Project Details
Title Description Location Component
Priority
Status
Est. Schedule Useful
Life
Assem SenateStart Complete Min Max
FY 2025-26
Street
Improvement
Project
This project will include: Pavement Rehab/Repair
(Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Consisting of the select removal and
replacement of asphalt on Seventh Avenue between
Willow Street and Bear Valley Road
Seventh Avenue between
Willow Street and Bear Valley
Avenue
Construction In Progress
25/26
04/2026 07/2026
10 20 59 17
Maple Avenue
Rehabilitation
This project will include: ADA Curb Ramp Installation
(New), ADA Curb Ramp Rehab/Repair (Existing),
Pavement Rehab/Repair (Existing), Paving and/or
Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or
Culvert Rehab/Repair (Existing)
Maple Avenue between Main
Street and Ranchero Road
Construction In Progress
25/26
05/2026 12/2026
15 20 33 17
FY 2021-22
Street
Improvement
Project
This project will include: Pavement Rehab/Repair
(Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2021-22 Street Improvement Project which
includes Jacaranda Avenue which includes select level
course and crack and cape seal between Bear Valley
Road and Eucalyptus Street, Seventh Avenue which
includes selected removal and replacement and slurry
seal and crack seal and/or grind and overlay of asphalt on between Main Street and Mesquite Street Seventh
Avenue. | N/A
Seventh Avenue between
Willow Street and Cajon Street;
Seventh Avenue between Main
St and Mesquite Street; and
Jacaranda Avenue between
Bear Valley Road and
Eucalyptus Street.

Construction In Progress
25/26
04/2026 07/2026
5 20 59 17
FY 2026-27
Street
Improvements
This project will include: ADA Curb Ramp Rehab/Repair
(Existing), Bicycle Lane Rehab/Repair (Existing), Cost
Estimating, Document Preparation, Environmental
Study/Documents, Pavement Rehab/Repair (Existing),
Paving and/or Striping Rehab/Repair (Existing Safety),
Preliminary Design, Sidewalk and/or Crosswalk
Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)
Seventh Ave from
Mesquite Street to
Ranchero Road
Pre-
Construction
and
Construction
New 26/27
05/2026
02/2027
02/2027
12/2027
5 20 59 17
FY 2026-27
Slurry Seal
Project
This project will include: Cost Estimating, Document
Preparation, Environmental Study/Documents, Pavement
Rehab/Repair (Existing), Paving and/or Striping
Rehab/Repair (Existing Safety), Preliminary Design |
Additional locations-MOJAVE ST (COTTONWOOD-

LOCUST), PENDLETON ST (HAWTHORNE-KERN),

PENDLETON ST (COTTONWOOD-HAWTHORNE),

PENDLETON ST (REDWOOD-COTTONWOOD),

PENDLETON ST (VICTOR-OAKWOOD), PENDLETON ST
(MAPLE-HEMLOCK), PENDLETON ST (BALSAM-

REDLANDS), PORTLAND AVE (RIVERSIDE-CASHEW),

PORTLAND AVE (PENDLETON-MAUNA LOA), SMOKE TREE

ST (BALSAM-HICKORY), SPRUCE ST (HAWTHORNE-

LOCUST), VICTOR AVE (RIVERSIDE-CASHEW), WILLOW

ST (OAKWOOD-COTTONWOOD), WILLOW ST (SHANGRI-

LA-MAPLE), WILLOW ST(COTTONWOOD-LOCUST)

ARROYO AVE (RIVERSIDE-

CASHEW), ARROYO AVE
(PENDLETON-MAUNA LOA),

BALSAM AVE (MOJAVE-

RIVERSIDE), BALSAM AVE
(MESA-PENDLETON), CASHEW

ST (HAWTHORNE-KERN),

CASHEW ST (HEMLOCK-

VICTOR), COTTONWOOD AVE
(CASHEW-WILLOW), HEMLOCK

AVE (RIVERSIDE-CASHEW),

HEMLOCK AVE (PENDLETON-

MAUNA LOA), JUNIPER ST
(REDWOOD-COTTONWOOD),

JUNIPER ST (VICTOR-

OAKWOOD), JUNIPER ST
(HEMLOCK-VICTOR), KERN AVE
(RIVERSIDE-CASHEW), LOCUST

AVE (PENDLETON-MAUNA LOA),

MAUNA LOA ST (KERN-

LOCUST), MAUNA LOA ST
(REGENCY-MAPLE)
Pre-
Construction
and
Construction
New 26/27
05/2026
02/2026
02/2027
12/2027
5 5 59 17
Attachment A
Attachment 2
Title Description Location Component
Priority
Status
Est. Schedule Useful
Life
Assem SenateStart Complete Min Max
Escondido
Avenue Street
Improvements
This project will include: ADA Curb Ramp Rehab/Repair
(Existing), Cost Estimating, Document Preparation,
Environmental Study/Documents, Pavement
Rehab/Repair (Existing), Paving and/or Striping
Rehab/Repair (Existing Safety), Preliminary Design,
Project Scope Development, Sidewalk and/or Crosswalk
Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)
Escondido Ave from Sage St to
Main St.

Pre-
Construction
and
Construction
New 26/27
07/2026
01/2027
12/2026
12/2027
5 20 59 17