Cities Index.
Item No. 9 - Distributed Agenda Material (PDF)

Highland City Council
November 12, 2025

Document
Item No. 9 - Distributed Agenda Material (PDF)
Meeting
November 12, 2025
Body
Highland City Council
Original file
1.3 MB
Text extracted from the city's file for reading and search. Open the original on highlandca.api.civicclerk.com. That file is the official record.

Distributed: Monday, November 10, 2025

DISTRIBUTED AGENDA MATERIAL
for Agenda Item No. 9
CI

TY COUNCIL REGULAR MEETING
MEETING DATE: November 12, 2025
ITEM NUMBER: 9
ITEM DESCRIPTION: Grant Funding Agreement between the City of Highland and San Bernardino County Transportation Authority (SBCTA) for the Base Line/Greenspot Road Smart Corridor Project
SUBMITTED BY: Octavio Duran Jr., Public Works Director/City Engineer A
ttachment A – Smart Corridor Funding Agreement.

March 17, 2025
Mr. Ryan Graham
Program Manager
San Bernardino County Transportation Authority (SBCTA)
1170 W. 3rd St., 2nd Floor
San Bernardino, CA 92410
RE: Base Line and Greenspot Road Connected Smart Corridors Grant Application The City of Highland is pleased to respond to SBCTA’s Request for Information for the Development of Smart Arterial Corridors in the San Bernardino Valley. The City has identified several connected corridors within the City of Highland that are prime candi dates for becoming “Smart Arterial Corridors”. These corridors which include Caltrans intersections at Base Line/SR-210 and 5th St/SR-210 are as follows:
• Base Line – Sterling Avenue to Church Street
• 5th Street/Greenspot Road – Del Rosa Drive to Weaver Street • Boulder Avenue – San Manuel Village to Greenspot Road • Victoria Avenue – Pacific Street to 5th Street
• Palm Avenue – Base Line to 3rd Street
• 9th Street – Del Rosa Avenue to Victoria Avenue
It is important to note that
Base Line, Boulder Avenue,
Greenspot Road, and
Victoria Avenue are all
Omnitrans Priority Transit
Corridors. Additionally, all
the corridors listed are part
of the San Bernardino
Valley Coordinated Traffic
Signal System (SBVCTSS).

The Victoria Avenue
corridor is also a key
corridor that leads to San
Bernardino International
Airport. The project
corridors are shown in the
figure to the right.

Base Line and Greenspot Road Connected Smart Corridors
Page
Lead Jurisdiction
The City of Highland intends to lead this project with collaboration from Caltrans. Below is the contact information for the City of Highland.

Octavio Duran Jr., P.E.

Public Works Director/City Engineer
(909) 864-6861 x221
City of Highland
27215 Base Line
Highland, CA 92346
[email protected]
Project Summary
The City of Highland currently maintains a total of 40 signalized intersections with 4 additional signalized intersections maintained by Caltrans. The City currently manages the traffic signals via the McCain QuicNet Pro Traffic Management System located at City Hall. The traffic signals communica te to the central system via fiber optic, Ethernet over copper, wireless, and cell modem communications. This project proposes to encompass the Base Line, 5th Street/Greenspot Road, Palm Avenue, 9th Street, Boulder Avenue, and Victoria Avenue corridors whi ch cover 38 City of Highland maintained signalized intersections, and 4 Caltrans maintained signalized intersections. The City maintained traffic signals utilize a mix of Model 170 and 2070 controller units with McCain 233 and 2033 software which have been in use for over 10 years. As part of this project, it is the City’s goal to upgrade aging traffic signal communication equipment including controller units and the traffic management system to position the City for future Transit Signal Priority projects.

Proposed Improvements
The proposed improvements identified for this project are illustrated in the attached figure .

Improvements include the following:
- Traffic Signal Controller Unit upgrades to TSP-Ready Controllers - Traffic Signal Communications
o Fiber Optic Cable in Existing Conduit/New Conduit
o Wireless Ethernet Radios
o Video/Radar Detection Systems
o Fiber Ethernet Switches
- Upgrade central system to Swarco MyCity Traffic Management System - Traffic Signal Coordination Timing with Traffic Responsive System for Project Corridors Base Line and Greenspot Road Connected Smart Corridors
Page
Benefits of Project
The proposed improvements identified in this project will greatly benefit the City of Highland, its residents, and adjoining agencies. The project will provide the City with the resources to replace out -of- date equipment with a new state of the art traffic signal system. This new equipment will allow for the implementation of smart corridors and the implementation of new traffic signal coordination timing with a Traffic Responsive System. Traffic signal coordination has shown to provide 10% -15% improvement in travel time reduction providing important air quality benefits.

Financial Plan
A preliminary cost estimate for the proposed improvements has been prepared and is presented in the attached table. It is estimated that the total project cost, which includes engineering design, construction, construction management, and signal timing preparation will be $1,399, 484 which includes an agency match of $339,484 (39.95%).

Project Schedule
The City intends to fast track the implementation of this project if awarded. The proposed project schedule is summarized below.

SBCTA Board Approval May 7, 2025
SBCTA/City Funding Agreement June/July 2025
Consultant Selection August/September 2025
PS&E Preparation October 2025 – March 2026
Construction April 2026 – September 2026
Signal Timing Implementation December 2026
Project Acceptance and Final Report June 2027
Corridor Transportation Data
As mentioned previously Base Line, Boulder Avenue, Greenspot Road, and Victoria Avenue are all Omnitrans Priority Transit Corridors. The different routes along the project corridors are as follows:
- Omnitrans Route 3 and Route 4
o Boulder Avenue from Highland Avenue to Base Line
o Base Line from Del Rosa Drive to Boulder Avenue
- Omnitrans Route 15
o Base Line from Palm Avenue to Church Street
o 5th Street from Central Avenue to Palm Avenue
Base Line and Greenspot Road Connected Smart Corridors
Page
Relative to emergency services, Highland Fire Department Station 541 is located along the Base Line corridor just east of Central Avenue. Average daily traffic for the project corridors is summarized on the Table below.

Base Line and Greenspot Rd Connected Smart Corridors
ADT Volumes
Street Segment AADT
Base Line
Sterling Avenue to SR-210 Fwy 24,779
SR-210 Fwy to Church Street 21,819
5th Street Del Rosa Drive to SR-210 Fwy 21,208
Greenspot Road SR-210 Fwy to Weaver Street 24,452
Palm Avenue Base Line to 3rd Street 11,860
Boulder Avenue
Highland Avenue to Base Line 13,244
Base Line to Greenspot Road 9,185
Victoria Avenue
Pacific Street to Base Line 12,859
Base Line to 5th Street 7,885
Maintenance of System
The City of Highland currently allocates adequate resources to maintain its traffic signal system. With the implementation of “Smart Corridor” improvements, the City intends to allocate additional resources to maintain the “Smart Corridors” to benefit its residents and the motorists who travel those corridors.

The City of Highland looks forward to partnering with SBCTA for the implementation of this important project. If there are any questions on our proposed project or if you want to discuss it further, please feel free to contact me.

Respectfully submitted,
Octavio Duran Jr., P.E.

Public Works Director/City Engineer
City of Highland
(909) 864-6861 x221
[email protected]

HIGHLAND

REDLANDSCITY OFSAN BERNARDINO

CITY OFSAN BERNARDINO
Base Line and Greenspot Rd Connected Smart Corridors
EXISTING CITY TRAFFIC SIGNALCALTRANS TRAFFIC SIGNALEXISTING SHARED TRAFFIC SIGNALSBVCTSS CORRIDOROMNITRANS PRIORITY TRANSIT CORRIDORPROPOSED "TSP-READY" CONTROLLER UNITPROPOSED CELL PHONE MODEMPROPOSED WIRELESS ETHERNET RADIOPROPOSED VIDEO/RADAR DETECTION SYSTEMFIBER CABLE IN EXISTING CONDUITEXISTING FIBER COMMUNICATIONSPROPOSED FIBER ETHERNET SWITCH LEGEND:

Development of Smart Arterial Corridors in the San Bernardino Valley City of Highland
Base Line and Greenspot Rd Connected Smart Corridors

DESCRIPTION OF WORK BY INTERSECTION

AGENCY MATCH
2070LX Controller Unit with
Omni eX
Video/Radar Detection
System
Cell Phone Modem
Rotate Existing Ethernet
Radio
Fiber in Existing Conduit
#6E Pullbox + Splice Closure
Fiber Optic Drop Cable
Ethernet Switch
MyCity Traffic Management
System
TMC Workstation
Wireless Ethernet Radio
$10,000.00 $40,000.00 $3,500.00 $2,500.00 $10.00 $4,500.00 $500.00 $4, 000.00 $107,000.00 $5,000.00 $8,000.00 123456789 1 0 1 1 12% 10% 10% $4,500/Int 28.55%
1 Highland Base Line at Sterling Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 2 Highland Base Line at McKinley St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 3 Highland Base Line at Victoria Ave 11 11 6,540.00$ 54,500.00 $ 5,450.00 $ 6,649.00 $ 4,500.00 $ 77,639.00$ $ 22,162.12 4 Highland Base Line at Cunningham St/Olive St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 5 Highland Base Line at Central Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 6 Highland Base Line at Palm Ave 1 1 1700 1 1 1 1 10,080.00$ 84,000.00 $ 8,400.00 $ 10,248.00 $ 4,500.00 $ 117,228.00$ $ 33,462.84 7 Highland Base Line at Church Ave 1 1100 1 1 1 3,600.00$ 30,000.00 $ 3,000.00 $ 3,660.00 $ 4,500.00 $ 44,760.00$ $ 12,776.78 8 Caltrans Base Line at SR-210 WB Ramps 625 750.00$ 6,250.00$ 625.00 $ 762.50 $ 4,500.00$ 12,887.50$ $ 3,678.75 9 Caltrans Base Line at SR-210 EB Ramps 375 450.00$ 3,750.00$ 375.00 $ 457.50 $ 4,500.00$ 9,532.50$ $ 2,721.06 10 Highland Base Line at Seine Ave 1 1350 1 1 1 3,900.00$ 32,500.00 $ 3,250.00 $ 3,965.00 $ 4,500.00 $ 48,115.00$ $ 13,734.47 11 Highland Base Line at Boulder Ave 11 5 0 0 111 7,680.00$ 64,000.00 $ 6,400.00 $ 7,808.00 $ 4,500.00 $ 90,388.00$ $ 25,801.34 12 Highland Base Line at Walgreens 1 111 2,280.00$ 19,000.00 $ 1,900.00 $ 2,318.00 $ 4,500.00 $ 29,998.00$ $ 8,562.96 13 Highland Base Line at Webster St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 14 Highland Base Line at Streater Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 15 Highland Base Line at Church St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 16 Highland Boulder Ave at San Manuel Village 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 17 Highland Boulder Ave at Beaver Medical Center 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 18 Highland Boulder Ave at Highland Village Plaza 1 850 1 1 1 3,300.00$ 27,500.00 $ 2,750.00 $ 3,355.00 $ 4,500.00 $ 41,405.00$ $ 11,819.10 19 Highland Boulder Ave at Webster St 1 1200 1 1 1 3,720.00$ 31,000.00 $ 3,100.00 $ 3,782.00 $ 4,500.00 $ 46,102.00$ $ 13,159.86 20 Highland Boulder Ave at Greenspot Rd 1 1 1,680.00$ 14,000.00 $ 1,400.00 $ 1,708.00 $ 4,500.00 $ 23,288.00$ $ 6,647.58 21 Highland 5th St at Del Rosa Dr 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 22 Highland 5th St at Victoria Ave 11 6,000.00$ 50,000.00 $ 5,000.00 $ 6,100.00 $ 4,500.00 $ 71,600.00$ $ 20,438.29 23 Highland 5th St at Central Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 24 Highland 5th St at Palm Ave 1 1 2,160.00$ 18,000.00 $ 1,800.00 $ 2,196.00 $ 4,500.00 $ 28,656.00$ $ 8,179.88 25 Highland 5th St at Church Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 26 Highland Greenspot Rd at SR-210 EB Ramps -$ - $ - $ - $ 4,500.00$ 4,500.00$ $ 1,284.53 27 Highland Greenspot Rd at SR-210 WB Ramps -$ - $ - $ - $ 4,500.00$ 4,500.00$ $ 1,284.53 28 Highland Greenspot Rd at Lowes Ctr 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 29 Highland Greenspot Rd at Costco 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 30 Highland Greenspot Rd at Orange St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 31 Highland Greenspot Rd at Church St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 32 Highland Greenspot Rd at Village at E. Highlands 11 1,620.00$ 13,500.00 $ 1,350.00 $ 1,647.00 $ 4,500.00 $ 22,617.00$ $ 6,456.04 33 Highland Greenspot Rd at Weaver St 11 1,620.00$ 13,500.00 $ 1,350.00 $ 1,647.00 $ 4,500.00 $ 22,617.00$ $ 6,456.04 34 Highland 9th St at Del Rosa Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 35 Highland 9th St at Sterling Ave 11 1,500.00$ 12,500.00 $ 1,250.00 $ 1,525.00 $ 4,500.00 $ 21,275.00$ $ 6,072.97 36 Highland 9th St at Lankershim Ave 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 37 Highland Palm Ave at Cypress St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 38 Highland Palm Ave at 3rd St 1 1,200.00$ 10,000.00 $ 1,000.00 $ 1,220.00 $ 4,500.00 $ 17,920.00$ $ 5,115.28 39 Highland Victoria Ave at Pacific St 1 1600 1 1 3,660.00$ 30,500.00 $ 3,050.00 $ 3,721.00 $ 4,500.00 $ 45,431.00$ $ 12,968.32 40 Highland Victoria Ave at 14th St 1 4200 1 1 6,780.00$ 56,500.00 $ 5,650.00 $ 6,893.00 $ 4,500.00 $ 80,323.00$ $ 22,928.27 41 Highland Victoria Ave at 9th St 1 11 1,740.00$ 14,500.00 $ 1,450.00 $ 1,769.00 $ 4,500.00 $ 23,959.00$ $ 6,839.12 42 Highland Victoria Ave at 3rd St 1 11 1,740.00$ 14,500.00 $ 1,450.00 $ 1,769.00 $ 4,500.00 $ 23,959.00$ $ 6,839.12 43 Highland City Hall TMC 11 13,440.00$ 112,000.00 $ 11,200.00 $ 13,664.00 $ 150,304.00$ $ 42,904.42 38 4 2 1 13500 7 12 13 1 1 2 1,399,484.00$ 399,484.00$ 1,000,000.00$
399,484.00$

39.95%
Agency Match Allocation =
Grant Match =
SIGNAL IMPROVEMENT TOTAL =

SIGNAL IMPROVEMENT COSTS
Construction
Management &
Inspection Contingency Signal TimingDesign TOTAL Total Agency Match

LOCATION

IMPLEMENTING AGENCYPROJECT INTERSECTION
QUANTITY TOTAL =
Grant Allocation =
Construction

DESCRIPTION OF WORK

← All documents from this meeting