Cities Index.
Attachment A to Exhibit H

Hawaiian Gardens City Council
October 22, 2025

Document
Attachment A to Exhibit H
Meeting
October 22, 2025
Body
Hawaiian Gardens City Council
Original file
164 KB
Text extracted from the city's file for reading and search. Open the original on hgcity.primegov.com. That file is the official record.

Case Number PLNG2024-0011-MUP Page 1
October 22, 2025
ATTACHMENT “A”
Conditions of Approval
Case Number PLNG2024-0011-MUP (Surf City Boats, Inc.)
The Planning Commission hereby approves Case No. PLNG2024-0011 Minor Use Permit (MUP), subject to the following conditions necessary to protect the public’s health, safety, and general welfare.

Planning Department:

1. This Minor Use Permit will allow for the operation of boat sales, and sales of boat parts and accessories (Surf City Boats, Inc) on property located at 12347 E.

Carson Street. No other ancillary services and/or other businesses or uses shall be allowed at the subject site unless approved by the Community Development Department.

2. This approval allows for the sales of new and used boats (owned solely by Freedom Boat Club/Surf City Boats, Inc.), and allows only for the sale of boats ranging in size from 20-30 feet in length.

3. No maintenance, repair, or painting of any boats and trailers shall be conducted on the premises. No installation of any products, upholstery installation or repair shall be conducted on the premises.

4. The operator of the facility shall be responsible at the close of each business day to clean the property of all trash and debris including the adjacent public ways.

5. The driveways and parking lot shall not be sprayed or washed with any type of cleaning agent that could potentially be hazardous to the environment.

6. The approved hours of operation are as follows:

Daily 9:00 AM to 6:00 PM, by appointment only.

7. The Boat Sales use, per the approved site Plan, requires a minimum of ten (10) onsite customer parking spaces, to be provided per Code. The parking requirement is calculated based on the following operational characteristics and site layout shown on the approved Plan:
a. 1 space per 250 square feet of office area (1,500/250 = 6 spaces); b. 1 space per 1,000 square feet of outdoor display (3,900/1,000 = 4 spaces).

8. All parking areas shall be repaved and restriped per HGMC 18.70.010 under separate permit, subject to the review and approval by Planning and Building Divisions.

Case Number PLNG2024-0011-MUP Page 2
October 22, 2025

9. All customer parking identified on the approved Plan shall be for passenger cars and light-duty passenger trucks. Such customer parking area shall remain free of display and for-sale boats, trailers, and equipment.

10. Customer vehicles shall be parked in designated spaces only and shall not otherwise be parked in the drive aisles or other areas of the facility.

11. No sales or advertising is permitted from public streets or sidewalks.

12. All onsite improvements, including Parking lot Paving and Restriping, Landscape and Screening, Trash Enclosure and Recycling, Fencing, Walls, Gates, Lighting shall be shown on the plans for plan check in compliance with HGMC 18.70 Nonresidential Regulations, submitted to Community Development for review and approval under separate.

13. The existing perimeter chain link fencing and barbed wire (sitewide) shall be removed. The block wall on the south property line shall remain. Perimeter walls and fencing shall be replaced as follows: 1) The north and west property lines shall have a decorative block wall with a maximum height of six (6) feet; 2) The east property line along Claretta Avenue shall be a combination of low non-view obscuring decorative block wall with decorative wrought iron on top, with a combined maximum overall height of six (6) feet. All decorative block walls shall have anti-graffiti coating.

14. Exterior façade improvements shall be made to the mobile office building under separate permit, subject to HGMC 18.70.090 Non-residential Design Guidelines.

The owner/applicant shall provide existing and proposed elevations for review and approval by Community Development subject to all applicable review and permits.

15. Site-wide security cameras shall be provided to survey the subject site at all times.

16. A photometric lighting plan shall be provided with plans submitted for plan check to show that all areas on the site are lit, and that no lighting spillover will occur offsite.

17. The owner/applicant shall provide a security lighting plan during plan check for the subject site including customer and employee parking, boat and trailer display parking, and equipment areas.

18. All site lighting shall be shielded away from residential properties.

19. Noise generated from the business shall comply with HG Municipal Code. In any case, noise shall not exceed 65 dBA, as measured at the property line. Should Case Number PLNG2024-0011-MUP Page 3
October 22, 2025
any noise complaints be formally submitted to the Sheriff Department/Code Enforcement, the applicant/owner shall be responsible to hire a noise consultant to measure the dBA during use and provide the evidence to Community Development staff that said use does not exceed 65 dBA.

20. Onsite Vehicle storage is allowed under this MUP per HGMC 8.70.060 and is limited to a maximum of thirteen (13) vehicles (ie. boats, trucks, trailers, etc.) for overnight storage at any given time in the designated display area. Any increase in storage of vehicles/boats/trucks/trailers beyond thirteen (13) would require additional MUP review and approval of a new (or modified MUP) for vehicle storage.

21. The outdoor storage/equipment area identified on the approved site plan shall be fully screened with view-obscuring fencing and gate, and landscaping, so that the storage/equipment is not visible from public right-of-way and adjacent properties.

The access gate to this storage area shall remain closed when not accessing the area. Such equipment area shall only contain the following items: boat trailers for sale, equipment dollies, hand-trucks, and trailer mules for sale and for use onsite moving boats.

22. No hazardous materials (ie. gasoline, propane, oil) shall be stored on the premises.

23. Minor changes to the site plan shall be reviewed by the Community Development Director, and approved if acceptable. Major changes to the site plan or operation shall require the submittal of a new application (or Modification to the MUP) and plans to the Planning Department.

24. All signs require separate permits, subject to the review and approval by Planning and Building Divisions. The applicant shall obtain all applicable permits.

Approval of these plans does not imply approval of any signage.

25. The new trash enclosure shall be provided per HGMC 18.70.030, and shall meet all City and Commercial Waste requirements. The trash enclosure design, colors, and materials shall be consistent and compatible with the other structures on the site. Trash must be picked up as necessary to ensure that the trash enclosure has adequate space to accommodate the needs of the site. No trash storage/disposal shall be placed in the public right of way.

26. All new onsite utilities shall be provided underground.

27. This Minor Use Permit may be reviewed and reconsidered by the Director of Community Development and/or City Council at any time for the purpose of imposing new conditions to mitigate a nuisance or to revoke the permit to abate a nuisance.

28. Any questions of intent or interpretation of any conditions shall be resolved by the Case Number PLNG2024-0011-MUP Page 4
October 22, 2025
Director of Community Development.

29. It is not the intent of this approval to supersede and or replace any previously approved entitlements and associated conditions for the subject property. The Director of Community Development shall have the discretion to determine which conditions shall apply should conflicts arise between this approval and any other entitlements on the property.

30. These terms and conditions shall be perpetual, for the approved use only. All conditions for this use shall also bind all future owners and possessors of the subject property to the terms and conditions.

31. Plans shall be submitted to LA County Fire Prevention - Land Development Unit for review and compliance with all applicable codes and regulations, subject to review and approval by LA County Fire Department.

32. In the event that the herein specified entitlement and operation (Case No.

PLNG2024-0011-MUP) is not implemented within one (1) year from the date of approval of this application, such approval shall automatically become null and void.

33. The Subdivision Improvement Agreement shall be executed and recorded, subject to the satisfaction of the Community Development Director.

34. Owner/Applicant shall fully indemnify, protect, defend, and hold harmless the City of Hawaiian Gardens (City) and the City’s agents, officers, employees, and attorneys (collectively, “Indemnified Parties”) from and against any and all actual or alleged claims, actions and/or proceedings against the Indemnified Parties by third-parties that relate to or arise from any approval of the Project or any related approvals, including but not limited to (i) any California Environmental Quality Act (“CEQA”) approvals, findings, and/or determinations, (ii) the approval of any permits (including any conditional use permits), variances, plot plans, design plans, maps (including any tentative parcel maps), licenses, or amendments, (iii) any challenge to the reasonableness, legality or validity of any of the conditions set forth herein, and (iv) any other approvals or actions taken by the Indemnified Parties relating to the project (collectively, “Approvals”). The owner/applicant’s indemnification obligation shall include, but shall not be limited to, any and all future third-party claims, actions, and/or proceedings against the Indemnified Parties (i) which seek to attack, set aside, void, or annul any of the Approvals; and/or (ii) which seek damages (including, without limitation, special and consequential damages and punitive damages) allegedly related to or arising from the Approvals (collectively, “Claims”). The owner/applicant’s indemnification obligation shall further include, but shall not be limited to, any damages, fees (including attorney’s fees), and or/costs either awarded against and/or incurred by the Indemnified Parties in connection with the Claims.

Case Number PLNG2024-0011-MUP Page 5
October 22, 2025

35. Freedom Boat Club / Surf City Boats, Inc. shall obtain a business license and adhere to HGMC Chapters 5.04 and 5.06.

Building Department

1. The second sheet of building plans is to list all conditions of approval and to include a copy of the Planning Decision letter. This information shall be incorporated into the plans prior to the first submittal for plan check.

2. Fees shall be paid to the County of Los Angeles Sanitation District prior to issuance of the building permit.

3. In accordance with paragraph 5538(b) of the California Business and Professions Code, plans are to be prepared and stamped by a licensed architect.

4. Structural calculations prepared under the direction of an architect, civil engineer or structural engineer shall be provided.

5. South Coast Air Quality Management District must be contacted prior to any demolition or renovation. Call (909) 396-2000 for further information. Failure to comply with the provisions of Rule 1403 may result in a penalty of up to $25,000 per day.

6. A geotechnical and soils investigation report is required. Prior to permit issuance a PDF copy of the soils report shall be provided by the applicant.

7. The owner shall retain the soils engineer preparing the Preliminary Soils and/or Geotechnical Investigation accepted by the City for observation of all excavation and compaction testing. Observation and testing shall not be performed by another soils and/or geotechnical engineer unless the subsequent soils and/or geotechnical engineer submits and has accepted by the Public Works Department, a new Preliminary Soils and/or Geotechnical Investigation.

8. All State of California disability access regulations for accessibility shall be complied with.

9. Electrical plan check is required.

10. Mechanical plan check is required.

Engineering Division

1. Prior to submitting the final map to the City Public Works Department for examination, the owner/applicant shall obtain clearances from all affected Departments and Division, for the following mapping items: mathematical accuracy, survey analysis, and correctness of certificates, signatures, etc.

Case Number PLNG2024-0011-MUP Page 6
October 22, 2025

2. Prior to submittal of a final map, the owner/applicant shall pay all fees required to review documents and plans for final map clearance.

3. A final parcel map prepared by, or under the direction of a Registered Civil Engineer authorized to practice land surveying, or a Licensed Land Surveyor, must be processed through the City Engineer's office prior to being filed with the County Recorder.

4. A preliminary subdivision guarantee is required showing all fee interest holders and encumbrances. An updated title report shall be provided before the final tract/parcel map is released for filing with the County Recorder.

5. If applicable, monumentation of parcel map boundaries, street centerline and lot boundaries is required for a map based on a field survey.

6. Final parcel map shall be filed with the County Recorder and one (1) mylar copy of filed map shall be submitted to the City Engineer's office prior to issuance of building permits.

7. If applicable, the project shall comply with all requirements of the Subdivision Map Act.

8. The property shall be graded to drain to the street or approved easement, but in no case shall such drainage be allowed to sheet flow across the public sidewalk. A grading and/or drainage plan prepared by a licensed civil engineer shall be submitted to and approved by the Building Official/City Engineer, and such grading and drainage shall take place in accordance with such approved plan.

9. Per the Subdivision Improvement Agreement, the Permittee shall dedicate street easements, storm drain easements, public utility easements, sewer easements, bikeway easement or other identified easement to the satisfaction of the City Engineer. The Permittee shall hire a Civil Engineer or Land Surveyor to prepare the legal description for the easement to be dedicated and shall the use the forms provided by the City. A street dedication at Tilbury Street shall be dedicated to the City to accommodate a full-width sidewalk and the completion of the circular cul-de-sac.

10. Water service facilities, including appropriate backflow prevention devices, shall be installed to the satisfaction of the Building Official.

11. Sanitary sewer facilities shall be installed to the satisfaction of the City Engineer.

12. If applicable, the owner/applicant shall submit a copy of the sewer plans to the Case Number PLNG2024-0011-MUP Page 7
October 22, 2025
City and to the Los Angeles County Department of Public Works for review.

Show sewer connections on site plan.

13. Grading and drainage plans must be approved to provide for contributory drainage from adjoining properties as approved by the City Engineer, including dedication of the necessary easements. A grading and drainage plan must be provided for this property to have an independent drainage system to the public street, to a public drainage facility, or by means of an approved drainage easement. Historical or existing storm water flow from adjacent lots must be received and directed by gravity to the street, a public drainage facility, or an approved drainage easement. Plans must be stamped by a registered civil engineer.

14. Offsite improvement plans must be approved by City Engineer and stamped by a register civil engineer.

15. Applicant shall install ADA compliant curb ramp at the southwest corner of Tilbury Street and Claretta Avenue. The existing tree and planter adjacent to the ramp shall be removed.

16. Applicant shall install ADA driveway along Claretta Avenue and replace adjacent parkway drain if damaged.

17. The gate located along Claretta Avenue shall be offset 20 feet from the street property line and shall be an electronic opening and closing gate per satisfaction of the Community Development Department, and Public Works.

18. The applicant shall construct new sidewalk on Tilbury Street to accommodate the street widening for the dedication to build the full cul-de-sac and the sidewalk shall extend to the intersection at Tilbury Street and Claretta Avenue.

19. The applicant shall construct a new decorative block wall along Tilbury Street to accommodate the new cul-de-sac extension. Such wall shall be constructed per Code under separate permit, subject to review and approval by Community Development and Public Works.

20. ADA parking stalls to be included onsite per Planning Department parking count requirement.

21. Pursuant to HGMC Chapter 6.47, the Permittee shall comply with the National Pollutant Discharge Elimination System (NPDES), the requirements of the Regional Water Quality Control Board, the Los Angeles County MS4 Permit and the City of Hawaiian Gardens.

22. The Permittee shall pay all fees and charges in place related to report review and implementation, plan checking, and any field inspections.

Case Number PLNG2024-0011-MUP Page 8
October 22, 2025

23. The Applicant shall submit a drainage report if applicable. Hydrologic and hydraulic calculations demonstrating adequate site drainage from a 25-year return frequency storm (50-year frequency in sump areas) prepared by a Registered Civil Engineer shall be submitted with the Grading Plan. The report shall conform to the requirements of the latest edition of the Los Angeles County Hydrology Manual. If a drainage report is not applicable, a drainage memo shall be supplied to the City for review to show there are no impacts to the drainage systems.

24. The plans shall be checked and stamped for approval by the city engineering Division before building permits area issued. Project must comply with all Public Works requirements. All Public Works notes and corrections must be printed on the plan, and all requirements must be completed per the approved plans prior to the issuance of a building final.

25. A City public works permit shall be taken out for all work in public right-of-way before starting work. All work shall be done in accordance with APWA Standards and to the satisfaction of the City Engineer and must be completed before issuance of Certificate of Occupancy. Utility trenches in the street rightof-way shall have pavement restoration per City Engineer.

26. A bond or surety device shall be posted with the City in an amount and type sufficient to cover the amount of off-site and on-site work to be done, as approved by the City Engineer.

27. Pad certification by the Design Civil Engineer and Soil Engineer is required prior to the commencement of structural construction.

28. The final compaction report prepared by a qualified Soil Engineer shall be submitted to the City Engineer for review and approval before the commencement of structural construction.

29. The Applicant shall submit a Geotechnical Report for review.

30. All driveways, sidewalk and ADA Ramp shall meet current ADA requirements.

Improvements to be done per City Standards.

31. All existing off-site public improvements (sidewalk, curb & gutter, driveways, and street paving) at the development site, or adjacent to, which are in a damaged condition or demolished due to the proposed work shall be reconstructed to the satisfaction of the City Engineer and per City Standards.

32. Subdivision Improvement Agreement must be executed prior to approval of grading and building permits.

← All documents from this meeting