Cities Index.
Attachment III Exterior Concept Design Review

Council Infrastructure Committee
January 25, 2023

Document
Attachment III Exterior Concept Design Review
Meeting
January 25, 2023
Body
Council Infrastructure Committee
Original file
5.3 MB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar1.com. That file is the official record.

November 30th, 2022
WPCF Administration Building
Exterior Concept Design Review

ATTACHMENT III
2 Agenda

1. Building Layout Overview & City Comments – 30 min

2. Building Exterior Design Concept – 30 min

3. Landscape Design Concept – 30 min

4. Next Steps
Brown and Caldwell 3
N

VISITOR
PLAZA

UTILITY
POLES

VISITOR

PARKING
COGEN

BUILDING
12KV

BUILDING

ELECTRICAL

DUCT BANKS

OVERHEAD POWER LINE
EASEMENT 100’

ADMIN/LAB

BUILDING SITE
Site Plan
LAB
ENTRY
STAFF
ENTRY
PUBLIC
ENTRY
STAFF

PARKING

NEW ADMINISTRATION

BUILDING
First Floor Plan
4 N

AMMONIA
350 sf

MICRO /
H20
470 sf
SAMPLE

RECEIVING
320 sf
MECH
350 sf

WASH / STOR
490 sf
DI
GAS

LAB STOR
420 sf
LAB

RECORDS
100 sf
LIMS
COPY /
MTG /
PRINT
180 sf

NUTRIENT
470 sf

MAIN LAB
715 sf

OPS LAB
260 sfWORKSTATIONS
520 sf
LOBBY
ADMIN
200 sf
ELEV

ELEVATOR

CONTROL
WOMEN’S

LOCKER ROOM
700 sf
MEN’S LOCKER
ROOM
1050 sf

HEALTH /

WELLNESS
400 sf

LAUNDRY

UNIFORM
200 sf
MUD
ROOM
160 sf
PPE
RR
0’ 10’ 30’
JAN

PROJECT AREA
260 sf

METALS /

MERCURY
590 sf DIGESTION
470 sf

STAFF ENTRY

PUBLIC ENTRY

LAB ENTRY

STAFF ENTRY
13,200sf
21,800sf total
Second Floor Plan
5 N
0’ 10’ 30’

INTERPRETIVE
CENTER 380 sf

BREAK ROOM
640 sf
ELEC
420 sf

STORAGE
260 sf

STORAGE
125 sf
FILES
OFFICE
180 sf
OFFICE
200 sf
OFFICE
170 sf
OFFICE
170 sf
OFFICE
170 sf
OFFICE
280 sf
OFFICE
160 sfIT
90 sf
SCADA
275 sf

CONTROL
ROOM
500 sf

ELEVATOR
RR
RR

TRAINING ROOM
685 sf

MEETING
ROOM
323 sf

PRIVACY
100 sf

JANITOR
100 sf
COPY /
PRINT
170 sf

LAB COUNTER AND DISPLAYS
1,000sf potential expansion
8,600sf
21,800sf total
Design Inspiration
Brown and Caldwell 6
INTERSECTION OF EARTH’S NATURAL ELEMENTS
Biophilic
Interiors
Brown and Caldwell 7

INCORPORATING NATURE INTO

THE INDOOR ENVIRONMENT
View 1
8 Southwest from Whitesell

GRADATED CURTAIN WALL
FAÇADE BRINGS GENEROUS

DAYLIGHT INTO OFFICES

UPPER FLOOR BOWS OUT

BEYOND THE GROUND

FLOOR VOLUME

VISITORS DRAWN TOWARDS

LOBBY BETWEEN LAB AND

SUPPORT VOLUMES
N

PRIMARY BUILDING

SIGNAGE

STAFF ENTRY GATE
EXISTING 12kV

BUILDING
View 2
9 Northwest from Existing Plant Gate

ARTICULATED TERRACOTTA

VOLUME HIGHLIGHTS THE

LAB FUNCTIONS

RECTANGULAR WINDOWS IN LAB

FOR CONTROLLED DAYLIGHT
N

SLOT WINDOWS FOR BALANCE

OF DAYLIGHT AND PRIVACY IN

BREAK AND TRAINING ROOMS

UPPER FLOOR BOWS OUT

BEYOND THE GROUND

FLOOR VOLUME
View 3
10 Northeast from Plant

OPERABLE METAL FINS

SCREEN ROOFTOP MECH

EQUIPMENT

METAL FINS PROVIDE

CONTROLLED WESTERN DAYLIGHT

TO CONTROL ROOM

TEXTURED ARRANGEMENT

OF TERRACOTTA PANEL

SHAPES AND SIZES
N

OPPORTUNITY FOR ROOFTOP

BALCONY OVERLOOING PLANT

METAL CANOPY OVER LAB

SAMPLE RECEIVING
View 4
11 Southeast from Plant
N

GRADATED CURTAIN WALL
FAÇADE BRINGS GENEROUS

DAYLIGHT INTO OFFICES

STAFF ENTRANCES RECESSED

INTO GROUND FLOOR

OPERABLE METAL FIN

MECH SCREEN

PRECISE COMPOSITE METAL

PANELS BALANCE ORGANIC

TERRACOTTA BAGUETTES

UPPER FLOOR BOWS INSIDE

THE GROUND FLOOR VOLUME
EXISTING 12kV

BUILDING
Metal Wall Panels
Brown and Caldwell 12
Composite aluminum panels create a precise, modern skin

Terracotta Wall Panels
Brown and Caldwell 13
Warm, familiar material with natural colors and variety of shapes and textures

Curtain Wall Glazing
Brown and Caldwell 14
Transparent and opaque glass in floor to roof panels to maximize views and daylight

Exterior Color Options
15 East Elevation
South Elevation
Natural Terracotta
Silver Metal
Silver Metal
Natural Terracotta
Tan Terracotta
Grey Metal
- Whitesell St - Lab Entry
OPT 1
OPT 2
OPT 3
Exterior Color Options
16 West Elevation North Elevation
Natural Terracotta
Silver Metal
Silver Metal
Natural Terracotta
Tan Terracotta
Grey Metal
- Plant Side - Visitor Entry
OPT 1
OPT 2
OPT 3
RHAA Landscape Architecture & Planning 17
Site Features

1. Drop-Off Area

2. Rest Points

3. Building Entry

4. Amphitheater Seating
The landscape design
provides a clear path of travel
from the parking area to the
building entry, while also
offering moments to pause
along the way.

Landscape elements interpret
the administrative building’s
architectural theme of flow
through the use of varied
paving materials, site
furnishings, and native
planting.

N
1 Site Plan
2 4
3 2
18 Drop-Off Area
RHAA Landscape Architecture & Planning
The drop-off area introduces the design
theme of flow, connecting visitors to a
path that brings visitors to the building
entrance. The area features native
planting, seating, and special paving to
provide a sense of arrival.

N
Rest Points
19 N
Rest points along the path with site
furnishings such as seating and
interpretive signage, invite pedestrians to
pause for a few moments while also
creating destinations that pull visitors
along the path.

RHAA Landscape Architecture & Planning

Building Entry
20 N
An entry plaza flows into the building
lobby connecting the interior and the
exterior
RHAA Landscape Architecture & Planning
21 N
A small amphitheater, framed by a change in
paving, offers a space to pause longer –
perhaps for lunch, a coffee break, or a
meeting outdoors when the weather is nice.

Amphitheater
Seating
RHAA Landscape Architecture & Planning
Next Steps
22 Questions?
Thank You!

← All documents from this meeting