Cities Index.
Presentation

Hercules City Council
July 28, 2026

Document
Presentation
Meeting
July 28, 2026
Body
Hercules City Council
Original file
5.1 MB
Text extracted from the city's file for reading and search. Open the original on hercules.legistar1.com. That file is the official record.

I-80 Westbound
Carquinez
(Al Zampa)
Bridge Deck
Rehabilitation
Solano/Contra Costa
Counties, Project 04-1Y700
Weekend Closure:

August 21 – 24, 2026

Project Location
This project is in Contra Costa
County and Solano County on
Westbound (WB) Interstate – 80.

Between East end of the
Carquinez Bridge (Al Zampa
Memorial) in Vallejo to the WB
Off-Ramp to Pomona Street in
Crockett.

Project Need
The Asphalt Concrete is
showing signs of aging and
deteriorating. Which results in
poor ride quality. To prevent
further wear and tear a repave
of the deck needs to be
completed.

Project Purpose
The purpose of the project is to
improve the rideability of the
deck surface, prolong the deck
service life, preserve the
structural integrity of the bridge,
and enhance safety for the
traveling public.

Project
Scope
• The top layer (1”) of the Asphalt Concrete will be replaced to improve rideability and preserve the structural integrity. • Bridge Deck Length: 3500 ft | Deck Width: 67 ft | 4 Lanes | • Anticipated Hot Mix Asphalt Tonnage: 1550 tons

Scheduled Closure
We will close I-80 for one weekend for the
worker safety and safety to the travelling
public and due to long curing times for full
concrete pavement replacement.

Westbound (53-hour weekend)
 August 21, Friday (10:00pm) through
August 24, Monday (3:00am)

Need for Full Closure
Due to weather and temperature restrictions
• It is recommended that the work needs to be completed in August or September
• Paving works needs to be conducted in the Daytime from 10 AM to 5 PM
• Recommend work be down via a full weekend closure on
Westbound I-80 from Friday 10:00 PM to Monday 3:00
AM.

Benefits of a Full Weekend Closure of the Bridge
• For the safety of public and workers.
• Helps facility the need for overlap in waterproofing repair • Micro-milling and equipment cleaning before each pass • Meaning the paver can be cleaned at the end of
each pass to maintain material temperature
consistency
• Daytime weather is required for paving work due to its significant effect on the cooling of the custom thin
asphalt layer

Traffic
Management
Plan
• Regional Changeable Message Sign
(CMS) Deployment
• Detours
• Outreach Effort

Vallejo On-Ramp
Closures
Westbound (53-hour weekend)
August 21, Friday (10:00pm) through
August 24, Monday (3:00am)
Local
Detours
10 Westbound (53-hour
weekend)
August 21, Friday (10:00pm)
through August 24, Monday
(3:00am)
Regional
Detour
Westbound (53-hour weekend)
August 21, Friday (10:00pm) through
August 24, Monday (3:00am)
Regional CMS
Deployment
Portable Changeable Message Signs
(PCMS) and Changeable Message Signs
(CMS) will be activated 2 weeks prior and
during closure.

Outreach
Effort
Caltrans will notify public via:
• City Council Meetings
• Radio/TV Station News
• Paid Media Advertisements
• Caltrans Website
• Social Media (Instagram, X,
and Facebook)
• Press Release/Traffic
Advisories

Outreach Effort:

Webpage and
Project Hotline
Hotline Number:
(510) 286-0319
Webpage:

Caltrans Current Project under Solano
Carquinez Bridge | Caltrans

Caltrans External Affairs Contacts
Gene Calderon
Legislative Liaison – Solano
[email protected]
Erik B. Aguilar
Legislative Liaison – Contra Costa
[email protected]
Public Information
Bart Ney
Public Affairs Office Chief
[email protected]
(510) 715-7212
DeNise Harding
Public Information Officer – Contra Costa
[email protected]
(279) 234-2175
Sabrina Martinez
Public Information Officer -Solano
[email protected]
(510) 934-5257
Legislative Affairs Liaison

Questions & Comments

← All documents from this meeting