LOCKSMITH

MOBILE SERVICES
1&] Locksmith

ESTIMATE
Client: Job Site: Date:

City Of Hawthorne 3851 W El Segundo Blvd 05/01/2024
Hawthorne Ca 90250
COST 28,700.00
>>>SCOPE OF WORK <<<
Furnish & Install New 6'-0 × 8'-0 PAIR of Storefront
Doors and Frame with Door Hardware, as follows
STOREFRONT FRAMING:
6'-0 × 8'-0 "U" Up and Over Frame, 1-3/4" x 4-1/2"
Profile, prep for OHC Closer & International OP4000
3/4" Offset Pivots, 10" × 1/2" Threshold, all Clear
Anodized Finish
STOREFRONT DOORS & HARDWARE:
6'-0" x 8'-0 PAIR of Storefront Doors, Medium Stile,
International OP4000 3/4" offset Pivots, NO LOCK
PREP, PREP ONLY for OHC closer with offset arm, Mid-
Panel Mullion for divided lite (2pcs glass per door),
1/4" glazing, 10" offer pulls (exterior only), 2 door
bottom sweep seals, all Clear Anodized Finish
Von Duprin 99 EO push Bars For Doors, Center Mullions
With removable Kits
NEW GLASS: 1/4" Clear Tempered Glass
This work is to include removal and disposal of existing storefront doors, door framing, threshold, floor closers, and glass. Back fill existing holes in sill due to existing closers with concrete. Preparing of existing rough
opening and compete furnishing & installation of
materials noted above.
>>>ADD / ALT<<<
OPTION-1:

ADDITIONAL COST to Upgrade to CRL Heavy Duty 3/4"
Offset Pivots, including Top, 2 intermediate, and 1
Bottom Pivot
Add $1,250 per opening x 2 Openings = $2,500 total
additional cost

CHECK HERE TO SELECT ()
50% Deposit 2/3 Weeks Lead Time 1 or 2 Day
Installation

ATTENTION ANY EXTRA WORK NEED ONCE WE

PULL OFF FRAME WILL BE ADDED TO INVOICE IE
NEEDED