and an orderly transition to the incoming City Engineer. However, project management services may be extended, as an option, based on workload demand at that time.

3. Compensation. Time and materials in accordance with the A&M 2026 Hourly Rate Schedule (Exhibit A to the Agreement), not to exceed $360,000 over the two-year term, inclusive of reimbursable expenses. Services performed in the City Engineer role are billed at the Professional Engineer 3 rate of $185.00 per hour; rates are inclusive of vehicle mileage, and reimbursable expenses, subconsultant procurement, materials, and printing are billed at cost times 1.10. The Department expects approximately 85 percent of the budget to be expended on senior professional engineering effort and approximately 15 percent on assistant engineer and construction administrator support and reimbursable.

The City incurs cost only for services actually rendered, and amounts paid under Task Order No. 1 are credited against the Agreement ceiling. Annual rate adjustments are subject to prior written approval of the Utilities and Engineering Director and may not increase the not-to-exceed amount.

4. Designation of City Engineer and delegated authority. The Resolution designates A&M to perform the duties of City Engineer and authorizes the Utilities and Engineering Director to confer on A&M’s designated California-licensed civil engineer, Diego Corvera, P.E. (License No. C85615), the signature and approval authority attaching to that office, including authority to sign maps, plans, permits, and certifications requiring the City

Page 234 of 444 ends

Engineer’s signature. A&M shall designate one alternate licensed engineer, subject to the Director’s written concurrence. The designated individual and alternate file Statements of Economic Interests under the City’s Conflict of Interest Code and Government Code Section 82019, and are identified in all correspondence as performing City Engineer duties on behalf of A&M Consulting Engineers, Inc.

5. Relationship of the parties. A&M is an independent contractor. The City contracts with the firm, not with any individual; A&M is solely responsible for staffing, supervising, compensating, and evaluating its personnel, and no A&M personnel are appointed to, placed in, or compensated through the City Engineer classification or carried on the City’s payroll, salary schedule, or position control roster. A&M personnel are not eligible for enrollment in the California Public Employees’ Retirement System (CalPERS) or any other benefit of City employment. A&M indemnifies the City against any claim, assessment, contribution, or penalty asserted by CalPERS, the Internal Revenue Service, or the Employment Development Department arising from a contention that A&M personnel are or were common law employees of the City, and maintains professional liability, commercial general liability, automobile liability, and workers’ compensation coverage naming the City as additional insured. The budgeted City Engineer classification remains vacant during the term of the Agreement.

6. City systems and records. Records created in performing the services are City records subject to the Public Records Act and the City’s retention schedule. A&M personnel may be provisioned City network, email, and system access as contractor accounts under the City’s information technology policies, limited to what the assigned services require and revoked upon expiration or termination of the Agreement.

7. Funding limitation. All services under the Agreement are billed to and reimbursed from local funds. A&M may provide City Engineer and project oversight services on federally funded projects, including the Lacey Boulevard Complete Streets Project and the RAISEfunded China Alley / Paseo Project, provided that time is charged to local funds and is not submitted for federal reimbursement. Consultant services billed to federal participation require prior Caltrans approval and a federally compliant, qualifications-based procurement under 23 U.S.C. 112(b)(2), 2 CFR 200.320, and the Caltrans Local Assistance Procedures Manual; the Agreement does not authorize federal reimbursement of A&M’s services.

SOLE SOURCE FINDINGS
The proposed Agreement exceeds $50,000 and therefore requires City Council approval under Purchasing Policy Section A.5. Purchasing Policy Section E.8 requires that sole source purchases be well documented and that the appropriate department verify that a good faith search for alternatives has been made. Government Code Section 37103 authorizes the City to contract with a specially trained and experienced firm for special services and advice in engineering matters. Staff recommends a sole source award to A&M, rather than a new competitive solicitation, on the following basis:

1. Continuity of the City Engineer function. A&M is presently performing the City Engineer function under Task Order No. 1 and is familiar with the status, funding source, schedule constraints, and outstanding issues on each project in the Department’s capital program.

Replacing the firm mid-recruitment would require a ramp-up period the Department cannot absorb without placing grant deadlines and construction windows at risk.

2. Qualifications matched to the need. A&M’s June 8, 2026 Statement of Qualifications demonstrates the combination of City Engineer experience, capital project management

Page 235 of 444 ends

across multiple state and local funding programs, and Caltrans Local Assistance familiarity that the role requires, consistent with the demonstrated competence and professional qualifications standard of Government Code Section 4526.

3. Good faith search for alternatives. The Department previously requested staff augmentation services from other local engineering firms, and none was able to provide the combination of interim City Engineer capacity, project management across an active multi-funding capital program, and availability on the timeline the Department requires.

Several engineering firms presently under contract with the City are the design consultants of record on the projects that would be subject to this oversight; assigning oversight of a project to its own designer would create a review-of-own-work condition and is an independent basis for excluding those firms.

4. Time is of the Essence. Services by A&M will be of a limited duration. Due to the current project workload in combination with the various demands on the City Engineer, time is of the essence to provide an interim solution using qualified and accomplished staff.The services are needed for the duration of the recruitment and transition, which is uncertain.

Conducting a separate competitive solicitation for an interim role would consume staff time and calendar without producing an available consultant on the Department’s timeline, and the Agreement terminates on notice once the position is filled. However, project management services can be extended (as an option) based on project workload.

5. Price reasonableness. Compensation is time and materials against A&M’s published 2026 Hourly Rate Schedule with no premium, escalation, or minimum applied, subject to a hard not-to-exceed ceiling. The Department finds the rates consistent with prevailing Central Valley municipal engineering consultant rates and reasonable relative to the fully burdened cost of the City Engineer classification over the equivalent period.

ENVIRONMENTAL REVIEW
Award of a professional services agreement for engineering and administrative services is not a project under the California Environmental Quality Act (CEQA Guidelines Section 15378(b)(5)) because it is an organizational or administrative activity of government that will not result in direct or indirect physical changes in the environment. Individual capital projects overseen under the Agreement are subject to their own environmental review.

RECOMMENDATION
The City Council may award the Agreement as proposed, award it with modifications, or decline the award and direct staff to conduct a competitive solicitation, in which case Task Order No. 1 expires October 31, 2026 and the City Engineer function would be uncovered during the solicitation.

Based on the above, Staff recommends that the City Council adopt Resolution 26-72-R awarding a sole source Professional Services Agreement to A&M Consulting Engineers, Inc. for Interim City Engineer and Municipal Engineering Services for a two-year term in an amount not to exceed $360,000, designating A&M to perform the duties of City Engineer until the position is filled, and authorizing the City Manager to execute the Agreement in a form approved by the City Attorney.

FISCAL IMPACT:

The Agreement is time and materials with a not-to-exceed amount of $360,000 over the two-year term, or approximately $180,000 per fiscal year, and is billed to and reimbursed from local funds.

Page 236 of 444 ends

The City incurs cost only for services actually rendered, and the $49,999.00 authorized under Task Order No. 1 (Purchase Order No. 22700383) is credited against the ceiling.

Funding for this work will be charged against City Engineer Salary Savings and/or the respective Project Funds being worked on.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Task Order 1 - Interim City Engineer & Staff Augmentation Services

2. A&M Consulting Engineers - SOQ City of Hanford On-Call Staff Augmentation

3. A&M Consulting Engineers Schedule of Fees

4. Resolution 26-72-R A&M Consulting Engineers

Page 237 of 444 ends
Page 238 of 444 ends
Page 239 of 444 ends
Page 240 of 444 ends
Page 241 of 444 ends
Page 242 of 444 ends
Page 243 of 444 ends
Page 244 of 444 ends
Page 245 of 444 ends

Municipal Engineering • Task Order No. 1 City of Hanford — Contract City Engineering Services ISSUED FOR CITY EXECUTION No. 1 of 2 Page 8

10. Acceptance
The undersigned, by signature below, authorize the services described in this Task Order at a total not-to-exceed amount of $49,999.00, time and materials.

A&M CONSULTING ENGINEERS, INC.

Orfil Muniz, P.E. / CFO Date

CITY OF HANFORD
Recommended by: Frank Senteno, PE — Utilities and Engineering Director Date Approved by: Chris Tavarez — City Manager Date

11. Engineer of Record
Engineering services under this Task Order are performed by or under the responsible charge of a civil engineer licensed in the State of California and employed by A&M Consulting Engineers, Inc.

Signature Date
Diego Corvera P.E.

A&M Consulting Engineers, Inc.

California Civil Engineer License No. 85615
9-1-2026
09/01/2026 Refer to signatures Refer to signatures Page 246 of 444 A-1
A&M Consulting Engineers
EXHIBIT “A”
2026 HOURLY RATE SCHEDULE

CLASSIFICATION RATE
Principal ................................................................................................................ $200.00/Hour Grant Writer.......................................................................................................... $130.00/Hour Professional Engineer 3 ........................................................................................ $185.00/Hour Professional Engineer 2 ........................................................................................ $175.00/Hour Professional Engineer 1 ........................................................................................ $165.00/Hour Assistant Engineer 3 ............................................................................................. $140.00/Hour Assistant Engineer 2 ............................................................................................. $135.00/Hour Assistant Engineer 1 ............................................................................................. $120.00/Hour Professional Land Surveyor 2 ............................................................................... $180.00/Hour Professional Land Surveyor 1 ............................................................................... $175.00/Hour Assistant Land Surveyor....................................................................................... $145.00/Hour Environmental Consultant .................................................................................... $170.00/Hour Environmental, Health & Safety Officer .............................................................. $150.00/Hour Construction Engineer........................................................................................... $165.00/Hour Construction Observer ......................................................................................... $155.00/Hour Construction Administrator .................................................................................. $110.00/Hour Technical Assistance............................................................................................. $140.00/Hour Engineering Aide .................................................................................................. $110.00/Hour Survey Party Mobilization .................................................................................... $100.00/Hour 1-Man Survey Party .............................................................................................. $180.00/Hour 2-Man Survey Party .............................................................................................. $250.00/Hour 3-Man Survey Party .............................................................................................. $350.00/Hour LiDAR Scanner ..................................................................................................... $200.00/Hour Equipment Rental and Associated Expense .............................................................. Cost x 1.10 Materials, Printing, Subconsultant Procurement ....................................................... Cost x 1.10 Mileage ....................................................................................................... @ Current IRS Rate Note: A&M Consulting Engineers General Engineering Fee Schedule rates are subject to adjustment annually. Survey party and construction inspector rates are also subject to adjustment upon change in “Prevailing Rate” as determined by the Director of Industrial Relations, State of California. Fees include vehicle mileage unless specified.

Page 247 of 444 ends

June 8, 2026
Statement of Qualifications for On-Call Staff Augmentation for Project Management Services for the City of Hanford.

Primary Contact
Diego Corvera, PE, LCI
Project Manager
[email protected]
608 E. Center Ave
Visalia, CA 93292
P: 559.429.4747
am-engr.com
A&M
Consulting Engineers

Page 248 of 444 ends

Table of Contents

1. Introductory Letter
Introductory Letter

2. Consultant Information
Consultant Information

3. Scope of Work
Scope of Work

4. Approach
Approach

5. Experience
Experience
Appendix A
Full Team Resumes

Page 3 ends
Page 4 ends
Page 12 ends
Page 8 ends
Page 6 ends
Page 22 ends

Image imported from https://www.ci.hanford.ca.us/

Page 249 of 444 ends

1. Introductory Letter
June 8, 2026
City of Hanford
Department of Public Works
900 S 10th Ave
Hanford, CA 93230
Dear Mr. Senteno,
On behalf of A&M Consulting Engineers, I am pleased to submit our Statement of Qualifications to the City of Hanford for Qualifications for On-Call Staff Augmentation for Project Management Services.

A&M understands the City may be seeking staff augmentation to support project management for public agency projects, covering all aspects of project oversight, including grant application, design, utility coordination, right-of-way, bidding assistance, construction management, and grant reporting. We also understand that the consultant must be capable of managing projects administered through Caltrans Local Assistance and other state and federal funding programs while maintaining compliance with applicable procedures, documentation requirements, and audit standards.

We recognize that the City needs a partner who can step in efficiently as an extension of City staff, coordinating with City departments, consultants, utilities, contractors, and outside agencies, and carrying projects from early planning and funding pursuit through design, bidding, construction, and closeout. A&M is structured to provide this oversight on a task-order basis, supplementing the City’s team with senior project management leadership without the overhead of permanent hires.

A&M Consulting Engineers brings hands-on experience managing municipal projects for Central Valley agencies, including City Engineer and on-call assignments, grant-funded capital improvements, roadway and active transportation projects, water and wastewater infrastructure, storm drainage improvements, surveying, environmental coordination, and construction management. Much of this work has been delivered in and around Kings County, in communities such as Lemoore, Corcoran, Avenal, Parlier, Exeter, Visalia, and Selma, giving the City of Hanford a consultant already familiar with the region and its funding programs.

Our firm is well suited for this assignment because we pair local responsiveness with practical experience overseeing state- and federally funded projects. Our team includes licensed civil engineers, land surveyors, and construction management personnel experienced in Caltrans LAPM procedures, funding compliance, project controls, utility and right-of-way coordination, and the preparation and review of complete bid and construction documents. Our approach is to serve as an extension of City staff through clear communication, disciplined QA/ QC, and reliable support from project initiation through completion.

A&M is committed to providing the City of Hanford with timely service, sound technical judgment, and practical solutions that keep projects moving while protecting funding eligibility and maintaining compliance, especially for projects involving multiple agencies, phased authorizations, and reimbursement-based funding.

We respectfully submit our qualifications for your consideration and would be honored to support the City of Hanford under this on-call contract. Please contact our office if you have any questions or require additional information.

Thank you for your time and consideration.

Sincerely,
Diego Corvera, PE, LCI
Project Manager
[email protected]
A&M 3

Page 250 of 444 ends

2. Consultant Information
About Us.

A&M Consulting Engineers can serve as an extension of City staff, providing project management and oversight across every phase of public agency project delivery, from grant application through construction and closeout.

A&M Consulting Engineers is headquartered in Visalia and provides on-call project management and municipal engineering support to public agencies throughout the Central Valley. Rather than simply producing design deliverables, A&M routinely steps into a project-oversight role, managing scope, schedule, budget, quality, and compliance on the City’s behalf while coordinating in-house staff, outside consultants, utilities, contractors, and funding agencies.

Our approach emphasizes direct communication with City staff, clear lines of accountability, disciplined scope and budget control, and complete, audit-ready work products delivered on schedule.

Business Address
A&M Consulting Engineers | Visalia Office
608 E. Center Avenue, Visalia, CA 93292
P: 559.429.4747
Local Presence
A&M Consulting Engineers operates in Visalia and
has successfully worked with various cities around
the area such as Parlier, Corcoran, Avenal, Exeter,
Selma, Lemoore, and Visalia.

Type of Organization
Corporation
Commercial General Liability
Policy Number: B7013593958
Business Automobile Liability
Policy Number: BUA7012551405
Workers’ Compensation & Employers’ Liability
Policy Number: EIG294378206
Professional Liability
Policy Number: ANE4938104.25
A&M 4
Certificates of Insurance
A&M Consulting Engineers maintains insurance
coverage consistent with the professional services
we provide to public agency clients.

Conflict of Interest Statement
A&M Consulting Engineers has no known conflicts of
interest related to its current contracts with the City of Hanford.

Litigation
A&M Consulting Engineers has not been involved in
any litigation in connection with prior projects.

Federal-Aid Provisions
A&M Consulting Engineers understands the
requirements of federally and state-funded projects
and will comply with all applicable federal-aid
provisions, Caltrans Local Assistance Procedures
Manual requirements, and related state and local
regulations.

Page 251 of 444 ends

2. Consultant Information
A&M 5
Professional Engineer
Orfil Muniz, PE
Professional Engineer
Javier Andrade, PE
Assistant Engineers
Edward Magana, EIT
Pedro Lopez, EIT
Gelasio Rodriguez
Anabel Tapia
Nelson Gomez
Kyndra Martinez
David Del Bosque
Derian Gutierrez
Assistant Construction Engineer
Alexis Gutierrez
Assistant Construction Engineer
Samuel Mudford
Professional Land Surveyor
Daniel Cerda, PLS
Assistant Land Surveyor
Luis Lopez, LSIT
Administrative Specialist
Mary Espinosa
Administrative Specialist
Graciela Aguilar
Construction Management
Land Surveying
Administrative Department
Key Personnel.

Project Manager
Diego Corvera, PE, LCI
Assistant Construction Engineer
Gonzalo Robledo
Resident Engineer
David Hernandez, PE

Page 252 of 444 ends

3. Scope of Work
A&M 6
Scope.

We understand the City of Hanford is seeking staff
augmentation for project management services, a
consultant who can provide all aspects of project
oversight for a public agency, spanning grant
application, design, utility coordination, right-of-way, bidding assistance, construction management, and
grant reporting.

Project Understanding:

The City of Hanford needs an experienced partner
who can step in as an extension of City staff and take
ownership of project delivery on a task-order basis.

A&M is built precisely for this role. As a Visalia-based firm already working throughout Kings County, we can
mobilize quickly, communicate directly with City staff, and manage projects from funding pursuit through
construction and closeout. We also recognize that
many of the City’s priority projects depend on outside
funding. Our team manages the documentation,
coordination, and reporting required to keep grantfunded projects compliant and reimbursable, from application and authorization through environmental
clearance, construction, closeout, and audit, so the
City realizes the full value of every grant dollar.

Scope of Services
A&M is prepared to provide the following services,
tailored to the scope, funding source, schedule, and
coordination needs of each individual task order.

Project Management & Oversight
• Serve as an extension of City staff, providing dayto-day project management across the full project lifecycle.
• Act as the City’s point of accountability for
assigned projects, managing scope, schedule,
budget, quality, and deliverables.
• Lead project meetings, track action items,
manage submittals and approvals, and
coordinate among City departments, consultants,
utilities, contractors, and agencies.
• Provide senior engineering judgment and decision
support, with regular status, schedule, and budget
reporting to City leadership.

Grant Application & Funding Pursuit
• Match City priorities to suitable state and federal
funding programs.
• Prepare competitive grant applications,
supporting exhibits, cost estimates, and justification
narratives.
• Coordinate with funding agencies through the
award process.

Design Management & Coordination
• Manage and oversee in-house and consultant
design teams on the City’s behalf.
• Review and coordinate plans, specifications, and
estimates for completeness, constructability, and
funding compliance.
• Confirm designs meet Caltrans / LAPM and
applicable standards, with independent QA/QC
review at key milestones.

Utility Coordination
• Identify potential utility conflicts early and
coordinate with utility owners.
• Manage relocations, agreements, and clearances
to protect the project schedule.
• Track utility commitments through design and
construction.

Right-of-Way (ROW) Support
• Coordinate ROW engineering, mapping, exhibits,
and certifications.
• Support acquisition coordination and
documentation consistent with funding
requirements.
• Track ROW status and clearances required before
construction.

Bidding Assistance
• Support advertisement and bidding; respond to
bidder questions / RFIs and prepare addenda.
• Maintain plan-holder information and attend prebid meetings and site walks. • Review bids for responsiveness, verify qualifications, and assist with the recommendation for award.

Construction Management
• Provide construction management, resident
engineering, and contract administration.
• Administer submittals, RFIs, schedules, pay
applications, certified payroll, and change-order
packages.

Page 253 of 444 ends

3. Scope of Work
A&M 7
Scope.
• Coordinate materials testing and inspection,
document field conditions, and manage punch
lists and as-builts.
• Oversee labor compliance (DIR / prevailing wage)
and environmental / SWPPP commitments.

Quality Control & Cost Management
• Independent senior-level QA/QC reviews at key
milestones to confirm completeness, coordination,
constructability, and compliance.
• Manage each task order under a defined, phasebased budget so the City can authorize work in a controlled manner.
• Track labor hours, subconsultant costs, and
reimbursables against the approved budget, and
flag potential changes early.
• Maintain defensible documentation, accurate
invoicing, and audit-ready records for
reimbursable projects.

Task-Order Approach & Deliverables
Each assignment begins by confirming objectives,
scope, schedule, budget, and required deliverables
with City staff, followed by a task-order-specific work plan with milestones and responsibilities.

Typical deliverables by phase include:
• Initiation — scope confirmation, work plan,
schedule and staffing plan, task-order budget.
• Project management — meeting agendas/
minutes, monthly progress and schedule updates,
agency-coordination records, invoice support.
• Design — 30/60/90/100% submittals, final PS&E
package, final engineer’s cost estimate, permit/
utility coordination documents.
• Bid — addenda, bid review documentation, bid
tabulation and recommendation.
• Construction & closeout — submittal reviews,
RFI responses, change-order documentation,
pay-application review, punch list, as-builts, and
closeout records.

Grant Reporting & Compliance
• Prepare and submit progress and financial reports
on each program’s platform and schedule.
• Maintain audit-ready records and reimbursement
documentation.
• Coordinate with Caltrans Local Assistance and
funding agencies through closeout and audit.

WATER RESOURCES

PLANNING

ENVIRONMENTAL

ENGINEERING

CONSTRUCTION

ENGINEERING &

MANAGEMENT

TRANSPORTATION

ENGINEERING

PARKS &

RECREATION

Page 254 of 444 ends

A&M 8

4. Approach
Community Outreach.

Two-Stage Outreach Approach
• We treat community outreach as a continuous process:
first to gather input that shapes grant applications, then to fulfill outreach and reporting requirements once
funding is awarded.

Pre-Grant Community Input
• Conduct community meetings, workshops, and pop-up
events to identify needs, safety concerns, and project
ideas.
• Use clear visual exhibits, concept sketches, and plainlanguage summaries of potential improvements. • Provide multilingual surveys (online and in-person)
and coordinate with schools, community groups, and
businesses.
• Ensure that grant applications are grounded in
community-identified needs and priorities.

Grant-Funded Outreach & Compliance
• Prepare outreach plans tailored to each grant
program’s guidelines and schedules.
• Host public meetings to review design options and
project milestones, and support school-based safety
campaigns and volunteer events.
• Manage logistics, materials, sign-in sheets, photos,
and summary memos for use in grant progress reports
and closeout documentation.

City Partnership & Capacity Building
• Act as an extension of City staff by organizing and
documenting outreach so it is meaningful to residents
and fully compliant with funding requirements.
• Use completed outreach to strengthen future
grant applications and build a reliable pipeline of
competitive projects for the City of Hanford.

Community Town Hall Meetings
A&M Consulting Engineers hosts town hall meetings in partnership with the cities we serve to gather valuable input from community members. We recognize the importance of listening to residents’ concerns and priorities. During these meetings, our team presents exhibits of potential projects that have generated community interest.

Attendees are encouraged to provide feedback and suggest changes, ensuring the proposals reflect local needs. This collaborative process allows us to refine project concepts and pursue grant funding opportunities, minimizing reliance on local funds and maximizing community benefit.

City of Corcoran Community Cleanup Event
A&M Consulting Engineers partnered with the City of Corcoran on a resident-led cleanup campaign that brought neighbors, staff, and volunteers together to clean streets, alleys, and public spaces. These events met Clean CA Local Grant requirements and paved the way for permanent improvements along the Whitley Avenue gateway corridor, including drought-tolerant landscaping, targeted litter reduction, energy-efficient lighting, and ADA-accessible sidewalks, curb ramps, and crossings. The result is a safer, brighter, and more welcoming entrance to Corcoran that reflects community pride and invites families to walk, gather, and feel at home.

City of Selma Tactical Urbanism Pilot Study 1
A&M Consulting Engineers partnered with Selma Unified School District and the City of Selma on an STP-funded Tactical Urbanism pilot to quickly improve streets around school campuses. With principals, crossing guards, and families, we installed low-cost, quick-build curb extensions, daylighted corners, high-visibility crosswalks, simplified student pick-up/drop-off, median refuges, and clear signing/striping. Before/ after observations, speed checks, and student travel tallies showed calmer, more predictable drop-off and now guide permanent safety improvements shaped by families’ input.

Past Community Outreach Events

Page 255 of 444 ends

A&M 9

4. Approach
Grant Management.

After conducting meaningful community outreach, A&M Consulting Engineers takes the community’s concerns and priorities and turns them into clear and fundable projects.

We then match projects with the most suitable state and federal programs and structure competitive applications so community-driven needs can move forward with secured funding.

Develop and Maintain a Grant Management Plan:

A&M is well-versed in creating comprehensive grant management plans that outline key milestones, deliverables, and responsibilities. These plans serve as roadmaps to ensure that every aspect of the grant is systematically addressed and that all stakeholders are aware of their roles and timelines.

Monitor Grant Expenditures and Budget Adherence:

Budget management and adherence to grantor requirements are critical aspects of our expertise. We have a proven ability to closely monitor grant expenditures, track financial data, and ensure that spending aligns with grant guidelines. This approach guarantees compliance while optimizing resource utilization.

Coordinate with City Staff:

Collaboration is at the heart of our approach. We work closely with program staff to ensure that project activities align seamlessly with the grant’s objectives. Effective communication and coordination are central to our strategy for successful grant implementation.

Maintain Detailed Records and Documentation:

Our team places a premium on record-keeping and documentation.

We maintain meticulous records of all grant-related activities, transactions, and correspondence. This rigorous documentation is essential for demonstrating compliance and accountability to grantors.

Prepare and Submit Progress Reports:

We are proficient in preparing and submitting regular progress reports to grantors in strict accordance with established timelines and guidelines.

Our reports provide a comprehensive overview of project developments, achievements, challenges, and financial updates. Timely reporting is a hallmark of our commitment to transparency.

We are experienced in managing the diverse reporting requirements of our funding sources. For example, under the CDBG program, we submit a Quarterly Progress Report via the eCivis platform that includes both financial and activity data. Similarly, funding sources such as Clean CA require a quarterly progress report, submitted within 45 days, using Smartsheet.

Maintain Accurate and Complete Grant Files:

Our dedication to organization extends to maintaining accurate and complete grant files. These files include financial records, progress reports, correspondence with grantors, and any other pertinent documents. Our systematic approach ensures that all documentation is readily accessible and well-organized.

Ensure Timely Submission of Required Documentation:

Meeting deadlines for grant deliverables is non-negotiable for us. We prioritize timely submission of all required materials, from progress reports to financial statements and any additional documentation specified by grantors. This punctuality is integral to maintaining positive relationships with funding entities.

Page 256 of 444 ends

A&M 10

4. Approach
Design.

Project Initiation & Coordination
• Hold kickoff meeting to confirm City priorities, schedule, and communication protocols.
• Review available background information (plans,
studies, reports, and standards).
• Refine project objectives, deliverables, and key
milestones with the City.

Existing Conditions & Data Collection
• Conduct site visits to document existing conditions,
constraints, and opportunities.
• Gather and review relevant data (as-built drawings,
utilities, surveys, traffic/usage data, environmental
information, etc.)
• Identify potential conflicts, access issues, and right-ofway or property constraints.

Analysis & Concept Development
• Analyze existing conditions and data to understand
needs, deficiencies, and risks.
• Develop and compare feasible design concepts,
including “no build” or minimal-intervention options
where appropriate.
• Evaluate concepts against applicable standards,
Owner objectives, constructability, and life-cycle costs. • Meet with the Owner to review concepts and confirm a
preferred alternative for design.

Preliminary Design (Concept to ~30%)
• Prepare preliminary layouts, typical sections, and key design parameters.
• Identify required surveys, geotechnical work, or
specialty studies and incorporate findings.
• Coordinate early with utilities, permitting agencies, and affected stakeholders.
• Provide a preliminary opinion of probable construction cost for budget and phasing discussions.

Design Development & PS&E (Progress Submittals)
• Advance the design through structured submittals (e.g., 30%, 60%, 90%, and Final).
• Prepare and refine:
- Plan drawings, details, & profiles.
- Technical specifications & special
provisions.
- Quantities and detailed Engineer’s Estimates.
- Staging and temporary traffic control or
access plans, if applicable.
• Integrate comments from the City, utilities, and
reviewing agencies at each stage.

Quality Assurance / Quality Control (QA/QC)
• Assign senior staff not involved in day-to-day production to perform independent reviews.
• Check for conformance with applicable codes,
standards, and funding requirements.
• Verify consistency among plans, specifications, and
estimates.
• Review for constructability, phasing, safety, and longterm maintenance considerations.

Permitting, Approvals, and Coordination
• Support the City in obtaining required permits and
approvals.
• Coordinate with regulatory agencies, utilities, and
stakeholders to resolve issues early.
• Update design documents to reflect permit conditions
and final agreements.

Page 257 of 444 ends

A&M 11

4. Approach
Construction Engineering &
Management.

A. Pre-Construction

1. Perform constructability reviews to identify risks, schedule constraints, and value engineering opportunities.

2. Facilitate pre-construction conferences, prepare agendas and distribute minutes within 24 hours.

3. Document existing site conditions through baseline photo and video surveys.

4. Coordinate permits, encroachment approvals, and traffic management plans with the City and Caltrans.

5. Notify utility companies of potential conflicts and plan for long-lead procurement items.

B. Construction Administration and Field Management

1. Provide daily oversight through the Resident Engineer (RE) and City inspectors to confirm contract compliance.

2. Administer Requests for Information (RFIs), submittals, and shop drawings using a controlled logging system (Bluebeam and City-approved formats).

3. Monitor project schedules using Critical Path Method (CPM) reviews and implement recovery actions when negative float is identified.

4. Implement cost control measures, including quantity verification, independent cost estimates, and comprehensive change-order packages that clearly segregate participating and non-participating costs.

5. Independent Assurance (IA) Testing:
- Coordinate with Caltrans or designated IA laboratories to perform split-sample testing and technician observation of the City’s acceptance testers.
- Verify calibration of equipment such as nuclear density gauges, compression machines, and asphalt sampling devices.
- Document results to ensure that acceptance testing is performed by qualified personnel in accredited laboratories.
- Submit annual proficiency and IA reports as required by Caltrans and FHWA.

6. Oversee labor compliance, including certified payrolls through the Department of Industrial Relations (DIR) electronic portal, worker interviews, and prevailing wage verification.

7. Monitor environmental commitments (such as CEQA or NEPA mitigation) and Stormwater Pollution Prevention Plan (SWPPP) measures.

8. Support public outreach, including notifications to residents and businesses, stakeholder meetings, and utility coordination.

C. Closeout

1. Coordinate final punch lists with City staff and contractors.

2. Maintain continuously updated as-built drawings and compile them into a final electronic record set.

3. Verify the final materials testing report, ensuring both acceptance testing and Independent Assurance (IA) documentation are complete.

4. Process final pay estimates, assist with preparation of Notice of Completion, and support City Council staff reports.

Page 258 of 444 ends

A&M 12

5. Experience
The projects below reflect A&M Consulting Engineers’ hands-on experience managing public works delivery for cities across the Central Valley, many within or adjacent to Kings County. In each, A&M served as an extension of City staff, providing the same project oversight the City of Hanford is seeking: pursuing and managing grant funding, coordinating design and utilities, advancing right-of-way and bidding, and overseeing construction through closeout. Together they demonstrate our ability to keep public agency projects on schedule, on budget, and in compliance from start to finish.

Experience.

Funding Type Funding Source Name of Project Owner Project Cost
Local/State Active Transportation Program
(ATP)
Goshen Trail Rehabilitation
Project City of Visalia $43M
Local/State
Gas Tax Fund, Wastewater Trunkline
Fund, Measure R Local, Storm
Sewer Construction Fund
Shirk Capacity Enhancement
project City of Visalia $21M
Federal/
Local
EDA Grant, Measure R Regional,
Transportation Impact Fee Riggin Widening Kelsey to Shirk City of Visalia $13M Federal/
Local
HIP through FHWA, Measure R
Regional, Transportation Impact
Fee
Riggin Avenue widening
Mooney to Conyer City of Visalia $10M
Federal/
State
STBGP + HIP through FHWA, plus
RMRA/SB 1
Tulare Avenue Rehabilitation
Project City of Visalia $6M
State RMRA/SB 1 County Center St Rehabilitation
Project City of Visalia $3.5M
Local/
Federal
Federal Transportation
Enhancement (TE) Funds + local
Measure R Funds
Packwood Creek Trail Project City of Visalia $3.5M
State Measure R Trailways Fund Greenway Trail Phase 1 & 2 City of Visalia $3M Local/State
Measure R Local, State
Transportation, Transportation
Impact Fund (TIF)
Riggin Ave County Center &
Giddings Signalization City of Visalia $2M
State Wastewater Facility Fund Ave 288 Road Reconstruction Project City of Visalia $2M
Federal TIRCP Cycle 8 State grant funds COV Transit Operations Electric Bus Charging Project City of Visalia $1M

Page 259 of 444 ends

Funding Type Funding Source Name of Project Owner Amount State Prop 68 Gateway Park City of Corcoran $7M
State Urban Greening Grant
Program
Fig Tree Park City of Parlier $5M
State Urban Flood Protection
Grant Program
Parlier Flood Protection
Project
City of Parlier $4M
State Active Transportation
Program (ATP)
Corcoran Safe Routes to
School
City of Corcoran $3.5M
State Active Transportation
Program (ATP)
Selma Branch Canal
Parkway
City of Selma $3.5M
State Active Transportation
Program (ATP)
Limitless Lane Network City of Parlier $3M
Federal Active Transportation
Program (ATP)
School Corridor Active
Transportation Improvements
City of Parlier $3M
State Clean California Local Grant
Program
Selma SR-99 Gateway to
Downtown
City of Selma $3M
State Clean California Local Grant
Program
Community Beautification
and Cleanup Project
City of Corcoran $2.6M
Federal Surface Transportation Block
Grant (STBG)
Manning Avenue
Rehabilitation
City of Parlier $3.4M
Federal Congestion Mitigation and
Air Quality (CMAQ)
2021 Ped & Bicycle Facility
Improvements Phase 1 & 2
City of Corcoran $1.1M
Federal Congestion Mitigation and
Air Quality (CMAQ)
2020 Ped & Bicycle Facility
Improvements Phase 1 & 2
City of Corcoran $900K
State Sustainable Transportation
Planning Program (STP)
EV Charging Infrastructure
Network Plan
City of Corcoran $300K
State Sustainable Transportation
Planning Program (STP)
Tactical Urbanism Safe
Streets Study
City of Selma $300K
Federal Highway Infrastructure
Program (HIP)
Corcoran 2020 HIP Road
Maintenance
City of Corcoran $261K
State Highway Safety
Improvement Program (HSIP)
Various – Cycle 10 City of Corcoran $250K
State Highway Safety
Improvement Program (HSIP)
Bush Street Pedestrian Safety
Improvements Project
City of Lemoore $250K
State Highway Safety
Improvement Program (HSIP)
Various – Cycle 10 City of Parlier $250K
State Per Capita Program Heritage Park Playground &
Earl Ruth Park Playground
City of Parlier $188K
State/Federal Systemic Safety Analysis
Report Program
City of Parlier Local
Roadway Safety Plan
City of Parlier $65K
State/Federal Systemic Safety Analysis
Report Program
City of Corcoran Local
Roadway Safety Plan
City of Corcoran $65K
Federal Congestion Mitigation and
Air Quality (CMAQ)
Roundabout at Parlier Ave
and Newmark Ave
City of Parlier $1.6M
State Small Community Drought
Relief Program
Water Storage Tank City of Parlier $765K
State Sustainable Transportation
Planning Program (STP)
Parlier Active Transportation
Study - Tactical Urbanism
City of Parlier $353K

5. Experience
A&M 13
Additional projects.

Page 260 of 444 ends

A&M 14

5. Experience

KIDS POCKET PARK
Avenal, CA

10. Project Objective: The Kids Pocket Park Project was developed to create a smallscale, accessible neighborhood park that provides safe play space, shaded seating, and everyday recreational opportunities for local families and children.

11. Project Description: A&M Consulting Engineers provided construction management and grant administration services for the Kids Pocket Park Project in Avenal. The project created a community-oriented park with inclusive play features, looping accessible walkways, shaded seating areas, native drought-tolerant landscaping, decorative site elements, and lighting improvements designed to support safe and comfortable public use.

1. Contracting City
City of Avenal

2. Contracting City Project
Manager
Antony V. Lopez
City Manager

3. Contracting City Contact
Information
(559) 386-5766

4. Contract Amount
$776,922

5. Project Type(s) and Description
of Responsibilities
-Construction Management
-Grant Management

6. Funding Source
State

7. Date of Contract
7/1/2018

8. Date of Completion
7/1/2025

9. Consultant Project Manager
and contact information
Diego Corvera, PE
[email protected]

12. Project Outcome: Kids Pocket Park created a functional and inviting neighborhood amenity that improved access to recreation, supported family-oriented outdoor activity, and enhanced the quality of life for nearby residents.

Page 261 of 444 ends

A&M 15

5. Experience

CITY OF PARLIER MANNING AVENUE REHABILITATION PROJECT
Parlier, CA

10. Project Objective: The Manning Avenue
Rehabilitation Project aimed to improve safety,
enhance road conditions, and strengthen
regional connectivity for the community.

11. Project Description: A&M developed complete Plans, Specifications, and Estimates (PS&E) and provided project management services to maintain budget and schedule, ensuring the project was delivered in compliance with local, state, and federal standards, including Caltrans Local Assistance procedures. The improvements enhanced roadway safety, improved drainage efficiency, and upgraded the corridor’s visual character. The rehabilitation will extend pavement service life by approximately 30 years, addressing critical infrastructure and safety needs for the City of Parlier and the regional transportation network.

1. Contracting City
City of Parlier

2. Contracting City Project
Manager
David Del Bosque
Public Works Director

3. Contracting City Contact
Information
(559) 646-3700

4. Contract Amount
$3,475,678.42

5. Project Type(s) and Description
of Responsibilities
-Engineering Design
-Surveying
-Construction Engineering
-Guidance & Compliance
with Federal, State, and Local
Regulations

6. Funding Source
Federal

7. Date of Contract
05/31/2023

8. Date of Completion
9/3/2025

9. Consultant Project Manager
and contact information
Orfil Muniz, PE
[email protected]

12. Project Outcome: The project resulted in improved roadway safety, rehabilitated pavement infrastructure, enhanced long-term corridor performance, and improved regional mobility for the City of Parlier.

Page 262 of 444 ends

A&M 16

5. Experience
1, 2, 3 – TCP REMOVAL TREATMENT SYSTEMS PROJECT
Parlier, CA

10. Project Objective: The City of Parlier’s TCP Treatment Project enhances community infrastructure and public health by
delivering new water treatment filters, tanks, and supporting improvements such as upgraded utilities, pavement, lighting, and landscaping that create a safer, more reliable, and sustainable environment for residents.

11. Project Description: A&M Consulting Engineers provided construction management and oversight for the City of Parlier’s TCP Removal Treatment Project, which delivered a centralized GAC treatment plant and well-site upgrades. Our CM/RE role centered on verifying contractor and project compliance with environmental, permitting, and funding requirements and coordinating with the State Water Resources Control Board to ensure regulatory compliance. Through this construction-phase support, the project advanced toward providing safe, reliable drinking water while maintaining conformance with applicable state and federal standards.

1. Contracting City
City of Parlier

2. Contracting City Project
Manager
David Del Bosque
Public Works Director

3. Contracting City Contact
Information
(559) 646-3700

4. Contract Amount
$17,615,832

5. Project Type(s) and Description
of Responsibilities
-Engineering Design
-Construction Engineering

6. Funding Source
State

7. Date of Contract
2/17/2017

8. Date of Completion
12/31/2024

9. Consultant Project Manager
and contact information
Orfil Muniz, PE
[email protected]

12. Project Outcome: The project resulted in improved drinking water system reliability, enhanced regulatory compliance, and expanded the City’s capacity to provide safe, treated water through the successful construction of the TCP removal treatment facility and associated well-site improvements.

Page 263 of 444 ends

A&M 17

5. Experience

GATEWAY PARK
Corcoran, CA

10. Project Objective: The Gateway Park Project was intended to create a signature community park for the City of Corcoran by delivering a safe, accessible, and familyoriented public space with recreational amenities, gathering areas, and site features that support everyday use and community events.

11. Project Description: A&M Consulting Engineers provided surveying, environmental clearance support, engineering design, traffic engineering, construction engineering, and grant compliance services for the Gateway Park Project. The 8-acre park was designed as a prominent community destination and included picnic areas, a veteran’s memorial monument, an amphitheater, decorative concrete improvements, a water-efficient splashpad, accessible playgrounds, parking, and related site infrastructure. A&M also supported project delivery through planning, design, bidding, and construction-phase services.

1. Contracting City
City of Corcoran

2. Contracting City Project
Manager
Joseph Faulkner
Public Works Director

3. Contracting City Contact
Information
(559) 992-2151

4. Contract Amount
$7,090,140

5. Project Type(s) and Description
of Responsibilities
-Surveying
-Environmental Clearance
-Engineering Design
-Traffic Engineering
-Construction Engineering
-Guidance & Compliance
with Federal, State, and Local
Regulations

6. Funding Source
State

7. Date of Contract
7/1/2018

8. Date of Completion
6/30/2024

9. Consultant Project Manager
and contact information
Orfil Muniz, PE
[email protected]

12. Project Outcome: Gateway Park created a lasting public asset for the City of Corcoran by transforming the site into an accessible, multi-use community destination that enhances recreation, civic identity, and quality of life. 2025 Public Works Project of the Year
in the Structures Category

Page 264 of 444 ends

A&M 18

5. Experience

PARLIER FLOOD PROTECTION PROJECT
Parlier, CA

10. Project Objective: This project improves Parlier’s stormwater infrastructure while at the same time creating safe, accessible, and attractive public spaces, enhancing flood protection, community amenities, and overall quality of life.

11. Project Description: A&M Consulting Engineers provided construction management and resident engineering services for the City of Parlier’s Urban Flood Protection Project.

Our CM/CE role included oversight of storm drain and sewer manholes, and basin improvements. We monitored construction of the new pump station at Richard Flores Basin and coordinated delivery of associated hardscape. Throughout the project, A&M administered construction activities to verify compliance with design intent and project requirements, supporting the City in successfully delivering critical stormwater conveyance upgrades and community amenities.

1. Contracting City
City of Parlier

2. Contracting City Project
Manager
David Del Bosque
Public Works Director

3. Contracting City Contact
Information
(559) 646-3700

4. Contract Amount
$5,018,562

5. Project Type(s) and Description
of Responsibilities
-Engineering Design
-Construction Engineering

6. Funding Source
State

7. Date of Contract
10/2021

8. Date of Completion
3/2026

9. Consultant Project Manager
and contact information
Orfil Muniz, PE
[email protected]

12. Project Outcome: The project enhanced the City of Parlier’s stormwater infrastructure by improving drainage capacity, supporting flood protection, and delivering related public improvements that increased site functionality, accessibility, and community benefit.

Page 265 of 444 ends

A&M 19

5. Experience

FIG TREE PARK
Parlier, CA

10. Project Objective: The Fig Tree Park Project was developed to transform an underutilized open space into a safe, shaded, and accessible neighborhood park with ADA-compliant pathways, play areas, seating, native landscaping, and site improvements that enhance comfort, usability, and long-term community value.

11. Project Description: A&M Consulting Engineers provided engineering design, surveying, environmental clearance support, grant-related coordination, and funding reimbursement assistance for the Fig Tree Park Project. The project included design of accessible pedestrian pathways, drought-tolerant landscaping with drip irrigation, and site improvements associated with development of a new public park. A&M also coordinated closely with the City of Parlier and funding agencies to support project delivery and required documentation.

1. Contracting City
City of Parlier

2. Contracting City Project
Manager
David Del Bosque
Public Works Director

3. Contracting City Contact
Information
(559) 646-3700

4. Contract Amount
$2,878,230

5. Project Type(s) and Description
of Responsibilities
-Engineering Design
-Surveying
-Construction Engineering
-Environmental Clearance
-Guidance & Compliance
with Federal, State, and Local
Regulations

6. Funding Source
State

7. Date of Contract
10/2023

8. Date of Completion
10/2024

9. Consultant Project Manager
and contact information
Orfil Muniz, PE
[email protected]

12. Project Outcome: The project transformed an underutilized site into a functional and welcoming public park that improved accessibility, provided new recreational amenities, and enhanced neighborhood quality of life through thoughtful site design and communityfocused improvements.

Page 266 of 444 ends

A&M 20

5. Experience

CORCORAN SAFE ROUTES TO SCHOOL PROJECT
Corcoran, CA

10. Project Objective: The Corcoran Safe Routes to School Project was developed to improve pedestrian and bicyclist safety, accessibility, and connectivity around neighborhood schools by implementing infrastructure upgrades that create safer, more reliable routes for students and families traveling to and from school.

11. Project Description: A&M Consulting Engineers provided engineering design and project delivery services for the Corcoran Safe Routes to School Project, including preparation of the successful ATP Cycle 5 grant application, design, bidding, and construction management. The project included plans, specifications, and estimates; roadway, drainage, and pavement design; utility coordination; and construction of ADA-compliant sidewalks, curb and gutter, curb ramps, signage, striping, and pavement markings to improve safety and accessibility around neighborhood schools.

1. Contracting City
City of Corcoran

2. Contracting City Project
Manager
Joseph Faulkner
Public Works Director

3. Contracting City Contact
Information
(559) 992-2151

4. Contract Amount
$1,763,000

5. Project Type(s) and Description
of Responsibilities
-Traffic Engineering
-Land Surveying
-RE Services
-Transportation Planning
-Guidance & Compliance
with Federal, Local, and State
Regulations

6. Funding Source
State

7. Date of Contract
3/22/2024

8. Date of Completion
9/23/2025

9. Consultant Project Manager
and contact information
Orfil Muniz, PE
[email protected]

12. Project Outcome: The project enhanced safety and accessibility in school areas by delivering pedestrian, bicycle, and traffic control improvements that support safer routes to school and improve everyday mobility for students, families, and the community.

Page 267 of 444 ends

A&M 21

5. Experience
City of Parlier
Contact: David Del Bosque
Public Works Director
Address: 1100 E Parlier Ave,
Parlier, CA 93648
Phone: (559) 646-3700
Email: [email protected]
City of Avenal
Contact: Antony V. Lopez
City Manager
Address: 919 Skyline Blvd,
Avenal, CA 93204
Phone: (559) 386-5766
Email: [email protected]
City of Corcoran
Contact: Joseph Faulkner
Public Works Director
Address: 832 Whitley Ave,
Corcoran, CA 93212
Phone: (559) 992-2151
Email: [email protected]
City of Lemoore
Contact: Estevan Benavides
Public Works Director
Address: 119 Fox St,
Lemoore, CA 93245
Phone: (559) 924-6744
Email: [email protected]
References:

Page 268 of 444 ends

Appendix A - Resumes
A&M 22
Diego Corvera, PE, LCI
Project Manager
Diego is a Licensed Professional Engineer (PE) with over 15 years of municipal engineering experience, specializing in capital improvement projects (CIP), transportation engineering, and community collaboration. Proven track record leading multidisciplinary teams, including finance, engineering, planning, and marketing staff, through complex funding processes. Successfully served as lead engineer for a seven-person City team in the Cycle 7 Active Transportation Program grant process, securing over $50M for the City of Visalia - highest award granted to any City under 200,000 population in a single cycle.

Engineering Experience
15+ Years
Education
B.S. in Civil Engineering
with a Minor in Mathematics,
California State University,
Sacramento
Registration
State of California
No. 85615
City of Visalia
Riggin Avenue Widening Mooney to Conyer
City of Visalia
Riggin Widening Kelsey to Shirk
City of Visalia
Shirk Capacity Enhancement Project
City of Visalia
Goshen Trail Rehabilitation Project
City of Visalia
Riggin Avenue County Center & Giddings Signalization
City of Visalia
Packwood Creek Trail Project
City of Visalia
Tulare Avenue Rehabilitation Project
City of Visalia
County Center Street Rehabilitation Project
City of Visalia
Avenue 288 Road Reconstruction Project
City of Visalia
COV Transit Operations Electric Bus Charging Project
City of Visalia
Backup Generator Project COV Corporation Yard
City of Visalia
St Johns Trail Landscaping East & West of Dinuba Blvd
City of Visalia
Modoc Trail Landscaping
City of Avenal
Climate Action and Adaptation Plan
City of Avenal
Water Master Plan
City of Avenal
Avenal Sports and Community Center

Page 269 of 444 ends

Appendix A - Resumes
Javier Andrade, PE, QSD
Javier Andrade, PE, is A&M’s Principal Engineer. A licensed civil engineer, he plans, designs, and manages federally and state-funded projects to Caltrans LAPM and FHWA standards.

His portfolio spans water distribution and storage, wastewater collection and lift stations, stormwater capture and LID, neighborhood parks, roadway rehabilitation and complete streets, and traffic engineering (warrants, signage, striping, and signals). Trusted for clear communication and steady leadership, Javier pairs practical judgment with hands-on support so cities see compliant, on-schedule results.

Engineering Experience
15+ Years
Education
B.S. in Civil Engineering,
California State University, Fresno
Registration
State of California
No. 87348
General Building Contractor
No. 957096
City of Avenal
Safe Routes to School State Route 269 Improvement Project (ATP Cycle 4)
City of Avenal
Avenal Cutoff Road Rehabilitation (SB 1)
City of Parlier
Safe Routes to School (ATP Cycle 3)
Fresno County
Jensen Avenue Overlay & Shoulder Improvements (CMAQ)
City of Corcoran
2020 Pedestrian and Bicycle Improvements (CMAQ)
Phase 1 & 2
City of Corcoran
2024 Pedestrian and Bicycle Improvements (CMAQ)
Phase 1 & 2
City of Parlier
Sequoia Walkway
City of Parlier
Downtown Beautification
City of Parlier
Tuolumne Street Pedestrian Safety Improvements
(HSIP Cycle 10)
City of Parlier
Tuolumne Street & Ericka Avenue Pedestrian Safety
Improvements (HSIP Cycle 11)
City of Parlier
Zediker and Zulma Crosswalk
City of Parlier
Fig Tree Park (Urban Greening)
City of Parlier
Parlier & Newmark Roundabout (CMAQ, STBG)
City of Selma
Selma SR-99 Gateway to Downtown Revitalization Project
(Clean CA Local Grant Program)
A&M 23
Professional Engineer

Page 270 of 444 ends

Appendix A - Resumes
A&M 24
Orfil Muniz, PE, QSD, QISP, SUAS
Professional Engineer
Orfil Muniz, PE, QSD, QISP, SUAS, is A&M’s Principal Engineer. He delivers state and federal projects from concept to closeout, reliably meeting Caltrans LAPM and FHWA requirements. His work spans water and wastewater systems, stormwater capture and LID, parks, roadway rehabilitation and complete streets, and traffic engineering, warrants, signing, striping, and signals.

As QSD/QISP, he embeds compliance in every phase; with SUAS, he speeds field reviews. Calm, hands-on leadership and clear communication define his get-it-built approach.

City of Lemoore
Bush Street Pedestrian Improvements (HSIP Cycle 10)
City of Lemoore
Crack Seal Project
City of Lemoore
Public Facilities Maintenance District Sidewalk Repairs (PFMD)
City of Corcoran
Dairy Ave Pedestrian Safety Improvements (HSIP Cycle 10) City of Corcoran
Community Beautification & Cleanup (Clean CA Local
Grant Program)
City of Parlier
Manning Avenue Rehabilitation (CRSSAA & STBG)
City of Lemoore
D Street Accessibility Curb Ramp Improvements
City of Lemoore
19th Avenue Pedestrian Facilities Improvements (CMAQ)
City of Corcoran
2024 Pedestrian and Bicycle Improvements (CMAQ)
Phase 1 & 2
City of Corcoran
Safe Routes to School (ATP Cycle 5)
City of Parlier
Parlier Avenue Roundabout (CMAQ)
County of Fresno
Fresno Sunnyside & Teague Roundabout (CMAQ & STBG)
City of Corcoran
Traffic Impact Study - Gas Station on Highway 43 & 5 ½
Avenue
City of Corcoran
Orange Avenue Pedestrian Facilities Improvements
(CDBG-PI)
Engineering Experience
15+ Years
Education
B.S. in Civil Engineering,
California State University, Fresno
Continued Education
Construction Management,
California State University, San Jose
Business Administration,
College of the Sequoias
Registration
State of California
No. 88165
State of Nevada
No. 025208
CSLB General Contractor
1081929

Page 271 of 444 ends

Appendix A - Resumes
A&M 25
David Hernandez, PE
Professional Civil Engineer
David is a licensed civil engineer who supports the planning, design, and delivery of federally and state-funded public infrastructure projects here at A&M Consulting Engineers. His experience spans water, wastewater, stormwater, transportation, parks, and traffic engineering projects, with a strong
understanding of applicable agency standards and funding requirements.

Engineering Experience
15+ Years
Education
B.S. in Civil Engineering, M.S.

Structural Engineering at Stanford
University
Registration
State of California
No. 85730
City of Visalia
Green Acres Enhanced Crosswalk Improvements
City of Visalia
Wittman Center Remodel Improvements
City of Visalia
Visalia Convention Center AC Extension
City of Selma
Selma Clean California Second Street Beautification
City of Visalia
Birdland Sewer Project
City of Visalia
Recreation Ballpark Field Improvements
City of Visalia
Visalia Community Garden
City of Visalia
Riggin Avenue Widening from Demaree to Akers
City of Visalia
Visalia Downtown Streetlight Project
City of Visalia
Tipton AVE CIPP Sewer Project
City of Visalia
Visalia Improvement Standards Update
City of Visalia
Parcel & Final Maps Review (Various)
City of Visalia
Subdivision Tracts Review (Various)
City of Visalia
Commercial Project Review (Various)
City of Visalia
Santa Fe Trail to Mooney Grove Bicycle Improvement Study City of Visalia
Landscape & Lighting Districts (Various)

Page 272 of 444 ends

Appendix A - Resumes
A&M 26
Engineering Experience
5+ Years
Education
California State University, Bakersfield
B.S. Engineering Sciences
Anabel Tapia
Anabel Tapia is an Engineering Assistant at A&M Consulting Engineers. She supports planning, design, and construction delivery for pedestrian, park, roadway, and trail improvements. Anabel prepares plan exhibits and cost estimates, coordinates utility and right-of-way research, and assists with permitting, bid packages, and construction documentation. Detail-oriented and peoplefocused, she uses Civil 3D and Bluebeam to keep submittals on track and communicates clearly with city staff, consultants, and contractors so projects move forward smoothly.

City of Corcoran
Community Beautification & Cleanup (Clean CA Local
Grant Program)
City of Corcoran
2024 Pedestrian and Bicycle Improvements (CMAQ)
Phase 1 & 2
City of Parlier
Sequoia Walkway
City of Corcoran
Safe Routes to School (ATP Cycle 5)
City of Parlier
Manning Avenue Rehabilitation (CRSSAA & STBG)
City of Parlier
Manning Avenue Sidewalk Phase 2 (CMAQ)
City of Lemoore
D Street Accessibility Curb Ramp Improvements
City of Parlier
Downtown Beautification
City of Corcoran
Gateway Park (Prop 68)
City of Parlier
Parlier Flood Protection Project (UFP Grant Program)
City of Parlier
Fig Tree Park (Urban Greening)
City of Parlier
Tactical Urbanism Study (STP)
City of Parlier
Limitless Lane Network (ATP Cycle 6)
City of Selma
SR-99 Gateway to Downtown Revitalization Project
(Clean CA Local Grant Program)
Assistant Engineer

Page 273 of 444 ends

Appendix A - Resumes
A&M 27
City of Corcoran
2020 Pedestrian and Bicycle Improvements
Phase 1 & 2 (CMAQ)
City of Parlier
Sequoia Walkway
Fresno County
Jensen Avenue Overlay & Shoulder Improvements
(CMAQ)
City of Parlier
Parlier Avenue Roundabout (CMAQ & STBG)
City of Parlier
Downtown Beautification
City of Corcoran
Gateway Park (Prop 68)
City of Corcoran
Dairy Ave Pedestrian Safety Improvements
(HSIP Cycle 10)
City of Parlier
Tuolumne Street & Ericka Avenue Pedestrian Safety
Improvements (HSIP Cycle 11)
City of Parlier
Fig Tree Park (Urban Greening)
City of Corcoran
Safe Routes to School Project (ATP Cycle 5)
Experience in Preparing Funding Applications for the
following Grant Programs:

Highway Safety Improvement Program (HSIP)
Active Transportation Program (ATP)
Congestion Mitigation and Air Quality (CMAQ) Program
Sustainable Transportation Planning (STP) Program
Surface Transportation Block Grant (STBG) Program
Carbon Reduction Program (CRP)
Safe Streets and Roads for All (SS4A)
Highway Infrastructure Program (HIP)
Engineering Experience
7+ Years
Education
California State University, Fresno
B.S. in Political Science
Gelasio Rodriguez
Gelasio Rodriguez is an Assistant Engineer at A&M Consulting Engineers. He supports federally and state-funded transportation projects from programming through closeout, maintaining Caltrans LAPM compliance. Gelasio prepares progress reports and invoices, tracks DBE and labor compliance, and keeps ATP/SS4A grant reporting on schedule. He assists with PS&E, bid packages, and construction documentation, coordinating with city staff and Caltrans Local Assistance. Detail-oriented and dependable, Gelasio uses Civil 3D and Bluebeam to keep deliverables accurate and timely.

Assistant Engineer

Page 274 of 444 ends

Appendix A - Resumes
A&M 28
City of Corcoran
2021 Pedestrian and Bicycle Improvements (CMAQ)
Phase 1&2
County of Fresno
Choinumni Park
City of Lemoore
Bush Street Pedestrian Safety Improvements
(HSIP Cycle 10)
County of Tulare
Mooney Grove Dog Park
City of Corcoran
Safe Routes to School (ATP Cycle 5)
County of Tulare
Government Building Parking Lot Improvements
City of Corcoran
Electric Vehicle Charging Infrastructure Network Plan
(STP)
City of Parlier
Flood Control & Groundwater Banking Project (Prop 1)
City of Corcoran
Safe Routes to School Project (ATP Cycle 5)
City of Corcoran
Letts Lift Station Improvements
City of Lemoore
2024 Annual Road Maintenance Project (SB1)
City of Lemoore
19th Avenue Pedestrian Facilities Improvements
Project (CMAQ)
Engineering Experience
4+ Years
Education
California State University, Fresno
B.S. in Civil Engineering
Nelson Gomez
Nelson Gomez, EIT, is an Assistant Engineer at A&M
Consulting Engineers. He supports federally and state-funded transportation projects to Caltrans LAPM standards, assisting with PS&E production, quantities and cost estimates, signing/ striping plans, and traffic safety studies. Proficient in Civil 3D and Bluebeam, he maintains projects accurate and on schedule.

Colleagues rely on his steady follow-through and clear, can-do communication.

Assistant Engineer

Page 275 of 444 ends

Appendix A - Resumes
A&M 29
County of Tulare
Mooney Grove Dog Park
City of Selma
Branch Canal Parkway (ATP Cycle 6)
City of Selma
SR-99 Gateway to Downtown Revitalization Project
(Clean CA Local Grant Program)
City of Corcoran
Community Beautification & Cleanup
City of Parlier
Parlier Avenue Roundabout
City of Corcoran
2021 Pedestrian and Bicycle Improvements CMAQ
Phase 1 & 2
City of Parlier
Water Storage Tank Improvements
City of Parlier
Fig Tree Park (Urban Greening)
City of Parlier
Zediker & Zulma Crosswalk
City of Parlier
Sequoia Walkway
City of Lemoore
Bush Street Pedestrian Safety Improvements
(HSIP Cycle 10)
City of Parlier
Police Department Parking Lot Improvements
City of Parlier
Avila Sewer Improvements
Surveying Experience
10+ Years
Education
B.S. in Geomatics Engineering,
California State University, Fresno
Registration
Professional Land Surveyor,
State of California No. 9445
Daniel Cerda, PLS
Daniel Cerda, PLS, is A&M’s Professional Land Surveyor. He manages field and office surveying from scoping to closeout, delivering Records of Survey, boundary control, ALTA/NSPS and topographic maps for design. Daniel prepares legal descriptions and plats, leads utility investigations, and directs construction staking and as-built verification. Skilled with GNSS/total stations and 3D HDS scanning, he provides accurate data, clear
deliverables, and responsive coordination so engineers and contractors build with confidence and stay on schedule.

Professional Land Surveyor

Page 276 of 444 ends

Appendix A - Resumes
A&M 30
City of Parlier
Guardrail Improvements (HSIP Cycle 11)
City of Corcoran
Guardrail Improvements (HSIP Cycle 11)
City of Parlier
School Corridor Active Transportation Improvements
(ATP Cycle 6)
City of Parlier
Limitless Lane Network (ATP Cycle 6)
City of Corcoran
Equitable Health, Safety & Connectivity (ATP Cycle 6)
City of Selma
Branch Canal Parkway (ATP Cycle 6)
City of Parlier
Water Storage Tank Improvements
(Small Community Drought Relief Program)
City of Parlier
Tuolumne Street Pedestrian Safety Improvements
(HSIP Cycle 11)
City of Corcoran
Orange Avenue Pedestrian Facilities Improvements
(CDBG)
City of Parlier
Sequoia Walkway
City of Lemoore
Bush Street Pedestrian Safety Improvements
(HSIP Cycle 10)
City of Lemoore
Fox Street & 19th Avenue Roadway Repairs
Surveying Experience
5+ Years
Education
B.S. in Geomatics Engineering,
California State University, Fresno
Luis Lopez, LSIT
Luis Lopez, LSIT, is an Assistant Land Surveyor at A&M Consulting Engineers. He supports boundary and topographic surveys, Records of Survey, and construction staking, integrating GNSS/ RTK and total station workflows with clean CAD deliverables. Luis processes point clouds and imagery (Pix4D) and builds surfaces and exhibits in Civil 3D; he also applies ArcGIS Pro for mapping and QA. With strong data analysis skills (MATLAB) and modeling experience (Revit/Inventor), Luis turns field data into accurate, ready-to-build plans.

Assistant Land Surveyor

Page 277 of 444 ends

Appendix A - Resumes
A&M 31
Pedro Lopez, EIT
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer
Education: B.S. in Civil Engineering,
California State University, Fresno
Derian Gutierrez
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer
Education: B.S. in Civil Engineering,
California State University, Fresno
Kyndra Martinez
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer
Key Projects: Parlier Water Tank Improvements, City of
Parlier Guardrail Improvements (HSIP Cycle 11), and City of Parlier Flood Protection Project - Phase 2.

Education: B.S. in Civil Engineering,
California State University, Fresno
Edward Magana, EIT
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer
Key Projects: City of Lemoore Fox St & 19th Avenue
Roadway Repairs, City of Corcoran Guardrail
Improvements (HSIP Cycle 11).

Education: B.S. in Civil Engineering,
California State University, Fresno

Page 278 of 444 ends

A&M 32
Appendix A - Resumes
David Del Bosque
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer
Key Projects: City of Parlier Pedestrian Safety
Improvements, City of Parlier Basin Improvements Project.

Education: B.S. in Bioengineering,
University of California, Merced
Alexis Gutierrez
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer,
Construction Management
Education: B.S. in Civil Engineering,
California State University, Chico
Gonzalo Robledo
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer,
Construction Management
Education: B.S. in Construction Management,
California State University, Fresno
Samuel Mudford
Assistant Engineer - A&M Consulting Engineers
Role in Project: Assistant Engineer,
Construction Management
Education: B.S. in Physics,
University of California, Santa Cruz

Page 279 of 444 ends

A&M 33
Appendix A - Resumes
Graciela Aguilar
Administrative Specialist - A&M Consulting Engineers
Role in Project: Outreach Coordinator & Certified Payroll Specialist
Education: B.S. in Communications,
California State University, Bakersfield
Mary Espinosa
Administrative Specialist - A&M Consulting Engineers
Role in Project: Outreach & Grant Coordinator
Education: B.S. in Sociology,
University of California, Berkeley

Page 280 of 444 ends

A-1
A&M Consulting Engineers
EXHIBIT “A”
2026 HOURLY RATE SCHEDULE

CLASSIFICATION RATE
Principal ................................................................................................................ $200.00/Hour Grant Writer.......................................................................................................... $130.00/Hour Professional Engineer 3 ........................................................................................ $185.00/Hour Professional Engineer 2 ........................................................................................ $175.00/Hour Professional Engineer 1 ........................................................................................ $165.00/Hour Assistant Engineer 3 ............................................................................................. $140.00/Hour Assistant Engineer 2 ............................................................................................. $135.00/Hour Assistant Engineer 1 ............................................................................................. $120.00/Hour Professional Land Surveyor 2 ............................................................................... $180.00/Hour Professional Land Surveyor 1 ............................................................................... $175.00/Hour Assistant Land Surveyor....................................................................................... $145.00/Hour Environmental Consultant .................................................................................... $170.00/Hour Environmental, Health & Safety Officer .............................................................. $150.00/Hour Construction Engineer........................................................................................... $165.00/Hour Construction Observer ......................................................................................... $155.00/Hour Construction Administrator .................................................................................. $110.00/Hour Technical Assistance............................................................................................. $140.00/Hour Engineering Aide .................................................................................................. $110.00/Hour Survey Party Mobilization .................................................................................... $100.00/Hour 1-Man Survey Party .............................................................................................. $180.00/Hour 2-Man Survey Party .............................................................................................. $250.00/Hour 3-Man Survey Party .............................................................................................. $350.00/Hour LiDAR Scanner ..................................................................................................... $200.00/Hour Equipment Rental and Associated Expense .............................................................. Cost x 1.10 Materials, Printing, Subconsultant Procurement ....................................................... Cost x 1.10 Mileage ....................................................................................................... @ Current IRS Rate Note: A&M Consulting Engineers General Engineering Fee Schedule rates are subject to adjustment annually. Survey party and construction inspector rates are also subject to adjustment upon change in “Prevailing Rate” as determined by the Director of Industrial Relations, State of California. Fees include vehicle mileage unless specified.

Page 281 of 444 ends

RESOLUTION 26-72-R

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HANFORD

AWARDING A PROFESSIONAL SERVICES AGREEMENT TO A&M CONSULTING ENGINEERS, INC. FOR INTERIM CITY ENGINEER AND MUNICIPAL

ENGINEERING SERVICES FOR A TWO-YEAR TERM IN AN AMOUNT NOT TO EXCEED $360,000, WITH AN OPTION TO EXTEND SERVICES ON AS-NEEDED BASIS AND DESIGNATING A&M CONSULTING ENGINEERS, INC. TO PERFORM

THE DUTIES OF CITY ENGINEER UNTIL THE CITY ENGINEER POSITION IS

FILLED, AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE

AGREEMENT
At a regular meeting of the City Council of the City of Hanford duly called and held on October 20, 2026, at 7:00 p.m. in the Council Chambers of the Civic Auditorium, it was moved by Council Member ____________, and seconded by Council Member ____________, and duly carried, that the following resolution be adopted:

WHEREAS, the City Engineer is the licensed civil engineer responsible for the engineering functions of the City, including approval of plans, maps, encroachment and utility permits, interpretation of the City’s engineering standards, and oversight of the City’s capital improvement program, and the budgeted City Engineer classification is currently vacant while the City recruits to fill it; and
WHEREAS, the City is carrying a capital improvement program with near-term, grantdriven funding and delivery deadlines, including Measure H, Proposition 68, and federally funded projects and the annual National Pollutant Discharge Elimination System permit filing, and an interruption in engineering oversight during the recruitment would place grant schedules, reimbursement eligibility, and construction windows at risk; and WHEREAS, on June 8, 2026, A&M Consulting Engineers, Inc. (“A&M”), a California corporation, submitted a Statement of Qualifications for On-Call Staff Augmentation for Project Management Services to the Utilities and Engineering Department, which the Department reviewed and found to demonstrate the competence and professional qualifications necessary for the services, consistent with Government Code Section 4526; and WHEREAS, on August 11, 2026, the Utilities and Engineering Director issued a Sole Source Justification pursuant to Sections D.1, E.5, and E.8 of the City of Hanford Purchasing Policy, and on September 1, 2026, the City Manager, within his authority under Section A.5 of the Purchasing Policy, executed Task Order No. 1 with A&M for Contract City Engineer and Municipal Engineering Services on a time-and-materials basis in an amount not to exceed $49,999.00, issued under Purchase Order No. 22700383, for a term through October 31, 2026, or until formal procurement of continuing services is finalized, whichever occurs first; and WHEREAS, A&M has performed the City Engineer function and capital project oversight under Task Order No. 1 since September 1, 2026, and Task Order No. 1 provides that amounts paid thereunder shall be credited against a successor agreement for the same services; and

Page 282 of 444 ends

WHEREAS, Section A.5 of the Purchasing Policy requires City Council approval of purchases of $50,000 or greater, and Section F.2.D prohibits splitting a contract to evade contract dollar limitations; and
WHEREAS, Government Code Section 37103 authorizes the City to contract with a specially trained and experienced person, firm, or corporation for special services and advice in engineering matters; and
WHEREAS, the Utilities and Engineering Department has verified that a good faith search for alternatives has been made, has found that no other firm approached was able to provide the combination of interim City Engineer capacity, project management across an active multi-funding capital program, and availability on the timeline the City requires, and has found that the engineering firms presently under contract with the City as design consultants of record would be subject to a review-of-own-work condition if assigned oversight of their own projects; and WHEREAS, the proposed Professional Services Agreement (the “Agreement”), attached hereto as Exhibit A, provides for interim City Engineer, project management and oversight, and as-requested design and construction management services on a time-and-materials basis in accordance with the A&M 2026 Hourly Rate Schedule, in an amount not to exceed $360,000 over a two-year term or until the City Engineer position is filled and the City provides written notice, whichever occurs first, billed to and reimbursed from local funds only; and WHEREAS, the Agreement establishes A&M as an independent contractor, provides that the City contracts with the firm and not with any individual, provides that no A&M personnel are appointed to, placed in, or compensated through the City Engineer classification or eligible for enrollment in the California Public Employees’ Retirement System or any other benefit of City employment, and requires A&M to indemnify the City against any employment-classification claim, assessment, contribution, or penalty; and
WHEREAS, the performance of the duties of City Engineer requires that the City designate a California-licensed civil engineer to exercise the signature and approval authority attaching to that office; and
WHEREAS, award of a professional services agreement for engineering and administrative services is not a project under the California Environmental Quality Act pursuant to Section 15378(b)(5) of the CEQA Guidelines, and each capital project overseen under the Agreement is subject to its own environmental review; and WHEREAS, the City Council of the City of Hanford, at a regular meeting on October 20, 2026, reviewed the staff report, the Sole Source Justification, and the Agreement, and finds that award of the Agreement on a sole source basis is in the best interest of the City.

THEREFORE, BE IT RESOLVED that the City Council of the City of Hanford hereby finds and determines as follows:

1. That the recitals set forth above are true and correct and are incorporated herein by this reference.

Page 283 of 444 ends

2. That the services to be provided under the Agreement are special services in engineering matters within the meaning of Government Code Section 37103, and that A&M Consulting Engineers, Inc. is specially trained and experienced and competent to perform them.

3. That a sole source award to A&M Consulting Engineers, Inc. is justified under Section E.8 of the City of Hanford Purchasing Policy on the basis of continuity of the City Engineer function during the recruitment, the qualifications demonstrated in the June 8, 2026 Statement of Qualifications, the good faith search for alternatives documented in the Sole Source Justification, the timing of the City’s need, and the reasonableness of the time-andmaterials compensation against A&M’s published 2026 Hourly Rate Schedule.

4. That the award is a single, successor authorization to Task Order No. 1 and is not a splitting of a contract within the meaning of Section F.2.D of the Purchasing Policy.

NOW, THEREFORE, BE IT FURTHER RESOLVED, that the City Council of the City of Hanford hereby:

1. Awards a sole source Professional Services Agreement to A&M Consulting Engineers, Inc. for Interim City Engineer and Municipal Engineering Services for a two-year term in an amount not to exceed $360,000, substantially in the form attached as Exhibit A.

2. Authorizes the City Manager to execute the Agreement on behalf of the City, in a form approved by the City Attorney, and to execute such further documents and take such further actions as are necessary to carry out the Agreement, provided that no amendment may increase the not-to-exceed amount or extend the term without further action of the City Council.

3. Designates A&M Consulting Engineers, Inc. to perform the duties of City Engineer for the term of the Agreement or until the City Engineer position is filled, whichever occurs first, and authorizes the Utilities and Engineering Director to confer on A&M’s designated California-licensed civil engineer, and on one designated alternate approved in writing by the Director, the signature and approval authority attaching to the office of City Engineer under the Hanford Municipal Code, the Public Works Improvement Standards, the Subdivision Map Act, and applicable State law, including authority to sign maps, plans, permits, and certifications requiring the City Engineer’s signature. The designated individual and alternate shall be identified in all correspondence as performing City Engineer duties on behalf of A&M Consulting Engineers, Inc., shall file Statements of Economic Interests as consultants under the City’s Conflict of Interest Code and Government Code Section 82019, and shall exercise only the authority expressly conferred hereunder. Nothing in this designation appoints any individual to City employment or to the City Engineer classification.

4. Directs that amounts paid to A&M Consulting Engineers, Inc. under Task Order No. 1 and Purchase Order No. 22700383 be credited against the not-to-exceed amount of the Agreement, and that Task Order No. 1 terminate upon execution of the Agreement.

5. Directs that all services under the Agreement be billed to and reimbursed from local funds, and that no cost under the Agreement be submitted for federal reimbursement unless and

Page 284 of 444 ends

until the services have been procured in accordance with 23 U.S.C. 112(b)(2), 2 CFR 200.320, and the Caltrans Local Assistance Procedures Manual and approved by Caltrans.

Passed and adopted at a regular meeting of the City Council of the City of Hanford duly called and held on October 20, 2026, by the following vote:

AYES: _______________________________________________________________________ NOES: _______________________________________________________________________ ABSTAIN: __________________________________________________________________ ABSENT: ___________________________________________________________________ APPROVED: __________________________

MARK KAIRIS
MAYOR of the City of Hanford
ATTEST: ____________________________

NATALIE CORRAL

CITY CLERK

STATE OF CALIFORNIA )
COUNTY OF KINGS ) ss

CITY OF HANFORD )
I, NATALIE CORRAL, City Clerk of the City of Hanford, do hereby certify the foregoing Resolution was duly passed and adopted at a regular meeting of the City Council of the City of Hanford held on the 20th day of October, 2026.

Date: _________________
____________________________________

NATALIE CORRAL

CITY CLERK

Page 285 of 444 ends

Exhibit A
Professional Services Agreement – Interim City Engineer and Municipal Engineering Services (with Exhibit A-1, A&M Consulting Engineers 2026 Hourly Rate Schedule)

Page 286 of 444 ends

12.F.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: CONSENT CALENDAR SUBJECT:

Adopt Resolution 26-72-R authorizing submittal of Highway Safety Improvement Program (HSIP) Cycle 13 grant applications for three safety projects seeking $1,980,000 in grant funds; approve an immediate appropriation of $40,000 from the TDA Fund (0050) for grant writing and application support services by A&M Consulting Engineers, Inc.; and, contingent upon grant award, amend the budget to recognize the grant revenue and appropriate the remaining $2,210,000 for the projects from the TDA Fund (0050), including a local match not to exceed $230,000.

RECOMMENDATION:

Recommendation:

It is recommended that the City Council, by motion;

1. Adopt Resolution 26-72-R authorizing the Utilities and Engineering Department to submit applications to the California Department of Transportation (Caltrans) for Highway Safety Improvement Program (HSIP) Cycle 13 funding for three projects: a Pedestrian Crossing Enhancements set-aside application; a Bike Safety Improvements set-aside application for Florinda Street; and a competitive Benefit-Cost Ratio application for citywide signal, signing, and striping safety upgrades, including alternative configurations of the competitive application, seeking a total of $1,980,000 in HSIP grant funds;

2. Approve an immediate appropriation of $40,000 from the TDA Fund (0050) for grant writing and application support services by A&M Consulting Engineers, Inc., including a $5,000 contingency;

3. Contingent upon grant award, amend the budget to recognize the grant revenue and appropriate the remaining $2,210,000 for the projects from the TDA Fund (0050), including a local match not to exceed $230,000;

4. Authorize the City Manager or designee to sign and submit the applications, the Local Roadway Safety Plan certification, and related application documents; and

5. Authorize the City Manager to approve changes and/or change orders as necessary within the approved project budget.

Recommended Motion:

I make a motion to:

Page 287 of 444 ends

1. Adopt Resolution 26-72-R authorizing the Utilities and Engineering Department to submit applications to the California Department of Transportation (Caltrans) for Highway Safety Improvement Program (HSIP) Cycle 13 funding for three projects: a Pedestrian Crossing Enhancements set-aside application; a Bike Safety Improvements set-aside application for Florinda Street; and a competitive Benefit-Cost Ratio application for citywide signal, signing, and striping safety upgrades, including alternative configurations of the competitive application, seeking a total of $1,980,000 in HSIP grant funds;

2. Approve an immediate appropriation of $40,000 from the TDA Fund (0050) for grant writing and application support services by A&M Consulting Engineers, Inc., including a $5,000 contingency;

3. Contingent upon grant award, amend the budget to recognize the grant revenue and appropriate the remaining $2,210,000 for the projects from the TDA Fund (0050), including a local match not to exceed $230,000;

4. Authorize the City Manager or designee to sign and submit the applications, the Local Roadway Safety Plan certification, and related application documents; and

5. Authorize the City Manager to approve changes and/or change orders as necessary within the approved project budget.

BACKGROUND:

Staff requests City Council’s authorization to pursue $1.98M in grant funding and, if awarded to amend the budget to recognize the grant award and to appropriate $2,250,000, which includes a 10% local city match of $230,000 and $40,000 for grant writing services and contingency. A detailed appropriation breakdown is included in the Fiscal Impact Section below.

HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 13
The Highway Safety Improvement Program is a federal-aid program, administered in California by the Caltrans Division of Local Assistance, that funds proven, low-cost safety countermeasures to reduce fatal and serious-injury crashes on local roads. Caltrans released the Cycle 13 call for projects on July 1, 2026, and applications are due Monday, November 2, 2026. Approximately $370 million is available statewide: $306 million for competitive Benefit-Cost Ratio (BCR) applications and $64 million in five funding set-asides.

HSIP reimburses up to 90 percent of eligible project costs for the countermeasures proposed in this report, and the City provides the remaining 10 percent of total project cost as its local match. Caltrans posts the list of selected projects approximately three to four months after the application deadline, so awards are expected in early 2027. Selected projects must reach the preliminary engineering milestone within nine months of the cycle start date (when HSIP funds are used for design), and construction authorization within three years (three and one-half years when a consultant performs the design).

To apply, an agency must have a Local Roadway Safety Plan (LRSP) completed within the last five years. The City’s LRSP, finalized in May 2023, satisfies this requirement through May 2028, and the City will self-certify the plan with each application.

SET-ASIDE AND COMPETITIVE APPLICATIONS
Cycle 13 offers two routes to funding, and staff recommends using both:
• Funding set-asides – more direct awards. Set-aside applications do not require a benefit-cost analysis. Each agency may submit one application per set-aside, capped at $360,000 in HSIP funds for the Pedestrian Crossing Enhancements and Bike Safety

Page 288 of 444 ends

Improvements set-asides. When requests exceed the funds available, Caltrans selects in priority order, starting with agencies that received no HSIP awards in Cycles 11 and 12.

Caltrans’ approved project lists for those cycles include no City of Hanford projects, so the City is in the first-priority group, which makes the two set-aside applications the most direct path to an award. In Cycle 12, Avenal, Corcoran, and Lemoore each received $315,000 Pedestrian Crossing Enhancements set-aside awards, and Avenal and Lemoore each received $315,000 Bike Safety Improvements set-aside awards. • Benefit-Cost Ratio applications – competitive awards. BCR applications compete statewide and are funded in descending order of their benefit-cost ratio, calculated with the Caltrans HSIP Analyzer from each location’s crash history, the crash reduction expected from each countermeasure, and project cost. A ratio of at least 5.0 is required to apply. The funding cutoff is not known until selection is complete, and an agency may be awarded up to $10 million.

SAFETY NEED IDENTIFIED IN THE LOCAL ROADWAY SAFETY PLAN The LRSP analyzed 1,669 reported crashes on City streets from 2015 through 2019, including 7 fatal and 56 severe-injury crashes – a combined average of 12.6 fatal and severe-injury crashes per year.

Sixty-six percent of all crashes occurred at intersections, and broadside collisions were the most common type (38.5 percent). Seventy-four crashes involved pedestrians; in 39 percent of them, a driver failed to yield to a pedestrian in a crosswalk. Sixty-seven crashes involved bicyclists, and 39 percent of those involved a bicyclist riding on the wrong side of the road. In the Office of Traffic Safety’s 2019 rankings, Hanford ranked 30th of 105 California cities of similar size for pedestrians killed and injured, where first is worst. The City’s Active Transportation Plan (February 2025) recorded 48 bicycle and pedestrian collisions from 2018 through 2022, in which five people were killed.

The LRSP established five emphasis areas – intersection safety, speed management, pedestrian safety, wrong-side bicycle riding, and impaired driving – and its Table 9 packages HSIP-ready intersection projects with locations, countermeasures, costs, and benefit-cost ratios. Staff screened the LRSP projects and emphasis areas against the Cycle 13 program rules and cross-referenced them with the project lists in the Active Transportation Plan to select the applications with the strongest safety basis and the best fit to each funding category.

PROPOSED APPLICATIONS

1. Pedestrian Crossing Enhancements (set-aside). Upgrade pedestrian crossings at five signalized intersections that LRSP Table 9 lists for leading pedestrian intervals because pedestrian or bicycle crashes occurred there, and that the Active Transportation Plan also lists as Tier 1 “Urgent Action” pedestrian sites: 11th Avenue at Lacey Boulevard, at Davis Street, and at Seventh Street; and 10th Avenue at Grangeville Boulevard and at Lacey Boulevard/Seventh Street. The work includes leading pedestrian intervals, which give pedestrians a three- to seven-second head start before parallel vehicle traffic receives a green light; pedestrian countdown signal heads where missing; and high-visibility crosswalk markings with advance stop lines.

Safety benefit: The LRSP credits a leading pedestrian interval with a 60 percent reduction in pedestrian and bicycle crashes and countdown signal heads with a 25 percent reduction.

These five intersections recorded 72 crashes in the LRSP study period, eight of them involving a pedestrian or bicyclist. 11th Avenue and Lacey Boulevard had the most crashes of any signalized intersection in the LRSP (29 crashes, 18 with injuries) and the most bicycle and pedestrian collisions in the Active Transportation Plan; 10th Avenue and Grangeville Boulevard had the highest severity-weighted crash score of any signalized

Page 289 of 444 ends

intersection analyzed in the LRSP, including one fatal crash; and the Active Transportation Plan records a pedestrian fatality at 10th Avenue and Lacey Boulevard. The application will request the set-aside maximum of $360,000 in HSIP funds ($400,000 total project cost; $40,000 City match), with the number of crossings sized to fit. Work at 10th Avenue and Lacey Boulevard/Seventh Street will be coordinated with the City’s federally funded Lacey Boulevard Complete Streets project so that no work is funded twice.

2. Bike Safety Improvements, Florinda Street (set-aside). Install bicycle lanes on Florinda Street from 11th Avenue to 9-1/4 Avenue, approximately 1.8 miles: Class II bike lanes from 11th Avenue to 10th Avenue and Class II buffered bike lanes from 10th Avenue to 9-1/4 Avenue, with bike lane signing and the “wrong way” signs on the back of bike lane signs that the LRSP recommends. Both segments are Tier 1 Backbone projects in the Active Transportation Plan. Staff ranked five Active Transportation Plan corridors eligible for this set-aside against the LRSP crash data, and Florinda Street ranked third. The two higherranked corridors, Hanford-Armona Road and Grangeville Boulevard between 12th Avenue and 10th Avenue, have stronger segment crash histories but are estimated at or near the set-aside limit before cost escalation. Florinda Street fits well inside the limit and leaves room for escalation and contingency.

Safety benefit: Bike lanes give bicyclists a marked space in the direction of travel and directly address LRSP Emphasis Area 4, wrong-side bicycle riding. The corridor begins at 11th Avenue and Florinda Street/Rodgers Road, the signalized intersection with the second-most crashes in the LRSP (27 crashes, including two bicycle crashes), and crosses the Douty Street and Florinda Street signal, which is also an LRSP high-risk location. The Active Transportation Plan’s low-range estimate for the two segments is $264,250 in 2024 dollars (its high range, $1,083,250, reflects broader street work); the striping and signing-only scope proposed here is expected to fall at the low end.

Escalated, the total project cost is estimated at approximately $300,000 ($270,000 HSIP; $30,000 City match). Existing striping and curb-to-curb width will be confirmed in the field before the application is finalized.

3. Citywide Signal, Signing, and Striping Safety Upgrades (competitive BCR). This application combines LRSP Projects 1 and 2 into one systemic application. At up to 21 signalized intersections, it installs near-side signal heads and retroreflective backplates (when the LRSP was prepared, only two of these signals had near-side heads and none had backplates), improves signal timing, including yellow and all-red intervals, coordination, and phasing, and adds leading pedestrian intervals at the remaining LRSP locations where pedestrian or bicycle crashes occurred. At nine stop-controlled intersections, it installs larger or additional stop and warning signs, upgraded pavement markings, and intersection lighting where night crashes occurred and lighting is not present.

Safety benefit: These 30 locations accounted for 359 of the City’s 1,669 reported crashes (about 22 percent) in the LRSP study period. The LRSP credits signal hardware and signal timing improvements with a 15 percent reduction in all crash types each, upgraded intersection pavement markings with 25 percent, larger or additional signs with 15 percent, and intersection lighting with a 40 percent reduction in night crashes. The LRSP estimated the two projects at $1,284,273 in 2023 dollars, including design, environmental, contingency, and construction management, with benefit-cost ratios of 20.02 and 18.77.

Escalated to anticipated construction-year costs, the package is estimated at approximately $1,500,000 ($1,350,000 HSIP; $150,000 City match).

The ratio for the competitive application will be recalculated in the HSIP Analyzer with 2023–2025 crash data. Locations that fall below the 5.0 minimum will be removed, and additional signalized

Page 290 of 444 ends

locations may be added where they improve the overall ratio, as the LRSP anticipates. Cycle 13 also allows a systemic project to be submitted in more than one configuration, such as the full package and a higher-ratio subset, to improve its chance of selection; Caltrans funds the project once, at its highest-ratio configuration that clears the cutoff. The set-aside and competitive applications are scoped so that no work item is included in more than one application.

JUSTIFICATION FOR THE COMPETITIVE APPLICATION
The set-aside applications are capped at $360,000 each in HSIP funds. The competitive BCR application is the only route to funding at the scale of the LRSP’s intersection projects. Unlike the setasides, it is competitively awarded statewide. Staff recommends pursuing it for the following reasons:

1. The project is already defined. LRSP Projects 1 and 2 identify the locations, countermeasures, costs, and benefit-cost ratios. The application work is updating crash data and costs, not developing a new project.

2. The ratios are strong. The LRSP’s ratios of 20.02 and 18.77 are about four times the program minimum of 5.0. The ratios will change when they are recalculated with current crash data, but the margin above the minimum is substantial.

3. Program changes favor this project. Caltrans confirmed in its July 21, 2026 Cycle 13 webinar that signal timing improvements, a core element of the package, now reimburse at 90 percent, up from the 50 percent assumed in the LRSP. Under the prior rule the lower ratio would have applied to the whole project; under Cycle 13 the full package reimburses at 90 percent.

4. Low cost and quick delivery. Signal heads, backplates, timing changes, signs, and markings are installed within the existing right-of-way and can be delivered well within the HSIP delivery deadlines.

5. Limited downside. Adding the BCR application increases the application cost by approximately $7,000 to $10,000 for a chance at approximately $1.35 million in federal funds. If the project is not selected, no match is required, and the updated crash analysis positions the City for the next HSIP cycle.

OTHER SET-ASIDES CONSIDERED
Staff also screened the Lane Departure Prevention and Guardrail Upgrades set-asides. The LRSP does not define a project for either category, and staff does not recommend applying to them in this cycle.

NEXT STEPS
Following Council action, staff will complete the 2023–2025 crash data update, field-verify existing conditions, prepare the HSIP Analyzer files, cost estimates, application forms, and Engineer’s Checklists, and submit the applications through Caltrans’ Smartsheet submittal system by October 30, 2026, ahead of the November 2 deadline. If any project is selected, staff will return to the City Council to accept the award and appropriate the local match.

ENVIRONMENTAL REVIEW
Submittal of grant applications is not a project under the California Environmental Quality Act (CEQA Guidelines Section 15378(b)(4)) because it is a government fiscal activity that does not commit the City to any specific project. If funded, each project will be reviewed under CEQA and, through Caltrans, under the National Environmental Policy Act before construction. The proposed improvements are within existing right-of-way and are anticipated to qualify for categorical exemptions and exclusions.

Page 291 of 444 ends

FISCAL IMPACT:

Cost to apply. The cost to prepare and submit the three applications is estimated at $27,000 to $35,000: approximately $20,000 to $25,000 for the two set-aside applications and $7,000 to $10,000 more for the competitive BCR application, which requires the benefit-cost analysis. The work will be performed by A&M Consulting Engineers, Inc. on a time & material basis under the City’s agreement for Interim City Engineer. Sufficient funds are available within the Department’s Fiscal Year 2026-27 adopted budget under TDA Fund (0050). Application costs are not reimbursable by HSIP and are incurred whether or not a project is selected.

Matching funds if awarded. HSIP reimburses up to 90 percent of eligible project costs, and the City’s match is the remaining 10 percent of total project cost. Each dollar of City match brings nine dollars of HSIP funding. If awarded, the projects and matching funds would be:
• Pedestrian Crossing Enhancements (set-aside): total project cost $400,000; HSIP $360,000; City match $40,000.
• Bike Safety Improvements, Florinda Street (set-aside): total project cost approximately $300,000; HSIP $270,000; City match $30,000, rising to no more than $40,000 if costs reach the set-aside limit.
• Citywide Signal, Signing, and Striping Safety Upgrades (competitive): total project cost approximately $1,500,000; HSIP $1,350,000; City match $150,000. • All three awarded: approximately $2,200,000 in safety improvements, of which $1,980,000 is HSIP funding and $220,000 is City match. The resolution commits up to $230,000 so that both set-asides are covered at their limits. If only the two set-aside projects are awarded, the City match would be $70,000 to $80,000.

The appropriation request is itemized as follows:

Total Grant Fund Request: $1,980,000
10% Local Match: $230,000
Estimated Application Costs including $5,000
contingency (A&M Consulting Engineers):
$40,000
Total Appropriation Request: $2,250,000
No matching funds would be spent in Fiscal Year 2026-27. Awards are expected in early 2027, design would begin in Fiscal Year 2027-28, and construction would follow within the HSIP delivery deadlines.

If awarded, the budget would be amended to recognize the receipt of $1,980,000 in grant funds. The appropriation would authorize the immediate appropriation of $40,000 in TDA Funds (0050) for grant application services that includes a $5,000 contingency.

The match would be programmed in the Capital Improvement Program for those years from eligible local transportation funds, such as TDA, Gas Tax or SB 1 Road Maintenance and Rehabilitation Account funds, as determined with the Finance Department. Caltrans has confirmed that City staff time can be credited toward the local share as soft match, documented in the project finance letter, which would reduce the cash match. HSIP pays only up to the awarded amount, and costs above it are the City’s responsibility; staff will include escalation and contingency in the application estimates

Page 292 of 444 ends

to manage this risk. Acceptance of any award and appropriation of the match will return to the City Council.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Hanford HSIP Cycle13 Vicinity Map

2. Hanford HSIP Cycle13 Project Location Map

3. Resolution 26-73-R HSIP Grant

Page 293 of 444 ends

CITY OF HANFORD
Utilities and Engineering Department
October 20, 2026 Council Meeting
HSIP CYCLE 13 VICINITY MAP
Kings County, California
LEGEND
Hanford City Limits
Project area
Shown in detail on the Project Location Map
State highway
Section-line arterial
Pedestrian Crossing set-aside (5)
Bike Safety set-aside (Florinda St)
Competitive BCR sites (30)
Signalized (circle) and stop-controlled (square)
Planning exhibit only - not a survey.

City limits: City of Hanford GIS (ArcGIS Online),
simplified for display. Highways and streets drawn
schematically from Esri World Geocoding reference
points; alignments approximate.
198
198
43 43
N

Page 294 of 444 ends

CITY OF HANFORD Utilities and Engineering Department
October 20, 2026 Council Meeting
HSIP CYCLE 13 PROJECT LOCATIONS
LEGEND
Pedestrian Crossing Enhancements
Set-aside: LPI, countdown heads, crosswalks (5 signals) Bike Safety Improvements
Set-aside: Florinda St, 11th Ave to 9-1/4 Ave (1.8 mi)
Signalized intersection
Competitive BCR: signal heads, backplates, timing
Stop-controlled intersection
Competitive BCR: signs, markings, lighting
Arterial street
LOCATION INDEX (LRSP Table 9 order)
1 11th & Lacey *
2 11th & Florinda/Rodgers
3 12th & Lacey
4 11th & Han.-Armona
5 11th & Grangeville
6 10th & Grangeville *
7 12th & Centennial/Mall
8 11th & Fargo
9 Grangeville & Redington
10 11th & Elm
11 Lacey & Mall
12 11th & Davis *
13 Grangeville & Rodgers
14 Grangeville & University
15 Douty & Florinda
16 Douty & Fargo
17 11th & Seventh *
18 11th & Cortner
19 10th & Lacey/7th *
20 Douty & Grangeville
21 10th & Fargo
22 12th & Glendale
23 Sixth & Phillips
24 Douty & Third
25 11th & Sixth
26 Douty & Center
27 Park & Ivy
28 Fargo & Glacier
29 11th & Pepper
30 10th & Second
* Also in the Pedestrian Crossing set-aside application.

Competitive-application sites are candidates from LRSP Table 9; sites below a benefit-cost ratio of 5.0 will be dropped once the HSIP Analyzer is rerun with current crash data.

Planning exhibit only - not a survey. Locations approximate; streets drawn schematically. Intersections: Esri World Geocoding.

Sources: Hanford LRSP (2023); Hanford ATP (2025).
1 2
3 4
5 6
7 8
9 10
11 12
14 13
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
N

Page 295 of 444 ends

RESOLUTION 26-73-R

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HANFORD

AUTHORIZING SUBMITTAL OF HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 13 GRANT APPLICATIONS FOR THREE SAFETY PROJECTS,

COMMITTING LOCAL MATCHING FUNDS IN AN AMOUNT NOT TO EXCEED $230,000 CONTINGENT UPON AWARD, AND AUTHORIZING THE CITY

MANAGER TO EXECUTE THE APPLICATIONS
At a regular meeting of the City Council of the City of Hanford duly called and held on October 20, 2026, at 7:00 p.m. in the Council Chambers of the Civic Auditorium, it was moved by Council Member ____________, and seconded by Council Member ____________, and duly carried, that the following resolution be adopted:

WHEREAS, the Highway Safety Improvement Program (“HSIP”) is a federal-aid program administered in California by the California Department of Transportation (“Caltrans”), Division of Local Assistance, that funds proven safety countermeasures to reduce fatal and seriousinjury crashes on local roads; and WHEREAS, on July 1, 2026, Caltrans issued the HSIP Cycle 13 call for projects, with applications due November 2, 2026, providing approximately $306 million for competitive Benefit-Cost Ratio applications and $64 million through funding set-asides, including the Pedestrian Crossing Enhancements and Bike Safety Improvements set-asides, each limited to one application and $360,000 in HSIP funds per agency; and
WHEREAS, HSIP reimburses up to 90 percent of eligible project costs for the safety countermeasures proposed by the City, the applicant agency provides the remaining local share, and HSIP reimbursement is limited to the amount awarded; and WHEREAS, an agency applying for HSIP funds must have completed a Local Roadway Safety Plan or its equivalent within the preceding five years and must self-certify the plan with each application, and the City’s Local Roadway Safety Plan (“LRSP”) was finalized in May 2023; and
WHEREAS, the LRSP analyzed 1,669 reported crashes on City streets from 2015 through 2019, including 7 fatal and 56 severe-injury crashes, established emphasis areas that include intersection safety, pedestrian safety, and wrong-side bicycle riding, and identified signalized and unsignalized intersection safety projects for HSIP funding; and WHEREAS, the City’s Active Transportation Plan (February 2025) identifies Tier 1 pedestrian improvement sites and a Tier 1 bikeway backbone network, including bicycle lanes on Florinda Street; and
WHEREAS, the Utilities and Engineering Department screened the LRSP and the Active Transportation Plan against the HSIP Cycle 13 program requirements and recommends that the

Page 296 of 444 ends

City apply for funding for the three projects described in Exhibit A (collectively, the “Projects”); and
WHEREAS, the first Project, Pedestrian Crossing Enhancements, would install leading pedestrian intervals, pedestrian countdown signal heads, and high-visibility crosswalk markings at five signalized intersections that the LRSP lists for leading pedestrian intervals and the Active Transportation Plan lists as Tier 1 pedestrian sites, and would be submitted under the Pedestrian Crossing Enhancements set-aside; and
WHEREAS, the second Project, Bike Safety Improvements, would install Class II and Class II buffered bicycle lanes on Florinda Street from 11th Avenue to 9-1/4 Avenue, a Tier 1 corridor in the Active Transportation Plan that addresses the LRSP’s wrong-side bicycle riding emphasis area, and would be submitted under the Bike Safety Improvements set-aside; and WHEREAS, the third Project, Citywide Signal, Signing, and Striping Safety Upgrades, would combine LRSP Projects 1 and 2 to upgrade signal hardware and timing at up to 21 signalized intersections and signing, pavement markings, and lighting at nine stop-controlled intersections, and would be submitted as a competitive Benefit-Cost Ratio application, which the Cycle 13 application instructions allow to be submitted in more than one configuration; and WHEREAS, Caltrans gives first priority for set-aside funding to agencies that received no HSIP awards in Cycles 11 and 12, and the City received no HSIP awards in those cycles; and WHEREAS, the local match for each Project is 10 percent of total project cost, estimated at $220,000 in the aggregate if all three Projects are awarded, and a commitment not to exceed $230,000 covers each set-aside Project at the set-aside limit; and WHEREAS, submittal of grant applications is not a project under the California Environmental Quality Act pursuant to Section 15378(b)(4) of the CEQA Guidelines because it is a government fiscal activity that does not involve any commitment to any specific project, and each Project, if funded, will be subject to environmental review under the California Environmental Quality Act and the National Environmental Policy Act before construction; and WHEREAS, the City Council of the City of Hanford, at a regular meeting on October 20, 2026, reviewed the staff report and finds that submittal of the applications and commitment of the local match are in the best interest of the City.

THEREFORE, BE IT RESOLVED that the City Council of the City of Hanford hereby finds and determines as follows:

1. That the recitals set forth above are true and correct and are incorporated herein by this reference.

2. That the Projects are consistent with, and implement safety improvements identified in, the City’s Local Roadway Safety Plan and Active Transportation Plan.

3. That submittal of the applications is not a project under the California Environmental Quality Act pursuant to Section 15378(b)(4) of the CEQA Guidelines.

Page 297 of 444 ends

NOW, THEREFORE, BE IT FURTHER RESOLVED, that the City Council of the City of Hanford hereby:

1. Authorizes the Utilities and Engineering Department to prepare and submit applications to Caltrans for HSIP Cycle 13 funding for the Projects described in Exhibit A, including alternative configurations of the Citywide Signal, Signing, and Striping Safety Upgrades application.

2. Authorizes the City Manager, or designee, to sign and submit the applications, the Local Roadway Safety Plan certification, and such other documents as Caltrans requires for the applications.

3. Commits local matching funds equal to 10 percent of total project cost for each Project selected for HSIP funding, in an aggregate amount not to exceed $230,000, contingent upon award.

4. Directs that the local match for any awarded Project be programmed in the Capital Improvement Program for the fiscal years in which the Project is delivered, from eligible local transportation funds identified by the Finance Department.

5. Directs staff to return to the City Council to accept any HSIP award and to appropriate the local match, and provides that any local funding for a Project in excess of the amounts committed herein shall require further action of the City Council.

Passed and adopted at a regular meeting of the City Council of the City of Hanford duly called and held on October 20, 2026, by the following vote:

AYES: _______________________________________________________________________ NOES: _______________________________________________________________________ ABSTAIN: __________________________________________________________________ ABSENT: ___________________________________________________________________ APPROVED: __________________________

MARK KAIRIS
MAYOR of the City of Hanford
ATTEST: ____________________________

NATALIE CORRAL

CITY CLERK

Page 298 of 444 ends

STATE OF CALIFORNIA )
COUNTY OF KINGS ) ss

CITY OF HANFORD )
I, NATALIE CORRAL, City Clerk of the City of Hanford, do hereby certify the foregoing Resolution was duly passed and adopted at a regular meeting of the City Council of the City of Hanford held on the 20th day of October, 2026.

Date: _________________
____________________________________

NATALIE CORRAL

CITY CLERK

Page 299 of 444 ends

Exhibit A
HSIP Cycle 13 Projects

1. Pedestrian Crossing Enhancements
Funding category: Pedestrian Crossing Enhancements set-aside Locations: 11th Avenue at Lacey Boulevard, at Davis Street, and at Seventh Street; and 10th Avenue at Grangeville Boulevard and at Lacey Boulevard/Seventh Street Scope: Leading pedestrian intervals, pedestrian countdown signal heads where missing, and high-visibility crosswalk markings with advance stop lines Estimated total project cost: $400,000 (HSIP request $360,000; City match $40,000)

2. Bike Safety Improvements, Florinda Street
Funding category: Bike Safety Improvements set-aside
Limits: Florinda Street, 11th Avenue to 9-1/4 Avenue, approximately 1.8 miles Scope: Class II bike lanes from 11th Avenue to 10th Avenue and Class II buffered bike lanes from 10th Avenue to 9-1/4 Avenue, with bike lane signing and wrong-way signs Estimated total project cost: approximately $300,000 (HSIP request $270,000; City match $30,000, not to exceed $40,000)

3. Citywide Signal, Signing, and Striping Safety Upgrades Funding category: Benefit-Cost Ratio (competitive); may be submitted in more than one configuration
Locations: Up to 21 signalized intersections and nine stop-controlled intersections identified in LRSP Table 9 (Projects 1 and 2), as refined in the HSIP Analyzer Scope: Near-side signal heads, retroreflective backplates, signal timing improvements, and leading pedestrian intervals at signalized intersections; larger or additional signs, upgraded pavement markings, and intersection lighting at stop-controlled intersections Estimated total project cost: approximately $1,500,000 (HSIP request $1,350,000; City match $150,000)
All three Projects: approximately $2,200,000 in total project cost, of which $1,980,000 is HSIP funding and $220,000 is City match. The City match committed by this Resolution shall not exceed $230,000.

Cost estimates are planning-level and will be finalized in the Caltrans HSIP Analyzer before the applications are submitted.

Page 300 of 444 ends

12.G.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: CONSENT CALENDAR SUBJECT:

Authorization to reimburse Consolidated Electrical Distributors, Inc., DBA Medallion Supply Hanford, lessee of City-owned property at 426 W. Lacey Boulevard, in the amount of $127,347 for building system repairs as required under the existing lease agreement and appropriate $127,347 from the Accumulated Capital Outlay Fund (0004)
RECOMMENDATION:

Recommendation: That the City Council, by motion, authorize the reimbursement to Consolidated Electrical Distributors, Inc., DBA Medallion Supply Hanford, lessee of City-owned property at 426 W.

Lacey Boulevard, in the amount of $127,347 for building system repairs as required under the existing lease agreement and appropriate $127,347 from the Accumulated Capital Outlay Fund (0004)
Recommended Motion: I move to authorize the reimbursement to Consolidated Electrical Distributors, Inc., DBA Medallion Supply Hanford, lessee of City-owned property at 426 W. Lacey Boulevard, in the amount of $127,347 for building system repairs as required under the existing lease agreement and appropriate $127,347 from the Accumulated Capital Outlay Fund (0004) BACKGROUND:

The City entered into a lease agreement effective October 5, 2023, with Consolidated Electrical Distributors, Inc., doing business as Medallion Supply Hanford, for City-owned property located at 426 W. Lacey Boulevard. Section 7.1F of the lease requires the office/retail building’s mechanical, plumbing, electrical, and heating, ventilation, and air conditioning (HVAC) systems to be in good working order at the commencement of the lease.

The City was responsible for ensuring these systems met the required condition before the lease began. However, the City approved commencement of the lease while certain systems were not in good working order. Over the course of the lease, the lessee paid for repairs to address these initial deficiencies and has requested reimbursement totaling $127,347. The lessee has provided supporting documentation for the costs incurred.

Reimbursement was deferred due to pending related litigation, as the City was advised to hold payment until that matter was resolved. With the matter now resolved, staff recommends authorizing reimbursement. In addition to these building improvements, there is a bid currently out to repair the roof on the building, which staff recommends be paid for by the City as it would be in accordance with the lease agreement, as the roof was in disrepair at agreement execution. The roof item will be presented to City Council separately at a future meeting.

Page 301 of 444 ends

The proposed reimbursement addresses deficiencies that existed at lease commencement in the systems identified in Section 7.1F. It is separate from the lessee’s responsibility for routine maintenance and repairs during the lease.

FISCAL IMPACT:

An appropriation in the amount of $127,347 in the Accumulated Capital Outlay Fund (0004) is necessary to reimburse these costs.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Contract

2. Reimbursement Claim Package

Page 302 of 444 ends
Page 303 of 444 ends
Page 304 of 444 ends
Page 305 of 444 ends
Page 306 of 444 ends
Page 307 of 444 ends
Page 308 of 444 ends
Page 309 of 444 ends
Page 310 of 444 ends
Page 311 of 444 ends
Page 312 of 444 ends
Page 313 of 444 ends
Page 314 of 444 ends
Page 315 of 444 ends
Page 316 of 444 ends
Page 317 of 444 ends
Page 318 of 444 ends
Page 319 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | Request for Reimbursement / Rent Credit | Cover Letter | Page 1 September 14, 2026
Via Email and Certified Mail
Chris Tavarez
City Manager
City of Hanford
319 N. Douty Street
Hanford, CA 93230
Re: 426 W. Lacey Blvd. - Request for Reimbursement / Rent Credit of $142,697 Dear Mr. Tavarez:

Consolidated Electrical Distributors, Inc. (CED), d/b/a Medallion Supply Hanford, submits this consolidated request for reimbursement, or an equivalent fixed-dollar rent credit, in the amount of $142,697 for costs associated with conditions encountered at 426 W. Lacey Blvd. during the initial renovation and occupancy process. The enclosed package consolidates the existing Lease records, contemporaneous CED-City correspondence, contractor-generated invoices already issued, photographs/video stills, and other existing project records supporting the request.

CED previously raised these conditions with the City during the project. The record includes written notice on October 17, 2023 regarding a completely inoperable HVAC unit and concealed ceiling conditions; an April 17, 2024 preliminary chargeback summary following a meeting with the City; a June 19, 2024 follow-up requesting another meeting and advising that final invoices were being assembled; and a January 15, 2025 final expense summary totaling $142,697. That January 2025 correspondence also records the prior discussion of a possible free-rent concession as a means of addressing the costs.

CED recognizes that Section 6 of the Lease generally places Tenant improvements at CED's cost. The enclosed request, however, concerns conditions CED contends were pre-existing, building-related, required remediation/restoration, or Citydirected work rather than elective showroom upgrades. Section 7.1.B assigns Tenant ordinary maintenance and minor repair not exceeding $500 per occurrence. Section 7.1.D separately assigns the City responsibility for repair of structural components of the office/retail building, including the roof, HVAC, and plumbing systems, subject to the terms stated in that section. Section

7.1.F further requires the mechanical, plumbing, electrical, and HVAC systems of the office/retail building to be in good working order at commencement. Section 9.C addresses losses arising from Landlord breach/default and pre-existing environmental conditions. See Exhibit A.

The First Lease Amendment modified insurance provisions and contains a confirmation that neither party was then in default, but it does not contain an express release, settlement, or waiver of the reimbursement issues CED had already raised. CED continued pursuing the chargeback discussion shortly after the Amendment. See Exhibits B and C.

SUMMARY OF REQUEST
Condition / Work Amount Exhibit
Storefront glass replacement $4,800 D
Concealed showroom condition - demolition/restoration package $64,647 E HVAC Unit #1 - replacement of inoperable 4-ton unit $32,000 F HVAC Unit #2 - corrective stand/plenum/ducting work $12,800 G Roof repairs $5,300 H
Structural post & beam replacement $7,800 I
City-directed driveway approach work $15,350 J
TOTAL REQUESTED $142,697 D-J
$127,347
$127,347
Not office/retail building per agreeement

Page 320 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | Request for Reimbursement / Rent Credit | Cover Letter | Page 2

HVAC CONDITIONS ARE SEPARATE OCCURRENCES
The building contains three HVAC units. CED's request concerns two different units and two different conditions. HVAC Unit #1 was completely inoperable and required removal and replacement. HVAC Unit #2 was a separate existing unit that remained in place but required correction of its stand, plenum, ducting, and grilles. No reimbursement is requested for the third HVAC unit.

The two HVAC charges therefore should not be aggregated as a single $44,800 repair occurrence.

The contemporaneous October 2023 record is particularly important for Unit #1: CED notified the City shortly after lease execution that the unit was dead, and the original October 6, 2023 proposal quoted $15,000 for removal and replacement of the existing 4-ton unit. The final Invoice 227 reflects a broader completed scope of $32,000. Exhibit F presents both records without relying on any new statement or cooperation from the contractor.

CONCEALED SHOWROOM CONDITION
The showroom-related package totals $64,647 and consists of ceiling demolition, electrical demolition, drywall/ceiling restoration, electrical reinstallation labor and materials, and insulation. The existing records show that CED identified concealed bird contamination and significant building damage above the ceilings during the early project period, before the final invoices were issued. Exhibit E pairs the six invoices with the pre-construction ceiling photo/video stills and post-demolition stills documenting the exposed conditions and water-intrusion evidence.

EXISTING RECORDS / CONTRACTOR DISPUTE RESERVATION
This submission intentionally relies on records that already exist. CED is separately adverse to the general contractor concerning other project charges. Accordingly, no new contractor statement, declaration, certification, or cooperation is relied upon here. Contractor invoices, proposals, estimates, and other project records are included solely as contemporaneous evidence of the conditions encountered, work described, and amounts billed or attributed to that work. Their inclusion is not an admission that any contractor or subcontractor charge is valid, undisputed, finally owed, or payable. CED expressly reserves all rights, claims, defenses, offsets, objections, and remedies relating to its contractors and subcontractors.

REQUESTED RESOLUTION
CED requests reimbursement of $142,697 or, alternatively, a fixed $142,697 rent credit applied against future rent. CED is not requesting the separate $199,218.58 amortization figure referenced in the January 15, 2025 historical email. If the City prefers a rent-credit structure, CED proposes a fixed-dollar credit rather than a number of free-rent months so the value is not affected by annual rent adjustments.

Please provide a written response within fifteen (15) business days of receipt and identify the City's availability for a meeting to review the package. This request is submitted under and in connection with the Lease and is without waiver of any separate notice, claim-presentation, procedural, contractual, statutory, or other rights or requirements that may apply.

Sincerely,
Nick Warner
Profit Center Manager
Consolidated Electrical Distributors, Inc.
d/b/a Medallion Supply Hanford
426 W. Lacey Blvd.

Hanford, CA 93230
cc: CED Real Estate Department | CED Legal Department / Counsel $127,347

Page 321 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-002

Page 322 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-003

Page 323 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-004

Page 324 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-005

Page 325 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-006

Page 326 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-007

Page 327 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-008

Page 328 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-009

Page 329 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-010

Page 330 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-011

Page 331 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-012

Page 332 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-013

Page 333 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-014

Page 334 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-015

Page 335 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-016

Page 336 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-017

Page 337 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-018

Page 338 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit A | CED-HANFORD-REIMB-EXH-A-019

Page 339 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit B | CED-HANFORD-REIMB-EXH-B-002

Page 340 of 444 ends

CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
d/b/a MEDALLION SUPPLY HANFORD
426 W. Lacey Blvd. | Hanford, California 93230
CED / Medallion Supply Hanford | 426 W. Lacey Blvd. | $142,697 Reimbursement Claim | Exhibit B | CED-HANFORD-REIMB-EXH-B-003

Page 341 of 444 ends

12.H.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: CONSENT CALENDAR SUBJECT:

Authorize the City Manager to execute an agreement with NTM Productions of Visalia, CA for Council Chambers audio and video system replacements/upgrades in the amount of $61,284.32, and approve an additional appropriation of $11,284.32, to be funded by the IT Services Fund (0415), an internal service fund, with annual cost savings of approximately $63,000 yearly allocated to all operational departments
RECOMMENDATION:

Recommendation: That the City Council, by motion, authorize the City Manager to execute an agreement with NTM Productions of Visalia, CA for Council Chambers audio and video system replacements/upgrades in the amount of $61,284.32, and approve an additional appropriation of $11,284.32, to be funded by the IT Services Fund (0415), an internal service fund, with annual costs savings of approximately $63,000 yearly allocated to all operational departments Recommended Motion: I move to Authorize the City Manager to execute an agreement with NTM Productions of Visalia, CA for Council Chambers audio and video system replacements/upgrades in the amount of $61,284.32, and approve an additional appropriation of $11,284.32, to be funded by the IT Services Fund (0415), an internal service fund, with annual costs savings of approximately $63,000 yearly allocated to all operational departments BACKGROUND:

During the mid-cycle budget process, City Council appropriated $50,000 for Council Chambers equipment upgrades, recognizing the need to replace aging equipment and improve meeting reliability. Issues with the existing equipment have affected audio quality, reinforcing the need to complete this project.

NTM Productions proposes an integrated upgrade that includes cameras, audio processing, speakers, video switching, touchscreen controls, and supporting network equipment. Automated functions and simplified controls will make meeting operations more efficient for staff. The proposal includes installation, programming, testing, and on-site staff training. The total project cost is $61,284.32, requiring an additional appropriation of $11,284.32.

NTM Productions has a local presence in Visalia, allowing technicians to provide on-site assistance when needed, and is highly regarded for its work with other cities. The project coincides with renewal of the City’s current streaming system, allowing staff to coordinate a seamless transition. Under the proposed solution, the City would stream meetings through Zoom Webinar at an estimated annual

Page 342 of 444 ends

cost of only $1,200. Compared with the proposed Granicus renewal and upgrade, switching would result in estimated savings of $63,511 in Year 1 and $63,295 annually thereafter.

Most importantly, reliable equipment supports the City’s compliance with the public access and remote participation requirements established by Senate Bill 707. Signed into law in October 2025, SB 707 amended the Ralph M. Brown Act, with requirements for eligible legislative bodies beginning July 1, 2026. These include opportunities for the public to attend and comment remotely and procedures for addressing service disruptions. The proposed upgrades will improve audio clarity and system reliability, helping preserve public access and reduce meeting interruptions.

FISCAL IMPACT:

An additional appropriation of $11,284.32 from the IT Services Fund (0415) is necessary to fully fund the cost. However, by approving the proposal the City will achieve significant savings of approximately $63,000 annually.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Proposal

Page 343 of 444 ends

Audio / Video / Lighting/Network/Security
Proposal To:

City of Hanford
For:

Hanford Council Chambers
315-321 North Douty Street
Hanford, CA 93230
October 16, 2026
P-2526

Page 344 of 444 ends

NTM Productions ABOUT US
Our Commitment
NTM Productions is dedicated to enhancing
communication through advanced technology. Whether
your venue is a gymnasium, stadium, warehouse, city
boardroom, theater, sanctuary, or concert hall, we believe that the audio-visual experience should be exceptional and memorable.

Our Team
NTM is committed to excellence in managing and installing your next project. We deploy highly skilled project managers to ensure the seamless execution of your project. Our team of trained and certified technicians guarantees that the job is completed accurately and efficiently from the outset.

Additionally, our knowledgeable office staff is available to assist with equipment sales, rentals and service for any technical inquiries you may have.

Our Story
For over a decade, NTM Productions has delivered
comprehensive audio, video, lighting, network, and
security solutions to clients across the United States. We take pride in being an industry leader, combining the
capacity to meet diverse needs with the personalized
attention of a boutique firm.

Page 345 of 444 ends

COUNCIL CHAMBERS
SCOPE
Scope of Work — Council Chambers
NTM Productions shall provide all labor, materials, equipment, programming, commissioning, and training required to deliver a complete and fully operational audio/visual system upgrade for the Council Chambers.

The project includes installation of a professionally integrated audio system designed to provide clear and intelligible speech reinforcement throughout the Council Chambers, including the dais, audience seating areas, and presentation spaces. Work includes installation of 2 new loudspeakers for the council, amplifier, Video Switching equipment, networked AV components, user control interfaces, and all supporting infrastructure required for a complete and functional system.

NTM Productions will install and integrate a centralized audio and control platform that allows Council staff to easily manage daily meetings and presentations through a simplified touchscreen interface. The system will provide streamlined operation for common functions such as microphone muting, source selection, volume adjustment, presentation routing, and system power control.

Control integration will also include communication with third-party equipment and legacy devices where required. NTM will provide two of these touch screens for control at the IT station or the clerk station. The system can also be controlled wirelessly through an iOS application.

Installation work includes mounting and securing all AV equipment, installation of equipment racks and cable management systems, pulling and terminating all required low-voltage, speaker, signal, control, and HDMI cabling, and integration of all networkconnected AV devices into the facility infrastructure. All cabling will be professionally dressed, labeled, tested, and documented as part of the completed installation.

System programming and commissioning will include configuration of the digital signal processor, audio routing, amplifier setup, loudspeaker tuning, user interface programming, and integration of control devices to ensure reliable and intuitive system operation. NTM Productions will perform complete testing and optimization of the system, including verification of audio coverage, speech intelligibility, signal flow, source switching, control functionality, and overall system performance within the Council Chambers environment.

Upon completion of installation and commissioning, NTM Productions will provide on-site training for designated Council staff covering day-to-day operation of the system, including touchscreen controls, microphone operation, source selection, and basic troubleshooting procedures. Training sessions will be scheduled to allow staff time to become familiar with the system and address operational questions after initial use.

AUDIO

IMAGE QTY DESCRIPTION NOTES PRICE PRICE EXT LABOR TOTAL City of Hanford
Hanford Council Chambers
Confidential Proposal
P-2526
Equipment prices include any required accessories. Labor 3 of 7 Version 2 October 16, 2026 prices include installationand programming.

Page 346 of 444 ends

1 QSC CORE 24f Q-SYS Core
Processor with 24 local audio I/O
channels, 160x160 total network I/O
channels with 8x8 Software-based
Dante license included, USB AV
bridging, dual Ethernet ports for
network redundancy plus two
auxiliary Ethernet ports, two RS232
ports, 8x8 GPIO, 24 next-generation
AEC processors, 1RU. Includes
Scripting/UCI functionality.
$5,400.00 $5,400.00 $0.00 $5,400.00
2 Sonance 40132 PS-C83RT WHITE $600.00 $1,200.00 $0.00 $1,200.00 1 LEA Professional CS352D 2CH x
350W @ 4Ω, 8Ω, 70V and 100V per
channel • IoT Smart Amplifier for
Professional Audio Systems •
Includes Dante and AES67
connectivity • 3 Ways to Connect:

Access Point, Wi-Fi or Wired • 96kHz
capable Dante AOIP • Direct Lo-Z or
Hi-Z selectable by channel • 3000+
Speaker Tunings • Smart Power
Bridge Technology • Universal
Power Supply (85VAC-277VAC) •
Balanced Analog Inputs • LEA Cloud,
WebUI, SharkWare, 3rd Party API's
and more
$2,612.00 $2,612.00 $0.00 $2,612.00
1 West Penn Wire 226-1000BK West
Penn 226 2-Conductor 14 Gauge
Cable - Black - 1000 Feet
$411.98 $411.98 $0.00 $411.98
VIDEO

IMAGE QTY DESCRIPTION NOTES PRICE PRICE EXT LABOR TOTAL 1 Blackmagic
Design SWATEMSCN2/2ME2/4K A
TEM 2 M/E Constellation 4K
$3,795.00 $3,795.00 $0.00 $3,795.00
2 QSC TSC-101-G3 Q-SYS 10.1” PoE
Touch Screen Controller for In-Wall
Mounting. Color - Black only
IT Desk and clerk desk $3,230.00 $6,460.00 $0.00 $6,460.00 City of Hanford
Hanford Council Chambers
Confidential Proposal
P-2526
Equipment prices include any required accessories. Labor 4 of 7 Version 2 October 16, 2026 prices include installationand programming.

Page 347 of 444 ends

2 QSC NC-12x80 12x Optical Zoom
80° Horizontal Field of View, PTZ
Network Camera, PoE, with HDMI
and SDI output. Includes PTZWMB1 wall mount bracket
$4,175.00 $8,350.00 $0.00 $8,350.00
2 QSC NV-1-H-WE 4K60 4:4:4 HDMI
Encoder for in-wall applications,
interoperable with NV-32-H and
NV-21-HU. 1 HDMI 2.0 Input, PoE+,
Color - White.
$1,350.00 $2,700.00 $0.00 $2,700.00
1 QSC NV-21-HU Bundle $2,321.99 $2,321.99 $0.00 $2,321.99 2 Lumantek ez-SHV+ SDI to HDMI
Converter with Display and Scaler
$199.00 $398.00 $0.00 $398.00
1 Global Cache IP2CC-P Global
Cache iTach IP2CC with PoE Option
Control over electric
projector screen
$134.00 $134.00 $0.00 $134.00
1 Global Cache IP2IR-P iTach Wired
TCP/IP to IR with PoE
Control over local TV
on/off
$179.99 $179.99 $0.00 $179.99
1 QSC NS26-300+ 26-port network
switch preconfigured for Q-SYS
Audio, Video and Control with 24x
PoE+ ports and 300 Watts PoE
budget. Features advanced QoS
and IGMP configuration to also
support AES67 and Dante within
the same VLAN.

Dante and QLAN ready
network switch
$2,995.00 $2,995.00 $0.00 $2,995.00
1 Inogeni SDI2USB3 INOGENI SDI to
USB 3.0 Converter
$495.00 $495.00 $0.00 $495.00
1 BTX MD-HX DECIMATOR MD-HX:

HDMI/SDI CROSS CONVERTER W/
SCALI
$325.00 $325.00 $0.00 $325.00
2 Hosa HDMA-415 High Speed
HDMI Cable with Ethernet, HDMI to
HDMI, 15 ft
$20.95 $41.90 $0.00 $41.90
2 Hosa HDMA-403 High Speed
HDMI Cable with Ethernet, HDMI to
HDMI, 3 ft
$9.95 $19.90 $0.00 $19.90
City of Hanford
Hanford Council Chambers
Confidential Proposal
P-2526
Equipment prices include any required accessories. Labor 5 of 7 Version 2 October 16, 2026 prices include installationand programming.

Page 348 of 444 ends

SHIPPING AND HANDLING $1,581.25
MANAGEMENT COSTS $1,336.00
DESIGN AND ENGINEERING $2,115.65
2 Belden 1694A 010500 Belden
1694A RG6 coax, 500Ft, Blk
$665.75 $1,331.50 $0.00 $1,331.50
1000
Vertical Cable 161-101/BK 23
AWG 4 Unshielded Twisted Pair
Solid Bare Copper CMR NonPlenum CAT6 Cable - BULK
$0.36 $360.00 $0.00 $360.00
LABOR

IMAGE QTY DESCRIPTION NOTES PRICE PRICE EXT LABOR TOTAL 1 NTM
Productions Programming O
n-Site Programming and
Configuration
$1,600.00 $1,600.00
1 NTM
Productions Installation OnSite Installation and Wiring Services
$11,760.00 $11,760.00
City of Hanford
Hanford Council Chambers
Confidential Proposal
P-2526
Equipment prices include any required accessories. Labor 6 of 7 Version 2 October 16, 2026 prices include installationand programming.

Page 349 of 444 ends

PAYMENT SCHEDULE
50% deposit upon signing. 50% due upon completion.

SUBTOTAL $57,924.16
TOTAL SALES TAX $3,360.16
PROJECT TOTAL USD $61,284.32

ACCEPTANCE

FINANCIAL
TERMS
I accept this proposal and hereby authorize NTM Productions to proceed with the installation of the included systems at the facilities of City of Hanford constructing at 315-321 North Douty Street Hanford, CA 93230 as described in the totality of this document. I further authorize NTM Productions to be granted the facility access that will be required to complete this project in a workmanlike and timely manner and for payment to be made to NTM Productions. In keeping with the Terms of Payment listed above: It has been made clear to me that there exist no understandings regarding this project with any relevant party unless and until City of Hanford and NTM Productions agree to such additional or alternate understandings in writing. Project cost and pricing are dependent upon a continual flow of work without interruption or delays imposed by City of Hanford or their staff, construction, other building trades or any other party, and additional costs may be incurred by City of Hanford from NTM Productions. If such delays result in additional costs that are not covered by the pricing in this proposal: I agree that any additions to and/or deletions from the materials and labor to be provided by my acceptance of this proposal and any resulting change(s) in cost of this project shall only be by way of written change order(s) and shall be valid only after being signed by City of Hanford and NTM Productions. City of Hanford shall hold harmless NTM Productions officers and employees from any and all liability, claims, damages, losses, delays, costs, or expenses, arising out of or related to the performance, scheduling, or completion of services or work under this agreement. All equipment is considered property of NTM Productions until final invoices are paid in full.

ACCEPTANCE

CITY OF HANFORD

NTM PRODUCTIONS

SIGNED DATE

PRINT NAME TITLE

SIGNED DATE

PRINT NAME TITLE
Confidential Proposal
Equipment prices include any required accessories. Labor 7 of 7 Version 2 October 16, 2026 prices include installationand programming.

Page 350 of 444 ends

13.A.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: GENERAL BUSINESS SUBJECT:

Introduce the first reading of Ordinance 26-09 amending Chapter 13.04 of the Hanford Municipal Code relating to Water Service System
RECOMMENDATION:

Recommendation: That the City Council, by motion, waive the first reading of Ordinance 26-09 amending Chapter

13.04 of the Hanford Municipal Code relating to Water Service System.

Recommended Motion: I move to waive the first reading of Ordinance 26-09 amending Chapter 13.04 of the Hanford Municipal Code relating to Water Service System.

BACKGROUND:

Assembly Bill 1572 was enacted by the State of California to reduce potable water use by prohibiting the irrigation of nonfunctional turf on specified properties. The legislation requires public water systems to adopt or revise local regulations by January 1, 2027. The City of Hanford owns and operates a public water system and is therefore required to implement the provisions of AB 1572.

At the July 21, 2026, City Council Work Session staff presented to council the requirements of Assembly Bill AB1572, how the bill will affect existing landscapes, who it will affect, and the timeline for compliance. Staff also presented examples of functional and nonfunctional turf, and examples of compliant landscape designs. Council provided feedback on the proposed requirements of AB1572 and staff stated that revisions to the municipal code would be brought back to council for review and recommendation.

These municipal code revisions were presented to council during the October 6, 2026, City Council Meeting as a General Business item. Council reviewed the proposed municipal code amendments and directed staff to bring the proposed ordinance back at a future council meeting to introduce the first reading of Ordinance 26-09 amending Chapter 13.04 of the Hanford Municipal Code relating to Water Service System.

The ordinance will amend the following sections of Chapter 13.04 of the Hanford Municipal Code:
o 13.04.010. Definitions.
o 13.04.020. Services offered.
o 13.04.040. Water charges and rates.
o 13.04.150. Water use.
o 13.04.170. Administrative enforcement remedies.
o 13.04.190. Civil remedies.
o 13.04.200. Administrative citations.
o 13.04.210. Appeal.

These amendments will allow the City to comply with the January 1, 2027, deadline to adopt and/or revise local regulations. The amendments will also revise the penalty and appeal provisions to allow administrative citations for

Page 351 of 444 ends

violations and enforcement through the City's Code Enforcement Division. Staff also removed the flat rate service from sections 13.04.020 and 13.04.040. The flat rate service is no longer offered as an option to customers.

Accordingly, staff recommend the revisions to the City of Hanford Water Service System Ordinance Chapter 13.04 in attachment “A”.

FISCAL IMPACT:

Initial costs include staff time for inventory development, customer outreach, ordinance administration, and future landscape conversion projects, which will be absorbed within existing operational budgets as possible. Grant funding opportunities will be pursued where available.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Water Service System Ordinance Amendment

Page 352 of 444 ends

ORDINANCE NO. 26-09

AN ORDINANCE OF THE CITY OF HANFORD AMENDING HANFORD MUNICIPAL CODE CHAPTER 13-04 RELATING TO WATER SERVICE SYSTEM
The City Council of the City of Hanford does ordain as follows:

Section 1: Hanford Municipal Code Chapter 13.04 contains regulations regarding water service systems.

Section 2: The regulations contained in Chapter 13.04 were adopted several years ago, and the implementation of Assembly Bill No. 1572 Chapter 849 determined that provisions for water use on nonfunctional turf be added.

Section 3: Accordingly, Hanford Municipal Code Section 13.04.010, 13.04.020, 13.04.040,

13.04.150, 13.04.170, 13.04.190, 13.04.200, and 13.04.210 are hereby rescinded and restated as shown in the attached Exhibit “A,” which is incorporated herein by reference.

Section 4: This ordinance shall take effect thirty (30) days after its passage and shall be published once in the Hanford Sentinel within fifteen (15) days after its passage or a summary of this ordinance shall be published in the Hanford Sentinel in a manner consistent with the requirements of the California Government Code.

Passed and adopted at a regular meeting of the City Council of the City of Hanford duly called and held on , 2026, by the following roll call vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

APPROVED
ATTEST:

Mark Kairis
MAYOR of the City of Hanford

NATALIE CORRAL

CITY CLERK

Page 353 of 444 ends

STATE OF CALIFORNIA )
COUNTY OF KINGS ) ss

CITY OF HANFORD )
I NATALIE CORRAL, City Clerk of the City of Hanford, do hereby certify the foregoing ordinance was duly introduced at a regular meeting of the City Council of the City of Hanford on the 20th day of October 2026, and it was duly passed and adopted at a regular meeting of the City Council of the City of Hanford held on the day ___ of_______________ , 2026.

NATALIE CORRAL

CITY CLERK

Page 354 of 444 ends

Exhibit
“A”

Page 355 of 444 ends

Hanford Municipal Code Section 13.04.010. is hereby amended to state:

For the purpose of this chapter, certain words and phrases used in this chapter are defined as follows:
“Commercial service” means the furnishing of water to premises where the customer is engaged in trade or business.
“Commercial property” means a property that is zoned for commercial use in accordance with Title 17 of this Code.
“Common Area” means that portion of a common interest development or of a property owned or managed by a homeowners’ association or a community service organization or similar entity that is not assigned or allocated to the exclusive use of the occupants of an individual dwelling unit within the property.
“Common interest development” has the same meaning as in Section 4100 of the California Civil Code, as may be amended.
“Community service organization or similar entity” has the same meaning as in Section 4110 of the California Civil Code, as may be amended.
“Community space” means an area designated by a property owner or a governmental agency to accommodate human foot traffic for civic, ceremonial, or other community events or social gatherings.
“Customer” means any person or entity, including without limitation, the city, the state of California, the United States of America and any department or agency thereof, billed for water furnished by the water division of the city.
“Disadvantaged community” means a community within an annual median household income that is less than eighty percent (80%) of the statewide annual median household income. “Domestic service” means the furnishing of water for household residential purposes, including water used for sprinkling lawns, gardens and shrubbery, for washing vehicles, for cooling homes and for other similar and customary domestic purposes.
“Functional turf” means a ground cover surface of turf located in a recreational use area or community space. Turf enclosed by fencing or other barriers to permanently preclude human access for recreation or assembly is not functional turf. “Homeowners’ association” means an “association” as defined in Section 4080 of the California Civil Code, as may be amended.
“Industrial property” means property that is zoned for industrial use in accordance with Title 17 of this Code.
“Institutional property” is property used for an institutional purpose serving the public, including, without limitation, schools, higher education institutions, courts, churches, hospitals, governmental facilities, and nonprofit research institutions. “Industrial service” means the furnishing of water to premises for use by a customer in manufacturing or processing activities.
“Meter rate service” means the furnishing of water by measured quantities.

Page 356 of 444 ends

“Nonfunctional turf” means any turf that is not functional turf, and includes turf located within street rights-of-way and parking lots.
“Potable water” means water that is suitable for human consumption. “Premises” means any lot, piece or parcel of land or any building or other structure having a connection with the water system of the city.
“Private fire protection service” means any water line connected to the water system for the sole use of fire prevention. An individual water meter shall be required on each fire protection service. “Potable water” means water that is suitable for human consumption. “Recreational use area” means an area designated by a property owner or a governmental agency to accommodate human foot traffic for recreation, including, but not limited to, sports fields, golf courses, playgrounds, picnic grounds, or pet exercise areas. This recreation may be either formal or informal.
“Turf” has the same meaning as defined in Section 491 of Title 23 of the California Code of Regulations, as may be amended.
“Waste of water” means the improper use of, excessive use of or unlawful use of water supplied by the city.
“Water division” means that division of the city public works department designated to administer the water system of the California Water Service Company purchased by the city effective January 9, 1958. “Water division” shall include the superintendent and other employees of the city serving in the water division.
“Water system” means the water business purchased by the city from the California Water Service Company effective January 9, 1958, together with such additions and improvements thereto as may be made from time to time.

Hanford Municipal Code Section 13.04.020. is hereby amended to state:

A. All new connections to the water system shall be metered with a meter of at least one inch in size and installation of such meters shall be at the sole cost and expense of the applicant. a. Should a customer remodel, modify, change or alter its premises and the cost of such remodeling, modification, change or alteration exceeds $5,000, the applicant shall be required to install a water meter to measure water use by the customer at the premises.

The applicant shall pay the total cost of the purchase and installation of the meter, including without limitation, the cost of the meter-box. b. Should at any time, any federal, state or local law, regulation or ordinance mandate the installation of water meters for any type of water use, including, without limitation, the installation of water meters on currently unmetered service connections, then on the date any such federal, state or local law, regulation or ordinance is passed, adopted or enacted, the installation of water meters as required by such federal, state or local law, regulation or ordinance, shall be at the sole cost and expense of the owner of the real property upon which the meter is to be installed.

Page 357 of 444 ends

c. If a customer’s premises is demolished, destroyed or removed from the real property upon which it is located, reconnection to the water system shall require a meter and all costs shall be borne by the applicant.
d. Installation of all new water services, including, without limitation, water meters, shall be performed by contractors and/or subcontractors who are duly licensed by the California State Licensing Board. All methods, materials, work procedures, and workmanship shall conform to city standards and must be approved the by the utilities and engineering director or designee.
e. Customers who install meters shall only install city-approved meters, automated meter reading devices, and meter boxes. Determination of whether a turbine or compound meter is required shall be made by the utilities and engineering director or designee.

All meters, automated meter reading devices, and meter boxes installed to the city’s satisfaction shall become and remain the sole property of the city and shall be serviced and maintained by the city.
f. Approved backflow devices that are required to be installed by the utilities and engineering director or designee are required to be tested annually and repaired so they remain in good working order at the sole expense of the customer by a certified tester approved by the utilities and engineering director or designee. If the customer fails to have the backflow device tested or repaired in the timeframes provided in the service notice from the water division, the city reserves the right (but shall not be required) to test and/or repair the device at the sole cost of the customer and charge the customer for costs incurred and administrative and inspection fees established by separate resolution.
g. Subsections (A)(1) through (A)(6) of this section shall also apply to any premises located outside of the city limits, but within a county area receiving water service from the city.

B. Applicants for commercial service or industrial service shall be served under metered rates.

C. The water division shall furnish water at customer service connections at such pressure as may be available from time to time in the normal operation of the water division.

Hanford Municipal Code Section 13.04.040. is hereby amended to state:

A. Purpose. Charges and rates to pay the cost of operation, maintenance, debt service, equipment replacement, expansion and administration of the city water system, including, without limitation, the city cross-connection program identified in Chapter 13.16 of the Hanford Municipal Code, shall be levied against all customers of the city water system. The charges and rates shall be calculated in accordance with the provisions of this Chapter 13.04 and Chapter 13.16 of the Hanford Municipal Code and shall be adopted by resolution of the city council. Costs of the city water system shall include, without limitation, the following items:

Page 358 of 444 ends

1. Sufficient financing for an adequate operation and maintenance program, including without limitation, competent operating and management personnel;

2. Funds to be reserved for necessary future replacements, improvements, and expansions of the facilities; and

3. Funds to cover all debt service incurred in the maintenance, operation, replacements, improvements, expansions and management of the facilities.

B. Water Service Charges. The structure of the charges shall be as follows:

1. Meter rate services;

2. Private fire protection service.

C. Charges and Rates Outside the City Limits. For all other connections serving premises located outside the city limits, the rates to be charged a customer shall be one and one-half times the calculated meter rate for metered services. Included in such rates are additional charges for the following conditions:

1. Every user of water outside the limits of the city who shall have an evaporative cooler which does not have a recirculating pump connected to it and as a part thereof;

2. Every user of water outside the limits of the city who has a water cooled refrigeration unit which is not properly connected to a cooling tower designed and used for the purpose of reusing the same watering such refrigeration unit.

Hanford Municipal Code Section 13.04.150. is hereby amended to state:

A. Unlawful Acts. In the use of water supplied by the city no person shall:

1. Sprinkle, irrigate or otherwise apply water to any yard, ground, landscaping, or vegetation except on the following designated days: properties with even-numbered addresses, Tuesday and Saturday, and properties with odd-numbered addresses, Wednesday and Sunday; or

2. Sprinkle, irrigate or otherwise apply water to any yard, ground, landscaping or vegetation on any day of the week between the hours of ten a.m. and six p.m. during periods designated as “daylight savings time” (generally occurring between March and November); or

3. Sprinkle, irrigate or otherwise apply water to any yard, ground, landscaping or vegetation except by the use of: (a) a hand-held hose or (b) a sprinkling device or an approved sprinkling system controlled by an automatic shut-off device or a person who is in immediate attendance of the sprinkling device or system; or

4. Sprinkle, irrigate or otherwise apply water to any yard, ground, landscaping or vegetation during and up to 48 hours after measurable rainfall; or

Page 359 of 444 ends

5. Sprinkle, irrigate or otherwise apply water to any ornamental turf on public street medians; or

6. Sprinkle, irrigate or otherwise apply water to any yard, ground, landscaping or vegetation outside of a newly constructed home or building in a manner inconsistent with regulations or other requirements established by the California Building Standards Commission and the California Department of Housing and Community Development; or

7. Allow water used to irrigate any yard, ground, landscaping or vegetation to run or waste onto non-irrigated areas, private or public walkways, sidewalks, driveways, streets or adjoining or adjacent property; or

8. Keep, maintain, operate or use any water connection, hose, faucet, hydrant, pipe, outlet or plumbing fixture which is not tight and free from leakage and dripping; or

9. Wash any type of vehicle, boat or trailer with water supplied by a hose unless the hose is fitted with a shut-off nozzle or device attached to it that causes it to cease dispensing water immediately when not in use; or

10. Use water for sidewalk, driveway, or walkway washing or cleaning, except as required to address an immediate public health or safety need; or

11. Operate water fountains or other decorative water fixtures without recirculation pumps; or

12. Drain and fill a swimming pool or similar water feature more than once during a one-year period (all pool drainage must occur pursuant to a permit issued by the city’s utilities and engineering department); or

13. Willfully or negligently waste water in any manner; or

14. Use potable water for the irrigation of nonfunctional turf located on commercial, industrial, and institutional properties, other than a cemetery, and on properties of homeowners’ associations, common interest developments, and community service organizations or similar entities is prohibited as of the following dates:
a. All properties owned by the Department of General Services, beginning January 1, 2027.
b. All properties owned by local governments, local or regional public agencies, and public water systems, except those specified in subparagraph (5) below, beginning January 1, 2027.
c. All other institutional properties and all commercial and industrial properties, beginning January 1, 2028.

Page 360 of 444 ends

d. All common areas of properties of homeowners’ associations, common interest developments, and community service organizations or similar entities, beginning January 1, 2029.
e. All properties owned by local governments, local public agencies, and public water systems in a disadvantaged community, beginning January 1, 2031, or the date upon which a state funding source is made available to fund conversion of nonfunctional turf on these properties to climate-appropriate landscapes, whichever is later.

For purposes of this section, the term “water” shall mean potable and non-potable water unless otherwise stated.

Notwithstanding the restrictions contained in this subsection 14, the use of potable water is not prohibited to the extent necessary to ensure the health of trees and other perennial non-turf plantings, or to the extent necessary to address an immediate health and safety need.

All large recreational areas of two acres or more in turfed areas that are publicly owned or that are used for public purposes are excluded from subparagraphs 1 and 2 of this subsection A.

B. Serving of Drinking Water. The serving of drinking water, other than upon request, in eating or drinking establishments, including, but not limited to, restaurants, hotels, cafes, cafeterias, bars, or other public places where food or drink are served or purchased, is prohibited.

C. Hotels and Motels. Operators of hotels and motels within the city shall provide guests with the option of choosing not to have towels and linens laundered daily. Each hotel and motel shall prominently display notice of this option in each bathroom using clear and easily understood language.

D. Planting of Rye Grass Prohibited. The planting of rye grass on any serviced by the city’s water system is prohibited due to the amount of water required to cultivate and maintain that type of turf. Seasonal overseeding of ryegrass may be permitted within a designated recreational-use area where the turf provides a functional playing or active-recreation surface. Such turf constitutes functional turf under California Water Code Section 10608.12.

E. Conditional Watering Permits. The city may issue conditional watering permits that allow the watering of new landscaping on days and/or at times other than those identified in subsection A of this section; such exception to the limitations of subsection A is necessary and appropriate to allow the establishment of new plants and trees. The terms and conditions under which each permit is granted shall be determined by the city’s utilities and engineering department; provided, however, the issuance of conditional watering permits shall occur in a manner consistent with all current and future state and federal laws and regulations.

F. Charity and Community Vehicle Wash Events Prohibited. Charity and community vehicle wash events are prohibited. For purposes of this section, the term “charity and community vehicle wash events” shall include any event at which an individual or a group, which is not a commercial washing business operating legally in the city, offers to the general public or

Page 361 of 444 ends

portion thereof the service of washing, with water, any type of vehicle, boat or trailer in exchange for a fee, donation, other form of compensation, or for no compensation. Nothing contained in this subsection shall be interpreted to prohibit: (1) the operations of commercial washing businesses operating legally within the city, including, without limitation, commercial car washes operating at fixed sites and mobile car wash businesses; or (2) an individual or business from washing his/her/its own vehicles, boats and trailers as long as all washing activities comply with the requirements and restrictions of this section.

G. Leaks in Customer’s System. When a leak is discovered by a customer in a customer’s water system and a customer is charged for water that it has not used, as a result of the leakage, it shall be the policy of the city to aid the customer in locating the leak. If the leak is repaired by the customer within a period of 10 days of the date the leak is discovered and the customer can establish that a portion of the charges identified in its water bill are in excess of the amount normally charged to the customer, that excess amount of water use caused by the leakage shall be charged to the customer at the standard water rate. If the leak is not repaired by the customer within the 10 day period, the portion of the excess water usage which results from the leakage will be billed at two times the standard water rate until the leak is repaired by the customer. The city shall give prompt notice to a customer if the city obtains information indicating that a leak may exist in the customer’s exclusive control.

Hanford Municipal Code Section 13.04.170. is hereby amended to state:

A. Notice of Violation.

1. With respect to violations other than the failure to timely pay utility service charges, upon the determination by the city’s director of finance, director of public works, or designee that a person or entity has violated this chapter, such person or entity may be served with a written notice of violation. The notice shall, if feasible, describe the time, place, and circumstances of each violation charged and the corrective measures, if any, the person or entity is required to undertake to correct the violation. If the user who is responsible for the violation does not own the real property at which the violation occurred, the city will provide a copy of the notice to the owner when the notice is served upon the user.

2. The person or entity shall complete any corrective action described in the notice of violation within 10 calendar days of receipt of the notice of violation or shall identify in writing a proposed arrangement for the corrective action to be taken if corrective action cannot be reasonably completed during such 10 calendar day period. A proposed arrangement shall be submitted to the city official who issued the notice of violation.

3. Nothing in this section shall limit the authority of the city to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation.

B. Method of Service.

1. All written notices required by this chapter shall be served by personal delivery to the person or entity to be notified or by deposit in the United States Mail, certified with return receipt requested, addressed to such person or entity to be notified at his/her/its last known address as the same appears in the public records or other records pertaining to the matter

Page 362 of 444 ends

to which such notice is directed. Service by mail shall be deemed to have been completed at the time of deposit in the mail.

2. The failure of any person or entity to receive a notice properly served, mailed, posted, or published under this chapter shall not affect the validity of any proceedings occurring under this chapter.

C. Hearing.

1. If the director of finance, the director of public works, or designee, determines that the violation has not been eliminated by the deadline for compliance established pursuant to subsection A above, or that a violation has recurred prior to the compliance date, the city will set the matter for a hearing before a hearing officer designated by the city manager.

2. This hearing serves to provide a person or entity subject to a notice of violation a full opportunity to object to the determination that a violation has occurred, that the violation has continued to exist or has recurred, and/or that the person or entity is responsible for creating, maintaining, or fostering the violation. The failure of any person or entity subject to a notice of violation to appear at the hearing shall constitute a failure to exhaust administrative remedies.

3. The city clerk shall cause a written notice of hearing before the hearing officer to be served on each person and entity subject to the notice of violation and to the owner of the real property at which the violation occurred, if the owner and the user are different parties.

D. Notice of Hearing. Each hearing shall be set for a date not less than 15 calendar days nor more than 60 calendar days from the date of the notice of hearing unless the violator consents to a shortening or extension of time or the hearing officer determines that the matter is urgent or that good cause exists for an extension of time.

E. Conduct of Hearing.

1. At the date, time, and place set forth in the notice of hearing, the hearing officer shall conduct a hearing on the notice of violation.

2. At the hearing, the hearing officer shall consider any written or oral evidence, including the following:
a. The notice of violation and evidence submitted by persons subject to the notice of violation and by the city;
b. The objectively reasonable efforts made by the person or entity subject to the notice of violation to comply prior to the applicable compliance date; and c. Any condition or situation beyond the control of the person or entity subject to the notice of violation that prevented compliance by the applicable deadline.

F. Findings and Order.

1. Within 15 calendar days following the conclusion of the hearing, the hearing officer shall make findings and issue a written determination in connection with the notice of violation.

Page 363 of 444 ends

2. The findings made by the hearing officer shall be supported by the evidence received at the hearing or otherwise submitted to the hearing officer in accordance with State law or this code.

3. If the hearing officer finds by a preponderance of the evidence that a user has violated, or continues to violate, any provision of this chapter, excluding violations involving the timely payment of utility charges, the hearing officer may issue a compliance order containing the following:
a. Directive to the user ordering him/her/it to comply immediately with all requirements and take such appropriate remedial or preventive actions to properly address a continuing or threatened violation;
b. Directive to the user to cease activities causing or associated with the unauthorized activity;
c. Requirements to address the noncompliance or prevent the continuation, exacerbation, or reoccurrence of the violation;
d. Deadline for compliance;
e. Directive for the termination of water service to the violating property through the severance of the connection between the violating property and the city’s water system, if the user fails to take all required actions by the deadline established by the hearing officer;
f. Directive to the user to pay an administrative penalty for each violation, with each penalty not to exceed the maximum allowed under state law; g. Directive to the violator to pay reimbursement to the city for the fees and costs incurred by the city, including, without limitation, administrative costs and legal fees, associated with the violation;
h. Directive to the user to pay a deposit to the city that represents the fees and costs that the city will incur to address continuing violations;
i. Other terms, conditions, and/or requirements that the hearing officer finds reasonable; and/or
j. Authorization to city staff to take any other action that the hearing officer finds reasonable.

4. A compliance order does not relieve the user of liability for any violation, including any continuing violation. Issuance of a compliance order shall not be a bar against, or a prerequisite for, taking any other action against the user.

5. Every person and entity subject to a compliance order shall observe and comply with such order and with all applicable laws, permits, and other approvals of federal, state, and local governments in any and all actions taken pursuant to or in order to comply with the compliance order, including, without limitation, the payment of applicable fees and charges.

Page 364 of 444 ends

6. If the hearing officer finds one or more of the following exists, then the hearing officer shall issue a finding of those facts:
a. That a violation did not occur or recur at or on the subject property after the compliance date established through the notice of violation
b. That the person or entity subject to the notice of violation took all objectively reasonable steps to comply with the notice of violation by the applicable compliance date; or
c. That some condition or situation beyond the control of the person or entity subject to the notice of violation prevented compliance prior to the compliance date.

G. Administrative Penalties.

1. When the hearing officer finds that a user has violated, or continues to violate, any provision of this chapter, with the exception of violations associated with the failure to pay utility charges in a timely manner, the hearing officer may fine such user in an amount not to exceed the then-current maximum allowed by state law. Such penalties may be assessed on a per violation per day basis.

2. Unpaid charges, fines and penalties shall, after the payment deadline identified in the compliance order, be assessed an additional penalty in an amount established by the city council by resolution, and interest shall accrue thereafter at a rate established by the city council by resolution; provided however, the additional penalty and/or interest shall not apply if collection of the same by the city would violate state law.

3. Issuance of an administrative fine shall not be a bar against, or a prerequisite for, taking any other action against the user.

4. In determining the amount of a penalty, the hearing officer may take any or all of the following factors into consideration:
a. The period of time during which the violation(s) occurred; b. The nature, frequency, and recurrence of the violation(s); c. The ease with which the violation(s) could have been abated; d. The good faith efforts made to address the violation(s); e. The economic impact of the penalty on the person/entity responsible for payment; f. The impact of the violation on the public and/or property; and g. Such other factors as justice may require.

5. Penalties imposed by the hearing officer may accrue from a date no earlier than the compliance date specified in the compliance order and shall cease to accrue on the date the compliance order has been complied with as determined by the city.

6. Penalties assessed by the hearing officer shall be due by the date specified in the

Page 365 of 444 ends

compliance order.

7. Penalties assessed by the hearing officer are a debt owed to the city and, in addition to all other means of enforcement, may be enforced and collected through an assessment added to the property tax roll or though the recording of a lien against the real property at which the violation occurred.

8. If a person or entity subject to the compliance order gives written notice to the city officer issuing the notice of violation that the terms of the compliance order have been satisfied and if the director or designee finds that compliance has occurred, the date that the written notice is postmarked or personally delivered to the director or the date of the city’s final inspection, whichever occurs first, shall be deemed to be the date of compliance.

H. Report of Compliance after Compliance Order. If the director or designee issuing the notice of violation determines that a compliance order has been fully satisfied, the director or designee will file a report with the city clerk indicating that compliance has been achieved and the date of the city’s final inspection.

I. Compliance Dispute.

1. If the director or designee does not file a report required by subsection H above, a person or entity subject to a compliance order who believes that compliance has been achieved may request a compliance hearing by filing for a hearing with the city clerk.

2. The hearing shall be noticed and conducted in the same manner as a hearing on a notice of violation.

3. The hearing officer shall determine if compliance with the compliance order has been achieved and, if so, when it was achieved.

J. Right of Judicial Review. Following the exhaustion of administrative remedies identified in this chapter, any person or entity aggrieved by a compliance order may obtain review of such order in the superior court by filing with the court a petition for writ of mandate.

K. Lien and Tax Roll Assessment Procedures.

1. Whenever the amount of a penalty, cost, or fee, including interest, imposed upon a user by the city pursuant to this chapter has not been satisfied in full within 90 calendar days of an applicable due date and/or has not been successfully challenged, the obligation may constitute an assessment or a lien against the real property at which the violation occurred or is occurring.

2. The lien provided herein shall have no force or effect until recorded with the County Recorder. Once recorded, the lien shall have the force, effect, and priority of a judgment lien governed by the provisions of the California Code of Civil Procedure, as may be amended.

3. Interest shall accrue on the principal amount remaining unsatisfied pursuant to law at the rate established by the city council by resolution.

4. The director of finance or designee will, as applicable: (a) inform the Tax Collector for

Page 366 of 444 ends

Kings County, California of the assessment amount; and (b) record the lien in the office of the County Recorder for Kings County, California. The Tax Collector shall enter the amount on the county assessment book opposite the description of the real property, and the amount shall be collected together with all other taxes levied thereon against the real property. The assessment amount shall be collected at the same time and in the same manner as ordinary county property taxes are collected and shall be subject to the same penalties and interest and to the same procedure for foreclosure and sale in case of delinquency as provided for property taxes. All laws applicable to the levy, collection, and enforcement of county property taxes are made applicable to such assessment.

5. If a lien is recorded, the city clerk will record a notice of satisfaction or provide the property owner of the subject property with a notice of satisfaction that may be recorded once payment in full is received by the city of the outstanding penalties, costs, fees, and interest.

Such notice of satisfaction shall cancel the city’s lien.

L. Consent Orders. The director of finance, the director of public works, or designee, may enter into consent orders, assurances of compliance, or other similar documents establishing a voluntary agreement with any user responsible for noncompliance. Such documents shall include the specific action to be taken by the user to correct the noncompliance within a time period specified in the document. Such documents shall have the same force and effect as a compliance order issued by the city.

Hanford Municipal Code Section 13.04.190. is hereby amended to state:

A. When the director of finance, the director of public works, or designee finds that a user has violated or continues to violate, any provision of this chapter, with the exception of provisions pertaining to the timely payment of utility charges, such director or designee may petition the Superior Court of Kings County, California, through the city’s attorney, for the issuance of a temporary restraining order, temporary injunction, and/or permanent injunction, as appropriate, which restrains or compels the specific performance of any requirement imposed by this chapter. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against the user.

B. Nothing contained in this code shall preclude or limit the city from pursuing a civil action for damages against a person or entity that causes the city to incur injury, loss, costs, or expenses as a result of the person’s or entity’s violation of this chapter.

In addition to all other remedies, as part of any civil action brought by the city, a court may assess a civil penalty in an amount not to exceed the maximum allowed by state law per day for each violation with respect to any person or entity that violates this chapter, which penalty shall be payable to the city.

Hanford Municipal Code Section 13.04.200. is hereby amended to state:

A. Issuance of Citation.

1. Whenever the director of finance, the director of public works, or designee determines that

Page 367 of 444 ends

a violation of a provision of this chapter has occurred, such director or designee shall have the authority to issue an administrative citation to any person or entity responsible for the violation, with the exception of violations pertaining to the payment of utility charges.

2. Each administrative citation shall contain the following information:
a. The date of the violation or, if the date of the violation is unknown, then the date the violation is identified;
b. The address or a description of the location where the violation occurred; c. The section of this code violated and a description of the violation; d. The amount of the fine for the violation;
e. A description of the fine payment process, including a description of the time within which and the place to which the fine shall be paid;
f. An order prohibiting the continuation or repeated occurrence of the code violation described in the administrative citation;
g. A description of the administrative citation review process, including the time within which the administrative citation may be contested and the place from which a request for hearing form to contest the administrative citation may be obtained; and h. The name and signature of the individual issuing the citation.

B. Amount of Fines.

1. The amounts of the fines for code violations imposed pursuant to this section shall be set forth in a schedule of fines established by resolution of the city council.

2. The schedule of fines shall specify any increased fines for repeat violations of the same code provision by the same person or entity.

C. Payment of Fines.

1. Fines shall be paid to the city within 30 days from the date of the administrative citation.

2. Any administrative citation fine paid shall be refunded if it is determined, after an appeal hearing, that a person or entity charged in the administrative citation was not responsible for the violation or that there was no violation as charged in the citation.

3. Payment of a fine under this chapter shall not excuse, discharge, or permit any continuation or repeated occurrence of the code violation that is the subject of the administrative citation.

D. Hearing Request.

1. Any recipient of an administrative citation may appeal the citation by completing a request for hearing form and returning it to the city within 30 days from the date of the administrative citation, together with an advance deposit of the fine.

1. A request for hearing and deposit of the fine shall be submitted in writing to the city

Page 368 of 444 ends

clerk.

2. The person or entity requesting the hearing shall be notified of the time and place set for the hearing at least 10 calendar days prior to the date of the hearing.

3. If the city department that issued the citation submits an additional written report concerning the administrative citation to the hearing officer, then a copy of such report shall be served on the person requesting the hearing at least five calendar days prior to the date of the hearing.

E. Hearing Officer. A hearing officer designated by the city manager shall serve as the hearing body for appeals regarding administrative citations issued under this chapter.

F. Hearing Procedure.

1. No hearing to contest an administrative citation shall be held unless the fine has been deposited with the city in advance; provided however, the deposit requirement shall be waived if the director of the city department issuing the citation or designee determines that the appealing party is financially unable to deposit the amount of the fine. The process to waive the deposit and fee requirements set forth in Section 13.04.110 of this code relating to the appeal of water service charges shall, to the extent feasible, apply with respect to the waiver of the deposit of fine amounts.

2. A hearing shall be set for a date that is not less than 15 calendar days and not more than 60 calendar days from the date that the request for hearing is filed in accordance with the provisions of this section.

3. At the hearing, the party contesting the administrative citation shall be given the opportunity to testify and to present evidence concerning the administrative citation.

4. The failure of any recipient of an administrative citation to appear at the appeal hearing shall constitute a forfeiture of the fine and a failure to exhaust administrative remedies.

5. The administrative citation and any additional report submitted by the department issuing the citation shall constitute prima facie evidence of the respective facts contained in those documents.

6. The hearing officer may continue the hearing and request additional information from the city department issuing the citation or from the recipient of the administrative citation prior to issuing a written decision.

G. Hearing Officer’s Decision.

1. After considering all of the testimony and evidence submitted at the hearing, the hearing officer shall issue a written decision to uphold, modify, or cancel the administrative citation and shall list in the decision the reasons for the decision. The decision of the hearing officer shall be final.

2. If the hearing officer determines that the administrative citation should be upheld, then the fine amount on deposit with the city shall be retained by the city.

Page 369 of 444 ends

3. If the hearing officer determines that the administration citation should be canceled, then the city shall promptly refund the amount of the deposited fine.

4. If the hearing officer determines that the fine levied under the administration citation should be adjusted, then the city will promptly refund the amount of the deposited fine that exceeds the amount fixed by the hearing officer or the recipient of the administrative citation will promptly pay to the city an additional amount fixed by the hearing officer if the officer finds that the fine assessed under the administrative citation to be insufficient.

5. The recipient of the administrative citation shall be served with a copy of the hearing officer’s written decision.

H. Late Payment Charges. Any person or entity who fails to pay to the city any fine imposed pursuant to the provisions of this section on or before the date that the fine is due shall also be liable for the late payment charges described in Section 13.04.170(G) above.

I. Recovery of Administrative Citation Fines and Costs. The city may collect any past due administrative citation fine or late payment charge by use of all available legal means, including the tax roll and lien remedies described in Section 13.04.170(K) above. Collection costs shall be in addition to any penalties, interest, and/or late charges imposed upon the delinquent obligation. Collection costs imposed under this provision shall be added to and become a part of the underlying obligation. Any partial payment of an obligation, when a partial payment is permitted, will be applied first to the principal amount of the underlying obligation, then to any penalties, and then to interest.

J. Right to Judicial Review. Any person or entity aggrieved by a decision of the hearing officer on an administrative citation may obtain review of the decision by filing a petition for review with the Superior Court for Kings County, California in accordance with the timelines and provisions set forth in California Government Code Section 53069.4, as may be amended.

K. Notices. The administrative citation and all notices required to be given by this section shall be served on the responsible party by personal delivery thereof to the person or entity to be notified or by deposit in the United States Mail, certified mail with return receipt requested, addressed to such person to be notified at his/her/its last-known address as the same appears in the public records or other records pertaining to the matter to which such notice is directed.

Service by mail shall be deemed to have been completed at the time of deposit in the mail. If the user who is responsible for the violation does not own the real property at which the violation occurred, the city will also provide a copy of the citation and associated notices to the owner when the citation and notices are served upon the user.

Hanford Municipal Code Section 13.04.210. is hereby amended to state:

A. This section shall only apply to matters in which no appeal process is otherwise specified in this chapter.

B. Any person affected by any decision, action or determination by any city department in interpreting or implementing the provisions of this chapter may file with the city clerk, within 10 calendar days of the date of service of such decision, action or determination, a notice of

Page 370 of 444 ends

appeal to the city clerk appealing such decision, action or determination. Except as otherwise provided, the appealing party shall, at the time of submitting the notice of appeal, pay the applicable appeal fee, which shall be established by the city council, as a condition of the city processing the appeal. The notice of appeal shall set forth in detail all facts supporting the user’s appeal. The filing of the notice of appeal shall not limit the authority of the city to take such action as the city deems necessary to stop or prevent an ongoing or threatened violation of any of the provisions of this chapter, including actions or directives to prevent or stop threatened harm to the health or safety of the public.

C. Notwithstanding subsection B above, a user who is financially unable pay the appeal fee may file with the city clerk a request for a waiver of all or a portion of the required deposit and appeal fee. The waiver provisions set forth in Section 13.04.110 of this code shall, to the extent feasible, apply to appeal fees charged pursuant to this Section 13.04.210; provided however, the city manager shall possess decision-making authority over the waiver or partial waiver of appeal fees occurring under this section.

D. Upon receipt of a notice appeal and appeal fee, the city clerk shall set the matter for hearing before an appeal officer designated by the city manager, and after said hearing, the appeal officer may affirm, overrule or modify the decision, action or determination of a city department that is the subject of the appeal. To the extent feasible, the hearing provisions contained in Section 13.04.200 above shall apply to appeals occurring under this section.

E. Following the appeal hearing, an aggrieved user may seek judicial review of an appeal officer’s decision by filing a complaint with the Superior Court of Kings County, California during the period identified by California Code of Civil Procedure Section 1094.6, as may be amended.

Page 371 of 444 ends

13.B.

AGENDA

STAFF REPORT
MEETING DATE: 10/20/2026 AGENDA SECTION: GENERAL BUSINESS SUBJECT:

Adopt Resolution 26-64-R (1), authorizing the execution of the First Amendments to the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit for completion of the subdivision improvements; or Adopt Resolution No. 26-64-R (2) causing the incomplete sewer improvements that are obligation of Enclave 66, LLC (Developer) for Tract 915-Unit I and Tract 915-Unit II, to be completed by allowing the City Manager and his designees to undertake all necessary and appropriate action to complete the sewer improvements.

RECOMMENDATION:

Recommendation:

That the City Council adopt Resolution 26-64-R (1), authorizing the execution of the First Amendments to the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit for completion of the subdivision improvements; or,
Adopt Resolution 26-64-R (2), authorizing the City Manager and his designees to terminate the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit 2, revoke any previously issued permits for Enclave 66, LLC (Developer) to construct the improvements required under the Subdivision Agreements, and cause the incomplete sewer improvements that are obligation of the Developer to be completed by allowing the City Manager and his designees to undertake all necessary and appropriate action to complete the sewer improvements and any remaining subdivision improvements as deemed necessary.

Recommended Motion:

I move to adopt Resolution 26-64-R (1), authorizing the execution of the First Amendments to the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit for completion of the subdivision improvements; OR,
I move to adopt Resolution 26-64-R (2), authorizing the City Manager and his designees to terminate the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit 2, revoke any previously issued permits for Enclave 66, LLC (Developer) to construct the improvements required under the Subdivision Agreements, and cause the incomplete sewer improvements that are obligation of the Developer to be completed by allowing the City Manager and his designees to undertake all necessary and appropriate action to complete the sewer improvements and any remaining subdivision improvements as deemed necessary.

SUMMARY:

Enclave 66 LLC. (Developer), failed to meet the requirements of Section §16.24.110 of the Hanford Municipal Code, which stipulates that the subdivision improvements must be completed within twentyPage 372 of 444 four (24) months after the July 21, 2023 recording of the final map, unless an extension is granted by Council. The Developer failed to complete the improvements for Tract 915-1 and 915-2 within the stipulated timeframe and did not request an extension within the required minimum thirty (30) days prior to the expiration of the Subdivision Improvement Agreements (Agreements). The Agreements have expired.

Both subdivision tracts contain a substantial amount of improvements that remain outstanding, including a sewer lift station and conveyance piping (sewer improvements) required to be constructed with Tract 915-Unit 1 that will not only serve the Developers' subdivisions, but future developments in the region. Further delays in the completion of the sewer improvements will only continue to be detrimental to ongoing and future subdivision developments in the area.

City staff have made multiple coordinated efforts to address the expired agreements and outstanding subdivision improvements with the Developer and have had partial success. In order to rectify all matters associated with Tract 915-Unit 1 and Tract 915-Unit 2, amendments (First Amendments) to the subdivision agreements must be executed, by Council's adoption of a resolution in accordance with the Hanford Municipal Code, to allow the Developer to continue to complete the outstanding improvements, including any other First Amendment stipulations. Developer must execute the First Amendments and submit the signed and notarized documents to staff prior to the City Council agenda meeting date.

In the interest of avoiding further delays, City staff is requesting that the City Council consider two (2) separate motions to act upon, depending on the Developer's willingness and continued cooperation with the City to complete their subdivision requirements.

Therefore, Staff recommends that City Council adopt the appropriate version of Resolution 26-64-R; 1) authorizing the execution of the First Amendments to the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit 2 for completion of the subdivision improvements; OR, in the instance that the First Amendments were not signed and submitted by Developer to City staff prior to the October 20, 2026 Council meeting; Then, 2) authorizing the City Manager and his designees to terminate the Subdivision Agreements associated with Tract 915-Unit 1 and Tract 915-Unit 2, revoke any previously issued permits for Enclave 66, LLC (Developer) to construct the improvements required under the Subdivision Agreements, and cause the incomplete sewer improvements that are obligation of the Developer to be completed by allowing the City Manager and his designees to undertake all necessary and appropriate action to complete the sewer improvements and any remaining subdivision improvements as deemed necessary.

By executing the First Amendments, the Developer acknowledges the terms and conditions associated with continuing to complete Tract 915-Unit 1 and Tract 915-Unit 2 and the timing to which occupancies of the subdivision will be allowed (to be at time of issuance of a Notice of Completion).

The first resolution associated with this circumstance will allow extension of the subdivision agreements and provide conditional milestones to which the sewer improvements shall be timely constructed. Additionally, the resolution provides further stipulations should the Developer default or underperform.

Conversely, should the Developer contest the First Amendments and not deliver signed and notarized documents to city staff prior to the October 20th Council meeting, the second resolution ordering the uncompleted sewer improvements to be completed will allow city staff to seek construction by other developments and potentially collect from the Developer’s performance bonds to cover the Developer's fair-share costs, in addition to terminating the existing subdivision agreements and revoking any previously issued permits.

Page 373 of 444 ends

The location of the Tract 915-1 and 915-2 subdivisions are provided on the attached aerial maps.

BACKGROUND:

A Tentative Subdivision Agreement was executed between the Developer and City on June 6, 2022, allowing the Developer to install improvements within the boundary of the developments prior to recording a final map or providing security bonds.

On July 18, 2023, final Subdivision Improvement Agreements for Tract 915-1 and Tract 915-2 were executed. The final maps for both Tract 915-1 and Tract 915-2 subdivisions are attached for reference, consisting of a 26-lot subdivision and a 40-lot subdivision respectively, and recorded with Kings County Recorder’s Office on July 21, 2023. Due to a portion of the improvements being completed under the Tentative Subdivision Improvement Agreement, the Developer provided reduced bonds for the final Subdivision Improvement Agreements reflecting the cost for remaining improvements to be installed.

The Developer has completed the majority of the residential home construction for Tract 915-1 but has failed to provide, among other required improvements, the sanitary sewer lift station and conveyance piping (sewer improvements) within the abutting arterial and collector streets to provide sewer service to the development, resulting in the City of Hanford’s Building Department being unable to issue certificates of occupancy.

Currently, there are no residential homes constructed for Tract 915-2. The Developer has only installed underground utilities and a portion of required right-of-way improvements.

On June 12, 2026, the City, in a good faith effort, provided an unsolicited offer to extend the expired Subdivision Improvement Agreements (SIA) for both Tract 915-1 and Tract 915-2 as described in Section §16.24.110 of the Hanford Municipal Code, with amendments to the SIA’s (First Amendments) that included a path forward to allow for completion of the developments.

On July 8, 2026, City staff held an in-person meeting at the Developer’s request to discuss the contents of the First Amendments associated with the extension. City staff left this meeting with the understanding that both parties could move forward with mutually agreed-upon modifications to the First Amendments. Modifications to the First Amendments were made accordingly and mailed via Certified Mail to the Developer for signature on July 21, 2026. Attempts for certified delivery by the United States Postal Service (USPS) were unsuccessful and, ultimately, the documents were returned to City staff after the Developer failed to pick up the parcel at the USPS facility.

On August 3, 2026, a voicemail was received from the Developer with what City staff determined to be unsubstantiated concerns and responded accordingly via email on August 3, 2026. A response from the Developer was subsequently received on August 5, 2026, stating a response to the agreements would be provided later in the day, however a response was never received.

On August 17, 2026, City staff provided a letter to the Developer by Certified Mail notifying it of the breach of the Subdivision Improvement Agreements for Tract 915-1 and Tract 915-2. After receiving no response from the Developer or a receipt of delivery from USPS and in an effort to keep the Developer informed, City staff emailed the Developer a copy of the letter on August 26, 2026. Again, City staff did not receive a response. The letter is attached for Council's reference.

In addition to the continued efforts to amend and extend the Developer's agreements, City staff spent additional time and resources determining an alternate route for the sewer system as the initial design required an off-site easement over and across an adjacent parcel not owned by the Developer. This

Page 374 of 444 ends

was an attempt to relieve the Developer of the easement acquisition process by providing a less impactful and fast-tracked improvement design for the sewer improvements to be completed on time, as it is imperative that the sewer improvements be completed as other developments in the area are dependent upon these improvements. The alternate sewer improvement plans were accepted for construction by the City on August 20, 2026.

Due to the ongoing and multiple attempts made by City staff to work with the Developer to rectify the issue and extend the agreement terms to allow the Developer to complete the outstanding improvements, City staff brought the matter before City Council on September 15, 2026, to request that Council authorize and cause the incomplete sewer improvements to be completed. This action is consistent with Hanford Municipal Code § 16.24.110 Completion of improvements A: Subdivisions of Five or More Parcels. The subdivision improvements shall be completed by the subdivider within 24 months, or such time as approved by the city engineer, not to exceed a period of 36 months, after the recording of the final map, unless an extension is granted by the council. The improvements shall be completed prior to the final building inspection or occupancy of any unit within the subdivision. "Should the subdivider fail to complete the improvements within the specified time, the city, by resolution of the council and at its option, may cause any or all uncompleted improvements to be completed, and the parties executing the improvement security shall be firmly bound for the payment of all necessary costs."
The item was moved to October 6, 2026 meeting, at the request of the Developer, and subsequently rescheduled by staff to the October 20, 2026 Council meeting to allow further internal discussion during a closed session with City Council at the October 6th meeting. Following the September 15, 2026 Council meeting, City staff met with the Developer and further coordinated and clarified the First Amendment stipulations necessary to seamlessly allow the Developer to continue completion of their subdivision tracts. Further adjustments were made to the First Amendments following City Council's direction during the October 6th closed session.

To date, the Developer has secured a contractor to begin completion of the sewer improvements and has coordinated such efforts and permitting with city staff.

ENVIRONMENTAL REVIEW:

Initial Study, Mitigated Negative Declaration No. 2018-06, and all notices related thereto were prepared in compliance with the California Environmental Quality Act (CEQA) and the City of Hanford Municipal Code Policies.

PRIOR COUNCIL ACTION:

City Council approved the Final Maps for Tract 915-1 and Tract 915-2 on July 18, 2023.

PRIOR PLANNING COMMISSION ACTION:

Planning Commission approved Vesting Tentative Tract 915 on June 26, 2018.

Planning Commission approved Resolution No. 2019-20, regarding Amendment #1 to Planned Unit Development No. 2018-01 on September 10, 2019.

FISCAL IMPACT:

The City will retain the right to submit a claim under the Developer’s performance bond and/or pursue

Page 375 of 444 ends

any other remedy available under law for potential reimbursement costs incurred for completion of the sewer improvements installed by others.

STRATEGIC GOAL: Indicates which City Strategic Goal(s) this item supports.

Check all that apply.
☐
Quality of
Life
☐
Community
Engagement
☐
Fiscal
Sustainability
☐
Efficient &
High
Performing
Government
ATTACHMENTS:

1. Aerial Maps

2. Tract 915-1 SIA

3. Final Map-Tract 915-1

4. Tract 915-2 SIA

5. Final Map-Tract 915-2

6. Default Notice-Tract 915-1 and Tract 915-2 -Signed

7. Resolution 26-64-R (1)

8. Resolution 26-64-R (2)

Page 376 of 444 ends
Page 377 of 444 ends
Page 378 of 444 ends
Page 379 of 444 ends
Page 380 of 444 ends
Page 381 of 444 ends
Page 382 of 444 ends
Page 383 of 444 ends
Page 384 of 444 ends
Page 385 of 444 ends
Page 386 of 444 ends
Page 387 of 444 ends
Page 388 of 444 ends
Page 389 of 444 ends
Page 390 of 444 ends
Page 391 of 444 ends
Page 392 of 444 ends
Page 393 of 444 ends
Page 394 of 444 ends
Page 395 of 444 ends
Page 396 of 444 ends
Page 397 of 444 ends
Page 398 of 444 ends
Page 399 of 444 ends
Page 400 of 444 ends
Page 401 of 444 ends
Page 402 of 444 ends
Page 403 of 444 ends
Page 404 of 444 ends
Page 405 of 444 ends
Page 406 of 444 ends
Page 407 of 444 ends
Page 408 of 444 ends
Page 409 of 444 ends
Page 410 of 444 ends
Page 411 of 444 ends
Page 412 of 444 ends
Page 413 of 444 ends
Page 414 of 444 ends

UTLILITIES & ENGINEERING | 900 SOUTH 10TH AVE. HANFORD, CA 93230 559.585.2500 | WWW.HANFORD.CITY
PAGE | 1 OF 1
Dan Bailey, Manager
Enclave 66, LLC.
5526 W. Sweet Dr.

Visalia, CA. 93291 August 17, 2026
Re: Breach of Subdivision Improvement Agreements- Tract 915-1 and Tract 915-2 Mr. Bailey,
On June 12, 2026, the City of Hanford (City), in a good faith effort provided an unsolicited offer to extend the already expired Subdivision Improvement Agreements (SIA) for both Tract 915-1 and Tract 915-2 as described in Section §16.24.110 of the Hanford Municipal Code, with amendments to the SIA’s (Amendments) that included a path forward to allow for compleƟon of the developments.

On July 8, 2026, City staff held an in-person meeƟng with you at your request to discuss the contents of the Amendments associated with the extension. City staff leŌ this meeƟng with the understanding that both parƟes could move forward with mutually agreed upon modificaƟons to the Amendments.

On July 21, 2026, the City modified the Amendments that were conforming with your requests made at the July 8, 2026 meeƟng, and sent an email copy to you for your review. In that email you were also noƟfied that a hard copy was being mailed to you for your signature and that the signed Amendments were to be submiƩed to the City no later than August 4, 2026, so that the City could maintain an August 18, 2026 City Council meeƟng for the approval of the Amendments. An aƩempt on July 27, 2026, by the United States Postal Service (USPS) to deliver the documents via CerƟfied Mail was unsuccessful as nobody was available to receive the delivery. The USPS has since been holding the documents for your in-person pickup and receipt at their facility.

During the Ɵme following our in-person meeƟng, and with your knowledge, the City, in a good faith effort, has been spending addiƟonal Ɵme reviewing sanitary sewer force main improvement plans for your development.

The plans are being produced by an engineering firm with interest in developing an adjacent subdivision; which is also reliant on the sanitary sewer improvements aƩributed to your development improvement plans. The adjacent development cannot proceed due to the incomplete improvements of Tract 915-1.

On August 3, 2026, City staff received a phone call from you with concerns regarding the sanitary sewer force main plans. City staff found that your concerns were unsubstanƟated and staff responded accordingly via email on August 3, 2026. Again, staff requested you sign and return the Amendments to the City by the August 4, 2026, deadline so staff can move forward with the August 18, 2026 City Council date for approval.

As of the date of this leƩer, beyond the August 4th deadline, the City has not received the signed Amendments.

Therefore, the City deems your company in breach of the Subdivision Improvement Agreements (SIAs) for Tract 915-1 and 915-2 and withdraws the Amendments for Tract 915-1 and Tract 915-2 that were previously mailed to you. The agenda item for the August 18, 2026, City Council date has been removed.

Page 415 of 444 ends

UTLILITIES & ENGINEERING | 900 SOUTH 10TH AVE. HANFORD, CA 93230 559.585.2500 | WWW.HANFORD.CITY
PAGE | 1 OF 2
Since your company failed to Ɵmely complete the liŌ staƟon and force main, a resoluƟon will, in accordance with Hanford Municipal Code SecƟon 16.24.110.A., be considered by the Hanford City Council at its September 15, 2026 meeƟng. The City will cause the uncompleted liŌ staƟon and force main to be constructed should the Council adopt the resoluƟon. During the public comment porƟon of the Council meeƟng, you will have an opportunity to address the Council before it considers and acts upon the proposed resoluƟon.

As a path forward, and as a condiƟon of the issuance of a NoƟce of CompleƟon for Tract 915-1 and for Tract 915- 2, the following requirements must be saƟsfied.
 New SIA Amendments will be required for both Tract 915-1 and Tract 915-2, as the construction deadline for the remaining subdivision improvements have lapsed and your company is in breach. The new Amendments will be submitted to you and must be executed and returned by the deadline specified by the City.
 Proportionate share of costs associated with the city’s installation of the sanitary sewer lift station and force main will be enforced and due in full at the time of your execution of the new SIA Amendments.  Your surety company will need to provide documentation to the City confirming that the existing bonds remain in effect with respect to remaining subdivision improvements, which must be completed under the to-be-amended SIA’s, or that they will issue new bonds.  The City will also require you to provide updated insurance documents.

With your company’s failure to complete the required improvements, city staff have determined that creaƟng an avenue for surrounding projects to proceed with their development is a priority. Should the City Council determined that the City will cause the liŌ staƟon and force main to be constructed, the City, will retain the right to submit a claim under your performance bond and/or pursue any other remedy available under law should your company fail to pay its proporƟonate share of construcƟon costs as described above.

The compleƟon of the sanitary sewer improvements by the city will not allow occupancy for Tract 915-1 or Tract 915-2. Occupancy of Tract 915-1 and 915-2 will be withheld unƟl such Ɵme that new SIA Amendments are executed, your company’s share of costs for the liŌ staƟon and force main are paid in full, all remaining subdivision improvements are completed and accepted by the city, and you have been issued a NoƟce of CompleƟon.

Sincerely,
Frank Senteno, Director
UƟliƟes and Engineering Division
City of Hanford

Page 416 of 444 ends

RESOLUTION NO. 26-64-R

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HANFORD,

CALIFORNIA, REGARDING AMENDMENT OF SUBDIVISION AGREEMENTS AND

COMPLETION OF SUBDIVISION IMPROVEMENTS
At a regular meeting of the City Council of the City of Hanford, duly called and held on October 20, 2026, at 7:00 p.m., it was moved by Council Member _________________, and seconded by Council Member ____________________, and duly carried that the following resolution be adopted:

WHEREAS, the City of Hanford (“City”) and Enclave 66, LLC (“Subdivider”) executed Subdivision Improvement Agreements (“Subdivision Agreements”) for Tract No. 915 Unit 1 (“Tract 915-1”) and Tract No. 915 Unit 2 (“Tract 915-2”); and WHEREAS, pursuant to the Subdivision Agreements, Subdivider was to construct subdivision improvements associated with Tract 915-1 and Tract 915-2; and WHEREAS, the required subdivision improvements include, without limitation, a sanitary sewer lift station and force main (collectively “Sewer Improvements”); and WHEREAS, the term of each Subdivision Agreement was twenty-four (24) months, commencing on July 21, 2023, the date on which the Final Maps for Tract 915-1 and Tract 915-2 were recorded; and

WHEREAS, Subdivider failed to construct various subdivision improvements, including, without limitation, the Sewer Improvements, prior to the expiration of the Subdivision Agreements; and
WHEREAS, Subdivider’s construction of improvements under the Subdivision Agreements is secured by performance bonds; and
WHEREAS, the City worked with Subdivider to prepare Amendments to the Subdivision Agreements to allow Subdivider additional time to complete the required subdivision improvements, including the Sewer Improvements; and
WHEREAS, a First Amendment to Subdivision Agreement for Tract 915-1 is attached hereto as Exhibit “A,” which is incorporated herein by reference; and WHEREAS, a First Amendment to Subdivision Agreement for Tract 915-2 is attached hereto as Exhibit “B,” which is incorporated herein by reference; and WHEREAS, the First Amendment to the Tract 915-1 Subdivision Agreement and the First Amendment to the Tract 915-2 Subdivision Agreement are hereinafter collectively referred to as “the First Amendments”; and

Page 417 of 444 ends

WHEREAS, the Sewer Improvements are required for the development of properties in the vicinity of Tract 915-1 and Tract 915-2, and the delayed construction of the Sewer Improvements impacts the development of those nearby properties; and WHEREAS, Hanford Municipal Code Section 16.24.110.A. indicates that, if a subdivider fails to complete subdivision improvements within the time specified in a Subdivision Agreement, the City Council, by resolution, may cause any uncompleted improvements to be completed; and WHEREAS, the City Council finds that, if Subdivider fails to satisfy the terms of the amended Subdivision Agreements pertaining to the Sewer Improvements, including, without limitation, construction milestones or deadlines identified in the First Amendments, it will be in the City’s best interest for the City to cause the completion of the Sewer Improvements so that development of properties in the vicinity of Tract 915-1 and Tract 915-2 may occur; and WHEREAS, the City Council further finds that, if Subdivider fails to timely complete any other subdivision improvements as required under the amended Subdivision Agreements, it may be in the City’s best interest to cause those improvements to be completed.

NOW, THEREFORE, BE IT RESOLVED, the First Amendments are hereby approved, and the Director of the City’s Utilities and Engineering Department is hereby authorized and directed to execute the First Amendments on the City’s behalf.

BE IT FURTHER RESOLVED, the City Council hereby accepts the Certificate of Correction referenced in the First Amendment to the Tract 915-1 Subdivision Agreement.

BE FURTHER RESOLVED, should Subdivider breach one or both of the amended Subdivision Agreements:

1. The City Manager of the City of Hanford (“City Manager”) and his designee(s) shall have the authority and are hereby directed to: (i) terminate the amended Subdivision Agreements; and (ii) revoke any permits previously issued by the City for Developer’s construction of the improvements required under the Subdivision Agreements.

2. Pursuant to Hanford Municipal Code Section 16.24.110.A., the City will cause the Sewer Improvements to be completed if Subdivider fails to do so in accordance with the amended Subdivision Agreements. The City Manager and his designee(s) shall undertake all necessary actions to cause the Sewer Improvements to be completed in such case.

3. The City Manager and his designee(s) shall have the discretion to cause any remaining subdivision improvements required under the amended Subdivision Agreements to be completed if the City Manager or his designee(s) determines that the completion of such improvements serves the City’s best interest.

Page 418 of 444 ends

4. The City Manager and his designee(s) are hereby directed to collect from Subdivider and/or Subdivider’s performance bond underwriter Subdivider’s fair share of construction costs for the Sewer Improvements and/or other subdivision improvements that the City may cause to be completed in accordance with this Resolution.

PASSED, ADOPTED AND APPROVED this 20th day of October, 2026 by the following vote:

AYES:________________________________________________________________________ NOES:________________________________________________________________________ ABSTAIN: ____________________________________________________________________ ABSENT: _____________________________________________________________________ Approved _______________________________

MARK KAIRIS
Mayor
Attest:
________________________

NATALIE CORRAL
City Clerk

STATE OF CALIFORNIA)
COUNTY OF KINGS ) ss

CITY OF HANFORD )
I, Natalie Corral, City Clerk of the City of Hanford, do hereby certify the foregoing Resolution was duly passed and adopted at a regular meeting of the City Council of the City of Hanford held on the 20th day of October, 2026.

Date:

City Clerk

Page 419 of 444 ends

EXHIBIT “A”
First Amendment to Subdivision Agreement for Tract 915-1 Dan Bailey, Manager
Enclave 66, LLC.
5526 W. Sweet Dr.

Visalia, CA. 93291 October 13, 2026
Re: Expiration of Tract 915-1 Subdivision Improvement Agreement Mr. Bailey,
In response to your letter to the city dated April 30, 2026, and subsequent discussions, the city is providing the following information:

The Final Map for Tract 915-1 recorded with Kings County Recorder’s Office on July 21, 2023. The process described within Section §16.24.110 of the Hanford Municipal Code is in place for a subdivider to seek an extension of a subdivision improvement agreement when approaching twenty-four (24) months after the recording of the final map if all improvements are not completed. The subdivider, Enclave 66, LLC., for Tract 915-1 failed to request an extension of the Subdivision Improvement Agreement (SIA) causing the SIA to expire. Section §16.24.110 of the Hanford Municipal Code is provided in the following pages.

It is the intent of the City of Hanford to waive the deadline for a request to extend the SIA and offer an extension of the Tract 915-1 SIA to Enclave 66, LLC, with amendments that, if approved by City Council, will terminate one-hundred eighty (180) days from the date of City Council approval to allow for completion of all outstanding development improvements and to ultimately obtain a Notice of Completion. As to avoid delays to adjacent developers that are reliant on the lift station, which will be installed by your entity, as their only means of sanitary sewer conveyance, completion of the sanitary sewer system to full operation and City acceptance must occur within sixty (60) days of City Council approval of this amendment.

In the event that the subdivider fails to complete and have the City accept the outstanding sanitary sewer improvements within sixty (60) days of Council approval of the amendment, the City of Hanford will exercise its rights to utilize the bonds provided by the subdivider’s surety to complete the remainder of the outstanding sewer improvements. In such case, the one hundred eighty (180) day allowance to complete other outstanding improvements will be null and void, and, in such case, the City may exercise its right to utilize the bonds provided by your company’s surety to complete the improvements.

All sections within the original SIA will remain unchanged with the exception of the terms modified by the amendment.

The enclosed First Amendment to Subdivision Agreement Improvement must be signed and returned to the City no later than October 19, 2026. If you fail to do so, your company will be deemed in breach of the Subdivision Improvement Agreement and the City will pursue all remedies available, including, without limitation, submission of a claim under the performance bond held by the city.

Page 420 of 444 ends

___________________________________
Frank Senteno, P.E.

Director, Utilities and Engineering
Hanford Municipal Code:
§ 16.24.110 Completion of improvements.

A. Subdivisions of Five or More Parcels. The subdivision improvements shall be completed by the subdivider within 24 months, or such time as approved by the city engineer, not to exceed a period of 36 months, after the recording of the final map, unless an extension is granted by the council. The improvements shall be completed prior to the final building inspection or occupancy of any unit within the subdivision.

Should the subdivider fail to complete the improvements within the specified time, the city, by resolution of the council and at its option, may cause any or all uncompleted improvements to be completed, and the parties executing the improvement security shall be firmly bound for the payment of all necessary costs.

B. Subdivisions of Four or Less Parcels. The completion of improvements will not be required until such time as a permit or other grant approval for the development of any parcel within the subdivision is applied for. The completion of the improvements may be required by a specified date by the city when the completion of such improvements is found to be necessary for the public health or safety or for the orderly development of the surrounding area. This finding shall be made by the city engineer or authorized representative. The specified date, when required, shall be stated in the subdivision improvement agreement. The improvements shall be completed prior to the final building inspection or occupancy of any unit within the subdivision.

C. Extensions. The completion date may be extended by the council for subdivisions of five or more parcels and by the city engineer for subdivisions of four or less parcels upon a written request by the developer and the submittal of adequate evidence to justify the extension. The request shall be made not less than 30 days prior to the expiration of the subdivision improvement agreement. The subdivider shall enter into a subdivision improvement agreement extension with the city. For subdivisions of five or more parcels the agreement shall be prepared and signed by the city engineer, approved as to form by the city attorney, executed by the subdivider and the issue of the improvement securities, and transmitted to the council for its consideration. If approved by the council, the mayor shall execute the agreement on behalf of the city.

In consideration of a subdivision improvement agreement extension, the following may be required:

1. The revision of improvement plans to provide for current design and construction standards when required by the city engineer;

2. Revised improvement construction estimates to reflect current improvement costs as approved by the city engineer;

3. The increase of improvement securities in accordance with revised construction estimates; and

4. Inspection fees may be increased to reflect current construction costs but shall not be subject to any decrease or refund.

The council may impose additional requirements as recommended by the city engineer or as it may deem necessary as a condition to approving any time extension for the completion of improvements. The costs incurred by the city in processing the agreement shall be borne by the subdivider at actual cost.

Page 421 of 444 ends

RECORDING REQUESTED BY:

CITY OF HANFORD
AND WHEN RECORDED, MAIL TO:

CITY CLERK

CITY OF HANFORD
317 N. Douty
HANFORD, CA 93230
Gov. Code 27383
SPACE ABOVE THIS LINE FOR RECORDER’S USE

FIRST AMENDMENT TO

SUBDIVISION IMPROVEMENT AGREEMENT
HOLLY HILLS TRACT 915-1, ENCLAVE 66
This First Amendment to Subdivision Improvement Agreement (“Amendment”) is effective as of the _______ day of ______________, 2026 (“Effective Date”) and is entered into by and between the City of Hanford, a municipal corporation (“CITY”) and Enclave 66, LLC, a California limited liability company (“SUBDIVIDER”).

Recitals
A. WHEREAS, CITY and SUBDIVIDER executed that Subdivision Agreement (“Agreement”) for the SUBDIVISION, dated June 15, 2023, the terms of which are incorporated herein by reference; and
B. WHEREAS, the Agreement was executed in association with the Final Map for Tract No. 915, Unit 1 recorded on July, 21, 2023 in Volume 27, of Maps, at Page 25, Kings County Records, as Fee Book No._2310548, which is incorporated herein by reference; and C. WHEREAS, per Hanford Municipal Code Section 16.24.110.A., all subdivision improvements for the SUBDIVISION were to be completed within twenty-four (24) months after the recording of the SUBDIVISION’s Final Map; and
D. WHEREAS, Hanford Municipal Code Section 16.24.110.C. allows for the completion date for subdivision improvements to be extended by the Hanford City Council upon written request of a developer submitted to CITY not less than thirty (30) calendar days prior to the expiration of the project’s Subdivision Agreement; and
E. WHEREAS, SUBDIVIDER did not submit a request to extend the Agreement in accordance with Hanford Municipal Code Section 16.24.110.C.; and F. CITY is willing to waive the deadline for SUBDIVIDER’s submission of an Agreement extension request.

Page 422 of 444 ends

NOW, THEREFORE, for valuable consideration received, CITY and SUBDIVIDER hereby amend the Agreement as follows:

A. Restriction on Development and Sale of Lots:

1. SUBDIVIDER will not sell or lease any lots within the SUBDIVISION prior to SUBDIVIDER’s completion and CITY’s acceptance of all outstanding SUBDIVISION improvements subject to the Agreement or this Amendment.

2. CITY will issue no building permits for residential structures within the SUBDIVISION until all SUBDIVISION improvements subject to the Agreement or this Amendment have been completed by SUBDIVIDER and accepted by CITY.

3. With respect to any residential structures within the SUBDIVISION for which CITY previously issued building permits, SUBDIVIDER will receive Certificates of Occupancy for such structures at such time that: (i) all SUBDIVISION improvements required under the Agreement or this Amendment have been completed by SUBDIVIDER and accepted by CITY; and (ii) the CITY’s Building Division performs final inspections and approves the residential structures.

B. Final Map Certificate of Correction:

1. SUBDIVIDER shall, within thirty (30) calendar days of the Effective Date, provide a Certificate of Correction for review by the CITY to amend the Owner’s Statement on the Tract 915 Unit 1 Final Map. The statement: “WE FURTHER OFFER FOR

DEDICATION EASEMENTS FOR WATER OR SANITARY SEWER ANYWHERE WITHIN LOT B,” shall be changed to read: “WE FURTHER OFFER FOR

DEDICATION A PUBLIC EASEMENT FOR THE INSTALLATION, OPERATION,

AND MAINTENANCE OF WATER IMPROVEMENTS AND FOR THE

INSTALLATION, OPERATION, AND MAINTENANCE OF GAS LINES AND

CONDUITS FOR ELECTRIC, TELEVISION AND TELEPHONE SERVICES,

TOGETHER WITH ANY AND ALL APPURTENANCES PERTAINING THERETO ANYWHERE WITHIN LOT B.” CITY will not take ownership of or responsibility for sanitary sewer or storm drainage infrastructure within private streets.

SUBDIVIDER will produce all required documentation for CITY review and will record the document approved by CITY, all of this being at SUBDIVIDER’s expense and as a condition of Notice of Completion issuance.

C. Sanitary Sewer Improvements:

1. SUBDIVIDER shall construct sanitary sewer lift station improvements as shown on the improvement plans submitted by the SUBDIVIDER and approved by CITY, which are incorporated herein by reference; with exception to the sewer system conveyance piping, which has been redesigned to route through Millennium Way for conveyance to the existing fifteen-inch (15”) sanitary sewer main located in Centennial Drive. The lift station shall be sized to service future areas as shown on the “Sanitary Sewer Design” exhibit, dated 12/3/2018 as provided by Zumwalt Hansen, Inc., and re-assessed by AKEL Engineering on 6/10/26, which are incorporated herein by reference. The force main has been sized for conveyance as identified with the re-assessed “SW Lacey Sewer Tributary Area” map, which is

Page 423 of 444 ends

attached hereto as Exhibit “A” and incorporated herein by reference. The twelveinch (12”) piping between SSMH-14 and SSMH-15 that has already been installed along the Aquifer Drive project frontage associated with the conveyance of the lift station effluent as shown in the original improvement plans approved by the city May 26, 2022, shall be abandoned in place by SUBDIVIDER by plugging with brick and mortar on each end. Manhole SSMH-14 shall be abandoned in place by removing the top portion of the manhole to a minimum of four-feet (4’) below grade or to an elevation that is below the designed grade of the new force main, whichever is greater, creating drain holes in the floor of the manhole for drainage purposes and then filled with compacted sand to the top of the barrel. Manhole SSMH-15 shall be abandoned by removing the top of the manhole to a minimum of four-feet (4’) below finished grade, create holes in the floor of the manhole for drainage purposes and fill with compacted sand to the top of the barrel. Both manholes shall be completed to grade with clean backfill and approved road section material to finished grade. The installation of additional twelve-inch (12”) piping between the north boundary of Tract 915 Phase I to Lacey Boulevard shall not be a requirement of SUBDIVIDER. SUBDIVIDER’s construction of the sanitary sewer improvement described herein will not relieve SUBDIVIDER from the payment of sanitary sewer development impact fees that are unrelated to the improvements constructed by SUBDIVIDER hereunder.

2. SUBDIVIDER shall install a permanent sanitary sewer force main within the paved roadway section of city right-of-way to flow south to Millennium Way and shall continue to the east on Millennium Way and connect to existing manhole “EX.

SSMH-3,” as indicated on the revised sanitary sewer force main improvement plans that have been accepted by the City on August 20, 2026 and which are incorporated herein by reference, located at the intersection of Millennium Way and Centennial Drive. All trenching shall conform to CITY Standard Detail ST-8, which is incorporated herein by reference, and all asphalt previously installed that is affected by the trenching shall be heater-remixed by use of infrared asphalt repair once repaved. All costs associated with design and installation shall be at the SUBDIVIDER’s sole expense as a condition of Notice of Completion issuance. a. All force main piping shall be fully installed and ready for use by November 14, 2026. This shall include all trench backfill, testing and asphalt paving.

3. The lift station and all other associated sanitary sewer improvements required hereunder, including roadway trench and permanent paving, shall be completed and in a condition for CITY’s acceptance within sixty (60) calendar days of the Hanford City Council’s approval of this Amendment. Within the sixty (60) calendar day period, Developer shall establish a temporary power source to energize the lift station in the interim until such time that Southern California Edison (“SCE”) can provide the dedicated permanent power source to the lift station per the design.

The temporary power shall not be installed under the existing block wall, and an overhead alternative shall be utilized. Developer shall be responsible for the operation of the temporary power source and shall take all action necessary to ensure that, if power to the lift station is interrupted as a result of the failure of the temporary power source, Developer will take immediate action to restore power by repairing the temporary power source. Upon the installation of permanent power by SCE, the temporary power source shall be removed by Developer at

Page 424 of 444 ends

Developer’s sole cost. Temporary power sources such as generators and the like will not be utilized as an interim power source.
a. Lift Station coating and testing shall be completed by November 4, 2026. b. Pumps and mechanical piping shall be installed and ready for start-up testing by December 2, 2026, including temporary power. c. Start up and testing of sanitary sewer lift station shall take place by December 10, 2026.

4. SUBDIVIDER shall obtain an encroachment permit from CITY for the portion of work to complete the installation of the force main within Aquifer Drive, Millennium Way and Centennial Drive.

5. All costs incurred by CITY associated with the sewer improvements described herein, including, without limitation, CITY staff time, legal fees, mapping, recording and amending improvement plans shall be reimbursed by SUBDIVIDER. Payment to CITY shall be due, in full, within thirty (30) calendar days of SUBDIVIDER’s receipt of a written payment request from CITY.

D. Refund Agreement and Prevailing Wage:

1. SUBDIVIDER may be entitled to enter into a refund agreement with CITY in accordance with Hanford Municipal Code Section 13.08.140.B, which is incorporated herein by reference, for reimbursement of a portion of the sanitary sewer lift station improvements which also provide a benefit to other properties.

2. All work for which SUBDIVIDER will receive reimbursement from CITY shall be subject to California statutory prevailing wage requirements, and SUBDIVIDER shall be solely responsible for satisfying such requirements. SUBDIVIDER shall indemnify, defend, and hold CITY and its officials, officers, agents, representatives, and employees harmless from any and all liability, losses, claims, damages, awards, penalties, and costs of whatsoever kind or character, including, without limitation, attorneys’ fees and costs, to the extent arising out of, or related, directly or indirectly, to the failure by SUBDIVIDER or SUBDIVIDER’s contractor to satisfy prevailing wage requirements. This duty to indemnify, defend, and hold harmless shall survive the termination or expiration of the Agreement.

E. Landscaping and Irrigation:

1. SUBDIVIDER shall complete the installation of landscaping along Millennium Way and Aquifer Drive development frontages as shown in the approved landscape improvement plans as a condition of Notice of Completion issuance.

F. Street Improvements: SUBDIVIDER shall complete all paving, signage, and pavement striping and energized streetlights on interior streets, Millennium Way and Aquifer Drive as shown in the approved improvement plans as a condition of Notice of Completion issuance.

Page 425 of 444 ends

G. Storm Drainage Basin Improvements: SUBDIVIDER shall complete the installation of the outfall structure in the storm drainage basin as shown in the approved improvement plans as a condition of Notice of Completion issuance.

H. Weed Abatement and Dust Control: SUBDIVIDER shall, on a consistent basis, monitor and control weed growth for both interior and exterior of the subdivision. Fugitive dust shall be mitigated for uncompleted portions of the development by installing a dust palliative and reapply at intervals per product manufacturer directions.

I. Community Facilities District:

1. SUBDIVIDER acknowledges that, as a condition of approval (“CFD Condition of Approval”) for Tract No. 915, a residential subdivision project known as “Enclave 66,” a Community Facilities District (“CFD”) shall be formed for the purpose of funding public safety services (“CFD Public Safety”). It is further contemplated that SUBDIVIDER, as the party that owns the land comprising the SUBDIVISION will cast the votes required under the California Government Code to approve the special taxes (“Special Taxes”) to be levied by the CFD.

2. All costs associated with the formation of the CFD will be at the expense of the SUBDIVIDER. Upon receipt of CITY’s written request, SUBDIVIDER will deposit with CITY an amount representing the anticipated costs that CITY will incur to form the CFD. SUBDIVIDER will deposit additional amounts should CITY anticipate that the deposit held by CITY will be insufficient to complete the process to form the CFD and levy CFD assessments.

3. The CFD formation and the approval of assessment amounts are material conditions to the amended Agreement. Should SUBDIVIDER oppose the CFD formation or fail to utilize its voting authority to approve the CFD assessment amounts, this Amendment shall automatically terminate and SUBDIVIDER will be deemed in default of the Agreement.

J. Agreement Expiration: The amended Agreement shall expire one hundred eighty (180) calendar days from the date on which this Amendment is approved by the Hanford City Council (“Expiration Date”). Except as otherwise specified herein, all IMPROVEMENTS required under the Agreement and this Amendment, including, without limitation, the sewer, landscape, irrigation, storm drainage, and street improvements referenced herein, must be completed by the Expiration Date.

K. Default: If SUBDIVIDER defaults hereunder, CITY may terminate this Agreement by providing written notice to SUBDIVIDER and/or pursue any remedy available at law or in equity.

The remedies available to CITY will include, without limitation, the filing of a claim under SUBDIVIDER’s performance and payment security for the completion of the IMPROVEMENTS.

Remedies available to CITY shall be cumulative and not restrictive.

L. Effect of Amendment: All terms and conditions of the Agreement that are not otherwise amended herein shall remain in full force and effect.

Page 426 of 444 ends

M. Miscellaneous:

1. If an action at law or in equity is necessary to enforce or interpret the terms of the Agreement or this Amendment, the prevailing party shall be entitled to reasonable attorneys’ fees, costs and necessary disbursements in addition to any other reasonable relief to which it may be entitled. With respect to any suit, action or proceeding arising out of or related to this Agreement, or the documentation related hereto, the parties hereby submit to the jurisdiction and venue of the Superior Court for the County of Kings, State of California for any proceeding arising hereunder.

2. If any provision of the Agreement or this Amendment is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall nevertheless continue in full force and effect without being impaired or invalidated in any way.

3. No change, amendment or modification of the Agreement shall be valid unless the same be in writing and signed by the parties hereto.

4. Waiver of a breach or default under the Agreement shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under the Agreement.

IN WITNESS WHEREOF, the parties have executed this Amendment at Hanford, Kings County, California.

Dated: ______________________, 2026

SUBDIVIDER
ENCLAVE 66, LLC, a California limited liability
company
By: ______________________________

DANIEL BAILEY
Manager
Dated: ______________________, 2026
CITY
CITY OF HANFORD, a municipal corporation
By: ______________________________
Frank Senteno, P.E.

Utilities and Engineering Director
Dated: ______________________, 2026
ATTEST:

By: _____________________________

NATALIE CORRAL
City Clerk

Page 427 of 444 ends

STATE OF CALIFORNIA )
) SS
COUNTY OF ____________ )
On ______________, 20___, before me, _________________________________, Notary Public, personally appeared __________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
(SEAL)
________________________________

NOTARY PUBLIC

A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

Page 428 of 444 ends

STATE OF CALIFORNIA )
) SS
COUNTY OF ____________ )
On ______________, 20___, before me, _________________________________, Notary Public, personally appeared __________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
(SEAL)
________________________________

NOTARY PUBLIC
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

Page 429 of 444 ends

EXHIBIT “B”
First Amendment to Subdivision Agreement for Tract 915-2 Dan Bailey, Manager
Enclave 66, LLC.
5526 W. Sweet Dr.

Visalia, CA. 93291 October 13, 2026
Re: Expiration of Tract 915-2 Subdivision Improvement Agreement Mr. Bailey,
In reference to Tract 915-2 of the Enclave Subdivision, the city is providing the following information:

The Final Map for Tract 915-2 recorded with Kings County Recorder’s Office on July 21, 2023. The process described within Section §16.24.110 of the Hanford Municipal Code is in place for a subdivider to seek an extension of a subdivision improvement agreement when approaching twenty-four (24) months after the recording of the final map if all improvements are not completed. The subdivider, Enclave 66, LLC., for Tract 915-2 failed to request an extension of the Subdivision Improvement Agreement (SIA) causing the SIA to expire. Section §16.24.110 of the Hanford Municipal Code is provided in the following pages.

It is the intent of the City of Hanford to waive the deadline for a request to extend the SIA and offer an extension of the Tract 915-2 SIA to Enclave 66, LLC, with amendments that, if approved by City Council, will terminate three-hundred sixty-five calendar (365) days from the date of City Council approval to allow for completion of all outstanding development improvements and to ultimately obtain a Notice of Completion.

In the event that the subdivider fails to complete the outstanding subdivision improvements by the end of the extended term of the SIA, the City of Hanford will exercise its rights to utilize the bonds provided by the subdivider’s surety provider to complete the improvements.

All sections within the original SIA will remain unchanged with the exception of the terms modified by the amendment.

The enclosed First Amendment to Subdivision Agreement Improvement must be signed and returned to the City no later than October 19, 2026. If you fail to do so, your company will be deemed in breach of the Subdivision Improvement Agreement and the City will pursue all remedies available, including, without limitation, submission of a claim under the performance bond held by the city.

___________________________________
Frank Senteno, P.E.

Director, Utilities and Engineering

Page 430 of 444 ends

Hanford Municipal Code:
§ 16.24.110 Completion of improvements.

A. Subdivisions of Five or More Parcels. The subdivision improvements shall be completed by the subdivider within 24 months, or such time as approved by the city engineer, not to exceed a period of 36 months, after the recording of the final map, unless an extension is granted by the council. The improvements shall be completed prior to the final building inspection or occupancy of any unit within the subdivision.

Should the subdivider fail to complete the improvements within the specified time, the city, by resolution of the council and at its option, may cause any or all uncompleted improvements to be completed, and the parties executing the improvement security shall be firmly bound for the payment of all necessary costs.

B. Subdivisions of Four or Less Parcels. The completion of improvements will not be required until such time as a permit or other grant approval for the development of any parcel within the subdivision is applied for. The completion of the improvements may be required by a specified date by the city when the completion of such improvements is found to be necessary for the public health or safety or for the orderly development of the surrounding area. This finding shall be made by the city engineer or authorized representative. The specified date, when required, shall be stated in the subdivision improvement agreement. The improvements shall be completed prior to the final building inspection or occupancy of any unit within the subdivision.

C. Extensions. The completion date may be extended by the council for subdivisions of five or more parcels and by the city engineer for subdivisions of four or less parcels upon a written request by the developer and the submittal of adequate evidence to justify the extension. The request shall be made not less than 30 days prior to the expiration of the subdivision improvement agreement. The subdivider shall enter into a subdivision improvement agreement extension with the city. For subdivisions of five or more parcels the agreement shall be prepared and signed by the city engineer, approved as to form by the city attorney, executed by the subdivider and the issue of the improvement securities, and transmitted to the council for its consideration. If approved by the council, the mayor shall execute the agreement on behalf of the city.

In consideration of a subdivision improvement agreement extension, the following may be required:

1. The revision of improvement plans to provide for current design and construction standards when required by the city engineer;

2. Revised improvement construction estimates to reflect current improvement costs as approved by the city engineer;

3. The increase of improvement securities in accordance with revised construction estimates; and

4. Inspection fees may be increased to reflect current construction costs but shall not be subject to any decrease or refund.

The council may impose additional requirements as recommended by the city engineer or as it may deem necessary as a condition to approving any time extension for the completion of improvements. The costs incurred by the city in processing the agreement shall be borne by the subdivider at actual cost.

Page 431 of 444 ends
← All documents from this meeting