Text extracted from the city's file for reading and search. Open the original on pub-hermosabeach.escribemeetings.com. That file is the official record.

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 2
G. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Architect. Authorized additional excavation and replacement material will be paid for according to Contract provisions changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Architect. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.

H. Fill: Soil materials used to raise existing grades.

I. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

J. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below base, drainage fill, or topsoil materials.

K. Unclassified Excavation: Removal and disposal of materials encountered regardless of nature of materials, including rock.

L. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

1.5 PROJECT CONDITIONS
A. Existing Utilities: Do not interrupt utilities serving facilities occupied by City or others unless permitted in writing by Architect and then only after arranging to provide temporary utility services according to requirements indicated.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Sand, gravel, friable earth, or non-expansive clays, subject to Testing Laboratory’s approval. Fill and backfill material shall be free of organic material, slag, cinders, expansive soils, trash or rubble and stones having maximum dimension greater than 6 inches.

C. Unsatisfactory Soils: Expansive and other soils as defined in the project’s geotechnical investigation report.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

TS-54

Page 171 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 3
D. Base Course: Material conforming to SSPWC section 200-2.2, Crushed Aggregate Base or SSPWC section 200-2.4 Crushed Miscellaneous Base.

E. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch sieve and not more than 12 percent passing a No. 200 sieve.

F. Bedding Course: Naturally or artificially graded clean, crushed sand; ASTM D 2940; except with 100 percent passing a 3/8-inch sieve and not more than 8 percent passing a No. 200 sieve.

G. Drainage Course: Narrowly graded mixture of washed, crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch sieve and 0 to 5 percent passing a No. 8 sieve.

2.2 ACCESSORIES
A. Warning Tape: Acid- and alkali-resistant polyethylene film warning tape manufactured for marking and identifying underground utilities, 6 inches wide and 4 mils thick, continuously inscribed with a description of the utility. Color coding shall be according to the American Public Works Association (APWA) standards:

1. Blue – Potable water and fire suppression lines.

2. Green – Sanitary sewer and storm drain lines

3. Orange – Communication, alarm or signal lines

4. Purple – Reclaimed water, irrigation, and slurry lines

5. Red – Electrical power lines, cables, conduit and lighting lines

6. Yellow – Gas, oil, steam, petroleum, or gaseous material lines.

PART 3 - EXECUTION

3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.

B. Preparation of subgrade for earthwork operations including removal of vegetation, topsoil, debris, obstructions, and deleterious materials from ground surface is specified in Division 2 Section "Site Clearing" or “Demolition”.

C. Protect and maintain erosion and sedimentation controls, which are specified in Division 2 Section "Site Clearing" or “Demolition,” during earthwork operations.

3.2 EXCAVATION
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil TS-55

Page 172 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 4
materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

3.3 EXCAVATION FOR STRUCTURES
A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch. If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

1. Excavations for Footings and Foundations: Do not disturb bottom of excavation.

Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

3.4 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.

3.5 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.

B. Excavate trenches to uniform widths to provide 6 inch clearance on each side of pipe or conduit.

Excavate trench walls vertically from trench bottom to 12 inches higher than top of pipe or conduit, unless otherwise indicated.

C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove projecting stones and sharp objects along trench subgrade.

1. Excavate trenches 6 inches deeper than elevation required in rock or other unyielding bearing material, 4 inches deeper elsewhere, to allow for bedding course.

3.6 SUBGRADE INSPECTION
A. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by City, without additional compensation.

3.7 UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean TS-56

Page 173 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 5
concrete fill, with 28-day compressive strength of 2500 psi, may be used when approved by Architect.

1. Fill unauthorized excavations under other construction or utility pipe as directed by Architect.

3.8 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.

Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

3.9 UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.

B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

C. Backfill trenches excavated under footings and within 18 inches of bottom of footings with satisfactory soil; fill with concrete to elevation of bottom of footings. Concrete is specified in Division 3 Section Cast-in-Place Concrete.

D. Provide blanket protection for all utility pipes and conduits under driveways, roadways, parking lots, and other vehicular path of travel per APWA Standard Plan 225-1 where the minimum cover over the pipes and conduits is less than 36”.

E. Place and compact initial backfill of satisfactory soil, free of particles larger than 1 inch in any dimension, to a height of 12 inches over the utility pipe or conduit.

1. Carefully compact initial backfill under pipe haunches and compact evenly up on both sides and along the full length of utility piping or conduit to avoid damage or displacement of piping or conduit. Coordinate backfilling with utilities testing.

F. Place and compact final backfill of satisfactory soil to final subgrade elevation.

G. Install warning tape directly above utilities, minimum 6 inches above top of pipe, minimum 12 inches below finished grade, except 6 inches below subgrade under pavements and slabs.

3.10 SOIL FILL
A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

B. Place and compact fill material in layers to required elevations as follows:

TS-57

Page 174 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 6

1. Under grass and planted areas, use satisfactory soil material.

2. Under walks and pavements, use engineered fill.

3. Under steps and ramps, use engineered fill.

4. Under building slabs, use engineered fill.

5. Under footings and foundations, use engineered fill.

3.11 SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

2. Remove and replace, or scarify and air dry otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

3.12 COMPACTION OF SOIL BACKFILLS AND FILLS
A. Place backfill and fill soil materials in layers not more than 8 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D 1557:

1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches of existing subgrade and each layer of backfill or fill soil material to 95 percent.

2. Under walkways, scarify and recompact top 12 inches below subgrade and compact each layer of backfill or fill soil material to 90 percent.

3. Under lawn or unpaved areas, scarify and recompact top 6 inches below subgrade and compact each layer of backfill or fill soil material to 85 percent.

4. For utility trenches, compact each layer of initial and final backfill soil material to 85 percent.

3.13 GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances:

1. Lawn or Unpaved Areas: Plus or minus 1 inch.

TS-58

Page 175 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 7

2. Walks: Plus or minus 1 inch.

3. Pavements: Plus or minus 1/2 inch.

C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10-foot straightedge.

3.14 BASE COURSES
A. Place base course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place base course under pavements and walks as follows:

1. Shape base course to required crown elevations and cross-slope grades.

2. Compact base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 1557.

3.15 DRAINAGE COURSE
A. Place drainage course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place and compact drainage course under cast-in-place concrete slabson-grade as follows:

1. Place drainage course that exceeds 6 inches in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches thick or less than 3 inches thick.

2. Compact each layer of drainage course to required cross sections and thicknesses to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

3.16 FIELD QUALITY CONTROL
A. Testing Agency: City will engage a qualified independent geotechnical engineering testing agency to perform field quality-control testing.

B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earthwork only after test results for previously completed work comply with requirements.

C. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Architect.

D. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167, ASTM D 2922, and ASTM D 2937, as applicable.

E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and retest until specified compaction is obtained.

TS-59

Page 176 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 EARTH MOVING 312000 - 8

3.17 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.18 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off City's property.

END OF SECTION 312000
TS-60

Page 177 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 ASPHALT PAVING 321216 - 1
SECTION 321216 - HOT-MIX ASPHALT PAVING
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes hot-mix asphalt paving.

1.2 SUBMITTALS
A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.

B. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.

C. Material certificates.

D. Log of placement of asphalt, including dates, times, temperature readings and other pertinent information.

1.3 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer shall be registered with and approved by authorities having jurisdiction or the DOT of the state in which Project is located.

B. Standard Specifications: Comply with the Standard Specifications for Public Works Construction (SSPWC) and the California Department of Transportation (Caltrans), latest editions and supplements for asphalt paving work. These Specifications apply only to performance and materials and how they are to be incorporated into the Work. The legal/contractual relationship sections and the measurement and payment sections do not apply to this document.

C. Asphalt-Paving Publication: Comply with AI MS-22, "Construction of Hot Mix Asphalt Pavements," unless more stringent requirements are indicated.

1.4 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp or if the following conditions are not met:

1. Tack Coat: Minimum surface temperature of 60 deg F.

2. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement.

3. Asphalt Surface Course: Minimum surface temperature of 60 deg F at time of placement.

TS-61

Page 178 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 ASPHALT PAVING 321216 - 2
B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials, 50 deg F for water-based materials, and not exceeding 95 deg F.

PART 2 - PRODUCTS

2.1 AGGREGATES
A. Coarse Aggregate: Crushed rock conforming to SSPWC 400-4.2.3.

B. Fine Aggregate: Sand, rock dust, mineral filler, or a blend of these materials conforming to SSPWC 400-4.2.4. Mineral filler, if required, shall conform to SSPWC section 203-6.2.3.

2.2 ASPHALT MATERIALS
A. Asphalt Binder: Paving asphalt, viscosity grade PG 64-10 conforming to Section 92 of the Caltrans Standard Specifications.

B. Tack Coat: PG 64-10 conforming to Section 92 of the Caltrans Standard Specifications.

C. Mixes: Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mix III-C3 PG 64-10 designed in conformance with SSPWC Section 400-4.

2.3 AUXILIARY MATERIALS
A. Herbicide: Commercial chemical for weed control, registered by the EPA. Provide in granular, liquid, or wettable powder form.

B. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with Caltrans Standard Specifications - Section 84 (Federal Specification No. TT-P1952 for Blue, Red and Green paint; and State of California Standard Specification No. PTWB01 for White, Yellow and Black paint) with drying time of less than 45 minutes.

1. Color: White
C. Wheel Stops: Precast, air-entrained concrete

1. Dowels: Galvanized steel, 3/4-inch diameter, 24-inch minimum length.

TS-62

Page 179 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 ASPHALT PAVING 321216 - 3
PART 3 - EXECUTION

3.1 COLD MILLING
A. Clean existing pavement surface of loose and deleterious material immediately before cold milling. Remove existing asphalt pavement by cold milling to grades and cross sections indicated.

1. Mill to a depth of 3 inches

3.2 PATCHING
A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement section to sound base. Excavate rectangular or trapezoidal patches, extending 12 inches into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Remove excavated material. Recompact existing unbound-aggregate base course to form new subgrade.

B. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd.

C. Patching: Fill excavated pavements with hot-mix asphalt base mix and, while still hot, compact flush with adjacent surface.

3.3 SURFACE PREPARATION
A. Proof-roll subbase using heavy, pneumatic-tired rollers to locate areas that are unstable or that require further compaction.

B. Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.

1. Sweep loose granular particles from surface of unbound-aggregate base course. Do not dislodge or disturb aggregate embedded in compacted surface of base course.

C. Herbicide Treatment: Apply herbicide according to manufacturer's recommended rates and written application instructions. Apply to dry, prepared subgrade or surface of compactedaggregate base before applying paving materials.

D. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq. yd.

1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.

Remove spillages and clean affected surfaces.

TS-63

Page 180 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 ASPHALT PAVING 321216 - 4

3.4 HOT-MIX ASPHALT PLACING
A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.

1. Spread mix at minimum temperature of 250 deg F.

2. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.

B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.

C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.

3.5 COMPACTION
A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or vibratory-plate compactors in areas inaccessible to rollers.

1. Complete compaction before mix temperature cools to 185 deg F.

B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.

C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:

1. Average Density: 92 percent of reference maximum theoretical density according to ASTM D 2041, but not less than 90 percent nor greater than 96 percent.

D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.

E. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.

F. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.

3.6 INSTALLATION TOLERANCES
A. Thickness: Compact each course to produce the thickness indicated within the following tolerances:

TS-64

Page 181 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 ASPHALT PAVING 321216 - 5

1. Base Course: Plus or minus 1/2 inch.

2. Surface Course: Plus 1/4 inch (no minus).

B. Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:

1. Base Course: 1/4 inch

2. Surface Course: 1/8 inch

3. Crowned Surfaces: Test with crowned template centered and at right angle to crown.

Maximum allowable variance from template is 1/4 inch.

3.7 PAVEMENT MARKING
A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Owner.

B. Allow paving to age for 30 days before starting pavement marking.

C. Sweep and clean surface to eliminate loose material and dust.

D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.

3.8 WHEEL STOPS
A. Securely attach wheel stops into pavement with not less than two galvanized steel dowels embedded at one-quarter to one-third points. Securely install dowels into pavement and bond to wheel stop. Recess head of dowel 1 inch beneath top of wheel stop.

3.9 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and to prepare test reports.

B. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

C. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.

3.10 DISPOSAL
A. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of them in an EPA-approved landfill.

END OF SECTION 321216
TS-65

Page 182 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 CONCRETE PAVING 321313 - 1
SECTION 321313 - CONCRETE PAVING
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes exterior cement concrete pavement for the following:

1. Driveways and roadways.

2. Parking lots.

3. Curbs and gutters.

4. Walkways.

1.2 SUBMITTALS
A. Product Data: For each type of product indicated, including admixtures.

B. Design Mixtures: For each concrete pavement mixture.

C. Product Data for Credit MRc4: For products and materials having recycled content, documentation indicating percentages by weight of postconsumer recycled content. Include statement indicating cost for each product having recycled content.

D. Product Data for Credit MRc5: For products and materials qualified as regional materials, documentation indicating location of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating distance to Project, cost for each regional material and fraction by weight is considered regional.

1.3 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer of ready-mixed concrete products who complies with ASTM C 94/C 94M requirements for production facilities and equipment.

B. ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," unless modified by requirements in the Contract Documents.

C. All work to be performed and materials to be used shall be in accordance with the Standard Specifications for Public Works Construction, latest edition and supplements.

D. The Contractor shall have one copy of the Standard Specifications at the job site.

E. The Standard Specifications apply only to performance and materials and how they are to be incorporated into the Work. The legal/contractual relationship sections and the measurement and pavement sections do not apply to this document.

TS-66

Page 183 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 CONCRETE PAVING 321313 - 2
PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT
A. Plain-Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as-drawn steel wire into flat sheets.

B. Reinforcing Bars: ASTM A 615/A 615M, Grade 60; deformed.

C. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars, welded wire reinforcement, and dowels in place. Manufacture bar supports according to CRSI's "Manual of Standard Practice."

2.2 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout the Project:

1. Portland Cement: ASTM C 150, Type II, low alkali. Supplement with the following:
a. Pozzolan: ASTM C618, Class F or N Fly Ash, 100 pounds maximum per cubic yard, containing one percent or less carbon. Fly ash shall not be used in excess of 15 percent by weight of total cement quantity.

B. Combined Aggregates: Gradation “C” conforming to SSPWC Section 201-1.3.2.

C. Water: ASTM C 94/C 94M.

2.3 CURING MATERIALS
A. Liquid Curing Compound: ASTM C309, fugitive dye dissipating type, complying with Rule II 13 of the South Coast Air Quality Management District and Federal Air Quality Regulation 40 CFR 52.254.

B. Moisture-Retaining Cover (Curing Sheet): ASTM C 171, non-staining polyethylene film or white burlap-polyethylene sheet.

C. Water: Potable.

D. Evaporation Retarder: Waterborne, monomolecular film forming; manufactured for application to fresh concrete.

2.4 RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber.

B. Color Pigment: ASTM C 979, synthetic mineral-oxide pigments or colored water-reducing admixtures; color stable, free of carbon black, nonfading, and resistant to lime and other alkalis.

TS-67

Page 184 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 CONCRETE PAVING 321313 - 3
C. Slip-Resistive Aggregate Finish: Factory-graded, packaged, rustproof, nonglazing, abrasive aggregate of fused aluminum-oxide granules or crushed emery with emery aggregate containing not less than 50 percent aluminum oxide and not less than 20 percent ferric oxide; unaffected by freezing, moisture, and cleaning materials.

D. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with Caltrans Standard Specifications - Section 84 (Federal Specification No. TT-P1952 for Blue, Red and Green paint; and State of California Standard Specification No. PTWB01 for White, Yellow and Black paint) with drying time of less than 45 minutes.

2.5 WHEEL STOPS
A. Wheel Stops: Precast, air-entrained concrete

1. Dowels: Galvanized steel, 3/4-inch diameter, 24-inch minimum length.

2.6 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, with the following properties:

1. Compressive Strength (28 Days): 2,500 psi

2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.45

3. Slump Limit: 4 inches, plus or minus 1 inch.

B. Color Pigment: Add color pigment to concrete mixture according to manufacturer's written instructions.

2.7 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Furnish batch certificates to Architect for each batch discharged and used in the Work.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Proof-roll prepared subbase surface below concrete pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding.

3.2 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.

TS-68

Page 185 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 CONCRETE PAVING 321313 - 4
B. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage.

3.3 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

3.4 JOINTS
A. General: Form construction, isolation, and control joints and tool edgings true to line with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline, unless otherwise indicated.

B. Construction Joints: Set construction joints at side and end terminations of pavement and at locations where pavement operations are stopped for more than one-half hour unless pavement terminates at isolation joints.

C. Isolation Joints: Form isolation joints of preformed joint-filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated.

D. Control Joints: Form weakened-plane control joints, sectioning concrete into areas as indicated.

Construct control joints for a depth equal to at least one-fourth of the concrete thickness to match jointing of existing adjacent concrete pavement.

E. Edging: Tool edges of pavement, gutters, curbs, and joints in concrete after initial floating with an edging tool to a 1/4-inch radius. Repeat tooling of edges after applying surface finishes.

Eliminate tool marks on concrete surfaces.

3.5 CONCRETE PLACEMENT
A. Moisten subbase to provide a uniform dampened condition at time concrete is placed.

B. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.

C. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place.

D. Screed pavement surfaces with a straightedge and strike off.

E. Commence initial floating using bull floats or darbies to impart an open textured and uniform surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or spreading surface treatments.

3.6 FLOAT FINISHING
A. General: Do not add water to concrete surfaces during finishing operations.

TS-69

Page 186 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 CONCRETE PAVING 321313 - 5
B. Float Finish: Begin the second floating operation when bleed-water sheen has disappeared and concrete surface has stiffened sufficiently to permit operations. Float surface with power-driven floats, or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high spots and fill low spots. Refloat surface immediately to uniform granular texture.

1. Burlap Finish: Drag a seamless strip of damp burlap across float-finished concrete, perpendicular to line of traffic, to provide a uniform, gritty texture.

C. Slip-Resistive Aggregate Finish: Before final floating, spread slip-resistive aggregate finish on pavement surface according to manufacturer's written instructions.

1. Cure concrete with curing compound recommended by slip-resistive aggregate manufacturer. Apply curing compound immediately after final finishing.

2. After curing, lightly work surface with a steel wire brush or abrasive stone and water to expose nonslip aggregate.

3.7 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

B. Comply with ACI 306.1 for cold-weather protection.

C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturers written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.

E. Curing Methods: Cure concrete by moisture curing, moisture-retaining-cover curing, curing compound or a combination of these methods.

3.8 PAVEMENT TOLERANCES
A. Comply with tolerances as follows

1. Elevation: 1/4 inch

2. Thickness: Plus 3/8 inch minus 1/4 inch

3. Surface: Gap below 10-foot-long, unleveled straightedge not to exceed 1/4 inch.

4. Joint Spacing: 3 inches.

5. Contraction Joint Depth: Plus 1/4 inch no minus.

6. Joint Width: Plus 1/8 inch, no minus.

TS-70

Page 187 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 CONCRETE PAVING 321313 - 6

3.9 PAVEMENT MARKING
A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Architect.

B. Allow concrete pavement to cure for 28 days and be dry before starting pavement marking.

C. Sweep and clean surface to eliminate loose material and dust.

D. Apply paint with mechanical equipment to produce pavement markings of dimensions indicated with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.

3.10 WHEEL STOPS
A. Securely attach wheel stops into pavement with not less than two galvanized steel dowels embedded in holes drilled or cast into wheel stops at one-quarter to one-third points. Firmly bond each dowel to wheel stop and to pavement. Securely install dowels into pavement and bond to wheel stop. Recess head of dowel 1 inch beneath top of wheel stop.

3.11 REPAIRS AND PROTECTION
A. Remove and replace concrete pavement that is broken, damaged, or defective or that does not comply with requirements in this Section.

B. Protect concrete from damage. Exclude traffic from pavement for at least 14 days after placement.

C. Maintain concrete pavement free of stains, discoloration, dirt, and other foreign material.

Sweep concrete pavement not more than two days before date scheduled for Substantial Completion inspections.

END OF SECTION 321313
TS-71

Page 188 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-1
SECTION 321413.19 – PERMEABLE INTERLOCKING CONCRETE PAVEMENT PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Work consists of furnishing and installing a Permeable Interlocking Concrete Pavement (PICP) System in accordance with these specifications and in general conformance with the lines, grades, design, and dimensions shown on the plans.

2. Installation work includes:
a. Verifying subgrade elevations and slope generally conform to the lines, grades, infiltration rate, density, and site conditions depicted in the construction documents;
b. Furnishing and installing geotextile and/or geomembrane liner (where required), horizontal drainage piping (where required), subbase course, base course, bedding course, edge restraint, concrete pavers and permeable joint material in general conformance to the lines and grades shown on the construction documents.

B. Related Requirements:

1. Section 31 20 00 Earth Moving

2. Section 31 05 19.13 Geotextiles for Earthwork

3. Section 31 05 19.16 Geomembranes for Earthwork

4. Section 32 11 23 Aggregate Base Courses

5. Section 32 16 13 Curbs and Gutters

6. Section 32 17 00 Paving Specialties (Parking Bumpers, Pavement Markings, Snow Melt Systems, Tactile Warnings)

7. Section 33 41 16.19 Pipe Underdrains

1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):

1. ASTM C33 Standard Specification for Concrete Aggregates

2. ASTM C94 Standard Specification for Ready-Mixed Concrete

3. ASTM C131 Standard Test Method for Resistance to Degradation of Small-Sized Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

4. ASTM C136 Standard Test Method for Sieve Analysis of Fine and Coarse-Grained Aggregates

5. ASTM C140 Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related Units

6. ASTM C936 Standard Specification for Solid Concrete Interlocking Paving Units

7. ASTM C979 Standard Specification for Pigments for Integrally Colored Concrete

8. ASTM C1645 Standard Test Method for Freeze-thaw and De-icing Salt Durability of Solid Interlocking Paving Units
TS-72

Page 189 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-2

9. ASTM C1781 Standard Test Method for Surface Infiltration Rate of Permeable Unit Pavement Systems

10. ASTM D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort

11. ASTM D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort

12. ASTM D3034 Standard Specification for Type PSM Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings

13. ASTM D3350 Standard Specification for Polyethylene Plastic Pipe and Fittings Materials

14. ASTM D4873 Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples

15. ASTM E2835 Standard Test Method for Measuring Deflections using a Portable Impulse Plate Load Test Device
B. Interlocking Concrete Pavement Institute (ICPI)

1. Permeable Interlocking Concrete Pavement manual (latest edition)

2. Permeable Design Pro software for hydrologic and structural design

3. Tech Specs and Technical Bulletins

1.3 SUBMITTALS
A. Contractor shall submit to the owner for approval a minimum of four full-size samples of each concrete paver type/size/thickness/color/finish specified. The samples shall represent the range of shape, texture, and color permitted for the respective type. Color(s) will be selected by Architect/Engineer/Landscape Architect/Owner from Manufacturer’s standard colors.

B. Prior to delivery of the associated material to the site, the Contractor shall submit the following product-specific documentation for approval:

1. Aggregates
a. Sieve analysis per ASTM C136 for subbase, base, bedding and joint aggregate materials
b. Minimum 3 lb. sample of each material for independent testing.

2. Concrete Pavers:
a. Test results from an independent testing laboratory for compliance to ASTM C936. b. For machine installation projects, stitching details to be used during product placement.
c. Safety Data Sheets (SDS).

3. Geosynthetics
a. One 18-inch x 18-inch panel of each type of geosynthetic (geotextile or geomembrane Liner) to be used for inspection and testing. The sample panels shall be uniformly rolled and shall be wrapped in plastic to protect the material from moisture and damage during shipment. Samples shall be externally tagged for easy identification. External identification shall include the name of the manufacturer; product type; product grade; lot number; and physical dimensions. b. Current National Transportation Product Evaluation Program (NTPEP) evaluation report.
c. Safety Data Sheets (SDS).]
TS-73

Page 190 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-3

1.4 QUALITY ASSURANCE
A. Contractor Qualifications:

1. Contractor shall submit a list of five (5) previously constructed projects of similar size and magnitude prior to the bid date to be qualified. Contact names, telephone numbers, and date of completion shall be listed for each project.

2. The Contractor’s site foreman shall hold a PICP Specialist Designation from the Interlocking Concrete Pavement Institute (ICPI). The site foreman shall be onsite for the entire installation.

3. Contractor shall conform to all local, state/provincial licensing and bonding requirements.

B. Mockups: Build mockups to verify selections made under submittals, to demonstrate aesthetic effects, and to set quality standards for materials and execution.

1. Install a 10 ft x 10 ft paver area following the installation practices described in Article

3.2 to 3.4. This area shall be used to verify joint sizes; lines; laying pattern(s); stitching details (for mechanical installation); color(s); and, texture of the job.

2. To provide a proper representation of color blend, blending during installation of sample mock-up will be pulled from a minimum of 3 cubes.

3. This area shall be the standard from which the work will be judged.

4. Subject to approval by the Owner, the mock-up may be retained as part of the finished work. If mock-up is not retained, remove and dispose of mock-up at the completion of the project.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Contractor shall coordinate delivery and paving schedule to minimize interference with normal use of buildings adjacent to paving.

B. Contractor shall check all materials upon delivery to assure that the proper materials have been received and are in good condition before signing off on the manufacturer’s packing slip.

C. Contractor shall protect all materials from damage or contamination due to job site conditions and in accordance with manufacturer's recommendations. Damaged or contaminated materials shall not be incorporated into the work.

D. Concrete pavers shall be delivered to the site in steel banded, plastic banded, or plastic wrapped cubes capable of transfer by forklift or clamp lift. Unload and store concrete pavers at the job site in such a manner that no damage occurs to the product.

E. Contractor shall handle and transport aggregates to avoid segregation, contamination, and degradation and keep different materials sufficiently separated as to prevent mixing. The material shall not be dumped or stored one material on top of another unless it is part of the installation process. Materials shall be covered to prevent removal by wind.

F. Geosynthetics shall be delivered, stored and handled in accordance with ASTM D4873.

1.6 ENVIRONMENTAL CONDITIONS
A. Pavers shall not be installed during heavy rain, freezing conditions or snowfall.

TS-74

Page 191 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-4
B. Pavers shall not be installed on frozen soil subgrade or aggregates.

1.7 MAINTENANCE MATERIALS
A. Provide [specify quantity] square feet additional paver material for use by Owner for maintenance and repair.

B. Store extra paver materials in Owner-designated location.

PART 2 - PRODUCTS

2.1 PERMEABLE INTERLOCKING CONCRETE PAVERS
A. Interlocking Concrete Pavers Basis-of-Design:

1. Vehicular - Permeable (On-Site)
Belgard - Aqualine 4.5 x 9 x 80mm Permeable - Toscana (formerly Aqua Roc) Pattern: Herringbone
Substitutions: No substitutions permitted.

2. Pedestrian - Interlocking (On-Site)
Belgard - Holland 4 x 8 x 60mm - Toscana
Polymeric Sand: Techniseal- HP NexGel – Tan
Substitutions: No substitutions permitted.

3. Pedestrian – Interlocking (Manhattan Avenue Parkway) Belgard – Avalon Slate 3-pc small and large pattern, Color: Bella Substitutions: Substitutions for an approved equal product that closely matches the existing pavers along the Manhattan Avenue is permitted. Contractor to submit samples of proposed alternatives for approval.

B. Supplier/Local Sales Representative:

Yvonna Garcia
Belgard Architectural Consultant – Southern California
10714 Poplar Ave., Fontana, CA 92337
Cell: 949 281-9692
C. Pavers shall meet the minimum material and physical properties set forth in ASTM C 936, Standard Specification for Interlocking Concrete Paving Units.

1. Measured length or width of test specimens shall not differ by more than +/- 0.063 in, while measured thickness shall not differ by more than +/- 0.125 in.

2. Average compressive strength of 8,000 psi (55 MPa) with no individual unit under 7,200 psi (50 MPa) when tested in accordance with ASTM C140.

3. Average absorption of 5% or less with no unit greater than 7% when tested in accordance with ASTM C140.

4. Freeze-thaw durable as tested in accordance with ASTM C1645. The average mass loss of all specimens tested shall not be greater than (A) 225 g/m2 when subject to 28 freezethaw cycles, or (b) 500 g/m2 when subject to 49 freeze-thaw cycles. Testing shall be conducted using a 3% saline solution.

5. Efflorescence shall not be a cause for rejection.

TS-75

Page 192 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-5

6. Pigment in Concrete Pavers shall conform to ASTM C979.

2.2 AGGREGATE MATERIALS
A. General Requirements:

1. Clean, non-plastic aggregate, free from deleterious or foreign matter, manufactured from crushed rock. Recycled aggregates shall not be used.

2. Percent of angular and sub-angular particles greater than 90%. Rounded river gravel shall not be used.

3. LA Abrasion of the aggregate used shall be less than 40 as per ASTM C131.

4. All aggregates shall be washed and have less than 2% passing the No. 200 (0.075 mm) sieve.

5. All aggregate material gradations shall be tested in accordance with ASTM C136.

B. Bedding Course/Joint Fill Material – open-graded aggregate conforming to the following gradation:

Note: No. 89 or No. 9 stone may be used as joint fill material. If No. 8 stone material is not available locally, No. 89 can be used as a bedding course if choke criteria is met with underlying base aggregate.

ASTM C33 size No. 8
Sieve Size Percent Passing
1/2 in. (12.5 mm) 100
3/8 in. (9.5 mm) 85 to 100
No. 4 (4.75 mm) 10 to 30
No. 8 (2.36 mm) 0 to 10
No. 16 (1.18 mm) 0 to 5
No. 200 (0.075 mm) 0 – 2
C. Base Course Material - open graded aggregate conforming to the following gradation:

ASTM C33 size No. 57
Sieve Size Percent Passing
1-½ in. (37.5 mm) 100
1 in. (25 mm) 95 to 100
1/2 in. (12.5 mm) 25 to 60
3/8 in. (9.5 mm) 0 to 10
No. 4 (4.75 mm) 0 to 5
No. 200 (0.075 mm) 0 - 2
D. Subbase Course Material – open-graded aggregate conforming to the following gradation:

Note: ASTM No. 3 or No. 4 may be used as subbase material if No. 2 stone in unavailable locally.

TS-76

Page 193 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-6
ASTM C33 size No. 2
Sieve Size Percent Passing
3 in. (75 mm) 100
2- ½ in. (63 mm) 90 to 100
2 in. (50 mm) 35 to 70
1-½ in. (37.5 mm) 0 to 15
¾ in. (19 mm) 0 to 5
No. 200 (0.075 mm) 0 – 2

2.3 EDGE RESTRAINTS
A. Edge restraints shall be cast in place concrete curbs in general conformance with the specifications and dimensions in the construction documents

2.4 GEOSYNTHETICS
A. Geotextile and/or geomembrane liner materials shall be selected by the Design Engineer based on the intended use.

B. Only geosynthetics with a current NTPEP evaluation will be accepted.

2.5 PIPE UNDERDRAINS
A. Where shown on the plans, pipe underdrains shall be perforated or slotted PVC pipe manufactured in accordance with ASTM D3034 or corrugated HDPE pipe manufactured in accordance with ASTM D3350 and comply with the requirements of Section 33 46 14.19 - Pipe Underdrains.

PART 3 - EXECUTION

3.1 PREPARATION
A. Prior to commencement of any work, the Contractor shall conduct a pre-construction meeting with the Owner, Designer, and affected sub-trades. The pre-construction meeting should establish contractor responsibilities and at a minimum verify:

1. The location of the mock-up, and whether it will be part of the final construction or need to be removed.

2. The site layout is in general conformance to the construction documents. In particular, the location and elevation of discharge points (if any) of the pipe underdrains.

3. The subgrade lines and elevations are in general conformance with the construction documents. The subgrade elevations shall be within +/- 0.1 ft of the specified grades.

4. The minimum slope of subgrade shall be at least 0.5% or as specified in the design.

5. Subgrade soil conditions and grades meet the requirements in the construction documents.

6. The details of the site’s erosion and sediment control plan.

TS-77

Page 194 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-7

7. Panel Installation drawings for the geomembrane, including the location of any protrusions through a membrane liner where boots are required.

B. Proof-roll prepared subgrade according to requirements in Section 31 20 00 Earth Moving to identify soft pockets and areas of excess yielding. Proceed with subbase installation only after deficient subgrades have been corrected. Scarify subgrade surface following any stabilization efforts before installing subbase course.

C. If compaction is required in the construction documents, Contractor shall verify compaction of the subgrade is in general conformance with the construction documents prior to placing subbase materials.

D. Once the Contractor has confirmed the subgrade conditions are in general conformance with the requirements in the construction documents, the Contractor shall begin installing the subbase material. By initiating installation of the subbase material, the Contractor acknowledges acceptance of the subgrade.

3.2 INSTALLATION OF SUBBASE AND BASE COURSES
A. Keep the area where the pavement is to be constructed free from sediment during the entire job.

Any materials contaminated with sediment shall be removed and replaced with clean material.

B. Install membrane liner and any associated cushion geotextile in accordance with the manufacturer’s recommendations. The membrane liner is applied to the bottom and sides of the excavation for non-infiltration purposes and must include a drainage pipe. Allow for enough membrane liner to exceed the final elevation of the surface. After completion of the surface, the excess liner should be cut flush with the finished grade. Membrane lines shall be welded together and boots installed around all protrusions.

C. Install geotextiles as required in accordance with the specifications and drawings. The geotextile is applied to the bottom and sides of the excavation with overlapping joints a minimum of [12 inches] [24 inches]. Overlaps to be constructed to “shingle” moisture from upstream panel to downstream panel. Allow for enough geotextile to exceed the final elevation of the surface. After completion of the surface, the excess geotextile should be cut flush with the finished grade.

D. Install the subbase course and base course at the thicknesses, compaction rates, surface tolerances, and elevations outlined below.

1. Place and spread the first layer of subbase without displacing or damaging the geosynthetics (if used). To prevent damage, tracked vehicles shall not be allowed directly on the geotextiles or geomembranes during the initial spreading process of the subbase layer.

2. The aggregate should be spread and compacted in uniform layers not exceeding 6-inch loose thickness. Compaction is performed using either a 10 T (10 ton) vibratory roller or a minimum 13,500 lb-f centrifugal force reversible vibratory plate compactor. For each lift, make at least two passes in the vibratory mode and at least two passes in the static mode and continue compaction until there is no visible movement in the materials.

3. At the specified elevation(s), install the pipe underdrains in accordance with the manufacturer’s recommendations. Ensure the pipes are sloped to provide proper drainage to the outlets. Pipes shall be surrounded by a minimum of 4 inches of base course TS-78

Page 195 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-8
material to prevent damage during compaction. Care must be taken not to damage pipe underdrains during subsequent aggregate installation.

4. Final subbase surface tolerance shall be plus or minus 0.1 ft over a 10-foot straight edge laid in any direction.

5. Final base surface tolerance shall be plus or minus 3/4 inch over a 10-foot straight edge laid in any direction.

6. Provide proper compaction near curbs, grade beams, concrete collars around utility structures, lights standards, tree wells, building edges and other protrusions as applicable to the project.

E. Before starting to place the bedding course, the base shall be inspected and approved by the Engineer.

F. Light Weight Deflectometer (LWD) for Compacted Base Aggregate Deflection Testing:

1. After three preloading drops, the maximum average deflection from three additional drops shall be no greater than 0.5 mm.

2. Conduct LWD tests on every (800 tons) of remaining area of compacted base aggregates.]
G. LWD Test Report shall include the following:

1. Project description.

2. Sketch of the test area and numbered test locations.

3. Aggregate type and layer thicknesses.

4. Aggregate characteristic properties: gradation, porosity, bulk density.

5. Compaction equipment type and weight.

6. Static and/or vibratory compaction.

7. Number of passes of the compaction equipment.

8. Average of three deflections for each location.

3.3 INSTALLATION OF EDGE RESTRAINTS
A. All concrete edge restraints shall be constructed to dimensions and grades in general conformance with the construction documents and shall be supported on a compacted base not less than 6-inch thick and meet local requirements or the requirements of Section 32 16 13 Curbs and Gutters whichever are more restrictive. All concrete shall be in accordance with ASTM C94 requirements.

3.4 INSTALLATION OF BEDDING COURSE, PAVERS, AND JOINT MATERIAL A. Spread the bedding course evenly over the base course and screed to a nominal 2 in. thickness utilizing an approved mechanical spreader or by screed rails and boards. Do not use the bedding material to fill depressions in the base course surface. Surface tolerances shall be +/- 3/8 inch over a 10-foot straight edge.

B. Ensure that concrete pavers are free of foreign material before installation. Concrete pavers shall be inspected for color distribution and all chipped, damaged, or discolored concrete pavers shall be replaced. Initiation of concrete paver placement shall be deemed to represent acceptance of the pavers.

TS-79

Page 196 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-9
C. Lay the concrete pavers in the pattern(s) shown on the drawings. Maintain straight pattern lines.

For mechanical installations, follow the stitching details as submitted and verified during the mock-up.

D. Paving units shall be installed simultaneously from a minimum of 3 bundles for hand installations, and 6 bundles for mechanical installations to provide proper color blending.

E. Joints between the individual concrete pavers shall be uniformly maintained and installed in accordance with the in-place dimensions
F. Fill gaps at the edges of the paved area with cut pavers or edge units. Do not install cut pavers smaller than one-third of a whole paver along edges subject to vehicular traffic – trim two pavers to fit.

G. Cut pavers using a masonry saw or splitting device. Upon completion of cutting, the area must be swept clean of all debris.

H. Using a low amplitude plate compactor capable of at least 5,000 lbs. (22 kN) compaction at a frequency of 75 Hz –100 Hz, compact and seat the concrete pavers into the bedding course.

I. The pavers shall be compacted to achieve consolidation of the bedding course and brought to level and profile by not less than three passes. Initial compaction should proceed as closely as possible following the installation of the paving units and prior to the acceptance of any traffic.

J. Any units that are structurally damaged during compaction shall be immediately removed and replaced.

K. Apply the joint material to the surface and sweep into the joints and voids. Fill joints and voids then sweep off excess material before vibrating the material down into the joints using a plate compactor. This will typically require two to three passes with the plate compactor.

L. Do not compact within 6 feet of unrestrained edges of the paving units.

M. All work to within 6 feet (1 m) of the laying face must be left fully compacted at the end of each day.

N. Sweep off excess aggregate when the job is complete.

3.5 AS-BUILT CONSTRUCTION TOLERANCES
A. Final inspection shall be conducted to verify conformance to the drawings after removal of excess aggregate. All pavements shall be finished to lines and levels to ensure positive drainage at all drainage outlets and channels.

B. The final surface elevations shall not deviate more than +/- 3/8 inch under a 10 ft long straight edge.

C. Lippage shall be no greater than 1/8-inch difference in height between adjacent pavers.

D. Bond lines for the pavers shall be +/- 1/2-inch over a 50-foot string ling.

TS-80

Page 197 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PERM. INTERLOCKING CONC. PAVEMENT 321413.19-10
E. Verify the in-situ surface infiltration rate of the permeable pavement is a minimum of 100 in/hour using ASTM C1781.

3.6 MAINTENANCE AND PROTECTION
A. At the completion of the work, the Contractor shall provide the Owner with the manufacturer’s PICP System Operation and Maintenance Guidelines.

B. Once the work is complete, the Owner shall be responsible for protecting the work from sediment deposition and damage due to subsequent construction activity on the site.

C. The Contractor shall return to the site after 6 months from the completion of the work and conduct an inspection of the PICP System with the Owner, Designer, and Contractor in accordance with the PICP System Operation and Maintenance Guidelines.

END OF SECTION 321413.19
TS-81

Page 198 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 1
SECTION 331100 - WATER UTILITY DISTRIBUTION PIPING
PART 1 - GENERAL

1.1 SUMMARY
A. Requirements: Provide water distribution system, complete, as indicated on the Drawings or inferable therefrom and/or as specified in accordance with the Contract Documents.

1.2 SUBMITTALS
A. Product Data: Submit copies of manufacturer's specifications and installation instructions for each material. Include certification or other data verifying compliance with required characteristics. Indicate by transmittal form that copy of each has been distributed to the Installer.

B. Shop Drawings: Submit layout and shop drawings as required under Section Submittals.

Include details of reinforced concrete structures.

C. Test Reports: Submit certified Test Reports showing compliance of the following items in accordance with Section General Conditions.

1. Laboratory test for bedding and trench stabilization materials.

2. Concrete design mix.

3. Compression tests.

4. Water Test Reports: Submit results of water sample tests by State or local health authorities

1.3 QUALITY ASSURANCE
A. Regulatory Requirements:

1. Comply with requirements of utility company supplying water. Include tapping of water mains and backflow prevention.

2. All work to be performed and materials to be used shall be in accordance with the Standard Specifications for Public Works Construction, latest edition and supplements.

3. The Contractor shall have one copy of the Standard Specifications at the job site.

4. The Standard Specifications apply only to performance and materials and how they are to be incorporated into the Work. The legal/contractual relationship sections and the measurement and pavement sections do not apply to this document.

B. Piping materials shall bear label, stamp, or other markings of specified testing agency.

C. Comply with FM's "Approval Guide" or UL's "Fire Protection Equipment Directory" for fireservice-main products.

TS-82

Page 199 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 2
D. NFPA Compliance: Comply with NFPA 24 for materials, installations, tests, flushing, and valve and hydrant supervision for fire-service-main piping for fire suppression.

E. NSF Compliance:

1. Comply with NSF 14 for plastic potable-water-service piping.

2. Comply with NSF 61 for materials for water-service piping and specialties for domestic water.

F. California Health and Safety Code:

1. Per Section 116875 subparagraphs a through d, effective January 1, 2010 as specified in SB 1334, Stat. 2008, c.580 – all domestic water systems have to use lead-free pipes, fixtures, solder or flux.

1.4 PROJECT CONDITIONS
A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify OWNER’S REPRESENTATIVE not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without OWNER’S REPRESENTATIVE written permission.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Prevent damage to materials during loading, transportation, and unloading. Store equipment with moving parts off ground on platforms or skids.

B. COORDINATION
C. Coordinate connection to water main with utility company.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified.

2. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.

TS-83

Page 200 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 3

2.2 PIPE AND FITTINGS
A. Ductile-Iron Pipe (NPS 4 to NPS 6): AWWA C151, Class 200 with cement mortar lining complying with AWWA C104 and one mil thick bituminous coating.

1. Fittings: Mechanical-Joint, Ductile-Iron Fittings: AWWA C110, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern. a. Glands, Gaskets, and Bolts: AWWA C111, ductile- or gray-iron glands, rubber gaskets, and steel bolts. Use corrosion resistant, high strength, low alloy steel, bolts and nuts where in contact with corrosive soil ASTM A 325.

2. Fittings: Push-on-Joint, Ductile-Iron Fittings: AWWA C110, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern. Use corrosion resistant, high strength, low alloy steel, bolts and nuts where in contact with corrosive soil ASTM A 325.
a. Gaskets: AWWA C111, rubber.

B. PVC, Schedule 40 (NPS 1/8 to NPS 3 ½): ASTM D 1785. Suitable for potable water distribution and manufactured in compliance with NSF Standards.

1. Fittings: PVC, Schedule 40 Socket Fittings: ASTM D 2466.

C. PVC, AWWA Pipe (NPS 4 to NPS 12): AWWA C900, Class 200 DR 14, with bell-and-spigot or double-bell ends.

1. PVC to PVC Fittings: Push-on-Joint, PVC Fittings, ASTM 3139, with elastomeric gasket bell ends, conforming to ASTM D2122 for bell measurements.

2. PVC to Metal Fittings, Valves, and Accessories: Mechanical-Joint, Ductile-Iron Fittings:

AWWA C110, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.
a. Glands, Gaskets, and Bolts: AWWA C111, ductile- or gray-iron glands, rubber gaskets, and steel bolts. Use corrosion resistant, high strength, low alloy steel, bolts and nuts where in contact with corrosive soil ASTM A 325.

2.3 VALVES
A. AWWA, UL/FM Cast-Iron, Gate Valves:

1. Nonrising-Stem, Resilient-Seated Gate Valves: AWWA C509 and UL/F.M. approved, gray- or ductile-iron body and bonnet; with bronze or gray- or ductile-iron gate, resilient seats, bronze stem, and stem nut.
a. Minimum Working Pressure: 200 psig.
b. End Connections: Flanged, push-on rubber gasketed, or mechanical joint, as required.
c. Interior Coating: Complying with AWWA C550.

TS-84

Page 201 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 4

2.4 GATE VALVE ACCESSORIES AND SPECIALTIES
A. Valve Boxes: Comply with AWWA M44 for cast-iron valve boxes. Include top section, adjustable extension of length required for depth of burial of valve, plug with lettering "WATER," bottom section with base of size to fit over valve, and approximately five-inch diameter barrel. Fabricate valve box cover to fit snugly to prevent displacement by traffic.

1. Operating Wrenches: Steel tee-handle with one pointed end, stem of length to operate deepest buried valve, and socket matching valve operating nut.

B. Vertical-Type Indicator Posts: UL 789, FM-approved, cast-iron body with operating wrench, extension rod, and adjustable cast-iron barrel of length required for depth of burial of valve with tamperproof electrical supervisory switch for connection to the fire alarm control panel system.

2.5 VALVE APPLICATION
A. General Application: Use mechanical-joint-end valves for NPS 3 and larger underground installation. Use threaded- or flanged-end valves for installation in vaults. Use UL/FM, nonrising-stem gate valves for installation with indicator posts. Use corporation valves and curb valves with ends compatible with piping, for NPS 2 and smaller installation.

1. Where specific valve types are not indicated, the following requirements apply:
a. Underground Valves, NPS 3 and Larger: AWWA, cast-iron, nonrising-stem, resilient-seated, gate valves with valve box.
b. Underground Valves, NPS 4 and Larger, for Vertical-Type Indicator Posts:

UL/FM, Cast-iron, nonrising-stem gate valves with indicator post.

2.6 CORROSION-PROTECTION ENCASEMENT FOR PIPING
A. Polyethylene Encasement for Underground Ductile-Iron Pipe and Fittings: Polyethylene encasement of eight mils thickness shall conform to AWWA C105. Joint tape shall be self sticking PVC or polyethylene, eight mils thick.

B. Fusion-Bonded Epoxy Coatings for Ductile-Iron and Gray-Iron Fittings: Epoxy coating shall conform to AWWA C116.

2.7 WATER METERS
A. Water meter(s) indicated on drawings shall be installed by the local water purveyor for the area, unless noted otherwise.

2.8 BACKFLOW-PREVENTION DEVICES
A. General: FM Approved, AWWA, UL Classified, Approved by the Foundation for Cross Connection Control and Hydraulic Research at the University of Southern California.

1. Working Pressure: 175 psi minimum, unless otherwise indicated.

TS-85

Page 202 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 5

2. Interior Components: Corrosion-resistant materials.

3. Exterior Components: Assembly shall be provided with flanged connections, galvanized cast-iron or epoxy coated construction.

B. Reduced-Pressure-Detector Assembly Backflow Preventers: Suitable for continuous pressure application. Include outside screw and yoke gate valves on inlet and outlet, and strainer on inlet. Include test cocks; pressure-differential relief valve with ASME A112.1.2, air-gap fitting located between two positive-seating check valves; and bypass with displacement-type water meter, valves, and reduced-pressure backflow preventer. Include tamperproof electrical supervisory switch for connection to tie the fire alarm control panel system.

2.9 FIRE HYDRANTS
A. Before procurement, verify approval has been issued by the Fire Department having jurisdiction.

B. Wet-Barrel Fire Hydrants: AWWA C503 or UL 312, one NPS 4 and two NPS 2-1/2 outlets, NPS 6 threaded or flanged inlet, and base section with NPS 6 mechanical-joint inlet. Include interior coating according to AWWA C550. Hydrant shall have 150-psig minimum workingpressure design.

1. Outlet Threads: NFPA 1963, with external hose thread used by local fire department.

Include cast-iron caps with steel chains.

2. Operating and Cap Nuts: Pentagon, one and one-half inches point to flat.

3. Direction of Opening: Open hydrant valves by turning operating nut to left or counterclockwise.

C. Combined length of bury and extension shall be as indicated. Where not indicated, install top of hydrant flange three inches above finished surface.

D. Exterior Finish: “O.S.H.A. safety yellow” Ameritone 719 or approved equal after receiving a prime coat.

PART 3 - EXECUTION

3.1 INSPECTION
A. Examination: Examine substrates, adjoining construction and conditions under which Work is to be installed. Do not proceed with Work until unsatisfactory conditions have been corrected

3.2 PREPARATION
A. Field Measurements: Verify dimensions before proceeding with Work. Obtain field measurements for work required to be accurately fitted to other construction. Be responsible for accuracy of such measurements and precise fitting and assembly of finished work.

3.3 JOINT CONSTRUCTION
TS-86

Page 203 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 6
A. Make pipe joints according to the following:

1. Ductile-Iron Piping, Gasketed Joints for Water-Service Piping: AWWA C600 and AWWA M41.

2. Ductile-Iron Piping, Gasketed Joints for Fire-Service-Main Piping: UL 194.

3. Copper Tubing Soldered Joints: ASTM B 828. Use flushable flux and lead-free solder.

4. PVC Piping Gasketed Joints: Use joining materials according to AWWA C900.

Construct joints with elastomeric seals and lubricant according to ASTM D 2774 or ASTM D 3139 and pipe manufacturer's written instructions.

5. Dissimilar Materials Piping Joints: Use adapters compatible with both piping materials, with OD, and with system working pressure.

3.4 PIPING INSTALLATION
A. Project site water lines shall terminate approximately five feet from buildings, unless otherwise indicated on Drawings. Install temporary cap or plug terminals for future connection to building.

B. Bury piping with depth of cover over top at least 36 inches, unless otherwise indicated.

C. Comply with NFPA 24 for fire-service-main piping materials and installation.

D. Install ductile-iron, water-service piping according to AWWA C600 and AWWA M41.

E. Install copper tube and fittings according to CDA's "Copper Tube Handbook." F. Install PVC, AWWA pipe according to AWWA M23 and ASTM F 645.

G. Install underground piping with restrained joints at horizontal and vertical changes in direction.

Use restrained-joint piping, thrust blocks, anchors, tie-rods and clamps, and other supports for all lines NPS 3 or greater.

H. Water Main Connection: Arrange and pay for tap in the water main, water meter, and all associated fees from the water purveyor.

3.5 CLEARANCE OF WATER LINE
A. Building or Structure: Two feet minimum horizontal separation.

B. Sewer crossing:

1. Typical Conditions: Lay water mains over sanitary sewers to provide vertical separation minimum three feet.

2. Unusual Conditions: If above separation cannot be met, for sewers less than three feet below the water pipe, use the following:
a. Install water line with all joints located at least four feet from each side of the sewer pipe.
b. Sewer pipe encased in six inches concrete around pipe, and extend four feet either side of water main.

TS-87

Page 204 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 7
C. Parallel to Sewer Line: Water line shall not be installed in a common trench with the building sanitary sewer unless both of the following requirements are met:

1. The bottom of the water pipe, at all points, shall be at least 12 inches above the top of the sewer.

2. The water pipe shall be placed on a solid shelf excavated at one side of the common trench with a minimum clear horizontal distance of at least 12 inches from the sewer.

3.6 ANCHORAGE INSTALLATION
A. Install anchorages for tees, plugs and caps, bends, crosses, valves, and hydrant branches for all lines NPS 3 or greater. Include anchorages for the following piping systems:

1. Gasketed-Joint, Ductile-Iron, Water-Service Piping: According to AWWA C600.

2. Gasketed-Joint, PVC Water-Service Piping: According to AWWA M23.

3. Fire-Service-Main Piping: According to NFPA 24.

4. Apply full coat of asphalt or other acceptable corrosion-resistant material to surfaces of installed ferrous anchorage devices.

3.7 VALVE INSTALLATION
A. Gate Valves: Comply with AWWA C600 and AWWA M44. Install each underground valve with stem pointing up and with valve box.

B. Vertical-Type Indicator Post Gate Valves: Comply with NFPA 24. Install each underground valve and valves in vaults with stem pointing up and with vertical cast-iron indicator post.

Include tamperproof electrical supervisory switch for connection to tie the fire alarm control panel system.

3.8 BACKFLOW-PREVENTER INSTALLATION
A. Install backflow preventers of type, size, and capacity indicated. Include valves and test cocks.

Install according to requirements of plumbing and health department and authorities having jurisdiction.

B. Do not install backflow preventers with relief drain in vault or other space subject to flooding.

C. Do not install bypass piping around backflow preventers.

D. Support three-inch and larger backflow preventers, valves, and piping near floor and on brick or concrete piers.

E. Access and clearance shall be provided for the required testing, maintenance and repair. Access and clearance shall require a minimum of one foot between the lowest portion of the assembly and grade or platform.

F. Include tamperproof electrical supervisory switch for connection to tie the fire alarm control panel system.

TS-88

Page 205 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 8

3.9 FIRE HYDRANT INSTALLATION
A. General: Install each fire hydrant with separate gate valve in supply pipe, anchor with restrained joints or thrust blocks, and support in upright position.

B. UL/FM-Type Fire Hydrants: Comply with NFPA 24.

3.10 IDENTIFICATION
A. Install continuous underground detectable warning tape during backfilling of trench for underground water-service piping. Locate below finished grade, directly over piping. Refer to Division 31 Section "Earth Moving" for tape specifications.

3.11 FIELD QUALITY CONTROL
A. Piping Tests: Conduct piping tests before joints are covered and after thrust blocks have hardened sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only potable water.

B. Hydrostatic Tests: The piping shall be subjected for a minimum of two hours to a pressure of one and one-half times the working pressure, but in no case less than 150 psi. Examine all exposed pipe, joints, fittings and accessories during the test period. Replace or repair defective portions of the system, and repeat tests until results are satisfactory.

1. Allowable leakage shall be as specified in AWWA C-600, Table 3.

C. Prepare reports of testing activities.

3.12 CLEANING
A. Clean and disinfect water-distribution piping as follows:

1. Purge new water-distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use.

2. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or as described below:
a. Fill system or part of system with water/chlorine solution containing at least 50 ppm of chlorine; isolate and allow to stand for 24 hours, or b. Drain system or part of system of previous solution and refill with water/chlorine solution containing at least 200 ppm of chlorine; isolate and allow to stand for three hours.
c. After standing time, flush system with clean, potable water until no chlorine remains in water coming from system.
d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedure if biological examination shows evidence of contamination.

B. Prepare reports of purging and disinfecting activities.

TS-89

Page 206 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 WATER UTILITY DISTRIBUTION PIPING 331100 - 9
END OF SECTION 331100
TS-90

Page 207 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 STORM UTILTY DRAINAGE PIPING 334100 - 1
SECTION 334100 - STORM UTILITY DRAINAGE PIPING
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes gravity-flow, nonpressure storm drainage pipe and drainage structures outside the building.

1.2 PERFORMANCE REQUIREMENTS
A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water.

1.3 SUBMITTALS
A. Product Data: For each type of product installed.

B. Field quality-control test reports.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified.

2.2 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS
A. Pipe and Fittings: ASTM A 74, Service class.

B. Gaskets: ASTM C 564, rubber.

C. Calking Materials: ASTM B 29, pure lead and oakum or hemp fiber.

2.3 PVC PIPE AND FITTINGS
A. PVC Sewer Pipe and Fittings, NPS 15 and Smaller: ASTM D 3034, SDR 35, with bell-andspigot ends for gasketed joints with ASTM F 477, elastomeric seals.

TS-91

Page 208 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 STORM UTILTY DRAINAGE PIPING 334100 - 2
B. PVC Sewer Pipe and Fittings, NPS 18 and Larger: ASTM F 679, T-2 wall thickness, with belland-spigot ends for gasketed joints with ASTM F 477, elastomeric seals.

2.4 NONPRESSURE-TYPE PIPE COUPLINGS
A. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined and corrosion-resistant-metal tension band and tightening mechanism on each end.

B. Sleeve Materials:

1. For Cast-Iron Soil Pipes: ASTM C 564, rubber.

2. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC.

3. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined.

C. Unshielded Flexible Couplings: Elastomeric sleeve with corrosion-resistant-metal tension band and tightening mechanism on each end.

1. Manufacturers:
a. Dallas Specialty & Mfg. Co.
b. Fernco Inc.
c. Logan Clay Products Company (The).
d. Mission Rubber Company; a division of MCP Industries, Inc. e. NDS Inc.
f. Plastic Oddities, Inc.

D. Shielded Flexible Couplings: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.

1. Manufacturers:
a. Cascade Waterworks Mfg.
b. Dallas Specialty & Mfg. Co.
c. Mission Rubber Company; a division of MCP Industries, Inc. d. Any equivalent manufacturer.

E. Ring-Type Flexible Couplings: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring.

1. Manufacturers:
a. Fernco Inc.
b. Logan Clay Products Company (The).
c. Mission Rubber Company; a division of MCP Industries, Inc. d. Any equivalent manufacturer.

TS-92

Page 209 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 STORM UTILTY DRAINAGE PIPING 334100 - 3

2.5 MANHOLES
A. Standard Precast Concrete Manholes: ASTM C 478, precast, reinforced concrete, of depth indicated, with provision for sealant joints.

1. Diameter: 48 inches minimum, unless otherwise indicated.

2. Ballast: Increase thickness of precast concrete sections or add concrete to base section, as required to prevent flotation.

3. Base Section: 6-inch minimum thickness for floor slab and 4-inch minimum thickness for walls and base riser section, and having separate base slab or base section with integral floor.

4. Riser Sections: 4-inch minimum thickness, and of length to provide depth indicated.

5. Top Section: Eccentric-cone type unless concentric-cone or flat-slab-top type is indicated. Top of cone of size that matches grade rings.

6. Joint Sealant: ASTM C 990 bitumen or butyl rubber.

7. Resilient Pipe Connectors: ASTM C 923, cast or fitted into manhole walls, for each pipe connection.

8. Steps: Individual FRP steps, FRP ladder, or ASTM A 615/A 615M, deformed, 1/2-inch steel reinforcing rods encased in ASTM D 4101, PP wide enough to allow worker to place both feet on 1 step and designed to prevent lateral slippage off of step. Cast or anchor steps into sidewalls at 12- to 16-inch intervals. Omit steps if total depth from floor of manhole to finished grade is less than 60 inches.

9. Adjusting Rings: Interlocking rings with level or sloped edge in thickness and diameter matching manhole frame and cover. Include sealant recommended by ring manufacturer.

10. Grade Rings: Reinforced-concrete rings, 6- to 9-inch total thickness, to match diameter of manhole frame and cover.

11. Manhole Frames and Covers: Ferrous; 24-inch ID by 7- to 9-inch riser with 4-inchminimum width flange and 26-inch- diameter cover. Include indented top design with lettering cast into cover, using wording "STORM DRAIN." a. Material: ASTM A 536, Grade 60-40-18 ductile iron or ASTM A 48, Class 35 gray iron, unless otherwise indicated.

2.6 CONCRETE
A. General: Cast-in-place concrete according to ACI 318/318R, ACI 350R, and the following:

1. Cement: ASTM C 150, Type II.

2. Fine Aggregate: ASTM C 33, sand.

3. Coarse Aggregate: ASTM C 33, crushed gravel.

4. Water: Potable.

B. Ballast and Pipe Supports: Portland cement design mix, 3250-psi minimum, with 0.45 maximum water-cementitious materials ratio.

1. Reinforcement Fabric: ASTM A 185, steel, welded wire fabric, plain.

2. Reinforcement Bars: ASTM A 615/A 615M, Grade 60, deformed steel.

TS-93

Page 210 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 STORM UTILTY DRAINAGE PIPING 334100 - 4

2.7 CATCH BASINS
A. Standard Precast Concrete Catch Basins: ASTM C 478, precast, reinforced concrete, of depth indicated, with provision for sealant joints.

1. Base Section: 6-inch minimum thickness for floor slab and 4-inch minimum thickness for walls and base riser section, and having separate base slab or base section with integral floor.

2. Top Section: Eccentric-cone type unless flat-slab-top type is indicated.

3. Joint Sealant: ASTM C 990, bitumen or butyl rubber.

B. Frames and Grates: ASTM A 536, Grade 60-40-18, ductile iron designed for A-16 (heavy traffic) structural loading unless otherwise indicated. Include 24-inch ID by 7- to 9-inch riser with 4-inch minimum width flange, and 26-inch- diameter flat grate with small square or shortslotted drainage openings.

1. Grate Free Area: Approximately 50 percent, unless otherwise indicated.

PART 3 - EXECUTION

3.1 PIPING APPLICATIONS
A. Pipe couplings and fittings with pressure ratings at least equal to piping rating may be used in applications below, unless otherwise indicated.

1. Use nonpressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping, unless otherwise indicated.
a. Shielded flexible couplings for same or minor difference OD pipes. b. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation.

3.2 PIPING INSTALLATION
A. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for using lubricants, cements, and other installation requirements.

B. Install manholes for changes in direction if shown on plan, otherwise use fittings. Use fittings for branch connections unless direct tap into existing sewer is indicated.

C. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.

D. Install gravity-flow, nonpressure drainage piping according to the following:

TS-94

Page 211 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 STORM UTILTY DRAINAGE PIPING 334100 - 5

1. Install piping pitched down in direction of flow, at minimum slope of 1 percent, unless otherwise indicated.

2. Install hub-and-spigot, cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook."

3. Install PVC sewer piping according to ASTM D 2321 and ASTM F 1668.

E. Clear interior of piping and manholes of dirt and superfluous material as work progresses.

3.3 PIPE JOINT CONSTRUCTION
A. Join gravity-flow, nonpressure drainage piping according to the following:

1. Join hub-and-spigot, cast-iron soil piping with gasket joints according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for compression joints.

2. Join hub-and-spigot, cast-iron soil piping with calked joints according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for lead and oakum calked joints.

3. Join PVC sewer piping according to ASTM D 2321 and ASTM D 3034 for elastomericgasket joints.

4. Join dissimilar pipe materials with nonpressure-type flexible couplings.

3.4 MANHOLE INSTALLATION
A. General: Install manholes, complete with appurtenances and accessories indicated.

B. Install precast concrete manhole sections with sealants according to ASTM C 891.

C. Set tops of frames and covers flush with finished surface of manholes that occur in pavements.

Set tops 3 inches above finished surface elsewhere, unless otherwise indicated.

3.5 CATCH BASIN INSTALLATION
A. Set frames and grates to elevations indicated.

3.6 CONNECTIONS
A. Connect nonpressure, gravity-flow drainage piping to building's storm building drains specified in Division 15 Section "Storm Drainage Piping."
B. Make connections to existing piping and underground manholes.

1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch overlap, with not less than 6 inches of concrete with 28-day compressive strength of 3250 psi.

TS-95

Page 212 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 STORM UTILTY DRAINAGE PIPING 334100 - 6

3.7 FIELD QUALITY CONTROL
A. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.

1. Do not enclose, cover, or put into service before inspection and approval.

2. Test completed piping systems according to requirements of authorities having jurisdiction.

3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice.

4. Submit separate report for each test.

5. Hydrostatic Tests: Test sewers according to requirements of authorities having jurisdiction and the following:
a. Allowable leakage is maximum of 50 gal./inch of nominal pipe size per mile of pipe, during 24-hour period.
b. Close openings in system and fill with water.
c. Purge air and refill with water.
d. Disconnect water supply.
e. Test and inspect joints for leaks.

6. Option: Test ductile-iron piping according to AWWA C600, "Hydrostatic Testing" Section. Use test pressure of at least 10 psig.

7. Air Tests: Test storm drainage according to requirements of authorities having jurisdiction, UNI-B-6, and the following:
a. Option: Test plastic gravity sewer piping according to ASTM F 1417.

B. Leaks and loss in test pressure constitute defects that must be repaired.

C. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified.

END OF SECTION 334100
TS-96

Page 213 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021

PART IV

LANDSCAPE AND IRRIGATION

SPECIFICATIONS
TS-97

Page 214 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 1
SECTION 328400 - PLANTING IRRIGATION
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Piping.

2. Manual valves.

3. Automatic control valves.

4. Automatic drain valves.

5. Sprinklers.

6. Quick couplers.

7. Controllers.

8. Boxes for automatic control valves.

1.2 PERFORMANCE REQUIREMENTS
A. Irrigation zone control shall be automatic operation with controller and automatic control valves.

B. Location of Sprinklers and Specialties: Design location is approximate. Make minor adjustments necessary to avoid plantings and obstructions such as signs and light standards.

Maintain 100 percent irrigation coverage of areas indicated.

C. Delegated Design: Design 100 percent coverage irrigation system, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
a.

D. Minimum Working Pressures: The following are minimum pressure requirements for piping, valves, and specialties unless otherwise indicated:

1. Irrigation Main Piping: 200 psig.

2. Circuit Piping: 150 psig.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Wiring Diagrams: For power, signal, and control wiring.

TS-98

Page 215 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 2
C. Delegated-Design Submittal: For irrigation systems indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.4 INFORMATIONAL SUBMITTALS
A. Zoning Chart: Show each irrigation zone and its control valve.

B. Controller Timing Schedule: Indicate timing settings for each automatic controller zone.

C. Field quality-control reports.

1.5 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.

1.6 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

PART 2 - PRODUCTS

2.1 PIPES, TUBES, AND FITTINGS
A. Comply with requirements in the piping schedule for applications of pipe, tube, and fitting materials, and for joining methods for specific services, service locations, and pipe sizes.

B. Galvanized-Steel Pipe: ASTM A53/A53M, Standard Weight, Type E, Grade B.

1. Galvanized-Steel Pipe Nipples: ASTM A733, made of ASTM A53/A53M or ASTM A106/A106M, Standard Weight, seamless-steel pipe with threaded ends.

2. Galvanized, Gray-Iron Threaded Fittings: ASME B16.4, Class 125, standard pattern.

3. Malleable-Iron Unions: ASME B16.39, Class 150, hexagonal-stock body with ball-andsocket, metal-to-metal, bronze seating surface, and female threaded ends.

4. Cast-Iron Flanges: ASME B16.1, Class 125.

C. Ductile-Iron Pipe with Push-on Joint: AWWA C151, with push-on-joint bell and spigot ends.

1. Push-on-Joint, Ductile-Iron Fittings: AWWA C110, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.
a. Gaskets: AWWA C111, rubber.

D. Hard Copper Tube: ASTM B88, Type L, and ASTM B88, Type M, water tube, drawn temper.

TS-99

Page 216 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 3

1. Copper Pressure Fittings: ASME B16.18, cast-copper-alloy or ASME B16.22, wroughtcopper solder-joint fittings. Furnish wrought-copper fittings if indicated.

2. Bronze Flanges: ASME B16.24, Class 150, with solder-joint end.

3. Copper Unions: MSS SP-123, cast-copper-alloy, hexagonal-stock body, with ball-andsocket, metal-to-metal seating surfaces and solder-joint or threaded ends.

E. PE Pipe with Controlled ID: ASTM F771, PE 3408 compound; SIDR 11.5 and SIDR 15.

1. Insert Fittings for PE Pipe: ASTM D2609, nylon or propylene plastic with barbed ends.

Include bands or other fasteners.

F. PVC Pipe: ASTM D1785, PVC 1120 compound, Schedules 40 and 80.

1. PVC Socket Fittings: ASTM D2466, Schedules 40 and 80.

2. PVC Threaded Fittings: ASTM D2464, Schedule 80.

3. PVC Socket Unions: Construction similar to MSS SP-107, except both headpiece and tailpiece shall be PVC with socket ends.

G. PVC Pipe, Pressure Rated: ASTM D2241, PVC 1120 compound, SDR 21 and SDR 26.

1. PVC Socket Fittings: ASTM D2467, Schedule 80.

2. PVC Socket Unions: Construction similar to MSS SP-107, except both headpiece and tailpiece shall be PVC with socket or threaded ends.

2.2 PIPING JOINING MATERIALS
A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch thick unless otherwise indicated; full-face or ring type unless otherwise indicated.

B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.

C. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for generalduty brazing unless otherwise indicated.

D. Solder Filler Metals: ASTM B32, lead-free alloys. Include water-flushable flux according to ASTM B813.

E. Solvent Cements for Joining PVC Piping: ASTM D2564. Include primer according to ASTM F656.

F. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer unless otherwise indicated.

2.3 MANUAL VALVES
A. Curb Valves:

1. Description:

TS-100

Page 217 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 4
a. Standard: AWWA C800.
b. NPS 1 and Smaller Pressure Rating: 150 psig.
c. NPS 1-1/4 to NPS 2 Pressure Rating: 150 psig.
d. Body Material: Brass or bronze with ball or ground-key plug. e. End Connections: Matching piping.
f. Stem: With wide-tee head.

B. Curb-Valve Casing:

1. Standard: Similar to AWWA M44 for cast-iron valve casings.

2. Top Section: Telescoping, of length required for depth of burial of curb valve.

3. Barrel: Approximately 3-inch diameter.

4. Plug: With lettering "WATER."

5. Bottom Section: With base of size to fit over valve.

6. Base Support: Concrete collar.

C. Shutoff Rods for Curb-Valve Casings: Furnish one steel, tee-handle shutoff rod(s) with one pointed end, stem of length to operate deepest buried valve, and slotted end matching curb valve for Project.

D. Brass Ball Valves:

1. MATCO-NORCA Model 759 LF

2. Description:
a. Standard: MSS SP-110.
b. SWP Rating: 150 psig.
c. CWP Rating: 600 psig.
d. Body Design: Two piece.
e. Body Material: Forged brass.
f. Ends: Threaded or solder joint if indicated.
g. Seats: PTFE or TFE.
h. Stem: Brass.
i. Ball: Chrome-plated brass.
j. Port: Full.

E. Plastic Ball Valves:

1. Kbi, Speurs, Lasco

2. Description:
a. Standard: MSS SP-122.
b. Pressure Rating: 125 psig minimum.
c. Body Material: PVC.
d. Type: Union.
e. End Connections: Socket or threaded.
f. Port: Full.

TS-101

Page 218 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 5

2.4 AUTOMATIC CONTROL VALVES
A. Bronze, Automatic Control Valves:

1. GRISWOLD DWS-PRV

2. Description: Cast-bronze body, normally closed, diaphragm type with manual-flow adjustment, and operated by 24-V ac solenoid.

2.5 SPRINKLERS
A. General Requirements: Designed for uniform coverage over entire spray area indicated at available water pressure.

B. Plastic, Pop-up, Gear-Drive Rotary Sprinklers:

1. RAINBIRD 1800-SAM-PRS 6” POPOUP with HUNTER MP ROTATOR NOZZLE

2. Description:
a. Body Material: ABS.
b. Nozzle: ABS.
c. Retraction Spring: Stainless steel.
d. Internal Parts: Corrosion resistant.

3. Capacities and Characteristics:
a. Flow: 40 gpm.
b. Pop-up Height: 6 inches aboveground to nozzle.
c. Arc: varies
d. Radius: varies
e. Inlet: NPS 1/2.

C. Plastic, Surface Spray Sprinklers:

1. RAINBIRD 1800-SAM-PRS 6” POPUPS

2. Description:
a. Body Material and Flange: ABS.
b. Pattern: Fixed, with flow adjustment.

3. Capacities and Characteristics:
a. Nozzle: Varies
b. Flow: Varies
c. Arc: Varies
d. Radius: Varies
e. Inlet: NPS 1/2.

D. Plastic, Pop-up Spray Sprinklers:

1. RAINBIRD 1800-SAM-PRS 6” POPUP W 5Q-5 NOZZLE
TS-102

Page 219 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 6

2. Description:
a. Body Material: ABS.
b. Nozzle: ABS.
c. Retraction Spring: Stainless steel.
d. Internal Parts: Corrosion resistant.
e. Pattern: Fixed, with flow adjustment.
f. Nozzle: ABS.
g. Flow: 40 gpm.
h. Inlet: NPS 1/2.

2.6 QUICK COUPLERS
A. Description: Factory-fabricated, bronze or brass, two-piece assembly. Include coupler waterseal valve; removable upper body with spring-loaded or weighted, rubber-covered cap; hose swivel with ASME B1.20.7, 3/4-11.5NH threads for garden hose on outlet; and operating key.

1. Locking-Top Option: Vandal-resistant locking feature. Include two matching key(s).

2.7 CONTROLLERS
A. Calsense CS 3000
B. Description:

1. Controller Stations for Automatic Control Valves: Each station is variable from approximately 5 to 60 minutes. Include switch for manual or automatic operation of each station.

2. Exterior Control Enclosures: NEMA 250, Type 4, weatherproof, with locking cover and two matching keys; include provision for grounding.
a. Body Material: Stainless-steel sheet metal.
b. Mounting: Freestanding type for concrete base.

3. Control Transformer: 24-V secondary, with primary fuse.

4. Timing Device: Adjustable, 24-hour, 14-day clock, with automatic operations to skip operation any day in timer period, to operate every other day, or to operate two or more times daily.
a. Manual or Semiautomatic Operation: Allows this mode without disturbing preset automatic operation.
b. Nickel-Cadmium Battery and Trickle Charger: Automatically powers timing device during power outages.
c. Surge Protection: Metal-oxide-varistor type on each station and primary power.

5. Wiring: UL 493, Type UF multiconductor, with solid-copper conductors; insulated cable; suitable for direct burial.
a. Feeder-Circuit Cables: No. 12 AWG minimum, between building and controllers.

TS-103

Page 220 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 7
b. Low-Voltage, Branch-Circuit Cables: No. 14 AWG minimum, between controllers and automatic control valves; color-coded different from feeder-circuit-cable jacket color; with jackets of different colors for multiple-cable installation in same trench.
c. Splicing Materials: Manufacturer's packaged kit consisting of insulating, springtype connector or crimped joint and epoxy resin moisture seal; suitable for direct burial.

6. Concrete Base: Reinforced precast concrete not less than 36 by 24 by 4 inches thick, and 6 inches greater in each direction than overall dimensions of controller. Include opening for wiring.

2.8 BOXES FOR AUTOMATIC CONTROL VALVES
A. Plastic Boxes:

1. Description: Box and cover, with open bottom and openings for piping; designed for installing flush with grade.
a. Size: As required for valves and service.
b. Shape: Round Rectangular.
c. Sidewall Material: PE, ABS, or FRP.
d. Cover Material: PE, ABS, or FRP.
1) Lettering: "VALVE BOX." And QC, PB, SB, FS, MV ,V#.

B. Drainage Backfill: Cleaned gravel or crushed stone, graded from 3/4 inch minimum to 3 inches maximum.

PART 3 - EXECUTION

3.1 EARTHWORK
A. Excavating, trenching, and backfilling are specified in Section 312000 "Earth Moving." B. Install warning tape directly above pressure piping, 12 inches below finished grades, except 6 inches below subgrade under pavement and slabs.

C. Drain Pockets: Excavate to sizes indicated. Backfill with cleaned gravel or crushed stone, graded from 3/4 to 3 inches, to 12 inches below grade. Cover gravel or crushed stone with sheet of asphalt-saturated felt and backfill remainder with excavated material.

D. Provide minimum cover over top of underground piping according to the following:

1. Irrigation Main Piping: Minimum depth of 36 inches below finished grade, or not less than 18 inches below average local frost depth, whichever is deeper.

2. Circuit Piping: 12 inches.

3. Drain Piping: 12 inches.

TS-104

Page 221 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 8

4. Sleeves: 24 inches.

3.2 PIPING INSTALLATION
A. Location and Arrangement: Drawings indicate location and arrangement of piping systems.

Install piping as indicated unless deviations are approved on Coordination Drawings.

B. Install piping at minimum uniform slope of 0.5 percent down toward drain valves.

C. Install piping free of sags and bends.

D. Install groups of pipes parallel to each other, spaced to permit valve servicing.

E. Install fittings for changes in direction and branch connections.

F. Install unions adjacent to valves and to final connections to other components with NPS 2 or smaller pipe connection.

G. Install flanges adjacent to valves and to final connections to other components with NPS 2-1/2 or larger pipe connection.

H. Install underground thermoplastic piping according to ASTM D2774 and ASTM F690.

I. Install expansion loops in control-valve boxes for plastic piping.

J. Lay piping on solid subbase, uniformly sloped without humps or depressions.

K. Install ductile-iron piping according to AWWA C600.

L. Install PVC piping in dry weather when temperature is above 40 deg F. Allow joints to cure at least 24 hours at temperatures above 40 deg F before testing.

3.3 JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

TS-105

Page 222 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 9
D. Copper-Tubing Brazed Joints: Construct joints according to CDA's "Copper Tube Handbook," using copper-phosphorus brazing filler metal.

E. Copper-Tubing Soldered Joints: Apply ASTM B813 water-flushable flux to tube end unless otherwise indicated. Construct joints according to ASTM B828 or CDA's "Copper Tube Handbook," using lead-free solder alloy (0.20 percent maximum lead content) complying with ASTM B32.

F. PVC Piping Solvent-Cemented Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

1. Comply with ASTM F402 for safe-handling practice of cleaners, primers, and solvent cements.

2. PVC Pressure Piping: Join schedule number, ASTM D1785, PVC pipe and PVC socket fittings according to ASTM D2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D2855.

3. PVC Nonpressure Piping: Join according to ASTM D2855.

3.4 VALVE INSTALLATION
A. Underground Curb Valves: Install in curb-valve casings with tops flush with grade.

B. Underground Iron Gate Valves, Resilient Seat: Comply with AWWA C600 and AWWA M44.

Install in valve casing with top flush with grade.

1. Install valves and PVC pipe with restrained, gasketed joints.

3.5 SPRINKLER INSTALLATION
A. Install sprinklers after hydrostatic test is completed.

B. Install sprinklers at manufacturer's recommended heights.

C. Locate part-circle sprinklers to maintain a minimum distance of 6 inches from walls and 6 inches from other boundaries unless otherwise indicated.

3.6 AUTOMATIC IRRIGATION-CONTROL SYSTEM INSTALLATION
A. Equipment Mounting: Install interior controllers on concrete bases.

1. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install anchor bolts to elevations required for proper attachment to supported equipment.

B. Equipment Mounting: Install exterior freestanding controllers on precast concrete bases.

1. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

TS-106

Page 223 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 10

2. Install anchor bolts to elevations required for proper attachment to supported equipment.

C. Install control cable in same trench as irrigation piping and at least 2 inches below or beside piping. Provide conductors of size not smaller than recommended by controller manufacturer.

Install cable in separate sleeve under paved areas.

3.7 IDENTIFICATION
A. Identify system components. Comply with requirements for identification specified in Section 220553 "Identification for Plumbing Piping and Equipment." B. Equipment Nameplates and Signs: Install engraved plastic-laminate equipment nameplates and signs on each automatic controller.

1. Text: In addition to identifying unit, distinguish between multiple units, inform operator of operational requirements, indicate safety and emergency precautions, and warn of hazards and improper operations.

C. Warning Tapes: Arrange for installation of continuous, underground, detectable warning tapes over underground piping during backfilling of trenches. See Section 312000 "Earth Moving" for warning tapes.

3.8 FIELD QUALITY CONTROL
A. Perform tests and inspections.

B. Tests and Inspections:

1. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.

2. Operational Test: After electrical circuitry has been energized, operate controllers and automatic control valves to confirm proper system operation.

3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

C. Any irrigation product will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

3.9 ADJUSTING
A. Adjust settings of controllers.

B. Adjust automatic control valves to provide flow rate at rated operating pressure required for each sprinkler circuit.

C. Adjust sprinklers and devices, except those intended to be mounted aboveground, so they will be flush with, or not more than 1/2 inch above, finish grade.

TS-107

Page 224 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTING IRRIGATION 328400 - 11

3.10 PIPING SCHEDULE
A. Install components having pressure rating equal to or greater than system operating pressure.

B. Aboveground irrigation main piping, 1-2”, shall be the following:

1. Class 315, PVC pipe; socket-type PVC fittings; and solvent-cemented joints.

C. Underground irrigation main piping, 1-2”, shall be the following:

1. Class 315, PVC pipe and socket fittings, and solvent-cemented joints.

D. Circuit piping, ¾-1.25”, shall be the following:

1. Schedule 40, PVC pipe and socket fittings; and solvent-cemented joints.

E. Underground Branches and Offsets at Sprinklers and Devices: Schedule 80, PVC pipe; threaded PVC fittings; and threaded joints.

1. Option: Plastic swing-joint assemblies, with offsets for flexible joints, manufactured for this application.

F. Risers to Aboveground Sprinklers and Specialties: Schedule 80, PVC pipe and socket fittings; and solvent-cemented joints.

3.11 VALVE SCHEDULE
A. Underground, Shutoff-Duty Valves: Use the following:

1. NPS 2 and Smaller: Curb valve, curb-valve casing, and shutoff rod.

2. NPS 3 and Larger: Iron gate valve, resilient seated; iron gate valve casing; and operating wrench(es).

END OF SECTION 328400
TS-108

Page 225 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 1
SECTION 32 91 13 - SOIL PREPARATION
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes planting soils specified by composition of the mixes.

B. Related Requirements:

1. Section 311000 "Site Clearing" for topsoil stripping and stockpiling.

1.2 DEFINITIONS
A. Duff Layer: A surface layer of soil, typical of forested areas, that is composed of mostly decayed leaves, twigs, and detritus.

B. Imported Soil: Soil that is transported to Project site for use.

C. Manufactured Soil: Soil produced by blending soils, sand, stabilized organic soil amendments, and other materials to produce planting soil.

D. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified as specified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

E. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.

F. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

G. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil"; but in disturbed areas such as urban environments, the surface soil can be subsoil.

H. USCC: U.S. Composting Council.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at City Hall.

1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.

TS-109

Page 226 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 2
B. Samples: For each bulk-supplied material in sealed containers labeled with content, source, and date obtained; providing an accurate representation of composition, color, and texture.

C. Samples of fertilizers, organic amendment, soil conditioners, shall be submitted to the Engineer for inspection seventy-two (72) hours prior to incorporation in the work.

1.5 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.

1.6 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent, state-operated, or university-operated laboratory; experienced in soil science, soil testing, and plant nutrition; with the experience and capability to conduct the testing indicated; and that specializes in types of tests to be performed.

B. Soil Analysis: If the contract documents do not include an agricultural suitability report, Contractor may, at the request of the Agency and/or construction manager (CM), after rough grading, provide for agricultural suitability testing and a written report by a qualified soil-testing laboratory. Recommendations of agricultural suitability and fertility analysis soils report, after review by Agency and/or construction manager (CM), may take precedence over these specifications.

1. The soil-testing laboratory shall oversee soil sampling. Quantity of test sites shall be determined by Agency and/or project construction manager (CM).

2. Report suitability of tested soil for plant growth.
a. Recommendations for nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory planting soil suitable for healthy, viable plants.
b. Report presence of problem salts, minerals, or heavy metals; if present, provide additional recommendations for corrective action.

PART 2 - PRODUCTS

2.1 PLANTING SOILS SPECIFIED BY COMPOSITION
A. Topsoil: Topsoil shall consist of fertile, friable soil of loamy character, and shall contain an amount of organic matter normal to the area. It shall be reasonably free from weeds, refuse, roots, heavy or stiff clay, stones larger than one inch (1”) in diameter, sticks, brush, litter and other deleterious substances. Topsoil may be obtained from the site if approved by the Agency.

1. For bidding purposes, or in the event a Soils Analysis as described in Article 1.6 Paragraph B is not performed, the following amendments shall be uniformly cultivated TS-110

Page 227 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 3
into the upper six inches (6”), per 1000 square feet, of soil by suitable equipment operated at approximate right angles in at least two (2) directions. a. Nitrogen stabilized organic amendment: 4 CY
b. 16-20-0 Ammonium phosphate: 10 LBS
c. Agricultural Gypsum: 100 LBS
d. Soil Sulfur: 20 LBS
B. Backfill for Plant Pits: Backfill shall be machine-mixed and approved by the Engineer prior to incorporation in planting pits. For bidding purposes, or in the event a Soils Analysis as described in Article 1.6 Paragraph B is not performed, the following amendments shall be provided

1. On-site Soil: 6 parts by volume

2. Nitrogen stabilized organic amendment 4 parts by volume

3. 16-20-0 1 pound per CY of mix

4. Iron Sulfate 2 pounds per CY of mix

5. Agricultural Gypsum 10 pounds per CY of mix

2.2 INORGANIC SOIL AMENDMENTS
A. For bidding purposes, or in the event a Soils Analysis as described in Article 1.6 Paragraph B is not performed, the following inorganic amendments shall be provided.

1. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows:
a. Class: T, with a minimum of 99 percent passing through a No. 8 sieve and a minimum of 75 percent passing through a No. 60 sieve.
b. Class: O, with a minimum of 95 percent passing through a No. 8 sieve and a minimum of 55 percent passing through a No. 60 sieve.

2. Sulfur: Granular, biodegradable, and containing a minimum of 90 percent elemental sulfur, with a minimum of 99 percent passing through a No. 6 sieve and a maximum of 10 percent passing through a No. 40 sieve.

3. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

4. Perlite: Horticultural perlite, soil amendment grade.

TS-111

Page 228 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 4

5. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through a No. 50 sieve.

6. Sand: Clean, washed, natural or manufactured, free of toxic materials, and according to ASTM C 33/C 33M.

2.3 ORGANIC SOIL AMENDMENTS
A. Nitrogen stabilized organic amendment shall be a ground or processed wood product derived from wood of redwood, fir or cedar, treated with a non-toxic agent to absorb water quickly.

Nitrogen content, based on dry weight, shall be 0.5% for redwood and 0.7% for fir and cedar.

Iron content, based on dry weight, shall be 0.1%.

B. Wood derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture and free of chips, stones, sticks, soil or toxic materials.

C. Pine sawdust is not acceptable.

2.4 FERTILIZERS
A. Fertilizers shall comply with applicable requirements of the State Agricultural Codes and shall be packaged, first grade, commercial quality products identified as to source, type of material, weight and manufacturer’s guaranteed analysis. Fertilizers shall not contain toxic ingredients in quantities harmful to human, animal, or plant life.

B. Commercial fertilizer shall be pelleted or granular product having the chemical analysis specified herein and shall be free-flowing material delivered in original unopenend containers.

Use of material which becomes caked or otherwise damaged shall not be permitted.

C. Organic base fertilizer shall be a highly concentrated humate material derived from decomposed animal, fish, and vegetable matter with humic acids and trace minerals.

D. Iron sulfate shall be ferrous sulfate containing not less than twenty-one and one-half percent (21.5%) iron expressed as metallic iron.

PART 3 - EXECUTION

3.1 GENERAL
A. Place planting soil and fertilizers according to requirements in other Specification Sections.

B. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in planting soil.

TS-112

Page 229 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 5

3.2 PREPARATION OF UNAMENDED, ON-SITE SOIL BEFORE AMENDING A. Excavation: Excavate soil from designated area(s) to a depth of 6 inches and stockpile until amended.

B. Unacceptable Materials: Clean soil of concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials that are harmful to plant growth.

C. Unsuitable Materials: Clean soil to contain a maximum of 8 percent by dry weight of stones, roots, plants, sod, clay lumps, and pockets of coarse sand.

D. Screening: remove stones larger than 1 inch in diameter.

3.3 PLACING AND MIXING PLANTING SOIL OVER EXPOSED SUBGRADE A. General: Apply and mix unamended soil with amendments on-site to produce required planting soil. Do not apply materials or till if existing soil or subgrade is muddy, or excessively wet.

B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Agency’s property.

C. Mixing: Spread unamended soil to total depth 6 inches, but not less than required to meet finish grades after mixing with amendments and natural settlement. Do not spread if soil or subgrade is muddy, or excessively wet.

1. Amendments: Apply soil amendments and fertilizer, if required, evenly on surface, and thoroughly blend them with unamended soil to produce planting soil. a. Mix lime and sulfur, if required, with dry soil before mixing fertilizer. b. Mix fertilizer with planting soil no more than seven days before planting.

2. Lifts: Apply and mix unamended soil and amendments in lifts not exceeding 8 inches in loose depth for material compacted by compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

D. Compaction: Compact each blended lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 and tested in-place except where a different compaction value is indicated on Drawings.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.4 PLACING MANUFACTURED PLANTING SOIL OVER EXPOSED SUBGRADE A. General: Apply manufactured soil on-site in its final, blended condition. Do not apply materials or till if existing soil or subgrade is muddy, or excessively wet.

TS-113

Page 230 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 6
B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Agency's property.

C. Application: Spread planting soil to total depth of 6 inches, but not less than required to meet finish grades after natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.

1. Lifts: Apply planting soil in lifts not exceeding 8 inches in loose depth for material compacted by compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

D. Compaction: Compact each lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 except where a different compaction value is indicated on Drawings.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.5 BLENDING PLANTING SOIL IN PLACE
A. General: Mix amendments with in-place, unamended soil to produce required planting soil. Do not apply materials or till if existing soil or subgrade is muddy, or excessively wet.

B. Preparation: Till unamended, existing soil in planting areas to a minimum depth 6 inches.

Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Agency's property.

C. Mixing: Apply soil amendments and fertilizer, if required, evenly on surface, and thoroughly blend them into full depth of unamended, in-place soil to produce planting soil.

1. Mix lime and sulfur, if required, with dry soil before mixing fertilizer.

2. Mix fertilizer with planting soil no more than seven days before planting.

D. Compaction: Compact blended planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 except where a different compaction value is indicated on Drawings.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.6 FIELD QUALITY CONTROL
A. Testing Agency: The Agency will engage a qualified testing agency to perform tests and inspections.

B. Perform the following tests:

TS-114

Page 231 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SOIL PREPARATION 329113 - 7

1. Compaction: Test planting-soil compaction after placing each lift and at completion using a densitometer or soil-compaction meter calibrated to a reference test value based on laboratory testing according to ASTM D 698. Space tests at no less than one for each 1000 sq. ft. of in-place soil or part thereof.

C. Soil will be considered defective if it does not pass tests.

D. Prepare test reports.

E. Label each sample and test report with the date, location keyed to a site plan or other location system, visible conditions when and where sample was taken, and sampling depth.

3.7 PROTECTION AND CLEANING
A. Protection Zone: Identify protection zones according to Section 015639 "Temporary Tree and Plant Protection."
B. Protect areas of in-place soil from additional compaction, disturbance, and contamination.

Prohibit the following practices within these areas except as required to perform planting operations:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Vehicle traffic.

4. Foot traffic.

5. Erection of sheds or structures.

6. Impoundment of water.

7. Excavation or other digging unless otherwise indicated.

C. Remove surplus soil and waste material including excess subsoil, unsuitable materials, trash, and debris and legally dispose of them off Owner's property unless otherwise indicated.

1. Dispose of excess subsoil and unsuitable materials on-site where directed by Owner.

END OF SECTION 329113
TS-115

Page 232 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TURF AND GRASSES 329200 - 1
SECTION 329200 - TURF AND GRASSES
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Seeding.

2. Sodding.

1.2 DEFINITIONS
A. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

B. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

See Section 329113 "Soil Preparation and drawing designations for planting soils.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at City Hall.

1.4 INFORMATIONAL SUBMITTALS
A. Certification of grass seed.

1. Certification of each seed mixture for turfgrass sod.

2. Certification of each seed mixture for hydroseed.

B. Product certificates.

1.5 QUALITY ASSURANCE
A. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful turf establishment.

1. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress.

2. Personnel Certifications: Installer's field supervisor shall have certification in one of the following categories from the Professional Landcare Network:

TS-116

Page 233 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TURF AND GRASSES 329200 - 2
a. Landscape Industry Certified Technician - Exterior.
b. Landscape Industry Certified Lawncare Manager.
c. Landscape Industry Certified Lawncare Technician.

3. Pesticide Applicator: State licensed, commercial.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and Federal laws, as applicable.

B. Sod: Harvest, deliver, store, and handle sod according to requirements in "Specifications for Turfgrass Sod Materials" and "Specifications for Turfgrass Sod Transplanting and Installation" sections in TPI's "Guideline Specifications to Turfgrass Sodding." Deliver sod within 24 hours of harvesting and in time for planting promptly. Protect sod from breakage and drying.

PART 2 - PRODUCTS

2.1 SEED
A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Rules for Testing Seeds" for purity and germination tolerances.

B. Seed Species:

1. Quality: State-certified seed of grass species as listed below for solar exposure.

2. Quality: Seed of grass species as listed below for solar exposure, with not less than 85 percent germination, not less than 95 percent pure seed, and not more than 0.5 percent weed seed.

C. Grass-Seed Mix: Proprietary seed mix as follows:

1. Products: Basis of Design, provide mix as indicated on the Drawings.

2.2 TURFGRASS SOD
A. Turfgrass Sod: CertifiedNumber 1 Quality/Premium, including limitations on thatch, weeds, diseases, nematodes, and insects, complying with "Specifications for Turfgrass Sod Materials" in TPI's "Guideline Specifications to Turfgrass Sodding." Furnish viable sod of uniform density, color, and texture that is strongly rooted and capable of vigorous growth and development when planted.

B. Turfgrass Species: Basis of Design, provide sod as indicated on the Drawings.

TS-117

Page 234 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TURF AND GRASSES 329200 - 3

2.3 FERTILIZERS
A. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

1. Composition: 1 lb/1000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

B. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

2.4 PESTICIDES
A. General: Pesticide, registered and approved by the EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction.

PART 3 - EXECUTION

3.1 TURF AREA PREPARATION
A. General: Prepare planting area for soil placement and mix planting soil according to Section 329113 "Soil Preparation."
B. Reduce elevation of planting soil to allow for soil thickness of sod.

C. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

D. Before planting, obtain Architect's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

3.2 SEEDING
A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph.

1. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other.

2. Do not use wet seed or seed that is moldy or otherwise damaged.

3. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer.

TS-118

Page 235 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TURF AND GRASSES 329200 - 4
B. Sow seed at a total rate of 5 to 8 lb/1000 sq. ft.

C. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray.

D. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose thickness over seeded areas.

1. Anchor straw mulch by crimping into soil with suitable mechanical equipment.

E. Protect seeded areas from hot, dry weather or drying winds by applying planting soil within 24 hours after completing seeding operations. Soak areas, scatter mulch uniformly to a thickness of 3/16 inch, and roll surface smooth.

3.3 SODDING
A. Lay sod within 24 hours of harvesting. Do not lay sod if dormant or if ground is frozen or muddy.

B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch or overlap. Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to soil or sod during installation. Tamp and roll lightly to ensure contact with soil, eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass.

1. Lay sod across slopes exceeding 1:3.

2. Anchor sod on slopes exceeding 1:6 with wood pegs or steel staples spaced as recommended by sod manufacturer but not less than two anchors per sod strip to prevent slippage.

C. Saturate sod with fine water spray within two hours of planting. During first week after planting, water daily or more frequently as necessary to maintain moist soil to a minimum depth of 1-1/2 inches below sod.

3.4 TURF MAINTENANCE
A. General: Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf.

Provide materials and installation the same as those used in the original installation.

B. Mow turf as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than one-third of grass height. Remove no more than one-third of grass-leaf growth in initial or subsequent mowings.

3.5 SATISFACTORY TURF
A. Turf installations shall meet the following criteria as determined by Architect:

TS-119

Page 236 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TURF AND GRASSES 329200 - 5

1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.

2. Satisfactory Sodded Turf: At end of maintenance period, a healthy, well-rooted, evencolored, viable turf has been established, free of weeds, open joints, bare areas, and surface irregularities.

B. Use specified materials to reestablish turf that does not comply with requirements, and continue maintenance until turf is satisfactory.

END OF SECTION 329200
TS-120

Page 237 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 1
SECTION 329300 - PLANTS
PART 1 - GENERAL

1.1 SCOPE OF WORK
A. Contractor shall provide all labor, materials, and equipment for the installation of plant material as indicated on the drawings and as specified herein.

1.2 COORDINATION
A. Contractor shall coordinate planting with other site improvements. Unless otherwise specified, structural improvements shall be constructed prior to planting operations.

B. Contractor shall be responsible for locating and staking existing sewer, water and utility lines above or below grade that might be damaged as a result of planting operation. Contractor shall assume sole responsibility for any cost incurred due to damage and for replacement of aforementioned utilities.

C. All work on the irrigation system, including hydrostatic and coverage tests, operational tests, and the backfilling and compaction of trenches shall be performed prior to planting operations.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at City Hall.

1.4 SUBMITTALS
A. When requested, Contractor shall furnish the Engineer with a delivery receipt and Certificate of Compliance stating that the material substantially meets the specifications.

B. Contractor shall provide a representative color photo of each type of plant material to be installed on the project to the Engineer for review at least four (4) weeks prior to incorporation into the work.

1.5 REPAIR and REPLACEMENT
A. Costs incurred due to repair or replacement of defective or damaged work, rejected materials, workmanship and damage to utilities or sparse turf areas shall be the responsibility of the Contractor.

B. Replacement plant material shall be of the same species, variety, size and condition as shown on the drawings and specified herein, and shall be guaranteed for one (1) full year from the date of planting
TS-121

Page 238 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 2

1.6 QUALITY ASSURANCE
A. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress.

1. Pesticide Applicator: State licensed, commercial.

B. Provide quality, size, genus, species, and variety of plants indicated, complying with applicable requirements in ANSI Z60.1.

1.7 DELIVERY, STORAGE, AND HANDLING
A. Do not prune trees and shrubs before delivery. Protect bark, branches, and root systems from sun scald, drying, wind burn, sweating, whipping, and other handling and tying damage. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of plants during shipping and delivery. Do not drop plants during delivery and handling.

B. Handle planting stock by root ball.

C. Deliver plants after preparations for planting have been completed, and install immediately. If planting is delayed more than six hours after delivery, set plants and trees in their appropriate aspect (sun, filtered sun, or shade), protect from weather and mechanical damage, and keep roots moist.

1.8 POST INSTALLATION MAINTENANCE PERIOD
A. Provide post installation maintenance as prescribed herein.

1. Contractor shall provide all labor, materials, equipment and incidentals to perform work during the Post-Installation Maintenance Period, as specified herein, including but not limited to; litter removal, drain cleaning, hardscape sweeping, adequate watering of plant materials, mowing, fertilizing, replacing unsuitable plant material and controlling weeds, rodents and other pests.

2. Shall commence on the first day after the completion of planting.

3. Maintenance during Plant Establishment shall include eradicating weeds, eradicating insects and diseases, and protecting areas from traffic, watering, and erosion.

4. Contractor shall maintain the project on a continuous basis for ninety (90) calendar days.

Areas shall be so cared for as to present a neat and clean condition at all times.

5. Working days when the Contractor fails to adequately perform maintenance operations as specified herein will not be credited as time of Post-Installation Maintenance Period.

6. Post-Installation Maintenance Period may be extended by the Engineer if the Project is improperly maintained, appreciable replacement is required, or other corrective work becomes necessary.

TS-122

Page 239 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 3

7. Contractor shall schedule a monthly walkthrough inspection five (5) calendar days prior to the first thirty (30) calendar days. This notification and inspection time should continue for the duration of the maintenance period until acceptance of the work.

Contractor shall correct deficiencies before the next monthly walkthrough or maintenance period shall be extended accordingly.

8. At the end of the Post-Installation Maintenance Period, all areas shall be in a weed-free condition.

B. Specialty Type Operations

1. Notification shall be given to the Agency seventy-two (72) hours prior to the Contractor performing “specialty-type” operations, including but not limited to; fertilization, chemical weed abatement and turf aerification, de-thatching and fungicide applications.

2. Contractor shall apply spray chemicals when air currents are still; preventing drifting onto adjoining property and preventing toxic exposure to persons whether or not they are in, or near, the project.

C. Protection

1. Contractor shall be responsible for fencing and maintaining adequate protection of the site. Costs incurred due to damage or replacement shall be the responsibility of the Contractor.

D. Public Interface

1. Contractor shall be responsible for fencing and maintaining adequate protection of the site. Costs incurred due to damage or replacement shall be the responsibility of the Contractor.

E. Repair and Replacement

1. Dead or dying container plant material shall be immediately replaced with material of the same species and size and guaranteed as described in these specifications.

2. Costs incurred due to repair or replacement of irrigation equipment shall be the responsibility of the Contractor. Replacement parts shall be identical to the material specified herein and on the drawings.

PART 2 - PRODUCTS

2.1 CONTAINER GROWN PLANT MATERIAL QUALITY
A. Plant material shall be in accordance with the California State Department of Agriculture’s regulations for nursery inspections, rules and grading. All plants shall be of No. 1 Grade and have a normal habit of growth, and shall be sound, healthy, vigorous and free of insect infestations, plant diseases, sun scalds, fresh bark abrasions or other objectionable TS-123

Page 240 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 4
disfigurements. All plants shall have a normal, well-developed branch system and vigorous and fibrous root system which are not pot bound and are free of kinked or girdling roots.

2.2 CONTAINER GROWN PLANT MATERIAL
A. Nursery grown stock shall be selected from high quality, well-shaped stock, grown under climatic conditions similar to those in the project locale. Minimum acceptable size of plants specified shall correspond with that normally expected for the species and variety of commercially available nursery stock.

B. Caliper shall be the diameter of the trunk one foot (1’) above the ground surface and shall be the determining measurement for trees when specified.

C. Oversize plants may be used if not root bound, but shall not increase the Contract price. Up to ten percent (10%) of undersize plants in any one (1) variety and grade may be used; provided they are larger than the average size of the next smaller grade.

D. Scientific and common names conform to customary nursery usage, Hortus Third, or the Checklist of Woody Ornamental Plants of California, Oregon, and Washington.

E. Types, sizes and quantities of plant materials shall be as indicated on the drawings. The plant list shown on the drawings shall be used as a guide only; Contractor shall verify quantities by Contractor’s own plan check.

F. The Engineer reserve the right to refuse or reject any unsuitable plant material. Unsuitable plants shall be removed from the project site and replaced at the Contractor’s expense. New plants shall be the same species, variety, size and condition as specified.

G. Pruning of plant materials shall not be done prior to delivery. After planting, as directed by the Engineer, pruning shall be limited that which is necessary to remove injured twigs and branches, deadwood, and suckers.

H. Plant material specified is subject to substitution based upon availability. Substituted materials shall be approved in advance by the Engineer and shall conform to the requirements of those originally specified and be supplied by the Contractor.

2.3 WOOD MULCH
A. Wood mulch shall be a ground or processed wood product derived from fir or cedar, or from the bark of fir or pine, free of stones, sticks, and toxic substances harmful to plants and stabilized with nitrogen.

2.4 WEED-CONTROL BARRIERS
A. Nonwoven Geotextile Filter Fabric, if required: Polypropylene or polyester fabric, 3 oz./sq. yd. minimum, composed of fibers formed into a stable network so that fibers retain their relative position. Fabric shall be inert to biological degradation and resist naturally encountered chemicals, alkalis, and acids.

TS-124

Page 241 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 5

2.5 PESTICIDES
A. General: Pesticide registered and approved by the Environmental Protection Agency (EPA), acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction.

2.6 POST INSTALLATION MAINTENANCE
A. Fertilizer: Provide fertilizer as specified in Fertilizer Article.

PART 3 - EXECUTION

3.1 MATERIAL DELIVERY AND INSPECTION
A. Plant material shall be delivered with legible identification labels, handled and stored adequately to maintain a healthy condition. They shall be protected from drying out, windburn or any other injury. Container plant material shall not be picked up by stems or trunks.

B. Inspection of plant materials required by State or Federal authorities shall be the responsibility of the Contractor. Secure any permits or certificates, if required by the jurisdiction having authority, prior to delivery of plants to project site.

C. Plants shall be inspected and approved by the Engineer, at the Contractor’s source prior to delivery to the project site and until acceptance of the work, for size, variety, condition, latent defects and injuries. Engineer to provide acceptance letter to the Agency after delivery of the plant material to the project site.

3.2 FINISH GRADING
A. Finish grading shall be completed prior to weed abatement operations. The Agency, at its own expense, may conduct a soils test at the completion of grading operations. See Section 31 20 00 for additional grading requirements.

3.3 WEED ABATEMENT OPERATIONS
A. The irrigation system, soil preparation operations, and finish grade shall be approved by the Engineer prior to weed abatement operations.

B. Contractor shall operate the irrigation system to keep planting areas uniformly moist for a period of two (2) weeks (14 calendar days). At the end of the two (2) week period, Contractor shall spray all visible weeds with an approved non-selective, post emergent herbicide.

Application rate and method shall be recommended by the manufacturer. After spraying, planting areas shall remain unwatered for a minimum of forty-eight (48) hours.

TS-125

Page 242 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 6
C. After seven (7) calendar days from the chemical application, weeds and debris shall be disposed of off-site.

D. Contractor shall apply spray chemicals when air currents are still; preventing drifting onto adjoining property and preventing any toxic exposure to persons whether or not they are in or near the project.

E. After weed abatement operations, and as determined by the Engineer, planting areas shall be scarified to a depth not to exceed one inch (1”). The Engineer shall approve weed abatement operations prior to sodding, if applicable.

F. Weeds and debris shall be disposed of off-site.

3.4 INSTALLATION OF CONTAINER GROWN PLANT MATERIAL
A. Plant trees, shrubs, and ground cover as indicated on the drawings and specified herein as soon as the site and weather conditions are suitable.

B. Planting operations shall be performed only during periods when beneficial results can be obtained. When drought, excessive moisture or other unsatisfactory conditions prevail, the work shall be suspended. When special conditions warrant a variance to the planting operations proposed planting times shall be submitted to and approved by the Engineer.

C. Install trees before turf is installed, if applicable.

D. Stake plant locations and secure approval from the Engineer before excavating pits, making necessary adjustments as requested by the Engineer.

E. Excavated pits shall have vertical, roughened sides, and uncompacted bottoms. Glazed surfaces created by using an auger shall be scarified. Dust sides of pits with gypsum before backfilling.

F. Plants shall be set plumb and held into position until sufficient soil/backfill has been firmly placed around roots or ball. Container-grown material shall be installed such that the collars of the plants are slightly higher than immediate adjacent grades.

G. Containers shall be opened and removed in such a manner that the plant root ball is not injured.

Non-biodegradable containers of platforms shall be removed without damage to the plant or root system. Biodegradable containers shall be split.

H. Test for percolation shall be done to determine positive drainage of plant pits. The Engineer shall be notified of all soil and drainage conditions detrimental to growth of plant material.

Contractor shall submit proposal for correcting the condition.

I. Trees shall be staked at time of planting as indicated on the drawings.

J. Unsuitable soil encountered in excavation shall be disposed of off-site and acceptable soil shall be provided.

K. Water all planting areas thoroughly after installation of plant materials. Additional backfill shall be added to fill voids caused by water settlement.

TS-126

Page 243 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 7
L. Inspection of all planting shall be made at the end of the construction to establish the time for the beginning of the Post-Installation Maintenance Period.

M. Except in turf areas, plants shall be set in a temporary watering basin as indicated on the drawings.

N. Areas around the plants shall be regarded to indicated finish grade.

3.5 PLANTING AREA MULCHING
A. Mulch backfilled surfaces of planting areas and other areas indicated.

1. Mulch in Planting Areas: Apply thickness as indicated on drawings of mulch over whole surface of planting area, and finish level with adjacent finish grades. Do not place mulch within 6 inches of trunks or stems.

3.6 POST INSTALLATION MAINTENANCE PERIOD
A. Weed Control.

1. Before weeds exceed two inches (2”) in height, they shall be removed and disposed of off-site. Serious weed pests (i.e. blackberry, nut sedge or bind weed) shall be sprayed with an approved non-selective, post-emergent herbicide and left in place for seven (7) calendar days. Application rate and method shall be as recommended by the manufacturer. As determined by the Engineer, a second application shall be made seven (7) days after the first application. With both applications, areas sprayed shall remain unwatered for a minimum of forty-eight (48) hours. Dead weeds shall be removed seven (7) calendar days after second application and disposed of off-site.

2. If the Engineer notifies the Contractor of failure to control weeds as specified herein, the Contractor shall kill all weeds within ten (10) calendar days of such notification. The Post-Installation Maintenance Period will be extended for every day after ten (10) calendar days until such weeds have been killed.

B. Irrigation System.

1. Contractor shall operate the irrigation system automatically and shall properly and completely maintain all parts of the irrigation system during both the Post-Installation Maintenance Period.

2. Contractor shall adjust irrigation system to deliver water in sufficient quantities to maintain plant material in a healthy condition and adjust water application to compensate for seasonal conditions.

3. Irrigation system is designed for watering five (5) days a week, 11 p.m. to 4 a.m. with even distribution.

C. Trees and Shrubs.

TS-127

Page 244 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 PLANTS 329300 - 8

1. Installed plants shall be maintained in a healthy growing condition. Maintenance operations shall begin immediately after each plant is installed and shall continue until the post-installation maintenance period commences. This maintenance shall include, but not be limited to: watering, pruning, wound dressing, straightening, and other industryrelated, customary and necessary procedure for healthy and vigorous growth. Plant beds and earth saucers shall be kept free of weeds, grass, and other undesirable vegetation.

Plants shall be checked for settlement and shall be reset at proper grade as necessary.

Run-off, puddling, and wilting shall be prevented.

2. Fifteen (15) calendar days after the beginning of the Post-Installation Maintenance Period, container plant material as part of the Contract shall be fed with a commercial fertilizer at rates recommended by the manufacturer. No fertilizer shall be applied directly at the crown and/or during the months of September through February.

3. Dead or dying plant material shall be immediately replaced with material of the same species and size and guaranteed as described in these specifications.

4. Trees planted as part of the Contract shall be pruned or headed back, as requested by the Engineer, to eliminate diseased or damaged growth, reduce the risk of toppling or wind damage, maintain growth within space limitations, maintain natural appearance, and to balance the crown with the root structure.

5. Staking of trees shall be checked frequently for damage, and to prevent chafing and girdling. Costs incurred due to damage or replacement of staking materials shall be the responsibility of the Contractor.

6. Contractor shall provide a clearance of not less than seven feet (7’) in height over walks, slabs and active play areas, and not less than fourteen feet (14’) in height over roadways.

7. As approved by the Engineer, all wounds over one and one-half inch (1 ½”) in diameter may be sealed with a tree seal.

3.7 GUARANTEE
A. Contractor shall guarantee new trees through one (1) full year after the date of acceptance of the work.

END OF SECTION 329300
TS-128

Page 245 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 NON-VEGETATIVE SITE MATERIALS 329310 - 1
SECTION 329310 – NON-VEGETATIVE SITE MATERIALS
PART 1 - GENERAL

1.1 SCOPE OF WORK
A. Contractor shall provide all labor, materials, tools, equipment, and incidentals for establishing subgrade, ensuring flow lines are maintained, performing weed abatement operations and furnishing, loading, hauling, and placing non-vegetative surface or subbase materials as indicated on the drawings and specified herein.

1.2 MATERIAL SAMPLES
A. Contractor shall submit samples of materials to the Engineer for review and approval prior to purchase and installation.

1.3 QUALITY MEASUREMENT
A. Quantities of non-vegetative surface materials will be as measured in place and compensated for at the Contract unit prices bid.

B. Quantities of non-vegetative subsurface materials shall be as indicated in the unit price bid for the various item of work.

1.4 PROTECTION
A. Contractor shall provide all necessary protection to prevent injury to humans, animals, or adjacent plant life and property occasioned by application of weed abatement materials or soil sterilant for decomposed granite.

B. Contractor will be held responsible for all personal injury or property damage caused by application or storage of such materials.

PART 2 - PRODUCTS

2.1 DECOMPOSED GRANITE
A. Decomposed granite shall be the product of crushing rock or gravel; clean, hard, sound durable, uniform in quality, and free of any detrimental quantity of soft, friable, think elongated or laminated pieces, disintegrated material, organic matter, oil or other deleterious material.

B. Color shall be as indicated on the drawings. Contractor shall submit a sample to Engineer prior to purchase of material.

TS-129

Page 246 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 NON-VEGETATIVE SITE MATERIALS 329310 - 2
C. Soil sterilant for decomposed granite areas shall be Lacco-Bor by Los Angeles Chemical Company, Spike 8OW by Elanco Products, Poly-Bor-Chlorate by United States Borox and Chemical Corporation, or an approved equal.

D. Soil stabilizer, if applicable, for decomposed granite areas shall be Polypavement by Polypavement (323-954-2240), Soil Secure by Southwest Boulder & Stone (800-540-1147), or approved equal.

PART 3 - EXECUTION

3.1 INSTALLATION
A. Contractor shall furnish and place decomposed granite on compacted and sterilized subgrade in areas as indicated on the drawings and according to the details.

B. If applicable, thoroughly blend the stabilizer into the decomposed granite by mechanical means per manufacturer’s recommendations.

C. Prior to placing the decomposed granite surfacing, the subgrade shall be cleaned of all foreign substances. Ruts or soft, yielding spots that may appear in subgrade, areas having inadequate compaction, and deviations of the surface from requirements set forth therein shall be corrected by loosening, removing, and by adding approved material, reshaping to line and grade, and recompacting to specified density requirements and as approved by the Engineer.

D. Soil sterilant shall be applied per manufacturer’s recommendation and applied by or under the direct supervision of someone holding a State of California Qualified Application Certificate.

E. Material shall be level to a uniform thickness so that the layer, after compaction, will not be less than the indicated thickness.

F. Decomposed granite shall be compacted to at least eighty-five (85%) of maximum density obtainable and shall be hydroseeded as turf.

G. Finish surface shall not vary more than two one-hundredths foot (0.02’) from required grades adjacent to both paved and unpaved areas.

H. Adjustments shall be made in placing, spreading, or finishing procedures as may be directed by the Engineer to obtain a uniform layer thickness and true grades, to minimize segregation and degradation where pertinent, to reduce or increase water content, and to insure a satisfactory course.

I. Materials found unsatisfactory shall be replaced or reworked at the Contractor’s expense to produce satisfactory material.

3.2 GUARANTEE
A. Contractor shall guarantee new trees through one (1) full year after the date of acceptance of the work.

TS-130

Page 247 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 NON-VEGETATIVE SITE MATERIALS 329310 - 3
END OF SECTION 329310
TS-131

Page 248 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SITE FURNITURE AND AMENITIES 329320 - 1
SECTION 329320 – SITE FURNITURE AND AMENITIES
PART 1 - GENERAL

1.1 SCOPE OF WORK
A. Contractor shall provide all labor, materials, tools, equipment, and incidentals to furnish, assemble and install Site Furniture and Amenities as indicated on the drawings and specified herein, including but not limited to excavation and backfilling, fine grading, footings, painting, and related appurtenances.

1.2 SUBMITTALS
A. Within fifteen (15) calendar days after award of Contract and at least thirty (30) days prior to installation, Contractor shall submit shop drawings or manufacturer’s cut sheets to the Agency in triplicate. One (1) set will be returned to the Contractor.

1.3 SUBSTITUTIONS
A. No substitution for Site Furniture and Amenities will be considered which is based on material delivery schedules, fabrication by Contractor, manufacturer carrying less than $1,000,000 product liability insurance or wood members of a different species, quality, or dimension.

1.4 REPAIR AND REPLACEMENT
A. A. Method of repair to damaged finished surfaces shall be as approved by the Agency and shall match the original finish.

B. B. Costs incurred for repair or replacement of defective or damaged work, rejected materials or workmanship shall be the responsibility of the Contractor.

PART 2 - PRODUCTS

2.1 Basis of design products shall be provided per drawings:

A. Waste Receptacle
B. Pebble Seat
C. Bike Rack
D. Tree Grate
E. Water Scupper
TS-132

Page 249 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 SITE FURNITURE AND AMENITIES 329320 - 2
F. Skatestopper
PART 3 - EXECUTION

3.1 INSTALLATION
A. Contractor shall install all Site Furniture and Amenities in accordance with the manufacturer’s recommendations for each item of work and as indicated on the drawings and specified herein.

B. Staked locations for Site Furniture and Amenities shall be approved by the Agency prior to digging for footings or installation.

C. Metal components, connections and fastenings shall be free of any burrs or sharp points and edges.

END OF SECTION 329320
TS-133

Page 250 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 1
Copyright 2011 by The American Institute of Architects (AIA) SECTION 329600 - TRANSPLANTING
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes transplanting non-nursery-grown trees by tree spade.

1.2 DEFINITIONS
A. General: See definitions in ANSI A300 (Part 6) and in ANSI Z60.1 pertaining to field-grown trees, except as otherwise defined in this Section.

B. Caliper: Diameter of a trunk as noted in Section 015639 Temporary Tree and Plant Protection.

C. Root-Ball Depth: Measured from bottom of trunk flare to the bottom of root ball.

1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at City Hall.

1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Pruning Schedule: Written schedule prepared by arborist detailing scope and extent of pruning each tree in preparation for and subsequent to transplanting.

1.5 INFORMATIONAL SUBMITTALS
A. Certification: From arborist, certifying that transplanted trees have been protected during construction and that trees were promptly and properly treated and repaired when damaged.

B. Maintenance Recommendations: From arborist, recommended procedures to be established by Owner for care and protection of trees after completing the Work.

C. Existing Conditions: Documentation of existing trees indicated to be transplanted, which establishes preconstruction conditions that might be misconstrued as damage caused by construction activities.

D. Tree-maintenance reports.

TS-134

Page 251 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 2

1.6 QUALITY ASSURANCE
A. Tree-Service Firm Qualifications: An experienced landscaping contractor or tree-moving firm that has successfully completed transplanting work similar to that required for this Project and that will assign an experienced, qualified arborist to Project site during execution of the Work.

1. Arborist Qualifications: Certified Arborist as certified by ISA, licensed arborist in jurisdiction where Project is located, current member of ASCA, or registered Consulting Arborist as designated by ASCA.

1.7 DELIVERY, STORAGE, AND HANDLING
A. Protect bark, branches, and root systems from sun scald, drying, wind burn, sweating, whipping, and other handling and tying damage. Do not bend or bind-tie trees in such a manner as to destroy their natural shape.

B. Completely cover foliage when transporting trees while they are in foliage.

C. Handle trees by root ball. Do not drop trees.

D. Contractor, prior to any work within the park, shall meet with the Owner’s representatives to flag and number all the trees within the park. Each tree shall be assigned an unique number and Owner’s Representative to confirm disposition (removal, relocation, or protect in place) of tree prior to any Contractor activity related to the trees. The trees marked for relocation shall be included on a plan sheet showing the existing and proposed locations for each tree. Trees marked for relocation shall be boxed, as noted herein, and moved on-site to area designated by the engineer and arborist.

E. Move trees after preparations for planting have been completed, and install immediately. If planting is delayed more than six hours after moving, set trees in their appropriate aspect (sun, filtered sun, or shade), protect from weather and mechanical damage, and keep roots moist.

1.8 FIELD CONDITIONS
A. Field Measurements: Verify final grade elevations and final locations of trees and construction contiguous with trees by field measurements before proceeding with transplanting work.

Perform transplanting only after finish grades are established.

B. Seasonal Restrictions: To be determined at time of award of contract.

1.9 MAINTENANCE SERVICE
A. Initial Maintenance Service: Provide tree maintenance by skilled employees of tree-service firm and as required in Part 3. Begin maintenance immediately after preparatory pruning and continue until plantings are healthy and well established but for not less than maintenance period below.

1. Maintenance Period: 12 months from date determined at award of contract.

TS-135

Page 252 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 3
PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. General Performance: Transplanted trees shall be healthy and resume vigorous growth within one year of transplanting without dieback due to defective extracting, handling, planting, maintenance, or other defects in the Work.

2.2 PLANTING MATERIALS
A. Backfill Soil: Excavated soil mixed with planting soil, as noted in Section 329113 “Soil Preparation”, of suitable moisture content and granular texture for placing and compacting in planting pit around tree, and free of stones, roots, plants, sod, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster, building debris, and other extraneous materials harmful to plant growth.

1. Mixture: Well-blended mix of planting soil as noted in Section 329113 “Soil Preparation”.

2. Planting Soil: Planting soil as specified in Section 329113 "Soil Preparation."

2.3 WATERING DEVICES
A. Watering Pipe: Refer to Irrigation Plans for irrigation system for trees.

B. Slow-Release Watering Device: Refer to Irrigation Plans for irrigation system for trees.

2.4 MISCELLANEOUS PRODUCTS
A. Retain "Organic Mulch" or "Mineral Mulch" Paragraph below if required and mulch type is not indicated on Drawings; revise to suit Project.

B. Organic Mulch: Ground or shredded bark as specified in Section 329300 "Plants." C. Antidesiccant: Water-insoluble emulsion, permeable moisture retarder, film forming, for trees.

Deliver in original, sealed, and fully labeled containers and mix according to manufacturer's written instructions.

D. Burlap: Non-synthetic, biodegradable.

E. Pesticides: Pesticide registered and approved by EPA, acceptable to authorities having jurisdiction, and of type recommended in writing by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction.

F. Planting Tablets: Tightly compressed chip type, long-lasting, slow-release, commercial-grade planting fertilizer in tablet form. Tablets shall break down with soil bacteria, converting nutrients into a form that can be absorbed by plant roots.

TS-136

Page 253 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 4

1. Size: As noted in Section 329113 “Soil Preparation” and Appendix: Landscape Soil Sampling and Testing.

2. Nutrient Composition: 20 percent nitrogen, 10 percent phosphorous, and 5 percent potassium, by weight plus micronutrients.

G. Weed-Control Barriers:

1. Nonwoven Geotextile As noted in Section 329300 “Plants”

2. Composite Fabric: As noted in Section 329300 “Plants” PART 3 - EXECUTION

3.1 PREPARATION
A. Utility Locator Service: Notify utility locator service for area where Project is located before beginning excavation.

B. Lay out individual transplant locations and areas for multiple plantings, and obtain Architect's acceptance of layout before transplanting.

C. Apply antidesiccant to trees uniformly, using power spray to provide an adequate film over trunks (before wrapping), branches, stems, twigs, and foliage to protect during extracting, handling, and transportation.

1. If deciduous trees are moved in full leaf, spray with antidesiccant before extracting and again two weeks after transplanting.

D. Wrap trees with burlap fabric over trunks, branches, stems, twigs, and foliage to protect from wind and other damage during extracting, handling, and transporting.

3.2 PREPARATORY PRUNING
A. Root Pruning: Perform preparatory root pruning under direction of arborist as far in advance of extracting each tree as the Project Schedule allows.

B. Crown Pruning (Tip Pruning):

1. Do not perform preparatory crown pruning (tip pruning).

2. Perform preparatory crown pruning as directed by arborist. Follow procedures as specified in "Crown Pruning" Article.

3.3 EXCAVATING PLANTING PITS
A. General: Excavate under supervision of the arborist. Keep excavations covered or otherwise protected until replanting trees.

B. Subsoil and topsoil removed from excavations may be used as planting soil.

TS-137

Page 254 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 5
C. Obstructions: Notify Engineer if unexpected rock or obstructions detrimental to trees are encountered in excavations.

D. Seepage: Notify Engineer if subsoil conditions evidence unexpected water seepage into treeplanting pits.

3.4 EXTRACTING TREES
A. General: Extract trees under supervision of the arborist.

B. Orientation Marking: Mark the north side of each tree with non-permanent paint before extracting.

C. Root-Ball Width: Minimum 10 inches of root-ball diameter, or least dimension for non-round root balls, for each inch of tree caliper being transplanted, or as directed by the arborist.

1. Out-of-Season Planting: If planting before or after the in-season period for tree, provide a minimum root-ball diameter of 12 inches for each inch of tree caliper being transplanted, or as directed by the arborist.

D. Root-Ball Depth: As determined by the arborist for each species and size of tree and for site conditions at original and planting locations.

E. Digging:

1. Dig and clear a pit with tree spade to the depth of the root system.

2. Cut exposed roots manually with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not paint or apply sealants on cut root ends.

3. Cover roots with burlap and keep them moist until planted.

F. Extracting with Tree Spade: Use the same tree spade to extract the tree as will be used to transport and plant the tree.

3.5 PLANTING
A. Planting Standard: Perform planting according to ANSI A300 (Part 6) unless otherwise indicated.

B. Before planting, verify that root flare is visible at top of root ball. If root flare is not visible, remove soil in a level manner from the root ball to where the top-most root emerges from the trunk. After soil removal to expose the root flare, verify that root ball still meets size requirements.

C. Ensure that root flare is visible after planting.

D. Remove injured roots by cutting cleanly; do not break. Do not paint or apply sealants on cut root ends.

TS-138

Page 255 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 6
E. Orientation: Position the tree so that its north side, marked before extracting, is facing north in its new location.

F. Set tree plumb and in center of planting pit as designated by Arborist.

1. Use specified backfill soil for backfill.

2. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets. When planting pit is approximately one-half filled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed.

3. Redirect exposed root ends downward in backfill areas where possible. Hand-expose roots as required to bend and redirect them without breaking.

4. Place planting tablets in each planting pit when pit is approximately one-half filled; in amounts recommended by arborist. Place tablets beside the root ball about 1 inch from root tips; do not place tablets in bottom of the hole.

5. Continue backfilling process. Water again after placing and tamping final layer of soil.

G. Watering Pipe: During backfilling, install watering pipe as indicated on drawings and as designated by Arborist.

H. Planting with Tree Spade: Use the same tree spade for planting as was used to extract and transport the tree.

I. Slopes: When planting on slopes, set the tree so the root flare on the uphill side is flush with the surrounding soil on the slope; the edge of the root ball on the downhill side will be above the surrounding soil. Apply enough soil to cover the downhill side of the root ball.

3.6 CROWN PRUNING
A. Prune branches as directed by the arborist.

1. Prune to remove only injured, broken, dying, or dead branches. Do not prune for shape.

2. Do not remove or reduce living branches to compensate for root loss caused by cutting root system or to improve natural tree form.

3. Pruning Standards: Perform pruning according to ANSI A300 (Part 1).

3.7 TREE STABILIZATION
A. Stabilize tree as indicated on drawings and as directed by the arborist.

3.8 MULCHING
A. Install weed-control barriers before mulching as noted in Section 329300 “Plants”.

B. Organic Mulch: Apply as noted in Section 329300 “Plants”.

TS-139

Page 256 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 7

3.9 INSTALLING SLOW-RELEASE WATERING DEVICE
A. Provide device for each tree as indicated on drawings..

B. Place device at base of tree as indicated on drawings.

3.10 TREE MAINTENANCE
A. Perform tree maintenance as recommended by arborist. Maintain arborist observation of transplanting work.

B. Maintain trees by pruning, cultivating, watering, weeding, fertilizing, mulching, restoring planting saucers, adjusting and repairing tree-stabilization devices, resetting to proper grades or vertical position, and performing other operations as required to establish healthy, viable plantings and as directed by Arborist. Treat as required to keep trees free of insects and disease.

C. From time of preparatory root pruning measure soil moisture adjacent to edge of each root ball weekly. Record findings and weather conditions.

D. Fill areas of soil subsidence with backfill soil. Replenish mulch materials damaged or lost in areas of subsidence.

E. Apply treatments as required to keep tree materials, planted areas, and soils free of pests and pathogens or disease. Use integrated pest management practices whenever possible to minimize the use of pesticides and reduce hazards. Treatments include physical controls such as hosing off foliage, mechanical controls such as traps, and biological control agents.

F. Pesticide Application: Apply pesticides and other chemical products and biological control agents in accordance with authorities having jurisdiction and manufacturer's written instructions. Coordinate applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed.

G. Reports: Have arborist prepare weekly inspection reports.

3.11 REPAIR AND REPLACEMENT
A. General: Repair or replace transplanted trees and other plants indicated to remain or be relocated that are damaged by construction operations, in a manner recommended and approved by the arborist.

1. Submit details of proposed pruning and repairs.

2. Perform repairs of damaged trunks, branches, and roots within 24 hours according to arborist's written instructions.

3. Replace trees and other plants that cannot be repaired and restored to full-growth status, as determined by the arborist.

B. Remove and replace trees that are more than 25 percent dead or in an unhealthy condition before the end of the corrections period or are damaged during construction operations that arborist determines are incapable of restoring to normal growth pattern.

TS-140

Page 257 of 564 ends

Parking Lot ‘D’
City of Hermosa Beach, CA November 2018, Revised June 2021 TRANSPLANTING 329600 - 8

1. Provide new trees of same size and species as those being replaced at no additional cost to City/Owner.

3.12 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Except for materials indicated to be recycled, remove surplus soil, excess excavated material, waste materials, displaced plants, trash, and debris, and legally dispose of them off Owner's property.

END OF SECTION 329600
TS-141

Page 258 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PART V

ELECTRICAL SPECIFICATIONS
TS-142

Page 259 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 1
SECTION 111200 – PARKING CONTROL EQUIPMENT
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Multi-Space Pay Stations.

1.3 DEFINITIONS
A. NFC: Near-Field Communication.

1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for equipment.

2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Shop Drawings.

1. Include plans, elevations, sections, and mounting details.

2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Detail fabrication and assembly of mounting assemblies for pay station equipment.

4. Include diagrams for power, signal, and control wiring.

5. Include verification of wireless communications service at each location of Equipment.

1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.

B. Seismic Qualification Data: Certificates, accessories, and components, from manufacturer.

C. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

TS-143

Page 260 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 2
D. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

E. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

F. Field quality-control reports.

G. Sample Warranty: For manufacturer's warranty.

1.6 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For Equipment to include in operation and maintenance manuals.

B. Software and Firmware Operational Documentation:

1. Software operating manuals.

2. Program Software Backup: On USB, CD, Cloud, or approved media, complete with configuration files.

3. Device address and password list.

4. Printout of software application and graphic screens.

1.7 QUALITY ASSURANCE
A. Source Limitations: Obtain each product through one source from a single manufacturer.

B. Comply with UL 1703 and UL 1741. Furnish products listed and classified by Underwriter's Laboratories Inc. as suitable for purpose specified and shown.

C. Manufacturer shall have a minimum of ten (10) years of experience in the production of Equipment specified and shall have ISO 9001 certification.

1.8 WARRANTY
A. Manufacturer's Warranty: Manufacturer and Installer agree to repair or replace Equipment components that fail(s) in materials or workmanship within specified warranty period.

1. Warranty Period: Five year(s) from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PARKING CONTROL EQUIPMENT
A. Basis of Design Product: Subject to compliance with requirements, provide product indicated on the drawings or comparable by one of the following manufacturers:

1. IPS Group Inc.

2. TAPCO – Traffic and Parking Control Company, Inc.

3. T2 Systems
TS-144

Page 261 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 3

2.2 PERFORMANCE REQUIREMENTS
A. Seismic Performance: EVSE shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1. The term "withstand" means "the unit will remain in place without separation of any parts when subjected to the seismic forces specified and the unit will be fully operational after the seismic event."

2. Component Importance Factor: 1.0.

B. Ambient Temperature: 41 to 110 deg F.

C. Relative Humidity: Zero to 95 percent.

D. Altitude: Sea level to 1000 feet.

E. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

2.3 MULTI-SPACE PAY STATIONS
A. Description:

B. Comply with ADA-ABA Accessibility Guidelines.

C. Metering: Revenue grade meter.

D. Control Power: 20 A, 110/120-V ac, 60 Hz, single phase with solar back-up.

E. Mounting: Floor mounted.

F. Enclosures:

1. Rated for environmental conditions at installed location. a. Outdoor Locations: NEMA 250, Type 3R.
b. Lockable.
c. Tamper resistant.

G. Status Indicators:

1. LEDs to indicate power, system status, faults, and service.

H. Display Screen:

1. Daylight viewable, UV-protected display with human-machine interface capability.

2. Displays power, system status, faults, and service.

I. Networking:

1. WAN Communications: Cellular GSM/GPRS or CDMA.

2. Capable of remote configuration and reporting.

J. Payment System:

TS-145

Page 262 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 4

1. Credit card capable.

2. NFC reader.

3. PCI compliant.

4. Capable of remote control and authorization.

2.4 GENERAL FINISH REQUIREMENTS
A. Protect mechanical finishes on exposed surfaces from damage by utilizing cushioning materials or foam or by applying a strippable, temporary protective covering before shipping.

B. Appearance of Finished Work: Noticeable variations in same piece are unacceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine roughing-in for electrical conduit to verify actual locations of conduit connections before equipment installation.

C. Examine pavement for suitable conditions where Equipment will be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Comply with NECA 1 and NECA 413.

B. Concrete Base Mounting:

1. Install Equipment on 6-inch (150-mm) nominal-thickness concrete base. Comply with requirements for concrete base specified in Section 033000 "Cast-in-Place Concrete." a. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of concrete base.
b. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete floor. c. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. d. Install anchor bolts to elevations required for proper attachment to supported equipment.
e. Secure Equipment to concrete base according to manufacturer's written instructions.

C. Wiring Method: Conceal conductors and cables below grade where possible.

TS-146

Page 263 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 5
D. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools.

E. Temporary Lifting Provisions: Remove temporary lifting eyes, channels, and brackets and temporary blocking from enclosures and components.

F. Secure covers to enclosure.

G. Cybersecurity:

1. Software:
a. Coordinate security requirements with Owner’s IT department. b. Ensure that latest stable software release is installed and properly operating. c. Disable or change default passwords to password of at least eight characters in length, using a combination of uppercase and lower letters, numbers, and symbols. Record passwords and turn over to party responsible for system operation and administration.

2. Hardware:
a. Coordinate location and access requirements with IT department. b. Enable highest level of wireless encryption that is compatible with Owner's ICT network.
c. Disable dual network connections.

3.3 CONNECTIONS
A. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
B. Comply with grounding requirements in Section 260526 "Grounding and Bonding for Electrical Systems."
C. Comply with requirements for installation of conduit in Section 260533 "Raceways and Boxes for Electrical Systems." Drawings indicate general arrangement of conduit, fittings, and specialties.

D. Tighten electrical connectors and terminals according to manufacturer's published torquetightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B.

E. Verify that all electrical connections have been made according to the manufacturer's instructions. Remove all burrs, shavings, and detritus from inside the enclosure.

F. After confirming all connections, install covers and tighten fasteners to according to manufacturer's instructions.

3.4 IDENTIFICATION
A. Comply with Section 260553 "Identification for Electrical Systems." TS-147

Page 264 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 6
B. Identify Equipment with panelboard identification and circuit number. Use hot, stamped, or engraved machine printing with white-filled lettering, and durable wire markers or tags inside wiring enclosure.

3.5 FIELD QUALITY CONTROL
A. Perform the following tests and inspections with the assistance of a factory-authorized service representative:

1. Visual Inspection: Prior to startup, examine installation for the following:
a. All equipment shall be mechanically secured and provided with adequate ventilation.
b. All electrical terminations and connections shall be made using approved products and installation methods.
c. All electrical equipment shall be marked with the manufacturer’s identification and applicable specifications and ratings.
d. Sufficient working spaces shall be provided about any electrical equipment that is likely to be serviced or maintained while energized.

2. For each piece of Equipment, perform the following tests and inspections:
a. Unit self-test.
b. Unit operation.
c. Network communications test.

B. Equipment will be considered defective if they do not pass tests and inspections.

C. Prepare test and inspection reports. Submit reports within two (2) weeks of completion of tests.

3.6 STARTUP SERVICE
A. Engage a factory-authorized service representative to perform startup service.

B. Complete installation and startup checks according to manufacturer's written instructions.

3.7 SOFTWARE SERVICE AGREEMENT
A. Technical Support: Beginning at Substantial Completion, service agreement shall include software support for four years.

B. Upgrade Service: At Substantial Completion, update software to latest version. Install and program software upgrades that become available within four years from date of Substantial Completion. Upgrading software shall include operating system and new or revised licenses for using software.

C. Upgrade Notice: At least 30 days to allow Owner to schedule and access the system and to upgrade computer equipment if necessary.

TS-148

Page 265 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
PARKING CONTROL EQUIPMENT 111200 - 7

3.8 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain Equipment.

END OF SECTION 111200
TS-149

Page 266 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 1
SECTION 260000 – GENERAL ELECTRICAL REQUIREMENTS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SCOPE
A. Basic electrical requirements specifically applicable to Division 26 Sections.

B. Work includes but is not necessarily limited to the following:

1. Labor, materials, services, equipment, and appliances required for completion of tasks as indicated on drawing or in specification or as inherently necessary to provide complete and operational electrical systems including:
a. All temporary construction power including test power, temporary heat and lighting; b. Incidental items not indicated on the drawings nor mentioned in the Specifications that belong to the work described, or are required to provide complete and operable systems, as though called out here in every detail;
c. Cleaning, cutting, patching, repairing and painting; d. Testing and commissioning;
e. The Contractor shall coordinate this Section with all other Sections of the Specification.

1.3 DRAWINGS AND SPECIFICATIONS
A. Drawings accompanying these Specifications show intent of Work to be done. Specifications shall identify quality and grade of installation and where equipment and hardware is not particularly specified, Contractor shall provide submittals for all products and install them per manufacturers’ recommendations, and in a workmanlike manner.

B. Examine Drawings and Specifications for elements in connection with this Work; determine existing and new general construction conditions and be familiar with all limitations caused by such conditions.

C. In the event of a conflict or inconsistency between items indicated on the plans and/or specifications or with code requirements, the note, specification or code which prescribes and establishes the more complete job or the higher standard prevail.

D. Plans are intended to show general arrangement and extent of Work contemplated. Exact location and arrangement of parts shall be determined after the Owner has reviewed equipment, as Work progresses, to conform in best possible manner with surroundings, and as directed by the Owner’s Representative.

E. For purposes of clearness and legibility, the electrical drawings are essentially diagrammatic. The size and location of equipment is shown to scale where possible. The contractor shall verify all TS-150

Page 267 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 2
conditions, data information as indicated on the drawings and in the specification sections where electrical work interfaces with other trades.

F. Contract Documents are intended to show the scope and general arrangement of the Work under this Contract. Drawings are not intended to be scaled for roughing in measurements or to serve as shop drawings. Where job conditions require minor changes or adjustments in the indicated locations or arrangement of the Work, such changes shall be made without change in the Contract amount.

G. The contractor shall maintain as built drawings to reflect all changes made during construction and any deviations from the electrical drawings. This includes deviations from circuit numbers and any addition, deletion or relocation of fixtures/outlets shown on working drawings.

1.4 UTILITIES
A. Location and sizes of electrical, mechanical and plumbing service facilities are shown in accordance with data secured from existing record drawings and site observations. Data shown are offered as an estimating guide without guarantee of accuracy. Check and verify all data given, and verify exact location of all utility services pertaining to Work prior to excavation or performing Work.

1.5 APPLICABLE REFERENCE STANDARDS, CODES AND REGULATIONS A. Meet requirements of all state codes having jurisdiction.

B. State of California Code of Regulations:

1. Title 8, Chapter 4. Division of Industrial Safety, Subchapter 5. Electrical Safety Orders (Cal/OSHA):
a. Low-Voltage Electrical Safety Orders (Sections 2299 - 2599) b. High-Voltage Electrical Safety Orders (Sections 2700 - 2989)

2. Title 19, State Fire Marshal Regulations

3. Current California Building Code (CBC), Title 24, Part 2

4. Current California Electrical Code, Title 24, Part 3

5. Current California Mechanical Code, Title 24, Part 4

6. Current California Plumbing Code, Title 24, Part 5

7. Current California Energy Code, Title 24, Part 6

8. Current California Fire Code, Title 24, Part 9

9. Current California Standards Code, Title 24, Part 12 C. Additional Referenced Standards:

1. ANSI American National Standards Institute

2. IEEE Institute of Electrical and Electronic Engineers

3. NEMA National Electrical Manufacturer’s Association

4. NFPA National Fire Protection Association Standards

5. UL Underwriters Laboratories
D. Codes and ordinances having jurisdiction over Work are minimum requirements; but, if Contract Documents indicate requirements, which are in excess of those minimum requirements, then requirements of the Contract Documents shall be followed. Nothing in these drawings and TS-151

Page 268 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 3
specifications shall be construed to permit work not conforming to governing codes or regulations.

Should there be any conflicts between Contract Documents or codes or any ordinances having jurisdiction, report these to the Owner’s Representative.

E. Obtain permits, and request inspections from authority having jurisdiction.

1.6 PROJECT AND SITE CONDITIONS
A. The arrangement of and connection to equipment shown on the Drawings is based upon information available and is not intended to show exact dimensions peculiar to a specific manufacturer. The Drawings are, in part, diagrammatic and some features of the illustrated equipment installations may require revision to meet actual equipment installation requirements.

Structural supports, housekeeping pads, piping connections and adjacent equipment may have to be altered to accommodate the equipment provided. No additional payment will be made for such revisions or alterations.

B. Examine all Drawings and Specifications to be fully cognizant of all work required under this Division.

C. Examine site related work and surfaces before starting work of any Section.

D. Install Work in locations shown on approved Drawings, unless prevented by Project conditions.

E. Prepare drawings showing proposed rearrangement of Work to meet Project conditions, including changes to Work specified in other Sections. Obtain permission from the Owner’s Representative before proceeding.

1.7 COOPERATION WITH WORK UNDER OTHER DIVISIONS
A. Cooperate with other trades to facilitate general progress of Work. Allow all other trades every reasonable opportunity for installation of their work.

B. Work under this Division shall follow general building construction closely. Set pipe sleeves and inserts and verify that openings for chases and pipes are provided.

C. Work with other trades in determining exact location of outlets, conduits, pipes, and pieces of equipment to avoid interference with lines required to maintain proper installation of Work.

D. Make such progress in the Work to not delay work of other trades.

1.8 DISCREPANCIES
A. The contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the owner of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements. Large scale drawings in general govern small scale drawings. The contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby. Where no figures or notations are given, the plans shall be followed B. Omissions from the Drawings or Specifications or the erroneous description of details of work which are manifestly necessary to carry out the intent of the Drawings and Specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or TS-152

Page 269 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 4
erroneously described details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.

C. If any part of the Specifications or Drawings appears unclear or contradictory, apply to Owner’s Representative for interpretation and decision as early as possible, including during bidding period. Do not proceed with such work without Owner Representatives decision. Beginning work of any Section constitutes acceptance of conditions.

1.9 CHANGES
A. The Contractor shall be responsible to make and obtain approval from the Owner’s Representative for all necessary adjustments in piping and equipment layouts as required to accommodate the relocations of equipment and/or devices, which are affected by any approved authorized changes or Product substitutions. All changes shall be clearly indicated on the "Record" drawings.

1.10 SUBMITTALS
A. Refer to Division 01 for additional requirements.

B. The manufacturer, contractor or supplier shall include a written statement that the submitted equipment, hardware or accessory complies with the requirement of that particular specification section.

C. The manufacturer shall resubmit the specification section showing compliance with each respective paragraphs and specified items and features in that particular specification section.

D. All exceptions shall be clearly identified by referencing respective paragraph and other requirements along with proposed alternative.

E. Note that prior to acceptance of submittals for review, a submittal schedule shall be submitted to the Owner’s Representative.

F. Submit all Division 26 shop drawings and product data grouped and referenced by the specification technical section number in one complete submittal package.

G. Shop Drawings:

1. Include installation details of equipment indicating proposed location, layout and arrangement, accessories, piping, and other items that must be shown to assure a coordinated installation.

2. Indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices.

3. If equipment is rejected, revise drawings to show acceptable equipment and resubmit.

4. Whenever more than one (1) manufacturer’s product is specified, the first named product is the basis of design used in the Drawings and the use of alternate-named manufacturer’s products or substitutes may require modifications to the design.

5. The Contractor shall be responsible for all equipment ordered and/or installed prior to receipt of shop drawings returned from the Owner’s Representative bearing the Owner's Representative stamp of "Reviewed". All corrections or modifications to the equipment as noted on the shop drawings shall be performed and equipment removed from the job site at the request of the Owner’s Representative without additional compensation.

TS-153

Page 270 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 5

6. Manufacturer's Data: For each manufactured item, provide current manufacturer's descriptive literature of cataloged products, certified equipment drawings, diagrams, performance and characteristic curves if applicable, and catalog cuts.

7. Standard Compliance: When materials or equipment provided by the Contractor must conform to the standards of organizations such as American National Standards Institute (ANSI) or UL, submit proof of such conformance to the Owner Representative for approval.

If an organization uses a label or listing to indicate compliance with a particular standard, the label or listing will be acceptable evidence, unless otherwise specified. In lieu of the label or listing, submit a certificate from an independent testing organization, which is competent to perform acceptance testing and is approved by the Owner Representative.

The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item conforms to the specified organization's standard.

8. Certified Test Reports: Before delivery of materials and equipment, certified copies of all test reports specified in individual sections shall be submitted for approval.

9. Certificates of Compliance or Conformance: Submit manufacturer's certifications as required on products, materials, finish, and equipment indicated in the technical sections.

Certifications shall be documents prepared specifically for this Contract. Pre-printed certifications and copies of previously submitted documents will not be acceptable. The manufacturer's certifications shall name the appropriate products, equipment, or materials and the publication specified as controlling the quality of that item. Certification shall not contain statements to imply that the item does not meet requirements specified, such as "as good as"; or "achieve the same end use and results as materials formulated in accordance with the referenced publications"; or "equal or exceed the service and performance of the specified material." Certifications shall simply state that the item conforms to the requirements specified. Certificates shall be printed on the manufacturer's letterhead and shall be signed by the manufacturer's official authorized to sign certificates of compliance or conformance.

H. The Contractor shall submit all passcodes and passwords for any hardware and software required for the operations and troubleshooting in all systems and components no less than fourteen (14) calendar days prior to Final Completion.

1.11 PROJECT RECORD DOCUMENTS
A. Refer to Division 01 for additional requirements.

1. All changes, deviations and information recorded on the “Project Record Drawings” set during Construction shall be redrafted using the latest version of AutoCAD or Revit, where applicable.

2. Submit completed shop drawings to the Owner prior to completion in digital format.

3. Contractor hand-marked or drafted redlined “Project Record Drawings” will not be accepted.

1.12 PRODUCT ALTERNATIVES OR SUBSTITUTIONS
A. Refer to General Conditions and Division 01 for additional requirements.

1.13 OPERATING INSTRUCTIONS
A. Furnish approved operating instructions for systems and equipment indicated in the technical sections for use by operation and maintenance personnel.

TS-154

Page 271 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 6

1.14 MANUFACTURER'S RECOMMENDATIONS
A. Where installation procedures or any part thereof are required to be in accordance with manufacturer's recommendations, furnish printed copies of the recommendations prior to installation. Installation of the item shall not proceed until recommendations are received. Failure to furnish recommendations shall be cause for rejection of the equipment or material.

1.15 DELIVERY AND STORAGE
A. Refer to Division 01 for additional requirements.

B. Handle, store, and protect equipment and materials in accordance with the manufacturer's recommendations and with the requirements of NFPA 70B P, Appendix I, titled "Equipment Storage and Maintenance During Construction." Replace damaged or defective items with new items.

1.16 GUARANTEE
A. Except as may be specified under other sections in the Specifications, guarantee all equipment furnished under the Specifications for a period of one year from date of project acceptance against defective workmanship and material and improper installation. Upon notification of failure, correct deficiency immediately and without cost to the Owner.

B. Standard warranty of manufacturer shall apply for replacement of parts after expiration of the above period. Manufacturer shall furnish replacement parts to the Owner for their service agency as directed.

PART 2 - PRODUCTS

2.1 COMPETITIVE PRODUCTS
A. Unless otherwise noted, any reference in the Specification to any article, device, product, material, fixture, form, or type of construction by name, make, or catalog number shall be interpreted as establishing a standard of quality and shall not be construed as limiting competition.

The Contractor may at his option propose substitutions for such material in accordance with the substitution procedure outlined in the Contract Documents.

2.2 MATERIALS
A. Provide all new materials and equipment, free from any defects, in first-class condition, and suitable for the space provided. Provide materials and equipment approved by UL authority having jurisdiction approved testing agency, wherever standards have been established by that agency.

B. Where two or more units of the same class of material or equipment are required, provide products of a single manufacturer. Component parts of units or equipment need not be products of the same manufacturer.

TS-155

Page 272 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 7
C. Unless otherwise indicated, provide materials and equipment which are the standard products of manufacturers regularly engaged in the production of such materials and equipment. Provide the manufacturers' latest standard design that conforms to these Specifications.

D. Provide materials and equipment with manufacturers' standard finish system, except where otherwise specified. Provide manufacturers' standard finish color, except where specific color is indicated. If manufacturer has no standard color, finish equipment with ANSI Number 61, light gray color.

E. Environmental and Seismic Conditions: Material and Equipment shall be designed to insure satisfactory operation and operational life in the environmental and seismic conditions which will prevail where they are being installed. Electrical equipment and enclosures shall be designed, constructed and certified to withstand external loading conditions as prescribed by the California Building Code for the locations of the equipment. Supplied equipment shall either be shake table tested and certified or comprehensive seismic calculations shall be provided. All seismic calculations and structural drawings shall bear the seal of a Structural Professional Engineer currently licensed in the State of California.

PART 3 - EXECUTION

3.1 GENERAL
A. Obtain and pay for all permits and inspections, including any independent testing required to verify standard compliance, and deliver certificates for same to the Owner’s Representative.

3.2 WORK RESPONSIBILITIES
A. The drawings indicate diagrammatically the desired locations or arrangement of piping, equipment, etc., and are to be followed as closely as possible. Proper judgment must be exercised in executing the work to secure the best possible installation in the available space and to overcome local difficulties due to space limitations or interference with structural conditions.

B. The Contractor is responsible for the correct placing of Work and the proper location and connection of Work in relation to the work of other trades. Advise appropriate trade as to locations of access panels.

C. In the event changes in the indicated locations or arrangements are necessary, due to developed conditions in the construction or rearrangement of furnishings or equipment, such changes shall be made without extra cost, providing the change is ordered before the conduit runs, etc. and work directly connected to same is installed and no extra materials are required.

D. Where equipment is furnished by others, verify dimensions and the correct locations of this equipment before proceeding with the roughing-in of connections.

E. All scaled and figured dimensions are approximate of typical equipment of the class indicated.

Before proceeding with any work, carefully check and verify all dimensions, sizes, etc. with the drawings to see that the equipment will fit into the spaces provided without violation of applicable codes.

F. Should any changes to the Work indicated on the Drawings or described in the Specifications be necessary in order to comply with the above requirements, notify the Owner immediately and TS-156

Page 273 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GENERAL ELECTRICAL REQUIREMENTS 260000 - 8
cease work on all parts of the contract, which are affected until approval for any required modifications to the construction has been obtained from the Owner.

G. Be responsible for any cooperative work, which must be altered due to lack of proper supervision or failure to make proper provisions in time. Such changes shall be under direction of the Owner and shall be made to his satisfaction. Perform all Work with competent and skilled personnel.

H. The electrical drawings do not indicate all fittings, hardware, or appurtenances required for a complete operating installation.

I. Wiring diagrams are not intended to indicate the exact course of raceways.

J. One-line and riser diagrams are only schematics and do not show physical arrangements of equipment.

K. All workmanship, including aesthetic as well as electrical aspects of the Work, shall be of the highest quality consistent with the best practices of the trade.

L. Replace or repair, without additional compensation, any Work, which, in the opinion of the Owner, does not comply with these requirements.

3.3 CLEANING & PAINTING OF EQUIPMENT
A. Refer to Division 09 for additional requirements.

B. Factory Applied:

1. Electrical equipment shall have factory-applied painting systems, which shall, as a minimum, meet the requirements of NEMA ICS 6 corrosion-resistance test, except equipment specified to meet requirements of ANSI C37.20 shall have a finish as specified in ANSI C37.20.

2. Refer to individual sections of this Division for more stringent requirements.

C. Field Applied: Paint electrical equipment as required to touch up, to match finish on other equipment in adjacent spaces, or to meet safety criteria.

D. After installation, all metal finishes shall be polished and cleaned of all dirt, rust, cement, plaster, grease, and paint.

END OF SECTION 260000
TS-157

Page 274 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
LV ELECT. POWER CONDUCTORS & CABLES 260519 - 1
SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Building wires and cables rated 600 V and less.

2. Connectors, splices, and terminations rated 600 V and less.

3. Photovoltaic cable, Type PV, rated 2000 V or less.

B. Related Requirements:

1. Section 260533 “Raceways and Boxes for Electrical Systems"

2. Section 260553 "Identification for Electrical Systems."

1.3 DEFINITIONS
A. ASTM: American Society of Testing Materials.

B. ICEA: Insulated Cable Engineers Association.

C. IEEE: Institute of Electrical & Electronics Engineers.

D. NEMA: National Electrical Manufacturers Association.

E. NETA ATS: InterNational Electrical Testing Association - Acceptance Testing Specification.

F. PV: Photovoltaic.

1.4 ACTION SUBMITTALS
A. Product Data: Submit manufacturer’s technical data for each type of product, indicating conductor/cable construction, insulation material, thickness of insulation, jacket, cable stranding, and voltage rating of each type of conductor/cable specified, splices and terminations. Indicate date and place of manufacture for each conductor/cable, cable, splice and termination.

B. Manufacturer’s ISO certification.

C. Product Cable Schedule: Indicate type, use, location, and termination locations.

TS-158

Page 275 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
LV ELECT. POWER CONDUCTORS & CABLES 260519 - 2

1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Independent Testing Agency.

B. Field quality-control reports. Perform field testing of cables per para 3.8. Submit six (6) copies of field test reports to owner’s representative within two (2) weeks of completion of test.

1.6 QUALITY ASSURANCE
A. General Requirements: The low voltage power conductors and cable shall be copper, minimum 600V rated unless otherwise indicated. Aluminum conductors and cables shall not be accepted unless otherwise indicated.

B. Materials and installation shall meet or exceed requirements in the following referenced standards and shall be listed and labelled by UL.

1. ICEA S-95-658/ NEMA WC 70.

2. UL 1072.

3. IEEE.

4. ASTM.

5. NEMA.

C. Conductors and cables shall be of the same manufacturer and shipped to the job site in original unbroken reels.

D. Conductors and cables shall be manufactured with in twelve (12) months of installation. Date of manufacture shall be clearly marked on conductors or conductor reels.

E. Manufacturer shall have minimum ten (10) years experience in the manufacturer of conductors and cables similar to those specified on this project.

F. Manufacturer shall have ISO 9001 and ISO 9002 certification.

G. All conductors and cables shall be new and supplied by a local distributor.

H. If alternate manufacturer of products other than what are specified in this section are submitted, all necessary documents not limited to cut sheets, technical information, test reports from recognized testing labs and factory test reports shall be submitted to the satisfaction of the owner/engineer to ensure quality and conformance to the specifications. Additional testing shall be undertaken if it is concluded by the owner/engineer that the submitted test reports are either insufficient or do not include all tests necessary for product acceptance. The tests shall be conducted by a recognized lab acceptable to the owner/engineer and all tests shall be witnessed by owner’s/engineer’s personnel. All testing procedures and test results shall be satisfactory to the owner/engineer. Contractor shall be responsible for arranging the tests, for transportation, food and lodging for minimum of one owner’s/engineer’s representative to witness the test at the testing lab. Include all costs for the above in the bid.

I. Testing: Provide the services of an independent qualified testing laboratory to perform the specified field tests. Notify the University's Representative fourteen (14) days in advance of performance of work requiring testing.

J. Conductors, cables, splices and terminations shall be manufactured within twelve (12) months of installation. Each item shall have a permanent marking on the product or the original manufacturers’ package indicating the date of manufacture unless otherwise noted.

TS-159

Page 276 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
LV ELECT. POWER CONDUCTORS & CABLES 260519 - 3
K. Testing Agency Qualifications:

1. Testing agency shall be an independent company; shall have been a member of NETA for a minimum of last ten (10) years and has permanent in-house testing engineers and technicians involved with testing of low voltage electrical power conductors and cables similar to those specified on this project.

2. Testing company shall be located with 50 miles radius of the project.

3. Testing Agency's Field Supervisor: Certified by NETA to supervise on-site testing.

4. Field Testing technician and supervisor shall have minimum ten (10) years’ experience in field testing of low voltage power conductors and cables of the type and rating similar to the conductors and cables to be tested on this project.

PART 2 - PRODUCTS

2.1 CONDUCTORS AND CABLES
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following manufacturers:

1. General Cable Technologies Corporation.

2. Southwire Incorporated

3. Alpha Wire.

4. Belden Inc.

5. Encore Wire Corporation..

B. Conductor Material: Electrical grade, soft drawn annealed copper, 98 percent conductivity, and fabricated in accordance with ASTM and ICEA standards. Minimum size is number 12 for branch circuits, number 14 stranded for control wiring. Aluminum conductors are not permitted.

Copper Conductors: Comply with NEMA WC 70/ICEA S-95-658.

C. Conductor Insulation: Comply with NEMA WC 70/ICEA S-95-658 for Type XHHW-2.

D. Multiconductor Cable: Comply with NEMA WC 70/ICEA S-95-658 for Type SO with ground wire.

2.2 PHOTOVOLTAIC CABLE, TYPE PV
A. Description: Flexible, insulated and uninsulated, drawn copper current-carrying conductor with an overall insulation layer or jacket, or both, rated 2000 V.

B. Standards:

1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

2. RoHS compliant.

3. Conductor and Cable Marking: Comply with wire and cable marking according to UL's "Wire and Cable Marking and Application Guide."
C. Conductors: Copper, complying with ASTM B 3 for bare annealed copper and with ASTM B 8 for stranded conductors.

D. Conductor Insulation: Comply with UL 44 and UL 4703.

TS-160

Page 277 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
LV ELECT. POWER CONDUCTORS & CABLES 260519 - 4

2.3 CONNECTORS AND SPLICES
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following manufacturers:

1. Ideal Industries, Inc.

2. Ilsco

3. NSi Industries LLC.

4. O-Z/Gedney; a brand of Emerson Industrial Automation.

5. 3M; Electrical Markets Division.

6. TE Connectivity - Raychem.

B. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.

C. Copper conductors shall be terminated in copper or bronze mechanical connectors or lugs or tool applied compression connections made of copper for all connections except those on wiring devices.

D. Splices in wires No. 10 and smaller shall be made with twist-on splicing connector in accordance with UL486-C. Connections in wires No. 8 and larger shall be made with compression type connectors in accordance with UL486-A and wrapped with insulated tape in accordance with UL501. Insulating tape shall be applied in a minimum of two layers of half wrap or built to match the overall insulation of the wire.

E. Splices in underground pull boxes shall be made submersible type and made using “3M” Scotch-cast epoxy kits.

F. PV Circuits: Use MC4 connectors.

G. Pressure type connectors are not permitted.

2.4 SYSTEM DESCRIPTION
A. Electrical Components, Devices, and Accessories: UL Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with NFPA 70.

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS
A. Feeders: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

B. Branch Circuits: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

TS-161

Page 278 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
LV ELECT. POWER CONDUCTORS & CABLES 260519 - 5

3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND WIRING

METHODS
A. Service Entrance: Type XHHW-2, single conductors in raceway B. Branch Circuits Concealed in Concrete, below Slabs-on-Grade, and Underground:

Type XHHW-2, single conductors in raceway
C. PV Circuits: Type PV for PV source circuits rated at 1000 V.

3.3 INSTALLATION OF CONDUCTORS AND CABLES
A. All conductors and cables shall be installed in a raceway.

B. Before installing conductors and cables in existing conduits, verify the continuity of each conduit; each surface conduit is properly supported per code and clear of any debris.

C. Complete raceway installation between conductor and cable termination points according to Section 260533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables.

D. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

E. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.

F. Install exposed cables parallel and perpendicular to surfaces of exposed structural members and follow surface contours where possible.

3.4 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torquetightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B.

B. Make splices, terminations, and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors].

C. Wiring at Outlets: Install conductor at each outlet, with at least 12 inches of slack.

3.5 IDENTIFICATION
A. Each conductor shall be factory color coded by conductor manufacturer. Identify and color-code conductors and cables according to Section 260553 "Identification for Electrical Systems." B. Identify each spare conductor at each end with identity number and location of other end of conductor and identify as spare conductor.

TS-162

Page 279 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
LV ELECT. POWER CONDUCTORS & CABLES 260519 - 6

3.6 FIELD QUALITY CONTROL
A. Perform the following tests and inspections:

1. After installing conductors and cables and before electrical circuitry has been energized, test service entrance conductors, and feeder conductors for compliance with requirements.

2. Perform each visual and mechanical inspection and electrical tests stated in latest NETA Acceptance Testing Specification section 7.3.2 (Inspection and Test Procedures-Cables, Low Voltage-600V Maximum). Certify compliance with test parameters per NETA tables.

B. Test and Inspection Reports: Prepare a written report to record the following:

1. Procedures used.

2. Results that comply with requirements. Include color scan images.

3. Results that do not comply with requirements and corrective action taken to achieve compliance with requirements.

C. Cables will be considered defective if they do not pass tests and inspections.

END OF SECTION 260519
TS-163

Page 280 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GROUNDING & BONDING FOR ELECT. SYSTEMS 260526 - 1
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes: Grounding systems and equipment.

B. Section includes grounding systems and equipment, plus the following special applications:

1. Underground distribution grounding.

1.3 Definitions:

A. NETA ATS: InterNational Electrical Testing Association - Acceptance Testing Specification.

B. NETA MTS: InterNational Electrical Testing Association - Maintenance Testing Specification.

C. NFPA : National Fire Protection Association.

D. IEEE: Institute of Electrical and Electronics Engineers

1.4 ACTION SUBMITTALS
A. Product Data: Submit manufacturer’s technical catalog cuts for each type of product indicated.

B. Shop Drawings: Site drawings to scale including details showing location and size of each field connection of grounding system.

1. Wiring Diagrams: Differentiate between manufacturer installed and field installed wiring.

1.5 INFORMATIONAL SUBMITTALS
A. Informational Submittals: Plans drawn to scale (1/4”=1’-0”) showing dimensioned locations of grounding features specified in "Field Quality Control" Article, including the following:

1. Test wells.

2. Ground rods.

3. Ground rings.

4. Grounding conductors, connectors.

5. Grounding arrangements and connections for separately derived systems.

6. Grounding for sensitive electronic equipment.

TS-164

Page 281 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GROUNDING & BONDING FOR ELECT. SYSTEMS 260526 - 2
B. Field quality-control reports. Submit written test reports including the following:

1. Test procedures used.

2. Test results that comply with requirements.

3. Results of failed tests and corrective action taken to achieve test results that comply with requirements.

1.6 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For grounding to include operation, and maintenance manuals.

1. Instructions for periodic testing and inspection of grounding features at test wells based on NFPA 70B.
a. Tests shall determine if ground-resistance or impedance values remain within specified maximums, and instructions shall recommend corrective action if values do not.
b. Include recommended testing intervals.

1.7 QUALITY ASSURANCE
A. Testing Agency Qualifications:

1. Testing agency shall be an independent company; shall have been a member of NETA for a minimum of last ten (10) years and has permanent in-house testing engineers and technicians involved with testing of grounding systems similar to those specified on this project.

2. Testing company shall be located with 50 miles radius of the project.

3. Testing Agency's Field Supervisor: Currently certified by NETA to supervise on-site testing.

4. Field Testing technician and supervisor shall have minimum ten (10) years’ experience in field testing of rounding systems of the type and rating similar to the systems to be tested on this project.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. Comply with UL 467 for grounding and bonding materials and equipment.

PART 2 - PRODUCTS

2.1 GROUNDING ELECTRODES, CONDUCTORS, CONNECTOR, BUS:

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or equal:

1. Grounding Connectors, Bars and Rods:
a. Erico - Pentair Electrical Fastening Solutions
b. Burndy – A Hubbell Company.
c. Ideal Industries, Inc.
d. O-Z/Gedney Co. - A brand of Emerson Industrial Automation.

TS-165

Page 282 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GROUNDING & BONDING FOR ELECT. SYSTEMS 260526 - 3
e. Thomas & Betts - A Member of the ABB Group.

2. Grounding Conductors and cables:
a. Southwire
b. American Insulated Wire
c. Okonite

2.2 CONDUCTORS
A. Insulated Conductors: Copper wire or cable insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction.

B. Bare Copper Conductors:

1. Solid Conductors: ASTM B 3.

2. Stranded Conductors: ASTM B 8.

3. Tinned Conductors: ASTM B 33.

4. Bonding Cable: 28 kcmil, 14 strands of No. 17 AWG conductor, 1/4 inch (6 mm) in diameter.

5. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor.

6. Bonding Jumper: Copper tape, braided conductors terminated with copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.

7. Tinned Bonding Jumper: Tinned-copper tape, braided conductors terminated with copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.

2.3 CONNECTORS
A. Listed and labeled by UL for applications in which used and for specific types, sizes, and combinations of conductors and other items connected.

B. Bolted Connectors for Conductors, Rods and Pipes: Copper or copper alloy, pressure type with at least two bolts.

1. Pipe Connectors: Clamp type, sized for pipe.

C. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.

2.4 GROUNDING ELECTRODES
A. Ground Rods: Copper-clad steel; 3/4 inch by 10 feet.

PART 3 - EXECUTION

3.1 APPLICATIONS
A. Conductors: Install solid conductor for No. 8 AWG and smaller, and stranded conductors for No. 6 AWG and larger unless otherwise indicated.

TS-166

Page 283 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GROUNDING & BONDING FOR ELECT. SYSTEMS 260526 - 4
B. Conductor Terminations and Connections:

1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors.

2. Underground Connections: Welded connectors except at test wells and as otherwise indicated.

3. Connections to Ground Rods at Test Wells: Bolted connectors.

4. Connections to Structural Steel: Welded connectors.

3.2 EQUIPMENT GROUNDING
A. Install insulated equipment grounding conductors with all feeders and branch circuits in the same conduit containing phase and neutral conductors. Comply with NFPA 70, Article 250, for types, sizes, and quantities of equipment grounding conductors, unless specific types, larger sizes, or more conductors than required by NFPA 70 are indicated.

B. Install insulated equipment grounding conductors with the following items, in addition to those required by NFPA 70:

1. Feeders and branch circuits.

2. Lighting circuits.

3. Receptacle circuits.

4. Flexible raceway runs.

C. Metal Poles Supporting Outdoor Lighting Fixtures: Install grounding electrode next to the pole and a separate insulated equipment grounding conductor in addition to grounding conductor installed with branch-circuit conductors. Provide a handhole for the grounding electrode at each pole.

D. Metallic Fences or Other Metal Structures: Comply with requirements of IEEE C2. Bond metallic fences and other metal structures located within 8 feet (2.5 m) vertically or 16 feet (5 m) horizontally of exposed conductors or equipment.

1. Grounding Conductor: Bare, tinned-copper, not less than No. 8 AWG.

2. Gates: Shall be bonded to the gate support post with a flexible bonding jumper. Bond each gate support post to the grounding electrode system in the area.

3. Provide bond across fence openings with 2 AWG bonding jumper buried 18 inches (460 mm) minimum below finished grade. Extend local grounding electrode system to cover swing of gates.

4. Barbed Wire: Strands shall be bonded to the grounding conductor.

3.3 INSTALLATION
A. Grounding Conductors: Route along shortest and straightest paths possible unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage.

B. Ground Bonding Common with Lightning Protection System: Comply with NFPA 780 and UL 96 when interconnecting with lightning protection system. Bond electrical power system ground directly to lightning protection system grounding conductor at closest point to electrical service grounding electrode. Use bonding conductor sized same as system grounding electrode conductor and install in conduit.

TS-167

Page 284 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GROUNDING & BONDING FOR ELECT. SYSTEMS 260526 - 5
C. Ground Rods: Drive rods until tops are 2 inches (50 mm) below finished floor or final grade unless otherwise indicated.

1. Interconnect ground rods with grounding electrode conductor below grade using exothermic welds, except at test wells and as otherwise indicated. Make connections without exposing steel or damaging coating if any.

2. For grounding electrode system, install ground rods at least two rods (unless otherwise indicated on the drawings), spaced at least one-rod length from each other and located at least the same distance from other grounding electrodes, and connect to the service grounding electrode conductor.

D. Test Wells: Ground rod driven through drilled hole in bottom of handhole. Handholes are specified in Section 260543 "Underground Ducts and Raceways for Electrical Systems," and shall be at least 12 inches (300 mm) deep, with cover.

1. Test Wells: Install at least one test well for each service unless otherwise indicated.

Install at the ground rod electrically closest to service entrance. Set top of test well flush with finished grade or floor.

2. Test Wells near light poles: Coordinate location with landscape drawings and install one at each pole. Test well shall be open bottom and installed on a 12”H bed of gravel or crushed stone (1” size).

E. Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance except where routed through short lengths of conduit.

1. Bonding to Structure: Bond straps directly to basic structure, taking care not to penetrate any adjacent parts.

2. Bonding to Equipment Mounted on Vibration Isolation Hangers and Supports: Install bonding so vibration is not transmitted to rigidly mounted equipment.

3. Use exothermic-welded connectors for outdoor locations; if a disconnect-type connection is required, use a bolted clamp.

3.4 LABELING
A. Comply with requirements in Section 260553 "Identification for Electrical Systems" for instruction signs. The label or its text shall be green.

3.5 FIELD QUALITY CONTROL
A. Perform tests and inspections.

B. Tests and Inspections:

1. After installing grounding system but before permanent electrical circuits have been energized, test for compliance with requirements.

2. Inspect physical and mechanical condition. Verify tightness of accessible, bolted, electrical connections with a calibrated torque wrench according to manufacturer's written instructions.

3. Test completed grounding system at each location where a maximum ground-resistance level is specified, at service disconnect enclosure grounding terminal, at ground test wells and at individual ground rods. Make tests at ground rods before any conductors are connected.

TS-168

Page 285 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
GROUNDING & BONDING FOR ELECT. SYSTEMS 260526 - 6
a. Measure ground resistance no fewer than two full days after last trace of precipitation and without soil being moistened by any means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural ground resistance.
b. Perform tests by fall-of-potential method according to IEEE 81.

4. Prepare dimensioned Drawings locating each test well, ground rod and ground-rod assembly, and other grounding electrodes. Identify each by letter in alphabetical order, and key to the record of tests and observations. Include the number of rods driven and their depth at each location and include observations of weather and other phenomena that may affect test results. Describe measures taken to improve test results.

C. Grounding system will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

E. Report measured ground resistances that exceed the following values:

1. Power and Lighting Equipment or System with Capacity of 500 kVA and Less: 10 ohms.

F. Excessive Ground Resistance: If resistance to ground exceeds specified values, notify Architect promptly and include recommendations to reduce ground resistance.

END OF SECTION 260526
TS-169

Page 286 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 1
SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Metal conduits, tubing, and fittings.

2. Nonmetal conduits, tubing, and fittings.

3. Metal wireways and auxiliary gutters.

4. Nonmetal wireways and auxiliary gutters.

5. Surface raceways.

6. Boxes, enclosures, and cabinets.

7. Handholes and boxes for exterior underground cabling.

1.3 DEFINITIONS
A. EMT: Electrical metal tubing
B. GRC: Galvanized rigid steel conduit.

C. LFMC: Liquidtite flexible metal conduit.

D. RNC: Rigid nonmetallic conduit.

1.4 QUALITY ASSURANCE:

A. Each conduit shall bear manufacturer’s trademark and UL label.

B. Each type of conduit and fittings shall be of a single manufacturer. Multiple manufacturers of the same material are not acceptable.

C. Comply with California Electric Code (CEC)

1.5 ACTION SUBMITTALS
A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

TS-170

Page 287 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 2

1.6 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of items involved.

B. Seismic Qualification Certificates: For enclosures, cabinets, and conduit racks and their mounting provisions, including those for internal components, from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

4. Detailed description of conduit support devices and interconnections on which the certification is based and their installation requirements.

C. Source quality-control reports.

PART 2 - PRODUCTS

2.1 METAL CONDUITS, TUBING, AND FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Allied Tube & Conduit; a Tyco International Ltd. Co.

2. Electri-Flex Company.

3. O-Z/Gedney; a brand of EGS Electrical Group.

4. Republic Conduit.

5. Robroy Industries.

6. Thomas & Betts Corporation.

7. Western Tube and Conduit Corporation.

8. Wheatland Tube Company; a division of John Maneely Company.

B. Listing and Labeling: Metal conduits, tubing, and fittings shall be UL listed and labeled as defined in NFPA 70, and marked for intended location and application.

C. GRC: Comply with ANSI C80.1 and UL 6.

D. PVC-Coated Steel Conduit: PVC-coated rigid steel conduit]

1. Comply with NEMA RN 1.

2. Coating Thickness: 0.040 inch, minimum.

E. EMT: Comply with ANSI C80.3 and UL 797.

F. LFMC: Flexible steel conduit with PVC jacket and complying with UL 360.

G. Fittings for Metal Conduit: Comply with NEMA FB 1 and UL 514B.

1. Conduit Fittings for Hazardous (Classified) Locations: Comply with UL 886 and NFPA 70.

2. Fittings for EMT:

TS-171

Page 288 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 3
a. Material: Steel
b. Type: Setscrew.

3. Expansion Fittings: PVC or steel to match conduit type, complying with UL 651, rated for environmental conditions where installed, and including flexible external bonding jumper.

4. Coating for Fittings for PVC-Coated Conduit: Minimum thickness of 0.040 inch, with overlapping sleeves protecting threaded joints.

H. Joint Compound for GRC: Approved, as defined in NFPA 70, by authorities having jurisdiction for use in conduit assemblies, and compounded for use to lubricate and protect threaded conduit joints from corrosion and to enhance their conductivity.

2.2 NONMETALLIC CONDUITS, TUBING, AND FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. CANTEX Inc.

2. Condux International, Inc.

3. Electri-Flex Company.

4. Lamson & Sessions; Carlon Electrical Products.

5. RACO; a Hubbell company.

6. Thomas & Betts Corporation.

B. Listing and Labeling: Nonmetallic conduits, tubing, and fittings shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated.

D. Fittings for RNC: Comply with NEMA TC 3; match to conduit or tubing type and material.

2.3 BOXES, ENCLOSURES, AND CABINETS
A. Manufacturers:

1. Cooper Technologies Company; Cooper Crouse-Hinds.

2. EGS/Appleton Electric.

3. Hoffman; a Pentair company.

4. Hubbell Incorporated; Killark Division.

5. O-Z/Gedney; a brand of EGS Electrical Group.

6. RACO; a Hubbell Company.

7. Robroy Industries.

8. Thomas & Betts Corporation.

9. Wiremold / Legrand.

B. General Requirements for Boxes, Enclosures, and Cabinets: Boxes, enclosures, and cabinets installed in wet locations shall be listed for use in wet locations.

C. Cast-Metal Outlet and Device Boxes: Comply with NEMA FB 1, Type FD, with gasketed cover.

D. Luminaire Outlet Boxes: Nonadjustable, designed for attachment of luminaire weighing 50 lb.

Outlet boxes designed for attachment of luminaires weighing more than 50 lb shall be listed and marked for the maximum allowable weight.

TS-172

Page 289 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 4
E. Device Box Dimensions: 4 inches square by 2-1/8 inches deep.

F. Gangable boxes are prohibited.

G. Hinged-Cover Enclosures: Comply with UL 50 and NEMA 250, Type 3R with continuous-hinge cover with flush latch unless otherwise indicated.

1. Metal Enclosures: Steel, finished inside and out with manufacturer's standard enamel.

H. Cabinets:

1. NEMA 250, Type 3R galvanized-steel box with removable interior panel and removable front, finished inside and out with manufacturer's standard enamel.

2. Hinged door in front cover with flush latch and concealed hinge.

3. Key latch to match panelboards.

4. Metal barriers to separate wiring of different systems and voltage.

5. Accessory feet where required for freestanding equipment.

6. Nonmetallic cabinets shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

2.4 HANDHOLES AND BOXES FOR EXTERIOR UNDERGROUND WIRING A. General Requirements for Handholes and Boxes:

1. Boxes and handholes for use in underground systems shall be designed and identified as defined in NFPA 70, for intended location and application.

2. Boxes installed in wet areas shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Polymer-Concrete Handholes and Boxes with Polymer-Concrete Cover: Molded of sand and aggregate, bound together with polymer resin, and reinforced with steel, fiberglass, or a combination of the two.

1. Manufacturers:
a. Jensen Precast Inc.
b. CDR Systems Corporation; Hubbell Power Systems.
c. Oldcastle Precast, Inc.; Christy Concrete Products.
d. Synertech Moulded Products; a division of Oldcastle Precast, Inc.

2. Standard: Comply with SCTE 77.

3. Configuration: Designed for flush burial with open bottom unless otherwise indicated.

4. Cover: Weatherproof, secured by tamper-resistant locking devices and having structural load rating consistent with enclosure and handhole location.

5. Cover Finish: Nonskid finish shall have a minimum coefficient of friction of 0.50.

6. Cover Legend: Molded lettering. Boxes containing conductors and cables over 600V, the cover shall include permanently engraved name of the utility company (e.g SCE), type of utility (e.g. ELECTRIC), DANGER-HIGH VOLTAGE-KEEP OUT” in minimum 1/2" inch size, block letters.

2.5 SOURCE QUALITY CONTROL FOR UNDERGROUND ENCLOSURES
A. Handhole and Pull-Box Prototype Test: Test prototypes of handholes and boxes for compliance with SCTE 77. Strength tests shall be for specified tier ratings of products supplied.

TS-173

Page 290 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 5

1. Tests of materials shall be performed by an independent testing agency.

2. Strength tests of complete boxes and covers shall be by either an independent testing agency or manufacturer. A qualified registered professional engineer shall certify tests by manufacturer.

3. Testing machine pressure gages shall have current calibration certification complying with ISO 9000 and ISO 10012 and traceable to NIST standards.

PART 3 - EXECUTION

3.1 RACEWAY APPLICATION
A. Outdoors: Apply raceway products as specified below unless otherwise indicated:

1. Exposed Conduit: GRC 12 inches and higher above grade, PVC-Coated Steel Conduit within 12 inches of grade.

2. Underground Conduit: Type EPC-80-PVC.

3. Boxes and Enclosures, Aboveground: NEMA 250, Type 4X Stainless Steel.

B. Minimum Raceway Size: 3/4-inch trade size.

C. Raceway Fittings: Compatible with raceways and suitable for use and location.

1. Rigid Steel Conduit: Use threaded rigid steel conduit fittings unless otherwise indicated.

Comply with NEMA FB 2.10.

2. PVC Externally Coated, Rigid Steel Conduits: Use only fittings listed for use with this type of conduit. Patch and seal all joints, nicks, and scrapes in PVC coating after installing conduits and fittings. Use sealant recommended by fitting manufacturer and apply in thickness and number of coats recommended by manufacturer.

3. EMT: Use compression fittings. Comply with NEMA FB 2.10.

4. Flexible Conduit: Use only fittings listed for use with flexible conduit. Comply with NEMA FB 2.20.

D. Install nonferrous conduit or tubing for circuits operating above 60 Hz. Where aluminum raceways are installed for such circuits and pass through concrete, install in nonmetallic sleeve.

E. Do not install aluminum conduits, boxes, or fittings in contact with concrete or earth.

F. Install surface raceways only where indicated on Drawings.

G. Do not install nonmetallic conduit where ambient temperature exceeds 120 deg F.

3.2 INSTALLATION
A. Comply with NECA 1 and NECA 101 for installation requirements except where requirements on Drawings or in this article are stricter. Comply with NECA 102 for aluminum conduits.

Comply with NFPA 70 limitations for types of raceways allowed in specific occupancies and number of floors.

B. Complete raceway installation before starting conductor installation.

C. Arrange stub-ups so curved portions of bends are not visible above finished grade.

TS-174

Page 291 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 6
D. Install no more than the equivalent of three 90-degree bends in any conduit run except for control wiring conduits, for which fewer bends are allowed. Support within 12 inches of changes in direction.

E. Conceal conduit unless otherwise indicated. Install conduits parallel or perpendicular to site lines.

F. Support conduit within 12 inches of enclosures to which attached.

G. Threaded Conduit Joints, Exposed to Wet, Damp, Corrosive, or Outdoor Conditions: Apply listed compound to threads of raceway and fittings before making up joints. Follow compound manufacturer's written instructions.

H. Coat field-cut threads on PVC-coated raceway with a corrosion-preventing conductive compound prior to assembly.

I. Raceway Terminations at Locations Subject to Moisture or Vibration: Use insulating bushings to protect conductors including conductors smaller than No. 4 AWG.

J. Terminate threaded conduits into threaded hubs or with locknuts on inside and outside of boxes or cabinets. Install bushings on conduits up to 1-1/4-inch trade size and insulated throat metal bushings on 1-1/2-inch trade size and larger conduits terminated with locknuts. Install insulated throat metal grounding bushings on service conduits.

K. Install raceways square to the enclosure and terminate at enclosures with locknuts. Install locknuts hand tight plus 1/4 turn more.

L. Do not rely on locknuts to penetrate nonconductive coatings on enclosures. Remove coatings in the locknut area prior to assembling conduit to enclosure to assure a continuous ground path.

M. Cut conduit perpendicular to the length. For conduits 2-inch trade size and larger, use roll cutter or a guide to make cut straight and perpendicular to the length.

N. Install pull wires in empty raceways. Use polypropylene or monofilament plastic line with not less than 250lbs (113 kgs) tensile strength. Leave at least 12 inches of slack at each end of pull wire. Provide acrylic identification tags (2”X4”) at each end indicating the source. Cap underground raceways designated as spare above grade alongside raceways in use.

O. Surface Raceways:

1. Install surface raceway with a minimum 2-inchradius control at bend points.

2. Secure surface raceway with screws or other anchor-type devices at intervals not exceeding 48 inches and with no less than two supports per straight raceway section.

Support surface raceway according to manufacturer's written instructions. Tape and glue are not acceptable support methods.

P. Install raceway sealing fittings at accessible locations according to NFPA 70 and fill them with listed sealing compound. For concealed raceways, install each fitting in a flush steel box with a blank cover plate having a finish similar to that of adjacent plates or surfaces. Install raceway sealing fittings according to NFPA 70.

Q. Install devices to seal raceway interiors at accessible locations. Locate seals so no fittings or boxes are between the seal and the following changes of environments. Seal the interior of all raceways at the following points:

TS-175

Page 292 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 7

1. Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces.

2. Where an underground service raceway enters a building or structure.

3. Where otherwise required by NFPA 70.

R. Comply with manufacturer's written instructions for solvent welding RNC and fittings.

S. Expansion-Joint Fittings:

1. RMC and EMT conduit that is located where environmental temperature change may exceed 100 deg F and that has straight-run length that exceeds 100 feet.

2. Install type and quantity of fittings that accommodate temperature change listed for each of the following locations:
a. Outdoor Locations Not Exposed to Direct Sunlight: 125 deg F temperature change. b. Outdoor Locations Exposed to Direct Sunlight: 155 deg F temperature change.

3. Install fitting(s) that provide expansion and contraction for at least 0.00041 inch per foot of length of straight run per deg F of temperature change for PVC conduits. Install fitting(s) that provide expansion and contraction for at least 0.000078 inch per foot of length of straight run per deg F of temperature change for metal conduits.

4. Install expansion fittings at all locations where conduits cross building or structure expansion joints.

5. Install each expansion-joint fitting with position, mounting, and piston setting selected according to manufacturer's written instructions for conditions at specific location at time of installation. Install conduit supports to allow for expansion movement.

T. Flexible Conduit Connections: Comply with NEMA RV 3. Use a maximum of 72 inches of flexible conduit for equipment subject to vibration, noise transmission, or movement; and for transformers and motors.

1. Use LFMC in damp or wet locations.

U. Mount boxes at heights indicated on Drawings. If mounting heights of boxes are not individually indicated, give priority to ADA requirements. Install boxes with height measured to center of box unless otherwise indicated.

V. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of masonry block, and install box flush with surface of wall. Prepare block surfaces to provide a flat surface for a raintight connection between box and cover plate or supported equipment and box.

W. Horizontally separate boxes mounted on opposite sides of walls so they are not in the same vertical channel.

X. Locate boxes so that cover or plate will not span different building finishes.

Y. Support boxes of three gangs or more from more than one side by spanning two framing members or mounting on brackets specifically designed for the purpose.

Z. Fasten junction and pull boxes to or support from building structure. Do not support boxes by conduits.

AA. Set metal floor boxes level and flush with finished floor surface.

BB. Set nonmetallic floor boxes level. Trim after installation to fit flush with finished floor surface.

TS-176

Page 293 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
RACEWAYS & BOXES FOR ELECT. SYSTEMS 260533 - 8

3.3 INSTALLATION OF UNDERGROUND CONDUIT
A. Direct-Buried Conduit:

1. Excavate trench bottom to provide firm and uniform support for conduit. Prepare trench bottom as specified in Section 312000 "Earth Moving" for pipe less than 6 inches in nominal diameter.

2. Install backfill as specified in Section 312000 "Earth Moving."

3. After installing conduit, backfill and compact. Start at tie-in point, and work toward end of conduit run, leaving conduit at end of run free to move with expansion and contraction as temperature changes during this process. Firmly hand tamp backfill around conduit to provide maximum supporting strength. After placing controlled backfill to within 12 inches of finished grade, make final conduit connection at end of run and complete backfilling with normal compaction as specified in Section 312000 "Earth Moving."

4. Install manufactured duct elbows for stub-ups at poles and equipment.

5. Underground Warning Tape: Comply with requirements in Section 260553 "Identification for Electrical Systems."

3.4 INSTALLATION OF UNDERGROUND HANDHOLES AND BOXES
A. Install handholes and boxes level and plumb and with orientation and depth coordinated with connecting conduits to minimize bends and deflections required for proper entrances. Top of conduits inside the handhole/box shall be minimum 4 inches above the bottom of the handhole/box.

B. Unless otherwise indicated, support units on a level bed of crushed stone or gravel (minimum 6 inch high), graded from 1/2-inch sieve to No. 4 sieve and compacted to same density as adjacent undisturbed earth.

C. Elevation: In paved areas, set so cover surface will be flush with finished grade. Set covers of other enclosures 1 inch above finished grade.

D. Install handholes with bottom below frost line.

E. Install removable hardware, including pulling eyes, cable stanchions, cable arms, and insulators, as required for installation and support of cables and conductors and as indicated.

Select arm lengths to be long enough to provide spare space for future cables but short enough to preserve adequate working clearances in enclosure.

3.5 PROTECTION
A. Protect coatings, finishes, and cabinets from damage and deterioration.

1. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer.

2. Repair damage to PVC coatings or paint finishes with matching touchup coating recommended by manufacturer.

END OF SECTION 260533
TS-177

Page 294 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 1
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Color and legend requirements for raceways, conductors, and warning labels and signs.

2. Labels.

3. Bands and tubes.

4. Tapes and stencils.

5. Tags.

6. Signs.

7. Cable ties.

8. Paint for identification.

9. Fasteners for labels and signs.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for electrical identification products.

B. Identification Schedule: For each piece of electrical equipment and electrical system components to be an index of nomenclature for electrical equipment and system components used in identification signs and labels. Use same designations indicated on Drawings.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Comply with ASME A13.1and IEEE C2.

B. Comply with NFPA 70.

C. Comply with 29 CFR 1910.144 and 29 CFR 1910.145.

D. Comply with ANSI Z535.4 for safety signs and labels.

E. Adhesive-attached labeling materials, including label stocks, laminating adhesives, and inks used by label printers, shall comply with UL 969.

TS-178

Page 295 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 2
F. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

2.2 COLOR AND LEGEND REQUIREMENTS
A. Raceways and Cables Carrying Circuits at 600 V or Less:

1. Black letters on an orange field.

2. Legend: Indicate voltage and system or service type.

B. Color-Coding for Phase- and Voltage-Level Identification, 600 V or Less: Use colors listed below for ungrounded service’ feeder and branch-circuit conductors.

1. Color shall be factory applied.

2. Colors for 208/120-V Circuits:
a. Phase A: Black.
b. Phase B: Red.
c. Phase C: Blue.

3. Colors for 240-V Circuits:
a. Phase A: Black.
b. Phase B: Red.

4. Color for Neutral: White.

5. Color for Equipment Grounds: Green.

6. Colors for Isolated Grounds: Green with white stripe.

C. Warning Label Colors:

1. Identify system voltage with black letters on an orange background.

D. Warning labels and signs shall include, but are not limited to, the following legends:

1. Multiple Power Source Warning: "DANGER - ELECTRICAL SHOCK HAZARD - EQUIPMENT HAS MULTIPLE POWER SOURCES."

2. Workspace Clearance Warning: "WARNING - OSHA REGULATION - AREA IN FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36 INCHES." E. Equipment Identification Labels:

1. Black letters on a white field for equipment connected to normal power and Red letters on a white field for solar or battery equipment unless otherwise indicated

2.3 LABELS
A. Vinyl Wraparound Labels: Preprinted, flexible labels laminated with a clear, weather- and chemical-resistant coating and matching wraparound clear adhesive tape for securing label ends.

TS-179

Page 296 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 3

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. HellermannTyton.
c. Marking Services, Inc.
d. Panduit Corp.
e. Seton Identification Products.

B. Snap-around Labels: Slit, pretensioned, flexible, preprinted, color-coded acrylic sleeves, with diameters sized to suit diameters and that stay in place by gripping action.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. HellermannTyton.
c. Marking Services, Inc.
d. Panduit Corp.
e. Seton Identification Products.

C. Self-Adhesive Wraparound Labels: Preprinted, 3-mil-thick, polyesterflexible label with acrylic pressure-sensitive adhesive.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. .
c. Grafoplast Wire Markers.
d. Ideal Industries, Inc.
e. Marking Services, Inc.
f. Panduit Corp.
g. Seton Identification Products.

2. Self-Lamination: Clear; UV-, weather- and chemical-resistant; self-laminating, protective shield over the legend. Labels sized such that the clear shield overlaps the entire printed legend.

3. Marker for Labels: Permanent, waterproof, black ink marker recommended by tag manufacturer.

D. Self-Adhesive Labels: Vinyl, thermal, transfer-printed, 3-mil-thick, multicolor, weather- and UVresistant, pressure-sensitive adhesive labels, configured for intended use and location.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Grafoplast Wire Markers.
c. HellermannTyton.
d. Ideal Industries, Inc.
e. Marking Services, Inc.
f. Panduit Corp.
g. Seton Identification Products.

TS-180

Page 297 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 4

2. Minimum Nominal Size:
a. 1-1/2 by 6 inchesfor raceway and conductors.
b. 3-1/2 by 5 inchesfor equipment.
c. As required by authorities having jurisdiction.

2.4 BANDS AND TUBES
A. Snap-around, Color-Coding Bands: Slit, pretensioned, flexible, solid-colored acrylic sleeves, 2 inches long, with diameters sized to suit diameters and that stay in place by gripping action.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. HellermannTyton.
c. Marking Services, Inc.
d. Panduit Corp.

B. Heat-Shrink Preprinted Tubes: Flame-retardant polyolefin tubes with machine-printed identification labels, sized to suit diameter and shrunk to fit firmly. Full shrink recovery occurs at a maximum of 200 deg F. Comply with UL 224.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Panduit Corp.

2.5 TAPES AND STENCILS
A. Marker Tapes: Vinyl or vinyl-cloth, self-adhesive wraparound type, with circuit identification legend machine printed by thermal transfer or equivalent process.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Carlton Industries, LP.
b. HellermannTyton.
c. Ideal Industries, Inc.
d. Marking Services, Inc.
e. Panduit Corp.

B. Self-Adhesive Vinyl Tape: Colored, heavy duty, waterproof, fade resistant; not less than 3 mils thick by 1 to 2 inches wide; compounded for outdoor use.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Carlton Industries, LP.
c. emedco.
d. Marking Services, Inc.

TS-181

Page 298 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 5
C. Tape and Stencil: 4-inch-wide black stripes on 10-inch centers placed diagonally over orange background and is 12 inches wide. Stop stripes at legends.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. HellermannTyton.
b. LEM Products Inc.
c. Marking Services, Inc.
d. Seton Identification Products.

D. Floor Marking Tape: 2-inch-wide, 5-mil pressure-sensitive vinyl tape, with yellow and black stripes and clear vinyl overlay.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Carlton Industries, LP.
b. Seton Identification Products.

E. Underground-Line Warning Tape:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Ideal Industries, Inc.
c. Marking Services, Inc.
d. Seton Identification Products.

2. Tape:
a. Recommended by manufacturer for the method of installation and suitable to identify and locate underground electrical and communications utility lines. b. Printing on tape shall be permanent and shall not be damaged by burial operations.
c. Tape material and ink shall be chemically inert and not subject to degradation when exposed to acids, alkalis, and other destructive substances commonly found in soils.

3. Color and Printing:
a. Comply with ANSI Z535.1, ANSI Z535.2, ANSI Z535.3, ANSI Z535.4, and ANSI Z535.5.
b. Inscriptions for Red-Colored Tapes: "CAUTION BURIED ELECTRIC LINE, HIGH VOLTAGE" .
c. Inscriptions for Orange-Colored Tapes: "CAUTION BURIED TELEPHONE CABLE, CATV CABLE, COMMUNICATIONS CABLE, OPTICAL FIBER CABLE" .

4. Tag: Type IID:
a. Reinforced, detectable three-layer laminate, consisting of a printed pigmented woven scrim, a solid aluminum-foil core, and a clear protective film that allows inspection of the continuity of the conductive core; bright-colored, continuous- TS-182

Page 299 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 6
printed on one side with the inscription of the utility, compounded for direct-burial service.
b. Width: 6 inches.
c. Overall Thickness: 5 mils.
d. Foil Core Thickness: 0.35 mil.
e. Weight: 34 lb/1000 sq. ft..
f. Tensile according to ASTM D 882: 300 lbf and 12,500 psi.

2.6 TAGS
A. Metal Tags: Brass or aluminum, 2 by 2 by 0.05 inch, with stamped legend, punched for use with self-locking cable tie fastener.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Carlton Industries, LP.
c. emedco.
d. Marking Services, Inc.
e. Seton Identification Products.

2.7 SIGNS
A. Baked-Enamel Signs:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Carlton Industries, LP.
b. Champion America.
c. emedco.
d. Marking Services, Inc.

2. Preprinted aluminum signs, high-intensity reflective, punched or drilled for fasteners, with colors, legend, and size required for application.

3. 1/4-inch grommets in corners for mounting.

4. Nominal Size: 7 by 10 inches.

B. Metal-Backed Butyrate Signs:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Champion America.
c. emedco.
d. Marking Services, Inc.

2. Weather-resistant, nonfading, preprinted, cellulose-acetate butyrate signs, with 0.0396- inch galvanized-steel backing, punched and drilled for fasteners, and with colors, legend, and size required for application.

3. 1/4-inch grommets in corners for mounting.

TS-183

Page 300 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 7

4. Nominal Size: 10 by 14 inches.

C. Laminated Acrylic or Melamine Plastic Signs:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Carlton Industries, LP.
c. emedco.
d. Marking Services, Inc.

2. Engraved legend.

3. Thickness:
a. For signs up to 20 sq. in., minimum 1/16 inch thick. b. For signs larger than 20 sq. in., 1/8 inch thick.
c. Engraved legend with black letters on white face background for equipment connected to normal power and red letters on white face background for solar and battery equipment.
d. Punched or drilled for mechanical fasteners with 1/4-inch grommets in corners for mounting.
e. Framed with mitered acrylic molding and arranged for attachment at applicable equipment.

2.8 CABLE TIES
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. HellermannTyton.

2. Ideal Industries, Inc.

3. Marking Services, Inc.

4. Panduit Corp.

B. UV-Stabilized Cable Ties: Fungus inert, designed for continuous exposure to exterior sunlight, self-extinguishing, one piece, self-locking, and Type 6/6 nylon.

1. Minimum Width: 3/16 inch.

2. Tensile Strength at 73 Deg F according to ASTM D 638: 12,000 psi.

3. Temperature Range: Minus 40 to plus 185 deg F.

4. Color: Black.

2.9 MISCELLANEOUS IDENTIFICATION PRODUCTS
A. Paint: Comply with requirements in painting Sections for paint materials and application requirements. Retain paint system applicable for surface material and location (exterior or interior).

B. Fasteners for Labels and Signs: Self-tapping, stainless-steel screws or stainless-steel machine screws with nuts and flat and lock washers.

TS-184

Page 301 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 8
PART 3 - EXECUTION

3.1 PREPARATION
A. Self-Adhesive Identification Products: Before applying electrical identification products, clean substrates of substances that could impair bond, using materials and methods recommended by manufacturer of identification product.

3.2 INSTALLATION
A. Verify and coordinate identification names, abbreviations, colors, and other features with requirements in other Sections requiring identification applications, Drawings, Shop Drawings, manufacturer's wiring diagrams, and operation and maintenance manual. Use consistent designations throughout Project.

B. Install identifying devices before installing acoustical ceilings and similar concealment.

C. Verify identity of each item before installing identification products.

D. Coordinate identification with Project Drawings, manufacturer's wiring diagrams, and operation and maintenance manual.

E. Apply identification devices to surfaces that require finish after completing finish work.

F. Install signs with approved legend to facilitate proper identification, operation, and maintenance of electrical systems and connected items.

G. System Identification for Raceways and Cables: Identification shall completely encircle cable or conduit. Place identification of two-color markings in contact, side by side.

1. Secure tight to surface of conductor, cable, or raceway.

H. Auxiliary Electrical Systems Conductor Identification: Identify field-installed alarm, control, and signal connections.

I. Emergency Operating Instruction Signs: Install instruction signs with white legend on a red background with minimum 3/8-inch-high letters for emergency instructions at equipment used for power transfer. Refer to drawings for additional information.

J. Elevated Components: Increase sizes of labels, signs, and letters to those appropriate for viewing from the floor.

K. Accessible Fittings for Raceways: Identify the covers of each junction and pull box of the following systems with the wiring system legend and system voltage. System legends shall be as follows:

1. "SOLAR PHOTOVOLTAIC SYSTEM."

2. "BATTERY SYSTEM."
L. Vinyl Wraparound Labels:

1. Secure tight to surface of raceway or cable at a location with high visibility and accessibility.

TS-185

Page 302 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 9

2. Attach labels that are not self-adhesive type with clear vinyl tape, with adhesive appropriate to the location and substrate.

M. Snap-around Labels: Secure tight to surface at a location with high visibility and accessibility.

N. Self-Adhesive Wraparound Labels: Secure tight to surface at a location with high visibility and accessibility.

O. Self-Adhesive Labels:

1. On each item, install unique designation label that is consistent with wiring diagrams, schedules, and operation and maintenance manual.

2. Unless otherwise indicated, provide a single line of text with 1/2-inch-high letters on 1- 1/2-inch-high label; where two lines of text are required, use labels 2 inches high.

P. Snap-around Color-Coding Bands: Secure tight to surface at a location with high visibility and accessibility.

Q. Heat-Shrink, Preprinted Tubes: Secure tight to surface at a location with high visibility and accessibility.

R. Marker Tapes: Secure tight to surface at a location with high visibility and accessibility.

S. Self-Adhesive Vinyl Tape: Secure tight to surface at a location with high visibility and accessibility.

1. Field-Applied, Color-Coding Conductor Tape: Apply in half-lapped turns for a minimum distance of 6 inches where splices or taps are made. Apply last two turns of tape with no tension to prevent possible unwinding.

T. Tape and Stencil: Comply with requirements in painting Sections for surface preparation and paint application.

U. Floor Marking Tape: Apply stripes to finished surfaces following manufacturer's written instructions.

V. Underground Line Warning Tape:

1. During backfilling of trenches, install continuous underground-line warning tape directly above cable or raceway at 12 inches below finished grade. Use multiple tapes where width of multiple lines installed in a common trench or concrete envelope exceeds 16 inches overall.

2. Install underground-line warning tape for direct-buried cables and cables in raceways.

W. Metal Tags:

1. Place in a location with high visibility and accessibility.

2. Secure using general-purpose UV-stabilized cable ties for all area except use plenumrated cable ties in plenum areas.

X. Nonmetallic Preprinted Tags:

1. Place in a location with high visibility and accessibility.

2. Secure using general-purpose UV-stabilized in all areas except use plenum-rated cable ties in plenum areas.

TS-186

Page 303 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 10
Y. Baked-Enamel Signs:

1. Attach signs that are not self-adhesive type with mechanical fasteners appropriate to the location and substrate.

2. Unless otherwise indicated, provide a single line of text with 1/2-inch-high letters on minimum 1-1/2-inch-high sign; where two lines of text are required, use signs minimum 2 inches high.

Z. Metal-Backed Butyrate Signs:

1. Attach signs that are not self-adhesive type with mechanical fasteners appropriate to the location and substrate.

2. Unless otherwise indicated, provide a single line of text with 1/2-inch-high letters on 1- 1/2-inch-high sign; where two lines of text are required, use labels 2 inches high.

AA. Laminated Acrylic or Melamine Plastic Signs:

1. Attach signs that are not self-adhesive type with mechanical fasteners appropriate to the location and substrate.

2. Unless otherwise indicated, provide a single line of text with 1/2-inch-high letters on 1- 1/2-inch-high sign; where two lines of text are required, use labels 2 inches high.

BB. Cable Ties: General purpose, for attaching tags, except as listed below:

1. Outdoors: UV-stabilized nylon.

2. In Spaces Handling Environmental Air: Plenum rated.

3.3 IDENTIFICATION SCHEDULE
A. Install identification materials and devices at locations for most convenient viewing without interference with operation and maintenance of equipment. Install access doors or panels to provide view of identifying devices.

B. Identify conductors, cables, and terminals in enclosures and at junctions, terminals, pull points, and locations of high visibility. Identify by system and circuit designation.

1. Locate identification at changes in direction, at penetrations of walls and floors, and at 10-foot maximum intervals unless otherwise indicated.

C. Accessible Raceways and Metal-Clad Cables, 600 V or Less, for Service, Feeder, and Branch Circuits, More Than 30 A and 120 V to Ground: Identify with self-adhesive raceway labels.

1. Locate identification at changes in direction, at penetrations of walls and floors, at 50-foot maximum intervals in straight runs, and at 25-foot maximum intervals in congested areas.

D. Accessible Fittings for Raceways and Cables within Buildings: Identify the covers of each junction and pull box of the following systems with self-adhesive labels containing the wiring system legend and system voltage. System legends shall be as follows:

1. "SOLAR PHOTOVOLTAIC SYSTEM."

2. "BATTERY SYSTEM."
E. Power-Circuit Conductor Identification, More Than 600 V: For conductors in vaults, pull and junction boxes, manholes, and handholes, use nonmetallic preprinted tags colored and marked to indicate phase, and a separate tag with the circuit designation.

TS-187

Page 304 of 564 ends

Parking Lot “D”
City of Hermosa Beach November 2018, Revised June 2021
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 11
F. Control-Circuit Conductor Identification: For conductors and cables in pull and junction boxes, manholes, and handholes, use self-adhesive labels with the conductor or cable designation, origin, and destination.

G. Control-Circuit Conductor Termination Identification: For identification at terminations, provide heat-shrink preprinted tubes with the conductor designation.

H. Locations of Underground Lines: Underground-line warning tape for power, lighting, communication, and control wiring and optical-fiber cable.

I. Instructional Signs: Self-adhesive labels, including the color code for grounded and ungrounded conductors.

J. Operating Instruction Signs: Laminated acrylic or melamine plastic signs.

K. Emergency Operating Instruction Signs: Laminated acrylic or melamine plastic signs with white legend on a red background with minimum 3/8-inch-high letters for emergency instructions at equipment used for power transfer.

L. Equipment Identification Labels:

1. Outdoor Equipment: Laminated acrylic or melamine sign. Stenciled legend 4 inches high shall also be provided when requested by Architect.

2. Equipment to Be Labeled:
a. Panelboards: Typewritten directory of circuits in the location provided by panelboard manufacturer. Panelboard identification shall be in the form of a engraved, laminated acrylic or melamine label.
b. Enclosures and electrical cabinets.
c. Access doors and panels for concealed electrical items. d. Power-transfer equipment.
e. Contactors.
f. Remote-controlled switches, dimmer modules, and control devices. g. Battery-inverter units.
h. Battery racks.
i. Power-generating units.
j. Monitoring and control equipment.

END OF SECTION 260553