Cities Index.
Presentations

Council Infrastructure & Airport Committee
February 26, 2025

Document
Presentations
Meeting
February 26, 2025
Body
Council Infrastructure & Airport Committee
Original file
13.3 MB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar.com. That file is the official record.

1 Council Infrastructure & Airport
Committee Meeting
Presentations
February 26, 2025
1 Council Infrastructure & Airport Committee
Santa Clara Street Traffic Calming Project No. 053033
ACT 25-0088
HAYWARDH1
Santa Clara St Traffic Calming Project
Public Works –Transportation 2/26/2025

HAYWARDH
1 W A St
El Dorado Ave
HAYWARDH2
• Objective: T o improve the safety of Santa Clara St between W A St and Winton Ave
• Existing Conditions
o 2-Lane Roadway
o Existing Class II Bike Lanes
o Posted Speed Limit: 25mph
o 85th Percentile Speed: 36mph
o Avg Daily Traffic: 15,000 vehicles
• 6,000 through vehicles
o 12 Injury Collisions (2018-2023)
• 2 fatal & 1 severe injury collisions
Project Overview
2 P PBike
Lane
Bike
Lane
NB
Lane
SB
Lane
Turn
Lane
Fatal
Collision
Severe
Collision
Existing Cross Section
El Dorado Ave
HAYWARDH3
Public Engagement
• Open House on 2/6/2025 - 30 participants
• Speeding vehicles
o Difficult to exit driveways and minor streets
o Challenging to cross Santa Clara St.
• Street is dar k at night – additional streetlights needed • Many collisions, included crashes into parked cars & houses • Too much thr ough traffic, trying to avoid I-880
• Additional traffic controls needed s uch as stop signs or traffic signals

HAYWARDH4
Proposed Improvements
Immediate
Streetlights
Maintenance
Sign Replacements
Red Curb
Short-Term (1-2 Years)
Ped & Bike
Improvements
Traffic Control Study
Long-Term (5 Years)
Intersection Upgrades
Lane Reconfigurations
Buffered Bike Lane High Visibility Crosswalk
HAYWARDH5
Proposed Improvements
Long-Term Improvements (5+ Years)
• Intersection upgrades
• Improvements to evaluate
o Single left turn from A St & Winton Ave
o Add intersection controls – stop sign or
signal, roundabouts
o Potential raised median sections to address
u-turns
Rectangular Rapid
Flashing BeaconConcrete/Painted Curb Extensions
El Dorado Ave
W A St
HAYWARDH6
Next Steps
Description Date
2nd Public Outreach Fall/Winter 2025
Implement Short-Term Improvement Summer 2026
Finalize and Implement Long-Term Improvement TBD
HAYWARDH7
Questions?
For any questions, please contact:

Jade Kim
Assistant Transportation Engineer
[email protected]
Hugh Louch
Deputy Director of Public Works-Transportation
[email protected]
1 Council Infrastructure & Airport Committee
Update on the Hayward Boulevard Feasibility Study, Project No. 05217
ACT 25-009
HAYWARDH1
Hayward Boulevard Feasibility Study
Public Works & Utilities – Transportation 2/26/2025

HAYWARDH
Campus Dr
Farm Hill Dr
Spencer Ln
Civic Ave
Carlos Bee Blvd
HAYWARDH2
Table of Contents
• Objective: Create a safer corridor for pedestrians,
bicyclists, transit, and motorists
• Updated project & phasing
I. Restriping plan
II. Sidewalks & crossing enhancements
III. Long term project
2 HAYWARDH3
Phase 1 – Restriping

EXISTING

PROPOSED
Some segments
with median
Several areas of
sidewalk gaps
Wide outside lanes
Separated lanes
uphill
Buffered lanes
downhill
Near CSU Near Farm Hill Dr
HAYWARDH4
Phase 1 – Restriping
Two-way path from Tribune Ave to Sebastopol Ln
(accessing to CSU campus) Turn lanes at Spencer Ln and Call Ave Speed markings on
steepest part of
corridor
Parkside Dr
Tribune Ave
Civic Ave
Call Ave
Parkside Dr
12%9%2%2.5%3.5%4%
2%
HAYWARDH5
Phase 2 – Sidewalk Gaps & Crossings
RRFBs & median enhancements
• Parkside Dr
• Spencer Ln
• Farm Hill Dr
Sidewalk gap
closures near
Civic Ave
HAYWARDH6
Next Steps
Description Date
Finalize Phase 1 striping plan Spring 2025
Implement Phase 1 restriping Summer/Fall 2025
Finalize Phase 2 Sidewalk & Crossings Design Spring 2026 Implement Phase 2 Spring 2027
Finalize and Implement Phase III TBD
HAYWARDH7
Questions?
Hugh Louch
(510) 583 - 4781
[email protected]
1 Council Infrastructure & Airport Committee
2024 Airport Noise Report
Annual Noise Report for 2024
February 26, 2025

Managing Noise

Airport Noise Monitors
3 Airport Operations vs. Complaints
4 Airport Operations vs. Exceedances
5 Households vs. Total Complaints
6 Total Complaints vs. Exceedances
7 Neighborhood Complaints
8 San Lorenzo, 215, 65%
Unknown, 16
Hayward, 81, 24% Cupertino, 1
DanVille, 1
Castro Valley , 2
Gilroy, 1
Berkeley, 1
Pleasanton, 2
Oakland, 2
San Carlos, 1
Union City, 3
Belmount, 1
Los Gatos, 1
San Francisco, 1San Mateo, 1Sunyvale, 2
San Jose, 1
Total Complaints by Location
9 Complaint Reduction
• Outreach
• Publicity
• Use of Technology
10 Contact Information
• Noise Contacts
• Email: [email protected]
• Noise Hotline
• 510.293.8692
Conclusion
Questions

← All documents from this meeting