RESOLUTION NO. 18-058
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERCULES APPROVING CONDITIONAL USE PERMIT #CUP 18-01 AND DESIGN REVIEW PERMIT #DRP 18-02 FOR THE WILLOW AVENUE COMMERCIAL PROJECT LOCATED ON APN#'S 406-522-001 AND 406-522-004
Conditional use Permi CU ho and Design Revie Peni SuP 182 to lice in o develop a mini-storage (aka self storage) facility along with an auto repair use, car wash (Automatic - attached or unattached), oil change, and tire store contained within eight new buildings (5 associated with the self storage and 3 related to auto service uses) and associated site work and landscaping on a 7.1 acre site located at the southeast corner of Willow and Palm Avenues; and
WHEREAS, in addition to the CUP/DRP applications reference above the following entitlement applications related to the Project were filed and concurrently and collectively define the "Project"
• Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS/MND/MMRP) for the Willow Avenue Commercial Project prepared pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines; • Zoning Text Amendment #ZTA 18-04 to add "Mini-Storage" within the General Commercial (CG) zone with a Conditional Use Permit and add Mini Storage Facility to the definitions sections of the Hercules Zoning Ordinance; • Development Agreement #DA 18-01 with Hercules Self Storage, LP; and WHEREAS, an Initial Study (IS) was prepared which determined that CEQA required that a Mitigated Negative Declaration (MND) be prepared for the project. The MND was subsequently completed, and properly published for a 20 day public review from June 22, 2018 to July 12, 2018; and
WHEREAS, the Planning Commission held an initial public hearing to consider the proposed project on July 16, 2018, and after considering input from City staff, the Applicant, and the public, the Planning Commission provided direction to the Applicant on design and other aspects of the Project, and continued consideration of the Project and the public hearing to the August 6, 2018 Planning Commission meeting; and
WHEREAS, comments received on the MND were subsequently responded to in the Final MND, which was considered by the Planning Commission at their continued public hearing on August 6, 2018 where the Commission approved Resolution #18-14 recommending that the City Council approve the IS/MND and corresponding Mitigation Monitoring and Reporting Program (MMRP) based on the facts and findings contained therein; and Resolution No. 18-058
WHEREAS, at the August 6, 2018 Planning Commission meeting the Commission approved Resolution #18-15 recommending City Council approve Zone Text Amendment #ZTA 18-04 based on the facts and findings contained therein; and
WHEREAS, at the August 6, 2018 Planning Commission meeting, the Commission approved Resolution #18-16 determining that Development Agreement #DA 18-01 meet the various required findings and recommended that the City Council pass an Ordinance approving #DA 18- 01; and
WHEREAS, at the August 6, 2018 Planning Commission meeting, the Commission reviewed the revised drawings for Conditional Use Permit #CUP 18-01 and Design Review Permit #DRP 18-02 and approved Resolution #18-17 recommending that the City Council approve a resolution approving #CUP 18-01 and #DRP 18-02 applications subject to the conditions of approval as modified by the Planning Commission at their August 6, 2018 meeting in conformity with the August 6, 2018 presentation booklet; and
WHEREAS, at the September 11, 2018 City Council, the Council held a duly noticed public hearing to review all the above listed application and the revised drawings and all pertinent information about the project; and
WHEREAS, the City Council has received oral and written comments from the general public, property owners, and interested parties, and has thoroughly considered all above referenced reports, recommendations, and testimony, and used its independent judgment before making a decision or taking any action on the Project.
NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY
OF HERCULES FINDS THAT THE FORGOING RECITALS ARE TRUE AND
CORRECT AND MADE A PART OF THIS RESOLUTION BY THIS REFERENCE AND THAT:
After due study, deliberation, and public hearings, the City Council makes specific findings and determinations below which are supported by facts and findings stated in the City Council staff report, prepared for the City Council regular meeting of September 11, 2018, and that the City Council Finds that Conditional Use Permit related provisions are being met in that:
(a) That the proposed use is consistent with the General Plan. (b) That the proposed location of the use conforms with the purposes of the zoning ordinance and the purposes of the district in which the site is located, and will comply with the applicable pro That the location, size, design and operating characteristics of the proposed use will be compatible in design, scale, coverage and density with existing and anticipated adjacent uses.
(c) That the location, size, design and operating characteristics of the proposed use will be compatible in design, scale, coverage and density with existing and anticipated adjacent uses.
(d) There is adequate access, traffic, public utility, and public service capacity for the proposed use and surrounding existing and anticipated uses.
Resolution No. 18-058
(e) There are no potential, significant adverse environmental impacts that could not be feasibly mitigated and monitored.
And that Design Review Permit related provisions are being met in that:
(a) The approval of the design review plan is in compliance with all provisions of this Chapter, pertinent provisions of Zoning Ordinance and applicable zoning and land use regulations, including but not limited to the Hercules General Plan as amended and any specific plan.
(b) The approval of the design review plan is in the best interests of the public health, safety, and general welfare.
(c) General site considerations, including site layout, open space and topography, orientation and location of buildings, vehicular access, circulation and parking, setbacks, height, walls, tences, public satety and similar elements have been designed to provide a desirable environment for the development.
(d) General architectural considerations, including the character, scale, and quality of the design, the architectural relationship with the site and other buildings, building materials colors, screening of exterior appurtenances, exterior lighting and signing, and similar elements have been incorporated in order to insure the compatibility of this development with its design concept and the character of adjacent buildings. (e) General landscape considerations, including the location, type, size, color, texture and coverage of plant materials at the time of planting and after a 5 year growth period, provision for irrigation, maintenance and protection of landscaped areas and similar elements have been considered to insure visual relief, to complement buildings and structures, and to provide an attractive environment for the enjoyment of the public.
BE IT FURTHER RESOLVED THAT THE CITY COUNCIL ALSO FINDS AS FOLLOWS:
The proposal will not be detrimental to the health, safety, welfare, and public interest of the City so long as the applicant adheres to the below Conditions of Approval, Mitigation Monitoring and Reporting Program and drawings contained herein as Exhibits A and B.
The proposal is internally consistent and does not conflict with the purposes, regulations, and required findings of the Zoning Ordinance so long as the applicant adheres to all the Conditions of Approval.
The City Council, and the applicant agrees with the necessity of, all elements, requirements, and below conditions for the Willow Avenue Commercial Project are a reasonable and appropriate manner of preserving, protecting, providing for, and fostering the health, safety, and welfare of the citizenry in general and the persons who work or visit this development based on the Design Review and Use Permit related Facts and Findings as documented in the City Council staff report, and attachments to the staff report, prepared for the September 11, 2018 City Council meeting.
General underground utility considerations, including the location, type, and size are not included Resolution No. 18-058
in this approval. Review of exact locations, type, and size will be performed by Engineering as part of the final project design.
BE IT FURTHER RESOLVED THAT THE CITY COUNCIL HEREBY APPROVES THE CONDITIONAL USE PERMIT #CUP 18-01) AND DESIGN REVIEW PERMIT #DRP 18-02- FOR THE WILLOW AVENUE COMMERCIAL PROJECT, SUBJECT TO
THE FOLLOWING CONDITIONS OF APPROVAL CONTINGENT UPON THE PASSAGE OF CITY COUNCIL RESOLUTION 2018-057 AND ORDINANCE NOS. 513 AND 513:
Legend:
PW=Public Works primarily responsible for implementing
PL= Planning primarily responsible for implementing
BD= Building primarily responsible for implementing
CA= City Attorney primarily responsible for implementing FD= Fire Department primarily responsible for implementing MND=Mitigation from Mitigated Negative Declaration
PROJECT SPECIFIC CONDITIONS
Transportation/Road Improvements: Applicant/Developer shall implement the following transportation related improvements prior to project occupancy, including any needed frontage improvements to Willow Avenue and Palm Avenue as required by the City Engineer:
a. Applicant/Developer shall restripe and widen Willow Avenue on the southside of the street adjacent to the project site to provide a second westbound lane on Willow approaching Palm (within 200 feet including the transition from one to two westbound lanes) to provide separate left-turn and through lanes in westbound direction, as well as improvements to the Willow/Palm Intersection to ensure all lanes of travel line up correctly, to the satisfaction of the City Engineer. These improvements to Willow Avenue and the Willow/Palm Intersection will be eligible for fee credit under the City's Transportation Impact Fee, to the extent as determined by the City Engineer, or as otherwise negotiated. (PW) (MND).
b. Applicant/Developer shall improve the right turn on Palm Avenue onto Willow Avenue to accommodate fire truck design vehicle including curb and gutter to the satisfaction of the City Engineer. These improvements to the Willow/Palm Intersection will be eligible for fee credit under the City's Transportation Impact Fee, to the extent as determined by the City Engineer. (PW).
c. Prior to the issuance of construction permits, the applicant shall ensure there is adequate room for future Class II bike lanes in the ultimate widened configuration of Willow Avenue bordering the project site. (PW) (MND).
d. Applicant/Developer shall make an offer of dedication to the City for the right of way necessary to accommodate the possible future widening of Willow Avenue to accommodate two motor vehicle lanes per direction. The boundaries of the area involved in this offer of dedication shall be determined by the City Engineer e. Applicant/Developer shall enter into an encroachment agreement or similar instrument Resolution No. 18-058
for the private improvements constructed in the City's right-of-way. f. Applicant/Developer shall repair any damaged sidewalk, curb and gutter, and construct and dedicate any improvements within the City's right of way, including concrete curb, gutter, sidewalk, and paving, drainage system, street lights,, and fire hydrants all to the satisfaction of the City Engineer. (PW)
g. All street striping improvements shall be completed using raised pavement markers or thermoplastic. (PW)
h. Applicant/Developer shall provide engineering drawings for review by City staff confirming the provision of adequate stopping sight distance at the project driveway, and adequate sight-distance for permissive left-turns relevant to the westbound left-turn into the project site. Following project completion, the Applicant/Developer shall ensure that adequate maintenance is provided such that vegetation growth will not impeded the necessary sight distance. (PW)
2) Sanitary Sewer System: Applicant/Developer shall design and construct a sanitary sewer disposal system to the satisfaction of the City Engineer. The system shall comply with City and/or Contra Costa County Department of Environmental Health standards.
Applicant/Developer shall secure necessary approvals and easements from private property owners and/or government agencies as required to construct and maintain the system.
Applicant/Developer shall demonstrate the viability of the system to the satisfaction of the City Engineer prior to the issuance of any construction permits for the Project. (PW) 3) Future Design Review Approval Required: Future Design Review approval by the Planning Commission is required for the car wash (Automatic - attached or unattached), express lube, and auto services buildings, as such approval is not being granted as part of this application. The design and architecture of these three buildings shall be generally consistent with the conceptual design for these buildings as depicted in the drawings submitted for the August 6, 2018 Planning Commission meeting. Future Design Review applications for the car wash (Automatic - attached or unattached), express lube, and auto services buildings may be submitted individually for each building or simultaneously for more than one building (PL). 4) Sign Program for Auto Services Buildings: Concurrently with submitting the first Design Review application for a building in the automotive commercial portion of the project, the property owner must submit a complete application to the City for a sign program that addresses signage for the automotive center and for all three auto related buildings. (PL) 5) Project Phasing: If the project is phased, in the Applicant's/Developer's sole discretion, development of the property shall be phased in such a manner so that each phase of the project is fully functional and self contained, and meets all City requirements in relation to access, parking, utilities, grading, landscaping, and related provisions requirements, as determined by the Planning and Public Works Director (PL/PW).
6) Access/Parking Easements: Cross access, parking, maintenance, and utility easements shall be provided between the two existing tax parcels that comprise the project site to ensure that both parcels have adequate access, parking, and utilities, and are properly maintained. The documents/maps stipulating the terms and locations of these easements shall be subject to the Resolution No. 18-058
review and approval of the Public Works Director. The legal documentation necessary to establish these easements shall be approved and operative prior to the first project occupancy (PW).
7) Grading Adjacent to Willow Avenue Sidewalk: The bottom ("toe") of all slopes being graded along the project's Willow Avenue frontage shall be set back a minimum of three (3) feet from the back of the existing public sidewalk on Willow Avenue. All such slopes adjacent to the Willow Avenue sidewalk shall not exceed a grade of 2 to 1. These slopes adjacent to the Willow Avenue sidewalk shall be landscaped and stabilized in such a manner so as to prevent soil and landscape material from eroding/washing onto the public sidewalk, and to provide adequate protection for the buildings located at the top of the slope. (PW). 8) Encroachment Permit: Prior to any grading or construction within the public right of way, the Developer/Property Owner shall secure from the City an encroachment permit and grading permit, the terms of which shall be subject to the approval of the Public Works Director. This encroachment permit shall address the landscaping and maintenance requirements as specified in Condition #9 of this resolution. 9) Landscaping Within the Public Right of Way: The Public Right of Way located between the back of the Willow Avenue sidewalk and the project site shall be fully landscaped, irrigated, and maintained by the Applicant/Property Owner to a level consistent with the proposed Project landscaping. This landscaping and maintenance requirement shall also include the public right of way located between the project site and the edge of pavement at the Willow/Palm Avenue intersection. Applicant / owner is required to participate in a Lighting Landscape and Maintenance District (LLAD).
10) Landscaping of 1 to 1 slope adjacent to Wetlands: Prior to issuance of Grading Permits, the Applicant/Property Owner shall provide landscape and engineering plans and other documentation, including a soils report specific to this area, addressing how this steep slope will be stabilized, landscaped, and maintained.
11) Status of Existing Easement: Prior to issuance of building permits the Applicant/Property owner shall provide the City with a Title Report and/or other documentation that addresses the current status of the easement that runs in an east west direction through the site in close proximity to the site's southern property line and resolve any potential conflicts to the satisfaction of the City Engineer and the City Attorney. 12) Outdoor Storage: No temporary or permanent outdoor storage of equipment, merchandise, vehicles, or other related material is permitted on f the project site, with the exception of the rental vehicles associated with the self storage facility (PL). 13) Vehicle Rental: Vehicle rental associated with the self storage facility is allowed under this Use Permit. A maximum of 12 rental vehicles are permitted on the site at any one time.
Location shall be as depicted on page 24 of the plans submitted for the August 6, 2018 Planning Commission meeting. (PL).
Resolution No. 18-058
-
14) Hours of Operation: The self storage facility shall be open for business no earlier than 6:00am and shall close no later than 12:00 midnight. The auto related uses (car wash (Automatic - attached or unattached), express lube, and auto service center) shall open for business no earlier than 6:00am and close no later than 10:00pm (PL). 15) Retaining Walls Oriented Toward Public Streets: Retaining walls located parallel to the project's Willow Avenue frontage shall be of a decorative design with any single retaining wall on the Willow frontage limited to a maximum height of five (5) feet, subject to the review and approval of the Planning Director (PL).
16) Building Colors: The exterior colors used for the self storage buildings shall match the "Option A" project colors selected by the Planning Commission at its August 6, 2018 meeting that utilizes red as a highlight color. In addition, a single red color band shall be inset into all four elevations of Building "D", to be reflected in the City Council revised drawings (PL).
17) Approval Period: The approvals referred herein are each valid for the Term as set forth in
1.2 of the Development Agreement. (PL)
18) Mitigated Negative Declaration (MND): The Applicant/Developer shall comply with the Mitigation Measures as set forth in the Final Initial Study/Mitigated Negative Declaration / Mitigation Monitoring and Reporting Program for the project, including without limitation the improvements to the Willow and Palm Avenue intersection discussed above in condition #1 of this resolution.
STANDARD CONDITIONS
PLANNING RELATED STANDARD CONDITIONS (PL):
19) Compact and Accessible Parking: On-site compact parking spaces (i.e., parking spaces smaller than the standard 20'x9' parking space) shall be limited to no more than 40% of total required project parking. Parking configuration and striping will be subject to project approvals and applicable city codes. Accessible and compact parking spaces shall be appropriately identified on the pavement. The developer shall provide a minimum of 1-foot wide step-out curb or provide additional stall width for a paint-striped buffer equivalent on landscape fingers and islands adjacent to parking stalls. Median islands shall be designed to ensure adequate isle widths and turning radius per the approved plans. 20) Screening of Parking Spaces: Parking adjacent to public streets shall be substantially screened from view from the public street with landscaping, hardscape, and/or grade separation, including use of berms, as approved by the Planning Director. 21) Bicycle Parking: City zoning code requires a minimum of bicycle parking of 5% of the total parking. The specific type and location of bike parking shall be subject to the review and approval of the Planning Director, with the exact location and specific type of bicycle parking depicted on drawings included with the Building Permit submittal Resolution No. 18-058
22) Electric Vehicle Charging Stations: In accordance with California Building Code requirements, three (3) percent of the required parking spaces (or the appropriate percentage amended from time to time by the State) shall support vehicle charging stations, and the location of all proposed spaces shall be clearly identified on all plans subject to further review and approval by the Planning Director.
23) Parking Lot Striping/Signing Plan: A striping plan and any proposed directional and/or traffic control signage for the parking areas shall be submitted with the building construction plans to the Public Works Department for review and approval by the Public Works Director. 24) Project Fencing: The details and location of all proposed project fencing, including material samples if needed, shall be submitted for staff review and approval prior to the issuance of building permits. Any fencing visible from the public rights of way, including trails, shall be of a decorative material as determined by the Planning Director in general conformity with the fencing plan.
25) Screening of Above Ground Utilities: All above ground utilities visible from public rights of way shall be screened from view from the public right of way with landscaping, decorative materials, berming or other means as determined by the Planning Director. 26) Phase 1 Environmental Assessment Studies: Applicant/Developer shall supply the Director of Planning with a copy of the Applicant/Developer's Phase 1 environmental assessment studies. All remediation required by those studies shall be implemented to the satisfaction of the Director of Public Works prior to Improvement Plan approval. 27) Pedestrian Access: An accessible pedestrian route shall be provided between each primary building entrance and the public sidewalk, and between each primary building entrance and the disabled parking stalls designated to serve that building. The accessible route and all ramps shall comply with all current applicable ADA access requirements and City Standards. 28) Site Lighting: Prior to the issuance of a building permit, the Developer/Applicant shall obtain the approval of the City of a photometric lighting plan which demonstrates that all exterior areas of the site and project frontage will have a lighting level in accordance with California Code of Regulation and Title 24 (generally less than 0.01 foot-candle light spill at 15 feet beyond the property line). Lighting in landscaped areas throughout the project shall also be subject to reasonable review and approval by the City's Landscape Architect, Planning Department, and Public Works Department, in consideration of IES standards for lighting in public/community areas. The Applicant/Developer shall meet a performance standard of no increase in lighting spillover into adjacent "light-sensitive" areas (Central Hercules Plan) as reasonably approved by the Planning Director. At a minimum the plan shall include 0.50 foot-candle lighting at all doors, and lighting fixtures of exterior doors shall be of a vandal-resistant type.
29) Landscape Standards: A final landscape plan and irrigation plan with planting materials and planting plans shall be submitted to the Planning Director for review and approval Resolution No. 18-058
concurrent to or prior to the submittal of a building permit application, to be substantially consistent with the City's Water Efficient Landscape Regulations, and provisions of Section
30.700.2 of the City Zoning Ordinance. The Landscape Plan shall use native plants, drought- resistant, or low-maintenance species of plants, trees, and shrubs to reduce the demand for gas-powered landscape maintenance equipment and water. A tree replacement plan shall be incorporated as part of the landscape construction drawings showing the number, size, and type of trees being removed, if any are present. The final landscape plan shall indicate the type, location, and size of all plants, trees, shrubs, and groundcover materials being installed as part of the new Project. All trees shall be at least 15 gallon; all shrubs shall be at least 5 gallon, except that ornamental shrubs along pathways may be 1 gallon. Appropriate soil amendments shall be installed in all landscape areas to provide high survivability for the selected plantings as determined by the City. Landscaping and irrigation shall be incorporated with the site development permit plan set and installed per plans, as approved by the City, prior to issuance of a Certificate of Occupancy. 30) Minor Modifications: The project being built will substantially be in compliance, as determined by the Planning Director, with the latest submitted plans with any changes approved by the Planning Commission, unless otherwise amended by action of the City Council. Minor modifications to the project may be requested by the Applicant/Owner and approved administratively by the City as set forth in section 5.1 of the Development Agreement in conformity with Chapter 46 - Minor Modifications section of the Zoning Ordinance.
31) Special Zoning Provision of Section 35.280 of the Zoning Ordinance: The mini-storage facility shall follow all provisions of Section 35.280 - Mini-Storage Facilities section of the Hercules Zoning Code which includes some of the following standards:
a. The site shall be completely enclosed with a solid masonry wall 6 feet high with a gated entrance.
b. All structures shall be set back 25 feet from the street or highway right-of-way. c. One parking space per 10 storage units shall be provided or informal parking areas may be provided adjacent to the storage units as long as adequate circulation is maintained. All storage within the facility shall be within fully enclosed structures.
No toxic or hazardous materials shall be stored within the facility. The facility shall not be used to conduct business other than storage operations. d. No storage facility shall be used for human or animal habitation. No storage facility shall be used to cultivate, grow or keep live plants.
e. Each storage facility shall provide a trash receptacle or dumpster within the site for the use of its renters. The trash receptacle shall be of adequate size and capacity to accommodate the trash that is generated.
32) Performance Standards: The project plans and implementing construction shall also meet the City's Planning related Performance Standards listed in Chapters 30 and 31 of the Zoning Ordinance.
Resolution No. 18-058
BUILDING RELATED STANDARD CONDITIONS (BD):
33) Addressing Requirement: Prior to issuance of a building permit, the applicant shall obtain City and Fire District approval of a plan for addressing and identifying project buildings.
Such a plan shall include directional signs and markings, as may be required by the City or the Fire District.
34) Construction Drawings: Construction drawings submitted for review and approval also shall include: a) Site grading, drainage, utility, and improvement plans; and b) Hydrology and hydraulic calculations for the site. Applicant/Developer shall provide to the Engineering Division, prior to the issuance of building permits, a 100-foot scale site plan in both paper and digital form (to NAD 83 standards) of the project as approved by the City Council for the purposes of updating the City base maps.
a. An engineer's cost estimate for frontage and site improvements shall be submitted with the grading and building permit submittals.
b. Prior to construction, Applicant/Developer and City shall procure a performance bond reasonably acceptable to the City to establish the party or parties responsible for the construction of and financial responsibility for off-site improvements associated with the project site and to establish the timing of various construction activities. c. Applicant/Developer shall submit a grading plan prepared by a registered civil engineer incorporating into the grading plan all applicable recommendations from soil engineering and engineering geology reports. Site grading shall comply with City standards. The site shall be graded so that runoff is not increased or concentrated to adjacent properties and so as not to impede runoff from adjacent properties. The grading plan shall be reviewed and approved by Public Works prior to issuance of the grading and site development permit. Building pad elevation and landscaping mounds shall be shown on the grading plan.
d. All on site surface drainage shall be collected and conveyed in an adequately designed underground storm drainage system to an approved point of discharge in a manner approved by the City Engineer. Drainage design will be in conformance with the City standards.
e. Adequate sanitary facilities shall be provided and maintained during construction. f. Applicant/Developer shall make arrangements with the Planning/Public Works to inspect and test, prior to connection, any existing sewer and or East Bay Municipal Utilities District water service laterals to be used, and shall make necessary repairs as determined by the Inspector.
g. Curb cut widths and design shall substantially conform to the project approvals, City and Fire District standards.
h. On-site and off-site utility service shall be installed underground in accordance with the City Code. Utilities shall be undergrounded to the nearest suitable riser pole as determined by the appropriate utility company. Applicant/Developer shall post a bond or other surety approved by the City guaranteeing the undergrounding. 35) Health, Design and Safety Standards: Prior to final approval allowing occupancy of any new building, the physical condition of the building shall meet minimum health, design, and safety standards including but not limited to the following:
Resolution No. 18-058
a. The streets providing access to the site shall be complete to allow for safe traffic movements to and from the site.
b. All traffic striping and control signing on streets providing access to the site shall be in place.
c. Exterior lighting shall be provided for building entrances and shall be of a design and placement so as not to cause glare onto adjoining properties. d. All repairs to the street, curb, gutter, and sidewalk which may create a hazard shall be completed to the reasonable satisfaction of the Director of Public Works and any non- hazardous repairs shall be complete and/or bonded for.
e. The self storage facility leasing building and each of the car wash (Automatic - attached or unattached) , express lube, and auto services buildings shall have an illuminated address number that is clearly visible from the middle of the street. f. Lighting used after daylight hours shall be adequate to provide for security needs.
Photometrics and lighting plans for the site shall be submitted to the City for review and approval prior to the issuance of a building permit. g. All sewer clean-outs, water meter boxes, and other utility boxes shall be set to grade to the approval of the Director of Public Works.
36) Work Hours: All contractors (grading, building, landscaping etc.) shall observe City construction work hours (including all deliveries of materials and maintenance of equipment), unless prior arrangements are approved by the City. Hours of construction shall be from 7:00 a.m. to 5:00 p.m., Monday through Friday. No work shall be permitted weekends or holidays. Work hours for construction activities that occur completely within an enclosed structure are allowed to begin at 7:00 am and end at 8:00pm on weekdays, and from 8:00am to 5:00pm on weekends.
37) Construction Traffic Management Plan: Applicant/Developer shall develop and submit to the City a Construction Traffic Management Plan for review and approval by the Public ; Works Director prior to the initiation of any construction-related activities. 38) Refuse/Trash Collection and Construction Debris: A refuse collection plan shall be formulated, working with the refuse collection provider, Republic Services, to provide for efficient and effective trash/refuse collection system. The refuse collection plan shall be subject to Planning Director review and approval. Republic Services (a.k.a. Richmond Sanitary Service) is the exclusive franchised solid waste hauler for the City of Hercules.
Republic's exclusive collection rights include collection of all solid waste in the City, including construction and demolition (C&D) waste from construction and demolition projects in the City. Removal of construction and demolition (C&D) waste must be arranged with Republic Services prior to commencement of construction, or in another manner consistent with the Franchise Agreement or State Law. All construction material/equipment shall be staged outside the City's rights-of-way. The Developer/Applicant shall keep the adjoining public streets and properties free and clean of project dirt, mud, and materials during the construction period. Construction debris boxes shall be provided during all phases of construction. The Developer shall be responsible for corrective measures reasonably related to its construction activities at no expense to the City of Hercules.
Resolution No. 18-058
39) Temporary Construction Fencing: The use of any temporary construction fencing shall be subject to the review and reasonable approval of the Public Works Director, Hercules Police Services, and the Building Official. Security lighting and patrols shall be employed as necessary. The fencing shall not obstruct pedestrian access along the frontage during construction. A safe pedestrian access route shall be maintained along the frontage at all times where sidewalks exist.
40) Screening of Roof Mounted Equipment: All roof-mounted mechanical equipment, including but not limited to heating, ventilation, and air conditioning equipment, shall be recessed, grouped, and/or screened from adjoining property and public streets and highway subject to reasonable approval of the Planning Director. Plumbing vents, ducts, and other appurtenances protruding from the roof shall be integrated in such a manner that they will not be viewed from the front of the property or other highly visible vantage points. All vents, gutters, downspouts, flashings, conduits, etc. that are visible from outside the building shall be painted the color of the adjacent surface. A note shall be included on construction plumbing drawings of exterior elevations to indicate to contractors that roof features shall be grouped and located in the described manner. Roof vents shall be shown on construction drawings and painted to match roof material color. (PL/B) PUBLIC WORKS RELATED STANDARD CONDITIONS (PW):
41) Public Works Standards: Applicant/Developer shall comply with all applicable City of Hercules Public Works Standards. In the event of a conflict between the Public Works Standards and these Conditions, these Conditions shall prevail. In the event that clarifications to the conditions of approval are required, the Public Works Director or the Planning Director, as applicable, shall have the authority to clarify the intent of the conditions without requiring a public hearing.
42) Final Geotechnical Report: Applicant/Developer shall retain a licensed Geotechnical Engineer to prepare a Geotechnical Investigation Report for the site. The design of the underground utilities, grading, paving, retaining walls, and foundations shall be based on the recommendations outlined in said Report. The Geotechnical Engineer shall certify that the design conforms to the recommendations in the Report before the City issues a Grading/Site Development Permit. Applicant/Developer shall pave all parking lots in accordance with the Geotechnical Engineer's recommendations, based on the traffic index provided by the City's Traffic Engineer. Pavement sections shall be approved by the City Engineer or their designee in his or her reasonable discretion.
43) Soils Report: A Soils Report shall be submitted and the grading, retaining walls, surface and sub-surface drainage, lot drainage, and utility trench backfilling shall be designed in accordance with the recommendations of the registered geotechnical/soils engineer subject to approval by the City Engineer. Final grading and drainage plans for the site development permit shall be reviewed and signed by the Soils Engineer specifying the recommendations in the Soils Report have been followed. The geotechnical/soils engineer shall submit a letter report to the City at completion of construction certifying that grading, drainage and backfill Resolution No. 18-058
installation was performed in general compliance with recommendations in the geotechnical report. All material testing reports shall be attached to the certification letter report 44) Title Report Required: A current title report shall be submitted with any application for grading or building permits to verify current ownership and any existing easements or land use restrictions.
45) Street Repair: Should the developer cut into the newly constructed or rehabilitated City streets, the Developer shall restore such streets to their condition prior to developer's work and shall slurry seal and stripe (with thermoplastic) the adjacent streets in coordination witt the City Engineer and Public Works when the project is completed 46) Retaining Walls: Any retaining walls to be built along the property boundary to resolve differences in elevation between the property and the abutting right of way shall be constructed of aesthetically pleasing concrete, masonry block, or other City-approved durable material, as approved by the Planning Department. Structural calculations for any retaining walls shall be submitted to the County Building Department and depending on size may require separate building permit review and approval, as determined by the City Engineer.
Retaining Walls constructed of wood shall not be permitted. Maintenance of said walls shall be the responsibility of the Owner/Developer/Applicant. 47) Storm Drainage: Applicant/Developer shall be subject to project approvals and regulatory agency permitting requirements. The design of the storm drain system shall be consistent with the City standards, as evidenced by the preparation and submittal of hydrologic/hydraulic calculations prepared by a registered Civil Engineer. Drainage shall be designed in accordance with City standards and shall meet all requirements of the Regional Water Quality Control Board.
48) Location of Improvements/Configuration of Right of Way: All public streets, sidewalks, driveway approaches, street lights, traffic markings and signs, storm drainage facilities, handicap ramps, and other street improvements shall be located within the public right of way or public service easements and meet City Standards. The location of improvements shall be approved by the Director of Public Works in coordination with the Planning Department prior to construction.
49) Water and Sewer Lines: Applicant/Developer shall construct all fire hydrants, water lines, and sewer lines needed to serve the project, to the satisfaction of EBMUD and the Rodeo/Hercules Fire Protection District, City of Hercules, and Pinole-Hercules Treatment Plant.
50) Erosion Control Measures: An Erosion Control Plan shall be required if any work is to occur during the rainy season (1.e., between October 1 and April 15). If required, the erosion control plans shall be included in the Stormwater Pollution Prevention Plan (SWPPP) required for any grading permit or activity that may take place at the site. The Developer/Applicant shall install erosion control measures in all areas of the site during construction between October 1 and April 15 to the reasonable satisfaction of the Director of Resolution No. 18-058
Public Works. A plan for erosion control shall be prepared and submitted for approval by the Public Works Director. All erosion control measures shall be in accordance with the latest Regional Water Quality Control Board Manual of Sediment Control standards in effect at time of permit submittal. (PW)
51) Joint Utility Trenches/Undergrounding/Utility Plans: Applicant/Developer shall construct all utility trenches (such as electric, telephone, cable TV, and gas) in accordance with the applicable utility jurisdiction standards. All communication vaults, electric transformers, cable TV boxes, blow-off valves, and any appurtenant utility items thereto adjacent to any public right-of-way shall be undergrounded. Notwithstanding the foregoing, communication vaults, electric transformers, cable TV boxes, blow-off valves, and any appurtenant utility items thereto not adjacent to any public right-of-way are not required to be undergrounded.
Utility plans, showing locations of all proposed utilities (including electrical vaults and underground transformers) shall be reviewed and approved by the Director of Public Works in his or her reasonable discretion concurrent with the approval of the grading plans.
Location of these items shall also be shown on the Final Landscaping and Irrigation Plan and Site Plan for the Project construction and placed to reduce their visual impact. (PW) 52) Street Lighting: Applicant/Developer shall install required street lights within the City's right of way, to the satisfaction of the Public Works Director. 53) Sight Distance: Maintain landscaping along the entire project frontage to avoid sight distance conflicts (shrubs should not be higher than approximately 30 inches and tree canopies should be at least six feet above the ground) and stripe visual clear zones between the travel lane and bike lane as shown on the approved site plan. 54) Post-Construction Stormwater Management: Post-construction storm water quality controls shall be installed as part of this project. These controls will be reviewed and approved as part of the civil plan review process. A maintenance and inspection plan for the storm water treatment facilities shall be submitted with the plans and will be reviewed prior to permit approval. The developer shall enter into a Stormwater Operations and Maintenance Agreement with the City for the post-construction storm water quality control system. 55) Encroachment Permit: An Encroachment Permit shall be obtained for equipment driving over City property and over public easements. The developer shall arrange a pre- construction conference at least 48 hours prior to the proposed construction to discuss the scope and extent of removal and replacement of any pre-existing broken curb, gutter, sidewalk, or asphalt paving (patch, repair and/or overlay) in the public right-of-way. A cash deposit as reasonably determined by the City Engineer shall be required to secure the repair of any damages and said deposit may be increased at the discretion of the City Engineer, as reasonably necessary.
56) Utility Pipe Sizes: Utility pipe sizes to be shown and signed off by City Public Works Director as adequate before building permit issuance.
57) Documents Needed for City Base Maps: Developer shall provide to the Engineering Resolution No. 18-058
Division, prior to the issuance of building permits, a 100-foot scale site plan in both paper and digital form (to NAD 83 standards preferable/MicroStation SE) of the project as approved by the Planning Commission for the purposes of updating the City base map.
OTHER STANDARD CONDITIONS:
58) Indemnity Requirement: Failure by the Applicant/Grantee to object to any of the terms, conditions, requirements and obligations set forth in this Conditional Use Permit and Design Review Permit prior to the expiration of the appeal period (which is 10 business days of the mailing or posting of the approving resolution) shall constitute acceptance of all of the conditions and obligations imposed by the City on this permit. The Applicant/Grantee by said acceptance waives any challenges as to the validity of these conditions.
Applicant/Grantee agrees to indemnify and defend the City, its agents, officers and employees, at Applicant/Grantee's own expense, against and from any claim, action or proceeding brought by any third party arising from or relating to the City's processing of Applicant/Grantee's development applications, the City's issuance of any of the approvals described in these conditions, and the Applicant/Grantee's implementation of and operations under the Conditional Use Permit and Design Review Permit, including but not limited to any claim, action or proceeding brought to attack, set aside, void or annul any of the City approvals described in these conditions, and any claim, action or proceeding brought against the City arising from or relating to Applicant/Grantee's development and operation of the project that is the subject of such City approvals. City shall promptly notify Applicant/Grantee of any such claim, action or proceeding of which City receives notice, and City will fully cooperate with Applicant/Grantee in the defense thereof. Applicant/Grantee's obligations under this condition shall include the obligation to reimburse the City for any court costs, reasonable attorney's fees and damage awards which the City may be required to pay as a result of any such action. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, and such participation shall not relieve the Applicant/Grantee of any of the obligations of this condition. (CA). 59) Payment of Fees: Applicant/Developer shall pay plan check and processing fees, development fees, encroachment permit fees, and other miscellaneous fees applicable per current City resolutions in effect as of application for grading and/or building permits (BD). 60) Sewer Related Fees: Applicant/Developer is advised that City Ordinance requires payment of sewer connection fees prior to issuance of a building permit. Notwithstanding the above, it is hereby acknowledged Applicant/Developer and owners of the subject property are located within the Hercules-Pinole Wastewater Treatment Plant Assessment District. Accordingly, the actual sewer connection fee due shall be determined by the City Engineer consistent with the prior payments made to the sewer assessment district and in accordance any other conditions of approval (BD).
61) Business License Required: All contractors shall obtain a City of Hercules business license before starting work (BD).
Resolution No. 18-058
62) Graffiti Prevention and Control: The Applicant/Developer shall maintain the site free of graffiti. Graffiti applied to any surface of the subject property shall be removed within forty- eight (48) hours of the Applicant/Developer being notified by the City. The City may remove the graffiti if the Applicant/Developer fails to remove the graffiti within forty-eight (48); the Applicant/Developer shall reimburse the City for the graffiti-removal work (PL). 63) Compliance with all Conditions/Requirements: All conditions of approval for this development, including improvements such as building, paving, and landscape construction/installation, shall be completed prior to issuance of certificate of occupancy except as may be permitted by the Planning Director in consultation with other affected departments or as otherwise set forth herein. Completion of project improvements includes construction approved through building permits, construction of required off-site improvements approved through public works permits, and construction or installation of site improvements (including paving, hardscape, and landscaping) as shown on the approved plans. In the event early occupancy is permitted, Applicant/Developer shall provide to the reasonable satisfaction of the Planning Director and City Engineer and Building Official proof of substantial completion, safe occupancy, and security or agreements to assure full completion of the project PL,PW,BD).
64) Ongoing Site Maintenance: The property owner shall be responsible for ensuring the ongoing maintenance, servicing, and capital replacement of improvements on the project site.
This includes all parking lot and driveway striping and surfacing, sidewalks and hardscape, landscaping, open space, retaining walls, fences, streetlights, and related site improvements. 65) Handling of Hazardous Materials: All hazardous materials must be handled in conformance with applicable governmental safety requirements, and disposed of by a certified contractor using proper disposal procedures. The Applicant shall comply with the Contra Costa County Environmental Health Department's requirements, including, if required, the submittal of an Emergency Plan/Hazardous Materials Management Plan. 66) CC&Rs: Any covenants, conditions, and restrictions (CC&Rs) applicable to the subject property shall be consistent with the terms of this permit. Where a conflict exists between the CC&Rs and the City regulations, the City regulations shall prevail (CA). 67) Fire District:
a. Fire Department access roads shall be provided to within 150 feet path-of-travel distance of all portions of first floor exterior walls of all structures and hazardous materials use or storage areas. Access roads shall be designed to current Fire Department standards: 20 feet wide minimum for structures two-stories or less in height, and 26 feet wide minimum (with Aerial Apparatus Access compliance) for structures more than 30 feet in height. Access shall support the imposed load of fire apparatus weighing at least 74,000 Ibs. Turning radius 25 feet inside and 45 feet outside. Dead-end fire department access routes more than 150 feet in length shall have an apparatus tum-around per current Fire Department standards. CFC 503.
Apparatus Access issues:
Resolution No. 18-058
i. Projects in excess of 62,000 ft/2 require two separate fire department access roads and which are 'remote' from each other. Remote separated a distance apart of not less than one-half the maximum overall diagonal dimension of the property. This project exceeds the basic (62k f/t2) requirement and also the permitted exception (124k f/t2) and is not approvable with a single access.
CFC DI 07.2
ii. Buildings over 30' in height are required to satisfy the Aerial Apparatus Access Road requirements (26' wide on the longest side with proximity setback 15'- 30). Building D triggers this requirement. CFC D105.1
111. Site Plan. While turning radius evaluation is required around buildings, specific evaluation of the switchback tum maneuver between the divided entrance drive aisle and the Self-Storage drive aisle is necessary and also at the NE comer of Building D. CFC 503.2.4.
iv. A recorded access agreement establishing a right-of-way is necessary for the Self- Storage parcel as there is no connection from this parcel to Willow Avenue.
v. Building D. Please identify (stripe on asphalt) the prescribed "loading area" where customers will park their moving trucks while loading/unloading. Our interest is identifying where they will position and more importantly, that they are not parking in the minimum 20' fire lane which accessing the building. b. A Fire Flow Analysis including proposed building areas, type of construction, and calculated available fire flow at the proposed fire hydrants shall be provided to the Fire Department for review and approval concurrent with submittal of Grading plans.
Minimum adjusted (50% sprinkler credit) Fire Flow for this commercial project is estimated at 3,375 gallons per minute with 20 residual psi in the water main.
Applicant shall contact East Bay Municipal Utilities District to have a flow test performed for the nearest existing hydrant to be used for the hydraulic design prior to submitting the Fire Flow Analysis. CFC 507.
c. Hydrant spacing for this commercial project shall comply with current Fire District standards of CA Fire Code Chapter 9 and Appendix C and three (3) copies of the final site plan shall be submitted for approval of hydrant locations. d. Location of Fire Department Connections (FDCs) for the required automatic fire sprinkler systems are a deferred item but shall be on the access side of the buildings and within 50' of a fire hydrant. CFC Appendix C.
e. Private Underground Fire Mains (aka on-site mains behind the detector check) require a separate Fire Department permit. CFC 507.
f. The Rodeo-Hercules Fire Protection District has adopted a local ordinance which requires automatic fire sprinkler systems in certain type/size of new construction.
All structures shall be protected with automatic fire sprinkler systems in accordance with CA Fire Code Chapter 9 as adopted by the Fire District. CFC 903. g. As mitigation for delays in response time, traffic signal pre-emption (Opticom or compatible) shall be provided on traffic signals lacking same. Locations within the response route to be identified by the District.
h. Review of the Environmental Site Assessment, re-use of the site and implementation of the construction program shall be approved by Certified Unified Program Agency (CUPA), Contra Costa Hazardous Materials Programs, 4585 Pacheco Blvd. Suite Resolution No. 18-058
100, Martinez., CA 94553, [email protected] (925-335-3200).
1. Site address signage per current Fire Department Standards shall be established and maintained during and after any combustible construction or intensification of site use. A complex directory shall be provided at the main entrances. CFC 505. j. Elevators shall accommodate a medical stretcher. The fire resistive smoke assembly used for the elevator must be operable from the elevator cab (by first responders). СВС 607.
k. Required Fire Department access roads shall be signed "No Parking-Fire Lane" per current Fire Department standards and the CA Vehicle Code. CFC 503.
1. Traffic calming measures or controls (speed bumps, humps, undulations, gates, etc.) are not approved as a part of this review and require specific approval from the Fire Department. CFC 503.4.
m. Structures and lockable gates limiting vehicle access to commercial facilities shall be equipped with a Fire Department approved locking device or Fire Department approved key system ("Knox" lock or "Knox" keyed lock). Access controls on fire department response routes shall be electrically operated, equipped with pre- emption and Knox-key override (gates, barriers, retracting bollards, etc.). CFC 506.
n. A bi-directional public safety emergency responder radio system, designed and installed per current Fire Department standards, is required in all new structures.
System can be building specific or a campus-wide system can be provided. CFC o. Rooftop Solar Photovoltaic Systems shall comply with the CA Fire Code and CA State Fire Marshal Guideline. CFC 605.
p. Required Fire Department permits that are eligible for deferred submittal:
Construction; Underground Fire Main, Automatic Fire Sprinkler System, Sprinkler Alarm Supervisor Service (water-flow monitoring), Generator Fuel Storage (if proposed). Operation; Bi-Directional Repeater System. CFC 105. q. The developer shall remit the Fire Development Impact Fee with the Building Permit submittal.
r. The developer shall remit the Rodeo-Hercules Fire District Review Fee 1,2 in the amount of $486.00 for the planning review.
s. The developer shall submit a "Fire Safety During Construction" plan to the Fire District at the time of Building Permit submittal. CFC 3308. t. Emergency Evacuation Guide and signage (entrances, stairwells, elevator lobbies) and Stairwell identification signage shall be provided and submitted to the RHFD for review to ensure all required information is provided in the plan and on the floor plans. CFC 403 & 1023.
u. Storage or use of any hazardous materials at the site (such as diesel fuel for the on- site generator or acid for batteries) will require a Hazardous Materials Business Plan be submitted to the CUPA. CFC 5001.
v. Access roads and water supplies for fire protection shall be installed and made serviceable prior to storage or construction of any combustible materials. CFC 3312. 68) Consolidate Fencing: The fencing plan shall be modified to better consolidate retaining walls with buildings and eliminate double fencing areas as generally shown on the plans into Resolution No. 18-058
a single fence, with the design of the fence, the materials used and location of the single fence subject to the review and approval of the Planning Director. 69) Security Cameras: The Applicant/Developer shall install exterior security cameras for the Self-Storage Facility, in locations as reasonably approved by the Police Department, and shall provide the Police Department with access to the video footage upon request, in compliance with Applicant's/Developer's rights under State and Federal law.
The foregoing Resolution was duly and regularly adopted at a regular meeting of the City Council of the City of Hercules held on the eleventh day of September 2018, by the following vote:
AYES: Council Members: R. Esquivias, M. de Vera, G. Boulanger, Vice Mayor Romero, Mayor Kelley
NOES: None.
ABSTAIN: None.
ABSENT: None.
OF HERCULES Chri Tilley
A COBPOBATHO Chris Kelley, Mayor
*
emails
Lori Martin, MMC
CALIFOR
COSTA COUNTY,
Exhibit A: Hercules Self Storage Presentation Booklet Hercules, CA dated September 11, 2018 Exhibit B: Mitigation Monitoring and Reporting Program (MMRP) Resolution No. 18-058
Exhibit A to City Council Resolution No. 18-058
Hercules Self Storage Presentation Booklet Hercules, CA for City Council September 11, 2018 Meeting containing 45 pages Resolution No 18-058
Exhibit A
HERCULES SELF STORAGE
PRESENTATION BOOKLET
HERCULES, CA
UPDATED FOR THE SEPTEMBER 11, 2018 CITY COUNCIL MEETING
GATES THE C REMONI HERCULES SELF STORAGE
Bellecci COMPANIES, LLC
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9211/2018
REGALIA I
HERCULES SELF STORAGE
HERCULES, CA
TABLE OF CONTENTS
Urban Context .......
Neighborhood Context
Self Storage Elevations ... 5-6
Visual Simulation Context Plan
Visual Simulations .. 8-19
Site Plan ................
Self Storage Site Plan
U-Haul Parking Layout 22.
Unit Mix Plan .....
Office & Apartment . 24
Roof Plan 25
Elevations 26-28
Illustrative Site Plan ......
Landscape Area Take-Off
Plant Pallette ............ . 31
Fence & Wall Plan ........................ 32-33
Automotive Conceptual Architecture ...
Preliminary Grading & Drainage
Preliminary Utility Plan
Site Sections 37.38
Preliminary Cut-Fill Plan 39
Stormwater Control Plan
EVA/ Fire Design =
Vehicle Turning Movements 42-43
Fire Truck Turning Template .44
3D Grading Exhibit 45
GATES , THE CL HERCULES SELF STORAGE TABLE OF CONTENTS
Bollecci COMPANIES, LLC
MILLER STARR HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
RAVE VISTA
Rodeo
The Hercules Self Storage and attendant
automotive uses ("HSS") is located in the eastern
Portion of the City of Hercules, California (the
PROJECT SITE The City is a robust residential community, enjoying wonderful climate, healthily diverse
residential neighborhoods, and is well situated near
employment centers in the Bay Area. However,
Chanal
Hercules River: if Corren Plant O
June Aur Veng cities to obtain such services. Examples of this Luzon
situation would be automotive uses such as car
Mercur washes, quick oil and lube services, automotive
SESHORE
VALLEY VILLAS rey does not have a single seller he
DAK VILLAS Frenkin Crepon C within its entire city limits.
COUNTER RUE
Pinole Sen Pol HSS will provide such needed services in a TINFANT PIDGE location that is very accessible, but at the same time having limited impacts as a consequence of
BIRDS its location. Such a combination is often difficult to achieve; however, in this circumstance, it is a
14.00 pleasant happenstance.
AADSTEN RANCE HSS is situated at the southeastern corner of the Willow Avenue and Palm Avenue intersection.
• Panchy Viet easy ardess from High aye, Will Conse ends Soupies CaNor
HERCULES CITY
LIMITS Palm Avenue, without bringing traffic through
any residential neighborhoods.
A47.
El Sobronte 41 Danger
L'AY VALLE Go gle
es-см.
*VALLI THE CLAREMONT HERCULES SELF STORAGE URBAN CONTEXT PLAN GATES Bellecci ARCHITECTURAL COMPANIES, LIC
ASROGIATES MILLER STARR HERCULES, CALIFORNIA 9/11/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
Hercules Self Storage and attendant automotive
uses ("HSS) is bounded by Palm Avenue to the
west, Willow Avenue and undeveloped land to
SR4 - JOHN MUIR PARKWAY ANS the north; undeveloped land to the east, and the Burlington Northern and Santa Fe Railroad
("BNSF") to the south. State Route 4 (SR-4)
is located approximately 300 feet north of the
HSS site. The City of Hercules General Plan
SR4 - JOHN MUIR PARKWAY ArE WILLOW AVE land use designation and zoning for the project site is General Commercial (CG). Surrounding
land uses include: the Valley Bible Church and
the Valley Preschool and Daycare north of the
site; commercial development and the California
Department of Transportation (Caltrans)
Maintenance Yard to the west: and the BNSF
tracks to the south. South of the BNSF tracks and
Sycamore Avenue are residential neighborhoods.
The self storage element of HSS will be
situated on the eastern portion of the site on
approximately 3.5 acres, and will be comprised
of four buildings having around 840 storage units
WILLOW AVE of about 100.000 rentable square feet. The self SYCAMORE AVE storage will have a leasing office and manager's unit facing Willow Avenue. The self storage will
be attractively fenced and gated.
The automotive service center element of HSS
will occupy the western portion of the site, will
be located on approximately 3.5 acres, and is
anticipated to provide tire and automotive shop
space, an oil change facility, and a car wash of
four self-service and two automated bays.
SYCAMORE AVE
GATES THE CL HERCULES SELF STORAGE NEIGHBORHOOD CONTEXT PLAN Bellecci COMPANIES, LLC
ASSOCIATES HERCULES, CALIFORNIA 9/11/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
COLORS & MATERIALS
OPTION A
CURVED METAL ROOF AT OFFICE:
MBCI METALS "AUTUMN RED"
METAL ROOFS AT STORAGE BUILDINGS:
MBCI METALS: "GALVALUME"
ELASTOMERIC PAINT AT UPPER WALLS & PILASTERS:
SHERWIN WILLIAMS: "MOCHA" #SW 6067
SHERWIN MILLAMS: *BREVITY BROWN A5W 8068
SAN INTERNATON PARO RE
LEDGERSTONE VENEER BASE:
CORONADO "DAKOTA BROWN"
HERCULES
SELF•
STORAGE
GATES VALL THE CLAREMO HERCULES SELF STORAGE SELF STORAGE ELEVATIONS Bellecci COMPANIES, LLC
ASSOCIATES GROUP MILLER STARR HERCULES, CALIFORNIA 911/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
BLDG A SOUTH ELEVATION
BLDG A NORTH ELEVATION
GATES THEC HERCULES SELF STORAGE SELF STORAGE ELEVATIONS Bellecci COMPANIES, LLC
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 911/2018
HERCULES SELF STORAGE
HERCULES, CA
The visual simulations following this page were
SR4 - JOHN MUIR PARKWAY st taken from a number of points surrounding the Hercules Self Storage site, as follows:
• Visual Simulation IA. This is a view from
street level, situated across the street from
SR4 - JOHN MUIR PARKWAY AVE WILLOW AVE the main entrance on Willow Avenue. • Visual Simulation l. This is a view from the
residences at the end of Poppy Court, situated
south of the BNSF tracks and Sycamore
Avenue.
• Visual Simulation 2. This is a view from
the Valley Bible Church parking lot facing
southeast across Willow Avenue.
• Visual Simulation 3. This is a view from
the intersection of Willow Avenue and Palm
Avenue, facing southeast toward the project.
• Visual Simulation 4. This is a view from
WILLOW AVE SYCAMORE AVE the Willow Avenue overpass of Highway 4, facing south.
• Visual Simulation 5. This is a view from the
Foxboro Park, which is north of Highway 4.
This is a view facing to the southeast across
Highway 4.
It should be noted that for each visual
simulation, there is an illustration that presents
SYCAMORE AVE Hauserapon at pressie manhage great are
ten years.
200 400
L 10°
VALET THE HERCULES SELF STORAGE VISUAL SIMULATION CONTEXT PLAN GATES 2 Bellecci ARCHITECTURAL COMPANIES, LLC
ASSOCIATES REGAT STARR HERCULES, CALIFORNIA 9711/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 6 MONTHS
GATES VALLI THEC HERCULES SELF STORAGE VISUAL SIMULATION IA Bellecci COMPANIES, LLC
ASSOCIATES HERCULES, CALIFORNIA 9/11 2018
MIGAR STARR
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 10 YEARS
GATES THE CLAREMON HERCULES SELF STORAGE VISUAL SIMULATION IA Bellecci COMPANIES. ILC
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9111/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 6 MONTHS
GATES THE CLAREMON HERCULES SELF STORAGE VISUAL SIMULATION I Bellecci COMPANIES, LLC 10
ASSOCIATES HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 10 YEARS
GATES * VALLI HE CLAREMON HERCULES SELF STORAGE VISUAL SIMULATION I Bellecci ROHTECTIRA 11
COMPANIES LIC
ASSOCTATES BILE STARR HERCULES, CALIFORNIA 9:11/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 6 MONTHS
GATES VALLI HERCULES SELF STORAGE VISUAL SIMULATION 2
Bellecci C COMPANES LIC 12
ASSOCIATES HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 10 YEARS
GATES VALLI THE C ADEMOI HERCULES SELF STORAGE VISUAL SIMULATION 2 Bellecci ARCHITECTURAL COMPANIES UC 13
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9711/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 6 MONTHS
GATES VALLI HERCULES SELF STORAGE VISUAL SIMULATION 3
Bellecci COMPANIES, LLC 14
ASSOCIATES HERCULES, CALIFORNTA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 10 YEARS
GATES A VALLI THE HERCULES SELF STORAGE VISUAL SIMULATION 3 Bellecci COMPANIES, LLC 15
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9/11/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 6 MONTHS
VALLI HERCULES SELF STORAGE VISUAL SIMULATION 4
GATES Bellecci COMPANIES, LLC 16
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9111/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 10 YEARS
GATES VALLI THE CLAREMOI HERCULES SELF STORAGE VISUAL SIMULATION 4 Bellecci AECHITECTURAL COMPANIES LIC 17
ASSOCIATES HERCULES, CALIFORNIA 911/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 6 MONTHS
VALLI THE CI HERCULES SELF STORAGE VISUAL SIMULATION 5
GATES Bellecci COMPANIES, LIC 18
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
BEFORE
AFTER - 10 YEARS .
VALLI THE CLAREMONI HERCULES SELF STORAGE VISUAL SIMULATION 5 GATES Bellecci ARCHITECTURAL COMPANIES, LLC 19
ASSOCIATES HERCULES, CALIFORNIA 911/2018
HERCULES SELF STORAGE
HERCULES, CA
:S:5: Macon C
0: WILLOW AVE.
A
Bing
AUTO SERVICES
9,335 SF
• CAR WASH 3,572 SF
BNSE RAILROAD
LEGEND
PROPORT LAR
- - ANSTEO PROPORTY LAE
SICPC - T00 * TOC
1 3 20 0
VALLI THE C HERCULES SELF STORAGE SITE PLAN
GATES Bellecci POLE TIRAI COMPANES, LLC 20
ASSOCIATES MEGAER STARR HERCULES, CALIFORNIA 9711/2018
HERCULES SELF STORAGE
HERCULES, CA
Прод
•F
anot
BUILDING AREAS
URDING "A' 3,732 SQ. FI,
9.384 SQ. FI.
BUILDING 'C
SO SUBTOTAL 124121 S05
OFRCE / APT. 380 SQ. F.
OTAL 126,998 SQ. FT.
SCALE: 1°a30-0r
GATES VALLI THE CLAREMONT HERCULES SELF STORAGE SELF STORAGE SITE PLAN Bellecci COMPANIES. LLC 21
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 911:2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
AUTO SERVICES
FOENO
BNSF RAILROAD - - A PROPERTY LINE
Slope - TOP & TOE
SANSE WHI
PALM A VITO MANO
Deva Balone You Ca AVE.
SOLE NOT
PRELIMINARY
1-800-227-2800
лет 20, 2018
GATES VALLI THE HERCULES SELF STORAGE U-HAUL PARKING LAYOUT Bellecci COMPANIES, LLC 22
ASSOCIATES HIGARSTARR HERCULES, CALIFORNIA 9/1/2018
HERCULES SELF STORAGE
HERCULES. CA
2/154
13 133 PAo so To -30s, 1A000D
NO INO 1ACO
BLDG 'D' THIRD FLOOR | ova| 00/100/1210/000
/003/060g
i3; as sa
60 215
RA CHO 009 COE O90
TESTETE
BLDG 'A'
10 10 100 000 x 00s Do bas 1a 1o
BLDG 'D' SECOND FLOOR
to no to do to do do so do ka bo l noism is 00o to ta
BLOG 8'
BLDG 'C'
UNITMIX TABULATION
1 1030 and d Mo. OF
1 aco neo SIZE OF UNIT SOFTUNT REO. UMIS
aro ado DO KNO EXO ENO INO IND
73 г
343403-0
as as a an and on
0 as as no a bo hs as as as as as as
BLDG 'D' ARST FLOOR
GATES COMPANES LIG HERCULES SELF STORAGE UNIT MIX PLAN
Bellecci 23
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9/11/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
SCALE: 11r-r-0
GATES ASCHECTEN THEC PEMONT HERCULES SELF STORAGE OFFICE & APARTMENT Bellecci COMPANIES, LIC 24
ASSOCIATES MIGER STARR HERCULES, CALIFORNIA 9/1//2018
HERCULES SELF STORAGE
HERCULES, CA
SCALE = 1630-0
GATES THE CLAREMONI HERCULES SELF STORAGE ROOF PLAN
3 Bellecci COMPANIES, LLC 25
A sOCIATES 2GOUP MEAN STARR HERCULES, CALIFORNIA 911/2018 1,0 POO HERCULES SELF STORAGE
HERCULES, CA
OFFICE & APT WEST ELEVATION BLDG A SOUTH ELEVATION
BLDG A EAST ELEVATION BLDG A NORTH ELEVATION
SO CA HAT
0-00 avor
BLDG B EAST ELEVATION BLDG B SOUTH ELEVATION
Lo rever
BLDG B WEST ELEVATION BLDG B NORTH ELEVATION
SCALE - 1°-30:00
VALLI HERCULES SELF STORAGE ELEVATIONS
GATES Bellecci COMPANIES LIC 26
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9:11/2018
HERCULES SELF STORAGE
HERCULES, CA
BLDG C SOUTH ELEVATION
BLDG C NORTH ELEVATION
BLDG C EAST ELEVATION BLDG C WEST ELEVATION
SCALE-TWEE
GATES THE CLAREMONT HERCULES SELF STORAGE ELEVATIONS
Bellecci ARCHRECTURAL COMPANIES, LLC 27
ASSOCIATES HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
BLDG D EAST ELEVATION BLDG D WEST ELEVATION
205.000/
TA ROLL T
BLDG D SOUTH ELEVATION
BLDG D NORTH ELEVATION
SCALE = 1%530-0
GATES HERCULES SELF STORAGE ELEVATIONS
Bellecci COMPANIES, LC 28
ASSOCIATES MIGER STARR HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
Entry Couryard w/ Flowering
Trees, Bench & Pots
Non Irrigated Hydroseed Mix
WILLOW AVE Coast Live Oak Screen Trees
Flowering Trees &
Vibrant Planting at
Entry
Entry I/D/ Sign Walls
Flanking Entry Drive /
Enhanced Entry Paving
Flowering Vines
Parking Lot Shade Tree -
Street Trees.
w/ Creeping Groundcover Austrailian Willow Screen Tree with along slope, Typical.- Native Shrubs or Groundcover
Evergreen Trees Evergreen Shrubs
w/ Native Grass
Understo Native and Drought Tolerant
Shrubs and Groundcover
Jurisdictional Wetland (Avoided)
Self Storage
Parking Lot Light Pole, Typ.
Automotive Related
Bio-Retention Area,
w/ Bio-Retention Seed
Mix
I :l Slope Stabilization SCALE: 1-50-05
& Planting per
Geotechnical Engineer.
TVALLI THE CLAREMONI HERCULES SELF STORAGE ILLUSTRATIVE SITE PLAN GATES Bellecci LRCHTECTURAL COMPANIES, LLC 29
ASSOCIATES HERCULES, CALIFORNIA 9/11:2018
HERCULES SELF STORAGE
HERCULES, CA
Irrigated Bio Retention Basin (12,880 SQ FT)
Irrigated Planting Area (81,210 SQ FT)
Total Irrigated Landscape Area
94,090 SQ FT
Total Landscape Area
113,510 SQ FT
Iotal Site Area
304.915 SO FT
• LANDSCAPE AREA = 31%
GATES VALLI HERCULES SELF STORAGE LANDSCAPE AREA TAKE-OFF ANTONERA 30
Bellecci COMPANIES, LLC
ASSOCIATES HERCULES, CALIFORNTA 911/2018
MIGHER STARR
HERCULES SELF STORAGE
PLANT IMAGES PLANT LIST HERCULES, CA
BOTANICAL NAME COMMON NAME WATER USE
STREET TREES
TREES Pistacla chinensis Chinese Pistache (Multi-Trunk) Robinia x ambigua Pink Flowering Locust
Tilla cordata Uttleleaf Linden
Ulmus parvifolia Chinese Elm
Zelkova serrata City Sprite Zelkova
ACCENT TREES
Acer rubrum 'Armstrong' Armstrong Red Maple
Arbutus x 'Marina Strawberry Tree
Cercis Occidentalis Wester Redbud
Gellera parvifolla Australian Willow
Lagerstroemia "Muskogee' Muskogee Crape Myrde
Acer rubrum Armstrong' -ercis occidentalis Geljera parviflora Lagerstroemia i. 'Muskogee' • Photinia x fraseri Photinta x fraseri Post Live Oake Armstrong Red Maple Arbutus Standard Western Redbud Australian Willow Muskogee Crape Myrtle Photinla Quercus agrifolla
SHRUBS/VINE/GROUNDCOVERS
Carex phyllocephala Sedge
Cistus salvifollus Sageleaf Rockrose
Dietes vegeta African Iris
Erica x darleyensis Darley Heath
Euonymus fortunel Emerald Gaolty Euonymus
Hemerocallis "Bitsy' Yellow Daylily
juncus patens California Grey Rush
Lavandula angustifolla English Lavender
Leymus triticoldes Wild Rye
Lirlope muscari Llly Turf
Lomandra 'Breeze' Dwarf Mat Rush
Pistacia chinensis Quercus agrifolia Robinia x ombigue Ulmus parvifolia Zelkora serrata Myoporum parvifolium putah Creek Myoporum Chinese Pistache Multi-Trunk Coast Live Oak Pink Flowering Locust Littleleaf Unden Chinese Elm Clty Sprite Zelkova Osteospermum fruticosum Freeway Daisy (Street Tree) (Street Treo) (Street Tree) (Street Tree) (Street Tree) Phormium "Yellow Wave' New Zealand Flax Rosmarinus officinalis Rosemary
Salvia officinalis Garden Sage
Thmus vulgaris Common Thyme
SHRUBS/VINE/GROUNDCOVERS Westringia frutescens American Westringla Corex phyllocephala Hater yereta Erica x darleyensis Hemerocallis x bitsy (uncus patens Lavandula angustifolia Leymus triticoldes Liriope muscori Sedge African Iris Darley Heath Emerald Galety Euonymus Yellow Daylily California Gray Rush English Lavender Wild Rye Lily Turf Lomandra longifolia 'Breeze' Phormium tenax "Yellow Wave' Rosmorinus officinalis Salvia officinalis Thymus vulgaris Wisteria frutescens Cistus salvifolius Myoporum parvifolium Osteospermum fruticosum Dwarf Mat Rush Now Zeland Flax Rosemary Garden Sage Common Thyme American Wisteria Sageleaf Rockrose Putah Creok Myoporum Freeway Daisy
GATES THE C HERCULES SELF STORAGE PLANT PALETTE
Bellecci LeCH COMPANIES, LLC 31
ASSOCIATES GROUP MILLER STARR HERCULES, CALIFORNIA 911/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
Gate
WILLOW AVE 0 D
2°
EVA Gate
FENCE & WALL LEGEND
Monument Sign
Retaining Wall
Bio-Retention Area 7' Ornamental Iron Fence (Integrated if needed on Retaining Wall)
3'6" Wrought Iron Fence on top of
Decorative CMU Wall
GATES MACHETURN HERCULES SELF STORAGE FENCE & WALL PLAN Bellecci CHOMPANES, LIC 32
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
1444
Reliable Auto Repair ERCULES 7' ORNAMENTAL METAL FENCE
Hercules Auto Parts •SELF.
City Car Wash STORAGE
CONCEPTUAL MONUMENT SIGN (36 SQ. FT. SIGN COPY PER SIDE) NOT TO SCALE CONCEPTUAL 3'6" WROUGHT IRON FENCE
ON TOP OF 3' CMU RETAINING WALL
6' CHAIN LINK FENCE W/ BLACK VINYL COATING
TAN RETAINING WALL
GATES VALLI THE CLAREN HERCULES SELF STORAGE FENCE & WALL IMAGES Bellecci COMPANIES, LLC 33
ASSOCIATES MEGAL STARR HERCULES, CALIFORNIA 9112018
HERCULES SELF STORAGE
HERCULES, CA
ERONT VIEW
SIDE VIEW COMPARABLE ARCHITECTURE
CONCEPTUAL AUTO SERVICES ELEVATION
FRONT VIEW SIDE VIEW COMPARABLE ARCHITECTURE
CONCEPTUAL CAR WASH ELEVATION
FRONT VIEW SIDE VIEW
COMPARABLE ARCHITECTURE
CONCEPTUAL EXPRESS LUBE ELEVATION
GATES VALLI THE CLAREMON HERCULES SELF STORAGE AUTOMOTIVE CONCEPTUAL ARCHITECTURE Bellecci ARCHTECTURAL 34
ASSOCIATES GROUP COMPANIES, LLC
MEGAR STARR HERCULES, CALIFORNIA
HERCULES SELF STORAGE
HERCULES, CA
4-118S
9,555 SF
CARWASH 3,572 SP
OPERTY LINE
- 108-
BNSF. RAILROAD:
DESTNO CONTOUR (UNOR)
----101-- - PROPOSED CONTOUR (NILORO
• SLOPE - TOP & TOE
PALM WALLEY GUTTER
1H55 PROPOSED STORM DRADE UNE
STORM CRUDE NUT
_ _ CUT-AL. LINE
SECTON A-A
SCALE: 1-10-05
GATES VAL L THE CLAREMONI HERCULES SELF STORAGE PRELIMINARY GRADING & DRAINAGE PLAN Bellecci COMPANIES, LLC 35
ASSOCIATES MEGA STARR HERCULES, CALIFORNIA 9:11:2018
HERCULES SELF STORAGE
HERCULES, CA
MOTIM
• 13-1188
MITO SERVICES
PROPERTY LINE
LEGEND
PROPERTY UNE
1: 50 I52+ PROPOSED STORE DRAIN LINE
STASINO WALL
20-1868 BNSF RAILROAD
OR CRANE MAS-OLE
TORM CRAN DEST
WITARY SEWER LINE
SANITARY SEVER MANHOLE
PALM AVE. DETECTOR CHECK VOLVE ASSONALY
• •
FRE HYDRANT
GATES VALLI THE CI HERCULES SELF STORAGE PRELIMINARY UTILITY PLAN Bellecci ARCHTECTURAL COMPANIES, LLC 36
ASSOCIATES MEGAER STARR HERCULES, CALIFORNIA 9112018
HERCULES SELF STORAGE
HERCULES, CA
AUTO SLAMICES
DRAECY ROIINDARY
EXISTING CONTOUR
PROPOSED CONTOUR
TOE-TOP OF SLOPE
CUT-FILL LINE
RETAINING WALL
EDGE OF NEW PAVEMENT
PROPOSED FOOTPRINT
EXISTING WETLAND
PARKING
SECTION A-A
VERTICAL 1-20 SCALE: 1-40.00
ORZONTAL 1*-t0
GATES VALLI THE CLAREMONI HERCULES SELF STORAGE SITE SECTIONS Bellecci COMPANIES. LLC 37
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 911/2018
REGALIA.
HERCULES SELF STORAGE
HERCULES, CA
CURRENT N PROJECT SECTION E-E
SECTION B-B ULTIMATE
HORIZONTAL 1%20' HORIZONA 1-00
1122122-12-40-12
SECTION C-C SECTION F-E SECTION F-E.
ERTICAL 1°-10° CURRENT + PROJECI ULTIMATE
HORIZONTAL 1-20 VERTIOM, 1'-10
ICRIZONTAL 1°20
RETARING
DRIVEWAY
5....
SECTION D-D SECTION G-G SECTION G-G
CURRENT + PROJECT ULTIMATE
VALIT HERCULES SELF STORAGE SITE SECTIONS
GATES Bellecci ARCHTECTURAL COMPANIES, LIC 38
ASSOCIATÉS HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
AUTO SERVICES
LEGEND
- PROPERTY UNC
EXISTING CONFOUR (VINOR)
"DESTING CONTOUR CULOR)
--185--- PROPOSED CONTOUR (HANOR)
BNSF RAILROAD - SLOPE - TOP & TOX
RETANNO WALL
• BULDING OUTUNE
t 119g.
PALM
GATES VALLI THEO AREMON HERCULES SELF STORAGE PRELIMINARY CUT FILL PLAN Bellecci COMPANIES, LIC 39
ASSOCIATES MEGASTARD HERCULES, CALIFORNIA 9.11/2018
IMP SIZING SUMMARY HERCULES SELF STORAGE
HERCULES, CA
SAK AREA
жи 18 169 CONCRETE I TO 0.15
DUA HATE ARCA (SE) SURFACE LA OMA AREA
2000
021. 10
CONV ROOF 10
18882
IVE.
WILLOW 650023
RAILROAD LEGEND
BNSF I PROJECT BOUNCMET
* STORM CRAM • OMA BOUNDARY
PALM AVE. PROPOSED STORM DRAN UNE
OPOSCO CONTOUR ORICE DAWETER (3.77) CONNECTS TO SD 1.r Box.
IOUS CHA - CCMMOXTIOHAL ACOR
DO MOT COMPACT
DUS OUR - ASPULT CONCRETE
TAMOUS OKA - LANDSCAPE
U- TREATING DMA - LANDSCAPE
POTENT-S BASH
IYPICAL SECTIO SA- C.3 BASIN
STORM DRAN NLET
HETLAND BOUNDARY BERTION AUTY SHOULD BE CONSTUCTED PER OTY SANCARD.
VALLI THE CI HERCULES SELF STORAGE STORMWATER CONTROL PLAN GATES Bellecci ARCHITECTURAL COMPANIES, LLC 40
ASSOGIATES MIGHT STARR HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
USA NORTH 81) HERCULES, CA
Call (fi Before You Dig
BULONG C
...
AUTO SERVES
BNSF. RAILROAD
LEGEND
PALM AVE. PROJECT BOUNDARY
EXISTING CONTOUR
PROPOSED CONTOUR
TOE-TOP OF SLOPE
RETAINING WALL
EDGE OF NEW PAVEMENT
PROPOSED FOOTPRINT
EXISTING WETLAND
777774 OF TRAN MOVEMENT PATH
GATES THE CLAREMONT HERCULES SELF STORAGE EVA/ FIRE DESIGN * Bellocci COMPANIES, LLC 41
ASSOCIATES MILLER STARR HERCULES, CALIFORNIA 9112018
REGALIA.
HERCULES SELF STORAGE
HERCULES, CA
SCALE: 1-494
SCALE: 1'=20:05 CHURCH DRIVEWAY
WILLOW AVE
CAR WASH 5,572 SF
WILLOWI
APN
403-522-001-5
BNSF RAILROAD
PATH OF FRONT WERE PAPI PATH CAUTOR LEGAL DESIRE VEHICLE SU-30 SMOLE UMT IRUCK ISCU-SIRACE). PASSENGER. CAR. (CHURCHD.
TURNING MOVEVENT: NEOUND LEFT TURNS
URNING MOVEMENT: OUTBOUND LEFT TURNS
CALIFOEMA LEGAL DESIAL YEHOLE: SU-30 SINGLE UNT TRUCK. (SELF-STORAGE) & P-PASSENGER, CAR. (CHUBCH). B8.
TURNING MOVOMENT: RASCEND LEFT TUMS
THIS EXHIBIT DEPICTS PASSENGER VEHICLES ENTERING
AND EXITING THE CHURCH DRIVEWAY VIA LEFT TURNS;
AND 30' SINGLE UNIT MOVING TRUCKS ENTERING AND
EXITING THE SELF-STORAGE /COMMERIAL FACILITY 20.00 П
DRIVEWAY VIA LEFT TURNS. Twir
,00 FT
LEGEND
---- PROJECT BOUNDARY
EXISTING CONTOUR
PROPOSED CONTOUR SASHTO 2004 (US) ASHTO 2004 (US)
TOE-TOP OF SLOPE
RETAINING WALL
EDGE OF NEW PAVEMENT
PROPOSED FOOTPRINT
EXISTING WETLAND
CE CRAZA OF TRAG LOVEMENT PATH
GATES MACATECTURN THE CLAREMONT HERCULES SELF STORAGE VEHICLE TURNING MOVEMENTS Bellecci COMPANIES, LLC 42
ASSOCIATES HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
SCALE: 1200-0
18.02 06
-24.1230-
VALLI THEO HERCULES SELF STORAGE VEHICLE TURNING MOVEMENTS GATES Bellecci ARCHITECTURBAL 43
ASTOGIATES MILLER STARR COMPANIES, LLC HERCULES, CALIFORNIA 9/11/2018
REGALIA
HERCULES SELF STORAGE
HERCULES, CA
WLLOW AVE WILLOW AVE
STOR
ONE-WAY TORY STOR
ONE-WAY -TOP
1B-
WLLOW AVE. WILLOW AVE.
RIGHT TURN PALM AVE. (LEET LANE) TO WILLOW AVE. (RIGHT LANE) RIGHT TURN PALM AVE. (RIGHT LANE) TO WILLOW AVE, (RIGHT LANE)
FITS WITHIN PROPOSED INTERSECTION IMPROVEMENTS REQUIRES ADDITIONAL INTERSECTION IMPROVEMENT DESIGN LEGEND
PROJECT BOUNDARY
EXISTING CONTOUR
PROPOSED CONTOUR
10E-TOP OF SLOPE
- - CUT-FILL LINE
• RETAINING WALL
Isodten Aste Ece Toucta EDGE OF NEW PAVEMENT
PROPOSED FOOTPRINT
EXISTING WETLAND
•VALLI THE CLAREMO HERCULES SELF STORAGE FIRE TRUCK TURNING TEMPLATE GATES Bellecci AECHTECTURAL COMPANIES, LIC 44
ASSOCIATES REGAR STARR HERCULES, CALIFORNIA 9/11/2018
HERCULES SELF STORAGE
HERCULES, CA
WILLOW AVE.
PALM AVE,
BEFORE
WILLOW AVE.
PALM AVE.
AFTER
GATES THE CLAREMON HERCULES SELF STORAGE 3D GRADING EXHIBIT Bellocci COMPANIES, LLC 45
ASSOCIATES HERCULES, CALIFORNIA 9/11/2018
Exhibit B to City Council Resolution No. 18-058
Mitigation Monitoring and Reporting Program (MMRP)
FIRSTCARBONSOLUTIONS™
Mitigation Monitoring and Reporting Program
for the
Willow Avenue Commercial Center Project Initial
Study/Mitigated Negative Declaration City of
Hercules, Contra Costa County, California
Prepared for:
City of Hercules
Planning Department
111 Civic Drive
Hercules, CA 94547
510.799.8251
Contact: Holly Smyth, Planning Director
Prepared by:
First Carbon Solutions
1350 Treat Boulevard, Suite 380
Walnut Creek, CA 94597
925.357.2562
Contact: Jason Brandman, Project Director Janna
Waligorski, Project Manager
Report Date: August 1, 2018
NORTH AMERICA | EUROPE | AFRICA | AUSTRALIA | ASIA
WWW.FIRSTCARBONSOLUTIONS.COM YAN ADEC INNOVATION
Resolution No 18-058
Exhibit B
THIS PAGE INTENTIONALLY LEFT BLANK
Resolution No 18-058
Exhibit B
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1: Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial Air Quality
MM AQ-1: In order to ensure all the impacts are less than City Staff will confirm that Prior to the issuance City of Hercules significant, the project applicant shall: all off-road construction of grading permits. a) Ensure all off-road construction equipment greater than 50 equipment meets EPA Tier horsepower must be equipped with engines meeting the IV emission standards; or, EPA Tier IV emission standards; or the applicant will submit b) Prior to issuance of grading permits, the project applicant modeling memorandum shall submit a revised air quality emissions and health risk ensuring emissions will be assessment modeling results demonstrating that the below the BAAQMD's air project-specific detailed construction equipment list to be quality and health risk used and the construction schedule to be followed by the thresholds. general contractor would result in emissions below the
BAAQMD's air quality and health risk thresholds.
Biological Resources
MM BIO-1: Prior to the start of construction activities, City Staff will visually Prior to issuance of City of Hercules temporary fencing shall be installed around the wetland area. verify that a fence has grading permits.
No construction equipment or activities, including the been installed. stockpiling of soils, shall be allowed within the fenced area.
The temporary fencing shall be removed when construction activities are completed.
Cultural Resources
MM CUL-1: Because of the moderate potential for City Staff will verify that Prior to issuance of City of Hercules undiscovered cultural resources within the project area, a the Applicant has hired a grading permits. qualified archaeologist shall be present during the initial phase qualified archaeologist to of ground disturbance and grading in order to check for the be present during the inadvertent exposure of cultural materials. The initial phase of initial phase of ground ground disturbance shall be deemed the grading operation disturbance. that includes removal of organic material along the surface of the site. For areas to be excavated and soil removed, the upper 3 feet of removals shall be deemed initial ground FirstCarbon Solutions
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1 (cont.): Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial disturbance. On areas to receive fill, scarification and moisture conditioning occurring on the upper 12 to 18 inches shall be deemed the initial ground disturbance. This may be followed by regular periodic or "spot-check" archaeological monitoring as needed by a full-time archaeological monitoring who meets the Secretary of Interior's Professional Qualification Standards for archaeology, as well as a Tribal Cultural Monitor. If a potentially significant cultural resource is encountered during subsurface earthwork activities, all construction activities within a 100-foot radius of the find shall cease and workers should avoid altering the materials until the Archaeologist or Tribal Monitor has evaluated the situation and provided appropriate
recommendations. Project workers shall not collect or remove any cultural resources. The Applicant shall include a standard inadvertent discovery clause in every construction contract to inform contractors of this requirement. Any previously
undiscovered resources found during construction activities shall be recorded on appropriate Department of Parks and Recreation (DPR) forms and evaluated for significance in terms of CEQA criteria by a qualified archaeologist. Potentially significant cultural resources consist of but are not limited to stone, bone, glass, ceramics, fossils, wood, or shell artifacts, or features including hearths, structural remains, or historic dumpsites. If the resource is determined significant under CEQA, the qualified archaeologist shall prepare and implement a research design and archaeological data recovery plan that will capture those categories of data for which the site is significant in accordance with Section 15064.5 of the CEQA Guidelines. The archaeologist shall also perform appropriate technical analyses, prepare a comprehensive report complete with methods, results, and recommendations, and provide for the permanent curation of the recovered resources. The report shall be submitted to the City of Hercules, the Northwest Information Center, and the State Historic Preservation Office (SHPO), if required.
FirstCarbon Solutions N
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1 (cont.): Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial MM CUL-2: In the event that fossils or fossil-bearing deposits Applicant will ensure that, Ongoing during Applicant/City of are discovered during construction activities, excavations in the event that fossils or construction. Hercules within a 100-foot radius of the find shall be temporarily halted fossil-bearing deposits, or diverted. The project contractor shall notify a qualified work is stopped within a paleontologist to examine the discovery. The applicant shall 100-foot radius and a include a standard inadvertent discovery clause in every qualified paleontologist is construction contract to inform contractors of this contacted. requirement. The paleontologist shall document the discovery as needed in accordance with Society of Vertebrate
Paleontology standards and assess the significance of the find under the criteria set forth in CEOA Guidelines Section 15064.5. The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction activities are allowed to resume at the location of the find. If the Applicant determines that
avoidance is not feasible, the paleontologist shall prepare an excavation plan for mitigating the effect of construction activities on the discovery. The plan shall be submitted to the City of Hercules for review and approval prior to
implementation, and the Applicant shall adhere to the
recommendations in the plan.
MM CUL-3: In the event of the accidental discovery or Applicant will ensure that, Ongoing during Applicant recognition of any human remains, CEQA Guidelines Section in the event accidental construction. 15064.5, Health and Safety Code Section 7050.5, and Public discovery or recognition Resources Code Sections 5097.94 and 5097.98 must be
followed. If during the course of project development there is Work is storemains a accidental discovery or recognition of any human remains, the 100-foot radius and the following steps shall be taken: County Coroner is
1. There shall be no further excavation or disturbance within contacted. 100 feet of the remains until the County Coroner is
contacted to determine if the remains are Native American and if an investigation of the cause of death is required. If FirstCarbon Solutions
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1 (cont.): Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial the coroner determines the remains to be Native American, the coroner shall contact the Native American Heritage
Commission (NAHC) within 24 hours, and the NAHC shall
identify the person or persons it believes to be the most likely descendant (MLD) of the deceased Native American.
The MLD may make recommendations to the landowner or
the person responsible for the excavation work within 48 hours, for means of treating or disposing of, with
appropriate dignity, the human remains and any associated grave goods as provided in PRC Section 5097.98.
2. Where the following conditions occur, the landowner or his or her authorized representative shall rebury the Native American human remains and associated grave goods with
appropriate dignity either in accordance with the
recommendations of the most likely descendant or on the project site in a location not subject to further subsurface • The NAHC is unable to identify a most likely descendent or the most likely descendent failed to make a
recommendation within 48 hours after being notified by
the commission.
• The descendant identified fails to make a recommendation. • The landowner or his authorized representative rejects the recommendation of the descendant, and mediation by the
NAHC fails to provide measures acceptable to the
Additionally, California Public Resources Code Section 15064.5 requires the following relative to Native American remains:
When an initial study identifies the existence of, or the probable likelihood of, Native American remains within a project, a lead agency shall work with the appropriate Native Americans as identified by the NAHC, as provided in Public FirstCarbon Solutions
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1 (cont.): Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial Resources Code Section 5097.98. The applicant may develop a plan for treating or disposing of, with appropriate dignity, the human remains, and any items associated with Native
American burials with the appropriate Native Americans as identified by the NAHC.
Geology and Soils
MM GEO-1: Prior to final project approval, the project Applicant will incorporate Prior to issuance of City of Hercules applicant shall incorporate earthwork, grading, foundation Preliminary Geotechnical grading permits. support, and other recommendations regarding project design Evaluation and construction in the Preliminary Geotechnical Evaluation recommendations, City prepared by ENGEO Incorporated on November 16, 2017. Staff will verify.
MM GEO-2: Prior to final project approval, the project Applicant will incorporate Prior to issuance of City of Hercules applicant shall incorporate recommendations regarding Preliminary Geotechnical grading permits. expansive soils in the Preliminary Geotechnical Evaluation Evaluation prepared by ENGEO Incorporated on November 16, 2017. As recommendations, City noted in Section 5.7 of the Preliminary Geotechnical Staff will verify.
Evaluation, the following alternatives shall be incorporated to reduce the effects of expansive soils on building foundation and improvements:
• Construct the upper 24 inches of the building pads extending at least 10 feet laterally beyond building areas with selected fill derived from excavations in lower plasticity bedrock.
Because of the distribution of expansive materials on-site, selective grading may be difficult to perform. Alternatively, if selective grading cannot be performed building pads shall be constructed with imported non-expansive fill.
• Lime treat the upper 24 inches of the building pad to reduce the expansion potential of the on-site soil.
FirstCarbon Solutions
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1 (cont.): Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial
7. Greenhouse Gas Emissions
MM GHG-1: Prior to the issuance of the final Certificate of Applicant will provide Prior to issuance of City of Hercules Occupancy, the project applicant shall provide documentation documentation the final Certificate demonstrating that it has purchased carbon offsets from local demonstrating purchase of Occupancy. or regional registries in the amount of 250 MT CO2e per year of carbon offsets, per the for the expected determined life of the project (20-years). The mitigation measure. chosen registry must have California Air Pollution Control Officers Association (CAPCOA)-approved protocols.
16. Transportation/Traffic
MM TRANS-1: Prior to the issuance of occupancy permits, the Applicant will make, or Prior to the issuance City of Hercules applicant shall make the following improvement: provide a bond, for the of occupancy • Restripe and widen Willow Avenue on the south side improvement. permits. approaching Palm Avenue and the Willow/Palm Intersection to include a second westbound through lane to provide
separate left-turn and through/right-turn lanes in the
westbound direction, and modification of the southeast
corner curb radius to accommodate right turns by trucks from northbound Palm Avenue to eastbound Willow
Avenue, thereby ensuring that provision of the left-turn lane will not impede emergency access.
MM TRANS 2, Pior to the isuance of construction permits, Applicant will provide Prior to the issuance City of Hercules the applicant shall ensure there is adequate room for future engineering drawings for of construction Class II bike lanes in the ultimate widened configuration of review by City Staff. permits.
Willow Avenue bordering the project site.
MM TRANS-3: Prior to the issuance of occupancy permits, the Applicant will provide Prior to the issuance City of Hercules applicant shall provide engineering drawings for review by City engineering drawings for of occupancy staff confirming the provision of adequate stopping sight review by City Staff. permits. distance at the project driveway, and adequate sight-distance for permissive left-turns relevant to the westbound left-turn into the project site. Following project completion, the FirstCarbon Solutions
City of Hercules-Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Table 1 (cont.): Willow Avenue Commercial Center Project Mitigation Monitoring and Reporting Program Verification of Completion
Responsible for
Mitigation Measures Method of Verification Timing of Verification Verification Date Initial applicant shall ensure that adequate maintenance is provided to ensure that vegetation growth will not impeded the
necessary sight distance.
FirstCarbon Solutions
THIS PAGE INTENTIONALLY LEFT BLANK