888OOGGGGBHHHH04-Hercules-H1

1. City of Hercules – Vicinity Map

1. City of Hercules – Vicinity Map

1213

36.10 TSTEP / PED SIG
E G
G
11'6'
5'
2'
6'15'
11'
11'
10+00
11+00
12+00
13+00
8 1
7 13'
12'
11'
17'

CITY OF

HERCULES R/W
City of Hercules
Engineering Department
111 Civic Drive
Hercules, CA 94547
Tel: (510) 799-8244, Fax: (510) 799-8249
www.ci.hercules.ca.us
DATEBYDESCRIPTIONNO.

Checked By: RB
Drawn By: MA
Design By: MA
Scale: As Shown
Sheet Number

EXHIBIT
JULY 12, 2022

PRELIMINARY
925 • 685 • 4569 bellecci.com

SYCAMORE

MULTIPURPOSE

PATH AND BIKE

LANE PROJECT
1 SYCAMORE
AVENUE
1 of 6 Sheets
SCALE: 1"=20'

SYCAMORE AVENUE
LEGEND:

CONCRETE BIKE PATH (4" CONC OVER 4" AB)

LED PEDESTRIAN LIGHTAPPROXIMATE CITY RIGHT OF WAY
1 CONSTRUCTION NOTES:

INSTALL CURB RAMP PER CALTRANS STD PLAN A88A
2INSTALL REINFORCED CONCRETE RETAINING WALL (HEIGHT VARIES4'± TO 10'±). SEE SECTION A-A THIS SHEET 3ADJUST TO GRADE UTILITY BOX
4RELOCATE SIGN & POST
5 RELOCATE CLOCK TOWER
6REMOVE ISLAND TO INSTALL BIKE LANE
7 INSTALL SIGN R10-15b ON NEW POST

SAN PABLO AVENUESAN PABLO AVENUE

SYCAMORE AVENUE
8 INSTALL SIGN R81 (CA) ON NEW POST
MATCHLINE: SEE PAGE 2

BIKE FACILITIES
END
BEGIN
SD
SD

G G G G G G G G G G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
GG
EE
EEEE
6'±
10'
13'
11'
6'

12.7'
5'
2'
10'±
5'±
10'±
5'±
6'
15'
12'
10'
16'
12'
14'
13+00
14+00
15+00
16+00
17+00
18+00
2 2
2 1
1 8
1 12'
12'
12'
13'
12'
12'
18'
18'
24'
APPROX.

CALTRANS R/W

REINFORCED CONCRETERETAINING WALL
8' WALL
10' WALL
10' WALL
10' WALL
6' WALL
4' WALL
4' WALL

RAILROAD
APPROX.RAILROAD R/W

CITY OF

HERCULES R/W
APPROX.RAILROAD R/W
APPROX.

CALTRANS R/W
- A
A-

NEW BIKE
PATH

PROTECT IN PLACE

EX CURB & GUTTER

EX GRADE

PROTECT IN PLACE

EX RAILROAD

ABUTMENT

EX RAILROAD

EX RAILROAD

ABUTMENT

REINFORCED CONC

RETAINING WALL
2% MAX

SHOULDER SHOULDER
4'± TO 10'±
10'
10"
2' 2'
12'± 12'± 13'±

TRAVEL LANETRAVEL LANETRAVEL LANE
City of Hercules
Engineering Department
111 Civic Drive
Hercules, CA 94547
Tel: (510) 799-8244, Fax: (510) 799-8249
www.ci.hercules.ca.us
DATEBYDESCRIPTIONNO.

Checked By: RB
Drawn By: MA
Design By: MA
Scale: As Shown
Sheet Number

EXHIBIT
JULY 12, 2022

PRELIMINARY
925 • 685 • 4569 bellecci.com

SYCAMORE

MULTIPURPOSE

PATH AND BIKE

LANE PROJECT
2 SYCAMORE
AVENUE
2 of 6 Sheets
MATCHLINE: SEE PAGE 3
SCALE: 1"=20'

SYCAMORE AVENUE

SECTION A-A
NTS
WILLOW
AVENUE
MATCHLINE: SEE PAGE 1
LEGEND:

CONCRETE BIKE PATH (4" CONC OVER 4" AB)LED PEDESTRIAN LIGHT

APPROXIMATE CITY RIGHT OF WAY
1 CONSTRUCTION NOTES:

INSTALL CURB RAMP PER CALTRANS STD PLAN A88A
2 INSTALL REINFORCED CONCRETE RETAINING WALL
(HEIGHT VARIES 4'± TO 10'±). SEE SECTION A-A THIS SHEET 3ADJUST TO GRADE UTILITY BOX
4RELOCATE SIGN & POST
5 RELOCATE CLOCK TOWER
6 7
INSTALL SIGN R10-15b ON NEW POST8
INSTALL SIGN R81 (CA) ON NEW POST

BIKE FACILITIES
GGG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G

GGGGGGGGGGGG
G
G
G
G
G
E
E
EEEE
EEEEE
12'
12'
2'
12'
12'
5'
2'
2'
5'
13'
12'
18'
12'
12'
11'
14'
10'
5'

5.5'
19+0020+00
21+00
22+00
23+00
3 3
3 4
1 5
7 10'
5'
18'
12'
12'
14'
13'
10'±

PROPERTY OWNED BYCITY OF HERCULES

PROPERTY OWNED BYCITY OF HERCULES
- B B
-

NEW BIKE PATH

PROTECT IN

PLACE EX CURB
& GUTTER EX GRADE
GRADE

TO MATCH
2:1 MAX
2% MAX
SCARIFY & COMPACT TO 90%

RELATIVE COMPACTION

SEPARATION

BETWEEN BIKE

PATH & ROAD
10'5'12'± 18'±

TRAVEL LANETRAVEL LANETRAVEL LANE
12'±
City of Hercules
Engineering Department
111 Civic Drive
Hercules, CA 94547
Tel: (510) 799-8244, Fax: (510) 799-8249
www.ci.hercules.ca.us
DATEBYDESCRIPTIONNO.

Checked By: RB
Drawn By: MA
Design By: MA
Scale: As Shown
Sheet Number

EXHIBIT
JULY 12, 2022

PRELIMINARY
925 • 685 • 4569 bellecci.com

SYCAMORE

MULTIPURPOSE

PATH AND BIKE

LANE PROJECT
3 SYCAMORE
AVENUE
3 of 6 Sheets
MATCHLINE: SEE PAGE 4
MATCHLINE: SEE PAGE 2

CREEKSIDE CENTER
SCALE: 1"=20'

SYCAMORE AVENUE

SECTION B-B
NTS
LEGEND:

CONCRETE BIKE PATH (4" CONC OVER 4" AB)

LED PEDESTRIAN LIGHT

APPROXIMATE CITY RIGHT OF WAY
1 CONSTRUCTION NOTES:

INSTALL CURB RAMP PER CALTRANS STD PLAN A88A
2 INSTALL REINFORCED CONCRETE RETAINING WALL
(HEIGHT VARIES 4'± TO 10'±). SEE SECTION A-A THIS SHEET 3ADJUST TO GRADE UTILITY BOX
4RELOCATE SIGN & POST
5 RELOCATE CLOCK TOWER
6REMOVE ISLAND TO INSTALL BIKE LANE
7 INSTALL SIGN R10-15b ON NEW POST8
INSTALL SIGN R81 (CA) ON NEW POST

BIKE FACILITIES

11.5'
12'

5.5'
2'
12'
12'
12'

5.5'2'
2'
12'
12'5'
2'

5.5'
2'
12'
12'

10.4'
11'
12'
12'
6'

13.5'
5'
2' 24+00
25+00
26+00
27+00
8 7
City of Hercules
Engineering Department
111 Civic Drive
Hercules, CA 94547
Tel: (510) 799-8244, Fax: (510) 799-8249
www.ci.hercules.ca.us
DATEBYDESCRIPTIONNO.

Checked By: RB
Drawn By: MA
Design By: MA
Scale: As Shown
Sheet Number

EXHIBIT
JULY 12, 2022

PRELIMINARY
925 • 685 • 4569 bellecci.com

SYCAMORE

MULTIPURPOSE

PATH AND BIKE

LANE PROJECT
4 SYCAMORE
AVENUE
4 of 6 Sheets
MATCHLINE: SEE PAGE 5
SCALE: 1"=20'

SYCAMORE AVENUE

TURQUOISE DRIVE

PARK LAKE PLAZA

CREEKSIDE CENTER
MATCHLINE: SEE PAGE 3
LEGEND:

CONCRETE BIKE PATH (4" CONC OVER 4" AB)

LED PEDESTRIAN LIGHTAPPROXIMATE CITY RIGHT OF WAY
1 CONSTRUCTION NOTES:

INSTALL CURB RAMP PER CALTRANS STD PLAN A88A
2INSTALL REINFORCED CONCRETE RETAINING WALL (HEIGHT VARIES4'± TO 10'±). SEE SECTION A-A THIS SHEET 3ADJUST TO GRADE UTILITY BOX
4RELOCATE SIGN & POST
5 RELOCATE CLOCK TOWER
6REMOVE ISLAND TO INSTALL BIKE LANE
7 INSTALL SIGN R10-15b ON NEW POST8
INSTALL SIGN R81 (CA) ON NEW POST

BIKE FACILITIES
12'
12'
11'
12'
5'
11'±
2'
13'
13'
12'
12'6'
13'

10.4'
2'
13'
12'
12'

5.5'
2'
6'13'
28+00
29+00
30+00
31+0032+00
6 8
City of Hercules
Engineering Department
111 Civic Drive
Hercules, CA 94547
Tel: (510) 799-8244, Fax: (510) 799-8249
www.ci.hercules.ca.us
DATEBYDESCRIPTIONNO.

Checked By: RB
Drawn By: MA
Design By: MA
Scale: As Shown
Sheet Number

EXHIBIT
JULY 12, 2022

PRELIMINARY
925 • 685 • 4569 bellecci.com

SYCAMORE

MULTIPURPOSE

PATH AND BIKE

LANE PROJECT
5 SYCAMORE
AVENUE
5 of 6 Sheets
MATCHLINE: SEE PAGE 6
SCALE: 1"=20'
MATCHLINE: SEE PAGE 4

SYCAMORE AVENUE

REFUGIO VALLEY
ROAD
LEGEND:

CONCRETE BIKE PATH (4" CONC OVER 4" AB)

LED PEDESTRIAN LIGHT

APPROXIMATE CITY RIGHT OF WAY
1 CONSTRUCTION NOTES:

INSTALL CURB RAMP PER CALTRANS STD PLAN A88A
2INSTALL REINFORCED CONCRETE RETAINING WALL (HEIGHT VARIES 4'± TO 10'±). SEE SECTION A-A THIS SHEET
3 ADJUST TO GRADE UTILITY BOX
4RELOCATE SIGN & POST
5RELOCATE CLOCK TOWER
6 REMOVE ISLAND TO INSTALL BIKE LANE
7 INSTALL SIGN R10-15b ON NEW POST8
INSTALL SIGN R81 (CA) ON NEW POST

BIKE FACILITIES
12'
11'2'
5'
33+0034+0035+0036+00
37+00
7 City of Hercules
Engineering Department
111 Civic Drive
Hercules, CA 94547
Tel: (510) 799-8244, Fax: (510) 799-8249
www.ci.hercules.ca.us
DATEBYDESCRIPTIONNO.

Checked By: RB
Drawn By: MA
Design By: MA
Scale: As Shown
Sheet Number

EXHIBIT
JULY 12, 2022

PRELIMINARY
925 • 685 • 4569 bellecci.com

SYCAMORE

MULTIPURPOSE

PATH AND BIKE

LANE PROJECT
6 SYCAMORE
AVENUE
6 of 6 Sheets
MATCHLINE: SEE PAGE 5
SCALE: 1"=20'

SYCAMORE AVENUE

CREEKSIDE CENTER
LEGEND:

CONCRETE BIKE PATH (4" CONC OVER 4" AB)

LED PEDESTRIAN LIGHTAPPROXIMATE CITY RIGHT OF WAY
1 CONSTRUCTION NOTES:

INSTALL CURB RAMP PER CALTRANS STD PLAN A88A
2INSTALL REINFORCED CONCRETE RETAINING WALL (HEIGHT VARIES4'± TO 10'±). SEE SECTION A-A THIS SHEET 3ADJUST TO GRADE UTILITY BOX
4RELOCATE SIGN & POST
5 RELOCATE CLOCK TOWER
6REMOVE ISLAND TO INSTALL BIKE LANE
7 INSTALL SIGN R10-15b ON NEW POST8
INSTALL SIGN R81 (CA) ON NEW POST

BIKE FACILITIES
Item # Description Quantity Unit Unit Price Item Total
Miscellaneous Items
1 Mobilization 1 LS $49,800.00 $49,800
2 Traffic Control 1 LS $29,900.00 $29,900
3 Storm Water Pollution Control 1 LS $5,000.00 $5,000
4 Clearing & Grubbing 1 LS $10,000.00 $10,000
Demolition
5 Remove Concrete Median 300 SF $5.00 $1,500
6 Remove Landscape Area 7,800 SF $1.00 $7,800
Improvements
7 Install Concrete Bike Path 7,800 SF $30.00 $234,000
8 Install PCC Curb & Gutter 100 LF $100.00 $10,000
9 Install PCC Curb Ramp 4 EA $8,000.00 $32,000
10 Reinforced Concrete Retaining Wall 1 LS $300,000.00 $300,000 11 Pedestrian Light (Including Pull Boxes, Conduits,
Conductors) 6 EA $15,000.00 $90,000
12 Adjust to Grade Utility Box 3 EA $1,000.00 $3,000
13 Relocate Clock Tower 1 EA $50,000.00 $50,000
14 Railroad Permit 1 LS $100,000.00 $100,000
Signing & Striping
15 Detail 39 4,000 LF $5.00 $20,000
16 Detail 39A 1,430 LF $5.00 $7,150
17 6" White Stripe Spaced at 15' 250 LF $6.00 $1,500
18 12" White Stripe 470 LF $5.00 $2,350
19 Bike Lane (Greenback) 6,910 SF $15.00 $103,650
20 Bike Lane Symbol with Person 16 EA $500.00 $8,000
21 Bike Lane Arrow 9 EA $300.00 $2,700
22 Type IV Arrow 6 EA $300.00 $1,800
23 Type VII (R) Arrow 1 EA $400.00 $400
24 Install Sign R81 (CA) on New Post 4 EA $500.00 $2,000 25 Install Sign R10-15b on New Post 3 EA $500.00 $1,500 26 Relocate Sign & Post 1 EA $750.00 $750
$1,074,800
$214,960
$1,289,760
$39,000
$129,000
$129,000
City of Hercules
Sycamore Multipurpose Path and Bike Lane Project
Preliminary Submittal - Engineer's Estimate
Date: 6/27/22
Subtotal
Studies/Plans (3% of Total)
Final Design (10% of Total)
Construction Management (10% of Total)
Total Construction Cost
20% Contingency
Sycamore Avenue Bicycle & Pedestrian East-West City Connector Project Existing Conditions – Looking North along Sycamore Avenue at Railroad/Freeway Overcrossings 7/14/2022

Sycamore Avenue Bicycle & Pedestrian East-West City Connector Project Existing Conditions – Looking South along Sycamore Avenue from Willow Ave 7/14/2022