Cities Index.
Attachment VI Charging Requirements

Hayward City Council
November 18, 2025

Document
Attachment VI Charging Requirements
Meeting
November 18, 2025
Body
Hayward City Council
Pages
1
Original file
447 KB
Text extracted from the city's file for reading and search. Open the original on hayward.legistar1.com. That file is the official record.

ATTACHMENT VI

Page 1 of 1 ends

Table 1. Comparison Between CalGreen and Hayward’s Current Reach Code Requirements

Land Use
Type CalGreen Requirements Effective January 1, 2026 Current Reach Code Requirements Single Family &
Townhome  One L2 EV Capable space per dwelling unit  Two L2 EV Ready spaces per dwelling unit Multi-Family Residential
Unassigned spaces:
 25% L2 Charger
 75% LP L2 EV Ready

Assigned Spaces:
 100% LP L2 EV Ready + Direct Wiring*
 Same as CalGreen
Office and Retail  15% L2 Charger
 5% L2 EV Capable
 20% L2 Charger
 30% L2 EV Capable
Other Non-Residential
Uses
 10% L2 Charger
 10% L2 EV Capable  Same as CalGreen
Hotel/Motel  25% L2 Charger
 40% LP L2 EV Ready  Same as CalGreen

Definitions:
 Direct Wiring specifies that EV Charging circuits will be directly tied to the unit’s electric panel or meter.  EV Capable means the electric panel has necessary capacity and conduit is installed to parking spaces.  EV Ready means EV Capable and wiring and outlet are installed.  EVCS means Electric Vehicle Charging Station (charger) is installed.  Level 1 (L1): 15-20 Amp, 120 Volt (standard household outlet). Driving distance provided: 3-4 miles per hour of charge.  Low-Power Level 2 (LP L2): 20 Amp, 208/240 Volt. Driving Distance provided: 10-15 miles per hour of charge.  Level 2 (L2): 40+ Amp, 208/240 Volt. Driving Distance provided: 25-30 miles per hour of charge.  Level 3(L3) (Direct Current or DC Fast Charging): 80-400 Amp, 200-600 Volt DC. Driving Distance provided: 100+ miles per hour of charge.

← All documents from this meeting