Cities Index.
Presentations

Council Infrastructure Committee
June 16, 2022

Document
Presentations
Meeting
June 16, 2022
Body
Council Infrastructure Committee
Original file
4.1 MB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar.com. That file is the official record.

Special Council Infrastructure
Committee Meeting
Main Street Complete Streets Update
June 16, 2022
Public Works & Utilities Department
1 Main Street Complete Streets
-
CIC Meeting
- Review Concept 4, which incorporates feedback and concerns from the community - Review estimated construction costs for Concept 4
- Recommendations & Next Steps
- Questions & Discussion
2 Main Street Complete Street
–
Public Meetings & Outreach
• July 24, 2017 CIC meeting: staff presented 3 design concepts for feedback and comments. • January 22, 2020 CIC meeting: staff re-introduced the 3 design concepts. • February 26, 2020: staff met with Fire and Police department to review design concepts and received feedback. • June 22, 2020 Virtual Community meeting: staff reviewed 2 design concepts (1 & 2) with public. • June 22, 2020: received design concept feedback and bus stop design recommendations from AC Transit. • July 15, 2020 DHIA meeting: staff reviewed 2 design concepts (1 & 2). • July 22, 2020 CIC meeting: staff presented design alternatives suggested by the community members and staff analysis and reviewed design concepts 1 & 2. Committee narrowed it down to Concept 1 with exception. • October 28, 2020 CIC meeting: staff presented an updated project cost estimate and alternative scope of work to the CIC. • March 16, 2021: Council approved a resolution to enter into an agreement with CSW/ST2. 3 Main Street Complete Street
–
Public Meetings & Outreach (continued)
• April 28, 2021 CIC meeting: staff presented a project cost estimate for Concept 1 along with an alternative. • January 26, 2022: virtual meeting with the DHIA and Chamber to present Concept 4 for feedback. • April 27, 2022: coordinated with Fire department and AC Transit to review Concept 4 and receive feedback. • May 5, 2022: staff met with local businesses at the project site for an in-person meeting to present Concept 4 for feedback. 4 Main Street Complete Streets
–
Existing Conditions
5 Tree root damage to sidewalk Street pavement cracking Mid-block crossing Un-necessary red curbs
Main Street Complete Streets
–
CIC Meeting
Concept 4
6 Proposed Improvements and Amenities from A Street to C Street • Center left turn lane & delivery truck loading
• New decorative sidewalks
• New bulb-outs at curb returns
• Decrease pedestrian crossing distance and increase safety • Increase pedestrian signal timing to allow seniors to cross safely • Pedestrian refuge area at A Street and Main Street
• New rapid flashing beacon system at two mid-block pedestrian crossings • New streetlights
• New street trees
• Repair and re-pave the street
• Re-stripe and re-sign existing loading zones
• Remove un-necessary red painted curbs to add parking
• Enhance AC Transit bus stop at B Street
• New Big Belly trash and recycling receptables
• New bike lanes with buffer and high visibility striping Main Street Complete Streets
–
CIC Meeting
Concept 4
7 Main Street Complete Streets
–
CIC Meeting
Concept 4
8 A Street to B StreetA Street B Street

Main Street Complete Streets
–
CIC Meeting
Concept 4
9 Intersection of Main Street & A Street
Main Street Complete Streets
–
CIC Meeting
Concept 4
10 Intersection of Main Street & B Street

Main Street Complete Streets
–
CIC Meeting
Concept 4
11 B Street to C StreetB Street C Street

Main Street Complete Streets
–
CIC Meeting
Concept 4
12 Intersection of Main Street & C Street

Main Street Complete Streets
–
CIC Meeting
Concept 4
13 Proposed Improvements and Amenities from C Street to D Street • Center left turn lane & delivery truck loading
• New bulb-out at C Street curb return
• Decrease pedestrian crossing distance and increase safety • Increase pedestrian signal timing to allow seniors to cross safely • New street trees
• Repair and re-pave the street
• Repair damaged sidewalk
• Re-stripe and re-sign existing loading zones and curb paint • New Big Belly trash and recycling receptables
• New bike lanes with buffer and high visibility striping Main Street Complete Streets
–
CIC Meeting
Concept 4
14 C Street to D StreetC Street D Street

Main Street Complete Streets
–
CIC Meeting
Concept 4
15 Proposed Improvements and Amenities from A Street to McKeever Avenue • Center left turn lane & delivery truck loading
• New bulb-outs at curb returns at A Street
• Decrease pedestrian crossing distance and increase safety • Increase pedestrian signal timing to allow seniors to cross safely • New street trees
• Repair and re-pave the street
• Repair damaged sidewalk
• Re-stripe and re-sign existing loading zones and curb paint • New Big Belly trash and recycling receptables
• New bike lanes with buffer and high visibility striping Main Street Complete Streets
–
CIC Meeting
Concept 4
16 A Street to McKeever AvenueMcKeever
Avenue
A Street
Levine Court
Main Street Complete Streets
–
CIC Meeting
Estimated Project Costs
17 Funding Summary
OBAG Grant $1.7 Million
City of Hayward Contribution $550,000
Safe Routes for Seniors $1.0 Million
Total Funds Available $3.25 Million

Main Street Complete Streets
–
CIC Meeting
Recommendations
-Staff recommends the Committee receive public comments and provide feedback on Concept 4 -Authorize staff to prepare construction documents utilizing Concept 4.

Next Steps
-Take direction from the committee and move forward accordingly 18 Questions & Discussion
?
!
19 Main Street Complete Streets
–
CIC Meeting

← All documents from this meeting