Cities Index.
Agenda packet

Hughson City Council
July 14, 2026

Document
Agenda packet
Meeting
July 14, 2026
Body
Hughson City Council
Pages
576
Original file
31.5 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofhughsonca.gov. That file is the official record.

Determination: NC-23-63-1-2026-1

Page 6 of 10 ends

Unlicensed Construction Work Boat Operator, On Site
Welder
Woods-Mixer (and other similar Pugmill equipment)
GROUP 5
Cast-In Place Pipe Laying Machine
Combination Slusher and Motor Operator
Concrete Conveyor or Concrete Pump, Truck or
Equipment Mounted
Concrete Conveyor, Building Site
Concrete Pump or Pumpcrete Guns
Drilling Equipment, Watson 2000, Texoma 700 or
similar
Drilling and Boring Machinery, Horizontal (not to apply to waterliners, wagon drills or jackhammers)
Concrete Mixers/all
Man and/or Material Hoist
Mechanical Finishers (concrete) (Clary, Johnson,
Bidwell Bridge Deck or similar types)
Mechanical Burm, Curb and/or Curb and Gutter
Machine, Concrete or Asphalt
Mine or Shaft Hoist
Portable Crushers
Power Jumbo Operator (setting slip-forms, etc., in
tunnels)
Screedman (automatic or manual)
Self Propelled Compactor with Dozer
Tractor with boom, D6 or smaller
Trenching Machine, maximum digging capacity over 5
ft. depth
Vermeer T-600B Rock Cutter or similar
GROUP 6
Armor-Coater (or similar)
Ballast Jack Tamper
Boom-Type Backfilling Machine
Asst. Plant Engineer
Bridge and/or Gantry Crane
Chemical Grouting Machine, truck mounted
Chip Spreading Machine Operator
Concrete Barrier Moving Machine
Concrete Saws (self-propelled unit on streets,
highways, airports, and canals)
Deck Engineer
Drill Doctor
Drill Equipment, over 25,000 lbs up to and including
50,000 lbs
Drilling Equipment Texoma 600, Hughes 200 series
or similar up to and including 30 ft. m.r.c.

Helicopter Radioman
Hydro-Hammer or similar
Line Master
Skidsteer Loader, Bobcat larger than 743 series or
similar (with attachments)
Locomotive
Rotating Extendable Forklift, Lull Hi-Lift or similar
Assistant to Engineer, Truck Mounted Equipment
Pavement Breaker, Truck Mounted, with compressor
combination
Paving Fabric Installation and/or Laying Machine
Pipe Bending Machine (pipelines only)
Pipe Wrapping Machine (Tractor propelled and
supported)
Screedman, (except asphaltic concrete paving)
Self-Loading Chipper
Self Propelled Pipeline Wrapping Machine
Tractor
GROUP 7
Ballast Regulator
Cary Lift or similar
Combination Slurry Mixer and/or Cleaner
Coolant/Slurry Tanker Operator (hooked to
Grooving/Grinding Machine)
Drilling Equipment, 20 ft and under m.r.c.

Drill Equipment, over 1,000 lbs up to and including
25,000 lbs
Fireman Hot Plant
Grouting Machine Operator
Highline Cableway Signalman
Stationary Belt Loader (Kolman or similar)
Lift Slab Machine (Vagtborg and similar types)
Maginnes Internal Full Slab Vibrator
Material Hoist (1 Drum)
Mechanical Trench Shield
Partsman (heavy duty repair shop parts room)
Pavement Breaker with or without Compressor
Combination
Pipe Cleaning Machine (tractor propelled and
supported)
Post Driver
Roller (except Asphalt), Chip Seal
Self Propelled Automatically Applied Concrete Curing
Machine (on streets, highways, airports and canals)
Self Propelled Compactor (without dozer)
Signalman
Slip-Form Pumps (lifting device for concrete forms)
Super Sucker Vacuum Truck
Tie Spacer
Trenching Machine (maximum digging capacity up to
and including 5 ft depth)
Truck Type Loader
GROUP 8
Bit Sharpener
Boiler Tender
Box Operator
Brakeman

Page 435 of 576 ends

Determination: NC-23-63-1-2026-1

Page 7 of 10 ends

Combination Mixer and Compressor
(shotcrete/gunite)
Compressor Operator
Deckhand
Fireman
Generators
Gunite/Shotcrete Equipment Operator
Heavy Duty Repairman Helper
Hydraulic Monitor
Ken Seal Machine (or similar)
Mast Type Forklift
Mixermobile
Assistant to Engineer
Pump Operator
Refrigerator Plant
Reservoir-Debris Tug (Self-Propelled Floating)
Ross Carrier (Construction site)
Rotomist Operator
Self Propelled Tape Machine
Shuttlecar
Self Propelled Power Sweeper Operator (Includes
Vacuum Sweeper)
Slusher Operator
Surface Heater
Switchman
Tar Pot Fireman
Tugger Hoist, Single Drum
Vacuum Cooling Plant
Welding Machine (powered other than by electricity)
GROUP 8-A
Articulated Dump Truck Operator
Elevator Operator
Mini Excavator under 25 H.P. (Backhoe-Trencher)
Skidsteer Loader, Bobcat 743 series or Smaller and
similar (without attachments)
ALL CRANES AND ATTACHMENTS:

GROUP 1
Cranes over 250 tons
Derrick over 250 tons
Self Propelled Boom Type Lifting Device over 250
tons
GROUP 1-A
Clamshells and Draglines over 7 cu yds
Cranes over 100 tons
Derrick, over 100 tons
Derrick Barge Pedestal mounted over 100 tons
Self Propelled Boom Type Lifting Device Over 100
tons
Tower Cranes
GROUP 2-A
Clamshells and Draglines over 1 cu yds up to and
including 7 cu yds
Cranes over 45 tons up to and including 100 tons
Derrick Barge 100 tons and under
Rotating Tele Handler, Magni and similar, over 45
tons
Mobile Self-Erecting Tower Crane (Potain) over 3
stories
Self Propelled Boom Type Lifting Device over 45 tons
GROUP 3-A
Clamshells and Draglines up to and including 1 cu yd
Cranes 45 tons and under
Rotating Tele Handler, Magni and similar, 45 tons and
under
Mobile Self-Erecting Tower Crane (Potain), 3 stories
and under
Self Propelled Boom Type Lifting Device 45 tons and
under
GROUP 4-A
Boom Truck or dual-purpose A-Frame Truck, NonRotating over 15 tons.

Truck Mounted Rotating Telescopic Boom Type
Lifting Device, Manitex or similar (Boom Truck -over
15 tons)
Truck-Mounted Rotating Telescopic Boom Type
Lifting Device, Manitex or Similar (Boom Truck),
under 15 tons
DESCRIPTIONS FOR AREAS 1 AND 2:

Area 1 is all of Northern California within the following Township, State and/or county Boundaries:

Commencing in the Pacific Ocean on the extension of the Southerly line of Township 19S, of the Mount Diablo Base and Meridian,
Thence Easterly along the Southerly line of Township 19S, to the Northwest corner of Township 20S, Range 6E,
Thence Southerly to the Southwest corner of Township 20S, Range 6E, Thence Easterly to the Northwest corner of Township 21S, Range 7E Thence Southerly to the Southwest corner of Township 21S, Range 7E Thence Easterly to the Northwest corner of Township 22S, Range 9E,

Page 436 of 576 ends

Determination: NC-23-63-1-2026-1

Page 8 of 10 ends

Thence Southerly to the Southwest corner of Township 22S, Range 9E, Thence Easterly to the Northwest corner of Township 23S, Range 10E, Thence Southerly to the Southwest corner of Township 24S, Range 10E, Thence Easterly to the Southwest corner of Township 24S, Range 31E, Thence Northerly to the Northeast corner of Township 20S, Range 31E, Thence Westerly to the Southeast corner of Township 19S, Range 29E, Thence Northerly to the Northeast corner of Township 17S, Range 29E, Thence Westerly to the Southeast corner of Township 16S, Range 28E, Thence Northerly to the Northeast corner of Township 13S, Range 28E, Thence Westerly to the Southeast corner of Township 12S, Range 27E, Thence Northerly to the Northeast corner of Township 12S, Range 27E, Thence Westerly to the Southeast corner of Township 11S, Range 26E, Thence Northerly to the Northeast corner of Township 11S, Range 26E, Thence Westerly to the Southeast corner of Township 10S, Range 25E, Thence Northerly to the Northeast corner of Township 9S, Range 25E, Thence Westerly to the Southeast corner of Township 8S, Range 24E, Thence Northerly to the Northeast corner of Township 8S, Range 24E, Thence Westerly to the Southeast corner of Township 7S, Range 23E, Thence Northerly to the Northeast corner of Township 6S, Range 23E, Thence Westerly to the Southeast corner of Township 5S, Range 20E, Thence Northerly to the Northeast corner of Township 5S, Range 20E, Thence Westerly to the Southeast corner of Township 4S, Range 19E, Thence Northerly to the Northeast corner of Township 1S, Range 19E, Thence Westerly to the Southeast corner of Township 1N, Range 18E, Thence Northerly to the Northeast corner of Township 3N, Range 18E, Thence Westerly to the Southeast corner of Township 4N, Range 17E, Thence Northerly to the Northeast corner of Township 4N, Range 17E, Thence Westerly to the Southeast corner of Township 5N, Range 15E, Thence Northerly to the Northeast corner of Township 5N, Range 15E, Thence Westerly to the Southeast corner of Township 6N, Range 14E, Thence Northerly to the Northeast corner of Township 10N, Range 14E, Thence Easterly along the Southern line of Township 11N, to the California/Nevada State Border, Thence Northerly along the California/Nevada State Border to the Northerly line of Township 17N, Thence Westerly to the Southeast corner of Township 18N, Range 10E, Thence Northerly to the Northeast corner of Township 20N, Range 10E, Thence Westerly to the Southeast corner of Township 21N, Range 9E, Thence Northerly to the Northeast corner of Township 21N, Range 9E, Thence Westerly to the Southeast corner of Township 22N, Range 8E, Thence Northerly to the Northeast corner of Township 22N, Range 8E, Thence Westerly to the Northwest corner of Township 22N, Range 8E, Thence Northerly to the Southwest corner of Township 27N, Range 8E, Thence Easterly to the Southeast corner of Township 27N, Range 8E, Thence Northerly to the Northeast corner of Township 28N, Range 8E, Thence Westerly to the Southeast corner of Township 29N, Range 6E, Thence Northerly to the Northeast corner of Township 32N, Range 6E, Thence Westerly to the Northwest corner of Township 32N, Range 6E, Thence Northerly to the Northeast corner of Township 35N, Range 5E, Thence Westerly to the Southeast corner of Township 36N, Range 3E, Thence Northerly to the Northeast corner of township 36N, Range 3E, Thence Westerly to the Southeast corner of Township 37N, Range 1W, Thence Northerly to the Northeast corner of Township 38N, Range 1W, Thence Westerly to the Southeast corner of Township 39N, Range 2W,

Page 437 of 576 ends

Determination: NC-23-63-1-2026-1

Page 9 of 10 ends

Thence Northerly to the Northeast corner of Township 40N, Range 2W, Thence Westerly to the Southeast corner of Township 41N, Range 4W, Thence Northerly to the Northeast corner of Township 42N, Range 4W, Thence Westerly to the Southeast corner of Township 43N, Range 5W, Thence Northerly to the California/Oregon State Border, Thence Westerly along the California/Oregon State Border to the Westerly Boundary of Township Range 8W, Thence Southerly to the Southwest corner of Township 43N, Range 8W, Thence Easterly to the Southeast corner of Township 43N, Range 8W, Thence Southerly to the Southwest corner of Township 42N, Range 7W, Thence Easterly to the Southeast corner of Township 42N, Range 7W, Thence Southerly to the Southwest corner of Township 41N, Range 6W, Thence Easterly to the Northwest corner of Township 40N, Range 5W, Thence Southerly to the Southwest corner of Township 38N, Range 5W, Thence Westerly to the Northwest corner of Township 37N, Range 6W, Thence Southerly to the Southwest corner of Township 35N, Range 6W, Thence Westerly to the Northwest corner of Township 34N, Range 10W, Thence Southerly to the Southwest corner of Township 31N, Range 10W, Thence Easterly to the Northwest corner of Township 30N, Range 9W, Thence Southerly to the Southwest corner of Township 30N, Range 9W, Thence Easterly to the Northwest corner of Township 29N, Range 8W, Thence Southerly to the Southwest corner of Township 23N, Range 8W, Thence Easterly to the Northwest corner of Township 22N, Range 6W, Thence Southerly to the Southwest corner of Township 16N, Range 6W, Thence Westerly to the Southeast corner of Township 16N, Range 9W, Thence Northerly to the Northeast corner of Township 16N, Range 9W, Thence Westerly to the Southeast corner of Township 17N, Range 12W, Thence Northerly to the Northeast corner of Township 18N, Range 12W, Thence Westerly to the Northwest corner of Township 18N, Range 15W, Thence Southerly to the Southwest corner of Township 14N, Range 15W, Thence Easterly to the Northwest corner of Township 13N, Range 14W, Thence Southerly to the Southwest corner of Township 13N, Range 14W, Thence Easterly to the Northwest corner of Township 12N, Range 13W, Thence Southerly to the Southwest corner of Township 12N, Range 13W, Thence Easterly to the Northwest corner of Township 11N, Range 12W, Thence Southerly into the Pacific Ocean and Commencing in the Pacific Ocean on the extension of the Humboldt Base Line,
Thence Easterly to the Northwest corner of Township 1S, Range 2E, Thence Southerly to the Southwest corner of Township 2S, Range 2E, Thence Easterly to the Northwest corner of Township 3S, Range 3E, Thence Southerly to the Southwest corner of Township 5S, Range 3E, Thence Easterly to the Southeast corner of Township 5S, Range 4E, Thence Northerly to the Northeast corner of Township 4S, Range 4E, Thence Westerly to the Southeast corner of Township 3S, Range 3E, Thence Northerly to the Northeast corner of Township 5N, Range 3E, Thence Easterly to the Southeast corner of Township 6N, Range 5E, Thence Northerly to the Northeast corner of Township 7N, Range 5E, Thence Westerly to the Southeast corner of Township 8N, Range 3E, Thence Northerly to the Northeast corner of Township 9N, Range 3E, Thence Westerly to the Southeast corner of Township 10N, Range 1E, Thence Northerly to the Northeast corner of Township 13N, Range 1E, Thence Westerly into the Pacific Ocean, excluding that portion of Northern California contained within the following lines:

Page 438 of 576 ends

Determination: NC-23-63-1-2026-1

Page 10 of 10 ends

Commencing at the Southwest corner of Township 12N, Range 11E, of the Mount Diablo Base and Meridian, Thence Easterly to the Southeast corner of Township 12N, Range 16E, Thence Northerly to the Northeast corner of Township 12N, Range 16E, Thence Westerly to the Southeast corner of Township 13N, Range 15E, Thence Northerly to the Northeast corner of Township 13N, Range 15E, Thence Westerly to the Southeast corner of Township 14N, Range 14E, Thence Northerly to the Northeast corner of Township 16N, Range 14E, Thence Westerly to the Northwest corner of Township 16N, Range 12E, Thence Southerly to the Southwest corner of Township 16N, Range 12E, Thence Westerly to the Northwest corner of Township 15N, Range 11E, Thence Southerly to the point of beginning at the Southwest corner of Township 12N, Range 11E, Area 2 shall be all areas not part of Area 1 described above.

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For classifications within each group, see Pages 5 – 7. b When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. c Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather.
d Includes an amount for supplemental dues.

Page 439 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE

DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: OPERATING ENGINEER (BUILDING CONSTRUCTION) # a
Determination:

NC-23-63-1-2026-1A
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now.

Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Locality: All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

AREA 1 - Butte, Kings, Merced, Napa, Sacramento, San Benito, San Joaquin, Santa Cruz, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination) Wages and total hourly rates (including employer payments) (Area 1):

Classification
(Journeyperson)
Classification Groupb
Basic
Hourly
Rate
Hoursc
Total
Hourly
Rate
Daily/Saturday
Overtime Hourly
Rate (1½ x)d
Sunday/Holiday
Overtime Hourly
Rate (2 x)
Group 1 $65.54 8 $100.23 $133.00 $165.77
Group 2 $64.09 8 $98.78 $130.83 $162.87
Group 3 $62.69 8 $97.38 $128.73 $160.07
Group 4 $61.36 8 $96.05 $126.73 $157.41
Group 5 $60.15 8 $94.84 $124.92 $154.99
Group 6 $58.88 8 $93.57 $123.01 $152.45
Group 7 $57.79 8 $92.48 $121.38 $150.27
Group 8 $56.71 8 $91.40 $119.76 $148.11
Group 8-A $54.59 8 $89.28 $116.58 $143.87
ALL CRANES & ATTACHMENTS:

Group 1
$67.14 8 $101.83 $135.40 $168.97
Truck Crane Assistant to Engineer $60.48 8 $95.17 $125.41 $155.65 Assistant to Engineer $58.31 8 $93.00 $122.16 $151.31
Group 1-A $66.39 8 $101.08 $134.28 $167.47
Truck Crane Assistant to Engineer $59.73 8 $94.42 $124.29 $154.15 Assistant to Engineer $57.56 8 $92.25 $121.03 $149.81
Group 2-A $64.70 8 $99.39 $131.74 $164.09
Truck Crane Assistant to Engineer $59.49 8 $94.18 $123.93 $153.67 Assistant to Engineer $57.34 8 $92.03 $120.70 $149.37

Page 440 of 576 ends

Determination: NC-23-63-1-2026-1A

Page 2 of 5 ends

Classification
(Journeyperson)
Classification Groupb
Basic
Hourly
Rate
Hoursc
Total
Hourly
Rate
Daily/Saturday
Overtime Hourly
Rate (1½ x)d
Sunday/Holiday
Overtime Hourly
Rate (2 x)
Group 3-A $63.06 8 $97.75 $129.28 $160.81
Truck Crane Assistant to Engineer $59.25 8 $93.94 $123.57 $153.19 Hydraulic $58.88 8 $93.57 $123.01 $152.45
Assistant to Engineer $57.09 8 $91.78 $120.33 $148.87
Group 4-A $60.15 8 $94.84 $124.92 $154.99
AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination) Wages and total hourly rates (including employer payments) (Area 2):

Classification
(Journeyperson)
Classification Groupb
Basic
Hourly
Rate
Hoursc
Total
Hourly
Rate
Daily/Saturday
Overtime Hourly
Rate (1½ X)d
Sunday/Holiday
Overtime Hourly
Rate (2 x)
Group 1 $67.54 8 $102.23 $136.00 $169.77
Group 2 $66.09 8 $100.78 $133.83 $166.87
Group 3 $64.69 8 $99.38 $131.73 $164.07
Group 4 $63.36 8 $98.05 $129.73 $161.41
Group 5 $62.15 8 $96.84 $127.92 $158.99
Group 6 $60.88 8 $95.57 $126.01 $156.45
Group 7 $59.79 8 $94.48 $124.38 $154.27
Group 8 $58.71 8 $93.40 $122.76 $152.11
Group 8-A $56.59 8 $91.28 $119.58 $147.87
ALL CRANES & ATTACHMENTS:

Group 1 $69.14 8 $103.83 $138.40 $172.97
Truck Crane Assistant to Engineer $62.48 8 $97.17 $128.41 $159.65 Assistant to Engineer $60.31 8 $95.00 $125.16 $155.31
Group 1-A $68.39 8 $103.08 $137.28 $171.47
Truck Crane Assistant to Engineer $61.73 8 $96.42 $127.29 $158.15 Assistant to Engineer $59.56 8 $94.25 $124.03 $153.81
Group 2-A $66.70 8 $101.39 $134.74 $168.09
Truck Crane Assistant to Engineer $61.49 8 $96.18 $126.93 $157.67 Assistant to Engineer $59.34 8 $94.03 $123.70 $153.37
Group 3-A $65.06 8 $99.75 $132.28 $164.81
Truck Crane Assistant to Engineer $61.25 8 $95.94 $126.57 $157.19 Hydraulic $60.88 8 $95.57 $126.01 $156.45
Assistant to Engineer $59.09 8 $93.78 $123.33 $152.87
Group 4-A $62.15 8 $96.84 $127.92 $158.99
Employer Payments:

Type of Fund Amount per Hour
Health and Welfare $13.38
Pension $12.28
Vacation and Holidaye $6.10
Training $1.31
Other $1.62

Page 441 of 576 ends

Determination: NC-23-63-1-2026-1A

Page 3 of 5 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE

DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: OPERATING ENGINEER (BUILDING CONSTRUCTION) # a
(SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-23-63-1-2026-1A
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now.

Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Locality:

All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

AREA 1 - Butte, Kings, Merced, Napa, Sacramento, San Benito, San Joaquin, Santa Cruz, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination) Wages and total hourly rates (including employer payments) (Area 1):

Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Group b
Basic
Hourly
Rate
Hours
Total
Hourly
Rate
Daily/Saturday
Overtime Hourly
Rate (1½ X) d
Sunday/Holiday
Overtime Hourly
Rate (2X)
Group 1 $71.54 8 $106.23 $142.00 $177.77
Group 2 $70.09 8 $104.78 $139.83 $174.87
Group 3 $68.69 8 $103.38 $137.73 $172.07
Group 4 $67.36 8 $102.05 $135.73 $169.41
Group 5 $66.15 8 $100.84 $133.92 $166.99
Group 6 $64.88 8 $99.57 $132.01 $164.45
Group 7 $63.79 8 $98.48 $130.38 $162.27
Group 8 $62.71 8 $97.40 $128.76 $160.11
Group 8-A $60.59 8 $95.28 $125.58 $155.87
ALL CRANES & ATTACHMENTS:

Group 1 $73.14 8 $107.83 $144.40 $180.97
Truck Crane Assistant to Engineer $66.48 8 $101.17 $134.41 $167.65 Assistant to Engineer $64.31 8 $99.00 $131.16 $163.31

Page 442 of 576 ends

Determination: NC-23-63-1-2026-1A

Page 4 of 5 ends

Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Group b
Basic
Hourly
Rate
Hours
Total
Hourly
Rate
Daily/Saturday
Overtime Hourly
Rate (1½ X) d
Sunday/Holiday
Overtime Hourly
Rate (2X)
Group 1-A $72.39 8 $107.08 $143.28 $179.47
Truck Crane Assistant to Engineer $65.73 8 $100.42 $133.29 $166.15 Assistant to Engineer $63.56 8 $98.25 $130.03 $161.81
Group 2-A $70.70 8 $105.39 $140.74 $176.09
Truck Crane Assistant to Engineer $65.49 8 $100.18 $132.93 $165.67 Assistant to Engineer $63.34 8 $98.03 $129.70 $161.37
Group 3-A $69.06 8 $103.75 $138.28 $172.81
Truck Crane Assistant to Engineer $65.25 8 $99.94 $132.57 $165.19 Hydraulic $64.88 8 $99.57 $132.01 $164.45
Assistant to Engineer $63.09 8 $97.78 $129.33 $160.87
Group 4-A $66.15 8 $100.84 $133.92 $166.99
AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination) Wages and total hourly rates (including employer payments) (Area 2):

Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Group b
Basic
Hourly
Rate
Hours
Total
Hourly
Rate
Daily/Saturday
Overtime Hourly
Rate (1½ X) d
Sunday/Holiday
Overtime Hourly
Rate (2X)
Group 1 $73.54 8 $108.23 $145.00 $181.77
Group 2 $72.09 8 $106.78 $142.83 $178.87
Group 3 $70.69 8 $105.38 $140.73 $176.07
Group 4 $69.36 8 $104.05 $138.73 $173.41
Group 5 $68.15 8 $102.84 $136.92 $170.99
Group 6 $66.88 8 $101.57 $135.01 $168.45
Group 7 $65.79 8 $100.48 $133.38 $166.27
Group 8 $64.71 8 $99.40 $131.76 $164.11
Group 8-A $62.59 8 $97.28 $128.58 $159.87
ALL CRANES & ATTACHMENTS:

Group 1
$75.14 8 $109.83 $147.40 $184.97
Truck Crane Assistant to Engineer $68.48 8 $103.17 $137.41 $171.65 Assistant to Engineer $66.31 8 $101.00 $134.16 $167.31
Group 1-A $74.39 8 $109.08 $146.28 $183.47
Truck Crane Assistant to Engineer $67.73 8 $102.42 $136.29 $170.15 Assistant to Engineer $65.56 8 $100.25 $133.03 $165.81
Group 2-A $72.70 8 $107.39 $143.74 $180.09
Truck Crane Assistant to Engineer $67.49 8 $102.18 $135.93 $169.67 Assistant to Engineer $65.34 8 $100.03 $132.70 $165.37
Group 3-A $71.06 8 $105.75 $141.28 $176.81
Truck Crane Assistant to Engineer $67.25 8 $101.94 $135.57 $169.19 Hydraulic $66.88 8 $101.57 $135.01 $168.45
Assistant to Engineer $65.09 8 $99.78 $132.33 $164.87
Group 4-A $68.15 8 $102.84 $136.92 $170.99

Page 443 of 576 ends

Determination: NC-23-63-1-2026-1A

Page 5 of 5 ends

Employer Payments:

Type of Fund Amount per Hour
Health and Welfare $13.38
Pension $12.28
Vacation and Holiday e $6.10
Training $1.31
Other $1.62
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For total base bid project value of less than $3,000,000 only. The Operating Engineer (Heavy and Highway Work) determination is applicable for all work $3,000,000 and above. Where there is a published or advertised estimate of the construction costs of a project, such estimate shall determine the total base bid project value, for the purposes of the three million dollars ($3,000,000) threshold. b For classifications within each group, see Pages 5-7 of the OPERATING ENGINEER (HEAVY AND HIGHWAY WORK).
c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. d Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather.
e Includes an amount for supplemental dues.

Page 444 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

FOR LANDSCAPE CONSTRUCTION PROJECTS
CRAFT: OPERATING ENGINEER#
Determination:

NC-63-3-75-2025-1
Issue Date:

August 22, 2025
Expiration date of determination:

June 30, 2026* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties
AREA 1 - Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).

Wages and Employer Payments (Area 1):

Classificationa
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily
Overtime
Hourly Rate
(1½ X)
Saturday
Overtime
Hourly Rate
(1½ X)c
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group I $55.85 $13.38 $10.85 $4.59 $1.38 $1.42 8 $87.47 $115.395 $115.395 $143.32 Group II $52.25 $13.38 $10.85 $4.59 $1.38 $1.42 8 $83.87 $109.995 $109.995 $136.12 Group III $47.64 $13.38 $10.85 $4.59 $1.38 $1.42 8 $79.26 $103.08 $103.08 $126.90 Group IV $44.93 $13.38 $10.85 $4.59 $1.38 $1.42 8 $76.55 $99.015 $99.015 $121.48

Page 445 of 576 ends

Determination: NC-63-3-75-2025-1

Page 2 of 5 ends

AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).

Wages and Employer Payments (Area 2):

Classificationa
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily
Overtime
Hourly Rate
(1½ X)
Saturday
Overtime
Hourly Rate
(1½ X) c
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group I $57.85 $13.38 $10.85 $4.59 $1.38 $1.42 8 $89.47 $118.395 $118.395 $147.32 Group II $54.25 $13.38 $10.85 $4.59 $1.38 $1.42 8 $85.87 $112.995 $112.995 $140.12 Group III $49.64 $13.38 $10.85 $4.59 $1.38 $1.42 8 $81.26 $106.08 $106.08 $130.90 Group IV $46.93 $13.38 $10.85 $4.59 $1.38 $1.42 8 $78.55 $102.015 $102.015 $125.48 Recognized holidays
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Page 446 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

FOR LANDSCAPE CONSTRUCTION PROJECTS
CRAFT: OPERATING ENGINEER#
(SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-63-3-75-2025-1
Issue Date:

August 22, 2025
Expiration date of determination:

June 30, 2026* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

AREA 1 - Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).

Wages and Employer Payments (Area 1):

Classificationa
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily
Overtime
Hourly Rate
(1½ X)
Saturday
Overtime
Hourly Rate
(1½ X) c
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group I $61.85 $13.38 $10.85 $4.59 $1.38 $1.42 8 $93.47 $124.395 $124.395 $155.32 Group II $58.25 $13.38 $10.85 $4.59 $1.38 $1.42 8 $89.87 $118.995 $118.995 $148.12 Group III $53.64 $13.38 $10.85 $4.59 $1.38 $1.42 8 $85.26 $112.08 $112.08 $138.90 Group IV $50.93 $13.38 $10.85 $4.59 $1.38 $1.42 8 $82.55 $108.015 $108.015 $133.48

Page 447 of 576 ends

Determination: NC-63-3-75-2025-1

Page 4 of 5 ends

AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).

Wages and Employer Payments (Area 2):

Classificationa
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily
Overtime
Hourly Rate
(1½ X)
Saturday
Overtime
Hourly Rate
(1½ X) c
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group 1 $63.85 $13.38 $10.85 $4.59 $1.38 $1.42 8 $95.47 $127.395 $127.395 $159.32 Group 2 $60.25 $13.38 $10.85 $4.59 $1.38 $1.42 8 $91.87 $121.995 $121.995 $152.12 Group 3 $55.64 $13.38 $10.85 $4.59 $1.38 $1.42 8 $87.26 $115.08 $115.08 $142.90 Group 4 $52.93 $13.38 $10.85 $4.59 $1.38 $1.42 8 $84.55 $111.015 $111.015 $137.48 Recognized holidays
Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Page 448 of 576 ends

Determination: NC-63-3-75-2025-1

Page 5 of 5 ends

CLASSIFICATIONS:

Group I
Landscape Finish Grade Operator. All finish grade work regardless of the equipment used, and all equipment with a horsepower rating of more than 65.

Group II
Landscape Operator up to 65 H.P. All equipment with a
manufacturer's horsepower rating of 65 or less except equipment covered by Group I or Group III. The following equipment shall be included in Group II except when used for finish work so long as its manufacturer's horsepower rating is 65 or less.

A-Frame and Winch Truck
Backhoe
Forklift (Jobsite)
HDR Welder - Landscape - Operating Engineer's Equipment Hydro Seeder Machine
Roller
Rubber-Tired and Track Earthmoving Equipment
Skiploader
Straw Blowers
Trencher - 35 Horsepower up to 65 Horsepower
Group III
Landscape Utility Operator
Small Rubber-Tired Tractor
Trencher - Under 35 Horsepower
Group IV
Assistant Landscape Utility Operator Oiler
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For classifications within each group, see Page 5. b Includes an amount for Supplemental Dues. c Saturday in the same workweek may be worked at straight-time if a job is shut down during the normal workweek due to inclement weather, major mechanical breakdown or shortage of materials beyond the control of the Individual Employer.

Page 449 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: #TRAFFIC CONTROL/LANE CLOSURE (LABORER)
AND
#PARKING AND HIGHWAY IMPROVEMENT PAINTER (LABORER)
Determination:

NC-23-102-13-2026-1
Issue Date:

February 22, 2026
Expiration date of determination:

June 30, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

AREA 1 - Alameda, Contra Costa, Marin, San Francisco, San Mateo and Santa Clara Counties.

AREA 2 - Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo and Yuba Counties.

Wages and Employer Payments (Area 1):

Classification

TRAFFIC CONTROL AND

RELATED CLASSIFICATIONS
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation
and
Holidayb
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)c
Saturday
Overtime
Hourly
Rate
(1 ½ X)cd
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)e
Traffic Control Person I $40.21 $11.10 $15.31 $3.91 $0.52 $0.32 8 $71.37 $91.475 $91.475 $111.58 Traffic Control Person II $37.71 $11.10 $15.31 $3.91 $0.52 $0.32 8 $68.87 $87.725 $87.725 $106.58 Construction Zone Traffic
Control Pilot Car, Flag Person
$39.91 $11.10 $15.31 $3.91 $0.52 $0.32 8 $71.07 $91.025 $91.025 $110.98

Page 450 of 576 ends

Determination: NC-23-102-13-2026-1 and NC-23-102-13-2026-1A

Page 2 of 3 ends

Wages and Employer Payments (Area 2):

Classification

TRAFFIC CONTROL AND

RELATED CLASSIFICATIONS
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation
and
Holidayb
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)c
Saturday
Overtime
Hourly
Rate
(1 ½ X)cd
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)e
Traffic Control Person I $39.21 $11.10 $15.31 $3.91 $0.52 $0.32 8 $70.37 $89.975 $89.975 $109.58 Traffic Control Person II $36.71 $11.10 $15.31 $3.91 $0.52 $0.32 8 $67.87 $86.225 $86.225 $104.58 Construction Zone Traffic
Control Pilot Car, Flag Person
$38.91 $11.10 $15.31 $3.91 $0.52 $0.32 8 $70.07 $89.525 $89.525 $108.98 Determination:

NC-23-102-13-2026-1A
Issue Date:

February 22, 2026
Expiration date of determination:

June 30, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Wages and Employer Payments:

Classification

STRIPER AND RELATED

CLASSIFICATIONS
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation
and
Holidayb
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)c
Saturday
Overtime
Hourly
Rate
(1 ½ X)cd
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)e
Group 1 $43.10 $11.10 $14.70 $3.91 $0.52 $0.29 8 $73.62 $95.17 $95.17 $116.72 Group 2 $41.60 $11.10 $14.70 $3.91 $0.52 $0.29 8 $72.12 $92.92 $92.92 $113.72 Group 3 $39.85 $11.10 $14.70 $3.91 $0.52 $0.29 8 $70.37 $90.295 $90.295 $110.22 Group 4 $37.75 $11.10 $14.70 $3.91 $0.52 $0.29 8 $68.27 $87.145 $87.145 $106.02

Page 451 of 576 ends

Determination: NC-23-102-13-2026-1 and NC-23-102-13-2026-1A

Page 3 of 3 ends

Group 1
Traffic Striping Applicator
Group 2
Traffic Delineating Device
Applicator
Traffic Protective System
Installer
Pavement Markings Applicator
Decorative Asphalt Surfacing
Applicator
Group 3
Traffic Surface Abrasive
Blaster
Pot Tender
Group 4
Parking Lots, Game Courts &
Playground Striping
Applicator
Decorative Asphalt Surfacing
Laborer
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Includes an amount for the Annuity Trust Fund. b Includes an amount for Supplemental Dues.
c One and one-half (1-1/2) the straight time hourly rate of pay shall be paid for all work performed in excess of forty hours (40) a week or eight hours (8) a day and the sixth (6th) consecutive day worked or Saturdays. d Saturdays or scheduled sixth (6th) consecutive work day in the same work week may be worked at straight-time if the job is shut down during the normal work week due to inclement weather, major mechanical breakdown or lack of materials beyond the control of the employer. e Two times (2x) the straight time hourly rate of pay shall be paid for all work performed on the seventh (7th) consecutive day worked, or Sundays and holidays.

Page 452 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Pile Driver (Carpenter) #
Determination:

NC-23-31-11-2025-1
Issue Date:

August 22, 2025
Expiration date of determination:

June 30, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All Localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation
and
Holidayb
Training Otherc Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X) d
Saturday
Overtime
Hourly
Rate
(1 ½ X) d
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Pile Driver, Wharf, and
Dock Buildere
$66.26 $14.37 $16.83 $7.28 $1.36 $0.45 8.0 $106.55 $139.68 $139.68 $172.81 Diver (wet) up to 50 ft
depthf g
$115.78 $14.37 $16.83 $7.28 $1.36 $0.45 8.0 $156.07 $213.96 $213.96 $271.85 Diver’s Tenderf $72.89 $14.37 $16.83 $7.28 $1.36 $0.45 8.0 $113.18 $149.63 $149.63 $186.07 Assistant Tender $66.26 $14.37 $16.83 $7.28 $1.36 $0.45 8.0 $106.55 $139.68 $139.68 $172.81 Diver (stand-by) $73.89 $14.37 $16.83 $7.28 $1.36 $0.45 8.0 $114.18 $151.13 $151.13 $188.07

Page 453 of 576 ends

Determination: NC-23-31-11-2025-1

Page 2 of 2 ends

For “Pile Driver – Bridge Builder” – See Northern California Carpenter.

Note:

To obtain wage rate information for Saturation Diver, Manned Submersible, Manifold Operator/Life Support Technician, Remote Controlled/Operated Vehicle (RCV/ROV) Pilot/Technician, Navigator Surveyor, Bell Winch Operator & Diving Equipment Technician, please contact the Office of the Director - Research Unit at (415) 703-4774.

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Includes an amount per hour for Annuity Trust Fund. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages.
b Includes an amount per hour for work fees.
c Includes Industry Promotion, Carpenters International Training Fund, Pile Drivers Employers Contract Administration, Contract Work Preservation, Millwright Pile Driver Fund and Vacation/Holiday/Sick Leave Admin (VHSLA). d Rate applies to the first 2 daily overtime hours and the first 8 hours worked on Saturdays. All other time is paid at the Sunday/Holiday overtime rate. For work associated with cast-in-place piles, drill shaft, Tubex piles, Tubex grout injection piles, geo piles, soil improvement piles, sand piles, augured cast in place piles, CISS and CIDH: Rate applies to all hours worked after 8 hours Monday-Friday and all hours worked on Saturday. e On bridges, powerhouses and dams, men working from bosun’s chairs or swinging scaffolds or suspended from rope, cable, safety belts, or any device used as a substitute for or in lieu thereof (excluding piledriving rigs) shall receive $0.15 per hour above this rate. f Shall receive a minimum of 8 hours pay for any day or part thereof worked. g For specific rates over 50 ft depth, contact the Office of the Director – Research Unit.

Page 454 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY
THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: PILE DRIVER (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)# Determination:

NC-23-63-1-2026-1B
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now.

Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and total hourly rates (including employer payments):

Classification
Basic
Hourly
Rate
Hoursa Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)b
Saturday
Overtime
Hourly Rate
(1 ½ X)c
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group A-1 $68.93 8 $103.62 $138.09 $138.09 $172.55
Truck Crane Assistant to Engineer $61.95 8 $96.64 $127.62 $127.62 $158.59 Assistant to Engineer $59.67 8 $94.36 $124.20 $124.20 $154.03 Group 1 $68.18 8 $102.87 $136.96 $136.96 $171.05
Truck Crane Assistant to Engineer $61.20 8 $95.89 $126.49 $126.49 $157.09 Assistant to Engineer $58.92 8 $93.61 $123.07 $123.07 $152.53 Group 2 $66.36 8 $101.05 $134.23 $134.23 $167.41
Truck Crane Assistant to Engineer $60.95 8 $95.64 $126.12 $126.12 $156.59 Assistant to Engineer $58.65 8 $93.34 $122.67 $122.67 $151.99 Group 3 $64.68 8 $99.37 $131.71 $131.71 $164.05
Truck Crane Assistant to Engineer $60.66 8 $95.35 $125.68 $125.68 $156.01 Assistant to Engineer $58.43 8 $93.12 $122.34 $122.34 $151.55 Group 4 $62.91 8 $97.60 $129.06 $129.06 $160.51
Group 6 $60.27 8 $94.96 $125.10 $125.10 $155.23
Group 8 $58.04 8 $92.73 $121.75 $121.75 $150.77
Employer Payments:

Type of Fund Amount per Hour
Health and Welfare $13.38
Pension $12.28
Vacation and Holidayd $6.10
Training $1.31
Other $1.62

Page 455 of 576 ends

Determination: NC-23-63-1-2026-1B

Page 2 of 5 ends

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Page 456 of 576 ends

Determination: NC-23-63-1-2026-1B

Page 3 of 5 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY
THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: PILE DRIVER (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)# (SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-23-63-1-2026-1B
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now.

Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and total hourly rates (including employer payments):

Classification
Basic
Hourly
Rate
Hours a Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)b
Saturday
Overtime
Hourly Rate
(1 ½ X)c
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group A-1 $74.93 8 $109.62 $147.09 $147.09 $184.55
Truck Crane Assistant to Engineer $67.95 8 $102.64 $136.62 $136.62 $170.59 Assistant to Engineer $65.67 8 $100.36 $133.20 $133.20 $166.03 Group 1 $74.18 8 $108.87 $145.96 $145.96 $183.05
Truck Crane Assistant to Engineer $67.20 8 $101.89 $135.49 $135.49 $169.09 Assistant to Engineer $64.92 8 $99.61 $132.07 $132.07 $164.53 Group 2 $72.36 8 $107.05 $143.23 $143.23 $179.41
Truck Crane Assistant to Engineer $66.95 8 $101.64 $135.12 $135.12 $168.59 Assistant to Engineer $64.65 8 $99.34 $131.67 $131.67 $163.99 Group 3 $70.68 8 $105.37 $140.71 $140.71 $176.05
Truck Crane Assistant to Engineer $66.66 8 $101.35 $134.68 $134.68 $168.01 Assistant to Engineer $64.43 8 $99.12 $131.34 $131.34 $163.55 Group 4 $68.91 8 $103.60 $138.06 $138.06 $172.51
Group 6 $66.27 8 $100.96 $134.10 $134.10 $167.23
Group 8 $64.04 8 $98.73 $130.75 $130.75 $162.77

Page 457 of 576 ends

Determination: NC-23-63-1-2026-1B

Page 4 of 5 ends

Employer Payments:

Type of Fund Amount per Hour
Health and Welfare $13.38
Pension $12.28
Vacation and Holiday d $6.10
Training $1.31
Other $1.62
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Classifications
GROUP A-1
Cranes over 250 Tons
Derrick over 250 Tons
Self Propelled Boom Type Lifting Devices over 250
Tons
GROUP 1
Clamshells Over 7 Cu Yds
Derrick Barge Pedestal Mounted Over 100 Tons
Self Propelled Boom Type Lifting Device Over 100
Tons
Truck Crane Or Crawler, Land Or Barge Mounted
Over 100 Tons
GROUP 2
Clamshells Up To And Including 7 Cu Yds
Derrick Barge Pedestal Mounted 45 Tons Up To And
Including 100 Tons
Fundex F-12 Hydraulic Pile Rig
Self Propelled Boom Type Lifting Device Over 45
Tons
Truck Crane Or Crawler, Land Or Barge Mounted,
Over 45 Tons Up To And Including 100 Tons
GROUP 3
Derrick Barge Pedestal Mounted Under 45 Tons
Self Propelled Boom Type Lifting Device 45 Tons
And Under
Shid/Scow Piledriver, Any Tonnage
Truck Crane Or Crawler, Land Or Barge Mounted 45
Tons And Under
GROUP 4
Assistant Operator
Forklift, 10 Tons And Over
Heavy Duty Repairman/Welder
GROUP 6
Deck Engineer
GROUP 8
Deckhand
Fireman

Page 458 of 576 ends

Determination: NC-23-63-1-2026-1B

Page 5 of 5 ends

# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. b Rate applies to the first 2 daily overtime hours only. All other time is paid at the double time rate. c Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.
d Includes an amount withheld for supplemental dues.

Page 459 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY
THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: PILE DRIVER (OPERATING ENGINEER-BUILDING CONSTRUCTION) # a Determination:

NC-23-63-1-2026-1B1
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now.

Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and total hourly rates (including employer payments):

Classification b
Basic
Hourly
Rate
Hours c Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X) d
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group A-1 $67.45 8 $102.14 $135.87 $135.87 $169.59
Truck Crane Assistant to Engineer $60.80 8 $95.49 $125.89 $125.89 $156.29 Assistant to Engineer $58.63 8 $93.32 $122.64 $122.64 $151.95 Group 1 $66.70 8 $101.39 $134.74 $134.74 $168.09
Truck Crane Assistant to Engineer $60.05 8 $94.74 $124.77 $124.77 $154.79 Assistant to Engineer $57.88 8 $92.57 $121.51 $121.51 $150.45 Group 2 $64.99 8 $99.68 $132.18 $132.18 $164.67
Truck Crane Assistant to Engineer $59.82 8 $94.51 $124.42 $124.42 $154.33 Assistant to Engineer $57.63 8 $92.32 $121.14 $121.14 $149.95 Group 3 $63.38 8 $98.07 $129.76 $129.76 $161.45
Truck Crane Assistant to Engineer $59.55 8 $94.24 $124.02 $124.02 $153.79 Assistant to Engineer $57.40 8 $92.09 $120.79 $120.79 $149.49 Group 4 $61.68 8 $96.37 $127.21 $127.21 $158.05
Group 6 $59.18 8 $93.87 $123.46 $123.46 $153.05
Group 8 $57.04 8 $91.73 $120.25 $120.25 $148.77
Employer Payments:

Type of Fund Amount per Hour
Health and Welfare $13.38
Pension $12.28
Vacation and Holiday e $6.10
Training $1.31
Other $1.62

Page 460 of 576 ends

Determination: NC-23-63-1-2026-1B1

Page 2 of 3 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY
THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: PILE DRIVER (OPERATING ENGINEER- BUILDING CONSTRUCTION) # a (SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-23-63-1-2026-1B1
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now.

Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and total hourly rates (including employer payments):

Classification b
Basic
Hourly
Rate
Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X) d
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group A-1 $73.45 8 $108.14 $144.87 $144.87 $181.59
Truck Crane Assistant to Engineer $66.80 8 $101.49 $134.89 $134.89 $168.29 Assistant to Engineer $64.63 8 $99.32 $131.64 $131.64 $163.95 Group 1 $72.70 8 $107.39 $143.74 $143.74 $180.09
Truck Crane Assistant to Engineer $66.05 8 $100.74 $133.77 $133.77 $166.79 Assistant to Engineer $63.88 8 $98.57 $130.51 $130.51 $162.45 Group 2 $70.99 8 $105.68 $141.18 $141.18 $176.67
Truck Crane Assistant to Engineer $65.82 8 $100.51 $133.42 $133.42 $166.33 Assistant to Engineer $63.63 8 $98.32 $130.14 $130.14 $161.95 Group 3 $69.38 8 $104.07 $138.76 $138.76 $173.45
Truck Crane Assistant to Engineer $65.55 8 $100.24 $133.02 $133.02 $165.79 Assistant to Engineer $63.40 8 $98.09 $129.79 $129.79 $161.49 Group 4 $67.68 8 $102.37 $136.21 $136.21 $170.05
Group 6 $65.18 8 $99.87 $132.46 $132.46 $165.05
Group 8 $63.04 8 $97.73 $129.25 $129.25 $160.77

Page 461 of 576 ends

Determination: NC-23-63-1-2026-1B1

Page 3 of 3 ends

Employer Payments:

Type of Fund Amount per Hour
Health and Welfare $13.38
Pension $12.28
Vacation and Holiday e $6.10
Training $1.31
Other $1.62
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For total base bid project value of less than $3,000,000 only. The Operating Engineer (Heavy and Highway Work) determination is applicable for all work $3,000,000 and above. Where there is a published or advertised estimate of the construction costs of a project, such estimate shall determine the total base bid project value, for the purposes of the three million dollars ($3,000,000) threshold. b For classifications within each group, see Pile Driver (Operating Engineer – Heavy and Highway Work). c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. d Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.
e Includes an amount withheld for supplemental dues.

Page 462 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Slurry Seal Worker (Laborer)
Determination:

NC-23-102-1B-2026-1
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Ratea
Health
and
Welfare
Pension Vacation
and
Holiday
Training Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/Holiday
Overtime
Hourly Rate
(2 X)
Mixer Operator $45.07 $11.10 $13.00 $3.90 $0.10 8.0 $73.17 $95.71 $95.71 $118.24 Shuttle/Line Driver $39.07 $11.10 $13.00 $3.90 $0.10 8.0 $67.17 $86.71 $86.71 $106.24 Squeegee/Sealer $37.57 $11.10 $13.00 $3.90 $0.10 8.0 $65.67 $84.46 $84.46 $103.24 Utility-Maintenance Man $36.57 $11.10 $13.00 $3.90 $0.10 8.0 $64.67 $82.96 $82.96 $101.24 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Page 463 of 576 ends

Determination: NC-23-102-1B-2026-1

Page 2 of 2 ends

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. a Zone Pay at three dollars ($3.00) per hour, factored at the applicable overtime multiplier, will be added to the base rate for work performed outside the Free Zone described by the boundaries along township and range lines. Please see travel and subsistence provision for map description and exceptions.
b Saturdays in the same work week may be worked at straight-time if job is shut down during the normal work week due to inclement weather, major mechanical breakdown or lack of materials beyond the control of the employer.

Page 464 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: STEEL ERECTOR AND FABRICATOR (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)#a Determination:

NC-23-63-1-2026-1D
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and Employer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayb
Training Other Hoursc Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)d
Saturday
Overtime
Hourly
Rate
(1 ½ X)ed
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Group A-1 $69.56 $13.38 $12.28 $6.10 $1.31 $1.62 8 $104.25 $139.03 $139.03 $173.81 Truck Crane Assistant
to Engineer $62.24 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.93 $128.05 $128.05 $159.17 Assistant to Engineer $60.01 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.70 $124.71 $124.71 $154.71 Group 1 $68.81 $13.38 $12.28 $6.10 $1.31 $1.62 8 $103.50 $137.91 $137.91 $172.31 Truck Crane Assistant
to Engineer $61.49 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.18 $126.93 $126.93 $157.67 Assistant to Engineer $59.26 $13.38 $12.28 $6.10 $1.31 $1.62 8 $93.95 $123.58 $123.58 $153.21 Group 2 $67.04 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.73 $135.25 $135.25 $168.77 Truck Crane Assistant
to Engineer $61.27 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.96 $126.60 $126.60 $157.23 Assistant to Engineer $58.99 $13.38 $12.28 $6.10

Page 465 ends

$1.31
of 576
$1.62 8 $93.68 $123.18 $123.18 $152.67
Determination: NC-23-63-1-2026-1D

Page 2 of 4 ends

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayb
Training Other Hoursc Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)d
Saturday
Overtime
Hourly
Rate
(1 ½ X)ed
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Group 3 $65.56 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.25 $133.03 $133.03 $165.81 Truck Crane Assistant
to Engineer $61.00 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.69 $126.19 $126.19 $156.69 Hydraulic $60.61 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.30 $125.61 $125.61 $155.91 Assistant to Engineer $58.77 $13.38 $12.28 $6.10 $1.31 $1.62 8 $93.46 $122.85 $122.85 $152.23 Group 4 $63.54 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.23 $130.00 $130.00 $161.77 Group 5 $62.24 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.93 $128.05 $128.05 $159.17

CLASSIFICATIONS
GROUP A-1
Cranes over 250 Tons
Derrick over 250 Tons
Self Propelled Boom Type Lifting Devices over 250 Tons
GROUP 1
Cranes over 100 tons
Derrick over 100 tons
Self Propelled Boom Type Lifting Device Over 100 Tons
Tower Crane
GROUP 2
Cranes over 45 tons up to and including 100 tons
Derrick, 100 tons and under
Rotating Tele Handler, Magni and similar, Over 45 tons
Self Propelled Boom Type Lifting Device, Over 45 Tons
GROUP 3
Cranes, 45 tons and under
Rotating Tele Handler, Magni and similar, 45 tons and under Self Propelled Boom Type Lifting Device 45 Tons And Under GROUP 4
Chicago Boom
Forklift, 10 Tons And Over
Heavy Duty Repairman/Welder
GROUP 5
Boom Cat

Page 466 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: STEEL ERECTOR AND FABRICATOR (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)#a (SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-23-63-1-2026-1D
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and Employer Payments:

Classification
(Special Single and
Second Shift)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayb
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)d
Saturday
Overtime
Hourly
Rate
(1 ½ X)de
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Group A-1 $75.56 $13.38 $12.28 $6.10 $1.31 $1.62 8 $110.25 $148.03 $148.03 $185.81 Truck Crane Assistant
to Engineer $68.24 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.93 $137.05 $137.05 $171.17 Assistant to Engineer $66.01 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.70 $133.71 $133.71 $166.71 Group 1 $74.81 $13.38 $12.28 $6.10 $1.31 $1.62 8 $109.50 $146.91 $146.91 $184.31 Truck Crane Assistant
to Engineer $67.49 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.18 $135.93 $135.93 $169.67 Assistant to Engineer $65.26 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.95 $132.58 $132.58 $165.21 Group 2 $73.04 $13.38 $12.28 $6.10 $1.31 $1.62 8 $107.73 $144.25 $144.25 $180.77 Truck Crane Assistant
to Engineer $67.27 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.96 $135.60 $135.60 $169.23

Page 467 of 576 ends

Determination: NC-23-63-1-2026-1D

Page 4 of 4 ends

Classification
(Special Single and
Second Shift)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayb
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)d
Saturday
Overtime
Hourly
Rate
(1 ½ X)de
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Assistant to Engineer $64.99 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.68 $132.18 $132.18 $164.67 Group 3 $71.56 $13.38 $12.28 $6.10 $1.31 $1.62 8 $106.25 $142.03 $142.03 $177.81 Truck Crane Assistant
to Engineer $67.00 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.69 $135.19 $135.19 $168.69 Hydraulic $66.61 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.30 $134.61 $134.61 $167.91 Assistant to Engineer $64.77 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.46 $131.85 $131.85 $164.23 Group 4 $69.54 $13.38 $12.28 $6.10 $1.31 $1.62 8 $104.23 $139.00 $139.00 $173.77 Group 5 $68.24 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.93 $137.05 $137.05 $171.17 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For Building Construction, see Steel Erector and Fabricator (Operating Engineer-Building Construction) determination. b Includes an amount for supplemental dues.
c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
d Rate applies to the first 2 daily overtime hours only. All other time is paid at the double time rate. e Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.

Page 468 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: STEEL ERECTOR AND FABRICATOR (OPERATING ENGINEER-BUILDING CONSTRUCTION)#a Determination:

NC-23-63-1-2026-1D1
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and Employer Payments:

Classificationb
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayc
Training Other Hoursd Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)e
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Group A-1 $68.08 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.77 $136.81 $136.81 $170.85 Truck Crane Assistant
to Engineer $61.09 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.78 $126.33 $126.33 $156.87 Assistant to Engineer $58.95 $13.38 $12.28 $6.10 $1.31 $1.62 8 $93.64 $123.12 $123.12 $152.59 Group 1 $67.33 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.02 $135.69 $135.69 $169.35 Truck Crane Assistant
to Engineer $60.34 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.03 $125.20 $125.20 $155.37 Assistant to Engineer $58.20 $13.38 $12.28 $6.10 $1.31 $1.62 8 $92.89 $121.99 $121.99 $151.09 Group 2 $65.62 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.31 $133.12 $133.12 $165.93 Truck Crane Assistant
to Engineer $60.12 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.81 $124.87 $124.87 $154.93 Assistant to Engineer $57.95 $13.38 $12.28 $6.10 $1.31 $1.62 8 $92.64 $121.62 $121.62 $150.59 Group 3 $64.23 $13.38 $12.28 $6.10

Page 469 ends

$1.31
of 576
$1.62 8 $98.92 $131.04 $131.04 $163.15
Determination: NC-23-63-1-2026-1D1

Page 2 of 5 ends

Classificationb
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayc
Training Other Hoursd Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)e
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Truck Crane Assistant
to Engineer $59.87 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.56 $124.50 $124.50 $154.43 Hydraulic $59.49 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.18 $123.93 $123.93 $153.67 Assistant to Engineer $57.72 $13.38 $12.28 $6.10 $1.31 $1.62 8 $92.41 $121.27 $121.27 $150.13 Group 4 $62.30 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.99 $128.14 $128.14 $159.29 Group 5 $61.05 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.74 $126.27 $126.27 $156.79

Page 470 of 576 ends

Determination: NC-23-63-1-2026-1D1

Page 3 of 5 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: STEEL ERECTOR AND FABRICATOR (OPERATING ENGINEER-BUILDING CONSTRUCTION) #a
(SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-23-63-1-2026-1D1
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba counties.

Wages and Employer Payments:

Classificationb
(Special Single and
Second Shift)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayc
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)e
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Group A-1 $74.08 $13.38 $12.28 $6.10 $1.31 $1.62 8 $108.77 $145.81 $145.81 $182.85 Truck Crane
Assistant to Engineer $67.09 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.78 $135.33 $135.33 $168.87 Assistant to Engineer $64.95 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.64 $132.12 $132.12 $164.59 Group 1 $73.33 $13.38 $12.28 $6.10 $1.31 $1.62 8 $108.02 $144.69 $144.69 $181.35 Truck Crane
Assistant to Engineer $66.34 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.03 $134.20 $134.20 $167.37 Assistant to Engineer $64.20 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.89 $130.99 $130.99 $163.09 Group 2 $71.62 $13.38 $12.28 $6.10
Page
$1.31
471 of 576
$1.62 8 $106.31 $142.12 $142.12 $177.93
Determination: NC-23-63-1-2026-1D1

Page 4 of 5 ends

Classificationb
(Special Single and
Second Shift)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayc
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)e
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Truck Crane
Assistant to Engineer $66.12 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.81 $133.87 $133.87 $166.93 Assistant to Engineer $63.95 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.64 $130.62 $130.62 $162.59 Group 3 $70.23 $13.38 $12.28 $6.10 $1.31 $1.62 8 $104.92 $140.04 $140.04 $175.15 Truck Crane
Assistant to Engineer $65.87 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.56 $133.50 $133.50 $166.43 Hydraulic $65.49 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.18 $132.93 $132.93 $165.67 Assistant to Engineer $63.72 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.41 $130.27 $130.27 $162.13 Group 4 $68.30 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.99 $137.14 $137.14 $171.29 Group 5 $67.05 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.74 $135.27 $135.27 $168.79 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For total base bid project value of less than $3,000,000 only. The Operating Engineer (Heavy and Highway Work) determination is applicable for all work $3,000,000 and above. Where there is a published or advertised estimate of the construction costs of a project, such estimate shall determine the total base bid project value, for the purposes of the three million dollars ($3,000,000) threshold. b For classifications within each group, see Steel Erector and Fabricator (Operating Engineer-Heavy And Highway Work) Determination. c Includes an amount for supplemental dues.

Page 472 of 576 ends

Determination: NC-23-63-1-2026-1D1

Page 5 of 5 ends

d When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. e Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.

Page 473 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: TEAMSTER (APPLIES ONLY TO WORK ON THE CONSTRUCTION SITE) Determination:

NC-23-261-1-2025-1
Issue Date:

August 22, 2025
Expiration date of determination:

June 30, 2026* Effective until superseded by a new determination issued by the Director of Industrial Relation. Contact the Office of the Director - Research Unit at (415) 703-4774 for the new rates after ten days after the expiration date if no subsequent determination is issued.

Localities:

All Localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

WAGE RATES AND TOTAL HOURLY RATES (including employer payments):

Classificationa
(Journeyperson)
Basic Hourly
Rate Hours Total Hourly Rate
Daily
Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group 1 $43.26 8 $78.37 $100.00 $100.00 $121.63
Group 2 $43.56 8 $78.67 $100.45 $100.45 $122.23
Group 3 $43.86 8 $78.97 $100.90 $100.90 $122.83
Group 4 $44.21 8 $79.32 $101.43 $101.43 $123.53
Group 5 $44.56 8 $79.67 $101.95 $101.95 $124.23
Group 6 USE DUMP TRUCK YARDAGE RATE
Group 7 USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED Group 8 (Trainee)c
d Step I – 1st 1000 Hours e Step II – 2nd 1000 Hours
f Step III – 3rd 1000 Hours

Page 474 of 576 ends

Determination: NC-023-261-1 and NC-023-261-1A

Page 2 of 6 ends

EMPLOYER PAYMENTS:

Type of Fund Amount per Hour Worked
Health & Welfare $21.27
Pension $9.46
Vacation and Holiday $2.30
Training $1.25
Otherg $0.83

Page 475 of 576 ends

Determination: NC-023-261-1 and NC-023-261-1A

Page 3 of 6 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: TEAMSTER (SPECIAL SINGLE SHIFT RATE)
(APPLIES ONLY TO WORK ON THE CONSTRUCTION SITE)
Determination:

NC-23-261-1-2025-1A
Issue Date:

August 22, 2025
Expiration date of determination:

June 30, 2026* Effective until superseded by a new determination issued by the Director of Industrial Relation. Contact the Office of the Director - Research Unit at (415) 703-4774 for the new rates after ten days after the expiration date if no subsequent determination is issued.

Localities:

All Localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

WAGE RATES AND TOTAL HOURLY RATES (including employer payments):

Classificationa
(Journeyperson)
Basic Hourly
Rate
Hours Total Hourly
Rate
Daily Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group 1 $45.26 8 $80.37 $103.00 $103.00 $125.63
Group 2 $45.56 8 $80.67 $103.45 $103.45 $126.33
Group 3 $45.86 8 $80.97 $103.90 $103.90 $126.83
Group 4 $46.21 8 $81.32 $104.43 $104.43 $127.53
Group 5 $46.56 8 $81.67 $104.95 $104.95 $128.23
Group 6 USE DUMP TRUCK YARDAGE RATE
Group 7 USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED

Page 476 of 576 ends

Determination: NC-023-261-1 and NC-023-261-1A

Page 4 of 6 ends

Classificationa
(Journeyperson)
Basic Hourly
Rate
Hours Total Hourly
Rate
Daily Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly Rate
(2 X)
Group 8 (Trainee)c
d Step I – 1st 1000 Hours e Step II – 2nd 1000 Hours
f Step III – 3rd 1000 Hours
EMPLOYER PAYMENTS:

Type of Fund Amount per Hour Worked
Health & Welfare $21.27
Pension $9.46
Vacation and Holiday $2.30
Training $1.25
Otherg $0.83

Page 477 of 576 ends

Determination: NC-023-261-1 and NC-023-261-1A

Page 5 of 6 ends

CLASSIFICATIONS:

GROUP 1
Dump Trucks under 6 yards
Single Unit Flat Rack (2 axle unit)
Nipper Truck (When Flat Rack Truck is used appropriate
Flat Rack shall apply)
Concrete pump truck (When Flat Rack Truck is used
appropriate Flat Rack shall apply)
Concrete pump machine
Snow Buggy
Steam Cleaning
Bus or Manhaul Driver
Escort or Pilot Car Driver
Pickup Truck
Teamster Oiler/Greaser/and or Serviceman
Hook Tenders
Team Drivers
Warehouseman
Tool Room Attendant (Refineries)
Fork Lift and Lift Jitneys
Warehouse Clerk/Parts Man
Fuel and/or Grease Truck Driver or Fuelman
Truck Repair Helper
Fuel Island Attendant, or Combination Pit and/or Grease Rack and Fuel Island Attendant
GROUP 2
Dump Trucks 6 yards Under 8 yards
Transit Mixers through 10 yards
Water Trucks Under 7000 gals.

Jetting Trucks Under 7000 gals.

Single Unit flat rack (3 axle unit)
Highbed Heavy Duty Transport
Scissor Truck
Rubber Tired Muck Car (not self-loaded)
Rubber Tired Truck Jumbo
Winch Truck and “A” Frame Drivers
Combination Winch Truck With Hoist
Road Oil Truck or Bootman
Buggymobile
Ross, Hyster and similar Straddle Carrier
Small Rubber Tired Tractor
Truck Dispatcher
GROUP 3
Dump Trucks 8 yards and including 24 yards
Transit Mixers Over 10 yards
Water Trucks 7000 gals and over
Jetting Trucks 7000 gals and over
Vacuum Trucks under 7500 gals
Trucks Towing Tilt Bed or Flat Bed Pull Trailers
Heavy Duty Transport Tiller Man
Tire Repairman
Truck Mounted Self Propelled Street Sweeper with or without Self-Contained Refuse Bin and or Vacuum Unit
Boom Truck - Hydro-Lift or Swedish Type Extension or Retracting Crane
P.B. or Similar Type Self Loading Truck
Combination Bootman and Road Oiler
Dry Distribution Truck (A Bootman when employed on such equipment, shall receive the rate specified for the classification of Road Oil Trucks or Bootman)
Ammonia Nitrate Distributor, Driver and Mixer
Snow Go and/or Plow
GROUP 4
Dump Trucks over 25 yards and under 65 yards
Vacuum Trucks 7500 gals and over.

Truck Repairman
Water Pulls - DW 10s, 20s, 21s and other similar equipment when pulling Aqua/pak or Water Tank Trailers
Helicopter Pilots
Lowbed Heavy Duty Transport (up to and including 7 axles) DW 10s, 20s, 21s and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type Equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers

Page 478 of 576 ends

Determination: NC-023-261-1 and NC-023-261-1A

Page 6 of 6 ends

GROUP 5
Dump Truck 65 yards and over
Holland Hauler
Lowbed Heavy Duty Transport (over 7 axles)
GROUP 6 (Use dump truck yardage rate)
Articulated Dump Truck
Bulk Cement Spreader (w/ or w/o Auger)
Dumpcrete Truck
Skid Truck (Debris Box)
Dry Pre-Batch Concrete Mix Trucks
Dumpster or Similar Type
Slurry Truck
GROUP 7 (Use appropriate Rate for the Power Unit or the Equipment Utilized)
Heater Planer
Asphalt Burner
Scarifier Burner
Fire Guard
Industrial Lift Truck (mechanical tailgate)
Utility and Clean-up Truck
Composite Crewman
GROUP 8
Trainee
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. a For classifications within each group, see Pages 5 and 6. b Saturday in the same work week may be worked at straight-time hourly rate if a job is shut down during the normal work week due to inclement weather or major mechanical breakdown, or lack of materials beyond the control of the Employer. c An individual employer may employ one (1) trainee for every four (4) journey level Teamsters actively employed. Individual employers with less than four (4) journey level Teamsters may utilize one (1) trainee; thereafter, one (1) for every four (4) journey level Teamsters. d Sixty-five percent (65%) of the Journey level wage for the type of equipment operated, plus full fringes without Vacation/Holiday. e Seventy-five percent (75%) of the Journey level wage for the type of equipment operated, plus full fringes without Vacation/Holiday. f
Eighty-five percent (85%) of the Journey level wage for the type of equipment operated, plus full fringes without Vacation/Holiday. g Supplemental Dues and Contract Administration.

Page 479 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Tree Maintenance (Laborer) 1
(Applies Only to Routine Tree Maintenance Work, Not Construction and/or Landscape Construction) 2 Determination:

NC-102-X-21-2025-1
Issue Date:

August 22, 2025
Expiration date of determination:

June 30, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All Localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Wages and Employer Payments:

Classification(s)a
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Senior Tree Trimmer (Area 1)c $31.50 $6.00 $3.46 $2.21 $0.00 $0.05 8.0 $43.22 $58.97 $74.72 Tree Trimmer (Area 1)c $28.30 $6.00 $3.46 $2.21 $0.00 $0.05 8.0 $40.02 $54.17 $68.32 Groundsperson (Area 1)c $25.15 $6.00 $3.46 $2.21 $0.00 $0.05 8.0 $36.87 $49.445 $62.02 Senior Tree Trimmer (Area 2)c $27.00 $6.00 $3.46 $2.21 $0.00 $0.05 8.0 $38.72 $52.22 $65.72 Tree Trimmer (Area 2)c $25.30 $6.00 $3.46 $2.21 $0.00 $0.05 8.0 $37.02 $49.67 $62.32 Groundsperson (Area 2)c $23.15 $6.00 $3.46 $2.21 $0.00 $0.05 8.0 $34.87 $46.445 $58.02 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid

Page 480 of 576 ends

Determination: NC-102-X-21-2025-1

Page 2 of 2 ends

shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. 1 This determination does not apply to the work of a landscape laborer employed on landscape construction (work incidental to construction or post-construction maintenance during the plant installation and establishment period) or to tree trimming work involving line clearance. 2 This determination does not apply to tree trimming, removal, or planting work performed on construction or landscape construction contracts. a There shall be at least one Senior Tree Trimmer on crews of three or more. b Monday thru Saturday shall constitute a workweek. Rate applies to first 4 overtime hours Monday thru Saturday, and all time worked in excess of forty (40) hours per workweek. All other time is paid at the Sunday and Holiday double-time rate. c Area 1: Marin, Monterey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, and Sonoma Counties.

Area 2: Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Nevada, Placer, Plumas, Sacramento, San Joaquin, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Page 481 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Tunnel Worker (Laborer) #
Determination:

NC-23-102-11-2025-1
Issue Date:

August 22, 2025
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All Localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Wages and Total Hourly Rates (including employer payments):

Classification
(Journeyperson)
Basic
Hourly
Rate
Hoursa
Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
Diamond driller, groundman, gunite or shotcrete nozzleman $50.92 8.0 $82.54 $108.00 $108.00 $133.46 Rodman, shaft work and raise (below actual or excavated ground level) $50.69 8.0 $82.31 $107.655 $107.655 $133.00 Bit grinder, blaster, driller, powderman-heading, cherry pickermanwhere car is lifted, concrete finisher in tunnel, concrete/screed man, grout pumpman and potman, gunite and shotcrete gunman and potman, headerman, high pressure nozzleman, miner-tunnel, including top and bottom man on shaft and raise work, nipper, nozzleman on slick line, sandblaster-potman (work assignment interchangeable)
$50.44 8.0 $82.06 $107.28 $107.28 $132.50

Page 482 of 576 ends

Determination: NC-23-102-11-2025-1

Page 2 of 3 ends

Classification
(Journeyperson)
Basic
Hourly
Rate
Hoursa
Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
Steel form raiser and setter, timberman, retimberman (wood or steel or substitute materials), tugger, cabletender, certified welder, chucktender, powderman-primer house
$50.44 8.0 $82.06 $107.28 $107.28 $132.50
Vibratorman, pavement breaker, bull gang-mucker, trackman, concrete crew including rodding and spreading $49.99 8.0 $81.61 $106.605 $106.605 $131.60 Dumpman (any method), grout crew, reboundman, swamper/brakeman, watchman $49.45 8.0 $81.07 $105.795 $105.795 $130.52
Wages and Total Hourly Rates (including employer payments) – Special Single and Second Shift:

Classification
(Journeyperson)
Basic
Hourly
Rate
Hoursa
Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
Diamond driller, groundman, gunite or shotcrete nozzleman $53.92 8.0 $85.54 $112.50 $112.50 $139.46 Rodman, shaft work and raise (below actual or excavated ground level) $53.69 8.0 $85.31 $112.155 $112.155 $139.00 Bit grinder, blaster, driller, powderman-heading, cherry pickerman-where car is lifted, concrete finisher in tunnel, concrete/screed man, grout pumpman and potman, gunite and shotcrete gunman and potman, headerman, high pressure nozzleman, miner-tunnel, including top and bottom man on shaft and raise work, nipper, nozzleman on slick line, sandblaster-potman (work assignment interchangeable)
$53.44 8.0 $85.06 $111.78 $111.78 $138.50
Steel form raiser and setter, timberman, retimberman (wood or steel or substitute materials), tugger, cabletender, certified welder, chucktender, powderman-primer house
$53.44 8.0 $85.06 $111.78 $111.78 $138.50
Vibratorman, pavement breaker, bull gang-mucker, trackman, concrete crew including rodding and spreading $52.99 8.0 $84.61 $111.105 $111.105 $137.60 Dumpman (any method), grout crew, reboundman, swamper/brakeman, watchman $52.45 8.0 $84.07 $110.295 $110.295 $136.52

Page 483 of 576 ends

Determination: NC-23-102-11-2025-1

Page 3 of 3 ends

Employer Payments (All Shifts):

Type of Fund Amount
Health and Welfare $11.10
Pension $15.31
Vacation and Holidayc $3.91
Training $0.98
Other $0.32
When designated by an employer, state licensed blaster receives $1.00 per hour above miner’s rate.

Note:

Rates for tunnel workers working in compressed air as well as their support classifications are available by request. Please contact the Office of the Director - Research Unit at (415) 703-4774.

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.
# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Saturdays in the same work week may be worked at straight-time if job is shut down during the normal workweek due to inclement weather. Excludes Alameda, Contra Costa, and San Francisco Counties. b All work performed on Saturdays, Sundays and Holidays shall be paid for at double (2x) the regular time hourly rate, except maintenance work, in the counties of Alameda, Contra Costa, and San Francisco. c Includes an amount for supplemental dues.

Page 484 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: TUNNEL/UNDERGROUND (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)# Determination:

NC-23-63-1-2026-1C
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

AREA 1 - Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination)
Wages and Employer Payments (Area 1):

Classification
(Journeyperson)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours c
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $65.43 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.12 $132.84 $165.55 Underground Rate Group 1 $62.96 $13.38 $12.28 $6.10 $1.31 $1.62 8 $97.65 $129.13 $160.61 Underground Rate Group 2 $61.70 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.39 $127.24 $158.09 Underground Rate Group 3 $60.37 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.06 $125.25 $155.43 Underground Rate Group 4 $59.23 $13.38 $12.28 $6.10 $1.31 $1.62 8 $93.92 $123.54 $153.15 Underground Rate Group 5 $58.09 $13.38 $12.28 $6.10 $1.31 $1.62 8 $92.78 $121.83 $150.87 Shafts Stopes & Raises Group 1-A $65.53 $13.38 $12.28
Page
$6.10 $1.31 $1.62 8 $100.22 $132.99 $165.75
485 of 576
Determination: NC-23-63-1-2026-1C

Page 2 of 6 ends

Classification
(Journeyperson)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours c
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Shafts Stopes & Raises Group 1 $63.06 $13.38 $12.28 $6.10 $1.31 $1.62 8 $97.75 $129.28 $160.81 Shafts Stopes & Raises Group 2 $61.80 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.49 $127.39 $158.29 Shafts Stopes & Raises Group 3 $60.47 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.16 $125.40 $155.63 Shafts Stopes & Raises Group 4 $59.33 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.02 $123.69 $153.35 Shafts Stopes & Raises Group 5 $58.19 $13.38 $12.28 $6.10 $1.31 $1.62 8 $92.88 $121.98 $151.07 AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).

Wages and Employer Payments (Area 2):

Classification
(Journeyperson)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hoursc
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $67.43 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.12 $135.84 $169.55 Underground Rate Group 1 $64.96 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.65 $132.13 $164.61 Underground Rate Group 2 $63.70 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.39 $130.24 $162.09 Underground Rate Group 3 $62.37 $13.38 $12.28 $6.10 $1.31 $1.62 8 $97.06 $128.25 $159.43 Underground Rate Group 4 $61.23 $13.38 $12.28 $6.10 $1.31 $1.62 8 $95.92 $126.54 $157.15 Underground Rate Group 5 $60.09 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.78 $124.83 $154.87 Shafts Stopes & Raises Group 1-A $67.53 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.22 $135.99 $169.75 Shafts Stopes & Raises Group 1 $65.06 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.75 $132.28 $164.81 Shafts Stopes & Raises Group 2 $63.80 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.49 $130.39 $162.29 Shafts Stopes & Raises Group 3 $62.47 $13.38 $12.28 $6.10 $1.31 $1.62 8 $97.16 $128.40 $159.63 Shafts Stopes & Raises Group 4 $61.33 $13.38 $12.28 $6.10 $1.31 $1.62 8 $96.02 $126.69 $157.35 Shafts Stopes & Raises Group 5 $60.19 $13.38 $12.28 $6.10 $1.31 $1.62 8 $94.88 $124.98 $155.07

Page 486 of 576 ends

Determination: NC-23-63-1-2026-1C

Page 3 of 6 ends

CLASSIFICATIONS
GROUP 1-A
Tunnel Bore Machine Operator - 20 feet in diameter or more GROUP 1
Heading Shield Operator
Heavy Duty Repairman/Welder
Mucking Machine
Raised Bore Operator
Tunnel Mole Bore Operator
Tunnel Boring Machine Operator 10 ft up to 20 ft
GROUP 2
Combination Slusher and Motor Operator
Concrete Pump or Pumpcrete Guns
Power Jumbo Operator
GROUP 3
Drill Doctor
Mine or Shaft Hoist
GROUP 4
Combination Slurry Mixer Cleaner
Grouting Machine Operator
Motorman
GROUP 5
Bit Sharpener
Brakeman
Combination Mixer and Compressor (Gunite)
Compressor Operator
Assistant to Engineer
Pump Operator
Slusher Operator

Page 487 of 576 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: TUNNEL/UNDERGROUND (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK# (SPECIAL SINGLE AND SECOND SHIFT)
Determination:

NC-23-63-1-2026-1C
Issue Date:

February 22, 2026
Expiration date of determination:

June 28, 2026** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Marin, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

AREA 1 - Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination)
Wages and Employer Payments (Area 1):

Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $71.43 $13.38 $12.28 $6.10 $1.31 $1.62 8 $106.12 $141.84 $177.55 Underground Rate Group 1 $68.96 $13.38 $12.28 $6.10 $1.31 $1.62 8 $103.65 $138.13 $172.61 Underground Rate Group 2 $67.70 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.39 $136.24 $170.09 Underground Rate Group 3 $66.37 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.06 $134.25 $167.43 Underground Rate Group 4 $65.23 $13.38 $12.28 $6.10 $1.31 $1.62 8 $99.92 $132.54 $165.15

Page 488 of 576 ends

Determination: NC-23-63-1-2026-1C

Page 5 of 6 ends

Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly Rate
(1½ x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 5 $64.09 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.78 $130.83 $162.87 Shafts Stopes & Raises Group 1-A $71.53 $13.38 $12.28 $6.10 $1.31 $1.62 8 $106.22 $141.99 $177.75 Shafts Stopes & Raises Group 1 $69.06 $13.38 $12.28 $6.10 $1.31 $1.62 8 $103.75 $138.28 $172.81 Shafts Stopes & Raises Group 2 $67.80 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.49 $136.39 $170.29 Shafts Stopes & Raises Group 3 $66.47 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.16 $134.40 $167.63 Shafts Stopes & Raises Group 4 $65.33 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.02 $132.69 $165.35 Shafts Stopes & Raises Group 5 $64.19 $13.38 $12.28 $6.10 $1.31 $1.62 8 $98.88 $130.98 $163.07 AREA 2 - Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination) Wages and Employer Payments (Area 2):

Classification
(Journeyperson)
(Special Single and Second Shift)
Classification Groupa
Basic
Hourly
Rate
Health
and
Welfare
Pension
Vacation
and
Holidayb
Training Other Hours
Total
Hourly
Rate
Daily/
Saturday
Overtime
Hourly
Rate (1½
x)d
Sunday/
Holiday
Overtime
Hourly Rate
(2 x)
Underground Rate Group 1-A $73.43 $13.38 $12.28 $6.10 $1.31 $1.62 8 $108.12 $144.84 $181.55 Underground Rate Group 1 $70.96 $13.38 $12.28 $6.10 $1.31 $1.62 8 $105.65 $141.13 $176.61 Underground Rate Group 2 $69.70 $13.38 $12.28 $6.10 $1.31 $1.62 8 $104.39 $139.24 $174.09 Underground Rate Group 3 $68.37 $13.38 $12.28 $6.10 $1.31 $1.62 8 $103.06 $137.25 $171.43 Underground Rate Group 4 $67.23 $13.38 $12.28 $6.10 $1.31 $1.62 8 $101.92 $135.54 $169.15 Underground Rate Group 5 $66.09 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.78 $133.83 $166.87 Shafts Stopes & Raises Group 1-A $73.53 $13.38 $12.28 $6.10 $1.31 $1.62 8 $108.22 $144.99 $181.75 Shafts Stopes & Raises Group 1 $71.06 $13.38 $12.28 $6.10 $1.31 $1.62 8 $105.75 $141.28 $176.81 Shafts Stopes & Raises Group 2 $69.80 $13.38 $12.28 $6.10 $1.31 $1.62 8 $104.49 $139.39 $174.29 Shafts Stopes & Raises Group 3 $68.47 $13.38 $12.28 $6.10 $1.31 $1.62 8 $103.16 $137.40 $171.63 Shafts Stopes & Raises Group 4 $67.33 $13.38 $12.28 $6.10 $1.31 $1.62 8 $102.02 $135.69 $169.35 Shafts Stopes & Raises Group 5 $66.19 $13.38 $12.28 $6.10 $1.31 $1.62 8 $100.88 $133.98 $167.07

Page 489 of 576 ends

Determination: NC-23-63-1-2026-1C

Page 6 of 6 ends

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a For classifications within each group, see page 3. b Includes an amount for supplemental dues.
c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate. d Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather.

Page 490 of 576 ends

"General Decision Number: CA20260018 05/18/2026
State: California
Construction Types: Building, Heavy and Highway
Counties: California Counties of
Alameda, Calaveras, Contra Costa,
Fresno, Kings, Madera, Mariposa, Merced,
Monterey, San Benito, San Francisco, San
Joaquin, San Mateo, Santa Clara, Santa
Cruz, Stanislaus and Tuolumne
Building Construction Projects
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects
Modification Number Publication Date
4 01/30/2026
5 05/18/2026
ASBE0016-004 05/01/2025
Rates Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:

INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL

INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2).......$ 44.73 12.75 ---------------------------------------------------------------- ASBE0016-008 01/01/2024
Rates Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE

APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 2).........................$ 64.56 25.07 ASBESTOS WORKERS/INSULATOR: INCLUDES THE

APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 1).........................$ 84.76 25.07 ---------------------------------------------------------------- BOIL0549-001 01/01/2021
Rates Fringes
BOILERMAKER: (AREA 2)..............................$ 45.60 38.99 BOILERMAKER: (AREA 1)..............................$ 49.62 41.27 ---------------------------------------------------------------- BRCA0003-001 08/01/2024
Rates Fringes
MARBLE FINISHER.....................................$ 42.06 19.80 ---------------------------------------------------------------- BRCA0003-003 08/01/2024

Page 491 of 576 ends

Rates Fringes
MARBLE MASON........................................$ 61.72 30.31 ---------------------------------------------------------------- BRCA0003-005 05/01/2024
Rates Fringes
BRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO,
SANTA CLARA)........................................$ 56.94 26.28 BRICKLAYER (16) MONTEREY, SANTA CRUZ................$ 54.18 27.82 BRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS,
TOULUMNE............................................$ 52.76 25.01 BRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO............$ 57.02 28.50 BRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA,
MERCED..............................................$ 51.17 25.80 ---------------------------------------------------------------- BRCA0003-008 07/01/2024
Rates Fringes
TERRAZZO WORKER/SETTER..............................$ 60.58 29.79 TERRAZZO FINISHER...................................$ 44.93 20.98 ---------------------------------------------------------------- BRCA0003-011 04/01/2024
Rates Fringes
TILE LAYER AREA 3...................................$ 50.28 22.05 TILE LAYER AREA 2...................................$ 55.17 22.52 TILE LAYER AREA 1...................................$ 59.92 22.62 TILE FINISHER AREA 3................................$ 32.68 18.32 TILE FINISHER AREA 2................................$ 34.76 19.22 TILE FINISHER AREA 1................................$ 37.75 19.28 ---------------------------------------------------------------- CARP0022-001 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY).......$ 60.49 35.11 CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO
COUNTY).............................................$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)...........$ 60.54 33.52 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
FRANCISCO COUNTY)...................................$ 60.39 33.52 ---------------------------------------------------------------- CARP0034-001 07/01/2021
Rates Fringes
DIVER: MANIFOLD OPERATOR (STANDBY) DEPTH PAY
(SURFACE DIVING): 050 TO 100 FT $2.00 PER
FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00
PER FOOT SATURATION DIVING: THE STANDBY RATE
SHALL APPLY UNTIL SATURATION STARTS. THE

SATURATION DIVING RATE APPLIES WHEN DIVERS ARE

UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO

ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE

THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS

NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING

Page 492 of 576 ends

IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE

DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE

PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 59.51 34.69 DIVER: MANIFOLD OPERATOR (MIXED GAS) DEPTH PAY
(SURFACE DIVING): 050 TO 100 FT $2.00 PER
FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00
PER FOOT SATURATION DIVING: THE STANDBY RATE
SHALL APPLY UNTIL SATURATION STARTS. THE

SATURATION DIVING RATE APPLIES WHEN DIVERS ARE

UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO

ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE

THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS

NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING

IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE

DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE

PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 64.51 34.69 DIVER: DIVER WET DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT
$3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT
221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE

APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.

DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR

DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER

ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.

WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES

WORKING IN ANY COMBINATION OF CLASSIFICATIONS

WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN

A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT.........................$ 103.62 34.69 DIVER: DIVER TENDER DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT
$3.00 PER FOOT 151 TO 220 FT $4.00 PER
FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE

APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.

DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR

DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER

ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.

WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN

Page 493 of 576 ends

HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES

WORKING IN ANY COMBINATION OF CLASSIFICATIONS

WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN

A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT.........................$ 59.51 34.69 DIVER: DIVER STANDBY DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150
FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER
FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE

APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.

DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR

DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER

ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.

WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES

WORKING IN ANY COMBINATION OF CLASSIFICATIONS

WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN

A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT.........................$ 60.51 34.69 DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN
DEPTH PAY (SURFACE DIVING): 050 TO 100 FT
$2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT
151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER
$5.00 PER FOOT SATURATION DIVING: THE STANDBY
RATE SHALL APPLY UNTIL SATURATION STARTS. THE

SATURATION DIVING RATE APPLIES WHEN DIVERS ARE

UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO

ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE

THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS

NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING

IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE

DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE

PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 54.10 34.69 ---------------------------------------------------------------- CARP0034-003 07/01/2021
Rates Fringes
PILEDRIVER..........................................$ 54.10 34.69 ---------------------------------------------------------------- CARP0035-007 07/01/2020
Rates Fringes

MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA

3...................................................$ 31.38 23.03

MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA

2...................................................$ 32.71 23.03

MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA

Page 494 of 576 ends

1...................................................$ 36.43 23.03 LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3.$ 27.96 23.03 LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2.$ 29.08 23.03 LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1.$ 32.21 23.03 INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3......$ 25.16 22.53 INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2......$ 26.11 22.53 INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1......$ 28.76 22.53 ---------------------------------------------------------------- CARP0035-008 08/01/2020
Rates Fringes
DRYWALL STOCKER/SCRAPPER: (AREA 4).................$ 22.97 18.22 DRYWALL STOCKER/SCRAPPER: (AREA 3).................$ 23.64 18.22 DRYWALL STOCKER/SCRAPPER: (AREA 2).................$ 23.39 18.22 DRYWALL STOCKER/SCRAPPER: (AREA 1).................$ 26.33 18.22 DRYWALL INSTALLERS/LATHERS:: (AREA 4)..............$ 45.92 31.26 DRYWALL INSTALLERS/LATHERS:: (AREA 3)..............$ 47.27 31.26 DRYWALL INSTALLERS/LATHERS:: (AREA 2)..............$ 46.77 31.26 DRYWALL INSTALLERS/LATHERS:: (AREA 1)..............$ 52.65 31.26 ---------------------------------------------------------------- CARP0152-001 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)........$ 52.75 32.41 CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA
COUNTY).............................................$ 52.65 30.82 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (CONTRA COSTA COUNTY)............$ 52.80 30.82 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(CONTRA COSTA COUNTY)...............................$ 52.65 30.82 ---------------------------------------------------------------- CARP0152-002 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN JOAQUIN COUNTY).........$ 49.27 32.41 CARPENTERS: JOURNEYMAN CARPENTER (SAN JOAQUIN
COUNTY).............................................$ 46.77 30.82 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN JOAQUIN COUNTY)...........$ 46.92 30.82 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
JOAQUIN COUNTY).....................................$ 52.65 30.82 ---------------------------------------------------------------- CARP0152-004 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT (CALAVERAS, MARIPOSA,
MERCED, STANISLAUS AND TUOLUMNE COUNTIES)...........$ 47.92 32.41 CARPENTERS: JOURNEYMAN CARPENTER (CALAVERAS,
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES).$ 45.42 30.82 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING

ERECTOR, SAW FILER CALAVERAS, MARIPOSA, MERCED,
STANISLAUS AND TUOLUMNE COUNTIES....................$ 45.57 30.82 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND
TUOLUMNE COUNTIES)..................................$ 52.65 30.82 ---------------------------------------------------------------- CARP0217-001 07/01/2023
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)...........$ 60.49 35.11 CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

Page 495 of 576 ends

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN MATEO COUNTY)...............$ 60.54 33.52 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
MATEO COUNTY).......................................$ 60.39 33.52 ---------------------------------------------------------------- CARP0405-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY).........$ 54.95 33.08 CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA
COUNTY).............................................$ 54.85 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SANTA CLARA COUNTY).............$ 55.00 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA
CLARA COUNTY).......................................$ 54.85 31.49 ---------------------------------------------------------------- CARP0405-002 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)..........$ 51.47 33.08 CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO
COUNTY).............................................$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN BENITO COUNTY)..............$ 49.12 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
BENITO COUNTY)......................................$ 54.85 31.49 ---------------------------------------------------------------- CARP0505-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)..........$ 51.47 33.08 CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ
COUNTY).............................................$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SANTA CRUZ COUNTY)..............$ 49.12 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA
CRUZ COUNTY)........................................$ 54.85 31.49 ---------------------------------------------------------------- CARP0605-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)............$ 51.47 33.08 CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)..$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (MONTEREY COUNTY)................$ 49.12 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(MONTEREY COUNTY)...................................$ 54.85 31.49 ---------------------------------------------------------------- CARP0701-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (FRESNO AND MADERA COUNTIES).$ 50.12 33.08 CARPENTERS: JOURNEYMAN CARPENTER (FRESNO AND MADERA
COUNTIES)...........................................$ 47.62 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (FRESNO AND MADERA COUNTIES)...$ 47.77 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(FRESNO AND MADERA COUNTIES)........................$ 54.85 31.49 ----------------------------------------------------------------

Page 496 of 576 ends

CARP0713-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY).............$ 54.95 33.08 CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)...$ 54.85 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (ALAMEDA COUNTY).................$ 55.00 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(ALAMEDA COUNTY)....................................$ 54.85 31.49 ---------------------------------------------------------------- CARP1109-001 07/01/2021
Rates Fringes
CARPENTERS: MILLWRIGHT (KINGS COUNTY)...............$ 50.12 33.08 CARPENTERS: JOURNEYMAN CARPENTER (KINGS COUNTY).....$ 47.62 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER

SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER KINGS COUNTY...................$ 47.77 31.49 CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (KINGS
COUNTY).............................................$ 54.85 31.49 ---------------------------------------------------------------- ELEC0006-004 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 67.65 31.78 SOUND & COMMUNICATIONS: INSTALLER SCOPE OF
WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY
FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION;

EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE

SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER
SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND

TESTINGS OF CONDUCTORS DETERMINED BY THEIR
FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED

IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND

WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING

PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;

EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE

VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'

ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.

Page 497 of 576 ends

FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN

RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON

PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL

BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR

THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.(SAN
FRANCISCO COUNTY)...................................$ 58.83 31.51 ---------------------------------------------------------------- ELEC0006-007 06/01/2024
Rates Fringes
ELECTRICIAN (SAN FRANCISCO COUNTY)..................$ 91.25 48.05 ---------------------------------------------------------------- ELEC0100-002 09/01/2025
Rates Fringes
ELECTRICIAN (FRESNO, KINGS, AND MADERA COUNTIES)....$ 50.00 30.15 ---------------------------------------------------------------- ELEC0100-005 12/01/2024
Rates Fringes
COMMUNICATIONS SYSTEM: TECHNICIAN (FRESNO, KINGS,

MADERA) SCOPE OF WORK INCLUDES THE

INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF

THE FOLLOWING SYSTEMS WHICH UTILIZE THE

TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND,

VISION AND DIGITAL FOR COMMERCIAL, EDUCATION,

SECURITY AND ENTERTAINMENT PURPOSES FOR THE
FOLLOWING: TV MONITORING AND SURVEILLANCE,

BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE

INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE

TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL

SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND,

BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK
SYSTEMS. A. SOUND AND VOICE

TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND

FOREGROUND MUSIC, INTERCOM AND TELEPHONE

INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL

SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND

SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE,

MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX

SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS,
RF SYSTEMS, ANTENNAS AND WAVE GUIDE, B. FIRE

ALARM SYSTEMS INSTALLATION, WIRE PULLING AND
TESTING C. TELEVISION AND VIDEO SYSTEMS

TELEVISION MONITORING AND SURVEILLANCE SYSTEMS

VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT

SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE
TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY

SYSTEMS PERIMETER SECURITY SYSTEMS VIBRATION SENSOR

SYSTEMS CARD ACCESS SYSTEMS ACCESS CONTROL SYSTEMS,
SONAR/INFRARED MONITORING EQUIPMENT E.

COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE

INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA
(SUPERVISORY CONTROL AND DATA ACQUISITION) PCM
(PULSE CODE MODULATION) INVENTORY CONTROL SYSTEMS,

DIGITAL DATA SYSTEMS BROADBAND AND BASEBAND AND

CARRIERS POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS

DATA COMMUNICATION SYSTEMS RF AND REMOTE CONTROL

SYSTEMS, FIBER OPTIC DATA SYSTEMS WORK EXCLUDED

RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING

LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED
SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10
FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS.

Page 498 of 576 ends

ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY

CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO
THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE

ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING

WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE

ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING
TWO (2) CONDITIONS APPLY: 1. THE PROJECT

INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES
CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN CONDUIT...............$ 52.07 28.21 COMMUNICATIONS SYSTEM: INSTALLER (FRESNO, KINGS,

MADERA) SCOPE OF WORK INCLUDES THE

INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF

THE FOLLOWING SYSTEMS WHICH UTILIZE THE

TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND,

VISION AND DIGITAL FOR COMMERCIAL, EDUCATION,

SECURITY AND ENTERTAINMENT PURPOSES FOR THE
FOLLOWING: TV MONITORING AND SURVEILLANCE,

BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE

INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE

TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL

SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND,

BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK
SYSTEMS. A. SOUND AND VOICE

TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND

FOREGROUND MUSIC, INTERCOM AND TELEPHONE

INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL

SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND

SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE,

MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX

SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS,
RF SYSTEMS, ANTENNAS AND WAVE GUIDE, B. FIRE

ALARM SYSTEMS INSTALLATION, WIRE PULLING AND
TESTING C. TELEVISION AND VIDEO SYSTEMS

TELEVISION MONITORING AND SURVEILLANCE SYSTEMS

VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT

SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE
TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY

SYSTEMS PERIMETER SECURITY SYSTEMS VIBRATION SENSOR

SYSTEMS CARD ACCESS SYSTEMS ACCESS CONTROL SYSTEMS,
SONAR/INFRARED MONITORING EQUIPMENT E.

COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE

INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA
(SUPERVISORY CONTROL AND DATA ACQUISITION) PCM
(PULSE CODE MODULATION) INVENTORY CONTROL SYSTEMS,

DIGITAL DATA SYSTEMS BROADBAND AND BASEBAND AND

CARRIERS POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS

DATA COMMUNICATION SYSTEMS RF AND REMOTE CONTROL

SYSTEMS, FIBER OPTIC DATA SYSTEMS WORK EXCLUDED

RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING

LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED
SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10
FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS.

ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY

CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO
THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE

ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING

WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE

ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING
TWO (2) CONDITIONS APPLY: 1. THE PROJECT

INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES
CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN CONDUIT...............$ 45.28 28.01 ----------------------------------------------------------------

Page 499 of 576 ends

ELEC0234-001 12/30/2025
Rates Fringes

ELECTRICIAN (MONTEREY, SAN BENITO AND SANTA CRUZ
COUNTIES) ZONE A : ALL OF SANTA CRUZ, MONTEREY,
AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF
HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN
AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101
SOUTH TO THE SAN LUIS OBISPO COUNTY LINE............$ 70.41 33.76

ELECTRICIAN (MONTEREY, SAN BENITO AND SANTA CRUZ
COUNTIES) ZONE B: ANY AREA OUTSIDE OF ZONE A.......$ 77.45 33.97 ---------------------------------------------------------------- ELEC0234-003 12/01/2021
Rates Fringes

SOUND & COMMUNICATIONS, TECHNICIAN (MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK:

INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL

OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY;

INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS
OF CONDUCTORS DETERMINED BY THEIR FUNCTION;

EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN

RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND

WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING

PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;

EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE

VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'

ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.

FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN

RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON

PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL

BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR

THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN........$ 55.12 24.30

SOUND & COMMUNICATIONS, INSTALLER (MONTEREY, SAN
BENITO, AND SANTA CRUZ COUNTIES)....................$ 47.93 24.09 ---------------------------------------------------------------- ELEC0302-001 03/01/2025
Rates Fringes
ELECTRICIAN (CONTRA COSTA COUNTY)...................$ 66.26 35.84 CABLE SPLICER (CONTRA COSTA COUNTY).................$ 74.54 36.09 ---------------------------------------------------------------- ELEC0302-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

Page 500 of 576 ends

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK

WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 61.04 31.08 SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK

WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 53.08 30.84 ---------------------------------------------------------------- ELEC0332-001 06/01/2025
Rates Fringes
ELECTRICIAN (SANTA CLARA COUNTY) FOOTNOTES: WORK

UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE

REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS,
""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE

WORKERS ARE NOT PROTECTED BY PERMANENT GUARD RAILS
AT A DISTANCE OF 40 TO 60 FT. FROM THE GROUND OR
SUPPORTING STRUCTURES: TO BE PAID ONE AND ONE-HALF
TIMES THE STRAIGHT-TIME RATE OF PAY. WORK ON
STRUCTURES OF 60 FT. OR OVER (AS DESCRIBED ABOVE):

TO BE PAID TWICE THE STRAIGHT-TIME RATE OF PAY......$ 91.03 49.05 CABLE SPLICER (SANTA CLARA COUNTY) FOOTNOTES:

WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE

REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS,
""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE

WORKERS ARE NOT PROTECTED BY PERMANENT GUARD RAILS
AT A DISTANCE OF 40 TO 60 FT. FROM THE GROUND OR
SUPPORTING STRUCTURES: TO BE PAID ONE AND ONE-HALF
TIMES THE STRAIGHT-TIME RATE OF PAY. WORK ON
STRUCTURES OF 60 FT. OR OVER (AS DESCRIBED ABOVE):

TO BE PAID TWICE THE STRAIGHT-TIME RATE OF PAY......$ 104.68 49.46 ---------------------------------------------------------------- ELEC0332-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR

Page 501 of 576 ends

RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK

WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 67.08 31.26 SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK

WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 58.33 31.00 ---------------------------------------------------------------- ELEC0595-001 06/01/2025
Rates Fringes
ELECTRICIAN (ALAMEDA COUNTY)........................$ 76.00 49.07 CABLE SPLICER (ALAMEDA COUNTY)......................$ 87.40 49.41 ---------------------------------------------------------------- ELEC0595-002 06/01/2024
Rates Fringes
ELECTRICIAN: (2) ALL OTHER WORK (CALAVERAS AND
SAN JOAQUIN COUNTIES)...............................$ 49.45 31.96 ELECTRICIAN: (1) TUNNEL WORK (CALAVERAS AND SAN
JOAQUIN COUNTIES)...................................$ 51.92 32.04 CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES)..$ 59.34 32.26 ---------------------------------------------------------------- ELEC0595-006 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER (ALAMEDA COUNTY)..$ 58.33 31.00

Page 502 of 576 ends

SOUND & COMMUNICATIONS, TECHNICIAN (ALAMEDA
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 67.08 31.26 ---------------------------------------------------------------- ELEC0595-008 12/01/2024
Rates Fringes
COMMUNICATIONS SYSTEM: TECHNICIAN (CALAVERAS AND
SAN JOAQUIN COUNTIES) SCOPE OF WORK: INCLUDING

ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT
OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK

WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 52.07 28.21 COMMUNICATIONS SYSTEM: INSTALLER (CALAVERAS AND
SAN JOAQUIN COUNTIES) SCOPE OF WORK: INCLUDING

ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT
OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

Page 503 of 576 ends

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK

WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 45.28 28.01 ---------------------------------------------------------------- ELEC0617-001 06/01/2025
Rates Fringes
ELECTRICIAN (SAN MATEO COUNTY)......................$ 86.00 51.07 ---------------------------------------------------------------- ELEC0617-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: TECHNICIAN (SAN MATEO
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 67.08 31.26 SOUND & COMMUNICATIONS: INSTALLER (SAN MATEO
COUNTY) SCOPE OF WORK: INCLUDING ANY DATA

SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR
RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA

SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL
FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION

OF TERMINATIONS AND TESTINGS OF CONDUCTORS
DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR

REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED
IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY

SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK,

LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS
LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL
HAVING BUILDING ACCESS); EXCLUDING ENERGY
MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM

WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND

CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR

MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE

Page 504 of 576 ends

CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED

IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE
ELECTRICIAN.........................................$ 58.33 31.00 ---------------------------------------------------------------- ELEC0684-001 12/01/2024
Rates Fringes

ELECTRICIAN (MARIPOSA, MERCED, STANISLAUS AND
TUOLUMNE COUNTIES) CABLE SPLICER = 110% OF
JOURNEYMAN ELECTRICIAN..............................$ 48.50 30.09 ---------------------------------------------------------------- ELEC0684-004 12/01/2024
Rates Fringes
COMMUNICATIONS SYSTEM: TECHNICIAN (MARIPOSA,

MERCED, STANISLAUS AND TUOLUMNE COUNTIES) SCOPE
OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY
FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION;

EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE

SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER
SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND

TESTINGS OF CONDUCTORS DETERMINED BY THEIR
FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED

IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND

WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING

PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;

EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE

VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'

ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.

FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN

RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON

PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL

BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR

THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN........$ 52.07 28.21 COMMUNICATIONS SYSTEM: INSTALLER (MARIPOSA,

MERCED, STANISLAUS AND TUOLUMNE COUNTIES) SCOPE
OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY
FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION;

EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE

SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER
SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND

TESTINGS OF CONDUCTORS DETERMINED BY THEIR
FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED

IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND

WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING

PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;

EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE

VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'

ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.

FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN

RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON

PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL

BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR

THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN........$ 45.28 28.01 ---------------------------------------------------------------- ELEC1245-001 01/01/2025

Page 505 of 576 ends

Rates Fringes
LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,

THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY.......................................$ 40.76 21.76 LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST
(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND

BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE
EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

VETERANS DAY, THANKSGIVING DAY AND DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 53.30 22.26 LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER
HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,

THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY.......................................$ 70.16 24.71 ---------------------------------------------------------------- ELEV0008-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION:

EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5
YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF
SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER
THANKSGIVING, AND CHRISTMAS DAY.....................$ 84.05 38.44 ---------------------------------------------------------------- ENGI0003-001 06/29/2020
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 6.............................................$ 42.50 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 5.............................................$ 44.73 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 4.............................................$ 47.37 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 3 (Truck Crane Oiler).........................$ 45.12 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 3 (Oiler).....................................$ 42.89 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 3 (Lifting devices)...........................$ 49.14 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 2 (Truck Crane Oiler).........................$ 45.41 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 2 (Oiler).....................................$ 43.11 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 2 (Lifting devices)...........................$ 50.82 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 1 (Truck Crane Oiler).........................$ 45.66 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 1 (Oiler).....................................$ 43.38 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 1 (Lifting devices)...........................$ 52.64 31.15 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 5)..............$ 58.09 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 4)..............$ 59.23 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 3)..............$ 60.37 32.53

Page 506 of 576 ends

OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 2)..............$ 61.70 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)............$ 65.43 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1)..............$ 62.96 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)...$ 58.19 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)...$ 59.33 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)...$ 60.47 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)...$ 61.80 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)...$ 63.06 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 5.........................................$ 62.24 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 4.........................................$ 63.54 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 3.........................................$ 65.56 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 2.........................................$ 67.04 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 1.........................................$ 68.81 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 4..................................$ 61.30 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 3 (Hydraulic)......................$ 59.98 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 3 (Cranes).........................$ 64.34 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 2..................................$ 66.08 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 1..................................$ 68.59 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A......$ 55.49 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8........$ 57.70 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7........$ 58.84 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6........$ 59.98 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5........$ 61.30 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4........$ 62.57 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3........$ 63.95 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2........$ 65.43 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1........$ 66.96 32.53 ---------------------------------------------------------------- ENGI0003-001 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 6.............................................$ 42.50 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 5.............................................$ 44.73 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 4.............................................$ 47.37 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 3 (Truck Crane Oiler).........................$ 45.12 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 3 (Oiler).....................................$ 42.89 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 3 (Lifting devices)...........................$ 49.14 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 2 (Truck Crane Oiler).........................$ 45.41 31.15

Page 507 of 576 ends

OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 2 (Oiler).....................................$ 43.11 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 2 (Lifting devices)...........................$ 50.82 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 1 (Truck Crane Oiler).........................$ 45.66 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 1 (Oiler).....................................$ 43.38 31.15 OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::

GROUP 1 (Lifting devices)...........................$ 52.64 31.15 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 5)..............$ 58.09 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 4)..............$ 59.23 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 3)..............$ 60.37 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 2)..............$ 61.70 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)............$ 65.43 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1)..............$ 62.96 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)...$ 58.19 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)...$ 59.33 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)...$ 60.47 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)...$ 61.80 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)...$ 63.06 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 5.........................................$ 62.24 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 4.........................................$ 63.54 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 3.........................................$ 65.56 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 2.........................................$ 67.04 32.53 OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 1.........................................$ 68.81 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 4..................................$ 61.30 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 3 (Hydraulic)......................$ 59.98 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 3 (Cranes).........................$ 64.34 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 2..................................$ 66.08 32.53 OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:: GROUP 1..................................$ 68.59 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A......$ 55.49 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8........$ 57.70 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7........$ 58.84 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6........$ 59.98 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5........$ 61.30 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4........$ 62.57 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3........$ 63.95 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2........$ 65.43 32.53 OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1........$ 66.96 32.53 ----------------------------------------------------------------

Page 508 of 576 ends

ENGI0003-008 08/01/2024
Rates Fringes
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (4) BARGEMAN; DECKHAND;
FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,

MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN

FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,

SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:

NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:

REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE

SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:

REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:

AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:

WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:

AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL

BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART........................................$ 53.23 39.55 DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (3) BOOSTER PUMP
OPERATOR; DECK ENGINEER; DECK MATE; DREDGE
TENDER; WINCH OPERATOR AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,

MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN

FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,

SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:

NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:

REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE

SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA

Page 509 of 576 ends

COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:

REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:

AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:

WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:

AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL

BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART........................................$ 56.53 39.55 DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (2) DREDGE DOZER; HEAVY
DUTY REPAIRMAN : AREA DESCRIPTIONS AREA 1:

ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN

JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,

SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY THE REMAINGING COUNTIES
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:

ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA
2: REMAINDER CALAVERAS COUNTY: AREA 1:

REMAINDER AREA 2: EASTERN PART COLUSA COUNTY:

AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO
COUNTY: AREA 1: NORTH CENTRAL PART AREA 2:

REMAINDER FRESNO COUNTY: AREA 1: REMAINDER
AREA 2: EASTERN PART GLENN COUNTY: AREA 1:

EASTERN PART AREA 2: REMAINDER LASSEN COUNTY:

AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA
2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MONTERREY
COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2:

SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL

BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA
COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1:

AL BUT THE CENTRAL PORTION AREA 2: REMAINDER
PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2:

REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:

REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:

REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 57.65 39.55 DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (1) LEVERMAN AREA
DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA

COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN

BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,

Page 510 of 576 ends

SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC

COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN
AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY:

AREA 1: NORTHERNMOST PART AREA 2: REMAINDER
CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2:

EASTERN PART COLUSA COUNTY: AREA 1: EASTERN
PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1:

NORTH CENTRAL PART AREA 2: REMAINDER FRESNO
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
GLENN COUNTY: AREA 1: EASTERN PART AREA 2:

REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART

ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA
COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA
1: EXCEPT EASTERN PART AREA 2: EASTERN PART
MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART
AREA 2: EASTERN PART MONTERREY COUNTY AREA 1:

EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN
PART NEVADA COUNTY: AREA 1: ALL BUT THE

NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY
AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS
COUNTY: AREA 1: WESTERN PORTION AREA 2:

REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:

REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:

REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 62.61 39.55 DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (4) BARGEMAN; DECKHAND;
FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,

MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN

FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,

SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:

NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:

REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE

SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:

REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:

AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN

Page 511 of 576 ends

CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:

WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:

AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL

BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART........................................$ 51.23 39.55 DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (3) BOOSTER PUMP
OPERATOR; DECK ENGINEER; DECK MATE; DREDGE
TENDER; WINCH OPERATOR AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,

MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN

FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,

SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:

NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:

REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE

SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:

REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:

AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:

WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:

AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL

BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:

EASTERN PART........................................$ 54.53 39.55 DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (1) LEVERMAN AREA
DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA

COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN

BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,

SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC

COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN
AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY:

AREA 1: NORTHERNMOST PART AREA 2: REMAINDER
CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2:

EASTERN PART COLUSA COUNTY: AREA 1: EASTERN

Page 512 of 576 ends

PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1:

NORTH CENTRAL PART AREA 2: REMAINDER FRESNO
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
GLENN COUNTY: AREA 1: EASTERN PART AREA 2:

REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART

ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA
COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA
1: EXCEPT EASTERN PART AREA 2: EASTERN PART
MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART
AREA 2: EASTERN PART MONTERREY COUNTY AREA 1:

EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN
PART NEVADA COUNTY: AREA 1: ALL BUT THE

NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY
AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS
COUNTY: AREA 1: WESTERN PORTION AREA 2:

REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:

REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:

REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 60.61 39.55 DREDGING ( CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (2) DREDGE DOZER; HEAVY
DUTY REPAIRMAN AREA DESCRIPTIONS AREA 1:

ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN

JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,

SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY THE REMAINGING COUNTIES
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:

ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA
2: REMAINDER CALAVERAS COUNTY: AREA 1:

REMAINDER AREA 2: EASTERN PART COLUSA COUNTY:

AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO
COUNTY: AREA 1: NORTH CENTRAL PART AREA 2:

REMAINDER FRESNO COUNTY: AREA 1: REMAINDER
AREA 2: EASTERN PART GLENN COUNTY: AREA 1:

EASTERN PART AREA 2: REMAINDER LASSEN COUNTY:

AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA
2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MONTERREY
COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2:

SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL

BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA
COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1:

AL BUT THE CENTRAL PORTION AREA 2: REMAINDER
PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2:

REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:

REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE

Page 513 of 576 ends

NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:

REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 55.65 39.55 ---------------------------------------------------------------- ENGI0003-019 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:

GROUP 3 (AREA 2)....................................$ 49.64 28.56 OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:

GROUP 3 (AREA 1)....................................$ 47.64 28.56 OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:

GROUP 2 (AREA 2)....................................$ 54.25 28.56 OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:

GROUP 2 (AREA 1)....................................$ 52.25 28.56 OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:

GROUP 1 (AREA 2)....................................$ 57.85 28.56 OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:

GROUP 1 (AREA 1)....................................$ 55.85 28.56 ---------------------------------------------------------------- IRON0377-001 01/01/2025
Rates Fringes
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL
(ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA
COUNTIES)...........................................$ 55.33 35.15 IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA,
SAN MATEO, SANTA CLARA COUNTIES)....................$ 45.78 26.51 ---------------------------------------------------------------- IRON0377-003 01/01/2025
Rates Fringes
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL
(SAN FRANCISCO CITY AND COUNTY).....................$ 55.83 35.15 IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND
COUNTY).............................................$ 45.78 26.51 ---------------------------------------------------------------- IRON0433-005 01/01/2025
Rates Fringes
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL
(REMAINING COUNTIES)................................$ 50.70 35.15 IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES)......$ 45.78 26.51 ---------------------------------------------------------------- LABO0067-006 06/30/2025
Rates Fringes
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2.........$ 38.15 30.03 LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1.........$ 39.15 30.03 ---------------------------------------------------------------- LABO0073-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC

CONTROL PERSON II INSTALLATION AND REMOVAL OF

TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 34.06 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC

CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(CALAVERAS AND SAN JOAQUIN COUNTIES)................$ 36.56 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT

DRIVER, FLAG PERSON (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 36.26 27.30

Page 514 of 576 ends

---------------------------------------------------------------- LABO0073-003 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY)....$ 36.29 25.55 ---------------------------------------------------------------- LABO0073-005 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.....$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN.......................$ 44.42 27.72 TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD).....................$ 44.96 27.72 TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,

INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT

ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE............................$ 45.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT

WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL)..............................................$ 45.66 27.72 TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER;
GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN...........$ 45.89 27.72 ---------------------------------------------------------------- LABO0073-007 06/30/2025
Rates Fringes
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS (CALAVERAS AND SAN JOAQUIN COUNTIES)- (2)
Establishment Warranty Period.......................$ 31.59 29.89 LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS (CALAVERAS AND SAN JOAQUIN COUNTIES)- (1)
New Construction....................................$ 37.90 29.89 LABORER, WRECKING: GROUP 2 Semi-skilled wrecker
(salvaging of other building materials) (CALAVERAS
AND SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS

WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW..................................$ 38.00 29.89 LABORER, WRECKING: GROUP 1 (CALAVERAS AND SAN
JOAQUIN COUNTIES)...................................$ 38.15 29.89 LABORER, GUNITE: GROUP 4 GUINTE LABORER
(CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW...................$ 37.90 29.89 LABORER, GUNITE: GROUP 3 REBOUNDMAN (CALAVERAS AND
SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING

Page 515 of 576 ends

SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW..................................$ 38.02 29.89 LABORER, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN,

GROUNDMAN (CALAVERAS AND SAN JOAQUIN COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW..$ 38.61 29.89 LABORER, GUNITE: GROUP 1 (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 39.11 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4 FINAL

CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).

THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A:

AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.

B: AT THE CONCLUSION OF A JOB WHERE THE

MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED
ON ANOTHER JOB. C: FOR THE CLEANING OF

SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER

CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(CALAVERAS AND SAN JOAQUIN COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 31.59 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3

CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE

ONLY) (CALAVERAS AND SAN JOAQUIN COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE

Page 516 of 576 ends

RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 37.90 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.

PRESSURE); LOADING AND UNLOADING, CARRYING AND

HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL

PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12

INCHES (CALAVERAS AND SAN JOAQUIN COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 38.00 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E

WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN

THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT

THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD

APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY

WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. (CALAVERAS AND SAN JOAQUIN

Page 517 of 576 ends

COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR

WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 38.70 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C

BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE

WELDING (CALAVERAS AND SAN JOAQUIN COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 38.20 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY
DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND
SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;

MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL

WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER

AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;

BIT GRINDER (CALAVERAS AND SAN JOAQUIN COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

Page 518 of 576 ends

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 38.37 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,

BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER

APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC

AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);

LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;

PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP

STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF

SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);

ASBESTOS AND MOLD REMOVAL WORKER (CALAVERAS AND
SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS

WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER

Page 519 of 576 ends

MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 38.15 29.89 LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
(CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO

HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE

RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 38.85 29.89 LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-f
CALAVERAS AND SAN JOAQUIN COUNTIES..................$ 30.37 29.89 ---------------------------------------------------------------- LABO0073-009 07/01/2023
Rates Fringes

LABORER, PLASTER TENDER (CALAVERAS AND SAN JOAQUIN
COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00
PER HOUR ADDITIONAL.................................$ 39.77 28.54 ---------------------------------------------------------------- LABO0261-003 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC

CONTROL PERSON II INSTALLATION AND REMOVAL OF

TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (SAN FRANCISCO AND SAN MATEO
COUNTIES)...........................................$ 35.06 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC

CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 37.56 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT

DRIVER, FLAG PERSON (SAN FRANCISCO AND SAN MATEO
COUNTIES)...........................................$ 37.26 27.30 ----------------------------------------------------------------

Page 520 of 576 ends

LABO0261-005 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (SAN FRANCISCO AND
SAN MATEO COUNTIES).................................$ 44.42 27.72 TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND

SPREADING, DUMPMEN (ANY METHOD) (SAN FRANCISCO AND
SAN MATEO COUNTIES).................................$ 44.96 27.72 TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,

INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT

ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;

POWDERMAN - PRIMER HOUSE (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 45.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT

WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 45.66 27.72 TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER;
GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (SAN
FRANCISCO AND SAN MATEO COUNTIES)...................$ 45.89 27.72 ---------------------------------------------------------------- LABO0261-009 06/26/2023
Rates Fringes
LABORERS:, GUNITE - AREA A:: GROUP 1 (SAN
FRANCISCO, AND SAN MATEO COUNTIES)..................$ 37.46 27.30 LABORERS:, GUNITE - AREA A: GROUP 4 GUNITE LABORER
(SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW..$ 36.25 27.30 LABORERS:, GUNITE - AREA A: GROUP 3 REBOUNDMAN (SAN
FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW...................$ 36.37 27.30 LABORERS:, GUNITE - AREA A: GROUP 2 NOZZLEMAN,

GUNMAN, POTMAN, GROUNDMAN (SAN FRANCISCO, AND SAN
MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF

OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. ..............................$ 36.96 27.30 LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A: (SAN FRANCISCO, AND SAN MATEO
COUNTIES)- (2) Establishment Warranty Period........$ 29.94 27.30

Page 521 of 576 ends

LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A: (SAN FRANCISCO, AND SAN MATEO
COUNTIES)- (1) New Construction.....................$ 36.25 27.30 LABORER, WRECKING - AREA A:: GROUP 1 (SAN
FRANCISCO, AND SAN MATEO COUNTIES)..................$ 36.50 27.30 LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled
wrecker (salvaging of other building materials)
(SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW...................$ 36.35 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND
BUILDING INCLUDING BUT NOT LIMITED TO: STREET
CLEANER; CLEANING AND WASHING WINDOWS; BRICK
CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE
ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO
BE UTILIZED UNDER THE FOLLOWING CONDITIONS:

A: AT DEMOLITION SITE FOR THE SALVAGE OF THE
MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE

THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE
REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF

SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER

CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH

OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. THIS SHALL NOT APPLY TO WORKERS

ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A BELOW. SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR

COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,

LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE

THEIR REGULAR RATE FOR ALL WORK PERFORMED ON

UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT

SHALL APPLY TO CUT AND COVER WORK OF SUBWAY

CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED..............................................$ 29.94 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND
GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON;
FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE

ONLY) (SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL

Page 522 of 576 ends

RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY
ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS

ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 36.25 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING

AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL

PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12

INCHES (SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY
ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS

ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 36.35 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN
DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS

UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE

RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND

EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE

Page 523 of 576 ends

FOOTING FROM THE DATE OF INCEPTION. (SAN
FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO

HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE

RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25

PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK

PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 37.05 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-C BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND

SIMILAR TYPE WELDING (SAN FRANCISCO, AND SAN
MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF

OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 36.55 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL

DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL

WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER

AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;

BIT GRINDER (SAN FRANCISCO, AND SAN MATEO
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR

WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH

Page 524 of 576 ends

IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 36.72 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO,
WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE;

CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,
PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER

APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC

AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);

LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;

PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP

STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF

SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);

ASBESTOS AND MOLD REMOVAL WORKER SAN FRANCISCO,
AND SAN MATEO COUNTIES FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR

COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER

Page 525 of 576 ends

SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,

LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE

THEIR REGULAR RATE FOR ALL WORK PERFORMED ON

UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT

SHALL APPLY TO CUT AND COVER WORK OF SUBWAY

CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. .....................................$ 36.50 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND
RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH
LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;
PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR
TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
(SAN FRANCISCO, AND SAN MATEO COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER
DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER""

MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE

WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER

SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL
RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 37.20 27.30 ---------------------------------------------------------------- LABO0261-011 07/01/2023
Rates Fringes

MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO
COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS

SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES,
TELEPHONE CONDUITS, TUNNELS AND CUT TRENCHES: $5.00
PER DAY ADDITIONAL. WORK IN LIVE SEWAGE: $2.50 PER
DAY ADDITIONAL......................................$ 37.05 27.45 ---------------------------------------------------------------- LABO0261-014 07/01/2023
Rates Fringes

PLASTER TENDER (SAN FRANCISCO AND SAN MATEO
COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00
PER HOUR ADDITIONAL.................................$ 41.93 30.32 ---------------------------------------------------------------- LABO0270-003 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II (Area B)..........................$ 34.06 27.30

Page 526 of 576 ends

LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II (Area A)..........................$ 35.06 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I (Area B)...........................$ 36.56 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I (Area A)...........................$ 37.56 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (Area B)........................$ 36.26 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (Area A)........................$ 37.26 27.30 ---------------------------------------------------------------- LABO0270-004 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
(MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ
COUNTIES)...........................................$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (MONTEREY, SAN
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 44.42 27.72 TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND

SPREADING, DUMPMEN (ANY METHOD) (MONTEREY, SAN
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 44.96 27.72 TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,

INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT

ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;

POWDERMAN - PRIMER HOUSE (MONTEREY, SAN BENITO,
SANTA CLARA, AND SANTA CRUZ COUNTIES)...............$ 45.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT

WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND

LEVEL) (MONTEREY, SAN BENITO, SANTA CLARA, AND
SANTA CRUZ COUNTIES)................................$ 45.66 27.72 TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
(MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ
COUNTIES)...........................................$ 45.89 27.72 ---------------------------------------------------------------- LABO0270-005 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN
BENITO COUNTIES)....................................$ 36.29 25.55 ---------------------------------------------------------------- LABO0270-007 06/26/2023
Rates Fringes
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE

LABORERS - AREA B (MONTEREY, SAN BENITO AND SANTA
CRUZ COUNTIES)- (2) Establishment Warranty Period...$ 28.94 27.30 LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE

LABORERS - AREA B (MONTEREY, SAN BENITO AND SANTA
CRUZ COUNTIES)- (1) New Construction................$ 35.25 27.30 LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled

Page 527 of 576 ends

wrecker (salvaging of other building materials)
(MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW..$ 35.35 27.30 LABORER, WRECKING - AREA B: GROUP 1 (MONTEREY, SAN
BENITO AND SANTA CRUZ COUNTIES).....................$ 35.50 27.30 LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER
(MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW..$ 35.25 27.30 LABORER, GUNITE - AREA B: GROUP 3REBOUNDMAN
(MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW..$ 35.37 27.30 LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN,

GUNMAN, POTMAN, GROUNDMAN (MONTEREY, SAN BENITO AND
SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW..................................$ 35.96 27.30 LABORER, GUNITE - AREA B: GROUP 1 (MONTEREY, SAN
BENITO AND SANTA CRUZ COUNTIES).....................$ 36.46 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 4 (MONTEREY, SAN BENITO AND SANTA CRUZ

COUNTIES) FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS
AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET
CLEANER; CLEANING AND WASHING WINDOWS; BRICK
CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE
ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO
BE UTILIZED UNDER THE FOLLOWING CONDITIONS:

A: AT DEMOLITION SITE FOR THE SALVAGE OF THE
MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE

THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE
REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF

SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER

CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(MONTEREY, SAN BENITO AND SANTA CRUZ
COUNTIES) FOOTNOTES: LABORERS WORKING OFF

OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED

Page 528 of 576 ends

HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 28.94 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE
AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG
PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL
ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE
LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER;
PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE,
REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD
CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER
LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT
(JOBSITE ONLY) (MONTEREY, SAN BENITO AND SANTA
CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR

WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 35.25 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING

AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL

PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12

INCHES (MONTEREY, SAN BENITO AND SANTA CRUZ
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR

WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

Page 529 of 576 ends

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 35.35 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH

GUNITING OR SHOT CRETE (MONTEREY, SAN BENITO AND
SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 36.08 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN
DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS

UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE

RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND

EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE
FOOTING FROM THE DATE OF INCEPTION. (MONTEREY, SAN
BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO

HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE

RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25

PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK

PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

Page 530 of 576 ends

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 36.05 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 1-C BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND

SIMILAR TYPE WELDING (MONTEREY, SAN BENITO AND
SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 35.55 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL

DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL

WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER

AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;

BIT GRINDER (MONTEREY, SAN BENITO AND SANTA CRUZ
COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR

WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 35.72 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

GROUP 1- LABORER CLASSIFICATIONS CONSTRUCTION
SPECIALIST GROUP: ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE

Page 531 of 576 ends

PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.

GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO,
WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE;

CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,
PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER

APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC

AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);

LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;

PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP

STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF

SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);

ASBESTOS AND MOLD REMOVAL WORKER (MONTEREY, SAN
BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO

HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE

RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25

PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK

PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. ...........$ 35.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS - AREA B:

Page 532 of 576 ends

CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND
RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH
LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;
PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR
TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY
ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS

ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 36.20 27.30 ---------------------------------------------------------------- LABO0270-010 06/26/2023
Rates Fringes
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A: (SANTA CLARA COUNTY)- (2)
Establishment Warranty Period.......................$ 29.94 27.30 LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A: (SANTA CLARA COUNTY)- (1) New
Construction........................................$ 36.25 27.30 LABORER, WRECKING - AREA A:: GROUP 2 Semi-skilled
wrecker (salvaging of other building materials)
(SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW..................................$ 36.35 27.30 LABORER, WRECKING - AREA A:: GROUP 1 (SANTA CLARA
COUNTY).............................................$ 36.50 27.30 LABORER, GUNITE - AREA A:: GROUP 1 (SANTA CLARA
COUNTY).............................................$ 37.46 27.30 LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER
(SANTA CLARA COUNTY) FOOTNOTES: LABORERS

WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW..................................$ 36.25 27.30 LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN
(SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING

OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW..................................$ 36.37 27.30 LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN,

Page 533 of 576 ends

GUNMAN, POTMAN, GROUNDMAN (SANTA CLARA COUNTY)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW..$ 36.96 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A::

GROUP 1 (SANTA CLARA COUNTY)........................$ 36.50 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND
BUILDING INCLUDING BUT NOT LIMITED TO: STREET
CLEANER; CLEANING AND WASHING WINDOWS; BRICK
CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE
ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO
BE UTILIZED UNDER THE FOLLOWING CONDITIONS:

A: AT DEMOLITION SITE FOR THE SALVAGE OF THE
MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE

THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE
REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF

SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY
JOBSITE YARD. THE MATERIAL CLEANER

CLASSIFICATION SHOULD NOT BE USED IN THE
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND
OILING AND MOVING TO THE NEXT POINT OF ERECTION"".
(SANTA CLARA COUNTY) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO

HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE

RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25

PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK

PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 29.94 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND
GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON;
FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY) (SANTA CLARA COUNTY) FOOTNOTES: LABORERS

WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

Page 534 of 576 ends

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 36.25 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER,
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING

AND HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL

PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES (SANTA CLARA COUNTY) FOOTNOTES: LABORERS

WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 36.35 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH

GUNITING OR SHOT CRETE (SANTA CLARA COUNTY)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL

Page 535 of 576 ends

RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 37.08 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN
DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS

UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE

RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND

EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE
FOOTING FROM THE DATE OF INCEPTION. (SANTA CLARA
COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH

OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. THIS SHALL NOT APPLY TO WORKERS

ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN
GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS

PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK
BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO

CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE
TEMPORARY COVER HAS BEEN PLACED.....................$ 37.05 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-C BURNING AND WELDING IN CONNECTION WITH
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND

SIMILAR TYPE WELDING (SANTA CLARA COUNTY)
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM

BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW.

SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY

WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK

INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND

ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.

MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL

EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR

ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 36.55 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER

Page 536 of 576 ends

MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER;
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL

DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL

WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER

AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER (SANTA CLARA COUNTY) FOOTNOTES:

LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL

NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE
RATE SET FORTH IN GROUP 1-A BELOW. SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO

HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE

RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE
AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25

PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK

PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL

NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER

WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED...............................$ 36.72 27.30 LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:

CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND
RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH
LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;
PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR
TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL
(SANTA CLARA COUNTY) FOOTNOTES: LABORERS

WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO

WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH
IN GROUP 1-A BELOW SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.

THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE

DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. MAINTENANCE AND REPAIR TRACK AND
ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR

REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND
STRUCTURES NOT SPECIFICALLY COVERED.................$ 37.20 27.30 ---------------------------------------------------------------- LABO0270-011 07/01/2023
Rates Fringes

LABORER, PLASTER TENDER (MONTEREY, SAN BENITO,

SANTA CRUZ, SANTA CLARA COUNTIES) WORK ON A SWING
STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL...........$ 40.68 29.68 ---------------------------------------------------------------- LABO0294-001 07/01/2023

Page 537 of 576 ends