Cities Index.
Attachment IV CMO FY24 Master Fee Schedule Changes

Hayward City Council
March 21, 2023

Document
Attachment IV CMO FY24 Master Fee Schedule Changes
Meeting
March 21, 2023
Body
Hayward City Council
Pages
5
Original file
3.4 MB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar1.com. That file is the official record.

Office of the City Manager
Housing Division
777 B Street, 4
th Floor
Hayward, CA 94541-5007
T: 510.583.4454 | F: 510.583.3650 | www.hayward-ca.gov
Interoffice Memorandum
DATE: February 23, 2023
TO: Nicole Gonzales, Acting Director of Finance
THROUGH: Christina Morales, Housing Manager
FROM: Dustin Claussen, Assistant City Manager
SUBJECT: FY 24 Master Fee Schedule Update
The
Housing Division under the City Manager’s Office is tasked with servicing residential and rental housing development loans and administering the resale restrict ions related to the City’s Below Market Rate (BMR) housing portfolio as well as the administration and compliance of the Affordable Housing Ordinance (AHO), Residential Rent Stabilization and Ten ant Protection Ordinance (RRSO) and Tenant Relocation Assistance Ordinance (TRAO), including th e collection of fees related to each ordinance.

The division was previously under the City Manager’s Office but is moving under the Development Services Department (DSD) in FY 2024 to consolidate divisions t hat work on projects and programs related to housing and development under one department in order to streamline customer care and delivery of services to the Hayward community.

Because Housing Division is transferring, we are requesting the creation of a “Housing” section under Development Services Department in the Master Fee Schedule and m o v i n g t h e R e n t S t a b i l i z a t i o n Administration Fee and Loan Servicing Fee to this section. We a re also requesting an update to the user fee amount for Housing staff under the Loan Servicing Sect ion from $95 to $122 based on the last User Fee Study Report conducted by the City in 2016. Lastl y, Housing Division is requesting the addition of a Tenant Relocation Assistance Ordinance Hearing Fe e be added to the newly created Housing Section to standardize this type of fee across the City and allowable under the TRAO.

All changes related to this request have been added to the atta ched Proposed FY 2024 Master Fee Schedule PDF as directed by Finance. Please contact [email protected] with any questions about these changes.

DEVELOPMENT SERVICES DEPARTMENT
B. Planning
Item 40 – Af
fordable Housing In‐Lieu Fee

ATTACHMENT IV

Office of the City Manager
Housing Division
777 B Street, 4
th Floor
Hayward, CA 94541-5007
T: 510.583.4454 | F: 510.583.3650 | www.hayward-ca.gov

The Affordable Housing In-Lieu Fees have always been listed und er Planning and will remain in this section. This fee is increased 8.4% based on the ENR report and is authorized under Section 4 of Resolution 17-167.

E. Housing – new section requested

1. Rent Stabilization Administration
a. Annual Fee per Rental Unit $19.00
b. Annual Fee per Covered Rental Unit $40.00
c. Annual Fee per Mobilehome Space $5.00

The fees set forth herein shall be payable immediately and shal l be delinquent if not received by the Housing Division on or before 5 pm on August 31, 2023 for Residential and Mobile-home.

2. Tenant Relocation Assistance Ordinance Hearings
a. Hearing fee: Administra tive, Special Assessment,
Administrative Citation, and Lien Hearings
$946.00 Per Hearing

3. Loan Servicing
a. General
i . Title Report Actual Costs Per Report
ii. Property Appraisal Report Actual Costs Per Report iii. Recording Fee Actual Costs or
$50.00 Min.

Per Document
i v . Public Document Preparation Fee $100.00 Per Document

b. Homeownership Loan Programs
i . Subordination Fee $600.00 Per Transaction
ii. Late Payment Fee The greater of 6%
or $5.00 Min.

Monthly Loan Payment
after 15 days

c. Below Market Rate Program Fees
i . Subordination Fee $600.00 Per Transaction
ii. Resale Fee 0.5% Purchase Price
iii. Exercise City Option to Purchase 3% Maximum Restricted Resale Price

d. Affordable Rental Housing
i . Loan Modification Fee Actual Costs Time and Materials¹ ii. Subordination Fee Actual Costs Time and Materials¹ iii. Monitoring Fee $50.00 Per Unit
i v . Resale Fee Actual Costs Time and Materials¹
v . Legal Fee Actual Co sts Per Transaction

Office of the City Manager
Housing Division
777 B Street, 4
th Floor
Hayward, CA 94541-5007
T: 510.583.4454 | F: 510.583.3650 | www.hayward-ca.gov

¹Cost may include but are not limited to: hourly rate for staff time, recording fees, legal fees, title reports, appraisals, and public noticing costs. Hourly rates ma y vary by department, but the hourly rate for Housing staff is $122.

Attached:

ENR Report
Resolution 17-167
Comprehensive User Fee Study Report dated October 12, 2016

Cc: Sara Buizer, Acting Direc tor of Development Services Christina Morales, Housing Manager
Amy Cole, Management Analyst
Tera Maroney, Management Analyst
City Cost Index - San Francisco - As of January 2023
The building and construction cost indexes for ENR's individual cities use the same components and weighting as those for the 20-city national indexes. The city indexes use local prices for portland cement and 2 X 4 lumber and the national average price for structural steel.

The city's BCI uses local union wages, plus fringes, for carpenters, bricklayers and iron workers. The city's CCI uses the same union wages for laborers.

To find more recent cost index data, go to this webpage (link below) and click on the link for the year you need, and then navigate to the week you need. Keep in mind that the city cost index figures are always published in the second weekly issue of the month. http://www.enr.com/economics/current_costs
Go back to view all City Indexes.

ENR COST INDEXES IN SAN FRANCISCO (1978-2022)
YEAR MONTH BCI %CHG CCI %CHG
2023 January 10205.32 +13.3 15498.78 +8.4
2022 December 9684.48 +8.4 14977.94 +5.3
2022 November 9819.99 +7.6 15113.51 +4.8
2022 October 9847.88 +7.5 15141.40 +4.8
2022 September 9789.74 +18.1 15083.26 +11.0
2022 August 9757.65 +14.5 15051.17 +8.9
2022 July 10346.61 +22.2 15640.10 +13.6
2022 June 10062.91 +23.2 15356.33 +14.1
2022 May 10033.57 +23.4 15326.99 +14.2
2022 April 9810.39 +24.8 15103.81 +14.8
2022 March 9833.42 +25.4 15126.84 +15.1
2022 February 9102.28 +16.5 14396.70 +9.8
2022 January 9007.82 +15.4 14301.24 +9.2
2021 December 8934.82 +13.5 14228.24 +8.0
2021 November 9127.62 +15.9 14421.03 +9.5
2021 October 9158.49 +16.3% 14451.91 +9.8%
2021 September 8290.40 +7.5 13583.81 +4.4
2021 August 8524.32 +11.8 13817.73 +6.9
Tweet ShareShare Share116
Like0
Privacy - Terms
YEAR MONTH BCI %CHG CCI %CHG
2021 July 8468.17 +11.2 13762.01 +6.6
2021 June 8165.26 +5.6 13459.10 +3.4
2021 May 8131.51 +8.1 13425.35 +4.7
2021 April 7863.57 +4.5 13157.41 +2.7
2021 March 7843.32 +4.3 13137.16 +2.5
2021 Feb 7816.32 +4.0 13110.16 +2.4
2021 Jan 7804.07 +3.9 13097.91 +2.3
2020 Dec 7874.92 +5.3 13168.76 +3.2
2020 Nov 7877.92 6.0% 13171.76 3.5%
2020 Oct 7874.17 +7.3 13168.01 +5.1
2020 Sept 7711.82 +6.0 13005.66 +5.2
2020 Aug 7626.76 +4.8 12920.60 +4.5
2020 July 7614.09 +4.9 12907.92 +4.5
2020 June 7728.87 +6.4 13022.70 +5.4
2020 May 7525.33 +3.9 12819.17 +3.9
2020 April 7522.83 +5.7 12816.67 +4.9
2020 March 7516.83 +8.1 12810.67 +6.3
2020 Feb 7513.83 +6.8 12807.67 +5.6
2020 Jan 7512.33 +7.0 12806.17 +5.7
2019 Dec 7479.68 +6.5 12764.52 +5.4
2019 Nov 7429.65 +5.9 12723.43 +5.1
2019 Oct 7341.15 +4.7 12524.93 +3.4
2019 Sept 7271.94 +3.7 12365.71 +2.2
2019 Aug 7274.44 +4.2 12368.21 +2.4
2019 July 7260.69 +4.2 12354.46 +2.5
2019 June 7260.69 +4.9 12354.46 +2.8
2019 May 7239.64 +4.6 12333.48 +2.7
2019 April 7228.39 +4.4 12322.23 +2.6
2019 Mar 6954.89 +0.5 12048.19 +0.3
2019 Feb 7038.07 +1.7 12131.37 +1.0
2019 Jan 7021.57 +1.4 12114.87 +0.8
2018 Dec 7022.07 +1.5 12115.37 +0.8
2018 Nov 7016.57 +1.4 12109.87 +0.8
YEAR MONTH BCI %CHG CCI %CHG
2018 Oct 7014.08 +1.3 12107.38 +0.8
2018 Sept 7010.58 +0.9 12103.88 +0.6
2018 Aug 6981.42 +0.5 12074.72 +0.3
2018 July 6966.67 +2.5 12050.97 +2.8
2018 June 6921.42 +1.9 12014.72 +2.5
2018 May 6921.42 +2.4 12014.72 +2.8
2018 Apr 6921.42 +2.3 12014.72 +2.7
2018 Mar 6921.42 +3.6 12014.72 +3.5
2018 Feb 6921.42 +3.6 12014.72 +3.5
2018 Jan 6921.42 +3.6 12014.72 +3.5
2017 Dec 6921.42 +3.6 12014.72 +3.5
2017 Nov 6921.42 +4.1 12014.72 +3.8
2017 Oct 6921.42 +4.1 12014.72 +3.8
2017 Sept 6945.92 +4.5 12037.27 +4.0
2017 Aug 6943.98 +4.8 12037.27 +4.2
2017 Jul 6796.47 2.6 11725.52 1.5
2017 Jun 6793.10 +2.6 11722.15 +1.5
2017 May 6761.99 +2.1 11691.03 +1.2
2017 Apr 6767.41 +2.1 11696.47 +1.2
2017 Mar 6680.37 +0.8 11609.44 +0.5
2017 Feb 6680.37 +4.2 11609.44 +3.9
2017 Jan 6680.37 +4.6 11609.44 +4.1
2016 Dec 6680.37 +4.6 11609.44 +4.1
2016 Nov 6650.28 +4.2 11579.33 +3.8
2016 Oct 6649.28 +4.0 11578.33 +3.8
2016 Sep 6647.28 +3.9 11576.33 +3.7
2016 Aug 6625.60 +3.70 11554.65 +3.60
2016 Jul 6626.10 +3.70 11555.15 +3.60
2016 Jun 6619.35 +3.60 11548.40 +3.50
2016 May 6621.35 +3.40 11550.40 +3.40
2016 Apr 6630.10 +3.50 11559.15 +3.50
2016 Mar 6628.85 +3.50 11557.90 +3.50
2016 Feb 6408.87 –0.10 11174.79 0.00
YEAR MONTH BCI %CHG CCI %CHG
2016 Jan 6387.49 –0.30 11153.41 –0.20
2015 Dec 6389.49 +2.30 11155.41 +2.20
2015 Nov 6390.46 +2.20 11154.06 +2.10
2015 Oct 6390.80 +2.40 11169.31 +2.40
2015 Sep 6395.22 +2.60 11158.82 +2.40
2015 Aug 6391.47 +2.60 11155.07 +2.40
2015 Jul 6391.47 0.00 11155.07 0.00
2015 Jun 6391.47 –0.22 11155.07 –0.13
2015 May 6405.72 0.00 11169.32 0.00
2015 Apr 6398.97 +2.8 11162.57 +2.5
2015 Mar 6405.72 +2.9 11169.32 +2.6
2015 Feb 6414.1 3 11177.7 2.6
2015 Jan 6409.56 2.9 11173.16 2.5
2014 Dec 6248.05 3.1 10915.84 5
2014 Nov 6252.05 3.1 10919.84 5
2014 Oct 6240.05 3.1 10907.84 5
2014 Sep 6230.55 3 10898.34 4.9
2014 Aug 6229.80 3.0 10897.59 4.9
2014 Jul 6229.80 3.0 10897.59 4.9
2014 Jun 6231.80 3.1 10899.59 4.9
2014 May 6228.05 3.1 10895.84 4.9
2014 Apr 6227.05 3.3 10894.84 5.0
2014 Mar 6224.05 3.3 10891.84 5.1
2014 Feb 6226.80 3.3 10894.59 5.1
2014 Jan 6228.55 3.5 10896.34 5.2
2013 Dec 6231.05 3.6 10898.84 5.3
2013 Nov 6233.30 3.5 10901.09 5.2
2013 Oct 6241.30 3.6 10909.09 5.2
2013 Sep 6047.27 0.4 10389.59 0.2
2013 Aug 6046.02 0.4 10388.34 0.2
2013 Jul 6048.77 0.2 10391.09 0.1
2013 Jun 6046.52 0.1 10388.84 0.0
2013 May 6040.77 –0.1 10383.09 0.0
YEAR MONTH BCI %CHG CCI %CHG
2013 Apr 6031.02 0.0 10373.34 0.0
2013 Mar 6025.77 0.0 10368.09 0.0
2013 Feb 6026.77 1.3 10369.09 1.6
2013 Jan 6018.52 1.1 10360.84 1.5
2012 Dec 6012.77 1.1 10355.09 1.5
2012 Nov 6024.02 1.3 10366.34 1.6
2012 Oct 6025.02 1.4 10367.34 1.7
2012 Sep 6022.02 1.4 10364.34 1.7
2012 Aug 6024.21 1.5 10366.54 1.7
2012 Jul 6039.21 2.0 10381.54 2.0
2012 Jun 6043.21 2.2 10385.54 2.2
2012 May 6043.71 2.3 10386.04 2.2
2012 May 6043.71 2.3 10386.04 2.2
2012 Apr 6028.96 2.1 10371.29 2.1
2012 Mar 6027.21 2.2 10369.54 2.2
2012 Feb 5952.27 1.0 10207.79 0.6
2012 Feb 5952.27 1.0 10207.79 0.6
2012 Jan 5952.27 1.6 10207.79 0.9
2011 Dec 5949.27 1.4 10204.79 0.8
2011 Nov 5948.77 1.4 10204.29 0.8
2011 Oct 5943.77 1.4 10199.29 0.8
2011 Sep 5937.27 6.4 10192.79 3.1
2011 Aug 5936.02 6.0 10191.54 2.8
2011 Jul 5923.27 5.8 10178.79 2.7
2011 Jun 5911.77 5.7 10167.29 2.7
2011 May 5906.02 5.9 10161.54 2.8
2011 Apr 5905.02 7.9 10160.54 4.4
2011 Mar 5895.52 7.8 10151.04 4.4
2011 Feb 5892.52 7.9 10148.04 4.4
2011 Jan 5860.77 7.3 10116.29 4.1
2010 Dec 5864.77 7.3 10120.29 4.1
2010 Nov 5868.02 7.5 10123.54 4.2
2010 Oct 5859.52 7.3 10115.04 4.1
YEAR MONTH BCI %CHG CCI %CHG
2010 Sep 5579.61 2.1 9888.54 1.7
2010 Aug 5600.74 2.5 9909.67 1.9
2010 Jul 5600.24 2.5 9909.17 1.9
2010 Jun 5593.74 2.1 9902.67 1.7
2010 May 5576.99 1.6 9885.92 1.4
2010 Apr 5471.56 -0.5 9730.17 -0.3
2010 Mar 5469.56 -0.5 9728.17 -0.3
2010 Feb 5463.56 -0.6 9722.17 -0.3
2010 Jan 5461.81 -0.9 9720.42 -0.5
2009 Dec 5463.56 -1.1 9722.17 -0.6
2009 Nov 5460.81 -2.1 9719.42 -1.2
2009 Oct 5460.56 -2.4 9719.17 -1.4
2009 Sep 5465.31 1.7 9723.92 4.1
2009 Aug 5466.06 2.7 9724.67 4.7
2009 Jul 5464.31 2.8 9722.92 4.7
2009 Jun 5477.06 4.4 9735.67 5.6
2009 May 5489.81 5.5 9748.42 6.3
2009 Apr 5497.31 6.1 9755.92 6.6
2009 Mar 5499.06 6.2 9757.67 6.6
2009 Feb 5496.56 6.5 9755.17 6.8
2009 Jan 5510.81 6.8 9769.42 7
2008 Dec 5523.06 7.1 9781.67 7.1
2008 Nov 5576.06 8.1 9834.67 7.7
2008 Oct 5594.81 9.8 9853.42 8.5
2008 Sep 5372.35 5.4 9344.67 2.9
2008 Aug 5320.6 6.7 9292.92 2.4
2008 Jul 5313.85 6.6 9286.17 2.4
2008 Jun 5244.1 5.3 9216.42 1.7
2008 May 5202.1 3.4 9174.42 0.6
2008 Apr 5182.85 3.3 9155.17 0.6
2008 Mar 5177.85 3.2 9150.17 0.5
2008 Feb 5161.24 2.9 9133.56 0.4
2008 Jan 5161.24 2.9 9133.56 0.4
YEAR MONTH BCI %CHG CCI %CHG
2007 Dec 5159.49 2.7 9131.81 0.3
2007 Nov 5156.99 2.3 9129.31 0.1
2007 Oct 5096.9 1.6 9079.42 -0.2
2007 Sep 5095.9 5.8 9078.42 7.2
2007 Aug 4988.64 3.8 9071.91 7.3
2007 Jul 4986.64 3.8 9069.91 7.2
2007 Jun 4980.14 4 9063.41 7.4
2007 May 5033.45 5 9116.72 8
2007 Apr 5019.45 4.7 9102.72 7.8
2007 Mar 5019.41 4.7 9102.68 7.8
2007 Feb 5016.91 4.5 9100.18 7.7
2007 Jan 5017.41 4.2 9100.68 7.5
2006 Dec 5025.39 4.5 9108.66 7.6
2006 Nov 5040.37 5.4 9123.64 8.2
2006 Oct 5015.62 5.5 9098.89 8.3
2006 Sep 4815.14 1.8 8466.48 1
2006 Aug 4812.89 5.7 8464.23 2.5
2006 Jul 4805.89 5.3 8457.23 2.3
2006 Jun 4789.39 4.7 8440.73 1.9
2006 May 4794.36 5.3 8445.69 2.2
2006 Apr 4796.11 5.3 8447.44 2.3
2006 Mar 4793.11 6 8444.44 2.6
2006 Feb 4799.11 6.1 8450.44 2.7
2006 Jan 4817.11 6.5 8468.45 2.9
2005 Dec 4811.11 6.4 8462.45 2.8
2005 Nov 4783.86 6.3 8435.2 2.8
2005 Oct 4752.26 5.9 8403.59 2.6
2005 Sep 4731.12 5.4 8382.45 2.3
2005 Aug 4552.32 4.7 8259.2 1.2
2005 Jul 4564.32 5.3 8271.2 1.5
2005 Jun 4575.43 5.6 8282.31 1.7
2005 May 4553.53 6 8260.41 1.9
2005 Apr 4553.51 6.7 8260.39 2.3
The latest news and information
YEAR MONTH BCI %CHG CCI %CHG
2005 Mar 4520.24 7 8227.12 2.4
2005 Feb 4522.24 8.2 8229.12 5.4
2005 Jan 4522.74 10 8229.62 5.7
2004 Dec 4521.51 9.9 8228.39 5.6
2003 Dec 4113.11 0.5 7788.8 1.9
2002 Dec 4093.21 1.7 7644.46 3.3
2001 Dec 4025.65 -0.5 7399.07 -0.7
2000 Dec 4044.2 3.7 7447.99 9.3
1999 Dec 3898.57 -0.7 6816.7 -0.4
1998 Dec 3927.46 3.1 6845.59 1.7
1997 Dec 3809.11 4.8 6731.08 1.5
1996 Dec 3634.25 2 6629.61 1.1
1995 Dec 3561.6 1.2 6558.16 0.4
1994 Dec 3519.17 2.7 6530.35 0.8
1993 Dec 3428.04 3.9 6477.95 2.9
1992 Dec 3298.09 3.2 6294.84 1.2
1991 Dec 3270.9 0.8 6222.06 2.8
1990 Dec 3245.04 4 6055.61 2.1
1989 Dec 3119.95 1.4 5932.57 3.5
1988 Dec 3076.27 1.1 5734.48 0
1987 Dec 3044.27 2.8 5732.37 4.1
1986 Dec 2961.47 5 5508.43 9
1985 Dec 2819.5 2.3 5055.04 0.1
1984 Dec 2756.35 -2.5 5049.13 -1.4
1983 Dec 2826.13 0.9 5122.74 2.6
1982 Dec 2799.96 9.4 4993.3 8.7
1981 Dec 2558.49 6.8 4592.45 5
1980 Dec 2395.21 10.2 4371.96 14.9
1979 Dec 2172.96 12 3806.14 11.5
1978 Dec 1940.78 9.7 3412.2 8.3
#1 Source for Construction News, Data, Rankings,Analysis, and Commentary

JOIN ENR UNLIMITED
Copyright ©2023. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

HAYWARD CITY COUNCIL
RESOLUTION NO. 17- 167
Introduced by Council Member Mendall
RESOLUTION RESCINDING RESOLUTION 16- 189 AND ESTABLISHING AFFORDABLE

HOUSING IN - LIEU FEES
WHEREAS, to assure that future housing development in the City of Hayward ( the City") contributes to the production of residential units in the City that are affordable to very low, low- and moderate -income households and mitigates its impact on the need for affordable housing in the City, the City Council has considered and introduced on this same date an ordinance to amend the Affordable Housing Ordinance ( Chapter 10, Article 17 of the City' s Municipal Code) ( the " Affordable Housing Ordinance"); and WHEREAS, the Affordable Housing Ordinance authorizes the imposition of Affordable Housing In -Lieu Fees on for -sale and rental residential developments to provide funds equal to the cost of providing affordable housing on-site and to mitigate the impact of market -rate housing development on the need for affordable housing, where applicants elect to pay Affordable Housing In -Lieu Fees rather than provide affordable units on- or off- site; and
WHEREAS, to ensure that the Affordable Housing In -Lieu Fees adopted by this Resolution do not exceed the cost of providing affordable housing on-site or the actual affordable housing impacts attributable to the development projects on which the fee is imposed, the City Council has received and considered a report from Keyser Marston Associates dated October 31, 2017 and entitled " Summary, Context Materials, and Recommendations: City of Hayward Affordable Housing Ordinance Update," which includes, among other information, an affordability gap analysis, a residential nexus analysis, a financial feasibility analysis, and an on-site compliance cost analysis ( the " KMA Study"); and
WHEREAS, the KMA Study demonstrates that, to fully mitigate the burdens created by residential development on the need for extremely low, very low, low, median, and moderate -income housing, an affordable housing impact fee of $28.90 to $44.90 per square foot of new market rate residential development would be needed, and that the cost of on- site compliance is equivalent to approximately $ 18 to $ 22 per square foot of new market rate residential development; and
WHEREAS, the City Council now desires to rescind the Affordable Housing Impact Fees previously adopted under Resolution 16- 189 and to adopt Affordable Housing In -Lieu Fees for residential developments as authorized by the Affordable Housing Ordinance; and WHEREAS, the KMA Study found that the Affordable Housing In -Lieu Fees imposed by this Resolution are economically feasible and will not pose a constraint on the construction of housing in the City; and
WHEREAS, notice of the hearing on the proposed fee was published twice in the manner set forth in Government Code Section 6062a as required by Government Code Sections 66004 and 66018; and
WHEREAS, the City Council has reviewed the information contained in this Resolution and the accompanying staff report and attachments thereto at a meeting held on November 7, 2017.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HAYWARD THAT:

Section 1. The City Council finds as follows:

A. The foregoing recitals are true and correct and incorporated into this Resolution by this reference.

B. The purpose of the Affordable Housing In -Lieu Fee is to provide funds to the City to develop and construct affordable housing as would otherwise be provided on-site and to mitigate the burdens created by new residential and nonresidential development projects on the need for extremely low, very low, low, and moderate -income housing. An applicant for a residential development project may elect to provide affordable units on- site, to pay the Affordable Housing In -Lieu Fee, to provide affordable units off- site, or to provide affordable housing through other means.

C. In compliance with the Affordable Housing Ordinance, all affordable housing impact fees collected shall be deposited into the City' s Affordable Housing Trust Fund to be used solely to increase and preserve the supply of housing affordable to households of extremely low, very low, low, median, and moderate incomes ( including reasonable administrative costs).

D. There is a need in the City for housing affordable to households of extremely low, very low, low, and moderate incomes.

E. The KMA Study sets forth cost estimates that are reasonable for constructing affordable housing, and the fees expected to be generated by new development will not exceed these costs.

F. Based on the KMA Study, the proposed Affordable Housing In -Lieu Feesare economically feasible and will not pose a constraint on housing production.

G. Adoption of this Resolution is exempt from the California Environmental Quality Act because the adoption of this Resolution is not a project, in that it is a government funding mechanism which does not involve any commitment to any specific project. ( CEQA Guidelines Section 15378( b) ( 4).)
Section 2. The City Council hereby rescinds and removes the Affordable Housing Impact Fee established by Resolution No. 16-189.

Page 2 ends

Section 3. The City Council hereby adopts the following Affordable Housing In -Lieu Fees:

1. Residential Development Projects - Ten Units or More a. High - Density Condominiums
35 units per acre or more)
b. All Other Dwelling Unit Types
Notes:

15. 00/ Square Foot of Habitable Space*

18. 18/ Square Foot of Habitable Space*
Affordable housing in -lieu fees shall be paid either prior to issuance of a building permit or prior to approval of a final inspection or issuance of an occupancy permit. Fees paid at occupancy shall be increased by 10 percent to $ 16.50/ sq. ft. of habitable space for high density condominiums and to 20/ sq. ft. of habitable space for all other dwelling unit types.

Habitable Space" means floor area within a dwelling unit designed, used, or intended to be used exclusively for living and sleeping purposes and exclusive of vent shafts, eaves, overhangs, atriums, covered entries and courts and any portion of a structure above ground used for parking, parking aisles, loading areas, or accessory uses.

2. Residential Development Projects - Two to Nine Units Projects of two to nine units shall pay the following percentage of the fee calculated pursuant to Section 1 above:

Number of Units in Project
2 3
4 5
6 7
8 9
Percentage of Calculated Fee
50%
67%
75%
80%
83%
86%
88%
89%

3. Fractional Units. If an applicant provides on- site Affordable Units under Chapter 10, Article 17 of the Hayward Municipal Code and elects to pay Affordable Housing In -Lieu Fees for a fractional unit, the fractional in -lieu fee payment shall be calculated as follows:

Fractional Unit/ Total Affordable Unit Requirement x Per Square Foot Fee x Total Habitable Square Footage in the Project
Example: 42 -unit townhouse project totaling 85,000 habitable sq. ft. has on-site requirement of 10%, or 4.2 units. Developer elects to provide 4 affordable units and pay an in -lieu fee for the fractional unit. The payment is calculated as follows:

Page 3 ends

0.2/ 4.2 x $18.18 x 85,000 sq. ft. = $ 73, 586

4. Applications for Residential Development Projects of Two or More Units Deemed Complete as of December 20, 2017
a. Projects receiving all discretionary approvals by February 1, 2018:

Affordable Housing Impact Fees in effect on December 20, 2017. b. Projects not receiving all discretionary approvals by February 1, 2018, provided that all discretionary approvals and building permit( s) are obtained within two ( 2) years of December 20, 2017: 50% of the Affordable Housing In - Lieu Fee calculated under either Section 1 or Section 2 above, as applicable depending on the size of the project.

Section 4. The City Council may review and amend the Affordable Housing In -Lieu Fee from time to time. Beginning January 1, 2019, for any annual period during which the City Council does not review the affordable housing impact fee, fee amounts shall be adjusted once by the City Manager or designee based on the percentage change in the Engineering New Record( ENR) Construction Cost Index applicable to the San Francisco Area.

Section S. An Affordable Housing In -Lieu Fee as shown in Section 3 shall be paid by all developments subject to the fee.

Section 6. This Resolution shall go into full force and effect on Februarry 1, 2018.

Section 7. Any judicial action or proceeding to attack, review, set aside, void or annul this Resolution shall be brought within the 90 -day time period as established by Code of Civil Procedure Section 1094. 6.

Page 4 ends

IN COUNCIL, HAYWARD, CALIFORNIA November 7 2017
ADOPTED BY THE FOLLOWING VOTE:

AYES: COUNCIL MEMBERS: Zermeno, MArquez, Mendall, Peixoto, Lamnin, Salinas MAYOR: Halliday
NOES: COUNCIL MEMBERS: None
ABSTAIN: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
ATTEST: C
PROVED AS 0 FOR
City Attorney of the City of Hayward
City Clerk of the City of Hayward

Page 5 ends

City of Hayward
Comprehensive User Fee Study Report
October 12, 2016

Corporate Office:  Office Locations:
27368 Via Industria  Anaheim, CA   New York, NY
Suite 200  Oakland, CA  Orlando, FL
Temecula, CA 92590  Sacramento, CA
Tel:  (951) 587‐3500
Tel:  (800) 755‐6864
Fax:  (951) 587‐3510
www.willdan.com

City of Hayward  Comprehensive User Fee Study  ii
TABLE  OF  CONTENTS
Executive Summary ............................................................................................................................. 1 User Fee Background ........................................................................................................................... 2 Background ........................................................................................................................................................... 2 California User Fee History ................................................................................................................................... 2 Additional Policy Considerations .......................................................................................................................... 3 Study Objective...................................................................................................................... .............. 4 Scope of the Study ................................................................................................................................................ 5 Aim of the Report ................................................................................................................................................. 5 Project Approach and Methodology ..................................................................................................... 6 Conceptual Approach ........................................................................................................................................... 6 Fully Burdened Hourly Rates ................................................................................................................................ 6 Summary Steps of the Study ................................................................................................................................. 7 Allowable Costs ..................................................................................................................................................... 7 Methodology ........................................................................................................................................................ 8 Quality Control / Quality Assurance ..................................................................................................................... 8 Reasons for cost increases / decreases over current fees .................................................................................... 9 City Staff Contributions ......................................................................................................................................... 9 Hayward User Fees ............................................................................................................................ 10 Cost Recovery ..................................................................................................................................................... 10 Subsidization ....................................................................................................................................................... 10 Impact on Demand (Elasticity) ............................................................................................................................ 11 Summary ............................................................................................................................................................. 11 City Clerk and City Wide ..................................................................................................................... 12 Finance .............................................................................................................................................. 12 City Manager ..................................................................................................................................... 13 Development Services ....................................................................................................................... 13 Police ................................................................................................................................................. 15 Fire .................................................................................................................................................... 15 Information Technology ..................................................................................................................... 16

City of Hayward  Comprehensive User Fee Study  iii
Library and Community Services department ..................................................................................... 16 Maintenance Services Department .................................................................................................... 16 Public Works ...................................................................................................................................... 17 Utilities & Environmental Services ..................................................................................................... 18 Appendix A – Total Allowable Cost to be Recovered .......................................................................... 19 Appendix B – Fully Burdened Hourly Rates ......................................................................................... 20 Appendix C – Cost Recovery Analysis & Suggested Fee Levels ............................................................ 30

City of Hayward  Comprehensive User Fee Study  1
EXECUTIVE  SUMMARY
The City of Hayward (the City) engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which the City charges user fees.  Due to the complexity and the breadth of performing a comprehensive review of fees, Willdan employed a variety of fee methodologies to identify the full costs  of  individual  fee  and  program  activities.   This  report  and  the  appendices  herein  identifies  100%  full  cost recovery  for  City  services  and  the  recommended  level  of  recovery  as  determined  through  discussion  with departmental staff.

The reality of the local government fee environment is that significant increases to achieve 100% cost recovery can often not be feasible, desirable, or appropriate depending on policy direction ‐  particularly in a single year.   The recommended fees identified herein are either at or less than full cost recovery.

City of Hayward  Comprehensive User Fee Study  2
USER  FEE  BACKGROUND

BACKGROUND
As part of a general cost recovery strategy, local governments have adopted user fees to fund programs and services that provide limited or no direct benefit to the community as a whole.  As cities struggle to maintain levels of service and variability of demand, they have become increasingly aware of subsidies provided by the General Fund and have implemented cost‐recovery targets. To the extent that governments use general tax monies to provide individuals with private benefits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government  is  limiting  funds  that  may  be  available  to  provide  other  community‐wide  benefits.  In  effect,  the government is using community funds to pay for private benefit. Unlike most revenue sources, cities have more control over the level of user fees they charge to recover costs, or the subsidies they can institute.

Fees in California are required to conform to the statutory requirements of the California Constitution, Proposition 218,  and  the  California  Code  of  Regulations.   The  Code  also  requires  that  the  City  Council  adopt  fees  by  either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be approved by a popular vote of two‐thirds of those electors voting because the charge would be considered a tax and not a fee.

CALIFORNIA  USER  FEE  HISTORY
Before Proposition 13, California cities were less concerned with potential subsidies and recovering the cost of their services from individual fee payers.   In times of fiscal shortages, cities simply raised property taxes, which funded everything from police and recreation to development‐related services. However, this situation changed with the passage of Proposition 13 in 1978.

Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further  limited  the  imposition  of  taxes  for  certain  classes  of  fees.  As  a  result,  cities  were  required  to  secure  a supermajority  vote  in  order  to  enact  or  increase  taxes.  Since  the  public  continues  to  resist  efforts  to  raise  local government taxes, cities have little control and very few successful options for new revenues. Compounding this limitation,  the  State  of  California  took  a  series  of  actions  in  the  1990’s  and  2000’s  to  improve  the  State’s  fiscal situation—at   the  expense  of  local  governments.  Most  recently,  the  Educational  Revenue  Augmentation  Funds (“ERAF”)  take‐away  of  property  taxes  and  the  reduction  of  Vehicle  License  Fees  have  severely  reduced  local  tax revenues.

In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus requiring approval by two‐thirds vote of local voters.  These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities.   Proposition 26 contains seven categories of exceptions.   The vast majority of fees that cities would seek to adopt will most likely fall into one or more of these exemptions.

City of Hayward  Comprehensive User Fee Study  3
ADDITIONAL  POLICY  CONSIDERATIONS
In recent years, there has been a growing trend for municipalities to update their fee schedules to reflect the actual costs of certain public services primarily benefitting users. User Fees recover costs associated with the provision of specific services benefiting the user, thereby reducing the use of General Fund monies for such purposes.

In addition to collecting the direct cost of labor and materials associated with processing and administering user services, it is common for local governments to recover support costs.  Support costs are those costs relating to a local  government’s  central  service  departments  that  are  properly  allocable  to  the  local  government’s  operating departments. Central services support cost allocations were derived from the City’s Cost Allocation Plan.

As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it has the flexibility to remain current.  Therefore, it is recommended that the  City  include  an  inflationary  factor  in  the  resolution  adopting  the  fee  schedule  to  allow  the  City  Council,  by resolution, to annually increase or decrease the fees.

The City may employ many different inflationary factors.   The most commonly used inflator is some form of the Consumer Price Index (CPI) as it is widely well known and accepted.  A similar inflator is the implicit price deflator for GDP, which is much like the CPI except that while the CPI is based on the same “basket” of goods and services every year, the price deflators’ “basket” can change year to year.   Since the primary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an inflationary factor more directly to the personnel costs can be suitable if there is a clear method for obtaining said factor.  For example, if a departments’ personnel costs increase by 5% and account for 50% of that departments’ total budget, then the inflator to account for the personnel cost increase would be 2.5%.  Department budgets can be volatile from year to year, which could result in fee confusion for the community if there are constant unpredictable changes in the fees as a result of the previous calculation.   To mitigate this effect, a substitute inflator such as one or a combination of personnel COLA’s, Step increase levels, PERS, and/or healthcare cost increases are generally less volatile on a yearly basis, and can be applied Citywide to fees and services.

Each City should use an inflator that they believe works the best for their specific situation and needs. It is also recommended that the City perform this internal review annually with a comprehensive review of services and fees performed every three to five years, which would include adding or removing fees for any new or eliminated programs/services.

City of Hayward  Comprehensive User Fee Study  4
STUDY  OBJECTIVE
As the City of Hayward seeks to efficiently manage limited resources and adequately respond to increased service demands, it needs a variety of tools.  These tools provide assurance that the City has the best information and the best resources available to make sound decisions, fairly and legitimately set fees, maintain compliance with state law and local policies, and meet the needs of the City administration and its constituency. Given the limitations on raising  revenue  in  local  government,  the  City  recognizes  that  a  User  Fee  Study  is  a  very  cost‐effective  way  to understand the total cost of services and identify potential fee deficiencies. Essentially, a User Fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.

The total cost of each service included in this analysis is based on the full cost of providing City services, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs from central service support.

This study determines the full cost recovery fee for the City to provide each service; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.

The principle goal of the study was to help the City determine the full cost of the services that the City provides.  In addition, Willdan established a series of additional objectives including:
 Developing a rational basis for setting fees
 Identifying subsidy amount, if applicable, of each fee in the model  Enhancing fairness and equity
 Ensuring compliance with State law
 Developing an updatable and comprehensive list of fees  Maintaining accordance with City policies and goals
The study results will help the City better understand its true costs of providing services and may serve as a basis for making  informed  policy  decisions  regarding  the  most  appropriate  fees,  if  any,  to  collect  from  individuals  and organizations that require individualized services from the City.

City of Hayward  Comprehensive User Fee Study  5
SCOPE  OF  THE  STUDY
The scope of this study encompasses a review and calculation of the user fees charged by the following Hayward departments and fee groups:
 City Wide and City Clerk
 Finance
 City Manager
 Development
 Police
 Fire
 Information Technology
 Library and Community Services
 Maintenance
 Public Works
 Utilities and Environmental
The study involved the identification of existing and potential new fees, fee schedule restructuring, data collection and  analysis,  orientation  and  consultation,  quality  control,  communication  and  presentations,  and  calculation  of individual service costs (fees) or program cost recovery levels.

AIM  OF  THE  REPORT
The User Fee Study focused on the cost of City services, as City staff currently provides them at existing, known, or reasonably anticipated service and staff levels.  This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determine the recommended fee schedule.

The report is not intended to document all of the numerous discussions throughout the process, nor is it intended to provide influential dissertation on the qualities of the utilized tools, techniques, or other approaches.

City of Hayward  Comprehensive User Fee Study  6
PROJECT  APPROACH  AND  METHODOLOGY
CONCEPTUAL  APPROACH
The basic concept of a User Fee Study is to determine the “reasonable cost” of each service provided by the City for which it charges a user fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.

The  standard  fee  limitation  established  in  California  law  for  property‐related  (non‐discretionary)  fees  is  the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every component of the fee study process included a related review. The use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.

FULLY  BURDENED  HOURLY  RATES
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary  and  benefits,  but  also  any  costs  that  are  reasonably  ascribable  to  personnel.  The  cost  elements  that  are included in the calculation of fully burdened rates are:
 Salaries & benefits of personnel involved
 Operating costs applicable to fee operations
 Departmental support, supervision, and administration overhead  Internal Service Costs charged to each department
 Indirect City‐wide overhead costs calculated through the Cost Allocation Plan The FBHRs are then used in conjunction with time estimates, when appropriate, to calculate a fees' cost based on the personnel and the amount of their time that is involved in providing each service.

City of Hayward  Comprehensive User Fee Study  7
SUMMARY  STEPS  OF  THE  STUDY
The  methodology  to  evaluate  most  User  Fee  levels  is  straightforward  and  simple  in  concept.  The  following  list provides a summary of the study process steps:

ALLOWABLE  COSTS
This  report  identifies  three  types  of  costs  that,  when  combined,  constitute  the  fully  burdened  cost  of  a  service (Appendix A). Costs are defined as direct labor, including salary and benefits, departmental overhead costs, and the City’s central services overhead, where departmental and central service overhead costs constitute support costs.

These cost types are defined as follows:
 Direct Labor: The costs related to staff salaries for time spent directly on fee‐related services.  Departmental Overhead: A proportional
allocation of departmental overhead costs,
including operation costs such as supplies
and materials that are necessary for the
department to function.
 Central Services Overhead: These costs,
detailed in the City’s Cost Allocation Plan,
represent services provided by those
Central Services Departments whose
primary function is to support other City
departments.

Data Analysis
Department Interviews
Time Estimates
Labor Costs
Cost Allocation Plan
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City‐Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy

City of Hayward  Comprehensive User Fee Study  8

METHODOLOGY
The two methods of analysis for calculating fees used in this report are the:

Case Study Method: This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary dramatically for a service, or for special projects where the time and cost requirements are easy to identify at  the  project’s  outset.  Further,  the  method  is  effective  in  instances  when  a  staff  member  from  one department  assists  on  an  application,  service  or  permit  for  another  department on  an  as‐needed basis.

Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.

Programmatic Approach: The standard Case Study approach relies upon the detailed analysis of specific time estimates, salaries and benefits, expenditures, and overhead costs.  In many instances, the underlying
data are not available or vary widely, leaving a standard unit cost build‐up approach impractical. In addition, market factors and policy concerns (as opposed to actual costs) tend to influence fee levels more than other types  of  services.  With  these  general  constraints,  and  in  order  to  maximize  the  utility  of  this  analysis, Willdan employed a different methodology where appropriate.

Valuation Based Fees: This manner of collection is used when the valuation of the improvement can be used as a proxy for the amount of effort it would take for City staff to complete the service provided.

More specifically, this approach is commonly used for certain User Fees in the Building Division.

QUALITY  CONTROL  / QUALITY  ASSURANCE
All study components are interrelated, thus flawed data at any step in the process will cause the ultimate results to be inconsistent and unsound. The elements of our Quality Control process for User Fee calculations include:
 Involvement of knowledgeable City staff
 Clear instructions and guidance to City staff
 Reasonableness tests and validation
 Normalcy/expectation ranges
 Confirmation of staff hours
 FTE balancing
 Internal and external reviews
 Cross‐checking

City of Hayward  Comprehensive User Fee Study  9
REASONS  FOR  COST  INCREASES  / DECREASES  OVER  CURRENT  FEES Within the fee tables in Appendix C, the differences identified between the full costs calculated through the study and the fee levels currently in effect.   The reasons for differences between the two can arise from a number of possible factors including:
 Previous fee levels may have been set at levels less than full cost intentionally, based on policy decisions  Staffing levels and the positions that complete fee and service activity may vary from when the previous costs were calculated
 Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
 Costs that this study has identified as part of the full cost of services may not have been accounted for in a previous study
o Departmental overhead and administration costs
o Indirect overhead from the Cost Allocation Plan
 Changes in processes and procedures within a department, or the city as a whole

CITY  STAFF  CONTRIBUTIONS
As  part  of  the  study  process,  Willdan  received  tremendous  support  and  cooperation  from  City  staff,  which contributed and reviewed a variety of components to the study, including:
 Budget and other cost data
 Staffing structures
 Fee and service structures, organization, and descriptions  Direct and indirect work hours (billable/non‐billable)  Time estimates to complete work tasks
 Frequency and current fee levels
 Review of draft results and other documentation
A User Fee Study requires significant involvement of the managers and line staff from the departments—on  top of their existing workloads and competing priorities. The contributions from City staff were critical to this study. We would like to express our appreciation to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation.

City of Hayward  Comprehensive User Fee Study  10
HAYWARD  USER  FEES
COST  RECOVERY
The cost recovery models, by department/division fee type, are presented in detail in Appendix C. Full cost recovery is determined by summing the estimated amount of time each position (in increments of minutes or hours) spends to render a service. Time estimates for each service rendered were predominately determined by Willdan and City Staff through a time and materials survey conducted for each department/division fee included in the study. The resulting  cost  recovery  amount  represents  the  total  cost  of  providing  each  service.  The  City’s  current  fee  being charged for each service, if applicable, is provided in this section, as well, for reference.

It is important to note that the time and materials survey used to determine the amount of time each employee spends assisting in the provision of the services listed on the fee schedule is essential in identifying the total cost of providing  each  service.  Specifically,  in  providing  services,  a  number  of  employees  are  often  involved  in  various aspects of the process, spending anywhere from a few minutes to several hours on the service.

The principle goal of this study was to identify the cost of City services, in order to provide information to help the City make informed decisions regarding the actual fee levels and charges. The responsibility to determine the final fee levels is a complicated task. City staff must consider many issues in formulating recommendations, and the City Council must consider those same issues and more in making the final decisions.

City staff assumes the responsibility to develop specific fee level recommendations to present to the City Council.

Unfortunately, there are no hard and fast rules to guide the City, since many of the considerations are based on the unique characteristics of the City of Hayward, and administrative and political discretion. However, in setting the level of full cost recovery for each fee, one should consider whether the service solely benefits one end user or the general community.

SUBSIDIZATION
Recalling the definition of a user fee helps guide decisions regarding subsidization.   The general standard is that individuals (or groups) whom receive a wholly private benefit should pay 100% of the full cost of the services. In contrast,  services  that  are  simply  public  benefit  should  be  funded  entirely  by  the  general  fund’s  tax  dollars.

Unfortunately, for the decision makers, a large number of services fall into the range between these two extremes (i.e., Library and Recreation services).  The graphic on the following page illustrates the potential decision basis.

Further  complicating  the  decision,  opponents  of  fees  often  assert  that  the  activities  subject  to  the  fees  provide economic, cultural, “quality of life,” or other community benefits that exceed the costs to the City. It is recommended the City consider such factors during its deliberations regarding appropriate fee levels.

City of Hayward  Comprehensive User Fee Study  11
Of  course,  subsidization  can  be  an
effective  public  policy  tool,  since  it  can
be  used  to  reduce  fees  to  encourage
certain  activities  (such  as  sports
programs  and  educational  classes)  or
allow some people to be able to afford to
receive  services  they  otherwise  could
not at the full cost. In addition, subsidies
can  be  an  appropriate  and  justifiable
action,  such  as  to  allow  citizens  to
rightfully  access  services,  (such  as
appeals of discretionary actions) without
burdensome costs.

Despite the intent, it is important for the
City  and  public  to  understand  that
subsidies  must  be  covered  by  another
revenue  source,  such  as  the  General  Fund.  Therefore,  the  general  taxpayer  will  potentially  help  to  fund  private benefits, and/or other City services will not receive funds that are otherwise directed to cover subsidies.

IMPACT  ON  DEMAND  (ELASTICITY)
Economic  principles  of  elasticity  suggest  that  increased  costs  for  services  (higher  fees)  will  eventually curtail the demand for the services; whereas lower fees may spark an incentive to utilize the services and encourage certain actions.  Either of these conditions may be a desirable effect to the City. However, the level of the fees that would cause demand changes is largely unknown. The Cost of Service Study did not attempt to evaluate the economic or behavioral impacts of higher or lower fees; nevertheless, the City should consider the potential impacts of these issues when deciding on fee levels.

SUMMARY
If the City’s overriding goal of this study were to maximize revenues from user fees, Willdan would recommend setting user fees at 100% of the full cost identified in this study.  However, we understand that revenue enhancement is not the only goal of a cost of service study, and sometimes full‐cost recovery is not needed, desired, or appropriate.

Other City and departmental goals, City Council priorities, policy initiatives, past experience, implementation issues, and other internal and external factors may influence staff recommendations and City Council decisions. In this case, the  proper  identification  of  additional  services  (new  or  existing  services)  and  creation  of  a  consistent  and comprehensive  fee  schedule  was  the  primary  objective  of  this  study.  City  staff  has  reviewed  the  full  costs  and identified the “recommended fee levels” for consideration by City Council. The attached appendices exhibit these unit fees individually.

The preceding sections provide background for each department or division and the results of this study’s analysis of their fees.  For the full list of each fee’s analysis, refer to Appendix C of this report.

100%
0%
100%
Private
Benefit
Some
Public
Benefit
Some
Private
Benefit
100%
Public
Benefit
User
Fees
General
Fund
(Subsidy)
General
Fund
(Subsidy) General
Fund
(Subsidy)
User
Fees
User
Fees

City of Hayward  Comprehensive User Fee Study  12
CITY  CLERK  AND  CITY  WIDE
The mission of the Office of the City Clerk is: to ensure the security and accessibility of all official City records; to serve  as  the  information  and  records  manager  of  all  legislative  proceedings;  to  conduct  all  aspects  of  municipal elections;  and  to  serve  as  a  support  office  to  the  City  Council,  City  staff,  City  Boards  and  Commissions,  and  the residents of Hayward.

ANALYSIS
Willdan  individually  reviewed  the  services  provided  by  City  Clerk  and  other  City  wide  services.   The  review  also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  analysis  of  services  in  City  Clerk  and  the  City  wide  fees  relied  primarily  upon  a  standard  unit  cost  build‐up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro‐rata share of departmental costs, including indirect costs for City Central Services.  Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service.   It is recommended that the City set fees at or near 100% cost recovery for most fees.   As a result, while there will be increases to some fees and decreases to a few others as detailed in Appendix C, the average fee change is 0% for City Clerk and 5% for City wide fees.

FINANCE
The Finance Department provides fiscal oversight and management of the City’s financial operations and various related  organizations.  This  includes  financial  reporting,  fiscal  analysis,  budgeting,  all  accounting  functions  in  the management of the city’s finances, oversight of an external financial audit for compliance with City laws and policies, debt  management,  investment  of  the  City’s  cash,  grants  administration,  provision  of  purchasing  services  and ensuring compliance with all purchasing laws and policies, service to all the City’s sales and use tax payers, billing and collections of the City’s utility and tax bills.

ANALYSIS
Willdan individually reviewed the services provided by Finance.  The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  services  in  Finance  are  predominately  related  to  business  permit  and  parking  activity.   The  analysis  relied primarily upon a standard unit cost build‐up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro‐rata share of departmental costs, including indirect  costs  for  City  Central  Services.   Willdan  then  compared  the  calculated  full  cost  against  the  current  fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service.  It is recommended that the City set Finance services at 100% cost recovery for most fees.  As a result, while there will be increases to some fees and decreases to a few others as detailed in Appendix C, the average fee change is a decrease of 11%, not accounting for new services.

City of Hayward  Comprehensive User Fee Study  13
CITY  MANAGER
The  City  Manager’s  Office  maintains  operational  responsibility  for  economic  development,  neighborhood partnerships,  community preservation,  and  communications  and  media  relations.  Management  of the  Successor Agency to the Hayward Redevelopment Agency also falls under the purview of this department.

ANALYSIS
Willdan  individually  reviewed  the  services  and  programs  associated  with  the  City  Manager’s  Department.   The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  services  covered  under the  City  Manager  are  primary  for  economic  development  and film  permit  purposes.

There are a couple fees that were determined based on the flat cost of providing service, and are recommended to be set at 100% cost recovery.  The film permit fees were not adjusted as part of this study and are stated at their current levels.  As a result, there are no suggested changes to the fees for City Manager.

DEVELOPMENT  SERVICES
The Development Services Department is comprised of the Administration, Building, Code Enforcement and Planning Divisions.  A  primary  task  of  the  department  is  to  assist  Council,  in  planning  for  and  regulating  development  in Hayward, in order to assure the economic, aesthetic, and environmental health of the community and a high quality of life for its residents. The Department seeks to protect the health and safety of the community through building inspection  and  enforcement  of  local,  state,  and  federal  standards;  and  to  work  with  applicants  and  residents  to achieve development that will add value to the City of Hayward within the goals and policies established by Council.

BUILDING  ANALYSIS
Willdan individually reviewed the services and programs associated with Building.  The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  Building  division  underwent  a  very  intensive  internal  analysis  to  determine  the  time  and  materials  cost  of providing service in order to calculate the full cost of providing services.  The fee schedule listed in Appendix C is the result of that analysis that utilized the cost build up approach whereby the time of staff involved in each service is determined, and through the use of fully burdened hourly rates, the full cost was determined.   The fees listed in Appendix C are at or near 100% cost recovery for most fees.

PLANNING  ANALYSIS
Willdan individually reviewed the services and programs associated with Planning.  The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  services  provided  by  Planning  are  predominantly  provided  through  the  use  of  deposit  systems  where  a reasonable deposit is collected upon inception of the service request and as staff expends effort on the project, the deposit  is  drawn  down  using  the  fully  burdened  hourly  rates  of  staff.   If  additional  cost  is,  or  anticipated  to  be, expended  above  the  deposit  amount  the  City  initially  collected,  the  requestor  will  be  billed  for  the  additional amount.   For all flat fees a standard unit cost build‐up approach, whereby we determined the reasonable cost of

City of Hayward  Comprehensive User Fee Study  14
each fee occurrence using staff time to recover the direct cost of staff and pro‐rata share of departmental costs, including indirect costs for City Central Services.  Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service.  It is recommended that the City set Planning services at 100% cost recovery for most fees.  As a result, while there will be increases to some fees and decreases to others as detailed in Appendix C, the average fee change is an increase of 57%.

CODE  ENFORCEMENT  ANALYSIS
Willdan  individually  reviewed  the  services  and  programs  associated  with  Code  Enforcement.   The  review  also consisted of an evaluation of existing services in an effort to update the fee schedule.

The two programs analyzed as part of this study was the Community Preservation Program and the Rental Housing & Hotel Inspection Fee Programs.  The analysis of the Community Preservation Program a standard unit cost build‐ up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro‐rata share of departmental costs, including indirect costs for City Central Services.  Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service.  The analysis has shown that the fees are under recovering the cost of providing service.  It is recommended that the City set these fees at 100% cost recovery for all fees except for Abatement and Lien Processing.

The Rental Housing & Hotel Inspection Fee Program involved the use of both a unit cost calculation for inspections above the initial inspection and first progress check, and a program cost analysis that includes the cost of maintaining the program and the initial inspection that is anticipated to be performed for each parcel every 5 years. This program cost is recovered through the annual fee for the program.  Where previously there was an additional inspection fee per hotel and motel room, to simplify the structure of the fee schedule and to account for a relatively constant average amount of time spent on an inspection, the fees were changed to be assessed on a per parcel basis instead.

As a result of the analysis it was determined that the fees are currently under covering the cost of maintaining the program as a whole, and that this difference will only grow as more rentals are opened in the City.   Due to the removal of a per room or per unit charge for follow up inspections it was determined that the inspection fees were under recovering for instances where less than 4 units or rooms were inspected, and over recovering for 4 or greater units or rooms.   Staff recommends that the fees be adjusted to the suggested levels as listed in Appendix C. The revenue effect of these changes are estimated to be an overall increase to the entire program.  The variable factors that  make  a  more  accurate  estimate  difficult  are  knowing  the  elasticity  effect  of  increased  penalties  on  the occurrence level of re‐inspections, and it is unknown what the precise revenue affect the change to remove the per rental unit charge from the re‐inspection fees will be.

Both programs also have penalty amounts that will apply for avoidable conditions, and those can be set at the City’s discretion.  The recommended penalty amounts are also detailed in Appendix C.

City of Hayward  Comprehensive User Fee Study  15
POLICE
The  members  of  the  Hayward  Police  Department  are  committed  to  enhancing  the  quality  of  life  in  the  city  by maintaining partnerships with our diverse community, together creating safe and cohesive neighborhoods. They safeguard the lives and property of the people we serve, and to reduce the incidence and fear of crime. Animal Control services are included under Police in this analysis.

ANALYSIS
Willdan individually reviewed the services and programs associated with the Police Department.   The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  analysis  of  Police  and  Animal  Control  services  relied  primarily  upon  a  standard  unit  cost  build‐up  approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff  and  pro‐rata  share  of  departmental  costs,  including  indirect  costs  for  City  Central  Services.   Willdan  then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the costs associated with the requested service.   This analysis has shown that the costs associated with Police and Animal Control services are greater than the amounts charged for most fees. It is recommended that the City set Police services at or near 100% cost recovery for most fees.  There are additional services included in the fee schedule that are set based on factors outside the control of the Department such as State codes and previously established resolutions.   Those fees should remain at their designated levels.   All penalties are recommended to remain at their current levels as well. As a result, while there will be increases to some fees and decreases to others as detailed in Appendix C, the average fee change is an increase of 34%.

FIRE
The mission of the Hayward Fire Department is to protect lives and property by providing superior fire suppression and emergency medical services (EMS), supported by prevention through responsible and innovative regulatory and educational programs.

ANALYSIS
Willdan  individually  reviewed  the  services  and  programs  associated  with  the  Fire  Department.   The  review  also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Fire services relied primarily upon a standard unit cost build‐up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro‐rata share of departmental costs, including indirect costs for City Central Services.  Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the costs associated with the requested service.  This analysis has shown that the costs associated with Fire services are generally greater than the amounts charged for a majority of fees. It is recommended that the City set Fire services at 100% cost recovery for most fees.  As a result, while there will be increases to some fees and decreases to others as detailed in Appendix C, the average fee change is an increase of 4% for fire prevention services and 13% for hazardous materials services.

City of Hayward  Comprehensive User Fee Study  16
INFORMATION  TECHNOLOGY
The  Information  Technology  Department  prioritizes,  coordinates,  and  implements  technology  initiatives  that  are consistent with the strategic goals and resources of the City. This includes identifying new approaches and emerging technologies that can respond to the changing methods of delivering City services to mobile constituents and staff, and to the unique operational needs of City departments.

ANALYSIS
Willdan individually reviewed the services and programs associated with the Information Technology Department.

The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  analysis  of  Information  Technology  services  relied  primarily  upon  a  standard  unit  cost  build‐up  approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff  and  pro‐rata  share  of  departmental  costs,  including  indirect  costs  for  City  Central  Services.   Willdan  then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the costs associated with the requested service.   This analysis has shown that the costs associated with Information Technology services are greater than the amounts charged for fees. It is recommended that the City set Information Technology services at 100% cost recovery for most fees.  As a result, there would be increases to fees as detailed in Appendix C, the average fee change is an increase of 31%.

LIBRARY  AND  COMMUNITY  SERVICES  DEPARTMENT
The mission of the Library and Community Services Department is to deliver equal opportunity in education to every Hayward resident, and to preserve and enhance the quality of life for all members of the Hayward community.

ANALYSIS
Willdan  individually  reviewed  the  services  and  programs  associated  with  the  Library  and  Community  Services Department.  The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  analysis  of  Library  and  Community  services  relied  primarily  upon  a  standard  unit  cost  build‐up  approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff  and  pro‐rata  share  of  departmental  costs,  including  indirect  costs  for  City  Central  Services.   Willdan  then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the costs associated with the requested service.   Staff proposes that fees remain at their current levels.

MAINTENANCE  SERVICES  DEPARTMENT
The Maintenance Services Department provides front line services that are visible to residents and contribute to a safe, clean, and green community, consistent with Council’s priorities. The Department is responsible for a wide range  of  functions  including:  maintaining  the  City's  streets;  graffiti  removal  on  public  property;  illegal  dumping

City of Hayward  Comprehensive User Fee Study  17
removal  in  the  public  right‐of‐way;  major  road  corridor  maintenance  and  improvement;  street  sweeping  and cleaning  of  storm  drains;  emergency  response  to  street,  landscape,  or  hazardous  material  spill  emergencies; maintenance of public landscaping; maintenance and operation of City buildings and structures; and acquisition, maintenance, and repair of City vehicles and equipment.

ANALYSIS
Willdan individually reviewed the services and programs associated with the Maintenance Services Department.  The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  analysis  of  Maintenance  services  relied  primarily  upon  a  standard  unit  cost  build‐up  approach,  whereby  we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro‐ rata  share  of  departmental  costs,  including  indirect  costs  for  City  Central  Services.   Willdan  then  compared  the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the personnel costs associated with the requested service.  This analysis has shown that the costs associated with Maintenance  services  are  generally  greater  than  the  amounts  charged.  It  is  recommended  that  the  City  set Maintenance services at 100% cost recovery for most fees.  As a result, there would be increases to fees as detailed in Appendix C, the average fee change is an increase of 34%.

PUBLIC  WORKS
The  Public  Works‐Engineering  and  Transportation  Department  is  organized  into  six  divisions:  Administration, Design/Development Services, Construction Services, Transportation, Survey, and the Executive Airport Enterprise.

The Department is responsible for providing engineering and transportation support to City operating departments and divisions and for implementation of the City’s Capital Improvement Program. The Department is also charged with providing oversight to and support of daily Airport operations.

ANALYSIS
Willdan individually reviewed the services and programs associated with the Public Works Department.  The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The primary programs included in the study for Public Works is Airport and Engineering.   There are no proposed changes to the Airport fees.  The analysis of Engineering services relied primarily upon a standard unit cost build‐up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro‐rata share of departmental costs, including indirect costs for City Central Services.  Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the costs associated with the requested service.   This analysis has shown that the costs associated with Public Works services are generally greater than the amounts charged for a majority of fees. It is recommended that  the  City  set  most  Public  Works  services  at  or  near  100%  cost  recovery,  with  some  individual  exceptions  as identified in Appendix C.   As a result, there would be increases to fees as detailed in Appendix C, the average fee change is an increase of 10% for Engineering Services.

City of Hayward  Comprehensive User Fee Study  18
UTILITIES  & ENVIRONMENTAL  SERVICES
The Utilities & Environmental Department is responsible for management of the City’s Water Distribution System and  Wastewater  Collection  and  Treatment  Systems,  as  well  as  the  Solid  Waste  and  Recycling  Program,  and  the Stormwater Management System. In addition to operating and maintaining utilities facilities and equipment, this Department  is  responsible  for  compliance  with  all  applicable  local,  state,  and  federal  regulatory  requirements related to Department operations, and has responsibility for developing, implementing, coordinating, and managing sustainability programs and activities in the City, including implementation of strategies and programs contained in the City’s adopted Climate Action Plan.

ANALYSIS
Willdan individually reviewed the services and programs associated with the Utilities & Environmental Department.

The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The  analysis  of  Utilities  &  Environmental  services  relied  primarily  upon  a  standard  unit  cost  build‐up  approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff  and  pro‐rata  share  of  departmental  costs,  including  indirect  costs  for  City  Central  Services.   Willdan  then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee would recover the costs associated with the requested service.   This analysis has shown that the costs associated with Environmental & Utilities services are generally greater than the amounts charged for a majority of fees. It is recommended that the City set most Utilities & Environmental services at or near 100% cost recovery, with some individual exceptions as identified in Exhibit B.  In consultation with staff, it is recommended that the City adopt the fee increases as an incremental increase initially in the first year and a second increase in the second year to help mitigate impacts of getting to full cost for services.  As a result, the average fee increase is 17% for the first year and 45% for the second year. As a result, there will be an overall increase in revenues associated with fee activity if participation levels remain the same.

City of Hayward  Comprehensive User Fee Study  19
APPENDIX  A – TOTAL  ALLOWABLE  COST  TO  BE  RECOVERED

Below are the total allowable costs that may be recovered through User Fees; however, only a percentage of the total allowable cost is realized as staff not only works on services related to User Fees, but also works on an array of other City functions during the operational hours of the City.

City of Hayward ‐ User Fee
Overhead Rate Calculations
Department
Salary and
Benefits
Department
Operations and
Mai nte nance
Direct
Overhead %
Cap Allocation
%
CITY ATTORNEYS OFFICE 986,306                   96,600                         9.8% 0.0% CITY CLERK 456,164                   131,618                       28.9% 0.0% CITY MANAGERS OFFICE 2,902,841               1,274,922                   43.9% 0.0% FINANCE 3,020,742               805,255                       26.7% 0.0% FIRE 30,577,474             3,913,870                   12.8% 5.9% HUMAN RESOURCES 1,204,577               630,971                       52.4% 0.0% INFORMATION TECHNOLOGY 2,508,579               2,028,554                   80.9% 0.0% LIBRARY AND COMMUNITY SERVICES 3,256,361               1,658,337                   50.9% 12.6% MAINTENANCE SERVICES 3,440,730               1,342,412                   39.0% 15.7% MAYOR AND COUNCIL 414,403                   113,399                       27.4% 0.0% POLICE 53,556,800             6,926,397                   12.9% 6.5% PUBLIC WORKS ‐ ENGINEERING & T 4,969,082               604,014                       12.2% 22.3% PUBLIC WORKS ‐ UTILITIES & ENV ‐                            2,929                           0.0% 2.5% Development Breakdown
ADMINISTRATION 682,575                   50,663                         7.4% 14.7% PLANNING 2,300,280               1,596,190                   69.4% 14.7% BUILDING INSPECTION 2,399,615               1,145,894                   47.8% 14.7% CODE ENFORCEMENT 1,386,085               307,616                       22.2% 14.7% Fire Breakdown
HAZARDOUS MATERIALS 749,681                   113,113                       15.1% 5.9% FIRE PREVENTION 1,850,219               390,682                       21.1% 5.9% OPERATIONS 27,262,441             3,391,141                   12.4% 5.9%

City of Hayward  Comprehensive User Fee Study  20
APPENDIX  B – FULLY  BURDENED  HOURLY  RATES
Below are fully burdened hourly rates on an average department scale and at the staff position level for all City personnel. The FBHRs were used to determine the full cost of each service detailed in Appendix C. They include the salary and benefit costs for each position as well as all applicable overhead amounts for each position.  For positions in central service departments, such as the City Clerk and Finance, the overhead of central service departments is not included, as that cost is recovered through the cost allocation plan.  When a central service department position works  on  a  fee  or  project  in  the  purview  of  an  operating  department,  the  overhead  rates  of  the  operating department (shown in Appendix A) will be applied to that central service positions’ salary and benefit rate for full cost recovery.  For any user fee service request that is outside the scope of the fees detailed in Appendix C, or for services for which there is no fee currently set up, the City can charge up to the full cost of the FBHR for personnel involved.

City of Hayward  Comprehensive User Fee Study  21

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
CITY ATTORNEYS OFFICE CITY  ATTORNEYS OFFICE 112.53
CITY CLERK CITY  CLERK 101.84
CITY MANAGERS OFFICE CITY  MANAGERS OFFICE 121.27
PUBLIC WORKS ‐ ENGINEERING & TP U B L I C  WORKS ‐ ENGINEERING & T 122.56 FINANCE FINANCE 90.38
FIRE FIRE 158.46
HUMAN RESOURCES HUMAN  RESOURCES 113.83
INFORMATION TECHNOLOGY INFORMATION  TECHNOLOGY 168.99
MAYOR AND COUNCIL MAYOR  AND COUNCIL 29.43
MAINTENANCE SERVICES MAINTENANCE  SERVICES 115.50
POLICE POLICE 132.30
LIBRARY AND COMMUNITY SERVICES LIBRARY  AND COMMUNITY SERVICES 106.85 PUBLIC WORKS ‐ UTILITIES & ENV PUBLIC  WORKS ‐ UTILITIES & ENV 80.76 PLANNING PLANNING 163.58
BUILDING INSPECTION BUILDING  INSPECTION 142.87
CODE ENFORCEMENT CODE  ENFORCEMENT 105.15
FIRE HAZARDOUS  MATERIALS 165.21
FIRE FIRE  PREVENTION 221.26
FIRE OPERATIONS 160.76

City of Hayward  Comprehensive User Fee Study  22

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
BUILDING INSPECTION Bldg: Administrative  Clerk II 88.04 BUILDING INSPECTION Bldg: Building  Inspector 146.72
BUILDING INSPECTION Bldg: City Building  Official 232.83 BUILDING INSPECTION Bldg: Permit Technician 112.61
BUILDING INSPECTION Bldg: Plan Checker 118.39
BUILDING INSPECTION Bldg: Plan Checking Engineer 190.67 BUILDING INSPECTION Bldg: Secretary 110.17
BUILDING INSPECTION Bldg: Senior Permit Technician 108.32 BUILDING INSPECTION Bldg: Senior Plan Checker 153.46
BUILDING INSPECTION Bldg: Sr Bldg Inspector/Electrical 170.38 BUILDING INSPECTION Bldg: Sr Bldg Inspector/Plum ‐Mech 167.28 BUILDING INSPECTION Bldg: Sr Bldg Inspector/Structural 159.39 BUILDING INSPECTION Bldg: Supervising  Building  Inspector 179.81 BUILDING INSPECTION Bldg: Supervising  Plan Chkr & Exped 172.72 CITY ATTORNEYS OFFICE CA: Assistant City Attorney 125.94 CITY ATTORNEYS OFFICE CA: City Attorney 175.87
CITY ATTORNEYS OFFICE CA: Deputy City Attorney II 96.83 CITY ATTORNEYS OFFICE CA: Legal Secretary II 76.84
CITY ATTORNEYS OFFICE CA: Paralegal 79.72
CITY CLERK CC: City Clerk 127.01
CITY CLERK CC: Deputy City Clerk 99.92
CITY CLERK CC: Management Analyst II 103.50
CITY CLERK CC: Senior Secretary 76.92
ADMINISTRATION CD Admin: Administrative  Clerk II 53.21 ADMINISTRATION CD Admin: Administrative  Secretary 78.85 ADMINISTRATION CD Admin: Dep Dir Of Dev Services 163.05 ADMINISTRATION CD Admin: Director Of Development  Svcs 184.55 ADMINISTRATION CD Admin: Management Analyst II 103.37
CODE ENFORCEMENT Code:  Administrative  Clerk I 73.60
CODE ENFORCEMENT Code:  Administrative  Clerk II 74.47
CODE ENFORCEMENT Code:  Code Enforcement Inspector II 116.78 CODE ENFORCEMENT Code:  Code Enforcement Supervisor 134.40 CODE ENFORCEMENT Code:  Senior Secretary 84.20
CODE ENFORCEMENT Code:  Sr Code Enforcement Inspector 117.24 CITY MANAGERS OFFICE CM: Administrative  Clerk I 73.93
CITY MANAGERS OFFICE CM: Administrative  Clerk II 74.80 CITY MANAGERS OFFICE CM: Assistant City Manager 245.06
CITY MANAGERS OFFICE CM: Audio Video  Specialist 98.47

City of Hayward  Comprehensive User Fee Study  23

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
CITY MANAGERS OFFICE CM: City Manager 274.19
CITY MANAGERS OFFICE CM: Code Enforcement Inspector II 117.29 CITY MANAGERS OFFICE CM: Code Enforcement Supervisor 134.99 CITY MANAGERS OFFICE CM: Comm & Medi a Relations  Officer 137.15 CITY MANAGERS OFFICE CM: Econ Development  Specialist 124.27 CITY MANAGERS OFFICE CM: Economic Development  Manager 181.84 CITY MANAGERS OFFICE CM: Executive  Assistant 103.86
CITY MANAGERS OFFICE CM: Management Analyst II 126.55
CITY MANAGERS OFFICE CM: Management Fellow 54.68
CITY MANAGERS OFFICE CM: Neighborhood  Development  Mgr 187.44 CITY MANAGERS OFFICE CM: Senior Secretary 84.57
CITY MANAGERS OFFICE CM: Sr Code Enforcement Inspector 117.75 CITY MANAGERS OFFICE CM: Video  Assistant 47.19
CITY MANAGERS OFFICE CM: Web Specialist 123.76
PUBLIC WORKS - ENGINEERING & T Engin: Administrative  Secretary 82.77 PUBLIC WORKS - ENGINEERING & T Engin: Airport Maintenanceworker 93.31 PUBLIC WORKS - ENGINEERING & T Engin: Airport Manager 166.54 PUBLIC WORKS - ENGINEERING & T Engin: Airport Operations Supervisor 144.30 PUBLIC WORKS - ENGINEERING & T Engin: Assistant City Engineer 179.81 PUBLIC WORKS - ENGINEERING & T Engin: Assistant Transportation Engr 131.32 PUBLIC WORKS - ENGINEERING & T Engin: Assoc Civil  Engineer 133.66 PUBLIC WORKS - ENGINEERING & T Engin: Assoc Transportation Engineer 132.93 PUBLIC WORKS - ENGINEERING & T Engin: Assoc Transportation Planner 126.24 PUBLIC WORKS - ENGINEERING & T Engin: Construction Inspector 115.95 PUBLIC WORKS - ENGINEERING & T Engin: Director Of Public Works 230.98 PUBLIC WORKS - ENGINEERING & T Engin: Engineering  Technician 100.80 PUBLIC WORKS - ENGINEERING & T Engin: Management Analyst II 115.10 PUBLIC WORKS - ENGINEERING & T Engin: Noise  Abatement Analyst 80.87 PUBLIC WORKS - ENGINEERING & T Engin: Secretary 80.05
PUBLIC WORKS - ENGINEERING & T Engin: Senior Civil  Engineer 145.19 PUBLIC WORKS - ENGINEERING & T Engin: Senior Construction Inspector 133.78 PUBLIC WORKS - ENGINEERING & T Engin: Senior Secretary 84.47 PUBLIC WORKS - ENGINEERING & T Engin: Senior Transportation Engineer 160.96 PUBLIC WORKS - ENGINEERING & T Engin: Sr Airport Maintenance Worker 100.20 PUBLIC WORKS - ENGINEERING & T Engin: Supervising  Construction Insp 154.69 PUBLIC WORKS - ENGINEERING & T Engin: Survey Engineer 149.65 PUBLIC WORKS - ENGINEERING & T Engin: Surveyor 121.70
PUBLIC WORKS - ENGINEERING & T Engin: Traffic Signal Technician 101.88 PUBLIC WORKS - ENGINEERING & T Engin: Transportation Manager 146.37

City of Hayward  Comprehensive User Fee Study  24

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
FINANCE Fin: Accountant 84.50
FINANCE Fin: Accounting Manager 137.71
FINANCE Fin: Administrative  Clerk I 66.13
FINANCE Fin: Budget Officer 124.02
FINANCE Fin: Customer Account Clerk 62.19
FINANCE Fin: Data Systems Operator 67.22
FINANCE Fin: Deputy Director Of Finance 139.84
FINANCE Fin: Director Of Finance 208.66
FINANCE Fin: Finance Technician 90.75
FINANCE Fin: Mail & Purchasing Clerk 60.17
FINANCE Fin: Management Analyst II 100.41
FINANCE Fin: Purchasing & Services Manager 113.15
FINANCE Fin: Purchasing Technician 78.71
FINANCE Fin: Revenue  Manager 142.99
FINANCE Fin: Senior Account Clerk 76.15
FINANCE Fin: Senior Accountant 122.83
FINANCE Fin: Senior Customer Account Clerk 78.84
FIRE Fire: Administrative  Clerk II 61.35
FIRE Fire: Apparatus Operator (56 Hr) 159.41
FIRE Fire: Battalion Chief  (56 Hr) 227.54
FIRE Fire: Deputy Fire Chief  (40 Hr) 267.24
FIRE Fire: Emergency Medical Svcs Coord 115.32
FIRE Fire: Environmental  Specialist 123.72
FIRE Fire: Fire Captain (56 Hr) 180.92
FIRE Fire: Fire Chief 260.54
FIRE Fire: Fire Marshal (40 Hr) 212.02
FIRE Fire: Fire Prevention  Insp (40 Hr) 145.09
FIRE Fire: Fire Protection Engineer 134.41
FIRE Fire: Fire Services  Supervisor 117.58
FIRE Fire: Fire Services  Technician II 81.54
FIRE Fire: Fire Training Officer (40 Hr) 232.37
FIRE Fire: Firefighter  (56 Hr) 135.02
FIRE Fire: Haz Mat Investigator 100.96
FIRE Fire: Haz Mat Program Coordinator 136.88
FIRE Fire: Mai l Clerk 62.67
FIRE Fire: Management Analyst II 113.23
FIRE Fire: Senior Secretary 68.85
FIRE Fire: Staff Fire Captain (40 Hr) 180.59

City of Hayward  Comprehensive User Fee Study  25

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
HUMAN RESOURCES HR: Administrative  Intern 51.95
HUMAN RESOURCES HR: Director Of Human Resources 208.68
HUMAN RESOURCES HR: Human Resources Analyst II 121.22
HUMAN RESOURCES HR: Human Resources Technician 87.76
HUMAN RESOURCES HR: Senior Human Resources Analyst 134.72 INFORMATION TECHNOLOGY IT: Administrative  Secretary 136.06 INFORMATION TECHNOLOGY IT: Director Of Info Tech/Cio 240.86 INFORMATION TECHNOLOGY IT: Geographic Info Systems Coord 174.82 INFORMATION TECHNOLOGY IT: Information Technology Manager 195.99 INFORMATION TECHNOLOGY IT: It Analyst II 173.31
INFORMATION TECHNOLOGY IT: It Technician 152.99
INFORMATION TECHNOLOGY IT: Programmer Analyst 150.19
INFORMATION TECHNOLOGY IT: Tech Solutions  Analyst II 171.04 MAYOR AND COUNCIL M&C: City Council 26.24
MAYOR AND COUNCIL M&C: Mayor 48.57
MAINTENANCE SERVICES Maint: Administrative  Secretary 120.98 MAINTENANCE SERVICES Maint: Director Of Maintenance Svcs 204.79 MAINTENANCE SERVICES Maint: Electrician II 146.01
MAINTENANCE SERVICES Maint: Equipment Mechanic II 114.40 MAINTENANCE SERVICES Maint: Equipment Parts Storekeeper 106.21 MAINTENANCE SERVICES Maint: Facilities  & Building  Manager 161.76 MAINTENANCE SERVICES Maint: Facilities  Carpenter II 131.20 MAINTENANCE SERVICES Maint: Facilities  Painter II 128.50 MAINTENANCE SERVICES Maint: Facilities  Serviceworker  II 91.73 MAINTENANCE SERVICES Maint: Fleet  Management Supervisor 158.50 MAINTENANCE SERVICES Maint: Groundskeeper  I 101.42
MAINTENANCE SERVICES Maint: Groundskeeper  II 117.02
MAINTENANCE SERVICES Maint: Groundskeeper  III 105.21
MAINTENANCE SERVICES Maint: Hvac Mechanic 146.01
MAINTENANCE SERVICES Maint: Landscape Mai nt Supervisor 150.32 MAINTENANCE SERVICES Maint: Maintenance Leader 116.51
MAINTENANCE SERVICES Maint: Maintenance Worker 97.71
MAINTENANCE SERVICES Maint: Management Analyst II 143.70 MAINTENANCE SERVICES Maint: Senior Maintenance Leader 129.38 MAINTENANCE SERVICES Maint: Senior Secretary 97.33
MAINTENANCE SERVICES Maint: Streets Maintenance Manager 170.63 MAINTENANCE SERVICES Maint: Sweeper  Equipment Operator 108.27 MAINTENANCE SERVICES Maint: Tree Trimmer 118.14

City of Hayward  Comprehensive User Fee Study  26

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
PLANNING Plan: Administrative  Clerk II 104.64
PLANNING Plan: Assistant Planner 140.60
PLANNING Plan: Associate Planner 173.47
PLANNING Plan: Development  Review  Engineer 223.70
PLANNING Plan: Development  Review  Specialist 130.79
PLANNING Plan: Landscape Architect 195.15
PLANNING Plan: Planning Manager 231.60
PLANNING Plan: Principal Planner 229.38
PLANNING Plan: Secretary 105.81
PLANNING Plan: Senior Planner 178.73
PLANNING Plan: Senior Secretary 115.99
POLICE Police:   132.58
POLICE Police:  Administrative  Secretary 84.01
POLICE Police:  Animal Care Attendant 59.92
POLICE Police:  Animal Control Officer 68.74
POLICE Police:  Animal Services Administrator 119.31
POLICE Police:  Call Taker 74.87
POLICE Police:  Chief  Of Police 282.84
POLICE Police:  Communications Administrator 111.28
POLICE Police:  Communications Operator 86.07
POLICE Police:  Communications Supervisor 98.28
POLICE Police:  Community Service Officer 80.42
POLICE Police:  Counseling  Supervisor 117.95
POLICE Police:  Crime Analyst 113.95
POLICE Police:  Crime Prevention  Specialist 81.61
POLICE Police:  Crime Scene Technician 76.04
POLICE Police:  Environmental  Specialist 110.90
POLICE Police:  Family Counselor I 93.53
POLICE Police:  Inspector 179.06
POLICE Police:  Jail Administrator 116.56
POLICE Police:  Jail Supervisor 92.00
POLICE Police:  Operations Support Svcs Mgr 161.15
POLICE Police:  P & T Administrator 131.78
POLICE Police:  Police  Captain 236.89
POLICE Police:  Police  Lieutenant 215.17
POLICE Police:  Police  Officer 152.37
POLICE Police:  Police  Programs Analyst 105.74
POLICE Police:  Police  Records Clerk II 66.15

City of Hayward  Comprehensive User Fee Study  27

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
POLICE Police:  Police  Sergeant 188.94
POLICE Police:  Prop & Evidence Administrator 116.87
POLICE Police:  Property Technician 74.75
POLICE Police:  Records Administrator 112.10
POLICE Police:  Records Supervisor 92.76
POLICE Police:  Secretary 70.48
POLICE Police:  Senior Management Analyst 115.24
POLICE Police:  Shelter  Operations Supervisor 74.82
POLICE Police:  Shelter  Volunteer  Coord 66.72
POLICE Police:  Supervising  Librarian I 122.61
POLICE Police:  Yfsb Administrator 135.47
LIBRARY AND COMMUNITY SERVICES Rec: Administrative  Clerk II 96.81 LIBRARY AND COMMUNITY SERVICES Rec: Administrative  Secretary 111.64 LIBRARY AND COMMUNITY SERVICES Rec: Community Services Manager 172.28 LIBRARY AND COMMUNITY SERVICES Rec: Director Of Lib & Commty Svcs 258.78 LIBRARY AND COMMUNITY SERVICES Rec: Housing Development  Specialist 154.46 LIBRARY AND COMMUNITY SERVICES Rec: Info Systems Support Tech 126.52 LIBRARY AND COMMUNITY SERVICES Rec: Lead Library Assistant 93.53 LIBRARY AND COMMUNITY SERVICES Rec: Librarian I 109.87
LIBRARY AND COMMUNITY SERVICES Rec: Librarian I Pt 115.00 LIBRARY AND COMMUNITY SERVICES Rec: Library Assistant 79.09 LIBRARY AND COMMUNITY SERVICES Rec: Library Assistant Pt 78.37 LIBRARY AND COMMUNITY SERVICES Rec: Library Operations Manager 134.52 LIBRARY AND COMMUNITY SERVICES Rec: Library Page 35.95
LIBRARY AND COMMUNITY SERVICES Rec: Literacy Program Coordinator 122.49 LIBRARY AND COMMUNITY SERVICES Rec: Management Analyst II 152.90 LIBRARY AND COMMUNITY SERVICES Rec: Senior Library Assistant 102.14 LIBRARY AND COMMUNITY SERVICES Rec: Senior Library Page 63.99 LIBRARY AND COMMUNITY SERVICES Rec: Sr Property Rehab Spec 170.18 LIBRARY AND COMMUNITY SERVICES Rec: Supervising  Librarian I 135.17 LIBRARY AND COMMUNITY SERVICES Rec: Volunteer  Prog Asst 79.14 LIBRARY AND COMMUNITY SERVICES Rec: Volunteer  Prog Asst Pt 106.02 PUBLIC WORKS - UTILITIES & ENV Util: Accounting Manager 105.83 PUBLIC WORKS - UTILITIES & ENV Util: Administrative  Intern 51.93 PUBLIC WORKS - UTILITIES & ENV Util: Administrative  Secretary 68.25 PUBLIC WORKS - UTILITIES & ENV Util: Assoc Civil  Engineer 103.74 PUBLIC WORKS - UTILITIES & ENV Util: Assoc Civil  Engineer Pt 109.13 PUBLIC WORKS - UTILITIES & ENV Util: Backflow/Cross Connect Tester 70.04

City of Hayward  Comprehensive User Fee Study  28

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
PUBLIC WORKS - UTILITIES & ENV Util: Chemist 74.15
PUBLIC WORKS - UTILITIES & ENV Util: Cross Connect Control Spec 67.69 PUBLIC WORKS - UTILITIES & ENV Util: Director Of Public Works 171.83 PUBLIC WORKS - UTILITIES & ENV Util: Electrician II 95.09 PUBLIC WORKS - UTILITIES & ENV Util: Environmental  Services  Manager 122.56 PUBLIC WORKS - UTILITIES & ENV Util: Equipment Operator 69.97 PUBLIC WORKS - UTILITIES & ENV Util: Lab Supervisor 108.48 PUBLIC WORKS - UTILITIES & ENV Util: Laboratory Technician 79.35 PUBLIC WORKS - UTILITIES & ENV Util: Maintenance Worker 63.88 PUBLIC WORKS - UTILITIES & ENV Util: Management Analyst II 79.25 PUBLIC WORKS - UTILITIES & ENV Util: Operator‐In‐Training 72.38 PUBLIC WORKS - UTILITIES & ENV Util: Secretary 58.32
PUBLIC WORKS - UTILITIES & ENV Util: Senior Management Analyst 98.25 PUBLIC WORKS - UTILITIES & ENV Util: Senior Secretary 67.11 PUBLIC WORKS - UTILITIES & ENV Util: Senior Utilities  Engineer 108.60 PUBLIC WORKS - UTILITIES & ENV Util: Senior Utility Leader 85.69 PUBLIC WORKS - UTILITIES & ENV Util: Senior Utility Leader ‐ Sewer 90.05 PUBLIC WORKS - UTILITIES & ENV Util: Senior Utility Service Rep. 89.97 PUBLIC WORKS - UTILITIES & ENV Util: Solid  Waste Manager 108.00 PUBLIC WORKS - UTILITIES & ENV Util: Sr Utility Customer Svc Leader 82.94 PUBLIC WORKS - UTILITIES & ENV Util: Sr Wpsc Inspector 90.58 PUBLIC WORKS - UTILITIES & ENV Util: Storekeeper  ‐ Expediter 68.49 PUBLIC WORKS - UTILITIES & ENV Util: Sustainability  Tech/Assist 61.34 PUBLIC WORKS - UTILITIES & ENV Util: Technical Intern 52.86 PUBLIC WORKS - UTILITIES & ENV Util: Util Field  Svcs Supervisor 100.17 PUBLIC WORKS - UTILITIES & ENV Util: Utilities  Maintenance Mechani c 78.90 PUBLIC WORKS - UTILITIES & ENV Util: Utilities  O & M Manager 108.08 PUBLIC WORKS - UTILITIES & ENV Util: Utilities  O & M Supervisor 113.98 PUBLIC WORKS - UTILITIES & ENV Util: Utilities  Service Worker 60.02 PUBLIC WORKS - UTILITIES & ENV Util: Utility Leader 76.23 PUBLIC WORKS - UTILITIES & ENV Util: Utility Leader‐Sewer 79.79 PUBLIC WORKS - UTILITIES & ENV Util: Utility Worker 70.01 PUBLIC WORKS - UTILITIES & ENV Util: Utility Worker‐Sewer 68.03 PUBLIC WORKS - UTILITIES & ENV Util: Water Meter Mechanic 72.11 PUBLIC WORKS - UTILITIES & ENV Util: Water Meter Reader 66.25 PUBLIC WORKS - UTILITIES & ENV Util: Water Meter Reader Pt 64.41 PUBLIC WORKS - UTILITIES & ENV Util: Water Pollution  Control Admin 99.75 PUBLIC WORKS - UTILITIES & ENV Util: Wpcf Lead Operator 84.35

City of Hayward  Comprehensive User Fee Study  29

City of Hayward ‐ User Fee
Fully Burdened Hourly Rate Calculation ‐ Full Time Employees Department Dept/Position
Fully Burdened
Hourly Rate
PUBLIC WORKS - UTILITIES & ENV Util: Wpcf Maintenance Supervisor 113.65 PUBLIC WORKS - UTILITIES & ENV Util: Wpcf Manager 113.70 PUBLIC WORKS - UTILITIES & ENV Util: Wpcf Operations Supervisor 107.00 PUBLIC WORKS - UTILITIES & ENV Util: Wpcf Operator 68.41 PUBLIC WORKS - UTILITIES & ENV Util: Wpcf Ops & Maintenance Mgr 118.41 PUBLIC WORKS - UTILITIES & ENV Util: Wpsc Inspector 84.96 PUBLIC WORKS - UTILITIES & ENV Util: Wstewtr Coll Sys Sprvsr 107.56

City of Hayward  Comprehensive User Fee Study  30
APPENDIX  C – COST  RECOVERY  ANALYSIS  & SUGGESTED  FEE  LEVELS The following tables provide the results of the analysis, resulting full cost recovery amount, and recommended fees.

For fees in which the full cost, percent targeted cost recovery level, or percent change is listed as “NA”, the amount or percentage was not calculable based on cost data or variable fee structure.  This is most common when either the current or the suggested fee includes a variable component that is not comparable on a one to one basis, a full cost was not calculated (for penalties and fines), or when there is not a current fee amount to compare against.

All City Departments
Title Sub Title Unit Notes Full Cost  Current Fee
Cost Recovery
Level (%) Suggested Fee
Percent
Change
Administrative Citations First Violation NA                                  100.00  NA 100.00$                        0% Administrative Citations Second Violation NA                                  200.00  NA 200.00$                        0% Administrative Citations Third and Subsequent Violations NA                                  500.00  NA 500.00$                        0% CD‐ROM or DVD each 20.00$                                                20.00  100% 20.00$                          0% Dishonored or Returned Payment from Bank or
Credit Card If paid within 30 days of notification NA  $25 + check amount  100%  $25 + check amount  NA Dishonored or Returned Payment from Bank or
Credit Card If paid after 30 days of notification
Subject to forgiveness of all or a portion of the fee by the Director of Finance. As authorized by the California Civil Code 1719 but not less than $25.00
NA As authorized by Civil
Code 1719  100% As authorized by
Civil Code 1719  NA
Credit/Debit Card Payment Transaction Fee per transaction NA                                        3.95  100% 3.95$                               0% Clerk‐Assited Telephone Credit/Debit Card
Payment or 3%, whichever is greater NA                                        3.95  100% 3.95$                               0% Photocopying of File Materials Black and White Copy (letter or legals) per page Variable .5 first ten, .10 thereafter  100% .5 first ten, .10 thereafter  NA
Photocopying of File Materials
Black and White Copy (11x17) per page Variable 1.00 first ten, .20 thereafter  100% 1.00 first ten, .20
thereafter  NA
Photocopying of File Materials Color Copy (letter amd legal sizes) per page Variable                                       0.75  100% 0.75$                             0% Photocopying of File Materials Color Copy (11x17) per page Variable                                       1.50  100% 1.50$                             0% Research or Analysis of Records per hour involving more than 15 minutes (min $20 charge) 76.92$                                                39.00  100% 76.00$                          95% Smoking Ordinance Smokers Violating the Ordinance per violation NA                                     50.00  NA 50.00$                          0% Smoking Ordinance Fine for Business failure to enforce (1st Offense) NA                               1,000.00  NA 1,000.00$                     0% Smoking Ordinance Fine for Business failure to enforce (2nd Offense) NA                               1,500.00  NA 1,500.00$                     0% Smoking Ordinance Fine for Business failure to enforce (3rd Offense) NA                               2,000.00  NA 2,000.00$                     0% Tobacco Ordinance First Offense penalty; 30 day TRL suspension NA                               1,500.00  NA 1,500.00$                     0% Tobacco Ordinance Second Offense penalty; 30 day TRL suspension NA                               3,000.00  NA 3,000.00$                     0% Tobacco Ordinance Third Offense penalty; 30 day TRL suspension NA                               5,000.00  NA 5,000.00$                     0% Reinspection Fee 117.24$                                           125.00  100% 117.00$                        ‐6% 31 City Clerk
Title Sub Title Unit Notes Full Cost  Current Fee
Cost Recovery
Level (%) Suggested Fee
Percent
Change
Certification of Documents First Page 13.32$                                15.00  100% 13.00$            ‐13% Certification of Documents Each Succeeding Pages per page 6.91$                                    6.00  100% 7.00$              17% Certificate of Residency per issuance 19.23$                                15.00  78% 15.00$            0% Photocopying of Public Records Black & White Copy: 8.5x11 or 14 first page Variable                        0.50  100% 0.50$               0% Photocopying of Public Records Black & White Copy: 8.5x11 or 14 each
subsequent
page
same document Variable                        0.10  100% 0.10$               0% Photocopying of Public Records Black & White Copy: 11x17 first page Variable                        1.00  100% 1.00$               0% Photocopying of Public Records Black & White Copy: 11x17 each
subsequent
page
same document Variable                        0.20  100% 0.20$               0% Photocopying of Public Records Color Copy: 8.5x11 or 14 per page Variable                        0.75  100% 0.75$               0% Photocopying of Public Records Color Copy: 11x17 per page Variable                        1.50  100% 1.50$               0% Photocopying of Public Records Photocopying of FPPC forms/statements per  page Per  Government Code 81008 NA                        0.10  100% 0.10$               0% Traffic Code NA                     10.00  NA 10.00$            0% Traffic Regulations NA                     10.00  NA 10.00$            0% Reproduction of DVD of
Meetings  City Council per Disc admin  fee +actual contractor's invoice charges 20.00$                                  20.00  100% 20.00$             0% Reproduction of DVD of
Meetings  Planning Commission per Disc admin  fee +actual contractor's invoice charges 20.00$                                  20.00  100% 20.00$             0% Publication of "Notice of Intent
to Circulate a Petition for
Municipal Initiative"
refundable if a sufficient petition is filed within one year; Per Cal Election Code 9202b NA                   200.00  NA 200.00$           0% Election Year Publication cost of the candidate's
statement in the sample ballot pamphlet Variable actual printer cost  100% actual printer
cost  NA
Notary Service per document set by state statute NA                     10.00  NA 10.00$            0% Passport Service Passport Fee (age 16 and over) Set and Payable to US Dept of State NA                  110.00  NA 110.00$          0% Passport Service Passport Fee (under 16) Set and Payable to US Dept of State NA                     80.00  NA 80.00$            0% Passport Service Passport Execution Fee Set by US Dept of State, Payable to City of Hayward NA                      25.00  NA 25.00$             0% Passport Service Express Mail from COH to LA Set by USPS, Payable to City of Hayward NA                     22.95  NA Set by USPS  NA Passport Service Express Mail from State to Customer Set and Payable to US Dept of State NA                      20.66  NA Set by US Dept of State  NA
Passport Service Passport Photo Payable to City of Hayward 19.23$                                  7.50  39% 7.50$              0% 32 Finance
Title Sub Title Unit Notes Full Cost  Current Fee
Cost Recovery
Level (%) Suggested Fee
Operating Permits Bingo Permit ‐ Initial or Renewal 28.85$                                         50.00  100% 28.00$ Operating Permits Card Club Permit ‐ Application Fee 94.67$                                         40.00  100% 94.00$ Operating Permits Card Club Permit ‐ Annual Table Fee per table 142.01$                                8,693.00  100% 142.00$ Operating Permits Closeout Sale Permit ‐ Initial Fee 24.50$                                         76.00  100% 24.00$ Operating Permits Closeout Sale Permit ‐ Renewal 24.50$                                         67.00  100% 24.00$ Operating Permits Cabarets and Dance Licenses and Permits:

Annual License per year payable  quarterly in advance 24.50$                                       103.00  100% 24.00$ Operating Permits Preferential Parking Permit ‐ Initial Fee & Biennial Renewal Fee up to two residential or visitor permits

18.55$                                         50.00  100% 18.00$ Operating Permits Preferential Parking Permit ‐ Each additional residential permit 6.68$                                             25.00  100% 6.00$ Operating Permits Preferential Parking Permit ‐ Each additional visitor permit 6.68$                                             25.00  100% 6.00$ Operating Permits Preferential Parking Permit ‐ Permit
Replacement Fee 11.87$                                           10.00  100% 11.00$ Operating Permits Tobacco Retailer License ‐ Initial or Renewal Fee 10.37$                                       400.00  100% 10.00$ Miscellaneous Fees Monthly Listing of New Hayward Based Businesses per month 15.12$                                            5.50 100% 15.00$ Miscellaneous Fees Business Verification/Ownership Research per  business 23.51$                                            8.00 100% 23.00$ Miscellaneous Fees Parking Tax Offset Fee 2.50$                                              2.50 100% 2.50$ Miscellaneous Fees Credit/Debit Card Payment Transaction Fee per Transaction 3.95$                                              3.95 100% 3.95$ Miscellaneous Fees Clerk‐Assisted Telephone Credit/Debit Card Payment 2.50$

3.95 or 3%
whichever is higher  100% 2.50$
Annual Business License Processing Fee Cost for maintaining/processing business records in our Munis system ‐ Database Fee per record

19.31$                 New  52% 10.00$
Customer Initiated Chargeback Fee Cost recovery for time spent processing chargebacks.  per chargeback 62.40$                 New  40% 25.00$ 33 City Manager
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Administrative Services Economic Development Committee Agenda per year 4.00 $                                                 4.00  100% $                            4.00  0% Administrative Services Economic Development Committee Minutes per year 4.00 $                                                 4.00  100% $                            4.00  0% Administrative Services Economic Profile or Plan each 5.00 $                                                 5.00  100% $                            5.00  0% Administrative Services Annual  Bonds Issue Fees NA  1/8 of 1% of bond amount  NA 1/8 of 1% of bond amount  NA
Administrative Services Low Income Mortgage  Credit NA 2% of first year's credit payable as part of State Fee  NA
2% of first year's
credit payable as part
of State Fee
NA
Economic Development
Hayward Film Permit Film Permit applications per day NA                                      125.00  NA $                        125.00  0% Economic Development Hayward  Film Permit Expedited Film Permit (3‐5 days) excludes larger productions NA                                       250.00  NA  $                        250.00  0% Economic Development Hayward  Film Permit Film Permit (TV series, movies, feature films, pilots) per day NA                                       175.00  NA  $                        175.00  0% Economic Development Hayward  Film Permit Minor Encroachment Permit (filming) flat fee excluding work to be performed by Public Works, i.e. no traffic control plan provided, just review NA                                       834.00  NA  $                        834.00  0% Economic Development Hayward  Film Permit Major Encroachment Permit (filming) flat fee includes  work from Public Works, traffic control plan NA                                    1,507.00  NA  $                    1,507.00  0% Economic Development Hayward  Film Permit Police clearance (filing) hourly NA                                       105.00  NA  $                        105.00  0% Economic Development Hayward  Film Permit Fire Permit (filming) flat fee does not  include cost if presence is required at event NA                                       100.00  NA  $                        100.00  0% Economic Development
Hayward Film Permit Filming on City Property/Facilities/Hangers (varies) per day
Airport Property and Hangars‐ filming and photography
requests will be authorized at the discretion of the Airport Manager provided that the requested activity will in no way interfere with the safe, orderly and uninterrupted use of Airport facilities by Airport users or portrays the Airport in a negative manner. (extra labor, security, engineering or comparable cost are not included)
NA                                    1,500.00  NA  $                    1,500.00  0% Economic Development
Hayward Film Permit Filming at City Hall per day Does not  include cost of guard, janitorial and insurance NA                                       575.00  NA  $                        575.00  0% 34 Planning
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Planning Pre Application  Meeting NA No Charge  0% No Charge NA Planning Code  Assistance Meeting NA No Charge  0% No Charge NA Planning Annexation  Proceedings Deposit NA                                 15,000.00  100% 15,000.00$                     0% Planning LAFCO  Utility Service Agreement Deposit Preparation of documents in connection with utility service to property outside of the City limits NA                                    5,000.00  100% 5,000.00$                         0% Planning Environment Assessment (Contract) Consultant
Oversight Deposit NA                                    5,000.00  100% 5,000.00$                         0% Planning General  Plan Amendment Deposit NA                                 12,000.00  100% 12,000.00$                     0% Planning Text  Change to Zoning Ordinance Deposit NA                                 12,000.00  100% 12,000.00$                     0% Planning Rezoning  and Prezoning Deposit Including New or Major Modification to a Planned Development NA                                  12,000.00  100% 12,000.00$                       0% Planning Rezoning Deposit Planned Development Precise Plan or Preliminary Plan Minor Modification NA                                    6,000.00  100% 6,000.00$                         0% Planning Conditional  Use Permit Deposit NA                                   6,000.00  100% 6,000.00$                       0% Planning Administrative  Use Permit Chickens Per
Application NA                                        500.00  NA 500.00$                            0% Planning Administrative  Use Permit Food Vendors Per Box NA                                       700.00  NA 700.00$                          0% Planning Administrative  Use Permit Unattended Collection Boxes Deposit NA                                   1,300.00  100% 1,300.00$                       0% Planning Administrative  Use Permit Processed Administratively Deposit NA                                   2,000.00  100% 2,000.00$                       0% Planning Administrative  Use Permit Involving Public Hearing Deposit NA                                   6,000.00  100% 6,000.00$                       0% Planning Site  Plan Review Processed Administratively Deposit NA                                   2,000.00  100% 2,000.00$                       0% Planning Site  Plan Review Involving Public Hearing Deposit NA                                   6,000.00  100% 6,000.00$                       0% Planning Variance/Warrants  ‐ Processed Administratively Deposit NA                                   2,000.00  100% 2,000.00$                       0% Planning Variance/Warrants & Exceptions ‐ Involving Public Hearing Deposit NA                                    6,000.00  100% 6,000.00$                         0% Planning Modifications of Approved Development Plan ‐
Processed Administratively Deposit NA                                    2,000.00  100% 2,000.00$                         0% Planning Modification of Rehearing Approved Development Plan ‐ Involving Public Hearing Deposit NA                                    6,000.00  100% 6,000.00$                         0% Planning Extension of Approved Development Plan/
Applications
Extension of Approved Development Plan/
Applications Deposit NA                                    1,000.00  100% 1,000.00$                         0% Planning Designation  of Historical or Architectural Significance Deposit NA                                    6,000.00  100% 6,000.00$                         0% Planning Development  Agreement Annual Review Deposit NA                                 12,000.00  100% 12,000.00$                     0% Planning Development  Agreement Amendment Processing Deposit NA                                   6,000.00  100% 6,000.00$                       0% Planning Development  Agreement
Review of application, negotiation of
agreements. Processing through Planning
Commision and City Council
Deposit NA                                    1,000.00  100% 1,000.00$                         0% Planning Written Verification of Zoning Designation or Similar Requests
Per
Application NA                                        500.00  NA 500.00$                            0% Planning Research
Per hour after
first 15
minutes
$41 for first 15 minutes 163.58$                   $216 plus $41  100% 163.00$                            NA Planning Zoning  Conformance Permit Per
Application NA                                        210.00  NA 210.00$                            0% Planning Sign  Permits One Business 327.16$                                                      300.00  100% $                          327.00  9% Planning Sign  Permits Each Additional Business ‐ same
application 327.16$                                                         250.00  100%  $                          327.00  31% Planning Sign  Permits Temporary Sign Permit Deposit
Banners, Flags, Streamers, Pennants, Bunting,
Searchlights, Inflatable Signs, Human Signs; plus $200
Deposit
NA  $100 fee + $200  100%  $100 fee + $200  NA
Planning Sign  Permits Portable/A‐Fram Signs Revocable Encroachment Permit 327.16$                                                        50.00  100% $                          327.00  554% Planning Sign  Permits Mural Art Signs Registration Fee 490.74$                                                        50.00  100% $                          490.00  880% Planning Sign  Program 817.91$                                                  1,500.00  100% $                          817.00 ‐ 46% Planning Appeal  Fee for Applicant Deposit NA                                   6,000.00  100% $                       6,000.00  0% Planning Appeal  Fee Other Than Applicant 408.95$                                                      250.00  100% $                          408.00  63% Planning
Tentative Tract or Tentative Parcel Map Processed Administratively Deposit NA                                   4,000.00  100% $                       4,000.00  0% Planning Tentative  Tract or Tentative Parcel Map Involving Public Hearing Deposit NA                                   6,000.00  100% $                       6,000.00  0% Planning Final  Parcel Map Deposit NA                                   2,000.00  100% $                       2,000.00  0% Planning Final  Tract Map Deposit NA                                   6,000.00  100% $                       6,000.00  0% 35 Planning
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Planning Lot  Line Adjustment Deposit NA                                   4,000.00  100% $                       4,000.00  0% Planning Certificate  of Merger or Certificate of Compliance Deposit NA                                   4,000.00  100% $                       4,000.00  0% Planning Grading  Permit Application 1,635.82$                                               4,000.00  100% $                       1,635.00 ‐ 59% Planning Security  Gate Application 1,635.82$                                               2,000.00  100% $                       1,635.00 ‐ 18% Planning Encroachment  Permit ‐ Street Events The City Manager may waive this fee for certain events 2,944.47$                                                  1,500.00  100%  $                       2,944.00  96% Planning
Encroachment Permit Application ‐ Major Work 2,453.72$                                               4,000.00  100% $                       2,453.00 ‐ 39% Planning Encroachment  Permit Application ‐ Minor Work 1,308.65$                                               2,000.00  100% $                       1,308.00 ‐ 35% Planning Food  Sharing Event NA No Charge  0% No Charge  NA Planning Tree  Preservation Annual Pruning Certification 817.91$                                                      126.00  100% $                          817.00  548% Planning Tree  Preservation Tree removal/pruning 490.74$                                                      211.00  100% $                          490.00  132% Planning
Mobilehome Park Closure/Change of Use 9,814.90$                                             12,000.00  100% $                       9,814.00 ‐ 18% Planning Review  of Building Permit Applications Commercial/Industrial Tenant Improvements or additions 490.74$                                                         416.00  100%  $                          490.00  18% Planning Review  of Building Permit Applications Addition ‐ Single Family Dwelling 327.16$                                                      274.00  100% $                          327.00  19% Planning Review  of Building Permit Applications Addition ‐ Multi Family Dwelling 327.16$                                                      568.00  100% $                          327.00 ‐ 42% Planning Review  of Building Permit Applications New accessory structure 327.16$                                                      186.00  100% $                          327.00  76% Planning Review  of Building Permit Applications New Single Family Dwelling 490.74$                                                      499.00  100% $                          490.00 ‐ 2% Planning Review  of Building Permit Applications New Single Family Dwelling ‐ Hillside 490.74$                                                      721.00  100% $                          490.00 ‐ 32% Planning Review  of Building Permit Applications New Industrial Building 654.33$                                                      686.00  100% $                          654.00 ‐ 5% Planning Review  of Building Permit Applications New Commercial Building 654.33$                                                      742.00  100% $                          654.00 ‐ 12% Planning
Review of Building Permit Applications Over‐the Counter approvals 163.58$                                                      149.00  100% $                          163.00  9% Planning Inspections  ‐ Planning and Landscape Single Family Residential ‐ Subdivision 1,145.07$                                                   212.00  100% $                       1,145.00  440% Planning Inspections  ‐ Planning and Landscape Multi Family Residential Development 1,145.07$                                                   319.00  100% $                       1,145.00  259% Planning Inspections  ‐ Planning and Landscape Single Family Residential ‐ Hillside 817.91$                                                      255.00  100% $                          817.00  220% Planning
Inspections ‐ Planning and Landscape Re‐Inspection 490.74$                                                      212.00  100% $                          490.00  131% Planning Inspections  ‐ Planning and Landscape Miscellaneous 327.16$                                                        79.00  100% $                          327.00  314% Planning General Plan Update Fee 12 % of Building Permit Fee NA  12% of Building Permit Fee  100% 12% of Building Permit Fee  NA
36 Code Enforcement ‐ Rental Housing & Hotel Inspection Fee Group Title Sub  Title Unit Notes Full  Cost  Current Fee Cost Recovery
Level (%)
Suggested
Fee
Percent
Change
Rental Housing & Hotel
Inspection Fees and Penalties Annual fee for rental housing, hotel or motel units Single  Family, duplex, triplex or fourplex 88.51$                                                       41.00  100%  $         88.51  116% Rental Housing & Hotel
Inspection Fees and Penalties Annual fee for rental hous ing,  hotel or motel units Five  or more units per  unit 22.13$                                                       10.00  100%  $         22.13  121% Rental Housing & Hotel
Inspection Fees and Penalties
Request for postponement of initial inspection or
prograss check First request ‐$                  No Charge  100%  No Charge  NA Rental Housing & Hotel
Inspection Fees and Penalties
Inspection, report and en forcement  actions pursuant
to HMC, Ch.9, Art. 5. Rental unit parcels Initial Inspection (No violations found) 350.33$           No Charge  100% Included in Annual Fee  NA
Rental Housing & Hotel
Inspection Fees and Penalties
Inspection, report and enforcement actions pursuant
to HMC, Ch.9, Art. 5. Rental unit parcels Initial Inspection (Violations found) 350.33$ $272 per pa rcel  + $27
hotel/motel room with
violation
100%  $       350.33  NA
Rental Housing & Hotel
Inspection Fees and Penalties
Inspection, report and enforcement actions pursuant
to HMC, Ch.9, Art. 5. Rental unit parcels
Progress Checks ‐ First Progress Check
(Violations corrected) 350.33$           No Charge  100%  No Charge  NA Rental Housing & Hotel
Inspe
ction Fees and Penalties
Inspection, report and enforcement actions pursuant
to HMC, Ch.9, Art. 5. Rental unit parcels
Progress Checks ‐ First Progress Check
(Violations not corrected) 350.33$
$154 per parcel + $53
hotel/motel room with
violation
100%  $       350.33  NA
Rental Housing & Hotel
Inspection Fees and Penalties
Inspection, report and enforcement actions purs uant
to HMC, Ch.9, Art. 5. Rental unit parcels Progress Checks ‐ Second Progress Check plus $400 penalty 350.33$ $154 per parcel + $53
hotel/motel room with
violation + $200 penalty
100%  $       350.33  NA
Rental Housing & Hotel
Inspection Fees and Penalties
Inspection, report and enforcement actions pursuant
to HMC, Ch.9, Art. 5. Rental unit parcels Progress Checks ‐ Third Progress Check plus  $800 penalty 350.33$ $154 per parcel + $53
hotel/motel room with
violation + $400 penalty
100%  $       350.33  NA
Rental Housing & Hotel
Inspection Fees and Penalties
Inspection, report and enforcement actions pursuant
to HMC, Ch.9, Art. 5. Rental unit parcels
Progress Checks ‐ Fourth and subsequent
Progress Check plus $1600 penalty 350.33$
$154 per parcel + $53
hotel/motel room with
violation + $800 penalty
100%  $       350.33  NA
Rental Housing & Hotel
Inspection Fees and Penalties
Initial Inspection or Progress Check ‐ No Access or Re‐ schedule No Access ‐ First Site Visit plus $400 penalty 116.78$                                                  100.00  100%  $       116.78  17% Rental Housing & Hotel
Inspection Fees and Penalties
Initial Inspection or Progress Check ‐ No Access or Re‐ schedule No Access ‐  Second Site Visit plus $800 penalty 116.78$                                                  200.00  100%  $       116.78 ‐ 42% Rental Housing & Hotel
Inspection Fees and Penalties
Initial Inspection or Progress Check ‐ No Access or Re‐ schedule No Access ‐ Third and subsequent Site Visit plus $1600 penalty 116.78$                                                  400.00  100%  $       116.78 ‐ 71% Rental Housing & Hotel
Inspection Fees an d  Penalties
Rent Control Deregulation Inspection pursuant to
Ord. No. 83‐023, as amended
Initial inspection/survey and one re‐
inspection 700.65$                                                  246.00  100%  $       700.65  185% Rental Housing & Hotel
Inspection Fees and Penalties
Rent Control Deregulation Inspection pursuant to
Ord. No. 83‐023, as amended Additional re‐inspections per inspection 350.33$                                                  154.00  100%  $       350. 33  127% Rental Housing & Hotel
Inspection Fees and Penalties Lien (per parcel) 630.90$                                                  342.00  100%  $       630.90  84% Rental Housing & Hotel
Inspection Fees and Penalties AdministrativeHearing Fee 946.35$                                                  225.00  100%  $       946.35  321% 37 Code Enforcement ‐ Community Preservation Program
Fee Group Title Sub  Title Unit Notes Full  Cost  Current Fee Cost Recovery
Level (%) Suggested  Fee
Percent
Change
Community Preservation
Program Request for Postponement of Inspection  1st Request 84.20$                  No Charge  100%  $            84.00  NA Community Preservation
Program Request for Postponement of Inspection  2nd Request plus  $100 penalty 84.20$                  No Charge  100%  $            84.00  NA Community Preservation
Program Request for P ostponement  of Inspection  3rd Request plus  $200 penalty 84.20$                  No Charge  100%  $            84.00  NA Community Preservation
Program Request for Postponement of Inspection  "No Show" for Inspection plus  $200 penalty 392.68$                                175.00  100%  $          392.00  124% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances First Violation (Initial inspection) 626.70$                No Ch arge  100%  $          626.00  NA Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
First Violation (Reinspection shows violation
eliminated) 626.70$                No Charge  100%  $          626.00  NA Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
First Violation (Reinspection shows violation
s
till exists) plus $100 penalty 626.70$                                522.00  100%  $          626.00  20% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
First Violation (Second inspection shows
violation still exists) plus $200 penalty 626.70$                                522.00  100%  $          626.00  20% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement an d Zoning Ordinances
First Violation (Third inspection shows
violation still exists) plus $500 penalty 626.70$                                522.00  100%  $          626.00  20% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
First Violation (Fourth inspection shows
violation still exists) plus $500 penalty 626.70$                                522.00  100%  $          626.00  20% Community Preservation
Pro
gram
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
First Violation (fifth and subsequent
inspections shows violation still exists) plus $500 penalty 626.70$                                522.00  100%  $          626.00  20% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
Subsequent violation within 1 year (Initial
inspection and not ices) plus $800 penalty 743.71$                                651.00  100%  $          743.00  14% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances
Subsequent violation within 1 year (Each
subsequent inspection violation still exists) plus $1000 penalty 626.70$                                506.00  100%  $          626.00  24% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed A
batement and Zoning Ordinances Abatement Costs per parcel plus  contractor costs 1,325.86$                             992.00  75%  $          992.00  0% Community Preservation
Program
Violation of Community Preservation, Sign, Vehicle,
Weed Abatement and Zoning Ordinances Lien/Special Assessment Processing per  parcel 1,811.98$                             342.00  19%  $          342.00  0% Community Preservation
Program   Hearing Fee per hearing Administrative, special Assessment, Administrative Citation, and Li en  Hearings 761.10$                                225.00  100%  $          761.00  238% 38 Police
Fee Group 1 Fee Group 2 Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Animal Control Impounding Charges For each dog and cat 1st impoundment 86.03$                                         35.00  100% $                        86.00  146% Animal Control Impounding Charges For each dog and cat 2nd impoundment within one year 81.03$                                         75.00  100% $                        81.00  8% Animal Control Impounding Charges For each dog and cat 3rd impoundment within one year 149.77$                                   150.00  100% $                     149.00 ‐ 1% Animal Control
Impounding Charges For each dog and cat Impound dangerous animal 148.67$                                   150.00  100% $                     148.00 ‐ 1% Animal Control Impounding Charges For each dog and cat Field Impound 125.75$                                   100.00  100% $                     125.00  25% Animal Control Impounding Charges
For any unsterilized dog or cat impounded, an
additional fee is assessed as mandated by the
State of California Food & Agricultural Code.
1st  Impoundment State mandated penalty ‐ F & A 30804.7 NA                            35.00  NA  $                        35.00  0% Animal Control Impounding Charges
For any unsterilized dog or cat impounded, an
additional fee is assessed as mandated by the
State of California Food & Agricultural Code.
2nd Impoundment
State mandated penalty ‐ F & A 30804.7 NA                            50.00  NA  $                        50.00  0% Animal Control Impounding Charges
For any unsterilized dog or cat impounded, an
additional fee is assessed as mandated by the
State of California Food & Agricultural Code.
3rd Impoundment  State mandated penalty ‐ F & A 30804.7 NA                         100.00  NA  $                     100.00  0% Animal Control
Impounding Charges For each horse, bull, cow, steer, calf, colt, sheep, lamb, goat or hog  1st impoundment minimum $40 (Charge will be total direct) Variable  Case by Case  100%  Case by Case  NA Animal Control Impounding Charges For each horse, bull, cow, steer, calf, colt, sheep, lamb, goat or hog  2nd impoundment within one year minimum $40 Variable  Case by Case  100%  Case by Case  NA Animal Control Impounding Charges For each horse, bull, cow, steer, calf, colt, sheep, lamb, goat or hog  3rd impoundment within one year minimum $40 Variable  Case by Case  100%  Case by Case  NA Animal Control Impounding Charges   For each non‐specified animal (rabbit, monkey, rat, etc.) minimum $40 Variable  Case by Case  100%  Case by Case  NA Animal Control Feeding and Boarding Charges   For each dog, cat or small domestic pet per  day 30.98$                                         14.00  100% $                        30.00  114% Animal Control
Feeding and Boarding Charges   Special needs animal (medications given, treatment) per day 39.97$                                           30.00  100%  $                        39.00  30% Animal Control Feeding and Boarding Charges   For each horse, bull, cow, hog, steer, lamb, sheep, goat, colt, or calf. per day minimum (RTO); Fees will depend on actual board cost charged by ranch or  3rd party facility Variable                            10.00  100% Based on Animal Needs  NA
Animal Control
Feeding and Boarding Charges   For each non‐specified animal per day minimum  (RTO) 19.97$                                           2.00  100% $                        19.00  850% Animal Control Special Services
Owner surrender of adult unlicensed
animals (includes boarding fees for the
State mandated holding period)
per animal plus 4 days of mandated board charged
seperately 46.52$                                           85.00  58%  $                        27.00 ‐ 68% Animal Control Special Services
Owner surrender of additional animals less
than ten weeks of age.  Boarding fees for
the State mandated holding period will also
be charged.
per animal 13.29$                                             5.00  100%  $                        13.00  160% Animal Control Special Services   Owner surrenders ‐ small animals/bird per  animal 46.52$                                         30.00  100% $                        46.00  53% Animal Control Special Services   Owner brings dead animal to shelter for disposal (Under 50 lbs.) per animal 37.02$                                           54.00  100%  $                        37.00 ‐ 31% Animal Control Special Services   Owner brings dead animal to shelter for disposal (Over 50 lbs..) per animal 42.01$                                            67.00  100%  $                        42.00 ‐ 37% Animal Control Special Services   Transport fee for any owned animal, live or dead, transported to shelter per animal 96.73$                                        133.00  100%  $                        96.00 ‐ 28% Animal Control Special Services
Transportation of stray injured or sick
animal to a veterinarian, where owner is
later identified.

Variable  Case by Case  100%  Case by Case  NA
Animal Control
Special Services
Veterinary treatment provided to an animal
housed in the Shelter where the owner is
later identified
Variable  Actual Vet Costs  100%  Actual Vet Costs  NA
Animal Control Special Services   Rabies vaccination certificate Variable  Actual Vet Costs  100%  Actual Vet Costs  NA Animal Control
Special Services   Para‐influenza type vaccine Variable  Actual Vet Costs  100%  Actual Vet Costs  NA Animal Control Special Services   Medical Testing Minimum ($50 maximum) 17.98$                                         10.00  100% $                        17.00  70% Animal Control Special Services   Microchip Insertion (Animal adopted from the Shelter) 30.00$                                           15.00  100%  $                        29.00  93% Animal Control Special Services   Microchip Insertion (Animals not adopted from the Shelter) 30.00$                                            25.00  100%  $                        29.00  16% Animal Control Animal Licence and Permit Fees Unsterilized dog or cat Flat fee is for 1, 2 or 3 years depending on
Rabies Vaccination Certificate  (not to
exceed 3 years)

16.03$                                           17.00  100%  $                        16.00 ‐ 6% Animal Control Animal Licence and Permit Fees Unsterilized dog or cat Unsterilized animal penalty NA                           35.00  NA $                        35.00  0% Animal Control Animal Licence and Permit Fees Unsterilized dog or cat Unsterilized license renewal plus penalty NA                           17.00  NA $                        17.00  0% 39 Police
Fee Group 1 Fee Group 2 Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Animal Control Animal Licence and Permit Fees Sterilized dog or cat license Flat Fee is for 1, 2 or 3 years depending on
Rabies Vaccination Certificate duration (not
to exceed 3 years)

16.03$                                           17.00  100%  $                        16.00 ‐ 6% Animal Control Animal Licence and Permit Fees Sterilized dog or cat license Sterilized, license renewal 13.82$                                         17.00  100% $                        13.00 ‐ 24% Animal Control Animal Licence and Permit Fees Sterilized dog or cat license Late Penalty NA                             5.00  NA $                          5.00  0% Animal Control Animal Licence and Permit Fees Sterilized dog or cat license Replacement/Duplicate License 13.82$                                           8.00  100% $                        13.00  63% Animal Control
Animal Licence and Permit Fees Sterilized dog or cat license Seeing or hearing dog 16.03$               No Charge  0% No Charge  NA Animal Control Animal Licence and Permit Fees Sterilized dog or cat license Fancier's Permit 243.26$                                   250.00  100% $                     243.00 ‐ 3% Animal Control Pick‐up and Disposal of Dead Animals from Veterinarian   For 1 to 5 animals 107.89$                                         50.00  100%  $                     107.00  114% Animal Control Pick‐up and Disposal of Dead Animals from Veterinarian   For Over 5 animals each 12.50$                                           10.00  100%  $                        12.00  20% Animal Control Observation Fees
For each dog, cat or small domestic pet for
quarantine, evidence and protective
custody.
per day 4.49$                                             14.00  100%  $                          4.00 ‐ 71% Animal Control Observation Fees   Other Animals Variable  Actual Costs  100%  Actual Costs  NA Animal Control Observation Fees
Property inspections (required prior to
home quarantines and for the private
retention of all animals declared dangerous
outside a City of Hayward hearing).
per inspection 72.64$                                           53.00  100%  $                        72.00  36% Animal Control
Adoption Fees
The fees charged for dogs and cats offered
for adoption shall be set by the Animal
Services Manager.  In no case shall this
amount be less than $5.00. In no case shall
animals listed as "Owner Surrendered" be
adopted by the previous owner without
payment of all fees and charges (as
specified in the schedule) for shelter service
in impounding and caring for the animal.
minimum $5 Variable  Case by Case  100%  Case by Case  NA Animal Control
Adoption Fees   All Other Animals Variable Market Value  100% Market Value  NA Animal Control Adoption Fees   Spaying and neutering (mandated for dogs and cats prior to adoption) Variable Veterinary contract cost  100% Veterinary contract
cost  NA
Animal Control
Adoption Fees   Administrative processing fee for the return of animals adopted from the shelter 11.03$                                           10.00  100%  $                        11.00  10% Animal Control   Hearing Fee 496.63$                                   150.00  100% $                     496.00  231% Police Administration Photocopying  of Reports   Traffic Accident Reports per report 16.54$                                         12.00  100% $                        16.00  33% Police Administration
Photocopying of Reports   Other Reports per report 16.54$                                           5.50  100% $                        16.00  191% Police Administration   Photographs 24.92$                 Time & Motion  100%  $                        24.00  NA Police Administration   Fingerprinting each Fingerprint processing fees established by Federal or State agencies shall be additional charge 26.81$                                           23.00  100%  $                        26.00  13% Police Administration Traffic  & Police Security Services   Traffic control and police security services for pre‐planned, non‐city sponsored events Variable  Time & Motion  100%  Actual Cost  NA Police Administration
Traffic & Police Security Services   Planned traffic control for contractors and utilities Variable  Time & Motion  100%  Actual Cost  NA Police Administration Permit  Processing Taxi Drivers Initial Permit 609.48$                                   260.00  100% $                     609.00  134% Police Administration Permit  Processing Taxi Drivers Annual renewal 304.74$                                   186.00  100% $                     304.00  63% Police Administration Permit  Processing Taxi Drivers Annual taxi operating sticker 152.37$                                   247.00  100% $                     152.00 ‐ 38% Police Administration Permit  Processing Taxi Drivers Lost permit replacement 26.81$                                         91.00  100% $                        26.00 ‐ 71% Police Administration Permit  Processing Tow Permits Company 1st License 304.74$                                   297.00  100% $                     304.00  2% Police Administration
Permit Processing Tow Permits Company Annual Renewal 40.21$                                      297.00  100% $                        40.00 ‐ 87% Police Administration Permit  Processing Tow Permits Driver 1st License 304.74$                                   297.00  100% $                     304.00  2% Police Administration Permit  Processing Tow Permits Driver Annual Renewal 40.21$                                      297.00  100% $                        40.00 ‐ 87% Police Administration Permit  Processing Tow Permits Lost Permit Replacement 40.21$                                         74.00  100% $                        40.00 ‐ 46% Police Administration Permit  Processing Massage Establishment/technician permit Initial Inspection/application and processing of new massage establishment 761.85$                                      300.00  100%  $                     761.00  154% Police Administration Permit  Processing Massage Establishment/technician permit Annual Renewal fee for massage establishment 241.26$                                     150.00  100%  $                     241.00  61% Police Administration Permit  Processing Massage Establishment/technician permit Badge  Replacement 80.42$                                         76.00  100% $                        80.00  5% Police Administration Permit  Processing Massage Establishment/technician permit Massage Out‐Call initial inspection /application 761.85$                                      600.00  100%  $                     761.00  27% Police Administration Permit  Processing Massage Establishment/technician permit Massage  Out‐Call Renewal 241.26$                                   300.00  100% $                     241.00 ‐ 20% 40 Police
Fee Group 1 Fee Group 2 Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Police Administration Permit  Processing Card clubs employee permit Initial permit 241.26$                                   153.00  100% $                     241.00  58% Police Administration Permit  Processing Card clubs employee permit Annual renewal 160.84$                                   153.00  100% $                     160.00  5% Police Administration Permit  Processing Card clubs employee permit Lost permit replacement  80.42$                                         76.00  100% $                        80.00  5% Police Administration Permit  Processing   Auto Sales/Repair Permit 160.84$                                   175.00  100% $                     160.00 ‐ 9% Police Administration Permit Processing   Background investigation Variable  Time & Motion  100%  Time & Motion  NA Police Administration Permit  Processing   Firearm dealers annual permit 1,294.99$                                513.00  100% $                  1,294.00  152% Police Administration Permit  Processing   Diversion program Variable  Time & Motion  0%  Time & Motion  NA Police Administration Permit  Processing   Petty Theft Workshop per participant NA                            80.00  0%  $                        80.00  0% Police Administration Permit Processing   Other permit processing Variable  Time & Motion  100%  Time & Motion  NA Police Administration Permit  Processing   Alcohol Sales‐Special Event Permits 304.74$                                      42.00  100% $                     304.00  624% Police Administration Alarm  Permit Fee   new and annual renewal 16.54$                                         32.00  100% $                        16.00 ‐ 50% Police Administration Alarm  Permit Fee   Low income or persons in a temporary or permanent disabled status 22.05$                                            15.00  100%  $                        22.00  47% Police Administration False  Alarm Fees   First False Alarm Fee 185.45$            No Charge  100% $                     185.00  NA Police Administration False  Alarm Fees   Second False Alarm Fee 185.45$                                   182.00  100% $                     185.00  2% Police Administration False  Alarm Fees   Third False Alarm Fee plus $50 penalty 185.45$                                   182.00  100% $                     185.00  2% Police Administration
False Alarm Fees   Fourth False Alarm Fee plus $200 penalty 185.45$                                   182.00  100% $                     185.00  2% Police Administration False  Alarm Fees   Fifth and Each Fee plus $400 penalty 185.45$                                   182.00  100% $                     185.00  2% Police Administration   Vehicle  Release Fee 33.08$                                      235.00  100% $                        33.00 ‐ 86% Police Administration Vehicle  Verification or Administrative Fee   Onsite verification 76.18$                                         43.00  100% $                        76.00  77% Police Administration Vehicle  Verification or Administrative Fee   Offsite verification 152.37$                                   175.00  100% $                     152.00 ‐ 13% Police Administration   Communication  Tapes per tape 98.28$                                      103.00  100% $                        98.00 ‐ 5% Police Administration DVD or Flash Drive video requests 20.00$               New  100% 20.00$                        NA Police Administration   Clearance Letters
per letter 38.59$                                         43.00  100% $                        38.00 ‐ 12% Police Administration   Vehicle  Abatement per vehicle 160.84$                                   263.00  100% $                     160.00 ‐ 39% Police Administration Prisoner  Booking Fee   Cite & Release per prisoner NA                           89.00  NA $                        89.00  0% Police Administration Prisoner  Booking Fee   Hold for Court per prisoner NA                        180.00  NA $                     180.00  0% Police Administration Prisoner  Booking Fee   Transfer to Santa Rita per prisoner NA                        199.00  NA $                     199.00  0% Police Administration
Social Host Accountability Ordinance   First Violation per sec 4‐11.20 HMC ‐ PENALTY NA                        750.00  NA $                     750.00  0% Police Administration Social  Host Accountability Ordinance   Second Violation per sec 4‐11.20 HMC ‐ PENALTY NA                     1,500.00  NA $                  1,500.00  0% Police Administration Social  Host Accountability Ordinance   Third & Subsequent Violations per sec 4‐11.20 HMC ‐ PENALTY NA                     2,500.00  NA $                  2,500.00  0% Police Administration
Social Host Accountability Ordinance
Recovery of the cost of the public safety
response to a "Social Host" ordinance
violation using the fully burdened cost
allocation rate
per sec 4‐11.20 HMC ‐ PENALTY NA  Time & Motion  NA  Time & Motion  NA Police Administration   Firearms Range Maintenance  Fees apportions the upkeep of the firearms range
among user law enforcement agencies over a
fiscal year period
NA                      1,250.00  NA  $                  1,250.00  0% Police Administration Alcoholic  Beverage Outlets Fees   Level I per sec 10‐1.2750 HMC ‐ fee set in Alcohol ordinance NA                         280.00  NA  $                     280.00  0% Police Administration Alcoholic  Beverage Outlets Fees   Level II per sec 10‐1.2750 HMC ‐ fee set in Alcohol ordinance NA                      1,120.00  NA  $                  1,120.00  0% Police Administration Alcoholic  Beverage Outlets Fees   Critical Incident Fee per sec 10‐1.2750 HMC NA  Time & Motion  NA  Time & Motion  NA Police Administration Alcoholic  Beverage Outlets Fees   Violation of Ordinance: First Offense per sec 10‐1.2750 HMC ‐ PENALTY NA                        750.00  NA $                     750.00  0% Police Administration Alcoholic  Beverage Outlets Fees   Violation of Ordinance: Second Offense per sec 10‐1.2750 HMC ‐ PENALTY NA                     1,500.00  NA $                  1,500.00  0% Police Administration Alcoholic  Beverage Outlets Fees   Violation of Ordinance: Third Offense per sec 10‐1.2750 HMC ‐ PENALTY NA                     2,500.00  NA $                  2,500.00  0% Police Administration Alcoholic  Beverage Outlets Fees   Reinspection Fee per sec 10‐1.2750 HMC NA Time & Motion  NA Time & Motion  NA Police Administration Alcoholic  Beverage Outlets Fees   Alcohol Sales ‐ Special Event Permit per sec 10‐1.2750 HMC ‐ fee set in Alcohol ordinance NA                            42.00  NA  $                        42.00  0% 41 Fire Prevention
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Standard Hourly Rate   per hour 221.26$                                           210.00  100% 221.00$                       5% Overtime (Afterhour Inspection)   per hour 331.89$                                           316.00  100% 331.00$                       5% Expedited Plan Review per hour 331.89$                                           316.00  100% 331.00$                       5% New Fire Sprinkler Systems PLUS Hydraulic
Calculation  Fee* (See Below)   1‐29 Heads per floor or system 1,548.81$                                       1,476.00  100% 1,548.00$                     5% New Fire Sprinkler Systems PLUS Hydraulic
Calculation  Fee* (See Below)   30‐100 Heads per floor or system 1,880.70$                                       1,793.00  100% 1,880.00$                     5% New Fire Sprinkler Systems PLUS Hydraulic
Calculation  Fee* (See Below)   101‐200 Heads per floor or system 2,101.96$                                       2,004.00  100% 2,101.00$                     5% New Fire Sprinkler Systems PLUS Hydraulic
Calculation  Fee* (See Below)   201‐350 Heads per floor or system 2,433.85$                                       2,320.00  100% 2,433.00$                     5% New Fire Sprinkler Systems PLUS Hydraulic
Calculation  Fee* (See Below)   351+ Heads per floor or system 2,986.99$                                       2,847.00  100% 2,986.00$                     5% Fire Sprinkler —Tenant  Improvements
(PLUS Hydraulic Calculation Fee*, if
applicable)
LESS THAN 30 HEADS W/ NO HYDRO Minor plan check required‐only one inspection 663.78$                                              630.00  100% 663.00$                         5% Fire Sprinkler —Tenant  Improvements
(PLUS Hydraulic Calculation Fee*, if
applicable)
LESS THAN 30 HEADS WITH HYDRO Minor plan check required‐only one inspection 885.04$                                              840.00  100% 885.00$                         5% Fire Sprinkler —Tenant  Improvements
(PLUS Hydraulic Calculation Fee*, if
applicable)
30‐100 Heads per floor or
system 1,659.44$                                       1,582.00  100% 1,659.00$                     5% Fire Sprinkler —Tenant  Improvements
(PLUS Hydraulic Calculation Fee*, if
applicable)
101‐200 Heads per floor or
system 2,101.96$                                       2,004.00  100% 2,101.00$                     5% Fire Sprinkler —Tenant  Improvements
(PLUS Hydraulic Calculation Fee*, if
applicable)
201‐350 Heads per floor or
system 2,433.85$                                       2,320.00  100% 2,433.00$                     5% Fire Sprinkler —Tenant  Improvements
(PLUS Hydraulic Calculation Fee*, if
applicable)
351+ Heads per floor or
system 2,986.99$                                       2,847.00  100% 2,986.00$                     5% TRACT REVIEW – Fire Sprinkler Master Plan
Check PLUS Hydraulic Calculation Fee*   Duplicate TRACT Plan Check: 13D SYSTEM (SFD/TOWNHOUSE)
per floor or
system 885.04$                                              840.00  100% 885.00$                         5% TRACT REVIEW – Fire Sprinkler Master Plan
Check PLUS Hydraulic Calculation Fee*   Duplicate TRACT Plan Check: 13   SYSTEM (BUILDING)
per floor or
system  200 Heads and Below 1,106.29$                                       1,050.00  100% 1,106.00$                     5% TRACT REVIEW – Fire Sprinkler Master Plan
Check PLUS Hydraulic Calculation Fee*   Duplicate TRACT Plan Check: 13   SYSTEM (BUILDING)
per floor or
system  201 – 350  Heads 1,327.55$                                       1,260.00  100% 1,327.00$                     5% TRACT REVIEW – Fire Sprinkler Master Plan
Check PLUS Hydraulic Calculation Fee*   Duplicate TRACT Plan Check: 13   SYSTEM (BUILDING)
per floor or
system  351+ Heads 1,548.81$
1,470.00  100% 1,548.00$                     5%
Additional Fire Sprinkler Review Items   Hydraulic Calculation* per remote area 885.04$                                              843.00  100% 885.00$                         5% Additional Fire Sprinkler Review Items   Antifreeze System per system 1,659.44$                                    1,582.00  100% 1,659.00$                   5% Additional Fire Sprinkler Review Items   Dry Pipe Valve per valve 1,770.07$                                    1,687.00  100% 1,770.00$                   5% Additional Fire Sprinkler Review Items   Deluge/Pre Action per valve 2,101.96$                                    2,004.00  100% 2,101.00$                   5% Additional Fire Sprinkler Review Items   Pressure Reducing Station per valve 2,433.85$                                    2,320.00  100% 2,433.00$                   5% Fire Pump per pump 2,876.37$                                    2,742.00  100% 2,876.00$                   5% Water Storage Tank: Gravity
per tank 1,659.44$                                    1,582.00  100% 1,659.00$                   5% Water Storage Tank: Pressure per tank 1,659.44$                                    1,582.00  100% 1,659.00$                   5% Fire Standpipe System   Class I, II, III & Article 81  per standpipe 1,991.33$                                       1,898.00  100% 1,991.00$                     5% Fire Alarm System ‐New   0‐15 Devices per system All Initiating and indicating appliances, including Dampers 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Fire Alarm System ‐New   16‐50 Devices per system 1,548.81$                                    1,476.00  100% 1,548.00$                   5% Fire Alarm System ‐New   51‐100 Devices per system 1,991.33$                                    1,898.00  100% 1,991.00$                   5% Fire Alarm System ‐New   101‐500 Devices per system 2,433.85$                                    2,320.00  100% 2,433.00$                   5% Fire Alarm System ‐New   Each additional 25 devices up to 1,000 per system 1,106.29$                                    1,054.00  100% 1,106.00$                   5% Fire Alarm System ‐New   1001+ per system 4,425.18$                                    4,219.00  100% 4,425.00$                   5% 42 Fire Prevention
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Fire Alarm System ‐New   Each additional 100 devices per system 2,212.59$                                    2,109.00  100% 2,212.00$                   5% Existing system under 8 devices 663.78$                                           630.00  100% 663.00$                       5% Additional Fire Alarm Review Items   Hi/Lo Alarms each 1,216.92$                                    1,160.00  100% 1,216.00$                   5% Additional Fire Alarm Review Items   Low Air/Temp Alarms each 1,216.92$                                    1,160.00  100% 1,216.00$                   5% Additional Fire Alarm Review Items   Graphic Annunciator Review each 1,216.92$                                    1,160.00  100% 1,216.00$                   5% Hazardous Activities or Uses   Installation Permits: Clean Agent Gas Systems each 1,216.92$                                       1,160.00  100% 1,216.00$                     5% Hazardous Activities or Uses   Installation Permits: Dry Chemical Systems each 1,216.92$                                       1,160.00  100% 1,216.00$                     5% Hazardous Activities or Uses   Installation Permits: Wet Chemical/Kitchen Hood each 1,216.92$                                       1,160.00  100% 1,216.00$                     5% Hazardous Activities or Uses   Installation Permits: Foam Systems each 1,216.92$                                    1,160.00  100% 1,216.00$                   5% Hazardous Activities or Uses   Installation Permits: Paint Spray Booth each 1,216.92$                                    1,160.00  100% 1,216.00$                   5% Hazardous Activities or Uses   Installation Permits: Vehicle Access Gate each 553.15$                                              526.00  100% 553.00$                         5% Hazardous Activities or Uses   Installation Permits: Monitoring each 663.78$                                           632.00  100% 663.00$                       5% Hazardous Activities or Uses
Installation Permits:

Aboveground—Flammable/Combustible
Liquid Tank and/or Pipe
per site 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Hazardous Activities or Uses
Installation Permits:

Underground—Flammable/Combustible
Liquid Tank and/or Pipe
per site 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Hazardous Activities or Uses   Installation Permits: Fuel Dispensing System Complete per site 1,216.92$                                       1,160.00  100% 1,216.00$                     5% Hazardous Activities or Uses   Installation Permits: High Piled/Rack/Shelf Storage each 1,438.18$                                       1,371.00  100% 1,438.00$                     5% Hazardous Activities or Uses   Installation Permits: Smoke Control CFC each 1,438.18$                                    1,371.00  100% 1,438.00$                   5% Hazardous Activities or Uses   Installation Permits: Medical Gas Alarms per  system 1,216.92$                                       1,160.00  100% 1,216.00$                     5% Hazardous Activities or Uses   Installation Permits: Refrigerant System each 1,106.29$                                    1,054.00  100% 1,106.00$                   5% Hazardous Activities or Uses   Installation Permits: Refrigerant Monitoring System each 1,216.92$                                       1,160.00  100% 1,216.00$                     5% AMMR Review each 663.78$                                           632.00  100% 663.00$                       5% Activity Permits (Single Event/One‐Time)   Open Flames and Candles (105.6.32) per permit 885.04$                                              843.00  100% 885.00$                         5% Activity Permits (Single Event/One‐Time)   Carnivals and Fairs (105.6.4) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Seasonal Lots (Christmas Tree/Pumpkin Lot) per permit 221.26$                                              210.00  100% 221.00$                         5% Activity Permits (Single Event/One‐Time)   Special Events (Haunted House/Camps) per  permit 221.26$                                              210.00  100% 221.00$                         5% Activity Permits (Single Event/One‐Time)   Explosives (105.6.14) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Fireworks; Displays (105.6.14) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Hot‐Works Operations (105.6.23) per permit 885.04$                                              843.00  100% 885.00$                         5% Activity Permits (Single Event/One‐Time)   LP‐Gas (105.6.27) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)
Liquid or Gas‐Fueled Vehicles or
Equipment in Assembly Buildings
(105.6.26)
per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Covered Mall Buildings (105.6.9) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Open Burning (105.6.30) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Pyrotechnical Special Effects Material (105.6.36) per permit 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Activity Permits (Single Event/One‐Time)   Small Tent Structure ( 750 Sq. Ft. or less) per permit 553.15$                                              526.00  95% 526.00$                         0% 43 Fire Prevention
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Activity Permits (Single Event/One‐Time)   Large Tent Structure (751 Sq. Ft. or above) per permit  663.78$                                              647.00  97% 647.00$                         0% Activity Permits (Single Event/One‐Time)   Fire Safety Inspections   per application 885.04$                                              843.00  100% 885.00$                         5% Activity Permits (Single Event/One‐Time)   Non‐Compliance Inspections per inspection 885.04$                                              843.00  100% 885.00$                         5% Activity Permits (Single Event/One‐Time)   Outside Agency  per inspection 885.04$                                              843.00  100% 885.00$                         5% Annual State‐Mandated Pre‐Inspections   6 or less Occupants per facility 774.41$                                                50.00  6% 50.00$                           0% Annual State‐Mandated Pre‐Inspections   7 or more Occupants per facility 885.04$                                              100.00  11% 100.00$                         0% Annual State‐Mandated   Apartments    per facility 885.04$                                              843.00  100% 885.00$                         5% Annual State‐Mandated Apartments: More than 100 Units per facility 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Annual State‐Mandated 24 Hour Community Care
Facilities 7 to 49 per facility 829.72$                                              791.00  100% 829.00$                         5% Annual State‐Mandated 24 Hour Community Care
Facilities 50 or More per facility 885.04$                                              843.00  100% 885.00$                         5% Annual State‐Mandated Day Care Centers Residential 9‐14 per facility 221.26$                                           384.00  100% 221.00$                       ‐42% Annual State‐Mandated Day Care Centers Commercial 15+ per facility 442.52$                                           436.00  100% 442.00$                       1% Annual State‐Mandated   High Rise Building per facility 1,327.55$                                    1,265.00  100% 1,327.00$                   5% Annual State‐Mandated   Homes for the Mentally Impaired (7 or more Occupants) per facility 885.04$                                              843.00  100% 885.00$                         5% Annual State‐Mandated   Hospital and Jail  per facility 1,991.33$                                    1,898.00  100% 1,991.00$                   5% Annual State‐Mandated   Hotels/Motels per facility 885.04$                                           843.00  100% 885.00$                       5% Annual State‐Mandated   School per facility 995.66$                                           949.00  100% 995.00$                       5% Reports   Life Safety Report   per report $0.10  each additional page of same document Variable $0.50/page for first
ten (10) pages of each
document
100% .5 first ten, .10
thereafter  NA
Reports   Life Safety Report Photographs
per
photograph
set
Variable Direct cost of
Duplication  100% Direct cost of
Duplication  NA
Reports   Subpoenaed Reports    per report
$0.10 each additional page of same document Variable
$0.50/page for first
ten (10) pages of each
document
100% .5 first ten, .10
thereafter  NA
Other Fire Fees   Technology Fee
per permit NA                              17.00  NA 17.00$                         0% Other Fire Fees   Underground Fire Service Plan Check each 1,991.33$                                    1,898.00  100% 1,991.00$                   5% Other Fire Fees   Emergency Underground Repair  each 663.78$                                           630.00  100% 663.00$                       5% Other Fire Fees   Hydrant Flow Test (existing Hydrants) each 774.41$                                           738.00  100% 774.00$                       5% Other Fire Fees   Fire Plans Examiner Miscellaneous each 331.89$                                           316.00  100% 331.00$                       5% Other Fire Fees   Re‐Inspection Fee per hour 387.20$                                           369.00  100% 387.00$                       5% Other Fire Fees   False Alarm Response * per billed
incident 995.66$                                              949.00  100% 995.00$                         5% Other Fire Fees   Fire Hydrants per hydrant 221.26$                                           210.00  100% 221.00$                       5% Other Fire Fees
Re‐roofing Permits /Siding/Windows
(Applicable only in Wildland/Urban
Interface)
per
application 110.63$                                              105.00  100% 110.00$                         5% Other Fire Fees   Fire Permit Extension Fee per 6‐month extension 110.63$                                              105.00  100% 110.00$                         5% Pre‐Application/General Plan Review/Code
Assistance  per meeting 885.04$                                              843.00  100% 885.00$                         5% Self Inspection Program  per facility 1,106.29$                                    1,054.00  100% 1,106.00$                   5% Planning/Engineering Referrals (HWD) per
a
pplication 885.04$                                              843.00  100% 885.00$                         5% Business License Reviews each 774.41$                                           738.00  100% 774.00$                       5% Fairview Planning Referrals  each 331.89$                                           316.00  100% 331.00$                       5% Fairview New Construction per
a
pplication 995.66$                                              949.00  100% 995.00$                         5% Annual Permits   Aerosol Products (105.6.1) per year 1,106.29$                                    1,054.00  100% 1,106.00$                   5% 44 Fire Prevention
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Annual Permits   Amusement Buildings (105.6.2) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Aviation Facilities (105.6.3) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Carnivals and Fairs (105.6.4) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Cellulose Nitrate Film (105.6.5) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Combustible Dust‐Producing Operations
(105.6.6) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Combustible Fibers (105.6.7) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Compressed Gases (105.6.8) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Covered Mall Buildings (105.6.9) per year 2,433.85$                                    2,300.00  100% 2,433.00$                   6% Annual Permits   Cryogenic Fluids (105.6.10) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Cutting and Welding (105.6.11)
per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Dry Cleaning Plants (105.6.12) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Exhibits and Trade Shows (105.6.13) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Explosives (105.6.14) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Fire Hydrants and Valves (105.6.15) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Flammable and Combustible Liquids
(105.6.16) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Floor Finishing (105.6.17) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Fruit and Crop Ripening (105.6.18) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Fumigation or Thermal Insecticide Fogging (105.6.19) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Hazardous Materials (105.6.20) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   HPM facilities (105.6.21) per year 1,106.29$                                    1,054.00  100% 1,106.00$                   5% Annual Permits   High‐Piled Storage < 12000 SF (105.6.22) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   High‐Piled Storage > 12000 SF (105.6.22) per year 1,106.29$                                       1,054.00  100% 1,106.00$                     5% Annual Permits   Hot‐Works Operations (105.6.23) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Industrial Ovens (105.6.24) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Lumber Yards and WoodWorking Plants
(105.6.25) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits
Liquid or Gas‐Fueled Vehicles or
Equipment in Assembly Buildings
(105.6.26)
per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   LP‐Gas (105.6.27) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Magnesium (105.6.28) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Miscellaneous Combustible Storage
(105.6.29) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Open Burning (105.6.30) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Open Flames and Torches (105.6.31) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Open Flames and Candles (105.6.32) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Organic Coatings (105.6.33) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Places of Assembly < 300 (105.6.34)
per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Places of Assembly > 300 (105.6.34) per year 1,106.29$                                    1,054.00  100% 1,106.00$                   5% Annual Permits   Private Fire Hydrants (105.6.35) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Pyrotechnical Special Effects Material (105.6.36) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Pyroxylin Plastics (105.6.37) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Refrigeration Equipment (105.6.38) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Repair Garages and Motor Fuel‐Dispensing Facilities (105.6.39) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Rooftop Heliports (105.6.40) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Spraying or Dipping (105.6.41) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Storage of Scrap Tires and Tire Byproducts (105.6.42) per year 885.04$                                              843.00  100% 885.00$                         5% Annual Permits   Tire‐Rebuilding Plants  (105.6.44) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Waste Handling (105.6.45) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Wood Products (105.6.46) per year 885.04$                                           843.00  100% 885.00$                       5% Annual Permits   Essential City Facilities per year 885.04$                                           843.00  100% 885.00$                       5% Fire Department Miscellaneous Fees:

Building Permits    Minor Tenant Improvement per permit 663.78$                                              630.00  100% 663.00$                         5% 45 Fire Prevention
Fee Group Title Sub Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Percent
Change
Fire Department Miscellaneous Fees:

Building Permits   Revision‐minor changes to (E) permit per  permit 331.89$                                              316.00  100% 331.00$                         5% Fire Department Miscellaneous Fees:

Building Permits   Cellular  Sites: Existing Site per permit 663.78$                                              630.00  100% 663.00$                         5% Fire Department Miscellaneous Fees:

Building Permits   Cellular  Sites: New Site          per square footage Variable  SEE CHART   100% Variable NA
Fire Department Miscellaneous Fees:

Building Permits   Equipment Installations  per permit 663.78$                                              630.00  100% 663.00$                         5% Fire Department Miscellaneous Fees:

Building Permits   HVAC/air units If over 2,000 cfm per permit 221.26$                                              210.00  100% 221.00$                         5% New Construction Permits and Fees New  Construction Variable NA  100% 35% NA 46 Hazardous Materials
Fee Group Title Sub Title Unit Notes
Full Cost per
Inspt/Project
Avg Annual Cost
per Inspt* Current  Fee
Cost Recovery
Level (%) Suggested Fee
Percent
Change
Hazardous Materials Storage Permit 1A:  Storage of one (1) or more types Solid  up to 500 lbs (pounds) per year Municipal  Code, Chapter 3, Article 8 702.13$                 234.04$                                              245.00  100% 234.00$                              ‐4% Hazardous Materials Storage Permit 1A:  Storage of one (1) or more types Liquid up to 55 gallons per year Municipal  Code, Chapter 3, Article 8 702.13$                 234.04$                                              245.00  100% 234.00$                              ‐4% Hazardous Materials Storage Permit 1A:  Storage of one (1) or more types Gaseous up  to 2,000 cubic feet at STP per year Municipal  Code, Chapter 3, Article 8 702.13$                 234.04$                                              245.00  100% 234.00$                               ‐4% Hazardous Materials Storage Permit 2A:  Storage of one (1) or more types Solid  between 500 & 5,000 lbs per year Municipal  Code, Chapter 3, Article 8 743.43$                 247.81$                                              279.00  100% 247.00$                              ‐11% Hazardous Materials Storage Permit 2A:  Storage of one (1) or more types Liquid  between 55 & 550 gallons per  year Municipal  Code, Chapter 3, Article 8 743.43$                  247.81$                                              279.00  100% 247.00$                              ‐11% Hazardous Materials Storage Permit 2A:  Storage of one (1) or more types Gaseous between 200 & 2,000 cubic feet at STP per year Municipal  Code, Chapter 3, Article 8 743.43$                 247.81$                                              279.00  100% 247.00$                              ‐11% Hazardous Materials Storage Permit 3A:  Storage of one (1) to five 5) types Solid between 5,000 & 25,000 lbs per  year Municipal  Code, Chapter 3, Article 8 784.73$                 261.58$                                              346.00  100% 261.00$                              ‐25% Hazardous Materials Storage Permit 3A:  Storage of one (1) to five 5) types Liquid  between 550 & 2,750 gallons per  year Municipal  Code, Chapter 3, Article 8 784.73$                 261.58$                                              346.00  100% 261.00$                              ‐25% Hazardous Materials Storage Permit 3A: Storage of one (1) to five 5) types Gaseous between 2,000 & 10,000 cubic feet at STP per year Municipal  Code, Chapter 3, Article 8 784.73$                 261.58$                                              346.00  100% 261.00$                              ‐25% Hazardous Materials Storage Permit 3B:  Storage of six (6) or more types Solid  between 5,000 & 25,000 lbs per  year Municipal  Code, Chapter 3, Article 8 867.33$                  289.11$                                              380.00  100% 289.00$                              ‐24% Hazardous Materials Storage Permit 3B:  Storage of six (6) or more types Liquid  between 550 & 2,750 gallons per  year Municipal  Code, Chapter 3, Article 8 867.33$                 289.11$                                              380.00  100% 289.00$                              ‐24% Hazardous Materials Storage Permit 3B:  Storage of six (6) or more types Gaseous between 2,000 & 10,000 cubic feet at STP per year Municipal Code, Chapter 3, Article 8 867.33$                 289.11$                                              380.00  100% 289.00$                              ‐24% Hazardous Materials Storage Permit 4A: Storage of one (1) to five (5) types Solid between 25,000 & 50,000 lbs per  year Municipal  Code, Chapter 3, Article 8 908.64$                 302.88$                                              397.00  100% 302.00$                              ‐24% Hazardous Materials Storage Permit 4A: Storage of one (1) to five (5) types Liquid between 2,750 & 5,000 gallons per  year Municipal  Code, Chapter 3, Article 8 908.64$                 302.88$                                              397.00  100% 302.00$                              ‐24% Hazardous Materials Storage Permit 4A: Storage of one (1) to five (5) types
Gaseous between 10,000 & 20,000 cubic
feet at STP per year Municipal  Code, Chapter 3, Article 8 908.64$                 302.88$                                              397.00  100% 302.00$                              ‐24% Hazardous Materials Storage Permit 4B:  Storage of six (6) or more types Solid  between 25,000 & 50,000 lbs per  year Municipal  Code, Chapter 3, Article 8 949.94$                 316.65$                                              414.00  100% 316.00$                              ‐24% Hazardous Materials Storage Permit
4B: Storage of six (6) or more types Liquid  between 2,750 & 5,000 gallons per  year Municipal  Code, Chapter 3, Article 8 949.94$                 316.65$                                              414.00  100% 316.00$                              ‐24% Hazardous Materials Storage Permit 4B:  Storage of six (6) or more types Gaseous between 10,000 & 20,000 cubic feet at STP per year Municipal  Code, Chapter 3, Article 8 949.94$                  316.65$                                              414.00  100% 316.00$                              ‐24% Hazardous Materials Storage Permit 5A: Storage of one (1) to five (5) types Solid 50,000 pounds or more per year Municipal  Code, Chapter 3, Article 8 1,073.84$             357.95$                                              448.00  100% 357.00$                              ‐20% Hazardous Materials Storage Permit 5A: Storage of one (1) to five (5) types Liquid 5,000 gallons or more per year Municipal  Code, Chapter 3, Article 8 1,073.84$             357.95$                                              448.00  100% 357.00$                              ‐20% Hazardous Materials Storage Permit 5A: Storage of one (1) to five (5) types Gaseous 20,000 cu. ft. or more at STP per year Municipal  Code, Chapter 3, Article 8 1,073.84$             357.95$                                              448.00  100% 357.00$                              ‐20% Hazardous Materials Storage Permit 5B: Storage of six (6) to ten (10) types Solid 50,000 pounds or more per year Municipal  Code, Chapter 3, Article 8 1,197.75$             399.25$                                              482.00  100% 399.00$                              ‐17% Hazardous Materials Storage Permit 5B: Storage of six (6) to ten (10) types Liquid 5,000 gallons or more per year Municipal  Code, Chapter 3, Article 8 1,197.75$             399.25$                                              482.00  100% 399.00$                              ‐17% Hazardous Materials Storage Permit 5B: Storage of six (6) to ten (10) types Gaseous 20,000 cu. ft. or more at STP per year Municipal  Code, Chapter 3, Article 8 1,197.75$             399.25$                                              482.00  100% 399.00$                              ‐17% Hazardous Materials Storage Permit 5C: Storage of eleven (11) or more types  Solid 50,000 pounds or more per year Municipal  Code, Chapter 3, Article 8 1,239.05$             413.02$                                              516.00  100% 413.00$                              ‐20% Hazardous Materials Storage Permit 5C: Storage of eleven (11) or more types  Liquid 5,000 gallons or more per year Municipal  Code, Chapter 3, Article 8 1,239.05$             413.02$                                              516.00  100% 413.00$                              ‐20% Hazardous Materials Storage Permit 5C: Storage of eleven (11) or more types  Gaseous 20,000 cu. ft. or more at STP per year Municipal  Code, Chapter 3, Article 8 1,239.05$             413.02$                                              516.00  100% 413.00$                              ‐20% Other CUPA Program Elements Annual State Surcharges CUPA Program Oversight per facility Set by State NA N/A                                24.00  NA 24.00$                                0% Other CUPA Program Elements Annual State Surcharges Underground Storage Tanks (UST) Program per  UST Set by State NA N/A                                 15.00  NA 15.00$                                 0% Other CUPA Program Elements Annual State Surcharges CalARP Program per site Set by State NA N/A                             270.00  NA 270.00$                             0% Other CUPA Program Elements Annual State Surcharges California Electronic Reporting System (CERS) per facility Set  by State NA N/A                                 25.00  NA 25.00$                                 0% Other CUPA Program Elements Hazardous Waste Generator Program Up to 27 gallons; 220 lbs generated per month per year 536.92$                 178.97$                                              183.00  100% 178.00$                              ‐3% 47 Hazardous Materials
Fee Group Title Sub Title Unit Notes
Full Cost per
Inspt/Project
Avg Annual Cost
per Inspt* Current  Fee
Cost Recovery
Level (%) Suggested Fee
Percent
Change
Other CUPA Program Elements Hazardous Waste Generator Program 28 to 270 gallons; 221 to 2,220 lbs per month per year 991.24$                 330.41$                                              206.00  100% 330.00$                              60% Other CUPA Program Elements Hazardous Waste Generator Program 271 gallons or more; 2,221 lbs or more per month per year 1,321.65$             440.55$                                              313.00  100% 440.00$                              41% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program Permit by Rule (Fixed Units) per facility per year 1,321.65$             440.55$                                              282.00  100% 440.00$                              56% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program Permit by Rule (Transportable units) per facility per year 1,321.65$             440.55$                                              282.00  100% 440.00$                              56% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program Conditional Authorization per facility per year 743.43$                 247.81$                                              248.00  100% 247.00$                              0% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program Conditional Exemption, Specified Waste per facility per year 660.83$                 220.28$                                              214.00  100% 220.00$                              3% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program
Conditional Exemption, Small Quantity
Treatment
per facility per
year 660.83$                 220.28$                                              214.00  100% 220.00$                              3% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program
Conditional Exemption, Commercial
Laundry
per facility per
year 660.83$                 220.28$                                              214.00  100% 220.00$                              3% Other CUPA Program Elements Hazardous Waste Treatment (Tiered Permit) Program Conditional Exemption, Limited per facility per year 660.83$                 220.28$                                              214.00  100% 220.00$                              3% Other CUPA Program Elements   Hazardous Materials Business Plan (HMBP) per facility per year 743.43$                 247.81$                                              206.00  100% 247.00$                              20% Other CUPA Program Elements   Underground Storage Tank (UST) Program for 1st UST per year 1,239.05$             1,239.05$                                           656.00  100% 1,239.00$                           89% Other CUPA Program Elements   Underground Storage Tank (UST) Program per addn'l UST per year 536.92$                 536.92$                                              142.00  100% 536.00$                              277% Other CUPA Program Elements California Accidental Release Prevention (CalARP) Program
Aboveground Petroleum Storage Act
Program ‐ Spill Prevention Control and
Countermeasure Plan
per facility per
year 908.64$                 302.88$                                              233.00  100% 302.00$                              30% Other CUPA Program Elements California Accidental Release Prevention (CalARP) Program Small CalARP facility per facility per year 2,560.70$             2,560.70$                                        1,244.00  100% 2,560.00$                           106% Other CUPA Program Elements California Accidental Release Prevention (CalARP) Program Large CalARP facility per facility per year 2,643.31$             2,643.31$                                        2,490.00  100% 2,643.00$                           6% New Construction Permits and Fees New  Construction Large, Tenant Improvement – New Facility ‐$                         Valuation Based                            3,969.00  100%  Valuation Based  NA New Construction Permits and Fees New  Construction Medium, Tenant Improvement – New Facility ‐$                         Valuation Based                            2,605.00  100%  Valuation Based  NA New Construction Permits and Fees New  Construction Small, Tenant Improvement – New Facility ‐$                         Valuation Based                            1,319.00  100%  Valuation Based  NA New Construction Permits and Fees New Facility – No Construction Medium  to Large 1,982.48$                                      1,601.00  100% 1,982.00$                          24% New Construction Permits and Fees New Facility – No Construction Small 991.24$                                            776.00  100% 991.00$                             28% New Construction Permits and Fees Underground Storage Tank System Installation  ‐ VPH 4,171.47$                                      3,433.00  100% 4,171.00$                          21% New Construction Permits and Fees Underground Storage Tank Piping  Installation 1,445.56$                                      1,191.00  100% 1,445.00$                          21% New Construction Permits and Fees Underground Storage Tank Piping  Installation ‐ VPH 1,775.97$             New  100% 1,775.00$                          NA New Construction Permits and Fees Underground Storage Tank UDC/Sump  Installation 1,445.56$                                      1,191.00  100% 1,445.00$                          21% New Construction Permits and Fees Underground Storage Tank UDC/Sump  Installation ‐ VPH 1,775.97$             New  100% 1,775.00$                          NA New Construction Permits and Fees Underground Storage Tank System Removal 1,817.27$                                      1,480.00  100% 1,817.00$                          23% New Construction Permits and Fees Underground Storage Tank Piping  Removal 1,156.45$                                         957.00  100% 1,156.00$                          21% New Construction Permits and Fees Underground Storage Tank UDC/Sump  Removal 1,156.45$                                         957.00  100% 1,156.00$                          21% New Construction Permits and Fees Underground Storage Tank EVR  Phase I Installation or Upgrade 660.83$                                            542.00  100% 660.00$                             22% New Construction Permits and Fees Underground Storage Tank EVR  Phase II Installation or Upgrade 1,197.75$                                         989.00  100% 1,197.00$                          21% New Construction Permits and Fees Underground Storage Tank Monitoring  System Installation or Upgrade 1,073.84$                                          889.00  100% 1,073.00$                           21% New Construction Permits and Fees Underground Storage Tank System Tank/Piping  Repair 1,899.88$                                      1,598.00  100% 1,899.00$                          19% New Construction Permits and Fees Underground Storage Tank System Tank/Piping  Repair ‐ VPH 2,230.29$             New  100% 2,230.00$                          NA New Construction Permits and Fees Underground Storage Tank System Miscellaneous Component Repair ‐ Major 1,899.88$                                       1,598.00  100% 1,899.00$                           19% New Construction Permits and Fees Underground Storage Tank System Miscellaneous Component Repair ‐ Major ‐ VPH 2,230.29$                                       1,882.00  100% 2,230.00$                           18% New Construction Permits and Fees Underground Storage Tank System Miscellaneous Component Repair ‐ Minor 784.73$                                              656.00  100% 784.00$                              20% New Construction Permits and Fees Underground Storage Tank System Miscellaneous Component Repair ‐ Minor ‐ VPH 1,115.14$                                          940.00  100% 1,115.00$                           19% New Construction Permits and Fees Underground Storage Tank Temporary Closure 1,486.86$                                      1,256.00  100% 1,486.00$                          18% New Construction Permits and Fees Aboveground Storage Tanks System Installation 1,239.05$                                      1,064.00  100% 1,239.00$                          16% 48 Hazardous Materials
Fee Group Title Sub Title Unit Notes
Full Cost per
Inspt/Project
Avg Annual Cost
per Inspt* Current  Fee
Cost Recovery
Level (%) Suggested Fee
Percent
Change
New Construction Permits and Fees Aboveground Storage Tanks System Removal 1,073.84$                                         915.00  100% 1,073.00$                          17% New Construction Permits and Fees Aboveground Storage Tanks System Repair or Modification 949.94$                                            793.00  100% 949.00$                             20% New Construction Permits and Fees California Accidental Release Prevention (CalARP) Program Large‐ Risk Management Plan Review  7,103.88$                                       6,692.00  100% 7,103.00$                           6% New Construction Permits and Fees California Accidental Release Prevention (CalARP) Program Small‐ Risk Management Plan Review 4,460.58$                                       4,202.00  100% 4,460.00$                           6% New Construction Permits and Fees California Accidental Release Prevention (CalARP) Program
Other costs incurred, including but not
limited to third‐party review, laboratory
work, public notice, communication and
correspondence
165.21$                                              142.00  100% 165.00$                              16% New Construction Permits and Fees Meetings Code Assistance Meeting 413.02$                                            348.00  100% 413.00$                             19% New Construction Permits and Fees Meetings Pre‐Application Meeting 330.41$                                            281.00  100% 330.00$                             17% New Construction Permits and Fees Request for Alternate Means of Protection (AMP) Review 660.83$                                              232.00  100% 660.00$                              184% Miscelaneous Facility  Closure 3A and above – full facility closure 1,817.27$                                      1,520.00  100% 1,817.00$                          20% Miscelaneous Facility  Closure 3A and above – partial facility closure 1,032.54$                                         860.00  100% 1,032.00$                          20% Miscelaneous Facility  Closure Below 3A – full facility closure 619.52$                                            521.00  100% 619.00$                             19% Miscelaneous Facility  Closure Below 3A – partial facility closure 413.02$                                            346.00  100% 413.00$                             19% Miscelaneous Contamination Staff  Oversight per hour 165.21$                                            142.00  100% 165.00$                             16% Miscelaneous Sire  Clearance New construction/use – large 413.02$                                            386.00  100% 413.00$                             7% Miscelaneous Sire Clearance New construction/use – small 247.81$                                            230.00  100% 247.00$                             7% Miscelaneous Sire Clearance Property transfer – large 413.02$                                            386.00  100% 413.00$                             7% Miscelaneous Sire  Clearance Property transfer – small 247.81$                                            230.00  100% 247.00$                             7% Miscelaneous Other Inspections and  Compliance
Verification Re‐inspection (CUPA and non‐CUPA) per  hour 165.21$                                              142.00  100% 165.00$                              16% Miscelaneous Other Inspections and  Compliance
Verification Re‐inspection beyond allowed by permit per  inspection 330.41$                                              270.00  100% 330.00$                              22% Miscelaneous Other Inspections and  Compliance
Verification After‐hours inspection per hour 247.81$                                              214.00  100% 247.00$                               15% Miscelaneous Other Inspections and  Compliance
Verification Miscellaneous Inspections and Activities per hour 165.21$                                              142.00  100% 165.00$                              16% Miscelaneous Other Inspections and  Compliance
Verification Compliance verification per notice 82.60$                                                   72.00  100% 82.00$                                 14% Miscelaneous California Environmental Reporting
System Assitance Fee per hour 165.21$                                              142.00  100% 165.00$                              16% Miscelaneous California Environmental Reporting
System Assitance Fee (after hours) per hour 247.81$                                              214.00  100% 247.00$                              15% Miscelaneous Plan Checking Review Fee per hour 165.21$                                            142.00  100% 165.00$                             16% Miscelaneous Plan Checking Checking Fee per hour 165.21$                                            142.00  100% 165.00$                             16% Miscelaneous Plan Checking Expedited Plan Checking Fee per hour 247.81$                                            214.00  100% 247.00$                             15% *All elements of permitted facilities are inspected once every three (3) years, with the exception of the UST and CalARP elements, which is why the full cost of the inspection must be divided by three (3) for all the other elements in order to get the annual cost of inspection 49 Technology Services
Title Sub Title Unit Notes Full  Cost  Current Fee
Cost Recovery
Level (%) Suggested Fee
Video Technician Video  Services including editing and duplication Per hour, per technician 98.47$                          75.00  100% 98.00$ GIS Map Fee plus
materials 76.49$                Variable  100% 76.00$
50 Library and Community Services
Title Sub Title Unit Notes Full Cost  Current Fee
Cost Recovery
Level (%) Suggested Fee
Percent
Change
Overdue Fines Print material, videotapes and sound recordings per day maximum ‐ cost of item NA                                              0.25 NA 0.25$                                        0% Overdue Fines DVD’s per day maximum ‐ cost of item NA                                              0.25 NA 0.25$                                        0% Overdue Fines Reference materials (return within 7 days) per day maximum ‐ cost of item NA                                              3.00 NA 3.00$                                        0% Overdue Fines Billing Fee – reference materials (returns after 7 days)  NA                                            75.00 NA 75.00$                                      0% Overdue Fines Billing Fee – all others NA                                            20.00 NA 20.00$                                      0% Overdue Fines Fine Limit (non‐returns) Variable
Original cost of item plus
Billing and Processing Fees  NA
Original cost of item plus
Billing and Processing Fees  NA
Replacement of Lost/Damaged Pamphlet (includes $0.50 for Barcode Replacement) 2.00$                                                              2.00 100% 2.00$                                        0% Replacement of Lost/Damaged Audio/Visual Case Multiple  Cassettes/CD/DVD Cases 9.00$                                                              9.00 100% 9.00$                                        0% Replacement of Lost/Damaged Audio/Visual Case Cassette  Bags 3.00$                                                              3.00 100% 3.00$                                        0% Replacement of Lost/Damaged Audio/Visual Case Single  Compact Disc and DVD Cases 3.00$                                                              3.00 100% 3.00$                                        0% Replacement of Lost/Damaged Audio/Visual Case Video  Cassette Cases 4.00$                                                              4.00 100% 4.00$                                        0% Replacement of Lost/Damaged Audio/Visual Case Video  Booklet 3.00$                                                              3.00 100% 3.00$                                        0% Inter‐Library Loan (+ any charges imposed by the lending library) 5.34$                                                              5.00 100% 5.00$                                        0% Processing fee for lost item  (in addition to original cost of item) 26.71$                                                              6.00 22% 6.00$                                        0% Replacement of lost library card (borrower's card) 2.00$                                                              2.00 100% 2.00$                                        0% Replacement lost/damaged bar codes 1.00$                                                              1.00 100% 1.00$                                        0% Teacher Loan Box (includes $0.50 for Barcode Replacement) NA                                            10.00 100% 10.00$                                      0% Mailing of library materials Cost of mailing Variable Cost of mailing  100% Cost of mailing NA “Fines‐Free” Library Loan Program Membership Fees Extended loan  of up to 3 items at a time  per month NA                                              2.99 NA 2.99$                                        NA “Fines‐Free” Library Loan Program Membership Fees Extended loan  of up to 5 items at a time   per month NA                                              4.99 NA 4.99$                                        NA “Fines‐Free” Library Loan Program Membership Fees Extended loan  of up to 10 items at a time   per month NA                                              8.99 NA 8.99$                                        NA Rental of Equipment Deposit based on cost of equipment Variable New  100% Variable NA 51 Maintenance Services
Title Sub  Title Unit Notes Full  Cost  Current Fee
Cost Recovery
Level (%) Suggested  Fee
Percent
Change
City Hall Rental Rotunda Per  Event Includes  20 tables and 150 chairs NA        675.00  0%  Market Based  NA City Hall Rental Prefunction  Area Per  Event Includes  20 tables and 150 chairs NA        408.00  0%  Market Based  NA City Hall Rental Plaza  – Half Day Rental 4‐Hour Rental NA       470.00  0% Market Based  NA Cit
y Hall Rental Plaza  – Full Day Rental All Day Rental NA       517.00  0% Market Based  NA City Hall Rental Council  Chambers Per Event NA       470.00  0% Market Based  NA City Hall Rental Security  Admin Fee Per Event plus  security contract cost 57.75$                     47.00  100% 57.00$                        21% City Hall Rental Janitorial  Admin Fee Per Event plus  janitorial contract cost 57.75$                     47.00  100% 57. 00$                        21% City Hall Rental Portable  Bar Per Event 76.00$                     76.00  100% 76.00$                        0% City Hall Rental Sound  System Per Event 133.00$                 133.00  100% 133.00$                     0% City Hall Rental Insurance  Admin Fee – Third Party Per  Issuance 86.62$                     54.00  100% 86.00$                        59% City Hall Rental Cleaning  and Damage Deposit Per Event Range from $250 upwards,
depending on size an d  nature of
event
Variable        250.00  NA 250.00$                      0% Equipment Rental Chair  Rental per chair (for  one setup and per day) 3.85$                         3.00  100% 3.00$                          0% Equipment Rental 60"  Round Table (seats 8‐10) per table (for  one setup and per day) 11.55$                       9.00  100% 11.00$                        22% Equipment Rental 24"  Round Table (Bistro) per table (for  one setup and per day) 9. 62$                         8.00  100% 9.00$                          13% Equipment Rental 8  Foot Long Table per table (for  one setup and per day) 9.62$                         8.00  100% 9.00$                          13% Equipment Rental 8  Foot Long Class Room Table per table (for  one setup and per day) 9.62$                         8.00  100% 9.00$                          13% Equipment Rental Indoor  Dance Floor (12' x 12') (setup and take‐down fee) 259.87$                 240. 00  100% 259.00$                     8% Equipment Rental Table  Linen: White ‐ Round (setup, take‐down, laundry, and replacement/damage) 11.55$                         9.00  100% 11.00$                         22% Equipment Rental Table Linen: White ‐ Small Round Cocktail Tables
(setup, take‐down, laundry, and
replacement/damage) 11.55$                         9.00  100% 11.00$                         22% Equipment Rental Table  Linen: White ‐ Square (setup, take‐down, laundry, and replacement/damage) 11.55$                         9.00  100% 11.00$                         22% Equipment Rental Table  Linen: Banquet Drapes (5ft) (setup, take‐down, laundry, and replacement/damage) 15.40$                       12.00  100% 15.00$                         25% Equipment Rental Table  Linen: Banquet Drapes (6ft) (setup, take‐down, laundry, and replacement/damage) 17.32$                       12.00  100% 17.00$                         42% Equipment Rental Table  Linen: Banquet Drapes (8ft) (setup, take‐down, laundry, and replacement/damage) 21.17$                       17.00  100% 21.00$                         24% Street Maintenance Cart  retrieval fee 379.16$                   91.00  100% 379.00$                     316% Street Maintenance Sign  Fabricated & Installed by City Crew 566.43$                 317.00  100% 566.00$                     79% Street Maintenance Illegal Dumping on Public Right‐of‐Way ‐ First Violation ‐ Initial Inspection No Penalty 224.28$             No Charge  0% No Charge NA Street Maintenance
Illegal Dumping on Public Right‐of‐Way ‐
First Violation ‐ First Follow‐up inspection
shows violation eliminated
No Penalty 339.78$             No Charge  0% No Charge NA 52 Maintenance Services
Title Sub  Title Unit Notes Full  Cost  Current Fee
Cost Recovery
Level (%) Suggested  Fee
Percent
Change
Street Maintenance
Illegal Dumping on Public Right‐of‐Way ‐
First Follow‐up inspection shows violation
still exists, City abates illegal dumping
plus $100 Penalty 1,181.18$               920.00  100% 1,181.00$                   28% Street Maintenance
Illegal Dumping on Public Right‐of‐Way ‐
Subsequent Violation (within 12
months/same owner) Initial Inspection
No Penalty 224.28$             No Charge  0% No Charge NA Street Maintenance
Illegal Dumping on Public Right‐of‐Way ‐
Subsequent Violation (within 12
months/same owner) First Follow‐up
inspection shows violation eliminated
No Penalty 339.78$             No Charge  0% No Charge NA Street Maintenance
Illegal Dumping on Public Right‐of‐Way ‐
Subsequent Violation (within 12
months/same owner) First Follow‐up
inspection shows violation still exists, City
abates illegal dumping
$800 Penalty 1,181.18$               920.00  100% 1,181.00$                   28% Street Maintenance
Illegal Dumping on Public Right‐of‐Way ‐
Subsequent Violation (within 12
months/same owner) Each subsequent
inspection shows violation still exists
$1000 Penalty 1,181.18$               920.00  100% 1,181.00$                   28% Street Maintenance Illegal Dumping on Public Right‐of‐way ‐ Special Assessment per parcel NA        342.00  NA 342.00$                      0% Special Events per hour 115.50$           New  100% 115.00$                     NA 53 Public Works
Fee Group 1 Fee  Group 2 Fee Group 3 Fee Group 4 Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee Percent  Change
Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage    Aircraft Hangar Waiting List Application Refundable Deposit  NA                   100.00  NA  $                100.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Space   Row "A" T‐Hangars per month  NA                   242.00  NA  $                242.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Space   Standard T‐Hangars per month  NA                   340.00  NA  $                340.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Space   Large T‐Hangars per month  NA                   466.00  NA  $                466.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Space   Exec per  month  NA                   848.00  NA  $                848.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Space   Executive I Hangars per month  NA                1,119.00  NA  $             1,119.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Space   Executive II Hangars per month  NA                1,221.00  NA  $             1,221.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Storage Rooms   Small per  month  NA                     71.00  NA  $                  71.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Storage Rooms   Medium per month  NA                     90.00  NA  $                  90.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Storage Rooms   Large per  month  NA                   174.00  NA  $                174.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Storage Rooms   Extra Large per month  NA                   222.00  NA  $                222.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage Hangar Storage Rooms   Office Spaces per month  NA                   647.00  NA  $                647.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Tie Downs (Aircraft Gross
Weight/Wing Span)   Single Engine per month 3,500 lb.  NA                     60.00  NA  $                  60.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Tie Downs (Aircraft Gross
Weight/Wing Span)   Twin Engine per month 12,500 lb.  less than 50 ft.  NA                     75.00  NA  $                  75.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Tie Downs (Aircraft Gross
Weight/Wing Span)   12,501 ‐ 25,000 lb. more than 50 ft. per month  NA                   108.00  NA  $                108.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Tie Downs (Aircraft Gross
Weight/Wing Span)   25,001 ‐ 75,000 lb. per month  NA                   161.00  NA  $                161.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Tie Downs (Aircraft Gross
Weight/Wing Span)   Excess of 75,000 lbs. per month  NA                   216.00  NA  $                216.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Transient Overnight Tie
Downs (Aircraft Gross
Weight/Wing Span)
Single Engine per month 3,500 lb.  less than 40 ft.  NA                       6.00  NA  $                     6.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Transient Overnight Tie
Downs (Aircraft Gross
Weight/Wing Span)
Twin Engine per month 12,500 lb.  less than 50 ft.  NA                       8.00  NA  $                     8.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Transient Overnight Tie
Downs (Aircraft Gross
Weight/Wing Span)
12,501 ‐ 25,000 lb. more than 50 ft. per month  NA                     12.00  NA  $                  12.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Transient Overnight Tie
Downs (Aircraft Gross
Weight/Wing Span)
25,001 ‐ 75,000 lb. per month  NA                     23.00  NA  $                  23.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Transient Overnight Tie
Downs (Aircraft Gross
Weight/Wing Span)
Excess of 75,000 lbs per month  NA                     29.00  NA  $                  29.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
Transient Overnight Tie
Downs (Aircraft Gross
Weight/Wing Span)
Lighter‐than air Airships per month  NA                     20.00  NA  $                  20.00  0% Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage    Late Charge whichever is greater  NA  $15 or 5% of rent  NA  $15 or 5% of rent  NA
Airport Services Monthly and Daily Fees for Aircraft
Parking and Storage
service of a member firm of the California
Association of Photocopies and Process
Servers
NA                     50.00  NA  $                  50.00  0% Airport Services Permits    Airport Annual Business Permit NA                  120.00  NA $                120.00  0% Airport Services
Permits    Taxiway Access Permit NA                  786.00  NA $                786.00  0% Airport Services Gate  Access Cards    Initial Issue NA  Free  NA Free  NA Airport Services Gate  Access Cards Initial Issue for non‐direct Airport Tenants  NA                     35.00  NA  $                  35.00  0% Airport Services Gate  Access Cards    Replacement NA                    25.00  NA $                  25.00  0% Airport Services
Hangar Padlock Keys    Duplicate Key NA                      5.00  NA $                     5.00  0% Airport Services Hangar  Padlock Keys    Re‐key Padlock NA                    35.00  NA $                  35.00  0% 54 Public Works
Fee Group 1 Fee  Group 2 Fee Group 3 Fee Group 4 Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee Percent  Change
Airport Services Landing  Fee    0 ‐ 3,500 pounds Per Landing NA                      2.00  NA $                     2.00  0% Airport Services Landing  Fee    3,501 ‐ 6,250 pounds  Per Landing NA                      4.00  NA $                     4.00  0% Airport Services Landing  Fee    6,251 ‐ 12,500 pounds  Per Landing NA                      8.00  NA $                     8.00  0% Airport Services Landing  Fee    12,501 ‐ 25,000 pounds  Per Landing NA                    16.00  NA $                  16.00  0% Airport Services
Landing Fee    25,001 ‐ 50,000 pounds  Per Landing NA                    32.00  NA $                  32.00  0% Airport Services Landing  Fee    50,001 pounds and above  Per Landing NA                    64.00  NA $                  64.00  0% Airport Services Landing  Fee    0 ‐ 3,500 pounds Daily NA                      5.00  NA $                     5.00  0% Airport Services Landing  Fee    3,501 ‐ 6,250 pounds  Daily NA                    10.00  NA $                  10.00  0% Airport Services Landing Fee    6,251 ‐ 12,500 pounds  Daily NA                    20.00  NA $                  20.00  0% Airport Services Landing  Fee    12,501 ‐ 25,000 pounds  Daily NA                    40.00  NA $                  40.00  0% Airport Services Landing  Fee    25,001 ‐ 50,000 pounds  Daily NA                    80.00  NA $                  80.00  0% Airport Services Landing  Fee    50,001 pounds and above  Daily NA                  160.00  NA $                160.00  0% Airport Services Landing  Fee    0 ‐ 3,500 pounds Monthly NA                    13.00  NA $                  13.00  0% Airport Services Landing  Fee    3,501 ‐ 6,250 pounds  Monthly NA                    26.00  NA $                  26.00  0% Airport Services Landing  Fee    6,251 ‐ 12,500 pounds  Monthly NA                    52.00  NA $                  52.00  0% Airport Services Landing  Fee    12,501 ‐ 25,000 pounds  Monthly NA                  104.00  NA $                104.00  0% Airport Services Landing  Fee    25,001 ‐ 50,000 pounds  Monthly NA                  208.00  NA $                208.00  0% Airport Services
Landing Fee    50,001 pounds and above  Monthly NA                  416.00  NA $                416.00  0% Airport Services Hangar  Exchange    Administration Fee for Exchange between Tenants each Tenant  NA                     60.00  NA  $                  60.00  0% Airport Services Hangar  Exchange    Administration Fee for Exchange into Vacant Hangar  NA                     60.00  NA  $                  60.00  0% Airport Services    Tie‐Down Exchange Administration Fee to Exchange tie‐ down spaces  NA                     25.00  NA  $                  25.00  0% Airport Services Vacated  Hangar Cleanup    Cleanup and disposal of items, minimum charge of 2 hours  NA                   150.00  NA  $                150.00  0% Airport Services Vacated  Hangar Cleanup    Additional hours, hourly rate NA                    75.00  NA $                  75.00  0% Airport Services      Ramp Sweeping Services NA                    90.00  NA $                  90.00  0% Airport Services   Maintenance Staff Service Charge hourly plus  materials NA                    75.00  NA $                  75.00  0% Airport Services Airport Administration Building
Meeting Room
Non‐profit Aviation organization charging
no fee to the public  NA   No charge  NA  No charge  NA Airport Services Airport Administration Building
Meeting Room
For‐profit Aviation organization charging a
fee to the public per day  NA                   200.00  NA  $                200.00  0% Engineering Services Publication    Standard Detail $               68.97                    17.00  49% $                  34.00  100% Engineering Services Publication    No Parking Signs $               25.78                    14.00  100% $                  25.00  79% Engineering Services Publication    Copy and print full size prints (24x36) first 10 pages  $                  5.00                       5.00  100%  $                     5.00  0% Engineering Services Publication    Copy and print full size prints (24x36) 11+ pages  $                  2.00                       2.00  100%  $                     2.00  0% Engineering Services Survey    Curb and gutter staking, up to 100 linear ft.  $             851.41                   760.00  100%  $                851.00  12% Engineering Services Survey    Curb and  gutter staking: after 100 linear feet ‐ each additional 50 linear feet  $             372.15                   190.00  100%  $                372.00  96% Engineering Services Survey    Grade calculations and cut sheets per location  $             372.15                   342.00  100%  $                372.00  9% Engineering Services
Survey    Form checking: up to 100 linear feet $             761.28                  760.00  100% $                761.00  0% Engineering Services Survey    Form checking: after 100 linear feet ‐ each additional 50 linear feet  $             190.11                   190.00  100%  $                190.00  0% Engineering Services Sidewalk  Rehabilitation Program    Single Family Residential lots  $          2,542.00                   550.00  22%  $                550.00  0% Engineering Services
Sidewalk Rehabilitation Program    Multi Family with 1 or 2 damaged locations  $          2,542.00                   550.00  22%  $                550.00  0% Engineering Services Sidewalk Rehabilitation  Program    Additional locations  $          2,542.00                   550.00  22%  $                550.00  0% Engineering Services      Major Street Improvement Plan Review Deposit Time and  Materials $          2,520.29               2,400.00  100% $             2,520.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Concrete   Curb, gutter, and/or sidewalk (including driveway) first 100 linear feet  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Concrete   Each additional 100 linear feet or fraction thereof  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Concrete   Driveway, handicapped ramp, curb return  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Concrete   Planter strip fill (each property)  $             154.62                   146.00  100%  $                154.00  5% 55 Public Works
Fee Group 1 Fee  Group 2 Fee Group 3 Fee Group 4 Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee Percent  Change
Engineering Services Public Works Encroachment Permit
Inspection Fees Drainage   Drainage system and appurtenance, first 100 linear feet  $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Drainage   Each additional 100 linear feet or fraction thereof  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Drainage   Drainage tie‐in to existing structures  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Drainage   Non‐standard structures (other than above)  $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Drainage   Manholes, vaults, area drains, storm water inlets, other standard structures  $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Drainage   Storm Water Interceptors    $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Street cuts, trenches, up to 100 linear feet  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Each additional 100 linear feet or fraction thereof  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Street cuts, other, up to 100 square feet  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Each additional 100 sq. feet or fraction thereof  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Debris box placed in right‐of‐way  $             270.63                   259.00  100%  $                270.00  4% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Sidewalk area obstruction fee, first week  $             579.84                   578.00  100%  $                579.00  0% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Sidewalk area obstruction fee, each additional week  $             115.95                   108.00  100%  $                115.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Street Work & Miscellaneous   Compaction tests ‐ each test as required per hour  $             115.95  Time &
Materials  100%  Time & Materials  NA
Engineering Services Public Works Encroachment Permit
Inspection Fees
Monitoring well inspection
and plan review   First well: Inspection  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees
Monitoring well inspection
and plan review   First well: Plan Review  $             534.64                   436.00  100%  $                534.00  22% Engineering Services Public Works Encroachment Permit
Inspection Fees
Monitoring well inspection
and plan review   Each additional well at same site:

Inspection  $             193.29                   184.00  100%  $                193.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees
Utility Services ‐ New or
Repaired   Each new or replaced utility pole location  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees
Utility Services ‐ New or
Repaired   Each utility service connection in sidewalk
or street (gas, electric, telephone, etc.)  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals From main in street or easement to building up to 100 linear feet  $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals Each additional 100 linear feet or fraction thereof  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals Add for monitoring structure if required   $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals From existing stub at right‐of‐way to building up to 100 linear feet  $             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals Each additional 100 linear feet or fraction thereof  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals Each building sewer repair or replacement:

In public right‐of‐way, complete  $             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Laterals Each building sewer repair or replacement:

In public right‐of‐way, complete: In private
property (no street evacuation)
$             425.18                   403.00  100%  $                425.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Building Court Mains
Each building court main when plan, profile
and cut sheet are required, initial 100 feet
or less
$             541.13                   512.00  100%  $                541.00  6% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Building Court Mains Each additional 100 feet or fraction thereof  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Building Court Mains
Each building court main when plan only is
required for initial 100 feet or less  $             483.16                   457.00  100%  $                483.00  6% 56 Public Works
Fee Group 1 Fee  Group 2 Fee Group 3 Fee Group 4 Title Unit Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee Percent  Change
Engineering Services Public Works Encroachment Permit
Inspection Fees Sanitary Sewers Sanitary Sewer Building Court Mains Each additional 100 feet or fraction thereof  $             309.24                   293.00  100%  $                309.00  5% Engineering Services Public Works Encroachment Permit
Inspection Fees Additional Inspectors
For any public works encroachment
permit on which an unreasonable
number of inspections are required,
an additional fee per inspection will
be charged for each inspection over
and above the number deemed
reasonable by the City Engineer.
$             270.63                   259.00  100%  $                270.00  4% Engineering Services Public Works Encroachment Permit
Inspection Fees Development Plan Review   Industrial/Commercial  Variable                   730.00  100%  $                730.00  0% Engineering Services Public Works Encroachment Permit
Inspection Fees Development Plan Review   Residential  Variable                   360.00  100%  $                360.00  0% Penalties Public Works penalty for grading
without a permit  NA                2,000.00  NA  $             2,000.00  0% Penalties Code violation illegal project, penalty
fee may be applied daily  NA                   125.00  NA  $                125.00  0% Penalties Code Enforcement Investigations
fees for permit not yet obtained  NA                2,000.00  NA  $             2,000.00  0% 57 Utilities & Environmental Services
2017
Fee Group 1 Fee Group 2 Fee Group 3 Title Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Water Service Charges Fire Flow Test
Does not apply to special
circumstances as determined
by City
326.57$                                           300.00  100% 326.00$ Water Service Charges Other Water System Fees and Charges Account Establishment Fee 70.69$                                             40.00  72% 51.00$ Water Service Charges Other Water System Fees and Charges After‐Hours Meter Activation Fee 72.34$                                             70.00  97% 70.00$ Water Service Charges Other Water System Fees and Charges Meter Lock Fee 92.06$                                             80.00  87% 80.00$ Water Service Charges Other Water System Fees and Charges Meter Removal Fee 90.22$                                             80.00  89% 80.00$ Water Service Charges Other Water System Fees and Charges Meter Test Fee (≤ 1 inch meter) 223.25$                                           70.00  48% 106.00$ Water Service Charges Other Water System Fees and Charges Meter Test Fee (1 1/2  ‐ 2 inch meter) 295.37$                                         290.00  98% 290.00$ Water Service Charges Other Water System Fees and Charges Meter Test Fee (≥ 3 inch meter) 367.48$                                         290.00  100% 367.00$ Water Service Charges Other Water System Fees and Charges Noticing Fee 6.57$                                                  5.00  76% 5.00$ Water Service Charges Development Plan Review Industrial 179.93$                   N/A  50% 89.00$ Water Service Charges Development Plan Review Commercial 112.46$                   N/A  50% 56.00$ Water Service Charges Development Plan Review Residential 67.47$                     N/A  50% 33.00$ Stormwater System Service Charges Stormwater Treatment Measure Inspection 352.87$                                           275.00  100% 352.00$ Stormwater System Service Charges Stormwater  Facility Inspections Industrial (under State Permit) 303.88$                                         185.00  76% 229.00$ Stormwater System Service Charges Stormwater  Facility Inspections Industrial (not under State Permit) 303.88$                                         150.00  66% 200.00$ Stormwater System Service Charges Stormwater  Facility Inspections Restaurant 196.39$                                         130.00  80% 156.00$ Stormwater System Service Charges Stormwater  Facility Inspections Commercial 165.90$                                         110.00  80% 132.00$ Solid Waste Plan Review Fees Development Plan Review Single Family or Remodel 52.07$                                             50.00  96% 50.00$ Solid Waste Plan Review Fees Development Plan Review Tract Development 169.15$                                         160.00  95% 160.00$ Solid Waste Plan Review Fees Development Plan Review Commercial/Industrial Tennant Improvement w/ Trash Enclosure 128.73$                                           120.00  93% 120.00$ Solid Waste Plan Review Fees Development Plan Review Commercial/Industrial Tennant Improvement w/o Trash Enclosure 87.84$                                               80.00  91% 80.00$ Solid Waste Plan Review Fees Development Plan Review Mixed Use (Commercial & Residential) Variable Actual Cost  100% Actual Cost Wastewater Discharge Permit Fees &
Miscelaneous Charges Development Plan Review Industrial 338.37$                                           165.00  66% 221.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Development Plan Review Commercial 338.37$                                             95.00  44% 148.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Development Plan Review Residential 206.47$                                             50.00  39% 80.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Categorical New Permit 3,103.50$                                     2,210.00  83% 2,581.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Categorical Permit Renewal 2,131.50$                                     1,500.00  83% 1,760.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Categorical Amendment 761.01$                                           560.00  85% 645.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Non‐Categorical Significant New  Permit 2,101.84$                                     1,410.00  80% 1,687.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Non‐Categorical Significant Permit  Renewal 1,525.67$                                     1,010.00  80% 1,215.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Non‐Categorical Significant Amendment 594.58$                                           410.00  82% 485.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Groundwater New Permit 1,109.98$                                        740.00  100% 1,109.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Groundwater Permit Renewal 594.58$                                           440.00  100% 594.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Groundwater Amendment 367.08$                                           270.00  100% 367.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Non‐Sewered Credit New Permit 334.64$                                           410.00  100% 334.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Non‐Sewered Credit Permit Renewal 334.64$                                           410.00  100% 334.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Discharge Permit Fees Special Purpose New Permit One time Discharge 600.20$                                           390.00  100% 600.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Compliance Schedule Compliance Schedule for correction violations 701.39$                                           695.00  99% 695.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Sampling Composite Sample with Lab Costs 583.35$                                           580.00  99% 580.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Sampling Composite Sample without Lab Costs 313.35$                                           300.00  96% 300.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Sampling Grab Sample 270.87$                                           185.00  100% 270.00$ 58 Utilities & Environmental Services
2017
Fee Group 1 Fee Group 2 Fee Group 3 Title Notes Full Cost  Current Fee Cost Recovery
Level (%) Suggested Fee
Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Sampling Violation Follow‐Up Sample with Lab Cost 590.90$                                           585.00  99% 585.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Sampling Violation Follow‐Up Sample without Lab Cost 320.90$                                           300.00  93% 300.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Wastewater Sampling Sampling Equipment Fee 25.00$                                               25.00  100% 25.00$ Wastewater Discharge Permit Fees &
Miscelaneous Charges Violation follow‐up inspection Violation follow‐up inspection 509.62$                                           345.00  81% 411.00$ 59 Constructi
on Type and
Minimum Cost Per Square Foot
International Building Code Group
*Building Division staff will help determine the valuation for occupancies or construction types not listed in this table. IIA IIB IIIA IIIB VA VB A-1 Assembly, theaters, with stage 250.68 240.19 225.83 219.32 206.42 198.60 A-1 Assembly, theaters, without stage 228.45 217.96 203.72 197.21 184.31 176.49 A-2 Assembly, restaurants, bars, banquet halls 192.64 186.17 173.98 170.26 157.39 153.11 A-3 Assembly, churches 230.86 220.38 206.42 199.91 187.02 179.20 A-3 Assembly, general, community halls, libraries 189.02 179.70 164.41 159.06 145.00 138.34 A-4 Assembly, arenas 226.13 216.80 201.40 196.05 181.99 175.33 B Business 197.57 187.78 171.16 164.72 150.21 143.56
E Educational 208.97 199.66 186.44 176.96 162.93 157.97 F-1 Factory and industrial, moderate hazard 113.48 109.24 97.87 93. 45 80.62 75.91 F-2 Factory and industrial, low hazard 113.48 108.08 97.87 92. 29 80.62 74.75 H-1 High Hazard, explosives 106.56 101.15 91.18 85. 60 73.93 N/A H-2 H-3 H-4 High Hazard 106.56 101.15 91.18 85. 60 73.93 68.06 H-5 (HPM) semiconductor fabrication 197.57 187.78 171.16 164.72 150.21 143.56 I-1 Institutional, supervised environment 198.33 188.77 174.64 169.92 156.62 151.64 I-2 Institutional, hospitals 343.28 333.50 315.69 N/A 294.74 N/A I-2 Institutional, nursing homes 233.15 223.37 207.90 N/A 186.95 N/A I-4 Institutional, day care facilities 198.33 188.77 174.64 169.92 156.62 151.64 M Mercantile 141.28 134.80 123.37 119.65 106.78 102.50 R-1 Residential, hotels 200.16 190.60 176.76 172.04 158.75 153.76 R-2 Residential, multiple family 165.67 156.11 142.97 138.25 124.96 119.97 R-3 Residential, one- and two-family 158.35 154.08 148.42 144.55 138.89 130.68 R-4 Residential, care 198.33 188.77 174.64 169.92 156.62 151.64 S-1 Storage, moderate hazard 104.24 99.99 88.86 84. 44 71.61 66.90 S-2 Storage, low hazard 104.24 98.83 88.86 83. 28 71.61 65.74 U Utility, miscellaneous 80.09 76.01 68.70 64.16 54.32 51.77 Development Services Department 310.3.16
A. Building Permit Fees
 Valuation is defined as the fair market value of materials and labor for the work.  Valuation shall be the higher of the stated valuation or the figure from the current International Code Council valuation table below.
 The current ICC Valuation data table below is adjusted with a regional constructi on cost modifier for the San Francisco Bay Area of 16%*.
*Source:  The local modifier is 1.16 times the cost per square foot as published in the Building Standards Journal, April 2002 edition.  The valuation for tenant improvements, residential remodels or other projects that do not involve new square footage, shall be a minimum of 60% of the cost per square foot in the valuation table below.

BUILDING PERMIT FEES CALCULATED BY VALUATION
This includes all new buildings, additions, tenant improvements, residential remodels and cell sites 60 TOTAL VALUATION
(Materials and Labor) BUILDING INSPECTION FEE
$1 to $500 $29.77
$501 to $2000 $29.77 for the first $500 plus $3.87 for each additional $100 or fraction thereof, to and including $2000

$2,001 to $25,000 $87.82 for the first $2000 plus $17.74 for each additional $1000 or fraction thereof, to and including $25,000
$25,001 to $50,000 $495.68 for the first $25,000 plus $12.80 for each additional $1000 or fraction thereof, to and including $50,000
$50,001 to $100,000 $815.70 for the first $50,000 plus $8.87 for each additional $1000 or fraction thereof, to and including $100,000
$100,001 to $500,000 $1259.15 for the first $100,000 plus $7.09 for each additional $1000 or fraction thereof, to and including $500,000
$500,001 to $1,000,000 $4097.18 for the first $500,000 plus $6.02 for each additional $1000 or fraction thereof, to and including $1,000,000
$1,000,001 and up $7109.14 for the first $1,000,000 plus $4.00 for each additional $1000 or fraction thereof  Once the valuation for the project is established, use the table below to determine the Building Inspection Fee.

Several other fees are based on the Building Inspection Fee and this is outlined on the next page.

BUILDING PERMIT FEES CALCULATED BY VALUATION
This includes all new buildings, additions, tenant improvements, residential remodels and cell sites *All sub‐permits (plumbing, mechanical and electrical) are included in the plan check and inspection fees for valuation based projects. 61 BUILDING INSPECTION FEE          Based from Fee Table                  $____________ PERMIT ISSUANCE FEE   (Flat Rate applies to all permits)                   $147 BUILDING INSPECTION FEE x 1.0 = BUILDING PLAN CHECK FEE:     $____________ Plan Check fees for master plans shall be 1.25 x the BUILDING INSPECTION FEE INSPECTION FEES
**Fire re‐inspection fees are $387
*Hazardous Materials Inspection Fees
vary on complexity of project (see
Hazardous Materials comments below
in Plan Review Fee Section for
examples and contacts for estimates.)
ADMINISTRATIVE FEES

Administrative fees apply to all
permits.  This includes the individual
permits not calculated by valuation
on the following pages.

BUILDING PERMIT FEE:    $ ____________
The Building Permit Fee is defined as the sum of the plan check, inspection, and administrative fees. Some projects will also have impact fees which are calculated separately.

SMIP: $__________
CA BLDG. STANDARDS FEE   $__________
SMIP FEE RESIDENTIAL:
.00013% OF VALUATION

SMIP FEE COMMERCIAL:
.00028% OF VALUATION
CA BUILDING STANDARDS FEE:
$1.00 (Valuation $1‐25k)
$2.00 (Valuation $25‐50k)
$3.00 (Valuation $50‐75k)
$4.00 (Valuation $75‐100k)
Add $1 per every 25k over 100k
BUILDING INSPECTION FEE x .03 = TECHNOLOGY FEE:                        $ ___________ **FIRE INSPECTION FEE                       Flat Rate                                     $221 *HAZ‐MAT INSPECTION FEE             Minimum              $284/inspection BUILDING INSPECTION FEE x .35 = PLANNING REVIEW FEE:            $____________ PLAN REVIEW FEES
The Building Plan Check Fee applies to
all permits. Other review fees will be
applied based on the specific scope of
work.
*Hazardous Materials Review and
Inspection fees generally range from
$1,300 for small projects, such as
cellular communication sites to
$4,000 for larger or more complex
projects, such as those t hat  may have
H‐Occupancies.  Please contact the
Hayward Fire Department at (510)
583‐4900 for an estimate for your
specific project.

BUILDING INSPECTION FEE x .35 = *FIRE REVIEW FEE:                      $____________ BUILDING INSPECTION FEE x .16 = COMMUNITY PLANNING FEE:   $ ___________ SOLID WASTE REVIEW FEE           Flat Rate                                           $80 BUILDING PERMIT FEES CALCULATED BY VALUATION*
This includes all new buildings, additions, tenant improvements, residential remodels and cell sites. *All sub‐permits (plumbing, mechanical and electrical) are included in the plan check and inspection fees for valuation based projects.

PLOT PLAN REVIEW FEE  (Planning and Building) Flat Rate per Plot        $441 This only applies to production homes.
*HAZ‐MAT REVIEW FEE                      Minimum                                      $142/hour FIRE PLOT PLAN REVIEW FEE                          Flat Rate per Plot        $110 This only applies to production homes.
62 Miscellaneous Permit Fees – Not Calculated by Valuation Unit                               Fee

1. Standard Hourly Rate (or fraction thereof) for Plan Check and Inspections hour   $147/hour

2. Revision (permit issuance fee and hourly plan check will also be charged) hour  $147

3. Permit Issuance Fee (applies to all permits) each  $147

4. Miscellaneous Items (for items that do not have a set fee) each                                    $147

5. Plot Plan Review
a. Plot Plan Review and Processing (in addition to permit issuance fee)   $441

6. Address Assignment
a. Single each  $220.50
b. Multiple each  $73.50

7. Demolition

Building Inspection
Fee

a. Commercial/Residential demolition up to 3,000 square feet 0‐3000 sf  $294 b. Each additional 3,000 square feet each  $147

8. Equipment Installation first piece  $294
a. Additional Equipment at Same Site each  $147
b. Equipment Pad each  $220.50

9. Damaged Building Survey
Fire, flood, vehicle or similar damage    $588

10. Patio Covers
a. Patio Cover (requires drawi ngs and hourly plan check) each  $294 b. Enclosed Patio (requires drawings and hourly plan check)  each   $588

11. Photovoltaic Systems
a. Residential (for systems that are not flush mounted, hourly plan check fees apply) each system  $300 b. Commercial, up to 50 kilowatts (hourly plan check fees apply) each system  $1,000 c. Commercial, each additional kilowatt 51kw-250kw (hourly plan check fees apply) each kw  $7 d. Commercial, each additional kilowatt over 250kw (hourly plan check fees apply) each kw  $5

12. Residential Package Permits
a. Tub / Shower Enclosure (includes trades)    $147
b. Remodel- Complete Bathroom (includes trades)    $220.50 c. Remodel- Kitchen (includes trades)    $441

13. Storage Racks
a. Up to 100 linear feet first 100lf  $441
b. Each additional 100 linear feet each 100lf  $147

63 Plumbing Mechanical & Electrical Fees – Not Calculated by Valuation Unit

Building Inspection
Fee

14. Plumbing Permits – Residential (single-family and duplexes) a. Water Heater each  $73.50
b. Fixtures – covers 2 Inspections for any type or number of fixtures 2 site visits  $147 c. Water Service Repair / Replacement each  $73.50
d. Water Pipe (Repair or Replacement) each  $147
e. Sewer on private property or Cleanout Installation each  $147 f. Sewer Ejector System each  $147
g. Solar Water Heating System - Hourly plan check fees may apply for systems that are not flush mounted or have other structural issues. each  $147 h. Residential Gas Piping   $147
i. Residential Gas Test or Meter Reset each  $147

15. Plumbing Permits – Commercial + Multi-Family
a. Water Heater (Repair or Replacement) each  $147
b. Water Service (Repair or Replacement) each  $147
c. Sewer Ejector System each  $147
d. Industrial / Commercial Process Piping System
Each 100 linear feet
or fraction thereof  $147
e. Gas Piping
Each 100 linear feet
or fraction thereof                                  $147 f. Gas Test / Meter Reset each  $147
g. Sewer on private property or Cleanout Installation each  $147 h. Grease Trap each  $147
i. Grease Interceptor each  $147
j. Vacuum Breaker, Backflow Preventer or Pressure Regulator each  $147

16. Mechanical Permits – Residential (single-family and duplexes) a. Heating and/or Cooling Equipment (including ducts) each  $147 b. Wall Furnace each  $147
c. Kitchen Hood and Bathroom Vents  each  $73.50

17. Mechanical Permits – Commercial + Multi-Family
*For units over 400 pounds or for replacements that are not in the same location, hourly plan review fees apply.
a. *HVAC unit (includes all associated sub-permits) each  $220.50 d. *Air Handler Unit  each   $147
b. Vent System each   $147
c. Exhaust Hood Replacement (additional hourly plan check may apply) each   $147

18. Electrical Permits – Commercial, Residential + Multi-Family a. General Electrical Permit - Residential (rough and final) each  $294 b. General Electrical Permit – Commercial + Multi-Family (rough and final) each  $441 c. Service Upgrade -- Residential  each  $514.50
d. Additional Meter Reset (general electrical permit for first) each  $73.50 e. Temporary Power Installation each   $147
64 Additional Services and Violations – Not Calculated by Valuation Unit                               Fee

19. Expedited Services
a. Expedited Hourly Plan Review hour  $220.50/hour
b. Expedited Plan Review each  200% of Plan Review Fee c. Phased Approval Permits each  $588
d. Temporary Certificate of Occupancy each  $588

22. Copies, Re-Print + Change of Contractor
a. Microfilm Reproduction (8.5” x 11”) each
$3 for first sheet
$1 for each additional
b. Printing Scanned / Archived Drawings each  $10 per sheet c. Job Card / Permit Re-Print each  $147
d. Change of Contractor each  $147

23. Special Inspector Qualification Review
a. Initial Review for Approved Inspector List each  $588 b. Renewal Review (after 3 years) each  $294

24. Violation Fees

a. Investigation Fee for work done without Permits (in addition to the regular permit fees)  Each project
200% of the Building
Permit Fee
b. Filing of Notice of Substandard or Hazardous Structure  each  $147 c. Removal of Notice of Substandard or Hazardous Structure each  $147 d. Placards for Condemnation each   $147
e. Notice and Order each  $147
Electrical Permits (Continued)
Building Inspection
Fee
f. Residential E.V. charger each  $73.50
g. Commercial E.V. charger (may re quire additional hourly plan review) each  $294 h. Minor Residential Electrical Permit (final only- no rough) each  $147 i. Minor Commercial Electrical Permit (final only- no rough) each  $220.50

65

← All documents from this meeting