Task # Task Description Staffing Position Rate
Estimated
Hours Total
Task 1 Project Management Project Manager $140.00 6 $ 840.00 Task 4 Archaeological Monitoring Principal Archaeologist $150.00 26 $ 3,900.00 Archaeological Monitor $ 90.00 260 $23,400.00
Task 5 Archaeological Report Principal Archaeologist $150.00 32 $ 4,800.00 Archaeologist $ 95.00 24 $ 2,280.00
GIS Technician $ 95.00 2 $ 190.00
Technical Editor $ 85.00 2 $ 170.00
$35,580.00 Subtotal
$ 4,269.60 G&A
$ 700.00 Travel
$40,549.60 Subtotal
$ (6,730.06) Remaining Budget
$33,819.54 TOTAL
$ 6,763.91 20% Contigenty
$40,583.45 Additional Funds NTE
For any questions related to this change order request, please contact Sally Evans at (707) 823-7400, or [email protected]
Sincerely,
Sally Evans, M.A, RPA
Principal Archaeologist
Mobile: (707) 484-9628
6.E.c
Packet Pg. 103 Attachment: Evans & De Shazo Inc Additional Services Proposal (4847 : Foley Pavilion Environmental Engineering and Archaeology Contract
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Annual Review of Good Faith Compliance with the Terms and Conditions of Development Agreements for the following Projects: 1. Mill District Project (Replay Healdsburg, LLC; Eden Mill District, LP); 2. North Village Project (CCS Healdsburg, LLC; Kendal at Sonoma, A Zen Inspired Community; BHDC North Village, LLC); and 3. Saggio Hills Affordable Housing Project (Freebird Development Company, LLC) PREPARED BY: Linda Ruffing, Planning Consultant
STRATEGIC INITIATIVE(S):
Establish Proactive Policies/Programs to Continue to Promote Economic Diversity & Sustainable Growth
Pursue Initiatives that Promote Environmental Stewardship Expand Affordable Housing Opportunities
Maintain and Improve Infrastructure and Facilities
Provide Effective Governance
Maintain and Enhance Public Health and Safety
Provide Resident-Driven Community Services
RECOMMENDED ACTION(S):
Adopt a Resolution finding that Replay Healdsburg LLC, Eden Mill District LP, CCS Healdsburg LLC, Kendal at Sonoma, A Zen Inspired Community, BHDC North Village, LLC, and Freebird Development Company, LLC are in good faith compliance with the terms and conditions of their respective development agreements.
COMMUNITY ENGAGEMENT/OUTREACH:
The annual review of a development agreement ("DA") is an administrative action that is limited in scope to compliance with the terms of the DA pursuant to Government Code section 65865.1 and Healdsburg Municipal Code section 17.20.050.A. These provisions require that, once every 12 months during the term of a DA, the City Manager shall review the extent of each developer's good faith substantial compliance with the terms of its respective DA.
This report is brought forward to the City Council to provide transparency to the community regarding the status of three development projects in Healdsburg that were subject to DAs in the
6.F
Packet Pg. 104
past year: Mill District, North Village, and the Saggio Hills Affordable Housing project, and to evaluate the compliance of each project with its respective DA.
BACKGROUND:
Mill District Development Agreement. On April 1, 2019, the City entered into a DA ("Mill District DA") with Replay Healdsburg, LLC ("Replay") for the Mill District Project. The Mill District DA provides Replay with certain assurances that they may proceed with a development project that includes: a hotel containing approximately 53 guest rooms; up to 208 residential apartments and condominiums (including 40 rental units for occupancy by low-income and very low-income households, 30 multi-family residential units for occupancy by middle-income households, and not more than 138 condominium units to be sold as market rate housing); approximately 15,000 square feet of commercial space; and a variety of amenities including a privately owned and maintained park for public use and enjoyment, public plaza spaces; bicycle racks and shared vehicle charging stations. Replay is required to pay fees and costs associated with certain project improvements as identified in the Mill District DA. The term of the Mill District DA is for a period of 15 years unless extended or terminated by mutual agreement of the City and Replay. When Replay transferred title to Lot 7 (the affordable housing parcel) to Eden Mill District, LP, ("Eden") on April 21, 2021, certain rights and obligations of the Mill District DA were assigned to Eden. On April 19, 2022, Replay conveyed Lot 4 to Canopy Healdsburg, LLC ("Canopy"). On November 5, 2024, Canopy transferred title to the common areas on Lot 4 to Mill District Unit 4 Association ("Canopy HOA") and entered into a partial Assignment and assumption Agreement to assign certain rights and obligations of the Mill District DA were assigned to Canopy HOA.
North Village Development Agreement. On April 6, 2020, the City entered into a DA ("North Village DA") with Comstock for the North Village Project. The North Village DA provides Comstock with certain assurances that they may proceed with a development project that includes: a senior living community with 221 independent living units, a total of 54 assisted living and memory care beds, and ancillary facilities such as dining options and health/wellness/fitness facilities. Affordable units include 10 independent living units targeted to moderate-income households in the senior living community and 20 units targeted to workers and volunteers serving the senior living community who are in the very low-, low- and moderateincome ranges. The project also includes a 108-key hotel with a restaurant, rooftop bar, meeting spaces and a spa and fitness facility; 12,000 square feet of commercial retail space; 53 multifamily residential units targeted to a mix of very low-income, low-income and moderate-income households, and 27 units targeted to middle-income households. Comstock is required to pay fees and costs associated with certain project improvements as identified in the North Village DA. The term of the North Village DA is for a period of 10 years unless extended or terminated by mutual agreement of the City and Comstock. On August 20, 2020, Comstock entered into an Agreement with Kendal at Sonoma, A Zen Inspired Community ("Kendal") to assign certain rights and obligations of the North Village DA to Kendal. On February 1, 2023, Comstock transferred a 3.01-acre portion of Parcel 4 to Burbank Housing Development Corporation ("Burbank") and entered into a partial Assignment and Assumption Agreement to assign certain rights and obligations of the North Village DA to Burbank.
Saggio Hills Affordable Housing Project Development Agreement. On May 17, 2023, the City entered into a DA ("Saggio Affordable Housing DA") with Freebird Development Company, LLC ("Freebird") for the Saggio Hills Affordable Housing project. The DA provides
6.F
Packet Pg. 105
Freebird with certain assurances that they may proceed with a development project that includes:
a total of 118 affordable housing units, a community building, open space and recreation facilities, and public and private improvements. As approved, the housing would consist of 42 apartments in four three-story walk-up buildings; 48 apartments in a three-story apartment building; 18 apartment or condominium units in two three-story buildings; and 10 two-story townhome units. The term of the Saggio Affordable Housing DA is for 10 years or upon completion of development of all phases of the project, whichever comes first, unless the Phase 1 improvements have not commenced within 5 years, in which case the DA will be deemed terminated.
DISCUSSION/ANALYSIS:
The City provided notice of this required annual review to each of the developers who is party to one of the three DAs. Each developer provided an update on the status of their project and good faith compliance with the DA, as summarized below.
MILL DISTRICT DA - Replay. The following information was submitted by Replay (Attachment 2), in accordance with Section 7.5 of the Mill District DA, to demonstrate compliance with the terms of the DA:
1. Accounting of the Fees Paid due and Due to the City of Healdsburg:
• Since March 12, 2024, the total fees paid to the City is $1,613,287.82, consisting of the following breakdown:
o City Staff and Contract Staff $ 351,210.19
o Landscape and Lighting District
Assessments
$ 76,382.57
o Lot 4 City Staff and Contract Staff $ 74,970.61
o Lot 4 Permit Fees $ 10,160.91
o Lot 4 School Fees $ 485,111.44
o Lot 4 Park Fees $ 85,937.30
o Lot 4 Other Impact Fees $ 187,684.22
o Lot 1 City Staff & Contract Staff $ 1,001.71
•
o Electrical System Equipment & Staff
The following payments are currently due:
$ 340,828.87
o None
2. Project Approvals that have been Applied for or Approved this Review Period:
• The 4th Amendment to the Agreement had its second reading and was approved by the City Council in October 2024 and became effective in November 2024. • Hotel on Lot 1: the Planning Commission approved the Major Design Review in August 2024.
• Retail & Residential Amenity on Lot 5 Parcel A: the Planning Commission approved the Major Design Review in October 2024, and a Building Permit
6.F
Packet Pg. 106
application was submitted in February 2025.
3. Construction Activity that has Commenced or Completed this Review Period:
• The Park was completed in August 2024.
• The Public Improvement project was completed in March 2025 with only limited punch list work continued into April 2025. The Public Improvements were accepted by the City Council on 5/5/25.
• Lot 4 (“Canopy”) construction completed in January 2025 and the Final Certificate of Occupancy wasissued on 2/6/25.
4. Compliance with Development Agreement Sections 5.1 through 5.4:
Section 5.1: Affordable Housing Units
• Completed in July 2023
Section 5.2: Middle Income Units
• Replay has not submitted planning applications for any future developments that contain Middle Income Units
Section 5.3: Public Improvements
• See above for the Park and the Public Improvements updates.
Section 5.4: Additional Developer Contributions
• Section 5.4(a) – No longer applicable.
• Section 5.4(b) – The first Connectivity Fund payment of $150,000 was paid and the second installment of $250,000 will be paid within 30 days of request from the City.
• Section 5.4(c) – The Fire Ladder Truck payments were paid in full during the prior Review Period.
• Section 5.4(d) – The Lighting and Landscape District and payments have been made this Review Period with the amount specified above.
5. Enforced Delays or Permitted Delays this Review Period:
• There have not been any enforced delays or permitted delays as provided for under section 7.6 of the Agreement.
6. Transfer or Assignments this Review Period:
• Lot 4 was Assigned to Mill District Unit 4 Association (“Canopy”) on November 5, 2024.
MILL DISTRICT DA - Canopy HOA. The following information was submitted by Canopy HOA (Attachment 3) to demonstrate compliance with the terms of the Mill District DA in accordance with the Partial Assignment and Assumption of the Development Agreement.
1. Review Period:
• From November 5, 2024, to March 11, 2025.
6.F
Packet Pg. 107
2. Subsequent Project Approvals Applied for or Approved During the Review Period:
• None
3. Construction Activity that has been Commenced or Completed during the Review Period:
• Work on completion of Canopy punch list items was performed by the Project Developer, Canopy Healdsburg, LLC, during the Review Period and a Final Certificate of Occupancy was obtained on February 6, 2025.
4. Description of Compliance with Sections 5.1 through 5.4 of the Agreement:
• Not Applicable
5. Description of any Forced Delay or Permitted Delay:
• Not Applicable
6. Description of any Transfer or Assignments:
• The Assignment and Assumption Agreement between Canopy Healdsburg, LLC and the Mill District Unit 4 Association took effect on November 5, 2024.
MILL DISTRICT DA - Eden. The following information was submitted by Eden (Attachment 4) to demonstrate compliance with the terms of the Mill District DA in accordance with the Partial Assignment and Assumption of the Development Agreement and Estoppel Agreement.
1. Description of any subsequent project approvals that have been applied for or approved.
• Not applicable
2. Description of any construction activity that has been commenced or completed during the applicable annual review period.
• None.
3. Description of any subsequent project approvals that have been applied for or approved.
• Temporary Certificate of Occupancy was approved on May 24, 2003. Final Certificate of Occupancy was approved on October 20, 2023.
4. Description of compliance with Section 5.1 through 5.4 of the Agreement re:
Additional Developer Contributions.
• Section 5.1(a):
Section 5.1(a)
Affordability
Area Median Income Section 5.1(a) Unit
Count Requirement
The Randall Unit
Count
6.F
Packet Pg. 108
Requirement
Very Low Income up to 50% 24 24*
Low Income 50-80% 16 16*
Middle Income 81-120% no more than one 1 manager's units *Some units may be restricted at deeper affordability levels by other regulatory agreements • Section 5.1(b):
Bedroom Size Section 5.1(b) Unit Count
Requirement
The Randall Unit Count
3 (20) 2 & 3 bedroom units total; no
fewer than (4) 3 bedroom units
11 2 11
1 n/a 19
Total 41 (including (1) 2 bedroom
manager's unit)
• Section 5.1(c): An Affordable Housing Agreement with the City was entered into by Replay Healdsburg, LLC for a term of 55 years effective December 31, 2020. Replay Healdsburg, LLC subsequently assigned this agreement to Eden Mill District, L.P. through an Assignment and Assumption of Affordable Housing Regulatory Agreement and Declaration of Restriction Covenants and Estoppel Agreement effected April 21, 2021.
• Section 5.2 – 5.4: Not applicable per Section 3, Allocation of Rights and Obligations (a)(iii) of the Partial Assignment and Assumption of Development Agreement and Estoppel Agreement.
5. Description of any Enforced Delay or Permitted Delay as provided for under 7.6 of the Mill District DA that occurred during the applicable annual review period. • Not applicable
6. Description of any transfer or assignments as provided for under Section 9 of the Mill District DA that occurred during the applicable annual review period. • Not applicable
NORTH VILLAGE DA - Comstock. In accordance with Section 7.5 of the North Village DA, the following information was submitted by Comstock (Attachment 5) to demonstrate compliance with the terms of the DA.
1. An accounting of the fees due and paid to the City. Since February 11, 2024, the
6.F
Packet Pg. 109
total amount of fees paid to the City is $169,463.60 consisting of the following breakdown:
• Hotel Building Inspection Fees: $152,166.22
• Contract Planner, staff and City Legal: $17,297.38
2. Assignments or transfers of the Property.
• None
3. All Construction of public improvements under this Agreement. • A Subdivision Improvement Agreement was issued on July 14, 2021. Major public improvements are under construction.
• All work under the Subdivision Improvement Agreement is substantially complete pending minor corrective action for Foss Creek Pathway surface cracking and miscellaneous concrete repairs on Healdsburg Avenue.
4. Description of any subsequent project approvals that have been applied for or approved.
• Parcel 4 (Burbank Housing)
o Building Permit was issued for Construction on May 14, 2024 • Parcel 2
o Owner submitted Building Permit Application and Plans for Construction of 27 Townhomes January 7, 2025
5. Description of any construction activity that has been commenced or completed during the applicable annual review period.
• Vertical construction for Parcel 1 (Kendal at Sonoma) is complete and Certificates of Occupancy were issued for the Memory Care Wing.
• Vertical construction of the hotel on Parcel 3 is 85% complete. • Vertical construction for 53 affordable apartments and retail space has commenced.
6. Amendments to Agreement.
• No additional amendments to the Development have been requested.
NORTH VILLAGE DA - Kendal. The following information was submitted by Kendal (Attachment 6) to demonstrate compliance with the terms of the North Village DA that were assigned to Kendal.
1. Section 4.2 re: Impact Fees. The Agreement and Assignment requires Kendal, as assignee of the Developer, to “pay all applicable impact fees imposed pursuant to the Mitigation Fee Act ... that are in force and effect on a City-wide basis... when such Impact Fees are due in connection with the issuance of building permits or site improvement permits for components of the Project.”
• Kendal was billed and has paid impact fees in the amount of $4,379,384.20 pursuant to the City’s Invoice # INV-00015718, dated August 27, 2021. In addition, Kendal paid $1,198,890 in November 2023 as its contribution to the Fire Substation.
2. Section 5.4 re: Senior Living Community Affordable Housing. The Agreement and Assignment requires Kendal, as assignee of Developer, to construct 30 units of “Senior Living Community Affordable Housing... twenty [of which] shall be... Very Low Income... and ten [of which] shall be... Moderate Income.” In addition, Developer is
6.F
Packet Pg. 110
required to enter into a Senior Living Community Affordable Housing Agreement with the City.
• Developer and City have entered into an “Affordable Housing Regulatory Agreement and Declaration of Restrictive Covenants,” dated June 3, 2020, and recorded as Sonoma County Document 2020049787, which by its terms is intended to serve as the Senior Living Community Affordable Housing Agreement required under the terms of the Development Agreement (the “Affordable Housing Agreement”). • On April 4, 2022, the City Council approved a 1st Amendment to the North Village Development Agreement which amended the requirements of the Affordable Housing Agreement to increase the required number of Moderate Income units from 10 to 15, to require 5 Low Income units and to reduce the number of Very Low Income units from 20 to 10.
• Kendal has completed construction of its Senior Living Community facility including the 30 units of Senior Living Community Affordable Housing, and these units are now available for occupancy. Kendal has occupied 11 of the 15 Moderate Income units, 5 of the 5 Low Income Units, and 8 of the 10 Very Low-Income Units. Kendal has reservations for 4 Moderate-Income Units and 1 of the Very Low-Income Units to be occupied by the end of 2025.
3. Section 5.5(d) re: Housing Guaranty and Satisfaction of Obligations. The Agreement and Assignment requires Kendal to identify and designate the Senior Living Community units before issuance of final certificates of occupancy for the Senior Living Community. • The units are identified as follows:
o Moderate Income Units (15): 469, 427, 426, 371, 369, 215, 352, 334, 327, 326, 323, 150, 134, 126, 104
o Low Income Units (5): 422, 418, 322, 318, 206
o Very Low Income Units (10): 468, 368, 227, 226, 218, 210, 127, 118, 110, 106
4. Section 5.8 re: PILOT Agreement. The Agreement and Assignment requires Kendal, as assignee of Developer, to enter into and record a Payment-in-lieu of Taxes (PILOT) Agreement within thirty (30) days of issuance of the first building permit for the Senior Living Community facility.
• Kendal and the City have entered into an Agreement for Payment In Lieu of Taxes, dated June 19, 2021, and recorded as Sonoma County Document 2021077992.
NORTH VILLAGE DA - Burbank. The following information was submitted by Burbank (Attachment 7) to demonstrate compliance with the terms of the North Village DA that were assigned to Burbank.
• Construction began June 2024
• Original Construction completion was anticipated for 10/16/2025, however due to delays from weather and design, completion has been pushed back to 12/16/2025.
6.F
Packet Pg. 111
• Construction progress through April 2025 includes completion of most hard scape, all utilities in place, all three buildings approaching completion of framing. • The remainder of work includes windows and exterior finishes, interior finishes and MEP lines, permanent power, landscaping and final paving.
A reconciliation of the fees due and paid to the City in the reporting period was not included.
Fees paid during the period were primarily for building permit plan check, building inspections and planning services.
SAGGIO AFFORDABLE HOUSING DA - Freebird. The following information was submitted by Freebird (Attachment 8) to demonstrate compliance with the terms of the Saggio Affordable Housing DA.
1. Specify whether Impact fees, Processing fees, Connection fees and/or other fees due and payable have been paid during this annual review period.
Through March 2025, Developer has paid the following fees this review period:
• Final Map Application - $33,176
• Building Permit Plan Review Fee Phase 1 - $70,143
• Healdsburg Electric Cost Recovery Payment - $11,655
Additional permitting and impact fees are anticipated in May 2025 in connection with the Phase I construction loan closing.
2. Describe whether other applicable Development Agreement obligations were completed during this annual review period and, if so, specifically identify such obligations.
During the review period, Developer has secured the following competitive funding sources:
• Phase 1 – Approx $21 million in State Affordable Housing and Sustainable Communities funds for the following:
o Approx $15.7 million to Developer for Phase 1
o Approx $1 million to City for multi-use trail and University Avenue sidewalk improvements
o Approx $3.4 million to Sonoma County Transit to purchase new ZEV vehicle and charging equipment, expand Route 67 including level of service, install 10 new bus shelters in Healdsburg
o $360,000 to CalVANs for 4 vanpool vehicles
o Approx $600,000 for various community programs including anti-displacement activities, workforce development, and bike advocacy
• Phase 1 - $600,000 in County Fund for Housing funds
• Phase 1 – Tax exempt bonds and 4% low income housing tax credits • Phase 2 – Approx $11.6 million in State CDBG-DR funds
6.F
Packet Pg. 112
• Additionally, Developer has applied for the final map (set to be heard by City Council in April) and building permits for Phase 1 and closed on construction financing, and anticipates starting construction on Phase 1 in May/June 2025.
3. Specify whether Developer has assigned the Development Agreement, in whole or in part, or otherwise conveyed the Property or any portion thereof during this annual review period.
• Developer and City have executed a Partial Assignment and Assumption of Development Agreement and Disposition and Development Agreement dated 2/1/24 with Saggio Hills Lot 14, L.P. with respect to the Phase 1 Project and a Partial Assignment and Assumption of Development Agreement and Disposition and Development Agreement dated 9/1/24 with Saggio Hills Lot 3, L.P. with respect to the Phase 2 Project.
REQUIRED FINDING. As required by Government Code section 65865.1 and Healdsburg Municipal Code section 17.20.050.A, the purpose of the annual review of the development agreements is for the City to determine whether each developer has, in good faith, substantially complied with the terms of the applicable development agreement.
Based on the approvals and project-related activities noted in this report, staff recommends that the City Council make a finding of substantial compliance for each DA for this reporting period by adopting the attached resolution (Attachment 1).
ENVIRONMENTAL STEWARDSHIP:
While the annual review process is administrative and has no environmental effects, each developer is bound by and required to perform all mitigation measures for or relating to their project as contained in and required by the environmental documentation and mitigation monitoring and reporting programs for each project.
ALTERNATIVES:
If the City Manager is not satisfied that a developer is performing in accordance with its respective DA and/or the City Council determines that there are significant questions as to whether a developer has complied with the terms and conditions of its agreement, each DA includes provisions for notification and procedures to cure non-compliance, including but not limited to, termination of the DA in accordance with California Government Code section 65856.1 and the Healdsburg Municipal Code.
FISCAL IMPACT:
There are no fiscal impacts related to the proposed action.
ENVIRONMENTAL ANALYSIS:
This annual review of the City's three DAs is an informational report and is not a project that is subject to environmental review because the annual review report could not possibly impact the environment (California Environmental Quality Act, CEQA Guidelines section 15061).
6.F
Packet Pg. 113
Therefore, in accordance with the general rule of the California Environmental Quality Act (CEQA), no further environmental review of the annual review report is required.
ATTACHMENT(S):
Resolution
Replay Mill District DA Annual Review (04-28-25)
Canopy HOA Mill District DA Annual Review (04-28-25)
Eden Mill District DA Annual Review (04-25-25)
CCS Healdsburg No Village DA Annual Review (04-01-25)
Kendal North Village DA Annual Review (04-30-25)
Burbank North Village DA Annual Review (04-30-25)
Freebird Saggio Aff Housing DA Annual Review (03-28-25)
6.F
Packet Pg. 114
CITY OF HEALDSBURG
RESOLUTION NO. -2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG FINDING THAT REPLAY HEALDSBURG
LLC, MILL DISTRICT UNIT 4 ASSOCIATION, AND EDEN
MILL DISTRICT LP ARE IN GOOD FAITH COMPLIANCE
WITH THE TERMS AND CONDITIONS OF THE
DEVELOPMENT AGREEMENT FOR THE MILL DISTRICT
PROJECT; AND CCS HEALDSBURG LLC, KENDAL AT
SONOMA, A ZEN INSPIRED COMMUNITY, AND BHDC
NORTH VILLAGE LLC ARE IN GOOD FAITH COMPLIANCE
WITH THE TERMS AND CONDITIONS OF THE
DEVELOPMENT AGREEMENT FOR THE NORTH VILLAGE
PROJECT; AND FREEBIRD DEVELOPMENT COMPANY LLC
IS IN GOOD FAITH COMPLIANCE WITH THE TERMS AND
CONDITIONS OF THE DEVELOPMENT AGREEMENT FOR
THE SAGGIO HILLS AFFORDABLE HOUSING PROJECT
WHEREAS, on April 1, 2019, the City of Healdsburg (“City”) entered into a Development Agreement (“Mill District DA”) with Replay Healdsburg LLC (“Replay”) as the owner and developer to allow the development of certain real property consisting of 9.59 acres located in the City of Healdsburg, Sonoma County, and more particularly described in the Mill District DA; and WHEREAS, as used herein, the term Mill District DA includes that certain First Administrative Agreement Amendment To Development Agreement And First Administrative Project Amendment dated March 31, 2020, that certain Second Administrative Agreement Amendment To Development Agreement dated December 30, 2020, that certain Third Amendment Project Amendment To Development Agreement dated April 14, 2022, and that certain Fourth Amendment to Development Agreement dated November 20, 2024; and WHEREAS, the term of the Mill District DA is for a period of fifteen (15) years commencing on May 1, 2019; and
WHEREAS, on April 21, 2021, pursuant to a Partial Assignment And Assumption Of Development Agreement, Replay assigned a portion of its interests under the Mill District DA to Eden Mill District LP (“Eden”); and
WHEREAS, on November 5, 2024, pursuant to a Partial Assignment And Assumption Of Development Agreement, Replay assigned a portion of its interests under the Mill District DA to Mill District Unit 4 Association (“Canopy HOA”); and
WHEREAS, as used herein, Replay, Eden, and Canopy HOA shall be referred to as the “Developer” under the terms of the Mill District DA; and
6.F.a
Packet Pg. 115 Attachment: Resolution (4862 : Annual Review of Development Agreements) Resolution No. – 2025
WHEREAS, on April 6, 2020, the City of Healdsburg (“City”) entered into a Development Agreement (“North Village DA”) with CCS Healdsburg LLC (“Comstock”) as the owner and developer to allow the development of certain real property consisting of 32 acres located in the City of Healdsburg, Sonoma County, and more particularly described in the North Village DA; and
WHEREAS, as used herein, the term North Village DA includes that certain First Amendment To Development Agreement dated June 21, 2022, that certain Second Amendment To Development Agreement dated May 18, 2022, that certain Third (Administrative Agreement) Amendment To Development Agreement dated December 22, 2022, and that certain Fourth Amendment to Development Agreement dated June 1, 2023; and WHEREAS, the term of the North Village DA is for a period of ten (10) years commencing on May 6, 2020; and
WHEREAS, on March 17, 2021, pursuant to a Partial Assignment of Rights And Assumption Of Obligations Under Development Agreement, Comstock assigned a portion of its interests under the North Village DA to Kendal at Sonoma, A Zen Inspired Community (“Kendal”); and
WHEREAS, on December 21, 2022, pursuant to a Partial Assignment of Rights And Assumption Of Obligations Under Development Agreement, Comstock assigned a portion of its interests under the North Village DA to BHDC North Village LLC (“Burbank”); and WHEREAS, as used herein, Comstock, Kendal and Burbank shall be referred to as the “Developer” under the terms of the North Village DA; and WHEREAS, on May 17, 2023, the City of Healdsburg (“City”) entered into a Development Agreement (“Saggio Hills Affordable Housing DA”) with Freebird Development Company LLC (“Freebird”), and by virtue of the Disposition and Development Agreement by and between City and Freebird entered into on April 21, 2023, Freebird has a legal and equitable interest in the development of certain real property owned by City which consists of 12.46 acres located in the City of Healdsburg, Sonoma County, and more particularly described in the Saggio Hills Affordable Housing DA; and
WHEREAS, the term of the Saggio Hills Affordable Housing DA is for a period of ten (10) years commencing on May 17, 2023, or upon completion of development of all phases of the project, whichever comes first, unless the Phase 1 improvements have not commenced within five (5) years, in which case the DA will be deemed terminated; and WHEREAS, as used herein, Freebird shall be referred to as the “Developer” under the terms of the Saggio Hills Affordable Housing DA; and
6.F.a
Packet Pg. 116 Attachment: Resolution (4862 : Annual Review of Development Agreements) Resolution No. – 2025
WHEREAS, Healdsburg Municipal Code section 17.20.050.A and Government Code §65865.1 require the City to review the extent of good faith substantial compliance by each Developer with the terms and conditions each respective Development Agreement, once every 12 months during the term of the Development Agreement; and WHEREAS, the City initiated its annual review of the Mill District DA, North Village DA and Saggio Hills Affordable Housing DA by giving each Developer timely and proper notice of the City's initiation of the review; and
WHEREAS, each Developer has submitted a letter to the City providing information required for the annual review; and
WHEREAS, the City Manager has reviewed each Developer's submission and determined that each Developer has complied in good faith with the terms of its respective Development Agreement; and
WHEREAS, there remains adequate time for each Developer to perform its obligations under the terms of its respective Development Agreement; and WHEREAS, at its regular meeting of June 2, 2025, the City Council provided an opportunity for each Developer and members of the public to be heard regarding the Mill District DA, North Village DA and Saggio Hills Affordable Housing DA, and considered the facts as described in the staff report that support the finding of compliance made by the City Manager.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg hereby:
1. Affirms the City Manager's finding that Replay Healdsburg, LLC, Eden Mill District LP, and Mill District Unit 4 Association are in good faith substantial compliance with the terms and conditions of the Development Agreement between the City of Healdsburg, Replay Healdsburg, LLC, Eden Mill District LP, and Mill District Unit 4 Association for the Mill District project.
2. Affirms the City Manager's finding that CCS Healdsburg, LLC, Kendal at Sonoma, A Zen Inspired Community, and BHDC North Village, LLC, are in good faith substantial compliance with the terms and conditions of the Development Agreement between the City of Healdsburg, CCS Healdsburg, LLC, Kendal at Sonoma, a Zen Inspired Community, and BHDC North Village, LLC, for the North Village project.
3. Affirms the City Manager's finding that Freebird Development Company, LLC is in good faith substantial compliance with the terms and conditions of the Development Agreement between the City of Healdsburg and Freebird Development Company, LLC for the Saggio Hills Affordable Housing project.
6.F.a
Packet Pg. 117 Attachment: Resolution (4862 : Annual Review of Development Agreements) Resolution No. – 2025
4. Finds that this review satisfies the annual review of the above-referenced development agreements as required by Healdsburg Municipal Code section 17.20.050.A and Government Code section 65865.1.
PASSED AND ADOPTED by the City Council of the City of Healdsburg, County of Sonoma, State of California, this 2
nd day of June, 2025 by the following vote:
AYES: Councilmembers: ( )
NOES: Councilmembers: ( )
ABSENT: Councilmembers: ( )
ABSTAINING: Councilmembers: ( )
SO ORDERED: ATTEST:
_________________________________ ____________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.F.a
Packet Pg. 118 Attachment: Resolution (4862 : Annual Review of Development Agreements) 105B Plaza Street, Healdsburg CA 95448
707.314.0087
milldistricthealdsburg.com
[email protected]
April 28, 2025 via email only
Scott Duiven
Community Development Director
City of Healdsburg
401 Grove Street, Healdsburg CA 95448
RE: Annual Review of the Mill District Development Agreement Dear Director Duiven,
Section 7.5 of the Development Agreement between the City of Healdsburg and Replay Healdsburg, LLC (“Agreement”) stipulates the requirement of an Annual Review of the Agreement. The following information is for the Review Period between March 12, 2024 and March 11, 2025.
1. Accounting of the Fees Paid due and Due to the City of Healdsburg:
Since March 12, 2024, the total fees paid to the City is $1,613,287.82, consisting of the following breakdown:
o City Staff and Contract Staff $ 351,210.19
o Landscape and Lighting District Assessments $ 76,382.57 o Lot 4 City Staff and Contract Staff $ 74,970.61
o Lot 4 Permit Fees $ 10,160.91
o Lot 4 School Fees $ 485,111.44
o Lot 4 Park Fees $ 85,937.30
o Lot 4 Other Impact Fees $ 187,684.22
o Lot 1 City Staff & Contract Staff $ 1,001.71
o Electrical System Equipment & Staff $ 340,828.87
The following payments are currently due:
o None
2. Project Approvals that have been Applied for or Approved this Review Period:
The 4th Amendment to the Agreement had it’s second reading and was approved by the City Council in October 2024 and became effective in November 2024. Hotel on Lot 1: the Planning Commission approved the Major Design Review in August 2024.
Retail & Residential Amenity on Lot 5 Parcel A: the Planning Commission approved the Major Design Review in October 2024, and a Building Permit application was submitted in February 2025.
3. Construction Activity that has Commenced or Completed this Review Period:
The Park was completed in August 2024.
6.F.b
Packet Pg. 119 Attachment: Replay Mill District DA Annual Review (04-28-25) (4862 : Annual Review of Development Agreements) 105B Plaza Street, Healdsburg CA 95448
707.314.0087
milldistricthealdsburg.com
[email protected]
The Public Improvement project was completed in March 2025 with only limited punch list work continued into April 2025. The Public Improvements is scheduled to be on the City Council’s Consent Calendar for The City’s acceptance on 5/5/25. Lot 4 (“Canopy”) construction completed in January 2025 and the Final Certificate of Occupancy was issued on 2/6/25.
4. Compliance with Development Agreement Sections 5.1 through 5.4:
Section 5.1: Affordable Housing Units
Completed in July 2023
Section 5.2: Middle Income Units
Replay has not submitted planning applications for any future developments that contains Middle Income Units
Section 5.3: Public Improvements
See above for the Park and the Public Improvements updates.
Section 5.4: Additional Developer Contributions
Section 5.4(a) – No longer applicable.
Section 5.4(b) – The first Connectivity Fund payment of $150,000 was paid and the second installment of $250,000 will be paid within 30 days of request from The City. Section 5.4(c) – The Fire Truck payments we’re paid in full during the prior Review Period.
Section 5.4(d) – The Lighting and Landscape District and payments have been made this Review Period with the amount specified above.
5. Enforced Delays or Permitted Delays this Review Period:
There have not been any enforced delays or permitted delays as provided for under section
7.6 of the Agreement.
6. Transfer or Assignments this Review Period:
Lot 4 was Assigned to Mill District Unit 4 Association (“Canopy”) on November 5, 2024.
Sincerely,
Mike McCone
Vice President of Development
Replay Destinations
CC: Jeff Kay, City Manager
Samantha Zutler, City Attorney
Linda Ruffing, North Coast Community Planning
Paul Woodward, Replay Destinations
6.F.b
Packet Pg. 120 Attachment: Replay Mill District DA Annual Review (04-28-25) (4862 : Annual Review of Development Agreements) April 28, 2025 via email only
Scott Duiven
Community Development Director
City of Healdsburg
401 Grove Street, Healdsburg CA 95448
RE: Annual Review of the Mill District Unit 4 Association (“Canopy HOA”) Compliance with the Mill District Development Agreement
Dear Director Duiven,
Section 7.5 of the Development Agreement between the City of Healdsburg and Replay Healdsburg, LLC (“Agreement”) stipulates the requirement of an annual review of the Agreement.
This report only pertains to the sub-association known as the Canopy HOA, that on 11.5.24 was assigned the obligations of the Agreement as they pertain to Mill District Lot 4.
1. Review Period:
From November 5, 2024 to March 11, 2025.
2. Subsequent Project Approvals Applied for or Approved During the Review Period:
None
3. Construction Activity that has been Commenced or Completed during the Review Period:
Work on completion of Canopy punch list items was performed by the Project Developer, Canopy Healdsburg, LLC, during the Review Period and a Final Certificate of Occupancy was obtained on February 6, 2025.
4. Description of Compliance with Sections 5.1 through 5.4 of the Agreement:
Not Applicable
5. Description of any Forced Delay or Permitted Delay:
Not Applicable
6. Description of any Transfer or Assignments:
The Assignment and Assumption Agreement between Canopy Healdsburg, LLC and the Mill District Unit 4 Association took effect on November 5, 2024.
6.F.c
Packet Pg. 121 Attachment: Canopy HOA Mill District DA Annual Review (04-28-25) (4862 : Annual Review of Development Agreements) Sincerely,
Mike McCone,
President of the Board
Mill District Unit 4 Association
CC: Jeff Kay, City Manager
Samantha Zutler, City Attorney
Linda Ruffing, North Coast Community Planning
Ellie Fitz-Simon, Action Property Management
6.F.c
Packet Pg. 122 Attachment: Canopy HOA Mill District DA Annual Review (04-28-25) (4862 : Annual Review of Development Agreements) rrA1
EDEN
HOUSING
April 25, 2025
Community Development Director
City of Healdsburg
401 Grove Street
Healdsburg, CA 95448
Re: Annual Review of Mill District Development Agreement Dear Director Duiven,
The Partial Assignment and Assumption of the Development Agreement and Estoppel Agreement between the City of Healdsburg, Replay Healdsburg, LLC and Eden Mill District, LP, and Section 7.S{a) of the Development Agreement between the City of Healdsburg and Replay Healdsburg, LLC {"Agreement") stipulate the requirement of an annual review of the Agreement. The following information below pertains to the reporting year between January Ol, 2024 and December 31, 2024.
The following information is required to be reported:
i. The beginning and ending date of the annual review period as noted above. ii. A description of any Subsequent Project Approvals that have been applied for or approved during the applicable annual review period
Not Applicable.
iii. A description of any construction activity that has been commenced or completed during the applicable annual review period
Not Applicable.
iv. A description of compliance with sections 5.1 through 5.4 of this Agreement during the applicable annual review period
22645 Grand Street I Hayward, CA 94541 I Tel: 510-582-1460 I edenhousing.org Broker License No. 872400 A A NeighboiWiirks·
6.F.d
Packet Pg. 123 Attachment: Eden Mill District DA Annual Review (04-25-25) (4862 : Annual Review of Development Agreements)
6.F.d
Packet Pg. 124 Attachment: Eden Mill District DA Annual Review (04-25-25) (4862 : Annual Review of Development Agreements) v. A description of any enforced delay or Permitted Delay as provided for under Section 7.6 of this Agreement that occurred during the applicable annual review period.
Not applicable
vi. A description of any transfer or assignments as provided for under Section 9 of this Agreement that occurred during the applicable annual review.
Not applicable
Please contact Quyen Nguyen, Senior Asset Manager ([email protected]:
510-247-8139) or Ariana Fierro, Asset Management Analyst II ([email protected]:
510-247-8110 Ext. 8333) with any questions.
Sincerely,
Ariana Fierro
Asset Management Analyst II
6.F.d
Packet Pg. 125 Attachment: Eden Mill District DA Annual Review (04-25-25) (4862 : Annual Review of Development Agreements) CCS Healdsburg, LLC
3760 Kilroy Way, Ste 130
Long Beach, CA 90806
310.546-5781
[email protected]
[Website]
April 1, 2025
Scott Duiven
Community Development Director
City of Healdsburg
401 Grove Street
Healdsburg, CA 95448-4723
Dear Mr. Duiven,
RE: Annual Review of North Village Development Agreement Section 7.5 of the Development Agreement between the City of Healdsburg and CCS Healdsburg, LLC (“Agreement”) stipulates the requirement of an annual review of the Agreement. The following information below pertains to the reporting year between February 11, 2024 and February10, 2025.
The following information is required to be reported:
1. An accounting of the fees due and paid to the City
Since February 11, 2024, the total amount of fees paid to the City is $169,463.60 consisting of the following breakdown:
• Permit Fees and Plan Check Fees:
o Hotel Building Inspection Fees: $152,166.22
• Contract Planner, staff and City Legal: $17,297.38
2. Assignments or transfers of the Property
• None
NORTH
VILLAGE
6.F.e
Packet Pg. 126 Attachment: CCS Healdsburg No Village DA Annual Review (04-01-25) (4862 : Annual Review of Development Agreements)
3. All Construction of public improvements under this Agreement • A Subdivision Improvement Agreement was issued on July 14th, 2021. Major public improvements are complete.
• All work under the Subdivision Improvement Agreement is substantially complete pending minor corrective action for Foss Creek Pathway surface cracking and miscellaneous concrete repairs on Healdsburg Avenue.
4. Description of any subsequent project approvals that have been applied for or approved • Parcel 4 (Burbank Housing)
o Building Permit was issued for Construction on May 14, 2024 • Parcel 2
o Owner submitted Building Permit Application and Plans for Construction of 27 Townhomes January 7, 2025
5. Description of any construction activity that has been commenced or completed during the applicable annual review period
• Vertical construction for Parcel 1(Kendal at Sonoma) is complete and Certificates of Occupancy were issued for the Memory Care Wing
• Vertical construction of the hotel on Parcel 3 is 85% complete. • Vertical construction for 53 affordable apartments and retail space has commenced
6. Amendments to Agreement
No additional amendments to the Development have been requested.
Respectfully Submitted,
Debra Geiler
VP Forward Planning and Entitlements
Cc: Jeff Kay, City Manager
Linda Ruffing, Planning Consultant
Robert Miller, Lubin Olson & Niewiadomski LLP
6.F.e
Packet Pg. 127 Attachment: CCS Healdsburg No Village DA Annual Review (04-01-25) (4862 : Annual Review of Development Agreements)
6.F.f
Packet Pg. 128
Attachment: Kendal North Village DA Annual Review (04-30-25) (4862 : Annual Review of Development Agreements)
6.F.f
Packet Pg. 129
Attachment: Kendal North Village DA Annual Review (04-30-25) (4862 : Annual Review of Development Agreements)
6.F.f
Packet Pg. 130
Attachment: Kendal North Village DA Annual Review (04-30-25) (4862 : Annual Review of Development Agreements) April 30, 2025
Mr. Scott Duiven
Community Development Director
City of Healdsburg
401 Grove Street
Healdsburg, CA 95448
RE: Annual Review - North Village Development Agreement Dear Mr. Duiven,
We are in receipt of your letter dated March 24, 2025 requesting a written update regarding the status of BHDC’s affordable mixed use housing project on Parcel 4 at North Village, as required by the Development Agreement between the City of Healdsburg and CCS Healdsburg, LLC. The following summarizes the current status of the project:
• Construction began June 2024
• Original Construction completion was anticipated for 10/16/2025, however due to delays from weather and design, completion has been pushed back to 12/16/2025. • Construction progress through April 2025 includes completion of most hard scape, all utilities in place, all three buildings approaching completion of framing. • The remainder of work includes windows and exterior finishes, interior finishes and MEP lines, permanent power, landscaping and final paving.
Should you have any questions pertaining to the above, please do not hesitate to contact me.
Sincerely,
Larry Florin
Chief Executive Officer
cc: Ms. Linda Ruffing
6.F.g
Packet Pg. 131 Attachment: Burbank North Village DA Annual Review (04-30-25) (4862 : Annual Review of Development Agreements)
ANNUAL REVIEW FORM
This Annual Review Evaluation Form is submitted to the City of Healdsburg (“City”) by Freebird Development Company, LLC, a California limited liability company (“Developer”), pursuant to the requirements of California Government Code section 65865.1 regarding Developer’s good faith substantial compliance with its obligations under the Development Agreement between the City and Developer having an Effective Date of May 17, 2023 (“Development Agreement”). All terms not otherwise defined herein shall have the meanings assigned to them in the Development Agreement:
Annual Review Period: 5/17/24 to 5/17/25
Specify whether Impact fees, Processing fees, Connection fees and/or other fees due and payable have been paid during this annual review period. Through March 2025, Developer has paid the following fees this review period:
• Final Map Application - $33,176
• Building Permit Plan Review Fee Phase 1 - $70,143
• Healdsburg Electric Cost Recovery Payment - $11,655
We are anticipating additional permitting and impact fees in May 2025 in connection with the Phase I construction loan closing currently scheduled for May 2025.
Describe whether other applicable Development Agreement obligations were completed during this annual review period and, if so, specifically identify such obligations.
During the review period, Developer has secured the following competitive funding sources. • Phase 1 – Approx $21 million in State Affordable Housing and Sustainable Communities funds for the following:
o Approx $15.7 million to Developer for Phase 1
o Approx $1 million to City for multi-use trail and University Avenue sidewalk improvements
o Approx $3.4 million to Sonoma County Transit to purchase new ZEV vehicle and charging equipment, expand Route 67 including level of service, install 10 new bus shelters in Healdsburg
o $360,000 to CalVANs for 4 vanpool vehicles
o Approx $600,000 for various community programs including anti-displacement activities, workforce development, and bike advocacy
• Phase 1 - $600,000 in County Fund for Housing funds
• Phase 1 – Tax exempt bonds and 4% low income housing tax credits • Phase 2 – Approx $11.6 million in State CDBG-DR funds
6.F.h
Packet Pg. 132 Attachment: Freebird Saggio Aff Housing DA Annual Review (03-28-25) (4862 : Annual Review of Development Agreements) Additionally, Developer has applied for the final map (set to be heard by City Council in April) and building permits for Phase 1 and anticipates closing on construction financing and starting construction on Phase 1 in May 2025.
Specify whether Developer has assigned the Development Agreement, in whole or in part, or otherwise conveyed the Property or any portion thereof during this annual review period.
Developer and City have executed a Partial Assignment and Assumption of Development Agreement and Disposition and Development Agreement dated 2/1/24 with Saggio Hills Lot 14, L.P. with respect to the Phase 1 Project and a Partial Assignment and Assumption of Development Agreement and Disposition and Development Agreement dated 9/1/24 with Saggio Hills Lot 3, L.P. with respect to the Phase 2 Project.
The undersigned representative confirms that Developer is:
__X__ In good faith substantial compliance with its obligations under the Development Agreement for this annual review period.
_____ Not in good faith substantial compliance with its obligations under the Development Agreement for this annual review period, in response to which Developer is taking the actions set forth in the attachment hereto.
IN WITNESS WHEREOF, Developer has executed this Annual Review Form as of this 28th day of March, 2025.
DEVELOPER:
FREEBIRD DEVELOPMENT COMPANY,
LLC, a California limited liability company
By:
Name:
Its:
Robin Zimbler
Manager
6.F.h
Packet Pg. 133 Attachment: Freebird Saggio Aff Housing DA Annual Review (03-28-25) (4862 : Annual Review of Development Agreements)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Resolution Setting the Time and Place for Hearing Protests to Weed Abatement
PREPARED BY: Lance MacDonald, Fire Marshal/Division Chief STRATEGIC INITIATIVE(S):
Pursue Initiatives that Promote Environmental Stewardship Maintain and Improve Infrastructure and Facilities
Provide Effective Governance
Maintain and Enhance Public Health and Safety
RECOMMENDED ACTION(S):
Adopt a Resolution Declaring a Public Nuisance to Exist Within Certain Parcels in the City and Setting the Time and Place for Hearing Protests to Weed Abatement.
COMMUNITY ENGAGEMENT/OUTREACH:
The Weed Abatement Program is advertised on City social media platforms prior to the start of the weed abatement inspections. The program sets a time and place for a public hearing for the community to protest weed abatement. The program also accepts weed abatement complaints at the fire department which are followed-up by Fire Department prevention staff.
BACKGROUND:
Each year the City, as part of its annual Weed Abatement Program, inspects parcels of property for the presence of weeds, brush, and other debris that create or promote a fire hazard or nuisance. At this time, most parcels in the City have been inspected. The City Council is now being asked to declare a public nuisance on the properties identified on the attached list and set a date for a public hearing. Once this is done, the property owners will be notified of the nuisance and given 28 days to abate the nuisance or contest the notice at the scheduled hearing. If the owners fail to abate the nuisance or contest the notice within the specified time frame, the City will complete the work using its own contractors and the property owner is billed for the abatement costs.
“Weeds” as defined in Section 39561.5 of the Government Code that pertain to the City of Healdsburg properties would be:
6.G
Packet Pg. 134
• Sagebrush, chaparral, and any other brush or weeds which attain such large growth as to become, when dry, a fire menace to adjacent improved property. • Weeds which are otherwise noxious or dangerous.
• Poison oak when the conditions of growth are such as to constitute a menace to the public health.
• Dry grass, stubble, brush, litter, or other flammable material which endangers the public safety by creating a fire hazard.
Additionally, parcels within the City defined in a Fire Severity Zone (Wildland-Urban Interface Fire Area) by City Municipal Code are required to create a defensible space as defined in Government Code 51182 and Chapter 49 of the California Fire Code.
DISCUSSION/ANALYSIS:
The Weed Abatement Program follows criteria established by the Government Code for this process. It has also been found to be the most effective manner to abate hazards on private property and provide a mechanism to obtain reimbursement for delinquent payments.
ENVIRONMENTAL STEWARDSHIP:
The Weed Abatement Program reduces the risk of fire within the community by removing “weeds” as defined above that may promote the spread of fire.
ALTERNATIVES:
The Council could either discontinue the Weed Abatement Program, allowing the nuisance and fire hazards to exist or issue citations under the Fire Code section 304.1.2, which does not provide a mechanism for forced abatement or reimbursement for abatement of the property.
Either of these options would alleviate the need for setting a time and place for protesting the weed abatement.
FISCAL IMPACT:
Funds to provide abatement on properties owned by unresponsive homeowners are budgeted in the Fire Department each year. When forced abatement does occur, the property owner is billed for the contractor’s fee as well as an administrative charge to recover costs associated with staff time. If payment is not received a lien may be placed on the property and the fee added to the tax roll to be paid in conjunction with property taxes.
ENVIRONMENTAL ANALYSIS:
Pursuant to California Environmental Quality Act and Title 14, the California Code of Regulations (“CEQA Guidelines”), Section 15378 (b) (2), continued administrative actions do not qualify as a “Project”. Therefore, no further CEQA or environmental review is required.
This action is also exempt from CEQA pursuant to CEQA guideline 15308.
ATTACHMENT(S):
Resolution
Weed_Abatement_Properties (1)
6.G
Packet Pg. 135
CITY OF HEALDSBURG
RESOLUTION NO. ___-2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF HEALDSBURG DECLARING A PUBLIC NUISANCE TO
EXIST WITHIN CERTAIN PARCELS IN THE CITY OF
HEALDSBURG AND SETTING THE TIME AND PLACE
FOR HEARING PROTESTS TO WEED ABATEMENT
WHEREAS, weeds, as defined by Government Code Section 39561.5, exist upon the streets, sidewalks, and private property in the City of Healdsburg; and WHEREAS, weeds on certain parcels present a menace to public health or danger to the public safety; and
WHEREAS, there are weeds on and in front of certain parcels of real property within the City of Healdsburg; and
WHEREAS, Section 51182 of the Government Code requires the maintenance of fire breaks and other vegetation clearance activities or defensible space near structures in designated Fire Severity Zones; and
WHEREAS, by performing abatement in those areas within the city identified as Fire Severity Zones, property owners can maintain compliance with State law; and WHEREAS, the said nuisances existing upon properties described in “Exhibit A” attached to this Resolution and on file in the office of the City Clerk are found to be seasonal and recurrent nuisances within the meaning of Government Code Section 39562.1; NOW THEREFORE BE IT RESOLVED by the City Council of the City of Healdsburg as follows:
1. Weeds, as defined in Section 39561.5 of the Government Code, and the failure to meet the provisions of Section 51182 of the Government Code are hereby declared to be a public nuisance.
2. Weeds including flammable material which endangers the public safety by creating a fire hazard on private property are hereby declared to be a public nuisance.
3. The abatement of said weeds on private property is hereby ordered in accordance with Government Code: Title 4, Division 3, Part 2, Chapter 13 “Weed and Rubbish Abatement” and of and Section 51182 “Very High Fire Severity Zones” or “WildlandUrban Interface Fire Area” as defined in City Municipal Code 15.08.020, Section 4902.1.
6.G.a
Packet Pg. 136 Attachment: Resolution (4869 : Weed Abatement Resolution) Resolution No. -2025
4. Said weeds shall be abated from the parcels of real property described in said “Exhibit A” and on file in the Office of the City Clerk; and seasonal recurrent nuisances shall be further abated pursuant to Sections 39562.1 and 51182.
5. The hearing upon the foregoing Order of Abatement shall be held on June 16, 2025, at or after 6:00 P.M.
6. Pursuant to California Environmental Quality Act and Title 14, the California Code of Regulations (“CEQA Guidelines”), Section 15378 (b) (2), continued administrative actions do not qualify as a “Project”. Therefore, no further CEQA or environmental review is required. This action is also exempt from CEQA pursuant to CEQA guideline 15308.
PASSED, APPROVED AND ADOPTED by the City Council of the City of Healdsburg this 2nd day of June 2025, by the following vote:
AYES: Council members: ( )
NOES: Council members: ( )
ABSENT: Council members: ( )
ABSTAINING: Council members: ( )
SO ORDERED: ATTEST:
________________________________ __________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.G.a
Packet Pg. 137 Attachment: Resolution (4869 : Weed Abatement Resolution) Property Address
415 Grant St.
438 Piper St.
0 Palm Ave
612 Healdsburg Ave
1034 Healdsburg Ave
1115 Healdsburg Ave
1491 Healdsburg Ave
1601 Winding Creek Way
1239 Healdsburg Ave
25 Grant Ave
321 University St
517 North St
421 North St
1010 University St
413 Fitch St
710 S Fitch Mountain Rd
1211 S Fitch Mountain Rd
0 March Ave
931 Powell Ave
119 Powell Ave
911 Harold Ln
935 Harold Ln
522 Center St
1546 Sunnyvale Dr
261 Monte Vista Ave
801 March Ave
328 March Ave
310 March Ave
305 Fuchsia Way
242 Terrace Blvd
424 Sunnyvale Dr
329 Sunnyvale Dr
1635 Rosewood Dr
1620 Rosewood Dr
87 Front St
733 College St
809 Prince St
1668 Stirrup Loop
421 Tee Dr
351 Arabian Way
315 Harmon St
1671 Canyon Run
6.G.b
Packet Pg. 138 Attachment: Weed_Abatement_Properties (1) (4869 : Weed Abatement Resolution)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Agreement Amendment with Sonic.net, LLC adding Managed Dark Fiber Service to 3 North Street
PREPARED BY: Adam McKenna, IT Manager
STRATEGIC INITIATIVE(S):
Maintain and Improve Infrastructure and Facilities
RECOMMENDED ACTION(S):
Adopt a Resolution approving an amendment to the Service Agreement between the City of Healdsburg and Sonic.net, LLC, increasing the not-to-exceed amount of the Original Agreement by $42,000 to $552,000, providing that the initial term shall expire five (5) years from the date when Sonic billing begins for any Sonic installed and activated services and authorizing the City Manager to execute the amendment on behalf of the City.
COMMUNITY ENGAGEMENT/OUTREACH:
Not applicable.
BACKGROUND:
On August 15, 2022, City Council approved a five (5) year service agreement with Sonic.net, LLC (Sonic) for internet and managed Dark Fiber construction, installation, and support services (Original Agreement). On September 21, 2022, the City of Healdsburg (City) and Sonic executed the agreement. The existing agreement scope includes services that provide more robust, secure, and cost-effective fiber connectivity to the internet, along with dedicated dark fiber connections between City facilities.
DISCUSSION/ANALYSIS:
The City and Sonic have negotiated a proposed amendment (Amendment) to the Original Agreement. The Amendment will:
1. Update the Individual Fiber Segment Turn Up Sites in ‘Exhibit D’ of the Original Agreement to add managed Dark Fiber to an additional City site locate at 3 North Street (Foley Family Community Pavilion). The Amendment will also update the payment schedule in ‘Exhibit B’ of the Original Agreement to add a monthly service cost of $700,
6.H
Packet Pg. 139
thereby increasing the Original Agreement not-to-exceed amount by $42,000 to $552,000.
2. Amend the Term of the Original Agreement noting the initial term shall expire five (5) years from the date when Sonic billing begins for any Sonic installed and activated services.
Staff recommend City Council approve the proposed Amendment with Sonic.net, LLC and authorize the City Manager to execute the Amendment on behalf of the City.
ENVIRONMENTAL STEWARDSHIP:
Not applicable.
ALTERNATIVES:
The City Council could choose not to approve and authorize the City Manager to execute the proposed Amendment with Sonic. If the Council chooses not to approve the proposed Amendment, additional direction to staff is requested.
FISCAL IMPACT:
Staff is recommending the signing of the Agreement Amendment, increasing the not-to-exceed amount for Sonic internet and dark fiber implementation, and service to $552,000 over 60 months. Sufficient funds are in the 2024-26 Budget for internet and intranet communications, and future costs will be incorporated in subsequent budget years. No additional impact or increase to the budget is expected.
ENVIRONMENTAL ANALYSIS:
Pursuant to Section 15378(b)(5) of the State CEQA Guidelines, the proposed action is an administrative activity of the City that will not result in direct or indirect physical changes to the environment; and is, therefore, not a project for purposes of CEQA.
ATTACHMENT(S):
Resolution
Amendment 2 Sonic Dark Fiber Services
6.H
Packet Pg. 140
CITY OF HEALDSBURG
RESOLUTION NO. -2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG APPROVING AN AMENDMENT TO THE
SERVICE AGREEMENT BETWEEN THE CITY OF
HEALDSBURG AND SONIC.NET, LLC, AND AUTHORIZING
THE CITY MANAGER TO EXECUTE THE AMENDMENT ON
BEHALF OF THE CITY
WHEREAS, on August 15, 2022, City Council approved a five (5) year service agreement with Sonic.net, LLC (Sonic) for internet and managed Dark Fiber construction, installation, and support services (Original Agreement); and
WHEREAS, On September 21st, 2022, the City of Healdsburg (City) and Sonic executed the Original Agreement; and
WHEREAS, City and Sonic wish to amend the Individual Fiber Segment Turn Up Sites in ‘Exhibit D’ of the Original Agreement to add the site at 3 North St; and WHEREAS, City and Sonic wish to amend the payment schedule in ‘Exhibit B’ of the Original Agreement to include the monthly service cost of $700 per month for the added service site at 3 North St; and
WHEREAS, the amended payment schedule in ‘Exhibit B’ will increase the Original Agreement not to exceed amount by $42,000 to $552,000; and WHEREAS, City and Sonic wish to amend the Term of the Original Agreement to provide that the initial term shall expire five (5) years from the date when Sonic billing begins for any Sonic installed and activated services; and
WHEREAS, Pursuant to California Environmental Quality Act and Title 14, the California Code of Regulations (“CEQA Guidelines”), Section 15378(b) (5), the recommended action is an administrative activity of the City and will not result in direct or indirect physical changes in the environment and does not qualify as a “Project”. Therefore, no further CEQA or environmental review is required.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg hereby:
1. Approves an Amendment to the Original Agreement with Sonic.net, LLC executed on September 21, 2022, increasing the not to exceed amount of the Original Agreement by $42,000 to $552,000 and providing that the initial term shall expire five (5) years from the date when Sonic billing begins for any Sonic installed and activated services.
6.H.a
Packet Pg. 141 Attachment: Resolution (4872 : Authorize Amendment with Sonic.net, LLC) Resolution No. -2025
2. Authorizes the City Manager to execute the Amendment to the Original Agreement on behalf of the City.
3. Find that pursuant to California Environmental Quality Act and Title 14, the California Code of Regulations (“CEQA Guidelines”), Section 15378(b) (5), the recommended action is an administrative activity of the City and will not result in direct or indirect physical changes in the environment and does not qualify as a “Project”. Therefore, no further CEQA or environmental review is required.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Healdsburg this 2nd day of June 2025 by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAINING: Councilmembers:
SO ORDERED: ATTEST:
__________________________________ ____________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.H.a
Packet Pg. 142 Attachment: Resolution (4872 : Authorize Amendment with Sonic.net, LLC)
SECOND AMENDMENT TO SERVICE AGREEMENT
THIS SECOND AMENDMENT TO SERVICE AGREEMENT (“Amendment”) is made by and between Sonic.net, LLC hereinafter, (“Sonic”) and the CITY OF HEALDSBURG (“Customer”), and collectively referred to as (“Parties”) and shall be effective as of _________________________ for the purpose of amending that certain Service Agreement (“Original Agreement”), between the Parties signed September 21, 2022, for bi-directional dark fiber and Internet access services (“The Project”).
WHEREAS, Customer and Sonic wish to amend the Individual Fiber Segment Turn Up Sites in ‘Exhibit D’ of the Original Agreement to add the following service site:
ALOC: Foley Family Community Pavilion, 3 North Street, Healdsburg ZLOC: City Hall, 401 Grove Street, Healdsburg
WHEREAS, Customer and Sonic wish to amend the payment schedule in ‘Exhibit B’ of the Original Agreement to include the monthly service cost of $700 per month for the added service site at 3 North St; and
WHEREAS, the amended payment schedule in ‘Exhibit B’ will increase the Original Agreement not to exceed amount by $42,000 to $552,000; and
WHEREAS, Sonic shall commence billing upon the delivery of service for any and all fully installed services, including all ‘Exhibit D’ Sonic services that are fully operational and activated, on or after 5/15/2025; and
WHEREAS, Customer and Sonic wish to amend the Term of the Original Agreement to provide that the initial term shall expire five (5) years from the date when Sonic billing begins for any Sonic installed and activated services; and
WHEREAS, the legislative body of the City on _____________, by Resolution No. _______ authorized execution of this Amendment on behalf of the City in accordance with the City Municipal Code and/or other applicable law.
NOW THEREFORE, the Parties hereby agree to amend the Original Agreement as follows:
1. SCOPE OF SERVICES- the Individual Fiber Segment Turn Up Sites in ‘Exhibit D’ of the Original Agreement are hereby amended to add the following service site:
ALOC: Foley Family Community Pavilion, 3 North Street, Healdsburg ZLOC: City Hall, 401 Grove Street, Healdsburg
2. PAYMENT TERMS AND NOT TO EXCEED AMOUNT- the payment schedule in ‘Exhibit B’ of the Original Agreement is hereby amended to increase the not to exceed amount by $_______ to $_________.
3. TERM- Section 9.0 of the Original Agreement is amended to provide that the term shall expire five (5) years from the date when Sonic billing begins for any Sonic installed and activated services.
4. With respect to all other terms and conditions, the Original Agreement shall remain in full force and
6.H.b
Packet Pg. 143 Attachment: Amendment 2 Sonic Dark Fiber Services (4872 : Authorize Amendment with Sonic.net, LLC) effect.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year first above written:
City of Healdsburg, a Municipal Corporation _________________________ (Sonic) _________________________________ By: _____________________________ Jeffrey Kay, City Manager Its:
Attest:
__________________________________
Raina Allan, City Clerk
6.H.b
Packet Pg. 144 Attachment: Amendment 2 Sonic Dark Fiber Services (4872 : Authorize Amendment with Sonic.net, LLC)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Amendment of Professional Service Agreement with InfoSend, Inc.
PREPARED BY: Katie Edgar, Finance Director
STRATEGIC INITIATIVE(S):
Provide Effective Governance
RECOMMENDED ACTION(S):
Adopt a Resolution approving an amendment to the agreement between the City and InfoSend, Inc. for utility bill print, mail, and online bill payment services, increasing the not-to-exceed amount by $50,000 to $146,000, extending the term for one-year, and authorizing the City Manager to execute said agreement amendment.
COMMUNITY ENGAGEMENT/OUTREACH:
Not applicable.
BACKGROUND:
On July 1, 2023, the City entered into a Master Services Agreement with Infosend for a one-year period with a not to exceed value of $48,000 for printing and mailing of utility bills and reminder notices. On June 16, 2024, the City amended the agreement to extend the term for one year through June 30, 2025, and add an additional $48,000.
DISCUSSION/ANALYSIS:
Staff continue to seek alternatives to improve the utility billing customer experience and increase staff efficiency. The proposed amendment to the Infosend contract establishes an annual term to allow for flexibility in implementing utility billing software upgrades in the future.
The upcoming Fiscal Year 2025-26 budget includes appropriations to continue improving data management for the electric utility which is a first step to providing enhanced customer service through a future online portal that provides comprehensive utility usage data. Finance, Utility and Public Works staff are collaborating to develop a scope for future enhancements that will meet the needs of each respective department as well as the public. Staff continue to explore alternative solutions and are monitoring the Utility fund budgets for an opportunity to provide enhanced customer service.
6.I
Packet Pg. 145
ENVIRONMENTAL STEWARDSHIP:
Infosend provides electronic billing options that reduce the use of paper products and the vehicle miles traveled associated with the delivery of mail.
ALTERNATIVES:
Council could choose not to adopt the recommended resolution and direct staff to explore alternative bill printing and online bill pay solutions. This alternative is not recommended at this time as the implementation costs associated with the new software are not included in the adopted budget and additional time would be required to complete the appropriate procurement and implementation processes.
FISCAL IMPACT:
The proposed contract amendment is to extend services through June 30, 2026, and increase the contract amount by $50,000. Sufficient appropriations were included in the Fiscal Year 2025-26 Budget as operational expenses in the Electric, Water, Wastewater, and Drainage utility funds.
ENVIRONMENTAL ANALYSIS:
The proposed action is an administrative activity, which is not considered a 'project' as defined by the California Environmental Quality Act (“CEQA”) (CEQA Guidelines§15378).
Consequently, no CEQA action is required.
ATTACHMENT(S):
Resolution
6.I
Packet Pg. 146
CITY OF HEALDSBURG
RESOLUTION NO. ___-2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG APPROVING AN AMENDMENT TO THE
AGREEMENT WITH INFOSEND, INC. FOR UTILITY BILLING
SERVICES IN AN AMOUNT NOT TO EXCEED $50,000 AND
EXTENDING THE CONTRACR TERM FOR ONE YEAR
WHEREAS, on July 1, 2023, the City entered into a Master Services Agreement with Infosend, Inc. for a one-year period with a not to exceed value of $48,000; and WHEREAS, on June 16, 2024, the City amended the Master Services Agreement with Infosend, Inc. for an additional one-year period with a total not to exceed value of $96,000; and WHEREAS, staff continue to seek alternative service solutions to improve the utility billing customer experience and increase staff efficiency; and WHEREAS, the biennial budget includes appropriations to continue improving data management for the electric utility to provide future enhancements in customer usage transparency; and
WHEREAS, Finance, Utility and Public Works staff are collaborating to develop a scope for future enhancements that will meet the needs of each respective department as well as the public; and
WHEREAS, a contract extension is required to continue utility bill print, mail, and online services until an alternative is scoped, selected, and determined to be financially viable.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg does hereby authorize City Manager to execute an amendment to the agreement with Infosend, Inc. increasing the not to exceed by $50,000 and extending the term through June 30, 2026.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Healdsburg this 2nd day of June 2025, by the following vote:
AYES: Councilmembers: ( )
NOES: Councilmembers: ( )
ABSENT: Councilmembers: ( )
ABSTAINING: Councilmembers: ( )
SO ORDERED: ATTEST:
_______________________________ __________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.I.a
Packet Pg. 147 Attachment: Resolution (4874 : Amend Professional Service Agreement with Infosend)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Fire Protection Services Agreement with Northern Sonoma County Fire Protection District
PREPARED BY: Jason Boaz, Fire Chief
STRATEGIC INITIATIVE(S):
Provide Effective Governance
Maintain and Enhance Public Health and Safety
RECOMMENDED ACTION(S):
Adopt a Resolution approving an agreement with Northern Sonoma County Fire Protection District relating to fire protection services and authorizing the City Manager to execute the agreement.
COMMUNITY ENGAGEMENT/OUTREACH:
Not applicable.
BACKGROUND:
The City of Healdsburg has been providing contractual fire protection services to Zone FS-Fitch Mountain for over 30 years and Zone FS-Dry Creek Sotoyome for over 20 years under a contract with the County of Sonoma. In 2023, these territories were annexed into Northern Sonoma County Fire Protection District (NSCFPD), a fire protection district organized and operating pursuant to the California Fire Protection District Law of 1987. All contracts moving forward will be with NSCFPD.
DISCUSSION/ANALYSIS:
Northern Sonoma County Fire Protection District wishes to continue to contract with the City of Healdsburg to provide fire protection services to these areas. This entails responding to all fire, rescue and medical emergencies and potentially other non-emergency events requiring fire department services, to the areas located within Fitch Mountain and Dry Creek-Sotoyome.
Fitch Mountain includes all unincorporated areas of Fitch Mountain outside of the City of Healdsburg and generated 61 calls for service in 2024. On average, of these calls for service, 30 percent involve hazardous conditions such as fallen trees and PG&E power lines; 30 percent are
6.J
Packet Pg. 148
medical emergencies; 30 percent are public service type events including fire alarms and lift assists, and 10 percent involve fires.
Dry Creek-Sotoyome contains 65 square miles of unincorporated Sonoma County areas adjacent to the City of Healdsburg, including lower Dry Creek Valley extending to the Rio Lindo Academy, Westside Road to Sweetwater Springs and the Mill Creek area. The Dry CreekSotoyome zone generated 130 calls for service in 2024. Of these calls, approximately 50 percent involve medical emergencies; 30 percent are public service type events; 15 percent involve hazardous conditions and 5 percent involve fires.
The attached agreement enables Healdsburg to provide an additional year of contractual fire services beginning on July 1, 2025.
ENVIRONMENTAL STEWARDSHIP:
Not Applicable.
ALTERNATIVES:
The Council may choose not to provide contract fire protection services to this area of NSCFPD.
Declining approval of the agreement will eliminate the General Fund revenue source to the City of Healdsburg and diminish the level of fire protection services provided to Fitch Mountain and Dry Creek-Sotoyome areas of Northern Sonoma County Fire Protection District.
FISCAL IMPACT:
The proposed contract includes the Northern Sonoma County Fire Protection District paying the City of Healdsburg a flat fee of $200,000 for services in Fiscal Year 2025-26. The fee will be paid in two equal installments due by November 30th and April 30th respectively. The revenue from the contract was included in the Fiscal Year 2025-26 budget. There are no changes to the fee or services provided from the prior year agreement. Staff believes that the revenue received from the contract will be sufficient to cover the costs of providing the contracted services.
ENVIRONMENTAL ANALYSIS:
Pursuant to Title 14, the California Code of Regulations, Section 15378(b)(5) of the California Environmental Quality Act (“CEQA”) guidelines, the proposed action is an administrative activity of the City that will not result in direct or indirect physical changes to the environment; and therefore, is not a project for purposes of CEQA.
ATTACHMENT(S):
Resolution
FireProtectionServicesAgreement2025
6.J
Packet Pg. 149
CITY OF HEALDSBURG
RESOLUTION NO. -2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG APPROVING AND AUTHORIZING THE CITY
MANAGER TO SIGN THE AGREEMENT BETWEEN
NORTHERN SONOMA COUNTY FIRE PROTECTION
DISTRICT AND THE CITY OF HEALDSBURG RELATING TO
FIRE PROTECTION SERVICES
WHEREAS, the City of Healdsburg maintains a fire department capable of providing fire protection services; and
WHEREAS, the County of Sonoma has historically contracted with the City of Healdsburg to provide fire protection services to those areas of local responsibility not located within incorporated cities or fire protection districts; and WHEREAS, the City of Healdsburg has been providing fire protection to the Dry Creek/Sotoyome and Fitch Mountain areas for over 30 years; and WHEREAS, both areas are now part of Northern Sonoma County Fire Protection District (NSCFPD) through a recent annexation; and
WHEREAS, Northern Sonoma County Fire Protection District wishes to continue to contract with the City of Healdsburg to provide fire protection services to areas located within Fitch Mountain and Dry Creek-Sotoyome of their service area; and WHEREAS, the City of Healdsburg has the equipment and personnel and is willing to provide such services; and
WHEREAS, the term of this agreement shall be for one (1) year commencing on July 1, 2025, and expiring at midnight on June 30, 2026, unless terminated sooner, as provided in the agreement; and
WHEREAS, Northern Sonoma County Fire Protection District shall pay to the City of Healdsburg an amount equal to $200,000 for fiscal year 2025-26.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg hereby approves and authorizes the City Manager to sign an agreement between Northern Sonoma County Fire Protection District and the City of Healdsburg relating to fire protection services.
6.J.a
Packet Pg. 150 Attachment: Resolution (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection District) Resolution No. -2025
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Healdsburg this 2nd day of June 2025 by the following vote:
AYES: Councilmembers: ( )
NOES: Councilmembers: ( )
ABSENT: Councilmembers: ( )
ABSTAINING: Councilmembers: ( )
SO ORDERED: ATTEST:
______________________________ ___________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.J.a
Packet Pg. 151 Attachment: Resolution (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection District)
AGREEMENT BETWEEN THE
NORTHERN SONOMA COUNTY FIRE PROTECTION DISTRICT
AND THE
CITY OF HEALDSBURG
RELATING TO FIRE AND EMERGENCY SERVICES
This AGREEMENT is made by and between the Northern Sonoma County Fire Protection District, a fire district organized and operated pursuant to the Fire Protection District Law of 1987 (hereinafter referred to as “DISTRICT”), and the City of Healdsburg, a California municipal corporation (hereinafter referred to as “CITY”), referred to collectively as the “PARTIES,” as of July 1, 2025.
RECITALS
WHEREAS, CITY and DISTRICT have provided uncompensated assistance to each other, by request (mutual aid) or without a request and dispatched simultaneously (automatic aid) and desire to maintain continued collaboration and coordination.
WHEREAS, DISTRICT annexed areas (hereinafter referred to as “AREAS”) in southern Dry Creek Valley, Mill Creek Road, Westside Road, Bailache Avenue, and the Rio Lindo area (previously referred to as Zone FS-Dry Creek-Sotoyome) and the unincorporated area of Fitch Mountain between Healdsburg city limits and the Russian River (previously referred to as Zone FS-Fitch Mountain) effective April 6, 2023.
WHEREAS, DISTRICT now has jurisdiction over and receives tax revenues from properties located in AREAS, and is governed by an independent fire district board of directors elected by voters of AREAS.
WHEREAS, DISTRICT desires to increase emergency prevention, mitigation, risk reduction, and community preparedness in AREAS utilizing AREAS tax revenue.
WHEREAS, CITY owns unincorporated parcels within AREAS and may eventually annex portions of AREAS thereby decreasing DISTRICT tax revenue.
WHEREAS, CITY maintains a fire department capable of providing response to emergencies and is located closer than the DISTRICT to portions of the AREAS.
WHEREAS, DISTRICT desires to provide fiscal compensation and use of DISTRICT owned water tender, for the CITY to provide initial, closest resource, response to emergencies.
WHEREAS, for the purposes of this AGREEMENT, the PARTIES define “emergency” as an event that has an immediate threat to cause death, severe injury, and/or involves a fire and are generally medical emergencies, traffic accidents, rescues, and building fires.
6.J.b
Packet Pg. 152 Attachment: FireProtectionServicesAgreement2025 (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection WHEREAS, DISTRICT desires to reduce the need to provide uncompensated assistance to the CITY while the CITY is providing compensated assistance to the DISTRICT, specifically where the compensated assistance is for non-emergencies.
NOW, THEREFORE, DISTRICT and CITY mutually agree as follows:
I. The foregoing recitals are true and correct and are incorporated herein by reference.
II. CITY shall provide firefighters in place of or to augment the DISTRICT firefighters in AREAS for emergencies and non-emergencies, if firefighters are available, as determined by the CITY.
III. DISTRICT allows the CITY to utilize DISTRICT water tender for response to CITY incidents, emergencies and non-emergencies, with no compensation to the DISTRICT.
a. DISTRICT will provide insurance for water tender.
b. CITY agrees to store water tender in secure location preferably indoors and is responsible for vandalism, theft, or damage related to storage. c. CITY will provide fuel and conduct daily, weekly, or monthly checks to ensure the water tender remains in operational readiness at no cost to the DISTRICT.
d. DISTRICT will perform periodic operational readiness inspections in coordination with CITY for planning necessary repairs and preventative maintenance. DISTRICT will coordinate all repairs and pay for any costs associated by these inspections.
i. CITY will notify DISTRICT of maintenance or repairs that the CITY would like to perform, at DISTRICT’s cost.
ii. CITY will not commit the DISTRICT to costs of maintenance or repairs without prior approval from the DISTRICT.
e. DISTRICT allows the CITY to place CITY owned equipment on water tender.
f. DISTRICT reserves the right to utilize the water tender for its own emergency and non-emergency use with notification to and collaboration with the CITY.
CITY will forward any reimbursement funds generated from utilization of water tender, excluding the portion of funds necessary to compensate CITY employees for operation of the water tender, to the DISTRICT.
6.J.b
Packet Pg. 153 Attachment: FireProtectionServicesAgreement2025 (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection IV. CITY agrees to document CITY’s response to AREAS using CITY fire department reporting system as providing automatic aid to DISTRICT (FDID 49055) unless the DISTRICT is also present.
For Incidents Where DISTRICT is Not Present
a. DISTRICT will refer requests for reports to the CITY and will not maintain or retain reports completed by CITY
b. CITY may request a response from the DISTRICT to complete a report c. CITY will provide information to the DISTRICT as necessary to complete any DISTRICT required reporting or necessitating DISTRICT action such as for fire investigation, fire prevention, or risk reduction efforts d. DISTRICT will complete a report stating the CITY responded automatic aid in place of the DISTRICT
For Incidents Where DISTRICT is present
a. DISTRICT and CITY will work together to compile report information b. DISTRICT will complete a report and retain
c. DISTRICT does not require the CITY to complete a report For Incidents Where CITY Utilizes DISTRICT Water Tender for their own nonemergency or emergency a. CITY will acknowledge DISTRICT as providing automatic or mutual aid b. DISTRICT may complete a report as providing automatic or mutual aid to CITY
V. CITY agrees to reconsider amount the DISTRICT compensates CITY when annexing AREAS or when there is a large loss in property tax revenue such as from a wildfire or decline in assessed property value.
VI. CITY and DISTRICT agree to collaborate on fire prevention and wildfire risk reduction on CITY owned unincorporated parcels within AREAS.
VII. Nothing in this Agreement is intended to affect the legal liability of either party to this Agreement by imposing or requiring any standard of care different than that provided by or existing in applicable law.
a. Neither party shall have any liability for failure or refusal to furnish automatic or mutual aid, or for recalling or releasing resources in accordance with the terms of this Agreement. Neither party shall make a claim against the other for refusal to provide automatic or mutual aid.
b. No debt, liability, or obligation of one party shall be the debt, obligation, or liability of the other party. Each party shall be responsible for its own acts and/or omissions.
c. Each party shall be responsible for injuries or death to its own personnel to the extent required by law. Each party, to the extent it is at fault, shall be
6.J.b
Packet Pg. 154 Attachment: FireProtectionServicesAgreement2025 (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection responsible for damage to or loss of equipment while acting within the scope of this Agreement.
d. Each party shall procure and maintain its own cost such insurance as is required by applicable federal and state law and as may be appropriate and reasonable in its discretion, or cover its personnel, equipment, vehicles, and property, including, but not limited to, liability insurance, workers’ compensation, unemployment insurance, automobile liability and property damage. Each party may self-ensure when appropriate.
e. In lieu of and withstanding the pro rata risk allocation which might otherwise be imposed between the parties pursuant to Government Code Section 895.6, DISTRICT and CITY agree that all losses or liabilities incurred by a party shall not be shared pro rata, but instead pursuant to Government Code 895.4, each party shall full indemnify, defend and hold the other party, its elected and appointed officials, officers employees and agents, harmless from any claim, expense or cost (including court costs and reasonable attorneys’ fees), damage or liability imposed for injury (as defined in Government Code Section 810.8) occurring by reason of the negligent acts or omissions or willful misconduct of the indemnifying party, its elected and appointed officials, officers, employees, or agents, under or in connection with any work, authority or jurisdiction delegated to such party under this Agreement. Neither party, nor either party’s elected and appointed officials, officers, employees, or agents, shall be responsible for any damage or liability occurring by reason of the negligent acts or omissions or willful misconduct of the other party, its officers, employees, or agents under or in connection with any work, authority or jurisdiction delegated to such party hereunder. The parties’ obligations pursuant to this Paragraph X.e. shall survive the expiration or termination of this Agreement as to activities occurring or being carried out during the term of this Agreement in the performance of this Agreement.
VIII. This Agreement shall be for a one (1) year term, commencing on July 1, 2025, and expiring at midnight on June 30, 2026, unless terminated sooner, as herein provided.
IX. In consideration of the services described herein, DISTRICT shall pay the CITY two hundred thousand dollars ($200,000). Such sum will be paid to CITY in two installments; the first installment shall be paid before November 30 of the applicable fiscal year, and the second installment shall be paid on or before April 30 of the applicable fiscal year. This amount is a flat rate, and is not tied to the number of incidents to which the CITY responds.
X. This Agreement can be terminated for any reason with ninety (90) days written notice by one party to the other.
XI. All notices required or permitted hereunder shall be deemed sufficiently given if delivered by hand, mailed by United States mail, postage prepaid, by certified
6.J.b
Packet Pg. 155 Attachment: FireProtectionServicesAgreement2025 (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection or registered mail, or by electronic mail, addressed to the parties at the address set forth below or to such other addresses as may from time to time be designated in writing:
To CITY:
Fire Chief Jason Boaz
Healdsburg Fire Department
601 Healdsburg Avenue
Healdsburg, CA 95448
[email protected]
To DISTRICT:
Fire Chief Marshall Turbeville
Northern Sonoma County Fire Protection District
Post Office Box 217
Geyserville, CA 95441
[email protected]
XII. The parties agree to meet and confer in good faith over any issue not expressly described herein, as necessary to further the purposes of this Agreement.
XIII. If any term or provision of this Agreement is held to be illegal, invalid, or otherwise unenforceable by a court of competent jurisdiction, the remaining terms and provision of this Agreement shall continue in full force and effect.
XIV. The parties do not intend to create, and nothing in this Agreement shall be construed to create any benefit or right in any third party.
XV. This Agreement, including any exhibits attached hereto and incorporated herein, constitutes the entire agreement between the parties with respect to the subject matter hereof, and supersedes all prior agreements or understandings, oral or written, between the parties in this regard.
XVI. The parties may amend this Agreement only by writing signed by both of the Parties.
6.J.b
Packet Pg. 156 Attachment: FireProtectionServicesAgreement2025 (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection IN WITNESS WHEREOF, the parties hereto have executed this document as of the date first above written.
CITY OF HEALDSBURG NORTHERN SONOMA COUNTY
FIRE PROTECTION DISTRICT
By: ________________________ By: ________________________ Jeffrey Kay, City Manager
Date: _______________________ Date: _______________________
6.J.b
Packet Pg. 157 Attachment: FireProtectionServicesAgreement2025 (4882 : Fire Protection Services Agreement with Northern Sonoma County Fire Protection
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Agreement with Geographic Technologies Group, Inc. for GIS System Data Cleanup Phase 2A
PREPARED BY: Adam McKenna, IT Manager
STRATEGIC INITIATIVE(S):
Maintain and Improve Infrastructure and Facilities
RECOMMENDED ACTION(S):
Adopt a Resolution authorizing the City Manager to execute am agreement with Geographic Technologies Group, Inc., for Phase 2A data cleanup services in the amount of $85,552.50.
COMMUNITY ENGAGEMENT/OUTREACH:
Not applicable.
BACKGROUND
The City of Healdsburg continues to prioritize the enhancement of its Geographic Information System (GIS) infrastructure to improve municipal operations and data accuracy. Following the successful completion of Phase One, which focused on rebuilding the GIS infrastructure, the City is now ready to initiate Phase Two which is the data clean-up effort which will consist of several stages that will be referred to as Phase 2A, 2B, etc. The first of the phases, Phase 2A, targets the most critical datasets that offer the greatest immediate benefit. While this initial phase aims to resolve pressing data quality issues, subsequent phases will involve deeper engagement with departmental stakeholders and subject matter experts, along with extensive field data validation and collection activities. Staff have selected Geographic Technologies Group, Inc. (GTG) to assist staff in Phase 2A of our GIS cleanup efforts after their successful partnership through Phase One. By leveraging the vendor relationship and procurement mechanism established in Phase One, the City will benefit from continuity, cost-efficiency, and established expertise.
DISCUSSION/ANALYSIS
Phase 2A of the GIS project focuses on addressing critical data cleanup tasks to improve the accuracy, integrity, and usability of the City’s GIS databases, while also establishing processes to
6.K
Packet Pg. 158
maintain data quality going forward. It is designed to focus on datasets and tasks that provide the greatest immediate operational benefit. Activities for this phase will include:
• Domains Cleanup: Reviewing and implementing domains for the most critical fields across the City GeoDB (geodatabase) and Public Works GeoDB. • Metadata Optimization: Populating and documenting metadata for priority feature classes, including addresses, parcels, zoning, and streets to support accurate data usage and management.
• Comprehensive Review: Conducting initial reviews to identify unused or redundant fields and proposing Attribute Rules to improve data integrity.
Future phases will build upon this foundation, requiring substantial involvement from departmental stakeholders and subject matter experts to validate and further refine the data. The subsequent phases will include attribute cleanup, field data collection efforts, and expanded data validation processes to ensure all datasets meet the City's evolving needs.
Staff intend to execute the agreement with Geographic Technologies Group, Inc. through the California State Contract #5-22-70-25-133, as permitted by Section 3.24.080.8 of the City of Healdsburg Municipal Code. Purchasing the services through the State's Participating Addendum meets all requirements set forth in the City of Healdsburg's Purchasing Policy and ordinance and all requirements set forth by the State of California in regard to regional, state, and national cooperative purchasing agreements. This process confirms the City receives the lowest available pricing and meets the competitive bid process requirements.
ENVIRONMENTAL STEWARDSHIP:
Not applicable.
ALTERNATIVES:
The City Council could choose not to authorize the City Manager to sign an agreement with Geographic Technologies Group, Inc. In this case, GIS systems would continue with degraded data quality and mechanisms to control quality data entry.
FISCAL IMPACT:
Staff recommends authorizing the City Manager to execute a purchase agreement with Geographic Technologies Group, Inc., for Phase 2A data cleanup services in the amount of $85,552.50. This agreement will be funded by existing appropriations within the Fiscal Year 24/25 Adopted Budget in the Information Services Fund.
ENVIRONMENTAL ANALYSIS:
Pursuant to Section 15378(b)(5) of the State CEQA Guidelines, the proposed action is an administrative activity of the City that will not result in direct or indirect physical changes to the environment; and is, therefore, not a project for purposes of CEQA.
ATTACHMENT(S):
Resolution
Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract
6.K
Packet Pg. 159
CITY OF HEALDSBURG
RESOLUTION NO. -2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG AUTHORIZING THE CITY MANAGER TO
EXECUTE A PURCHASE AGREEMENT WITH GEOGRAPHIC
TECHNOLOGIES GROUP, INC., FOR PHASE 2A DATA
CLEANUP SERVICES IN THE AMOUNT OF $85,552.50
WHEREAS, the City continues to prioritize the enhancement of its Geographic Information System (GIS) infrastructure to improve municipal operations and data accuracy; and WHEREAS, following the successful completion of Phase One, which focused on rebuilding the GIS infrastructure, the City is now ready to initiate Phase Two; and WHEREAS, this phase represents the first stage in a comprehensive data cleanup effort, targeting the most critical datasets that offer the greatest immediate benefit; and WHEREAS, Staff have selected Geographic Technologies Group, Inc. (GTG) to assist staff in Phase Two of our GIS cleanup effort after their successful partnership throughout Phase One; and
WHEREAS, phase Two of the GIS project focuses on addressing urgent data cleanup tasks to enhance the integrity and usability of the City’s GIS databases, and ensure future data entry stays clean, representing the initial step of a larger, phased approach to comprehensive data cleanup and optimization; and
WHEREAS, Staff intends to execute the agreement with Geographic Technologies Group, Inc. through the California State Contract #5-22-70-25-133, as permitted by Section 3.24.080.8 of the City of Healdsburg Municipal Code; and
WHEREAS, staff is recommending the signing of an agreement for GIS data cleanup services in the amount of $85,552.50; and
WHEREAS, pursuant to Title 14, the California Code of Regulations, Section 15378(b)(5) of the California Environmental Quality Act (CEQA) guidelines, the proposed action is an administrative activity of the City that will not result in direct or indirect physical changes to the environment and is therefore not a project for purposes of CEQA.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg hereby:
1. Authorizes the City Manager to execute a purchase agreement with Geographic Technologies Group, Inc., for phase 2A data cleanup services in the amount of $85,552.50
6.K.a
Packet Pg. 160 Attachment: Resolution (4886 : Authorize Agreement with Geographic Technologies Group, Inc.) Resolution No. -2025
PASSED, APPROVED and ADOPTED by the City Council of the City of Healdsburg, this 2 nd
day of June 2025, by the following vote:
AYES: Councilmembers: ( )
NOES: Councilmembers: ( )
ABSENT: Councilmembers: ( )
ABSTAINING: Councilmembers: ( )
SO ORDERED: ATTEST:
_______________________________ ___________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.K.a
Packet Pg. 161 Attachment: Resolution (4886 : Authorize Agreement with Geographic Technologies Group, Inc.) Geographic Technologies Group, Inc. Contract for Services 1
CONTRACT FOR SERVICES
This CONTRACT for services entered into by and between the City of Healdsburg, hereinafter called the “CLIENT,” and Geographic Technologies Group, Inc., a North Carolina corporation of 1299 B Parkway Drive, Goldsboro, North Carolina 27534 hereinafter called “GTG:” WITNESSETH THAT:
WHEREAS, the CLIENT desires to engage GTG to provide professional consulting and technical services for the City of Healdsburg’s GIS Data Cleanup Initiative, and,
WHEREAS, the CLIENT finds that the proposed Scope of Work (Attachment A) and terms of this Contract are acceptable;
and,
WHEREAS, GTG desires to provide said services and agrees to do so for the compensation and upon the terms and conditions as hereinafter set forth, NOW, THEREFORE, the parties hereto do mutually agree as follows:
1. Employment of GTG. the CLIENT hereby engages GTG and GTG hereby agrees to perform the professional services hereinafter set forth. The intent of this Contract is to set out the general terms by which the Scope of Work, is agreed to.
2. Technical Approach. GTG shall perform, in a professional manner, the services set forth in Attachments to this Contract which outline the services, schedule, and fee.
3. Extra Services. GTG shall provide extra services, not specifically called for in the Scope of Work only upon written authorization from the CLIENT.
4. Time of Performance. GTG will commence work on or as soon as practicable after the date of execution of this contract and all work as set forth in the Scope of Work shall be
6.K.b
Packet Pg. 162 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services 2 completed within the time specified in the Scope of Work assuming the timely submission of all required scheduling of all meetings and reviews by the CLIENT. If the CLIENT requests modifications to the Scope of Work the time of performance of GTG shall be adjusted appropriately.
GTG's services under this Contract shall be considered complete at the date when the submissions for the Plan have been accepted by the CLIENT.
5. Meetings. This Contract includes attendance by GTG at meetings, as identified in the Scope of Work, to make presentations or to otherwise review the progress of the work.
6. Reports. GTG shall prepare and submit to the CLIENT reports as called for in the Scope of Work, attached hereto.
7. Compensation. In consideration of GTG performing the services, the CLIENT agrees to pay GTG for an amount not to exceed eighty-five thousand, five hundred and fifty-two dollars and 50/100 ($85,552.50) for services and tasks more fully described in the proposed Scope of Work.
7.1 Method and Timing of Payment. This contract is a “Not to Exceed Amount Contract – Hourly Services”. Remaining funding from the GIS Data Cleanup Initiative project may carry over to additional GIS tasks outside the project scope, per the CLIENT’s written request, after the project’s final acceptance. Payment by the CLIENT for the time logged for the month shall be made on a monthly basis, thirty (30) days after receipt of invoice.
8. Personnel. GTG represents that it has, or will secure at its own expense, all personnel required to perform the services under this Contract and that such personnel will be fully qualified to perform such services.
9. Responsibilities of the CLIENT. It is agreed that the CLIENT will have the following responsibilities under this Contract:
6.K.b
Packet Pg. 163 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services 3 a. The providing of all available information, data, reports, records, and maps to which the CLIENT has access and which are needed by GTG for the performance of the services provided for herein.
b. Providing assistance and cooperation for GTG in obtaining any other needed material(s) that the CLIENT does not have in its possession to complete the work as described in the Scope of Work.
c. Making available the services of the CLIENT as may be necessary to obtain information as needed to perform the work program set forth in the Scope of Work.
d. The designation of a single representative who will be authorized to make necessary decisions required on behalf of the CLIENT and will serve to provide the necessary direction and coordination for the project.
All such responsibilities shall be conducted in a timely manner and without undue delay so as not to delay GTG in the performance of its services.
10. Delays Beyond the Control of GTG. It is agreed that events that are beyond the control of GTG or the CLIENT may occur which may delay the performance of the Scope of Work.
In the event that the performance of the Scope of Work by GTG is delayed beyond its control, GTG shall notify the CLIENT of such delay and the reasons therefore, and the CLIENT may, at its discretion, extend the time of performance appropriately.
11. Dispute Resolution. The parties will attempt in good faith to resolve any controversy or claim arising out of or relating to this contract promptly by negotiation between appropriate parties who have the authority to settle the controversy.
The disputing party shall give the other party written notice of the dispute. Within ten (10) days after receipt of said notice, the receiving party shall submit to the other a written response. The notice and response shall include:
6.K.b
Packet Pg. 164 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services 4 (a) a statement of each party's position and a summary of the evidence and arguments supporting its position, and
(b) the name and title of the designated representative who will represent that party.
The executive shall meet at a mutually acceptable time and place within twenty (20) days of the date of the disputing party's notice and thereafter as often as they reasonably deem necessary to exchange relevant information and to attempt to resolve the dispute.
If the controversy or claim has not been resolved within thirty (30) days of the meeting of the appropriate parties, the parties may use other available means of dispute resolution including the courts.
12. Changes. the CLIENT or GTG may, from time to time, request modifications or changes in the Scope of Work. Such changes, including any increase or decrease in the amount of GTG's compensation, which are mutually agreed upon by and between the CLIENT and GTG, shall be incorporated in written amendments.
13. Termination of Contract. This Contract may be terminated by either the CLIENT or GTG with fourteen (14) days written notice. In the event of such termination, all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, and reports prepared by GTG shall, at the option of the CLIENT, become its property.
GTG shall be entitled to receive just and equitable compensation for work accomplished prior to the termination.
14. Assignability. This Contract shall not be assigned or transferred by either GTG or the CLIENT without the prior written consent of the other.
15. Liability and Standard of Care. GTG shall perform services for the CLIENT in a professional manner, using that degree of care and skill ordinarily exercised by consultants practicing in the same or similar locality as the project. The total liability of GTG whether in contract, tort (including negligence, whether sole or concurrent), or otherwise arising out of, connected with or resulting from the services provided pursuant to this contract shall not exceed the total fees paid for the work in question.
6.K.b
Packet Pg. 165 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services 5 the CLIENT acknowledges that GTG is a Corporation and agrees that any claim made by the CLIENT arising out of any act or omission of any director, officer, or employee of GTG in the execution or performance of this contract shall be made against GTG and not against such director, officer, or employee.
GTG will maintain the following minimum limits of insurance during the term of this agreement:
a. General Liability
Each Occurrence: $1,000,000
Fire Damage (Any one fire) $50,000
Medical Expenses (Any one person) $10,000
Personal & Adv Injury $1,000,000
General Aggregate $2,000,000
Coverage shall include contractual liability, products and completed operations, independent contractors, broad form general liability extensions, and per contract aggregate.
b. Automobile Liability – Combined Single Limit $1,000,000 c Worker’s Compensation Statutory
Each Accident $500,000
Each Disease – Each Employee $500,000
Each Disease – Policy Limit $500,000
d. Technology Errors and Omissions and Cyber Liability insurance on an occurrence or claims made basis with limits of liability not less than $5,000,000 per occurrence and $5,000,000 aggregate combined single limit. This policy shall cover GTG, all employees, and/or volunteers and all independent contractors, subcontractors and professional contractual persons hired or retained by GTG.
6.K.b
Packet Pg. 166 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services 6 IN WITNESS WHEREOF, GTG and the CLIENT have executed this Contract as of the date written below and under the laws of the State of North Carolina.
GEOGRAPHIC TECHNOLOGIES GROUP, INC.
By:
Printed Name
Title
Date
CITY OF HEALDSBURG, CA
By:
Printed Name
Title
Date
6.K.b
Packet Pg. 167 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services Attachment A Proposed Scope of Services
This project is in response to the recent major upgrade and revision of the City’s GIS platform.
GTG will support the City in a focused effort to modernize and enhance the structure, consistency, and usability of both the City and Public Works Geodatabases. This work includes implementing standardized domains, cleaning and documenting key data sets, improving data integrity, and developing sustainable procedures. This scope of work is designed to promote consistency, usability, and sustainability within the City’s GIS environment. These enhancements will support better planning, analysis, and operations across city departments. Below outlines the key tasks and deliverables involved in this engagement.
Domain Standardization (City Geodatabase)
GTG will begin by meeting with City staff to review and finalize domain assignments across the city's geodatabase. This task will include:
Identifying duplicated or inconsistent domain entries and removing or consolidating them as needed based on these meetings.
Implement the agreed-upon domains across relevant fields and perform all necessary data cleanup to ensure values align with the domain structure.
Up to three internal quality reviews will be conducted by GTG staff to ensure implementation accuracy.
Clarification meetings will be scheduled with the GIS Coordinator and other stakeholders as needed throughout this process.
Metadata Documentation (Priority City Datasets)
In support of improved documentation and data stewardship, GTG will assist the City in gathering and populating key metadata for seven priority feature classes:
Addresses
Building Footprints
Easements
Land Use
Parcels
Streets
Zoning
6.K.b
Packet Pg. 168 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services Attachment A The process will include:
Identifying appropriate data stakeholders in coordination with city staff, followed by conducting up to two meetings with each stakeholder group to collect metadata.
GTG will compile the input and review it with the City’s GIS coordinator to fill any remaining gaps.
Metadata will be populated for each feature.
Any written policy or procedure will be created outlining ongoing standards for metadata creation and updates.
Comprehensive Data Cleanup (Priority City Datasets)
Following metadata population and domain implementation, GTG will perform a two-part review and clean up of the seven priority data sets.
First, GTG will generate a field usage report and assess the fill factor of each field.
Based on the above report, GTG will perform a comprehensive data cleanup to improve completeness and consistency.
Second, GTG will identify fields that are unused or outdated and may be proposed for removal, as well as fields that could benefit from the use of attribute rules to maintain future data integrity.
GTG will deliver a report of proposed field removals and another report identifying. candidate fields for attribute rules.
Both sets of recommendations will be reviewed with the GIS Coordinator for final feedback and approval.
Domain Standardization (Public Works Geodatabase)
GTG will conduct a thorough review of the Public Works geodatabase to:
Identify fields that would benefit from standardized domains.
GTG will summarize the current values used in these fields and prepare a report for review by the City GIS Coordinator and Public Works stakeholders.
Based on feedback, a series of meetings will be held to finalize domain selections.
Once finalized, GTG will clean up existing data, implement the new domains, and complete up to three internal quality reviews.
Clarification meetings will be scheduled as necessary to confirm the intended domain values
6.K.b
Packet Pg. 169 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services Attachment A Comprehensive Data Cleanup (Public Works Utility Feature Classes) Following the domain implementation, GTG will conduct a focused review of three key public works utility data sets:
SewerStormwater
Stormwater
Water
GTG will generate a field usage and fill-factor report. This information will be used to conduct targeted data cleanup and identify fields that may no longer be necessary or useful.
GTG will assess where attribute rules may be applied to enhance data integrity.
Two deliverables will be provided:
A listing of proposed fields for removal
A listing detailing recommended attribute rules
These findings will be reviewed collaboratively with the City GIS Coordinator and other stakeholders for validation and consensus.
Documentation and SOP Review
GTG will support the development and standardization of internal processes by:
Reviewing the custom Standard Operating Procedure (SOP) for data cleanup authored by the City GIS Coordinator.
GTG will revise the SOP for clarity, expand content where needed, and apply GTG's formatting standards to ensure a professional and usable final document that supports ongoing GIS data management efforts.
6.K.b
Packet Pg. 170 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic Geographic Technologies Group, Inc. Contract for Services Attachment A Project Information LoE Cost
Phase/Line Item Project Task Details Staff/Team
Member Hourly Rate Hours Cost
Domains - City GeoDB
(Domains for the entire
database)
Meet with Greg to review findings concerning domains, and identify those to be implemented.
(May entail multiple meetings)
Sr GIS Analyst $139.00 15 $2,085.00
Perform data cleanup as needed for domains identified to be implemented. Sr GIS Analyst $139.00 95 $13,205.00 Meetings with Greg for clarifications on domain values to be applied (if needed). Sr GIS Analyst $139.00 9 $1,251.00 Clean up existing duplicated domains (_1s or similar). Sr GIS Analyst $139.00 16 $2,224.00 Implement domains as identified. Includes three internal reviews. Sr GIS Analyst $139.00 63 $8,757.00 Data Cleanup - City GeoDB
Metadata for Seven Priority
Datasets
Meet with Greg to identify stakeholders for data in the City GeoDB. Sr GIS Analyst $139.00 1.5 $208.50 Conduct up to two meetings with stakeholders to identify key metadata for 7 priority feature classes.
(May entail some homework to be done by stakeholder groups.) Datasets are:
Addresses, Building Footprints, Easements, Land Use, Parcels, Streets, and Zoning Sr GIS Analyst $139.00 3 $417.00
Meet with Greg to review metadata feedback from stakeholders and fill in remaining unknown items. Sr GIS Analyst $139.00 1.5 $208.50 Populate key metadata for priority feature classes:
Addresses, Building Footprints, Easements, Land Use, Parcels, Streets, and Zoning Sr GIS Analyst $139.00 12 $1,668.00 Provide written documentation (policy/procedure) for Metadata creation and updating. Sr GIS Analyst $139.00 12 $1,668.00
Generate report for fields used and their fill factor (after data cleanup and domains have been applied). Sr GIS Analyst $139.00 3 $417.00
6.K.b
Packet Pg. 171 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 :
Geographic Technologies Group, Inc. Contract for Services Attachment A Project Information LoE Cost
Phase/Line Item Project Task Details Staff/Team
Member Hourly Rate Hours Cost
Data Cleanup - City GeoDB
Comprehensive Review
of Seven Priority FCs
Two-part comprehensive data review:
1) Utilizing the generated report for fields used and their fill factor, perform data cleanup on the seven priority feature classes.
2) Review seven priority FCs for:
a) Fields that could be proposed for removal
b) Fields for which Attribute Rules could be utilized
Note: 7 Priority feature classes are (Addresses, Building Footprints, Easements, Land Use, Parcels, Streets, and Zoning).
Sr GIS Analyst $139.00 9 $1,251.00
During course of data cleanup, identify fields that are not being used and could be proposed for removal.
Provide report deliverable to Greg for proposed fields to be removed.
Sr GIS Analyst $139.00 2 $278.00
During the course of data cleanup, identify fields for which Attribute Rules may be utilized to improve data integrity.
Provide report deliverable to Greg concerning proposed Attribute Rules.
Sr GIS Analyst $139.00 2 $278.00
Domains - Public Works
GeoDB
(Domains for the entire
database)
Review all FCs in Public Works GeoDB and identify fields to which domains may be applied. Summarize current values in said fields, and prepare report for Greg to review.
Sr GIS Analyst $139.00 24 $3,336.00
Meet with Greg to review findings concerning domains, and identify those to be implemented.
(May entail multiple meetings.)
Sr GIS Analyst $139.00 15 $2,085.00
Perform data cleanup as needed for domains identified to be implemented. Sr GIS Analyst $139.00 72 $10,008.00 Meetings with Greg and PW stakeholders for clarifications on domain values to be applied (if needed). Sr GIS Analyst $139.00 9 $1,251.00 Implement domains as identified. Includes three internal reviews. Sr GIS Analyst $139.00 50 $6,950.00
6.K.b
Packet Pg. 172 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 :
Geographic Technologies Group, Inc. Contract for Services Attachment A Project Information LoE Cost
Phase/Line Item Project Task Details Staff/Team
Member Hourly Rate Hours Cost
Data Cleanup - Public Works
GeoDB
Comprehensive Review
of SewerStormwater,
Stormwater, & Water FDs
Generate report for fields used and their fill factor (after data cleanup and domains have been applied). Sr GIS Analyst $139.00 3 $417.00 Two-part comprehensive data review:
1) Utilizing the generated report for fields used and their fill factor, perform data cleanup.
2) Review
SewerStormwater, Stormwater, & Water FDs for:
a) Fields that could be proposed for removal
b) Fields for which Attribute Rules could be utilized
Sr GIS Analyst $139.00 56 $7,784.00
During course of data cleanup, identify fields that are not being used and could be proposed for removal.
Provide report deliverable to Greg for proposed fields to be removed.
Sr GIS Analyst $139.00 7 $973.00
During the course of data cleanup, identify fields for which Attribute Rules may be utilized to improve data integrity.
Provide report deliverable to Greg concerning proposed Attribute Rules.
Sr GIS Analyst $139.00 8 $1,112.00
Review findings about fields not being used and potential Attribute Rules with stakeholders and Greg in order to receive feedback. Sr GIS Analyst $139.00 2 $208.50 Standard Operating Procedure
(SOP) Review
Review custom SOP for data cleanup written by Greg. Add content as needed for clarity. Apply GTG formatting to SOP. Sr GIS Analyst $139.00 8 $1,112.00 SubTotal 498 $69,152.50
Project Management PM $164.00 100 $16,400.00
Total 598 $85,552.50
6.K.b
Packet Pg. 173 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 :
Geographic Technologies Group, Inc. Contract for Services Attachment A Below is a Draft schedule, estimating an average of 20 hours/week. The schedule is dependent upon staff availability, holidays, PTO, and any other anomalies. Hours may vary by week, and some tasks may overlap between staff during times, resulting in a schedule reduction. A more refined schedule will be determined upon project kickoff.
City of Healdsburg, CA – GIS Data Cleanup
2025
Jun Jul Aug Sept Oct Nov Dec
Domains – City Geodatabase
Data Cleanup – City Geodatabase Metadata (7 Datasets)
Data Cleanup – City Geodatabase Comprehensive Review
(7 Datasets)
Domains – Public Works Geodatabase
Data Cleanup – Public Works Geodatabase (3 Datasets)
Standard Operating Procedure (SOP) Review
6.K.b
Packet Pg. 174 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 :
Geographic Technologies Group, Inc. Contract for Services Attachment A GTG provides an email specifically for the CLIENT to request support, [email protected]. This email should be used by the CLIENT to obtain the most efficient response time from GTG. If any other means of communication is used, a reasonable response time cannot be guaranteed. GTG’s response times are categorized and listed below:
GTG Business Hours are defined as 8:00 AM – 5:00 PM Central Time Category Description Response Time
Time-sensitive
issue
GIS-related service outage, (e.g. web
services not broken in MilSoft, etc.) or
other outage affecting critical services
During Business Hours: 4 Business
Hours
During Off-Hours: Within 4 Hours of
the Next Business Day
* Notification must be marked as
Time Sensitive
General Support
Question
General questions, content changes,
lower level outages, or break fixes
Within 1 business day
Added
functionality
requests
Adding data, web service, or other GIS
functionality
Within 3 business days
Project
consultancy
Project-related discussions Meeting will be scheduled to determine project timeline within 3
business days
HOURLY RATES
Rates listed below are pursuant to the California State Convenience Contract #5-22-70-25- 133.
Position Classification Hourly Rate
GIS Director/Advisor $189.00
Project Manager $164.00
Enterprise Architect $160.00
Senior GIS Analyst $139.00
GIS Analyst $125.00
GIS Specialist $120.00
*Costs are fixed, fully burdened
6.K.b
Packet Pg. 175 Attachment: Attachment A - Geographic Technologies Group, Inc. Data Cleanup Contract (4886 : Authorize Agreement with Geographic
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Extension of a Professional Services Agreement with MMO Partners of Washington DC for Federal Advocacy Services, with Costs Shared by Healdsburg and Four Other Cities
PREPARED BY: Raina Allan, City Clerk
STRATEGIC INITIATIVE(S):
Provide Effective Governance
RECOMMENDED ACTION(S):
Adopt a Resolution authorizing the City Manager to approve a 12-month extension to a Professional Services Agreement for federal advocacy services with MMO Partners, increasing the not-to-exceed amount by $80,852 to $526,036, offset by an additional $73,794 in reimbursement revenue from four (4) other participating Sonoma County cities.
COMMUNITY ENGAGEMENT/OUTREACH:
Not Applicable.
BACKGROUND:
In May of 2020, the City of Healdsburg, along with the cities of Petaluma, Cotati, Rohnert Park, Sebastopol, Sonoma and Cloverdale (Partnering Cities), retained Murray, Montgomery, and O’Donnell (MMO Partners) to ensure that: cities in Sonoma County with a population below 100,000 were provided direct, flexible federal funding to offset COVID related revenue losses, monitor federal agency program guidance, provide timely COVID grant related funding announcements and analyze House and Senate COVID related legislation to determine potential impact to partnering cities.
MMO supported the City of Healdsburg and other participating cities in advocating for the American Rescue Plan Act (ARPA), which was signed into law on March 11, 2021, as well as its ensuing regulatory implementation process. Additionally, MMO has supported partnering cities in advocating for their priorities in the Infrastructure Investment and Jobs Act (IIJA), which was signed into law on November 15, 2021. MMO has also provided technical assistance to partnering cities on the Federal Appropriations Process, helped support the City of Healdsburg’s
6.L
Packet Pg. 176
projects included in the Water Resources Development Act and has assisted the City in navigating the changing federal funding situation under the current administration.
DISCUSSION/ANALYSIS:
Given the success of the partnership with MMO in advocating for needs at the federal level, the five participating cities have expressed interest in continuing the partnership with MMO for another year. MMO has proposed to continue providing federal advocacy services, including:
• Serving as an intergovernmental liaison with federal agencies, Congress, and partnering cities.
• Supporting partnering cities in identifying policy and project priorities, including support in preparing future year federal appropriation requests. • Monitoring ARPA and IIJA implementation guidance and funding opportunities. • Monitoring and providing federal grant opportunities. • Tracking federal legislation and providing technical assistance. • Monitoring and identifying opportunities in the FY 24/25 and FY 25/26 federal budgets. • Support connectivity between partnering cities, federal agency officials, and Capitol Hill staff.
• Assisting in navigating the changing federal funding situation under the current administration.
MMO has proposed keeping the cost of these services flat, with a total rate of $6,738 per month, or $80,852 for the full year. The City of Healdsburg acts as the contract administrator for the partnering cities and receives reimbursement from the partnering cities to offset their proportional cost share. The cost is split based on population and remains the same as the prior year for the partnering cities.
Costs for FY 23/24:
Proposed Costs for FY 24/25:
City Population Cost/City
Healdsburg 11,610 $ 7,057.28
Petaluma 59,760 $ 36,325.82
Cloverdale 8,760 $ 5,324.87
Sonoma 10,950 $ 6,656.09
Rohnert Park 41,930 $ 25,487.64
TOTAL 133,010 $ 80,851.70
6.L
Packet Pg. 177
Proposed Costs for FY 25/26:
City Population Cost/City
Healdsburg 11,610 $ 7,057.28
Petaluma 59,760 $ 36,325.82
Cloverdale 8,760 $ 5,324.87
Sonoma 10,950 $ 6,656.09
Rohnert Park 41,930 $ 25,487.64
TOTAL 133,010 $ 80,851.70
Partnering cities have expressed that MMO continues to have the experience, skills, and knowledge of our local area (as well as detailed knowledge of the congressional appropriations and FEMA reimbursement process) necessary to accomplish this task. The $6,738/month rate is reasonable for the work being performed, and with all five participating cities sharing in the cost allocated by population, the net cost to the City is expected to be $7,058 for the twelve-month Agreement, which would expire at the end of June 2026.
ENVIRONMENTAL STEWARDSHIP:
Not applicable.
ALTERNATIVES:
The Council may choose not to approve the resolution and direct staff to find an alternative means to support federal advocacy efforts.
FISCAL IMPACT:
Appropriations for this Professional Services Agreement are included in the adopted Fiscal Year 25/26 budget in the City Managers Department. The total proposed contract amendment cost of $80,852 will be offset by reimbursements totaling $73,794 for a net impact to the City of $7,058.
ENVIRONMENTAL ANALYSIS:
The Professional Services Agreement (“Agreement”) is not a “project” pursuant to California Environmental Quality Act (“CEQA”) Guidelines 15378(b)(5) because the Agreement for advocacy services is an organizational and administrative activity; therefore, no environmental review is required.
ATTACHMENT(S):
Resolution
6.L
Packet Pg. 178
CITY OF HEALDSBURG
RESOLUTION NO. __-2025
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG AUTHORIZING THE CITY MANAGER TO
APPROVE A 12-MONTH EXTENSION TO A PROFESSIONAL
SERVICES AGREEMENT FOR FEDERAL ADVOCACY
SERVICES WITH MMO PARTNERS, INCREASING THE
NOT-TO-EXCEED AMOUNT BY $80,852 TO $526,036,
OFFSET BY AN ADDITIONAL $73,794 IN
REIMBURSEMENT REVENUE FROM FOUR (4) OTHER
PARTICIPATING SONOMA COUNTY CITIES
WHEREAS, the COVID-19 crisis and the related Shelter-in-Place (SIP) Order(s) have significantly impacted the community, its businesses, and city government; and WHEREAS, the City has worked with five other similarly situated cities in Sonoma County (Cloverdale, Petaluma, Rohnert Park, Sebastopol and Sonoma) to align our interests in retaining Federal advocacy services to secure better COVID-related Federal assistance to offset lost revenue due to COVID-19 and the SIP Order(s); and
WHEREAS, in April 2020 the cities entered into a cost-shared contract with MMO (Murray Montgomery O’Donnell) Partners, a Washington DC-based advocacy firm with knowledge of our region, the importance of tourism to our revenues, and our collective interests; and
WHEREAS, that agreement was extended, with City Council approval in December 2020, June 2021, June of 2022, June of 2023 and June of 2024 based on the shared desire of all participating Cities to continue to receive the services being provided by MMO Partners; and WHEREAS, MMO Partners has successfully provided federal advocacy services to partnering cities during the term of the current agreement; and WHEREAS, MMO Partners has represented that that it can perform these advocacy services in accordance with the terms and conditions set forth in the City’s Professional Services Agreement; and
WHEREAS, the City and four other similarly situated cities in Sonoma County (Cloverdale, Petaluma, Rohnert Park, and Sonoma) wish to extend the services for an additional year; and
WHEREAS, the expenses relating to these services during the extension period are anticipated to be offset significantly by per capita-based payments from the five partnering cities, including Healdsburg; and
6.L.a
Packet Pg. 179 Attachment: Resolution (4893 : Professional Services Agreement Extension with MMO Partners of Washington DC) Resolution No. xx-2025
WHEREAS, the Professional Services Agreement is not a “project” pursuant to California Environmental Quality Act (“CEQA”) Guidelines 15378(b)(5) because the Professional Services Agreement for federal advocacy services is an organizational and administrative activity that will not result in direct or indirect physical changes in the environment. Therefore, no further environmental review is required.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg hereby:
1. Approves an extension of an existing professional services agreement for federal advocacy services relating to the COVID-19 crisis and the Shelter-in-Place Order(s) with MMO Partners and five participating Cities (Healdsburg, Cloverdale, Petaluma, Rohnert Park, and Sonoma).
2. Authorizes the City Manager to execute a one-year extension to the existing agreement with a not-to-exceed amount of $526,036 ($60,000 from the initial agreement, $52,500 for the first extension, $85,490. for the second extension, $85,490 for the third extension, $80,852 for the fourth extension, $80,852 for the fifth extension and $80,852 for this extension).
3. Directs the City Manager to continue the existing administrative billing method to provide for a per capita-based reimbursement of the Agreement’s cost by any participating city.
4. Finds that federal advocacy services are exempt under CEQA section 15378(b)(5).
PASSED, APPROVED AND ADOPTED, by the City Council of the City of Healdsburg, this 2nd day of June 2025 by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAINING: Councilmembers:
SO ORDERED: ATTEST:
_________________________________ ____________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
6.L.a
Packet Pg. 180 Attachment: Resolution (4893 : Professional Services Agreement Extension with MMO Partners of Washington DC)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Authorize the Mayor to appear on a City Outreach Mailer on behalf of the City Council
PREPARED BY: Raina Allan, City Clerk
STRATEGIC INITIATIVE(S):
Establish Proactive Policies/Programs to Continue to Promote Economic Diversity & Sustainable Growth
Provide Effective Governance
RECOMMENDED ACTION(S):
By motion, authorize the Mayor to provide a quote and appear on a City Outreach mailer on behalf of the entire City Council.
COMMUNITY ENGAGEMENT/OUTREACH:
Not applicable.
BACKGROUND:
On March 3, 2025, the City Council discussed holding a discussion at a future City Council meeting to explore the possibility of creating a bilingual mailer in English and Spanish, focused on outreach materials and support related to immigration policies and available resources.
Vice Mayor Herrod expressed urgency to demonstrate support for residents in our community.
Following a brief discussion, the Council agreed to agendize this topic.
On April 7, 2025, the City Council discussed the creation of the bilingual mailer. The City Council created a City Council subcommittee comprised of Mayor Mitchell and Vice Mayor Herrod to work with staff to prepare the mailer.
DISCUSSION/ANALYSIS:
The Council subcommittee and staff have been diligently working on the mailer and would like a quote from the Mayor to be included with the mailer. In order to move forward, staff recommends that the City Council authorize the Mayor to provide a quote to be included on the bilingual mailer on behalf of the City Council.
6.M
Packet Pg. 181
ENVIRONMENTAL STEWARDSHIP:
Not applicable.
ALTERNATIVES:
The City Council could choose not to authorize the Mayor to appear on the mailer on behalf of the City Council. If this alternative is selected, the quote could appear on the mailer from the City or be left off the mailer entirely.
FISCAL IMPACT:
There is no fiscal impact related to the proposed action of authorizing the Mayor to provide a quote. However, the fiscal impact of creating and mailing the document is estimated to be around $5,000-$6,000. There are sufficient appropriations included in the City Managers budget for the current Fiscal Year 24/25 to support the cost of the mailer.
ENVIRONMENTAL ANALYSIS:
Pursuant to Title 14, the California Code of Regulations, Section 15378(b)(5) of the California Environmental Quality Act (“CEQA”) guidelines, the proposed action is an administrative activity of the City that will not result in direct or indirect physical changes to the environment.
6.M
Packet Pg. 182
CITY OF HEALDSBURG
CITY COUNCIL/REDEVELOPMENT SUCCESSOR AGENCY
REGULAR MEETING MINUTES
October 21, 2024
CITY HALL COUNCIL CHAMBER
401 Grove Street, Healdsburg
.
CALL TO ORDER/ROLL CALL
Mayor/Chairperson Hagele called to order the concurrent meeting of the City Council and Redevelopment Successor Agency of the City of Healdsburg at 6:00 p.m. with the following Council Members present:
Present: Council Members/: Edwards, Herrod, Kelley, Mitchell and Mayor Hagele Board Members
Absent: Council Members/: None.
Board Members
APPROVAL OF AGENDA
On a motion by Councilmember Kelley, seconded by Councilmember Edwards, approved the October 21, 2024, City Council and Redevelopment Successor Agency meeting agenda as submitted. The motion carried on a unanimous voice vote. (Ayes 5, Noes 0, Absent – None)
REPORT ON CLOSED SESSION
Mayor Hagele reported a closed session was held prior to the meeting and there was no reportable action.
ANNOUNCEMENTS/PRESENTATIONS – COMMUNITY SERVICES DEFERRED
MAINTENANCE PROGRAM AND PROJECT UPDATE
Project Manager Campbell introduced the Community Services maintenance project and project update, noted the budget allocation was $475,000 to address various projects and presented a table outlining the projects identified to be completed. Manager Campbell provided a comprehensive overview of the completed projects, which included the Community Center Roof, Recreation Park Concession Stand, Villa Chanticleer Parking Lot Lighting, Giorgi Park Tennis Courts, Plaza Gazebo, Recreation Park Goal Posts, Recreation Park Grandstand, and the Villa Chanticleer Storage Building. Manager Campbell noted the Villa Chanticleer Entrance Gate and Skate Park decking and shade, have been deferred due to budget reallocations.
In response to Councilmember Kelley’s inquiries, Manager Campbell confirmed the actual costs incurred to complete the projects and noted the remaining funds had been reallocated.
6.N.a
Packet Pg. 183 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
Manager Campbell further reviewed the construction progress of the Foley Family Community Pavilion, including completed work, ongoing tasks, and the next steps in the project.
In response to Councilmember inquiries, Manager Campbell explained that the open space behind the pavilion will include a driveway connecting to the Duchamp Hotel, a parking lot for the hotel, and a planted buffer to separate the two buildings and confirmed the project is on track to be completed Summer 2025.
Councilmember Herrod expressed gratitude for Manager Campbell’s hard work and dedication.
CITY MANAGER REPORTS
City Manager Kay shared details about the upcoming DEA Drug Take Back Program in collaboration with the Police Department, mentioned that the Dia De Los Muertos event happening on Sunday, and noted the Public Works Department will be there to provide information about the Active Transportation Plan and concluded by announcing the availability of the Welcome Home Packet.
Mayor Hagele added that the City Manager’s update is available to subscribe online.
In response to Councilmember Kelley’s inquiry, City Clerk Allan explained the Welcome Home Packet will also be translated into Spanish.
PUBLIC COMMENTS ON ITEMS ON THE CONSENT CALENDAR AND NON
AGENDA ITEMS
Linda Cade expressed her dissatisfaction with the Chamber Forum held on October 1, 2024 and announced that she was hosting an open mic will be held at the Plaza tomorrow.
Dan Pizza expressed his dissatisfaction with Councilmember Herrod and Councilmember Kelley and read aloud remarks made by Councilmember Kelley.
CONSENT CALENDAR
On a motion by Vice Mayor Mitchell, seconded by Councilmember Edwards, approved the Consent Calendar as follows:
A. REVIEW AND ATTEST TO THE VERACITY OF THE 2023 CALENDAR YEAR
POWER SOURCE DISCLOSURE REPORT AND ATTESTATION
6.N.a
Packet Pg. 184 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
Adopted Resolution No. 121-2024 titled, “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HEALDSBURG ATTESTING TO THE VERACITY OF THE 2023
POWER SOURCE DISCLOSURE AND ASSOCIATED POWER CONTENT LABEL
AND DIRECTING STAFF TO SUBMIT THE REPORT TO THE CALIFORNIA ENERGY COMMISSION.” (Ayes 4, Noes - Kelley, Absent – None)
B. ORDINANCE APPROVING FOURTH AMENDMENT TO THE DEVELOPMENT
AGREEMENT BETWEEN THE CITY OF HEALDSBURG AND REPLAY
HEALDSBURG, LLC
Adopted Ordinance No. 1244 titled, “AN ORDINANCE OF THE CITY COUNCIL OF THE
CITY OF HEALDSBURG APPROVING A FOURTH AMENDMENT TO THE
DEVELOPMENT AGREEMENT (DA 2018-01.04) BY AND BETWEEN THE CITY OF
HEALDSBURG AND REPLAY HEALDSBURG, LLC FOR THE MILL DISTRICT PROJECT.” (Ayes 4, Noes - Kelley, Absent – None)
C. A PROFESSIONAL SERVICES AGREEMENT WITH UTILITY DESIGN
SERVICES, LLC
Adopted Resolution No. 122-2024 titled, “A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF HEALDSBURG APPROVING A PROFESSIONAL SERVICES
AGREEMENT WITH UTILITY DESIGN SERVICES, LLC TO PROVIDE UTILITY DESIGN SERVICES RELATED TO THE CITY’S ELECTRIC UTILITY FOR AN AMOUNT NOT TO EXCEED $94,850.” (Ayes 4, Noes - Kelley, Absent – None) D. ACCEPTANCE OF THE FITCH MOUNTAIN PUBLIC ACCESS IMPROVEMENTS
PROJECT
Adopted Resolution No. 123-2024 titled, “A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF HEALDSBURG ACCEPTING THE FITCH MOUNTAIN PUBLIC
ACCESS IMPROVEMENTS PROJECT AS COMPLETE AND AUTHORIZING STAFF TO FILE A NOTICE OF COMPLETION WITH THE COUNTY RECORDER'S OFFICE.” (Ayes 4, Noes - Kelley, Absent – None)
The motion to approve the Consent Calendar as above carried on a roll call vote with Councilmember Kelley dissenting. (Ayes 4, Noes - Kelley, Absent – None)
PUBLIC HEARINGS
None.
6.N.a
Packet Pg. 185 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
OLD BUSINESS
None.
NEW BUSINESS – SAGGIO HILLS DEVELOPMENT PARK NAMING
Mayor Hagele recused himself from this item as he lives within 500 feet of the property.
Councilmember Kelley asked for clarification from City Attorney Zutler if she should recuse herself from this item due to potentially being within 500 feet of the property.
Following a brief recess, City Attorney Zutler clarified that Councilmember Kelley’s property is outside of the 500-foot buffer.
Community Services Director Themig stated the action this evening was to receive a recommendation from the Parks and Recreation Commission for proposed names for the Saggio Hills Development Park and adopt a resolution naming the park. Director Themig recognized the individuals involved in the park naming process, shared background information on the naming process and reviewed the Saggio Hills Development Park Master Plan.
Director Themig further reviewed the objectives, implementation plan and additional elements of the Park Naming Policy, noted Council's direction from December 19, 2022 City Council meeting and provided details on recent naming processes. Additionally, Director Themig provided information on the naming process conducted for the Saggio Hills Development Park, presented a list of park naming submissions, noted the submissions moved forward by the naming committee for further research by Holly Hoods and shared the four potential park names recommended to move forward by the Parks and Recreation Commission.
Holly Hoods Healdsburg Museum Director, provided a detailed history of each naming proposal, including “Pomo-Wappo Park,” “Smith Robinson Park,” “Parque De Luna,” and “Laura Fish Somersal Park.”
Public Comment
Abel De Luna Jr. expressed gratitude for the consideration of his father’s name in the park naming proposal. He reflected on his father's many accomplishments and shared his belief that honoring him would be a meaningful representation of the Hispanic community.
Lorenzo Sandoval reflected on his time working with Abel De Luna.
Yolanda Somersal, great-granddaughter of Laura Fish Somersal, spoke about the significance of naming the park after her great-grandmother. She emphasized Laura’s commitment to preserving
6.N.a
Packet Pg. 186 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
and sharing Native American culture, noting how proud Laura was of her heritage and how deeply she enjoyed connecting with the community.
A relative of Laura Fish Somersal shared how Laura had passed on Native American cultural traditions and teachings, emphasizing the importance of that legacy.
Frank Gonzales shared his experiences gathering materials and making baskets with Laura Fish Somersal and expressed gratitude for her being considered in the naming process.
Yolanda Dorene Smith voiced her support for naming the park in honor of Laura Fish Somersal.
Linda Cade acknowledged the worthiness of all naming proposals and reflected on the personal impact some of the individuals had on her family. Ms. Cade expressed support for naming the park either Pomo-Wappo or Laura Fish Somersal and inquired whether there might be opportunities to honor the other proposed names at different locations.
Angelica Smith expressed support for naming the park after Laura Fish Somersal and emphasized the positive impact it would have on the community.
Jeff Navarro voiced his support for naming the park after Abel De Luna and reflected on the meaningful contributions Abel made to the community.
Leslie Macias thanked Abel De Luna for his empathy and love for the community and urged Council to consider naming the park after him.
Sherry Smith Ferry expressed support for naming the park in honor of Laura Fish Somersal, reflected on the lack of Native American representation she experienced growing up in Healdsburg and emphasized the importance of visibility and cultural preservation. Ms. Smith Ferry shared a quote from Laura’s niece, highlighting Laura’s talent in basket weaving and her love for her heritage.
Miriam Gomez voiced her support for Abel De Luna, recalling her time working with him at his radio station and spoke of the support she received from Mr. De Luna, emphasizing the impact he had on her life and the community.
Ivan Jacobo expressed support for naming the park after Abel De Luna, emphasizing his significant contributions to the Hispanic community. Mr. Jacobo suggested that portions of the park be dedicated to the other individuals who were nominated if an alternate name is selected.
Shane McCloud expressed support for Laura Fish Somersal and reflected on the legacy she has left behind.
6.N.a
Packet Pg. 187 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
Member of the Community expressed support for naming the park after Laura Fish Somersal and shared a personal story about a park named in honor of his uncle. He emphasized the importance of visibility, noting that there are very few public spaces named after Native American individuals.
Clarita voiced her support for naming the park in honor of Abel De Luna, reflected on her time working with him at his radio station and highlighted the strong sense of community he fosters.
Fred Peña expressed his support for Abel De Luna and reflected on his personal upbringing in Healdsburg and spoke to the meaningful and lasting impact Mr. De Luna has had on the community and his family.
Sara Bittner expressed support for naming the park after Laura Fish Somersal, emphasizing that doing so would honor both the legacy of Laura Fish Somersal and Native American culture.
Martha Perez shared her personal experience on living and working in Healdsburg, expressing that the park should be named after Abel De Luna as a tribute to his many years of hard work and dedication to the community.
Chris Wright expressed support for naming the park after Laura Fish Somersal and reflected on her importance to the tribe and her lasting impact on the people.
Jack Pollard expressed support for naming the park after Laura Fish Somersal, noting that only two parks currently honor Native American individuals and expressed a belief that naming the park after Laura Fish Somersal would be a meaningful step toward recognizing Native American history and culture.
Council Comments
Councilmember Edwards acknowledged the limited recognition of Native Tribes in the community and expressed support for the Parks and Recreation Commission’s recommendation of naming the park after Laura Fish Somersal.
Councilmember Herrod recognized the difficulty of the decision and expressed gratitude to Holly Hoods for providing valuable historical context, he thanked the Parks and Recreation Commission, particularly Commissioner Conklin and Commissioner Thwaites, for their thoughtful work, as well as the public for their active participation and the insights they shared.
Councilmember Herrod noted Healdsburg’s underrepresentation of both Hispanic and Native American communities and expressed his support for naming the Park after Abel De Luna.
Councilmember Kelley thanked the community for their thoughtful nominations, commended Holly Hoods for her in-depth historical research, expressed appreciation to Commissioner Conklin, Commissioner Thwaites, and the Parks and Recreation Commission for their work.
6.N.a
Packet Pg. 188 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
Councilmember Kelley acknowledged the diverse voices in the room and expressed gratitude to those who shared their personal stories and expressed support for naming the park after Laura Fish Somersal.
Vice Mayor Mitchell expressed appreciation for the Council’s decision to amend the naming policy to allow recognition of living individuals, noting gratitude that Abel De Luna now has the opportunity to be honored. Vice Mayor Mitchell echoed the sentiments of her fellow councilmembers, recognized Abel De Luna’s lasting impact on the Hispanic community, expressed support for naming the park in Mr. De Luna’s honor and requested that staff explore future opportunities to recognize Laura Fish Somersal in a meaningful way.
In response to Council’s inquiries, City Attorney Zutler clarified that no formal decision has been made regarding the park’s name, as the Council remains at a split vote.
City Manager Kay added that we echo the sentiments of the Council and will most certainly keep the door open for more opportunities to recognize other nominees and encouraged the council to deliberate further and come to a majority vote.
Councilmember Edwards acknowledged the difficulty of the decision and proposed the idea of naming different sections of the park after various individuals to honor multiple contributions.
Vice Mayor Mitchell shared that it was heartwarming to witness the community coming together with mutual respect and thoughtful engagement.
Councilmember Herrod emphasized the Council’s responsibility to move forward with a name for the park, and suggested exploring additional community spaces that could carry meaningful acknowledgments.
Councilmember Kelley expressed appreciation for Vice Mayor Mitchell’s comments regarding the amended naming policy and thanked Councilmember Herrod for identifying other community assets that could be considered for future recognition. Councilmember Kelley expressed gratitude for the heartfelt stories and support from the community honoring Abel De Luna, emphasized the importance of building a lasting partnership with Native American communities and ensuring their presence and history are permanently and meaningfully represented in Healdsburg.
Vice Mayor Mitchell changed her vote in support of naming the park after Laura Fish Somersal and directed staff to identify a significant location in Healdsburg that could be named in honor of Abel De Luna.
Councilmember Herrod also changed his vote, expressed heartfelt gratitude to Mr. De Luna and reaffirmed the City’s commitment to honoring the Latino community and personally thanked Mr.
De Luna for his presence and lifelong contributions.
6.N.a
Packet Pg. 189 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
Councilmember Kelley inquired if there was interest from Council in naming the Community Center after Abel De Luna.
After brief discussion, there was Council consensus to move forward with bringing back a Resolution to name the Community Center in honor of Abel De Luna.
On a motion by Councilmember Kelley, seconded by Councilmember Herrod, adopted Resolution No. 124-2024, titled “A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF HEALDSBURG NAMING THE SAGGIO HILLS DEVELOPMENT PARK THE LAURA FISH SOMERSAL PARK”, with the changes read into the record by City Attorney Zutler. The motion carried on a roll call vote with Mayor Hagele abstaining. (Ayes 4, Noes 0, Absent 0, Abstaining – Mayor Hagele)
Mayor Hagele rejoined the meeting at this time.
NEW BUSINESS – APPOINT A COUNCIL SUBCOMMITTEE TO INTERVIEW ARTS
AND CULTURE COMMISSION APPLICANTS
City Clerk Allan stated the recommended action for this evening is to appoint a Council subcommittee to interview the Arts and Culture Commission applicants, provided information on the application deadline, outlined the timeline for interviews, and noted when appointments to the Commission will be made.
There were no public comments on this item.
Vice Mayor Mitchell nominated Mayor Hagele and Councilmember Herrod to serve on the subcommittee.
In response to Councilmember Kelley’s inquiry, City Clerk Allan confirmed that three applications have been submitted for the Arts and Culture Commission to date.
Councilmember Kelley expressed interest in participating on the subcommittee.
On a motion by Vice Mayor Mitchell, seconded by Councilmember Edwards, appointed Mayor Hagele and Councilmember Herrod to interview the applicants for the Arts and Culture Commission. The motion carried on a roll call vote with Councilmember Kelley dissenting. (Ayes 4, Noes - Kelley, Absent 0)
Mayor Hagele asked whether the Council had specific questions they would like to include in the interview process.
Council discussion ensued regarding the qualities of an ideal candidate for the Arts and Culture Commission, emphasized the importance of diversity, familiarity with City policies, active
6.N.a
Packet Pg. 190 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025) City Council/RSA Regular Meeting Minutes
October 21, 2024
participation in City and community events, the ability to collaborate effectively with the Council, and a clear understanding of the Commission’s responsibilities.
COUNCIL REPORTS ON MATTERS OF INTEREST OCCURRING SINCE PREVIOUS
REGULAR MEETING/EXPENSE REIMBURSEMENT REPORTS
Councilmember Edwards reported he saw the new police vehicle, attended the Solful Ribbon Cutting event, Healdsburg Elementary School Fall Event, and Conservation Corps of the North Bay meeting.
Councilmember Herrod reported he attended the Generation Housing Summit, Senator McGuire’s fundraiser, and was one of the Hall-O-Ween dog costume contest judges.
Vice Mayor Mitchell reported she attended the Hall-O-Ween pet parade, the Mayor’s and Councilmember’s Dinner, Housing Presentation with Director Sotomayor at the Senior Center, and gave an update to the Parks and Recreation Commission at their last meeting.
Councilmember Kelley reported she attended Walk and Roll to School Day, National Night Out, a Film Screening with First 5, Northern Sonoma County Air Pollution Control District meeting, and the Wellness Center convening.
Mayor Hagele reported he attended a Housing Presentation with Director Sotomayor at the Senior Center, Mayor and Councilmember’s dinner, Solful Ribbon Cutting event, and the Multicultural Wellness Center. Additionally, he announced he will be speaking to 2nd graders at Healdsburg Elementary School.
WRITTEN COMMUNICATIONS
None.
ADJOURNMENT
There being no further City Council/Redevelopment Successor Agency business to discuss, the meeting was adjourned at approximately 8:35 p.m.
APPROVED: ATTEST:
_________________________________ __________________________________ David Hagele, Mayor Raina Allan, City Clerk
6.N.a
Packet Pg. 191 Attachment: October 21, 2024 Regular Meeting Minutes (4881 : Approval of Minutes - June 2, 2025)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Adoption of Fiscal Year 25-26 City Council Goals PREPARED BY: April Mitts, Assistant City Manager
STRATEGIC INITIATIVE(S):
Establish Proactive Policies/Programs to Continue to Promote Economic Diversity & Sustainable Growth
Pursue Initiatives that Promote Environmental Stewardship Expand Affordable Housing Opportunities
Maintain and Improve Infrastructure and Facilities
Provide Effective Governance
Maintain and Enhance Public Health and Safety
Provide Resident-Driven Community Services
RECOMMENDED ACTION(S):
By motion, approve the City Council Goals for Fiscal Year 25-26 COMMUNITY ENGAGEMENT/OUTREACH:
The City Council held a goal setting workshop on April 18, 2025, at Healdsburg Golf Club at Tayman Park Clubhouse. The workshop was open to the public and included multiple opportunities for public comment.
BACKGROUND:
The City Council adopted the City of Healdsburg’s Strategic Plan, “Foundation for a Strong Community,” on December 16, 2019, and runs from 2020-2025. At the time the Strategic Plan was adopted, it was determined that Council would evaluate their goals annually in conjunction with the fiscal year to better match resources with Council priorities.
At the outset of the goal setting process, staff used the adopted Fiscal Year (FY) 24-25 City Council Goals as a starting point and the facilitator, Cathy Capriola from MRG, a consulting firm specializing in local government services, met with Council individually.
On April 18, 2025, the Healdsburg City Council held a full-day retreat to review and establish the City’s goals for FY 25-26. The session was facilitated by MRG, which was engaged to
8.A
Packet Pg. 192
support the City’s annual goal setting process. The development of the FY 25-26 goals involved the following steps:
1. Review of Current Goals
2. Identification of New Projects
3. Councilmember Input and Deliberation
4. Alignment with Strategic Goals
DISCUSSION/ANALYSIS:
The goals agreed upon at the April 18th meeting are reflected in the attached document with the exception of the Environmental Stewardship goal related to the Aquifer Storage and Recovery (ASR) wells. This goal was removed per City Council direction on May 5, 2025, due to lack of funding. Staff will continue to seek funding and update the Council if opportunities arise.
In total, there are 44 projects proposed as goals for the upcoming fiscal year, spread across seven Strategic Initiatives, which are unchanged from recent years.
Staff recommends that the Council approve the City Council goals for FY 25-26.
ENVIRONMENTAL STEWARDSHIP:
Not Applicable.
ALTERNATIVES:
The City Council may add, delete, or modify the proposed goals and/or outcomes.
FISCAL IMPACT:
The attached document includes a column indicating if additional funding is required. Most goals require little or no new funding, as they involve redirecting staff time or are already included in the FY 24-25 and FY 25-26 budgets. Some capital improvement projects are funded but may need more resources depending on bid results. For the projects marked “TBD,” further analysis is needed, and staff will return to City Council with funding proposals, if necessary.
ENVIRONMENTAL ANALYSIS:
Pursuant to Title 14, the California Code of Regulations, Section 15378(b)(5) of the California Environmental Quality Act (“CEQA”) guidelines, the proposed action is an administrative activity of the City hall that will not result in direct or indirect physical changes to the environment.
ATTACHMENT(S):
FY 25-26 Goal Setting - Retreat Report
8.A
Packet Pg. 193
1 | Page
Fiscal Year 25-26 Goals for City of Healdsburg
Report from the April 18th Goal Setting Council Retreat On April 18, 2025, the Healdsburg City Council held a full-day retreat to review and establish the City’s goals for Fiscal Year (FY) 25-26. The session was facilitated by MRG, a consulting firm specializing in local government services, which was engaged to support the City’s annual goal setting process. The development of the FY 2025/2026 Goals involved the following steps:
1. Review of Current Goals:
City staff reviewed the FY 24-25 Goals, removing projects that have been completed or are on track to be completed by summer 2025. Several ongoing projects were refined to provide greater specificity or adjusted to reflect a more realistic timeline for completion in the coming year.
2. Identification of New Projects:
Staff proposed new projects based on emerging opportunities, organizational and community needs, and external requirements. In some cases, these projects were initiated based on prior Council direction to revisit or explore specific topics during the goal setting process. All recommended projects were compiled into a draft list of FY 25-26 Goals, accompanied by brief descriptions to provide context. This draft was reviewed by the City Council during the Goal Setting Retreat.
3. Councilmember Input and Deliberation:
The facilitator collected input from individual Council Members on additional goals they wished to propose. These ideas were included in the agenda packet that was published before the April 18th retreat.
During the retreat, Council Members discussed these ideas collaboratively. Some proposed projects were incorporated into the final draft, others were revised or removed based on discussion, and some were not advanced by majority consensus.
4. Alignment with Strategic Goals:
The finalized projects have been organized according to the City of Healdsburg’s seven Strategic Goals, as illustrated in the diagram below.
The proposed FY 25-26 Goals are now presented for formal review and adoption by the City Council.
COMMUNITY
SERVICES
EFFECTIVE
GOVERNANCE
PUBLIC HEALTH
& SAFETY
AFFORDABLE
HOUSING
ECONOMIC
DIVERSITY &
SUSTAINBLE GROWTH
ENVIRONMENTAL
STEWARDSHIP
HEALDSBURG – STRATEGIC GOALS
INFRASTRUCTURE & FACILITIES
8.A.a
Packet Pg. 194 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals) 2 | Page
PROPOSED FY 25-26 Goals
Goal Description Funding?
ECONOMIC DIVERSITY & SUSTAINABLE GROWTH
Housing Element Land Use
Code Updates (Density Bonus
Ordinance, SB 9 Ordinance, SB
684 & SB 1123 Ordinance)
The Housing Element calls for amendments to the City’s Land Use Code that expand housing development capacity and reduce constraints, including increasing density. Recent changes in State law mandate opportunities for infill development at higher densities which need to be incorporated into the Land Use Code.
Minimal
Station Area Specific Plan –
Planning Grant
The City has been awarded a $1.13M grant to plan for increased housing, employment, and multi-modal connectivity within ½ mile of the planned SMART station, including the South Entry Area. Anticipated to be a 3-year planning effort with significant public outreach and engagement. Work for the upcoming year would be consultant selection and project launch.
No
Objective Design Standards Changes in State housing law limit discretionary review, such as design review, of certain housing projects. Objective Design Standards are guidelines that involve no subjective judgment by a public official and can help ensure that projects meet community design goals.
Minimal
2025 CA Building Code
Update/Adoption
The triennial update of the CA Building Code must be adopted prior to January 1, 2026. The 2025 California building code update, primarily focuses on energy efficiency, mandates increased use of heat pumps in new homes and certain
commercial buildings, aiming to reduce greenhouse gas
emissions and save energy costs.
The CMS includes measure BE-2.2 requiring revisiting the City’s need for a building electrification ordinance at each building code cycle update. Additionally, during adoption of the 2025 Building Code the City Council could consider adopting portions of the CalGreen code to further promote energy efficiency within development.
No
Update Parklet Program for
2026 and Beyond
The current licenses for parklets will expire early in January 2026.
Based on City Council direction, staff will update the program guidelines to address administrative issues and policy objectives, and complete new license agreements with businesses that wish to continue with the program.
No
Host Meeting on Economic
Trends
The City will host a meeting with key economic stakeholders to discuss economic trends, potentially in partnership with the Chamber.
No
ENVIRONMENTAL STEWARDSHIP *From Climate Mobilization Study (CMS) Update of Tree Ordinances –
Protection & List*
The Climate Mobilization Strategy Action CS-1.2 calls for the development of a new Tree Protection Ordinance to include protection for native and heritage trees. In addition, the CMS called an updated Recommended Tree List that better reflects Healdsburg’s climate and trees appropriate for planting along rights-of-way that won’t damage sidewalks.
No
Renewable Energy
Procurement Plan*
CMS measure BE-1.1 and BE-1.2 include actions to formulate renewable energy procurement plan based upon forecasted energy needs due to building and transportation electrification.
No
8.A.a
Packet Pg. 195 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals) 3 | Page
Water Bottle Filling Station Install water bottle filling stations at Little League Field and Rec Park.
TBD
AFFORDABLE HOUSING
Inclusionary Housing
Ordinance Update – Update
In-lieu Fee for Smaller
Projects
Update in-lieu fee for smaller projects including the definition of smaller projects to decrease cost barriers for small infill housing projects.
No
Support Permitting Process
for Saggio Hills Affordable
Housing & 155 Dry Creek
Affordable Housing
Assist with processing and facilitating the permitting process for these key City-sponsored affordable housing projects to commence construction.
No
Facilitate the Exploration of a
Community Housing Land
Trust
Support the development of a private Housing Land Trust to secure land for future RHNA compliance and to increase
moderate to middle-income housing opportunities through land banking and other programs.
Not at this
stage
Complete Renovations of
Victory Studios & Apartments
Oversee the finalization of renovations to the City-owned Victory Studios & Apartments to provide an improved quality of life for tenants and to address neighborhood integration.
No, grant
funded
Prioritize Options to
Eliminate/Reduce Barriers to
Encourage Housing
Development
Prioritize options to eliminate/reduce barriers (costs, fees, streamlining, policies) to encourage housing development within our current guidelines.
No
INFRASTRUCTURE & FACILITIES *From Climate Mobilization Study (CMS)
PARKS / LANDSCAPING / STREETS / BIKES / PEDESTRIAN
Healdsburg Avenue Complete
Street Project – Design*
Complete design process for this project which will reduce the vehicle lanes to provide protected bike lanes and improve safety for all users from Powell to City limits.
Not now.
Funding
shortfall is
possible.
Grove Street Neighborhood
Plan – Begin Construction*
Initiate construction of this project which will include curb gutter and sidewalk for project limits from grant to Dry Creek, as well as making other improvements for all users.
Not now.
Funding
shortfall is
possible.
Ward Street Neighborhood
Plan – Infrastructure Planning
Determine scope of improvements on Adeline, Ward, Palm, and South University to bring this neighborhood up to expected standards for pavement condition, drainage, and ADA compliant walkways.
No
Active Transportation Plan
Implementation
Discuss possible low construction cost project to repurpose parking on Front Street from Healdsburg Avenue to the entrance to Foss Creek pathway.
No
Complete March Avenue
Pavement Rehabilitation &
Enhanced Crossing @ Lupine
& Prentice*
The project will reconstruct the pavement on this heavily used collector street and will also make pedestrian improvements.
No
Explore Revenue for
Infrastructure & Road Repair
Identify & explore sources for revenue for infrastructure and roadway repair needs.
No
WATER
Dry Creek Well Field –
Construction Drawings
This project restores and improves pumping capacity at the Dry Creek well field located within the City’s Corporation Yard in order to source more water from Lake Sonoma and lessen the City exposure to future droughts. This effort will help mitigate shrinking water supplies within the Upper Russian River directly Yes
8.A.a
Packet Pg. 196 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals) 4 | Page
related to the loss of the Potter Valley Project. Development of the construction drawings and documents is not currently funded and will require appropriation of additional CIP funds.
Sonoma Water Purchase
Agreement for Additional
Water
The current water supply agreement with Sonoma Water expires at the end of 2025. Renewal of this contract and purchasing of additional stored water will increase the City drought resiliency, especially when considering the loss of the Potter Valley Project.
No
INFRASTRUCTURE
Evaluate and Implement
Flood Monitoring Technology
Plan locations for stream gauges, cameras, and rain gauges to better track and predict flooding.
Minimal at this
stage.
EFFECTIVE GOVERNANCE
Enhance City Communication
& Outreach to Build Public
Trust
Build public trust via enhanced City communication and proactive public outreach.
TBD
Update the Council’s
Governance Protocols
Update the City Council’s Governance Protocol. Conduct a comprehensive review and look at best practices from other agencies. Also include the following items:
Update to reflect districts, including holding community meetings in districts
Review City Council policy for taking positions on
legislation and ballot measures
Determine whether to re-establish Zoom comments for
Council/Commission meetings
No
Constituent Request System Improve system to manage constituent requests and issues. TBD Council Chamber A/V
Infrastructure
Improvements/Upgrades –
Phase 1.
Improve Council Chamber A/V Infrastructure
Improvements/Upgrades – Phase 1.
TBD
PUBLIC HEALTH & SAFETY
FIRE
Fire Department Standards of
Cover Study
A contract was awarded at the April 8th City Council meeting.
This project will also include a Community Risk Assessment and a Strategic Plan for the Fire Department. It is expected to take roughly six months to complete.
No
Fit and Finish Fire Substation After completing construction, complete the furnishing of the station and relocate equipment so that the station will be ready to be upstaffed during Red Flag Warnings and High Fire Danger days.
No
Roll-out of Wildfire Mitigation
Program – Parcel-to-Parcel
Inspections
Software has been selected for the Parcel-to-Parcel Wildfire Mitigation Assessment Program, with the intent for future use and funding through countywide Measure H. Program buildout and launch targeted for late spring to early summer.
No
Development of a Community
Chipper Program & Funding
Exploration
Initial staff goal is to launch the program this summer. The longterm objective is to secure funding for the program through Measure H via FireSafe Sonoma.
No
City Open Space Wildfire
Management Plan
Continue collaborative wildfire mitigation work with the Community Services Department on both the Fitch Mountain Open Space Preserve (FMOSP) and Healdsburg Ridge Open
Space Preserve (HROSP). Develop shared budget and strategy to continue fire fuel reduction work.
No
8.A.a
Packet Pg. 197 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals) 5 | Page
POLICE
Police Recruitment &
Retention Initiative
Develop a structured, comprehensive program to attract and retain top-tier candidates and minimize vacancies which negatively impact department operations
No
Strengthen Emergency
Preparedness and Disaster
Response
Implement targeted outreach campaigns to enhance disaster response and preparedness for vulnerable populations and highrisk areas.
No
PUBLIC SAFETY
Police & Fire Facilities
Assessments and Plans
Conduct comprehensive assessments of police and fire facilities and develop a plan to meet current and future operational needs.
No
COMMUNITY SERVICES
POLICIES / PROGRAMS
Implement Arts & Culture
Master Plan – Research
Branding/Identity, Future
Funding, % for the Arts
Continue implementation of the Arts & Culture Master Plan with a focus on incorporating artistic components into the Foley Family Community Pavilion project; developing branding and identity for the arts in Healdsburg, and research and develop a recommendation for a proposed Percent for Arts ordinance.
No
Revise City-HUSD Joint Use
Agreement
Update the agreement between the City and Healdsburg Unified School District for sharing of facilities to address recent improvements, renovations, and additions to facilities owned and operated by each organization.
No
Launch the Foley Family
Community Pavilion
Operational Plan
Develop an operational plan that would include operating and use policies, rental opportunities and fees, staffing, and maintenance of the facility.
Not at this
stage
Compassionate Communities
End-of-Life Program
Support a Compassionate Communities end-of-life program at the Senior Center.
No
Support Latino Community
and Immigration Issues
Support Latino community and immigration issues. No
COMMUNITY FACILITIES
Develop an Implementation
Plan and Funding Strategy for
Abel De Luna Community
Center Multicultural Center
Vision
Develop a strategy and funding plan for implementing the vision set forth in the Healthcare Foundation’s Multicultural Center Plan which is focused on the Community Center facility. Work would be implemented in collaboration with the Healthcare Foundation of Northern Sonoma County and Corazon
Healdsburg.
Not at this
stage. $500k
County grant
anticipated.
PARK / OPEN SPACE
Laura Fish Somersal Park
Development – Complete
Design & Begin Phase 1
Construction
Complete the design and begin construction of Phase 1 of the park to include a multipurpose trail, creek restoration, and support facilities such as parking and restrooms.
TBD. Staff
working to
align scope
with available
funding.
Badger Park Redevelopment –
Complete Design & Begin
Phase 1 Construction
Complete the design and begin construction of Phase 1 of the park to include enhanced river access and installation of permanent restrooms.
TBD
Prioritize Creation of an
Inclusive “Magical Bridge”
Playground
Prioritize the creation of an inclusive "Magical Bridge" playground for either Laura Fish Somersal Park or Badger Park.
TBD
8.A.a
Packet Pg. 198 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals) 6 | Page
DRAFT FY 25-26 GOAL DASHBOARD
(see next page)
Prepared by MRG, a local government consulting firm
Cathy Capriola & Jessica Deakyne, Consultants
www.solutions-mrg.com
4/22/2025
8.A.a
Packet Pg. 199 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals)
ECONOMIC
DIVERSITY &
SUSTAINABLE
GROWTH
ENVIRONMENTAL
STEWARDSHIP
AFFORDABLE
HOUSING
INFRASTRUCTURE &
FACILITIES
EFFECTIVE
GOVERNANCE
PUBLIC HEALTH &
SAFETY
COMMUNITY
SERVICES
Housing Element Land
Use Code Updates
(Density Bonus
Ordinance, SB 9
Ordinance, SB 684 & SB
1123 Ordinance)
Station Area Specific Plan
– Planning Grant
Objective Design
Standards
2025 CA Building Code
Update/Adoption
Update Parklet Program
for 2026 and Beyond
Host Meeting on
Economic Trends
Update of Tree
Ordinances –
Protection & List*
Renewable Energy
Procurement Plan*
Water Bottle Filling
Station
*From Climate
Mobilization Study
Inclusionary Housing
Ordinance Update –
Update In-lieu Fee for
Smaller Projects
Support Permitting
Process for Saggio Hills
Affordable Housing &
155 Dry Creek
Affordable Housing
Facilitate the
Exploration of a
Community Housing
Land Trust
Complete Renovations
of Victory Studios &
Apartments
Prioritize Options to
Eliminate/Reduce
Barriers to Encourage
Housing Development
PARKS / LANDSCAPING
STREETS / BIKES / PEDESTRIAN
Healdsburg Avenue
Complete Street Project –
Design*
Grove Street Neighborhood
Plan – Begin Construction*
Ward Street Neighborhood
Plan – Infrastructure
Planning
Active Transportation Plan
Implementation*
Complete March Avenue
Pavement Rehabilitation &
Enhanced Crossing @
Lupine*
Explore Revenue for
Infrastructure & Road
Repair
*From Climate Mobilization
Study
WATER
Dry Creek Well Field -
Construction Drawings
Sonoma Water Purchase
Agreement for Additional
Water
INFRASTRUCTURE
Evaluate and Implement
Flood Monitoring
Technology
Enhance City
Communication &
Outreach to Build Public
Trust
Update the Council’s
Governance Protocols
Constituent Request
System
Council Chamber A/V
Infrastructure
Improvements/Upgrades
– Phase I
FIRE
Fire Department
Standards of Cover Study
Fit and Finish Fire
Substation
Roll-out of Wildfire
Mitigation Program –
Parcel-to-Parcel
Inspections
Development of a
Community Chipper
Program & Funding
Exploration
City Open Space Wildfire
Management Plan
POLICE
Police Recruitment &
Retention Initiative
Strengthen Emergency
Preparedness and
Disaster Response
BOTH
Police & Fire Facilities
Assessments and Plans
POLICIES / PROGRAMS
Implement Arts & Culture
Master Plan – Research
Branding/Identity, Future
Funding, % for the Arts
Revise City-HUSD Joint Use
Agreement
Launch the Foley Family
Community Pavilion
Operational Plan
Compassionate Communities
End-of-Life Program
Support Latino Community
and Immigration Issues
COMMUNITY FACILITIES
Develop an Implementation
Plan and Funding Strategy for
Abel De Luna Community
Center Multicultural Center
Vision
PARK / OPEN SPACE
Laura Fish Somersal Park
Development – Complete
Design & Begin Phase 1
Construction
Badger Park Redevelopment –
Complete Design & Begin
Phase 1 Construction
Prioritize Creation of an
Inclusive “Magical Bridge”
Playground
DASHBOARD -- FY 25-26 City Council Goals & Active Projects | City of Healdsburg 8.A.a Packet Pg. 200 Attachment: FY 25-26 Goal Setting - Retreat Report (4860 : City Council FY 25-26 Goals)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Speed Limit Reduction Evaluation
PREPARED BY: Curt Bates, Principal Engineer
STRATEGIC INITIATIVE(S):
Maintain and Enhance Public Health and Safety
RECOMMENDED ACTION(S):
Introduce for first reading, by title only, waiving further reading of the text, an Ordinance Amending Section 10.50.050 of the Healdsburg Municipal Code, Prima Facie Streets Established by Engineering and Traffic Survey (Regarding Speed Limits in the City of Healdsburg).
COMMUNITY ENGAGEMENT/OUTREACH:
Within fifteen (15) days of its passage, this Ordinance shall be published at least once in a newspaper of general circulation published and circulated in the City of Healdsburg, along with the names of the members of the City Council voting for and against its passage. Also, Section 22358 of the California Vehicle Code requires that appropriate signs be installed on the date the City Council action goes into effect, thereby giving notice of changes to posted speed limits.
New speed limit signs and changed condition flags will be placed at speed limit signs that have been reduced, for a period of at least two weeks, to notify drivers of modified speed limits. Also, in accordance with the recently updated California Vehicle Code sections, the Healdsburg Police Department shall issue only warning citations for violations of exceeding the speed limit by 10 miles per hour (mph) or less for the first 30 days that a lower speed limit is in effect as authorized by this section.
BACKGROUND:
On March 15, 2021, the Healdsburg City Council adopted Ordinance No. 1208 amending speed limits set in section 10.50.050 of the Healdsburg Municipal Code. By adopting the updated ordinance, the City Council found that the engineering and traffic surveys dated January 27, 2020, prepared by the City’s traffic engineering consultant, were acceptable to justify speed limits set for 32 street segments within Healdsburg.
On January 3, 2022, the Healdsburg City Council Adopted Ordinance No. 1212, reducing speed limits on Front Street between Healdsburg Avenue and Mason Street, and Healdsburg Avenue
9.A
Packet Pg. 201
between Exchange Avenue and Front Street by 5 mph based on a review of the existing engineering and traffic surveys and new rules in Assembly Bill 43. At that time, the City Council was informed that vehicle code amendments from Assembly Bill 43 were still under review and that City staff intended to perform a detailed technical and legal review of the amendments, monitor the progress of the updates to the Manual on Uniform Traffic Control Devices by the Department of Transportation, and bring back a comprehensive update to the City Council at a future meeting date. Subsequently, additional speed limit related bills including Assembly Bill 382, Assembly Bill 1014, and Assembly Bill 1938 have been signed into state law, giving local agencies increased flexibility and authority to reduce speed limits on locally controlled, public roadways.
In May of 2023, the City of Healdsburg, along with other local agencies in Sonoma County, collaborated with staff from the Sonoma County Transportation and Climate Authority (SCTCA) to apply for a planning grant through the U.S. Department of Transportation (USDOT) Safe Streets for All Program. The program is aimed at preventing roadway deaths and serious injuries by creating safer roadways for all users. On December 13, 2023, SCTCA issued a press release that it was awarded a planning grant in the amount of $1,060,000 through the Safe Streets for All program to conduct planning and carry out activities related to transportation safety within Sonoma County. The City of Healdsburg was allocated $124,000 of the grant to create Safe Routes to School plan documents for four public and two private schools as well as perform a speed limit reduction study including the preparation of updated engineering and traffic surveys for various street segments in Healdsburg.
On August 19, 2024, the Healdsburg City Council adopted Resolution No. 97-2024, authorizing the City Manager to execute a cooperative funding agreement with SCTCA to contribute the required local agency match funding for the study. The City of Healdsburg entered into the cooperative agreement with the SCTCA on September 16, 2024.
SCTCA initiated a request for proposals in July 2024 to solicit interest from qualified consulting firms to assist SCTCA and City of Healdsburg in performing the speed limit reduction evaluation. City of Healdsburg Public Works staff participated in the consultant selection process. The consulting firms of Mark Thomas and Fehr and Peers were selected in October of 2024, and a project kick-off meeting occurred in December 2024.
DISCUSSION/ANALYSIS:
The City of Healdsburg is among the first public agencies in Sonoma County to apply California’s new speed limit setting guidance to conduct a speed limit reduction evaluation. The evaluation, which was funded as part of a USDOT Safe Streets for All grant awarded to SCTCA and the City, is consistent with Assembly Bill 43, other related speed limit reduction assembly bill updates, as well as the 2014 California Manual on Uniform Traffic Control Devices (CA MUTCD), revision nine. To determine which City-maintained roadways could be prioritized for speed limit reductions, staff considered the following CA MUTCD criteria :
1. 85th Percentile Speed: Eligible for 5 mph reduction if nearest 5 mph increment requires rounding down.
2. Safety Corridor Designation: Eligible for 5 mph reduction.
9.A
Packet Pg. 202
3. Proximity to Bicyclist/Pedestrian Generators: Eligible for 5 mph reduction.
4. Business Activity District Designation: Eligible for 25 or 20 mph prima facie speed limit.
5. School Zone Designation: Eligible for 15 and 25 mph prima facie speed limits.
6. Senior Zone Designation: Eligible for 25 mph prima facie speed limit.
Thirty-five roadway segments were evaluated for potential speed limit reductions through the engineering and traffic survey process. The segments selected to be analyzed were primarily arterial and collector streets with higher traffic volumes and speeds, as well as areas with higher concentration of vulnerable users including school zones, the downtown core area, and locations with seniors. The engineering and traffic survey process takes the following speed limit setting criteria into account: 85th percentile speed, Safety Corridor designation, and proximity to bicyclist/pedestrian generators. Street segments that were not selected to be analyzed with this evaluation can be analyzed in the future and brought to the City Council for consideration. 85th Percentile Speed:
The engineering and traffic survey process requires local agencies to first conduct a study to collect vehicular speeds using a calibrated radar or other electronic speed measuring device. Per Section 2B.13, paragraph 27 of the CA MUTCD, speed surveys are to be conducted during offpeak traffic hours on a fair-weather weekday to capture “typical” conditions. Based on the cumulative measured speed data, the 85th percentile speed (i.e., the speed at which 85% of drivers are traveling at or below) is determined. Previously the speed was rounded to the nearest 5 mph increment. Under AB 43, the City is now explicitly authorized to round down to the nearest 5 mph increment.
Sample 85th percentile speeds and the application of the speed limit setting guidelines described above for local agency roadways and private roadways subject to the California Vehicle Code are shown in Table 1 of the technical memorandum on speed limit reduction methodology attached to this staff report.
Proximity to Bicyclist/Pedestrian Generators:
Proximity to bicyclist/pedestrian generators is one of two new options to reduce the speed limit by 5 mph. The other option is Safety Corridor designation, which will be discussed in the following section. Per the CA MUTCD, local authorities can apply a 5 mph speed limit reduction if the roadway is adjacent to any land or facility that generates high concentrations of bicyclists or pedestrians, especially those from vulnerable groups such as children, seniors, persons with disabilities, and the unhoused.
To meet this criterion, the roadway segment must have one or more bicyclist/pedestrian generators present within a distance of 1,320 feet. A list of qualifying bicyclist/pedestrian generators, which includes the presence of bicycle and pedestrian infrastructure, is provided in Table 2 in the technical memorandum on speed limit reduction methodology attached to this staff report. If the roadway segment is longer than 1,320 feet, a minimum of one generator must be present for every 1,320 feet.
9.A
Packet Pg. 203
For the City of Healdsburg, this criterion was satisfied through existing sidewalk infrastructure alone (i.e., every quarter mile sub-segment evaluated had sidewalk present within a quarter mile).
Safety Corridor Designation:
Safety Corridor designation is the second of two new options (the first one being proximity to bicyclist/pedestrian generators as described above) to reduce the speed limit by 5 mph. The CA MUTCD defines a Safety Corridor as “a roadway segment within an overall roadway network where the highest number of serious injury and fatality crashes occur.” Per the CA MUTCD, Safety Corridors should not constitute more than 20% of a local jurisdiction’s overall roadway network. As part of this evaluation, the consultant provided the City of Healdsburg with a datadriven network of Safety Corridors eligible for this 5 mph reduction. A map of the City’s Safety Corridor Network can be found in Attachment A and the methodology and data sources used to develop this network can be found in Attachment B of the technical memorandum on speed limit reduction methodology attached to this staff report.
Prima Facie Zone:
In addition to the potential reductions explored through the engineering and traffic survey process, candidate roadways were also identified based on prima facie zone eligibility. A prima facie speed limit is generally defined as the speed limit on street segments where there are no speed limit signs posted, such as in residential neighborhoods. Each prima facie zone has a corresponding speed limit and a unique set of conditions that must be met for a local agency to declare a prima facie speed limit. Many prima facie zones are exempt from certain speed trap provisions and therefore do not require an engineering and traffic survey for radar enforcement.
The following prima facie zone types were considered as part of this evaluation: Business Activity District, School Zone, and Senior Zone.
Business Activity District Designation:
Per the CA MUTCD, local authorities can declare, by ordinance or resolution, a 25 or 20 mph prima facie speed limit on a roadway contiguous to a Business Activity District if the roadway has four or fewer travel lanes and meets one of the following conditions: 1. Maximum posted speed limit of 30 mph immediately prior to and after the Business Activity District, if establishing a 25 mph prima facie speed limit or 2. Maximum posted speed limit of 25 mph immediately prior to and after the Business Activity District, if establishing a 20 mph prima facie speed limit. The CA MUTCD defines a Business Activity District as “the portion of a highway and the property contiguous thereto that includes central or neighborhood downtowns, urban villages, or zoning designations that prioritize commercial land uses at the downtown or neighborhood scale.” To qualify as a Business Activity District, an area must meet at least three of the following four requirements:
1. No less than 50% of the contiguous property fronting the highway consists of retail or dining commercial uses, including outdoor dining, that open directly onto sidewalks
9.A
Packet Pg. 204
adjacent to the highway.
2. Parking, including parallel, diagonal, or perpendicular spaces, located alongside the highway.
3. Traffic control signals or stop signs regulating traffic flow on the highway, located at intervals of no more than 600 feet.
4. Marked crosswalks not controlled by a traffic control device. Any roadway located within Downtown Healdsburg was evaluated for Business Activity District eligibility.
City staff defines downtown Healdsburg as the area bordered by Grove/Vine Street to the west, Piper Street to the north, Center Street and East Street to the east, and Mill Street to the south.
The recommendation is to reduce speed limits to 20 mph in the downtown core area where greater intensities of pedestrian and bicycle use are typically observed and to retain existing speed limits of 25 mph on the outskirts of the downtown core. A map of all roadway segments eligible for Business Activity District designation can be found in Attachment C in the technical memorandum on speed limit reduction methodology attached to this staff report.
School Zone Designation:
Per the updated CA MUTCD, local authorities can declare, by ordinance or resolution, a 20 or 15 mph prima facie speed limit within 500 feet of school grounds and an extended 25 mph prima facie speed limit within 500 to 1,000 feet from school grounds if the following criteria are met:
1. Roadway is in a residential district.
2. Roadway has a maximum posted speed limit of 30 mph before and after the school zone.
3. Roadway has a maximum of two through traffic lanes (one in each direction or two in one direction).
In California, school speed limits apply when children are present. If the school grounds are separated from the roadway by a fence, gate, or other physical barrier, the school speed limits should be enforced when children are going to or leaving the school, either during school hours or during the noon recess hour. If the school grounds are not separated from the roadway by a fence, gate, or other physical barrier, the school speed limits should be enforced whenever the school grounds are in use by children. Enforcement of school speed limits is ultimately at the discretion of the police officer. Any roadway contiguous to a school building or school grounds in the City was evaluated for school zone eligibility. A map of all eligible school zones can be found in Attachment D in the technical memorandum on speed limit reduction methodology attached to this staff report.
Senior Zone Designation:
Per the CA MUTCD, local authorities can establish a 25 mph prima facie speed limit in a senior zone. The CA MUTCD defines a senior zone as “an area approaching or passing a senior center building or other facility primarily used by senior citizens, or the grounds thereof that is contiguous to a highway.” Matheson Street, which is contiguous to the Healdsburg Senior Center, and Grove Street, which is contiguous to Healdsburg Senior Living, were evaluated for senior zone eligibility. A map of all eligible senior zones can be found in Attachment E in the
9.A
Packet Pg. 205
technical memorandum on speed limit reduction methodology attached to this staff report.
Enforcement:
The proposed recommendations were reviewed and are supported by the Healdsburg Police Department. Speed enforcement is provided throughout the City. Targeted speed enforcement is typically complaint driven based at locations throughout the City. As time allows, officers will proactively conduct speed enforcement in areas of the City with higher traffic volumes or known speeding issues. The proposed recommendations would provide for reduced speeds while balancing speed enforcement expectations and enforcement tolerances (i.e. radar gun limitations). The updated engineering and traffic surveys provide the Police Department staff with supporting documentation in the event a speeding citation is challenged in court.
Recommendation:
City staff recommends speed limits be reduced on the street segments shown in the following table. Street segments evaluated as part of this study that are not listed in the table below are proposed to remain the same and are listed in the attached Evaluation Summary Table and Exhibit A to the ordinance. No increases to speed limits are proposed as part of this study.
Street Segment Boundaries Existing
Speed
Limit in
mph
Proposed
Speed
Limit in
mph
Center Street North Street to Mill Street 25 20
Dry Creek Road US 101 to Healdsburg Avenue 30 25
Grove Street Healdsburg Avenue to Dry Creek Road 30 25
Grove Street Dry Creek Road to West Grant Street 30 25
Grove/Vine Street West Grant Street to Mill Street 30 25 Healdsburg Ave Northern City Limits to Parkland Farms Boulevard 40 35 Healdsburg Ave Parkland Farms Blvd. to Dry Creek Rd./March Ave. 35 30 Healdsburg Ave Dry Creek Rd./March Ave. to Powell Avenue 35 30 Healdsburg Ave Powell Avenue to Grant Street 30 25
Healdsburg Ave Piper Street to Mill Street 25 20
Healdsburg Ave Mill Street to Exchange Avenue 30 25
Healdsburg Ave Bailhache Avenue to Southern City Limits 45 35 March Avenue Healdsburg Avenue to Woodside Court 30 25
Matheson Street Western City Boundary to Williamson Wines 25 20 Matheson Street Williamson Wines to Healdsburg Avenue 25 20 Matheson Street Healdsburg Avenue to East Street 25 20
Mill Street East Street to US 101 30 25
North Street Grove/Vine Street to East Street 25 20
Plaza Street Healdsburg Avenue to Center Street 25 20
Powell Avenue University Street to Eastern City Limits 30 25 South Fitch
Mountain Road
Heron Drive to Eastern City Limits 35 30
9.A
Packet Pg. 206
ENVIRONMENTAL STEWARDSHIP:
Not applicable.
ALTERNATIVES:
The City Council may:
1. Choose to reduce speed limits as allowed per the speed limit reduction evaluation shown in the evaluation summary table.
2. Choose not to reduce any speed limits as permitted in the speed limit reduction evaluation.
3. Maintain existing speed limits.
FISCAL IMPACT:
This speed limit reduction evaluation was funded through the Safe Streets for All planning grant awarded to SCTCA on December 13, 2023. The City of Healdsburg partnered with SCTCA for this evaluation. The dollar amount of SCTCA grant for this evaluation was $60,000 and the City’s required funding match for this study was $12,000.
There will be expenses to the streets fund to purchase and install new speed limit signs and update speed limit pavement markings for the street segments in which the speed limit is decreased, as well installation of changed conditions ahead signage. The cost for new sign installation and updated pavement markings will be further refined but is estimated to be approximately $10,000. Costs are not anticipated until Fiscal Year 2025-26 and sufficient appropriations exist in the adopted budget.
ENVIRONMENTAL ANALYSIS:
This action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060 (c)(2) the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment, and 15060 (c)(3) the activity is not a project as defined in section 15378 of the CEQA guidelines (Title 14, Chapter 3 of the California Code of Regulations) because it has no potential for resulting in physical change to the environment, either directly or indirectly. Finally, if adoption of this Ordinance is deemed to be a project, it is also exempt from CEQA under the exemption set forth in Section 15301(c), which provides that CEQA does not apply to actions hat
ATTACHMENT(S):
Ordinance
Evaluation Summary Table
Map Exhibit of Recommended Speed Limit Reductions
Technical Memorandum Speed Limit Reduction Evaluation Summary
9.A
Packet Pg. 207
CITY OF HEALDSBURG
ORDINANCE NO. _____
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG AMENDING SECTION 10.50.050 OF THE
HEALDSBURG MUNICIPAL CODE, PRIMA FACIE STREETS
ESTABLISHED BY ENGINEERING AND TRAFFIC SURVEY
(REGARDING SPEED LIMITS IN THE CITY OF
HEALDSBURG)
The City Council of the City of Healdsburg does herby ordain as follows:
SECTION 1. Findings.
The City Council finds as follows:
A. On October 8, 2021, Assembly Bill 43 was signed into law, giving local agencies increased flexibility and authority to reduce speed limits on locally controlled, public roadways. Assembly Bill 43 allows local agencies to consider a wider range of factors when setting speed limits, including roadway classification, land use, crash rates, and bicyclist or pedestrian activity. The law emphasizes the need to consider the roadway context when setting speed limits, especially in urban areas and/or areas where vulnerable road users are present. Shortly after Assembly Bill 43 was signed into law, Assembly Bill 382, Assembly Bill 1014, and Assembly Bill 1938 were signed into law, and the California Manual on Uniform Traffic Control Devices (CA MUTCD) was updated to incorporate the provisions of Assembly Bill 43.
B. California Vehicle Code section 40802 requires the use of radar (or any other electronic device that measures the speed of moving objects) for enforcement of declared prima facie speed limits be justified by an engineering and traffic survey conducted no more than seven years, or fourteen years old if an engineering and traffic survey was conducted more than seven years prior to the date of the alleged violation, and a registered engineer evaluates the section of the highway and determines that no significant changes in roadway or traffic conditions have occurred, including but not limited to, changes in adjoining property or land use, roadway width, or traffic volume.
C. Cal. Vehicle Code sections 22357 and 22358 further allow the City to determine and declare prima facie speed limits, by ordinance, that increase or decrease existing prima facie speed limits, provided that the revised prima facie speed limits are determined on the basis of an engineering and traffic survey.
D. In May of 2023, the City of Healdsburg, amongst other local agencies in Sonoma County, collaborated with staff from the Sonoma County Transportation and Climate Action Authority (SCTCA) to apply for a planning grant through the U.S. Department of Transportation Safe Streets for All program. The program is aimed at preventing roadway deaths and serious injuries by creating safer roadways for all users. On December 13, 2023, the SCTCA issued a press release that it was awarded a planning grant in the amount of $1,060,000 through the Safe Streets for All program to conduct planning and carry out activities related to transportation safety within Sonoma County. The City of Healdsburg was allocated $124,000 of the grant to create Safe Routes to School plan documents for four public and two private schools as well as perform a speed limit
9.A.a
Packet Pg. 208 Attachment: Ordinance (4890 : Speed Limit Reduction Evaluation) Ordinance No.
reduction study including the preparation of updated engineering and traffic surveys for various street segments in Healdsburg.
E. On August 19, 2024, the Healdsburg City Council adopted Resolution No. 97-2024 authorizing the City Manager to execute a cooperative funding agreement with the SCTCA to contribute the required local agency match funding for the study. The City of Healdsburg entered into the cooperative agreement with the SCTCA on September 16, 2024.
F. The Public Works Department working with the consulting engineer contracted through the Sonoma County Transportation and Climate Action Authority, and with support from the Healdsburg Police Department, performed a speed limit reduction evaluation which included an update of its engineering and traffic surveys and an evaluation of existing speed limits on thirty-five street segments within the City of Healdsburg and updated engineering and traffic surveys in accordance with the newly added Vehicle Code sections, and have recommended updates listed in Exhibit A to this ordinance.
G. The City Council finds that the adjustments to the speed limits as outlined in this Ordinance will facilitate the orderly movement of traffic and be reasonable and safe for the community.
SECTION 2. Amendment of Section 10.50.050 of the Healdsburg Municipal Code.
Section 10.50.050 of the Healdsburg Municipal Code, including its title, is hereby amended to read in its entirety as shown on Exhibit A to this ordinance, attached hereto and incorporated herein by reference.
SECTION 3. Compliance with the California Environmental Quality Act.
For purposes of the California Environmental Quality Act (Public Resources Code Section 21000, et seq.), a “project” is defined in State CEQA Guidelines Section 15378 (a) as “the whole of an action, which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment”. The City Council hereby finds that the action to adopt this ordinance will not result in any change in the environment and thus is not a project subject to the requirements of CEQA. Further, even if the action to adopt this ordinance was deemed to be a project subject to CEQA, the City Council finds the proposed ordinance is exempt from CEQA under the common sense exemption set forth in Section 15061(b)(3), which provides that CEQA only applies to projects which have the potential for causing a significant effect on the environment, and thus where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Finally, if adoption of this Ordinance is deemed to be a project, it is also exempt from CEQA under the exemption set forth in Section 15301(c), which provides that CEQA does not apply to actions that make changes to existing facilities (in this case, streets), but do not expand the facility.
SECTION 4. Severability.
9.A.a
Packet Pg. 209 Attachment: Ordinance (4890 : Speed Limit Reduction Evaluation) Ordinance No.
The City Council hereby declares every section, paragraph, sentence, clause and phrase of this ordinance to be severable. If any section, paragraph, sentence, clause or phrase of this ordinance is for any reason found to be invalid or unconstitutional, such invalidity, or unconstitutionality shall not affect the validity or constitutionality of the remaining sections, paragraphs, sentences, clauses or phrases.
SECTION 5. Inclusion in the Healdsburg Municipal Code.
It is the intention of the Healdsburg City Council that the text in Exhibit A of this ordinance be made a part of the Healdsburg Municipal Code and that the text may be renumbered or re-lettered and the word “Ordinance” be changed to “Section,” “Chapter,” or any other appropriate word or phrase consistent with this intention.
SECTION 6. Effective Date and Duration.
This Ordinance of the City of Healdsburg shall take effect and be in force 30 days after the date of its passage, but in no event earlier than July 16, 2025.
SECTION 7. Publication.
Within fifteen (15) days of its passage, this Ordinance shall be published at least once in a newspaper of general circulation published and circulated in the City of Healdsburg, along with the names of the members of the City Council voting for and against its passage.
This Ordinance was introduced at a regular meeting of the Healdsburg City Council on the 2 nd day
of June 2025, and was adopted at a regular meeting of the Healdsburg City Council on the ___ day of ____, 2025, by the following vote:
AYES: Councilmembers: ( )
NOES: Councilmembers: ( )
ABSENT: Councilmembers: ( )
ABSTAINING: Councilmembers: ( )
SO ORDERED: ATTEST:
____________________________________ ____________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
Dated: ______________________________
9.A.a
Packet Pg. 210 Attachment: Ordinance (4890 : Speed Limit Reduction Evaluation) Ordinance No.
Exhibit A
10.50.050 Prima facie speed limits established by engineering and traffic survey.
In accordance with the California Vehicle Code, the prima facie speed limits for the streets, or portions thereof, designated in this section are hereby designated to be as follows:
Street Segment Boundaries Speed
Limit
Center Street Powell Avenue to North Street 25
Center Street North Street to Mill Street 20
Chiquita Road City limits North to US 101 30
Chiquita Road US 101 to Grove Street 30
Dry Creek Road US 101 to Healdsburg Avenue 25
Fitch Street Powell Avenue to Matheson Street 25
Fitch/Harmon/Hud
son Street
Front Street to Matheson Street 25
Front Street Mason Street to Healdsburg Avenue 25
Grant Avenue Grove Street to University Street 25
Grove Street Healdsburg Avenue to Dry Creek Road 25
Grove Street Dry Creek Road to West Grant Street 25
Grove/Vine Street West Grant Street to Mill Street 25
Healdsburg Ave Northern City Limits to Parkland Farms Boulevard 35 Healdsburg Ave Parkland Farms Blvd. to Dry Creek Rd./March Ave. 30 Healdsburg Ave Dry Creek Rd./March Ave. to Powell Avenue 30 Healdsburg Ave Powell Avenue to Grant Street 25
Healdsburg Ave Grant Street to Piper Street 25
Healdsburg Ave Piper Street to Mill Street 20
Healdsburg Ave Mill Street to Exchange Avenue 25
Healdsburg Ave Exchange Avenue to Front Street/Kennedy Lane 25 Healdsburg Ave Memorial Bridge East Approach to Bailhache Ave. 30 Healdsburg Ave Bailhache Avenue to Southern City Limits 35 Kinley Drive Westside Road to Magnolia Drive South 35
March Avenue Healdsburg Avenue to Woodside Court 25
Matheson Street Western City Boundary to 14 Healdsburg Avenue 20 Matheson Street 14 Healdsburg Avenue to Healdsburg Avenue 20 Matheson Street Healdsburg Avenue to East Street 20
Matheson Street East Street to Fitch Street 25
Matheson Street Fitch Street to Heron Street 25
Mill Street East Street to US 101 25
North Street Grove/Vine Street to East Street 20
Parkland Farms Healdsburg Avenue to Saddle Draw 35
9.A.a
Packet Pg. 211 Attachment: Ordinance (4890 : Speed Limit Reduction Evaluation) Ordinance No.
Boulevard
Plaza Street Healdsburg Avenue to Center Street 20
Powell Avenue Healdsburg Avenue to University Street 25 Powell Avenue University Street to Eastern City Limits 25 South Fitch
Mountain Road
Heron Drive to Eastern City Limits 30
Terrace Boulevard Healdsburg Avenue to University Street 25 University Avenue Terrace Boulevard to Powell Avenue 30 University Street Powell Avenue to Mason Street 25
9.A.a
Packet Pg. 212 Attachment: Ordinance (4890 : Speed Limit Reduction Evaluation) Street From To Existing Speed
Limit
Maximum
Allowable Posted
Speed Reduction
Maiximum
Allowable Reduced
Speed Limit
Recommended
Speed Limit
Speed Limit Reduction Scoring
Criteria
Recommendation Justification
Healdsburg Avenue Northern City Boundary Parkland Farms Boulevard 40 5 35 35 Safety Corridor, Bike/Ped Generator Recommend full reductionHealdsburg Avenue Parkland Farms Boulevard Dry Creek Road 35 5 30 30 Rounding Down, Bike/Ped Generator Recommend full reduction Healdsburg Avenue Dry Creek Road Powell Avenue 35 5 30 30 Rounding Down, Safety Corridor, Bike/Ped Generator Recommend full reduction Healdsburg Avenue Powell Avenue Grant Street 30 5 25 25 Rounding Down, Safety Corridor, Bike/Ped Generator Recommend full reduction
Healdsburg Avenue Grant Street Piper Street 25 5 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHHealdsburg Avenue Piper Street Mill Street 25 5 20 20 Safety Corridor, Bike/Ped Generator Recommend full reductionHealdsburg Avenue Mill Street Exchange Avenue 30 5 25 25 Safety Corridor, Bike/Ped Generator Recommend full reductionHealdsburg Avenue Exchange Avenue Front Street 25 0 25 25 Safety Corridor, Bike/Ped Generator No reduction allowed per evaluationHealdsburg Avenue Healdsburg Ave Bridge (East) Bailhache Avenue 30 5 30 30 Safety Corridor, Bike/Ped Generator Retain 30 mph to create a smoother transition between speed zone to the southHealdsburg Avenue Bailhache Avenue Southern City Boundary 45 10 35 35 Safety Corridor, Bike/Ped Generator Recommend full reduction Piper Street Tee Drive Healdsburg Avenue 25* 10 15 25 Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Mill Street East Street US Highway 101 30 5 25 25 Safety Corridor, Bike/Ped Generator Recommend full reduction East Street Dryer Street Piper Street 25* 10 15 25 Rounding Down, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Dry Creek Road US Highway 101 Healdsburg Avenue 30 5 25 25 Safety Corridor, Bike/Ped Generator Recommend full reduction March Avenue Healdsburg Avenue Woodside Court 30 5 25 25 Bike/Ped Generator Recommend full reduction Matheson Street Western City Boundary Williamson Wines 25* 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsMatheson Street Williamson Wines Healdsburg Avenue 25 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsMatheson Street Healdsburg Avenue East Street 25 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsMatheson Street East Street Fitch Street 25 10 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHMatheson Street Fitch Street Heron Drive 25 5 25 25 Rounding Down, Bike/Ped Generator
No reduction allowed per evaluation
South Fitch Mountain Road Heron Drive Eastern City Boundary 35 5 30 30 Bike/Ped Generator Recommend full reduction Powell Avenue Healdsburg Avenue University Street 25 5 20 25 Rounding Down, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHPowell Avenue University Street Eastern City Boundary 30 5 25 25 Rounding Down, Bike/Ped Generator Recommend full reduction Front Street Healdsburg Avenue Mason Street 25 0 25 25 Safety Corridor, Bike/Ped Generator No reduction allowed per evaluation First Street Mason Street Piper Street 25* 5 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Fitch Street Powell Avenue Matheson Street 25 5 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Fitch Street / Harmon
Street / Hudson Street
Matheson Street Front Street 25 5 20 25 Rounding Down, Bike/Ped Generator
Outside of downtown core - recommend keep at 25 MPH
9.A.b
Packet Pg. 213
Attachment: Evaluation Summary Table (4890 : Speed Limit Reduction Evaluation) Street From To Existing Speed
Limit
Maximum
Allowable Posted
Speed Reduction
Maiximum
Allowable Reduced
Speed Limit
Recommended
Speed Limit
Speed Limit Reduction Scoring
Criteria
Recommendation Justification
Grove Street Healdsburg Avenue Dry Creek Road 30 5 25 25 Bike/Ped Generator Recommend full reductionGrove Street Dry Creek Road West Grant Street 30 10 20 25 Rounding Down, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH. Will re- review after Grove Street project has been constructed.
Grove Street / Vine Street West Grant Street Mill Street 30 5 25 25 Bike/Ped Generator Recommend full reduction Center Street Powell Avenue North Street 25 5 20 25 Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHCenter Street North Street Mill Street 25 5 20 20 Bike/Ped Generator Recommend full reduction Grant Street Grove Street University Street 25 5 20 25 Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Plaza Street Healdsburg Avenue Center Street 25 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsPlaza Street Center Street Eastern Terminus 25* 10 15 20 Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segments North Street Grove Street / Vine Street East Street 25* 10 15 20 Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segments * This speed limit is not currently posted.
9.A.b
Packet Pg. 214
Attachment: Evaluation Summary Table (4890 : Speed Limit Reduction Evaluation) Tayman
Park
Sanns Ln
Plaza St
Fit
c
h
S
t
Healdsburg Memorial Bridge
Monte Vista Ave
First St
University Ave
Heald
s
b
urg
Av
e
Heal dsburgAve
Piper St
Tucker St
Healdsburg Ave
Harold Ln
East St
Matheson St
North St
Center St
North St
Dry Creek Rd
Grant St
Mill St
Fr
o
nt St
College St
G
r
o
v
e
S treet/Vine St Gr
o
v
e
St
Powell Ave
March Ave
S Fitch Mountain Rd
Recommended Posted Speed Limits
City of Healdsburg
Recommended Speed Limits (Including School Zones)
15 mph (when children are present as defined by CA MUTCD) 20 mph
25 mph
30 mph
35 mph
Corridors Evaluated – No Changes Recommended (Including School Zones) Schools
9.A.c
Packet Pg. 215 Attachment: Map Exhibit of Recommended Speed Limit Reductions (4890 : Speed Limit Reduction Evaluation) 345 California Street | Suite 450 | San Francisco, CA 94104 | (415) 348-0300 | Fax (415) 773-1790 www.fehrandpeers.com
Memorandum
Date: May 15th, 2025
To: City of Healdsburg; Curt Bates
CC: Sonoma County Transportation and Climate Authority; Margot Ocañas, From: Fehr & Peers; Erin Ferguson, Angelica Rocha, Emily Turner, and Drake Hayes Subject: City of Healdsburg Speed Limit Reduction Evaluation Methodology SF24-1385
Introduction
Speed is one of the main contributing factors to the severity of collisions. Higher travel speeds on public streets not only increase the likelihood of being involved in a collision, but they also increase the severity of injuries sustained by all road users involved in a collision, as shown in Figure 1.
Figure 1: Relationship between Vehicle Speed, Collisions, and Fatalities1 For this reason, many agencies across the country are adopting the Safe System Approach, 2 which
includes Safe Speeds as one of its five core elements. Notably, the U.S. Department of Transportation (USDOT), California Department of Transportation (Caltrans), and Sonoma County Transportation and Climate Authority (SCTCA) have adopted the Safe System Approach. The Safe 1 https://scag.ca.gov/sites/main/files/file-attachments/cal-guidance-hin-090221.pdf?1633549750 2 https://www.transportation.gov/NRSS/SafeSystem
9.A.d
Packet Pg. 216 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) 2 City of Healdsburg
May 15th, 2025
System Approach emphasizes that lower speeds reduce the force of impact in the event a collision occurs, thereby reducing the severity of injuries.
In October 2021, Assembly Bill (AB) 43 was signed into law, giving local agencies increased flexibility and authority to reduce speed limits on locally controlled, public roadways. AB 43 allows local agencies to consider a wider range of factors when setting speed limits, including roadway classification, land use, crash rates, and bicyclist or pedestrian activity. The law emphasizes the need to consider the roadway context when setting speed limits, especially in urban areas and/or areas where vulnerable road users are present. Shortly after AB 43 was signed into law, the California Manual on Uniform Traffic Control Devices (CA MUTCD) was updated to incorporate the provisions of AB 43.
The City of Healdsburg (herein referred to as “the City”) is among the first agencies in Sonoma County to apply California’s new speed limit setting guidance to conduct a Speed Limit Reduction Evaluation (SLRE). The SLRE, which was funded as part of a USDOT Safe Streets and Roads for All (SS4A) grant awarded to SCTCA and the City, is consistent with AB 43 and the 2014 CA MUTCD, Revision 9. To determine which City-maintained roadways could be prioritized for speed limit reductions, the following CA MUTCD criteria were considered:
- 85th Percentile Speed: Eligible for 5 mph reduction if nearest 5 mph increment requires rounding down
- Safety Corridor Designation: Eligible for 5 mph reduction - Proximity to Bicyclist/Pedestrian Generators: Eligible for 5 mph reduction - Business Activity District Designation: Eligible for 25 or 20 mph prima facie speed limit - School Zone Designation: Eligible for 15 and 25 mph prima facie speed limits - Senior Zone Designation: Eligible for 25 mph prima facie speed limit This memo describes the methodology used to conduct the City’s SLRE through two distinct processes: Engineering and Traffic Survey (E&TS) Evaluation and Prima Facie Zone Evaluation.
E&TS Evaluation
The City provided a list of 31 roadway segments to be evaluated for potential speed limit reductions through the E&TS process. This process takes the following speed limit setting criteria into account: 85th percentile speed, Safety Corridor designation, and proximity to bicyclist/pedestrian generators.
85th Percentile Speed
The E&TS process requires local agencies to first conduct an E&TS to collect vehicular speeds using a calibrated radar or other electronic speed measuring device. Per Section 2B.13, paragraph 27 of the CA MUTCD, speed surveys are to be conducted during off-peak traffic hours on a fair9.A.d Packet Pg. 217 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) City of Healdsburg
May 15th, 2025
3 weather weekday to capture “typical” conditions. Based on the cumulative measured speed data, the 85th percentile speed (i.e., the speed at which 85% of drivers are traveling at or below) is determined, then rounded according to the rules below:
1. If the nearest 5 mph increment of the 85th percentile speed requires rounding up, the posted speed limit can be rounded down to the nearest 5 mph increment below the 85th percentile speed, if no further reduction is used.
3 2. If the nearest 5 mph increment of the 85th percentile speed requires rounding down, the roadway qualifies for an additional 5 mph speed reduction (i.e., the posted speed limit can be reduced by 5 mph from the nearest 5 mph increment of the 85th percentile speed).4
Sample 85th percentile speeds and the application of the speed limit setting guidelines described above for local agency roadways and private roadways subject to the California Vehicle Code (CVC) are shown in Table 1. E&TS data from 2018 to 20255 served as the basis for the City’s SLRE.
Table 1: Examples Showing Applicability of Rounding and Additional Speed Reduction on Local Agency’s Roadways & Private Property Subjected to CVC * Note – CVC Sections 22358.7, 22358.8 & 22358.9 are applicable to local agency roadways and private properties subjected to CVC, they are not applicable to the State Highway System. Refer to Section 2B.13 for more details.
Source: CA MUTCD 2014 Edition, Revision 9, Chapter 2B, Table 2B-104(CA) 3 Further reductions that preclude this rounding do not include the “Safety Corridor” or “proximity to bicyclist/pedestrian generators” designations as described in the following sections. See CA MUTCD Section 2B.13, paragraph 12l and 12m.
4 If the speed limit to be posted has had this 5 mph reduction applied, the corresponding E&TS must document in writing the conditions and justification for the lower speed limit. These conditions should be in compliance with CVC Sections 627 and 22358.5 and approved by a registered Civil or Traffic Engineer. 5 Per the CA MUTCD, any existing E&TS that was performed before January 1, 2022 is not required to be updated until due for reevaluation five (5), seven (7), or 14 years from the date of the survey.
9.A.d
Packet Pg. 218 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) 4 City of Healdsburg
May 15th, 2025
Proximity to Bicyclist/Pedestrian Generators
Proximity to bicyclist/pedestrian generators is one of two new options to reduce the speed limit by 5 mph.6 The other option is Safety Corridor designation, which will be discussed in the following section. Per the CA MUTCD, local authorities can apply a 5-mph speed limit reduction if the roadway is adjacent to any land or facility that generates high concentrations of bicyclists or pedestrians, especially those from vulnerable groups such as children, seniors, persons with disabilities, and the unhoused.
To meet this criterion, the roadway segment must have one (1) or more bicyclist/pedestrian generators present within a distance of 1,320 feet. A list of qualifying bicyclist/pedestrian generators, which includes the presence of bicycle and pedestrian infrastructure, is provided in Table 2.
7 If the roadway segment is longer than 1,320 feet, a minimum of one (1) generator must be present for every 1,320 feet.
For the City, this criterion was satisfied through existing sidewalk infrastructure alone (i.e., every quarter mile sub-segment evaluated had sidewalk present within a quarter mile). 6 The two options for lowering the speed limit by 5 mph, “Safety Corridor” and “proximity to bicyclist/pedestrian generators” designation, are presented in tandem in the CA MUTCD, meaning that whether a roadway satisfies one or both criteria, it is eligible for a reduction of no more than 5 mph. 7 Per the CA MUTCD, crash data that demonstrates a roadway segment is within the top 20% of the local jurisdiction’s pedestrian and/or bicyclist fatalities or serious injuries over a three to five-year period can be used in lieu of one of the generators listed in Table 2. If the roadway segment is longer than 1,320 feet, a minimum of one (1) location within the top 20% of pedestrian and/or bicyclist fatal or serious injury crashes must be present for every 1,320 feet. This metric is most suitable for jurisdictions with dense pedestrian and bicyclist activity (and therefore a high concentration of crashes). This metric was not used for Vista given that the City’s pedestrian and bicyclist activity is spread out over a large geography.
9.A.d
Packet Pg. 219 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) City of Healdsburg
May 15th, 2025
5 Table 2: Requirements to Determine Land or Facility that Generates High Concentrations of Bicyclists or Pedestrians
Source: CA MUTCD 2014 Edition, Revision 9, Chapter 2B, Table 2B-106(CA) Safety Corridor Designation
Safety Corridor designation is the second of two new options (the first one being proximity to bicyclist/pedestrian generators as described above) to reduce the speed limit by 5 mph. The CA MUTCD defines a Safety Corridor as “a roadway segment within an overall roadway network where the highest number of serious injury and fatality crashes occur.” Per the CA MUTCD, Safety Corridors should not constitute more than 20% of a local jurisdiction’s overall roadway network.
As part of this evaluation, Fehr & Peers provided the City with a data-driven network of Safety Corridors eligible for this 5 mph reduction. A map of the City’s Safety Corridor Network can be found in Attachment A. The methodology and data sources used to develop this network can be found in Attachment B.
9.A.d
Packet Pg. 220 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) 6 City of Healdsburg
May 15th, 2025
Prima Facie Zone Evaluation
In addition to the potential reductions explored through the E&TS process, candidate roadways were also identified based on prima facie zone eligibility. Each prima facie zone has a corresponding speed limit and a unique set of conditions that must be met for a local agency to declare a prima facie speed limit. Many prima facie zones are exempt from certain speed trap provisions and therefore do not require an E&TS for radar enforcement. The following prima facie zone types were considered as part of this evaluation: Business Activity District, School Zone, and Senior Zone.
Business Activity District Designation
Per the CA MUTCD, local authorities can declare, by ordinance or resolution, a 25 or 20 mph prima facie speed limit on a roadway contiguous to a Business Activity District if the roadway has four (4) or fewer travel lanes and meets one of the following conditions:
1. Maximum posted speed limit of 30 mph immediately prior to and after the Business Activity District, if establishing a 25 mph prima facie speed limit.
2. Maximum posted speed limit of 25 mph immediately prior to and after the Business Activity District, if establishing a 20 mph prima facie speed limit.
The CA MUTCD defines a Business Activity District as “the portion of a highway and the property contiguous thereto that includes central or neighborhood downtowns, urban villages, or zoning designations that prioritize commercial land uses at the downtown or neighborhood scale.” To qualify as a Business Activity District, an area must meet at least three (3) of the following four (4) requirements:
1. No less than 50% of the contiguous property fronting the highway consists of retail or dining commercial uses, including outdoor dining, that open directly onto sidewalks adjacent to the highway.
2. Parking, including parallel, diagonal, or perpendicular spaces, located alongside the highway.
3. Traffic control signals or stop signs regulating traffic flow on the highway, located at intervals of no more than 600 feet.
4. Marked crosswalks not controlled by a traffic control device.
Any roadway located within Downtown Healdsburg was evaluated for Business Activity District eligibility. City staff defines Downtown Healdsburg as the area bordered by Grove/Vine Street to the west, Grant Street to the north, Center Street and East Street to the east, and Mill Street to the south. A map of all roadway segments eligible for Business Activity District designation can be found in Attachment C.
9.A.d
Packet Pg. 221 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) 7 City of Healdsburg
May 15th, 2025
School Zone Designation
Per the CA MUTCD, local authorities can declare, by ordinance or resolution, a 20 or 15 mph prima facie speed limit within 500 feet of school grounds and an extended 25 mph prima facie speed limit within 500 to 1,000 feet from school grounds if the following criteria are met:
1. Roadway is in a residential district.
2. Roadway has a maximum posted speed limit of 30 mph before and after the school zone.
3. Roadway has a maximum of two (2) through traffic lanes (one in each direction or two in one direction).
In California, school speed limits apply when children are present. If the school grounds are separated from the roadway by a fence, gate, or other physical barrier, the school speed limits should be enforced when children are going to or leaving the school, either during school hours or during the noon recess hour. If the school grounds are not separated from the roadway by a fence, gate, or other physical barrier, the school speed limits should be enforced whenever the school grounds are in use by children.8 Enforcement of school speed limits is ultimately at the discretion of the police officer.
Any roadway contiguous to a school building or school grounds in the city was evaluated for school zone eligibility. A map of all eligible school zones can be found in Attachment D.
Senior Zone Designation
Per the CA MUTCD, local authorities can establish a 25 mph prima facie speed limit in a senior zone. The CA MUTCD defines a senior zone as “an area approaching or passing a senior center building or other facility primarily used by senior citizens, or the grounds thereof that is contiguous to a highway.”
Matheson Street, which is contiguous to the Healdsburg Senior Center, and Grove Street, which is contiguous to Healdsburg Senior Living, were evaluated for senior zone eligibility. A map of all eligible senior zones can be found in Attachment E.
Speed Limit Recommendations
Based on the results of the SLRE, City staff recommends a posted speed limit reduction of at least 5 mph on 27 of the 31 roadway segments evaluated. Full evaluation results and recommendations from City staff can be found in Attachment F. In accordance with CVC Section 22358.6, paragraph 12c, all recommended speed limits are within 12.4 mph of the 85th percentile speed on their respective roadways.
8 CA MUTCD 2014 Edition, Revision 9, Section 7B.15, paragraph 31
9.A.d
Packet Pg. 222 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Attachment A – Safety Corridor
Network
9.A.d
Packet Pg. 223 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Tayman
Park
Sherman St
Grant St
Sanns Ln
Plaza St
Fitch St
Harold Ln
Monte Vista Ave
University Ave
North St
Tucker St
Healds
b
u
rg
Ave
Healdsburg Ave
Powell Ave
First St
Dry Creek Rd
Mill St
F
r
o
nt
St
College St
East St
Matheson St
G
r
o
v
e
S treet/Vi
n
e
St
Grove
S
t
Piper St
March Ave
S Fitch Mountain Rd
Center St
Safety Corridor Network
City of Healdsburg
Safety Corridor
9.A.d
Packet Pg. 224 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Attachment B – Safety Corridor
Methodology
9.A.d
Packet Pg. 225 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) B-1
Safety Corridor Guidance Considerations
A Safety Corridor is defined as a roadway segment within an overall roadway network where the highest number of fatal and serious injury (KSI) crashes occur. Per the CA MUTCD, Safety Corridors should represent a prioritized subset of a local jurisdiction’s overall roadway network and therefore cannot exceed 20% of the local jurisdiction’s roadways. A Safety Corridor Network should be consistent with the following requirements:
• Developed using at least one of the crash weighting factors listed in Table B1 • Identifies specific locations with high crash occurrences • Identifies corridor-level segments with a pattern of crash reoccurrence • Able to be stratified by mode
For more information on Safety Corridors, refer to CVC Section 22358.7(a)(1) of the CA MUTCD. 1 Table B1: Safety Corridor Factors
Source: CA MUTCD 2014 Edition, Revision 9, Chapter 2B, Table 2B-105(CA) 1 https://dot.ca.gov/-/media/dot-media/programs/safety-programs/documents/ca-mutcd/rev9/2025- camutcd-2014-rev9-all.pdf
9.A.d
Packet Pg. 226 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) B-2
Safety Corridor Data Sources and Definitions
Crash Data
The City of Healdsburg’s Safety Corridor Network was developed using the most recent five (5) years of crash data (2019-2023) from SafeTREC’s Transportation Injury Mapping System (TIMS). 2 Only injury crashes on City-maintained, at-grade public roadways were included in the analysis (i.e., Property Damage Only crashes were excluded).
Disadvantaged Communities
The California Department of Transportation’s (Caltrans) Transportation Equity Index (EQI) was used to identify transportation-based priority populations (TBPPs) at the Census block level.
TBPPs represent the populations that are most burdened by traffic exposure, but also benefit the least from the multimodal transportation network (as measured by access to destinations). The EQI integrates transportation and socioeconomic indicators into three (3) screens, all of which reflect low-income status and Tribal Land status.
Vulnerable Populations by Age
Census block group-level demographic data from the most recent five-year American Community Survey (ACS) estimates (2019-2023) were used to identify vulnerable populations in the city.
Consistent with Table 2B-105(CA) of the CA MUTCD and CalEPA’s methodology for designating disadvantaged communities, a vulnerable population was defined as a Census block group that ranks in the top 25% of the City’s overall population of seniors and youth. The CA MUTCD defines seniors as individuals age 65 and older and youth as individuals under the age of 15.
Schools
The California School Campus Database (CSCD), as well as the Schools dataset from the County of Sonoma’s Open Data Portal, were used to identify public and private schools in the city.
Safety Corridor Methodology
The methodology for developing the City of Healdsburg’s Safety Corridor Network uses a proactive approach that involves incorporating crash factors in addition to known location-based risk factors, rather than relying solely on crash history. The methodology also incorporates the Highway Safety Manual (HSM)-recommended Sliding Window method3 that is referenced in the CA MUTCD. The Sliding Window method is a network screening method that uses overlapping 2 The Transportation Injury Mapping System (TIMS) was developed by SafeTREC to provide quick, easy, and free access to California crash data, the Statewide Integrated Traffic Records System (SWITRS), that has been geo-coded by SafeTREC to make it easy to map crashes. 3 AASHTO, Highway Safety Manual, 1st Edition (2010), Chapter 4 Network Screening, p. 4-15.
9.A.d
Packet Pg. 227 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) B-3
roadway segments, or “windows,” to help smooth any errors in crash location reporting. For the City of Healdsburg, the City’s roadway network was converted into overlapping, ¼-mile segments.
Each segment was then scored based on the severity and density of crashes within 50 feet of it, as well as several other contextual factors. The scoring factors that were applied to all roadway segments to develop the City’s Safety Corridor Network are summarized in the following sections.
Crash Factors
The methodology used involves assigning a weight to certain types of crashes. For this analysis, each crash was assessed based on the following factors: crash severity, mode, and victim age.
Crash Severity
The scoring factor with the greatest influence on Safety Corridor prioritization is crash severity.
Crash severity weights were derived from 2024 Caltrans Local Roadway Safety Manual (LRSM) crash costs by crash severity level. This method is similar to the HSM Equivalent Property Damage Only (EPDO) weighting method,4 except it uses the “Complaint of Pain” severity level as its baseline since Property Damage Only (PDO) crashes were not included.
Cost assumptions included in the 2024 Caltrans LRSM are based on costs from the HSM First Edition, with costs adjusted to 2024 dollars. The HSM uses “comprehensive” or “societal” crash costs to associate crash costs with each crash severity level. Comprehensive costs include both economic costs and monetized pain and suffering costs. Economic costs are monetary costs associated with emergency services deployment, medical services, congestion impacts from a crash, productivity loss due to victim injury, insurance and legal costs, and property damage costs.
Monetized pain and suffering costs are an assumption of the costs associated with lost quality of life (or Quality-Adjusted Life Years), accounting for reductions in life expectancy and quality of life changes as a result of a crash.
Table B2 lists the estimated crash costs and weights for each severity level. This methodology uses all injury crashes in the Safety Corridor Network development process (as opposed to KSI crashes only).
4 The equivalent property damage only (EPDO) method assigns weighting factors related to the societal costs of fatal, injury, and property damage only crashes to crashes by severity to develop an equivalent property damage only score that considers frequency and severity of crashes. https://safety.fhwa.dot.gov/local_rural/training/fhwasa14072/sec4.cfm
9.A.d
Packet Pg. 228 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) B-4
Table B2: Crash Weights by Severity
Severity Crash Cost Crash Weight
Fatal and Severe Injury (KSI) $2,860,000* 26
Evident Injury – Other Visible $193,000 2**
Possible Injury – Complaint of Pain $110,000 1
*The fatal and severe injury (KSI) crash cost is an average of the location type costs (signalized intersections, nonsignalized intersections, roadway). **Rounded to the nearest whole number.
Vulnerable Victim Factors
Two (2) additional crash factors, mode and victim age, were also considered to account for discrepancies in crash reporting, specifically for vulnerable road users. As discussed in the Recommendations for California Statewide Guidance on High Injury Networks report,5 because police assessment of injury severity is based on an officer’s primarily visual assessment of a victim at the scene of a crash, victim injuries are commonly underreported. To offset some of those reporting discrepancies and prioritize vulnerable road users, crashes involving a bicyclist or pedestrian and/or a CA MUTCD-defined youth or senior victim were assigned a weight of 3 for a maximum potential vulnerable victim score of 6. The goal of this additional weight was to elevate the score for a crash reported as non-severe (evident injury or possible injury) if the crash involved a vulnerable road user.
Once a crash score had been assigned to each crash, each crash was then associated with a roadway segment(s) using a 50-foot buffer. Crashes within 50 feet of two roadway segments (e.g., at an intersection) were assigned twice, once to each segment. As shown in Table B3, the cumulative crash score for a single crash (taking into account crash severity and vulnerable victims involved) can range from 1 to 32.
Location-Based Risk Factors
In addition to the crash factors described above, three (3) location-based risk factors were evaluated for each roadway segment: disadvantaged communities, vulnerable populations by age, and school proximity. The predictive, contextual nature of these factors can help to identify locations with high risk, rather than just locations with a history of KSI crashes. Segments within a disadvantaged community, a vulnerable population (by age), or a quarter mile of a school were assigned a weight of 3 for a maximum potential risk score of 9. For more information on the underlying data and methodologies used to assess these factors, see Safety Corridor Data Sources and Definitions on page B-2.
5 https://scag.ca.gov/sites/main/files/file-attachments/cal-guidance-hin-090221.pdf?1633549750
9.A.d
Packet Pg. 229 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) B-5
Overall Score: Safety Index
Cumulative scores for both crash and location-based risk factors were then summed together to calculate an overall Safety Index for each roadway segment. Based on the scoring for each variable shown in Table B3, the largest emphasis is on KSI crashes, with the other crash and location-based factors adding a nuance to the scoring that provides minor distinctions between the final scores for each segment. This nuance can help to manage the number of corridors that meet the cutoff for the final Safety Corridor Network without exceeding the CA MUTCD threshold of 20%.
Table B3: Safety Corridor Network Scoring
Variable Value Score
Crash Factors
Crash Severity Factor | Applied to Crash
Fatal and Severe Injury (KSI) 0 or 1 26
Evident Injury – Other Visible 0 or 1 2
Possible Injury – Complaint of Pain 0 or 1 1
Vulnerable Victim Factors | Applied to Crash
Mode: involves bicyclist or pedestrian 0 or 1 3
Victim Age: involves victim* age 65+ or under 15
(based on crash victim data from SANDAG) 0 or 1 3
Risk Factors
Location-Based Factors | Applied to Segment
Disadvantaged Community 0 or 1 3
Vulnerable Population: age 65+ or under 15
(based on Census tract-level data from ACS) 0 or 1 3
School Proximity (within ¼ mile) 0 or 1 3
*A victim is defined as any person killed or injured as the result of a crash.
Building the Network
Once a Safety Index had been assigned to each roadway segment, the highest scoring segments were identified according to CA MUTCD guidance, which states that Safety Corridors should not constitute more than 20% of the overall roadway network. Healdsburg’s Safety Corridor Network constitutes 19.9% of the overall roadway network and accounts for 100% of KSI crashes.
Smoothing the Network
Finally, a “smoothed” network was created by filling gaps and correcting anomalies in the resulting Safety Corridor Network. Any Safety Corridor links less than 1,000 feet in length were removed from the final network. If a non-Safety Corridor link less than ½ mile existed between
9.A.d
Packet Pg. 230 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) B-6
two (2) Safety Corridor links, it was added to the final network. Consideration was also given to locations where the City plans to implement additional bicycle and/or pedestrian infrastructure if adjacent to a Safety Corridor link.
9.A.d
Packet Pg. 231 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Attachment C – Eligible Business
Activity District Segments
9.A.d
Packet Pg. 232 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Plaza Park
North St
Grove St
Healdsburg Ave
H
eald
sb
u
rg
Ave
Tucker St
Plaza St
Grant St
Fitch St
Mill St
Matheson St
Piper St
East St
Center St
Center St
Grove Street/VineSt
Grove Street/Vine St
Eligible Business Activity District Segments
City of Healdsburg
Eligible Business Activity District Segments
Downtown Healdsburg
9.A.d
Packet Pg. 233 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Attachment D – Eligible School
Zones
9.A.d
Packet Pg. 234 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Tayman
Park
Grant St
Sanns Ln
Plaza St
F
i
t
c
h
S
t
Harold Ln
Monte VistaAve
University Ave
North St
Tucker St
Healds
b
u
rg
Ave
Healdsburg Ave
Powell Ave
First St
Dry Creek Rd
Mill St
F
r
o
nt
St
College St
East St
Matheson St
G
r
o
v
e
S treet/Vi
n
e
St
Grove
S
t
Piper St
March Ave
S Fitch Mountain Rd
Center St
Eligible School Zones
City of Healdsburg
Eligible School Zones
Schools
9.A.d
Packet Pg. 235 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Attachment E – Eligible Senior
Zones
9.A.d
Packet Pg. 236 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Tayman
Park
Grant St
Sanns Ln
Plaza St
F
i
t
c
h
S
t
Harold Ln
Monte Vista Ave
University Ave
North St
Tucker St
Healds
b
u
rg
Ave
Healdsburg Ave
Powell Ave
First St
Dry Creek Rd
Mill St
F
r
o
nt
St
College St
East St
Matheson St
G
r
o
v
e
S treet/Vi
n
e
St
Grove
S
t
Piper St
March Ave
S Fitch Mountain Rd
Center St
Eligible Senior Zones
City of Healdsburg
Eligible Senior Zones
Senior Facilities
9.A.d
Packet Pg. 237 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Attachment F – Results and
Recommendations
9.A.d
Packet Pg. 238 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Street From To Existing Speed
Limit
Maximum
Allowable Posted
Speed Reduction
Maiximum
Allowable Reduced
Speed Limit
Recommended
Speed Limit
Speed Limit Reduction Scoring
Criteria
Recommendation Justification
Healdsburg Avenue Northern City Boundary Parkland Farms Boulevard 40 5 35 35 Safety Corridor, Bike/Ped Generator Recommend full reductionHealdsburg Avenue Parkland Farms Boulevard Dry Creek Road 35 5 30 30 Rounding Down, Bike/Ped Generator Recommend full reduction Healdsburg Avenue Dry Creek Road Powell Avenue 35 5 30 30 Rounding Down, Safety Corridor, Bike/Ped Generator Recommend full reduction Healdsburg Avenue Powell Avenue Grant Street 30 5 25 25 Rounding Down, Safety Corridor, Bike/Ped Generator Recommend full reduction
Healdsburg Avenue Grant Street Piper Street 25 5 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHHealdsburg Avenue Piper Street Mill Street 25 5 20 20 Safety Corridor, Bike/Ped Generator Recommend full reductionHealdsburg Avenue Mill Street Exchange Avenue 30 5 25 25 Safety Corridor, Bike/Ped Generator Recommend full reductionHealdsburg Avenue Exchange Avenue Front Street 25 0 25 25 Safety Corridor, Bike/Ped Generator No reduction allowed per evaluationHealdsburg Avenue Healdsburg Ave Bridge (East) Bailhache Avenue 30 5 30 30 Safety Corridor, Bike/Ped Generator Retain 30 mph to create a smoother transition between speed zone to the southHealdsburg Avenue Bailhache Avenue Southern City Boundary 45 10 35 35 Safety Corridor, Bike/Ped Generator Recommend full reduction Piper Street Tee Drive Healdsburg Avenue 25* 10 15 25 Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Mill Street East Street US Highway 101 30 5 25 25 Safety Corridor, Bike/Ped Generator Recommend full reduction East Street Dryer Street Piper Street 25* 10 15 25 Rounding Down, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Dry Creek Road US Highway 101 Healdsburg Avenue 30 5 25 25 Safety Corridor, Bike/Ped Generator Recommend full reduction March Avenue Healdsburg Avenue Woodside Court 30 5 25 25 Bike/Ped Generator Recommend full reduction Matheson Street Western City Boundary Williamson Wines 25* 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsMatheson Street Williamson Wines Healdsburg Avenue 25 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsMatheson Street Healdsburg Avenue East Street 25 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsMatheson Street East Street Fitch Street 25 10 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHMatheson Street Fitch Street Heron Drive 25 5 25 25 Rounding Down, Bike/Ped Generator
No reduction allowed per evaluation
South Fitch Mountain Road Heron Drive Eastern City Boundary 35 5 30 30 Bike/Ped Generator Recommend full reduction Powell Avenue Healdsburg Avenue University Street 25 5 20 25 Rounding Down, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHPowell Avenue University Street Eastern City Boundary 30 5 25 25 Rounding Down, Bike/Ped Generator Recommend full reduction Front Street Healdsburg Avenue Mason Street 25 0 25 25 Safety Corridor, Bike/Ped Generator No reduction allowed per evaluation First Street Mason Street Piper Street 25* 5 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Fitch Street Powell Avenue Matheson Street 25 5 20 25 Safety Corridor, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Fitch Street / Harmon
Street / Hudson Street
Matheson Street Front Street 25 5 20 25 Rounding Down, Bike/Ped Generator
Outside of downtown core - recommend keep at 25 MPH
9.A.d
Packet Pg. 239
Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Street From To Existing Speed
Limit
Maximum
Allowable Posted
Speed Reduction
Maiximum
Allowable Reduced
Speed Limit
Recommended
Speed Limit
Speed Limit Reduction Scoring
Criteria
Recommendation Justification
Grove Street Healdsburg Avenue Dry Creek Road 30 5 25 25 Bike/Ped Generator Recommend full reductionGrove Street Dry Creek Road West Grant Street 30 10 20 25 Rounding Down, Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH. Will re- review after Grove Street project has been constructed.
Grove Street / Vine Street West Grant Street Mill Street 30 5 25 25 Bike/Ped Generator Recommend full reduction Center Street Powell Avenue North Street 25 5 20 25 Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPHCenter Street North Street Mill Street 25 5 20 20 Bike/Ped Generator Recommend full reduction Grant Street Grove Street University Street 25 5 20 25 Bike/Ped Generator Outside of downtown core - recommend keep at 25 MPH Plaza Street Healdsburg Avenue Center Street 25 10 15 20 Safety Corridor, Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segmentsPlaza Street Center Street Eastern Terminus 25* 10 15 20 Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segments North Street Grove Street / Vine Street East Street 25* 10 15 20 Bike/Ped Generator Recommended 20 MPH in downtown core to be consistent with other 20 MPH segments * This speed limit is not currently posted.
9.A.d
Packet Pg. 240
Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Tayman
Park
Sanns Ln
Plaza St
Fit
c
h
S
t
Healdsburg Memorial Bridge
Monte Vista Ave First St
University Ave
Heald
s
b
u
rg
Av
e
Healdsburg Ave
Piper St
Tucker St
Healdsburg Ave
Harold Ln
East St
Matheson St
North St
Center St
North St
Dry Creek Rd
Grant St
Mill St
F
r
o
nt
St
College St
G
r
o
v
e
S treet/Vin
e
St
G
r
o
v
e
St
Powell Ave
March Ave
S Fitch Mountain Rd
Recommended Posted Speed Limits
City of Healdsburg
Recommended Posted Speed Limits (Excluding School Zones) 20 mph
25 mph
30 mph
35 mph
Corridors Evaluated – No Changes Recommended (Excluding School Zones)
9.A.d
Packet Pg. 241 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Tayman
Park Grant St
Sanns Ln
Plaza St
Fit
c
h
S
t
Harold Ln
Healdsburg Memorial Bridge
Monte Vista Ave
East St
North St First St
Tucker StUniversity Ave
Heald
sburg Ave He
a
ldsburgAve
Piper St
Powell Ave
HealdsburgAve
Center St
North St
Dry Creek Rd
Mill St
Fr
o
nt St
College St
Matheson St
Gro
v
e
S treet/Vine St
Grove
S
t
March Ave
S Fitch Mountain Rd
Recommended Reduction from May 2025 Speed Limits
City of Healdsburg
May 2025 Recommended Speed Limit Reductions Amongst Streets Evaluated (Excluding School Zones) 0 mph
5 mph
10 mph
9.A.d
Packet Pg. 242 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation) Tayman
Park
Sanns Ln
Plaza St
Fit
c
h
S
t
Healdsburg Memorial Bridge
Monte Vista Ave
First St
University Ave
Heald
s
b
urg
Av
e
Heal dsburgAve
Piper St
Tucker St
Healdsburg Ave
Harold Ln
East St
Matheson St
North St
Center St
North St
Dry Creek Rd
Grant St
Mill St
Fr
o
nt St
College St
G
r
o
v
e
S treet/Vine St Gr
o
v
e
St
Powell Ave
March Ave
S Fitch Mountain Rd
Recommended Posted Speed Limits
City of Healdsburg
Recommended Speed Limits (Including School Zones)
15 mph (when children are present as defined by CA MUTCD) 20 mph
25 mph
30 mph
35 mph
Corridors Evaluated – No Changes Recommended (Including School Zones) Schools
9.A.d
Packet Pg. 243 Attachment: Technical Memorandum Speed Limit Reduction Evaluation Summary (4890 : Speed Limit Reduction Evaluation)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Healdsburg Electrification Energy and Demand Forecasting 2025-2045 PREPARED BY: Terra Sampson, Utility Conservation Analyst STRATEGIC INITIATIVE(S):
Pursue Initiatives that Promote Environmental Stewardship Maintain and Improve Infrastructure and Facilities
RECOMMENDED ACTION(S):
1. Receive an informational report on the long-range energy and demand forecast to estimate future electricity consumption demands resulting from adoption rates of building and transportation electrification, and to inform the amount of new energy sources and system capacity improvements required.
2. Adopt a resolution accepting the "Most Likely" scenario forecast, with a planning margin, from the community-wide energy and demand forecasting and directing the Utility Director to bring forward additional renewable and zero-carbon resources for City Council consideration to meet State requirements.
COMMUNITY ENGAGEMENT/OUTREACH:
The development of a long-range electric energy and demand forecast was included in the Climate Mobilization Strategy (CMS), which involved a significant amount of outreach. In development of a long-range electric energy and demand forecast, staff held a public workshop in January 2025, to discuss initial results and was also invited to a Climate Action Healdsburg meeting in March 2025, to present initial results. Additionally, staff implemented an online survey in March 2025, to gather more public feedback on electrification adoption for incorporation into the final energy forecast.
BACKGROUND:
In October 2023, the City Council adopted the CMS. The adopted CMS includes measure BE1.1 to develop a long-range electric energy and demand forecast. This forecast is needed to guide the City in purchasing new renewable energy resources and the reconstruction of the City’s electric system ahead of the higher electric demands created by building and transportation electrification.
9.B
Packet Pg. 244
In February 2024, the City Council approved a Professional Service Agreement (PSA) with Rincon Consultants, Inc. (Rincon) to assist in the development of long-term energy and demand forecasts. Rincon and staff completed initial scenario forecasts and presented those results during a public workshop held in January 2025. In March 2025, the City Council approved an expanded scope with Rincon to further develop the scenario forecasts. In the development of the initial scenario forecasts, staff identified key areas influencing forecasted electricity consumption and peak demands needing further analysis and refinement. These areas included assumptions about what time of day and how quickly electric vehicles (EVs) will charge, impact of customer-owned solar, refinement of daily electricity consumption curves, and other improvements to the model’s assumptions. These adjustments were critical to creating accurate scenario forecasts to inform significant near-term and long-term financial decisions. Rincon and staff worked together on these updates and are now presenting the final energy and demand forecasting report and results.
The scenario forecasts are heavily dependent upon EV and building electrification adoption rates. Therefore, variations in adoption rates can cause a wide range in forecasted electricity consumption and peak demands. The “Most Likely” scenario takes into consideration community survey responses, current adoption trends and rebate program participation, CMS targets, and expected State regulations. The “Most Likely” forecast indicates that Healdsburg’s annual net electricity consumption could increase by 75% (nearly double) by 2045.
DISCUSSION/ANALYSIS:
The Healdsburg Electric Department worked with Rincon to develop a 2023 baseline model of hourly electricity consumption. Scenarios with varying levels of electrification out to 2045 were then developed and applied to the baseline model, including scenarios for “Underachieve” the CMS, “Achieve” the CMS, “Overachieve” the CMS, and “Most Likely”.
The chart below shows the range of future annual net electricity consumption under the different scenarios, with a 75% increase in annual net electricity consumption in 2045 in the Most Likely scenario.
9.B
Packet Pg. 245
Annual Net Electricity Consumption (MWh) For Each Year of Each Modeled Scenario.
The above figure depicts the expected net electricity consumption of building and EVs in megawatt hours (MWh) for each year of each scenario with the inclusion of solar. Scenarios are ordered in highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend. The exact value of each individual bar is described in the graph as white text.
The model also analyzed the hours with the highest consumption to understand potential changes and increases in peak demands. The chart below shows how peak demands might change in the future, depending on heat pump adoption and EV charging behaviors. The chart is based on EV charging using a “delayed – finish by departure” (i.e., have the charging completed by a specific time, typically the early morning) charging behavior to avoid evening peak demands. Charging behavior can be influenced by time of use rates, the new Home Energy Load Management Program, and outreach and education. A key insight from the model development is that EV charging will drive future peak demands.
9.B
Packet Pg. 246
Monthly Net Peak Demand (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly net peak demand in megawatt hours (MWh) for the maximum hour net electricity consumption for buildings and EVs across each year for each scenario with solar inclusion. The legend indicates the symbol to represent the time of day peak demand occurred in a given month.
The State’s Renewable Portfolio Standard (RPS) Program and the Clean Energy, Jobs, and Affordability Act of 2022 set increasing renewable and zero-carbon requirements for electricity provided by electric utilities, such as Healdsburg Electric Department. The RPS requirement for 2030 is 60% renewable and the clean energy requirement for 2045 is 100% renewable and zerocarbon. As both the percentage requirement and electricity consumption increase, Healdsburg Electric must procure new renewable and zero-carbon resources.
The chart below illustrates the potential gap in renewable and zero-carbon resources to meet State requirements. For context, to meet the 2035 requirement of 90% clean energy (60% renewable plus 30% zero-carbon) in the Most Likely scenario, Healdsburg Electric would need an additional 23,000 MWh of solar generation (compared to current contracts), or about 52 acres of solar panels, and an approximately 4,000 MWh increase in average large hydroelectric generation, in addition to an assumed conversion of 11,000 MWh of the Lodi Energy Center fuel-generated power to green hydrogen already included in the Average Current/Planned line.
9.B
Packet Pg. 247
Comparison of Modeled Scenarios and Renewable and Zero-Carbon Procurement Needs.
The above figure depicts the annual electricity needed to meet the State requirements under the modeled scenarios in megawatt hours (MWh) and the currently planned procurement of renewable and carbon-free electricity. The gap demonstrates the renewable and zero-carbon resources that will need to be procured to meet the State requirements under the anticipated future conditions. Note that the chart only shows eligible renewables to 2030, and beginning in 2035 zero-carbon resources are also included.
This Energy and Demand Scenario Forecasting project is intended to assist Healdsburg Electric Department in planning for the future. Healdsburg Electric intends to use the findings to procure sufficient new energy resources, invest in infrastructure upgrades to accommodate the increasing electricity demands, and implement programs to help reduce grid impacts from electrification, such as the new Home Energy Load Management Program.
More detailed information about the scenario forecast development, methodology, results, and findings are included in the Energy and Demand Forecasting Report and Appendices, attached.
Staff will rely on these scenario forecasts to determine when and how much renewable energy to purchase and how much capital to invest in the City’s electric distribution system. Therefore, acceptance of these scenario forecasts becomes critical due to the significant financial commitment required to prepare for this higher electricity consumption.
Staff recommend accepting the “Most Likely” scenario plus a planning margin of 10% for annual electricity consumption to account for system losses and other aspects that were not included in the model or may be under-forecasted and a planning margin of 20% for peak
9.B
Packet Pg. 248
demands to account for instantaneous peak demands and State-required margins. City staff will work with Northern California Power Association (NCPA) to identify potential new renewable energy contracts to fill the gaps identified in the “Most Likely” scenario and bring new renewable and zero-carbon energy contracts to Council for consideration. Results from the “Most Likely” scenario will also be used to plan for necessary infrastructure upgrades, strategic program offerings (such as EV charging behaviors and leveraging battery storage), and incorporation into the next electric rates study for 2027.
ENVIRONMENTAL STEWARDSHIP:
Measure BE-1 in the CMS sets the goal to procure 85% of electricity from renewable and zerocarbon sources by 2030 (60% renewable consistent with the RPS requirement plus 15% zero carbon to achieve the CMS target) and 100% renewable and carbon-free no later than 2045. If achieved Measure BE-1 is expected to reduce GHG emissions by 2,171 metric tons of carbon dioxide equivalent (MT CO2e) in 2030 assuming modest adoption rates of building and transportation electrification. The long-range energy and demand forecasting helps inform the City as to how much renewable and zero-carbon energy is necessary to achieve this CMS measure.
ALTERNATIVES:
As an alternative, the City Council could choose to accept a different scenario presented in the Forecasting Report or direct staff to make modifications to the electrification adoption rates in the “Most Likely” scenario. Staff have been provided with the modeling tool and can make minor adjustments to the scenario inputs (such as the number of heat pumps installed or EVs added), if desired. However, adjustments that are more significant than changing the input numbers outlined in Appendix A, may require additional scope with the consultant.
FISCAL IMPACT:
The not-to-exceed amount of $114,713 for this forecasting project was covered by the Electric Operations fund (Fund 540). Acceptance of the Forecasting Report and directing staff to begin planning for the “Most Likely” scenario with a planning margin does not have a fiscal impact at this time. Staff will bring forward new energy contracts for City Council consideration and present the potential contract costs at that time. Any new program offerings or substantial updates to existing programs that impact the authorized program budget will be presented to City Council along with an explanation of the funding source for the program. New infrastructure projects and improvements will be considered during the next electric rate study for 2027. While costs to meet electric system needs with increased electrification will be substantial, the additional revenue from increased electricity sales will help support these future projects.
ENVIRONMENTAL ANALYSIS:
An Energy and Demand Scenario Forecast is not subject to the provisions of the California Environmental Quality Act (CEQA) because an Energy and Demand Scenario Forecast is not a project, since it will not have a direct or reasonably foreseeable indirect impact on the environment.
ATTACHMENT(S):
Resolution
9.B
Packet Pg. 249
Healdsburg Energy and Demand Forecasting Report
Appendix A Model Inputs by Scenario
Appendix B Supporting Data for Scenario Development
Appendix C Community Electrification Survey
9.B
Packet Pg. 250
CITY OF HEALDSBURG
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HEALDSBURG ACCEPTING THE “MOST LIKELY”
SCENARIO FORECAST FROM THE COMMUNTIY-WIDE
ELECTRIC ENERGY AND DEMAND FORECASTING AND
DIRECT THE UTILITY DIRECTOR TO BRING FORWARD
ADDITIONAL RENEWABLE AND ZERO-CARBON
RESOURCES FOR CITY COUNCIL CONSIDERATION TO
MEET INCREASING STATE REQUIREMENTS
WHEREAS, the City of Healdsburg adopted a Climate Mobilization Strategy (CMS) in support of State and Regional greenhouse gas (GHG) reduction goals; and WHEREAS, the CMS Implementation Plan includes an action to conduct electrification infrastructure and capacity feasibility studies; and
WHEREAS, the CMS includes a measure to develop long-range energy forecasts based upon adoption rates for building and transportation electrification; and WHEREAS, an electric energy and demand scenario forecast is important to understand future electricity consumption and peak demands under various levels of building and transportation electrification; and
WHEREAS, California’s Renewable Portfolio Standard (RPS) program and the Clean Energy, Jobs, and Affordability Act of 2022 require electric utilities to provide increasing percentages of renewable and zero-carbon electricity to their customers, including 60% renewable by 2030, 90% renewable and zero-carbon by 2035, 95% by 2040, and 100% renewable and zerocarbon by 2045; and WHEREAS, the City Council approved a professional service agreement with Rincon Inc. for the development of long-range energy and demand scenario forecasts; and WHEREAS, Rincon has developed an energy and demand scenario forecast model and report that indicates a 75% increase (i.e., nearly doubling) in Healdsburg annual net electricity consumption by 2045 in the “Most-Likely” scenario, as well as a 44% increase in the maximum hourly consumption; and
WHEREAS, procurement needs may be at least 10% higher than the scenario results to account for transmission losses, distribution loss, planning margins, loss of generation resources, intermittent nature of some renewable energy sources, and items not included in the forecasting model; and
WHEREAS, peak demand infrastructure needs may need to be built to accommodate at
9.B.a
Packet Pg. 251 Attachment: Resolution (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Resolution No. -2025
least 5% higher peak demands than the forecasting results to account for the difference between instantaneous peak demands and modeled maximum hourly consumption, and the State requires a Resource Adequacy margin of at least 15%; and
WHEREAS, the magnitude of forecasted electricity consumption, future infrastructure investments and renewable energy resources procurement will require significant financial commitments to meet Healdsburg’s forecasted energy needs due to electrification; and WHEREAS, increased electricity consumption will generate additional revenue to help offset increased operating costs related to new renewable and zero-carbon resources as well as reinvestment in the City electric distribution system; and WHEREAS, based upon the “Most Likely” forecast, Healdsburg will have significant gaps in renewable and zero-carbon electricity generation and fall short of State RPS and clean energy requirements as both the percentage requirements and City electricity consumption increase over time; and
WHEREAS, utilizing the energy and demand scenario forecasting and making periodic forecast model updates will provide costs savings and avoid the risk of over- or under-procurement of renewable energy resources; and
WHEREAS, the “Most Likely” scenario forecast can be used to inform procurement of additional renewable and zero-carbon resources to meet State requirements, as well as propose necessary capacity improvement projects during biennial budgeting processes and rate cost-ofservice studies; and WHEREAS, energy storage systems paired with additional renewable and zero-carbon resources are essential to capture excess generation and provide reliable electricity 24/7/365 for Resource Adequacy as the City’s percentage of renewable and zero-carbon resources increases; and
WHEREAS, Healdsburg Electric programs for energy efficiency, efficient electrification, and load management – especially EV charging behaviors – can also be critical to meeting State requirements and reducing peak demands; and
WHEREAS, an Energy and Demand Scenario Forecast is not subject to the provisions of the California Environmental Quality Act (CEQA) because an Energy and Demand Scenario Forecast is not a project, since it will not have a direct or reasonably foreseeable indirect impact on the environment.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Healdsburg does hereby:
9.B.a
Packet Pg. 252 Attachment: Resolution (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Resolution No. -2025
1. Accept the “Most Likely” scenario from the Electric Energy and Demand Forecasting model and report.
2. Direct Healdsburg Electric Department staff to begin seeking additional renewable energy and zero-carbon energy resources, including energy storage resources, for further consideration by the City Council to meet State renewable and zero-carbon requirements based upon the “Most Likely” scenario forecast including a minimum 10% planning margin.
3. Find that an Energy and Demand Scenario Forecast is not subject to the provisions of the California Environmental Quality Act (CEQA) because an Energy and Demand Scenario Forecast is not a project, since it will not have a direct or reasonably foreseeable indirect impact on the environment.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Healdsburg this 2nd day of June 2025 by the following vote:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ABSTAINING: Councilmembers:
SO ORDERED: ATTEST:
_________________________________ ____________________________________ Evelyn L. Mitchell, Mayor Raina Allan, City Clerk
9.B.a
Packet Pg. 253 Attachment: Resolution (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Healdsburg Energy and Demand Forecasting
Long-Range Community Electricity Scenarios
prepared by
City of Healdsburg
Electric Department
401 Grove Street
Healdsburg, California 95448
Contact: Utilities Director
prepared with the assistance of
Rincon Consultants, Inc.
449 15th Street, Suite 303
Oakland, California 94612
May 2025
9.B.b
Packet Pg. 254 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting)
9.B.b
Packet Pg. 255 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Table of Contents
Long-Range Community Electricity Scenarios i
Table of Contents
1 Executive Summary ........................................................................................................................1 2 Introduction....................................................................................................................................4
2.1 Background on Electrification.............................................................................................4 3 Model Development.....................................................................................................................11
3.1 Intent.................................................................................................................................11
3.2 Approach...........................................................................................................................11
3.3 Methodology.....................................................................................................................14 4 Results...........................................................................................................................................26
4.1 Current Energy and Demand ............................................................................................26
4.2 Energy and Demand Scenarios .........................................................................................28 5 Findings.........................................................................................................................................54
5.1 Summary of Results ..........................................................................................................54
5.2 Expected Climate Change Impacts....................................................................................60
5.3 Challenges.........................................................................................................................61
5.4 Recommendations............................................................................................................63 Tables
Table 1 Data Sources Used ............................................................................................................12 Table 2 Scenario Conditions in 2030 and 2045 .............................................................................15 Table 3 Building Type and Stock for Current and Projected Scenarios.........................................17 Table 4 Appliances Available for Electric Transition and Potential Added Electricity Consumption by Converted Appliances in Residential Buildings........................................................................19 Table 5 Appliances Available for Conversion and Electricity Consumption by Appliance in NonResidential Buildings.....................................................................................................................20 Table 6 Additional Solar Included Each Model Year......................................................................23 Table 7 Number of EVs in Need of Charging by Scenario and Year...............................................23 Table 8 EV Parameter Inputs.........................................................................................................24 Table 9 Healdsburg Historic Net Peak Demand.............................................................................28 Table 10 Annual Electricity Consumption (MWh) by Scenario and Year ........................................32 Table 11 Peak Demand (MWh) by Scenario and Year ....................................................................44 Table 12 Potential Electricity Increase with Addition of Commercial Heat Pump Water Heaters..56 Table 13 Potential Electricity Savings with Implementation of Energy Efficiency Program............56 Table 14 Most Likely Scenario Electricity Consumption and Peak Demand with Planning Margin without Additional On-Site Solar..................................................................................................57
9.B.b
Packet Pg. 256 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
ii
Table 15 Most Likely Scenario Net Electricity Consumption and Peak Demand with Planning Margin with Additional On-Site Solar...........................................................................................57 Table 16 Comparison of Energy Efficiency Forecast and Most Likely Scenario Results for Annual Building Electricity Consumption..................................................................................................60 Table 17 Potential Electricity Consumption and Peak Demand for Most Likely Scenario under Hotter Summers ...........................................................................................................................60 Figures
Figure 1 Annual Net Electricity Consumption (MWh) for the Current Base Model Scenario. .............26 Figure 2 Net Peak Demand (MWh) for the Current Base Model Scenario...........................................27 Figure 3 Annual Building Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. 29 Figure 4 Annual Building and Electric Vehicle Electricity Consumption (MWh) For Each Year of Each Modeled Scenario.........................................................................................................................30 Figure 5 Annual Net Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. .......31 Figure 6 Monthly Building Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. .......................................................................................................................................34 Figure 7 Monthly Building and Electric Vehicle Electricity Consumption (MWh) For Each Year of Each Modeled Scenario.........................................................................................................................35 Figure 8 Monthly Net Electricity Consumption (MWh) For Each Year of Each Modeled Scenario......36 Figure 9 Annual Building Peak Demand (MWh) For Each Year of Each Modeled Scenario. ................37 Figure 10 Monthly Building Peak Demand (MWh) For Each Year of Each Modeled Scenario.............38 Figure 11 Annual Building and EV Peak Demand (MWh) For Each Year of Each Modeled Scenario. ..40 Figure 12 Monthly Building and EV Peak Demand (MWh) For Each Year of Each Modeled Scenario.41 Figure 13 Annual Net Peak Demand (MWh) For Each Year of Each Modeled Scenario. .....................42 Figure 14 Monthly Net Peak Demand (MWh) For Each Year of Each Modeled Scenario....................43 Figure 15 Monthly Net Peak Demand (MWh) for Each Year for the Most Likely Scenario Under Varying EV Charging Regimes. ......................................................................................................47 Figure 16 Example of Daily Electricity Demand Curve (MWh) on an Average Summer Day. ..............49 Figure 17 Example of Daily Electricity Demand Curve (MWh) on a Average Winter Day....................50 Figure 18 Example of Daily Electricity Demand Curve (kWh) on a Winter Peak Day. ..........................51 Figure 19 Example of Daily Electricity Demand Curve (kWh) on a Summer Peak Day.........................51 Figure 20 Example of Daily Electricity Demand Curve by Building End-use (kWh) on an Average Summer Day. ................................................................................................................................52 Figure 21 Example of Daily Electricity Demand Curve by Building End-use (kWh) on an Average Winter Day....................................................................................................................................53 Figure 22 Comparison of Modeled Scenarios and CEC Local Reliability Scenario Forecasted Potential Future Electricity Consumption. ...................................................................................................58
9.B.b
Packet Pg. 257 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Table of Contents
Long-Range Community Electricity Scenarios iii
Figure 23 Managed System Peak Demand (California ISO) from the CEC’s 2023 Integrated Energy Policy Report.................................................................................................................................59 Figure 24 Comparison of Modeled Scenarios and Renewable and Zero-Carbon Procurement Needs............................................................................................................................................62 Appendices
Appendix A Model Inputs by Scenario
Appendix B Supporting Data for Scenario Development
Appendix C Community Electrification Survey Results
9.B.b
Packet Pg. 258 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting)
9.B.b
Packet Pg. 259 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Executive Summary
Long-Range Community Electricity Scenarios 1
1 Executive Summary
To achieve the goals of Healdsburg’s Climate Mobilization Strategy (CMS), and to meet increasing market trends, it is critical for Healdsburg Electric Department to forecast potential future community electricity scenarios for increasing electricity consumption and peak demands from building and transportation electrification.
The Healdsburg Electric Department worked with Rincon Consultants, Inc. to develop a 2023 baseline model of hourly electricity consumption. Scenarios with varying levels of electrification out to 2045 were then developed and applied to the baseline model, including scenarios for “Underachieve” the CMS, “Achieve” the CMS, “Overachieve” the CMS, and “Most Likely”.
The chart below shows the range of future annual net electricity consumption under the different scenarios, with a 75% increase in annual net electricity consumption in 2045 in the Most Likely scenario.
Annual Net Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected net electricity consumption of building and EVs in megawatt hours (MWh) for each year of each scenario with the inclusion of solar. Scenarios are ordered in highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend.
The exact value of each individual bar is described in the graph as white text.
The model also analyzed the hours with the highest consumption to understand potential changes and increases in peak demands. The chart below shows how peak demands might change in the future, depending on heat pump adoption and electric vehicle (EV) charging behaviors. The chart is based on EV charging using a “delayed – finish by departure” (i.e., have the charging completed by a
9.B.b
Packet Pg. 260 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
2 specific time, typically the early morning) charging behavior to avoid evening peak demands.
Charging behavior can be influenced by time of use rates, the new Home Energy Load Management Program, and outreach and education. A key insight from the model development is that EV charging will drive future peak demands.
Monthly Net Peak Demand (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly net peak demand in megawatt hours (MWh) for the maximum hour net electricity consumption for buildings and EVs across each year for each scenario with solar inclusion.
The legend indicates the symbol to represent the time of day peak demand occurred in a given month.
The State’s Renewable Portfolio Standard (RPS) Program and the Clean Energy, Jobs, and Affordability Act of 2022 set increasing renewable and zero-carbon requirements for electricity provided by electric utilities, such as Healdsburg Electric Department. The RPS requirement for 2030 is 60% renewable and the clean energy requirement for 2045 is 100% renewable and zero-carbon.
As both the percentage requirement and electricity consumption increase, Healdsburg Electric must procure new renewable and zero-carbon resources.
The chart below illustrates the potential gap in renewable and zero-carbon resources to meet State requirements. For context, to meet the 2035 requirement of 90% clean energy (60% renewable plus 30% zero-carbon) in the Most Likely scenario, Healdsburg Electric would need an additional 23,000 MWh of solar generation (compared to current contracts), or about 52 acres of solar panels, and an approximately 4,000 MWh increase in average large hydroelectric generation, in addition to an assumed conversion of 11,000 MWh of the Lodi Energy Center fuel-generated power to green hydrogen already included in the Average Current/Planned line.
9.B.b
Packet Pg. 261 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Executive Summary
Long-Range Community Electricity Scenarios 3
Comparison of Modeled Scenarios and Renewable and Zero-Carbon Procurement Needs. The above figure depicts the annual electricity needed to meet the State requirements under the modeled scenarios in megawatt hours (MWh) and the currently planned procurement of renewable and carbon-free electricity. The gap demonstrates the renewable and zero-carbon resources that will need to be procured to meet the State requirements under the anticipated future conditions. Note that the chart only shows eligible renewables to 2030, and beginning in 2035 zero-carbon resources are also included.
This Energy and Demand Scenario Forecasting project is intended to assist Healdsburg Electric Department in planning for the future. It is recommended for Healdsburg Electric to use the findings to procure sufficient new energy resources, invest in infrastructure upgrades to accommodate the increasing electricity demands, and implement programs to help reduce grid impacts from electrification, such as the new Home Energy Load Management Program.
9.B.b
Packet Pg. 262 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
4 2 Introduction
The City of Healdsburg recently adopted the Climate Mobilization Strategy (CMS) that identified several measures, actions, and projects to implement to reduce the community’s greenhouse gas emissions (GHG) in alignment with state targets. A significant focus of the CMS is to electrify the building stock and transportation sector and further decarbonize these sectors through the increased procurement of renewable and carbon free electricity sources.
The increased demand for electricity and the focus on carbon free electricity will create new challenges for energy generation, transmission, and distribution within the city. Healdsburg Electric is responsible for procuring and delivering these energy sources for the community. To obtain and distribute adequate amounts of electricity that will meet electricity consumption and peak demand in an increasingly electrified city, a series of studies must be completed to understand electricity consumption and peak demand in the future under different electrification scenarios. Specifically, the intent of the study presented herein is to develop long-range community-wide electric energy and demand scenarios to estimate electricity consumption and peak demands under various adoption rates of building and transportation electrification.
This report details the methodology utilized to develop an energy and demand scenario forecasting model for Healdsburg Electric, and the findings of the model under several predetermined scenarios. The model was designed to help Healdsburg Electric to identify and prioritize electric capital improvement projects necessary for infrastructure changes and to develop a plan on how to obtain adequate resources to meet the demand and state renewable and carbon free energy targets.
2.1 Background on Electrification
Regulatory Drivers
Electrification efforts in Healdsburg are influenced by a range of regulatory frameworks at the federal, state, and local levels. These regulations establish the foundation for reducing GHG emissions, increasing renewable energy adoption, and improving energy efficiency to meet sustainability goals. The following sections outline key regulations driving electrification policies and initiatives.
Federal Regulations
At the federal level, the U.S. has established a range of policies to support electrification and emissions reductions:
▪ Energy Policy Act of 2005: Encourages energy efficiency and the development of renewable energy technologies. It also includes provisions for tax incentives and grants for clean energy projects.
▪ Inflation Reduction Act of 2022: Provides tax credits and rebates for electrification projects, including building retrofits, electric vehicle (EV) adoption, and clean energy investments. This act aims to accelerate electrification and decarbonization across multiple sectors. ▪ Clean Air Act: Regulates air pollutants and sets emission standards, indirectly promoting electrification as a cleaner energy alternative. Amendments under this act enable the
9.B.b
Packet Pg. 263 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Introduction
Long-Range Community Electricity Scenarios 5
Environmental Protection Agency (EPA) to establish emission limits for power plants and vehicles.
▪ Infrastructure Investment and Jobs Act (2021): Allocates funding for EV charging infrastructure, grid modernization, and clean energy technologies, making it a cornerstone for supporting electrification.
California Regulations
California has led the nation in ambitious climate policies and electrification targets:
▪ AB 32 - Global Warming Solutions Act (2006): Establishes California's commitment to reduce GHG emissions to 1990 levels by 2020 and sets the groundwork for further reductions beyond 2020. It requires comprehensive strategies, including cap-and-trade programs, low-carbon fuel standards, and electrification measures, to achieve emissions reductions. ▪ SB 100 (2018) & SB 1020 (2022): Mandates 100% zero-carbon and renewable electricity by 2045, with incremental renewable energy procurement targets along the way. It requires utilities to gradually increase the share of renewables and zero-carbon sources in their energy portfolios (e.g., 60% renewable by 2030, 90% renewable and zero-carbon by 2035, 95% by 2040).
▪ Advanced Clean Cars Program: Requires automakers to produce increasing numbers of zeroemission vehicles (ZEVs). The program phases out gasoline-powered cars by 2035, aligning with California's electrification goals.
▪ Title 24 Building Standards: Establishes energy efficiency standards for new and existing buildings, including requirements for solar photovoltaic (PV) systems, electric-ready infrastructure, and high-performance insulation to reduce energy demand and promote electrification.
▪ CALGreen Building Code: Introduces measures for energy efficiency, EV charging readiness, and low-emission building materials. It includes mandates for pre-wiring EV charging stations and renewable-ready features in new construction.
▪ Executive Order B-55-18: Sets a goal of statewide carbon neutrality by 2045, emphasizing electrification and renewable energy adoption to achieve significant GHG reductions. ▪ Zero-Emission Space and Water Heater Standards (under development for proposal): In a phased approach, new space or water heaters sold in California would be required to be zeroemission units. This regulation is part of California’s strategy to achieve carbon neutrality by 2045.1
California Environmental Quality Act
The California Environmental Quality Act (CEQA) requires projects to analyze and mitigate environmental impacts, including GHG emissions. Electrification is often included as a mitigation strategy to comply with CEQA requirements and reduce carbon footprints in new developments.
Projects may incorporate electrification technologies such as heat pumps and EV charging infrastructure to meet environmental standards and streamline approvals. 1 Zero-Emission Space and Water Heater Standards | California Air Resources Board
9.B.b
Packet Pg. 264 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
6 Local Regulations
The Bay Area Air Quality Management District (BAAQMD) regulates stationary sources of air pollution in the nine counties that surround San Francisco Bay2. The Board oversees policies and adopts regulations for the control of air pollution, such as nitrogen oxides (NOx) within the district.
While Healdsburg is located in the North Sonoma County Air Pollution Control District, the regulations overseen by BAAQMD can impact surrounding air districts and areas and thereby influence Healdsburg. On March 15, 2023 the BAAQMD Board adopted amendments to Rule 9-4:
Nitrogen Oxides from Fan Type Residential Central Furnaces and Rule 9-6: Nitrogen Oxides Emissions from Natural Gas-Fired Boilers and Water Heaters. 3 These rules govern point of sale
emission standards for small, typically residential and commercial, water and space heating systems.
Emissions of nitrogen oxides impact local and regional air quality and contribute to the formation of ozone and secondary particulate matter.
Rules 9-6 and 9-4 are expected to change market demand for water and space heating appliances in the Bay Area and surrounding areas. NOx-emitting gas appliances are currently the default appliance option for heating and cooling space and water across California. As the updated Rules take effect in a phased approach, for NOx-emitting gas water heaters and furnaces that start to fail or “burnout,” the Rules mandate that they may only be replaced with zero-NOx appliances in BAAQMD areas. Electric appliances are currently the only zero-NOx technologies available on the market. Heat pump water heaters (HPWH) and heat pump heating, ventilation, and air conditioning systems (HP HVAC) are currently the most cost-effective appliance options of these electric options.
Accordingly, HPWH and HP HVAC installations are expected to increase significantly across the Bay Area beginning in 2027 and 2029.
Additionally, Sonoma County has adopted various climate and electrification policies aimed at reducing GHG emissions and transitioning to cleaner energy:
▪ Sonoma Climate Mobilization Strategy: Sonoma County’s Regional Climate Protection Authority has adopted goals to achieve carbon neutrality by 2030.4 The County's goals include increasing building energy efficiency, expanding renewable energy use, transitioning equipment from fossil fuels to electricity, reducing travel demand through focused growth, and increasing carbon sequestration.
▪ Climate Action and Resiliency Division: Sonoma County provides financing options and free consultations for energy projects.
Healdsburg has implemented several local regulations to promote electrification and reduce GHG emissions:
▪ Electrification Reach Code: In 2019 and 2022, Healdsburg adopted an Electrification Reach Code requiring all new residential and commercial buildings to utilize electric space and water heating systems.5 This ordinance aimed to reduce natural gas consumption in new construction, aligning with the city's sustainability goals. Enforcement has been paused, following a federal court 2 The Bay Area refers to all BAAQMD governed geographic regions across the Bay Area’s nine counties: San Francisco, San Mateo, Santa Clara, Alameda, Contra Costa, Solano, Napa, Sonoma, and Marin County. Healdsburg is part of NSCAPCD, just north of BAAQMD area. 3 Bay Area Air Quality Management District (BAAQMD). Regulation 9 Rule 6: Nitrogen Oxides Emissions from Natural Gas-Fired Water Heaters - 2023 Amendment (Current). Available at: https://www.baaqmd.gov/rules-and-compliance/rules/reg-9-rule-6-nitrogen-oxidesemissions-from-natural-gasfired-water-heaters?rule_version=2021%20Amendment 4 Sonoma. Climate Mobilization Strategy (Adopted 2021). Available at: https://rcpa.ca.gov/wp-content/uploads/2020/12/SonomaClimate-Mobilization-Strategy-Adopted-2021-03-08.pdf 5 City of Healdsburg. 2022 Electrification Reach Code (2022). Available at:
https://ci.healdsburg.ca.us/DocumentCenter/View/15534/Healdsburg-2022-Electrification-Reach-Code
9.B.b
Packet Pg. 265 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Introduction
Long-Range Community Electricity Scenarios 7
ruling indicating that local ordinances preventing the use of gas appliances are overridden by federal law.
▪ Climate Mobilization Strategy (CMS): Adopted in October 2023, the CMS outlines measures to reduce carbon emissions by 2030.6 Key initiatives include procuring electricity from renewable and zero-carbon sources, electrifying new buildings, and retrofitting existing structures to reduce GHG emissions.
▪ Implementation Plan: As part of the CMS, Healdsburg developed an Implementation Plan detailing key actions.7
Market Trends
The shift toward electrification in residential and commercial building systems, as well as the adoption of EVs, is significantly reshaping the energy landscape in California and beyond. Key trends highlight the growing role of heat pump technologies, such as HPWH and HP HVAC, in the transition to a decarbonized economy.
Electric Water Heaters and Space Heating
In California, the adoption of electric water heaters and electric space heating systems has been rapidly increasing with growing heat pump technology. Between 2009 and 2019, the number of electric water heaters installed almost doubled, rising from 6 percent to 11 percent of the market share. Similarly, the penetration of electric space heating systems, which include air source heat pumps (ASHP), grew from 5 percent to 20 percent of homes during the same period.8 This increase is a response to both climate goals and market incentives. Notably, air source heat pumps are becoming more widespread, offering energy efficiency gains, and reducing reliance on fossil fuels for heating and hot water production.
Heat Pump Market Dynamics
The global supply chain for heat pump technologies is complex, with key manufacturing hubs spanning across the U.S. and other parts of the world. U.S.-based manufacturers have become significant players in the production of heat pumps, contributing to the country's role as a net exporter of heat pump technologies, especially to Europe.9 The market for HPWH and HP HVAC systems has been bolstered by both federal and state incentives, which support consumer adoption and reward the transition from gas-fired appliances to electric heat pump alternatives.10 HP HVAC systems, which offer both heating and cooling, currently exhibit higher market penetration (20 percent) than HPWHs (11 percent).11 This is largely due to increasing demand for air conditioning in the context of a warming climate and the relative maturity of the technology. In 6 City of Healdsburg. Climate Mobilization Strategy (2023). Available at: https://healdsburg.gov/DocumentCenter/View/17326/AdoptedHealdsburg-CMS-Compiled 7 City of Healdsburg. Implementation Plan (2023). Available at: https://healdsburg.gov/DocumentCenter/View/17328/Appendix-DImplementation-Plan-Adopted 8 California Heat Pump Residential Market Characterization and Baseline Study - https://pda.energydataweb.com/#!/documents/2625/view
9 https://www.energy.gov/sites/prod/files/2016/04/f30/30005_Mann_040716-1105.pdf 10New Buildings Institute (HWPH Market Transformation Scenarios): https://newbuildings.org/heat-pump-water-heater-sales-in-2022- signal-a-decisive-shift-in-water-heating-trends/; https://www.calmac.org/publications/OD-CPUC-Heat-Pump-Market-Study-Report-5-17- 2022.pdf
11 https://www.technologyreview.com/2024/02/12/1087970/heat-pumps-hot/; Building Decarb Coalition. https://buildingdecarb.org/wp-content/uploads/Heat-Pump-Shipment-Report-Spring-2023_V4.pdf
9.B.b
Packet Pg. 266 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
8 contrast, HPWHs, while commercially available for only about a decade, have experienced significant growth in the last three years despite still having a modest market share of approximately 1 percent. Sales of gas water heaters have been on the decline, with electric water heaters, including heat pump water heaters, overtaking gas models in December 2023 for the first time.12
Decarbonization and Electricity Resources
As California and other jurisdictions implement ambitious decarbonization goals, such as those set forth in the California Climate Scoping Plan, demand for heat pumps is expected to increase exponentially.13 This will require careful electric utility planning to meet increased electricity consumption and changing peak demands.
Benefits to Electrification
Building and transportation electrification provide several benefits such as those summarized below:
▪ Health: Commonly used appliances that burn gas, including stoves, heating systems, and water heaters, emit hazardous air pollutants inside a home when improperly ventilated, or when leaks occur. These can include nitrogen oxides, sulfur oxides, carbon monoxide, formaldehyde, particular matter and other harmful pollutants that increase the risk of respiratory disease.14,15,16,17 Given that Californians spend 70 percent of a given day indoors,18 indoor air quality is an important health consideration for many. Gas usage in buildings causes outdoor air pollution as well and has generated six times more nitrogen oxides emissions than all in-state power plants combined.19 Outdoor air pollution from buildings has been linked to pre-mature deaths in California.20
▪ Safety: Gas infrastructure carries an inherent safety risk due to the volatile nature of gas, including risk of methane leakage, damage during earthquakes, accidental explosions, or fires. 12 https://newbuildings.org/heat-pump-water-heater-sales-in-2022-signal-a-decisive-shift-in-water-heating-trends/; https://www.ahrinet.org/system/files/2024-02/December%202023%20Statistical%20Release.pdf 13 https://efiling.energy.ca.gov/GetDocument.aspx?tn=242595 14 Krasner, A., Jones, T. S., & La Rocque, R. (2021). Cooking with Gas, Household Air Pollution, and Asthma: Little Recognized Risk for Children. Journal of Environmental Health, 83(8), 14-18. https://www.proquest.com/scholarly-journals/cooking-with-gas-householdairpollution-asthma/docview/2505418593/se-2?accountid=201395 15 Seals, B., & Krasner, A. (2020). Health Effects from Gas Stove Pollution. Rocky Mountain Institute, Physicians for Social Responsibility, Mothers Out Front, and Sierra Club. https://rmi.org/insight/gasstoves-pollution-health 16 4 Zhao, H., Chan, W. R., Cohn, S., Delp, W. W., Walker, I. S., & Singer, B. C. (2020) Indoor air quality in new and renovated low-income apartments with mechanical ventilation and natural gas cooking in California. International Journal of Indoor Environment and Health, 31(3), 717-729. https://doi.org/10.1111/ina.12764
17 Logue, J. M., Klepeis, N. E., Lobscheid, A. B., & Singer, B. C. (2014) Pollutant exposures from natural gas cooking burners: A simulationbased assessment for Southern California. Environmental Health Perspectives, 122(1), 43-50. https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3888569/
18 Klepeis, N. E., Nelson, W. C., Ott, W. R., Robinson, J. P., Tsang, A. M., Switzer, P., ... & Engelmann, W. H. (2001). The National Human Activity Pattern Survey (NHAPS): a resource for assessing exposure to environmental pollutants. Journal of Exposure Science & Environmental Epidemiology, 11(3), 231-252.
19 California Air Resources Board. 2016 SIP Emission Projection Data: 2012 Estimated Annual Average Emissions. https://www.arb.ca.gov/ei/emissiondata.htm
20 Dedoussi, I. C., Eastham, S. D., Monier, E., & Barrett, S. R. (2020). Premature mortality related to United States cross-state air pollution.
Nature, 578(7794), 261-265.
9.B.b
Packet Pg. 267 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Introduction
Long-Range Community Electricity Scenarios 9
Nationwide, gas ignites over 4,000 home structure fires annually, causing on average 40 deaths and $54 million in property damage each year.21
▪ Energy Affordability: Gas infrastructure costs are expected to increase over the next several decades as more substantial infrastructure upgrades are required. The California Public Utility Commission generally allows each gas utility to increase gas rates based on the necessary expenditure to keep gas systems operational. Increased utility expenditures on the gas system are therefore expected to lead to escalating consumer costs that will likely impact low-income households significantly.22 Without any building electrification or renewable gas use, the cost of natural gas is expected to double from approximately $1.5 per therm to $3 per therm by 2050.23 These projected increases are already being seen in Northern California, with 2023 winter gas prices 32 percent higher than 2022.
24 Upgrading buildings to all-electric is also an
opportunity to complete other building upgrades such as air sealing and insulation, which can reduce energy costs and improve affordability.
▪ Resilience: When coupled with solar and battery energy storage, all-electric buildings can mitigate impacts of power outages. While a common misconception is that gas appliances provide a redundant system during power outages, gas appliances like water heaters, stoves, and space heaters typically cannot function without electricity to power the fans and controls needed for operation. Clean back-up power is therefore an important asset when the utility grid is down. Local solar paired with battery storage is also good for grid resilience in the region.
Electrification provides an opportunity for increased investment in the electrical grid and improved local resiliency in a safe and healthy way. For example, pairing HP HVAC units with good air filtration and home weatherization can protect residents from wildfire smoke during fires.
▪ High-road Local Jobs: New electrification policies and requirements support opportunities for new local jobs and existing local businesses in construction, building trades, and the “clean and green” economy, key components of Healdsburg’s economic development strategy.25 ▪ Greenhouse Gas Emissions Reduction: Gas usage in buildings accounted for 20 percent of Healdsburg’s GHG emissions in 2018.
26 The proportion of emissions coming from gas is
projected to increase as the emissions from electricity continue to reduce to meet state renewable and zero-carbon electricity targets.
27 This means that any appliance converted from
gas to electric will have reduced GHG operation in 2030. Reducing GHG emissions in Healdsburg 21 Ahrens, M. & Evarts, B. (2018). Natural Gas and Propane Fires, Explosions and Leaks Estimates and Incident Descriptions. National Fire Protection Association. https://www.nfpa.org/-/media/Files/News-and-Research/Fire-statistics-andreports/Hazardousmaterials/osNaturalGasPropaneFires 22 3 Energy and Environmental Economics, Inc. (2020). The Challenge of Retail Gas in California’s Low-Carbon Future. California Energy Commission. Available at: https://www.energy.ca.gov/sites/default/files/2021-06/CEC-500-2019-055-F.pdf 23 Gridworks. (2019). California’s Gas System in Transition: Equitable, Affordable, Decarbonized and Smaller. Available at:
https://gridworks.org/wp-content/uploads/2019/09/CA_Gas_System_in_Transition.pdf 24 Manna, Orka. (2023). NorCal PG&E customers are paying more for ga. Here’s why and what’s being done. Available at:
https://www.kcra.com/article/california-pge-higher-gas-prices-heres-why/42715426 25 City of Healdsburg. (2019). 2020-2025 Strategic Plan. Available at: https://ci.healdsburg.ca.us/DocumentCenter/View/11367/2020- 2025-Strategic-Plan-Initiatives-andGoals#:~:text=Strengthen%20Healdsburg%E2%80%99s%20economy%20and%20tax%20base%20through%20economic,enhancing%20cus tomer%20service%20and%20maintaining%20a%20business-friendly%20reputation. 26 City of Healdsburg. Climate Mobilization Study (2023). Available at:
https://www.ci.healdsburg.ca.us/DocumentCenter/View/17326/Adopted-Healdsburg-CMS-Compiled 27 City of Healdsburg. Climate Mobilization Study (2023).
9.B.b
Packet Pg. 268 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
10 will contribute to Healdsburg’s CMS goals to reduce per capita emissions by at least 40 percent below 1990 levels by 2030.28
Climate Mobilization Strategy Goals
In October of 2023, the Healdsburg CMS was adopted. This details the Measures and Actions Healdsburg will take in the coming years to reduce community-wide emissions by at least 40 percent in alignment with the states 2030 goal and to work towards carbon neutrality by 2045.
According to the results of the 2018 GHG inventory, the largest source of GHG emissions in Healdsburg was from on-road transportation, which accounted for 55 percent of total emissions.
The second largest source of GHG emissions was from natural gas usage in residential and nonresidential buildings, combined to account for 20 percent of total emissions. Natural gas is used to heat water, homes, and businesses and to power gas-powered appliances. Electricity usage accounted for the third largest source of emissions, with residential and non-residential usage combining for a total of 14 percent of total emissions in Healdsburg. As such, the Measures focus heavily on decarbonizing the transportation and building sector through electrifying the building stock and vehicles in conjunction with increasing procurement of renewable and carbon-free electricity sources for the community. For Healdsburg Electric to acquire the necessary amount of renewable and carbon-free electricity and plan for the increased electricity consumption through natural community growth and increasing electrification, it must first understand the anticipated future electricity consumption and peak electrical demand in the community under various electrification scenarios. The following specific CMS Measures were considered while developing the energy and demand scenario forecasting model discussed in this report:
▪ Measure BE-2: Continue to adopt an Electrification Reach Code for all new residential and commercial buildings with each triannual code cycle. Consider updating electrification ordinance to eliminate natural gas consumption in new construction for the 2025 California Building Standards Code and moving forward.29
▪ Measure BE-3: Decarbonize residential building stock by 8% by 2030. ▪ Measure BE-4: Decarbonize non-residential building stock by 5% by 2030. ▪ Measure T-4: Increase passenger zero-emission vehicle use and adoption to 30% by 2030. ▪ Measure T-5: Increase commercial zero-emission vehicle use and adoption to 40% by 2030.
The following section details how varying levels of CMS implementation were modeled to determine electricity consumption and peak demand in 2025, 2030, 2035, 2040, and 2045. 28 City of Healdsburg. Climate Mobilization Study (2023). 29 This measure is currently paused and will be reviewed during the 2025 California Building Code adoption cycle. Additionally, the 2025 Building Code includes an “electric preferred” structure that will promote use of heat pumps over gas appliances and further supports building electrification in the city.
9.B.b
Packet Pg. 269 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 11
3 Model Development
3.1 Intent
The intent of this project was to develop a dynamic long-range energy and demand model (Model) for the Healdsburg community that Healdsburg Electric can use to estimate electricity consumption and peak demand through 2045 under various electrification scenarios. These insights will help support decision-making on electricity procurement and infrastructure investments to meet future electricity consumption and peak demands.
3.2 Approach
The energy and demand model developed for Healdsburg Electric uses various data sources to model city-wide baseline electricity consumption and forecast future electricity consumption and peak demand on an hourly basis across a calendar year. The following sections detail the data sources utilized and provide an overview of the methodology employed. The following summarizes the process:
1. Baseline Energy Consumption Model: Established an average hourly city-wide electricity curve for Healdsburg, disaggregated by sector (residential, commercial), building type, and select end-use appliances.
2. Model Features: Includes toggles for inputting new commercial and residential buildings by building type, adding solar PV arrays, EV charging needs, EV charging behavior, and natural gas appliances converted to electric appliances for each building type.
3. Scenario Development: Different future energy and demand scenarios were created by inputting specific parameter changes (i.e., number of new homes, installed solar arrays, appliance conversions), which result in changes to hourly electricity consumption compared to the base model scenario.
4. Results: Generated on an hourly, monthly and annual basis, showing electricity consumption and peak demand.
This approach allows for dynamic modeling of future electricity needs. As the City gains new information (such as EV or heat pump adoption rates) the model can be easily used to analyze the impacts of electrification of buildings and vehicles on electricity consumption and peak demand over time.
This report provides results for the following energy and demand impacts:
• Electricity consumption: electricity consumed for buildings and transportation over a period of time (e.g., annually, monthly, or hourly), before on-site solar generation impacts • Net electricity consumption: electricity consumption including on-site solar generation impacts
9.B.b
Packet Pg. 270 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
12 • Peak demand30: maximum electricity demand for the time period being analyzed • Net peak demand: peak demand including on-site solar generation impacts Data Sources
The following section provides details on the data sources utilized to develop the Model. Table 1 summarize the data source, developing agency, and publication information.
Table 1 Data Sources Used
Use Data Name and Developing Agencies Publication
Frequency
Latest
Publication Year
Residential Appliance
Upgrade Model
U.S. Residential Building Stock (ResStock)
1 is developed
by U.S. Department of Energy (DOE) and the National
Renewable Energy Laboratory (NREL)
1-2 years 2024
Commercial Base
Model & Appliance
Upgrade Model
U.S. Commercial Building Stock (ComStock)
2 is
developed by the DOE and NREL
1-2 years 2024
Residential Base
Model
City of Healdsburg hourly energy meter data N/A3 2023
Solar Panel Energy
Capture
The PVWatts® Calculator uses solar data from the
National Solar Radiation Database (NSRDB), which is
maintained by the NREL
N/A4 2020
Forecasted Electric
Vehicle Energy Use
Department of Motor Vehicles Open Data Portal (DMV
Open Data Portal)
Annually5 2024
Electric Vehicle
Energy Use
The Electric Vehicle Infrastructure Projection Tool Lite (EVI-Pro Lite)6 was developed by the NREL in
collaboration with the California Energy Commission
(CEC), with support from the DOE’s Vehicle
Technologies Office.
N/A7 N/A7
1 U.S. Residential Building Stock Website: ResStock - NREL 2 U.S. Commercial Building Stock Website: ComStock - NREL 3 Private dataset provided by the City of Healdsburg
4 PVWatts Calculator Tool: PVWatts Calculator
5 California Department of Motor Vehicles Open Data Portal: Vehicle Fuel Type Count by Zip Code - Dataset - California Open Data 6 EV-Pro Lite Tool: Alternative Fuels Data Center: Electric Vehicle Infrastructure Toolbox (EVI-X Toolbox) 7 A published tool with multiple data sources and no projected plan for updates ResStock
U.S. Residential Building Stock End-Use Load Profiles form the basis of the electrification building models and were downloaded from the ResStock website from Release 1 and Scenario 2022 AMY2018. ResStock utilizes a variety of real-world data sources to model the U.S. residential building stock with high granularity. Key datasets include the Residential Energy Consumption Survey (RECS), which provides 15-minute interval data on energy usage and housing characteristics, and regional and local datasets on building types, climate zones, and energy systems. The tool 30 The model is based on hourly electricity consumption. However, peak demand is typically measured for 5- or 15-minute intervals.
Although the term peak demand is used throughout this report, it is referring to the maximum hour electricity consumption as shown in the model. Actual peak demand is estimated to be approximately 5% higher than the maximum hour electricity consumption.
9.B.b
Packet Pg. 271 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 13
integrates numerous unique combinations of housing characteristics, including data on building size, construction year, insulation levels, heating and cooling systems, and appliance usage. These datasets are combined to simulate energy performance under various scenarios, enabling a highly detailed representation of the residential building stock. ResStock was developed by the NREL and uses advanced statistical sampling and modeling techniques to ensure accuracy and comprehensiveness.
ComStock
U.S. Commercial Building Stock End-Use Load Profiles form the basis of the existing building model and were downloaded from the ComStock website from Release 1 and Scenario 2022 AMY2018.
ComStock utilizes an extensive range of data sources to create a model of the U.S. commercial building stock. Core datasets include the Commercial Buildings Energy Consumption Survey (CBECS), which offers 15-minute interval data on energy consumption patterns and building characteristics, alongside regional and localized datasets that account for climate zones, building types, and energy systems. The tool synthesizes data on factors such as building size, construction year, occupancy type, equipment efficiency, and operational schedules to generate millions of unique combinations representing the commercial sector. These inputs are used to simulate energy performance across various scenarios, providing a comprehensive and scalable view of commercial building energy use.
Developed by the NREL, ComStock applies sophisticated statistical sampling and modeling methods to support accurate and actionable energy analysis.
City of Healdsburg Meter Data
Rincon was provided with electricity meter data by Healdsburg Electric for 2023, cataloging the actual residential electricity use for the city for an entire year. The data was provided at an hourly interval for a sampling of meters within the entire city. Monthly total electricity sales by category were also provided.
PVWatts Solar Energy Calculator
The PVWatts® Calculator relies on data from the National Solar Radiation Database (NSRDB) to estimate the electricity generated by solar photovoltaic (PV) systems. The NSRDB includes detailed information about solar radiation, such as how much sunlight is available at specific locations, as well as weather data like temperature and wind speed. PVWatts combines this information with user inputs, such as system size, tilt angle, and location, to calculate how much electricity a solar system can produce in a year. The downloaded dataset models the energy captured by a 1 kilowatt (KW) solar array for this study.
DMV Open Data Portal
The California Department of Motor Vehicles (DMV) reports on an annual basis the registered vehicle counts broken down by zip code, model year, fuel type, make, and duty (light/heavy).
EVI-Pro Lite Load Profile Tool
The EVI-Pro Lite Tool uses real-world travel data to estimate the charging infrastructure needed to support EVs in the United States. Key data sources include the National Household Travel Survey (NHTS), which provides detailed information about how people travel, including trip lengths and times, and data on EV charging behavior and vehicle characteristics. The tool integrates these datasets with user-defined inputs, such as the number of EVs and charging preferences, to project
9.B.b
Packet Pg. 272 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
14 the number and type of charging stations required. Developed by the NREL in collaboration with the California Energy Commission (CEC), EVI-Pro Lite helps planners, utilities, and policymakers assess EV infrastructure needs under various scenarios.
3.3 Methodology
Scenario Development
While any scenario can be modeled with the developed model, Healdsburg initially developed five specific scenarios to demonstrate the potential peak demand and annual electricity consumption in 2025, 2030, 2035, 2040, and 2045. These different scenarios reflect the anticipated electricity consumption and peak demand under various levels of CMS implementation. The scenarios are defined as follows:
▪ Business-as-Usual (BAU)31: The number of appliance replacements by building type by year is based on current market trends continuing through 2045. New homes are assumed to be mixed fuel based on the current average building through 2045. ▪ Underachieve CMS: The goals of the CMS for building and vehicle electrification are under achieved. 80% of new homes are assumed to be all electric by 2045. ▪ Achieve CMS: The goals of the CMS for building and vehicle electrification are achieved. 95% of new homes are assumed to be all electric by 2045.
▪ Overachieve CMS: The 2030 goals of the CMS for building and vehicle electrification are exceeded, where 100% electrification of the building and transportation sector is achieved by 2045.
▪ Most Likely: Based on input from Healdsburg residents obtained through a community survey32 on expected electrification adoption, as well as current trends within the city, this scenario was developed to represent the most likely scenario to occur. Under this scenario it is anticipated that residential building electrification goals of the CMS will be exceeded, non-residential building electrification goals will be achieved for 2030 and exceeded by 2045, and electrification of the transportation sector will be slightly underachieved. 90% of new homes are assumed to be all electric by 2045.
Table 2 summarizes the building and transportation electrification conditions assumed for each scenario (Underachieve, Achieve, Overachieve, and Most Likely) for both the 2030 and 2045 target years. New building electrification estimates are based on both the percentage of new buildings which are all electric (Table 2) as well as the number of new buildings expected to be constructed.
Table 3 shows the total number of buildings expected to be in operation for each milestone year through 2045. New construction was calculated by subtracting the baseline building stock (2023) from the forecasted building stock. Input values for existing residential building electrification are based on current equipment numbers in Healdsburg determined using ResStock data sets (Table 4) and the percent electrification assumed in each scenario for 2030 and 2045. Values between the baseline (2023) and 2030 and between 2030 and 2045 were interpolated. 31 It was determined that the BAU scenario was not representative of conditions in Healdsburg, as electrification and EV trends in Healdsburg have already outpaced the market trends observed in the 2023 baseline year. Therefore, for the purpose of this report the BAU model results are not presented or further discussed. 32 View Appendix C for detailed results from the Community Electrification Survey.
9.B.b
Packet Pg. 273 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 15
Input values for existing non-residential building electrification are based on current equipment numbers in Healdsburg determined using Comstock data sets (Table 5) and the percent electrification assumed in each scenario for 2030. In all scenarios except for the Overachieve and Most Likely scenario, equipment replacement in non-residential buildings post 2030 is assumed to continue to follow the annual replacement trend determined for the preceding 2030 years. The compound annual growth rate for equipment replacement in non-residential buildings between the baseline (2023) and 2030 was utilized to determine equipment replacement post-2030 through 2045 in all scenarios except for the Overachieve and Most Likely scenario where 100% and 45% electrification was assumed, respectively.
Input values for light-duty and heavy-duty EV penetration were determined based on the forecasted vehicle population for Healdsburg developed as part of the Healdsburg CMS and based on Department of Motor Vehicle registration data for the city. Data was further disaggregated by lightduty and heavy-duty vehicle types and the percent EV penetration for each vehicle type assigned for each scenario in 2030 and 2045. Values between the baseline (2023) and 2030 and between 2030 and 2045 were interpolated.
As mentioned above, for the Overachieve scenario, it is assumed the new buildings, existing buildings and vehicles are fully electrified by 2045. This provides an upper limit for possible electricity consumption and peak demands. See Appendix A for the complete set of model inputs by variable for each modeled year (e.g., 2025, 2030, 2035, 2040, 2045).
Table 2 Scenario Conditions in 2030 and 2045
Scenario/Target Year
Condition1
New Building
Electrification
Existing
Residential
Building
Equipment
Electrification
Existing Nonresidential
Building
Equipment
Electrification
Passenger EV
Penetration
Commercial EV
Penetration
Underachieve
2030 Conditions 80% 5% 2% 10% 10%
2045 Conditions1 80% 15% 11% 57% 50%
Achieve
2030 Conditions 95% 8% 5% 30% 40%
2045 Conditions1 95% 25% 21% 90% 90%
Overachieve
2030 Conditions 100% 20% 15% 45% 50%
2045 Conditions1 100% 100% 100% 100% 100%
Most Likely
2030 Conditions 90% 10% 5% 35% 10%
2045 Conditions1 90% 60% 45% 75% 60%
1 The CMS established 2030 goals, but did not include 2045 goals. As such, the conditions post 2030 presented herein are used for scenario forecasting purposes and do not represent CMS goals.
Model Parameters
A base model was developed for each building type to get a baseline projection of what the current electricity consumption would be without any appliance upgrade, solar, or EV implementation.
9.B.b
Packet Pg. 274 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
16 ComStock™ and Healdsburg Electric meter data were utilized to determine the electricity consumption by building type in the Healdsburg climate zone.
Building Types
Sonoma County Assessor data for Healdsburg and Healdsburg Electric account data was utilized to determine the number of existing buildings in Healdsburg in the Residential and Commercial sector in 2023. Analysis of assessor data in conjunction with ResStock and ComStock subsector definitions was utilized to establish a comprehensive list of building types that make up Healdsburg’s building stock in the baseline energy demand curve. These include:
▪ Residential
o Single-family
o Multi-family
▪ Commercial
o Office
o Retail
o Warehouse
o Restaurant
o Small Hotel
o Other
New building construction projections were developed for each building type through 2045.
Standard residential building growth was determined by applying an annual compound growth rate of 0.17%, obtained from the Sonoma County Regional Climate Protection Authority (RCPA) Climate Action Plan to the existing residential building stock. This projection is also used in Healdsburg’s CMS GHG forecasting. In addition to the standard growth rate in the residential sector, Healdsburg is on track to meet Regional Housing Needs Allocation (RHNA) requirements for the 2023-2031 cycle. To account for the additional residential building stock growth due to building development in response to RHNA, the number of additional RHNA homes to be built through 2045 were calculated by applying the compound annual growth rate of RHNA homes from the 2023-2031 cycle to future years. The number of anticipated additional RHNA households were added to the standard projected households to determine the total number of new households anticipated to be added through 2045.
Based on information from Healdsburg, the scenarios assume that all RHNA households added to the city’s building stock from the 2023-2031 cycle will be multi-family homes. Analysis of the last 10 years of County assessor data indicated that on average 11.7 single-family homes are built per year.
Therefore, for the purposes of this project, post the current RHNA cycle, ending in 2031, it was assumed that total single-family homes added to the city’s building stock would be 11.7 per year. All RHNA households and excess new growth beyond the estimated single-family homes were attributed to multi-family units.
County assessor data was utilized to determine the annual compound growth rate of commercial buildings by subcategory that occurred over the last decade. For the purposes of this project, it was assumed that commercial building growth would continue as it has in the past and the same annual compound growth rate was applied to the existing commercial building stock to project future commercial building stock numbers through 2045. Table 3 provides a summary of existing building
9.B.b
Packet Pg. 275 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 17
stock and projections through 2045 that were utilized as base data for the Model and for modeling new buildings.
Table 3 Building Type and Stock for Current and Projected Scenarios Building Stock Current
(2023) 2025 2030 2035 2040 2045
Residential
Single-Family 4,033 4,050 4,092 4,173 4,232 4,290
Multi-Family 885 1,021 1,361 1,984 2,154 3,173
Commercial
Office 125 126 127 129 130 132
Retail 58 59 60 62 63 65
Warehouse 61 62 65 67 70 73
Restaurant 18 18 19 19 20 20
Hotel 25 26 28 30 32 35
Other 165 168 175 181 188 195
Residential Electricity Consumption and Peak Demand
City of Healdsburg Meter Data (meter data) was provided by Healdsburg Electric from the year 2023 to develop a baseline example of city-wide single and multi-family residential electricity consumption and peak demand. The data provided was consolidated into hourly intervals spanning an entire year. This data was consolidated to represent a single home, then multiplied by the number of houses described in Table 3; EV inputs were excluded from this dataset. Existing solar generation for residential customers acquired from Healdsburg Electric are accounted for in the base model and all future scenarios for the residential sector though it is not disaggregated by building type.
Commercial Electricity Consumption and Peak Demand
ComStock data was used to develop the base model for city-wide commercial buildings including small hotels, small office buildings, full-service restaurants, stand-alone retail buildings, warehouses, and other buildings. All the buildings in this list were captured within the downloaded ComStock data with the exception of other buildings, which were calculated using the average of the buildings excluding restaurants. Each of these building base models from ComStock were aggregated to the hour over an entire year and do not include solar or EV charging. The kilowatt-hour (KWH) for each building was divided by the modeled square feet provided by ComStock, to determine the electricity consumption per square foot, and then multiplied by the estimated square feet of all buildings within this category currently existing within the city (Table 3).
𝐶𝑜𝑚𝑚𝑒𝑟𝑐𝑖𝑎𝑙 𝐾𝑊𝐻 =
𝐶𝑜𝑚𝑠𝑡𝑜𝑐𝑘 (𝐾𝑊𝐻)
𝑀𝑜𝑑𝑒𝑙𝑒𝑑 𝐴𝑟𝑒𝑎 (𝑠𝑞𝑓𝑡)
⋅ 𝐶𝑜𝑚𝑚𝑒𝑟𝑐𝑖𝑎𝑙 𝐴𝑟𝑒𝑎 (𝑠𝑞𝑓𝑡)
Existing solar generation for commercial customers acquired from Healdsburg Electric were added to the ComStock base models and therefore included in all future modeled scenarios as well.
Provided data was not able to be disaggregated by building type, therefore existing solar for commercial buildings is incorporated at the sector level.
9.B.b
Packet Pg. 276 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
18 ComStock and ResStock Building End Use and Savings Models ComStock and ResStock provide multiple data outputs that can be used to better understand a particular region’s building stock and the impacts of energy efficiency and electrification strategies on overall energy and demand. Two major datasets were leveraged for Healdsburg’s electrification demand analysis. The first is the building stock analysis which utilizes each model’s annual metadata which includes information on what energy consuming equipment is found in each individual building model. This information includes both the equipment type and energy use (i.e., electricity, natural gas, etc.) for space heating and cooling, water heating, clothes washing and drying, and cooking appliances as well as pool heaters, spas, lighting and other end uses that were identified through the NREL survey process. End uses for Sonoma County are summarized in the Building End Use section below. This data provided the percentage of appliances which could be electrified within Healdsburg.
The modeled savings curves for climate zone 3C were also utilized for scenario forecasting models.
These curves show the average energy use and savings compared to the baseline for an array of efficiency and electrification projects. The results are calculated by summing up the energy use from across thousands of modeled buildings within the 3C climate zone. For residential buildings, the total savings was divided by the number of residential buildings modeled to get an average single building saving curve for new residential buildings and energy use or savings curves for each appliance type. For commercial buildings, the total savings was divided by the number of square feet modeled for each commercial building type to get an average savings curve per square foot by building type and appliance. This means that within this average building there are fractions of many uses that not all buildings have (including spas, pool heating, and cooling). Therefore, the electricity/energy use of one average building is not reflective of having a particular technology, but when all buildings are summed, the outcome does reflect the estimated rate of adoption of these end uses within the city.
Building End-Use
An appliance fuel sources analysis was completed for Healdsburg residential and commercial building stock using data obtained from ResStock and ComStock. Because the sample size for just Healdsburg in ResStock and Comstock was small, the data sets for the entirety of Sonoma County were utilized to be representative of Healdsburg. ResStock and Comstock data sets were utilized to determine the prevalence of different appliance technology by fuel type (e.g., electric, natural gas, other fuel) and to estimate total electricity consumption by electric end-use appliances for each previously defined building type. The prevalence of different appliance technologies was used to determine the primary end-uses in Healdsburg to be included in the Model as well as for forecasting the number of non-electric appliances that could be transitioned from gas to electric power.
Electricity use consumption by appliance type was utilized in the Model when forecasting additional electricity load that would be expected by transitioning from a natural gas to an electric appliance.
Table 4 summarizes the number of gas-fueled appliances available for transition to electric in the baseline year and the anticipated added electricity load per appliance in residential buildings based off the ResStock dataset. Total electricity consumption is the sum of all hourly values over an entire year for a single appliance, and the maximum is for a single hour within the year.33 33 The single-hour maximum for an appliance is based on the highest consumption for one hour for the appliance over the course of the year. Depending on the appliance, this may occur at any point throughout the year. As this is the maximum demand over an aggregated hour, the peak (kW) for a given moment may be higher.
9.B.b
Packet Pg. 277 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 19
Table 4 Appliances Available for Electric Transition and Potential Added Electricity Consumption by Converted Appliances in Residential Buildings Appliance Water Heater1 HVAC2,3 Stove4 Dryer5
Standard High-Efficiency
Single Family
# of Gas
Appliances 3,407 3,070 2,441 1,873
Total Annual
Electricity
Consumption
(kwh)
799 2,741 875 285 216
Max Hourly
Electricity
Consumption
(kwh)
0.17 2.35 1.02 0.10 0.06
Multi-Family
# of Gas
Appliances 589 455 330 92
Total Annual
Electricity
Consumption
(kwh)
498 1,139 396 246 96
Max Hourly
Electricity
Consumption
(kwh)
0.10 0.95 0.63 0.09 0.05
1 Electricity consumption based on conversion of non-electric water heating to a heat pump water heater. 2Electricity consumption for standard HVAC is based on conversion of non-electric heating to a minimum-efficiency heat pump (SEER 15, 9 HSPF) and for a high efficiency HVAC is based on conversion of all non-electric or less-efficiency electrical heating to a highefficiency heat pump (SEER 24, 13 HSPF). 3 Electricity consumption based on conversion to a heat pump HVAC accounts for the change in electricity demand associated with heating and cooling. Based on ResStock end-use analysis, approximately 25% of single-family homes and 35% of multi-family homes have no central AC or room AC so are assumed to currently not use electricity for cooling. For homes without cooling appliances, the conversion to a heat pump HVAC would result in increased heating and cooling electricity demand. See Appendix B for details on enduse of appliances modeled by ResStock for Healdsburg region. 4 Electricity consumption based on conversion of non-electric ranges to electric ranges. 5Electricity consumption based on conversion of non-electric dryers to electric resistance dryers.
Table 5 summarizes the number of appliances available for conversion to electric or more electrically efficient appliances in the baseline year and the anticipated added electricity load per appliance in non-residential buildings based on the ComStock dataset. ComStock savings curves utilized to determine the electricity usage and demand for conversion of commercial roof top units (RTUs) to heat pump RTUs assumes replacement of natural gas and electric resistance RTUs, meaning that there is both an electricity increase for replacement of natural gas RTUs and an electricity savings for replacement of electric resistance RTUs with more efficient heat pump RTUs.
ComStock assumes there are approximately 192 gas RTUs and 52 electric resistance RTUs in Healdsburg. The electricity usage and demand included herein for boiler replacement assumes the replacement of natural gas boilers with an air-source heat pump for space heating. The replacement of natural gas commercial cooking equipment with electric equipment is assumed for buildings with kitchen spaces. ComStock did not have electricity savings curves for replacement of commerical hot water heaters, therefore, no electricity demand curves for commercial hot water heater conversions
9.B.b
Packet Pg. 278 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
20 are included in the Model. For new commercial buildings added to Healdsburg's building stock it was assumed that HVAC systems would be 100% electric while commercial kitchens would follow existing trends, e.g., of being mixed fuel appliances and therefore it was assumed only 50% of kitchens would be all-electric. This aligns with the upcoming Title 24 2025 code which has expanded heat pump HVAC requirements to additional buiding types such as offices.34 Total electricity consumption is the sum of all hourly values over an entire year for a single appliance, and the maximum electricity consumption is for a single hour within the year. 35 Negative values represent electricity loads that save electricity and a reduction in electrical use.
Table 5 Appliances Available for Conversion and Electricity Consumption by Appliance in Non-Residential Buildings
Appliance RTUs1 Boiler2 Kitchen Equipment
Small Office
# of Appliances 61 8 N/A
Total Annual Electricity
Consumption (kwh)
-11,492 652 N/A
Max Hourly Electricity Consumption
(kwh) -0.41 0.49 N/A
Retail
# of Appliances 19 27 N/A
Total Annual Electricity
Consumption (kwh) -14,727 21,874 N/A
Max Hourly Electricity Consumption
(kwh) 4.32 11.79 N/A
Warehouse
# of Appliances 35 6 N/A
Total Annual Electricity
Consumption (kwh) -40,734 448 N/A
Max Hourly Electricity Consumption
(kwh) -1.03 0.87 N/A
Restaurant
# of Appliances 15 1 11
Total Annual Electricity
Consumption (kwh) -9,820 113 71,874
Max Hourly Electricity Consumption
(kwh) 0.11 0.07 14.70
Small Hotel
# of Appliances - 8 N/A
Total Annual Electricity
Consumption (kwh) N/A 1,932 N/A
34 https://energycodeace.com/download/256482/file_path/fieldList/ECA+NR+Whats+Changed+Fact+Sheet+WEB.pdf 35 The single-hour maximum for an appliance is based on the highest consumption for one hour for the appliance over the course of the year. Depending on the appliance, this may occur at any point throughout the year. As this is the maximum demand over an aggregated hour, the peak (kW) for a given moment may be higher.
9.B.b
Packet Pg. 279 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 21
Max Hourly Electricity Consumption
(kwh) N/A 2.06 N/A
Other
# of Appliances 101 29 N/A
Total Annual Electricity
Consumption (kwh) -15,177 4,449 N/A
Max Hourly Electricity Consumption
(kwh) -0.10 2.62 N/A
Notes: N/A = not applicable appliance for building type; - = indicates no units for conversion 1 Electricity consumption based on conversion of both natural gas RTUs and electric resistance RTUs to heat pump RTUs. ComStock data had no data for hotels conversions of RTUs because HVAC systems in hotels tended to be other equipment types than RTUs. 2Electricity consumption is based on conversion of natural gas boilers to an air-source heat pump for space heating. 3Electricity consumption is based on conversion of natural gas kitchen equipment to electric kitchen equipment (e.g., broilers, fryers, griddles, ovens, ranges, and steamers) in applicable buildings. Of the modeled building types presented herein only restaurants are considered to have kitchen type spaces.
Electrification Savings Curves by Appliance
END USE SAVINGS SHAPES
Several appliance types were identified as likely upgrades from natural gas to electric for Healdsburg in coming years and were chosen as closest predictors for electrical demand by building type. End Use Savings Shapes (EUSS) were used to model each appliance electrical demand, by building type.
The EUSS data sets present the overall energy savings associated with various upgrades as well as disaggregates the energy demand by fuel source including natural gas, electricity, and other fuels. In most cases the conversion of appliances from natural gas to electricity results in net energy savings but an increase in electricity consumption.
ComStock and ResStock provide EUSS for a variety of energy efficiency and electrification actions including replacing gas water heaters with HPWH and replacing gas furnaces with HP HVAC units.
Each of these datasets (22 in total) were aggregated to the hour mark and represent a single appliance so they could be easily scaled up when modeling future scenarios. ResStock 2022.1 series savings curves from Upgrade 7 were used to model the electricity impact associated with switching from a natural gas appliance to an electric alternative. Because the ResStock Upgrade 7 is for whole home electrification, each appliance modeled was disaggregated from the data set to model electricity impact associated with dryer, kitchen range, hot water heater and HVAC conversion from natural gas to electric. ComStock 2024.1 series savings curves from Upgrades 8 and 22 were utilized to model the electricity impact associated with boiler and kitchen equipment conversion from natural gas to electric. ComStock does not have a model for electricity impact associated with just fuel conversion measures of RTU and HVAC equipment to heat pumps. Therefore, ComStock 2024.1 series savings curves from Upgrade 1 was used to model the electricity impact associated with replacement of both gas-fired and electric resistance RTUs with a high-efficiency heat pump RTU.
ComStock does not have a model for the electricity impact associated with fuel conversion of hot water heaters and therefore, the Model does not include electricity usage and demand impacts for hot water heater conversion in commercial buildings. The datasets by Upgrade are defined as follows:
Residential
- Upgrade 7 – Whole home electrification std. efficiency (used to pull individual appliance curves)
9.B.b
Packet Pg. 280 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
22 - Upgrade 11 – Whole home electrification and envelope upgrade (used for new whole home electrification curves)
Commercial
- Upgrade 1 – Heat Pump Rooftop Package Unit (HVAC)
- Upgrade 8 – Heat Pump Boiler (for space heating)
- Upgrade 22 – Electric Kitchen
NEW BUILDING ESTIMATES
New residential buildings were also modeled using EUSS from ResStock using the whole home electrification and envelope upgrade scenario (Upgrade 11 from the 2024.2 series)36 and represent one new single-family or multi-family dwelling. Solar PV adoption (required by CA building code) was incorporated into the new single-family homes by adding a 3.5 kW array for each single-family home added. A 3.5 KW array equates to an annual energy offset of roughly 6,000 kWh. ComStock does not have a whole building electrification scenario for new commercial buildings due to the variation in the appliances and conditions that are relevant for each commercial building type.
Further, current building codes do not target commercial buildings for whole building electrification.
Therefore, new commercial buildings were modeled assuming the same energy profile as existing commercial buildings. This is conservative as new commercial buildings experience increased efficiency and some electrification compared with existing buildings. To account for the likely level of electrification that new commercial buildings would undergo and increasing heat pump or electric-ready requirements in CA building code, it was assumed that 100% of new commercial buildings would install an electric heat pump RTU and 50% would install electric kitchen equipment.
This was accounted for in modeled scenarios by adding 100% of the new building RTUs and 50% of the new building kitchen equipment to the number of existing building equipment numbers input into the Model for conversion.
Solar Arrays
The number of residential and commercial solar arrays to be added to the grid were forecasted based on historic Healdsburg data. Healdsburg Electric provided solar array data including number of arrays and array capacity added to the grid since 2002. Based on this data, on average, approximately 24 residential solar arrays37 with an average nameplate capacity of 6 kW and approximately 2 commercial solar arrays with an average nameplate capacity of 84 kW have been added to the grid each year in the past decade. Solar arrays added to multi-family buildings are included in the commercial solar array values. It was assumed that this trend would continue in Healdsburg through 2045. While storage batteries also exist in the city, battery storage impacts were excluded from modeling at this time due to the understanding that most batteries are currently used as backup resources and are not actively managed for reducing peak loads. Table 6 summarizes the total number of solar arrays and additional capacity that is assumed to exist in the modeled year. All scenarios were run assuming the same trend of solar array addition over time. 36 https://www.nrel.gov/docs/fy24osti/89600.pdf
37 Residential averages exclude new construction, as the model already accounts for included solar in new single-family construction.
9.B.b
Packet Pg. 281 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 23
Table 6 Additional Solar Included Each Model Year
Category 2025 2030 2035 2040 2045
Residential
Number of Cumulative Arrays 24 145 266 387 508
Total Capacity (kW) 151 906 1,661 2,416 3,171
Commercial
Number of Cumulative Arrays 2 12 22 32 42
Total Capacity (kW) 167 1,004 1,841 2,677 3,514
Electric Vehicle Charging
The current vehicle counts by fuel type registered to the 95448 zip code for Healdsburg was obtained from the DMV Open Data Portal. In 2024 there were 20,357 registered vehicles in Healdsburg of which 18,510 were light-duty vehicles and 1,847 were heavy-duty vehicles. Of the registered vehicles, 924 of the light-duty vehicles were designated as plug-in EVs while 4 heavy-duty vehicles were designated as plug-in EVs. This data was utilized as the baseline to forecast both the future vehicle numbers in Healdsburg in alignment with anticipated growth as well as forecast the number of plug-in EVs based on the defined scenario goals. Table 7 summarizes the number of EVs anticipated to be added to Healdsburg by year by scenario.
Table 7 Number of EVs in Need of Charging by Scenario and Year Scenario 2025 2030 2035 2040 2045
Underachieve
Light-duty EVs 1,164 2,117 3,814 6,873 12,356
Heavy-duty EVs 38 216 502 793 1,088
Total EVs 1,202 2,333 4,316 7,666 13,445
Achieve
Light-duty EVs 1,830 6,353 10,704 15,145 19,635
Heavy-duty EVs 137 850 1,214 1,585 1,959
Total EVs 1,968 7,204 11,917 16,729 21,594
Overachieve
Light-duty EVs 2,330 9,531 13,558 17,669 21,817
Heavy-duty EVs 171 1,061 1,427 1,801 2,177
Total EVs 2,500 10,592 14,986 19,470 23,994
Most Likely
Light-duty EVs 1,997 7,413 10,347 13,342 16,362
Heavy-duty EVs 38 216 573 937 1,306
Total EVs 2,034 7,629 10,920 14,279 17,669
9.B.b
Packet Pg. 282 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
24 Electric vehicle charging data was obtained using Electric Vehicle Infrastructure Projection Tool Lite (EVI-Pro Lite). The EVI-Pro Lite tool includes default Worst Case, Best Case, and Base Case scenarios to evalute how different charging behavior impacts electricity demand. For informational purposes the default Worst Case, Best Case, and Base Case scenarios are defined below. These cases were evalauted but it was determined that different selections within the EVI-Pro Lite tool would be more representative of Healdsburg, such as vehicle miles traveled, home charging, and other inputs.
Therefore, a Healdsburg-specific EV charging case that best represented expected Healdsburg EV conditions was developed and incorporated into the Model. Because temperature effects EV charging battery range, winter and summer scenarios were modeled and compiled in the Model to better represent EV charging demand throughout the year. The Healdsburg-specific EV charging case is defined as follows, with details on the input parameters provided in the Table 8:
▪ Healdsburg-specific Case: Representative of expected Healdsburg charging behavior. ▪ Default Base Case: Representative of typical charging behavior for the region. ▪ Default Best Case: Representative of the best charging behavior where the demand curve is smoother through strategic charging times.
▪ Default Worst Case: Representative of the worst charging behavior where the peaks of the demand curve are exacerbated by charging occurring all at once.
Table 8 EV Parameter Inputs
Parameter Healdsburg-specific Best Scenario Base Scenario Worst Scenario Average daily miles
traveled per vehicle
25 miles1 25 miles 35 miles 45 miles
Average ambient
temperature
50°F (Winter)
68°F (Summer)
68°F 50°F 104°F
Plug-in vehicles that are
all-electric
50% 25% 50% 75%
Plug-in vehicles that are
sedans
50% 80% 80% 20%
Mix of workplace charging 20% Level 1 and
80% Level 2
80% Level 1 and
20% Level 2
20% Level 1 and
80% Level 2
80% Level 1 and
20% Level 2
Access to home charging 75% with 20% Level
1 and 80% Level 2
50% with 80% Level
1 and 20% Level 2
100% with 50%
Level 1 and 50%
Level 2
100% with 20%
Level 1 and 80%
Level 2
Preference for home
charging
80% 60% 100% 100%
Home charging strategy Delayed – finish by
departure2
Immediate – as
slow as possible
(even spread)
Immediate – as fast
as possible
Delayed – start at
midnight
Workplace charging
strategy
Immediate – as fast
as possible
Immediate – as
slow as possible
(even spread)
Immediate – as fast
as possible
Delayed – start at
midnight
1 Based on Healdsburg VMT data utilized for the CMS, vehicles on average travel 18 miles a day. The lowest daily travel option available in EVI-Pro Lite was for 25 miles.
2 While this behavior is not what is currently practiced by most Healdsburg residents, Healdsburg chose to model this scenario as the city will aim to implement a large education campaign, time of use strategy, and other programs to encourage EV charging behaviors that reduce peak demands.
9.B.b
Packet Pg. 283 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Model Development
Long-Range Community Electricity Scenarios 25
This dataset models demand (kW) for 15-minute intervals within a single day (weekday and weekend day) depending on the input parameters. Rincon averaged the 15-minute kW demand over an hour to convert to kWh. Then each day was replicated for weekday/weekend day over an entire year before being applied to the base model to calculate future modeled scenarios. EV charging electricity consumption is based on the size of the fleet added to the model. Vehicle numbers determined from the DMV Open Data Portal were used to model the EV fleet size. The number of EV vehicles added to the model can be done in increments of 500.
A check of the EVI-Lite tool was completed using vehicle miles traveled (VMT) data from Healdsburg CMS obtained from a travel demand model. Annual forecasted VMT was translated to electricity needs for charging based on vehicle energy efficiency (e.g., kwh per mile) values obtained from EMFAC2021 to backcheck electricity needs determined by EVI-Pro Lite modeled values. This backcheck was within 2% of EVI-Pro Lite cumulative results for the Healdsburg-specific case. The percent error between EVI-Pro Lite modeled values and the backcheck electricity needs was least when the CMS VMT values were nearest a multiple of 500 as the EVI vehicles were modeled in the tool in increments of 500. Additionally, the backcheck values were lower than EVI-Pro Lite modeled results. This is due to EVI-Pro Lite background data using a daily mileage that is greater than that anticipated in Healdsburg. Based on the VMT data available for Healdsburg, light-duty vehicles travel on average 19 miles per day while heavy-duty vehicles travel on average 7 miles per day.
Because the lowest daily mileage that can be modeled with EVI-Pro Lite is 25 miles per day, EVI-Pro Lite produced an overestimate of electricity needs for Healdsburg registered vehicles. However, because EV charging in Healdsburg is cheaper than surrounding areas, Healdsburg experiences an influx of drivers coming to the city to charge their vehicles. Therefore, while a higher mileage for EV charging is included in the Model, this is considered representative of the annual EV charging that Healdsburg is likely to experience, and may even be a low estimation if EV drivers are intentionally ‘filling up’ in Healdsburg.
9.B.b
Packet Pg. 284 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
26 4 Results
4.1 Current Energy and Demand
Annual Electricity Consumption
Figure 1 presents the current annual electricity consumption by month disaggregated by residential and commercial building stock. The baseline model estimated the current net electricity consumption in Healdsburg to be 73,592 MWh for 2023, with the greatest demand occurring in the summer months of July and August. This was compared to actual data in 2023 which totaled 74,985 MWh, a discrepancy of about 2%. The annual modeled net electricity consumption serves as both a baseline and a backcheck on the overall Model accuracy. Approximately 62% of net electricity consumption is from commercial buildings in Healdsburg while the remaining 38% is made up from residential net electricity consumption.
Figure 1 Annual Net Electricity Consumption (MWh) for the Current Base Model Scenario.
The above figure depicts the total expected net electricity consumption in megawatt hours (MWh) for each month under current conditions which encompasses all of the building base models. This graph does not take into consideration additional solar, new appliances, new construction, or additional electric vehicles. The exact value of each individual bar is described in the graph as white text.
9.B.b
Packet Pg. 285 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 27
Peak Demand
Figure 2 presents the current net peak demand by month. Net peak demand within this Model is measured in MWh on an hourly basis. The model net peak demand for electricity in Healdsburg in 2023 was 21.4472 MWh on August 6th at 6:00 PM. This is due in part to August 6th being one of the three hottest days in 2023. August is typically one of the hottest months in Healdsburg and the net peak demand is partly driven by the need for cooling and the time coinciding with when most residents are arriving home from work and solar has reduced production. Table 9 presents the month, day, time, and temperature of Healdsburg net peak demands over the last 6 years for reference.
Figure 2 Net Peak Demand (MWh) for the Current Base Model Scenario. The above figure depicts the hour each month with the modeled net peak demand in megawatt hours (MWh) for the maximum hour net electricty consumption under current conditions. This graph does not take into consideration any forecasted changes to solar, buildings, appliances or EVs which will be covered in the forecasted scenarios. The exact value of each individual bar is described in the graph as white text, and the day of the month and hour of each maximum use is displayed in the gray boxes above each bar.
9.B.b
Packet Pg. 286 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
28 Table 9 Healdsburg Historic Net Peak Demand
Date Time Peak Demand (MW)
Temperature (F)
September 25, 2019 17:00 23.00 103
September 7, 2020 17:00 23.19 111
June 17, 2021 18:00 20.48 102
September 6, 2022 15:00 24.63 114
August 6, 2023 19:00 19.24 100
July 2, 2024 19:00 23.63 105
4.2 Energy and Demand Scenarios
The following sections provide the results for all forecasted scenarios in terms of electricity consumption (i.e., no solar included) and net electricity consumption (i.e., with solar included) on an annual, monthly, and peak demand basis.38 Electricity consumption shows the total electricity needed to power homes, businesses, and vehicles in Healdsburg. As electricity consumption increases, the utility will need to deploy additional resources to meet this demand.
Annual Electricity Consumption
Figure 3 demonstrates the change in electricity consumption for buildings only (i.e., no EVs or solar) compared with the current building electricity consumption across all scenarios and milestone years. As shown, building electrification under all scenarios increases annual electricity consumption by 2030 by approximately 4,000 MWh. By 2045 building electrification increases annual electricity consumption beyond current consumption by approximately 12,500 to 15,500 MWh depending on the scenario.
Figure 4 presents the modeled annual electricity consumption for both buildings and EV charging across all scenarios and milestone years. As shown, modeled EV charging increases annual electricity consumption compared to current consumption by approximately 11,000 to 35,000 MWh by 2030 and approximately 53,000 to 87,000 MWh by 2045 depending on the scenario. Compared with Figure 3, this demonstrates that increased EV adoption and associated charging needs could increase annual electricity consumption an additional 7,500 to 31,500 MWh by 2030 and 40,000 to 72,000 MWh by 2045 compared with the impacts of building electrification alone. As such, between 68% to 89% of increased annual electricity consumption in 2030 and between 76% to 83% of increased annual electricity consumption in 2045 is attributable to EV charging needs versus building electrification. Table 10 shows that electricity consumption could increase to between 85,000 MWh to 109,000 MWh by 2030 and to between 126,000 to 161,000 MWh by 2045. This is
1.1 to 1.5 times the current consumption by 2030 and 1.7 to 2.2 times the current consumption by 2045.
38 Each of the forecasted scenarios were modeled under Healdsburg-specific EV charging conditions and assuming electrification of HVACs with standard heat pump HVAC systems. Modeling standard HVAC systems provides a more conservative estimate for forecasting electricity demand compared to modeling higher efficiency heat pumps.
9.B.b
Packet Pg. 287 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 29
Figure 5 presents the modeled annual net electricity consumption across all scenarios and milestone years, accounting for increased electricity consumption from building electrification and EV charging as well as the offsetting impacts of increased on-site solar generation. Compared with Figure 4, this demonstrates that the modeled increased solar generation can offset electricity consumption from building electrification and EV charging by approximately 3,000 MWh and 10,500 MWh annually by 2030 and 2045, respectively. All scenarios were modeled with consistent solar generation assumptions over time. Consequently, in scenarios with higher rates of building electrification and EV penetration, the additional solar generation has a reduced effect in offsetting the increased electricity consumption. Table 10 further details the annual net electricity consumption by scenario and by milestone year disaggregated by building electricity usage, EV charging usage, and impact of on-site solar generation. Based on the modeled scenarios, net electricity consumption is projected to increase by approximately 8,000 to 32,000 MWh by 2030 and 42,000 to 77,000 MWh by 2045 compared to current net electricity consumption, depending on the scenario. As shown in Table 10, for the Most Likely scenario, net electricity consumption is anticipated to increase by about 31% by 2030 and nearly 75% by 2045 compared with current annual net electricity consumption.
9.B.b
Packet Pg. 288 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
30 Figure 3 Annual Building Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected electricity consumption by buildings in megawatt hours (MWh) for each milestone year and across each scenario. Scenarios are ordered from highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend.
The exact value of each individual bar is described in the graph as white text.
9.B.b
Packet Pg. 289 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 31
Figure 4 Annual Building and Electric Vehicle Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected electricity consumption by buildings and EVs in megawatt hours (MWh) for each year of each scenario. Scenarios are ordered in highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend. The exact value of each individual bar is described in the graph as white text.
9.B.b
Packet Pg. 290 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
32 Figure 5 Annual Net Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected net electricity consumption of building and EVs in megawatt hours (MWh) for each year of each scenario with the inclusion of solar. The continued growth of solar on new and existing buildings helps drive a decrease in annual net electricity consumption in most scenarios compared to the electricity consumption without solar included ( Figure 4). Scenarios are ordered in highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend. The exact value of each individual bar is described in the graph as white text.
9.B.b
Packet Pg. 291 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 33
Table 10 Annual Electricity Consumption (MWh) by Scenario and Year Scenario 2025 2030 2035 2040 2045
Underachieve
Building Annual Electricity Consumption
(MWh)1
74,675 77,129 79,935 82,031 86,074
EV Annual Electricity Consumption
(MWh)2
2,995 7,487 13,477 22,462 40,433
Annual Electricity Consumption (MWh) 77,670 84,616 93,412 104,493 126,507 Solar Offset (MWh) -502 -3,014 -5,527 -8,038 -10,552
Net Annual Electricity Consumption
(MWh)
77,168 81,602 87,885 96,455 115,955
% Increase from Current Usage 5% 11% 19% 31% 58%
Most Likely
Building Annual Electricity Consumption
(MWh) 1
74,696 77,193 80,256 82,283 86,621
EV Annual Electricity Consumption
(MWh) 2
5,990 22,462 32,945 43,427 52,412
Annual Electricity Consumption (MWh) 80,686 99,655 113,201 125,710 139,033 Solar Offset (MWh) -502 -3,015 -5,527 -8,038 -10,551
Net Annual Electricity Consumption
(MWh)
80,184 96,640 107,674 117,672 128,482
% Increase from Current Usage 9% 31% 46% 60% 75%
Achieve
Building Annual Electricity Consumption
(MWh) 1
74,707 77,220 80,257 82,414 86,856
EV Annual Electricity Consumption
(MWh) 2
5,990 20,965 35,940 49,417 64,392
Annual Electricity Consumption (MWh) 80,697 98,185 116,197 131,831 151,248 Solar Offset (MWh) -502 -3,015 -5,527 -8,038 -10,551
Net Annual Electricity Consumption
(MWh)
80,195 95,170 110,670 123,793 140,697
% Increase from Current Usage 9% 29% 50% 68% 91%
Overachieve
Building Annual Electricity Consumption
(MWh) 1
74,676 77,333 81,095 83,876 89,083
EV Annual Electricity Consumption
(MWh) 2
7,488 31,447 44,924 58,401 71,879
Annual Electricity Consumption (MWh) 82,164 108,780 126,019 142,277 160,962 Solar Offset (MWh) -502 -3,014 -6,719 -8,038 -10,551
Net Annual Electricity consumption
(MWh)
81,662 105,766 119,300 134,239 150,411
9.B.b
Packet Pg. 292 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
34 % Increase from Current Usage 11% 44% 62% 82% 104%
1. Building electricity consumption presented here includes electricity used for EV charging as of 2023 due to the inclusion of EV charging electricity usage included in the base data from Healdsburg Electric.
2. EV electricity consumption encompasses all new EV charging consumption post-2023.
Monthly Electricity Consumption
To better understand electricity consumption throughout the year monthly electricity consumption for each scenario was also analyzed.
Figure 6 demonstrates the modeled monthly electricity consumption by buildings under each scenario while
Figure 7 demonstrates the modeled monthly electricity consumption by buildings and EVs under each scenario. As shown in
Figure 6, electricity consumption for buildings will continue to be largest in winter months (e.g., December and January) and summer months (e.g. July and August), coinciding with the coldest and hottest times periods where electricity consumption for heating and cooling is at highest demand.
While current trends show similar consumption in the winter and summer months, modeled scenarios show that at higher electrification rates such as those reached by 2045, the electricity consumption in the winter may surpass the usage in the summer. This is due to the conversion of natural gas furnaces to electric heat pumps for heating.
The added consumption for EV charging, shown in
Figure 7, increases the overall monthly electricity consumption based on the number of EVs included in the modeled scenario. However, the general trends for the months with highest consumption remain similar to those trends observed in
Figure 6 just at a greater magnitude due the assumption that driving behaviors are the same throughout the year. As shown in
Figure 8, the addition of solar on new and existing buildings is able to offset some of the increased electricity consumption from building and vehicle electrification.
A comparison between
Figure 7 and
Figure 8 show that increased solar generation has the greatest impact on the monthly net electricity consumption occurring in the summer when solar generation is at its highest. For example, in the Overachieve scenario in 2045, the monthly electricity consumption in January is nearly 15,000 MWh and approximately 13,750 MWh in July and August, a 1,250 MWh difference between the winter and summer monthly usage (
Figure 7). On the other hand, with the addition of solar, in the Overachieve scenario in 2045, the monthly net electricity consumption in January is only slightly lowered to approximately 14,800 MWh while in July and August the monthly net electricity consumption drops to approximately 12,500 MWh, a 2,300 MWh difference between the winter and summer monthly net electricity consumption (
Figure 8).
9.B.b
Packet Pg. 293 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 35
Figure 6 Monthly Building Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly electricity consumption by buildings in megawatt hours (MWh) for each milestone year and across each scenario. Scenarios are color coded as described in the legend.
9.B.b
Packet Pg. 294 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
36 Figure 7 Monthly Building and Electric Vehicle Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly electricity consumption by buildings and EVs in megawatt hours (MWh) for each year of each scenario. Scenarios are color coded as described in the legend.
9.B.b
Packet Pg. 295 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 37
Figure 8 Monthly Net Electricity Consumption (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly net electricity consumption of building and EVs in megawatt hours (MWh) for each year of each scenario with the inclusion of solar. Scenarios are color coded as described in the legend.
Peak Demand
The electricity grid is built to meet/exceed peak demand. As peak demand increases, the grid will need to be improved to handle these new peak loads. The following section discusses the peak demand39 for each of the scenarios determined on an annual basis as well as on a monthly basis.
Figure 9 summarizes the peak demand from buildings only on an annual basis while Figure 10 shows the peak demand from buildings only by month for all scenarios for each milestone year modeled. As shown in
Figure 9 and
Figure 10, when evaluating just building peak demand, in all the scenarios the peak demand is modeled to occur on August 6th at 6 pm. This is due in part to August 6th being one of the three hottest days in 2023, the year in which the baseline electricity consumption is based on. Further as shown in
39 The hourly model produced results for the maximum hour electricity consumption during different time frames, which is referred to in this section as the peak demand. Instantaneous peak demand is estimated to be approximately 5% higher than the maximum hour electricity consumption.
9.B.b
Packet Pg. 296 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
38 Figure 10, the monthly peak demand occurs between 5 and 6pm coinciding with people returning home from work and increased use of appliances (especially AC units) at the home. As shown, building electrification under all scenarios has a relatively minor impact on peak demand through 2030, adding up to 0.44 MWh or a 2% increase to current peak demand compared with the highest electrification scenario modeled (Overachieve). By 2045, peak demand from building electrification could increase peak demand by an additional 1.57 MWh or a 7% increase beyond current peak demand under a 100% electrification scenario as shown in the Overachieve scenario.
Figure 9 Annual Building Peak Demand (MWh) For Each Year of Each Modeled Scenario.
The above figure depicts the expected annual peak demand in megawatt hours (MWh) for the maximum hour electricity consumption for buildings across each year for each scenario. Scenarios are ordered from highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend. The exact value of each individual bar is described in the graph as white text. The legend indicates the symbol to represent the day and time peak demand occurred.
9.B.b
Packet Pg. 297 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 39
Figure 10 Monthly Building Peak Demand (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly peak demand in megawatt hours (MWh) for the maximum hour electricty consumption for buildings across each year for each scenario. The legend indicates the symbol to represent the time of day peak demand occurred in a given month.
Figure 11 summarizes the peak demand from buildings and EVs on an annual basis, while Figure 12 shows the peak demand from buildings and EVs on a monthly basis for all scenarios for each milestone year modeled. As shown in
Figure 11, peak demand could increase beyond current peak demand by 4% to 9% in 2030 and between 24% and 77% in 2045 depending on the modeled scenario. Based on the Most Likely scenario, peak demand is anticipated to increase by about 1.59 MWh or 7% in 2030 and 9.50 MWh or 44% in 2045 compared with current peak demand.
Figure 12 further demonstrates that the timing of peak demand is anticipated to change with increasing penetration of EVs. For all scenarios, through 2030 the peak demand is modeled to occur August 6th at 6pm. As previously described, the date coincides with one of the hottest days of the baseline year and at a time when people are coming home from work. However, by 2045, for all scenarios the peak demand is modeled to occur on February 23rd at 7 am coinciding with one of the coldest days of the baseline year and at a time when people are getting ready to leave for work and their cars are finishing up their charging.
9.B.b
Packet Pg. 298 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
40 This is likely due to two interacting factors. First, as described in Monthly , the electricity consumption in the winter months for heating is anticipated to increase as building electrification results in the replacement of natural gas furnaces with electric heat pumps. This is illustrated in Figure 10 where peak demand in buildings increases with increasing electrification occurring through 2045 and the peak demand in winter months increases at a greater magnitude than the peak demand in summer months (though the summer peak still remains much higher than the winter peak in buildings). The second factor contributing to the trends observed in Figure 11 and
Figure 12, is the EV charging regime modeled and the increasing penetration of EVs modeled over time. As detailed in Electric Vehicle Charging, by 2045 every scenario assumes more than half of all vehicles will be EVs. Further, the Healdsburg-specific charging regime modeled for all scenarios assumes that home charging will be delayed and programmed to finish by departure (i.e., in time for the morning commute). As more EVs are charging with a home charging regime to finish by departure, the electricity demand just before people leave for work will continue to increase. As shown in
Figure 12, these compounding factors start to shift the peak demand from the evening of the hottest days of the year to the mornings of the coldest days of the year. Faster EV adoption results in an earlier shift from summer to winter peaks. For example, in the Overachieve scenario, the peak demand transitions from August 6th at 6pm to February 23rd at 7am between 2030 and 2035, while for the Underachieve scenario, with a lowest number of EVs modeled, the peak demand does not transition to the February 23rd date until the 2045 year ( Figure 11). Comparison of
Figure 10 and
Figure 12 demonstrate that the shift in timing of peak demand is largely driven by the increasing number of EVs rather than changes in peak demand from buildings. Further, this shift is largely dependent on the EV charging regime modeled – changes or greater diversity in the charging strategy deployed by EV users can have significant impacts on when the peak demand may occur.
See Timing and Type of EV Charging for additional discussion regarding impacts of EV charging strategy and behavior.
9.B.b
Packet Pg. 299 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 41
Figure 11 Annual Building and EV Peak Demand (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected annual peak demand in megawatt hours (MWh) for the maximum hour electricity consumption for buildings and EVs across each year for each scenario.
Scenarios are ordered from highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend. The exact value of each individual bar is described in the graph as white text. The legend indicates the symbol to represent the day and time peak demand occurred.
9.B.b
Packet Pg. 300 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
42 Figure 12 Monthly Building and EV Peak Demand (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected monthly peak demand in megawatt hours (MWh) for the maximum hour electricity consumption for buildings and EVs across each year for each scenario. The legend indicates the symbol to represent the time of day peak demand occurred in a given month.
Figure 13 summarizes the annual net peak demand from buildings and EVs for all scenarios for each milestone year modeled with the inclusion of solar, while Figure 14 shows the net peak demand from buildings and EVs on a monthly basis with solar included. Comparison between
Figure 11 and
Figure 13 demonstrate solar has the ability to offset peak demand by up to 0.05 MWh both in 2030 and 2045. While solar generation is anticipated to grow significantly between 2030 and 2045, solar offsetting potential is highest in summer months when longer daylight hours result in higher solar generation. So as the peak demand shifts from summer months to winter months the impact of solar on the peak demand begins to change. For example, in 2040 when the peak demand for the Underachieve scenario is occurring in August the addition of solar is modeled to offset peak demand by 0.12 MWh whereas in 2045 when the peak demand is modeled to occur in February when solar generation is lower, solar is modeled to offset only 0.05 MWh from the peak demand. Further, as solar generation increases this can influence when the peak demand occurs. For example, it is observed in
9.B.b
Packet Pg. 301 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 43
Figure 11 that the peak demand in the Achieve scenario in 2035 occurs on the August 6th date in the evening, whereas with the addition of solar, the net peak demand is now observed on February 23rd in the morning as shown in
Figure 13.
Figure 14 demonstrates the modeled monthly net peak demand for each scenario of each milestone year with the inclusion of solar. While the trends in
Figure 14 with solar inclusion and
Figure 12 with no solar inclusion are similar,
Figure 14 shows that solar does offset the peak demand to varying degrees with the greatest impact on peak demand occurring in the summer months when solar generation is at its highest. See Impact of Timing on Peak Demand for additional information on the interaction of solar generation and peak demands in winter and summer.
Table 11 further details the net peak demand by scenario and by milestone year disaggregated by building demand, EV charging demand, and impact of solar generation. Based on the modeled scenarios, net peak demand is projected to increase by approximately 0.8 to 1.98 MWh by 2030 and
5.09 to 16.55 MWh by 2045 compared to current net peak demand, depending on the scenario. As shown in Table 11, for the Most Likely scenario, net peak demand is anticipated to increase by about 7% by 2030 and nearly 44% by 2045 compared with current net peak demand.
9.B.b
Packet Pg. 302 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
44 Figure 13 Annual Net Peak Demand (MWh) For Each Year of Each Modeled Scenario. The above figure depicts the expected annual net peak demand in megawatt hours (MWh) for the maximum hour net electricity consumption for buildings and EVs across each year for each scenario with inclusion of solar. Scenarios are ordered from highest achieving to lowest and the grouped bars for each year are in the same order as described in the legend. The exact value of each individual bar is described in the graph as white text. The legend indicates the symbol to represent the day and time peak demand occurred.
Figure 14 Monthly Net Peak Demand (MWh) For Each Year of Each Modeled Scenario.
The above figure depicts the expected monthly net peak demand in megawatt hours (MWh) for the maximum hour electricity consumption for buildings and EVs across each year for each scenario with solar inclusion. The legend indicates the symbol to represent the time of day peak demand occurred in a given month.
9.B.b
Packet Pg. 303 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 45
Table 11 Peak Demand40 (MWh) by Scenario and Year
Scenario 2025 2030 2035 2040 2045
Underachieve
Building Peak Demand (MWh) 21.59 21.92 22.25 22.56 22.99 EV Peak Demand (MWh) 0.15 0.37 0.68 1.13 3.60
Peak Demand (MWh) 21.74 22.29 22.93 23.69 26.59
Solar Peak Demand Offset (MWh) 0.00 -0.04 -0.08 -0.12 -0.05 Net Peak Demand (MWh) 21.74 22.25 22.85 23.57 26.54
% Increase from Current Peak Demand 1% 4% 7% 10% 24%
Most Likely
Building Peak Demand (MWh) 21.59 21.91 22.23 22.48 22.91 EV Peak Demand (MWh) 0.30 1.13 1.66 4.48 8.04
Peak Demand (MWh) 21.89 23.04 23.89 26.96 30.95
Solar Peak Demand Offset (MWh) 0.00 -0.04 -0.08 -0.03 -0.04 Net Peak Demand (MWh) 21.89 23.00 23.81 26.93 30.91
% Increase from Current Peak Demand 2% 7% 11% 26% 44%
Achieve
Building Peak Demand (MWh) 21.59 21.91 22.24 22.55 23.01 EV Peak Demand (MWh) 0.30 1.05 1.82 6.58 12.24
Peak Demand (MWh) 21.89 22.96 24.06 29.13 35.25
Solar Peak Demand Offset (MWh) 0.00 -0.04 -0.07 -0.04 -0.05 Net Peak Demand (MWh) 21.89 22.92 23.99 29.09 35.20
% Increase from Current Peak Demand 2% 7% 12% 36% 64%
Overachieve
Building Peak Demand (MWh) 21.58 21.89 22.24 22.55 23.02 EV Peak Demand (MWh) 0.38 1.59 5.01 9.83 15.03
Peak Demand (MWh) 21.96 23.48 27.25 32.38 38.05
Solar Peak Demand Offset (MWh) -0.01 -0.05 -0.03 -0.03 -0.05 Net Peak Demand (MWh) 21.95 23.43 27.22 32.35 38.00
% Increase from Current Peak Demand 2% 9% 27% 51% 77%
40 The hourly model produced results for the maximum hour electricity consumption during different time frames, which is referred to in this section as the peak demand. Instantaneous peak demand is estimated to be approximately 5% higher than the maximum hour electricity consumption.
9.B.b
Packet Pg. 304 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
46 Timing and Type of EV Charging
Based on the analysis, EV charging will be the major driver of peak demand as buildings and vehicles are electrified. However, while building electricity consumption and peak demand is largely driven by factors such as weather and temperature, EV charging electricity consumption and peak demand is largely driven by behavior. The Most Likely scenario was used to further analyze monthly peak demand for each forecast year under different EV charging regimes. EV charging regimes used for this analysis included the Healdsburg-specific case, as used in all modeled scenarios discussed thus far, as well as the EVI-Pro default Base and Best Case scenarios as defined in Table 8. The variables most influential of peak demand in relation to EV usage include the following:
▪ Charger speed (e.g., Level 1 vs Level 2)
▪ Charger location (e.g., workplace vs home)
▪ Timing of charging
▪ Charging strategy (e.g., fast as possible, slow as possible) ▪ Fleet make-up efficiency of the EV (e.g., the percentage of EV fleet anticipated to be passenger EVs vs SUVs, trucks or commercial EVs)
▪ Miles driven per day
Total miles driven, energy efficiency of the vehicles, and the fleet make up (e.g., light-duty vs heavyduty) are the primary drivers in the electricity consumption associated with EV charging. For peak demand, charging behavior such as whether the vehicle is charged as fast as possible, or as slow as possible and timing of charging significantly impacts peak demand. Refer to Table 8 for details on input parameters for Healdsburg-specific, Base, and Best Cases.
As shown in
Figure 15, under the Most Likely scenario, the Base Case results in net peak demand approximately 40% greater than current net peak demand in 2030 and 100% greater than current net peak demand in 2045 with the net peak demand always occurring in summer months (e.g. August) in the evening around 6pm. Similarly, under the Best Case, the net peak demand also occurs in the summer months and evening hour through 2045 though the net peak demand is only about 10% higher in 2030 and 30% higher in 2045. The Base Case employs an “immediate -fast as possible” charging strategy while the Best Case employes an “immediate – slow as possible” charging strategy to even the spread of charging. Because both home charging strategies involve beginning to charge immediately, this overlaps with building peak demand. The result is net peak demand occurring during summer evenings. However, the Best Case “slow as possible” strategy shows a significantly reduced impact to the net peak demand compared with the Base Case by smoothing the spread of charging throughout the night when overall building demand is low. In contrast, the Healdsburgspecific Case employs a “delayed – finish by departure” strategy that shifts charging time to occur early in the morning prior to departure. This results in the summer peak being offset to a greater extent than in the Base and Best-Case scenario with only about a 5% increase by 2030 and 16% increase by 2045 compared with current summer net peak demand. However, while this charging strategy reduces the impact on the summer net peak demand it does increase the prevalence of a winter net peak demand in the morning that coincides with the building electricity winter peak demand. This results in a winter net peak demand that is about 50% greater in 2030 and 150% greater in 2045 than the currently observed winter net peak demand. Overall, this results in an annual net peak demand that is about 45% higher than current net peak demand by 2045 and with a shift in net peak demand from summer evenings to winter mornings.
9.B.b
Packet Pg. 305 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 47
As previously described, building peak demand differs in the summer and winter months where in the summer building peak demand occurs in the evenings when people are arriving home from work, cooling demand is high and solar generation is reducing. In the winter, building net peak demand occurs early in the morning when people are starting their day, heating demand is high, and solar generation for the day has not started yet. While building net peak demand currently occurs in the summer, the magnitude of electricity needed for EV charging can shift the overall net peak demand to whenever the bulk of EV charging is taking place. When the EV charging peak demand aligns with the building peak demand, higher impacts to the grid are observed. This occurrence can be seen in
Figure 15, where for the Most Likely scenario under the Healdsburg-specific Case a winter net peak demand in February grows over time as charging demand for EVs increases with increasing EV penetration. By 2040, the winter net peak demand in the Most Likely scenario is larger than the summer net peak demand previously observed. This is due to EV electricity demand dominating the net peak demand over building electricity demand by 2040 and the timing of EV electricity demand under a “delayed- finish by departure” charging strategy causing an early morning peak demand for EV charging.
Based on the analysis of current annual net electricity consumption and net peak demand and anticipated levels of electrification, EV charging is expected to be the primary driver of future electricity consumption and peak demand. This is due to increased electricity consumption in the building stock being partially offset by the energy efficiency of new electric appliances, the anticipated increase in solar arrays due to building code requirements, and the comparatively large amount of electricity needed to move a large vehicle at high speeds. The results of this analysis also provide insight into the importance of EV charging behavior. If EV charging can be incentivized to occur during off-peak hours and spread across the day with both at home and workplace charging, the overall impact to the grid can be greatly reduced. Alternatively, if charging occurs at the same time across the city and at a time that coincides with the summer afternoon or winter morning building peak demand, then the grid impacts will be exacerbated.
9.B.b
Packet Pg. 306 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
48 Figure 15 Monthly Net Peak Demand (MWh) for Each Year for the Most Likely Scenario Under Varying EV Charging Regimes. The above figure depicts the expected monthly net peak demand in megawatt (MWh) for the maximum hour net electricity consumption for the Most Likely scenario under different EV charging regimes including: Healdsburg-specific Case denoted as “Most Likely”, Base Case deonated as “Most Likely Base”, and Best Case denoted as “Most Likely Best” in the legend. These curves include building and EV electricity demand with the inclusion of solar. The legend shows the time of day for each month’s peak demand as well as the corresponding symbol. Note that though evaluated, “Most Likely Worst” is not presented in the above graph as it results in net peak demand that far exceeds the presented scenarios, greatly altering the Y-axis and therefore limiting the ability to clearly see the trends presented. Further, the “Most Likely Worst” scenario is deemed to be highly unlikely and not representative of a trend that would be observed in actuality.
The Healdsburg-specific EV charging case requires Healdsburg to be successful in managed EV charging programs and promoting diversified charging behaviors amongst EV drivers. The Healdsburg-specific EV charging case uses the selection of charging for “delayed - finish by departure”. This is one of the primary objectives of Healdsburg’s new Home Energy Load Management Program – to avoid evening peak hours and strategically charge enrolled vehicles to meet their ready-by preferences while reducing grid impacts of many vehicles all charging at once overnight or in the early morning. Healdsburg has also implemented pricing structure changes at its public EV chargers to discourage charging during evening peak hours and provides commercial EV charger rebates to promote workplace charging. Programs such as these will be critical to avoid adding onto the existing summer cooling peak demand, compounding early morning winter peak demands due to building electrification combined with overnight EV charging, or creating a new peak if enough EVs are all scheduled to start charging at the same time, such as midnight. Ideally, EV drivers will charge as much as possible from the mid-morning through earlyafternoon to take advantage of adbundant solar resources on the grid, as well as avoid seasonal peak
9.B.b
Packet Pg. 307 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 49
hours (winter and summer) and diversify their overnight charging. Survey results for when EV drivers plan to charge were varied, but the highest preference was for overnight at home starting right when they get home during current evening peak demands. To avoid the high peaks shown in the model when using the Base Case, Best Case or even the Healdsburg-specifc Case, Healdsburg will need more participation in its EV programs to manage loads and substantial outreach on desired charging behaviors, as well as evaluation of time-of-use (TOU) rate improvements.
Impact of Timing on Peak Demand
As demonstrated in the previous sections, the interaction between building electricity demand, EV charging demand, and solar generation play an influential role in when peak demand occurs. To further demonstrate this interaction as it relates to seasonal changes in peak demand, a daily electricity demand curve for an average summer day (in July) and an average winter day (in January) was prepared. This demonstration scenario was modeled based on the electricity demand for 250 new single-family buildings, 500 EVs following the Healdsburg-specific EV charging case, and 250 3.5 kW solar arrays to correspond with a single 3.5 kW array added per new single-family building. As shown in
Figure 16, on a typical July day, a new single-family building shows a steady increase in electricity consumption throughout the day starting around 6am and peaking around 6 to 7pm, while EV charging peaks between 6 and 8am. However, the large peak in solar generation in the middle of the day is able to completely offset the electricity demand occurring in the middle of the day. This results in an overall daily curve that peaks in the morning between 6 and 7am. At this time of day solar energy is just getting started and can only marginally decrease the EV charging electricity demand. The buildings’ overall demand drops sharply off as solar generation increases resulting in more electricity being sent to the grid than being consumed during the middle of the day such that the daily curve actually shows a negative demand41. The curve also shows another slightly small evening peak occurs between 6 and 7pm as solar generation for the day decreases and people are arriving home from work and building electricity demand increases.
Figure 17 also demonstrates the daily electricity demand curves for buildings, EV charging, and solar generation but over the course of an average winter day (in January). As shown, EV charging follows a similar trend as in the summer day where EV charging demand peaks in the morning between 6 and 7am. This is due to the use of the “delayed – finish by departure” charging strategy where charging is primarily occurring just before people leave the house in the morning. In contrast to the building electricity curve for the summer day, in the winter, the new single-family home electricity consumption has a peak that occurs around 10 am and another that occurs around 9pm and extends through midnight. Although solar generation does occur in the winter, it is to a lesser degree than in the summer and is not enough to completely offset the electricity consumption occurring in the middle of the day. This results in an overall daily peak occurring between 6 and 7am that is larger than the EV charging peak due to the coinciding building electricity and EV charging demands and limited solar generation available to offset the peak. The daily curve does drop in the middle of the day offsetting some fraction of the EV and building electricity demands. A small evening peak also occurs between 4 to 5pm as solar generation is decreasing, and people are 41 Note that the Model can also be used to identify negative and minimum hourly demands, which are also important to ensure that Healdsburg is not pushing excess solar generation back into the transmission system. Strategic EV and battery storage charging could also help to maintain minimum demands and avoid ‘back feeding’ into the transmission system as solar installations increase.
9.B.b
Packet Pg. 308 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
50 arriving home from work where there is again coinciding EV charging and building electricity demand.
Note that this demonstration scenario assumes two EVs for every new and efficient single-family home, as such EV charging drives the timing of the peak demand in this demonstration. As previously discussed, peak demand analysis of the entire Healdsburg building stock and forecasted EV penetration rates under the modeled scenarios show the peak demand occurring in the evenings in the summer months until EV charging begins to dominate demand causing the peak to shift to the morning.
Figure 16 Example of Daily Electricity Demand Curve (MWh) on an Average Summer Day. The above figure depicts the electricity consumption curve in megawatt hours (MWh) for a single day for 250 new single-family buildings, 500 EVs, and 250 3.5 kW solar arrays as well as the cumulative curve for all of the indicated electricity uses. This graph was developed to provide an example of how the electricity consumption curves from buildings, EV charging, and solar generation interact on an average summer day.
9.B.b
Packet Pg. 309 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 51
Figure 17 Example of Daily Electricity Demand Curve (MWh) on a Average Winter Day.
The above figure depicts the electricity consumption curve in megawatt hours (MWh) for a single day for 250 new single-family buildings, 500 EVs, and 250 3.5 kW solar arrays as well as the cumulative curve for all of the indicated electricity uses. This graph was developed to provide an example of how the electricity consumption curves from buildings, EV charging, and solar generation interact on an average winter day.
The timing for the community-wide net peak demand will also change over time with more electrification. Figure 18 and Figure 19 demonstrate current city-wide hourly electricity consumption compared to hourly electricity consumption in the Most Likely scenario in 2045. Figure 18 shows the winter peak day and Figure 19 shows the summer peak day.
9.B.b
Packet Pg. 310 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
52 Figure 18 Example of Daily Electricity Demand Curve (kWh) on a Winter Peak Day. The above figure compares the city-wide hourly electricity consumption in kilowatt hours (kWh) for the winter peak day (Feburary 23) from the current 2023 baseline and the Most Likely scenario in 2045.
Figure 19 Example of Daily Electricity Demand Curve (kWh) on a Summer Peak Day. The above figure compares the city-wide hourly electricity consumption in kilowatt hours (kWh) for the summer peak day (August 6) from the current 2023 baseline and the Most Likely scenario in 2045.
9.B.b
Packet Pg. 311 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Results
Long-Range Community Electricity Scenarios 53
Appliance Electricity Demand
To further investigate the cause of the building electricity peaks occurring on an average summer and average winter day shown in
Figure 16 and
Figure 17, respectively, the individual daily demand curves for each end-use in a single-family home was modeled. As shown in
Figure 20, the net peak demand for a single-family home on an average July day is largely driven by electricity demand for cooling. Electricity demand for general plug load is also shown to steadily increase throughout the day with the highest use occurring between 8pm to midnight. This results in an overall single-family building electricity daily demand curve peaking between 6 and 7pm on an average summer day as also shown in shown in
Figure 16.
Figure 21 shows that the 10 am single-family home building peak observed in Figure 17 occurring at 10am on an average winter day is largely driven by heating demand that peaks at 10am.
Figure 20 Example of Daily Electricity Demand Curve by Building End-use (kWh) on an Average Summer Day. The above figure depicts the electricity consumption curve in kilowatt hours (kWh) for each electrical end-use (e.g., cooling, heating, hot water heating, plug load) modeled in a new single-family home on a average day in July. This graph was developed to provide an example of how the
9.B.b
Packet Pg. 312 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
54 electricity consumption curves from individual end-uses contribute to the overall buidling electricity demand curve.
Figure 21 Example of Daily Electricity Demand Curve by Building End-use (kWh) on an Average Winter Day. The above figure depicts the electricity consumption curve in kilowatt hours (kWh) for each electrical end-use (e.g., cooling, heating, hot water heating, plug load) modeled in a new single-family home on a average day in January. This graph was developed to provide an example of how the electricity consumption curves from individual end-uses contribute to the overall buidling electricity demand curve.
9.B.b
Packet Pg. 313 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Findings
Long-Range Community Electricity Scenarios 55
5 Findings
This section presents the key results of the study, highlighting significant trends and patterns observed in the data. The analysis reveals critical insights into building and vehicle electrification, demonstrating drivers of electricity consumption and peak demand. These findings provide a deeper understanding for Healdsburg Electric as they plan for the continued electrification of Healdsburg.
5.1 Summary of Results
Key Results
Results for all forecasted scenarios are presented in terms of electricity consumption (i.e., no solar included) and net electricity consumption (i.e., with solar included) on an annual, monthly, and peak demand maximum hour electricity consumption basis. Electricity consumption shows the total electricity needed to power homes, businesses, and vehicles in Healdsburg. As electricity consumption increases, the utility will need to procure and deploy additional resources to meet this demand. Net electricity consumption shows the total electricity expected with the inclusion of solar generation that can offset some electricity consumption. The Overachieve scenario provides an upper limit for possible electricity consumption under full electrification while the Most Likely scenario results demonstrate the annual, monthly, and peak demand that are likely to be most representative of future conditions. This section summarizes the key results based on the Most Likely scenario.
▪ Annual electricity consumption (i.e., building electricity and EV charging consumption without solar) is modeled to increase by 26,063 MWh (35%) by 2030 and 65,441 MWh (89%) by 2045 compared with current net annual electricity consumption of 73,592 MWh. ▪ Annual net electricity consumption (i.e., building electricity and EV charging consumption with solar) is modeled to increase by 23,048 MWh by 2030 (31%) and 54,890 MWh (75%) by 2045 compared with current net annual electricity consumption of 73,592 MWh. ▪ Annual peak demand (i.e., building electricity and EV charging peak demand without solar) is modeled to increase by 1.59 MWh (7%) by 2030 and 9.50 MW (44%) by 2045 compared with current net peak demand of 21.45 MWh.
▪ Annual net peak demand (i.e., building electricity and EV charging peak demand with solar) is modeled to increase by 1.55 MWh (7%) by 2030 and 9.46 MW (44%) by 2045 compared with current net annual peak demand of 21.45 MWh.
▪ Through 2030 while EV penetration is anticipated to be less than 50% of the total registered vehicles, peak demand will continue to occur during summer months when building electricity use for cooling demand dominates peak demand. As EV penetration begins to exceed 50% of total registered vehicles post-2030, EV charging will begin to be the dominant driver of peak demand. Depending on the charging strategy utilized and other EV managed charging strategies, this can shift the timing of peak demand from summer evenings to winter mornings.
9.B.b
Packet Pg. 314 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
56 Assumption Limitations
Like any model this Model was developed based on a series of assumptions that can impact the resulting annual usage and peak demand, increasing or decreasing anticipated values. The following highlights key assumptions and the potential impacts that should be considered when planning:
▪ Building Equipment: This analysis uses the building equipment assumptions provided by the ResStock and ComStock models. While these models use real building data collected from thousands of surveys, they only estimate the exact buildings within Healdsburg. For example, if significantly more cooling or less cooling is present or there is significantly higher or lower presence of RTU’s in commercial buildings, then the results will be skewed. However, these models represent the best available data for assessing an entire city’s building stock. ▪ Building Time of Use: The ResStock and Comstock model savings curves provide 15-minute energy use data across the entire year. However, this data is averaged across the 3C climate zone which includes a wider area beyond just Healdsburg. Therefore, the actual time of use data in Healdsburg may be different.
▪ Stacked impacts: The ResStock savings curve used to estimate electricity increases/savings were taken from a package of electrification measures that interact with each other. The following description is provided by ResStock “For a systems level description, ResStock models the heat transfer of individual representative dwelling units. Any device, person, or animal in the home giving off heat will impact the heat transfer between the interior of the home and the exterior environment. As such, nearly all of the ResStock upgrades interact on a heat transfer level and this will impact both the necessary equipment size for heating and cooling the home as well as the operation time and necessary energy.” Therefore, at low levels of electrification, the results may be skewed as these interactions are not accurately modeled. However, these impacts are expected to be minimal for this use case.42
▪ EV charging regime: The presented results modeled a Healdsburg-specific EV charging regime that utilizes a “delayed -finish by departure” charging strategy. This charging strategy has a significant impact on both the timing of the peak demand and the peak capacity needed. As demonstrated in Timing and Type of EV Charging, use of other EV charging strategies such as “immediate – as fast as possible” or “immediate – as slow as possible” can shift the timing of peak demand and the anticipated change in peak demand. As demonstrated in ▪ Figure 15, EV charging strategy can result in a 10% to 40% increase in 2030 and 30% to 100% increase in 2045 beyond the current peak demand for the Most Likely Scenario. ▪ EV Size: EV’s have a wide range of efficiencies from 1 mile per kWh to over 4 miles per kWh, over a 400% difference. The assumptions within the Healdsburg-specific EV charging regime assume an efficiency of 2 miles per kWh on average.43
Potential Adjustments to Model Results
During Model development various items were identified that could impact model results but were not within the scope of the project to model and are expected to have a relatively small impact. 42https://nrel.github.io/ResStock.github.io/docs/resources/explanations/Individual_Measures_Not_Combined.html 43 https://www.energy.gov/eere/vehicles/articles/fotw-1374-december-23-2024-model-year-2024-electric-vehicles-offer-consumers
9.B.b
Packet Pg. 315 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Findings
Long-Range Community Electricity Scenarios 57
It was not within the scope of this project to model all possible residential and commercial appliances that could be switched to electric applicances. For example, gas fireplaces, pool heaters, spas, cooktops in commercial buildings, and water heaters in commercial buildings are not included.
Most of these are expected to have a relatively small impact; however, heat pump water heaters in commercial buildings have the potential to add large electricity usage increases. If commercial heat pump water heater installations occur at the same rate as heat pump boilers in the Most Likely scenario, this could increase annual electric consumption and demand as shown in Table 12 below.
Since commercial buildings are mostly operating during the daytime, it is unlikely that substantial demand from commercial heat pump water heaters will overlap with the peak demands identified in the model.
Table 12 Potential Electricity Increase with Addition of Commercial Heat Pump Water Heaters
2025 2030 2035 2040 2045
Annual
Electricity
Consumption
Increase (MWh)
55.38 198.42 431.13 670.47 923.08
Demand
Increase (MW) 0.002 0.005 0.012 0.019 0.026
Healdsburg Electric Department also recently completed a forecast for energy efficiency program achievable savings, such as electricity savings from inuslation, lighting, clothes washers and more. If the efficiency program targets are achieved, they could reduce annual electric consumption and demand as shown in Table 13 below. Again, since the majority of savings come from the commercial sector operations, it is unlikely that substantial demand reductions from energy efficiency projects will overlap with the peak demands identified in the model.
Table 13 Potential Electricity Savings with Implementation of Energy Efficiency Program Electricity 2025 2030 2035 2040 2045
Annual
Electricity
Consumption
Increase (MWh)
-117.28 -625.37 -1,329.49 -1,949.52 -2,244.56
Demand
Increase (MW) -0.032 -0.151 -0.300 -0.395 -0.429
When modeling for new residential homes, the total energy consumption of the home was modeled. Although most of these buildings would be all electric or near 100% electric there are some end-uses that would still include small amounts of natural gas consumption such as outdoor grills or fireplaces that are accounted for in that total energy consumption. Due to this, the Model overestimates electricity consumption by new residential buildings by about 1-2%. Since electricity from new residential buildings make up approximately 2% and 7% of total Modeled electricity consumption in 2030 and 2045, respectively, the impact to modeled consumption is considered negligible. Additionally, as described in New Building Estimates, all modeled new residential buildings were based on the EUSS from ResStock using the whole home electrification and envelope upgrade scenario (Upgrade 11). The number of new residential buildings modeled was based on customer projections and the percent of new builds assumed to be 100% electric based on the modeled scenario (Table 3). As such, the new residential buildings that were not all electric were not
9.B.b
Packet Pg. 316 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
58 accounted for in the modeled results. In the Underachieve, Achieve, Most Likely, and Overachieve sceanario this equated to 20%, 5%, 10%, and 0% of new residential buildings not being accounted for, respectively. Based on per building electricity consumption for residential buildings, the unaccounted for non all-electric new buildings would add between 0.1% and 0.5% additional electricity to the total electricity consumption modeled in 2030 depending on the scenario. In 2045, depending on the scenario, the unaccounted for non all-electric new buildings would add between
0.4% and 1.7% additional electricity to the total electricity consumption.
When procuring electricity resources, there is also a need to procure for 4% system losses in the transmission and distribution, as well as maintaining planning reserve margins. The model may have also underestimated some opportunities for electricity consumption increases, such as EV drivers intentionally ‘filling up’ in Healdsburg or other items that were not considered as part of this Model.
Additionally, the model forecasts future peak demands based on maximum hour electricity consumption; however, the Electric Department must be ready and able to service instanteous demands on the system. In reviewing Electric Department data for shorter peak demand windows (e.g., 5 minute and 15 minute), the actual peak demand is generally 4-5% higher than the maximum hour consumption. Additionally, there is a ‘Resource Adequacy’ margin requirement of at least 15%.
Table 14 and Table 15 below shows the results of the Most Likley scenario with a 10% increase in annual consumption and a 20% increase in peak demand as a planning margin, to better serve for procurement and planning purposes to ensure sufficient resources and infrastructure are available to meet electricity needs. Table 14 does not include on-site solar generation assumptions while Table 15 does include assumptions of on-site solar generation offsets.
Table 14 Most Likely Scenario Electricity Consumption and Peak Demand with Planning Margin without Additional On-Site Solar
Electricity 2025 2030 2035 2040 2045
Annual
Electricity
Consumption –
Procurement
Target (MWh)1
88,755 109,621 124,521 138,281 152,936
Peak Demand –
for Infrastructure
Planning (MW)2
26.268 27.648 28.668 32.352 37.14
1. A planning margin of an additional 10% was applied to the annual electricity consumption (i.e., solar not accounted for)
2. A planning margin of an additional 20% was applied to the peak demand (i.e., solar not accounted for) Table 15 Most Likely Scenario Net Electricity Consumption and Peak Demand with Planning Margin with Additional On-Site Solar
Electricity 2025 2030 2035 2040 2045
Annual Net
Electricity
Consumption –
Procurement
Target (MWh)1
88,202 106,304 118,441 129,439 141,330
Net Peak
Demand – for
Infrastructure
Planning (MW)2
26.27 27.60 28.57 32.32 37.09
9.B.b
Packet Pg. 317 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Findings
Long-Range Community Electricity Scenarios 59
1. A planning margin of an additional 10% was applied to the annual net electricity consumption (i.e., additional onsite solar accounted for)
2. A planning margin of an additional 20% was applied to the net peak demand (i.e., additional on-site solar accounted for)
Comparisons of Other Forecasts
The California Energy Comission (CEC) also published a Local Reliability Scenario net electicity consumption forecast for each utility in California in 2023. As shown in the Figure 24 below, the CEC forecast generally falls within the model scenarios, though starts out closer to the Underachieve scenario in 2030 and ends up closer to the Overachieve and Most Likely with Planning Margin scenarios in 2040. Based on the CEC’s Local Reliability Scenario, the Healdsburg average annual growth for 2023-2040 is 3.55%. This is based on a larger planning area model, which may limit the amount of Healdsburg-specific data used for the forecast. In the same CEC study, the PG&E Greater Bay Area Service Area is forecasted to have an annual average net electricity consumption growth of
2.85% and the NCPA Greater Bay Area is expected to have 2.77%. The Healdsburg Most Likley scenario has an annual average growth of 2.39%.
Figure 22 Comparison of Modeled Scenarios and CEC Local Reliability Scenario Forecasted Potential Future Electricity Consumption. The above figure depicts the potential future net electricity consumption in megawatt hours (MWh) based on the modeled sceanrios presented in this report compared with CEC Local Reliability Scenario forecasted net electricity consumption. Note that the CEC forecast only goes through 2040 and was extended to 2045 for this chart using an annual percentage increase of 3.55%.
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
2000 2005 2010 2015 2020 2025 2030 2035 2040 2045
MWh
Potential Future Electric Consumption
Current (2023) Current (2024)
Underachieve CMS Achieve CMS
Overachieve CMS Most Likely
CA Energy Commission Most Likely + Planning Margin
Most Likely + Hotter Summers
9.B.b
Packet Pg. 318 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
60 Based on the CEC’s analysis in the Integrated Energy Policy Report, peak demand in 2030 is anticipated to be approximately 10% higher than current peak demand and approximately 38% higher than current peak demand in 2040 as shown in
Figure 23. As discussed above, modeled peak demand for Healdsburg could increase beyond current peak demand by 4% to 9% in 2030 and between 10% and 51% in 2045 based on the Underachieve and Overachieve scenario, respectively. Based on the Most Likely scenario, peak demand is anticipated to increase by about 7% in 2030 and 26% in 2040, following a similar trajectory and trend line as the CEC peak demand analysis.
Figure 23 Managed System Peak Demand (California ISO) from the CEC’s 2023 Integrated Energy Policy Report. The above figure obtained from the CEC 2023 Integrated Energy Policy Report shows that statewide peak demand in megawatts (MW) is expected to increase by approximately 10% by 2030 and 38% by 2040 compared with 2023 statewide peak demand. 44 The recently completed Healdsburg energy efficiency program forecast also included a forecast of fuel substitution programs and resulting electricity increases. The energy efficiency programs forecast only considered building energy and did not forecast any changes in annual electric consumption due to electric vehicles or on-site solar installations. Table 16 below compares the energy efficiency program forecast and the Most Likely scenario without EVs or on-site solar. As shown, the energy efficiency forecast estimates for building electricity consumption are about 2 to 3% higher than the modeled Most Likely Scenario pre-2030. Post-2030, the energy efficiency 44 Bailey, Stephanie, Jennifer Campagna, Mathew Cooper, Quentin Gee, Heidi Javanbakht, and Ben Wender. 2023. 2023 Integrated Energy Policy Report. California Energy Commission. Publication Number: CEC-100-2023-001-CMF. Accessed at: 2023 Integrated Energy Policy Report
9.B.b
Packet Pg. 319 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Findings
Long-Range Community Electricity Scenarios 61
forecast scenario estimates are 9 to 13% higher than the modeled Most Likely Scenario. This is likely due to the Model developed for Healdsburg focusing on the electric conversion of primary end-uses including hot water heating, heating and cooling, dryers, and stoves. As such, other end-uses that could be converted to electric such as pool heaters or spas are not accounted for so the overall increase in electrical consumption could be underestimated. The energy efficiency forecast also utilized a different source for kWh impacts from switching to electric appliances and different assumptions for electric appliance adoption. This difference becomes more prominent in later milestone years as electrifcation of end-uses increases. The information presented in Table 16 indicates the appropraiteness of applying a 10% planning margin to the Most Likely Scenario results in this report for annual net electricity consumption planning.
Table 16 Comparison of Energy Efficiency Forecast and Most Likely Scenario Results for Annual Building Electricity Consumption
Annual Electricity
Consumption
2025 2030 2035 2040 2045
Energy Efficiency
Forecast (MWh) 76,413 79,186 87,303 93,051 97,996
Most Likely Scenario
Buildings only (MWh) 74,696 77,193 80,256 82,283 86,621 Difference (%) 2% 3% 9% 13% 13%
5.2 Expected Climate Change Impacts
Although not currently modeled, climate change is expected to significantly impact both annual usage and peak electricity demand. As climate change results in more hot days during summer months, the usage and demand for cooling will increase, leading to higher overall electricity consumption. For example, Healdsburg experienced about a 25% increase in electricity usage between July 2023 and July 2024, with five more days over 90 degrees and two more days over 100 degrees in July 2024 compared to July 2023. Additionally, in 2023 the peak demand occurred on a day that was 100 F. However, the peak was 23-28% higher in 2024 and 2022, with temperatures at 105 F and 114 F, respectively. This trend is indicative of future electricity usage as hotter summer days become more common. Peak demand is also expected to shift and intensify, particularly during heatwaves, as there is a greater need to run air conditioning or cooling systems for longer periods.
This can strain the power grid and necessitate infrastructure upgrades to ensure reliability and prevent outages. Conversely, milder winters may reduce the need for heating, slightly offsetting the increased summer consumption. Additionally, the extremes may get more extreme for both summer and winter seasons. However, the net effect is likely to be a substantial rise in annual electricity consumption. Overall, climate change will require significant adjustments in energy planning and infrastructure to accommodate these shifts in electricity demand, which could be considered in a future update to the scenarios.
Although it is very difficult to forecast climate change impacts, Table 17 below shows the Most Likely scenario with a 20% increase for July and August building consumption and a 20% increase in summer peak demand for buildings as an example of impacts of hotter summers.
Table 17 Potential Electricity Consumption and Peak Demand for Most Likely Scenario under Hotter Summers
Electricity 2025 2030 2035 2040 2045
9.B.b
Packet Pg. 320 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
62 Net Annual Electricity
Consumption (MWh) 82,901 99,432 110,548 120,604 131,535 Difference from Current
Annual Electricity
Consumption (%)
13% 35% 50% 64% 79%
Net Peak Demand
(MWh)
26.21 27.38 28.26 26.931 30.911
Difference from Current
Peak Demand (%)
22% 28% 32% 26% 44%
1. The net peak hourly demand value remain nearly the same as the Most Likely Scenario modeled under current conditions (Table 11). This is due to the peak moving from the summer to the winter by 2040 due to EV charging needs and therefore the net peak hourly demand not being impacted by hotter summers.
5.3 Challenges
Increased electricity consumption and peak demand present several significant challenges for utilities and grid operators. One major issue is the strain on existing infrastructure, which may not be equipped to handle the higher loads, leading to potential outages and reliability concerns.45 Additionally, the need for more generation capacity, often from renewable sources, requires substantial investment and time to develop.46 Peak demand periods can exacerbate these issues, as they necessitate the use of peaking power plants, which are typically less efficient and more expensive to operate, as well as rely on fossil fuels.
47 Furthermore, integrating new technologies
and managing the variability of renewable energy sources add complexity to grid management.
Addressing these challenges requires a combination of infrastructure upgrades, smart grid technologies, and effective demand-side management strategies.
Meeting State Requirements and Providing Electricity 24/7/365 The State’s Renewable Portfolio Standard (RPS) program and Clean Energy, Jobs, and Affordability Act of 2022 set increasing requirements for renewable and zero-carbon electricity to be provided by electric utilities, as follows:
▪ 52% renewable by 2027
▪ 60% renewable by 2030
▪ 90% renewable and zero-carbon by 2035, minimum 60% renewable with remainder from other zero-carbon sources (such as large hydroelectric or green hydrogen) ▪ 95% renewable and zero-carbon by 2040, minimum 60% renewable ▪ 100% renewable and zero-carbon by 2045, minimum 60% renewable As electric consumption and the State-required percentages increase over time, Healdsburg Electric will need to procure new renewable and zero-carbon resources. The Figure 24 shows historic renewable generation from 2000-2020, as well as forecasted renewable generation based on recent averages, the contracted Grace Solar project in 2028, and the inclusion of large hydroelectric and Lodi Energy Center phased conversion to green hydrogen beginning in 2035. Figure 24 also shows 45 https://www.icf.com/insights/energy/demand-growth-challenges-opportunities-utilities 46 https://www.brattle.com/wp-content/uploads/2024/05/Electricity-Demand-Growth-and-Forecasting-in-a-Time-of-Change-1.pdf 47 Tidwell-et_al-2013ACCSWUS_Ch12.pdf
9.B.b
Packet Pg. 321 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Findings
Long-Range Community Electricity Scenarios 63
the amount of renewable and zero-carbon resources needed to meet the State requirements. The area between the bottom line and the Scenario lines represents the gap in renewable and zerocarbon resources that will need to be procured to meet the State requirements.
Figure 24 Comparison of Modeled Scenarios and Renewable and Zero-Carbon Procurement Needs. The above figure depicts the annual electricity to meet the RPS and State percentage requirements under the modeled scenarios in megawatt hours (MWh) and the currently planned procuremnt of renewable and carbon free electricity. The gap demonstrates the renewable and zero-carbon resources that will need to be procured to meet the State’s requirements under the ancitipated future conditions. Note that the chart only shows eligible renewables to 2030, and beginning in 2035 zero-carbon resources are also included.
While Healdsburg Electric has some historic carryover credits that can help meet the State’s RPS requirements, Healdsburg is still expected to cumulatively fall short of the RPS compliance by 274,978 MWh credits in the Most Likely Scenario (or 405,748 MWH in the Most Likely + Planning Margin Scenario) by 2045, if no additional renewable energy resources are procured. Healdsburg could also cumulatively fall short of the remaining zero-carbon generation needed by 87,589 to 130,828 MWh by 2045, if no additional zero-carbon energy resources are procured.
For context, to meet the 2027 requirement of 52% renewable energy, Healdsburg Electric would need an additional 6 MW of solar capacity (10,000 MWH of solar generation), or about 23 acres of solar panels. To meet the 2030 requirement of 60% renewable energy, Healdsburg Electric would need an additional 9 MW of solar capacity (16,000 MWh of solar generation) (compared to current contracts), or about 37 acres of solar panels. To meet the 2035 requirement of 90% clean energy (60% renewable plus 30% zero-carbon), Healdsburg Electric would need an additional 13 MW of solar capacity (23,000 MWh solar generation) (compared to current contracts), or about 52 acres of solar panels, and an approximately 30% increase (4,000 MWh) in average large hydroelectric
9.B.b
Packet Pg. 322 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
64 generation, in addition to an assumed conversion of 60% (11,000 MWh) of the Lodi Energy Center fuel-generated power to green hydrogen already included in the Average Current/Planned line.
Costs for new solar installations are approximately $2.5-3 million per MW, which is about $650,000- $750,000 per acre. Ground-mounted solar installations are currently the cheapest option for new renewable generation. It is also extremely important to begin pairing new solar installations with battery energy storage systems (BESS) to capture excess daytime solar generation and provide electricity 24/7/365, as well as meet ‘Resource Adequacy’ requirements. Local BESS could also help reduce forecasted peak demands and lessen or defer the need for infrastructure replacements.
Costs for BESS can vary widely; typically around $2 per Watt48.
Much like the rest of the State, Healdsburg will need to reinvest in its electric distribution system to meet the electricity needs identified in this project. This includes:
▪ Replace and/or expand transformers at Badger Substation (Order of magnitude $10-20 million) ▪ Increase wire and cable sizes to deliver more power (Order of magnitude $1-10 million) ▪ Increase local transformers (green boxes) to feed both EV chargers and new heat pump loads (Order of magnitude $10-15 million)
To lessen rate impacts, costs will need to be phased in over time. The next electric rates cost-ofservice study should take into account both increased revenue from increased electricity consumption, as well as the procurement and infrastructure costs needs outlined above.
5.4 Recommendations
While the “electrify everything” approach to reducing GHG emissions provides a clear pathway to carbon neutrality (electrification paired with renewable energy) it poses challenges to grid operators and electricity providers. While some grid improvements and expansion of energy resources will be required regardless, there are strategies which can be employed to reduce the magnitude of these investments.
Efficient Electricity Consumption
Using less electricity is a well-known concept to our communities. With building and vehicle electrification the need for efficiency has not changed. The following strategies can be promoted within the community to promote efficient electricity consumption:
▪ Solar and Storage Systems: Pairing solar with battery storage can help reduce both total electricity usage and peak demand (see below). One kW of solar PV can produce over 1,577 kWh of power each year in Healdsburg.
▪ Efficient homes: Homes which have insulation, efficient windows, and efficient appliances use less energy, especially during hot and cold weather. Improving buildings efficiency is a costeffective way to reduce electricity consumption and save on energy bills. Promoting energy efficiency through utility programs could help reduce overall demand. ▪ Drive smaller EVs for fewer miles: While EVs have much lower GHG emissions than their gas consuming counterparts over time, smaller EVs have much lower electricity demand than large EVs. As discussed above, the difference between light-duty EVs and heavy-duty EVs is more than double the total electricity demand. In addition, driving less and taking public transportation, biking, or walking is the most environmentally friendly (and low electricity use) option available. 48 https://atb.nrel.gov/electricity/2024/utility-scale_battery_storage
9.B.b
Packet Pg. 323 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Findings
Long-Range Community Electricity Scenarios 65
Keeping total EV miles low through these strategies will help lower impacts to the grid and generation resources.
Peak Demand Reduction and Load Smoothing
Electricity load smoothing, also known as load equalization or peak shaving, is the process of reducing peak electrical demand to maintain a more consistent load on the power grid. This is achieved by shifting when electricity is used or by storing energy during periods of low demand and releasing it during periods of high demand.49 By smoothing the load, utilities can prevent grid overloads, reduce the need for peaking power plants, and improve the overall efficiency and reliability of the electrical system. This practice is particularly important in systems with high variability in demand, such as those with a considerable proportion of renewable energy sources. 50 The following section provides a list of techniques for load smoothing that can reduce the peak demand on the system.
▪ Energy Storage Systems: These systems store excess energy during periods of low demand and release it during peak demand times. Examples include lithium-ion batteries and pumped hydro storage.51 As of the end of 2024, there are 75 battery storage systems in Healdsburg. However, approximately 80% of these systems are believed to be used predominantly only for back up and are not believed to be actively managed to reduce peaks. More strategic management and programming of storage systems could help reduce future peak impacts. Managed battery storage could also help prevent ‘back feeding’ excess solar generation into the transmission system as solar installations increase.
▪ Demand Response Programs: These are programs designed by the utility to help balance electricity supply and demand by encouraging customers to reduce or shift their electricity usage during peak periods. This can be achieved through time-of-use pricing, critical peak pricing, financial incentives, or direct load control.
52 Direct load control programs, such as EV
managed charging or smart thermostats, allow utilities to remotely cycle off appliances like air conditioning during peak demand in exchange for incentives. ▪ Load Shifting: Consumers of electricity can significantly impact the electricity grid by adopting load-shifting behaviors, which help smooth the load curve. The utility can adopt rate structures that incentivize consumers to shift their electricity demand away from high-cost hours to lowcost hours. Some examples of actions customers can take include:
o Building Energy: Consumers can plan to run appliances during off-peak hours when electricity demand is low (i.e., middle of the day), or pre-cool or pre-heat homes before peak demand periods. There are several load sharing devices and technologies like programmable thermostats or smart panels that can be used to control and shift loads based off the appliance energy needs.
o EV Charging Behavior: This can be through adopting behavior to charge vehicles at offpeak times (such as the middle of the day when solar production is high) or using smart charging systems to charge vehicles at off-peak hours to reduce the strain on the grid during high-demand periods. Utility rates can further incentivize people to charge 49 What is Load Equalisation in Electrical Drive? Definition & Method - Circuit Globe 50 EDF Residential Smoothing Final Report-2016-0415
51 https://www.m-hikari.com/ams/ams-2013/ams-77-80-2013/karimAMS77-80-2013.pdf 52 https://blogs.edf.org/energyexchange/wp-content/blogs.dir/38/files/2017/10/EDF-Residential-Smoothing-Final-Report-2016-0506.pdf
9.B.b
Packet Pg. 324 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) City of Healdsburg
Healdsburg Energy and Demand Forecasting
66 during these hours. While there is less flexibility when commercial vehicles are charged, the use of smart technology and distributed charging for fleets can reduce the strain on the electrical grid as well.
▪ Charging Station Locations: Spreading the load of EV charging across multiple locations and times optimizes grid efficiency and reliability. For example, increasing the number of workplace chargers will increase the number of EVs charged during midday when demand is lower and solar production is high. With only home charging the potential for EVs to all begin charging at 6 pm, further exacerbating peak demands, is high.
▪ Smart Grid Technologies: Smart grids use advanced communication and control technologies to optimize the distribution and consumption of electricity. This includes real-time monitoring and automated adjustments to balance supply and demand.53
▪ Distributed Energy Resources (DERs): Integrating renewable energy sources like solar panels and wind turbines, along with local energy storage, can help smooth the load by providing additional power during peak times and storing excess energy when demand is low.52 53 https://www.saarcenergy.org/wp-content/uploads/2018/05/Load-Forecasting-Methods-and-Techniques-by-Dr.-ChandrasekharReddy-Atla-Dr.-Chandras.pdf
9.B.b
Packet Pg. 325 Attachment: Healdsburg Energy and Demand Forecasting Report (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Appendix A
Model Inputs by Scenario
9.B.c
Packet Pg. 326 Attachment: Appendix A Model Inputs by Scenario (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Underachieve
Category Variable 2025 2030 2035 2040 2045
Residential Solar # Solar Arrays (kW capacity added) 151 906 1,661 2,416 3,171 Residential - SF # New Builds 13 47 112 159 206
# replaced water heater 12 71 118 165 212
# high efficency HVAC - - - - -
# standard efficiency HVAC 19 115 192 268 345
# replaced stove 2 9 16 22 28
# dryers replaced 1 7 12 17 22
Residential - MF # New Builds 109 381 879 1,015 1,830
# replaced water heater 5 28 46 65 84
# high efficency HVAC - - - - -
# standard efficiency HVAC 2 13 21 30 38
# replaced stove 1 3 5 7 10
# dryers replaced 0 1 1 1 2
Commercial Solar # Solar Arrays (1kW) 167 1,004 1,841 2,677 3,514 Commercial - Office Square Footage Added 5,672 11,344 22,689 28,361 39,705 Commercial - Retail Square Footage Added 7,888 15,775 31,551 39,438 55,213 Commercial -Warehouse Square Footage Added 14,441 57,765 86,647 129,971 173,295 Commercial -Restaurant Square Footage Added - 2,884 2,884 5,768 5,768 Commercial - Hotel Square Footage Added 19,229 57,687 96,145 134,603 192,289 Commercial -Other Square Footage Added 30,243 100,810 161,296 231,863 302,430 Commercial - Office # replaced RTU 2 8 14 19 26
Commercial - Retail # replaced RTU 1 2 5 6 8
Commercial -Warehouse # replaced RTU 1 5 7 11 14
Commercial -Restaurant # replaced RTU 0 1 2 3 3
Commercial -Other # replaced RTU 3 12 20 28 37
Commercial - Office # replaced Gas RTU 2 7 13 18 23
Commercial - Retail # replaced Gas RTU 1 2 5 6 8
Commercial -Warehouse # replaced Gas RTU 1 3 5 7 10
Commercial -Restaurant # replaced Gas RTU 0 1 1 2 2
Commercial - Hotel # replaced Gas RTU 0 1 1 2 2
Commercial -Other # replaced Gas RTU 3 9 15 22 29
Commercial - Office # replaced Electric RTU 0 1 1 2 2
Commercial - Retail # replaced Electric RTU 0 0 0 0 0
Commercial -Warehouse # replaced Electric RTU 0 1 2 3 4 Commercial -Restaurant # replaced Electric RTU 0 0 0 1 1 Commercial - Hotel # replaced Electric RTU 1 3 4 6 9
Commercial -Other # replaced Electric RTU 1 3 4 6 8
Commercial - Office # replaced boiler 1 1 2 3 4
Commercial - Retail # replaced boiler 1 2 3 4 5
Commercial -Warehouse # replaced boiler 1 2 3 5 6
Commercial -Restaurant # replaced boiler 0 1 1 1 1
Commercial - Hotel # replaced boiler 1 2 3 4 6
Commercial -Other # replaced boiler 2 6 9 13 17
Commercial -Restaurant # replaced kitchen equipment 0 1 1 2 2 ZEVs 1,000 2,500 4,500 7,500 13,500
Notes
1. Non-residential commerical equipment values includes number of "new" commercial buidling equipment assumed to be electric (100% of HVAC, 50% of boiler and 50% of kitchen)
2. Grayed out values for RTUs provide information on the assumed split of RTUs that replace gas vs electric resistance RTUs when the total # of replcaed RTUs is input into the Model. This is based on the assumed ComStock end-use of RTUs by fuel type.
3. ComStock data set indicated limited electricity data and savings curves for hotel RTU replacement indicating hotel RTUs are limited. Therefore no hotel RTU replacements modeled.
9.B.c
Packet Pg. 327 Attachment: Appendix A Model Inputs by Scenario (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Most Likely
Category Variable 2025 2030 2035 2040 2045
Residential Solar # Solar Arrays (kW capacity added) 151 906 1,661 2,416 3,171 Residential - SF # New Builds 15 53 126 179 232
# replaced water heater 24 141 376 612 847
# high efficency HVAC - - - - -
# standard efficiency HVAC 38 230 613 996 1,379
# replaced stove 3 19 50 81 112
# dryers replaced 2 14 38 62 86
Residential - MF # New Builds 122 428 989 1,142 2,059
# replaced water heater 9 56 149 242 335
# high efficency HVAC - - - - -
# standard efficiency HVAC 4 26 68 111 154
# replaced stove 1 6 17 28 38
# dryers replaced 0 1 3 5 7
Commercial Solar # Solar Arrays (1kW) 167 1,004 1,841 2,677 3,514 Commercial - Office Square Footage Added 5,672 11,344 22,689 28,361 39,705 Commercial - Retail Square Footage Added 7,888 15,775 31,551 39,438 55,213 Commercial -Warehouse Square Footage Added 14,441 57,765 86,647 129,971 173,295 Commercial -Restaurant Square Footage Added - 2,884 2,884 5,768 5,768 Commercial - Hotel Square Footage Added 19,229 57,687 96,145 134,603 192,289 Commercial -Other Square Footage Added 30,243 100,810 161,296 231,863 302,430 Commercial - Office # replaced RTU 3 11 19 26 35
Commercial - Retail # replaced RTU 1 3 8 11 16
Commercial -Warehouse # replaced RTU 1 6 12 20 28
Commercial -Restaurant # replaced RTU 0 2 4 7 9
Commercial -Other # replaced RTU 4 15 34 55 75
Commercial - Office # replaced Gas RTU 2 10 18 24 32
Commercial - Retail # replaced Gas RTU 1 3 7 11 15
Commercial -Warehouse # replaced Gas RTU 1 4 9 14 19
Commercial -Restaurant # replaced Gas RTU 0 1 3 5 7
Commercial - Hotel # replaced Gas RTU 0 1 2 2 3
Commercial -Other # replaced Gas RTU 3 12 27 43 59
Commercial - Office # replaced Electric RTU 0 1 2 2 3
Commercial - Retail # replaced Electric RTU 0 0 0 0 0
Commercial -Warehouse # replaced Electric RTU 0 2 4 6 9 Commercial -Restaurant # replaced Electric RTU 0 0 1 1 2 Commercial - Hotel # replaced Electric RTU 1 3 6 9 13
Commercial -Other # replaced Electric RTU 1 3 7 12 16
Commercial - Office # replaced boiler 1 1 3 5 7
Commercial - Retail # replaced boiler 1 2 7 11 16
Commercial -Warehouse # replaced boiler 1 2 4 6 9
Commercial -Restaurant # replaced boiler 0 1 1 1 1
Commercial - Hotel # replaced boiler 1 2 4 6 9
Commercial -Other # replaced boiler 2 6 13 21 28
Commercial -Restaurant # replaced kitchen equipment 0 1 3 4 6 ZEVs 2,000 7,500 11,000 14,500 17,500
Notes
1. Non-residential commerical equipment values includes number of "new" commercial buidling equipment assumed to be electric (100% of HVAC, 50% of boiler and 50% of kitchen)
2. Grayed out values for RTUs provide information on the assumed split of RTUs that replace gas vs electric resistance RTUs when the total # of replcaed RTUs is input into the Model. This is based on the assumed ComStock end-use of RTUs by fuel type.
3. ComStock data set indicated limited electricity data and savings curves for hotel RTU replacement indicating hotel RTUs are limited. Therefore no hotel RTU replacements modeled.
9.B.c
Packet Pg. 328 Attachment: Appendix A Model Inputs by Scenario (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Achieve
Category Variable 2025 2030 2035 2040 2045
Residential Solar # Solar Arrays (kW capacity added) 151 906 1,661 2,416 3,171 Residential - SF # New Builds 16 56 133 189 245
# replaced water heater 19 113 193 273 353
# high efficency HVAC - - - - -
# standard efficiency HVAC 31 184 314 444 575
# replaced stove 2 15 26 36 47
# dryers replaced 2 11 20 28 36
Residential - MF # New Builds 129 452 1,044 1,206 2,173 # replaced water heater 7 45 76 108 139
# high efficency HVAC - - - - -
# standard efficiency HVAC 3 21 35 50 64
# replaced stove 1 5 9 12 16
# dryers replaced 0 1 2 2 3
Commercial Solar # Solar Arrays (1kW) 167 1,004 1,841 2,677 3,514 Commercial - Office Square Footage Added 5,672 11,344 22,689 28,361 39,705 Commercial - Retail Square Footage Added 7,888 15,775 31,551 39,438 55,213 Commercial -Warehouse Square Footage Added 14,441 57,765 86,647 129,971 173,295 Commercial -Restaurant Square Footage Added - 2,884 2,884 5,768 5,768 Commercial - Hotel Square Footage Added 19,229 57,687 96,145 134,603 192,289 Commercial -Other Square Footage Added 30,243 100,810 161,296 231,863 302,430 Commercial - Office # replaced RTU 3 11 19 25 33
Commercial - Retail # replaced RTU 1 3 6 7 10
Commercial -Warehouse # replaced RTU 1 6 9 13 18
Commercial -Restaurant # replaced RTU 0 2 2 4 4
Commercial -Other # replaced RTU 4 15 25 36 47
Commercial - Office # replaced Gas RTU 2 10 17 23 30
Commercial - Retail # replaced Gas RTU 1 3 6 7 10
Commercial -Warehouse # replaced Gas RTU 1 4 6 9 12
Commercial -Restaurant # replaced Gas RTU 0 1 2 3 3
Commercial - Hotel # replaced Gas RTU 0 1 1 2 3
Commercial -Other # replaced Gas RTU 3 12 20 28 36
Commercial - Office # replaced Electric RTU 0 1 2 2 3
Commercial - Retail # replaced Electric RTU 0 0 0 0 0
Commercial -Warehouse # replaced Electric RTU 0 2 3 4 6 Commercial -Restaurant # replaced Electric RTU 0 0 1 1 1 Commercial - Hotel # replaced Electric RTU 1 3 5 7 10
Commercial -Other # replaced Electric RTU 1 3 5 8 10
Commercial - Office # replaced boiler 1 1 3 4 5
Commercial - Retail # replaced boiler 1 2 4 6 8
Commercial -Warehouse # replaced boiler 1 2 4 5 7
Commercial -Restaurant # replaced boiler 0 1 1 1 1
Commercial - Hotel # replaced boiler 1 2 3 5 6
Commercial -Other # replaced boiler 2 6 11 15 20
Commercial -Restaurant # replaced kitchen equipment 0 1 1 2 3 ZEVs 2,000 7,000 12,000 16,500 21,500
Notes
1. Non-residential commerical equipment values includes number of "new" commercial buidling equipment assumed to be electric (100% of HVAC, 50% of boiler and 50% of kitchen)
2. Grayed out values for RTUs provide information on the assumed split of RTUs that replace gas vs electric resistance RTUs when the total # of replcaed RTUs is input into the Model. This is based on the assumed ComStock end-use of RTUs by fuel type.
3. ComStock data set indicated limited electricity data and savings curves for hotel RTU replacement indicating hotel RTUs are limited. Therefore no hotel RTU replacements modeled.
9.B.c
Packet Pg. 329 Attachment: Appendix A Model Inputs by Scenario (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Overachieve
Category Variable 2025 2030 2035 2040 2045
Residential Solar # Solar Arrays (kW capacity added) 151 906 2,416 2,416 3,171 Residential - SF # New Builds 17 59 140 199 257
# replaced water heater 47 282 1,324 2,365 3,407
# high efficency HVAC - - - - -
# standard efficiency HVAC 77 460 1,330 2,200 3,070
# replaced stove 6 37 839 1,640 2,441
# dryers replaced 5 29 644 1,258 1,873
Residential - MF # New Builds 136 476 1,099 1,269 2,288 # replaced water heater 19 112 271 430 589
# high efficency HVAC - - - - -
# standard efficiency HVAC 9 51 186 320 455
# replaced stove 2 13 118 224 330
# dryers replaced 0 2 32 62 92
Commercial Solar # Solar Arrays (1kW) 167 1,004 1,841 2,677 3,514 Commercial - Office Square Footage Added 5,672 11,344 22,689 28,361 39,705 Commercial - Retail Square Footage Added 7,888 15,775 31,551 39,438 55,213 Commercial -Warehouse Square Footage Added 14,441 57,765 86,647 129,971 173,295 Commercial -Restaurant Square Footage Added - 2,884 2,884 5,768 5,768 Commercial - Hotel Square Footage Added 19,229 57,687 96,145 134,603 192,289 Commercial -Other Square Footage Added 30,243 100,810 161,296 231,863 302,430 Commercial - Office # replaced RTU 3 11 31 49 68
Commercial - Retail # replaced RTU 2 5 12 19 26
Commercial -Warehouse # replaced RTU 2 9 21 34 47
Commercial -Restaurant # replaced RTU 0 3 7 13 17
Commercial -Other # replaced RTU 6 25 60 95 131
Commercial - Office # replaced Gas RTU 2 10 28 45 63
Commercial - Retail # replaced Gas RTU 1 5 12 18 25
Commercial -Warehouse # replaced Gas RTU 1 6 15 24 33
Commercial -Restaurant # replaced Gas RTU 0 3 6 10 13
Commercial - Hotel # replaced Gas RTU 0 1 2 3 5
Commercial -Other # replaced Gas RTU 4 20 47 75 102
Commercial - Office # replaced Electric RTU 0 1 2 4 6
Commercial - Retail # replaced Electric RTU 0 0 0 1 1
Commercial -Warehouse # replaced Electric RTU 1 3 7 11 15 Commercial -Restaurant # replaced Electric RTU 0 1 2 3 4 Commercial - Hotel # replaced Electric RTU 1 4 9 13 18
Commercial -Other # replaced Electric RTU 1 5 13 21 28
Commercial - Office # replaced boiler 1 2 5 8 12
Commercial - Retail # replaced boiler 1 5 14 22 31
Commercial -Warehouse # replaced boiler 1 3 6 9 12
Commercial -Restaurant # replaced boiler 1 2 2 2 2
Commercial - Hotel # replaced boiler 1 3 6 9 13
Commercial -Other # replaced boiler 2 9 21 32 44
Commercial -Restaurant # replaced kitchen equipment 0 2 5 9 12 ZEVs 2,500 10,500 15,000 19,500 24,000
Notes
1. Non-residential commerical equipment values includes number of "new" commercial buidling equipment assumed to be electric (100% of HVAC, 50% of boiler and 50% of kitchen)
2. Grayed out values for RTUs provide information on the assumed split of RTUs that replace gas vs electric resistance RTUs when the total # of replcaed RTUs is input into the Model. This is based on the assumed ComStock end-use of RTUs by fuel type.
3. ComStock data set indicated limited electricity data and savings curves for hotel RTU replacement indicating hotel RTUs are limited. Therefore no hotel RTU replacements modeled.
9.B.c
Packet Pg. 330 Attachment: Appendix A Model Inputs by Scenario (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Appendix
B
SupportingDatafor ScenarioDevelopment
9.B.d
Packet Pg. 331 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Customer Count Forecast
Current (2023) Average Building Sq Footage Annual Compound Growth 2025 2030 2035 2040 2045 Current (2023) Electric Accounts Commerical (ALL - based on Number of Buildings) 581 9348.746811 0.5% 587 602 617 632 647 1,092 Office 125 5672.173469 0.2% 126 127 129 130 132
Retail 58 7887.634615 0.5% 59 60 62 63 65
Warehouse 61 14441.22222 0.9% 62 65 67 70 73
Restaurant 18 2883.75 0.6% 18 19 19 20 20
Hotel 25 19228.94737 1.8% 26 28 30 32 35
Other 165 10081 0.8% 168 175 181 188 195
Excluded 129 5246.5 0.0% 129 129 129 129 129
Residential Customers (ALL - based on Number of Units) 4918 5071 5453 6157 6386 7463 Single-Family 4033 4050 4092 4173 4232 4290 3,783
Multi-Family 885 1021 1361 1984 2154 3173 1,220
Manufactured N/A
New Home Starts (compared to 2023 baseline)
2025 2030 2035 2040 2045
Residential Homes 153 535 1239 1468 2545
Single-Family 17 59 140 199 257
Multi-Family 136 476 1099 1269 2288
Manufactured N/A N/A N/A N/A N/A
New Commercial Buildings (compared to 2023 baseline)
2025 2030 2035 2040 2045 2025 2030 2035 2040 2045
Commerical (ALL - based on Number of Buildings) 196,324 336,555 476,786 617,017 6 21 36 51 66 56,092 Office 11,344 22,689 28,361 39,705 Office 1 2 4 5 7 5,672 Retail 15,775 31,551 39,438 55,213 Retail 1 2 4 5 7 7,888 Warehouse 57,765 86,647 129,971 173,295 Warehouse 1 4 6 9 12 14,441 Restaurant 2,884 2,884 5,768 5,768 Restaurant 0 1 1 2 2 - Hotel 57,687 96,145 134,603 192,289 Hotel 1 3 5 7 10 19,229 Other 100,810 161,296 231,863 302,430 Other 3 10 16 23 30 30,243 Excluded 0 0 0 0 0 - - - - -
New Electric Equipment Counts in Commercial (compared with 2023 baseline) 2025 2030 2035 2040 2045
Office 1 2 4 5 7
Retail 1 2 4 5 7
Warehouse 1 4 6 9 12
Restaurant 0 1 1 2 2
Hotel 1 3 5 7 10
Other 3 10 16 23 30
2025 2030 2035 2040 2045
Office 1 43 1 2
Retail 1 43 1 2
Warehouse 1 65 2 3
Restaurant 0 11 1 1
Hotel 1 2 3 4 5
Other 2 5 8 12 15
2025 2030 2035 2040 2045
Restaurant 0 1 1 1 1
Kitchen Count
Building Count Square Footage
RTU Count
Boiler Count
New Building Forecast Data
For new buildings assume the following electrifcation: 100% HVAC, 50% water heaters and 50% commercial kitchens.
9.B.d
Packet Pg. 332 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Residential End-Use Assessment using ResStock
Heating Fuel Type
Residential Market Rate
(baseline) ACType
Residential Market Rate
(baseline) Dryer Fuel Type
Residential Market Rate
(baseline)
Electric 21% Central 54% Electric 44%
Electric Heat Pumps 5% Ducted Heat Pump 4% Natural Gas 38% Natural Gas 69% Mini Split 1% Propane 2%
Propane 6% None 26%
Other 4% Room AC 14% Dryer Fuel Type
Single-Family Market Rate
(baseline)
Electric 47%
Heating Fuel Type
Single-Family Market
Rate (baseline) AC Type
Single-Family Market Rate
(baseline) Natural Gas 45%
Electric 16% Central 58% Propane 2%
Electric Heat Pumps 5% Ducted Heat Pump 5%
Natural Gas 71% Mini Split 1% Dryer Fuel Type
Multi-Family Market Rate
(baseline)
Propane 7% None 25% Electric 30%
Other 5% Room AC 12% Natural Gas 9%
Propane 2%
Heating Fuel Type
Multi-Family Market
Rate (baseline) AC Type
Multi-Family Market Rate
(baseline)
Electric 41% Central 38%
Electric Heat Pumps 5% Ducted Heat Pump 2%
Natural Gas 58% Mini Split 3%
Propane 1% None 34%
None 1% Room AC 23%
Water Heating Fuel Type
Residential Market Rate
(baseline) Cooking Fuel Type
Residential Market Rate
(baseline)
Electric 18% Electric 42%
Electric Heat Pumps 0% Natural Gas 54%
Natural Gas 74% Propane 4%
Propane 7%
Other 0.2% Cooking Fuel Type
Single-Family Market Rate
(baseline)
Electric 37%
Water Heating Fuel Type
Single-Family Market
Rate (baseline) Natural Gas 58%
Electric 14% Propane 4%
Electric Heat Pumps 0%
Natural Gas 76% Cooking Fuel Type
Multi-Family Market Rate
(baseline)
Propane 9% Electric 61%
Other 0.3% Natural Gas 38%
Propane 2%
Water Heating Fuel Type
Multi-Family Market
Rate (baseline)
Electric 32%
Electric Heat Pumps 0%
Natural Gas 68%
Propane 0%
Other 0.0%
9.B.d
Packet Pg. 333 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Healdsburg Residential Customers (2023) 4918
HVAC
Heating Fuel Type
Residential Market Rate
(baseline - 2018)
Estimated
Number in
Healdsburg TECH Projects Healdsburg Rebates
New Healdsburg
Numbers New % Distribution % Change
Annual
Compound
Growth Rate
(CAGR)
Electric 21% 1048 1123 23% 1.5% 1.153%
Electric Heat Pumps 5% 265 10.64250963 64 340 7% 1.5% 4.224% Natural Gas/Other Fuel 79% 3864 3790 77% -1.5% -0.325%
Water Heating
Water Heating Fuel Type
Residential Market Rate
(baseline - 2018)
Estimated
Number in
Healdsburg TECH Projects Healdsburg Rebates
New Healdsburg
Numbers New % Distribution % Change
Annual
Compound
Growth Rate
(CAGR)
Electric 18% 887 898 18% 0.2% 0.208%
Heat Pump Water Heaters 0% 0 1 10 11 0% 0.2%
Natural Gas/ Other Fuel 82% 4031 4020 82% -0.2% -0.046% Cooking
Cooking Fuel Type
Residential Market Rate
(baseline - 2018)
Estimated
Number in
Healdsburg TECH Projects Healdsburg Rebates
New Healdsburg
Numbers New % Distribution % Change
Annual
Compound
Growth Rate
(CAGR)
Electric 42% 2073 20 2093 43% 0.4% 0.160%
Natural Gas/ Other Fuel 58% 2845 2825 57% -0.4% -0.118% Dryer
Cooking Fuel Type
Residential Market Rate
(baseline - 2018)
Estimated
Number in
Healdsburg TECH Projects Healdsburg Rebates
New Healdsburg
Numbers New % Distribution % Change
Annual
Compound
Growth Rate
(CAGR)
Electric 44% 2160 31 2191 45% 0.2%
Estimated using
hot water heater
trends
Natural Gas/ Other Fuel 40% 1981 1950 40% -0.2% -0.046% Residential
End-use Baseline
Distribution By
Fuel Type
Recent Adoption
Rate (2021-2024)
Adjusted Adoption
Rate
Adjusted Current
Distribution
Adjusted Current
Distribution
Electric Space Heating 21% 23% 1.5% 7.6%
Heat Pump 5% 7% 1.5% 7.6% 14.5% 12.98%
Electric Water Heating 18% 18% 0.2% 1.1%
HPWH 0% 0.2% 0.2% 1.1% 1.4% 1.1%
Electric Cooking 42% 43% 0.4% 2.0% 44.6% 44.2%
Electric Dryer 44% 45% 0.4% 2.0% 46.6% 45.9%
*Based on Resstock for
Sonoma County + the recent
projects/fuel switch known
from rebates numbers from
Healdsburg and TECH data
*Based on data
of project
implementation
(Healdsburg
Rebates + TECH
Projects)
*Based on % of
projects that don’t
apply for permit or
rebates - current
calcs assume 20%
of these projects
are permitted
Current Residential Equipment Values
9.B.d
Packet Pg. 334 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Non-Residential Building Calculation of Equipment Replacements Includes gas and
electric RTUs
Full
Electrification
by 2045
Building Type Current RTUs Gas RTUs Electric RTUs
Ratio Gas to
Total % RTUs available
for Replacement
Goal Distribution
by 2030
Goal Values
by 2030
Goal
Replacements
by 2030 CAGR by 2030
Goal Distribution
by 2030
Goal Values
by 2030
Goal
Replacements
by 2030 CAGR by 2030
Goal
Distribution by
2045
Goal Values
by 2045
Goal
Replacements by
2045 CAGR by 2045
Goal Distribution
by 2030
Goal Values
by 2030
Goal
Replacements
by 2030 CAGR by 2030
Goal
Distribution by
2030
Goal Values by
2030
Goal
Replacements by
2030
CAGR by
2030
Max
Replacement
Small Office 61 56 5 0.92 49% 44% 55 6 -1.7% 42% 52 9 -2.6% 27% 34 28 -2.8% 42% 52 9 -2.6% 42% 52 9 -2.7% 61 Retail 19 19 1 0.97 33% 32% 19 0 -0.3% 31% 18 1 -0.9% 18% 11 9 -2.8% 31% 18 1 -0.9% 28% 16 3 -2.7% 19 Warehouse 35 24 11 0.69 58% 57% 35 1 -0.3% 55% 34 2 -0.9% 32% 19 16 -2.8% 55% 34 2 -0.9% 49% 30 5 -2.7% 35 Restaurant 15 12 3 0.78 82% 80% 14 0 -0.3% 78% 14 1 -0.9% 45% 8 7 -2.8% 78% 14 1 -0.9% 70% 13 2 -2.7% 15 Small Hotel 13 3 11 0.21 53% 52% 13 0 -0.3% 50% 13 1 -0.9% 29% 7 6 -2.8% 50% 13 1 -0.9% 45% 11 2 -2.7% 13 Other 101 79 22 0.78 61% 60% 99 2 -0.3% 58% 96 5 -0.9% 34% 55 45 -2.8% 58% 96 5 -0.9% 52% 86 15 -2.7% 101 Underachieve CMS Implementation - Decarb 2% of Existing Nonres by 2030; replacement trends continues through 2045
Overachieve CMS Implementation - Decarb 15% of Existing Nonres by 2030
Achieve CMS Implementation - Decarb 5% of Existing Nonres by Most Likely - Decarb 5% of Existing Nonres by 2030, 45% by 2045 2030; replacement trends continues through 2045 Full
Electrification by
2045
Building Type
Current Gas
Boiler
% Current Gas
Boiler
Goal
Distribution by
2030
Goal Values
by 2030
Goal
Replacements by
2030 CAGR by 2030
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements by
2030 CAGR by 2030
Goal
Distribution
by 2045
Goal Values by
2045
Goal
Replacements by
2045 CAGR by 2045
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements by
2030 CAGR by 2030
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements
by 2030 CAGR by 2030
Max
Replacement
Small Office 8 6% 6% 8 0 -0.3% 6% 8 0 -0.9% 4% 4 4 -2.8% 6% 8 0 -0.9% 5% 7 1 -2.7% 8 Retail 27 47% 46% 26 1 -0.3% 44% 26 1 -0.9% 26% 15 12 -2.8% 44% 26 1 -0.9% 40% 23 4 -2.7% 27 Warehouse 6 10% 10% 6 0 -0.3% 9% 6 0 -0.9% 5% 3 3 -2.8% 9% 6 0 -0.9% 8% 5 1 -2.7% 6 Restaurant 1 6% 5% 1 0 -0.3% 5% 1 0 -0.9% 3% 1 0 -2.8% 5% 1 0 -0.9% 0% 0 1 -100.0% 1 Small Hotel 8 32% 31% 8 0 -0.3% 30% 8 0 -0.9% 18% 4 4 -2.8% 30% 8 0 -0.9% 27% 7 1 -2.7% 8 Other 29 18% 17% 28 1 -0.3% 17% 28 1 -0.9% 10% 16 13 -2.8% 17% 28 1 -0.9% 15% 25 4 -2.7% 29 Full
Electrification by
2045
Building Type
Current Gas
Cooking
% Current Gas
Cooking
Goal
Distribution by
2030
Goal Values
by 2030
Goal
Replacements by
2030 CAGR by 2030
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements by
2030 CAGR by 2030
Goal
Distribution
by 2045
Goal Values by
2045
Goal
Replacements by
2045 CAGR by 2045
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements by
2030 CAGR by 2030
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements
by 2030 CAGR by 2030
Max
Replacement
Restaurant 11 61% 60% 11 0 -0.3% 58% 10 1 -0.9% 34% 6 5 -2.8% 58% 10 1 -0.9% 52% 9 2 -2.7% 11 High CMS Implementation - Decarb 15% of Existing Nonres by 2030
Underachieve CMS Implementation - Decarb 2% of Existing Nonres by 2030; replacement trends continues through 2045
Moderate CMS Implementation - Decarb 5% of Existing Nonres by 2030; replacement trends continues through 2045
High CMS Implementation - Decarb 15% of Existing Nonres by Most Likely - Decarb 5% of Existing Nonres by 2030, 45% by 2045 2030 Most Likely - Decarb 5% of Existing Nonres by 2030, 45% by 2045 Underachieve CMS Implementation - Decarb 2% of Existing Nonres by 2030; replacement trends continues through 2045
Moderate CMS Implementation - Decarb 5% of Existing Nonres by 2030;; replacement trends continues through 2045
Residential Building Calculation of Equipment Replacements 4918 Full Electrification by 2045
Residential End-Use Using Fossil-fuel
% Fossil Fuel Distribution in
2018
% Change btwn
2018 & 2024
Adjusted %
Change btwn
2018 & 2024
% Distribution in
2024 2024 values
Goal Distribution by
2030
Goal Values by
2030
Goal
Replacements
by 2030
Goal Distribution
by 2045
Goal Values by
2045
Goal
Replacements
by 2045
Goal
Distribution
by 2030
Goal Values by
2030
Goal
Replacements
by 2030
Goal
Distribution by
2045
Goal
Values by
2045
Goal
Replacements
by 2045
Goal
Distribution
by 2030
Goal
Values by
2030
Goal
Replacements
by 2030
Goal
Distribution by
2045
Goal Values
by 2045
Goal
Replacements
by 2045
Goal
Distribution by
2030
Goal Values by
2030
Goal
Replacements
by 2030 CAGR by 2030 Max Replacement
Single-Family 4033
Water Heating 86% -0.2% -1.1% 84.5% 3407 83% 3336 71 79% 3195 212 81% 3266 141 63% 2560 847 82% 3294 113 76% 3054 353 77% 3125 282 -1.4% 3407 HVAC 84% -1.5% -7.6% 76.1% 3070 73% 2955 115 68% 2725 345 70% 2840 230 42% 1690 1379 72% 2886 184 62% 2495 575 65% 2610 460 -2.7% 3070 Cooking 63% -0.4% -2.0% 60.5% 2441 60% 2431 9 60% 2413 28 60% 2422 19 58% 2329 112 60% 2426 15 59% 2394 47 60% 2403 37 -0.3% 2441 Dryer 48% -0.2% -1.1% 46.4% 1873 46% 1866 7 46% 1852 22 46% 1859 14 44% 1787 86 46% 1862 11 46% 1837 36 46% 1844 29 -0.3% 1873 Multi-Family 885 -100.0%
Water Heating 68% -0.2% -1.1% 66.5% 589 63% 561 28 57% 505 84 60% 533 56 29% 254 335 61% 544 45 51% 449 139 54% 477 112 -3.4% 589 HVAC 59% -1.5% -7.6% 51.4% 455 50% 442 13 47% 416 38 48% 429 26 34% 301 154 49% 434 21 44% 390 64 46% 403 51 -2.0% 455 Cooking 39% -0.4% -2.0% 37.3% 330 37% 327 3 36% 320 10 37% 323 6 33% 292 38 37% 325 5 35% 314 16 36% 317 13 -0.7% 330 Dryer 12% -0.2% -1.1% 10.4% 92 10% 92 1 10% 91 2 10% 91 1 10% 85 7 10% 91 1 10% 89 3 10% 90 2 -0.4% 92 Overachieve CMS Implementation - Decarb 20% of Existing Underachieve CMS Implementation - Decarb 5% of Existing Residential by 2030; 15% by 2045 Most Likely Scenario - Decarb 10% of Existing Residential by 2030; 60% by 2045 Achieve CMS Implementation - Decarb 8% of Existing Residential by 2030; 25% by 2045 Residential by 2030
9.B.d
Packet Pg. 335 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Source
Total registered vehicles in Healdsburg (2024) 20,357 https://data.ca.gov/dataset/vehicle-fuel-type-count-by-zip-code Light Duty 18,510 *includes heavy duty and unknown
Heavy Duty 1,847
% Passenger 91%
% Commercial 9%
2024 Population 11,137 U.S. Census Bureau QuickFacts: Healdsburg city, California Cars per capita 2
Registered EVs in Healdsburg (2024) 928 https://data.ca.gov/dataset/vehicle-fuel-type-count-by-zip-code Passenger ZEV 924
Commercial ZEV 4
% Plug in Evs 4.6%
% Plug in Passenger ZEV 5.0%
% Plug in Commercial ZEV 0.2%
EMFAC EPM (kWh/mile) 2025 2030 2035 2040 2045
Passenger 0.36 0.37 0.39 0.40 0.41
Commercial 1.41 1.37 1.36 1.35 1.35
Forecasted Total VMT (CMS) 134,170,813 143,346,234 152,521,655 161,697,077 177,948,622 Forecasted Passenger VMT (CMS) 129,509,112 138,181,316 146,748,605 155,227,390 170,353,381 Forecasted Commercial VMT (CMS) 4,661,701 5,164,918 5,773,051 6,469,687 7,595,241 Baseline EV adoption from EMFAC 2025 2030 2035 2040 2045 Forecasted population 12,746 12,882 13,018 13,127 12,025 Forecasted Total Cars 23,297.55 23,546.29 795.03 21,979.36 23,993.57 23, Forecasted Passenger 21,183.75 21,409.92 21,636.10 19,985.16 21,816.62 Forecasted Miles/Passenger Vehicle Annual 6,522.99 6,854.23 7,174.46 6,480.26 7,808.42 Forecasted Miles/Passenger Vehicle Daily 17.87 18.78 19.66 21.39 17.75 Passenger EV (%) 5.19% 7.79% 9.93% 11.26% 11.98%
BAU Passenger ZEVs 1,141 1,815 2,337 2,680 2,875
Forecasted Commercial 1994.20 2113.80 2136.37 2158.93 2176.95 Forecasted Miles / Commercial Vehicle Annual 2337.63 2443.43 2702.28 2996.70 3488.94 Forecasted Miles / Commercial Vehicle Daily 6.40 6.69 7.40 8.21 9.56 Commercial EV (%) 0.68% 7.10% 19.18% 29.45% 36.48%
BAU Commercial ZEVs 14 150 410 636 794
Total ZEVs 1,155 1,966 2,747 3,316 3,669
CMS ZEV VMT 7,424,944 12,208,915 17,126,951 21,135,079 25,220,903 CMS ZEV Passenger VMT 7,393,045 11,841,977 16,019,927 19,229,539 22,450,076 CMS ZEV Commercial VMT 31,898 366,938 1,107,024 1,905,541 2,770,827 GWh per year using Model split (80% sedan, 20% heavy duty) 4 7 10 13 15 Underachieve CMS Implementation - 5% passenger ZEV penetration & 10% commercial ZEV penetration by 2030 2025 2030 2035 2040 2045 Percentage of passenger vehicles that are electric (%) 5.8% 10.0% 17.8% 31.8% 56.6% # of passenger ZEVs 1,164 2,117 3,814 6,873 12,356
Percentage of commercial vehicles that are electric (%) 1.9% 10.2% 23.5% 36.7% 50.0% # of commercial ZEVs 38 216 502 793 1,088
Total # of ZEVs 1,202 2,333 4,316 7,666 13,445
CMS ZEV VMT 7,631,994 14,334,611 27,499,491 51,685,210 100,281,462 CMS ZEV Passenger VMT 7,544,203 13,806,934 26,144,110 49,308,321 96,483,841 CMS ZEV Commercial VMT 87,791 527,677 1,355,380 2,376,889 3,797,621 GWh per year 3 6 12 23 45
Most Likely CMS Implementation - 15% passenger ZEV penetration & 20% commercial ZEV penetration by 2030 2025 2030 2035 2040 2045 Percentage of passenger vehicles that are electric (%) 10.0% 35.0% 48.3% 61.7% 75.0% # of passenger ZEVs 1,997 7,413 10,347 13,342 16,362
Percentage of commercial vehicles that are electric (%) 1.9% 10.2% 26.8% 43.4% 60.0% # of commercial ZEVs 38 216 573 937 1,306
Total # of ZEVs 2,034 7,629 10,920 14,279 17,669
CMS ZEV VMT 13,028,207 48,879,940 72,468,379 98,527,565 132,322,180 CMS ZEV Passenger VMT 12,940,416 48,352,263 70,920,564 95,719,364 127,765,036 CMS ZEV Commercial VMT 87,791 527,677 1,547,815 2,808,201 4,557,145 GWh per year 5 19 30 42 59
Achieve CMS Implementation - 30% passenger ZEV penetration & 40% commercial ZEV penetration 2025 2030 2035 2045 2040 Percentage of passenger vehicles that are electric (%) 9.2% 30.0% 50.0% 70.0% 90.0% # of passenger ZEVs 1,830 6,353 10,704 15,145 19,635
Percentage of commercial vehicles that are electric (%) 6.9% 40.2% 56.8% 73.4% 90.0% # of commercial ZEVs 137 850 1,214 1,585 1,959
Total # of ZEVs 1,968 7,204 11,917 16,729 21,594
CMS ZEV VMT 12,182,049 43,520,350 76,646,105 113,404,087 160,153,760 CMS ZEV Passenger VMT 11,861,174 41,443,197 73,366,374 108,654,980 153,318,043 CMS ZEV Commercial VMT 320,876 2,077,153 3,279,730 4,749,108 6,835,717 GWh per year 5 18 33 50 72
Overachieve CMS Implementation - 40% passenger ZEV penetration & 50% commercial ZEV penetration 2025 2030 2035 2040 2045 Percentage of passenger vehicles that are electric (%) 11.7% 45.0% 63.3% 81.7% 100.0% # of passenger ZEVs 2,330 9,531 13,558 17,669 21,817
Percentage of commercial vehicles that are electric (%) 8.5% 50.2% 66.8% 83.4% 100.0% # of commercial ZEVs 171 1,061 1,427 1,801 2,177
Total # of ZEVs 2,500 10,592 14,986 19,470 23,994
CMS ZEV VMT 15,497,472 64,764,039 96,789,890 132,160,918 177,948,622 CMS ZEV Passenger VMT 15,098,901 62,170,394 92,932,855 126,764,842 170,353,381 CMS ZEV Commercial VMT 398,571 2,593,645 3,857,036 5,396,076 7,595,241 GWh per year 6 27 41 58 80
Inputs and Assumptions
EV Input Value Calculations
9.B.d
Packet Pg. 336 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Energy and Demand Forecasting) PV Watts Solar Assumptions
9.B.d
Packet Pg. 337 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Comparison Between ResStock and Other Data Sources (i.e., CA eTRM and ENERGY STAR) HP Water Heater1 Std Efficiency HP HVAC2 Stove/Range Dryer Single Family
ResStock 799 2,741 285 216
eTRM savings 1,592 1,334 375 462
ENERGY STAR website 1,184 N.D. 229 528
Multi Family
ResStock 498 1,139 246 96
eTRM 1,178 115 263 185
ENERGY STAR website 846 N.D. 202 419
Notes:
1. ResStock, eTRM and ENERGY STAR present increased electricity for heat pump water heater
2. ResStock present minimum-efficiency heat pump for dwelling units with non-electric heating, whereas eTRM presents data for ducted, standard efficiency HVAC with 3 ton capacity when a previous AC unit was present
9.B.d
Packet Pg. 338 Attachment: Appendix B Supporting Data for Scenario Development (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Power BI Desktop
I already have an EV.
0 100
All Electri… Plug-In H…
I plan to purchase an
EV this year.
0 100
All Electric… Plug-In H…
I plan to purchase an EV
within the next 5 years.
0 100
All Electric EV Plug-In Hybri…
I plan to purchase an EV
after the next 5 years.
0 100
All Electric EV Plug-In Hybri…
If you already have or plan to have an EV, when will you charge your electric vehicle most often? 28 (16.57%)
10 (5.92%)
1 (0.59%)
56 (33.14%)
20 (11.83%)
41 (24.26%)
13 (7.69%)
During the daytime at home
During the daytime at work or at a public charger
Overnight at a public charger
Overnight at home, starting right when I get home in…
Overnight at home, starting at midnight
Overnight at home, managed for a 'ready by' time in …
Other
*Not applicable, I do not plan to purchase an EV
If you already have or plan to have an EV, when will
you charge your electric vehicle most often Other
(please specify)
At Tesla superchargers
Have no idea.
Haven't put much thought in that yet.
I charge prior to when I know I will need the car to have a full battery
Overnight after 9PM
Overnight at home starting around 7pm.
Overnight at home, starting at 9 pm
Overnight, after prime time
Uncertain
undecided
use the chargers at the city hall I also have charger at home
Whenever I get home
whenever it gets down to 20% battery
Survey Language
English
Spanish I am not sure/do not plan/not applicable.
0 50
100
150
200
I am not sure/und… I do not plan t… Not applicable
I have or plan to purchase
an EV.
0 50
100
150
200
Residential EVs
*NA responses filtered out. (Total of 73 respondents selected NA.) 339
Residential Responses
9.B.e
Packet Pg. 339 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Power BI Desktop
Do you plan to install solar at your home, or encourage your landlord/property manager? 71 (24.15%)
8 (2.72%)
25 (8.5%)
13 (4.42%)
58 (19.73%)
119 (40.48%)
I already have solar installed at my home.
I plan to install solar this year.
I plan to install solar within the next 5 years.
I plan to install solar, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to install solar in the future.
Survey Language
English
Spanish
If you already have or plan to have solar, will you include battery storage? 34 (21.38%)
27 (16.98%)
58 (36.48%)
30 (18.87%)
10 (6.29%)
Yes, with battery mainly for back up
Yes, with battery mainly to avoid peak pricing and exc… Not sure/undecided
No
Other (please specify)
None of the above/ Not applicable, I do not plan to i…
If you already have or plan to have solar, will you
include battery storage Other (please specify)
Already have battery
Depends on City Fees/Requirements, Battery/Equipment
installation costs, Rebates from Local & State. Not
looking like any Federal rebates in the next 4 years!
for both
Generator is installed
if i can afford it
I'm sure the installer will tell me how it works.
We have solar and have battery storage
We would like to add batteries but they are very
expensive. It would have doubled the cost of our
installation
We would love to have a battery but have discovered
that since our vendor went out of business, other
vendors will not attach a battery to our existing system.
Will get battery when pricing is better
Residential Solar
*NA responses filtered out. (Total of 97 respondents selected NA.) 339
Residential Responses
9.B.e
Packet Pg. 340 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Spanish
Do you plan to install efficient electric appliances at your home, or encourage your landlord/property manager? Heating/Cooling (heat pump)
0 100
71 9
23 27 35
96 9
I have already switched.
I plan to switch this year.
I plan to switch within the next 5 years.
I plan to switch, but probably not for at least 5…
I am not sure/undecided.
I do not plan to switch this appliance in the fut…
Not Applicable
Do you plan to install efficient electric appliances at your home, or encourage your landlord/property manager? Water Heating (heat pump)
0 100
48 12
22 28 33
98 9
I have already switched.
I plan to switch this year.
I plan to switch within the next 5 years.
I plan to switch, but probably not for at least 5…
I am not sure/undecided.
I do not plan to switch this appliance in the fut…
Not Applicable
Do you plan to install efficient electric appliances at your home, or encourage your landlord/property manager? Cooking (stove/range)
0 100
71 9
20 11
28 115
8 I have already switched.
I plan to switch this year.
I plan to switch within the next 5 years.
I plan to switch, but probably not for at least 5…
I am not sure/undecided.
I do not plan to switch this appliance in the fut…
Not Applicable
I have or plan to have
electric heating/cooling.
0 100
I am not sure/do not plan/not
applicable.
0 100
I am not s… I do not … Not Appli…
I have or plan to have
electric water heating.
0 100
I am not sure/do not plan/not
applicable.
0 100
I am not s… I do not … Not Appli…
I am not sure/do not plan/not
applicable.
0 100
I am not s… I do not … Not Appli…
I have or plan to have
electric cooking.
0 100
Residential Appliances 339
Residential Responses
9.B.e
Packet Pg. 341 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Spanish
Which of the following applies to you?
228 (81.43%)
30 (10.71%)
13 (4.64%)
I own a home in Healdsburg.
I rent a home in Healdsburg.
I own multiple homes in Healdsburg.
Other
Which of the following applies to you Other (please specify)
airbnb
I am a resident of Enso Village
I rent an apartment
My partner owns the home, but I live with him and share all expenses.
Own 4-plex
Rent apartment at Oak Grove Apartments
Retirement community
Unincorporated Kinley Drive
Why not ask what the service is at your home and how you plan to charge a car, run an A/c an electric stove, electric dry
Residential Demographics 339
Residential Responses
Which language is predominantly spoken at your home?
266 (96.73%)
4 (1.45%)
English
Spanish
Other (please specify)
Prefer not to answer
What is your age group?
38 (13.72%)
(25.99%)
154 (55.6%)
13 (4.69%)
72 Under 18
18-24
25-44
45-64
65+
Prefer not to answer
9.B.e
Packet Pg. 342 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Spanish
What are the main factors for your energy project decisions? 0 50 100 150
150
104
96 50
45 43
83 33
22 33
Initial purchase costs (equip…
Ongoing costs (maintenanc…
Electric and gas prices
Federal tax credits
State rebate programs
Local rebate programs
Carbon reductions
State regulations (e.g. future…
None of the above
Other (please specify)
What are the main factors for your energy project decisions Other (please specify)
a gas stove top will always be in my kitchen
all electric is not a sustainable future and its going to be more costly than gas Already have thingsset
As renters we have no control over the decision. What would incentivize the owners? Bought a home that is all electric
City/State/Federal rebates to offset Expen$e of installation and ROI Climatecontrol
Community decision- cost
Concern about the reliability of the electric grid.
elec grid needs upgrades and new generation
electric generation is inadequate in this area and that is the State's fault energy independence and changing the electric utility system I no longer drive. I have relatively new appliances.
I prefer gas
I rent and don’t own my residence.
If/when I have the ability to remodel I might consider some of these factors.
Natural gas is more efficient and more reliable. Our power grid is less reliable and gets shut off occasionally.
Old heating system died in Sept 2024- installed new Heat pump /air Power outages incline me to not change our stove. If the power goes out we can still boil water with a gas stove.
Prefer to cook with gas
Quality and diversity of source for heat, cooking
Rebates , tax credits…
Regular electrical outages and lack of sufficient electricity supply for all electric vehicles and appliances Renter and do not get to make these decisions
Satisfied with current choices
See number 7. I no longer drive & sold my hybrid.
Service amperage and carrying capacity
Since I am a renter, my landlord makes the decisions about upgrading or changing systems. If I could, I'd install solar panels.
The current price of electricity in Healdsburg
the long term payback exceeds equipment life
To retain competitive energy options. Not smart to put all your eggs in the electric basket.
Too much draw in current power grid
We rent a home and don't want to invest in someone else's home Residential Main Factors 339
Residential Responses
9.B.e
Packet Pg. 343 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Spanish
Please provide any additional comments that will help Healdsburg Electric Department to forecast future electricity use and demands. (Optional) Open-Ended Response
1. You already know how many solar customers you have and should also know how many customers have EVs and the number of EVs that they have (we have 2 for example). You should also be aware of how much energy storage is on your system right? When you forecast future electricity use and demand, the forecast should be based on your PLAN for the future. What is your plan for the future? How seriously are you considering V2G? When does V2G come into play? How will you "tailor" V2G customer usage? What will be your strategy for monetizing and incentivizing V2G usage to result in the most robust affordable electricity service? Imagine the future that is coming fast. EVs capable of inductive charging and with full FSD like the Tesla Robotaxi. No charge ports necessary because you have a plan for having inductive charging embedded in your parking spots just on the outskirts of town that will allow Healdsburg to close parts of the center of town to through traffic. Solar is becoming more and more affordable, my 400Watt modules cost less than the Enphase microinverters. Have a plan in place where all homeowners can have upgraded electrical, solar, storage and EV charging capacity (unless it is truly impractical or too expensive - this will likely be very few customers). The utility should subsidize this in lieu of new generation or to get off of geothermal in the geysers. But the customers should own the system, not the utility (that doesn't work, refer to Arizona and SMUD). IOUs and munis need to re-think what they do and who they serve. You need to SERVE...I did, its better when you actual serve someone. That is why they called it Civil Service. Power to the People knuckleheads.
Again, I don't get to make decisions about the systems in the house I rent. I'd be open to making changes but not my choice to make.
Appreciate this effort!
as a senior household, the current increasing costs of utilities are troublesome. due to our fixed income it impacts the affordability of solar etc.
City electric price tiers thoroughly discourage me from adding induction cooking. Installing a heat pump to replace gas wall heaters stopped my electric conversion. Electric demand water heaters are decidedly inferior to my gas demand heaters, so I’ll wait.
City of HBG prices are outrageous.
City of Healdsburg utility costs are absurdly high!!! We are very careful in our usage and hours of use but as one person living in home it's almost unaffordable.
Consider under grounding areas close to wild lands (wui). This will greatly reduce fire hazards Current estimate is $50,000-$65,000 for Heat Pump HVAC and Solar PV for 1800 s.f. residence. That's a huge investment and a LONG timeline for payback. City only returns 50% on excess electricity generated into their grid for re-sale.
Do you plan to add capacity?
Don’t cram your agenda down the throats of the citizens. Everyone gets to choose their own adventure.
Don't get rid of the diesel backup generators
Electric Panel Upgrade costs are a barrier to upgrading Heating/AC to heat pump.
Electricity and Energy are egregiously priced in Healdsburg and our roads are terrible. Focus on this fixing this and less on items that don't favorably impact the majority of residents.
Enso Village (where I live) is very environmentally conscious and has electrified everything they possibly could. The commercial grade kitchen is the only place you'll find gas appliances.
Even though I would like my landlord to install solar or change heating to electric, I will never be able to convince the bastard.
Getting rid of gas improves safety
Healdsburg needs to stop penalizing year round citizens and stop increasing energy and water rates. Bloodsuckers! I am puzzled by the process I thought I signed up for to charge at optimum times from a cost standpoint I am very frustrated with the city’s current rate hike. There are two people in my duplex rental home and our Healdsburg utility bill is $300. It’s unsustainable.
I cannot afford solar, but support its use.
I choose to cook with gas. It is vastly better that electric stoves. It is none of the local government’s business how I cook. I would never purchase a home that does not provide me the option of cooking with gas.
I drive a non-plug in SUV and get 45 MPG. The cost of an equivalent EV is not at all affordable when you live on Social Security I find my heating bill is much higher with electric and less efficient therefore I will not be switching to electric on any other appliances.
I have have had a pv system for the past 10 years but have recently added purchased an EV vehicle and am considering expanding my pv system to account for the additional need.
I have solar heat for pool and 2 EV autos
I was astounded that I was gone for 2 weeks in Dec 2024 to early Jan and my electric bill for that period was quite high - I believe that if we have changed over - that there should be a rate for those that have a heat pump (requiring the fan to be operable during the window of heat).
Residential Comments 339
Residential Responses
9.B.e
Packet Pg. 344 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Spanish
Please provide any additional comments that will help Healdsburg Electric Department to forecast future electricity use and demands. (Optional) Open-Ended Response
I would love to go solar, but don’t use enough electricity to make it financially worthwhile I wouldn’t make any changes that required upsizing our 200a panel or the supply wiring from COH I'd have installed solar panels, but the city building code won't allow on my roof given the proximity of skylights.
If battery storage became cheaper we would consider adding batteries to our solar system to stretch that power beyond the daylight hours.
I'm not switching anything to electric. I already have an EV, that's all I need. Do not mess with natural gas...its NATURAL! Increase energy production and storage to keep cost low.
Increasing electricity costs may make me more likely to charge at public chargers. it is NOT affordable to have to convert gas stove and heater to electric - NOR do i want to be accountabile to the electric grid, pge, increased electric costs, no access when power poles go down, lack of trust of pge etc My water bill is completely unaffordable. Please work on lowering water rates and scrapping the Green New Scam and other waste of taxpayer money initiatives. our energy use is low and HBG electric rates are low so we are not motivated to install solar or electrify Please consider a electricity buy back incentive
Please lower the cost of electric, water and sewage
Power shut offs during high fire watch season will deter me from going electric Range is upscale gas. Gas water heater is newer and tankless, at least. Two gas furnaces (upstairs and downstairs) are operating fine. Doubt owners will replace any of these appliances as long as this is a rental.
Stop raising prices it is becoming more and more difficult to live in Healdsburg.
Thanks for doing this. Also would like to look at options for moving away from the City grid in the future.
Thanks to the Utility Department for providing residents with valuable information. Terra did a great job speaking at the Climate Action Healdsburg meeting last night.
The state does not have the infrastructure to go all electric. We are a free state and we should have all options for energy. Electric batteries cause more harm on the environment than fossil fuels. Your woke plans are too costly. We are being over charged. The city should not tell us how to live our lives. They should focus on providing utilities at an affordable price There is little or no effort in the rest of the USA to make our sacrifice meaningful. Finally, the cost per citizen is what is making this State unaffordable and is contributing to the homeless crises.
We are in our 80's. If we were younger we would most definitely upgrade our heat.Cooling to heat pump. Unfortunately, our current system is not very old but should it fail, we will definitely switch.
We don’t plan on ever changing to Electric. Do not implement any mandates. The Climate mobilization strategy is virtue signaling and should have never been approved. The woke approach of Healdsburg is very unfortunate.
We had new appliances installed in 2014. The cost to replace them with electric ones when they have not worn out is prohibitive We save water during a crisis and you raise our rates. Once it's all electric, you will just raise the rates even more. Stop greenwashing us about all electric.
We used to have a hybrid/Electric vehicle, but sold it in 2020. we'd like to switch to more electric appliances, especially the dryer. Preferably a washer/dryer combo machine. But we've maxed out what our electrical box holds, so can't handle what another electric appliance would need without an overhaul of our whole electrical box. Just so you know another factor driving our decisions...
When my EV vehicle lease is up in January 2026, I may switch to EV/hybrid. Road trips take twice as long because of charging times and there is anxiety about finding a charger that works fast. City of Healdsburg appears to have stopped rebates for charging after 7:30 pm, too.
will move to HBG full-time in the next few years
Workshop activity response
X
You need to be upfront with consumers about the 100 or even 200 amp service that they have not being able to sustain all electric appliances and call three to five local electrical contractors to get real world pricing unlike the information that has been previously disseminated on this topic.
Residential Comments 339
Residential Responses
9.B.e
Packet Pg. 345 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Power BI Desktop
I already have an EV.
0 10
20 All Electri… Plug-In H…
I plan to purchase an
EV this year.
0 10
20 All Electric… Plug-In H…
I plan to purchase an EV
within the next 5 years.
0 10
20 All Electric EV Plug-In Hybri…
I plan to purchase an EV
after the next 5 years.
0 10
20 All Electric EV Plug-In Hybri…
Do you plan to install EV chargers at your business, or encourage the property owner? If so, when? 3 (25%)
6 (50%) 2 (16.67%)
1 (8.33%)
I already have EV chargers at my business.
I plan to install EV chargers this year.
I plan to install EV chargers within the next 5 years.
I plan to install EV chargers, but probably not for at least 5 … None of the above / Not applicable, I do not plan to install … Other (please specify)
Do you plan to install EV chargers at your business, or encourage the property owner Other (please specify)
City Fees and Cost of installation currently prohibit installation of EV Charger Survey Language
English
I am not sure/do not plan/not applicable.
0 10
20 I am not sure/und… I do not plan t… Not applicable
I have or plan to purchase
an EV.
0 10
20 Commercial EVs 14
Commercial Responses
9.B.e
Packet Pg. 346 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Power BI Desktop
Do you plan to install solar at your business, or encourage your landlord/property manager? 3 (25%)
1 (8.33%)
2 (16.67%)
6 (50%)
I already have solar installed at my business.
I plan to install solar this year.
I plan to install solar within the next 5 years.
I plan to install solar, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to install solar at my business in the future.
Survey Language
English
If you already have or plan to have solar, will you include battery storage? 1 (16.67%)
3 (50%)
2 (33.33%) Yes, with battery mainly for back up
Yes, with battery mainly to avoid peak/demand pric…
Not sure/undecided
No
Other (please specify)
None of the above / Not applicable, I do not plan t…
If you already have or plan to have
solar, will you include battery storage
Other (please specify)
My system feeds back into the City grid.
I get credit for excess energy
generated.
City Fees and Cost of installation
currently prohibit installation of Battery
Storage
14 Commercial Responses
Commercial Solar
*NA responses filtered out. (Total of 4 respondents selected NA.)
9.B.e
Packet Pg. 347 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Do you plan to install efficient electric appliances at your business, or encourage the property owner? Heating/Cooling (heat pump) 0 5
10 I have already switched to electric appliances at my busi… I plan to switch to electric appliances this year.
I plan to switch to electric appliances within the next 5 y… I plan to switch, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to switch this appliance to electric at my b… Not applicable
Do you plan to install efficient electric appliances at your business or encourage the property owner? Water Heating (heat pump) 0 5
10 I have already switched to electric appliances at my busi… I plan to switch to electric appliances this year.
I plan to switch to electric appliances within the next 5 y… I plan to switch, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to switch this appliance to electric at my b… Not applicable
Do you plan to install efficient electric appliances at your business, or encourage the property owner? Cooking (stove/range) 0 5
10 I have already switched to electric appliances at my busi… I plan to switch to electric appliances this year.
I plan to switch to electric appliances within the next 5 y… I plan to switch, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to switch this appliance to electric at my b… Not applicable
Do you plan to install
efficient electric
appliances at your
business, or encourage
the property owner
Other (please specify)
am not hgappy with the
switch to heat pump
14 Commercial Responses
Commercial Appliances
9.B.e
Packet Pg. 348 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Surv Power BI Desktop ey Language
English
Which of the following applies to you?
8 (66.67%)
2 (16.67%)
2 (16.67%)
I own a commercial building in Healdsbu…
I own multiple commercial buildings in H…
I rent a commercial building in Healdsbu…
Other
What are the main factors for your energy project decisions? 0 1 2 3 4 5 6
6 5
1 2
1 2
3 Initial purchase costs (equipment, vehicle, installation) Ongoing costs (maintenance, cost savings, bills, etc.)
Electric and gas prices
Federal tax credits
State rebate programs
Local rebate programs
Carbon reductions
State regulations (e.g. future new vehicle purchases, potent… None of the above
Other (please specify)
What are the main factors for your energy project decisions Other (please specify)
I don't own the building
City Fees and cost of equipment/installation
all rebates offered
Please provide any additional comments that will help Healdsburg Electric Department to forecast future electricity use and demands. (Optional) Open-Ended Response
Equipment, Contractor Costs, City Regulations/Fees are making it infeasible for improvements to be undertaken.
I have a personal EV that I charge at my warehouse. I use a 50a circuit that was installed for. A welder.
14 Commercial Responses
Commercial General, Main Factors & Comments
9.B.e
Packet Pg. 349 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Community Electrification Survey
1 / 30
2.23% 8
93.85% 336
3.91% 14
Q1 Which of the following best describes you? (If both apply to you, please complete the survey twice, e.g. once for each option.)
Answered: 358 Skipped: 0
TOTAL 358
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
None of the
above
I own or rent
a
house/condo/...
I
own/manage/rent
a commercial...
ANSWER CHOICES RESPONSES
None of the above
I own or rent a house/condo/apartment in Healdsburg.
I own/manage/rent a commercial building in Healdsburg.
9.B.e
Packet Pg. 350 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
2 / 30
Q2 Do you plan to purchase an electric vehicle in the future? If so, when? (Select all options that are applicable. For example, if you already have an EV and plan to replace another gas vehicle in the future, or if you plan to replace more than 1 vehicle with an EV in the future. Please do not count replacing a current EV with a new EV. For any rows that do not apply, you can leave blank.)
Answered: 281 Skipped: 77
9.B.e
Packet Pg. 351 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) C
ommunityElectrificationSurvey
3/30
0%10%20%30%40%50%60%70%80%90%100%
Plug-InHyb…AllElectric… I already have an electric vehicle. I plan to purchase an electric... I plan to purchase an electric... I plan to purchase an electric... I am not sure/undecided. I do not plan
to purchase an
electric... Not applicable
9.B.e
Packet Pg. 352 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
4 / 30
29.79%
28 74.47%
70 94
26.67%
4 73.33%
11 15
53.45%
31 55.17%
32 58
48.57%
17 62.86%
22 35
80.00%
36 57.78%
26 45
79.75%
63 91.14%
72 79
71.43%
5 85.71%
6 7
PLUG-IN HYBRID
EV
ALL ELECTRIC
EV
TOTAL
RESPONDENTS
I already have an electric vehicle.
I plan to purchase an electric vehicle this year.
I plan to purchase an electric vehicle within the next 5 years.
I plan to purchase an electric vehicle, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to purchase an electric vehicle in the future.
Not applicable
9.B.e
Packet Pg. 353 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
5 / 30
30.29% 73
11.62% 28
3.73% 9
0.41% 1
23.24% 56
8.30% 20
17.01% 41
5.39% 13
Q3 If you already have or plan to have an EV, when will you charge your electric vehicle most often?
Answered: 241 Skipped: 117
TOTAL 241
# OTHER (PLEASE SPECIFY) DATE
1 whenever it gets down to 20% battery 3/30/2025 1:42 PM 2 Overnight after 9PM 3/27/2025 4:23 PM
3 Whenever I get home 3/17/2025 4:19 AM
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
None of the
above / Not
applicable, ...
During the
daytime at home
During the
daytime at work
or at a publ...
Overnight at a
public charger
Overnight at
home, starting
right when I...
Overnight at
home, starting
at midnight
Overnight at
home, managed
for a 'ready...
Other (please
specify)
ANSWER CHOICES RESPONSES
None of the above / Not applicable, I do not plan to purchase an EV During the daytime at home
During the daytime at work or at a public charger
Overnight at a public charger
Overnight at home, starting right when I get home in the evening Overnight at home, starting at midnight
Overnight at home, managed for a 'ready by' time in the morning Other (please specify)
9.B.e
Packet Pg. 354 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) C
ommunityElectrificationSurvey
6/30
4Overnightathome, startingat9pm3/12/20257:46AM
5undecided3/11/20256:44PM
6Uncertain3/11/20255:37PM
7AtTeslasuperchargers3/11/20255:00PM
8 I chargepriortowhen I know I will needthecartohaveafull battery3/11/20252:18PM 9usethechargersatthecityhall I alsohavechargerathome3/11/20251:29PM 10Overnight, afterprimetime3/11/20251:02PM
11Haven'tputmuchthought inthatyet. 3/11/202512:27PM
12Overnightathomestartingaround7pm. 3/11/202512:18PM
13Haveno idea. 3/11/202511:33AM
9.B.e
Packet Pg. 355 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
7 / 30
24.23% 71
2.73% 8
8.53% 25
4.44% 13
19.80% 58
40.27% 118
Q4 Do you plan to install solar at your home, or encourage your landlord/property manager?
Answered: 293 Skipped: 65
TOTAL 293
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
I already have
solar installed
at my home.
I plan to
install solar
this year.
I plan to
install solar
within the n...
I plan to
install solar,
but probably...
I am not
sure/undecided.
I do not plan
to install
solar in the...
ANSWER CHOICES RESPONSES
I already have solar installed at my home.
I plan to install solar this year.
I plan to install solar within the next 5 years.
I plan to install solar, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to install solar in the future.
9.B.e
Packet Pg. 356 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
8 / 30
38.04% 97
13.33% 34
10.59% 27
22.75% 58
11.37% 29
3.92% 10
Q5 If you already have or plan to have solar, will you include battery storage?
Answered: 255 Skipped: 103
TOTAL 255
# OTHER (PLEASE SPECIFY) DATE
1 We would like to add batteries but they are very expensive. It would have doubled the cost of our installation
3/16/2025 3:07 PM
2 for both 3/16/2025 9:14 AM
3 Already have battery 3/11/2025 9:49 PM
4 We have solar and have battery storage 3/11/2025 2:18 PM 5 I'm sure the installer will tell me how it works. 3/11/2025 2:01 PM 6 We would love to have a battery but have discovered that since our vendor went out of 3/11/2025 1:51 PM 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
None of the
above / Not
applicable, ...
Yes, with
battery mainly
for back up
Yes, with
battery mainly
to avoid pea...
Not
sure/undecided
No
Other (please
specify)
ANSWER CHOICES RESPONSES
None of the above / Not applicable, I do not plan to install solar Yes, with battery mainly for back up
Yes, with battery mainly to avoid peak pricing and excess generation Not sure/undecided
No
Other (please specify)
9.B.e
Packet Pg. 357 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
9 / 30
business, other vendors will not attach a battery to our existing system. 7 if i can afford it 3/11/2025 1:51 PM
8 Generator is installed 3/11/2025 1:02 PM
9 Depends on City Fees/Requirements, Battery/Equipment installation costs, Rebates from Local & State. Not looking like any Federal rebates in the next 4 years! 3/11/2025 12:40 PM
10 Will get battery when pricing is better 3/11/2025 12:38 PM
9.B.e
Packet Pg. 358 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
10 / 30
Q6 Do you plan to install efficient electric appliances at your home, or encourage your landlord/property manager?(Select all options that are applicable. For example, if you plan to replace appliances on different schedules. Please do not count replacing a current electric appliance with a new one.For any rows that do not apply, you can leave blank.) Answered: 282 Skipped: 76
I have already
switched to
electric...
I plan to
switch to
electric...
I plan to
switch to
electric...
I plan to
switch to
electric...
I am not
sure/undecided.
I do not plan
9.B.e
Packet Pg. 359 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
11 / 30
58.33%
70 39.17%
47 58.33%
70 120
45.00%
9 60.00%
12 45.00%
9 20
48.94%
23 46.81%
22 42.55%
20 47
57.45%
27 59.57%
28 23.40%
11 47
71.43%
35 67.35%
33 57.14%
28 49
69.57%
96 71.01%
98 83.33%
115 138
75.00%
9 75.00%
9 66.67%
8 12
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Heating/Co… Water Heat… Cooking (st…
p
to switch this
appliance to...
Not Applicable
HEATING/COOLING
(HEAT PUMP)
WATER HEATING
(HEAT PUMP)
COOKING
(STOVE/RANGE)
TOTAL
RESPONDENTS
I have already switched to electric appliances
at my home.
I plan to switch to electric appliances this
year.
I plan to switch to electric appliances within
the next 5 years.
I plan to switch to electric appliances, but
probably not for at least 5 years.
I am not sure/undecided.
I do not plan to switch this appliance to
electric in the future.
Not Applicable
9.B.e
Packet Pg. 360 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
12 / 30
81.36% 227
10.75% 30
4.66% 13
3.23% 9
Q7 Which of the following applies to you?
Answered: 279 Skipped: 79
TOTAL 279
# OTHER (PLEASE SPECIFY) DATE
1 airbnb 3/16/2025 9:14 AM
2 Retirement community 3/11/2025 11:36 PM
3 I rent an apartment 3/11/2025 10:15 PM
4 Own 4-plex 3/11/2025 4:22 PM
5 Why not ask what the service is at your home and how you plan to charge a car, run an A/c an electric stove, electric dry
3/11/2025 4:08 PM
6 Rent apartment at Oak Grove Apartments 3/11/2025 12:27 PM 7 My partner owns the home, but I live with him and share all expenses. 3/11/2025 11:46 AM 8 Unincorporated Kinley Drive 3/11/2025 11:42 AM
9 I am a resident of Enso Village 3/11/2025 11:41 AM
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
I own a home
in Healdsburg.
I rent a home
in Healdsburg.
I own multiple
homes in
Healdsburg.
Other (please
specify)
ANSWER CHOICES RESPONSES
I own a home in Healdsburg.
I rent a home in Healdsburg.
I own multiple homes in Healdsburg.
Other (please specify)
9.B.e
Packet Pg. 361 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
13 / 30
Q8 Do you plan to purchase company electric vehicles in the future? If so, when?(Select all options that are applicable. For example, if you already have an EV and plan to replace another gas vehicle in the future, or if you plan to replace more than 1 vehicle with an EV in the future. Please do not count replacing a current EV with a new EV.For any rows that do not apply, you can leave blank.)
Answered: 12 Skipped: 346
9.B.e
Packet Pg. 362 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) C
ommunityElectrificationSurvey
14/30
0%10%20%30%40%50%60%70%80%90%100%
Plug-InHyb…AllElectric… I already have company electric... I plan to purchase company... I plan to purchase company... I plan to purchase company... I am not sure/undecided. I do not plan to purchase company... Not applicable
9.B.e
Packet Pg. 363 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
15 / 30
33.33%
1 66.67%
2 3
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
100.00%
2 50.00%
1 2
80.00%
4 60.00%
3 5
100.00%
3 100.00%
3 3
PLUG-IN HYBRID
EV
ALL ELECTRIC
EV
TOTAL
RESPONDENTS
I already have company electric vehicles.
I plan to purchase company electric vehicles this year.
I plan to purchase company electric vehicles within the next 5 years.
I plan to purchase company electric vehicles, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to purchase company electric vehicles.
Not applicable
9.B.e
Packet Pg. 364 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
16 / 30
50.00% 6
25.00% 3
0.00% 0
16.67% 2
0.00% 0
8.33% 1
Q9 Do you plan to install EV chargers at your business, or encourage the property owner? If so, when?(Select all options that are applicable. For example, if you already have an EV charger and plan to install another in the future. Please do not count replacing a current charger with a new one.)
Answered: 12 Skipped: 346
Total Respondents: 12
# OTHER (PLEASE SPECIFY) DATE
1 City Fees and Cost of installation currently prohibit installation of EV Charger 3/11/2025 12:30 PM 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
None of the
above / Not
applicable, ...
I already have
EV chargers at
my business.
I plan to
install EV
chargers thi...
I plan to
install EV
chargers wit...
I plan to
install EV
chargers, bu...
Other (please
specify)
ANSWER CHOICES RESPONSES
None of the above / Not applicable, I do not plan to install EV chargers I already have EV chargers at my business.
I plan to install EV chargers this year.
I plan to install EV chargers within the next 5 years.
I plan to install EV chargers, but probably not for at least 5 years.
Other (please specify)
9.B.e
Packet Pg. 365 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
17 / 30
25.00% 3
0.00% 0
0.00% 0
8.33% 1
16.67% 2
50.00% 6
Q10 Do you plan to install solar at your business, or encourage the property owner?
Answered: 12 Skipped: 346
TOTAL 12
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
I already have
solar installed
at my business.
I plan to
install solar
this year.
I plan to
install solar
within the n...
I plan to
install solar,
but probably...
I am not
sure/undecided.
I do not plan
to install
solar at my...
ANSWER CHOICES RESPONSES
I already have solar installed at my business.
I plan to install solar this year.
I plan to install solar within the next 5 years.
I plan to install solar, but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to install solar at my business in the future.
9.B.e
Packet Pg. 366 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
18 / 30
40.00% 4
10.00% 1
0.00% 0
0.00% 0
30.00% 3
20.00% 2
Q11 If you already have or plan to have solar, will you include battery storage?
Answered: 10 Skipped: 348
TOTAL 10
# OTHER (PLEASE SPECIFY) DATE
1 City Fees and Cost of installation currently prohibit installation of Battery Storage 3/11/2025 12:30 PM 2 My system feeds back into the City grid. I get credit for excess energy generated. 3/11/2025 12:09 PM 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
None of the
above / Not
applicable, ...
Yes, with
battery mainly
for back up
Yes, with
battery mainly
to avoid...
Not
sure/undecided
No
Other (please
specify)
ANSWER CHOICES RESPONSES
None of the above / Not applicable, I do not plan to install solar Yes, with battery mainly for back up
Yes, with battery mainly to avoid peak/demand pricing and excess generation Not sure/undecided
No
Other (please specify)
9.B.e
Packet Pg. 367 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
19 / 30
Q12 Do you plan to install efficient electric appliances at your business, or encourage the property owner?(Select all options that are applicable. For example, if you plan to replace appliances on different schedules. Please do not count replacing a current electric appliance with a new one.For any rows that do not apply, you can leave blank.)
Answered: 10 Skipped: 348
I have already
switched to
electric...
I plan to
switch to
electric...
I plan to
switch to
electric...
I plan to
switch to
electric...
I am not
sure/undecided.
I do not plan
9.B.e
Packet Pg. 368 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
20 / 30
75.00%
3 25.00%
1 0.00%
0 4
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
100.00%
1 0.00%
0 0.00%
0 1
66.67%
2 100.00%
3 66.67%
2 3
80.00%
4 60.00%
3 60.00%
3 5
# OTHER (PLEASE SPECIFY) DATE
1 am not hgappy with the switch to heat pump 3/11/2025 12:38 PM 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Heating/Co… Water Heat… Commercia…
p
to switch this
appliance to...
Not applicable
HEATING/COOLING
(HEAT PUMP/RTU)
WATER HEATING
(HEAT
PUMP/BOILER)
COMMERCIAL
KITCHEN
(STOVE/OVEN)
TOTAL
RESPONDENTS
I have already switched to electric
appliances at my business.
I plan to switch to electric appliances
this year.
I plan to switch to electric appliances
within the next 5 years.
I plan to switch to electric appliances,
but probably not for at least 5 years.
I am not sure/undecided.
I do not plan to switch this appliance
to electric at my business in the
future.
Not applicable
9.B.e
Packet Pg. 369 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
21 / 30
66.67% 8
16.67% 2
16.67% 2
0.00% 0
Q13 Which of the following applies to you?
Answered: 12 Skipped: 346
TOTAL 12
# OTHER (PLEASE SPECIFY) DATE
There are no responses.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
I own a
commercial
building in...
I rent a
commercial
building in...
I own multiple
commercial
buildings in...
Other (please
specify)
ANSWER CHOICES RESPONSES
I own a commercial building in Healdsburg.
I rent a commercial building in Healdsburg.
I own multiple commercial buildings in Healdsburg.
Other (please specify)
9.B.e
Packet Pg. 370 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
22 / 30
Q14 What are the main factors for your energy project decisions? (Select up to 3.)
Answered: 286 Skipped: 72
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
None of the
above
Initial
purchase costs
(equipment,...
Ongoing costs
(maintenance,
cost savings...
Electric and
gas prices
Federal tax
credits
State rebate
programs
Local rebate
programs
Carbon
reductions
State
regulations
(e.g. future...
Other (please
specify)
9.B.e
Packet Pg. 371 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
23 / 30
8.39% 24
54.20% 155
38.11% 109
33.57% 96
17.83% 51
16.43% 47
15.38% 44
29.37% 84
11.54% 33
12.59% 36
Total Respondents: 286
# OTHER (PLEASE SPECIFY) DATE
1 I rent and don’t own my residence. 3/17/2025 6:35 PM
2 Power outages incline me to not change our stove. If the power goes out we can still boil water with a gas stove.
3/16/2025 3:09 PM
3 energy independence and changing the electric utility system 3/16/2025 9:43 AM 4 Since I am a renter, my landlord makes the decisions about upgrading or changing systems. If I could, I'd install solar panels.
3/15/2025 6:56 PM
5 electric generation is inadequate in this area and that is the State's fault 3/13/2025 9:15 AM 6 Satisfied with current choices 3/13/2025 9:03 AM
7 elec grid needs upgrades and new generation 3/12/2025 4:15 PM 8 all electric is not a sustainable future and its going to be more costly than gas 3/12/2025 2:54 PM 9 Community decision- cost 3/11/2025 11:37 PM
10 The current price of electricity in Healdsburg 3/11/2025 7:06 PM 11 Concern about the reliability of the electric grid. 3/11/2025 5:35 PM 12 Already have thingsset 3/11/2025 5:00 PM
13 Regular electrical outages and lack of sufficient electricity supply for all electric vehicles and appliances
3/11/2025 4:53 PM
14 Service amperage and carrying capacity 3/11/2025 4:11 PM 15 We rent a home and don't want to invest in someone else's home 3/11/2025 3:06 PM 16 To retain competitive energy options. Not smart to put all your eggs in the electric basket. 3/11/2025 2:40 PM 17 a gas stove top will always be in my kitchen 3/11/2025 2:04 PM 18 the long term payback exceeds equipment life 3/11/2025 1:53 PM 19 Quality and diversity of source for heat, cooking 3/11/2025 1:41 PM 20 As renters we have no control over the decision. What would incentivize the owners? 3/11/2025 1:23 PM 21 Renter and do not get to make these decisions 3/11/2025 12:52 PM
ANSWER CHOICES RESPONSES
None of the above
Initial purchase costs (equipment, vehicle, installation) Ongoing costs (maintenance, cost savings, bills, etc.)
Electric and gas prices
Federal tax credits
State rebate programs
Local rebate programs
Carbon reductions
State regulations (e.g. future new vehicle purchases, potential future appliance replacement requirements) Other (please specify)
9.B.e
Packet Pg. 372 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
24 / 30
22 City/State/Federal rebates to offset Expen$e of installation and ROI 3/11/2025 12:47 PM 23 Rebates , tax credits… 3/11/2025 12:41 PM
24 Natural gas is more efficient and more reliable. Our power grid is less reliable and gets shut off occasionally.
3/11/2025 12:39 PM
25 Climatecontrol 3/11/2025 12:35 PM
26 City Fees and cost of equipment/installation 3/11/2025 12:34 PM 27 all rebates offered 3/11/2025 12:10 PM
28 I prefer gas 3/11/2025 12:01 PM
29 Old heating system died in Sept 2024- installed new Heat pump /air 3/11/2025 12:01 PM 30 If/when I have the ability to remodel I might consider some of these factors. 3/11/2025 11:55 AM 31 Too much draw in current power grid 3/11/2025 11:55 AM 32 Bought a home that is all electric 3/11/2025 11:53 AM 33 See number 7. I no longer drive & sold my hybrid. 3/11/2025 11:47 AM 34 I no longer drive. I have relatively new appliances. 3/11/2025 11:45 AM 35 Prefer to cook with gas 3/11/2025 11:37 AM
36 I don't own the building 3/11/2025 11:36 AM
9.B.e
Packet Pg. 373 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
25 / 30
97.19% 277
1.05% 3
1.40% 4
0.35% 1
Q15 Which language is predominantly spoken at your home? Answered: 285 Skipped: 73
TOTAL 285
# OTHER (PLEASE SPECIFY) DATE
1 U 3/11/2025 12:35 PM
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
English
Spanish
Prefer not to
answer
Other (please
specify)
ANSWER CHOICES RESPONSES
English
Spanish
Prefer not to answer
Other (please specify)
9.B.e
Packet Pg. 374 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
26 / 30
0.00% 0
0.00% 0
13.24% 38
27.18% 78
55.05% 158
4.53% 13
Q16 What is your age group?
Answered: 287 Skipped: 71
TOTAL 287
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Under 18
18-24
25-44
45-64
65+
Prefer not to
answer
ANSWER CHOICES RESPONSES
Under 18
18-24
25-44
45-64
65+
Prefer not to answer
9.B.e
Packet Pg. 375 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
27 / 30
Q17 Please provide any additional comments that will help Healdsburg Electric Department to forecast future electricity use and demands. (Optional)
Answered: 75 Skipped: 283
# RESPONSES DATE
1 Workshop activity response 4/2/2025 9:11 AM
2 Workshop activity response 4/2/2025 9:10 AM
3 Workshop activity response 4/2/2025 9:09 AM
4 Workshop activity response 4/2/2025 9:09 AM
5 Workshop activity response 4/2/2025 9:08 AM
6 Workshop activity response 4/2/2025 9:07 AM
7 Workshop activity response 4/2/2025 9:07 AM
8 Workshop activity response 4/2/2025 9:06 AM
9 Workshop activity response 4/2/2025 9:05 AM
10 Workshop activity response 4/2/2025 9:04 AM
11 Workshop activity response 4/2/2025 9:02 AM
12 Workshop activity response 4/2/2025 9:00 AM
13 Workshop activity response 4/2/2025 8:57 AM
14 Workshop activity response 4/2/2025 8:55 AM
15 Workshop activity response 4/2/2025 8:52 AM
16 Workshop activity response 4/2/2025 8:49 AM
17 Workshop activity response 4/2/2025 8:46 AM
18 I wouldn’t make any changes that required upsizing our 200a panel or the supply wiring from COH
3/31/2025 10:17 AM
19 We had new appliances installed in 2014. The cost to replace them with electric ones when they have not worn out is prohibitive
3/30/2025 1:45 PM
20 Appreciate this effort! 3/25/2025 4:15 PM
21 City of Healdsburg utility costs are absurdly high!!! We are very careful in our usage and hours of use but as one person living in home it's almost unaffordable. 3/17/2025 10:46 AM
22 If battery storage became cheaper we would consider adding batteries to our solar system to stretch that power beyond the daylight hours.
3/16/2025 3:09 PM
23 1. You already know how many solar customers you have and should also know how many customers have EVs and the number of EVs that they have (we have 2 for example). You should also be aware of how much energy storage is on your system right? When you forecast future electricity use and demand, the forecast should be based on your PLAN for the future.
What is your plan for the future? How seriously are you considering V2G? When does V2G come into play? How will you "tailor" V2G customer usage? What will be your strategy for monetizing and incentivizing V2G usage to result in the most robust affordable electricity service? Imagine the future that is coming fast. EVs capable of inductive charging and with full FSD like the Tesla Robotaxi. No charge ports necessary because you have a plan for having inductive charging embedded in your parking spots just on the outskirts of town that will allow 3/16/2025 9:43 AM
9.B.e
Packet Pg. 376 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
28 / 30
Healdsburg to close parts of the center of town to through traffic. Solar is becoming more and more affordable, my 400Watt modules cost less than the Enphase microinverters. Have a plan in place where all homeowners can have upgraded electrical, solar, storage and EV charging capacity (unless it is truly impractical or too expensive - this will likely be very few customers).
The utility should subsidize this in lieu of new generation or to get off of geothermal in the geysers. But the customers should own the system, not the utility (that doesn't work, refer to Arizona and SMUD). IOUs and munis need to re-think what they do and who they serve. You need to SERVE...I did, its better when you actual serve someone. That is why they called it Civil Service. Power to the People knuckleheads.
24 Again, I don't get to make decisions about the systems in the house I rent. I'd be open to making changes but not my choice to make.
3/15/2025 6:56 PM
25 Don’t cram your agenda down the throats of the citizens. Everyone gets to choose their own adventure.
3/15/2025 6:07 PM
26 City electric price tiers thoroughly discourage me from adding induction cooking. Installing a heat pump to replace gas wall heaters stopped my electric conversion. Electric demand water heaters are decidedly inferior to my gas demand heaters, so I’ll wait. 3/14/2025 8:45 PM
27 We used to have a hybrid/Electric vehicle, but sold it in 2020. 3/14/2025 3:34 PM 28 There is little or no effort in the rest of the USA to make our sacrifice meaningful. Finally, the cost per citizen is what is making this State unaffordable and is contributing to the homeless crises.
3/13/2025 9:15 AM
29 We save water during a crisis and you raise our rates. Once it's all electric, you will just raise the rates even more. Stop greenwashing us about all electric. 3/12/2025 2:54 PM
30 Please consider a electricity buy back incentive 3/12/2025 11:54 AM 31 I find my heating bill is much higher with electric and less efficient therefore I will not be switching to electric on any other appliances.
3/12/2025 11:06 AM
32 Power shut offs during high fire watch season will deter me from going electric 3/12/2025 10:35 AM 33 Even though I would like my landlord to install solar or change heating to electric, I will never be able to convince the bastard.
3/11/2025 10:17 PM
34 I am very frustrated with the city’s current rate hike. There are two people in my duplex rental home and our Healdsburg utility bill is $300. It’s unsustainable. 3/11/2025 9:26 PM
35 The state does not have the infrastructure to go all electric. We are a free state and we should have all options for energy. Electric batteries cause more harm on the environment than fossil fuels. Your woke plans are too costly. We are being over charged. The city should not tell us how to live our lives. They should focus on providing utilities at an affordable price 3/11/2025 7:42 PM
36 Consider under grounding areas close to wild lands (wui). This will greatly reduce fire hazards 3/11/2025 5:52 PM 37 Thanks for doing this. Also would like to look at options for moving away from the City grid in the future.
3/11/2025 5:39 PM
38 I have have had a pv system for the past 10 years but have recently added purchased an EV vehicle and am considering expanding my pv system to account for the additional need. 3/11/2025 5:10 PM
39 Please lower the cost of electric, water and sewage 3/11/2025 4:54 PM 40 Don't get rid of the diesel backup generators 3/11/2025 4:21 PM 41 You need to be upfront with consumers about the 100 or even 200 amp service that they have not being able to sustain all electric appliances and call three to five local electrical contractors to get real world pricing unlike the information that has been previously disseminated on this topic.
3/11/2025 4:11 PM
42 I'm not switching anything to electric. I already have an EV, that's all I need. Do not mess with natural gas...its NATURAL!
3/11/2025 4:09 PM
43 Electricity and Energy are egregiously priced in Healdsburg and our roads are terrible. Focus on this fixing this and less on items that don't favorably impact the majority of residents. 3/11/2025 2:51 PM
44 I would love to go solar, but don’t use enough electricity to make it financially worthwhile 3/11/2025 2:26 PM
9.B.e
Packet Pg. 377 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
29 / 30
45 Healdsburg needs to stop penalizing year round citizens and stop increasing energy and water rates. Bloodsuckers!
3/11/2025 2:19 PM
46 City of HBG prices are outrageous. 3/11/2025 2:00 PM 47 as a senior household, the current increasing costs of utilities are troublesome. due to our fixed income it impacts the affordability of solar etc. 3/11/2025 1:53 PM
48 it is NOT affordable to have to convert gas stove and heater to electric - NOR do i want to be accountabile to the electric grid, pge, increased electric costs, no access when power poles go down, lack of trust of pge etc
3/11/2025 1:53 PM
49 I choose to cook with gas. It is vastly better that electric stoves. It is none of the local government’s business how I cook. I would never purchase a home that does not provide me the option of cooking with gas.
3/11/2025 1:36 PM
50 I have solar heat for pool and 2 EV autos 3/11/2025 1:31 PM 51 Range is upscale gas. Gas water heater is newer and tankless, at least. Two gas furnaces (upstairs and downstairs) are operating fine. Doubt owners will replace any of these appliances as long as this is a rental.
3/11/2025 1:23 PM
52 I am puzzled by the process I thought I signed up for to charge at optimum times from a cost standpoint
3/11/2025 1:03 PM
53 our energy use is low and HBG electric rates are low so we are not motivated to install solar or electrify
3/11/2025 12:57 PM
54 Stop raising prices it is becoming more and more difficult to live in Healdsburg. 3/11/2025 12:52 PM 55 Current estimate is $50,000-$65,000 for Heat Pump HVAC and Solar PV for 1800 s.f. residence. That's a huge investment and a LONG timeline for payback. City only returns 50% on excess electricity generated into their grid for re-sale. 3/11/2025 12:47 PM
56 I have a personal EV that I charge at my warehouse. I use a 50a circuit that was installed for.
A welder.
3/11/2025 12:42 PM
57 We don’t plan on ever changing to Electric. Do not implement any mandates. The Climate mobilization strategy is virtue signaling and should have never been approved. The woke approach of Healdsburg is very unfortunate.
3/11/2025 12:42 PM
58 Getting rid of gas improves safety 3/11/2025 12:41 PM 59 Equipment, Contractor Costs, City Regulations/Fees are making it infeasible for improvements to be undertaken.
3/11/2025 12:34 PM
60 When my EV vehicle lease is up in January 2026, I may switch to EV/hybrid. Road trips take twice as long because of charging times and there is anxiety about finding a charger that works fast. City of Healdsburg appears to have stopped rebates for charging after 7:30 pm, too.
3/11/2025 12:32 PM
61 Increase energy production and storage to keep cost low. 3/11/2025 12:27 PM 62 Do you plan to add capacity? 3/11/2025 12:26 PM
63 Increasing electricity costs may make me more likely to charge at public chargers. 3/11/2025 12:23 PM 64 We are in our 80's. If we were younger we would most definitely upgrade our heat.Cooling to heat pump. Unfortunately, our current system is not very old but should it fail, we will definitely switch.
3/11/2025 12:21 PM
65 will move to HBG full-time in the next few years 3/11/2025 12:12 PM 66 My water bill is completely unaffordable. Please work on lowering water rates and scrapping the Green New Scam and other waste of taxpayer money initiatives. 3/11/2025 12:01 PM
67 I was astounded that I was gone for 2 weeks in Dec 2024 to early Jan and my electric bill for that period was quite high - I believe that if we have changed over - that there should be a rate for those that have a heat pump (requiring the fan to be operable during the window of heat). 3/11/2025 12:01 PM
68 we'd like to switch to more electric appliances, especially the dryer. Preferably a washer/dryer 3/11/2025 11:58 AM
9.B.e
Packet Pg. 378 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Community Electrification Survey
30 / 30
combo machine. But we've maxed out what our electrical box holds, so can't handle what another electric appliance would need without an overhaul of our whole electrical box. Just so you know another factor driving our decisions...
69 I'd have installed solar panels, but the city building code won't allow on my roof given the proximity of skylights.
3/11/2025 11:55 AM
70 X 3/11/2025 11:50 AM
71 I drive a non-plug in SUV and get 45 MPG. The cost of an equivalent EV is not at all affordable when you live on Social Security
3/11/2025 11:48 AM
72 Enso Village (where I live) is very environmentally conscious and has electrified everything they possibly could. The commercial grade kitchen is the only place you'll find gas appliances. 3/11/2025 11:47 AM
73 I cannot afford solar, but support its use. 3/11/2025 11:45 AM 74 Thanks to the Utility Department for providing residents with valuable information. Terra did a great job speaking at the Climate Action Healdsburg meeting last night. 3/11/2025 11:37 AM
75 Electric Panel Upgrade costs are a barrier to upgrading Heating/AC to heat pump. 3/11/2025 11:34 AM
9.B.e
Packet Pg. 379 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
1 / 21
40.00% 2
60.00% 3
0.00% 0
Q1 ¿Cuál de las siguientes opciones se describe mejor? (Si ambas opciones se aplican a su caso, complete la encuesta dos veces - por ejemplo, una vez para cada opción.)
Answered: 5 Skipped: 0
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Ninguna de las
anteriores
Soy
propietario o
inquilino de...
Soy
propietario/adm
inistrador/i...
ANSWER CHOICES RESPONSES
Ninguna de las anteriores
Soy propietario o inquilino de casa/condominio/apartamento en Healdsburg.
Soy propietario/administrador/inquilino de un edificio comercial en Healdsburg.
9.B.e
Packet Pg. 380 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
2 / 21
Q2 ¿Planea comprar un vehículo eléctrico (VE) en el futuro? Si es así, ¿cuándo?(Seleccione todas las opciones que correspondan. Por ejemplo, si ya tiene un vehículo eléctrico y planea reemplazar otro vehículo a gasolina en el futuro, o si planea reemplazar más de un vehículo con un vehículo eléctrico en el futuro.No cuente el reemplazo de un vehículo eléctrico que ya tiene por uno nuevo.Puede dejar en blanco las filas que no correspondan).
Answered: 1 Skipped: 4
9.B.e
Packet Pg. 381 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) E
ncuestasobreElectrificaciónen laComunidad
3/21
0%10%20%30%40%50%60%70%80%90%100%
VEhíbrido…VEtotalme…
Ya tengo un
vehículo
eléctrico. Planeo compra
r
un vehículo
eléctrico es... Planeo comprar un vehículo eléctrico... Planeo comprar un vehículo eléctrico, p... No estoy seguro/indeciso. No planeo comprar un vehículo... No aplicable
9.B.e
Packet Pg. 382 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
4 / 21
0.00%
0 0.00%
0 0
0.00%
0 100.00%
1 1
0.00%
0 100.00%
1 1
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
VE HÍBRIDO
ENCHUFABLE
VE TOTALMENTE
ELÉCTRICO
TOTAL
RESPONDENTS
Ya tengo un vehículo eléctrico.
Planeo comprar un vehículo eléctrico este año.
Planeo comprar un vehículo eléctrico dentro de los próximos 5 años.
Planeo comprar un vehículo eléctrico, pero probablemente no durante al menos 5 años.
No estoy seguro/indeciso.
No planeo comprar un vehículo eléctrico en el futuro.
No aplicable
9.B.e
Packet Pg. 383 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
5 / 21
0.00% 0
0.00% 0
100.00% 1
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
Q3 Si ya tiene o planea tener un vehículo eléctrico, ¿cuándo cargará su vehículo eléctrico con mayor frecuencia?
Answered: 1 Skipped: 4
TOTAL 1
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Ninguna de las
anteriores / No
aplica, no...
Durante el día
en casa
Durante el día
en el trabajo o
en un cargad...
Durante la
noche en un
cargador...
Durante la
noche en casa,
empezando...
Durante la
noche en casa,
a partir de...
Durante la
noche en case,
con un horar...
Otro (por
favor
especifique)
ANSWER CHOICES RESPONSES
Ninguna de las anteriores / No aplica, no planeo comprar un vehículo eléctrico Durante el día en casa
Durante el día en el trabajo o en un cargador público
Durante la noche en un cargador público
Durante la noche en casa, empezando cuando llegue a casa por la tarde Durante la noche en casa, a partir de medianoche
Durante la noche en case, con un horario para "estar listo" por la mañana Otro (por favor especifique)
9.B.e
Packet Pg. 384 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
6 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
100.00% 1
Q4 ¿Planea instalar energía solar en su casa, o alentar a su propietario/administrador de la propiedad?
Answered: 1 Skipped: 4
TOTAL 1
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Ya tengo
energía solar
instalada en...
Planeo
instalar
energía sola...
Planeo
instalar
energía sola...
Planeo
instalar
energía sola...
No estoy
seguro/indeciso
.
No planeo
instalar
energía sola...
ANSWER CHOICES RESPONSES
Ya tengo energía solar instalada en mi casa.
Planeo instalar energía solar este año.
Planeo instalar energía solar dentro de los próximos 5 años.
Planeo instalar energía solar, pero probablemente no durante al menos 5 años.
No estoy seguro/indeciso.
No planeo instalar energía solar en el futuro.
9.B.e
Packet Pg. 385 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
7 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
100.00% 1
0.00% 0
Q5 Si ya tiene o planea tener energía solar, ¿incluirá almacenamiento de batería?
Answered: 1 Skipped: 4
TOTAL 1
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Ninguna de las
anteriores / No
aplicable, n...
Sí, con
batería
principalmen...
Sí, con
batería
principalmen...
No estoy
seguro/indeciso
No
Otro (por
favor
especifique)
ANSWER CHOICES RESPONSES
Ninguna de las anteriores / No aplicable, no planeo instalar energía solar Sí, con batería principalmente como respaldo
Sí, con batería principalmente para evitar picos de precios y exceso de generación No estoy seguro/indeciso
No
Otro (por favor especifique)
9.B.e
Packet Pg. 386 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
8 / 21
Q6 ¿Planea instalar electrodomésticos eficientes en su hogar, o alentar al propietario/administrador de la propiedad?(Seleccione todas las opciones que correspondan. Por ejemplo, si planea reemplazar electrodomésticos en diferentes horarios.No cuente el reemplazo de un electrodoméstico que ya usa electricidad por uno nuevo.Puede dejar en blanco las filas que no correspondan).
Answered: 1 Skipped: 4
Ya he cambiado
a
electrodomés...
Planeo cambiar
a
electrodomés...
Planeo cambiar
a
electrodomés...
Planeo cambiar
a
electrodomés...
No estoy
seguro/indeciso
.
9.B.e
Packet Pg. 387 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
9 / 21
100.00%
1 100.00%
1 100.00%
1 1
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Calefacción… Calentamie… Cocina (est…
No planeo
cambiar este
aparato a...
No aplicable
CALEFACCIÓN/ENFRIAMIENTO
(BOMBA DE CALOR)
CALENTAMIENTO
DE AGUA (BOMBA
DE CALOR)
COCINA
(ESTUFA/HORNO)
TOTAL
RESPONDENTS
Ya he cambiado a
electrodomésticos en mi casa.
Planeo cambiar a
electrodomésticos este año.
Planeo cambiar a
electrodomésticos dentro de
los próximos 5 años.
Planeo cambiar a
electrodomésticos, pero
probablemente no durante al
menos 5 años.
No estoy seguro/indeciso.
No planeo cambiar este aparato
a eléctrico en el futuro.
No aplicable
9.B.e
Packet Pg. 388 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
10 / 21
100.00% 1
0.00% 0
0.00% 0
0.00% 0
Q7 ¿Cuál de las siguientes opciones se aplica a usted?
Answered: 1 Skipped: 4
TOTAL 1
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Soy dueño de
una casa en
Healdsburg.
Rento una casa
en Healdsburg.
Soy
propietario de
varias casas...
Otro (por
favor
especifique)
ANSWER CHOICES RESPONSES
Soy dueño de una casa en Healdsburg.
Rento una casa en Healdsburg.
Soy propietario de varias casas en Healdsburg.
Otro (por favor especifique)
9.B.e
Packet Pg. 389 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
11 / 21
Q8 Planea comprar vehículos eléctricos para su negocio en el futuro? Si es así, ¿cuándo?(Seleccione todas las opciones que correspondan. Por ejemplo, si ya tiene un vehículo eléctrico y planea reemplazar otro vehículo a gasolina en el futuro, o si planea reemplazar más de un vehículo con un vehículo eléctrico en el futuro.No cuente el reemplazo de un vehículo eléctrico que ya tiene por uno nuevo.Puede dejar en blanco las filas que no correspondan).
Answered: 0 Skipped: 5
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0
! No matching responses.
VE HÍBRIDO
ENCHUFABLE
VE TOTALMENTE
ELÉCTRICO
TOTAL
RESPONDENTS
Ya tengo vehículos eléctricos para la compañía.
Planeo comprar vehículos eléctricos este año.
Planeo comprar vehículos eléctricos dentro de los próximos 5 años.
Planeo comprar vehículos eléctricos, pero probablemente no durante al menos 5 años.
No estoy seguro/indeciso.
No planeo comprar vehículos eléctricos para la compañía.
No aplicable
9.B.e
Packet Pg. 390 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
12 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
Q9 ¿Planea instalar cargadores de vehículos eléctricos en su negocio, o alentar al propietario? Si es así, ¿cuándo?(Seleccione todas las opciones que correspondan. Por ejemplo, si ya tiene un cargador de vehículos eléctricos y planea instalar otro en el futuro.No cuente el reemplazo de un cargador ya instalado por uno nuevo).
Answered: 0 Skipped: 5
Total Respondents: 0
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
! No matching responses.
ANSWER CHOICES RESPONSES
Ninguna de las anteriores / No aplicable, no planeo instalar cargadores para vehículos eléctricos Ya tengo cargadores de vehículos eléctricos para la compañía Planeo instalar cargadores para vehículos eléctricos este año.
Planeo instalar cargadores para vehículos eléctricos dentro de los próximos 5 años.
Planeo instalar cargadores para vehículos eléctricos, pero probablemente no durante al menos 5 años.
Otro (por favor especifique)
9.B.e
Packet Pg. 391 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
13 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
Q10 ¿Planea instalar energía solar en su negocio, o alentar al propietario? Answered: 0 Skipped: 5
TOTAL 0
! No matching responses.
ANSWER CHOICES RESPONSES
Ya tengo energía solar instalada para la compañía.
Planeo instalar energía solar este año.
Planeo instalar energía solar dentro de los próximos 5 años.
Planeo instalar energía solar, pero probablemente no durante al menos 5 años.
No estoy seguro/indeciso.
No planeo instalar energía solar para la compañía en el futuro.
9.B.e
Packet Pg. 392 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
14 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
Q11 Si ya tiene o planea tener energía solar, ¿incluirá almacenamiento de batería?
Answered: 0 Skipped: 5
TOTAL 0
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
! No matching responses.
ANSWER CHOICES RESPONSES
Ninguna de las anteriores / No aplicable, no planeo instalar energía solar Sí, con batería principalmente como respaldo
Sí, con batería principalmente para evitar picos de precios/tarifas de demanda y exceso de generación No estoy seguro/indeciso
No
Otro (por favor especifique)
9.B.e
Packet Pg. 393 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
15 / 21
Q12 ¿Planea instalar electrodomésticos eficientes en su negocio, o alentar al propietario?(Seleccione todas las opciones que correspondan. Por ejemplo, si planea reemplazar electrodomésticos en diferentes horarios.No cuente el reemplazo de un electrodoméstico que ya usa electricidad por uno nuevo.Puede dejar en blanco las filas que no correspondan).
Answered: 0 Skipped: 5
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
0.00%
0 0.00%
0 0.00%
0 0
! No matching responses.
CALEFACCIÓN/ENFRIAMIENTO
(BOMBA DE CALOR/RTU)
CALENTAMIENTO DE
AGUA (BOMBA DE
CALOR/CALDERA)
COCINA
COMERCIAL
(ESTUFA/HORNO)
TOTAL
RESPONDENTS
Ya he cambiado a
electrodomésticos para la
compañía.
Planeo cambiar a
electrodomésticos este año.
Planeo cambiar a
electrodomésticos dentro de
los próximos 5 años.
Planeo cambiar a
electrodomésticos, pero
probablemente no durante al
menos 5 años.
No estoy seguro/indeciso.
No planeo cambiar este
aparato a eléctrico para la
compañía en el futuro.
No aplicable
9.B.e
Packet Pg. 394 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
16 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
Q13 ¿Cuál de las siguientes opciones se aplica a usted? Answered: 0 Skipped: 5
TOTAL 0
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
! No matching responses.
ANSWER CHOICES RESPONSES
Soy dueño de un edificio comercial en Healdsburg.
Rento un edificio comercial en Healdsburg.
Soy propietario de varios edificios comerciales en Healdsburg.
Otro (por favor especifique)
9.B.e
Packet Pg. 395 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
17 / 21
Q14 ¿Cuáles son los principales factores que influyen en las decisiones sobre sus proyectos energéticos? (Seleccione hasta 3.)
Answered: 1 Skipped: 4
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Ninguna de las
anteriores
Costos
iniciales de
compra (equi...
Costos
continuos
(mantenimien...
Precios de
electricidad y
gas
Créditos
fiscales
federales
Programas
estatales de
reembolso
Programas
locales de
reembolso
Reducción de
carbono
Regulaciones
estatales (por
ejemplo,...
Otro (por
favor
especifique)
9.B.e
Packet Pg. 396 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
18 / 21
0.00% 0
100.00% 1
0.00% 0
100.00% 1
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
Total Respondents: 1
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
ANSWER CHOICES RESPONSES
Ninguna de las anteriores
Costos iniciales de compra (equipo, vehículo, instalación) Costos continuos (mantenimiento, ahorro de costos, facturas, etc.) Precios de electricidad y gas
Créditos fiscales federales
Programas estatales de reembolso
Programas locales de reembolso
Reducción de carbono
Regulaciones estatales (por ejemplo, futuras compras de vehículos nuevos, posibles requisitos futuros de reemplazo de electrodomésticos)
Otro (por favor especifique)
9.B.e
Packet Pg. 397 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
19 / 21
0.00% 0
100.00% 1
0.00% 0
0.00% 0
Q15 ¿Qué idioma se habla predominantemente en su casa?
Answered: 1 Skipped: 4
TOTAL 1
# OTRO (POR FAVOR ESPECIFIQUE) DATE
There are no responses.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Inglés
Español
Prefiero no
responder
Otro (por
favor
especifique)
ANSWER CHOICES RESPONSES
Inglés
Español
Prefiero no responder
Otro (por favor especifique)
9.B.e
Packet Pg. 398 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
20 / 21
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
100.00% 1
Q16 ¿Cual es su grupo de edad?
Answered: 1 Skipped: 4
TOTAL 1
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Menores de 18
18-24
25-44
45-64
65+
Prefiero no
responder
ANSWER CHOICES RESPONSES
Menores de 18
18-24
25-44
45-64
65+
Prefiero no responder
9.B.e
Packet Pg. 399 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting) Encuesta sobre Electrificación en la Comunidad
21 / 21
Q17 Proporcione comentarios adicionales que ayuden al Departamento de Electricidad de Healdsburg a pronosticar el consumo y la demanda de electricidad en el futuro. (Opcional)
Answered: 0 Skipped: 5
# RESPONSES DATE
There are no responses.
9.B.e
Packet Pg. 400 Attachment: Appendix C Community Electrification Survey (4680 : Healdsburg Electrfication Energy and Demand Forecasting)
CITY OF HEALDSBURG
CITY COUNCIL AGENDA STAFF REPORT
MEETING DATE: June 2, 2025
SUBJECT: Appointments of the City Selection Committee and Mayors' and Councilmembers' Association Board of Directors
PREPARED BY: Raina Allan, City Clerk
STRATEGIC INITIATIVE(S):
Provide Effective Governance
RECOMMENDED ACTION(S):
Review letters of interest, direct the Mayor or her Alternate on how to vote at the City Selection Committee and Sonoma County Mayors’ and Councilmembers’ Association Board meeting on June 12, 2025, and authorize the Mayor or her alternate to vote on any late nominations or recommendations that may be received at the City Selection Meeting or Mayors’ and Councilmembers Board meeting.
COMMUNITY ENGAGEMENT/OUTREACH:
Not Applicable.
BACKGROUND:
The City of Healdsburg is a member of the Sonoma County City Selection Committee and the Sonoma County Mayors’ and Councilmembers’ Association. Each member appoints representatives to various regional Boards and Commissions.
DISCUSSION/ANALYSIS:
At the June 12, 2025, meeting, the City Selection Committee and the Mayors’ and Councilmembers’ Board of Directors will be considering filling a vacancy on one board. The vacancy and interested persons are as follows:
Board of Directors Appointments:
1. Association of Bay Area Governments (ABAG) Executive Board - Two Seats (to fill the expiring terms of Susan Adams of Rohnert Park and Stephen Zollman of Sebastopol). 1 primary seat and 1 alternate seat. Two-year term starting in June.
9.C
Packet Pg. 401
Letters Received for Primary Seat: Susan Adams, Rohnert Park and Frank Quint, Petaluma
Letter Received for Alternate Seat: Stephen Zollman, Sebastopol Copies of the letters of interest are attached.
Staff recommends that the City Council authorize the Mayor or her designee to vote on behalf of the City of Healdsburg. It is also recommended that if late nominations are received for the City Selection Committee or Mayors’ and Councilmembers’ Association that the City Council authorize the Mayor or her designated representative, the authority to vote on these late nominations or recommendations at the City Selection Meeting or Mayors’ and Councilmembers’ board meeting.
ENVIRONMENTAL STEWARDSHIP:
Not Applicable.
ALTERNATIVES:
No alternatives are proposed.
FISCAL IMPACT:
There is no fiscal impact related to the proposed action.
ENVIRONMENTAL ANALYSIS:
Pursuant to Title 14, the California Code of Regulations, Section 15378(b)(5) of the California Environmental Quality Act (“CEQA”) guidelines, the proposed action is an administrative activity of the City that will not result in direct or indirect physical changes to the environment.
ATTACHMENT(S):
Letters of Interest
9.C
Packet Pg. 402
130 Avram Avenue Rohnert Park CA 94928 (707) 588-2226 Fax (707) 794-9248 www.rpcity.org
City Council
Gerard Giudice
Mayor
Emily Sanborn
Vice Mayor
Susan Hollingsworth Adams
Jackie Elward
Samantha Rodriguez
Councilmembers
________________
Marcela Piedra
City Manager
Michelle Marchetta Kenyon
City Attorney
Lee Burdick
Assistant City Attorney
Cindy Bagley
Director of Community Services
Jamie Cannon
Director of Human Resources
Vanessa Garrett
Director of Public Works
Alicia Giudice
Director of
Development Services
Sylvia Lopez Cuevas
City Clerk
Tim Mattos
Public Safety Director
Betsy Howze
Finance Director
April 14, 2025
2025 Chair City, City of Rohnert Park
Sonoma County Mayors’ and Councilmembers’ Association
130 Avram Avenue, Rohnert Park, CA 94928
Attn: Lauren Berges, MCA Clerk [email protected]
Re: Request for Reappointment to the Association of Bay Area Governments (ABAG) Executive Board
Honorable Mayors and Councilmembers,
I am writing to respectfully request your support for my reappointment to the Association of Bay Area Governments (ABAG) Executive Board primary seat for a two-year term.
It has been an honor to serve on the ABAG Executive Board since my appointment in February 2021 and to contribute to the vital regional work ABAG leads. Over the past few years, I have also had the privilege of representing our community on the ABAG General Assembly and serving on the Housing Methodology Committee. These roles have deepened my understanding of and commitment to ABAG’s mission to strengthen cooperation and collaboration among local governments to develop innovative and cost-effective solutions to shared regional challenges.
In 2024, I had the honor of serving as Mayor of Rohnert Park. This experience further broadened my perspective on the importance of regional partnerships and informed my contributions to ABAG with a deeper sense of the needs and aspirations of our local communities.
With your support, I look forward to continuing this important work on the Executive Board. Please feel free to contact me at (707) 291-8450 or via email at [email protected] with any questions or to discuss this request further. I appreciate your consideration and your support.
Kind Regards,
Susan H. Adams,
Councilmeber, City of Rohnert Park
Cc: Rohnert Park City Council and City Manager
9.C.a
Packet Pg. 403 Attachment: Letters of Interest (4879 : Mayors and Councilmembers appointments 06.12.2025) Frank Quint
Councilmember District 4
Petaluma, CA 94952
(707) 971-9226
May 3, 2025
2025 Chair City,
City of Rohnert Park
Sonoma County Mayors’ and Councilmembers’ Association
130 Avram Avenue, Rohnert Park, CA 94928
Re: Executive Board of the Association of Bay Area Governments (ABAG) Honorable Mayors and Councilmembers,
I am writing to respectfully request your support for my appointment to the Executive Board of the Association of Bay Area Governments (ABAG). As a passionate advocate for sustainable communities and equitable growth, I am deeply committed to advancing ABAG’s top priorities: securing new revenues for transit operations, promoting housing affordability, and defending clean air and climate standards.
With a background in transportation, I bring a deep understanding of the challenges and opportunities facing our regional transit systems. I have worked extensively to champion active transportation options, improve multimodal connectivity, and support infrastructure investments that create safer, healthier, and more accessible communities. I believe strongly that a resilient and integrated public transit network is foundational to the Bay Area’s economic vitality and environmental future.
My advocacy for affordable housing is grounded in the belief that every Bay Area resident deserves a stable, affordable place to call home. I have actively supported initiatives that expand housing opportunities near transit and jobs, and I am eager to work with fellow regional leaders to pursue new revenue tools and policy solutions that help meet our shared housing goals.
I also share ABAG’s strong commitment to climate action. I support policies that uphold clean air standards and reduce emissions, and I will advocate for investments that build climate resilience while improving public health and quality of life for all communities.
It would be an honor to bring my experience, passion, and collaborative spirit to the ABAG Executive Board. I would be grateful for your support and the opportunity to serve our region during this pivotal time.
I would be honored by your support for this appointment and respectfully ask for your vote. If you have any questions, please do not hesitate to contact me at 707-971-9226 or by email at [email protected] With appreciation,
Frank Quint
Petaluma City Councilmember
cc: Members of Petaluma City Council
9.C.a
Packet Pg. 404 Attachment: Letters of Interest (4879 : Mayors and Councilmembers appointments 06.12.2025) May 5, 2025
Re: Application for ABAG Executive Board Alternate
Position
Chair Giudice, City of Rohnert Park
Sonoma County Mayors’ and Councilmembers’ Association
Attn: Lauren Berges, MCA Clerk
[email protected]
Dear Chair Giudice,
I am excited to be applying for the ABAG Executive Board Alternate position again. I greatly enjoyed my past term and the meetings I attended. I have developed relationships with many other Bay area electeds during this time. Continuing to learn from this position and continuing to develop these relationships will contribute to our association.
My legal experience has contributed to my understanding of how this JPA operates and fulfills its mission of strengthening cooperation and collaboration across local governments to build healthier, stronger communities. Part of this is developing best practices as well as the sharing of resources. One such resource is the available technical assistance related to complying with our required housing elements.
Learning and becoming part of helping ABAG resolve its challenges related to obtaining past CalPers obligations has been very rewarding. Exploring the different ways it is
9.C.a
Packet Pg. 405 Attachment: Letters of Interest (4879 : Mayors and Councilmembers appointments 06.12.2025) 2 attempting to do this, to include the sale of real estate, has been very informative. This ongoing acquired knowledge will also contribute to our association.
I would be honored to continue in this position. As always, if you have questions, please e-mail. Thank you very much for your consideration.
All Best,
signed
Stephen Zollman
Sebastopol Mayor
[email protected]
9.C.a
Packet Pg. 406 Attachment: Letters of Interest (4879 : Mayors and Councilmembers appointments 06.12.2025) 5/28/2025 – Page 1
CITY OF HEALDSBURG
CITY COUNCIL FUTURE AGENDA ITEMS
(NOTE: The schedule is tentative and subject to change pending final publication and posting of the City Council meeting agenda) June 16, 2025 Juneteenth Day Proclamation
Disabilities Pride Month Proclamation
Proclamation Declaring July 2025 as Parks Make Life Better Month in the City of Healdsburg Senior Center Month Proclamation
FY2025-26 Investment Policy
Reach for Home Quarterly Update
Fletcher Studio Contract Amendment - Laura Fish Somersal Park Design Development Speed Limit Reduction Ordinance – 2nd Reading
Villa Chanticleer Lease Amendment - Utilities
Award of Striping and Signing Maintenance Contract
Foley Family Community Pavilion Architectural Construction Administration Services and Geotechnical Observations and Special Inspection and Testing Services Contract Amendments Sonoma County Funding for Community Center Improvements Landscaping and Lighting Assessment District
Weed Abatement Public Hearing
Public Hearing on Staffing Vacancies to Comply with Assembly Bill 2561 Inclusionary Housing Update
Healdsburg Tourism Improvement District (HTID) Annual Report Update Agreements with Development Group, Inc. for City Network Refresh August 4, 2025 Pavement Condition Presentation
Badger Park Redevelopment CEQA and Master Plan Approval Notice of Completion for Recycled Water Pipeline Project
12.1.a
Packet Pg. 407 Attachment: Agenda Planning Sheet (4880 : Future Agenda Items - June 2, 2025) 5/28/2025 – Page 2
August 18, 2025 Women’s Equality Day
Parklet Program Modifications
Update on State Housing Laws Allowing for Additional Housing Title Six Implementation Plan Presentation
(NOTE: The schedule is tentative and subject to change pending final publication and posting of the City Council meeting agenda)
12.1.a
Packet Pg. 408 Attachment: Agenda Planning Sheet (4880 : Future Agenda Items - June 2, 2025)