Cities Index.
Documents Received After Published Agenda

Hayward City Council
December 5, 2023

Document
Documents Received After Published Agenda
Meeting
December 5, 2023
Body
Hayward City Council
Original file
424 KB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar.com. That file is the official record.

CITY COUNCIL MEETING
DECEMBER 5, 2023

DOCUMENTS RECEIVED AFTER

PUBLISHED AGENDA
Agenda Q&A Log
AGENDA QUESTIONS & ANSWERS
MEETING DATE: December 5, 2023

Consent Item CONS 23‐648
Adopt a Resolution Authorizing the City Manager to Amend the Professional Services Agreement with Brown and Caldwell to Increase the Contract Amount by $8,023,117 to a Not‐to‐Exceed Amount of $16,672,828 for Final Design Services for the Water Pollution Control Facility (WPCF) Improvements Phase II Project No. 07760, and Authorize use of Contingency Funds for Design of the Existing Final Clarifiers Retrofit

Did the Infrastructure Committee hear this item and what was the general input from them? This item was not brought up to the infrastructure committee.

It is a large increase, doubling the projected cost, so I am wondering if the unanticipated amount of ground water that you are seeing, that is affecting the longevity of the clarifiers, is due to sea level rise? And if so, will this be an accelerating cost as sea levels rises and we have to do more and more to deal with ground water, or are there other ways that coastal cities are mitigating this problem, like other above ground systems or moving it to higher ground?

The  preliminary  design  phase  included  a  hydrogeological  investi gation  to determine  if  installing  external  groundwater  dewatering  wells  was  feasible  to relieve  the  groundwater  pressure  on  the  structure  when  dewatering  them  for annual inspection and maintenance. If groundwater dewatering wa s found to be feasible,  the  cost  of  the  rehabi litation  would  have  been  far  le ss  as  concrete patching  would  be  sufficient  for  long  term  performance  of  the  structure.  The preliminary  design  technical  memorandum,  submitted  in  August,  o utlined possible  retrofits  which  included  periodic  repairs  (concrete  pa tching)  to retrofitting  (new  interior  walls,  slabs,  and  micropiles)  to  ful l  re‐build  of  the clarifiers with drilled piers. We would be happy to discuss thi s part of the project in more detail at the next infrastructure meeting.

The construction cost to retrofi t Final Clarifiers 1 and 2 is e stimated to be $25.1 million. The rest of the Phase II project costs amount to $214 million resulting in a roughly 12% increase in the estimated construction cost.

The  final  clarifiers  are  constructed  on  top  of  a  confined  aquifer  which  is  under pressure and can exert an upward force on the clarifiers when they are empty and out of service. The clarifiers were engineered to drain groundwater through a wick drain system which extended down into the confined aquifer through a perimeter groundwater relief system consisting of PVC piping and relief wells drilled into the side of the clarifier. Normally when the tanks are in service a nd full of water, the hydraulic pressure exerted from the outside groundwater is balanced by the water inside  the  tank.  When  the  tanks  are  emptied  for  maintenance,  gr oundwater pressure is relieved by draining through the relief wells. Over  time the wick drain system  failed  causing  the  walls  to  experience  excessive  groundwater  pressure

which caused the structural issu es. In this case, sea level ris e did not contribute directly to the structural issues.

Normally, high groundwater levels, including those resulting fr om sea level rise, are  handled  structurally  through  a  variety  of  means  including  p ile  supported foundations,  passive  groundwater  relief  systems,  active  groundw ater  relief systems (such as use of groundwater dewatering wells to lower t he groundwater levels prior to emptying a basin), etc. The current project und er design includes pile supported foundations to re sist buoyant uplift on the slab s of the structures when taking out of service for maintenance. Walls and other str uctural features will  also  be  designed  considering  future  sea  level  rise.  Critic al  facilities  are designed to be situated above the projected sea level rise over  the design life of the structure. Raising existing hydraulic structures at the pla nt is not feasible due to the cost of the structures, space available on the plant site, and related pumping costs to raise hydraulic grade so flow can go by gravity through the site.

Public Comments
From: Tim Romano-Pugh
To: List-Mayor-Council
Subject: public comment for 12/5/23 meeting
Date: Tuesday, December 5, 2023 2:43:58 PM
Timothy Romano-Pugh
Hayward resident
Hello Mayor and Council,
I am emailing to urge the Council to follow step with cities like Oakland to write a resolution for an enduring ceasefire in Gaza. I believe our community can not stay silent or complicit in the continued indiscriminate killing of civilians and children that is happening in Gaza. Many of our community members are deeply affected by this, some losing family and friends to needless violence. We must do what we can to show our people we are willing to stand up for them and protect them. Hayward has not backed down from controversy in the past when it came to protecting those who are marginalized and vulnerable. We can't stop now.

Thank you
From: Grace Nichols
Sent: Tuesday, December 5, 2023 4:29 PM
To: List-Mayor-Council <[email protected]> Subject: Licensed Therapist Calling for IMMEDIATE CEASEFIRE SUPPORT Dear Mayor's office,
I cannot make it to the meeting at 6:30 this evening. I want to state that I am a Licensed Marriage and Family Therapist, License #109372, and a resident of Hayward. I am asking in this email, in support of Hayward citizens, that the city of Hayward support an IMMEDIATE CEASEFIRE in Gaza and the West Bank. Please DO NOT SUPPORT MASS MURDER!!!!!! Violence is NEVER THE ANSWER!!! I SUPPORT A FREE PALESTINE AND FREEDOM FOR ALL INDIGENOUS PEOPLE EVERYWHERE.

PLEASE STAND ON THE RIGHT SIDE OF HISTORY! CEASE FIRE NOW! FREE GAZA NOW! LET PALESTINE LIVE!!!
Sincerely,
Grace Nichols, LMFT
Item# 16
PH 23-048
Spectator Ordinance
Modifications
From: HAYWARD CONCERNED CITIZENS <[email protected]> Date: December 5, 2023 at 11:24:53 PM PST
To: List-Mayor-Council <[email protected]> Subject: Sideshows
CAUTION:This is an external email. Do not click on links or open attachments unless you know the content is safe.

Mayor and Council,

Just some thoughts from our organization with regard to the comments made proposing that Hayward legitimize sideshows as a cultural event:

This suggestion seeks to normalize an activity that is of huge safety and liability risk and that there is little control over. Can Hayward afford the accountability when the planned event goes sour?

There are not enough personnel to ensure this type of event would be kept contained and that parameters would be abided by. We would rather see our limited sworn officer staff placed in areas they are most needed rather than on standby for such an event.

Stolen cars are often the means by which sideshows take root. To legitimize sideshows is to say our city condones the use of potentially stolen vehicles, unless there are permits in place to verify the vehicles’ registration, use the venue they are driven in, etc, which can cost the city extra money it cannot afford to dip into right now.

And most importantly, for a council that strives to be proactive about addressing climate change and reducing our carbon footprint it seems odd to condone an activity that maximizes waste of gas, burning rubber that sends chemicals in the air, and creating exhaust and other noxious pollutants that harm our climate.

For all of these reasons we encourage you to please reconsider,

HAYWARD CONCERNED CITIZENS

← All documents from this meeting