No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
1 H12-01-001 01-Arcata-1 1 Arcata 2 2 Humboldt County RURAL Various locations throughout the City.
Stripe high visibility crossings, install bike lanes and buffered bike lanes, replaceg paint with thermoplastic striping, and install signs.
$ 260,900 $ 234,810 SA-BikeSafety State 2 H12-01-002 01-Arcata-2 1 Arcata 2 2 Humboldt County RURAL Various locations throughout the City.
Install rectangular rapid flashing beacons (RRFBs), raised pedestrian crossing speed tables, bulb-outs, enhanced visibility crosswalks, and LED stop signs.
$ 385,600 $ 347,040 SA-PedCrossing State 3 H12-01-003 01-Arcata-3 1 Arcata 2 2 Humboldt County RURAL Various locations throughout the City. Install white and yellow reflective thermoplastic striping and retroreflective pavement marker. $ 131,900 $ 118,710 SA-Edgeline State 4 H12-01-004 01-Del Norte County-2 1 Del Norte County 2 2 Del Norte County RURAL Williams Drive from US 101 to the end of the County maintained road, a distance of approximately 650 feet.
Construct a multi-use path accessing the Williams Drive Emergency Shelter and Micro Village and Williams Drive Youth Opportunity Center.
$ 1,013,500 $ 350,000 SA-BikeSafety State 5 H12-01-005 01-Del Norte County-3 1 Del Norte County 2 2 Del Norte County RURAL Williams Drive from US 101 to the end of the County maintained road, a distance of approximately 650 feet.
Construct a multi-use path accessing the Williams Drive Emergency Shelter and Micro Village and Williams Drive Youth Opportunity Center.
$ 1,013,500 $ 91,260 SA-Edgeline State 6 H12-01-006 01-Del Norte County-4 1 Del Norte County 2 2 Del Norte County RURAL Del Norte County maintained road system. Upgrade guardra il on the County maintained road system. $ 1,111,100 $ 999,990 SA-Guardrail Federal 7 H12-01-007 01-Eureka-1 1 Eureka 2 2 Humboldt County RURAL Various locations along the proposed Bay to Zoo Trail alignment, specifically the 2200 block of Buhne Street, 2200 block of Russ Street, and the intersection of Dolbeer and Harris Streets.
Implement pedestrian enhancements such as flashing beacons and crosswalk improvements along the Bay to Zoo Trail
alignment at high traffic mid-block crossing and non-signalized intersection.
$ 433,500 $ 346,800 SA-PedCrossing State 8 H12-01-008 01-Eureka-2 1 Eureka 2 2 Humboldt County RURAL Six (6) signalized intersections.
Replace existing pedestal mounted signals with mast arm and overhead signals and implement leading pedestrian interval (LPI) at five locations, and install protected left turn and signal phasing at one location.
$ 983,400 $ 885,060 BCR State 9 H12-01-009 01-Fort Bragg-1 1 Fort Bragg 2 2 Mendocino County RURAL Willow St. between S Harold St. and Florence St., containing four (4) intersections and one (1) mid-block crossing.
Install a pedestrian crossing island, high visibility crosswalks, and ADA compliant sidewalk, curb & gutter, curb ramps, and bulb -
outs.
$ 397,200 $ 349,677 SA-PedCrossing State 10 H12-01-010 01-Humboldt County-1 1 Humboldt County 2 2 Humboldt County RURAL Three locations: intersection of Oak and F Streets in
unincorporated Eureka area, intersection of Kimtu Road and Country Club Drive in Willow Creek area, and school crossing for Loleta School on Loleta Drive.
Install pedestrian crossing enhancements. $ 388,800 $ 349,920 SA-PedCrossing State 11 H12-01-011 01-Humboldt County-2 1 Humboldt County 2 2 Humboldt Coun ty RURAL Various guardrails and bridges throughout Humboldt County . Repair, replace and upgrade guardrails and end treatments to current safety standards. $ 1,108,300 $ 997,470 SA-Guardrail Federal 12 H12-02-001 02-Trinity County-1 2 Trinity County 2 2 Trinity County RURAL Various locations throughout Trinity County. Install stripes utilizing weather resistant paint and optical elements to achieve retroreflectivity at night. $ 5,933,600 $ 5,340,240 BCR Federal 13 H12-03-001 03-Butte County-1 3 Butte County 1 3 Butte County BCAG Ten road sections: Keefer Rd, Garner Ln, Chico River Rd, Dayton Rd, Durham Dayton Hwy, Ord Ferry Rd, Richvale Hwy, W. Biggs Gridley Rd, E. Gridley Rd, and Larkin Rd.
Upgrade existing 4 inch centerlines and edgelines to 6 inch thermoplastic striping. $ 1,359,900 $ 1,223,910 BCR Federal 14 H12-03-002 03-Butte County-2 3 Butte County 1 3 Butte County BCAG Various road sections throughout Butte County. Peform road safety si gning audit (RSSA) and modify signage. $ 2,606,900 $ 2,346,210 BCR Federal 15 H12-03-003 03-Butte County-3 3 Butte County 1 3 Butte County BCAG Various throughout Butte County: 10th St (at Feather Ave), Pacific Heights Rd (Oroville Wildlife Area), Pacific Heights Rd (N of Georgia Pacific Way), B St (E of Biggs), Richvale Hwy (E of Richvale), Lower Wyandotte Rd (between Country Oaks Dr).
Upgrade Metal Beam Guardrails (MBGR) to Midwest Guardrail System (MGS). $ 500,000 $ 450,000 SA-Guardrail State 16 H12-03-004 03-Butte County-4 3 Butte County 1 3 Butte County BCAG Various locations within designated road segments throughout Butte County: Skyway (3), Columbine Rd, Steiffer Rd, Colter Way, Neal Road.
Add high friction surface treatment (HFST). $ 600,000 $ 540,000 BCR State 17 H12-03-005 03-Chico-1 3 Chico 1 3 Butte County BCAG Various intersections throughout the City of Chico. Install leading pedestrian interval (LPI) and Audible Pedestrian System (APS). $ 388,700 $ 349,830 SA-PedCrossing State 18 H12-03-006 03-Davis-1 3 Davis 3 4 Yolo County SACOG On Lake Blvd from Russell Blvd to Arlington Blvd. Install buffered bike lanes. $ 267,200 $ 240,480 SA-BikeSafety State 19 H12-03-007 03-Davis-2 3 Davis 3 4 Yolo County SACOG Three locations throughout the city. Install rectangular rapid flashing Beacons; Install and upgrade high visibility pedestrian crossing markings. $ 341,900 $ 307,710 SA-PedCrossing State 20 H12-03-008 03-El Dorado County-1 3 El Dorado County 5 1, 4 El Dorado County SACOG Multiple locations along Lotus Road. Replace out of compliance guardrail with new guardrail. $ 1,111,100 $ 999,990 SA-Guardrail State 21 H12-03-009 03-El Dorado County-2 3 El Dorado County 4 5 El Dorado County SACOG Ponderosa Road from Foxwood Lane to Mineshaft Lane. Add a Class II Bike facility. $ 812,000 $ 348,000 SA-BikeSafety State 22 H12-03-010 03-El Dorado County-3 3 El Dorado County 4 5 El Dorado County SACOG Ponderosa Road from Foxwood Lane to Mineshaft Lane. Add a pedestrian sidewalk facility. $ 787,000 $ 349,650 SA-PedCrossing State 23 H12-03-011 03-Elk Grove-1 3 Elk Grove 8 10 Sacramento County SACOG Auberry Dr at Monterey Trail High School, Bellaterra Dr at Valgrande Way, Elk Grove Florin Rd at Park Trail Dr, Elk Grove Florin Rd at Tralee Wy, Kyler Rd at Kammerer Park, Soaring Oaks Dr at Carrcroft Dr, and Vicino Dr at Laguna Creek High School.
Install rectangular rapid flashing beacons (RRFBs) at
uncontrolled crossings. $ 346,100 $ 311,490 SA-PedCrossing State 24 H12-03-012 03-Glenn County-1 3 Glenn County 1 3 Glenn County RURAL County Road 60 from I-5 to SR 162. Install centerline, edgelines and rumble strips, and replace striping. $ 361,800 $ 325,620 SA-Edgeline State 25 H12-03-013 03-Nevada County-1 3 Nevada County 1 1 Nevada County RURAL Fourteen (14) roadway curves throughout Nevada County. Apply hig h friction surface treatment (HFST). $ 1,607,000 $ 1,446,300 BCR Federal 26 H12-03-014 03-Placer County-1 3 Placer County 1, 6 1, 3, 5 Placer County SACOG Cavitt Stallman Road in Granite Bay, Applegate Road and Crother Road in Applegate, Dry Creek Road in Auburn, Giesendorfer Road in Weimar, Magra Road in Colfax and portions of McCourtney Road north of Lincoln.
Install edgeline striping. $ 344,400 $ 309,960 SA-Edgeline State 27 H12-03-015 03-Placer County-2 3 Placer County 1, 6 3, 5 Placer County SACOG Auburn Folsom Road and Horseshoe Bar Road in Loomis.
Portions of Wise/West Wise Road and Nicolaus Road in Lincoln.
All of Lincoln-Sheridan Blvd in Lincoln. Mt. Vernon Road in Auburn. Taylor Road in Penryn/Loomis.
Install "Pass-3 Ft. Min" signs on various roadways; replace and install new "Bike Lane" signage and markings on Taylor, Auburn Folsom Road and Lincoln-Sheridan Blvd; and add conflict markings to Taylor Road.
$ 382,300 $ 344,070 SA-BikeSafety State Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 1 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 28 H12-03-016 03-Placer County-3 3 Placer County 4 1 Placer County SACOG Auburn Folsom Road, Cabin Creek Road, Caperton Court, Indian Hill Road, Rippey Road, and Tahoe Park Heights Drive, located in Granite Bay, Loomis, Penryn, Newcastle, Dutch Flat, Truckee and Tahoe City.
Replace approximately 4,300 lineal feet of existing guardrail with new Midwest Guardrail System (MGS) guardrails and terminals. $ 1,107,700 $ 996,930 SA-Guardrail Federal 29 H12-03-017 03-Placer County-4 3 Placer County 1, 4 1, 6 Placer County SACOG H Street in Sheridan, Foresthill Road in the town of Foresthill, Auburn Folsom Road in Granite Bay north of Douglas Blvd and Wellington Way at Granite Bay High School in Granite Bay.
Install continental crosswalks in Sheridan on H Street, continental crosswalk, rectangular rapid flashing beacons (RRFBs) and one dynamic flashing speed limit sign in Foresthill and convert existing HAWK signal to pedestrian signal in Granite Bay.
$ 379,800 $ 341,820 SA-PedCrossing State 30 H12-03-018 03-Placer County-5 3 Placer County 1, 6 3, 5 Placer County SACOG Several locations in western Placer County including Lincoln, Sheridan, Auburn and Newcastle. Install high friction surface treatment (HFST) along curves. $ 1,841,100 $ 1,656,990 BCR Federal 31 H12-03-019 03-Placer County-7 3 Placer County 1, 6 1, 3, 5 Placer County SACOG 21 roadways in Placer County. Perform roadway safety sign audit and sign upgrades, including yellow warning signs and regulatory speed limit signs. $ 1,110,900 $ 999,810 BCR Federal 32 H12-03-020 03-Rancho Cordova-1 3 Rancho Cordova 6 7 Sacramento County SACOG 51 signals on the following corridors: Folsom Blvd, Zinfandel Dr, Sunrise Blvd, Bradshaw Rd, Old Placerville Rd, Douglas Rd, White Rock Rd, Rancho Cordova Pkwy, Data Dr, and Mather Field Rd.
Install signal hardware improvements including upgrading vehicle signal lenses from 8 inch to 12 inch and retroreflective border on backplates.
$ 1,142,100 $ 975,690 BCR State 33 H12-03-021 03-Sacramento-1 3 Sacramento 8 6, 10 Sacramento County SACOG Various signalized intersections throughout the City of Sacramento.
Install new traffic signal heads and modify existing signal heads to include retro-reflective tape. $ 1,005,500 $ 904,950 BCR State 34 H12-03-022 03-Sacramento County-1 3 Sacramento County 8 6 Sacramento County SACOG Intersection of Elkhorn Boulevard and 28th St. Insta ll traffic signal. $ 1,666,000 $ 1,499,400 BCR Federal 35 H12-03-023 03-Sacramento County-2 3 Sacramento County 8 10 Sacramento County SACOG Florin Rd at Power Inn Rd; Gerber Rd at Power Inn Rd; 47th Ave at MLK Jr Blvd; Lindale Dr at Stockton Blvd; 65th St at Sky Pkwy; French Rd at Gerber Rd; and 65th St Expressway at 53rd Ave.
Implement leading pedestrian interval (LPI) at 6 signals; install one new traffic signal with LPI at 65th St at 53rd Ave. $ 1,170,000 $ 1,053,000 BCR State 36 H12-03-024 03-Truckee-1 3 Truckee 1, 4 1 Nevada County RURAL Various locations throughout the Town of Truckee. Upgrade guardrails. $ 932,500 $ 839,250 SA-Guardrail State 37 H12-03-025 03-Woodland-1 3 Woodland 3 4 Yolo County SACOG Intersection of West Street and Beamer Street. Upgrade signal hardware, improve signal timing, and install left- turn lanes and ADA ramps. $ 903,500 $ 451,750 BCR State 38 H12-03-026 03-Woodland-2 3 Woodland 3 4 Yolo County SACOG Pedestrian crossings at Freeman Elementary School, Tafoya Elementary School, Dignity Health Complex, and at the multi-use paths at Farmers Central and the Heritage Parkway.
Install rectangular rapid flashing beacons (RRFBs) and AC Powered speed feedback signs. $ 388,800 $ 349,920 SA-PedCrossing State 39 H12-03-027 03-Yuba City-1 3 Yuba City 4 3 Sutter County SACOG The intersection of Market Street and Bird Street. Install pedestrian hy brid beacons. $ 230,500 $ 207,450 SA-PedCrossing State 40 H12-03-028 03-Yuba County-1 3 Yuba County 4 3 Yuba County SACOG Forty Mile Road between Rosser Road and the north entrance to the Hard Rock Hotel & Casino.
Construct shared-use path, install segment lighting, K-Rail barrier, traffic signs, and pavement markings. $ 6,495,000 $ 5,845,500 BCR Federal 41 H12-04-001 04-Clayton-1 4 Clayton 7 15 Contra Costa
County MTC Thirteen (13) signalized intersections. Upgrade signal heads with retroreflective backplates. $ 50,700 $ 45,630 BCR State 42 H12-04-002 04-Concord-1 4 Concord 7 15 Contra Costa
County MTC Various locations. Install / upgrade signs with new fluorescent sheeting. $ 7,782,500 $ 7,00 4,250 BCR Federal 43 H12-04-003 04-Concord-2 4 Concord 7 15 Contra Costa
County MTC Olivera Road & Grant Street-Northwood Drive. Modify existing traffic signal system to eliminate permissive left- turn operations and improve intersection safety lighting. $ 932,500 $ 839,250 BCR State 44 H12-04-004 04-Concord-3 4 Concord 7 15 Contra Costa
County MTC Various locations.
Install traffic signal backplates with yellow retroreflective border, install pedestrian countdown signal heads, accessible push button and associated ADA curb ramp upgrades and implement leading pedestrian interval (LPI).
$ 1,117,000 $ 1,005,300 BCR State 45 H12-04-005 04-Contra Costa County-1 4 Contra Costa County 7 15 Contra Costa County MTC
Various locations on arterials, collectors, and local roads within the Bay Point, Concord, and Martinez areas of unincorporated Contra Costa County.
Replace sub-standard Metal Beam Guardrails (MBGR) with
Midwest Guardrail System (MGS) and end treatments. $ 1,787,400 $ 1,000,000 SA-Guardrail State 46 H12-04-006 04-Contra Costa County-2 4 Contra Costa County 9 16 Contra Costa County MTC Treat Boulevard in the City of Walnut Creek and unincorporated Contra Costa Centre area, from N Main St to Jones Rd.
Install Class IV bikeways between N Main St and Jones Rd, install a shared use path between Buskirk Ave and Oak Rd, eliminate free right turns, and modify traffic signals and pedestrian refuge islands.
$ 5,106,300 $ 350,000 SA-BikeSafety State 47 H12-04-007 04-Contra Costa County-3 4 Contra Costa County 9 15, 16 Contra Costa County MTC
The intersections of Danville Blvd & S outh Ave in Alamo and Center Ave & Deodar Dr in Pacheco, unincorporated Contra Costa County.
Install pedestrian crossing improvements at two intersections such as rectangular rapid flashing beacons (RRFBs), curb ramps, continental crosswalk striping, and other safety features. $ 629,400 $ 350,000 SA-PedCrossing State 48 H12-04-008 04-Contra Costa County-4 4 Contra Costa County 9 16 Contra Costa County MTC Camino Tassajara from Finley Road to Windemere Parkway. Install centerline rumble strips, install segment and intersection lighting, and upgrade guardrails. $ 1,783,100 $ 1,604,790 BCR Federal 49 H12-04-009 04-Contra Costa County-5 4 Contra Costa County 7, 9 11, 14, 15, 16 Contra Costa County MTC At various locations along curves. Install speed feedback signs and curve warning signs. $ 2,402,300 $ 2,162,070 BCR Federal 50 H12-04-010 04-Dixon-1 4 Dixon 3 11 Solano County MTC Nine pedestrian crossings: one at N 1st Street and E B Street, all four legs at Watson Ranch Way and Pitt School Road, and all four legs at Watson Ranch Way and N Lincoln Street.
Install rectangular rapid flashing beacons (RRFBs) and other standard crossing treatments including signing, striping, and curb enhancements.
$ 177,100 $ 159,390 SA-PedCrossing State 51 H12-04-011 04-Dixon-2 4 Dixon 3 11 Solano County MTC N Adams Street between W A Street and N 1st Street/SR 113. Install buffered bike lanes, refresh bike lane striping and existing channelization, and add green conflict zone markings. $ 160,200 $ 144,180 SA-BikeSafety State 2 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 52 H12-04-012 04-Fairfield-1 4 Fairfield 3 11 Solano County MTC Four pedestrian crossings: Linear Park Trail & Beck Avenue, Linear Park Trail & Fairfield Avenue, Linear Park Trail & Union Avenue, and Mankas Boulevard midblock crossing near Mankas Neighborhood Park.
Install rectangular rapid flashing beacons (RRFBs) and other standard crossing treatments including signing, striping, and curb enhancements.
$ 449,300 $ 342,810 SA-PedCrossing State 53 H12-04-013 04-Fairfield-2 4 Fairfield 3 11 Solano County MTC Texas Street/N Texas Street from Union Avenue to E Travis Boulevard. Install new bike lanes and re-stripe existing channelization. $ 283,400 $ 255, 060 SA-BikeSafety State 54 H12-04-014 04-City of Gilroy-1 4 Gilroy 17 29 Santa Clara County MTC On the west side of Church Street, just north of its intersection with 1st Street.
Construct sidewalk and curb & gutter for a sidewalk gap closure, as well as two new driveway approaches to become ADA
compliant.
$ 157,900 $ 142,110 SA-PedCrossing State 55 H12-04-015 04-City of Gilroy-2 4 Gilroy 17 29 Santa Clara County MTC On the southeastern edge of the intersection of Santa Teresa Boulevard and Day Road East, diagonally across the intersection from Christopher High School.
Upgrade a guardrail and construct an ADA compliant access to the Lions Creek Trail along Santa Teresa Boulevard. $ 959,000 $ 785,375 SA-Guardrail State 56 H12-04-016 04-Hayward-1 4 Hayward 10 20 Alameda County MTC The intersection of Industrial Parkway West/Industrial Parkway Southwest/Ruus Road.
Install left turn phase traffic signals with pole and mast arm, convert pedestal mounted traffic signal to mast arm traffic signal, install raised pavement markings & striping through skewed intersection, and install pedestrian signals and APS pushbuttons. $ 647,200 $ 537,176 BCR State 57 H12-04-017 04-Hayward-2 4 Hayward 10 20 Alameda County MTC Various locations. Improve traffic signal hardware, install pedestrian countdown signal heads, and improve intersection lighting. $ 1,755,800 $ 1,580,220 BCR Federal 58 H12-04-018 04-Hayward-3 4 Hayward 10 20 Alameda County MTC Ruus Rd between Folsom and Industrial, Amador St and Cypress Avenue from Elmhurst to Harder, and Soto Rd near Jackson St.
Install concrete islands, signage, and striping to designate and protect a Class IV separated bike lane on Ruus Rd. Install signage and striping changes to designate Class II Bike Lanes at other locations.
$ 504,000 $ 346,193 SA-BikeSafety State 59 H12-04-019 04-Hayward-4 4 Hayward 10 20 Alameda County MTC Calaroga Ave/Eden Greenway; D St /5th St; Santa Clara St/El Dorado Ave; Santa Clara St/Ocie Way; Patrick Ave/St Bede Ln; Patrick Ave /Mid-Block Crossing at St Bede Catholic Church.
Install rectangular rapid flashing beacons (RRFBs), curb extensions, and pedestrian refuge islands. $ 579,100 $ 349,776 SA-PedCrossing State 60 H12-04-020 04-Hercules-H1 4 Hercules 9 15 Contra Costa County MTC Sycamore Avenue Corridor under I-80 and the BNSF railroad overcrossing.
Install a 10-ft multipurpose pathway and Class II bicycle lanes, improving safety and connectivity. $ 1,415,600 $ 350,000 SA-BikeSafety State 61 H12-04-021 04-Livermore-1 4 Livermore 7 16 Alameda County MTC Intersections of First St and Southfront Rd, E Stanley Blvd and Murrieta Blvd, Railroad Ave and S P St, First St and Maple St, Portola Ave and N L St , Northfront Road and North Vasco Road, Fenton St and E Stanley Blvd, and East Ave and Charlotte Way.
Improve pedestrian safety: install flashing beacons as advance warning, install advance stop bar before crosswalk (bicycle box), and modify signal phasing to implement a leading pedestrian interval (LPI).
$ 413,200 $ 371,880 BCR State 62 H12-04-022 04-Livermore-2 4 Livermore 7 16 Alameda County MTC Intersections of First St and Portola Ave, First St and Scott St, Jensen St and East Ave, Maple St and 5th St , Charlotte Way and Marcella St, and Charlotte Way and Arlene Way.
Install/upgrade larger or additional stop signs or other intersection warning/regulatory signs, install flashing beacons as advance warning and install rectangular rapid flashing beacons (RRFBs).
$ 452,400 $ 407,160 BCR State 63 H12-04-023 04-Livermore-3 4 Livermore 7 16 Alameda County MTC First St, Murrieta Blvd, Concannon Blvd, Las Positas Road, N Livermore Ave, S. Vasco Rd, W Jack London Blvd, Portola Ave, E Stanley Blvd and Patterson Pass Rd.
Install dynamic/variable speed warning signs. $ 1,248,600 $ 1,123,740 BCR State 64 H12-04-024 04-Livermore-4 4 Livermore 7 16 Alameda County MTC College Ave and S Livermore Ave, Hansen Rd and Arroyo Rd, East Ave and Mitra St, Springtown Blvd and Rhododendron Dr.
Improve crossing signage and striping, and install rectangular rapid flashing beacons (RRFBs). $ 380,600 $ 342,540 SA-PedCrossing State 65 H12-04-025 04-Marin County-2 4 Marin County 2 12 Marin County MTC Irving Drive and Butterfield Road (T-intersection) in unincorporated San Anselmo, Marin County. Improve pedestrian crossing. $ 349,500 $ 314,550 SA-PedCrossing State 66 H12-04-026 04-Marin County-3 4 Marin County 2 12 Marin County MTC North San Pedro Road in San Rafael, Pinehill Road in Mill Valley, and variable location for portable trailer.
Install radar feedback signs and deploy portable radar feedback trailer in various locations. $ 232,200 $ 208,980 BCR State 67 H12-04-027 04-Mill Valley-1 4 Mill Valley 2 12 Marin County MTC Various locations.
Install pedestrian crossing; install sidewalk; install/upgrade pedestrian crossing; install rectangular rapid flashing beacons (RRFBs).
$ 388,900 $ 350,000 SA-PedCrossing State 68 H12-04-028 04-Milpitas-1a 4 Milpitas 10 24 Santa Clara County MTC All city owned and maintained traffic signals (72); three (3) unsignalized intersections; and N McCarthy Blvd curve 500 feet south of the city boundary between Milpitas and Fremont.
Install retroreflective backplates and leading pedestrian interval (LPI), improve visibility with signage, daylighting and beacons, and improve horizontal curve.
$ 2,293,700 $ 2,064,330 BCR Federal 69 H12-04-029 04-Town of Moraga-1 4 Moraga 7 16 Contra Costa County
MTC
The primary corridors connecting Moraga with adjacent
communities and two non-signalized intersections: Moraga Wy, Canyon Rd, Rheem Blvd, St. Mary’s Rd, Moraga Rd at Lucas Dr (intersection), and Moraga Way at Moraga Valley Ln (intersection).
Apply high friction surface treatment (HFST), install intersection lighting, install/upgrade signs with new fluorescent sheeting (regulatory or warning), and install delineators, reflectors and/or object markers.
$ 1,048,700 $ 943,830 BCR State 70 H12-04-030 04-Napa-1a 4 Napa 3 4 Napa County MTC Sixteen (16) signalized intersections.
Provide one protected left-turn phase, install one pedestrian countdown signal head, and modify signal phasing for fourteen intersections to implement a leading pedestrian interval (LPI). $ 424,000 $ 381,600 BCR State 71 H12-04-031 04-Napa-2 4 Napa 3 4 Napa County MTC Non-signalized intersection: California Boulevard and Pueblo Avenue. Install upgraded stop signs and intersection pavement markings. $ 51,100 $ 45,990 B CR State 72 H12-04-032 04-Napa County-1 4 Napa County 3 4 Napa County MTC 24 sections spread along Howell Mountain Rd (5), White Cottage Rd (2), Oakville Cross Rd (6), Silverado Trail (1), Deer Park Rd (1), Oak Knoll Ave (6), and Larkmead Ln (3).
Upgrade guardrails and end treatments. $ 1,111,100 $ 999,990 SA-Guardrail Federal 3 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 73 H12-04-033 04-Oakland-1 4 Oakland 9 18, 14 Alameda County MTC 4 intersections in Oakland neighborhoods: MLK Jr. Way & W Grand Ave; Orange St & Perkins St; Park Blvd & Leimert Blvd; and Fruitvale Ave & International Blvd.
Add a protected left-turn phase, add intersection mast-arms, install raised median/pedestrian refuge islands, and
install/upgrade pedestrian crossings.
$ 2,043,800 $ 1,839,420 BCR Federal 74 H12-04-034 04-Oakland-2a 4 Oakland 7 18 Alameda County MTC 13 non-signalized intersections at arterial and collector streets throughout Oakland.
Install rectangular rapid flashing beacons (RRFBs),
install/upgrade pedestrian crossings at uncontrolled locations, and install raised medians/refuge islands.
$ 1,220,400 $ 1,098,360 BCR State 75 H12-04-035 04-Orinda-01 4 Orinda 7 16 Contra Costa
County MTC
Five (5) stop-controlled intersections: Moraga Way and Orchard Rd; Moraga Way and Stein Way; Crestview Dr. and Richard Court and Valley View Dr; Miner Rd and Poppy Lane; and Lost Valley Dr and Valley View Dr and Don Gabriel Way.
Install flashing beacons at stop sign and flashing beacons as advance warning. $ 130,500 $ 101,250 BCR State 76 H12-04-036 04-Orinda-02 4 Orinda 7 16 Contra Costa
County MTC Sections of Camino Pablo; Brookwood Rd; Crestview Dr; Lost Valley Dr, Miner Rd; and Orinda Wy. Install speed warning signs, chevron signs, and rumble strips. $ 174,000 $ 135,000 BCR State 77 H12-04-037 04-Orinda-03 4 Orinda 7 16 Contra Costa
County MTC
Brookwood Rd from Moraga Wy to Spring Ct; Lost Valley Dr from Don Gabriel Wy; Orinda Wy from El Toyonal to Santa Maria Wy; and Valley View Dr from Crestview Dr to Don Gabriel Wy.
Install pedestrian crossing with enhanced safety features and rectangular rapid flashing beacons (RRFBs). $ 505,000 $ 391,680 BCR State 78 H12-04-038 04-Orinda-04 4 Orinda 7 16 Contra Costa
County MTC All publiclly maintained streets within the City of Orinda, excluding those within the State right-of-way.
Assess and document all signs and pavement markers within the City of Orinda, excluding the limits within the State right-of-way. $ 611,900 $ 474,750 BCR State 79 H12-04-039 04-Petaluma-1 4 Petaluma 2 12 Sonoma County MTC 35 signalized intersections throughout the City of Petaluma.
Replace signal heads and install retroreflective borders to backplates, add mast arms and signal heads at intersections, and update signal timing to include leading pedestrian intervals (LPI).
$ 1,237,400 $ 1,113,660 BCR State 80 H12-04-040 04-Petaluma-2 4 Petaluma 2 12 Sonoma County MTC Various locations along Sonoma Mountain Parkway and Ely Road North.
Install rectangular rapid flashing beacons (RRFBs) and
pedestrian refuge islands. $ 387,800 $ 349,020 SA-PedCrossing State 81 H12-04-041 04-Pittsburg-1 4 Pittsburg 7 11 Contra Costa County MTC Arterial Roadway of Harbor Street from Buchanan Road to East 3rd Street.
Improve signal hardware (cabinets, signal heads, signal pole, loops, backplate, controllers, backup battery systems, and camera), install light roadway segment improvements, and upgrade pedestrian crossing with enhanced safety features. $ 2,612,700 $ 2,246,922 BCR Federal 82 H12-04-042 04-San Bruno-1 4 San Bruno 13 21 San Mateo County MTC Three unsignalized intersections along the San Bruno Avenue West corridor, between El Camino Real and Seventh Avenue.
Install rectangular rapid flashing beacons (RRFBs) at two intersections; install crosswalk striping/signage improvements at two intersections.
$ 349,100 $ 314,190 SA-PedCrossing State 83 H12-04-043 04-San Francisco-1 4 San Francisco 11 17, 19 San Francisco County MTC Various locations.
Install new and replace existing signs (e.g., No Turn on Red, Speed Limit near schools, “Slow—School Xing”, and Yield/Ped Signs) to feature advanced high-visibility fluorescent sheeting. $ 4,412,400 $ 3,971,160 BCR Federal 84 H12-04-044 04-San Jose-1 4 San Jose 10, 15 24, 25, 26, 28 Santa Clara County MTC 52 signalized intersections along the corridors of Capitol Ave, First Street, Curtner, Camden Ave, Branham Ln, Barack Obama Bl, Moorpark Ave, Park Ave, McLaughlin Ave, Quimby Rd, and Tully Rd.
Upgrade 8 inch diameter traffic signal heads to 12 inch heads, apply retroreflective borders on traffic signal backplates, and install accessible pedestrian signal hardware.
$ 566,300 $ 509,670 BCR State 85 H12-04-045 04-San Leandro-1 4 San Leandro 9 18 Alameda County MTC (1) Manor Blvd/Crosby St, (2) Manor Blvd/Thoits St, (3) Dutton Ave/Arbor Dr, (4) Farnsworth St/Devonshire Ave, (5) 150th Ave/Lark St, (6) E. 14th St/Lorraine Dr, and (7) Farnsworth St/Chapel Ave.
Install rectangular rapid flashing beacons (RRFBs), pedestrian hybrid beacons, and crosswalk enhancements. $ 2,038,400 $ 1,834,560 BCR Federal 86 H12-04-046 04-San Mateo County-1 4 San Mateo County 11, 13 19, 21, 23 San Mateo County MTC Various locations. Construct 11 guardrails and 22 end treatments. $ 1,077,500 $ 969,750 SA-Guardrail Federal 87 H12-04-047 04-San Mateo County-2 4 San Mateo County 11, 13 19, 21, 23 San Mateo County MTC Various locations. Construct edgeline for 1 6.5 miles of roadway. $ 389,800 $ 350,000 SA-Edgeline State 88 H12-04-048 04-San Rafael-1 4 San Rafael 2 12 Marin County MTC The Lincoln Avenue corridor between Second Street and Paloma Avenue, including eight (8) intersections.
Install protected left turn lane striping and signal phases, add intersection safety improvements with traffic signal upgrades, intersection lighting, rectangular rapid flashing beacons (RRFBs), and pedestrian crossing upgrades.
$ 2,839,900 $ 2,555,910 BCR Federal 89 H12-04-049 04-Sebastopol-1 4 Sebastopol 2 12 Sonoma County MTC Intersection of Covert Lane and Zimpher Drive.
Install pedestrian-activated circular LED rapid flashing beacons, perimeter lighted pedestrian crossing signs, pedestrian pushbuttons, curb extensions, ADA ramps and refu
ge island, and
$ 388,400 $ 349,560 SA-PedCrossing State 90 H12-04-050 04-Solano County-1 4 Solano County 3 11 Solano County MTC Various unsignalized intersections throughout the County.
Install additional signs or upgrade existing signs (intersection warning/regulatory signs, flashing beacons, and other advance warning signals).
$ 525,500 $ 472,950 BCR State 91 H12-04-051 04-Solano County-2 4 Solano County 3 11 Solano County MTC Multiple Rural Roads: 1) Pleasants Valley Rd 2) Suisun Valley Rd 3) Mankas Corner Rd 4) Putah Creek Rd 2 segments 5) Rockville Rd 6) Lopes Rd 7) Sievers Rd 8) Meridian Rd 9) Midway Rd 10) Pedrick Rd 2 segments 11) Cantelow Rd 12) and Other Roads.
Install/upgrade regulatory and warning signs with fluorescent sheeting, install chevron signs on curves, and install delineators, reflectors and/or object markers.
$ 1,313,600 $ 1,182,240 BCR Federal 92 H12-04-052 04-Solano County-3 4 Solano County 3 11 Solano County MTC Multiple rural road corridors: (1) Lopes Road, (2) Mankas Corner Road, and (3) Pleasants Valley Road and (4) other roads. Install guardrails at horizontal curves and spot locations. $ 580,600 $ 522,540 BCR St ate 93 H12-04-053 04-Solano County-4 4 Solano County 3 11 Solano County MTC Various roadway segments. Install lighting and dynamic/variable s peed warning signs. $ 947,800 $ 853,020 BCR Federal 94 H12-04-054 04-Solano County-5 4 Solano County 3 11 Solano County MTC Tremont Road from Sparling Lane to Old Davis Road. Widen existing graded dirt shoulders, pave and stripe bike lanes. $ 1,499,200 $ 349,934 SA-BikeSafety S tate 4 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 95 H12-04-055 04-Suisun City-01 4 Suisun City 3 11 Solano County MTC Non-signalized intersection on Pintail Drive at Crane Drive; Suisun City Fire Station, 621 Pintail Drive, between Cackling Drive and East Wigeon Way.
Install rectangular rapid flashing beacons (RRFBs), curb extensions, ADA ramps, warning signs and high visibility crosswalk; Replace and upgrade outdated emergency warning devices and install new advance warning beacons.
$ 388,800 $ 349,920 SA-PedCrossing State 96 H12-04-056 04-Vac aville-1 4 Vacaville 3 1 1 Solano County MTC Orchard Ave from Walnut Ave to Peach Tree Ave, the
intersections of Christine Dr and Oak Hollow Ave, Brown St and Bennett Hill Dr, Markham Ave and Alpine St, and Markham Ave and Meadows Dr.
Install pedestrian crossing enhancements such as radar
feedback signs and rectangular rapid flashing beacons (RRFBs). $ 388,400 $ 349,560 SA-PedCrossing State 97 H12-04-057 04-Vallejo-1 4 Vallejo 3 11 Solano County MTC Major collector streets including Admiral Callaghan Lane, Ascot Parkway, Benicia Road, Borges Lane, Camino Alto, Corcoran Avenue, Florida Street, Glen Cove Parkway, Nebraska Street, and Whitney Avenue.
Install edgelines. $ 270,500 $ 243,450 SA-Edgeline State 98 H12-04-058 04-Walnut Creek-1 4 Walnut Creek 7 16 Contra Costa County MTC Signalized intersections along Ygnacio Valley Road at the Walnut Boulevard, Via Monte Drive, Wimbledon Road, and Wiget Lane. Add protected-left-turn phasing. $ 2,134,400 $ 1,920,960 BCR Federal 99 H12-04-059 04-Windsor-1 4 Windsor 2 2 Sonoma County MTC Three locations: Arata Lane at Old Redwood Highway; Old Redwood Highway at U.S. 101 underpass; and Old Redwood
Highway and Pool Creek.
Replace damaged guardrails. $ 217,900 $ 196,110 SA-Guardrail State 100 H12-05-001 05-Arroyo Grande-1 5 Arroyo Grande 17 30 San Luis Obispo County SLOCOG Locations along E. Branch east of Mason Street to Le Point Terrace and Huasna Road at Rosewood Lane near Strother Park.
Improve pedestrian access to schools and parks by constructing crosswalks with bulb-outs, rectangular rapid flashing beacons (RRFBs), signage and island refuge. Add bulb-outs at E. Branch. $ 627,600 $ 340,560 SA-PedCrossing State 101 H12-05-002 05-Carpinteria-1 5 Carpinteria 21 37 Santa Barbara County SBCAG Carpinteria High School crosswalk. Install a pedestrian hybrid beacon. $ 380,300 $ 3 42,270 SA-PedCrossing State 102 H12-05-003 05-El Paso De Robles-01 5 El Paso De Robles 17 30 San Luis Obispo County SLOCOG
The intersections of Montebello Oaks Dr & Union Rd, 21st & Spring, 17th & Spring and Nickerson Dr at Centennial Trail crossing.
Install rectangular rapid flashing beacons (RRFBs) at crossings. $ 311,700 $ 280,530 SA -PedCrossing State 103 H12-05-004 05-El Paso De Robles-02 5 El Paso De Robles 17 30 San Luis Obispo County SLOCOG The intersection of Creston & Golden Hill. Modify/upgr ade signal along with signage and striping. $ 200 ,000 $ 100,000 BCR State 104 H12-05-005 05-San Juan Bautista-1 5 San Juan Bautista 14 29 San Benito County AMBAG Along 2nd Street from Muckelemi St. to about 100 feet beyond the intersection at Washington St.
Install one and remove one pedestrian crossing, enhance visibility at existing crossings with pavement markings and ped yield signs, install curb ramps, ADA tactile pads, and painted curb extensions and fill in gaps in the sidewalk network $ 514,100 $ 349,588 SA-PedCrossing State 105 H12-05-006 05-San Luis Obispo County-1 5 San Luis Obispo County 17 35 San Luis Obispo
County SLOCOG Vineyard Drive from Bennett Way to Main Street.
Install sidewalk, signal optimization, signing & striping improvement including green bike lane and intersection lane extension markings.
$ 908,400 $ 817,560 BCR State 106 H12-05-007 05-San Luis Obispo County-3 5 San Luis Obispo County 17 35 San Luis Obispo
County SLOCOG
Cross Canyon Road (N of Vineyard Canyon Road), Ontario Road (NW Corner at San Luis Bay Dr), Cave Landing Road, Lopez Drive (E of Huasna Road), and South Bay Boulevard (At Yama ln).
Upgrade 1960 feet of existing guardrail; install an additional 200 feet of MBGR at the South Bay Blvd site. $ 831,700 $ 748,530 SA-Guardrail State 107 H12-05-008 05-Santa Barbara-1 5 Santa Barbara 19 37 Santa Barbara County SBCAG
Three uncontrolled crossing locations: La Colina Rd at Hope Elementary, Hope Ave at Monte Vista Elementary, and Hope Ave At Pueblo Ave.
Install curb extensions, rectangular rapid flashing beacons (RRFBs), lighting, and markings. $ 388,800 $ 349,920 SA-PedCrossing State 108 H12-05-009 05-Santa Barbara-2 5 Santa Barbara 19 37 Santa Barbara County SBCAG Cota Street from Milpas Street to Santa Barbara Street. Install a doweled concrete curb to provide a continuous physical separation between cyclists and motorists. $ 388,800 $ 349,920 SA-BikeSafety State 109 H12-05-010 05-Santa Barbara-3a 5 Santa Barbara 19 37 Santa Barbara County SBCAG Cliff Drive between Mira Mesa Dr and Loma Alta Dr. Install lighting. $ 1,050,600 $ 945, 540 BCR State 110 H12-05-011 05-Santa Barbara-4a 5 Santa Barbara 19 37 Santa Barbara County SBCAG Various traffic signal locations. Install improved traffic signal hardware, intersection lighting, and install leading pedestrian intervals (LPIs). $ 4,134,700 $ 3,721,230 BCR Federal 111 H12-05-012 05-Santa Barbara-5a 5 Santa Barbara 19 37 Santa Barbara County SBCAG
Four (4) non-signalized intersections: Calle Cesar Chavez at Yanonali, Garden & Cota, Milpas Roundabout, and Yanonali at Helena.
Implement pedestrian crossing improvements, including
intersection lighting, rectangular rapid flashing beacons (RRFBs), and curb extensions.
$ 2,361,200 $ 2,125,080 BCR Federal 112 H12-05-013 05-Santa Barbara-6 5 Santa Barbara 19 37 Santa Barbara County SBCAG Eight (8) signalized intersections along Milpas Street. Install reflective backplates and poles. $ 430,6 00 $ 387,540 BCR State 113 H12-05-014 05-Santa Barbara County-1 5 Santa Barbara County 21 37 Santa Barbara County SBCAG
Various locations: Ray Rd, Brown Rd, Dominion Rd ,Palmer Rd, Foxen Canyon Rd, Santa Rosa Rd, Calzada Av, Central Av, and Glen Annie Rd.
Install edgelines. $ 385,000 $ 346,500 SA-Edgeline State 114 H12-05-015 05-Santa Barbara County-2 5 Santa Barbara County 21 37 Santa Barbara County SBCAG
Locations include 1: Brown Rd; 2: Black Rd; 3: Lompoc Casmilia Rd; 4: Harris Grade Rd; 5/6: Harris Grade Rd; 7: Santos Rd; 8:
Avenue of Flags Rd; 9: Ladan Dr; 10: Sagunto St; 11: Paradise Rd; 12-14: Stagecoach Rd; and 15: Roble Dr.
Upgrade existing Metal Beam Guardrail (MBGR) to Midwest Guardrail System (MGS). $ 890,000 $ 801,000 SA-Guardrail Federal 115 H12-05-016 05-Santa Barbara County-3 5 Santa Barbara County 21 37 Santa Barbara County SBCAG
Eight (8) pedestrian crossings: Joe Nightingale Elementary (2); Patterson Elementary (2); Calzada Av & Pine St; Burton Mesa Blvd & Calle Quarta; Cathedral Oaks Rd & Camino del Retiro; and Cathedral Oaks Rd & Via Chaparral.
Install rectangular rapid flashing beacons (RRFBs); and install raised concrete Pedestrian Refuge Islands at two of the crosswalks.
$ 388,000 $ 349,200 SA-PedCrossing State 116 H12-05-017 05-Santa Barbara County-4 5 Santa Barbara County 21 37 Santa Barbara County SBCAG Unincorporated public roads: 1) El Colegio Road in Isla Vista; 2) Orcutt Road in Orcutt; and 3) Stillwell Road in Orcutt.
Install Class II bike lanes and close a bikeway gap (Stillwell Rd); install/upgrade existing buffered bike lanes to protected bike lanes (Orcutt Rd and El Colegio Rd).
$ 362,000 $ 325,800 SA-BikeSafety State 5 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 117 H12-05-018 05-Santa Cruz-1 5 Santa Cruz 17 28 Santa Cruz County AMBAG Various non-signalized intersections. Implement daylighting and pedestrian crossing improvements. $ 2,147,000 $ 1,932,300 BCR Federal 118 H12-05-019 05-Santa Cruz-2 5 Santa Cruz 17 28 Santa Cruz County AMBAG Non-signalized intersections of Murray/Mott and Soquel/Poplar. Install signage, striping, bulb-outs, islands and rectangular rapid flashing beacons (RRFBs). $ 387,900 $ 349,110 SA-PedCrossing State 119 H12-05-020 05-Santa Cruz-3 5 Santa Cruz 17 28 Santa Cruz County AMBAG Water Street between North Branciforte Avenue and Poplar Avenue
Construct separated bike lanes on Water Street to fill a network gap and connect to existing separated bike infrastructure in a high active transportation use area.
$ 381,000 $ 342,900 SA-BikeSafety State 120 H12-05-021 05-Santa Maria-1 5 Santa Maria 19 37 Santa Barbara County SBCAG Intersections of Cook Street and Depot Street, and Blosser Road and Boone Street. Install compact roundabout and signalized intersection. $ 1,217,200 $ 1,095,480 BCR State 121 H12-05-022 05-Santa Maria-2 5 Santa Maria 19 37 Santa Barbara County SBCAG
Crossings at the intersections of Atlantic Pl./Bentley Ave., Mary Dr., Sonya Ln./Western Ave., Provance Ave./Ped.Trail,
Morrison/Lincoln, and McCLelland St./ Newlove Dr.
Insall raised pedestrian crossings/speed tables, signage/striping, and rectangular rapid flashing beacons (RRFBs). $ 357,600 $ 321,840 SA-PedCrossing State 122 H12-05-023 05-UC Santa Cruz-1a 5 University of California - Santa Cruz 17 28 Santa Cruz County AMBAG Hagar Drive on the UCSC Campus from Coolidge Drive to East Remote Parking Lot (0.7 miles).
Install three compact roundabouts, add vertical reflectors on curves and add new delineators to create protected bike lanes. $ 2,309,300 $ 2,078,370 BCR Federal 123 H12-06-001 06-Avenal-01 6 Avenal 16 33 Kings County KCAG The intersection of San Joaquin St and Park Ave.
Upgrade pedestrian crossing with rectangular rapid flashing beacons (RRFBs), curb extensions, traffic signs, stripes and pavement markings.
$ 350,000 $ 315,000 SA-PedCrossing State 124 H12-06-002 06-Avenal-02 6 Avenal 16 33 Kings County KCAG Along First Avenue from Kings Street to Reef-Sunset Middle School. Install buffered Class II bicycle lanes. $ 350,000 $ 315,000 SA-BikeSafety State 125 H12-06-003 06-Avenal-03 6 Avenal 16 33 Kings County KCAG On Avenal Cutoff Road approximately 100 feet southwest of the California Aqueduct. Upgrade existing guardrails and end treatments. $ 600,000 $ 540,000 SA-Guardrail State 126 H12-06-004 06-Bakersfield-1 6 Bakersfield 14, 16 32, 34 Kern County KCOG On Ashe Road between Ming Avenue and Stockdale Highway, and on Wible Road between McKee Road and Hosking Avenue. Install raised medians. $ 1,397,200 $ 1,257,480 BCR Federal 127 H12-06-005 06-Corcoran-01 6 Corcoran 16 33 Kings County KCAG The intersection of Bainum Avenue and Letts Avenue.
Upgrade pedestrian crossing at uncontrolled intersection with enhanced safety features including flashing beacons and curb extensions.
$ 350,000 $ 315,000 SA-PedCrossing State 128 H12-06-006 06-Corcoran-02 6 Corcoran 16 33 Kings County KCAG On Paris Avenue at turn onto Plymouth Avenue. Upgrade existing guardrail s and end treatments. $ 510,000 $ 459,000 SA-Guardrail State 129 H12-06-007 06-Farmers ville-1 6 Farmersville 14 33 Tulare County TCAG Intersection of N Magnolia Avenue and E Visalia Road; Intersection of S Farmersville Boulevard and E Oakland Street.
Install/upgrade pedestrian crossings with enhanced safety features for pedestrians, and install rectangular rapid flashing beacons (RRFBs).
$ 338,000 $ 304,200 SA-PedCrossing State 130 H12-06-008 06-Fresno-1 6 Fresno 12 8 Fresno County FCOG I ntersection of Blackstone Avenue and Sierra Avenue. Install retroreflective back plates, intersection lighting, protected left-turn phase with an existing left turn lane. $ 962,000 $ 865,800 BCR State 131 H12-06-009 06-Fresno-2 6 Fresno 14 31 Fresno County FCOG Intersection of First Street and Gettysburg Avenue, and intersection of Fresno Street and Shields Avenue.
Install retroreflective back plates, intersection lighting, and advanced stop bars. $ 766,900 $ 690,210 BCR State 132 H12-06-010 06-Fresno County-1 6 Fresno County 12 18 Fresno County FCOG Intersection of Millerton Road and Marina Drive near the unincorporated community of Friant. Install roundabout. $ 3,659,500 $ 2,957,603 BCR Federal 133 H12-06-011 06-Fresno County-2 6 Fresno County 14, 16 27, 31, 33 Fresno County FCOG Ten (10) two-way stop controlled intersections. Improve sight distance to intersections, install left-turn lane and add intersection lighting. $ 5,054,100 $ 4,295,985 BCR Federal 134 H12-06-012 06-Fresno County-3 6 Fresno County 14 31 Fresno County FCOG Intersection of Central Ave and Chestnut Ave just south of the unincorporated community of Malaga.
Provide protected left turn phasing and convert signal to mast arm. $ 1,024,000 $ 921,600 BCR State 135 H12-06-013 06-Kerman-1 6 Kerman 14 27 Fresno County FCOG Kearney Boulevard and Del Norte Avenue, First Street and El Mar Avenue, and First Sreet and F Street.
Improve school pedestrian crossing and intersection safety by installing high visibility crosswalks, advance pedestrian crossing signs and concrete curb bulb-outs.
$ 350,000 $ 315,000 SA-PedCrossing State 136 H12-06-014 06-Kern County-01 6 Kern County 16 35 Kern County KCOG Niles Street from 360 ft West of Virginia Avenue to Oswell Street, approximately 1.5 miles in unincorporated Bakersfield.
Install new raised median, remove existing medians, restrict left- turns and u-turns, and reduce left-turn conflict intersections. $ 9,672,800 $ 8,705,520 BCR Federal 137 H12-06-015 06-Kern County-2 6 Kern County 12, 16 32, 35 Kern County KCOG Various locations in unincorporated Bakersfield and Oildale; 4 signalized intersections at (Olive Drive & Airport Drive), (Eucalyptus Drive & Fairfax Road), (Brundage Lane & Fairfax Road), & (Fairfax Road & Pioneer Drive).
Install raised medians on approaches. $ 1,438,000 $ 1,294,200 BCR Federal 138 H12-06-016 06-KINGSBURG-1 6 Kingsburg 16 33 Fresno County FCOG Intersection of 10th Ave & Kern St. Install speed table, rectangular rapid flashing beacon (RRFBs), lighting, and new crosswalks. $ 1,184,800 $ 1,066,320 BCR State 139 H12-06-017 06-Lemoore-01 6 Lemoore 16 33 Kings County KCAG The intersection of 19th Ave and Freedom Dr.
Upgrade pedestrian crossing with enhanced safety features including in-roadway warning lights, bulb-outs, signs, stripes and pavement markings.
$ 350,000 $ 315,000 SA-PedCrossing State 140 H12-06-018 06-Lemoore-02 6 Lemoore 16 33 Kings County KCAG Cedar Lane from Bluejay Avenue to Lum Drive. Install buffered Class II bic ycle lanes. $ 350,000 $ 315,000 SA-BikeSafety State 141 H12-06-019 06-Madera City-1 6 Madera 14 27 Madera County MCTC At the signalized intersection of Ellis Street & Country Club Drive (Road 26).
Install left-turn lane and add turn phase, implement leading pedestrian interval (LPI), and install high visibility markings. $ 411,300 $ 370,170 BCR State 142 H12-06-020 06-McFarland-1 6 Mcfarland 16 35 Kern County KCOG Various locations throughout the city.
Install rectangular rapid flashing beacons (RRFBs), LED Flashing Stop signs, advanced yield lines/signs; re-stripe high visibility crosswalks; and install curb ramps.
$ 388,800 $ 349,920 SA-PedCrossing State 143 H12-06-021 06-Orange Cove-1 6 Orange Cove 14 31 Fresno County FCOG Various intersections throughout the city.
1. Install/replace/re-paint pedestrian crossings with hi-visibility continental crossings; 2. Re-paint/install "SLOW SCHOOL XING"/other texts; and 3. Re-paint/relocate existing Stop Bars. $ 388,800 $ 349,920 SA-PedCrossing State 144 H12-06-022 06-Parlier-01 6 Parlier 14 31 Fresno County FCOG The intersection of Newmark Avenue and 1st Street. Install raised pedestrian crossing and crossing enhancements including striping, signage and markings. $ 350,000 $ 315,000 SA-PedCrossing State 145 H12-06-023 06-Parlier-02 6 Parlier 14 31 Fresno County FCOG Manning Ave from Mendocino Ave to Madsen Ave. Install separated bike lane . $ 350,000 $ 315,000 SA-BikeSafety State 6 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 146 H12-06-024 06-Selma-1a 6 Selma 14 31 Fresno County FCOG Thompson Avenue and Lewis Street, various intersections along Wright Street, and various intersections along 2nd Street.
Install concrete curb bulb outs, rectangular rapid flashing beacons (RRFBs), solar LED flashing stop signs, new advance pedestrian crossing signs, and replace aging pedestrian crossing signs.
$ 1,000,400 $ 900,360 BCR State 147 H12-06-025 06-Taft-1a 6 Taft 12 32 Kern County KCOG Various locations along 6th Street.
Install rectangular rapid flashing beacons (RRFBs), LED flashing stop signs, advanced yield lines/signs, and re-stripe high- visibility crosswalks.
$ 376,000 $ 338,400 BCR State 148 H12-06-026 06-Taft-2 6 Taft 12 32 Kern County KCOG Various locations throughout the City Install enhanced safety features including rectangular rapid flashing beacons (RRFBs), LED flashing stop signs, advanced yield lines/signs, and re-stripe high visibility crosswalks. $ 348,100 $ 313,290 SA-PedCrossing State 149 H12-06-027 06-Tulare-2 6 Tulare 16 33 Tulare County TCAG Santa Fe Trail pedestrian crossings at Laspina Street, Tulare Drive, E Street, M Street, Cherry Street, and Blackstone Street. Install rectangular rapid flashing beacons (RRFBs). $ 388,800 $ 349,920 SA-PedCrossing State 150 H12-06-028 06-Tulare County-1 6 Tulare County 16 33 Tulare County TCAG Avenue 184 at Orange Belt Drive. Install left-turn lanes. $ 1,387,700 $ 1,248,930 BCR Federal 151 H12-06-029 06-Tulare County-2 6 Tulare County 14, 16 26 Tulare County TCAG Avenue 56 from E. Sutter Ave. (Earlimart) to Road 232 (Ducor) (12mi), Road 152 from Avenue 144 to Avenue 232 (11mi), Road 224 from Avenue 168 (Canal) to Avenue 192 (3mi), and Avenue 256 from Mooney Blvd. to Road 196 (SR 65) (10mi).
Upgrade and install signs, centerline and edgeline rumble strips, a left-turn lane, and flashing beacons. $ 4,535,000 $ 4,081,500 BCR Federal 152 H12-06-030 06-Tulare County-3 6 Tulare County 12, 16 26 Tulare County TCAG Various locations (4) (Diagonal 92B (DRV 92B), Road 68, Avenue 120, and Avenue 368). Upgrade existing damaged /outdated / destroyed guardrail. $ 1,109,400 $ 998,460 SA-Guardra il Federal 153 H12-06-031 06-Tulare County-4 6 Tulare County 16 33 Tulare County TCAG Various Locations. Road 126 crossing for Orosi High School, Road 28 crossing for Waukena Joint Union Elementary School, and Road 168 crossing for Wo odville Elementary School.
Install rectangular rapid flashing beacons (RRFBs) with advanced synchronized flashing beacons, and upgrade
pavement markings.
$ 388,500 $ 349,650 SA-PedCrossing State 154 H12-07-001 07-Calabasas-1 7 Calabasas 27 42 Los Angeles County SCAG
Various locations along Mulholland Hwy, Las Virgenes Rd, Dry Canyon Cold Creek Rd, Old Topanga Canyon Rd. End terminal of Helmond Dr, De Berry Drive, and Canwood St.
Remove and replace / upgrade damaged guardrail system. $ 520,600 $ 468,540 SA-Guardrail State 155 H12-07-002 07-Calabasas-2 7 Calabasas 27 42 Los Angeles County SCAG 22 traffic signals at various locations.
Install leading pedestrian interval (LPI) at 22 traffic signals, replace 10 pedestrian indications with countdown timers, and install Accessible Pedestrian Systems (APS) at 4 traffic signals. $ 271,800 $ 244,620 SA-PedCrossing State 156 H12-07-003 07-Carson-1 7 Carson 35 64 Los Angeles
County SCAG The intersection of Dolores St and Sepuleda Blvd.
Improve intersection lighting, improve signal hardware, signing/striping for NB approach, implement split phasing, install protected left turn signal phasing, pedestrian countdown signal heads, high visibility crosswalks.
$ 709,300 $ 638,370 BCR State 157 H12-07-004 07-Carson-2 7 Carson 35 69 Los Angeles
County SCAG The intersections of E. University Dr. at Avalon Blvd. and Avalon Blvd. at MLK Jr. St.
Install pedestrian crossings with enhanced safety features; install leading pedestrian interval (LPI). $ 385,000 $ 346,500 SA-PedCrossing State 158 H12-07-005 07-Culver City-1 7 Culver City 28 55 Los Angeles County SCAG
Green Valley Cir from Sepulveda Blvd to Centinela Ave, and Buckingham Pkwy from Green Valley Cir to Slauson Ave, in the Fox Hills neighborhood.
Install new bikeways (Class II/IV). $ 388,800 $ 349,920 SA-BikeSafety State 159 H12-07-006 07-Culver City-2 7 Culver City 28 55 Los Angeles County SCAG three (3) locations on Green Valley Cir between Sepulveda Blvd and Centinela Ave, in the Fox Hills Neighborhood. Install pedestrian crossing enhancements. $ 387,900 $ 349,110 SA-PedCrossing State 160 H12-07-007 07-Downey-1 7 Downey 30 64 Los Angeles
County SCAG
Fifteen (15) signalized intersections along the Firestone Boulevard corridor extending from Ryerson Avenue to Stewart and Gray Road, and the intersections of Downey Avenue at Alameda Street, and Brookshire Avenue at Alameda Street.
Upgrade existing traffic signal equipment including cabinets, controllers, vehicle indications, pedestrian countdown signal heads, APS pedestrian push buttons, and implementation of leading pedestrian intervals (LPIs).
$ 1,573,200 $ 1,415,880 BCR Federal 161 H12-07-008 07-Downey-2&5 7 Downey 30, 32 64 Los Angeles County SCAG Uncontrolled pedestrian crossings at intersections of Rives Ave & Adwen St and Conrad St & Montgomery St.
Upgrade crosswalks to include rectangular rapid flashing beacons (RRFBs), high visibility signing and striping. $ 299,700 $ 269,730 SA-PedCrossing State 162 H12-07-009 07-Downey-3 7 Downey 30 64 Los Angeles
County SCAG Nine (9) signalized intersections citywide.
Upgrade existing traffic signal equipment including vehicle indications, pedestrian countdown signal heads, APS pedestrian push buttons, and implementation of leading pedestrian intervals (LPIs).
$ 650,800 $ 585,720 BCR State 163 H12-07-010 07-Downey-4 7 Downey 30 64 Los Angeles
County SCAG Florence Avenue from Vultee Avenue/Arrington Avenue to Woodruff Avenue. Install raised median. $ 608,500 $ 547,650 BCR State 164 H12-07-011 07-Downey-6 7 Downey 30 64 Los Angeles
County SCAG Klondike Avenue and Bixler Avenue between Century Boulevard and Downey Avenue.
Install sidewalk and ADA curb ramps on both sides of Klondike Avenue and Bixler Avenue. Convert Klondike Avenue to a
Northbound one-way street and Bixler Avenue to a Southbound one-way street with appropriate signage.
$ 833,500 $ 750,150 BCR State 165 H12-07-012 07-El Monte-1 7 El Monte 22 49, 56 Los Angeles County SCAG
6 unsignalized intersections along Valley Blvd (El Monte Ave; Shirley Ave; Meeker Ave; La Madera Ave; Allgeyer Ave; Maxson Rd).
Install HAWK signals at 2 locations; install rectangular rapid flashing beacons (RRFBs) at 4 locations; upgrade crosswalks and curb ramps at 6 locations.
$ 779,300 $ 701,370 BCR State 166 H12-07-013 07-El Monte-2 7 El Monte 22 49 Los Angeles County SCAG
2 signalized intersections at Santa Anita Ave/Lower Azusa Rd & Santa Anita Ave/Kings Row; 1 signalized intersection at Valley Blvd/Gibson Rd.
Provide protected left turn phasing; convert signal to mast arm from pedestal-mounted; and implement leading pedestrian interval (LPI).
$ 308,800 $ 277,920 BCR State 167 H12-07-014 07-Glendale-1 7 Glendale 25 44, 52 Los Angeles County SCAG 120 Signalized Intersections citywide.
Improve signal hardware; install pedestrian countdown signal heads; install APS; and implement leading pedestrian interval (LPI).
$ 9,168,700 $ 8,251,830 BCR Federal 168 H12-07-015 07-Glendale-3 7 Glendale 25 44, 52 Los Angeles County SCAG
Four (4) Unsignalized Intersections: San Fernando Road and Palmer Avenue, Sonora Avenue and Randall Street, Verdugo Road and Glencoe Way, Glendale Avenue and Elk Avenue.
Install flashing beacons at stop controlled intersections; install rectangular rapid flashing beacons (RRFBs), and install Pedestrian Hybrid Beacons.
$ 1,942,400 $ 1,748,160 BCR Federal 7 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 169 H12-07-016 07-Glendale-4 7 Glendale 25 43 Los Angeles County SCAG Various intersections and mid block crossings.
Upgrade 11 pedestrian crosswalks and 8 school crosswalks with improved crossing striping, stop bars, yield lines, curb ramps and detectable warning surfaces.
$ 388,000 $ 349,200 SA-PedCrossing State 170 H12-07-017 07-Glendora-1 7 Glendora 25 48 Los Angeles County SCAG
10 intersections: Route 66 at Grand, Lone Hill, Pasadena, Loraine, Elwood, Glendora, Amelia, and Vermont; Grand Ave at Gladstone; and Glendora Ave at Baseline.
Convert signals from pedestal-mounted to mast arms at 8 intersections; and impove signal hardware at 2 intersections. $ 2,305,100 $ 2,074,590 BCR Federal 171 H12-07-018 07-Hawaiian Gardens-1 7 Hawaiian Gardens 36 67 Los Angeles County SCAG Norwalk Blvd at 216th St.
Install a HAWK signal on Norwalk Blvd at 216th St and remove the two adjacent crosswalks on Norwalk Blvd at 215th St and Tilbury St.
$ 388,900 $ 350,000 SA-PedCrossing State 172 H12-07-019 07-La Canada Flintridge-1 7 La Canada Flintridge 25 41 Los Angeles County SCAG Foothill Boulevard at Indiana Avenue. Install a HAWK signal. $ 389,200 $ 350,000 SA- PedCrossing State 173 H12-07-020 07-Long Beach-1 7 Long Beach 33, 35 65, 69 Los Angeles County SCAG Various locations throughout the City of Long Beach. Install/upgrade signs with new fluorescent sheeting. $ 10 ,796,700 $ 9,717,030 BCR Federal 174 H12-07-021 07-Long Beach-2 7 Long Beach 33, 35 65, 69 Los Angeles County SCAG Eight intersections in underserved areas of Long Beach. Mark high-contrast thermoplastic continental crosswalks in place of faded or outdated parallel bar crosswalks. $ 234,000 $ 210,600 SA-PedCrossing State 175 H12-07-022 07-Oxnard-1 7 Oxnard 19 38 Ventura County SCAG Seven intersections: Ventura Road / Town Center Drive, Oxnard Boulevard / Town Center Drive, Oxnard / Wagon Wheel Road / Esplanade Drive, Oxnard / Vineyard Avenue, Oxnard / Gonzales Road, Oxnard / Cooper Road, and Rose Avenue / Fifth Street.
Install electronic blank-out signs at intersections to enhance pedestrian safety. $ 388,800 $ 349,920 SA-PedCrossing State 176 H12-07-023 07-Paramount-1 7 Paramount 33 62 Los Angeles County SCAG Garfield Avenue at Motz Street/ Monroe Street and Alondra Boulevard at Minnesota Avenue. Install traffic signals. $ 1,035,000 $ 931,500 BCR State 177 H12-07-024 07-Pasadena-1 7 Pasadena 25 41 Los Angeles County SCAG Intersections of Villa St at Chester Ave, Arroyo Blvd at Seco St, and Bellefontaine St at Fairmount Ave.
Install rectangular rapid flashing beacons (RRFBs) with updated curb ramps, signage, lighting and striping. $ 360,700 $ 324,630 SA-PedCrossing State 178 H12-07-025 07-Pasadena-2 7 Pasadena 25 41 Los Angeles County SCAG Union Street between Arroyo Parkway and St John Avenue. Install a new half mile east-west bike facility creating a new connection to the Old Pasadena business district. $ 317,200 $ 285,480 SA-BikeSafety State 179 H12-07-026 07-Pico Rivera-1 7 Pico Rivera 30 56 Los Angeles County SCAG Eleven (11) signalized Intersections and one roadway segment:
Paramount Blvd from Goodbee St to Unser St.
Add left turn phase, convert pedestal mounted signal head to mast arms, and install striping through intersection; for the roadway segment: install raised median.
$ 2,110,100 $ 1,899,090 BCR Federal 180 H12-07-027 07-Pico Rivera-2 7 Pico Rivera 30 56 Los Angeles County SCAG
Eight (8) school crossings: 1. Sideview Dr & Shade Ln; 2. Orange Ave & Shade Ln; 3. Orange Ave & Homestead; 4. Orange Ave & Maxine St; 5. Durfee Ave at North Park Acedemy of Arts
Drivewa
y; 6. Serapis Ave & Aero Dr; 7. Serapis Ave & La Docena; Install safety improvements including crossing signage & striping, rectangular rapid flashing beacons (RRFBs), LED enhanced signage, and ADA improvements.
$ 388,800 $ 349,920 SA-PedCrossing State 181 H12-07-028 07-Rosemead-1 7 Rosemead 22 49 Los Angeles County SCAG 40 signalized intersections citywide. Install retro-reflective backplates, pedestrian countdown signal heads, and leading pedestrian interval (LPI). $ 2,858,200 $ 2,572,380 BCR Federal 182 H12-07-029 07-San Gabriel-1 7 San Gabriel 21 49 Los Angeles County SCAG
Five (5) intersections along the San Gabriel Blvd corridor and the Las Tunas Dr. corridor, including the intersection of San Gabriel and Las Tunas.
Install delineators, reflectors and/or object markers, improve signal hardware, install raised pavement markers and striping , and modify signal phasing for leading pedestrian interval (LPI). $ 121,100 $ 108,990 BCR State 183 H12-07-030 07-Santa Clarita-1 7 Santa Clarita 21 40 Los Angeles County SCAG
Five (5) intersections: McBean Pkwy / Magic Mountain Pkwy, McBean Pkwy / Northpark Dr, McBean Pkwy / Sunset Hills Dr, Copper Hill Dr / Decoro Dr, and Golden Valley Rd / Newhall Ranch Rd.
Install electronic blank-out signs to enhance pedestrian visibility. $ 388,800 $ 349,920 SA-PedCrossing State 184 H12-07-031 07-Santa Clarita-2 7 Santa Clarita 21 40 Los Angeles County SCAG At seven intersections along the Golden Valley Road/ Newhall Ranch Road corridor.
Install bicycle detection system and signage on trail system at seven signalized intersections to enhance bicyclist safety. $ 411,900 $ 350,000 SA-BikeSafety State 185 H12-07-032 07-Santa Monica-1 7 Santa Monica 24 51 Los Angeles County SCAG At the intersection of Lincoln Boulevard and Hill Street (north approach).
Install pedestrian signal on the north approach of the
intersection. $ 421,500 $ 350,000 SA-PedCrossing State 186 H12-07-033 07-Santa Monica-2 7 Santa Monica 24 51 Los Angeles County SCAG All signalized intersections along Neilson Way from Ocean Park Boulevard to Pico Boulevard.
Install retroreflective backplates, leading pedestrian interval, and protected left turns. $ 891,300 $ 802,170 BCR State 187 H12-07-034 07-Santa Monica-3a 7 Santa Monica 24 51 Los Angeles County SCAG
At 23rd Street & Hill Street, Ocean Avenue & Washington Street, Ocean Avenue & Idaho Avenue, Ocean Avenue & Palisades
Avenue, Ocean Avenue & Alta Avenue, Ocean Avenue &
Marguerita Avenue, and Ocean Avenue & Palisades Avenue.
Install RRFBs at all intersections; Install curb extensions at 23rd Street & Hill Street, Ocean Avenue & Idaho Avenue, Ocean Avenue & Alta Avenue, and Ocean Avenue & Marguerita
Avenue.
$ 1,296,500 $ 1,166,850 BCR State 188 H12-07-035 07-Santa Monica-3b 7 Santa Monica 24 51 Los Angeles County SCAG 23rd St & Hill Street and unsignalized intersections along Ocean Avenue and Colorado Avenue.
Install rectangular rapid flashing beacons (RRFBs), curb extensions and pedestrian crossing striping. $ 1,359,600 $ 1,223,640 BCR Federal 189 H12-07-036 07-Signal Hill-1 7 Signal Hill 33 69 Los Angeles County SCAG 11 signalized intersections.
Upgrades signals to provide protected left turn phasing at 8 intersections, upgrade signal visib ility at 3 signals, and provide pedestrian countdown heads. $ 3,022,200 $ 2,719,980 BCR Federal 190 H12-07-037 07-Signal Hill-2 7 Signal Hill 33 69 Los Angeles County SCAG Willow Street from California Avenue to Temple Avenue and Cherry Avenue from Spring Street to 20th Street.
Install signal coordination, signal head improvements, pedestrian countdown heads and signs. $ 2,164,900 $ 1,082,450 BCR State 191 H12-07-038 07-Simi Valley-1 7 Simi Valley 27 42 Ventura County SCAG At 91 signalized intersections citywide. Install retroreflective yellow tape on signal heads. $ 1,098,600 $ 988,740 BCR State 8 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 192 H12-07-039 07-South Gate-1 7 South Gate 33 63 Los Angeles County SCAG
8 signalized intersections on State Street between Tweedy Blvd and Santa Ana St, and Long Beach Blvd between Ardmore Ave and Kansas Ave.
Upgrade signal hardware, install mast arm, install leading pedestrian interval (LPI), and install raised median. $ 1,309,900 $ 1,178,910 BCR State 193 H12-07-040 07-South Gate-2 7 South Gate 33 63 Los Angeles County SCAG
Tweedy Boulevard between Alameda Street and Victoria Avenue and California Avenue between Tweedy Boulevard and Firestone Boulevard. All 9 signalized intersections within project corridor limits.
Install fiber optic cable and conduit with communication signal gear at all 9 signalized intersections and implement leading pedestrian intervals (LPIs).
$ 958,800 $ 862,920 BCR State 194 H12-07-041 07-Temple City-1 7 Temple City 25 49 Los Angeles County SCAG 27 signalized intersections citywide. Install retro-reflective backplates, replace signal heads, and implement leading pedestrian interval (LPI). $ 1,568,300 $ 1,411,470 BCR Federal 195 H12-07-042 07-Thousand Oaks-1 7 Thousand Oaks 27 44 Ventura County SCAG Olsen Road at the State Route 23 undercrossing, including the State Route 23 northbound and southbound off-ramp
intersections.
Install continuous bike lane stripi ng, increase the visibility of bike conflict areas, and install eastbound bike signal phasing at the Route 23/Olsen Road northbound off-ramp.
$ 825,800 $ 653,220 SA-BikeSafety State 196 H12-07-043 07-Ventura County-1 7 Ventura County 19 38 Ventura County SCAG The intersection of Santa Clara Avenue and Central Avenue.
Install protected left-turn signal heads/phases, relocate and install high visibility crosswalks, and convert all right-lanes to right-turn only lanes.
$ 555,200 $ 499,680 BCR State 197 H12-07-044 07-Ventura County-2 7 Ventura County 19 42 Ventura County SCAG The intersection of Las Posas Road and Laguna Road. Install flashing beacons and daytime headlight section signage. $ 110,000 $ 99,000 BCR Stat e 198 H12-07-045 07-Ventura County-3 7 Ventura County 27 38, 42 Ventura County SCAG Various locations throughout the County. Install rectangular rapid flashing beacons (RRFBs) and high visibility crosswalks. $ 386,000 $ 347,400 SA-PedCrossing State 199 H12-07-046 07-West Covina-1 7 West Covina 22 48 Los Angeles County SCAG 64 signalized intersections citywide.
Install retro-reflective backplates, replace signal heads, implement leading pedestrian interval (LPI) and provide protected left turn phasing.
$ 5,259,100 $ 4,733,190 BCR Federal 200 H12-08-001 08-Adelanto-1 8 Adelanto 21 39 San Bernardino County SCAG Bellflower Street from Cactus to Rancho Road. Widen shoulders; install striping and rumble strips. $ 1,167,8 00 $ 1,051,020 BCR State 201 H12-08-002 08-ADELANTO-2 8 Adelanto 21 39 San Bernardino County SCAG Intersection of Rancho Road at Bellflower Street.
Install a traffic signal, with advance signal ahead warning signs and legends, and reconstruct existing handicap ramps and crosswalk striping.
$ 980,000 $ 882,000 BCR State 202 H12-08-003 08-Cathedral City-1 8 Cathedral City 32 47 Riverside County SCAG Ortega Road & Via De Anza, Bella Vista Road & Calada Road, Century Park Drive & Foxborough Drive.
Implement pedestrian crossing enhancements including ADA- compliant curb ramps, rectangular rapid flashing beacons (RRFBs), high visibility continental crosswalks, and other signing and striping improvements.
$ 388,800 $ 349,920 SA-PedCrossing State 203 H12-08-004 08-Cathedral City-2 8 Cathedral City 32 47 Riverside County SCAG San Eljay Avenue & Doral Way, Dinah Shore Drive & Corregidor Drive, San Luis Rey Drive N & San Gabriel Circle E, San Luis Rey Drive S & San Gabriel Circle E, Ramon Road & Neuma Drive, and Ramon Road & Avenida Alvera / Canyon Vista Road.
Install pedestrian crossing at uncontrolled locations (signs and markings only) including pedestrian ramp upgrades, signing and striping.
$ 302,400 $ 272,160 BCR State 204 H12-08-005 08-Chino-1 8 Chino 22 53 San Bernardino
County SCAG 10 signalized intersections along a segment of Central Avenue from Riverside Drive to Phillips Boulevard.
Install yellow retroreflective borders on traffic signal back-plates and install new near-side signal heads. $ 250,500 $ 225,450 BCR State 205 H12-08-006 08-Chino Hills-1 8 Chino Hills 32 59 San Bernardino County SCAG Seventy-four (74) major intersections throughout the City of Chino Hills.
Install green bike lanes and bike lane markings on green background. $ 395,300 $ 349,470 SA-BikeSafety State 206 H12-08-007 08-Coachella-1a 8 Coachella 18 36 Riverside County SCAG Cesar Chavez St roadway and all signalized intersections from Park Ln to Ave 53. Nearby intersections: Ave 52 at Douma St; Cesar Chavez St access road at Ave 53; Cesar Chavez St at Bagdad Ave; Cesar Chavez St at Cairo St; Date Ave at Araby Ave.
Install protected bike lanes, pedestrian countdown signal heads and ADA-compliant audible push buttons, leading pedestrian intervals (LPIs), crosswalks, ADA-compliant curb ramps, curb extensions, pedestrian hybrid beacons, and raised medians. $ 2,903,300 $ 2,612,970 BCR Federal 207 H12-08-008 08-Coachella-1b 8 Coachella 18 36 Riverside County SCAG Cesar Chavez St roadway from Coachella Shopping Center South Driveway to Ave 53. Nearby intersections: Ave 52 at Douma St; Cesar Chavez St access road at Ave 53; Cesar Chavez St at Bagdad Ave; Cesar Chavez St at Cairo St; Date Ave at Araby Ave.
Install protected bike lanes, crosswalks and ADA-compliant curb ramps, a relocated crosswalk, pedestrian hybrid beacons, curb extensions, and raised medians.
$ 1,701,200 $ 1,531,080 BCR Federal 208 H12-08-009 08-Coachella-2 8 Coachella 18 36 Riverside County SCAG Cesar Chavez St from Park Lane to the south driveway of Coachella Shopping Center, and Cesar Chavez St from Avenue 53 to Avenue 54.
Install protected bike lanes. $ 184,800 $ 166,320 SA-BikeSafety State 209 H12-08-010 08-Coachella-3 8 Coachella 18 36 Riverside County SCAG Valley Rd from Jennifer Way to Las Palmas St. Install raised crossw alks. $ 335,600 $ 261,768 SA-PedCrossing State 210 H12-08-011 08-Colton-1 8 Colton 20 47 San Bernardino County SCAG
Intersection of: La Cadena Dr./D St., La Cadena Dr./E St., La Cadena Dr./Hanna St., La Cadena Dr./B St., 9th Street/D Street and Washington St./RV Center Drive (west).
Install rectangular rapid flashing beacons (RRFBs), signs, striping and other safety measures. $ 246,600 $ 221,940 SA-PedCrossing State 211 H12-08-012 08-Eastvale-1 8 Eastvale 31 60 Riverside County SCAG The intersection of Sumner Ave and 68th St. Convert a 3-way stop controlled intersection to a signalized intersection. $ 721,800 $ 642,402 BCR State 212 H12-08-013 08-Highland-1 8 Highland 19 45 San Bernardino County SCAG Thirty-five (35) signalized intersections throughout the city and Church Street at Glenheather Drive/Love Street intersection.
Install a new traffic signal, upgrade signal heads, and install retroreflective signal head backplates. $ 1,522,300 $ 1,370,070 BCR Federal 213 H12-08-014 08-Indian Wells-1 8 Indian Wells 18 47 Riverside County SCAG On Fairway Drive between Cielito Drive and El Dorado Drive. C onstruct sidewalk, curb ramps, and pedestrian crosswalk. $ 382,800 $ 344,520 SA-PedCros sing State 214 H12-08-015 08-Indian Wells-2 8 Indian Wells 18 47 Riverside County SCAG On Fairway Drive, Cook Street, Rancho Palmeras Drive, and El Dorado Drive. Install three (3) two-way cycle tracks and one (1) bicycle route. $ 353,300 $ 317,970 S A-BikeSafety State 215 H12-08-016 08-Lake Elsinore-1 8 Lake Elsinore 32 63 Riverside County SCAG Railroad Canyon Road from Summerhill Drive/Grape Street to Eastern City Boundary.
Relocate utility poles and install guardrails near Church Rd.
Install high friction surface treatment (HFST), LED/flashing beacon chevron and "Curve Ahead" signs, and additional
reflectors along curved segments. Improve signal hardware and signal timing.
$ 4,395,000 $ 3,955,500 BCR Federal 9 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 216 H12-08-017 08-Lake Elsinore-2 8 Lake Elsinore 32 63 Riverside County SCAG Thirty (30) signalized intersections. Install retroreflective signal backplates, install pedestrian countdown heads, and leading pedestrian interval (LPI). $ 846,400 $ 761,760 BCR State 217 H12-08-018 08-Menifee-01 8 Menifee 23 63 Riverside County SCAG Various locations. Upgrade existing guardrails and end treatments. $ 1,110,800 $ 999,720 SA-Guardrail State 218 H12-08-019 08-Menifee-03 8 Menifee 23 63 Riverside County SCAG Haun Road from Scott to Holland Rd; Garbani Road from Haun Road to Briggs Road; and Scott Road from Ascot Way to Sunset Avenue.
Install upgraded edgeline striping. $ 385,800 $ 347,220 SA-Edgeline State 219 H12-08-020 08-Menifee-2 8 Menifee 23 63 Riverside County SCAG Various unsignalized pedestrian crossings. Install rectangular rapid flashing beacons (RRFBs), high visibility crosswalk striping, and construct curb ramps. $ 373,000 $ 335,700 SA-PedCrossing State 220 H12-08-021 08-Montclair-1 8 Montclair 22 53 San Bernardino County SCAG Benson Avenue between Arrow Highway and Holt Boulevard.
Implement a road diet, install Class II bike lanes, right and left turn lanes, pedestrian countdown signal heads, and upgrade intersection pavement markings and pedestrian crossing at uncontrolled locations.
$ 3,156,900 $ 2,841,210 BCR Federal 221 H12-08-022 08-Moreno Valley-1 8 Moreno Valley 31 60 Riverside County SCAG 62 locations citywide.
Improve signal hardware, apply yellow retro-reflective tape, improve pavement friction and install leading pedestrian intervals (LPIs).
$ 1,808,000 $ 1,627,200 BCR Federal 222 H12-08-023 08-Moreno Valley-2 8 Moreno Valley 31 60 Riverside County SCAG 12 signalized intersections, 19 non-signalized intersections and two roadways along Iris Avenue and John F. Kennedy Drive.
Signalized intersections: improve signal hardware and install leading pedestrian interval (LPI); Non-signalized intersections:
upgrade intersection pavement markings and install flashing beacons rectangular rapid flashing beacons (RRFBs); Road segments: Install delineators, reflectors, object markers and impact attenuators.
$ 1,018,100 $ 916,290 BCR State 223 H12-08-024 08-Moreno Valley-R3 8 Moreno Valley 31 60 Riverside County SCAG The intersection of Dracaea Avenue and Helmsdale Street. Construct an enhanced crosswalk with pedestrian hybrid beacons and ADA compliant ramps. $ 349,600 $ 314,640 SA-PedCrossing State 224 H12-08-025 08-Rancho Cucamonga-02 8 Rancho Cucamonga 23 41, 50 San Bernardino County SCAG
Fairmont from Kenyon Way to Victoria Park Ln, Kenyon Way from Fairmont Way to Woodruff Pl, Woodruff Pl from Highland Ave to Kenyon Way, Highland Ave from Woodruff Pl to Day Creek Blvd.
Install Class II buffered bike lanes, Class II unbuffered bike lanes, Class III bike routes, install continental crosswalk and refresh existing striping.
$ 486,800 $ 348,816 SA-BikeSafety State 225 H12-08-026 08-Rancho Cucamonga-03 8 Rancho Cucamonga 23 41, 50 San Bernardino County SCAG Civic Center Drive from Haven Avenue to Utica Avenue.
Install rectangular rapid flashing beacons (RRFBs) and relocate crosswalk, construct ADA compliant access ramps and refuge island, and install Class II buffered bike lane and curb extensions.
$ 652,500 $ 350,000 SA-PedCrossing State 226 H12-08-027 08-Rancho Cucamonga-1 8 Rancho Cucamonga 23 41, 50 San Bernardino County SCAG
Ten (10) signalized intersections: Day Creek Blvd/Foothill Blvd, Archibald Ave/Foothill Blvd, Foothill Blvd/Hermosa Ave, Foothill Blvd/Vineyard Ave, 19th St/Carnelian, Foothill Blvd/Hellman Ave, Archibald Ave/Base Line Rd, Foothill Blvd/Haven Ave, Base Line Rd/East Ave, and Elm Ave/Foothill Blvd.
Install retroreflective borders on signal head backplates, continental crosswalks, new signal heads, type 1A signal pole and new pull box, and upgrade an ADA ramp.
$ 556,500 $ 500,850 BCR State 227 H12-08-028 08-Redlands-1 8 Redlands 23 50 San Bernardino County SCAG The intersection of Cajon Street and Cypress Avenue. Install traffic signal. $ 900,000 $ 810,000 BCR State 228 H12-08-029 08-Rialto-1A 8 Rialto 23 45 San Bernardino County SCAG 108 signalized intersections citywide. Install new signal heads and controllers and implement leading pedestrian intervals (LPIs). $ 5,418,000 $ 4,876,200 BCR Federal 229 H12-08-030 08-Rialto-1B 8 Rialto 23 45 San Bernardino County SCAG City of Rialto, California
Installation of new signal heads and controllers at signalized intersections with collisions and leading pedestrian intervals at locations with bicycle and pedestrian collisions.
$ 5,116,500 $ 4,604,850 BCR Federal 230 H12-08-031 08-Rialto-2 8 Rialto 23 45 San Bernardino County SCAG Two school crossings and other various locations. Install rectangular rapid flashing beacons (RRFBs) at two school crossings and pedestrian crossing upgrades at various locations. $ 298,600 $ 268,740 SA-PedCrossing State 231 H12-08-032 08-Riverside-1 8 Riverside 28, 31 50, 58, 60, 63 Riverside County SCAG 160 signalized Intersections citywide. Replace existing antiquated signal controllers with new 2070 signal controllers with updated software. $ 1,597,600 $ 798,800 BCR State 232 H12-08-033 08-Riverside-2 8 Riverside 28, 31 50, 58, 60, 63 Riverside County SCAG Various signalized intersections, roadway segments and nonsignalized multi-way stop-controlled intersections citywide.
Install pedestrian median fencing, upgrade pedestrian crossings with enhanced safety features, and upgrade multi-way stop controlled intersections.
$ 5,664,100 $ 5,097,690 BCR Federal 233 H12-08-034 08-Riverside-3 8 Riverside 31 58 Riverside County SCAG Van Buren Boulevard between Arlington Avenue and Magnolia Avenue.
Install / convert existing Class II bike lane to Class II buffered bike lane, including striping removals, new striping installation, pavement legends, bicycle detection, and signage modifications. $ 348,200 $ 313,380 SA-BikeSafety State 234 H12-08-035 08-San Bernardino-1 8 San Bernardino 23 45 San Bernardino County SCAG E Street from Fairway Drive to 10th Street. Install a hard median. $ 3,273,500 $ 2,946,150 BCR Federal 235 H12-08-036 08-Temecula-1 8 Temecula 32 71 Riverside County SCAG 41 intersections throughout the City of Temecula.
Install traffic signal hardware and communication interconnect system upgrades to improve traffic signal timing and optimize operations.
$ 1,105,700 $ 552,850 BCR State 236 H12-08-037 08-Wildomar-1 8 Wildomar 32 71 Riverside County SCAG Bundy Canyon Rd. at The Farm Rd., Bundy Canyon Rd. at
Orange St., Mission Trl. at Bundy Canyon Rd., Mission Trl. at Canyon Dr., Wildomar Trl. at Cervera Rd., Wildomar Trl. at Palomar St., Palomar St. at Gruwell St., and other locations citywide.
Install leading pedestrian interval (LPI), audible push buttons and enhanced crosswalk striping at signalized intersections; install rectangular rapid flashing beacons (RRFBs) and mid block crossings for Class I trail.
$ 590,000 $ 346,500 SA-PedCrossing State 237 H12-08-038 08-Wildomar-2 8 Wildomar 32 71 Riverside County SCAG Arterial and collector roadways Citywide. Install edgelines. $ 622,000 $ 348,920 SA-Edgeline State 238 H12-08-039 08-Wildomar-3 8 Wildomar 32 71 Riverside County SCAG Bundy Canyon Road from Mission Trail to Orange Street.
Install Class II buffered bike lanes.
$ 1,503,400 $ 349,600 SA-BikeSafety State 10 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 239 H12-08-040 08-Yucaipa-1 8 Yucaipa 19 47 San Bernardino County SCAG
Yucaipa Blvd (15 locations), Oak Glen Rd (8 locations), Bryant St (1 location), Wildwood Canyon Rd (1 location), Sand Canyon Rd (3 locations), Avenue E (1 location) and County Line Rd (1 location).
Upgrade signal heads with reflective tape and new backplates. $ 397,200 $ 357,480 BCR State 240 H12-09-001 09-Inyo County-1 9 Inyo County 4 26 Inyo County RURAL Trona-Wildrose Road (Slate Pass area). Install signs and high fricti on surface treatment (HFST). $ 518,200 $ 466,380 BCR State 241 H12-09-002 06-Kern Council of Governments-
1 9 Kern Council of
Governments 12 34 Kern County KCOG
A 2 mile segment of SR 58 in Kern County near California City and Edwards AFB North Gate entrance, from the SR 58
Intersection of California City Blvd to existing SR 58 freeway interchange at 140th St.
Reduce left-turn conflict at intersection. $ 4,520,000 $ 2,468,000 BCR Federal 242 H12-09-003 09-Town of Mammoth Lakes-1 9 Mammoth Lakes 4 8 Mono County RURAL Intersection of State Route 203 and Mountain Boulevard.
Install new crosswalk including the reconstruction of the north ADA ramp, the construction of a new ADA ramp on the south landing, striping, and installation of new posts, mast arms, and Rectangular Rapid Flashing Beacon (RRFB) system.
$ 869,500 $ 350,000 SA-PedCrossing State 243 H12-09-004 09-Ridgecrest-1 9 Ridgecrest 12 32 Kern County KCOG Las Flores Avenue at Sierra View Street. Upgrade the uncontrolled cros swalk with a HAWK signal. $ 388,900 $ 350,000 SA-PedCrossing State 244 H12-09-005 09-RIDGECREST-1a 9 Ridgecrest 12 32 Kern County KCOG Existing bike lanes along the following roadways: Ward Ave, Drummond Ave, Los Flores Ave, Ridgecrest Blvd, Upjohn Ave, Bowman Rd, Mahan St, Downs St, Norma St, China Lake Blvd, French Ave, Sunland St, Gateway Blvd, Richmond Rd, College Heights Blvd.
Upgrade bike lanes. $ 1,754,600 $ 1,579,140 BCR Federal 245 H12-09-006 09-RIDGECREST-1b 9 Ridgecrest 12 32 Kern County KCOG Existing bike lanes along the following roadways; Ward Ave, Drummond Ave, Los Flores Ave, Upjohn Ave, Bowman Rd,
Downs St, Norma St, China Lake Blvd, and Gateway Blvd.
The City proposes systematic improvements to 18.2 miles of roadways with bike lanes throughout the City to improve consistency, and to be in compliance with the current CA MUTCD.
$ 1,496,200 $ 1,346,580 BCR Federal 246 H12-09-007 09-RIDGECREST-2a 9 Ridgecrest 12 32 Kern County KCOG 14 signalized intersections on Downs Street, Norma Street, Drummond Ave, Bowman Rd, and China Lake Blvd.
Upgrade the signal hardware back-plates with retroreflective border and replace signal heads. $ 543,500 $ 489,150 BCR State 247 H12-09-008 09-RIDGECREST-2b 9 Ridgecrest 12 32 Kern County KCOG 14 signalized intersections on Downs Street, Norma Street, Drummond Ave, Bowman Rd, and China Lake Blvd.
Upgrade the signal hardware back-plates with retroreflective border. $ 207,000 $ 186,300 BCR State 248 H12-10-001 10-CALAVERAS COUNTY-1 10 Calaveras County 4 8 Calaveras County RURAL SR 4 and Pennsylvania Gulch Road. Install approximately 1050 feet of sidewalks, upgrade / install ADA curb ramps, and upgrade / install crosswalks. $ 391,800 $ 350,000 SA-PedCrossing State 249 H12-10-002 10-Manteca-1 10 Manteca 5 9 San Joaquin
County SJCOG
Signalized intersections: 42 traffic signals; Cottage Ave & North St, Yosemite Ave & Fremont St.; Unsignalized intersection:
Spreckels Ave & Norman Dr.; Roadway segments: Mission Ridge Dr (Syrah Ct to S Main St) and Yosemite Ave (Cottage to Commerce Ave).
Implement systemic signal improvements: retro-reflective backplates and leading pedestrian interval (LPI) at 42 signals; install protected left-turn phases at two signals; implement pedestrian crossing improvements at the unsignalized
intersection; install roadway median and lighting improvements. $ 2,610,500 $ 2,349,450 BCR Federal 250 H12-10-003 10-San Joaquin County-1 10 San Joaquin County 5 9, 13 San Joaquin County SJCOG Seventeen (17) signalized intersections throughout unincorporated San Joaquin County.
Replace 203 existing signal heads, install 9 new signal heads on existing poles, and install 1 new signal head on a new pole. $ 508,900 $ 458,010 BCR State 251 H12-10-004 10-San Joaquin County-2 10 San Joaquin County 5 9, 13 San Joaquin County SJCOG
Roads at San Joaquin County bridges numbered: 29C-082, 29C- 147, 29C-158, 29C-159, 29C-160, 29C-162, 29C-163, 29C-214, 29C-215 and 29C-231.
Upgrade guardrails, end treatments and terminal systems. $ 1,111,000 $ 999,900 SA-Guardrai l Federal 252 H12-10-005 10-San Joaquin County-3 10 San Joaquin County 5 9, 13 San Joaquin County SJCOG Fifteen (15) intersections in unincorporated San Joaquin County. Install intersection lighting and advance warning flashing beacons. $ 5,430,200 $ 4,887,180 BCR Federal 253 H12-10-006 10-Stanislaus County-1 10 Stanislaus County 4 22 Stanislaus County STANCOG Various locations. Install retroreflective back plates. $ 601,000 $ 540,900 BCR State 254 H12-10-007 10-Stockton-03 10 Stockton 5 13 San Joaquin County SJCOG
Carolyn Weston Blvd at French Camp Slough, Arch Airport Overpass, Eight Mile Road at Pixley Slough Bridge, West Lane at Calaveras River, Eight Mile Road & Hwy 99 W Frontage Road, Myrtle St west of Hwy 99, and Hwy 99 W Frontage Road at Mosher Slough.
Remove existing guardrails and replace with Midwest Guardrail System (MGS) guardrails. $ 930,000 $ 837,000 SA-Guardrail State 255 H12-10-008 10-Stockton-1 10 Stockton 5 13 San Joaquin County SJCOG
The intersections at Fred Russo Lane and March Lane, Precissi Lane and March Lane, and Montauban Avenue and Hammer
Lane.
Install protected left-turn signal heads, larger signal lens, retro- reflective back-plates, high reflectivity lane and crosswalk markings, traffic video detection system, and accessible pedestrian signals & near side signal heads at select locations. $ 2,195,100 $ 1,975,590 BCR Federal 256 H12-10-009 10-Stockton-2 10 Stockton 38 5 San Joaquin County SJCOG B Street intersections at Industrial Drive and Boeing Way. Construct roundabouts. $ 2,857,900 $ 2,572,110 BCR Federal 257 H12-10-010 10-Tracy-1 10 Tracy 5 13 San Joaquin
County SJCOG Multiple unsignalized intersections and 2 roadway segments throughout the City of Tracy.
Install larger stop signs, update intersection parking marking, and improve sight distance at identified unsignalized intersections throughout the city systematically.
$ 1,153,600 $ 1,038,240 BCR State 258 H12-10-011 10-Tuolumne County-1 10 Tuolumne County 4 8 Tuolumne County RURAL The non-signalized intersection at Tuolumne Road, Black Oak Road, and Woodhams Carne Road.
Add lighting, improve sight distance for vehicles, and install high- friction surface treatment (HFST) approaching and through the intersection.
$ 806,500 $ 725,850 BCR State 259 H12-10-012 10-Tuolumne County-2 10 Tuolumne County 4 8 Tuolumne County RURAL Multiple guardrail locations on Bonds Flat Road, La Grange Road, O'Byrnes Ferry Road, Parrotts Ferry Road, Rawhide Road, Kewin Mill Road, and Longeway Road.
Remove and replace existing guardrail systems with upgraded steel-post Midwest Guardrail System (MGS) guardrails. $ 1,109,400 $ 998,460 SA-Guardrail Federal 260 H12-10-013 10-Tuolumne County-3 10 Tuolumne County 4 8 Tuolumne County RURAL Tuolumne Road from Mono Way in East Sonora to Tuolumne Road North in Tuolumne City.
Enhance the centerline striping with the addition of recessed retroreflective pavement markers. $ 147,200 $ 132,480 BCR State 11 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 261 H12-11-001 11-Chula Vista-1 11 Chula Vista 40 80 San Diego County SANDAG Olympic Parkway from Brandywine Avenue to Eastlake Parkway. Install separated bike lanes, variable speed feedback signs, and high-visibility crosswalks and signage. $ 1,955,900 $ 1,760,310 BCR Federal 262 H12-11-002 11-El Cajon-1 11 El Cajon 40 79 San Diego County SANDAG On Washington Ave. between First St. and Jamacha Rd.
Install raised concrete medians throughout the corridor. Install a high visibility pedestria n crossing at the intersection of Washington Ave. at Dorothy St.
$ 3,133,500 $ 2,820,150 BCR Federal 263 H12-11-003 11-Encinitas-1 11 Encinitas 38 77 San Diego County SANDAG Encinitas Boulevard from Calle Magdalena to Via Cantebria. Insta ll separated bike lanes. $ 890,400 $ 801,360 BCR State 264 H12-11-004 11-Encinitas-2 11 Encinitas 38 77 San Diego County SANDAG El Ca mino Real from Willowspring Dr to Avenida De Las Adelsas. I nstall protected bike lanes. $ 492,000 $ 442,800 BCR State 265 H12-11-005 11-Encinitas-3 11 Encinitas 38 77 San Diego County SANDAG South Coast Highway 101 from City Limits (Solana Beach) to the North Cardiff State Beach Driveway (north of Los Olas).
Install sidewalk and path along the east side of South Coast Highway 101. $ 1,862,900 $ 1,676,610 BCR Federal 266 H12-11-006 11-Encinitas-4 11 Encinitas 38 77 San Diego County SANDAG South Coast Highwy 101 at Harbaugh Seaside Trails.
Install a pedestrian crossing at Harbaugh Seaside Trails including refuge median island, rectangular rapid flashing beacons (RRFBs), high visibility continental crosswalks and other signing and striping improvements.
$ 388,800 $ 349,920 SA-PedCrossing State 267 H12-11-007 11-National City-1 11 National City 18 80 San Diego County SANDAG Intersections of 8th Street & A Avenue, 8th Street & B Avenue, and 8th Street & C Avenue.
Install rectangular rapid flashing beacons (RRFBs) for 6 crosswalks. $ 388,700 $ 349,830 SA-PedCrossing State 268 H12-11-008 11-National City-2 11 National City 18 80 San Diego County SANDAG Various corridors, including 16th Street, Palm Avenue, N Avenue, and Harbison Avenue. Install edgeline striping. $ 386,400 $ 347,760 SA-Edgeline State 269 H12-11-009 11-National City-3 11 National City 18 80 San Diego County SANDAG 4th Street corridor at the intersections of B Avenue, F Avenue, Laurel Avenue, V Avenue, and Hill Drive.
Install low-cost compact/mini roundabouts/traffic circles along the 4th Street corridor. $ 838,200 $ 754,380 BCR State 270 H12-11-010 11-San Diego-1 11 San Diego 39 78 San Diego County SANDAG Hotel Circle South & Taylor St/Hotel Circle North. Install a rou ndabout. $ 218,000 $ 196,200 BCR State 271 H12-11-011 11-San Diego County-1 11 San Diego County 40 75 San Diego County SANDAG The intersection of W Aviation Road and S Main Avenue in the community of Fallbrook.
Convert intersection to all-way stop control; provide pedestrian connection and pedestrian ramps; and provide/enhance
advanced warning signage and markings.
$ 307,200 $ 276,480 BCR State 272 H12-11-012 11-San Diego County-2 11 San Diego County 18 79 San Diego County SANDAG The intersection of Jamacha Boulevard and Grand Avenue in the community of Spring Valley.
Provide protected left turn phasing and provide pedestrian enhancements such as marked crosswalks, curb extensions, dual pedestrian ramps, and leading pedestrian interval (LPI). $ 1,338,100 $ 1,204,290 BCR Federal 273 H12-11-013 11-San Diego County-3 11 San Diego County 18 80 San Diego County SANDAG Bonita Road from Central Avenue to the County Limits near Villas Drive.
Install Class II buffered bike lanes to complete the missing segment, green paint at conflict zones and through intersections, and 2 dynamic/variable speed warning signs.
$ 599,200 $ 539,280 BCR State 274 H12-11-014 11-Vista-1 11 Vista 38 74 San Diego County SANDAG E. Vi sta Way from Willia mston Street to Taylor Street.
Install a raised median with directional median openings, pedestrian fencing at key locations, new or upgraded signs with fluorescent sheeting, retro-reflective backplates at existing traffic signals.
$ 2,893,400 $ 2,604,060 BCR Federal 275 H12-12-001 12-Anaheim-1 12 Anaheim 37 67 Orange County SCAG Brookhurst Street from Sequoia Avenue to Ball Road. Install raised median s. $ 5,579,000 $ 5,021,100 BCR Federal 276 H12-12-002 12-Costa Mesa-1 12 Costa Mesa 37 73 Orange County SCAG Junipero Drive from Arlington Drive to Presidio Drive, including the intersections of Junipero Drive at Arlington Drive and Junipero Drive at Presidio Drive.
Construct Class IV bicycle facility including slurry seal, signing, and striping, and construct a raised intersection at Junipero & Arlington.
$ 388,800 $ 349,920 SA-BikeSafety State 277 H12-12-003 12-Fullerton-1 12 Fullerton 29, 34 67 Orange County SCAG Intersections of Orangethorpe Ave at Harbor Blvd, Orangethorpe Ave at Euclid St, Orangethorpe Ave at Brookhurst Rd,
Orangethorpe Ave at Magnolia Ave, Harbor Blvd at
Commonwealth Ave, and Harbor Blvd at Chapman Ave.
Improve signal hardware and install intersection lighting. Provide protected left turn phase. $ 3,576,000 $ 3,218,400 BCR Federal 278 H12-12-004 12-Laguna Niguel-1 12 Laguna Niguel 37 74 Orange County SCAG Golden Lantern from Crown Valley Parkway to Chapparosa Park Road, approximately 2 miles in length.
Install vertical element separators; implement green bike lane conflict zone striping; and implement white buffer striping. $ 950,000 $ 346,500 SA-BikeSafety State 279 H12-12-005 12-Orange-1 12 Orange 37 68 Orange County SCAG 28 signalized intersections citywide. Install larger signal heads and yello w retroreflective backplates. $ 734,800 $ 661,320 BCR State 280 H12-12-006 12-Orange-2 12 Orange 37 68 Orange County SCAG Four crossing locations: Shaffer St & Everett Pl; Walnut Ave & Harwood St; Shaffer St 130' N/o Almond Ave; and Rancho Santiago Blvd & Orange Grove Ave.
Install rectangular rapid flashing beacons (RRFBs). $ 388,600 $ 349,740 SA-PedCrossing State
281 H12-12-007 12-Orange-3 12 Orange 37 68 Orange County SCAG Four (4) locations: Glassell Street from Riverdale Ave to Katella Ave; Fletcher Street from Batavia St to Glassell St; Main Street from Taft Ave to Collins Ave; and Canyon View Ave from Newport Blvd to Jamboree Rd.
Install bike lanes and green paint at conflict points throughout the city. $ 388,800 $ 349,920 SA-BikeSafety State 282 H12-12-008 12-Orange-4 12 Orange 37 68 Orange County SCAG Twelve (12) street segments approximately 8.5 miles in length. Install edge lines striping. $ 297,300 $ 267,570 SA-Edgeline State 283 H12-12-009 12-Orange County-1 12 Orange County 34, 36, 37, 38 59, 67, 68, 70, 71, 72, 73, 74 Orange County SCAG Fifty-nine (59) signalized intersections. Install retroreflective signal backplates and leading pedestrian interval (LPI). $ 1,326,200 $ 1,193,580 BCR State 284 H12-12-010 12-Orange County-2 12 Orange County 32, 34, 36, 37, 38 59, 67, 70, 71 Orange County SCAG Sixty-one (61) uncontrolled intersections and seven (7) pedestrian crossings across uncontrolled approaches at side-street stop- controlled intersections.
Install stop signs/bars/pavement markers and rectangular rapid flashing beacon (RRFB). $ 829,900 $ 746,910 BCR State 285 H12-12-011 12-Orange County-3 12 Orange County 30, 37 59, 71, 73 Orange County SCAG Two (2) curved rural roads: Brea Blvd/Brea Canyon Rd and Silverado Canyon Road.
Install centerline rumble stripes, chevron signs, speed reduction markings, and rectangular rapid flashing beacon (RRFB). $ 960,300 $ 864,270 BCR State 286 H12-12-012 12-Placentia-1 12 Placentia 29, 34 59 Orange County SCAG Various Locations throughout the City, including 7 signalized intersections and 2 unsignalized intersections.
Install leading pedestrian intervals (LPIs) and install/upgrade pedestrian crossings. $ 281,100 $ 252,990 BCR State 287 H12-12-013 12-Santa Ana-1 12 Santa Ana 34 68 Orange County SCAG On 1st Street between Downtown Plaza and Euclid Street, on Bristol Street from Riverglen Lane to Willits Avenue, and Broadway/Washington Avenue and Main Street/17th Street Intersections.
Install high visibility marked crosswalks. $ 342,300 $ 308,070 SA-PedCrossing State 12 of 13 December 18, 2024
No. Unique
Project ID Original Application ID Caltrans District Agency Name State Senate District(s) State Assembly District(s) County MPO Location of Work Description of Work Project Cost HSIP Funds Application Category* Funding Type (State/Federal)
Project List for Highway Safety Improvement Program (HSIP) Cycle 12 (Sort by Caltrans District and Agency Name)
* Application Category: BCR = Benefit‐Cost Ratio; SA‐PedCrossing = Set‐aside for Pedestrian Crossing Enhancements; SA‐Guardrail = Set‐aside for Guardrail Upgrade; SA‐Edgelines = Set‐aside for Installing Edgelines; SA‐Bike Safety = Set‐aside for Bike Safety Improvement. 288 H12-12-014 12-Santa Ana-2 12 Santa Ana 34 68 Orange County SCAG First Street between Harbor Blvd to Susan Street and First Street between Fairview Street and Center Street. Install street lights. $ 2,756,000 $ 2,480,400 BCR Federal TOTAL 352,552,400 $ 299,551,885$
13 of 13 December 18, 2024