kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840
MEMORANDUM
To: Jeff Brown
City of Hercules
From: Clara Ho, P.E.
Kimley-Horn and Associates, Inc.
Date: February 14, 2025
Subject:
All-Way Stop-control Warrant at John Muir Parkway and Tioga Loop and John Muir Parkway and Yosemite Place-Tsushima Street, Hercules, CA Kimley-Horn and Associates, Inc. (Kimley-Horn) is working with the City of Hercules (City) to evaluate the installation of multi-way stop-control at the intersections of John Muir Parkway and Tioga Loop and John Muir Parkway and Yosemite Place-Tsushima Street. The evaluation is being completed due to concerns with limited intersection sight distance caused by horizontal curves and on-street parking along John Muir Parkway, as well as the difficulty in crossing or turning onto John Muir Parkway due to the high number of through vehicles travelling along John Muir Parkway.
Both intersections currently operate as side-street stop-controlled with a stop-control on the southbound approach of Tioga Loop and southbound and northbound approaches of Yosemite Place and Tsushima Street, respectively. There is a horizontal curve between Tioga Loop and Yosemite Place-Tsushima Street which potentially limits the intersection sight distance for vehicles exiting both intersections. On-street parking is allowed on the north side and on the south side of John Muir Parkway, near the intersection, which reduces the intersection sight distance available for vehicles exiting Yosemite Place and Tsushima Street. The intersection is located near uses that generate pedestrian activity, including retail and recreational trails to the west and residential on the north.
These uses increase pedestrian activity at the study intersections during the peak periods. The goal of this study is to enhance the overall safety of the intersection by implementing a multi-way stop- control or recommending other measures to improve the overall intersection operations if a multi-way stop-control is not warranted. As a result, a multi-way stop sign warrant analysis and sight distance analysis were conducted at the intersections of John Muir Parkway and Tioga Loop and John Muir Parkway and Yosemite Place-Tsushima Street to determine the proposed measures that should be implemented at each study intersection.
DATA COLLECTION AND METHODOLOGY
Roadway volumes were collected for twenty-four (24) hours on Thursday, November 14 th, 2024 between Tioga Loop and Yosemite Place-Tsushima Street, and roadway and speed volumes at the remaining legs of both intersections were collected on Thursday, January 9 th and Saturday, January 11th, 2025 for twenty-four (24) hours. Intersection turning movement volumes were also collected on Thursday, January 9 th, 2025 during the AM peak period from 7:00 AM to 9:00 AM and PM peak
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 period from 4:00 PM to 6:00 PM. Additionally, pedestrian and bicycle counts were collected at both intersections on Thursday, January 9th, 2025 between 9:00 AM and 4:00 PM, and Saturday, January 11th, 2025, from 7:00 AM to 6:00 PM. All counts were collected while the schools were in session and avoided inclement weather. Traffic volume data is included inAttachment A.
In addition, Kimley-Horn downloaded collision data from the Transportation Injury Mapping System (TIMS) for the months between September 2021 and September 2024. It should be noted that data in TIMS was only available up to quarter 3 of 2024 at the time this study was prepared.
MULTI-WAY STOP SIGN WARRANT ANALYSIS
Utilizing the volume data and collision information collected, a multi-way stop warrant analysis was conducted based on Section 2B.07 Guidance and Option Criteria of the CA Manual on Uniform Traffic Control Devices (MUTCD) 2014 standards, described as follows:
Guidance Criteria
· A. Where traffic control signals are justified, the multi-way stop is an interim measure that can be installed quickly to control traffic while arrangements are being made for the installation of the traffic control signal.
· B. Five or more reported crashes in a 12-month period that are susceptible to correction by a multi-way stop installation. Such crashes include right-turn and left-turn collisions as well as right-angle collisions.
· C. Minimum volumes:
1. The vehicular volume entering the intersection from the major street approaches (total of both approaches) averages at least 300 vehicles per hour for any 8 hours of an average day, and
2. The combined vehicular, pedestrian, and bicycle volume entering the intersection from the minor street approaches (total of both approaches) averages at least 200 units per hour for the same 8 hours, with an average delay of minor-street vehicular traffic of at least 30 seconds per vehicle during the highest hour, but
3. If the 85 th-percentile approach speed of the major-street traffic exceeds 40 mph, the minimum vehicular volume warrants are 70 percent of the above values. · D. Where no single criterion is satisfied, but where Criteria B, C.1, and C.2 are all satisfied to 80 percent of the minimum values. Criterion C.3 is excluded from this condition.
Option Criteria – Other criteria to consider in the warrant evaluation · A. The need to control left-turn conflicts.
· B. The need to control vehicle/pedestrian conflicts near locations that generate high pedestrian volumes.
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 · C. Locations where a road user, after stopping, cannot see conflicting traffic and is not able to negotiate the intersection unless conflicting cross traffic is also required to stop
GUIDANCE CRITERIA
The following describes the evaluation of the intersection based on the Guidance Criteria. Since a traffic signal control is not planned for either study intersection, Criterion A is not applicable .
Analysis for the remaining Criteria B to D are described below.
Collisions Analysis (Criterion B)
Based on the collision data downloaded from TIMS, no collisions occurred at either study intersection from September 2021 to September 2024. Since no collisions were reported during a 12-month period that are correctable by a multi-way stop-control, both intersections do not meet Criterion B of the multi-way stop-control warrant.
Volumes Analysis (Criteria C and D)
Roadway volume and speeds were summarized and compared to the volume threshold for MUTCD Section 2B.07 Guidance Criterion C and D. Volumes collected on Thursday, November 14 th, 2024 between Tioga Loop and Yosemite Plance-Tsushima Street and on Thursday and Saturday, January 9th and January 11th 2025 for the remaining legs of both intersections were used for the analysis. The results of the vehicular volume portion of the multi-way stop warrant analysis are summarized in Tables 1 and 2. The analysis is included in Attachment C.
Criterion C.1 and C.2
At John Muir Parkway and Tioga Loop, as shown in Table 1, the major street volume (John Muir Parkway) results in a highest 8-hour average volume of 183 vehicles per hour (vph) and the minor street volume (Tioga Loop) results in a corresponding 8-hour average volume of 21 units per hour during the weekday. On Saturday, the major street volume results in a highest 8-hour average volume of 193 vehicles per hour (vph) and the minor street volume results in a corresponding 8-hour average volume of 2 units per hour. Since the intersection does not meet the threshold volume for Criterion C.2 with a minor street threshold volume of 200 units, the intersection does not meet Criteria C.2.
At John Muir Parkway and Yosemite Place-Tsushima Street, as shown in Table 2, the major street volume (John Muir Parkway) results in a highest 8-hour average volume of 250 vehicles per hour (vph) and the minor street volume (Yosemite Place-Tsushima Street) results in a corresponding 8- hour average volume of 72 units per hour during the weekday. On Saturday, the major street volume result in a highest 8-hour volume of 243 vehicles per hour (vph) and the minor street volume results in a corresponding 8-hour average of 76 units per hour. Since the intersection does not meet the threshold volume for Criterion C.2 with a minor street threshold volume of 200 units, the intersection does not meet Criteria C.2.
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 Criterion C.3
The posted speed limit on John Muir Parkway is 25 mph. The speed data collected at each leg of the intersection showed that the 85 th percentile speed for the eastbound and westbound directions on John Muir Parkway is 34-36 mph at the two intersections. Since the 85 th percentile speeds for both legs do not exceed 40 mph, the intersection does not meet Criterion C.3 to reduce the volume thresholds by 70 percent of the above values.
Criterion D
To meet the 80 percent threshold volume for Criterion D, all study intersections would need to meet 80 percent of the thresholds within Criteria B, C.1, and C.2. For Criterion B, this would result in a threshold of at least 4 or more reported collisions within a 12-month period that are susceptible to correction by a multi-way stop-control. For Criteria C.1 and C.2, this would result in a threshold of 240 vph and 160 units per hour for the major street and minor street respectively. Based on the collision and volume results described above, both intersections do not meet either the collision nor major volume thresholds and therefore does not meet Criterion D.
A multi-way stop-control is not recommended at either intersection based on the volume and collision thresholds for Section 2B.07 Guidance Criteria of the CA MUTCD.
Table 1 – Multi-way Stop Warrant Analysis Summary – John Muir Parkway and Tioga Loop Criterion
Intersection John Muir Parkway and Tioga Loop
Approach Major Street – John Muir
Parkway
Minor Street – Tioga
Loop
Guidance A Multi-way stop as an interim measure for
traffic signal? No
Guidance B At least 5 collisions within 12 months
correctable by a multi-way stop
No
No collisions from September 2021 to September 2024
Highest 8-hour Average Volume Weekday: 183 veh/hr
Saturday: 193 veh/hr
Weekday: 21 units/hr
Saturday: 20 units/hr
Guidance
C.1 and C.2
MUTCD Threshold Met?
Major Street – 300 veh/hr
Minor Street – 200 units/hr
No No
Avg Delay of Minor Street at least 30 secs? Not Analyzed* Meets Criterion C.1 and C.2 to warrant a multi-way stop? No Guidance
C.3
Reduce Guidance C.1 and C.2 by 70% if
major street exceeds 40 mph?
No
EB/WB 85th percentile speed on major street – 34-37
mph
Guidance D 80% of Guidance B, C.1 and C.2 met? No – Collisions and major street volumes not met Note: EB = Eastbound; WB = Westbound; Units per hour = total vehicle, pedestrian, and bicycle volumes per hour. *Minor street average delay was only analyzed if both the major and minor street threshold was met for the entire intersection.
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 Table 2 – Multi-way Stop Warrant Analysis Summary – John Muir Parkway and Yosemite Place-Tsushima Street
Criterion
Intersection John Muir Parkway and Yosemite Place-Tsushima Street
Approach Major Street – John Muir
Parkway
Minor Street – Yosemite
Place-Tsushima Street
Guidance A Multi-way stop as an interim measure for
traffic signal? No
Guidance B At least 5 collisions within 12 months
correctable by a multi-way stop
No
No collisions from September 2021 to September 2024
Highest 8-hour Average Volume Weekday: 250 veh/r
Saturday: 243 veh/hr
Weekday: 72 units/hr
Saturday: 76 units/hr
Guidance
C.1 and C.2
MUTCD Threshold Met?
Major Street – 300 veh/hr
Minor Street – 200 units/hr
No No
Avg Delay of Minor Street at least 30 secs? Not Analyzed* Meets Criterion C.1 and C.2 to warrant a multi-way stop? No Guidance
C.3
Reduce Guidance C.1 and C.2 by 70% if
major street exceeds 40 mph?
No
EB/WB 85th percentile speed on major street – 34-37
mph
Guidance D 80% of Guidance B, C.1 and C.2 met? No – Collisions and major street volumes not met Note: EB = Eastbound; WB = Westbound; Units per hour = total vehicle, pedestrian, and bicycle volumes per hour. *Minor street average delay was only analyzed if both the major and minor street threshold was met for the entire intersection.
OPTION CRITERIA
The following describes the evaluation of the intersection based on the Guidance Criteria. These are based on the following field observations conducted during the peak periods:
· During the AM peak period, numerous left turns were observed in and out of Tsushima Street · No queueing was observed
· Despite the presence of parked vehicles, sight distance on minor street approaches appeared adequate
· Few pedestrians were observed in the field
Option Criterion A – Left-Turn Conflicts
Left turns were not observed at Tioga Loop during the field review. Numerous vehicles were observed making left turns at Tsushima Street during the field review. No queues were observed and vehicles did not appear to have any difficulty turning northbound or westbound left. Left-turning vehicles did not appear to experience excessive delay. Based on the field observations, Option Criterion A is not satisfied.
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 Option Criterion B – Vehicle and Pedestrian Conflicts
Few pedestrians were observed during the field visit and only one (1) was observed crossing John Muir Parkway at Tsushima Street. Additionally, based on the collected pedestrian counts, there appears to be few pedestrians crossing John Muir Parkway at both intersections. Based on the field observations and counts, Option Criterion B is not satisfied.
Option Criterion C – Sight Distance
To determine if vehicles traveling along Tioga Loop and Yosemite Place-Tsushima Street have adequate sight distance to observe conflicting traffic along John Muir Parkway, intersection sight triangles for both intersections were developed following methodology from the American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highway and Street, 7 th Edition . Based on the AASHTO sight distance criteria, aerial images, and field observations, the intersection sight distance was evaluated for the minor street approach to determine if there were visual obstructions to vehicles making a left-turn and right-turn from Tioga Loop and from Yosemite Place-Tsushima Street.
Methodology
Speed data for each approach of the intersection was collected on Thursday, November 14 th, 2024 between Tioga Loop and Yosemite Plance-Tsushima Street and Thursday and Saturday, January 9 th and January 11th 2025 at the remaining locations. The major road of John Muir Parkway has an 85 th percentile speed of 34-37 mph in the eastbound and westbound directions. However, the posted speed limit is 25 mph. Therefore, a design speed of 35 mph (or 10 mph added to the posted speed limit) was used. Using these inputs, AASHTO sight distance criteria is 335 feet for vehicles making a right-turn from the minor road (observing the major road to the left) and 390 feet for vehicles making a left-turn from the minor road (observing the major road to the right). Based on AASHTO, the decision point (or setback) for the minor road vehicle should be 14.5 feet from the edge of the major road’s traveled way. However, based on field observations, a vehicle can be positioned less than 14.5 feet from the edge of the major road’s traveled way. AASHTO states that the distance from the front of a vehicle to the driver’s seat is 8 feet. Therefore, a setback of 8 feet from the travel way was used for the analysis.
Analysis
The available sight distance exhibits are illustrated in Attachments D.1, D.2, and D.3, which show the required and available intersection sight distance, as well as obstructions within the sight triangles. The available sight distance was determined in the field and is based on the conditions at the time field work was conducted, which include the number of vehicles parked on-street.
As shown in Attachment D.1, there are no sight distance constraints at John Muir Parkway and Tioga Loop.
As shown in Attachment D.2, on-street parking on the north side of John Muir Parkway to the west and east of Yosemite Place-Tsushima Street resulted in limited sight distance at this intersection for vehicles turning from southbound Yosemite Place. Even with vehicles inching forward after stopping at the stop bar, the sight distance is limited. It should be noted that since the sight distance is
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 primarily impacted by the on-street parking on John Muir Parkway, the observed sight distance in the field may change if there are no parked vehicles on John Muir Parkway.
Field observations were conducted in January, when there was less tree foliage. As such, the trees in the median were not a constraint to sight distance. Even if field observations were conducted during another season when tree foliage was full, it is likely that there would be sufficient sight distance due to the height of the trees, gaps between the trees, and tree trunk size.
The intersection sight distance results are also summarized inTable 3.
Table 3 – Sight Distance Analysis
Setback Category
John Muir Parkway & Tioga Loop John Muir Parkway & Yosemite Place- Tsushima Street
Left-Turn Right-Turn Left-Turn Right-Turn
Looking right
from decision
point
Looking left
from decision
point
Looking left
from decision
point
Looking right
from decision
point
Looking left
from decision
point
Looking left
from decision
point
Required sight distance
for 35 mph design speed 390 ft 335 ft 335 ft 390 ft 335 ft 335 ft South Leg Of Intersection (Northbound)
8 ft from
travel
way
Available* 460 ft 415 ft 415 ft
Acceptable? Yes Yes Yes
Obstruction None None Non
North Leg Of Intersection (Southbound)
8 ft from
travel
way
Available* 620 ft 815 ft 815 ft 425 ft 225 ft 225 ft
Acceptable? Yes Yes Yes Yes No No
Obstruction None None Non None Parking Parking
*Available intersection sight distance may vary depending on the number of vehicles parked on-street and therefore may be greater or less than that presented in this table.
As shown in the Table 3 and Attachment C of the sight distance analysis, southbound vehicles on Yosemite Place have inadequate sight distance to observe westbound vehicles on John Muir Parkway due to the on-street parking. All other movements at both intersections have adequate sight distance to observe vehicles on John Muir Parkway.
Option Criterion C is not satisfied at John Muir Parkway and Tioga Loop.
Since there is a lack of sight distance for southbound vehicles on Yosemite Place to observe westbound vehicles on John Muir Parkway, Option Criterion C is satisfied for John Muir Parkway and Yosemite Place-Tsushima Street.
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840
RECOMMENDATIONS
Since no criteria was satisfied at John Muir Parkway and Tioga Loop, an all-way stop-control is not recommended to be installed at the intersection.
Option Criterion C was the only criterion satisfied at John Muir Parking and Yosemite Place-Tsushima Street for southbound vehicles at Yosemite Place due to the presence of on-street parking. Since none of the other criteria were satisfied at this intersection, an all-way stop-control is not recommended to be installed at the intersection.
CONCLUSIONS
The intersection of John Muir Parkway and Tioga Loop does not meet any of the Guidance Criteria in the CA MUTCD Multi-Stop Warrant. The intersection of John Muir Parkway and Yosemite Place- Tsushima Street only meets Option Criterion C of the MTUCD due to the inadequate sight distance for southbound vehicles on Yosemite Place to observe westbound vehicles along John Muir Parkway due to on-street parking. Therefore, an all-way stop-control is not recommended at either intersection.
The following measures are recommended at John Muir Parkway and Yosemite Place-Tsushima Street to address the sight distance issue:
· Recommend installing approximately 50’ of red striping from the curb return at the near side of Yosemite Place to remove about 2 on-street parking spots. This would provide a new sight distance of approximately 390 feet which would meet the required 335 ft sight distance requirement
Additional measures the City can consider include the following:
· Narrowing widths of existing vehicle lanes. This is an effective measure which could reduce vehicle speeds which would then address the sight distance concern at John Muir Parkway and Yosemite Place-Tsushima Street. The additional space from the reduced vehicle lane could be used to stripe buffered bike lanes.
· Installing speed humps. This is also an effective measure to reduce vehicle speeds. John Muir Parkway is a good candidate given the posted speed limit and existing ADTs. Things to consider include possible increases in noise and slow down response time to emergency vehicles.
· Installing pedestrian signage. John Muir Parkway and Yosemite Place-Tsushima Street has crosswalks on the east and west legs but no pedestrian signage. Pedestrian signage can augment driver awareness and enhance safety for pedestrians crossing the crosswalks.
Signs that could be installed include pedestrian crossing signs (W11-2) at the crosswalks to warn drivers of crossing pedestrians, yield to pedestrians signs (R1-5) in conjunction with yield lines to direct drivers where to yield to crossing pedestrians, and an in-street pedestrian crossing signs (R1-6) to remind drivers that pedestrians have right-of-way when crossing the
kimley-horn.com 4637 Chabot Dr., Suite 300, Pleasanton, CA 94588 925-398-4840 street. A rectangular rapid flashing beacon (RRFB) could be considered at the intersection to increase pedestrian visibility, however at this time it is not recommended given the low pedestrian volumes and existing speed limit based upon the guidelines outlined in the Federal Highway Administration (FHWA) Field Guide for Selecting Countermeasures at Uncontrolled Pedestrians Crossing Locations.
Sincerely,
Clara Ho, P.E.
California Professional Engineer #C90344
Attachments:
Attachment A – 24-Hour Counts, Turning Movement Counts, and Speed Data Attachment B – Multi-way Stop Warrant Analysis
Attachment C – Sight Distance Exhibits
Location: John Muir Pkwy, Between Alfred Nobel Dr & Bayfront Blvd Date Range: 11/14/2024 - 11/20/2024
Site Code: 04
EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total 12:00 AM 7 8 15 - - - - - - - - - - - - - - - - - - 7 8 15 1:00 AM 3 3 6 - - - - - - - - - - - - - - - - - - 3 3 6 2:00 AM 4 2 6 - - - - - - - - - - - - - - - - - - 4 2 6 3:00 AM 3 2 5 - - - - - - - - - - - - - - - - - - 3 2 5 4:00 AM 17 2 19 - - - - - - - - - - - - - - - - - - 17 2 19 5:00 AM 50 5 55 - - - - - - - - - - - - - - - - - - 50 5 55 6:00 AM 58 16 74 - - - - - - - - - - - - - - - - - - 58 16 74 7:00 AM 137 33 170 - - - - - - - - - - - - - - - - - - 137 33 170 8:00 AM 111 65 176 - - - - - - - - - - - - - - - - - - 111 65 176 9:00 AM 85 49 134 - - - - - - - - - - - - - - - - - - 85 49 134 10:00 AM 72 48 120 - - - - - - - - - - - - - - - - - - 72 48 120 11:00 AM 74 66 140 - - - - - - - - - - - - - - - - - - 74 66 140 12:00 PM 95 75 170 - - - - - - - - - - - - - - - - - - 95 75 170 1:00 PM 80 73 153 - - - - - - - - - - - - - - - - - - 80 73 153 2:00 PM 88 52 140 - - - - - - - - - - - - - - - - - - 88 52 140 3:00 PM 94 104 198 - - - - - - - - - - - - - - - - - - 94 104 198 4:00 PM 97 120 217 - - - - - - - - - - - - - - - - - - 97 120 217 5:00 PM 82 124 206 - - - - - - - - - - - - - - - - - - 82 124 206 6:00 PM 79 86 165 - - - - - - - - - - - - - - - - - - 79 86 165 7:00 PM 78 91 169 - - - - - - - - - - - - - - - - - - 78 91 169 8:00 PM 42 61 103 - - - - - - - - - - - - - - - - - - 42 61 103 9:00 PM 33 60 93 - - - - - - - - - - - - - - - - - - 33 60 93 10:00 PM 30 31 61 - - - - - - - - - - - - - - - - - - 30 31 61 11:00 PM 13 20 33 - - - - - - - - - - - - - - - - - - 13 20 33 Total 1,432 1,196 2,628 - - - - - - - - - - - - - - - - - - 1,432 1,196 2,628 Percent 54% 46% - - - - - - - - - - - - 54% 46%
AM Peak 07:00 11:00 08:00 - - - - - - - - - - - - - - - - - - 07:00 11:00 08:00 Vol. 137 66 176 - - - - - - - - - - - - - - - - - - 137 66 176 PM Peak 16:00 17:00 16:00 - - - - - - - - - - - - - - - - - - 16:00 17:00 16:00 Vol. 97 124 217 - - - - - - - - - - - - - - - - - - 97 124 217
1. Mid-week average includes data between Tuesday and Thursday.
Time
Thursday Friday Saturday Sunday Monday Tuesday Wednesday Mid-Week Average11/20/202411/14/2024 11/15/2024 11/16/2024 11/17/2024 11/18/2024 11/19/2024 1 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Direction: Eastbound / Westbound
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + 2 10 77 458 1,071 950 278 52 2 0 1 0 0 0 0 0 0
0.1% 0.3% 2.7% 15.8% 36.9% 32.7% 9.6% 1.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 12 28 335 912 831 289 41 3 1 0 0 0 0 0 0 0
0.0% 0.5% 1.1% 13.7% 37.2% 33.9% 11.8% 1.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2 22 105 793 1,983 1,781 567 93 5 1 1 0 0 0 0 0 0
0.0% 0.4% 2.0% 14.8% 37.0% 33.3% 10.6% 1.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.3 mph Mean (Average) Speed 29.3 mph
34.2 mph 10 mph Pace 24.5 - 34.5 mph
37.4 mph Percent in Pace 70.5 %
50th Percentile (Median) 29.6 mph Mean (Average) Speed 29.8 mph
34.7 mph 10 mph Pace 24.6 - 34.6 mph
37.8 mph Percent in Pace 71.5 %
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Total Study Percentile Speed Summary Total Study Speed Statistics 85th Percentile
5,353
2,452
2,901
WestboundWestbound
EastboundEastbound
Total
Westbound
Eastbound
Total
VolumeDirection
Speed Range (mph)
95th Percentile
1 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 1 2 2 1 1 0 0 0 0 0 0 0 0 0 0 7
1:00 AM 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 0 0 1 1 2 0 1 0 0 0 0 0 0 0 0 0 5
4:00 AM 0 0 0 1 3 8 8 2 0 0 0 0 0 0 0 0 0 22
5:00 AM 0 0 0 3 14 13 6 1 1 0 0 0 0 0 0 0 0 38
6:00 AM 0 0 1 5 12 30 13 3 0 0 0 0 0 0 0 0 0 64
7:00 AM 0 0 1 12 40 62 23 3 0 0 0 0 0 0 0 0 0 141
8:00 AM 0 0 1 17 33 31 10 1 0 0 0 0 0 0 0 0 0 93
9:00 AM 0 0 7 19 35 21 7 2 0 0 0 0 0 0 0 0 0 91
10:00 AM 0 0 2 12 30 15 7 0 0 0 0 0 0 0 0 0 0 66
11:00 AM 0 1 2 7 25 35 11 2 0 0 0 0 0 0 0 0 0 83
12:00 PM 2 0 4 9 29 37 12 3 0 0 0 0 0 0 0 0 0 96
1:00 PM 0 1 2 10 36 27 13 1 0 0 0 0 0 0 0 0 0 90
2:00 PM 0 0 1 16 25 39 10 4 0 0 0 0 0 0 0 0 0 95
3:00 PM 0 0 2 13 32 34 5 2 0 0 0 0 0 0 0 0 0 88
4:00 PM 0 0 3 21 43 34 7 0 0 0 0 0 0 0 0 0 0 108
5:00 PM 0 0 2 18 37 26 1 1 0 0 0 0 0 0 0 0 0 85
6:00 PM 0 0 3 22 41 15 5 0 0 0 0 0 0 0 0 0 0 86
7:00 PM 0 0 2 10 17 22 6 1 0 0 0 0 0 0 0 0 0 58
8:00 PM 0 0 3 14 22 19 4 0 0 0 0 0 0 0 0 0 0 62
9:00 PM 0 1 0 7 9 11 5 1 0 0 0 0 0 0 0 0 0 34
10:00 PM 0 0 1 5 14 7 4 1 0 0 0 0 0 0 0 0 0 32
11:00 PM 0 0 0 1 6 4 2 1 0 0 0 0 0 0 0 0 0 14
2 3 39 226 508 493 160 31 1 0 0 0 0 0 0 0 0
0.1% 0.2% 2.7% 15.4% 34.7% 33.7% 10.9% 2.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.6 mph Mean (Average) Speed 29.5 mph 85th Percentile 34.6 mph 10 mph Pace mph
95th Percentile 37.6 mph Percent in Pace 68.6 %
Thursday, January 9, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
24.3 - 34.3
Time
1,463Total
2 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 2 4 5 0 0 0 0 0 0 0 0 0 0 0 11
1:00 AM 0 0 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 3
2:00 AM 0 0 0 2 1 1 1 0 0 0 0 0 0 0 0 0 0 5
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 3
6:00 AM 0 0 0 2 6 5 0 0 0 0 0 0 0 0 0 0 0 13
7:00 AM 0 0 0 2 13 3 3 1 0 0 0 0 0 0 0 0 0 22
8:00 AM 0 0 0 20 16 20 9 1 0 0 0 0 0 0 0 0 0 66
9:00 AM 0 1 0 13 27 14 6 0 0 0 0 0 0 0 0 0 0 61
10:00 AM 0 1 0 11 16 15 6 1 0 0 0 0 0 0 0 0 0 50
11:00 AM 0 1 0 5 24 19 6 0 0 0 0 0 0 0 0 0 0 55
12:00 PM 0 0 1 8 33 18 13 2 0 0 0 0 0 0 0 0 0 75
1:00 PM 0 1 0 11 21 28 11 1 1 0 0 0 0 0 0 0 0 74
2:00 PM 0 1 0 7 26 30 19 3 0 0 0 0 0 0 0 0 0 86
3:00 PM 0 0 2 6 36 53 11 6 0 0 0 0 0 0 0 0 0 114
4:00 PM 0 1 2 16 39 36 19 1 0 0 0 0 0 0 0 0 0 114
5:00 PM 0 0 3 14 48 41 14 1 0 0 0 0 0 0 0 0 0 121
6:00 PM 0 0 0 17 41 30 8 2 0 0 0 0 0 0 0 0 0 98
7:00 PM 0 0 1 8 47 30 8 2 0 0 0 0 0 0 0 0 0 96
8:00 PM 0 0 0 10 20 21 1 0 0 0 0 0 0 0 0 0 0 52
9:00 PM 0 0 1 4 18 17 4 2 0 0 0 0 0 0 0 0 0 46
10:00 PM 0 0 0 5 10 9 7 0 0 0 0 0 0 0 0 0 0 31
11:00 PM 0 0 0 2 10 7 3 0 0 0 0 0 0 0 0 0 0 22
0 6 10 166 459 404 150 23 1 0 0 0 0 0 0 0 0
0.0% 0.5% 0.8% 13.6% 37.7% 33.1% 12.3% 1.9% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.6 mph Mean (Average) Speed 29.9 mph 85th Percentile 34.9 mph 10 mph Pace mph
95th Percentile 37.8 mph Percent in Pace 71.53 %
Thursday, January 9, 2025
Speed Range (mph)Time
1,219Total
Daily Percentile Speed Summary Speed Statistics
24.8 - 34.8
3 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 1 0 0 8 5 1 0 0 0 0 0 0 0 0 0 0 15
1:00 AM 0 0 0 1 4 3 2 0 0 0 0 0 0 0 0 0 0 10
2:00 AM 0 0 0 1 2 2 1 0 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 0 0 0 3 1 0 0 0 0 0 0 0 0 0 0 0 4
4:00 AM 0 0 0 2 4 3 2 0 0 0 0 0 0 0 0 0 0 11
5:00 AM 0 0 0 1 2 5 1 2 1 0 0 0 0 0 0 0 0 12
6:00 AM 0 0 0 1 9 9 4 1 0 0 0 0 0 0 0 0 0 24
7:00 AM 0 0 0 6 15 8 7 2 0 0 0 0 0 0 0 0 0 38
8:00 AM 0 0 3 11 21 26 8 0 0 0 0 0 0 0 0 0 0 69
9:00 AM 0 0 2 4 35 35 15 1 0 0 0 0 0 0 0 0 0 92
10:00 AM 0 0 1 13 40 34 11 5 0 0 0 0 0 0 0 0 0 104
11:00 AM 0 2 1 19 32 38 7 0 0 0 0 0 0 0 0 0 0 99
12:00 PM 0 0 3 17 47 38 9 1 0 0 0 0 0 0 0 0 0 115
1:00 PM 0 0 1 17 47 46 8 2 0 0 0 0 0 0 0 0 0 121
2:00 PM 0 0 8 21 42 41 7 1 0 0 0 0 0 0 0 0 0 120
3:00 PM 0 0 5 22 36 31 7 0 0 0 0 0 0 0 0 0 0 101
4:00 PM 0 2 1 17 47 24 7 1 0 0 0 0 0 0 0 0 0 99
5:00 PM 0 0 8 34 51 29 5 0 0 0 0 0 0 0 0 0 0 127
6:00 PM 0 0 1 18 39 25 3 0 0 0 0 0 0 0 0 0 0 86
7:00 PM 0 0 1 12 24 7 4 0 0 0 0 0 0 0 0 0 0 48
8:00 PM 0 0 2 7 25 22 4 0 0 0 0 0 0 0 0 0 0 60
9:00 PM 0 2 0 3 12 13 2 2 0 0 0 0 0 0 0 0 0 34
10:00 PM 0 0 0 2 15 5 2 1 0 0 1 0 0 0 0 0 0 26
11:00 PM 0 0 1 3 3 7 1 2 0 0 0 0 0 0 0 0 0 17
0 7 38 232 563 457 118 21 1 0 1 0 0 0 0 0 0
0.0% 0.5% 2.6% 16.1% 39.2% 31.8% 8.2% 1.5% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.1 mph Mean (Average) Speed 29.1 mph 85th Percentile 33.9 mph 10 mph Pace mph
95th Percentile 37.2 mph Percent in Pace 72.6 %
Saturday, January 11, 2025
Speed Range (mph)Time
Total 1,438
Daily Percentile Speed Summary Speed Statistics
24.4 - 34.4
4 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 1 10 12 3 0 0 0 0 0 0 0 0 0 0 26
1:00 AM 0 0 0 4 3 3 1 0 0 0 0 0 0 0 0 0 0 11
2:00 AM 0 0 0 1 3 3 0 0 0 0 0 0 0 0 0 0 0 7
3:00 AM 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 0 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 3
6:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 0 0 0 3 7 4 4 0 0 0 0 0 0 0 0 0 0 18
8:00 AM 0 0 0 0 8 13 7 2 0 0 0 0 0 0 0 0 0 30
9:00 AM 0 0 0 8 20 23 2 3 1 0 0 0 0 0 0 0 0 57
10:00 AM 0 1 0 5 22 23 4 1 0 0 0 0 0 0 0 0 0 56
11:00 AM 0 0 2 12 38 33 15 1 0 0 0 0 0 0 0 0 0 101
12:00 PM 0 1 3 14 28 34 11 0 0 1 0 0 0 0 0 0 0 92
1:00 PM 0 0 1 15 35 38 15 2 0 0 0 0 0 0 0 0 0 106
2:00 PM 0 2 2 10 24 33 11 2 0 0 0 0 0 0 0 0 0 84
3:00 PM 0 1 1 9 33 44 16 4 1 0 0 0 0 0 0 0 0 109
4:00 PM 0 0 0 22 43 20 12 1 0 0 0 0 0 0 0 0 0 98
5:00 PM 0 0 5 12 39 33 10 1 0 0 0 0 0 0 0 0 0 100
6:00 PM 0 0 1 13 35 29 9 0 0 0 0 0 0 0 0 0 0 87
7:00 PM 0 1 0 12 31 15 4 0 0 0 0 0 0 0 0 0 0 63
8:00 PM 0 0 2 11 22 32 6 0 0 0 0 0 0 0 0 0 0 73
9:00 PM 0 0 1 11 23 15 3 1 0 0 0 0 0 0 0 0 0 54
10:00 PM 0 0 0 4 15 13 2 0 0 0 0 0 0 0 0 0 0 34
11:00 PM 0 0 0 1 10 6 1 0 0 0 0 0 0 0 0 0 0 18
0 6 18 169 453 427 139 18 2 1 0 0 0 0 0 0 0
0.0% 0.5% 1.5% 13.7% 36.7% 34.6% 11.3% 1.5% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.8 mph Mean (Average) Speed 29.7 mph 85th Percentile 34.7 mph 10 mph Pace mph
95th Percentile 37.8 mph Percent in Pace 71.7 %
Time
Total 1,233
24.6 - 34.6
Saturday, January 11, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
5 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 1 1 1 5 3 1 0 0 0 0 0 0 0 0 0 0 12
1:00 AM 0 0 0 1 2 2 1 1 0 0 0 0 0 0 0 0 0 7
2:00 AM 0 0 1 1 2 1 1 0 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 0 0 1 2 2 0 1 0 0 0 0 0 0 0 0 0 6
4:00 AM 0 0 0 2 4 6 5 1 0 0 0 0 0 0 0 0 0 18
5:00 AM 0 0 0 2 8 9 4 2 1 0 0 0 0 0 0 0 0 26
6:00 AM 0 0 1 3 11 20 9 2 0 0 0 0 0 0 0 0 0 46
7:00 AM 0 0 1 9 28 35 15 3 0 0 0 0 0 0 0 0 0 91
8:00 AM 0 0 2 14 27 29 9 1 0 0 0 0 0 0 0 0 0 82
9:00 AM 0 0 5 12 35 28 11 2 0 0 0 0 0 0 0 0 0 93
10:00 AM 0 0 2 13 35 25 9 3 0 0 0 0 0 0 0 0 0 87
11:00 AM 0 2 2 13 29 37 9 1 0 0 0 0 0 0 0 0 0 93
12:00 PM 1 0 4 13 38 38 11 2 0 0 0 0 0 0 0 0 0 107
1:00 PM 0 1 2 14 42 37 11 2 0 0 0 0 0 0 0 0 0 109
2:00 PM 0 0 5 19 34 40 9 3 0 0 0 0 0 0 0 0 0 110
3:00 PM 0 0 4 18 34 33 6 1 0 0 0 0 0 0 0 0 0 96
4:00 PM 0 1 2 19 45 29 7 1 0 0 0 0 0 0 0 0 0 104
5:00 PM 0 0 5 26 44 28 3 1 0 0 0 0 0 0 0 0 0 107
6:00 PM 0 0 2 20 40 20 4 0 0 0 0 0 0 0 0 0 0 86
7:00 PM 0 0 2 11 21 15 5 1 0 0 0 0 0 0 0 0 0 55
8:00 PM 0 0 3 11 24 21 4 0 0 0 0 0 0 0 0 0 0 63
9:00 PM 0 2 0 5 11 12 4 2 0 0 0 0 0 0 0 0 0 36
10:00 PM 0 0 1 4 15 6 3 1 0 0 1 0 0 0 0 0 0 31
11:00 PM 0 0 1 2 5 6 2 2 0 0 0 0 0 0 0 0 0 18
1 7 46 234 541 482 143 33 1 0 1 0 0 0 0 0 0
0.1% 0.5% 3.1% 15.7% 36.3% 32.4% 9.6% 2.2% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 29.3 mph Mean (Average) Speed 29.3 mph 85th Percentile 34.2 mph 10 mph Pace 24.5 - 34.5 mph 95th Percentile 37.4 mph Percent in Pace 70.5 %
Total Study Average
Time
Total 1,489
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics 6 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 to 1/11/2025
Site Code: 01
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 2 7 9 2 0 0 0 0 0 0 0 0 0 0 20
1:00 AM 0 0 0 2 3 2 1 0 0 0 0 0 0 0 0 0 0 8
2:00 AM 0 0 0 2 2 2 1 0 0 0 0 0 0 0 0 0 0 7
3:00 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 4
6:00 AM 0 0 0 2 4 3 0 0 0 0 0 0 0 0 0 0 0 9
7:00 AM 0 0 0 3 10 4 4 1 0 0 0 0 0 0 0 0 0 22
8:00 AM 0 0 0 10 12 17 8 2 0 0 0 0 0 0 0 0 0 49
9:00 AM 0 1 0 11 24 19 4 2 1 0 0 0 0 0 0 0 0 62
10:00 AM 0 1 0 8 19 19 5 1 0 0 0 0 0 0 0 0 0 53
11:00 AM 0 1 1 9 31 26 11 1 0 0 0 0 0 0 0 0 0 80
12:00 PM 0 1 2 11 31 26 12 1 0 1 0 0 0 0 0 0 0 85
1:00 PM 0 1 1 13 28 33 13 2 1 0 0 0 0 0 0 0 0 92
2:00 PM 0 2 1 9 25 32 15 3 0 0 0 0 0 0 0 0 0 87
3:00 PM 0 1 2 8 35 49 14 5 1 0 0 0 0 0 0 0 0 115
4:00 PM 0 1 1 19 41 28 16 1 0 0 0 0 0 0 0 0 0 107
5:00 PM 0 0 4 13 44 37 12 1 0 0 0 0 0 0 0 0 0 111
6:00 PM 0 0 1 15 38 30 9 1 0 0 0 0 0 0 0 0 0 94
7:00 PM 0 1 1 10 39 23 6 1 0 0 0 0 0 0 0 0 0 81
8:00 PM 0 0 1 11 21 27 4 0 0 0 0 0 0 0 0 0 0 64
9:00 PM 0 0 1 8 21 16 4 2 0 0 0 0 0 0 0 0 0 52
10:00 PM 0 0 0 5 13 11 5 0 0 0 0 0 0 0 0 0 0 34
11:00 PM 0 0 0 2 10 7 2 0 0 0 0 0 0 0 0 0 0 21
0 10 16 174 460 422 150 24 3 1 0 0 0 0 0 0 0
0.0% 0.8% 1.3% 13.8% 36.5% 33.5% 11.9% 1.9% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 29.6 mph Mean (Average) Speed 29.8 mph 85th Percentile 34.7 mph 10 mph Pace 24.6 - 34.6 mph 95th Percentile 37.8 mph Percent in Pace 71.5 %
Total Study Percentile Speed Summary Total Study Speed Statistics Time
Total 1,260
Total Study Average
Speed Range (mph)
7 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, W/O Tioga Loop
Date Range: 1/9/2025 - 1/15/2025
Site Code: 01
EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total 12:00 AM 7 11 18 - - - 15 26 41 - - - - - - - - - - - - 7 11 18 1:00 AM 2 3 5 - - - 10 11 21 - - - - - - - - - - - - 2 3 5 2:00 AM 3 5 8 - - - 6 7 13 - - - - - - - - - - - - 3 5 8 3:00 AM 5 0 5 - - - 4 2 6 - - - - - - - - - - - - 5 0 5 4:00 AM 22 1 23 - - - 11 2 13 - - - - - - - - - - - - 22 1 23 5:00 AM 38 3 41 - - - 12 3 15 - - - - - - - - - - - - 38 3 41 6:00 AM 64 13 77 - - - 24 2 26 - - - - - - - - - - - - 64 13 77 7:00 AM 141 22 163 - - - 38 18 56 - - - - - - - - - - - - 141 22 163 8:00 AM 93 66 159 - - - 69 30 99 - - - - - - - - - - - - 93 66 159 9:00 AM 91 61 152 - - - 92 57 149 - - - - - - - - - - - - 91 61 152 10:00 AM 66 50 116 - - - 104 56 160 - - - - - - - - - - - - 66 50 116 11:00 AM 83 55 138 - - - 99 101 200 - - - - - - - - - - - - 83 55 138 12:00 PM 96 75 171 - - - 115 92 207 - - - - - - - - - - - - 96 75 171 1:00 PM 90 74 164 - - - 121 106 227 - - - - - - - - - - - - 90 74 164 2:00 PM 95 86 181 - - - 120 84 204 - - - - - - - - - - - - 95 86 181 3:00 PM 88 114 202 - - - 101 109 210 - - - - - - - - - - - - 88 114 202 4:00 PM 108 114 222 - - - 99 98 197 - - - - - - - - - - - - 108 114 222 5:00 PM 85 121 206 - - - 127 100 227 - - - - - - - - - - - - 85 121 206 6:00 PM 86 98 184 - - - 86 87 173 - - - - - - - - - - - - 86 98 184 7:00 PM 58 96 154 - - - 48 63 111 - - - - - - - - - - - - 58 96 154 8:00 PM 62 52 114 - - - 60 73 133 - - - - - - - - - - - - 62 52 114 9:00 PM 34 46 80 - - - 34 54 88 - - - - - - - - - - - - 34 46 80 10:00 PM 32 31 63 - - - 26 34 60 - - - - - - - - - - - - 32 31 63 11:00 PM 14 22 36 - - - 17 18 35 - - - - - - - - - - - - 14 22 36 Total 1,463 1,219 2,682 - - - 1,438 1,233 2,671 - - - - - - - - - - - - 1,463 1,219 2,682 Percent 55% 45% - - 54% 46% - - - - - - - - 55% 45%
AM Peak 07:00 08:00 07:00 - - - 10:00 11:00 11:00 - - - - - - - - - - - - 07:00 08:00 07:00 Vol. 141 66 163 - - - 104 101 200 - - - - - - - - - - - - 141 66 163 PM Peak 16:00 17:00 16:00 - - - 17:00 15:00 13:00 - - - - - - - - - - - - 16:00 17:00 16:00 Vol. 108 121 222 - - - 127 109 227 - - - - - - - - - - - - 108 121 222
1. Mid-week average includes data between Tuesday and Thursday.
Time
Thursday Friday Saturday Sunday Monday Tuesday Wednesday Mid-Week Average1/15/20251/9/2025 1/10/2025 1/11/2025 1/12/2025 1/13/2025 1/14/2025 1 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Direction: Northbound / Southbound
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + 25 168 220 21 1 0 0 0 0 0 0 0 0 0 0 0 0
5.7% 38.6% 50.6% 4.8% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42 139 236 17 0 0 0 0 0 0 0 0 0 0 0 0 0
9.7% 32.0% 54.4% 3.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 67 307 456 38 1 0 0 0 0 0 0 0 0 0 0 0 0
7.7% 35.3% 52.5% 4.4% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 15.3 mph Mean (Average) Speed 15.2 mph
18.3 mph 10 mph Pace 10.5 - 20.5 mph
20.2 mph Percent in Pace 89.7 %
50th Percentile (Median) 15.5 mph Mean (Average) Speed 15.0 mph
18.2 mph 10 mph Pace 10.6 - 20.6 mph
19.8 mph Percent in Pace 88.3 %
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Total Study Percentile Speed Summary Total Study Speed Statistics 85th Percentile
869
434
435
SouthboundSouthbound
NorthboundNorthbound
Total
Southbound
Northbound
Total
VolumeDirection
Speed Range (mph)
95th Percentile
1 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
8:00 AM 1 6 14 1 0 0 0 0 0 0 0 0 0 0 0 0 0 22
9:00 AM 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
10:00 AM 0 5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
11:00 AM 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
12:00 PM 0 4 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
1:00 PM 1 2 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
2:00 PM 1 3 9 2 0 0 0 0 0 0 0 0 0 0 0 0 0 15
3:00 PM 0 13 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26
4:00 PM 1 8 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16
5:00 PM 3 8 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23
6:00 PM 1 2 16 2 0 0 0 0 0 0 0 0 0 0 0 0 0 21
7:00 PM 0 15 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 25
8:00 PM 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
9:00 PM 1 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
10:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
11:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
12 91 112 7 0 0 0 0 0 0 0 0 0 0 0 0 0
5.4% 41.0% 50.5% 3.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 15.3 mph Mean (Average) Speed 15.1 mph 85th Percentile 18.2 mph 10 mph Pace mph
95th Percentile 19.5 mph Percent in Pace 91.9 %
Thursday, January 9, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
10.0 - 20.0
Time
222Total
2 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 2 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
6:00 AM 0 1 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
7:00 AM 2 10 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
8:00 AM 3 5 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24
9:00 AM 2 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 12
10:00 AM 2 7 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17
11:00 AM 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
12:00 PM 1 6 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 14
1:00 PM 2 5 10 1 0 0 0 0 0 0 0 0 0 0 0 0 0 18
2:00 PM 0 4 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
3:00 PM 0 2 14 1 0 0 0 0 0 0 0 0 0 0 0 0 0 17
4:00 PM 1 7 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
5:00 PM 1 2 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
6:00 PM 2 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 9
7:00 PM 3 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
8:00 PM 2 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
9:00 PM 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
23 68 123 5 0 0 0 0 0 0 0 0 0 0 0 0 0
10.5% 31.1% 56.2% 2.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 15.7 mph Mean (Average) Speed 14.9 mph 85th Percentile 18.1 mph 10 mph Pace mph
95th Percentile 19.3 mph Percent in Pace 87.21 %
Thursday, January 9, 2025
Speed Range (mph)Time
219Total
Daily Percentile Speed Summary Speed Statistics
10.0 - 20.0
3 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
7:00 AM 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
8:00 AM 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
9:00 AM 0 4 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
10:00 AM 1 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 7
11:00 AM 1 8 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
12:00 PM 0 3 11 1 0 0 0 0 0 0 0 0 0 0 0 0 0 15
1:00 PM 0 7 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 13
2:00 PM 0 5 5 1 1 0 0 0 0 0 0 0 0 0 0 0 0 12
3:00 PM 1 7 9 2 0 0 0 0 0 0 0 0 0 0 0 0 0 19
4:00 PM 0 4 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
5:00 PM 7 14 8 2 0 0 0 0 0 0 0 0 0 0 0 0 0 31
6:00 PM 1 8 11 2 0 0 0 0 0 0 0 0 0 0 0 0 0 22
7:00 PM 1 5 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
8:00 PM 0 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
9:00 PM 0 5 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 10
10:00 PM 0 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 PM 1 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
13 77 108 14 1 0 0 0 0 0 0 0 0 0 0 0 0
6.1% 36.2% 50.7% 6.6% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 15.4 mph Mean (Average) Speed 15.3 mph 85th Percentile 18.8 mph 10 mph Pace mph
95th Percentile 20.4 mph Percent in Pace 89.2 %
Saturday, January 11, 2025
Speed Range (mph)Time
Total 213
Daily Percentile Speed Summary Speed Statistics
11.0 - 21.0
4 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
7:00 AM 1 2 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 9
8:00 AM 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
9:00 AM 0 3 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
10:00 AM 0 6 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 12
11:00 AM 1 3 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14
12:00 PM 1 12 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23
1:00 PM 1 4 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
2:00 PM 1 3 10 2 0 0 0 0 0 0 0 0 0 0 0 0 0 16
3:00 PM 6 4 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 20
4:00 PM 0 7 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 13
5:00 PM 4 4 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 15
6:00 PM 0 4 8 2 0 0 0 0 0 0 0 0 0 0 0 0 0 14
7:00 PM 0 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
8:00 PM 0 4 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 6
9:00 PM 0 7 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
10:00 PM 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 PM 1 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
19 71 113 12 0 0 0 0 0 0 0 0 0 0 0 0 0
8.8% 33.0% 52.6% 5.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 15.5 mph Mean (Average) Speed 15.2 mph 85th Percentile 18.3 mph 10 mph Pace mph
95th Percentile 20.0 mph Percent in Pace 89.77 %
Time
Total 215
10.6 - 20.6
Saturday, January 11, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
5 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 0 3 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 6
8:00 AM 1 5 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16
9:00 AM 0 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
10:00 AM 1 3 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 10
11:00 AM 1 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
12:00 PM 0 4 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 13
1:00 PM 1 5 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 13
2:00 PM 1 4 7 2 1 0 0 0 0 0 0 0 0 0 0 0 0 15
3:00 PM 1 10 11 1 0 0 0 0 0 0 0 0 0 0 0 0 0 23
4:00 PM 1 6 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16
5:00 PM 5 11 10 1 0 0 0 0 0 0 0 0 0 0 0 0 0 27
6:00 PM 1 5 14 2 0 0 0 0 0 0 0 0 0 0 0 0 0 22
7:00 PM 1 10 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 20
8:00 PM 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
9:00 PM 1 4 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 9
10:00 PM 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 PM 1 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
18 88 116 16 1 0 0 0 0 0 0 0 0 0 0 0 0
7.5% 36.8% 48.5% 6.7% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 15.3 mph Mean (Average) Speed 15.2 mph 85th Percentile 18.3 mph 10 mph Pace 10.5 - 20.5 mph 95th Percentile 20.2 mph Percent in Pace 89.7 %
Total Study Average
Time
Total 239
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics 6 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 02
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 1 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
6:00 AM 1 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
7:00 AM 2 6 7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16
8:00 AM 2 4 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
9:00 AM 1 2 10 1 0 0 0 0 0 0 0 0 0 0 0 0 0 14
10:00 AM 1 7 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 15
11:00 AM 1 4 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
12:00 PM 1 9 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 19
1:00 PM 2 5 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 17
2:00 PM 1 4 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 15
3:00 PM 3 3 12 1 0 0 0 0 0 0 0 0 0 0 0 0 0 19
4:00 PM 1 7 7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 16
5:00 PM 3 3 7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 14
6:00 PM 1 4 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 12
7:00 PM 2 3 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
8:00 PM 1 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 8
9:00 PM 1 4 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
10:00 PM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
11:00 PM 1 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
26 75 122 12 0 0 0 0 0 0 0 0 0 0 0 0 0
11.1% 31.9% 51.9% 5.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 15.5 mph Mean (Average) Speed 15.0 mph 85th Percentile 18.2 mph 10 mph Pace 10.6 - 20.6 mph 95th Percentile 19.8 mph Percent in Pace 88.3 %
Total Study Percentile Speed Summary Total Study Speed Statistics Time
Total 235
Total Study Average
Speed Range (mph)
7 Project Manager: (415) 310-6469
[email protected]
Location: Tioga Loop, N/O John Muir Pkwy
Date Range: 1/9/2025 - 1/15/2025
Site Code: 02
NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total 12:00 AM 4 0 4 - - - 2 0 2 - - - - - - - - - - - - 4 0 4 1:00 AM 1 0 1 - - - 0 1 1 - - - - - - - - - - - - 1 0 1 2:00 AM 1 0 1 - - - 1 2 3 - - - - - - - - - - - - 1 0 1 3:00 AM 0 0 0 - - - 1 0 1 - - - - - - - - - - - - 0 0 0 4:00 AM 1 1 2 - - - 0 2 2 - - - - - - - - - - - - 1 1 2 5:00 AM 0 7 7 - - - 1 1 2 - - - - - - - - - - - - 0 7 7 6:00 AM 4 7 11 - - - 3 5 8 - - - - - - - - - - - - 4 7 11 7:00 AM 8 22 30 - - - 2 9 11 - - - - - - - - - - - - 8 22 30 8:00 AM 22 24 46 - - - 7 5 12 - - - - - - - - - - - - 22 24 46 9:00 AM 7 12 19 - - - 11 15 26 - - - - - - - - - - - - 7 12 19 10:00 AM 9 17 26 - - - 7 12 19 - - - - - - - - - - - - 9 17 26 11:00 AM 8 8 16 - - - 16 14 30 - - - - - - - - - - - - 8 8 16 12:00 PM 9 14 23 - - - 15 23 38 - - - - - - - - - - - - 9 14 23 1:00 PM 9 18 27 - - - 13 13 26 - - - - - - - - - - - - 9 18 27 2:00 PM 15 12 27 - - - 12 16 28 - - - - - - - - - - - - 15 12 27 3:00 PM 26 17 43 - - - 19 20 39 - - - - - - - - - - - - 26 17 43 4:00 PM 16 16 32 - - - 13 13 26 - - - - - - - - - - - - 16 16 32 5:00 PM 23 11 34 - - - 31 15 46 - - - - - - - - - - - - 23 11 34 6:00 PM 21 9 30 - - - 22 14 36 - - - - - - - - - - - - 21 9 30 7:00 PM 25 11 36 - - - 13 6 19 - - - - - - - - - - - - 25 11 36 8:00 PM 5 7 12 - - - 5 6 11 - - - - - - - - - - - - 5 7 12 9:00 PM 5 4 9 - - - 10 15 25 - - - - - - - - - - - - 5 4 9 10:00 PM 2 0 2 - - - 4 4 8 - - - - - - - - - - - - 2 0 2 11:00 PM 1 2 3 - - - 5 4 9 - - - - - - - - - - - - 1 2 3 Total 222 219 441 - - - 213 215 428 - - - - - - - - - - - - 222 219 441 Percent 50% 50% - - 50% 50% - - - - - - - - 50% 50%
AM Peak 08:00 08:00 08:00 - - - 11:00 09:00 11:00 - - - - - - - - - - - - 08:00 08:00 08:00 Vol. 22 24 46 - - - 16 15 30 - - - - - - - - - - - - 22 24 46 PM Peak 15:00 13:00 15:00 - - - 17:00 12:00 17:00 - - - - - - - - - - - - 15:00 13:00 15:00 Vol. 26 18 43 - - - 31 23 46 - - - - - - - - - - - - 26 18 43
1. Mid-week average includes data between Tuesday and Thursday.
Time
Thursday Friday Saturday Sunday Monday Tuesday Wednesday Mid-Week Average1/15/20251/9/2025 1/10/2025 1/11/2025 1/12/2025 1/13/2025 1/14/2025 1 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Direction: Northbound / Southbound
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + 43 297 157 1 0 0 0 0 0 0 0 0 0 0 0 0 0
8.6% 59.6% 31.5% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40 303 162 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.9% 60.0% 32.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83 600 319 1 0 0 0 0 0 0 0 0 0 0 0 0 0
8.3% 59.8% 31.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 13.9 mph Mean (Average) Speed 13.7 mph
16.3 mph 10 mph Pace 8.9 - 18.9 mph
17.4 mph Percent in Pace 96.0 %
50th Percentile (Median) 14.0 mph Mean (Average) Speed 13.8 mph
16.3 mph 10 mph Pace 8.6 - 18.6 mph
17.7 mph Percent in Pace 96.0 %
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Total Study Percentile Speed Summary Total Study Speed Statistics 85th Percentile
1,003
505
498
SouthboundSouthbound
NorthboundNorthbound
Total
Southbound
Northbound
Total
VolumeDirection
Speed Range (mph)
95th Percentile
1 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
6:00 AM 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 1 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
8:00 AM 6 22 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34
9:00 AM 1 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
10:00 AM 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 AM 3 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
12:00 PM 0 6 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
1:00 PM 0 7 7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 15
2:00 PM 1 14 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18
3:00 PM 1 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30
4:00 PM 3 14 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23
5:00 PM 2 23 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29
6:00 PM 0 9 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
7:00 PM 0 6 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
8:00 PM 4 9 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
9:00 PM 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
10:00 PM 0 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
23 150 83 1 0 0 0 0 0 0 0 0 0 0 0 0 0
8.9% 58.4% 32.3% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 14.0 mph Mean (Average) Speed 13.7 mph 85th Percentile 16.4 mph 10 mph Pace mph
95th Percentile 17.6 mph Percent in Pace 96.1 %
Thursday, January 9, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
8.9 - 18.9
Time
257Total
2 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 1 4 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
6:00 AM 0 5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
7:00 AM 4 21 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35
8:00 AM 3 34 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 46
9:00 AM 1 10 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
10:00 AM 1 7 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
11:00 AM 1 6 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
12:00 PM 2 5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
1:00 PM 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
2:00 PM 0 10 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
3:00 PM 1 6 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
4:00 PM 5 10 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
5:00 PM 2 12 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19
6:00 PM 2 3 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
7:00 PM 0 7 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
8:00 PM 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
9:00 PM 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
10:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
11:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
23 156 97 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.3% 56.5% 35.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 14.0 mph Mean (Average) Speed 13.8 mph 85th Percentile 16.7 mph 10 mph Pace mph
95th Percentile 17.7 mph Percent in Pace 94.93 %
Thursday, January 9, 2025
Speed Range (mph)Time
276Total
Daily Percentile Speed Summary Speed Statistics
8.6 - 18.6
3 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
1:00 AM 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 AM 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
9:00 AM 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 1 7 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
11:00 AM 1 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
12:00 PM 2 13 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25
1:00 PM 3 13 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
2:00 PM 5 13 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25
3:00 PM 1 11 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
4:00 PM 1 16 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19
5:00 PM 3 11 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18
6:00 PM 0 16 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
7:00 PM 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
8:00 PM 2 11 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
9:00 PM 0 7 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
10:00 PM 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
20 147 74 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.3% 61.0% 30.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 13.8 mph Mean (Average) Speed 13.7 mph 85th Percentile 16.3 mph 10 mph Pace mph
95th Percentile 17.2 mph Percent in Pace 96.3 %
Saturday, January 11, 2025
Speed Range (mph)Time
Total 241
Daily Percentile Speed Summary Speed Statistics
8.3 - 18.3
4 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
6:00 AM 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
7:00 AM 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
8:00 AM 1 6 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
9:00 AM 1 8 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
10:00 AM 0 11 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18
11:00 AM 2 13 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
12:00 PM 0 12 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19
1:00 PM 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
2:00 PM 1 10 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
3:00 PM 0 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
4:00 PM 3 11 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
5:00 PM 5 15 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
6:00 PM 1 11 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
7:00 PM 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
8:00 PM 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11
9:00 PM 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
10:00 PM 1 4 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
11:00 PM 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
17 147 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.4% 64.2% 28.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 14.0 mph Mean (Average) Speed 13.8 mph 85th Percentile 16.0 mph 10 mph Pace mph
95th Percentile 17.5 mph Percent in Pace 97.38 %
Time
Total 229
8.6 - 18.6
Saturday, January 11, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
5 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
8:00 AM 3 14 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
9:00 AM 1 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
10:00 AM 1 5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
11:00 AM 2 6 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
12:00 PM 1 10 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20
1:00 PM 2 10 7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 20
2:00 PM 3 14 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
3:00 PM 1 12 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26
4:00 PM 2 15 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
5:00 PM 3 17 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24
6:00 PM 0 13 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18
7:00 PM 0 6 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
8:00 PM 3 10 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
9:00 PM 0 8 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
10:00 PM 0 2 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
23 153 84 1 0 0 0 0 0 0 0 0 0 0 0 0 0
8.8% 58.6% 32.2% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 13.9 mph Mean (Average) Speed 13.7 mph 85th Percentile 16.3 mph 10 mph Pace 8.9 - 18.9 mph 95th Percentile 17.4 mph Percent in Pace 96.0 %
Total Study Average
Time
Total 261
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics 6 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 03
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 1 3 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
6:00 AM 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
7:00 AM 3 12 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
8:00 AM 2 20 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28
9:00 AM 1 9 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14
10:00 AM 1 9 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17
11:00 AM 2 10 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18
12:00 PM 1 9 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
1:00 PM 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
2:00 PM 1 10 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
3:00 PM 1 6 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
4:00 PM 4 11 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19
5:00 PM 4 14 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
6:00 PM 2 7 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14
7:00 PM 0 6 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
8:00 PM 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
9:00 PM 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
10:00 PM 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
24 158 88 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.9% 58.5% 32.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 14.0 mph Mean (Average) Speed 13.8 mph 85th Percentile 16.3 mph 10 mph Pace 8.6 - 18.6 mph 95th Percentile 17.7 mph Percent in Pace 96.0 %
Total Study Percentile Speed Summary Total Study Speed Statistics Time
Total 270
Total Study Average
Speed Range (mph)
7 Project Manager: (415) 310-6469
[email protected]
Location: Yosemite Pl, N/O John Muir Pkwy
Date Range: 1/9/2025 - 1/15/2025
Site Code: 03
NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total 12:00 AM 1 0 1 - - - 4 1 5 - - - - - - - - - - - - 1 0 1 1:00 AM 3 1 4 - - - 3 2 5 - - - - - - - - - - - - 3 1 4 2:00 AM 0 1 1 - - - 0 0 0 - - - - - - - - - - - - 0 1 1 3:00 AM 0 1 1 - - - 0 3 3 - - - - - - - - - - - - 0 1 1 4:00 AM 0 4 4 - - - 1 1 2 - - - - - - - - - - - - 0 4 4 5:00 AM 4 11 15 - - - 0 3 3 - - - - - - - - - - - - 4 11 15 6:00 AM 4 9 13 - - - 0 5 5 - - - - - - - - - - - - 4 9 13 7:00 AM 5 35 40 - - - 1 4 5 - - - - - - - - - - - - 5 35 40 8:00 AM 34 46 80 - - - 8 10 18 - - - - - - - - - - - - 34 46 80 9:00 AM 7 15 22 - - - 2 13 15 - - - - - - - - - - - - 7 15 22 10:00 AM 6 15 21 - - - 10 18 28 - - - - - - - - - - - - 6 15 21 11:00 AM 9 12 21 - - - 13 21 34 - - - - - - - - - - - - 9 12 21 12:00 PM 13 11 24 - - - 25 19 44 - - - - - - - - - - - - 13 11 24 1:00 PM 15 6 21 - - - 22 10 32 - - - - - - - - - - - - 15 6 21 2:00 PM 18 16 34 - - - 25 15 40 - - - - - - - - - - - - 18 16 34 3:00 PM 30 16 46 - - - 21 12 33 - - - - - - - - - - - - 30 16 46 4:00 PM 23 21 44 - - - 19 16 35 - - - - - - - - - - - - 23 21 44 5:00 PM 29 19 48 - - - 18 22 40 - - - - - - - - - - - - 29 19 48 6:00 PM 13 12 25 - - - 21 15 36 - - - - - - - - - - - - 13 12 25 7:00 PM 11 12 23 - - - 8 7 15 - - - - - - - - - - - - 11 12 23 8:00 PM 15 7 22 - - - 16 11 27 - - - - - - - - - - - - 15 7 22 9:00 PM 9 3 12 - - - 15 8 23 - - - - - - - - - - - - 9 3 12 10:00 PM 6 2 8 - - - 6 8 14 - - - - - - - - - - - - 6 2 8 11:00 PM 2 1 3 - - - 3 5 8 - - - - - - - - - - - - 2 1 3 Total 257 276 533 - - - 241 229 470 - - - - - - - - - - - - 257 276 533 Percent 48% 52% - - 51% 49% - - - - - - - - 48% 52%
AM Peak 08:00 08:00 08:00 - - - 11:00 11:00 11:00 - - - - - - - - - - - - 08:00 08:00 08:00 Vol. 34 46 80 - - - 13 21 34 - - - - - - - - - - - - 34 46 80 PM Peak 15:00 16:00 17:00 - - - 12:00 17:00 12:00 - - - - - - - - - - - - 15:00 16:00 17:00 Vol. 30 21 48 - - - 25 22 44 - - - - - - - - - - - - 30 21 48
1. Mid-week average includes data between Tuesday and Thursday.
Time
Thursday Friday Saturday Sunday Monday Tuesday Wednesday Mid-Week Average1/15/20251/9/2025 1/10/2025 1/11/2025 1/12/2025 1/13/2025 1/14/2025 1 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Direction: Eastbound / Westbound
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + 0 8 50 534 1,858 1,620 576 98 16 1 0 0 0 0 0 0 0
0.0% 0.2% 1.1% 11.2% 39.0% 34.0% 12.1% 2.1% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16 148 728 479 735 1,132 491 91 14 2 0 1 0 0 0 0 0
0.4% 3.9% 19.0% 12.5% 19.2% 29.5% 12.8% 2.4% 0.4% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16 156 778 1,013 2,593 2,752 1,067 189 30 3 0 1 0 0 0 0 0
0.2% 1.8% 9.0% 11.8% 30.2% 32.0% 12.4% 2.2% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.9 mph Mean (Average) Speed 30.1 mph
34.9 mph 10 mph Pace 24.3 - 34.3 mph
37.9 mph Percent in Pace 73.2 %
50th Percentile (Median) 29.1 mph Mean (Average) Speed 27.5 mph
35.1 mph 10 mph Pace 26.8 - 36.8 mph
38.6 mph Percent in Pace 50.1 %
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Total Study Percentile Speed Summary Total Study Speed Statistics 85th Percentile
8,598
3,837
4,761
WestboundWestbound
EastboundEastbound
Total
Westbound
Eastbound
Total
VolumeDirection
Speed Range (mph)
95th Percentile
1 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 2 2 1 2 0 0 0 0 0 0 0 0 0 0 7
1:00 AM 0 0 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 3
2:00 AM 0 0 1 1 4 2 0 0 0 0 0 0 0 0 0 0 0 8
3:00 AM 0 1 0 1 5 0 3 1 0 0 0 0 0 0 0 0 0 11
4:00 AM 0 0 0 4 8 10 7 0 1 0 0 0 0 0 0 0 0 30
5:00 AM 0 0 1 10 31 29 7 1 1 0 0 0 0 0 0 0 0 80
6:00 AM 0 0 0 5 50 47 15 3 0 0 0 0 0 0 0 0 0 120
7:00 AM 0 0 5 33 107 66 19 4 1 0 0 0 0 0 0 0 0 235
8:00 AM 0 1 1 39 86 48 19 1 0 0 0 0 0 0 0 0 0 195
9:00 AM 0 0 1 26 60 56 17 2 1 0 0 0 0 0 0 0 0 163
10:00 AM 0 1 2 19 56 51 8 1 0 0 0 0 0 0 0 0 0 138
11:00 AM 0 0 0 12 38 54 21 3 0 0 0 0 0 0 0 0 0 128
12:00 PM 0 1 2 16 58 43 27 5 1 0 0 0 0 0 0 0 0 153
1:00 PM 0 0 2 13 36 55 28 2 0 0 0 0 0 0 0 0 0 136
2:00 PM 0 0 2 10 50 53 24 4 0 0 0 0 0 0 0 0 0 143
3:00 PM 0 0 2 17 54 53 17 5 0 0 0 0 0 0 0 0 0 148
4:00 PM 0 0 3 18 60 50 25 3 0 0 0 0 0 0 0 0 0 159
5:00 PM 0 0 4 29 66 42 6 1 0 0 0 0 0 0 0 0 0 148
6:00 PM 0 0 2 23 64 36 10 0 0 0 0 0 0 0 0 0 0 135
7:00 PM 0 0 1 12 44 26 11 1 1 0 0 0 0 0 0 0 0 96
8:00 PM 0 0 1 18 36 22 6 0 1 0 0 0 0 0 0 0 0 84
9:00 PM 0 0 0 7 21 17 2 1 0 0 0 0 0 0 0 0 0 48
10:00 PM 0 0 0 7 19 10 5 2 1 0 0 0 0 0 0 0 0 44
11:00 PM 0 0 1 1 6 8 0 0 1 0 0 0 0 0 0 0 0 17
0 4 31 324 962 779 279 40 10 0 0 0 0 0 0 0 0
0.0% 0.2% 1.3% 13.3% 39.6% 32.1% 11.5% 1.6% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.5 mph Mean (Average) Speed 29.8 mph 85th Percentile 34.6 mph 10 mph Pace mph
95th Percentile 37.8 mph Percent in Pace 73.1 %
Thursday, January 9, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
24.3 - 34.3
Time
2,429Total
2 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 3 1 6 6 1 0 0 0 0 0 0 0 0 0 0 17
1:00 AM 0 0 2 1 4 0 0 0 0 0 0 0 0 0 0 0 0 7
2:00 AM 0 0 1 1 1 2 0 1 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 1 1 4 1 3 0 0 0 0 0 0 0 0 0 0 0 10
6:00 AM 1 2 5 3 5 8 0 1 0 0 0 0 0 0 0 0 0 25
7:00 AM 1 4 13 10 16 11 5 0 0 0 0 0 0 0 0 0 0 60
8:00 AM 2 5 26 24 34 26 13 1 0 0 0 0 0 0 0 0 0 131
9:00 AM 0 3 9 9 14 23 11 5 1 0 0 0 0 0 0 0 0 75
10:00 AM 0 0 13 11 17 15 13 3 1 0 0 0 0 0 0 0 0 73
11:00 AM 0 2 21 12 17 28 14 1 0 0 0 0 0 0 0 0 0 95
12:00 PM 0 4 23 20 22 21 25 2 0 0 0 0 0 0 0 0 0 117
1:00 PM 0 5 15 20 12 36 22 2 0 0 0 1 0 0 0 0 0 113
2:00 PM 0 4 30 12 20 40 19 7 0 0 0 0 0 0 0 0 0 132
3:00 PM 0 5 31 30 31 52 25 5 4 1 0 0 0 0 0 0 0 184
4:00 PM 0 6 44 29 34 45 33 3 1 0 0 0 0 0 0 0 0 195
5:00 PM 0 14 49 33 44 53 20 2 0 0 0 0 0 0 0 0 0 215
6:00 PM 4 3 26 17 43 45 11 1 0 0 0 0 0 0 0 0 0 150
7:00 PM 0 6 17 15 40 40 19 3 0 0 0 0 0 0 0 0 0 140
8:00 PM 1 2 19 9 20 23 3 1 0 0 0 0 0 0 0 0 0 78
9:00 PM 0 4 17 8 14 17 7 1 0 0 0 0 0 0 0 0 0 68
10:00 PM 0 1 6 5 7 17 5 2 0 0 0 0 0 0 0 0 0 43
11:00 PM 0 0 2 2 8 10 1 0 0 0 0 0 0 0 0 0 0 23
9 71 374 276 411 521 247 41 7 1 0 1 0 0 0 0 0
0.5% 3.6% 19.1% 14.1% 21.0% 26.6% 12.6% 2.1% 0.4% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 28.4 mph Mean (Average) Speed 27.3 mph 85th Percentile 35.1 mph 10 mph Pace mph
95th Percentile 38.4 mph Percent in Pace 48.49 %
Thursday, January 9, 2025
Speed Range (mph)Time
1,959Total
Daily Percentile Speed Summary Speed Statistics
26.1 - 36.1
3 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 0 8 4 3 0 0 0 0 0 0 0 0 0 0 15
1:00 AM 0 0 0 0 3 6 3 0 0 0 0 0 0 0 0 0 0 12
2:00 AM 0 0 0 1 2 6 0 0 0 0 0 0 0 0 0 0 0 9
3:00 AM 0 0 0 2 5 4 1 0 0 0 0 0 0 0 0 0 0 12
4:00 AM 0 0 0 4 3 6 1 0 1 0 0 0 0 0 0 0 0 15
5:00 AM 0 0 1 4 6 6 4 1 2 0 0 0 0 0 0 0 0 24
6:00 AM 0 0 0 2 21 19 8 1 0 0 0 0 0 0 0 0 0 51
7:00 AM 0 1 0 9 22 23 9 4 0 0 0 0 0 0 0 0 0 68
8:00 AM 0 0 0 4 45 49 16 1 0 0 0 0 0 0 0 0 0 115
9:00 AM 0 0 1 9 45 73 28 6 0 0 0 0 0 0 0 0 0 162
10:00 AM 0 0 0 3 76 56 24 9 0 0 0 0 0 0 0 0 0 168
11:00 AM 0 0 3 20 71 61 24 4 1 0 0 0 0 0 0 0 0 184
12:00 PM 0 1 0 15 74 66 24 5 1 0 0 0 0 0 0 0 0 186
1:00 PM 0 0 1 8 45 77 40 6 0 0 0 0 0 0 0 0 0 177
2:00 PM 0 0 2 15 59 66 24 3 1 0 0 0 0 0 0 0 0 170
3:00 PM 0 0 2 11 62 58 20 5 0 1 0 0 0 0 0 0 0 159
4:00 PM 0 0 2 20 58 67 13 3 0 0 0 0 0 0 0 0 0 163
5:00 PM 0 1 3 17 96 57 14 0 0 0 0 0 0 0 0 0 0 188
6:00 PM 0 0 1 19 71 43 6 1 0 0 0 0 0 0 0 0 0 141
7:00 PM 0 0 0 16 35 23 4 1 0 0 0 0 0 0 0 0 0 79
8:00 PM 0 1 1 16 29 21 14 2 0 0 0 0 0 0 0 0 0 84
9:00 PM 0 0 1 10 20 24 6 2 0 0 0 0 0 0 0 0 0 63
10:00 PM 0 0 1 3 25 16 5 2 0 0 0 0 0 0 0 0 0 52
11:00 PM 0 0 0 2 15 10 6 2 0 0 0 0 0 0 0 0 0 35
0 4 19 210 896 841 297 58 6 1 0 0 0 0 0 0 0
0.0% 0.2% 0.8% 9.0% 38.4% 36.1% 12.7% 2.5% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 30.2 mph Mean (Average) Speed 30.4 mph 85th Percentile 35.1 mph 10 mph Pace mph
95th Percentile 38.1 mph Percent in Pace 74.5 %
Saturday, January 11, 2025
Speed Range (mph)Time
Total 2,332
Daily Percentile Speed Summary Speed Statistics
25.2 - 35.2
4 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 2 5 1 3 16 9 0 0 0 0 0 0 0 0 0 0 36
1:00 AM 0 1 2 4 2 4 1 0 0 0 0 0 0 0 0 0 0 14
2:00 AM 0 0 0 1 2 3 2 0 0 0 0 0 0 0 0 0 0 8
3:00 AM 0 0 0 0 0 1 2 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 0 1 1 0 2 0 0 1 0 0 0 0 0 0 0 0 5
6:00 AM 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 0 1 2 1 8 6 6 0 0 0 0 0 0 0 0 0 0 24
8:00 AM 0 2 7 7 3 13 14 2 0 0 0 0 0 0 0 0 0 48
9:00 AM 0 0 11 8 8 30 16 4 0 0 0 0 0 0 0 0 0 77
10:00 AM 0 1 15 13 16 26 10 3 2 0 0 0 0 0 0 0 0 86
11:00 AM 1 5 23 14 18 49 21 8 0 0 0 0 0 0 0 0 0 139
12:00 PM 0 6 29 16 15 46 23 7 0 0 0 0 0 0 0 0 0 142
1:00 PM 0 3 34 19 27 41 26 2 2 0 0 0 0 0 0 0 0 154
2:00 PM 0 8 30 20 18 40 18 7 1 0 0 0 0 0 0 0 0 142
3:00 PM 0 2 14 25 13 54 31 9 0 1 0 0 0 0 0 0 0 149
4:00 PM 3 7 28 12 38 42 15 3 0 0 0 0 0 0 0 0 0 148
5:00 PM 1 11 27 20 27 59 11 3 1 0 0 0 0 0 0 0 0 160
6:00 PM 1 8 34 16 34 46 10 0 0 0 0 0 0 0 0 0 0 149
7:00 PM 0 6 18 3 28 35 4 1 0 0 0 0 0 0 0 0 0 95
8:00 PM 1 8 22 9 28 33 10 0 0 0 0 0 0 0 0 0 0 111
9:00 PM 0 1 25 8 16 27 7 1 0 0 0 0 0 0 0 0 0 85
10:00 PM 0 5 14 2 11 22 5 0 0 0 0 0 0 0 0 0 0 59
11:00 PM 0 0 12 1 8 13 2 0 0 0 0 0 0 0 0 0 0 36
7 77 354 203 324 611 244 50 7 1 0 0 0 0 0 0 0
0.4% 4.1% 18.8% 10.8% 17.3% 32.5% 13.0% 2.7% 0.4% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 29.8 mph Mean (Average) Speed 27.8 mph 85th Percentile 35.2 mph 10 mph Pace mph
95th Percentile 38.7 mph Percent in Pace 51.92 %
Time
Total 1,878
26.8 - 36.8
Saturday, January 11, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
5 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 1 5 3 3 0 0 0 0 0 0 0 0 0 0 12
1:00 AM 0 0 0 1 2 3 2 0 1 0 0 0 0 0 0 0 0 9
2:00 AM 0 0 1 1 3 4 0 0 0 0 0 0 0 0 0 0 0 9
3:00 AM 0 1 0 2 5 2 2 1 0 0 0 0 0 0 0 0 0 13
4:00 AM 0 0 0 4 6 8 4 0 1 0 0 0 0 0 0 0 0 23
5:00 AM 0 0 1 7 19 18 6 1 2 0 0 0 0 0 0 0 0 54
6:00 AM 0 0 0 4 36 33 12 2 0 0 0 0 0 0 0 0 0 87
7:00 AM 0 1 3 21 65 45 14 4 1 0 0 0 0 0 0 0 0 154
8:00 AM 0 1 1 22 66 49 18 1 0 0 0 0 0 0 0 0 0 158
9:00 AM 0 0 1 18 53 65 23 4 1 0 0 0 0 0 0 0 0 165
10:00 AM 0 1 1 11 66 54 16 5 0 0 0 0 0 0 0 0 0 154
11:00 AM 0 0 2 16 55 58 23 4 1 0 0 0 0 0 0 0 0 159
12:00 PM 0 1 1 16 66 55 26 5 1 0 0 0 0 0 0 0 0 171
1:00 PM 0 0 2 11 41 66 34 4 0 0 0 0 0 0 0 0 0 158
2:00 PM 0 0 2 13 55 60 24 4 1 0 0 0 0 0 0 0 0 159
3:00 PM 0 0 2 14 58 56 19 5 0 1 0 0 0 0 0 0 0 155
4:00 PM 0 0 3 19 59 59 19 3 0 0 0 0 0 0 0 0 0 162
5:00 PM 0 1 4 23 81 50 10 1 0 0 0 0 0 0 0 0 0 170
6:00 PM 0 0 2 21 68 40 8 1 0 0 0 0 0 0 0 0 0 140
7:00 PM 0 0 1 14 40 25 8 1 1 0 0 0 0 0 0 0 0 90
8:00 PM 0 1 1 17 33 22 10 1 1 0 0 0 0 0 0 0 0 86
9:00 PM 0 0 1 9 21 21 4 2 0 0 0 0 0 0 0 0 0 58
10:00 PM 0 0 1 5 22 13 5 2 1 0 0 0 0 0 0 0 0 49
11:00 PM 0 0 1 2 11 9 3 1 1 0 0 0 0 0 0 0 0 28
0 7 31 272 936 818 293 52 13 1 0 0 0 0 0 0 0
0.0% 0.3% 1.3% 11.2% 38.6% 33.8% 12.1% 2.1% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 29.9 mph Mean (Average) Speed 30.1 mph 85th Percentile 34.9 mph 10 mph Pace 24.3 - 34.3 mph 95th Percentile 37.9 mph Percent in Pace 73.2 %
Total Study Average
Time
Total 2,423
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics 6 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 to 1/11/2025
Site Code: 04
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 1 4 1 5 11 5 0 0 0 0 0 0 0 0 0 0 27
1:00 AM 0 1 2 3 3 2 1 0 0 0 0 0 0 0 0 0 0 12
2:00 AM 0 0 1 1 2 3 1 1 0 0 0 0 0 0 0 0 0 9
3:00 AM 0 0 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 1 1 3 1 3 0 0 1 0 0 0 0 0 0 0 0 10
6:00 AM 1 1 3 2 3 5 1 1 0 0 0 0 0 0 0 0 0 17
7:00 AM 1 3 8 6 12 9 6 0 0 0 0 0 0 0 0 0 0 45
8:00 AM 1 4 17 16 19 20 14 2 0 0 0 0 0 0 0 0 0 93
9:00 AM 0 2 10 9 11 27 14 5 1 0 0 0 0 0 0 0 0 79
10:00 AM 0 1 14 12 17 21 12 3 2 0 0 0 0 0 0 0 0 82
11:00 AM 1 4 22 13 18 39 18 5 0 0 0 0 0 0 0 0 0 120
12:00 PM 0 5 26 18 19 34 24 5 0 0 0 0 0 0 0 0 0 131
1:00 PM 0 4 25 20 20 39 24 2 1 0 0 1 0 0 0 0 0 136
2:00 PM 0 6 30 16 19 40 19 7 1 0 0 0 0 0 0 0 0 138
3:00 PM 0 4 23 28 22 53 28 7 2 1 0 0 0 0 0 0 0 168
4:00 PM 2 7 36 21 36 44 24 3 1 0 0 0 0 0 0 0 0 174
5:00 PM 1 13 38 27 36 56 16 3 1 0 0 0 0 0 0 0 0 191
6:00 PM 3 6 30 17 39 46 11 1 0 0 0 0 0 0 0 0 0 153
7:00 PM 0 6 18 9 34 38 12 2 0 0 0 0 0 0 0 0 0 119
8:00 PM 1 5 21 9 24 28 7 1 0 0 0 0 0 0 0 0 0 96
9:00 PM 0 3 21 8 15 22 7 1 0 0 0 0 0 0 0 0 0 77
10:00 PM 0 3 10 4 9 20 5 1 0 0 0 0 0 0 0 0 0 52
11:00 PM 0 0 7 2 8 12 2 0 0 0 0 0 0 0 0 0 0 31
11 80 369 246 373 574 252 50 10 1 0 1 0 0 0 0 0
0.6% 4.1% 18.8% 12.5% 19.0% 29.2% 12.8% 2.5% 0.5% 0.1% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 29.1 mph Mean (Average) Speed 27.5 mph 85th Percentile 35.1 mph 10 mph Pace 26.8 - 36.8 mph 95th Percentile 38.6 mph Percent in Pace 50.1 %
Total Study Percentile Speed Summary Total Study Speed Statistics Time
Total 1,967
Total Study Average
Speed Range (mph)
7 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, E/O Tsushima St
Date Range: 1/9/2025 - 1/15/2025
Site Code: 04
EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total 12:00 AM 7 17 24 - - - 15 36 51 - - - - - - - - - - - - 7 17 24 1:00 AM 3 7 10 - - - 12 14 26 - - - - - - - - - - - - 3 7 10 2:00 AM 8 6 14 - - - 9 8 17 - - - - - - - - - - - - 8 6 14 3:00 AM 11 1 12 - - - 12 3 15 - - - - - - - - - - - - 11 1 12 4:00 AM 30 1 31 - - - 15 4 19 - - - - - - - - - - - - 30 1 31 5:00 AM 80 10 90 - - - 24 5 29 - - - - - - - - - - - - 80 10 90 6:00 AM 120 25 145 - - - 51 4 55 - - - - - - - - - - - - 120 25 145 7:00 AM 235 60 295 - - - 68 24 92 - - - - - - - - - - - - 235 60 295 8:00 AM 195 131 326 - - - 115 48 163 - - - - - - - - - - - - 195 131 326 9:00 AM 163 75 238 - - - 162 77 239 - - - - - - - - - - - - 163 75 238 10:00 AM 138 73 211 - - - 168 86 254 - - - - - - - - - - - - 138 73 211 11:00 AM 128 95 223 - - - 184 139 323 - - - - - - - - - - - - 128 95 223 12:00 PM 153 117 270 - - - 186 142 328 - - - - - - - - - - - - 153 117 270 1:00 PM 136 113 249 - - - 177 154 331 - - - - - - - - - - - - 136 113 249 2:00 PM 143 132 275 - - - 170 142 312 - - - - - - - - - - - - 143 132 275 3:00 PM 148 184 332 - - - 159 149 308 - - - - - - - - - - - - 148 184 332 4:00 PM 159 195 354 - - - 163 148 311 - - - - - - - - - - - - 159 195 354 5:00 PM 148 215 363 - - - 188 160 348 - - - - - - - - - - - - 148 215 363 6:00 PM 135 150 285 - - - 141 149 290 - - - - - - - - - - - - 135 150 285 7:00 PM 96 140 236 - - - 79 95 174 - - - - - - - - - - - - 96 140 236 8:00 PM 84 78 162 - - - 84 111 195 - - - - - - - - - - - - 84 78 162 9:00 PM 48 68 116 - - - 63 85 148 - - - - - - - - - - - - 48 68 116 10:00 PM 44 43 87 - - - 52 59 111 - - - - - - - - - - - - 44 43 87 11:00 PM 17 23 40 - - - 35 36 71 - - - - - - - - - - - - 17 23 40 Total 2,429 1,959 4,388 - - - 2,332 1,878 4,210 - - - - - - - - - - - - 2,429 1,959 4,388 Percent 55% 45% - - 55% 45% - - - - - - - - 55% 45%
AM Peak 07:00 08:00 08:00 - - - 11:00 11:00 11:00 - - - - - - - - - - - - 07:00 08:00 08:00 Vol. 235 131 326 - - - 184 139 323 - - - - - - - - - - - - 235 131 326 PM Peak 16:00 17:00 17:00 - - - 17:00 17:00 17:00 - - - - - - - - - - - - 16:00 17:00 17:00 Vol. 159 215 363 - - - 188 160 348 - - - - - - - - - - - - 159 215 363
1. Mid-week average includes data between Tuesday and Thursday.
Time
Thursday Friday Saturday Sunday Monday Tuesday Wednesday Mid-Week Average1/15/20251/9/2025 1/10/2025 1/11/2025 1/12/2025 1/13/2025 1/14/2025 1 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Direction: Northbound / Southbound
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + 12 153 911 419 23 0 0 0 0 0 0 0 0 0 0 0 0
0.8% 10.1% 60.0% 27.6% 1.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8 80 521 410 32 2 0 0 0 0 0 0 0 0 0 0 0
0.8% 7.6% 49.5% 38.9% 3.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20 233 1,432 829 55 2 0 0 0 0 0 0 0 0 0 0 0
0.8% 9.1% 55.7% 32.2% 2.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 18.5 mph Mean (Average) Speed 18.5 mph
21.4 mph 10 mph Pace 13.3 - 23.3 mph
23.3 mph Percent in Pace 91.4 %
50th Percentile (Median) 19.5 mph Mean (Average) Speed 19.3 mph
22.4 mph 10 mph Pace 14.3 - 24.3 mph
24.2 mph Percent in Pace 89.7 %
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Total Study Percentile Speed Summary Total Study Speed Statistics 85th Percentile
2,571
1,053
1,518
SouthboundSouthbound
NorthboundNorthbound
Total
Southbound
Northbound
Total
VolumeDirection
Speed Range (mph)
95th Percentile
1 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
3:00 AM 0 2 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 5
4:00 AM 0 1 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 7
5:00 AM 0 2 17 9 1 0 0 0 0 0 0 0 0 0 0 0 0 29
6:00 AM 0 1 22 18 1 0 0 0 0 0 0 0 0 0 0 0 0 42
7:00 AM 1 4 50 19 1 0 0 0 0 0 0 0 0 0 0 0 0 75
8:00 AM 0 5 32 21 1 0 0 0 0 0 0 0 0 0 0 0 0 59
9:00 AM 0 5 40 18 1 0 0 0 0 0 0 0 0 0 0 0 0 64
10:00 AM 0 7 32 14 1 0 0 0 0 0 0 0 0 0 0 0 0 54
11:00 AM 0 3 23 9 1 0 0 0 0 0 0 0 0 0 0 0 0 36
12:00 PM 0 5 32 13 0 0 0 0 0 0 0 0 0 0 0 0 0 50
1:00 PM 2 8 24 5 1 0 0 0 0 0 0 0 0 0 0 0 0 40
2:00 PM 0 2 30 17 1 0 0 0 0 0 0 0 0 0 0 0 0 50
3:00 PM 1 8 21 17 0 0 0 0 0 0 0 0 0 0 0 0 0 47
4:00 PM 0 7 32 11 1 0 0 0 0 0 0 0 0 0 0 0 0 51
5:00 PM 0 2 34 15 0 0 0 0 0 0 0 0 0 0 0 0 0 51
6:00 PM 1 6 27 12 0 0 0 0 0 0 0 0 0 0 0 0 0 46
7:00 PM 0 5 14 12 0 0 0 0 0 0 0 0 0 0 0 0 0 31
8:00 PM 0 5 9 3 1 0 0 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 0 3 15 1 0 0 0 0 0 0 0 0 0 0 0 0 0 19
10:00 PM 0 1 8 4 1 0 0 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 1 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5
5 84 470 225 13 0 0 0 0 0 0 0 0 0 0 0 0
0.6% 10.5% 59.0% 28.2% 1.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 18.6 mph Mean (Average) Speed 18.5 mph 85th Percentile 21.4 mph 10 mph Pace mph
95th Percentile 23.6 mph Percent in Pace 90.3 %
Thursday, January 9, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
13.3 - 23.3
Time
797Total
2 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 0 3 4 0 0 0 0 0 0 0 0 0 0 0 0 0 7
6:00 AM 0 0 1 6 0 0 0 0 0 0 0 0 0 0 0 0 0 7
7:00 AM 0 4 27 17 2 0 0 0 0 0 0 0 0 0 0 0 0 50
8:00 AM 0 3 21 19 1 0 0 0 0 0 0 0 0 0 0 0 0 44
9:00 AM 0 1 12 7 2 0 0 0 0 0 0 0 0 0 0 0 0 22
10:00 AM 1 0 7 10 1 0 0 0 0 0 0 0 0 0 0 0 0 19
11:00 AM 2 2 16 11 2 0 0 0 0 0 0 0 0 0 0 0 0 33
12:00 PM 0 1 17 12 0 1 0 0 0 0 0 0 0 0 0 0 0 31
1:00 PM 0 3 19 10 1 0 0 0 0 0 0 0 0 0 0 0 0 33
2:00 PM 1 2 16 18 3 0 0 0 0 0 0 0 0 0 0 0 0 40
3:00 PM 1 2 18 19 1 0 0 0 0 0 0 0 0 0 0 0 0 41
4:00 PM 0 7 39 22 2 0 0 0 0 0 0 0 0 0 0 0 0 70
5:00 PM 1 4 32 28 0 0 0 0 0 0 0 0 0 0 0 0 0 65
6:00 PM 0 6 26 10 1 0 0 0 0 0 0 0 0 0 0 0 0 43
7:00 PM 0 0 13 11 0 0 0 0 0 0 0 0 0 0 0 0 0 24
8:00 PM 1 3 5 11 0 0 0 0 0 0 0 0 0 0 0 0 0 20
9:00 PM 0 0 16 3 0 0 0 0 0 0 0 0 0 0 0 0 0 19
10:00 PM 0 1 5 3 0 0 0 0 0 0 0 0 0 0 0 0 0 9
11:00 PM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
7 39 297 224 17 1 0 0 0 0 0 0 0 0 0 0 0
1.2% 6.7% 50.8% 38.3% 2.9% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 19.3 mph Mean (Average) Speed 19.3 mph 85th Percentile 22.3 mph 10 mph Pace mph
95th Percentile 24.2 mph Percent in Pace 90.43 %
Thursday, January 9, 2025
Speed Range (mph)Time
585Total
Daily Percentile Speed Summary Speed Statistics
14.3 - 24.3
3 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5
4:00 AM 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 9
6:00 AM 0 0 18 3 1 0 0 0 0 0 0 0 0 0 0 0 0 22
7:00 AM 0 5 9 9 0 0 0 0 0 0 0 0 0 0 0 0 0 23
8:00 AM 0 2 22 15 0 0 0 0 0 0 0 0 0 0 0 0 0 39
9:00 AM 1 4 26 21 1 0 0 0 0 0 0 0 0 0 0 0 0 53
10:00 AM 3 4 22 16 1 0 0 0 0 0 0 0 0 0 0 0 0 46
11:00 AM 0 6 45 11 1 0 0 0 0 0 0 0 0 0 0 0 0 63
12:00 PM 1 2 34 25 0 0 0 0 0 0 0 0 0 0 0 0 0 62
1:00 PM 0 4 31 22 1 0 0 0 0 0 0 0 0 0 0 0 0 58
2:00 PM 1 5 28 10 0 0 0 0 0 0 0 0 0 0 0 0 0 44
3:00 PM 0 5 41 13 2 0 0 0 0 0 0 0 0 0 0 0 0 61
4:00 PM 0 9 40 6 0 0 0 0 0 0 0 0 0 0 0 0 0 55
5:00 PM 0 8 32 5 0 0 0 0 0 0 0 0 0 0 0 0 0 45
6:00 PM 1 4 23 13 0 0 0 0 0 0 0 0 0 0 0 0 0 41
7:00 PM 0 4 18 3 1 0 0 0 0 0 0 0 0 0 0 0 0 26
8:00 PM 0 6 6 3 1 0 0 0 0 0 0 0 0 0 0 0 0 16
9:00 PM 0 0 13 5 0 0 0 0 0 0 0 0 0 0 0 0 0 18
10:00 PM 0 0 11 3 0 0 0 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 0 9 3 0 0 0 0 0 0 0 0 0 0 0 0 0 12
7 69 441 194 10 0 0 0 0 0 0 0 0 0 0 0 0
1.0% 9.6% 61.2% 26.9% 1.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 18.3 mph Mean (Average) Speed 18.4 mph 85th Percentile 21.3 mph 10 mph Pace mph
95th Percentile 22.8 mph Percent in Pace 92.7 %
Saturday, January 11, 2025
Speed Range (mph)Time
Total 721
Daily Percentile Speed Summary Speed Statistics
13.3 - 23.3
4 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 2 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 4
2:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
7:00 AM 0 2 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 7
8:00 AM 0 0 3 7 0 0 0 0 0 0 0 0 0 0 0 0 0 10
9:00 AM 0 0 8 11 1 0 0 0 0 0 0 0 0 0 0 0 0 20
10:00 AM 0 3 13 12 1 0 0 0 0 0 0 0 0 0 0 0 0 29
11:00 AM 0 3 12 15 2 0 0 0 0 0 0 0 0 0 0 0 0 32
12:00 PM 0 1 19 14 1 1 0 0 0 0 0 0 0 0 0 0 0 36
1:00 PM 0 3 16 28 1 0 0 0 0 0 0 0 0 0 0 0 0 48
2:00 PM 0 4 22 22 0 0 0 0 0 0 0 0 0 0 0 0 0 48
3:00 PM 0 4 14 11 2 0 0 0 0 0 0 0 0 0 0 0 0 31
4:00 PM 1 4 18 7 1 0 0 0 0 0 0 0 0 0 0 0 0 31
5:00 PM 0 2 23 7 2 0 0 0 0 0 0 0 0 0 0 0 0 34
6:00 PM 0 4 21 9 1 0 0 0 0 0 0 0 0 0 0 0 0 35
7:00 PM 0 4 10 4 1 0 0 0 0 0 0 0 0 0 0 0 0 19
8:00 PM 0 3 12 8 1 0 0 0 0 0 0 0 0 0 0 0 0 24
9:00 PM 0 0 12 8 0 0 0 0 0 0 0 0 0 0 0 0 0 20
10:00 PM 0 1 8 5 0 0 0 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 1 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 13
1 41 224 186 15 1 0 0 0 0 0 0 0 0 0 0 0
0.2% 8.8% 47.9% 39.7% 3.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 19.5 mph Mean (Average) Speed 19.3 mph 85th Percentile 22.6 mph 10 mph Pace mph
95th Percentile 24.3 mph Percent in Pace 88.89 %
Time
Total 468
13.6 - 23.6
Saturday, January 11, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
5 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 1 2 1 1 0 0 0 0 0 0 0 0 0 0 0 0 5
3:00 AM 0 2 2 1 1 0 0 0 0 0 0 0 0 0 0 0 0 6
4:00 AM 0 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 6
5:00 AM 0 1 11 7 1 0 0 0 0 0 0 0 0 0 0 0 0 20
6:00 AM 0 1 20 11 1 0 0 0 0 0 0 0 0 0 0 0 0 33
7:00 AM 1 5 30 14 1 0 0 0 0 0 0 0 0 0 0 0 0 51
8:00 AM 0 4 27 18 1 0 0 0 0 0 0 0 0 0 0 0 0 50
9:00 AM 1 5 33 20 1 0 0 0 0 0 0 0 0 0 0 0 0 60
10:00 AM 2 6 27 15 1 0 0 0 0 0 0 0 0 0 0 0 0 51
11:00 AM 0 5 34 10 1 0 0 0 0 0 0 0 0 0 0 0 0 50
12:00 PM 1 4 33 19 0 0 0 0 0 0 0 0 0 0 0 0 0 57
1:00 PM 1 6 28 14 1 0 0 0 0 0 0 0 0 0 0 0 0 50
2:00 PM 1 4 29 14 1 0 0 0 0 0 0 0 0 0 0 0 0 49
3:00 PM 1 7 31 15 1 0 0 0 0 0 0 0 0 0 0 0 0 55
4:00 PM 0 8 36 9 1 0 0 0 0 0 0 0 0 0 0 0 0 54
5:00 PM 0 5 33 10 0 0 0 0 0 0 0 0 0 0 0 0 0 48
6:00 PM 1 5 25 13 0 0 0 0 0 0 0 0 0 0 0 0 0 44
7:00 PM 0 5 16 8 1 0 0 0 0 0 0 0 0 0 0 0 0 30
8:00 PM 0 6 8 3 1 0 0 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 0 2 14 3 0 0 0 0 0 0 0 0 0 0 0 0 0 19
10:00 PM 0 1 10 4 1 0 0 0 0 0 0 0 0 0 0 0 0 16
11:00 PM 0 1 6 3 0 0 0 0 0 0 0 0 0 0 0 0 0 10
9 85 459 216 16 0 0 0 0 0 0 0 0 0 0 0 0
1.1% 10.8% 58.5% 27.5% 2.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 18.5 mph Mean (Average) Speed 18.5 mph 85th Percentile 21.4 mph 10 mph Pace 13.3 - 23.3 mph 95th Percentile 23.3 mph Percent in Pace 91.4 %
Total Study Average
Time
Total 785
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics 6 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 to 1/11/2025
Site Code: 05
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
1:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 2 2 1 0 0 0 0 0 0 0 0 0 0 0 0 5
5:00 AM 0 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 5
6:00 AM 0 0 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 5
7:00 AM 0 3 14 11 1 0 0 0 0 0 0 0 0 0 0 0 0 29
8:00 AM 0 2 12 13 1 0 0 0 0 0 0 0 0 0 0 0 0 28
9:00 AM 0 1 10 9 2 0 0 0 0 0 0 0 0 0 0 0 0 22
10:00 AM 1 2 10 11 1 0 0 0 0 0 0 0 0 0 0 0 0 25
11:00 AM 1 3 14 13 2 0 0 0 0 0 0 0 0 0 0 0 0 33
12:00 PM 0 1 18 13 1 1 0 0 0 0 0 0 0 0 0 0 0 34
1:00 PM 0 3 18 19 1 0 0 0 0 0 0 0 0 0 0 0 0 41
2:00 PM 1 3 19 20 2 0 0 0 0 0 0 0 0 0 0 0 0 45
3:00 PM 1 3 16 15 2 0 0 0 0 0 0 0 0 0 0 0 0 37
4:00 PM 1 6 29 15 2 0 0 0 0 0 0 0 0 0 0 0 0 53
5:00 PM 1 3 28 18 1 0 0 0 0 0 0 0 0 0 0 0 0 51
6:00 PM 0 5 24 10 1 0 0 0 0 0 0 0 0 0 0 0 0 40
7:00 PM 0 2 12 8 1 0 0 0 0 0 0 0 0 0 0 0 0 23
8:00 PM 1 3 9 10 1 0 0 0 0 0 0 0 0 0 0 0 0 24
9:00 PM 0 0 14 6 0 0 0 0 0 0 0 0 0 0 0 0 0 20
10:00 PM 0 1 7 4 0 0 0 0 0 0 0 0 0 0 0 0 0 12
11:00 PM 0 1 3 4 0 0 0 0 0 0 0 0 0 0 0 0 0 8
7 43 265 212 20 1 0 0 0 0 0 0 0 0 0 0 0
1.3% 7.8% 48.4% 38.7% 3.6% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 19.5 mph Mean (Average) Speed 19.3 mph 85th Percentile 22.4 mph 10 mph Pace 14.3 - 24.3 mph 95th Percentile 24.2 mph Percent in Pace 89.7 %
Total Study Percentile Speed Summary Total Study Speed Statistics Time
Total 548
Total Study Average
Speed Range (mph)
7 Project Manager: (415) 310-6469
[email protected]
Location: Tsushima St, S/O John Muir Pkwy
Date Range: 1/9/2025 - 1/15/2025
Site Code: 05
NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total 12:00 AM 0 2 2 - - - 2 5 7 - - - - - - - - - - - - 0 2 2 1:00 AM 0 0 0 - - - 1 4 5 - - - - - - - - - - - - 0 0 0 2:00 AM 4 0 4 - - - 3 1 4 - - - - - - - - - - - - 4 0 4 3:00 AM 5 1 6 - - - 5 0 5 - - - - - - - - - - - - 5 1 6 4:00 AM 7 4 11 - - - 3 4 7 - - - - - - - - - - - - 7 4 11 5:00 AM 29 7 36 - - - 9 2 11 - - - - - - - - - - - - 29 7 36 6:00 AM 42 7 49 - - - 22 1 23 - - - - - - - - - - - - 42 7 49 7:00 AM 75 50 125 - - - 23 7 30 - - - - - - - - - - - - 75 50 125 8:00 AM 59 44 103 - - - 39 10 49 - - - - - - - - - - - - 59 44 103 9:00 AM 64 22 86 - - - 53 20 73 - - - - - - - - - - - - 64 22 86 10:00 AM 54 19 73 - - - 46 29 75 - - - - - - - - - - - - 54 19 73 11:00 AM 36 33 69 - - - 63 32 95 - - - - - - - - - - - - 36 33 69 12:00 PM 50 31 81 - - - 62 36 98 - - - - - - - - - - - - 50 31 81 1:00 PM 40 33 73 - - - 58 48 106 - - - - - - - - - - - - 40 33 73 2:00 PM 50 40 90 - - - 44 48 92 - - - - - - - - - - - - 50 40 90 3:00 PM 47 41 88 - - - 61 31 92 - - - - - - - - - - - - 47 41 88 4:00 PM 51 70 121 - - - 55 31 86 - - - - - - - - - - - - 51 70 121 5:00 PM 51 65 116 - - - 45 34 79 - - - - - - - - - - - - 51 65 116 6:00 PM 46 43 89 - - - 41 35 76 - - - - - - - - - - - - 46 43 89 7:00 PM 31 24 55 - - - 26 19 45 - - - - - - - - - - - - 31 24 55 8:00 PM 18 20 38 - - - 16 24 40 - - - - - - - - - - - - 18 20 38 9:00 PM 19 19 38 - - - 18 20 38 - - - - - - - - - - - - 19 19 38 10:00 PM 14 9 23 - - - 14 14 28 - - - - - - - - - - - - 14 9 23 11:00 PM 5 1 6 - - - 12 13 25 - - - - - - - - - - - - 5 1 6 Total 797 585 1,382 - - - 721 468 1,189 - - - - - - - - - - - - 797 585 1,382 Percent 58% 42% - - 61% 39% - - - - - - - - 58% 42%
AM Peak 07:00 07:00 07:00 - - - 11:00 11:00 11:00 - - - - - - - - - - - - 07:00 07:00 07:00 Vol. 75 50 125 - - - 63 32 95 - - - - - - - - - - - - 75 50 125 PM Peak 16:00 16:00 16:00 - - - 12:00 13:00 13:00 - - - - - - - - - - - - 16:00 16:00 16:00 Vol. 51 70 121 - - - 62 48 106 - - - - - - - - - - - - 51 70 121
1. Mid-week average includes data between Tuesday and Thursday.
Time
Thursday Friday Saturday Sunday Monday Tuesday Wednesday Mid-Week Average1/15/20251/9/2025 1/10/2025 1/11/2025 1/12/2025 1/13/2025 1/14/2025 1 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, Between Tioga Loop & Yosemite Pl Direction: Eastbound / Westbound
Date Range: 2/1/2025 to 2/1/2025
Site Code: 06
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + 0 3 12 121 363 524 244 69 9 3 0 0 0 0 0 0 0
0.0% 0.2% 0.9% 9.0% 26.9% 38.9% 18.1% 5.1% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 1 16 51 298 493 272 40 6 0 0 0 0 0 0 0 0
0.0% 0.1% 1.4% 4.3% 25.3% 41.9% 23.1% 3.4% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 4 28 172 661 1,017 516 109 15 3 0 0 0 0 0 0 0
0.0% 0.2% 1.1% 6.8% 26.2% 40.3% 20.4% 4.3% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 31.7 mph Mean (Average) Speed 31.7 mph
36.7 mph 10 mph Pace 26.1 - 36.1 mph
40.5 mph Percent in Pace 68.6 %
50th Percentile (Median) 32.1 mph Mean (Average) Speed 32.1 mph
36.9 mph 10 mph Pace 27.5 - 37.5 mph
39.5 mph Percent in Pace 73.0 %
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Total Study Percentile Speed Summary Total Study Speed Statistics 85th Percentile
2,525
1,177
1,348
WestboundWestbound
EastboundEastbound
Total
Westbound
Eastbound
Total
VolumeDirection
Speed Range (mph)
95th Percentile
1 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, Between Tioga Loop & Yosemite Pl Date Range: 2/1/2025 to 2/1/2025
Site Code: 06
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 1 1 7 4 0 0 0 0 0 0 0 0 0 0 13
1:00 AM 0 0 1 5 3 2 1 1 0 0 0 0 0 0 0 0 0 13
2:00 AM 0 0 0 0 2 2 1 2 0 0 0 0 0 0 0 0 0 7
3:00 AM 0 0 0 1 1 4 1 0 0 0 0 0 0 0 0 0 0 7
4:00 AM 0 0 0 1 1 3 2 0 0 0 0 0 0 0 0 0 0 7
5:00 AM 0 0 0 0 5 6 1 1 0 0 0 0 0 0 0 0 0 13
6:00 AM 0 0 0 1 9 13 3 2 0 0 0 0 0 0 0 0 0 28
7:00 AM 0 0 0 4 7 8 12 5 1 0 0 0 0 0 0 0 0 37
8:00 AM 0 0 0 4 16 33 23 4 0 0 0 0 0 0 0 0 0 80
9:00 AM 0 0 1 13 13 44 15 5 0 1 0 0 0 0 0 0 0 92
10:00 AM 0 1 0 8 27 38 16 3 2 0 0 0 0 0 0 0 0 95
11:00 AM 0 0 1 7 30 48 19 3 0 0 0 0 0 0 0 0 0 108
12:00 PM 0 0 3 5 34 44 17 6 1 0 0 0 0 0 0 0 0 110
1:00 PM 0 1 1 13 39 36 19 4 0 1 0 0 0 0 0 0 0 114
2:00 PM 0 0 0 10 19 36 22 7 1 0 0 0 0 0 0 0 0 95
3:00 PM 0 1 1 11 26 35 22 6 2 1 0 0 0 0 0 0 0 105
4:00 PM 0 0 0 4 17 24 16 9 1 0 0 0 0 0 0 0 0 71
5:00 PM 0 0 0 14 31 36 11 4 0 0 0 0 0 0 0 0 0 96
6:00 PM 0 0 1 3 18 29 7 1 1 0 0 0 0 0 0 0 0 60
7:00 PM 0 0 1 3 17 29 13 0 0 0 0 0 0 0 0 0 0 63
8:00 PM 0 0 1 3 24 11 7 0 0 0 0 0 0 0 0 0 0 46
9:00 PM 0 0 1 2 7 12 5 3 0 0 0 0 0 0 0 0 0 30
10:00 PM 0 0 0 2 6 15 2 2 0 0 0 0 0 0 0 0 0 27
11:00 PM 0 0 0 6 10 9 5 1 0 0 0 0 0 0 0 0 0 31
0 3 12 121 363 524 244 69 9 3 0 0 0 0 0 0 0
0.0% 0.2% 0.9% 9.0% 26.9% 38.9% 18.1% 5.1% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 31.7 mph Mean (Average) Speed 31.7 mph 85th Percentile 36.7 mph 10 mph Pace mph
95th Percentile 40.5 mph Percent in Pace 68.6 %
Saturday, February 1, 2025
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
26.1 - 36.1
Time
1,348Total
2 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, Between Tioga Loop & Yosemite Pl Date Range: 2/1/2025 to 2/1/2025
Site Code: 06
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 1 5 11 7 0 0 0 0 0 0 0 0 0 0 24
1:00 AM 0 0 0 1 1 3 2 0 0 0 0 0 0 0 0 0 0 7
2:00 AM 0 0 0 1 1 5 4 0 0 0 0 0 0 0 0 0 0 11
3:00 AM 0 0 0 0 2 2 1 0 0 0 0 0 0 0 0 0 0 5
4:00 AM 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 4
6:00 AM 0 0 0 1 3 3 1 0 0 0 0 0 0 0 0 0 0 8
7:00 AM 0 0 0 1 2 7 4 0 2 0 0 0 0 0 0 0 0 16
8:00 AM 0 0 1 1 7 15 6 3 0 0 0 0 0 0 0 0 0 33
9:00 AM 0 0 0 0 10 23 15 4 0 0 0 0 0 0 0 0 0 52
10:00 AM 0 0 4 3 15 33 9 2 0 0 0 0 0 0 0 0 0 66
11:00 AM 0 0 2 3 20 36 22 3 1 0 0 0 0 0 0 0 0 87
12:00 PM 0 1 0 1 15 29 17 2 0 0 0 0 0 0 0 0 0 65
1:00 PM 0 0 0 1 27 35 30 3 0 0 0 0 0 0 0 0 0 96
2:00 PM 0 0 1 8 17 37 14 1 1 0 0 0 0 0 0 0 0 79
3:00 PM 0 0 5 2 21 32 37 3 0 0 0 0 0 0 0 0 0 100
4:00 PM 0 0 0 2 16 29 30 6 2 0 0 0 0 0 0 0 0 85
5:00 PM 0 0 1 7 20 44 15 5 0 0 0 0 0 0 0 0 0 92
6:00 PM 0 0 1 6 24 27 11 3 0 0 0 0 0 0 0 0 0 72
7:00 PM 0 0 1 5 25 30 9 0 0 0 0 0 0 0 0 0 0 70
8:00 PM 0 0 0 0 16 25 8 2 0 0 0 0 0 0 0 0 0 51
9:00 PM 0 0 0 4 24 27 10 2 0 0 0 0 0 0 0 0 0 67
10:00 PM 0 0 0 2 16 26 14 0 0 0 0 0 0 0 0 0 0 58
11:00 PM 0 0 0 1 11 11 3 0 0 0 0 0 0 0 0 0 0 26
0 1 16 51 298 493 272 40 6 0 0 0 0 0 0 0 0
0.0% 0.1% 1.4% 4.3% 25.3% 41.9% 23.1% 3.4% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50th Percentile (Median) 32.1 mph Mean (Average) Speed 32.1 mph 85th Percentile 36.9 mph 10 mph Pace mph
95th Percentile 39.5 mph Percent in Pace 72.98 %
Saturday, February 1, 2025
Speed Range (mph)Time
1,177Total
Daily Percentile Speed Summary Speed Statistics
27.5 - 37.5
3 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, Between Tioga Loop & Yosemite Pl Date Range: 2/1/2025 to 2/1/2025
Site Code: 06
Eastbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 1 1 7 4 0 0 0 0 0 0 0 0 0 0 13
1:00 AM 0 0 1 5 3 2 1 1 0 0 0 0 0 0 0 0 0 13
2:00 AM 0 0 0 0 2 2 1 2 0 0 0 0 0 0 0 0 0 7
3:00 AM 0 0 0 1 1 4 1 0 0 0 0 0 0 0 0 0 0 7
4:00 AM 0 0 0 1 1 3 2 0 0 0 0 0 0 0 0 0 0 7
5:00 AM 0 0 0 0 5 6 1 1 0 0 0 0 0 0 0 0 0 13
6:00 AM 0 0 0 1 9 13 3 2 0 0 0 0 0 0 0 0 0 28
7:00 AM 0 0 0 4 7 8 12 5 1 0 0 0 0 0 0 0 0 37
8:00 AM 0 0 0 4 16 33 23 4 0 0 0 0 0 0 0 0 0 80
9:00 AM 0 0 1 13 13 44 15 5 0 1 0 0 0 0 0 0 0 92
10:00 AM 0 1 0 8 27 38 16 3 2 0 0 0 0 0 0 0 0 95
11:00 AM 0 0 1 7 30 48 19 3 0 0 0 0 0 0 0 0 0 108
12:00 PM 0 0 3 5 34 44 17 6 1 0 0 0 0 0 0 0 0 110
1:00 PM 0 1 1 13 39 36 19 4 0 1 0 0 0 0 0 0 0 114
2:00 PM 0 0 0 10 19 36 22 7 1 0 0 0 0 0 0 0 0 95
3:00 PM 0 1 1 11 26 35 22 6 2 1 0 0 0 0 0 0 0 105
4:00 PM 0 0 0 4 17 24 16 9 1 0 0 0 0 0 0 0 0 71
5:00 PM 0 0 0 14 31 36 11 4 0 0 0 0 0 0 0 0 0 96
6:00 PM 0 0 1 3 18 29 7 1 1 0 0 0 0 0 0 0 0 60
7:00 PM 0 0 1 3 17 29 13 0 0 0 0 0 0 0 0 0 0 63
8:00 PM 0 0 1 3 24 11 7 0 0 0 0 0 0 0 0 0 0 46
9:00 PM 0 0 1 2 7 12 5 3 0 0 0 0 0 0 0 0 0 30
10:00 PM 0 0 0 2 6 15 2 2 0 0 0 0 0 0 0 0 0 27
11:00 PM 0 0 0 6 10 9 5 1 0 0 0 0 0 0 0 0 0 31
0 3 12 121 363 524 244 69 9 3 0 0 0 0 0 0 0
0.0% 0.2% 0.9% 9.0% 26.9% 38.9% 18.1% 5.1% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 31.7 mph Mean (Average) Speed 31.7 mph 85th Percentile 36.7 mph 10 mph Pace 26.1 - 36.1 mph 95th Percentile 40.5 mph Percent in Pace 68.6 %
Total Study Average
Time
Total 1,348
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics 4 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, Between Tioga Loop & Yosemite Pl Date Range: 2/1/2025 to 2/1/2025
Site Code: 06
Westbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume 12:00 AM 0 0 0 1 5 11 7 0 0 0 0 0 0 0 0 0 0 24
1:00 AM 0 0 0 1 1 3 2 0 0 0 0 0 0 0 0 0 0 7
2:00 AM 0 0 0 1 1 5 4 0 0 0 0 0 0 0 0 0 0 11
3:00 AM 0 0 0 0 2 2 1 0 0 0 0 0 0 0 0 0 0 5
4:00 AM 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 4
6:00 AM 0 0 0 1 3 3 1 0 0 0 0 0 0 0 0 0 0 8
7:00 AM 0 0 0 1 2 7 4 0 2 0 0 0 0 0 0 0 0 16
8:00 AM 0 0 1 1 7 15 6 3 0 0 0 0 0 0 0 0 0 33
9:00 AM 0 0 0 0 10 23 15 4 0 0 0 0 0 0 0 0 0 52
10:00 AM 0 0 4 3 15 33 9 2 0 0 0 0 0 0 0 0 0 66
11:00 AM 0 0 2 3 20 36 22 3 1 0 0 0 0 0 0 0 0 87
12:00 PM 0 1 0 1 15 29 17 2 0 0 0 0 0 0 0 0 0 65
1:00 PM 0 0 0 1 27 35 30 3 0 0 0 0 0 0 0 0 0 96
2:00 PM 0 0 1 8 17 37 14 1 1 0 0 0 0 0 0 0 0 79
3:00 PM 0 0 5 2 21 32 37 3 0 0 0 0 0 0 0 0 0 100
4:00 PM 0 0 0 2 16 29 30 6 2 0 0 0 0 0 0 0 0 85
5:00 PM 0 0 1 7 20 44 15 5 0 0 0 0 0 0 0 0 0 92
6:00 PM 0 0 1 6 24 27 11 3 0 0 0 0 0 0 0 0 0 72
7:00 PM 0 0 1 5 25 30 9 0 0 0 0 0 0 0 0 0 0 70
8:00 PM 0 0 0 0 16 25 8 2 0 0 0 0 0 0 0 0 0 51
9:00 PM 0 0 0 4 24 27 10 2 0 0 0 0 0 0 0 0 0 67
10:00 PM 0 0 0 2 16 26 14 0 0 0 0 0 0 0 0 0 0 58
11:00 PM 0 0 0 1 11 11 3 0 0 0 0 0 0 0 0 0 0 26
0 1 16 51 298 493 272 40 6 0 0 0 0 0 0 0 0
0.0% 0.1% 1.4% 4.3% 25.3% 41.9% 23.1% 3.4% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Note: Average only condsidered on days with 24-hours of data. 50th Percentile (Median) 32.1 mph Mean (Average) Speed 32.1 mph 85th Percentile 36.9 mph 10 mph Pace 27.5 - 37.5 mph 95th Percentile 39.5 mph Percent in Pace 73.0 %
Total Study Percentile Speed Summary Total Study Speed Statistics Time
Total 1,177
Total Study Average
Speed Range (mph)
5 Project Manager: (415) 310-6469
[email protected]
Location: John Muir Pkwy, Between Tioga Loop & Yosemite Pl Date Range: 2/1/2025 - 2/7/2025
Site Code: 06
EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total EB WB Total 12:00 AM 13 24 37 - - - - - - - - - - - - - - - - - -
1:00 AM 13 7 20 - - - - - - - - - - - - - - - - - -
2:00 AM 7 11 18 - - - - - - - - - - - - - - - - - -
3:00 AM 7 5 12 - - - - - - - - - - - - - - - - - -
4:00 AM 7 3 10 - - - - - - - - - - - - - - - - - -
5:00 AM 13 4 17 - - - - - - - - - - - - - - - - - -
6:00 AM 28 8 36 - - - - - - - - - - - - - - - - - -
7:00 AM 37 16 53 - - - - - - - - - - - - - - - - - -
8:00 AM 80 33 113 - - - - - - - - - - - - - - - - - -
9:00 AM 92 52 144 - - - - - - - - - - - - - - - - - -
10:00 AM 95 66 161 - - - - - - - - - - - - - - - - - -
11:00 AM 108 87 195 - - - - - - - - - - - - - - - - - - 12:00 PM 110 65 175 - - - - - - - - - - - - - - - - - - 1:00 PM 114 96 210 - - - - - - - - - - - - - - - - - -
2:00 PM 95 79 174 - - - - - - - - - - - - - - - - - -
3:00 PM 105 100 205 - - - - - - - - - - - - - - - - - - 4:00 PM 71 85 156 - - - - - - - - - - - - - - - - - -
5:00 PM 96 92 188 - - - - - - - - - - - - - - - - - -
6:00 PM 60 72 132 - - - - - - - - - - - - - - - - - -
7:00 PM 63 70 133 - - - - - - - - - - - - - - - - - -
8:00 PM 46 51 97 - - - - - - - - - - - - - - - - - -
9:00 PM 30 67 97 - - - - - - - - - - - - - - - - - -
10:00 PM 27 58 85 - - - - - - - - - - - - - - - - - -
11:00 PM 31 26 57 - - - - - - - - - - - - - - - - - -
Total 1,348 1,177 2,525 - - - - - - - - - - - - - - - - - - Percent 53% 47% - - - - - - - - - - - -
AM Peak 11:00 11:00 11:00 - - - - - - - - - - - - - - - - - - Vol. 108 87 195 - - - - - - - - - - - - - - - - - -
PM Peak 13:00 15:00 13:00 - - - - - - - - - - - - - - - - - - Vol. 114 100 210 - - - - - - - - - - - - - - - - - -
1. Mid-week average includes data between Tuesday and Thursday.
Time
Saturday Sunday Monday Tuesday Wednesday Thursday Friday Mid-Week Average2/7/20252/1/2025 2/2/2025 2/3/2025 2/4/2025 2/5/2025 2/6/2025 1 Project Manager: (415) 310-6469
[email protected]
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 1% 0.83
WB 4% 0.66
NB -- --
SB 0% 0.78
TOTAL 2% 0.89
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:30 AM 0 0 36 0 0 0 4 3 0 0 0 0 0 7 0 0 50 0
7:45 AM 0 1 41 0 0 0 13 1 0 0 0 0 0 8 0 0 64 0
8:00 AM 0 0 25 0 2 0 17 4 0 0 0 0 0 7 0 0 55 0
8:15 AM 1 0 35 0 2 0 20 5 0 0 0 0 0 3 0 0 66 235
1 1 137 0 4 0 54 13 0 0 0 0 0 25 0 0 235
0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0 5
0% 0% 1% - 0% - 6% 0% - - - - - 0% - - 2%
EB WB NB SB EB WB NB SB E W N S
7:30 AM 0 0 0 0 1 0 0 0 0 0 0 1
7:45 AM 1 2 0 0 0 0 0 0 0 2 1 1
8:00 AM 1 0 0 0 0 0 0 0 0 1 1 1
8:15 AM 0 1 0 0 0 0 0 0 0 0 4 3
Peak Hour 2 3 0 0 1 0 0 0 0 3 6 65 1 15
7 1 0 3
1 0
0 1 1
3 0 4
Bicycles Pedestrians (Crossing Leg)
Total Total Total
Interval
Start
Heavy Vehicle Totals
Note: For complete count summary (all intervals), see following pages. ** Heavy Vehicle Classifications include FHWA Classes 4-13. ** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Peak Hour
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
15-min
Total
7:30 AM to 8:30 AM
1/9/2025
7:00 AM to 9:00 AM
1 0
0 0
0 0
6 6
3 0
N
Tioga Loop
John Muir Pkwy
John Muir Pkwy
Tioga Loop
John Muir Pkwy
235TEV:
0.890PHF 0
25 25
14 0
13 54 71
166
4 137
1139
55 1
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 21 0 0 0 4 1 0 0 0 0 0 3 0 0 29 0
7:15 AM 0 0 39 0 0 0 1 2 0 0 0 0 0 3 0 0 45 0
7:30 AM 0 0 36 0 0 0 4 3 0 0 0 0 0 7 0 0 50 0
7:45 AM 0 1 41 0 0 0 13 1 0 0 0 0 0 8 0 0 64 188
8:00 AM 0 0 25 0 2 0 17 4 0 0 0 0 0 7 0 0 55 214
8:15 AM 1 0 35 0 2 0 20 5 0 0 0 0 0 3 0 0 66 235
8:30 AM 0 0 15 0 1 0 10 7 0 0 0 0 0 4 0 0 37 222
8:45 AM 0 0 22 0 1 0 17 6 0 0 0 0 0 5 0 1 52 210
Count Total 1 1 234 0 6 0 86 29 0 0 0 0 0 40 0 1 398
1 1 137 0 4 0 54 13 0 0 0 0 0 25 0 0 235
0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0 5
0% 0% 1% - 0% - 6% 0% - - - - - 0% - - 2%
EB WB NB SB EB WB NB SB E W N S
7:00 AM 1 0 0 0 0 0 0 0 0 0 0 1
7:15 AM 1 2 0 0 0 0 0 0 0 1 0 0
7:30 AM 0 0 0 0 1 0 0 0 0 0 0 1
7:45 AM 1 2 0 0 0 0 0 0 0 2 1 1
8:00 AM 1 0 0 0 0 0 0 0 0 1 1 1
8:15 AM 0 1 0 0 0 0 0 0 0 0 4 3
8:30 AM 1 0 0 0 1 0 0 0 0 0 3 2
8:45 AM 0 1 0 0 0 0 0 0 0 0 5 3
Count Total 5 6 0 0 2 0 0 0 0 4 14 12
Peak Hour 2 3 0 0 1 0 0 0 0 3 6 6
11 2 30
5 1 15
1 1 5
1 0 8
1 0 3
1 0 7
0 1 1
3 0 4
1 0 1
3 0 1
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
7:15 AM 0 0 1 0 0 0 1 1 0 0 0 0 0 0 0 0 3 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0 3 7
8:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 7
8:15 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 5
8:30 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 6
8:45 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 4
Count Total 0 0 5 0 0 0 5 1 0 0 0 0 0 0 0 0 11
Pk Hr Heavy 0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0 5
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:30 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Count Total 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
Pk Hr Bike 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 1% 0.74
WB 1% 0.84
NB -- --
SB 0% 0.88
TOTAL 1% 0.95
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:30 PM 0 1 36 0 0 0 23 2 0 0 0 0 0 3 0 0 65 0
4:45 PM 0 1 27 0 0 0 33 3 0 0 0 0 0 3 0 1 68 0
5:00 PM 0 0 19 0 1 0 30 3 0 0 0 0 0 3 0 1 57 0
5:15 PM 0 0 25 0 0 0 33 7 0 0 0 0 0 3 0 0 68 258
0 2 107 0 1 0 119 15 0 0 0 0 0 12 0 2 258
0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2
- 0% 1% - 0% - 1% 0% - - - - - 0% - 0% 1%
EB WB NB SB EB WB NB SB E W N S
4:30 PM 0 0 0 0 0 0 0 0 0 0 2 5
4:45 PM 0 1 0 0 0 0 0 0 0 1 6 6
5:00 PM 1 0 0 0 0 0 0 0 0 3 7 3
5:15 PM 0 0 0 0 0 0 0 0 0 1 4 6
Peak Hour 1 1 0 0 0 0 0 0 0 5 19 202 0 44
11 1 0 13
0 0
0 0 7
1 0 13
Bicycles Pedestrians (Crossing Leg)
Total Total Total
Interval
Start
Heavy Vehicle Totals
Note: For complete count summary (all intervals), see following pages. ** Heavy Vehicle Classifications include FHWA Classes 4-13. ** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Peak Hour
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
15-min
Total
4:30 PM to 5:30 PM
1/9/2025
4:00 PM to 6:00 PM
0 0
0 0
0 0
19 20
5 0
N
Tioga Loop
John Muir Pkwy
John Muir Pkwy
Tioga Loop
John Muir Pkwy
258TEV:
0.948PHF 2
12 14
17 0
15 119 135
120
1 107
2109
121
0 Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:00 PM 0 1 20 0 0 0 27 3 0 0 0 0 0 4 0 0 55 0
4:15 PM 0 0 21 0 1 0 28 5 0 0 0 0 0 2 0 0 57 0
4:30 PM 0 1 36 0 0 0 23 2 0 0 0 0 0 3 0 0 65 0
4:45 PM 0 1 27 0 0 0 33 3 0 0 0 0 0 3 0 1 68 245
5:00 PM 0 0 19 0 1 0 30 3 0 0 0 0 0 3 0 1 57 247
5:15 PM 0 0 25 0 0 0 33 7 0 0 0 0 0 3 0 0 68 258
5:30 PM 0 1 19 0 0 0 21 5 0 0 0 0 0 1 0 1 48 241
5:45 PM 0 0 25 0 0 0 33 6 0 0 0 0 0 2 0 0 66 239
Count Total 0 4 192 0 2 0 228 34 0 0 0 0 0 21 0 3 484
0 2 107 0 1 0 119 15 0 0 0 0 0 12 0 2 258
0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2
- 0% 1% - 0% - 1% 0% - - - - - 0% - 0% 1%
EB WB NB SB EB WB NB SB E W N S
4:00 PM 1 0 0 0 0 0 0 0 0 1 2 2
4:15 PM 1 1 0 0 0 0 0 0 0 1 2 4
4:30 PM 0 0 0 0 0 0 0 0 0 0 2 5
4:45 PM 0 1 0 0 0 0 0 0 0 1 6 6
5:00 PM 1 0 0 0 0 0 0 0 0 3 7 3
5:15 PM 0 0 0 0 0 0 0 0 0 1 4 6
5:30 PM 1 1 0 0 0 0 0 0 0 0 4 2
5:45 PM 0 1 0 0 0 0 0 0 0 0 4 0
Count Total 4 4 0 0 0 0 0 0 0 7 31 28
Peak Hour 1 1 0 0 0 0 0 0 0 5 19 20
8 0 66
2 0 44
2 0 6
1 0 4
1 0 13
0 0 11
0 0 7
1 0 13
1 0 5
2 0 7
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
4:15 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 4
5:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
5:30 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 4
5:45 PM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 4
Count Total 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 0 8
Pk Hr Heavy 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Count Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Pk Hr Bike 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
Interval
Start
John Muir Pkwy John Muir Pkwy n/a Tioga Loop
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 1% 0.88
WB 3% 0.79
NB 0% 0.79
SB 0% 0.62
TOTAL 1% 0.92
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:30 AM 0 0 36 7 0 5 7 3 0 0 0 18 0 7 1 0 84 0
7:45 AM 0 0 38 10 0 9 14 0 0 2 0 22 0 6 7 0 108 0
8:00 AM 0 0 30 7 1 4 21 6 0 2 0 15 0 12 11 0 109 0
8:15 AM 0 0 35 5 0 2 21 8 0 2 0 15 0 12 1 0 101 402
0 0 139 29 1 20 63 17 0 6 0 70 0 37 20 0 402
0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0 5
- - 1% 0% 0% 0% 5% 0% - 0% - 0% - 0% 0% - 1%
EB WB NB SB EB WB NB SB E W N S
7:30 AM 0 0 0 0 1 0 0 0 0 0 0 0
7:45 AM 1 2 0 0 0 0 0 0 1 0 1 1
8:00 AM 1 0 0 0 0 0 0 0 1 0 1 0
8:15 AM 0 1 0 0 0 0 0 0 0 1 2 1
Peak Hour 2 3 0 0 1 0 0 0 2 1 4 25 1 9
4 1 0 2
1 0
0 1 0
3 0 3
Bicycles Pedestrians (Crossing Leg)
Total Total Total
Interval
Start
Heavy Vehicle Totals
Note: For complete count summary (all intervals), see following pages. ** Heavy Vehicle Classifications include FHWA Classes 4-13. ** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Peak Hour
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
15-min
Total
7:30 AM to 8:30 AM
1/9/2025
7:00 AM to 9:00 AM
0 1
0 0
0 0
0 0
0 0
0 0
4 2
1 2
N
Yosemite Pl
John Muir Pkwy
John Muir PkwyTsushima St
John Muir Pkwy
Yosemite Pl
402TEV:
0.9220PHF: 0
20 37
57 17
0 17
63 20
101
2471
70 0
6 76
69 0
29 139
0 168
69 0
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 24 0 1 1 6 1 0 0 0 12 0 5 2 0 52 0
7:15 AM 0 0 38 2 0 4 3 1 0 0 0 19 0 6 2 0 75 0
7:30 AM 0 0 36 7 0 5 7 3 0 0 0 18 0 7 1 0 84 0
7:45 AM 0 0 38 10 0 9 14 0 0 2 0 22 0 6 7 0 108 319
8:00 AM 0 0 30 7 1 4 21 6 0 2 0 15 0 12 11 0 109 376
8:15 AM 0 0 35 5 0 2 21 8 0 2 0 15 0 12 1 0 101 402
8:30 AM 1 0 17 1 0 5 17 12 0 1 1 12 0 6 0 0 73 391
8:45 AM 0 0 26 1 1 6 19 7 0 2 0 10 0 3 1 0 76 359
Count Total 1 0 244 33 3 36 108 38 0 9 1 123 0 57 25 0 678 0 0 139 29 1 20 63 17 0 6 0 70 0 37 20 0 402
0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0 5
- - 1% 0% 0% 0% 5% 0% - 0% - 0% - 0% 0% - 1%
EB WB NB SB EB WB NB SB E W N S
7:00 AM 1 0 0 0 0 0 0 0 2 0 0 1
7:15 AM 1 2 0 1 0 0 0 0 1 0 0 0
7:30 AM 0 0 0 0 1 0 0 0 0 0 0 0
7:45 AM 1 2 0 0 0 0 0 0 1 0 1 1
8:00 AM 1 0 0 0 0 0 0 0 1 0 1 0
8:15 AM 0 1 0 0 0 0 0 0 0 1 2 1
8:30 AM 1 0 0 0 1 1 0 0 0 1 6 4
8:45 AM 0 1 2 0 0 0 0 0 0 0 4 0
Count Total 5 6 2 1 2 1 0 0 5 2 14 7
Peak Hour 2 3 0 0 1 0 0 0 2 1 4 2
14 3 28
5 1 9
1 2 11
3 0 4
1 0 2
1 0 4
0 1 0
3 0 3
1 0 3
4 0 1
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
7:15 AM 0 0 1 0 0 0 2 0 0 0 0 0 0 1 0 0 4 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0 3 8
8:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 8
8:15 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 5
8:30 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 6
8:45 AM 0 0 0 0 0 1 0 0 0 1 0 1 0 0 0 0 3 6
Count Total 0 0 5 0 0 1 5 0 0 1 0 1 0 1 0 0 14
Pk Hr Heavy 0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0 5
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:30 AM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 2
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
Count Total 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 3
Pk Hr Bike 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 2% 0.76
WB 0% 0.88
NB 0% 0.84
SB 0% 0.71
TOTAL 1% 0.96
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:30 PM 0 0 36 4 0 17 26 2 0 0 2 8 0 0 5 0 100 0
4:45 PM 0 0 27 3 1 16 34 7 0 1 1 8 0 3 2 0 103 0
5:00 PM 0 0 22 1 2 22 28 10 0 6 0 8 0 4 3 0 106 0
5:15 PM 0 0 28 0 0 12 37 4 0 3 0 10 0 3 0 0 97 406
0 0 113 8 3 67 125 23 0 10 3 34 0 10 10 0 406
0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 3
- - 2% 0% 0% 0% 1% 0% - 0% 0% 0% - 0% 0% - 1%
EB WB NB SB EB WB NB SB E W N S
4:30 PM 1 0 0 0 1 0 0 0 1 3 2 2
4:45 PM 0 1 0 0 0 0 0 0 0 1 2 0
5:00 PM 1 0 0 0 0 0 0 0 1 0 2 0
5:15 PM 0 0 0 0 0 0 0 0 2 1 6 5
Peak Hour 2 1 0 0 1 0 0 0 4 5 12 73 1 28
14 1 0 3
0 0
1 1 8
1 0 3
Bicycles Pedestrians (Crossing Leg)
Total Total Total
Interval
Start
Heavy Vehicle Totals
Note: For complete count summary (all intervals), see following pages. ** Heavy Vehicle Classifications include FHWA Classes 4-13. ** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Peak Hour
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
15-min
Total
4:30 PM to 5:30 PM
1/9/2025
4:00 PM to 6:00 PM
1 0
0 0
0 0
0 0
0 0
0 0
12 7
5 4
N
Yosemite Pl
John Muir Pkwy
John Muir PkwyTsushima St
John Muir Pkwy
Yosemite Pl
406TEV:
0.9575PHF: 0
10 10
20 26
0 23
125
67 218
1603
34 3
10 47
85 0
8 113
0 121
135 0
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:00 PM 0 0 24 0 0 9 29 4 0 1 1 14 0 4 0 1 87 0
4:15 PM 0 0 18 3 1 10 33 4 0 2 1 10 0 4 0 0 86 0
4:30 PM 0 0 36 4 0 17 26 2 0 0 2 8 0 0 5 0 100 0
4:45 PM 0 0 27 3 1 16 34 7 0 1 1 8 0 3 2 0 103 376
5:00 PM 0 0 22 1 2 22 28 10 0 6 0 8 0 4 3 0 106 395
5:15 PM 0 0 28 0 0 12 37 4 0 3 0 10 0 3 0 0 97 406
5:30 PM 0 0 19 1 0 12 26 6 0 2 1 9 0 4 2 1 83 389
5:45 PM 0 0 26 1 1 13 36 9 0 2 0 10 0 2 0 0 100 386
Count Total 0 0 200 13 5 111 249 46 0 17 6 77 0 24 12 2 762 0 0 113 8 3 67 125 23 0 10 3 34 0 10 10 0 406
0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 3
- - 2% 0% 0% 0% 1% 0% - 0% 0% 0% - 0% 0% - 1%
EB WB NB SB EB WB NB SB E W N S
4:00 PM 1 0 0 0 0 0 0 1 1 0 1 3
4:15 PM 0 1 0 0 0 1 0 0 0 2 0 0
4:30 PM 1 0 0 0 1 0 0 0 1 3 2 2
4:45 PM 0 1 0 0 0 0 0 0 0 1 2 0
5:00 PM 1 0 0 0 0 0 0 0 1 0 2 0
5:15 PM 0 0 0 0 0 0 0 0 2 1 6 5
5:30 PM 1 1 0 0 0 0 0 0 0 0 2 1
5:45 PM 0 1 0 0 0 0 0 0 0 0 0 0
Count Total 4 4 0 0 1 1 0 1 5 7 15 11
Peak Hour 2 1 0 0 1 0 0 0 4 5 12 7
8 3 38
3 1 28
2 0 3
1 0 0
1 0 3
0 0 14
1 1 8
1 0 3
1 1 5
1 1 2
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
4:15 PM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0
4:30 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
4:45 PM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 4
5:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:30 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 4
5:45 PM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 4
Count Total 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 0 8
Pk Hr Heavy 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 3
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0
4:15 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 0
4:30 PM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Count Total 0 0 0 1 0 1 0 0 0 0 0 0 0 0 1 0 3
Pk Hr Bike 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
Interval
Start
John Muir Pkwy John Muir Pkwy Tsushima St Yosemite Pl
15-min
Total
Robert Donnell
(415) 757-7714 [email protected]
Date: 01/09/2025
Location: Tioga Loop_John Muir Pkwy
Site Code: 01
Time: 7AM- 6PM
Time NB SB Total Total Time NB SB Total Total
7:00 0 0 0 7:00 0 0 0
7:15 1 0 1 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0
7:45 1 1 2 7:45 0 0 0
8:00 0 1 1 8:00 0 0 0
8:15 0 0 0 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0
8:45 0 0 0 8:45 0 0 0
9:00 0 1 1 9:00 0 0 0
9:15 0 0 0 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0
9:45 3 0 3 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0
10:15 2 1 3 10:15 0 0 0
10:30 2 0 2 10:30 0 0 0
10:45 0 0 0 10:45 0 0 0
11:00 0 1 1 11:00 1 0 1
11:15 4 0 4 11:15 0 0 0
11:30 0 0 0 11:30 0 0 0
11:45 0 0 0 11:45 0 0 0
12:00 0 0 0 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0
12:30 0 0 0 12:30 0 0 0
12:45 1 0 1 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0
13:15 1 1 2 13:15 0 0 0
13:30 0 2 2 13:30 0 1 1
13:45 1 0 1 13:45 0 0 0
14:00 0 0 0 14:00 0 0 0
14:15 2 0 2 14:15 0 0 0
14:30 0 3 3 14:30 0 0 0
14:45 0 0 0 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0
16:00 0 1 1 16:00 0 0 0
16:15 1 0 1 16:15 0 0 0
16:30 0 0 0 16:30 0 0 0
16:45 1 0 1 16:45 0 0 0
17:00 0 3 3 17:00 0 0 0
17:15 0 1 1 17:15 0 0 0
17:30 0 0 0 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0
Total: 20 16 Total: 1 1
Pedestrians Bikes on Crosswalk
West Leg - John Muir Pkwy
36 4
3 4
3 0
5 5
1 1
5 5
West Leg - John Muir Pkwy
0 0
2 0
0 0
1 0
1 0
0 0
Date: 01/11/2025
Location: Tioga Loop_John Muir Pkwy
Site Code: 01
Time: 7AM- 6PM
Time NB SB Total Total Time NB SB Total Total
7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0
7:45 0 0 0 7:45 0 0 0
8:00 0 1 1 8:00 0 0 0
8:15 0 1 1 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0
8:45 0 0 0 8:45 0 0 0
9:00 3 0 3 9:00 0 0 0
9:15 0 2 2 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0
9:45 1 0 1 9:45 0 0 0
10:00 0 1 1 10:00 0 0 0
10:15 0 0 0 10:15 0 0 0
10:30 1 0 1 10:30 0 0 0
10:45 0 2 2 10:45 0 0 0
11:00 0 3 3 11:00 0 0 0
11:15 0 2 2 11:15 0 0 0
11:30 0 0 0 11:30 0 0 0
11:45 0 0 0 11:45 0 0 0
12:00 2 1 3 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0
12:30 0 0 0 12:30 0 0 0
12:45 0 0 0 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0
13:15 3 0 3 13:15 0 0 0
13:30 0 0 0 13:30 0 0 0
13:45 0 0 0 13:45 0 0 0
14:00 0 0 0 14:00 0 0 0
14:15 0 2 2 14:15 0 0 0
14:30 0 0 0 14:30 0 0 0
14:45 0 2 2 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0
15:30 0 1 1 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0
16:00 0 3 3 16:00 0 0 0
16:15 2 0 2 16:15 0 0 0
16:30 1 1 2 16:30 0 0 0
16:45 0 0 0 16:45 0 0 0
17:00 1 0 1 17:00 0 0 0
17:15 0 0 0 17:15 0 0 0
17:30 3 0 3 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0
Total: 17 22 Total: 0 0
4 0
39 0
4 0
1 0
7 0
5 0
3 0
3 0
2 0
6 0
4 0
Pedestrians Bikes on Crosswalk
West Leg - John Muir Pkwy West Leg - John Muir Pkwy
0 0
Date: 01/11/2025
Location: Tioga Loop_John Muir Pkwy
Site Code: 01
Time: 7AM- 6PM
Time Left Thru Right Time Left Thru Right Time Left Thru Right Time Left Thru Right 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0 7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0 7:30 0 0 0 7:30 0 0 0
7:45 0 0 0 7:45 0 0 0 7:45 0 0 0 7:45 0 0 0
8:00 0 0 0 8:00 0 0 0 8:00 0 0 0 8:00 0 1 0
8:15 0 0 0 8:15 0 0 0 8:15 0 0 0 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0 8:30 0 0 0 8:30 0 0 0
8:45 0 0 0 8:45 0 0 0 8:45 0 0 0 8:45 0 0 0
9:00 0 0 0 9:00 0 0 0 9:00 0 0 0 9:00 0 0 0
9:15 0 0 0 9:15 0 0 0 9:15 0 0 0 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0 9:30 0 0 0 9:30 0 0 0
9:45 0 0 0 9:45 0 0 0 9:45 0 0 0 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0 10:00 0 0 0 10:00 0 0 0
10:15 0 0 0 10:15 0 0 0 10:15 0 0 0 10:15 0 0 0
10:30 0 0 0 10:30 0 0 0 10:30 0 0 0 10:30 0 0 0
10:45 0 0 0 10:45 0 0 0 10:45 0 0 0 10:45 0 0 0
11:00 0 0 0 11:00 0 0 0 11:00 0 0 0 11:00 0 0 0
11:15 0 0 0 11:15 0 1 0 11:15 0 0 0 11:15 0 2 0
11:30 0 0 0 11:30 0 1 0 11:30 0 0 0 11:30 0 0 0
11:45 0 0 0 11:45 0 0 0 11:45 0 0 0 11:45 0 0 0
12:00 0 0 1 12:00 0 0 0 12:00 0 0 0 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0 12:15 0 0 0 12:15 0 0 0
12:30 0 0 0 12:30 0 0 0 12:30 0 0 0 12:30 0 0 0
12:45 0 0 0 12:45 0 0 0 12:45 0 0 0 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0 13:00 0 0 0 13:00 0 0 0
13:15 0 0 0 13:15 0 0 0 13:15 0 0 0 13:15 0 0 0
13:30 0 0 0 13:30 0 0 0 13:30 0 0 0 13:30 0 1 0
13:45 0 0 1 13:45 0 0 0 13:45 0 0 0 13:45 0 1 0
14:00 0 0 0 14:00 0 0 0 14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0 14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 0 2 0 14:30 0 0 0 14:30 1 0 0
14:45 0 0 0 14:45 0 0 0 14:45 0 0 0 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0 15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0 15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0 15:30 0 0 0 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0 15:45 0 0 0 15:45 0 0 0
16:00 0 0 0 16:00 0 0 0 16:00 0 0 0 16:00 0 0 0
16:15 0 0 0 16:15 0 0 0 16:15 0 0 0 16:15 0 0 0
16:30 0 0 0 16:30 0 0 0 16:30 0 0 0 16:30 0 0 0
16:45 0 0 0 16:45 0 0 0 16:45 0 0 0 16:45 0 0 0
17:00 0 0 0 17:00 0 0 0 17:00 0 0 0 17:00 0 0 0
17:15 0 0 0 17:15 0 0 0 17:15 0 0 0 17:15 0 0 0
17:30 0 0 0 17:30 0 0 0 17:30 0 0 0 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0 17:45 0 0 0 17:45 0 0 0
Total: 0 0 2 Total: 0 4 0 Total: 0 0 0 Total: 1 5 0
West Leg - John Muir PkwyNorth Leg - Tioga Loop East Leg - John Muir Pkwy South Leg - N/A
Date: 01/11/2025
Location: Yosemite Pl/Tsushima St_John Muir Pkwy
Site Code: 02
Time: 7AM- 6PM
Time NB SB Total Total Time NB SB Total Total Time NB SB Total Total Time NB SB Total Total 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0 7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0 7:30 0 0 0 7:30 0 0 0
7:45 0 1 1 7:45 0 0 0 7:45 0 0 0 7:45 0 0 0
8:00 0 0 0 8:00 0 0 0 8:00 3 0 3 8:00 0 0 0
8:15 0 0 0 8:15 0 0 0 8:15 0 0 0 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0 8:30 0 0 0 8:30 0 0 0
8:45 0 0 0 8:45 0 0 0 8:45 0 0 0 8:45 0 0 0
9:00 0 0 0 9:00 0 0 0 9:00 1 0 1 9:00 0 0 0
9:15 2 0 2 9:15 0 0 0 9:15 1 0 1 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0 9:30 0 0 0 9:30 0 0 0
9:45 0 0 0 9:45 0 0 0 9:45 1 0 1 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0 10:00 0 2 2 10:00 0 0 0
10:15 0 0 0 10:15 0 0 0 10:15 1 0 1 10:15 0 0 0
10:30 0 0 0 10:30 0 0 0 10:30 1 1 2 10:30 0 0 0
10:45 0 1 1 10:45 0 0 0 10:45 1 0 1 10:45 0 0 0
11:00 3 0 3 11:00 0 0 0 11:00 2 0 2 11:00 0 0 0
11:15 0 0 0 11:15 0 0 0 11:15 2 0 2 11:15 0 0 0
11:30 0 0 0 11:30 0 0 0 11:30 0 0 0 11:30 0 0 0
11:45 0 0 0 11:45 0 0 0 11:45 0 2 2 11:45 0 0 0
12:00 0 0 0 12:00 0 0 0 12:00 1 0 1 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0 12:15 0 1 1 12:15 0 0 0
12:30 0 1 1 12:30 0 0 0 12:30 1 0 1 12:30 0 0 0
12:45 0 0 0 12:45 0 0 0 12:45 0 1 1 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0 13:00 0 1 1 13:00 0 0 0
13:15 0 0 0 13:15 0 0 0 13:15 1 2 3 13:15 0 0 0
13:30 1 0 1 13:30 0 0 0 13:30 0 0 0 13:30 0 0 0
13:45 0 0 0 13:45 0 0 0 13:45 0 0 0 13:45 0 0 0
14:00 1 0 1 14:00 0 0 0 14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0 14:15 0 0 0 14:15 0 0 0
14:30 0 1 1 14:30 0 0 0 14:30 0 0 0 14:30 0 0 0
14:45 1 1 2 14:45 0 0 0 14:45 0 1 1 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0 15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0 15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0 15:30 0 1 1 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0 15:45 1 0 1 15:45 0 0 0
16:00 0 0 0 16:00 0 0 0 16:00 0 0 0 16:00 0 2 2
16:15 0 0 0 16:15 0 0 0 16:15 3 0 3 16:15 0 0 0
16:30 0 0 0 16:30 0 0 0 16:30 1 0 1 16:30 0 0 0
16:45 0 0 0 16:45 1 0 1 16:45 1 1 2 16:45 0 0 0
17:00 0 0 0 17:00 0 0 0 17:00 0 0 0 17:00 0 0 0
17:15 2 0 2 17:15 0 0 0 17:15 0 2 2 17:15 0 0 0
17:30 0 0 0 17:30 0 0 0 17:30 0 1 1 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0 17:45 0 2 2 17:45 0 0 0
Total: 10 5 Total: 1 0 Total: 22 18 Total: 0 2
Pedestrians Bikes on Crosswalk Pedestrians Bikes on Crosswalk East Leg - John Muir Pkwy East Leg - John Muir Pkwy West Leg - John Muir Pkwy West Leg - John Muir Pkwy 1 0 0 0
0 0 3 0
2 0 3 0
1 0 6 0
3 0 6 0
1 0 4 0
1 0 4 0
4 0 1 0
0 0 2 0
0 1 6 2
2 0 5 0
15 1 40 2
1 3
5 7
9 7
5 5
5 2
9 Date: 01/11/2025
Location: Yosemite Pl/Tsushima St_John Muir Pkwy
Site Code: 02
Time: 7AM- 6PM
Time Left Thru Right Time Left Thru Right Time Left Thru Right Time Left Thru Right 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0 7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0 7:30 0 0 0 7:30 0 0 0
7:45 0 0 0 7:45 0 0 0 7:45 0 0 0 7:45 0 0 0
8:00 0 0 0 8:00 0 0 0 8:00 0 0 0 8:00 0 0 1
8:15 0 0 0 8:15 0 0 0 8:15 0 0 0 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0 8:30 0 0 0 8:30 0 0 0
8:45 0 0 0 8:45 0 0 0 8:45 0 0 0 8:45 0 0 0
9:00 0 0 0 9:00 0 0 0 9:00 0 0 0 9:00 0 0 0
9:15 0 0 0 9:15 0 0 0 9:15 0 0 0 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0 9:30 0 0 0 9:30 0 0 0
9:45 0 0 0 9:45 0 0 0 9:45 0 0 0 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0 10:00 0 0 0 10:00 0 0 1
10:15 0 0 0 10:15 0 0 0 10:15 0 0 0 10:15 0 0 0
10:30 0 0 0 10:30 0 0 0 10:30 0 0 0 10:30 0 0 0
10:45 0 0 0 10:45 0 0 0 10:45 1 0 0 10:45 0 0 0
11:00 0 0 0 11:00 0 0 0 11:00 0 0 0 11:00 0 0 0
11:15 0 0 0 11:15 0 0 0 11:15 1 0 0 11:15 0 0 2
11:30 0 0 0 11:30 0 1 0 11:30 0 0 0 11:30 0 0 0
11:45 0 0 0 11:45 0 0 0 11:45 0 0 0 11:45 0 0 0
12:00 0 0 0 12:00 0 0 0 12:00 0 0 0 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0 12:15 0 0 1 12:15 0 0 1
12:30 0 0 0 12:30 0 0 0 12:30 0 0 0 12:30 0 0 0
12:45 0 0 0 12:45 0 0 0 12:45 0 0 0 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0 13:00 0 0 0 13:00 0 0 0
13:15 0 0 0 13:15 0 0 0 13:15 0 0 0 13:15 0 0 0
13:30 0 0 0 13:30 0 0 0 13:30 0 0 0 13:30 0 1 0
13:45 0 0 0 13:45 0 0 0 13:45 0 0 0 13:45 0 0 1
14:00 0 0 0 14:00 0 0 0 14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0 14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 0 0 0 14:30 2 0 0 14:30 0 0 0
14:45 0 0 0 14:45 0 0 0 14:45 0 0 0 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0 15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0 15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0 15:30 0 0 0 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0 15:45 0 0 0 15:45 0 0 0
16:00 0 0 0 16:00 0 0 0 16:00 0 0 0 16:00 0 0 0
16:15 0 0 0 16:15 0 0 0 16:15 0 0 0 16:15 0 0 0
16:30 0 0 0 16:30 0 0 0 16:30 0 0 0 16:30 0 0 0
16:45 0 0 0 16:45 0 0 0 16:45 0 0 0 16:45 0 0 0
17:00 0 0 0 17:00 0 0 0 17:00 0 0 0 17:00 0 0 1
17:15 0 0 0 17:15 0 1 0 17:15 1 0 0 17:15 0 1 0
17:30 0 0 0 17:30 0 0 0 17:30 0 0 0 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0 17:45 0 0 0 17:45 0 0 0
Total: 0 0 0 Total: 0 2 0 Total: 5 0 1 Total: 0 2 7
North Leg - Yosemite Pl East Leg - John Muir Pkwy South Leg - Tsushima St West Leg - John Muir Pkwy
Date: 01/09/2025
Location: Tioga Loop_John Muir Pkwy
Site Code: 01
Time: 7AM- 6PM
Time Left Thru Right Time Left Thru Right Time Left Thru Right Time Left Thru Right 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0 7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0 7:30 0 0 0 7:30 0 1 0
7:45 0 0 0 7:45 0 0 0 7:45 0 0 0 7:45 0 0 0
8:00 0 0 0 8:00 0 0 0 8:00 0 0 0 8:00 0 0 0
8:15 0 0 0 8:15 0 0 0 8:15 0 0 0 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0 8:30 0 0 0 8:30 0 1 0
8:45 0 0 0 8:45 0 0 0 8:45 0 0 0 8:45 0 0 0
9:00 0 0 0 9:00 0 0 0 9:00 0 0 0 9:00 0 0 0
9:15 0 0 0 9:15 0 0 0 9:15 0 0 0 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0 9:30 0 0 0 9:30 0 0 0
9:45 0 0 1 9:45 0 0 0 9:45 0 0 0 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0 10:00 0 0 0 10:00 0 0 0
10:15 0 0 0 10:15 0 0 0 10:15 0 0 0 10:15 0 0 0
10:30 0 0 0 10:30 0 0 0 10:30 0 0 0 10:30 0 0 0
10:45 0 0 0 10:45 0 0 0 10:45 0 0 0 10:45 0 0 0
11:00 0 0 0 11:00 0 1 0 11:00 0 0 0 11:00 0 0 0
11:15 0 0 0 11:15 0 0 0 11:15 0 0 0 11:15 0 0 0
11:30 0 0 0 11:30 0 0 0 11:30 0 0 0 11:30 0 0 1
11:45 0 0 0 11:45 0 0 0 11:45 0 0 0 11:45 0 0 0
12:00 0 0 0 12:00 0 1 0 12:00 0 0 0 12:00 0 1 0
12:15 0 0 0 12:15 0 0 0 12:15 0 0 0 12:15 0 0 1
12:30 0 0 0 12:30 0 0 0 12:30 0 0 0 12:30 0 0 0
12:45 0 0 0 12:45 0 0 0 12:45 0 0 0 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0 13:00 0 0 0 13:00 0 0 0
13:15 0 0 0 13:15 0 0 1 13:15 0 0 0 13:15 0 0 1
13:30 0 0 0 13:30 0 0 0 13:30 0 0 0 13:30 0 0 2
13:45 0 0 0 13:45 0 0 0 13:45 0 0 0 13:45 0 0 2
14:00 0 0 1 14:00 0 0 0 14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0 14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 0 0 0 14:30 0 0 0 14:30 0 0 0
14:45 0 0 0 14:45 0 0 0 14:45 0 0 0 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0 15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0 15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0 15:30 0 0 0 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0 15:45 0 0 0 15:45 0 0 2
16:00 0 0 0 16:00 0 0 0 16:00 0 0 0 16:00 0 0 0
16:15 0 0 0 16:15 0 0 0 16:15 0 0 0 16:15 0 0 0
16:30 0 0 0 16:30 0 0 0 16:30 0 0 0 16:30 0 0 0
16:45 0 0 0 16:45 0 0 0 16:45 0 0 0 16:45 0 0 0
17:00 0 0 0 17:00 0 0 0 17:00 0 0 0 17:00 0 0 0
17:15 0 0 0 17:15 0 0 0 17:15 0 0 0 17:15 0 0 0
17:30 0 0 0 17:30 0 0 0 17:30 0 0 0 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0 17:45 0 0 0 17:45 0 0 0
Total: 0 0 2 Total: 0 2 1 Total: 0 0 0 Total: 0 3 9
North Leg - Tioga Loop East Leg - John Muir Pkwy South Leg - N/A West Leg - John Muir Pkwy
Date: 01/09/2025
Location: Yosemite Pl/Tsushima St_John Muir Pkwy
Site Code: 02
Time: 7AM- 6PM
Time NB SB Total Total Time NB SB Total Total Time NB SB Total Total Time NB SB Total Total 7:00 0 1 1 7:00 0 1 1 7:00 0 0 0 7:00 0 0 0
7:15 1 0 1 7:15 0 0 0 7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0 7:30 0 0 0 7:30 0 0 0
7:45 1 0 1 7:45 0 0 0 7:45 0 0 0 7:45 0 0 0
8:00 1 0 1 8:00 0 0 0 8:00 0 0 0 8:00 0 0 0
8:15 0 0 0 8:15 0 0 0 8:15 0 1 1 8:15 0 0 0
8:30 0 0 0 8:30 0 0 0 8:30 1 0 1 8:30 0 0 0
8:45 0 0 0 8:45 0 0 0 8:45 0 0 0 8:45 0 0 0
9:00 0 1 1 9:00 0 0 0 9:00 0 0 0 9:00 0 0 0
9:15 0 0 0 9:15 0 0 0 9:15 0 0 0 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0 9:30 0 0 0 9:30 0 0 0
9:45 0 0 0 9:45 0 0 0 9:45 1 0 1 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0 10:00 0 1 1 10:00 0 0 0
10:15 0 1 1 10:15 0 0 0 10:15 1 1 2 10:15 0 0 0
10:30 0 0 0 10:30 0 0 0 10:30 0 0 0 10:30 0 0 0
10:45 1 0 1 10:45 0 0 0 10:45 0 0 0 10:45 0 0 0
11:00 0 0 0 11:00 0 0 0 11:00 0 0 0 11:00 0 0 0
11:15 0 0 0 11:15 0 0 0 11:15 1 0 1 11:15 0 0 0
11:30 1 0 1 11:30 0 0 0 11:30 0 0 0 11:30 0 0 0
11:45 1 0 1 11:45 0 0 0 11:45 1 0 1 11:45 0 0 0
12:00 0 0 0 12:00 0 0 0 12:00 0 0 0 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0 12:15 0 2 2 12:15 0 0 0
12:30 2 0 2 12:30 0 0 0 12:30 0 0 0 12:30 0 0 0
12:45 0 2 2 12:45 0 0 0 12:45 1 1 2 12:45 0 0 0
13:00 0 0 0 13:00 0 0 0 13:00 0 1 1 13:00 0 0 0
13:15 0 1 1 13:15 2 0 2 13:15 0 0 0 13:15 0 0 0
13:30 2 0 2 13:30 0 0 0 13:30 0 0 0 13:30 0 0 0
13:45 1 0 1 13:45 0 0 0 13:45 0 0 0 13:45 0 0 0
14:00 0 0 0 14:00 0 0 0 14:00 1 0 1 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0 14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 0 0 0 14:30 0 0 0 14:30 0 0 0
14:45 0 0 0 14:45 0 0 0 14:45 3 0 3 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0 15:00 0 3 3 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0 15:15 0 1 1 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0 15:30 0 0 0 15:30 0 0 0
15:45 0 1 1 15:45 0 0 0 15:45 0 0 0 15:45 0 0 0
16:00 1 0 1 16:00 0 0 0 16:00 0 0 0 16:00 0 0 0
16:15 0 0 0 16:15 0 0 0 16:15 0 2 2 16:15 0 0 0
16:30 1 0 1 16:30 0 0 0 16:30 1 0 1 16:30 0 2 2
16:45 0 0 0 16:45 0 0 0 16:45 0 0 0 16:45 1 0 1
17:00 0 1 1 17:00 0 0 0 17:00 0 0 0 17:00 0 0 0
17:15 1 0 1 17:15 1 0 1 17:15 1 0 1 17:15 0 0 0
17:30 0 0 0 17:30 0 0 0 17:30 0 0 0 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0 17:45 0 0 0 17:45 0 0 0
Total: 14 8 Total: 3 1 Total: 12 13 Total: 1 2
0 3
0 0
0 0
0 0
0 0
3 West Leg - John Muir Pkwy
0 22 4 25
East Leg - John Muir Pkwy East Leg - John Muir Pkwy West Leg - John Muir Pkwy 3 1 0
1 0 1
1 0 2
2 0 2
2 0 3
4 4 2 1
4 0 4
4 Pedestrians Bikes on Crosswalk Pedestrians Bikes on Crosswalk 2 1 1
2 0 3
1 0 4
0 0
8 7
4 5
8 4
3 2
5 4
Date: 01/09/2025
Location: Yosemite Pl/Tsushima St_John Muir Pkwy
Site Code: 02
Time: 7AM- 6PM
Time Left Thru Right Time Left Thru Right Time Left Thru Right Time Left Thru Right 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0 7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0 7:30 0 0 0 7:30 0 1 0
7:45 0 0 0 7:45 0 0 0 7:45 0 0 0 7:45 0 0 0
8:00 0 0 0 8:00 0 0 0 8:00 0 0 0 8:00 0 0 0
8:15 0 0 0 8:15 0 0 0 8:15 0 0 0 8:15 0 0 0
8:30 0 0 0 8:30 0 1 0 8:30 0 0 0 8:30 0 1 0
8:45 0 0 0 8:45 0 0 0 8:45 0 0 0 8:45 0 0 0
9:00 0 0 0 9:00 0 0 0 9:00 0 0 0 9:00 0 0 0
9:15 0 0 0 9:15 0 0 0 9:15 0 0 0 9:15 0 0 0
9:30 0 0 0 9:30 0 0 0 9:30 0 0 0 9:30 0 0 0
9:45 0 0 0 9:45 0 0 0 9:45 0 0 0 9:45 0 0 0
10:00 0 0 0 10:00 0 0 0 10:00 0 0 0 10:00 0 0 0
10:15 0 0 0 10:15 0 0 0 10:15 0 0 0 10:15 0 0 0
10:30 0 0 0 10:30 0 0 0 10:30 0 0 0 10:30 0 0 0
10:45 0 0 0 10:45 0 0 0 10:45 0 0 0 10:45 0 0 1
11:00 0 0 0 11:00 0 0 0 11:00 1 0 0 11:00 0 0 0
11:15 0 0 0 11:15 0 0 0 11:15 0 0 0 11:15 0 0 0
11:30 0 0 0 11:30 0 0 0 11:30 0 0 0 11:30 0 0 1
11:45 0 0 0 11:45 0 0 0 11:45 0 0 0 11:45 0 0 0
12:00 0 0 0 12:00 0 1 0 12:00 0 0 1 12:00 0 0 0
12:15 0 0 0 12:15 0 0 0 12:15 0 0 0 12:15 0 1 0
12:30 0 0 0 12:30 0 0 0 12:30 0 0 0 12:30 0 0 0
12:45 0 0 0 12:45 0 0 0 12:45 0 0 0 12:45 0 0 0
13:00 0 0 0 13:00 0 1 0 13:00 0 0 0 13:00 0 0 0
13:15 0 0 0 13:15 0 0 0 13:15 1 0 0 13:15 0 0 1
13:30 0 0 0 13:30 0 0 0 13:30 0 0 0 13:30 0 2 0
13:45 0 0 0 13:45 0 0 0 13:45 0 0 0 13:45 0 3 0
14:00 0 0 0 14:00 0 0 0 14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0 14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 0 0 0 14:30 0 0 0 14:30 0 0 0
14:45 0 0 0 14:45 0 0 0 14:45 0 0 0 14:45 0 0 0
15:00 0 0 0 15:00 0 0 0 15:00 0 0 0 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0 15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 0 0 0 15:30 2 0 0 15:30 0 0 0
15:45 0 0 0 15:45 0 0 0 15:45 0 0 0 15:45 0 1 0
16:00 0 1 0 16:00 0 0 0 16:00 0 0 0 16:00 0 0 0
16:15 0 0 0 16:15 1 0 0 16:15 0 0 0 16:15 0 0 0
16:30 0 0 0 16:30 0 0 0 16:30 0 0 0 16:30 0 0 1
16:45 0 0 0 16:45 0 0 0 16:45 0 0 0 16:45 0 0 0
17:00 0 0 0 17:00 0 0 0 17:00 0 0 0 17:00 0 0 0
17:15 0 0 0 17:15 0 0 0 17:15 0 0 0 17:15 0 0 0
17:30 0 0 0 17:30 0 0 0 17:30 0 0 0 17:30 0 0 0
17:45 0 0 0 17:45 0 0 0 17:45 0 0 0 17:45 0 0 0
Total: 0 1 0 Total: 1 3 0 Total: 4 0 1 Total: 0 9 4
North Leg - Yosemite Pl East Leg - John Muir Pkwy South Leg - Tsushima St West Leg - John Muir Pkwy
Multiway Stop Warrant Analysis
Major Street Approach
(John Muir Parkway
Street)
Vehicles Vehicles Bikes Peds Total
12:00 AM 15 0 - - 0
1:00 AM 5 0 - - 0
2:00 AM 5 0 - - 0
3:00 AM 7 0 - - 0
4:00 AM 24 1 - - 1
5:00 AM 43 7 - - 7
6:00 AM 80 7 - - 7
7:00 AM 174 22 2 - 24
8:00 AM 158 24 2 - 26
9:00 AM 140 12 1 1 14
10:00 AM 114 17 0 - 17
11:00 AM 149 8 4 - 12
12:00 PM 171 14 4 - 18
1:00 PM 163 18 11 - 29
2:00 PM 147 12 1 1 14
3:00 PM 192 17 4 - 21
4:00 PM 228 16 0 - 16
5:00 PM 209 11 12 - 23
6:00 PM 172 9 - - 9
7:00 PM 149 11 - - 11
8:00 PM 123 7 - - 7
9:00 PM 94 4 - - 4
10:00 PM 63 0 - - 0
11:00 PM 34 2 - - 2
Highest 8 Hours
Average 183
Threshold 300
Threshold Met No
200
No
21 Hours
Minor Street Approach
(Tioga LoopStreet)
Hourly Volumes (veh/hr)
Thursday
2/6/2025
Multiway Stop Warrant Analysis
Major Street Approach
(John Muir Parkway
Street)
Vehicles Vehicles Bikes Peds Total
12:00 AM 39 1 - - 1
1:00 AM 17 1 - - 1
2:00 AM 17 2 - - 2
3:00 AM 9 0 - - 0
4:00 AM 14 2 - - 2
5:00 AM 16 1 - - 1
6:00 AM 32 5 - - 5
7:00 AM 54 9 0 - 9
8:00 AM 102 5 2 - 7
9:00 AM 144 15 6 - 21
10:00 AM 170 12 4 - 16
11:00 AM 186 14 5 - 19
12:00 PM 180 23 3 1 27
1:00 PM 217 13 3 1 17
2:00 PM 199 16 4 3 23
3:00 PM 201 20 1 0 21
4:00 PM 184 13 7 0 20
5:00 PM 219 15 4 0 19
6:00 PM 158 14 - - 14
7:00 PM 118 6 - - 6
8:00 PM 111 6 - - 6
9:00 PM 101 15 - - 15
10:00 PM 84 4 - - 4
11:00 PM 43 4 - - 4
Highest 8 Hours
Average 193
Threshold 300
Threshold Met No
200
No
20 Hours
Minor Street Approach
(Tioga LoopStreet)
Hourly Volumes (veh/hr)
Saturday
2/6/2025
Multiway Stop Warrant Analysis
Major Street Approach
(John Muir Parkway)
Vehicles Vehicles Bikes Peds Total
12:00 AM 24 0 - - 0
1:00 AM 10 1 - - 1
2:00 AM 10 5 - - 5
3:00 AM 4 6 - - 6
4:00 AM 18 11 - - 11
5:00 AM 60 40 - - 40
6:00 AM 83 51 - - 51
7:00 AM 197 110 0 4 114
8:00 AM 242 105 0 3 108
9:00 AM 160 79 0 2 81
10:00 AM 145 69 0 5 74
11:00 AM 169 48 1 4 53
12:00 PM 223 61 1 8 70
1:00 PM 193 46 1 7 54
2:00 PM 220 66 0 4 70
3:00 PM 278 63 2 5 70
4:00 PM 292 72 1 8 81
5:00 PM 297 70 0 4 74
6:00 PM 229 58 - - 58
7:00 PM 218 43 - - 43
8:00 PM 120 25 - - 25
9:00 PM 101 22 - - 22
10:00 PM 73 16 - - 16
11:00 PM 36 6 - - 6
Highest 8 Hours
Average 250
Threshold 300
Threshold Met No
200
No
72 Hours
Thursday
Minor Street Approach
(Yosemite-Tsushima)
Hourly Volumes (veh/hr)
2/6/2025
Multiway Stop Warrant Analysis
Major Street Approach
(John Muir Parkway)
Vehicles Vehicles Bikes Peds Total
12:00 AM 49 3 - - 3
1:00 AM 27 3 - - 3
2:00 AM 15 3 - - 3
3:00 AM 10 8 - - 8
4:00 AM 11 4 - - 4
5:00 AM 18 12 - - 12
6:00 AM 32 27 - - 27
7:00 AM 61 27 1 0 28
8:00 AM 128 49 3 0 52
9:00 AM 169 66 5 0 71
10:00 AM 181 64 7 1 72
11:00 AM 247 84 9 1 94
12:00 PM 252 81 5 1 87
1:00 PM 268 68 5 0 73
2:00 PM 237 59 5 2 66
3:00 PM 254 73 2 0 75
4:00 PM 219 71 9 0 80
5:00 PM 256 67 7 1 75
6:00 PM 209 56 - - 56
7:00 PM 158 33 - - 33
8:00 PM 157 27 - - 27
9:00 PM 115 26 - - 26
10:00 PM 86 22 - - 22
11:00 PM 67 17 - - 17
Highest 8 Hours
Average 243
Threshold 300
Threshold Met No
Minor Street Approach
(Yosemite-Tsushima)
Hourly Volumes (veh/hr)
200
No
76 Hours
Saturday
2/6/2025
TIOGA LOOP
JOHN MUIR PARKWAY
LEGEND
N1"=100'ATTACHMENT D.1FIELD OBSERVED INTERSECTION SIGHT DISTANCE ANALYSISHERCULES AWSC WARRANTJOHN MUIR PARKWAY AND TIOGA LOOP (SOUTHBOUND)FEBRUARY 2025097014007 SIGHT DISTANCE REQUIREMENTSDESIGNSPEED(MPH)SETBACK(FT)CATEGORYINTERSECTION SIGHT DISTANCE (ISD)LEFT TURN (B1 & B2)RIGHT TURN (B2)LOOKINGRIGHT FROMDECISION POINTLOOKINGLEFT FROMDECISION POINTLOOKINGLEFT FROMDECISION POINTREQUIRED (FT)390335335 8' FROMTRAVELWAYAVAILABLE (FT)620815815 ACCEPTABLE?YYY
YOSEMITE PL
TSUSHIMA ST
JOHN MUIR PKWY
LEGEND
N1"=100'ATTACHMENT D.2FIELD OBSERVED INTERSECTION SIGHT DISTANCE ANALYSISHERCULES AWSC WARRANT JOHN MUIR PARKWAY AND YOSEMITE PL-TSUSHIMA STREET (SOUTHBOUND)FEBRUARY 2025097014007 SIGHT DISTANCE REQUIREMENTSDESIGNSPEED(MPH)SETBACK(FT)CATEGORYINTERSECTION SIGHT DISTANCE (ISD)LEFT TURN (B1 & B2)RIGHT TURN (B2)LOOKINGRIGHT FROMDECISION POINTLOOKINGLEFT FROMDECISION POINTLOOKINGLEFT FROMDECISION POINTREQUIRED (FT)390335335 8' FROMTRAVELWAYAVAILABLE (FT)425255255 ACCEPTABLE?YNN
YOSEMITE PL
TSUSHIMA ST
JOHN MUIR PKWY
LEGEND
N1"=100'ATTACHMENT D.3FIELD OBSERVED INTERSECTION SIGHT DISTANCE ANALYSISHERCULES AWSC WARRANT JOHN MUIR PARKWAY AND YOSEMITE PL-TSUSHIMA STREET (NORTHBOUND)FEBRUARY 2025097014007 SIGHT DISTANCE REQUIREMENTSDESIGNSPEED(MPH)SETBACK(FT)CATEGORYINTERSECTION SIGHT DISTANCE (ISD)LEFT TURN (B1 & B2)RIGHT TURN (B2)LOOKINGRIGHT FROMDECISION POINTLOOKINGLEFT FROMDECISION POINTLOOKINGLEFT FROMDECISION POINTREQUIRED (FT)390335335 8' FROMTRAVELWAYAVAILABLE (FT)460415415 ACCEPTABLE?YYY