DATE:

May 5, 2026
TO:

Mayor and Council Members
FROM:

Rachel Molina, City Manager
BY:

Orlando Acevedo, Director of Development Services
Ryan Leonard, Principal Planner
Leilani Henry, Associate Planner
SUBJECT:

Conditional Use Permit CUP24-00012; Applicant: AUE Energy LLC; APN: 3064-401-10

RECOMMENDED ACTION
The Planning Commission recommends that the City Council adopt Resolution No. 2026-07 Approving Conditional Use Permit CUP24-00012 and adopting the associated mitigated negative declaration pursuant to the provisions of CEQA.

This item was continued from the April 21, 2026 City Council meeting. Revisions are shown in bold red. At that meeting, a motion was made to continue the item to the next regular meeting and to direct staff to revise the proposed resolution and findings to approve Conditional Use Permit No. CUP24-00012, excluding the proposed car wash use. The motion was approved by a 5-0 vote. Accordingly, Resolution No. 2026-07 has been revised to include findings supporting denial of the car wash component of the project.

BACKGROUND
Proposal: A Conditional Use Permit (CUP) has been filed to allow for the development of a 5,915 square foot convenience store with alcohol sales for off-site consumption along with a 4,080 square foot fueling station canopy with 10 pumps and a 1,968 square foot drive through carwash (Attachments 1 and 2).

Location: This project is located on a 2.36-acre site at the northwest corner of Phelan Road and Highway 395. (Attachment 3).

Current General Plan, Zoning and Land Uses: The site is vacant and within the Neighborhood Commercial (NC) zone of the Main Street and Freeway Corridor Specific Plan. The adjacent properties to the north and west are vacant and located within the Neighborhood Commercial zone (NC). The property to the east, across Highway 395, and the property to the south, across Phelan Road, are also vacant and within the Neighborhood Commercial (NC) zone (Attachment 4).

ISSUES/ANALYSIS
Land Use: The proposed convenience store is a permitted use within the Neighborhood Commercial (NC) zoning district. However, pursuant to the Development Code and the Main Street and Freeway Corridor Specific Plan, approval of a Conditional Use Permit (CUP) is required for the establishment and operation of a vehicle fuel station, carwash facility, and the sale of alcoholic beverages for off-site consumption. Additionally, the City Council adopted Ordinance No. 2017-08 on October 3, 2017, which requires that all applications for off-sale alcohol (type 20 and 21 ABC licenses) for establishments that are below 12,000 square feet in floor area be forwarded to the City Council for final action.

On March 26, 2026, the Planning Commission unanimously forwarded this item to the City Council with a recommendation for approval by a 5-0 vote. There were no residents who spoke either in favor or opposition to the project during the public hearing.

Conformance with Development Standards: The project complies with development standards of the Main Street and Freeway Corridor Specific Plan including the minimum building requirements, landscaping, and parking. Moreover, the project includes 26,572 square feet of total landscape coverage, or 13.5% of total landscape coverage, which is greater than the required minimum landscape coverage of 10%.

Additionally, the project complies with the specific land use standards for vehicle wash facilities, including maintaining a distance exceeding 1,000 feet from existing ancillary and standalone car wash facilities, and meeting all applicable lighting and noise restrictions.

Furthermore, establishments selling alcoholic beverages for off-site consumption are required to be located within 500 feet of the intersection of two arterial or major arterial streets as identified in the City’s adopted Circulation Plan. The proposed project is located at the northwest corner of Phelan Road and Highway 395. Phelan Road is designated as a Major Arterial with a 120-foot-wide ultimate right-of-way, while Highway 395 is designated as a Special Street section with a 130-foot-wide ultimate right-of-way and is identified as a major transportation corridor in the Circulation Plan. As a major regional corridor, Highway 395 satisfies the intent of an arterial roadway classification.

Alcohol Sales: The applicant will file an application for a Type 20 (Off-Sale Beer and Wine) license with the California Department of Alcoholic Beverage Control (ABC). Table 2 identifies four active off-sale alcoholic beverage licenses within Census Tract 100.09 (Attachment 5). ABC authorizes this census tract to have three off-sale licenses. Therefore, approval of CUP24-00012 will exceed the limitation of three licenses and ABC will require that the City make a finding of public convenience and necessity (Attachment 9).

Table 1: Existing On-Sale Licenses in Census Tract 100.09 Status
Business Name
Business Address
Type of License
Active
Walmart
11896 Amargosa Road
(Victorville)
21-Beer, Wine, and Liquor
Active
Sky Market
12720 Main Street
21-Beer, Wine, and Liquor
Active
G & M Oil Co.
12080 Amargosa Road
(Victorville)
20-Beer and Wine
Active
7 Eleven
12750 Main Street.
20-Beer and Wine
In determining whether to approve an additional license in an overconcentrated census tract, the City Council may consider the surrounding context and availability of alcohol sales within the immediate service area. While four licenses are reported within the census tract, the Walmart and G & M Oil locations are outside the City limits and located more than four miles from the proposed project site. The remaining establishments, Sky Market and 7-Eleven, are located approximately one mile away along the I-15 freeway corridor and primarily serve motorists traveling along that corridor.

The proposed project is located along Highway 395 and would serve a different travel corridor. As such, the project would provide sales to residents and motorists traveling along Highway 395 and would not substantially increase the concentration of alcohol sales within the immediate vicinity of the project site. Therefore, the City Council may determine that approval of the proposed off-sale beer and wine license would serve the public convenience and necessity.

Building Design: The convenience store and carwash building design comply with the architectural guidelines of the Development Code. The buildings incorporate a combination of stucco and tile, in addition to a brick wainscot. The buildings incorporate changes in wall and roof planes and include tower elements to highlight the entry features. In addition, the fuel canopy will be conditioned to incorporate the brick wainscot material to the supportive beams. (Attachment 6).

Traffic/Street Improvements: According to the City’s General Plan Circulation Element Highway 395 is constructed as a 130-foot wide Special Street Section, which provides two travel lanes in each direction (plus ancillary lanes) and Phelan Road is to be constructed as a 120-foot-wide Major Arterial Street Section which currently provides 2 travel lanes in each direction. As part of developing the site, the developer is required to dedicate right-of-way and construct street improvements, including curb, gutter and sidewalk along the project frontages of Highway 395 and Phelan Road. In addition, the driveway approach onto Highway 395 will be restricted to right-in and right-out only. The eastern driveway approach on Phelan Road will also be restricted to a right-in and right-out only. In addition, the project will include rubberized curbs with flexible posts along the Phelan Road median to restrict left hand turns from the project site.

Drainage: Any additional runoff created on-site will be detained in an approved storm drain storage system and an underground drainage system is proposed to store the necessary volume. Upon completion of the on-site drainage improvements, the impact of the project upon properties downstream is not considered significant.

Water and Sewer: The project will connect to an existing 12-inch PVC water line in Phelan Road and a 12-inch PVC sewer main along Caliente Road via a lateral line which extends through an easement on the north property line of the west adjacent property.

Environmental: Approval of this development requires adoption of an Initial Study/Mitigated Negative Declaration (IS/MND) pursuant to the California Environmental Quality Act (CEQA). The IS/MND prepared for the project concluded that the project will not have any significant negative impacts on the environment upon implementation of the recommended mitigation measures. (Attachment 8) The environmental analysis included a biological resources assessment to evaluate potential impacts to sensitive habitats and special-status species. The analysis concluded that Joshua Trees are present on the site and will require an Incidental Take Permit from the California Department of Fish and Wildlife. Additionally, the biological report shows that the site does not contain habitat for the desert tortoise nor any other threatened or endangered species. However, a pre-construction surveys for the burrowing owl and nesting bird will be conducted prior to issuance of a grading permit.

The environmental analysis also concluded that the proposed project would not result in any impacts to known archaeological resources or tribal cultural resources. However, there is potential for project-related construction to impact unknown or previously unrecorded archaeological resources. For this reason, mitigation measures are proposed in the event that cultural resources are inadvertently encountered during excavation activities. If cultural resources are found during grading, then grading activities shall cease and the applicant shall contract with a City approved archaeologist or paleontologist to monitor grading prior to resuming grading. All cultural resources discovered shall be handled in accordance with state and federal law.

The environmental document was circulated to local, state and federal agencies and organizations as well as surrounding property owners for public review from January 20, 2026, through February 18, 2026 (SCH#2026010656). During the public review period, five comment letters were received (Attachment 7).

The table below identifies the origin of each comment letter and summarizes how the comments were addressed and incorporated into the Project’s Conditions of Approval and/or the updated Initial Study/Mitigated Negative Declaration (IS/MND). Additionally, response letters were provided to the California Department of Transportation (Caltrans) and the California Department of Water Resources (DWR) (Attachment 8).

Table 2: Comment Letters and Responses
Agency/Individual
Comments and Responses
Chris Anderson
Comments: A community member raised concerns with traffic safety stating the environmental study does not adequately evaluate traffic impacts on westbound traffic along Phelan Road near the proposed gas station entrance and the need for a right-turn lane onto the project site Response: A traffic study prepared by a California-licensed traffic engineer was submitted to the City during the entitlement review process and was accepted prior to scheduling the project for public hearing. The project is conditioned to submit a final traffic study to the City and Caltrans prior to ground disturbance. Additionally, the project applicant will be required to obtain all necessary Caltrans permits before commencing any ground-disturbing activities.

Mojave Desert
Air Quality Management District (MDAQMD)
Comments: MDAQMD requested the project’s compliance with air quality regulations and implementation of dust control best management practices as well as district permits be obtained.

Response: The IS/MND confirms that construction and operation will comply with MDAQMD rules and regulations. The project is also conditioned to provide evidence of acceptance by MDAQMD prior to ground-disturbing activities, ensuring CEQA consistency with air quality requirements.

California Department of Fish and Wildlife (CDFW)
Comments: CDFW offered comments and recommendations to assist in adequately identifying and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on fish and wildlife (biological) resources. Specifically, these recommendations focused on Burrowing Owl and Nesting Birds.

Response: The IS/MND and Mitigation Monitoring and Reporting Program were updated to incorporate CDFW’s recommendations. Biological mitigation measures now include MM BIO-2 (Pre-Construction Surveys), MM BIO-3 (Burrow Avoidance), and MM BIO-4 (Nesting Bird Survey), ensuring project compliance with CEQA biological resource requirements.

California Department of Transportation (DOT)
Comments: Caltrans requests additional traffic analyses, including truck turning templates, queuing studies, corrected trip distribution, and a stand-alone safety review with potential mitigation. The project must maintain ADA-compliant pedestrian and bicycle access during construction. Any work encroaching on Caltrans right-of-way requires an encroachment permit.

Response: A traffic study prepared by a California-licensed traffic engineer was submitted to the City during the entitlement review process and accepted prior to scheduling the project for public hearing. The project is conditioned to submit a final traffic study to the City and Caltrans prior to any ground-disturbing activities. Caltrans’ requests have been addressed through a response letter and updates to the Conditions of Approval and IS/MND. The applicant has been issued an encroachment permit for the proposed driveway onto Highway 395 and will obtain all additional necessary Caltrans permits before commencing construction, ensuring CEQA compliance with transportation and safety requirements. A response letter documenting these actions was also provided to Caltrans California Department of Water Resources (DWR)
Comments: DWR raised concerns that the project’s maps are outdated and lack sufficient detail to show existing development and local drainage features. The IS/MND does not provide adequate analysis of off-site stormwater flows, potential erosion, or impacts to the Oro Grande Wash and DWR rights-of-way. DWR requests a Hydrology/Drainage Study to evaluate pre- and post-development runoff and ensure the proposed underground retention facility can manage flows without affecting DWR facilities. Updated drainage plans and analyses are needed to prevent ponding, sedimentation, and scour.

Response: DWR’s concerns were addressed in a response letter as well as the updated conditions of approval and IS/MND. The IS/MND was updated to include additional detail on existing site conditions, drainage patterns, and the proposed storm drain system, as well as pre- and post-construction stormwater peak flow rates. The Project-specific Hydrology Report will be reviewed and approved by the City and provided to DWR as per the conditions of approval. All required DWR permits will be obtained prior to any ground-disturbing activities, ensuring CEQA compliance with hydrology and drainage requirements.

Conclusion: The project conforms to the policies of the City’s General Plan and meets the standards of the Development Code and the Main Street Freeway Corridor Specific Plan. Further, approval of the sale of beer and wine is appropriate, particularly to allow the convenience store to be competitive with similar busisnesses and to meet customer demand.

CITY GOAL SUPPORTED BY THIS ITEM
Future Development - Facilitate balanced growth to ensure cohesive community development and pursue economic development.

FISCAL IMPACT
The development would generate tax revenue and is subject to applicable development impact, business license and permit fees.

ALTERNATIVE(S)
Provide alternative direction to staff.

ATTACHMENT(S)
Resolution No. 2026-07: Approving Conditional Use Permit CUP24-00012 with denial of carwash component Site Plan
Floor plan
Aerial Photo
General Plan Map
Census Tract Map 100.09
Colored Elevations (3)
Comment Letters (5)
Updated IS/MND and (2) Response Letters
Draft Conditions of Approval
March 26, 2026 Planning Commission Staff Report with Resolution No. PC-2026-01 City of Hesperia STAFF REPORT City of Hesperia STAFF REPORT City of Hesperia

STAFF REPORT
City of Hesperia

STAFF REPORT

Page 3 of 3 ends

Staff Report to the Mayor and Council Members
CUP24-00012
May 5, 2026