7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-221
Final EIR
April 2025
Comment O3.14: The comment states that the Draft EIR does not include any analysis regarding the inconsistency of the proposed Project with some of the General Plan goals and policies related to Mixed Use and does not comply with CEQA’s requirements for meaningful disclosure, including the potentially significant impacts.
Response O3.14: The comment is introductory in nature and does not raise a specific issue with the adequacy of the Draft EIR. The Project includes a General Plan Amendment to change the site’s Mixed Use designation to Business Park. Thus, the EIR appropriately evaluates the proposed Project, which is the proposed development and the proposed Business Park General Plan designation that would be consistent with the existing zoning designation. Pursuant to state law, a general plan and zoning designation require consistency and any inconsistency be brought into conformance in a prompt manner. Accordingly, the Applicant is simply seeking compliance with state law to harmonize the land use designations. The proposed General Plan Amendment would result in consistency with the existing zoning and would not result in an environmental effect. Further, a land use designation in and of itself does not constitute a "land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect." It is a designation to provide development standards for projects. Therefore, the Project’s proposed General Plan Amendment does not constitute a conflict with the policies of the General Plan.
Additionally, the Draft EIR does provide an analysis of buildout of the Project site pursuant to the existing Mixed Use Land Use designation. As detailed on page 8-21 of the Draft EIR, implementation of this alternative would bring more occupants and vehicle trips to the Project site that would result in an increase in air quality emissions, energy, and noise.
The Draft EIR also identifies all potentially significant as well as significant and unavoidable impacts in relation to the proposed Project. The reader is referred to Section 1.0 Executive Summary of the DEIR and Chapter 4 MMRP of this Final EIR for a description of the potential impacts and related mitigation.
Comment O3.15: The comment states that the proposed Project would not be consistent with the General Plan and its visions for the Mixed Use Area #4. The comment states that the EIR must be revised to show the inconsistencies with the Land Use District.
Response O3.15: As detailed in the previous response, the EIR appropriately evaluates the proposed Project, which is the proposed development and the proposed Business Park General Plan designation that would be consistent with the existing zoning designation. The proposed General Plan Amendment would result in consistency with the existing zoning. Development assumptions and scenarios presented in the General Plan and its program-level EIR should not be considered a “cap” on permissible acreage or square footage buildout, but simply serve as a framework upon which future project-level environmental analyses may be based. The General Amendment was discussed in the Draft EIR on pages 3-13, 3-35, 5.11-19, and
5.13-6. Potential General Plan inconsistencies that could result in an environmental effect are detailed within Table 5.11-2.
In addition, CEQA case law recognizes that the Lead Agency has the responsibility of determining whether any project is consistent with the lead agencies general plan, “the body which adopted the general plan policies in its legislative capacity has unique competence to interpret those policies when applying them in its adjudicatory capacity.” (Save Our Peninsula Com. v. County of Monterey (2001) 87 Cal.App.4th 99, 142.) Thus, the Lead Agency has decided that the proposed Project is consistent with the policy mentioned in the comment due to the reasons mentioned above.
Comment O3.16: The comment states that the proposed Project is not consistent with General Plan Policy LU
1.12 Flexibility Over Time. The comment explains that the project would exceed the established intensity allowed in the general Plan and increase building square footage by 7%. The comment also states that the
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-222
Final EIR
April 2025
EIR does not analyze the surrounding land use designations and must be revised to show inconsistency with the surrounding area.
Response O3.16: The comment confuses the General Plan Land Use and zoning designations. The site and surrounding areas are zoned for business park and mixed uses. There are different and sometimes inconsistent land use designations. As detailed on Draft EIR page 5.11-21, Building 1 would result in a FAR of 0.47 and Building 2 would result in a FAR of 0.39 which is below the maximum FAR of 0.60 allowed by the Business Park zoning. The General Amendment was discussed in the Draft EIR on page 3-13, 3-35, 5.11- 19, and 5.13-6. As discussed in Section 3.0, Project Description, the proposed Project site has an existing zoning designation of Business Park and pursuant to state law, a general plan and zoning designation require consistency and any inconsistency be brought into conformance in a prompt manner. Accordingly, the Applicant is simply seeking compliance with state law to harmonize the land use designations.
The comment also incorrectly states that there are no other parcels zoned for Business Park uses surrounding the Project site. However, two parcels, one adjacent to the southwest and one across Simpson Road to the northeast of the proposed Project site are each zoned for Business Park uses. In addition, the City of Hemet is a housing rich City. Thus, the inclusion of additional industrial jobs into the City due to employment markets would be consistent with the General Plan Policy mentioned in the comment.
CEQA case law recognizes that the Lead Agency has the responsibility of determining whether any project is consistent with the lead agencies General Plan, “the body which adopted the general plan policies in its legislative capacity has unique competence to interpret those policies when applying them in its adjudicatory capacity.” (Save Our Peninsula Com. v. County of Monterey (2001) 87 Cal.App.4th 99, 142.) Thus, the Lead Agency has decided that the proposed Project is consistent with the Policy mentioned in the comment due to the reasons mentioned above.
Comment O3.17: The comment states that the proposed Project would be inconsistent with General Plan Policy LU 1.13 Build a Strong Community as the Draft EIR does not provide any information of the City’s jobs/housing balance and would have a significant and unavoidable VMT impact.
Response O3.17: The comment incorrectly states that the EIR does not provide any information regarding the City’s job/housing balance. The City’s jobs/housing balance is laid out in Table 5.13-5 in Section 5.13, Population and Housing. Both the table and the analysis within the section illustrate that the City is housing rich. Thus, additional employment from the Project would provide a benefit. As discussed in Section 5.15.7 Cumulative Impacts, while the proposed Project would result in a significant and unavoidable Project specific VMT impact, implementation of the proposed Project would reduce VMT on a City-wide basis due to the City’s current lack of jobs for citizens residing in the area and that the Project would provide employment for local residents. Thus, the Project would not be inconsistent with the General Plan Policy mentioned in the comment and no further response is warranted.
Comment O3.18: The comment states that the proposed Project would be inconsistent with General Plan Goal LU-3 Avoid Land Use Conflict and provide compatible development, as the Project’s proposed business park land use is not compatible with the surrounding mixed uses surrounding the site. The comment states that Mixed Use Area #4 is envisioned to create a residential and retail/business park node and the proposed Project does not align with this vision. The comment also notes that the proposed Project would not be consistent with General Plan Policy LU 2.4, Concentrate Land Uses, as the Project site is located in an isolated part of the city surrounded by rural land.
Response O3.18: As discussed in Section 3.0, Project Description, the proposed Project site has an existing zoning designation of Business Park, and a General Plan Amendment would be required for the site’s General Plan Land Use designation to be consistent with the existing zoning. Approval of the proposed amendment would resolve the inconsistency with the existing Zoning Map. As discussed above, there are two
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-223
Final EIR
April 2025
parcels, one adjacent to the southwest and one across Simpson Road to the Northeast that are each zoned for Business Park uses. In addition, parcels surrounding the Project are currently vacant or used for agricultural purposes. There are currently no proposed projects within the Project vicinity, including within the adjacent parcels which have a Business Park zoning designation and Mixed Use General Plan Land Use designation.
The Project proposes the development of two industrial warehouses on a site that is currently zoned for Business Park uses. The General Plan does not limit light industrial uses to parcels owned by the Metropolitan Water District, as inferred by the comment. In addition, residential land uses are allowed under the mixeduse land use designation but they are not required. Thus, the proposed industrial uses onsite would be consistent with the existing MU land use designation of the site as it is listed as an allowed use. The Project site is zoned for Business Park uses and located adjacent to two truck routes designated by the General Plan and conveniently located in proximity to Highway 74 and Highway 79 and has access to available infrastructure, including roads and utilities to accommodate the growing need for goods movement within southern California. Thus, the Project site is located in a prime location for the proposed industrial uses and is consistent with the smart growth concepts envisioned by the General Plan.
Contrary to the comment’s assumption that the change in land use would increase impacts in comparison to the Project, the Draft EIR provides an analysis of buildout of the Project site pursuant to the existing Mixed Use Land Use designation. As detailed on page 8-21 of Section 8.0, Alternatives of the Draft EIR, implementation of this alternative would result in the same impacts to agriculture and would bring more occupants and vehicle trips to the Project site that would result in an increase in air quality emissions, energy, and noise. Further, development of the site consistent with the existing zoning designation would not result in an incompatible development.
Comment O3.19: The comment states that the EIR does not have meaningful evidence to support its conclusions that there would be a less than significant impact related to a safety hazard or excessive noise within two miles of a public airport. The comment explains that the Project is required to be reviewed by the Riverside County Airport Land Use Commission (RCALUC) after the EIR public Review period, which is deferred mitigation. The comment also notes that the building heights listed in the EIR (60 feet) are different from those in the RCALUC application (52 feet).
Response O3.19: As discussed above in Response O3.10, the proposed Project was approved by the Riverside County Airport Land Use Commission on June 13, 2024. This information has been included in Chapter 3.0, Errata. Thus, the proposed Project would be consistent with the General Plan Policy mentioned in the comment. In addition, the Draft EIR analyzed the proposed Project buildings at a height of 60 feet in order to include the most conservative analysis. In accordance with the Conditions of Approval provided by the RCALUC, any changes to building area or intensity are subject to an amended review to evaluate consistency with the ALUCP compatibility criteria. Thus, this comment does not contain any information requiring further changes to the EIR. No further response is warranted.
Comment O3.20: The comment states that the Draft EIR does not support the conclusions the proposed Project would be consistent with General Plan Policy LU 11.1, Attract New Businesses, as the Draft EIR does not provide any information about the wages of the employees, the tax revenue generated from the Project, or evidence that the unemployed population is qualified or interested in work in the industrial sector.
Response O3.20: This comment does not provide any substantial evidence that the Project would result in a significant environmental impact. CEQA is an environmental protection statute that is concerned with the physical changes to the environment (CEQA Guidelines Section 15358(b)). The environment includes land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance (CEQA Guidelines Section 15360). The project merits, including any economic and social effects of the project are not treated as effects on the environment (CEQA Guidelines Sections 15064(e) and 15131(a)). Therefore, consistent with CEQA, the Draft EIR includes an analysis of the project’s potentially significant physical impacts
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-224
Final EIR
April 2025
on the environment and does not include a discussion of tax revenue or employee wages. Furthermore, CEQA Guidelines Section 15204(a) states that when responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers. Thus, information related to employee wages and tax revenue is not provided.
An analysis of the City’s unemployment rate was discussed in Section 5.13, Population and Housing. The Draft EIR stated “the employees that would fill these roles are anticipated to come from within the City or the region, as the unemployment rate of the City of Hemet as of August 2023 was 6.3%, and the County of Riverside was 5.4% (BLS, 2023). Due to these levels of unemployment, it is anticipated that new employees at the Project site would already reside within commuting distance and would not generate substantial needs for any housing.” Draft EIR page 6-3 describes that most of the new jobs that would be created by the Project would be positions that do not require a specialized workforce, and this type of workforce exists in the City of Hemet and surrounding communities. As discussed in further detail in Section 5.13, Population and Housing, on Table 5.13-4, the transportation and warehousing and utilities industries account for the third largest employment sector within the City of Hemet. Due to existing unemployment and the availability of a workforce, it is anticipated that new jobs that would be generated from Project implementation would be filled by people within the City of Hemet and surrounding communities. Thus, the proposed Project would bring jobs to the community that would be filled by members of the community, consistent with the General Plan Policy mentioned in the comment. No further response is warranted.
Comment O3.21: The comment states that the proposed Project would be inconsistent with General Plan Policy LU 11.9, Consider Industrial Use Locations, because the Project site is located in a prime location and would require a General Plan Amendment. The comment concludes that the revenue or benefits provided to the City is not discussed in the EIR and the Project would result in significant and unavoidable impacts and thus the Project is inconsistent with the Policy.
Response O3.21: The commenter incorrectly equates the use of prime location in the General Plan referring to sensitive sites used in the General Plan with the use in the Draft EIR which describes the Project site. The Project site is located adjacent to two truck routes designated by the General Plan and conveniently located in proximity to Highway 74 and Highway 79 and has access to available infrastructure, including roads and utilities to accommodate the growing need for goods movement within southern California. Thus, the Project site is located in a prime location for the proposed industrial uses that are consistent with the site’s existing Business Park zoning designation. As stated previously, the General Plan Amendment is required for the Project site to be consistent with the site’s Business Park zoning designation.
As described previously, the Draft EIR includes an analysis of the buildout of the Project site pursuant to the existing Mixed Use Land Use designation. As detailed on page 8-21 of Section 8.0, Alternatives of the Draft EIR, implementation of this alternative would result in the same impacts to agriculture and would bring more occupants and vehicle trips to the Project site that would result in an increase in air quality emissions, energy, and noise in comparison to the proposed Project.
Ultimately, it is up to the City to determine what the Project benefits are and if they would outweigh any potential significant and unavoidable impacts. In accordance with CEQA Section 21081(b) and CEQA Guideline Section 15093, in order to approve the Project, the City is required to determine that the unavoidable adverse environmental impacts identified above may be considered acceptable due to specific considerations which outweigh the unavoidable, adverse environmental impacts of the Project. If the City approves a project which will result in the occurrence of significant effects which are identified in the final EIR but are not avoided or substantially lessened, the City shall state in writing the specific reasons to support its action based on the Final EIR and/or other information in the record. This Statement of Overriding Considerations (SOC) shall be supported by substantial evidence in the record. If the City decides to approve the project and makes a SOC, the statement will be included in the record of the project approval and will be mentioned in the notice of determination.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-225
Final EIR
April 2025
Per Public Resources Code § 21002.1 (a), the purpose of an environmental impact report is to identify the significant effects on the environment of a project, to identify alternatives to the project, and to indicate the manner in which those significant effects can be mitigated or avoided.” Therefore, the Draft EIR is not intended to serve as the justification for adopting a SOC or as basis for the approval or denial of the Project, but to disclose the environmental consequences of approving the Project and a SOC. Through the public hearing process, the decision-makers within the City will take into consideration the environmental impacts caused by the Project in if it decides to approve the Project, a SOC will be required.
Comment O3.22: The comment states that the proposed Project would be inconsistent with General Plan Policy C 1.3, Traffic Flow, as implementation of the proposed Project would result in an unsatisfactory service level for 3 intersections, one of which is a Caltrans intersection. The comment states that the paying of fair share for road improvement does not count as mitigation as the improvements associated with the fees are not planned to occur at any certain time.
Response O3.22: As part of the 2019 amendments to the CEQA Guidelines, SB 743 directed that the revised CEQA Guidelines “shall promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses” (Public Resources Code Section 21099[b][1]); and that “automobile delay, as described solely by level of service or similar measures of vehicular capacity or traffic congestion, shall not be considered a significant impact on the environment” (Public Resources Code Section 21099[b][2]). As such, pursuant to Public Resources Code Section 21099(b)(2), the Draft EIR is not required to analyze impacts related to traffic congestion as it shall not be considered an impact on the environment. Thus, Policy C 1.3 does not warrant a consistency analysis related to a potential environmental impact.
The comment states that identification of the Project’s fair share of identified improvements is not adequate if the improvement is not included in an existing DIF/TUMF program. As noted in above, level of service is not considered an environmental impact under CEQA, and therefore any recommended roadway improvements, as well as Project fair-share payments, would not be part of the CEQA process or subject to the mitigation measures or mitigation monitoring as part of the Draft EIR. No further response is required.
Comment O3.23: The comment states that the proposed Project would be inconsistent with General Plan Policy C 4.6, Vehicle Mile Reduction, as the proposed Project would result in a significant and unavoidable VMT impact.
Response O3.23: While the proposed Project would result in a project specific significant and unavoidable VMT impacts, the proposed Project would reduce VMT on a City-wide basis due to the provision of employment for City residents. The Project would include California Air Pollution Control Officers Association (CAPCOA) measures with the goal of reducing VMT in accordance with Senate Bill 375 and CARB, consistent with the General Plan Policy mentioned in the comment. Thus, while the Project would result in a significant and unavoidable impact to Project specific VMT, the Project would be consistent with General Plan Policy O
3.23 in implementing measures to reduce VMT at a Citywide level. No further response warranted.
Comment O3.24: The comment states that the proposed Project fails to comply with the Housing Crisis Act/ Senate Bill (SB) 330/SB 8 as the Project does not provide replacement capacity for the reduced residential development as a result of the proposed Project. The comment supports this by stating the R-4 Zoning district permits the development of 3,199 dwelling units. The comment concludes that the Project must provide 3,199 replacement units elsewhere in the city in accordance with SB 330 and the loss of residential capacity should be included as a finding of significance.
Response O3.24: The commenter erroneously applies the requirements of SB 330 to the proposed Project.
As discussed on page 3-13 of the Draft EIR, the Project site has a zoning of Business Park (B-P) and not R-4.
Thus, there is no residential density assigned to the Project site. The General Plan Amendment is required in
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-226
Final EIR
April 2025
order for the site’s General Plan Designation to be consistent with its existing zoning. As set forth in Government Code Section 65860, a jurisdiction’s zoning ordinance is required to be consistent with the General Plan. As such, the proposed Project would be consistent with the provisions of Government Code Section 65860 and is not required to upzone a different site or identify a replacement housing site pursuant to SB 330. The comment does not contain any information requiring changes to the Draft EIR. No further response is warranted.
Comment O3.25: This comment states that the Draft EIR failed to analyze the construction and operation of replacement housing that is required by SB 330 and thus is piecemealed. The comment concludes by stating that the ERI must analyze the whole of an action and include the analysis of the replacement units.
Response O3.25: As discussed above in Response O3.24, implementation of the proposed Project would not require the construction or operation of replacement sites, therefore they do not need to be included within the CEQA analysis. No further response is warranted.
Comment O3.26: The comment states that the proposed Project must provide a quantified analysis of the Project’s growth compared to the General Plan’s buildout. The comment requests that a revised EIR include an analysis of buildout of the Project and projects “in the pipeline” and their development intensity to determine if they would exceed the projected buildout scenario.
Response O3.26: This comment is a dupicate of Comment O3.11, please see Response O3.11.
Comment O3.27: The comment states that the proposed Project would result in an imbalance of jobs housing by adding additional jobs in a job-rich community.
Response O3.27: The commenter incorrectly states that the projected jobs/housing ratio in the City of Hemet is 2.47 in 2016 and projected to be 2.26 in 2045. As seen in Table 5.13-5 of the Draft EIR, as of 2021, the City of Hemet has a jobs/housing ratio of 0.59 and is projected to have a jobs-housing ratio of 0.75. As stated in Section 5.13, Population and Housing, communities with a jobs-housing ratio of less than 1.19 are considered to be housing rich, thus the proposed Project would help the City reach a better job/housing balance by creating additional jobs in the community.
Comment O3.28: The comment states that the Draft EIR must include a cumulative analysis of the impact of the proposed Project in combination with previous projects since 2016 and projects “in the pipeline” to determine if the Project would result in a cumulative exceedance of employment and population growth forecasts.
Response O3.28: Development assumptions and scenarios presented in the General Plan and its programlevel EIR should not be considered a “cap” on permissible acreage or square footage buildout, but simply serve as a framework upon which future project-level environmental analyses may be based. Cumulative projects, including the Newland Kirby project, are properly included in Table 5-1 of the Draft EIR and accounted for throughout the analysis of the Draft EIR,. All previously constructed projects (i.e., completed prior to issuance of the 2023 Notice of Preparation for the Draft EIR) are considered part of the environmental baseline and have therefore been accounted for as part of the existing conditions.
Growth-inducing potential of a project would be considered significant if it fosters growth or a concentration of population in excess of what is assumed in master plans, land use plans, or in projections made by regional planning agencies, such as SCAG. According to SCAG’s 2020-2045 RTP/SCS population and household growth forecast for Hemet, between 2016 and 2045, SCAG anticipates an employment increase of 18,500 additional jobs (from 21,700 to 40,200), yielding an 85% growth rate. SCAG also anticipates a population increase of 42,500 between 2016 and 2045 (from 81,500 to 124,000). The proposed Project would generate the need for approximately 1,158 employees, which represents approximately 2.72% of the forecasted population growth between 2016 and 2045 and approximately 6.26% of the forecasted
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-227
Final EIR
April 2025
employment growth between 2016 and 2045 for the City. According to the Employment Development Department, as of August 2023, Hemet’s unemployment rate was approximately 6.3%. Additionally, as detailed on Draft EIR page 5.11-21, Building 1 would result in a FAR of 0.47 and Building 2 would result in a FAR of 0.39 which is below the maximum FAR of 0.60 allowed by the Business Park zoning, and related employment projections. Thus, although the Project would generate additional long-term employment in the Project area, the new employment opportunities would be within the forecasted and planned growth of the City.
Comment O3.29: The comment states that the Draft EIR does not provide sufficient evidence to support the claim that the employees are expected to come from within the City or region, and the Draft EIR should be revised to support this claim with evidence of the available workforce and provide a definition for “commuting distance.”
Response O3.29: See previous Response O3.20. Despite the fact that the proposed Project would require a General Plan Amendment, these actions are not considered to be precedent setting actions (defined as any act, decision, or case that serves as a guide or justification for subsequent situations), as they are commonly undertaken on a regular basis by many jurisdictions and relate specifically to the Project site.
Further, as elaborated above and throughout the Draft EIR in Section 5.3, Air Quality, 5.11, Land Use and Planning, and Section 5.13, Population and Housing, the Project would not induce substantial population growth in an area beyond what is forecasted, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure).
Draft EIR page 6-3 describes that most of the new jobs that would be created by the Project would be positions that do not require a specialized workforce, and this type of workforce exists in the City of Hemet and surrounding communities. As discussed in further detail in Section 5.13, Population and Housing, on Table
5.13-4, the transportation and warehousing and utilities industries account for the third largest employment sector within the City of Hemet. Thus, due to existing unemployment and the availability of a workforce, it is anticipated that new jobs that would be generated from Project implementation would be filled by people within the City of Hemet and surrounding communities.
Comment O3.30: The comment states that the proposed Project would be inconsistent with General Plan Policy C 1.3, Traffic Flow, as implementation of the proposed Project would result in an unsatisfactory service level for 3 intersections. The comment states that the paying of fair share for road improvement does not count as mitigation as the improvements associated with the fees are not planned to occur at any certain time. The comment notes that some improvements associated with the fair share fees are listed in the Draft EIR, however some of the recommendations from Appendix N have been excluded and the Draft EIR should be revised to include all traffic improvements recommended in the report.
Response O3.30: As stated above in Response O3.22, SB 743 directed that the revised CEQA Guidelines “shall promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses” (Public Resources Code Section 21099[b][1]); and that “automobile delay, as described solely by level of service or similar measures of vehicular capacity or traffic congestion, shall not be considered a significant impact on the environment” (Public Resources Code Section 21099[b][2]).
As such, pursuant to Public Resources Code Section 21099(b)(2), the Draft EIR is not required to analyze impacts related to traffic congestion, as it does not constitute a potential impact to the environment. Thus, Policy C 1.3 does not warrant a consistency analysis related to potential environmental impacts.
The comment states that identification of the Project’s fair share of identified improvements is not adequate if the improvement is not included in an existing DIF/TUMF program. As noted in above, level of service is not considered an environmental impact under CEQA, and therefore any recommended roadway improvements, as well as Project fair-share payments, would not be part of the CEQA process or subject to the mitigation measures or mitigation monitoring as part of the Draft EIR. No further response is warranted.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-228
Final EIR
April 2025
Comment O3.31: The comment states that the Projects VMT analysis was underestimated as it did not include truck/trailer/delivery van activity. The comment concludes in saying that a revised EIR must be prepared to with a revised VMT analysis to include truck/trailer/and delivery van activity.
Response O3.31: Based on local and State guidance as well as the State CEQA Guidelines Section 15064.3, VMT is an evaluation of passenger cars, not truck trips. The VMT analysis conducted therefore, only analyzed VMT/Employee for home-based-work trips as per the County Guidelines. This is consistent with State CEQA Guidelines Section 15064.3(a) which states “For the purpose of this section, “vehicle miles traveled” refers to the amount and distance of automobile travel attributable to a project.” Here, the term “automobile” refers to on-road passenger vehicles, specifically cars and light trucks. Hence the VMT analysis only includes and represents the impacts of automobile travel as a result of the proposed Project using RIVCOM and is not required to include truck trips as a part of the VMT analysis. Nevertheless, a Traffic Impact Analysis was prepared for the Project and is publicly available on the City’s Project website included as Appendix N to the Draft EIR. The comment does not contain any information requiring changes to the Draft EIR. No further response is warranted.
Comment O3.32: This comment states that the Draft EIR does not adequately analyze the Projects potential impacts regarding hazards due to a geometric design feature. The comment explains that there are areas of overlap between truck movements and an inadequate depiction of the onsite turning radius for truck moving through the site.
Response O3.32: Building 1 would be accessible via Simpson Road from two driveways for trucks and passenger vehicles, each 40 feet in width, and one 26-foot-wide driveway for passenger vehicles. Internal circulation would be provided by 26-foot to 40-foot drive aisles. Building 2 would be accessible via Simpson Road from a 40-foot-wide driveway for trucks and passenger vehicles and 26-foot-wide driveway for passenger vehicles. Internal circulation would be provided by 26-foot to 70-foot drive aisles. Access to the proposed trailer parking lot beyond Warren Road to the east would be via Simpson Road from a 40-foot driveway. The proposed trailer parking lot would include 70-foot-wide drive aisles. There are no unique bends or obstacles along Simpson Road and Warren Road. The onsite circulation design provides truck accessibility and turning ability throughout the site. Therefore, there is no geometric design feature that would prevent trucks or result in impacts from trucks accessing the site. In addition, the plans provided in the Draft EIR are conceptual plans. Should the Project be approved, design level civil engineering plans would be prepared and reviewed by the City’s engineering staff prior to issuance of construction related permitting to ensure that all applicable turning and access standards are met, which include both California Fire Code and California Building Code requirements, as included in the City’s Municipal Code (Sections14-75 and 14- 40).
Comment O3.33: The comment states that the Draft EIR is deterring analysis by stating that development plans would be reviewed by the Hemet Fire Protection District prior to approval. The comment concludes that the Draft EIR should be revised to include the HFPD determination/review of the Project site.
Response O3.33: Figure 3-7, Proposed Conceptual Site Plan, of the Draft EIR, depicts emergency vehicle access to the site. As detailed in Section 3.0, Project Description, the proposed Project would provide emergency access to the site from six driveways located along Simpson Road. Building 1 would be accessible via Simpson Road from two driveways for trucks and passenger vehicles, each 40 feet in width, and one 26- foot-wide driveway for passenger vehicles. Internal circulation would be provided by 26-foot to 40-foot drive aisles. Building 2 would be accessible via Simpson Road from a 40-foot-wide driveway for trucks and passenger vehicles and 26-foot-wide driveway for passenger vehicles. As detailed in Response O1.32, the proposed onsite conceptual circulation design provides emergency vehicle accessibility and turning ability throughout the site and does not identify potential significant environmental impacts. Should the Project be approved, design level civil engineering plans would be prepared and reviewed by the City’s engineering staff prior to issuance of construction related permitting to ensure that all applicable emergency access
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-229
Final EIR
April 2025
standards are met, which include both California Fire Code and California Building Code requirements, as included in the City’s Municipal Code (Sections 14-75 and 14-40). This is not a deferral of analysis, but the City’s standard development review and permitting process to ensure that all applicable design requirements are met, including emergency access.
Comment O3.34: This comment states that the Project has not provided any analysis of horizontal and vertical sight distance at the intersection of Project driveways and adjacent streets.
Response O3.34: Issues related to horizontal and vertical sight distance are design level civil engineering issues that are to be verified by the City’s engineering division during permitting of development projects and are regulated by the California Fire and Building Codes, which are included in the City’s Municipal Code as detailed previously. As detailed on Figure 3-7, Proposed Conceptual Site Plan, the proposed Project would include a landscape setback of approximately 20 feet along the northern border of the site along Simpson Road, building setbacks of approximately 185 feet from the east and west property lines, a landscape setback of approximately 20 feet along the western property line, and a landscape setback of approximately 5 feet along the southern property line. This proposed conceptual design does not identify potential significant environmental impacts. The City’s traffic engineering division would review and approve plans prior to issuance of construction-related permitting to ensure that all applicable sight distance standards are met. Thus, potential impacts related to geometric designs that involve site distance would not occur.
Comment O3.35: The comment states that the Draft EIR must include a cumulative analysis of the impact of the proposed Project in combination with previous projects since 2016 and projects “in the pipeline” to determine if the Project would result in a cumulative exceedance of employment and population growth forecasts. The comment also states that since there is no known tenant for the proposed buildings, there is no assurance that the new jobs associated with the Project would not require a specialized workforce, and a finding of significance must be made.
Response O3.35: Development assumptions and scenarios presented in the General Plan and its programlevel EIR should not be considered a “cap” on permissible acreage or square footage buildout, but simply serve as a framework upon which future project-level environmental analyses may be based. Cumulative projects are properly included in Table 5-1 of the Draft EIR and accounted for throughout the analysis of the Draft EIR, including the Newland Kirby project. All previously constructed projects (i.e., completed prior to issuance of the 2023 Notice of Preparation for the Draft EIR) are considered part of the environmental baseline and have therefore been accounted for as part of the existing conditions.
Growth-inducing potential of a project would be considered significant if it fosters growth or a concentration of population in excess of what is assumed in master plans, land use plans, or in projections made by regional planning agencies, such as SCAG. According to SCAG’s 2020-2045 RTP/SCS population and household growth forecast for Hemet, between 2016 and 2045, SCAG anticipates an employment increase of 18,500 additional jobs (from 21,700 to 40,200), yielding a 85% growth rate. SCAG also anticipates a population increase of 42,500 between 2016 and 2045 (from 81,500 to 124,000). The proposed Project would generate the need for approximately 1,158 employees, which represents approximately 2.72% of the forecasted population growth between 2016 and 2045 and approximately 6.26% of the forecasted employment growth between 2016 and 2045 for the City. According to the Employment Development Department, as of August 2023, the City of Hemet’s unemployment rate was approximately 6.3%. As discussed in further detail in Section 5.13, Population and Housing, on Table 5.13-4, the transportation and warehousing and utilities industries account for the third largest employment sector within the City of Hemet.
Additionally, as detailed on Draft EIR page 5.11-21, Building 1 would result in a FAR of 0.47 and Building 2 would result in a FAR of 0.39 which is below the maximum FAR of 0.60 allowed by the Business Park zoning, and related employment projections. Thus, although the Project would generate additional long-term
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-230
Final EIR
April 2025
employment in the Project area, the new employment opportunities would be within the forecasted and planned growth of the City.
Comment O3.36: The comment states that the proposed Project must provide a quantified analysis of the Project’s growth compared to the General Plan’s buildout. The comment requests that a revised EIR include an analysis of buildout of the Project and projects “in the pipeline” and their development intensity to determine if they would exceed the projected buildout scenario.
Response O3.36: This comment is a dupicate of Comment O3.11, please see Response O3.11.
Comment O3.37: The comment states that the Draft EIR must be revised to include a Significant and Unavoidable impact for the removal of the Mixed Use land use designation for the purpose of avoiding or mitigating an environmental effect.
Response O3.37: This comment is conclusive in nature and does not provide any substantial evidence that the Project would result in a new significant environmental impact. Despite the fact that the proposed Project would require a General Plan Amendment, these actions are not considered to be precedent setting actions (defined as any act, decision, or case that serves as a guide or justification for subsequent situations), as they are commonly undertaken on a regular basis by many jurisdictions and relate specifically to a particular Project site. The Project includes a General Plan Amendment to change the site’s Mixed Use designation to Business park; however, a land use designation in and of itself does not constitute a "land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect." It is a designation to provide development standards for projects. Therefore, the Project’s proposed General Plan Amendment does not constitute a conflict with the policies of the General Plan. Significant and unavoidable impacts under the proposed Project are only related to agriculture, noise, greenhouse gas emissions, and transportation and are disclosed in the Draft EIR. As described previously, the Draft EIR includes an analysis of the buildout of the Project site pursuant to the existing Mixed Use land use designation. As detailed on page 8-21 of the Draft EIR, buildout of the existing Mixed Use land use designation would result in the same impacts to agriculture and would bring more occupants and vehicle trips to the Project site that would result in an increase in air quality emissions, energy, and noise in comparison to the proposed Project.
Comment O3.38: The comment states that a revised Draft EIR must be completed that includes an alternative that evaluate an alternative that meets the Projects objectives and eliminates all the Project’s significant and unavoidable impacts. The comment also states that the Draft EIR must also be revised to provide a quantitative analysis of the alternatives for impacts such as GHG.
Response O3.38: The Draft EIR included a comprehensive analysis of Project Alternatives as required by CEQA Guidelines Section 15126.6. The “range of alternatives” to be evaluated is governed by the “rule of reason” and feasibility, which requires the EIR to set forth only those alternatives that are feasible and necessary to permit an informed and reasoned choice by the Lead Agency and to foster meaningful public participation (CEQA Guidelines Section 15126.6(f)). Additionally, State CEQA Guidelines Section 15126.6(b) emphasizes that the selection of project alternatives be based primarily on the ability to reduce impacts relative to the proposed project.
As detailed in Draft EIR Section 8.0, Alternatives, the proposed Project is consistent with the current zoning of the site and would result in significant and unavoidable impacts related to agriculture, greenhouse gas emissions, noise and transportation. One alternative (Alternate Site Alternative) was considered but rejected due to its infeasibility and lack of ability to meaningfully reduce Project impacts while meeting Project objectives. Instead, a No Project/ No Development Alternative, a Reduced Project alternative, and a No Project/ Buildout of Existing Land Use Alternative. As such, the alternatives utilized by the EIR provide a reasonable range of alternatives pursuant to CEQA Guidelines Section 15126.6.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-231
Final EIR
April 2025
Draft EIR Page 8-1 states that a pursuant to State CEQA Guidelines Section 15126.6(d), discussion of each alternative presented in this Draft EIR section is intended “to allow meaningful evaluation, analysis, and comparison with the proposed project.” As permitted by CEQA, the significant effects of each alternative are discussed in less detail than those of the proposed Project, but in enough detail to provide perspective and allow for a reasoned choice among alternatives to the proposed Project. The qualitative analysis provided is sufficient to support the impacts claims.
As shown on Table 8-1, Alternative 2 is expected to generate approximately 479 daily trips, compared to the proposed Projects 2,539. Since trips are calculated based on building square footage, an 81% decrease in building area with the same proposed use would result in an 81% decrease in trips. Given that a majority of GHG emissions are from mobile emissions, it is expected that this reduction would be greatly reduced compared to the proposed Project.
Comment O3.39: This comment states that GSEJA believes the EIR is flawed and must be revised and recirculated for public review. GSEJA also requests to be added to the public interest list for the proposed Project.
Response O3.39: The comment is conclusionary in nature and as stated above GSEJA will be added to the public interest list for the proposed Project. As substantiated by the previous responses above and below, none of the conditions arise which would require recirculation of the Draft EIR pursuant to CEQA Guidelines Section 15088.5. Therefore, no further response is warranted.
Comment O3.40: This comment states that SWAPE has reviewed the Draft EIR and states that the EIR fails to adequately evaluate the air quality, health risk, and greenhouse gas impacts and suggests that a revised EIR be prepared.
Response O3.40: This comment is introductory in nature and introduces the inadequacies of the Draft EIR that will be further discussed within the comment. Because the comment does not raise any specific concerns with the adequacy of the Draft EIR or raise any other CEQA issue. Thus, no further response is warranted.
Comment O3.41: The comment states that since the Project site is located on a site that has historically been used for agricultural purposes, a revised EIR including soil sampling for residual concentrations of pesticides must be included.
Response O3.41: As detailed by the comment, the Phase I Environmental Site Assessment prepared for the site did not identify any evidence of excessive pesticide use and concentrations were recorded below regulatory levels and background concentrations. This comment does not provide any substantial evidence that the Project would result in a significant environmental impact. Section 152049(c) of the CEQA Guidelines advises that comments should be accompanied by factual support, stating “[r]eviewers should explain the basis for their comments and should submit data or references offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in support of the comments. Pursuant to Section 15064, an effect shall not be considered significant in the absence of substantial evidence.” Where comments provide no facts or other substantial evidence to support an assertion, or where comments do not explain why the evidence supporting a conclusion in the Draft EIR is not substantial evidence, the Final EIR is not required to alter a significance determination of the Draft EIR. While CEQA permits disagreements of opinion with respect to environmental issues addressed in the EIR (see Section 15151 of the CEQA Guidelines [“disagreement among experts does not make an EIR inadequate… the courts have looked not for perfection but for adequacy, completeness, and a good faith effort at full disclosure”].) The Draft EIR for the proposed Project provides an adequate, complete, and good faith effort at full disclosure of the physical environmental impacts of the proposed Project and the conclusions are based upon substantial evidence in light of the whole record. Thus, no further response is warranted.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-232
Final EIR
April 2025
Comment O3.42: This comment states that the CalEEMod default data was changed for modeling of the proposed Project and that CEQA requires such changes be justified by substantial evidence. The comment states that when default values in the program are changed, output files are produced which disclose to the reader which values within the program have been changed.
Response O3.42: The comment is informational in nature and does not raise any specific concerns with the adequacy of the Draft EIR or raise any other specific CEQA issue. It is typical in the modelling method, that default CalEEMod data is revised, so that the modeling accurately depicts construction and/or operation of each proposed Project. No revisions per this comment are required and no further response is warranted..
Comment O3.43: This comment states that CalEEMod provides recommended default values based on sitespecific information and that the user can change the default values and input project-specific values, but CEQA requires that such changes be justified by substantial evidence. The comment states that once all of the values are inputted into the model, the project’s construction and operational emissions are calculated, and “output files” are generated that disclose what parameters are utilized in calculating the project’s air pollutant emissions and make known which default values are changed as well as provide justification for the values selected. The comment claims that CalEEMod version 2022.1 is relied upon to estimate project emissions, which poses a problem as the currently available version of CalEEMod 2022.1 is described as a “soft release” which fails to provide complete output files. Further, the comment states that the “User Changes to Default Data” table no longer provides the quantitative counterparts to the changes to the default values and that previous CalEEMod Versions, such as 2020.4.0, include the specific numeric changes to the model’s default values. The commenter claims that to remedy this issue, the Draft EIR should have provided access to the model’s “.JSON” output files, which allow third parties to review the model’s revised input parameters.
Response O3.43: The commenter is incorrect that CalEEMod 2022.1 is a “soft release.” As indicated in the CalEEMod release notes, CalEEMod version 2022.1 was approved for full launch on 12/21/2022 and the “soft release” message was removed.2 As such, CalEEMod version 2022.1 is appropriate for use and the analysis is adequate as presented.
In addition, as discussed on pages 10 and 11 of the CalEEMod User’s Guide for CalEEMod version 2022.1, CalEEMod was designed to allow the user to change the defaults to reflect site- or project-specific information when available. Thus, modifications to CalEEMod defaults are used when more detailed information is known about a project such as the construction timeline and the mix of equipment use.
Modifications made to the CalEEMod defaults as a part of this Project were done in order to provide an accurate snapshot of the Project’s construction and operational details. Modifications to defaults and the explanations are noted in the output report. Pages 43 of the CalEEMod outputs (Appendix 3.1 of the Air Quality Impact Analysis) identifies the user changes that were made CalEEMod. The “.JSON” files are input files, not output files. As such, all output files were included in Appendix 3.1 of the Air Quality Impact Analysis.
Comment O3.44: The comment states that the comments discovered inconsistencies between the model inputs and the information within the Draft EIR, thus a revised Draft EIR must be prepared to include an updated air quality analysis.
Response O3.44: The comment does not raise any specific concerns with the adequacy of the Draft EIR or raise any other CEQA issue. As discussed throughout these responses and the Air Quality Report and Health Risk Analysis (Appendix C and D of the Draft EIR), the Project was properly modeled and analyzed and the 2 California Air Pollution Control Officers Association (CAPCOA). Release Notes. Retrieved September 2022 from https://www.caleemod.com/release-notes
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-233
Final EIR
April 2025
proposed Project would not result in potentially significant air quality or health risk impacts. No further response is warranted.
Comment O3.45: The comment states that since there are no known tenants for the proposed buildings, the modeling should include refrigerated warehouse space, which would result in increased emissions or provide substantial evidence for not including cold storage in the analysis.
Response O3.45: As identified on page 3-33 of Section 3.0, Project Description Draft EIR, the building is not designed to accommodate and would not include any warehouse cold storage or refrigerated uses. As such, cold storage is not included as part of this Project. Additionally, the Project would be conditioned to prohibit future cold storage uses. Should the Project later be modified to propose cold storage, the analysis would be revised under subsequent CEQA evaluation to evaluate the Project change, including air toxic emissions and health impacts from cold storage and TRUs.
Comment O3.46: The comment states that the CalEEMod output files show unsubstantiated changes to the default operational vehicle fleet mix, and they must be revised to show the percentages used to calculate the Project’s operational emissions.
Response O3.46: This comment does not provide any substantial evidence that the Project would result in a significant environmental impact. Section 152049(c) of the CEQA Guidelines advises that comments should be accompanied by factual support, stating “[r]eviewers should explain the basis for their comments and should submit data or references offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in support of the comments. Pursuant to Section 15064, an effect shall not be considered significant in the absence of substantial evidence.” Where comments provide no facts or other substantial evidence to support an assertion, or where comments do not explain why the evidence supporting a conclusion in the Draft EIR is not substantial evidence, the Final EIR is not required to alter a significance determination of the Draft EIR. While CEQA permits disagreements of opinion with respect to environmental issues addressed in the EIR (see Section 15151 of the CEQA Guidelines [“disagreement among experts does not make an EIR inadequate . . . the courts have looked not for perfection but for adequacy, completeness, and a good faith effort at full disclosure”].) The Draft EIR for the proposed Project provides an adequate, complete, and good faith effort at full disclosure of the physical environmental impacts of the proposed project and the conclusions are based upon substantial evidence in light of the whole record.
As discussed on page 34 of Appendix 3.2 of the Air Quality Impact Analysis (Appendix B of the Draft EIR), trip generation rates used in CalEEMod for the Project were based on the Project’s VMT Analysis (Appendix O of the Draft EIR), which identifies that the proposed Project would generate approximately 2,539 average daily trips, including 2,087 passenger vehicle trips, 96 two-axle truck trips, 61 three-axle truck trips, 33 four-axle truck trips, and 259 five+-axle truck trips.
Therefore, the modeling is conservative as it increases the percentage of medium duty truck trips from the default 1.73% to 2.5% and increases the percentage of heavy heavy duty (HHD) truck trips from the default of 1.76% to assume 11.50% consistent with the VMT Analysis prepared for the proposed Project. As such, the commenter is incorrect that the modeling included unsubstantiated changes that may underestimate the Project’s mobile source emissions. Therefore, no further response is warranted.
Comment O3.47: This comment states that the commenter prepared an updated CalEEMod model, using the Project-specific information provided by the Draft EIR, omitting the changes to operational fleet mixes and states that NOx emissions would increase by approximately 27.4% and exceed the applicable significance threshold resulting in a potentially significant air quality impact that was not previously identified or addressed in the Draft EIR.
Response O3.47: The comment does not raise any specific concerns with the adequacy of the Draft EIR or raise any other issue related to requirements under State CEQA Guidelines. As discussed throughout
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-234
Final EIR
April 2025
responses O3.40 to O3.46, and the Air Quality Report and Health Risk Analysis (Appendix C and D of the Draft EIR), the Project has been properly modeled and analyzed and the analysis has determined that the proposed Project would not result in potentially significant air quality or health risk impacts. The modeling provided by the comment included default operational fleet mix values that are not specific to the proposed Project as determined by the Lead Agency. As these values do not represent the Project, the increased emissions that result from them are also not applicable. No further response is warranted.
Comment O3.48: This comment states that the less than significant health risk impact based on the Mobile Health Risk Assessment in Appendix D to the Draft EIR is incorrect based off two reasons.
Response O3.48: The comment is introductory in nature and does not identify the specific issue with the adequacy of the Draft EIR. Because the comment does not express the specific concern or question regarding the adequacy of the Draft EIR, no further response is warranted.
Comment O3.49: This comment states that the first reason the Health Risk Assessment is flawed is that it relies upon a flawed air model based on the comments mentioned above (in Comment O3.46) and thus should not be relied upon.
Response O3.49: Refer to Response O3.46. As discussed throughout these responses, and the Air Quality Report and Health Risk Analysis (Appendix C and D of the Draft EIR), the Project was properly modeled and analyzed, and the proposed Project would not result in potentially significant air quality or health risk impacts. No further response is warranted.
Comment O3.50: This comment states that the Draft EIR underestimates the exposure assumptions for fraction of time at home.
Response O3.50: As detailed in Section 5.3, Air Quality, of the Draft EIR, the HRA that was completed for the Project provides the appropriate conservative analysis pursuant to SCAQMD, CARB, and OEHHA recommended methodology. Per OEHHA methodology, the HRA included refinements to identify potential effects to smaller human body weights and breathing rates to assess risk to children, which was done as detailed in the methodology provided on page 22 and 23 of the HRA (Appendix D of the Draft EIR). In addition, the HRA provides a conservative analysis by evaluating the closest receptors with the maximum potential emissions and continuous exposure (24-hours per day). Thus, stringent significance thresholds and methodology that is consistent with resource agency direction was utilized in the Draft EIR to determine potential impacts to residents and school children, which determined that impacts would be less than significant, and mitigation is not required. The thresholds utilized were based on the City’s discretion (as Lead Agency) and are supported by substantial evidence from SCAQMD, CARB, and OEHHA.
Comment O3.51: This comment states that the Draft EIR fails to implement all feasible mitigation measures related to the Projects significant and unavoidable impacts related to NOx emissions and provides a list of mitigation measures found in the 2020 SCAG RTP/SCS Program EIR and the Department of Justice that incorporate feasible ways to include lower-emitting design features into the Project.
Response O3.51: As discussed throughout these responses, and the Air Quality Report and Health Risk Analysis (Appendix C and D of the Draft EIR), the Project was properly modeled and analyzed and the proposed Project would not result in significant air quality or health risk impacts with implementation of identified mitigation. Significant and unavoidable impacts related to NOx would not occur. Thus, there is no nexus to provide additional mitigation measures such as limiting the amount of grading surface area to reduce NOx emissions. Thus, no further response is warranted.
Comment O3.52: This comment states that the commenter has received limited discovery regarding the Project, additional information may become available in the future; and the commentor retains the right to revise or amend this report when additional information becomes available.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-235
Final EIR
April 2025
Response O3.52: This comment is advisory in nature and disclaims that the commenter has the right to revise the report as additional information becomes available. The comment does not raise any specific concerns with the adequacy of the Draft EIR or raise any other CEQA issue. Therefore, no further response is warranted.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-236
Final EIR
April 2025
Letter O4: Golden State Environmental Justice Alliance (1 page)
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-237
Final EIR
April 2025
Response to Letter O4: Golden State Environmental Justice Alliance, dated June 28, 2024 Comment O4.1: This comment states that Golden State Environmental Justice Alliance would like to be added to the notification list regarding any subsequent environmental documents, public notices, public hearings, and notices of determination for the Project. The comment included eight email addresses and one mailing address.
Response O4.1: Golden State Environmental Justice Alliance will be added to the notification list and provided future notices for the Project and Hearings. Because the comment does not express any specific concern or question regarding the adequacy of the Draft EIR, no further response is warranted.
7.A.
Newland Simpson Road Project 2.0 Response to Comments
City of Hemet 2-238
Final EIR
April 2025
This page intentionally left blank.
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-1
Final EIR
April 2025
3. Revisions to the Draft EIR
This section contains revisions to the Draft EIR based on: (1) clarifications required to prepare a response to a specific comment; and/or (2) typographical errors. The revisions do not alter any of the significance conclusions that were previously disclosed in the Draft EIR. Changes made to the Draft EIR are identified here in strikeout text to indicate deletions and in bold and double underlined text to indicate additions.
3.1 REVISIONS IN RESPONSE TO WRITTEN COMMENTS AND CITY
CHANGES TO TEXT
The following text, organized by Draft EIR Chapters and Sections, have been revised based on response to comments received on the Draft EIR and corrections identified by the City of Hemet.
Chapter 3.0, Project Description
The second paragraph on page 3-16, in Section 3.0, Project Description, is revised as follows:
The proposed Project would include approximately 483,977 SF (or 11.11 acres) of landscaping that would cover about 24.5-percent of the Project site. Proposed landscaping would include 24-inch box and 15-gallon trees along with various shrubs, and groundcover to screen the proposed buildings, parking, and loading areas from off-site viewpoints. Landscaping would be provided along the perimeter of each building and throughout the parking areas and site boundaries as shown in Figure 3-10, Conceptual Landscape Plan. The Project would also include lighting throughout the parking areas, which would be hooded or oriented away from the property boundaries pursuant to City of Hemet Municipal Code Section 90-1046(e).
The Project would include fencing surrounding proposed buildings and the truck trailer lot, and a six-foothigh concrete screen wall along the western property line.
Chapter 5.1, Aesthetics
The first paragraph on page 5.1-8, in Section 5.1, Aesthetics, is revised as follows:
The Project would develop two industrial warehouse buildings that would be approximately 60-feet tall and would be set back from the adjacent streets so as not to encroach into the existing public long-distance views.
The proposed Project has a minimum landscaped setback of 30-feet along Simpson Road and 20 feet from Warren Road, building setbacks of approximately 185-feet from the east and west property lines, and a landscape setback of approximately 10-feet along the southern property line. The building setbacks would ensure that public views along the nearby roads would not be impacted, and landscaping would ensure that views of the site would be broken up and avoid monotonous views of the large walls of the buildings. In addition, the Project would also install a 12-foot-wide sidewalk on all Project frontages on Warren Road and Simpson Road. The proposed Project’s six-foot-high concrete wall along the western property line would be perpendicular to any public views facing south on Simpson Road and would therefore not interfere with any long-range views. The building height, massing, setbacks, new sidewalks and layered landscaping along Simpson Road and Warren would ensure that public views of the Domenigoni Mountains remain visible to vehicles and pedestrians traveling along Warren Road and Simpson Road, as shown in Figure 5.1-1.
Chapter 5.6, Energy
The first listed reference on page 5.6-14, in Section 5.6, Energy, is revised as follows:
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-2
Final EIR
April 2025
California Energy Commission. (Updated December 23, 2022). 2022 Title 24 Building Energy Standards.
Retrieved December 4, 2023 from https://www.energy.ca.gov/programs-andtopics/programs/building-energy-efficiency-standards/2022-building-energy-efficiency https://www.energy.ca.gov/sites/default/files/2022-08/CEC-400-2022-010_CMF.pdf Chapter 5.7, Geology and Soils
Paragraph 2 from Mitigation Measure PAL-1: Paleontological Monitoring on Page 5.7-14, in Section 5.7, Geology and Soils, is revised as follows:
The PRIMP shall also require that in areas mapped as late to middle Pleistocene old alluvial fan deposits, monitoring will shall be conducted full-time in undisturbed alluvium starting at the surface. In areas mapped as Holocene to late Pleistocene young alluvial valley deposits, monitoring shall be conducted full-time in undisturbed alluvium starting at a depth of five feet below the surface during grading or excavation activities. In the event paleontological resources are encountered, ground disturbing activity within 50 feet of the area shall cease. The paleontologist shall examine the materials encountered, assess the nature and extent of the find, and recommend a course of action to further investigate and protect or recover and salvage those resources that have been encountered pursuant to the guidelines of the Society of Vertebrate Paleontology (SVP, 2010).
Chapter 5.8, Greenhouse Gas Emissions
Mitigation Measure GHG-7 on page 5.8-18, in Section 5.8, Greenhouse Gas Emissions, is revised as follows:
Prior to issuance of an occupancy permit, the City shall confirm that the Applicant has fully funded signs to be clearly identifying approved truck routes have been installed on Simpson Road and Warren Road to clearly identify approved truck routes.
Mitigation Measure GHG-10 on page 5.8-18, in Section 5.8, Greenhouse Gas Emissions, is revised as follows:
Prior to tenant occupancy for each building/occupancy, issuance of a Certificate of Occupancy for each building/occupancy providing for 250 or more employees, each owner/tenant shall develop a use/occupant-specific transportation demand management (TDM) program. The TDM program shall be submitted to the City Planning Division and City Building & Safety Division for review and approval as part of tenant improvements plan(s) documentation. Recommended California Air Pollution Control Officers Association (CAPCOA) TDM program elements are listed below:
• Provide pedestrian and bicycle network improvements within the development connecting to existing offsite facilities. • Where applicable ensure design of key intersections and roadways encourage the use of walking, biking and where applicable transit.
• Commute trip reduction (CTR) programs offered to encourage the use of vanpools, carpooling, public transit, and biking.
• Provide CTR program marketing including information sharing and marketing to promote and educate employees about their travel choices to the employment location. • CTR programs may also provide for alternative work or compressed work schedules to reduce the number of days an employee commutes to work.
• Provision of on-site facilities to provide end of trip services for bicycling such as secure bike parking and storage lockers.
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-3
Final EIR
April 2025
• Provide reserved preferential parking spaces for car-share, carpool, and ultra-low or zero emission vehicles.
Chapter 5.9, Hazards and Hazardous Materials
Due to the nature of the required City approvals (i.e., the proposed General Plan Amendment), the City of Hemet is required, pursuant to Public Utilities Code Section 21676, to refer the proposed Project to the ALUC for ALUC review. On June 13, 2024, the proposed Project was found to be consistent with the 2017 Hemet-Ryan Airport Land Use Compatibility Plan by RCALUC. The proposed Project would comply with this ALUC notification and all other applicable rules and regulations as they pertain to the Hemet-Ryan Airport and airport safety. Overall, because the proposed Project is not located within compatibility zones A through D of the Hemet-Ryan Land Use Compatibility Plan or the designated Hemet-Ryan Airport noise contours; and it would not result in hazards related to excessive glare, light, steam, smoke, dust, or electronic interference, the proposed Project would not introduce a safety hazard associated with airport operations for people residing, working, and visiting the Project site.
Chapter 5.10, Hydrology and Water Quality
FEMA (Federal Emergency Management Agency). (October 2020). Flood Insurance Rate Map (FIRM) 06065C1430H. https://hazards-fema.maps.arcgis.com/apps/webappviewer/ index. html?id = 8b0adb51996444d4879338b5529aa9cd.
https://www.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338b55 29aa9cd
Chapter 5.12, Noise
PDF NOI-1, on page 5.12-36, Section 5.12, Noise, is revised as follows:
All construction activities shall comply with HMC Section 30-32[a][43], restricting construction activities to the approved hours of construction as set forth on a permit or other city entitlement as issued by the City’s building official, Pplanning Ccommission, or Ccity Ccouncil, or as otherwise prohibited by the Hemet Building Code.
Chapter 5.13, Population and Housing
The follow references on page 5.13-9 in Section 5.13, Population and Housing, are revised as follows:
BLS (U.S. Bureau of Labor Statistics). August 2023. BLS Data Viewer. Retrieved August 2023 from:
https://beta.bls.gov/dataQuery/search https://www.bls.gov/data/home.htm# City of Hemet. January 2012. General Plan 2030. Retrieved October 2023 from:
https://www.hemetca.gov/534/Final-General-Plan-2030
DOF (California Department of Finance). May 2023. E-5 Population and Housing Estimates for Cities, Counties, and the State, January 2021- 2024 2023, with 2020 Benchmark. Retrieved October 2023 from: https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housingestimates-for-cities-counties-and-the-state-2020-2023/. https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housingestimates-for-cities-counties-and-the-state-2020-2024/
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-4
Final EIR
April 2025
Chapter 5.15, Transportation
Table 5.15-1: Existing Roadway Characteristics within project Aera, in Section 5.15, Transportation, is revised as follows:
Table 5.15-1: Existing Roadway Characteristics within Project Area Roadway Classification1 Direction
Existing
Travel
Lanes
Median
Type2 Speed Limit
SR 79 Expressway North-South 24 NM, TWLTL Varies from
35 to 5550
SR 74 Expressway East-West 42 NM 5540
Warren Road Arterial 6D
Divided Secondary-B 4D
East-West
North-South 2 TWLTL 5545
Simpson Road Secondary 4U East-West 2 NM 5040
Domenigoni
Parkway Arterial 6D North-South 42 NM 6525
Stetson Avenue Collector 2U
East-West
North-South 2 NM 3035
Mustang Way Interstate Freeway
Secondary 4U
East-West
North-South 46 NM 3565
Table 5.15-6: Project Completion Conditions Peak Hour Levels of Service, in Section 5.15, Transportation, is revised as follows:
Table 5.15-2: Project Completion Conditions Peak Hour Levels of Service AM Peak PM Peak
Intersection Control Type Delay LOS Delay LOS
1. SR 79/SR 74 Signal 36.3 D 50.8 D
2. SR 79/Simpson Rd Signal 27.0 C 21.7 C
3. SR 79/Domenigoni Pkwy Signal 93.5 F 122.2 F
4. Warren Rd/Simpson Rd AWSC 20.5 C 21.4 C
5. Warren Rd/Domenigoni Pkwy Signal 67.2 E 44.8 D
6. Warren Rd/SR 74 Signal 37.7 D 39.0
38.9 D
7. Warren Rd/Stetson Ave AWSC 105.1 F 121.5
121.2
F
8. Warren Rd/Mustang Way Signal 11.6 B 12.9
9.6 A
9. Project Dwy-1/Simpson Rd TWSC 12.3 B 9.0
12.9 A
B
10. Project Dwy-2/Simpson Rd TWSC 9.1 A 9.3 A
11. Project Dwy-3/Simpson Rd TWSC 9.2 A 9.7 A
12. Project Dwy-4/Simpson Rd TWSC 12.7 B 13.6 B
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-5
Final EIR
April 2025
AM Peak PM Peak
Intersection Control Type Delay LOS Delay LOS
13. Project Dwy-5/Simpson Rd TWSC 9.1 A 9.7 A
14. Project Dwy-6/Simpson Rd TWSC 16.7 C 20.1 C
Source: EPD Solutions, 2024a (Appendix N)
AWSC = All Way Stop Control
TWSC = Two Way Stop Control
Delay Reported in Seconds per Vehicle
LOS = Level of Service
The third paragraph on page 5.15-15, in Section 5.15, Transportation, is revised as follows:
It should also be noted that intersection #1 (SR 79/SR 74) would operate at an unsatisfactory LOS F during the PM peak hour under cumulative conditions. As such, the Project would be required to pay fair share for the following improvements to achieve a satisfactory intersection LOS D:
• #1- SR 79/SR 74: Restripe the northbound-left to an exclusive left-turn lane, exclusive thru lane, and exclusive right-turn lane northbound left-thru lane, restripe northbound thru-right lane to exclusive rightturn lane, add right-turn overlap phasing. • #3- SR 79/Domenigoni Parkway: Add right-turn overlap to northbound right, add eastbound thru-lane.
Restrict U-turn on all approaches. Accommodate an additional westbound turn receiving lane by expanding the width of westbound intersection departure section by four feet. • #5- Warren Road/Domenigoni Parkway: Restripe the westbound right-turn lane to a shared thru-right lane.
• #7- Warren Road/Stetson Avenue: Install traffic signal, add northbound, southbound, and eastbound left-turn lane.
o Left-turn lanes are required for safety reasons on the southbound approach, due to the high southbound left-turn volume.
Left-turn lanes are recommended for better intersection operations on the northbound and eastbound approaches.
Chapter 8.0, Alternatives
The third paragraph on page 8-9, in Section 8.0, Alternatives, is revised as follows:
This alternative would also avoid the significant and unavoidable impacts to air quality, agriculture, greenhouse gas emissions, noise, and vehicle miles traveled. This alternative would result in lessened impacts to all 16 18 of the 16 18 environmental topics analyzed in this Draft EIR (see Table 8-3).
The third paragraph on page 8-15, in Section 8.0, Alternatives, is revised as follows:
Many of the mitigation measures would still be applicable to this alternative; however, this alternative would result in lessened impacts to 14 16 of the 16 18 environmental topics analyzed in this Draft EIR (see Table 8-3).
The fourth paragraph on page 8-21, in Section 8.0, Alternatives, is revised as follows:
While some impacts would be reduced, many of the impacts under this alternative would increase. All mitigation measures would still be applicable to this alternative; however, this alternative would result in lessened impacts to 4 of the 16 18 environmental topics analyzed in this Draft EIR (see Table 8-3).
The fifth paragraph on page 8-22, in Section 8.0, Alternatives, is revised as follows:
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-6
Final EIR
April 2025
This alternative would result in lessened impacts to 14 16 of the 16 18 environmental topics analyzed in this EIR.
7.A.
Newland Simpson Road Project 3. Revisions to the Draft EIR City of Hemet 3-7
Final EIR
April 2025
This page intentionally left blank.
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-1
Final EIR
April 2025
4. Mitigation Monitoring and Reporting Program
4.1 INTRODUCTION
The California Environmental Quality Act (CEQA) requires a lead or public agency that approves or carries out a project for which an Environmental Impact Report has been certified which identifies one or more significant adverse environmental effects and where findings with respect to changes or alterations in the project have been made, to adopt a “…reporting or monitoring program for the changes to the project which it has adopted or made a condition of project approval in order to mitigate or avoid significant effects on the environment” (Public Resources Code Sections 21081, 21081.6).
A Mitigation Monitoring and Reporting Program (MMRP) was prepared to ensure that adopted mitigation measures are successfully implemented for the Newland Simpson Road Project (Project). The City of Hemet (City) is the Lead Agency for the Project and is responsible for implementation of the MMRP. This report describes the MMRP for the Project and identifies the parties that will be responsible for monitoring implementation of the individual mitigation measures in the MMRP.
4.2 MITIGATION MONITORING AND REPORTING PROGRAM
The MMRP for the Project will be active through all phases of the Project, including design, construction, and operation. The attached table identifies the mitigation program that would be required to be implemented by the City for the Newland Simpson Road Project. The table identifies the Project Design Features (PDFs), Plans, Programs, or Policies (PPPs), and Mitigation Measures (MMs) required by the City to mitigate or avoid significant adverse impacts associated with the implementation of the Project; the timing of implementation; and the responsible party or parties for monitoring compliance.
The MMRP also includes a column that will be used by the compliance monitor (individual responsible for monitoring compliance) to document when implementation of the measure is completed. As the PDFs, PPPs, and Mitigation Measures are completed, the compliance monitor will sign and date the MMRP, indicating that the required actions have been completed.
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-2
Final EIR
April 2025
This page intentionally left blank.
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-3
Final EIR
April 2025
Table 4-1: Mitigation Monitoring and Reporting Program
Newland Simpson Road Project Final EIR
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
AESTHETICS
Plan, Program, or Policy PPP AE-1: Exterior Lighting. All lighting shall be directed or shielded away from nearby residential zones and contained within the boundaries of the site. Adequate lighting shall be provided to maintain a safe, on-site environment consistent with California Building Code (CBC) standards.
Prior to building permits City of Hemet Building &
Safety Division, &
Community Development,
Planning Division
AIR QUALITY
Plan, Program, or Policy PPP AQ-1: SCAQMD Rule 403. The following measures shall be incorporated into construction plans and specifications as implementation of SCAQMD Rule 403:
• All clearing, grading, earth-moving, or excavation activities shall cease when winds exceed 25 mph per SCAQMD guidelines in order to limit fugitive dust emissions.
• The contractor shall ensure that all disturbed unpaved roads and disturbed areas within the Project are watered at least three (3) times daily during dry weather. Watering, with complete coverage of disturbed areas, shall occur at least three times a day, preferably in the mid-morning, afternoon, and after work is done for the day. • The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are reduced to 15 miles per hour or less.
Prior to demolition,
grading, and construction
permits
City of Hemet Engineering
Department & Building &
Safety Division
Plan, Program, or Policy PPP AQ-2: SCAQMD Rule 1113. The Project is required to comply with the provisions of South Coast Air Quality Management District Rule (SCAQMD) Rule 1113. Only “Low-Volatile Organic Compounds” paints (no more than 50 gram/liter of Volatile Organic Compound (VOC) and/or High Pressure Low Volume (HPLV) applications shall be used.
Prior to demolition and
construction permits
City of Hemet Building &
Safety Division
Plan, Program, or Policy PPP AQ-3: Rule 402. The Project is required to comply with the provisions of South Coast Air Quality Management District (SCAQMD) Rule 402. The Project shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or Prior to demolition and
construction permits
City of Hemet Building &
Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-4
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
safety of any such persons or the public, or which cause, or have a natural tendency to cause, injury or damage to business or property.
Plan, Program, or Policy PPP AQ-4: Rule 1470. The Project is required to obtain a permit from SCAQMD for the proposed diesel fire pump and would be required to comply with Rule 1470, regulating the use of diesel-fueled internal combustion engines.
Prior to issuance of
certificates of occupancy
City of Hemet Building &
Safety Division
Mitigation Measure AQ-1: The Project shall utilize “Super-Compliant” low VOC paints for nonresidential interior and exterior surfaces and low VOC paint for parking lot surfaces. Super-Compliant low VOC paints have been reformulated to be more stringent than the regulatory VOC limits put forth by South Coast Air Quality Management District (SCAQMD)’s Rule 1113.
Super-Compliant low VOC paints shall be no more than 10g/L of VOC.
Alternatively, the applicant may utilize tilt-up concrete buildings that do not require the use of architectural coatings.
Prior to building permit City of Hemet Building &
Safety Division
Mitigation Measure AQ-2: Prior to the start of construction activities, the Project Applicant, or the Applicant designee, shall ensure that all dieselpowered equipment is powered with California Air Resources Board (CARB)- certified Tier 4 Final engines, except where the Project Applicant establishes to the satisfaction of the City of Hemet that Tier 4 Final equipment is not available. An exemption from these requirements may be granted by the City if the City documents that equipment with the required tier is not reasonably available and corresponding reductions in criteria air pollutant emissions are achieved from other construction equipment to the maximum extent feasible. Before an exemption may be considered by the City, the Project Applicant shall be required to demonstrate that at least two construction fleet owners/operators were contacted and that those owners/operators confirmed Tier 4 Final equipment is not/would not be available. In order to meet this requirement to demonstrate that such equipment is not available, the Applicant must seek bids/proposals from contractors of large fleets, defined by the CARB as, “A fleet with a total max hp (as defined below) greater than 5,000 hp.” In the event that Tier 4 Final equipment is not available, Tier 4 interim equipment shall be required. In the event that Tier 4 Interim equipment is not available, Tier 3 equipment shall be used. All construction equipment shall be tuned and maintained in accordance with the manufacturer’s specifications.
Prior to grading permit
and building permit
City of Hemet Engineering
Department, Building &
Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-5
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
BIOLOGICAL RESOURCES
Plan, Program, or Policy PPP BIO-1: MSHCP Fees. Prior to the issuance of any grading permits, fees required pursuant to the Western Riverside MSHCP implemented under Hemet Municipal Code (HMC) Section 58-98 shall be submitted to the Western Riverside County MSHCP. The Western Riverside MSHCP requires a per-acre local development impact and mitigation fee payment prior to the issuance of a grading permit.
Prior to the issuance of
grading permits
City of Hemet Engineering
Department & Building &
Safety Division
Mitigation Measure BIO-1: A pre-construction/ clearance burrowing owl survey shall be performed not more than 30 days prior to initial ground disturbance activity to determine presence/absence of the species. A qualified biologist shall survey the Project site and a buffer zone, 500-feet outside the Project limits for burrows that could be used by burrowing owls.
If the burrow is determined to be occupied, the burrow shall be flagged, and a 160-foot diameter buffer shall be established during nonbreeding season or a 250-foot diameter buffer during the breeding season. If burrows onsite are unoccupied, construction may proceed.
If the site survey determines the presence of burrowing owl, mitigation in accordance with the California Department of Fish and Wildlife (CDFW) shall be implemented as follows:
• If burrowing owls are identified as being resident on-site outside the breeding season (September 1 to February 14) they may be relocated to other sites by a permitted biologist (permitted by CDFW), as allowed in the CDFW Staff Report on Burrowing Owl Mitigation (March 2012). • If an active burrow is found during the breeding season, the burrow shall be treated as a nest site and temporary fencing shall be installed at a distance from the active burrow, to be determined by the biologist, to prevent disturbance during grading or construction. Installation and removal of the fencing shall be done with a biological monitor present. • Active relocation and eviction/passive relocation shall require the preservation and maintenance of suitable burrowing owl habitat determined through coordination with the Wildlife Agencies.
Prior to the issuance of
grading permits
City of Hemet Community
Development, Division and
Engineering Department
Mitigation Measure BIO-2: Nesting Bird Survey. Vegetation removal should occur outside of the nesting bird season (generally between February 1 and August 31). If vegetation removal is required during the nesting bird season, the applicant shall conduct take avoidance surveys for nesting birds prior to initiating vegetation removal/clearing. Surveys shall be conducted by a Prior to the issuance of
grading permits
City of Hemet Community
Development Department,
Planning Division and
Engineering Department
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-6
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
qualified biologist(s) within three days of vegetation removal. If active nests are observed, a qualified biologist shall determine appropriate minimum disturbance buffers and other adaptive mitigation techniques (e.g., biological monitoring of active nests during construction-related activities, staggered schedules, etc.) to ensure that impacts to nesting birds are avoided until the nest is no longer active. At a minimum, construction activities shall stay outside of a 200-foot buffer around the active nests. The approved buffer zone shall be marked in the field with construction fencing, within which no vegetation clearing or ground disturbance shall commence until the qualified biologist and Riverside County Environmental Programs Department verify that the nests are no longer occupied, and the juvenile birds can survive independently from the nests. Once the young have fledged and left the nest, or the nest otherwise becomes inactive under natural conditions, normal construction activities may occur.
CULTURAL RESOURCES
Mitigation Measure CUL-1: Cultural Resources Monitoring Program. Prior to issuance of grading permits the applicant/developer shall provide evidence to the City of Hemet Planning Division that a qualified professional archeologist meeting the Secretary of Interior’s PQS for Archaeology (as defined in the Code of Federal Regulations, 36 CFR Part 61) has been retained to prepare a Cultural Resource Monitoring Program (CRMP) and to conduct monitoring of rough grading activities. The CRMP shall be developed in coordination with the consulting tribe(s) and address the details of all activities and provides procedures that must be followed in order to reduce the impacts to cultural, tribal cultural and historic resources to a level that is less than significant as well as address potential impacts to undiscovered buried archaeological resources associated with this Project. The Archaeologist shall conduct a Cultural Resource Sensitivity Training, in conjunction with the Tribe(s) Tribal Historic Preservation Officer (THPO), and/or designated Tribal Representative. The training session shall focus on the archaeological and tribal cultural resources that may be encountered during ground-disturbing activities as well as the procedures to be followed in such an event.
The retained Qualified archeologist and Consulting Trib(s) representative shall attend the pre-grade meeting with the grading contractors to explain and coordinate the requirements of the monitoring plan.
Prior to issuance of
grading permits
City of Hemet Community
Development Department,
Planning Division;
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-7
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
In the event that a resource is inadvertently discovered during grounddisturbing activities, work shall be halted within 60 feet of the find until it can be evaluated by the qualified archaeologist. Construction activities can continue in other areas. If the find is considered a “resource” the archaeologist shall pursue either protection in place or recovery, salvage and treatment of the deposits. Recovery, salvage and treatment protocols shall be developed in accordance with applicable provisions of Public Resource Code Section 21083.2 and State CEQA Guidelines 15064.5 and 15126.4 in consultation with the City. Per CEQA Guidelines Section 15126.4(b)(3), preservation in place shall be the preferred means to avoid impacts to archaeological resources qualifying as historical resources. Consistent with CEQA Guidelines Section 15126.4(b)(3)(C), if unique archaeological resources cannot be preserved in place or left in an undisturbed state, recovery, salvage, and treatment shall be required at the developer/applicant’s expense. If significant pre-contact and/or historic-era cultural resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the drafts of which shall be provided to consulting tribe(s) for review and comment, as detailed within TCR-1. The archaeologist shall monitor the remainder of the Project and implement the Plan accordingly.
Mitigation Measure CUL-2: Final Monitoring Report. A final monitoring report shall be prepared by the qualified archaeologist prior to issuance of any certificate of occupancy. The final monitoring report(s) created as a part of the Project (AMTP), isolate records, site records, survey reports, testing reports, etc.) shall be submitted to the Lead Agency and Consulting Tribe(s) for review and comment. After approval of all parties, the final reports are to be submitted to the Eastern Information Center, and the Consulting Tribe(s).
Prior to issuance of
certificate of occupancy
City of Hemet Community
Development Department,
Planning Division & Building
& Safety Division
Mitigation Measure CUL-3: Inadvertent Discovery of Human Remains.
A. Should human remains and/or cremations be encountered on the surface or during any and all ground-disturbing activities (i.e., clearing, grubbing, tree and bush removal, grading, trenching, fence post placement and removal, construction excavation, excavation for all water supply, electrical, and irrigation lines, and landscaping phases of any kind), and work in the immediate vicinity of the discovery shall immediately stop within a 100-foot perimeter of the discovery. The area shall be protected; Project personnel/observers will be restricted. The County Coroner shall be contacted within 24 hours of discovery. The County Coroner has 48 hours to make During ground-disturbing
activities
City of Hemet Community
Development Department,
Planning Division & Building
& Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-8
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
his/her determination pursuant to State and Safety Code §7050.5. and Public Resources Code (PRC) § 5097.98. No photographs shall be taken except by the coroner, with written approval by the consulting Tribe(s).
B. In the event that the human remains and/or cremations are identified as Native American, the Coroner shall notify the Native American Heritage Commission within 24 hours of determination pursuant to subdivision (c) of HSC §7050.5.
C. The Native American Heritage Commission shall immediately notify the person or persons it believes to be the Most Likely Descendant (MLD). The MLD has 48 hours, upon being granted access to the Project site, to inspect the site of discovery and make his/her recommendation for final treatment and disposition, with appropriate dignity, of the remains and all associated grave goods pursuant to PRC §5097.98
D. If the Morongo Band of Mission Indians has been named the Most Likely Descendant (MLD), the Tribe may wish to rebury the human remains and/or cremation and sacred items in their place of discovery with no further disturbance where they will reside in perpetuity. The place(s) of reburial shall not be disclosed by any party and is exempt from the California Public Records Act (California Government Code § 6254[r]). Reburial location of human remains and/or cremations shall be determined by the Tribe’s Most Likely Descendant (MLD), the landowner, and the City Planning Division.
ENERGY
Plan, Program, or Policy PPP E-1: CalGreen Compliance: The Project is required to comply with the CalGreen Building Code (CBC) to ensure efficient use of energy. CalGreen specifications are required to be incorporated into building plans as a condition of building permit approval.
Prior to issuance of
building permits
City of Hemet Building &
Safety Division
GEOLOGY AND SOILS
PPP GEO-1: CBC Compliance. The Project is required to comply with the California Building Standards Code (CBC) as included in Chapter 14, Article II, Division 3, Section 14-40 of the HMC to preclude significant adverse effects associated with seismic and soils hazards. CBC related and geologist and/or civil engineer specifications for the proposed Project are required to be incorporated into grading plans and building specifications as a condition of construction permit approval.
Prior to issuance of
grading and building
permits
City of Hemet Building &
Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-9
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
Mitigation Measure PAL-1: Paleontological Monitoring. Prior to the issuance of grading permits, the Applicant shall provide a letter to the City, or City designee, from a professional paleontologist, stating that a qualified paleontologist (who meets the Society of Vertebrate Paleontology’s (SVP, 2020) definition for qualified profession paleontologist) has been retained to provide services for the proposed Project. The paleontologist shall develop a Paleontological Resources Impact Mitigation Plan (PRIMP) to mitigate the potential impacts to unknown buried paleontological resources that may exist onsite. The PRIMP shall be provided to the City for review and approval. The PRIMP shall require that the paleontologist be present at the pre-grading conference to establish procedures for paleontological resource surveillance.
Prior to commencement of grading activities, the City of Hemet Planning Division, or designee, shall verify that all Project grading and construction plans specify the requirements herein related to the PRIMP and the unanticipated discovery of paleontological resources.
The PRIMP shall also require that in areas mapped as late to middle Pleistocene old alluvial fan deposits, monitoringshall be conducted full-time in undisturbed alluvium starting at the surface. In areas mapped as Holocene to late Pleistocene young alluvial valley deposits, monitoring shall be conducted full-time in undisturbed alluvium starting at a depth of five feet below the surface during grading or excavation activities. In the event paleontological resources are encountered, ground disturbing activity within 50 feet of the area shall cease. The paleontologist shall examine the materials encountered, assess the nature and extent of the find, and recommend a course of action to further investigate and protect or recover and salvage those resources that have been encountered pursuant to the guidelines of the Society of Vertebrate Paleontology (SVP, 2010).
Criteria for discarding specific fossil specimens shall be made explicit in the PRIMP. If the qualified paleontologist determines that impacts to a sample containing significant paleontological resources cannot be avoided by Project construction, then recovery techniques shall be applied. Actions include recovering a sample of the fossiliferous material prior to construction, monitoring construction activities and halting construction if an important fossil needs to be recovered, and/or cleaning, identifying, and cataloging specimens for curation and research purposes. Recovery, salvage, and treatment shall be done at the Applicant’s expense. All recovered and salvaged resources shall be prepared to the point of identification and permanent preservation by the paleontologist. Resources shall be identified Prior to issuance of
grading permits
City of Hemet Community
Development Department,
Planning & Engineering
Department y Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-10
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
and curated into an established accredited professional repository. The paleontologist shall have a repository agreement in hand prior to initiating recovery of the resource. If no institution accepts the fossil(s), they shall be donated to a local school in the area for educational purposes.
Accompanying notes, maps, and photographs shall also be filed at the repository and/or school. A report documenting the results of the monitoring, including any salvage activities and the significance of any fossils, shall be prepared and submitted to the City, or City designee. The report and inventory, when submitted to the City of Hemet Planning Division, shall signify completion of the program to mitigate impacts to paleontological resources.
GREENHOUSE GAS EMISSIONS
Mitigation Measure GHG-1: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating all light bulbs and light features within the Project are Energy Star certified.
Prior to issuance of
building permit
City of Hemet Building &
Safety Division
Mitigation Measure GHG-2: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating the building will provide water efficient toilets (1.5 gallons per minute [gpm]).
Prior to issuance of
building permits
City of Hemet Building &
Safety Division
Mitigation Measure GHG-3: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating the building will provide waterless urinals.
Prior to issuance of
building permits
City of Hemet Building &
Safety Division
Mitigation Measure GHG-4: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating the building will provide water efficient faucets (1.28 gpm).
Prior to issuance of
building permits
City of Hemet Building &
Safety Division
Mitigation Measure GHG-5: Legible, durable, weather-proof signs shall be placed at truck access gates, loading docks, and truck parking areas of the warehouse portion of the Project that identify applicable California Air Resources Board (CARB) anti-idling regulations. At a minimum, each sign shall include: 1) instructions for truck drivers to shut off engines when not in use; 2) instructions for drivers of diesel trucks to restrict idling to no more than five (5) minutes once the vehicle is stopped, the transmission is set to "neutral" or "park," and the parking brake is engaged; and 3) telephone numbers of the building facilities manager and the CARB to report violations. Prior to the Prior to issuance of
certificates of occupancy
City of Hemet Community
Development Department,
Planning Division &
Building & Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-11
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
issuance of an occupancy permit, the City shall conduct a site inspection to ensure that the signs are in place.
Mitigation Measure GHG-6: Prior to issuance of a building permit, the Project Applicant shall provide the City with an onsite signage program that clearly identifies the required onsite circulation system. This shall be accomplished through posted signs and painting on driveways and internal roadways.
Prior to issuance of
building permits
City of Hemet Community
Development Department,
Planning Division & Building
& Safety Division
Mitigation Measure GHG-7: Prior to issuance of an occupancy permit, the City shall confirm that signs clearly identifying approved truck routes have been installed on Simpson Road and Warren Road.
Prior to issuance of
certificates of occupancy
City of Hemet Community
Development Department,
Planning Division & Building
& Safety Division
Mitigation Measure GHG-8: Prior to issuance of an occupancy permit, the Project Applicant shall install a sign on the property with telephone, email, and regular mail contact information for a designated representative of the tenant who would receive complaints about excessive noise, dust, fumes, or odors. The sign shall also identify contact data for the City for perceived Code violations. The tenant’s representative shall keep records of any complaints received and actions taken to communicate with the complainant and resolve the complaint. The tenant’s representative shall endeavor to resolve complaints within 72 hours.
Prior to issuance of
certificates of occupancy
City of Hemet Community
Development Department,
Planning Division & Building
& Safety Division
Mitigation Measure GHG-9: All on-site outdoor cargo-handling equipment (including yard trucks, hostlers, yard goats, pallet jacks, forklifts, and other on-site equipment) shall be electric or non-diesel fueled. All on-site indoor forklifts shall be powered by electricity.
Prior to issuance of
certificates of occupancy
City of Hemet Community
Development Department,
Planning Division & Building
& Safety Division
Mitigation Measure GHG-10: Prior to issuance of an occupancy permit for each building/occupancy each owner/tenant shall develop a use/occupantspecific transportation demand management (TDM) program. The TDM program shall be submitted to the City Planning Division and City Building & Safety Division for review and approval as part of the certificate of occupancy. Recommended California Air Pollution Control Officers Association (CAPCOA) TDM program elements are listed below:
• Provide pedestrian and bicycle network improvements within the development connecting to existing off-site facilities. • Where applicable ensure design of key intersections and roadways encourage the use of walking, biking and where applicable transit.
Prior to issuance of
certificates of occupancy
City of Hemet Community
Development Department,
Planning Division, and
Building & Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-12
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
• Commute trip reduction (CTR) programs offered to encourage the use of vanpools, carpooling, public transit, and biking.
HYDROLOGY AND WATER QUALITY
Plan, Program, or Policy PPP HYD-1: NPDES/SWPPP. Since this Project is one acre or more, the permit holder shall comply with all of the applicable requirements of the National Pollutant Discharge Elimination System (NPDES) and shall conform to NPDES Best Management Practices for Stormwater Pollution Prevention Plans (SWPPP) during the life of this permit. Prior to issuance of any grading or construction permits - whichever comes first - the Applicant shall provide the Building and Safety Department evidence of submitting a Notice of Intent (NOI), develop and implement a SWPPP and a monitoring program and reporting plan for the construction site.
Prior to issuance of a
grading permit
City of Hemet Engineering
Department
Plan, Program, or Policy PPP HYD-2: WQMP. Prior to the approval of the Grading Plan and issuance of Grading Permits a completed Water Quality Management Plan (WQMP) shall be submitted to and approved by the City Building and Safety Department. The WQMP shall identify all PostConstruction, Site Design, Source Control, and Treatment Control Best Management Practices (BMPs) that will be incorporated into the development Project in order to minimize the adverse effects on receiving waters.
Prior to issuance of a
grading permit
City of Hemet Engineering
Department
NOISE
Plan, Program, or Policy PPP NOI-1: Construction Noise. Chapter 30, Article II, Section 30-32(33) of the HMC permits construction activities between the hours of 6:00 a.m. and 6:00 p.m. during the months of June through September and between the hours of 7:00 a.m. and 6:00 p.m. during the months of October through May. Exceptions to these standards may be granted only by the City’s building official and/or the City Council.
Construction occurring consistent with these provisions is exempt from regulation.
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division
PDF NOI-1: All construction activities shall comply with HMC Section 30- 32[a][43], restricting construction activities to the approved hours of construction as set forth on a permit or other city entitlement as issued by the City’s building official, Planning Commission, or City Council, or as otherwise prohibited by the Hemet Building Code.
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-13
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
PDF NOI-2: Construction contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers, consistent with manufacturers’ standards).
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division, &
Engineering Department
PDF NOI-3: All stationary construction equipment shall be placed in such a manner so that the emitted noise is directed away from any sensitive receivers.
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division, &
Engineering Department
PDF NOI-4: Construction equipment staging areas shall be located at the greatest feasible distance between the staging area and the nearest sensitive receivers.
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division, &
Engineering Department
PDF NOI-5: The construction contractor shall limit equipment and material deliveries to the same hours specified for construction equipment.
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division, &
Engineering Department
PDF NOI-6: Electrically powered air compressors and similar power tools shall be used, when feasible, in place of diesel equipment.
Prior to issuance of
grading and/or building
permits
During
grading/excavation and
construction activities
City of Hemet Building &
Safety Division, &
Engineering Department
PDF NOI-7: No music or electronically reinforced speech from construction workers shall be allowed.
Prior to issuance of
grading and/or building
permits
City of Hemet Building &
Safety Division.
Engineering Department
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-14
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
During
grading/excavation and
construction activities
PUBLIC SERVICES
Plans, Program, or Policy PPP PS-1: School Impact Fees. Prior to the issuance of either a certificate of occupancy or prior to building permit final inspection, the applicant shall provide payment of the appropriate fees set forth by the Hemet Unified School District related to the funding of school facilities pursuant to Government Code Section 65995 et seq.
Prior to issuance of
certificates of occupancy
or prior to building
permit final inspection
City of Hemet Building &
Safety Division
TRANSPORTATION
PDF TR-1: Sidewalks. The Project would construct sidewalks along the Project’s frontage on Simpson Road and Warren Road.
Prior to issuance of
certificates of occupancy
City of Hemet Building &
Safety Division
TRIBAL CULTURAL RESOURCES
Mitigation Measure TCR-1: Tribal Monitoring Services Agreement. Prior to the issuance of grading permits, the applicant shall enter into a Tribal Monitoring Services Agreement with the Morongo Band of Mission Indians (MBMI), Soboba Band of Luiseño Indians, or Agua Caliente Band of Cahuilla Indians (ACBCI) for the Project. The Tribal Monitor shall be on-site during all ground-disturbing activities (including, but not limited to, clearing, grubbing, tree and bush removal, grading, trenching, fence post placement and removal, construction excavation, excavation for all utility and irrigation lines, and landscaping phases of any kind). The Tribal Monitor shall have the authority to temporarily divert, redirect, or halt the ground-disturbing activities to allow identification, evaluation, and potential recovery of cultural resources.
Prior to issuance of
permits associated with
ground-disturbing
activities
Monitoring during
ground-disturbing
activities
City of Hemet Building &
Safety Division
Mitigation Measure TCR-2: Inadvertent Discovery of Cultural Resources. In the event that previously unidentified cultural resources are unearthed during construction, the Qualified Archaeologist and the Tribal Monitor shall have the authority to temporarily divert and/or temporarily halt grounddisturbance operations in the area of discovery to allow for the evaluation of potentially significant cultural resources. Isolates and clearly non-significant deposits shall be minimally documented in the field and collected so the monitored grading can proceed.
During ground disturbing
activities
City of Hemet Building &
Safety Division
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-15
Final EIR
April 2025
Project Design Feature / Plan, Program, Policy / Mitigation Measure Timing Responsible for Ensuring Compliance / Verification
Date Completed
and Initials
If a potentially significant cultural resource(s) is discovered, work shall stop within a 60-foot perimeter of the discovery and an Environmentally Sensitive Area (ESA) physical demarcation/barrier constructed. All work shall be diverted away from the vicinity of the find, so that the find can be evaluated by the Qualified Archaeologist and Tribal Monitor[s]. The Archaeologist shall notify the Lead Agency and consulting Tribe[s] of said discovery. The Qualified Archaeologist, in consultation with the Lead Agency, the consulting Tribe[s], and the Tribal Monitor, shall determine the significance of the discovered resource. A recommendation for the treatment and disposition of the Tribal Cultural Resource shall be made by the Qualified Archaeologist in consultation with the Tribe[s] and the Tribal Monitor[s] and shall be submitted to the Lead Agency for review and approval. Below are the possible treatments and dispositions of significant cultural resources in order of CEQA preference:
A. Full avoidance.
B. If avoidance is not feasible, Preservation in place.
C. If Preservation in place is not feasible, all items shall be reburied in an area away from any future impacts and reside in a permanent conservation easement or Deed Restriction.
D. If all other options are proven to be infeasible, data recovery through excavation and then curation in a Curation Facility that meets the Federal Curation Standards (Code of Federal Regulations (CFR) 79.1)
7.A.
Newland Simpson Road Project 4. Mitigation Monitoring and Reporting Program City of Hemet 4-16
Final EIR
April 2025
This page intentionally left blank.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
CITY OF HEMET
DRAFT
CONDITIONS OF APPROVAL
PLANNING COMMISSION HEARING DATE: December 3, 2024
CITY COUNCIL HEARING DATE: March 10, 2026
PROJECT NO: GENERAL PLAN AMENDMENT (GPA 22-003), CONDITIONAL USE PERMIT (CUP 22-006), and TENTATIVE PARCEL MAP (MAP 23-008) APPLICANT: Newland Capital Group
OWNER: HSL Hemet Land
LOCATION: The intersection of Warren Road and Simpson Road.
Note: Any conditions revised at a hearing will be noted by strikeout (for deletions) and/or underline (for additions), and any newly added conditions will be added at the end of all conditions regardless of the Department originating the condition.
STANDARD CONDITIONS
The following conditions of approval were approved by the City Council as standard conditions of approval for all projects. Questions regarding compliance with these conditions should be directed to the Community Development Department (Planning Division) at (951) 765-2375.
General Requirements:
1. GENERAL PLAN AMENDMENT (GPA 22-003), CONDITIONAL USE PERMIT (CUP 22-006), AND TENTATIVE PARCEL MAP NO. 38800 shall become null and void on March 10, 2027 (two calendar years from the date of approval), unless use in reliance on the approved Conditional Use Permit is established prior to the expiration date. A time extension may be granted by the Planning Commission in accordance with the Hemet Municipal Code, provided a written request for a time extension is submitted the Planning Division prior to the expiration date. No formal notice of expiration will be given by the City.
2. Approval of GENERAL PLAN AMENDMENT (GPA 22-003), CONDITIONAL USE PERMIT (CUP 22-006), TENTATIVE PARCEL MAP NO. 38800 & shall become effective on March 10, 2027.
3. The conditions of approval of this project shall supersede all conflicting notations, specifications, dimensions, typical sections, and the like, which may be shown on the project development plans.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
4. This project site shall be developed in accordance with the approved plan(s) and the conditions contained herein.
5. This project shall comply with all sections of the Zoning Ordinance, Subdivision Ordinance and all other applicable Local, State and Federal laws and regulations in effect at the time of the building permit application and/or time of recordation, including the California Building Code, California Fire Code, and City and State Accessibility Requirements (California Code of Regulations, Title 24).
6. Prior to the issuance of building permits, the applicant shall be subject to all applicable development fees at the rate in effect at the time of building permit application for the tenant improvement.
7. The applicant shall indemnify, protect, defend, and hold harmless, the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, from any and all claims, demands, law suits, writs of mandamus, and other actions and proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature), and alternative dispute resolutions procedures (including, but not limited to arbitrations, mediations, and other such procedures), (collectively “Actions”), brought against the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, the any action of, or any permit or approval issued by, the City and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by voters of the City), for or concerning the project, whether such Actions are brought under the California Environmental Quality Act, the Planning and Zoning Law, the Subdivisions Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local statute, law, ordinance, rule, regulation, or any decision of a court of competent jurisdiction. It is expressly agreed that the City shall have the right to approve, which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that applicant shall reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the applicant of any Action brought and City shall cooperate with applicant in defense of the Action. (City Council Resolution No. 3693)
8. Construction activity shall meet the requirements of the Hemet Municipal Code Chapter 30, Article II.
PLANNING DIVISION CONDITIONS
The following conditions of approval are project specific and were recommended by the Planning Division. Questions regarding compliance with these conditions should be directed to the City of Hemet Planning Division at (951) 765-2375.
9. Prior to the issuance of a Certificate of Occupancy for the project site or business activity being commenced thereon, pursuant to GENERAL PLAN AMENDMENT (GPA 22-003), CONDITIONAL USE PERMIT (CUP 22-006), and TENTATIVE PARCEL MAP NO. 38800
all conditions of approval contained herein shall be completed to the satisfaction of the Planning
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
Division.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
10. Any uses not specifically permitted as part of, or not determined to be in substantial conformance by the Community Development Director shall require submittal and approval of an application for the modification of the Conditional Use Permit.
11. Construction activity shall only occur between the hours of 6:00 a.m. and 6:00 p.m. during the months of June through September and between the hours of 7:00 a.m. and 6:00 p.m. during the months of October through May. Saturday construction shall be permitted between the hours of 7:00 a.m. and 6:00 p.m. Sunday construction shall be prohibited. Exceptions to these standards may be granted only by the Hemet Building Official and/or the Hemet City Council. The applicant shall post a publicly visible sign on the project site with the telephone number and 24-hour point of contact for dust, noise and construction complaints.
12. All lighting provided in connection with such facilities shall be LED lights or equivalent, installed and shielded to confine direct rays of artificial light within the boundaries of the parking lot. Light standards shall not exceed 25 feet in height and shall be located so as not to interfere with parking lot landscaping. Prior to Building Permit Issuance, a photometric plan shall be submitted to the Planning Division demonstrating compliance with condition.
13. An anti-graffiti coating and/or shall be provided up to 10 feet on all block walls and stucco covered walls and written verification of its application from the developer shall be provided to the Planning Division. The type and specification shall be listed with the wall plan details submitted to the Building and Safety Division during building plan check.
14. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Plan planting beds and design around utilities. Locate all light poles on plans and ensure that there are no conflicts with trees.
15. Signage is not approved as part of this Project. A master signage program shall be submitted to the Community Development Department (Planning Division) for review and approval consistent with the Hemet Municipal Code. The applicant shall submit plans for a Permanent Sign Permit to the Building and Safety Division as approved by the Planning Division.
16. A perimeter fencing and wall plan shall be submitted to the Building Department for building permit issuance, subject to review by the Community Development Department (Planning Division). Proposed wrought iron fencing located along the frontage of Simpson Road and Warren Road, shall be setback behind the required landscape buffer and parkway. The perimeter wall located on the west property line adjacent to residential zone shall include integral colored block pattern, anti-graffiti coating, natural earth tone colors selected from the approved architectural colors and materials palette for the development with architectural relief every 100 feet.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
Operational Conditions
17. During business operations, trucks shall be turned off when not in use. Prior to the issuance of Certificate of Occupancy, the applicant shall submit an Employee Truck Driver Management Plan to the Planning Division identifying restriction of idling trucks within the facility. Strategies shall be incorporated to reduce the idling time of diesel engines through alternative technologies such as IdleAire, electrification of truck parking, and alternative energy sources to allow diesel engines to be completely turned off.
18. No loading or unloading is allowed within drive aisles, parking areas, or on adjacent public streets. Loading areas shall be kept free of debris and clean throughout the life of the project.
19. Security surveillance cameras and equipment shall be installed to be reviewed and approved by the police department prior to permitting and installation. The equipment shall be able to record a minimum of 24 hours of operation. The facility operator shall maintain the recordings for the prior 60 days.
20. Prior to the issuance of tenant improvement building permits, the applicant shall prepare a security plan for the site. The security plan for this project shall include a comprehensive security camera system that clearly depicts the entire parking field. This security camera system shall be based in the building containing the management office for this development, or inside a security office or other place acceptable to the City of Hemet Police Department, that is accessible to law enforcement at all times of the day and night. This security camera system shall have a recording capacity to minimally save footage for the period of one month or as approved by the Police Department. The above camera surveillance system shall include LPR (License Plate Recognition) cameras installed at the entrances/exits to this project or as approved by the Police Department. LPR cameras are cameras specifically designed to read and record vehicle license plates as they enter and exit this complex. It should be noted that high quality day/night vision LPR cameras are relatively inexpensive. The plan shall be approved prior to issuance of tenant improvement Building Permits. The Police Department and/or Community Development Department shall verify that the security system has been installed prior to final tenant occupancy. In addition, the trash enclosure shall be properly secured and have a lock as well as a covering to keep unauthorized persons from entering the dumpster area.
21. The owner or operator of the use shall remove or paint over any graffiti within 48 hours of the graffiti being painted or marked upon the premises. Prior to issuance of a building permit, the applicant shall sign a graffiti removal property access waiver. The City shall have access to the property for the removal of the graffiti on any portion of the building or site if graffiti is not removed within 48 hours of the graffiti being painted or marked upon the premises. The property owner or business owner and or tenant shall incur any associated costs for said graffiti removal.
22. All storage of equipment and materials shall be fully contained inside the building.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
23. Storage yard for contractor equipment and materials is prohibited. Additionally, the outdoor storage of temporary accessory structures, including metal or other storage containers is prohibited.
24. Ground mounted solar energy systems is prohibited.
25. Per the Environmental Impact Report Mitigation, Monitoring and Report Program of tenant occupancy permits, the City of Hemet shall permit for warehousing and distribution purposes. Cold storage was not included in the Environmental Impact Report and is prohibited.
26. The design of dock loading doors shall minimize noise through installation of devices such as rubber seals and/or other sound reduction features, to be included with tenant improvement building plans.
27. All electrical and mechanical equipment, including but not limited to, air-conditioning units, electrical boxes, backflow preventers, and roof-mounted equipment shall be visually screened from public view. All roof-mounted air conditioning units proposed for the shall provide screening from a public view via a screen enclosure that is architecturally compatible with the building. Screening material can include but is not limited to louvered roof equipment screens or panels. Screening shall be in accordance with city standards, to the satisfaction of the Planning Division and in compliance with the Building Code.
28. The applicant shall revise the north and south elevations to match facade enhancement upgrade as provided on July 14, 2025.
29. Landscape screening shall be provided along the west perimeter of Parcel 1 with a maximum tree height of 14 feet.
Onsite Landscaping
30. An onsite landscape and irrigation plan shall be submitted to the Building and Safety Division for permitting, subject to the conditions of approval provided by the Planning Division.
31. Prior to final inspection, the applicant's landscape architect or the party responsible for preparing the landscaping and irrigation plans shall provide a compliance letter to the Building and Safety Division verifying that the landscape and the irrigation system has been installed in compliance with the approved landscape documentation package.
32. Parking lot landscaping in the business park zone shall cover 10 percent of parking area.
The final master landscape and irrigation plan calculations shall be adjusted accordingly.
33. Trees shall be planted in the required parking area at a ratio of 1 tree per 5 parking spaces.
34. In addition to the required number of street trees and parking area trees, 1 tree shall be planted for every 500 square feet of landscaping in all other areas. The final master
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
landscape and irrigation plan calculations shall be adjusted accordingly.
35. All trees onsite shall be a minimum of 15-gallon size with 25 percent planted at 24-inch box size. The final landscape and irrigation plans shall be adjusted accordingly.
36. A minimum of 25 percent of all landscaping areas shall be planted in shrubs. The shrub areas shall be inter-planted with non-aggressive type ground cover. Triangular spacing shall be used in row plantings of all ground cover and shrubs. This includes all on-site retention areas. The final landscape and irrigation plans shall include percentage calculations and revised accordingly.
37. Where landscaping is required, it shall consist predominantly of plant materials, except for necessary walks and drives. Planted areas, where prescribed, shall be landscaped exclusively with live plant materials.
38. The final landscape and irrigation plan shall comply with the Model Water Efficient Landscaping Ordinance (CCR, Title 23, Division 2, Chapter 2.7.) and Hemet Municipal Code Article XLVIII Landscaping and Irrigation.
39. The final landscape and irrigation plan shall include water use calculations in accordance with Hemet Municipal Code Section 90-1706.
40. Prior to the issuance of a Certificate of Occupancy, all landscaping shall be installed and operational with an automatic irrigation system, including automatic timers.
Offsite Landscaping in the Right-Of-Way
41. An offsite (right-of-way) landscape and irrigation plan shall be submitted to the Public Works (Engineering Division) for review and approval, subject to conditions of approval provided by Public Works.
42. Prior to issuance of an off-site landscape permit, a one-year Faithful Performance bond, (equal in value to ten percent (10%) of the cost of the installed landscaping) shall be posted to guarantee installation, plant health, and established growth. The bond may be reduced by the City after installation has been approved.
Economic Development Division
43. Developer to fund or construct a new “Welcome to the City of Hemet” monument sign that is to be no smaller in size that 3’ tall x 5’ wide. Developer to abide by all city signage guidelines; and either payment or construction start of the signage shall be made prior to occupancy.
44. Developer to donate or construct $50,000 of artwork that celebrates the City of Hemet’s culture and history as outlined in section 10 of the General Plan. Developer to coordinate with the city planner to ensure that either payment or commissioning of the artwork shall be made prior to occupancy.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
45. Developer to schedule and host a job fair to be held within the city boundaries to support the hiring of Hemet residents. This job fair shall be coordinated with the city economic development manager and requires at least 4 weeks’ notice prior to the event.
46. Developer to enhance the building’s corner office characteristics in order to tie in architectural elements of the Western Science Center at project’s sole cost.
AIRPORT LAND USE COMMISSION CONDITIONS
47. Any outdoor lighting installed shall be hooded or shielded to prevent either the spillage of lumens or reflection into the sky. Outdoor lighting shall be downward facing.
48. The following uses shall be prohibited:
a) Any use which would direct a steady light or flashing light of red, white, green, or amber colors associated with airport operations toward an aircraft engaged in an initial straight climb following takeoff or toward an aircraft engaged in a straight final approach toward a landing at an airport, other than an FAA-approved navigational signal light or visual approach slope indicator.
b) Any use which would cause sunlight to be reflected towards an aircraft engaged in an initial straight climb following takeoff or towards an aircraft engaged in a straight final approach towards a landing at an airport.
c) Any use which would generate smoke or water vapor or which would attract large concentrations of birds, or which may otherwise affect safe air navigation within the area. (Such uses include landscaping utilizing water features, aquaculture, outdoor production of cereal grains, sunflower, and row crops, composting operations, wastewater management facilities, artificial marshes, trash transfer stations that are open on one or more sides, recycling centers containing putrescible wastes, construction and demolition debris facilities, fly ash disposal, and incinerators.) d) Any use which would generate electrical interference that may be detrimental to the operation of aircraft and/or aircraft instrumentation.
e) Highly noise-sensitive nonresidential uses.
f) Any use which results in a hazard to flight, including physical (e.g. tall objects), visual, and electronic forms of interference with the safety of aircraft operations.
49. The attached “Notice of Airport in Vicinity” shall be provided to all prospective purchasers and occupants of the property.
50. The project has been evaluated to construct two industrial buildings totaling 1,192,418 square feet. Any increase in building area, change in use to any higher intensity use, change in building location, or modification of the tentative parcel map lot lines and areas will require an amended review to evaluate consistency with the ALUCP
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
compatibility criteria, at the discretion of the ALUC Director.
51. Any proposed stormwater basins or facilities shall be designed and maintained to provide for a maximum 48-hour detention period following the design storm, and remain totally dry between rainfalls. Vegetation in and around the basins that would provide food or cover for birds would be incompatible with airport operations and shall not be utilized in project landscaping. Trees shall be spaced so as to prevent large expanses of contiguous canopy, when mature. Landscaping in and around the basin(s) shall not include trees or shrubs that produce seeds, fruits, or berries.
Landscaping in the stormwater basin, if not rip-rap, should be in accordance with the guidance provided in ALUC “LANDSCAPING NEAR AIRPORTS” brochure, and the “AIRPORTS, WILDLIFE AND STORMWATER MANAGEMENT” brochure available at RCALUC.ORG which list acceptable plants from Riverside County Landscaping Guide or other alternative landscaping as may be recommended by a qualified wildlife hazard biologist.
A notice sign, in a form similar to that attached hereto, shall be permanently affixed to the stormwater basin with the following language: “There is an airport nearby. This stormwater basin is designed to hold stormwater for only 48 hours and not attract birds.
Proper maintenance is necessary to avoid bird strikes”. The sign will also include the name, telephone number or other contact information of the person or entity responsible to monitor the stormwater basin.
52. The project has been evaluated to construct two industrial buildings totaling 1,192,418 square feet. Any increase in building area, change in use to any higher intensity use, change in building location, or modification of the tentative parcel map lot lines and areas will require an amended review to evaluate consistency with the ALUCP compatibility criteria, at the discretion of the ALUC Director.
ENGINEERING DEPARTMENT CONDITIONS
GENERAL
53. All conditions of approval shall be satisfied PRIOR to issuance of a grading permit UNLESS otherwise stated in the condition.
54. All required Civil Engineering plans and studies shall be prepared by a California licensed Professional Engineer or California Registered Professional Surveyor, as applicable, and be submitted to the City Engineer for review and approval. All work in the public right-of-way will require an Encroachment Permit issued from the Engineering department. Street lighting plans shall be prepared by a California licensed Electrical Engineer and landscape plans by a California licensed Landscape Architect.
55. Engineering plans/documents/reports shall be submitted in PDF format. Also City Engineer approved improvement plans showing City Engineer’s approval signature as well as Private Engineer’s approval signature shall be provided to Engineering Department.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
56. Developer shall annex to the Citywide Community Facilities District (CFD) for maintenance and operation of drainage facilities, landscaping and street lighting prior to first certificate of occupancy.
57. The Applicant is responsible for resolving any conflicts with existing or proposed easements. All easement(s) of record and proposed easements shall be shown on the grading plan, site plan and other improvement plans. Easements of record not shown on the approved site plan exhibit shall be relinquished or relocated as necessary for construction as shown on the approved site plan. Portions of the site which are affected by any easements which cannot be relinquished or relocated as necessary to resolve conflicts with the easement holders’ rights may be required to be redesigned. Final clearance may be required from easement holders prior to approval of final plans.
Applicant/Developer shall obtain all necessary easements required for the project to be constructed and provide for proper drainage as may be applicable to the satisfaction of the City Engineer.
58. Where survey monuments exist, such monuments shall be protected or shall be referenced and reset, pursuant to Business and Professions Code, Sections 8700 to 8805 (Land Surveyors Act).
59. The Applicant shall comply with the City of Hemet Municipal Code Section 82-172 which requires undergrounding of existing overhead utility lines along the frontage of the project. This also applies to existing overhead lines which are not over 34.5 kilovolts within and along the project frontage and between the nearest poles offsite in each direction of the project site.
60. Applicant/Developer shall pay all applicable developer impact fees, including but not limited to WRCOG TUMF and City of Hemet DIF at the currently adopted rate prior to issuance of a building permit.
61. Applicant/Developer shall pay Stephen’s Kangaroo Rat Fee to the City at a rate of $500 per gross acre, or at the currently adopted rate.
62. The Applicant/Developer shall post, with the Engineering Department, a bond, cash deposit, or letter of credit from a financial institution subject to regulations of the State and/or Federal Government for grading that exceeds 5,000 CY.
63. No grading permit shall be issued until the entitlement cases associated with this subdivision are approved and are in effect.
64. Property owner shall require any future tenants to abide by the City of Hemet truck routes.
This includes provisions that the City of Hemet can change the truck routes throughout the City, and the tenant will direct traffic to those revised routes.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
Onsite
65. The Applicant/Developer shall submit a project specific Precise Grading Plan (PGP) for approval of the City Engineer. The plans shall be prepared in accordance with the City of Hemet Standard Specifications for Public Works Construction, City of Hemet Standard Drawings, and the City of Hemet Grading and Erosion Control Standards. As part of the Grading Plan submittal, the Owner/Applicant shall submit an Erosion Control Plan. PGP shall incorporate construction plans for post-construction BMP facilities and features.
Grading shall conform to the California Building Code, as adopted by the City of Hemet and Hemet Municipal Code Chapter 67, Grading, Sediment and Erosion Control, and all other applicable laws, rules, and regulations governing grading in the city of Hemet and state of California.
66. In instances where a grading plan involves import or export, prior to obtaining a grading permit, the applicant shall have obtained approval for the import/export location from the Building and Safety department. If an Environmental Assessment, prior to issuing a grading permit, did not previously approve either location, a Grading Environmental Assessment shall be submitted to the Planning Director for review and comment and to the Building and Safety Department Director for approval. Additionally, if the movement of import/export occurs using city streets, the review and approval of the haul routes by the City Engineer will be required and a Haul Route permit issued therefore.
67. The Precise Grading shall provide that the parking lot be designed in accordance with the City of Hemet Parking Lot Design Criteria contained in the City of Hemet Standard Specification for Public Works Construction, Standards P-400 and P-401, Uniform Building Code Title 24 and in accordance with Chapter 90, Article XL of the Hemet Municipal Code. The plans shall include paving, curbs, gutters, walkways, parking lot lighting per lighting standard specifications, parking lot striping and marking, and required parking lot landscaping and planter areas.
68. The Precise Grading Plan shall provide that the trash enclosure(s) be designed in accordance with the City of Hemet Standard Specifications for Public Works Construction, Standards R-500 through R-503J. The location(s) and route of solid waste collection vehicles shall be approved by the City of Hemet Refuse Supervisor.
69. Lots which propose retaining walls greater than 30 inches measured from lowest finish grade will require separate permits(s).
70. A restrictive covenant shall be recorded to restrict the use of APN 465-140-042 as an accessory to APN 465-140-043, and shall require approvals by the Community Development Department (Planning Division) upon any potential change of use.
71. Applicant shall construct a 20’ access road to APN 465-140-032 at the sole cost of the applicant. The applicant shall maintain the roadway until a 20’ wide dedication is made
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
to the City. The dedication shall be done prior to bond release.
Offsite
72. All streets shall be designed and constructed in accordance with the Standard Specifications for Public Works Construction, Latest Edition, City of Hemet Public Works Standard Specifications, City Engineering Standards and Manuals and applicable City Standards, and all applicable laws, rules and regulations all per plans approved by the City Engineer. Project will be in substantial conformance with the existing 0.3% slope along Warren Road. This design may require additional inlets due to the street slope.
73. All driveway approaches shall be designed and constructed in accordance with the Standard Specifications for Public Works Construction, Latest Edition, City of Hemet Public Works Standard Specifications, Standard Street Sections and applicable Engineering Standards C-210A, and all applicable laws, rules and regulations all per plans approved by the City Engineer. In accordance with City of Hemet Resolution No. 1783 driveway widths and locations shall be approved by the City Engineer.
74. Street AC pavement shall be designed and constructed with structural section for a Traffic Index (TI) as specified for the street classification and R-value as determined by preliminary soils investigation. The final pavement section constructed shall be calculated with the R-value of the prepared subgrade determined in-situ and TI as the final pavement section design is approved by the City Engineer. Pavement shall be a minimum thickness of AC over a minimum thickness base as specified for the street classification and type. Pavement shall be constructed in two courses, with no course being less than 1.5”. If the cap is not paved within 2 weeks, the base course shall be a minimum of 4” to support construction traffic.
75. Streetlights shall be per Street Light Plans approved by the City Engineer and all current City standards to include City’s current standard for LED lighting fixture for the respective classification of the street.
76. Existing ADA ramps, sidewalks, or other ADA paths of travel fronting the project site shall be reconstructed as necessary to meet current ADA requirements.
77. Existing City streets, which require reconstruction or other construction work within the street shall always remain open for through traffic with proper lane shifts or adequate detours, all to the satisfaction of the City Engineer.
78. Owner/Applicant shall construct or install all improvements required in the public right-ofway to the satisfaction of the City Engineer and provide as-built (record) drawings.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
79. Owner/Applicant shall replace any sidewalk, curb and gutter, drive approach, AC pavement or other improvement damaged during construction as determined necessary by the City Engineer.
80. Any offsite grading required as a part of the project will require permission from that property owner and documentation on file with the City. Any access required, whether for water or other necessities for construction, that goes through any offsite property will require permission from the offsite property owner with documentation on file with the City prior to issuance of a grading permit.
81. Traffic signals, if required, shall be designed and constructed in accordance with Caltrans standard plans and specifications, latest edition unless otherwise approved by the City Engineer.
82. The Applicant/Developer shall prepare plans for all improvements in the public right-ofway for the following streets:
a) Simpson Avenue is designated as a Secondary 4U west of Warren Road and a Collector 2U east of Warren Road per the City of Hemet General Plan. The west side shall have a 47’ half-street right-of-way, and the east side shall have a 33’ half-street right-of-way. The 47’ half-street right-of-way shall continue through the intersection of Warren Road, and then taper east of the proposed driveway on Simpson Avenue. Applicant/developer shall dedicate all necessary right-of-way along the project frontage. Any gates proposed across the driveway shall be setback a minimum of 55-feet from the roadway to preclude interference with through travel while longer vehicles await gate opening. Improvements along Simpson road shall include AC pavement, striping, markings, PCC curb and gutter, sidewalk, streetlights, parkway landscaping, irrigation, and street trees. North of the centerline the applicant shall construct a minimum of 20’ of asphalt pavement. b) Warren Road is designated as a Secondary 2U with a right-of-way of 94’ feet.
Applicant/Developer shall dedicate the necessary right-of-way, if needed, to ensure 94’ right-of-way. Applicant shall construct full width street improvements including AC pavement, striping, markings, PCC curb and gutter, sidewalk, streetlights, parkway landscaping, irrigation, and street trees.
c) Applicant shall pay fair share for the traffic signal at Warren Road and Simpson Road. d) Access to APN 465-140-032 within the 20 foot right-of-way dedication shall be paved.
Pavement structural section shall be consistent with the City of Hemet standard specifications and the recommendation of the geotechnical engineer. e) Applicant shall construct 1,000 linear feet of roadway rehabilitation improvements west along Simpson Road from the project site’s western most boundary. This shall include Grind and Overlay at a minimum, or as recommended by a geotechnical report. f) Applicant shall construct 1,000 linear feet of roadway rehabilitation improvements north along Warren Road from the project site’s northern most boundary. This shall include Grind and Overlay at a minimum, or as recommended by a geotechnical report.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
g) Applicant shall repair roadway pavement between Salt Creek Bridge and Domenigoni Parkway. This shall include Grind and Overlay at a minimum, or as recommended by a geotechnical report.
83. Applicant/developer shall install street trees per City standards (generally 40-feet oncenter or as otherwise approved by the City Engineer) in accordance with the City Approved Street Tree list. Additional automatic irrigation system with service for power and water from meters separate from the site will be required as directed by City public works. The applicant will include this in the annexation to a CFD.
84. Applicant shall fund or construct 1,000 linear feet of the regional running trail along the Salt Creek Trail along project’s frontage.
85. Applicant shall contribute $50,000 to the City of Hemet for studying the Domenigoni Parkway Median Project.
86. Developer shall contribute $75,000 to the City of Hemet for the City’s Traffic Signal Synchronization Project for a radius of 2 miles of signals to the project boundaries.
Drainage/WQMP
87. The project is located within a Riverside County Flood Control & Water Conservation District (RCFC&WCD) Hemet Regional Master Drainage Plan area and Salt Creek Channel-South Hemet Area Drainage Plan for which Area Drainage Plan (ADP) fees are payable to RCFC&WCD. The Applicant must contact RCFC&WCD located at 1955 Market St, Riverside, CA and PRIOR TO ISSUANCE OF OCCUPANCY PERMIT (COO), provide proof of payment (or exemption) from RCFC&WCD.
88. Subdivider shall obtain an encroachment permit from RCFC&WCD for connection to its facilities.
89. The Grading Plan shall provide for increased runoff mitigation for the of the 100-year/3- hour storm in that the 100-year, 3-hour storm event for the post-project condition is retained onsite. All storm water conveyance improvements or facilities shall be designed to handle the peak flow from a 100-year event. Calculations shall be provided for approval of the City Engineer. The report shall be prepared consistent with the Storm Drain Criteria and Drainage Design Manual.
90. All offsite flows tributary to the project site and to the project frontage along Simpson Avenue and/or Warren Road shall be analyzed. Any offsite flows that currently flow through the project site shall be intercepted and conveyed through the project or into the appropriate MDP facility per the West Hemet Master Drainage Plan. The project shall analyze the impacts of the construction of the street improvements, curb, gutter and sidewalk.
91. Cross-lot drainage shall not be allowed. All pads shall be designed to drain to the streets, unless otherwise approved by the City Engineer. Storm water shall be collected in an appropriate storm drain system. All drainage easements are subject to City acceptance for maintenance as determined by the City Engineer.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
92. All drainage and storm drain improvements shall be designed in accordance with the City of Hemet Storm Drain Criteria and Drainage Design Manual. Drainage facilities shall be designed to accommodate 100-year, 1-hour storm flows. Drainage facilities outletting from sump conditions shall be designed to convey the tributary 100-year storm flows and additionally an emergency overflow escape route shall also be provided.
93. The Southwest Hemet Master Drainage Plan Line J is located on the westerly portion of the project site, Lateral B-1 immediately adjacent to the project site within Simpson Road, and Line I at the easterly boundary of the project site. Per the response letter from RCFC&WCD, dated April 11, 2023, the project shall construct these facilities, and RCFC&WCD shall take over ownership of the facilities. The project shall coordinate with RCFC&WCD on the design of the system, and shall have approval of the storm drain improvement plans from RCFC&WCD.
94. Any storm drain systems larger than 36” that are in the public right-of-way, or are a designated MDP facility, shall be owned and maintained by RCFC&WCD.
95. Catch basins shall be design and located per the City of Hemet Storm Drain Criteria and Drainage Design Manual, Section 6.
96. All storm drain inlets shall include trash capture devices.
97. The storm water retention basins within the boundaries of project shall be maintained by property owner.
98. The Applicant shall prepare a Storm Water Pollution Prevention Plan (SWPPP) for construction projects disturbing one acre or more, and shall apply for coverage under the State’s NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (General Permit, current Amendment), and any more current orders. The Applicant shall provide the project specific WDID number on the Grading Plan.
99. The Developer shall submit a “Project Specific” WQMP for each phase of the development prior to issuance of any building or grading permits for approval of the City Engineer. A template for this report is indicated as ‘Exhibit A available on-line at www.floodcontrol.co.riverside.ca.us under Programs and Services, Stormwater Quality.
A final Project Specific WQMP must be approved by the City Engineer and Covenant and Agreement for Maintenance and Operation of BMP Facilities shall be entered into with the City and be recorded. This plan shall address Site Design BMPs, incorporate the applicable Source Control BMPs, incorporate Treatment Control BMPs, describe the long-term operation and maintenance requirements for BMPs needing long-term maintenance, and describe the mechanism for funding the long-term operation and
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
maintenance of the BMPs. If Clean Water Act, Section 401 Water Quality Certification is necessary for the project, the Regional Water Quality Control Board may require additional water quality measures. A signed and notarized BMP Agreement shall be provided to the City of Hemet.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
100. A Registered Civil Engineer shall submit to the City Engineer a written certification that all the components of the approved WQMP have been satisfactory installed and constructed. Certification shall be as to grade, elevations, plantings, materials, and other elements included in the approved WQMP and include as-built drawings.
Sewer/Water
101. Applicant/Developer shall coordinate with affected utility companies and obtain any permits as necessary for the development of this project. The project is located within the Eastern Municipal Water District (EMWD) sewer and water service area. Applicant is advised to contact City of Hemet Water Department and obtain a “Will Serve” letter for both water and sewer services.
102. Applicant/developer shall comply with all relevant standards, policies and procedures and pay all fees as applicable at the time for obtaining and activating all services to serve the project.
Final Map
103. When changes to an approved Tentative Map are proposed, a Substantial Conformance Exhibit, in the same scale as the Tentative Map, shall be submitted for review and approval by the City Engineering and Community Development Director. 104. Should this project lie within any assessment/benefit district, the subdivider shall, prior to recordation, make application for and pay for their reapportionment of` the assessments or pay the unit fees in the benefit district unless said fees are deferred to building permit. 105. The subdivider shall enter into a Subdivision Improvement Agreement (SIA) with the City, on forms approved by the City Attorney, whereby the applicant agrees to construct the public improvements specified therein, unless in compliance with the provisions of the Subdivision Map Act all public improvements have been constructed and accepted by the agency. All public improvements shall be guaranteed by the provision of security, in compliance with the provisions of the Subdivision Map Act and City requirements if the improvements have not been fully completed and accepted by the City. All improvements shall be guaranteed by securities for Faithful Performance, and Labor & Materials, each for 100% of the City Engineer’s approved cost estimate. Cash deposit with the City as security for subdivision monumentation. 106. The subdivider shall show on the Final map any easements required for utilities. 107. The subdivider shall show on the Final Map the dedication of all rights-of-way necessary for the construction of all drainage facilities, streets, and public utilities, unless otherwise approved by the City Engineer. Sufficient right-of-way shall be dedicated at the intersection of Simpson Road and Warren Road to be consistent with the City of Hemet General Plan Amendment TIA 15-002.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
108. The subdivider, at its sole expense, shall obtain all rights-of-way and/or easement necessary to fully implement any portion of the approved tentative map, including public improvements prior to the City’s consideration of the final map which encompasses the particular improvement.
109. The subdivider shall comply with Subdivision Map Act Section 66436(A)(3) and shall provide “non-interference letters” (NILs) from public entities or utilities to the satisfaction of the City Engineer.
110. Final Map shall be prepared by a California registered Land Surveyor or qualified Civil Engineer and submitted to the Engineering Department for review and approval. A Title Report dated within 30 days of submittal and Subdivision Guarantee prepared for subdivision of the property, the traverse closures for the existing subdivision boundary and lots created therefrom, and copies of all applicable record documents shall be submitted with the Final Map to the Engineering Department as part of the review of the map.
111. Subdivider is required to prepare or caused to be prepared improvement plans for all public improvement for approval of the City Engineer.
112. Any easements necessary for the West Hemet MDP Facilities shall be shown on the final map or dedicated per separate instrument prior to certificate of occupancy.
Public Works
Landscaping in Right-of-Way
113. In all parkways, median strips and other areas of public right-of-way where landscaping and/or irrigation installation is required, the following requirements apply unless specifically modified in writing by the city engineer.
a. Prior to installation of any irrigation sprinkler system or landscaping within the public right-of-way, landscape plans shall be submitted to the city engineer for review and approval.
b. The irrigation system within the public right-of-way shall be in accordance with the City of Hemet Municipal Code.
c. Tree and planting materials within the public right-of-way shall be in accordance with Section III.8 of the City of Hemet Public Works Department Standard Specifications. Trees shall be installed 40 feet off center. (Must be 24 in. box, min. 1 ¾ caliper.
114. No Turf shall be allowed, only drought tolerant shrubs and groundcover. 115. Parkways must be free of all debris (asphalt, rocks, concrete, and trash) and existing soil must be rototilled to a depth of 4” – 6” prior to installation of plant material. 116. All planters shall receive 4” of shredded bark mulch, “forest floor” 0-2” or approved equal.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
Refuse Requirements
117. The City of Hemet has an exclusive Franchise Agreement with CR&R Inc. to collect and dispose of all waste including commercial, residential and construction debris within the City of Hemet. Contact CR&R at 1-800-755-8112 to set up a solid waste collection service.
118. The waste hauler may utilize the El Sobrante, Lamb Canyon, and or/or the Badlands Landfill for disposal.
119. Builders must recycle and or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition waste in accordance with the 2019 California Green Building Standards Code.
120. AB 341 – All businesses that generate 4 or more cubic yards of waste per week must make arrangements for recycling collection services with CR&R or donate, sell and/or self-haul their recyclables to a recycling facility.
• Source separate recyclable and/or compostable material from solid waste and donate or self-haul the material to recycling facilities. • Subscribe to a recycling service with waste hauler.
• Provide recycling service to tenants (if commercial or multi-family complex). • Demonstrate compliance with requirements of California Code of Regulations Title 14.
121. AB 1826 – All businesses that generate 4 or more cubic yards of waste per week must make arrangements for organics collection services with CR&R or donate, sell and/or haul their recyclables and organics to a recycling yard, and shall take at least one of the following actions in order to divert organic waste from disposal:
• Source separate organic material from all other recyclables and donate or selfhaul to a permitted organic waste processing facility. Enter into a contract or work agreement with gardening or landscaping service provider or refuse hauler to ensure the waste generated from those services meet the requirements of AB 1826.
122. AB 75 – State’s mandate of 50% solid waste diversion from landfill • The use of mulch and/or compost in the development and maintenance of landscaped areas within the project boundaries is recommended. Recycle green waste through either onsite composting of grass, i.e., leaving the grass clippings on the lawn, or sending separated green waste to a composting facility. • Consider xeriscaping and the use of drought tolerant low maintenance vegetation in all landscaped areas of the project.
• Hazardous materials are not accepted at the Riverside County landfills. Any hazardous wastes, including paint, used during construction must be properly disposed of at a licensed facility in accordance with local, state and federal regulations. For further information regarding the determination, transport, and
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
disposal of hazardous waste, please contact the Riverside County Department of Health, Environmental Protection and Oversight Division, at 1.888.722.4234.
FIRE DEPARMENT CONDITIONS
The City of Hemet enforces the California Code of Regulations (CCR), Title 24, Part 9, 2022 California Fire Code with local amendments. In addition, CCR Title 19 requirements may be applicable. The design professional should refer to these provisions for guidance when developing project drawings and specifications. Unless specifically stated herein, these conditions shall not be construed to permit or allow deviation from any Federal or State laws nor any of the local codes and ordinances adopted by this jurisdiction.
The following conditions apply to the proposed project:
123. Addressing:
a. Location: Address numbers or letters shall be displayed above the eve line of the building on the upper ¼ portion of the building or in a location on the building approved by the Fire Department. Required address signs on building shall be placed at a height and location of the building to be readily visible from the public street fronting the building at all times. Required address signs shall not be placed at a height or location on the building where the address sign is visually obstructed, confused or camouflaged by other structures or buildings, building structural or decorative features, windows, glazing, or by expected locations of parked or stopped vehicles, other signs, trees or other existing or potential obstruction. Obstructions which are installed or occur after a required address sign is approved and installed, the Fire Department may require the relocation of the required address sign, or the removal of the obstruction. Height of any numeral or letter must be 1/10 taller than the setback distance measured in feet, expressed in inches, but in no case smaller than 6 inches in height. Width or stroke of any portion of a number or letter must be 1/10 of its height but no less than .5-inch stroke. The width of any figure must be ½ its height. Suite numbers shall be a minimum 6-inch suite numbers, with a minimum .5-inch stroke, shall b located on the front and back doors. When address is located on monument sign in compliance with this section a maximum 12-inch height and maximum 2-inch stroke width maximum is allowed.
b. Illumination: All addresses required to be displayed on a building or other permanent structure shall be illuminated during all hours of darkness. The source of illumination shall be controlled by a photoelectric device which causes the address to be illuminated automatically during all hours of darkness. Timer based control devices are not allowed to be used for the purposes of controlling address illumination. The address may be illuminated by a light source placed behind, within, or near the address. Examples of acceptable light sources include selfcontained illuminated signs, landscape lighting decorative exterior building lighting and advertising lighting. The power source for illumination of the address identification must be under the control of the building or property owner.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
Illumination from other ambient or nearby sources, such as streetlights, advertising signs on nearby buildings, or other sources not controlled by the building or property owner are not considered sufficient for the purpose of required address illumination.
c. Format: All required address identification shall be displayed in a horizontal format. When numbers are used as part of the address, the number shall be displayed by using numerical characters and not by using letters to spell the number(s). The style or font of the character used shall be of a style or font which provides characters which are clear and easily recognizable. d. Materials: Materials used to display the address shall be made of a weatherresistant material such as wood or plastic. 124. Fire Flow: Fire flow shall be in accordance with the 2022 CA Fire Code Table B105.1(2), with a 50% reduction allowed for fire sprinklers. Hydrant quantity and spacing shall be in accordance with 2022 CA Fire Code Table C102.1. Hydrants must be at least 40 feet from the building.
125. Fire access roads shall be at least 26 feet wide, with an inside turning radius of 20 feet and an outside turning radius of 40 feet. Fire lanes on site plan are only 20 feet wide.
Access roads shall comply with Appendix D of the 2022 CFC. 126. Any automatic gates shall be Opticom activated or have a KNOX auto key switch installed. Any manual gate shall have a KNOX padlock or KNOX box installed adjacent to the gate with a key to the gate lock inside. Note that although not within scope of Fire, but as a courtesy, the Police Department has their own KNOX key and should be added wherever there is a Fire KNOX key switch.
127. Fire sprinklers designed in compliance with 2022 NFPA 13 are required. 128. A fire alarm monitoring system designed in compliance with 2022 NFPA 72 is required. 129. A fire command center for fire department operations shall be provided and designed in accordance with CFC Section 508. The fire command center shall be located near the front (street side) entrance of the building.
130. New buildings shall have approved radio coverage for emergency responders within the building based on the existing coverage levels of the public safety communication system of the city. A radio study shall be prepared to assess existing and proposed signal strength and clarity and shall provide specific recommendations to the developer to achieve compliance. Findings from the study shall be on all building plans submitted for review and approval. If the study finds that adequate levels of radio coverage cannot be provided, the building shall be equipped with an emergency radio responder coverage system and equipment shall be installed in accordance with CFC Section 510. 131. Smoke and heat removal is required for buildings with high piled storage where the exit access travel distance exceeds 250 sq. ft. A separate permit is required for high piled
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
storage and shall be in accordance with CFC Chapter 32 and NFPA 13. 132. All utility rooms shall be clearly labeled with 6-inch lettering and red in color for fire protection equipment.
133. Fire extinguishers shall be installed with no more than 75 ft travel distance on the interior of the building.
134. The following submittals will be required to be reviewed by the Fire Department, in this sequence, as applicable:
a. A Fire Master Plan which illustrates fire access, turning radiuses, firefighter hose lays and fire hydrant locations. A copy of this plan, once approved, shall be included in the architectural plan submittal.
b. Architectural plans.
c. Fire service underground plans.
d. Fire sprinkler plans.
e. Fire alarm plans.
f. High piled storage plans.
MITIGATION MEASURES
135. Plan, Program, or Policy PPP AE-1: Exterior Lighting. All lighting shall be directed or shielded away from nearby residential zones and contained within the boundaries of the site. Adequate lighting shall be provided to maintain a safe, on-site environment consistent with California Building Code (CBC) standards. 136. Plan, Program, or Policy PPP AQ-1: SCAQMD Rule 403. The following measures shall be incorporated into construction plans and specifications as implementation of SCAQMD Rule 403:
• All clearing, grading, earth-moving, or excavation activities shall cease when winds exceed 25 mph per SCAQMD guidelines in order to limit fugitive dust emissions.
• The contractor shall ensure that all disturbed unpaved roads and disturbed areas within the Project are watered at least three (3) times daily during dry weather.
Watering, with complete coverage of disturbed areas, shall occur at least three times a day, preferably in the mid-morning, afternoon, and after work is done for the day.
• The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are reduced to 15 miles per hour or less.
137. Plan, Program, or Policy PPP AQ-3: Rule 402. The Project is required to comply with the provisions of South Coast Air Quality Management District (SCAQMD) Rule 402. The Project shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or safety of any such persons or the public, or which cause, or have a
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
natural tendency to cause, injury or damage to business or property. 138. Mitigation Measure BIO-1: A pre-construction/ clearance burrowing owl survey shall be performed not more than 30 days prior to initial ground disturbance activity to determine presence/absence of the species. A qualified biologist shall survey the Project site and a buffer zone, 500-feet outside the Project limits for burrows that could be used by burrowing owls. If the burrow is determined to be occupied, the burrow shall be flagged, and a 160-foot diameter buffer shall be established during nonbreeding season or a 250- foot diameter buffer during the breeding season. If burrows onsite are unoccupied, construction may proceed.
If the site survey determines the presence of burrowing owl, mitigation in accordance with the California Department of Fish and Wildlife (CDFW) shall be implemented as follows:
• If burrowing owls are identified as being resident on-site outside the breeding season (September 1 to February 14) they may be relocated to other sites by a permitted biologist (permitted by CDFW), as allowed in the CDFW Staff Report on Burrowing Owl Mitigation (March 2012).
• If an active burrow is found during the breeding season, the burrow shall be treated as a nest site and temporary fencing shall be installed at a distance from the active burrow, to be determined by the biologist, to prevent disturbance during grading or construction. Installation and removal of the fencing shall be done with a biological monitor present.
• Active relocation and eviction/passive relocation shall require the preservation and maintenance of suitable burrowing owl habitat determined through coordination with the Wildlife Agencies.
139. Mitigation Measure BIO-2: Nesting Bird Survey. Vegetation removal should occur outside of the nesting bird season (generally between February 1 and August 31). If vegetation removal is required during the nesting bird season, the applicant shall conduct take avoidance surveys for nesting birds prior to initiating vegetation removal/clearing. Surveys shall be conducted by a qualified biologist(s) within three days of vegetation removal. If active nests are observed, a qualified biologist shall determine appropriate minimum disturbance buffers and other adaptive mitigation techniques (e.g., biological monitoring of active nests during construction-related activities, staggered schedules, etc.) to ensure that impacts to nesting birds are avoided until the nest is no longer active. At a minimum, construction activities shall stay outside of a 200-foot buffer around the active nests. The approved buffer zone shall be marked in the field with construction fencing, within which no vegetation clearing or ground disturbance shall commence until the qualified biologist and Riverside County Environmental Programs Department verify that the nests are no longer occupied, and the juvenile birds can survive independently from the nests. Once the young have fledged and left the nest, or the nest otherwise becomes inactive under natural conditions, normal construction activities may occur.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
140. Mitigation Measures Mitigation Measure 4.3-1a: Fugitive Dust Emissions. The City shall implement the following measures to reduce the amount of fugitive dust that is reentrained into the atmosphere from parking lots and construction sites. Require the following measures to be taken during the construction of all projects to reduce the amount of dust and other sources of PM10, in accordance with SCAQMD Rule 403:
a. Dust suppression at construction sites using vegetation, surfactants, and other chemical stabilizers Wheel washers for construction equipment. b. Watering down of all construction areas
c. Limit speeds at construction sites to 15 miles per hour d. Cover aggregate or similar material during transportation of material. e. Adopt incentives, regulations, and/or procedures to reduce paved road dust emissions through targeted street sweeping of roads subject to high traffic levels and silt loadings.
141. Mitigation Measure AQ 4.3-1b: Reduce Exhaust Emissions from Construction Equipment. The City shall require each project applicant, as a condition of project approval, to implement the following measures to reduce exhaust emissions from construction equipment emissions:
a. Commercial electric power shall be provided to the project site in adequate capacity to avoid or minimize the use of portable gas-powered electric generators and equipment.
b. Where feasible, equipment requiring the use of fossil fuels (e.g., diesel) shall be replaced or substituted with electrically driven equivalents (provided that they are not run via a portable generator set).
c. To the extent feasible, alternative fuels and emission controls shall be used to further reduce exhaust emissions. - On-site equipment shall not be left idling when not is in use.
d. The hours of operation of heavy-duty equipment and/or the amount of equipment in use at any one time shall be limited.
e. Staging areas for heavy-duty construction equipment shall be located as far as possible from sensitive receptors.
f. Before construction contracts are issued, the project applicants shall perform a review of new technology, in consultation with SCAQMD, as it relates to heavyduty equipment, to determine what (if any) advances in emissions reductions are available for use and are economically feasible. Construction contract and bid specifications shall require contractors to utilize the available and economically feasible technology on an established percentage of the equipment fleet. It is anticipated that in the near future, both NOX and PM10 control equipment will be available.
g. Provide temporary traffic controls such as a flag person during all phases of construction to maintain smooth traffic flow.
h. Provide dedicated turn lanes for movement of construction trucks and equipment
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
on- and offsite.
i. Reroute construction trucks away from congested streets or sensitive receptor areas.
j. Appoint a construction relations officer to act as a community liaison concerning on-site construction activity, including resolution of issues related to PM10 generation.
k. Improve traffic flow by signal synchronization and ensure that all vehicles and equipment will be properly tuned and maintained according to manufactures’ specifications.
l. Use coatings and solvents with a VOC content lower than that required under AQMD Rule 1113.
m. Construct or build with materials that do not require painting or require the use of pre-painted construction materials where feasible.
n. Require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil import/export). If the City determines that 2010 model year or newer diesel trucks cannot be obtained, the lead agency shall use trucks that meet EPA 2007 model year NOx and PM emissions requirements. o. During project construction, all internal combustion engines or construction equipment operating on the project site shall meet EPA-Certified Tier 2 emissions standards or higher. A copy of each unit’s certified tier specification, BACT documentation, and CARB or SCAQMD operating permit shall be provided at the time of mobilization for each applicable unit of equipment. p. Encourage construction contractors to apply for AQMD “SOON” funds. 142. Mitigation Measure 4.3-1e: Reduce Exposure of Sensitive Receptors. The City shall implement the following measures to minimize exposure of sensitive receptors and sites to health risks related to air pollution:
a. Encourage the applicants for sensitive land uses to incorporate design features (e.g., pollution prevention, pollution reduction, barriers, landscaping, ventilation systems, or other measures) in the planning process to minimize the potential impacts of air pollution on sensitive receptors.
b. Activities involving idling trucks shall be oriented as far away from and downwind of existing or proposed sensitive receptors as feasible. c. Strategies shall be incorporated to reduce the idling time of diesel engines through alternative technologies such as IdleAire, electrification of truck parking, and alternative energy sources for Transport Refrigeration Units (TRUs)to allow diesel engines to be completely turned off.
143. Mitigation Measure CUL-1: Prior to ground disturbing activity, the applicant shall retain the services of a registered professional archaeologist (RPA), to conduct archaeological monitoring of all mass grading and trenching activities. The Project Archaeologist shall have the authority to temporarily redirect earthmoving activities in the event that suspected archaeological resources are unearthed during Project construction.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
144. Mitigation Measure CUL-2: A Cultural Resource Management Plan (CRMP), shall be developed by the Project Archaeologist and the contractor, in coordination with the Soboba Band of Luiseno Indians, and City, to thoroughly describe how the project mitigation measures and conditions of approval will be implemented during the course of project related ground disturbing activities. The CRMP will be subject to the approval of the City prior to the issuance of the grading permit. Details in the Plan shall include:
a. Appropriate measures for avoidance and preservation of cultural resources as determined necessary.
b. The protocols and stipulations to be followed in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that may be subject to a cultural resource evaluations. c. Treatment of inadvertent discoveries limited to basic recordation and nondestructive analysis. d. Pre-grading meeting with the City, the construction manager and any contractors, including but limited to a mandatory Workers Environmental Awareness Training (WEAP) to those in attendance. The Training will include a brief review of the cultural sensitivity of the Project and the surrounding area; what resources could potentially be identified during earthmoving activities; the requirements of the monitoring program; the protocols that apply in the event inadvertent discoveries of cultural resources are identified, including who to contact and appropriate avoidance measures until the find(s) can be properly evaluated; and any other appropriate protocols.
145. Mitigation Measure TCR-1: Prior to the issuance of a grading permit, and prior to the commencement of ground disturbing activity, the applicant shall secure an agreement with the Soboba Band of Luiseno Indians for Tribal Monitoring and the Treatment and Disposition of all Tribal Cultural Resources, and tribally associated artifacts discovered within the project boundaries. Native American Monitor(s) from the Soboba Band of Luiseno Indians shall conduct monitoring of all ground disturbing activities associated with the project. The Native American Monitor(s) shall have the authority to temporarily redirect earthmoving activities in the event that suspected archaeological resources are unearthed during project construction.
146. Mitigation Measure TCR-2: In the event that Native American cultural resources are discovered during the course of grading (inadvertent discoveries), the following procedures shall be carried out for final disposition of the discoveries:
a. One or more of the following treatments, in order of preference, shall be employed. Evidence of such shall be provided to the City:
i. Preservation-In-Place of the cultural resources, if feasible. Preservation in
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
place is defined as avoiding the resources, leaving them in the place they were found with no development affecting the integrity of the resources. ii. Onsite reburial of the discovered items. This shall include measures and provisions to protect the future reburial area from any future impacts in perpetuity. Reburial shall not occur until all legally required cataloging and basic recordation have been completed. No recordation of sacred items is permitted without the written consent of the Soboba Band of Luiseno Indians. The location for the future reburial area shall be identified on a confidential exhibit on file with the City, and concurred to by the Soboba Band of Luiseno Indians prior to certification of the environmental document.
147. Mitigation Measure TCR-3: Discovery of Human Remains: In accordance with Section 7050.5 of the California Health and Safety Code, if human remains (or remains that may be human) are discovered at the project site during grading or earthmoving, the construction contractors, project archaeologist, and/or designated Native American Monitor shall immediately stop all activities within 100 feet of the find. The project proponent shall then inform the Riverside County Coroner and the City of Hemet Planning Department immediately. The coroner shall be permitted to examine the remains as required by California Health and Safety Code Section 7050.5(b). Section 7050.5 requires that excavation be stopped in the vicinity of discovered human remains until the coroner can determine whether the remains are those of a Native American. If human remains are determined as those of Native American origin, the applicant shall comply with the state regulations relating to the disposition of Native American burial that fall within the jurisdiction of the NAHC (PRC Section 5097). The coroner shall contact the NAHC to determine the most likely descendant(s). The MLD shall complete his or her inspection and make recommendations or preferences for treatment within 48 hours of being granted access to the site. The Disposition of the remains shall be overseen by the most likely descendant(s) to determine the most appropriate means of treating the human remains and any associated grave artifacts, in consultation with the property owner and the lead agency.
148. Plan, Program, or Policy PPP E-1: CalGreen Compliance: The Project is required to comply with the CalGreen Building Code (CBC) to ensure efficient use of energy.
CalGreen specifications are required to be incorporated into building plans as a condition of building permit approval. This includes conformance with the provision of designated preferred parking spaces for low-emitting, fuel-efficient and carpool/vanpool vehicles (see CBC Table 5.106.5.2; “Clean Air/Vanpool/EV” for the project) as well as EV Ready spaces (see CBC Table 5.106.5.3.3;). In addition, bike parking and racks shall be required per CBC 5.106.4.1 (5% of the number of parking spaces). 149. PPP GEO-1: CBC Compliance. The Project is required to comply with the California Building Standards Code (CBC) as included in Chapter 14, Article II, Division 3, Section 14-40 of the HMC to preclude significant adverse effects associated with seismic and soils hazards. CBC related and geologist and/or civil engineer specifications for the proposed Project are required to be incorporated into grading plans and building specifications as a condition of construction permit approval.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
150. Mitigation Measure PAL-1: Paleontological Monitoring. Prior to the issuance of grading permits, the Applicant shall provide a letter to the City, or City designee, from a professional paleontologist, stating that a qualified paleontologist (who meets the Society of Vertebrate Paleontology’s (SVP, 2020) definition for qualified profession paleontologist) has been retained to provide services for the proposed Project. The paleontologist shall develop a Paleontological Resources Impact Mitigation Plan (PRIMP) to mitigate the potential impacts to unknown buried paleontological resources that may exist onsite. The PRIMP shall be provided to the City for review and approval.
The PRIMP shall require that the paleontologist be present at the pre-grading conference to establish procedures for paleontological resource surveillance. Prior to commencement of grading activities, the City of Hemet Planning Division, or designee, shall verify that all Project grading and construction plans specify the requirements herein related to the PRIMP and the unanticipated discovery of paleontological resources.
The PRIMP shall also require that in areas mapped as late to middle Pleistocene old alluvial fan deposits, monitoring shall be conducted full-time in undisturbed alluvium starting at the surface. In areas mapped as Holocene to late Pleistocene young alluvial valley deposits, monitoring shall be conducted full-time in undisturbed alluvium starting at a depth of five feet below the surface during grading or excavation activities. In the event paleontological resources are encountered, ground disturbing activity within 50 feet of the area shall cease. The paleontologist shall examine the materials encountered, assess the nature and extent of the find, and recommend a course of action to further investigate and protect or recover and salvage those resources that have been encountered pursuant to the guidelines of the Society of Vertebrate Paleontology (SVP, 2010).
Criteria for discarding specific fossil specimens shall be made explicit in the PRIMP. If the qualified paleontologist determines that impacts to a sample containing significant paleontological resources cannot be avoided by Project construction, then recovery techniques shall be applied. Actions include recovering a sample of the fossiliferous material prior to construction, monitoring construction activities and halting construction if an important fossil needs to be recovered, and/or cleaning, identifying, and cataloging specimens for curation and research purposes. Recovery, salvage, and treatment shall be done at the Applicant’s expense. All recovered and salvaged resources shall be prepared to the point of identification and permanent preservation by the paleontologist.
Resources shall be identified and curated into an established accredited professional repository. The paleontologist shall have a repository agreement in hand prior to initiating recovery of the resource. If no institution accepts the fossil(s), they shall be donated to a local school in the area for educational purposes. Accompanying notes, maps, and photographs shall also be filed at the repository and/or school. A report documenting the results of the monitoring, including any salvage activities and the significance of any fossils, shall be prepared and submitted to the City, or City designee.
The report and inventory, when submitted to the City of Hemet Planning Division, shall signify completion of the program to mitigate impacts to paleontological resources. 151. Mitigation Measure GHG-1: Prior to the issuance of each building permit, the Project
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
Applicant shall provide the City of Hemet with sufficient evidence demonstrating all light bulbs and light features within the Project are Energy Star certified. 152. Mitigation Measure GHG-2: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating the building will provide water efficient toilets (1.5 gallons per minute [gpm]). 153. Mitigation Measure GHG-3: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating the building will provide waterless urinals.
154. Mitigation Measure GHG-4: Prior to the issuance of each building permit, the Project Applicant shall provide the City of Hemet with sufficient evidence demonstrating the building will provide water efficient faucets (1.28 gpm). 155. Mitigation Measure GHG-5: Legible, durable, weather-proof signs shall be placed at truck access gates, loading docks, and truck parking areas of the warehouse portion of the Project that identify applicable California Air Resources Board (CARB) anti-idling regulations. At a minimum, each sign shall include: 1) instructions for truck drivers to shut off engines when not in use; 2) instructions for drivers of diesel trucks to restrict idling to no more than five (5) minutes once the vehicle is stopped, the transmission is set to "neutral" or "park," and the parking brake is engaged; and 3) telephone numbers of the building facilities manager and the CARB to report violations. Prior to the issuance of an occupancy permit, the City shall conduct a site inspection to ensure that the signs are in place.
156. Mitigation Measure GHG-6: Prior to issuance of a building permit, the Project Applicant shall provide the City with an onsite signage program that clearly identifies the required onsite circulation system. This shall be accomplished through posted signs and painting on driveways and internal roadways.
157. Mitigation Measure GHG-7: Prior to issuance of an occupancy permit, the City shall confirm that signs clearly identifying approved truck routes have been installed on Simpson Road and Warren Road.
158. Mitigation Measure GHG-8: Prior to issuance of an occupancy permit, the Project Applicant shall install a sign on the property with telephone, email, and regular mail contact information for a designated representative of the tenant who would receive complaints about excessive noise, dust, fumes, or odors. The sign shall also identify contact data for the City for perceived Code violations. The tenant’s representative shall keep records of any complaints received and actions taken to communicate with the complainant and resolve the complaint. The tenant’s representative shall endeavor to resolve complaints within 72 hours.
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
159. Mitigation Measure GHG-9: All on-site outdoor cargo-handling equipment (including yard trucks, hostlers, yard goats, pallet jacks, forklifts, and other on-site equipment) shall be electric or non-diesel fueled. All on-site indoor forklifts shall be powered by electricity. 160. Mitigation Measure GHG-10: Prior to tenant occupancy for each building/occupancy each owner/tenant shall develop a use/occupant-specific transportation demand management (TDM) program. The TDM program shall be submitted to the City Planning Division and City Building & Safety Division for review and approval as part of tenant improvements plan(s) documentation. Recommended California Air Pollution Control Officers Association (CAPCOA) TDM program elements are listed below:
• Provide pedestrian and bicycle network improvements within the development connecting to existing off-site facilities.
• Where applicable ensure design of key intersections and roadways encourage the use of walking, biking and where applicable transit. • Commute trip reduction (CTR) programs offered to encourage the use of vanpools, carpooling, public transit, and biking.
161. Plan, Program, or Policy PPP HYD-1: NPDES/SWPPP. Since this Project is one acre or more, the permit holder shall comply with all of the applicable requirements of the National Pollutant Discharge Elimination System (NPDES) and shall conform to NPDES Best Management Practices for Stormwater Pollution Prevention Plans (SWPPP) during the life of this permit. Prior to issuance of any grading or construction permits - whichever comes first - the Applicant shall provide the Building and Safety Department evidence of submitting a Notice of Intent (NOI), develop and implement a SWPPP and a monitoring program and reporting plan for the construction site. 162. Plan, Program, or Policy PPP HYD-2: WQMP. Prior to the approval of the Grading Plan and issuance of Grading Permits a completed Water Quality Management Plan (WQMP) shall be submitted to and approved by the City Building and Safety Department. The WQMP shall identify all Post-Construction, Site Design, Source Control, and Treatment Control Best Management Practices (BMPs) that will be incorporated into the development Project in order to minimize the adverse effects on receiving waters. 163. Plan, Program, or Policy PPP NOI-1: Construction Noise. Chapter 30, Article II, Section 30-32(33) of the HMC permits construction activities between the hours of 6:00 a.m. and 6:00 p.m. during the months of June through September and between the hours of 7:00 a.m. and 6:00 p.m. during the months of October through May. Exceptions to these standards may be granted only by the City’s building official and/or the City Council.
Construction occurring consistent with these provisions is exempt from regulation. 164. PDF NOI-1: All construction activities shall comply with HMC Section 30-32[a][43],
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
restricting construction activities to the approved hours of construction as set forth on a permit or other city entitlement as issued by the City’s building official, Planning Commission, or City Council, or as otherwise prohibited by the Hemet Building Code. 165. PDF NOI-2: Construction contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers, consistent with manufacturers’ standards).
166. PDF NOI-3: All stationary construction equipment shall be placed in such a manner so that the emitted noise is directed away from any sensitive receivers. 167. PDF NOI-4: Construction equipment staging areas shall be located at the greatest feasible distance between the staging area and the nearest sensitive receivers. 168. PDF NOI-5: The construction contractor shall limit equipment and material deliveries to the same hours specified for construction equipment.
169. PDF NOI-6: Electrically powered air compressors and similar power tools shall be used, when feasible, in place of diesel equipment.
170. PDF NOI-7: No music or electronically reinforced speech from construction workers shall be allowed.
171. Plans, Program, or Policy PPP PS-1: School Impact Fees. Prior to the issuance of either a certificate of occupancy or prior to building permit final inspection, the applicant shall provide payment of the appropriate fees set forth by the Hemet Unified School District related to the funding of school facilities pursuant to Government Code Section 65995 et seq.
172. PDF TR-1: Sidewalks. The Project would construct sidewalks along the Project’s frontage on Simpson Road and Warren Road.
173. Mitigation Measure BIO-1: A pre-construction/clearance California glossy snake survey shall be performed not more than 30 days prior to initial ground disturbance activity to determine presence/absence of the species. A qualified biologist will survey the Project site and a buffer zone, 500-feet outside the project limits for glossy snakes. If any California glossy snake is found on site during the preconstruction survey a qualified biologist will relocate the snake to the nearest available offsite area with suitable habitat. 174. Mitigation Measure BIO-2: A pre-construction/ clearance burrowing owl survey shall be performed not more than 30 days prior to initial ground disturbance activity to determine presence/absence of the species. A qualified biologist will survey the Project site and a
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
buffer zone, 500-feet outside the project limits for burrows that could be used by burrowing owls. If the burrow is determined to be occupied, the burrow will be flagged, and a 160-foot diameter buffer will be established during nonbreeding season or a 250- foot diameter buffer during the breeding season. If burrows onsite are unoccupied, construction may proceed.
If the site survey determines the presence of burrowing owl, mitigation in accordance with the California Department of Fish and Wildlife CDFW shall be implemented as follows:
a. If burrowing owls are identified as being resident on-site outside the breeding season (September 1 to February 14) they may be relocated to other sites by a permitted biologist (permitted by CDFW), as allowed in the CDFW Staff Report on Burrowing Owl Mitigation (March 2012).
b. If an active burrow is found during the breeding season, the burrow shall be treated as a nest site and temporary fencing shall be installed at a distance from the active burrow, to be determined by the biologist, to prevent disturbance during grading or construction. Installation and removal of the fencing shall be done with a biological monitor present.
c. Active relocation and eviction/passive relocation require the preservation and maintenance of suitable burrowing owl habitat determined through coordination with the Wildlife Agencies.
175. Mitigation Measure BIO-3: Vegetation removal activities shall be conducted outside the nesting season (September 1 to February 14 for songbirds; September 1 to January 14 for raptors) to avoid potential impacts to nesting birds. Any construction activities that occur during the nesting season (February 15 to August 31 for songbirds; January 15 to August 31 for raptors) will require that all suitable habitats be thoroughly surveyed for the presence of nesting birds by a qualified biologist within three days before commencement of vegetation clearing/ground disturbance activities. If any active nests are detected a buffer of 500 feet of an active listed species or raptor nest, 300 feet of other sensitive bird nests (non-listed), and 100 feet of most common songbird nests will be delineated, flagged, and avoided until the nesting cycle is complete. The buffer may be modified and/or other recommendations proposed as determined appropriate by the biological monitor to minimize impacts.
176. Mitigation Measure PAL-1: Paleontological Monitoring. Prior to the issuance of grading permits, the Applicant shall provide a letter to the City, or City designee, from a professional paleontologist, stating that a qualified paleontologist (who meets the Society of Vertebrate Paleontology’s (SVP, 2020) definition for qualified profession paleontologist) has been retained to provide services for the proposed Project. The paleontologist shall develop a Paleontological Resources Impact Mitigation Plan (PRIMP) to mitigate the potential impacts to unknown buried paleontological resources that may exist onsite. The PRIMP shall be provided to the City for review and approval.
The PRIMP shall require that the paleontologist be present at the pre-grading conference to establish procedures for paleontological resource surveillance. Prior to commencement of grading activities, the City of Hemet Planning Division, or designee,
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
shall verify that all Project grading and construction plans specify the requirements herein related to the PRIMP and the unanticipated discovery of paleontological resources.
The PRIMP shall also require that in areas mapped as late to middle Pleistocene old alluvial fan deposits, monitoring shall be conducted full-time in undisturbed alluvium starting at the surface. In areas mapped as Holocene to late Pleistocene young alluvial valley deposits, monitoring shall be conducted full-time in undisturbed alluvium starting at a depth of five feet below the surface during grading or excavation activities. In the event paleontological resources are encountered, ground disturbing activity within 50 feet of the area shall cease. The paleontologist shall examine the materials encountered, assess the nature and extent of the find, and recommend a course of action to further investigate and protect or recover and salvage those resources that have been encountered pursuant to the guidelines of the Society of Vertebrate Paleontology (SVP, 2010).
Criteria for discarding specific fossil specimens shall be made explicit in the PRIMP. If the qualified paleontologist determines that impacts to a sample containing significant paleontological resources cannot be avoided by Project construction, then recovery techniques shall be applied. Actions include recovering a sample of the fossiliferous material prior to construction, monitoring construction activities and halting construction if an important fossil needs to be recovered, and/or cleaning, identifying, and cataloging specimens for curation and research purposes. Recovery, salvage, and treatment shall be done at the Applicant’s expense. All recovered and salvaged resources shall be prepared to the point of identification and permanent preservation by the paleontologist.
Resources shall be identified and curated into an established accredited professional repository. The paleontologist shall have a repository agreement in hand prior to initiating recovery of the resource. If no institution accepts the fossil(s), they shall be donated to a local school in the area for educational purposes. Accompanying notes, maps, and photographs shall also be filed at the repository and/or school. A report documenting the results of the monitoring, including any salvage activities and the significance of any fossils, shall be prepared and submitted to the City, or City designee.
The report and inventory, when submitted to the City of Hemet Planning Division, shall signify completion of the program to mitigate impacts to paleontological resources. 177. Mitigation Measure NOI-1: The City shall require future developments to implement the following measures to reduce the potential for human annoyance and architectural/structural damage resulting from elevated groundborne noise and vibration levels.
a. Pile driving within a 50-foot radius of historic structures shall utilize alternative installation methods where possible (e.g., pile cushioning, jetting, predrilling, cast-in-place systems, resonance-free vibratory pile drivers). b. The preexisting condition of all designated historic buildings within a 50- foot radius of proposed construction activities shall be evaluated during a preconstruction survey. The preconstruction survey shall determine conditions that exist before construction begins for use in evaluating damage caused by construction activities. Fixtures and finishes within a 50-foot radius of
7.A.
City of Hemet –Draft Conditions of Approval
Newland Simpson Project
construction activities susceptible to damage shall be documented (photographically and in writing) prior to construction. All damage shall be repaired back to its preexisting condition.
c. Vibration monitoring shall be conducted prior to and during pile driving operations occurring within 100 feet of the historic structures. Every attempt shall be made to limit construction-generated vibration levels in accordance with Caltrans recommendations during pile driving and impact activities in the vicinity of the historic structures.
Status: Satisfied through the project-specific Noise and Vibration Impact Analysis prepared October 2022 by LSA (LSA 2022) and included as Appendix I which determined that while pile driving is not proposed within 50 feet of a historic structure, as a condition of approval, construction of the proposed Project would not use large bulldozers or loaded heavy trucks within 30 feet of surrounding residential uses. Based on information from the manufacturer Caterpillar, a large bulldozer is a D9 and larger (53 tons or more). With the operation of smaller bulldozers within 35 feet of surrounding structures, vibration levels are expected to be less than 0.04 in/sec RMS.
END
7.A.
Simpson Project Aerial Map
Project Site
7.A.
CUP 22-006 & GPA 22-003
Simpson Project Zoning Map
Project Site
7.A.
Mixed Use Area #4 General Plan
7.A.
CUP 22-006 & GPA 22-003
Simpson Project GP Map
Project Site
7.A.
W ,
Simpson Rd 7‘ (40%)i
LEGEND D ProiectSite
ProiectDriveway
m Truck Trip Distribution
7.A.
FILER
Chereese Johnson
[email protected]
(951) 765-2432
FILING FOR
The Press-Enterprise
OFFICIAL AD PROOF
This is the proof of your ad scheduled to run in The Press-Enterprise on the dates indicated below.
If changes are needed, please contact us prior to deadline at (951) 368-9229.
Notice ID: GTZ2cccGyG0rDaSciojk | Proof Updated: Feb. 24, 2026 at 03:51pm PST Notice Name: PHN Newland Simpson Project | Publisher ID: 0011780741 This is not an invoice. Below is an estimated price, and it is subject to change. You will receive an invoice with the final price upon invoice creation by the publisher.
Columns Wide: 4
Total Column Inches: 42.32
Number of Lines: 109
Ad Class: Legals
02/27/2026: City Notices Notice 756.10
Subtotal $756.10
Tax $0.00
Processing Fee $0.00
Total $756.10
See Proof on Next Page
PHN Newland Simpson Project - Page 1 of 3
7.A.
PHN Newland Simpson Project - Page 2 of 3
7.A.
PHN Newland Simpson Project - Page 3 of 3
7.A.
City of Hemet
City Council Meeting
STAFF REPORT
Meeting: City Council Meeting - Mar 10 2026
Department: Finance
Submitted by: Mark Prestwich, City Manager
Tiffany Barnett, Administrative Services Director;
☒ Receive and File ☐ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:
The City of Hemet Warrant Registers for February 12, 2026, February 17, 2026, and February 19, 2026, and Periodic Payroll Payments
RECOMMENDED ACTION:
It is respectfully recommended that the City Council:
Receive and file the City of Hemet Warrant Registers and Periodic Payroll Payments.
BACKGROUND:
To ensure transparency, warrant registers listing all vendor payments made during a check cycle and periodic payroll payments are presented to the City Council to receive and file.
ANALYSIS:
Warrant Registers:
February 12, 2026, in the amount of $375,481.93
February 17, 2026, in the amount of $425,000.00
February 19, 2026, in the amount of $1,247,869.90
There were no checks issued in excess of $500,000 for this reporting period.
Periodic Payroll Payments:
February 2, 2026 - February 15, 2026, in the amount of $1,145,064.75 STRATEGIC PLAN INTEGRATION:
8.A.
GOAL THREE: COMMUNITY ENGAGEMENT
To connect and participate in a constant dialogue between members of the community, City staff, and elected officials to promote togetherness and positivity.
Objective 1: Deliver messaging to the Community that connects, is consistent, and relevant.
Objective 2: Increase transparency for the public.
Objective 3: Increase the community's pride within the City.
GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.
Objective 1: Operate in a financially sustainable manner.
Objective 2: Evaluate existing practices to ensure continuity with industry best practices.
Objective 3: Provide Council with policies that are consistent while lessening liabilities.
Objective 4: Increase employee retention by training and creating a positive workplace.
Objective 5: Streamline fire prevention coordination efforts.
FISCAL IMPACT:
All funds dispersed have been appropriated in the City's fiscal year budget.
ATTACHMENT(S):
Attachment 1: 021226 CHECK RUN REPORT
Attachment 2: 021726 CHECK RUN REPORT
Attachment 3: 021926 CHECK RUN REPORT
8.A.
City of Hemet
ACCOUNTS PAYABLE CHECK RUN REPORT
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
DATE: 02/12/2026 CHECK RUN: 021226 AMOUNT:$ 375,481.93
I, Tiffany Barnett, Administrative Services Director, do hereby certify under penalty of perjury, that the materials have been furnished, the services rendered or the labor performed as described herein, and that the claim is a just, due and unpaid obligation against the City of Hemet, and that I am authorized to authenticate and certify to said claim.
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
97634 9TH SHIELD INCORPORATED PARK SECURITY PATROL SERV 3,000.00 73965 AARDVARK PD SWAT TEAM SUPPLIES 4,592.18
92494 AETNA HEALTH OF CALIFORNIA AETNA COMBINED 1011 158,567.03 67343 AMERICAN FORENSIC NURSES INC PD PHLEBOTOMIST SERVICES 77.00 11526 ANADY'S TROPHIES & ENGR INC FD ENGRAVING 315.87
69018 ANIMAL MEDICAL CENTER VET SERVICES 90.00
69018 ANIMAL MEDICAL CENTER VET SERVICES 401.97
99114 BATTERY WORX INC VEHICLE BATTERIES 785.12
87976 BOONE RECYCLED MATERIALS, INC RECYCLING DUMP FEES 330.00 66525 CARL WARREN & COMPANY LIABILITY CLAIMS TPA 7,901.16 98746 CASTANEDA PD PER DIEM- EXCON EXPLOR 364.00
17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 60.00 17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 60.00 17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 60.00 17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 60.00 17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 60.00 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 75.00 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 125.00 17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 60.00 17920 CASTELLANO'S TOWING TOWING SERVICES FOR GOVER 90.00 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 105.00 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 105.00 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 156.25 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 60.00 17920 CASTELLANO'S TOWING PD EVIDENCE TOWING SERVIC 125.00 75249 CINTAS PD FIRST AID CABINET 79.07
97736 CLIENTFIRST TECHNOLOGY CONSULT Hemet Public Library - Ne 633.75 89153 CORTESE PW SUPPLIES FOR CLEAN UP 68.81
19062 CRAFCO INC CRACK SEAL AND HP ASPHALT 2,564.83
19062 CRAFCO INC CRACK SEAL AND HP ASPHALT 2,496.73
19062 CRAFCO INC CRACK SEAL AND HP ASPHALT 2,269.75
19092 CURRY COPY CENTER PD RUBBER STAMP 38.06
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 45.00
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 50.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 90.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 45.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 90.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 90.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 100.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 51.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 51.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 75.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 135.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 75.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 226.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 75.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 90.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 221.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 70.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 130.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 70.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 46.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 46.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 100.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 40.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 45.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 50.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 40.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 70.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 130.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 70.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 70.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 221.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 85.00
96015 FIRE APPARATUS SOLUTIONS PARTS AND SUPPLIES 315.79 88743 GOLDSTAR ASPHALT PRODUCTS ASPHALT MAINTENANCE SUPPL 459.47 99332 GREENCAT INC B2507-112 PARTIAL REFUND 310.46
99332 GREENCAT INC B2509-017 PARTIAL REFUND 308.96
99332 GREENCAT INC B2511-177 PARTIAL REFUND 313.75
80187 HAVLICK FD PARKING REIMBFOR LADDE 114.00
18626 HEMET, CITY OF WATER DEPT WATER BILLS 81.50
18626 HEMET, CITY OF WATER DEPT WATER BILLS 116.20
18626 HEMET, CITY OF WATER DEPT WATER BILLS 106.76
18626 HEMET, CITY OF WATER DEPT WATER BILLS 107.08
18626 HEMET, CITY OF WATER DEPT WATER BILLS 105.71
18626 HEMET, CITY OF WATER DEPT WATER BILLS 104.99
18626 HEMET, CITY OF WATER DEPT WATER BILLS 96.97
18626 HEMET, CITY OF WATER DEPT WATER BILLS 88.84
18626 HEMET, CITY OF WATER DEPT WATER BILLS 217.01
18626 HEMET, CITY OF WATER DEPT WATER BILLS 88.84
18626 HEMET, CITY OF WATER DEPT WATER BILLS 275.80
18626 HEMET, CITY OF WATER DEPT WATER BILLS 849.52
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 160.38
18626 HEMET, CITY OF WATER DEPT WATER BILLS 109.73
18626 HEMET, CITY OF WATER DEPT WATER BILLS 247.34
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 48.39
18626 HEMET, CITY OF WATER DEPT WATER BILLS 95.02
18626 HEMET, CITY OF WATER DEPT WATER BILLS 121.18
18626 HEMET, CITY OF WATER DEPT WATER BILLS 182.30
18626 HEMET, CITY OF WATER DEPT WATER BILLS 168.46
18626 HEMET, CITY OF WATER DEPT WATER BILLS 104.99
18626 HEMET, CITY OF WATER DEPT WATER BILLS 56.20
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 51.07
18626 HEMET, CITY OF WATER DEPT WATER BILLS 48.87
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 81.50
18626 HEMET, CITY OF WATER DEPT WATER BILLS 5,775.04
18626 HEMET, CITY OF WATER DEPT WATER BILLS 102.63
18626 HEMET, CITY OF WATER DEPT WATER BILLS 268.51
18626 HEMET, CITY OF WATER DEPT WATER BILLS 47.29
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 48.24
18626 HEMET, CITY OF WATER DEPT WATER BILLS 48.24
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 37.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 136.37
18626 HEMET, CITY OF WATER DEPT WATER BILLS 91.52
18626 HEMET, CITY OF WATER DEPT WATER BILLS 48.24
18626 HEMET, CITY OF WATER DEPT WATER BILLS 139.72
18626 HEMET, CITY OF WATER DEPT WATER BILLS 105.23
18626 HEMET, CITY OF WATER DEPT WATER BILLS 48.24
18626 HEMET, CITY OF WATER DEPT WATER BILLS 91.24
99111 JOHN HARRISON CONTRACTING B2509-057 PARTIAL REFUND 199.10 99945 KYLE SANDEFER FIRE CERTIFICATION REIMBU 500.00
19095 L N CURTIS & SONS Hand tools for Type 6 - C 920.95 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 61.73 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 78.77 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 59.08 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 330.15 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 143.19 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 47.59 38761 LAKE HEMET MUNICIPAL WATER DIS DEPT WATER BILLS 78.77 94801 LEXISNEXIS RISK SOLUTIONS ACCURNIT VIRTUAL CRIME CE 1,213.99 78558 LIEBERT CASSIDY WHITMORE LABOR ATTORNEY SERVICES 3,940.50 82468 LOWE'S OF HEMET STORE #1556 FD Misc operational suppl 175.52 98432 MARTINEZ PD PER DIEM- EXCON EXPLOR 364.00
48477 O C L C INC Cloud Library platform an 514.03
1 FINAL TOUCH CONSTRUCTION PARTIAL PERMIT FOR B2601- 530.66 1 EMPOWER HOME SERVICES B2601-083 PERMIT PARTIAL 762.91 1 DEVIL DOG ENERGY B2601-208 PARTIAL REFUND 779.05
1 OPTION ONE SOLAR B2510-218 REFUND 198.00
30380 OVERNIGHT INDUSTRIAL SUPPLY, JANITORIAL SUPPLIES 101.36 91105 PAEZ PD LCW CONFERENCE HOTEL & 1,005.82
94367 PARKHOUSE TIRE, INC TIRES, TUBES, SUPPLIES & 1,084.02 94367 PARKHOUSE TIRE, INC TIRES, TUBES, SUPPLIES & 846.16 94367 PARKHOUSE TIRE, INC TIRES, TUBES, SUPPLIES & 1,053.78 94367 PARKHOUSE TIRE, INC TIRES, TUBES, SUPPLIES & 1,246.82
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
12114 READYREFRESH PD DRINKING WATER 234.75
92760 RIGHT OF WAY INC TRAFFIC SAFETY EQUIPMENT 1,501.97 58450 SMART & FINAL PD JAIL & BREAKROOM FOOD 598.71
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 94.63
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 322.15
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 33.69
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 138.86
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 211.44
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 43.95
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 30.23
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 155.28
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 13.57
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 59.61
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 56.45
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 91.23
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 17.33
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 173.61
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 23.34
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 1,307.58 59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 343.46
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 171.01
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 145.81
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 76.08
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 21.71
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 16.10
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 164.91
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 80.31
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 21.76
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 17.33
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 15.54
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 53.18
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 33.10
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 36.21
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 37.98
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 96.34
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 230.83
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 15.46
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 16.49
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 255.00
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 54.78
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 22.49
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 86.22
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 526.84
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 6,895.15 59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 8,903.59 59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 5,190.43 59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 2,808.65
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 760.73
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 87.56
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 362.74
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 29.73
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 44.48
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 24.72
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 15.16
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 28.02
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 42.55
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 104.58
59150 SOUTHERN CALIFORNIA GAS CO NATURAL GAS 683.34
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 80.44
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 41.65
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 71.35
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 1,104.88
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 230.14
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 28.66
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 138.31
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 85.38
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 119.68
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 907.97
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 564.08
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 59.84
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 13.81
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 16.11
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 434.98
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 14.30
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 227.66
59150 SOUTHERN CALIFORNIA GAS CO GAS BILLS 1,182.77
60258 STATE WATER RESOURCES (SWRCB) Certification Renewal for 60.00 97918 SUNRUN INSTALLATION B2510-045 PARTIAL REFUND 821.27 79158 THOMSON REUTERS PD CLEAR PROFLEX GOV LAW 435.75
99807 TRIPEPI SMITH AND ASSOCIATES I General communications, m 585.00 74609 U S BANK ADMIN FEES - HEMET REDEV 874.50
91112 UNIFIRST CORP UNIFORM CLEANING SVC 72.45
91112 UNIFIRST CORP UNIFORM CLEANING SVC 40.38
91112 UNIFIRST CORP PD JAIL BLANKET CLEANING 142.30
70240 VERIZON BUSINESS FIRE ADMIN & FS2 FAX-LONG 55.11
99858 VISION SERVICE PLAN EMPLOYEE VISION PLAN 2,942.45 99817 VOLTAIRE ENGINEERING INC CIP 5770 Various St Pedes 111,429.54
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021226 02/12/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
252 INVOICES CHECK RUN TOTAL 375,481.93
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021226 02/12/2026
ACCOUNT ORG DESC ACCT DESC
110.00.0000.22019. GENERAL SB 1473 BL 16.36
110.00.0000.22039. GENERAL SEISMIC MO 7.39
110.00.0000.40221. GENERAL BUILDING P 3,218.93
110.00.0000.40222. GENERAL PLUMBING P 111.00
110.00.0000.40223. GENERAL BUILDING T 11.51
110.00.0000.40291. GENERAL LICENSE VA 132.85
110.00.0000.40630. GENERAL BUILDING P 567.00
110.00.0000.40635. GENERAL PLAN STORA 6.65
110.00.0000.40636. GENERAL MICROFILM 152.47
110.00.2500.52110. GENERAL UTILITIES- 91.24
110.01.1801.52710. GENERAL PROFESSION 3,940.50
110.04.1000.52710. GENERAL PROFESSION 585.00
110.07.1000.52250. GENERAL OFFICE SUP 315.87
110.07.1000.52560. GENERAL TRAINING & 114.00
110.07.3241.52450. GENERAL MAINT & OP 98.10
110.07.3241.52560. GENERAL TRAINING & 500.00
110.08.1000.52710. GENERAL PROFESSION 633.75
110.09.1000.52560. GENERAL TRAINING & 1,005.82
110.09.1000.52700. GENERAL UNIFORMS A 5,647.01
110.09.3002.52710. GENERAL PROFESSION 77.00
110.09.3003.52710. GENERAL PROFESSION 491.97
110.09.3006.52560. GENERAL TRAINING & 728.00
110.09.3007.52250. GENERAL OFFICE SUP 38.06
110.09.3013.52265. GENERAL SOFTWARE M 1,213.99
110.09.3013.52400. GENERAL CONTRACTS 435.75
110.10.4250.52105. GENERAL UTILITIES 526.84
110.10.4250.52110. GENERAL UTILITIES- 1,027.51
110.10.4250.52400. GENERAL CONTRACTS 3,000.00
110.10.4250.52450. GENERAL MAINT & OP 68.81
FUND TOTAL 24,763.38
130.09.3005.52350. PUBSAFTOW VEHICLE SU 751.25
FUND TOTAL 751.25
221.10.4200.52105. GASTAX UTILITIES 3,801.60
221.10.4200.52450. GASTAX MAINT & OP 8,913.99
221.10.4200.52700. GASTAX UNIFORMS A 72.45
221.10.4200.53623. GASTAX VEHICLE FU 355.34
FUND TOTAL 13,143.38
222.10.5000.65500.5770E MEASUREA RIGHTS OF 56,074.27
FUND TOTAL 56,074.27
223.10.5000.65500.5770E ART3SB821 RIGHTS OF 61,195.17
223.00.0000.22015. ART3SB821 RETENTIONS -5,839.90
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021226 02/12/2026
ACCOUNT ORG DESC ACCT DESC
FUND TOTAL 55,355.27
225.11.8250.52105. LLMD UTILITIES 21,551.57
225.11.8250.52110. LLMD UTILITIES- 7,534.21
FUND TOTAL 29,085.78
227.11.8260.52105. LIGHTING UTILITIES 735.77
227.11.8261.52105. LIGHTING UTILITIES 308.22
227.11.8267.52105. LIGHTING UTILITIES 65.32
227.11.8268.52105. LIGHTING UTILITIES 59.97
227.11.8276.52105. LIGHTING UTILITIES 298.49
227.11.8279.52105. LIGHTING UTILITIES 53.18
227.11.8285.52105. LIGHTING UTILITIES 14.15
227.11.8266.52105. LIGHTING UTILITIES 421.66
227.11.8282.52105. LIGHTING UTILITIES 17.33
227.11.8288.52105. LIGHTING UTILITIES 249.41
227.11.8289.52105. LIGHTING UTILITIES 42.55
227.11.8297.52105. LIGHTING UTILITIES 22.79
227.11.8287.52105. LIGHTING UTILITIES 80.31
227.11.8292.52105. LIGHTING UTILITIES 15.16
227.11.8290.52105. LIGHTING UTILITIES 23.66
227.11.8301.52105. LIGHTING UTILITIES 271.49
227.11.8306.52105. LIGHTING UTILITIES 56.45
FUND TOTAL 2,735.91
228.11.8265.52105. LANDSCAPE UTILITIES 30.23
228.11.8266.52105. LANDSCAPE UTILITIES 32.31
228.11.8268.52105. LANDSCAPE UTILITIES 27.59
228.11.8267.52105. LANDSCAPE UTILITIES 29.31
228.11.8270.52105. LANDSCAPE UTILITIES 13.57
228.11.8273.52110. LANDSCAPE UTILITIES- 126.36
228.11.8279.52105. LANDSCAPE UTILITIES 15.54
228.11.8283.52110. LANDSCAPE UTILITIES- 61.73
228.11.8285.52105. LANDSCAPE UTILITIES 19.54
228.11.8262.52110. LANDSCAPE UTILITIES- 59.08
228.11.8312.52105. LANDSCAPE UTILITIES 28.02
FUND TOTAL 443.28
232.07.2000.52450.00114 PSGRANT MAINT & OP 77.42
232.07.2000.65400.00126 PSGRANT MAJOR MACH 920.95
FUND TOTAL 998.37
254.10.4600.53623. SEWERSTORM VEHICLE FU 102.50
254.10.4650.52105. SEWERSTORM UTILITIES 104.58
254.10.4650.52700. SEWERSTORM UNIFORMS A 40.38
254.10.4650.53623. SEWERSTORM VEHICLE FU 102.50
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021226 02/12/2026
ACCOUNT ORG DESC ACCT DESC
FUND TOTAL 349.96
363.08.6101.52226. LIBRARYFAC BOOKS-AUDI 514.03
FUND TOTAL 514.03
496.00.8005.54300. REDEVELOP FISCAL AGE 874.50
FUND TOTAL 874.50
571.10.9000.52105. WATER UTILITIES 154.96
571.10.9000.52450. WATER MAINT & OP 708.76
571.10.9000.52560. WATER TRAINING & 60.00
571.10.9000.53623. WATER VEHICLE FU 102.50
FUND TOTAL 1,026.22
680.01.1935.52200. IT TELEPHONE/ 55.11
FUND TOTAL 55.11
682.00.2150.52500. DENTVISINS INSURANCE, 2,942.45
FUND TOTAL 2,942.45
683.00.2200.52400. LIABILITY CONTRACTS 7,901.16
FUND TOTAL 7,901.16
684.10.4550.52350. FLEETMAINT VEHICLE SU 5,391.69
684.10.4550.52400. FLEETMAINT CONTRACTS 390.00
684.10.4550.53623. FLEETMAINT VEHICLE FU 20.50
FUND TOTAL 5,802.19
685.10.4560.52105. FACMAINT UTILITIES 1,538.41
685.10.4560.52110. FACMAINT UTILITIES- 2,936.61
685.10.4560.52115. FACMAINT UTILITIES- 5,322.01
685.10.4560.52400. FACMAINT CONTRACTS 4,200.00
685.10.4560.52450. FACMAINT MAINT & OP 101.36
FUND TOTAL 14,098.39
689.00.2150.52400. OPEB CONTRACTS 155,375.03
FUND TOTAL 155,375.03
750.00.0000.22153. PAYROLLDEP MED INS PA 3,192.00
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/12/2026 14:36
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021226 02/12/2026
ACCOUNT ORG DESC ACCT DESC
FUND TOTAL 3,192.00
CHECK RUN SUMMARY TOTAL 375,481.93
** END OF REPORT - Generated by KARA FRANZO **
8.A.
City of Hemet
ACCOUNTS PAYABLE CHECK RUN REPORT
Report generated: 02/17/2026 14:19
User: kfranzo
Program ID: apwarrnt
DATE: 02/17/2026 CHECK RUN: 021726 AMOUNT:$ 425,000.00
I, Tiffany Barnett, Administrative Services Director, do hereby certify under penalty of perjury, that the materials have been furnished, the services rendered or the labor performed as described herein, and that the claim is a just, due and unpaid obligation against the City of Hemet, and that I am authorized to authenticate and certify to said claim.
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/17/2026 14:19
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021726 02/17/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
98644 AMBER PEREZ RELEASE SETTLEMENT 425,000.00
1 INVOICES CHECK RUN TOTAL 425,000.00
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/17/2026 14:19
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021726 02/17/2026
ACCOUNT ORG DESC ACCT DESC
683.00.2200.52722. LIABILITY LIABILITY 425,000.00
FUND TOTAL 425,000.00
CHECK RUN SUMMARY TOTAL 425,000.00
** END OF REPORT - Generated by KARA FRANZO **
8.A.
City of Hemet
ACCOUNTS PAYABLE CHECK RUN REPORT
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
DATE: 02/19/2026 CHECK RUN: 021926 AMOUNT:$ 1,247,869.90 I, Tiffany Barnett, Administrative Services Director, do hereby certify under penalty of perjury, that the materials have been furnished, the services rendered or the labor performed as described herein, and that the claim is a just, due and unpaid obligation against the City of Hemet, and that I am authorized to authenticate and certify to said claim.
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
95266 2 HOT ACTIVEWEAR & UNIFORMS FIRE DEPT UNIFORMS & GEAR 436.98 96645 4LEAF INC Fire Prevention services 3,697.50
96645 4LEAF INC FIRE INSPECTOR II JAN 202 15,080.00
98398 5 STAR PLUMBING HEATING & AIR CITY HALL REPLACEMENT OF 23,495.00 97634 9TH SHIELD INCORPORATED PW CORP YARD SECURITY PAT 500.00 97634 9TH SHIELD INCORPORATED Library Security Services 2,030.00 98850 ACCEL WIRELESS GIBBEL PARK INTERNET 65.00
97450 AEP-CALIFORNIA LLC REPAIRS 105.00
95074 AIR & HOSE SOURCE INC PW PARTS AND SUPPLIES 289.31 76776 ALL AMERICAN ASPHALT COLD MIX, SAND, AND BASE 1,471.75 98030 ALLSTATE BENEFITS ALLSTATE CRITICAL ILLNESS 1,935.92 79612 AMAZON.COM Admin Svcs Office Supplie 81.37
99940 AMERICAN EAGLE TROPHIES PLAQUE FOR RYAN WEBB 65.25 67343 AMERICAN FORENSIC NURSES INC PD PHLEBOTOMIST SERVICES 590.00 11526 ANADY'S TROPHIES & ENGR INC NAME PLATE 14.14
13566 B & W PIPE & SUPPLY PLUMBING PARTS & LANDSCAP 689.99 99114 BATTERY WORX INC VEHICLE BATTERIES 67.30
99114 BATTERY WORX INC VEHICLE BATTERIES 936.43
99839 BRIGHTVIEW LANDSCAPE SERVICES Landscape Maintenance Ser 43,184.74 99667 C R ASSOCIATES CIP 2402 SS4A CITYWIDE SA 8,966.25 99667 C R ASSOCIATES CIP 2402 SS4A CITYWIDE SA 31,552.52 32992 CALMAT CO DBA ASPHALT AND MATERIAL (FOR 386.03
32992 CALMAT CO DBA ASPHALT AND MATERIAL (FOR 553.32
32992 CALMAT CO DBA ASPHALT AND MATERIAL (FOR 288.08
93130 CANON FINANCIAL SERVICES INC PD PRINTER/COPIER LEASE 457.26 93130 CANON FINANCIAL SERVICES INC HR COPIER LEASE 366.28 93130 CANON FINANCIAL SERVICES INC PW CANON COPIER LEASE 318.00 93130 CANON FINANCIAL SERVICES INC PD PRINTER/COPIER LEASE 208.69 93130 CANON FINANCIAL SERVICES INC Finance Printer Lease and 337.32 93130 CANON FINANCIAL SERVICES INC PD PRINTER/COPIER LEASE - 183.91 93130 CANON FINANCIAL SERVICES INC PD PRINTER/COPIER LEASE 355.51 93130 CANON FINANCIAL SERVICES INC PD PRINTER/COPIER LEASE - 430.03
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
99486 CANON USA INC PD PRINTER/COPIER MAINTEN 28.45
99486 CANON USA INC PD PRINTER/COPIER MAINTEN 9.05
99486 CANON USA INC PD PRINTER/COPIER MAINTEN 63.00
99486 CANON USA INC PD PRINTER/COPIER MAINTEN .44
79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 152.01 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 333.33 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 333.33 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 333.33 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 793.19 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 333.33 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 333.33 79809 CHARTER COMMUNICATIONS CABLE/INTERNET SERVICE 333.33 97096 CHEYNE NICOT PD TRAINING PER DIEM HOMI 387.00
98778 CLEANMART USA JANITORIAL SUPPLIES 573.47
98778 CLEANMART USA JANITORIAL SUPPLIES 645.56
98778 CLEANMART USA JANITORIAL SUPPLIES 245.13
98634 COASTAL BUILDING SERVICES INC JANITORIAL SERVICES JAN 2 9,357.00 89708 COLONIAL LIFE COLONIAL IND TERM LIFE: P 1,225.30
92830 COMMERCIAL DOOR COMPANY INC REPAIRS TO FS#4 5,075.38 97310 CONCENTRA MEDICAL CENTERS PRE-EMPLOYMENT MEDICAL SE 249.00 77258 CORE & MAIN LP PIPELINE MATERIALS 299.60
61765 COUNSELING TEAM INTERNATIONAL EAP / COUNSELING / PSYCH 2,700.00 69307 COZAD & FOX, INC ON-CALL PLAN CHECK SERVIC 1,125.00 99928 CRAIG EDMONDS Council Chambers Dais Upg 20,800.00 97032 CROSSTOWN ELECTRICAL & DATA TRAFFIC SIGNAL MAINTENAN 1,446.50 19092 CURRY COPY CENTER CODE ENF FLYERS 419.61
76040 D B BACKFLOW & PLUMBING SERVIC NONCOMPLIANCE BACKFLOW TE 120.00 76040 D B BACKFLOW & PLUMBING SERVIC BACKFLOW TESTS 60.00 86716 DATA TICKET INC Data Ticket Citation Proc 272.00
19810 DEWEY PEST CONTROL PEST & TERMITE CONTROL 43.00
96677 DIAMOND ENVIRONMENTAL SERVICES S STATE ST & CHAMBERS ST 557.60
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
77516 DIRECTV DIRECTV 99.99
97618 DNA SERVICES UNLIMITED LIVESCAN ROLL FEE 75.00
13570 E S BABCOCK & SONS, INC LABORATORY TESTING OF CIT 307.83 13570 E S BABCOCK & SONS, INC LABORATORY TESTING OF CIT 206.44 13570 E S BABCOCK & SONS, INC LABORATORY TESTING OF CIT 205.95 75913 ELITE FIRE PROTECTION INC ANNUAL FIRE EXTINGUISHER 203.31 81230 ENTERPRISE RENT-A-CAR PD TRAINING RENTAL CAR 276.92 82121 F M LOCK & SAFE INC CITY WIDE LOCK AND KEYS 7.07
82121 F M LOCK & SAFE INC CITY WIDE LOCK AND KEYS 477.25 82121 F M LOCK & SAFE INC CITY WIDE LOCK AND KEYS 42.41 82121 F M LOCK & SAFE INC PARK RESTROOMS DOOR/LOCK 1,427.88 72447 FEDEX MAILING SERVICE FOR PUBLI 22.68
72447 FEDEX MAILING SERVICE FOR PUBLI 9.77
72447 FEDEX EXPRESS MAIL SERVICE 31.75
72447 FEDEX MAILING SERVICE FOR PUBLI 82.20
69102 FIRE CONDIMENT FUND FIRE CONDIMENT FUND: PAYM 3,360.00 77149 FRANCHISE TAX BOARD WAGE ASSIGNMENT: PAYMENT 150.00 94495 FRONTIER PHONE BILLS 76.99
94495 FRONTIER PHONE BILLS 105.48
94495 FRONTIER PHONE BILLS 171.91
94495 FRONTIER PHONE BILLS 21.74
94495 FRONTIER PHONE BILLS 418.05
93053 FUEL SERV FUEL SYSTEM REPAIRS 1,063.40
81489 GABRIEL GOMEZ PD PARMA CONF PER DIEM 2/ 186.00
71673 GRAINGER PARTS AND SUPPLIES 314.49
71673 GRAINGER PARTS AND SUPPLIES 31.28
71673 GRAINGER PARTS AND SUPPLIES 67.94
71673 GRAINGER PARTS AND SUPPLIES 87.95
99769 H2O PARTNERS INC CIP 2514 Pavement Conditi 7,000.00 77286 HARRIS AND ASSOCIATES INC PROFESSIONAL SERVICES NOV 2,152.70 95611 HEMET BLUEPRINT CIP 5753 WATER DROP REPLA 77.21
29850 HEMET FENCE CORP CATALINA BASIN 44,221.00
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
69103 HEMET FIREFIGHTER ASSOC HEMET FIRE FIGHTER ASSOC: 16,647.58 89709 HEMET MID MANAGER'S ASSOC HEMET M ID-MANAGERS ASSOC 884.00 92386 HEMET NON-SWORN POLICE NON·SWORN POLICE EE ASSOC 1,200.00 70906 HEMET POLICE MGMT ASSOCIATION POLICE MANAGEMENT UNION: 2,340.00 69934 HEMET TRUE VALUE HARDWARE PW MAINTENANCE SUPPLIES 41.94 69934 HEMET TRUE VALUE HARDWARE PW MAINTENANCE SUPPLIES 26.08 69934 HEMET TRUE VALUE HARDWARE PW MAINTENANCE SUPPLIES 20.09 69934 HEMET TRUE VALUE HARDWARE PW MAINTENANCE SUPPLIES 23.91 69934 HEMET TRUE VALUE HARDWARE PW MAINTENANCE SUPPLIES 27.17 30608 HEMET VALLEY TOOL MIKASA MTX70 RAMMER, HOND 4,235.82 69110 HEMET, CITY OF POLICE ASSOC HEMET POLICE ASSOCIATION: 10,240.00 99910 HERRON+RUMANSOFF ARCHITECTS IN CIP 2523 St. John Archite 3,200.00 74732 HOME DEPOT CREDIT SERVICES MISC BUILDING/MAINTENANCE 501.51 74732 HOME DEPOT CREDIT SERVICES MISC BUILDING/MAINTENANCE 779.12 99019 I-SHRED INCORPORATED Shredding Services 90.00
98306 IMPERIAL SPRINKLER SUPPLY LANDSCAPE MATERIALS 745.77 98306 IMPERIAL SPRINKLER SUPPLY LANDSCAPE MATERIALS 77.93 98306 IMPERIAL SPRINKLER SUPPLY LANDSCAPE MATERIALS 579.88 32997 INLAND FOUNDATION ENGINEERING CIP 5754 DEC 2025 8,267.50 32997 INLAND FOUNDATION ENGINEERING CIP 5754 JAN 2026 6,775.00 32997 INLAND FOUNDATION ENGINEERING Engineering for GPR Surve 2,400.00 99184 INTELESYS INC PD Station to GIT Buildin 43,753.35 85019 J L C ENGINEERING & CONSUL INC CIP 2518 Salt Creek Impro 37,950.00 99297 J SMITH & T MULI INC CIP 2408 AWARDED TO J.SMI 32,132.10 95152 JESSE'S AUTO GLASS & UPHOLSTERY 1,175.00
78286 JOSIAH DOUGLAS PD PARMA CONF PER DIEM 2/ 186.00
98983 KELLEY UBELHOR PD SLI TRAINING PER DIEM 301.00
87764 LEVEL 3 COMMUNICATIONS LLC PHONE/INTERNET SERVICES 1,745.06 82339 LIFE-ASSIST, INC Emergency medical equipme 223.24 98880 LIFTECH ELEVATOR SERVICES INC ELEVATOR SERVICE AND REPA 900.00
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
83087 LITERACY PRO SYSTEMS, INC LITERACY ONLINE EDUCATION 683.00 79455 LOS ANGELES TRUCK CENTERS, LLC PARTS 96.77
82468 LOWE'S OF HEMET STORE #1556 PD MISC MAINTENANCE SUPPL 566.50 95447 MANOLO JOLINSKY WELDED FD EXCELLENCE AWARDS 250.00 99119 MARIN CONSULTING ASSOCIATE INC PD Leadership and Account 625.00 93414 MEDPRO WASTE DISPOSAL, LLC MEDICAL WASTE REMOVAL 41.42 85731 MERRIMAC PETROLEUM INC FUEL DELIVERY FIRE STATIO 1,743.46 85731 MERRIMAC PETROLEUM INC FUEL DELIVERY TO THE CORP 15,782.93 85731 MERRIMAC PETROLEUM INC FUEL DELIVERY TO CIVIC CE 22,278.25 92502 MESA FENCE CO INC Repairs to wrought iron g 2,700.00 78341 MICHAEL BAKER INTERNATIONAL CIP 5592 - MICHAEL BAKER 8,174.65 90859 N I GOVERNMENT SERVICES INC FD SATELLITE PHONE 92.90 60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 105.76
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 262.95
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 336.29
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 175.79
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 21.42
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 160.25
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 39.58
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 19.65
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 29.48
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 32.27
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 96.30
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 38.33
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 18.47
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 556.89
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 69.08
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 150.65
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 35.72
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 65.19
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 503.51
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 235.71
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 66.40
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 59.31
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 20.83
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 175.79
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 12.62
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 12.62
60450 NAPA AUTO PARTS AUTO PARTS & SUPPLIES 216.89
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
99090 NICOLAS REINEKE PD TRAINING PER DIEM HOMI 387.00
96020 NUTRIEN AG SOLUTIONS LANDSCAPE MATERIALS CHEMI 1,852.53 90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 50.00
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 55.03
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 13.87
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 16.63
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 14.78
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 18.41
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 53.33
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 9.19
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 43.49
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 57.07
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 81.55
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 123.91
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 33.81
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 168.55
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 60.86
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 166.84
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 217.05
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 50.09
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 73.77
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 19.61
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 229.36
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES 137.59
90418 O'REILLY AUTO PARTS AUTO PARTS/SUPPLIES -32.61
99067 ORANGE COUNTY WINWATER WORKS 25/26 Water and Sewer Par 127.24 99067 ORANGE COUNTY WINWATER WORKS 25/26 Water and Sewer Par 2,527.92 99067 ORANGE COUNTY WINWATER WORKS 25/26 Water and Sewer Par 1,185.20 99067 ORANGE COUNTY WINWATER WORKS 25/26 Water and Sewer Par 236.15 99641 DULCE CELIA ORTIZ WAGE ASSIGNMENT: PAYMENT 750.00 90140 P H & S PRODUCTS LLC Gloves for EMS 5,440.00
83040 P V P COMMUNICATIONS PD DUTY MOTORCYCLE HELMET 1,589.90 82115 PACKHAM & TOOMEY INC UNDERGROUND TANK INSPECTI 135.00 82115 PACKHAM & TOOMEY INC UNDERGROUND TANK INSPECTI 135.00 94436 PAM HOENIG FD LADDER OF EXCELLENCE D 91.96
94367 PARKHOUSE TIRE, INC TIRES, TUBES, SUPPLIES & 884.43 94367 PARKHOUSE TIRE, INC TIRES, TUBES, SUPPLIES & 1,086.57 98705 PEDRO AGUILA PD TRAINING PER DIEM 2/23 129.00
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
77237 PINS & NEEDLES EMBROIDERY PW EMBROIDERY SERVICES 263.72 97332 POWERSPORTS UNLIMITED INC BMW MOTORCYCLE SERVICE AN 3,364.39 98061 PUBLIC TRUST ADVISORS LLC Investment Management Ser 5,049.28 69252 R S G, INC SUCCESSOR AGENCY ANNUAL R 825.00
99579 RANCHO HYDRAULICS HOSE/PIPE FITTING/SUPPLIE 341.91 98052 RANGEL ADMIN SVCS PARMA CONF PER 263.00
12114 READYREFRESH DRINKING WATER 87.98
98297 REYNOLDS DOG GROOMING 132.00
78083 RIGHTWAY SITE SERVICES INC PORTABLE SANITATION SERVI 528.24 99183 RINGCENTRAL INC Audio Codes Maintenance 5 256.75
99183 RINGCENTRAL INC Audio Codes Maintenance 5 256.75
72071 RIVERSIDE, COUNTY OF (DEH) VECTOR CONTROL OCT-DEC 20 3,681.50 74575 RIVERSIDE, COUNTY OF (TLMA) TRAFFIC SIGNAL MAINTENANC 697.65 74575 RIVERSIDE, COUNTY OF (TLMA) TRAFFIC SIGNAL MAINTENANC 3,454.99 74575 RIVERSIDE, COUNTY OF (TLMA) TRAFFIC SIGNAL MAINTENANC 2,025.99 75335 RIVERSIDE, COUNTY OF (SHERIFF) PD TRAINING 588.00 75335 RIVERSIDE, COUNTY OF (SHERIFF) PD TRAINING BCTC 36.00 75335 RIVERSIDE, COUNTY OF (SHERIFF) PD TRAINING BCTC 36.00 75734 RIVERSIDE, COUNTY OF (PSEC) PSEC Emergency radio use 1,655.80 78360 RODOLFO'S ITALIAN CUISINE FD CATERING LADDER OF EXC 2,142.38 69109 S E I U LOCAL 721 SEIU CONTRIBUTIONS: PAYME 3,217.78 73412 S S D ALARM ALARM SERVICES 49.60
73412 S S D ALARM ALARM SERVICES 1,947.90
86439 SHERWIN-WILLIAMS CO PAINT MATERIALS AND SUPPL 142.79 86439 SHERWIN-WILLIAMS CO PAINT MATERIALS AND SUPPL 30.03 97683 SHINE CITY CAR WASH CITY VEHICLE CAR WASH 708.00
92966 SKYLINE SAFETY AND SUPPLY STREET MAINTENANCE & SAFE 206.59 99882 SOLARMAX RENEWABLE ENERGY PROV CIP 2405 Building Forward 448,914.30
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
71475 SOUTH COAST AQMD FLAT FEE FOR LAST FISCAL 170.94
71475 SOUTH COAST AQMD FS#4 EMISSIONS 170.94
71475 SOUTH COAST AQMD CITY HALL ELEC GEN DIESEL 565.63 71475 SOUTH COAST AQMD FS#4 ELEC GEN DIESEL EMIS 565.63 59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 131.95
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 100.53
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 198.50
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 89.76
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 142.43
59145 SOUTHERN CALIFORNIA EDISON ELECTRIC BILLS 19.69
95470 SOUTHERN HILL NURSERY & LANDSC LANDSCAPE MATERIALS 426.69 60003 STANDARD INSURANCE CO VOLUNTARY AD&D INS: PAYME 5,615.67 70870 STANDARD INSURANCE CO (LTD) LONG TERM DISABILITY: PAY 16,741.61 76654 STAPLES ADVANTAGE CLERK OFFICE SUPPLIES 372.54
76654 STAPLES ADVANTAGE PD OFFICE SUPPLIES 272.14
97977 T K E ENGINEERING CIP 5706 - TKE Engineerin 5,105.00 97977 T K E ENGINEERING SALT CREEK CHANNEL PARCEL 5,836.10 97977 T K E ENGINEERING CIP 2413 KIRBY ST PROTECT 335.00 97977 T K E ENGINEERING CIP 2413 KIRBY ST PROTECT 445.00 97977 T K E ENGINEERING ALL WAY STOP ANALYSIS OAK 1,635.00 97977 T K E ENGINEERING CIP 2410 CITYWIDE SLURRY 13,732.50 97977 T K E ENGINEERING CIP 2407 24.25 CITYWIDE P 67.50 97977 T K E ENGINEERING SURVEY FOR DESIGN OF CIP 1,506.20 97977 T K E ENGINEERING WATERMAIN SURVEY FOR CIP 953.90 97977 T K E ENGINEERING SURVEY FOR DESIGN OF CIP 7,617.50 97977 T K E ENGINEERING SURVEY FOR DESIGN OF CIP 11,665.00 97977 T K E ENGINEERING SURVEY FOR DESIGN OF CIP 19,225.00 93551 TARGETSOLUTIONS LEARNING, LLC FD TRAINING - MEMBERSHIP 5,120.00 92100 TIFFANY BARNETT ADMIN SVCS PARMA CONF PER 263.00
99232 TIM MORAN FORD HEMET VEHICLE PARTS AND SERVICE 263.94 99232 TIM MORAN FORD HEMET VEHICLE PARTS AND SERVICE 673.24 99232 TIM MORAN FORD HEMET VEHICLE PARTS AND SERVICE 104.07 99232 TIM MORAN FORD HEMET VEHICLE PARTS AND SERVICE 297.31 99232 TIM MORAN FORD HEMET VEHICLE PARTS AND SERVICE 1,659.57 99642 TIMOTHY MAHONEY ADA CONSULTING DEC 25 & J 2,000.00 88518 TYLER TECHNOLOGIES INC TYLER EPL SOFTWARE 1,600.00 88518 TYLER TECHNOLOGIES INC EERP 6,400.00
88518 TYLER TECHNOLOGIES INC EERP 4,800.00
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
90537 U K G KRONOS SYSTEMS LLC TELESTAFF SERVICE 17.15
74609 U S BANK ADMIN FEES - HEMET REDEV 2,862.00
63783 UNDERGROUND SERVICE ALERT OF S UNDERGROUND SERVICE ALERT 549.65 91112 UNIFIRST CORP UNIFORM CLEANING SVC 108.42
91112 UNIFIRST CORP UNIFORM CLEANING SVC 12.88
91112 UNIFIRST CORP UNIFORM CLEANING SVC 24.60
91112 UNIFIRST CORP UNIFORM CLEANING SVC 14.60
91112 UNIFIRST CORP UNIFORM CLEANING SVC 26.00
91112 UNIFIRST CORP UNIFORM CLEANING SVC 34.15
91112 UNIFIRST CORP UNIFORM CLEANING SVC 10.48
91112 UNIFIRST CORP UNIFORM CLEANING SVC 34.24
91112 UNIFIRST CORP UNIFORM CLEANING SVC 12.20
91112 UNIFIRST CORP UNIFORM CLEANING SVC 22.56
91112 UNIFIRST CORP UNIFORM CLEANING SVC 39.43
91112 UNIFIRST CORP UNIFORM CLEANING SVC 34.15
91112 UNIFIRST CORP UNIFORM CLEANING SVC 29.56
91112 UNIFIRST CORP UNIFORM CLEANING SVC 16.52
91112 UNIFIRST CORP UNIFORM CLEANING SVC 45.13
91112 UNIFIRST CORP UNIFORM CLEANING SVC 31.02
91112 UNIFIRST CORP UNIFORM CLEANING SVC 27.40
91112 UNIFIRST CORP UNIFORM CLEANING SVC 17.24
91112 UNIFIRST CORP UNIFORM CLEANING SVC 14.71
91112 UNIFIRST CORP UNIFORM CLEANING SVC 39.70
91112 UNIFIRST CORP UNIFORM CLEANING SVC 19.05
91112 UNIFIRST CORP UNIFORM CLEANING SVC 117.53
91112 UNIFIRST CORP UNIFORM CLEANING SVC 53.71
91112 UNIFIRST CORP UNIFORM CLEANING SVC 32.94
91112 UNIFIRST CORP UNIFORM CLEANING SVC 39.56
91112 UNIFIRST CORP UNIFORM CLEANING SVC 37.76
91112 UNIFIRST CORP UNIFORM CLEANING SVC 46.08
91112 UNIFIRST CORP UNIFORM CLEANING SVC 31.54
91112 UNIFIRST CORP UNIFORM CLEANING SVC 58.66
91112 UNIFIRST CORP UNIFORM CLEANING SVC 60.32
91112 UNIFIRST CORP UNIFORM CLEANING SVC 79.77
91112 UNIFIRST CORP UNIFORM CLEANING SVC 139.19
91112 UNIFIRST CORP UNIFORM CLEANING SVC 53.71
91112 UNIFIRST CORP UNIFORM CLEANING SVC 58.66
91112 UNIFIRST CORP UNIFORM CLEANING SVC 39.56
91112 UNIFIRST CORP UNIFORM CLEANING SVC 150.27
91112 UNIFIRST CORP UNIFORM CLEANING SVC 32.94
91112 UNIFIRST CORP PD JAIL BLANKET CLEANING 142.30
91112 UNIFIRST CORP UNIFORM CLEANING SVC 75.50
91112 UNIFIRST CORP UNIFORM CLEANING SVC 31.54
91112 UNIFIRST CORP UNIFORM CLEANING SVC 60.32
91112 UNIFIRST CORP UNIFORM CLEANING SVC 37.76
91112 UNIFIRST CORP UNIFORM CLEANING SVC 46.08
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
91112 UNIFIRST CORP UNIFORM CLEANING SVC 48.45
91112 UNIFIRST CORP PD JAIL BLANKET CLEANING 142.30
91112 UNIFIRST CORP UNIFORM CLEANING SVC 58.66
91112 UNIFIRST CORP UNIFORM CLEANING SVC 32.94
91112 UNIFIRST CORP UNIFORM CLEANING SVC 27.40
91112 UNIFIRST CORP UNIFORM CLEANING SVC 31.02
91112 UNIFIRST CORP UNIFORM CLEANING SVC 19.05
91112 UNIFIRST CORP UNIFORM CLEANING SVC 53.71
91112 UNIFIRST CORP UNIFORM CLEANING SVC 17.24
91112 UNIFIRST CORP UNIFORM CLEANING SVC 14.71
91112 UNIFIRST CORP UNIFORM CLEANING SVC 29.58
91112 UNIFIRST CORP UNIFORM CLEANING SVC 141.90
91112 UNIFIRST CORP UNIFORM CLEANING SVC 16.52
91112 UNIFIRST CORP UNIFORM CLEANING SVC 39.70
91112 UNIFIRST CORP UNIFORM CLEANING SVC 40.76
91112 UNIFIRST CORP UNIFORM CLEANING SVC 45.13
91112 UNIFIRST CORP UNIFORM CLEANING SVC 60.80
91112 UNIFIRST CORP UNIFORM CLEANING SVC 37.76
91112 UNIFIRST CORP UNIFORM CLEANING SVC 31.54
85686 UNIQUE MANAGEMENT SERVICES INC Library - Message Bee 594.15 99471 UNIVERSAL WASTE SYSTEMS INC PORTABLE TOILET RENTAL 102.99 99471 UNIVERSAL WASTE SYSTEMS INC PORTABLE TOILET RENTAL 105.17 99858 VISION SERVICE PLAN VISION PLAN- NOVEMBER 202 5,182.82 92665 VOHNE LICHE KENNELS INC PD K9 TRAINING 200.00
82348 WASHINGTON STATE SUPPORT REGIS WAGE ASSIGNMENT: PAYMENT 713.53 89778 WATERLINE TECHNOLOGIES INC Sodium Hypochlorite Deliv 737.87 89778 WATERLINE TECHNOLOGIES INC Sodium Hypochlorite Deliv 513.30 89778 WATERLINE TECHNOLOGIES INC Sodium Hypochlorite Deliv 769.95 97322 WEBB'S K-9 TRAINING PD K9 TRAINING SERVICES 500.00 97351 WESTERN AUDIO VISUAL AUDIO, VIDEO, LIGHTING, V 17,212.98 97351 WESTERN AUDIO VISUAL AUDIO, VIDEO, LIGHTING, V 18,518.81 97351 WESTERN AUDIO VISUAL COUNCIL CHAMBERS AUDIO, V 28,796.02 99851 WEX HEALTH INC JAN 2025 ADMIN FEES 838.45
98165 WILLDAN ENGINEERING CIP 5732 PD ADMIN FACILIT 3,192.00 98165 WILLDAN ENGINEERING CIP 5732 PD ADMIN FACILIT 1,344.00 75597 WILLDAN FINANCIAL SERVICES WILLDAN PLAN CHK SERVICES 40,589.40 97861 YUNEX LLC EXTRAORDINARY WORK/POLE 3,630.83
8.A.
City of Hemet
DETAIL INVOICE LIST
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CASH ACCOUNT: 999 18778 CHECK RUN: 021926 02/19/2026
VENDOR VENDOR NAME PURPOSE AMOUNT
97861 YUNEX LLC FLORIDA & HAMILTON POLE W 2,330.00
97861 YUNEX LLC FLORIDA & GILMORE POLE 7,920.00
97861 YUNEX LLC 1120 FLORIDA POLE 5,190.00
90322 ZEP SALES & SERVICE PW PARK SUPPLIES 102.99
90322 ZEP SALES & SERVICE PW PARK SUPPLIES 850.28
92326 ZOLL MEDICAL CORP CPR CONNECTOR 193.09
92326 ZOLL MEDICAL CORP MEDICAL SUPPLIES 579.26
358 INVOICES CHECK RUN TOTAL 1,247,869.90
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021926 02/19/2026
ACCOUNT ORG DESC ACCT DESC
110.00.1150.65300. GENERAL OTHER IMPR 85,327.81
110.01.1000.52400. GENERAL CONTRACTS 337.32
110.01.1401.52710. GENERAL PROFESSION 30.60
110.01.1801.52400. GENERAL CONTRACTS 366.28
110.01.1801.52710. GENERAL PROFESSION 333.90
110.02.1000.52250. GENERAL OFFICE SUP 487.19
110.04.1000.52710. GENERAL PROFESSION 9.90
110.05.1000.52710. GENERAL PROFESSION 5,049.28
110.06.1000.52710. GENERAL PROFESSION 9.90
110.07.1000.52250. GENERAL OFFICE SUP 2,563.73
110.07.1000.52400. GENERAL CONTRACTS 5,178.57
110.07.1000.52700. GENERAL UNIFORMS A 436.98
110.07.3300.52610. GENERAL CONTRACT I 40,589.40
110.07.3225.52400. GENERAL CONTRACTS 18,777.50
110.07.3350.52714. GENERAL PRINTING S 419.61
110.07.3243.52450. GENERAL MAINT & OP 344.90
110.07.3241.52450. GENERAL MAINT & OP 6,435.59
110.07.3241.52710. GENERAL PROFESSION 1,655.80
110.07.5000.52265.2404B GENERAL SOFTWARE M 1,600.00
110.08.1000.52710. GENERAL PROFESSION 2,030.00
110.09.1000.52550. GENERAL CONFERENCE 372.00
110.09.1000.52560. GENERAL TRAINING & 901.92
110.09.1000.52700. GENERAL UNIFORMS A 851.10
110.09.3002.52560. GENERAL TRAINING & 129.00
110.09.3002.52710. GENERAL PROFESSION 590.00
110.09.3003.52250. GENERAL OFFICE SUP 31.75
110.09.3003.52560. GENERAL TRAINING & 265.86
110.09.3003.52700. GENERAL UNIFORMS A 632.00
110.09.3005.52700. GENERAL UNIFORMS A 1,589.90
110.09.3008.52560. GENERAL TRAINING & 307.14
110.09.3010.55410. GENERAL PACT PROGR 208.69
110.09.3013.52200. GENERAL TELEPHONE/ 418.05
110.09.3013.52400. GENERAL CONTRACTS 1,799.65
110.10.4250.52200. GENERAL TELEPHONE/ 65.00
110.10.4250.52400. GENERAL CONTRACTS 857.72
110.10.4250.52450. GENERAL MAINT & OP 3,203.65
110.10.4250.52700. GENERAL UNIFORMS A 159.28
110.10.4100.52400. GENERAL CONTRACTS 87.98
110.10.4100.52610. GENERAL CONTRACT I 8,961.10
110.10.4100.52710. GENERAL PROFESSION 4,035.00
110.10.5000.65500.2407E GENERAL RIGHTS OF 67.50
FUND TOTAL 197,518.55
115.09.5000.52710.2523P MEASUREU PROFESSION 3,200.00
115.09.5000.65500.5732P MEASUREU RIGHTS OF 4,536.00
FUND TOTAL 7,736.00
130.09.3005.52250. PUBSAFTOW OFFICE SUP 272.14
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021926 02/19/2026
ACCOUNT ORG DESC ACCT DESC
130.09.3005.52560. PUBSAFTOW TRAINING & 774.00
FUND TOTAL 1,046.14
221.10.4200.52105. GASTAX UTILITIES 897.18
221.10.4200.52400. GASTAX CONTRACTS 6,660.18
221.10.4200.52450. GASTAX MAINT & OP 2,277.94
221.10.4200.52700. GASTAX UNIFORMS A 155.27
FUND TOTAL 9,990.57
222.10.5000.52710.2410E MEASUREA PROFESSION 13,732.50
222.10.5000.52710.2514E MEASUREA PROFESSION 7,000.00
222.10.5000.52710.5696E MEASUREA PROFESSION 557.60
FUND TOTAL 21,290.10
225.11.8250.52105. LLMD UTILITIES 435.84
225.11.8250.52400. LLMD CONTRACTS 10,079.17
225.11.8250.52450. LLMD MAINT & OP 20,413.48
225.11.8250.52700. LLMD UNIFORMS A 60.46
225.11.8250.52710. LLMD PROFESSION 286.70
FUND TOTAL 31,275.65
227.11.8250.52710. LIGHTING PROFESSION 286.75
FUND TOTAL 286.75
228.11.8265.52400. LANDSCAPE CONTRACTS 208.16
228.11.8265.52450. LANDSCAPE MAINT & OP 1,558.88
228.11.8265.52700. LANDSCAPE UNIFORMS A 94.62
228.11.8250.52700. LANDSCAPE UNIFORMS A 60.52
228.11.8266.52400. LANDSCAPE CONTRACTS 2,083.46
228.11.8266.52450. LANDSCAPE MAINT & OP 2,700.00
228.11.8269.52400. LANDSCAPE CONTRACTS 307.54
228.11.8264.52400. LANDSCAPE CONTRACTS 776.07
228.11.8268.52400. LANDSCAPE CONTRACTS 131.10
228.11.8267.52400. LANDSCAPE CONTRACTS 60.13
228.11.8270.52400. LANDSCAPE CONTRACTS 359.07
228.11.8271.52400. LANDSCAPE CONTRACTS 976.24
228.11.8272.52400. LANDSCAPE CONTRACTS 5,591.58
228.11.8273.52400. LANDSCAPE CONTRACTS 348.47
228.11.8276.52400. LANDSCAPE CONTRACTS 6,390.87
228.11.8277.52400. LANDSCAPE CONTRACTS 163.72
228.11.8278.52400. LANDSCAPE CONTRACTS 195.12
228.11.8279.52400. LANDSCAPE CONTRACTS 870.59
228.11.8280.52400. LANDSCAPE CONTRACTS 1,742.03
228.11.8283.52400. LANDSCAPE CONTRACTS 76.60
228.11.8285.52400. LANDSCAPE CONTRACTS 35.17
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021926 02/19/2026
ACCOUNT ORG DESC ACCT DESC
228.11.8287.52400. LANDSCAPE CONTRACTS 101.59
228.11.8288.52400. LANDSCAPE CONTRACTS 3,354.33
228.11.8289.52400. LANDSCAPE CONTRACTS 350.77
228.11.8290.52400. LANDSCAPE CONTRACTS 327.68
228.11.8292.52400. LANDSCAPE CONTRACTS 3,206.79
228.11.8299.52400. LANDSCAPE CONTRACTS 44.48
228.11.8301.52400. LANDSCAPE CONTRACTS 794.43
228.11.8303.52400. LANDSCAPE CONTRACTS 6.93
228.11.8262.52400. LANDSCAPE CONTRACTS 504.10
228.11.8312.52400. LANDSCAPE CONTRACTS 305.01
FUND TOTAL 33,726.05
229.11.8313.52710. PWCFD PROFESSION 51.50
229.11.8314.52400. PWCFD CONTRACTS 998.72
229.11.8314.52710. PWCFD PROFESSION 206.00
229.11.8316.52400. PWCFD CONTRACTS 1,612.48
229.11.8316.52710. PWCFD PROFESSION 154.50
229.11.8323.52400. ASSESSMENT CONTRACTS 257.50
FUND TOTAL 3,280.70
232.09.2000.52560.00080 PSGRANT TRAINING & 588.00
FUND TOTAL 588.00
234.07.3241.52710. PSCFD PROFESSION 92.70
234.09.1000.52710. PSCFD PROFESSION 92.70
FUND TOTAL 185.40
254.10.4600.52254. SEWERSTORM OFFICE SUP 40.69
254.10.4600.52700. SEWERSTORM UNIFORMS A 113.28
254.10.4600.52710. SEWERSTORM PROFESSION 124.20
254.10.4650.52400. SEWERSTORM CONTRACTS 3,681.50
254.10.4650.52700. SEWERSTORM UNIFORMS A 92.16
254.10.4650.52710. SEWERSTORM PROFESSION 8.10
254.10.5000.52710.5754T SEWERSTORM PROFESSION 15,042.50 254.10.5000.65500.2416E SEWERSTORM RIGHTS OF 44,221.00
254.10.5000.65500.2518E SEWERSTORM RIGHTS OF 37,950.00
254.10.5000.65500.5767T SEWERSTORM RIGHTS OF 40,013.70
FUND TOTAL 141,287.13
266.08.5000.65400.2405E MISCGRANT MAJOR MACH 336,685.72 266.10.5000.52710.2402E MISCGRANT PROFESSION 40,518.77
FUND TOTAL 377,204.49
270.01.5000.65400.5738I ARPA MAJOR MACH 34,405.36
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021926 02/19/2026
ACCOUNT ORG DESC ACCT DESC
FUND TOTAL 34,405.36
316.01.5000.52260.5672A GENFAC SOFTWARE P 8,500.00
FUND TOTAL 8,500.00
326.10.5000.52710.2408E FLOODCONT PROFESSION 32,132.10
326.10.5000.52710.5592E FLOODCONT PROFESSION 8,174.65
FUND TOTAL 40,306.75
329.10.5000.52710.2413E BRSTTRFAC PROFESSION 780.00
329.10.5000.52710.5706E BRSTTRFAC PROFESSION 5,105.00
FUND TOTAL 5,885.00
363.08.1000.52710. LIBRARY PROFESSION 594.15
363.08.5000.65400.2405E LIBRARYFAC MAJOR MACH 112,228.58 363.08.6300.52230. LIBRARYFAC BOOKS & MA 683.00
FUND TOTAL 113,505.73
396.00.8100.52710. RDARETOBL PROFESSION 825.00
FUND TOTAL 825.00
496.00.8005.54300. REDEVELOP FISCAL AGE 2,862.00
FUND TOTAL 2,862.00
571.01.5000.52260.5672A WATER SOFTWARE P 2,700.00
571.10.5000.52710.5753W WATER PROFESSION 77.21
571.10.5000.65500.5659W WATER RIGHTS OF 953.90
571.10.9000.52254. WATER OFFICE SUP 40.68
571.10.9000.52450. WATER MAINT & OP 7,918.58
571.10.9000.52700. WATER UNIFORMS A 431.36
571.10.9000.52710. WATER PROFESSION 362.60
571.10.9000.52720. WATER WATER TEST 720.22
571.10.9000.52850. WATER SMALL TOOL 4,235.82
FUND TOTAL 17,440.37
680.01.1934.52200. IT TELEPHONE/ 793.19
680.01.1935.52200. IT TELEPHONE/ 4,634.66
680.01.1935.65400. IT MAJOR MACH 9,347.99
FUND TOTAL 14,775.84
681.00.2350.52710. WORKCOMP PROFESSION 2,700.00
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021926 02/19/2026
ACCOUNT ORG DESC ACCT DESC
FUND TOTAL 2,700.00
682.00.2150.52500. DENTVISINS INSURANCE, 5,182.82
682.00.2150.52710. DENTVISINS PROFESSION 200.20
FUND TOTAL 5,383.02
683.00.2200.52560. LIABILITY TRAINING & 526.00
FUND TOTAL 526.00
684.10.4550.52350. FLEETMAINT VEHICLE SU 17,442.75
684.10.4550.52700. FLEETMAINT UNIFORMS A 439.70
684.00.0000.11291. FLEETMAINT UNLEADED I 31,510.99
684.00.0000.11296. FLEETMAINT DIESEL INV 8,293.65
FUND TOTAL 57,687.09
685.10.4560.52400. FACMAINT CONTRACTS 15,802.68
685.10.4560.52450. FACMAINT MAINT & OP 4,421.94
685.10.4560.52460. FACMAINT BUILDING M 29,772.97
685.10.4560.52700. FACMAINT UNIFORMS A 188.18
FUND TOTAL 50,185.77
686.10.1000.52400. PWADMIN CONTRACTS 818.00
FUND TOTAL 818.00
689.00.2150.52710. OPEB PROFESSION 488.25
FUND TOTAL 488.25
750.00.0000.22141. PAYROLLDEP DIS INS PA 16,741.61
750.00.0000.22160. PAYROLLDEP EMP DUES: 16,647.58
750.00.0000.22163. PAYROLLDEP EMP DUES: 3,217.78
750.00.0000.22165. PAYROLLDEP EMP DUES: 10,240.00
750.00.0000.22166. PAYROLLDEP EMP DUES: 1,200.00
750.00.0000.22167. PAYROLLDEP EMP DUES: 2,340.00
750.00.0000.22169. PAYROLLDEP EMP DUES: 884.00
750.00.0000.22173. PAYROLLDEP OTHER PAYA 3,360.00
750.00.0000.22174. PAYROLLDEP OTHER PAYA 1,613.53
750.00.0000.22185. PAYROLLDEP SECTION 12 150.00
750.00.0000.22187. PAYROLLDEP SECTION 12 5,615.67
750.00.0000.22188. PAYROLLDEP SECTION 12 3,161.22
FUND TOTAL 65,171.39
788.00.8860.52710. HEARTLAND PROFESSION 988.80
8.A.
City of Hemet
CHECK RUN SUMMARY
Report generated: 02/19/2026 15:52
User: kfranzo
Program ID: apwarrnt
CHECK RUN: 021926 02/19/2026
ACCOUNT ORG DESC ACCT DESC
FUND TOTAL 988.80
CHECK RUN SUMMARY TOTAL 1,247,869.90
** END OF REPORT - Generated by KARA FRANZO **
8.A.
City of Hemet
City Council Meeting
STAFF REPORT
Meeting: City Council Meeting - Mar 10 2026
Department: Administration
Submitted by: Mark Prestwich, City Manager
Jane Halstead, Interim City Clerk;
☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:
Approval of the City Council Regular Meeting Minutes of February 10, 2026, the Special Meeting Minutes of February 18, 2026, and the Regular Meeting Minutes of February 24, 2026 RECOMMENDED ACTION:
It is respectfully recommended that the City Council:
Approve the City Council Regular Meeting Minutes of February 10, 2026, the Special Meeting Minutes of February 18, 2026, and the Regular Meeting Minutes of February 24, 2026.
STRATEGIC PLAN INTEGRATION:
GOAL THREE: COMMUNITY ENGAGEMENT
To connect and participate in a constant dialogue between members of the community, City staff, and elected officials to promote togetherness and positivity.
Objective 1: Deliver messaging to the Community that connects, is consistent, and relevant.
Objective 2: Increase transparency for the public.
ATTACHMENT(S):
City Council Meeting - Feb 10 2026 - Minutes
Special City Council Meeting - Feb 18 2026 - Minutes
City Council Meeting - Feb 24 2026 - Minutes
9.A.
MINUTES
City Council Meeting
City of Hemet
Hemet Public Library, Second Floor
Tuesday, February 10, 2026
1. WORK STUDY SESSION – 4:00 P.M.
2. CALL TO ORDER
The City Council of the City of Hemet met on this date in a Work Study Session at 4:00 P.M. in the City Council Chamber, 300 E. Latham Avenue, Hemet, California, with Mayor Krupa presiding.
3. ROLL CALL
Deputy City Clerk Klug provided the Roll Call as follows:
Present: Mayor Linda Krupa
Mayor Pro Tem Joe Males
Council Members Connie Howard-Clark, Tom Lodge, and Jackie Peterson
Absent:
Staff Present:
City Manager:
City Attorney:
Deputy City Clerk:
Mark Prestwich
Steven Graham
Elodie Klug
4. PUBLIC COMMENT PERIOD - RULES OF DECORUM, RESOLUTION NO. 4545 Mayor Krupa asked for Public Comment, and the following citizens spoke: None.
5. WORK STUDY DISCUSSION ITEM
5.A. Fiscal Year 24/25 Action Item #8 Update: Identify Locations, Sequencing, Land Acquisition Strategy, and Funding for Locations of Future Fire Stations Interim Chief Cameron Phillips introduced Chief Webb, who gave a PowerPoint presentation.
Action:
By consensus, the City Council received and filed the update of Fiscal Year 24/25 Action Item #8: Identify Locations, Sequencing, Land Acquisition Strategy, and Funding for Locations of
9.A.
City Council Meeting
February 10, 2026
Future Fire Stations; Consider providing direction to the City Manager to analyze and present funding alternatives and recommendations at a future meeting.
6. ADJOURNMENT OF WORK STUDY SESSION
7. CLOSED SESSION – 5:00 P.M.
8. CALL TO ORDER
The City Council of the City of Hemet met this date in a Closed Session at 5:08 p.m. in the City Council Chamber, 450 E. Latham Avenue, Hemet, California, with Mayor Krupa presiding.
9. ROLL CALL
Deputy City Clerk Klug provided the Roll Call as follows:
Present: Mayor Linda Krupa
Mayor Pro Tem Joe Males
Council Members Connie Howard-Clark, Tom Lodge, and
Jackie Peterson
Absent:
Staff Present:
City Manager:
City Attorney:
Deputy City Clerk:
Mark Prestwich
Steven Graham
Elodie Klug
10. PUBLIC COMMENT PERIOD - RULES OF DECORUM, RESOLUTION NO. 4545 Mayor Males asked for Public Comments; no one spoke.
Council recessed into Closed Session at 5:09 p.m.
11. DISCUSSION ITEM
11.A. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Significant Exposure to Litigation Pursuant to Paragraph (2) of Subdivision (d) of Section 54956.9
Number of Cases (1)
12. ADJOURNMENT OF CLOSED SESSION
Closed Session was adjourned at 5:45 p.m.
13. REGULAR MEETING – 6:00 P.M.
14. CALL TO ORDER
The City Council of the City of Hemet met this date in a Regular Session at 6:01 p.m. in the City Council Chamber, 300 E. Latham Avenue, Hemet, California, with Mayor Krupa presiding.