KISS Logistics Center Project

City of Hesperia 16
Findings of Fact
December 2023
construction buffers around nests, thus limiting effects from most short -term indirect impacts, including noise and vibration, increased human presence, night-time lighting, and vehicle collisions. MM BIO-3 (Compliance Monitoring), MM BIO -4 (Education Program), and MM BIO -5 (Construction Monitoring Notebook) would require that all workers complete a WEAP training and would require ongoing biological monitoring and compliance with all biological resource mitigation requirements. MM BIO-7 (Hazardous Waste) would ensure that a prompt and effective response to any accidental chemical spills be implemented, and that repair and clean-up of any hazardous waste occurs. To reduce fugitive dust resulting from construction and to minimize adverse air quality impacts, the Project would employ dust mitigation measures in accordance with the Mojave Desert Air Qualit y Management District’s Rules 401 and 403.2, which limit the amount of fugitive dust generated during construction. MM BIO -12 (Lighting) would require night -time lighting during construction within 50 feet of habitat for special-status species to be shielded downward.

Potential long-term indirect impacts that could result from development within or adjacent to loggerhead shrike and LeConte’s thrasher habitat include nighttime lighting and increased invasive plant species that may degrade habitat. MM BIO-12 (Lighting) would require night-time lighting during operations within 50 feet of habitat for special-status species to be shielded downward. MM BIO-13 (Invasive Plant Management) would require that landscape plants within 200 feet of native vegetation comm unities shall not be on the most recent version of the Cal -IPC California Invasive Plant Inventory (http://www.cal - ipc.org/ip/inventory/index.php).

Implementation of MM BIO -3 (Compliance Monitoring), MM BIO -4 (Education Program), MM BIO -5 (Construction Monitoring Notebook), MM BIO-7 (Hazardous Waste), MM BIO-9 (Preconstruction Nesting Bird Surveys), MM BIO -12 (Lighting), and MM BIO -13 (Invasive Plant Management) would reduce potential construction impacts to loggerhead shrike and LeConte’s thrasher to less than significant.

Burrowing Owl
Based on the results of focused surveys within the BSA, burrowing owls are considered absent from the site.

However, this species may colonize an area quickly and continue to have a moderate potential to occur before construction begins. A pre-construction survey is needed to confirm their absence prior to construction.

MM BIO-10 (Pre-construction Surveys for Burrowing Owl and Avoidance) would require pre -construction burrowing owl surveys and result in establishment of construction buffers around any burrowing owl burrows found, thus limiting effects from most short -term indirect impacts, including noise and vibration, increased human presence, night -time lighting, and vehicle collisions. Project construction during bird nest ing season would be avoided.

MM BIO-10 (Pre-construction Surveys for Burrowing Owl and Avoidance) would require pre -construction burrowing owl surveys and result in establishment of construction buffers around any burrowing owl burrows found, thus limitin g effects from most short -term indirect impacts, including noise and vibration, increased human presence, night-time lighting, and vehicle collisions. MM BIO -3 (Compliance Monitoring), MM BIO -4 (Education Program), and MM BIO -5 (Construction Monitoring Not ebook) would require that all workers complete a WEAP training and would require ongoing biological monitoring and compliance with all biological resource mitigation requirements. MM BIO-7 (Hazardous Waste) would ensure that a prompt and effective response to any accidental chemical spills be implemented, and that repair and clean -up of any hazardous waste occurs. To reduce fugitive dust resulting from construction and to minimize adverse air quality impacts, the Project would employ dust mitigation measure s in accordance with the Mojave Desert Air Quality Management District’s Rules 401 and 403.2, which limit the amount of fugitive dust generated during construction. MM BIO-12 (Lighting) would require night-time lighting during construction within 50 feet of habitat for special-status species to be shielded downward.

Potential long-term indirect impacts that could result from development within or adjacent to burrowing owl habitat include nighttime lighting and increased invasive plant species that may degrade habitat. MM BIO-

Page 144 ends

KISS Logistics Center Project

City of Hesperia 17
Findings of Fact
December 2023
12 (Lighting) would require night-time lighting during operations within 50 feet of habitat for special-status species to be shielded downward. MM BIO-13 (Invasive Plant Management) would require that landscape plants within 200 feet of native vegetation communities shall not be on the most recent version of the Cal - IPC California Invasive Plant Inventory (http://www.cal-ipc.org/ip/inventory/index.php).

Implementation of MM BIO -3 (Compliance Monitoring), MM BIO -4 (Education Program), MM B IO-5 (Construction Monitoring Notebook), MM BIO-7 (Hazardous Waste), MM BIO-9 (Preconstruction Nesting Bird Surveys), MM BIO -12 (Lighting), and MM BIO -13 (Invasive Plant Management) would reduce potential construction impacts to burrowing owl to less than significant.

Crotch bumble bee
MM BIO-11 (Pre-construction Survey for Crotch Bumble Bee) would require pre-construction Crotch bumble bee surveys and result in establishment of construction buffers around any active nests, thus limiting effects from most short-term indirect impacts, including noise and vibration, increased human presence, night -time lighting, and vehicle collisions. MM BIO-3 (Compliance Monitoring), MM BIO-4 (Education Program), and MM BIO-5 (Construction Monitoring Notebook) would require that all workers complete a WEAP training and would require ongoing biological monitoring and compliance with all biological resource mitigation requirements. MM BIO -7 (Hazardous Waste) would ensure that a prompt and effective response to any accidental chemical spills be implemented, and that repair and clean-up of any hazardous waste occurs. To reduce fugitive dust resulting from construction and to minimize adverse air quality impacts, the Project would employ dust mitigation measures in accordance with the Mojave Desert Air Quality Management District’s Rules 401 and 403.2, which limit the amount of fugitive dust generated during construction. MM BIO -12 (Lighting) would require night -time lighting during construction within 50 feet of habitat for special -status species to be shielded downward.

Potential long-term indirect impacts that could result from development within or adjacent to burrowing owl habitat include nighttime lighting and increased invasive plant species that may degrade habitat. MM BIO- 12 (Lighting) would require night-time lighting during operations within 50 feet of habitat for special-status species to be shielded downward. MM BIO-13 (Invasive Plant Management) would require that landscape plants within 200 feet of native vegetation com munities shall not be on the most recent version of the Cal - IPC California Invasive Plant Inventory (http://www.cal-ipc.org/ip/inventory/index.php).

Implementation of MM BIO -3 (Compliance Monitoring), MM BIO -4 (Education Program), MM BIO -5 (Construction Monitoring Notebook), MM BIO-7 (Hazardous Waste), MM BIO-9 (Preconstruction Nesting Bird Surveys), MM BIO -12 (Lighting), and MM BIO -13 (Invasive Plant Management) would reduce potential construction impacts to Crotch bumble bee to less than significant.

Operation
Loggerhead shrike
Extensive suitable nesting habitat, particularly western Joshua trees, is present within the BSA. The Project would result in the loss of 32.0 acres of suitable habitat for loggerhead shrike, including impacts to desert almond—Mexican bladdersage scrub, Joshua tree woodland, and California buckwheat scrub. These potential direct impacts to loggerhead shrike could be considered significant.

To avoid potential impacts to nesting loggerhead shrike, vegetation removal activities would be conducted outside the general bird nesting season (February 1 through August 31). If vegetation cannot be removed outside the bird nesting season, a pre -construction nesting bird survey would be conducted by a qualified biologist prior to vegetation removal. This requirement is outlined in MM BIO-9 (Pre-construction Nesting Bird Surveys).

Page 145 ends

KISS Logistics Center Project

City of Hesperia 18
Findings of Fact
December 2023
As required by MM BIO -2, mitigation for direct impacts to 9.5 acres of western Joshua trees, their seed bank, and their associated habitat will be fulfilled through conservation of western Joshua tree through purchase of credits at a CDFW-approved mitigation bank or payment of in-lieu fees per the Western Joshua Tree Conservation Act as approved by the City of Hesperia and CDFW. Conservation efforts for western Joshua tree would focus on the conservation of large, interconnected Joshua tree woodlands on lands where edge effects are limited, versus lands in urban settings that are subject to habitat fragmentation and edge effects, such as the Project site. Thus, mitigat ion for impacts to western Joshua tree would also mitigate impacts to loss of suitable habitat for loggerhead shrike.

Potential long-term indirect impacts that could result from development within or adjacent to loggerhead shrike habitat include night -time lighting and increased invasive plant species that may degrade habitat.

MM BIO-12 (Lighting) would require night -time lighting during operations within 50 feet of habitat for special-status species to be shielded downward. MM BIO -13 (Invasive Plant Manage ment) would require that landscape plants within 200 feet of native vegetation communities not be on the most recent version of the California Invasive Plant Council’s Inventory of Invasive Plants (http://www.cal - ipc.org/ip/inventory/index.php).

Implementation of MM BIO -2 (Conservation of Western Joshua Tree Lands), MM BIO -9 (Pre-construction Nesting Bird Surveys and Avoidance), MM BIO -12, and MM BIO -13 would reduce potential operational impacts to loggerhead shrike to less than significant.

LeConte’s Thrasher
The Project would result in the loss of approximately 22.5 acres of suitable habitat for LeConte’s thrasher, including impacts to desert almond —Mexican bladdersage scrub, and California buckwheat scrub. These potential direct impacts to LeConte’s thrasher could be considered significant.

To avoid potential impacts to nesting LeConte’s thrasher, vegetation removal activities would be conducted outside the general bird nesting season (February 1 through August 31). If vegetation cannot be removed outside the bird nesting season, a pre -construction nesting bird survey would be conducted by a qualified biologist prior to vegetation removal. This requirement is outlined in MM BIO-9 (Pre-construction Nesting Bird Surveys).

As required by MM BIO -2, mitigation for direct impacts to 9.5 acres of western Joshua trees, their seed bank, and their associated habitat will be fulfilled through conservation of western Joshua tree through purchase of credits at a CDFW -approved mitigation bank or other conservation mechanism approved by the City of Hesperia and CDFW. Conservation efforts for western Joshua tree would focus on the conservation of large, interconnected Joshua tree woodlands on lands where edge effects are limited, versus lands in urban settings that are subject to habitat fragmentation and edge effects, such as the Project site.

Thus, mitigation for impacts to western Joshua tree would also mitigate impacts to loss of suitable habitat for LeConte’s thrasher.

Potential long -term indirect impacts that could result from development within or adjacent to LeConte’s thrasher habitat include night-time lighting and increased invasive plant species that may degrade habitat.

MM BIO-12 (Lighting) would require night -time lighting duri ng operations within 50 feet of habitat for special-status species to be shielded downward. MM BIO -13 (Invasive Plant Management) would require that landscape plants within 200 feet of native vegetation communities not be on the most recent version of the California Invasive Plant Council’s Inventory of Invasive Plants (http://www.cal - ipc.org/ip/inventory/index.php).

Implementation of MM BIO-2 (Conservation of Western Joshua Tree Lands) and MM BIO-9 (Pre-construction Nesting Bird Surveys) would reduce poten tial operational impacts to LeConte’s thrasher to less than significant.

Page 146 ends

KISS Logistics Center Project

City of Hesperia 19
Findings of Fact
December 2023
Burrowing Owl
The Project would result in the loss of 32.7 acres of suitable habitat for burrowing owl, including impacts to desert almond —Mexican bladdersage scrub, Joshua tree woodl and, California buckwheat scrub , and disturbed habitat. These potential direct impacts to burrowing owls could be considered significant. Focused surveys for burrowing owl conducted in 2022 (see Table 5.3-1, Biological Site Surveys). Based on the results of focused surveys within the study area, burrowing owls are considered absent from the site. However, this species may colonize an area quickly and continue to have a moderate potential to occur before construction begins. A pre-construction survey is needed to confirm their absence prior to construction.

Pursuant to the California Fish and Game Code and the MBTA, a pre-construction survey in compliance with Staff Report on Burrowing Owl Mitigation, State of California Natural Resource Agency, Department of Fish and Game, May 7, 2012 (CDFW 2012) would be necessary to reevaluate the locations of potential burrowing owl burrows located within the Project limits so take of owls or active owl nests can be avoided.

Consistent with MM BIO -10 (Preconstruction Surve ys for Burrowing Owl), a pre -construction survey for burrowing owl shall be conducted in areas supporting potentially suitable habitat and within 14 days prior to the start of construction activities. A Burrowing Owl Relocation Plan has been prepared to fa cilitate implementation of this mitigation measure (included under Appendix C). In addition, implementation of MM BIO-3 (Compliance Monitoring), MM BIO -4 (Education Programs), and MM BIO -5 (Construction Monitoring Notebook) would reduce potential direct impacts to a less-than significant level.

Joshua tree woodland is considered suitable habitat for burrowing owl. As required by MM BIO-2, mitigation for direct impacts to 9.5 acres of western Joshua trees, their seed bank, and their associated habitat will be fulfilled through conservation of western Joshua tree through purchase of credits at a CDFW -approved mitigation bank or other conservation mechanism approved by the City of Hesperia and CDFW.

Conservation efforts for western Joshua tree will focus on the conservation of large, interconnected Joshua tree woodlands on lands where edge effects are limited, versus lands in urban settings that are subject to habitat fragmentation and edge effects, such as the Project site. Thus, mitigation for impacts to weste rn Joshua tree will double as mitigation for impacts to loss of suitable habitat for burrowing owl, which use similar habitat.

Potential long-term indirect impacts that could result from development within or adjacent to burrowing owl habitat include night-time lighting and increased invasive plant species that may degrade habitat. MM BIO- 12 (Lighting) would require night-time lighting during operations within 50 feet of habitat for special-status species to be shielded downward. MM BIO-13 (Invasive Plant Management) would require that landscape plants within 200 feet of native vegetation communities not be on the most recent version of the California Invasive Plant Council’s Inventory of Invasive Plants (http://www.cal-ipc.org/ip/inventory/index.php).

Implementation of MM BIO-2 (Conservation of Western Joshua Tree Lands) and MM BIO-10 (Pre-construction Surveys for Burrowing Owl) would reduce potential operational impacts to burrowing owl to less than significant.

Crotch bumble bee
To avoid potential impacts to nesting Crotch bumble bee, ground disturbing activities would be conducted outside the Colony Active Period (April 1 through August 31). If vegetation cannot be removed outside the Colony Active Period, a pre ‐construction survey by a qualified biologist is required prior to ground disturbance. This requirement is outlined in MM BIO-11 (Pre-construction Survey for Crotch Bumble Bee).

If nest resources occupied by Crotch bumble bee are detected within the construction area, no construction activities shall occur within 100 feet of the construction zone, or as determined by a qualified biologist through evaluation of topographic features or distribution of floral resources. The nest resources will be avoided for the duration of the Crotch bumble bee nesting period (February 1 through October 31).

Page 147 ends

KISS Logistics Center Project

City of Hesperia 20
Findings of Fact
December 2023
If the above measures are followed, it is assumed that the Project shall not need to obtain authorization from CDFW through the California Endangered Species Act ITP process.

If the nest resources cannot be avoided , as outlined in this measure, the project applicant will consult with CDFW regarding the need to obtain an ITP. Any measures determined to be necessary through the ITP process to offset impacts to Crotch bumble bee may supersede measures provided in this CEQA document and shall be incorporated into the habitat mitigation and monitoring plan. In the event an ITP is needed, mitigation for direct impacts to Crotch bumble bee will be fulfilled through compensatory mitigation at a minimum 1:1 nesting habitat replacement of equal or better functions and values to those impacted by the Project, or as otherwise determined through the ITP process. Mitigation will be accomplished either through off-site conservation or through a CDFW-approved mitigation bank.

As required by MM BIO-1 (Western Joshua Tree Fee Payment), mitigation for direct impacts to 248 western Joshua trees will be fulfilled through payment of applicable fees consistent with The Western Joshua Tree Conservation Plan or through payment to a CDFW -approved mitigation bank. The fees will contribute to conservation of western Joshua tree, which will also provide habitat for Crotch bumble bee. Thus, mitigation for impacts to western Joshua tree would also mitigate for impacts to loss of potential habitat fo r Crotch bumble bee.

Implementation of MM BIO-1 (Western Joshua Tree Fee Payment) and MM BIO-11 (Pre-construction Survey for Crotch Bumble Bee) would reduce potential direct impacts to Crotch bumble bee to less than significant.

Conclusion
Therefore, the Project would result in less than significant direct or indirect impacts on species identified as candidate, sensitive, or special status in local or regional plans, policies, or regulations, or by CDFW, or USFWS with the implementation of MM BIO-1 through BIO-13.

MITIGATION MEASURES
MM BIO-1: Relocation of Desert Native Plants (Hesperia Municipal Code Chapter 16.24).

Prior to the issuance of grading permits, the Project Applicant shall submit an application and applicable fee paid to the City of Hesperi a for removal or relocation of protected native desert plants under Hesperia Municipal Code Chapter 16.24 as required and schedule a preconstruction site inspection with the Planning Division and the Building Division. The application shall include certification from a qualified Joshua tree and native desert plant expert(s) to determine that proposed removal or relocation of protected native desert plants are appropriate, supportive of a healthy environment, and in compliance with the City of Hesperia Municipal Code. Protected plants subject to Hesperia Municipal Code Chapter

16.24 may be relocated on -site, or within an area designated as an area for species to be adopted later. The application shall include a detailed plan for the removal of all protected plants on the Project site. The plan shall be prepared by a qualified Joshua tree and native desert plant expert(s). The plan shall include, but not be limited to, the following measures:
• Salvaged plants shall be transplanted expeditiously to either their final on-site location, or to an approved off-site area. If the plants cannot be expeditiously taken to their permanent relocation area at the time of excavation, they may be transplanted in a temporary area (stockpiled) prior to being moved to their permanent relocation site(s).

Page 148 ends

KISS Logistics Center Project

City of Hesperia 21
Findings of Fact
December 2023
• Western Joshua trees shall be marked on their north facing side prior to excavation. Transplanted western Joshua trees shall be planted in the same orientation as they currently occur on the Project site, with the marking on the north side of the trees facing north at the relocation site(s). • Transplanted plants shall be watered prior to and at the time of transplantation. The schedule of watering shall be determined by the qualified tree expert and desert native plant expert( s) to maintain plant health.

Watering of the transplanted plants shall continue under the guidance of qualified tree expert and desert native plant expert(s) until it has been determined that the transplants have become established in the permanent relocation site(s) and no longer require supplemental watering.

MM BIO-2: Conservation of Western Joshua Tree Lands (CESA) In the case that the California Fish and Game Commission lists western Joshua trees as threatened under the California Endangered Species Act, the following measure will be implemented:
• Prior to the initiation of Joshua tree removal, obtain California Endangered Species Act (CESA) ITP under Section 2081 of the Fish and Game Code. The Project Applicant will adhere to measures and conditions set forth within the ITP. • Mitigation for direct impacts to western Joshua trees shall be fulfilled through conservation of western Joshua trees at a 1:1 habitat replacement ratio, of equal or better functions and values to those impacted by the Project. Mitigation can be through purchases of credits at a California Department of Fish and Wildlife (CDFW) -approved mitigation bank for western Joshua tree.

Additionally, no take of western Joshua tree will occur without authorization from CDFW in the form of an ITP pursuant to Fish and Game Code 2081. • Name, qualifications, business address, and contact information of a biological monitor (designated botanist) shall be submitted to CDFW at least 30 days prior to Project activities. The designated botanist shall be responsible for monitoring Project activities to help minimize and fully mitigate or avoid incidental take of Joshua trees.
• The designated botanist shall have authority to immediately stop any activity that does not comply with the ITP, and/or to order any reasonable measure to avoid unauthorized take of an individual Joshua tree.
• The Project analyzed impacts to western Joshua trees, which overlap with the adjacent proposed developments. Any impacts to overlapping Joshua trees will be analyzed by CDFW to ensure no Joshua trees are mitigated twice. • The Western Joshua Tree Conservation Act has been approved by the California Fish and Game Commission. The Western Joshua Tree Conservation Act is now in effect, which provides an alternative mitigation option to traditional CESA mitigation. Alternative Western Joshua Tree Conservation Act mitigation mechanisms, providing equal or better function and value to existing mechanisms under CESA, will be implemented in combination with traditional mitigation banking or in lieu of mitigation banking as allowed under state law.

MM BIO-3 Compliance Monitoring. The Designated Biologist shall be on site daily when impacts occur. The Designated Biologist shall conduct compliance inspections to minimize incidental take of wester n Joshua trees and impacts to other sensitive biological resources; prevent unlawful take of western Joshua trees; and ensure that signs, stakes, and fencing are intact, and that impacts are only occurring outside the

Page 149 ends

KISS Logistics Center Project

City of Hesperia 22
Findings of Fact
December 2023
permitted impact footprint. Weekly written observation and inspection records that summarize oversight activities and compliance inspections and monitoring activities required by the ITP shall be prepared.

MM BIO-4 Education Program. An education program (Worker Environmental Awareness Program [WEAP]) for all persons employed or otherwise working in the Project area shall be administered before performing impacts. The WEAP shall consist of a presentation from the Designated Biologist that includes a discussion of the biology and status of western Joshua tree, burrowing owl, and loggerhead shrike; and other biological resources mitigation measures described in the California Environmental Quality Act document. Interpretation for non -English-speaking workers will be provided, and the same instruc tion shall be provided to any new workers before they are authorized to perform work in the Project area. Upon completion of the WEAP, employees shall sign a form stating they attended the program and understand all protection measures. This training shall be repeated at least once annually for long-term and/or permanent employees who will be conducting work in the Project area.

MM BIO-5 Construction Monitoring Notebook. The Designated Biologist shall maintain a construction monitoring notebook on site throughout the construction period, which shall include a copy of the biological resources mitigation measures with attachments and a list of signatures of all personnel who have successfully completed the education program. The permittee shall ensure that a copy of the construction monitoring notebook is available for review at the Project site upon request by the California Department of Fish and Wildlife.

MM BIO-6 Delineation of Property Boundaries. Before beginning activities that would cause impacts, the contractor shall, in consultation with the Designated Biologist, clearly delineate the boundaries with fencing, stakes, or flags, consistent with the grading plan, within which the impacts will take place. All impacts outside the fenced, staked, or flagged areas shall be avoided, and all fencing, stakes, and flags shall be maintained until the completion of impacts in that area.

MM BIO-7 Hazardous Waste. The Applicant shall immediately stop work and, pursuant to pertinent state and federal statutes and regulations, arrange for repair and clean up by qualified individuals of any fuel or hazardous waste leaks or spills at the time of occurrence, or as soon as it is safe to do so.

MM BIO-8 Herbicides. The Applicant shall limit herbicide use for invasive p lant species and shall use herbicides only if it has been determined that hand or mechanical efforts are infeasible. To prevent drift, the permittee shall apply herbicides only when wind speeds are less than 7 miles per hour. All herbicide application shall be performed by a licensed applicator and in accordance with all applicable federal, state, and local laws and regulations.

MM BIO-9: Pre-construction Nesting Bird Survey. Pre-construction Nesting Bird Surveys and Avoidance. Project construction would b e avoided during bird nesting season (typically February 1 through August 31). In the event construction is required to occur during bird nesting season, construction activities shall avoid the migratory bird nesting season, to reduce any potential significant impact to birds that may be nesting on the survey area. If construction activities must occur during the migratory

Page 150 ends

KISS Logistics Center Project

City of Hesperia 23
Findings of Fact
December 2023
bird nesting season, an avian nesting survey of the Project site and within 500 feet of all impact areas must be conducted to determine the presence/absence of protected migratory birds and active nests. The avian nesting survey shall be performed by a qualified wildlife biologist within 72 hours prior to the start of construction in accordance with the Migratory Bird Treaty Act and Califo rnia Fish and Game Code Sections 3503, 3503.5, and 3513. If an active bird nest is found, the nest shall be flagged and mapped on the construction plans along with an appropriate buffer established around the nest, which will be determined by the biologist based on the species’ sensitivity to disturbance (typically 300 feet for passerines and 500 feet for raptors and special-status species). The nest area shall be avoided until the nest is vacated and the juveniles have fledged. The nest area shall be demarcated in the field with flagging and stakes or construction fencing.

On-site construction monitoring shall also be conducted when construction occurs in close proximity to an active nest buffer. No Project activities may encroach into established buffers without the consent of a monitoring biologist. The buffer shall remain in place until is determined the nestlings have fledged and the nest is no longer considered active.

MM BIO-10: Pre-construction Surveys for Burrowing Owl. One pre-construction burrowing owl survey shall be completed no more than 14 days before initiation of site preparation or grading activities, If ground -disturbing activities are delayed or suspended for more than 30 days after the pre-construction surveys, the Project site shall be resurveyed. Surveys for burrowing owl shall be conducted in accordance with protocols established in the Staff Report on Burrowing Owl Mitigation (prepared by the California Department of Fish and Game [now California Department of Fish and Wildlife] in 2012) or current version.

If burrowing owls are detected, the Burrowing Owl Relocation Plan shall be implemented in consultation with the California Department of Fish and Wildlife (CDFW). As required by the Burrowing Owl Relocation Plan, disturbance to burrows shall be avoided during the nesting season (February 1 through August 31). Buffers will be established around occupied burrows in accordance with guidance provided in the Staff Report on Burrowing Owl Mitigation or current version. N o Project activities shall be allowed to encroach into established buffers without the consent of a monitoring biologist. The buffer shall remain in place until it is determined that occupied burrows have been vacated or the nesting season has completed.

Outside of the nesting season, passive owl relocation techniques approved by CDFW shall be implemented. Owls shall be excluded from burrows in the immediate Project area and within a buffer zone by installing one -way doors in burrow entrances. These doors will be placed at least 48 hours prior to ground -disturbing activities. The Project area shall be monitored daily for one week to confirm owl departure from burrows prior to any ground -disturbing activities. Compensatory mitigation for permanent loss of ow l habitat will be provided following the guidance in the Staff Report on Burrowing Owl Mitigation or current version.

Where possible, burrows will be excavated using hand tools and refilled to prevent reoccupation. Sections of flexible plastic pipe shall be inserted into the tunnels during excavation to maintain an escape route for any wildlife inside the burrow.

Page 151 ends

KISS Logistics Center Project

City of Hesperia 24
Findings of Fact
December 2023
MM BIO-11: Pre-construction Surveys for Crotch Bumble Bee. In the event that grading starts between April and August, a pre -construction survey for Crotch bumble bee shall be conducted by a qualified biologist within the construction area during the primary flight period (April through August) prior to the start of construction activities. The survey shall ensure that no nests for Crotch bumble be e are located within the construction area. Crotch bumble bee is a habitat generalist, ground - nesting bee. For the purposes of this mitigation measure, nest resources are defined as small mammal burrows, bunch grasses with a duff layer, thatch, hollow trees, rock walls, and brush piles.

On June 6, 2023, the California Department of Fish and Wildlife (CDFW) released the “Survey Considerations for California Endangered Species Act (CESA) Candidate Bumble Bee Species”. The pre -construction survey shall follo w the guidance included within “Survey Considerations for California Endangered Species Act (CESA) Candidate Bumble Bee Species”.

If nest resources occupied by Crotch bumble bee are detected within the construction area, no construction activities shall occur within 100 feet of the construction zone, or as determined by a qualified biologist through evaluation of topographic features or distribution of floral resources. The nest resources will be avoided for the duration of the Crotch bumble bee nesting period (February 1 through October 31).

If the above measures are followed, it is assumed that the Project shall not need to obtain authorization from CDFW through the California Endangered Species Act ITP process.

If the nest resources cannot be avoid ed, as outlined in this measure, the project applicant will consult with CDFW regarding the need to obtain an ITP. Any measures determined to be necessary through the ITP process to offset impacts to Crotch bumble bee may supersede measures provided in thi s CEQA document and shall be incorporated into the habitat mitigation and monitoring plan. In the event an ITP is needed, mitigation for direct impacts to Crotch bumble bee will be fulfilled through compensatory mitigation at a minimum 1:1 nesting habitat replacement of equal or better functions and values to those impacted by the Project, or as otherwise determined through the ITP process. Mitigation will be accomplished either through off-site conservation or through a CDFW-approved mitigation bank.

MM BIO-12: Lighting. Lighting for construction activities and operations within 50 feet of the outside edge of the impact footprint containing habitat for special -status wildlife will be directed away from natural areas.

MM BIO-13: Invasive Plant Management. To reduce the spread of invasive plant species, landscape plants within 200 feet of native vegetation communities shall not be on the most recent version of the California Invasive Plant Council’s Inventory of Invasive Plants (http://www.cal-ipc.org/ip/inventory/index.php). Post-construction, the Project applicant shall continually remove invasive plant species on site by hand or mechanical methods, as feasible.

Page 152 ends

KISS Logistics Center Project

City of Hesperia 25
Findings of Fact
December 2023

6.1.2 ADVERSE IMPACTS ON RIPARIAN HABITAT/SENSITIVE NATURAL

COMMUNITIES
Impact Finding: The Project would not have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service (Draft EIR Page 5.3-21).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measure BIO-1 and Mitigation Measure BIO-2.

Facts in Support of Finding: Six vegetation communities were mapped within the BSA (includes the Project site, offsite improvement area, and a 100 -foot buffer), including 22.4 acres of Desert Almond -Mexican Bladdersage Scrub, 32.7 acres of Joshua Tree Woodland, 0.1 acre of California Buckwheat Scrub, and 0.7 acres of disturbed habitat (see Figure 5.3 -1). State rankings of 1, 2, or 3 are considered high priority for inventory or special -status and impacts to these communities typica lly require mitigation Joshua Tree Woodland is ranked as S3, or “vulnerable to extirpation or extinction”, by the California Natural Community List. All other communities listed are ranked as S4 or S5, or unranked, which are not considered sensitive vegetation communities.

The Project would result in the disturbance of 29.5-acre within the Project site and 1.3 acres of off-site area.

Biological research and site surveys conducted for the Project identified six vegetation communities BSA (and 100-foot buffer around the Project site), including 22.4 acres of Desert Almond-Mexican Bladdersage Scrub,

29.6 acres of Joshua Tree Woodland, 0.1 acre of California Buckwheat Scrub, and 0.7 acres of disturbed habitat. State rankings of 1, 2, or 3 are considered high priority for inventory or special-status and impacts to these communities typically require mitigation Joshua Tree Woodland is ranked as S3, or “vulnerable to extirpation or extinction”, by the California Natural Community List. All other communities listed are ranked as S4 or S5, or unranked, which are not considered sensitive vegetation communities.

All ground-disturbing activities are considered permanent impacts to Joshua tree woodland. The Project would result in permanent impacts to 9.5 acres of the 32.7 total acres of Joshua tree woodland within the BSA. The Project would also result in permanent impacts to 27.3 acres of vegetation communities and land cover types that are not considered sensitive by CDFW, including desert almond —Mexican bladdersage scrub, California buckwheat scrub, and disturbed habitat.

The impacted 248 trees would require mitigation pursuant to CESA and/or the Western Joshua Tree Conservation Act. Mitigation for direct impacts to 248 western Joshua tree individuals will also mitigate for impacts to 9.5 acres of Joshua tree woodland. As required by MM BIO-2 (Conservation of Western Joshua Tree Lands), mitigation for direct impacts to 248 western Joshua trees will be fulfilled through conservation of Western Joshua tree through purchas e of credits at a CDFW -approved mitigation bank or other conservation mechanism approved by the City of Hesperia and CDFW. Conservation efforts for western Joshua tree will focus on the conservation of large, interconnected Joshua tree woodlands on lands w here edge effects are limited, versus lands in urban settings that are subject to habitat fragmentation and edge effects, such as the Project site. Thus, mitigation for impacts to western Joshua tree will also mitigate for impacts to 9.5 acres of Joshua tree woodland.

Implementation of MM BIO-1 (Relocation of Desert Native Plants) and MM BIO-2 (Conservation of Western Joshua Tree Lands) would reduce potential impacts to sensitive vegetation communities (i.e., Joshua tree woodland) to less than significant.

MITIGATION MEASURES
MM BIO-1: Relocation of Desert Native Plants (Hesperia Municipal Code Chapter 16.24) (previously listed – satisfied by MM BIO-2)

Page 153 ends

KISS Logistics Center Project

City of Hesperia 26
Findings of Fact
December 2023
MM BIO-2: Conservation of Western Joshua Tree Lands (CESA) (previously listed)

6.1.3 ADVERSE IMPACTS ON WILDLIFE MOVEMENT
Impact Finding: The Project would not interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors or impede the use of native wildlife nursery sites (Draft EIR Page 5.3-22).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measures BIO-9 and BIO-13.

Facts in Support of Finding: No wildlife corridors exist on the Project site; however, the Project site contains ornamental trees that could be used by songbirds or raptors protected under the Federal Migratory Bird Treaty Act and Sections 3503, 3503.5, and 3513 of the California Fish and Game Code. Therefore, impacts related to nesting birds could occur if site development activities are during the avian breeding season (typically February 1 through September 15). Any activities that occur during the nesting/breeding season of birds protected by the federal Migratory Bird Treaty Act (MBTA), could result in a potentially significant impact if requirements of the MBTA are not followed. Implementation of Mitigation Measure BIO -9 would ensure MTBA compliance and would require a nesting bir d survey to be conducted prior to the commencement of construction during nesting season, which would reduce potential impacts related to nesting avian species and native wildlife nursery sites to a less than significant level.

Potential long -term (post-construction) indirect impacts from operations and maintenance activities could disrupt wildlife movement around the Project due to increased lighting from buildings. MM BIO-12 (Lighting) would ensure all lighting during operations, and within 50 feet of the outside edge of the impact footprint containing habitat for special-status wildlife, would be directed away from natural areas.

Therefore, the Project with implementation of MM BIO -9 and MM BIO -12, the Project would result in less than significant impacts with mitigation on the movement of native resident, migratory fish, or wildlife species.

MITIGATION MEASURES
MM BIO-9: Pre-construction Nesting Bird Survey (previously listed) MM BIO-12: Lighting (previously listed)

6.1.4 CONFLICT WITH BIOLOGICAL RESOURCES PROTECTION POLICIES AND

ORDINANCES
Impact Finding: The Project would not conflict with any local policies or ordinances protecting biological resources, such as a tree preservation ordinance (Draft EIR Page 5.3-23).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measure BIO-2.

Facts in Support of Finding: Pursuant to the City of Hesperia Municipal Code chapter 16.24, Protected Plants, all species of the Agavaceae family (Yuccas, Nolinas, Century Plants.), all species of cactus, including chollas (Cylindropuntia spp.), smoketree (Dalea spinosa), all species of the mesquites (Prosopis), creosote rings 10 feet or more in diameter, all Joshua trees, and all plants protected or regulated by the California Desert Native Plants Act (California Food and Agricultural Code 80001 et. seq.) shall not be removed except under a removal permit issued by the agricultural commissioner. The Project site includes 248 Joshua trees within the Project site. As a listed species under CESA, the Project applicant would be required to obtain an ITP under Section 2081 of the Fish and Game Code (MM BIO -2). Additionally, the applicant will apply for mitigation land credits from a CDFW-approved mitigation bank established to protect Joshua trees or pay

Page 154 ends

KISS Logistics Center Project

City of Hesperia 27
Findings of Fact
December 2023
fees according to the Western Joshua Tree Conservation Act at a minimum of a 1:1 ratio of equal or better function.

Project construction would necessitate completion of a native plant removal permit applica tion for the removal of existing Joshua trees from the Project site. The City requires a detailed plan for the removal of all protected plants on the Project site to be prepared with the application (Mitigation Measure BIO -1).

However, per City policy, obtainment of an Incidental Take Permit and corresponding mitigation under the jurisdiction of CDFW would satisfy the City’s requirements under Chapter 16.24 of the City Municipal Code.

Therefore, the Project’s potential to conflict with local policies or ordinances protecting biological resources would be less than significant with mitigation incorporated.

MITIGATION MEASURES
MM BIO-1: Relocation of Desert Native Plants (Hesperia Municipal Code Chapter 16.24) (previously listed – satisfied by MM BIO-2)
MM BIO-2: Conservation of Western Joshua Tree Lands (CESA) (previously listed)

6.1.5 CUMULATIVE BIOLOGICAL RESOURCE IMPACTS
Impact Finding: The Project would not result in cumulative impacts to biological resources with mitigation (Draft EIR 5.3-23).

Facts in Support of Finding:

The cumulative study area for purposes of biological resources would be the area surrounding the Project site, as well as the larger City of Hesperia. This cumulative impact analysis for biological resources considers development of the proposed Project in conjunction with other development projects as well as the projects identified in Section 5.0, Environmental Impact Analysis, Table 5 -1, Cumulative Projects. Projects identified in Table 5-1 are proposed adjacent to the Project site and within the larger Hesperia area.

Special-Status Species.

The Project could result in impacts to burrowing owls, Loggerhead shrike, Le Conte’s thrasher, and Joshua trees. Joshua tree woodlands are considered a sensitive natural community by CDFW (CDFW 2020).

As required by MM BIO-2, mitigation for direct impacts to 9.5 acres of western Joshua trees will be fulfilled through purchase of credits at a CDFW -approved mitigation bank or payment of in -lieu fees per the Western Joshua Tree Conservation Act, as approved by the City of Hesperia and CDFW.

Additionally, the Project could result in potentially significant impacts on burrowing owls, Loggerhead shrike, Le Conte’s thrasher through the loss of suitable habitat and degradation of suitable habitat surrounding the Project site. Implementation of MM BIO -3 (Compliance Monitoring), MM BIO-4 (Education Program), MM BIO-5 (Construction Monitoring Notebook), MM BIO -7 (Hazardous Waste), MM BIO -9 (Preconstruction Nesting Bird Surveys and Avoidance), MM BIO-12 (Lighting), and MM BIO-13 (Invasive Plant Management) would reduce potential construction impacts to loggerhead shrike, LeConte’s thrasher, and burrowing owl to less than significant. Implementation of MM BIO-2 (Conservation of Western Joshua Tree Lands), MM BIO-9 (Pre-construction Nesting Bird Surveys and Avoidance), MM BIO-12, and MM BIO-13 would reduce potential operational impacts to less than significant. Additionally, MM BIO-10 (Pre-construction Surveys for Burrowing Owl) would be implemented to reduce potential operational impacts to burrowing owl to less than significant and MM BIO-11 (Pre-construction Surveys for Crotch Bumble Bee) would be implemented to reduce potential operations impacts to Crotch bumble bee to less than significant.

Page 155 ends

KISS Logistics Center Project

City of Hesperia 28
Findings of Fact
December 2023
The less than significant impacts, with MM BIO -1 through BIO-13, from the Project are not anti cipated to combine with other development projects to substantially affect these species to a point where their survival in the region is threatened. Mitigation implemented for the Project would ensure the adequate preservation and/or replacement of specia l status species and habitat, so to not diminish the larger population and regional habitat availability. Therefore, Project impacts would not be cumulatively considerable.

Sensitive Habitat.

The Project site is currently undeveloped and does not contain any riparian habitat or jurisdictional waters.

Therefore, cumulative impacts related to riparian habitat and jurisdictional waters would be less than cumulatively significant.

The Project would result in permanent impacts to 9.5 acres of Joshua tree woodla nd. Mitigation for direct impacts to 248 western Joshua tree individuals will also mitigate for impacts to 9.5 acres of Joshua tree woodland. In the event that western Joshua trees remain listed as a Candidate species or are elevated to “Threatened” status, as required by MM BIO-2 (Conservation of Western Joshua Tree Lands), mitigation for direct impacts to 248 western Joshua trees will be fulfilled through conservation of Western Joshua tree through purchase of credits at a CDFW -approved mitigation bank or other conservation mechanism approved by the City of Hesperia and CDFW. Conservation efforts for western Joshua tree will focus on the conservation of large, interconnected Joshua tree woodlands on lands where edge effects are limited, versus lands in urban settings that are subject to habitat fragmentation and edge effects, such as the Project site.

Thus, mitigation for impacts to western Joshua tree will also mitigate for impacts to 9.5 acres of Joshua tree woodland. In the event that western Joshua trees are delisted as a Candidate threatened species, the Hesperia Municipal Code Chapter 16.24 would apply, which would require the development and implementation of a desert native plants relocation plan to plan for the removal and replacement of impacted Joshua trees (MM BIO -1). The less than significant impacts, with implementation of MM BIO -1 and/or MM BIO -2, from the Project are not anticipated to combine with other development projects to substantially affect this sensitive habitat to a point where availability in the region is substantially diminished.

Therefore, Project impacts would not be cumulatively considerable.

Nesting and Migratory Birds.

Mitigation is included to avoid impacts to nesting bird species through compliance with the Migratory Bird Treaty Act. As described above, the Project site contains trees and shrubs that can support nesting songbirds or raptors protected under the Federal Migratory Bird Treaty Act and Sections 3503, 3503.5, and 3513 of the California Fish and Game Code during the nesting season . The less than significant impacts, with MM BIO-9, from the Project are not anticipated to com bine with other development projects to substantially affect these species to a point where their survival in the region is threatened. Therefore, Project impacts would not be cumulatively considerable.

Ordinances/Adopted Conservation Plans.

The City Munic ipal Code chapter 16.24, Protected Plants, all species of the Agavaceae family (Yuccas, Nolinas, Century Plants.), all species of cactus, including chollas (Cylindropuntia spp.), smoketree (Dalea spinosa), all species of the mesquites (Prosopis), creosote rings 10 feet or more in diameter, all Joshua trees, and all plants protected or regulated by the California Desert Native Plants Act (California Food and Agricultural Code 80001 et. seq.) shall not be removed except under a removal permit issued by the agricultural commissioner. The Project would result in the removal of Joshua trees from the site. All past, current, and probable future projects, including the proposed Project, would be required to comply with the City’s native plant ordinance and provide preservation/mitigation as determined by the City. The less than significant impacts, with implementation of MM BIO-1, from the Project are not anticipated to combine with

Page 156 ends

KISS Logistics Center Project

City of Hesperia 29
Findings of Fact
December 2023
other development projects to substantially affect these species to a point where their survival in the region is threatened. Therefore, Project impacts would not be cumulatively considerable.

Cumulatively considerable impacts to these limited biological resources would not occur from implementation of the proposed Project with implementation of Mitigation Measures BIO-1 through BIO-13.

MITIGATION MEASURES
MM BIO-1 through BIO-13: As previously listed.

6.2 CULTURAL RESOURCES

6.2.1 ARCHAEOLOGICAL RESOURCES
Impact Finding: The Project would not cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5 (Draft EIR Page 5.4-7).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Plans, Programs, Policies (PPP) CUL-1and Mitigation Measure CUL-1.

Facts in Support of Finding: The records search conducted for the Project revealed 53 previously recorded resources (two prehistoric and 51 historic) within one mile of the Project site. None of the 53 resources were identified as being within the Project site. The prehistoric resources consist of a lithic scatter and a single isolate. The historic resources consist of nine roads, one highway, various segments of the Spanish Trail, a transmission line, one residence, one homestead property, 25 trash scatters, and 12 isolates. The site is vacant and undeveloped with the exception of a dirt road, Caliente Road, which bisects the site from northeast to southwest and a manhole located in the southeast portion of the site. Additionally, the 1902 Hesperia USGS map indicates that the Project site is located adjacent to the west bank of the Oro Grande Wash.

During the field visit, no evidence of any historic or prehistoric cultural resources was identified within the Project site; however, ground visibility at the time of the survey was poor, with only 50 percent of the Project site visible due to vegetation, which affected the potential to discover any surface scatters of artifacts.

Additionally, the City of Hesperia General Plan Update EIR identifies the Project si te as within an area of “medium sensitivity” for the presence of cultural resources (City of Hesperia 2010). As a result, Mitigation Measure CUL-1 is included which requires archaeological monitoring during all ground-disturbance activities, Mitigation Measure CUL-1 also includes procedures to follow in the event a potential resource is uncovered, including that work must be halted within 60 feet of the find in the event that a resource is inadvertently discovered during ground -disturbing activities, and re quiring coordination with the Yuhaaviatam of San Manuel Nation if significant pre -contact and/or historic -era cultural resources are discovered. Thus, with implementation of Mitigation Measure CUL-1, potential impacts related to archaeological resources wo uld be reduced to a less than significant level.

MITIGATION MEASURES
MM CUL-1: Archaeological Monitoring. Prior to the issuance of the first grading permit, the applicant shall provide a letter to the City Planning Division, or designee, from a qualified professional archeologist meeting the Secretary of Interior’s Professional Qualifications for Archaeology as defined at 36 CFR Part 61, Appendix A, stating that qualified archeologists have been retained and will be present at pre -grade meetings and for all initial ground disturbing activities, up to five feet in depth.

In the event that a resource is inadvertently discovered during ground -disturbing activities, work must be halted within 60 feet of the find until it can be evaluated

Page 157 ends

KISS Logistics Center Project

City of Hesperia 30
Findings of Fact
December 2023
by the qualified archaeologist. Construction activities could continue in other areas.

If the find is considered a “resource” the archaeologist shall pursue either protection in place or recovery, salvage, and treatment of the deposits. Recovery, salvage, and treatment protocol s shall be developed in accordance with applicable provisions of Public Resource Code Section 21083.2 and State CEQA Guidelines 15064.5 and 15126.4 in consultation with the City. Per CEQA Guidelines Section 15126.4(b)(3), preservation in place shall be the preferred means to avoid impacts to archaeological resources qualifying as historical resources. Consistent with CEQA Guidelines Section 15126.4(b)(3)(C), if unique archaeological resources cannot be preserved in place or left in an undisturbed state, recovery, salvage, and treatment shall be required at the developer/applicant’s expense. If significant pre -contact and/or historic-era cultural resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the drafts of which shall be provided to Yuhaaviatam of San Manuel Nation (YSMN) for review and comment, as detailed within TCR -1. The archaeologist shall monitor the remainder of the project and implement the Plan accordingly.

6.2.2 CUMULATIVE CULTURAL RESOURCE IMPACTS
Impact Finding: The Project would not result in cumulative impacts to cultural resources. (Draft EIR Page 5.4- 8).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measure CUL-1.

Facts in Support of Finding:

Historic Resources: The Project’s contribution to cumulative impacts to historical resources was analyzed in context with past projects in southwestern San Bernardino County that were once similarly influenced by the historical agricultural industry in the region. Record searches and field surveys indicate the absence of significant historical resources within the Project site. Thus, the Project would not generate pot entially significant impacts that would have the potential to combine and then become cumulatively significant.

Therefore, the Project would result in a less than significant cumulatively considerable impact related to historic resources.

Archaeological Resources: The Project’s impact to prehistoric archaeological resources was analyzed in the context of past projects in the southwestern San Bernardino County region, which is identified as sensitive for archaeological resources. Construction activities within the Project site – as with other development projects in the region – may uncover subsurface prehistoric archaeological resources that meet the CEQA Guidelines section 15064.5 definition. However, Mitigation Measure CUL-1 has been included to reduce the potential impacts to uncovering unknown resources during Project construction, which would reduce potential impacts to a less than significant level.

Additionally, the Project would comply with Policy CN 5.3, which states that all historical, paleontological, and cultural resources discovered shall be inventoried and evaluated according to CEQA regulations and the California Office of Historic Preservation. Therefore, the Project would not generate potentially significant impacts that would have the potential to combine and then become cumulatively significant. Thus, the Project would result in a less than significant cumulatively considerable impact related to archaeological resources.

Page 158 ends

KISS Logistics Center Project

City of Hesperia 31
Findings of Fact
December 2023

6.3 GEOLOGY AND SOILS

6.3.1 SEISMIC-RELATED GROUND FAILURE
Impact Finding: The Project would not directly or indirectly cause potential substantial adverse effects, including the risk of loss injury, or death involving seismic-related ground failure, including liquefaction (Draft EIR Page 5.6-11).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measure GEO-1.

Facts in Support of Finding:

Liquefaction occurs when vibrations or water pressure causes soil particles to lose its friction properties. As a result, soil behaves like a liquid, has an inability to support weight, and can flow down very gentle slopes.

This condition is usually temporary and is most often caused by an earthquake vibrating water-saturated fill or unconsolidated soil. However, effec ts of liquefaction can include sand boils, settlement, and structural foundation failures. Soils that are most susceptible to liquefaction are clean, loose, saturated, and uniformly graded fine-grained sands in areas where the groundwater table is within a pproximately 50 feet below ground surface.

The Geotechnical Investigation completed for the Project did not encounter groundwater during its subsurface exploration and estimates that groundwater depths are several hundred feet below ground surface ( bgs) (AGS 2022). Therefore, the Geotechnical Investigation concluded that the Project site is not susceptible to liquefaction. However, all structures built in the City are required to be developed in compliance with the CBC (California Code of Regulations, Title 24, Part 2), which is adopted as City of Hesperia Municipal Code Chapter 15.04. Compliance with the CBC would require proper construction of building footings and foundations so that it would withstand the effects of potential ground movement, including l iquefaction.

Furthermore, the Geotechnical Investigation prepared for the Project includes recommendations for grading and foundation strength that would ensure that the Project would be consistent with CBC requirements for reducing risk related to liquefaction. Therefore, Mitigation Measure GEO-1 has been incorporated into the Project to require that the Project follow the recommendations included the Geotechnical Investigation.

The City of Hesperia Building and Safety Department reviews structural plans and geotechnical data prior to issuance of a grading permit and conducts inspections during construction, which would ensure that all required CBC measures are incorporated. Compliance with the CBC as included as a condition of approval and verified by the City’s review process would ensure that impacts related to liquefaction are less than significant. Therefore, with implementation of Mitigation Measure GEO -1 and compliance with the CBC as verified by City review, impacts related to seismic related ground failure including liquefaction would be less than significant.

MITIGATION MEASURES
MM GEO-1: Incorporation of and Compliance with the Recommendations in the Geotechnical Investigation. Prior to issuance of grading and building permits, the Hesperia Buildi ng Department shall verify all recommendations included in the Geotechnical Investigation prepared for the project by Advanced Geotechnical Solutions, Inc., in March 2022 are incorporated into all design and engineering plans including, but not limited to site preparation, grading, fill placement, foundations, pavement design, seismic design, etc.

Page 159 ends

KISS Logistics Center Project

City of Hesperia 32
Findings of Fact
December 2023

6.3.2 UNSTABLE GEOLOGICAL UNIT OR SOIL
Impact Finding: The Project would not be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on - or off -site landslide, lateral spreading, subsidence, liquefaction, or collapse (Draft EIR Page 5.6-13).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measure GEO-1.

Facts in Support of Finding: The Project site and the adjacent parcels are relatively flat and do not contain any hills or steep slopes. Therefore, impacts related to landslides or rock falls would not occur from implementation of the proposed Project.

Groundwater was not encountered during subsurface exploration conducted as part of the Geotechnical Investigation and is estimated to exist as depths several hundred feet below ground surface. Due to the absence of grou ndwater and dense nature of the underlying older alluvium, the potential for seismically induced liquefaction is anticipated to be very low. The Geotechnical Investigation concluded that since the site is fairly flat and the potential for liquefaction is l ow, the potential for lateral spreading is also low. In addition, the Project would be required to adhere to California Building Code (CBC) requirements to limit risk associated with lateral spreading. As such, compliance with CBC requirements, as ensured through the City’s permitting process, would ensure that lateral spreading and liquefaction impacts would be less than significant.

According to the Geotechnical Investigation, subsidence was not detected within the Project site during a recent USGS study period between 2014 and 2019. Additionally, risk of subsidence would be lowered through adherence to CBC grading and earthwork operation recommendations. Compliance with the CBC would be required by the Hesperia Building and Safety Division, as implemented as a condition of approval.

The Geotechnical Investigation performed consolidation testing in order to measure the collapse potential of the Project site soils. Based on the results of consolidation testing, site soils were found to have a slight to moderate potential for collapse. The Geotechnical Investigation describes that the recommended removal and recompaction during site grading would reduce impacts related to collapse (AGS 2022). Therefore, Mitigation Measure GEO -1 has been incorporated into the P roject to require that the Project follow the recommendations included in the Geotechnical Investigation. Thus, with implementation of Mitigation Measure GEO-1 any potential impacts related to collapsible soils would be minimized to a less than significant level.

As such, excavation and recompaction of the artificial fill soils in compliance with the CBC as required through the City’s permitting process would ensure that collapse related impacts would be less than significant.

MITIGATION MEASURES
MM GEO-1: Incorporation of and Compliance with the Recommendations in the Geotechnical Investigation. As previously listed.

6.3.3 PALEONTOLOGICAL RESOURCES
Impact Finding: The Project would not directly or indirectly destroy a unique paleontological resource or site or unique geologic feature (Draft EIR Page 5.6-15).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of Mitigation Measure PAL-1.

Facts in Support of Finding: The Paleontological Assessment prepared for the Project did not identify the presence of known fossil localities within the Project site. However, it did identify previously recorded fossil localities within 2.5 miles of the site and within the greater Victorv ille area. Additionally, the Assessment

Page 160 ends

KISS Logistics Center Project

City of Hesperia 33
Findings of Fact
December 2023
identified that the Project site is underlain by Holocene deposits that have a low potential to contain paleontological resources, while the underlying Pleistocene -aged alluvial fan deposits may be considered to have an undetermined to high potential to yield paleontological resources.

As such, the potential for encountering significant paleontological resources within the Project site is considered high due to the presence of potentially fossiliferous Pleistocene -aged alluvial fan deposits that are likely present in the shallow subsurface of the Project, and the known occurrence of significant terrestrial vertebrate fossils at shallow depths from the Pleistocene deposits in the vicinity of the Project. As such, Mitigation Measure PAL -1 shall be implemented as part of the Project to require preparation of a Paleontological Resources Management Plan (PRMP) prior to construction activities. Implementation of Mitigation Measure PAL-1 would ensure that any potential impacts to undiscovered paleontological resources would not be impacted by the Project.

MITIGATION MEASURES
MM PAL-1: Paleontological Resource Management Plan. Prior to the start of construction, a Paleontological Resources Management Plan (PRMP) shall be prepar ed by a qualified Paleontologist and include the following procedures:
• Monitoring of mass grading and excavation activities in areas identified as likely to contain paleontological resources shall be performed by a qualified paleontologist or paleontologi cal monitor. Starting at the surface, monitoring will be conducted fulltime in areas of grading or excavation in undisturbed alluvial deposits.
• Development of an inadvertent discovery plan to expediently address treatment of paleontological resources shou ld any be encountered during development associated with the Project. If these resources are inadvertently discovered during ground-disturbing activities, work must be halted within 50 feet of the find until it can be evaluated by a qualified paleontologis t.

Construction activities could continue in other areas. If the discovery proves to be significant, additional work, such as fossil collection and curation, may be warranted and would be discussed in consultation with the appropriate regulatory agency(ies).

6.3.4 CUMULATIVE PALEONTOLOGICAL RESOURCE IMPACTS
Paleontological Resources: The geographic area of potential cumulative impacts related to paleontological resources includes areas that are underlain by similar geologic units from the same time period. A cumulative impact could occur if development projects incrementally result in the loss of the same types of unique paleontological resources. The southwestern San Bernardino County Region, including the Project site, is underlain by deep sediments that are sensitive to paleontological resources. However, with incorporation of Mitigation Measure PAL-1 and compliance with Policy CN 5.3, which states that all historical, paleontological, and cultural resources discovered shall be inventoried and evaluated accordi ng to CEQA regulations and the California Office of Historic Preservation, the potential for cumulatively considerable impacts to paleontological resources would be reduced to a less than significant level.

6.4 TRIBAL CULTURAL RESOURCES

6.4.1 REGISTER OF HISTORICAL RESOURCES
Impact Finding: The Project would not cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or

Page 161 ends

KISS Logistics Center Project

City of Hesperia 34
Findings of Fact
December 2023
object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local regist er of historical resources as defined in Public Resources Code section 5020.1(k) (Draft EIR Page 5.13-4).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of PPP TCR-1, PPP CUL-1, Mitigation Measure TCR-1, Mitigation Measure TCR-2, Mitigation Measure CUL- 1, and Mitigation Measure 6 from the MSFCSP EIR.

Facts in Support of Finding: On September 13, 2022, the NAHC responded with a list of Native American tribes and that the SLF search yielded negati ve results for known tribal cultural resources or sacred lands within a 1-mile radius of the Project site. To identify if any tribal cultural resources are potentially located within the Project site, the City sent notices on September 8, 2022, regarding t he Project to the Native American tribes provided by the NAHC.

One response was received from the Yuhaaviatam of San Manuel Nation (YSMN) (formerly known as the San Manuel Band of Mission Indians) on January 10, 2023. YSMN stated the Project site is locat ed within Serrano ancestral territory and is therefore of interest to the Tribe. However, the Tribe stated they had no issue with implementation of the Project and did not request consultation. The letter included a series of mitigation measures to be incorporated into the Project.

Based on literature review (i.e., records check and archival research) and pedestrian surveys, no prehistoric resource sites or isolates —including a historic TCR —as defined by PRC Section 5020.1(k) have been identified within the Project site. As discussed in Section 5.4, Cultural Resources, the potential for encountering archaeological resources, including TCR’s, within the Project site is considered moderate due to the site’s proximity of the Project to a freshwater resource (the Oro Grande Wash, adjacent to the east), the high frequency of historic and prehistoric cultural resources identified within one mile of the site and based upon the limited visibility during the pedestrian survey.

Construction of the proposed Project would include earthmoving activ ities, such as grading, which have the potential to disturb previously unknown tribal cultural resources. As a result, Mitigation Measure CUL -1 is included (as detailed in the Draft EIR Section 5.4, Cultural Resources ) which requires that a qualified archeologist be retained and present at pre -grade meetings, as well as for all initial ground disturbing activities, such as site preparation, up to five feet in depth, in order to quickly assess the potential for discoveries of archaeological resources during construction. The Main Street and Freeway Corridor Specific Plan (MSFCSP) Final Environmental Impact Report (EIR) included Mitigation Measure 6, which requires the landowner to relinquish ownership of all cultural resources, including sacred items, burial goods and all archaeological artifacts that are found on the Project site to the appropriate Tribe for proper treatment and disposition.

The Project would include implementation of PPP TRC -1, which requires that descendants be notified when Native American human remains are discovered and provide for treatment and disposition of human remains and associated grave goods; PPP CUL-1, which complies with State Health and Safety Code Section 7050.5, which states that no further disturbance may occur in the vicin ity of the body until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98.

Mitigation Measure CUL -1, TCR-1, TCR-2, and Mitigation Measure 6 from the MSFCSP EIR, requiring the landowner to relinquish ownership of all cultural resources found on the Project site to the appropriate Tribe for proper treatment and disposition, would ensure that potential impacts a result o f the inadvertent discovery of tribal cultural resources would be less than significant.

Page 162 ends

KISS Logistics Center Project

City of Hesperia 35
Findings of Fact
December 2023

REGULATORY REQUIREMENTS
PPP TCR-1: Native American historical and cultural resources and sacred sites are protected under PRC Sections 5097.9 to 5097.991, which requir e that descendants be notified when Native American human remains are discovered and provide for treatment and disposition of human remains and associated grave goods.

PPP CUL-1: As previously listed.

MITIGATION MEASURES
MM CUL-1: As listed previously.

MM TCR-1: The Yuhaaviatam of San Manuel Nation Cultural Resources Department (YSMN) shall be contacted, as detailed in Mitigation Measure CUL -1, of any pre -contact and/or historic-era cultural resources discovered during project implementation and be provided information regarding the nature of the find, so as to provide Tribal input with regards to significance and treatment. Should the find be deemed significant, as defined by CEQA (as amended, 2015), a cultural resources Monitoring and Treatment Plan shall be created by the archaeologist, in coordination with YSMN, and all subsequent finds shall be subject to this Plan. This Plan shall allow for a monitor to be present that represents YSMN for the remainder of the project, should YSMN elect to place a monitor on-site.

MM TCR-2: Any and all archaeological/cultural documents created as a part of the project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the applicant and Lead Agency for dissemination to YSMN. The Le ad Agency and/or applicant shall, in good faith, consult with YSMN throughout the life of the project.

Main Street and Freeway Corridor Specific Plan Final Environmental Impact Report Mitigation included the following applicable mitigation measure:

MSFCSP EIR MM 6: The landowner will relinquish ownership of all cultural resources, including sacred items, burial goods and all archaeological artifacts that are found on the project area to the appropriate Tribe for proper treatment and disposition.

6.4.2 PUBLIC RESOURCE CODE SECTION 5024.1
Impact Finding: The Project would not cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, c ultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, that considers the significance of the resource to a California Native American tribe (Draft EIR 5.13-6).

The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of PPP TCR-1, PPP CUL-1, Mitigation Measure TCR-1, Mitigation Measure TCR-2, Mitigation Measure CUL- 1, and Mitigation Measure 6 from the MSFCSP EIR.

Facts in Support of Finding: As discussed previously, no known tribal cultural resources were identified within the Project site by the Cultural Resources Assessment (Appendix D). Additionally, as part of the City’s AB 52 consultation process, the City reach ed out to Native American tribes who may have knowledge of tribal

Page 163 ends

KISS Logistics Center Project

City of Hesperia 36
Findings of Fact
December 2023
cultural resources within the Project area. No known tribal cultural resources or sensitive sites were identified within the Project site during the AB 52 consultation process.

However, construction of the proposed Project would require ground disturbing activities that could result in the excavation of soils up to seven feet in depth and has the potential to disturb unknown tribal cultural resources on the Project site. California Health and Safety Code Section 7050.5 and CEQA Guidelines 15064.5(e) requires that if human remains are discovered, disturbance to the site shall halt and remain halted until the coroner has conducted an investigation. If the coroner determines that the remains are those of a Native American, he or she shall contact the Native American Heritage Commission by telephone within 24 hours. Although AB 52 consultation did not yield substantial evidence that listed or eligible tribal cultural resources—pursuant to criteria in PCR Section 5024.1(c) — within the Project site, PPP TRC-1, PPP CUL -1, Mitigation Measure CUL -1, TCR -1, TCR -2, and Mitigation Measure 6 from the MSFCSP EIR would be implemented to ensure that potential impacts related to the inadvertent discovery of tribal cultural resources are less than significant.

Furthermore, the Project would be subject to CEQA Guidelines Section 15064.5, PRC Section 21083.2 and 5097.9, and Health and Safety Code Section 7050.5, to properly recover human remains if encountered.

Therefore, with implementation of mitigation and applicable regulations, impacts related to tribal cultural resources would be less than significant.

REGULATORY REQUIREMENTS
PPP TCR-1: As listed previously.

PPP CUL-1: As listed previously.

MITIGATION MEASURES
MM CUL-1: As listed previously.

MM TCR-1: As listed previously.

MM TCR-2: As listed previously.

MM 6: As listed previously.

6.4.3 CUMULATIVE TRIBAL CULTURAL RESOURCES IMPACTS
Impact Finding: The Project would not result in cumulative impacts to tribal cultural resources. (Draft EIR Page

5.13-6)
A. The City hereby makes Finding 1 and determines that this impact is less than significant with implementation of PPP TCR-1, PPP CUL-1, Mitigation Measure TCR-1, Mitigation Measure TCR-2, Mitigation Measure CUL-1, and Mitigation Measure 6 from the MSFCSP EIR.

Facts in Support of Finding: The cumulative study area for tribal cultural resources includes the City of Hesperia, which contains the same general tribal historic setting. Other projects throughout the City that would involve ground disturbances could reveal buried tribal cultural resources.

Cumulative impacts to tribal cultural resources would be reduced by compliance with applicable regulations and consultations required by AB 52. As described above, the Project area is not known to contain tribal cultural resources; however, Mitigation Measure CUL -1 and MSFCSP EIR Mitigation Measure 6 would be implemented to ensure that impacts would not occur in the case of an inadvertent discovery of a potential tribal cultural resource. These mitigation measures ensure that the Project would not contribute to a cumulative loss of tribal cultural resources. Therefore, potential cumulative impacts would be less than significant.

Page 164 ends

KISS Logistics Center Project

City of Hesperia 37
Findings of Fact
December 2023

REGULATORY REQUIREMENTS
PPP TCR-1: As listed previously.

PPP CUL-1: As listed previously.

MITIGATION MEASURES
MM CUL-1: As listed previously.

MM TCR-1: As listed previously.

MM TCR-2: As listed previously.

MM 6: As listed previously.

7.0 IMPACTS DETERMINED TO BE LESS THAN

SIGNIFICANT
Based upon the NOP and a review of the Project by the C ity, the City determined that the Project would have no impact or a less than significant impact on the following environmental topic areas and that no further, detailed analysis of these topics was required in the EIR:
• Agriculture & Forestry Resources
• Mineral Resources
• Population and Housing
• Public Services
• Recreation
• Wildfire

The evidence in support of the finding that the Project will not have a significant impact on these environmental topic areas are set forth in the Draft EIR which is incorporated by reference. • Aesthetics
• Air Quality
• Biological Resources
o Wetlands
o Conservation plans
• Cultural Resources
o Historical resources
o Disturbance of human remains
• Energy
• Geology and Soils
o Rupture of a known earthquake fault
o Seismic ground shaking
o Landslides Soil erosion
o Expansive soil
o Septic tanks
• Greenhouse Gas Emissions
o Conflict with an applicable air quality
plan
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Noise
• Population and Housing
• Public Services
• Recreation
• Transportation
o Conflict with applicable circulation plan,
program, ordinance, or policy
o Geometric design features
o Inadequate emergency access
• Utilities and Service Systems
For those environmental impacts that were analyzed in the D raft EIR, the City determined, based upon the CEQA threshold criteria for significance, that the Project would have no impact or a less than significant impact to the following environmental topic areas , and that no mitigation measures were required . This determination is based upon the environmental analysis in the Draft EIR and the comments received on the

Page 165 ends

KISS Logistics Center Project

City of Hesperia 38
Findings of Fact
December 2023
Draft EIR. No substantial evidence was submitted to or identified by the City which indicated that the Project would result in a significant impact related to the following.

7.1 AESTHETICS
Based upon the NOP and a review of the Project by the City, the City determined that the Project would have no impact or a less than significant impact on the following environmental topic areas and that no further, detailed analysis of these topics was required in the EIR:

7.1.1 SCENIC VISTAS
Impact Finding: The Project would not have a substantial adverse effect on a scenic vista (Draft EIR Page

5.1-6).

Facts in Support of Findings: A scenic vista can be impacted in two ways: a development project can have visual impacts by either directly diminishing the scenic quality of the vista, or by blocking the view corridors or “vista” of the scenic resource at public locations. The City of Hesperia General Plan does not specifically identify any scenic vistas from the Project site, roadways adjacent to the Project site, or the Project site vicinity. However, the City’s General Plan generally describes scenic vistas within the City as views of scenic resources, including the Mojave River to the east, the San Bernardino and San Gabriel Mountain ranges to the south, and the surrounding Victor Valley, along with neighboring hillsides and the natural desert environment.

The Project site includes natural desert landscape (Joshua tree woodland and habitat) and provides distant views of the San Bernardino and San Gabriel Mountain ranges. would continue to be available from public vantage points on I -395. Therefore, the Project would not substantially damage scenic resources, obstruct any prominent scenic vista or view open to the public, or result in the creation of an aesthetically offensive site. As such, impacts would be less than significant.

7.1.2 SCENIC RESOURCE DAMAGE WITHIN A STATE SCENIC HIGHWAY Impact Finding: The Project would not substantially damage scenic resources, including but not limited to trees, rock outcroppings, and historic buildings within a state scenic highway (Initial Study Page 28).

Facts in Support of Findings: The Project site is not located within a scenic highway corridor. There are no officially designated State scenic highways adjacent to the Project site. According to the California Department of Transportation (Caltrans), the closest State-eligible scenic highway is a portion of Route 138, located approximately 7 miles south of the Project site. Accordingly, the Project site is not located within a state scenic highway corridor and implementation of the proposed Project would not have a substantial effect on scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway corridor. Therefore, the Project would not result in any impacts to a scenic resource within a state scenic highway, and this topic was not further analyzed in the Draft EIR.

7.1.3 SCENIC QUALITY
Impact Finding: The Project would not conflict with applicable zoning and other regulations governing scenic quality (Draft EIR Page 5.1-5).

Facts in Support of Finding: The Project site is located within an “urbanized area,” as defined by Public Resources Code Section 21071; therefore, the analysis focuses on the Project’s consistency with applicable zoning and other regulations governing scenic quality.

To protect the existing visual resources, the goal of the Urban Design Framework is to develop the MSFC-SP area as a system of spaces, structures, and environments rather than as linear strips of unrelated buildings

Page 166 ends

KISS Logistics Center Project

City of Hesperia 39
Findings of Fact
December 2023
and undefined streetscapes. To protect the MSFC -SP area’s High Desert setting and panoramic mountain views, the MSFC -SP specifies that architectu ral character of new buildings should maximize views of the surrounding landscape while taking inspiration from the surrounding natural elements. As determined by the MSFC-SP EIR, the MSFC-SP encourages good design, and high-quality development by recommending a set of development and design standards that create the desired aesthetic and high -quality environment.

Through implementation of these design standards, buildout of the MSFC -SP would result in less than significant impacts on the MSFC-SP area visual character and quality.

The Project site contains two industrial zones, namely, Commercial/Industrial Business Park (CIBP), and Neighborhood Commercial (NC). The MSCF-SP would be amended to designate the entire Project site CIBP.

Section II: Private Devel opment, Chapter 9: Non -Residential Zones, includes permitted uses, conditionally permitted uses, and development standards for CIBP. Additionally, the MSFC -SP includes Chapter 11 (Industrial Design Standards and Guidelines), which contains the landscaping, lighting, design, and architectural requirements (scale, mass, materials, etc.) for industrial uses within the MSFC-SP.

The proposed Project would develop the 29.61 -acre vacant site with a new built -to-suit 655,468 SF warehouse. The Project would include various architectural elements such as stamped concrete, stacked stone with textured or sandblasted finishes, glass and curtainwall glazing systems, natural and/or manufactured stone and limited metal panel systems including light and warm-toned exterior building colors. Additionally, the Project’s landscape would incorporate low water need plant species that can maintain vibrancy during drought conditions.

The Project would be consistent with policies identified in the MSFC -SP applicable to visual charac ter and quality. In addition, the Project would be consistent with applicable development standards provided under Section II: Private Development, Chapter 9: Non -Residential Zones, includes permitted uses, conditionally permitted uses, and development standards for CIBP.

Additionally, MSFC-SP Chapter 11 (Industrial Design Standards and Guidelines) contains design guidelines for industrial uses in the MSFC-SP. Guidelines specify site layout, building scaling and massing, building entry design, vehicle and p edestrian circulation, parking and loading area requirements, and more. Earth tones would be used for the proposed building consistent with the MSFC -SP Industrial Design Standards. The use of strong or bright, unnatural colors, including the bright “white-on white” color schemes for exterior stucco, wood siding, trim doors and shutters, is discouraged as earth tones are considered to be the best suited for cohesion with existing City architecture. Further, the MSFC-SP design standards are nonspecific and Project colors and building materials would be reviewed and approved during Development Plan Review by the City which would ensure consistency with design standards and other regulations governing scenic quality and consistency with the surrounding visual la ndscape. The proposed Project would not conflict with zoning and other regulations governing scenic quality and impacts would be less than significant.

7.1.4 SOURCES OF LIGHT OR GLARE
Impact Finding: The Project would not create a new source of substantial light or glare that would adversely affect day and nighttime views in the area (Draft EIR Page 5.1-10).

Facts in Support of Finding:

Construction
Limited, if any, nighttime lighting would be needed for Project construction during winter months. Section

16.20.125 of the City’s Development Code limits construction to between the hours of 7:00 a.m. to 7:00 p.m.

Monday through Saturday and does not allow construction on Sundays or federal holidays. Thus, most construction activity would occur during daytime hours during the week, and construction-related illumination would be used for limited safety and security purposes and would be required to be directed downward.

Page 167 ends

KISS Logistics Center Project

City of Hesperia 40
Findings of Fact
December 2023
In addition, construction of the Project would not include any materials that would generate offsite glare that could direct light to sensitive receptors. Therefore, impacts related to lighting and glare during construction would be less than significant.

Operation
Lighting: As discussed in the MSFC-SP, the buildout of the planning area would introduce new lighting sources to the mostly undeveloped landscape. Development of the MSFC -SP would result in significant and unavoidable impacts related to light and glare.

The Project site is currently undeveloped and does not contain sources of light or glare. N ighttime lighting sources include vehicles from Phelan Road and U.S. Route 395.

Section 16.16.350 of the City’s Municipal Code, states that industrial activity shall not cause light trespass exceeding 0.5 foot-candles (Fc) at the property lines neighboring a residential street or property. The Project site is bordered by vacant, undeveloped land on all sides and further, parcels in proximity are designated as CIBP and Regional Commercial (RC) within the MSFC -SP. Therefore, the Project would not result in t he trespass of lighting onto a residential street or property and would be in compliance with the City code.

Further, the City defers to Table 5.106.8 Maximum Allowable Backlight, Uplight and Glare (BUG) Ratings codified in the CA Energy Code and Chapter 10 of the CA Administrative Code. As shown in Figure 5.1 -1 Lighting Plan, the Project would fall within Lighting Zone 3 (LZ3) and would comply with the maximum allowable limits of LZ3 listed in Table 5.106.8. Therefore, Project development would not result in substantial light that would adversely affect views of the area, and impacts related to lighting would be less than significant.

Glare from reflective surfaces occurs as a result of the addition of large expanses of glass, metal, and other reflective surfaces for building façades with new construction. The Project would develop a new building that would generally be constructed of concrete with blue glass windows, painted concrete, and painted metal doors. The glass windows would not dominate building e levations and are intended to bring daylight into the building as well as provide design treatments to the exterior building walls. The windows would be individually framed openings and would be extended or recessed to create more depth and shadow.

Overall, the proposed Project would create limited new sources of light or glare from security and site lighting but would not adversely affect day or nighttime views in the area given the similarity of the existing lighting in the surrounding urbanizing environm ent. Thus, the Project would not create a new source of substantial light or glare which would adversely affect day or nighttime views in the area, and impacts would be less than significant.

7.1.5 CUMULATIVE AESTHETICS IMPACTS
Impact Finding: The Project would not result in cumulative impacts to aesthetics. (Draft EIR Page 5.1-15) Facts In Supporting Finding: The cumulative aesthetics study area for the Project is the viewshed from public areas that can view the Project site and locations that can be viewed from the Project site. Development of the Project site with industrial uses would contribute to a change in visual characteristics of the Project site and Project vicinity. As discussed previously, implementation of the land uses approved by the MSFC -SP would substantially change the existing visual character of the Project site. However, the Project would be compliant with the City’s Development Standards and MSFC -SP Development Standards, which would minimize aesthetic impacts related to the planned land use.

The cumulative change in visual condition that would result from Project development and operation, in combination with future nearby projects would not be considered adverse, because the Project would implement the MSFC-SP related to architecture, landscaping, signs, lighting, and other related items intended

Page 168 ends

KISS Logistics Center Project

City of Hesperia 41
Findings of Fact
December 2023
to improve visual quality. The Project would also be consistent with MSFC-SP design guidelines, which would be ensured by the City through review and approval of the Project’s Development Plans. Pro ject development and operation would result in a less than significant cumulatively considerable impact related to degradation of the existing visual character or quality of the Project site and its surroundings.

The cumulative study area for light and gl are includes areas immediately adjacent to the Project site that could receive light or glare from the Project or generate daytime glare or nighttime lighting that would be visible within the Project site and could combine with lighting from the Project. Project lighting would comply with existing requirements to focus lighting sources on the Project site and shield lighting from spillage onto adjacent land uses. This would minimize nighttime light pollution and reduce the potential for glare onto adjacent roadways and land uses. Other projects located throughout the MSFC -SP would similarly be required to comply with these regulations as well. Cumulative projects would result in more intense development than currently exists within the MSFC -SP area. However, through implementation of existing standards and applicable lighting measures, the Project, in combination with past, present, and reasonably foreseeable future projects would result in less than significant cumulative nighttime lighting and daytime glare impacts.

7.2 AGRICULTURE AND FOREST RESOURCES

7.2.1 CONVERSION OF AGRICULTURAL LANDS AND FORESTLANDS
Impact Finding: The Project would not involve the conversion of any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to urban uses (Initial Study Page 30).

Facts in Support of Finding: The Project site is not designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance by the California Department of Conservation. The Project site is identified as “Grazing Land” by the California Department of Conservation’s California Important Farmland Finder (FMMP, 2022). The Project site is currently zoned as Commercial/Industrial Business Park (CIBP) and Neighborhood Commercial (NC) by the Main Street and Freeway Corridor Specific Plan. The implementation of the proposed Project would not involve the conversion of any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to urban uses. The Project also lacks any characteristics that would lead to farmland or forest land being converted into a nonagricultural or non -forest use. As a result, no impact would occur, and this topic was not further analyzed in the Draft EIR.

7.2.2 WILLIAMSON ACT CONTRACT
Impact Finding: The Project would not result in the cancellation of a W illiamson Act contract (Initial Study

Page 31 ends

Facts in Support of Finding: The Project site is currently zoned as Commercial Industrial Business Park (CIBP) and Neighborhood Commercial (NC). The property is vacant and undeveloped. There are no existing agricultural uses located within the site or adjacent to the site that would be affected by the Project’s implementation. According to Exhibit 3.2 -2, Williamson Act Map, of the Hesperia General Plan Update Environmental Impact Report, the Project site is no t subject to a Williamson Act Contract. Therefore, development of the Project would not result in the cancellation of a Williamson Act contract. As a result, no impact would occur, and this topic was not be evaluated in the EIR.

7.2.3 TIMBERLAND PRODUCTION
Impact Finding: The Project would not conflict with forest land or timberland, or timberland zoned timberland production (Initial Study Page 31).

Page 169 ends

KISS Logistics Center Project

City of Hesperia 42
Findings of Fact
December 2023
Facts in Support of Finding: The Project site is designated Commercial/Industrial Business Park (CIBP) and Neighborhood Commercial (NC), and is not zoned for forest land, timberland, or TPZ. Therefore, the Project would not result in impacts to forests or timberlands, and this topic was not further analyzed in the Draft EIR.

7.2.4 FORESTLAND
Impact Finding: The Project would not result in the loss or conversion of forest land (Initial Study Page 31).

Facts in Support of Finding: The Project site is designated Commercial/Industrial Business Park (CIBP) and Neighborhood Commercial (NC). The Project site does not contain any for est land. Consequently, the proposed Project would not result in the loss or conversion of forest land to non-forest use, and this topic was not further analyzed in the Draft EIR.

7.2.5 CUMULATIVE AGRICULTURE
The proposed Project would result in no impact related to agricultural resources. The proposed Project is not located within an area zoned for agriculture or forest land, is not within a property under a Williamson Act, and is not located on state -important farmland. Thus, the development of the proposed Pro ject and cumulative projects would not result in a significant impact to agricultural resources. Therefore, impacts to agricultural resources would not be cumulatively considerable.

7.3 AIR QUALITY

7.3.1 CONFLICT WITH AN APPLICABLE AIR QUALITY PLAN
Impact Finding: The Project would not conflict with or obstruct implementation of an applicable air quality plan (Draft EIR Page 5.2-15).

Facts in Support of Finding: The Federal Particulate Matter Attainment Plan and Ozone Attainment Plan for the Mojave Desert set forth a comprehensive set of programs that will lead the Basin into compliance with federal and state air quality standards. The control measures and related emission reduction estimates within the Federal Particulate Matter Attainment Plan and Ozone Attainment P lan are based upon emissions projections for a future development scenario derived from land use, population, and employment characteristics defined in consultation with local governments.

A project is non -conforming with an air quality plan if it conflic ts with or delays implementation of any applicable attainment or maintenance plan. A project is conforming if it complies with all applicable MDAQMD rules and regulations, complies with all proposed control measures that are not yet adopted from the applicable plan(s), and is consistent with the growth forecasts in the applicable plan(s) (or is directly included in the applicable plan). Zoning changes, specific plans, general plan amendments and similar land use plan changes that do not increase dwelling unit density, do not increase vehicle trips, and do not increase VMT are also deemed to comply with the applicable air quality plan (MDAQMD 2020).

The Project site has a General Plan Land Use designation of Main Street and Freeway Corridor Specific Plan (MSFC SP) per the City’s 2010 General Plan. Within the MSFC SP, the two northerly parcels of the site (APNs 3064-401-03 and -04) are zoned as Commercial/Industrial Park (CIBP). The MSFC SP states that the purpose of the CIBP zone is to provide service for comm ercial, light industrial, light manufacturing, and industrial support uses, mainly conducted in enclosed buildings. Within the MSFC SP, the southerly parcel of the site (APN 3064-401-05) is designated as Neighborhood Commercial (NC). The MSFC SP states that the NC is intended for immediate day -to-day convenience shopping and services for the residents of nearby neighborhoods. NC does not permit industrial and warehousing uses; therefore, the proposed Project would require a Specific Plan amendment. The proposed CIBP land use would ultimately be anticipated to result in a lower trip and/or VMT than compared to the NC land use currently existing in the southern portion of the

Page 170 ends

KISS Logistics Center Project

City of Hesperia 43
Findings of Fact
December 2023
Project site, because commercial uses typically generate a higher number of overall t rips and VMT than industrial uses, as demonstrated in Tables 5.2-5 and 5.2-6 (Draft EIR Page 5.2-17). Therefore, the proposed change to the Specific Plan designation is consistent with the surrounding properties and uses and the Project would not increase dwelling unit density or vehicle trips. Therefore, because the Project does not exceed any of the thresholds it would not conflict with MDAQMD’s goal of bringing the Basin into attainment for all criteria pollutants and, as such, is consistent with the AQMP. As a result, impacts related to conflict with the AQMP from the proposed Project would be less than significant.

7.3.2 CUMULATIVELY CONSIDERABLE NET INCREASE OF CRITERIA

POLLUTANTS
Impact Finding: The Project would not result in a cumulatively considerable net increase of a criteria pollutant for which the project region is non -attainment under and applicable federal or state ambient air quality standard (Draft EIR Page 5.2-16).

Facts in Support of Finding:

Construction
Construction activities associated with the proposed Project would result in emissions of CO, VOCs, NOx, SOx, PM10, and PM2.5. Pollutant emissions associated with construction would be generated from the following construction activities: (1) grading and excavation; (2) construction workers traveling to and from the Project site; (3) delivery and hauling of construction supplies to, and debris from, the Project site; (4) fuel combustion by onsite construction equipment; (5) building construction; application of architectural coatings; and paving. These construction activities would temporarily create emissions of dust, fumes, equipment exhaust, and other air contaminants.

Construction emissions , including the offsite improvements, are short -term and temporary, and emissions resulting from construction would not exceed criteria pollutant thresholds as shown in Table 5.2-5 (Draft EIR,

Page 5 ends

Operation
Implementation of the proposed Proje ct would result in long -term emissions of criteria air pollutants from area sources generated by the proposed high -cube warehouse building and related vehicular emissions, landscaping, and use of consumer products. As shown in Table 5.2 -6, the Project’s op erational activities would not exceed the numerical thresholds of significance established by the MDAQMD (Draft EIR, Page

5.2-17). Therefore, impacts would be less than significant.

7.3.3 EXPOSE SENSITIVE RECEPTORS TO SUBSTANTIAL POLLUTANT

CONCENTRATIONS
Impact Finding: The Project would not expose sensitive receptors to substantial pollutant concentrations (Draft EIR Page 5.2-18).

Facts in Support of Finding:

Construction Mobile Source Health Risk. A Construction Health Risk Assessment, included as part of Appendix B, was prepared to evaluate the health risk impacts as a result of exposure to DPM as a result of heavy-duty diesel trucks and equipment activities from Project construction. The closest sensitive receptor to the Project site include residential uses located approximately 1,100 feet southwest of the Project site along Phelan Road. As shown in Draft EIR Table 5.2-7, the maximum cancer risk for the sensitive receptor maximally effected individual (MEI) would be 4.60 7.36 in one million, which would not exceed the MDAQMD cancer

Page 171 ends

KISS Logistics Center Project

City of Hesperia 44
Findings of Fact
December 2023
risk threshold of 10 in one million. The worker receptor risk would be lower at 0.08 0.18 in one million, which would also not exceed the threshold. The total chronic hazard index would be 0.005 0.010 for both the worker receptor MEI and 0.008 for the sensitive receptor MEI, which is would both be below the threshold of 1.0. In addition, the total acute hazard index would be nominal (0.000), which would also not exceed the threshold of 1.0. As such, the Project would not cause a sig nificant human health or cancer risk to adjacent land uses as a result of Project construction activity, and impacts would be less than significant.

Operational Diesel Mobile Source Health Risk. A Health Risk Analysis, included as part of Appendix B, was prepared to evaluate the operational health risk impacts as a result of exposure to DPM as a result of heavy-duty diesel trucks traveling to and from the Project site, maneuvering onsite, and entering and leaving the site during operation of the proposed in dustrial uses. All health risk levels to nearby residents from operation-related emissions of TACs would be well below the MDAQMD’s HRA thresholds. Therefore, impacts related to operational TAC emissions would be less than significant.

Friant Ranch Case. In December 2018, in the case of Sierra Club v. County of Fresno (2018) 6 Cal. 5th 502, the California Supreme Court held that an EIR's air quality analysis must meaningfully connect the identified air quality impacts to the human health consequences of those impacts, or meaningfully explain why that analysis cannot be provided. As noted in the Brief of Amicus Curiae filed by the SCAQMD in the Friant Ranch case (April 6, 2015, Appendix 10.1), SCAQMD has among the most sophisticated air quality modeling and health impact evaluation capability of any of the air districts in the State, and thus it is uniquely situated to express an opinion on how lead agencies should correlate air quality impacts with specific health outcomes.

The SCAQMD discusses that it may be infeasible to quantify health risks caused by projects similar to the proposed Project, due to many factors. It is necessary to have data regarding the sources and types of air toxic contaminants, location of emission points, velocity of emissions, the meteorology and topography of the area, and the location of receptors (worker a nd residence). The Brief states that it may not be feasible to perform a health risk assessment for airborne toxics that will be emitted by a generic industrial building that was built on "speculation" (i.e., without knowing the future tenant(s). Even where a health risk assessment can be prepared, however, the resulting maximum health risk value is only a calculation of risk --it does not necessarily mean anyone will contract cancer as a result of the Project. The Brief also cites the author of the CARB methodology, which reported that a PM2.5 methodology is not suited for small projects and may yield unreliable results. Similarly, SCAQMD staff does not currently know of a way to accurately quantify O3 - related health impacts caused by NOX or VOC emissions f rom relatively small projects, due to photochemistry and regional model limitations. The Brief concludes, with respect to the Friant Ranch EIR, that although it may have been technically possible to plug the data into a methodology, the results would not have been reliable or meaningful.

On the other hand, for extremely large regional projects (unlike the proposed Project), SCAQMD states that it has been able to correlate potential health outcomes for very large emissions sources – as part of their rulemaking activity, specifically 6,620 lbs./day of NOX and 89,180 lbs./day of VOC were expected to result in approximately 20 premature deaths per year and 89,947 school absences due to O3. The proposed Project would generate up to 51.3 lbs/day of NOX during construction and 11.2 lbs/day of NOX during operations. The VOC emissions would be a maximum of 63.9 lbs/day during construction and 13.6 lbs/day during operations.

Therefore, the emissions are not sufficiently high enough to use a regional modeling program to correlate health effects on a basin-wide level. Notwithstanding, a Mobile Source Health Risk Assessment was prepared, as detailed below, and the proposed Project would not result in emissions that exceeded the MDAQMD’s health risk thresholds. Therefore, the proposed Project would not be expected to exceed the most stringent applicable federal or state ambient air quality standards for emissions.

Page 172 ends

KISS Logistics Center Project

City of Hesperia 45
Findings of Fact
December 2023
Long-Term Microscale (CO Hot Spot) Analysis. Vehicular trips associated with the proposed Project would contribute to congestion at intersections and along roadway segments in the project vicinity. Localized air quality impacts would occur when emissions from vehicular traffic increase as a result of the proposed Project.

The primary mobile-source pollutant of local concern is CO, a direct function of vehicle idling time and, thus, of traffic flow conditions. CO transport is extremely limited; under normal meteorological conditions, CO disperses rapidly with distance from the source. However, under certain extreme meteorological conditions, CO concentrations near a congested roadway or intersection may reach unhealthful levels, affecting local sensitive receptors (e.g., residents, schoolchildren, the elderly, and hospital patients). Typically, high CO concentrations are associated with roadways or intersections operating at unacceptable levels of service or with extremely high traffic volumes. In areas with high ambient background CO concentrations, modeling is recommended to determine a project’s effect on local CO levels.

An assessment of Project-related impacts on localized ambient air quality requires that future ambient air quality levels be projected. Existing CO concentrations in the immediate Project vicinity are not available.

Ambient CO levels monitored at the Victorville station, the closest station to the Project site, showed a highest recorded 1-hour concentration of 1.6 ppm (the State standard is 20 ppm) and a highest 8-hour concentration of 1.4 ppm (the State standard is 9 ppm) during the past 3 years. The highest CO concentrations would normally occur during peak traffic hours; hence, CO impacts calculated under peak traffic conditions represent a worst-case analysis.

As described in the Project’s Traffic Impact Analysis, the proposed Project would generat e 131 AM peak hour trips and 149 PM peak-hour trips. Conversely, the busiest intersection evaluated in the 2003 analysis was at Wilshire Boulevard and Veteran Avenue, which had a daily traffic volume of approximately 100,000 trips and AM/PM traffic volumes of 8,062 trips and 7,719 trips, respectively. As shown in Table 5.2-9, the 2003 AQMP estimated that the 1 -hour concentration for this intersection was 4.6 ppm. Therefore, this indicates that, should the daily traffic volume increase four times to 400,000 vehicles per day, CO concentrations (4.6 ppm x 4= 18.4 ppm) would still not likely exceed the most stringent 1-hour CO standard (20.0 ppm). Therefore, given the extremely low level of CO concentrations in the Project area, and significantly lower volumes o f Project related trips at any intersections, Project -related vehicles are not expected to contribute significantly to result in the CO concentrations exceeding the State or federal CO standards. As such, impacts related to CO would be less than significant.

7.3.4 OTHER EMISSIONS
Impact Finding: The Project would not result in other emissions (such as those leading to odors) adversely affecting a substantial number of people (Draft EIR, Page 5.2-21).

Facts in Support of Finding: The proposed Project would not emit other emissions, such as those generating objectionable odors, that would affect a substantial number of people. Odors generated by the operation of the proposed Project are not expected to be significant or highly objectionable and would be required to be in compliance with MDAQMD Rule 402, which would prevent nuisances to sensitive land uses.

During construction, emissions from construction equipment, architectural coatings, and paving activities may generate odors. However, these odors would be tempora ry, intermittent in nature, and not expected to affect a substantial number of people. Additionally, noxious odors would be confined to the immediate vicinity of the construction equipment. By the time such emissions reach any residences, they would be diluted to well below any level of odor concern. Furthermore, short term construction-related odors are expected to cease upon the drying or hardening of the odor producing materials.

During operations, trucks and vehicles operating at the loading docks may emit odor. A southern California study (Zhu, 2002) showed measured concentrations of vehicle -related pollutants, including diesel exhaust, decreased dramatically (more than 90%) within approximately 300 feet. There are no sensitive receptors

Page 173 ends

KISS Logistics Center Project

City of Hesperia 46
Findings of Fact
December 2023
adjacent to the Project site or within 300 feet of proposed loading dock facilities. Therefore, by the time any diesel exhaust emissions reach the nearest receptor, they would be diluted and not generate an objectionable odor. In addition, all Project -generated solid was te would be stored in covered containers and removed at regular intervals in compliance with solid waste regulations and would not generate objectionable odors. Therefore, impacts associated with operation- and construction-generated odors would be less than significant, and this topic was not further analyzed in the Draft EIR.

7.3.5 CUMULATIVE AIR QUALITY IMPACTS
Impact Finding: The Project would not result in cumulative air quality impacts (Draft EIR Page 5.2-22).

Facts In Supporting Finding: The geographic area for analysis of cumulative air quality impacts is the Basin.

The proposed Project is consistent with the assumptions in the City’s General Plan and would not conflict with MDAQMD’s attainment plans. Other cumulative projects would also be required to demonstrate consistency with the MDAQMD attainment plans as part of the CEQA review process and/or provide mitigation, as appropriate.

As described previously, per MDAQMD’s methodology, if an individual project would result in air emissions of criteria pollutants that exceed the MDAQMD’s thresholds for project -specific impacts, then it would also result in a cumulatively considerable net increase of these criteria pollutants. Emissions from operation of the proposed Project would not exceed MDAQMD’s thresholds for any criteria pollutants or TACs and would not expose sensitive receptors to substantial pollutant concentrations. Because emissions from implementation of the proposed Project would not exceed applicable thresholds, they would not be cumulatively considerable, and cumulative air quality impacts would be less than significant.

7.4 BIOLOGICAL RESOURCES

7.4.1 WETLANDS
Impact Finding: The Project would not have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means (Draft EIR Page 5.3-22).

Facts in Support of Findings: According to the General Biological Assessment and subsequent study, the Project site does not contain any jurisdictional areas that would be subject to Section 404 of the Clean Water Act. The Oro Grande Wash is locat ed approximately 0.25 mile southeast of the Project site, and the proposed sewer line includes jack and bore pits that would be used to align the sewer would run beneath Oro Grande Wash. However, the Project site would not directly impact the Oro Grande Wa sh. Therefore, Project development and operation would not have any impacts to State or Federally protected wetlands, including vernal pools or marsh areas. Thus, impacts to state or federally protected wetlands would not occur from implementation of the proposed Project.

7.4.2 CONSERVATION PLANS
Impact Finding: The Project would not conflict with the provisions of an adopted habitat conversation plan, natural community conservation plan, or other approved local, regional, or state habitat conservation plan (Draft EIR Page 5.3-24).

Facts in Support of Findings: The Project is located within the California Desert Conservation Area Plan (BLM 1980) planning area, which includes plan amendments: Draft West Mojave Plan (BLM 2005) and the Desert Renewable Energy Conservation Plan (BLM 2016). The Project would not conflict with the conservation criteria associated with the California Desert Conservation Area Plan or Desert Renewable Energy Conservation Plan. The California Desert Conservation Area Plan is applicable to the management of public

Page 174 ends

KISS Logistics Center Project

City of Hesperia 47
Findings of Fact
December 2023
lands. The Project site is privately owned, and therefore, the Project would result in no impact. As such, the Project would not conflict with Habitat Conservation Plans, Natural Community Conservation Plans, or other approved local, regional, or state habitat conservation plan, and impacts would be less than significant.

7.5 CULTURAL RESOURCES

7.5.1 HISTORICAL RESOURCES
Impact Finding: The Project would not cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5 (Draft EIR Page 5.4-6).

Facts in Support of Findings:

A Project-specific cultural resources assessment was conducted for the Project site and included a records search and pedestrian survey (Appendix D). The records search also revealed 53 previously recorded resources (two prehistoric and 51 historic) within one mile of the Project site. None of the 53 resources were identified as being within the Project site. During the field visit, no evidence of any historic or prehistoric cultural resources within the Project site was identified. Therefore, since no historical resources have been identified on the Project site, the Project would not cause an adverse change in the significance of a historic resource pursuant to §15064.5.

7.5.2 DISTURBANCE OF HUMAN REMAINS
Impact Finding: The Project would not disturb any human remains, including those interred outside of formal cemeteries. (Draft EIR Page 5.4-7).

Facts in Support of Findings: The Project site is not known to include any burial grounds, graveyards, or dedicated cemeteries. However, it is possible that human remains are buried outside of formal cemeteries.

Therefore, should human remains be unearthed during grading and excavation activities, the Project would be required to comply with Cal ifornia Health and Safety Code Section 7050.5, Public Resources Code Section 5097.98, and CEQA Guidelines Section 15064.5, which provide guidance on the discovery of human remains and their treatment or disposition with appropriate dignity. Through mandato ry compliance with these required regulations, impacts would be less than significant.

REGULATORY REQUIREMENTS
PPP CUL-1. Should human remains or funerary objects be discovered during Project construction, the Project would be required to comply with Stat e Health and Safety Code Section 7050.5, which states that no further disturbance may occur in the vicinity of the body (within a 100- foot buffer of the find) until the County Coroner has made a determination of origin and disposition pursuant to Public Re sources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner will notify the Native American Heritage Commission, which will determine the identity of and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD must complete the inspection within 48 hours of notification by the NAHC.

Page 175 ends

KISS Logistics Center Project

City of Hesperia 48
Findings of Fact
December 2023

7.6 ENERGY

7.6.1 WASTEFUL, INEFFICIENT, OR UNNECESSARY CONSUMPTION OF ENERGY
Impact Finding: The Project would not result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during Project construction or operation (Draft EIR Page 5.5-5).

Facts in Support of Finding:

Construction
Construction activities related to the proposed Project and the associated infrastructure are not expected to result in demand for fuel greater on a per -unit-of-development basis than other development projects in Southern California. Demolition of existing structures on the site is limited and much of the demolition materials would be recycled. Also, CCR Title 13, Motor Vehicles, section 2449(d)(3) Idling, limits idling times of construction vehicles to no more than 5 minutes, thereby precluding unnecessary and wasteful consumption of fuel due to unproductive idling of construction equipment. The energy analysis modeling for the proposed Project (included as Appendix B) details that construc tion-related use of off -road equipment would utilize 135,870.5 gallons of diesel fuel and 116,177.2 gallons of gasoline. Construction contractors are required to demonstrate compliance with applicable California Air Resources Board (CARB) regulations governing the accelerated retrofitting, repowering, or replacement of heavy -duty diesel on- and off-road equipment. In addition, compliance with existing CARB idling restrictions and the use of newer engines and equipment would reduce fuel combustion and energy consumption. Overall, construction activities would require limited energy consumption, would comply with all existing regulations, and would therefore not be expected to use large amounts of energy or fuel in a wasteful manner. Thus, impacts related to c onstruction energy usage would be less than significant.

Operation
Once operational, the Project building would generate demand for electricity, natural gas, as well as gasoline for motor vehicle trips. Operational use of energy includes the heating, cooling, and lighting of buildings, water heating, operation of electrical systems and plug-in appliances within buildings, parking lot and outdoor lighting, and the transport of electricity, natural gas, and water to the areas where they would be consumed. This use of energy is typical for urban development, and no operational activities or land uses would occur that would result in extraordinary energy consumption. The Project includes several Project Design Features (PDFs) that would reduce Project emissions and energy demand. Project PDF-1 through PDF- 6 include energy reduction measures such as implementation of renewable energy system, inclusion of automatic light switches and control receptacles, the Project would be designed to meet LEED certification standards, low volatile organic compound (VOC) coatings and paint would be used, and exterior glazing to reduce solar heat gain would be applied.

Operation of the Project is estimated to annually use 676,198.1gallons of diesel fuel and 371,755.7 gallons of gasoline. CCR Title 13, Motor Vehicles, section 2449(d)(3) Idling, limits idling times of construction vehicles to no more than 5 minutes. The idling restrictions would preclude unnecessary and wasteful consumption of fuel due to unproductive idling of trucks.

In addition. operation of the Project would use approximately 4,417,821 (kWh) per year of electricity.

Because this use of energy is typical for urban development, no operational activities or land uses would occur that would result in extraordinary e nergy consumption. Through City permitting, assurance would be provided that existing regulations related to energy efficiency and consumption, such as Title 24 regulations

Page 176 ends

KISS Logistics Center Project

City of Hesperia 49
Findings of Fact
December 2023
and CCR Title 13, Motor Vehicles, section 2449(d)(3) related to idling, would be im plemented. Therefore, impacts related to operational energy consumption would be less than significant.

7.6.2 CONFLICT WITH PLAN FOR RENEWABLE ENERGY OR ENERGY

EFFICIENCY
Impact Finding: The Project would not conflict with or obstruct a state or local plan for r enewable energy or energy efficiency (Draft EIR Page 5.5-6).

Facts in Support of Finding: The proposed Project would be required to meet the CCR Title 24 energy efficiency standards in effect during permitting of the proposed Project. The City’s administration of the CCR Title 24 requirements includes review of design components and energy conservation measures that occurs during the permitting process, which ensures that all requirements are met. In addition, the Project would not conflict with the idling limits imposed by CCR Title 13, Motor Vehicles, section 2449(d)(3) Idling. Furthermore, the Project would not conflict with or obstruct opportunities to use renewable energy, such as solar energy.

In addition, the Project would provide solar panels in order to offset the Project’s energy demands. Thus, the Project would not obstruct use of renewable energy or energy efficiency.

The CEC’s 2021 Integrated Energy Policy Report and 2022 Integrated Energy Policy Report Update provides the results of the CEC’s a ssessments of a variety of energy issues facing California. Energy usage on the Project site during construction would be temporary in nature and would be relatively small in comparison to the overall use in the County. In addition, energy usage associated with operation of the proposed Project would be relatively small in comparison to the overall use in San Bernardino County, and the State’s available energy resources. Therefore, energy impacts at the regional level would be negligible. Because California’s energy conservation planning actions are conducted at a regional level, and because the proposed Project’s total impact on regional energy supplies would be minor, the proposed Project would not conflict with or obstruct California’s energy conservation plans as described in the CEC’s Integrated Energy Policy Report.

Overall, the Project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency. Impacts would be less than significant.

7.6.3 CUMULATIVE ENERGY IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to energy. (Draft EIR Page 5.5- 7).

Facts in Support of Finding: The geographic context for analysis of cumulative impacts regarding energy includes past, present, and future development within southern California because energy supplies (including electricity, natural gas, and petroleum) are generated and distributed throughout the southern California region.

All development projects throughout the region would be required to comply wi th the energy efficiency standards in the Title 24 requirements. Additionally, some of the developments could provide for additional reductions in energy consumption by use of solar panels, sky lights, or other LEED -type energy efficiency infrastructure. With implementation of the existing energy conservation regulations, cumulative electricity and natural gas consumption would not be cumulatively wasteful, inefficient, or unnecessary.

Petroleum consumption associated with the proposed uses and cumulative d evelopment projects would be primarily attributable to transportation, especially vehicular use. However, state fuel efficiency standards and alternative fuels policies (per AB 1007 Pavely (2005)) would contribute to a reduction in fuel use, and the federal Energy Independence and Security Act and the state Long Term Energy Efficiency Strategic Plan would reduce reliance on non-renewable energy resources. For these reasons, the consumption of petroleum

Page 177 ends

KISS Logistics Center Project

City of Hesperia 50
Findings of Fact
December 2023
would not occur in a wasteful, inefficient, or unnecessary manner and impacts would be less than cumulatively considerable.

7.7 GEOLOGY AND SOILS

7.7.1 EXPOSE PEOPLE OR STRUCTURES TO FAULT RUPTURE
Impact Finding: The Project would not directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the state geologist for the area of based on other substantial evidence of a known fault (Draft EIR Page 5.6-11).

Facts in Support of Finding: The Project site is not located within an Alquist -Priolo Earthquake Fault zone (California Geological Survey 2021). The closest Alquist -Priolo Earthquake Fault zone is the San Andreas Fault Zone, located approximately 10.9 miles southwest of the Project site. Due to the distance of the Project site from the closest fault zone, there is no potential for the Project to be subject to rupture of a known earthquake fault. Impacts related to a fault zone would not occur from implementation of the proposed Project.

7.7.2 EXPOSE PEOPLE OR STRUCTURES TO STRONG SEISMIC GROUND

SHAKING
Impact Finding: The Project would not directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving strong seismic ground shaking (Draft EIR Page 5.6-11).

Facts in Support of Finding: The Project site, like most of southern California, could be subject to seismically related strong ground shaking. The closest active fault zone to the Project site is the San Andreas fault zone, located approximately 10.9 miles from the Project site. A major earthquake along this fault or another regional fault could cause substantial seismic ground shaking at the site. However, structures built in the City are required to be built in compliance with the CBC (California Code of Regulations, Title 24, Part 2) that provides provisions for earthquake safety based on factors including building occupancy type, the types of soils onsite, and the probabl e strength of ground motion. Compliance with the CBC would require the incorporation of: 1) seismic safety features to minimize the potential for significant effects as a result of earthquakes; 2) proper building footings and foundations; and 3) constructi on of the building structure so that it would withstand the effects of strong ground shaking.

Pursuant to Title 15, Buildings and Construction, of the Hesperia Municipal Code, the Project would incorporate the design recommendations included in its geotechnical report, which will be subject to review and approval by City staff prior to issuance of a grading permit. Compliance with the CBC as verified by the City’s review process and included as a condition of approval, would reduce impacts related to stron g seismic ground shaking to a less than significant level.

REGULATORY REQUIREMENTS
PPP GEO-1: CBC Compliance. The Project is required to comply with the California Building Standards Code as included in Chapter 15.04 of the Hesperia Municipal Code to preclude significant adverse effects associated with seismic and soils hazards. CBC related and geologist and/or civil engineer specifications for the proposed Project are required to be incorporated into grading plans and building specifications as a conditio n of construction permit approval.

Page 178 ends

KISS Logistics Center Project

City of Hesperia 51
Findings of Fact
December 2023

7.7.3 EXPOSE PEOPLE OR STRUCTURES TO LANDSLIDES
Impact Finding: The Project would not directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving landslides (Draft EIR Page 5.6-12).

Facts in Support of Finding: According to the Geotechnical Investigation, the Project site is located in a flat area that does not contain nor is adjacent to large slopes, and the Project would not generate large slopes.

As a result, implementation of the Project would not expose people or structures to substantial adverse effects involving landslides, and impacts related to landslides would not occur.

7.7.4 SOIL EROSION OR LOSS OF TOPSOIL
Impact Finding: The Project would not result in substantial soil erosion or the loss of topsoil (Draft EIR Page

5.6-12).

Facts in Support of Finding:

Construction
Construction of the proposed Project has the potential to contribute to soil erosion and the loss of topsoil.

Grading activities that would be required for the Project would expose and loosen topsoil, which could be eroded by wind or water. Hesperia Municipal Code Chapter 15.06.110, National Pollutant Discharge Elimination System Compliance , implements the requirements of the California Region al Water Quality Control Board (RWQCB) National Pollutant Discharge Elimination System (NPDES) Storm Water Permit Order No. R8-2002-0011 (MS4 Permit) which establishes minimum stormwater management requirements and controls that are required to be implemented for the Project.

To reduce the potential for soil erosion and the loss of topsoil, a Stormwater Pollution Prevention Plan (SWPPP) is required by these City and RWQCB regulations to be developed by a QSD (Qualified SWPPP Developer), which would be impl emented by the City’s conditions of approval. The SWPPP is required to address site-specific conditions related to specific grading and construction activities that could cause erosion and the loss of topsoil and provide erosion control BMPs to reduce or eliminate the erosion and loss of topsoil.

Erosion control BMPs include use of silt fencing, fiber rolls, or gravel bags, stabilized construction entrance/exit, hydroseeding, etc. With compliance with the Municipal Code Chapter 15.06.110 stormwater management requirements, RWQCB SWPPP requirements, and installation of BMPs, which would be implemented by the City’s Project review by the Building and Safety Division, construction impacts related to erosion and loss of topsoil would be less than significant.

Operation
The proposed Project includes installation of landscaping adjacent to the proposed building and throughout the proposed parking areas. With this landscaping, areas of loose topsoil that could erode by wind or water would not exist upon operation of the proposed Project. In addition, as described in Draft EIR Section 5.9, Hydrology and Water Quality, the hydrologic features of the proposed Project have been designed to slow, filter, and retain stormwater within landscaping and the proposed undergroun d infiltration basins, which would also reduce the potential for stormwater to erode topsoil. Furthermore, implementation of the Project requires City approval of a Water Quality Management Plan (WQMP) (Appendix K), which would ensure that RWQCB requiremen ts and appropriate operational BMPs would be implemented to minimize or eliminate the potential for soil erosion or loss of topsoil to occur. As a result, with implementation of existing requirements, impacts related to substantial soil erosion or loss of topsoil would be less than significant.

Page 179 ends

KISS Logistics Center Project

City of Hesperia 52
Findings of Fact
December 2023

7.7.5 EXPANSIVE SOIL
Impact Finding: The Project would not be located on expansive soils, as defined in Table 18 -1-B pf the Uniform Building Code (1994 ), and would not create substantial risks to life or property (Draft EI R Page

5.6-14).

Facts in Support of Finding: Table 18-1-B of the Uniform Building Code mandates that special foundation design consideration be employed if the Expansion Index of soils is 20 or greater. The Geotechnical Investigation describes that the Project site’s near-surface soils consist of fine- to coarse-grained, silty sand with some roots that is in a loose condition. According to the Geotechnical Investigation, these materials have an Expansion Index of 0 and therefore are expected to have very lo w to low expansion potential (AGS 2022). Accordingly, the Project site does not contain expansive soils and as such, would not create substantial direct or indirect risks to life or property associated with the presence of expansive soils. No impact would occur.

7.7.6 SOILS INCAPABLE OF SUPPORTING SEPTIC TANKS
Impact Finding: The Project would not have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater (Draft EIR Page 5.6-14).

Facts in Support of Finding: The proposed Project would install new onsite and offsite sewer lines and would not include the use of septic tanks or alternative wastewater disposal systems. No impacts related to septic tanks or alternative wastewater disposal systems would occur from implementation of the Project.

7.7.7 CUMULATIVE GEOLOGICAL HAZARDS AND SOILS IMPACTS
Impact Finding: The Project would not result in cumulatively considerable impacts to geology and soils (Draft EIR Page 5.6-15).

Facts in Support of Finding: Geotechnical impacts are site-specific rather than cumulative in nature. Direct and indirect impacts related to geology and soils would be mitigated through mandatory conformance with the California Building Code, Ci ty of Hesperia Municipal Code, and site -specific geotechnical recommendations, which will be incorporated as part of the Project’s design and construction efforts. With the exception of erosion hazards, potential hazardous effects related to geologic and s oil conditions are unique to each project site, and inherently restricted to the developments proposed. That is, issues including fault rupture, seismic ground shaking, liquefaction, landslides, and expansive soils would involve effects to (and not from) t he development, are specific to conditions on the property, and are not influenced by or additive with the geologic and/or soils hazards that may occur on other, off-site properties. Because of the site-specific nature of these potential hazards and the measures to address them, there would be no direct or indirect connection to similar potential issues or cumulative effects at the Project site.

Impacts related to erosion and loss of topsoil could be cumulatively considerable. However, mandates related to the NPDES permit, preparation of a WQMP, and SWPPP, as well as compliance with SCAQMD Rule 403 (Fugitive Dust) incorporate measures during construction activities to ensure that significant erosion impacts do not occur. Other development project s in the vicinity of the Project site would be required to comply with the same regulatory requirements as the Project to preclude substantial adverse water and wind erosion impacts. Because the Project and related projects within the cumulative study area would be subject to similar mandatory regulatory requirements to control erosion hazards during construction and long -term operation, cumulative impacts associated with wind and water erosion hazards would be less than significant.

Page 180 ends

KISS Logistics Center Project

City of Hesperia 53
Findings of Fact
December 2023

7.8 GREENHOUSE GAS EMISSIONS

7.8.1 CONFLICT WITH AN APPLICABLE GREENHOUSE GAS PLAN, POLICY, OR

REGULATION
Impact Finding: The Project would not conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases (Draft EIR Page 5.7-14).

Facts in Support of Finding: The Project would provide contemporary, energy-efficient/energy-conserving design features and operational procedures. The proposed Project would not interfere with the state’s implementation of AB 1279’s target of 85 perc ent below 1990 levels and carbon neutrality by 2045 because it does not interfere with implementation of the GHG reduction measures listed in CARB’s Updated Scoping Plan (2022), as demonstrated in Draft EIR Tables 5.7 -3. CARB’s 2022 Scoping Plan reflects t he 2045 target of a, 85 percent reduction below 1990 levels, set by Executive Order B -55-18, and codified by AB 1279. In addition, the Project would be consistent with the following state policies that were adopted for the purpose of reducing GHG emissions.

Further, the proposed Project is consistent with AB 32 and SB 32 through implementation of measures that address GHG emissions related to building energy, solid waste management, wastewater, and water conveyance. Thus, the Project would be consistent with the State’s requirements for GHG reductions.

As demonstrated in Draft EIR Table 5.7 -4, the proposed Project would be consistent with each reduction measure evaluated for the City of Hesperia, as identified in the San Bernardino County Regional Greenhouse Gas Reduction Plan. In addition, the City has included the efficient use of energy resources as a goal in the General Plan Conservation Element. Moreover, as shown in Draft EIR Table 5.7 -5, the Project would not conflict with the relevant General Plan goals and policies related to GHGs.

Overall, the proposed Project would not result in a conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of GHGs. The Project would be implemented in compliance with state energy standards provided in Title 24, in addition to provision of sustainable design features. The Project would not interfere with the state’s implementation of Executive Order B-30-15 and SB 32’s target of reducing statewide GHG emissions to 40 percent below 1990 levels by 2030; or Executive Order S-3-05’s target of reducing statewide GHG emissions to 80 percent below 1990 levels by 2050 because it would be consistent with the CARB 2017 Scoping Plan, which is intended to achieve the reduction targets required by the state. In addition, the proposed Project would be consistent with the relevant City General Plan goal and policies. Thus, the proposed Project would not result in a conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of GHGs, and impacts would be less than significant.

7.9 HAZARDS AND HAZARDOUS MATERIALS

7.9.1 ROUTINE TRANSPORT, USE, OR DISPOSAL OF HAZARDOUS MATERIALS Impact Finding: The Project would not create a significant hazard to the public or the environment through the routine transport, use or disposal of hazardous materials (Draft EIR Page 5.8-15).

Facts in Support of Finding: Development and long-term operation of the Project would require standard transport, use, and disposal of hazardous materials and wastes.

Construction
Construction contractors would be required to comply with federal, state, and local laws and regulations regarding the transport, use, and storage of hazardous materials. Applicable laws and regulations include

Page 181 ends

KISS Logistics Center Project

City of Hesperia 54
Findings of Fact
December 2023
CCR, Title 8 Section 1529 (pertaining to ACM) and Section 1532.1 (pertaining to LBP); CFR, Title 40, Part 61, Subpart M (pertaining to ACM); CCR, Title 23, Chapter 16 (pertaining to UST); CFR, Title–29 - Hazardous Waste Control Act; CFR, Title 49, Chapter I; and Hazardous Materials Transportation Act requirements as imposed by the USDOT, CalOSHA, CalEPA and DTSC. Additionally, construction activities would require a SWPPP, which is mandated by the NPDES General Construction Permit (included as PPP WQ-1 herein) and enforced by the Lahontan RWQCB. The SWPPP will include strict onsite handling rules and BMPs to minimize potential adverse effects to workers, the public, and the environment during construction.

Mandatory compliance with applicable laws and regulations related to the routine transport, use, and disposal of hazardous materials during construction activities at the Project site would limit potentially significant hazards to construction workers, the public, and the environm ent. Impacts would be less than significant.

Operation
The Project site would be developed with a new industrial building that would support high -cube warehousing, manufacturing, and office uses utilizing up to five percent cold storage. Operations would include the manufacturing and storage of make-up products which may contain the use of various types and quantities of hazardous materials, including lubricants, solvents, cleaning agents, wastes, paints and related wastes, petroleum, wastewater, and batter ies (lead acid, nickel cadmium, nickel, iron, carbonate). These hazardous materials would be used, stored, and disposed of in accordance with applicable regulations and standards (such as CFR, Title 49, Chapter I; CCR, Title 8; CFR, Title 40, Part 263) tha t are enforced by the USEPA, USDOT, CalEPA, CalOSHA, DTSC, and County of San Bernardino Environmental Health Services.

Under California Health and Safety Code Section 25531 et seq., CalEPA requires businesses operating with a regulated substance that exceeds a specified threshold quantity to register with a managing local agency, known as the Certified Unified Program Agency (CUPA). In Hesperia, the San Bernardino County Fire Department is the CUPA. If the operations of future tenants of the proposed wareho use facility exceed established thresholds, CUPA permits would be required. The County requires businesses subject to any of the CUPA permits to file a Business Emergency/Contingency Plan. Additionally, businesses would be required to provide workers with training on the safe use, handling, and storage of hazardous materials. Additionally, businesses would be required to maintain equipment and supplies for containing and cleaning up spills of hazardous materials that can be safely contained and cleaned by onsite workers and to immediately notify emergency response agencies in the event of a hazardous materials release that cannot be safely contained and cleaned up by onsite personnel.

Additionally, prior to the approval of the Grading Plan and issuance of Grading Permits a completed Water Quality Management Plan (WQMP) shall be submitted to and approved by the Public Works Department, included as PPP WQ-2. BMPs would be incorporated in the WQMP that would protect human health and the environment should any ac cidental spills or releases of hazardous materials occur during operation of the Project, including onsite collection and treatment of potentially polluted runoff, as well as nonstructural maintenance implemented to prevent potentially hazardous spills or leaks of stored materials. Compliance with existing laws and regulations governing hazard and hazardous materials results in less than significant impacts related to the routine transport, use, and disposal of the hazardous materials, and this topic was not further analyzed in the Draft EIR.

REGULATORY REQUIREMENTS
PPP WQ-1: NPDES/SWPPP. Prior to issuance of any grading permits, the applicant shall provide the City Building and Safety Department evidence of compliance with the NPDES (National Pollutant Discharge Elimination System) requirement to obtain a construction permit from the State Water Resource Control Board (SWRCB). The permit requirement applies to grading and construction sites of one acre or larger. The Project applicant/proponent shall comply

Page 182 ends

KISS Logistics Center Project

City of Hesperia 55
Findings of Fact
December 2023
by submitting a Notice of Intent (NOI) and by developing and implementing a Stormwater Pollution Prevention Plan (SWPPP) and a monitoring program and reporting plan for the construction site.

PPP WQ-2: WQMP. Prior to the approval of the Grading Plan and issuance of Grading Permits a completed Water Quality Management Plan (WQMP) shall be submitted to and approved by the Public Works Department. The WQMP shall be submitted using the Mojave River Watershed Technical Guidance Document for Water Quality Management Plans and shall identify all Post -Construction, Site Design, Source Control, and Treatment Control Best Management Practices (BMPs) that will be incorporated into the development project in order to minimize the adverse effects on receiving waters.

7.9.2 RELEASE OF HAZARDOUS MATERIALS AND THE POTENTIAL FOR UPSET

CONDITIONS
Impact Finding: The Project would not create a significant hazard to the public or the environment through reasonably foreseeable upset or accident conditions involving the release of h azardous materials into the environment (Draft EIR Page 5.8-16).

Facts in Support of Finding:

Construction
Construction of the proposed Project would involve the limited use and disposal of hazardous materials.

Equipment that would be used in construction of the Project has the potential to release gas, oils, greases, solvents, and spills of paint and other finishing substances. However, the amount of hazardous materials onsite would be limited, and construction activities would be required to adhere to all applicable regulations regarding hazardous materials storage and handling, as well as to implement construction BMPs (through implementation of a required SWPPP implemented by City conditions of approval, and included as PPP WQ-1) to prevent a hazardous materials release and to promptly contain and clean up any spills, which would minimize the potential for harmful exposures. With compliance to existing laws and regulations, which is mandated by the City through construction permitting, the Project’s construction-related impacts would be less than significant.

Operation
The future tenants within the Project site may use, store, and dispose of various types and quantities of hazardous materials that would be required to comply with regulations and standards (such as CFR, Title 49, Chapter I; CCR, Title 8; CFR, Title 40, Part 263; San Bernardino County regulations; and City of Hesperia regulations enforced by the USEPA, USDOT, CalEPA, CalOSHA, DTSC, and San Bernardino County Fire Department). The San Bernardi no County Fire Department, as CUPA would require that future tenants prepare Business Emergency/Contingency Plans, which provide information to emergency responders and the general public regarding hazardous materials, and coordinates reporting of releases and spill response among businesses and local, state, and federal government authorities. Moreover, the proposed development Project would include a WQMP, included as PPP WQ -2. BMPs would be incorporated in the WQMP that would protect human health and the environment should any accidental spills or releases of hazardous materials occur during operation of the Project, including onsite collection and treatment of potentially polluted runoff, as well as nonstructural maintenance implemented to prevent potent ially hazardous spills or leaks of stored materials. Therefore, operations within the Project site would not result in a significant hazard to the public or the environment through reasonably foreseeable upset and accident involving hazardous material. Imp acts related to hazardous materials from operation would be less than significant.

Page 183 ends

KISS Logistics Center Project

City of Hesperia 56
Findings of Fact
December 2023

REGULATORY REQUIREMENTS
PPP WQ-1: NPDES/SWPPP. As previously listed.

PPP WQ-2: WQMP. As previously listed.

7.9.3 HAZARDOUS MATERIALS WITHIN ONE-QUARTER MILE OF AN EXISTING

OR PROPOSED SCHOOL
Impact Finding: The Project would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within 0.25 mile of an existing or proposed school (Draft EIR Page 5.8-17).

Facts in Support of Finding: The nearest school to the Project site is Canyon Ridge High School, located 1.5- miles southwest. Therefore, there are no schools located within a 0.25 mile of the Project site. In addition, trucks traveling to and from the Project site would s tay on designated truck routes, which are not within a

0.25-mile proximity of any existing school in the City of Hesperia.

Additionally, the use of hazardous materials related to the proposed industrial warehouse uses would be limited and used and dispose d of in compliance with federal, state, and local regulations, which would reduce the potential of accidental release into the environment. Also, the emissions that would be generated from construction and operation of the proposed Project were evaluated in the air quality analysis presented in Section 5.2 of the Draft EIR, and the emissions generated from the proposed Project would not cause or contribute to an exceedance of the federal or state air quality standards. Thus, the proposed Project would not emit hazardous or handle acutely hazardous materials, substances, or waste within 0.25 mile of school, and no impacts would occur.

7.9.4 CORTESE LIST
Impact Finding: The Project would not be located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and would not create a significant hazard to the public or the environment (Draft EIR Page 5.8-17).

Facts in Support of Finding: The Phase I ESA (Appendix H) conducted database searches t o determine if the Project area or any nearby properties are identified as currently having hazardous materials. The record searches determined that the Project site is not included on a list of hazardous materials sites pursuant to Government Code Section 65962.5 (McAlister GeoScience, 2022). As such, no impacts related to hazardous materials sites would occur.

7.9.5 NEAR AN AIRPORT OR WITHIN AN AIRPORT LAND USE PLAN Impact Finding: The Project would not result in a safety hazard or excessive noise for people re siding or working in the Project area for a project area for a project located within an airport land use plan or, where such a plan has not been adopted, be within two miles of a public airport or public use airport (Draft EIR

Page 5 ends

Facts in Support of Finding: The Project site is located approximately six miles northwest of the Hesperia Airport. According to the Hesperia Airport Comprehensive Land Use Plan, the site is outside of the 60 -65 dBA CNEL noise contour and would not be subject to excessive noise levels due to operations at the Hesperia Airport. The site is also outside of the established airport safety zones. Thus, the Project would not result in a safety hazard or excessive noise for people residing or working in the area. As such, no impact would occur.

Page 184 ends

KISS Logistics Center Project

City of Hesperia 57
Findings of Fact
December 2023

7.9.6 IMPAIR OR INTERFERE WITH AN ADOPTED EMERGENCY RESPONSE PLAN

OR EMERGENCY EVACUATION PLAN
Impact Finding: The Project would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan (Draft EIR Page 5.8-18).

Facts in Support of Finding: The City of Hesperia has adopted an Emergency Operations Plan (EOP) intended to provide comprehensive procedures and guidance for the City to prepare and respond to large- scale emergencies and di sasters in the community. In addition, the City of Hesperia is part of the San Bernardino County Operational Area and therefore has created a plan that complements the San Bernardino County Operational Area Emergency Operations Plan. Emergency responses ar e coordinated through various offices within City and County government and aligned agencies. The City of Hesperia, San Bernardino County Fire, and Sheriff’s office provide emergency response.

Construction
The proposed construction activities, including equipment and supply staging and storage, would occur within the Project site and would not restrict access of emergency vehicles to the Project site or adjacent areas.

During construction of the Project, driveways, and connections to existing infrastructur e along Phelan Road and Caliente Road would remain open to ensure adequate emergency access to the Project area and vicinity.

Construction activities within the Project site that may temporarily restrict vehicular traffic would be required to implement ade quate measures to facilitate the safe passage of persons and vehicles during required temporary road restrictions. In accordance with Section 503 of the California Fire Code (Title 24, California Code of Regulations, Part 9), prior to any activity that wou ld encroach into a right -of-way, the area of encroachment must be safeguarded through the installation of safety devices to ensure that construction activities would not physically interfere with emergency access or evacuation. Compliance with Section 503 of the California Fire Code would be specified by the City’s Building and Safety Division during the construction permitting process. Therefore, the Project would not block any evacuation routes or conflict with an emergency response plan, and impacts related to interference with an adopted emergency response of evacuation plan during construction activities would be less than significant.

Operation
Project access would occur off Caliente Road and Phelan Road. As described in Draft EIR Section 5.12, Transportation, these driveways and roadways would provide adequate and safe circulation to, from, and through the Project site and would provide a variety of routes for emergency responders to access the site and surrounding areas. Additionally, the Project would comply with Municipal Code standards, which require design and construction specifications to allow adequate emergency access to the site and ensure that roadway improvements would meet public safety requirements. Furthermore, drivers are expected to comply with all state driving laws, roadway signage, as well as restrictions related to vehicle stopping and parking.

Therefore, the Project would not impair implementation or interfere with adopted emergency response or evacuation plans. Impacts would be less than significant.

7.9.7 WILDLAND FIRES
Impact Finding: The Project would not expose people or structures, either directly or indirectly to a significant risk of loss, injury or death involving wildland fires (Draft EIR Page 5.8-19).

Facts in Support of Finding: The Project site is located in an undeveloped area that is not within an identified wildland fire hazard area or an area where residences are intermixed with wildlands. According to the CAL Fire Hazard Severity Zone Map, the Project site is categorized as a Local Responsibility Area (LRA) (CALFire, 2023). Further, Project implementation would require adherence to Chapter 15.04 Building Codes of the

Page 185 ends

KISS Logistics Center Project

City of Hesperia 58
Findings of Fact
December 2023
City Development Code which contain the adoption of the California Fire Codes to reduce potential fire hazards. The Project would also be required to comply with guidelines from San Bernardino County Fire related to fire prevention and subject to review during the plan check process by the City Building Division.

Therefore, the Project would not expose people or structures to a significant risk of loss, injury, or death from wildfires, and there would be no impacts.

7.9.8 CUMULATIVE HAZARDS AND HAZARDOUS MATERIALS IMPACTS Impact Finding: The Project would not result in cumulative impacts related to hazards or hazardous materials (Draft EIR Page 5.8-19.

Facts in Support of Finding: The cumulative study area for the purposes of hazardous materials and waste would be considered the City of Hesperia. This cumulative impact analysis for hazards and hazardous materials considers development of the proposed Project in conjunction with other development projects as well as the projects identified in Draft EIR Section 5.0, Environmental Impact Analysis, Table 5-1, Cumulative Projects. None of the projects identified in D raft EIR Table 5 -1 are proposed adjacent to the Project site.

However, there are multiple cumulative projects within the Hesperia area, in the general vicinity of the Project.

Cumulative land use changes within the City of Hesperia would have the potentia l to expose future area residents, employees, and visitors to chemical hazards through the transport, storage, or use of hazardous materials. The severity of potential hazards for individual projects would depend upon the location, type, and size of development and the specific hazards associated with individual sites. All hazardous materials users and transporters, as well as hazardous waste generators and disposers are subject to regulations that require proper transport, handling, use, storage, and disposal of such materials to ensure public safety. Thus, if hazardous materials are found to be present on future project sites, appropriate remediation activities would be required pursuant to standard federal, state, and regional regulations. Compliance with the relevant federal, state, and local regulations, during the operation and construction throughout the Project site, as well as during the construction and operation of related projects would ensure that cumulative impacts from hazardous materials would be less than significant.

7.10 HYDROLOGY AND WATER QUALITY

7.10.1 VIOLATE WATER QUALITY STANDARDS OR WASTE DISCHARGE

REQUIREMENTS
Impact Finding: The Project would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality (Draft EIR Page 5.9-10).

Facts in Support of Finding:

Construction
Water quality impacts during construction of the Project would be prevented through the requirements of the existing NPDES Construction General Permit, as included in the City’s Chapter 8.30, and PPP WQ -1, which establishes minimum stormwater management re quirements and controls that are required to be implemented for construction of the proposed Project, including preparation of a SWPPP by a Qualified SWPPP Developer (QSD). Therefore, compliance with the State Construction General Permit, Order No. 2009-0009-DWQ, as amended by 2010 -0014-DWQ and 2012 -0006-DWQ, the City of Hesperia Municipal Code, and other applicable requirements, which would be verified during the City’s construction permitting process, would ensure that Project impacts related to construct ion activities resulting in a degradation of water quality would be less than significant.

Page 186 ends

KISS Logistics Center Project

City of Hesperia 59
Findings of Fact
December 2023
Operation
As previously mentioned, the Project site is within the Mojave River watershed and drains to the Upper Mojave reach (Forks Reservoir Outlet to the Upper N arrows). The Mojave River (Forks Reservoir Outlet to the Upper Narrows) is classified as an impaired water body and has been placed on the 303(d) list of impaired waters for Sulfates, Fluoride, and Sodium (toxic inorganics and salinity/total dissolved solids/chlorides/sulfates).

The proposed Project would include development of a one -story, 655,468 SF warehouse building on the

29.61-acre site and the extension of sewer and water lines over 1.3 linear acres. Additional improvements would include landscaping , sidewalks, utility connections, implementation of stormwater facilities, and pavement of parking areas and driveways. The existing Project is vacant and undeveloped. The proposed development would add 1,149,815 SF of impervious surface area, with approximately 16.5 percent of the Project site including pervious landscaping.

Increases in impervious surface area would result in an increase in the volume and flow rate of surface runoff and potential pollutants from vehicles. Operation of the proposed land u ses could generate pollutants including trash, debris, oil residue, and other residue that could be deposited on streets, sidewalks, which have the potential to further exacerbate existing impairments of local water bodies. Proposed drainage improvements would include construction of onsite conveyance, including catch basins and roof drains that route flows to underground pipes. In the post -project condition, the drainage characteristics would be maintained similar to the pre-Project condition. Runoff from the site will be collected via a proposed on-site private storm drain system (including catch basins and storm drainpipes) and conveyed to the linear detention basin proposed within the northern portion of the Project site. The proposed storm water management system would consist of an above -ground hybrid infiltration/bioinfiltration basin. The stormwater infrastructure would capture and treat the 100 -year, 24 -hour storm. This proposed system would address the San Bernardino County Phase II Small MS4 Genera l Permit for the Mojave River Watershed requirements and design capture volume (DCV) (85th percentile, 24-hour storm). The City of Hesperia Engineering Department requested that the applicant provide capture of the 100 -year, 24-hour storm, which exceeds existing San Bernardino County requirements.

Implementation of the proposed Project would comply with BMPs pursuant to the County’s NPDES requirements, and the City Code. The Project would be required to implement a WQMP pursuant to Chapter

8.30 of the City of Hesperia Municipal Code and included as PPP WQ -2. Post construction BMPs and LID included in the WQMP would avoid potential quality degradation of receiving waters resulting from proposed development. As part of the permitting approval process, construction plans would be required to demonstrate compliance with these regulations. Plans for grading, drainage, erosion control and water quality would be reviewed by the City Public Works Department prior to issuance of grading permits to ensure that the applicable and required LID BMPs are constructed during implementation of the Project.

Additionally, BMPs would include non-structural water quality controls to further minimize potential of water quality degradation of receiving waters. Overall, adherence to the existing regulations as implemented by the City Code would ensure that Project impacts related to degradation of water quality from operational activities would be less than significant.

REGULATORY REQUIREMENTS
PPP WQ-1: NPDES/SWPPP. As previously listed.

PPP WQ-2: WQMP. As previously listed.

Page 187 ends

KISS Logistics Center Project

City of Hesperia 60
Findings of Fact
December 2023

7.10.2 DEPLETE GROUNDWATER SUPPLIES OR INTERFERE WITH

GROUNDWATER RECHARGE
Impact Finding: The Project would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the Project may impede sustainable groundwater management of the Basin (Draft EIR Page 5.9-12).

Facts in Support of Finding: The Project site is underlain by the Upper Mojave River Basin, which is fully adjudicated and managed by the Mojave Water Agenc y (Watermaster). The Mojave Water Agency is a low priority basin that is not required to form a groundwater sustainability agency (GSA) or groundwater sustainability plan (GSP). Additionally, Mojave Water Agency is exempt from this requirement due to the adjudication. Therefore, the Project would not conflict with the Sustainable Groundwater Management Act (SGMA).

Hesperia’s primary water supply is pumped water from the Alto subarea of the Mojave Basin. The Project proposes a Specific Plan Amendment to chan ge the Project site’s MSFC -SP designation from NC to CIBP.

However, as discussed in the Urban Water Management Plan (UWMP), Hesperia only extracts as much groundwater as is necessary to meet customer demands. Additionally, the Mojave Basin is adjudicated, and groundwater is pumped and allocated based on the codified allocations. Thus, the proposed Specific Plan Amendment would not result in a substantial decrease in water supplies and would not conflict with determinations of the UWMP.

Currently, the Project site is undeveloped and pervious which allows for groundwater recharge. The proposed Project would result in the addition of 1,149,815 SF of impervious surface area. According to the Mojave River Watershed Technical Guidance Document for Water Quality Management Plans , LID infiltration BMPs must be used to capture and infiltrate the 85th percentile, 24-hour precipitation event. Runoff from the site would be collected via a proposed on -site private storm drain system (including catch basins and s torm drainpipes) and conveyed to the linear detention basin proposed within the northern portion of the Project site. The proposed storm water management system would consist of an above -ground hybrid infiltration/bioinfiltration basin. The stormwater infr astructure would capture and treat the 100 -year, 24- hour storm, an excess of the regional NDPES MS4 Permit requirement to capture and infiltrate the 85th percentile, 24-hour storm. In addition, vegetated landscaping has also been incorporated into the Proj ect design to capture, treat, and infiltrate stormwater. As specified in the Preliminary WQMP (Appendix K), the infiltration capability of the Project site is adequate based on applicable permit requirements. The Project would decrease the total pervious a rea and increase the infiltration rate within proposed pervious areas.

The proposed stormwater system would provide similar infiltration and groundwater recharge capabilities to existing conditions. Therefore, the Project would not substantially impede gro undwater recharge of the Project site.

Compliance with the MS4 permit requirements, the City Code, and other applicable requirements implemented through the WQMP, which would be verified during the Project permitting process, would ensure that Project impacts related to groundwater depletion and recharge would be less than significant.

7.10.3 EROSION OR SILTATION
Impact Finding: The Project would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site (Draft EIR Page 5.9-13).

Page 188 ends

KISS Logistics Center Project

City of Hesperia 61
Findings of Fact
December 2023
Facts in Support of Finding:

Construction
Construction of the Project would require site clearing and grading. Excavatio n, grading, and other site preparation activities would loosen soils, which has the potential to result in erosion and the loss of topsoil.

Also, the Project site is generally flat and does not contain substantial slopes that could induce erosion or siltation. The existing NPDES Construction General Permit, included as PPP WQ-1, requires preparation and implementation of a SWPPP by a Qualified SWPPP Developer for construction activities that disturb one acre or more of soil. The SWPPP is required to address site-specific conditions related to potential sources of sedimentation and erosion and would list the required BMPs that are necessary to reduce or eliminate the potential of erosion or alteration of a drainage pattern during construction activities.

Overall, with implementation of the existing construction regulations that would be verified by the City during the permitting approval process, impacts related to alteration of an existing drainage pattern during construction that could result in substantial erosion or siltation would be less than significant.

Operation
The existing drainage pattern for the site generally flows from the south to the north. Runoff from the site would be collected via a proposed onsite private storm drain system (including catch basins and storm drainpipes) and conveyed in the northerly dir ection to a proposed storm water management system. The detention basin would contain dry wells that would treat the stormwater collected from the Project site. In the post-project condition, the drainage characteristics would be maintained as similar to t he pre-Project condition.

The Project site would be mostly developed with impervious surfaces and undeveloped areas would be vegetated, minimizing the potential for erosion or siltation on site. As previously discussed, the Project would include implementation of BMPs designed to fully capture and infiltrate the Project’s DCV, reducing offsite stormwater flows. As part of the permitting approval process, the proposed drainage and water quality design and engineering plans would be reviewed by the City Depa rtment of Public Works to ensure that they meet the County’s NPDES Permit and limit the potential for erosion and siltation. Therefore, impacts related to alteration of a drainage pattern and erosion/siltation from operational activities would be less than significant.

REGULATORY REQUIREMENTS
PPP WQ-1: NPDES/SWPPP. As previously listed.

PPP WQ-2: WQMP. As previously listed.

7.10.4 SURFACE RUNOFF
Impact Finding: The Project would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or through the addition of impervious surfaces, in a manner which would substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site (Draft EIR Page 5.9-14).

Facts in Support of Finding:

Construction
Construction of the proposed Project would include activities that could temporarily alter the existing drainage pattern of the site, for example by constructing foundations and paved areas, and could result in flooding on - or off -site if drainage is not properly controlled. However, as described previously, implementation of the Project requires a SWPPP that would address site-specific drainage issues related to

Page 189 ends

KISS Logistics Center Project

City of Hesperia 62
Findings of Fact
December 2023
construction of the Project and would include BMPs to eliminate the potential of flooding or alteration of a drainage pattern during construction activities. This includes diverting runoff from rooftops and other impervious surfaces to vegetated areas, when possible, to promote infiltration and controlling the perimeter of the site using sandbags, berms, and silt fencing. Therefore, impacts would be less than significant.

Operation
The proposed Project would result in an increase in impervious area whic h would increase surface flows compared to existing conditions. However, installation of new stormwater facilities, including aboveground and underground stormwater basins, pervious landscaped areas, and new storm drains would be installed.

The proposed stormwater drainage system would collect onsite flows via a series of catch basins and storm drains.

Proposed onsite stormwater infrastructure has capacity to treat and detain 100 percent of the WQMP DCV.

In addition, stormwater runoff would be directed towards landscaped areas wherever possible for treatment and infiltration. The aboveground and underground storage facilities are expected to retain and infiltrate the 100-year 24-hour storm. The use of the detention basin and landscaping would regulate the ra te and velocity of stormwater flows and would control the amount of discharge into the offsite drainage system. As determined by the Preliminary WQMP (Appendix K) and Preliminary Hydrology Report (Appendix I), the proposed drainage improvements would sligh tly maintain peak flow rates for a 100 -year storm from existing conditions of 59.10 cubic feet per second (cfs). Proposed hydromodifications would be consistent with County requirements within the San Bernardino County Hydrology Manual flow requirements. A s determined by the Preliminary WQMP (Appendix K) and Preliminary Hydrology Report (Appendix I), the proposed Project would not result in flooding conditions to upstream or downstream properties with the proposed improvements. As part of the permitting app roval process, the proposed drainage and water quality design and engineering plans would be reviewed by the City Department of Public Works to ensure that they meet the County NPDES Permit requirements and would not result in flood impacts.

Overall, the drainage facilities proposed for the Project have been sized to be consistent with the County MS4 permit requirements. Thus, implementation of the Project would not substantially increase the rate or amount of surface runoff, such that flooding would occur. Impacts would be less than significant.

REGULATORY REQUIREMENTS
PPP WQ-1: NPDES/SWPPP. As previously listed.

PPP WQ-2: WQMP. As previously listed.

7.10.5 STORMWATER SYSTEM CAPACITY
Impact Finding: The Project would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff (Draft EIR Page 5.9-15).

Facts in Support of Finding: The proposed Project would develop an undeveloped site, which would result in the addition of 1,149,815 SF of impervious surface area. Existing Project site drainages sheet flows from the south to the north of the Project site. Flows discharge to the Oro Grande Wash southeast of the Project site.

Use of the aboveground and underground storage chambers would r egulate the rate and velocity of stormwater flows and would control the amount of discharge into the off-site drainage system. As discussed

Page 190 ends

KISS Logistics Center Project

City of Hesperia 63
Findings of Fact
December 2023
above, stormwater runoff would be treated via biotreatment, and the Project would not result in significant impacts related to water quality. In addition, the drainage facilities proposed for the Project have been sized to adequately accommodate the stormwater flows from the proposed development and are consistent with the County drainage plans and MS4 permit requiremen ts. The proposed stormwater system would accommodate existing stormwater infrastructure capacity by holding the entire DCV and allowing high flows to discharge from the site at a reduced flowrate. The existing drainage pattern would be maintained, and peak flow rates would slightly maintain. However, the proposed drainage improvements would be consistent with County standards and permit requirements. Therefore, Project impacts would be less than significant.

7.10.6 IMPEDE OR REDIRECT FLOOD FLOWS
Impact Finding: The Project would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would impede or redirect flood flows (Draft EIR Page 5.9-16).

Facts in Support of Finding:

Construction
The Project site generally slopes south to north. Implementation of the Project would maintain existing drainage patterns of the Project site. Construction of the proposed Project would include activities that could temporarily alter the existing drainage pattern of the site and could result in flooding on - or off-site if drainage is not properly controlled. However, as described previously, implementation of the Pr oject requires a SWPPP that would address site specific drainage issues related to construction of the Project and include BMPs to eliminate the potential of flooding or alteration of a drainage pattern during construction activities. This includes regular monitoring and visual inspections during construction activities. Compliance with the County’s NPDES Permit and a SWPPP, as verified by the City through the construction permitting process, would prevent construction-related impacts related to potential impediment or redirection of flood flows. Therefore, Project impacts would be less than significant.

Operation
Per the Federal Emergency Management Agency (FEMA) Federal Insurance Rate Map (FIRM), the Project is within Zone X, an area determined to be outside of the 0.2 percent annual chance floodplain (Map Number 06071C6475H). As described previously, the proposed Project would result in an increase in impervious areas. As a result, the Project would increase surface flows compared to existing conditions. However, installation of new stormwater drainage facilities, including aboveground and subsurface storage chambers, pervious landscaped areas, and new storm drains would be installed. The proposed drainage system would collect onsite flows via a series of catch basins and subsurface storm drains.

Proposed onsite drainage infrastructure has capacity to retain 100 percent of the site’s DCV. In addition, landscaped areas would accept runoff water from impervious surfaces. The use of the detention chambers and landscaping would regulate the rate and velocity of stormwater flows and would control the amount of discharge into the off -site drainage system. The proposed flowrate would be slightly greater than the existing flowrate; however, the drainage system would be designed consistent with County standards. As part of the permitting approval process, the proposed drainage and water quality design and engineering plans would be reviewed by the City Department of Public Works to ensure that they meet the County NPDES Permit requirements and would not result in flood impacts.

Overall, the drainage facilities proposed for the Project have been sized to be consistent with the County MS4 permit requirements. The Project site is not within an existing floodplain and would not contribute to increased flooding. Thus, implementation of the Project would not substantially impede or redirect flood flows and impacts would be less than significant.

Page 191 ends

KISS Logistics Center Project

City of Hesperia 64
Findings of Fact
December 2023

7.10.7 FLOOD HAZARD, TSUNAMI, OR SEICHE ZONES
Impact Finding: The Project would not be located in flood hazard, tsunami, or seiche ones, and risk release of pollutants due to Project inundation (Draft EIR Page 5.9-17).

Facts in Support of Finding: According to the FIRM, published by FEMA (06071C6475H), the Project site is located in “Zone X”, which is an area located outside of the 100-year and 500-year flood plains.

Tsunamis are large waves that occur in coastal areas; therefore, since the City is not located in a coastal area, no impacts due to tsunamis would occur. Addi tionally, the Project site does not contain and is not adjacent to any water bodies that could seiche. The nearest body of water is Mojave River, approximately nine miles to the east, which is not a contained body of water with seiche potential. Therefore, the Project would result in no impacts related to a flood hazard, tsunami, or seiche or release of pollutants due to Project inundation.

7.10.8 CONFLICT WITH WATER QUALITY CONTROL PLAN OR SUSTAINABLE

GROUNDWATER MANAGEMENT PLAN
Impact Finding: The Project would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan (Draft EIR Page 5.9-16).

Facts in Support of Finding: The Project site is undeveloped, and the proposed Project would result in a substantial increase of imperviousness. The proposed storm drain system is sized to adequately accommodate increased stormwater flows from the Project area and would maintain the existing drainage pattern of the site. Runoff would discharge into the onsite deten tion basin, which would retain and slow runoff before its treated by the proposed biotreatment BMP, infiltrating, or being discharged offsite.

The Project would not conflict with SGMA. The City of Hesperia is within the jurisdiction of the Lahontan RWQCB (Region 8) which sets water quality standards for all ground and surface waters within its region through implementation of a Water Quality Control Plan (Basin Plan). This Basin Plan gives direction on the beneficial uses of the state waters within Region 8 , describes the water quality that must be maintained to support such uses, and provides programs, projects, and other actions necessary to achieve the established standards. The County’s NPDES Storm Water Permit, included as City of Hesperia Municipal Code Chapter

08.30, would require proposed projects in the Project area to prepare a WQMP, included as PPP WQ -2.

WQMPs are required to include BMPs for source control, pollution prevention, site design, and structural treatment control BMPs. As part of the permitting approval process, construction plans would be required to demonstrate compliance with these regulations to minimize the potential of the Project to result in a degradation of water quality. Plans for grading, drainage, erosion control and water qu ality would be reviewed by the City Public Works Department prior to issuance of grading permits to ensure compliance.

As discussed under Impact WQ -2, the Mojave River Basin is adjudicated and therefore is not subject to a sustainable groundwater managemen t plan. Thus, the Project would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. Impacts would be less than significant.

REGULATORY REQUIREMENTS
PPP WQ-2: WQMP. As listed previously.

7.10.9 CUMULATIVE HYDROLOGY AND WATER QUALITY IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to hydrology and water quality (Draft EIR Page 5.9-17).

Page 192 ends

KISS Logistics Center Project

City of Hesperia 65
Findings of Fact
December 2023
Facts in Support of Finding: The areas considered for cumulative impacts to h ydrology and water quality are the Mojave River Watershed for drainage and water quality impacts, and the Upper Mojave River Basin for groundwater impacts.

Water Quality: The geographic scope for cumulative impacts related to hydrology and water quality includes the Mojave River Basin watershed because cumulative projects and developments pursuant to the proposed Project could incrementally exacerbate the existing impaired condition and could result in new pollutant-related impairments.

Related developments within the watershed would be required to implement water quality control measures pursuant to the same NPDES General Construction Permit that requires implementation of a SWPPP (for construction), a WQMP (for operation) and BMPs to eliminate or reduce the discharge of pollutants in stormwater discharges, reduce runoff, reduce erosion and sedimentation, and increase filtration and infiltration. The NPDES permit requirements have been set by the SWRCB and implemented by the RWQCB (and Hesperia Municipal Code) to reduce incremental effects of individual projects so that they would not become cumulatively considerable. Therefore, overall potential impacts to water quality associated with present and future development in the watershed would not be cumulatively considerable upon compliance with all applicable laws, permits, ordinances and plans. As detailed previously, the proposed Project would be implemented in compliance with all regulations, as would be verified during the permitting process.

Therefore, cumulative impacts related to water quality would be less than significant.

Drainage: The geographic scope for cumulative impacts related to stormwater drainage includes the geographic area served by the existing stormwater infrastructure for the Project area, from capture of runoff through final discharge points. As described above the proposed Project includes installation of a detention basin that would retain, slow, filter, and infiltrate the 100 -year, 24-hour design stor m. These facilities would retain runoff and reduce erosion and siltation. In addition, pursuant to state and regional regulations that require development projects to maintain pre-project hydrology, no net increase of off-site stormwater flows would occur. As a result, the proposed Project would not generate runoff that could combine with additional runoff from cumulative projects that could cumulatively combine to impact erosion, siltation, flooding, and water quality. Thus, cumulative impacts related to drainage would be less than significant.

Groundwater Basin: The geographic scope for cumulative impacts related to the groundwater basin is the Upper Mojave River Basin. As described above, the proposed Project includes installation of an infiltration chamber that would recharge stormwater into the groundwater basin. In addition, the volume of water that would be needed by the Project is within the anticipated groundwater pumping volumes since the basin is adjudicated. Therefore, the Project would not result in changes to the projected groundwater pumping that would decrease groundwater supplies. As a result, the proposed Project would not generate impacts related to the groundwater basin that have the potential to combine with effects from other projects to become cumulatively considerable. Therefore, cumulative impacts related to the groundwater basin would be less than significant.

7.11 LAND USE AND PLANNING

7.11.1 DIVISION OF AN EXISTING COMMUNITY
Impact Finding: The Project would not physically divide an established community (Draft EIR Page 5.10-11).

Facts in Support of Finding: The physical division of an established community could occur if a major road (expressway or freeway, for example) were built through an existing community or neighborhood, or if a major development was built which was inconsistent with the land uses in the community such that it divided the community. The environmental effects caused by such a facility or land use could include lack of, or disruption of, access to services, schools, or shopping areas.

Page 193 ends

KISS Logistics Center Project

City of Hesperia 66
Findings of Fact
December 2023
The Project site is currently vacant and is surrounded by existing roadways, vacant land, and industrial uses.

The Project site is currently designated for industrial and commercial uses, and with the implementation of a Specific Plan Amendment to redesignate the southern parcel to CIBP, the Project would be consistent with the planned land uses for the site. In addition, the Project does not involve development of roadways or other infrastructure that could divide a community. Therefore, the proposed Project would not divide the physical arrangement of an established community, and no impact would occur.

7.11.2 CONFLICT WITH LAND USE PLANS
Impact Finding: The Project would not cause a significant environmental impact due to conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the Project adopted for the purpose of avoiding or mitigating an environmental effect (Draft EIR Page 5.10-11).

Facts in Support of Finding:

The General Plan currently designates the Project site as Main Street and Freeway Corridor Specific Plan (MSFC-SP). Within the MSFC -SP, the two northerly parcels of the site (APN 3064 -401-03 and -04) are designated Commercial/Industrial Park (CIBP) and the southerly parcel of the site (APN 3064 -401-05) is designated Neighborhood Commercial (NC). The Project is consistent with the Specific Plan designation of CIBP (with approval of a Conditional Use Permit (CUP), as discussed below). Furthermore, the Project involves modifying the southern portion of the Project site’s Specific Plan designation from NC to CIBP which would require a Specific Plan Amendment. Approval of the proposed Specific Plan Amendment and the CUP would make the Project consistent MSFC -SP. Therefore, in consistency with the MSFC -SP, the Project would be consistent with the General Plan. Additionally, the General Plan contains several goals and policies that address land use and planning and are applicable to the Project. An analysis of the Project’s consistency with these goals and policies is provided in the Draft EIR Table 5.10-2 and demonstrates that the proposed Project would not conflict with the General Plan.

With approval of the Conditional Use Permit, the Project would be an allowable use within the CIBP zone.

Additionally, the Project plans would be reviewed by City staff to ensure consistency with all applicable development standards and regulations. Additionally, the MSFC-SP contains several goals and policies that address land use and planning and are applicable to the Pro ject. An analysis of the Project’s consistency with these goals and policies is provided in the Draft EIR Table 5.10-3 and demonstrates that the proposed Project would not conflict with the MSFC-SP.

SCAG’s RTP/SCS policies focus largely on regional transportation and the efficiency of transportation, which are implemented by counties and cities within the SCAG region, as part of the overall planning and maintenance of the regional transportation system. The policies are not directly applicable to the Project. As shown in the Draft EIR Table 5.10 -4, the Project would not conflict with the adopted RTP/SCS. Therefore, impacts would be less than significant.

7.11.3 CUMULATIVE LAND USE IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to land use and planning.

Facts in Support of Finding: While the project requires a Specific Plan amendment to change the zoning of the site, the proposed Project would be consistent with the Specific Plan land use designation and zoning designation after th e amendment. Past and present cumulative projects do not involve amendments that would eliminate application of policies that were adopted for the purpose of avoiding or mitigating environmental effects. Determining whether any future project might include such amendments and determining the cumulative effects of any such amendments would be speculative since it cannot be known what applications that are not currently filed might request. Thus, it is expected that the land uses of cumulative projects would be consistent with policies that avoid an environmental effect; therefore,

Page 194 ends

KISS Logistics Center Project

City of Hesperia 67
Findings of Fact
December 2023
cumulatively considerable impacts from cumulative projects related to policy consistency would be less than significant.

7.12 MINERAL RESOURCES

7.12.1 LOSS OF KNOWN MINERAL RESOURCES
Impact Finding: The Project would not result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state (Initial Study Page 43).

Facts in Support of Findings: The Project would develop the site with a one-story 655,468-SF industrial building. According to the Hesperia General Plan Conservation and Open Space Element, the City of Hesperia currently has not identified any known mineral resources that would be of value to the region and the residents of the state. As a result, no impacts to mineral resources will occur, and this topic was not further analyzed in the Draft EIR.

7.12.2 LOSS OF RESOURCE RECOVERY SITES
Impact Finding: The Project would not result in the loss of availability of a locally-important mineral resource recovery site delineated on the general plan, specific plan, or other land use plan (Initial Study Page 43).

Facts in Support of Findings: As stated above, the Project site does not include a locally important mineral resource. Therefore, impacts related to known mineral resources would not occur from implementation of the Project, and this topic was not further analyzed in the Draft EIR.

7.12.3 CUMULATIVE MINERAL RESOURCE IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to mineral resources.

Facts in Support of Finding: The proposed Project would result in less than significant impacts related to mineral resources. The proposed Project is not located within the vicinity of a known mineral resource or a locally important mineral resource recovery site. Thus, the development of the proposed Project and cumulative projects would not result in a significant impact to mineral resources. Therefore, impacts to mineral resources would be cumulatively less than significant.

7.13 NOISE

7.13.1 TEMPORARY AND PERMANENT NOISE IMPACTS
Impact Finding: The Project would not result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies (Draft EIR Page 5.11-3).

Facts in Support of Finding:

Construction
Noise generated by construction equipment would include a combination of trucks, power tools, concrete mixers, and portable generators that can reach high levels when combined. Construction is expected to occur in the following stages: excavation and gradin g, building construction, architectural coating, paving.

Construction noise would be temporary in nature as the operation of each piece of construction equipment would not be constant throughout the construction day, and equipment would be turned off when not in use.

The typical operating cycle for a piece of construction equipment involves one or two minutes of full power operation followed by three or four minutes at lower power settings.

Page 195 ends

KISS Logistics Center Project

City of Hesperia 68
Findings of Fact
December 2023
Per City Municipal Code Section 16.20.125, noise sources associated with construction activities are exempt from the City’s established noise standards as long as the activities do not take place between the hours of 7:00 p.m. of any one day and to 7:00 a.m. of the next day, or on Sundays or federal holidays. The proposed Project’s construction activities would occur pursuant to these regulations. Thus, the construction activities would be in compliance with the County’s construction-related noise standards.

The project construction composite noise levels at a distance of 50 feet would range from 82 dBA Leq to 88 dBA Leq with the highest noise levels occurring during the site preparation and grading phases, as shown in Draft EIR Table 5.11-4. While construction noise will vary, it is expected that composite noise levels du ring construction at the nearest residential uses southwest of the Project would reach 58 dBA Leq. These predicted noise levels would only occur when all construction equipment is operating simultaneously; and therefore, are conservative assumptions. While construction-related short-term noise levels have the potential to be higher than existing ambient noise levels in the Project area under existing conditions, the noise impacts would no longer occur once Project construction is completed. As shown on Draf t EIR Table 5.11-5, construction noise from the proposed Project at the nearby receptor locations would range from 54 to 58 dBA Leq, which would not exceed the 80 dBA Leq 8 -hour construction noise level criteria as established by the FTA for residential land uses. Therefore, impacts related to construction noise would be less than significant.

Operation
Traffic Noise Impacts: Vehicle noise is a combination of the noise produced by the engine, exhaust, and tires. The level of traffic noise depends on three p rimary factors (1) the volume of traffic, (2) the speed of traffic, and (3) the number of trucks in the flow of traffic. The proposed Project is anticipated to generate approximately 1,941 daily trips, 187 a.m. peak hour trips and 231 p.m. peak hour trips.

As shown in Draft EIR Table 5.11-6, the increase in Project-related traffic noise would be no greater than

1.8 dBA during existing conditions and no greater than 1.6 during opening year conditions which is below the threshold of a 3.0 dBA noise level increase. Therefore, traffic noise impacts from project-related traffic on off-site sensitive receptors would be less than significant, and no mitigation measures are required.

Off-Site Stationary Noise Impacts: Adjacent off-site land uses would be potentially exposed to stationary- source noise impacts from the proposed on-site heating, ventilation, and air conditioning (HVAC) equipment and truck deliveries and loading and unloading activities. To provide a conservative analysis, it is assumed that operations would occur equally during all hours of the day and that half of the 60 loading docks would be active at all times. Additionally, it is assumed that within the peak hour, consistent with the Project’s trip generation, 20 heavy trucks would maneuver to park near or back into one of the proposed loading docks.

Delivery trucks are anticipated to generate a noise level of 75 dBA Leq at 20 feet (see Noise and Vibration Impact Analysis [Appendix J] of the Draft EIR). Maximum noise levels that would occur during the docking process are anticipated to be 86 dBA Lmax at a distance of 20 feet (see Noise and Vibration Impact Analysis [Appendix J] of the Draft EIR). Tables 5.11-7 and 5.11-8 within the Draft EIR show the combined hourly noise levels generated by HVAC equipment and truck delivery activities at the closest offsite land uses. The Project-related noise level impacts would range from 32.4 dBA Leq to 35.4 dBA Leq at the surrounding sensitive receptors. These levels would be below the City’s exterior daytime and nighttime noise standards of 60 dBA Leq and 55 dBA Leq for residential land uses, respectively, as well as the 65 dBA Leq standard for office uses any time of day. Additionally, as shown in Tables 5.11-7 and 5.11-8, the existing daytime ambient noise level is 48.8 dBA Leq while the existing nighttime ambient noise level is 48.7 dBA Leq. As shown in Table 5.11-3 above, the existing ambient noise levels in the Project vicinity range between

68.4 dBA Leq during nighttime and 70.7 dBA Leq during daytime. Therefore, because Project noise levels would not exceed the current ambient noise level by 3 dBA or more, the impact would be less than significant.

Page 196 ends

KISS Logistics Center Project

City of Hesperia 69
Findings of Fact
December 2023

7.13.2 EXCESSIVE GROUNDBOURNE VIBRATION OR GROUNDBOURNE NOISE LEVELS
Impact Finding: The Project would not result in generation of excessive groundborne vibration or groundborne noise levels (Draft EIR Page 5.11-17).

Facts in Support of Finding:

Construction
Construction activities for development of the proposed Project would include demolition, excavation, and grading activities, which have the potential to generate low levels of groundb orne vibration. Based on the reference vibration levels provided by the FTA and the equipment that would be used for the proposed Project, a large bulldozer represents the peak source of vibration with a reference velocity of 0.089 PPV in/sec or 87 VdB of ground-borne vibration when measured at 25 feet, as shown on Draft EIR Table 5.11-

9. Based on typical propagation rates, the vibration level at the nearest offsite structure (885 feet away) would be 0.0004 inch per second PPV (see Draft EIR Table 5.11-10), which is well below the City’s 0.2 PPV inch per second vibration threshold. Therefore, impacts related to construction vibration would be less than significant.

Operation
Operation of the proposed Project would include operation of heavy trucks, deliverie s, and moving trucks, and garbage trucks for solid waste disposal. Truck vibration levels are dependent on vehicle characteristics, load, speed, and pavement conditions. However, vibration levels generated from Project -related traffic within the Project site and on the adjacent roadways are unusual for on -road vehicles because the rubber tires and suspension systems of on-road vehicles provide vibration isolation. Vibration levels generated from Project-related traffic on the adjacent roadways would be less than significant.

7.13.3 EXPOSE PEOPLE RESIDING OR WORKING IN AIRPORT LAND USE PLAN

TO EXCESSIVE NOISE LEVELS
Impact Finding: The Project is not located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, or within two miles of a public airport or public use airport and would not expose people residing or working in the project area to excessive noise levels (Draft EIR Page

5.11-19).

Facts in Support of Finding: The Project site is located approximatel y 6.2 miles northwest of Hesperia Airport. According to Figure II-3, Hesperia Airport – 65 CNEL Noise Contour, of the Hesperia Airport CLUP, the Project site is not located within the 65 dBA CNEL and 60 dBA CNEL noise contours. No other airports exist within the vicinity of the Project. Thus, implementation and development of the Project would not result in a safety hazard or exposure to excessive noise for people residing or working in the area, and impacts would be less than significant.

7.13.4 CUMULATIVE NOISE IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to noise (Draft EIR Page 5. 11- 19).

Facts in Support of Finding: Cumulative noise assessment considers development of the proposed Project in combination with ambient growth and other development projects within the vicinity of the Project area. As noise is a localized phenomenon, and drastically reduces in magnitude as distance from the source increases,

Page 197 ends

KISS Logistics Center Project

City of Hesperia 70
Findings of Fact
December 2023
only projects and ambient growth in the nearby area could combine with the proposed Project to result in cumulative noise impacts.

Development of the proposed Project in combination with the related projects would result in an increase in construction-related and traffic -related noise. However, City Municipal Code Secti on 16.20.125, Noise, requires construction activities to not occur between the hours of 7:00 p.m. and 7:00 a.m. on weekdays, including Saturday, or anytime on Sunday or a federal holiday. Also, construction noise and vibration is localized in nature and decreases substantially with distance. Consequently, in order to achieve a substantial cumulative increase in construction noise and vibration levels, more than one source emitting high levels of construction noise would need to be in close proximity to the proposed Project construction.

The closest cumulative project is the Hesperia Commerce Center II Project, which would be constructed directly to the west and north of the Project site. Construction of the Hesperia Commerce Center II Project was anticipated to commence in 2021 and last through 2023. However, as of February 2023, construction of the Hesperia Commerce Center II Project has not begun. Construction of the proposed Project is anticipated to last approximately 14 months and would occur from Octob er of 2023 to November of 2024. Therefore, construction activities of the two projects could slightly overlap. However, cumulative noise increases due to construction would be temporary and localized. As discussed throughout this section, construction noise from the proposed Project at the nearby receptor locations would range from 54 to 58 dBA Leq, which is comparable to the existing ambient noise levels ranging between 58.1 dBA Leq during nighttime and 70.7 dBA Leq during daytime. Further, the distance from construction activities to nearby receptors is substantial, thus the combined noise levels are anticipated to be less than significant. Therefore, due to the distance from nearby receptors and timing differences between the projects, construction noise and vibration levels from the proposed Project would not combine to become cumulatively considerable, and cumulative noise and vibration impacts associated with construction activities would be less than significant.

Cumulative mobile source noise impacts would occur primarily as a result of increased traffic on local roadways due to the proposed Project and related projects within the study area. Therefore, cumulative traffic-generated noise impacts have been assessed based on the contribution of the proposed Project traffic volumes on the roadways in the Project vicinity. The increase in noise levels associated with the traffic volumes of the proposed Project were previously identified. As detailed, development of the proposed Project would result in noise levels much lower than the 3 dBA threshold. Therefore, the Project would not result in a cumulatively considerable impact when combined with existing and future development. Cumulative impacts would be less than significant.

7.14 POPULATION AND HOUSING

7.14.1 INDUCEMENT POPULATION GROWTH
Impact Finding: The Project would not induce substantial unplanned population growth in an area, either directly or indirectly (Initial Study Page 45).

Facts in Support of Finding: The Project would develop the site with a one -story 655,468-SF industrial building and associated onsite and offsite infrastructure. No habitable structures exist on the site or are being proposed as part of the Project.

The Project would result in an increase in employment at the Project site that c ould lead to a potential population increase in the surrounding area. According to the Southern California Association of Governments (SCAG), the generation rate for employees required for operation of an industrial project is 1 employee for every 1,195 SF of industrial space. Therefore, operation of the Project would require approximately 549 employees.

Page 198 ends

KISS Logistics Center Project

City of Hesperia 71
Findings of Fact
December 2023
According to SCAG’s 2020 -2045 RTP/SCS population and household growth forecast for Hesperia, between 2016 and 2045, SCAG anticipates an employment increase of 23,600 additional jobs (from 22,500 to 46,100), yielding a 105 percent growth rate. SCAG also anticipates a population increase of 74,400 between 2016 and 2045 (from 93,700 to 168,100). The proposed Project would generate the need for approximately 549 employees, which represents approximately 0.74 percent of the forecasted population growth between 2016 and 2045 and approximately 2.33 percent of the forecasted employment growth between 2016 and 2045 for the City. Thus, although the Project would genera te additional long- term employment in the Project area, the new employment opportunities would be within the forecasted and planned growth of the City. Therefore, the Project would result in a less than significant impact related to inducement of substantial unplanned population growth, and this topic was not evaluated in the EIR.

7.14.2 DISPLACEMENT OF EXISTING HOUSING AND PEOPLE
Impact Finding: The Project would not displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere (Initial Study Page 46).

Facts in Support of Finding: The Project site is currently vacant and undeveloped though it has been previously disturbed. No habitable structures exist on the Project site nor are they currently planned for future development of residential uses. Therefore, no impacts would occur, and this topic was not evaluated in the EIR.

7.14.3 CUMULATIVE POPULATION AND HOUSING IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to population and housing.

Facts in Support of Finding: Cumulative impacts regarding population and housing would occur from the development of a combination of projects that induce population growth. Although the Project would result in minimal population growth in the City, the proposed Project would not result in direct population growth as the use proposed is not residential and would not contribute to permanent residency on site. Therefore, the proposed Project would not induce substantial unplanned population growth in an area, either directly or indirectly, and this impact would be considered less than significant. The Project would not involve development of infrastructure or roadways that would indirectly lead to population growth.

The cumulative growth induced by the Project combined with other approved and proposed projects within the City, would not result in substantial population growth beyond that which the City and region has planned.

Therefore, impacts related to population and housing would be cumulatively less than significant.

7.15 PUBLIC SERVICES

NEW OR PHYSICALLY ALTERED GOVERNMENT FACILITIES

7.15.1 FIRE
Impact Finding: The Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered fire service facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios and response times or other performance objectives for fire protection services (Initial Study Page 46).

Facts in Support of Finding: The City of Hesperia contracts with the San Bernardino County Fire Department (SBCFD) for all fire and emergency services. The closest fire station to the Project site is Station 305, located approximately 1.73 miles south of the Project site, at 8331 Caliente Rd, Hesperia, CA 92344. SBCFD operates two additional fire stations within the City: Fire Station 304 (15660 Eucalyptus Street) and Fire Station 302 (17288 Olive Street) (SBCFD 2022).

Page 199 ends

KISS Logistics Center Project

City of Hesperia 72
Findings of Fact
December 2023
According to the Hesperia General Plan, average SBCFD response times are approximately seven minutes and sixteen seconds (Hesperia 2010). Construction and operation of the proposed Project would increase the number of structures and employees in the Project area; however, as previously discussed, the Project would not directly or indirectly induce unplanned population growth in the City.

If needed, fire stations from adjacent cities, such as Victorville and Apple Valley, may respond to emergency calls in Hesperia. Based on the proximity of the Project site to the ex isting SBCFD facilities, the average response times in the Project area, the ability for nearby cities to respond to emergency calls, and the fact that the Project site is already located within SBCFD’s service area, the Project would be adequately served by the SBCFD without the construction of new, or the expansion of existing, facilities.

Overall, it is anticipated that the Project would be adequately served by existing SBCFD facilities, equipment, and personnel. Therefore, impacts would be less than significant, and this topic was not evaluated in the EIR.

7.15.2 POLICE
Impact Finding: The Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered police service facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios and response times or other performance objectives for police services (Initial Study Page 47).

Facts in Support of Finding: The Law enforcement services within the City are provided via a contract with the San Bernardino County Sheriff’s Department which serves the community from one police station. The Hesperia Police Department is located at 15840 Smoke Tree Street, Hesperia, CA 92345, appr oximately

4.74 miles east of the Project site. According to the City of Hesperia, the Hesperia Police Department is comprised of approximately 58 law enforcement personnel, including one captain, one lieutenant, seven sergeants, five detectives, and 44 deputy sheriffs (City of Hesperia 2022).

The Project is not anticipated to directly or indirectly induce unplanned population growth in the City.

Although the Project could potentially result in a slight incremental increase in calls for service to the Project site compared to existing conditions, this increase is expected to be nominal (as opposed to new residential or commercial/retail land uses, which do result in greater increase in calls for service) and would not result in the need for new police protection facilities.

In summary, it is anticipated that the Project would be adequately served by existing San Bernardino County Sheriff’s Department facilities, equipment, and personnel. Therefore, impacts would be less than significant, and this topic was not further analyzed in the Draft EIR.

7.15.3 SCHOOLS
Impact Finding: The Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered school facilities, the construction of which could cause signific ant environmental impacts (Initial Study Page 47).

Facts in Support of Finding: The Project consists of a warehouse facility that would not directly generate students. The Project is not anticipated to generate a new population, as the employees needed to operate the Project are anticipated to come from within the Project region and substantial in-migration of employees that could generate new students is not anticipated to occur. Thus, the Project would not generate the need for new or physically altered school facilities and impacts would be less than significant.

Additionally, pursuant to Government Code Section 65995 et seq., the need for additional school facilities is addressed through compliance with school impact fee assessment. SB 50 (Chapter 407 of Statutes of

Page 200 ends

KISS Logistics Center Project

City of Hesperia 73
Findings of Fact
December 2023
1998) sets forth a state school facilities construction program that includes restrictions on a local jurisdiction’s ability to condition a project on mitigation of a project’s impacts on school facilities in excess of fees set forth in the Government Code. The Project would be required to contribute fees to the Hesperia Unified School District in accordance with the Leroy F. Greene School Facilities Act of 1998 (Senate Bill 50). Pursuant to Senate Bill 50, payment of school impact fees constitutes complete mitigation under CEQA for Project‐related impacts to school services. Therefore, impacts would be less than significant, and this topic was not further analyzed in the Draft EIR.

7.15.4 PARKS
Impact Finding: The Project would not result in substanti al adverse physical impacts associated with the provision of new or physically altered park facilities, the construction of which could cause significant environmental impacts (Initial Study Page 47).

Facts in Support of Finding: The site is served by the City of Hesperia Recreation and Parks District.

Typically, residential development increases the need for new parks and increases the use of existing citywide park facilities. The proposed Project involves development of an industrial warehouse and would not directly provide new housing opportunities and new residents to the area. Although new employees may occasionally use local parks, such increase in use would be limited and would not result in deterioration to facilities such that the construction or expansion of recreational facilities would be necessary. Therefore, any increased demand on the public parks within the city would be considered a less than significant impact, and this topic and this topic was not further analyzed in the Draft EIR.

7.15.5 OTHER PUBLIC FACILITIES
Impact Finding: The Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered police service facilities, the construction of which could cause significant environmental impac ts, in order to maintain acceptable service ratios and response times or other performance objectives for police services (Initial Study Page 48).

Facts in Support of Finding: The proposed Project involves construction and operation of a new warehouse facility and would not provide new housing opportunities to the area. The proposed Project is not likely to create a significant increase in the use of other public facilities such as libraries, community centers, post offices or animal shelters. Therefore, im pacts are considered less than significant, and this topic was not further analyzed in the Draft EIR.

7.15.6 CUMULATIVE PUBLIC SERVICES IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to public services.

Facts in Support of Find ing: The proposed Project would have less -than-significant impacts on public services. Potential cumulative effects may arise from the aggregation of service demands from development of the proposed Project and with other approved and proposed projects within the City. However, projects within the City including the proposed would be required to contribute development fees specific to public services including fire and police services, schools, parks, and other facilities. As a result, the Project's cumulative impacts on public services are less than significant.

Page 201 ends

KISS Logistics Center Project

City of Hesperia 74
Findings of Fact
December 2023

7.16 RECREATION

7.16.1 EXISTING RECREATIONAL FACILITIES
Impact Finding: The Project would not result in increased use of existing neighborhood and regional parks or other recreational facilities such that subst antial physical deterioration of the facility would occur or be accelerated (Initial Study Page 49).

Facts in Support of Finding: The proposed Project would construct a warehouse facility. Implementation of the proposed Project would not directly increase housing or population, which typically cause an increase in the demand for, and use of, existing neighborhood parks and other citywide recreational facilities. Although new employees may occasionally increase the use of existing local parks, neighborhood and regional parks, employees’ limited use would not result in deterioration to facilities such that the construction or expansion of recreational facilities would be necessary. Any impacts related to the physical deterioration of existing recreation parks or facilities would be less than significant, and this topic was not further analyzed in the Draft EIR.

7.16.2 EXPANDED AND NEW RECREATIONAL FACILITIES
Impact Finding: The Project would not include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment (Initial Study Page 49).

Facts in Support of Finding: The proposed Project would construct a new warehouse facility. As described above, the indirect increase in popu lation as a result of new employment opportunities would not result in use of recreational facilities sufficient to cause deterioration such that the construction or expansion of recreational facilities would be necessary. Therefore, there would be less than significant impacts associated with recreational facilities, and this topic was not further analyzed in the Draft EIR.

7.16.3 CUMULATIVE RECREATIONAL IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to recreation.

Facts in Support of Finding: Combined projects would lead to a significant cumulative impact in the use of parks and recreational facilities. However, the indirect increase in population as a result of new employment opportunities from combined development including the proposed warehouse facility would not result in use of recreational facilities sufficient to cause deterioration such that the construction or expansion of recreational facilities would be necessary. As previously discussed, the growth projection would be consistent with SCAG’s growth projections for the City. Thus, would not result in substantial physical deterioration of existing facilities or require expansion of recreational facilities. As a result, cumulative impacts related to recreation would be less than significant.

7.17 TRANSPORTATION

7.17.1 CONFLICT WITH CIRCULATION SYSTEM PLAN, ORDINANCE, OR POLICY Impact Finding: The Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities (Draft Subsequent EIR at p.

5.8-13). Impacts are less than significant (Draft EIR Page 5.12-5).

Facts in Support of Finding: The Project would be consistent with the applicable goals and policies of the General Plan Circulation Element, the Main Street Freeway Corridor Specific Plan (MSFCSP), and the Regional Transportation Plan/Sustainable Community Strategy (RTP/SCS) as shown in Draft EIR Figure 5.12-

Page 202 ends

KISS Logistics Center Project

City of Hesperia 75
Findings of Fact
December 2023

1. The Project would not hinder the City’s ability to develop a sa fe, efficient, convenient, and attractive transportation system throughout the community. The Project would include construction of ‘A’ Street which would extend from Phelan Road, approximately 630 feet south of the Project site, to Yucca Terrace Drive, approximately 930 feet north of the Project site. The roadways would be built to half width (35 feet). The proposed driveways off ‘A’ Street would be 40 feet wide and provide access for trucks, passenger vehicles, and emergency vehicles. Internal circulation would be provided via 40-foot drive aisles.

Additionally, the Project would be served by VVTA. This existing transit service would continue to serve its ridership in the area and may also serve employees of the Project site. The proposed Project would not alter or conflict with existing transit stops and schedules, and impacts relat ed to transit services would not occur.

There are currently no plans for future bicycle infrastructure within the Project area. The proposed Project would not conflict with plans to implement Class II facilities and impacts related to bicycle facilities would not occur. A 12 -foot sidewalk would be constructed along the proposed ‘A’ Street and Yucca Terrace Drive.

Sidewalk area would be dedicated to the City as part of the Project. There are currently no plans for future pedestrian infrastructure connections within the Project area. Therefore, the proposed Project would not conflict with a plan, ordinance, or policy addressing roadway circulation, and impacts would be less than significant.

7.17.2 DESIGN HAZARD
Impact Finding: The Project would not result in not substantially increase hazards due to a geometric design feature (E.G., sharp curve or dangerous intersections) or incompatible uses (E.G., farm equipment). Impacts are less than significant (Draft EIR Page 5.12-5).

Facts in Support of Finding: Access to the Project site would be provided via two unsignalized full -access driveways along the proposed ‘A’ Street. Both driveways would accommodate trucks, passenger vehicles, and emergency vehicles. Internal circulation would be provided via 40-foot drive aisles. Trucks are expected to primarily utilize Phelan Road, US 395, I-15, and Joshua Road, which are all designated truck routes within the city.

Proposed roadway improvements as required by the Project are summarized below. All roadway improvements would be cons tructed in accordance with all applicable local, state, and federal roadway standards and practices.
• 'A' Street would be built to a 35 -foot half width along the west side of the Project. The proposed roadway would extend from Phelan Road, approximately 630 feet south of the Project site, to Yucca Terrace Drive, approximately 930 feet north of the Project site. • Yucca Terrace Drive would be built to a 35-foot half width approximately 930 feet north of the Project site.
• The Project would construct 12-foot sidewalks along the proposed ‘A’ Street and Yucca Terrace Drive.

Roadway design would conform with City Development Design Standards for internal access and local roadway improvements. Future improvements related to Caltrans facilities (US 395 and I -15) would go through an additional process to ensure interchange and ramp configurations are consistent with Caltrans design standards. Design would be confirmed during the plan check process through the City prior to issuance of a grading permit and Project approval. The Project would not result in a non-standard geometric design feature or an incompatible use that could result in a traffic safety hazard. Therefore, the Project would result in a less than significant impact.

7.17.3 EMERGENCY ACCESS
Impact Finding: The Project would not result in inadequate emergency access (Draft EIR Page 5.12-15).

Page 203 ends

KISS Logistics Center Project

City of Hesperia 76
Findings of Fact
December 2023
Facts in Support of Finding: The proposed construction activities, including equipment and supply staging and storage, would occur within the Project site, and would not restri ct access of emergency vehicles to the Project site or adjacent areas. The installation of new roadway extensions ('A' Street and Yucca Terrace Drive), driveways and offsite utility improvements that would be implemented during construction of the proposed Project could require the temporary closure of one side or portions of roadways for a short period of time (i.e., hours or a few days). However, the construction activities would be required to ensure emergency access in accordance with Section 503 of the California Fire Code (Title 24, California Code of Regulations, Part 9), which would be ensured through the City’s permitting process. Additionally, all potential road closures would be subject to review and approval by the City, including issuance of an encroachment permit. Once the offsite utility improvements are completed, all road conditions would be restored to normal. Operation of the proposed Project would not result in inadequate emergency access or access to nearby uses. Direct access to the Project site would be provided from ‘A’ Street, which is adjacent to the Project site. The Project applicant is also required to design and construct internal access and provide fire suppression facilities (e.g., hydrants and sprinklers) in conformance with Ci ty Ordinances. Additionally, City’s Fire Department would review the development plans prior to approval to ensure adequate emergency access pursuant to the requirements in the International Fire Code and Section 503 of the California Fire Code (Title 24, California Code of Regulations, Part 9). As part of internal emergency access, the Project includes a 40-foot-wide fire lane to ensure adequate emergency access. As a result, the proposed Project would not result in inadequate emergency access or access to nearby uses, and no impacts would occur.

7.18 UTILITIES AND SERVICE SYSTEMS

7.18.1 REQUIRE OR RESULT IN THE CONSTRUCTION OF NEW WATER,

WASTEWATER TREATMENT, STORMWATER DRAINAGE, ELECTRIC

POWER, NATURAL GAS, OR TELECOMMUNICATIONS FACILITIES
Impact Finding: The Project would not require or result in the relocation or construction of new water facilities, or expansion of existing facilities, the construction of which could cause significant environmental effects (Draft EIR Page 5.14-7 through 5.14-18).

Facts in Support of Finding: The Project includes the development of a one -story, 655,468 SF warehouse and manufacturing facility on the 29.61 -acre site. Additional improvements would include landscaping, sidewalks, utility connections, implementation of stormwater faciliti es, and pavement of parking areas and driveways.

Water. The Project site would be served by the HWD water utility. A 16-inch water line would be constructed within the proposed ‘A’ Street right-of-way to the west of the Project site, that would extend approximately 1,300 feet south toward Phelan Road. The proposed water main would then run adjacent to the existing water main within Phalen Road/Main Street for approximately 3,980 feet to Mesa Linda Street. The water main would then continue approximately 2,700 feet south and connect to the existing main at Sultana Street.

The proposed water line within Phelan Road/Main Street and Mesa Linda Street has been approved and will be constructed as part of the adjacent Hesperia Commerce Center II Project (SCH # 2019110418). The Project would be responsible for constructing the portion of water line from along Caliente Road from Phelan Road to Yucca Terrace Road and the connection to the proposed building. The new and existing onsite water system would convey water supplies to the proposed industrial uses, and landscaping through plumbing/landscaping fixtures that are compliant with the CalGreen Plumbing Code for efficient use of water. Additionally, the District would have sufficient water supplies to serve the Project during normal, dry, and multiple dry years as shown in Table 5.14-2: HWD Projected Water Demand and Supply During Normal and Dry Years (AF). The UWMP provides conservative estimates of demand conditions over a five -year drought. The supply availability paired with the slightly increased demand conditions demo nstrate that the HWD has sufficient water supplies to meet five consecutive dry year conditions through 2045. Therefore, the

Page 204 ends

KISS Logistics Center Project

City of Hesperia 77
Findings of Fact
December 2023
proposed Project would not result in the construction of new water facilities or expansion of existing facilities, the construction of which could cause significant environmental effects, and impacts would be less than significant.

Wastewater. Sewer services would be provided to the Project by HWD. Wastewater generated from the Project would be conveyed to the Victor Valley Wastewater Reclamation Authority (VVWRA) via a 3 ‐ mile interceptor that runs along the northeast boundary of the City. VVWRA existing facilities would have sufficient wastewater treatment capacity to serve the Project. Therefore, the proposed Project would not result in the construction of new wastewater facilities or expansion of existing facilities, the construction of which could cause significant environmental effects, and impacts would be less than significant.

Stormwater Drainage. Proposed drainage improvements would include construction of onsite conveyance, including curbs and gutters. Runoff from the site will be collected via a proposed on-site private storm drain system (including catch basins and storm drainpipes) and conveyed north to a proposed stormwater management system. The proposed storm water management system would consist of a detention basin at the north end of the Project site.

The stormwater infrastructure would capture and treat the 100-year, 100-hour storm which would meet and exceed the MS4 General Permit San Bernardino County Phase II Small MS4 General Permit for the Mojave River Watershed requirements. Any excess runoff would follow existing drainage patterns north to Yucca Terrace Road. Therefore, the proposed Project would not result in the construction of new stormwater facilities or expansion of existing facilities, the construction of which could cause significant environmental effects, and impacts would be less than significant.

Solid Waste. The Project would be served by Advance Disposal Company solid waste services. Solid waste would be transported to the Victorville Sanitary Landfill at 18600 Stoddard Wells Road in Victorville as discussed above. The Project would comply with California Code of Regulations Title 24, Part 11; the California Green Building Code, which requires that requires demolition and construction activities to recycle or reuse a minimum of 65 percent of the nonhazardous construction and demolition waste, and AB 341 that requires diversion of a minimum of 75 percent of operational solid waste. Existing solid waste facilities would have sufficient capacity to serve the Project. Therefore, the proposed Project would not result in the construction of new solid waste facilities or expansion of existing facilities, the con struction of which could cause significant environmental effects, and impacts would be less than significant.

Energy and Communications Utilities. Regulated electrical, gas and communication utilities would be extended to the site from existing facilities along Phelan Road. The Project would be served by Southern California Gas, Southern California Edison, and by several private telecommunication providers as requested. Utility providers have existing capacity to serve the Project site. Construction of utility connections to existing utility infrastructure along Phelan Road is included as part of the Project and would not result in any physical environmental effects beyond those identified throughout this Draft EIR. Therefore, the proposed Project would not result in the construction of new utility services or expansion of existing utility facilities, the construction of which could cause significant environmental effects, and impacts would be less than significant.

The construction activities related to the new water, sewer, infrastructure solid waste, energy, and communication infrastructure that would be needed to serve the proposed industrial building is included as part of the Project and would not result in any physical environmental effects beyond those identified throughout this Draft EIR. For example, construction emissions for excavation and installation of the water infrastructure is included in Sections 5.2, Air Quality and 5.7, Greenhouse Gas Emissions. Therefore, the proposed Project would not result in the construction of new water facilities or expansion of existing facilities, the construction of which could cause significant environmental effects, and impacts would be less than significant.

Page 205 ends

KISS Logistics Center Project

City of Hesperia 78
Findings of Fact
December 2023

7.18.2 SUFFICIENT WATER SUPPLIES
Impact Finding: The Project would have sufficient water supplies available to serve the Project and reasonably foreseeable development during normal, dry, and multiple dry years (Draft EIR Page 5.14-7).

Facts in Support of Finding: Water service to the Project site would be provided by the Hesperia Water District (HWD). The Hesperia Water District 2020 Urban Water Management Plan (UWMP), adopted in June 2021, was prepared for the HWD and therefore accounts for the water usage that would be attributed to development of the Project site . As shown in the Draft EIR Table 5.14-2: HWD Projected Water Demand and Supply During Normal and Dry Years (AF), HWD has verified that it has the water supplies available during normal, single-dry, and multiple-dry years within a 20-year projection that would meet the projected demand associated with the Project, in addition to existing and planned future uses.

Additionally, the 2020 UWMP detailed a 2020 water demand of 129 gallons per capita per day.

However, a Project specific Water Supply Assessment (WSA) was prepared for the proposed Project and is included as Appendix X. The WSA states that the water demand rate for the proposed Project is 3,000 gallons per day per acre (Appendix X). . As described previously, the Project includes development of a

29.61-acre site. Thus, the Project would generate an increased water demand of 88,830 gallons per day or 95.5 AF per year, which is within the anticipated increased demand and supply for water from 2020 to 2025, as shown on Draft EIR Table 5.14-2.

It is anticipated that existing and future water entitlements from groundwater and purchased or imported water sources, plus recycling and conservation, would be sufficient to meet the Project's demand at buildout, in addition to forecast demand for HWD's entire service area. Therefore, water demand from the proposed Project would be within the HWD’s current and projected water supplies available to serve the Project and reasonably foreseeable future development during normal, dry, and multiple dry years. In addition, all new developments that connect to the system are required to pay its applicable fair-share Development Impact Fee(s). Thus, impacts related to the need for new or expanded water supplies and entitl ements would be less than significant.

7.18.3 ADEQUATE CAPACITY FOR WASTEWATER TREATMENT
Impact Finding: The Project would not result in a determination by the wastewater treatment provider that would serve the Project that it has inadequate capacity to serve the projects projected demand in addition to the providers existing commitments (Draft EIR Page 5.14-10).

Facts in Support of Finding: VVWRA is the Regional Water Recycling Plant designated to service the City of Hesperia and has a treatment capacity of 18.0 million gallons per day (mgd) which is equivalent to 20,163 AFY (UWMP 2021). According to the UWMP, VVWRA collected and treated approximately 2.0 mgd or 2,240 AF. Under existing conditions, VVWRA has an excess treatment capacity of approximately 16 million gallons per day.

Industrial uses generate approximately 1,700 gallons per day (gpd) per acre of wastewater. Thus, the

29.61-acre Project site would generate approximately 50,337 gpd (0.050 mgd) of wastewater. Therefore, the proposed Project’s wastewater generation would be within the current capacity for the San Bernardino Water Reclamation Facility. As such, the wastewater treatment plant has ample capacity, and the Project would not create the need for any new or expanded wastewater facility (such as conveyance lines, treatment facilities, or lift stations) to serve the proposed Project. Therefore, impacts related to wastewater infrastructure would be less than significant.

Page 206 ends

KISS Logistics Center Project

City of Hesperia 79
Findings of Fact
December 2023

7.18.4 GENERATION OF SOLID WASTE
Impact Finding: The Project would not generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals (Draft EIR Page 5.14-14).

Facts in Support of Finding:

Construction
Victorville Sanitary Landfill would serve the proposed Project and is permitted to accept 3,000 tons of solid waste per day. As of January 2023, Victorville Sanitary Landfill had an average disposal of 1,595.56 tons per day and an average remaining capacity of 1,404 tons per day (CalRecycle 2023).

Utilizing a construction waste factor of 3.89 pounds per square foot (EPA 1998), construction of the proposed Project would result in the generation of approximately 1,275 tons of waste during construction from packaging and discarded materials. However, the 2019 California Green Building Standards Code requires construction activities to recycle or reuse a minimum of 65 percent of the nonhazardous construction and demolition waste. Thus, the construction solid waste that would be disposed of at the landfil l would be approximately 35 percent of the waste generated. Therefore, construction activities would generate approximately 446 tons of waste. As discussed in Section 3.0, Project Description, construction activities would occur over a 14-month period. This equates to approximately 1.05 tons of debris per day. Therefore, the Victorville Sanitary Landfill would be able to accommodate the addition of 1.05 tons of waste during construction.

Operation
The proposed Project would operate an approximately 655,468 square foot industrial building. Using the CalEEMod solid waste generation factor of 0.94 tons per 1,000 square feet per year, operation of the Project would generate approximately 616 tons per year, at least 75 percent of which is required by California law to be recycled, which would reduce the volume of landfilled solid waste to approximately 154 tons per year, or 3.0 tons per week.

As discussed above, Victorville Sanitary Landfill is permitted to accept 3,000 tons of solid waste per day and as of Janu ary 2023 had an average remaining capacity of 1,404 tons per day (CalRecycle 2023).

The Project’s operational solid waste generation would represent a nominal percent of the landfill’s daily remaining capacity. Thus, the proposed Project would be served by a landfill with sufficient permitted capacity to accommodate the Project’s solid waste disposal needs and the Project would not impair the attainment of solid waste reduction goals. Impacts related to landfill capacity would be less than significant.

7.18.5 SOLID WASTE STATUTES AND REGULATIONS
Impact Finding: The Project would comply with federal, state, and local statutes and regulations related to solid waste (Draft EIR Page 5.14-15).

Facts in Support of Finding: The proposed Project would result in new development that would generate an increased amount of solid waste. All solid waste -generating activities within the County is subject to the requirements set forth in the 2019 California Green Building Standards Code that requires demolition and construction activities to recycle or reuse a minimum of 65 percent of the nonhazardous construction and demolition waste, and AB 341 that requires diversion of a minimum of 75 percent of operational solid waste.

Implementation of the proposed Project would be consistent with all state regulations, as ensured through the County’s development project permitting process. Therefore, the proposed Project would comply with all solid waste statute and regulations; and impacts would not occur.

Page 207 ends

KISS Logistics Center Project

City of Hesperia 80
Findings of Fact
December 2023

7.18.6 CUMULATIVE UTILITY AND SERVICES SYSTEM IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to utility and service systems (Draft EIR Page 5.14-19).

Facts in Support of Finding: Cumulative water supply impacts are considered on a water purveyor basis and are associated with the capacity of the infrastructure system and the adequacy of the water purveyor’s infrastructure and primary sources of water that include groundwater, surface water, and purchased or imported water.

As described previously, the Project site would be served by the District’s water utility and connect to existing adjacent water infrastructure. The construction activities related to connecting to the existing water lines that would be needed to serve the proposed Project is included as part of the Project and would not result in any physical environmental effects beyond those identified throughout this Draft EIR. Additionally, the District has shown that they have sufficient water supplies to serve the Project during normal, dry, and multiple dry years as part of their UMWP planning efforts. Water facilities would not need to be expanded or created as a result of the Project and Project impacts would be less than significant. Thus, the Project would not result in cumulatively considerable water utility impacts.

The Project’s wastewater would be treated by VVWRA. The construction activities related to connecting to the existing sewer lines that would be needed to serve the proposed Project is included as part of the Project and would not result in any physical environmental effects beyond those identified throughout this Draft EIR.

The District has determined through their UWMP long term planning efforts that VVWRA would have sufficient capacity to serve wastewater flows generated by the Project. Wa stewater facilities would not need to be expanded or created as a result of the Project and Project impacts would be less than significant.

Thus, the Project would not result in cumulatively considerable wastewater utility impacts.

The proposed storm water management system would consist of an above ground linear earthen basin. The treated controlled low-flow would be infiltrated, while the overflow would be pumped to the outlet at the northeast corner of the site where flows would then follow exiting drain age patterns. In the post -project condition, the drainage characteristics would be maintained as similar to the pre -Project condition. The Project would accommodate the 100-year storm, consistent with the DCV and the County’s stormwater permit.

The Project would not result in the addition of stormwater runoff and pollutants that would exceed capacity of existing stormwater facilities. Additional stormwater facilities would not need to be expanded or created as a result of the Project and Project impacts would be less than significant. Thus, the Project would not result in cumulatively considerable stormwater utility impacts.

Solid waste removal would be provided by Advance Disposal Company and solid waste would be transferred to the Victorville Sanitary Landfill. The landfill is anticipated to have sufficient long-term capacity to serve the Project. Solid waste facilities would not need to be expanded or created as a result of the Project and Project impacts would be less than significant. Thus, the Project w ould not result in cumulatively considerable solid waste facility impacts.

The Project would be served by Southern California Gas and Southern California Edison for gas and electricity, respectively. Additionally, the Project may be served by one or several telecommunication utilities offered in the Project area. These providers would have sufficient capacity to serve the Project. Additional telecommunication facilities would not need to be expanded or created as a result of the Project and Project impacts would be less than significant. Thus, the Project would not result in cumulatively considerable telecommunication utility impacts.

Page 208 ends

KISS Logistics Center Project

City of Hesperia 81
Findings of Fact
December 2023

7.19 WILDFIRE

7.19.1 IMPAIR AN ADOPTED EMERGENCY RESPONSE PLAN
Impact Finding: The Project is not located in or near state responsibility areas or lands classified as very high fire hazard severity zones and would not substantially impair an adopted emergency response plan or emergency evacuation plan (Initial Study Page 53).

Facts in Support of Finding: According to the CalFire Fire Hazard Severity Zone Map for San Bernardino County and Exhibit SF-2 in the City’s Safety Element, the Project site is not within a State Responsibility Area (SRA) or a Very High Fire Hazard Severity Zone. The proposed Project would provide adequate emergency access to the site via two driveways from the proposed public road (‘A’ Street) that would be constructed along the west side of the Project. In the event Project construction requires temporary roadway closures or obstructions, the applicant would be required to prepare and implement a temporary traffic control plan consistent with the 2012 California Manual on Uniform Traffic Control Devices (MUTCD) per City requirements. Access to and from the Project site for emergency vehicles would be reviewed and approved by the San Bernardino County Fire Department and the City as part of the Project approval process to ensure the proposed Project is compliant with all applicable codes and ordinances for emergen cy vehicle access. Since the Project is required to comply with all applicable codes, as verified by the City, any potential impacts related to an emergency response or evacuation would be less than significant. This topic was not further analyzed in the Draft EIR.

7.19.2 EXACERBATE WILDFIRE RISK DUE TO SLOPE, PREVAILING WINDS, AND

OTHER FACTORS
Impact Finding: The Project is not located in or near state responsibility areas or lands classified as a VHFHSZ, and would not involve slope, prevailing winds, and other factors, that could exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire (Initial Study Page 54).

Facts in Support of Finding: As described in the previous response, the Project site is not within a Very High Fire Hazard Severity Zone. Adjacent areas to the Project site are urbanized and do not contain hillsides or other factors that could exacerbate wildfire risks. This topic was not further analyzed in the Draft EIR.

7.19.3 EXACERBATE FIRE RISK FROM INSTALLATION OR MAINTENANCE OF

ASSOCIATED INFRASTRUCTURE
Impact Finding: The Project is not located in or near state responsibility areas or lands classified as a VHFHSZ and would not require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment (Initial Study Page 54).

Facts in Support of Finding: As described in the previous responses, the Project site is not within a Very High Fire Hazard Severity Zone, and the Project does not include infrastructure that could exacerbate fire risks .

Additionally, the Project is located within an urban setting. Therefore, no impact would occur, and this topic was not further analyzed in the Draft EIR.

7.19.4 EXPOSE PEOPLE OR STRUCTURES TO SIGNIFICANT RISKS Impact Finding: The Project is not located in or near state responsibility areas or lands cl assified as a VHFHSZ and would not expose people or structures to significant risks, including downslope or downstream

Page 209 ends

KISS Logistics Center Project

City of Hesperia 82
Findings of Fact
December 2023
flooding or landslides, as a result of runoff, post -fire slope instability, or drainage changes (Initial Study

Page 54 ends

Facts in Support of Finding: As described in the previous responses, the Project site is not within a Very High Fire Hazard Severity Zone. In addition, the Project site is located in a flat area that does not contain or is adjacent to large slopes, and the Project would not generate large slopes. Furthermore, the Project includes installation of onsite and off -site drainage facilities. Thus, the Project would not result in risks related to wildfires or risks related to downslope or downstream flooding or landslides after w ildfires, and this topic was not further analyzed in the Draft EIR.

7.19.5 CUMULATIVE WILDFIRE IMPACTS
Impact Finding: The Project would not result in cumulative impacts related to wildfire.

Facts in Support of Finding: Cumulative wildfire impacts associated with the proposed Project site includes the San Bernardino County area. The Project site and a djacent areas are relatively flat and urbanized in nature and do not contain factors that could exacerbate wildfire risks. The Project, including combined projects in the area, would minimally increase the population and/or activities and potential ignition sources in the area, which may increase the potential of a wildfire. However, CAL FIRE has mapped the Project site and the surrounding area not within a VHFHSZ.

The proposed Project and all projects in the City would be subject to review by City and County building and fire officials and would be required to comply with the City and County Fire Code requirements and regulations related to fire safety, building construction, access, fire flow, and fuel modification. Furthermore, combined projects including the proposed are required to not conflict or physically interfere with an adopted emergency response plan or emergency evacuation plan. Therefore, cumulative impacts related to wildfire would be less than significant.

8.0 FINDINGS ON PROJECT ALTERNATIVES
Key provisions of the State CEQA Guidelines relating to an alternatives analysis (Section 15126.6 et seq.) are summarized below:
• The discussion of alternatives shall focus on alternatives to the Project or its location that are capable of avoiding or substantially lessening any significant effects of the Project, even if these alternatives would impede to some degree the attainment of the Project objectives or would be more costly. • The “No Project” alternative shall be evaluated along with its impact. The “No Project” analysis shall discuss the existing conditions, as well as what would be reasonably expected to occur in the foreseeable future if the Project is not approved.
• The range of alternatives required in an EIR is governed by a “rule of reason”; therefore, the EIR must evaluate only those alternatives necessary to permit a reasoned choice. The alternatives shall be limited to ones that would avoid or substantially lessen any of the significant effects of the Project. • For alternative locations, only locations that would avoid or substantially lessen any of the significant effects of the Project need be considered for inclusion in the EIR. • An EIR need not consider a n alternative if its effects cannot be reasonably ascertained and its implementation is remote and speculative.

8.1 RATIONALE FOR SELECTING POTENTIALLY FEASIBLE ALTERNATIVES The alternatives must include a no-project alternative and a range of reasonable alternatives to the Project if those reasonable alternatives would attain most of the Project objectives while substantially lessening the

Page 210 ends

KISS Logistics Center Project

City of Hesperia 83
Findings of Fact
December 2023
potentially significant project impacts. The range of alternatives discussed in an EIR is governed by a “r ule of reason,” which the State CEQA Guidelines Section 15126.6(f)(3) defines as:
“. . . set[ting] forth only those alternatives necessary to permit a reasoned choice. The alternatives shall be limited to ones that would avoid or substantially lessen any of the significant effects of the Project. Of those alternatives, the EIR need examine in detail only the ones that the lead agency determines could feasibly attain most of the basic objectives of the Project. The range of feasible alternatives shall be sel ected and discussed in a manner to foster meaningful public participation and informed decision-making.”
Among the factors that may be taken into account when addressing the feasibility of alternatives (as described in the State CEQA Guidelines Section 151 26.6(f)([1]) are environmental impacts, site suitability, economic viability, availability of infrastructure, general plan consistency, other plans or regulatory limitations, jurisdictional boundaries, and whether the Project proponent could reasonably acq uire, control, or otherwise have access to an alternative site. An EIR need not consider an alternative if its effects could not be reasonably identified and its implementation is remote or speculative.

For purposes of the EIR analysis, the Project alternatives are evaluated to determine the extent to which they attain the basic Project objectives, while significantly lessening any significant effects of the Project.

8.2 ALTERNATIVES CONSIDERED BUT REJECTED
Pursuant to CEQA Guidelines Section 15126.6(c), an EIR must briefly describe the rationale for selection and rejection of alternatives. The Lead Agency may make an initial determination as to which alternatives are potentially feasible and therefore merit in-depth consideration, and which are infeasible and need not be considered further. Alternatives that are remote or speculative, or the effects of which cannot be reasonably predicted, need not be considered ( CEQA Guidelines Section 15126.6(f)(3)). This section identifies alternatives considered by the Lead Agency but rejected as infeasible and provides a brief explanation of the reasons for their exclusion. Alternatives may be eliminated from detailed consideration in the EIR if they fail to meet most of the Project Objectives, are infeasible, or do not avoid any significant environmental effects.

8.2.1 ALTERNATE SITE ALTERNATIVE
An alternate site for the Project was eliminated from further consideration. The Project’s focus is to provide for an industrial warehouse within an industrializing area of the City of Hesperia that benefits from the US 395 and I -15 corridor’s regional transportation network and generates employment opportunities in proximity to an available labor pool. There are no suitable sites within the control of the Pro ject applicant near the US 395 and I -15 transportation corridors. Therefore, analysis of an alternative site for the proposed Project is neither meaningful nor necessary because the impacts and need for mitigation resulting from the proposed Project would not be avoided or substantially lessened by its implementation.

8.3 ALTERNATIVES SELECTED FOR ANALYSES
The following three alternatives to the Project, No Project/No Build Alternative (Alternative 1) , No Project/Existing Land Use Alternative (Alternative 2) and Reduced Project Alternative (Alternative 3), have been identified for further analysis as representing a reasonable range of alternatives that attain most of the Project Objectives, may avoid or substantially lessen the Project’s significant impact, avoid the need for mitigation, or are feasible from a development perspective. These alternatives have been developed based on the criteria identified in Section 8.1, and are evaluated below.

Page 211 ends

KISS Logistics Center Project

City of Hesperia 84
Findings of Fact
December 2023

8.3.1 ALTERNATIVE 1: NO PROJECT/NO BUILD ALTERNATIVE
Description
Under this alternative, the Project would not be developed, and no development would occur. The Project site would remain vacant and undeveloped . In accordance with the CEQA Guidelines, the No Project/No Build Alternative for a development project on an identifi able property consists of the circumstance under which the project does not proceed. Section 15126.6(e)(3)(B) of the CEQA Guidelines states that, “In certain instances, the no project alternative means ‘no build’ wherein the existing environmental setting is maintained.”
Accordingly, Alternative 1: No Project/No Build provides a comparison between the environmental impacts of the Project in contrast to the result from not approving, or denying, the Project. Thus, this alternative is intended to meet the re quirements of CEQA Guidelines Section 15126.6(e) for evaluation of a no project alternative.

Finding
The City finds that the No Project/ No Build Alternative is infeasible because although it is environmentally superior to the proposed Project, it does not meet any of the Project objectives and it would not realize the benefits of Project implementation.

In making this determination, the City finds that when compared to the alternatives described and evaluated in the Draft EIR, the Proposed Project, as mitigated, provides a reasonable balance between satisfying the Project objectives and reducing potential environmental impacts to an acceptable level.

Aesthetics
Under the No Project/No Build Alternative, no new development would occur within the Project site, and the visual character and quality of the site would be maintained in its existing condition, which includes undeveloped and mostly undisturbed conditions. No structures or landscaping would be introduced on the site. No additional lighting or sources of glare would be installed. No views across the Project site would change. Thus, implementation of the No Project/No Build Alternative would not result in contrast or aesthetic incompatibilities with the existing enviro nment, and no MMs would be required. However, the visual improvements that would be introduced throughout the Project site that include: new and improved landscaping, providing a building of contemporary design, and improvements to the public realm by streetscaping would not be implemented by the No Project/No Build Alternative. Overall, the aesthetic impacts from this alternative would be less than significant and would be reduced in comparison to the Project.

Air Quality
Under the No Project/No Build Alternative, no new development would occur, which means that no grading, construction and building finishing activities and the related emissions would occur either. In addition, by maintaining the existing site as vacant and undeveloped, no new operational trips would occur, which would further reduce the less than significant air quality impacts from the proposed Project. Therefore, overall air quality impacts would be reduced in comparison to the less than significant impacts of the Project.

Biological Resources
Under the No Project/No Build Alternative, the site would remain in its existing condition, which includes vacant and mostly undisturbed land. No grading or development would occur on the site under this alternative and there would be no potential impacts to Joshua Trees, special status wildlife species, or

Page 212 ends

KISS Logistics Center Project

City of Hesperia 85
Findings of Fact
December 2023
migratory and nesting birds. Therefore, the No Project/No Build Alternative would not require implementation of mitigation, and impacts under this alternative would be reduced compared to the Project.

Cultural Resources
Under the No Project/No Build Alternative, the site would remain in its existing condition, which includes vacant and mostly undisturbed land. No grading or development would occur on the site under this alternative and there would be no potential impacts to subsurface cultural, historical, or archaeological resources. Therefore, the No Project/No Build Alternative would avoid site disturbances that could impact resources and would not require mitigation. Thus, Project impacts would not occur under this alternative, and would be reduced compared to the Project.

Energy
The Project site would remain vacant and mostly undisturbed under the No Project/No Build Alternative.

Therefore, there would be no increase in demand for energy. Although the Project demands for Energy were determined to be less than significant, the amount of energy used by the No Project/No Build Alternative would be reduced compared to the Project.

Geology and Soils
No new construction activities, including grading, would occur under this alternative. Thus, there would be no potential for additional workers, building, and structures to experience seismic ground shaking, liquefaction, lateral spreading, subsidence, or collapse within the Project site. Additionally, as no grading activities would occur under this alternative, potential impacts from erosion, loss of topsoil, or to paleontological resources would not occur. While the Project impacts would be less than significant with mitigation incorporated, this alternative would result in less impacts and no MMs are required. Therefore, the No Project/No Build alternative would result in less impacts than the proposed Project.

Greenhouse Gas Emissions
Under the No Project/No Build Alternative, no new development wou ld occur, which means no new development or operational activities would generate GHG emissions. Project impacts related to greenhouse gases would be significant and unavoidable; however, this alternative would not increase greenhouse gases above existing conditions. Therefore, overall GHG impacts would be reduced in comparison to the Project.

Hazards and Hazardous Materials
No new construction activities would occur at the Project site or operation of new high -cube warehouse buildings that would generate, and result in transport of, hazardous materials. As there are no existing structures onsite, there would be no operation onsite that would generate hazardous materials. The No Project/No Build Alternative would not include major construction activities tha t would use typical construction-related hazardous materials. Thus, potential impacts related to use, disposal, and transport of hazardous materials would be avoided by this alternative. While this Draft EIR determined that the Project’s impacts related to hazards and hazardous materials would be less than significant, this alternative would result in less impacts since no grading or construction would occur. Therefore, the No Project/No Build alternative would result in less impacts than the proposed Project.

Hydrology and Water Quality
Existing water quality conditions, groundwater supplies, drainage patterns, and runoff water amounts would remain “as is” under this Alternative as no new development would occur. This alternative would not introduce new sources of water pollutants from either the construction or operation phases of development to the Project site, because no new development would occur. Additionally, this alternative would not require the

Page 213 ends

KISS Logistics Center Project

City of Hesperia 86
Findings of Fact
December 2023
storm drain facility improvements that would be necessary with the Project. However, this alternative would not include installation of new low -impact development (LID) treatment control best management practices (BMPs) to minimize runoff, which would occur by the Project. Storm water leaving the site would continue to contain sediment associated with the existing conditions of the site. Due to the lack of urban activities that would occur by the No Project/No Build Alternative, a reduction in potential pollutants would result.

Therefore, the No Project/No Bu ild Alternative would reduce potential impacts to Hydrology and Water Quality, compared to those that could occur from the Project.

Land Use and Planning
This alternative would not result in new development, and as such, there would be no potential for land uses to be introduced that would indirectly result in environmental impacts due to a conflict with an existing land use plan. Under this alternative a Specific Plan Amendment (SPA) to the MSFC -SP would not be required.

Overall, this alternative would result in no impacts to land use and planning, and therefore, would be less than the Project’s impacts.

Noise
Under this alternative, no development would occur onsite, and no new sources of noise would be introduced.

Since no new development would occur and no traffic trips would be generated, this alternative would not contribute to an incremental increase in area-wide traffic noise levels. In addition, this alternative would not result in construction onsite and no construction noise or vibration would occur. As a result, the No Project/No Build Alternative would not generate any noise. Thus, impacts related to noise would be less than the proposed Project.

Transportation
This alternative would not result in new development, and as such, would not result in any vehicular trips or VMT related to operation of the Project site. As the Project site would not be developed and trips would not be generated, the No Project/No Development alternative would avoid the Project’s significant and unavoidable impact and reduce the Project’s VMT impacts so that mitigation would not be required.

Therefore, the No Project/No Development Alternative would result in less impacts than the proposed Project.

Tribal Cultural Resources
The No Project/No Build Alternative would not develop the Project site. No grading or excavation would occur under this alternative and there would be no potential impacts to subsurface Tribal Cultural Resources that may exist beneath the ground surface. Therefore, the Project’s potential impacts to Tribal Cultural Resources would not occur and MMs would not be required. Thus, impacts under this alternative would be less than the Project.

Utilities and Service Systems
Under this alternative, existing conditions would remain, and no new development would occur. No additional domestic water, wastewater, stormwater drainage, electric power, natural gas, or telecommunication facilities would be needed under this alternative, and there would be no change in the demand for domestic water or wastewater treatment services. This alternative would also not result in increased demand for solid waste collection and disposal. Selection of this alternative would avoid all of the Project’s impacts to utilities and service system providers. While the Project would result in less than significant impacts, this alternative would result in less impacts due to no change in demand of these service systems. Therefore, the No Project/No Development Alternative would result in less impacts than the proposed Project.

Page 214 ends

KISS Logistics Center Project

City of Hesperia 87
Findings of Fact
December 2023
Conclusion
Ability To Reduce Impacts
This alternative would reduce the Project’s significant and unavoidable impacts related to VMT and GHG to no impact. The No Project/No Build Alternative would eliminate less than significant impacts related to the topical sections analyzed in this EIR and would not necessitate identified MMs related to aesthetics, biological resources, cultural resources, geology & soils, paleontological resources, traffic, and tribal cultural resources that would result in the identified impacts being reduced to a less than significant level under the Project.

Ability To Achieve Project Objectives
Implementation of the No Project/No Build Alternative would not implement the proposed development on the Project site, and none of the Project objective s would be achieved under this alternative. The No Project/No Build Alternative would not add to the City’s employment -generating uses or new businesses, would not promote economic growth, would not reduce the need for commuting to employment and would not develop the site for industrial warehousing consistent with the City’s land use designation.

8.3.2 ALTERNATIVE 2: NO PROJECT/EXISTING LAND USE ALTERNATIVE Description
The No Project/Existing Land Use would reduce the intensity of the proposed industrial uses, locate the development on the northern portion of the site, and the remainder of the site would be left in its existing condition. Development under this alternati ve would be consistent with MSFC -SP designation of the two northerly parcels of the site (APN 3064 -401-03 and -04) as Commercial/Industrial Park (CIBP) and the southerly parcel of the site (APN 3064-401-05) as Neighborhood Commercial (NC). Under this alternative, the northern 21.06-acre portion of the site (APN 3064-401-03 and -04) would be developed at a FAR of

0.48 with a 440,339 SF warehouse building (shown on Figure 8-1). A proportional reduction in the amount of loading docks, surface parking area and commensurate number of parking spaces for vehicles and trucks also would occur in the No Project/Existing Land Use. This alternative would implement all offsite improvements proposed under the Project, including the construction of “A” Street along the west side of the Project site and proposed utility improvements. The remaining 8.55 acres (29 percent) of the Project site would remain undeveloped and in its existing condition.

Finding
The City finds that the No Project/Existing Land Use Alternative is inf easible because it would require a similar level of mitigation as the proposed Project. Additionally, although the Reduced Project Alternative would meet the Project objectives, they would not be met to the extent as would be achieved by the Project.

In making this determination, the City finds that when compared to the alternatives described and evaluated in the Draft EIR, the proposed Project, as mitigated, provides a reasonable balance between satisfying the Project objectives and reducing potential environmental impacts to an acceptable level.

Aesthetics
Under the No Project/Existing Land Use, the same type of light industrial warehouse development would occur on the Project site. However, the development would be limited to the northern 21.06-acre portion of the site and the aesthetics of the remaining 8.55 acres (29 percent) of the Project site would remain undeveloped and in its existing condition. The No Project/Existing Land Use would be visually less dense than the proposed Project. The No Project/Existing Land Use would include construction of a building with a smaller footprint, but of the same height and the same architectural character as the Project. Thus, the visual

Page 215 ends

KISS Logistics Center Project

City of Hesperia 88
Findings of Fact
December 2023
character and quality of the developed portion of the site would be slightly less, but similar to the Project, and impacts to visual character and quality would be less than significant.

Because 29 percent of the site would remain as undeveloped under this alternative, and fewer lights would be required to illuminate the exterior of a smaller building and parking lot, the No Project/Existing Land Use would result in fewer sources of light and glare. Overall, implementation of the No Project/Existing Land Use would result in a large area of undeveloped open space on the western portion of the Project site and requires the same MMs as the proposed Project to reduce impacts to a less than significant level. Thus, aesthetic impacts from the No Project/Existing Land Use would be neutral in comparison to the proposed Project.

Air Quality
The No Project/Existing Land Use would reduce the proposed industrial development on the Project site by 29 percent. Therefore, a reduced volume of construction activities and related emissions would occur. In addition, the reduced amount of square footage that would be developed by this alternative would result in less stationary source emissions from equipment on -site, substantially less vehicular trips, and associated emissions than the Project. Therefore, overall air quality impacts would be reduced in comparison to the less than significant impacts of the Project. Thus, this alternative and cumulative impacts under this alternative would be less than the Project.

Biological Resources
The No Project/Existing Land Use would reduce the amount of bu ilding area and associated parking stalls proposed for the Project site. This alternative would largely reduce the impacts to Joshua Trees. As detailed in Draft EIR Section 5.3, Biological Resources, 248 Joshua trees within the Project boundaries (Project site and offsite improvement areas) have the potential to be impacted. The development area of the No Project/Existing Land Use would avoid approximately 50 onsite Joshua trees. Therefore, under the No Project/Existing Land Use, the Project would result in an impact of 198 Joshua trees. Thus, this alternative would result in impacts to avoid impacts to 20 percent of the Joshua trees within the Project area. However, because some Joshua trees would still be impacted by this alternative, Mitigation Measures would continue to be required to reduce impacts to Joshua trees to a less than significant level. Similarly, the area of potential impacts to other sensitive wildlife species would be reduced; however, MMs BIO-1 through BIO-13 would continue to be required to be implemented. Thus, this alternative would result in less than significant impacts with mitigation, but fewer impacts to biological resources compared to the proposed Project.

Cultural And Paleontological Resources
The No Project/Existing Land Use wo uld result in similar impacts to potential undiscovered subsurface archaeological resources within the reduced construction area. Grading and excavation would still be required as part of the construction process; therefore, the same mitigation would be re quired to reduce potential impacts to less than significant. Therefore, impacts to cultural and paleontological resources from the No Project/Existing Land Use would be similar to those associated with the proposed Project.

Energy
Under the No Project/Existing Land Use, approximately 29 percent less building area would be developed within the Project site. This would result in an approximately 29 percent decrease in the demand for energy in comparison to the proposed Project, which was determined to be less than significant. Although the Project demands for energy were determined to be less than significant, the amount of energy used by the No Project/Existing Land Use would be 29 percent less and would comply with the same regulations/incorporate the same measures to ensure no wasteful or inefficient use of energy. Therefore, impacts to energy would

Page 216 ends

KISS Logistics Center Project

City of Hesperia 89
Findings of Fact
December 2023
be less under this alternative than the less than significant impacts that would occur from implementation of the Project.

Greenhouse Gas Emissions
The No Project/Existing Land Use would develop the Project site with the same type of industrial warehouse use, but with a 29 percent reduction in square footage. Therefore, a reduction of construction and related production of GHG emissions would occur, compared to th e proposed Project. In addition, the reduced amount of square footage that would be developed by this alternative would result in less stationary source emissions from equipment on -site, and less vehicular trip associated GHG emissions than the Project. Th e increase in GHG emissions that would be generated from operation of this alternative would be approximately 29 percent less than the proposed Project, which would total approximately 7,514.2 MT CO2e per year. Additionally, proportionally, the Project wou ld still be anticipated to result in similar MT CO2e per year per service population as the Project ( 19.2 MT CO2e) since service population demand would proportionally decrease with building/operation scale. Therefore, the alternative would result in a significant and unavoidable impact, but less of an impact compared to the Project.

Hydrology And Water Quality
The No Project/Existing Land Use would result in a reduced area of impervious surfaces compared to the Project. However, like the proposed Project, this alternative would introduce new sources of water pollutants from warehouse development and operation activities. Additionally, this alternative would be required to include storm drain facility improvements, LID, source control, site design, and treat ment control BMPs that are similar to those that are included in the Project. Therefore, the No Project/Existing Land Use would result in less than significant impacts to hydrology and water quality that are similar to those that would occur from the Project. Overall, hydrology and water quality impacts would be less than significant, and neutral in comparison to the Project.

Land Use and Planning
Under this alternative, approximately 29 percent less area would be developed within the Project site. Like the proposed Project, the Reduced Project alternative would develop the northern parcels zoned as CIBP with a 440,339 SF warehouse and the southern portion of the site designated as NC would remain vacant.

Under this alternative an SPA to the MSFC -SP would not be required. With implementation of measures to address other environmental issues (e.g., biological resources, etc.), potential impacts due to land use compatibility under both the Project and this alternative would remain less than significant. This al ternative would also not physically disrupt or divide the arrangement of an established community. Overall, impacts related to land use and planning from the No Project/Existing Land Use Alternative would be less than significant; and therefore, would be less due to the reduced requirement for an SPA, but consistent with the Project’s impacts.

Noise
Noise impacts would be reduced from the noise impacts of the Project because a smaller building would be constructed, and the construction timeline would be sho rter. Project operational noise impacts would be reduced because this alternative would result in fewer truck trips as the Project, and the stationary noise sources would be reduced in relation to the reduction in warehouse/logistics building square footag e.

Overall, noise impacts from the No Project/Existing Land Use would be less than the Project’s less than significant impacts.

Page 217 ends

KISS Logistics Center Project

City of Hesperia 90
Findings of Fact
December 2023
Transportation
Construction and operation-related traffic and truck trips would be reduced under the No Project/Existing Land Use because this alternative would decrease the Project by 29 percent. Daily vehicular trips would be reduced in relation to the reduction of the building area. Therefore, the No Project/Existing Land Use would result in 911 daily tri ps (see Draft EIR Table 8-1), whereas the Project would result in 1,357 daily trips.

Although the project would be reduced by 29 percent, VMT is measured by employee; therefore, a reduction in project size would not be anticipated to proportionally reduce VMT impacts. T herefore, the Project’s mitigation for cumulative VMT impacts would be required under this alternative and impacts would be significant and unavoidable . Overall, impacts under the No Project/Existing Land Use would remain significant and unavoidable with mitigation, and be slightly less in comparison to the Project due to reduced trips.

Tribal Cultural Resources
Under this alternative, the Project would be reduced by approximately 29 percent. Grading and excavation would still occur under this alternative, therefore, there could be similar impacts to tribal cultural resources and the same MMs would be required for the reduced construction area. Therefore, impacts that could occur by the No Project/Existing Land Use would be similar to those associated with the Project.

Utilities and Service Systems
The No Project/Existing Land Use would reduce the size of the Project by approximately 29 percent. This would reduce the number of employees on the Project site in relation to the reduction of building square footage; and would also reduce demand for utilities from the proposed building. Under this alternative, demand for regional water supplies would be less than that of the Project. Thus, impacts related to water supplies would be less than the l ess than significant impacts that would occur from implementation of the Project. Similarly, solid waste generation would be less than the amount of solid waste generated by the Project and require less landfill capacity. Therefore, impacts to utilities an d service systems under this alternative would result in similar less than significant impacts as the proposed Project.

Conclusion
Ability to Reduce Impacts
Implementation of the No Project/Existing Land Use would meet the Project objectives, but some of t hem would not be met to the extent as would be achieved by the Project, as listed in Draft EIR Table 8-3. The No Project/Existing Land Use would provide for development of a warehouse use on the site; however, the alternative provides approximately 29 percent less of warehouse space than the Project, and it would have the ability to attract less business activity, less economic growth, and fewer local employment opportunities to area residents, and less development of an underutilized site that is designated for development.

Ability to Achieve Project Objectives
The No Project/Existing Land Use would reduce the total graded and developed area which would decrease the impacts related to biological, cultural, paleontological, transportation, and tribal cultura l resources.

However, similar to the Project, this alternative would require MMs to ensure impacts are less than significant.

Consistent with the Project, the No Project/Existing Land Use would result in a significant and unavoidable impact related to greenhouse gas emissions and vehicle miles traveled . However, the volume of impacts would be less with the No Project/Existing Land Use in comparison to the Project. Mitigation for biological resources, cultural resources, paleontological resources, traffic, a nd tribal cultural resources would still be required to reduce the identified potentially significant impacts to less than significant levels. This alternative

Page 218 ends

KISS Logistics Center Project

City of Hesperia 91
Findings of Fact
December 2023
would further reduce the less than impacts related to air quality, greenhouse gas, energy, and n oise.

However, similar to the Project, no mitigation related to these environmental topics are required.

8.3.3 ALTERNATIVE 3: REDUCED PROJECT ALTERNATIVE
Description
The Reduced Project Alternative would reduce the intensity of the proposed industrial uses, loca te the development on the northern portion of the site, and the remainder of the site would be left in its existing condition. Development under this alternative would be consistent with MSFC -SP designation of the two northerly parcels of the site (APN 306 4-401-03 and -04) as Commercial/Industrial Park (CIBP) and the southerly parcel of the site (APN 3064-401-05) as Neighborhood Commercial (NC). Under this alternative, the northern 6.34-acre portion of the site (APN 3064-401-03) would be developed at a FAR of 0.48 with a 132,561 SF warehouse building (including manufacturing and cold storage as proposed under the Project) (see Figure 8 -2). A proportional reduction in the amount of loading docks, surface parking area and commensurate number of parking spaces for vehicles and trucks also would occur in the Reduced Project Alternative. This alternative would implement all offsite improvements proposed under the Project, including the construction of “A” Street along the west side of the Project site and proposed utility improvements. The remaining 23.29 acres (79 percent) of the Project site would remain undeveloped and in its existing condition.

Finding
The City finds that the Reduced Intensity Alternative is infeasible because it would require a similar level of mitigation as the proposed Project. Additionally, although the Reduced Project Alternative would meet the Project objectives, they would not be met to the extent as would be achieved by the Project.

In making this determination, the City finds that when compared to the alternatives described and evaluated in the Draft EIR, the proposed Project, as mitigated, provides a reasonable balance between satisfying the Project objectives and reducing potential environmental impacts to an acceptable level.

Aesthetics
Under the Reduced Project Alternative, the same type of light industrial warehouse development would occur on the Project site. However, the development would be limited to the northern 6.32-acre portion of the site and the aesthetics of the remaining 23.29 acres (79 percent) of the Project site would remain undeveloped and in its existing condition. The Reduced Project Alternative would be visually less dense than the proposed Project. The Reduced Project Alternative would include construction of a building with a smaller footprint, but of the same height and the same architectural character as the Project. Thus, impacts to visual character and quality would be less than significant. Thus, aesthetic impacts from the Reduced Project Alternative would be slightly less proposed Project.

Air Quality
The Reduced Project Alternative would reduce the proposed industrial development on the Project site by 79 percent. Therefore, a reduced volume of construction activities and related emissions would occur. In addition, the reduced amount of square footage that would be developed by this alternative would result in less stationary source emissions from equ ipment on-site, substantially less vehicular trips, and associated emissions than the Project. Therefore, overall air quality impacts would be reduced in comparison to the less than significant impacts of the Project. Thus, this alternative and cumulative impacts under this alternative would be less than the Project.

Page 219 ends