1 Council Infrastructure & Airport
Committee Meeting
Presentations
August 27, 2025
HAYWARDH1
Ruus Road Complete Streets Project
Public Works – Engineering & Transportation 8/27/2025

HAYWARDH
1 HAYWARDH2
Project Goals
• Safety
• Climate Action
• Bike Plan Implementation
• Accessibility

HAYWARDH3
Ruus Road Existing Conditions
• 0.6 mile corridor
• One lane in each direction
• Transit route
• Narrow bike lane
• Residential and Light Industrial
land uses
• Daily traffic – 7,600 vehicles per
day
• 25 mph speed limit; 85th
percentile speed 34 mph
HAYWARDH4
Project Background
• Ruus Rd is proposed as a Class IV
bike facility in the Bicycle and
Pedestrian Master Plan (2020)
• Hayward residents and commuters
reached out to City about need for
better bike facilities (2023)
• Traffic analysis for Ruus and Industrial
in response to a resident request:

Protected left turn warranted (2023)
• City awarded HSIP grant (2024)
• With launch of Hayward Rides, City
hopes to provide safe places to bike

HAYWARDH5
Project Overview
Protected Left Turn
Protected
IntersectionTwo-way Protected
Bike Lane
Traffic Calming
Crossing Enhancements
Proposed ProjectExisting
11 1111 11 48 88 44 6 6
HAYWARDH6
Outreach
• Emails received about bicycling conditions on Ruus Road and need for protected left turn prior to project initiation • Door-to-door outreach Summer 2024
• Public meeting July 30, 2025
o Peixoto Center
o 1,000 notifications mailed (English/Spanish)
o Follow-up door-to-door visit on week of the meeting
o 10 participants
• CIAC meeting notified with emails to meeting participants HAYWARDH7
Outreach
Community Input How Incorporated into Plan
Concerns about traffic and speeding,
exiting driveways, crossing the street
 Traffic calming throughout corridor
 Reduced speeds should facilitate
driveway access
Concern about loss of parking for bike
lane
 Collected parking occupancy data
 Provide safer crossings for people
parked across street
Visibility challenges at Ruus Ln  Restripe intersection to improve sightlines
 Study crosswalk, stop sign, RRFB
Need for new streetlights and repair of
existing streetlights
 Identified three potential streetlight
locations
 Assigned technician to confirm
working condition of streetlights
Support for protected left turn  Key element of project Concern that narrowing roadway will
increase traffic
 Project does not affect capacity
HAYWARDH8
Design Considerations
• Two-way bikeway advantages:
• Few driveway conflicts
• Direct connection to Ward Creek Trail
• Requires less street space than Class IV on both sides • Parking concerns considered, but there are options
Parking
Spaces
Sunday
Afternoon
Weekday
Evening
Weekday
Midday
Folsom Ave to Thiel Rd
21 33% 33% 33%
Thiel Rd to Ruus Ln 87 29% 23% 15%
Ruus Ln to Industrial 98 2% 26% 83%
Ruus Ln* 38 8% 26% 61%
HAYWARDH9
Project Details
9 Connection to
Ward Creek Trail
New signal equipment for
protected left turn
Protected
Intersection
Flashing Beacon
Ruus Rd and Ruus Ln
Ruus Rd and Thiel Rd
Ruus Rd and Industrial Pkwy
Potential New
Crosswalk
Speed Humps
Location TBD
Visibility
Enhancements

HAYWARDH10
Next Steps
Description Date
Finalize Concept Plan Fall 2025
Develop Project PS&E Spring 2026
Construction Complete Spring 2027

HAYWARDH11
For this item, staff seek input from the Committee and
Public Comment
Thank you
Lucas Woodward
Senior Transportation Engineer
(510) 583 - 4783
[email protected]
Hayward Police Department Year-End Report
1 Interstate 880 & A Street
Interchange Update
Council Infrastructure & Airport Committee
City Hall
August 27, 2025

Hayward Police Department Year-End Report
2 Overview
• History
• Project Benefits
• Funding – Design Phase
• Advancing to Design Phase
• Funding – Construction Phase
• Recommendation
Hayward Police Department Year-End Report
3 History
• Alameda County Transportation Commission passed the 2014 Transportation Expenditure Plan
• 2019 – Project Initiation Document complete, approval to proceed to Environmental phase
• 2021 – Council selected six-lane alternative
• 2022 – Draft Project Report approved
• 2022 – Draft Environmental Document circulated
• 2022 – Caltrans rejects six-lane alternative
• 2022 – Five-lane alternative selected
Hayward Police Department Year-End Report
4 Hayward Police Department Year-End Report
5 Project Benefits
• Bicycle and
pedestrian
connection
• Ramp
operations
• Visual
improvements
• Grant-funded
corridor study
for A Street

Hayward Police Department Year-End Report
6 Funding – Design Phase
• City has multiple interchange projects (5)
• A Street interchange improvements are the least complex • A Street is currently in the environmental phase
• $4,000,000 total needed for design phase of A Street
Hayward Police Department Year-End Report
7 Advancing to the Design Phase
• $4,000,000 total needed for design phase of A Street
• Funding is available
• City commits $1,350,000 of Measure BB
• Does not impact City general fund
• ACTC commits remaining funding
• Urgency to approve environmental
• $50,000 federal earmark expiring
Hayward Police Department Year-End Report
8 Advancing to the Design Phase
• Alameda CTC is the current implementing agency
• Alameda CTC will not be implementing agency for the
design phase unless clear funding plan for
construction
• City will work with Alameda CTC to develop a funding
plan so that implementing agency status can transition
back to Alameda CTC
• The implementing agency is tasked to propose,
develop, and implement a project
Hayward Police Department Year-End Report
9 Funding – Construction Phase
• $20,000,000 estimated
cost
• Local Alternative
Transportation
Improvement Program
(LATIP)
• Can fully fund
construction phase
• Does not impact general
fund
• Some uncertainty

Hayward Police Department Year-End Report
10 LATIP
• I-238 Bypass canceled, funding shifted to local projects • Approved by the California Transportation Commission in 2010 • Contains revenues from Route 238 properties sold
• Approved LATIP project list, for each project:
• Amount of funding allocated
• Order of priority (must be followed)
• A Street is on the project list, but has lower priority • City will need to initiate the process to move A Street to higher priority to access funding
• Legislative action required to change
Hayward Police Department Year-End Report
11 Next Steps
• Approve City contribution of $1,350,000 of Measure BB funding to design phase
• September 2nd City Council
• Alameda CTC to update TIP listing for design phase
• City to be listed as interim implementing agency for design phase • City to continue to work with Alameda CTC to develop a funding plan for construction
• Complete environmental phase, start design phase in Q4 2026 Hayward Police Department Year-End Report
12 Recommendation
If approved by CIAC, staff will present the item to Council for their approval for the City Manager to execute a funding agreement with Alameda CTC for the City to contribute $1,350,000 to the PS&E phase of the I-880 A Street Interchange Project

Oral Update Slides
Hayward Police Department Year-End Report
1 Main Street Complete Streets

HAYWARDH1
East Bay Greenway Multimodal Project
1 HAYWARDH2
Mission Blvd On-Street Parking Pilot Project
2 HIN Phase 1: Road Safety A udit Report
• High-Injury Network (HIN) Safety
Plan Phase 1 Corridors:
• Downtown A rea (A St, B St, M ission)
• A St from Hesperian to M ission
• B St from M artin L uther K ing to 4th
Street
• T ennyson Road from Hesperian to
Mis s ion
• R oad Safety A udits completed
• Corridor alternatives in October
CIA C meeting

Hayward Rides
• 50 bi kes assembled
• Helmets, front & rear lights, and
locks in stock
• Support contract for Eden Y outh &
Fa mily be ing dra fte d
• T eam ready to mov e f orward
• Urgent: Determine launch event
date
• Standalone event at City Hall
• E arli est av ai lable dates:
• A ny weekend date i n October
except 10/11 & 10/12

Outreach at B ackpack Giv eaway

Dollar Street/Harder Road Congestion Update