Cities Index.
Inv_202118138_from_Huntington_Beach_Electric_Inc_7372

Hawthorne City Council
July 9, 2024

Document
Inv_202118138_from_Huntington_Beach_Electric_Inc_7372
Meeting
July 9, 2024
Body
Hawthorne City Council
Original file
1.8 MB
Text extracted from the city's file for reading and search. Open the original on cityofhawthorne.primegov.com. That file is the official record.

Invoice
Date
2/15/2024
Invoice #
2021-18-138
Bill To

CITY OF HAWTHORNE
4455 W 126TH STREET

HAWTHORNE CA
Huntington Beach Electric Inc
PO BOX 1626
HUNTINGTON BEACH, CA 92647
P.O. No.

Phone #
714-264-9522
Fax #
714-276-6418
E-mail
[email protected]
Web Site
WWW.DONTPANICBRO.COM
Total
Item Description Qty Serviced Amount Address of work
16 Electrical & ... Electrical & Lighting AVIDEX CHANGE 3/27/2024 ORDER 125505-
1 9,146.92 CITY HALL CHAMBERS
16 Electrical & ... Electrical & Lighting AVIDEX CHANGE 5/14/2024 ORDER-128834
1 5,264.90 CITY HALL CHAMBERS
16 Electrical & ... Electrical & Lighting- HUNTINGTON 6/7/2024

BEACH CHANGE ORDER - LIGHT

POLE WIRING, EXCAVATION,

CONDUIT, WIRING,
7 26,600.00 JIM THORPE PARK
16 Electrical & ... SWITCHGEAR MODIFICATIONS 7/2/2024
UPGRADES 400A TRO 600A
1 13,140.00 JIM THORPE PARK
16 Electrical & ... Electrical & Lighting - Electrical & 7/2/2024 Lighting- HUNTINGTON BEACH

CHANGE ORDER - CIVIL

TRENCHING CONCRETE
2 4,400.00 JIM THORPE PARK
$58,551.82

HUNTINGTON BEACH ELECTRIC INC
CHANGE ORDER REQUEST #2 06/02/24
Eric D. Bridge, PE
Professional Electrical Engineer #E-21037
Huntington Beach Electric C-10 #1009482
714-264-9522
www.huntington-beach-electric.com

CITY OF HAWTHORNE, CA
4455 W. 126th Street
CO REQUEST#2 JIM THORPE PARK CHANGE ORDER REQUEST

1. ISSUE
a. THE CITY HAS REQUESTED THAT THE SWITCHGEAR IS
UPGRADED FROM 400A TO 600A.
b. THE CITY HAS REQUESTED REPAIRING THE WIRING ON THE

BALLFIELDS

2. PROPOSED SOLUTION
a. SWITCHGEAR
i. INSTALL 600A SWGR PER APPROVAL DRAWINGS
ii. ADDITIONAL $13,140 INCLUDES TAX
b. BALLFIELDS
i. TRENCH AND INSTALL NEW 3/4" UNDERGROUND
CONDUIT AND #12 AWG CABLE BETWEEN POLES THAT
ARE NOT OPERATING. INSTALL FIELD FUSES IN PULL
BOXES. REPLACE CONTACTORS IN EXISTING SWGR AS
NEEDED, AS THEY HAVE FAILED.
ii. $3,800 PER LIGHT POLE PAIR (7) TOTAL

1. $2,200 PER CIVIL CONCRETE WORK (2) TOTAL

JIM THORPE PARK
TOTAL CHANGE ORDER $44,140.00 this c.o.
$14,411.82 avidex
total $58,551.82
________________________________________
ACCEPTED BY: DATE:
____________________

← All documents from this meeting