Cities Index.
3/1/22 Sup Com - Slama PPT

City Council/Public Financing Authority
March 1, 2022

Document
3/1/22 Sup Com - Slama PPT
Meeting
March 1, 2022
Body
City Council/Public Financing Authority
Original file
1.4 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

3/1/2022
Edison Park Parks Huntington Beach
Conceptual Plan Lifer!
Bet City Council Meeting

HUNTINGTON BEACH
March 1, 2022
Item 22-123
Conceptual Master
Planning based on
Community Input
MAY through
NOVEMBER 2021

PROJECT PURPOSE
• Edison Park, located at 21377 Magnolia Avenue, was constructed in the early 1970s, and is in need of refurbishment.
• In 2009, a Master Plan for Edison Park was approved, involving a complete reconfiguration of the park.
• The approved Fiscal Year 2021/22 CIP program includes funding to develop an updated conceptual plan to reconfigure Edison Park, in order to address changing recreation trends.
• In May 2021, staff engaged RJM Design Group to facilitate community input that would be used to develop a conceptual plan to guide current and future park and recreation development.

SUPPLEMENTAL

COMMUNICATION
Meeting Date: 3/1/22
1 Agenda item No.: 22(22-123)
3/1/2022

COMMUNITY OUTREACH SUMMARY
• Launched Project Website
bit.ly/hbedisonpark
• Website views: 4,034
• City Website, City Facebook / Social Media Edison Park Conceptual Plan put loare (oetta
KOCl Falun basC onta Colanuy BEas
• City Council Meetings
Edison Park
• City Manager Newsletter Conceptual Plan
• Various Community Groups Informed
62 133 1
• Community & Library Services Commission
Edison Park
(Meeting Notices Mailed to residents and Conceptual Plan businesses within 1,000 ft. radius / local
newspapers)
• Postings at Community Center / Park
• Registration Software E-mail Blasts

COMMUNITY OUTREACH SUMMARY
• Survey 1 - 160 Participants
• Survey 2 - 295 Participants
• Community Workshop - 10 Participants
• Community Design Charrette - 45 Participants
• Feedback Survey - 90 Participants
• Feedback Comments - 23 Participants
623 Total Participants
2 3/1/2022

CURRENT CONFIGURATION
(RESIDENTIAL
STILWEL DR City Property
i School District Property
SCE Property

EDISON PARK
FIELD 2 COMMUNIA
CERVER Landfill Limits

SURE EDISON
FIELD

STATION A

HAMILTON AVE
EDISON PARK CONCEPTUAL PLAN - NOVEMBER 10, 2021

EDISON PARK CONCEPTUAL PLAN LEGENO

1. Kecont qured parking lot with new enby of Edson HS In November 2021,

2. Expanded parking lot with drop off and new entry of STILWELL DR 02 the Community &

3. New sport court plota with seating and shade

5. Newhol Com botalbol cout d Library Services
New tanni courte 121

7. New practice hitting wall (2). Commission

8. New picnic tables

9. New enclosed dog area with woler, sealing and shatte

10. Balin tems courts 13 ond isconvered fo
unanimously

11. Reconfoured wolkways.

12. Eating trees. approved to

15. Existing softool felds recommend the

16. few U10:30 yos x/0 yus soccer told overlay with ful

17. New exercise slotions on decomposed granile. Conceptual Plan to

9. New U1O (50 ydsx 70 yds) soccer feld overlay in SCE
MAGNOLIA ST City Council.

22. New tot lot wih rubbar surfacing, equipment and

45. New work reinons ond concatonssiand

27. Ductuse courts (2 tenna with 8 picilebol).
3 3/1/2022

ADDITIONAL FEEDBACK
Following the concept approval by
Commission, AYSO expressed the need for
additional lighted practice space.

However, neighboring residents also LEE
articulated the following feedback:

1. 57-space parking lot addition would
intensify use of the park, and eliminate
mature trees.

2. Sports courts would result in removal of
mature trees.

3. Soccer field overlay on softball fields would HAMILTON AVE eliminate mature trees.

CONCEPTUAL PLAN - OPTION C
• To address these

1. keconoves poewlol wihren eny o toson Hs
concerns, staff and RJM
port cout piasa wih seatrg and node
00 goo0
developed two net court bente ool cout (4).
additional Conceptual
Plans for City Council
consideration. New thode steter 0,00
wuihaso chocomo dond
• On November 16, 2021,
City Council
22 tiew iot b wih ntber swfocrg equoment an
unanimously approved 23. Exponded exferior res tooers of Cormunity Cent

24. Biltro SCE Tawen and oveteod ully Ina
Option C as the Edison 2. aar coste oot pic eboo
Park Reconfiguration
Conceptual Plan.
00 0.

HAMAION AVE
3/1/2022

CURRENT SITUATION
• Since the approval of Option C, staff has undertaken preliminary analysis and further public outreach.
• Based on the feedback received, staff believes the previously approved Conceptual Plan warrants further reconsideration, which could lead to design modifications and greater community consensus.

RECOMMENDED ACTIONS
• Withdraw the November 16, 2021 City Council approval of the final Edison Park Reconfiguration Conceptual Plan; and,
• Direct staff to conduct further community outreach and additional review and analysis of the Conceptual Plan, and return to City Council with updated recommendations.
& NUMINGTON
10 5
3/1/2022

NEXT STEPS
Site Analysis: Detailed topographical aerial survey and certified arborist report.
• Additional Outreach: Community meetings to review site analysis findings and gather additional resident feedback for consideration.
• Return to City Council within 90 - 120 days to provide updated information and potential design modifications. 11 Edison Park *Parks
Conceptual Plan setfer e

HUNTINGTON BEACH
QUESTIONS?
Conceptual Master
Planning based on
Community Input OR HUNTINGTON
MAY through
NOVEMBER 2021

GE COUN
12 6

← All documents from this meeting