Contra Costa Countywide Smart Signals
City of Hercules City Council Meeting
John Hoang
Director, Planning
3/26/2024
IMPROVE SAFETY,
MINIMIZE CRASHES,
ELIMINATE
INJURIES +
FATALITIES,
VISION ZERO
OPTIMIZE MOBILITY,
RELIEVE
CONGESTION +
MANAGE
EVACUATION ROUTES
ADVANCE THE
SMART COUNTY
SYSTEM /
PREPARE
ARTERIALS FOR
THE FUTURE
SMART SIGNALS Goals
• Supports multi-modal transportation for all users
• Increases safety
• Increases transit reliability
• Improves emergency vehicle response time
• Relieves congestion
Key
Benefits
How does the
SMART Signal
System work?
• Pedestrian and bicycle detection system supports
proactive identification and prevention of “near miss”
situations
• Signal Synchronization controls and smooths traffic flow • Signal Control and Prioritization (SCP) to
• Reduce emergency vehicle response time
• Increase transit reliability
• Effectively manage arterial traffic during day-to day operations, major incidents on freeway, evacuations,
or major events
• Real-time monitoring of traffic conditions allows
CCTA/cities/Caltrans access to monitor all videos and
signals to optimize operations
• Connected infrastructure to support deployment of
connected and autonomous vehicles (V2X, V2I, V2P)
SMART SIGNALS
SMART COUNTY
1 2 3 4 5
Five Steps to a SMART City System
SMART Signal Improvements
UPGRADE TO ADVANCED
CONTROLLERS & ATC CABINETS
BENEFIT: ADVANCED MOBILITY
FIBER OPTIC/CELLULAR
COMMUNICATION
BENEFIT: Better Capacity and
Reliability
VIDEO DETECTION
BENEFIT: Unobtrusive
Monitoring and Managing of the
Road Network
VULNERABLE ROAD USER PROTECTION
BENEFIT: Pedestrian Safety and Health
SMART
MOBILITY/V2X/CAVBENEFIT: Signal Control And
Prioritization (TSP/EVP)
VIDEO / DATA
ANALYTICS
BENEFIT: Safety
Monitoring
and Alerts
6 SMART Signal - Intersection Prioritizing
► On regional routes of significance
► In Priority Development Area (PDA) or access to PDA + Downtown and Commercial Districts
► Presence of transit routes and connection to BART
► Presence of bicycle lanes
► Bicycle and pedestrian collisions
► Connection to Shared Mobility Hubs
► Traffic volume
Trafficware
Signal Firmware
Trafficware Signal
Controllers
Trafficware
ATMS Central
Software
McCain Signal
Firmware
McCain Signal
Controllers
Econolite Signal
Firmware
Econolite Signal
Controllers
Innovate 680
Signals
Multiple Vendor
Controllers
Econolite
Centracs Central
Software
Center
To
Center
Decision
Support System
Monitoring
Reports
Monitoring
ToolMcCain
QuicNet Central
Software
City A
City B
City C
CATS
I-680 Cities
Multiple Central
Software
PROJECT TEAM
Design &
Management
Team
Internal CCTA staff, AMG,
consultants/contractors
performing day-to-day
activities.
(bi-monthly meetings)
Core Advisory
Committee (CAG) Stakeholders
Technical Staff from CCTA ,
local cities, Contra Costa
County and transit
agencies
(Monthly meetings a
week prior to Stakeholder
meetings)
Traffic engineer and public
work staff from all
agencies, including Cities,
County, CHP , and Transit
agencies.
(Monthly meetings a week
after CAG meetings)
FUNDING PLAN
CITY OF HERCULES
San Pablo Ave Hercules Ave
San Pablo Ave Sycamore Ave
San Pablo Ave Market Dr
San Pablo Ave John Muir Pkwy
San Pablo Ave Victoria Cres E
CITY OF HERCULES
Hercules Amount
Total $567,597
Match (11.47%) $65,091
PROJECT SCHEDULE
Systems Engineering
Plan, Specifications, & Estimate
Construction
Systems Integration
Project Close Out
SPRING 2023 - SPRING 2024
SPRING 2024 - FALL 2025
FALL 2025 – FALL 2026
FALL 2026 – FALL 2027
FALL 2028