UP
UP
C C C
PARKING LOT #1
23 SPACES
OVERFLOW /
TEMPORARY
PARKING LOT #4
(30 SPACES)
B1
(E) TENNYSON PARK
N.I.C.
R U U S R O A D
W E S T T E N N Y S O N R O A D
EVCS
BIORETENTION
LANDFORM
SLOPED
GRASS
SEATING TERRACED
SEATING
PROGRAM
COURT
STAGE
PARKING LOT #2
47 SPACES
PUBLIC
ENTRY
PARKING LOT #3
18 SPACES
PUBLIC ENTRY
PUBLIC
ENTRY
PUBLIC ENTRY
RESTRICTED ENTRY
OUTDOOR
PLAY AREA
OUTDOOR
PLAY AREA
OUTDOOR
PLAY AREA
PROPERTY LINE, TYP.
(N) DRIVE ACCESS
CONCEPTUAL LIMIT OF WORK BOUNDARY.
FOR DETAILED BOUNDARY, SEE C-SERIES
DRAWINGS
DN
C CEV
P A N J O N S T R E E T
EVCS EVCS EVCS EVCS EVCS
EVCS
B2
P1
PL2
PL1
P2
P3
PL3PL4
A1
A2
P4
GATEWAY
PLAZA
PL4
(NEW) SOUTH
HAYWARD YOUTH &
FAMILY CENTER
(REMODEL) MATT
JIMENEZ COMMUNITY
CENTER (MJCC)
EVCS
F.F. 20.5'
1-HR. RATED WALL
@ PROP. LINE
C
C C
A1.20
5 A1.20
1 SP.07
SP.11
SP.12
SP.13
SP.14
SP.16
SP.18
SP.20
SP.06
SP.05
SP.04
SP.26
SP.27
SP.16
26' - 0"
GATE
F.H.
F.H.
F.D.C. P.I.V
.
SEE CIVIL TRUCK
TURN EXHIBIT FOR
FIRE APPARATUS
CIRCULATION
EX03
EX02
SP.28
MC EV EV EV EV EV EV EV EV EV EV EV EV EV S
DN
SP.29
TRASH STAGING (2) 4 CU. YD
DUMPSTERS (1) 3 CU. YD
DUMPSTER - 4 DAY/WEEK
SP.30
EVEV EV
CEVS
MC
S S SS SS S S S S
C C C C
EV
VAN
C
S SS
S
EV
C C C C
S
SP.20
SP.20
SP.20
S S
S S S S S S S S S S S S S S S S S S S S S S S
S S
SP.06
B1
B2
P1
PL2
PL1
P2
P4P3
PL4
PL3
A1
A2
A3
SHEET NOTES
WASTE COLLECTION PER HAYWARD UTILITIES & ENVIRONMENTAL SERVICES:
CONTAINER CAPACITY CALCULATIONS
# OF EMPLOYEES x LBS. TRASH GENERATED PER EMPLOYEE / WEEK ÷ 150 = CUBIC YARDS / WEEK
NORTH BUILDING - BUILDING ONE
BUSINESS TYPE POUNDS PER EMPLOYEE / WEEK
RETAIL - FOOD STORE 112
(3 x 112) ÷ 150 = 2.24
SERVICES - BUSINESS SERVICES 65
(36 x 65) ÷ 150 = 15.6
SERVICES - EDUCATION 31
(14 x 31) ÷ 150 = 2.89
SERVICES - MEDICAL / HEALTH 58
(19 X 58) ÷ 150 = 7.35
B1 TOTAL CUBIC YARDS / WEEK = 28.08
(2) 4CU YD. BINS W/ 4 DAY PICK-UP
SOUTH BUILDING - BUILDING TWO
BUSINESS TYPE POUNDS PER EMPLOYEE / WEEK
MANUFACTURING - FOOD 62
(1* x 65) ÷ 150 = 0.43
*1 EMPLOYEE ASSUMED FOR SPORADIC USE OF (E) KITCHEN
SERVICES - BUSINESS SERVICES 65
(6 x 65) ÷ 150 = 2.6
SERVICES - EDUCATION 31
(10 x 31) ÷ 150 = 2.07
B2 TOTAL CUBIC YARDS / WEEK = 5.1
(3) 96 GALLON CARTS W/ 4 DAY PICK-UP
B1
LEGEND
(NEW) SOUTH HAYWARD YOUTH & FAMILY CENTER
B2 (REMODEL) MATT JIMENEZ COMMUNITY CENTER (MJCC)
P1 PARKING LOT #1 (@NE)
P2 PARKING LOT #2 (BETWEEN B1 & B2)
P3 PARKING LOT #3 (@SW)
P4 OVERFLOW/TEMPORARY PARKING LOT #4 (@SE)
PL1 GATEWAY PLAZA (NW)
PROGRAM COURT PLAZA
OVERFLOW/TEMPORARY PARKING LOT #4 (@SE)
B2 PLAY AREA
PL2
PL3
PL4
A1 WASTE ENCLOSURE (@NE)
A2 ARCHITECTURAL SITE WALL (@NORTH)
BUILDINGS
PARKING LOTS
OUTDOOR PLAZA
SITE ACCESSORY
A3 MOVIE PROJECTING DEVICE STANCHION
Drawing No.
If this drawing is not 30" x 42", it is a reduced print - scale accordingly. All rights reserved. Material may not be reproduced in any form without permission from RossDrulisCusenbery Architecture, Inc.
Drawn By
Date:
Scale:
Checked By
Sheet Title
Preliminary Design. Not For Construction Purposes.
Project No.
As indicated
A1.11
OVERALL
ARCHITECTURAL SITE
PLAN PHASE I+II
January 11, 2023
THE STACK CENTER
680 WEST TENNYSON ROAD &
28200 RUUS ROAD
HAYWARD, CA
PERMIT SET
2018071
GG MC
1" = 20'-0"1 SITE KEY PLAN - PHASE II 0' 10' 20' 40'
N
1/64" = 1'-0"
SITE ZONING DIAGRAM
KEYNOTES
SP.04 PAINTED STRIPES, TYP, S.C.D.
SP.06 SPRING LOADED, ADJUSTABLE BOLLARDS FOR ACCESS CONTROL SP.07 BICYCLE RACKS, S.L.D.
SP.11 SITE FURNITURE, S.L.D.
SP.12 ENTRY DEVICE STANCHION
SP.13 BICYCLE LOCKERS, S.L.D.
SP.14 PV BATTERY STORAGE BANK - BASIS OF DESIGN - (5) TESLA POWER PACKS + INVERTER - 1.15 MW SP.16 PV STRUCTURAL SUPPORT STEEL AND CANOPY ABOVE, TYP.
SP.18 PG&E TRANSFORMER PAD 90"X106", 36" CLEAR 3 SIDES
SP.20 (N) BIORETENTION, S.C.D. & S.L.D.
SP.26 SITE/GROUNDS MAINTENANCE STORAGE
SP.27 WASTE ENCLOSURE
SP.28 SEE LANDSCAPE DRAWING FOR DIMENSIONS & LAYOUT
SP.29 PROPERTY LINE, S.C.D. FOR MORE DETAIL
SP.30 RELOCATE EXISTING TRANSIT STOP SIGNAGE ADJACENT MONUMENT SIGN. SEATING AT MONUMENT SIGN TO BE USED FOR ADDITIONAL BUS STOP PARKING.
REVISIONS
No. Description Date
1 PERMIT SET 2 March 3, 2023
ATTACHMENT III