Cities Index.
Agenda, first session

Highland City Council
January 9, 2024

Document
Agenda, first session
Meeting
January 9, 2024
Body
Highland City Council
Original file
652 KB
Text extracted from the city's file for reading and search. Open the original on highlandca.api.civicclerk.com. That file is the official record.

City of Highland
Engineering Department
Conditions of Approval
SPR 20- 001 & DRA 20- 006) Greenspot Apartments
B Required Prior to Building Permit/ Construction
C Required Prior to Building Occupancy
D Ongoing
E Required Prior to Grading Permit
Non Standard Conditions
GRADING PC Approved 9/ 1/ 2020
CC Amended 9/ 23/ 2020
CC Amended 1/ 9/ 2024
E 1. Design grading and landscaping plans to comply with the City's clear sight triangle criteria at public street intersections and at private driveways. Walls, fencing, monument signs, slope, and landscaping, within the clear sight triangle, must not exceed thirty inches in height measured from the flowline of the street, unless a sight distance analysis that demonstratessightdistanceis adequatelymaintainedissubmittedto andapprovedbythe City Engineer.

B 2. Submit a preliminary soils report, prepared by a licensed Geotechnical Engineer, for review and approval by the City Engineer. Comply with the recommendations contained in the report and any amendments thereof as approved by the City Engineer.

E 3. Submit rough and/or precise grading plans to the City Engineer for review and approval.

Complywiththe Cityof Highlandgradingstandardsas shownonthe gradingplanchecklist.

B 4. Submitthe structuraldesignandlocationfor any requiredretainingwallsfor reviewand approval by the City Engineer.

E 5. Submit an erosion control plan to minimize potential increases in erosion and sediment transport during construction activity for City Engineer approval. Place erosion control measures during or after grading work as required by the City Engineer.

D 6. Implementdustcontrolmeasuresduringconstructionactivitiesincluding, butnotlimitedto, daily watering of construction area as frequently as necessary during active and inactive periods, utilizing soil emulsions, limiting construction vehicle speed to 10 miles per hour, stabilizing construction entrances to prevent trackout of sediments, and street sweeping.

B 7. Submit original wet signed and stamped rough grading certifications from the soils engineer and the grading engineer, along with compaction reports, to the City Engineer.

C 8. Submitoriginalwet signedandstampedfinal gradingcertificationfromthe grading engineer, to the City Engineer.

SPR 20- 001& DRA 20- 006 1

← All documents from this meeting