Cities Index.
Attachment II EV Charging Requirements

Council Sustainability Committee
March 14, 2022

Document
Attachment II EV Charging Requirements
Meeting
March 14, 2022
Body
Council Sustainability Committee
Pages
4
Original file
257 KB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar1.com. That file is the official record.

ATTACHMENT II

Electric Vehicle Charger Types

Level 1

15-20 Amp, 120 Volt (standard household
outlet)
Driving Distance provided: 3-4 miles/hour
Low Power
Level 2

20 Amp, 208/240 Volt
Driving Distance provided: 10-15
miles/hour
High Power
Level 2

40+ Amp, 208/240 Volt
Driving Distance provided: 25-30
miles/hour
DC Fast
Charge

80-400 Amp, 200-600 Volt DC (direct
current)
Driving Distance provided: 125-1000
miles/hour

Page 2 of 4 ends

EV Charging Infrastructure
EV Capable

Raceway (conduit), electrical capacity
(breaker space)
EV Ready

EV Capable + overcurrent protection
devices, wiring and outlet (i.e. full
circuit)
EVCI (electric
vehicle
charger
installed)

All equipment to deliver electricity to
EV
(aka EVSE = electric vehicle supply
equipment)

Page 3 of 4 ends

Existing & Potential EV Charging Requirements

2019
CalGreen
Hayward’s
Current Reach
Code
(% of dwelling
units)
2022 CalGreen
(% of parking
spaces)
Model Reach Code
(potential
requirements)
Multi-
Family
≤20
dwelling
units
10% of units
must have
one Level 2
EV Capable
space
100% Level 2
EV Ready
space
10% Level 2 EV
Capable
25% low power
Level 2 EV Ready
(35% total)
40% high power Level 2
EVSE
60% Level 1 EV Ready
(100% total)

Multi-
Family
>20
dwelling
units
10% of units
must have
one Level 2
EV Capable
space
75% Level 2 EV
Ready space;
and
25% Level 2 EV
Capable space
10% Level 2 EV
Capable
25% low power
Level 2 EV Ready
5% high power
Level 2 EVSE
(40% total)
40% high power Level 2
EVSE;
and
60% Level 1 EV Ready
(100% total)
Multi-
Family
Affordable
Housing

NA NA NA
15% high power Level 2
EVSE;
25% low power Level 2
EV Ready
60% Level 1 EV Ready
(100% total)
Hotel/
Motel NA NA NA
5% Level 2 EVSE;
and
25% low power Level 2
EV Ready

Page 4 of 4 ends

Existing and Potential EV Charging Requirements

2019
CalGreen
Hayward’s
Current Reach
Code
2022 CalGreen
Model Reach Code
(potential
requirements)
Single
Family &
Townhome
One Level 2
EV Capable
for one
parking
space per
dwelling
unit
Two Level 2 EV
Ready spaces
per dwelling
unit
No changes One Level 2 EV Ready
space

One Level 1 EV Ready
space

Non-Res
Office
6% Level 2
EV Capable
(for
buildings
with at least
10 parking
spaces)
20% Level 2 EV
Charger
Installed (for
buildings with
at least 10
parking spaces);

and
30% of spaces
must be EV
Capable
5% Level 2 EVCS;
and
10% Level 2 EV
Capable (for
buildings with at
least 10 parking
spaces)????
20% Level 2 EV
Charger Installed;
and
30% of spaces must
be Level 2 EV Capable
Non-Res
Non-Office
15% Level 2 EV
Charger
Installed
(for buildings
with at least 10
parking spaces)
10% Level 2 EV
Charger Installed;
and
10% of spaces must
be Level 2 EV Capable

← All documents from this meeting