May 19-20, 2010
Item 4.15
Attachment

PRIORITIZED LOCAL ALTERNATIVE TIP PROJECT LIST
Facility
I N/A
2 Local
3 580
4 880/238/580
5 880/238/580
6 880
7 880
8 880/92
9 880/580/92/
238
State Route 238 Hayward Bypass Local Alternative TIP
($ ,000)
Location Responsible Project Name/Description Total Fund Agency Need
N/A Caltrans Land Disposition Fees $10,000
Hayward Hayward Mission Blvd. -Foothill $30,000
Blvd. Corridor
Improvements.

Castro Valley ACTA 580/Redwood Rd 1/C $3,000
Various TBD Sound Walls $10,000
Various TBD Integrated Corridor $32,500
Management and Ramp
Metering
Hayward Caltrans Auxiliary Lanes:

ACCMA Paseo Grand to Winton $32,500
Whipple Rd to Industrial $19,500
Parkway West
San Leandro & Caltrans HOV Project $10,000
County ACCMA Development
Hayward& Interchanges:

San Leandro Hayward! Clawiter/Whitesell 1/C $52,000
ACCMA 880/lndustrial Pkwy 1/C $41,000
San 880/Davis 1/C $11,100
Leandro/ 880/Marina 1/C $24,400
ACCMA
Various Cal trans HOV Projects and Other
ACCMA Interchanges:

TBD NB HOV Extension $155,500
NB 238/880 Conn. $31,000
Washington 1/C $31,000
880/Whipple 1/C $13,500
880/West A 1/C $27,000
880/West Winton 1/C $25,000
92/Industrial I/C $6,000
580/Strobridge I/C $21,000
Total Fund Need $570,200
Freeway project locations are shown on the map on the following page.

Notes
Amount unknown, $10
million estimated
Contingencies
allowance
To prepare PSR
Funding needed for
Davis and Marina
reduced to reflect costs
borne by Southbound
HOV project (1-bond)
If the 238/880
Connector and
Washington 1/C are
constructed
concurrently, total
funds needed decrease
from $62,000 to
$46,200. The lower
number was used to
calculate total need.

ATTACHMENT IV
Ramp Metering)
1-880 Auxiliary lanes. Paseo Grande to
Winton Avenue
1·880 Auxiliary Lanes, Whrpple Road to
Industrial Parkway West
- HOV Project Development W"l/<!OI A, II. &<Cll
R' 1·880/Route 92 Reliever -
Clawlter/WhiteseU Interchange
1-asonndustrtal Parkway West
Interchange
K 1·880/DaVJs Str~t lntercMnge
L 1~880/Manna Boulevard Interchange
G 1·8801Wh•PPie Road Interchange
M i--8801West A Street Interchange
N 1·880tWest Winton Avenue lnterc hange
t
0 Route 92/lndusttial Boulevard
Interchange
P 1·580/Strobndgo Off·Ramp Modifkatron
I C Extend Northbo\lnd !·SilO High
• Occuparn:y Vehicle (HOVJ Lane>
/>JB Interchange
',\f,
'.· \;
Central Alameda County
Freeway Study
Figure 1
LATIP In
Priority Order
May 19-20,2010
Item 4.15
Attachment

ATTACHMENT IV